Powered by Deep Web Technologies
Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Mixing Fast Trains on Freight Rail Corridors presented by  

E-Print Network [OSTI]

Mixing Fast Trains on Freight Rail Corridors presented by: Minnesota Department of Transportation May 23, 2012 #12;Presentation Outline 路 State Plans for Fast (Passenger) Trains 路 Overarching) Suggest picture of CP grain train be inserted here #12;Passenger Rail Development Overarching Principles

Minnesota, University of

2

Intercity passenger rail productivity in the Northeast Corridor : implications for the future of high-speed Rail  

E-Print Network [OSTI]

The ongoing discussion about the future implementation of high-speed rail (HSR) in the Northeast Corridor (NEC) is full of questions on the feasibility of HSR and the ability of Amtrak to implement it. Indeed, the introduction ...

Archila T閘lez, Andr閟 Felipe

2013-01-01T23:59:59.000Z

3

Air, High Speed Rail, or Highway: A Cost Comparison in the California Corridor  

E-Print Network [OSTI]

these reduced social costs offset rail's high capital and operating costs. The development of cost estimates, any of these three modes. In this study we include estimates of four types of external, social costs design characteristics observed in the California corridor. We estimate rail costs with models adapted

Levinson, David M.

4

EIS-0250-S2: Supplemental EIS for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada- Nevada Rail Transportation Corridor  

Broader source: Energy.gov [DOE]

This SEIS is to evaluate the potential environmental impacts of constructing and operating a railroad for shipments of spent nuclear fuel and high-level radioactive waste from an existing rail line in Nevada to a geologic repository at Yucca Mountain. The purpose of the evaluation is to assist the Department in deciding whether to construct and operate a railroad in Nevada, and if so, in which corridor and along which specific alignment within the selected corridor.

5

Central Corridor Light Rail Transit Briefing for Campus Connections  

E-Print Network [OSTI]

impacts in comments to Draft Environmental Impact Statement 路 Fall/Winter 2007-2008: Met Council enters Impact (EMI) Goals 路 Preserve the existing environmental quality of the labs 颅 DO NO HARM 路 Const Corridor should realize development opportunities while reducing impact to the urban environment

Thomas, David D.

6

ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA  

SciTech Connect (OSTI)

The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

DOE

2005-12-01T23:59:59.000Z

7

The Alameda Corridor: Lessons Learned  

E-Print Network [OSTI]

The Alameda Corridor: Lessons Learned Plus Past and Future Challenges Presented to: Portland State Corridor **Trucked around Corridor but leaves or enters Southern California by rail. #12;Lessons Learned

Bertini, Robert L.

8

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor  

E-Print Network [OSTI]

Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line for commuter rail service. In addition the Grand Junction ...

Bockelie, Adam

2012-01-01T23:59:59.000Z

9

Assessment of the potential diversion of air passengers to high-speed rail in the northeast corridor  

E-Print Network [OSTI]

The high level of intercity passenger travel in the Northeast Corridor is supported by densely populated metropolitan city-centers, the suitable distance between the urban areas, and the extent to which economic and social ...

Clarke, Michael D. D.

1994-01-01T23:59:59.000Z

10

Rail Access to Yucca Mountain: Critical Issues  

SciTech Connect (OSTI)

The proposed Yucca Mountain repository site currently lacks rail access. The nearest mainline railroad is almost 100 miles away. Absence of rail access could result in many thousands of truck shipments of spent nuclear fuel and high-level radioactive waste. Direct rail access to the repository could significantly reduce the number of truck shipments and total shipments. The U.S. Department of Energy (DOE) identified five potential rail access corridors, ranging in length from 98 miles to 323 miles, in the Final Environmental Impact Statement (FEIS) for Yucca Mountain. The FEIS also considers an alternative to rail spur construction, heavy-haul truck (HHT) delivery of rail casks from one of three potential intermodal transfer stations. The authors examine the feasibility and cost of the five rail corridors, and DOE's alternative proposal for HHT transport. The authors also address the potential for rail shipments through the Las Vegas metropolitan area.

Halstead, R. J.; Dilger, F.; Moore, R. C.

2003-02-25T23:59:59.000Z

11

Proposed Energy Transport Corridors: West-wide energy corridor...  

Broader source: Energy.gov (indexed) [DOE]

Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor...

12

Watering the Sun Corridor  

E-Print Network [OSTI]

Watering the Sun Corridor Managing Choices in Arizona's Megapolitan Area #12;#12;Managing ChoicesSored by Printing generously provided by SRP. Watering the Sun Corridor Tom Buschatzke, City of Phoenix Peter Culp i C y | 5 Introduction............................................7 I. The Sun Corridor

Hall, Sharon J.

13

Southwest Area Corridor Map | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

National Interest Electric Transmission Corridors October 2, 2007 Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007....

14

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

15

The Rail Alignment Environmental Impact Statement: An Update  

SciTech Connect (OSTI)

On July 23,2002, the President of the United States signed into law a joint resolution of the United States Congress designating the Yucca Mountain site in Nye County, Nevada, for development as a geologic repository for the disposal of spent nuclear fuel and high-level radioactive waste. If the US. Nuclear Regulatory Commission authorizes construction of the repository and receipt and possession of spent nuclear fuel and high-level radioactive at Yucca Mountain, the U.S. Department of Energy (DOE) would be responsible for transporting these materials to the Yucca Mountain repository as part of its obligation under the Nuclear Waste Policy Act. Part of the site recommendation decision included the analysis of a nation-wide shipping campaign to the proposed repository site. The ''Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada'' (February 2002) (Repository EIS) evaluated the potential impacts of the transportation of 70,000 Metric Tons of Heavy Metal spent nuclear fuel and high-level radioactive waste from 77 locations around the nation to the potential repository in Nevada over a 24 year shipping campaign. In the Repository EIS, DOE identified mostly rail as its preferred mode of transportation, both nationally and in the State of Nevada. In December 2003, based on public comments and the environmental analyses in the Repository EIS, DOE identified a preference for the Caliente rail corridor in Nevada. On April 8, 2004, DOE issued a Record of Decision (ROD) on the Mode of Transportation and Nevada Rail Corridor for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada. In this ROD, the DOE announced that it had decided to select the mostly rail scenario analyzed in the Repository EIS as the transportation mode both on a national basis and in the State of Nevada. Under the mostly rail scenario, the DOE would rely on a combination of rail, truck and possibly barge to transport to the repository site at Yucca Mountain up to 70,000 MTHM of spent nuclear fuel and high-level radioactive waste, with most of the spent nuclear fuel and high-level radioactive waste being transported by rail. This will ultimately require construction of a rail line in Nevada to the repository. In addition, the DOE has decided to select the Caliente rail corridor in which to examine potential alignments within which to construct that rail line. A corridor is a strip of land, approximately 400 meters (0.25 miles) wide, that encompasses one of several possible routes through which DOE could build a rail line. An alignment is the specific location of a rail line in a corridor, and would likely be 60 meters [200 feet] or less in width. Also on April 8, 2004, DOE issued a Notice of Intent to Prepare an Environmental Impact Statement for the Alignment, Construction, and Operation of a Rail Line to a Geologic Repository at Yucca Mountain, Nye County, NV. In the Notice of Intent, the Department announced its intent to prepare a Rail Alignment EIS to assist in selecting a possible alignment for construction of a rail line that would connect the repository at Yucca Mountain to an existing main rail line in Nevada. The Rail Alignment EIS also would consider the potential construction and operation of a rail-to-truck intermodal transfer facility, proposed to be located at the confluence of an existing mainline railroad and a highway, to support legal-weight truck transportation until the rail system is fully operational. This corridor is approximately 513 kilometers (319 miles) long and would cost an estimated $880 million (2001 dollars). Should DOE decide to build the Caliente corridor, it may be the longest rail line built in the United States since the Transcontinental Railroad was constructed in 1869. Some of the challenges in building this rail corridor are steep grades (the corridor crosses over 7 mountain ranges), isolated terrain, possible tunnels, and stakeholder acceptance.

R. Sweeney

2005-01-20T23:59:59.000Z

16

Western Energy Corridor -- Energy Resource Report  

SciTech Connect (OSTI)

The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

Leslie Roberts; Michael Hagood

2011-06-01T23:59:59.000Z

17

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...  

Energy Savers [EERE]

duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water heaters. Energize Phoenix eventually expanded its service area beyond the...

18

Comparative Cost Estimates Caliente Rail Corridor Summary Report  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME | NationalTbilisi08 to17 2.7 i R iii

19

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's Impact on OurSempriusEnergy PART 708PHEV

20

Rail ClipsRail Clips Track Renewal  

E-Print Network [OSTI]

Rail ClipsRail Clips and Track Renewal ver. 1 ME 6222: Manufacturing Processes and Systems Prof. J 2009 7 #12;Track Renewal 颅 Tie replacement ballast packingTie replacement, ballast packing ME 6222: Manufacturing Processes and Systems Prof. J.S. Colton 漏 GIT 2009 8 #12;Track Renewal ME 6222: Manufacturing

Colton, Jonathan S.

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Development of Improved Traveler Survey Methods for High-Speed Intercity Passenger Rail Planning  

E-Print Network [OSTI]

High-speed passenger rail is seen by many in the U.S. transportation policy and planning communities as an ideal solution for fast, safe, and resource-efficient mobility in high-demand intercity corridors. To expand the body of knowledge for high...

Sperry, Benjamin

2012-07-16T23:59:59.000Z

22

Innovative Corridors Initiative: Business Model Analysis  

E-Print Network [OSTI]

Wenger, Joyce. Business Models for Vehicle InfrastructureCorridors Initiative: Business Model Analysis Rachel S.Corridors Initiative: Business Model Analysis Task Order

Shaheen, Susan; Lingham, Viginia; Finson, Rachel S.

2007-01-01T23:59:59.000Z

23

Rail Planning Timeline  

Broader source: Energy.gov (indexed) [DOE]

dispatching center(s) during the duration of the actual movement of the first shipment to conduct oversight duties of the rail carrier dispatching center operations during periods...

24

Wabash River Heritage Corridor (Indiana)  

Broader source: Energy.gov [DOE]

The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee River, is considered a protected area, where...

25

Rail Routing Criteria Selection  

Broader source: Energy.gov (indexed) [DOE]

TEC 12 File name 13 Example: Four Alternate Rail Routes From Fernald, OH to Caliente, NV Map source: WebTRAGIS TEC 13 File name 14 Ranking Route Length Total Route Length...

26

1International High Speed Rail Conference 19642064 High Speed Rail  

E-Print Network [OSTI]

1International High Speed Rail Conference 1964颅2064 High Speed Rail: Celebrating Ambition 2014 by the Birmingham Centre for Railway Research and Education Conference programme 8 颅10 December 2014 Kindly supported by: #12;2 International High Speed Rail Conference Monday 8 December 12:00 颅 12:50 Registration

Birmingham, University of

27

HANFORD SITE RIVER CORRIDOR CLEANUP  

SciTech Connect (OSTI)

In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

BAZZELL, K.D.

2006-02-01T23:59:59.000Z

28

Energy Corridors on Federal Lands | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

of Federal Lands in States Identified by EPAct 2005 (August 2011) Related Links West-wide Energy Corridor Programmatic EIS Information Center East-wide Energy Corridor Programmatic...

29

Ultrasonic methods for rail inspection  

E-Print Network [OSTI]

operating speed over defective rail to 30 m.p.h. until jointoperating speed over the defective rail to 30 m.p.h. until jointThe operating speed cannot be over 30 m.p.h. C. Apply joint

Phillips, Robert Ronald

2012-01-01T23:59:59.000Z

30

Geologic selection methodology for transportation corridor routing  

E-Print Network [OSTI]

A lack of planning techniques and processes on long, linear, cut and cover-tunneling route transportation systems has resulted because of the advancement of transportation systems into underground corridors. The proposed methodology is tested...

Shultz, Karin Wilson

2002-01-01T23:59:59.000Z

31

An Inside Look at River Corridor  

Broader source: Energy.gov [DOE]

In the seventh chapter of燭he Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

32

Segmented rail linear induction motor  

DOE Patents [OSTI]

A segmented rail linear induction motor has a segmented rail consisting of a plurality of nonferrous electrically conductive segments aligned along a guideway. The motor further includes a carriage including at least one pair of opposed coils fastened to the carriage for moving the carriage. A power source applies an electric current to the coils to induce currents in the conductive surfaces to repel the coils from adjacent edges of the conductive surfaces.

Cowan, Jr., Maynard (1107 Stagecoach Rd. SE., Albuquerque, NM 87123); Marder, Barry M. (1412 Pinnacle View Dr. NE., Albuquerque, NM 87123)

1996-01-01T23:59:59.000Z

33

Segmented rail linear induction motor  

DOE Patents [OSTI]

A segmented rail linear induction motor has a segmented rail consisting of a plurality of nonferrous electrically conductive segments aligned along a guideway. The motor further includes a carriage including at least one pair of opposed coils fastened to the carriage for moving the carriage. A power source applies an electric current to the coils to induce currents in the conductive surfaces to repel the coils from adjacent edges of the conductive surfaces. 6 figs.

Cowan, M. Jr.; Marder, B.M.

1996-09-03T23:59:59.000Z

34

Ionic Liquid-Enhanced Solid State Electrolyte Interface (SEI...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Liquid-Enhanced Solid State Electrolyte Interface (SEI) for Lithium Sulfur Batteries. Ionic Liquid-Enhanced Solid State Electrolyte Interface (SEI) for Lithium Sulfur Batteries....

35

Direct Visualization of Initial SEI Morphology and Growth Kinetics...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Initial SEI Morphology and Growth Kinetics During Lithium Deposition by in situ Electrochemical Direct Visualization of Initial SEI Morphology and Growth Kinetics During Lithium...

36

Draft SPD SEIS Master Reference List | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Policy Act (NEPA) NEPA Reading Room Surplus Plutonium Disposition Supplemental Environmental Impact Statement Draft SPD SEIS Master Reference List Draft SPD SEIS Master...

37

The Environmental Injector: Beyond Common Rail and Hydraulic...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

The Environmental Injector: Beyond Common Rail and Hydraulic Intensificatiion The Environmental Injector: Beyond Common Rail and Hydraulic Intensificatiion The Environmental...

38

I-65, America's First BioFuels Corridor: Timeline and Map  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

65 America's First BioFuels Corridor Timeline www.I65BioFuelsCorridor.com Corridor Partners 1 10 2 5 4 3 6 7 8 9 I 65 America's First BioFuels Corridor Timeline...

39

Rail Transportation and Engineering Center (RailTEC) The University of Illinois at Urbana-Champaign  

E-Print Network [OSTI]

Rail Transportation and Engineering Center (RailTEC) The University of Illinois at Urbana Effects and Interaction of Terminal and Mainline Delay Rail Operational and Energy Efficiency -Passenger Rail Energy Consumption and Emissions Relative to Competing Modes -Economic and Operating Impacts

Illinois at Urbana-Champaign, University of

40

www.ave.kth.se Rail Vehicles  

E-Print Network [OSTI]

www.ave.kth.se Rail Vehicles Part of the Masters program in Vehicle Engineering Master's Thesis: Validation of wheel wear calculation code Background Rail vehicle operators have a genuine concern about wheel and rail wear prediction methodologies, due to the influence of worn profiles in the cost of both

Haviland, David

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

7.1.1. Fernbahnhof / Rail Station  

E-Print Network [OSTI]

Fernbahnhofs 7.1.1.4.5 K鋖teversorgung des Fernbahnhofs / Cooling Supply of Rail Station 7 Abwasserversorgung des Fernbahnhofs / Fresh and Used Water Supply of Rail Stations 7.1.1.4.1.1 Verfahren zur Fernbahnhofs 7.1.1.4.2 Stromversorgung des Fernbahnhofs / Power Supply of Rail Station 7

Berlin,Technische Universit鋞

42

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor .  

E-Print Network [OSTI]

??Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line (more)

Dohm, James

2012-01-01T23:59:59.000Z

43

EIS-0250: Notice of Preferred Nevada Rail Corridor | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct,Final9:DepartmentExtension of:Department of Energy

44

Common Rail Injection System Development  

SciTech Connect (OSTI)

The collaborative research program between the Department of energy and Electro-Motive Diesels, Inc. on the development of common rail fuel injection system for locomotive diesel engines that can meet US EPA Tier 2 exhaust emissions has been completed. This final report summarizes the objectives of the program, work scope, key accomplishments and research findings. The major objectives of this project encompassed identification of appropriate injection strategies by using advanced analytical tools, development of required prototype hardware/controls, investigations of fuel spray characteristics including cavitation phenomena, and validation of hareware using a single-cylinder research locomotive diesel engine. Major milestones included: (1) a detailed modeling study using advanced mathematical models - several various injection profiles that show simultaneous reduction of NOx and particulates on a four stroke-cycle locomotive diesel engine were identified; (2) development of new common rail fuel injection hardware capable of providing these injection profiles while meeting EMD engine and injection performance specifications. This hardware was developed together with EMD's current fuel injection component supplier. (3) Analysis of fuel spray characteristics. Fuel spray numerical studies and high speed photographic imaging analyses were performed. (4) Validation of new hardware and fuel injection profiles. EMD's single-cylinder research diesel engine located at Argonne National Laboratory was used to confirm emissions and performacne predictions. These analytical ane experimental investigations resulted in optimized fuel injection profiles and engine operating conditions that yield reductions in NOx emissions from 7.8 g/bhp-hr to 5.0 g/bhp-hr at full (rated) load. Additionally, hydrocarbon and particulate emissions were reduced considerably when compared to baseline Tier I levels. The most significant finding from the injection optimization process was a 2% to 3% improvement in fuel economy over EMD's traditional Tier I engine hardware configuration. the common rail fuel injection system enabled this added benefit by virtue of an inherent capability to provide multiple injections per power stroke at high fuel rail pressures. On the basis of the findings in this study, EMD concludes that the new electronically-controlled high-pressure common rail injection system has the potential to meet locomotive Tier 2 NOx and particulates emission standards without sacrificing the fuel economy. A number of areas to further improve the injection hardware and engine operating characteristics to further exploit the benefits of common rail injection system have also been identified.

Electro-Motive,

2005-12-30T23:59:59.000Z

45

Stockholm Environment Institute (SEI) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop, Inc Place: MissouriPrograms | OpenSEI) Jump to: navigation, search

46

Spectrum Energy Inc SEI | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g GrantAtlas (PACA Region -SonelgazSunbelt WindAssociationSpeciesSEI

47

Stockholm Environment Institute (SEI) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g GrantAtlas (PACAOpen Energy Information 2)Institute (SEI)

48

Identification of High-Speed Rail Ballast Flight Risk Factors and Risk Mitigation Strategies  

E-Print Network [OSTI]

Francesco Bedini Jacobini, Erol Tutumluer, Mohd Rapik Saat Rail Transportation and Engineering Center (Rail

Barkan, Christopher P.L.

49

Bridge deck designs for railing impacts  

E-Print Network [OSTI]

AND MATERIALS TESTING Concrete Steel CHAPTER IV. TEXAS BRIDGE RAILING TYPE T101 Description . Tests on the T101 Steel Post with a Rigid Support . Static Tests on the Standard T101 Bridge Railing Dynamic Tests on the Standard T101 Bridge Railing . Tests... Stress Calculations on Bridge Deck Connection to Texas T202 Concrete Wall Table A-3. Flexure Stress Calculations on Bridge Deck Connection to Texas T5 Bridge Rail Table 8-1. Concrete Cylinder Compression Tests Table 8-2. Reinforcing Steel Tensile...

Arnold, Althea Gayle

1984-01-01T23:59:59.000Z

50

TEC Rail TG Summary_Kansas City  

Broader source: Energy.gov (indexed) [DOE]

January 31-February 1, 2007 Atlanta, Georgia Rail Topic Group Mr. Thrower (OCRWMOLM) introduced Mr. Blackwell (FRA), who gave a presentation on the DOT Notice of Proposed...

51

Optimization Online - Shunting Minimal Rail Car Allocation  

E-Print Network [OSTI]

Jun 30, 2003 ... Abstract: We consider the rail car management at industrial in-plant railroads. Demands for materials or empty cars are characterized by a track,...

Marco E. Luebbecke

2003-06-30T23:59:59.000Z

52

Advanced Diesel Common Rail Injection System for Future Emission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Common Rail Injection System for Future Emission Legislation Advanced Diesel Common Rail Injection System for Future Emission Legislation 2004 Diesel Engine Emissions Reduction...

53

Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel...  

Broader source: Energy.gov (indexed) [DOE]

Assisted Diesel Combustion in a Common Rail Turbodiesel Engine P-3 Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel Engine P-3 Gregory Lilik, Jos Martn...

54

Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel Engine Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel Engine This study measured the effects of...

55

Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructu...  

Broader source: Energy.gov (indexed) [DOE]

Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructure Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructure Fractal dimensions of particle...

56

Selection of Processes for Welding Steel Rails  

E-Print Network [OSTI]

...._ _) Selection of Processes for Welding Steel Rails by N.S. Tsai* and T.W. Eagar* ABSTRACT 421 The advantages and limitations ofseveral conventional and prospective rail welding processes are reviewed with emphasis on the heat input rate, on joint preparation, on post weld grinding and on resultant metallurgical

Eagar, Thomas W.

57

Can dispersal mode predict corridor effects on plant parasites?  

SciTech Connect (OSTI)

Habitat corridors, a common management strategy for increasing connectivity in fragmented landscapes, have experimentally validated positive influences on species movement and diversity. However, long-standing concerns that corridors could negatively impact native species by spreading antagonists, such as disease, remain largely untested. Using a large-scale, replicated experiment, we evaluated whether corridors increase the incidence of plant parasites. We found that corridor impacts varied with parasite dispersal mode. Connectivity provided by corridors increased incidence of biotically dispersed parasites (galls on Solidago odora) but not of abiotically dispersed parasites (foliar fungi on S. odora and three Lespedeza spp.). Both biotically and abiotically dispersed parasites responded to edge effects, but the direction of responses varied across species. Although our results require additional tests for generality to other species and landscapes, they suggest that, when establishing conservation corridors, managers should focus on mitigating two potential negative effects: the indirect effects of narrow corridors in creating edges and direct effects of corridors in enhancing connectivity of biotically dispersed parasites.

Sullivan, Lauren, L.; Johnson, Brenda, L.; Brudvig, Lars, A.; Haddad, Nick, M.

2011-08-01T23:59:59.000Z

58

Northeast Corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. to Boston, MA. Volume 3. Technical appendices. Final report, September 1992-September 1993  

SciTech Connect (OSTI)

The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 x 25,000 volt - 60 hertz power system. The volume Number III contains the detailed technical studies that were performed in order to identify and evaluate the environmental impacts of the proposed project. Some of these studies have been included entirely in the Draft Environmental Impact Statements-draft (DEIS/R) (Volume 1). The technical evaluations performed were based upon regulatory requirements as well as substantive issues raised by individuals and public agencies as part of the public participation program.

Not Available

1993-09-01T23:59:59.000Z

59

SPD SEIS References for Appendix D | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

SEIS for Review," July 20. 405 LANL (Los Alamos National Laboratory), 2012a, Final Report, Data Call to Support the Surplus Plutonium Disposition Supplemental Environmental...

60

Thiago Bizarria, Ryan Kernes, Riley Edwards Joint Rail Conference  

E-Print Network [OSTI]

variation in temperature FMEA Analysis #12;Slide 7Mechanistic behavior of rail pad assemblies Mechanics

Barkan, Christopher P.L.

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Determination of Longitudinal Stress in Rails  

E-Print Network [OSTI]

The objective of this research is to determine the longitudinal stress in rails by using the polarization of Rayleigh waves. Analytical models are developed to describe the effect of applied stress on wave speed and on the polarization of Rayleigh...

Djayaputra, Ferdinand

2012-02-14T23:59:59.000Z

62

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up AmaSeis  

E-Print Network [OSTI]

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up Ama the Arduino drivers. Take note of the assigned com port number, and set up AmaSeis to that number. 3. Some computers will require the following. Keep in mind, Arduino, does not need to run or be involved. You just

Barrash, Warren

63

Optimal Railroad Rail Grinding for Fatigue Mitigation  

E-Print Network [OSTI]

............................................................................. 25 2.4.1 FEA of Wheel-Rail Contact with an Elastic Material ...... 25 2.4.2 FEA of Wheel-Rail Contact with Plasticity Model .......... 27 2.5 Results and Discussion ................................................................. 28... 2.5.1 The Steady State of Residual Stresses .............................. 30 2.5.2 Accumulation of Residual Stresses in Rolling Contact .... 31 2.5.3 Comparisons between the Equivalent Rolling Stresses of Elastic and Hardening...

Tangtragulwong, Potchara

2012-02-14T23:59:59.000Z

64

Weather conditions affecting VTOL airbus operations in the Northeast Corridor  

E-Print Network [OSTI]

A detailed study of hourly weather observations in the Northeast Corridor during the periods 0600-2400 for a ten year period 1944-1958 was made to study the implications of weather affecting the operations of a VSTOL Airbus ...

Simpson, R. W.

1966-01-01T23:59:59.000Z

65

The opportunistic green : building on Toronto's utility corridor  

E-Print Network [OSTI]

The Green Line or hydro corridors of Toronto are sprawling lengths of continuous, mostly vacant land used for the primary purpose of transmitting electricity. They are unusual terrain, physically sparse but culturally ...

Rahimi, Kamyar

2014-01-01T23:59:59.000Z

66

I-65 Clean Corridor: Fall Drive Overview and Media Summary  

Broader source: Energy.gov [DOE]

At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

67

The Canary Eddy Corridor: A major pathway for long-lived eddies in the subtropical North Atlantic  

E-Print Network [OSTI]

corridor, whose source is the flow perturbation of the Canary Current and the Trade Winds at the Canary westward- propagating eddy corridors were also detected: two small corridors north and south of the Azores Front; a small zonal corridor located near 31 % oN, south of the island of Madeira; and a small corridor

Dong, Changming "Charles"

68

Sei'ichi Shirai and subjective method of synthesis  

E-Print Network [OSTI]

If modernism in architecture is based on a rational, objective approach, Sei'ichi Shirai was a unique architect who created his own subjective value system, which resulted in isolating him from the modern movement. Educated ...

Nagaya, Toshiaki

1988-01-01T23:59:59.000Z

69

RIVER CORRIDOR BUILDINGS 324 & 327 CLEANUP  

SciTech Connect (OSTI)

A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D&D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km{sup 2} (1 mi{sup 2})300 Area comprises only a small part of the 1517 km{sup 2} (586 mi{sup 2}) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D&D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building.

BAZZELL, K.D.; SMITH, B.A.

2006-02-09T23:59:59.000Z

70

Development Impacts of high-speed rail : megalopolis formation and implications for Portugal's Lisbon-Porto High-Speed Rail Link  

E-Print Network [OSTI]

High-speed rail (HSR) has been gaining acceptance worldwide with development of rail technology and rising concerns over climate change and congestion in airports and on roads. The implementation of high-speed rail lines ...

Melibaeva, Sevara (Sevara Mukhtarovna)

2010-01-01T23:59:59.000Z

71

An analytical study of rail grinding optimization for rail-head fatigue defect prevention  

E-Print Network [OSTI]

and increased train traffic on the remaining routes. These changes in railroad industry practice have caused an increase in the rate of occurrence of rail head fatigue defects, one potential cause of train derailment. The primary form of maintenance employed...

Jones, Scott Laurence

1997-01-01T23:59:59.000Z

72

I-65, America's First BioFuels Corridor: Timeline and Map | Department...  

Broader source: Energy.gov (indexed) [DOE]

I-65, America's First BioFuels Corridor: Timeline and Map I-65, America's First BioFuels Corridor: Timeline and Map At the May 1, 2008 joint quarterly Web conference of DOE's...

73

Dispatcher Reliability Analysis : SPICA-RAIL Experiments  

E-Print Network [OSTI]

Dispatcher Reliability Analysis : SPICA-RAIL Experiments Fabien Belmonte, Jean-Louis Boulanger of scenarios and evaluate the behaviour of human operators. A state of the art in human reliability is pre coupled to a traffic simulator. It allows to gather data for human reliability evaluation and man

Paris-Sud XI, Universit茅 de

74

Rail gun development for EOS research  

SciTech Connect (OSTI)

The status of a railgun program for EOS research in progress at Los Alamos and Livermore National Laboratories is described. The operating principle of rail guns, the power supplies used to drive them, diagnostic techniques used to monitor their performance and initial efforts to develop projectiles suitable for EOS research are discussed. (WHK)

Fowler, C.M.; Peterson, D.R.; Hawke, R.S.; Brooks, A.L.

1981-01-01T23:59:59.000Z

75

Intercity Passenger Rail Federal Funding presented by  

E-Print Network [OSTI]

Intercity Passenger Rail 颅 Federal Funding Process presented by: Minnesota Department, equipment and connections 路! Long term: build efficient HSR network 颅! Connecting major population centers 路! Lead state on Milwaukee to Twin Cities segment 路! 2008 state bonding to match federal funds

Minnesota, University of

76

Environmental Life-cycle Assessment of Passenger Transportation: A Detailed Methodology for Energy, Greenhouse Gas and Criteria Pollutant Inventories of Automobiles, Buses, Light Rail, Heavy Rail and Air  

E-Print Network [OSTI]

A Life-Cycle Model of an Automobile, Environmental Science &Pollutant Inventories of Automobiles, Buses, Light Rail,Pollutant Inventories of Automobiles, Buses, Light Rail,

Chester, Mikhail; Horvath, Arpad

2007-01-01T23:59:59.000Z

77

Autonomous Corridor Flight of a UAV Using an RGB-D Camera  

E-Print Network [OSTI]

Autonomous Corridor Flight of a UAV Using an RGB-D Camera System Overview We describe the first application of the novel Kinect RGB-D sensor on a fully autonomous quadrotor UAV. We apply the UAV in an indoor corridor scenario. The position and orientation of the UAV inside the corridor is extracted from

Cremers, Daniel

78

SAFETY ANALYSIS ON RAIL HIGHWAY AT-GRADE CROSSING IN ALABAMA  

E-Print Network [OSTI]

Administration (FRA) database 路 Highway-rail crossing inventory 路 Highway-rail crossing history file 路 Highway-rail crossing accident database Alabama Department of Transportation (ALDOT) database 路 Rail-highway at,720 RHGCs FRA highway-rail crossing history file Crossing ID Crossing characteristics Crash count over 1998

Illinois at Urbana-Champaign, University of

79

Linear Utility Corridors--A Simulated Visual Field Trip1  

E-Print Network [OSTI]

and shapes that are precisely defined by line." He goes on to define "utility" as: "The condition or quality or energy from one point to another in a straight or series of generally straight lines." Linear utility as components of linear utility corridors can surely include telephone lines and various aqueducts and canals

Standiford, Richard B.

80

The Valley Fever Corridor Year 2 Fundraising Status  

E-Print Network [OSTI]

Marianne Stephens Ray Thurston Valley of the Sun Boston Terrier Club Mark Whitaker Nickel $500The Valley Fever Corridor Year 2 Fundraising Status Goal = $85,000 Updated: 2/15/2011 *The Valley Fever Clinic Titanium $5,000 or more: Anonymous Shirley and Ken Cole Heller Foundation

Arizona, University of

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring...  

Broader source: Energy.gov (indexed) [DOE]

Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup Draft Work Plan - February 4, 2008 More...

82

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Broader source: Energy.gov (indexed) [DOE]

Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Radiation Monitoring Subgroup Radiation Monitoring Subgroup October 11, 2007 More...

83

Northeast corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. To Boston, MA. Volume 1. Final report, September 1992-September 1993  

SciTech Connect (OSTI)

The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 X 25,000 volt - 60 hertz power system. This volume considers impacts on the Human and Natural Environment utilizing guidance as outlined in CFR Part 1500, Council on Environmental Quality, Regulations for Implementing the Procedural Requirements of NEPA as amended and the Massachusetts Environmental Policy Act (MEPA) regulations (301 CMR 11:00). Impacts analyzed include changes in the natural environment (air quality, noise and vibration, energy, electromagnetic fields, natural resources, hazardous materials and visual/aesthetics), changes in the social environment (land use and recreation, transportation and traffic), impacts on historic and archaeological sites, changes in transit service and patronage, associated changes in highway and airport congestion, capital costs, operating and maintenance costs, and financial implications. Impacts are identified both for the proposed construction period and for the long-term operation of the alternatives.

Not Available

1993-09-01T23:59:59.000Z

84

Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council  

SciTech Connect (OSTI)

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC抯 work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: ? Federal land jurisdiction, ? Existing Section 368 corridors, ? Existing transmission lines, ? Previously studied corridor locations, and ? Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: ? The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. ? Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. ? Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

2014-02-24T23:59:59.000Z

85

2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract抯 revegetation and mitigation areas on the Hanford Site.

C. T. Lindsey, A. L. Johnson

2010-09-30T23:59:59.000Z

86

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor抯 revegetation and mitigation areas on the Hanford Site.

West, W. J.; Lucas, J. G.; Gano, K. A.

2011-11-14T23:59:59.000Z

87

High Speed Rail in America Thomas Ducharme, Matt Schena,  

E-Print Network [OSTI]

International Airport. 路 Florida is on track to open one of America's first HSR express service between Tampa Situation of High Speed Rail 路 The US only has one high speed rail o Acela Which runs from Boston Airport congestion o By eliminating 900,000 city to city flights 路 Give access to cheaper long distance

Nagurney, Anna

88

CONTINUOUS FLOW "RAIL-AND-TRAP" MICROFLUIDIC PROCESSORS FOR AUTONOMOUS  

E-Print Network [OSTI]

CONTINUOUS FLOW "RAIL-AND-TRAP" MICROFLUIDIC PROCESSORS FOR AUTONOMOUS BEAD-BASED MIXING laborious and time intensive fluidic mixing procedures. Although microfluidic platforms offer significant, here we present a microfluidic "rail-and-trap" processor that functions autonomously under continuous

Lin, Liwei

89

Rail Splitter Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant of Access Permit5-ID-aREC SolarRadium HotRail Splitter Wind Farm

90

Main Draft SEIS References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACMEFUTUREMain Draft SEIS References |

91

EIS-0386: Designation of Energy Corridors on Federal Land in Western States  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to designatate corridors on Federal land in the eleven Western States for oil, gas and hydrogen pipelines and electricity transmission and distribution facilities.

92

River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1  

SciTech Connect (OSTI)

This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

Project Integration

2005-09-26T23:59:59.000Z

93

Nest predation, predator abundance, and avian diversity in transmission line corridors and adjacent habitats in east central Texas  

E-Print Network [OSTI]

corridors may have differential effects on wildlife communities in adjacent vegetation types in a heterogeneous landscape. I evaluated the effects of ROW corridors on avian and nest predator communities in forests and pastures in east central Texas in 1998...

Hubbard, Tani Ann

2000-01-01T23:59:59.000Z

94

Energy Corridors on Federal Lands | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ ContractEndstatesEnergy Corridors on Federal Lands Energy

95

DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007.

96

Heat Transfer in Underground Rail Tunnels  

E-Print Network [OSTI]

The transfer of heat between the air and surrounding soil in underground tunnels ins investigated, as part of the analysis of environmental conditions in underground rail systems. Using standard turbulent modelling assumptions, flow profiles are obtained in both open tunnels and in the annulus between a tunnel wall and a moving train, from which the heat transfer coefficient between the air and tunnel wall is computed. The radial conduction of heat through the surrounding soil resulting from changes in the temperature of air in the tunnel are determined. An impulse change and an oscillating tunnel air temperature are considered separately. The correlations between fluctuations in heat transfer coefficient and air temperature are found to increase the mean soil temperature. Finally, a model for the coupled evolution of the air and surrounding soil temperature along a tunnel of finite length is given.

Sadokierski, Stefan

2007-01-01T23:59:59.000Z

97

Robotics virtual rail system and method  

DOE Patents [OSTI]

A virtual track or rail system and method is described for execution by a robot. A user, through a user interface, generates a desired path comprised of at least one segment representative of the virtual track for the robot. Start and end points are assigned to the desired path and velocities are also associated with each of the at least one segment of the desired path. A waypoint file is generated including positions along the virtual track representing the desired path with the positions beginning from the start point to the end point including the velocities of each of the at least one segment. The waypoint file is sent to the robot for traversing along the virtual track.

Bruemmer, David J. (Idaho Falls, ID); Few, Douglas A. (Idaho Falls, ID); Walton, Miles C. (Idaho Falls, ID)

2011-07-05T23:59:59.000Z

98

Improved performance of railcar/rail truck interface components  

E-Print Network [OSTI]

turning moments around curved track, wear of truck components, and increased detrimental dynamic effects. The recommended improvement of the rail truck interface is a set of two steel inserts, one concave and one convex, that can be retrofit to center...

Story, Brett Alan

2009-05-15T23:59:59.000Z

99

Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructu...  

Broader source: Energy.gov (indexed) [DOE]

Rail Pressure and Biodiesel Composition on Soot Nanostructure P-20 Ye, P 1 ; Sun, C-X 1 ; Lapuerta, M 2 ; Agudelo, J 3 ; Vander Wal, R 1 ; Boehman, AL 1 , Toops, TJ 4 ; Daw, CS 4...

100

Novel monitoring system to diagnose rail track foundation problems  

E-Print Network [OSTI]

A low cost, remote monitoring system has been developed to diagnose rail track subgrade failures. The portable monitoring system consists of five liquid vertical settlement probes, one piezometer, a small data acquisition ...

Aw, Eng Sew, 1978-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Planning for a regional rail system : analysis of high speed and high quality rail in the Basque region  

E-Print Network [OSTI]

The goal of this thesis is to provide guidance for regional rail network planning to achieve the maximum benefits in terms of economic growth, passenger satisfaction, and environmental sustainability. The hypothesis is ...

Lewis, Paul R. S. (Paul Robinson S.)

2011-01-01T23:59:59.000Z

102

Microsoft PowerPoint - xxDraft SEIS PUBLIC MEETING PRESENTATION...  

National Nuclear Security Administration (NNSA)

Impact Statement (SEIS) for the Production of Tritium in a Commercial Light Water Reactor Background * NNSA is the federal agency responsible for providing the nation...

103

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

104

The effect of transmission-line corridor edge and successional stage on the animal community. Final report  

SciTech Connect (OSTI)

Using breeding success as a criterion of habitat quality, this report evaluates the suitability of 2 transmission-line corridor habitat types, grassland and shrubland, for open-nesting passerines in western Maryland. The main objectives were to investigate the patterns of fledging success and spatial distribution of nests in each habitat type in relation to the corridor, corridor-forest edge, and the adjacent forest, and to quantify important features of the microhabitat of corridor and forest nests that may influence nest success. The second part of this report examines the effect of a transmission-line corridor on forest animal communities by monitoring their activity patterns in the corridor. Animal activity patterns are compared between a transmission-line corridor that was maintained in shrubby vegetation by selective spraying of herbicides and one that was managed for herbaceous vegetation by mowing with rotary mowers.

Gates, D.J.E.

1982-01-01T23:59:59.000Z

105

ILLINOIS -RAILROAD ENGINEERING Understanding the Transition Behavior of  

E-Print Network [OSTI]

at Level Crossings on US High Speed Rail Shared Corridors Francesco Bedini Jacobini PhD Student Rail

Illinois at Urbana-Champaign, University of

106

District heating feasibility, Industrial Corridor, Jamestown, New York  

SciTech Connect (OSTI)

The Industrial Corridor of Jamestown, New York, contains more than twenty industrial/manufacturing companies, whose thermal demands, in addition to space heating, include significant process heating loads. This study investigated in depth, the technical and economic feasibility of implementing a district heating system in the Industrial Corridor which can serve both process and space heating loads. Based upon the heat load assessment conducted, the study focused upon nine companies with the largest thermal demand. Alternative system implementation designs were considered including new conventional centralized boiler plants, gas turbine cogeneration, and both high temperature hot water and steam as the heat transport media in an underground distribution system. The study concluded that, in view of the nature of existing prospective customer loads being primarily steam based, the most economical system for near term phased development is a steam based system with a new conventional centrally located steam boiler plant. The economic potential for a cogeneration system was found to be sensitive to electricity buy back rates, which at present, are not attractive. Implementing a modern high temperature hot water system would require significant customer retrofit costs to convert their steam based systems to hot water, resulting in long and unattractive pay back periods. Unless customer hot water retrofit costs can be expended without penalty to the district system economics, hot water district heating is not considered economically feasible. Chapters describe heat load assessment; heat source analysis; system implementation; transmission and distribution systems assessment; institutional assessment; system economic analysis; and customer retrofit, economic analysis, and conclusions 20 figs., 22 tabs.

Not Available

1988-06-01T23:59:59.000Z

107

Galp e seis universidades lanam Instituto do Petrleo e do Gs  

E-Print Network [OSTI]

Galp e seis universidades lan鏰m Instituto do Petr髄eo e do G醩 ? ENSINO A GALP Energia e as seis maiores universidades portuguesas anuncia- ram a cria玢o do Instituto do Petr- leo e do G醩 para desenvolver inves- tiga玢o e forma玢o nas 醨eas do pe- tr髄eo e do g醩 no mundo lus骹ono. O Instituto do

Instituto de Sistemas e Robotica

108

Minneapolis and Saint Paul, Minnesota: Solar in Action (Brochure...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

stakeholders to create the Energy Innovation Corridor along the proposed Central Corridor light-rail line connecting the two downtowns. The Energy Innovation Corridor will feature...

109

Union Station, Tacoma, Washington : a design study for a surplus rail site  

E-Print Network [OSTI]

Recent technological changes in railroads, mergers, major shifts in urban land use patterns, and declining rail passenger travel has resulted in a surplus of urban rail lands. These lands represent a significant resource ...

Rhoads, Jeffrey David

1982-01-01T23:59:59.000Z

110

High-speed rail commuting in the United States : a case study in California  

E-Print Network [OSTI]

High-speed rail (HSR) is primarily for intermediate distance intercity passenger travel. The concept of high-speed rail commuting is to provide short distance commuting transportation service on dedicated HSR, by sharing ...

Kasuya, Shuichi, 1972-

2005-01-01T23:59:59.000Z

111

Using land value capture to fund rail transit extensions in Mexico City and Santiago de Chile  

E-Print Network [OSTI]

The effects of rail rapid transit on land uses and land values are discussed. Rail transit can enhance accessibility, and can raise the demand for locating in areas around stations, increasing land value, and in some cases ...

Covarrubias, Alvaro, 1973-

2004-01-01T23:59:59.000Z

112

I:\\Archive\\Projects - NUMBERED\\8000\\8400\\8404 Rail Presentation...  

Broader source: Energy.gov (indexed) [DOE]

905 8404.3 905 First Rail Shipment: April 26, 1999 54 Railcars As of Today: Unit trains shipped 158 Railcars shipped 9,380 Tons shipped 1,009,176 First Rail Shipment: April...

113

Feasibility of an Aeronautical Mobile Ad Hoc Network Over the North Atlantic Corridor  

E-Print Network [OSTI]

Aerospace Center (DLR), Munich, Germany Email: {Daniel attractive scenario, the North Atlantic Corridor, and use realistic flight data to extract statistics about. INTRODUCTION Today's civil aviation airliners are typically equipped with a set of data communications

Schindelhauer, Christian

114

Creating sustainable air rights development over highway corridors : lessons from the Massachusetts Turnpike in Boston  

E-Print Network [OSTI]

Research and practice have shown that air rights development over highway corridors in America's cities is not only feasible, but desirable. As planners, policy makers and consumers attempt to curb the sprawling development ...

Campbell, Bonnie E., 1977-

2004-01-01T23:59:59.000Z

115

Aesthetic responses to urban greenway trail corridors: Implications for sustainable development in tourism and recreation settings  

E-Print Network [OSTI]

that viewed two urban greenway trail corridors. Each trail had three treatments including the existing trail condition, a manipulated trail condition, and a reverse in direction of the existing trail condition. Analyses were conducted to 1) identify...

Chon, Jin Hyung

2005-08-29T23:59:59.000Z

116

Department of Energy Seeks Public Comment on Designation of Energy Corridors in the West  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) announced that it and several other federal agencies will host eleven public meetings to discuss the designation of multi-purpose energy corridors on federal lands in the western United States.

117

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network [OSTI]

5. Ballester, F. Air Pollution and Health: An Overview WithAir Pollution and Mortality, Special Report, Health Effectshealth impacts of freight operations in the corridor could be quite extensive. Estimates of air pollution

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

118

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network [OSTI]

Authority. Number of Trains Running on the Alameda Corridor.An Analysis of PM and NO x Train Emissions in the Alamedaefficient than trucks, trains contribute heavily to regional

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

119

Using Strain Gauges to Detect Epoxy Debonding in Insulated Rail Joints  

E-Print Network [OSTI]

within a control block. Adjacent circuits within the track are separated by insulated rail joints (alsoUsing Strain Gauges to Detect Epoxy Debonding in Insulated Rail Joints Daniel Peltier, Christopher mainline track. These require insulated rail joints every several kilometers in order to electrically

Barkan, Christopher P.L.

120

Evaluation of the relationship between diversion percentage and delay in a freeway corridor in Houston, Texas  

E-Print Network [OSTI]

EVALUATION OF THE RELATIONSHIP BETWEEN DIVERSION PERCENTAGE AND DELAY IN A FREEWAY CORRIDOR IN HOUSTON, TEXAS A Thesis by SIBOK LEE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment... of the requirements for the degree of MASTER OF SCIENCE August 1991 Major Subject: Civil Engineering EVALUATION OF THE RELATIONSHIP BETWEEN DIVERSION PERCENTAGE AND DELAY IN A FREEWAY CORRIDOR IN HOUSTON, TEXAS A Thesis by SIBOK LEE Approved as to style...

Lee, Sibok

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EIS-0406: Designation of Energy Corridors on Federal Land in 39 States  

Broader source: Energy.gov [DOE]

DOE has canceled this EIS, which was to evaluate the environmental impacts of the designation, under Section 368(b) of the Energy Policy Act of 2005, of energy corridors on federal lands in 39 nonwestern states. The corridors, which were to be jointly identified by the Secretaries of Agriculture, Commerce, Defense, Energy, and the Interior, might have been used for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities.

122

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors  

E-Print Network [OSTI]

A KTEC Center of Excellence 1 Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors Martin Kuehnhausen Department of Electrical Engineering & Computer Science Master's Thesis Defense July 1, 2009 Committee Dr. Victor...Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors c 2009 Martin Kuehnhausen Submitted to the Department of Electrical Engineering & Computer Science and the Graduate Faculty of the University of Kansas in partial...

Kuehnhausen, Martin

2009-07-10T23:59:59.000Z

123

Turbine blade squealer tip rail with fence members  

DOE Patents [OSTI]

A turbine blade includes an airfoil, a blade tip section, a squealer tip rail, and a plurality of chordally spaced fence members. The blade tip section includes a blade tip floor located at an end of the airfoil distal from the root. The blade tip floor includes a pressure side and a suction side joined together at chordally spaced apart leading and trailing edges of the airfoil. The squealer tip rail extends radially outwardly from the blade tip floor adjacent to the suction side and extends from a first location adjacent to the airfoil trailing edge to a second location adjacent to the airfoil leading edge. The fence members are located between the airfoil leading and trailing edges and extend radially outwardly from the blade tip floor and axially from the squealer tip rail toward the pressure side.

Little, David A

2012-11-20T23:59:59.000Z

124

Development of a guardrail-to-bridge rail transition  

E-Print Network [OSTI]

DEVELOPMENT OF A GUARDRAIL-TO-BRIDGE RAIL TRANSITION A Thesis by ROGER PATRICK JUDE BLIGH Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1988... Major Subject: Civil Engineering DEVELOPMENT OF A GUARDRAIL-TO-BRIDGE RAIL TRANSITION A Thesis by ROGER PATRICK JUDE BLIGH Approved as to style and content by: ayes E. Ross, (C air of Comm ttee) Eugene Buth (Member) J seph M. Herrmann (Member...

Bligh, Roger P

1988-01-01T23:59:59.000Z

125

USED FUEL RAIL SHOCK AND VIBRATION TESTING OPTIONS ANALYSIS  

SciTech Connect (OSTI)

The objective of the rail shock and vibration tests is to complete the framework needed to quantify loads of fuel assembly components that are necessary to guide materials research and establish a technical basis for review organizations such as the U.S. Nuclear Regulatory Commission (NRC). A significant body of experimental and numerical modeling data exists to quantify loads and failure limits applicable to normal conditions of transport (NCT) rail transport, but the data are based on assumptions that can only be verified through experimental testing. The test options presented in this report represent possible paths for acquiring the data that are needed to confirm the assumptions of previous work, validate modeling methods that will be needed for evaluating transported fuel on a case-by-case basis, and inform material test campaigns on the anticipated range of fuel loading. The ultimate goal of this testing is to close all of the existing knowledge gaps related to the loading of used fuel under NCT conditions and inform the experiments and analysis program on specific endpoints for their research. The options include tests that would use an actual railcar, surrogate assemblies, and real or simulated rail transportation casks. The railcar carrying the cradle, cask, and surrogate fuel assembly payload would be moved in a train operating over rail track modified or selected to impart shock and vibration forces that occur during normal rail transportation. Computer modeling would be used to help design surrogates that may be needed for a rail cask, a cask抯 internal basket, and a transport cradle. The objective of the design of surrogate components would be to provide a test platform that effectively simulates responses to rail shock and vibration loads that would be exhibited by state-of-the-art rail cask, basket, and/or cradle structures. The computer models would also be used to help determine the placement of instrumentation (accelerometers and strain gauges) on the surrogate fuel assemblies, cask and cradle structures, and the railcar so that forces and deflections that would result in the greatest potential for damage to high burnup and long-cooled UNF can be determined. For purposes of this report we consider testing on controlled track when we have control of the track and speed to facilitate modeling.

Ross, Steven B.; Best, Ralph E.; Klymyshyn, Nicholas A.; Jensen, Philip J.; Maheras, Steven J.

2014-09-29T23:59:59.000Z

126

Development and testing of a low-maintenance, energy-absorbing bridge rail  

E-Print Network [OSTI]

vehicle leaves the flow of traffic and strikes a bridge rail. The second concern is for the safety of the maintenance workers who must repair bridge rail damage following a collision. Third, the increasing cost of maintaining br idge decks and rails... during a more severe collision. Furthermore, the new bridge rail is designed to fit either new or existing standard bridge decks. Following development of the new bridge rail, two full-scale vehicle crash-tests were performed at the TTI Research...

Cain, John Craig

1985-01-01T23:59:59.000Z

127

River Corridor Project Workplace Air Monitoring Technical Basis  

SciTech Connect (OSTI)

This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization.

MANTOOTH, D.S.

2001-01-17T23:59:59.000Z

128

High Speed Rail in Greece : methods for evaluating economic impacts  

E-Print Network [OSTI]

High Speed Rail is a mode that gains popularity every day. Many countries have such a network and others are on the way to adopting one. Greece, which is part of the European Union, is one of those countries that are looking ...

Radopoulou, Stefania Christina

2010-01-01T23:59:59.000Z

129

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan  

E-Print Network [OSTI]

and transit connections 路! Positive return on investment, 1.5-2.5 times more than cost 路! Bridge, bottleneck for rail investment creates a unique opportunity 路! Global and national economic and environmental trends are likely to increase fuel costs and impose controls on greenhouse gas emission 路! Therefore, Minnesota

Minnesota, University of

130

Rail assembly for use in a radioactive environment  

DOE Patents [OSTI]

An improved rail assembly and method of construction thereof is disclosed herein that is particularly adapted for use with a crane trolley in a hot cell environment which is exposed to airborne and liquidborne radioactive contaminants. The rail assembly is generally comprised of a support wall having an elongated, rail-housing recess having a floor, side wall and ceiling. The floor of the recess is defined at least in part by the load-bearing surface of a rail, and is substantially flat, level and crevice-free to facilitate the drainage of liquids out of the recess. The ceiling of the recess overhangs and thereby captures trolley wheels within the recess to prevent them from becoming dislodged from the recess during a seismic disturbance. Finally, the interior of the recess includes a power track having a slot for receiving a sliding electrical connector from the crane trolley. The power track is mounted in an upper corner of the recess with its connector-receiving groove oriented downwardly to facilitate the drainage of liquidborne contaminants and to discourage the collection of airborne contaminants within the track.

Watts, Ralph E. (Harrison, OH)

1989-01-01T23:59:59.000Z

131

Commuter Choice Program Rail/Vanpool Reimbursement Form  

E-Print Network [OSTI]

workdays to meet program eligibility. Eligible non-permit holders receive 100% reimbursement (max $120); eligible permit holders receive 25% reimbursement (max $30) You will receive your reimbursement check CHANGES FROM THE PRIOR MONTH (ADDRESS, WORK LOCATION, WORK HRS, PERMIT PURCHASE/TURNED IN) COST OF RAIL

de Lijser, Peter

132

Tradeoff between Efficiency and Melting for a High-Performance Electromagnetic Rail Gun  

E-Print Network [OSTI]

We estimate the temperature distribution in the rails of an electromagnetic rail gun (EMG) due to the confinement of the current in a narrow surface layer resulting from the skin effect. In order to obtain analytic results, we assume a simple geometry for the rails, an electromagnetic skin effect boundary edge that propagates with the accelerating armature, and a current carrying channel controlled by magnetic field diffusion into the rails. We compute the temperature distribution in the rails at the time that the armature leaves the rails. For the range of exit velocities, from 1500 m/s to 5000 m/s, we find the highest temperatures are near the gun breech. After a single gun firing, the temperature reaches the melting temperature of the metal rails in a layer of finite thickness near the surface of the rails, for rails made of copper or tantalum. We plot the thickness of the melt layer as a function of position along the rails. In all cases, the thickness of the melt layer increases with gun velocity, making damage to the gun rails more likely at higher velocity. We also calculate the efficiency of the EMG as a function of gun velocity and find that the efficiency increases with increasing velocity, but only if the length of the gun is sufficiently long. The thickness of the melted layer also decreases with increasing rail length. Therefore, there is a tradeoff: for rails of sufficient length, the gun efficiency increases with increasing velocity but the melted layer thickness in the rails also increases.

William C. McCorkle; Thomas B. Bahder

2010-08-11T23:59:59.000Z

133

Beyond Corridor Reliability Measures: Analysis of Freeway Travel Time Reliability at the1 Segment Level for Hotspot Identification2  

E-Print Network [OSTI]

Beyond Corridor Reliability Measures: Analysis of Freeway Travel Time Reliability at the1 Segment and particularly1 freeways. However, it has become evident that travel time reliability, taking into account at the directional corridor level for planning4 purposes and analyze the ways in which travel time reliability can

Bertini, Robert L.

134

The politics of Peacekeeper Rail Garrison. Doctoral thesis  

SciTech Connect (OSTI)

In 1985, the Congress capped at 50 the number of Peacekeeper ICBMs that could be deployed in vulnerable Minuteman silos, thereby sending the Reagan administration and the Air Force in search of another basing mode so that 100 of the ton-warhead missiles could be deployed as recommended by the Scowcroft Commission. The result was Peacekeeper rail garrison--a strategic nuclear weapon system that combined the Peacekeeper missile with railroad trains garrisoned at military installations. The missile trains would have dispersed across the nation's railways only during times of 'national need like the Cuban Missile Crisis. This case study examines the politics of that weapon system in order to contribute to the literature regarding weapons acquisition, test a number of propositions suggested by the bureaucratic politics model, and assess the influence of nonbureaucratic forces and actors on Peacekeeper rail garrison's fortunes.

Van Tassel, A.R.

1992-01-01T23:59:59.000Z

135

Theory of SEI Formation in Rechargeable Batteries: Capacity Fade, Accelerated Aging and Lifetime Prediction  

E-Print Network [OSTI]

Cycle life is critically important in applications of rechargeable batteries, but lifetime prediction is mostly based on empirical trends, rather than mathematical models. In practical lithium-ion batteries, capacity fade occurs over thousands of cycles, limited by slow electrochemical processes, such as the formation of a solid-electrolyte interphase (SEI) in the negative electrode, which compete with reversible lithium intercalation. Focusing on SEI growth as the canonical degradation mechanism, we show that a simple single-particle model can accurately explain experimentally observed capacity fade in commercial cells with graphite anodes, and predict future fade based on limited accelerated aging data for short times and elevated temperatures. The theory is extended to porous electrodes, predicting that SEI growth is essentially homogeneous throughout the electrode, even at high rates. The lifetime distribution for a sample of batteries is found to be consistent with Gaussian statistics, as predicted by th...

Pinson, Matthew B

2012-01-01T23:59:59.000Z

136

E-Print Network 3.0 - area southern rail Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

proximity to a light-rail station affects ... Source: Levinson, David M. - Department of Civil Engineering, University of Minnesota Collection: Engineering 2 Reprinted from...

137

Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits  

E-Print Network [OSTI]

D.C. , 1994; Booz Allen Hamilton, Inc. Light rail transitD.C. , 2003; Booz Allen Hamilton, Inc. , Managing Capital

Guerra, Erick

2010-01-01T23:59:59.000Z

138

Promoting technological investment in the Australian rail freight sector: evaluating the feasibility of accelerated depreciation.  

E-Print Network [OSTI]

??Although regulation for emissions, pollution, etc., is becoming stricter, the Australian rail freight industry is still locked in to using large numbers of existing rolling (more)

Koowattanatianchai, Nattawoot

2011-01-01T23:59:59.000Z

139

Plant community structure and soil properties along stream corridors of cranberry bogs since discontinuation of agriculture.  

E-Print Network [OSTI]

Plant community structure and soil properties along stream corridors of cranberry bogs since Laboratory 7 MBL Street Woods Hole, Massachusetts 02543 #12;Poole 1 Abstract Many cranberry bogs in Cape Cod area along the sides of rivers which run through cranberry bogs. The main site of my study was along

Vallino, Joseph J.

140

Dynamically Predicting Corridor Travel Time Under Incident Conditions Using a Neural Network Approach  

E-Print Network [OSTI]

into the ANN model development, despite that incident might be a major source of prediction degradations. Additionally, directly deriving corridor travel times in a one-step manner raises some intractable problems, such as pairing input-target data, which have...

Zeng, Xiaosi

2011-02-22T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors  

Broader source: Energy.gov [DOE]

The Department has decided that, prior to issuing a report that designates any national interest electric transmission corridor, the Department will first issue any designation that it is considering in draft form, so as to allow additional opportunities for review and comment by affected States, regional entities, and the general public.

142

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors  

E-Print Network [OSTI]

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors M. Kuehnhausen. It is built as a Service Oriented Architecture (SOA) using open web service specifications and Open Geospatial and the fundamental ideas behind a Service Oriented Architecture are explained in detail. The system was evaluated

Kansas, University of

143

Urban/industrial pollution for the New York CityWashington, D. C., corridor, 19961998  

E-Print Network [OSTI]

and Structure: Pollution--urban and regional (0305); 0365 Atmospheric Composition and Structure: TroposphereUrban/industrial pollution for the New York City颅Washington, D. C., corridor, 1996颅1998: 2. A study and Diagnostics Laboratory, National Oceanic and Atmospheric Administration, Boulder, Colorado, USA Received 11

144

Lessons Learned during Creation of the I-65 Biofuels Corridor (White Paper)  

SciTech Connect (OSTI)

A team of Clean Cities coalitions and state agencies worked together to create a biofuels corridor along I-65 between Indiana and Alabama. The team built relationships with stakeholders and learned the value of strong partnerships, good communication, marketing, and preparation.

Not Available

2009-06-01T23:59:59.000Z

145

Validating Predicted Rural Corridor Travel Times from an Automated License Plate Recognition System: Oregon's Frontier Project  

E-Print Network [OSTI]

: Oregon's Frontier Project Robert L. Bertini Department of Civil & Environmental Engineering Portland of a corridor travel time prediction system that uses automated license plate recognition颅the Frontier Travel Time project. As part of the Frontier project, the Oregon Department of Transportation deployed a video

Bertini, Robert L.

146

Port competition and network polarization at the East Asian maritime corridor  

E-Print Network [OSTI]

1 Port competition and network polarization at the East Asian maritime corridor This paper Korea Maritime Institute (KMI) Logistics and Port Research Department Sangam-dong, Mapo-gu Seoul, Korea author halshs-00558856,version1-24Jan2011 #12;2 Port competition and network polarization at the East

Boyer, Edmond

147

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los Angeles  

E-Print Network [OSTI]

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los or organization) Volvo Research and Educational Foundation- $79,604.00 Total Project Cost $79,604.00 Agency ID of Research Project This project will develop models to optimize the balance of freight demand across rail

California at Davis, University of

148

Rail Focused US DOTRITA Tier I University Transportation Center University of Illinois at Urbana-Champaign  

E-Print Network [OSTI]

.S. freight railroad system is one of the transportation success stories of the latter 20th and early 21st is a seven- university consortium led by the Rail Transportation and Engineering Center (Rail Engineering at UIUC. Christopher Barkan Center Director Conrad Ruppert, Jr. Associate Director for Research

Entekhabi, Dara

149

Photoinduced electron transfer from rail to rung within a self-assembled oligomeric porphyrin ladderw  

E-Print Network [OSTI]

from an oligomer (rail) to the center of a terminal tetrazine (rung), with the remaining hole being-pyridyl-1,2,4,5-tetrazine, DPT). The studies employed absorption, fluorescence, transient absorption-linked porphyrin trimers (rails) and tetrazine species (rungs) are the electron donors and acceptors, respectively

150

Photoinduced electron transfer from rail to rung within a self-assembled oligomeric porphyrin ladder  

SciTech Connect (OSTI)

Photoinduced electron transfer in a self-assembled supramolecular ladder structure comprising oligomeric porphyrin rails and ligated dipyridyltetrazine rungs was characterized by transient absorption spectroscopy and transient direct current photoconductivity to be mainly from an oligomer (rail) to the center of a terminal tetrazine (rung), with the remaining hole being delocalized on the oligomer and subsequent charge recombination in 0.19 ns.

She, Chunxing; Lee, Suk Joong; McGarrah, James E.; Vura-Weis, Josh; Wasielewski, Michael; Chen, Hanning; Schatz, George C.; Ratner, Mark A.; Hupp, Joseph T.

2010-01-01T23:59:59.000Z

151

Combining rails and anchors with laser forcing for selective manipulation within 2D droplet arrays  

E-Print Network [OSTI]

demonstrate the combination of a rails and anchors microfluidic system with laser forcing to enable to anchor holes made in the base of a microfluidic channel, enabling the creation of arrays their merging and a chemical reaction to take place. Finally by adding guiding rails within the microfluidic

Boyer, Edmond

152

Continuous flow multi-stage microfluidic reactors via hydrodynamic microparticle railing{  

E-Print Network [OSTI]

Continuous flow multi-stage microfluidic reactors via hydrodynamic microparticle railing{ Ryan D-at-a-time). Microfluidic processors that enable multi-stage fluidic reactions with suspended microparticles (e-on-a-chip technologies. Here we present a single-layer microfluidic reactor that utilizes a microfluidic railing

Lin, Liwei

153

1 Copyright 2014 by ASME Proceedings of the 2014 Joint Rail Conference  

E-Print Network [OSTI]

. These operators report energy consumption in purchased electricity (kWh) instead of gallons of liquid fuel transportation alternative to reduce energy consumption and emissions in large urban areas. Use of commuter rail-term efficiency trends for rail as an urban transportation mode, this study analyzes historic trends in energy

Barkan, Christopher P.L.

154

Rail Coal Transportation Rates to the Electric Power Sector  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S.30 2013 Macroeconomicper8,170Thousand2.442 3.028 3.803 3.971Feet)06CoalRail

155

TEC Working Group Topic Groups Rail | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational EnergyCommitteeRenewable Energy, U.S.ArbitraryTask6ManualRail TEC

156

Design for the Frail Old: Environmental and Perceptual Influences on Corridor Walking Behaviors of Assisted Living Residents  

E-Print Network [OSTI]

living among these residents and yet, there is little research that has been done in this regard. The researcher conducted two studies in Central Texas to explore how corridor design features influenced indoor walking behaviors among assisted living...

Lu, Zhipeng

2010-10-12T23:59:59.000Z

157

An Analysis of the health impacts from PM and NOx emissions resulting from train operations in the Alameda Corridor, CA  

E-Print Network [OSTI]

2009). Estimating PM and NOx Train Emissions in the AlamedaAuthority. Number of Trains Running on the Alameda Corridor.x emissions resulting from train operations in the Alameda

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ogunseitan, Oladele; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2010-01-01T23:59:59.000Z

158

Evaluation of a nodal capacity restricted dynamic model for the Southwest Freeway (US-59) corridor in Houston, Texas  

E-Print Network [OSTI]

EVALUATION OF A NODAL CAPACITY RESTRICTED DYNAMIC MODEL FOR THE SOUTHWEST FREEWAY (US-59) CORRIDOR IN HOUSTON, TEXAS A Thesis by PALATHINKAL MANU ISAAC Submitted to the Office of Graduate Studies of Texas ARM University in partial... fulfillment of the requirements for the degree of MASTER OF SCIENCE August 1994 Major Subject Civil Engineering EVALUATION OF A NODAL CAPACITY RESTRICTED DYNAMIC MODEL FOR THE SOUTHWEST FREEWAY (US-59) CORRIDOR IN HOUSTON, TEXAS A Thesis...

Isaac, Palathinkal Manu

1994-01-01T23:59:59.000Z

159

Road-corridor planning in the EIA procedure in Spain. A review of case studies  

SciTech Connect (OSTI)

The assessment of different alternatives in road-corridor planning must be based on a number of well-defined territorial variables that serve as decision making criteria, and this requires a high-quality preliminary environmental assessment study. In Spain the formal specifications for the technical requirements stipulate the constraints that must be considered in the early stages of defining road corridors, but not how they should be analyzed and ranked. As part of the feasibility study of a new road definition, the most common methodology is to establish different levels of Territorial Carrying Capacity (TCC) in the study area in order to summarize the territorial variables on thematic maps and to ease the tracing process of road-corridor layout alternatives. This paper explores the variables used in 22 road-construction projects conducted by the Ministry of Public Works that were subject to the Spanish EIA regulation and published between 2006 and 2008. The aim was to evaluate the quality of the methods applied and the homogeneity and suitability of the variables used for defining the TCC. The variables were clustered into physical, environmental, land-use and cultural constraints for the purpose of comparing the TCC values assigned in the studies reviewed. We found the average quality of the studies to be generally acceptable in terms of the justification of the methodology, the weighting and classification of the variables, and the creation of a synthesis map. Nevertheless, the methods for assessing the TCC are not sufficiently standardized; there is a lack of uniformity in the cartographic information sources and methodologies for the TCC valuation. -- Highlights: We explore 22 road-corridor planning studies subjected to the Spanish EIA regulation. We analyze the variables selected for defining territorial carrying capacity. The quality of the studies is acceptable (methodology, variable weighting, mapping). There is heterogeneity in the methods for territorial carrying capacity valuation.

Loro, Manuel, E-mail: manuel.loro@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Polit閏nica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain) [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Polit閏nica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Polit閏nica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigaci髇 del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Polit閏nica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Arce, Rosa M., E-mail: rosa.arce.ruiz@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Polit閏nica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Polit閏nica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigaci髇 del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Polit閏nica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Ortega, Emilio, E-mail: e.ortega@upm.es [Transport Research Centre (TRANSyT-UPM) Universidad Polit閏nica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain) [Transport Research Centre (TRANSyT-UPM) Universidad Polit閏nica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigaci髇 del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Polit閏nica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Department of Construction and Rural Roads, Forestry Engineering School, Universidad Polit閏nica de Madrid, Ciudad Universitaria s/n, 28040 Madrid (Spain); and others

2014-01-15T23:59:59.000Z

160

Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities  

SciTech Connect (OSTI)

The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

Mindy Kirkpatrick

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Effect of Rail Rate Deregulation: The Case of Wheat Exports from the South Plains.  

E-Print Network [OSTI]

. ....................................... 4 Effect of Rail Rate Deregulation: The Case of Wheat Exports from the South Plains Stephen Fuller and C.V. Shanmugham" a INTRODUCTION Agriculture is an important user of rail services for shipping products to market and for moving produc...- tion supplies to rural communities. The l e d and structure of rail rates affect returns to farmers as well as farmers' competitive positions in distant markets. Farm products tend to be buIky and heavy reIative to their value; accordingly...

Fuller, Stephen; Shanmugham, C.V

1982-01-01T23:59:59.000Z

162

Steering system for a train of rail-less vehicles  

DOE Patents [OSTI]

A steering system for use with a multiple vehicle train permits tracking without rails of one vehicle after another. This system is particularly useful for moving conveyor systems into and out of curved paths of room and pillar underground mine installations. The steering system features an elongated steering bar pivotally connected to each of adjacent vehicles at end portions of the bar permitting angular orientation of each vehicle in respect to the steering bar and other vehicles. Each end portion of the steering bar is linked to the near pair of vehicle wheels through wheel yoke pivot arms about king pin type pivots. Movement of the steering bar about its pivotal connection provides proportional turning of the wheels to effect steering and tracking of one vehicle following another in both forward and reverse directions.

Voight, Edward T. (Worthington, OH)

1983-01-01T23:59:59.000Z

163

The Effect of Light Rail Transit on Employment: A Case Study of Dallas, Texas  

E-Print Network [OSTI]

in the area. This can help attract more jobs into the central city, while potentially increasing the employment opportunities for low income residents. This study aims to investigate whether proximity to light rail transit influence total employment...

Mendez, Joel

2014-08-05T23:59:59.000Z

164

Rails-to-trails Conversions in Oklahoma: Politics, Practices and Future.  

E-Print Network [OSTI]

??This study was designed to review the historical issues associated with the State of Oklahoma and the development of a long distance rail-to-trail conversion during (more)

Cowan, Jerel Lee

2009-01-01T23:59:59.000Z

165

Low cost monitoring system to diagnose problematic rail bed : case study of Mud Pumping Site  

E-Print Network [OSTI]

This thesis describes the development of low cost sensors and wireless sensor network (WSN) platform aimed at characterizing problematic rail beds (subgrade). The instrumentations are installed at a busy high-speed Northeast ...

Aw, Eng Sew, 1978-

2007-01-01T23:59:59.000Z

166

Shaping time light and movement : a modern rail station for Boston  

E-Print Network [OSTI]

After a century of neglect, due to investment in worldwide road construction and enlargements of airports, there is a renewed incentive to revive rail travel within the continental US. This motivation is derived from both ...

Lin, Juintow, 1973-

2000-01-01T23:59:59.000Z

167

Cost-effectiveness of freeway median high occupancy vehicle (HOV) facility conversion to rail guideway transit  

E-Print Network [OSTI]

Many freeways in the United States contain median high occupancy vehicle (HOV) facilities. These facilities have been envisioned by some as reserved space for future rail guideway transit. This thesis examines the cost-effectiveness of converting a...

Best, Matthew Evans

1996-01-01T23:59:59.000Z

168

Determination of applied stresses in rails using the acoustoelastic effect of ultrasonic waves  

E-Print Network [OSTI]

This research develops a procedure to determine the applied stresses in rails using the acoustoelastic effect of ultrasonic waves. Acoustoelasticity is defined as the stress dependency of ultrasonic wave speed or wave polarization. Analytical models...

Gokhale, Shailesh Ashok

2008-10-10T23:59:59.000Z

169

Determination of applied stresses in rails using the acoustoelastic effect of ultrasonic waves  

E-Print Network [OSTI]

This research develops a procedure to determine the applied stresses in rails using the acoustoelastic effect of ultrasonic waves. Acoustoelasticity is defined as the stress dependency of ultrasonic wave speed or wave polarization. Analytical models...

Gokhale, Shailesh Ashok

2009-05-15T23:59:59.000Z

170

Cooled electronic system with thermal spreaders coupling electronics cards to cold rails  

DOE Patents [OSTI]

Liquid-cooled electronic systems are provided which include an electronic assembly having an electronics card and a socket with a latch at one end. The latch facilitates securing of the card within the socket or removal of the card from the socket. A liquid-cooled cold rail is disposed at the one end of the socket, and a thermal spreader couples the electronics card to the cold rail. The thermal spreader includes first and second thermal transfer plates coupled to first and second surfaces on opposite sides of the card, and thermally conductive extensions extending from end edges of the plates, which couple the respective transfer plates to the liquid-cooled cold rail. The thermally conductive extensions are disposed to the sides of the latch, and the card is securable within or removable from the socket using the latch without removing the cold rail or the thermal spreader.

Chainer, Timothy J; Gaynes, Michael A; Graybill, David P; Iyengar, Madhusudan K; Kamath, Vinod; Kochuparambil, Bejoy J; Schmidt, Roger R; Schultz, Mark D; Simco, Daniel P; Steinke, Mark E

2013-07-23T23:59:59.000Z

171

Contracting Rail Freight Services for Country Elevators in the Texas Panhandle.  

E-Print Network [OSTI]

rooe ZTA245.7 B873 r\\O. 1473 -.-_ LIBRARY B-1473 JUDe 1984 JUL 27 1984 Co Rail Freight Services for Country Elevators in the Texas Panhandle The Texas Agricultural Experiment Station, Neville P. Clarke, Director, The Texas A&M University... ............................................................... 14 ACKNOWLEDGEMENTS ........................................................... 14 CONTRACTING RAIL FREIGHT-SERVICES FOR COUNTRY ELEVATORS IN THE TEXAS PANHANDLE Stephen Fuller Department of Agricultural Economics Texas Agricultural Experiment...

Fuller, Stephen

1984-01-01T23:59:59.000Z

172

Effectiveness of bomber deployed autonomous airborne vehicles in finding rail mobile SS-24s  

SciTech Connect (OSTI)

Computer simulation predictions of the effectiveness of autonomous airborne vehicles in finding rail mobile SS-24s are presented. Effectiveness is discussed for several autonomous airborne vehicle endurances and survivabilities for the search area southwest of Moscow. The effect of where the Soviets place the SS-24s on the rail network was also investigated. The simulation predicts significant variations in the ability of a multi-autonomous airborne vehicle system to find SS-24s with these parameters. 12 figs., 1 tab.

Abey, A.E.; Erickson, S.A.; Norquist, P.D.

1990-08-01T23:59:59.000Z

173

Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409  

SciTech Connect (OSTI)

The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and to evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides; these radionuclides either would have decayed and would be undetectable in soil, or likely would not have deposited onto Hanford Site soils. A small fraction of the total historical emissions consisted of long-lived particulate radionuclides, which could have deposited onto the soil. Soil monitoring studies conducted as part of surveillance and monitoring programs do not indicate a build-up of radionuclide concentrations in soil, which might indicate potential deposition impacts from stack emissions. Aerial radiological surveys of the Hanford Site, while effective in detecting gamma-emitting nuclides, also do not indicate deposition patterns in soil from stack emissions. - The surveillance and monitoring programs also have verified that the limited occurrence of biointrusion observed in the River Corridor has not resulted in a spread of contamination into the non-operational areas. - Monitoring of radionuclides in ambient air conducted as part of the surveillance and monitoring programs generally show a low and declining trend of detected concentrations in air. Monitoring of radionuclides in soil and vegetation correspondingly show declining trends in concentrations, particularly for nuclides with short half lives (Cs-137, Co-60 and Sr-90). - Statistical analysis of the geographical distribution of waste sites based on man -made features and topography describes the likely locations of waste sites in the River Corridor. The results from this analysis reinforce the findings from the Orphan Site Evaluation program, which has systematically identified any remaining waste sites within the River Corridor. - Statistical analysis of the distribution of radionuclide concentrations observable from aerial surveys has confirmed that the likelihood of detecting elevated radionuclide concentrations in non-operational area soils is very small; the occurrences and locations where potentially elevated concentrations may be found are discussed below. In

Lowe, John [CH2M HILL, Richland, Washington 99354 (United States); Aly, Alaa [CH2M HILL Plateau Remediation Company and INTERA Incorporated, Richland, Washington 99354 (United States)

2012-07-01T23:59:59.000Z

174

EIS-0369: Notice of Public Comment Period Extension and Additional...  

Broader source: Energy.gov (indexed) [DOE]

Notice of Public Comment Period Extension and Additional Public Meeting Supplemental Yucca Mountain Rail Corridor and Rail Alignment The Department of Energy is now announcing...

175

Current Status and Potential Impacts Regarding the Proposed Development of a Rail Line to the Yucca Mountain Nuclear Waste Repository  

SciTech Connect (OSTI)

This paper provides a description of the current status regarding the proposed development of a rail line to the Yucca Mountain Nuclear Waste Repository in Nye County, Southern Nevada, which includes potential impacts analyzed during the National Environmental Policy Act (NEPA) process, and the subsequent creation of an Environmental Impact Statement (EIS) for the rail line. Potential impacts are addressed within the context of impacts to natural and human environmental resources found within the geographic area of the proposed federal project. Potential impacts to these resources have been fully analyzed in the Rail Alignment Draft EIS (DEIS). This paper includes a summary of the potential impacts analyzed in the DEIS. Examples of potential impacts include land use conflicts, air quality, water use, and impacts to biological and cultural resources, among others. In conclusion: Based on its obligations under the NWPA and its decision to select the mostly rail scenario for the transportation of spent nuclear fuel and high-level radioactive waste, DOE needs to ship these materials by rail in Nevada to a repository at Yucca Mountain. DOE prepared the Rail Alignment EIS to provide the background, data, information, and analyses to help decision makers and the public understand the potential environmental impacts that could result from constructing and operating a railroad for shipment of spent nuclear fuel, high-level radioactive waste, and other materials from an existing rail line in Nevada to a repository at Yucca Mountain. This railroad would consist of a rail line, railroad operations support facilities, and other related infrastructure. DOE will use the Rail Alignment EIS to decide whether to construct and operate the proposed railroad, and if so, to: - Select a rail alignment (Caliente rail alignment or Mina rail alignment) in which to construct the railroad; - Select the common segments and alternative segments within either a Caliente rail alignment or a Mina rail alignment. The Department would use the selected common segments and alternative segments to identify the public lands to be included in right-of-way applications; - Decide where to construct proposed railroad operations support facilities; - Decide whether to restrict use of the rail line to DOE trains, or whether to allow commercial shippers to operate over the rail line; and - Determine what mitigation measures to implement. (authors)

Lanthrum, G. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Gunnerson, J. [Booz Allen Hamilton, Las Vegas, NV (United States)

2008-07-01T23:59:59.000Z

176

Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)  

SciTech Connect (OSTI)

Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

Not Available

1993-03-01T23:59:59.000Z

177

NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion  

SciTech Connect (OSTI)

An interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top-level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of safety functional requirements. In addition, the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed. 9 refs.

Marshall, A.C.; Sawyer, J.C. Jr.; Bari, R.A.; Brown, N.W.; Cullingford, H.S.; Hardy, A.C.; Lee, J.H.; Mcculloch, W.H.; Niederauer, G.F.; Remp, K. (Sandia National Laboratories, Albuquerque, NM (United States) NASA, Washington (United States) Brookhaven National Laboratory, Upton, NY (United States) General Electric Co., San Jose, CA (United States) NASA, Johnson Space Center, Houston, Tn (United States) L

1992-07-01T23:59:59.000Z

178

NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion  

SciTech Connect (OSTI)

An Interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top- level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed.

Marshall, A.C.; Lee, J.H.; McCulloch, W.H. (Sandia National Labs., Albuquerque, NM (United States)); Sawyer, J.C. Jr. (National Aeronautics and Space Administration, Washington, DC (United States)); Bari, R.A. (Brookhaven National Lab., Upton, NY (United States)); Brown, N.W. (General Electric Co., San Jose, CA (United States)); Cullingford, H.S.; Hardy, A.C. (National Aeronautics and Space Administ

1992-01-01T23:59:59.000Z

179

NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion  

SciTech Connect (OSTI)

An Interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top- level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed.

Marshall, A.C.; Lee, J.H.; McCulloch, W.H. [Sandia National Labs., Albuquerque, NM (United States); Sawyer, J.C. Jr. [National Aeronautics and Space Administration, Washington, DC (United States); Bari, R.A. [Brookhaven National Lab., Upton, NY (United States); Brown, N.W. [General Electric Co., San Jose, CA (United States); Cullingford, H.S.; Hardy, A.C. [National Aeronautics and Space Administration, Houston, TX (United States). Lyndon B. Johnson Space Center; Niederauer, G.F. [Los Alamos National Lab., NM (United States); Remp, K. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Rice, J.W. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Sholtis, J.A. [Department of the Air Force, Kirtland AFB, NM (United States)

1992-09-01T23:59:59.000Z

180

Comparison of vehicle travel times and measurement techniques along the I-35 corridor in San Antonio, Texas  

E-Print Network [OSTI]

collected for three days and compared to travel times derived from loop detector data along the 1-35 corridor in San Antonio, Texas. The loop detector data were made available through TransGuide's Internet site. TransGuide is the traffic management center...

Ferrier, Pete James

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Contribution of Degraded Modes of Operation to Accidents in the US, UK and Australian Rail Industries  

E-Print Network [OSTI]

The Contribution of Degraded Modes of Operation to Accidents in the US, UK and Australian Rail, operators develop `work arounds' that help them to cope with these degraded modes. This has led to a culture with the safety culture in rail operati

Johnson, Chris

182

The impact of high-speed rail and low-cost carriers on European air passenger traffic  

E-Print Network [OSTI]

The impact of high-speed rail and low-cost carriers on European air passenger traffic Regina R, and market characteristics on air traffic; and 2) the impact of high-speed rail and low-cost in system-wide air travel demand, whereas the expansion of low-cost carriers has led to a significant

Gummadi, Ramakrishna

183

Moisture-Driven Deterioration and Abrasion of Concrete Sleeper Rail Seats Submitted for publication in the proceedings of the  

E-Print Network [OSTI]

in the proceedings of the 9th World Congress on Railway Research 1 February 2011 John C. Zeman1 , Ryan G. Kernes2 , J and Environmental Engineering University of Illinois at Urbana-Champaign 205 N. Mathews Ave., Urbana, IL 61801 Fax is the degradation of the concrete underneath the rail and results in problems such as wide gauge, insufficient rail

Barkan, Christopher P.L.

184

Challenges of Including the Mina Route in the Nevada Rail Alignment Environmental Impact Statement  

SciTech Connect (OSTI)

The Department of Energy's Office of Civilian Radioactive Waste Management is developing the Yucca Mountain repository for the disposition of spent nuclear fuel (SNF) and high level radioactive waste (HLW). Part of that development is the transportation infrastructure needed to ship SNF and HLW from 77 sites around the country to the repository. A Record of Decision was issued in 2004 to use mostly rail as the mode of transport both nationally, and in the State of Nevada. No rail access exists to the Yucca Mountain site, so a Rail Alignment Environmental Impact Statement (RA-EIS) is being prepared to address the impacts associated with connecting existing track in Nevada to Yucca Mountain. Late in the preparation of the Draft RA-EIS, an option to consider an additional alignment alternative was introduced. This paper describes the consideration given to the new alternative and describes how it is being incorporated into the RA-EIS. (authors)

Lanthrum, G.; Larson, N. [U.S. Department of Energy, Office of Civilian Radioactive Waste, Washington, DC (United States); Mussler, R. [Booze Allen Hamilton, Suite (United States)

2007-07-01T23:59:59.000Z

185

Analysis of the D0 Crane Rail as a Support for a Horizontal Lifeline  

SciTech Connect (OSTI)

The D-Zero crane rail is analyzed for use as an anchor support for a one person Horizon{trademark} Horizontal Lifeline system that will span the pit area at D-Zero assembly hall. The lifeline will span 75 ft across the pit area, will be located out of the travel of the crane and above the concrete lentil wall. The crane rail is a suitable anchor for a one person Horizon TM Horizontal Lifeline system. The expected stress on the rail is 1,995 psi which has a factor of safety of 5.5 on the allowable stress. The anchor position is located 18 feet away from the concrete lentil wall and out of the travel of the overhead crane.

Cease, H.; /Fermilab

2000-03-02T23:59:59.000Z

186

Corridor Information Corridor Length (miles)  

E-Print Network [OSTI]

Expy/I-290 WB I-290 WB Stevenson Expy/I-55 NB S Ashland Ave/Exit 28B I-88/Exit 15A US-20/US-45/US-12

187

Ionic Liquid-Enhanced Solid State Electrolyte Interface (SEI) for Lithium Sulfur Batteries  

SciTech Connect (OSTI)

Li-S battery is a complicated system with many challenges existing before its final market penetration. While most of the reported work for Li-S batteries is focused on the cathode design, we demonstrate in this work that the anode consumption accelerated by corrosive polysulfide solution also critically determines the Li-S cell performance. To validate this hypothesis, ionic liquid (IL) N-methyl-N-butylpyrrolidinium bis(trifluoromethylsulfonyl)imide (Py14TFSI) has been employed to modify the properties of SEI layer formed on Li metal surface in Li-S batteries. It is found that the IL-enhanced passivation film on the lithium anode surface exhibits much different morphology and chemical compositions, effectively protecting lithium metal from continuous attack by soluble polysulfides. Therefore, both cell impedance and the irreversible consumption of polysulfides on lithium metal are reduced. As a result, the Coulombic efficiency and the cycling stability of Li-S batteries have been greatly improved. After 120 cycles, Li-S battery cycled in the electrolyte containing IL demonstrates a high capacity retention of 94.3% at 0.1 C rate. These results unveil another important failure mechanism for Li-S batteries and shin the light on the new approaches to improve Li-S battery performances.

Zheng, Jianming; Gu, Meng; Chen, Honghao; Meduri, Praveen; Engelhard, Mark H.; Zhang, Jiguang; Liu, Jun; Xiao, Jie

2013-05-16T23:59:59.000Z

188

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425  

SciTech Connect (OSTI)

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

2012-07-01T23:59:59.000Z

189

Did "Pookie" get a green-collar job? : a critical case study on the East Bay Green Corridor's employment goals, activities, and impacts  

E-Print Network [OSTI]

This thesis describes the formation of the East Bay Green Corridor (EBGC), a multi-city partnership for green investment in California, and how it failed to create stable, living wage economic opportunities for those with ...

Miller, Matthew J. (Matthew Jordan)

2014-01-01T23:59:59.000Z

190

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).  

SciTech Connect (OSTI)

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridor

Krummel, J.; Hlohowskyj, I.; Kuiper, J.; Kolpa, R.; Moore, R.; May, J.; VanKuiken, J.C.; Kavicky, J.A.; McLamore, M.R.; Shamsuddin, S. (Decision and Information Sciences); ( EVS)

2011-09-01T23:59:59.000Z

191

CALCULATIONS OF FIRE SMOKE BEHAVIOUR IN LONG RAIL TUNNELS S. DARON, E. RUFFIN  

E-Print Network [OSTI]

2000-13 CALCULATIONS OF FIRE SMOKE BEHAVIOUR IN LONG RAIL TUNNELS S. DA?RON, E. RUFFIN INERIS Parc in complex underground networks, we want to implement a coupling between a ID ventilation code and a CFD model or a zone model. The project consists in 3 main steps: the development of a ID ventilation code

Paris-Sud XI, Universit茅 de

192

Hydraulic Mechanisms of the Deterioration of Concrete Sleeper Rail Seats , R. Kernes  

E-Print Network [OSTI]

Hydraulic Mechanisms of the Deterioration of Concrete Sleeper Rail Seats J. Zeman 2 , R. Kernes 1 to have five potential mechanisms, and this research investigates three of them: hydraulic pressure cracking, hydro-abrasive erosion, and abrasion. In order to investigate the two hydraulic-driven mechanisms

Barkan, Christopher P.L.

193

Evaluation of sight distance as a criterion for prioritizing rail-highway intersections in Texas  

E-Print Network [OSTI]

for its effects on the overall ranking of the rail-highway intersections. A state hazard index was chosen from a state-of-the-practice review with which to compare the current and revised Texas Priority Indices. Finally, the effectiveness of each...

Pecheux, Kelley Klaver

2012-06-07T23:59:59.000Z

194

Simulating calculations and optimization design of a new HVDC supply power for light rail system  

E-Print Network [OSTI]

such a complex system, taking into account vehicle motion and HVDC electrical distribution. Then, an optimizationSimulating calculations and optimization design of a new HVDC supply power for light rail system R茅mi Vial, Delphine Riu, Nicolas Reti猫re Grenoble Electrical Engineering Laboratory, 38402 Saint

Boyer, Edmond

195

Rail costs and capital adjustments in a quasi-regulated environment  

E-Print Network [OSTI]

This paper reports on results obtained from estimation of a rail cost function using a pooled time-series cross section of Class I U.S. railroads for the period 1973-1986. Based on the results of this cost function, an ...

Friedlaender, Ann Fetter

1990-01-01T23:59:59.000Z

196

Christopher T. Rapp, Marcus S. Dersch, J. Riley Edwards 2013 Joint Rail Conference  

E-Print Network [OSTI]

of Experimentation 路 Testing Background 颅 Laboratory Experimentation 路 July 2012 Field Instrumentation 颅 TLV Based Tactile Surface Sensors (MBTSS) 路 Measure magnitude and distribution of pressure at the concrete of Concrete Crosstie Rail Seats MBTSS Testing Background 路 Proven feasibility for use on concrete crosstie

Barkan, Christopher P.L.

197

A GIS-Assisted Rail Construction Econometric Model that Incorporates LlDAR Data  

E-Print Network [OSTI]

A GIS-Assisted Rail Construction Econometric Model that Incorporates LlDAR Data David J. Cowen employed a raster GIS econometric routing model for the exploration of potential routes using construction in the grid-based econometric model was obtained from Light Detection and Ranging (LIDAR)data with accurate 0

Hodgson, Michael E.

198

An Econometrics Analysis of Freight Rail Demand Growth in Albert Wijeweera a, *  

E-Print Network [OSTI]

1 An Econometrics Analysis of Freight Rail Demand Growth in Australia Albert Wijeweera a, * , Hong of non-bulk freight demand in Australia. The paper uses a simple but robust econometrics method this growth at about four per cent per year (BTRE, 2006). The econometric model used herein enables us

199

Laser infrared photothermal radiometric depth profilometry of steels and its potential in rail track evaluation  

E-Print Network [OSTI]

-surface structures and damage in materials, well beyond the optical penetration depth of illu- mination sources, iLaser infrared photothermal radiometric depth profilometry of steels and its potential in rail and Manufacturing Ontario, 5 King's College Road, Toronto, Ont, Canada M5S 3G8 Abstract Laser Infrared Photothermal

Mandelis, Andreas

200

1 Copyright 2014 by ASME Proceedings of the 2014 Joint Rail Conference  

E-Print Network [OSTI]

1 Copyright 2014 by ASME Proceedings of the 2014 Joint Rail Conference JRC2014 April 2-4, 2014 the catenary to the power grid. This electrical power can be used by other trains in the same power section, regenerative energy cannot always be fully absorbed. When there is insufficient power demand from adjacent

Barkan, Christopher P.L.

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Proceedings of the 2013 Joint Rail Conference April 15-18, 2013, Knoxville, Tennessee, USA  

E-Print Network [OSTI]

American operating environment differs than the operating practices found throughout much of the rest freight and intercity passenger traffic. One of the challenges created by this operating environmentProceedings of the 2013 Joint Rail Conference JRC2013 April 15-18, 2013, Knoxville, Tennessee, USA

Barkan, Christopher P.L.

202

Structured hypothesis tests based diagnosis : application to a common rail diesel injection system  

E-Print Network [OSTI]

Structured hypothesis tests based diagnosis : application to a common rail diesel injection system Zahi SABEH, Jos茅 RAGOT, Fr茅d茅ric KRATZ Delphi Diesel Systems, Centre Technique de Blois 9 boulevard de to increase diesel engine performances and to reduce noise, emission and fuel consumption. Such goals

Boyer, Edmond

203

Proceedings of the ASME 2012 Joint Rail Conference April 17-19, 2012, Philadelphia, Pennsylvania, USA  

E-Print Network [OSTI]

Proceedings of the ASME 2012 Joint Rail Conference JRC2012 April 17-19, 2012, Philadelphia, and Debakanta Mishra3 Department of Civil and Environmental Engineering University of Illinois at Urbana characteristics, foundation type, ballast settlement from fouling and/or degradation, as well as fill and subgrade

204

Variable Spaced Grating (VSG) Snout, Rotator and Rails for use at LLE  

SciTech Connect (OSTI)

The Variable Spaced Grating (VSG) is a spectrometer snout mounted to an X-Ray Framing Camera (XRFC) through the Unimount flange. This equipment already exists and is used at the University of Rochester, Laboratory for Laser Energetics (LLE) facility. The XRFC and the Unimount flange are designed by LLE. The Tilt Rotator fixture that mounts next to the XRFC and the cart rails are designed by LLNL, and are included in this safety note. The other related components, such as the TIM rails and the Unimount flange, are addressed in a separate safety note, EDSN09-500005-AA. The Multipurpose Spectrometer (MSPEC) and VSG are mounted on the TIM Boat through the cart rails that are very similar in design. The tilt rotator combination with the Unimount flange is also a standard mounting procedure. The later mounting system has been included in this safety note. Figure-1 shows the interface components and the VSG snout. Figure-2 shows the VSG assembly mounted on the Unimount flange. The calibration pointer attachment is shown in place of the snout. There are two types of VSG, one made of 6061-T6 aluminum, weighing approximately 3 pounds, and the other made of 304 stainless steel, weighing approximately 5.5 pounds. This safety note examines the VSG steel design. Specific experiments may require orienting the VSG snout in 90 degrees increment with respect to the Unimount flange. This is done by changing the bolts position on the VSG-main body adapter flange to the Unimount adapter plate. There is no hazard involved in handling the VSG during this procedure as it is done outside the target chamber on the cart rail before installing on the TIM. This safety note addresses the mechanical integrity of the VSG structure, the tilt rotating fixture, the cart rails with handle and their connections. Safety Factors are also calculated for the MSPEC in place of the VSG.

Mukherjee, S K; Emig, J A; Griffith, L V; Heeter, R F; House, F A; James, D L; Schneider, M B; Sorce, C M

2010-01-25T23:59:59.000Z

205

Application of a systems-theoretic approach to risk analysis of high-speed rail project management in the US  

E-Print Network [OSTI]

High-speed rail (HSR) is drawing attention as an environmentally-friendly transportation mode, and is expected to be a solution for socio-technical transportation issues in many societies. Currently, its market has been ...

Kawakami, Soshi

2014-01-01T23:59:59.000Z

206

Productivity of the U.S. freight rail industry: a review of the past and prospects for the future  

E-Print Network [OSTI]

Productivity growth in the U.S. freight rail industry has slowed in recent years, raising the issue of the sustainability of the significant improvements achieved during the past three decades. Indeed, between 1979 and ...

Kriem, Youssef

2011-01-01T23:59:59.000Z

207

The agglomerative role of transportation investment : a comparative analysis of Portuguese and American high-speed rail proposals  

E-Print Network [OSTI]

This research uses a comparative analysis of High-Speed Rail (HSR) impacts from proposals in both Portugal and Illinois to understand the wider economic implications of these proposed transportation links and corollary ...

Westrom, Ryan J. (Ryan Jeremy)

2014-01-01T23:59:59.000Z

208

Cross-border barriers to the development of HSR projects : analysis of the Singapore- Kuala Lumpur high speed rail link/  

E-Print Network [OSTI]

It is widely recognized that the benefits of High Speed Rail (HSR) such as a driving force of the economy, helps us to reshape the activities of people and business. These benefits were brought to light for its reliability, ...

Mori, Iori

2014-01-01T23:59:59.000Z

209

A systems approach for developing, designing, and transitioning moving map technology in U.S. rail applications  

E-Print Network [OSTI]

Safety, efficiency and productivity are top priorities for rail industries, but technology implementation faces many barriers. While the demands of locomotive engineers and railroads are increasing, the industry lacks a ...

Voelbel, Kathleen

2014-01-01T23:59:59.000Z

210

Protect Anadromous Salmonids in the Mainstem Corridor, Monitoring and Evaluation, Annual Report 200-2001.  

SciTech Connect (OSTI)

In this annual Monitoring & Evaluation (M&E) report to the Bonneville Power Administration (BPA), we summarize significant activities and performance measures resultant from enhanced protection by Columbia River Inter-Tribal Fisheries Enforcement (CRITFE) in the mainstem corridor (BPA Project 2000-056). This report covers the Fiscal Year (FY) 2000 performance period -- May 15, 2000 to May 14, 2001. Quarterly progress reports have previously been submitted to BPA and are posted on the M&E Web site (www.Eco-Law.net) -- for the time period April-December 2000 (Vigg 2000b,c,d) and for the period January-June 2001 (Vigg 2001a,b). We also present comprehensive data representing the first quarter of year 2000 in this report for a pre-project comparison. In addition, we have analyzed specific annual enforcement statistics to evaluate trends during the baseline period 1996-2000. Additional statistics and more years of comprehensive baseline data are now being summarized, and will be presented in future M&E annual reports--to provide a longer time series for evaluation of trends in input, output and outcome performance standards.

Vigg, Steven; Johnson, John

2002-02-01T23:59:59.000Z

211

A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area  

SciTech Connect (OSTI)

The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing {approx}60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along {approx}3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial variability in the depth to the Hanford-Ringold inland over a critical region where borehole information is absent, identifying evidence for a continuous depression in the H-R contact between the IFRC and the river corridor. Strong natural contrasts in temperature and specific conductance of river water compared to groundwater at this site, along with periodic river stage fluctuations driven by dam operations, were exploited to yield new insights into the dynamics of groundwater-surface water interaction. Whereas FO-DTS datasets have provided meter-scale measurements of focused groundwater discharge at the riverbed along the corridor, continuous resistivity monitoring has non-invasively imaged spatiotemporal variation in the resistivity inland driven by river stage fluctuations. Time series and time-frequency analysis of FO-DTS and 3D resistivity datasets has provided insights into the role of forcing variables, primarily daily dam operations, in regulating the occurrence of focused exchange at the riverbed and its extension inland. High amplitudes in the DTS and 3D resistivity signals for long periods that dominate the stage time series identify regions along the corridor where stage-driven exchange is preferentially focused. Our work has demonstrated how time-series analysis of both time-lapse resistivity and DTS datasets, in conjunction with resistivity/IP imaging of lithology, can improve understanding of groundwater-surface water exchange along river corridors, offering unique opportunities to connect stage-driven groundwater discharge observed with DTS on the riverbed to stage-driven groundwater and solute fluctuations captured with resistivity inland.

Slater, Lee; Day-Lewis, Frederick; Lane, John; Versteeg, Roelof; Ward, Anderson; Binley, Andrew; Johnson, Timothy; Ntarlagiannis, Dimitrios

2011-08-31T23:59:59.000Z

212

Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005  

SciTech Connect (OSTI)

Evaluates opportunities to integrate hydrogen into the fueling stations of the Interstate Clean Transportation Corridor--an existing network of LNG fueling stations in California and Nevada.

Gladstein, Neandross and Associates

2005-09-01T23:59:59.000Z

213

Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask  

SciTech Connect (OSTI)

This Preliminary Design Report (PDR) provides a detailed description of the design, analyses, and testing programs for the BR-100 cask. The BR-100 is a Type B(U) cask designed for transport by rail or barge. This report presents the preliminary analyses and tests which have been performed for the BR-100 and outlines the confirmatory analyses and tests which will be performed.

none,

1990-02-01T23:59:59.000Z

214

Life Cycle Assessment Comparing the Use of Jatropha Biodiesel in the Indian Road and Rail Sectors  

SciTech Connect (OSTI)

This life cycle assessment of Jatropha biodiesel production and use evaluates the net greenhouse gas (GHG) emission (not considering land-use change), net energy value (NEV), and net petroleum consumption impacts of substituting Jatropha biodiesel for conventional petroleum diesel in India. Several blends of biodiesel with petroleum diesel are evaluated for the rail freight, rail passenger, road freight, and road-passenger transport sectors that currently rely heavily on petroleum diesel. For the base case, Jatropha cultivation, processing, and use conditions that were analyzed, the use of B20 results in a net reduction in GHG emissions and petroleum consumption of 14% and 17%, respectively, and a NEV increase of 58% compared with the use of 100% petroleum diesel. While the road-passenger transport sector provides the greatest sustainability benefits per 1000 gross tonne kilometers, the road freight sector eventually provides the greatest absolute benefits owing to substantially higher projected utilization by year 2020. Nevertheless, introduction of biodiesel to the rail sector might present the fewest logistic and capital expenditure challenges in the near term. Sensitivity analyses confirmed that the sustainability benefits are maintained under multiple plausible cultivation, processing, and distribution scenarios. However, the sustainability of any individual Jatropha plantation will depend on site-specific conditions.

Whitaker, M.; Heath, G.

2010-05-01T23:59:59.000Z

215

Environmental Life-cycle Assessment of Passenger Transportation An Energy, Greenhouse Gas, and Criteria Pollutant Inventory of Rail and Air Transportation  

E-Print Network [OSTI]

Selection in Life-Cycle Inventories Using Hybrid Approaches,and Criteria Pollutant Inventories of Automobiles, Buses,Criteria Pollutant Inventory of Rail and Air Transportation

Horvath, Arpad; Chester, Mikhail

2008-01-01T23:59:59.000Z

216

Final environment impact report supplement: Northeast corridor improvement project electrification: New Haven, CT to Boston, MA. Final report  

SciTech Connect (OSTI)

This document is a supplement to the final environmental impact report (FEIR) published in October 1994 on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electrification from New Haven, CT, to Boston, MA. The purpose of this supplement is to provide additional information relative to: the Roxbury Substation Alternative Analysis; an expanded discussion on mitigation of potential adverse impacts; draft Section 61 findings; the Memorandum of Understanding between Amtrak and the Massachusetts Bay Transportation Authority (MBTA) for Route 128 Station; Amtrak`s draft outreach program; and to address other Massachusetts Environmental Policy Act concerns.

NONE

1995-02-01T23:59:59.000Z

217

Lead isotopic evidence for synextensional lithospheric ductile flow in the Colorado River extensional corridor, western United States  

E-Print Network [OSTI]

-RELATED LAVAS 46- Th/U=15 ......... 3:: __.:.:. Th/U=4  42 . ,-, : ....... . ,.,:,..  , ::.;. :I ' ....-,.--: -.7 :-:. 34 I I I  g 23 27 3 ZOpb/ZO4pb iBor 2. Fields showing the relationship of present day oPbflo4pb to oPbflo4pb... the geochemistry of lavas from the northern Colorado River extensional corridor, we combine new data in Table I with previously published geochronologic and geochemical data from the central Black Mountains [Faulds et al., 1995; Metcalf et al., 1995] and White...

Feuerbach, Daniel L.; Reagan, Mark K.; Faulds, James E.; Walker, J. Douglas

1998-02-10T23:59:59.000Z

218

FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments  

SciTech Connect (OSTI)

To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations energy needs. The mission of the WECI is to bolster America抯 future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE抯 WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an 揳nalog resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

Thomas R. Wood

2010-01-01T23:59:59.000Z

219

Truck and rail charges for shipping spent fuel and nuclear waste  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory developed techniques for calculating estimates of nuclear-waste shipping costs and compiled a listing of representative data that facilitate incorporation of reference shipping costs into varius logistics analyses. The formulas that were developed can be used to estimate costs that will be incurred for shipping spent fuel or nuclear waste by either legal-weight truck or general-freight rail. The basic data for this study were obtained from tariffs of a truck carrier licensed to serve the 48 contiguous states and from various rail freight tariff guides. Also, current transportation regulations as issued by the US Department of Transportation and the Nuclear Regulatory Commission were investigated. The costs that will be incurred for shipping spent fuel and/or nuclear waste, as addressed by the tariff guides, are based on a complex set of conditions involving the shipment origin, route, destination, weight, size, and volume and the frequency of shipments, existing competition, and the length of contracts. While the complexity of these conditions is an important factor in arriving at a ''correct'' cost, deregulation of the transportation industry means that costs are much more subject to negotiation and, thus, the actual fee that will be charged will not be determined until a shipping contract is actually signed. This study is designed to provide the baseline data necessary for making comparisons of the estimated costs of shipping spent fuel and/or nuclear wastes by truck and rail transportation modes. The scope of the work presented in this document is limited to the costs incurred for shipping, and does not include packaging, cask purchase/lease costs, or local fees placed on shipments of radioactive materials.

McNair, G.W.; Cole, B.M.; Cross, R.E.; Votaw, E.F.

1986-06-01T23:59:59.000Z

220

Non-destructive inspection protocol for reinforced concrete barriers and bridge railings  

SciTech Connect (OSTI)

Reinforced concrete highway barriers and bridge railings serve to prevent errant vehicles from departing the travel way at grade separations. Despite the important role that they play in maintaining safety and their ubiquitous nature, barrier inspection rarely moves beyond visual inspection. In August 2008, a tractor-trailer fatally departed William Preston Lane, Jr. Memorial Bridge after it dislodged a section of the bridge barrier. Investigations following the accident identified significant corrosion of the anchor bolts attaching the bridge railing to the bridge deck. As a result of the information gathered during its investigation of the accident, the National Transportation Safety Board (NTSB) made recommendations to the Federal Highway Administration concerning Non-Destructive Evaluation (NDE) of concrete bridge railings. The Center for nondestructive evaluation (NDE) at Turner Fairbank Highway Research Center in McLean, VA is currently evaluating feasibility of using four technologies - ground penetrating radar (GPR), ultrasonic pulse-echo, digital radiography and infrared thermal imaging methods to develop bridge inspection methods that augment visual inspections, offer reliable measurement techniques, and are practical, both in terms of time and cost, for field inspection work. Controlled samples containing predefined corrosion levels in reinforcing steel were embedded at barrier connection points for laboratory testing. All four NDE techniques were used in the initial phase I testing. An inspection protocol for detecting and measuring the corrosion of reinforced steel embedded in the anchorage system will be developed as part of phase II research. The identified technologies shall be further developed for field testing utilizing a structure with a barrier in good condition and a structure with a barrier in poor condition.

Chintakunta, Satish R. [Engineering and Software Consultants, Inc., 14123 Robert Paris Ct., Chantilly, VA 20151 (United States); Boone, Shane D. [Federal Highway Administration, Turner Fairbank Highway Research Center, 6300 Georgetown Pike, McLean, VA 22101 (United States)

2014-02-18T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Effect of Rail Rate Deregulation: The Case of Wheat Exports from the South Plains.  

E-Print Network [OSTI]

Cost 3.398 2.582 Barge Fixed Cost 1.182 .532 Variable Cost 3.938 1.685 Total Cost 5.120 2.217 Loading Grain Truck Fixed Cost .565 1.395 5.251 Variable Cost 2.065 1.058 2.089 Total Cost 2.630 2.453 7.340 Rail Fixed Cost .579 1.171 1... efficiently, although they do occasionally re ceive barge-delivered grain. On the basis of North Texas port elevator characteristics, the unloading cost was estimated at 3.0~ per bushel. Corpus Christi does not have barge unloading facilities. TABLE 3...

Fuller, Stephen; Shanmugham, C. V.

1982-01-01T23:59:59.000Z

222

Final environmental impact statement/report. Volume 4. Comment letters and public hearing transcripts. Northeast corridor improvement project electrication: New Haven, CT to Boston, MA  

SciTech Connect (OSTI)

This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume IV) reprints the comments received on the DEIS/R.

NONE

1994-10-01T23:59:59.000Z

223

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

Peterson, M.J.

2005-12-20T23:59:59.000Z

224

Stray Current Corrosion in Electrified Rail Systems --Final Report Dr. Thomas J. Barlo, formerly of Northwestern University  

E-Print Network [OSTI]

Stray Current Corrosion in Electrified Rail Systems -- Final Report Dr. Thomas J. Barlo, formerly SUMMARY Despite a relatively mature technology for its control, corrosion caused by stray current from of that cost is the result of corrosion of the electrified rapid-transit system itself, and part is the result

225

See also http://www.umass.edu/loop/content/civil-andenvironmental-engineering-student-wins-fulbright-study-rail-transportation-spain  

E-Print Network [OSTI]

See also http://www.umass.edu/loop/content/civil-andenvironmental-engineering- student-wins-fulbright-study-rail-transportation-spain to study transportation engineering in Madrid, Spain during 2013-2014. I had the good fortune to meet with Radha a short time ago and learned during our conversation that while abroad in Spain, one of her

Massachusetts at Amherst, University of

226

Evaluation of Power-Constant Dual-Rail Logic as a Protection of Cryptographic Applications in FPGAs  

E-Print Network [OSTI]

-end applica- tions that require embedded cryptography. These devices must thus be protected against physical attacks. However, unlike ASICs, in which custom and backend-level counter-measures can be devised, FPGAs-rail logic. First of all, we report a CAD methodology for achieving WDDL in FPGA. An experimental security

Boyer, Edmond

227

Understanding the Link Between Bicyclists and Light Rail Survey Results from Bicycle Riders on MAX in Portland, Oregon  

E-Print Network [OSTI]

Understanding the Link Between Bicyclists and Light Rail Survey Results from Bicycle Riders on MAX Introduction 1 Portland Bicycle Master Plan, Section V 2 History of Bicycles on MAX 3 Benefits of the Bicycle is a bicycle friendly city. In 1995 and 1998, Bicycling Magazine named Portland the best city for bicycling

Bertini, Robert L.

228

ANALYSIS OF THE SHEAR BEHAVIOR OF RAIL PAD ASSEMBLIES AS A COMPONENT OF THE CONCRETE SLEEPER FASTENING SYSTEM  

E-Print Network [OSTI]

Fastening System RAIL PAD ASSEMBLY LATERAL DISPLACEMENT FAILURE MODE AND EFFECT ANALYSIS (FMEA) INTRODUCTION life FMEA is used to define, identify, evaluate and eliminate potential failures from the system FMEA was used to guide the process of answering questions related to the component behavior and also

Barkan, Christopher P.L.

229

Sandia National Laboratories: SEI  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik SpoerkeSolarCybernetics:2P DOE-Sponsored Reference0P7MSCO2 SCO2

230

Analyzing policy, land use and zoning characteristics : understanding the potential to build housing near rail in the city of Los Angeles  

E-Print Network [OSTI]

Firstly, the author provides an overview and analysis of the City of Los Angeles political framework and implementation strategies to encourage the housing development near rail stations. Secondly, the author discusses the ...

Camarena, Erin M

2005-01-01T23:59:59.000Z

231

Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509  

SciTech Connect (OSTI)

Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previously employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)

Boyle, J.D. [U.S. Army Corps of Engineers - Buffalo District, Buffalo, New York 14207 (United States)] [U.S. Army Corps of Engineers - Buffalo District, Buffalo, New York 14207 (United States); Fort, E. Joseph; Lorenz, William [Cabrera Services (Cabrera) East Harford, CT 06108 (United States)] [Cabrera Services (Cabrera) East Harford, CT 06108 (United States); Mills, Andy [Shaw Environmental and Infrastructure, Inc. (Shaw) Baton Rouge, LA 70809 (United States)] [Shaw Environmental and Infrastructure, Inc. (Shaw) Baton Rouge, LA 70809 (United States)

2013-07-01T23:59:59.000Z

232

DAMOP BICYCLE EXCURSION Wisconsin led in the Rail to Trail conversion starting in the 1960s. The state now enjoys ~1000 miles of State Park  

E-Print Network [OSTI]

DAMOP BICYCLE EXCURSION Wisconsin led in the Rail to Trail conversion are invited on a bicycle excursion organized by Thad Walker and Jim Lawler. Directions & Costs: The excursion will depart from Machinery Row Bicycles (0.4 mi

Walker, Thad G.

233

Transportation of Spent Nuclear Fuel and High Level Waste to Yucca Mountain: The Next Step in Nevada  

SciTech Connect (OSTI)

In the U.S. Department of Energy's ''Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada,'' the Department states that certain broad transportation-related decisions can be made. These include the choice of a mode of transportation nationally (mostly legal-weight truck or mostly rail) and in Nevada (mostly rail, mostly legal-weight truck, or mostly heavy-haul truck with use of an associated intermodal transfer station), as well as the choice among alternative rail corridors or heavy-haul truck routes with use of an associated intermodal transfer station in Nevada. Although a rail line does not service the Yucca Mountain site, the Department has identified mostly rail as its preferred mode of transportation, both nationally and in the State of Nevada. If mostly rail is selected for Nevada, the Department would then identify a preference for one of the rail corridors in consultation with affected stakeholders, particularly the State of Nevada. DOE would then select the rail corridor and initiate a process to select a specific rail alignment within the corridor for the construction of a rail line. Five proposed rail corridors were analyzed in the Final Environmental Impact Statement. The assessment considered the impacts of constructing a branch rail line in the five 400-meter (0.25mile) wide corridors. Each corridor connects the Yucca Mountain site with an existing mainline railroad in Nevada.

Sweeney, Robin L,; Lechel, David J.

2003-02-25T23:59:59.000Z

234

Final environmental impact statement/report and 4(f) statement. Volume 1. Northeast corridor improvement project electrification: New Haven, CT to Boston, MA. Final report  

SciTech Connect (OSTI)

This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume I) is the main body of the FEIS/R and includes a 4(f) Statement on the proposed location of an electrification facility in the Great Swamp Wildlife Management Area.

NONE

1994-10-31T23:59:59.000Z

235

Appendix to the final environmental impact report supplement. Northeast Corridor Improvement Project electrification, New Haven, CT to Boston, MA. Final report  

SciTech Connect (OSTI)

This document is an appendix to the final Environmental Impact Report Supplement, published on February 15, 1995, addressing the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. The purpose of this document is to discuss the selection of the Boston area electrical substation site and the relocation of a paralleling station in East Foxboro.

NONE

1995-05-01T23:59:59.000Z

236

Final environmental impact statement/report. Volume 2. Technical studies. Northeast corridor improvement project electrification: New Haven, CT to Boston, MA  

SciTech Connect (OSTI)

This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume II) presents additional technical studies to supplement Volume III of the DEIS/R issued in October 1993 (PB94-111838).

NONE

1994-10-01T23:59:59.000Z

237

Final Supplemental Environmental Impact Statement for a Geologic...  

Broader source: Energy.gov (indexed) [DOE]

- Nevada Rail Transportation Corridor DOEEIS-0250F-S2 and Final Env Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear...

238

FINAL PROJECT REPORT: A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area  

SciTech Connect (OSTI)

The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing ~60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along ~3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial variability in the depth to the Hanford-Ringold inland over a critical region where borehole information is absent, identifying evidence for a continuous depression in the H-R contact between the IFRC and the river corridor. Strong natural contrasts in temperature and specific conductance of river water compared to groundwater at this site, along with periodic river stage fluctuations driven by dam operations, were exploited to yield new insights into the dynamics of groundwater-surface water interaction. Whereas FO-DTS datasets have provided meter-scale measurements of focused groundwater discharge at the riverbed along the corridor, continuous resistivity monitoring has non-invasively imaged spatiotemporal variation in the resistivity inland driven by river stage fluctuations. Time series and time-frequency analysis of FO-DTS and 3D resistivity datasets has provided insights into the role of forcing variables, primarily daily dam operations, in regulating the occurrence of focused exchange at the riverbed and its extension inland. High amplitudes in the DTS and 3D resistivity signals for long periods that dominate the stage time series identify regions along the corridor where stage-driven exchange is preferentially focused. Our work has demonstrated how time-series analysis of both time-lapse resistivity and DTS datasets, in conjunction with resistivity/IP imaging of lithology, can improve understanding of groundwater-surface water exchange along river corridors, offering unique opportunities to connect stage-driven groundwater discharge observed with DTS on the riverbed to stage-driven groundwater and solute fluctuations captured with resistivity inland.

Lee Slater

2011-08-15T23:59:59.000Z

239

QA in the design and fabrication of the TMI-2 rail cask  

SciTech Connect (OSTI)

EGandG Idaho, Inc., acting on behalf of the US Department of Energy, is responsible for transporting core debris from Three Mile Island-Unit 2 to the Idaho National Engineering Laboratory. Transportation of the debris is being accomplished using an NRC licensed container, called the NuPac 125-B. This paper describes the NuPac 125-B Rail Cask and the quality assurance (QA) requirements for that system. Also discussed are the QA roles of the various organizations involved in designing, building, inspecting and testing the NuPac 125-B. The paper presents QA/QC systems implemented during the design, procurement, and fabrication of the cask to assure compliance with all applicable technical codes, standards and regulations. It also goes beyond the requirements aspect and describes unique QA/QC measures employed to assure that the cask was built with minimum QA problems. Finally, the lessons learned from the NuPac 125-B project is discussed. 4 refs., 4 figs.

Hayes, G.R.

1988-01-01T23:59:59.000Z

240

Close-in blasting at the TRI-MET light rail tunnels in Portland, Oregon  

SciTech Connect (OSTI)

Frontier/Traylor Joint Venture is presently constructing a section of the Tri-County Metropolitan Transit District of Oregon`s (TRI-MET) Westside Light Rail System. This new section will extend Portland`s existing transit system to the western suburbs of Beaverton and Hillsboro. The drill-blast excavations at this project include 10,000 feet of 20 foot tunnel, 18 cross passages, three shafts, an underground railway station, and a U-wall open cut. From a blast designer`s perspective, this job has been extremely challenging. Blast vibration is limited to 0.5 ips at 200 feet or at the nearest structure, and airblast is limited to 129 dB--linear peak and 96 dB--C scale. The tunnels pass under heavily built up areas and have top of tunnel to surface cover distances as low as 70 feet. Surface blasting in the 26,000 cubic yard U-wall excavation was limited to five short nighttime periods due to its proximity to the very busy highway 26. This paper describes the techniques that were used to develop safe blasting designs for the TRI-MET Surface blasts and tunnel rounds. It also discusses the measures that were necessary to mitigate noise, vibration, and flyrock.

Revey, G.F.; Painter, D.Z.

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Shielding and criticality analyses of phase I reference truck and rail cask designs for spent nuclear fuel  

SciTech Connect (OSTI)

Results are presented herein to determine the adequacy with respect to shielding regulations of reference designs for a truck cask containing 2 PWR or 5 BWR assemblies of standard burnup (45 GWd/MTU for PWR, 40 GWd/MTU for BWR) and 1 PWR assembly with extended burnup (55 GWd/MTU). The study also includes reference and modified rail cask designs with projected payloads of 8, 10, or 12 PWR assemblies. The burnup/age trends are analyzed in one dimension for both Pb and depleted uranium (DU) gamma-ray shields. The results of the two-dimensional shielding analysis uphold the one-dimensional results as being an appropriate means of studying the burnup/age trends for the truck cask. These results show that the reference design for the Pb-shield truck cask is inadequate for all cases considered, while the DU-shield truck cask is capable of carrying the desired payloads. The one-dimensional shielding analysis results for the reference Pb and DU rail casks indicate substantial margins exist in the side doses for reasonable burnup/age combinations. For a Pb-cask configuration, margins exist primarily for long-cooled (15 years) fuel. For the modified Pb and DU rail casks, the 2-m dose rates offer substantial margins below the regulatory limits for all burnup values considered provided the spent fuel has cooled for {>=}10 years. The modified Pb and DU casks yield essentially identical results and, hence, could be considered equivalent from a shielding perspective. The criticality analyses that were performed indicate that a truck basket can be designed to provide an adequate subcritical margin for 2 PWR assemblies enriched to 5 wt%. While the 10- and 12- assembly rail cask designs are very close to the regulatory limit of 0.95 for k{sub eff}, after accounting for a 0.01 {Delta}k bias and 2 standard deviations, the limit is exceeded by about 3%. It is believed that a combination of decreased enrichments and/or increased water gaps should allow these baskets to be acceptable.

Broadhead, B.L.; Childs, R.L.; Parks, C.V.

1996-03-01T23:59:59.000Z

242

High-pressure late cycle direct injection of natural gas in a rail medium speed diesel engine  

SciTech Connect (OSTI)

The performance of an Electro-Motive Division (EMD) 567B, two-cylinder locomotive research engine, when operated on high-pressure/late-cycle injection of natural gas, is presented in this paper. A redesign and fabrication of the fuel system was undertaken to facilitate the consumption of natural gas. A small percentage of No.2 diesel fuel (DF-2) was used to ignite the natural gas. Engine performance, while running natural gas, resulted in matching rated speed and power with slightly lower thermal efficiency. Full power was achieved with a ratio of 99 percent natural gas and 1 percent diesel fuel. However, at high natural gas to diesel fuel ratios, audible knock was detected. The primary objective of the project was to establish technical feasibility of, and basic technology for, operating medium-speed rail diesel engines on high-pressure natural gas. Secondary objectives were to attain adequate engine performance levels for rail application, develop a system oriented toward retrofit of in-service locomotives, and realize any potential improvements in thermal efficiency due to use of the high-pressure/late-cycle approach.

Wakenell, J.F.; O'Neal, G.B.; Baker, Q.A.

1987-01-01T23:59:59.000Z

243

Technical Report Documentation Page 1. Report No.  

E-Print Network [OSTI]

Corridors, Megaregions, Rail, Truck, Fuel Efficiency, Freight Operating Costs. 18. Distribution Statement. To address this need, a truck-rail intermodal toolkit was developed for multimodal corridor analysis characteristics. The toolkit includes techniques to acquire data for simulating line-haul movements, and models

244

Pipeline corridors through wetlands  

SciTech Connect (OSTI)

This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity.

Zimmerman, R.E.; Wilkey, P.L. (Argonne National Lab., IL (United States)); Isaacson, H.R. (Gas Research Institute (United States))

1992-01-01T23:59:59.000Z

245

Pipeline corridors through wetlands  

SciTech Connect (OSTI)

This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity.

Zimmerman, R.E.; Wilkey, P.L. [Argonne National Lab., IL (United States); Isaacson, H.R. [Gas Research Institute (United States)

1992-12-01T23:59:59.000Z

246

River Corridor - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromisingStories 禄SubmitterJ. Norby (2007)Rising SeaProjects &

247

I-5 Corridor Reinforcement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area.Portaldefault Sign In About | Careers | Contact |

248

Performance Analysis of the SensorNet's Southeastern Transportation Corridor Pilot Viewer at the Dorchester West Bound Interstate Weigh Station  

SciTech Connect (OSTI)

Since the 9-11 attacks, the United States has increased its focus on developing technologies designed to warn us in the event of another attack and to prevent these attacks from happening in the first place. The SensorNet research group at Oak Ridge National Laboratory's (ORNL) Computer Science and Engineering Division is participating in this effort by developing systems to give critical real-time information to federal, state, and local emergency response decision makers. SensorNet has approached this goal by putting together a system with several sensors and programs called the Southeastern Transportation Corridor Pilot project (SETCP). The SETCP utilizes interstate weigh stations not only to weigh the passing trucks but also to check for gamma and neutron radiation inside the truck without the aid of a human in close proximity. The system also collects additional data that help identify the truck (the truck's length, weight, license plate number, and photographs of the truck). The objective of this research work was to characterize and analyze the data collected from the South Carolina weigh station on I-26W and compare it with previous data analysis on the performance of the Tennessee weigh station on I-40E. The purpose was to find patterns in the trucks with radioactive alarms and, regional truck traffic, as well as to find patterns of inconsistency in the system (illogical length measurements of the truck, inaccurate readings and character recognition of the license plate). During a three-month period, radioactive alarms and traffic patterns were identified and characterized by grouping all of the data and making graphs and charts in Microsoft Excel to show the flow of traffic, the type of truck traffic, the number of alarms and other information. Inconsistence patterns were found by analyzing the data, looking for missing or illogical information, and determining how often it happens. The improvements of these inconsistencies were also analyzed after repairs were made to the system. Given the small number of radiation alarms detected, there were no clear patterns found. Further research has to be done in this area; also, the analysis period needs to be extended from three months to a year. For traffic flow patterns, it was found that the truck traffic was heaviest on Monday, Tuesday, and Wednesday. The inconsistencies found and fixed in the system were the illogical length measurements and the inaccurate reading and character recognition of the license plate. During the summer of 2007, a Florida International University (FIU) student supported this research work under the direct supervision of Mr. David Hill at ORNL's Computer Science and Engineering Division. The 10-week student internship was supported by the DOE/FIU Science and Technology Workforce Initiative, an innovative program developed by the US Department of Energy's Environmental Management (DOE-EM) and FIU's Applied Research Center (FIU-ARC) (authors)

Colon Mendoza, R.A.; Lagos, L.E. [Applied Research Center, Florida International Univ., Miami, FL (United States); Hill, D.E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

249

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

SciTech Connect (OSTI)

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

250

Final environmental impact statement/report. Volume 3. Response to comments on draft environmental impact statement/report. Northeast corridor improvement project electrification: New Haven CT to Boston, MA  

SciTech Connect (OSTI)

This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume III) of the FEIS/R presents summaries of comments received on the DEIS/R and responses to these comments.

NONE

1994-10-31T23:59:59.000Z

251

CMRR SEIS commments Tuesday Final  

National Nuclear Security Administration (NNSA)

estimated: * Waste generation may double, triple, or even quadruple, which violates DOE pollution prevention policies; * Air emissions are expected to increase several fold; and...

252

Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993  

SciTech Connect (OSTI)

The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created by the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation.

Shem, L.M.; Zimmerman, R.E.; Alsum, S.K. [Argonne National Lab., IL (United States). Center for Environmental Restoration Systems; Van Dyke, G.D. [Argonne National Lab., IL (United States). Center for Environmental Restoration Systems]|[Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology

1994-12-01T23:59:59.000Z

253

A Fully Automated Method for CT-on-Rails-Guided Online Adaptive Planning for Prostate Cancer Intensity Modulated Radiation Therapy  

SciTech Connect (OSTI)

Purpose: This study was designed to validate a fully automated adaptive planning (AAP) method which integrates automated recontouring and automated replanning to account for interfractional anatomical changes in prostate cancer patients receiving adaptive intensity modulated radiation therapy (IMRT) based on daily repeated computed tomography (CT)-on-rails images. Methods and Materials: Nine prostate cancer patients treated at our institution were randomly selected. For the AAP method, contours on each repeat CT image were automatically generated by mapping the contours from the simulation CT image using deformable image registration. An in-house automated planning tool incorporated into the Pinnacle treatment planning system was used to generate the original and the adapted IMRT plans. The cumulative dose杤olume histograms (DVHs) of the target and critical structures were calculated based on the manual contours for all plans and compared with those of plans generated by the conventional method, that is, shifting the isocenters by aligning the images based on the center of the volume (COV) of prostate (prostate COV-aligned). Results: The target coverage from our AAP method for every patient was acceptable, while 1 of the 9 patients showed target underdosing from prostate COV-aligned plans. The normalized volume receiving at least 70 Gy (V{sub 70}), and the mean dose of the rectum and bladder were reduced by 8.9%, 6.4 Gy and 4.3%, 5.3 Gy, respectively, for the AAP method compared with the values obtained from prostate COV-aligned plans. Conclusions: The AAP method, which is fully automated, is effective for online replanning to compensate for target dose deficits and critical organ overdosing caused by interfractional anatomical changes in prostate cancer.

Li, Xiaoqiang; Quan, Enzhuo M.; Li, Yupeng [Department of Radiation Physics, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Pan, Xiaoning [Department of Radiation Oncology, University of Texas Health Science Center at Tyler, Tyler, Texas (United States); Zhou, Yin [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Wang, Xiaochun [Department of Radiation Physics, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Du, Weiliang [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Kudchadker, Rajat J.; Johnson, Jennifer L. [Department of Radiation Physics, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Kuban, Deborah A.; Lee, Andrew K. [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Zhang, Xiaodong, E-mail: xizhang@mdanderson.org [Department of Radiation Physics, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)

2013-08-01T23:59:59.000Z

254

Pipeline corridors through wetlands - impact on plant communities: Mill Creek Tributary Crossing, Jefferson County, New York, 1991 survey. Topical report, June 1991--April 1993  

SciTech Connect (OSTI)

The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted in June 1991 at the Mill Creek tributary crossing, Jefferson County, New York. One pipeline had been installed through the wetland in 1966, and another was scheduled to be installed later in 1991. Data were collected along the existing pipeline ROW and also along the planned ROW for use as baseline data in future studies. Four separate communities were surveyed. A scrub-shrub wetland and a forested wetland were sampled along the existing ROW where the planned pipeline was to be installed. A mixed vegetation community was sampled along the existing ROW, west of where the planned pipeline would joint the ROW. A marsh community was sampled along the route of the planned pipeline. All plant species found on the ROW of the scrub-shrub community were also present in the adjacent natural areas. The vegetation on the ROW of the forested wetland community also consisted mostly of species found in the adjacent natural areas. In the mixed vegetation community, a small drainage channel present on the ROW, possibly resulting from the pipeline construction, provided habitat for a number of obligate species not found in other areas of this community. Differences noted among different areas of this community were also attributed to slight variations in elevation.

Van Dyke, G.D. [Argonne National Lab., IL (United States)]|[Trinity Christian College, Palos Heights, IL (United States); Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

1994-12-01T23:59:59.000Z

255

Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental Impacts. The range of environmental impacts, beneficial and adverse, are described for the proposed action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. A brief description of permits and regulatory requirements for the proposed action is provided. (7) Organizations Consulted. Any outside agencies, groups, or individuals contacted as part of environmental assessment documentation preparation are listed. (8) References. Documents used to provide information or data are listed. The appendices contain additional information necessary to support an understanding of the proposed action, alternatives, and potential impacts is provided. Comments resulting from review of the environmental assessment by states and tribes or other stakeholders and the response to those comments will be included in the appendices.

N /A

1998-08-01T23:59:59.000Z

256

http://tti.tamu.edu > Variable message signs > Traffic actuated controllers > Traffic signals > Flashing traffic signals > Lane use control signals > Road markings > Rumble strips > Warrants (Traffic control devices) > Gro  

E-Print Network [OSTI]

agencies and private- sector companies on the design, construction, testing and evaluation of highway railings > Transportation corridors > Streambeds > Pipelin Street lighting > Freeways > Highways > Arterial > Light emitting diodes > Portable equipment > Construction equipment > Roadbuilding machinery

257

Is planning failing? : the impacts of decision making processes on the Green Line Extension  

E-Print Network [OSTI]

Research was conducted on the proposed Green Line Extension, a light rail corridor from Cambridge through Somerville and Medford, Massachusetts. The project is being undertaken by the Massachusetts Executive Office of ...

Ciborowski, Matthew A

2009-01-01T23:59:59.000Z

258

E-Print Network 3.0 - average european passenger Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

heavily congested urban rail corridor. When peak-hour demand temporally... exceeds the maximum loading capacity of a train unit, passengers may not be able to board the next...

259

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | Department ofThatGrid3 ProgramIDPromotingNo. 154 -EIS,

260

The Hanford Story: River Corridor  

Broader source: Energy.gov [DOE]

This is the seventh chapter of The Hanford Story, a multimedia presentation that provides an overview of the Hanford Site梚ts history, today's cleanup activities, and a glimpse into the possibilities of future uses of the 586-square-mile government site in southeast Washington State.

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Sandia National Laboratories: Northeast Corridor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNo More Green Waste in the LandfillNortheast

262

rail inspections matrix  

Broader source: Energy.gov (indexed) [DOE]

of Air Brakes 4 - Air Brakes and Parts 5 - Air Brake Hoses and Hose Supports 6 - Brake Beams 7 - Brake Beam Hangers 8 - Brake Beam Hanger Brackets and Bracket Wear Plates 9 -...

263

rail regulatory matrix  

Broader source: Energy.gov (indexed) [DOE]

49 CFR 221 4 4 Carrier 49 CFR 221-Minimum requirements for rear-end marking devices on trains. 49 CFR 223 Carrier 49 CFR 223-Minimum Federal safety standards for impact resistance...

264

Rail Coal Transportation Rates  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S.30 2013 Macroeconomicper8,170Thousand2.442 3.028 3.803 3.971Feet)06Coal

265

Rail Coal Transportation Rates  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S.30NaturalThousand Cubic Feet) OmanThousand36,610.05 KeroseneCoal Glossary

266

Rail Coal Transportation Rates  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S.30NaturalThousand Cubic Feet) OmanThousand36,610.05 KeroseneCoal

267

Rail Coal Transportation Rates  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0,InformationU.S.Feet) Year Weekly77a.REVISIONreports

268

Microsoft Word - CLWR Draft SEIS Comment  

National Nuclear Security Administration (NNSA)

ron mental I mpa ct Statemen t for the Production of Tritium in a Commercial Light Water Reactor U.S. Department of Energy National Nuclear Security Administration Written Comment...

269

WIPP SEIS-II - Main Menu  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Reviewwill help prepareA Review ScientificUSAFiStart Here

270

Microsoft Word - CLWR Draft SEIS Comment  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of the Yucca MountainSourceUsers6 SPONSORED BYI w r ~

271

WIPP SEIS-II - Main Menu  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout Printable Version Bookmark and Wind FOIA*RCRAStart Here

272

NR Pu SEIS Advisory 07272012_Clean  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions and Achievements of Women |hits 21Species. |RPSEANP

273

Integrated main rail, feed rail, and current collector  

DOE Patents [OSTI]

A separator plate is described for a fuel cell comprising an anode current collector, a cathode current collector and a main plate, the main plate disposed between the anode current collector and the cathode current collector. The anode current collector forms a flattened peripheral wet seal structure and manifold wet seal structure on the anode side of the separator plate and the cathode current collector forms a flattened peripheral wet seal structure and manifold wet seal structure on the cathode side of the separator plate. In this manner, the number of components required to manufacture and assemble a fuel cell stack is reduced. 9 figs.

Petri, R.J.; Meek, J.; Bachta, R.P.; Marianowski, L.G.

1994-11-08T23:59:59.000Z

274

Integrated main rail, feed rail, and current collector  

DOE Patents [OSTI]

A separator plate for a fuel cell comprising an anode current collector, a cathode current collector and a main plate, the main plate disposed between the anode current collector and the cathode current collector. The anode current collector forms a flattened peripheral wet seal structure and manifold wet seal structure on the anode side of the separator plate and the cathode current collector forms a flattened peripheral wet seal structure and manifold wet seal structure on the cathode side of the separator plate. In this manner, the number of components required to manufacture and assemble a fuel cell stack is reduced.

Petri, Randy J. (Crete, IL); Meek, John (Downers Grove, IL); Bachta, Robert P. (Chicago, IL); Marianowski, Leonard G. (Mount Prospect, IL)

1994-01-01T23:59:59.000Z

275

EIS-0026-S2: Waste Isolation Pilot Plant Disposal Phase, Carlsbad, New Mexico  

Broader source: Energy.gov [DOE]

SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a...

276

Shunting Minimal Rail Car Allocation  

E-Print Network [OSTI]

Jun 19, 2003 ... empty cars are characterized by a track, a car type, and the desired quantity. ... type of material or a car type, the tonnage or the number of cars...

2003-06-19T23:59:59.000Z

277

Energy Transport Corridor Draft Environmental Impact Statement...  

Energy Savers [EERE]

fractional percentages are on lands managed by the Department of the Interior's Fish and Wildlife Service, Bureau of Reclamation and National Park Service, or by the...

278

The problems US 10 corridor context  

E-Print Network [OSTI]

Indirect property owner impacts oCosts #12;#12;路At existing Armstrong 路Slightly to the west of Armstrong 路Approximately a quarter of a mile to the west of Armstrong 路Greater than a quarter of a mile to the west of Armstrong #12;路Slightly west of Armstrong oRight of way impacts oConstruction impacts oVisibility o

Minnesota, University of

279

DOE Affirms National Interest Electric Transmission Corridor...  

Broader source: Energy.gov (indexed) [DOE]

2, 2007 DOE Announces Membership of New Electricity Advisory Committee, April 17, 2008 Senior DOE Officials in Spain to Participate in World Petroleum Congress, July 1, 2008...

280

Innovative Corridors Initiative: Business Model Analysis  

E-Print Network [OSTI]

and management techniques, substitution of private resources and personnel for constrained public resources, and access to newmanagement and financial resources in new ways to achieve certain public

Shaheen, Susan; Lingham, Viginia; Finson, Rachel S.

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Boston Urban Farm : mending the Southwest Corridor  

E-Print Network [OSTI]

This work studies Boston's segregated nature in terms of race and class especially as this coincides with the physical form of the city. Known for its strong neighborhoods, Boston cannot escape definite boundaries between ...

Smith, Timothy Eric

1990-01-01T23:59:59.000Z

282

Innovative Corridors Initiative: Business Model Analysis  

E-Print Network [OSTI]

variety of services. All service contracts and constructioncontract managers and service contract analysts work closely

Shaheen, Susan; Lingham, Viginia; Finson, Rachel S.

2007-01-01T23:59:59.000Z

283

River Corridor Closure Project Partnering Performance Agreement |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department ofRequirementsEnergyJDicksonDepartment of

284

Interstate Clean Transportation Corridor Project Under Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared LandResponses to EngineeredA GENERAL2Radiative Transfer Model and

285

BPA I-5 Corridor Reinforcement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA t iBudget2/4/139/4/2012 Bnot redirected to

286

BPA releases I-5 Corridor Reinforcement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents and Settings\mxk9505\Local5

287

Southwest Area Corridor Map | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of Energy U.S.Improve Emitter Efficiency Under

288

River Corridor Closure Project Partnering Performance Agreement  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictions on FederalDepartment ofUserRita Franklin About Us

289

Lake Michigan Corridor Alternative Fuel Implementation Initiative  

Broader source: Energy.gov (indexed) [DOE]

Fleet Program (Indiana) 2.4: Document Success and Quantify Impact 2.5: Generation of Smart Green Purchasing Policy Task 3: Barrier Reduction Initiatives 3.1: Weights and...

290

Final Independent External Peer Review Report San Clemente Storm Damage and Shoreline  

E-Print Network [OSTI]

Clemente, Orange County, California. The beaches throughout this study area have historically suffered from and Shoreline Protection Feasibility Study by Battelle 505 King Avenue Columbus, OH 43201 for Department is owned by the Orange County Transportation Authority. This commuter rail corridor is among the busiest

US Army Corps of Engineers

291

Hydrogen's role in a nuclear renaissance Oct 22, 2007 04:30 AM  

E-Print Network [OSTI]

#12;Hydrogen's role in a nuclear renaissance Oct 22, 2007 04:30 AM Tyler Hamilton TORONTO STAR Nuclear energy is key to establishing a hydrogen-powered rail corridor in Toronto, says Greg Naterer with hydrogen, he says, is that 96 per cent of what's produced in the world comes from fossil fuels

Naterer, Greg F.

292

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Chicago, Milwaukee, and St. Paul Rail Yard Company Site in Perry, Iowa. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites  

SciTech Connect (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chicago, Milwaukee & St. Paul Rail Yard Company site in Perry, Iowa, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

2013-03-01T23:59:59.000Z

293

MineSeis - A MATLAB@ GUI Program to  

Office of Scientific and Technical Information (OSTI)

Am. 82, 2430-2447. Chiappetta, R. F., D. G. Borg and V. A. Sterner (1987). Explosives and Rock Blasting, Atlas Powder Company, Dallas, Texas. Day, S. M., N. Rimer and J. T. Cherry...

294

SEI2: Wide Area Wireless Networks for Geophysics  

E-Print Network [OSTI]

parabolic. To antennas, solar panel, To sensor Line of radioBatteries and 40W solar panels 旻ield tests of acquisition

Paul Davis; Allen Husker; Igor Stubailo; Richard Guy; Sam Irvine; John Propst

2005-01-01T23:59:59.000Z

295

Probeklausur Experimentalphysik IV Gegeben sei eine 1-dimensionale Potentialstufe  

E-Print Network [OSTI]

das Teilchen an der Stufe reflektiert? Aufgabe 2 Im Spektrum des Wasserstoffs tritt eine Linie mit der

296

Probeklausur Musterlsung Gegeben sei eine 1-dimensionale Potentialstufe  

E-Print Network [OSTI]

Wasserstoffs tritt eine Linie mit der Wellenl盲nge = 1874 nm auf. (a) Welche Hauptquantenzahlen n1 und n2

297

SPD SEIS References for Appendix I | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Task Force Review of Insights from the Fukushima Dai-Ichi Accident, July 12. 448 ORNL (Oak Ridge National Laboratory), 2012, Core Average (MOXLEU) Nuclide Ratios for Sequoyah...

298

SPD SEIS References for Appendix J | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Reliable Spent Fuel Pool Instrumentation, EA-12-051, Washington, DC, March 12. 466 ORNL (Oak Ridge National Laboratory), 1997, Fuel Qualification Issues and Strategies for...

299

SPD SEIS References for Appendix E | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Analysis Division Federal Motor Carrier Safety Administration, January. 428 Johnson, P. E., and R. D. Michelhaugh, 2003, Transportation Routing Analysis Geographic...

300

airbag frp sei: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

generated between FRP tendons and concrete J. M. Lees? and C. J. Burgoyne such as fibre-reinforced plastics (FRPs) are lightweight, strong, and, for the most part,...

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ASCE/SEI Technical Committee on Optimal Structural Design  

E-Print Network [OSTI]

-Champaign (Control Member) 路 Christopher M. Foley, Marquette University (Control Member and Assoc. Editor) 路 Dan, Brigham Young University (Member) 路 Ali Memari, Penn State University (Member) 路 Keith Mueller (Member by Christopher Foley. The session has five papers. b. "Soft Computing Potentials in Structural Optimization

Swan Jr., Colby Corson

302

SPD SEIS References for Appendix A | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Supplemental Environmental Impact Statement for the Waste Isolation Pilot Plant, DOEEIS-0026-FS, Washington, DC, January. 349 DOE (U.S. Department of Energy), 1994, Final...

303

Microsoft PowerPoint - Final CLWR SEIS PUBLIC SCOPING PRESENTATION...  

National Nuclear Security Administration (NNSA)

Statement for the Impact Statement for the Production of Tritium in a Commercial Light Water Commercial Light Water Reactor Public Scoping Meeting October 20 2011 October 20, 2011...

304

SPD SEIS Summary References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

0, Carlsbad Field Office, Carlsbad, New Mexico, November. 113 DOE (U.S. Department of Energy), 2012a, Interim Action Determination, Use of H-CanyonHB-Line to Prepare Feed for...

305

SPD SEIS References for Appendix B | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Shipment Tracking, U.S. Department of Energy," (accessed at http:tcc.transcom.energy.gov), May 14. 368 LANL (Los Alamos National Laboratory), 2012, Surplus Plutonium...

306

SPD SEIS References for Appendix G | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

(South Carolina Department of Health and Environmental Control), 2011, Chapter 61-62.5, Air Pollution Control Standards, Standard No. 2, "Ambient Air Quality Standards;" Standard...

307

EIS-0315-S1: SEIS on Caithness Big Sandy Project  

Broader source: Energy.gov [DOE]

In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS.

308

Direct Visualization of Initial SEI Morphology and Growth Kinetics During  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesDataTranslocation of Shewanella OneidensistheSynthesisLithium

309

SPD SEIS References for Appendix A | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH LASSOLICITATION, OFFER

310

SPD SEIS References for Appendix B | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH LASSOLICITATION,

311

SPD SEIS References for Appendix C | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH LASSOLICITATION,Administration C

312

SPD SEIS References for Appendix D | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH LASSOLICITATION,Administration

313

SPD SEIS References for Appendix E | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH

314

SPD SEIS References for Appendix F | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTHAdministration F | National

315

SPD SEIS References for Appendix G | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTHAdministration F |

316

SPD SEIS References for Appendix H | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTHAdministration F

317

SPD SEIS References for Appendix I | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTHAdministration FAdministration

318

SPD SEIS References for Appendix J | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTHAdministration

319

SPD SEIS References for Chapters 1 - 5 | National Nuclear Security  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTHAdministrationAdministration

320

SPD SEIS Summary References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

WIPP SEIS-II - Summary (Part 1 of 4)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApprovedRegionalDOE

322

NR Pu SEIS Advisory 07152010 _final_.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory | National Nuclearover two yearsNP User FacilitiesSRS: Jim Giusti,

323

SEIS-II - Instructions for Navigating through Acrobat Reader  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 ResourceAwards SAGE Awards ,# , onLightThePrices andSEE

324

SPD SEIS References for Chapters 1 - 5 | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

March. 116 DOE (U.S. Department of Energy), 2012d, Grouting Begins on First SRS Waste Tanks Since 1997, Press Release, (accessed on June 15, 2012, http:sro.srs.govnr2012...

325

In Situ Study of Solid Electrolyte Interphase (SEI) Formation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformation for planning experimentalPetroleumornl.govIn Situ

326

MineSeis - A MATLAB@ GUI Program to  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program PreliminaryA3,0 Alabama - Natural Gas 201328.1Challengei

327

SPD SEIS References for Appendix F | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

River Site (SRS) Cold War Built Environment Historic Preservation Annual Summary Report Fiscal Year (FY) 2008, Savannah River Operations Office, Aiken, South Carolina,...

328

SPD SEIS References for Appendix H | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

64 DOE (U.S. Department of Energy), 2008a, Supplement Analysis for Construction and Operation of a Waste Solidification Building at the Savannah River Site, DOEEIS-0283-SA-2,...

329

SPD SEIS References for Appendix C | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Air, Washington, DC, September. 388 LANL (Los Alamos National Laboratory), 2012, Final Report, Data Call to Support the Surplus Plutonium Disposition Supplemental Environmental...

330

SEI 05 GeoNet: A Platform for Rapid Distributed Geophysical Sensing SEI 05.1 Overview  

E-Print Network [OSTI]

have a solar panel attached on top, battery inside (with external power plug), internal GPS antenna network time, a backup to GPS. In a building, the instrument would not need the solar panels, although retreat in the third year of CENS. It is now gratifying to have the first units delivered for testing

California at Los Angeles, University of

331

TEC Rail TG Summary_Green Bay  

Broader source: Energy.gov (indexed) [DOE]

software. A user's guide is e-mailed to approved users to assist them in the downloading process. For TRAGIS, Mr. Paul Johnson briefly stated that he is working on updates to the...

332

Environmental Assessment of Rail Infrastructure in Illinois  

E-Print Network [OSTI]

and agricultural lands Farmland Protection Policy Act; Illinois Farmland Preservation Act; Illinois Natural Areas Acres in high flood hazard area Flood Disaster Protection Act Acres in high seismic hazard area 49 CFR Species Act; Illinois Endangered Species Act Protect high-quality natural & agricultural landscapes Acres

Illinois at Urbana-Champaign, University of

333

Microsoft Word - Rail TG.doc  

Broader source: Energy.gov (indexed) [DOE]

(AAR), Bob Fry (NCSL), Bob Halstead (Nevada Agency for Nuclear Projects), Paul Johnson (ORNL), Jay Jones (DOE), Marsha Keister (INL), Angela Kordyak (DOE, Office of General...

334

Microsoft Word - Crude by rail July 2014  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOE Tribal LeaderDE-OE0000660 Page 1June 29,

335

Microsoft PowerPoint - Rail_English  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007NavalMelvin G. Williams,UseNWTRBOverviewMeeting: New

336

Microsoft PowerPoint - Rail_Massaro  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007NavalMelvin G. Williams,UseNWTRBOverviewMeeting: New14 Annual

337

Intelligent Rail Networks | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land SurfaceVirus-InfectedIntelligent Coatings for Location

338

Public Meeting In Chicago - Rail Infrastructure Presentation  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research | DepartmentDepartment ofThermoChemJanuary 2, 20122008Secretary

339

RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartment ofColumbus HTS1, 2008EnergyDepartmentINCINERATIONSAVANNAH6on

340

Speaking of Places -- Little Rock's Emerging Nonprofit Corridor  

E-Print Network [OSTI]

exemplify the role of green building in urban recovery, andfrom the United States Green Building Council; the platinumBuildings, the highest green building rating. The riverfront

Luoni, Stephen

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Innovative Corridors Initiative: Call for Submission Process and Evaluation  

E-Print Network [OSTI]

Service, 1999]. xii Booz稟llen & Hamilton Inc. with Miller &Bank. July 2001. Booz稟llen & Hamilton. xv xvi Nossaman

Finson, Rachel S.; McCormick, Cynthia

2007-01-01T23:59:59.000Z

342

2007 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2007 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 3 bat habitat mitigation projects.

K. A. Gano; C. T. Lindsey

2007-09-27T23:59:59.000Z

343

2008 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2008 and includes 22 revegetation/restoration projects, one revegetation/mitigation project, and two bat habitat mitigation projects.

C. T. Lindsey; K. A. Gano

2008-09-30T23:59:59.000Z

344

Establishment report: Reforestation of the Pen Branch corridor and delta  

SciTech Connect (OSTI)

This report documents the role of the USDA Forest Service in the reforestation of the Pen Branch floodplain and delta. The report focuses upon the reforestation activities and monitoring to characterize the sites.

Nelson, E.A.; Dulohery, N.J.; Bunton, C.S.; Trettin, C.C.; McKee, W.H. Jr.

1995-12-01T23:59:59.000Z

345

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Broader source: Energy.gov (indexed) [DOE]

SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock,...

346

Determining Minimum Habitat Areas Habitat Corridors for Cougars  

E-Print Network [OSTI]

ambiental por un portodo de 100 af~x Usando los pardmeW~ nu~ vtabl~ el mo~lo pmaice r~osgos de extinci6n muy impacto hunum~ Dentro de la cadena montago~ los pumas se ban extingutdo re. ctontemente en un frasmento de

Beier, Paul

347

The Northeast Corridor (NEC) is the most densely settled  

E-Print Network [OSTI]

颅 congested transportation system New and innovative methods in the engineering systems field to seek new related to inputs, requirements, and outcomes of the system Methodology 1. CLIOS Process Conceptual Framework -- Physical Domain embedded on an Institutional Sphere 2. Scenario Planning Scenarios are "stories

Entekhabi, Dara

348

From marginalized to optimized : re-envisioning urban highway corridors  

E-Print Network [OSTI]

The past century of highway construction has assumed relentless growth of vehicular traffic capacity. Yet today is an era of highway rationalization, aging facilities, strained finances, peak oil concerns, climate change, ...

Spicer, Sarah J

2011-01-01T23:59:59.000Z

349

BPA, Transmission, I-5 Corridor Reinforcement Project factsheet...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

two-thirds of the electricity supply to serve the increasing population. These distant power generators rely on BPA's transmission system to move the electricity they produce to...

350

Placing power linres : GIS helps site energy corridors.  

SciTech Connect (OSTI)

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R. (Environmental Science Division)

2011-08-01T23:59:59.000Z

351

I-65 Clean Corridor: Fall Drive Overview and Media Summary  

Broader source: Energy.gov (indexed) [DOE]

attended by over 70 stakeholders and the media alike. CBS 42, the Birmingham News and web news organizations attended and provided exposure for the event. A very professional...

352

Department of Energy Awards Hanford River Corridor Contract To...  

Energy Savers [EERE]

100 Area, where nine plutonium production reactors created material for nuclear weapons; the 300 Area, where uranium fuel was fabricated and laboratory facilities reside;...

353

EIA - Natural Gas Pipeline Network - Natural Gas Transportation Corridors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scattering characterizesAnalysis &MapMajor Natural

354

Department of Energy Awards Hanford River Corridor Contract To Washington  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S.Development Projects |Reserve

355

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristina MartosLibraryClaytonCleanClean the

356

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristina MartosLibraryClaytonCleanClean theJon

357

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristina MartosLibraryClaytonCleanClean

358

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristina MartosLibraryClaytonCleanCleanDoug

359

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristina MartosLibraryClaytonCleanCleanDoug DOE

360

Lake Worth Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey, Washington: EnergyPocotopaug,Wazeecha, Wisconsin: Energy Resources

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orA BRIEF HISTORY

362

Workers Demolish Reactor Support Facility as Part of River Corridor  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment of Energyof Energy This webinarJanuary 1, 2012

363

Voluntary Protection Program Onsite Review, River Corridor Closure Project  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear GuideReportVictor KaneContract -- June 2012 |

364

H.R.S. 277 - Energy Corridors | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer County is a countyon State Highways | Open

365

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South ValleyASGovLtr.pdfAboutSheet,Proposed Penalty

366

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReport 2009SiteMajor Maintenance atT A * S H I EDepartment

367

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOE ChallengeThese(NoticeStandards NOPR for

368

UPS Ontario - Las Vegas LNG Corridor Extension Project: Bridging...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

0 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. tiarravt047saito2010p...

369

UPS Ontario - Las Vegas LNG Corridor Extension Project: Bridging...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting arravt047tiwatkins2012o...

370

UPS Ontario - Las Vegas LNG Corridor Extension Project: Bridging...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt047tisaito2011p...

371

Polychlorinated Biphenyl Presence in the Columbia River Corridor  

SciTech Connect (OSTI)

The U. S. Department of Energy (DOE) is required by Comprehensive Environmental Response, Compensation, and Liability Act of 1980 regulations to develop a conceptual understanding of potential contaminant releases from the Hanford Site based on an evaluation of existing data and known historical practices. Polychlorinated biphenyls (PCBs) are one environmental contaminant potentially released through leaks, spills, or disposal. This document presents a summary of selected relevant existing information, including environmental studies and Hanford Site analytical data.

R. M. Hermann

2007-09-06T23:59:59.000Z

372

I-5 Corridor Reinforcement Project Fact Sheet -- Keeping the...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Clatskanie Trojan Thatcher Junction Rivergate Mill Plain Fishers Road Chelatchie Carborundum 37 25 61 04 50 44 06 36 53 24 54 17 11 15 65 08 43 49 51 21 16 05 14 75 40 07 41 51...

373

USDA - NRCS Farmland Conversion Impact Rating for Corridor Type Projects -  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTagusparkCalculator Jump to: navigation, searchSolomon High SchoolForm

374

Digging Begins at Hazardous Hanford Burial Ground - River Corridor  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy CooperationRequirements Matrix U.S. DepartmentBaseload Operation |

375

Energy Transport Corridor Draft Environmental Impact Statement Available  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program -Department oftoTheseClick on the graphic to learn more the USVI'sfor

376

Milford Wind Corridor Phase I (GE Energy) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: Energy Resources JumpMicrelBirds Jump to: navigation, search

377

Milford Wind Corridor Phase II | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: Energy Resources JumpMicrelBirds Jump to: navigation, searchWind

378

I-5 Corridor Reinforcement Project - PROJECT UPDATE Newsletter  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. | EMSL Bubblesstructure eind

379

I-5 Corridor Reinforcement Project Draft EIS 33-1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. | EMSL Bubblesstructure eind33-1 November 2012

380

I-5 Corridor Reinforcement Project Draft EIS Public Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. | EMSL Bubblesstructure eind33-1 November

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

ARM - Field Campaign - 1999 Northeast Corridor Ozone & Particulate Study  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered聣PNGExperience4AJ01)3, 2010September 30,JuneMay 15,October 6, 20105 Southern69

382

BPA, Transmission, I-5 Corridor Reinforcement Project Map, August 2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents 12 BONNEVILLE POWER57B O

383

BPA, Transmission, I-5 Corridor Reinforcement Project, November 2011 postcard  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents 12

384

BPA, Transmission, I-5 Corridor Reinforcement, scoping meeting boards, 2009  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents 12May 2011 MovingB O N N E

385

West Vero Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation, search Name:Perrine,WestUnion, Ohio:

386

BPA's LiDAR program maps corridor to success  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. Study of SmartRates4

387

BPA, Transmission, I-5 Corridor Reinforcement Project factsheet, December 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. Study of SmartRates4than doubled.

388

Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuels inGoIndianaPennsylvania School Buses Run

389

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New SubstationClean Communities of WesternVail Global Energy Forum Dr.2 P r

390

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New SubstationClean Communities of WesternVail Global Energy Forum Dr.2 P r Finishing

391

MidAtlantic_Corridor_Map091707.pdf | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.eps MoreWSRC-STI-2007-00250 Rev. 05 Oak09 U . SThe

392

Alternative Fuels Data Center: West Virginia CNG Corridor Now Open  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone by E-mail Share AlternativeRight NowAbout Printable

393

Microsoft Word - BPA I-5 Corridor Reinforcement_Scoping Meeting...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recreation, Washington State Energy Facility Site Evaluation Council, Clark Public Utilities, PacifiCorp, and Portland General Electric. Overview of comments heard Open house...

394

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Update November 2012 Preferred alternative The draft EIS describes the proposed project and why it is needed, discusses the environmental impacts the project would create,...

395

Streamlining Transportation Corridor Planning Processess: Freight and Traffic Information  

SciTech Connect (OSTI)

The traffic investigation is one of the most important parts of an Environmental Impact Statement of projects involving the construction of new roadway facilities and/or the improvement of existing ones. The focus of the traffic analysis is on the determination of anticipated traffic flow characteristics of the proposed project, by the application of analytical methods that can be grouped under the umbrella of capacity analysis methodologies. In general, the main traffic parameter used in EISs to describe the quality of traffic flow is the Level of Service (LOS). The current state of the practice in terms of the traffic investigations for EISs has two main shortcomings. The first one is related to the information that is necessary to conduct the traffic analysis, and specifically to the lack of integration among the different transportation models and the sources of information that, in general, reside in GIS databases. A discussion of the benefits of integrating CRS&SI technologies and the transportation models used in the EIS traffic investigation is included. The second shortcoming is in the presentation of the results, both in terms of the appearance and formatting, as well as content. The presentation of traffic results (current and proposed) is discussed. This chapter also addresses the need of additional data, in terms of content and coverage. Regarding the former, other traffic parameters (e.g., delays) that are more meaningful to non-transportation experts than LOS, as well as additional information (e.g., freight flows) that can impact traffic conditions and safety are discussed. Spatial information technologies can decrease the negative effects of, and even eliminate, these shortcomings by making the relevant information that is input to the models more complete and readily available, and by providing the means to communicate the results in a more clear and efficient manner. The benefits that the application and use of CRS&SI technologies can provide to improve and expedite the traffic investigation part of the EIS process are presented.

Franzese, Oscar [ORNL

2010-08-01T23:59:59.000Z

396

STAIRWELL AND CORRIDOR FIRE SAFETY Stairway and corridors are intended to provide a safe and adequate means by which  

E-Print Network [OSTI]

details are listed below to provide a clear understanding of the fire safety guidelines that apply which obstructs utility panels, utility valves, or electrical receptacles. c. Laboratory procedures

de Lijser, Peter

397

Hysteresis and urban rail : the effects of past urban rail on current residential and travel choices  

E-Print Network [OSTI]

Cities are endowed with and accumulate assets based on their unique histories, which in turn define the choice set of the present. These assets range from the natural-sheltered ports, fertile land--to the constructed--concrete ...

Block-Schachter, David

2012-01-01T23:59:59.000Z

398

CBD and South East Light Rail Light rail expansion to transform Sydney  

E-Print Network [OSTI]

CONVENTION EXHIBITION TOWN HALL BONDI JUNCTION MARTIN PLACE WYNYARD WALSH BAY DARLING HARBOUR DULWICH HILL

Blennerhassett, Peter

399

TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup | Department of

400

Nevada potential repository preliminary transportation strategy Study 2. Volume 1  

SciTech Connect (OSTI)

The objectives of this study were to build on the findings of the Nevada Potential Repository Preliminary Transportation Strategy Study 1 (CRWMS M&O 1995b), and to provide additional information for input to the repository environmental impact statement (EIS) process. In addition, this study supported the future selection of a preferred rail corridor and/or heavy haul route based on defensible data, methods, and analyses. Study research did not consider proposed legislation. Planning was conducted according to the Civilian Radioactive Waste Management Program Plan (DOE 1994a). The specific objectives of Study 2 were to: eliminate or reduce data gaps, inconsistencies, and uncertainties, and strengthen the analysis performed in Study 1; develop a preliminary list of rail route evaluation criteria that could be used to solicit input from stakeholders during scoping meetings. The evaluation criteria will be revised based on comments received during scoping; restrict and refine the width of the four rail corridors identified in Study 1 to five miles or less, based on land use constraints and engineering criteria identified and established in Study 2; evaluate national-level effects of routing spent nuclear fuel and high-level waste to the four identified branch lines, including the effects of routing through or avoiding Las Vegas; continue to gather published land use information and environmental data to support the repository EIS; continue to evaluate heavy haul truck transport over three existing routes as an alternative to rail and provide sufficient information to support the repository EIS process; and evaluate secondary uses for rail (passenger use, repository construction, shared use).

NONE

1996-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Safety of high speed guided ground transportation systems: Comparison of magnetic and electric fields of conventional and advanced electrified transportation systems. Final report, September 1992-March 1993  

SciTech Connect (OSTI)

Concerns exist regarding the potential safety, environmental and health effects on the public and on transportation workers due to electrification along new or existing rail corridors, and to proposed maglev and high speed rail operations. Therefore, the characterization of electric and magnetic fields (EMF) produced by both steady (dc) and alternating currents (ac) at power frequency (50 Hz in Europe and 60 Hz in the U.S.) and above, in the Extreme Low Frequency (ELF) range (3-3000 Hz) is of interest. The report summarizes and compares the results of a survey of EMF characteristics (spatial, temporal and frequency bands) for representative conventional railroad and transit and advanced high-speed systems including: the German TR-07 maglev system; the Amtrak Northeast Corridor (NEC) and North Jersey Transit (NJT) trains; the Washington, DC Metrorail (WMATA) and the Boston, MA (MBTA) transit systems; and the French TGV-A high speed rail system. This comprehensive comparative EMF survey produced both detailed data and statistical summaries of EMF profiles, and their variability in time and space. EMF ELF levels for WMATA are also compared to those produced by common environmental sources at home, work, and under power lines, but have specific frequency signatures.

Dietrich, F.M.; Feero, W.E.; Jacobs, W.L.

1993-08-01T23:59:59.000Z

402

Proposed Work Scope for the Rail Topic Group  

Broader source: Energy.gov (indexed) [DOE]

option: A DOE supplement to the Yucca Mountain EIS evaluated the impacts of shipping spent nuclear fuel to Nevada using LWT casks transported on railcars for the first six...

403

Advanced Diesel Common Rail Injection System for Future Emission...  

Broader source: Energy.gov (indexed) [DOE]

passing on to third parties. Approval Data for PC - Diesel at least Euro 3 source: KBA Germany Robert Bosch GmbH reserves all rights even in the event of industrial property...

404

Architecture of the rail : exploring the potential of urban infrastructure  

E-Print Network [OSTI]

This thesis is the pursuit of a sensitivity for the relationship between urban infrastructure and architectural form, an attempt to restore a quality of "publicness" in the urban landscape through the implementation of a ...

Iboshi, Gregory Kenji

1994-01-01T23:59:59.000Z

405

Integrated hydraulic cooler and return rail in camless cylinder head  

DOE Patents [OSTI]

An engine assembly may include a cylinder head defining an engine coolant reservoir, a pressurized fluid supply, a valve actuation assembly, and a hydraulic fluid reservoir. The valve actuation assembly may be in fluid communication with the pressurized fluid supply and may include a valve member displaceable by a force applied by the pressurized fluid supply. The hydraulic fluid reservoir may be in fluid communication with the valve actuation assembly and in a heat exchange relation to the engine coolant reservoir.

Marriott, Craig D. (Clawson, MI); Neal, Timothy L. (Ortonville, MI); Swain, Jeff L. (Flushing, MI); Raimao, Miguel A. (Colorado Springs, CO)

2011-12-13T23:59:59.000Z

406

Evaluating the robustness of crew schedules for rail transit systems  

E-Print Network [OSTI]

Crew scheduling has traditionally been the last step in the process of service planning, and it has traditionally aimed at minimizing manpower costs because it was assumed that the crew schedule does not directly impact ...

Ravichandran, Harshavardhan

2013-01-01T23:59:59.000Z

407

Microsoft Word - Rail Topic Group Conference Call Summary_May...  

Broader source: Energy.gov (indexed) [DOE]

Kevin Blackwell (Federal Railroad Administration, Peter Bolton (Booz-Allen and Hamilton), Robert Fronczak (American Association of Railroads), Roger Mulder (Texas Energy...

408

METRA -Metropolitan Rail Corporation Chicago, Illinois Posting Date  

E-Print Network [OSTI]

includes approximately 400 employees classified as journeymen or apprentice electricians, machinist, Carmen

Bustamante, Fabi谩n E.

409

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Office of Environmental Management (EM)

September 11, 1998 Meeting June 22, 1998 Meeting May 27, 1998 Meeting November 3, 1997 Meeting September 18, 1997 Meeting More Documents & Publications TEC Working Group...

410

British Rail's InterCity 125 and 225  

E-Print Network [OSTI]

diesel engine was upgraded in output by the addition of a turbocharger, which later became a source of maintenance problems--bearing

Barnett, Roger

1992-01-01T23:59:59.000Z

411

200506 President's Report An award-winning rail transporta-  

E-Print Network [OSTI]

units through partner- ships with Piedmont Housing Alliance and Habitat for Human- ity. The second eco. The expansion is scheduled for com- pletion in the spring of 2008. The Cover Students build the first eco- MOD, the ecoMOD project is integrated in the school's cur- riculum. Teams of architecture, engineering

Acton, Scott

412

HIGH SPEED RAIL COSTS, BENEFITS, AND FINANCING RAYMOND H. ELLIS  

E-Print Network [OSTI]

a Record of Decision (ROD) based on the Final Environmental Impact Statement (FEIS) 颅 Unable to find

Bustamante, Fabi谩n E.

413

Does rail have a place in a rebuilt Christchurch?  

E-Print Network [OSTI]

global green economy trends... 1 In 2008 `peak fossil fuel power investment' occurred: global renewable power investment higher than fossil fuel power investment for first time. Now 2:1... 2 In 2004 `peak oil production' occurred...no increase in production for 5 years... end of cheap oil. 4 In 2008

Hickman, Mark

414

Delay impacts of light rail transit grade crossings  

E-Print Network [OSTI]

with the cross i n g control operating independently of the other parts of the signal system. The LRT vehicles recei ve unconditional priority at a 1 1 times. The LRT system in this anal ysi s was depicted as operating on semi -exclusive right-of-way. Median... . 25 Figure 9. Isolated Crossing-Effect of Crossing Clearance Time . 26 Figure 10. Isolated Crossing-Effect of Roadway Cross-Section . . . 28 Figure 11. Isolated Crossing-Delay per Vehicle vs. Crossing Volume-to-Capacity Ratio-Scatter Plot . 30...

Cline, James Curtiss

1986-01-01T23:59:59.000Z

415

Crude Oil Movements of Crude Oil by Rail  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User

416

Naval Spent Fuel Rail Shipment Accident Exercise Objectives  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2Energy Second Quarter Report1-93 JulyDepartment

417

QER Public Meeting in Chicago, IL: Rail, Barge, Truck Transportation |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | DepartmentLoans | Department of Energy20

418

Rail Networks Are Getting Smarter | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNewsCenter forQualityRSSRadiological

419

Rail Transportation of Crude Oil in North America  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNewsCenter forQualityRSSRadiologicalreports U.S.

420

Moab Resumes Rail Shipments After Rockslide | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiatives InitiativesShippingHowTheMission MissionMissionRidge |Moab

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Agenda: Rail, Barge, Truck Transportation | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South ValleyASGovLtr.pdfAboutSheet,ProposedEnergySITING Agenda:Energy

422

The Environmental Injector: Beyond Common Rail and Hydraulic  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage 禄of EnergyThe Energy Department Feeds Families The EnergyIntensificatiion |

423

Rail Topic Group Meeting Summary Wednesday January 20, 1999  

Broader source: Energy.gov (indexed) [DOE]

U.S. DOT, FRA Carlisle SmithOhio Public Utilities Commission Ralph SmithU.S. DOE, Carlsbad Area Office David SnyderU.S. DOT, FRA Uldis VanagsNE HLRW Task Force James...

424

Minnesota Comprehensive Statewide Freight and Passenger Rail Plan  

E-Print Network [OSTI]

demand Life Sciences Recognized world leader in medical equipment and advanced healthcare Energy Sources: Bureau of Economic Analysis and Bureau of Labor Statistics. #12;4 Key Minnesota Industries Long; uncertainties for dairy Paper and Wood Expansions at existing paper facilities; Exports balancing low domestic

Minnesota, University of

425

Microsoft PowerPoint - Rail_Kneitel [Compatibility Mode  

Office of Environmental Management (EM)

created procedure for BNL shipments - LIRR sends Safety Inspector to walk down each train * BNL makes notifications in accordance with protocols * Shipments made on weekends...

426

Advanced Diesel Common Rail Injection System for Future Emission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartment of EnergyAdministrative RecordsBiofuelseffort

427

Microsoft PowerPoint - Rail_Kneitel [Compatibility Mode]  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007NavalMelvin G. Williams,UseNWTRBOverviewMeeting: New1

428

Enhancing Railroad Hazardous Materials Transportation Safety Rail Routing |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOEElectricalon Clean DevelopmentCorporation -|Enhanced

429

TEC Working Group Topic Groups Rail Archived Documents | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION AT

430

TEC Working Group Topic Groups Rail Conference Call Summaries Inspections  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup | Department of Energy

431

TEC Working Group Topic Groups Rail Conference Call Summaries | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup | Department ofof

432

TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup | Department

433

TEC Working Group Topic Groups Rail Key Documents Planning Subgroup |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup | DepartmentDepartment of

434

TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup | DepartmentDepartment

435

TEC Working Group Topic Groups Rail Meeting Summaries | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION ATSubgroup |

436

Conventional Gasoline Movements by Tanker, Pipeline, Barge and Rail between  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import96 4.87CBECS Public Use Data CBECSYearThousandPAD

437

Remarks on Rail Transportation of Energy Resources John R. Birge  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |Regulation Services System:Affairs, to the Beijing Energy Club|Accesson

438

Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel Engine |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject:Groundto Apply forInstitute Mission&Department of

439

Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructure |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe U.S. Department-2023 Idaho4Fuel ConsumptionproblemImpacts

440

Proposed Work Scope for the Rail Topic Group  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartment ofColumbus HTS PowerAdministered by28518 Vol. 77, No. 9431548234

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Naval Spent Fuel Rail Shipment Accident Exercise Objectives | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15, 2010 Printing andNancyFairbanksNaturalDecreeCouncilEnergy

442

Shipping Radioactive Waste by Rail from Brookhaven National Laboratory |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational Energy Agency |AwardJohnson, Steve5,

443

Acknowledgments: UNEP/WMO, IIASA, JRC, US EPA, SEI, Scripps, Middlebury, U York,  

E-Print Network [OSTI]

(particle filters+) 颅 Replacing coal in residential stoves 颅 Replacing residential wood burning in Industrialized countries 颅 Clean-burning cookstoves in developing countries 颅 Modern brick kilns 颅 Modern coke + Sri Lanka South East Asia China Rice paddies Livestock manure Wastewater Municipal waste Coal mines

444

EIS-0433-S1: Keystone XL Pipeline SEIS (Montana, South Dakota, and Nebraska)  

Broader source: Energy.gov [DOE]

This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new substations and the expansion of six existing substations.

445

PreSEIS: A Neural Network-Based Approach to Earthquake Early Warning for Finite Faults  

E-Print Network [OSTI]

), the Californian ElarmS (Allen and Kanamori, 2003), or the Romanian EEW system (Wenzel et al., 1999; B枚se et al

Heaton, Thomas H.

446

Controlling SEI Formation on SnSb-Porous Carbon Nanofibers for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Improved Na Ion Storage. Abstract: Porous carbon nanofiber (CNF)-supported tin-antimony (SnSb) alloys is synthesized and applied as sodium ion battery anode. The...

447

Institutional Reports and Analyses http://registrar.osu.edu/faculty/sei/faqs.asp  

E-Print Network [OSTI]

. While the application was used on a relatively small scale, steps were taken to implement this Web to evaluate their instructors and courses. An upgrade to ASP.NET, which provided additional functionality

Hayden, Nancy J.

448

E-Print Network 3.0 - aleyrodidae em seis Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ulm Collection: Mathematics 22 ORANGE SPINEY WHITEFLY AND ITS PARASITOIDS IN PALAU 21PROC. HAWAIIAN ENTOMOL. SOC. (2006) 38:2125 Orange Spiny Whitefly, Aleurocanthus...

449

Microsoft PowerPoint - DRAFT SPD SEIS Public Presentation_FINAL...  

National Nuclear Security Administration (NNSA)

for Pit Disassembly and Conversion for Pits and Metal at SRS and LANL Metal MOX Fuel Commercial Nuclear Storage of Pits at Pantex Plant Metal MOX Fuel Fabrication at SRS...

450

Theory of SEI Formation in Rechargeable Batteries: Capacity Fade, Accelerated Aging and Lifetime Prediction  

E-Print Network [OSTI]

Cycle life is critically important in applications of rechargeable batteries, but lifetime prediction is mostly based on empirical trends, rather than mathematical models. In practical lithium-ion batteries, capacity fade ...

Pinson, Matthew Bede

451

EIS-0433-S1: Keystone XL Pipeline SEIS (Montana, South Dakota, and  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatement |This EIS evaluatesof EnergyNebraska) |

452

Microsoft PowerPoint - Final CLWR SEIS PUBLIC SCOPING PRESENTATION oct 20 [Compatibility Mode]  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronic Input Options Gary L.Martyn Impact

453

WIPP SEIS-II - Comment Response Supplement, Volume I (Part 1 of 37)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApprovedRegionalDOE WIPPForI

454

WIPP SEIS-II - Comment Response Supplement, Volume II (Part 1 of 24)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApprovedRegionalDOE WIPPForIII

455

WIPP SEIS-II - Volume I, Chapters 1-6 (Part 1 of 7)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApprovedRegionalDOEI Chapters

456

WIPP SEIS-II - Volume II, Appendices (Part 1 of 11)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApprovedRegionalDOEI ChaptersII

457

WIPP SEIS-II - Volume III, Comment Response Document (Part 1 of 8)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApprovedRegionalDOEI

458

SEIS for the Production of Tritium in a Commercial Light Water Reactor |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 ResourceAwards SAGE Awards ,# , onLightThePrices andSEE HOW

459

Microsoft PowerPoint - xxDraft SEIS PUBLIC MEETING PRESENTATION 9 sep 2014 [Compatibility Mode]  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of the Yucca MountainSourceUsers

460

Ionic Liquid-Enhanced Solid State Electrolyte Interface (SEI) for Lithium  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared LandResponsesIon/Surface Reactions and Ion Soft-Landing.OxfordSulfur

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Controlling SEI Formation on SnSb-Porous Carbon Nanofibers for Improved Na  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New SubstationCleanCommunity2Workshops01Controlling Graphene's

462

Fixed Link between Labrador and Newfoundland Pre-feasibility Study  

E-Print Network [OSTI]

........................................................32 Rail Tunnel........................................................35 HVDC Cabling Requirements

deYoung, Brad

463

E-Print Network 3.0 - atlantic flight corridor Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

summertime... haze formation in the mid-Atlantic region. The mass frac- tion of ammoniated sulfate (SO4 2 Source: Dickerson, Russell R. - Department of Atmospheric and Oceanic...

464

Microsoft PowerPoint - Columbia_River_Corridor_Rev_2_v2.ppt ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

install additional wells l u m b i a R . add t o a e s - 100 N Area (contain strontium-90) Drill injection, monitoring wells to support apatite barrier to support apatite...

465

BUILDING AN INCLUSIVE CONNECTIVE CORRIDOR OF INNOVATIVE AND SUSTAINED PARTNERSHIPS opinion mining  

E-Print Network [OSTI]

: Postdoctoral fellow, Kellogg School of Management, Northwestern University 2006 Ph.D. Library and Information Technology, Chinese Academy of Sciences 1996 B.E. Computer Science, University of Science and Technology by engaging consumers in large- scale participatory design using a Pictionary-like social mobile drawing game

Doyle, Robert

466

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network [OSTI]

Environment. Estimation of Nitrogen Dioxide Concentrationsmatter, ozone, nitrogen dioxide and sulfur dioxide - Globalnitrate particles and nitrogen dioxide can reduce visibility

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

467

BPA guide to finding your property online - I-5 Corridor Reinforcement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

will zoom in to the address you provided, allowing you to see if proposed locations of transmission towers and access roads on BPA's preferred alternative are near the property....

468

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington  

Broader source: Energy.gov [DOE]

This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new rights-of-way.

469

BPA I-5 Corridor Reinforcement_Scoping Meeting Summary_Vancouver...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

owners that harvest timber on their land had specific concerns about impacts to this source of income, including compensation and increased off-road vehicle use on access...

470

Technical Basis for Radiological Workplace Air Monitoring and Sampling for the River Corridor Project 300 area  

SciTech Connect (OSTI)

This report documents the technical basis by which the workplace air monitoring and sampling program is operated in the 324 and 327 Buildings.

MANTOOTH, D.S.

2000-01-17T23:59:59.000Z

471

Rapid Prototyping of Urban River Corridors Using 3D Interactive, Real-time Graphics  

E-Print Network [OSTI]

of Sheffield, which then proceeded through several levels of detail using SketchUp, until they were finalised

Romano, Daniela

472

I-5 CorrIdor reInforCement ProjeCt B  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

records. This project requires close collaboration with operations managers of major timber companies, county surveyors, public works directors, geographic information system...

473

Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents Perceptions  

E-Print Network [OSTI]

and perception of biodiversity and ecology is their activecommunity and perception of area ecology: individual-levelOutcomes 2 & 3: Perception of Area Ecology & Creek抯 Role in

Stokenberga, Aiga; Sen, Arijit

2013-01-01T23:59:59.000Z

474

The Effect of the Recovery Act on the River Corridor Closure Project: Lessons Learned  

SciTech Connect (OSTI)

This summary report provides a high-level lessons learned by WCH of the impact to its project performance. The context is limited to the WCH project alone.

Mackay, S. M.

2012-07-31T23:59:59.000Z

475

Yes/No COMMENTS Containment zones and associated corridors to be separated  

E-Print Network [OSTI]

on the containment barrier are to include effective pest control and security. 3.2.1 CBSG Ref # Yes/No COMMENTS Doors to be provided, as determined by an LRA. 3.7.1 Process equipment, closed systems, and other primary containment with function. 3.4.6 CBSG Ref # Yes/No COMMENTS HVAC system to provide sufficient air changes per hour (AC

Kavanagh, Karen L.

476

Biomimetic visual navigation in a corridor: to centre or not to centre?*  

E-Print Network [OSTI]

}@laps.univ-mrs.fr KEYWORDS AFCS (Automatic Flight Control System), MAV (Micro- Air Vehicle), Urban canyon navigation, Optic Flight Control System (AFCS) for Micro-Air Vehicle (MAV) obstacle avoidance, we introduce a vision based degree of freedom (yaw ). We show the feasibility of an OF regulator that maintains the lateral Optic

Jirsa, Viktor

477

Mitigating the Social and Environmental Impacts of Multimodal Freight Corridor Operations at Southern California Ports  

E-Print Network [OSTI]

SPBP freight traffic, air pollution, and the health of localSPBP freight traffic, air pollution, and the health of localhealth impact assessment to quantitatively assess the characteristics of the populations bearing the brunt of air pollution

Recker, Will W

2008-01-01T23:59:59.000Z

478

Vehicle Technologies Office Merit Review 2014: Lake Michigan Corridor Alternative Fuel Implementation Initiative  

Broader source: Energy.gov [DOE]

Presentation given by Institute of Gas Technology at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Lake Michigan...

479

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network [OSTI]

used in the U.S. are diesel-electric locomotives.They use a diesel engine to power electric motors that driveElectric Transportation Systems and Electro-Motive Diesel (

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

480

A CorridorCentric Approach to Planning Electric Vehicle Charging Infrastructure  

E-Print Network [OSTI]

and around the world 颅 Plugin EV sales are expected o account for 0.3 percent of all cars sales by 2015. (Ohnishi, 2008) #12;Introduction 路 Why electric vehicles? 颅 EV are energy efficient: with a welltowheel efficiency around 1.15 km/mJ, Evs are almost as twice as efficient as Toyota Prius (Romm, 2006). 颅 Electric

Nagurney, Anna

Note: This page contains sample records for the topic "rail corridor seis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder City, Nevada  

Broader source: Energy.gov [DOE]

The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in...

482

Utilisation de la tldtection pour la caractrisation des corridors fluviaux : exemples d'applications et enjeux  

E-Print Network [OSTI]

'applications et enjeux actuels Characterisation of alluvial plains by remote sensing: cases studies and current 茅chelles spatiales et temporelles, qu'il s'agisse de tron莽ons fluviaux de plusieurs dizaines de kilom猫tres sensing. The spatial resolution of the sensors must be adapted to the detection of river and flood plain

Boyer, Edmond

483

BPA, Transmission, non-wires measures for the I-5 Corridor Reinforceme...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

efficiency measures using insulation and more efficient appliances and cooling systems Demand response at the local level, such as thermostat controls, to better regulate energy...

484

Habitat connectivity study of the I-25 and US 85 corridors, Colorado  

E-Print Network [OSTI]

edge of the Great Plains Palouse Dry Steppe ecoregions. Aedge of the Great Plains Palouse Dry Steppe eco-regions.

Henke, Robert J.; Cawood-Hellmund, Paul; Sprunk, Toby

2001-01-01T23:59:59.000Z

485

The effects of corridor characteristics on motorists' decisions to divert in resonse to time saving messages  

E-Print Network [OSTI]

prominent negative reasons were: (1) anticipated congestion on LBJ, (2) travel distance to the DNT, and (3) traffic lights on Greenville Avenue. ACKNOWLEDGMENT The research presented in this thesis was conducted as part of a project sponsored... at Various Levels of Time Savings to Greenville Avenue and to Dallas North Tollway Percentage of Diversion at Various Levels of Time Savings at Lyndon B. Johnson Freeway and at. Northwest Highway Exits 47 Percentage of Diversion at Various Levels...

Robbins, Charles John

2012-06-07T23:59:59.000Z

486

Validating Predicted Rural Corridor Travel Times from an Automated License Plate Recognition System: Oregon's Frontier Project  

E-Print Network [OSTI]

: Oregon's Frontier Project Robert L. Bertini Department of Civil & Environmental Engineering Portland recognition颅the Frontier Travel Time project. As part of the Frontier project, the Oregon Department, Utah, and Oregon) have formed the Frontier pooled-fund study which has implemented and tested ITS

Bertini, Robert L.

487

Validating Predicted Rural Corridor Travel Times from an Automated License Plate Recognition System: Oregon's Frontier  

E-Print Network [OSTI]

: Oregon's Frontier Project Robert L. Bertini, Matthew Lasky, and Christopher M. Monsere Abstract automated license plate recognition颅the Frontier Travel Time project. As part of the Frontier project, Montana, Wyoming, Texas, Washington, Utah, and Oregon) have formed the Frontier pooled-fund study which

Bertini, Robert L.

488

Urban/industrial pollution for the New York CityWashington, D. C., corridor, 19961998  

E-Print Network [OSTI]

. Providing independent verification of CO and PCE emissions inventories Diana H. Barnes, Steven C. Wofsy these results to test the quality of county-level and national source emission inventories for these two gases. The EPA carbon monoxide emission county-level inventories and the McCulloch and Midgley sales

489

E-Print Network 3.0 - agv corridor navigation Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

major aspects... these modules will be presented in the following sections. Figure 1: Control and Navigation of an Outdoor AGV... on 12 and is as shown in Figure 2. Figure...

490

I-5 Corridor Reinforcement Project Fact Sheet -- Keeping the local lights on  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLCBasics Hydropower BasicsDepartment ofPublicApril

491

EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatement |This EISCowlitz and Clark Counties,

492

From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Electrical Resistivityconnie0:59 PM I am opposed to the9:0505:34

493

From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Electrical Resistivityconnie0:59 PM I am opposed to

494

From: Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Electrical Resistivityconnie0:59 PM I am opposedAustinCarl

495

From: Carol Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Electrical Resistivityconnie0:59 PM I am opposedAustinCarlJohnson

496

From: Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Electrical Resistivityconnie0:59 PMWednesday,Tuesday,No

497

Report to Congress: Corridors and Rights-of-Way on Federal Lands |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department of Energy on Separate DisposalDepartment of

498

C. A. Reeb L. Arcangeli B. A. Block Structure and migration corridors in Pacic populations  

E-Print Network [OSTI]

with a specialized eye muscle known as the heater organ (Carey 1982). This heat-generating tissue allows them and distribution is generally associated with surface waters >18 掳C and / Accepted: 4 February 2000 Abstract The sword庐sh Xiphias gladius is a migratory oceanic species distributed

Hawai'i at Manoa, University of

499

Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents Perceptions  

E-Print Network [OSTI]

Two East Bay Urban Stream Restoration Projects: Codornicesfunding for river and stream restoration projects, becausepreservation, and restoration of urban streams and their

Stokenberga, Aiga; Sen, Arijit

2013-01-01T23:59:59.000Z

500

Mitigating the Social and Environmental Impacts of Multimodal Freight Corridor Operations at Southern California Ports  

E-Print Network [OSTI]

at Southern California Ports. Presented at the 11 th WorldFreeway approaching the ports Figure 2. Overviews of Studyat Southern California Ports ABSTRACT The San Pedro Bay

Recker, Will W

2008-01-01T23:59:59.000Z