Powered by Deep Web Technologies
Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

Not Available

1993-11-05T23:59:59.000Z

2

Great Plains Coal Gasification project. Quarterly technical progress report fourth quarter, 1985  

SciTech Connect

The operations of the Great Plains Gasification plant are reported for the fourth quarter of 1985. Contents include the following: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications - 1985; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical service; (12) environmental; and (13) quality assurance/quality control activities.

Not Available

1986-01-31T23:59:59.000Z

3

Fourth Quarter FY 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2009 1 December 2009 1 Fourth Quarter FY 2009 December 1, 2009; Issue No. 61 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 8) DOE Begins Online Posting of Categorical Exclusion Determinations The Department of Energy (DOE) is now posting most of its categorical exclusion (CX) determinations on the web under a policy that went into effect November 2, 2009. In establishing the policy, Deputy Secretary Daniel B. Poneman referred to President Obama's commitment to "creating an unprecedented level of openness in Government," including by posting information online. "Such openness is especially important when the information relates to the Department's

4

(Great Plains Coal Gasification project): Quarterly environmental, safety, medical, and industrial hygiene report, fourth quarter 1986  

SciTech Connect

Contents of this quarterly report include: (1) environmental monitoring program; (2) supplemental environmental program; (3) quality assurance/quality control activities; (4) schedule of activities for next reporting period; (5) safety; (6) medical services; and (7) industrial hygiene. The environmental monitoring program covers: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. Supplemental environmental program includes: performance survey; toxicity screening study; data base management system; epidemiology; and contingency program.

Not Available

1987-01-01T23:59:59.000Z

5

Great Plains Coal Gasification Project. Quarterly environmental report, fourth quarter 1985  

Science Conference Proceedings (OSTI)

Environmental monitoring, supplemental environmental programs and quality assurance/quality control activities are covered in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; and environmental incident summary. The supplemental environmental program covers: performance survey; wastewater control and steam generation systems; sulfur control; tar reinjection outage; gasifier effluent control systems; toxicity screening study; toxicant characterization; data base management system; workplace characterization; fugitive emissions; epidemiology; atmospheric program; effects of cooling tower effluents on terrestial ecosystems and contingency program. 14 figs., 66 tabs.

Not Available

1986-01-01T23:59:59.000Z

6

Third and Fourth Quarter Financial Guidance | National Nuclear...  

National Nuclear Security Administration (NNSA)

Financial Guidance Home > About Us > Our Operations > Acquisition and Project Management > Office of Financial Field Management > Third and Fourth Quarter Financial Guidance...

7

Natural Gas Imports and Exports - Fourth Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports...

8

Great Plains Coal Gasification Project, Mercer County, North Dakota. Quarterly technical and environmental report, fourth quarter, 1983. [Great Plains, Mercer County, North Dakota  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet Great Plains Gasification Associates' full gas production date. Gasification Plant: detailed engineering in the Contractors' home office was completed in the fourth quarter. The remaining engineering tasks, which include field support activities and special projects, will be performed by the Contractors' Field Engineering Group. A substantial amount of construction progress was achieved during the fourth quarter. Although the Plant's construction activities are still slightly behind schedule, it is currently forecasted that the construction schedule will be regained by the end of June 1984. Start-Up operations are continuing at a rapid pace. The current emphasis is on system turnover and commissioning activities. The environmental permitting for the construction phase is complete. Freedom Mine: mine development activities remain on schedule.

Not Available

1983-01-01T23:59:59.000Z

9

DOE IGCC Project. Fourth quarterly report, [October 1, 1993--December 31, 1993  

SciTech Connect

We have previously reported a decision to move the simple cycle commercial operation to a date coincident with the July 1, 1996 Integrated Gasification Combined Cycle (IGCC) commercial operation date. This necessitated a major rescheduling of the engineering and construction efforts to ensure a totally coordinated plan. This rescheduling was completed in mid October 1994 and resulted in an integrated engineering and construction schedule. The major effort in the fourth quarter of 1994 centered around equipment procurement to support the new integrated plan. This is required so that sufficient engineering details will be available to generate construction bid packages with at least 90% completed effort. During the reporting period 43 material requisitions (MR`s) were issued for bids. Also during-the reporting period a total of 14 purchase orders were issued including the generator step-up transformer and major columns and vessels. Bid packages were prepared, for bid submittal in January 1994, for a turnkey sulfuric acid plant and for the transportation/erection of the radiant syngas cooler (RSC). The original concept was for MAN GHH to deliver the RSC as part of their design and fabrication contract. However, in an attempt to improve coordination for the overall handling of this significant piece of equipment, it was decided to remove the transportation from MAN GHH`s scope of work and include the transportation with the RSC erection contract. Initial indication from prospective bidders and Bechtel are that lower total costs will be achieved in addition to the expected improved coordination.

1994-02-23T23:59:59.000Z

10

Great Plains coal-gasification project Mercer County, North Dakota quarterly technical and environmental report. Fourth quarter, 1982  

SciTech Connect

Engineering activity was essentially on schedule for the plant with no major reasonably forseeable problems which could impact the scheduled start up date for full production. Major engineering efforts currently in progresss at the end of the fourth qquarter include the completion of isometric piping drawings and the completion of the design and release of electrical instrumentation. Engineering support for the subcontracting program is also a high priority. Construction activities accomplished work on a wide range of work fronts considering the time of year. Although some deliveries of equipment are impacting some construction progress, increased expeditiing efforts should remedy this problem in the future. Start Up Planning is progressing at a steady pace. Interfacing between forces and operating personnel is now occurring on a regular basis. Overall, activities remain on schedule to meet start up and coal delivery dates as well as the completion of the pipeline.

Not Available

1982-01-01T23:59:59.000Z

11

Third and Fourth Quarter Financial Guidance | National Nuclear...  

National Nuclear Security Administration (NNSA)

Quarter Financial Guidance Third and Fourth Quarter Financial Guidance OFFM FY 2010 Financial Statements, Performance Accountability Reporting Guidance (PDF, 64KB)...

12

Short-term energy outlook. Quarterly projections, second quarter 1996  

Science Conference Proceedings (OSTI)

The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

NONE

1996-04-01T23:59:59.000Z

13

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2009 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

14

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012

15

NEPA Lessons Learned Quarterly Report, Fourth Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 Fourth Quarter FY 2006 December 1, 2006; Issue No. 49 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 6) Scoping Process Underway for Two Yucca Mountain EISs The Department of Energy (DOE) recently initiated public scoping for two EISs related to Yucca Mountain, the Nation's proposed repository for disposal of commercial

16

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and  

Open Energy Info (EERE)

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Authors Ormat Technologies and Inc. Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Citation Ormat Technologies, Inc.. Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results [Internet]. [updated 2013;cited 2013]. Available from: http://www.ormat.com/news/latest-items/ormat-technologies-reports-2012-fourth-quarter-and-year-end-results

17

Fossil Energy Today - Fourth Quarter, 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Fossil Energy Today - Fourth Quarter, 2012 Topics In This Issue.... National Sequestration Education Center Opens in Illinois Environment, Security, Safety & Health in the Office...

18

Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

19

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2010

20

Short-term energy outlook. Quarterly projections, Third quarter 1995  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

NONE

1995-08-02T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First

22

Financial News for Major Energy Companies, Fourth Quarter 2005  

Gasoline and Diesel Fuel Update (EIA)

Fourth Quarter 2005 Fourth Quarter 2005 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $28.7 billion on revenues of $298.4 billion (i.e., 9.6 cents of net income per dollar of revenue) during the fourth quarter of 2005 (Q405). The level of net income for Q405 was 43 percent higher than in the fourth quarter of 2004 (Q404) (Table 1). Net income for Q405

23

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update, July/September 2004, No.4  

DOE Green Energy (OSTI)

Fourth issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project

Not Available

2004-10-01T23:59:59.000Z

24

Lessons Learned Quarterly Report, Fourth Quarter FY 2001 (12/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2001 December 5, 2001; Issue No. 29 CEQ Chair Describes Goals, Supports NEPA Principles The Council on Environmental Quality (CEQ) wants Federal agencies to weave environmental considerations into everyday business, as opposed to conducting NEPA compliance as a distinct project to fend off lawsuits. Recently appointed CEQ Chair James L. Connaughton (Lessons Learned Quarterly Report, June 2001, page 12) described this and other key CEQ goals at a September 21, 2001, meeting with Federal agency NEPA Contacts. Mr. Connaughton made it clear that this administration supports NEPA’s principles “as much as all previous administrations.” In this connection, he referred to

25

Natural Gas Imports and Exports - Fourth Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 More Documents & Publications FE DOCKET NO. 11-59-LNG Summary of LNG Export Applications LNG Annual Report - 2011...

26

Coal air turbine {open_quotes}CAT{close_quotes} program invention 604. Fourth quarter project report, July 1995--September 1995  

SciTech Connect

A coal air turbine `CAT` generates electric power and heat from coal combustion. The purpose of this project is the conceptual design of a `CAT` plant, and to make a comparison of the capital cost and and cost of power and steam from the `CAT` plant with power produced by alternate plants at the same site. Three configurations investigated include: condensing plant utilizing coal fuel and a condenser tower, or river, for cooling; a cogeneration plant utilizing coal and a steam turbine; and a cogeneration plant utilizing steam export and injection with waste coal fuel.

Foster-Pegg, R.W.

1995-10-31T23:59:59.000Z

27

Natural gas imports and exports. Fourth quarter report, 1998  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

28

Short-term energy outlook: Quarterly projections. Second quarter 1995  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

NONE

1995-05-02T23:59:59.000Z

29

US Energy Industry Financial Developments, 1993 fourth quarter, April 1994  

Science Conference Proceedings (OSTI)

This report traces key financial trends in the US energy industry for the fourth quarter of 1993. Financial data (only available for publicly-traded US companies) are included in two broad groups -- fossil fuel production and rate-regulated electric utilities. All financial data are taken from public sources such as energy industry corporate reports and press releases, energy trade publications, and The Wall Street Journal`s Earnings Digest; return on equity is calculated from data available from Standard and Poor`s Compustat data service. Since several major petroleum companies disclose their income by lines of business and geographic area, these data are also presented in this report. Although the disaggregated income concept varies by company and is not strictly comparable to corporate income, relative movements in income by lines of business and geographic area are summarized as useful indicators of short-term changes in the underlying profitability of these operations. Based on information provided in 1993 fourth quarter financial disclosures, the net income for 82 petroleum companies -- including 18 majors -- was unchanged between the fourth quarter of 1992 and the fourth quarter of 1993. An 18-percent decline in crude oil prices resulted in a deterioration of the performance of upstream (oil and gas production) petroleum companies during the final quarter of 1993. However, prices for refined products fell much less than the price of crude oil, resulting in higher refined product margins and downstream (refining, marketing and transport) petroleum earnings. An increase in refined product demand also contributed to the rise in downstream income.

Not Available

1994-04-14T23:59:59.000Z

30

Short-term energy outlook. Quarterly projections, third quarter 1996  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

NONE

1996-07-01T23:59:59.000Z

31

Fossil Energy Today - Fourth Quarter, 2011  

Energy.gov (U.S. Department of Energy (DOE))

Here are just some of the stories featured in this issue: Industrial Carbon Capture, Storage Project Begins Construction; A New Path Forward: CCUS; FE R&D: A Legacy of Benefit; and NETL Helps Develop Improved Coronary Stents for Heart Patients.

32

NEPA Lessons Learned Quarterly Report, Issue No. 41; Fourth Quarter FY 2004; December 1, 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 1 4 1 The EIS Comment-Response Process Guidance Issued; see page 9 Putting the Web to Work for NEPA National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2004 December 1, 2004; Issue No. 41 LESSONS LEARNED LEARNED LESSONS (continued on page 4) "What's your e-mail address? Do you have a Web site?" These are common questions in

33

Short-term energy outlook. Quarterly projections, first quarter 1996  

DOE Green Energy (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

NONE

1996-02-01T23:59:59.000Z

34

Environmental Biosciences Program Fourth Quarter Report  

SciTech Connect

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene (TCE), polychlorinated biphenyls (PCBs), asbestos and low-dose ionizing radiation. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making.

Lawrence C. Mohr, M.D.

2004-06-30T23:59:59.000Z

35

Natural gas imports and exports; Fourth quarterly report, 1993  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the fourth quarter of 1993 (October--December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During 1993, data indicates gas imports grew by about 10 percent over the 1992 level (2328 vs. 2122 Bcf), with Canadian and Algerian imports increasing by 8 and 82 percent, respectively. During the same time period, exports declined by 41 percent (144 vs. 243 Bcf). Exports to Canada decreased 47 percent from the 1992 level (50 vs. 95 Bcf) and exports to Mexico decreased by 60 percent (38 vs. 95 Bcf).

NONE

1993-12-31T23:59:59.000Z

36

Short-term energy outlook, Quarterly projections. Third quarter 1993  

Science Conference Proceedings (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

NONE

1993-08-04T23:59:59.000Z

37

Short-term energy outlook: Quarterly projections, second quarter 1997  

Science Conference Proceedings (OSTI)

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

NONE

1997-04-01T23:59:59.000Z

38

Renewable Energy Finance Tracking Initiative (REFTI): Snapshot of Recent Geothermal Financing Terms, Fourth Quarter 2009 - Second Half 2011  

Science Conference Proceedings (OSTI)

This report is a review of geothermal project financial terms as reported in the National Renewable Energy Laboratory's Renewable Energy Finance Tracking Initiative (REFTI). The data were collected over seven analysis periods from the fourth quarter (Q4) of 2009 to the second half (2H) of 2011.

Lowder, T.; Hubbell, R.; Mendelsohn, M.; Cory, K.

2012-09-01T23:59:59.000Z

39

Silicon materials task of the low cost solar array project (Part 2). Fourth quarterly report, July 1, 1976--September 30, 1976  

DOE Green Energy (OSTI)

During this quarter we have completed the growth of all contract-required Czochralski and silicon dendritic web crystals. The chemical analysis of all the Czochralski ingots is also finished. Preliminary mass spectroscopic evaluation of metal-doped web samples grown at 1.3 cm/min indicates that the effective distribution coefficients for Cu, Ni, and Cr all increase with growth rate as anticipated. For chromium the increase is almost 100 fold compared to the effective k for Czochralski ingots grown at 7.5 cm/hr. PCD lifetime measurements were completed on 46 ingots. The correlation between solar cell performance and PCD lifetime appears valid for all processed wafers except those containing Ti which give lower cell efficiency than would be predicted on the basis of lifetime alone. Solar cell measurements were completed in all but a few of the ingots grown during the contract. In particular, data has now been obtained on the second set of multiply-doped samples containing the impurity combinations Zr/Ti, Cr/Ni, and Cr/Cu/Ni. As in the case of ingots containing only Ti, the Zr/Ti sample shows severely degraded cell efficiency, only about 26% of the baseline. The Cr/Ni and Cr/Cu/Ni samples show efficiencies of 81 and 72% of baseline efficiency reflecting the small effects of Cu and Ni on cell performance and the stronger effect of Cr.

Hopkins, R.H.; Davis, J.R.; Rai-Choudhury, P.; Blais, P.D.; McHugh, J.P.; McCormick, J.R.

1976-01-01T23:59:59.000Z

40

NEPA Lessons Learned Quarterly Report; Issue No. 37; Fourth Quarter FY 2003 (12/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2003 December 2003 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2003 December 1, 2003; Issue No. 37 LESSONS LEARNED LEARNED LESSONS What's Next? CEQ Seeks More Input on Task Force Recommendations continued on page 3 NEPA practitioners, agencies, special interest groups, and the general public are reacting to recommendations intended to improve and modernize NEPA implementation presented in the NEPA Task Force Report to the Council on Environmental Quality: Modernizing NEPA Implementation, issued in September 2003. Through a series of meetings and regional roundtable discussions, CEQ is now seeking broad input on what should be done, how it should be done, and with what priority. Noting that the Report was to,

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Lessons Learned Quarterly Report; Fourth Quarter FY 2002; December 2, 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2002 December 2, 2002; Issue No. 33 LESSONS LEARNED LEARNED LESSONS CEQ Asks How to Improve NEPA Implementation; Responses Vary Widely continued on page 5 In response to questions from the Council on Environmental Quality's (CEQ's) NEPA Task Force, Federal, state, local, and tribal agencies, environmental and business groups, and individual citizens have weighed in during the past few months with opinions on how to improve NEPA implementation. CEQ also sought and received examples of best practices and case studies. Collectively, the comments cover nearly every aspect of NEPA implementation. They range from strong support for the value of the NEPA process to sharp criticism,

42

H-Area Acid/Caustic Basin Groundwater Monitoring Report. Fourth Quarter 1994 and 1994 summary  

SciTech Connect

During fourth quarter 1994, samples collected from the four HAC monitoring wells at the H-Area Acid/Caustic Basin were analyzed for selected heavy metals, herbicides/pesticides, indicator parameters, major ions, radionuclide indicators, and other constituents. Monitoring results that exceeded the final Primary Drinking Water Standards (PDWS) or the Savannah River Site (SRS) flagging criteria or turbidity standard during fourth quarter are the focus of this report.

Chase, J.A.

1995-03-01T23:59:59.000Z

43

Short-term energy outlook: Quarterly projections  

SciTech Connect

The Energy Information Administration (EIA) quarterly forecasts of short-term energy supply, demand, and prices are revised in January, April, July, and October for publication in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes previous forecast errors, compares recent projections by other forecasters, and discusses current topics of the short-term energy markets (see Short- Term Energy Outlook: Annual Supplement, DOE/EIA-0202). The principal users of the Outlook are managers and energy analysts in private industry and government. The projections in this volume extend through the fourth quarter of 1990. The forecasts are produced using the Short-term Integrated Forecasting System (STIFS). The STIFS model uses two principal driving variables: a macroeconomic forecast and world oil price assumptions. Macroeconomic forecasts produced by data Resources, Inc., (DRI), are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic forecast. EIA's Oil Market Simulation Model is used to project world oil prices. 20 refs., 17 figs., 16 tabs.

1989-07-01T23:59:59.000Z

44

RESULTS FOR THE FOURTH QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS  

Science Conference Proceedings (OSTI)

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

Bannochie, C.

2012-01-31T23:59:59.000Z

45

Oil Bypass Filter Technology Evaluation - Fourth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

ABSTRACT This fourth Oil Bypass Filter Technology Evaluation report details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and...

46

Natural gas imports and exports, fourth quarter report 1999  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-03-01T23:59:59.000Z

47

The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-12-31T23:59:59.000Z

48

H-Area Acid/Caustic Basin Groundwater Monitoring Report. Fourth quarter 1992 and 1992 summary  

Science Conference Proceedings (OSTI)

During fourth quarter 1992, samples from the four HAC monitoring wells at the H-Area Acid/Caustic Basin received comprehensive analyses. Monitoring results that exceeded the final Primary Drinking Water Standards (PDWS) or the Savannah River Site (SRS) flagging criteria or turbidity standard during the quarter are the focus of this report. Tritium exceeded the final PDWS in wells HAC 1, 2, 3, and 4 during fourth quarter 1992. Tritium activities in upgradient well HAC 4 were similar to tritium levels in wells HAC 1, 2, and 3. Iron was elevated in well HAC 1, 2, and 3. Specific conductance and manganese were elevated in one downgradient well each. No well samples exceeded the SRS turbidity standard. During 1992, tritium was the only constituent that exceeded the final PDWS. It did so consistently in all four wells during all four quarters, with little variability in activity.

Thompson, C.Y.

1993-03-01T23:59:59.000Z

49

F-Area Acid/Caustic Basin Groundwater Monitoring Report. Fourth Quarter 1994, Groundwater Monitoring Report  

Science Conference Proceedings (OSTI)

During fourth quarter 1994, samples from the FAC monitoring wells at the F-Area Acid/Caustic Basin were collected and analyzed for herbicides/pesticides, indicator parameters, metals, nitrate, radionuclide indicators, volatile organic compounds, and other constituents. Piezometer FAC 5P was dry and could not be sampled. New monitoring wells FAC 9C, 10C, 11C, and 12C were sampled for the first time during third quarter.

Chase, J.A.

1994-12-22T23:59:59.000Z

50

Short-term energy outlook, quarterly projections, first quarter 1998  

Science Conference Proceedings (OSTI)

The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

NONE

1998-01-01T23:59:59.000Z

51

Shale oil value enhancement research. Fourth quarterly report, 1996  

SciTech Connect

The main activities during this quarter were: (a) separation and characterization of kerogen oil non-polar fractions, (1) participating in the Dawnbreaker Commercial Assistance Program, (c) continuing the liaison with potential industrial partners, and (d) submitting a Phase II final report. In October, we submitted a draft of the final report for the base program and option Ia activities. In this final report, it was concluded that the industry is showing interest in the concept of producing pyridines from kerogen oil. Our economic analysis showed that with current technologies, pyridines can be effectively and economically manufactured from kerogen oil and is competitive with the synthesis manufacturers. It was also recommended that the Government elect to exercise its option to complete the originally proposed program. Performance of research under Option-I(b) will focus on the alternative scheme for refining the pyridine concentrates into pyridine and lower alkyl pyridines which are more valuable and easier to market to the current consumers. Performance of research under Option-II will focus on assuring the market acceptability of kerogen oil products. At the end of November, the U.S. Department of Energy exercised their option to require JWBA to complete the contract as originally awarded. The work on tasks contained in these options will be initiated in the following quarter.

Bunger, J.W.; Russell, C.P.; Tsai, J.C.H.; Cogswell, D.E.; Wright, A.D.

1997-09-01T23:59:59.000Z

52

Short-term energy outlook quarterly projections. First quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

Not Available

1994-02-07T23:59:59.000Z

53

Mixed Waste Management Facility (MWMF) groundwater monitoring report. Fourth quarter 1993 and 1993 summary  

Science Conference Proceedings (OSTI)

During fourth quarter 1993, 10 constituents exceeded final Primary Drinking Water Standards in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility, the Old Burial Ground, the E-Area Vaults, and the proposed Hazardous Waste/Mixed Waste Disposal Vaults. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. Carbon tetrachloride, chloroform, chloroethane (vinyl chloride), 1,1-dichloroethylene, dichloromethane (methylene chloride), lead, mercury, or tetrachloroethylene also exceeded standards in one or more wells. Elevated constituents were found in numerous Aquifer Zone 2B{sub 2} (Water Table) and Aquifer Zone 2B{sub 1}, (Barnwell/McBean) wells and in two Aquifer Unit 2A (Congaree) wells. The groundwater flow direction and rates in the three hydrostratigraphic units were similar to those of previous quarters.

Butler, C.T.

1994-03-01T23:59:59.000Z

54

Short-term energy outlook. Quarterly projections, 2nd quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

Not Available

1994-05-01T23:59:59.000Z

55

H-Area Acid/Caustic Basin Groundwater Monitoring Report. Fourth quarterly report and summary 1993  

SciTech Connect

The four monitoring wells at the H-Area Acid/Caustic Basin are sampled quarterly as part of the Savannah River Site (SRS) Groundwater Monitoring Program and to comply with a consent decree signed May 26, 1988, by the US District Court (District of South Carolina, Aiken Division). During fourth quarter 1993, samples from the monitoring wells received comprehensive analyses. Monitoring results that exceeded the final Primary Drinking Water Standards (PDWS), the SRS flagging criteria, or the SRS turbidity standard are the focus of this report. During fourth quarter 1993, tritium exceeded the final PDWS in all four HAC wells, with activities between 3.8E + 01 and 4.6E + 01 pCi/mL. Aluminum exceeded its Flag 2 criterion in wells HAC 2, 3, and 4. Iron exceeded its Flag 2 criterion in wells HAC 1, 2, and 3. Specific conductance was elevated in well HAC 2, total organic halogens exceeded its Flag 2 criterion in wells HAC 2 and 3, and manganese was elevated in wells HAC 3 and 4. No well samples exceeded the SRS turbidity standard.

Not Available

1994-03-01T23:59:59.000Z

56

Short-term energy outlook, quarterly projections, second quarter 1998  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

NONE

1998-04-01T23:59:59.000Z

57

F-Area Acid/Caustic Basin Groundwater Monitoring Report. Fourth quarterly report and summary 1993  

SciTech Connect

During fourth quarter 1993, samples from the six FAC monitoring wells at the F-Area Acid/Caustic Basin were collected and analyzed for indicator parameters, groundwater quality parameters, parameters indicating suitability as drinking water, and other constituents. One of the FAC piezometers was scheduled for these analyses but was dry. Analytical results that exceeded the final Primary Drinking Water Standards (PDWS) or the Savannah River Site (SRS) flagging criteria or turbidity standard during the quarter are the focus of this report. Gross alpha exceeded the final PDWS in two wells. Aluminum exceeded its Flag 2 criterion in five wells. Iron exceeded standards in four wells, manganese exceeded standards in two wells, and total organic halogens exceeded standards in one well. Turbidity exceeded the SRS standard in well FAC 3.

Not Available

1994-03-01T23:59:59.000Z

58

Sanitary landfill groundwater monitoring report. Fourth quarter 1994 and 1994 summary  

Science Conference Proceedings (OSTI)

Eighty-nine wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled quarterly to comply with the South Carolina Department of Health and Environmental Control Domestic Waste Permit DWP-087A and as part of the SRS Groundwater Monitoring Program. Dichloromethane, a common laboratory contaminant, and trichloroethylene were the most widespread constituents exceeding standards during 1994. Benzene, chloroethene (vinyl chloride), 1,2-dichloroethane, 1,1-dichloroethylene, 1,2-dichloropropane, gross alpha, mercury, nonvolatile beta, tetrachloroethylene, and tritium also exceeded standards in one or more wells. The groundwater flow direction in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 140 ft/year during first and fourth quarters 1994.

NONE

1995-02-01T23:59:59.000Z

59

Short-term energy outlook. Quarterly projections, Third quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

1994-08-02T23:59:59.000Z

60

PFBC HGCU Test facility. Technical progress report, Fourth quarter, CY 1994  

SciTech Connect

During this quarter, the Tidd Hot Gas Clean Up System completed a 691-hour test run which began during the third quarter. Table 1 summarizes all test runs since initial operation. Following this test run the system was shut down and the filter opened for inspection and recandling. The system remained out of service during the remainder of the quarter. In addition to monitoring and evaluating the performance of the HGCU system during testing, engineering effort was devoted to posttest inspection of the APF (Advanced Particle Filter) and evaluation of the effects of totally spoiling the primary cyclone. In addition, the authors worked with Westinghouse in the selection of replacement candles that were installed during the fourth quarter. During the unit outage this quarter, the primary cyclone upstream of the APF was modified to force all of the ash to pass through the cyclone and enter the APF without using spoiling air. Appendices to this report describe the dust shroud support strap design; an analysis of the effect of support-transferred vibrations on the failure of ceramic candle filters; the Tidd APF operation; the Tidd APF boroscope inspection; a general inspection of Tidd filter internals; tally of Tidd filters; ash formations in the W-APF-October 1994 post-test inspection; characterization of the as-manufactured and PFBC-exposed 3M CVI-SiC composite filter matrix; strength characterization of the first and second generation candle filters after 1,705 hours of PFBC operation at Tidd; and filters used in the December 1994 recandling effort at Tidd.

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Fourth Quarter 1983  

DOE Green Energy (OSTI)

At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small power production projects was 305, with a total estimated nominal capacity of 2,389 MW. Of these totals, 202 projects, capable of producing 566 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration, solid waste, or biomass projects had signed 101 contracts with a potential of 1,408 MW. In total, 106 contracts and letter agreements had been signed with projects capable of producing 1,479 MW. PG and E also had under active discussion 29 cogeneration projects that could generate a total of 402 MW to 444 MW, and 13 solid waste or biomass projects with a potential of 84 MW to 89 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 28, with a generating capability of 618 MW. Also, discussions were being conducted with 14 wind farm projects, totaling 365 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 8 other small wind projects under active discussion. There were 59 hydroelectric projects with signed contracts and a potential of 146 MW, as well as 72 projects under active discussion for 169 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E was planning to construct. Table B displays the above information. In tabular form, in Appendix A, are status reports of the projects as of December 31, 1983.

None

1983-01-01T23:59:59.000Z

62

F- and H-Area Sewage Sludge Application Sites groundwater monitoring report, fourth quarter 1991  

SciTech Connect

Eleven sewage sludge application sites at the Savannah River Site (SRS) were originally the subject of a research program, begun in 1980, using domestic sewage sludge to reclaim borrow pits and to enhance forest productivity at SRS. Currently, the F- and H-Area Sewage Sludge Application Sites are the only remaining active sludge application sites. During fourth quarter 1991, samples from the four monitoring wells at the F-Area site (FSS series) and three monitoring wells at the H-Area site (HSS series) were analyzed for specific conductance, pH, and certain pesticides, herbicides, toxic metals, water quality indicators, and radionuclides. This report describes monitoring results that exceeded the US Environmental Protection Agency primary drinking water standards (PDWS) and the SRS flagging criteria.

Thompson, C.Y.

1992-03-01T23:59:59.000Z

63

Hydrogen engine performance analysis project. Quarterly report  

DOE Green Energy (OSTI)

The objective of this project is to address the problems identified in order to obtain the data-base covering performance, operational characteristics and emissions essential for making a rational decision regarding the selection and design of prototype hydrogen-fueled, air-breathing engines capable of being manufactured for general automotive use. The project program plan calls for investigation of pre-intake valve closing fuel ingestion (Pre IVC) hydrogen-fueled engines during the first two of the three year project. With Pre IVC engines the fuel is introduced into the combustion chamber prior to closing of the intake valve. This is in contrast to Post IVC engines in which fuel is introduced in the cylinder after the intake valve closes. Post IVC engines are to be investigated during the third year according to the project program plan. This quarterly report is a summary of the work accomplished during the first three months of the project.

Adt, R.R. Jr.; Swain, M.R.

1977-03-01T23:59:59.000Z

64

F- and H-Area Sewage Sludge Application Sites groundwater monitoring report. Fourth quarter 1993 and 1993 summary  

SciTech Connect

Samples from the four wells at the F-Area Sewage Sludge Application Site (FSS wells) and the three wells at the H-Area Sewage Sludge Application Site (HSS wells) are analyzed quarterly for constituents as required by South Carolina Department of Health and Environmental Control Construction Permit 12,076 and, as requested, for other constituents as part of the Savannah River Site (SRS) Groundwater Monitoring Program. Annual analyses for other constituents, primarily metals, also are required by the permit. No constituent exceeded either the final Primary Drinking Water Standards or the SRS Flag 2 criteria during fourth quarter 1993. Iron, lead, and manganese were the only permit- required analytes that exceeded standards at the F- and H-Area Sewage Sludge Application Sites in 1993. Tritium, aluminum, and other constituents not included in the permit have exceeded standards at this site previously, but only sporadically. These constituents were not analyzed fourth quarter 1993.

1994-04-01T23:59:59.000Z

65

Short-term energy outlook. Quarterly projections  

SciTech Connect

Energy Information Administration (EIA) quarterly forecasts of short-term energy supply, demand, and prices are revised in February, May, August, and November for publication in the Short-Term Energy Outlook, quarterly projections. Methodology volumes, which are published with the May and November issues, contain descriptions of the forecasting system and detailed analyses of the current issues that affect EIA's short-term energy forecasts. The forecasts are produced using the Short-Term Integrated Forecasting System (STIFS). Two principal driving variables are used in the STIFS model: the macroeconomic forecast and the world oil price assumptions. The macroeconomic forecasts, which are produced by Data Resources, Inc., (DRI), are adjusted by EIA in cases where EIA projections of the world price of crude oil differ from DRI estimates. EIA's Oil Market Simulation Model is used to project the world oil prices. The three projections for petroleum supply and demand are based on low, medium, and high economic growth scenarios which incorporate high, medium, and low crude oil price trajectories. In general, the following discussion of the forecast refers to the medium, or base case, scenario. Total petroleum consumption sensitivities, using varying assumptions about the level of price, weather, and economic activity are tabulated.

1983-08-01T23:59:59.000Z

66

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011...

67

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

68

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY...

69

Automated Array Assembly, Phase 2. Quarterly technical progress report, fourth quarter 1977. Texas Instruments report No. 03-77-56  

DOE Green Energy (OSTI)

The Automated Array Assembly Task, Phase 2 of the Low Cost Silicon Solar Array (LSSA) Project, is a process development task. This contract includes solar cell module process development activities in the areas of Surface Preparation, Plasma Processing, Diffusion, Cell Processing and Module Fabrication. In addition, a High Efficiency Cell Development Activity is included. During this quarter, effort was concentrated on wafer etching for saw damage removal, establishing a standard phosphorous diffusion process and a baseline solar cell process as a test bed, designing a large area square cell including test sites, analyzing module layouts for optimum packing efficiency and fabricating the first Tandem Junction Cells (TJC) for this contract. A TJC with backside contacts gave 15.1% efficiency at AM1.

Carbajal, B.G.

1978-01-01T23:59:59.000Z

70

RESULTS FOR THE FOURTH QUARTER 2010 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS  

SciTech Connect

This report details the chemical and radionuclide contaminant results for the characterization of the 2010 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limits for {sup 94}Nb, {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 2. However, they are below the limits established in Reference 3. (3) There is an estimated concentration of trimethylbenzene (2.25 mg/L). This is not a WAC analyte, but it is the first time this organic compound has been detected in a quarterly WAC sample from Tank 50. (4) The reported detection limit for Norpar 13 is greater than the limit from Table 4 and Attachment 8.2 of the WAC. (5) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (6) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

Reigel, M.

2011-02-22T23:59:59.000Z

71

High efficiency shale oil recovery. Fourth quarterly report, October 1, 1992--December 31, 1992  

SciTech Connect

The overall project objective is to demonstrate the high efficiency of the Adams Counter-Current shale oil recovery process. The efficiency will first be demonstrated on a small scale, in the current phase, after which the demonstration will be extended to the operation of a small pilot plant. Thus the immediate project objective is to obtain data on oil shale retorting operations in a small batch rotary kiln that will be representative of operations in the proposed continuous process pilot plant. Although an oil shale batch sample is sealed in the batch kiln from the start until the end of the run, the process conditions for the batch are the same as the conditions that an element of oil shale would encounter in a continuous process kiln. Similar chemical and physical (heating, mixing) conditions exist in both systems. The two most important data objectives in this phase of the project are to demonstrate (1) that the heat recovery projected for this project is reasonable and (2) that an oil shale kiln will run well and not plug up due to sticking and agglomeration. The following was completed and is reported on this quarter: (1) A software routine was written to eliminate intermittently inaccurate temperature readings. (2) We completed the quartz sand calibration runs, resolving calibration questions from the 3rd quarter. (3) We also made low temperature retorting runs to identify the need for certain kiln modifications and kiln modifications were completed. (4) Heat Conductance data on two Pyrolysis runs were completed on two samples of Occidental oil shale.

Adams, D.C.

1992-12-31T23:59:59.000Z

72

Renewable Energy Finance Tracking Initiative (REFTI): Snapshot of Recent Geothermal Financing Terms, Fourth Quarter 2009 … Second Half 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

: : Snapshot of Recent Geothermal Financing Terms Fourth Quarter 2009 - Second Half 2011 Travis Lowder, Ryan Hubbell, Michael Mendelsohn, and Karlynn Cory Technical Report NREL/TP-6A20-54438 September 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Renewable Energy Finance Tracking Initiative (REFTI): Snapshot of Recent Geothermal Financing Terms Fourth Quarter 2009 - Second Half 2011 Travis Lowder, Ryan Hubbell, Michael Mendelsohn, and Karlynn Cory

73

Mixed Waste Management Facility (MWMF) Groundwater Monitoring Report: Fourth quarter 1991 and 1991 summary  

SciTech Connect

During fourth quarter 1991, tritium, trichloroethylene, tetrachloroethylene, chloroethene (vinyl chloride), total radium, mercury, and lead exceeded the US Environmental Protection Agency primary drinking water standards (PDWS) in groundwater samples from monitoring wells at the Mixed Waste Management Facility (MWMF) and adjacent facilities. Tritium and trichloroethylene were the most widespread contaminants; 55 (49%) wells exhibited elevated tritium activities, and 24 (21%) wells exhibited elevated trichloroethylene concentrations. Tritium and trichloroethylene levels exceeding the PDWS also occurred in several wells in Aquifer Unit IIA (Congaree). Levels of manganese, total organic halogens, nickel, iron, 1,1-dichloroethane, aluminum, nonvolatile beta, and trichlorofluoromethane that exceeded Flag 2 criteria were found in one or more wells beneath the MWMF. Downgradient wells in the three hydrostratigraphic units at the MWMF contained elevated levels of tritium, trichloroethylene, tetrachloroethylene, total radium, chloroethene (vinyl chloride), lead, mercury, manganese, total organic halogens, nickel, iron, 1,1-dichloroethane, aluminum, nonvolatile beta, or trichlorofluoromethane. Groundwater samples from 81 (72%) of the monitoring wells at the MWMF and adjacent facilities contained elevated levels of several contaminants.

Thompson, C.Y.

1992-03-01T23:59:59.000Z

74

Results For The Fourth Quarter 2012 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants  

SciTech Connect

This report details the chemical and radionuclide contaminant results for the characterization of the 2012 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC).Information from this characterization will be used by Waste Solidification Engineering (WSE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: The concentration of the reported chemical and radioactive contaminants were less than their respective WAC Limits and Targets, unless noted in this section; Norpar 13 and Isopar L have higher detection limits compared with the Saltstone WAC. The data provided in this report is based upon the concentrations in the sub-sample, and due to the limited solubility in aqueous solution, may not represent the concentrations of the analytes in Tank 50; Diisooctyl adipate (or diisooctyl hexanedioate) and 5-methyl-3-hexanol, plasticizers, were measured at 1.30E+00 mg/L and 3.00E+00 mg/L, respectively, in one of two replicate measurements conducted on an at-depth sample. The organic analysis of the at-depth sample was conducted at the request of SRR. These analytes were below the detection limits for the surface sample; and, The low insoluble solids content increases the measurement uncertainty for insoluble species.

Bannochie, C. J.

2013-02-05T23:59:59.000Z

75

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #20, July-September 2008  

SciTech Connect

July to September, 2008 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D. J.

2008-12-01T23:59:59.000Z

76

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #22, January - March 2009  

Science Conference Proceedings (OSTI)

January to March, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Not Available

2009-04-01T23:59:59.000Z

77

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #23, April-June 2009  

DOE Green Energy (OSTI)

April to June, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-08-01T23:59:59.000Z

78

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009  

DOE Green Energy (OSTI)

July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-10-01T23:59:59.000Z

79

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #25, October - December 2009  

DOE Green Energy (OSTI)

October to December, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2010-01-01T23:59:59.000Z

80

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #15, April - June 2007  

DOE Green Energy (OSTI)

July quarterly update for the National Bioenergy Center's Biochemical Processing Platform Integration Project.

Schell, D.

2007-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

F- and H-Area Sewage Sludge Application Sites groundwater monitoring report. Fourth quarter 1992 and 1992 summary  

SciTech Connect

Samples from the four wells at the F-Area Sewage Sludge Application Site (FSS wells) and the three wells at the H-Area Sewage Sludge Application Site (HSS wells) are analyzed quarterly for constituents as required by South Carolina Department of Health and Environmental Control Construction Permit 12,076 and, as requested, for other constituents as part of the Savannah River Site Groundwater Monitoring Program. Annual analyses for other constituents, primarily metals, also are required by the permit. During fourth quarter 1992, the FSS wells also were analyzed for a number of other constituents not required by the permit. Historically and currently, no permit-required analytes exceed standards at the F- and H-Area Sewage Sludge Application Sites except iron, lead, and manganese, which occur in elevated concentrations frequently in FSS wells. Lead concentrations exceeded the final Primary Drinking Water Standards during fourth quarter 1992, an event that is concurrent with a change in sampling procedures. Tritium is the primary nonpermit constituent that exceeds standards at the F-Area Sewage Sludge Application Site. Other constituents also exceed standards at this site but only sporadically.

1993-04-01T23:59:59.000Z

82

Atmospheric Properties from the 2006 Niamey Deployment and Climate Simulation with a Geodesic Grid Coupled Climate Model Fourth Quarter 2008  

SciTech Connect

In 2008, the Atmospheric Radiation Measurement (ARM) Program and the Climate Change Prediction Program (CCPP) have been asked to produce joint science metrics. For CCPP, the metrics will deal with a decade-long control simulation using geodesic grid-coupled climate model. For ARM, the metrics will deal with observations associated with the 2006 deployment of the ARM Mobile Facility (AMF) to Niamey, Niger. Specifically, ARM has been asked to deliver data products for Niamey that describe cloud, aerosol, and dust properties. The first quarter milestone was the initial formulation of the algorithm for retrieval of these properties. The second quarter milestone included the time series of ARM-retrieved cloud properties and a year-long CCPP control simulation. The third quarter milestone included the time series of ARM-retrieved aerosol optical depth and a three-year CCPP control simulation. This final fourth quarter milestone includes the time-series of aerosol and dust properties and a decade-long CCPP control simulation.

JH Mather; DA Randall; CJ Flynn

2008-09-30T23:59:59.000Z

83

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1995--September 1995  

DOE Green Energy (OSTI)

The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-95. It describes 80 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal energy cost evaluation and marketing strategy for geothermal district heating. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1995-12-01T23:59:59.000Z

84

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Fourth Quarterly Report  

SciTech Connect

This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNLs Legal Services were submitted to all the parties for signatures.

Nguyen, Ba Nghiep; Simmons, Kevin L.

2013-12-02T23:59:59.000Z

85

Environmental Compliance Performance Scorecard ¬タモ Fourth Quarter FY2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-SCORECARD-12-29-10.xlsx 0-SCORECARD-12-29-10.xlsx Page 1 of 73 EA & PEA MILESTONES MET DURING QUARTER (07/2010 - 09/2010) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (10/2010 - 09/2011) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) 1 previous Non-Impacting State NOV (with minor fine), & CBFO is still in negotiations with NMED on resolution of this one remaining NOV; 1 previous Non-Impacting State NOV (all corrective actions resolved in September 2010), & 1 previous ORPS Notification (resolved by NMED on 05/12/2010). N / A (0 / 0) N / A (0 / 0)

86

Environmental Compliance Performance Scorecard ¬タモ Fourth Quarter FY2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-SCORECARD-01-31-12.xlsx 1-SCORECARD-01-31-12.xlsx Page 1 of 88 EA & PEA MILESTONES MET DURING QUARTER (07/2011 - 09/2011) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (10/2011 - 09/2012) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN (CHANGED FROM YELLOW) --- 1 previous Non-Impacting State NOV (with minor fine), & NMED approved the work plan on August 5, 2011 and CBFO subsequently submitted a Class 2 Permit Modification to the HWFP addressing deficiencies in the program on September 29, 2011. Submittal of the PMR completed all actions necessary to resolve this NOV, and this matter can

87

PFBC HGCU Test Facility. Fourth quarterly technical progress report, [October--December 1993  

Science Conference Proceedings (OSTI)

The APF was shut down on September 23, 1993 and no operation was performed during this quarter. This report summarizes inspection, candle reinstallation, retrofit and accelerometer testing conducted during this three month outage.

Not Available

1994-01-01T23:59:59.000Z

88

K-Area and Par Pond Sewage Sludge Application Sites Groundwater Monitoring Report. Fourth quarter 1992 and 1992 summary  

Science Conference Proceedings (OSTI)

During fourth quarter 1992, samples from the three monitoring wells at the K-Area site (KSS series) and the three monitoring wells at the Par Pond site (PSS series) were analyzed for constituents required by South Carolina Department of Health and Environmental Control Construction Permit 13, 173 and for other constituents as part of the Savannah River Site (SRS) Groundwater Monitoring Program. This report describes monitoring results that exceeded the final Primary Drinking Water Standards (PDWS) or the SRS flagging criteria. During fourth quarter 1992, no constituents analyzed exceeded the PDWS or the SRS Flag 2 criteria at the K-Area and Par Pond Sewage Sludge Application Sites. In the KSS well series, the field measurement for alkalinity ranged as high as 26 mg/L in well KSS 1D. Alkalinity measurements were zero in the PSS wells. Historical and current water-level elevations at the K-Area and Par Pond Sewage Sludge Application Site indicate that the groundwater flow directions are south to southwest (SRS grid coordinates).

Thompson, C.Y.

1993-04-01T23:59:59.000Z

89

Environmental Compliance Performance Scorecard ¬タモ Fourth Quarter FY2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4TH-QUARTER-FY-2009-REGULATORY-COMPLIANCE-SCORECARD-02-19-10.xls 4TH-QUARTER-FY-2009-REGULATORY-COMPLIANCE-SCORECARD-02-19-10.xls Page 1 of 58 EA MILESTONES MISSED DURING QUARTER (07/2009 - 09/2009) / TOTAL QUARTER EA MILESTONES AT RISK EA MILESTONES NEXT FOUR QUARTERS (10/2009 - 09/2010) / TOTAL FOUR QUARTERS EA MILESTONES Argonne GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven GREEN GREEN (0 / 0) GREEN (0 / 1) N / A N / A N / A Carlsbad 1 previous Non-Impacting State NOV (with minor fine), 1 previous Non-Impacting State NOV, & 1 previous ORPS Notification (awaiting NMED formal response) GREEN (0 / 0) GREEN (0 / 0) N / A N / A SA Completed ETEC GREEN GREEN (0 / 0) GREEN (0 / 0) N / A N / A EIS Idaho GREEN GREEN (0 / 2) GREEN (0 / 3) N / A PA Revision ROD LANL 1 previous Impacting State Stipulated Penalty Demand Letter, for a

90

Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1997-10-01T23:59:59.000Z

91

Minnesota Agripower Project. Quarterly report, July 1996--September 1996  

DOE Green Energy (OSTI)

Program status and accomplishments for the quarter are summarized in this report. The Agri-Power project is aimed at the development of alfalfa as a biomass fuel for power generation. Components of the project include varietal evaluation and selection; development of harvest, storage, and transportation systems; pellet production; and assessment of gasification and other combustion systems. Major items reported for the quarter include: (1) Design Package - economic analysis, (2) Review and Confirmation of the Alfalfa Feedwater Supply - sampling studies and resistance studies of varietals, and (3) Project Management, Engineering, and Administration - evaluation of gasification and power generating cycles.

Hanson, C.

1997-01-01T23:59:59.000Z

92

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report for July through September 1994 (Fourth quarter of fiscal year 1994)  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the US. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: advancement of electric vehicle technologies; development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. The ultimate thrust of program activities varies among sites, reflecting not only the Operator`s business interests but also geographic and climate-related operating conditions. This fourth quarter report (FY-94) includes a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now found in Appendix A.

Kiser, D.M.; Brown, H.L.

1995-03-01T23:59:59.000Z

93

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update No.5, October-December 2004  

DOE Green Energy (OSTI)

Fifth issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2005-02-01T23:59:59.000Z

94

National Bioenergy Center Sugar Platform Integration Project Quarterly Update: April/June 2004, No.3  

DOE Green Energy (OSTI)

Third issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2004-07-01T23:59:59.000Z

95

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update No.6, January-March 2005  

DOE Green Energy (OSTI)

Sixth issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project

Not Available

2005-04-01T23:59:59.000Z

96

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update, January/March 2004, No.2  

DOE Green Energy (OSTI)

Second issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2004-05-01T23:59:59.000Z

97

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #7, April-June 2005  

DOE Green Energy (OSTI)

Volume 7 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Not Available

2005-07-01T23:59:59.000Z

98

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update, Issue No.1, October-December 2003  

DOE Green Energy (OSTI)

First issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2004-03-01T23:59:59.000Z

99

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #11, April-June 2006  

DOE Green Energy (OSTI)

Volume 11 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2006-07-01T23:59:59.000Z

100

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #8, July-September 2005  

Science Conference Proceedings (OSTI)

Volume 8 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2005-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #21, October - December 2008  

SciTech Connect

October to December, 2008 edition of the National Bioenergy Center?s Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-01-01T23:59:59.000Z

102

National Bioenergy Center Biochemical Platform Process Integration Project: Quarterly Update #18, January-March 2008  

DOE Green Energy (OSTI)

January-March, 2008 edition of the quarterly update for the National Bioenergy Center's Biochemical Platform Integration Project.

Schell, D.

2008-04-01T23:59:59.000Z

103

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #9, October-December 2005  

DOE Green Energy (OSTI)

Volume 9 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D. J.

2006-01-01T23:59:59.000Z

104

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #10, January-March 2006  

DOE Green Energy (OSTI)

Volume 10 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Not Available

2006-04-01T23:59:59.000Z

105

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #12, July-September 2006  

DOE Green Energy (OSTI)

Volume 12 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2006-10-01T23:59:59.000Z

106

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009  

SciTech Connect

July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-10-01T23:59:59.000Z

107

DOE KSU EV Site Operator Program. Year 1, fourth quarter report, April 1--June 30, 1992  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter`s report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-08-01T23:59:59.000Z

108

Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement  

Science Conference Proceedings (OSTI)

The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

NONE

1994-03-31T23:59:59.000Z

109

Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement  

SciTech Connect

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1994-12-31T23:59:59.000Z

110

Study on reduction of accessory horsepower requirements. Fourth quarterly progress report  

DOE Green Energy (OSTI)

The program objective is to evolve and define an accessory drive system that will minimize system power consumption of driven accessories on an internal combustion engine in a passenger automobile. The initial three program phases established concept feasibility, determined potential fuel savings, and selected a drive system design for concept mechanization. During this quarter the major program accomplishments were: selection of candidate belt-drive concepts; completion of Phase III baseline vehicle drive systems physical and operational envelopes; completion of analysis for a mechanically controlled direct-operated belt drive with input programming; and completion of design layout and analysis for a hydromechanically controlled, servo-operated belt drive with output-speed sensing. (LLL)

Not Available

1975-07-30T23:59:59.000Z

111

Orcas Power and Light Company [fourth quarterly] technical progress report, July--September 1992  

DOE Green Energy (OSTI)

After a year of operating the G-Van, OPALCO concluded that the company transportation needs were not being met by the G-Van. The previous quarterly report mentioned battery problems with the Solectria (No. 51). This problem is one of reduced range and power and has been determined to be caused by one or more individual monoblock failures. The local Solectria representative and Solectria headquarters personnel have been aware of this unsatisfactory condition and are continuing their attempt to solve it. The Solectria and G-Van continue to be used intermittently by company personnel for errands and engineering trips. Generally, the smaller, compact size of the Solectria make it the most preferred by company drivers. Clearly the G-Van is not selected for use because of its size and weight. It is important to note that the driver dissatisfaction is not related to the fact that it is an electric van, but more its lack of maneuverability.

Not Available

1992-12-31T23:59:59.000Z

112

Orcas Power and Light Company [fourth quarterly] technical progress report, July--September 1992  

DOE Green Energy (OSTI)

After a year of operating the G-Van, OPALCO concluded that the company transportation needs were not being met by the G-Van. The previous quarterly report mentioned battery problems with the Solectria (No. 51). This problem is one of reduced range and power and has been determined to be caused by one or more individual monoblock failures. The local Solectria representative and Solectria headquarters personnel have been aware of this unsatisfactory condition and are continuing their attempt to solve it. The Solectria and G-Van continue to be used intermittently by company personnel for errands and engineering trips. Generally, the smaller, compact size of the Solectria make it the most preferred by company drivers. Clearly the G-Van is not selected for use because of its size and weight. It is important to note that the driver dissatisfaction is not related to the fact that it is an electric van, but more its lack of maneuverability.

Not Available

1992-01-01T23:59:59.000Z

113

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

Science Conference Proceedings (OSTI)

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

114

Hydrogen engine performance analysis project. Quarterly report  

DOE Green Energy (OSTI)

The objective of this project is to address the problems identified in the literature and in the project proposal in order to obtain the data-base covering performance, operational characteristics and emissions essential for making a rational decision regarding the selection and design of prototype hydrogen-fueled, air-breathing engines capable of being manufactured for general automotive use. The project program plan calls for investigation of pre-intake valve closing fuel ingestion (Pre IVC) hydrogen-fueled engines during the first two of the three year project. With Pre IVC engines the fuel is introduced into the combustion chamber prior to closing of the intake valve. This is in contrast to Post IVC engines in which fuel is introduced in the cylinder after the intake valve closes. Post IVC engines are to be investigated during the third year according to the project program plan. This quartery report is a summary of the work accomplished during the first three months of the project. For completeness it contains information presented in the first two monthly reports.

Adt, R.R. Jr.; Swain, M.R.; Pappas, J.M.

1977-03-01T23:59:59.000Z

115

Commercialization of atom interferometers for borehole gravity gradiometry. Fourth quarterly report, July--September 1993  

DOE Green Energy (OSTI)

The present status of tasks is: Task 1- Solution of tomography problem (completed qtrs. 1 and 2), Task 2- Study influence of vibrations (completed qtr. 3), Task 3- List of borehole imposed constraints (completed qtr.3 with update this qtr.), Task 4- Evaluate merits of various cooling schemes (completed this qtr.), Task 5- Specify magnet system requirements (completed qtr. 3), Task 6-Specify laser system (in progress), and Task 7- a. specify detector, b. specify gratings and layout, c. specify gratings and magnet spacers, d. specify vacuum system (all in progress). During this quarter, we report an update to Task 3, as well as the completion of Task 4. Work on Tasks 6 and 7 is in progress. The use of a magneto-optic trap (MOT), the choice of atomic species, state of the art for lithium MOT`s, use of lenses to increase the intensity, computerized simulation of system throughtput, and magnetic lens design are the topics addressed concerning Task 4.

Clauser, J.F.

1993-11-01T23:59:59.000Z

116

QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) 1991 1 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION February 1991 This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunications Device for the

117

QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) 1991 3 QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION August 1991 This publication may be purchased from the Superintenden t of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunica tions device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunic ations Device for the

118

Oil Bypass Filter Technology Evaluation, Fourth Quarterly Report, July--September 2003  

Science Conference Proceedings (OSTI)

This fourth Oil Bypass Filter Technology Evaluation report details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and Environmental Laboratory (INEEL) for the U.S. Department of Energys FreedomCAR & Vehicle Technologies Program. Eight four-cycle diesel-engine buses used to transport INEEL employees on various routes have been equipped with oil bypass filter systems from the puraDYN Corporation. The bypass filters are reported to have engine oil filtering capability of miles. This represents an avoidance of 21 oil changes, which equates to 740 quarts (185 gallons) of oil not used or disposed of. To validate the extended oil-drain intervals, an oil-analysis regime evaluates the fitness of the oil for continued service by monitoring the presence of necessary additives, undesirable contaminants, and engine-wear metals. For bus 73450, higher values of iron have been reported, but the wear rate ratio (parts per million of iron per thousand miles driven) has remained consistent. In anticipation of also evaluating oil bypass systems on six Chevrolet Tahoe sport utility vehicles, the oil is being sampled on each of the Tahoes to develop a characterization history or baseline for each engine.

James E. Francfort; Larry Zirker

2003-11-01T23:59:59.000Z

119

F-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1  

Science Conference Proceedings (OSTI)

During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the second half of 1993, notably aluminum, iodine-129, and zinc. The elevated constituents are found primarily in Aquifer Zone 2B{sub 2} and Aquifer Zone 2B{sub 1} wells. However, several Aquifer Unit 2A wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Water-level maps indicate that the groundwater flow rates and directions at the FASB have remained relatively constant since the basins ceased to be active in 1988.

Butler, C.T.

1994-03-01T23:59:59.000Z

120

NEPA Project quarterly progress report, April 1--June 30, 1950  

DOE Green Energy (OSTI)

Exploration of various types of power plant cycles for nuclear propelled aircraft has been continued during this quarter. The principal current objective of the project is the development of information which will make an intelligent choice of the basic power plant cycle possible. It is still hoped that this choice can be made late in 1950. The survey studies which have been under way for several months continued during the quarter. These consist of analyses and rough preliminary layouts for various types of aircraft, using each of the several basic cycles which have been seriously considered for each of the three phases of development. Although it is still extremely premature to discuss the relative merits of the various cycles, the information so for developed discloses some cycle differences which may, if confirmed by additional work, be significant. In this respect, there have been no recent major changes in the comparative standings of the cycles.

NONE

1950-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE Safety Metrics Indicator Program (SMIP) Fiscal Year 2001 Fourth Quarter Report of Packaging- and Transportation-related Occurrences  

Science Conference Proceedings (OSTI)

The Safety Metrics Indicator Program (SMIP) retrieved 44 packaging- or transportation-related occurrences from the Occurrence Reporting and Processing System (ORPS) during the period from July 1 through September 30, 2001. Only those incidents that occur in preparation for transport, during transport, and during unloading of hazardous material are considered as packaging- or transportation-related occurrences. Other incidents with packaging and transportation (P and T) significance but not involving hazardous material (such as vehicle accidents or empty packagings) are not rated to the SMIP criteria, but are archived in the SMIP Subsidiary Database of occurrences, a sub-database of the main SMIP P and T Occurrence Database. Thirty-two of the originally-selected 44 occurrences were appropriate for classification to the SMIP criteria, only 7 of which have offsite applicability. Eight of the original 44 reports are archived in a subsidiary database because they either do not involve the transport of hazardous material or do not involve transport by vehicle, plane, boat, or rail. The others either were deleted because more thorough review revealed that they were not strictly related to P and T or were canceled by the reporting site and removed from the ORPS. These occurrences have not been normalized as in the Annual Report of Occurrences because the necessary information is not yet available. The number and severity of the selected occurrence reports (ORs) are consistent with historical reporting. Contamination events continue to be among the most common type of occurrences; however, ''Shipping Preparation'' events decreased this quarter to only 4 events from the 21 reported last quarter. None of the 32 ORs that were rated had event consequence measures (W{sub EC}) greater than 2; 14 of them were categorized as having a W{sub EC} of 1. This means that all of the fourth-quarter FY 2001 ORs had only slight consequences at worst (i.e., resulting in minimal safety consequences with little potential for ultimately leading to suspected endangerment of people or environmental contamination). Because the event consequence measure is low, the overall hazard significance ratings (HSRs) are relatively low, indicating that the actual risks posed by the occurrences are not highly threatening. In fact, even the one reported emergency OR and the two unusual ORs had HSRs of 24 or less. The ORs are summarized in the appendix and listed along with their HSRs and stakeholder interest [currently termed the stakeholder and publicity rating (SPR)]. This enables one to get a feel for how the nature of an occurrence and its P and T significance translate into a severity rating. During the quarter, it was noticed that the number of events pertaining to either dropping packages or damaging packages while moving material by forklift had increased from previous years. Only four such events were reported in FY 1999 and seven events reported during FY 2000. However, 13 events have been reported during this fiscal year. Therefore a lessons learned (LL) pertaining to minimizing accidents while moving material by forklift was developed and posted to the U.S. Department of Energy LL list server to mitigate this trend.

Dickerson, L.S.

2001-11-30T23:59:59.000Z

122

Detection Technologies, Arms control and nonproliferation technologies. Third/fourth quarters 1993  

SciTech Connect

This issue of Arms Control and Nonproliferation Technologies is another in a series of issues about specific means for detecting and identifying proliferation and other suspect activities outside the realm of arms control treaties. All the projects discussed are funded by the Office of Research and Development of the Department of Energy`s Office of Nonproliferation and National Security.

Staehle, G; Stull, S; Talaber, C; Moulthrop, P [eds.

1993-12-31T23:59:59.000Z

123

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1996-11-01T23:59:59.000Z

124

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #16, July-September 2007  

DOE Green Energy (OSTI)

This quarterly update contains information on the National Bioenergy Center Biochemical Platform Integration Project, R&D progress and related activities.

Schell, D.

2007-10-01T23:59:59.000Z

125

National Bioenergy Center Biochemical Platform Process Integration Project: Quarterly Update #18, January-March 2008  

SciTech Connect

January-March, 2008 edition of the quarterly update for the National Bioenergy Center's Biochemical Platform Integration Project.

Schell, D.

2008-04-01T23:59:59.000Z

126

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #12, July-September 2006  

SciTech Connect

Volume 12 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2006-10-01T23:59:59.000Z

127

AFBC co-firing of coal and hospital waste. Fourth quarterly report, 1997  

DOE Green Energy (OSTI)

The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated is as follows: Steam =20,000 lb/hr; Temperature = 353 F (saturated); Pressure= 125 psig; Steam quality = 98.5%

NONE

1997-07-01T23:59:59.000Z

128

Westinghouse Hanford Company health and safety performance report. Fourth quarter calendar year 1994  

Science Conference Proceedings (OSTI)

Detailed information pertaining to As Low As Reasonably Achievable/Contamination Control Improvement Project (ALARA/CCIP) activities are outlined. Improved commitment to the WHC ALARA/CCIP Program was experienced throughout FY 1994. During CY 1994, 17 of 19 sitewide ALARA performance goals were completed on or ahead of schedule. Estimated total exposure by facility for CY 1994 is listed in tables by organization code for each dosimeter frequency. Facilities/areas continue to utilize the capabilities of the RPR tracking system in conjunction with the present site management action-tracking system to manage deficiencies, trend performance, and develop improved preventive efforts. Detailed information pertaining to occupational injuries/illnesses are provided. The Industrial Safety and Hygiene programs are described which have generated several key initiatives that are believed responsible for improved safety performance. A breakdown of CY 1994 occupational injuries/illnesses by type, affected body group, cause, job type, age/gender, and facility is provided. The contributing experience of each WHC division/department in attaining this significant improvement is described along with tables charting specific trends. The Radiological Control Program is on schedule to meet all RL Site Management System milestones and program commitments.

Lansing, K.A.

1995-03-01T23:59:59.000Z

129

Quarterly oil report: Third quarter, 1987. [CA  

Science Conference Proceedings (OSTI)

The volumes of petroleum fuels supplied to California in the fourth quarter of 1987 increased 1.6 percent from year ago levels. The increase is the result of increased unleaded gasoline and residual fuel oil use. Other fourth quarter results show that all product imports remained higher than year ago levels, but most were below the previous quarter except unleaded gasoline. Unleaded gasoline imports were higher, exports were reduced and stocks drawn down in the fourth quarter compared to the previous quarter to meet increased demand for unleaded fuel. Demand for low sulfur fuel oil increased toward the end of the quarter because natural gas sales to electric utilities were curtailed.

Not Available

1988-01-01T23:59:59.000Z

130

Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996  

SciTech Connect

This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

1998-02-01T23:59:59.000Z

131

National Bioenergy Center--Biochemical Platform Integration Project: Quarterly Update, Fall 2010  

DOE Green Energy (OSTI)

Fall 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: rapid analysis models for compositional analysis of intermediate process streams; engineered arabinose-fermenting Zymomonas mobilis strain.

Schell, D.

2010-12-01T23:59:59.000Z

132

Western Gas Sands Project Quarterly Basin Activities Report  

SciTech Connect

This quarterly basin activities report is a summation of three months drilling and testing activities in the Greater Green River Basin, Northern Great Plains Province, Piceance Basin, and Uinta Basin. Detailed information is given for each study area for the first quarter of 1979.

Atkinson, C H

1979-04-30T23:59:59.000Z

133

Great Plains Coal Gasification Project. Technical quarterly report, 1st quarter, 1984. [Great Plains, Mercer County, North Dakota  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet the Great Plains Coal Gasification project's full gas production date. Detailed engineering is complete for the gasification plant. The remaining engineering tasks, which include field support activities and special projects, will be performed by the Contractors' Field Engineering Group. A substantial amount of construction progress was achieved during the first quarter. It is currently projected that construction will be complete at the end of September, 1984. Start-Up operations are continuing at a rapid pace. Commissioning activities are proceeding very well. The only remaining plant permit is the Permit to Operate, which will be issued in late 1985. Quality Assurance/Quality Control activities included the development of welding procedures for Operations personnel, safety relief valve testing, and equipment turnover inspections. Mine development activities remain on schedule. Initial coal deliveries to GPGA commenced this quarter.

Not Available

1984-05-01T23:59:59.000Z

134

Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

Not Available

1993-12-31T23:59:59.000Z

135

Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

Not Available

1992-12-31T23:59:59.000Z

136

Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

Not Available

1993-12-01T23:59:59.000Z

137

Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994  

Science Conference Proceedings (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

Not Available

1994-08-01T23:59:59.000Z

138

EMSL Quarterly Highlights Report: FY09, 4th Quarter  

Science Conference Proceedings (OSTI)

This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

2009-10-21T23:59:59.000Z

139

Electric and hybrid vehicle project. Quarterly report of private-sector operations, first quarter 1982  

DOE Green Energy (OSTI)

As of January 1, 1982 sixteen private-sector site operators at 30 sites in the US were involved in electric and hybrid electric-powered vehicle demonstration programs. Data for 1981 and the first quarter of 1982 are presented on vehicle selection, miles accumulated, energy usage, maintenance requirements, reliability and operating performance for demonstration vehicles at each site. (LCL)

None

1982-06-01T23:59:59.000Z

140

Great Plains Coal Gasification Project: Quarterly technical progress report, April-June 1988 (Fourth fiscal quarter, 1987-1988)  

Science Conference Proceedings (OSTI)

This progress report describes the operation of the Great Plains Gasification Plant, including lignite coal production, SNG production, gas quality, by-products, and certain problems encountered. (LTN)

Not Available

1988-07-29T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

ORNL Projects for the NRC Office of Nuclear Regulatory Research. Quarterly management report for Fourth Quarter, FY 1983  

SciTech Connect

Cost and budget data are presented for the Division of Engineering Technology; Division of Accident Evaluation; Divison of Risk Analysis; Division of Facility Operations; and Division of Health, Siting and Waste Management.

Malinauskas, A.P.

1983-12-01T23:59:59.000Z

142

Baca geothermal demonstration project. Quarterly technical progress report, October 1-December 31, 1980  

SciTech Connect

Work completed on the Baca 50 Megawatt (MWe) Geothermal Demonstration Power Plant Project, Baca Location No. 1, New Mexico is reported. Topics covered in this quarterly report include progress made in the well and steam production systems, the power plant and transmission systems, and in the project data management program.

1981-03-01T23:59:59.000Z

143

Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Fourth quarterly technical progress report, Second quarter, 1993  

SciTech Connect

The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. The major activity during the second quarter of 1993 was focussed on completion of Task 4, Preliminary Design. The selected design has been designated H.1 Cyclocraft by MRC. Also during the report period, Task 6, Ground Support, was completed and a report containing the results was submitted to DOE. This task addressed the complete H.1 Cyclocraft system, i.e. it included the need personnel, facilities and equipment to support cyclocraft operations in wetland areas.

Eggington, W.J.

1993-09-01T23:59:59.000Z

144

Great Plains Coal Gasification project. Quarterly technical progress report, third quarter 1985  

Science Conference Proceedings (OSTI)

The operations of the Great Plains Gasification Plant are reported for the third quarter of 1985. Contents include the following: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications-1985; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical services; (12) environmental; and (13) quality assurance/quality control activities.

Not Available

1985-10-31T23:59:59.000Z

145

Great Plains Coal Gasification Project. Quarterly environmental report, second quarter, 1986  

Science Conference Proceedings (OSTI)

Following the executive summary, this quarterly report includes environmental monitoring program, supplemental environmental program, and quality assurance/quality control activities. Under the environmental monitoring program, the following topics are covered: permiting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. The supplemental environmental program includes: performance survey; toxicity screening study; data base management system; epidemiology; and contingency program. (AT)

Not Available

1986-07-01T23:59:59.000Z

146

(Great Plains coal gasification project): Quarterly environmental report, Third quarter 1986  

Science Conference Proceedings (OSTI)

Environmental monitoring, supplemental environmental programs and quality assurance/quality control activities are presented in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. The supplemental environmental program covers: performance survey; toxicity screening study; data base management system; epidemiology; and contingency program. 16 figs., 53 tabs. (AT)

Not Available

1986-10-01T23:59:59.000Z

147

Nucla circulating atmospheric fluidized bed demonstration project. Quarterly technical progress report, October--December 1990  

Science Conference Proceedings (OSTI)

During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

Not Available

1991-01-31T23:59:59.000Z

148

Great Plains Coal Gasification project. Quarterly environmental report, third quarter, 1985  

Science Conference Proceedings (OSTI)

Environmental monitoring, supplemental environmental programs and quality assurance/quality control activities are covered in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; and environmental incident summary. The supplemental environmental program covers: performance survey; wastewater control and steam generation system; sulfur control; tar reinjection outage; gasifier effluent control systems; toxicity screening study; toxicant characterization; data base management system; workplace characterization; fugitive emissions; epidemiology; atmospheric program; effects of cooling tower effluents on terrestial ecosystems; and contingency program. 15 figs., 56 tabs.

Not Available

1985-10-01T23:59:59.000Z

149

Great Plains coal gasification project. Quarterly technical progress report, first quarter 1986. [Lurgi Process  

SciTech Connect

Environmental monitoring, supplemental enviornmental programs, and quality assurance/quality control activities are covered in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. The supplemental environmental program covers: performance survey; wastewater control and steam generation system; sulfur control; tar reinjection outage; gasifier effluent control system; toxicity screening study; toxicant characterization; data base management system; workplace characterization; fugitive emissions; epidemiology; atmospheric program; effects of cooling tower effluents on terrestrial ecosystems; and contingency program.

Not Available

1986-04-01T23:59:59.000Z

150

Great Plains Coal Gasification Project. Quarterly technical progress report, second quarter 1986. [Lurgi process  

SciTech Connect

The operations of the Great Plains coal gasification plant are reported for the second quarter of 1986. The following areas are covered: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications - 1986 budget; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical services; (12) environmental executive summary; and (13) quality assurance/quality control activities. (AT)

Not Available

1986-07-31T23:59:59.000Z

151

Great Plains coal gasification project: Quarterly technical progress report, Third quarter 1986. [Lurgi process  

Science Conference Proceedings (OSTI)

Accomplishments for the third quarter of 1986 are presented for the Great Plains coal gasification plant. The following areas are discussed: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) onstream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications - 1986 budget; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical services; (12) environmental executive summary; and (13) quality assurance/quality control activities.

Not Available

1986-10-31T23:59:59.000Z

152

(Great Plains Coal Gasification Project): Quarterly environmental, safety, and medical report, first quarter 1988  

Science Conference Proceedings (OSTI)

The following brief synopsis is provided of the status of Environmental, Safety and Medical Programs described in the First Quarter 1988 Report. Tabular summaries of environmental QA/QC results and planned next quarter activities are presented in Sections 2.0 and 3.0, respectively. ANG continued permitting activity during the reporting period. These activities include reviewing the revised RCRA Part B application; receiving approval to discharge high temperature, low pressure steam condensate to the stormwater system; receiving approval to expand the current gasifier ash pit; submitting the results of the EPA laboratory audit samples; finalizing the contract for the Deepwell No. 1 and No. 2 work to comply with UIC-101; monitoring the progress of the cooling tower surge pond B liner leaks; receiving approval to delete several parameters in the Interim Groundwater Monitoring Plan; responding to an EPA Hazardous Waste Questionnaire and a CERCLA site assessment for DOE; submitting the DOE-assigned section for the Modified Permit Application; and submitting the first annual chemical inventory report to comply with Section 312 of SARA. ANG conducted eight monitoring programs in the vicinity of the Great Plains facility. The RAMP network consists of five monitoring sites, and it is designed to monitor meteorology and air quality in the vicinity of the Great Plains facility and the Antelope Valley and Coyote electric generating stations. ANG conducts ambient monitoring for H/sub 2/S at one site in the vicinity of the Great Plains facility. 15 figs., 49 tabs.

Not Available

1988-05-01T23:59:59.000Z

153

CO{sub 2} Huff-n-Puff process in a light oil shallow shelf carbonate reservoir. Quarterly technical progress report, Fourth quarter 1995  

Science Conference Proceedings (OSTI)

The principle objective of the Central Vacuum Unit (CVU) CO{sub 2} Huff-n-Puff (H-n-P) project is to determine the feasibility and practicality of the technology in a waterflooded shallow shelf carbonate environment. The results of parametric simulation of the CO{sub 2} H-n-P process, coupled with the CVU reservoir characterization components will determine if this process is technically and economically feasible for field implementation. The technology transfer objective of the project is to disseminate the knowledge gained through an innovative plan in support of the Department of Energy`s objective of increasing domestic oil production and deferring the abandonment of shallow shelf carbonate (SSC) reservoirs. Texaco Exploration and Production Inc`s. (TEPI) mid-term plans are to implement a full-scale miscible CO{sub 2} project in the CVU. TEPI has concluded all of the Tasks associated with the First Budget Period. The DOE approved the TEPI continuation application. Budget Period No. 2 is now in progress. Initial injection of CO{sub 2} began in November, and after a short shut-in period for the soak, the well was returned to production in late December, 1995.

Wehner, S.; Prieditis, J.

1996-02-05T23:59:59.000Z

154

Geothermal policy project. Quarterly report, August 1-October 31, 1979  

DOE Green Energy (OSTI)

The NCSL geothermal policy project continued with initiating geothermal studies in new project states and furthering policy development in existing states. Activities of the project staff are reviewed. (MHR)

Sacarto, D.M.

1979-11-01T23:59:59.000Z

155

Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981  

DOE Green Energy (OSTI)

Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Hanenburg, W.H.; Lacy, R.G.; Van De Mark, G.D.

1981-06-01T23:59:59.000Z

156

National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Summer 2011 (Newsletter)  

Science Conference Proceedings (OSTI)

Summer 2011 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: evaluating new analytical techniques for measuring soluble sugars in the liquid portion of biomass hydrolysates, and measurement of the fraction of insoluble solids in biomass slurries.

Not Available

2011-09-01T23:59:59.000Z

157

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #28, Spring 2011  

DOE Green Energy (OSTI)

Spring 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program sessions and special topic sessions; assessment of waste water treatment needs; and an update on new arabinose-to-ethanol fermenting Zymomonas mobilis strains.

Schell, D. J.

2011-04-01T23:59:59.000Z

158

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #27, April - June 2010  

Science Conference Proceedings (OSTI)

April-June, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding performance of alternative process configurations for producing ethanol from biomass; investigating Karl Fischer Titration for measuring water content of pretreated biomass slurries.

Schell, D.

2010-07-01T23:59:59.000Z

159

National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010  

DOE Green Energy (OSTI)

Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

Schell, D.

2011-02-01T23:59:59.000Z

160

Geothermal policy project. Quarterly report, June 1-August 31, 1980  

DOE Green Energy (OSTI)

Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

Connor, T.D.

1980-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Tidd PFBC demonstration project. Quarterly report, October--December 1993  

SciTech Connect

This is the 27th Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from October 1, 1993 to December 31, 1993. Major activities during this period involve: (1) The unit operated for 720 hours on coal. (2) There were five gas turbine starts, five bed preheater starts, and three operating periods on coal fire. (3) During the quarter, total gross generation was 36,672 MWH, the peak unit output for one hour was 64 MWH, and the coal consumption was 17,251 tons. (4) Six performance tests were run during this quarter. (5) The unit was tested with four sorbent feed points. (6) The gas turbine low pressure compressor was disassembled to repair cracks in the stationary guide vanes; and (7) a request was sent to the DOE requesting funding for an additional year of operation. Major items planned for the next period include: (a) Continuation of sorbent utilization tests at various bed levels and sulfur retention values and with different coals and adsorbents; and (b) operation at full load.

Not Available

1994-01-01T23:59:59.000Z

162

Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1--March 31, 1993  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on several different projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Pilot Program; Plasma Furnace Projects for waste destruction; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project for removal of radioactive materials; and Spray Casting Project.

Not Available

1993-09-01T23:59:59.000Z

163

Coal plasticity at high heating rates and temperatures. First technical progress report for the fourth quarter 1989  

SciTech Connect

The broad objective of this project is to obtain improved, quantitative understanding of the transient plasticity of bituminous coals under high heating rates and other reaction and pretreatment conditions of scientific and practical interest. To these ends the research plan is to measure the softening and resolidification behavior of two US bituminous coals with a rapid-heating, fast response, high-temperature coal plastometer, previously developed in this laboratory. Specific measurements planned for the project include determinations of apparent viscosity, softening temperature, plastic period, and resolidificationtime for molten coal: (1) as a function of independent variations in coal type, heating rate, final temperature, gaseous atmosphere (inert, 0{sub 2} or H{sub 2}), and shear rate; and (2) in exploratory runs where coal is pretreated (preoxidation, pyridine extraction, metaplast cracking agents), before heating. The intra-coal inventory and molecular weight distribution of pyridine extractables will also be measured using a rapid quenching, electrical screen heater coal pyrolysis reactor. The yield of extractables is representative of the intra-coal inventory of plasticing agent (metaplast) remaining after quenching. Coal plasticity kinetics will then be mathematically modeled from metaplast generation and depletion rates, via a correlation between the viscosity of a suspension and the concentration of deformable medium (here metaplast) in that suspension. Work during this reporting period has been concerned with re-commissioning the rapid heating rate plastometer apparatus.

Darivakis, G.S.; Peters, W.A.; Howard, J.B.

1990-01-01T23:59:59.000Z

164

Superacid catalysis of light hydrocarbon conversion. DOE PETC fourth quarterly report, May 25, 1994--August 24, 1994  

SciTech Connect

The primary goal of this project is to evaluate the potential value of solid superacid catalysts of the sulfated zirconia type for light hydrocarbon conversion. The key experiments include testing of the performance of such catalysts in a flow reactor fed with streams containing, for example, n-butane or propane. A solid superacid catalyst was prepared by addition of iron and manganese to sulfated zirconium hydroxide followed by calcination. The catalyst was tested for n-butane conversion in a packed-bed flow reactor at temperatures of 40 to 225{degrees}C with the reactant partial pressure in the range of 0.0025-0.01 attn. The predominant catalytic reaction was n-butane isomerization, and this was accompanied at 40{degrees}C by near stoichiometric disproportionation. The C3/C5 molar ratio was generally greater than 1, consistent with conversion of the secondary C5 products. As the temperature increased, the selectivity for isomerization decreased and that for disproportionation increased. In a typical experiment the activity of the catalyst increased for about 1 h on stream and then declined rapidly. The rate maxima as a function of time on stream were taken as a measure of the initial activity of the catalyst. For example, the approximate rate of isomerization of n-butane at the maximum was 4.3 x 10-8 mol/(g of catalyst {center_dot} s) with a feed n-butane partial pressure of 0.0025 atm at 75{degrees}C. With a feed n-butane partial pressure of 0.005 atm at 40{degrees}C and a conversion of 1 1%, the molar ratio of propane to i-butane was 0.03, and with the same feed composition at 100{degrees}C, this ratio at a conversion of 50% was 0.1. The iron- and manganese-promoted solid superacid catalyst is potentially of value for practical low-temperature paraffin isomerization accompanied by disproportionation of n-butane.

Gates, B.C. [Univ. of California, Davis, CA (United States)

1995-12-31T23:59:59.000Z

165

Project quarterly report-8, January 1978--March 1978  

DOE Green Energy (OSTI)

Progress made by the Low-Cost Silicon Solar Array Project during the period January through March 1978 is described. Task reports on silicon material processing, large-area silicon sheet development, encapsulation materials testing and development, project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts are included.

Not Available

1978-01-01T23:59:59.000Z

166

Tennessee energy statistics quarterly, fourth quarter 1983  

Science Conference Proceedings (OSTI)

County-level energy data are shown as well as state statistics on three substantive areas of the energy flow: production; consumption; and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity. Historical data in this volume cover the production and utilization of major energy supplies by fuel type and economic sectors, as well as other energy data such as prices and fuel distribution.

Finley, T.F. III; Hensley, B.D.; Trotter, T

1983-01-01T23:59:59.000Z

167

Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994  

DOE Green Energy (OSTI)

The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

Not Available

1994-05-01T23:59:59.000Z

168

Pinellas Environmental Restoration Project Quarterly Progress Report, Sitewide, January through March 2004  

Office of Legacy Management (LM)

44 44 2004 GJ - - U.S. Department of Energy Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young-Rainey STAR Center January Through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management N00074400 DOE-LM/GJ644-2004 Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young - Rainey STAR Center January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491

169

Kotzebue Electric Association Wind Power Project Fourth-Year Operating Experience: 2002-2003: U.S. Department of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the fourth-year operating experience and expansion of the 0.76 MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2003-12-15T23:59:59.000Z

170

Western Gas Sands Project. Quarterly basin activities report  

SciTech Connect

A summation is presented of the coring program site identification, and drilling and testing activity in the four primary study areas of the Western Gas Sands Project (WGSP). Pertinent information for January, February, and March, 1978 is included for each study area. The areas are the Northern Great Plains Province, the Greater Green River Basin, the Piceance Basin, and the Uinta Basin.

1978-04-01T23:59:59.000Z

171

Minnesota agripower project. Quarterly report, April--June 1997  

DOE Green Energy (OSTI)

The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

Baloun, J.

1997-07-01T23:59:59.000Z

172

National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Winter 2011-2012 (Newsletter)  

DOE Green Energy (OSTI)

Winter 2011-2012 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: 34th Symposium on Biotechnology for Fuels and Chemicals; feasibility of NIR spectroscopy-based rapid feedstock reactive screening; demonstrating integrated pilot-scale biomass conversion. The Biochemical Process Integration Task focuses on integrating the processing steps in enzyme-based lignocellulose conversion technology. This project supports the U.S. Department of Energy's efforts to foster development, demonstration, and deployment of 'biochemical platform' biorefineries that economically produce ethanol or other fuels, as well as commodity sugars and a variety of other chemical products, from renewable lignocellulosic biomass.

Not Available

2012-04-01T23:59:59.000Z

173

Pinellas Environmental Restoration Project Quarterly Progress Report, 4.5 Acre January through March 2004  

Office of Legacy Management (LM)

January through March 2004 January through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management DOE LM/ 645 2004 GJ - - N0074500 DOE-LM/GJ645-2004 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado Document Number N0074500 Contents U.S. Department of Energy 4.5 Acre Site Quarterly Progress Report

174

Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1982--September 30, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1982--September 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

1983-03-01T23:59:59.000Z

175

Heber geothermal binary demonstration project quarterly technical progress report, April 1, 1982--June 30, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1982-June 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

176

Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1981--September 30, 1981  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1981, through September 30, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the US Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

177

Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1982--December 31, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1982--December 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

1983-05-01T23:59:59.000Z

178

Heber geothermal binary demonstration project quarterly technical progress report, January 1, 1982--March 31, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of January 1, 1982, through March 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

179

Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1981--December 31, 1981  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1981, through December 31, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

180

Western Gas Sands Project. Quarterly basin activities report  

SciTech Connect

A summation of information is presented on geology and drilling activity in the four primary study areas of the Western Gas Sands Project. The areas of interest are the Greater Green River Basin, the Piceance Basin, the Uinta Basin, and the Northern Great Plains Province. Drilling activity is discussed for the months of October, November, and December, 1977, with the major emphasis on wells located in low permeability sandstone areas, having significant gas production and utilizing hydraulic fracturing treatments. The drilling information was obtained primarily from ''The Rocky Mountain Region Report'' published by Petroleum Information Corporation on a daily basis. Another source of information was the ''Montana Oil and Gas Journal'' which is released weekly.

1978-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Great Plains Coal Gasification Project. Quarterly technical progress report  

Science Conference Proceedings (OSTI)

Overall, the GPGA facility has performed well, as shown by the production figures. Methanation, product gas compression, oxygen production, phenol recovery, ammonia recovery and the gasifiers are noteworthy examples of units which have been started up and operated with few problems. In other units, significant deficiencies have been uncovered which have required modification. Some of these items had a negative impact on SNG production. Additionally, GPGA undertook a program to improve reliability, safety and reduce odor emissions. Reliable high pressure steam generation is essential for maintaining acceptable plant on-stream factors. Consequently, several projects were undertaken which will improve the safety of operation and firefighting capabilities at the main boiler units. Also, a significant upgrade of the boiler instrumentation was started to ensure good control and operating flexibility. The cooling water system was designed to meet both plant cooling needs and provide treatment of wastewater streams. Plugging of tower packing and heat exchanger tubes, as well as odor emissions resulted from the heavy biological activity in this system. Fine mesh traveling screens, wind wall louvers, ceramic packing, mist eliminators, and exchanger chemical cleaning connections are the notable modifications begun during the period. Due to condensate problems and the greater than expected production of gas liquor, wastewater treatment systems were operated at near capacity. Additional pumping capability, a second deepwell, additional storage ponds, modifications to the evaporator distillate system and the vacuum deaerator are several projects undertaken to reduce loading on the system. The on-stream factor of ash handling has been low due to pluggage problems.

Not Available

1984-12-31T23:59:59.000Z

182

Evaluation of selected chemical processes for production of low-cost silicon. Fourth quarterly progress report, July 1, 1976--September 30, 1976  

DOE Green Energy (OSTI)

The effort this quarter has been devoted to the operation of a ''miniplant'' for the preparation of silicon by the zinc reduction of silicon tetrachloride. This is in accordance with a previous decision to concentrate all development work on this process because it was concluded to have an economic advantage over other candidate processes explored earlier. Of the 22 runs made in the newly designed equipment this quarter, 12 were carried out under conditions which yielded meaningful data. (WDM)

Blocher, J.M. Jr.; Browning, M.F.; Wilson, W.J.; Carmichael, D.C.

1976-10-21T23:59:59.000Z

183

Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project  

SciTech Connect

The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

NONE

1992-09-01T23:59:59.000Z

184

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth...  

Open Energy Info (EERE)

Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and...

185

MHD Integrated Topping Cycle Project. Eighteenth quarterly technical progress report, November 1, 1991--January 31, 1992  

DOE Green Energy (OSTI)

This eighteenth quarterly technical progress report of the MHD Integrated Topping cycle Project presents the accomplishments during the period November 1, 1991 to January 31, 1992. The precombustor is fully assembled. Manufacturing of all slagging stage components has been completed. All cooling panels were welded in place and the panel/shell gap was filled with RTV. Final combustor assembly is in progress. The low pressure cooling subsystem (LPCS) was delivered to the CDIF. Second stage brazing issues were resolved. The construction of the two anode power cabinets was completed.

Not Available

1992-07-01T23:59:59.000Z

186

Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995  

DOE Green Energy (OSTI)

The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

NONE

1995-05-01T23:59:59.000Z

187

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

188

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

189

Tampa Electric Company - DOE IGCC project. Quarterly report, July 1 - September 30, 1996  

SciTech Connect

The third quarter of 1996 has resulted in the completion of over five (5) years of extensive project development, design, construction and start-up of the 250 MW Polk Power Station Unit {number_sign}1 IGCC Project. the combined cycle performance test was completed on June 18, 1996. This test demonstrated that on distillate fuel, the combined cycle achieved a net output of 222,299 KW with a net heat rate of 6,868 BTU/KW. This is about 3.86% and 2.76% better than the guaranteed values of 214,040 KW and 7,063 BTU/KW respectively. During the third quarter of 1996, the combustion turbine was run on syngas two (2) different times for a combined total of about seven hours. Attachment {number_sign}4 shows graphically the transfer from oil to syngas. Emission levels were generally acceptable even though no specific emissions tuning was completed by GE and the emissions monitoring equipment was not yet completely operational.

1996-12-31T23:59:59.000Z

190

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 4th Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

191

Great Plains Gasification Associates. Quarterly technical and environmental report, Great Plains coal gasification project, Mercer County, North Dakota, second quarter, 1983  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet Great Plains Gasification Associate's start-up and coal delivery dates as well as the completion of the pipeline. Home Office engineering is essentially complete for the Plant. The remaining engineering tasks will involve field support activities and special projects. A substantial amount of construction progress was achieved during the second quarter. Although construction is still slightly behind schedule for the Plant, it is currently forecasted that construction will be back on schedule by the end of October, 1983. Start-up activities are continuing at a rapid pace. The current emphasis is on precommissioning planning and the development and implementation of the computer systems required to run the plant. Mine development activities remain on schedule. Almost all of the environmental permitting for the construction phase is complete. Engineering for the pipeline is complete. Construction started this quarter and should be completed by August 15, 1983.

Not Available

1983-01-01T23:59:59.000Z

192

H-Area, K-Area, and Par Pond Sewage Sludge Application Sites Groundwater Monitoring Report. Fourth quarter 1994 and 1994 summary  

SciTech Connect

Groundwater samples from the three wells at the H-Area Sewage Sludge Application Site (HSS wells) are analyzed quarterly for constituents as required by South Carolina Department of Health and Environmental Control Construction Permit 12,076. Samples from the three wells at the K-Area Sewage Sludge Application Site (KSS wells) and the three wells at the Par Pond Sewage Sludge Application Site (PSS wells) are analyzed quarterly for constituents required by SCDHEC Construction Permit 13,173. All samples are also analyzed as requested for other constituents as part of the Savannah River Site Groundwater Monitoring Program. Annual analyses for other constituents, primarily metals. also are required by the permits.

Chase, J.A.

1995-04-01T23:59:59.000Z

193

Federal assistance program. Quarterly project progress report, January 1998--March 1998  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-04-01T23:59:59.000Z

194

Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1997-01-01T23:59:59.000Z

195

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #13, October-December 2006  

DOE Green Energy (OSTI)

Volume 13 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

Schell, D. J.

2007-01-01T23:59:59.000Z

196

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #14, January - March 2007  

DOE Green Energy (OSTI)

Volume 14 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

Schell, D.

2007-04-01T23:59:59.000Z

197

DOBEIA-0202(83/4Q) Short-Term Energy Outlook Quarterly Projections  

Gasoline and Diesel Fuel Update (EIA)

DOBEIA-0202(83/4Q) DOBEIA-0202(83/4Q) Short-Term Energy Outlook Quarterly Projections November 1983 Energy Information Administration Washington, D.C. t rt jrt .ort lort .lort lort lort lort <.ort ort Tt- .-m .erm -Term -Term Term Term Term Term Term Term Term Term Term Term Term Term Term Nrm ,iergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Short Short Short Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short Short Short Short Short-

198

DOE/EIA-0202(84/2QH Short-Term Energy Outlook Quarterly Projections  

Gasoline and Diesel Fuel Update (EIA)

2QH 2QH Short-Term Energy Outlook Quarterly Projections May 1984 Published: June 1984 Energy Information Administration Washington, D.C. t rt jrt .ort lort .iort .iort- iort- iort- '.ort- ort- .m .erm Term Term Term Term Term Term Term Term Term Term Term Term i-Term rTerm -Term xrm uergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Short-Tern Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term

199

DOE/EIA-0202(85/1Q) Short-Term Energy Outlook Quarterly Projections  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Short-Term Energy Outlook Quarterly Projections January 1985 Published: February 1985 Energy Information Administration Washington, D.C. t rt jrt .ort lort lort lort nort lort *.ort ort Tt .m .erm -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term uergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short Short

200

DOE/EIA-0202(84/4Q) Short-Term Energy Outlook Quarterly Projections  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Short-Term Energy Outlook Quarterly Projections October 1984 Published: November 1984 Energy Information Administration Washington, D.C. t rt jrt .ort lort iort lort iort lort \ort ort Tt .erm Term Term Term Term Term Term Term Term Term Term Term Term Term -Term -Term xrm nergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short- Short Short- Short- Short Short Short Short Short Short

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE/EIA-0202(90/2Q) SHOET-TERM QUARTERLY PROJECTIONS  

Gasoline and Diesel Fuel Update (EIA)

0/2Q) 0/2Q) SHOET-TERM QUARTERLY PROJECTIONS This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunications Device for the Hearing Impaired Only: (202) 586-1181 8 a.m. - 5 p.m., eastern time, M-F

202

DOE/EIA-0202(84/1Q) Short-Term Energy Outlook Quarterly Projections  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Short-Term Energy Outlook Quarterly Projections February 1984 Published: March 1984 Energy Information Administration Washington, D.C. t rt jrt- .ort- iort- iort- .iort- iort- lort-

203

MHD Integrated Topping Cycle Project. Seventeenth quarterly technical progress report, August 1, 1991--October 31, 1991  

Science Conference Proceedings (OSTI)

This seventeenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period August 1, 1991 to October 31, 1991. Manufacturing of the prototypical combustor pressure shell has been completed including leak, proof, and assembly fit checking. Manufacturing of forty-five cooling panels was also completed including leak, proof, and flow testing. All precombustor internal components (combustion can baffle and swirl box) were received and checked, and integration of the components was initiated. A decision was made regarding the primary and backup designs for the 1A4 channel. The assembly of the channel related prototypical hardware continued. The cathode wall electrical wiring is now complete. The mechanical design of the diffuser has been completed.

Not Available

1992-07-01T23:59:59.000Z

204

Low-Cost Solar Array (LSA) Project. Project quarterly report No. 9, April--June 1978  

DOE Green Energy (OSTI)

Progress made by the Low-Cost Solar Array Project during the period April through June 1978 is described. It includes reports on silicon material processing, large-area silicon sheet development, encapsulation materials testing and development, project engineering and operations activities, and manufacturing techniques, plus the steps taken to integrate these efforts.

Not Available

1978-01-01T23:59:59.000Z

205

Geothermal direct-heat utilization assistance. Federal Assistance Program, Quarterly project progress report, October--December 1994  

DOE Green Energy (OSTI)

The report summarizes activities of the Geo-Heat Center (GHC) at Oregon Institute of Technology for the first quarter of Fiscal Year 1995. It describes contacts with parties during this period related to assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research is also being conducted on geothermal energy cost evaluation, low-temperature geothermal resource assessment, use of silica waste from the Cerro Prieto geothermal field as construction materials and geothermal heat pumps. Outreach activities include the publication of a quarterly Bulletin on direct heat applications and dissemination of information on low-temperature geothermal resources and utilization.

Not Available

1994-12-31T23:59:59.000Z

206

DOE/SC-ARM-11-001 ARM Climate Research Facility Quarterly Instrument...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facility Quarterly Instrument Report Fourth Quarter: October 1-December 30, 2010 JW Voyles January 2011 Work supported by the U.S. Department of Energy, Office of...

207

MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991  

DOE Green Energy (OSTI)

The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

Not Available

1992-03-01T23:59:59.000Z

208

Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993  

Science Conference Proceedings (OSTI)

This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

Not Available

1993-12-31T23:59:59.000Z

209

Great Plains Coal Gasification Project, Mercer County, North Dakota. Quarterly technical and environmental report, third quarter 1984  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet Great Plains Gasification Associates (GPGA's) full gas production date. Gasification Plant - Detailed engineering is complete. Construction is 99% complete. Start-up operations are proceeding well. SNG was delivered to the product pipeline this quarter. The only remaining plant permit is the Permit to Operate, which is expected to be issued in late 1985. Quality Assurance/Quality Control Activities included major equipment inspections, further development of welding procedures, and continuation of the corrosion control/materials evaluation program. Freedom mine development activities remain on schedule.

Not Available

1984-09-01T23:59:59.000Z

210

Integrated Low Emissions Cleanup system for direct coal fueled turbines, (moving bed, fluid bed contactor/ceramic filter). Twenty-fourth quarterly status report, July--September 1993  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge: a baseline ceramic barrier filter ILEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300{degree}F. This document reports the status of a program in the nineteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1993-12-31T23:59:59.000Z

211

Hydrogen-engine performance-analysis project. Second quarterly report first year of program  

DOE Green Energy (OSTI)

The objective of this research effort is to obtain the design data-base covering performance, operational characteristics and emissions essential for making a rational decision regarding the selection and design of prototype hydrogen-fueled, air-breathing engines capable of being manufactured for general automotive use. To this end hydrogen-fueled internal combustion engines were divided into fourteen subgroups. An engine representative of each subgroup will be tested during the course of the three year program. The Project Program Plan calls for investigation of pre-intake valve closing fuel ingestion (Pre IVC) hydrogen-fueled engines during the first two years. Work accomplished during the second three months of the project is reported. Activities during the second quarter concentrated on: final apparatus debugging, engine break-in, preliminary testing to determine qualitative apparatus operating characteristics, rearranging of the proposal test schedule and performing of tests with engine 1 (carbureted, throttled, no H/sub 2/O injection, no EGR and engine 4 (carbureted, unthrottled, no H/sub 2/O injection, no EGR. The details of these activities are described.

Adt, R.R. Jr.; Swain, M.R.; Pappas, J.M.

1977-06-01T23:59:59.000Z

212

Great Plains Coal Gasification Project, Mercer County, North Dakota. Quarterly technical and environmental report, second quarter, 1984. [Mercer County, North Dakota  

SciTech Connect

Project activities remain on schedule to meet Great Plains Gasification Associates' full gas production date. Detailed engineering is complete for the gasification plant. The only remaining engineering tasks involve field support activities and special projects. Construction is nearly complete. The majority of the remaining tasks involve civil, painting and electrical work. Start-up operations are proceeding very well. Many significant achievements were accomplished during the quarter. Coal was successfully gasified with oxygen. All of the first train's seven gasifiers completed successful production test runs. The only remaining plant permit is the Permit to Operate, which is expected to be issued in late 1985. Quality assurance/quality control activities included major equipment inspections, development of welding procedures and equipment turnover inspections. Freedom Mine development activities remain on schedule.

Not Available

1984-01-01T23:59:59.000Z

213

Development of a polysilicon process based on chemical vapor deposition. Phase 1. Fourth quarterly progress report, 1 July-30 September 1980  

DOE Green Energy (OSTI)

The goal of this program is to demonstrate that a dichlorosilane-based reductive chemical vapor deposition (CVD) process is capable of producing, at low cost, high quality polycrystalline silicon for use in the manufacture of high efficiency solar cells. The feasibility of silicon generation from dichlorosilane (DCS) has been well established. The feasibility and optimization portions of the experimental reactor program have been completed, with a number of runs having been conducted over a broad range of conditions in an experimental CVD reactor. Activities relating to feed of commercially purchased DCS to an intermediate sized reactor and to construction of a Process Development Unit (PDU) to generate and feed DCS to one or more production scale reactors were suspended during the previous quarter because of the receipt of new safety-related information about DCS from Hazards Research Corp. Experimental data generated by Hazards Research Corp. indicate that DCS/air mixtures possess about four times the explosive severity potential as hydrogen/air mixtures, and that DCS/air mixtures are very readily ignited. As a consequence of this new information, designs and procedures for the intermediate reactor feed and PDU tasks were deemed inadequate and new designs incorporating new safety-related elements are being formulated. A preliminary economic evaluation of the Hemlock Semiconductor process has been completed. The analysis for a plant to generate 1000 metric tonne of silicon indicates a plant investment of $21.9 M, and a product selling price of $19.85/kg.

Sharp, K.; Arvidson, A.; Sawyer, D.

1980-12-01T23:59:59.000Z

214

Coal air turbine ``CAT`` program, invention 604. Fifth quarter project report, October--December 1995  

SciTech Connect

The primary objective of this ``CAT`` (Coal Air Turbine) project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the CAT system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a CAT plant are proven, and the integration of the components into a complete plant is the only new developmental activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a commercial plant before the viability of a new concept is accepted. To satisfy this requirement the construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate for a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept. The major components of CAT plants are an air turbine, a heater of compressed air, a coal combustion system, means to recover waste heat and a steam turbine when appropriate. The plant burns raw coal in a fluid bed at atmospheric pressure. The air turbine operates on clean compressed air heated inside tubes immersed in the fluid bed. Progress during the fifth quarter is described.

Foster-Pegg, R.W.

1995-12-31T23:59:59.000Z

215

GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994  

Science Conference Proceedings (OSTI)

Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

Anderson, R.N.

1994-04-15T23:59:59.000Z

216

MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991  

DOE Green Energy (OSTI)

This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

Not Available

1992-02-01T23:59:59.000Z

217

Liquid natural gas as a transportation fuel in the heavy trucking industry. Fourth quarterly progress report, April 1, 1995--June 30, 1995  

DOE Green Energy (OSTI)

This project encompasses the first year of a proposed three year project with emphasis focused on LNG research issues that may be categorized as direct diesel replacement with LNG fuel, and long term storage/utilization of LNG vent gases produced by tank storage and fueling/handling operation. In addition, a potential new utilization of LNG fuel has been found, as a part of this work on the fundamental nature of adsorption of LNG vent gases in higher hydrocarbons; follow on research for this and other related applications and transfer of technology are proceeding at this time.

Sutton, W.H.

1995-09-01T23:59:59.000Z

218

Natural Gas Imports and Exports - Quarterly Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Imports and Natural Gas Imports and Exports - Quarterly Reports Natural Gas Imports and Exports - Quarterly Reports September 13, 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 July 1, 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 March 29, 2013 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 December 31, 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 September 28, 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012

219

EVLA Memo No. 89 The EVLA Outdoor Antenna Test Range Project  

E-Print Network (OSTI)

Projected Costs if new range equipment were purchased Total Material and Equipment costs (to date) for building test range: Funds required to complete project Total NRAO Costs (estimate) without NMT involvementEVLA Memo No. 89 The EVLA Outdoor Antenna Test Range Project: Fourth Quarter 2004, Progress Report

Groppi, Christopher

220

500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NOx) emissions from coal-fired boilers. Technical progress report, fourth quarter, 1994, October 1994--December 1994  

Science Conference Proceedings (OSTI)

This quarterly report discusses the technical progress of an innovative Clean Coal Technology (ICCT) demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NOx) emissions from coal-fired boilers. The project is being conducted at Georgia Power Company`s Plant Hammond Unit 4 located near Rome, Georgia. The primary goal of this project is the characterization of the low NOx combustion equipment through the collection and analysis of long-term emissions data. The project provides a stepwise evaluation of the following NOx reduction technologies: Advanced overfire air (AOFA), Low NOx burners (LNB), LNB with AOFA, and Advanced Digital Controls and Optimization Strategies. The project has completed the baseline, AOFA, LNB, and LNB+AOFA test segments, fulfilling all testing originally proposed to DOE. Analysis of the LNB long-term data collected show the full load NOx emission levels to be near 0.65 lb/MBtu. This NOx level represents a 48 percent reduction when compared to the baseline, full load value of 1.24 lb/MBtu. These reductions were sustainable over the long-term test period and were consistent over the entire load range. Full load, fly ash LOI values in the LNB configuration were near 8 percent compared to 5 percent for baseline. Results from the LNB+AOFA phase indicate that full load NOx emissions are approximately 0.40 lb/MBtu with a corresponding fly ash LOI value of near 8 percent. Although this NOx level represents a 67 percent reduction from baseline levels, a substantial portion of the incremental change in NOx emissions between the LNB and LNB+AOFA configurations was the result of operational changes and not the result of the AOFA system. Phase 4 of the project is now underway.

NONE

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Great Plains Gasification Associates quarterly technical and environmental report, Great Plains Coal-Gasification Project, Mercer County, North Dakota. First quarter, 1983. [Mercer County, ND  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet GPGA's start-up and coal delivery dates as well as the completion of the pipeline. Engineering is essentially on schedule and complete for the Plant. Most of the key engineering goals needed to support the construction phase were completed during the first quarter. A substantial amount of construction progress has been accomplished. Although overall construction is behind schedule, it is currently forecasted that construction will be back on schedule by the end of October, 1983. Start-Up Planning is progressing at a rapid pace. The current emphasis is on consolidating construction planning and completion in accordance with detailed start-up scheduling requirements. Work is also being directed to the development and finalization of plant operating manuals and a materials management system. Mine development activities remain on schedule. Most of the environmental permitting for the construction phase of the project has been completed. Engineering for the pipeline is complete. Construction should commence in early May and should be completed one month prior to the earliest need date.

Not Available

1983-01-01T23:59:59.000Z

222

A low energy continuous reactor separator for the production of ethanol from starch, molasses and cellulose. Fourth quarterly report to the Energy Related Inventions Program, January 16--March 15, 1995  

DOE Green Energy (OSTI)

Progress for the previous quarter is reported concerning design and development of a 24,000 liter continuous stirred reactor-separator and a 50 liter pilot plant.

NONE

1995-06-16T23:59:59.000Z

223

Lessons Learned Quarterly Report, December 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1998 December 1998 Lessons Learned Quarterly Report, December 1998 Welcome to the fourth quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: New and Improved NEPA Compliance Guide Issued in 2 Volumes NEPA Community Meeting in Las Vegas Managing Baseline Environmental Information for the Sandia Site-wide EIS Water Project Mini-guidance Regulatory Compliance and NEPA Procedures for an Environmental Critique and Synopsis, and a Supplement Analysis EPA Broadens Voluntary EIS Policy Historic Preservation Proposed Regulatory Revision Withdrawn Acting Chair at CEQ Training Opportunities Environmental Lessons Learned Seminars Litigation Updates DOE NEPA Community Members in Transition Annual NEPA Planning Summaries Performance-based Statements of Work

224

Silicon Materials Task of the Low Cost Solar Array Project (part 2). Third quarterly report, 1 April 1976--30 June 1976  

DOE Green Energy (OSTI)

The objective of this program is to develop and define purity requirements for solar grade silicon by exploring the effects of metal impurities on the performance of terrestrial silicon solar cells. During this quarter the growth of all first, second, and nearly all third generation ingots was completed and the growth of fourth generation ingots was initiated. Several boron-doped silicon dendritic web baseline samples were grown as well as one web doped with chromium. Chemical analysis of the ingots is proceeding on schedule, though, as expected, difficulties in assessing the impurity levels of lightly-doped ingots have developed. Lifetime measurements were completed for all 38 ingots grown to date. (WDM)

Hopkins, R.H.; Davis, J.R.; Rai-Choudhury, P.; Blais, P.D.; McHugh, J.P.; McCormick, J.R.

1976-01-01T23:59:59.000Z

225

Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995  

DOE Green Energy (OSTI)

The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

NONE

1996-02-01T23:59:59.000Z

226

Environmental Biosciences Program Fourth Quarter Report  

Science Conference Proceedings (OSTI)

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific program, employing a range of research initiatives to identify, study and resolve environmental health risk issues. These initiatives are consistent with the Medical University's role as a comprehensive state-supported health sciences institution and the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable the Medical University to be a national resource for the scientific investigation of environmental health issues. EBP's success in convening worldwide scientific expertise is due in part to the inherent credibility the Medical University brings to the process of addressing these complex issues.

Lawrence C. Mohr, M.d.

2003-04-30T23:59:59.000Z

227

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1994--September 1994  

DOE Green Energy (OSTI)

This paper is a third quarter 1994 report of activities of the Geo-Heat Center of Oregon Institute of Technology. It describes contacts with parties during this period related to assistance with geothermal direct heat applications. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources, and equipment. Research is also being conducted on failures of vertical lineshaft turbines in geothermal wells.

Not Available

1994-10-01T23:59:59.000Z

228

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 29, quarter ending December 31, 1981  

SciTech Connect

Highlights of progress accomplished during the quarter ending December, 1981, are summarized in this report. Discussion is presented under the following headings: chemical flooding - field projects; chemical flooding - supporting research; carbon dioxide injection - field projects; carbon dioxide injection - supporting research; thermal/heavy oil - field projects and supporting research; resource assessment technology; extraction technology; environmental aspects; petroleum processing technology; microbial enhanced oil recovery; and improved drilling technology. (DMC)

Linville, B. (ed.)

1982-05-01T23:59:59.000Z

229

Heat Extraction Project, geothermal reservoir engineering research at Stanford. Fourth annual report, January 1, 1988--December 1, 1988  

DOE Green Energy (OSTI)

The main objective of the SGP Heat Extraction Project is to provide a means for estimating the thermal behavior of geothermal fluids produced from fractured hydrothermal resources. The methods are based on estimated thermal properties of the reservoir components, reservoir management planning of production and reinjection, and the mixing of reservoir fluids: geothermal, resource fluid cooled by drawdown and infiltrating groundwater, and reinjected recharge heated by sweep flow through the reservoir formation. Several reports and publications, listed in Appendix A, describe the development of the analytical methods which were part of five Engineer and PhD dissertations, and the results from many applications of the methods to achieve the project objectives. The Heat Extraction Project is to evaluate the thermal properties of fractured geothermal resource and forecasted effects of reinjection recharge into operating reservoirs.

Kruger, P.

1989-01-01T23:59:59.000Z

230

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 34, quarter ending March 31, 1983  

SciTech Connect

Progress achieved for the quarter ending March 1983 are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; and thermal/heavy oil. In addition, progress reports are presented for: resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovered by gravity mining; improved drilling technology; and general supporting research. (ATT)

Linville, B. (ed.)

1983-07-01T23:59:59.000Z

231

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 36 for quarter ending September 30, 1983  

SciTech Connect

Progress reports for the quarter ending September 30, 1983, are presented for field projects and supported research for the following: chemical flooding; carbon dioxide injection; thermal/heavy oil; resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovery by gravity mining; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1984-03-01T23:59:59.000Z

232

Contracts for field projects and supporting research on enhanced oil recovery, reporting period January--March 1991. Progress review No. 66, quarter ending March 31, 1991  

SciTech Connect

Contracts for field projects and supporting research on Enhanced Oil Recovery for the quarter ending March 31, 1991 are reviewed. A list of available publications is listed. Research topics include microbial EOR, foam injection, thermal recovery, surfactant flooding, reservoir rock characterization, and more.

Not Available

1992-03-01T23:59:59.000Z

233

Microsoft Word - Quarterly Report 4- DOE Hydrates.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

10195 10195 Quarterly Research Performance Progress Report (Period ending 8/31/2013) Methane Hydrate Field Program Project Period (October 1, 2012 - December 31, 2013) Submitted by: Greg Myers - Principal Investigator _________________________ Signature Consortium for Ocean Leadership DUNS #:046862582 1201 New York Avenue, NW Fourth Floor e-mail: gmyers@oceanleadership.org Phone number: (202) 448-1258 Prepared for: United States Department of Energy National Energy Technology Laboratory October 31, 2013 Office of Fossil Energy 2 ACCOMPLISHMENTS: The primary objective of the project is to conduct scientific planning that will help enable future scientific ocean drilling, coring, logging, testing and analytical activities to assess the geologic occurrence, regional

234

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #17, October-December 2007  

DOE Green Energy (OSTI)

October to December, 2007 edition of the newsletter of the Biochemical Platform Process Integration project.

Schell, D.

2008-01-01T23:59:59.000Z

235

Geothermal overview project: preliminary environmental assessments. Quarterly progress report, October 1, 1978--December 31, 1978  

DOE Green Energy (OSTI)

The following are included: geothermal overview projects initiated in FY 1979, geothermal overview projects initiated in FY 1978, the agenda and participants in the overview planning meeting, the Oregon status reports, and the Hawaii status reports. (MHR)

Phelps, P.L.

1979-01-03T23:59:59.000Z

236

Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995  

Science Conference Proceedings (OSTI)

This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation.

NONE

1995-08-01T23:59:59.000Z

237

Geothermal policy project. Quarterly report, September 1, 1980-November 30, 1980  

DOE Green Energy (OSTI)

Efforts continued to carry forward policy development in existing project states. Follow-up contacts were made with most project states, and state visits and meetings occurred in eight project states. Several state-specific documents and one background document, geothermal Policies in Selected States, were prepared during this reporting period. In Yakima, Washington, the project cosponsored a geothermal symposium with the Washington State Energy Office, in addition to attending several other geothermal meetings and conferences.

Not Available

1981-01-01T23:59:59.000Z

238

Geothermal policy project. Quarterly report, November 1, 1979-January 31, 1980  

DOE Green Energy (OSTI)

Solicitation letters for geothermal and ground water heat-pump energy were sent to ten new states, and initial contact was made in two other states, Arizona and Nevada, concerning 1980 project activities. Follow-up contacts were made with several existing project states, and state meetings and workshops were held in five project states. The Preliminary Geothermal Profile for the state of Nevada as well as other project materials were prepared.

Sacarto, D.M.

1980-02-01T23:59:59.000Z

239

NEPA Lessons Learned Quarterly Report. December 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 More Inside on NEPA 35 CEQ Chairman Connaughton's Address ......... 5 Plenary Sessions.............................................. 6 Training Sessions .......................................... 14 Breakout Sessions ......................................... 15 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2005 December 5, 2005; Issue No. 45

240

Minnesota agri-power project. Quarterly report, January--March 1997  

DOE Green Energy (OSTI)

This project involves the growing of trial quantities of alfalfa for gasification pilot plant tests and the use of by-products of alfalfa plants as animal feeds for beef and dairy cattle and turkeys. The various tasks under this project are described. Tasks are: design; review and confirm feedstock supply plan; performance guarantees and warranties; sales contracts; site plan construction and environmental permits report; environmental monitoring plan; and project management, engineering, and administration.

Baloun, J.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Plutonium residue recovery (PuRR) project: Quarterly progress report, January--March 1989  

Science Conference Proceedings (OSTI)

This quarterly report presents experimental and conceptual design information covering the development of a new pyrochemical process to recover weapons-grade plutonium from and reduce the amount of aqueous process intractable transuranic (TRU) residues now stored at Department of Energy facilities. During this period, experiments were performed in which zinc-calcium alloys were used to reduce the Rocky Flats ash heel. They offer potential advantages to reduce wastes because of reagent recycle. One reduction run using zinc-10 wt % calcium alloy was 99.7% complete. In another run, the calcium was titrated into the zinc alloy to observe the stepwise progression of the reduction. In support of planned electrochemical recovery of calcium, experiments were performed to determine the solubility of calcium CaCl/sub 2/-CaF/sub 2/ in the presence of zinc-calcium alloys. Also, initial experiments with reference electrodes for electrochemical operations or titration-type chemical reactions were encouraging. Pyrolytic boron nitride and vitreous carbon underwent preliminary evaluation for use as materials in the equipment under development. Electrochemical cells were designed for recovering calcium from the salt used in the oxide reduction step. Calculations were made to estimate activity coefficients for plutonium in calcium-zinc alloys. 16 refs., 9 figs., 5 tabs.

Alire, R.M.; Gregg, D.W.; Hickman, R.G.; Kuhl, W.D.; Landrum, J.H.; Johnson, G.K.; Johnson, I.; Mulcahey, T.P.; Pierce, R.D.; Poa, D.S.

1989-05-26T23:59:59.000Z

242

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1993-08-15T23:59:59.000Z

243

Hanford Environmental Dose Reconstruction Project. Quarterly report, June--August 1993  

SciTech Connect

The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

Cannon, S.D.; Finch, S.M. [comps.

1993-10-01T23:59:59.000Z

244

Plutonium Residue Recovery (PuRR) Project: Quarterly progress report, July-September 1988  

Science Conference Proceedings (OSTI)

During this quarter, process development activities were concentrated on methods for recycling the salt and alloy reagents used by PuRR. Promising techniques were identified for further investigation, development and refinement. Processes for the recycling of salts, in particular, were also shown to be of potential benefit in reducing waste streams in the current plutonium metal production cycle. At Argonne National Laboratory (ANL), the first attempt at reduction of ash heels was made. The recovery of plutonium from this most intractable of residues was gratifyingly high. Magnesium was used for reduction of ash heel into a zinc alloy, and calcium was used for reduction into a copper-magnesium alloy. For the zinc-magnesium run 99.9% reduction was achieved in two reduction stages. For the copper-magnesium-calcium run, 99.8% reduction was obtained in a single stage. The reduction alloy from the copper-magnesium-calcium system was subjected to salt extraction by reaction with CdCl/sub 2/. Only 96.5% of the reduced plutonium was extracted. Quantitative extraction was expected; the cause for the incomplete extraction will be investigated. A similar salt extraction will be performed with the reduction ingot from the zinc-magnesium system. At Lawrence Livermore National Laboratory (LLNL), further progress was made toward readying the gloveboxes in the Plutonium Facility for use. Preliminary steps were taken to prepare ash-heel residues for experiments to attempt gross mechanical separation as a head-end stage for PuRR. 3 refs., 3 figs.

Pittenger, L.C.; Alire, R.M.; Coops, M.S.; Landrum, J.H.; Priest, R.E.; Thompson, D.S.; Gregg, D.W.; Pierce, R.D.; Johnson, G.K.; Mulcahey, T.P.

1988-12-12T23:59:59.000Z

245

Electrochemical photovoltaic cells. Project 65021 quarterly technical progress report, October 15, 1979-January 15, 1980  

DOE Green Energy (OSTI)

During the third quarter of this program, liquid junction devices based upon the semiconductors MoSe/sub 2/, MoS/sub 2/, GaAs, and CdSe have been evaluated. Lifetime testing of MoSe/sub 2/ and MoS/sub 2/ materials in acidic halogen electrolytes at constant current densities of 5 mA/cm/sup 2/ have shown excellent stability to date. For MoSe/sub 2/ single crystals in the electrolyte 1M HBr + 1M Br/sub 2/, short-circuit currents of 63 mA/cm/sup 2/ were achieved with a power conversion efficiency of 6.7% for 200 mW/cm/sup 2/ xenon light illumination. Transient potentiostatic measurements made on MoSe/sub 2/ in this electrolyte indicated little diffusion control, with exchange currents being of the order of 1 to 10 mA/cm/sup 2/. Good photoresponse of MoS/sub 2/ has been observed in 1M HBr + 1M Br/sub 2/. The performance of the natural crystal is comparable to the performance of a single-crystal MoS/sub 2/ in this electrolyte. CdSe thermally evaporated onto porous titanium gave efficiencies of about 4% with 100 mW/cm/sup 2/ xenon illumination. Experimental work was initiated on the dye sensitization of Fe/sub 2/O/sub 3/ and TiO/sub 2/ materials. Of the twelve dyes evaluated, little enhancement of the photoresponse of these materials was noted. Solid-state photoelectrochemical cells have been fabricated, based upon LiI. Cells of the configuration - cond. glass CdSe/LiI + PbI/sub 2//LiI/LiI + C + PbI/sub 2//cond. glass - were fabricated. Photoresponses up to 150 mV were observed.

Ang, P.G.P.; Remick, R.J.; Sammells, A.F.

1980-03-01T23:59:59.000Z

246

MHD Integrated Topping Cycle Project. Fifteenth quarterly technical progress report, February 1991--April 1991  

DOE Green Energy (OSTI)

A summary of the work is excerpted here. Final design of an MHD channel for the ITC program POC test has been completed. The channel was designed to be capable of 1.5 MW {sub e} power output and a lifetime of 2000 hours. Emphasis was placed upon durability and reliability. Hence, specific measures were taken to design against channel damage due to electric faults. The life-limiting issues associated with electrochemical corrosion and erosion of gas-side surfaces were addressed by the use of various materials with proven wear characteristics in a coal-fired MHD channel environment. Pitting of prototypical sidewall coupons was observed in the CDIF workhorse testing. The most likely cause of the observed pitting, water leaks resulting from cooling water tube braze failures, has been remedied. New brazing procedures and isolation of the sidebar gas-side material from water contact will prevent sidebar pitting in the prototypical channel. Water-side corrosion tests reported in this quarterly report include the latest results of tungsten-copper elements at controlled pH, heat flux and voltage levels. In the combustion subsystem, efforts continued to focus on understanding and improving the current levels of slag recovery and seed utilization achieved by the combustor. Analytical support was also provided in the areas of slag rejection system operation, precombustor operation, and oil burner design modification. Channel data analysis activities continued in support of prototypical coupon testing at the CDIF. Analyses are presented on channel wall slagging behavior and sidewall voltage distributions.

Not Available

1992-02-01T23:59:59.000Z

247

LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 13, October 1993--December 1993  

Science Conference Proceedings (OSTI)

In Dec 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In November 1990, after a ten month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the thirteenth Technical Progress Report covering the period October 1, 1993 through the end of December 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in Aug 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1994-05-01T23:59:59.000Z

248

Healy clean coal project. Quarterly report, January 1, 1996--March 31, 1996  

SciTech Connect

The primary objective of the Healy Clean Coal Project is to conduct a cost-sharing project that will demonstrate a new power plant design which features innovative integration of an advanced combustor and heat recovery system coupled with both high- and low-temperature emission control processes. The parties anticipate that if the demonstration project is successful, the technology could become commercialized in the near term and will be capable of (1) achieving significant reductions in the emissions of sulfur dioxide (SO{sub 2}) and the oxides of nitrogen (NO{sub x}) from existing facilities to minimize environmental impacts such as transboundary and interstate pollution and/or (2) providing for future energy needs in an environmentally acceptable manner. The plant design is finalized and all Federal and State permits have been obtained for the construction of the project. Construction of the project is on schedule and is within the budget established following the award of the general construction contract. Off-site manufacturing of equipment, including combustor supply and flue gas desulfurization system supply, is progressing on schedule and as budgeted. This progress report will summarize the significant project development steps taken in the reporting period. The information is derived from the monthly reports, which are a more detailed chronology of events. The report concludes with a forecast of activities for the period of April 1, 1996 through June 30, 1996. 1 tab.

1996-09-01T23:59:59.000Z

249

LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 12, July--September 1993  

Science Conference Proceedings (OSTI)

In December 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The three project phases are: (1) Design; (2A) Long Lead Procurement; (2B) Construction; and (3) Operations. The design phase began on August 8, 1990 and was scheduled to last six months. Phase 2A, long lead procurement, overlaps the design phase and was expected to require about four months to complete. The construction phase was then to continue for another seven months, while the operations phase was scheduled to last about twenty-six months. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the twelfth Technical Progress Report covering the period July 1, 1993 through the end of September 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1993-12-31T23:59:59.000Z

250

Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

NONE

1996-05-01T23:59:59.000Z

251

A study of the relationship of geological formation to the norm. Quarterly technical progress report, July 1, 1995--September 30, 1995  

Science Conference Proceedings (OSTI)

Naturally Occurring Radioactive Materials (NORM) is a common and costly contaminant of produced waters associated with natural gas production and exploration. One way of combating this problem is by identifying the problem beforehand. Our approach to this problem involves development of NORM prediction capabilities based on the geological environment. During the fourth quarter of this project, emphasis was placed on three major tasks; identifying new sampling sites, continuance of preliminary geologic data acquisition, and determining acceptable project revisions.

Bursh, T.P.; Chriss, D.

1995-10-18T23:59:59.000Z

252

Electrochemical photovoltaic cells. Project 65021 quarterly technical progress report, July 15-October 15, 1979  

DOE Green Energy (OSTI)

During the second quarter of this program we have evaluated the photoelectrochemical performance of single-crystal MoSe/sub 2/ and GaAs, polycrystalline CdSe, and cells with RbAg/sub 4/I/sub 5/ solid electrolyte. MoSe/sub 2/ electrode exhibited very good photoresponse in electrolytes containing Br/sup -//Br/sub 2/ redox couple. The photopotential and photocurrent were larger in acid than in alkaline electrolyte. A power conversion efficiency of about 5% was achieved under 200 mW/cm/sup 2/ Xenon light illumination in the acid medium. The catalytic activity of a platinized platinum electrode toward Br/sup -//Br/sub 2/ redox couple was also better in acid electrolyte than in alkaline electrolyte. Higher current densities were obtained in the acid medium. The MoSe/sub 2/ was found to have good stability in acid and alkaline electrolytes; however, it will be necessary to protect the electrolyte against evaporation of the bromine, oxidation by air, or photodecomposition. GaAs was tested in alkaline electrolytes containing Se/sup 2 -//Se/sub n//sup 2 -/, I/sup -//I/sub 2/ or Br/sup -//Br/sub 2/ redox couple and in acid electrolytes containing Fe/sup +2//Fe/sup +3/, Cr/sup +2//Cr/sup +3/, Sn/sup +2//Sn/sup +4/, Cu/sup +1//Cu/sup +2/, Ti/sup +3//Ti/sup +4/, I/sup -//I/sub 2/ or Br/sup -//Br/sub 2/. Large anodic dark currents were observed in solutions containing Sn/sup +2//Sn/sup +4/ or Cu/sup +1//Cu/sup +2/. The large photoeffects found with the other redox couples were usually accompanied by electrode darkening and decrease in photocurrent with time. Polycrystalline electrodes have been made by thermal vacuum evaporation of CdSe on titanium foil or SnO/sub 2/-coated glass. The CdSe still suffered from poor adherence to the substrates and, therefore, poor photoresponse. A solid electrolyte photoelectrochemical cell was fabricated giving photopotentials of about 300 mV at current densities of about 0.1 mA/cm/sup 2/ under 200 mW/cm/sup 2/ Xenon light illumination.

Ang, P.G.P.; Sammells, A.F.

1979-10-01T23:59:59.000Z

253

Healy clean coal project. Quarterly technical progress report No. 5, January--March 1992  

SciTech Connect

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and heat recovery system with both high and low temperature emission control processes. The emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better then the federal New Source Performance Standards. (VC)

Not Available

1992-05-01T23:59:59.000Z

254

Heber geothermal binary demonstration project. Quarterly technical progress report, April 1, 1981-June 30, 1981  

SciTech Connect

Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1981, through June 30, 1981 is documented. Topics covered include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Van De Mark, G.D.

1981-09-01T23:59:59.000Z

255

Healy Clean Coal Project. Quarterly technical progress report, October 1, 1995--December 31, 1995  

SciTech Connect

The primary objective of the Healy Clean Coal Project (HCCP) is to conduct a cost-sharing project that will demonstrate a new power plant design which features innovative integration of an advanced combustor and heat recovery system coupled with both high- and low- temperature emission control processes. The primary equipment elements comprising this new power plant design includes entrained combustion systems coupled with a boiler which will produce low- NO{sub x} levels, and function as a limestone calciner and first-stage SO{sub 2} remover in addition to its heat recovery function; a single spray dryer absorber vessel for second-stage sulfur removal; a baghouse for third-stage sulfur and particulate removal; and a lime activation system which recovers unused reagent from particulate collected in the baghouse. The emission levels of SO{sub 2}, NO{sub x}, and particulate to be demonstrated are expected to be less than the Federal New source Performance Standards. The plant design is finalized and all Federal and State permits have been obtained for construction of the project. Construction of the project is on schedule and is within the budget established following the award of the general construction contract. Off-site manufacturing of equipment, including combustor supply and flue gas desulfurization system supply is progressing on schedule and as budgeted.

1995-12-31T23:59:59.000Z

256

Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, July 1, 1993--September 30, 1993  

SciTech Connect

This document is a brief progress report from each of the research and education projects that are currently funded through the ERWM contract. During third quarter 1993, approval was given by DOE for purchase of equipment. Equipment purchases were initiated and much of the equipment has been received and installed. The committees in charge of coordination of sampling and analyses associated with the collaborative research groups continued to meet and address these issues. Sampling has been done in the lower part of Devil`s Swamp and in the Devil`s Swamp Lake area. In addition, extensive sampling has been done in Bayou Trepagnier and in Bayou St. John. During this period, Tulane and Xavier Universities continued working closely with Oak Ridge National Laboratories (ORNL). The ORNL 1993 summer student internship program was completed. Plans were made for expanding the program to support 8 students next summer. Leonard Price, a Xavier University Chemistry professor and John Walz, a Tulane University Engineering professor each spent 5 weeks at ORNL. During this time these faculty worked with ORNL researchers exploring mutual interests and discussing possible future collaborations. In September, Drs. Carl Gehrs, Lee Shugart and Marshall Adams of ORNL, visited the Tulane and Xavier campuses. They presented two seminars and met with several of the investigators being supported by the ERWM contract. Tulane/Xavier project administrators participated in the Office of Technology Development`s ``New Technologies and Program Exhibition`` in the Rayburn House Office Building on September 23 and in the Hart Senate Office Building on September 27.

1993-11-01T23:59:59.000Z

257

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

258

Environmental Compliance Performance Scorecard - Second Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

259

Low-Cost Silicon Solar Array Project quarterly report-2, July 1976--September 1976  

DOE Green Energy (OSTI)

The potential for future widespread use of photovoltaic systems for the generation of electric power was the motivation for the establishment, in January 1975, of the Photovoltaic Conversion Program by ERDA's Division of Solar Energy. The Program's activities are planned to develop and to promote the use of photovoltaic systems to such an extent that the private sector will produce and utilize cost-competitive photovoltaic systems. As part of the ERDA Program, the Low-Cost Silicon Solar Array Project (LCSSAP) was established in January 1975. The project objective is to develop the national capability to produce low-cost, long-life photovoltaic arrays at a rate greater than 500 megawatts per year and a price of less than $500 per kilowatt peak by 1986. The array performance objectives include an efficiency greater than 10% and an operating lifetime in excess of 20 years. The approach is to reduce the cost of solar cell arrays by improving solar array manufacturing technology and by increasing solar array production capacity and quantity. Forty-three contracts have been awarded to date, to industrial firms and university and independent laboratories for experimental work, process development and analysis, technology assessment, and the production of solar-array modules. Approximately 42 kW of state-of-the-art modules have been delivered; contracts have been issued and design development has begun for 130 kW of moderately advanced modules. Efforts of the LCSSA Project are organized into an Analysis and Integration Task, four Technology Development Tasks--covering the areas of Silicon Material, Large Area Silicon Sheet, Encapsulation, and Automated Array Assembly--and a Large Scale Procurement Task, an Engineering Task, and an Operations Task. Research findings are discussed, and project planning is outlined.

Not Available

1976-01-01T23:59:59.000Z

260

Low-Cost Silicon Solar Array Project quarterly report-2, July 1976--September 1976  

SciTech Connect

The potential for future widespread use of photovoltaic systems for the generation of electric power was the motivation for the establishment, in January 1975, of the Photovoltaic Conversion Program by ERDA's Division of Solar Energy. The Program's activities are planned to develop and to promote the use of photovoltaic systems to such an extent that the private sector will produce and utilize cost-competitive photovoltaic systems. As part of the ERDA Program, the Low-Cost Silicon Solar Array Project (LCSSAP) was established in January 1975. The project objective is to develop the national capability to produce low-cost, long-life photovoltaic arrays at a rate greater than 500 megawatts per year and a price of less than $500 per kilowatt peak by 1986. The array performance objectives include an efficiency greater than 10% and an operating lifetime in excess of 20 years. The approach is to reduce the cost of solar cell arrays by improving solar array manufacturing technology and by increasing solar array production capacity and quantity. Forty-three contracts have been awarded to date, to industrial firms and university and independent laboratories for experimental work, process development and analysis, technology assessment, and the production of solar-array modules. Approximately 42 kW of state-of-the-art modules have been delivered; contracts have been issued and design development has begun for 130 kW of moderately advanced modules. Efforts of the LCSSA Project are organized into an Analysis and Integration Task, four Technology Development Tasks--covering the areas of Silicon Material, Large Area Silicon Sheet, Encapsulation, and Automated Array Assembly--and a Large Scale Procurement Task, an Engineering Task, and an Operations Task. Research findings are discussed, and project planning is outlined.

1976-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993  

DOE Green Energy (OSTI)

Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

Lienau, P.

1993-06-01T23:59:59.000Z

262

Meals, quarters for 8,200 needed at peak in LNG project  

SciTech Connect

It has everything a real town has except women, children, schools, bars, and old people. It is the huge camp built at Ras Laffan, Qatar, on the shores of the Persian Gulf to lodge and feed over 5,000 workers as they build the first plant in the emirate for liquefying millions of tons of natural gas yearly. Japan`s Chiyoda Corp. is the top contractor for the Qatar Liquefied Gas Co. (QatarGas) project, which is owned by a Qatari, French, American, and Japanese consortium. As part of the plant construction contract, Chiyoda built the camp, which Teyseer Services Co., the Qatar affiliate of the French company, Sodexho Alliance, now runs and maintains. Sodexho is the world`s largest catering/remote site management organization. It has had all its expertise in those fields put to the test for nearly 4 years supporting this world-scale LNG project which will be completed this summer. This project is described.

Aalund, L.R.

1998-04-27T23:59:59.000Z

263

NY/NJ distributed wind power field verification project. Quarterly report for the period November - December 1999  

DOE Green Energy (OSTI)

This report details the Significant Accomplishments for this quarter. The accomplishments are: (1) began preparations for host site installations; and (2) data acquisition system installation at the National Wind Technology Center (NWTC) near Boulder, CO.

Putnam, Robert Jr.

2000-01-01T23:59:59.000Z

264

Low-Cost Silicon Solar Array Project. Quarterly report 3, October 1976--December 1976  

SciTech Connect

The potential for future widespread use of photovoltaic systems for the generation of electric power was the motivation for the establishment, in January 1975, of the Photovoltaic Conversion Program by ERDA's Division of Solar Energy. The Program's activities are planned to develop and to promote the use of photovoltaic systems to such an extent that the private sector will produce and utilize cost-competitive photovoltaic systems. As part of the ERDA Program, the Low-Cost Silicon Solar Array Project (LSSA) was established in January 1975. The activities and progress of the LSSA Project during the months of October, November, and December 1976 are described. The Project objective is to develop the national capability to produce low-cost, long-life photovoltaic arrays at a rate greater than 500 megawatts per year and a price of less than $500 per kilowatt peak by 1986. The array performance goals include an efficiency greater than 10% and an operating lifetime in excess of 20 years. The approach is to reduce the cost of solar cell arrays by improving solar array manufacturing technology and by increasing solar array production capacity and quantity. Forty-seven contracts have been awarded to date, to industrial firms and university and independent laboratories for experimental work, process development and analysis, technology assessment, and the production of solar-array modules. Approximately 58 kW of state-of-the-art modules have been delivered; design development is under way for a second block of moderately advanced modules, and planning for subsequent module procurements has begun.

1976-01-01T23:59:59.000Z

265

Low-Cost Silicon Solar Array Project. Quarterly report 3, October 1976--December 1976  

DOE Green Energy (OSTI)

The potential for future widespread use of photovoltaic systems for the generation of electric power was the motivation for the establishment, in January 1975, of the Photovoltaic Conversion Program by ERDA's Division of Solar Energy. The Program's activities are planned to develop and to promote the use of photovoltaic systems to such an extent that the private sector will produce and utilize cost-competitive photovoltaic systems. As part of the ERDA Program, the Low-Cost Silicon Solar Array Project (LSSA) was established in January 1975. The activities and progress of the LSSA Project during the months of October, November, and December 1976 are described. The Project objective is to develop the national capability to produce low-cost, long-life photovoltaic arrays at a rate greater than 500 megawatts per year and a price of less than $500 per kilowatt peak by 1986. The array performance goals include an efficiency greater than 10% and an operating lifetime in excess of 20 years. The approach is to reduce the cost of solar cell arrays by improving solar array manufacturing technology and by increasing solar array production capacity and quantity. Forty-seven contracts have been awarded to date, to industrial firms and university and independent laboratories for experimental work, process development and analysis, technology assessment, and the production of solar-array modules. Approximately 58 kW of state-of-the-art modules have been delivered; design development is under way for a second block of moderately advanced modules, and planning for subsequent module procurements has begun.

Not Available

1976-01-01T23:59:59.000Z

266

MATERIALS TESTING REACTOR PROJECT. QUARTERLY REPORT FOR PERIOD ENDING MARCH 1, 1950  

SciTech Connect

Progress is reported in finaiizing basic design data for the Materials Testing Reactor. The major emphasis at ANL was on issurance of design reports on practically all phases of the MTR project outside the reactor face and low the first fioor level. Operation of the mock-up reacr at ORNL at 10 watts resulted in no major design changes. Topics discussed include the reactor building, wing, and reactor service building; canal and canal facilities; water systems; air exhaust systems; electrical power systems; effluent control; and shielding requirements. 11 drawings. (C.H.)

Huffman, J.R.

1958-10-31T23:59:59.000Z

267

Low-Cost Silicon Solar Array project (LSSA). Quarterly report, April 1976--June 1976  

DOE Green Energy (OSTI)

Activities and progress of the LSSA Project during April, May, and June 1976 are described. This involved the awarding of additional contracts, an evaluation and clarification of plans and working relationships with contractors, the receipt of initial technical results, and an expansion of activity in the evaluation and improvement of the solar cell modules that are included in the Project's first procurement (46 kilowatts). For the most part, the new manufacturing technology is being developed under contract by industries and universities. It includes the consideration of new silicon-refinement processes, silicon sheet-growth techniques, encapsulants, and automated-assembly production. During this report period analytical and experimental accomplishments resulted from day-to-day activities that are the early efforts of a long range plan. Thirty-one contracts have been awarded and two more are being negotiated. Five companies have delivered 20 kilowatts out of a total purchase of 46 kilowatts of ''off-the-shelf'' modules that will be used in ERDA's test and demonstration activities. The same five companies have just been awarded contracts for the purchase of 130 kilowatts of semistandardized modules at an average selling price of $15.50 per watt. (WDM)

Not Available

1976-10-08T23:59:59.000Z

268

Coal Air Turbine ``CAT`` program invention 604. Eighth quarter project report and final for the project, August--September 1996  

SciTech Connect

The primary objective of this ``CAT`` project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the ``CAT`` system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a ``CAT`` plant are proven, and the integration of the components into a complete plant is the only new developmental activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a ``commercial plant`` before the viability of a new concept is accepted. To satisfy this requirement the construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate for a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept.

Foster-Pegg, R.W.

1996-09-30T23:59:59.000Z

269

Renewable Energy Project Financing: Impacts of the Financial Crisis and Federal Legislation  

SciTech Connect

Extraordinary financial market conditions have disrupted the flows of equity and debt investment into U.S. renewable energy (RE) projects since the fourth quarter of 2008. The pace and structure of renewable energy project finance has been reshaped by a combination of forces, including the financial crisis, global economic recession, and major changes in federal legislation affecting renewable energy finance. This report explores the impacts of these key market events on renewable energy project financing and development.

Schwabe, P.; Cory, K.; Newcomb, J.

2009-07-01T23:59:59.000Z

270

Tampa Electric Company IGCC Project. Quarterly report, April 1 - June 30, 1996  

SciTech Connect

Tampa Electric Company continued efforts to complete construction and start-up of the Polk Power Station, Unit {number_sign}1 which will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. From an overall standpoint, the Project continues to track well. The completion of construction system turnovers to Start-up is encouraging. Start-up will accept responsibility of the plant until turnover to operations. The major focus continues to be on the production of first Syngas, scheduled for July 17. All construction, engineering, and start-up activities are in support of Syngas production. Key activities toward this goal include final checkout and startup of remaining gasification systems, completion of punch list items required for first syngas, finalization of operating procedures, preparation of site and area access control plans, site- wide safety training, and other Process Safety management (PSM) requirements.

1996-12-31T23:59:59.000Z

271

Solar-MEC development program. Project 9103 quarterly progress report, September 1--November 30, 1977  

DOE Green Energy (OSTI)

Arrangements for desiccant wheel performance tests, initial work on the computer model of dynamic behavior of the desiccant wheel, and the laboratory program are discussed. Formal arrangements are underway for a subcontract to Cargocaire Engineering Corp. to measure the drying performance of the Solar-MEC molecular sieve desiccant wheel. After negotiations for more detailed testing, it was decided that tests of the type originally proposed to the Solar Heating and Cooling Research Branch of DOE would be most suitable. Evaluation of an earlier computer model of the desiccant wheel, developed by AB Carl Munters, Sweden, indicated that it will be most effective to modify that program for use in this project, rather than use one that had been developed earlier at IGT. Both programs are based on essentially the same physical model of the drying and regeneration processes. The equipment needed for characterizing air-leak rates and identifying leakage paths has been designed and assembled. Tests will start soon.

Staats, W.R.; Wurm, J.

1977-12-01T23:59:59.000Z

272

Plutonium Residue Recovery (PuRR) project: Quarterly progress report, April-June 1988  

Science Conference Proceedings (OSTI)

A major activity during this period was the conduct of a technical review of the PuRR process before a panel of persons having expertise in residue recovery. The results of the review were favorable as to the assessment of the feasibility of the project, and the reviewers also made valuable suggestions regarding the direction of specific activities in its support. In the area of process development, several variations on initial reduction processes have been conceived and are being explored. Laboratory-scale demonstration-of-feasibility experiments continue at ANL, with further investigation of reductions from ash and from LECO crucibles. ANL is also investigating reduction over a Cu--Mg alloy, and the effects of Si and Al on the solubility of Pu in this alloy, which is proposed as the donor alloy for a subsequent salt-transport step. Some preliminary work on chlorination as a head-end step, either to form volatile chlorides of Al and Si, or selectively to chlorinate Pu, was also initiated. At LLNL, progress was made toward reactivating the Bldg. 332 (Plutonium Facility) laboratory for experiments, and with writing and issuing procedures and emergency procedures for the gloveboxes and gas purification system. In the area of engineering support for laboratory feasibility demonstrations, a Preliminary Design Review for the initial laboratory-scale hardware was held, and several tasks necessary for reactivating the gloveboxes were completed. Preliminary material balances, as recommended by the technical reviewers, have been prepared as part of the project's process engineering effort. 2 refs., 4 figs.

Pittenger, L.C.; Alire, R.M.; Coops, M.S.; Landrum, J.H.; Priest, R.E.; Thompson, D.S.; Gregg, D.W.; Burris, L.; Pierce, R.D.; Morrissey, L.J.

1988-10-24T23:59:59.000Z

273

MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990  

DOE Green Energy (OSTI)

The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number_sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

Not Available

1992-01-01T23:59:59.000Z

274

Toms Creek integrated gasification combined cycle demonstration project. Quarterly report, July 1--September 30, 1993  

SciTech Connect

The use of an upgraded version of General Electric`s Frame 6 gas turbine, which has been designated as Frame 6 (FA) will make a significant improvement to the thermal efficiency and overall economics of the Toms Creek Project. Replacing the smaller, less efficient Frame 6 (B) gas turbine with the new Frame 6 (FA) will increase the net power production from a nominal 55 MW to 105 MW. The coal feed rate will correspondingly increase from 430 tpd to 740 tpd. All process flows and equipment sizes will be increased accordingly. Selected process parameters for the original and revised Toms Creek IGCC plant configurations are compared in Table 2. There is an approximately 10% increase in net plant efficiency for the revised configuration. Using this increased plant size, the pressure vessels become larger due to an increased through-put, but are still dimensioned for shop fabrication and over-the-road shipment. The preliminary cost estimate for the enlarged demonstration plant was prepared by factoring the estimates for the original plant. Revised quotes for the larger equipment will be solicited and used to generate more accurate cost information for the revised plant.

Feher, G.

1993-11-30T23:59:59.000Z

275

Low cost solar array project. Quarterly progress report, January-March 1980  

DOE Green Energy (OSTI)

The overall objective of the LSA Silicon Material Task is to establish a chemical process for producing silicon at a rate and rice commensurate with the production goals of the LSA project for solar-cell modules. As part of -- overall Silicon Material Task, Union Carbide developed the silane-silicon process and advanced the technology to the point where it has a definite potential for providing high-purity polysilicon on a commercial scale at a price of $14/kg by 1986 (1980 dollars). This work, completed under Phases I and II of the contract, provided a firm base for the Phase III program (initiated in April 1979) aimed at establishing the practicality of the process by pursuing the following specific objectives: (1) design, fabricate, install, and operate an Experimental Process System Development Unit (EPSDU) sized for 100 MT/Yr to obtain extensive performance data to establish the data base for the design of commercial facilities; (2) perform support research and development to provide an information base usable for the EPSDU and for technological design and economic analysis for potential scale-up of the process; and (3) perform iterative economic analyses of the estimated product cost for the production of semiconductor-grade silicon in a facility capably of producing 1000 MT/Yr. Progress is repoted in detail. (WHK)

Not Available

1980-01-01T23:59:59.000Z

276

Minnesota Agri Power Project. Quarterly report, July 1, 1997--September 30, 1997  

DOE Green Energy (OSTI)

Program status and accomplishments for a project to develop alfalfa as a biomass fuel for power generation are summarized in this report. The main areas of reporting include: (1) alfalfa separation pilot plant testing, (2) design of gasification plant, (3) alfalfa leaf meal feeding trials and analysis, (4) integrated plant design and cost estimate, and (5) site plan construction and environmental permits. The alfalfa separation pilot plant fractionation equipment encountered operating problems from rocks and other tramp materials in the alfalfa bales. An investigation of techniques and equipment to remove the tramp materials resulted in the selection of a vibrating conveyor system. The Carbona gasification plant design basis and the Westinghouse scope of supply and design basis for the hot gas filter are provided in the report. The alfalfa leaf meal feeding trials showed that this economically critical co-product can be a viable livestock feed ingredient if favorable price, availability, and quality are maintained. The Stone and Webster basis of design for the integrated plant is included, and the basis for development of gas turbine performance runs is also detailed.

NONE

1997-10-01T23:59:59.000Z

277

Solar Photovoltaic Project: materials, processes, and testing activities. Quarterly report, April 1-June 30, 1979  

DOE Green Energy (OSTI)

The US Department of Energy has set a 20-year lifetime goal for terrestrial photovoltaic modules. In its capacity as a Photovoltaic Field Tests and Applications Center, Massachusetts Institute of Technology Lincoln Laboratory has established various experimental test sites, ranging in size from 0.1- to 25-kW-peak power, throughout the United States. These sites include modules from several manufacturers and serve as test beds for photovoltaic system components. This report, the fifth in a series of similar reports (1-4), summarizes the activities of the Materials, Processes and Testing Laboratory of the Solar Photovoltaic Field Tests and Applications Project during the three-month period (4/1/79 to 6/30/79). During this period, inspection trips were made to test sites at the University of Texas at Arlington and at Mead, Nebraska. Modules were tested in the field to determine the extent of physical and electrical degradation which had taken place since previous inspections. Several modules were removed from these sites for more detailed laboratory analysis. In addition, degradation analysis of modules from the rooftop of the Chicago Museum of Science and Industry, and failure analysis of modules from the Lincoln Laboratory Rooftop Test Bed and Residential Test Beds was performed. The results of both field testing and the laboratory analyses are reported.

Forman, S.E.; Themelis, M.P.

1979-10-31T23:59:59.000Z

278

Solar Photovoltaic Project: materials, processes, and testing activities. Quarterly report, 1 January-31 March 1979  

DOE Green Energy (OSTI)

The Department of Energy has set a 20-year-lifetime goal for terrestrial photovoltaic modules. Massachusetts Institute of Technology's Lincoln Laboratory, in its capacity as a Photovoltaic Field Tests and Applications Center, has established throughout the United States various experimental test sites which range in size from 0.1 to 25 kW of peak power. These sites include modules from several manufacturers and serve as test beds for photovoltaic system components. The activities of the Materials, Processes, and Testing Laboratory of the Solar Photovoltaic Project during a three-month (1/1/79-3/31/79) period are summarized. During this period, an inspection trip was made to the Mead, Nebraska, test site. The modules were tested in the field to determine the extent of physical and electrical degradation which had taken place since previous inspections. In addition, several modules were removed from the site for more detailed laboratory examination. The results of both the field testing and laboratory analyses are reported.

Forman, S.E.; Themelis, M.P.

1979-06-30T23:59:59.000Z

279

Low-Cost Solar-Array Project. Quarterly progress report, April-June 1980  

DOE Green Energy (OSTI)

The overall objective of the LSA Silicon Material Task is to establish a chemical process for producing silicon at a rate and price commensurate with the production goals of the LSA project for solar-cell modules. As part of the overall Silicon Material Task, Union Carbide developed the silane-silicon process and advanced the technology to the point where it has a definite potential for providing high-purity polysilicon on a commercial scale at a price of $14/kg by 1986 (1980 dollars). This work, completed under Phases I and II of the contract, provided a firm base for the Phase III Program (initiated in April 1979) aimed at establishing the practicality of the process by pursuing the following specific objectives: (1) design, fabricate, install, and operate an Experimental Process System Development Unit (EPSDU) sized for 100 MT/yr to obtain extensive performance data to establish the data base for the design of commercial facilities; (2) perform support research and development to provide an information base usable for the EPSDU and for technological design and economic analysis for potential scale-up of the process; and (3) perform iterative economic analyses of the estimated product cost for the production of semiconductor-grade silicon in a facility capable of producing 1000 MT/yr. This process for preparing semiconductor-grade silicon in the EPSDU from metallurgical-grade (M-G) silicon is based on a well-integrated arrangement of purification steps that provides a cost-effective process system. The three basic steps entail converting M-G silicon to trichlorosilane, redistributing the trichlorosilane to produce silane, and thermally decomposing the silane to form amorphous silicon powder. The powder is then melted and the molten silicon is cast to polycrystalline for subsequent use in fabricating solar cells. Progress is reported in detail. (WHK)

Not Available

1980-01-01T23:59:59.000Z

280

Quarterly coal report, January--March 1994  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1994 and aggregated quarterly historical data for 1986 through the fourth quarter of 1993. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

Not Available

1994-08-24T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

SmartGrid: Quarterly Data Summaries from the Data Hub and SmartGrid Project Information (from OpenEI and SmartGrid.gov)  

DOE Data Explorer (OSTI)

Both OpenEI and SmartGrid.gov are DOE portals to a wealth of information about the federal initiatives that support the development of the technologies, policies and projects transforming the electric power industry. Projects funded through the U.S. Recovery Act are organized by type and pinned to an interactive map at http://en.openei.org/wiki/Gateway:Smart_Grid. Each project title links to more detailed information. The Quarterly Data Summaries from the Data Hub at SmartGrid.gov are also available on OpenEI at http://en.openei.org/datasets/node/928. In addition, the SmartGrid Information Center contains documents and reports that can be searched or browsed. Smart Grid Resources introduces international SmartGrid programs and sites, while OpenEI encourages users to add SmartGrid information to the repository.

282

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993  

SciTech Connect

Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

Not Available

1994-03-01T23:59:59.000Z

283

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 70, quarter ending March 31, 1992  

Science Conference Proceedings (OSTI)

Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology. A list of available publication is also provided.

Not Available

1993-03-01T23:59:59.000Z

284

Environmental Compliance Performance Scorecard - Third Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Third Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

285

Environmental Compliance Performance Scorecard - Third Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Third Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011

286

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2012

287

Environmental Compliance Performance Scorecard - Third Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Third Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

288

Environmental Compliance Performance Scorecard - Second Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Second Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009

289

Automotive stirling engine development program. Quarterly technical progress report, April 1978--June 1978  

DOE Green Energy (OSTI)

The report covers the third quarter (April--June, 1978) effort of the Ford/DOE Automotive Stirling Engine Development Program, specifically Task I of that effort which is Fuel Economy Assessment. At the end of the previous quarter (March 31, 1978) the total fourth generation fuel economy projection was 23.7 mpg with a confidence level of 40%. At the end of this quarter (June 30, 1978) the total fourth generation fuel economy projection was 26.12 mpg with a confidence level of 44%. This represents an improvement of 66.4% over the baseline M-H fuel economy of 15.7 mpg. The confidence level for the original 20.6 mpg goal has been increased from 53 to 57%. Engine 3X17 has now accumulated a total of 213 h of variable speed running. A summary of the individual sub-tasks of Task I is presented. The sub-tasks are grouped into two categories: Category 1 consists of those sub-tasks which are directly related to fuel economy and Category 2 consists of those sub-tasks which are not directly related to fuel economy but are an integral part of the Task I effort.

Not Available

1978-01-01T23:59:59.000Z

290

Full scale field demonstration of unheated anaerobic contact stabilization. Quarterly project status report, July 1980-September 1980  

DOE Green Energy (OSTI)

Progress is reported on digester operation for the quarter ending September 1980. Gas production data is included. At present, the experimental digester (not heat added) is operating at an SRT of about 17 days and a temperature of 78/sup 0/F and is performing about the same as the control units operating at an SRT of 10 days and a temperature of 94/sup 0/T. (DMC)

Sykes, R.M.

1980-11-01T23:59:59.000Z

291

Strategic Petroleum Reserve: Annual/quarterly report  

SciTech Connect

Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

1994-02-16T23:59:59.000Z

292

Strategic petroleum reserve. Quarterly report  

SciTech Connect

The Strategic Petroleum Reserve serves as one of our most important investments in reducing the Nation`s vulnerability to oil supply disruptions. Its existence provides an effective response mechanism should a disruption occur and a formidable deterrent to the use of oil as a political instrument. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975, (Public Law 94-163) as amended, to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the first quarter of calendar year 1994, including: (1) inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; (2) fill rate for the current quarter and projected fill rate for the next calendar quarter; (3) average price of the petroleum products acquired during the calendar quarter; (4) current and projected storage capacity; (5) analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; (6) funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and (7) major environmental actions completed, in progress, or anticipated.

1994-05-15T23:59:59.000Z

293

International partnerships in renewable energy: Promoting climate challenge partnerships by small U.S. utilities. Fourth project report, October 1997--March 1998  

DOE Green Energy (OSTI)

In 1997, the National Rural Electric Cooperative Association (NRECA) received a grant from the Department of Energy (DOE) to implement a program to promote the participation of NRECA members in the President`s Climate Challenge Action Plan. NRECA had been in discussions with Salt River Project (SRP) and the Arizona Electric Power Cooperative (AEPCO) to pursue the opportunity of supporting a small solar energy rural electrification project in Sonora prior to the signature of this agreement. When the Climate Challenge project was approved, an agreement between NRECA, SRP, and AEPCO was reached to implement the Sonora project with funding from DOE, SRP, and AEPCO. This periodic report will summarize the results of the Sonora solar electrification project. While other Climate Challenge activities were also underway during this reporting period, due to the impact of this project it was decided to provide an in-depth report of this single project. Information directly relevant to the actions taken on this project is provided in Annexes 1 and 2. The goals of the Sonora Solar Electrification project were the following: (1) demonstrate the willingness and ability of US electric utilities to undertake a climate challenge project using renewable energy technologies; (2) select one or more communities distant from the electric grid with sufficient interest and resources to accept and sustain rural electric service using solar photovoltaic energy; (3) organize a payment system that would provide for the long-term technical and institutional viability of the project; (4) train users to operate the solar home systems safely and within proper operating parameters; (5) train local technicians to maintain the solar home systems; (6) procure and install high quality equipment at affordable costs; and (7) ascertain market conditions for expansion of program in the future.

NONE

1999-02-01T23:59:59.000Z

294

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994  

Science Conference Proceedings (OSTI)

This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

NONE

1995-05-01T23:59:59.000Z

295

CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT  

DOE Green Energy (OSTI)

The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completed and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.

Ted Berglund; Jeffrey T. Ranney; Carol L. Babb; Jacqueline G. Broder

2001-04-01T23:59:59.000Z

296

Research and development for the declassification productivity initiative. Quarterly report No. 3, July 1996--September 1996  

SciTech Connect

The third quarter began with a full-day workshop on declassification by Mr. Scott R. Lowery referred by the Technical Officer, Tom Curtis. This workshop, at Southern University, Baton Rouge, was attended by all the principal investigators. Various degrees of program have been observed for this period in all sub-areas of the DPI project. An initial evaluation of TIPSTER has revealed that its relevance to declassification would depend on a set of questions identified for further investigation. Progress is reported in developing a segment of a representation language that could be sued to enable classifiers to classify and enter information and ask questions. A prototype test suite with approximately 145 pages is being finalized to be forwarded to UNLV for testing and analysis. The progress on the computer programs developed f or the logical analysis approval is also reported along with a timeline of specific tasks for the fourth quarter.

1996-11-01T23:59:59.000Z

297

SDR PROJECT QUARTERLY TECHNICAL PROGRESS REPORT NO. 6 FOR THE PERIOD AUGUST 1, 1958 THROUGH OCTOBER 31, 1958  

SciTech Connect

A family of 200-Mw(e) SDR's was designed which could be operable ln 1965. They give total energy costs in the range 10 to 12 mills/kwh. The most promising of these reactors has the following characteristics: single-region design, moderate steam conditlons, natural uranium fuel, Zircaloy cladding, and stainless steel fuel tubes. A study of the applicability of SDR's to a broad range of power outputs (10 to 500 Mw(e)) was made. Although it appears reasonable to design a natural-uranium SDR with a power output down to 10 Mw(e), present studies indicate significant and wide economic interest at 40 Mw(e) and higher. Difficulties were encountered in interpreting the results of natural uranlum--D/ sub 2/0 lattice experiments in the Process Development Pile, and studies were initiated to determine the sources of difficulty and corrective measures. A code, called PALINDROME, which solves the Boltzmarm transport equation in the P/ sub 3/ approximation, was written. Work during the quarter on the Chugach 10- Mw(e) reactor was mainly concerned with completing the layout design of the more important reactor components and systems. A listing of the current design data is given, and a cross section of the reactor is shown. Two major changes were made during the quarter: (1) the substitution of steel ball-filled organiccooled neutron shield disks for the original concretefilled, water-cooled designs and (2) the reduction in size of the shutdown gas cooling systems. The preliminary safety analysis is briefly outlined. The development of maintenance techniques is discussed. Approximately 280 additional hours of operation of the SDR mockup facility were logged during the quarter. Modifications were made of the barrier test apparatus, and three successful experiments were performed on 6061 Al alloy. A liquid sodium leak detector was constructed, and also a rig for testlng fuel -- coolant tube closures. Sodium --liquid water and sodium--water vapor reactions were studied. (For preceding period see NDA-84-12.1 (L.T.W.)

1958-12-31T23:59:59.000Z

298

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995  

Science Conference Proceedings (OSTI)

Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

NONE

1996-08-01T23:59:59.000Z

299

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 47, Quarter ending June 1986  

SciTech Connect

Progress reports are presented for field projects and supporting research for the following: chemical flooding; gas displacement; thermal recovery; resource assessment; environmental technology; and microbial technology. (AT)

Not Available

1987-07-01T23:59:59.000Z

300

Fourth Graders Power Their Classroom with Solar Energy | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Graders Power Their Classroom with Solar Energy Fourth Graders Power Their Classroom with Solar Energy Fourth Graders Power Their Classroom with Solar Energy June 23, 2013 - 7:00pm Addthis Watch as the students in Aaron Sebens' fourth grade class complete a project that goes above and beyond a normal day in school. Minh Le Minh Le Program Manager, Solar Program LEARN MORE Watch Aaron's students explain how their solar panels work. Find out the Top 6 Things You Didn't Know About Solar. A group of fourth graders in Durham, North Carolina, are showing America the way to a clean energy future. After learning all about solar and other energy sources, Aaron Sebens -- a teacher at Central Park School for Children -- and his fourth grade class came up with a bold idea: make their classroom solar-powered. The video above documents the students' journey from idea to reality --

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

302

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

303

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual...

304

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

305

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

306

Lessons Learned Quarterly Report, December 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Welcome to the 29th quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Included in this issue: CEQ Chair Describes Goals, Supports NEPA Principles DOE NEPA Post-9/11: Reconciling the Need to Protect and the Need to Inform the Public Agencies Responses to Terrorist Attacks Forest Service Succeeds with NEPA Training Oak Ridge Holds NEPA Community Meeting DOE-wide NEPA Contracts Update Training Opportunities New on the NEPA Bookshelf Litigation Update EAs and EISs Completed This Quarter Recent EIS-Related Milestones Fourth Quarter FY 2001 Questionnaire Results NEPA Document Cost and Time Facts

307

Lessons Learned Quarterly Report, December 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 1996 Lessons Learned Quarterly Report, December 1996 Lessons Learned Quarterly Report, December 1996 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: "NEPA Compliance Officers Meeting: Continuous Improvement" DOE Comments on CEQ Cumulative Impacts Handbook DOE-wide NEPA Procurement Environmental Justice Guidance Update Senate Subcommittee Focuses on NEPA DOE NEPA Rule Amendments for Power Marketing Activities Litigation Updates: Rulings on Alternatives Environmental Assessment Quality Study Fourth quarter FY1996 Lessons Learned Questionnaire results, including EIS and EA cost and time reports Analysis of EA and EIS cost and time outliers EA and EIS cost and time trend analysis Lessons Learned Quarterly Report

308

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current storage capacity and ullage available; current status of the Strategic Petroleum Reserve storage facilities, major projects and the acquisition of petroleum products; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1995-11-15T23:59:59.000Z

309

NEPA Lessions Learned Quarterly Report - 4th Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DECEMBER 1998 DECEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1998 December 1, 1998, Issue No. 17 New and Improved NEPA Compliance Guide Issued in 2 Volumes A new and improved DOE NEPA Compliance Guide, issued by the Office of Environment, Safety and Health, has been distributed to about 750 members of the DOE NEPA Community. Intended to foster sound and efficient NEPA compliance, the Compliance Guide is a collection of resources and references to aid in NEPA document preparation and other aspects of the NEPA process. Volume I, General NEPA References, contains the statute, and regulations and guidance from the Council on Environmental Quality, the Department of State, and the

310

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1999 December 1999 1 continued on page 3 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1999 December 1, 1999; Issue No. 21 Good Information, Good Government Using Technology to Improve NEPA Decisionmaking provides a comprehensive guide to Federal environmental information resources available electronically and to useful Web sites provided by nongovernmental groups and professional organizations. “One of the foundations of good government is good information,” President Clinton observed. NEPA is “at its core, a mandate for informed, democratic decisionmaking. And its contribution to environmental protection is incalculable.” Managing a National Public Participation

311

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 44, quarter ending September 30, 1985  

SciTech Connect

Progress reports are presented for: field projects and supporting research for chemical flooding and gas displacement; supporting research for thermal methods; microbial technology; research assessment technology; and environmental technology.

Not Available

1986-09-01T23:59:59.000Z

312

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 48, Quarter ending September 30, 1986  

SciTech Connect

Progress reports are presented for: (1) chemical flooding (field projects and supporting research); (2) gas displacement (supporting research); (3) thermal methods (supporting research); (4) resource assessment technology; (5) environmental technology; and (5) microbial technology.

Not Available

1987-09-01T23:59:59.000Z

313

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 51 quarter ending June 30, 1987  

Science Conference Proceedings (OSTI)

This Progress review on enhanced oil recovery covers: Chemical Flooding /emdash/ Field Projects; Chemical Flooding /emdash/ Supporting Research; Gas Displacement /emdash/ Supporting Research; Thermal Recovery /emdash/ Supporting Research; Resource Assessment Technology; Geoscience; Environmental Technology; Microbial Technology.

Not Available

1988-05-01T23:59:59.000Z

314

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 54, quarter ending March 31, 1988  

SciTech Connect

Research programs of DOE in enhanced recovery are briefly described. A publications list from the Bartlesville Project Office and an index of the companies and institutions performing the research are included in the report. (C.B.S.)

Not Available

1989-03-01T23:59:59.000Z

315

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 43, quarter ending June 30, 1985  

Science Conference Proceedings (OSTI)

Progress reports are presented for field projects and supporting research for the following: (1) chemical flooding; gas displacement thermal recovery/heavy oil; resource assessment technology; extraction technology;environmental technology; and microbial technology. (AT)

Not Available

1986-05-01T23:59:59.000Z

316

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996  

SciTech Connect

Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

NONE

1997-05-01T23:59:59.000Z

317

Thin film gallium arsenide solar cell research. Third quarterly project report, September 1, 1980-November 30, 1980. [Antireflection coating  

DOE Green Energy (OSTI)

The major objective of this contract is to produce gallium arsenide solar cells of 10% conversion efficiency in films of less than 10 micrometers thick which have been deposited by chemical vapor deposition on graphite or tungsten coated graphite substrates. Major efforts during this quarter were directed to: (1) the optimization of the deposition of gallium arsenide films of 10 ..mu..m thickness or less on tungsten/graphic substrates, (2) the investigation of the effectiveness of various grain boundary passivation techniques, (3) the deposition of tantalum pentoxide by ion beam sputtering as an antireflection coating, (4) the deposition of gallium aluminium arsenide by the organometallic process, and (5) the fabrication and characterization of large area Schottky barrier type solar cells from gallium arsenide films of about 10 ..mu..m thickness. Various grain boundary passivation techniques, such as the anodic oxidation, thermal oxidation, and ruthenium treatment, have been investigated. The combination of thermal oxidation and ruthenium treatment has been used to fabricate Schottky barrier type solar cells. Large area MOS solar cells of 9 cm/sup 2/ area with AMl efficiency of 8.5% have been fabricated from ruthenium treated gallium arsenide films of 10 ..mu..m thickness. The construction of the apparatus for the deposition of gallium aluminum arsenide by the organometallic process has been completed. The deposition of good quality tantalum pentoxide film as an antireflection coating has been carried out by the ion beam sputtering technique. The short-circuit current density and AMl efficiency of the solar cells are increased by approximately 60%, with a slight increase in the open-circuit voltage. Details are presented. (WHK)

Chu, S. S.

1980-12-01T23:59:59.000Z

318

Natural gas imports and exports. Fourth quarter report  

Science Conference Proceedings (OSTI)

This report summarizes the data provided by companies authorized to import or export natural gas. Data includes volume and price for long term and short term, and gas exported to Canada and Mexico on a short term or spot market basis.

NONE

1995-12-31T23:59:59.000Z

319

EIA directory of electronic products. Fourth quarter 1995  

SciTech Connect

The Energy Information Administration (EIA) makes available for public use a series of machine-readable data files and computer models. The data files and models are made available to the public on magnetic tapes. In addition, selected data files/models are available on diskette for IBM-compatible personal computers.

NONE

1996-08-01T23:59:59.000Z

320

EIA directory of electronic products fourth quarter 1993  

SciTech Connect

The Energy Information Administration (EIA) makes available for public use a series of machine-readable data files and computer models. The data files and models are made available to the public on magnetic tapes. In addition, selected data files/models are available on diskette for IBM-compatible personal computers. For each product listed in this directory, a detailed abstract is provided which describes the data published.

1994-02-23T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Environmental Compliance Performance Scorecard Fourth Quarter FY2010  

Energy.gov (U.S. Department of Energy (DOE))

The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecards timeliness and completeness, the dynamic...

322

ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2012  

DOE Green Energy (OSTI)

This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the fourth quarter of 2012.

Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.; Ramsden, T.

2013-05-01T23:59:59.000Z

323

Stationary Fuel Cell System Composite Data Products: Data Through Quarter 4 of 2012  

DOE Green Energy (OSTI)

This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes stationary fuel cell system composite data products for data through the fourth quarter of 2012.

Ainscough, C.; Kurtz, J.; Saur, G.

2013-05-01T23:59:59.000Z

324

Green River formation water flood demonstration project, Unita Basin, Utah. Quarterly technical progress report, January 1, 1995--March 31, 1995  

SciTech Connect

The objective of this project was to understand the successful water flood in the Monument Butte unit and apply it to other units and other reservoirs. Expanding the Monument Butte Water Flood was also one of the objectives. This report provides progress in the areas of field drilling and production results and modeling the boundary unit.

Lomax, J.D.; Nielson, D.L.; Deo, M.D.

1995-06-01T23:59:59.000Z

325

Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994  

Science Conference Proceedings (OSTI)

This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

Not Available

1994-08-01T23:59:59.000Z

326

Energy Research Information System. Volume 1, Number 4. cumulative indexes (project nos. 00000001 through 00000539). Quarterly report  

SciTech Connect

This cumulative index includes a state location index, an organization index and a subject keyword index incorporating the indexes from Energy Research Information System (ERIS), Volume 1, Numbers 1, 2, and 3. This issue, plus the first three ERIS reports, comprise a set of 539 research project references for the states of the Old West Region -- Montana, Nebraska, North Dakota, South Dakota and Wyoming.

Givens, B.M.; Boyd, C.A.

1976-08-01T23:59:59.000Z

327

Strategic Petroleum Reserve. Quarterly report  

SciTech Connect

The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated. Samples of the oil revealed two problems that, although readily correctable, have reduced the availability of some of the oil inventory for drawdown in the near-term. These problems are: (1) a higher-than-normal gas content in some of the crude oil, apparently from years of intrusion of methane form the surrounding salt formation; and (2) elevated temperatures of some of the crude oil, due to geothermal heating, that has increased the vapor pressure of the oil. Investigations are proceeding to determine the extent to which gas intrusion and geothermal heating are impacting the availability of oil for drawdown. Preliminary designs have been developed for systems to mitigate both problems.

1993-11-15T23:59:59.000Z

328

High SO{sub 2} removal efficiency testing. Quarterly status report, October 1994--December 1994  

SciTech Connect

This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO{sub 2} Removal Testing{close_quotes}, for the time period 1 October through 31 December 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low-capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades to be evaluated primAllily involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation (NYSEG) Kintigh Station (Option V). By the beginning of the fourth quarter of 1994, testing had been completed for the base project and for all options. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1995. Section 5 contains a brief acknowledgement.

Blythe, G.

1995-02-03T23:59:59.000Z

329

Kick-Off Meeting for New Fuel Cell Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Assistance Reporting Checklist andor the Project Management and Reporting Task of the SOPO * Quarterly Technical Progress Report - due 30 days after the end of the quarter *...

330

Coal air turbine {open_quotes}CAT{close_quotes} program, Invention 604. Third quarter project report, April 1995--June 1995  

DOE Green Energy (OSTI)

The primary objective of this {open_quotes}CAT{close_quotes} project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the {open_quotes}CAT{close_quotes} system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a {open_quotes}CAT{close_quotes} plant are proven, and the integration of the components into a complete plant is the only new development activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a {open_quotes}commercial plant{close_quotes} before the viability of a new concept is accepted. To satisfy this requirement and construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept.

Foster-Pegg, R.W.

1995-07-31T23:59:59.000Z

331

Heat transfer at the mold-metal interface in permanent mold casting of aluminum alloys project. Quarterly project status report, April 1--June 30, 1998  

Science Conference Proceedings (OSTI)

Extensive progress in development of an HTC (heat transfer coefficient) Evaluator and in the preparation of the experiments at CMI and Amcast have been achieved in the last three months. The interface of the HTC Evaluator has been developed in Visual C++ for the PC platform. It provides a tool to collect and store the published data on heat transfer coefficients in a database for further analysis. It also supports the mathematical model for evaluation of heat transfer coefficients. More than 100 papers related to this project have been cited and most of them have been collected. The preparation of the experiments at CMI is almost completed. A hockey-puck mold has been selected for the experiments for squeeze casting and semi-solid casting. A direct cavity pressure measurement system was purchased from Kistler. The pressure probes and data acquisition software as well as the necessary accessories have been delivered. The instrumented mold modification has been designed and the modifications completed. At Amcast Automotive, a new wheel-like mold for low-pressure permanent mold casting was designed. The CAD file for mold fabrication has been generated. The modeling of the casting has been done. An extensive survey on the ultrasonic gap formation measurement was fulfilled. It is concluded that the ultrasonic probe is capable of measuring a gap under the authors` casting conditions. In the last three months, four project meetings has been organized and held with the industrial partners.

Pehlke, R.D.; Hao, S.W.

1998-06-30T23:59:59.000Z

332

SPEAR 3 Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

through December through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management Control System (PMCS) area is now headed by Steve McNiel who replaces Teri Knight. Teri has helped set-up the PMCS operation and reporting system over the last year and we deeply appreciate her efforts. Both Steve and Teri have the experience of utilizing the Primavera/Cobra system for tracking and

333

LFCM vitrification technology: Quarterly progress report, July-September 1987  

SciTech Connect

This report describes the progress in developing, testing, applying and documenting liquid-fed ceramic melter vitrification technology. Progress in the following technical subject areas during the fourth quarter of FY 1987 is discussed: melting process chemistry and glass development, feed preparation and transfer systems, canister filling and handling systems, and process/product modeling and control.

Brouns, R.A.; Allen, C.R.; Powell, J.A. (comps.); Bates, S.O.; Bray, L.A.; Budden, M.J.; Dierks, R.D.; Elliott, M.L.; Elmore, M.R.; Faletti, D.W.; Farnsworth, R.K.; Holton, L.K. Jr.; Kuhn, W.L.; Mellinger, G.B.; Nakaoka, R.K.; Peterson, M.E.; Piepel, G.F.; Powell, J.A.; Pulsipher, B.A.; Reimus, M.A.H.; Surma, J.E.; Wiemers, K.D.

1988-09-01T23:59:59.000Z

334

Power Technologies Energy Data Book: Fourth Edition  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Energy Data Book August 2006 * NRELTP-620-39728 Fourth Edition Power Technologies Energy Data Book Fourth Edition Compiled by J. Aabakken Prepared under Task No....

335

Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992  

Science Conference Proceedings (OSTI)

Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

Not Available

1993-09-01T23:59:59.000Z

336

Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992  

Science Conference Proceedings (OSTI)

Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

Not Available

1993-12-01T23:59:59.000Z

337

Quarterly Construction Status Report Period Ending: June 30, 2012  

E-Print Network (OSTI)

of each project together with progress photographs and the project manager's estimate of the cost to complete the project. Because the reports contain projected costs and also account for budget risks #12;Quarterly Construction Status Report Period Ending: June 30, 2012 Project Number Project Index

Holsinger, Kent

338

ARM Climate Research Facility Quarterly Instrument Report Fourth Quarter: October 1December 30, 2010  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

Voyles, JW

2011-01-17T23:59:59.000Z

339

Fourth Annual Conference  

NLE Websites -- All DOE Office Websites (Extended Search)

Southeast Southeast Regional Carbon Sequestration Partnership www.secarbon.org Hilton Alexandria Mark Center May 5, 2005 Presented by: Gerald R. Hill, Ph.D. Senior Technical Advisor Southern States Energy Board SECARB Project Partners SECARB Technology Coalition Source: Massachusetts Institute of Technology All Sources www.secarbon.org Source: Applied Resources International Geological Provinces of the SE Regional Partnership www.secarbon.org P i e d m o n t B l u e R i d g e C o a s t a l P l a i n O f f - s h o r e S e d i m e n t a r y w e d g e A p p a l a c h i a n P l a t e a u Poor prospects High-risk/site specific detail needed Good potential for prospects Preliminary Prospects for Geologic Storage www.secarbon.org Source: Massachusetts Institute of Technology Coal Formation Prospects in Southeast Region www.secarbon.org CBM Field Nora CBM Field Oakwood Welch CBM Field Bradshaw CBM Field S e m i - A n t h r a c i t e CBM

340

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

FFA Quarterly Report: April 1-June 30, 2009 FFA Quarterly Report: April 1-June 30, 2009 July 2009 Doc. No. S05572 Page 1 Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: April 1-June 30, 2009 This report summarizes project status and activities implemented April through June 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) sites. This report also includes disposal cell and Pond 4 leachate collection data, quarterly site inspection reports, site meteorological data, and a performance summary for the ex situ groundwater treatment system. 1.0 MMTS Activities/Status 1.1 Disposal Cell and Pond 4 * Monthly and quarterly inspections of the repository identified livestock damage to a

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1999 September 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 1999 September 1, 1999; Issue No. 20 Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis By: Ellen Russell, NEPA Document Manager, Fossil Energy with Carolyn Osborne, Office of NEPA Policy and Assistance continued on page 3 Fossil Energy (FE) is preparing an environmental impact statement (EIS) for what would be the first cross-border high-voltage transmission project to connect the main power delivery systems of the United States and Mexico (DOE/EIS-0307). EIS scoping has been complex. Through the scoping process, FE has identified and worked with many stakeholders to define a broad range

342

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994  

SciTech Connect

This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

NONE

1995-11-01T23:59:59.000Z

343

Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon July 14, 2011 - 11:57am Addthis Team Massachusetts' Project Manager Spencer Culhane puts the finishing touches on the team's design model. | Courtesy of the Team Massachusetts Flickr photostream Team Massachusetts' Project Manager Spencer Culhane puts the finishing touches on the team's design model. | Courtesy of the Team Massachusetts Flickr photostream Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy In honor of the U.S. Department of Energy Solar Decathlon -- which challenges 20 collegiate teams to design, build, and operate solar-powered houses that are cost-effective, energy-efficient, and attractive -- we are

344

Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon July 14, 2011 - 11:57am Addthis Team Massachusetts' Project Manager Spencer Culhane puts the finishing touches on the team's design model. | Courtesy of the Team Massachusetts Flickr photostream Team Massachusetts' Project Manager Spencer Culhane puts the finishing touches on the team's design model. | Courtesy of the Team Massachusetts Flickr photostream Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy In honor of the U.S. Department of Energy Solar Decathlon -- which challenges 20 collegiate teams to design, build, and operate solar-powered houses that are cost-effective, energy-efficient, and attractive -- we are

345

Contracts for field projects and supporting research on enhanced oil recovery. Quarterly technical progress report, October 1994--December 1994. Progress review No. 81  

SciTech Connect

This document consists of a publications list for field projects and brief descriptions of research projects on enhanced petroleum recovery.

1996-03-01T23:59:59.000Z

346

Mild coal pretreatment to improve liquefaction reactivity. Quarterly technical progress report, June--August 1991  

SciTech Connect

This report describes work completed during the fourth quarter of a three year project to study the effects of mild chemical pretreatment on coal dissolution reactivity during low severity liquefaction or coal/oil coprocessing. The overall objective of this research is to elucidate changes in the chemical and physical structure of coal by pretreating with methanol or other simple organic solvent and a trace amount of hydrochloric acid and measure the influence of these changes on coal dissolution reactivity. This work is part of a larger effort to develop a new coal liquefaction or coal/oil coprocessing scheme consisting of three main process steps: (1) mile pretreatment of the feed coal to enhance dissolution reactivity and dry the coal, (2) low severity thermal dissolution of the pretreated coal to obtain a very reactive coal-derived residual material amenable to upgrading, and (3) catalytic upgrading of the residual products to distillate liquids.

Miller, R.L.

1991-12-31T23:59:59.000Z

347

Strategic petroleum reserve. Quarterly report  

SciTech Connect

The Strategic Petroleum Reserve reduces the Nation`s vulnerability to oil supply disruptions. Its existence provides a formidable deterrent to the use of oil as a political instrument and an effective response mechanism should a disruption occur. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current and projected storage capacity, analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1995-08-15T23:59:59.000Z

348

Sandia Vertical-Axis Wind Turbine Program. Technical quarterly report, July--September 1976. [USA  

DOE Green Energy (OSTI)

This quarterly report describes the activities of the Sandia Laboratories' Vertical-Axis Wind Turbine (VAWT) project during the period July to September 1976, transitional quarter of fiscal year 1976. Included are the highlights of the quarter; review of the status of general design efforts in the areas of aerodynamics, structures, and testing.

Grover, R.D.; Veneruso, A.F. (eds.)

1977-06-01T23:59:59.000Z

349

Dip-coating process. Silicon sheet growth development for the large-area silicon sheet task of the low-cost silicon solar array project. Quarterly report No. 7  

DOE Green Energy (OSTI)

The objective of this research program is to investigate the technical and economic feasibility of producing solar-cell-quality sheet silicon by coating one surface of carbonized ceramic substrates with a thin layer of large-grain polycrystalline silicon from the melt. During the past quarter, significant progress was demonstrated in several areas. Seeded growth of silicon-on-ceramic (SOC) with an EFG ribbon seed was demonstrated. Different types of mullite received from Coors were successfully coated with silicon. A new method of deriving minority carrier diffusion length, L/sub n/, from spectral response measurements was evaluated. ECOMOD cost projections were found to be in good agreement with the interim SAMIS method proposed by JPL. On the less positive side, there was a decrease in cell performance which is believed to be due to an unidentified source of impurities. Also, operation of the new coating system fell behind schedule but is expected to improve in the coming quarter, since construction has now been completed.

Zook, J.D.; Heaps, J.D.; Maciolek, R.B.; Koepke, B.; Butter, C.D.; Schuldt, S.B.

1977-12-30T23:59:59.000Z

350

Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Success Stories: Success Stories: Articles from Department of Energy NEPA Lessons Learned Quarterly Reports 1996 Mar Hanford Tanks Public participation in NEPA process resulted in changes to the scope of the proposed project. The NEPA process resulted in enforceable mitigation commitments. 1997 Dec NPR Sale The NEPA process resulted in enforceable mitigation commitments for biological and cultural resources. 1999 Mar SPR Pipeline Integrating NEPA and the Section 404 permit processes proved efficient and resulted in mitigation commitments. 1999 Jun LANL Habitat Plan The NEPA process resulted in a site-wide habitat management plan (reducing future need for biological assessments), geographic information system (reference for future project analyses), and endangered species protection.

351

Searches for Fourth Generation Fermions  

SciTech Connect

We present the results from searches for fourth generation fermions performed using data samples collected by the CDF II and D0 Detectors at the Fermilab Tevatron p{bar p} collider. Many of these results represent the most stringent 95% C. L. limits on masses of new fermions to-date. A fourth chiral generation of massive fermions with the same quantum numbers as the known fermions is one of the simplest extensions of the SM with three generations. The fourth generation is predicted in a number of theories, and although historically have been considered disfavored, stands in agreement with electroweak precision data. To avoid Z {yields} {nu}{bar {nu}} constraint from LEP I a fourth generation neutrino {nu}{sub 4} must be heavy: m({nu}{sub 4}) > m{sub Z}/2, where m{sub Z} is the mass of Z boson, and to avoid LEP II bounds a fourth generation charged lepton {ell}{sub 4} must have m({ell}{sub 4}) > 101 GeV/c{sup 2}. At the same time due to sizeable radiative corrections masses of fourth generation fermions cannot be much higher the current lower bounds and masses of new heavy quarks t' and b' should be in the range of a few hundred GeV/c{sup 2}. In the four-generation model the present bounds on the Higgs are relaxed: the Higgs mass could be as large as 1 TeV/c{sup 2}. Furthermore, the CP violation is significantly enhanced to the magnitude that might account for the baryon asymmetry in the Universe. Additional chiral fermion families can also be accommodated in supersymmetric two-Higgs-doublet extensions of the SM with equivalent effect on the precision fit to the Higgs mass. Another possibility is heavy exotic quarks with vector couplings to the W boson Contributions to radiative corrections from such quarks with mass M decouple as 1/M{sup 2} and easily evade all experimental constraints. At the Tevatron p{bar p} collider 4-th generation chiral or vector-like quarks can be either produced strongly in pairs or singly via electroweak production, where the latter can be enhanced for vector-like quarks. In the following we present searches for both pair and single production of heavy quarks performed by CDF and D0 Collaborations.

Ivanov, A.; /Fermilab

2011-09-01T23:59:59.000Z

352

NEPA Lessons Learned Quarterly Report December 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 2000 December 1, 2000; Issue No. 25 DOE NEPA Order Revised, National Nuclear Security Administration Responsibilities Outlined On October 26, 2000, the Deputy Secretary of Energy issued DOE O 451.1B, National Environmental Policy Act Compliance Program, to accommodate National Nuclear Security Administration (NNSA) NEPA responsibilities. The revised Order has an expanded section on applicability and a new section on NNSA procedures. With respect to an EIS for an NNSA activity, the NNSA Administrator will fulfill the responsibilities of a Secretarial Officer (including consulting with the NNSA General Counsel), and the Secretary or Deputy

353

Lessons Learned Quarterly Report, March 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2013 March 2013 Lessons Learned Quarterly Report, March 2013 In this issue, we highlight the many benefits of NEPA to DOE, including improved planning, and better public involvement and environmental protection. Articles in this issue include: Sharing DOE's NEPA Success Stories Integrating NEPA and Project Planning Works Minimize EIS Printing Costs DOE Cooperating Agency Report Electronic Guidance Compendium Tribal Energy Resource CEQ IT Working Group Conferences DOE-wide NEPA Contracts Update Transitions EAs and EISs Completed This Quarter Questionnaire Results Cost and Time Facts LLQR-2013-Q1.pdf More Documents & Publications Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, March 2013 Lessons Learned Quarterly Report, June 2013 Lessons Learned Quarterly Report, September

354

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Capacity (short tons of ore per day) 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 EFR White Mesa LLC White Mesa Mill San Juan, Utah 2,000 Operating Operating Operating Operating-Processing Alternate Feed Energy Fuels Resources Corporation Piñon Ridge Mill Montrose, Colorado 500 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Permitted And Licensed Energy Fuels Wyoming Inc Sheep Mountain Fremont, Wyoming 725 - Undeveloped Undeveloped Undeveloped Kennecott Uranium Company/Wyoming Coal Resource Company Sweetwater Uranium Project Sweetwater, Wyoming 3,000

355

Lessons Learned Quarterly Report, September 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 1999 Lessons Learned Quarterly Report, September 1999 Lessons Learned Quarterly Report, September 1999 Welcome to the 20th Quarterly Report on lessons learned in the NEPA process. This issue includes a cumulative index for the past five years. Articles in this issue include: Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis CEQ Memo on Non-Federal Cooperating Agencies EPA Guidance on Cumulative Impacts DOE NEPA Web Demonstration Publishing a Draft EIS on NEPA Web NAEP Conference Forest Services Decision Protocol DOE-wide NEPA Contracts Update DOE Litigation Update Other Agency NEPA Cases EAs and EISs Completed this Quarter Other EIS-related Documents Third Quarter FY 1999 Questionnaire Results Cost and Time Facts Training Opportunities

356

Fourth Generation Light Source Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

The Workshop on Scientific Opportunities for Fourth Generation Light The Workshop on Scientific Opportunities for Fourth Generation Light Sources October 27 to 29, 1997 at the Advanced Photon Source at Argonne National Laboratory. This workshop is being co-hosted by APS, NSLS, SSRL and TJNAF. FGLSlogo This workshop will explore the phenomenology of interactions with ultra-high-power, -brilliance, and -coherence light sources in the DUV, soft x-ray, and x-ray regimes, as well as the scientific opportunities they provide. The workshop will begin with tutorials on the generation and properties of these sources and identify issues in their use in experimentation. Also included will be an overview of current efforts to develop these sources and a review of the scientific opportunities defined by previous research and workshops. These background talks will be followed

357

Solar-MEC development program. Project 9103 third quarter progress report, March 1--May 31, 1978. [Desiccant wheel and regenerative heat exchange wheel performance  

DOE Green Energy (OSTI)

During the third quarter of the Solar-MEC program, work continued on developing the computer model simulating the desiccant wheel behavior (Task 1) and assessing the performance of the regenerative heat exchange wheel (Task 3). This report specifically presents the results obtained using the computer model as an analytical tool to evaluate design and operating conditions to optimize the wheel's performance. It also contains evaluations of two different available heat transfer matrixes: the currently used aluminum honeycomb and a new product, a potentially less-expensive, corrugated aluminum material. The mathematical modeling and diagnostic evaluations and ways of improving the component and machine performance were identified and are described for both tasks.

Wurm, J.; Weil, S.A.; Zawacki, T.S.; Kinast, J.A.; Macriss, R.A.

1978-12-01T23:59:59.000Z

358

Silicon Materials Task of the Low Cost Solar Array Project (part 2). Second quarterly report, 1 January 1976--31 March 1976  

DOE Green Energy (OSTI)

The objective of this program, Part 2 of the Silicon Materials Task, is to develop and define purity requirements for solar cell grade silicon material by evaluating the effects of metal impurities and impurity concentration on the performance of terrestrial silicon solar cells. During this quarter the growth of all first generation doubly-doped Czochralski ingots was completed (baseline boron + Cr, Mn, Cu, Ni, Fe, Ti, V, Mg, Zn, Al, and Zr), as were 90 percent of the second generation ingots, several third generation ingots, and three multiply-doped (B + Cu/Mn, Cu/Cr, Mn/Cr) ingots. (WDM)

Hopkins, R.H.; Davis, J.R.; Rai-Choudhury, P.; Blais, P.D.

1976-01-01T23:59:59.000Z

359

Search for the fourth standard model family  

Science Conference Proceedings (OSTI)

Existence of the fourth family follows from the basics of the standard model (SM) and the actual mass spectrum of the third family fermions. We discuss possible manifestations of the fourth SM family at existing and future colliders. The LHC and Tevatron potentials to discover the fourth SM family have been compared. The scenario with dominance of the anomalous decay modes of the fourth-family quarks has been considered in detail.

Sahin, M.; Sultansoy, S.; Turkoz, S. [TOBB University of Economics and Technology, Physics Division, Ankara (Turkey); TOBB University of Economics and Technology, Physics Division, Ankara (Turkey) and Institute of Physics, National Academy of Sciences, Baku (Azerbaijan); Ankara University, Department of Physics, Ankara (Turkey)

2011-03-01T23:59:59.000Z

360

NAWIG News: The Quarterly Newsletter of the Native American Wind Interest Group, Summer 2007  

Science Conference Proceedings (OSTI)

DOE's Wind Powering America program has initiated a quarterly NAWIG newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events.

Not Available

2007-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 18  

DOE Green Energy (OSTI)

This eighteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of March 2007, and covers activities in the eighteenth project quarter, January 2007 March 2007.

Tim Richter

2007-03-31T23:59:59.000Z

362

Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 13  

DOE Green Energy (OSTI)

This thirteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of December 2005, and covers activities in the thirteenth project quarter, October 2005 ? December 2005.

Tim Richter

2006-03-23T23:59:59.000Z

363

Quarterly Coal Distribution Report 1st Quarter 2012  

U.S. Energy Information Administration (EIA)

1st Quarter 2012 June 2012 Quarterly Coal Distribution Report www.eia.gov U.S. Department of Energy Washington, DC 20585

364

Quarterly Coal Distribution Report 3rd Quarter 2011  

U.S. Energy Information Administration (EIA)

3rd Quarter 2011 January 2012 Quarterly Coal Distribution Report www.eia.gov U.S. Department of Energy Washington, DC 20585

365

Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA)

October 2012 Independent Statistics & Analysis www.eia.gov . U.S. Department of Energy Washington, DC 20585 . Quarterly Coal Distribution Report 2nd Quarter 2012

366

Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994  

SciTech Connect

Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

Abdelghani, A.

1994-06-01T23:59:59.000Z

367

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 37, quarter ending December 31, 1983  

SciTech Connect

Project reports are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; thermal methods; resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; and general supporting research.

Linville, B. (ed.)

1984-08-01T23:59:59.000Z

368

Gallium arsenide thin films on tungsten/graphite substrates. Phase II. Quarterly project report No. 2, December 1, 1977-February 28, 1978  

DOE Green Energy (OSTI)

The objectives of this contract are to investigate thin films of gallium arsenide on tungsten/graphite substrates and to prepare solar cells with an AM1 efficiency of 6% or higher by August 1978. Efforts during this quarter have been directed to: (1) the deposition and characterization of gallium arsenide films on tungsten/graphite substrates by the arsenic and arsine processes, (2) the construction and operation of an apparatus for the deposition of titanium dioxide films, and (3) the fabrication and evaluation of MOS solar cells on tungsten/graphite substrates. Gallium arsenide films have been deposited on tungsten/graphite substrates by the reaction of gallium, hydrogen chloride, and arsenic in a hydrogen flow. The structural and electrical properties of these films are very similar to those obtained by the arsine process. The initial stage of the deposition of gallium arsenide films on tungsten/graphite substrates has been investigated by the scanning electron microscopy.

Chu, S.S.

1978-03-01T23:59:59.000Z

369

Quarterly Coal Report  

Annual Energy Outlook 2012 (EIA)

December 2010 DOEEIA-0121 (201003Q) Revised: July 2012 Quarterly Coal Report July - September 2010 December 2010 U.S. Energy Information Administration Office of Oil, Gas, and...

370

AAI Quarterly Meeting Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI Quarterly Meeting Minutes August 1, 2007 AAI Updates - Rod Gerig USPAS Schools * USPAS 2008 Winter School - University of California, Santa Cruz January 14-25, 2008 * USPAS...

371

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

1991-08-15T23:59:59.000Z

372

Federal Technical Capability Program - Quarterly Performance Indicator  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Performance Indicator Reports Quarterly Performance Indicator Reports 2013 Quarterly Report on Federal Technical Capability August 16, 2013 Quarterly Report on Federal Technical Capability June 5, 2013 Quarterly Report on Federal Technical Capability February 20, 2013 2012 Quarterly Report on Federal Technical Capability November 20, 2012 Quarterly Report on Federal Technical Capability August 8, 2012 Quarterly Report on Federal Technical Capability May 30, 2012 Quarterly Report on Federal Technical Capability March 6, 2012 2011 Quarterly Report on Federal Technical Capability November 10, 2011 Quarterly Report on Federal Technical Capability August 24, 2011 Quarterly Report on Federal Technical Capability May 18, 2011 Quarterly Report on Federal Technical Capability February 23, 2011

373

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1997 December 1997 1 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED For Fourth Quarter FY 1997 December 1, 1997, Issue No. 13 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT continued on page 2 I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£W W W W Whyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r The endangered San Joaquin Kit Fox would continue to be protected after sale of NPR-1. (Photo courtesy of

374

Advanced research and technology development fossil energy materials program. Quarterly progress report for the period ending September 30, 1981  

DOE Green Energy (OSTI)

This is the fourth combined quarterly progress report for those projects that are part of the Advanced Research and Technology Development Fossil Energy Materials Program. The objective is to conduct a program of research and development on materials for fossil energy applications with a focus on the longer-term and generic needs of the various fossil fuel technologies. The program includes research aimed toward a better understanding of materials behavior in fossil energy environments and the development of new materials capable of substantial enhancement of plant operations and reliability. Work performed on the program generally falls into the Applied Research and Exploratory Development categories as defined in the DOE Technology Base Review, although basic research and engineering development are also conducted. A substantial portion of the work on the AR and TD Fossil Energy Materials Program is performed by participating cntractor organizations. All subcontractor work is monitored by Program staff members at ORNL and Argonne National Laboratory. This report is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1981 in which projects are organized according to fossil energy technologies. We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program.

Bradley, R.A. (comp.) [comp.

1981-12-01T23:59:59.000Z

375

Lessons Learned Quarterly Report, December 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1997 1997 Lessons Learned Quarterly Report, December 1997 Welcome to the fourth quarter FY 1997 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: NEPA Review Adds Value to Proposed Sale of Naval Petroleum Reserve INEEL EIS: New Approaches to Scoping CEQ Environmental Justice Guidance Strategies for EIS Savings ISO 14000 and NEPA Recent EIS Milestones NAEP NEPA Recommendations New National Environmental Training Office Beneficial Landscaping Practices Draft CEQ Guidance on Global Climate Change Transitions DOE-wide NEPA Contracts Update Transboundary Environmental Impacts Annual NEPA Planning Summaries Recent NEPA Guidance Public Involvement: If You Don't Know Where You're Going Litigation Updates Questionnaire Results EIS-related Documents

376

Energy programs. Quarterly report, January-March 1980  

DOE Green Energy (OSTI)

The Johns Hopkins University Applied Physics Laboratory, is engaged in developing energy resource, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the US Naval Air Station, Norfolk, Va.

Not Available

1980-01-01T23:59:59.000Z

377

Contracts for field projects and supporting research on enhanced oil recovery. Quarterly progress review No. 85, October 1, 1995--December 31, 1995  

SciTech Connect

This documents presents progress on enhanced oil recovery programs and reservoir characterization programs. Information is presented on contract numbers, awards, investigators, and project managers.

Godley, P.; Waisley, S.

1996-12-01T23:59:59.000Z

378

BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980  

Science Conference Proceedings (OSTI)

During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

Dougan, P.M.

1980-03-20T23:59:59.000Z

379

Lessons Learned Quarterly Report, September 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Welcome to the 28th quarterly report on lessons learned in the NEPA process. This completes our seventh year of providing performance metrics, news, and guidance to the DOE NEPA Community. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Compliance Officers Consider Further Improvements NCO Meeting Federal/State/Tribal Coordination Forest Fire; Forest Preserved View From EPA Streamlining Approvals of Energy Projects NEPA Pilot Projects to Demonstrate Mediation DOE-wide NEPA Contracting Executive Order on Migratory Birds FERC Outreach for Natural Gas Approvals Life-Cycle Assessment for "Green" Projects

380

EIA -Quarterly Coal Distribution  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Distribution Coal Distribution Home > Coal> Quarterly Coal Distribution Back Issues Quarterly Coal Distribution Archives Release Date: June 27, 2013 Next Release Date: September 2013 The Quarterly Coal Distribution Report (QCDR) provides detailed quarterly data on U.S. domestic coal distribution by coal origin, coal destination, mode of transportation and consuming sector. All data are preliminary and superseded by the final Coal Distribution - Annual Report. Year/Quarters By origin State By destination State Report Data File Report Data File 2009 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf October-December pdf xls pdf 2010 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf xls

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Analysis and evaluation of processes and equipment in Tasks II and IV of the Low-Cost Solar Array Project. Quarterly report, April-July 1978  

DOE Green Energy (OSTI)

The significant economic data for the current production multiblade wafering and inner diameter slicing processes were tabulated and compared to data on the experimental and projected Varian multiblade slurry, STC ID diamond coated blade, Yasunaga multiwire slurry and Crystal Systems fixed abrasive multiwire slicing methods. Cost calculations were performed for current production processes and for 1982 and 1986 projected wafering techniques.

Goldman, H.; Wolf, M.

1978-11-01T23:59:59.000Z

382

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995  

Science Conference Proceedings (OSTI)

This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

NONE

1996-06-01T23:59:59.000Z

383

Effects of calcium magnesium acetate on the combustion of coal-water slurries. Thirteenth Quarterly project status report, 1 September 1992--30 November 1992  

SciTech Connect

Production of CWF agglomerates of pulverized coal grind has commenced. A bituminous coal PSOC 1451 HVA coal has been obtained from the Penn State Coal Sample Bank, size classified in the 38-45{mu}m range. This coal was mixed with water (40 % solids) and with 1% ammonium lignosulfonate as a dispersant. Generation of pre-dried CWF agglomerates has been conducted in a thermal reactor, as described at an earlier report. The solenoid actuator-driven single drop generator is used fitted with different size needle-plunger combinations. During the present, 14th quarter, the following tasks are being conducted: (a) Measure the gas temperature profiles in the new furnace and recalibrate the pyrometer. (b) Generate an inventory of CWF agglomerates of different coal grinds and carbon black with and without CMA. (c) Conduct high temperature experiments to identify differences in the combustion behavior of agglomerates of different coal grinds, and (d) efforts will be conducted to capture the resulting ash particles for visual observations.

Levendis, Y.A.

1992-12-31T23:59:59.000Z

384

Silicon materials task of the low cost solar array project (Phase III): effect of impurities and processing on silicon solar cells. Fourteenth quarterly report, January-March 1979  

DOE Green Energy (OSTI)

The objective of this program is to determine how various processes, impurities, and impurity-process interactions affect the properties of silicon and the performance of terrestrial solar cells made from silicon. The data provide a basis for cost-benefit analysis to the producers and users of Solar Grade Silicon. The Phase III effort encompasses five major topics: (1) examination of the interaction of impurities with processing treatments, (2) generation of a data base and modeling of impurity effects in n-base solar cells, (3) extension of previous p-base studies to include impurities likely to be introduced during silicon production, refining or crystal growth, (4) a consideration of the potential impact of anisotropic (nonuniform) impurity distribution in large Czochralski and ribbon solar cells and, (5) a preliminary investigation of the permanence of impurity effects in silicon solar cells. During this quarter (1) the mechanisms responsible for impurity deactivation during high temperature gettering treatments was examined in detail, (2) the sead to tang and center to edge variation in Czechralski ingot properties for commercial-size ingots doped with Ti and Mn was evaluated, and (3) aging effects in solar cells doped with Ti or Mo were assessed. Also, an analysis of impurity effects on crystal structure breakdown, and the monitoring of ingot lifetimes by photoconductive decay lifetime measurement before and after processing were continued. The highlights of this work are described. (WHK)

Hopkins, R.H.; Davis, J.R.; Blais, P.D.; Rohatgi, A.; Campbell, R.B.; Rai-Choudhury, P.; Stapleton, R.E.; Mollenkopf, H.C.; McCormick, J.R.

1979-04-01T23:59:59.000Z

385

NEPA Success Stories from Lessons Learned Quarterly Reports | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports This document contains a compilation of NEPA "success stories" that were featured in DOE Lessons Learned Quarterly Reports (LLQRs). Feature articles in LLQR have described how the NEPA process provided an organized structure for making some of the Department's most complex decisions. NEPA reviews have resulted in significant project cost savings through informed decision making. Some articles have highlighted ways in which the NEPA process improved environmental outcomes, such as by identifying better alternatives or more effective mitigation. Some articles have put the spotlight on procedural success, such as effective public

386

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 21, quarter ending December 31, 1979  

Science Conference Proceedings (OSTI)

Individual report are presented of contracts for field projects and supporting research on chemical flooding, CO/sub 2/ injection, thermal/heavy oil, resource assessment technology, improved drilling technology, residual oil, environment, and petroleum technology. (DLC)

Linville, B. (ed.)

1980-04-01T23:59:59.000Z

387

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 26, quarter ending March 31, 1981  

SciTech Connect

Objectives and technical progress are summarized for field projects and supporting research in chemical flooding, CO/sub 2/ injection, thermal/heavy oil recovery, resource assessment, extraction technology, microbial enhanced oil recovery, and improved drilling technology. (DLC)

Linville, B. (ed.)

1981-07-01T23:59:59.000Z

388

Tennessee Energy Statistics Quarterly, third quarter 1984  

Science Conference Proceedings (OSTI)

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow - production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1984-01-01T23:59:59.000Z

389

Early Fuel Cell Market Deployments: ARRA; Quarter 2 of 2010; Composite Data Products, Final Version April 14, 2010  

SciTech Connect

Graphs of composite data products produced by DOE's early fuel cell market demonstration projects for the second quarter of 2010.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.

2010-06-01T23:59:59.000Z

390

Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 11, DOE/AL68080-TSR11  

DOE Green Energy (OSTI)

This eleventh quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2005, and covers activities in the eleventh project quarter, April 2005-June 2005.

Tim Richter

2005-09-26T23:59:59.000Z

391

Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 19, DOE/AL68080-TSR19  

DOE Green Energy (OSTI)

This nineteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2007, and covers activities in the nineteenth project quarter, April 2007 June 2007.

Tim Richter

2007-06-30T23:59:59.000Z

392

Quarterly Coal Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Report Quarterly Coal Report Release Date: October 02, 2013 | Next Release Date: December 2013 | full report Previous Quarterly Coal Data historical data (PDF): 1st quarter 2013 4th quarter 2012 3rd quarter 2012 2nd quarter 2012 1st quarter 2012 4th quarter 2011 3rd quarter 2011 2nd quarter 2011 1st quarter 2011 prior to 2011 Go The Quarterly Coal Report (QCR) provides detailed quarterly data on U.S. coal production, exports, imports, receipts, prices, consumption, quality, stocks, and refined coal. Data on U.S. coke production, consumption, stocks, imports, and exports are also provided. All data for 2011 and prior years are final. All data for 2012 and 2013 are preliminary. Highlights for second quarter 2013: U.S. coal production during second quarter 2013 totaled 243.1

393

Back Issues of the Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

coal > Quarterly Coal Report > Quarterly Coal Report Back Issues Quarterly Coal Report Back Issues of the Quarterly Coal Report Year 4thquarter 3rdquarter 2ndquarter 1stquarter QCR...

394

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

March 2011 DOEEIA-0121 (201004Q) Revised: July 2012 Quarterly Coal Report October - December 2010 March 2011 U.S. Energy Information Administration Office of Oil, Gas, and Coal...

395

Federal Assistance Program Quarterly Project Progress Report. Geothermal Energy Program: Information Dissemination, Public Outreach, and Technical Analysis Activities. Reporting Period: January 1 - March 31, 2001 [Final report  

SciTech Connect

The final report of the accomplishments of the geothermal energy program: information dissemination, public outreach and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association and the Washington State University Energy Program.

Lund, John W.

2002-03-22T23:59:59.000Z

396

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 33, quarter ending December 31, 1982  

SciTech Connect

Progress reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, resource assessment technology, extraction technology, environmental and safety, microbial enhanced oil recovery, oil recovery by gravity mining, improved drilling technology, and general supporting research.

Linville, B. (ed.)

1983-04-01T23:59:59.000Z

397

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress Review No. 31, quarter ending June 30, 1982  

Science Conference Proceedings (OSTI)

Progress reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, resource assessment technology, extraction technology, environmental, petroleum technology, microbial enhanced oil recovery, oil recovery by gravity mining, improved drilling technology, and general supporting research.

Linville, B. (ed.)

1982-10-01T23:59:59.000Z

398

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 27, for quarter ending June 30, 1981  

Science Conference Proceedings (OSTI)

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, as well as for the following areas of research: resource assessment technology; extraction technology; environmental; microbial enhanced oil recovery; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1981-09-01T23:59:59.000Z

399

Progress review No. 24: contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress report, quarter ending September 30, 1980  

Science Conference Proceedings (OSTI)

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection and thermal/heavy oil, as well as for the following areas of research: extraction technology; resource assessment technology; environmental; petroleum technology; microbial enhanced oil recovery; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1981-02-01T23:59:59.000Z

400

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 32, quarter ending September 30, 1982  

SciTech Connect

Progress reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, resource assessment technology, extraction technology, environmental and safety, microbial enhanced oil recovery, oil recovery by gravity mining, improved drilling technology, and general supporting research.

Linville, B. (ed.)

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 30, quarter ending March 31, 1982  

SciTech Connect

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, as well as for the following areas of research: resource assessment technology; extraction technology; microbial enhanced oil recovery; improved drilling technology, and general supporting research.

Linville, B. (ed.)

1982-07-01T23:59:59.000Z

402

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 35, quarter ending June 30, 1983  

Science Conference Proceedings (OSTI)

Progress reports are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; thermal/heavy oil; resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1983-10-01T23:59:59.000Z

403

Progress review No. 25: contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress report, quarter ending December 31, 1980  

Science Conference Proceedings (OSTI)

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, as well as for the following areas of research: resource assessment technology; extraction technology; environmental; microbial enhanced oil recovery; improving drilling technology; and general supporting research.

Linville, B. (ed.)

1981-05-01T23:59:59.000Z

404

Lessons Learned Quarterly Report Cumulative Index | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Requirements Lessons Learned Lessons Learned Quarterly Report Cumulative Index Lessons Learned Quarterly Report Cumulative Index Guidance Requirements Lessons...

405

CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT  

DOE Green Energy (OSTI)

The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversions of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.

Ted Berglund; Jeffrey T. Ranney; Carol L. Babb; Jacqueline G. Broder

2001-01-01T23:59:59.000Z

406

Combustion characterization of beneficiated coal-based fuels. Quarterly report No. 11, October--December 1991  

SciTech Connect

The objectives of this project include: (1) the development of an engineering data base which will provide detailed information on the properties of beneficiated coal-based fuels (BCFs) influencing combustion, ash deposition, ash erosion, particulate collection, and emissions; and (2) the application of this technical data base to predict the performance and economic impacts of firing the BCFs in various commercial boiler designs. The technical approach used to develop the technical data includes: bench-scale fuel property, combustion, and ash deposition tests; pilot-scale combustion and ash effects tests; and full-scale combustion tests. Subcontractors perform parts of the test work are the Massachusetts Institute of Technology Physical Science, Inc. Technology Company and the University of North Dakota Energy and Environmental Research Center. Twenty fuels will be characterized during the three-year base program: three feed coals, fifteen BCFs, and two conventionally cleaned coals for full-scale tests. Approximately nine BCFs will be in dry ultra fine coal (DUC) form, and six BCFs will be in coal-water fuel (CWF) form. Additional BCFs would be characterized during optional project supplements. During the third quarter of 1991, the following technical progress was made: Continued analyses of drop tube furnace samples to determine devolatilization kinetics; completed analyses of the samples from the pilot-scale ash deposition tests of three Freeport Pittsburgh 8 fuels; conducted pilot-scale combustion and ash deposition tests of a fresh batch of Upper Freeport parent coal in the CE fireside Performance Test Facility; and completed editing of the fourth quarterly report and sent it to the publishing office.

Chow, O.K.; Nsakala, N.Y.

1992-03-01T23:59:59.000Z

407

QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY...  

Gasoline and Diesel Fuel Update (EIA)

the historical data may not precisely match that published in the MER. SPR: Strategic Petroleum Reserve Notes: Minor discrepancies with other published EIA historical...

408

SOP Quarterly Report FY-94 3rd Quarter  

NLE Websites -- All DOE Office Websites (Extended Search)

Hybrid Vehicle Program Site Operator Program Quarterly Progress Report for April thru June 1994 (3rd Quarter of FY-1994) INEL-940072-Qtr 3 Formerly: EGG-EP-11237-Qtr 3 D. M. Kiser...

409

EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter  

SciTech Connect

The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

Showalter, Mary Ann

2008-09-16T23:59:59.000Z

410

Tennessee Energy Statistics Quarterly. Second quarter 1984  

SciTech Connect

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity. The Tennessee Energy Statistics Quarterly has been developed by the Tennessee Energy Data Base Program to serve as a supplement to the Energy Division publication - The Tennessee Energy Profiles: 1960-1980. Historical data reported in this volume cover the production and utilization of major energy supplies by fuel type and economic sectors, as well as other energy data such as prices and fuel distribution. 12 figures, 12 tables.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1985-01-01T23:59:59.000Z

411

EMSL Quarterly Highlights Report: 4th Quarter, FY08  

SciTech Connect

This report outlines the science highlights, publications, and other happenings at EMSL in 4th quarter of FY08.

Showalter, Mary Ann

2008-11-24T23:59:59.000Z

412

EMSL Quarterly Highlights Report: FY09, 3rd Quarter  

Science Conference Proceedings (OSTI)

This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

2009-07-17T23:59:59.000Z

413

Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1993-10-01T23:59:59.000Z

414

Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

NONE

1995-10-01T23:59:59.000Z

415

Quarterly progress report on the DOE Waste Package project at the University of Nevada, Las Vegas, July 1, 1993 through September 30, 1993  

Science Conference Proceedings (OSTI)

Progress reports are presented for the following tasks: overview and progress of waste package project and container design; waste container design considerations (criticality analysis, experimental drift model); waste container alternate design considerations; thermal simulation of high level nuclear waste canister emplacement; structural analysis and design of nuclear waste package canister; robotic manipulation of the nuclear waste container; investigation of stress in a circular tunnel due to overburden & thermal loading of horizontally placed 21PWR multi-purpose canisters; investigation of faulted tunnel models by combined photoelasticity and finite element analysis; and transport phenomena in the near field.

Ladkany, S.G.

1993-11-01T23:59:59.000Z

416

Conceptual design assessment for the co-firing of bio-refinery supplied lignin project. Quarterly report, June 23--July 1, 2000  

DOE Green Energy (OSTI)

The Conceptual Design Assessment for the Co-Firing of Bio-Refinery Supplied Lignin Project was successfully kicked off on July 23, 2000 during a meeting at the TVA-PPI facility in Muscle Shoals, AL. An initial timeline for the study was distributed, issues of concern were identified and a priority actions list was developed. Next steps include meeting with NETL to discuss de-watering and lignin fuel testing, the development of the mass balance model and ethanol facility design criteria, providing TVA-Colbert with preliminary lignin fuel analysis and the procurement of representative feed materials for the pilot and bench scale testing of the hydrolysis process.

Berglund, T.; Ranney, J.T.; Babb, C.L.

2000-07-27T23:59:59.000Z

417

Phase II - photovoltaics for utility scale applications (PVUSA). Quarterly technical report, First quarter 1996  

SciTech Connect

This is the first of three planned quarterly Technical Reports of 1996 system performance and major project activities. The final quarter will be discussed in the 1996 Progress Report. Activity for the PVUSA project was curtailed considerably, pending resolution of the transfer of management to the California Energy Commission (CEC) and the Sacramento Municipal Utility District (SMUD). Principal activities during the first quarter of 1996 included: (1) Continued negotiations regarding the transfer of project management from PG&E to the joint CEC/SMUD team. Primary remaining hurdle is obtaining approval from the California Public Utilities Commission. (2) Provided training to CEC and SMUD project team members on January 8, 9, and 11. Training covered site operations including data acquisition. (3) Completed the draft of the 1995 Progress Report. (4) Supported the contractor in their efforts for enhancing the performance and reliability of the Amonix EMT-3 array at Davis. (5) Reviewed the PSCo installation drawings, and started activities to provide the PVUSA DAS equipment, (6) Operation and maintenance of existing systems, including data collection and reporting. Data were collected for 19 completed systems with a combined capacity of 1,800 kW. Combined, these systems generated nearly 1.1 million kWh during January through March. The project`s cumulative generation now stands at 8.2 million kWh. Key cumulative 1996 results are listed in the following table. The locations of systems other than Davis are noted alongside the supplier`s name.

NONE

1996-07-01T23:59:59.000Z

418

Ion-plating of solar cell arrays encapsulation task, LSA Project 32. First quarterly progress report, December 1979-March Jun 1980  

DOE Green Energy (OSTI)

Ion-plating is a vacuum metallizing process where the depositant is evaporated from a source (tungsten filament, electron beam gun, etc.) into a high frequency electric field where the material is ionized and then accelerated by a DC field toward the substrate. This process combines the high deposition rates associated with physical vapor deposition and improved adhesion without entrapment of Ar gas (as in sputtering). The ITW contract was initiated in December 1979 to investigate, develop, and demonstrate the capability to produce operational solar cells having metallizations and AR coatings deposited by gasless ion-plating, which will separately and/or in combination with a low cost encapsulation system meet the LSA project life, cost and performance goals. Under this contract ITW will also investigate the ability to deposit by gasless ion-plating AR and anti-soiling coatings on glass; said coatings to be permanent and possess 20 year durability. Progress is reported.

Conley, W. R.

1980-01-01T23:59:59.000Z

419

Fourth National Report for the Joint Convention on the Safety...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth National Report for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Fourth National Report for the Joint...

420

Microsoft Word - Apr-June 2012 Monticello Quarterly_S09178_FFA -final.doc  

Office of Legacy Management (LM)

2 2 June 2012 Doc. No. S09178 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement Quarterly Report: April 1-June 30, 2012 1.0 Introduction This report summarizes the status of the Monticello Vicinity Properties (MVP) and the Monticello Mill Tailings Site (MMTS), located in and near Monticello, Utah, for the period of April through June 2012. The report also includes a summary of projected near-term activity and reporting requirements. Quarterly reports are submitted to the U.S. Environmental Protection Agency (EPA) and the Utah Department of Environmental Quality (UDEQ) to apprise project managers of project status and near-term schedule of activities and reporting requirements. The MMTS and MVP were placed on the EPA National Priorities List (NPL) in 1989 and 1986,

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 Cameco Crow Butte Operation Dawes, Nebraska 1,000,000 Operating Operating Operating Operating Hydro Resources, Inc. Church Rock McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Hydro Resources, Inc. Crownpoint McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Lost Creek ISR, LLC, a subsidiary of Ur- Energy USA Inc. Lost Creek Project Sweetwater, Wyoming 2,000,000 Under Construction Under Construction

422

Lessons Learned Quarterly Report, June 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Welcome to the 59th quarterly report on lessons learned in the NEPA process. We are pleased to feature the DOE NCO meeting and the NAEP annual conference, where streamlining the NEPA process for Recovery Act projects and consideration of climate change in NEPA documents were both addressed. We've begun to follow up on suggestions from the NCO meeting (below). Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NEPA Compliance Officers Share Strategies 2009 NCO Meeting: Expediting a Quality NEPA Process Expedite Schedule and Maintain Quality Preparing Focused, Concise EAs

423

Lessons Learned Quarterly Report, September 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Welcome to the 60th quarterly report on lessons learned in the NEPA process. We are pleased to feature the extraordinary support provided by our NCO volunteers and to introduce Scott Blake Harris, DOE General Counsel, and his plans for improving the DOE NEPA process. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NCO Volunteers Lend a Hand To Expedite Recovery Act Projects DOE General Counsel Scott Blake Harris Aims To Improve the NEPA Review Process CEQ Report to Congress on Recovery Act DOE Grants NEPA Variances for Two Solicitations Introducing DOE's New General Counsel

424

Lessons Learned Quarterly Report, September 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, September 2012 This issue features suggestions from experienced NEPA practitioners on ways to meet Secretary Chu's challenge to make better use of existing tools and integrate project management with NEPA compliance. Articles in this issue include: Secretary's Memorandum Key Principles OLC Training Suggestions from NETL Effective EIS Management Teams EPA Requires Electronic EIS Filing 2012 DOE NEPA Stakeholders Directory DOE-wide NEPA Contracts Update GIS Tools for the NEPA Practitioner CEQ Cooperating Agency Report NEPA Office Summer Interns Transitions Appeals Court Upholds BELLA EA Using Social Media for NEPA NNSA Webcast SPD SEIS Hearing EAs and EISs Completed This Quarter Questionnaire Results

425

Lessons Learned Quarterly Report, March 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Welcome to the 34th quarterly report on lessons learned in the NEPA process. We are pleased to feature the synergy between NEPA and the new DOE Order 450.1, Environmental Protection Program. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: New DOE Order Focuses on EMS, Supports Basic NEPA Principles Few Comments Received on Proposed Floodplain/Wetlands Rule Changes China's Environmental Impact Assessment Law DOI/Forest Service Proposed Categorical Exclusions Potential Resources for NEPA Practitioners A View from the Trenches Fossil Energy Launches EIS Process Improvement Team CEQ Updates EIS Distribution Saves Yucca Mountain Project $200,000

426

Lessons Learned Quarterly Report, September 1995 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1995 September 1995 Lessons Learned Quarterly Report, September 1995 This quarterly report summarizes the lessons learned for documents completed between April 1 and June 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs. The report includes a Question and Answer section as well as guidance on selected topics. REPORT CONTENTS: NEPA Document Preparation Times NEPA Cost Data NEPA Document Content The Document Preparation Process Effectiveness of the NEPA Process Other Lessons Learned Lessons Learned Questions and Answers EISs Completed 3rd Quarter FY 1995 EAs Completed 3rd Quarter FY 1995

427

EDIN-USVI Clean Energy Quarterly | Open Energy Information  

Open Energy Info (EERE)

EDIN-USVI Clean Energy Quarterly EDIN-USVI Clean Energy Quarterly Jump to: navigation, search Name EDIN-USVI Clean Energy Quarterly Agency/Company /Organization National Renewable Energy Laboratory Sector Energy, Water Focus Area Buildings, Energy Efficiency - Utility, Economic Development, Energy Efficiency, Grid Assessment and Integration, People and Policy, Transportation, Renewable Energy, Biomass, Solar, - Solar Hot Water, - Solar Pv, Biomass - Waste To Energy, Wind Phase Bring the Right People Together, Evaluate Options, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Free; publicly available Website http://www.edinenergy.org/usvi Locality U.S. Virgin Islands References EDIN-USVI Clean Energy Quarterly[1] Contents 1 Overview 2 Highlights

428

Lessons Learned Quarterly Report, June 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2005 Lessons Learned Quarterly Report, June 2005 Lessons Learned Quarterly Report, June 2005 Welcome to the 43rd quarterly report on lessons learned in the NEPA process. In this issue we take a look at our hard-working NEPA Compliance Officers, who share bits of wisdom (and a little humor) gained from their lessons learned implementing NEPA. Countless thanks to all NCOs for their dedication, flexibility, and perseverance. As always, we welcome your suggestions for continuous improvement. Articles in this issue include: Who Has More Than 500 Years of NEPA Experience? A Closer Look at the DOE NEPA Compliance Officers CEQ Asks Federal Agencies to Lead NEPA Modernization Congressional NEPA Task Force Earth Day 2005 EPA Rates Action Alternatives in Moab EIS Update on Cape Wind Project

429

Quarterly Report 09-01  

NLE Websites -- All DOE Office Websites (Extended Search)

Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Phone: 909-469-0315 Ÿ FAX: 909-469-0319 Ÿ Juan.Argueta@sce.com Demonstration and Evaluation of U.S. Postal Service Electric Carrier Route Vehicles Quarterly Report, September 2001 AQMD CONTRACT #00192 Project Number: TC-00-0101 Report Number: TC-00-0101-TR05 Electric Vehicle Technical Center An ISO 9001 Certified Facility Prepared by: Michel Wehrey Juan C. Argueta Fabian Sanchez Julie M. Phung Southern California Edison September 26, 2001 Page i DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES This report was prepared by the Electric Transportation Division of Southern California Edison, a subsidiary of Edison International. Neither the Electric Transportation Division of Southern California Edison, Southern

430

Silicon Materials Task of the Low Cost Solar Array Project (Phase II). Effect of impurities and processing on silicon solar cells. Phase II. Summary and eleventh quarterly report  

DOE Green Energy (OSTI)

The effects of various processes, metal contaminants and contaminant-process interactions on the performance of terrestrial silicon solar cells were investigated. A variety of aspects including thermal treatments, crystal growth rate, base doping concentration (low resistivity), base doping type (n vs. p), grain boundary structure, and carbon/oxygen-metal interactions (float zone vs Czochralski growth) were studied. The effects of various metallic impurities were studied, introduced singly or in combination into Czochralski, float zone and polycrystalline silicon ingots and into silicon ribbons grown by the dendritic web process. The totality of the solar cell data (comprising over 4000 cells) indicate that impurity-induced performance loss is primarily due to reduction in base diffusion length. Based on this assumption an analytical model has been developed which predicts cell performance as a function of metal impurity content. The model has now been verified for p-base material by correlating the projected and measured performance of solar cells made on 19 ingots bearing multiple impurities.

Hopkins, R.H.; Davis, J.R.; Blais, P.D.; Rohatgi, A.; Rai-Choudhury, P.; Hanes, M.H.; McCormick, J.R.

1978-07-01T23:59:59.000Z

431

Analysis and evaluation of processes and equipment in Tasks II and IV of the Low-Cost Solar Array Project. Quarterly report, October 1977-January 1978  

DOE Green Energy (OSTI)

Several experimental and projected Czochralski crystal growing process methods were studied and compared to available operations and cost-data of recent production Cz-pulling, in order to elucidate the role of the dominant cost contributing factors. From this analysis, it becomes apparent that substantial cost reductions can be realized from technical advancements which fall into four categories: an increase in furnace productivity; the reduction of crucible costs through use of the crucible for the equivalent of multiple state-of-the-art crystals; the combined effect of several smaller technical improvements; and a carry-over effect of the expected availability of semiconductor grade polysilicon at greatly reduced prices. Consequently, the specific add-on costs of the Cz-process can be expected to be reduced by about a factor of three by 1982, and about a factor of five by 1986. A format to guide in the accumulation of the data needed for thorough techno-economic analysis of solar cell production processes has been developed, called the University of Pennsylvania Process Characterization (UPPC) format, and has first been applied, as well as refined, in the Cz crystal pulling analysis. The accumulated Cz process data are presented in this format in the Appendix. The application of this UPPC format with the SAMICS cost and price determination methodology, at least in its Interim Price Estimating Guidelines (IPEG) form, has been established and is detailed.

Goldman, H.; Wolf, M.

1978-08-01T23:59:59.000Z

432

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

June 2010 DOE/EIA-0121 (2010/01Q) June 2010 DOE/EIA-0121 (2010/01Q) Revised: July 2012 Quarterly Coal Report January - March 2010 June 2010 U.S. Energy Information Administration Office of Oil, Gas, and Coal Supply Statistics U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.gov/coal/production/quarterly/ _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of

433

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Quarterly Coal Report January - March 2008 July 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

434

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2009 September 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

435

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

7/01Q) 7/01Q) Quarterly Coal Report January - March 2007 June 2007 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

436

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2008 December 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

437

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2008 September 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

438

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

8/04Q) 8/04Q) Quarterly Coal Report October - December 2008 March 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

439

THE CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT  

DOE Green Energy (OSTI)

The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. During this quarter, TVA completed the washing and dewatering of the lignin material produced from the MSW hydrolysis. Seven drums of lignin material were washed to recover the acid and sugar from the lignin and provide an improved fuel for steam generation. Samples of both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation. After sample evaluation, EERC approved sending the material and all of the necessary fuel for testing was shipped to EERC. EERC has requested and will receive coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio based fuels is scheduled to begin in August of 2001. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam. The preliminary steam price will be determined in the next quarter.

Ted Berglund; Jeffrey T. Ranney; Carol L. Babb; Jacqueline G. Broder

2001-07-01T23:59:59.000Z

440

NRC TLD Direct Radiation Monitoring Network. Volume 15, No. 4: Quarterly progress report, October--December 1995  

Science Conference Proceedings (OSTI)

This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1995. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

Struckmeyer, R.

1996-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Direct conversion of light hydrocarbon gases to liquid fuel. Quarterly technical status report No. 15 fourth quarter FY 1990  

DOE Green Energy (OSTI)

The objective of this program is to investigate the direct conversion of light gaseous hydrocarbons, such as those produced during Fischer-Tropsch synthesis or as a product of gasification, to liquid transportation fuels via a partial oxidation process. The process will be tested in an existing pilot plant to obtain credible mass balances. Specific objectives to be met include determination of optimal process conditions, investigation of various processing options (e.g. feed injection, product quench, and recycle systems), and evaluation of an enhanced yield thermal/catalytic system. Economic evaluation of the various options will be performed as experimental data become available.

Foral, M.J.

1990-12-31T23:59:59.000Z

442

ARM Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 01September 30, 2011  

SciTech Connect

The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive. New information is highlighted in blue text. New information about processed data by the developer is highlighted in red text.

Sivaraman, C

2011-11-02T23:59:59.000Z

443

ARM Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 1September 30, 2012  

SciTech Connect

The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive.

Sivaraman, C

2012-11-13T23:59:59.000Z

444

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

445

Solvent refined coal (SRC) process. Quarterly technical progress report, January 1980-March 1980. [In process streams  

DOE Green Energy (OSTI)

This report summarizes the progress of the Solvent Refined Coal (SRC) project at the SRC Pilot Plant in Fort Lewis, Wahsington, and the Process Development Unit (P-99) in Harmarville, Pennsylvania. After the remaining runs of the slurry preheater survey test program were completed January 14, the Fort Lewis Pilot Plant was shut down to inspect Slurry Preheater B and to insulate the coil for future testing at higher rates of heat flux. Radiographic inspection of the coil showed that the welds at the pressure taps and the immersion thermowells did not meet design specifications. Slurry Preheater A was used during the first 12 days of February while weld repairs and modifications to Slurry Preheater B were completed. Two attempts to complete a material balance run on Powhatan No. 6 Mine coal were attempted but neither was successful. Slurry Preheater B was in service the remainder of the quarter. The start of a series of runs at higher heat flux was delayed because of plugging in both the slurry and the hydrogen flow metering systems. Three baseline runs and three slurry runs of the high heat flux program were completed before the plant was shut down March 12 for repair of the Inert Gas Unit. Attempts to complete a fourth slurry run at high heat flux were unsuccessful because of problems with the coal feed handling and the vortex mix systems. Process Development Unit (P-99) completed three of the four runs designed to study the effect of dissolver L/D ratio. The fourth was under way at the end of the period. SRC yield correlations have been developed that include coal properties as independent variables. A preliminary ranking of coals according to their reactivity in PDU P-99 has been made. Techniques for studying coking phenomenona are now in place.

Not Available

1981-01-01T23:59:59.000Z

446

By-Products Utilization  

E-Print Network (OSTI)

modifications in the project milestone plan may be desirable. The primary task completed for the fourth quarter

Wisconsin-Milwaukee, University of

447

FOURTH OF JULY CREEK HYDROELECTRIC PROJECT Table of Contents  

E-Print Network (OSTI)

SECTION 1.- APPLICANT INFORMATION............................................................................ 2 1.1. Applicant point of contact.................................................................................................... 2 1.2. Applicant minimum requirements....................................................................................... 2

unknown authors

2008-01-01T23:59:59.000Z

448

Great Plains Gasification Project status report  

Science Conference Proceedings (OSTI)

The Great Plains Coal Gasification Project is designed to convert North Dakota lignite into pipeline quality high Btu synthetic natural gas (SNG). Located in Mercer County, North Dakota, the project consists of a coal gasification plant, coal mine, and an SNG pipeline. Construction of the project started in the summer of 1981 and was essentially complete by the fourth quarter of 1984. The plant operating staff started initial start-up planning in early 1982 and moved to the plant site in late 1982. The first unit taken over from construction was the secondary water treating unit and initial operations began on August 19, 1983. The remainder of the plant was commissioned and started up in a planned sequence with initial production of SNG occurring on July 28, 1983. Both trains were in operation and the plant was producing at about 70 percent of design capacity by December 1984-a date that has been targeted for in a start-up schedule prepared some 4-5 years earlier.

Pollock, D.C.; Stockwell, R.E.

1985-01-01T23:59:59.000Z

449

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

450

Lessons Learned Quarterly Report, June 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Lessons Learned Quarterly Report, June 2001 Welcome to the 27th quarterly report on lessons learned in the NEPA process. Articles included in this issue: DOE Issues Supplement to Yucca Mountain Draft EIS Los Alamos Project Guided by MAP BPAs Readers Guide Cultural, Tribal, and Historic Updates Secretarial Policy on Cultural Resources Working with Indian Tribal Nations Historic Preservation Final Regulations Can Pilot Projects, Dispute Resolution Techniques Improve NEPA Implementation? DOE-wide NEPA Contracts Update Mini-guidance: DOE Public Reading Rooms Drafting Federal Register Notices Potential NEPA Implications of a National Energy Policy Nominee for CEQ Transitions Training Opportunities EAs and EISs Completed This Quarter Recent EIS Milestones Cost and Time Facts

451

(California Energy Commission) quarterly oil report, first quarter 1991  

SciTech Connect

The total volume of petroleum fuels supplied in the first quarter of 1991 declined 5 percent (7.4 million barrels) from a year ago and 0.6 percent (0.9 million barrels) from the previous quarter. Unleaded gasoline volumes supplied were 2.6 percent (1.7 million barrels) higher in the first quarter than a year ago. Aviation fuel volumes supplied in the first quarter were 3.6 percent (0.8 million barrels) higher than a year ago. Distillate fuel volumes supplied in the first quarter were 5.2 percent (1.2 million barrels) lower than a year ago. Low sulfur fuel oil volumes supplied in the first quarter were 68 percent (2.9 million barrels) lower than a year ago. Electric utility use was 88 percent (2.9 million barrels) lower than a year ago. Petroleum fuel stocks were 4 percent (2.4 million barrels) higher than a year ago and 1.4 percent (0.8 million barrels) higher than the previous quarter. The average international crude oil price in the first quarter of 1991 was $18.43 per barrel, 1.1 percent higher than a year ago, but 37 percent below the previous quarter. The California Kern River average crude oil price in the first quarter of 1991 was $12.41 per barrel, 21 percent lower than a year ago and 43 percent lower than the previous quarter. Self-serve retail gasoline prices in the first quarter of 1991 were 12 to 17 percent higher than a year ago. Refiners produced an average of 2 million barrels of petroleum products per day in the first quarter of 1991, 6 percent less than a year ago and 3.5 percent less than the previous quarter. The statewide refinery utilization rate was 84.9 percent in the first quarter of 1991, down from 86.7 percent in the previous quarter and 95.2 percent from a year ago. 19 figs. 13 tabs.

1991-07-01T23:59:59.000Z

452

Quarterly Coal Distribution Report 4th Quarter 2011  

U.S. Energy Information Administration (EIA)

Coal receipts as provided in the Quarterly Coal Distribution Report for the Electricity Generation sector are less than the total quantities reported ...

453

Quarterly Coal Distribution Report 3rd Quarter 2012  

U.S. Energy Information Administration (EIA)

December 2012 Independent Statistics & Analysis www.eia.gov . U.S. Department of Energy Washington, DC 20585 . Quarterly Coal Distribution Report

454

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010  

Science Conference Proceedings (OSTI)

This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

2010-02-04T23:59:59.000Z

455

Heat exchanger: ingot casting/slicing process. Silicon sheet growth development for the large area silicon sheet task of the low cost silicon solar array project. First quarterly report, November 20, 1975--December 31, 1975  

DOE Green Energy (OSTI)

Designs for changes to the existing crystal casting furnace and multi-wafer slicer were completed prior to the contract. Equipment supplies necessary for the modifications and silicon material were ordered during the first one and one-quarter month period covered. Assembly preparation and check-out of all systems are on schedule. (auth)

Schmid, F.

1975-12-31T23:59:59.000Z

456

Office of Fossil Energy DOE Award No.: DE-NT0005668 Quarterly...  

NLE Websites -- All DOE Office Websites (Extended Search)

Table 1: Project costing profile for Budget Period 1, Quarter 4 Time period Cost share DoE Plan DoE Actual April 2010 0 8000 7684 May 2010 0 8000 7684 June 2010 0 8000...

457

Office of Fossil Energy DOE Award No.: DE-NT0005668 Quarterly...  

NLE Websites -- All DOE Office Websites (Extended Search)

Table 1: Project costing profile for Budget Period 2, Quarter 4 Time period Cost share DoE Plan DoE Actual October 2010 0 8000 7684 November 2010 0 8000 7684 December 2010...

458

Liquid fossil-fuel technology. Quarterly technical progress report, October-December 1982  

Science Conference Proceedings (OSTI)

Progress accomplished for the quarter ending December 1982 is reported for the following research areas: liquid fossil fuel cycle; extraction (technology assessment, gas research, oil research); liquid processing (characterization, thermodynamics, processing technology); utilization; and project integration and technology transfer. (ATT)

Linville, B. (ed.)

1982-01-01T23:59:59.000Z

459

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

460

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

Note: This page contains sample records for the topic "quarterly projections fourth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

462

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

1990-08-15T23:59:59.000Z

463

Imperial Valley Environmental Project: quarterly data report  

DOE Green Energy (OSTI)

This is a catalog of all samples which have been collected and the presently available results of chemical and other analyses. Types covered include: air quality, water quality, ecosystem quality, subsidence and seismicity, remotely sensed data, socioeconomic effects, and measurements of radioactivity. (MHR)

Nyholm, R.A.; Anspaugh, L.R. (comps.)

1977-04-13T23:59:59.000Z

464

FEDERAL ASSISTANCE PROGRAM QUARTERLY PROJECT PROGRESS REPORT  

NLE Websites -- All DOE Office Websites (Extended Search)

Olga Old Faithhl Geyser of CA 1299 Tubbs La Calistoga, CA 954 15 Discussed problem with heat exchanger in her heating system. 707-942-6463 070397 Re: Gfip Lizardos, Evans...

465

EMSL Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

th Quarter, Fiscal Year 2008 th Quarter, Fiscal Year 2008 (July 1, 2008, through September 30, 2008) DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or o