National Library of Energy BETA

Sample records for quarter short-t erm

  1. QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry NaturalPrices1Markets160Product: TotalCoalbed7 (Released July3Q)

  2. Enterprise Risk Management (ERM) Framework for Directives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-09-30

    Explains the new ERM framework for developing, revising, and reviewing directives. This memo directs the Office of Management to institutionalize ERM into the directives process no later than September 30, 2012.

  3. Enterprise Risk Management (ERM) Model - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Team, is intended to act as an instructional document for the use of the ERM risk assessment tool. We are working to incorporate this tool into the current Justification...

  4. Mdm10 is an ancient eukaryotic porin co-occurring with the ERMES complex

    E-Print Network [OSTI]

    Just, Armin

    Mdm10 is an ancient eukaryotic porin co-occurring with the ERMES complex Nadine Flinner a , Lars -barrel protein Multiple sequence alignment Homology modeling Phylogenetic analysis ERMES SAM mitochondria encounter structure (ERMES), which tethers the ER to mitochondria and associates with the SAM

  5. Measuring the Capacity of Sets of Functions in the Analysis of ERM

    E-Print Network [OSTI]

    Steinwart, Ingo

    Measuring the Capacity of Sets of Functions in the Analysis of ERM Ingo Steinwart Abstract Empirical risk minimization (ERM) is a fundamental learning principle that serves as the underlying idea for various learning algorithms. Moreover, ERM appears in many hyper-parameter selection strategies

  6. A PHOTOGRAMMETRIC MEASUREMENT METHOD USING CSG MODELS Pierre Ermes, Frank A. van den Heuvel, George Vosselman

    E-Print Network [OSTI]

    Vosselman, George

    A PHOTOGRAMMETRIC MEASUREMENT METHOD USING CSG MODELS Pierre Ermes, Frank A. van den Heuvel, George Delft, The Netherlands E-mail: {P.Ermes, F.A.vandenHeuvel, G.Vosselman}@geo.tudelft.nl Commission V is embedded in a measurement system for piping installations, as is discussed in a broader context by Ermes

  7. Redundant control of migration and adhesion by ERM proteins in vascular smooth muscle cells

    SciTech Connect (OSTI)

    Baeyens, Nicolas; Latrache, Iman; Yerna, Xavier; Noppe, Gauthier; Horman, Sandrine; Morel, Nicole

    2013-11-22

    Highlights: •The three ERM proteins are expressed in vascular smooth muscle cell. •ERM depletion inhibited PDGF-evoked migration redundantly. •ERM depletion increased cell adhesion redundantly. •ERM depletion did not affect PDGF-evoked Ca signal, Rac1 activation, proliferation. •ERM proteins control PDGF-induced migration by regulating adhesion. -- Abstract: Ezrin, radixin, and moesin possess a very similar structure with a C-terminal actin-binding domain and a N-terminal FERM interacting domain. They are known to be involved in cytoskeleton organization in several cell types but their function in vascular smooth muscle cells (VSMC) is still unknown. The aim of this study was to investigate the role of ERM proteins in cell migration induced by PDGF, a growth factor involved in pathophysiological processes like angiogenesis or atherosclerosis. We used primary cultured VSMC obtained from rat aorta, which express the three ERM proteins. Simultaneous depletion of the three ERM proteins with specific siRNAs abolished the effects of PDGF on cell architecture and migration and markedly increased cell adhesion and focal adhesion size, while these parameters were only slightly affected by depletion of ezrin, radixin or moesin alone. Rac1 activation, cell proliferation, and Ca{sup 2+} signal in response to PDGF were unaffected by ERM depletion. These results indicate that ERM proteins exert a redundant control on PDGF-induced VSMC migration by regulating focal adhesion turn-over and cell adhesion to substrate.

  8. Quarterly Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Expand Doing Business Skip navigation links Financial Information Annual Reports Prior Fiscal Years Quarterly Reports Prior Fiscal Years Financial Overview FY 2014...

  9. Quarterly Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptionsProteinTotalSciTechApril 2015 QuarterlyEE0003585Quarterly2

  10. Quarterly Progress Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quarterly Progress Reports Quarterly Progress Reports Investigating the field of high energy physics through experiments that strengthen our fundamental understanding of matter,...

  11. Quarterly Progress Report

    Broader source: Energy.gov [DOE]

    Quarterly Progress Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  12. Quarterly coal report

    SciTech Connect (OSTI)

    Young, P.

    1996-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1995 and aggregated quarterly historical data for 1987 through the third quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  13. Directives Quarterly Updates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

  14. Quarterly Performance Measure Report Department

    E-Print Network [OSTI]

    Quarterly Performance Measure Report Department: For Quarter Ended: Actual Performance Customer Service First Quarter 1,031,972/2nd Qut. 995,778/3rd Qut. 1,125,080/4th Qut. 1,501,390, Total Year 4.99% Sustainability 1.70% 2. Conduct annual customer service survey No action necessary 2. Quarterly YTD Revenue

  15. Measuring dark energy with the $E_{\\rm iso}-E_{\\rm p}$ correlation of GRBs using model-independent methods

    E-Print Network [OSTI]

    Wang, J S; Cheng, K S; Dai, Z G

    2015-01-01

    In this paper, we use two model-independent methods to standardize long gamma-ray bursts (GRBs) using the $E_{\\rm iso}-E_{\\rm p}$ correlation, where $E_{\\rm iso}$ is the isotropic-equivalent gamma-ray energy and $E_{\\rm p}$ is the spectral peak energy. We update 42 long GRBs and try to make constraint on cosmological parameters. The full sample contains 151 long GRBs with redshifts from 0.0331 to 8.2. The first method is the simultaneous fitting method. The extrinsic scatter $\\sigma_{\\rm ext}$ is taken into account and assigned to the parameter $E_{\\rm iso}$. The best-fitting values are $a=49.15\\pm0.26$, $b=1.42\\pm0.11$, $\\sigma_{\\rm ext}=0.34\\pm0.03$ and $\\Omega_m=0.79$ in the flat $\\Lambda$CDM model. The constraint on $\\Omega_m$ is $0.55supernovae (SNe Ia) to calibrate the $E_{\\rm iso}-E_{\\rm p}$ co...

  16. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  17. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  18. EMSL Quarterly Highlights Report: FY09, 4th Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

    2009-10-21

    This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

  19. EMSL Quarterly Highlights Report: 4th Quarter, FY08

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2008-11-24

    This report outlines the science highlights, publications, and other happenings at EMSL in 4th quarter of FY08.

  20. EMSL Quarterly Highlights Report: FY09, 3rd Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

    2009-07-17

    This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

  1. Short-term energy outlook quarterly projections. Third quarter 1997

    SciTech Connect (OSTI)

    1997-07-01

    This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

  2. Short-term energy outlook. Quarterly projections, second quarter 1996

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

  3. TIME SCHEDULE WINTER QUARTER 1970

    E-Print Network [OSTI]

    Kaminsky, Werner

    MASTER CON TIME SCHEDULE WINTER QUARTER 1970 ADVANCE REGISTRATION NOVEMBER 3-21 IN, please leave it or pass it along so that other students may use it. #12;Winter Quarter 1970. Examination

  4. Quarterly environmental data summary for first quarter 1999

    SciTech Connect (OSTI)

    NONE

    1999-06-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1999 is enclosed. The data presented in this constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group and merged into the database during the first quarter of 1999. KPA results for on-site total uranium analyses performed during first quarter 1999 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  5. Quarterly Progress Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptionsProteinTotalSciTechApril 2015 QuarterlyEE0003585Quarterly

  6. Catalog Year: 2014 Fall Quarter Units Winter Quarter Units Spring Quarter Units

    E-Print Network [OSTI]

    THIRD YEAR FOURTH YEAR ELECTRICAL ENGINEERING To earn a B.S., you must complete all CollegeCatalog Year: 2014 Fall Quarter Units Winter Quarter Units Spring Quarter Units CS 010* 4 CS 013 4 Linear Methodsfor Engr. Analysis ENGL 001A 4 MATH 009B 4 MATH 009C 4 Beginning Composition First Year

  7. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-08-15

    This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  8. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

    2010-02-04

    This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

  9. EMSL Quarterly Highlights Report: 2nd Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-05-04

    This report outlines the highlights, staff and user accomplishments, and publications that occured during FY09, 2nd quarter at EMSL.

  10. Short-term energy outlook. Quarterly projections, Third quarter 1995

    SciTech Connect (OSTI)

    NONE

    1995-08-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

  11. Quarterly Nuclear Deployment Scorecard - October 2015 | Department...

    Energy Savers [EERE]

    Quarterly Nuclear Deployment Scorecard - October 2015 Quarterly Nuclear Deployment Scorecard - October 2015 News Updates The Nuclear Regulatory Commission has issued an operating...

  12. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report In this Quarter, the research was focused continually on the...

  13. Molecular catalytic coal liquid conversion. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    October--December 1994 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly report, October--December 1994 In this Quarter, the...

  14. Molecular catalytic coal liquid conversion. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly report In this Quarter, the research was focused continually on the two...

  15. Quarterly Technical Progress Report

    SciTech Connect (OSTI)

    Murty A. Akundi

    1998-12-02

    This report presents the work done on " Investigation of Syngas Interaction in Alcohol Synthesis Catalysts" during the last quarter. FTIR absorption studies on Cu/Co/Cr catalysts using CO as a probe molecule are presented in this report. A comprehensive FTIR investigation on the catalysts was undertaken to unfold the picture of the gas - metal interactions. Our magnetization studies have provided valuable information on the changes in the magnetic character of the ferromagnetic metal due to CO adsorption. The FTIR results showing the effect of the adsorbate-adsorbent interactions on the stretching frequencies of the CO vibrational modes are presented in this report.

  16. Quarterly Progress Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptionsProteinTotalSciTechApril 2015 Quarterly

  17. Program Update: 4th Quarter 2009 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    October-December 2009 More Documents & Publications Program Update: 2nd Quarter 2010 Program Update: 2nd Quarter 2009 Program Update: 3rd Quarter 2009...

  18. NEAMS Quarterly Report for January-March 2014 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEAMS Quarterly Report for January-March 2014 NEAMS Quarterly Report for January-March 2014 NEAMSQuarterlyReportJan-Mar14.pdf More Documents & Publications NEAMS Quarterly...

  19. Quarterly coal report, July--September 1997

    SciTech Connect (OSTI)

    NONE

    1998-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

  20. Short-term energy outlook: Quarterly projections. Second quarter 1995

    SciTech Connect (OSTI)

    1995-05-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  1. Short-term energy outlook. Quarterly projections, third quarter 1996

    SciTech Connect (OSTI)

    NONE

    1996-07-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  2. dgw_cmod_quarterly.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    laboratory experiments, to develop and test a model for the trap formation and fuel migration that can explain the observations. 2 C-Mod Quarterly Oct 2010 Reminder of C-Mod...

  3. Quarterly environmental data summary for first quarter 1998

    SciTech Connect (OSTI)

    NONE

    1998-05-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the first quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base, and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined {open_quotes}above normal{close_quotes} Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES&H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in the event that {open_quotes}above normal{close_quotes} data occur. All data received and verified during the first quarter were within a permissible range of variability except for those detailed below. Above normal occurrences are cited for groundwater, air, and NPDES data. There were none for springs or surface water. The following discussion offers a brief summary of the data merged during the first quarter that exceeded the above normal criteria and updates on past reported above normal data. The attached tables present the most recent data for air and the data merged into the data base during the first quarter 1998 for groundwater, NPDES, surface water, and springs. Graphs showing concentrations of selected contaminants of concern at some of the critical locations have also been included in this QEDS. The graphs are discussed in the separate sections.

  4. Quarterly coal report, April--June 1997

    SciTech Connect (OSTI)

    NONE

    1997-11-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  5. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    SciTech Connect (OSTI)

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  6. Strategic Petroleum Reserve. Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-11-15

    The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated. Samples of the oil revealed two problems that, although readily correctable, have reduced the availability of some of the oil inventory for drawdown in the near-term. These problems are: (1) a higher-than-normal gas content in some of the crude oil, apparently from years of intrusion of methane form the surrounding salt formation; and (2) elevated temperatures of some of the crude oil, due to geothermal heating, that has increased the vapor pressure of the oil. Investigations are proceeding to determine the extent to which gas intrusion and geothermal heating are impacting the availability of oil for drawdown. Preliminary designs have been developed for systems to mitigate both problems.

  7. Short-term energy outlook. Quarterly projections, first quarter 1996

    SciTech Connect (OSTI)

    NONE

    1996-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

  8. Short-term energy outlook: Quarterly projections, second quarter 1997

    SciTech Connect (OSTI)

    1997-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

  9. Short-term energy outlook, Quarterly projections. Third quarter 1993

    SciTech Connect (OSTI)

    NONE

    1993-08-04

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  10. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    SciTech Connect (OSTI)

    Not Available

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  11. Short-term energy outlook quarterly projections. First quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-02-07

    The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

  12. Short-term energy outlook, quarterly projections, first quarter 1998

    SciTech Connect (OSTI)

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  13. Quarterly coal report, October--December 1996

    SciTech Connect (OSTI)

    1997-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1996 and aggregated quarterly historical data for 1990 through the third quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 72 tabs.

  14. UNIVERSITY LIBRARY Fall Quarter 2013

    E-Print Network [OSTI]

    Ishida, Yuko

    -centricity September 24, 2013 UC Davis University Library Town Hall 7 #12;State of the Library Report: NATIONAL · OpenUC DAVIS UNIVERSITY LIBRARY TOWN HALL Fall Quarter 2013 September 24, 2013 UC Davis University Library Town Hall 1 #12;TOWN HALL Webcast This session is being live Webcast with Adobe Connect Questions

  15. New Publications Fourth Quarter 2004

    E-Print Network [OSTI]

    New Publications Fourth Quarter 2004 October­December 2004 What's Inside . . . · Prescribed fire Resource Bulletin RMRS-RB-4 December 2004 Idaho's Forest Products Industry: A Descriptive Analysis Todd A General Technical Report RMRS-GTR-138 December 2004 Repeatability of Riparian Vegetation Sampling Methods

  16. Quarterly coal report, January--March 1995

    SciTech Connect (OSTI)

    NONE

    1995-08-24

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1995 and aggregated quarterly historical data for 1987 through the fourth quarter of 1994. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  17. Quarterly coal report, October--December 1994

    SciTech Connect (OSTI)

    NONE

    1995-05-23

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1994 and aggregated quarterly historical data for 1986 through the third quarter of 1994. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  18. Quarterly coal report, October--December 1997

    SciTech Connect (OSTI)

    NONE

    1998-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities. This report presents detailed quarterly data for october through December 1997 and aggregated quarterly historical data for 1991 through the third quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data, as specified in Section 202 of the energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  19. Quarterly coal report, January--March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-24

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1994 and aggregated quarterly historical data for 1986 through the fourth quarter of 1993. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  20. Program Update: 1st Quarter 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management (LM) Program Update, January-March 2013 More Documents & Publications Program Update: 2nd Quarter 2013 Program Update: 3rd Quarter 2013 Program Update: 1st Quarter 2015...

  1. Program Update: 3rd Quarter 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3rd Quarter 2011 Program Update: 3rd Quarter 2011 The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE...

  2. Program Update: 1st Quarter 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management (LM) Program Update, January-March 2010 More Documents & Publications Program Update: 3rd Quarter 2010 Program Update: 2nd Quarter 2010 Program Update: 4th Quarter 2010...

  3. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1991-08-15

    This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

  4. Monitoring Report for Second Quarter 2010

    E-Print Network [OSTI]

    for CSMRI Site Second Quarter 2010 TABLE OF CONTENTS 1. INTRODUCTION .........................................................................................................................2 2.2 SURFACE WATER SAMPLING..............................................................................................................3 2.3.2 Surface Water Analyses

  5. Monitoring Report for Third Quarter 2010

    E-Print Network [OSTI]

    for CSMRI Site Third Quarter 2010 TABLE OF CONTENTS 1. INTRODUCTION..............................................................................................................................2 2.2 SURFACE WATER SAMPLING..............................................................................................................3 2.3.2 Surface Water Analyses

  6. Monitoring Report for Fourth Quarter 2010

    E-Print Network [OSTI]

    for CSMRI Site Fourth Quarter 2010 TABLE OF CONTENTS 1. INTRODUCTION..............................................................................................................................2 2.2 SURFACE WATER SAMPLING..............................................................................................................3 2.3.2 Surface Water Analyses

  7. Quarterly coal report, April--June 1990

    SciTech Connect (OSTI)

    Not Available

    1990-11-02

    The Quarterly Coal Report provides comprehensive information about US coal production, exports, imports, receipts, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. This issue presents detailed quarterly data for April 1990 through June 1990, aggregated quarterly historical data for 1982 through the second quarter of 1990, and aggregated annual historical data for 1960 through 1989 and projected data for selected years from 1995 through 2010. To provide a complete picture of coal supply and demand in the United States, historical information and forecasts have been integrated in this report. 7 figs., 37 tabs.

  8. Lessons Learned Quarterly Report, June 2003

    Broader source: Energy.gov [DOE]

    Welcome to the 35th quarterly report on lessons learned in the NEPA process. We are pleased to include in this issue three new mini-guidance articles.

  9. Lessons Learned Quarterly Report, September 1999

    Office of Energy Efficiency and Renewable Energy (EERE)

    Welcome to the 20th Quarterly Report on lessons learned in the NEPA process. This issue includes a cumulative index for the past five years.

  10. Quarterly Nuclear Deployment Scorecard - January 2015 | Department...

    Energy Savers [EERE]

    January 2015 Quarterly Nuclear Deployment Scorecard - January 2015 News Updates The NRC has scheduled a public Commissioner's hearing for February 4 on DTE Electric's...

  11. Quarterly Cybersecurity Awareness Campaigns and Toolkits | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    practices, policies, and terms so that heshe can be a 'cyber aware' user of the Internet at work and at home. The OCIO sponsors quarterly cybersecurity awareness campaigns...

  12. Molecular catalytic coal liquid conversion. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly report You are accessing a document from the Department of Energy's (DOE)...

  13. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    July--September 1995 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report, July--September 1995 The research was...

  14. Molecular catalytic coal liquid conversion. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    October--December 1994 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly report, October--December 1994 You are accessing a...

  15. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    July--September 1995 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report, July--September 1995 You are accessing...

  16. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report You are accessing a document from the Department of...

  17. Lessons Learned Quarterly Report Archive | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and enhanced the format for better clarity and overall readability. December 1, 1995 Lessons Learned Quarterly Report, December 1995 This quarterly report summarizes the...

  18. Quarterly Nuclear Power Deployment Scorecard - April 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Nuclear Power Deployment Scorecard - April 2013 Quarterly Nuclear Power Deployment Scorecard - April 2013 News Updates On November 20, 2012, the Department of Energy...

  19. Post Competition Accountability Report: Second Quarter, FY 2013

    Broader source: Energy.gov [DOE]

    Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012–2016: Reporting Period: Second Quarter, FY 2013

  20. Post Competition Accountability Report: Third Quarter, FY 2013

    Broader source: Energy.gov [DOE]

    Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012–2016: Reporting Period: Third Quarter, FY 2013

  1. Quarterly Biomass Program/Clean Cities States Web Conference...

    Office of Environmental Management (EM)

    Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Presentation from the...

  2. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    SciTech Connect (OSTI)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  3. Quarterly coal report, January--March 1993

    SciTech Connect (OSTI)

    Not Available

    1993-08-20

    The United States produced 242 million short tons of coal in the first quarter of 1993, a decrease of 6 percent (14 million short tons) from the amount produced during the first quarter of 1992. The decrease was due to a decline in production east of the Mississippi River. All major coal-producing States in this region had lower coal production levels led by West Virginia, which produced 5 million short tons less coal. The principal reasons for the overall drop in coal output compared to a year earlier were: A decrease in demand for US coal in foreign markets; a slower rate of producer/distributor stock build-up; and a drawn-down of electric utility coal stocks. Distribution of US coal in the first quarter of 1993 was 10 million short tons lower than in the first quarter of 1992, with 5 million short tons less distributed to both electric utilities and overseas markets. The average price of coal delivered to electric utilities during the first quarter of 1993 was $28.65 per short ton, the lowest value since the first quarter of 1980. Coal consumption in the first quarter of 1993 was 230 million short tons, 4 percent higher than in the first quarter of 1992, due primarily to a 5-percent increase in consumption at electric utility plants. Total consumer stocks, at 153 million short tons, and electric utility stocks, at 144 million short tons, were at their lowest quarterly level since the end of 1989. US. coal exports totaled 19 million short tons, 6 million short tons less than in the first quarter of 1992, and the lowest quarterly level since 1988. The decline was primarily due to a 1-million-short-ton drop in exports to each of the following destinations: Italy, France, Belgium and Luxembourg, and Canada.

  4. Short-term energy outlook. Quarterly projections, Third quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

  5. Short-term energy outlook, quarterly projections, second quarter 1998

    SciTech Connect (OSTI)

    1998-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  6. THE MISOSYS QUARTERLY In this issue

    E-Print Network [OSTI]

    Mann, Tim

    .. Volume 11.111 $10 Winter 1988 #12;#12;THE MISOSYS QUARTERLY Volume ll.iii Winter 1988 Table of ContentsTHE MISOSYS QUARTERLY In this issue: re HEADLINE Driver for Model I/Ill LDOS, by Hans de Wolf XLR8Comp.................................... 58 LS-FED-11 ................................... 60 Little Brother Data Manager

  7. RENEWABLE ENERGY PROGRAM QUARTERLY REPORT TO THE

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION RENEWABLE ENERGY PROGRAM QUARTERLY REPORT TO THE LEGISLATURE January #12;1 California Energy Commission's Quarterly Report Regarding the Renewable Energy Program (January to the Legislature on the Renewable Energy Program, covering the period January 1 to March 31, 2002. The Energy

  8. OpenEI Community - quarterly

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly Smart Grid Data available for download

  9. SRTC Quarterly Report, October-November-December 1996

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1997-12-31

    This is the Savannah River Technology Center quarterly report for October - November - December 1996.

  10. Quarterly Construction Status Report Period Ending: December 31, 2014

    E-Print Network [OSTI]

    Alpay, S. Pamir

    Cast Stone Replacement 901833 Quarterly Construction Status Report for Period Ending: December 31, 2014

  11. ERM 593 Applied Project_Guidance for Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System_Final_05-05-15

    SciTech Connect (OSTI)

    Elicio, Andy U.

    2015-05-05

    My ERM 593 applied project will provide guidance for the Los Alamos National Laboratory Waste Stream Profile reviewer (i.e. RCRA reviewer) in regards to Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System. The Waste Compliance and Tracking system is called WCATS. WCATS is a web-based application that “supports the generation, characterization, processing and shipment of LANL radioactive, hazardous, and industrial waste.” The LANL generator must characterize their waste via electronically by filling out a waste stream profile (WSP) in WCATS. Once this process is completed, the designated waste management coordinator (WMC) will perform a review of the waste stream profile to ensure the generator has completed their waste stream characterization in accordance with applicable state, federal and LANL directives particularly P930-1, “LANL Waste Acceptance Criteria,” and the “Waste Compliance and Tracking System User's Manual, MAN-5004, R2,” as applicable. My guidance/applied project will describe the purpose, scope, acronyms, definitions, responsibilities, assumptions and guidance for the WSP reviewer as it pertains to each panel and subpanel of a waste stream profile.

  12. Strategic Petroleum Reserve: Annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1994-02-16

    Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

  13. FOIA Quarterly Reports (Q3 2014)

    Broader source: Energy.gov [DOE]

    Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

  14. FOIA Quarterly Reports (Q1-2014)

    Broader source: Energy.gov [DOE]

    Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

  15. Monitoring Report for First Quarter 2008

    E-Print Network [OSTI]

    for CSMRI Site First Quarter 2008 toc i April 2008 TABLE OF CONTENTS 1. INTRODUCTION .........................................................................................................................1 2.2 SURFACE WATER SAMPLING..............................................................................................................3 2.3.2 Surface Water Analyses

  16. Monitoring Report for Second Quarter 2008

    E-Print Network [OSTI]

    for CSMRI Site Second Quarter 2008 toc i June 2008 TABLE OF CONTENTS 1. INTRODUCTION .........................................................................................................................1 2.2 SURFACE WATER SAMPLING..............................................................................................................3 2.3.2 Surface Water Analyses

  17. Lessons Learned Quarterly Report, March 1995

    Broader source: Energy.gov [DOE]

    This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised questionnaire that was provided...

  18. Lessons Learned Quarterly Report, March 2003

    Broader source: Energy.gov [DOE]

    Welcome to the 34th quarterly report on lessons learned in the NEPA process. We are pleased to feature the synergy between NEPA and the new DOE Order 450.1, Environmental Protection Program.

  19. Lessons Learned Quarterly Report, September 2002

    Office of Energy Efficiency and Renewable Energy (EERE)

    Welcome to the 32nd quarterly report on lessons learned in the NEPA process. Much of this issue is devoted to reporting on the July DOE NEPA Community Meeting. Also featured is new NEPA-related guidance.

  20. Lessons Learned Quarterly Report, June 2004

    Broader source: Energy.gov [DOE]

    Welcome to the 39th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned.

  1. Lessons Learned Quarterly Report, September 2000

    Broader source: Energy.gov [DOE]

    Welcome to the 24th quarterly report on lessons learned in the NEPA process. Note that this issue includes a cumulative index covering the past six years of reports.

  2. Lessons Learned Quarterly Report, September 2007

    Broader source: Energy.gov [DOE]

    Welcome to the 52nd quarterly report on lessons learned in the NEPA process. This issue highlights the start of two major DOE EISs and features several guest-written articles.

  3. Lessons Learned Quarterly Report, September 2001

    Broader source: Energy.gov [DOE]

    Welcome to the 28th quarterly report on lessons learned in the NEPA process. This completes our seventh year of providing performance metrics, news, and guidance to the DOE NEPA Community. Please note the cumulative index in this issue.

  4. Quarter 4, 2010 Page 1 of 2

    E-Print Network [OSTI]

    Ford, James

    : _________________________ All areas containing hazardous materials must be inspected at least quarterly. Note corrective actions areas free of electrical hazards? (No exposed wiring or damaged electrical cords; extension cords(s): _________________________ PI/Area Supervisor: ______________________ Inspected By: _________________________ Date

  5. Quarter 2, 2011 Page 1 of 2

    E-Print Network [OSTI]

    Kay, Mark A.

    : _________________________ All areas containing hazardous materials must be inspected at least quarterly. Note corrective actions areas free of electrical hazards? (No exposed wiring or damaged electrical cords; extension cords(s): _________________________ PI/Area Supervisor: ______________________ Inspected By: _________________________ Date

  6. Quarter 4, 2005 Page 1 of 2

    E-Print Network [OSTI]

    Ford, James

    : _________________________ All areas containing hazardous materials must be inspected at least quarterly. Note corrective actions(s): _________________________ PI/Area Supervisor: ______________________ Inspected By: _________________________ Date and free of trip hazards, equipment, hazardous material, or combustible storage? 3. Are personal protective

  7. Lessons Learned Quarterly Report, March 2004

    Office of Energy Efficiency and Renewable Energy (EERE)

    Welcome to the 38th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned.

  8. Lessons Learned Quarterly Report, September 2008

    Broader source: Energy.gov [DOE]

    Welcome to the 56th quarterly report on lessons learned in the NEPA process. We are pleased to feature EPA ’s web-based tool for NEPA practitioners, as well as the new DOE NEPA Website.

  9. Lessons Learned Quarterly Report, Test Edition

    Broader source: Energy.gov [DOE]

    Welcome to the test edition of the Lessons Learned Quarterly Report. This edition features revised draft guidance on greenhouse gas emissions and climate change,  new flood risk management...

  10. THE MISOSYS QUARTERLY In this issue

    E-Print Network [OSTI]

    Mann, Tim

    QUARTERLY Volume I, Issue iv Spring 1987 17l):fP.O. SOX297 II AOS1 2;.Table of Contents The BlurbTHE MISOSYS QUARTERLY In this issue: · UNDATE reverses DATECONV by L M Garcia-Barro 80x86 assembly-Barro .........56 STRIP/BAS by James K. Beard, Ph.D . . . . . . . . 59 MORSE code from a Model 4 ............60 Data

  11. THE MISOSYS QUARTERLY In this issue

    E-Print Network [OSTI]

    Mann, Tim

    I, Issue iii Winter 1987 #12;#12;THE MISOSYS QUARTERLY Volume I, Issue IN Winter 1987 - 4s TableTHE MISOSYS QUARTERLY In this issue: LS-DOS 6.3 Column from LSI Extended Memory access for LS-DOS Upgrading Little Brother to LS-DOS 6.3 Converting Mail File Data to LB! A "CAT" for LDOS; 'KILL' for LS

  12. I = fall quarter, II = winter quarter, III = spring quarter, IV = summer session *Course is offered in odd years only (2013, 2015, etc.)

    E-Print Network [OSTI]

    Hernes, Peter J.

    I = fall quarter, II = winter quarter, III = spring quarter, IV = summer session *Course is offered in odd years only (2013, 2015, etc.) **Course is offered in even years only (2012, 2014, etc Subject Matter Offered Units Completed Notes Written and Oral Expression Choose one of the following UWP

  13. Name: Intended quarter of entry: Academic Planning Worksheet for Oceanography

    E-Print Network [OSTI]

    Name: Intended quarter of entry: Academic Planning Worksheet for Oceanography This worksheet quarter of the junior year. Visit the general catalog for more information on this major: www.washington.edu/students/gencat/academic/oceanography

  14. Fossil Energy Today - First Quarter, 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First Quarter, 2012 Fossil Energy Today - First Quarter, 2012 Topics In This Issue.... CT Scanners Give Energy Researchers a Core Understanding of Marcellus Shale Large-Scale CO2...

  15. Quarterly Biomass Program/Clean Cities State Web Conference:...

    Energy Savers [EERE]

    Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Presentation from May 6, 2010...

  16. Natural Gas Imports and Exports First Quarter Report 2015 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Natural Gas Imports and Exports First Quarter Report 2015 Natural Gas Imports and Exports First Quarter Report 2015 1Q2015.pdf More Documents & Publications Natural Gas Imports and...

  17. Program Update: 3rd Quarter 2012 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    of Legacy Management (LM) Program Update: July-September 2012 More Documents & Publications Program Update: 3rd Quarter 2013 Program Update: 4th Quarter 2011 Program Update: 1st...

  18. Program Update: 3rd Quarter 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Update: 3rd Quarter 2014 Program Update: 3rd Quarter 2014 Inside this Update: 2014 LM All-Hands Training, LM to Meet Energy Metering Goals, Anatomy of a Groundwater Uranium...

  19. Better Buildings Quarterly Program Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Neighborhood Program. Better Buildings Quarterly Program Report More Documents & Publications Program Metrics Massachusetts -- SEP Data Dashboard Austin Energy Data Dashboard...

  20. Natural gas imports and exports. Second quarter report

    SciTech Connect (OSTI)

    NONE

    1997-12-31

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1997 (April through June).

  1. Idaho National Laboratory Quarterly Performance Analysis

    SciTech Connect (OSTI)

    Lisbeth Mitchell

    2014-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INL from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.

  2. OpenEI Community - quarterly meeting

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly Smart Grid Data available for downloadGRR 3rd Quarter -

  3. Idaho National Laboratory Quarterly Performance Analysis - 3rd Quarter FY2014

    SciTech Connect (OSTI)

    Lisbeth A. Mitchell

    2014-09-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other non-reportable issues identified at INL from July 2013 through June 2014.

  4. Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014

    SciTech Connect (OSTI)

    Lisbeth A. Mitchell

    2014-06-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

  5. Weldon Spring Site Remedial Action Project quarterly environmental data summary for second quarter 1998

    SciTech Connect (OSTI)

    NONE

    1998-08-11

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the second quarter of 1998 is enclosed. The data presented constitutes the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the database during the second quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the database and KPA data are not merged into the regular database. All data received and verified during the second quarter were within a permissible range of variability, except for those listed. Above normal occurrences are cited for groundwater, air, and NPDES data. There were no above normal occurrences for springs or surface water. The attached tables present the most recent data for air and the data merged into the database during the second quarter 1998 for groundwater, NPDES, surface water, and springs.

  6. QUARTERLY OF APPLIED MATHEMATICS VOLUME , NUMBER 0

    E-Print Network [OSTI]

    Zhu, Song Chun

    reweighting the energy function. We construct ELMs in the model space for two classic statistical learning, two-step EM and Swendsen-Wang cuts, in the energy landscapes. 1. Introduction. In many statisticalQUARTERLY OF APPLIED MATHEMATICS VOLUME , NUMBER 0 XXXX XXXX, PAGES 000­000 MAPPING ENERGY

  7. Lessons Learned Quarterly Report, March 2007

    Broader source: Energy.gov [DOE]

    Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Of?ce of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the NEPA process. The Of?ce began by presenting cost and time metrics and “What Worked and What Didn’t Work.” Other features were soon introduced.

  8. Lessons Learned Quarterly Report, December 2007

    Office of Energy Efficiency and Renewable Energy (EERE)

    Welcome to the 53rd quarterly report on lessons learned in the NEPA process. Many in the Department’s NEPA Community were called on to give extraordinary time and resources to the preparation of key EISs issued recently and highlighted in this LLQR. We anticipate a busy 2008 as well.

  9. Lessons Learned Quarterly Report, December 2006

    Broader source: Energy.gov [DOE]

    Welcome to the 49th quarterly report on lessons learned in the NEPA process. In this issue, we feature the initiation of three signi?cant EISs: the Complex 2030 Supplemental Programmatic EIS, the Supplemental Yucca Mountain Repository EIS, and the expanded Yucca Mountain Rail EIS.

  10. Lessons Learned Quarterly Report, March 2006

    Broader source: Energy.gov [DOE]

    Welcome to the 46th quarterly report on lessons learned in the NEPA process. DOE’s senior managers play a vital role in NEPA implementation as evidenced by the settlement of Hanford NEPA litigation. Their participation in every EIS is important to ensure the scope and schedule support DOE’s needs, as shown by an analysis of EIS metrics in this issue.

  11. Lessons Learned Quarterly Report, June 2006

    Broader source: Energy.gov [DOE]

    Welcome to the 47th quarterly report on lessons learned in the NEPA process. The quality of our NEPA process affects the quality of DOE’s decisions. Our appreciation goes out to all the NCOs and NEPA Document Managers who work every day to build quality into NEPA documents.

  12. Lessons Learned Quarterly Report, June 2008

    Broader source: Energy.gov [DOE]

    Welcome to the 55th quarterly report on lessons learned in the NEPA process. We are pleased to feature the recent NAEP conference, Changing Climates, thanks to our on-the-scene reporter Carolyn Osborne. There are also several articles related to global climate change and NEPA.

  13. Lessons Learned Quarterly Report, December 1995

    Broader source: Energy.gov [DOE]

    This quarterly report summarizes the lessons learned for documents completed between July 1 and September 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs.

  14. Lessons Learned Quarterly Report, March 2005

    Broader source: Energy.gov [DOE]

    Welcome to the 42nd quarterly report on lessons learned in the NEPA process. We are pleased to introduce our new Assistant Secretary for Environment, Safety and Health. John Spitaleri Shaw is a strong supporter of good NEPA compliance, as evidenced during our interview with him and in his February 16, 2005, memorandum, both of which are summarized in this issue.

  15. Lessons Learned Quarterly Report, June 2000

    Broader source: Energy.gov [DOE]

    Welcome to the 23rd quarterly report on lessons learned in theNEPA process. This issue features highlights from the May 2000 NEPA Compliance Officers Meeting. Also featured is an article on NEPA and the wildfire at Los Alamos. This is an unusually long issue, due simply to the abundance of information to be shared.

  16. Lessons Learned Quarterly Report, September 2004

    Broader source: Energy.gov [DOE]

    Welcome to the 40th quarterly report on lessons learned in the NEPA process. That’s 40 issues! Have you read them all? We are pleased to feature the July 2004 NEPA Community Meeting in this issue, as well as our annual update of the cumulative index to LLQR.

  17. Lessons Learned Quarterly Report, December 2005

    Broader source: Energy.gov [DOE]

    Welcome to the 45th quarterly report on lessons learned in the NEPA process. We thank all those who participated in the NEPA 35 conference. You made it successful. We hope you are as inspired as we are by the spirit of NEPA Section 101and the challenge to improve the implementation of NEPA.

  18. Lessons Learned Quarterly Report, September 2003

    Broader source: Energy.gov [DOE]

    Welcome to the 36th quarterly report on lessons learned in the NEPA process. We are pleased to feature the July 2003 NEPA Community Meeting in this issue. Also, please note that the cumulative index, a useful reference tool, is printed in this issue.

  19. Lessons Learned Quarterly Report, June 2005

    Broader source: Energy.gov [DOE]

    Welcome to the 43rd quarterly report on lessons learned in the NEPA process. In this issue we take a look at our hard-working NEPA Compliance Of?cers, who share bits of wisdom (and a little humor) gained from their lessons learned implementing NEPA. Countless thanks to all NCOs for their dedication, ?exibility, and perseverance.

  20. Lessons Learned Quarterly Report, March 1996

    Broader source: Energy.gov [DOE]

    Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPArelated information, and enhanced the format for better clarity and overall readability.

  1. Quarterly Report for October -December 1999

    E-Print Network [OSTI]

    Stanford University

    Quarterly Report for October - December 1999 Stanford Geothermal Program DE-FG07-99ID13763 #12, 1999), but holding the experimental pressure as close as possible to a constant value. 1.1 BACKGROUND saturation in rocks to obtain steam-water relative permeability curves (Satik and Horne, 1998, Mahiya, 1999

  2. Lessons Learned Quarterly Report, June 2007

    Broader source: Energy.gov [DOE]

    Welcome to the 51st quarterly report on lessons learned in the NEPA process. This issue features collaboration as a key element of a successful NEPA process. Related articles discuss approaches to and bene?ts of collaboration and illustrate various applications.

  3. Augmented Reality for Close Quarters Combat

    SciTech Connect (OSTI)

    None

    2013-09-20

    Sandia National Laboratories has developed a state-of-the-art augmented reality training system for close-quarters combat (CQB). This system uses a wearable augmented reality system to place the user in a real environment while engaging enemy combatants in virtual space (Boston Dynamics DI-Guy). Umbra modeling and simulation environment is used to integrate and control the AR system.

  4. Augmented Reality for Close Quarters Combat

    ScienceCinema (OSTI)

    None

    2014-06-23

    Sandia National Laboratories has developed a state-of-the-art augmented reality training system for close-quarters combat (CQB). This system uses a wearable augmented reality system to place the user in a real environment while engaging enemy combatants in virtual space (Boston Dynamics DI-Guy). Umbra modeling and simulation environment is used to integrate and control the AR system.

  5. Quarterly coal report, April 1995--June 1995

    SciTech Connect (OSTI)

    NONE

    1995-11-01

    This document provides comprehensive information about U.S. coal production, distribution, imports, exports, prices, and consumption. Coke production, consumption, distribution, imports, and exports are also provided. This report presents compiled data for April thru June, and historical data for 1987 thru the first quarter of 1995.

  6. Quarterly Report for October -December 2000

    E-Print Network [OSTI]

    Stanford University

    Quarterly Report for October - December 2000 Stanford Geothermal Program DE-FG07-99ID13763 #12.4 CONTINUING AND FUTURE WORK 30 5. THE MEASUREMENT OF STEAM-WATER AND AIR-WATER CAPILLARY PRESSURE 31 5 as possible to a constant value. 1.1 BACKGROUND An X-ray CT technique has been used in recent years to measure

  7. Articles by subject : Topics : TECHNOLOGY QUARTERLY

    E-Print Network [OSTI]

    Amaral, Luis A.N.

    Articles by subject : Topics : TECHNOLOGY QUARTERLY Mining social networks Untangling the social of the office or social pecking order often receive quick callbacks, do not worry about calling other people, will exceed $15 billion by 2015. In the past five years IBM has spent more than $11 billion Mining social

  8. October 2007 CEELP Quarterly Environmental & Energy Newsletter

    E-Print Network [OSTI]

    Martin, Ralph R.

    October 2007 CEELP Quarterly Environmental & Energy Newsletter Issue 2 The following items appear in this edition: (1) Responsibilities for Energy Policy: Movements in Wales and Westminster (2) Meeting the Energy Challenge - A White Paper on Energy, 2007 (3) The Energy White Paper and Devolution (4) Energy Aspects

  9. Lessons Learned Quarterly Report, June 2009

    Broader source: Energy.gov [DOE]

    Welcome to the 59th quarterly report on lessons learned in the NEPA process. We are pleased to feature the DOE NCO meeting and the NAEP annual conference, where streamlining the NEPA process for Recovery Act projects and consideration of climate change in NEPA documents were both addressed. We’ve begun to follow up on suggestions from the NCO meeting (below).

  10. Quarterly coal report July--September 1995, February 1996

    SciTech Connect (OSTI)

    NONE

    1996-02-16

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for July through September 1995 and aggregated quarterly historical data for 1987 through the second quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  11. Lessons Learned Quarterly Report, September 2006

    Broader source: Energy.gov [DOE]

    Welcome to the 48th quarterly report on lessons learned in the NEPA process. We remember Lynton Caldwell, who promoted a vision of productive harmony – a balance of the interests of the environment and human society. The NEPA process remains a useful tool for pursuing that vision by integrating environmental analysis into the decisionmaking process. With this issue, we have completed 12 years of LLQR.

  12. Lessons Learned Quarterly Report, September 1995

    Broader source: Energy.gov [DOE]

    This quarterly report summarizes the lessons learned for documents completed between April 1 and June 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs. The report includes a Question and Answer section as well as guidance on selected topics.

  13. Lessons Learned Quarterly Report, September 2005

    Broader source: Energy.gov [DOE]

    Welcome to the 44th quarterly report on lessons learned in the NEPA process. This issue completes our 11th year publishing LLQR, and as we go to press, we’re preparing to mark an even more impressive milestone – our observance of the 35th anniversary of NEPA. We’re busily working on all the details that will make this a great conference. We hope to see YOU there.

  14. INEEL Radiological Control Performance Indicator Report - Quarterly

    SciTech Connect (OSTI)

    Hinckley, Frank Leroy

    1999-02-01

    This document provides a report of an analysis of the Radiological Control Program through the fourth quarter of Calendar Year (CY-98) and is the annual report for the Idaho National Engineering and Environmental Laboratory (INEEL). This Performance Indicator Report is provided in accordance with Article 133 of the INEEL Radiological Control Manual. The INEEL collective occupational radiation deep dose is 63.034 person-rem year to date, compared to a goal of 83.1 person-rem. During the fourth quarter, all areas experienced deletions of work resulting from the Maintenance Stand Down. This reduction in work is a primary factor in the difference in the year end dose and the ALARA goal. The work will be completed during CY-99. Beginning in CY-98, a numeric Radiological Performance Index (RPI) is being used to compare radiological performance. The RPI takes into consideration frequency and severity of events such as skin contaminations, clothing contaminations, spills, exposures to radiation exceeding limits, and positive internal dose. The RPI measures the cost of these events in cents per hour of radiological work performed. To make the RPI meaningful, tables have been prepared to show the facility that contributes to the values used. The data are compared on a quarterly basis to the prior year to show measurable performance.

  15. 2nd Quarter Transportation Report FY 2014

    SciTech Connect (OSTI)

    Gregory, L.

    2014-07-30

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.

  16. Quarterly Biomass Program/Clean Cities State Web Conference:...

    Broader source: Energy.gov (indexed) [DOE]

    Presentation from May 6, 2010 Biomass ProgramClean Cities State Web Conference. stateconference05062010feraci.pdf More Documents & Publications Quarterly Biomass ProgramClean...

  17. Natural gas imports and exports: First quarter report 1995

    SciTech Connect (OSTI)

    NONE

    1995-07-01

    The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This quarter`s focus is market penetration of gas imports into New England. Attachments show the following: % takes to maximum firm contract levels and weighted average per unit price for the long-term importers, volumes and prices of gas purchased by long-term importers and exporters, volumes and prices for gas imported on short-term or spot market basis, and gas exported short-term to Canada and Mexico.

  18. Fossil Energy Today - Fourth Quarter, 2012 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Coal and Power Training Course for State Department Risk Profiles Help Predict CO2 Storage Site Obstacles Fossil Energy Today, Issue No. 8, Fourth Quarter, 2012 More Documents...

  19. Short-term energy outlook. Quarterly projections, 2nd quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

  20. Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter

    SciTech Connect (OSTI)

    Lisbeth A. Mitchell

    2013-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information” requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

  1. Strategic Planning Session Fourth Quarter Fiscal Year 2013

    E-Print Network [OSTI]

    Howitt, Ivan

    Strategic Planning Session Fourth Quarter ­ Fiscal Year 2013 April ­ June 2013 Facilities Strategic Planning Session ­ Fourth Quarter FY 2013 GOAL #1 ­ Improve maintenance and operations% average for the year. Balanced Scorecard Category: Customer Perspective 10 Lead F. O. STATUS 53.80% 48

  2. http://edq.sagepub.com Economic Development Quarterly

    E-Print Network [OSTI]

    Saxenian, AnnaLee

    Economic Development Quarterly AnnaLee Saxenian Silicon Valley's New Immigrant High-Growth Entrepreneurs. at CALIFORNIA DIGITAL LIBRARY on September 20, 2007http://edq.sagepub.comDownloaded from #12;ECONOMIChttp://edq.sagepub.com Economic Development Quarterly DOI: 10.1177/0891242402016001003 2002; 16; 20

  3. U.S. ARMY GARRISON FORT WAINWRIGHT QUARTERLY UPDATE FOR

    E-Print Network [OSTI]

    U.S. ARMY GARRISON FORT WAINWRIGHT QUARTERLY UPDATE FOR ALASKA NATIVE TRIBES January 2013, Issue 30 This is a quarterly update on United States Army Garrison Fort Wainwright activities and issues of interest); the garrison's Command Sergeant Major American Indian/Alaska Native Heritage Month Observed at Fort Wainwright

  4. Quarterly coal report, July--September 1993

    SciTech Connect (OSTI)

    Not Available

    1994-02-18

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended.

  5. Quarterly Coal Distribution Report - Energy Information Administration

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry Natural GasNaturalOctober 2015 Alcohol. The familyPrimeQuarterly

  6. Review of a Proposed Quarterly Coal Publication

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    This Review of a Proposed Quartery Coal Publication contains findings and recommendations regarding the content of a new summary Energy Information Administration (EIA) coal and coke publication entitled The Quarterly Coal Review (QCR). It is divided into five sections: results of interviews with selected EIA data users; identification of major functions of the coal and coke industries; analysis of coal and coke data collection activities; evaluation of issues conerning data presentation including recommendations for the content of the proposed QCR; and comparison of the proposed QCR with other EIA publications. Major findings and recommendations are as follows: (1) User interviews indicate a definite need for a compehensive publication that would support analyses and examine economic, supply and demand trends in the coal industry; (2) the organization of the publication should reflect the natural order of activities of the coal and coke industries. Based on an analysis of the industries, these functions are: production, stocks, imports, exports, distribution, and consumption; (3) current EIA coal and coke surveys collect sufficient data to provide a summary of the coal and coke industries on a quarterly basis; (4) coal and coke data should be presented separately. Coke data could be presented as an appendix; (5) three geographic aggregations are recommended in the QCR. These are: US total, coal producing districts, and state; (6) coal consumption data should be consolidated into four major consumer categories: electric utilities, coke plants, other industrial, and residential commercial; (7) several EIA publications could be eliminated by the proposed QCR.

  7. Natural gas imports and exports, first quarter report 2000

    SciTech Connect (OSTI)

    None

    2000-06-01

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

  8. Quarterly progress report, July-September 1982

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    Our ability to characterize fuel shells was greatly improved this quarter by the installation of the Eikonix Image Acquisition System. Linking this system to the VAX 11/750 computer permits real-time imaging of radiographic plates. Analysis of the thermal transport experimental campaign continued. We found that the mass-ablation rate was significantly higher for spherical targets than for planar targets. The ablation rate was also greater for 0.53 ..mu..m light used in similar experiments performed earlier. The analysis of the emission of light at 3/2 omego/sub 0/ and of the two-lobe feature detected in the thermal transport experiments has been examined and found to be consistent with the theory for two-plasmon decay. Further analysis of stimulated Brillouin scattering has shown the quenching of the process through a secondary process involving the decay of the primary ion acoustic wave into two secondary ion waves.

  9. Liber QuarterLy 20 (2), October 2010 iSSN: 1435-5205. P179199 http://liber.library.uu.nl/

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    is still quite new to a national library. A website differs from other types of publications in many waysLiber QuarterLy 20 (2), October 2010 ­ iSSN: 1435-5205. P179­199 http://liber.library.uu.nl/ igitur.0 unported License Liber Quarterly Volume 20 Issue 2 2010 179 Introducing Web Archives as a New Library

  10. Natural gas imports and exports. Fourth quarter report, 1998

    SciTech Connect (OSTI)

    NONE

    1998-12-31

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

  11. Letter from the Wind Program Director: Fourth Quarter 2013 |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jose Zayas, Wind and Water Power Technologies Office Director This is an excerpt from the Fourth Quarter 2013 edition of the Wind Program R&D Newsletter. A new year always presents...

  12. 54th Lessons Learned Quarterly Report, March 2008

    Broader source: Energy.gov [DOE]

    Welcome to the 54th quarterly report on lessons learned in the NEPA process. As noted in articles on recently issued DOE EISs (Complex Transformation, Yucca Mountain Repository and Railroad, and...

  13. THE MISOSYS QUARTERLY Volume 111.1 Summer 1988

    E-Print Network [OSTI]

    Mann, Tim

    #12;#12;THE MISOSYS QUARTERLY Volume 111.1 Summer 1988 Table of Contents The Blurb Little Brother Data Manager ........................... 56 PRO-WAM Windows & Applications ...................... 57 Data sheets on UPS/SPS ...............................59 The Hardware Corner

  14. Solar Energy Technologies Program Newsletter - First Quarter 2010

    SciTech Connect (OSTI)

    2010-04-22

    The first quarter 2010 edition of the Solar Energy Technologies Program newsletter summarizes the activities for the past three months, funding opportunities, highlights from the national labs, and upcoming events.

  15. Solar Energy Technologies Program Newsletter - Fourth Quarter 2009

    SciTech Connect (OSTI)

    DOE Solar Energy Technologies Program

    2009-12-31

    The Fourth Quarter 2009 edition of the Solar Energy Technologies Program newsletter summarizes the activities for the past three months, funding opportunities, highlights from the national labs, and upcoming events.

  16. Natural gas imports and exports. Second quarter report, 1998

    SciTech Connect (OSTI)

    1998-11-01

    The Office of Natural Gas and Petroleum Import and Export Activities prepared quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1998 (April through June). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

  17. Natural gas imports and exports. First quarter report, 1998

    SciTech Connect (OSTI)

    NONE

    1998-08-01

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the first quarter of 1998 (January through March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

  18. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    SciTech Connect (OSTI)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  19. EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)

    SciTech Connect (OSTI)

    West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.; Carper, Ross R.; Wiley, Julie G.; Beckman, Mary T.

    2010-04-20

    The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

  20. Quarterly Business Review FY 2009 2nd Quarter Financial Results May 21, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAboutXuRod Hunt (208) 386-5254 Washington575MAY 2009 QUARTERLY

  1. Quarterly Business Review FY 2009 3rd Quarter Financial Results August 11, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAboutXuRod Hunt (208) 386-5254 Washington575MAY 2009 QUARTERLY

  2. Quarterly Business Review FY 2009 3rd Quarter Financial Results August 11, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAboutXuRod Hunt (208) 386-5254 Washington575MAY 2009 QUARTERLY2,

  3. Quarterly Business Review FY 2009 3rd Quarter Financial Results August 11, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAboutXuRod Hunt (208) 386-5254 Washington575MAY 2009 QUARTERLY2,

  4. Quarterly Business Review FY 2009 3rd Quarter Financial Results August 11, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAboutXuRod Hunt (208) 386-5254 Washington575MAY 2009 QUARTERLY2,3,

  5. OE Releases 2013 Issue 4 of Energy Emergency Preparedness Quarterly (October 2013)

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability (OE) has released Volume 2, Issue 4 of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter.

  6. Yucca Mountain Site Characterization Project technical data catalog quarterly supplement

    SciTech Connect (OSTI)

    1995-03-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  7. Yucca Mountain Site Characterization Project Technical Data Catalog (Quarterly supplement)

    SciTech Connect (OSTI)

    1993-12-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  8. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    SciTech Connect (OSTI)

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  9. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    SciTech Connect (OSTI)

    1993-06-30

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993.

  10. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    SciTech Connect (OSTI)

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  11. Architecture, Engineering and Construction Sustainability Report Major Projects Quarterly Sustainability Report

    E-Print Network [OSTI]

    Kamat, Vineet R.

    1 Architecture, Engineering and Construction Sustainability Report Major Projects Quarterly Sustainability Report June 2011 Alice Crocker Lloyd Hall Renovation

  12. Page 1 of 6 Workgroup Activities Workgroup Activities Fourth Quarter 2013

    E-Print Network [OSTI]

    this year. Activities for the Fourth Quarter of 2013: Finishing the modeling plan. Preparing a coring of the Bioanalytical Year 1 Progress report (sent to workgroup for comment). Activities for the Fourth Quarter of 2013Page 1 of 6 Workgroup Activities Workgroup Activities ­ Fourth Quarter 2013 A. Contaminant Fate

  13. 2010 -2011 Quarterly Wage Comparison for FAU graduates Table of Contents

    E-Print Network [OSTI]

    Fernandez, Eduardo

    2010 - 2011 Quarterly Wage Comparison for FAU graduates #12;Table of Contents Executive Summary post-graduation outcome data, including the average quarterly earnings for State University System (SUS SUS institution were included in the major table. The average quarterly wage earned by FAU graduates

  14. Program, Course or Contract Title: Energy Systems & Climate Change Quarter and Academic Year: Fall 2009

    E-Print Network [OSTI]

    2009 In fall quarter, we studied the science of conventional energy sources, their costs and benefits alternative and renewable energy sources less formally, and will focus on these in winter quarter. We learnedProgram, Course or Contract Title: Energy Systems & Climate Change Quarter and Academic Year: Fall

  15. Energy programs. Quarterly report, January-March 1980

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The Johns Hopkins University Applied Physics Laboratory, is engaged in developing energy resource, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the US Naval Air Station, Norfolk, Va.

  16. The Savannah River Site's Groundwater Monitoring Program, first quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  17. The Savannah River Site's Groundwater Monitoring Program, second quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  18. The Savannah River Site's Groundwater Monitoring Program, third quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  19. INL FY2014 1st Quarterly Performance Analysis

    SciTech Connect (OSTI)

    Loran Kinghorn

    2014-07-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 76 occurrence reports and over 16 other deficiency reports (including not reportable events) identified at the INL during the period of October 2013 through December 2013. Battelle Energy Alliance (BEA) operates the INL under contract DE AC 07 051D14517

  20. Coal gasification. Quarterly report, July-September 1979

    SciTech Connect (OSTI)

    None

    1980-07-01

    The status of 18 coal gasification pilot plants or supporting projects supported by US DOE is reviewed under the following headings: company involved, location, contract number, funding, gasification process, history, process description, flowsheet and progress in the July-September 1979 quarter. (LTN)

  1. Ocean energy systems. Quarterly report, July-September 1982

    SciTech Connect (OSTI)

    Not Available

    1982-09-30

    This quarterly report summarizes work on the following tasks as of September 30, 1982: (1) OTEC pilot plant conceptual design review; (2) OTEC methanol; (3) financial and legal considerations in OTEC implementation; (4) GEOTEC resource exploration at Adak, Alaska, and Lualualei, Hawaii; (5) preliminary GEOTEC plant cost estimates; and (6) supervision of testing of pneumatic wave energy conversion system.

  2. Ocean thermal energy. Quarterly report, April-June 1982

    SciTech Connect (OSTI)

    Not Available

    1982-06-30

    This quarterly report includes summaries of the following tasks: (1) OTEC pilot plant conceptual design review; (2) OTEC methanol; (3) management decision requirements for OTEC construction; (4) hybrid geothermal - OTEC (GEOTEC) power plant performance estimates; and (5) supervision of testing of pneumatic wave energy conversion system.

  3. Sanitary landfill groundwater monitoring data. First quarter 1992

    SciTech Connect (OSTI)

    Thompson, C.Y.

    1992-05-01

    This report for first quarter 1992 contains sanitary landfill groundwater monitoring data for the Savannah River Plant. The data tables presented in this report are copies of draft analytical results and therefore do contain errors. These errors will be corrected when the finalized data is received from the laboratory.

  4. Transi oning At the beginning of each fall quarter,

    E-Print Network [OSTI]

    Transi oning between D G S At the beginning of each fall quarter, TGS hosts "DGS 101," offering useful resources to faculty new to their role. During this orienta on, TGS staff brief new DGSes on their du es and responsibili es , the admissions process, TGS policies, and other per nent informa on. Best

  5. Cornell's quarterly magazine spring 2012 CornellnYC tech launches

    E-Print Network [OSTI]

    Angenent, Lars T.

    an intensely fought competition to build a 2 million- square-foot tech campus in New York City. The universityCornell's quarterly magazine spring 2012 Soaring frontier for graduate StudentS CornellnYC tech of Dan Huttenlocher, vice provost and founding dean of the CornellNYC Tech campus. Photo by Robert Barker

  6. Published quarterly by the Office of Official Publica-

    E-Print Network [OSTI]

    Rock, Chris

    at our program offerings and other information contained in this catalog. New students at Texas Tech#12;Published quarterly by the Office of Official Publica- tions, Box 42026, Texas Tech University to Bulletin of Texas Tech University, Official Publica- tions, Box 42026, Texas Tech University, Lubbock

  7. Dept. for Speech, Music and Hearing Quarterly Progress and

    E-Print Network [OSTI]

    Carlson, Rolf

    Dept. for Speech, Music and Hearing Quarterly Progress and Status Report An experimental dialogue overview of the system and describe some of the components in more detail. Application specrJic data are collected with the help of Wizard- of-Oz techniques. The dialogue system is used during the data collection

  8. Philippine Quarterly of Culture & Society 13 (1985): 282-296

    E-Print Network [OSTI]

    Belsky, Jill M.

    1985-01-01

    Philippine Quarterly of Culture & Society 13 (1985): 282-296 SOME SOCIOECONOMIC AND ENVIRONMENTAL ASPECTS OF FOREST USE BY LOWLAND FARMERS IN LEYTE, PHILIPPINES AND THEIR IMPLICATIONS FOR AGRICULTURAL, Philippines provide an important source of annual food crops, perennial cash crops, and rattan and timber

  9. Next-Generation Ecosystem Experiments NGEE Arctic Quarterly Report

    E-Print Network [OSTI]

    System Models and reduce uncertainty and improve prediction of climate impacts and change in high System Models. Details at a Glance Activities during the October 1 to December 31 quarter include: A two, Chonggang Xu, Thomas Rahn, and Claudia Mora Earth and Environmental Sciences Division & Computational Earth

  10. Ocean thermal energy. Quarterly report, January-March 1982

    SciTech Connect (OSTI)

    Not Available

    1982-03-30

    This quarterly report summarizes work of the following tasks as of March 31, 1982: OTEC pilot plant conceptual design review; OTEC methanol; review of electrolyzer development programs and requirements; financial and legal considerations in OTEC implementation; potential Navy sites for GEOTEC systems; hybrid geothermal-OTEC power plants: single-cycle performance estimates; and supervision of testing of pneumatic wave energy conversion system.

  11. Name: Intended quarter of entry: Academic Planning Worksheet for Geography

    E-Print Network [OSTI]

    Name: Intended quarter of entry: Academic Planning Worksheet for Geography This worksheet before transfer. Visit the general catalog for more information on this major: www.washington.edu/students/gencat/academic/geography&S - Economic Geography GEOG 230 I&S - Global Inequality GEOG 277 I&S - Geography of Cities Additional

  12. Name: Intended quarter of entry: Academic Planning Worksheet for Bioengineering

    E-Print Network [OSTI]

    Name: Intended quarter of entry: Academic Planning Worksheet for Bioengineering This worksheet is available at http://engr.washington.edu/uapp. The Bioengineering major course sequence begins in spring for more information on this major: www.washington.edu/students/gencat/academic/bioengineering.html Courses

  13. Environmental Resources Management ERM | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbH JumpEllenville,Power Corp Jump to: navigation, searchResources

  14. US Energy Industry Financial Developments, 1993 fourth quarter, April 1994

    SciTech Connect (OSTI)

    Not Available

    1994-04-14

    This report traces key financial trends in the US energy industry for the fourth quarter of 1993. Financial data (only available for publicly-traded US companies) are included in two broad groups -- fossil fuel production and rate-regulated electric utilities. All financial data are taken from public sources such as energy industry corporate reports and press releases, energy trade publications, and The Wall Street Journal`s Earnings Digest; return on equity is calculated from data available from Standard and Poor`s Compustat data service. Since several major petroleum companies disclose their income by lines of business and geographic area, these data are also presented in this report. Although the disaggregated income concept varies by company and is not strictly comparable to corporate income, relative movements in income by lines of business and geographic area are summarized as useful indicators of short-term changes in the underlying profitability of these operations. Based on information provided in 1993 fourth quarter financial disclosures, the net income for 82 petroleum companies -- including 18 majors -- was unchanged between the fourth quarter of 1992 and the fourth quarter of 1993. An 18-percent decline in crude oil prices resulted in a deterioration of the performance of upstream (oil and gas production) petroleum companies during the final quarter of 1993. However, prices for refined products fell much less than the price of crude oil, resulting in higher refined product margins and downstream (refining, marketing and transport) petroleum earnings. An increase in refined product demand also contributed to the rise in downstream income.

  15. Quarterly Report - May through July 2012

    SciTech Connect (OSTI)

    Miller, Laniece E.

    2012-08-09

    The first quarter of my postgraduate internship has been an extremely varied one, and one which I have tackled several different aspects of the project. Because this is the beginning of a new investigation for the Research Library, I think it is appropriate that I explore data management at LANL from multiple perspectives. I have spent a considerable amount of time doing a literature search and taking notes on what I've been reading in preparation for potential writing activities later. The Research Library is not the only research library exploring the possibility of providing services to their user base. The Joint Information Systems Committee (JISC) and the Digital Curation Centre (DCC) in the UK are actively pursuing possibilities to preserve the scientific record. DataOne is a U.S. National Science Foundation (NSF) initiative aimed at helping to curate bioscience data. This is just a tiny sample of the organizations actively looking into the issues surrounding data management on an organizational, cultural, or technical level. I have included a partial bibliography of some papers I have read. Based on what I read, various discussions, and previous library training, I have begun to document the services I feel I could provide researchers in the context of my internship. This is still very much a work in progress as I learn more about the landscape in libraries and at the Laboratory. I have detailed this process and my thoughts on the issue below. As data management is such a complex and interconnected activity, it is impossible to investigate the organizational and cultural needs of the researchers without familiarizing myself with technologies that could facilitate the local cataloging and preservation of data sets. I have spent some time investigating the repository software DSpace. The library has long maintained the digital object repository aDORe, but the differences in features and lack of a user interface compared to DSpace have made DSpace a good test bed for this project. However my internship is not about repository software and DSpace is just one potential tool for supporting researchers and their data. More details my repository investigation. The most exciting aspect of the project thus far has been meeting with researchers, some of which are potential collaborators. Some people I have talked with have been very interested and enthusiastic about the possibility of collaborating, while others have not wanted to discuss the issue at all. I have had discussions with individual researchers managing their own lab as well as with researchers who are part of much larger collaborations. Three of the research groups whom I feel are of particular interest are detailed below. I have added an appendix below which goes into more detail about the protein crystallography community which has addressed the complete data life cycle within their field end to end. The issue of data management is much bigger than just my internship and there are several people and organizations exploring the issues at the Laboratory. I am making every effort to stay focused on small science data sets and ensure that my activities use standards-based approaches and are sustainable.

  16. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    SciTech Connect (OSTI)

    1998-10-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  17. The Savannah River Site's Groundwater Monitoring Program: Fourth quarter 1991

    SciTech Connect (OSTI)

    Rogers, C.D. )

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  18. Sanitary landfill groundwater monitoring report. First Quarter 1995

    SciTech Connect (OSTI)

    1995-06-01

    This report contains analytical data for samples taken during first quarter 1994 from wells of the LFW series located at the Sanitary Landfill Operating permit (DWP-0874A). The report presents monitoring results that equaled or exceeded the Safe Drinking Water Act final Primary Drinking Water Standards (PDWS) or screening levels, established by the US Environmental Protection Agency, the South Carolina final Primary Drinking Water Standard for lead, or the SRS flagging criteria.

  19. Program Update: 1st Quarter 2015 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st Quarter 2015

  20. Program Update: 2nd Quarter 2010 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st Quarter 20152nd

  1. Program Update: 2nd Quarter 2014 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st Quarter

  2. Program Update: 2nd Quarter 2015 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st QuarterProgram

  3. Program Update: 4th Quarter 2010 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st4th Quarter

  4. Lessons Learned Quarterly Report, June 2012 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA PublicLED ADOPTION REPORTLand2 Lessons Learned Quarterly

  5. Lessons Learned Quarterly Report, June 2013 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA PublicLED ADOPTION REPORTLand2 Lessons Learned Quarterly3

  6. Quarterly Nuclear Deployment Scorecard - April 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |Project Management|EnergyApril 2015 Quarterly

  7. 4Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from October to December   2008. Data for these indicators are  gathered by Field...

  8. 1Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from January to March 2009. Data for these indicators are gathered by Field...

  9. 3Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2007. Data for these indicators are gathered by Field...

  10. 1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from January to March  2003. Data for these indicators are gathered by Field...

  11. 3Q C&2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from July to September   2008. Data for these indicators aregathered by Field...

  12. 2Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from April to June  2009. Data for these indicators are gathered by Field elements...

  13. 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators QuarterlyReport covering the period from April to June 2008. Data for these indicators aregathered by Field elements...

  14. Advanced turbine systems program conceptual design and product development quarterly report, May--July 1995

    SciTech Connect (OSTI)

    1995-08-01

    Progress for the quarter is reported in the areas of system definition and analysis and design and test of critical components.

  15. 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field...

  16. Second and Third Quarter Hanford Seismic Report for Fiscal Year 2001

    SciTech Connect (OSTI)

    Hartshorn, Donald C.; Reidel, Stephen P.; Rohay, Alan C.; Valenta, Michelle M.

    2001-09-28

    This report describes the seismic activity on the Hanford Site during the 2nd and 3rd quarters of FY01

  17. 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field...

  18. 1Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from January to March2010. Data for these indicators are gathered by Field...

  19. 1Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January  to March 2006. Data for these indicators are gathered by Field...

  20. 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by field elements...

  1. 4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2005. Data for these indicators are gathered by Field...

  2. 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2006. Data for these indicators are gathered by Field elements...

  3. 3Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from July to September 2009. Data for these indicators are gathered by Field...

  4. 2Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the highlight of, and announces the availablity on-line of, the Facility Representative (FR) Program Performance Indicators are gathered by Field elements quarterly per...

  5. 3Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representative Program Indicators (Pis) Quarterly Report attached, covering the period from July to September 2000. Data for these indicators are gathered by the Field elements...

  6. 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were...

  7. 2Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period April through June 20 1 1. Data for these indicators were gathered...

  8. 4Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October through December 2011. Data for these indicators were...

  9. 3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these...

  10. 4Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period October through December 2010. Data for these...

  11. 1Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period January through March 2011. Data for these indicators were gathered...

  12. 1Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January to March 2001. Data for these indicators are gathered by the Field...

  13. 4Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from October to December 2009. Data for these indicators are gathered by Field...

  14. 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July  through September 2011. Data for these indicators were gathered...

  15. Next Generation Hydrogen Station Composite Data Products: Data through Quarter 2 of 2013

    SciTech Connect (OSTI)

    Sprik, S.; Kurtz, J.; Ainscough, C.; Post, M.; Saur, G.; Peters, M.

    2013-11-01

    This report includes 18 composite data products (CDPs) produced for next generation hydrogen stations, with data through quarter 2 of 2013.

  16. 2Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April through June 2012. Data for these indicators were...

  17. 4Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from October to December  2001. Data for these indicators are gathered by the Field...

  18. 3Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July to September 2001. Data for these indicators are gathered by the Field...

  19. First and Second Quarters Hanford Seismic Report for Fiscal Year 2005

    SciTech Connect (OSTI)

    Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.; Sweeney, Mark D.; Clayton, Ray E.

    2004-12-09

    This report describes the earthquakes that occurred in the Hanford seismic monitoring network during the first and second quarters of Fiscal Year 2005

  20. Stationary Fuel Cell System Composite Data Products: Data through Quarter 4 of 2013

    SciTech Connect (OSTI)

    Saur, G.; Kurtz, J.; Ainscough, C.; Peters, M.

    2014-05-01

    This report includes 25 composite data products (CDPs) produced for stationary fuel cell systems, with data through the fourth quarter of 2013.

  1. Next Generation Hydrogen Station Composite Data Products: Data through Quarter 4 of 2013

    SciTech Connect (OSTI)

    Sprik, S.; Kurtz, J.; Peters, M.

    2014-05-01

    This report includes 25 composite data products (CDPs) produced for next generation hydrogen stations, with data through quarter 4 of 2013.

  2. Stationary Fuel Cell System Composite Data Products: Data through Quarter 2 of 2013

    SciTech Connect (OSTI)

    Ainscough, C.; Kurtz, J.; Peters, M.; Saur, G.

    2013-11-01

    This report includes 24 composite data products (CDPs) produced for stationary fuel cell systems, with data through the second quarter of 2013.

  3. 4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    "Attached is the Facility Representative (FR) Program Performance Indicators QuarterlyReport covering the period from October to December 2007. Data for these indicators aregathered by Field...

  4. Calorimetry Exchange Program Quarterly Data Report, 4th Quarter CY91

    SciTech Connect (OSTI)

    McClelland, T.M.

    1996-07-01

    The goals of the Calorimetry Sample Exchange Program are: (1) Discuss measurement differences, (2) Review and improve analytical measurements and methods, (3) Discuss new measurement capabilities, (4) Provide data to DOE on measurement capabilities to evaluate shipper-receiver differences, (5) Provide characterized or standard materials as necessary for exchange participants, (6) Provide a measurement control program for plutonium analysis. A sample of PuO{sub 2} powder is available at each participating site for NDA measurement, including either or both calorimetry and high-resolution gamma-ray spectroscopy, the elements which are typically combined to provide a calorimetric assay of plutonium. The facilities measure the sample as frequently and to the level of precision which they desire, and then submit the data to the Exchange for analysis. Statistical tests are used to evaluate the data and to determine if there are significant differences from accepted values for the exchange sample or from data previously reported by that facility. This information is presented, in the form of a quarterly report, intended for use by Exchange participants in measurement control programs, or to indicate when bias corrections may be appropriate. No attempt, however, has been made to standardize methods or frequency of data collection, calibration, or operating procedures. Direct comparisons between laboratories may, therefore, be misleading since data have not been collected to the same precision or for the same time periods. A meeting of the participants of the Calorimetry Exchange is held annually at EG&G Mound Applied Technologies. The purposes of this meeting are to discuss measurement differences, problems, and new measurement capabilities, and to determine the additional activities needed to fulfill the goals of the Exchange.

  5. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983

    SciTech Connect (OSTI)

    1983-01-01

    In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

  6. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984

    SciTech Connect (OSTI)

    1984-01-01

    At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

  7. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983

    SciTech Connect (OSTI)

    1983-01-01

    In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating the location of currently operating facilities is provided as Figure A. Of the 240 signed contracts and committed projects, 75 were cogeneration, solid waste, or biomass projects with a potential of 740 MW. PG and E also had under active discussion 32 cogeneration projects that could generate a total of 858 MW to 921 MW, and 10 solid waste/biomass projects with a potential of 113 MW to 121 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 19, with a generating capability of 471 MW. Also, discussions are being conducted with 12 wind farm projects, totaling 273 to 278 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 10 other projects under active discussion. There are 47 hydroelectric projects with signed contracts and a potential of 110 MW, as well as 65 projects under active discussion for 175 MW. In addition, there are 30 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of June 30, 1983.

  8. Natural Gas Imports and Exports. Third Quarter Report 1999

    SciTech Connect (OSTI)

    none

    1999-10-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditions and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline network and their planned in-service dates.

  9. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission. Second Quarter 1984

    SciTech Connect (OSTI)

    1984-01-01

    At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 334, with total estimated nominal capacity of 2,876 MW. Of these totals, 232 projects, capable of producing 678 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration projects had signed 80 contracts with a potential of 1,161 MW. Thirty-three contracts had been signed for solid waste/biomass projects for a total of 298 MW. In total, 118 contracts and letter agreements had been signed with cogeneration, solid waste, and biomass projects capable of producing 1,545 MW. PG and E also had under active discussion 46 cogeneration projects that could generate a total of 688 MW to 770 MW, and 13 solid waste or biomass projects with a potential of 119 MW to 139 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. Two geothermal projects were under active discussion for a total of 2 MW. There were 8 solar projects with signed contracts and a potential of 37 MW, as well as 4 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 34, with a generating capability of 1,042 MW, Also, discussions were being conducted with 23 wind farm projects, totaling 597 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 7 other small wind projects under active discussion. There were 71 hydroelectric projects with signed contracts and a potential of 151 MW, as well as 76 projects under active discussion for 505 MW. In addition, there were 18 hydroelectric projects, with a nominal capacity of 193 MW, that PG and E was planning to construct. Table B displays the above information. Appendix A displays in tabular form the status reports of the projects as of June 30, 1984.

  10. Application of Bioenergetics Models to Research and Management Spring Quarter 2011, 4 credits

    E-Print Network [OSTI]

    Washington at Seattle, University of

    Application of Bioenergetics Models to Research and Management Fish 530 Spring Quarter 2011, 4 credits Instructor: Dave Beauchamp davebea@uw.edu Office FSH 220B Bioenergetically-based food web models. #12;Syllabus Fish 530: Application of Bioenergetics Models to Research and Management Winter Quarter

  11. Name: Intended quarter of entry: University of Washington | Office of Admissions | April 2013

    E-Print Network [OSTI]

    /117 NW QSR ­ General Physics PHYS 115/118 NW QSR ­ General Physics PHYS 116/119 NW QSR ­ General Physics and plan for admission to your intended major and University general education requirements. As progress quarter and January 5 for spring quarter. Visit the general catalog for more information on this major

  12. THE LDOS QUARTERLY January 1, 1983 Volume 2, Number 1 Table of Contents

    E-Print Network [OSTI]

    Mann, Tim

    #12;#12;Page 1 THE LDOS QUARTERLY January 1, 1983 Volume 2, Number 1 Table of Contents INTRODUCTION the MISOSYS Partitioned Data Set utility ...................... Page 24 NEWSCRIPT + REFLEX/FLT - An update ................................................. Page 54 Back to the basics of JCL, plus the question of the quarter LES INFORMATION - by Les Mikesell

  13. The Savannah River site`s groundwater monitoring program: second quarter 1997

    SciTech Connect (OSTI)

    Rogers, C.D. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-11-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  14. Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report. Fourth quarter 1992 and 1992 summary

    SciTech Connect (OSTI)

    Thompson, C.Y.

    1993-03-01

    During fourth quarter 1992, samples from 18 groundwater monitoring wells of the AMB series at the Metallurgical Laboratory Hazardous Waste Management Facility were analyzed for certain heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. Six parameters exceeded final Primary Drinking Water Standards (PDWS) and the Savannah River Site Flag 2 criteria during the quarter. The results for fourth quarter 1992 are fairly consistent with the rest of the year`s data. Tetrachloroethylene exceeded the final PDWS in well AMB 4D only two of the four quarters; in the other three wells in which it was elevated, it was present at similar levels throughout the year. Trichloroethylene consistently exceeded its PDWS in wells AMB 4A, 4B, 4D, 5, and 7A during the year. Trichloroethylene was elevated in well AMB 6 only during third and fourth quarters and in well AMB 7 only during fourth quarter. Total alpha-emitting radium was above the final PDWS for total radium in well AMB 5 at similar levels throughout the year and exceeded the PDWS during one of the three quarters it was analyzed for (third quarter 1992) in well AMB 10B.

  15. Atmospheric Radiation Measurement program climate research facility operations quarterly report.

    SciTech Connect (OSTI)

    Sisterson, D. L.; Decision and Information Sciences

    2006-09-06

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period April 1 through June 30, 2006, for the fixed and mobile sites. Although the AMF is currently up and running in Niamey, Niger, Africa, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The third quarter comprises a total of 2,184 hours. For all fixed sites (especially the TWP locale) and the AMF, the actual data availability (and therefore actual hours of operation) exceeded the individual (and well as aggregate average of the fixed sites) operational goal for the third quarter of fiscal year (FY) 2006.

  16. The AMTEX Partnership. Third quarterly report, FY 1995

    SciTech Connect (OSTI)

    Lemon, D.K.; Quisenberry, R.K.

    1995-06-01

    Key activities for the quarter were the initiation of tactical work on the OPCon Project, development of a draft of the AMTEX Policies and Procedures document, and a meeting of the Industry Technical Advisory Committee. A significant milestone was reached when a memorandum of understanding was signed between the DOE and The Department of Commerce. The agreement signified the official participation of the National Institute of Standards and Technology on the Demand Activated Manufacturing Architecture (DAMA) project in AMTEX. Project accomplishments are given for: computer-aided manufacturing, cotton biotechnology, DAMA, electronic embedded fingerprints, rapid cutting, sensors for agile manufacturing, and textile resource conservation.

  17. Sanitary landfill groundwater monitoring report. Third quarter 1995

    SciTech Connect (OSTI)

    1995-11-01

    This report contains analytical data for samples taken during third quarter 1995 from wells of the LFW series located at the Sanitary Landfill at the Savannah River Site (SRS). The data are submitted in reference to the Sanitary Landfill Operating Permit (DWP-087A). The report presents monitoring results that equaled or exceeded the Safe Drinking Water Act final Primary Drinking Water Standards (PDWS) or screening levels, established by the U.S. Environmental Protection Agency, the South Carolina final Primary Drinking Water Standard for lead, or the SRS flagging criteria.

  18. Recommendation 179: DOE Quarterly Project Reviews | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOA Applicant WebinarSouthernOTDevelopment on the Oak9: DOE Quarterly

  19. Energy Emergency Preparedness Quarterly Vol 3, Issue 1 - January 2014 |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor Innovative Solar PowerTribesDepartment of Energy each quarter.

  20. Program Update: 1st Quarter 2011 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYSDepartment ofconducted4 TEE-0011The1st Quarter

  1. Quarterly Nuclear Deployment Summary, July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7, 2011 |1 DOEAssuranceApril 2012 QuarterlyJuly 2012

  2. S M Stoller Quarterly Sampling, STAR Center, Largo, FL

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the Weldon Spring,7=cr5rnPandAlba4227 SamplingQuarterly

  3. Program Update: 2nd Quarter 2012 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st Quarter 20152nd2

  4. Program Update: 2nd Quarter 2013 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st Quarter 20152nd23

  5. Program Update: 3rd Quarter 2010 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st QuarterProgram3rd

  6. Program Update: 4th Quarter 2009 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st4th Quarter 2009

  7. Program Update: 4th Quarter 2011 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | Department PrimusPetroleumProgram1st4th Quarter4th

  8. 75th Lessons Learned Quarterly Report Issued | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment| Department ofApplianceU.S.Department of5th quarterly report on lessons

  9. 76th Lessons Learned Quarterly Report Issued | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment| Department ofApplianceU.S.Department of5th quarterly report on

  10. Financial News for Major Energy Companies, Fourth Quarter 2005

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) |Final Report DocumentRates > Rates2Third Quarter

  11. Rocky Flats Site, Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the Weldon Spring,7=cr5rnPandAlba Craftaehsed Quarterly

  12. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the Weldon Spring,7=cr5rnPandAlba Craftaehsed Quarterly

  13. INEEL Radiological Control Performance Indicator Report - Quarterly for CY-99

    SciTech Connect (OSTI)

    Hinckley, Frank Leroy

    2000-02-01

    This Performance Indicator Report is provided in accordance with Article 133 of the INEEL Radiological Control Manual. The INEEL collective occupational radiation deep dose is 63.034 person-rem year to date, compared to a goal of 83.1 person-rem. During the fourth quarter, all areas experienced deletions of work resulting from the Maintenance Stand Down. This reduction in work is a primary factor in the difference in the year end dose and the ALARA goal. The work will be completed during CY-99. Beginning in CY-98, a numeric Radiological Performance Index (RPI) is being used to compare radiological performance. The RPI takes into consideration frequency and severity of events such as skin contaminations, clothing contaminations, spills, exposures to radiation exceeding limits, and positive internal dose. The RPI measures the cost of these events in cents per hour of radiological work performed. To make the RPI meaningful, tables have been prepared to show the facility that contributes to the values used. The data are compared on a quarterly basis to the prior year to show measurable performance.

  14. Natural gas imports and exports. Second quarter report 1995

    SciTech Connect (OSTI)

    NONE

    1995-12-31

    This quarter`s feature report focuses on natural gas exports to Mexico. OFP invites ideas from the public on future topics dealing with North American natural gas import/export trade. Such suggestions should be left on OFP`s electronic bulletin board. Natural Gas exports to Mexico continued to grow and reached an historic high for the month of June (7.8 Bcf). Two new long-term contracts were activated; Pennsylvania Gas & Water Company began importing 14.7 MMcf per day from TransCanada PipeLines Ltd., and Renaissance Energy (U.S.) Inc. began importing 2.8 MMcf per day from Renaissance Energy Ltd. for resale to Delmarva Power & Light Company. Algerian LNG imports remained stagnant with only one tanker being imported by Pan National Gas Sales, Inc. (Pan National). During the first six months of 1995, data indicates gas imports increased by about 10 percent over the 1994 level (1,418 vs. 1,285 Bcf), with Canadian imports increasing by 14 percent and Algerian imports decreasing by 81 percent. During the same time period, exports increased by 18 percent (83 vs. 70.1 Bcf).

  15. Third Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-09-01

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, fourteen local earthquakes were recorded during the third quarter of fiscal year 2008. The largest event recorded by the network during the third quarter (May 18, 2008 - magnitude 3.7 Mc) was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, five earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and three earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, eight earthquakes occurred in swarm areas and six earthquakes were classified as random events. The largest event recorded by the network during the third quarter occurred on May 18 (magnitude 3.7 Mc) and was located approximately 17 km east of Prosser at a depth of 20.5 km. This earthquake was the highest magnitude event recorded in the 46-47 N. latitude / 119-120 W. longitude sector since 1975. The May 18 event, not reported as being felt on the Hanford site or causing any damage, was communicated to the PNNL Operations Center per HSAP communications procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and the 400 Area were triggered by the May 18 event. The reportable action level of 2% g for Hanford facilities is approximately 12 times larger than the peak acceleration (0.17%) observed at the 300 Area SMA station and no action was required.

  16. NS&T Managment Observations - 1st Quarter

    SciTech Connect (OSTI)

    David Gianotto

    2014-06-01

    The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements’ expectations as they relate to safety, security, quality, and work performance. Management observations (observations) are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of management’s observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&T’s MOP.

  17. NS&T Management Observations - 3rd Quarter

    SciTech Connect (OSTI)

    David Gianotto

    2014-07-01

    The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements’ expectations as they relate to safety, security, quality, and work performance. Management observations are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of management’s observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&T’s MOP.

  18. Mirror fusion. Quarterly report, April-June 1981

    SciTech Connect (OSTI)

    Not Available

    1981-09-11

    The information in each Quarterly is presented in the same sequence as in the Field Work Package Proposal and Authorization System (WPAS) submissions prepared for the U.S. Department of Energy; the main sections are Applied Plasma Physics, Confinement Systems, Development and Technology, and Mirror Fusion Test Facility (Planning and Projects). On occasion, we shall include information pertaining to the LLNL role as Lead Laboratory for the Open Systems Mirror Fusion Program. Each of these sections is introduced by an overall statement of the goals and purposes of the groups reporting in it. As appropriate within each section, statements of the goals of individual programs and projects are followed by articles containing summaries of significant recent activity and descriptive text.

  19. First Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-03-29

    The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite interferometry that detected approximately 1 inch uplift in surface deformation along an east-west transect within the swarm area. The uplift is thought to be caused by the release of pressure that has built up in sedimentary layers, cracking the brittle basalt layers with the Columbia River Basalt Formation (CRBG) and causing the earthquakes. Similar earthquake swarms have been recorded near this same location in 1970, 1975 and 1988 but not with SMA readings or satellite imagery. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. The Wooded Island swarm, due its location and the limited magnitude of the events, does not appear to pose any significant risk to Hanford waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will persist or increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity. Outside of the Wooded Island swarm, sixteen earthquakes were recorded, all minor events. Seven earthquakes were located at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments and nine earthquakes at depths greater than 9 km, within the basement. Geographically, seven earthquakes were located in known swarm areas and nine earthquakes were classified as random events.

  20. Second Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-06-30

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 90 local earthquakes during the second quarter of FY 2010. Eighty-one of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter were a continuation of the swarm events observed during the 2009 and 2010 fiscal years and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2010). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (3.0 Mc) occurred February 4, 2010 at depth 2.4 km. The average depth of the Wooded Island events during the quarter was 1.6 km with a maximum depth estimated at 3.5 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford Strong Motion Accelerometer (SMA) network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Similar earthquake swarms have been recorded near this same location in 1970, 1975 and 1988 but not with SMA readings or satellite imagery. Prior to the 1970s, earthquake swarms may have occurred at this location or elsewhere in the Columbia Basin, but equipment was not in place to record those events. The Wooded Island swarm, due its location and the limited magnitude of the events, does not appear to pose any significant risk to Hanford waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will persist or increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity. Outside of the Wooded Island swarm, nine earthquakes were recorded, seven minor events plus two events with magnitude less than 2.0 Mc. Two earthquakes were located at shallow depths (less than 4 km), three earthquakes at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments, and four earthquakes were located at depths greater than 9 km, within the basement. Geographically, six earthquakes were located in known swarm areas and three earthquakes were classified as random events.

  1. Expedited Demolition Notification for 2nd Quarter CY 2012 Structures

    SciTech Connect (OSTI)

    Juarez, Catherine L. [Los Alamos National Laboratory

    2012-06-18

    The National Nuclear Security Administration and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are informing the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB) of the need to expedite the demolition of structures summarized in the enclosures. These structures have been identified to receive funding and be demolished prior to the 3rd Quarter Demolition Notification (June 30, 2012). This letter is a follow up to the email that was sent to the NMED-HWB on April 17, 2012. The enclosures attached to this letter satisfy the reporting requirements as outlined in Section 1.17 of the LANL Hazardous Facility Waste Permit (Permit). Demolition of buildings that appear on this list will not occur until 30 days after NMED has received this notification.

  2. Environmental Hazards Assessment Program. Quarterly report, April--June 1995

    SciTech Connect (OSTI)

    NONE

    1995-07-31

    The objectives of this report are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards, both chemical and radiation, on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes the progress made this quarter in the following areas: public and professional outreach; science programs; clinical programs; and information support and access systems.

  3. US energy industry financial developments, 1994 first quarter

    SciTech Connect (OSTI)

    Not Available

    1994-06-23

    This report traces key financial trends in the US energy industry for the first quarter of 1994. Financial data (only available for publicly-traded US companies) are included in two broad groups -- fossil fuel production and rate-regulated electric utilities. All financial data are taken from public sources such as energy industry corporate reports and press releases, energy trade publications, and The Wall Street Journal`s, Earnings Digest. Return on equity is calculated from data available from Standard and Poor`s Compustat data service. Since several major petroleum companies disclose their income by lines of business and geographic area. These data are also presented in this report. Although the disaggregated income concept varies by company and is not strictly comparable to corporate income, relative movements in income by lines of business and geographic area are summarized as useful indicators of short-term changes in the underlying profitability of these operations.

  4. US energy industry financial developments, First quarter 1995

    SciTech Connect (OSTI)

    1995-06-19

    This report traces key developments in US energy companies` financial performance for the first quarter of 1995. Financial data (only available for publicly-traded US companies) are included in two broad groups -- fossil fuel production and rate-regulated utilities. All financial data are taken from public sources such as corporate reports and press releases, energy trade publications, and The Wall Street Journal`s Earnings Digest. Return on equity is calculated from data available from Standard and Poor`s Compustat data service. Since several major petroleum companies disclose their income by lines of business and geographic area, these data are also presented in this report. Although the disaggregated income concept varies by company and is not strictly comparable to corporate income, relative movements in income by lines of business and geographic area are summarized as useful indicators of short-term changes in the underlying profitability of these operations.

  5. Second Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-06-26

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, seven local earthquakes were recorded during the second quarter of fiscal year 2008. The largest event recorded by the network during the second quarter (February 3, 2008 - magnitude 2.3 Mc) was located northeast of Richland in Franklin County at a depth of 22.5 km. With regard to the depth distribution, two earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), three earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and two earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, five earthquakes occurred in swarm areas and two earthquakes were classified as random events.

  6. Strategic Petroleum Reserve quarterly report, (July 1, 1990--September 30, 1990)

    SciTech Connect (OSTI)

    Not Available

    1990-11-15

    This November 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period July 1, 1990, through September 30, 1990. 4 tabs.

  7. [National Institute for Petroleum and Energy Research] quarterly technical report, October 1--December 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    Accomplishments for the past quarter are described for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology.

  8. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2012

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.; Ramsden, T.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the fourth quarter of 2012.

  9. Technology Development for Iron and Cobalt Fischer-Tropsch Catalysts Quarterly Report

    E-Print Network [OSTI]

    Kentucky, University of

    Technology Development for Iron and Cobalt Fischer-Tropsch Catalysts Quarterly Report July 1, 2001 cluster growth with time on-stream by a sintering process as a major component to the deactivation

  10. SITE-LEVEL SUMMARY (2Q) of FINAL-2ND-QUARTER-FY-2015-SCORECARD...

    Office of Environmental Management (EM)

    was not resolved during the quarter. N A (0 0) N A (0 0) N A N A SA Completed Energy Technology Engineering Center (ETEC) GREEN N A (0 0) N A (0 0) N A N A...

  11. Cooperative research program in coal liquefaction. Quarterly report, August 1, 1991--October 31, 1991

    SciTech Connect (OSTI)

    Huffman, G.P.

    1991-12-31

    This Quarterly Report on coal liquefaction research includes discussion in the areas of (1) Iron Based Catalysts for Coal Liquefaction; (2) Exploratory Research on Coal Conversion; (3) Novel Coal Liquefaction Concepts; (4) Novel Catalysts for Coal Liquefaction. (VC)

  12. 2Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from April to June 2001. Data for these indicators are gathered by the Field elements...

  13. 2Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "The Facility Representative Program Performance Indicators (PIs) Quarterly Report is attached, covering the period from April 2000 to June 2000. Data for these indicators are gathered by the Field...

  14. Physiological responses of mature Quarter Horses to reining training when fed conventional and fat supplemented diets 

    E-Print Network [OSTI]

    Rammerstorfer, Christian

    1996-01-01

    An initial experiment was conducted utilizing five mature Quarter Horses to establish baseline physiological responses to typical reining training. Heart rate and plasma lactate concentration indicated that galloping circles, spinning and stopping...

  15. ARRA Material Handling Equipment Composite Data Products: Data through Quarter 2 of 2012

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-10-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the second quarter of 2012.

  16. The Savannah River Site Groundwater Monitoring Program Fourth Quarter 2000 (October thru December 2000)

    SciTech Connect (OSTI)

    Dukes, M.D.

    2001-08-02

    This report summarizes the Groundwater Monitoring Program conducted by SRS during fourth quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program.

  17. Low-rank coal research. Quarterly technical progress report, April-June 1984

    SciTech Connect (OSTI)

    Not Available

    1984-08-01

    Papers in the quarterly technical progress report for the period April-June, 1984, of the Low-Rank Coal Research project have been entered individually into EDB and ERA (17 items). (LTN)

  18. ARRA Material Handling Equipment Composite Data Products: Data through Quarter 2 of 2013

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.

    2013-11-01

    This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the second quarter of 2013.

  19. 52 Plant Protection Quarterly Vol.18(2) 2003 The red coconut scale (Furcaspis oceanica

    E-Print Network [OSTI]

    Reddy, Gadi VP

    52 Plant Protection Quarterly Vol.18(2) 2003 Summary The red coconut scale (Furcaspis oceanica agent of the red coconut scale. Keywords: Scale insect, Furcaspis oceanica, Homoptera, Diaspididae, parasitoid, Adelencyrtus oceanicus, Hy- menoptera, Encyrtidae, coconut, biologi- cal control, Guam

  20. Photonic band gap of a graphene-embedded quarter-wave stack

    SciTech Connect (OSTI)

    Fan, Yuancheng; Wei, Zeyong; Li, Hongqiang; Chen, Hong; Soukoulis, Costas M

    2013-12-10

    Here, we present a mechanism for tailoring the photonic band structure of a quarter-wave stack without changing its physical periods by embedding conductive sheets. Graphene is utilized and studied as a realistic, two-dimensional conductive sheet. In a graphene-embedded quarter-wave stack, the synergic actions of Bragg scattering and graphene conductance contributions open photonic gaps at the center of the reduced Brillouin zone that are nonexistent in conventional quarter-wave stacks. Such photonic gaps show giant, loss-independent density of optical states at the fixed lower-gap edges, of even-multiple characteristic frequency of the quarter-wave stack. The conductive sheet-induced photonic gaps provide a platform for the enhancement of light-matter interactions.

  1. Stationary Fuel Cell System Composite Data Products: Data Through Quarter 4 of 2012

    SciTech Connect (OSTI)

    Ainscough, C.; Kurtz, J.; Saur, G.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes stationary fuel cell system composite data products for data through the fourth quarter of 2012.

  2. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2013

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Peters, M.

    2014-06-01

    This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the fourth quarter of 2013.

  3. Name: Intended quarter of entry: Academic Planning Worksheet for Aeronautics & Astronautics

    E-Print Network [OSTI]

    Name: Intended quarter of entry: Academic Planning Worksheet for Aeronautics & Astronautics://engr.washington.edu/uapp. Visit the general catalog for more information on this major: www.washington.edu/students/gencat/academic/aeronautics

  4. F-Area Acid/Caustic Basin groundwater monitoring report: Second quarter 1992

    SciTech Connect (OSTI)

    Thompson, C.Y.

    1992-09-01

    During second quarter 1992, samples from the six FAC monitoring wells at the F-Area Acid/Caustic Basin were analyzed for herbicides, indicator parameters, major ions, pesticides, radionuclides, turbidity, volatile organic compounds, and other constituents. Monitoring results that exceeded the US Environmental Protection Agency's Primary Drinking Water Standards (PDWS) or the Savannah River Site flagging criteria or turbidity standards during the quarter are the focus of this report.

  5. F-Area Acid/Caustic Basin groundwater monitoring report: Second quarter 1992

    SciTech Connect (OSTI)

    Thompson, C.Y.

    1992-09-01

    During second quarter 1992, samples from the six FAC monitoring wells at the F-Area Acid/Caustic Basin were analyzed for herbicides, indicator parameters, major ions, pesticides, radionuclides, turbidity, volatile organic compounds, and other constituents. Monitoring results that exceeded the US Environmental Protection Agency`s Primary Drinking Water Standards (PDWS) or the Savannah River Site flagging criteria or turbidity standards during the quarter are the focus of this report.

  6. Next Generation Hydrogen Station Composite Data Products: Data through Quarter 4 of 2014; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Sprik, S.; Kurtz, J.; Ainscough, C.; Peters, M.

    2015-05-14

    This publication includes 43 composite data products (CDPs) produced for next generation hydrogen stations, with data through the fourth quarter of 2014.

  7. An Aerial Robot Prototype for Situational Awareness in Closed Quarters William E. Green and Paul Y. Oh

    E-Print Network [OSTI]

    Oh, Paul

    call closed quarters ­ urban environments like stadiums, train stations, underground parking lots, observe hostages or casualties, assess structural dam- age or find explosives. We envision a CQAR fleet

  8. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4: July--September 1996

    SciTech Connect (OSTI)

    NONE

    1996-10-01

    This report presents significant accomplishments for the Oak Ridge Reservation`s environmental restoration projects for the fourth quarter of FY 1996.

  9. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 1 2012 Composite Data Products - Deployment (Presentation)

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

    2012-06-01

    This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). Quarter 1 2012 Composite Data Products - Deployment March 8, 2012.

  10. Stationary Fuel Cell System Composite Data Products: Data through Quarter 4 of 2014; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Saur, G.; Kurtz, J.; Ainscough, C.; Sprik, S.; Post, M.

    2015-04-01

    This publication includes 33 composite data products (CDPs) produced for stationary fuel cell systems, with data through the fourth quarter of 2014.

  11. Third Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-09-30

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 771 local earthquakes during the third quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during the January – March 2009 time period and reported in the previous quarterly report (Rohay et al, 2009). The frequency of Wooded Island events has subsided with 16 events recorded during June 2009. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 25 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.2 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest activity and individuals living in homes directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. The Hanford Strong Motion Accelerometer (SMA) network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration value recorded by the SMA network was approximately 3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressure that has built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity.

  12. FY12 Quarter 3 Computing Utilization Report – LANL

    SciTech Connect (OSTI)

    Wampler, Cheryl L. [Los Alamos National Laboratory; McClellan, Laura Ann [Los Alamos National Laboratory

    2012-07-25

    DSW continues to dominate the capacity workload, with a focus in Q3 on common model baselining runs in preparation for the Annual Assessment Review (AAR) of the weapon systems. There remains unmet demand for higher fidelity simulations, and for increased throughput of simulations. Common model baselining activities would benefit from doubling the resolution of the models and running twice as many simulations. Capacity systems were also utilized during the quarter to prepare for upcoming Level 2 milestones. Other notable DSW activities include validation of new physics models and safety studies. The safety team used the capacity resources extensively for projects involving 3D computer simulations for the Furrow series of experiments at DARHT (a Level 2 milestone), fragment impact, surety theme, PANTEX assessments, and the 120-day study. With the more than tripling of classified capacity computing resources with the addition of the Luna system and the safety team's imminent access to the Cielo system, demand has been met for current needs. The safety team has performed successful scaling studies on Luna up to 16K PE size-jobs with linear scaling, running the large 3D simulations required for the analysis of Furrow. They will be investigating scaling studies on the Cielo system with the Lustre file system in Q4. Overall average capacity utilization was impacted by negative effects of the LANL Voluntary Separation Program (VSP) at the beginning of Q3, in which programmatic staffing was reduced by 6%, with further losses due to management backfills and attrition, resulting in about 10% fewer users. All classified systems were impacted in April by a planned 2 day red network outage. ASC capacity workload continues to focus on code development, regression testing, and verification and validation (V&V) studies. Significant capacity cycles were used in preparation for a JOWOG in May and several upcoming L2 milestones due in Q4. A network transition has been underway on the unclassified networks to increase access of all ASC users to the unclassified systems through the Yellow Turquoise Integration (YeTI) project. This will help to alleviate the longstanding shortage of resources for ASC unclassified code development and regression testing, and also make a broader palette of machines available to unclassified ASC users, including PSAAP Alliance users. The Moonlight system will be the first capacity resource to be made available through the YETI project, and will make available a significant increase in cycles, as well as GPGPU accelerator technology. The Turing and Lobo machines will be decommissioned in the next quarter. ASC projects running on Cielo as part of the CCC-3 include turbulence, hydrodynamics, burn, asteroids, polycrystals, capability and runtime performance improvements, and materials including carbon and silicone.

  13. First Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-03-15

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. This includes three recently acquired Transportable Array stations located at Cold Creek, Didier Farms, and Phinney Hill. For the Hanford Seismic Network, ten local earthquakes were recorded during the first quarter of fiscal year 2009. All earthquakes were considered as “minor” with magnitudes (Mc) less than 1.0. Two earthquakes were located at shallow depths (less than 4 km), most likely in the Columbia River basalts; five earthquakes at intermediate depths (between 4 and 9 km), most likely in the sub-basalt sediments); and three earthquakes were located at depths greater than 9 km, within the basement. Geographically, four earthquakes occurred in known swarm areas and six earthquakes were classified as random events.

  14. First Quarter Hanford Seismic Report for Fiscal Year 2011

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Clayton, Ray E.; Devary, Joseph L.

    2011-03-31

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 16 local earthquakes during the first quarter of FY 2011. Six earthquakes were located at shallow depths (less than 4 km), seven earthquakes at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments, and three earthquakes were located at depths greater than 9 km, within the basement. Geographically, thirteen earthquakes were located in known swarm areas and three earthquakes were classified as random events. The highest magnitude event (1.8 Mc) was recorded on October 19, 2010 at depth 17.5 km with epicenter located near the Yakima River between the Rattlesnake Mountain and Horse Heaven Hills swarm areas.

  15. Tribopolymerization as an anti-wear mechanism. Quarterly progress report

    SciTech Connect (OSTI)

    Furey, M.J.

    1996-04-01

    The primary objective of this activity is to obtain the necessary data which would enhance, promote, and encourage the introduction of advanced lubrication technology into the marketplace. This includes (a) defining specific but different applications, (b) establishing the limits or ranges of applied loads, speeds, and temperatures over which the concept of tribopolymerization would work in reducing wear and/or friction, (c) continuing in efforts to understand the film-forming process (this rates to (b) above), using this knowledge to develop new and even more effective additives, and (d) exploring possible connections with private and investment companies for the licensing and marketing of products which will reduce friction and wear in a variety of applications. Progress was made in several different but connected areas. These included (a) establishing of load/velocity limits of selected monomers for ceramic lubrication, (b) the discovery of new and effective monomers designed for higher temperature anti-wear applications, (c) improvements and modifications of the high load/high speed pin-on-disk machine, (d) the initiation of related or spin-off projects designed to get their advanced technology into the marketplace, (e) the filing of three new patent applications, and (f) collaborative research with Dr. Kajdas--the co-inventor with Dr. Furey--on tribopolymerization as a novel and effective approach to the boundary lubrication of ceramics and steel. These and other elements of progress made during the first Quarter of 1996 are discussed briefly.

  16. Environmental Hazards Assessment Program quarterly report, January--March 1995

    SciTech Connect (OSTI)

    NONE

    1995-04-30

    The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are to: develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter (January--March) of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan published at the end of the first year of the grant. Questions, comments, or requests for further information concerning the activities under this grant can be forwarded to Jack Davis in the EHAP office of the Medical University of South Carolina at (803) 727-6450.

  17. Subsurface Biogeochemical Research FY11 Second Quarter Performance Measure

    SciTech Connect (OSTI)

    Scheibe, Timothy D.

    2011-03-31

    The Subsurface Biogeochemical Research (SBR) Long Term Measure for 2011 under the Performance Assessment Rating Tool (PART) measure is to "Refine subsurface transport models by developing computational methods to link important processes impacting contaminant transport at smaller scales to the field scale." The second quarter performance measure is to "Provide a report on computational methods linking genome-enabled understanding of microbial metabolism with reactive transport models to describe processes impacting contaminant transport in the subsurface." Microorganisms such as bacteria are by definition small (typically on the order of a micron in size), and their behavior is controlled by their local biogeochemical environment (typically within a single pore or a biofilm on a grain surface, on the order of tens of microns in size). However, their metabolic activity exerts strong influence on the transport and fate of groundwater contaminants of significant concern at DOE sites, in contaminant plumes with spatial extents of meters to kilometers. This report describes progress and key findings from research aimed at integrating models of microbial metabolism based on genomic information (small scale) with models of contaminant fate and transport in aquifers (field scale).

  18. Environmental surveillance data report for the first quarter of 1993

    SciTech Connect (OSTI)

    Gheesling, S.E.; Gideon, J.C.; Gregory, S.M.; Hamilton, L.V.; Horwedel, B.M.; Loffman, R.S.; Salmons, M.C.; Stevens, M.M.

    1993-10-01

    The Environmental Surveillance and Protection Section within the Office of Environmental Compliance and Documentation at the Oak Ridge National Laboratory (ORNL) is responsible for the development and implementation of an envirorunental program to (1) ensure compliance with all federal, state, and Department of Energy (DOE) reporting requirements to quantitatively demonstrate prevention, control, and abatement of environmental pollution; (2) monitor the adequacy of containment and effluent controls; and (3) assess impacts of releases from ORNL facilities on the environment. Environmental monitoring, as defined by the Regulatory Guide, consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is the collection and analysis of samples or measurements of liquid and gaseous effluents. Environmental surveillance is the collection and analysis of samples, or direct measurements of air, water, soil, foodstuff, biota, and other media from DOE sites and their environs. Monthly or quarterly summaries are presented in this report for each medium sampled. All data are rounded to two significant digits. The summary tables generally give the number of samples collected during the period and the maximum, minimum, average, and standard error of the mean (SE) values of parameters for which determinations were made.

  19. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter - September 1982

    SciTech Connect (OSTI)

    1982-09-01

    In the Third Quarter of 1982, the number of signed contracts and committed projects rose from 148 to 173, with a total estimated nominal capacity of these projects of 922 MW. Of this nominal capacity, about 168 MW is operational, and the balance is under contract for development. Of the 173 signed contracts and committed projects, 61 were cogeneration and solid waste projects with a potential of 643 MW. PG and E also had under active discussion 28 cogeneration projects that could generate a total of 968 MW to 1,049 MW, and 10 solid waste projects with a potential of 90 MW to 95 MW. Wind projects under contract number 84, with a generating capability of 85 MW. Also, discussions are being conducted with 17 wind projects, totaling 83 MW. There are 23 hydroelectric projects with signed contracts and a potential of 95 MW, as well as 63 projects under active discussion for 169 MW. In addition, there are 25 hydroelectric projects, with a nominal capacity of 278 MW, that PG and E is constructing or planning to construct. Five contracts have been signed with projects, using other types of electric power generation, capable of producing 100 MW.

  20. QUARTERLY REPORT FORM Report Date: 24 May 2004 U. S. DOE Project Manager's Progress Report Office of Science

    E-Print Network [OSTI]

    Large Hadron Collider Program

    .00 Open Commitments 0 1 Percentage calculation: Remaining Contingency divided by Remaining Costs where of Science Project Number: n/a Title: U.S. LHC Accelerator Construction Project Program: High Energy Physics SUMMARY ASSESSMENT PROJECT MANAGEMENT Current Quarter Previous Quarter Cost: Minor Concern Minor Concern

  1. Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 19, DOE/AL68080-TSR19

    SciTech Connect (OSTI)

    Tim Richter

    2007-06-30

    This nineteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2007, and covers activities in the nineteenth project quarter, April 2007 – June 2007.

  2. The Savannah River Site`s Groundwater Monitoring Program, first quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  3. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  4. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  5. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  6. Quarterly report on the Ferrocyanide Safety Program for the period ending June 30, 1995

    SciTech Connect (OSTI)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1995-07-01

    This is the seventeenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six pans of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented.

  7. Quarterly report on the Ferrocyanide Safety Program for the period ending June 30, 1994

    SciTech Connect (OSTI)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-07-01

    This is the thirteenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated With Hanford site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (Borsheim et al. 1993), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 3.0 and 4.0.

  8. Quarterly report on the Ferrocyanide Safety Program for the period ending December 31, 1995

    SciTech Connect (OSTI)

    Cash, R.J.; Meacham, J.E.

    1996-01-01

    This is the nineteenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 2.0 through 4.0. 58 refs.

  9. Quarterly report on the ferrocyanide safety program for the period ending March 31, 1996

    SciTech Connect (OSTI)

    Meacham, J.E.

    1996-05-08

    This is the twentieth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same fomzat presented there. A summary of the key events occurring this quarter is presented in Section 1. 2. More detailed discussions of progress are located in Sections 2. 0 through 4. 0.

  10. Quarterly report on the Ferrocyanide Safety Program for the period ending September 30, 1994

    SciTech Connect (OSTI)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-10-01

    This is the fourteenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan, and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 3.0 and 4.0.

  11. Quarterly report on the ferrocyanide safety program for the period ending December 31, 1994

    SciTech Connect (OSTI)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1995-01-01

    This is the fifteenth quarterly report on the progress of active addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 2.0 through 4.0. 60 refs.

  12. Quarterly report on the Ferrocyanide Safety Program for the period ending September 30, 1995

    SciTech Connect (OSTI)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1995-10-01

    This is the eighteenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 2.0 through 4.0.

  13. Solar energy systems simulation and analysis. 1st quarterly progress report, September 30-December 30, 1979

    SciTech Connect (OSTI)

    Vant-Hull, L.L.

    1980-01-20

    The primary objective of this contract is to generate User's Guides for several University of Houston developed codes relating to the performance and optimization of solar power tower or solar central receiver systems. Although certain planned generalizations of the codes for a user's version have been delayed until the second quarter, an acceptable outline of the User's Guide has been produced, and documentation is underway. During the second quarter a draft of this user's guide will be prepared, the code generalizations carried to a logical conclusion and preliminary steps in documenting other components of our code library initiated.

  14. Commercial LFCM vitrification technology. Quarterly progress report, October-December 1984

    SciTech Connect (OSTI)

    Burkholder, H.C.; Jarrett, J.H. (comps.)

    1985-07-01

    This report is the first in a series of quarterly reports compiled by the Nuclear Waste Treatment Program Office at Pacific Northwest Laboratory to document progress on commercial liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the first quarter of FY 1985 is discussed: pretreatment systems, melting process chemistry, glass development and characterization, feed preparation and transfer systems, melter systems, canister filling and handling systems, off-gas systems, process/product modeling and control, and supporting studies. 33 figs., 12 tabs.

  15. Tampa Electric Company -- IGCC Project. Quarterly report, July--September 1995

    SciTech Connect (OSTI)

    1995-10-01

    This is the quarterly report for 1995 of the Tampa Electric Company integrated gasification combined-cycle project at Polk Power Station. As of the end of the third quarter of 1995, engineering is essentially complete; construction is about 50% complete. The project is on schedule for the Target Project Completion Date of September 15, 1996. The work force at the site now stands at 1,300 people. Recently the project was recognized for reaching 1 million man-hours without a lost time injury. The report discusses engineering issues, project management issues, construction issues, and accomplishments of each.

  16. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter - March 1983

    SciTech Connect (OSTI)

    1983-03-01

    In the First Quarter of 1983, the number of signed contracts and committed projects rose from 204 to 224, with a total estimated nominal capacity of these projects of 1,246 MW. Of this nominal capacity, about 259 MW is operational, and the balance is under contract for development. Of the 224 signed contracts and committed projects, 70 were cogeneration and solid waste/biomass projects with a potential of 687 MW. PG and E also had under active discussion 30 cogeneration projects that could generate a total of 744 MW to 821 MW, and 12 solid waste/biomass projects with a potential of 118 MW to 126 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 17, with a generating capability of 330 MW. Also, discussions are being conducted with 9 wind farm projects, totaling 184 to 189 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 9 other projects under active discussion. There are 38 hydroelectric projects with signed contracts and a potential of 103 MW, as well as 65 projects under active discussion for 183 MW. In addition, there are 29 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of March 31, 1983.

  17. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, October--December 1995 (first quarter of fiscal year 1996)

    SciTech Connect (OSTI)

    Francfort, J.E.; Bassett, R.R.; Briasco, S.

    1996-03-01

    This is the Site Operator Program quarterly report for USDOE electric and hybrid vehicle research. Its mission now includes the three major activity categories of advancement of electric vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use and increasing public awareness and acceptance of EVs. The 11 Site Operator Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of the site operators totals about 250 vehicles. The individual fleets are summarized.

  18. Molecular accessibility in oxidized and dried coals. Quarterly report

    SciTech Connect (OSTI)

    Kispert, L.D.

    1995-12-01

    The objective of this research project is to determine the molecular and structural changes that occur in swelled coal as a result of oxidation and moisture los both in the presence and absence of light using our newly developed EPR spin probe method. The proposed study will make it possible to deduce the molecular accessibility distribution swelled, {ital oxidized} APCS coal for each rank as a function of (1) size (up to 6 nm) and shape, (2) the relative acidic/basic reactive site distributions, and (3) the role of hydrogen bonding as a function of swelling solvents. The advantage of the EPR method is that it permits molecules of selected shape, size and chemical reactivity to be used as probes of molecular accessible regions of swelled coal. From such data an optimum catalyst can be designed to convert oxidized coal into a more convenient form and methods can be devised to lessen the detrimental weathering process. This quarter we have continued to examine the effect of exposure of light before alkylation versus after O-alkylation of the coal structure. The variation in uptake of spin probe VII (amine group) is depicted in figure 1 for Wyodak-Anderson. Before O-alkylation, a significant decrease occurred in the uptake of VII with increasing exposure to ambient light. This suggests that partial break-up of the hydrogen bond network occurs, making it possible to wash out more of the spin probes. This effect was eliminated if the coal was O-alkylated after exposure to sunlight (Figure 2). The removal of the source of hydrogen bonding is responsible for the lack of spin probe up-take variation with time of exposure to light. Further experiments have shown that the data in Figures 1 and 2 is reproducible with a deviation of less than {+-} 10%. It has also been observed that if Wyodak-Anderson coal is exposed to sunlight before swelling, the oscillatory up-take of spin probe VII as a function of percent pyridine is essentially removed.

  19. NEAMS update quarterly report for January - March 2012.

    SciTech Connect (OSTI)

    Bradley, K.S.; Hayes, S.; Pointer, D.; Summers, R.; Sadasivan, P.; Sun, X.; Bernholdt, D.; Miller, M.; Stewart, J.

    2012-05-10

    Quarterly highlights are: (1) The integration of Denovo and AMP was demonstrated in an AMP simulation of the thermo-mechanics of a complete fuel assembly; (2) Bison was enhanced with a mechanistic fuel cracking model; (3) Mechanistic algorithms were incorporated into various lower-length-scale models to represent fission gases and dislocations in UO2 fuels; (4) Marmot was improved to allow faster testing of mesoscale models using larger problem domains; (5) Component models of reactor piping were developed for use in Relap-7; (6) The mesh generator of Proteus was updated to accept a mesh specification from Moose and equations were formulated for the intermediate-fidelity Proteus-2D1D module; (7) A new pressure solver was implemented in Nek5000 and demonstrated to work 2.5 times faster than the previous solver; (8) Work continued on volume-holdup models for two fuel reprocessing operations: voloxidation and dissolution; (9) Progress was made on a pyroprocessing model and the characterization of pyroprocessing emission signatures; (10) A new 1D groundwater waste transport code was delivered to the used fuel disposition (UFD) campaign; (11) Efforts on waste form modeling included empirical simulation of sodium-borosilicate glass compositions; (12) The Waste team developed three prototypes for modeling hydride reorientation in fuel cladding during very long-term fuel storage; (13) A benchmark demonstration problem (fission gas bubble growth) was modeled to evaluate the capabilities of different meso-scale numerical methods; (14) Work continued on a hierarchical up-scaling framework to model structural materials by directly coupling dislocation dynamics and crystal plasticity; (15) New 'importance sampling' methods were developed and demonstrated to reduce the computational cost of rare-event inference; (16) The survey and evaluation of existing data and knowledge bases was updated for NE-KAMS; (17) The NEAMS Early User Program was launched; (18) The Nuclear Regulatory Commission (NRC) Office of Regulatory Research was introduced to the NEAMS program; (19) The NEAMS overall software quality assurance plan (SQAP) was revised to version 1.5; and (20) Work continued on NiCE and its plug-ins and other utilities, such as Cubit and VisIt.

  20. LLE Review Quarterly Report January - March 2012. Volume 130

    SciTech Connect (OSTI)

    Shvydky, Alex

    2012-03-01

    This volume of the LLE Review, covering January–March 2012, features “OMEGA Polar-Drive Target Designs,” by P. B. Radha, J. A. Marozas, F. J. Marshall, A. Shvydky, T. J. B. Collins, V. N. Goncharov, R. L. McCrory, P. W. McKenty, D. D. Meyerhofer, T. C. Sangster, and S. Skupsky. This article (p. 57) describes low-adiabat, cryogenic-deuterium–tritium, and warm-plastic-shell polar-drive (PD)–implosion designs for the OMEGA laser. The designs are at two different on-target laser intensities, each at a different in-flight aspect ratio (IFAR). The first design permits one to study implosion energetics and target performance closer to ignition-relevant intensities (7 X 1014 W/cm2 at the quarter-critical surface), where nonlocal heat conduction and laser–plasma interactions can play an important role, but at lower values of IFAR (~22). The second design permits one to study implosion energetics and target performance at a lower intensity (3 X 1014 W/cm2) but at higher IFAR (~32), where the shell instability can play an important role. The higher IFAR designs are accessible on the existing OMEGA Laser System only at lower intensities. Implosions at ignition-relevant intensities can be obtained only by reducing target radius, although only at smaller values of IFAR. Polar-drive geometry requires repointing the laser beams to improve shell symmetry. The higher-intensity designs optimize target performance by repointing beams to a lesser extent and compensate for the reduced equatorial drive by increasing beam energies for the repointed beams and using custom beam profiles that improve equatorial illumination at the expense of irradiation at higher latitudes. These designs will be studied when new phase plates for the OMEGA Laser System, corresponding to the smaller target radii and custom beam profiles, are obtained. Implosion results from the combined set of high-intensity and high-IFAR implosions should yield valuable data to validate models of laser-energy deposition, heat conduction, nonuniformity growth, and fuel assembly in PD geometry.

  1. The Quarterly Publication of NCEER Volume 9, Number 3, July 1995 Crude Oil Transmission Study

    E-Print Network [OSTI]

    Nagarajaiah, Satish

    The Quarterly Publication of NCEER Volume 9, Number 3, July 1995 Crude Oil Transmission Study. The production and delivery of crude oil is critical to every major in- dustry and business sector in the United States. This nation's most crucial crude oil system traverses the midwest and is subject to seismic

  2. Coal gasification. Quarterly report, January-March 1979. [US DOE supported

    SciTech Connect (OSTI)

    None

    1980-01-01

    Progress in DOE-supported coal gasification pilot plant projects is reported: company, location, contract number, funding, process description, history and progress in the current quarter. Two support projects are discussed: preparation of a technical data book and mathematical modeling of gasification reactors. (LTN)

  3. innovations volume 4 | issue 4 | fall 2009 A quarterly journal published by MIT Press

    E-Print Network [OSTI]

    Kammen, Daniel M.

    innovations volume 4 | issue 4 | fall 2009 A quarterly journal published by MIT Press Energy by the MIT Press, 238 Main Street, Suite 500, Cambridge, MA 02142-1046. Subscription Information. An electronic, full-text version of Innovations is available from the MIT Press. Subscription rates

  4. EDIN-USVI Clean Energy Quarterly: Volume 2, Issue 1, June 2012 (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01

    This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations-U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the working groups, and project-related technology deployment efforts.

  5. Preprint Article accepted to appear in The Library Quarterly Digital Library Archeology: A Conceptual

    E-Print Network [OSTI]

    Nicholson, Scott

    to a single type of virtual place ­ a digital library. The Digital Library Federation defines digital1 Preprint ­ Article accepted to appear in The Library Quarterly Digital Library Archeology: A Conceptual Framework for Understanding Library Use through Artifact-Based Evaluation Scott Nicholson

  6. Optimization of the Double Quarter Wave Crab Cavity Prototype for Testing at SPS

    E-Print Network [OSTI]

    Verdú-Andrés, Silvia; Wu, Qiong; Xiao, Binping; Belomestnykh, Sergey; Calaga, Rama; Zenghai, Li

    2013-01-01

    The crab cavity program for LHC luminosity upgrade envisages the testing of at least one of the three competing crab cavities in the Super Proton Synchrotron (SPS) of CERN by 2016. This paper presents the design optimization of a Double Quarter Wave Crab Cavity (DQWCC) prototype suited for testing in SPS.

  7. Cryogenic Test of Double Quarter Wave Crab Cavity for the LHC High Luminosity Upgrade

    E-Print Network [OSTI]

    Xiao, B; Belomestnykh, S; Ben-Zvi, I; Calaga, Rama; Cullen, C; Capatina, Ofelia; Hammons, L; Li, Z; Marques, C; Skaritka, J; Verdú-Andres, S; Wu, Q

    2015-01-01

    A Proof-of-Principle (PoP) Double Quarter Wave Crab Cavity (DQWCC) was designed and fabricated for the Large Hadron Collider (LHC) luminosity upgrade. A vertical cryogenic test has been done at Brookhaven National Lab (BNL). The cavity achieved 4.5 MV deflecting voltage with a quality factor above 3×109 . We report the test results of this design.

  8. The Savannah River Site`s Groundwater Monitoring Program. First quarter 1992

    SciTech Connect (OSTI)

    Not Available

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  9. Sanitary Landfill Groundwater Monitoring Report - Fourth Quarter 1998 and 1998 Summary

    SciTech Connect (OSTI)

    Chase, J.

    1999-04-09

    A maximum of fifty-three wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled quarterly to comply with the South Carolina Department of Health and Environmental Control Domestic Water permit and as part of the SRS Groundwater Monitoring Program.

  10. Multipacting-free quarter-wavelength choke joint design for BNL SRF

    SciTech Connect (OSTI)

    Xu, W.; Belomestnykh, S.; Ben-Zvi, I.; Liaw, C. J.; Smith, K.; Than, R.; Tuozzolo, J.; Wang, E.; Weiss, D.; Zaltsman, A.

    2015-05-03

    The BNL SRF gun cavity operated well in CW mode up to 2 MV. However, its performance suffered due to multipacting in the quarter-wavelength choke joint. A new multipacting-free cathode stalk was designed and conditioned. This paper describes RF and thermal design of the new cathode stalk and its conditioning results.

  11. NRC Regulatory Agenda quarterly report, July--September 1993. Volume 12, No. 3

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  12. ABOUT THE JOURNAL Renaissance Quarterly is the leading American journal of

    E-Print Network [OSTI]

    Mateo, Jill M.

    ABOUT THE JOURNAL Renaissance Quarterly is the leading American journal of Renaissance studies from 1300 to 1650 in Western history. The official journal of the Renaissance Society of America, the journal publishes international scholarship from diverse disciplines such as: Comparative literature

  13. EEC 289-L Photovoltaics and Solar Cells 3 Units Winter Quarter (Alternate Years)

    E-Print Network [OSTI]

    California at Davis, University of

    EEC 289-L Photovoltaics and Solar Cells 3 Units ­ Winter Quarter (Alternate Years) Prerequisite, and third-generation photovoltaics and solar cells, including design, fabrication technology, and grid physics of photovoltaics a. Device operation and performance metrics b. Properties of solar radiation c

  14. NEAMSUpdateQuarterly report for January March 2013 Published May 2013 Nuclear Energy

    E-Print Network [OSTI]

    Kemner, Ken

    of an SFR fuel assembly (page 3). }} Transient multiphysics neutronics, thermal fluids, and reactor kineticsNEAMSUpdateQuarterly report for January ­ March 2013 Published May 2013 Nuclear Energy ANL/NEAMS-13 }} Modeling of fuel pellet and cladding interactions was improved by adding frictional slip and release

  15. The Savannah River Site`s Groundwater Monitoring Program, First Quarter 1996, Volumes I and II

    SciTech Connect (OSTI)

    Rogers, C.D.

    1996-10-22

    This report summarizes the Savanna River Site (SRS) Groundwater Monitoring Program conducted by EPD/EMS during the first quarter 1996. It includes the analytical data, field data, data review, quality control, and other documentation for this program. It also provides a record of the program`s activities and serves as an official record of the analytical results.

  16. The Savannah River Site's Groundwater Monitoring Program second quarter 1999 (April through June 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    1999-12-16

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  17. The Savannah River Site`s groundwater monitoring program. First quarter 1991

    SciTech Connect (OSTI)

    Not Available

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

  18. A quarterly publication of the Louisiana Tech Rural Development Center Volume 5, No. 1, Fall 2010

    E-Print Network [OSTI]

    Selmic, Sandra

    between Louisiana Tech and communities, the Center has a new website, on which you can find informationRural Louisiana A quarterly publication of the Louisiana Tech Rural Development Center Volume 5, No. 1, Fall 2010 Editor: Aaron K. Lusby Director, Asst. Professor Louisiana Tech Rural Development

  19. HIGH INTENSITY LINAC DRIVER FOR THE SPIRAL-2 PROJECT : DESIGN OF SUPERCONDUCTING 88 MHZ QUARTER WAVE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . For the high-energy section of the linac, a superconducting 88 MHz Quarter Wave Resonator (beta 0.12) has been WAVE RESONATORS (BETA 0.12), POWER COUPLERS AND CRYOMODULES T. Junquera, G. Olry, H. Saugnac, J Abstract A superconducting linac driver, delivering deuterons with an energy up to 40 MeV (5 mA) and heavy

  20. Quarterly Notification of the Department of Energy's Differing Professional Opinion Process

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-01-30

    DOE O 442.2 requires that all DOE employees (including contractors and subcontractors) be notified quarterly of the Differing Professional Opinion (DPO) process to ensure that they are made aware of the process, including the DPO Web page address and the contact information for submitting DPOs.

  1. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    SciTech Connect (OSTI)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  2. EDIN-USVI Clean Energy Quarterly: Volume 1, Issue 3, September 2011 (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations-U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and project-related renewable energy and energy efficiency educational outreach and technology deployment efforts.

  3. Characterization of Ultra-thin Quarter-wavelength Matching Layers of High Frequency Ultrasonic Transducers

    E-Print Network [OSTI]

    Cao, Wenwu

    Characterization of Ultra-thin Quarter-wavelength Matching Layers of High Frequency Ultrasonic impedance mismatch between the piezoelectric material and the human body. .At high frequencies (>5OMHz frequency dependent acoustic properties, especially at high frequencies. Therefore, time domain based

  4. A New Course for Fall 1999 Quarter (Physics 409) Synchrotron Radiation and

    E-Print Network [OSTI]

    A New Course for Fall 1999 Quarter (Physics 409) Synchrotron Radiation and Free Electron Lasers Instructor: Kwang-Je Kim (kwangje@aps.anl.gov) Synchrotron radiation is the electromagnetic radiation emitted for basic and applied studies of physical and biological systems. A number of major research institutions

  5. The Savannah River Site's Groundwater Monitoring Program - Second Quarter 1998 (April through June 1998)

    SciTech Connect (OSTI)

    Hutchison, J B

    1999-02-10

    This report summarizes the Groundwater Monitoring Program conducted by SRS during second quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for the program; provides a record of the program's activities; and serves as an official record of the analytical results.

  6. The Savannah River Site's Groundwater Monitoring Program Second Quarter 2000 (April through June 2000)

    SciTech Connect (OSTI)

    Dukes, M.D.

    2001-04-17

    This report summarizes the Groundwater Monitoring Program conducted by SRS during second quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  7. The Savannah River Site's Groundwater Monitoring Program First Quarter 1999 (January through March 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    1999-12-08

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  8. The Savannah River Site's Groundwater Monitoring Program First Quarter 1998 (January through March 1998)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    1999-05-26

    This report summarizes the Groundwater Monitoring Program conducted by the Savannah River Site during first quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  9. The Savannah River Site's Groundwater Monitoring Program First Quarter 2000 (January through March 2000)

    SciTech Connect (OSTI)

    Dukes, M.

    2000-11-16

    This report summarizes the Groundwater Monitoring Program conducted by SRS during first quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  10. The Savannah River Site's Groundwater Monitoring Program - Third Quarter 1999 (July through September 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    2000-09-05

    This report summarizes the Savannah River Site Groundwater Monitoring Program during the third quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program activities; and serves as an official record of the analytical results.

  11. The Savannah River Site's Groundwater Monitoring Program Third Quarter 2000 (July through September 2000)

    SciTech Connect (OSTI)

    Dukes, M.D.

    2001-05-02

    This report summarizes the Groundwater Monitoring Program conducted by SRS during third quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  12. The Savannah River Site's Groundwater Monitoring Program - Fourth Quarter 1999 (October through December 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    2000-10-12

    This report summarizes the Groundwater Monitoring Program conducted by the Savannah River site during fourth quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official records of the analytical results.

  13. National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Summer 2011 (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    Summer 2011 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: evaluating new analytical techniques for measuring soluble sugars in the liquid portion of biomass hydrolysates, and measurement of the fraction of insoluble solids in biomass slurries.

  14. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    SciTech Connect (OSTI)

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  15. &Philippine Quarterly ofCulture Society 11 (1983): 237-256

    E-Print Network [OSTI]

    Belsky, Jill M.

    1983-01-01

    &Philippine Quarterly ofCulture Society 11 (1983): 237-256 HOUSEHOLD RESPONSES TO DROUGHT IN TWO SUBSISTENCE LEYTE VILLAGES ////M. Belsky and Stephen F. Siebert1 INTRODUCTION The a severePhilippines; and the Philippine-American Educational Foundation for funding the research. 2The two names used in this article

  16. Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006

    SciTech Connect (OSTI)

    Hartman, Mary J.

    2006-11-01

    This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

  17. The AMTEX Partnership{sup trademark}. Second quarter report. Fiscal year 1996

    SciTech Connect (OSTI)

    Lemon, D.K.; Quisenberry, R.K.

    1996-03-01

    This quarterly report details activities of the AMTEX Partnership {sup TM} which is a collaborative research and development program among the U.S. Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating U.S. jobs.

  18. Inertial Confinement Fusion quarterly report, April--June 1995. Volume 5, No. 3

    SciTech Connect (OSTI)

    NONE

    1995-12-31

    The ICF Quarterly Reports is published four times each fiscal year by the Inertial Confinement Fusion Program at the Lawrence Livermore National Laboratory. The journal reports selected current research within the ICF Program. Major areas of investigation presented here include fusion target theory and design, target fabrication, target experiments, and laser and optical science and technology.

  19. IEEE Communications Surveys & Tutorials 1st Quarter 200638 ith the rapid growth of wireless access technolo-

    E-Print Network [OSTI]

    Fu, Xiaoming

    IEEE Communications Surveys & Tutorials · 1st Quarter 200638 ith the rapid growth of wireless mobility, and that there should be more collaboration between layers to avoid conflict and inefficiency. These exiting works did discuss some of existing and emerging mobility approaches and proposed some interesting

  20. Formal Speci cation of a Prolog Compiler Michael Hanus

    E-Print Network [OSTI]

    Hanus, Michael

    , T erms, T erm, String operations: prog: Clauses ! P rog csequ: Clause, Clauses ! Clauses empty csequ: ! Clauses clause: T erm, T erm ! Clause tsequ: T erm, T erms ! T erms empty tsequ: ! T erms var: String ! T erm structure: Strin

  1. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2009-01-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The first quarter comprises a total of 2,208 hours. The average exceeded their goal this quarter.

  2. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2011-02-01

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2010, for the fixed sites. Because the AMFs operate episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This first quarter comprises a total of 2,208 possible hours for the fixed sites and the AMF1 and 1,464 possible hours for the AMF2. The average of the fixed sites exceeded our goal this quarter. The AMF1 has essentially completed its mission and is shutting down to pack up for its next deployment to India. Although all the raw data from the operational instruments are in the Archive for the AMF2, only the processed data are tabulated. Approximately half of the AMF2 instruments have data that was fully processed, resulting in the 46% of all possible data made available to users through the Archive for this first quarter. Typically, raw data is not made available to users unless specifically requested.

  3. Second Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-07-31

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded over 800 local earthquakes during the second quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 19 events in the 2.0-2.9 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 1.9 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude and the shallowness of the Wooded Island events have made them undetectable to most area residents. However, some Hanford employees working within a few miles of the area of highest activity, and individuals living in homes directly across the Columbia River from the swarm center, have reported feeling some movement. The Hanford SMA network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration values recorded by the SMA network were approximately 2-3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressures that have built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, PNNL will continue to monitor the activity continuously. Outside of the Wooded Island swarm, four earthquakes were recorded. Three earthquakes were classified as minor and one event registered 2.3 Mc. One earthquake was located at intermediate depth (between 4 and 9 km, most likely in the pre-basalt sediments) and three earthquakes at depths greater than 9 km, within the basement. Geographically, two earthquakes were located in known swarm areas and two earthquakes were classified as random events.

  4. NEAMS Update. Quarterly Report for October - December 2011.

    SciTech Connect (OSTI)

    Bradley, K.

    2012-02-16

    The Advanced Modeling and Simulation Office within the DOE Office of Nuclear Energy (NE) has been charged with revolutionizing the design tools used to build nuclear power plants during the next 10 years. To accomplish this, the DOE has brought together the national laboratories, U.S. universities, and the nuclear energy industry to establish the Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program. The mission of NEAMS is to modernize computer modeling of nuclear energy systems and improve the fidelity and validity of modeling results using contemporary software environments and high-performance computers. NEAMS will create a set of engineering-level codes aimed at designing and analyzing the performance and safety of nuclear power plants and reactor fuels. The truly predictive nature of these codes will be achieved by modeling the governing phenomena at the spatial and temporal scales that dominate the behavior. These codes will be executed within a simulation environment that orchestrates code integration with respect to spatial meshing, computational resources, and execution to give the user a common 'look and feel' for setting up problems and displaying results. NEAMS is building upon a suite of existing simulation tools, including those developed by the federal Scientific Discovery through Advanced Computing and Advanced Simulation and Computing programs. NEAMS also draws upon existing simulation tools for materials and nuclear systems, although many of these are limited in terms of scale, applicability, and portability (their ability to be integrated into contemporary software and hardware architectures). NEAMS investments have directly and indirectly supported additional NE research and development programs, including those devoted to waste repositories, safeguarded separations systems, and long-term storage of used nuclear fuel. NEAMS is organized into two broad efforts, each comprising four elements. The quarterly highlights October-December 2011 are: (1) Version 1.0 of AMP, the fuel assembly performance code, was tested on the JAGUAR supercomputer and released on November 1, 2011, a detailed discussion of this new simulation tool is given; (2) A coolant sub-channel model and a preliminary UO{sub 2} smeared-cracking model were implemented in BISON, the single-pin fuel code, more information on how these models were developed and benchmarked is given; (3) The Object Kinetic Monte Carlo model was implemented to account for nucleation events in meso-scale simulations and a discussion of the significance of this advance is given; (4) The SHARP neutronics module, PROTEUS, was expanded to be applicable to all types of reactors, and a discussion of the importance of PROTEUS is given; (5) A plan has been finalized for integrating the high-fidelity, three-dimensional reactor code SHARP with both the systems-level code RELAP7 and the fuel assembly code AMP. This is a new initiative; (6) Work began to evaluate the applicability of AMP to the problem of dry storage of used fuel and to define a relevant problem to test the applicability; (7) A code to obtain phonon spectra from the force-constant matrix for a crystalline lattice has been completed. This important bridge between subcontinuum and continuum phenomena is discussed; (8) Benchmarking was begun on the meso-scale, finite-element fuels code MARMOT to validate its new variable splitting algorithm; (9) A very computationally demanding simulation of diffusion-driven nucleation of new microstructural features has been completed. An explanation of the difficulty of this simulation is given; (10) Experiments were conducted with deformed steel to validate a crystal plasticity finite-element code for bodycentered cubic iron; (11) The Capability Transfer Roadmap was completed and published as an internal laboratory technical report; (12) The AMP fuel assembly code input generator was integrated into the NEAMS Integrated Computational Environment (NiCE). More details on the planned NEAMS computing environment is given; and (13) The NEAMS program website (neams.ener

  5. Enterprise Risk Management (ERM) Model - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES October 27th, 2010 ThanksProgramEnrico Fermi andof

  6. [National Institute for Petroleum and Energy Research] quarterly technical report, October 1--December 31, 1992. Volume 2, Energy production research

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    Accomplishments for the past quarter are described for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology.

  7. ARRA Material Handling Equipment Composite Data Products: Data through Quarter 3 of 2014; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Ainscough, Chris; Kurtz, Jennifer

    2015-05-01

    This document includes 23 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the third quarter of 2014.

  8. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  9. Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  10. Oak Ridge Reservation Federal Facility Agreement: Quarterly report for the Environmental Restoration Program. Volume 2, January--March 1996

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    This report provides information about ER Program activities conducted on the Oak Ridge Reservation under the Federal Facility Agreement (FFA). Specifically, it includes information on milestones scheduled for completion during the reporting period as well as scheduled for completion during the next reporting period (quarter), accomplishments of the ER Program, concerns related to program work, and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  11. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    SciTech Connect (OSTI)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  12. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1988

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Group of the Health Protection Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1988 (October--December), routine sampling of monitoring wells and drinking water locations was performed. The drinking water samples were collected from Savannah River Site (SRS) drinking water systems supplied by wells. Two sets of flagging criteria were established in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. The drinking water samples were analyzed for radioactive constituents.

  13. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    SciTech Connect (OSTI)

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  14. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    SciTech Connect (OSTI)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Among these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.

  15. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  16. The Savannah River Site`s Groundwater Monitoring Program: Fourth quarter 1991

    SciTech Connect (OSTI)

    Rogers, C.D.

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  17. Atmospheric Radiation Measurement program climate research facility operations quarterly report April 1 - June 30, 2007.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2007-07-26

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2007 for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.6 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.4 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period April 1 through June 30, 2007, for the fixed sites only. The AMF has been deployed to Germany and is operational this quarter. The third quarter comprises a total of 2,184 hours. Although the average exceeded our goal this quarter, there were cash flow issues resulting from Continuing Resolution early in the period that did not allow for timely instrument repairs that kept our statistics lower than past quarters at all sites. The low NSA numbers resulted from missing MFRSR data this spring that appears to be recoverable but not available at the Archive at the time of this report.

  18. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    SciTech Connect (OSTI)

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  19. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-04-04

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’ Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.

  20. The Savannah River Site`s Groundwater Monitoring Program. Second quarter, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  1. Northeast regional biomass program. First quarter report, October--December 1993

    SciTech Connect (OSTI)

    NONE

    1994-05-01

    This progress report presents summaries of various projects which were in operation or being planned during this quarter period. Projects included testing the efficiency of using wood chips as fuel in heating systems, barriers to commercial development of wood pellet fuels, studies of more efficient and less polluting wood stoves, work on landfill gas utilization, directories of facilities using biomass fuels, surveys of biomass conversion processes to liquid fuels, for commercial development, etc.

  2. Chaotic Vibration of a Quarter-Car Model Excited by the Road Surface Profile

    E-Print Network [OSTI]

    Grzegorz Litak; Marek Borowiec; Michael I. Friswell; Kazimierz Szabelski

    2006-01-14

    The Melnikov criterion is used to examine a global homoclinic bifurcation and transition to chaos in the case of a quarter car model excited kinematically by the road surface profile. By analyzing the potential an analytic expression is found for the homoclinic orbit. By introducing an harmonic excitation term and damping as perturbations, the critical Melnikov amplitude of the road surface profile is found, above which the system can vibrate chaotically.

  3. Design and Prototyping of HL-LHC Double Quarter Wave Crab Cavities for SPS Test

    E-Print Network [OSTI]

    Verdú-Andrés, S; Wu, Q; Xiao, B P; Belomestnykh, S; Alberty, L; Artoos, Kurt; Calaga, Rama; Capatina, Ofelia; Capelli, Teddy; Carra, Federico; Leuxe, Raphael; Kuder, Norbert; Zanoni, Carlo; Li, Z; Ratti, A

    2015-01-01

    The LHC high luminosity project envisages the use of the crabbing technique for increasing and levelling the LHC luminosity. Double Quarter Wave (DQW) resonators are compact cavities especially designed to meet the technical and performance requirements for LHC beam crabbing. Two DQW crab cavities are under fabrication and will be tested with beam in the Super Proton Synchrotron (SPS) at CERN by 2017. This paper describes the design and prototyping of the DQW crab cavities for the SPS test.

  4. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1992

    SciTech Connect (OSTI)

    Not Available

    1993-05-17

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the fourth quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities; and serves as an official document of the analytical results.

  5. FY 2010 Fourth Quarter Report: Evaluation of the Dependency of Drizzle Formation on Aerosol Properties

    SciTech Connect (OSTI)

    Lin, W; McGraw, R; Liu, Y; Wang, J; Vogelmann, A; Daum, PH

    2010-10-01

    Metric for Quarter 4: Report results of implementation of composite parameterization in single-column model (SCM) to explore the dependency of drizzle formation on aerosol properties. To better represent VOCALS conditions during a test flight, the Liu-Duam-McGraw (LDM) drizzle parameterization is implemented in the high-resolution Weather Research and Forecasting (WRF) model, as well as in the single-column Community Atmosphere Model (CAM), to explore this dependency.

  6. Quarterly report April 1 - June 30, 1997 [ARPA TRP turboalternator development

    SciTech Connect (OSTI)

    NONE

    1998-05-12

    This is a quarterly report of CALSTART's progress with their programs. Their overall objectives remain: (1) efficiently and responsible management of the program and; (2) assist in the commercialization of the technology by doing the following: identifying potential strategic partners; explaining need and value of turbogenerator; reach important audiences for AlliedSignal; showcase technology at key conferences/briefings; raise technology profile via custom Web information; and extend AlliedSignal turbogenerator outreach efforts.

  7. Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4

    SciTech Connect (OSTI)

    NONE

    1994-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  8. Idaho National Engineering and Environmental Laboratory Radiological Control Performance Indicator Report -- Fourth Quarter, Calendar Year 1998

    SciTech Connect (OSTI)

    Hinckley, F.L.

    1999-02-01

    This document provides a report of an analysis of the Radiological Control Program through the fourth quarter of Calendar Year (CY-98) and is the annual report for the Idaho National Engineering and Environmental Laboratory (INEEL). This Performance Indicator Report is provided in accordance with Article 133 of the INEEL Radiological Control Manual. The INEEL collective occupational radiation deep dose is 63.034 person-rem year to date, compared to a goal of 83.1 person-rem. During the fourth quarter, all areas experienced deletions of work resulting from the Maintenance Stand Down. This reduction in work is a primary factor in the difference in the year end dose and the ALARA goal. The work will be completed during CY-99. Beginning in CY-98, a numeric Radiological Performance Index (RPI) is being used to compare radiological performance. The RPI takes into consideration frequency and severity of events such as skin contaminations, clothing contaminations, spills, exposures to radiation exceeding limits, and positive internal dose. The RPI measures the cost of these events in cents per hour of radiological work performed. To make the RPI meaningful, tables have been prepared to show the facility that contributes to the values used. The data are compared on a quarterly basis to the prior year to show measurable performance.

  9. Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1980

    SciTech Connect (OSTI)

    Entingh, Daniel J.

    1980-03-01

    The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government and an agency of the State of Maryland, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/DGE), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, supported by the Reactor Safety Research Division of the Nuclear Regulatory Commission, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the U.S. Naval Air Station, Norfolk, Va. This work is supported by the Department of Energy and the Department of Defense, Naval Facilities Engineering Command/Atlantic Division.

  10. Sanitary Landfill Groundwater Monitoring Report, Fourth Quarter 1999 and 1999 Summary

    SciTech Connect (OSTI)

    Chase, J.

    2000-03-13

    A maximum of thirty eight-wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill Area at the Savannah River Site (SRS). These wells are sampled quarterly to comply with the South Carolina Department of Health and Environmental Control Domestic Water Permit DWP-087A and as part of the SRS Groundwater Monitoring Program. Iron (Total Recoverable), Chloroethene (Vinyl Chloride) and 1,1-Dichloroethane were the most widespread constituents exceeding the Final Primary Drinking Water Standards during 1999. Trichloroethylene, 1,1-Dichloroethylene, 1,2-Dichloroethane, 1,4-Dichlorobenzene, Aluminum (Total Recoverable), Benzene, cis-1,2-Dichloroethylene, Dichlorodifluoromethane, Dichloromethane (Methylene Chloride), Gross Alpha, Mercury (Total Recoverable), Nonvolatile Beta, Tetrachloroethylene, Total Organic Halogens, Trichlorofluoromethane, Tritium also exceeded standards in one or more wells. The groundwater flow direction in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill is to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 144.175 ft/year during first quarter 1999 and 145.27 ft/year during fourth quarter 1999.

  11. F-Area seepage basins, groundwater quality assessment report, first quarter 1990

    SciTech Connect (OSTI)

    Not Available

    1990-06-01

    During the first quarter of 1990, wells which make up the F-Area Seepage Basins (F-HWMF) monitoring network were sampled. Laboratory analyses were performed to measure levels of hazardous constituents, indicator parameters, tritium, gross alpha, and nonvolatile beta. The primary contaminants observed at wells monitoring the F-Area Seepage Basins are tritium, nitrate, cadmium, lead, total radium, gross alpha, and nonvolatile beta. Concentrations of at least one of the following constituents: tritium, nitrate, total radium, gross alpha, cadmium, lead, tetrachloroethylene, nonvolatile beta, endrin, lindane, barium, fluoride, mercury, and trichlorethylene in excess of the primary drinking water standard (PDWS) were observed in at least one well monitoring the F-Area Seepage Basins. Tritium concentrations above the PDWS occur in forty-four of the fifty-nine (75%) groundwater monitoring wells. Nitrate concentrations above the PDWS occur in thirty-four of the fifty-nine (59%) groundwater wells. The radionuclides, total radium, gross alpha, and nonvolatile beta, exceed the PDWS is over twenty-five percent of the groundwater wells. Heavy metals, cadmium and lead in particular, exceed the PDWS in over twelve percent of the wells. Since 1987, tritium and nitrate concentrations have been steadily declining in a majority of the wells. However, tritium concentrations, from fourth quarter 1989 to first quarter 1990, have increased.

  12. RESULTS FOR THE THIRD QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Reigel, M.

    2011-10-20

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Third Quarter samples collected from Tank 50 on July 7, 2011 and discusses those results in further detail than the previously issued results report.

  13. RESULTS FOR THE FOURTH QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Bannochie, C.

    2012-01-31

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

  14. Quarterly report on ferrocyanide safety program for the period ending December 31, 1993

    SciTech Connect (OSTI)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-02-01

    This is the eleventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating to high temperatures [above 285{degree}C (545{degree}F)]. In the mid 1950s, approximately 140 metric tons of ferrocyanide were added to waste now stored in underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities that were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan (Borsheim et al. 1992) was transmitted to the US Department of Energy by Westinghouse Hanford Company in December 1992, and subsequently to the Defense Nuclear Facilities Safety Board in 1993. The implementation plan was updated and revised this quarter and re-released as the ferrocyanide safety program plan (Borsheim et al, 1993a). The program plan still addresses the six parts of Recommendation 90-7; however, it also includes all work in the Ferrocyanide Safety Program. This quarterly report is reported against the new program plan.

  15. High SO{sub 2} removal efficiency testing. Quarterly status report, April-June 1995

    SciTech Connect (OSTI)

    Blythe, G.

    1995-07-14

    This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarters that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the third quarter of calendar year 1995. Section 5 contains a brief acknowledgment.

  16. Biomass power for rural development. Quarterly report, October 3, 1998--January 1, 1999

    SciTech Connect (OSTI)

    Cooper, J.T.

    1999-02-01

    Information and education activities for this quarter include both the monthly progress activities with some copies of materials developed and a copy of the annual report prepared for the Leopold Center for Sustainable Agriculture. The Leopold Center is a project partner and the primary sponsor of the information and education activities. The Leopold annual report references many prepared documents and assorted presentation materials. The Energy and Geological Resources Division of the Iowa Department of Natural Resources sponsors a meeting four times a year in order to bring members of the Iowa biomass energy community together to share information. In this quarter the Stakeholders meeting was held on October 21, 1998, in Des Moines Iowa. The first phase of the Geographic Information System (GIS) efforts have been completed and a final report with a map presentation of materials will be included in the next Quarterly Report. A meeting with Ed Gray of The Antares Group and project staff/cooperators was held October 23, 1998. The authors discussed the Niagara Project and the efforts to value the biomass material and partner contributions. Niagara has identified a value to the grid support capabilities of the dispersed generation.

  17. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    SciTech Connect (OSTI)

    1993-03-31

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year.

  18. Proposal for a Blanket Purchase Agreement for the Supply of Foundry Services in Quarter-Micron CMOS Technology for the LHC experiments

    E-Print Network [OSTI]

    1999-01-01

    Proposal for a Blanket Purchase Agreement for the Supply of Foundry Services in Quarter-Micron CMOS Technology for the LHC experiments

  19. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 – September 30, 2008

    SciTech Connect (OSTI)

    DL Sisterson

    2008-09-30

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2008 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 ? 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter.

  20. Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2009-07-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for April 1 - June 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and are not included in the aggregate average with the fixed sites. The AMF statistics for this reporting period were not available at the time of this report. The third quarter comprises a total of 2,184 hours for the fixed sites. The average well exceeded our goal this quarter.

  1. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2009-10-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.

  2. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2009-04-23

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2009, for the fixed sites. The AMF has completed its mission in China but not all of the data can be released to the public at the time of this report. The second quarter comprises a total of 2,160 hours. The average exceeded our goal this quarter.

  3. H-Area, K-Area, and Par Pond Sewage Sludge Application Sites groundwater monitoring report. Third quarter 1994

    SciTech Connect (OSTI)

    1995-01-01

    Groundwater samples from the three wells at the H-Area Sewage Sludge Application Site (HSS wells) are analyzed quarterly for constituents as required by South Carolina Department of Health and Environmental Control (SCDHEC) Construction Permit 12,076. Samples from the three wells at the K-Area Sewage Sludge Application Site (KSS wells) and the three wells at the quired by SCDHEC Construction Permit 13,173. All samples are also analyzed as requested for other constituents as part of the Savannah River Site (SRS) Groundwater Monitoring Program. Annual analyses for other constituents, primarily metals, also are required by the permits. No constituents exceeded the SCDHEC final Primary Drinking Water Standard in any well from the H-Area, K-Area, and Par Pond Sewage Sludge Application Sites. Aluminum and iron were above Flag 2 criteria in one or more wells in the three sites during third quarter 1994. These constituents were not analyzed during the previous quarter. Third quarter results are similar to results for first quarter 1994.

  4. Money where it comes from and how we use it MA.02.01.06.07: Identifies pennies, nickels, dimes, and quarters, and their values.

    E-Print Network [OSTI]

    Money ­ where it comes from and how we use it MA.02.01.06.07: Identifies pennies, nickels, dimes, and quarters, and their values. MA.02.01.07.01: Compares two sets of objects, including pennies, up to at least Activity 1 ­ Physical Attributes: -give each student a penny, nickel, dime, and quarter -give students

  5. High SO{sub 2} removal efficiency testing. Quarterly status report, October 1994--December 1994

    SciTech Connect (OSTI)

    Blythe, G.

    1995-02-03

    This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO{sub 2} Removal Testing{close_quotes}, for the time period 1 October through 31 December 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low-capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades to be evaluated primAllily involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation (NYSEG) Kintigh Station (Option V). By the beginning of the fourth quarter of 1994, testing had been completed for the base project and for all options. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1995. Section 5 contains a brief acknowledgement.

  6. Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravelInformationCollectionGrid Workshop, AprilDepartment of Energy 74: Quarterly

  7. Decontamination systems information and research program. Quarterly report, April--June 1995

    SciTech Connect (OSTI)

    1995-07-01

    West Virginia University (WVU) and the US Department of Energy Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement on August 29, 1992 titled `Decontamination Systems Information and Research Programs`. Requirements stipulated by the Agreement require WVU to submit Technical Progress reports on a quarterly basis. This report contains the efforts of the fourteen research projects comprising the Agreement for the period April 1 to June 30, 1995. During this period three new projects have been funded by the Agreement. These projects are: (1) WERC National Design Contest, (2) Graduate Interns to the Interagency Environmental Technology Office under the National Science and Technology Council, and (3) WV High Tech Consortium.

  8. Enforcement actions: Significant actions resolved. Quarterly progress report, April--June 1993: Volume 12, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  9. Fossil-energy program. Quarterly progress report for June 30, 1983

    SciTech Connect (OSTI)

    McNeese, L.E.

    1983-08-01

    This quarterly report covers the progress made during the period March 31 through June 30 for the Oak Ridge National Laboratory research and development projects that are carried out in support of the increased utilization of coal and other fossil fuels as sources of clean energy. These projects are supported by various parts of DOE including Fossil Energy, Basic Energy Sciences, Office of Health and Environmental Research, Office of Environmental Compliance and Overview, the Electric Power Research Institute, and by the Tennessee Valley Authority and the EPA Office of Research and Development through inter-agency agreement with DOE.

  10. Research and development for the declassification productivity initiative. Quarterly report, January 1997--August 1997

    SciTech Connect (OSTI)

    Bessonet, C.G. de

    1997-03-05

    The highlight for the first quarter was the presentation of research progress and findings at the DPI Symposium on March 5, 1997. Since that presentation, additional progress was slowed down due to the decreased budget funding for year two, and consequently, the decrease in time-effort of the principal investigators. This report summarizes the progress in each of the topical areas to date. A research article has been prepared for publication for the Optical Character Recognition project; two progress reports are included for the Logical Analysis project; and two progress reports for the Knowledge Representation project. Research activities for the Tipster Technology project will resume this fall.

  11. Geothermal direct-heat utilization assistance. Quarterly report, October--December 1996

    SciTech Connect (OSTI)

    NONE

    1996-12-31

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-97. It describes 174 contracts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  12. Results For The Fourth Quarter 2014 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

    SciTech Connect (OSTI)

    Crawford, C.

    2015-09-30

    This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2014 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  13. Navistar eStar Vehicle Performace Evaluation - 3rd Quarter 2013; Energy Efficiency & Renewable Energy (EERE)

    SciTech Connect (OSTI)

    Ragatz, A.; Duran, A.; Walkowicz, K.

    2013-10-01

    The Fleet Test and Evaluation Team at the U.S. Department of Energy's National Renewable Energy Laboratory is evaluating and documenting the performance of electric and plug-in hybrid electric drive systems in medium duty trucks across the nation. U.S. companies participating in this evaluation project received funding from the American Recovery and Reinvestment Act to cover part of the cost of purchasing these vehicles. Through this project, Navistar will build and deploy all-electric medium-duty trucks. The trucks will be deployed in diverse climates across the country. This report covers the third quarter of 2013.

  14. H-Area Seepage Basins. Third quarter 1990 groundwater quality assessment report

    SciTech Connect (OSTI)

    Stejskal, G.

    1990-12-01

    During the third quarter of 1990 the wells which make up the H-Area Seepage Basins (H-HWMF) monitoring network were sampled. Laboratory analyses were performed to measure levels of hazardous constituents, indicator parameters, tritium, nonvolatile beta, and gross alpha. A Gas Chromatograph Mass Spectrometer (GCMS) scan was performed on all wells sampled to determine any hazardous organic constituents present in the groundwater. The primary contaminants observed at wells monitoring the H-Area Seepage Basins are tritium, nitrate, mercury, gross alpha, nonvolatile beta, trichloroethylene (TCE), tetrachloroethylene, lead, cadmium, arsenic, and total radium.

  15. MHD Integrated Topping Cycle Project. Eighteenth quarterly technical progress report, November 1, 1991--January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    This eighteenth quarterly technical progress report of the MHD Integrated Topping cycle Project presents the accomplishments during the period November 1, 1991 to January 31, 1992. The precombustor is fully assembled. Manufacturing of all slagging stage components has been completed. All cooling panels were welded in place and the panel/shell gap was filled with RTV. Final combustor assembly is in progress. The low pressure cooling subsystem (LPCS) was delivered to the CDIF. Second stage brazing issues were resolved. The construction of the two anode power cabinets was completed.

  16. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1995--September 1995

    SciTech Connect (OSTI)

    Lienau, P.

    1995-12-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-95. It describes 80 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal energy cost evaluation and marketing strategy for geothermal district heating. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  17. Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2010-10-26

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, P

  18. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, July 1-September 30, 1997

    SciTech Connect (OSTI)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has completed one year of activity, accelerating the pace of cofiring development. Cofiring tests were completed at the Seward Generating Station of GPU Genco and at the Michigan City Generating Station of NIPSCO. The NYSEG work at Greenidge Station resulted in a workable, low cost method for injecting biofuels into coal-fired PC boilers. Support studies and modeling continued to provide analytics for the cofiring program. This report summarizes the activities during the fourth quarter of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon the results of testing in order to highlight the progress at utilities.

  19. Results For The Second Quarter 2013 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

    SciTech Connect (OSTI)

    Bannochie, Christopher J.

    2013-07-31

    This report details the chemical and radionuclide contaminant results for the characterization of the 2013 Second Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by Saltstone Facility Engineering (SFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  20. Results for the second quarter 2014 tank 50 WAC slurry sample chemical and radionuclide contaminants

    SciTech Connect (OSTI)

    Bannochie, C.

    2014-09-04

    This report details the chemical and radionuclide contaminant results for the characterization of the 2014 Second Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  1. Results For The Third Quarter 2013 Tank 50 WAC Slurry Sample

    SciTech Connect (OSTI)

    Bannochie, Christopher J.

    2013-11-26

    This report details the chemical and radionuclide contaminant results for the characterization of the 2013 Third Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  2. Results for the Third Quarter 2012 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminants

    SciTech Connect (OSTI)

    Bannochie, C. J.

    2012-10-26

    This report details the chemical and radionuclide contaminant results for the characterization of the 2012 Third Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Waste Solidification Engineering (WSE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  3. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January 1 - March 31, 2005

    SciTech Connect (OSTI)

    DL Sisterson

    2005-03-31

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The United States Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for this second quarter for the Southern Great Plains (SGP) site is 2052 hours (0.95 × 2,160 hours this quarter). The annual OPSMAX for the North Slope Alaska (NSA) site is 1944 hours (0.90 × 2,160), and that for the Tropical Western Pacific (TWP) site is 1836 hours (0.85 × 2,160). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter.

  4. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report April 1 - June 30, 2005

    SciTech Connect (OSTI)

    DL Sisterson

    2005-06-30

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The United States Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 × 2,184 hours this quarter). The annual OPSMAX for the North Slope Alaska (NSA) site is 1,965.6 hours (0.90 × 2,184), and that for the Tropical Western Pacific (TWP) site is 1,856.4 hours (0.85 × 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 (0.95 × 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter

  5. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report October 1 - December 31, 2005

    SciTech Connect (OSTI)

    DL Sisterson

    2005-12-31

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,097.6 hours (0.95 × 2,208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1,987.2 hours (0.90 × 2,208), and that for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 × 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,097.6 hours (0.95 × 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter.

  6. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January-March 2006

    SciTech Connect (OSTI)

    DL Sisterson

    2006-03-31

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year; and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter for the Southern Great Plains (SGP) site is 2,052 hours (0.95 × 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944 hours (0.90 × 2,160), and that for the Tropical Western Pacific (TWP) locale is 1,836 hours (0.85 × 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,052 hours (0.95 × 2,160). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter.

  7. Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995

    SciTech Connect (OSTI)

    1995-05-01

    The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

  8. Advanced direct liquefaction concepts for PETC generic units: Quarterly technical progress report, October--December 1994

    SciTech Connect (OSTI)

    NONE

    1995-02-01

    Progress during this quarter on a number of tasks is described. Task 2.3.1, Iron-based dispersed catalysts, investigated impregnated catalysts and the interactions of Fe, Ni, and Mo in coal liquefaction, as well as particulate catalysts. Work is also reported for Task 1.2, Laboratory support, which involves testing coals for liquefaction activity; Task 2.1.2.1, Pretreatment work--Dewaxing, which is investigating a solvent extraction method for dewaxing the Wilsonville heavy distillate; and Task 2.4.2, Solids separation, which involves deashing Wilsonville resid fractions.

  9. Microbial field pilot study. [Quarterly report], July 1, 1992--September 30, 1992

    SciTech Connect (OSTI)

    Knapp, R.M.; McInerney, M.J.; Menzie, D.E.

    1991-12-06

    The objective of this project is to perform a microbial enhanced oil recovery field pilot test in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate-reducing bacteria will be stimulated to selectively plug flow paths which have been preferentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. During this quarter an additional tracer study was performed in the field to determine pre-treatment flow paths and the first nutrients were injected. 2 figs.

  10. Energy Emergency Preparedness Quarterly Vol 3, Issue 2 - Spring/Summer 2014

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor Innovative Solar PowerTribesDepartment of Energy each quarter.|

  11. Natural Gas Imports and Exports - First Quarter Report 2012 | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOEDepartment ofProgram |(Upstate104-113]Energy First Quarter Report

  12. Natural Gas Imports and Exports - First Quarter Report 2013 | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOEDepartment ofProgram |(Upstate104-113]Energy First Quarter

  13. Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: Third Quarter 1999

    SciTech Connect (OSTI)

    R. Evans

    2000-03-01

    The Environmental Science and Research Foundation conducts an offsite environmental surveillance program for the Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the third quarter of 1999 is based on 704 samples of air, fine particulates, atmospheric moisture, precipitation, milk, and food. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radiation, worldwide fallout from past nuclear weapons testing, and nuclear operations around the world. No! measured concentrations could be directly attributed to operations at the INEEL. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

  14. Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: Fourth Quarter 1998

    SciTech Connect (OSTI)

    T. Saffle; R. Evans

    1999-08-01

    The Environmental Science and Research Foundation conducts the Offsite Environmental Surveillance Program at the US Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the fourth quarter 1998 is based on 622 samples collected of air, fine particulates, atmospheric moisture, precipitation, water, milk, potatoes, and game animals. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radioactivity, worldwide fallout from past nuclear weapons testing, an! d nuclear operations around the world. No measured concentrations could be directly attributed to operations at the INEEL, although statistical differences did exist between on-site and distant gross beta concentrations. No evidence could be found to link these differences with a specific INEEL source. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

  15. Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: First Quarter 1999

    SciTech Connect (OSTI)

    R. Evans

    1999-09-01

    The Environmental Science and Research Foundation conducts an Offsite Environmental Surveillance Program at the US Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the first quarter 1999 is based on 564 samples of air (including airborne radioactivity, fine particulates, and atmospheric moisture), precipitation, milk, and wild game tissues. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radiation, worldwide fallout from past nuclear weapons ! testing, an d nuclear operations around the world. No measured concentrations could be directly attributed to operations at the INEEL. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

  16. Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: Second Quarter 1999

    SciTech Connect (OSTI)

    R. Evans

    1999-12-01

    The Environmental Science and Research Foundation conducts an Offsite Environmental Surveillance Program at the US Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the second quarter 1999 is based on 618 samples of air (including airborne radioactivity, fine particulates, and atmospheric moisture), precipitation, milk, drinking water, sheep, wild game tissues, and environmental radiation. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radiation, worldwide fallout from past nuclear weapons testing, and nuclear operations around the world. No measured concentrations could be directly attributed to operations at the INEEL. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

  17. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation of chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.

  18. Westinghouse Hanford Company health and safety performance report: Third quarter calendar year 1994

    SciTech Connect (OSTI)

    Lansing, K.A.

    1994-11-01

    Injury data compiled this quarter shows that Westinghouse Hanford Company (WHC)/Boeing Computer Services, Richland (BCSR) have accomplished a thirty-one percent reduction in lost and/or restricted workday cases from fiscal year 1993 to fiscal year 1994. During the third quarter, WHC/BCSR achieved over one million workhours without a lost workday away injury/illness. This was achieved during the time period from July 16 through August 11, 1994. The contributing experience of each WHC department in attaining this significant improvement is described, along with tables charting specific trends. Starting in fiscal year 1995, the ALARA goal process is undergoing a transition from a calendar year to a fiscal year cycle. Although this appears to run counter to reporting on an annual basis, the purpose of this change is to align the ALARA goal-setting process with the fiscal year budgeting process. It is anticipated that this change will provide facility ALARA Committees another tool for establishing ALARA performance goals that are more meaningful, realistic, and challenging.

  19. Idaho National Engineering and Environmental Laboratory Radiological Control Performance Indicator Report - First Quarter, Calendar Year 1999

    SciTech Connect (OSTI)

    Hinckley, F.L.

    1999-05-01

    This Performance Indicator Report is provided in accordance with Article 133 of the INEEL Radiological Control Manual. The INEEL collective occupational radiation deep dose is 63.034 person-rem year to date, compared to a goal of 83.1 person-rem. During the fourth quarter, all areas experienced deletions of work resulting from the Maintenance Stand Down. This reduction in work is a primary factor in the difference in the year end dose and the ALARA goal. The work will be completed during CY-99. Beginning in CY-98, a numeric Radiological Performance Index (RPI) is being used to compare radiological performance. The RPI takes into consideration frequency and severity of events such as skin contaminations, clothing contaminations, spills, exposures to radiation exceeding limits, and positive internal dose. The RPI measures the cost of these events in cents per hour of radiological work performed. To make the RPI meaningful, tables have been prepared to show the facility that contributes to the values used. The data are compared on a quarterly basis to the prior year to show measurable performance.

  20. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    SciTech Connect (OSTI)

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  1. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    SciTech Connect (OSTI)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  2. Geothermal direct-heat utilization assistance. Quarterly progress report, January--March 1993

    SciTech Connect (OSTI)

    Lienau, P.

    1993-03-30

    CHC (Geo-Heated Center) staff provided assistance to 103 requests from 26 states, and from Canada, Egypt, Mexico, China, Poland and Greece. A breakdown of the requests according to application include: space and district heating (19), geothermal heat pumps (24), greenhouses (10), aquaculture (4), industrial (4), equipment (3), resources (27), electric power (2) and other (20). Progress is reported on: (1) evaluation of lineshaft turbine pump problems, (2) pilot fruit drier and (3) geothermal district heating marketing tools and equipment investigation. Four presentations and two tours were conducted during the quarter, GHC Quarterly Bulletin Vol. 14, No. 4 was prepared, 14 volumes were added to the library and information was disseminated to 45 requests. Progress reports are on: (1) GHP Teleconference 93, (2) California Energy Buys Glass Mountain Prospect from Unocal and Makes Deal for Newberry Caldera, (3) New Power Plant Planned, (4) Vale to Get Power Plant, (5) BPA Approves Geothermal Project, (6) Update: San Bernardino Reservoir Study, (7) Twenty-nine Palms Geothermal Resources, (8) Geo-Ag Heat Center, Lake County, and (9) Update: Geothermal Wells at Alturas.

  3. Quarterly technical progress report, July-September 1982 on Energy Conversion Research and Development Programs

    SciTech Connect (OSTI)

    Not Available

    1983-12-01

    Detail design work was resumed on the superheater. Satisfactory bids were received for the air heater and lowest price responsive bidder was chosen. The conduct of three tests in the LMF1C series is reported. The status of the environmental monitoring program is reviewed. Preliminary analyses of the test data from the three tests conducted during the quarter are included. The heat fluxes, combustor pressure and combustor efficiencies are reported. The performance of the nozzle, diagnostic (Hall) channel and diffuser is compared with an analytical model for each test run. The performance of the new diffuser which was installed during the quarter is discussed. The test results from the downstream components; i.e. slag screen, radiant furnace, secondary combustor and materials test module, are discussed. Slag removal from the radiant furnace, refractory performance and metals performance is covered. A summary report is included on the results of the cold flow modeling of the secondary combustor, which involved variations in relative velocity of the secondary air, the angle of injection and the flow constriction. Diagnostic support of testing activities is described, including the use of the laser doppler velocimeter (LDV) for the secondary combustor modeling. Luminosity and line reversal temperature measurements were made in support of the CFFF tests. A photodiode line reversal system has been designed which has the promise of being more reliable, easier to install on operational equipment and cheaper.

  4. RCRA groundwater monitoring data. Quarterly report, April 1, 1995--June 30, 1995

    SciTech Connect (OSTI)

    1995-10-01

    Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between April and June 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter, but also data from earlier sampling events that were not previously reported.

  5. High SO{sub 2} removal efficiency testing. Quarterly report, July - September 1996

    SciTech Connect (OSTI)

    Blythe, G.

    1996-07-01

    This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, ``High Efficiency SO{sub 2} Removal Testing,`` for the time period 1 July through 30 September 1996. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company`s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document provides a brief overview of the status of technical efforts on this project, including those efforts anticipated for the first quarter of calendar year 1996, summarizes results from prior quarters, and contains a brief acknowledgment. 13 refs.

  6. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    SciTech Connect (OSTI)

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  7. Catalytic conversion of light alkanes: Quarterly report, January 1-March 31, 1992

    SciTech Connect (OSTI)

    Biscardi, J.; Bowden, P.T.; Durante, V.A.; Ellis, P.E. Jr.; Gray, H.B.; Gorbey, R.G.; Hayes, R.C.; Hodge, J.; Hughes, M.; Langdale, W.A.; Lyons, J.E.; Marcus, B.; Messick, D.; Merrill, R.A.; Moore, F.A.; Myers, H.K. Jr.; Seitzer, W.H.; Shaikh, S.N.; Tsao, W.H.; Wagner, R.W.; Warren, R.W.; Wijesekera, T.P.

    1997-05-01

    The first Quarterly Report of 1992 on the Catalytic Conversion of Light Alkanes reviews the work done between January 1. 1992 and March 31, 1992 on the Cooperative Agreement. The mission of this work is to devise a new catalyst which can be used in a simple economic process to convert the light alkanes in natural gas to oxygenate products which can either be used as clean-burning, high octane liquid fuels, as fuel components or as precursors to liquid hydrocarbon transportation fuel. During the past quarter we have continued to design, prepare, characterize and test novel catalysts for the mild selective reaction of light hydrocarbons with air or oxygen to produce alcohols directly. These catalysts are designed to form active metal oxo (MO) species and to be uniquely active for the homolytic cleavage of the carbon-hydrogen bonds in light alkanes producing intermediates which can form alcohols. We continue to investigate three molecular environments for the active catalytic species that we are trying to generate: electron-deficient porphryinic macrocycles (PHASE I), polyoxometallates (PHASE II), and regular oxidic lattices including zeolites and related structures as well as other molecular surface structures having metal oxo groups (PHASE III).

  8. Tampa Electric Company - DOE IGCC project. Quarterly report, July 1 - September 30, 1996

    SciTech Connect (OSTI)

    1996-12-31

    The third quarter of 1996 has resulted in the completion of over five (5) years of extensive project development, design, construction and start-up of the 250 MW Polk Power Station Unit {number_sign}1 IGCC Project. the combined cycle performance test was completed on June 18, 1996. This test demonstrated that on distillate fuel, the combined cycle achieved a net output of 222,299 KW with a net heat rate of 6,868 BTU/KW. This is about 3.86% and 2.76% better than the guaranteed values of 214,040 KW and 7,063 BTU/KW respectively. During the third quarter of 1996, the combustion turbine was run on syngas two (2) different times for a combined total of about seven hours. Attachment {number_sign}4 shows graphically the transfer from oil to syngas. Emission levels were generally acceptable even though no specific emissions tuning was completed by GE and the emissions monitoring equipment was not yet completely operational.

  9. Quarterly report of RCRA groundwater monitoring data for period October 1, 1993--December 31, 1993

    SciTech Connect (OSTI)

    Jungers, D.K.

    1994-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between November 20 and February 25, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

  10. Fundamental mechanisms in flue gas conditioning. Quarterly report, October 1992--December 1992

    SciTech Connect (OSTI)

    Snyder, T.R.; Bush, P.V.

    1993-01-20

    We performed a wide variety of laboratory analyses during the past quarter. As with most of the work we performed during the previous quarter, our recent efforts were primarily directed toward the determination of the effects of adsorbed water on the cohesivity and tensile strength of powders. We also continued our analyses of dust cake ashes that have had the soluble compounds leached from their particle surfaces by repeated washings with water. Our analyses of leached and unleached dust cake ashes continued to provide some interesting insights into effects that compounds adsorbed on surfaces of ash particles can have on bulk ash behavior. As suggested by our literature review, our data indicate that water adsorption depends on particle morphology and on surface chemistry. Our measurements of tensile strength show, that for many of the samples we have analyzed a relative minimum in tensile strength exists for samples conditioned and tested at about 30% relative humidity. In our examinations of the effects of water conditioning on sample cohesivity, we determined that in the absence of absorption of water into the interior of the particles, cohesivity usually increases sharply when environments having relative humidities above 75% are used to condition and test the samples. Plans are under way to condition selected samples with (NH{sub 4}){sub 2}SO{sub 4}, NH{sub 4}HSO{sub 4}, CaCl{sub 2}, organosiloxane, and SO{sub 3}. Pending approval, we will begin these conditioning experiments, and subsequent analyses of the conditioned samples.

  11. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    SciTech Connect (OSTI)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

  12. Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report: First quarter 1992

    SciTech Connect (OSTI)

    Thompson, C.Y.

    1992-06-01

    During first quarter 1992, 18 groundwater monitoring wells of the AMB series at the Metallurgical Laboratory Hazardous Waste Management Facility (Metlab HWMF) at Savannah River Plant were visited for sampling. Groundwater samples were analyzed for certain heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. This report describes the results that exceeded the US Environmental Protection Agency Primary Drinking Water Standards (PDWS) and the Savannah River Site flagging criteria during the quarter. Tetrachloroethylene exceeded the PDWS in wells AMB 4A, 5, and 7A; trichloroethylene exceeded the PDWS in wells AMB 4A, 4B, 4D, 5, and 7A; and total alpha-emitting radium (radium-224 and radium-226) exceeded the PDWS in well AMB 5. Total organic halogens exceeded the Flag 2 criterion in wells AMB 4A, 5, 6, 7A, 7B, and IODD; manganese was elevated in wells AMB 4D and TODD; iron was elevated in well AMB TODD; and pH was elevated in well AMB 10A.

  13. Synthesis of methyl methacrylate from coal-derived syngas: Quarterly report,, October 1-December 31, 1997

    SciTech Connect (OSTI)

    1998-09-01

    Research Triangle Institute (RTI), Eastman Chemical Company, and Bechtel collectively are developing a novel process for the synthesis of methyl methacrylate (MMA) from coal-derived syngas that consists of three steps of synthesis of a propionate, its condensation with formaldehyde, and esterification of resulting methacrylic acid (MAA) with methanol to produce MMA. Over the last quarter, Eastman developed two new processes which have resulted in two new invention reports. One process deals with carbonylation of benzyl ether which represents a model for coal liquefaction and the second focuses on the acceleration of carbonylation rates for propionic acid synthesis, via use of polar aprotic solvents. These two inventions are major improvements in the novel Mo-catalyzed homogeneous process for propionic acid synthesis technology, developed by Eastman. Over the last quarter, RTI completed three reaction cycles and two regeneration cycles as a part of long-term reaction regeneration cycle study on a 10% Nb{sub 2}O{sub 5}/Si0{sub 2} catalyst, for vapor phase condensation reaction of formaldehyde with propionic acid.

  14. Technical Issues Map for the NHI System Interface and Support Systems Area: 2nd Quarter FY07

    SciTech Connect (OSTI)

    Steven R. Sherman

    2007-03-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway in the 2nd quarter of FY07.

  15. Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

  16. QuarterlyCouncilNorthwest Power and Conservation Council > Summer 2013 According to the report,"BPA's analysis

    E-Print Network [OSTI]

    QuarterlyCouncilNorthwest Power and Conservation Council > Summer 2013 According to the report long-term value through the avoided costs of developing new resources or having to purchase Recommendations In a recently released analysis, the Bonneville Power Administration set out to answer a simple

  17. The Amarillo National Resource Center for Plutonium. Quarterly progress detailed report, 1 November 1996--31 January 1997

    SciTech Connect (OSTI)

    NONE

    1997-03-01

    Progress for this quarter is given for each of the following Center programs: (1) plutonium information resource; (2) advisory function (DOE and state support); (3) environmental, public health and safety; (3) communication, education, and training; and (4) nuclear and other material studies. Both summaries of the activities and detailed reports are included.

  18. CORNELL'S QUARTERLY MAGAZINE SPRING 2010 19 -LIBRARY STUDENT WORKERS 20 -CORNELL CARES DAY 26 -MENS BASKETBALL TRIO

    E-Print Network [OSTI]

    Angenent, Lars T.

    University's approach to entrepreneurship is focused on experiential learning, teaching students how to thinkCORNELL'S QUARTERLY MAGAZINE SPRING 2010 19 - LIBRARY STUDENT WORKERS 20 - CORNELL CARES DAY 26 - MENS BASKETBALL TRIO NURTURING BIG IDEAS CORNELL GIVES HEAD START TO STUDENT INNOVATORS #12;EZRA Spring

  19. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 3 2012 Composite Data Products

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.; Post, M.

    2013-01-01

    This report from the U.S. Department of Energy's National Renewable Energy Laboratory includes early fuel cell market composite data products for the third quarter of 2012 for American Recovery and Reinvestment Act (ARRA) and combined (IAA, DLA, ARRA) deployment projects.

  20. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Fourth Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-12-02

    This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNL’s Legal Services were submitted to all the parties for signatures.