Light duty utility arm walkdown report  

Science Conference Proceedings (OSTI)

This document is a report of the Light Duty Utility Arm (LDUA) drawing walkdown. The purpose of this walkdown was to validate the essential configuration of the LDUA in preparation of deploying the equipment in a Hanford waste tank. The LDUA system has, over the course of its development, caused the generation of a considerable number of design drawings. The number of drawings is estimated to be well over 1,000. A large number consist of vendor type drawings, furnished by both Pacific Northwest National Laboratory (PNNL) and SPAR Aerospace Limited (SPAR). A smaller number, approximately 200, are H-6 type drawing sheets in the Project Hanford Management Contract (PHMC) document control system. A preliminary inspection of the drawings showed that the physical configuration of the LDUA did not match the documented configuration. As a result of these findings, a scoping walkdown of 20 critical drawing sheets was performed to determine if a problem existed in configuration management of the LDUA system. The results of this activity showed that 18 of the 20 drawing sheets were found to contain errors or omissions of varying concern. Given this, Characterization Engineering determined that a walkdown of the drawings necessary and sufficient to enable safe operation and maintenance of the LDUA should be performed. A review team was assembled to perform a review of all of the drawings and determine the set which would need to be verified through an engineering walkdown. The team determined that approximately 150 H-6 type drawing sheets would need to be verified, 12 SPAR/PNNL drawing sheets would need to be verified and converted to H-6 drawings, and three to six new drawings would be created (see Appendix A). This report documents the results of that walkdown.

Smalley, J.L.

1998-09-25T23:59:59.000Z

2

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993  

SciTech Connect

Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

Not Available

1994-03-01T23:59:59.000Z

3

Enhancement of methane conversion using electric fields. Quarterly report, October 1--December 31, 1996  

DOE Green Energy (OSTI)

The goal of this project is the development of novel, economical, processes for the conversion of natural gas to more valuable projects such as methanol, ethylene and other organic oxygenates or higher hydrocarbons. The methodologies of the project are to investigate and develop low temperature electric discharges and electric field-enhanced catalysis for carrying out these conversions. In the case of low temperature discharges, the conversion is carried out at ambient temperature which in effect trades high temperature thermal energy for electric energy as the driving force for conversion. The low operating temperatures relax the thermodynamic constraints on the product distribution found at high temperature and also removes the requirements of large thermal masses required for current technologies. With the electric field-enhanced conversion, the operating temperatures are expected to be below those currently required for such processes as oxidative coupling, thereby allowing for a higher degree of catalytic selectivity while maintaining high activity. During this quarter the authors worked on some kinetics experiments and also did some catalyst screening, particularly looking for correlations with surface OH and oxygen groups to help determine the manner in which these surfaces alter the selectivities. On the dielectric systems they looked at power versus frequency and conversions relationships, worked on oxygen utilization and started building a short residence time reactor for studying intermediate formation and destruction.

NONE

1996-12-31T23:59:59.000Z

4

Field Verification Program for Small Wind Turbines: Quarterly Report for January-March 2001; 1st Quarter, Issue No.4  

DOE Green Energy (OSTI)

This newsletter provides a brief overview of the Field Verification Program for Small Wind Turbines conducted out of the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

Forsyth, T.; Cardinal, J.

2001-10-30T23:59:59.000Z

5

Field Demonstration of a Membrane Process to Separate Nitrogen from Natural Gas: Nineteenth Quarterly Progress Report (Second Quarter 2006)  

Science Conference Proceedings (OSTI)

The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During pre-commissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. Since that time, Membrane Technology and Research, Inc. (MTR) signed a marketing and sales partnership with ABB Lummus Global, a large multinational corporation, and is working with the company's Randall Gas Technology group, a supplier of equipment and processing technology to the natural gas industry. Randall's engineering group found a new site for the project at a North Texas Exploration (NTE) gas processing plant, and we continue, but have as yet been unsuccessful in our attempts, to negotiate with Atmos Energy for a final test of the project demonstration unit. In the meantime, MTR has located an alternative testing opportunity and signed a contract for a demonstration plant in Rio Vista, CA. Several commercial sales have resulted from the partnership with ABB, and total sales of nitrogen/natural gas membrane separation units are now approaching $2.6 million.

Kaaeid Lokhandwala

2006-06-30T23:59:59.000Z

6

Develop a field grid system for yield mapping and machine control. Quarterly report, January 1, 1995--March 31, 1995  

SciTech Connect

This is a quarterly progress report describing recent efforts aimed at building and testing the Field Grid Sense (FGS) system for yield mapping and machine control during harvesting. Secondly, the aim is to use Field Grid Sense with chemical application equipment to demonstrate a workable in-field system. More specifically, the operation of the patented hardware/software FGS system will be tested in crop harvesting to demonstrate the systems` utility and to analyze the flexibility of operation under true field conditions. Additionally, FGS will again be used with chemical application equipment -- equipment that needs modification to correct one or two slight shortcomings. This action will create improved systems and establish the worthiness, efficiency and necessity of chemical application equipment that is controlled and directed via the FGS package.

Froehlich, D.P.; Schumacher, J.A.

1995-04-01T23:59:59.000Z

7

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 29, quarter ending December 31, 1981  

SciTech Connect

Highlights of progress accomplished during the quarter ending December, 1981, are summarized in this report. Discussion is presented under the following headings: chemical flooding - field projects; chemical flooding - supporting research; carbon dioxide injection - field projects; carbon dioxide injection - supporting research; thermal/heavy oil - field projects and supporting research; resource assessment technology; extraction technology; environmental aspects; petroleum processing technology; microbial enhanced oil recovery; and improved drilling technology. (DMC)

Linville, B. (ed.)

1982-05-01T23:59:59.000Z

8

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 34, quarter ending March 31, 1983  

SciTech Connect

Progress achieved for the quarter ending March 1983 are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; and thermal/heavy oil. In addition, progress reports are presented for: resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovered by gravity mining; improved drilling technology; and general supporting research. (ATT)

Linville, B. (ed.)

1983-07-01T23:59:59.000Z

9

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 36 for quarter ending September 30, 1983  

SciTech Connect

Progress reports for the quarter ending September 30, 1983, are presented for field projects and supported research for the following: chemical flooding; carbon dioxide injection; thermal/heavy oil; resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovery by gravity mining; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1984-03-01T23:59:59.000Z

10

Contracts for field projects and supporting research on enhanced oil recovery, reporting period January--March 1991. Progress review No. 66, quarter ending March 31, 1991  

SciTech Connect

Contracts for field projects and supporting research on Enhanced Oil Recovery for the quarter ending March 31, 1991 are reviewed. A list of available publications is listed. Research topics include microbial EOR, foam injection, thermal recovery, surfactant flooding, reservoir rock characterization, and more.

Not Available

1992-03-01T23:59:59.000Z

11

NY/NJ distributed wind power field verification project. Quarterly report for the period November - December 1999  

DOE Green Energy (OSTI)

This report details the Significant Accomplishments for this quarter. The accomplishments are: (1) began preparations for host site installations; and (2) data acquisition system installation at the National Wind Technology Center (NWTC) near Boulder, CO.

Putnam, Robert Jr.

2000-01-01T23:59:59.000Z

12

High-magnetic-field MHD-generator program. Quarterly report, January 1, 1981-March 31, 1981  

DOE Green Energy (OSTI)

Progress in an experimental and theoretical program designed to investigate MHD channel phenomena which are important at high magnetic fields is reported. The areas of research include nonuniformity effects, boundary layers, Hall field breakdown, the effects of electrode configuration and current concentrations, and studies of steady-state combustion disk and linear channels in an existing 6 Tesla magnet of small dimensions. In the study of the effects of nonuniformities, experiments have been performed to test a multi-channel, fiber optics diagnostic system that yields time-resolved temperature profiles in an MHD channel. For the study of magneto-acoustic fluctuation phenomena, a one-dimensional model has been developed to describe the performance of a non-ideal MHD generator with a generalized electrical configuration. The installation of the hardware for the data acquisition and reduction of the laser Doppler velocimeter data, to be used in the study of turbulence suppression in a magnetic field, has been nearly completed. A two-dimensional MHD computer code has been developed which predicts the dependence on electrode and insulator dimensions of the onset of interelectrode Hall field breakdown. Calculations have been performed of the effects of nonuniformities on the flow and electrical behavior of baseload-sized disk generators.

None

1981-04-01T23:59:59.000Z

13

High-magnetic-field MHD-generator program. Quarterly report, April 1, 1981-June 30, 1981  

DOE Green Energy (OSTI)

Progress in an experimental and theoretical program designed to investigate MHD channel phenomena which are important at high magnetic fields is described. The areas of research include nonuniformity effects, boundary layers, Hall field breakdown, the effects of electrode configuration and current concentrations, and studies of steady-state combustion disk and linear channels in an existing 6 Tesla magnet of small dimensions. In the study of the effects of nonuniformities, experiments have been performed to test a multi-channel, fiber optics diagnostic system that yields time-resolved temperature profiles in an MHD channel. For the study of magneto-acoustic fluctuation phenomena, a one-dimensional model has been developed to describe the performance of a non-ideal MHD generator with a generalized electrical configuration. The installation of the hardware for the data acquisition and reduction of the laser Doppler velocimeter data, to be used in the study of turbulence suppression in a magnetic field, has been nearly completed and preliminary software has been written. A two-dimensional MHD computer code has been developed which predicts the dependence on electrode and insulator dimensions of the onset of interelectrode Hall field breakdown, as initiated either by breakdown in the insulator or in the plasma. There is good agreement between calculation and measurements. Calculations have been performed of the effects of nonuniformities on the flow and electrical behavior of baseload-sized disk generators. Also, predictions of the performance of baseload inflow disk generators have been calculated and compared with linear generators.

Kruger, C.H.; Eustis, R.H.; Mitchner, M.; Self, S.A.; Koester, J.K.; Nakamura, T.

1981-07-01T23:59:59.000Z

14

High-magnetic-field MHD-generator program. Quarterly report, January 1, 1982-March 30, 1982  

DOE Green Energy (OSTI)

This report summaries progress in an experimental and theoretical program designed to investigate a number of important problems in the development of MHD generator channels. The areas of research include nonuniformity and stability effects, boundary layers, Hall field breakdown, the effects of electrode configuration and current concentrations, and studies of steady-state combustion disk and linear channels in a 6-Tesla magnet of small dimensions.

Kruger, C.H.; Eustis, R.H.; Mitchner, M.; Self, S.A.; Koester, J.K.; Nakamura, T.

1982-04-01T23:59:59.000Z

15

High-magnetic-field MHD-generator program. Quarterly report, July 1, 1981-September 30, 1981  

DOE Green Energy (OSTI)

Progress in an experimental and theoretical program designed to investigate a number of important problems in the development of MHD generator channels is described. The areas of reseach include nonuniformity and stability effects, boundary layers, Hall field breakdown, the effects of electrode configuration and current concentrations, and studies of steady-state combustion disk and linear channels in a 6 Tesla magnet of small dimensions. In the area of magneto-acoustic disturbances, a major experiment to study the formation and behavior of propagating waves in a combustion MHD was completed, using the M-2 facility. The results of this experiment are currently being compared with a theoretical model previously developed at Stanford. For the study of the effects of nonuniformities on generator performance, a diagnostic system for measurement of plasma temperature profiles and also a nitrogen injection device were satisfactorily tested in the M-2 flowtrain. An improved laser Doppler velocimeter system for the study of turbulence suppression in a magnetic field has been developed and tested, both on the bench and with the MHD flowtrain. The theoretical model of Hall field breakdown has been modified to better account for the effects of current concentrations. The peg-wall test section of the six-Tesla disk generator has been successfully tested under full thermal and electrical conditions. (WHK)

Kruger, C.H.; Eustis, R.H.; Mitchner, M.; Self, S.A.; Koester, J.K.; Nakamura, T.

1981-10-01T23:59:59.000Z

16

High magnetic field MHD generator program. Quarterly report, October 1-December 31, 1980  

DOE Green Energy (OSTI)

Progress is reported in an experimental and theoretical program designed to investigate MHD channel phenomena which are important at high magnetic fields. The areas of research include nonuniformity effects, boundary layers, Hall field breakdown, the effects of electrode configuration and current concentrations, and studies of steady-state combustion disk and linear channels in an existing 6 Tesla magnet of small dimensions. In the study of the effects of nonuniformities and instabilities, theoretical models have been further developed and limits of applicability have been established. An improved laser doppler anemometer, which has been designed for turbulence damping and velocity profile measurements, has been tested in the M-2 facility with favorable results. The theoretical model of Hall field breakdown has been modified to include a two-dimensional insulator analysis, along with a detailed description of the plasma flow over the electrode wall. The model has the capability of predicting both insulator and plasma breakdown and has yielded good agreement with the results of breakdown experiments. The performance of electrode configurations with axial conducting fins has been examined using a three-dimensional numerical solution of the MHD electrical equations. Work progressed on the construction of the peg wall disk generator channel, and the main components of the generator test section are now assembled. Theoretical models of boundary layer effects on the insulator wall and the current discharge in the core are being developed. Data from the linear channel experiment at 5 Tesla are being analyzed and interpreted.

Kruger, C.H.; Eustis, R.H.; Mitchner, M.; Self, S.A.; Koester, J.K.; Nakamura, T.

1981-01-01T23:59:59.000Z

17

Field geology of the northwest quarter of the Broken Top 15' quadrangle, Deschutes County, Oregon  

DOE Green Energy (OSTI)

The report is a compilation of geologic field observations and supporting laboratory data obtained during a study of the eastern slope of the High Cascade Range of Oregon, north of Broken Top volcano. General geologic relationships are summarized, then followed by lithologic descriptions, petrographic characteristics, and stratigraphic information, cross-indexed to tables of chemical analyses of pertinent rock units. The 7.5-minute N.W. Broken Top quadrange is bounded by 44/sup 0/07'30'' and 44/sup 0/15'00'' north latitude and by 121/sup 0/37'30'' and 121/sup 0/45'00'' west longitude, 6 km east of North and Middle Sister volcanoes and 35 km northwest of Bend. The quadrangle is covered by glacial till and calc-alkaline lavas, most of which originated on the adjacent slopes of the High Cascades. Basalt, basaltic andesite, andesite, and rhyodacite are represented in a variety of forms including lava flows, volcanic domes, cinder cones, and a welded ash-flow tuff.

Taylor, E.M.

1987-01-01T23:59:59.000Z

18

K Basins Field Verification Program  

SciTech Connect

The Field Verification Program establishes a uniform and systematic process to ensure that technical information depicted on selected engineering drawings accurately reflects the actual existing physical configuration. This document defines the Field Verification Program necessary to perform the field walkdown and inspection process that identifies the physical configuration of the systems required to support the mission objectives of K Basins. This program is intended to provide an accurate accounting of the actual field configuration by documenting the as-found information on a controlled drawing.

Booth, H.W.

1994-12-02T23:59:59.000Z

19

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 70, quarter ending March 31, 1992  

Science Conference Proceedings (OSTI)

Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology. A list of available publication is also provided.

Not Available

1993-03-01T23:59:59.000Z

20

Full scale field demonstration of unheated anaerobic contact stabilization. Quarterly project status report, July 1980-September 1980  

DOE Green Energy (OSTI)

Progress is reported on digester operation for the quarter ending September 1980. Gas production data is included. At present, the experimental digester (not heat added) is operating at an SRT of about 17 days and a temperature of 78/sup 0/F and is performing about the same as the control units operating at an SRT of 10 days and a temperature of 94/sup 0/T. (DMC)

Sykes, R.M.

1980-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Quarterly oil report: Third quarter, 1987. [CA  

Science Conference Proceedings (OSTI)

The volumes of petroleum fuels supplied to California in the fourth quarter of 1987 increased 1.6 percent from year ago levels. The increase is the result of increased unleaded gasoline and residual fuel oil use. Other fourth quarter results show that all product imports remained higher than year ago levels, but most were below the previous quarter except unleaded gasoline. Unleaded gasoline imports were higher, exports were reduced and stocks drawn down in the fourth quarter compared to the previous quarter to meet increased demand for unleaded fuel. Demand for low sulfur fuel oil increased toward the end of the quarter because natural gas sales to electric utilities were curtailed.

Not Available

1988-01-01T23:59:59.000Z

22

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 47, Quarter ending June 1986  

SciTech Connect

Progress reports are presented for field projects and supporting research for the following: chemical flooding; gas displacement; thermal recovery; resource assessment; environmental technology; and microbial technology. (AT)

Not Available

1987-07-01T23:59:59.000Z

23

Develop a field grid system for yield mapping and machine control. Quarterly report, July 1, 1995--September 30, 1995  

SciTech Connect

Build and test the Field Grid Sense system for yield mapping and machine control during harvesting. Secondly, use Field Grid Sense with chemical application equipment to demonstrate a workable in-field system. More specifically, the operation of the patented hardware/software Field Grid Sense (FGS) system will be tested in crop harvesting to demonstrate the system`s utility and to analyze the flexibility of operation under true field conditions. Additionally, FGS will again be used with chemical application equipment - equipment that needs modification to correct one or two slight shortcomings. This action will create improved systems and establish the worthiness, efficiency and necessity of chemical application equipment that is controlled and directed via the FGS package.

Hart, F.; Windish, J.

1995-10-01T23:59:59.000Z

24

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994  

Science Conference Proceedings (OSTI)

This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

NONE

1995-05-01T23:59:59.000Z

25

Development of automated welding process for field fabrication of thick walled pressure vessels. (First quarterly report, FY 1981)  

SciTech Connect

The choice of sets of root welding parameters is discussed. Thick field demonstration/qualification welds will be performed. A welding procedure handbook which will be prepared is mentioned. (DLC)

Schneider, U.A.

1981-01-01T23:59:59.000Z

26

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 44, quarter ending September 30, 1985  

SciTech Connect

Progress reports are presented for: field projects and supporting research for chemical flooding and gas displacement; supporting research for thermal methods; microbial technology; research assessment technology; and environmental technology.

Not Available

1986-09-01T23:59:59.000Z

27

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 48, Quarter ending September 30, 1986  

SciTech Connect

Progress reports are presented for: (1) chemical flooding (field projects and supporting research); (2) gas displacement (supporting research); (3) thermal methods (supporting research); (4) resource assessment technology; (5) environmental technology; and (5) microbial technology.

Not Available

1987-09-01T23:59:59.000Z

28

Contracts for field projects and supporting research on enhanced oil recovery. Progress Review No. 39, quarter ending June 30, 1984  

SciTech Connect

Progress reports are presented for field tests and supporting research for the following: chemical flooding; gas displacement; thermal recovery/heavy oil; resource assessment technology; extraction technology; and microbial enhanced oil recovery.

Linville, B. (ed.)

1984-12-01T23:59:59.000Z

29

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 41, quarter ending December 31, 1984  

SciTech Connect

Progress reports are presented for field tests and supporting research for the following: chemical flooding; gas displacement; thermal recovery/heavy oil; resource assessment technology; extraction technology; environmental technology; and microbial enhanced oil recovery.

Linville, B. (ed.)

1985-07-01T23:59:59.000Z

30

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 45, Quarter ending December 31, 1985  

Science Conference Proceedings (OSTI)

Progress reports are presented for field tests and supporting research for the following: chemical flooding; gas displacement; thermal methods; resource assessment; environmental technology; and microbial enhanced oil recovery. (AT)

Not Available

1986-12-01T23:59:59.000Z

31

Contracts for field projects and supporting research on enhanced oil recovery. Progress Review No. 42, quarter ending March 31, 1985  

Science Conference Proceedings (OSTI)

Progress reports are presented for field tests and supporting research for the following: chemical flooding; gas displacement; thermal recovery/heavy oil; resource assessment technology; extraction technology; environmental technology; and microbial enhanced oil recovery.

Linville, B. (ed.)

1985-11-01T23:59:59.000Z

32

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 51 quarter ending June 30, 1987  

Science Conference Proceedings (OSTI)

This Progress review on enhanced oil recovery covers: Chemical Flooding /emdash/ Field Projects; Chemical Flooding /emdash/ Supporting Research; Gas Displacement /emdash/ Supporting Research; Thermal Recovery /emdash/ Supporting Research; Resource Assessment Technology; Geoscience; Environmental Technology; Microbial Technology.

Not Available

1988-05-01T23:59:59.000Z

33

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 40, quarter ending September 30, 1984  

SciTech Connect

Progress reports are presented for field tests and supporting research for the following: chemical flooding; gas displacement; thermal recovery/heavy oil; resource assessment technology; extraction technology; and microbial technology.

Linville, B. (ed.)

1985-05-01T23:59:59.000Z

34

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 43, quarter ending June 30, 1985  

Science Conference Proceedings (OSTI)

Progress reports are presented for field projects and supporting research for the following: (1) chemical flooding; gas displacement thermal recovery/heavy oil; resource assessment technology; extraction technology;environmental technology; and microbial technology. (AT)

Not Available

1986-05-01T23:59:59.000Z

35

Develop a field grid system for yield mapping and machine control. Quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect

The operation of the patented hardware/software Field Grid Sense (FGS) system is being tested in crop harvesting in order to demonstrate the systems`s utility and to analyze the flexibility of operation under true field conditions. FGS is also being used with chemical application equipment. This action will create improved systems and establish the worthiness, efficiency and necessity of chemical application equipment that is controlled and directed via the FGS package.

Froehlich, D.P.; Schumacher, J.A.

1995-07-01T23:59:59.000Z

36

Third and Fourth Quarter Financial Guidance | National Nuclear...  

National Nuclear Security Administration (NNSA)

Financial Guidance Home > About Us > Our Operations > Acquisition and Project Management > Office of Financial Field Management > Third and Fourth Quarter Financial Guidance...

37

Field study of disposed wastes from advanced coal processes. Quarterly technical progress report, April--June 1992  

Science Conference Proceedings (OSTI)

The Department of Energy/Morgantown Energy Technology Center (DOE/METC) has initiated research on the disposal of solid wastes from advanced coal processes. The objective of this research is to develop information to be used by private industry and government agencies for planning waste disposal practices associated with advanced coal processes. To accomplish this objective, DOE has contracted Radian Corporation and the North Dakota Energy & Environmental Research Center (EERC) to design, construct, and monitor a limited number of field disposal tests with advanced coal process wastes. These field tests will be monitored over a three year period with the emphasis on collecting data on the field disposal of these wastes. There has been considerable research on the characteristics and laboratory leaching behavior of coal wastes -- a lesser amount on wastes from advanced coal processes. However, very little information exists on the field disposal behavior of these wastes. Information on field disposal behavior is needed (a) as input to predictive models being developed, (b) as input to the development of rule of thumb design guidelines for the disposal of these wastes, and (c) as evidence of the behavior of these wastes in the natural environment.

Not Available

1992-12-31T23:59:59.000Z

38

Contracts for field projects and supporting research on enhanced oil recovery. Progress review quarter ending September 30, 1993  

SciTech Connect

Progress reports are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and field demonstrations in high-priority reservoir classes. A list of available publications is also included.

Not Available

1994-08-01T23:59:59.000Z

39

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996  

SciTech Connect

Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

NONE

1997-05-01T23:59:59.000Z

40

FY 2010 Third Quarter Report Comparison of Aerosol and Cloud Condensation Nuclei (CCN) Relationship Parameterizations with Data Collected During the 2008 VAMOS Ocean-Cloud-Atmosphere Land Study (VOCALS) Field Campaign  

Science Conference Proceedings (OSTI)

Metric for Quarter 3: Report comparisons of aerosol/CCN relationship parameterizations with data collected in the first quarter and best parameterization for VOCALS data set.

Wang, J; Daum, PH; Kleinman, LI; Lee, YN; McGraw, R; Sedlacek, AJ; Senum, G; Springston, SR

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992  

Science Conference Proceedings (OSTI)

Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

Not Available

1993-09-01T23:59:59.000Z

42

Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992  

Science Conference Proceedings (OSTI)

Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

Not Available

1993-12-01T23:59:59.000Z

43

EPRI Fukushima Daini Independent Review and Walkdown  

Science Conference Proceedings (OSTI)

On Friday March 11, 2011, the powerful earthquake that struck off northeast Japan generated large tsunami waves that drove seawater into seven of the Fukushima Daini Nuclear Power Station's eight heat exchanger buildings and one of the reactor buildings. Although the station's four reactors tripped as a result of the earthquake, water damage in the heat exchanger buildings resulted in the loss of cooling capability to remove decay heat in three of the reactors. In responding to the tsunami, the reactor ...

2011-08-15T23:59:59.000Z

44

Quarterly Coal Distribution Report 1st Quarter 2012  

U.S. Energy Information Administration (EIA)

1st Quarter 2012 June 2012 Quarterly Coal Distribution Report www.eia.gov U.S. Department of Energy Washington, DC 20585

45

Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA)

October 2012 Independent Statistics & Analysis www.eia.gov . U.S. Department of Energy Washington, DC 20585 . Quarterly Coal Distribution Report 2nd Quarter 2012

46

Quarterly Coal Distribution Report 3rd Quarter 2011  

U.S. Energy Information Administration (EIA)

3rd Quarter 2011 January 2012 Quarterly Coal Distribution Report www.eia.gov U.S. Department of Energy Washington, DC 20585

47

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1998 1 March 1998 1 continued on page 2 For First Quarter FY 1998 March 2, 1998, Issue No. 14 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Managing Progress on the Repository EIS How to Move a Mountain Tour members approach the entry to the Yucca Mountain Exploratory Studies Facility. The EIS Management Council, along with members and technical advisors of the EIS Preparation Team, visited the site in January while participating in briefings on technical, legal, and policy issues. How do you manage preparation of a major EIS that is important to five Program Offices, four Field Offices, and other Federal agencies, not to mention a wide array of stakeholders? How do you address extremely complex and

48

AAI Quarterly Meeting Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI Quarterly Meeting Minutes August 1, 2007 AAI Updates - Rod Gerig USPAS Schools * USPAS 2008 Winter School - University of California, Santa Cruz January 14-25, 2008 * USPAS...

49

Quarterly Coal Report  

Annual Energy Outlook 2012 (EIA)

December 2010 DOEEIA-0121 (201003Q) Revised: July 2012 Quarterly Coal Report July - September 2010 December 2010 U.S. Energy Information Administration Office of Oil, Gas, and...

50

Federal Technical Capability Program - Quarterly Performance Indicator  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Performance Indicator Reports Quarterly Performance Indicator Reports 2013 Quarterly Report on Federal Technical Capability August 16, 2013 Quarterly Report on Federal Technical Capability June 5, 2013 Quarterly Report on Federal Technical Capability February 20, 2013 2012 Quarterly Report on Federal Technical Capability November 20, 2012 Quarterly Report on Federal Technical Capability August 8, 2012 Quarterly Report on Federal Technical Capability May 30, 2012 Quarterly Report on Federal Technical Capability March 6, 2012 2011 Quarterly Report on Federal Technical Capability November 10, 2011 Quarterly Report on Federal Technical Capability August 24, 2011 Quarterly Report on Federal Technical Capability May 18, 2011 Quarterly Report on Federal Technical Capability February 23, 2011

51

EIA -Quarterly Coal Distribution  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Distribution Coal Distribution Home > Coal> Quarterly Coal Distribution Back Issues Quarterly Coal Distribution Archives Release Date: June 27, 2013 Next Release Date: September 2013 The Quarterly Coal Distribution Report (QCDR) provides detailed quarterly data on U.S. domestic coal distribution by coal origin, coal destination, mode of transportation and consuming sector. All data are preliminary and superseded by the final Coal Distribution - Annual Report. Year/Quarters By origin State By destination State Report Data File Report Data File 2009 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf October-December pdf xls pdf 2010 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf xls

52

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

1991-08-15T23:59:59.000Z

53

Tennessee Energy Statistics Quarterly, third quarter 1984  

Science Conference Proceedings (OSTI)

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow - production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1984-01-01T23:59:59.000Z

54

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

March 2011 DOEEIA-0121 (201004Q) Revised: July 2012 Quarterly Coal Report October - December 2010 March 2011 U.S. Energy Information Administration Office of Oil, Gas, and Coal...

55

Lessons Learned Quarterly Report, September 1997  

Energy.gov (U.S. Department of Energy (DOE))

Welcome again to the Quarterly Report on lessons learned in the NEPA process. This issue features NEPA success stories from field organizations: how the NEPA process helped resolve cultural resource protection issues at Fernald, and how innovative approaches are aiding preparation of a Site-wide EIS for Sandia, New Mexico.

56

1Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January to March 2002. Data for these indicators are gathered by the Field...

57

4Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"The Facility Representative Program Performance Indicators Quarterly Report is attached, covering the period from October to December 2000. Data for these indicators are gathered by the Field...

58

Tennessee Energy Statistics Quarterly. Second quarter 1984  

SciTech Connect

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity. The Tennessee Energy Statistics Quarterly has been developed by the Tennessee Energy Data Base Program to serve as a supplement to the Energy Division publication - The Tennessee Energy Profiles: 1960-1980. Historical data reported in this volume cover the production and utilization of major energy supplies by fuel type and economic sectors, as well as other energy data such as prices and fuel distribution. 12 figures, 12 tables.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1985-01-01T23:59:59.000Z

59

Quarterly Coal Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Report Quarterly Coal Report Release Date: October 02, 2013 | Next Release Date: December 2013 | full report Previous Quarterly Coal Data historical data (PDF): 1st quarter 2013 4th quarter 2012 3rd quarter 2012 2nd quarter 2012 1st quarter 2012 4th quarter 2011 3rd quarter 2011 2nd quarter 2011 1st quarter 2011 prior to 2011 Go The Quarterly Coal Report (QCR) provides detailed quarterly data on U.S. coal production, exports, imports, receipts, prices, consumption, quality, stocks, and refined coal. Data on U.S. coke production, consumption, stocks, imports, and exports are also provided. All data for 2011 and prior years are final. All data for 2012 and 2013 are preliminary. Highlights for second quarter 2013: U.S. coal production during second quarter 2013 totaled 243.1

60

Back Issues of the Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

coal > Quarterly Coal Report > Quarterly Coal Report Back Issues Quarterly Coal Report Back Issues of the Quarterly Coal Report Year 4thquarter 3rdquarter 2ndquarter 1stquarter QCR...

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Lessons Learned Quarterly Report Cumulative Index | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Requirements Lessons Learned Lessons Learned Quarterly Report Cumulative Index Lessons Learned Quarterly Report Cumulative Index Guidance Requirements Lessons...

62

SOP Quarterly Report FY-94 3rd Quarter  

NLE Websites -- All DOE Office Websites (Extended Search)

Hybrid Vehicle Program Site Operator Program Quarterly Progress Report for April thru June 1994 (3rd Quarter of FY-1994) INEL-940072-Qtr 3 Formerly: EGG-EP-11237-Qtr 3 D. M. Kiser...

63

EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter  

SciTech Connect

The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

Showalter, Mary Ann

2008-09-16T23:59:59.000Z

64

EMSL Quarterly Highlights Report: 4th Quarter, FY08  

SciTech Connect

This report outlines the science highlights, publications, and other happenings at EMSL in 4th quarter of FY08.

Showalter, Mary Ann

2008-11-24T23:59:59.000Z

65

EMSL Quarterly Highlights Report: FY09, 4th Quarter  

Science Conference Proceedings (OSTI)

This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

2009-10-21T23:59:59.000Z

66

EMSL Quarterly Highlights Report: FY09, 3rd Quarter  

Science Conference Proceedings (OSTI)

This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

2009-07-17T23:59:59.000Z

67

Short-term energy outlook. Quarterly projections, second quarter 1996  

Science Conference Proceedings (OSTI)

The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

NONE

1996-04-01T23:59:59.000Z

68

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

June 2010 DOE/EIA-0121 (2010/01Q) June 2010 DOE/EIA-0121 (2010/01Q) Revised: July 2012 Quarterly Coal Report January - March 2010 June 2010 U.S. Energy Information Administration Office of Oil, Gas, and Coal Supply Statistics U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.gov/coal/production/quarterly/ _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of

69

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2008 December 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

70

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2008 September 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

71

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

8/04Q) 8/04Q) Quarterly Coal Report October - December 2008 March 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

72

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Quarterly Coal Report January - March 2008 July 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

73

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2009 September 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

74

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

7/01Q) 7/01Q) Quarterly Coal Report January - March 2007 June 2007 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

75

Contracts for field projects and supporting research on enhanced oil recovery. Quarterly technical progress report, October 1994--December 1994. Progress review No. 81  

SciTech Connect

This document consists of a publications list for field projects and brief descriptions of research projects on enhanced petroleum recovery.

1996-03-01T23:59:59.000Z

76

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1993-08-15T23:59:59.000Z

77

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 21, quarter ending December 31, 1979  

Science Conference Proceedings (OSTI)

Individual report are presented of contracts for field projects and supporting research on chemical flooding, CO/sub 2/ injection, thermal/heavy oil, resource assessment technology, improved drilling technology, residual oil, environment, and petroleum technology. (DLC)

Linville, B. (ed.)

1980-04-01T23:59:59.000Z

78

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 26, quarter ending March 31, 1981  

SciTech Connect

Objectives and technical progress are summarized for field projects and supporting research in chemical flooding, CO/sub 2/ injection, thermal/heavy oil recovery, resource assessment, extraction technology, microbial enhanced oil recovery, and improved drilling technology. (DLC)

Linville, B. (ed.)

1981-07-01T23:59:59.000Z

79

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 37, quarter ending December 31, 1983  

SciTech Connect

Project reports are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; thermal methods; resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; and general supporting research.

Linville, B. (ed.)

1984-08-01T23:59:59.000Z

80

(California Energy Commission) quarterly oil report, first quarter 1991  

SciTech Connect

The total volume of petroleum fuels supplied in the first quarter of 1991 declined 5 percent (7.4 million barrels) from a year ago and 0.6 percent (0.9 million barrels) from the previous quarter. Unleaded gasoline volumes supplied were 2.6 percent (1.7 million barrels) higher in the first quarter than a year ago. Aviation fuel volumes supplied in the first quarter were 3.6 percent (0.8 million barrels) higher than a year ago. Distillate fuel volumes supplied in the first quarter were 5.2 percent (1.2 million barrels) lower than a year ago. Low sulfur fuel oil volumes supplied in the first quarter were 68 percent (2.9 million barrels) lower than a year ago. Electric utility use was 88 percent (2.9 million barrels) lower than a year ago. Petroleum fuel stocks were 4 percent (2.4 million barrels) higher than a year ago and 1.4 percent (0.8 million barrels) higher than the previous quarter. The average international crude oil price in the first quarter of 1991 was $18.43 per barrel, 1.1 percent higher than a year ago, but 37 percent below the previous quarter. The California Kern River average crude oil price in the first quarter of 1991 was $12.41 per barrel, 21 percent lower than a year ago and 43 percent lower than the previous quarter. Self-serve retail gasoline prices in the first quarter of 1991 were 12 to 17 percent higher than a year ago. Refiners produced an average of 2 million barrels of petroleum products per day in the first quarter of 1991, 6 percent less than a year ago and 3.5 percent less than the previous quarter. The statewide refinery utilization rate was 84.9 percent in the first quarter of 1991, down from 86.7 percent in the previous quarter and 95.2 percent from a year ago. 19 figs. 13 tabs.

1991-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Quarterly Coal Distribution Report 4th Quarter 2011  

U.S. Energy Information Administration (EIA)

Coal receipts as provided in the Quarterly Coal Distribution Report for the Electricity Generation sector are less than the total quantities reported ...

82

Quarterly Coal Distribution Report 3rd Quarter 2012  

U.S. Energy Information Administration (EIA)

December 2012 Independent Statistics & Analysis www.eia.gov . U.S. Department of Energy Washington, DC 20585 . Quarterly Coal Distribution Report

83

Short-term energy outlook. Quarterly projections, Third quarter 1995  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

NONE

1995-08-02T23:59:59.000Z

84

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010  

Science Conference Proceedings (OSTI)

This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

2010-02-04T23:59:59.000Z

85

Lessons Learned Quarterly Report, March 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2001 Lessons Learned Quarterly Report, March 2001 Lessons Learned Quarterly Report, March 2001 Welcome to the 26th quarterly report on lessons learned in the NEPA process. Articles included in this issue: Innovative Field Research Benefits from NEPA Review Mini-guidance: $aving $ on EIS Distribution NEPA Office Needs Fewer Paper Copies of Issued Documents Analyzing All Reasonable Alternatives in an EIS NOAA Issues New Coastal Zone Regulations DOE Solicits Comments on Public Participation Policy More NNSA NEPA Procedures BLM Tool for Better Scoping Comments NEPA Staff Supported CEQ Technology Task Force Transitions When to Provide Cost Estimates in Annual NEPA Planning Summaries Some Considerations in Selecting NEPA Document Preparers DOE-Wide NEPA Contracts Update

86

Lessons Learned Quarterly Report, June 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1996 1996 Lessons Learned Quarterly Report, June 1996 Welcome again to the Quarterly Report of Lessons Learned in the NEPA process. This Quarterly Report includes: March 1996 NEPA Contracting Workshop: Do it Right the First Time EIS Coordination between Headquarters and Field Bounding Analysis in DOE NEPA Documents Questions and Answers on EIS References Suggestions from a NEPA Document Manager (Hanford K-Basins Spent Fuel EIS) Toll-Free Phone for Public Involvement Video Conferencing for Public Hearings Alternative Dispute Resolution and the NEPA Process Litigation Updates Comments on Proposed Amendments to DOE NEPA Regulations Second quarter FY 1996 Lessons Learned Questionnaire results,including EIS and EA cost and time reports Analysis of recent trends in costs and time

87

High Hopes, Tight Quarters  

NLE Websites -- All DOE Office Websites (Extended Search)

Hopes, Hopes, Tight Quarters Unique Recycler, world's largest array of permanent magnets, taking shape in crowded Main Injector tunnel. by Mike Perricone, Office of Public Affairs The magnets are numbered in the hundreds; their weight is measured in tons. The available space in the tunnel is usually about four and a half feet, but it can be as little as two or three inches, and the forklifts doing the moving have been custom- designed for these tight quarters. The obstacles include water systems, cable trays, workers performing other installations, and the precisely aligned components of the signature Main Injector accelerator. The consequences of a possible slip-up: Don't even ask. Installation crews can put eight to 10 magnets in place in a day, if the magnets are located close together. Installing a magnet

88

Fourth Quarter FY 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2009 1 December 2009 1 Fourth Quarter FY 2009 December 1, 2009; Issue No. 61 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 8) DOE Begins Online Posting of Categorical Exclusion Determinations The Department of Energy (DOE) is now posting most of its categorical exclusion (CX) determinations on the web under a policy that went into effect November 2, 2009. In establishing the policy, Deputy Secretary Daniel B. Poneman referred to President Obama's commitment to "creating an unprecedented level of openness in Government," including by posting information online. "Such openness is especially important when the information relates to the Department's

89

EMSL Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

th Quarter, Fiscal Year 2008 th Quarter, Fiscal Year 2008 (July 1, 2008, through September 30, 2008) DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by

90

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

1990-08-15T23:59:59.000Z

91

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995  

Science Conference Proceedings (OSTI)

This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

NONE

1996-06-01T23:59:59.000Z

92

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 33, quarter ending December 31, 1982  

SciTech Connect

Progress reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, resource assessment technology, extraction technology, environmental and safety, microbial enhanced oil recovery, oil recovery by gravity mining, improved drilling technology, and general supporting research.

Linville, B. (ed.)

1983-04-01T23:59:59.000Z

93

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress Review No. 31, quarter ending June 30, 1982  

Science Conference Proceedings (OSTI)

Progress reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, resource assessment technology, extraction technology, environmental, petroleum technology, microbial enhanced oil recovery, oil recovery by gravity mining, improved drilling technology, and general supporting research.

Linville, B. (ed.)

1982-10-01T23:59:59.000Z

94

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 27, for quarter ending June 30, 1981  

Science Conference Proceedings (OSTI)

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, as well as for the following areas of research: resource assessment technology; extraction technology; environmental; microbial enhanced oil recovery; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1981-09-01T23:59:59.000Z

95

Progress review No. 24: contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress report, quarter ending September 30, 1980  

Science Conference Proceedings (OSTI)

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection and thermal/heavy oil, as well as for the following areas of research: extraction technology; resource assessment technology; environmental; petroleum technology; microbial enhanced oil recovery; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1981-02-01T23:59:59.000Z

96

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 32, quarter ending September 30, 1982  

SciTech Connect

Progress reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, resource assessment technology, extraction technology, environmental and safety, microbial enhanced oil recovery, oil recovery by gravity mining, improved drilling technology, and general supporting research.

Linville, B. (ed.)

1983-01-01T23:59:59.000Z

97

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 30, quarter ending March 31, 1982  

SciTech Connect

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, as well as for the following areas of research: resource assessment technology; extraction technology; microbial enhanced oil recovery; improved drilling technology, and general supporting research.

Linville, B. (ed.)

1982-07-01T23:59:59.000Z

98

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 35, quarter ending June 30, 1983  

Science Conference Proceedings (OSTI)

Progress reports are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; thermal/heavy oil; resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; improved drilling technology; and general supporting research.

Linville, B. (ed.)

1983-10-01T23:59:59.000Z

99

Progress review No. 25: contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress report, quarter ending December 31, 1980  

Science Conference Proceedings (OSTI)

Reports are presented of contracts for field projects and supporting research on chemical flooding, carbon dioxide injection, thermal/heavy oil, as well as for the following areas of research: resource assessment technology; extraction technology; environmental; microbial enhanced oil recovery; improving drilling technology; and general supporting research.

Linville, B. (ed.)

1981-05-01T23:59:59.000Z

100

OpenEI Community - quarterly meeting  

Open Energy Info (EERE)

http:en.openei.orgcommunitytaxonomyterm2260 en GRR 3rd Quarter - Stakeholder Update Meeting http:en.openei.orgcommunitybloggrr-3rd-quarter-stakeholder-update-meeting...

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Quarterly Nuclear Deployment Scorecard - October 2013 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - October 2013 Quarterly Nuclear Deployment Scorecard - October 2013 News Updates Dominion has filed an updated integrated resource plan with...

102

Quarterly Coal Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

The Quarterly Coal Report (QCR) provides detailed quarterly data on U.S. coal production, exports, imports, receipts, prices, consumption, quality, stocks, and ...

103

An integrated study of the Grayburg/San Andres Reservoir, Foster and South Cowden Fields, Ector County, Texas. Quarterly progress report, April 1995--June 1995  

Science Conference Proceedings (OSTI)

The principal objective of this research is to demonstrate in the field that 3D seismic data can be used to aid in identifying porosity zones, permeability barriers and thief zones and thereby improve waterflood design. Geologic and engineering data will be integrated with the geophysical data to result in a detailed reservoir characterization. Reservoir simulation will then be used to determine infill drilling potential and the optimum waterflood design for the project area. This design will be implemented and the success of the waterflood evaluated.

Reeves, J.J.; Rowland, D.A.; Trentham, R.C.

1995-10-01T23:59:59.000Z

104

An integrated study of the Grayburg/San Andres reservoir, Foster and south Cowden fields, Ector County, Texas. Quarterly report, January 1--March 31, 1996  

SciTech Connect

The principal objective of this research is to demonstrate in the field that 3D seismic data can be used to aid in identifying porosity zones, permeability barriers and thief zones and thereby improve waterflood design. Geologic and engineering data will be integrated with the geophysical data to result in a detailed reservoir characterization. Reservoir simulation will then be used to determine infill drilling potential and the optimum waterflood design for the project area. This design will be implemented and the success of the waterflood evaluated.

Trentham, R.C.; Weinbrandt, R.; Reeves, J.J.

1996-06-17T23:59:59.000Z

105

An integrated study of the Grayburg/San Andres Reservoir, Foster and South Cowden fields, Ector County, Texas. Quarterly report, April 1--June 31, 1996  

Science Conference Proceedings (OSTI)

The principal objective of this research is to demonstrate in the field that 3D seismic data can be used to aid in identifying porosity zones, permeability barriers and thief zones and thereby improve waterflood design. Geologic and engineering data will be integrated with the geophysical data to result in a detailed reservoir characterization. Reservoir simulation will then be used to determine infill drilling potential and the optimum waterflood design for the project area. This design will be implemented and the success of the waterflood evaluated.

Trentham, R.C.; Weinbrandt, R.; Robertson, W.

1996-10-17T23:59:59.000Z

106

An integrated study of the Grayburg/San Andres reservoir, Foster and South Cowden fields, Ector County, Texas. Quarterly report, April 1--June 31, 1996. Revision  

Science Conference Proceedings (OSTI)

The principal objective of this research is to demonstrate in the field that 3D seismic data can be used to aid in identifying porosity zones, permeability barriers and thief zones and thereby improve waterflood design. Geologic and engineering data will be integrated with the geophysical data to result in a detailed reservoir characterization. Reservoir simulation will then be used to determine infill drilling potential and the optimum waterflood design for the project area. This design will be implemented and the success of the waterflood evaluated.

Trentham, R.C.; Weinbrandt, R.; Robertson, W.

1996-10-17T23:59:59.000Z

107

Strategic petroleum reserve. Quarterly report  

SciTech Connect

The Strategic Petroleum Reserve serves as one of our most important investments in reducing the Nation`s vulnerability to oil supply disruptions. Its existence provides an effective response mechanism should a disruption occur and a formidable deterrent to the use of oil as a political instrument. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975, (Public Law 94-163) as amended, to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the first quarter of calendar year 1994, including: (1) inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; (2) fill rate for the current quarter and projected fill rate for the next calendar quarter; (3) average price of the petroleum products acquired during the calendar quarter; (4) current and projected storage capacity; (5) analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; (6) funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and (7) major environmental actions completed, in progress, or anticipated.

1994-05-15T23:59:59.000Z

108

Stockpile Stewardship Quarterly  

National Nuclear Security Administration (NNSA)

1, Number 3 * October 2011 1, Number 3 * October 2011 Message from the Assistant Deputy Administrator for Stockpile Stewardship, Chris Deeney Comments Questions or comments regarding the Stockpile Stewardship Quarterly should be directed to Terri.Batuyong@nnsa.doe.gov Technical Editor: Chris Werner, Publication Editor: Millicent Mischo Defense Programs Stockpile Stewardship in Action Volume 1, Number 3 Inside this Issue 2 Simulation: A Window into the Detonation of High Explosives 3 Modeling of High-Explosive Detonation Performance 5 The Detonation Sandwich 6 Joint DoD/DOE Munitions Technology Development Program-High Explosives 9 New Faces at the Office of Stockpile Stewardship

109

quarterly report- Jan03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Inspector General's Message 1 Top Management Challenges 2 Inadequate Controls in Unclassified Foreign Visits and Assignments Program 2 Nuclear Safety Improvements Needed at the Department's Ashtabula Site 3 Improvements Needed in the Department's Explosive Safety Program 3 Domestic Calutron Isotope Production Capabilities 4 Chiropractor Pleads Guilty to Improper Billing at Hanford 4 Contractor Employee Sentenced for Possession of Child Pornography on a Government Computer 3 Improvements Needed in Business Management Information System Greg Friedman The Office of Inspector General (OIG) is pleased to provide its Quarterly Report to the Secretary as well as the members of the Congress. This report summarizes significant audit, investigation, and

110

Quarterly Selected Financial and Operating Data  

Reports and Publications (EIA)

Presents quarterly financial data and operating data for a consistent set of major energy companies.

Information Center

2010-11-23T23:59:59.000Z

111

Increasing heavy oil reserves in the Wilmington Oil field through advanced reservoir characterization and thermal production technologies. Quarterly report, April 1, 1996--June 30, 1996  

SciTech Connect

The project involves improving thermal recovery techniques in a slope and basin clastic (SBC) reservoir in the Wilmington field, Los Angeles Co., California using advanced reservoir characterization and thermal production technologies. Inadequate characterization of the heterogeneous turbidite sands, high permeability thief zones, low gravity oil, and nonuniform distribution of remaining oil have all contributed to poor sweep efficiency, high steam-oil ratios, and early steam breakthrough. Operational problems related to steam breakthrough, high reservoir pressure, and unconsolidated formation sands have caused premature well and downhole equipment failures. In aggregate, these reservoir and operational constraints have resulted in increased operating costs and decreased recoverable reserves. The technologies include: (1) Develop three-dimensional (3-D) deterministic and stochastic geologic models. (2) Develop 3-D deterministic and stochastic thermal reservoir simulation models to aid in reservoir management and subsequent development work. (3) Develop computerized 3-D visualizations of the geologic and reservoir simulation models to aid in analysis. (4) Perform detailed study on the geochemical interactions between the steam and the formation rock and fluids. (5) Pilot steam injection and production via four new horizontal wells (2 producers and 2 injectors). (6) Hot water alternating steam (WAS) drive pilot in the existing steam drive area to improve thermal efficiency. (7) Installing an 2400 foot insulated, subsurface harbor channel crossing to supply steam to an island location. (8) Test a novel alkaline steam completion technique to control well sanding problems and fluid entry profiles. (9) Advanced reservoir management through computer-aided access to production and geologic data to integrate reservoir characterization, engineering, monitoring, and evaluation.

Hara, S.

1996-08-05T23:59:59.000Z

112

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . National Environmental Policy Act N E P . A LESSONS Office of NEPA LEARNED QUARTERLY REPORT 1ST QUARTER FY 1995 Policy and Assistance U.S. Department of Energy March 1,1995 ODU- To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment Safety and Health to solicit comments from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the process, and to distribute a quarterly summary to all,NEPA Compliance Officers and NEPA Document Managers. This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised

113

EMSL Quarterly Highlights Report 2nd Quarter FY08  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Highlights Report: 2 Quarterly Highlights Report: 2 nd Quarter, FY08 1 The W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Users are participants on accepted proposals. Staff members work with users to expedite access. The EMSL Quarterly Highlights Report documents research and activities of EMSL staff and users. Research Highlights Atmospheric Aerosol Chemistry

114

Office of Inspector General Quarterly Report | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Inspector General Quarterly Report Office of Inspector General Quarterly Report OIG summary of reports from Oct 1, 2002-December 31, 2002 Office of Inspector General Quarterly...

115

Lessons Learned Quarterly Report, June 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Quarter Recent EIS Milestones Cost and Time Facts EA Cost and Completion Time Trends Second Quarter FY 2001 Questionnaire Results Lessons Learned Quarterly Report More...

116

Natural Gas Imports and Exports - Second Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report...

117

Natural Gas Imports and Exports - Third Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012...

118

Natural Gas Imports and Exports - Second Quarter Report 2013...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports...

119

Natural Gas Imports and Exports - First Quarter Report 2013 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013...

120

Natural Gas Imports and Exports - First Quarter Report 2011 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report...

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Natural Gas Imports and Exports - Second Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports...

122

Natural Gas Imports and Exports - Third Quarter Report 2011 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report...

123

Natural Gas Imports and Exports - Second Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports...

124

Natural Gas Imports and Exports - Fourth Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports...

125

Natural Gas Imports and Exports - Second Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report...

126

Natural Gas Imports and Exports - First Quarter Report 2013 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports -...

127

Natural Gas Imports and Exports - Third Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report...

128

Natural Gas Imports and Exports - First Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - First Quarter Report 2012 Natural Gas Imports and Exports - First Quarter Report 2012 Natural Gas Imports and Exports - First Quarter Report...

129

NEPA Lessons Learned Quarterly Report, Fourth Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 Fourth Quarter FY 2006 December 1, 2006; Issue No. 49 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 6) Scoping Process Underway for Two Yucca Mountain EISs The Department of Energy (DOE) recently initiated public scoping for two EISs related to Yucca Mountain, the Nation's proposed repository for disposal of commercial

130

NEPA Lessons Learned Quarterly Report, Second Quarter FY 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 1 7 1 Second Quarter FY 2007 June 1, 2007; Issue No. 51 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A We have all been told to "work together" to accomplish a particular goal. Together Everyone Achieves More illustrates the benefi ts of "teamwork." Federal agencies, including the Council on Environmental Quality

131

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of B.D. Hong, Leader, Coal Infor- mation Team, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section should be directed

132

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Distribution Category UC-950 Quarterly Coal Report April-June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of B.D. Hong, Leader, Coal Infor- mation Team, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section should be directed to Paulette Young at (202) 426-1150, email

133

SPEAR 3 Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

through December through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management Control System (PMCS) area is now headed by Steve McNiel who replaces Teri Knight. Teri has helped set-up the PMCS operation and reporting system over the last year and we deeply appreciate her efforts. Both Steve and Teri have the experience of utilizing the Primavera/Cobra system for tracking and

134

Short-term energy outlook. Quarterly projections, third quarter 1996  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

NONE

1996-07-01T23:59:59.000Z

135

Short-term energy outlook: Quarterly projections. Second quarter 1995  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

NONE

1995-05-02T23:59:59.000Z

136

quarterly | OpenEI Community  

Open Energy Info (EERE)

Grid Data available for download on OpenEI data download OpenEI quarterly Smart Grid Smartgrid.gov SmartGrid.gov is a resource for information about the Smart Grid and...

137

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current storage capacity and ullage available; current status of the Strategic Petroleum Reserve storage facilities, major projects and the acquisition of petroleum products; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1995-11-15T23:59:59.000Z

138

NEPA Lessons Learned Quarterly Report September 2001, No. 27, Third Quarter FY 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA NEPA Lessons Lear ned September 2001 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 2001 September 4, 2001; Issue No. 28 continued on page 2 NEPA Compliance Officers Consider Further Improvements "What's New, What's Next," was the theme of the Department of Energy (DOE) NEPA Compliance Officers (NCOs) meeting on June 13 and 14, 2001, in Washington, DC. Convened by the Office of NEPA Policy and Compliance, the meeting involved 70 participants including Program and Field Office NCOs, Headquarters NEPA attorneys, and others. In welcoming participants, Carol Borgstrom, Director, Office of NEPA Policy and Compliance, recounted recent goals for DOE's NEPA Compliance Program before considering new challenges. She noted that in the 1990s, the Department achieved significant improvements

139

Lessons Learned Quarterly Report, June 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Lessons Learned Quarterly Report, June 2011 Welcome to the 67th quarterly report on lessons learned in the NEPA process. This issue showcases BPA's mitigation and monitoring activities and best practices of DOE Program and Field Offices for efficiently preparing NEPA documents, involving the public, and making a difference in the quality of environmental protection. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: Bonneville's "Balanced Scorecard" Approach to Mitigation, Monitoring, and Adaptive Management Make Reference Documents Available Online Promoting NEPA Transparency and Public Engagement "Sunshine Week" Symposium DOE Evaluating NEPA Compliance in Audits

140

Lessons Learned Quarterly Report, December 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2013 December 2013 Lessons Learned Quarterly Report, December 2013 Welcome to the 77th quarterly report on lessons learned in the NEPA process. This issue reminds us that, through teamwork and dedication by DOE's NEPA community, we can produce high quality documents that enhance the Department's decisionmaking and help protect the environment. Articles in this issue include: Was Your NEPA Process Just One More Hurdle, or Did It Make a Difference? Bonneville Participates in Regional Infrastructure Team EPA EIS Mapper Tool Online Tribal Training Key Reference Document on Climate Change Golden Field Office Relocates Golden FONSI Template EPA Ratings of DOE Draft EISs New Migratory Bird MOU Jim Daniel To Retire Transitions EAs and EISs Completed This Quarter Cost and Time Facts

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Defense programs occurrence analysis report for third quarter CY-1991  

Science Conference Proceedings (OSTI)

The quarterly Defense Programs Occurrence Analysis Report (DPOAR) is compiled by the Office of Self-Assessment and Emergency Management (DP-9). It utilizes the Occurrence Reporting and Processing System (ORPS) data to assess the quality and effectiveness of the reporting process and the significance of the occurrences. In addition, areas where further improvement and corrective actions are necessary is fully demonstrated by an analysis of the data. The results of the assessment may also be used as the basis for conducting other evaluations such as the diagnostic and augmented evaluations. This quarterly report provides feedback to DOE/DP and contractor management to improve the control of operations and achieve a higher standard of excellence. The report analyzes one year of ORPS data at the end of each calendar quarter, therefore, the performance of DP Field Offices and facilities will be continuously compared to their past quarter and yearly performances. During this assessment from 1 October 1990 through 30 September 1991, there were a number of initiatives that were undertaken by Field Office management to improve the overall performance and the quality of the Occurrence Reporting and Processing System. These initiatives include the training of their staff for self-assessment activities. These intiatives can be found in the programs implemented according to the DOE Conduct of Operations and Occurrence Reporting and Processing of Operations Information Orders. These initiatives were found to be, based on the ORPS data, stronger at Albuquerque, Nevada, Oak Ridge Field Offices and Richland DP facilities.

Not Available

1991-12-01T23:59:59.000Z

142

Strategic Petroleum Reserve. Quarterly report  

SciTech Connect

The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated. Samples of the oil revealed two problems that, although readily correctable, have reduced the availability of some of the oil inventory for drawdown in the near-term. These problems are: (1) a higher-than-normal gas content in some of the crude oil, apparently from years of intrusion of methane form the surrounding salt formation; and (2) elevated temperatures of some of the crude oil, due to geothermal heating, that has increased the vapor pressure of the oil. Investigations are proceeding to determine the extent to which gas intrusion and geothermal heating are impacting the availability of oil for drawdown. Preliminary designs have been developed for systems to mitigate both problems.

1993-11-15T23:59:59.000Z

143

NEPA Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEARNED LEARNED LESSONS N E P A Inside LESSONS LEARNED March 1, 1996 Quarterly Report LESSONS LEARNED National Environmental Policy Act U.S. Department of Energy Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPA- related information, and enhanced the format for better clarity and overall readability. This Quarterly Report includes: * NEPA lessons learned at the Hanford Site - Page 1 * Mini-guidance on the preparation of EIS summaries, properly eliminating alternatives and impacts from detailed analysis, application of DOE NEPA regulations to procurement, and NEPA questions and answers - Pages 3-6 * Updates on the proposed amendments to DOE's NEPA

144

Short-term energy outlook: Quarterly projections, second quarter 1997  

Science Conference Proceedings (OSTI)

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

NONE

1997-04-01T23:59:59.000Z

145

Short-term energy outlook. Quarterly projections, first quarter 1996  

DOE Green Energy (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

NONE

1996-02-01T23:59:59.000Z

146

Quarterly Coal Distribution Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Distribution Report Quarterly Coal Distribution Report Release Date: October 01, 2013 | Next Release Date: January 3, 2014 | full report The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of transportation, and consuming sector. Quarterly data for all years are preliminary and will be superseded by the release of the corresponding "Annual Coal Distribution Report." Highlights for the second quarter 2013: Total domestic coal distribution was an estimated 205.8 million short tons (mmst) in the second quarter 2013. This value is 0.7 mmst (i.e. 0.3 percent) higher than the previous quarter and 6.3 mmst (i.e. 3.1 percent) higher than the second quarter of 2012 estimates.

147

FTCP Quarterly Indicator Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assistance » Federal Technical Capability Program » Assistance » Federal Technical Capability Program » FTCP Quarterly Indicator Reports FTCP Quarterly Indicator Reports November 20, 2013 FTCP Quarterly Report on Federal Technical Capability, November 20, 2013 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls. August 16, 2013 FTCP Quarterly Report on Federal Technical Capability, August 16, 2013 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis.

148

Stockpile Stewardship Quarterly Newsletter | National Nuclear...  

National Nuclear Security Administration (NNSA)

Home > About Us > Our Programs > Defense Programs > Office of Research, Development, Test Capabilities and Evaluation > Stockpile Stewardship Quarterly Newsletter Stockpile...

149

Quarterly Financial Report | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

tax liability; designing economic policies and drafting legislation; making investment evaluations; and studying economic trends. Tags QFR, Quarterly, financial, report,...

150

Short-term energy outlook, quarterly projections, first quarter 1998  

Science Conference Proceedings (OSTI)

The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

NONE

1998-01-01T23:59:59.000Z

151

Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

Not Available

1993-11-05T23:59:59.000Z

152

Short-term energy outlook quarterly projections. First quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

Not Available

1994-02-07T23:59:59.000Z

153

Short-term energy outlook, Quarterly projections. Third quarter 1993  

Science Conference Proceedings (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

NONE

1993-08-04T23:59:59.000Z

154

Quarterly coal report, October--December 1996  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1996 and aggregated quarterly historical data for 1990 through the third quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 72 tabs.

NONE

1997-05-01T23:59:59.000Z

155

Strategic petroleum reserve. Quarterly report  

SciTech Connect

The Strategic Petroleum Reserve reduces the Nation`s vulnerability to oil supply disruptions. Its existence provides a formidable deterrent to the use of oil as a political instrument and an effective response mechanism should a disruption occur. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current and projected storage capacity, analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1995-08-15T23:59:59.000Z

156

Oil shale programs. Sixteenth quarterly report, October-December 1979  

SciTech Connect

This document is the sixteenth in a continuing series of quarterly reports, and describes the Sandia National Laboratories oil shale activities during the period between October 1, 1979 and December 31, 1979. Sandia's major responsibility to the DOE in situ oil shale program is to provide a quantitative evaluation to DOE of the various field projects being supported by DOE in the development of commercial in situ oil shale processes. This requires the deployment of instrumentation systems and analysis techniques to evaluate key procedures and operations. In order to fulfill this responsibility, it is necessary to develop new and advanced instrumentation systems and associated deployment, recording and analysis techniques that are unique to the field projects. In addition, a rock mechanics program provides material properties, material response models, and computational methods to support the design and evaluation functions. This report describes detailed activities in these project areas over the last quarter.

Stevens, A. L. [ed.

1980-06-01T23:59:59.000Z

157

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEPTEMBER 1998 1 SEPTEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT DOE NEPA Community to Meet in October For Third Quarter FY 1998 September 1, 1998, Issue No. 16 On October 14 and 15, 1998, the DOE NEPA Community will meet in North Las Vegas, hosted by the Nevada Operations Office at its new Support Facility. The Office of NEPA Policy and Assistance is sponsoring this meeting to improve DOE NEPA performance through sharing of lessons learned and discussion of current issues. Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process The meeting will focus on issues that NEPA Document Managers face daily: What tools and techniques can help

158

NEPA Lessions Learned Quarterly Report - 4th Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DECEMBER 1998 DECEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1998 December 1, 1998, Issue No. 17 New and Improved NEPA Compliance Guide Issued in 2 Volumes A new and improved DOE NEPA Compliance Guide, issued by the Office of Environment, Safety and Health, has been distributed to about 750 members of the DOE NEPA Community. Intended to foster sound and efficient NEPA compliance, the Compliance Guide is a collection of resources and references to aid in NEPA document preparation and other aspects of the NEPA process. Volume I, General NEPA References, contains the statute, and regulations and guidance from the Council on Environmental Quality, the Department of State, and the

159

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 1999 March 1, 1999; Issue No. 18 continued on page 3 Dr. David Michaels, new Assistant Secretary for Environment, Safety and Health, enthusiastically supports the Lessons Learned approach. Dr. David Michaels — DOE’s New Leader for Environment, Safety and Health The new Assistant Secretary for Environment, Safety and Health, Dr. David Michaels, recognizes the value of NEPA in supporting good decisions. “I understand the importance of examining options carefully before we make decisions that will affect our workers, the public, and the environment in lasting and profound ways,” he said. “We must be fully informed of the environmental

160

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1999 September 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 1999 September 1, 1999; Issue No. 20 Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis By: Ellen Russell, NEPA Document Manager, Fossil Energy with Carolyn Osborne, Office of NEPA Policy and Assistance continued on page 3 Fossil Energy (FE) is preparing an environmental impact statement (EIS) for what would be the first cross-border high-voltage transmission project to connect the main power delivery systems of the United States and Mexico (DOE/EIS-0307). EIS scoping has been complex. Through the scoping process, FE has identified and worked with many stakeholders to define a broad range

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NEPA Lessons Learned Quarterly Report - 1st Quarter FY2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2000 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 2000 March 1, 2000; Issue No. 22 Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources continued on page 4 By: Thomas W. Ferns, NEPA Document Manager, Richland Operations Office, and Yardena Mansoor, Office of NEPA Policy and Assistance A 50-year land-use plan for the Hanford Site? Some said it couldn't be done. Too many factions, they said, with irreconcilably different visions for the future. Would NEPA be a help or a hindrance in developing such a land-use plan? It turns out that the Hanford Comprehensive Land-Use Plan EIS Record of Decision (ROD) (64 FR 61615; November 12, 1999) marks the end of a successful, albeit

162

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1999 December 1999 1 continued on page 3 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1999 December 1, 1999; Issue No. 21 Good Information, Good Government Using Technology to Improve NEPA Decisionmaking provides a comprehensive guide to Federal environmental information resources available electronically and to useful Web sites provided by nongovernmental groups and professional organizations. “One of the foundations of good government is good information,” President Clinton observed. NEPA is “at its core, a mandate for informed, democratic decisionmaking. And its contribution to environmental protection is incalculable.” Managing a National Public Participation

163

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decisionmakers Decisionmakers States/Local Governm ents Agencies Academ icians Congress Framers of NEPA Drafters of CEQ Regs Native Am erican Tribes La wyers NGOs/ Citizen Groups Businesses Council on Environmental Quality NEPA Effectiveness Study Partners continued next page -- Improved Implementation Needed -- -- DOE Leadership Highlighted -- CEQ Study: NEPA a "Success" Overall National Environmental Policy Act N E P A U.S. Department of Energy Quarterly Report LESSONS LEARNED LESSONS LEARNED For First Quarter FY 1997 March 3, 1997 The President's Council on Environmental Quality (CEQ) issued in January the results of its extensive study on the effectiveness of the National Environmental Policy Act during the statute's 25-year history. From the cover letter by CEQ Chair Kathleen McGinty to its four short appendices, the 50-page booklet entitled The National Environmental

164

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1994  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LESSONS LEARNED QUARTERLY REPORT 4TH QUARTER FY1994 Oflicx of NEPA Oversight U.S. Department of Energy December ~ 1994 INTRODUCTION . To fdster continuing improvementof the Department's National Environmental policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEP& issued June 13, 1994, requires the OffIceof Environment StUetyand Health to soiicit comments tkom the NEPA Document Manager, the NEPA Compliance Offker, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the proces~ and to distribute a -Y SUmmW tOall NEpA Gmplf-c Offfcem and NEPA Document Managem On August Q 1994 the Oftice of NEPA Oversight distributed an interhddraft kSSOI.W ]WImed questionnaire to NEPA contacts to be used for reporting on environmental impact statements and environmental assessments approvedbetween

165

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1999 June 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 1999 June 1, 1999; Issue No. 19 continued on page 6 NEPA and Habitat Management Plan: Environmental Synergy By: Elizabeth Withers, NEPA Compliance Officer, Los Alamos Area Office, with John Stetson, Pacific Western Technologies, Ltd. On the day DOE issued the Draft EIS for the Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility at Los Alamos National Laboratory (LANL), LANL biologists discovered a nesting pair of Mexican spotted owls (Strix occidentalis lucida) – which had only recently been listed as threatened – in the canyons directly below the proposed site. Today, this nest site, at the edge

166

Great Plains Coal Gasification Project. Technical quarterly report, 1st quarter, 1984. [Great Plains, Mercer County, North Dakota  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet the Great Plains Coal Gasification project's full gas production date. Detailed engineering is complete for the gasification plant. The remaining engineering tasks, which include field support activities and special projects, will be performed by the Contractors' Field Engineering Group. A substantial amount of construction progress was achieved during the first quarter. It is currently projected that construction will be complete at the end of September, 1984. Start-Up operations are continuing at a rapid pace. Commissioning activities are proceeding very well. The only remaining plant permit is the Permit to Operate, which will be issued in late 1985. Quality Assurance/Quality Control activities included the development of welding procedures for Operations personnel, safety relief valve testing, and equipment turnover inspections. Mine development activities remain on schedule. Initial coal deliveries to GPGA commenced this quarter.

Not Available

1984-05-01T23:59:59.000Z

167

ASCeNews - Quarterly Newsletter  

National Nuclear Security Administration (NNSA)

December 2010 - NA-ASC-500-10 - Issue 15 December 2010 - NA-ASC-500-10 - Issue 15 1 ASCeNews - Quarterly Newsletter December 2010 - NA-ASC-500-10 - Issue 15 Meisner Minute I hope this quarter's newsletter finds you and your families looking forward to a healthy and prosperous new year. And, professionally, I hope your achievements in the New Year exceed those of a very successful 2010. In spite of presenting you with impediments such as continuing resolutions, your accomplishments are nothing short of amazing. So, I would like to take the time to recount your successes as a challenge for the New Year. This past year culminated several years of hard work on the Energy Balance knob. For the first time brilliant minds, unprecedented experimental facilities and world-leading simulation capabilities converged at a point in

168

Quarterly coal report, January--March 1994  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1994 and aggregated quarterly historical data for 1986 through the fourth quarter of 1993. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

Not Available

1994-08-24T23:59:59.000Z

169

Quarterly coal report, October--December 1997  

Science Conference Proceedings (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities. This report presents detailed quarterly data for october through December 1997 and aggregated quarterly historical data for 1991 through the third quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data, as specified in Section 202 of the energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

NONE

1998-05-01T23:59:59.000Z

170

Energy Statistics: Third Quarter, 1985  

Science Conference Proceedings (OSTI)

Third quarter energy statistics expand the coverage of gas prices from the wellhead to the end users by adding city gate gas prices. In addition to general energy production and consumption data, the report includes information on natural gas, gas liquids, oil, coal, peat, electricity, and uranium. A table of heating values and several tables summarizing US prices and business indicators complete the report. 87 tables.

Not Available

1985-01-01T23:59:59.000Z

171

Natural Gas Imports and Exports - Quarterly Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Imports and Natural Gas Imports and Exports - Quarterly Reports Natural Gas Imports and Exports - Quarterly Reports September 13, 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 July 1, 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 March 29, 2013 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 December 31, 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 September 28, 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012

172

BIO-ORGANIC CHEMISTRY QUARTERLY REPORT. June through August 1963  

E-Print Network (OSTI)

1. G. K. Radda, in Bio -Organic Chemistry Quarterly Report,1963. 2. G. K. Radda, in Bio-Organic Chemistry QuarterlyBassham and Martha Kirk, in Bio-Organic Chemistry Quarterly

Various

1963-01-01T23:59:59.000Z

173

BIO-ORGANIC CHEMISTRY QUARTERLY REPORT - MARCH THROUGH MAY 1961  

E-Print Network (OSTI)

H. Morimoto, and A. Orme, in Bio-Organic Chemistry Quarterly1949, 55. P. R. Hammond, in Bio-Organic Chemistry QuarterlyPhysiol. Edward Markham, in Bio-Organic Chemistry Quarterly

Various

2008-01-01T23:59:59.000Z

174

Program Update: 1st Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

175

Quarterly Coal Distribution Report - Energy Information ...  

U.S. Energy Information Administration (EIA)

The Quarterly Coal Distribution Report ... Electric Utilities and Independent Power Producers received approximately 92.2 percent of the total distrib ...

176

Quarterly Coal Report July - September 2011  

U.S. Energy Information Administration (EIA)

Release Date: December 2011 DOE/EIA-0121 (2011/03Q) Revised: July 2012. Quarterly Coal Report . July - September . 2011 . December 2011 . U.S. Energy Information ...

177

Quarterly Coal Report October - December 2011  

U.S. Energy Information Administration (EIA)

Release Date: March 2012 DOE/EIA-0121 (2011/04Q) Revised: July 2012. Quarterly Coal Report . October - December . 2011 . March 2012 . U.S. Energy Information ...

178

Program Update: 3rd Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

179

Stockpile Stewardship Quarterly Newsletter | National Nuclear...  

National Nuclear Security Administration (NNSA)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Stockpile Stewardship Quarterly Newsletter Home > About Us > Our...

180

Quarterly Coal Distribution Report January ? March 2013  

Annual Energy Outlook 2012 (EIA)

EIA's various monthly, quarterly, and annual surveys of the coal industry and electric power generation industry. The final report will rely on the receipt of annual data to...

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Quarterly Coal Distribution Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of ...

182

Quarterly Coal Report January - March 2003  

Gasoline and Diesel Fuel Update (EIA)

The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide...

183

Quarterly Coal Report April-June 2000  

Gasoline and Diesel Fuel Update (EIA)

The Quarterly Coal Report (QCR) provides compre- hensive information about U.S. coal production, dis- tribution, exports, imports, receipts, prices, consumption, and stocks to a...

184

Program Update: 2nd Quarter 2010  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

185

NEAMS Quarterly Report April-June 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes highlights,a spotlight on personal achievements, accomplishments, milestones and a technical spotlight on...

186

Program Update: 3rd Quarter 2009  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

187

Quarterly Coal Distribution Report - Energy Information ...  

U.S. Energy Information Administration (EIA)

The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of ...

188

Program Update: 2nd Quarter 2009  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

189

Quarterly Coal Report April - June 2011  

U.S. Energy Information Administration (EIA)

The Quarterly Coal Report (QCR) presents U.S. coal production, exports, imports, receipts, prices, consumption, coal quality, and stocks data.

190

Quarterly Coal Distribution Report October December 2012  

U.S. Energy Information Administration (EIA)

April 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report October December 2012

191

Lessons Learned Quarterly Report | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Lessons Learned Quarterly Report Lessons Learned Quarterly Report Lessons Learned Quarterly Report DOE's NEPA Lessons Learned Program was initiated in 1994 to foster continuous improvement in NEPA compliance by measuring DOE NEPA performance and gathering information learned through NEPA experience. The Program collects and publishes time and cost metrics to help DOE objectively focus on controlling these aspects of its NEPA compliance, and disseminates information broadly relevant to NEPA implementation, such guidance on public participation and interagency coordination procedures. The keystone of DOE's NEPA Lessons Learned Program is the Lessons Learned Quarterly Report (LLQR). The LLQR is produced as a means of disseminating NEPA program metrics, along with related guidance, case studies, analysis,

192

Post Competition Accountability Report: Second Quarter, FY 2013  

Energy.gov (U.S. Department of Energy (DOE))

Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 20122016: Reporting Period:Second Quarter, FY 2013

193

Third and Fourth Quarter Financial Guidance | National Nuclear...  

National Nuclear Security Administration (NNSA)

Quarter Financial Guidance Third and Fourth Quarter Financial Guidance OFFM FY 2010 Financial Statements, Performance Accountability Reporting Guidance (PDF, 64KB)...

194

Post Competition Accountability Report: First Quarter, FY2013  

Energy.gov (U.S. Department of Energy (DOE))

Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012 2016: Reporting Period: First Quarter, FY2013

195

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2000 Lessons Learned Quarterly Report, December 2000 Welcome to the 25th quarterly report on lessons learned in the NEPA process. September 1, 2000 Lessons Learned...

196

Post Competition Accountability Report: Third Quarter, FY 2013  

Energy.gov (U.S. Department of Energy (DOE))

Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 20122016: Reporting Period: Third Quarter, FY 2013

197

2013 Second Quarter Clean Energy/Clean Transportation Jobs Report...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Second Quarter Clean EnergyClean Transportation Jobs Report 2013 Second Quarter Clean EnergyClean Transportation Jobs Report Enivronmental Entrepreneurs (E2) Clean Energy...

198

Lessons Learned Quarterly Report Archive | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Lessons Learned September 6, 2013 Lessons Learned Quarterly Report, September 2013 Welcome to the 76th quarterly report on lessons learned in the NEPA process. This issue...

199

Fossil Energy Today - Second Quarter, 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter, 2011 Fossil Energy Today - Second Quarter, 2011 Topics In This Issue... Office Reorganization McConnell Joins FE Staff Coal Cleaning Commercial Success Sonar Survey...

200

Energy Emergency Preparedness Quarterly Vol 2, Issue 3 - July...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - July 2013 Energy Emergency Preparedness Quarterly Vol 2, Issue 3 - July 2013 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and Energy...

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Energy Emergency Preparedness Quarterly Vol 1, Issue 2 - April...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 - April 2012 Energy Emergency Preparedness Quarterly Vol 1, Issue 2 - April 2012 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and...

202

Energy Emergency Preparedness Quarterly Vol 2, Issue 2 - April...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 - April 2013 Energy Emergency Preparedness Quarterly Vol 2, Issue 2 - April 2013 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and...

203

Energy Emergency Preparedness Quarterly Vol 1, Issue 1 - January...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 - January 2012 Energy Emergency Preparedness Quarterly Vol 1, Issue 1 - January 2012 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and...

204

Energy Emergency Preparedness Quarterly Vol 1, Issue 3 - July...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - July 2012 Energy Emergency Preparedness Quarterly Vol 1, Issue 3 - July 2012 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and Energy...

205

Energy Emergency Preparedness Quarterly Vol 2, Issue 4 - October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 - October 2013 Energy Emergency Preparedness Quarterly Vol 2, Issue 4 - October 2013 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and...

206

Energy Emergency Preparedness Quarterly Vol 2, Issue 1 - January...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Issue 1 - January 2013 Energy Emergency Preparedness Quarterly Vol 2, Issue 1 - January 2013 The Energy Emergency Preparedness Quarterly is published by the Infrastructure...

207

Energy Emergency Preparedness Quarterly Vol 1, Issue 4 - October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, Issue 4 - October 2012 Energy Emergency Preparedness Quarterly Vol 1, Issue 4 - October 2012 The Energy Emergency Preparedness Quarterly is published by the Infrastructure...

208

Lessons Learned Quarterly Report, June 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2006 June 2006 Lessons Learned Quarterly Report, June 2006 Welcome to the 47th quarterly report on lessons learned in the NEPA process. The quality of our NEPA process affects the quality of DOE's decisions. Our appreciation goes out to all the NCOs and NEPA Document Managers who work every day to build quality into NEPA documents. As always, we welcome your suggestions for continuous improvement. Articles included in this issue include: Quality + Leadership = NEPA Success Security Reviews Needed for EISs on DOE NEPA Website NAEP Presents Award for NEPA 35 Conference FedCenter Website CRS Report on NEPA Streamlining Global Nuclear Energy Partnership EIS Sites Proposed for FutureGen Project Hanford EIS Scoping 2006 NAEP Conference Renewed Emphasis on EMS DOE Headquarters, Field Sites Celebrate Earth Day

209

Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Success Stories: Success Stories: Articles from Department of Energy NEPA Lessons Learned Quarterly Reports 1996 Mar Hanford Tanks Public participation in NEPA process resulted in changes to the scope of the proposed project. The NEPA process resulted in enforceable mitigation commitments. 1997 Dec NPR Sale The NEPA process resulted in enforceable mitigation commitments for biological and cultural resources. 1999 Mar SPR Pipeline Integrating NEPA and the Section 404 permit processes proved efficient and resulted in mitigation commitments. 1999 Jun LANL Habitat Plan The NEPA process resulted in a site-wide habitat management plan (reducing future need for biological assessments), geographic information system (reference for future project analyses), and endangered species protection.

210

Short-term energy outlook. Quarterly projections, Third quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

1994-08-02T23:59:59.000Z

211

Short-term energy outlook, quarterly projections, second quarter 1998  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

NONE

1998-04-01T23:59:59.000Z

212

NEPA Lessons Learned Quarterly Report. December 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 More Inside on NEPA 35 CEQ Chairman Connaughton's Address ......... 5 Plenary Sessions.............................................. 6 Training Sessions .......................................... 14 Breakout Sessions ......................................... 15 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2005 December 5, 2005; Issue No. 45

213

RENEWABLE ENERGY PROGRAM QUARTERLY REPORT TO THE  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION RENEWABLE ENERGY PROGRAM QUARTERLY REPORT TO THE LEGISLATURE January #12;1 California Energy Commission's Quarterly Report Regarding the Renewable Energy Program (January to the Legislature on the Renewable Energy Program, covering the period January 1 to March 31, 2002. The Energy

214

Domestic Uranium Production Report - Quarterly - Energy Information  

U.S. Energy Information Administration (EIA) Indexed Site

All Nuclear Reports All Nuclear Reports Domestic Uranium Production Report - Quarterly Data for 3rd Quarter 2013 | Release Date: October 31, 2013 | Next Release Date: February 2014 | full report Previous Issues Year: 2013-Q2 2013-Q1 2012-Q4 2012-Q3 2012-Q2 2012-Q1 2011-Q4 2011-Q3 2011-Q2 2011-Q1 2010-Q4 2010-Q3 2010-Q2 2010-Q1 2009-Q4 2009-Q3 2009-Q2 2009-Q1 2008-Q4 2008-Q3 2008-Q2 2008-Q1 Go 3rd Quarter 2013 U.S. production of uranium concentrate in the third quarter 2013 was 1,171,278 pounds U3O8, down 16 percent from the previous quarter and up 12 percent from the third quarter 2012. Third quarter 2013 uranium production is at its highest level since 1999. During the third quarter 2013, U.S. uranium was produced at six U.S. uranium facilities. U.S. Uranium Mill in Production (State)

215

The China Quarterly http://journals.cambridge.org/CQY  

E-Print Network (OSTI)

The China Quarterly http://journals.cambridge.org/CQY Additional services for The China Quarterly here Lowincome Housing in Chinese Cities: Policies and Practices Youqin Huang The China Quarterly (2012). Lowincome Housing in Chinese Cities: Policies and Practices. The China Quarterly, 212, pp

Huang, Youqin

216

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2001 June 1, 2001 Lessons Learned Quarterly Report, June 2001 Welcome to the 27th quarterly report on lessons learned in the NEPA process. March 1, 2001 Lessons Learned Quarterly Report, March 2001 Welcome to the 26th quarterly report on lessons learned in the NEPA process. December 1, 2000 Lessons Learned Quarterly Report, December 2000 Welcome to the 25th quarterly report on lessons learned in the NEPA process. September 1, 2000 Lessons Learned Quarterly Report, September 2000 Welcome to the 24th quarterly report on lessons learned in the NEPA process. Note that this issue includes a cumulative index covering the past six years of reports. June 1, 2000 Lessons Learned Quarterly Report, June 2000 Welcome to the 23rd quarterly report on lessons learned in theNEPA process.

217

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1997 December 1997 1 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED For Fourth Quarter FY 1997 December 1, 1997, Issue No. 13 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT continued on page 2 I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£W W W W Whyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r The endangered San Joaquin Kit Fox would continue to be protected after sale of NPR-1. (Photo courtesy of

218

Strategic Petroleum Reserve: Annual/quarterly report  

SciTech Connect

Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

1994-02-16T23:59:59.000Z

219

U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 1st Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 807 158 282 - 1,247 Alabama Railroad 449 71 14 - 534 Alabama River 358 - - - 358 Alabama Truck - 87 267 - 354 Colorado Total 204 - - - 204 Colorado Railroad

220

NEPA Lessons Learned Quarterly Report, First Quarter FY 2005 (March 1, 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 Green Book, Second Edition, Issued; see page 4 New Assistant Secretary Shaw Promotes NEPA as Essential to Energy Mission and Goals National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2005 March 1, 2005; Issue No. 42 LESSONS LEARNED LEARNED LESSONS (continued on page 3) In a recent interview for Lessons Learned Quarterly Report, John Spitaleri Shaw, the new Assistant Secretary for

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Clean Cities and Alternative Fuels Data Center Quarterly Report: 1st Quarter FY 2006 (Milestone Report)  

DOE Green Energy (OSTI)

This quarterly report summarizes activities in Clean Cities and the Alternative Fuels Data Center. Find metrics on NREL activities and lists of new information in the AFDC.

Brodt-Giles, D.

2006-03-01T23:59:59.000Z

222

dgw_cmod_quarterly.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

C-Mod Quarterly Oct 2010 FY2010 Plain English Milestone Accomplished Fuel retention in refractory metals * Tritium fuel retention is an important issue for ITER and reactors, since the on- site inventory of tritium is restricted by safety considerations. * In addition, the high neutron fluence environment of a reactor necessitates the use of tungsten as the first-wall tile material. * Initial experiments have revealed a higher-than-expected level of fuel retention in C-Mod's molybdenum and tungsten tiles compared to laboratory studies. It has been proposed that when such tiles are exposed to C-Mod's high plasma particle fluxes, they experience damage deep within the material, forming 'traps' that can enhance fuel retention. * Experiments will be performed to quantify the level of fuel retention in C-

223

Quarterly Report 09-01  

NLE Websites -- All DOE Office Websites (Extended Search)

Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Phone: 909-469-0315 Ÿ FAX: 909-469-0319 Ÿ Juan.Argueta@sce.com Demonstration and Evaluation of U.S. Postal Service Electric Carrier Route Vehicles Quarterly Report, September 2001 AQMD CONTRACT #00192 Project Number: TC-00-0101 Report Number: TC-00-0101-TR05 Electric Vehicle Technical Center An ISO 9001 Certified Facility Prepared by: Michel Wehrey Juan C. Argueta Fabian Sanchez Julie M. Phung Southern California Edison September 26, 2001 Page i DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES This report was prepared by the Electric Transportation Division of Southern California Edison, a subsidiary of Edison International. Neither the Electric Transportation Division of Southern California Edison, Southern

224

Strategic petroleum reserve, quarterly report  

SciTech Connect

As of December 31, 1981, the cumulative fill capability for the storage of crude oil for the SPR was 257 million barrels. Development of Phase I of the program consisting of 250 million barrels of capacity is complete and development of Phase II, consisting of 290 million barrels of capacity, is continuing. During 1981, the design of Phase III commenced. Phase III will increase the SPR capacity by 210 million barrels. The cumulative fill capability is expected to be 750 million barrels by 1990. The SPR was filled at a rate of 338,391 barrels per day during the last quarter of 1981, and had a total of 230.3 million barrels of oil in storage at the end of 1981. The Department of Energy has aggressively pursued oil purchases during 1981 in order to take advantage of the favorable international oil market. A long-term commercial contract was signed on August 20, 1981, with Petroleos Mexicanos (PEMEX), Mexico's state-owned oil company, for purchase of 110 million barrels of crude oil through 1986. The contract provided for the SPR to purchase 24 million barrels between September 1, 1981, and December 31, 1981. Thereafter PEMEX will supply crude oil to the SPR at the rate of 50,000 barrels a day through August 31, 1986. In addition, under the terms of a settlement of an overcharge allegation, Chevron USA agreed to supply 1,029,000 barrels of oil to the Reserve without cost. Deliveries under this settlement were completed in January 1982. The Omnibus Budget Reconciliation Act also requires the Secretary of the Treasury to establish an account to be known as the SPR Petroleum Account which may be obligated for the acquisition, transportation, and injection of petroleum products into the SPR. For FY 1982, Congress appropriated $3.7 billion to this account. The amount of funds obligated from the SPR Petroleum Account during the first quarter FY 1982 ending December 31, 1981, was $2056 million.

Not Available

1982-02-16T23:59:59.000Z

225

Microsoft Word - Quarterly Report 4- DOE Hydrates.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

10195 10195 Quarterly Research Performance Progress Report (Period ending 8/31/2013) Methane Hydrate Field Program Project Period (October 1, 2012 - December 31, 2013) Submitted by: Greg Myers - Principal Investigator _________________________ Signature Consortium for Ocean Leadership DUNS #:046862582 1201 New York Avenue, NW Fourth Floor e-mail: gmyers@oceanleadership.org Phone number: (202) 448-1258 Prepared for: United States Department of Energy National Energy Technology Laboratory October 31, 2013 Office of Fossil Energy 2 ACCOMPLISHMENTS: The primary objective of the project is to conduct scientific planning that will help enable future scientific ocean drilling, coring, logging, testing and analytical activities to assess the geologic occurrence, regional

226

quarterly meeting | OpenEI Community  

Open Energy Info (EERE)

24 24 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234924 Varnish cache server quarterly meeting Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand

227

Bio-Organic Chemistry Quarterly Report  

E-Print Network (OSTI)

I). Johannes Ull~.ich, in Bio-Organic Chc! mistry Qiinrtcr-sodium E. A. Shneour, in Bio-Organic Chemistry Quarterly2, Edwige Tyszkiewicz, in Bio-Organic Chemistry Qnarterly

Various

1961-01-01T23:59:59.000Z

228

Quarterly Coal Report, April-June 1998  

Annual Energy Outlook 2012 (EIA)

2Q) Distribution Category UC-950 Quarterly Coal Report April-June 1998 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of...

229

Quarterly Coal Report, April-June 1997  

Gasoline and Diesel Fuel Update (EIA)

2Q) Distribution Category UC-950 Quarterly Coal Report April-June 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of...

230

The Savannah River Site's Groundwater Monitoring Program - Second Quarter 1998 (April through June 1998)  

Science Conference Proceedings (OSTI)

This report summarizes the Groundwater Monitoring Program conducted by SRS during second quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for the program; provides a record of the program's activities; and serves as an official record of the analytical results.

Hutchison, J B

1999-02-10T23:59:59.000Z

231

NEPA Lessons Learned Third Quarter 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2007 1 Third Quarter FY 2007 September 4, 2007; Issue No. 52 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 4) The U.S. Department of Energy (DOE) has announced its plan to evaluate eight DOE sites and two generic locations for the proposed disposal of about 5,600 cubic meters

232

NEPA Lessons Learned Second Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 (continued on page 4) Second Quarter FY 2006 June 1, 2006; Issue No. 47 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A Quality + Leadership = NEPA Success NEPA 35 Earns Special Award from NAEP; see page 3 DOE's NEPA Compliance Offi cers discussed quality assurance during the interactive meeting of more than

233

Liquid fossil-fuel technology. Quarterly technical progress report, January-March 1983  

DOE Green Energy (OSTI)

Accomplishments for the quarter ending March 1983 are presented under the following headings: liquid fossil fuel cycle, processing, utilization, and project integration and technology transfer. Feature articles for this quarter are: (1) abandoned oil field reports issued; (2) oilfield water data bank report published; (3) microbial enhanced recovery report issued; (4) polymer-augmented project could be economic today; (5) carbon dioxide EOR estimates given; (6) BETC passes 65th milestone; and (7) fifty achievements for fifty years (1918-1968). BETC publications are also listed. (ATT)

Linville, B. (ed.)

1983-07-01T23:59:59.000Z

234

K-Area and Par Pond Sewage Sludge Application Sites groundwater monitoring report: Second quarter 1993  

Science Conference Proceedings (OSTI)

During second quarter 1993, samples from the three monitoring wells at the K-Area site (KSS series) and the three monitoring wells at the Par Pond site (PSS series) were analyzed for constituents required by South Carolina Department of Health and Environmental Control Construction Permit 13,173 and for other constituents as part of the Savannah River Site (SRS) Groundwater Monitoring Program. This report describes monitoring results that exceeded the final Primary Drinking Water Standards (PDWS) or the SRS flagging criteria. During second quarter 1993, no constituents exceeded the final PDWS or any other flagging criteria at the K-Area and Par Pond Sewage Sludge Application Sites. During first quarter 1993, aluminum and iron exceeded the SRS Flag 2 criteria in one or more of the KSS and the PSS wells. These constituents were not analyzed second quarter 1993. In the KSS well series, the field measurement for alkalinity ranged as high as 35 mg/L in well KSS 1D. Alkalinity measurements were zero in the PSS wells, except for a single measurement of 1 mg/L in well PSS 1D. Historical and current water-level elevations at the K-Area Sewage Sludge Application Site indicate that the groundwater flow direction is south to southwest (SRS grid coordinates). The groundwater flow direction at the Par Pond Sewage Sludge Application Site could not be determined second quarter 1993.

Not Available

1993-10-01T23:59:59.000Z

235

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2009 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

236

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012

237

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

238

Environmental Compliance Performance Scorecard - Second Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

239

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2011 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010

240

Quarterly environmental, safety, and medical report: Second quarter, 1988  

SciTech Connect

ANG continued permitting activity during the reporting period. These activities include finalizing the revised RCRA Part B permit application; participating in the NDPDES QA/QC program; performing the required integrity tests on the deepwells; initiating a hydrogeologic assessment for the plant site; completing the DOE assigned sections for the modified permit to Construct/Operate application; preparing for the main stack CEM monitor certification test; completing the particle size distribution work on ''Donna'' coal lock vent; responding to NDSDH concerns about odor complaint followup surveys and lead in the drinking water supply; submitting a renewal application for the construction waste landfill; and requesting approval to dispose of spent shift catalyst in the gasifier ash pit. ANG conducted eight monitoring programs in the vicinity of the Great Plains facility. Major activities for these ambient monitoring programs are subsequently summarized. The RAMP network consists of five monitoring sites, and it is designed to monitor meteorology and air quality in the vicinity of the Great Plains facility and the Antelope Valley and Coyote electric generating stations. There was one exceedence of the air quality standards for TSP during the reporting period. ANG conducts ambient monitoring for H/sub 2/S at one site in the vicinity of the Great Plains facility. ANG conducts additional ambient monitoring for SO/sub 2/ at two (2) sites in order to ensure that ambient air quality standards are not violated during periods when H/sub 2/S- bearing wastes gases are incinerated in the event of temporary SRU shutdown. ANG conducts groundwater monitoring programs on a quarterly basis that are associated with desulfurization-gasifier ash waste disposal, deepwell injection, gasifier ash disposal, and the surge ponds. Major activities on each program are summarized.

1988-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

2nd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

nd Quarter 2013 Domestic Uranium Production Report 2nd Quarter 2013 Domestic Uranium Production Report Release Date: August 7, 2013 Next Release Date: November 2013 0 500,000...

242

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance...

243

Prices Show No Tendency to Decrease Second Quarter  

Gasoline and Diesel Fuel Update (EIA)

data show no tendency toward a second quarter decline. The table illustrates that prices move up in the second quarter more often than they move down. Since the Gulf War,...

244

Great Plains Coal Gasification Project, Mercer County, North Dakota. Quarterly technical and environmental report, fourth quarter, 1983. [Great Plains, Mercer County, North Dakota  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet Great Plains Gasification Associates' full gas production date. Gasification Plant: detailed engineering in the Contractors' home office was completed in the fourth quarter. The remaining engineering tasks, which include field support activities and special projects, will be performed by the Contractors' Field Engineering Group. A substantial amount of construction progress was achieved during the fourth quarter. Although the Plant's construction activities are still slightly behind schedule, it is currently forecasted that the construction schedule will be regained by the end of June 1984. Start-Up operations are continuing at a rapid pace. The current emphasis is on system turnover and commissioning activities. The environmental permitting for the construction phase is complete. Freedom Mine: mine development activities remain on schedule.

Not Available

1983-01-01T23:59:59.000Z

245

Quarterly Coal Report: January-March 2002  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January - March 2002 August 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr_sum.html _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report January - March 2002 ii Contacts

246

Quarterly Coal Report: October-December 2001  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October - December 2001 May 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report October - December 2001 iii Contacts

247

Quarterly Coal Report April-June 2002  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2002 September 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report April - June 2002 ii Contacts This publication was prepared by

248

Natural gas imports and exports. Second quarter report  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1997 (April through June).

NONE

1997-12-31T23:59:59.000Z

249

The China Quarterly http://journals.cambridge.org/CQY  

E-Print Network (OSTI)

The China Quarterly http://journals.cambridge.org/CQY Additional services for The China Quarterly and Boston: Brill, 2012. vii + 394 pp., 133.00 $182.00. ISBN 9789004218444 Benjamin A. Elman The China this article: Benjamin A. Elman (2012). The China Quarterly, 212, pp 11451148 doi:10.1017/ S0305741012001440

Elman, Benjamin

250

U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 4th Quarter 2012 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,226 162 274 - 1,662 Alabama Railroad 803 17 22 - 842 Alabama River 384 - - - 384 Alabama Truck 39 144 252 - 436 Georgia Total s - - - s Georgia Truck s - - - s Indiana Total

251

U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2013  

Gasoline and Diesel Fuel Update (EIA)

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 3rd Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,198 151 353 - 1,702 Alabama Railroad 796 26 20 - 842 Alabama River 307 - 3 - 310 Alabama Truck 96 125 330 - 551 Georgia Total - - 3 - 3 Georgia Truck - - 3 - 3 Indiana Total

252

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic coal distribution, by origin State, 2nd Quarter 2012 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,714 158 238 - 2,110 Alabama Railroad 1,056 12 45 - 1,113 Alabama River 464 - - - 464 Alabama Truck 194 146 193 - 532 Georgia Total s - - - s Georgia Truck s - - - s

253

U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2012 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic coal distribution, by destination State, 3rd Quarter 2012 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,837 167 196 - 2,200 Alabama Railroad 1,051 25 10 - 1,087 Alabama River 730 - - - 730 Alabama Truck 56 141 186 - 384 Colorado Total 456 - 16 - 472

254

U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 4th Quarter 2012 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,226 162 274 - 1,662 Alabama Railroad 803 17 22 - 842 Alabama River 384 - - - 384 Alabama Truck 39 144 252 - 436 Colorado Total 301 - 25 - 326 Colorado

255

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 2nd Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,066 210 301 - 1,577 Alabama Railroad 495 116 26 - 638 Alabama River 512 - 2 - 513 Alabama Truck 59 94 273 - 426 Georgia Total - - 2 - 2 Georgia Truck - - 2 - 2 Indiana Total

256

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic coal distribution, by destination State, 2nd Quarter 2012 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,714 158 238 - 2,110 Alabama Railroad 1,056 12 45 - 1,113 Alabama River 464 - - - 464 Alabama Truck 194 146 193 - 532 Colorado Total 275 - - - 275

257

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 2nd Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,066 210 301 - 1,577 Alabama Railroad 495 116 26 - 638 Alabama River 512 - 2 - 513 Alabama Truck 59 94 273 - 426 Colorado Total 97 - - - 97 Colorado

258

U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 1st Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 807 158 282 - 1,247 Alabama Railroad 449 71 14 - 534 Alabama River 358 - - - 358 Alabama Truck - 87 267 - 354 Indiana Total - 164 - - 164 Indiana Railroad - 164 - - 164

259

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

260

Quarterly Coal Report October - December 2003  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Quarterly Coal Report October - December 2003 March 2004 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Quarterly Coal Report - July - September 2004  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2004 December 2004 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

262

Quarterly Coal Report April … June 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Independent Statistics & Analysis Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Report April - June 2013 October 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. iii U.S. Energy Information Administration | Quarterly Coal Report April - June 2013

263

Quarterly Coal Report April - September 2003  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2003 December 2003 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

264

Quarterly Coal Report January - March 2004  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2004 September 2004 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

265

Quarterly Coal Report Julyl-September 2002  

Gasoline and Diesel Fuel Update (EIA)

2/03Q) 2/03Q) Quarterly Coal Report July - September 2002 September 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr_sum.html _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

266

Quarterly Coal Report April - June 2003  

Gasoline and Diesel Fuel Update (EIA)

3/02Q) 3/02Q) Quarterly Coal Report April - June 2003 October 2003 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

267

NEPA Lessons Learned Quarterly Report (03/01), Issue No. 26  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2001 March 2001 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 2001 March 1, 2001; Issue No. 26 continued on page 3 By: Paul Bayer, NEPA Document Manager, and Clarence Hickey, NEPA Compliance Officer, Office of Science Innovative Field Research Benefits from NEPA Review The high costs and long times frequently needed to clean up contaminated Department of Energy (DOE) sites have created a demand for better and cheaper cleanup technologies. A promising new method for cleaning up subsurface contamination is bioremediation. However, field experience to validate laboratory results is lacking. Preparing an environmental assessment (EA) helped DOE's Office of Science plan an effective field-based

268

Environmental Compliance Performance Scorecard - Third Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Third Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011

269

Environmental Compliance Performance Scorecard - First Quarter FY2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Environmental Compliance Performance Scorecard - First Quarter FY2013 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2013 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2010

270

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2012

271

Environmental Compliance Performance Scorecard - Third Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Third Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

272

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2010

273

Environmental Compliance Performance Scorecard - Second Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Second Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009

274

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010 Environmental Compliance Performance Scorecard - First Quarter FY2011

275

Environmental Compliance Performance Scorecard - Third Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Third Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

276

Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

277

NEPA Lessons Learned Quarterly Report, March 3, 2008; Issue No. 54; First Quarter FY 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 1 08 1 First Quarter FY 2008 March 3, 2008; Issue No. 54 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 3) Programmatic EIS on Nuclear Weapons Complex Draws National Interest, Many Comments Dinah Bear, General Counsel Council on Environmental Quality Anne Norton Miller, Director Offi ce of Federal Activities

278

NEPA Lessons Learned Quarterly Report, June 1, 2005; Issue No. 43; Second Quarter FY 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Second Quarter FY 2005 June 1, 2005; Issue No. 43 LESSONS LEARNED LEARNED LESSONS (continued on page 4) Who Has More Than 500 Years of NEPA Experience? A Closer Look at the DOE NEPA Compliance Officers Who are these 47 individuals? What inspires their commitment to the environment? How do they carry out

279

NEPA Lessons Learned Quarterly Report, Issue No. 41; Fourth Quarter FY 2004; December 1, 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 1 4 1 The EIS Comment-Response Process Guidance Issued; see page 9 Putting the Web to Work for NEPA National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2004 December 1, 2004; Issue No. 41 LESSONS LEARNED LEARNED LESSONS (continued on page 4) "What's your e-mail address? Do you have a Web site?" These are common questions in

280

Lessons Learned Quarterly Report, December 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 1999 Lessons Learned Quarterly Report, December 1999 Lessons Learned Quarterly Report, December 1999 Welcome to the 21st Quarterly Report on lessons learned in the NEPA process. This report includes: Good Information, Good Government; CEQ 1997 Report to Congress on Environmental Quality" Managing a National Public Participation Program for the Yucca Mountain EIS New Executive Order on Trade Agreements NEPA Challenges for Western Area Power Administration Is CD-ROM a Useful Complement to Paper Documents? Pollution Prevention and NEPA Clean Air Act Conformity and NEPA National Natural Landmark Considerations Include Distribution List in EIS Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, June 2002 Lessons Learned Quarterly Report, September 2002

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Lessons Learned Quarterly Report, March 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1999 March 1999 Lessons Learned Quarterly Report, March 1999 Welcome to the first quarter FY 1999 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: Dr. David Michaels DOEs New Leader for Environment, Safety and Health Society Promotes Lessons Learned Exchange at DOE Partnering Facilitates SPR Pipeline EA Mini-guidance An EIS Needs an Index When We Dont Know, Say So Extending Public Comment Periods Advisory Council on Historic Preservation to Issue New Section 106 Regulations DOE -wide NEPA Contracts Litigation Updates Executive Order Issued on Invasive Species Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, December 1998 Lessons Learned Quarterly Report, June 1999 Lessons Learned Quarterly Report, June 2002

282

NEAMS Quarterly Report April-June 2013  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes highlights, fuel and reactor product line accomplishments, recent and upcoming milestones, news on BISON fuel benchmarks, the latest MeshKit release features, and information on numerical simulations of pebble-bed reactor cores performed by the thermal hydraulics team.

283

Great Plains Gasification Associates. Quarterly technical and environmental report, Great Plains coal gasification project, Mercer County, North Dakota, second quarter, 1983  

Science Conference Proceedings (OSTI)

Activities remain on schedule to meet Great Plains Gasification Associate's start-up and coal delivery dates as well as the completion of the pipeline. Home Office engineering is essentially complete for the Plant. The remaining engineering tasks will involve field support activities and special projects. A substantial amount of construction progress was achieved during the second quarter. Although construction is still slightly behind schedule for the Plant, it is currently forecasted that construction will be back on schedule by the end of October, 1983. Start-up activities are continuing at a rapid pace. The current emphasis is on precommissioning planning and the development and implementation of the computer systems required to run the plant. Mine development activities remain on schedule. Almost all of the environmental permitting for the construction phase is complete. Engineering for the pipeline is complete. Construction started this quarter and should be completed by August 15, 1983.

Not Available

1983-01-01T23:59:59.000Z

284

Environmental Biosciences Program Quarterly Report  

SciTech Connect

Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River Site (SRS). This project will be incorporated into the ongoing project on Population Health Risks in the Vicinity of the Savannah River Site. During a meeting at the SRS on October 21, 2008, a presentation was made on EBP participation in the development and operation of an Epidemiology Consortium at the SRS. A follow-up meeting with SRS officials is planned for 29 and 30 January 2009 at Medical University of South Carolina (MUSC).An epidemiology project on population health risk assessment is being conducted to assess health risks among populations in the vicinity of the SRS. This project is using the capabilities of the EBP GIS for the geographical assessment of cancer and non-cancer disease rates, as well as the potential association of population health risks with environmental exposures. Although funding uncertainties have slowed progress on some aspects of this project, it has not been necessary to restructure the performance schedule to date.

Lawrence C. Mohr, M.D.

2009-01-30T23:59:59.000Z

285

Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April- June 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

651 651 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April-June 2005 TECHNICAL REPORT Larry Zirker James Francfort Jordan Fielding September 2005 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-05-00651 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April-June 2005 Larry Zirker James Francfort Jordan Fielding September 2005 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

286

Quarterly Health Physics Report. Through June 30, 1959  

SciTech Connect

A resume of Health Physics activities for April, May, and June, 1959 is presented. Discussions and tabulations which summarize results of field surveys, biooassy, personnel monitoring, and environmental surveys are included. The thorium redrumming program reactivated for the summer. Work is in progress to move th "HH" Building process to the "T" Building. The ventilation system for the Hot Gas Facility was extended to handle the ventilation requirements for tthe R-108 Surveillance facility. "Hot" work in R-108 began in June. During this quarter "hot" work was initiated in the new Plutonium Alloy Research facility. Health Physics design criteria for the proposed Clover facility has been submitted to the Engineeering Department. The installation of the air monitoring systems in the new Cryogenics facility and iin the new Ceramics facility is essentially complete. We have embarked on the program of converting all of our personnel monitoring and survey record keeping systems to the IBM system.

Meyer, H.E.

1959-08-18T23:59:59.000Z

287

US energy industry financial developments, 1993 third quarter  

SciTech Connect

Based on information provided in 1993 third quarter financial disclosures, the average net income for 112 petroleum companies -- including 18 majors -- rose 13 percent between the third quarter of 1992 and the third quarter of 1993. The gain in overall petroleum income was derived from increases in refined product consumption and margins, which improved the profitability of downstream petroleum (refining, marketing and transport) operations. A 17-percent decline in crude oil prices led to reduced income for upstream (oil and gas exploration, development and production) operations. A 16-percent rise in natural gas wellhead prices only partially offset the negative effects of low crude oil prices. Electric utilities also reported improved financial results for the third quarter of 1993 as hotter summer temperatures relative to the year-earlier quarter helped boost air conditioning demand and overall electricity usage. The following points highlight third-quarter energy industry financial developments: (1) Refined product demand and margins lift downstream earnings. Petroleum product consumption rose 2 percent between the third quarter of 1992 and the third quarter of 1993. Although petroleum product prices declined in the most recent reporting period, they did not decline as much as crude oil input prices. As a consequence, refined product margins widened. (2) Lower crude oil prices reduce upstream earnings. Crude oil prices fell 17 percent between the third quarter of 1992 and the third quarter of 1993 leading to a substantial reduction in income for the major petroleum companies` upstream operations. (3) Drilling income rises with increased North American exploratory activity.

Not Available

1993-12-01T23:59:59.000Z

288

Liquid fossil fuel technology. Quarterly technical progress rport, April-June 1983  

Science Conference Proceedings (OSTI)

Highlights of research activities for the quarter ending June 1983 are summarized under the following headings: liquid fossil fuel; extraction; processing; utilization; and project integration and technology transfer. BETC publications are listed. Titles of featured articles are: (1) chemical flooding field test produces 975,000 barrels of oil; (2) chemicals boost recovery in steam-drive tests; (3) North Dakota carbon dioxide minitest successful; (4) carbon dioxide EOR reports issued; and (5) BETC slated for new management and new name. (ATT)

Linville, B. (ed.)

1983-10-01T23:59:59.000Z

289

The Savannah River Site`s Groundwater Monitoring Program: First quarter 1993, Volume 1  

Science Conference Proceedings (OSTI)

This report summarizes the Savannah River Site (SRS) Groundwater Monitoring Program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the first quarter of 1993. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1993-08-01T23:59:59.000Z

290

Geothermal direct-heat utilization assistance. Federal Assistance Program, Quarterly project progress report, October--December 1994  

DOE Green Energy (OSTI)

The report summarizes activities of the Geo-Heat Center (GHC) at Oregon Institute of Technology for the first quarter of Fiscal Year 1995. It describes contacts with parties during this period related to assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research is also being conducted on geothermal energy cost evaluation, low-temperature geothermal resource assessment, use of silica waste from the Cerro Prieto geothermal field as construction materials and geothermal heat pumps. Outreach activities include the publication of a quarterly Bulletin on direct heat applications and dissemination of information on low-temperature geothermal resources and utilization.

Not Available

1994-12-31T23:59:59.000Z

291

NEPA Lessons Learned Quarterly Report June 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 2001 June 1, 2001; Issue No. 27 continued on page 3 The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, on the theme of “NEPA: What’s New, What’s Next.” Horst Greczmiel, CEQ’s Associate Director for NEPA Oversight, and Anne Miller, Acting Director of the EPA’s Office of Federal

292

NEPA Lessons Learned Quarterly Report December 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 2000 December 1, 2000; Issue No. 25 DOE NEPA Order Revised, National Nuclear Security Administration Responsibilities Outlined On October 26, 2000, the Deputy Secretary of Energy issued DOE O 451.1B, National Environmental Policy Act Compliance Program, to accommodate National Nuclear Security Administration (NNSA) NEPA responsibilities. The revised Order has an expanded section on applicability and a new section on NNSA procedures. With respect to an EIS for an NNSA activity, the NNSA Administrator will fulfill the responsibilities of a Secretarial Officer (including consulting with the NNSA General Counsel), and the Secretary or Deputy

293

Microsoft PowerPoint - quarterly_1040311.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Review March 11, 2004 C Mod Alcator - C Mod Alcator - Agenda * Status of JOULE milestones and quarterly sub- milestones (due March 31, 2004) - Comparison of single-null, double-null, inner-wall- limited ... (Marmar) - Design of ICRF antenna (Marmar) - Research operation weeks (Irby) * Lower hybrid status (Irby) * Operations plans (Irby) * Recent 2-frequency ITB results (Marmar) C Mod Alcator - JOULE Milestone SC6-1b * Compare energy confinement, H-Mode thresholds, and diverter particle dynamics in single-null, double-null and inner-wall-limited discharges ... - Quarterly sub-milestone: assess energy confinement in double-null discharges (March 31, 2004) * Status - Runs taken to compare single-null and double-null confinement - First limiter H-modes achieved (both lower nose and inner-wall limited), thresholds measured

294

EMSL 3rd Quarter Research Highlights  

NLE Websites -- All DOE Office Websites (Extended Search)

rd Quarter, Fiscal Year 2008 rd Quarter, Fiscal Year 2008 (April 1, 2008, through June 30, 2008) DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by

295

Quarterly Coal Report: July-September 2001  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Distribution Category UC-950 Quarterly Coal Report July - September 2001 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report July - September 2001 ii Contacts This publication was prepared by Paulette Young under the direction of Betsy O'Brien, Director, Coal, Nuclear, and Renewables Fuels Division, Office of Coal, Nuclear, Electric and Alternate Fuels within the Energy Information Administration, U.S.

296

Lessons Learned Quarterly Report, December 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Welcome to the 29th quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Included in this issue: CEQ Chair Describes Goals, Supports NEPA Principles DOE NEPA Post-9/11: Reconciling the Need to Protect and the Need to Inform the Public Agencies Responses to Terrorist Attacks Forest Service Succeeds with NEPA Training Oak Ridge Holds NEPA Community Meeting DOE-wide NEPA Contracts Update Training Opportunities New on the NEPA Bookshelf Litigation Update EAs and EISs Completed This Quarter Recent EIS-Related Milestones Fourth Quarter FY 2001 Questionnaire Results NEPA Document Cost and Time Facts

297

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 4, 2007 September 4, 2007 Lessons Learned Quarterly Report, September 2007 Welcome to the 52nd quarterly report on lessons learned in the NEPA process. This issue highlights the start of two major DOE EISs and features several guest-written articles. June 1, 2007 Lessons Learned Quarterly Report, June 2007 Welcome to the 51st quarterly report on lessons learned in the NEPA process. This issue features collaboration as a key element of a successful NEPA process. Related articles discuss approaches to and benefits of collaboration and illustrate various applications. March 1, 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the

298

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Capacity (short tons of ore per day) 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 EFR White Mesa LLC White Mesa Mill San Juan, Utah 2,000 Operating Operating Operating Operating-Processing Alternate Feed Energy Fuels Resources Corporation Piñon Ridge Mill Montrose, Colorado 500 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Permitted And Licensed Energy Fuels Wyoming Inc Sheep Mountain Fremont, Wyoming 725 - Undeveloped Undeveloped Undeveloped Kennecott Uranium Company/Wyoming Coal Resource Company Sweetwater Uranium Project Sweetwater, Wyoming 3,000

299

Lessons Learned Quarterly Report, September 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 1999 Lessons Learned Quarterly Report, September 1999 Lessons Learned Quarterly Report, September 1999 Welcome to the 20th Quarterly Report on lessons learned in the NEPA process. This issue includes a cumulative index for the past five years. Articles in this issue include: Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis CEQ Memo on Non-Federal Cooperating Agencies EPA Guidance on Cumulative Impacts DOE NEPA Web Demonstration Publishing a Draft EIS on NEPA Web NAEP Conference Forest Services Decision Protocol DOE-wide NEPA Contracts Update DOE Litigation Update Other Agency NEPA Cases EAs and EISs Completed this Quarter Other EIS-related Documents Third Quarter FY 1999 Questionnaire Results Cost and Time Facts Training Opportunities

300

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and  

Open Energy Info (EERE)

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Authors Ormat Technologies and Inc. Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Citation Ormat Technologies, Inc.. Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results [Internet]. [updated 2013;cited 2013]. Available from: http://www.ormat.com/news/latest-items/ormat-technologies-reports-2012-fourth-quarter-and-year-end-results

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Lessons Learned Quarterly Report, March 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 1997 Lessons Learned Quarterly Report, March 1997 Lessons Learned Quarterly Report, March 1997 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: CEQ Effectiveness Study CEQ Handbook on Cumulative Effects DOE Sites Enhancing Public Participation in EAs Stockpile Stewardship and Management ROD Issued EIS Distribution: Coordination with Congressional, Public and Intergovernmental Affairs EPA EIS Rating System Results of EA Quality Review DOE NEPA Web as Research Tool Litigation Updates DOE NEPA Process Data Misused GC to Provide Administrative Record Guidance Questions and Answers on Supplement Analyses First Quarter FY 1997 Lessons Learned Questionnaire Results, including EIS and EA Cost and Time reports Lessons Learned Quarterly Report

302

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements » Lessons Learned » Lessons Learned Guidance & Requirements » Lessons Learned » Lessons Learned Quarterly Report Archive Lessons Learned Quarterly Report Archive December 2, 2013 Lessons Learned Quarterly Report, December 2013 Welcome to the 77th quarterly report on lessons learned in the NEPA process. This issue reminds us that, through teamwork and dedication by DOE's NEPA community, we can produce high quality documents that enhance the Department's decisionmaking and help protect the environment. September 6, 2013 Lessons Learned Quarterly Report, September 2013 Welcome to the 76th quarterly report on lessons learned in the NEPA process. This issue features a look at DOE's NEPA performance metrics, including a historical perspective. As DOE NEPA practitioners strive to control time and cost while maintaining quality, this most recent NEPA

303

Lessons Learned Quarterly Report, March 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2013 March 2013 Lessons Learned Quarterly Report, March 2013 In this issue, we highlight the many benefits of NEPA to DOE, including improved planning, and better public involvement and environmental protection. Articles in this issue include: Sharing DOE's NEPA Success Stories Integrating NEPA and Project Planning Works Minimize EIS Printing Costs DOE Cooperating Agency Report Electronic Guidance Compendium Tribal Energy Resource CEQ IT Working Group Conferences DOE-wide NEPA Contracts Update Transitions EAs and EISs Completed This Quarter Questionnaire Results Cost and Time Facts LLQR-2013-Q1.pdf More Documents & Publications Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, March 2013 Lessons Learned Quarterly Report, June 2013 Lessons Learned Quarterly Report, September

304

Lessons Learned Quarterly Report, December 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 1996 Lessons Learned Quarterly Report, December 1996 Lessons Learned Quarterly Report, December 1996 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: "NEPA Compliance Officers Meeting: Continuous Improvement" DOE Comments on CEQ Cumulative Impacts Handbook DOE-wide NEPA Procurement Environmental Justice Guidance Update Senate Subcommittee Focuses on NEPA DOE NEPA Rule Amendments for Power Marketing Activities Litigation Updates: Rulings on Alternatives Environmental Assessment Quality Study Fourth quarter FY1996 Lessons Learned Questionnaire results, including EIS and EA cost and time reports Analysis of EA and EIS cost and time outliers EA and EIS cost and time trend analysis Lessons Learned Quarterly Report

305

Financial News for Major Energy Companies, Fourth Quarter 2005  

Gasoline and Diesel Fuel Update (EIA)

Fourth Quarter 2005 Fourth Quarter 2005 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $28.7 billion on revenues of $298.4 billion (i.e., 9.6 cents of net income per dollar of revenue) during the fourth quarter of 2005 (Q405). The level of net income for Q405 was 43 percent higher than in the fourth quarter of 2004 (Q404) (Table 1). Net income for Q405

306

Lessons Learned Quarterly Report, September 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1998 September 1998 Lessons Learned Quarterly Report, September 1998 Welcome to the third quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: DOE NEPA Community to Meet in October Guidance Underway to Assist NEPA Process National Academy of Public Administration Examines the DOE NEPA Process NEPA Practitioners Bookshelf Publishing a Draft EIS on the Web DOE-Wide NEPA Contracts Showing Benefits NAEP Conference in San Diego Litigation Updates Presidential Memorandum on Plain Language Third Quarter FY 1998 Questionnaire Results NEPA Document Cost and Time Facts NEPA Documents Completed EIS-related Documents Recent Milestones Cumulative Index Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, September 2002

307

Lessons Learned Quarterly Report, December 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, December 2012 This issue highlights practices of DOE's NEPA Community that help ensure the quality of our NEPA reviews. Emphasizing quality throughout the NEPA process is essential to meeting schedules and providing useful information to the public and decisionmakers. Articles in this issue include: Quality Assurance Integral to NEPA Implementation DOE NEPA Guidance Plans OMB-CEQ Affirm Commitment to ECR Canada's New NEPA-Like Law Transitions John Jediny Joins DOE NEPA Office EAs and EISs Completed This Quarter Questionnaire Results Cost and Time Facts LLQR-2012-Q4-r1.pdf More Documents & Publications Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, March 2013

308

June 1,1998, Issue No. 15 For Second Quarter FY 1998 NEPA Compliance Officers Meet in DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,1998, Issue No. 15 For Second Quarter FY 1998 ,1998, Issue No. 15 For Second Quarter FY 1998 NEPA Compliance Officers Meet in DC How can NEPA Compliance Officers (NCOs) become more effective? What can the Offices of Environment, Safety and Health (EH) and General Counsel (GC) do to better support the NCOs? Field and Program NCOs and staff of the Offces of NEPA Policy and Assistance and the Assistant General Counsel for Environment met in Washington, DC, on March 26 and 27 to explore these questions. needs for their Offices and spoke of the value of the Lessons Learned Quarterly Report in Department-wide NEPA coordination. NCOs with tasks under the DOE-wide NEPA support contracts expressed satisfaction that the expected benefits (reduced time and cost) are materializing. A panel told of experiences integrating

309

Energy Emergency Energy Emergency Preparedness Quarterly Preparedness Quarterly  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability (OE) Infrastructure Security and Energy Restoration (ISER) Deputy Assistant Secretary ISER William N. Bryan Director, Preparedness and Response ISER Stewart Cedres Visit us at: http://energy.gov/oe/services/energy-assurance/emergency-preparedness V O L U M E 2 , I S S U E 4 O C T O B E R 1 5 , 2 0 1 3 Next year the Department of Energy will celebrate an important milestone-the 25th anniversary of the Department's first energy emergency field deployments to provide disaster support to an impacted State or U.S. Territory. As the Department's energy response has evolved over time, so too, has the office charged with leading

310

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA and Contracting Communities NEPA and Contracting Communities Take Action Following Workshops Innovative ideas for improving the Department’s NEPA contracting process emerged from the first gathering of field office and headquarters NEPA and procurement specialists at a workshop sponsored by the Office of NEPA Policy and Assistance, in partnership with the Office of Human Resources and Administration and the Office of General Counsel. The March 1996 NEPA Contracting Reform Workshop explored the theme of “Do It Right the First Time,” the central recommendation of the Phase II NEPA Contracting Reform Guidance that the Assistant Secretary for Environment, Safety and Health issued in December 1995. The March Workshop’s purpose was to identify contracting actions that can achieve NEPA process cost savings through better management of existing contracts and

311

Lessons Learned Quarterly Report, Fourth Quarter FY 2001 (12/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2001 December 5, 2001; Issue No. 29 CEQ Chair Describes Goals, Supports NEPA Principles The Council on Environmental Quality (CEQ) wants Federal agencies to weave environmental considerations into everyday business, as opposed to conducting NEPA compliance as a distinct project to fend off lawsuits. Recently appointed CEQ Chair James L. Connaughton (Lessons Learned Quarterly Report, June 2001, page 12) described this and other key CEQ goals at a September 21, 2001, meeting with Federal agency NEPA Contacts. Mr. Connaughton made it clear that this administration supports NEPA’s principles “as much as all previous administrations.” In this connection, he referred to

312

Environmental Compliance Performance Scorecard - First Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - First Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2013 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Third

313

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First

314

Oil Bypass Filter Technology Evaluation - Second Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-03-00620 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Second Quarterly Report January - March 2003 Larry Zirker...

315

Oil Bypass Filter Technology Evaluation - Fifth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-04-01618 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Fifth Quarterly Report October - December 2003...

316

Oil Bypass Filter Technology Evaluation - Eighth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-04-02486 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eighth Quarterly Report July-September 2004...

317

Oil Bypass Filter Technology Performance Evaluation - First Quarterly...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-03-00129 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Performance Evaluation First Quarterly Report Larry Zirker James...

318

Oil Bypass Filter Technology Evaluation - Sixth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-04-02004 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Sixth Quarterly Report January - March 2004...

319

3rd Quarter 2011 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA)

3rd Quarter 2011 Domestic Uranium Production Report Subject: U.S ... drilling, employment, exploration, in situ leach, inventory, mill, mine, nuclear, ...

320

U.S. Energy Information Administration | Quarterly Coal Distribution...  

U.S. Energy Information Administration (EIA) Indexed Site

3rd Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke)...

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Natural gas imports and exports: First quarter report 1995  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This quarter`s focus is market penetration of gas imports into New England. Attachments show the following: % takes to maximum firm contract levels and weighted average per unit price for the long-term importers, volumes and prices of gas purchased by long-term importers and exporters, volumes and prices for gas imported on short-term or spot market basis, and gas exported short-term to Canada and Mexico.

NONE

1995-07-01T23:59:59.000Z

322

2nd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

Information Administration: Form EIA-851A and Form EIA-851Q, ""Domestic Uranium Production Report.""" "4 U.S. Energy Information Administration 2nd Quarter 2013 Domestic...

323

Fossil Energy Today - Fourth Quarter, 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Fossil Energy Today - Fourth Quarter, 2012 Topics In This Issue.... National Sequestration Education Center Opens in Illinois Environment, Security, Safety & Health in the Office...

324

Fossil Energy Today - Second Quarter, 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Fossil Energy Today - Second Quarter, 2011 Topics In This Issue... Office Reorganization McConnell Joins FE Staff Coal Cleaning Commercial Success Sonar Survey Program Heating...

325

NEAMS Quarterly Report for January-March 2013  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes highlights, fuel and reactor product line accomplishments, recent and upcoming milestones, a technical...

326

NEAMS Quarterly Report for July-September 2012  

Energy.gov (U.S. Department of Energy (DOE))

The NEAMS quarterly report includes highlights, a spotlight on personal achievements, accomplishments, recent and upcoming milestones, and a technical spotlight on modeling precipitate nucleation.

327

NEAMS Quarterly Report for October-December 2012  

Energy.gov (U.S. Department of Energy (DOE))

TheNuclear Energy Advanced Modeling and Simulation (NEAMS)quarterly report includes updates, highlights, fuels and reactors product line accomplishments, integration accomplishments, recent and...

328

Quarterly Survey of Plant Capacity Utilization | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Survey of Plant Capacity Utilization Manufacturing DataTools ResearchTech Services Apps Challenges Blogs Let's Talk Manufacturing You are here Data.gov Communities...

329

ASC eNews Quarterly Newsletter December 2012 | National Nuclear...  

National Nuclear Security Administration (NNSA)

& Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASC eNews Quarterly Newsletter December 2012 ASC eNews...

330

ASC eNews Quarterly Newsletter September 2012 | National Nuclear...  

National Nuclear Security Administration (NNSA)

& Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASC eNews Quarterly Newsletter September 2012 ASC eNews...

331

ASC eNews Quarterly Newsletter March 2013 | National Nuclear...  

National Nuclear Security Administration (NNSA)

& Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASC eNews Quarterly Newsletter March 2013 ASC eNews...

332

ASCeNews Quarterly Newsletter - December 2011 | National Nuclear...  

National Nuclear Security Administration (NNSA)

& Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASCeNews Quarterly Newsletter - December 2011 ASCeNews...

333

ASCeNews Quarterly Newsletter - March 2012 | National Nuclear...  

National Nuclear Security Administration (NNSA)

& Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASCeNews Quarterly Newsletter - March 2012 ASCeNews...

334

Short-term energy outlook. Quarterly projections, 2nd quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

Not Available

1994-05-01T23:59:59.000Z

335

DOE/SC-ARM-11-001 ARM Climate Research Facility Quarterly Instrument...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facility Quarterly Instrument Report Fourth Quarter: October 1-December 30, 2010 JW Voyles January 2011 Work supported by the U.S. Department of Energy, Office of...

336

Biomass power for rural development. Quarterly report, April 2, 1997--July 2, 1997  

DOE Green Energy (OSTI)

The information in this report summarizes the major areas of project activities accomplished during the last quarter. Activities concerning conversion technologies have continued to be focused on gaining information and comparing similar systems world wide with project needs. One major effort was a trip to Denmark and Finland; the first section of the report details some of the trip highlights. The second section is a writeup of a previous trip. Additional conversion work undertaken at Iowa State University on the development of material handling, gas sampling, and gas analysis equipment is detailed. An update on the installation of field trial plots is also included. Very brief summaries are provided of quarterly activities, briquette production from switchgrass, and the development of geographical information systems are also included. 8 figs., 1 tab.

Cooper, J.T.

1997-10-01T23:59:59.000Z

337

Quarterly Report - May through July 2012  

Science Conference Proceedings (OSTI)

The first quarter of my postgraduate internship has been an extremely varied one, and one which I have tackled several different aspects of the project. Because this is the beginning of a new investigation for the Research Library, I think it is appropriate that I explore data management at LANL from multiple perspectives. I have spent a considerable amount of time doing a literature search and taking notes on what I've been reading in preparation for potential writing activities later. The Research Library is not the only research library exploring the possibility of providing services to their user base. The Joint Information Systems Committee (JISC) and the Digital Curation Centre (DCC) in the UK are actively pursuing possibilities to preserve the scientific record. DataOne is a U.S. National Science Foundation (NSF) initiative aimed at helping to curate bioscience data. This is just a tiny sample of the organizations actively looking into the issues surrounding data management on an organizational, cultural, or technical level. I have included a partial bibliography of some papers I have read. Based on what I read, various discussions, and previous library training, I have begun to document the services I feel I could provide researchers in the context of my internship. This is still very much a work in progress as I learn more about the landscape in libraries and at the Laboratory. I have detailed this process and my thoughts on the issue below. As data management is such a complex and interconnected activity, it is impossible to investigate the organizational and cultural needs of the researchers without familiarizing myself with technologies that could facilitate the local cataloging and preservation of data sets. I have spent some time investigating the repository software DSpace. The library has long maintained the digital object repository aDORe, but the differences in features and lack of a user interface compared to DSpace have made DSpace a good test bed for this project. However my internship is not about repository software and DSpace is just one potential tool for supporting researchers and their data. More details my repository investigation. The most exciting aspect of the project thus far has been meeting with researchers, some of which are potential collaborators. Some people I have talked with have been very interested and enthusiastic about the possibility of collaborating, while others have not wanted to discuss the issue at all. I have had discussions with individual researchers managing their own lab as well as with researchers who are part of much larger collaborations. Three of the research groups whom I feel are of particular interest are detailed below. I have added an appendix below which goes into more detail about the protein crystallography community which has addressed the complete data life cycle within their field end to end. The issue of data management is much bigger than just my internship and there are several people and organizations exploring the issues at the Laboratory. I am making every effort to stay focused on small science data sets and ensure that my activities use standards-based approaches and are sustainable.

Miller, Laniece E. [Los Alamos National Laboratory

2012-08-09T23:59:59.000Z

338

Electric and hybrid vehicle project. Quarterly report of private-sector operations, first quarter 1982  

DOE Green Energy (OSTI)

As of January 1, 1982 sixteen private-sector site operators at 30 sites in the US were involved in electric and hybrid electric-powered vehicle demonstration programs. Data for 1981 and the first quarter of 1982 are presented on vehicle selection, miles accumulated, energy usage, maintenance requirements, reliability and operating performance for demonstration vehicles at each site. (LCL)

None

1982-06-01T23:59:59.000Z

339

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

2 2 U.S. Energy Information Administration / 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Table 1. Total production of uranium concentrate in the United States, 1996 - 3rd Quarter 2013 pounds U 3 O 8 Calendar-Year Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Calendar-Year Total 1996 1,734,427 1,460,058 1,691,796 1,434,425 6,320,706 1997 1,149,050 1,321,079 1,631,384 1,541,052 5,642,565 1998 1,151,587 1,143,942 1,203,042 1,206,003 4,704,574 1999 1,196,225 1,132,566 1,204,984 1,076,897 4,610,672 2000 1,018,683 983,330 981,948 973,585 3,975,545 2001 709,177 748,298 628,720 553,060 2,639,256 2002 620,952 643,432 579,723 E500,000 E2,344,107 2003 E400,000 E600,000 E400,000 E600,000

340

FTCP Quarterly Report on Federal Technical Capability, May 18, 2011  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Western Gas Sands Project Quarterly Basin Activities Report  

SciTech Connect

This quarterly basin activities report is a summation of three months drilling and testing activities in the Greater Green River Basin, Northern Great Plains Province, Piceance Basin, and Uinta Basin. Detailed information is given for each study area for the first quarter of 1979.

Atkinson, C H

1979-04-30T23:59:59.000Z

342

Anaerobic treatment of gasifier effluents. Quarterly report  

DOE Green Energy (OSTI)

This report summarizes the work performed during the quarter ending December 30, 1981. The major efforts have been directed toward the continued acclimation of two anaerobic treatment systems, start up of a third anaerobic treatment system, GC/MS characterization of the coal gasification wastewater, data acquisition for determination of distribution coefficients for the extraction of phenol from the wastewater using MIBK, and preliminary design of a solvent extraction system for wastewater pretreatment. The progress of these efforts are depicted in the Gannt Chart, along with project expenditures for the above contract, and are presented in detail in the following sections.

Cross, W.H.; Chian, E.S.K.; Pohland, F.G.; Giabbai, M.; Harper, S.R.; Kharkar, S.; Cheng, S.S.; Shuey, P.S.

1982-01-01T23:59:59.000Z

343

OE Releases Third Issue of Energy Emergency Preparedness Quarterly (July  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Issue of Energy Emergency Preparedness Quarterly Third Issue of Energy Emergency Preparedness Quarterly (July 2012) OE Releases Third Issue of Energy Emergency Preparedness Quarterly (July 2012) July 13, 2012 - 12:45pm Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released the third issue of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter. The third issue of the EEPQ includes news items on the release of the Electricity Cybersecurity Risk Management Process guideline and the Electricity Cybersecurity Capability Maturity Model, and the National Energy Assurance Conference and 3rd Electric Infrastructure Security Summit, both co-sponsored by DOE. All issues of the EEPQ are available for download from the Emergency

344

Lessons Learned Quarterly Report, June 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1998 1998 Lessons Learned Quarterly Report, June 1998 Welcome to the second quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: NCO Meeting in DC The Role of the NCO Special Considerations in Applying Categorical Exclusions NEPA Training Anticipated DOE-wide NEPA Contracts Integrating NEPA with Other Reviews Advice from GC NRC Adopts DOE NEPA Documents at NEEL Alternative Dispute Resolution Clean Air Act Conformity Requirements Ecological Society Briefing NAPA Evaluates DOE NEPA Program NEPA Guidance Updates Litigation Updates Second Quarter FY98 Questionnaire Results EIS-related Documents Recent EIS Milestones EA Completion Times and Costs Lessons Learned Quarterly Report (LLQR) More Documents & Publications ADR Revised Policy

345

Lessons Learned Quarterly Report, March 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 1998 Lessons Learned Quarterly Report, March 1998 Lessons Learned Quarterly Report, March 1998 Welcome to the first quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: Managing Progress on the Repository EIS Richland EA: Public Involvement and Classified Information WIPP and WM RODs Issued DOE-wide NEPA Contracts Update Early NEPA Review Saves Resources Technical Assistance from Core Technical Group Recent NEPA Guidance EPA Proposes Changes to Voluntary EIS Policy Anticipating the Discovery of Unknown Waste DOE Planning Summaries Provide NEPA Forecasts Recent EIS Milestones NAEP Identifies Accepted NEPA Practices Environmental Restoration's NCO Describes His Role Richlands NEPA Process Game Enlivens Training Transitions

346

Lessons Learned Quarterly Report, March 2000 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2000 Lessons Learned Quarterly Report, March 2000 Lessons Learned Quarterly Report, March 2000 Welcome to the 22nd Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources DOE Inspector General Report Questions Categorical Exclusion Application DOE Decides Disposition of Surplus Plutonium Interview with New NEPA Director at CEQ Transitions DOE Issues Decisions on Low-level and Mixed Low-level Waste Waste Isolation Pilot Plant's 25-Year History Considering Essential Fish Habitat in NEPA Reviews NEPA Guidance Updates Web Site of Interest DOE-wide NEPA Contracts Update Training Opportunities DOE Litigation Updates Other NEPA Cases EAs and EISs Completed This Quarter

347

Lessons Learned Quarterly Report, September 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 1996 Lessons Learned Quarterly Report, September 1996 Lessons Learned Quarterly Report, September 1996 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: Defense Programs NCO Fosters Teamwork through Meetings Internal Scoping at Richland Visual Excellence Responding to Comments on DOE EISs Improving Comment Resolution with EPA EPA Commends DOE for "Model" Pollution Prevention Analysis Litigation Updates 1996 Federal Environmental Quality Award Winners: USACE and MMS Amended Rule Streamlines DOE NEPA Process Book Review: Environmental Impact Assessment Third quarter FY 1996 Lessons Learned Questionnaire results, including EIS and EA cost and time reports, and analysis models and codes used in DOE EAs and EISs

348

Program Update: 3rd Quarter 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3rd Quarter 2010 3rd Quarter 2010 Program Update: 3rd Quarter 2010 Inside this Update: Public Access Established for the Dr. Modesto Iriarte Technological Museum in Rincόn, Puerto Rico; Draft LM Strategic Plan Available for Review; Legacy Management Business Center Awarded Second Energy-Efficiency Award; LM Assumes Responsibility for Yucca Mountain Records and Information; Natural Gas Sampling at the Gasbuggy, New Mexico; Rio Blanco and Rulison, Colorado; Nuclear Gas Sites; Students from Native American Environmental Youth Camp Tour Tuba City, Arizona, Site; 2010 Long-Term Surveillance and Maintenance Conference, and more. Office of Legacy Management (LM) Program Update, July-September 2010 More Documents & Publications Program Update: 3rd Quarter 2011 Program Update: 3rd Quarter 2012

349

Lessons Learned Quarterly Report, June 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1999 1999 Lessons Learned Quarterly Report, June 1999 Welcome to the second quarter FY 1999 Quarterly Report on lessons learned in the NEPA process. In addition to the articles beginning on page 1, this issue includes: Consolidated Decision Ends Tritium Trilogy Tale NEPA and Habitat Management Plan: Environmental Synergy Advisory Council on Historic Preservation Revises Section 106 Regulations Mini-guidance Plain Language for NEPA Federal Register Notices Distributing a Record of Decision A Helpful Hint for EIS Glossaries New Books for the NEPA Practitioners Bookshelf DOE-wide NEPA Contracts Update Court Allows WIPP to Open Transitions at the CEQ EH Electronic Publishing Standards and Guidelines Training Opportunities Documents Issued, Second Quarter FY 1999 Second Quarter FY 1999 Questionnaire Results

350

75th Lessons Learned Quarterly Report Issued | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5th Lessons Learned Quarterly Report Issued 5th Lessons Learned Quarterly Report Issued 75th Lessons Learned Quarterly Report Issued June 3, 2013 - 4:11pm Addthis The 75th quarterly report on lessons learned in the NEPA process was issued on June 3, 2013. This issue of Lessons Learned Quarterly Report (LLQR) includes articles on recent guidance by the Council on Environmental Quality and Advisory Council on Historic Preservation to promote better integration of NEPA and Section 106 reviews, and on the Federal Highway Administration's Every Day Counts intitiative to better integrate planning and NEPA. "Efforts such as these to improve NEPA implementation are indicative of what we strive for at DOE every day -- better NEPA review, better decisions," said Carol Borgstrom, Director, Office of NEPA Policy and

351

Quarterly Coal Distribution Report July … September 2013  

Gasoline and Diesel Fuel Update (EIA)

January 2014 January 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report July - September 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. iii U.S. Energy Information Administration | Quarterly Coal Distribution Report 3 rd Quarter 2013 Quarterly Coal Distribution Table Format and Data Sources In keeping with EIA's efforts to increase the timeliness of its reports, this Quarterly Coal Distribution Report is a preliminary

352

77th Lessons Learned Quarterly Report Issued | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77th Lessons Learned Quarterly Report Issued 77th Lessons Learned Quarterly Report Issued 77th Lessons Learned Quarterly Report Issued December 3, 2013 - 3:18pm Addthis The 77th quarterly report on lessons learned in the NEPA process was issued on December 2, 2013. This issue of Lessons Learned Quarterly Report (LLQR) examines positive outcomes of the NEPA process. Featured articles include a review by the Office of NEPA Policy and Compliance of nearly 400 excerpts from questionnaire responses published in LLQR during the past 10 years regarding the usefulness and effectiveness of the NEPA process. An overwhelming majority of the questionnaire responses describe positive outcomes and illustrate that we can produce high quality documents that enhance the Department's decisionmaking and help protect the environment.

353

Financial News for Major Energy Companies, Second Quarter 2006  

Gasoline and Diesel Fuel Update (EIA)

Second Quarter 2006 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or do not provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $30.1 billion on revenues of $297.1 billion during the second quarter of 2006 (Q206). The level of net income for Q206 was 36 percent higher than in the second quarter of 2005 (Q205) (Table 1). Net income for Q206 increased primarily as a result of higher crude oil

354

NEPA Success Stories from Lessons Learned Quarterly Reports | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports This document contains a compilation of NEPA "success stories" that were featured in DOE Lessons Learned Quarterly Reports (LLQRs). Feature articles in LLQR have described how the NEPA process provided an organized structure for making some of the Department's most complex decisions. NEPA reviews have resulted in significant project cost savings through informed decision making. Some articles have highlighted ways in which the NEPA process improved environmental outcomes, such as by identifying better alternatives or more effective mitigation. Some articles have put the spotlight on procedural success, such as effective public

355

Lessons Learned Quarterly Report, March 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2009 Lessons Learned Quarterly Report, March 2009 Lessons Learned Quarterly Report, March 2009 Welcome to the 58th quarterly report on lessons learned in the NEPA process. We have been very busy addressing our NEPA responsibilities arising from the recovery act as well as the new policies of the obama administration. In this issue of the Lessons Learned Quarterly Report (LLQR), we share ideas and experiences that will foster an improved and expedited NEPA compliance process. Articles included in this issue: NEPA Efficiency Essential to Recovery Plan NEPA Opportunities in a New Era of Openness Secretary Chu to DOE Employees: "Help Turn the Ship" Secretary Chu Pledges to Improve DOE Management New DOE-Wide NEPA Support Contracts! Sutley Brings Breadth of Government Experience to CEQ

356

Quarterly Coal Distribution Report April … June 2013  

U.S. Energy Information Administration (EIA) Indexed Site

October 2013 October 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report April - June 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. iii U.S. Energy Information Administration | Quarterly Coal Distribution Report 2 nd Quarter 2013 Quarterly Coal Distribution Table Format and Data Sources In keeping with EIA's efforts to increase the timeliness of its reports, this Quarterly Coal Distribution Report is a preliminary

357

Short-term energy outlook: Quarterly projections  

SciTech Connect

The Energy Information Administration (EIA) quarterly forecasts of short-term energy supply, demand, and prices are revised in January, April, July, and October for publication in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes previous forecast errors, compares recent projections by other forecasters, and discusses current topics of the short-term energy markets (see Short- Term Energy Outlook: Annual Supplement, DOE/EIA-0202). The principal users of the Outlook are managers and energy analysts in private industry and government. The projections in this volume extend through the fourth quarter of 1990. The forecasts are produced using the Short-term Integrated Forecasting System (STIFS). The STIFS model uses two principal driving variables: a macroeconomic forecast and world oil price assumptions. Macroeconomic forecasts produced by data Resources, Inc., (DRI), are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic forecast. EIA's Oil Market Simulation Model is used to project world oil prices. 20 refs., 17 figs., 16 tabs.

1989-07-01T23:59:59.000Z

358

Short-term energy outlook. Quarterly projections  

SciTech Connect

Energy Information Administration (EIA) quarterly forecasts of short-term energy supply, demand, and prices are revised in February, May, August, and November for publication in the Short-Term Energy Outlook, quarterly projections. Methodology volumes, which are published with the May and November issues, contain descriptions of the forecasting system and detailed analyses of the current issues that affect EIA's short-term energy forecasts. The forecasts are produced using the Short-Term Integrated Forecasting System (STIFS). Two principal driving variables are used in the STIFS model: the macroeconomic forecast and the world oil price assumptions. The macroeconomic forecasts, which are produced by Data Resources, Inc., (DRI), are adjusted by EIA in cases where EIA projections of the world price of crude oil differ from DRI estimates. EIA's Oil Market Simulation Model is used to project the world oil prices. The three projections for petroleum supply and demand are based on low, medium, and high economic growth scenarios which incorporate high, medium, and low crude oil price trajectories. In general, the following discussion of the forecast refers to the medium, or base case, scenario. Total petroleum consumption sensitivities, using varying assumptions about the level of price, weather, and economic activity are tabulated.

1983-08-01T23:59:59.000Z

359

Synthesis of acrylates. Quarterly report, 1996  

DOE Green Energy (OSTI)

Eastman has completed its experimental work in the generation of propionate derivatives. Over the last quarter, Eastman has primarily devoted its time to completing the documentation and developing the potential extension of the oxidative condensation to dimethyl ether. Eastman has completed internal invention reports covering two patents and is working on the third with RTI which they expect to complete within the month. Becthel has also completed its work on the cost analysis of the propionate synthesis work (Task 1). RTI is continuing to develop active and stable catalysts for the condensation of propionic acid and formaldehyde. A total of 74 acid-base catalysts have been tested so far. Two invention reports have been completed based on RTI and Eastman`s work. A third invention report is currently being prepared for Eastman`s review on a novel methodology of methyl propionate activation. RTI is continuing to synthesize more acid-base catalysts with a goal of developing a catalyst which exhibits stable activity over a 200 h test period. Over the last quarter, RTI has also completed its initial tests on the slurry reactor system.

NONE

1996-10-01T23:59:59.000Z

360

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #20, July-September 2008  

SciTech Connect

July to September, 2008 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D. J.

2008-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #22, January - March 2009  

Science Conference Proceedings (OSTI)

January to March, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Not Available

2009-04-01T23:59:59.000Z

362

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009  

DOE Green Energy (OSTI)

July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-10-01T23:59:59.000Z

363

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #25, October - December 2009  

DOE Green Energy (OSTI)

October to December, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2010-01-01T23:59:59.000Z

364

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #15, April - June 2007  

DOE Green Energy (OSTI)

July quarterly update for the National Bioenergy Center's Biochemical Processing Platform Integration Project.

Schell, D.

2007-07-01T23:59:59.000Z

365

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #23, April-June 2009  

DOE Green Energy (OSTI)

April to June, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-08-01T23:59:59.000Z

366

Lessons Learned Quarterly Report, March 2002, Issue No. 30, First Quarter FY 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2002 March 1, 2002; Issue No. 30 LESSONS LEARNED LEARNED LESSONS CEQ Guidance Encourages Agency Cooperation DOE Experience Is Generally Positive Better cooperation and coordination – always a good idea in the NEPA process – is given an extra boost by the Council on Environmental Quality (CEQ) in new guidance. James Connaughton, CEQ Chair, in a January 30, 2002, letter to Heads of Federal Agencies, underscores the benefits of enhanced cooperating agency involvement in the NEPA process. These benefits, including analytical and process efficiencies, improved trust among stakeholders, and greater likelihood of successful implementation of a proposed action, extend to both

367

Lessons Learned Quarterly Report, Issue No. 32; Third Quarter FY 2002 (September 3, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2002 September 2002 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Third Quarter FY 2002 September 3, 2002; Issue No. 32 LESSONS LEARNED LEARNED LESSONS continued on page 3 NEPA Community Meeting Addresses Reform Initiatives James Connaughton, CEQ Chair, urged linking NEPA with EMS. Challenged to “Reform and Re-energize NEPA Implementation,” more than 150 members of the DOE NEPA Community convened in Washington, DC, on July 16 and 17, 2002, at the annual meeting sponsored by the Office of NEPA Policy and Compliance. Highlights of the meeting included presentations by James Connaughton, Chair, Council on Environmental Quality (CEQ), and the senior environmental advisor to the President; and Robert Card, Under Secretary for Energy,

368

NEPA Lessons Learned Quarterly Report; Third Quarter FY 2003 (September2, 2003)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2003 September 2003 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Third Quarter FY 2003 September 2, 2003; Issue No. 36 LESSONS LEARNED LEARNED LESSONS DOE NEPA Community Gauges Progress In Its Continuing Pursuit of Excellence continued on page 3 "I believe we will never get to a point where we say this is done, there is nothing left to learn." - Beverly Cook "Are We There Yet?" - that is, has DOE achieved its goals for NEPA process improvement? - was the theme of the DOE NEPA Community Meeting on July 15 and 16, 2003. Participants considered DOE's NEPA performance with respect to multiple objectives using a variety of measures, finding both substantial progress and room for improvement. The meeting included

369

NEPA Lessons Learned Quarterly Report; Issue No. 37; Fourth Quarter FY 2003 (12/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2003 December 2003 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2003 December 1, 2003; Issue No. 37 LESSONS LEARNED LEARNED LESSONS What's Next? CEQ Seeks More Input on Task Force Recommendations continued on page 3 NEPA practitioners, agencies, special interest groups, and the general public are reacting to recommendations intended to improve and modernize NEPA implementation presented in the NEPA Task Force Report to the Council on Environmental Quality: Modernizing NEPA Implementation, issued in September 2003. Through a series of meetings and regional roundtable discussions, CEQ is now seeking broad input on what should be done, how it should be done, and with what priority. Noting that the Report was to,

370

Microsoft Word - Apr-June 2012 Monticello Quarterly_S09178_FFA -final.doc  

Office of Legacy Management (LM)

2 2 June 2012 Doc. No. S09178 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement Quarterly Report: April 1-June 30, 2012 1.0 Introduction This report summarizes the status of the Monticello Vicinity Properties (MVP) and the Monticello Mill Tailings Site (MMTS), located in and near Monticello, Utah, for the period of April through June 2012. The report also includes a summary of projected near-term activity and reporting requirements. Quarterly reports are submitted to the U.S. Environmental Protection Agency (EPA) and the Utah Department of Environmental Quality (UDEQ) to apprise project managers of project status and near-term schedule of activities and reporting requirements. The MMTS and MVP were placed on the EPA National Priorities List (NPL) in 1989 and 1986,

371

Lessons Learned Quarterly Report; Fourth Quarter FY 2002; December 2, 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2002 December 2, 2002; Issue No. 33 LESSONS LEARNED LEARNED LESSONS CEQ Asks How to Improve NEPA Implementation; Responses Vary Widely continued on page 5 In response to questions from the Council on Environmental Quality's (CEQ's) NEPA Task Force, Federal, state, local, and tribal agencies, environmental and business groups, and individual citizens have weighed in during the past few months with opinions on how to improve NEPA implementation. CEQ also sought and received examples of best practices and case studies. Collectively, the comments cover nearly every aspect of NEPA implementation. They range from strong support for the value of the NEPA process to sharp criticism,

372

NEPA Lessons Learned Quarterly Report, March 1, 2004; Issue No. 38; First Quarter FY 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2004 March 2004 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2004 March 1, 2004; Issue No. 38 LESSONS LEARNED LEARNED LESSONS Need Help Preparing NEPA Documents? New, Improved "Green Book" Is on the Way (continued on page 15) By: Carl Sykes, Office of NEPA Policy and Compliance Carl Sykes is leading the charge to strengthen the Green Book, DOE's NEPA primer. The time has come for the DOE NEPA Community to work together to strengthen our basic NEPA guidebook, Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements (also known as the "Green Book"). The Green Book (www.eh.doe.gov/nepa under Guidance) is certainly no weakling: it provides succinct recommendations for key

373

NEPA Lessons Learned Quarterly Report; Third Quarter 2000 (09/01/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Lessons Learned September 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 2000 September 1, 2000; Issue No. 24 NEPA staff positions open. Apply by September 8. See page 2. Emergency NEPA Procedures Invoked for Actions Taken after Los Alamos Fire To avert further harm in the wake of the May 2000 Los Alamos wildfire, DOE is taking emergency actions with potentially significant impacts, without preparing an EIS. Instead, DOE is proceeding under “alternative arrangements” to comply with NEPA, as provided under 40 CFR 1506.11, a section of the Council on Environmental Quality (CEQ) NEPA regulations that deals with emergency circumstances. The specific alternative

374

QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) 1991 1 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION February 1991 This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunications Device for the

375

QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) 1991 3 QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION August 1991 This publication may be purchased from the Superintenden t of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunica tions device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunic ations Device for the

376

Lessons Learned Quarterly Report; March 3, 2003; Issue No. 34; First Quarter FY 2003  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Lear Lessons Lear ned March 2003 1 wealth of information that informs the NEPA process, he explained. Mr. Greczmiel told the workshop audience that the CEQ NEPA Task Force, which he directs, has looked at ways EMS could improve NEPA implementation. An EMS can improve relations with local communities, especially with regulators, who appreciate the Federal effort to address environmental issues systematically, he said. Another benefit of an EMS, he noted, is that it can provide methods for following up NEPA's predictive analysis. National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2003 March 3, 2003; Issue No. 34 LESSONS LEARNED LEARNED LESSONS New DOE Order Focuses on EMS, Supports Basic NEPA Principles Few Comments Received on Proposed

377

(Great Plains Coal Gasification project): Quarterly environmental, safety, medical, and industrial hygiene report, fourth quarter 1986  

SciTech Connect

Contents of this quarterly report include: (1) environmental monitoring program; (2) supplemental environmental program; (3) quality assurance/quality control activities; (4) schedule of activities for next reporting period; (5) safety; (6) medical services; and (7) industrial hygiene. The environmental monitoring program covers: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. Supplemental environmental program includes: performance survey; toxicity screening study; data base management system; epidemiology; and contingency program.

Not Available

1987-01-01T23:59:59.000Z

378

Great Plains Coal Gasification project. Quarterly technical progress report, third quarter 1985  

Science Conference Proceedings (OSTI)

The operations of the Great Plains Gasification Plant are reported for the third quarter of 1985. Contents include the following: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications-1985; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical services; (12) environmental; and (13) quality assurance/quality control activities.

Not Available

1985-10-31T23:59:59.000Z

379

Great Plains Coal Gasification Project. Quarterly environmental report, second quarter, 1986  

Science Conference Proceedings (OSTI)

Following the executive summary, this quarterly report includes environmental monitoring program, supplemental environmental program, and quality assurance/quality control activities. Under the environmental monitoring program, the following topics are covered: permiting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. The supplemental environmental program includes: performance survey; toxicity screening study; data base management system; epidemiology; and contingency program. (AT)

Not Available

1986-07-01T23:59:59.000Z

380

Great Plains Coal Gasification project. Quarterly technical progress report fourth quarter, 1985  

SciTech Connect

The operations of the Great Plains Gasification plant are reported for the fourth quarter of 1985. Contents include the following: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications - 1985; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical service; (12) environmental; and (13) quality assurance/quality control activities.

Not Available

1986-01-31T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

(Great Plains coal gasification project): Quarterly environmental report, Third quarter 1986  

Science Conference Proceedings (OSTI)

Environmental monitoring, supplemental environmental programs and quality assurance/quality control activities are presented in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. The supplemental environmental program covers: performance survey; toxicity screening study; data base management system; epidemiology; and contingency program. 16 figs., 53 tabs. (AT)

Not Available

1986-10-01T23:59:59.000Z

382

Quarterly environmental radiological survey summary second quarter 1996 100, 200, 300 and 600 areas  

Science Conference Proceedings (OSTI)

This report provides a summary of the radiological surveys performed in support of the operational environmental monitoring program at the Hanford Site. The Second Quarter 1996 survey results and the status of actions required from current and past reports are summarized below: All the routine environmental radiological surveys scheduled during April, May, and June 1996 were completed. One Hundred twenty- five environmental radiological surveys were performed during the second quarter of 1996, twenty nine at the active waste sites and ninety six at the inactive waste sites. Contamination above background levels Wag found at three of the active waste sites and fifteen of the inactive waste sites. Contamination levels as high as 65,000 disintegrations per minute (dpm) were reported. Of these contaminated surveys seven were in Underground Radioactive Material (URM) areas and one was in an unposted area. The contamination found within three of the URM areas was immediately cleaned up and no further action was required. In the remaining four sites the areas were posted and will require decontamination. At the site where there was no posting, the contamination was below action levels, however, Site Support Services was notified. Radiological Problem Reports (RPR`s) were issued and the sites were turned over to the landlord for further action if required. During the second quarter 1996, 0. 7 hectares (1.7 acres) were stabilized and radiologically down posted from Surface Contamination (SC) to URM. No Compliance Assessment Reports (CARS) were issued for sites found out of compliance with standards identified in WHC-CM-7-5, Environmental Compliance. No Surveillance Compliance/Inspection Reports (SCIR) were closed during the Second Quarter of 1996. Five open SCIRB had not been resolved.

Dorian, J.J., Westinghouse Hanford

1996-07-26T23:59:59.000Z

383

(Great Plains Gasification Associates) quarterly technical progress report, 1st quarter 1985  

SciTech Connect

This quarterly report covers the following subjects: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) raw material and energy consumption for the mine; (8) plant modifications-1985 budget; (9) plant maintenance; (10) safety; (11) industrial hygiene; (12) medical services; and (13) quality assurance/quality control activities.

Not Available

1985-04-30T23:59:59.000Z

384

Natural gas imports and exports, fourth quarter report 1999  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-03-01T23:59:59.000Z

385

Natural gas imports and exports, first quarter report 2000  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-06-01T23:59:59.000Z

386

Natural gas imports and exports, third quarter report 2000  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-12-01T23:59:59.000Z

387

Phase II - photovoltaics for utility scale applications (PVUSA). Quarterly technical report, First quarter 1996  

SciTech Connect

This is the first of three planned quarterly Technical Reports of 1996 system performance and major project activities. The final quarter will be discussed in the 1996 Progress Report. Activity for the PVUSA project was curtailed considerably, pending resolution of the transfer of management to the California Energy Commission (CEC) and the Sacramento Municipal Utility District (SMUD). Principal activities during the first quarter of 1996 included: (1) Continued negotiations regarding the transfer of project management from PG&E to the joint CEC/SMUD team. Primary remaining hurdle is obtaining approval from the California Public Utilities Commission. (2) Provided training to CEC and SMUD project team members on January 8, 9, and 11. Training covered site operations including data acquisition. (3) Completed the draft of the 1995 Progress Report. (4) Supported the contractor in their efforts for enhancing the performance and reliability of the Amonix EMT-3 array at Davis. (5) Reviewed the PSCo installation drawings, and started activities to provide the PVUSA DAS equipment, (6) Operation and maintenance of existing systems, including data collection and reporting. Data were collected for 19 completed systems with a combined capacity of 1,800 kW. Combined, these systems generated nearly 1.1 million kWh during January through March. The project`s cumulative generation now stands at 8.2 million kWh. Key cumulative 1996 results are listed in the following table. The locations of systems other than Davis are noted alongside the supplier`s name.

NONE

1996-07-01T23:59:59.000Z

388

Quarterly Coal Report, October-December 1997  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October-December 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Project Leader, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

389

Quarterly Coal Report October-December 2000  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October-December 2000 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Betsy O'Brien, Director, Coal, Electric and Renewables Division, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section

390

Quarterly Coal Report October-December 1996  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October-December 1996 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Acting Chief, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Specific information about

391

Quarterly Coal Report, January-March 1998  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1998 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Project Leader, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

392

Quarterly Coal Report, January-March 1997  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Acting Chief, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

393

Quarterly Coal Report January-March 1996  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1996 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Noel C. Balthasar, Chief, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Electric and Alter- nate Fuels. Specific information about

394

Quarterly Coal Report, July-September 1997  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Distribution Category UC-950 Quarterly Coal Report July-September 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Project Leader, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

395

Hydrogen engine performance analysis project. Quarterly report  

DOE Green Energy (OSTI)

The objective of this project is to address the problems identified in order to obtain the data-base covering performance, operational characteristics and emissions essential for making a rational decision regarding the selection and design of prototype hydrogen-fueled, air-breathing engines capable of being manufactured for general automotive use. The project program plan calls for investigation of pre-intake valve closing fuel ingestion (Pre IVC) hydrogen-fueled engines during the first two of the three year project. With Pre IVC engines the fuel is introduced into the combustion chamber prior to closing of the intake valve. This is in contrast to Post IVC engines in which fuel is introduced in the cylinder after the intake valve closes. Post IVC engines are to be investigated during the third year according to the project program plan. This quarterly report is a summary of the work accomplished during the first three months of the project.

Adt, R.R. Jr.; Swain, M.R.

1977-03-01T23:59:59.000Z

396

Lessons Learned Quarterly Report, December 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2007 Lessons Learned Quarterly Report, December 2007 Lessons Learned Quarterly Report, December 2007 Welcome to the 53rd quarterly report on lessons learned in the NEPA process. Many in the Department's NEPA Community were called on to give extraordinary time and resources to the preparation of key EISs issued recently and highlighted in this LLQR. We anticipate a busy 2008 as well. As always, we welcome your suggestions for further improvement. Included in this issue: Multiple, Complex EISs Support DOE Missions; What Will the New Year Bring? Consideration of Greenhouse Gas Emissions in DOE NEPA Documents Is Evolving OMB and OSTP Issue Risk Analysis Principles Feature: Key EISs Yucca Mountain EISs Clean Coal EISs Western Energy Corridors Programmatic EIS FONSI Not a Foregone Conclusion

397

Lessons Learned Quarterly Report, September 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2013 Lessons Learned Quarterly Report, September 2013 Lessons Learned Quarterly Report, September 2013 In this issue, we highlight DOE's NEPA performance metrics, including a historical perspective. As DOE NEPA practitioners strive to control time and cost while maintaining quality, this most recent NEPA metrics analysis shows that overall performance generally appears to have remained stable, notwithstanding a substantial workload. Articles in this issue include: 10 Years of NEPA Metrics: 2003-2012 DOE-wide NEPA Contracts Update Historical Perspective on EIS Completion Times Responding to Comments NEPA Search Tool NAEP Abstracts, Nominations Document Managers and CORs Eating the NEPA Elephant Web-based Scoping Meeting A Summer with NEPA Stakeholders Directory EAs and EISs Completed This Quarter

398

Quarterly Nuclear Deployment Summary, April 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Summary, April 2012 Quarterly Nuclear Deployment Summary, April 2012 Quarterly Nuclear Deployment Summary, April 2012 April 30, 2012 - 12:31pm Addthis Quarterly Nuclear Deployment Summary The U.S. NRC voted to approve the issuance of the COLs for Southern Nuclear's Vogtle Units 3 and 4 on February 9, 2012. The issuance marks the first COL ever to be issued and the construction of a new nuclear power plant in more than 30 years. SCE&G's V.C Summer Units 2 and 3 received approval for COLs on March 30, 2012, making them the second US new-build in 30 years. The Tennessee Valley Authority has revised the cost and time estimates of Unit 2 at the Watts Bar Nuclear Plant. The new schedule estimates the cost to be in the range of $4 billion with a completion date of late 2015. South Mississippi Electric Power Association (SMEPA) has signed a

399

Lessons Learned Quarterly Report, September 1995 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1995 September 1995 Lessons Learned Quarterly Report, September 1995 This quarterly report summarizes the lessons learned for documents completed between April 1 and June 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs. The report includes a Question and Answer section as well as guidance on selected topics. REPORT CONTENTS: NEPA Document Preparation Times NEPA Cost Data NEPA Document Content The Document Preparation Process Effectiveness of the NEPA Process Other Lessons Learned Lessons Learned Questions and Answers EISs Completed 3rd Quarter FY 1995 EAs Completed 3rd Quarter FY 1995

400

Quarterly Nuclear Deployment Summary, January 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Summary, January 2012 Quarterly Nuclear Deployment Summary, January 2012 Quarterly Nuclear Deployment Summary, January 2012 January 30, 2012 - 1:10pm Addthis Quarterly News The U.S. NRC voted to approve the amended AP1000 design certification on December 22, 2011. The Commission also announced the rule would be effective immediately after it was published in the Federal Register on December 30, 2011. A final rule for the GE-ABWR design certification amendment was approved and published in the Federal Register on December 16, 2011. The rule will become effective January 17, 2012. The condenser for Vogtle Unit 3 has been completed by Japan's Toshiba and began its journey from Sacheon to Savannah, Georgia on November 21. The condenser marks the first major component Toshiba has shipped for

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Lessons Learned Quarterly Report, December 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2002 Lessons Learned Quarterly Report, December 2002 Lessons Learned Quarterly Report, December 2002 Welcome to the 33rd quarterly report on lessons learned in the NEPA process. Have you noticed that NEPA has been in the news a lot lately? Although this issue of LLQR is longer than usual, I encourage you to read all the news, views, and lessons learned. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: CEQ Asks How to Improve NEPA Implementation; Responses Vary Widely DOE Cooperating Agency Report DOE Proposes Floodplain/Wetland Rule Revisions Adaptive Management and the NEPA Process Impact Mitigation at Los Alamos Institute Establishes NEPA Advisory Committee Office of Science Promotes Early NEPA Planning

402

Lessons Learned Quarterly Report, December 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2005 Lessons Learned Quarterly Report, December 2005 Lessons Learned Quarterly Report, December 2005 Welcome to the 45th quarterly report on lessons learned in the NEPA process. We thank all those who participated in the NEPA 35 conference. You made it successful. We hope you are as inspired as we are by the spirit of NEPA Section 101and the challenge to improve the implementation of NEPA. As always, we welcome your suggestions for continuous improvement. Articles included in this issue: NEPA 35: Back to Basics, Back to the Future Congressional NEPA Task Force Holds Final Hearings NEPA 35 Conference Highlights CEQ Chairman Connaughton's Keynote Address Plenary Sessions NECRAC Final Report Environmental Justice and Indian Country Training Sesssions Breakout Sessions

403

EDIN-USVI Clean Energy Quarterly | Open Energy Information  

Open Energy Info (EERE)

EDIN-USVI Clean Energy Quarterly EDIN-USVI Clean Energy Quarterly Jump to: navigation, search Name EDIN-USVI Clean Energy Quarterly Agency/Company /Organization National Renewable Energy Laboratory Sector Energy, Water Focus Area Buildings, Energy Efficiency - Utility, Economic Development, Energy Efficiency, Grid Assessment and Integration, People and Policy, Transportation, Renewable Energy, Biomass, Solar, - Solar Hot Water, - Solar Pv, Biomass - Waste To Energy, Wind Phase Bring the Right People Together, Evaluate Options, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Free; publicly available Website http://www.edinenergy.org/usvi Locality U.S. Virgin Islands References EDIN-USVI Clean Energy Quarterly[1] Contents 1 Overview 2 Highlights

404

Lessons Learned Quarterly Report, June 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2005 Lessons Learned Quarterly Report, June 2005 Lessons Learned Quarterly Report, June 2005 Welcome to the 43rd quarterly report on lessons learned in the NEPA process. In this issue we take a look at our hard-working NEPA Compliance Officers, who share bits of wisdom (and a little humor) gained from their lessons learned implementing NEPA. Countless thanks to all NCOs for their dedication, flexibility, and perseverance. As always, we welcome your suggestions for continuous improvement. Articles in this issue include: Who Has More Than 500 Years of NEPA Experience? A Closer Look at the DOE NEPA Compliance Officers CEQ Asks Federal Agencies to Lead NEPA Modernization Congressional NEPA Task Force Earth Day 2005 EPA Rates Action Alternatives in Moab EIS Update on Cape Wind Project

405

Lessons Learned Quarterly Report, December 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2006 Lessons Learned Quarterly Report, December 2006 Lessons Learned Quarterly Report, December 2006 Welcome to the 49th quarterly report on lessons learned in the NEPA process. In this issue, we feature the initiation of three significant EISs: the Complex 2030 Supplemental Programmatic EIS, the Supplemental Yucca Mountain Repository EIS, and the expanded Yucca Mountain Rail EIS. As always, we welcome your suggestions for continuous improvement. Articles included in this issue: NNSA Pursues Complex 2030 Vision Through Supplemental Programmatic EIS Scoping Process Underway for Two Yucca Mountain EISs Address Sabotage and Terrorism in EISs and EAs Special Environmental Analysis for Emergency Actions CEQ Work Groups Develop NEPA Guidance EIS Study Emphasizes Need for Quality and Clarity

406

Lessons Learned Quarterly Report, March 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2007 Lessons Learned Quarterly Report, March 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the NEPA process. The Office began by presenting cost and time metrics and "What Worked and What Didn't Work." Other features were soon introduced. As always, we hope you read all of LLQR, and we welcome your suggestions for further improvement. Articles included in this issue: Flexibility of NEPA Process Facilitates Decisions for Strategic Petroleum Reserve Expansion DOE Cooperating Agency Report to CEQ GNEP PEIS to Examine Nuclear Fuel Recycling Proposal

407

Lessons Learned Quarterly Report, June 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2008 Lessons Learned Quarterly Report, June 2008 Lessons Learned Quarterly Report, June 2008 Welcome to the 55th quarterly report on lessons learned in the NEPA process. We are pleased to feature the recent NAEP conference, Changing Climates, thanks to our on-the-scene reporter Carolyn Osborne. There are also several articles related to global climate change and NEPA. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for further improvement. Articles included in this issue: Old NEPA Tools Still Work in a "Changing Climate" September Meeting: Making NEPA Work for DOE Strategic Petroleum Reserve Scoping Underappreciated Provisions of the CEQ Regulations CEQ Interagency Work Groups Make Progress

408

Program Update: 1st Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1st Quarter 2013 1st Quarter 2013 Program Update: 1st Quarter 2013 Inside this Update: Abandoned Uranium Mines Report to Congress: LM Wants Your Input; LM Discusses Management of LTS&M Records; LM Launches New Website Under energy.gov; Biological Monitoring at Amchitka Appears to Show Impacts from Fukushima Dai-ichi Incident; Completion of the CERCLA Natural Resource Damage Process at the Rocky Flats Site; Environmental Justice Activities; Mound Museum Volunteers: Preserving a Laboratory's Legacy; DOE Evaluates Environmental Impacts of Uranium Mining on Government Land in Western Colorado; Solar Photovoltaic System at Tuba City Site; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during

409

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 Cameco Crow Butte Operation Dawes, Nebraska 1,000,000 Operating Operating Operating Operating Hydro Resources, Inc. Church Rock McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Hydro Resources, Inc. Crownpoint McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Lost Creek ISR, LLC, a subsidiary of Ur- Energy USA Inc. Lost Creek Project Sweetwater, Wyoming 2,000,000 Under Construction Under Construction

410

Lessons Learned Quarterly Report, June 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Welcome to the 59th quarterly report on lessons learned in the NEPA process. We are pleased to feature the DOE NCO meeting and the NAEP annual conference, where streamlining the NEPA process for Recovery Act projects and consideration of climate change in NEPA documents were both addressed. We've begun to follow up on suggestions from the NCO meeting (below). Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NEPA Compliance Officers Share Strategies 2009 NCO Meeting: Expediting a Quality NEPA Process Expedite Schedule and Maintain Quality Preparing Focused, Concise EAs

411

Lessons Learned Quarterly Report, September 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2003 Lessons Learned Quarterly Report, September 2003 Lessons Learned Quarterly Report, September 2003 Welcome to the 36th quarterly report on lessons learned in the NEPA process. We are pleased to feature the July 2003 NEPA Community Meeting in this issue. Also, please note that the cumulative index, a useful reference tool, is printed in this issue. Thank you for your continuing support of the Lessons Learned program. Included in this issue: DOE NEPA Community Gauges Progress In Its Continuing Pursuit of Excellence Floodplain and Wetland Regulations Effective September 26, 2003 NEPA Community Meeting Highlights Metrics Show Progress In Meeting Goals Getting from Here to There Lessons Learned Along the Way e-Government Approaches to EIS Distribution Procedures Evolving for Sensitive Information

412

Lessons Learned Quarterly Report, June 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 1997 Lessons Learned Quarterly Report, June 1997 Lessons Learned Quarterly Report, June 1997 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: DOE-wide NEPA Contracts Will Be Ready to Use Soon! CEQ Initiative on NEPA Implementation DOE Submits Comments on CEQ Environmental Justice Guidance NEPA Order to Be Reissued with Conforming Changes DOE Sued on Stockpile Stewardship and Waste Management PEISs Effective NEPA Hearings Bob Strickler and Linda Thurston Retire Reminder about Stakeholder Notification Litigation Updates New Executive Order on Protecting Children from Environmental Risks Annual NEPA Planning Summaries What's New with Electronic NEPA Questionnaire Results Other Completed EIS-Related Documents

413

Lessons Learned Quarterly Report, September 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Welcome to the 60th quarterly report on lessons learned in the NEPA process. We are pleased to feature the extraordinary support provided by our NCO volunteers and to introduce Scott Blake Harris, DOE General Counsel, and his plans for improving the DOE NEPA process. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NCO Volunteers Lend a Hand To Expedite Recovery Act Projects DOE General Counsel Scott Blake Harris Aims To Improve the NEPA Review Process CEQ Report to Congress on Recovery Act DOE Grants NEPA Variances for Two Solicitations Introducing DOE's New General Counsel

414

Lessons Learned Quarterly Report, March 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2010 Lessons Learned Quarterly Report, March 2010 Lessons Learned Quarterly Report, March 2010 Welcome to the 62nd quarterly report on lessons learned in the NEPA process. In this issue, we start a year-long observance of the 40th anniversary of the National Environmental Policy Act. The occasion calls for celebration of NEPA's successes as well as reflection on opportunities for improvement. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: CEQ Celebrates NEPA at 40. . . and So Do We! DOE Launches Categorical Exclusion Database Celebrating 40 Years with NEPA CEQ Issues Draft NEPA Guidance CEQ NEPA Symposium Presidential Proclamation Reflections: Professor Mandelker

415

Lessons Learned Quarterly Report, September 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, September 2012 This issue features suggestions from experienced NEPA practitioners on ways to meet Secretary Chu's challenge to make better use of existing tools and integrate project management with NEPA compliance. Articles in this issue include: Secretary's Memorandum Key Principles OLC Training Suggestions from NETL Effective EIS Management Teams EPA Requires Electronic EIS Filing 2012 DOE NEPA Stakeholders Directory DOE-wide NEPA Contracts Update GIS Tools for the NEPA Practitioner CEQ Cooperating Agency Report NEPA Office Summer Interns Transitions Appeals Court Upholds BELLA EA Using Social Media for NEPA NNSA Webcast SPD SEIS Hearing EAs and EISs Completed This Quarter Questionnaire Results

416

Lessons Learned Quarterly Report, March 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Welcome to the 38th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Included in this issue: New, Improved "Green Book" Is on the Way Modern Pit Facility Final EIS Delayed NNSA Withdraws FONSI for LANL Biosafety Lab BLM Programmatic EIS On Wind Energy Lesson Learned about Schedule and Teamwork CEQ Chair Emphasizes NEPA's "Productive Harmony" Goal Supporting Flexible Decisionmaking in Practice NEPA Champions Brief Congressional Staff

417

Lessons Learned Quarterly Report, March 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Welcome to the 34th quarterly report on lessons learned in the NEPA process. We are pleased to feature the synergy between NEPA and the new DOE Order 450.1, Environmental Protection Program. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: New DOE Order Focuses on EMS, Supports Basic NEPA Principles Few Comments Received on Proposed Floodplain/Wetlands Rule Changes China's Environmental Impact Assessment Law DOI/Forest Service Proposed Categorical Exclusions Potential Resources for NEPA Practitioners A View from the Trenches Fossil Energy Launches EIS Process Improvement Team CEQ Updates EIS Distribution Saves Yucca Mountain Project $200,000

418

Lessons Learned Quarterly Report, June 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2003 Lessons Learned Quarterly Report, June 2003 Lessons Learned Quarterly Report, June 2003 Welcome to the 35th quarterly report on lessons learned in the NEPA process. We are pleased to include in this issue three new mini-guidance articles. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: Responding to Comments Is Work, But It Makes the NEPA Process Work DOE NEPA Meeting in July Mini-guidance: Multiple RODs Offer Flexibility Effective and Efficient EIS Distribution Keep the Public Informed When EIS Plans Change DOE Updates Public Participation Policy Observations on Annual NEPA Planning Summaries DOE-Wide NEPA Contracts Guidance Issued Not Meeting CAA Requirements Can Cause Delays Floodplain and Wetland Regulations Update

419

Lessons Learned Quarterly Report, September 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Welcome to the 28th quarterly report on lessons learned in the NEPA process. This completes our seventh year of providing performance metrics, news, and guidance to the DOE NEPA Community. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Compliance Officers Consider Further Improvements NCO Meeting Federal/State/Tribal Coordination Forest Fire; Forest Preserved View From EPA Streamlining Approvals of Energy Projects NEPA Pilot Projects to Demonstrate Mediation DOE-wide NEPA Contracting Executive Order on Migratory Birds FERC Outreach for Natural Gas Approvals Life-Cycle Assessment for "Green" Projects

420

U.S. Energy Information Administration | Quarterly Coal Report...  

U.S. Energy Information Administration (EIA) Indexed Site

U.S. Coal Imports by Origin, 2007 - 2013 (thousand short tons and dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Table 6....

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

U.S. Energy Information Administration | Quarterly Coal Report...  

U.S. Energy Information Administration (EIA) Indexed Site

1. U.S. Coal Summary Statistics, 2007 - 2013 (thousand short tons) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Table ES-1. U.S. Coal Summary...

422

Oil Bypass Filter Technology Evaluation Ninth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Background on prior quarterly reports * Bus mileage and performance status * Used engine-oil disposal costs * Unscheduled oil change * Light-duty vehicle test status Oct 3-Dec 3...

423

Oil Bypass Filter Technology Evaluation Eighth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Background on prior quarterly reports * Bus mileage and performance status * Used engine-oil disposal costs * Unscheduled oil change * Light-duty vehicle test status Oct 3-Dec 3...

424

Oil Bypass Filter Technology Evaluation - Tenth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INLEXT-05-00381 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Tenth Quarterly Report January-March 2005 TECHNICAL...

425

Oil Bypass Filter Technology Evaluation - Third Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-03-00974 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Third Quarterly Report April-June 2003 Larry Zirker James...

426

Oil Bypass Filter Technology Evaluation - Ninth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INLEXT-05-00040 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Ninth Quarterly Report October-December 2004 TECHNICAL...

427

Natural gas: Imports and exports third quarter report 1993  

Science Conference Proceedings (OSTI)

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies with authorizations to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the third quarter of 1993 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months (October 1992--September 1993). Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

Not Available

1993-12-31T23:59:59.000Z

428

US energy industry financial developments, 1993 first quarter  

Science Conference Proceedings (OSTI)

Net income for 259 energy companies-- including, 20 major US petroleum companies-- rose 38 percent between the first quarter of 1992 and the first quarter of 1993. An increased level of economic activity, along with colder weather, helped lift the demand for natural gas. crude oil, coal, and electricity. The sharp rise in the domestic price of natural gas at the wellhead relative to the year-ago quarter was the most significant development in US energy during the first quarter. As a consequence of higher natural gas prices, the upstream segment of the petroleum industry reported large gains in income, while downstream income rose due to higher refined product demand. Increased economic activity and higher weather-related natural gas demand also led to improvements in income for the rate-regulated energy segment. However, declining domestic oil production continued to restrain upstream petroleum industry earnings growth, despite a moderate rise in crude oil prices.

Not Available

1993-06-25T23:59:59.000Z

429

Natural Gas Imports and Exports - Fourth Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 More Documents & Publications FE DOCKET NO. 11-59-LNG Summary of LNG Export Applications LNG Annual Report - 2011...

430

Natural gas imports and exports. Second quarter report, 1998  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepared quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1998 (April through June). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-11-01T23:59:59.000Z

431

Natural gas imports and exports. Fourth quarter report, 1998  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

432

Natural gas imports and exports: Third quarter report, 1998  

Science Conference Proceedings (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the third quarter of 1998 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent calendar quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

433

Natural gas imports and exports. First quarter report, 1998  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the first quarter of 1998 (January through March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-08-01T23:59:59.000Z

434

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance  

Office of Legacy Management (LM)

Calendar Year 2013 October 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd...

435

Interventions into old residential quarters : the case of Shahjahanabad  

E-Print Network (OSTI)

The thesis develops design guidelines for interventions into residential quarters of the old core cities in the Third World. Their purpose is to provide a suitable framework for developing residential designs maintaining ...

Badshah, Akhtar

1983-01-01T23:59:59.000Z

436

Lessons Learned Quarterly Report, June 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, June 2004 Welcome to the 39th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Articles included in this issue: "Open House" Format for Scoping Meetings Provides DOE Valuable Input for Yucca Rail EIS Lesson Learned from Lessons Learned Apply Common Sense: Reduce Unfamilar Abbreviations Carbon Sequestration Programmatic EIS The Libyan Connection: Emergency Action Needed NEPA Strategy Adjusts to Changing Circumstances Card Game Highlights Diversity at NEPA Clinic

437

Lessons Learned Quarterly Report, September 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2004 Lessons Learned Quarterly Report, September 2004 Lessons Learned Quarterly Report, September 2004 Welcome to the 40th quarterly report on lessons learned in the NEPA process. That's 40 issues! Have you read them all? We are pleased to feature the July 2004 NEPA Community Meeting in this issue, as well as our annual update of the cumulative index to LLQR. Thank you for your continuing support. Articles included in this issue: DOE's NEPA Process - Getting Better and Better NEPA Community Meeting Highlights Awards for Contributions to DOE's NEPA Program Working with Cooperating Agencies e-NEPA Improves Access and Efficiency Getting Better Through Guidance More Thoughts on Getting Better and Better NEPA Office Shares Best Practices Lessons Learned from Lessons Learned Part 4

438

Treatment of metal-laden hazardous wastes with advanced clean coal technology by-products. Quarterly report, March 30, 1996--June 30, 1996  

SciTech Connect

Progress is described on the use of by-products form clean coal technologies for the treatment of hazardous wastes. During the third quarter of Phase 2, work continued on evaluating Phase 1 samples (including evaluation of a seventh waste), conducting scholarly work, preparing for field work, preparing and delivering presentations, and making additional outside contacts.

Cobb, J.T. Jr.; Neufeld, R.D.; Blachere, J.R. [and others

1998-04-01T23:59:59.000Z

439

Chemical vapor deposition growth. Quarterly report No. 1  

DOE Green Energy (OSTI)

The activities of the first quarter of the contract, which began December 29, 1975, are described. An existing laboratory-type CVD reactor system with a vertical deposition chamber has been used for growth of the Si films studied to date. Extensive modifications of this system, involving mass flow controllers and automatic timing of reactant gas flows by means of solenoid-activated air-operated bellows valves, will be completed early in the second quarter. (WDM)

Ruth, R.P.; Manasevit, H.M.; Kenty, J.L.; Moudy, L.A.; Simpson, W.I.; Yang, J.J.

1976-03-31T23:59:59.000Z

440

A QUARTER CENTURY OF NUCLEAR WASTE MANAGEMENT IN JAPAN  

Science Conference Proceedings (OSTI)

This paper is entitled ''A QUARTER CENTURY OF NUCLEAR WASTE MANAGEMENT IN JAPAN''. Since the first statement on the strategy for radioactive waste management in Japan was made by the Atomic Energy Commission (AEC) in 1976, a quarter century has passed, in which much experience has been accumulated both in technical and social domains. This paper looks back in this 25-year history of radioactive waste management in Japan by highlighting activities related to high-level radioactive waste (HLW) disposal.

Masuda, S.

2002-02-25T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

55th Lessons Learned Quarterly Report, June 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 1 08 1 Second Quarter FY 2008 June 2, 2008; Issue No. 55 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A September Meeting: Making NEPA Work for DOE Old NEPA Tools Still Work in a "Changing Climate" With the support of David Hill, DOE General Counsel, planning for the next DOE NEPA Community meeting is underway!

442

Quarterly report to U. S. House and Senate Committees on Appropriations (3rd). Quarterly report Jun-Sep 76  

SciTech Connect

This is the third in a series of quarterly reports to the House and Senate Committees on Appropriations describing the process of the Federal Energy Administration's (FEA) energy conservation programs and short- and long-term accomplishments.

1977-01-01T23:59:59.000Z

443

Great Plains Coal Gasification project. Quarterly environmental report, third quarter, 1985  

Science Conference Proceedings (OSTI)

Environmental monitoring, supplemental environmental programs and quality assurance/quality control activities are covered in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; and environmental incident summary. The supplemental environmental program covers: performance survey; wastewater control and steam generation system; sulfur control; tar reinjection outage; gasifier effluent control systems; toxicity screening study; toxicant characterization; data base management system; workplace characterization; fugitive emissions; epidemiology; atmospheric program; effects of cooling tower effluents on terrestial ecosystems; and contingency program. 15 figs., 56 tabs.

Not Available

1985-10-01T23:59:59.000Z

444

Great Plains coal gasification project. Quarterly technical progress report, first quarter 1986. [Lurgi Process  

SciTech Connect

Environmental monitoring, supplemental enviornmental programs, and quality assurance/quality control activities are covered in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; environmental incident summary; and regulatory environmental inspections. The supplemental environmental program covers: performance survey; wastewater control and steam generation system; sulfur control; tar reinjection outage; gasifier effluent control system; toxicity screening study; toxicant characterization; data base management system; workplace characterization; fugitive emissions; epidemiology; atmospheric program; effects of cooling tower effluents on terrestrial ecosystems; and contingency program.

Not Available

1986-04-01T23:59:59.000Z

445

Great Plains Coal Gasification Project. Quarterly environmental report, fourth quarter 1985  

Science Conference Proceedings (OSTI)

Environmental monitoring, supplemental environmental programs and quality assurance/quality control activities are covered in this quarterly report. Under the environmental monitoring program, the following topics are covered: permitting activities; ambient monitoring; plant discharge monitoring; pollution control unit emissions; surface mining and reclamation; and environmental incident summary. The supplemental environmental program covers: performance survey; wastewater control and steam generation systems; sulfur control; tar reinjection outage; gasifier effluent control systems; toxicity screening study; toxicant characterization; data base management system; workplace characterization; fugitive emissions; epidemiology; atmospheric program; effects of cooling tower effluents on terrestial ecosystems and contingency program. 14 figs., 66 tabs.

Not Available

1986-01-01T23:59:59.000Z

446

Heat Pipe Technology, a bibliography with abstracts, quarterly update. Quarterly report No. 3  

SciTech Connect

Heat Pipe Technology is a continuing bibliographic summary of research on the subject of the heat pipe. The first volume was published in the spring of 1971 and is cumulative through March of that year. The 1971, 1972, 1973 and 1974 Annual Supplements have been published and distributed. Additional copies are available from the Technology Application Center. This update to Heat Pipe Technology cites the additional references identified during July, August, and September of 1975. It is the third in a 1975 quarterly series intended to provide 'current awareness' to heat pipe researchers. No Heat Pipe related patents were included in this issue.

1975-09-30T23:59:59.000Z

447

Great Plains Coal Gasification Project. Quarterly technical progress report, second quarter 1986. [Lurgi process  

SciTech Connect

The operations of the Great Plains coal gasification plant are reported for the second quarter of 1986. The following areas are covered: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) on-stream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications - 1986 budget; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical services; (12) environmental executive summary; and (13) quality assurance/quality control activities. (AT)

Not Available

1986-07-31T23:59:59.000Z

448

Great Plains coal gasification project: Quarterly technical progress report, Third quarter 1986. [Lurgi process  

Science Conference Proceedings (OSTI)

Accomplishments for the third quarter of 1986 are presented for the Great Plains coal gasification plant. The following areas are discussed: (1) lignite coal production; (2) SNG production; (3) SNG gas quality; (4) by-products production and inventories; (5) onstream factors; (6) raw material, product and by-product consumption and energy consumption for plant operations; (7) plant modifications - 1986 budget; (8) plant maintenance; (9) safety; (10) industrial hygiene; (11) medical services; (12) environmental executive summary; and (13) quality assurance/quality control activities.

Not Available

1986-10-31T23:59:59.000Z

449

EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)  

SciTech Connect

The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.; Carper, Ross R.; Wiley, Julie G.; Beckman, Mary T.

2010-04-20T23:59:59.000Z

450

Synthesis of acrylates. Quarterly report, 1996  

SciTech Connect

Over the last quarter, Eastman has completed its experimental program on propionyl generation portion of the process. An improved olefin carbonylation process has been developed as the basis of the propionate synthesis portion of the project (Task 1). Bechtel has also completed a production cost estimate for the synthesis of propionic anhydride from ethylene, carbon monoxide, and recycled propionic acid based on the yields demonstrated for the Eastman carbonylation process. The results show a cost of $0.43/lb, which we judge to be competitive as a basis for MMA, which sells for about $0. 75/lb. RTI has tested (Task 2) over 71 acid-base catalysts for the condensation of propionic anhydride/acid with formaldehyde. Other catalysts are being tested to minimize the deactivation observed on these materials. These catalysts are more likely than the V-Si-P catalysts as potential candidates for a commercial process. RTI has also completed the assembly and operation of a HTHP slurry reactor system for demonstration of liquid phase synthesis (Task 3). NCSU has tested slurry fluids including decalin and tetralin for hydrothermal, oxidative, and reductive stability. The results of their effort will be directly applicable to bench-scale testing in the RTI HTHP slurry reactor.

NONE

1996-07-01T23:59:59.000Z

451

Crime in England and Wales: Quarterly Update  

E-Print Network (OSTI)

interviewed in the 12 months to September 2002, had been the victim of one or more crimes over the previous 12 months. This compares with 27.6 per cent in 2000 (from the 2001 BCS), which means that the risk of becoming a victim of crime remains historically low, around the same as the first BCS in 1982 (crime in 1981). 2. The total number of crimes recorded by the police in the 12 months to September 2002 was 5.8 million, an increase of nine per cent over the previous 12 months. This period has witnessed significant changes in police recording practice as a result of the implementation of the National Crime Recording Standard (NCRS) [see box below]. After accounting for these, the increase is estimated to be two per cent. 3. The latest quarterly recorded crime figures give a better impression of the most recent trends. They show a nine per cent rise in July-September 2002 over July-September 2001. All of this is accounted for by the recording changes, and the underlying trend is estima

Months To September; David Povey; Charlotte Ellis; Sian Nicholas

2003-01-01T23:59:59.000Z

452

Natural gas conversion process. Sixth quarterly report  

Science Conference Proceedings (OSTI)

The experimental apparatus was dismantled and transferred to a laboratory space provided by Lawrence Berkeley Laboratory (LBL) which is already equipped with a high-ventilation fume hood. This will enable us to make tests at higher gas flow rates in a safe environment. Three papers presented at the ACS meeting in San Francisco (Symposium on Natural Gas Upgrading II) April 5--10, 1992 show that the goal of direct catalytic conversion of Methane into heavier Hydrocarbons in a reducing atmosphere is actively pursued in three other different laboratories. There are similarities in their general concept with our own approach, but the temperature range of the experiments reported in these recent papers is much lower and this leads to uneconomic conversion rates. This illustrates the advantages of Methane activation by a Hydrogen plasma to reach commercial conversion rates. A preliminary process flow diagram was established for the Integrated Process, which was outlined in the previous Quarterly Report. The flow diagram also includes all the required auxiliary facilities for product separation and recycle of the unconverted feed as well as for the preparation and compression of the Syngas by-product.

Not Available

1992-12-01T23:59:59.000Z

453

(Great Plains Coal Gasification Project): Quarterly environmental, safety, and medical report, first quarter 1988  

Science Conference Proceedings (OSTI)

The following brief synopsis is provided of the status of Environmental, Safety and Medical Programs described in the First Quarter 1988 Report. Tabular summaries of environmental QA/QC results and planned next quarter activities are presented in Sections 2.0 and 3.0, respectively. ANG continued permitting activity during the reporting period. These activities include reviewing the revised RCRA Part B application; receiving approval to discharge high temperature, low pressure steam condensate to the stormwater system; receiving approval to expand the current gasifier ash pit; submitting the results of the EPA laboratory audit samples; finalizing the contract for the Deepwell No. 1 and No. 2 work to comply with UIC-101; monitoring the progress of the cooling tower surge pond B liner leaks; receiving approval to delete several parameters in the Interim Groundwater Monitoring Plan; responding to an EPA Hazardous Waste Questionnaire and a CERCLA site assessment for DOE; submitting the DOE-assigned section for the Modified Permit Application; and submitting the first annual chemical inventory report to comply with Section 312 of SARA. ANG conducted eight monitoring programs in the vicinity of the Great Plains facility. The RAMP network consists of five monitoring sites, and it is designed to monitor meteorology and air quality in the vicinity of the Great Plains facility and the Antelope Valley and Coyote electric generating stations. ANG conducts ambient monitoring for H/sub 2/S at one site in the vicinity of the Great Plains facility. 15 figs., 49 tabs.

Not Available

1988-05-01T23:59:59.000Z

454

Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement  

Science Conference Proceedings (OSTI)

The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

NONE

1994-03-31T23:59:59.000Z

455

Natural gas imports and exports. First quarter report 1994  

Science Conference Proceedings (OSTI)

The Office of Fuels Programs Prepares quarterly reports Summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the first quarter of 1994 (January--March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During the first three months of 1994, data indicates that gas imports grew by about 14 percent over the level of the first quarter of 1993 (668 vs. 586 Bcf), with Canadian and Algerian imports increasing by 12 and 53 percent, respectively. During the same time period, exports declined by 15 percent (41 vs. 48 Bcf). Exports to Canada increased by 10 percent from the 1993 level (22 vs. 20 Bcf) and exports to Mexico decreased by 64 percent (5 vs. 14 Bcf).

Not Available

1994-08-01T23:59:59.000Z

456

Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement  

SciTech Connect

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1994-12-31T23:59:59.000Z

457

BIO-ORGANIC CHEMISTRY QUARTERLY REPORT. December 1962 through February 1963  

E-Print Network (OSTI)

Contract No. W -7405-eng-48 BIO-ORGANIC CHEMISTRY QUARTERLY25, D.C. UCRL- 10743 b BIO-ORGANIC CHEMISTRY QUARTERLYH. K. Lichtenthaler , in Bio -Organic Chemistry Quarterly

Various

1963-01-01T23:59:59.000Z

458

OE Releases 2013 Issue 2 of Energy Emergency Preparedness Quarterly (April 2013)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Electricity Delivery and Energy Reliability (OE) has released Volume 2, Issue 2 of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter.

459

U.S. rail carloads of coal in first quarter of 2012 lowest ...  

U.S. Energy Information Administration (EIA)

Total U.S. carloads of coal by rail during the first quarter of 2012 fell to 1.55 million carloads, the lowest level for any quarter since the ...

460

Great Plains Coal Gasification Project, Mercer County, North Dakota. Quarterly technical and environmental report, second quarter, 1984. [Mercer County, North Dakota  

SciTech Connect

Project activities remain on schedule to meet Great Plains Gasification Associates' full gas production date. Detailed engineering is complete for the gasification plant. The only remaining engineering tasks involve field support activities and special projects. Construction is nearly complete. The majority of the remaining tasks involve civil, painting and electrical work. Start-up operations are proceeding very well. Many significant achievements were accomplished during the quarter. Coal was successfully gasified with oxygen. All of the first train's seven gasifiers completed successful production test runs. The only remaining plant permit is the Permit to Operate, which is expected to be issued in late 1985. Quality assurance/quality control activities included major equipment inspections, development of welding procedures and equipment turnover inspections. Freedom Mine development activities remain on schedule.

Not Available

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update No.5, October-December 2004  

DOE Green Energy (OSTI)

Fifth issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2005-02-01T23:59:59.000Z

462

National Bioenergy Center Sugar Platform Integration Project Quarterly Update: April/June 2004, No.3  

DOE Green Energy (OSTI)

Third issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2004-07-01T23:59:59.000Z

463

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update No.6, January-March 2005  

DOE Green Energy (OSTI)

Sixth issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project

Not Available

2005-04-01T23:59:59.000Z

464

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update, January/March 2004, No.2  

DOE Green Energy (OSTI)

Second issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2004-05-01T23:59:59.000Z

465

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #13, October-December 2006  

DOE Green Energy (OSTI)

Volume 13 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

Schell, D. J.

2007-01-01T23:59:59.000Z

466

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #7, April-June 2005  

DOE Green Energy (OSTI)

Volume 7 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Not Available

2005-07-01T23:59:59.000Z

467

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update, Issue No.1, October-December 2003  

DOE Green Energy (OSTI)

First issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project.

Not Available

2004-03-01T23:59:59.000Z

468

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update, July/September 2004, No.4  

DOE Green Energy (OSTI)

Fourth issue of a quarterly reporting to stakeholders on progress on the National Bioenergy Center Sugar Platform Integration Project

Not Available

2004-10-01T23:59:59.000Z

469

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #11, April-June 2006  

DOE Green Energy (OSTI)

Volume 11 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2006-07-01T23:59:59.000Z

470

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #8, July-September 2005  

Science Conference Proceedings (OSTI)

Volume 8 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2005-10-01T23:59:59.000Z

471

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #21, October - December 2008  

SciTech Connect

October to December, 2008 edition of the National Bioenergy Center?s Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-01-01T23:59:59.000Z

472

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #9, October-December 2005  

DOE Green Energy (OSTI)

Volume 9 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D. J.

2006-01-01T23:59:59.000Z

473

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #10, January-March 2006  

DOE Green Energy (OSTI)

Volume 10 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Not Available

2006-04-01T23:59:59.000Z

474

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #14, January - March 2007  

DOE Green Energy (OSTI)

Volume 14 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

Schell, D.

2007-04-01T23:59:59.000Z

475

National Bioenergy Center Biochemical Platform Process Integration Project: Quarterly Update #18, January-March 2008  

DOE Green Energy (OSTI)

January-March, 2008 edition of the quarterly update for the National Bioenergy Center's Biochemical Platform Integration Project.

Schell, D.

2008-04-01T23:59:59.000Z

476

Pulsed atmospheric fluidized bed combustion. Quarterly technical progress report, October--December 1993  

Science Conference Proceedings (OSTI)

This quarterly report consist almost entirely of engineering drawings of the proposed pulse fluidized-bed combustor.

Not Available

1994-01-31T23:59:59.000Z

477

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #12, July-September 2006  

DOE Green Energy (OSTI)

Volume 12 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2006-10-01T23:59:59.000Z

478

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009  

SciTech Connect

July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-10-01T23:59:59.000Z

479

Improved recovery demonstration for Williston Basin carbonates. Quarterly report, July 1 - September 30, 1996  

SciTech Connect

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in- place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing 3-dimensional (3D) and multi-component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. Field demonstrations are in progress to collect data for evaluation of horizontal completions in both the Red River and Ratcliffe. A vertical well in the Red River will test attribute analysis of 3D seismic data for prediction of porosity development. Additional seismic acquisitions and interpretation are in progress for both the Ratcliffe and Red River. A water-injectivity test in a new horizontal completion in the Red Rive B zone at Buffalo Field is scheduled for next quarter.

Carrell, L.A.

1996-12-31T23:59:59.000Z

480

Lessons Learned Quarterly Report, December 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1997 1997 Lessons Learned Quarterly Report, December 1997 Welcome to the fourth quarter FY 1997 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: NEPA Review Adds Value to Proposed Sale of Naval Petroleum Reserve INEEL EIS: New Approaches to Scoping CEQ Environmental Justice Guidance Strategies for EIS Savings ISO 14000 and NEPA Recent EIS Milestones NAEP NEPA Recommendations New National Environmental Training Office Beneficial Landscaping Practices Draft CEQ Guidance on Global Climate Change Transitions DOE-wide NEPA Contracts Update Transboundary Environmental Impacts Annual NEPA Planning Summaries Recent NEPA Guidance Public Involvement: If You Don't Know Where You're Going Litigation Updates Questionnaire Results EIS-related Documents

Note: This page contains sample records for the topic "quarterly field walkdown" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

NEPA Lessons Learned Quarterly Report Questionnaire | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire This questionnaire is used to collect information from the Department of Energy (DOE) National Environmental Policy Act (NEPA) Community. In accordance with DOE Order 451.1B, NEPA Compliance Program, NEPA Document Managers and NEPA Compliance Officers should fill out a questionnaire (separately or jointly) as soon as possible after completing each environmental impact statement (EIS) and environmental assessment (EA). Questionaires also may be returned earlier, at any time during the NEPA process, to share valuable lessons learned with others. Other document preparation team members also are encouraged to submit a questionnaire. Information provided through this questionaire helps the Office of NEPA

482

QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 News Updates Dominion Resources, Inc. has informed the NRC that Dominion Virginia Power will amend its COL application (COLA) to reflect the ESBWR technology by the end of 2013. In 2009 Dominion dropped the ESBWR from its COLA after failing to reach a commercial agreement with General Electric-Hitachi (GEH). A COL is expected no earlier than late 2015. Dominion Virginia Power has not yet committed to building a new nuclear unit at North Anna. NRC has determined that the latest revision to the South Texas Project COLA does not alleviate foreign interest concerns; the staff found that despite having only a 10% ownership stake in Nuclear Innovation North America LLC (NINA), Toshiba American Nuclear Energy Corporation's

483

Financial News for Major Energy Producers, Third Quarter 2010  

Gasoline and Diesel Fuel Update (EIA)

Producers, Third Quarter 2010 Producers, Third Quarter 2010 Release Date: January 5, 2011 Next Release Date: To Be Determined Report Sections: Corporate and Petroleum Net Income Worldwide Oil and Gas Production Operations Worldwide Refining/Marketing Operations Worldwide Petroleum Capital Expenditures Worldwide Downstream Natural Gas and Power, and Chemicals Operations Supplemental Figures Supplemental Tables Download this Report: Full Report in PDF-Format Past Issues in PDF-Format Additional Information FRS Home Financial Terms Glossary Contacts Notes: The "Financial News for Major Energy Producers" is issued quarterly to report recent trends in the financial performance of the major energy producers. "Major energy producers" are respondents to Form EIA-28 (Financial Reporting System). All U.S.-based respondent companies that

484

Lessons Learned Quarterly Report, December 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1998 December 1998 Lessons Learned Quarterly Report, December 1998 Welcome to the fourth quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: New and Improved NEPA Compliance Guide Issued in 2 Volumes NEPA Community Meeting in Las Vegas Managing Baseline Environmental Information for the Sandia Site-wide EIS Water Project Mini-guidance Regulatory Compliance and NEPA Procedures for an Environmental Critique and Synopsis, and a Supplement Analysis EPA Broadens Voluntary EIS Policy Historic Preservation Proposed Regulatory Revision Withdrawn Acting Chair at CEQ Training Opportunities Environmental Lessons Learned Seminars Litigation Updates DOE NEPA Community Members in Transition Annual NEPA Planning Summaries Performance-based Statements of Work

485

Lessons Learned Quarterly Report, June 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 2002 Lessons Learned Quarterly Report, June 2002 Welcome to the 31st quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Articles in this issue include: Beverly Cook Balances NEPA Objectives: Both Flexibility and Consistency Are Needed DOE NEPA Community Meeting in July Expanding Online Access to DOE NEPA Documents Change in e-file Submittal Address Perspectives from a Town Official EH Priority: Guidance to Improve NEPA Implementation EPA Distributes Reminders on Filing an EIS Interior Department Welcomes Electronic EISs New on the NEPA Bookshelf Transitions Whats New from CEQ Training Opportunities Litigation Updates Proposals Due for New DOE-wide Contracts EAs and EISs Completed This Quarter

486

Lessons Learned Quarterly Report, June 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Lessons Learned Quarterly Report, June 2001 Welcome to the 27th quarterly report on lessons learned in the NEPA process. Articles included in this issue: DOE Issues Supplement to Yucca Mountain Draft EIS Los Alamos Project Guided by MAP BPAs Readers Guide Cultural, Tribal, and Historic Updates Secretarial Policy on Cultural Resources Working with Indian Tribal Nations Historic Preservation Final Regulations Can Pilot Projects, Dispute Resolution Techniques Improve NEPA Implementation? DOE-wide NEPA Contracts Update Mini-guidance: DOE Public Reading Rooms Drafting Federal Register Notices Potential NEPA Implications of a National Energy Policy Nominee for CEQ Transitions Training Opportunities EAs and EISs Completed This Quarter Recent EIS Milestones Cost and Time Facts

487

Program Update: 3rd Quarter 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Program Update: 3rd Quarter 2010 Inside this Update: Public Access Established for the Dr. Modesto Iriarte Technological Museum in Rincόn, Puerto Rico; Draft LM Strategic Plan Available for Review; Legacy Management Business Center Awarded Second Energy-Efficiency Award; LM Assumes Responsibility for Yucca Mountain Records and Information; Natural Gas Sampling at the Gasbuggy, New Mexico; Rio Blanco and Rulison, Colorado; Nuclear Gas Sites; Students from Native American Environmental Youth Camp Tour Tuba City, Arizona, Site; 2010 Long-Term Surveillance and Maintenance Conference, and more. Office of Legacy Management (LM) Program Update, July-September 2010 More Documents & Publications Program Update: 3rd Quarter 2011 Program Update: 3rd Quarter 2013

488

Quarterly Nuclear Deployment Scorecard - July 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - July 2012 Quarterly Nuclear Deployment Scorecard - July 2012 Quarterly Nuclear Deployment Scorecard - July 2012 News Updates The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months. The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to respond to outstanding technical issues and provide additional information related to post-Fukushima requirements. DOE released a funding opportunity announcement on March, 22 2012 to

489

Program Update: 4th Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Program Update: 4th Quarter 2013 Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS; Groundwater Remedy Is Evaluated at the Mound, Ohio, Site; Visitors Learn About the History of LM's Unique Facility in Puerto Rico; German Remediation Offi cials Benchmarking Visit; International Atomic Energy Agency Accepts Consultation from LM; Environmental Justice Activities; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time Office of Legacy Management (LM) Program Update, October-December 2013 More Documents & Publications

490

Quarterly Nuclear Deployment Scorecard - January 2014 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 News Updates Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US-APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension. Unistar Nuclear Operating Co. has formally withdrawn its COL application from the Nuclear Regulatory Commission (NRC) to build and operate Areva's U.S. EPR at its Nine Mile Point site in Oswego, NY. In

491

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 1995 March 1, 1995 Lessons Learned Quarterly Report, March 1995 This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised questionnaire that was provided for use during Janua~ 1995, and includes information on direct and indirect NEPA process costs and on total project costs. Additionally, the report includes a feature story on lessons learned during preparation of the F-Canyon Plutonium Solutions Environmental Impact Statement. December 1, 1994 Lessons Learned Quarterly Report, December 1994 On August 12, 1994 the Office of NEPA Oversight distributed an interim/draft lessons learned questionnaire to NEPA contacts to be used for reporting on environmental impact statements and environmental assessments

492

Lessons Learned Quarterly Report, December 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2004 Lessons Learned Quarterly Report, December 2004 Lessons Learned Quarterly Report, December 2004 The National Environmental Policy Act turns 35 on January 1, 2005! This landmark legislation altered the Federal decisionmaking process. In this issue of LLQR, Ray Berube, retired Deputy Assistant Secretary for Environment, looks back at how NEPA compliance procedures have evolved at DOE. Our lead article looks at how the Internet is becoming an increasingly useful NEPA tool. We hope you will find helpful suggestions throughout LLQR on how we can continue to improve and modernize NEPA implementation, and, as always, we welcome your suggestions for continuous improvement. Articles included in this issue: Putting the Web to Work for NEPA Case Studies Address NEPA Section 101

493

Lessons Learned Quarterly Report, March 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Lessons Learned Quarterly Report, March 2009 Welcome to the 58th quarterly report on lessons learned in the NEPA process. We have been very busy addressing our NEPA responsibilities arising from the recovery act as well as the new policies of the obama administration. In this issue of the Lessons Learned Quarterly Report (LLQR), we share ideas and experiences that will foster an improved and expedited NEPA compliance process. Articles included in this issue: NEPA Efficiency Essential to Recovery Plan NEPA Opportunities in a New Era of Openness Secretary Chu to DOE Employees: "Help Turn the Ship" Secretary Chu Pledges to Improve DOE Management New DOE-Wide NEPA Support Contracts! Sutley Brings Breadth of Government Experience to CEQ DOE Advances NEPA Process for Loan Guarantees

494

Lessons Learned Quarterly Report, September 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Lessons Learned Quarterly Report, September 2002 Welcome to the 32nd quarterly report on lessons learned in the NEPA process. Much of this issue is devoted to reporting on the July DOE NEPA Community Meeting. Also featured is new NEPA-related guidance. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Community Meeting Addresses Reform Initiatives New Guidance Issued, More Underway Accident Analysis Guidance Agencies Discuss Indian Sacred Sites e-NEPA: Security Certification Needed Draft Information Quality Guidelines Litigation Updates DOE-wide NEPA Contracts Update Training Opportunities EAs and EISs Completed This Quarter NEPA Document Cost and Time Facts Recent EIS-Related Milestones What Worked and Didn't Work

495

Lessons Learned Quarterly Report, March 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1996 1996 Lessons Learned Quarterly Report, March 1996 Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPArelated information, and enhanced the format for better clarity and overall readability. This Quarterly Report includes: A NEPA SUCCESS STORY: Environmental Impact Statement for the Safe Interim Storage of Hanford Tank Wastes NEPA lessons learned at the Hanford Site Mini-guidance on the preparation of EIS summaries, properly eliminating alternatives and impacts from detailed analysis, application of DOE NEPA regulations to procurement, and NEPA questions and answers Updates on the proposed amendments to DOE's NEPA regulations,

496

Quarterly Nuclear Deployment Summary, January 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deployment Summary, January 2013 Deployment Summary, January 2013 Quarterly Nuclear Deployment Summary, January 2013 January 30, 2013 - 5:59pm Addthis Quarterly Updates On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

497

The Savannah River Site's Groundwater Monitoring Program, second quarter 1989  

SciTech Connect

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

498

Energy programs. Quarterly report, January-March 1980  

DOE Green Energy (OSTI)

The Johns Hopkins University Applied Physics Laboratory, is engaged in developing energy resource, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the US Naval Air Station, Norfolk, Va.

Not Available

1980-01-01T23:59:59.000Z

499

Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994  

SciTech Connect

The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroads of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.

Not Available

1994-05-04T23:59:59.000Z

500

The Savannah River Site's Groundwater Monitoring Program, first quarter 1989  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.