Powered by Deep Web Technologies
Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Short-term energy outlook quarterly projections. Third quarter 1997  

SciTech Connect (OSTI)

This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

NONE

1997-07-01T23:59:59.000Z

2

Short-term energy outlook. Quarterly projections, second quarter 1996  

SciTech Connect (OSTI)

The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

NONE

1996-04-01T23:59:59.000Z

3

Short-term energy outlook. Quarterly projections, Third quarter 1995  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

NONE

1995-08-02T23:59:59.000Z

4

Short-term energy outlook: Quarterly projections. Second quarter 1995  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

NONE

1995-05-02T23:59:59.000Z

5

Short-term energy outlook. Quarterly projections, third quarter 1996  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

NONE

1996-07-01T23:59:59.000Z

6

Short-term energy outlook: Quarterly projections, fourth quarter 1997  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

NONE

1997-10-14T23:59:59.000Z

7

Short-term energy outlook quarterly projections. First quarter 1994  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

Not Available

1994-02-07T23:59:59.000Z

8

Short-term energy outlook. Quarterly projections, first quarter 1996  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

NONE

1996-02-01T23:59:59.000Z

9

Short-term energy outlook. Quarterly projections, first quarter 1995  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

Not Available

1995-02-01T23:59:59.000Z

10

Short-term energy outlook: Quarterly projections, second quarter 1997  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

NONE

1997-04-01T23:59:59.000Z

11

Short-term energy outlook, Quarterly projections. Third quarter 1993  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

NONE

1993-08-04T23:59:59.000Z

12

Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

Not Available

1993-11-05T23:59:59.000Z

13

Short-term energy outlook quarterly projections: First quarter 1993  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.). The forecast period for this issue of the Outlook extends from the first quarter of 1993 through the fourth quarter of 1994. Values for the fourth quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

Not Available

1993-02-03T23:59:59.000Z

14

Short-term energy outlook: Quarterly projections, Third quarter 1992  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

Not Available

1992-08-01T23:59:59.000Z

15

Short-term energy outlook, quarterly projections, second quarter 1998  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

NONE

1998-04-01T23:59:59.000Z

16

Short-term energy outlook. Quarterly projections, Third quarter 1994  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

Not Available

1994-08-02T23:59:59.000Z

17

Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998  

SciTech Connect (OSTI)

This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

NONE

1999-02-01T23:59:59.000Z

18

MicroBooNE Project Quarterly Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fundProject Quarterly Reports Fiscal 2010 Qtr-3 Apr-May-Jun

19

Short-term energy outlook, quarterly projections, first quarter 1998  

SciTech Connect (OSTI)

The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

NONE

1998-01-01T23:59:59.000Z

20

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #23, April-June 2009  

SciTech Connect (OSTI)

April to June, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009  

SciTech Connect (OSTI)

July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-10-01T23:59:59.000Z

22

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #22, January - March 2009  

SciTech Connect (OSTI)

January to March, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Not Available

2009-04-01T23:59:59.000Z

23

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #20, July-September 2008  

SciTech Connect (OSTI)

July to September, 2008 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D. J.

2008-12-01T23:59:59.000Z

24

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #25, October - December 2009  

SciTech Connect (OSTI)

October to December, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2010-01-01T23:59:59.000Z

25

Minnesota Agripower Project. Quarterly report, July 1996--September 1996  

SciTech Connect (OSTI)

Program status and accomplishments for the quarter are summarized in this report. The Agri-Power project is aimed at the development of alfalfa as a biomass fuel for power generation. Components of the project include varietal evaluation and selection; development of harvest, storage, and transportation systems; pellet production; and assessment of gasification and other combustion systems. Major items reported for the quarter include: (1) Design Package - economic analysis, (2) Review and Confirmation of the Alfalfa Feedwater Supply - sampling studies and resistance studies of varietals, and (3) Project Management, Engineering, and Administration - evaluation of gasification and power generating cycles.

Hanson, C.

1997-01-01T23:59:59.000Z

26

Weldon Spring Site Remedial Action Project quarterly environmental data summary for second quarter 1998  

SciTech Connect (OSTI)

In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the second quarter of 1998 is enclosed. The data presented constitutes the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the database during the second quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the database and KPA data are not merged into the regular database. All data received and verified during the second quarter were within a permissible range of variability, except for those listed. Above normal occurrences are cited for groundwater, air, and NPDES data. There were no above normal occurrences for springs or surface water. The attached tables present the most recent data for air and the data merged into the database during the second quarter 1998 for groundwater, NPDES, surface water, and springs.

NONE

1998-08-11T23:59:59.000Z

27

Architecture, Engineering and Construction Sustainability Report Major Projects Quarterly Sustainability Report  

E-Print Network [OSTI]

1 Architecture, Engineering and Construction Sustainability Report Major Projects Quarterly Sustainability Report June 2011 Alice Crocker Lloyd Hall Renovation

Kamat, Vineet R.

28

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #9, October-December 2005  

SciTech Connect (OSTI)

Volume 9 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D. J.

2006-01-01T23:59:59.000Z

29

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #10, January-March 2006  

SciTech Connect (OSTI)

Volume 10 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Not Available

2006-04-01T23:59:59.000Z

30

National Bioenergy Center Biochemical Platform Process Integration Project: Quarterly Update #18, January-March 2008  

SciTech Connect (OSTI)

January-March, 2008 edition of the quarterly update for the National Bioenergy Center's Biochemical Platform Integration Project.

Schell, D.

2008-04-01T23:59:59.000Z

31

National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #12, July-September 2006  

SciTech Connect (OSTI)

Volume 12 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

Schell, D.

2006-10-01T23:59:59.000Z

32

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #21, October - December 2008  

SciTech Connect (OSTI)

October to December, 2008 edition of the National Bioenergy Center?s Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-01-01T23:59:59.000Z

33

Short-term energy outlook. Quarterly projections, 2nd quarter 1994  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

Not Available

1994-05-01T23:59:59.000Z

34

Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement  

SciTech Connect (OSTI)

The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

NONE

1994-03-31T23:59:59.000Z

35

Yucca Mountain Site Characterization Project technical data catalog quarterly supplement  

SciTech Connect (OSTI)

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1995-03-31T23:59:59.000Z

36

BX in situ oil shale project. Quarterly technical progress report, September 1-November 30, 1981  

SciTech Connect (OSTI)

September 1, 1981-November 30, 1981, was the fourth consecutive quarter of superheated steam injection at the BX In Situ Oil Shale Project. During the quarter, 117,520 barrels of water as steam were injected into project injection wells at an average wellhead temperature of 715/sup 0/F and an average wellhead pressure of 1378 PSIG. During the same period, 148,516 barrels of fluid were produced from the project production wells for a produced-to-injected fluid ratio of 1.26 to 1.0. Net oil production for the quarter was 169 barrels.

Dougan, P.M.

1981-12-20T23:59:59.000Z

37

Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

NONE

1998-10-01T23:59:59.000Z

38

E-Print Network 3.0 - assistance quarterly project Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project Page: << < 1 2 3 4 5 > >> 1 Assembly and Testing of an On-Farm Manure to Energy Conversion BMP for Animal Waste Pollution Control Summary: for the upcoming quarters....

39

National Bioenergy Center--Biochemical Platform Integration Project: Quarterly Update, Fall 2010  

SciTech Connect (OSTI)

Fall 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: rapid analysis models for compositional analysis of intermediate process streams; engineered arabinose-fermenting Zymomonas mobilis strain.

Schell, D.

2010-12-01T23:59:59.000Z

40

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #26, January - March 2010  

SciTech Connect (OSTI)

January-March, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding and improving sugar measurements in biomass hydrolysates; expansion of the NREL/DOE Biochemical Pilot Plant.

Schell, D.

2010-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993  

SciTech Connect (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

Not Available

1993-12-31T23:59:59.000Z

42

Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994  

SciTech Connect (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

Not Available

1994-08-01T23:59:59.000Z

43

Electric and hybrid vehicle project. Quarterly report of private-sector operations, first quarter 1982  

SciTech Connect (OSTI)

As of January 1, 1982 sixteen private-sector site operators at 30 sites in the US were involved in electric and hybrid electric-powered vehicle demonstration programs. Data for 1981 and the first quarter of 1982 are presented on vehicle selection, miles accumulated, energy usage, maintenance requirements, reliability and operating performance for demonstration vehicles at each site. (LCL)

None

1982-06-01T23:59:59.000Z

44

TIDD PFBC Demonstration Project. Second quarterly report, 1994  

SciTech Connect (OSTI)

Major activities during this period include: (1) The unit operated for 1529 hours on coal, bringing the grand total for coal fire through the end of the quarter to 7847 hours. (2) During the quarter, the Tidd Plant set a new record for its longest continuous run on coal; 1079 hours, surpassing its previous record of 740 hours set in June-July of 1992. (3) The unit availability for the first half of 1994 was 54.7%. (4) There were four gas turbine starts, eight bed preheater starts, and six operating periods on coal. (5) During this quarter, total gross generation was 71,115 MWH, the peak unit output for one hour was 59 MWH, and the coal consumption was 35,696 tons. (6) Fifteen performance tests have been conducted since the start of the fourth year of operation. Eleven of the tests were conducted during the record run during May and June. (7) Agreements were finalized with the DOE, Ohio Coal Development Office, and technology vendors for funding of the fourth year of operation of the plant.

NONE

1997-07-01T23:59:59.000Z

45

National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Summer 2011 (Newsletter)  

SciTech Connect (OSTI)

Summer 2011 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: evaluating new analytical techniques for measuring soluble sugars in the liquid portion of biomass hydrolysates, and measurement of the fraction of insoluble solids in biomass slurries.

Not Available

2011-09-01T23:59:59.000Z

46

West Hackberry Tertiary Project. Quarterly technical progress report, January 1, 1996--March 31, 1996  

SciTech Connect (OSTI)

The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomic. The first quarter of 1996 was outstanding both in terms of volume of air injected and low cost operations. More air was injected during this quarter than in any preceding quarter. The compressors experienced much improved run time with minimal repairs. Low operating costs resulted from no repairs required for injection or production wells. A discussion of the following topics are contained herein: (1) performance summary for the injection and production wells, (2) air compressor operations, (3) updated bottom hole pressure data, (4) technology transfer activities and (5) plans for the upcoming quarter.

Gillham, T.; Cerveny, B.; Turek, E.

1996-04-10T23:59:59.000Z

47

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #28, Spring 2011  

SciTech Connect (OSTI)

Spring 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program sessions and special topic sessions; assessment of waste water treatment needs; and an update on new arabinose-to-ethanol fermenting Zymomonas mobilis strains.

Schell, D. J.

2011-04-01T23:59:59.000Z

48

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #27, April - June 2010  

SciTech Connect (OSTI)

April-June, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding performance of alternative process configurations for producing ethanol from biomass; investigating Karl Fischer Titration for measuring water content of pretreated biomass slurries.

Schell, D.

2010-07-01T23:59:59.000Z

49

National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010  

SciTech Connect (OSTI)

Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

Schell, D.

2011-02-01T23:59:59.000Z

50

Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994  

SciTech Connect (OSTI)

This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

Not Available

1994-08-18T23:59:59.000Z

51

Geothermal policy project. Quarterly report, March 1-May 30, 1980  

SciTech Connect (OSTI)

Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

Connor, T.D.

1980-06-01T23:59:59.000Z

52

Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994  

SciTech Connect (OSTI)

The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

Not Available

1994-05-01T23:59:59.000Z

53

HIGH INTENSITY LINAC DRIVER FOR THE SPIRAL-2 PROJECT : DESIGN OF SUPERCONDUCTING 88 MHZ QUARTER WAVE  

E-Print Network [OSTI]

HIGH INTENSITY LINAC DRIVER FOR THE SPIRAL-2 PROJECT : DESIGN OF SUPERCONDUCTING 88 MHZ QUARTER to the required energy. · Capability to accelerate ion beams of q/A=1/6 (up to 1 mA) in the future. The initial Abstract A superconducting linac driver, delivering deuterons with an energy up to 40 MeV (5 mA) and heavy

Paris-Sud XI, Université de

54

UNFINISHED JOURNEY Project. Quarterly report, April 1995--June 1995  

SciTech Connect (OSTI)

In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994 to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

NONE

1998-02-01T23:59:59.000Z

55

UNFINISHED JOURNEY Project. Quarterly report, July 1995--September 1995  

SciTech Connect (OSTI)

In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

NONE

1998-02-01T23:59:59.000Z

56

Minnesota agripower project. Quarterly report, April--June 1997  

SciTech Connect (OSTI)

The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

Baloun, J.

1997-07-01T23:59:59.000Z

57

National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Winter 2011-2012 (Newsletter)  

SciTech Connect (OSTI)

Winter 2011-2012 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: 34th Symposium on Biotechnology for Fuels and Chemicals; feasibility of NIR spectroscopy-based rapid feedstock reactive screening; demonstrating integrated pilot-scale biomass conversion. The Biochemical Process Integration Task focuses on integrating the processing steps in enzyme-based lignocellulose conversion technology. This project supports the U.S. Department of Energy's efforts to foster development, demonstration, and deployment of 'biochemical platform' biorefineries that economically produce ethanol or other fuels, as well as commodity sugars and a variety of other chemical products, from renewable lignocellulosic biomass.

Not Available

2012-04-01T23:59:59.000Z

58

Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1997-10-01T23:59:59.000Z

59

Genomes to life project quarterly report June 2004.  

SciTech Connect (OSTI)

This SAND report provides the technical progress through June 2004 of the Sandia-led project, ''Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling'', funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO{sub 2} are important terms in the global environmental response to anthropogenic atmospheric inputs of CO{sub 2} and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In addition, we will develop a set of novel capabilities for inference of regulatory pathways in microbial genomes across multiple sources of information through the integration of computational and experimental technologies. These capabilities will be applied to Synechococcus regulatory pathways to characterize their interaction map and identify component proteins in these pathways. We will also investigate methods for combining experimental and computational results with visualization and natural language tools to accelerate discovery of regulatory pathways. The ultimate goal of this effort is develop and apply new experimental and computational methods needed to generate a new level of understanding of how the Synechococcus genome affects carbon fixation at the global scale. Anticipated experimental and computational methods will provide ever-increasing insight about the individual elements and steps in the carbon fixation process, however relating an organism's genome to its cellular response in the presence of varying environments will require systems biology approaches. Thus a primary goal for this effort is to integrate the genomic data generated from experiments and lower level simulations with data from the existing body of literature into a whole cell model. We plan to accomplish this by developing and applying a set of tools for capturing the carbon fixation behavior of complex of Synechococcus at different levels of resolution. Finally, the explosion of data being produced by high-throughput experiments requires data analysis and models which are more computationally complex, more heterogeneous, and require coupling to ever increasing amounts of experimentally obtained data in varying formats. These challenges are unprecedented in high performance scientific computing and necessitate the development of a companion computational infrastructure to support this effort.

Heffelfinger, Grant S.

2005-01-01T23:59:59.000Z

60

Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project  

SciTech Connect (OSTI)

The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

NONE

1992-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995  

SciTech Connect (OSTI)

The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

NONE

1995-05-01T23:59:59.000Z

62

CPC air-blown integrated gasification combined cycle project. Quarterly report, October--December 1992  

SciTech Connect (OSTI)

The overall project cost and schedule. The combustion turbine commercial operation date is scheduled for 7/1/95 with the combined cycle commercial operation date of 7/1/96. A two year demonstration period will commence after IGCC commercial operation. Details of costs on a total project and DOE Envelope basis along with detailed schedule components were covered. Major cost variances to date were discussed. The major variances this year relate to contracts which were anticipated to be finalized mid 1992 but which are not executed. These include GEESI, the ASU and key vessels. Some of these contracts are almost in place and others are scheduled for the first quarter 1993. Numerous project specifications, process flow diagrams, piping and instrument diagrams and other drawings have been reviewed and approved as part of the preliminary engineering process.

Not Available

1993-01-01T23:59:59.000Z

63

Federal assistance program. Quarterly project progress report, January 1998--March 1998  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-04-01T23:59:59.000Z

64

Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1997-01-01T23:59:59.000Z

65

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #13, October-December 2006  

SciTech Connect (OSTI)

Volume 13 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

Schell, D. J.

2007-01-01T23:59:59.000Z

66

MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991  

SciTech Connect (OSTI)

The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

Not Available

1992-03-01T23:59:59.000Z

67

Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993  

SciTech Connect (OSTI)

This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

Not Available

1993-12-31T23:59:59.000Z

68

MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991  

SciTech Connect (OSTI)

This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

Not Available

1992-02-01T23:59:59.000Z

69

GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994  

SciTech Connect (OSTI)

Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

Anderson, R.N.

1994-04-15T23:59:59.000Z

70

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1996-11-01T23:59:59.000Z

71

Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-07-01T23:59:59.000Z

72

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1994--September 1994  

SciTech Connect (OSTI)

This paper is a third quarter 1994 report of activities of the Geo-Heat Center of Oregon Institute of Technology. It describes contacts with parties during this period related to assistance with geothermal direct heat applications. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources, and equipment. Research is also being conducted on failures of vertical lineshaft turbines in geothermal wells.

Not Available

1994-10-01T23:59:59.000Z

73

Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 34, quarter ending March 31, 1983  

SciTech Connect (OSTI)

Progress achieved for the quarter ending March 1983 are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; and thermal/heavy oil. In addition, progress reports are presented for: resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovered by gravity mining; improved drilling technology; and general supporting research. (ATT)

Linville, B. (ed.) [ed.

1983-07-01T23:59:59.000Z

74

DOBEIA-0202(83/4Q) Short-Term Energy Outlook Quarterly Projections  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781Title:DOBEIA-0202(83/4Q) Short-Term Energy Outlook Quarterly

75

Strategic Petroleum Reserve quarterly report  

SciTech Connect (OSTI)

This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

Not Available

1993-08-15T23:59:59.000Z

76

Quarterly environmental data summary for first quarter 1999  

SciTech Connect (OSTI)

In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1999 is enclosed. The data presented in this constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group and merged into the database during the first quarter of 1999. KPA results for on-site total uranium analyses performed during first quarter 1999 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

NONE

1999-06-01T23:59:59.000Z

77

LLNL Underground-Coal-Gasification Project. Quarterly progress report, July-September 1981  

SciTech Connect (OSTI)

We have continued our laboratory studies of forward gasification in small blocks of coal mounted in 55-gal drums. A steam/oxygen mixture is fed into a small hole drilled longitudinally through the center of the block, the coal is ignited near the inlet and burns toward the outlet, and the product gases come off at the outlet. Various diagnostic measurements are made during the course of the burn, and afterward the coal block is split open so that the cavity can be examined. Development work continues on our mathematical model for the small coal block experiments. Preparations for the large block experiments at a coal outcrop in the Tono Basin of Washington State have required steadily increasing effort with the approach of the scheduled starting time for the experiments (Fall 1981). Also in preparation is the deep gasification experiment, Tono 1, planned for another site in the Tono Basin after the large block experiments have been completed. Wrap-up work continues on our previous gasification experiments in Wyoming. Results of the postburn core-drilling program Hoe Creek 3 are presented here. Since 1976 the Soviets have been granted four US patents on various aspects of the underground coal gasification process. These patents are described here, and techniques of special interest are noted. Finally, we include ten abstracts of pertinent LLNL reports and papers completed during the quarter.

Stephens, D.R.; Clements, W. (eds.) [eds.

1981-11-09T23:59:59.000Z

78

ISSIGreviewProject Management Institute--Information Systems Specific Interest Group Fourth Quarter 2000  

E-Print Network [OSTI]

2000 Volume 10, Number 4 Supporting Project Management in an Information Systems Environment PMI & SIG News:PMI & SIG News:PMI & SIG News:PMI & SIG News:PMI & SIG News: ISSIG Communications Update

79

E-Print Network 3.0 - alloys project quarterly Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Verification Alain... University School of Computing Science Surrey, B.C., Canada ABSTRACT The context of our work is a project... in Alloy, and use the effi- cient...

80

Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993  

SciTech Connect (OSTI)

The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

Cannon, S.D.; Finch, S.M. [comps.

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Quarterly report for the NGA FFCA project, April 1, 1994--June 30, 1994  

SciTech Connect (OSTI)

Summaries of activities and agendas of meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project are presented. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities included collection and review of state work plans, coordination with the National Association of Attorneys General to identify areas of overlap in working on DOE issues related to environmental management, and the writing of task force meeting summaries for distribution.

NONE

1994-12-31T23:59:59.000Z

82

Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

NONE

1996-05-01T23:59:59.000Z

83

Quarterly report for the NGA FFCA project, July 1--September 30, 1994  

SciTech Connect (OSTI)

Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributed for review and comment.

NONE

1994-12-31T23:59:59.000Z

84

Basalt waste isolation project. Quarterly report, October 1, 1980-December 31, 1980  

SciTech Connect (OSTI)

In September 1977, the National Waste Terminal Storage Program was restructured to support investigations of two US DOE sites - Hanford and Nevada. The Basalt Waste Isolation Project within Rockwell Hanford Operations has been chartered with the responsibility of conducting these investigations. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration, geosciences, hydrology, engineered barriers, near-surface test facility, engineering testing, and repository studies. Summaries of major accomplishments for each of these areas are reported in this document.

Deju, R.A.

1981-02-01T23:59:59.000Z

85

Hot gas cleanup test facility for gasification and pressurized combustion project. Quarterly report, October--December 1995  

SciTech Connect (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDs) into the structural and process designs. Substantial progress in construction activities was achieved during this quarter.

NONE

1996-02-01T23:59:59.000Z

86

Deflagration-to-detonation transition project. Quarterly report, December 1979-February 1980  

SciTech Connect (OSTI)

Progress in a project on deflagration-to-detonation transition (DDT) is reported. The activities of this project pertain primarily to the development of small, safe, low-voltage, hot-wire detonators. Its major goals are: the formulation of a modeling capability for DDT of the explosive 2-(5-cyanotetrazolato)pentaamminecobalt (III) perchlorate (CP); the development of improved DDT materials; the establishment of a data base for corrosion, compatibility, and reliability of CP-loaded detonators; and the design and development of advanced DDT components. Information is included on materials development, component development, and compatibility studies encompassing the thermal and chemical stability of CP in contact with the component materials. (LCL)

Lieberman, M.L. (ed.) [ed.

1980-09-01T23:59:59.000Z

87

Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993  

SciTech Connect (OSTI)

Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

Lienau, P.

1993-06-01T23:59:59.000Z

88

Advanced Coal Conversion Process Demonstration Project. Quarterly technical progress report, January 1, 1994--March 31, 1994  

SciTech Connect (OSTI)

This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from January 1, 1994, through March 31, 1994. This project demonstrates an advanced, thermal, coal drying process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal{reg_sign} process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal processing, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. Rosebud SynCoal Partnership`s ACCP Demonstration Facility entered Phase III, Demonstration Operation, in April 1992 and operated in an extended startup mode through August 10, 1993, when the facility became commercial. Rosebud SynCoal Partnership instituted an aggressive program to overcome startup obstacles and now focuses on supplying product coal to customers. Significant accomplishments in the history of the SynCoal{reg_sign} process development are shown in Appendix A.

NONE

1996-02-01T23:59:59.000Z

89

Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion Project. Quarterly report, April--June 1996  

SciTech Connect (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived as streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed Include the integration of the particulate control devices into coal utilization systems, on-line cleaning, techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing, Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: 1 . Carbonizer/Pressurized Circulating, Fluidized Bed Gas Source; 2. Hot Gas Cleanup Units to mate to all gas streams; 3. Combustion Gas Turbine; 4. Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during, this reporting period was continuing, the detailed design of the FW portion of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDS) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter. Delivery and construction of the process structural steel is complete and the construction of steel for the coal preparation structure is complete.

NONE

1996-12-31T23:59:59.000Z

90

Deflagration-to-detonation transition project: quarterly report for the period September through November 1979  

SciTech Connect (OSTI)

The activities of the Sandia Laboratories project on deflagration-to-detonation transition (DDT) pertain primarily to the development of small, safe, low-voltage, hot-wire detonators. Its major goals are: the formulation of a modeling capability for DDT of the explosive 2-(5-cyanotetrazolato)pentaamminecobalt(III) perchlorate (CP); the development of improved DDT materials; the establishment of a data base for corrosion, compatibility, and reliability of CP-loaded detonators; and the design and development of advanced DDT components. Progress in this research is reported. The planned development of the MC3423 detonator has been completed and the final design review meeting has been held. Additional work must be performed to establish satisfactory output function. Ignition sensitivity data have also been obtained. Ignition and shock testing experiments for development of the MC3533 detonator have been planned. An initial version of the component will utilize available MC3423 headers, while the final design will incorporate a new header that has been designed and ordered. Detonator performance studies have been planned to optimize CP density-length factors. Feasibility studies on the MC3196A detonator have continued in an effort to obtain a reliable 50-200 ..mu..s function time.

Lieberman, M. L. [ed.

1980-07-01T23:59:59.000Z

91

MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990  

SciTech Connect (OSTI)

The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number_sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

Not Available

1992-01-01T23:59:59.000Z

92

Minnesota Agri Power Project. Quarterly report, July 1, 1997--September 30, 1997  

SciTech Connect (OSTI)

Program status and accomplishments for a project to develop alfalfa as a biomass fuel for power generation are summarized in this report. The main areas of reporting include: (1) alfalfa separation pilot plant testing, (2) design of gasification plant, (3) alfalfa leaf meal feeding trials and analysis, (4) integrated plant design and cost estimate, and (5) site plan construction and environmental permits. The alfalfa separation pilot plant fractionation equipment encountered operating problems from rocks and other tramp materials in the alfalfa bales. An investigation of techniques and equipment to remove the tramp materials resulted in the selection of a vibrating conveyor system. The Carbona gasification plant design basis and the Westinghouse scope of supply and design basis for the hot gas filter are provided in the report. The alfalfa leaf meal feeding trials showed that this economically critical co-product can be a viable livestock feed ingredient if favorable price, availability, and quality are maintained. The Stone and Webster basis of design for the integrated plant is included, and the basis for development of gas turbine performance runs is also detailed.

NONE

1997-10-01T23:59:59.000Z

93

LLNL underground coal gasification project. Quarterly progress report, January-March 1981  

SciTech Connect (OSTI)

We have continued our laboratory studies of forward gasification through drilled holes in small blocks of coal, approximately 1 foot on a side. Such studies give insight into cavity growth mechanisms and particulate production. However, because of the small dimensions involved, the information these tests provide is necessarily limited to aspects of cavity growth at very early times. The preliminary process design of the Tono No. 1 field experiment in Washington has been completed. The experimental plan and operational strategy have been developed to ensure that the injection point remains near the bottom of the coal seam and that the experiment continues at least until a period of stable operation has been reached and sustained for a time. We have continued to develop a mathematical model for the small coal block experiments in order to further our understanding of the physical and chemical processes governing the burning of the coal and the growth of the cavity within the block. This model will be adapted, later, to larger-scale coal block experiments, and finally to full-scale field experiments. We hope to obtain scaling laws and other insights from the model. Groundwater samples from wells located at distances of a few feet to several hundred feet from the gasification cavities were collected before, during, and after each of the Hoe Creek tests. The analysis of the groundwater contamination data pertinent to the Hoe Creek No. 3 test was completed. This is an ongoing project, and we will continue to obtain and analyze groundwater samples from these test sites.

Olness, D.U.; Clements, W. (eds.)

1981-04-27T23:59:59.000Z

94

SmartGrid: Quarterly Data Summaries from the Data Hub and SmartGrid Project Information (from OpenEI and SmartGrid.gov)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Both OpenEI and SmartGrid.gov are DOE portals to a wealth of information about the federal initiatives that support the development of the technologies, policies and projects transforming the electric power industry. Projects funded through the U.S. Recovery Act are organized by type and pinned to an interactive map at http://en.openei.org/wiki/Gateway:Smart_Grid. Each project title links to more detailed information. The Quarterly Data Summaries from the Data Hub at SmartGrid.gov are also available on OpenEI at http://en.openei.org/datasets/node/928. In addition, the SmartGrid Information Center contains documents and reports that can be searched or browsed. Smart Grid Resources introduces international SmartGrid programs and sites, while OpenEI encourages users to add SmartGrid information to the repository.

95

Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993  

SciTech Connect (OSTI)

Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

Not Available

1994-03-01T23:59:59.000Z

96

A quarterly and Central  

E-Print Network [OSTI]

A quarterly report on employment and office markets in Northern and Central New Jersey May 2008- plications for the state's office markets. This year has every indication of being a very difficult capacity. Along with the ongoing Portfields Initiative project, the Port of New York and New Jersey

97

Phase 2 of the array automated assembly task for the Low Cost Silicon Solar Array Project. Seventh quarterly report  

SciTech Connect (OSTI)

Work during this quarter emphasized the evaluation of the Motorola metallization process, the major experimental task of the program. The Motorola process is a lengthy one, designed to assure reproducible metallization of solar cells, but it was found difficult to reproduce relative to a single step electroless nickel plating. It is also concluded, on the basis of experiments performed to date, that the product of the Motorola process is virtually identical to the product of a simple electroless nickel plating process.

Petersen, R.C.

1980-07-01T23:59:59.000Z

98

Quarterly Construction Status Report Period Ending: June 30, 2013  

E-Print Network [OSTI]

Quarterly Construction Status Report Period Ending: June 30, 2013 Storrs and Regional Campuses University of Connecticut Health Center Quarterly Construction Status Report for Period Ending: June 30, 2013 #12;Quarterly Construction Status Report Period Ending: June 30, 2013 Project Number Project Index

Alpay, S. Pamir

99

Quarterly Construction Status Report Period Ending: March 31, 2014  

E-Print Network [OSTI]

Quarterly Construction Status Report Period Ending: March 31, 2014 Storrs and Regional Campuses University of Connecticut Health Center Quarterly Construction Status Report for Period Ending: March 31, 2014 #12;Quarterly Construction Status Report Period Ending: March 31, 2014 Project Number Project

Alpay, S. Pamir

100

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994  

SciTech Connect (OSTI)

This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

NONE

1995-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

LLL in situ coal gasification project. Quarterly progress report, October-December 1979. [Hoe Creek No. 3 and planning  

SciTech Connect (OSTI)

The major effort this quarter has been postexperiment analysis of Hoe Creek No. 3 and planning for future gasification experiments. Hoe Creek No. 3: Thermal data have been analyzed to determine the performance of the drilled horizontal channel during forward gasification. Thermal and material balance data are combined to determine late-time burn boundaries for the experiment. Surface subsidence after the experiment was completed is described. Process wells were inspected to determine failure characteristics and pinpoint late-time injection location. Ground-water quality before and after Hoe Creek No. 3 and the effects of aquifer interconnection on hydraulic measurements at the Hoe Creek No. 2 and No. 3 sites are discussed. Future experiments: Potential UCG sites are being characterized for future tests. Two sites in the Powder River Basin near Gillette, Wyoming are discussed. Preliminary plans for a deep site gasification experiment and a new method for in situ gasification of thick seams are presented.

Cena, R.J.; Strack, B.S. (eds.)

1980-04-23T23:59:59.000Z

102

Strategic Petroleum Reserve quarterly report  

SciTech Connect (OSTI)

The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current storage capacity and ullage available; current status of the Strategic Petroleum Reserve storage facilities, major projects and the acquisition of petroleum products; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

NONE

1995-11-15T23:59:59.000Z

103

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995  

SciTech Connect (OSTI)

Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

NONE

1996-08-01T23:59:59.000Z

104

Distinguished Achievements of a Quarter-Century Operation and a Promising Project Named MK-III in JOYO  

SciTech Connect (OSTI)

The experimental fast reactor JOYO at the O-arai Engineering Center of the Japan Nuclear Cycle Development Institute is the first liquid sodium fast reactor in Japan. The purpose of constructing JOYO was to obtain technical information about liquid-metal fast breeder reactors (LMFBRs) through experience with their design, construction, and operation and to use the reactor as a fast neutron irradiation facility for the development of fuels, materials, and other components required for the LMFBR program. Through design, construction, testing, operation, and maintenance experience, JOYO has contributed much to the LMFBR development program. In addition to providing operating experience, many kinds of irradiation tests have been conducted for the development of fuels and materials under the conditions of higher fast neutron flux and temperature than those in light water reactors. JOYO has been operated successfully for a quarter-century without any serious problem, and this operation demonstrated the safety and reliability of the sodium-cooled fast reactor.The reactor has just been upgraded to the MK-III core to increase irradiation capability for playing a greater role in providing an irradiation field as a fast reactor. Given the worldwide trend of fast reactor shutdowns, JOYO is an increasingly valuable world resource for current and future reactor development.

Maeda, Yukimoto; Aoyama, Takafumi; Odo, Toshihiro; Nakai, Satoru; Suzuki, Soju [Japan Nuclear Cycle Development Institute (Japan)

2005-04-15T23:59:59.000Z

105

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996  

SciTech Connect (OSTI)

Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

NONE

1997-05-01T23:59:59.000Z

106

Microsoft Word - Quarterly_report_Oct_Dec_2013.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The UGS project website was updated with new information - http:geology.utah.govempshaleoil The PI completed the fourth quarterly report and emailed it to all...

107

Microsoft Word - Quarterly_report_Jul_Sep_2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The UGS project website was updated with new information - http:geology.utah.govempshaleoil The PI completed the third quarterly report and emailed it to all interested...

108

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

109

Strategic Petroleum Reserve. Quarterly report  

SciTech Connect (OSTI)

The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated. Samples of the oil revealed two problems that, although readily correctable, have reduced the availability of some of the oil inventory for drawdown in the near-term. These problems are: (1) a higher-than-normal gas content in some of the crude oil, apparently from years of intrusion of methane form the surrounding salt formation; and (2) elevated temperatures of some of the crude oil, due to geothermal heating, that has increased the vapor pressure of the oil. Investigations are proceeding to determine the extent to which gas intrusion and geothermal heating are impacting the availability of oil for drawdown. Preliminary designs have been developed for systems to mitigate both problems.

Not Available

1993-11-15T23:59:59.000Z

110

Quarterly environmental data summary for first quarter 1998  

SciTech Connect (OSTI)

In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the first quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base, and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined {open_quotes}above normal{close_quotes} Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES&H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in the event that {open_quotes}above normal{close_quotes} data occur. All data received and verified during the first quarter were within a permissible range of variability except for those detailed below. Above normal occurrences are cited for groundwater, air, and NPDES data. There were none for springs or surface water. The following discussion offers a brief summary of the data merged during the first quarter that exceeded the above normal criteria and updates on past reported above normal data. The attached tables present the most recent data for air and the data merged into the data base during the first quarter 1998 for groundwater, NPDES, surface water, and springs. Graphs showing concentrations of selected contaminants of concern at some of the critical locations have also been included in this QEDS. The graphs are discussed in the separate sections.

NONE

1998-05-01T23:59:59.000Z

111

Quarterly environmental data summary for fourth quarter 1997  

SciTech Connect (OSTI)

The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.

NONE

1997-12-31T23:59:59.000Z

112

Quarterly Progress Report  

Broader source: Energy.gov [DOE]

Quarterly Progress Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

113

Peat gasification pilot plant program. Project 70105 quarterly report No. 1, October 1, 1980-August 31, 1981  

SciTech Connect (OSTI)

Over 200 peat gasification tests were conducted in laboratory-scale and PDU-scale (process development unit) equipment since 1976. A kinetic model for peat gasification was developed from laboratory and PDU data. The encouraging results of these tests and the model projections show that on the basis of its chemistry and kinetics, peat is an excellent raw material for commercial synthetic natural gas (SNG) production. To further advance peat gasification technology, DOE and GRI initiated a pilot-plant-scale program using an existing coal gasification pilot plant. This facility was adapted to peat processing and can convert 50 tons of peat to about 0.5 million standard cubic feet of SNG daily. The pilot plant is described in Appendix A. Only three major pieces of equipment - a peat dryer, a grinder, and a screener - were required to prepare the pilot plant for peat processing. This modification phase was completed in the winter of 1980-1981. After a number of drying, grinding, and screening tests, peat was first fed to the gasifier in April 1981, initiating the pilot plant studies to develop the PEATGAS process. Since that time, the gasification of Minnesota peat by the PEATGAS process has been successfully demonstrated in a series of gasification tests. This report covers the work done between October 1, 1980, and August 31, 1981, under DOE Contract No. AC01-80ET14688.

Not Available

1982-09-01T23:59:59.000Z

114

Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992  

SciTech Connect (OSTI)

Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

Not Available

1993-12-01T23:59:59.000Z

115

Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992  

SciTech Connect (OSTI)

Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

Not Available

1993-09-01T23:59:59.000Z

116

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994  

SciTech Connect (OSTI)

This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

NONE

1995-11-01T23:59:59.000Z

117

Contracts for field projects and supporting research on enhanced oil recovery. Quarterly technical progress report, October 1994--December 1994. Progress review No. 81  

SciTech Connect (OSTI)

This document consists of a publications list for field projects and brief descriptions of research projects on enhanced petroleum recovery.

NONE

1996-03-01T23:59:59.000Z

118

Synthetic fuels from US oil shales: a technical and economic verification of the HYTORT Process. Project 61040 quarterly report, April 1-June 30, 1980  

SciTech Connect (OSTI)

Progress is reported on the HYTORT Process development work conducted from April 1 through June 30, 1980. Thermobalance tests have been conducted on samples of shale from each large multiton sample prior to large-scale tests and these test results have been fit with specific kinetic expressions. Approximately 80% of the instrumentation for the laboratory-scale reactor has been received. Fabrication of the reactor, feed hopper, and residue receiver is about 95% complete. Two successful moving-bed tests were conducted in the bench-scale reactor during this quarter. A large, 50-ton sample of the Lower Huron member of the Ohio Shale was mined and readied for shipment to IGT. Modification of the bench-scale steam-oxygen unit was completed. Spent shale from PDU tests was prepared for use in these tests. A set of five screening runs on New Albany shale oil and a set of four screening runs on Sunbury shale oil were conducted during this quarter. The nitrogen content of these oils was reduced to the 0.16 to 0.30 weight percent range in the bench-scale hydrotreating unit. Design of the laboratory test system for mist-size control studies was completed. Methods are being studied for measuring mist particle size. Shakedown and initial testing of the liquid-sealed lockhopper were performed during this quarter. Two runs were made in the PDU with Kentucky shales using a sample of the Cleveland member of the Ohio shale and a sample of New Albany shale. Samples for environmental analysis were taken during the PDU runs discussed above. On-line sampling equipment was installed prior to the PDU run with New Albany shale and samples were taken of the Stage 2 raw product gases.

None

1980-11-01T23:59:59.000Z

119

Quarterly coal report  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1995 and aggregated quarterly historical data for 1987 through the third quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

Young, P.

1996-05-01T23:59:59.000Z

120

Microsoft Word - Quarterly_report_Jan_Mar_2014f.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The UGS project website was updated with new information - http:geology.utah.govempshaleoil The PI completed the fifth quarterly report and emailed it to all interested...

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 13  

SciTech Connect (OSTI)

This thirteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of December 2005, and covers activities in the thirteenth project quarter, October 2005 ? December 2005.

Tim Richter

2006-03-23T23:59:59.000Z

122

Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 10  

SciTech Connect (OSTI)

This tenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-2002AL68080 presents the project status at the end of March 2005, and covers activities in the tenth project quarter, January-March 2005.

Tim Richter

2005-05-05T23:59:59.000Z

123

Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 9  

SciTech Connect (OSTI)

This ninth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DEFC04- 2002AL68080 presents the project status at the end of December 2004, and covers activities in the ninth project quarter, October - December 2004.

Tim Richter

2005-03-02T23:59:59.000Z

124

Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 18  

SciTech Connect (OSTI)

This eighteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of March 2007, and covers activities in the eighteenth project quarter, January 2007 – March 2007.

Tim Richter

2007-03-31T23:59:59.000Z

125

Directives Quarterly Updates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

126

Bachelors Enlisted Quarters Shipboard Sailors Ashore Phase I  

High Performance Buildings Database

Norfolk, VA Phase one of the quarters will house 1000 sailors. The completed three-phase project will house 3000 sailors in a campus environment. Future phases will include additional housing, outdoor athletic areas, and a central community center.

127

Strategic Petroleum Reserve quarterly report  

SciTech Connect (OSTI)

This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

Not Available

1991-08-15T23:59:59.000Z

128

Lessons Learned Quarterly Report, December 1995  

Broader source: Energy.gov [DOE]

This quarterly report summarizes the lessons learned for documents completed between July 1 and September 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs.

129

Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994  

SciTech Connect (OSTI)

Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

Abdelghani, A.

1994-06-01T23:59:59.000Z

130

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1999  

Broader source: Energy.gov (indexed) [DOE]

Updates ... 10 q Executive Order Issued on Invasive Species ... 11 q Documents Issued First Quarter FY...

131

Contracts for field projects and supporting research on enhanced oil recovery. Quarterly progress review No. 85, October 1, 1995--December 31, 1995  

SciTech Connect (OSTI)

This documents presents progress on enhanced oil recovery programs and reservoir characterization programs. Information is presented on contract numbers, awards, investigators, and project managers.

Godley, P.; Waisley, S.

1996-12-01T23:59:59.000Z

132

BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980  

SciTech Connect (OSTI)

During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

Dougan, P.M.

1980-03-20T23:59:59.000Z

133

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995  

SciTech Connect (OSTI)

This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

NONE

1996-06-01T23:59:59.000Z

134

STANFORD GEOTHERMAL QUARTERLY REPORT  

E-Print Network [OSTI]

STANFORD GEOTHERMAL PROGRAM QUARTERLY REPORT OCTOBER 1 ­ DECEMBER 31, 1996 #12;1 1 AN EXPERIMENTAL that in the vertical case. 1.2 INTRODUCTION The process of boiling in porous media is of significance in geothermal

Stanford University

135

STANFORD GEOTHERMAL QUARTERLY REPORT  

E-Print Network [OSTI]

1 STANFORD GEOTHERMAL PROGRAM QUARTERLY REPORT JANUARY 1 - MARCH 31, 1997 #12;2 1 AN EXPERIMENTAL in geothermal systems as well as in many other applications such as porous heat pipes, drying and nuclear waste

Stanford University

136

Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 11, DOE/AL68080-TSR11  

SciTech Connect (OSTI)

This eleventh quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2005, and covers activities in the eleventh project quarter, April 2005-June 2005.

Tim Richter

2005-09-26T23:59:59.000Z

137

Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 19, DOE/AL68080-TSR19  

SciTech Connect (OSTI)

This nineteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2007, and covers activities in the nineteenth project quarter, April 2007 – June 2007.

Tim Richter

2007-06-30T23:59:59.000Z

138

Tennessee Energy Statistics Quarterly. Second quarter 1984  

SciTech Connect (OSTI)

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity. The Tennessee Energy Statistics Quarterly has been developed by the Tennessee Energy Data Base Program to serve as a supplement to the Energy Division publication - The Tennessee Energy Profiles: 1960-1980. Historical data reported in this volume cover the production and utilization of major energy supplies by fuel type and economic sectors, as well as other energy data such as prices and fuel distribution. 12 figures, 12 tables.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1985-01-01T23:59:59.000Z

139

A Novel Approach to Material Development for Advanced Reactor Systems. Quarterly progress report, Year 1 - Quarter 2  

SciTech Connect (OSTI)

OAK B188 A Novel Approach to Material Development for Advanced Reactor Systems. Quarterly progress report, Year 1--Quarter 2. Year one of this project had three major goals. First, to specify, order and install a new high current ion source for more rapid and stable proton irradiation. Second, to assess the use low temperature irradiation and chromium pre-enrichment in an effort to isolate a radiation damage microstructure in stainless steels without the effects of RIS. Third, to prepare for the irradiation of reactor pressure vessel steel and Zircaloy. Program goals for Second Quarter, Year One: In year 1 quarter 2, the project goal was to complete an irradiation of an RPV steel sample and begin sample characterization. We also planned to identify sources of Zircaloy for irradiation and characterization.

None

2000-03-27T23:59:59.000Z

140

EMSL Quarterly Highlights Report: 1st Quarter, FY08  

SciTech Connect (OSTI)

The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

Showalter, Mary Ann

2008-01-28T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009  

SciTech Connect (OSTI)

The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

2009-02-02T23:59:59.000Z

142

EMSL Quarterly Highlights Report: FY09, 4th Quarter  

SciTech Connect (OSTI)

This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

2009-10-21T23:59:59.000Z

143

EMSL Quarterly Highlights Report: FY09, 3rd Quarter  

SciTech Connect (OSTI)

This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

2009-07-17T23:59:59.000Z

144

Lessons Learned Quarterly Report, September 1995  

Broader source: Energy.gov [DOE]

This quarterly report summarizes the lessons learned for documents completed between April 1 and June 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs. The report includes a Question and Answer section as well as guidance on selected topics.

145

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991  

SciTech Connect (OSTI)

The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

1992-02-01T23:59:59.000Z

146

Integrated low emission cleanup system for direct coal-fueled turbines (electrostatic agglomeration). Project quarterly report, January 1, 1992--March 31, 1992  

SciTech Connect (OSTI)

The objective of this contract is to investigate the removal of SO{sub x} and particulate matter from direct coal-fired combustion gas streams at high temperature and high pressure conditions. This investigation will be accomplished through a bench-scale testing and evaluation program employing sorbent mixed with a coal-water slurry for SO{sub x} removal, and an innovative particulate control concept. The particulate control device utilizes electrostatic agglomeration followed by a high efficiency mechanical collector (cyclone). The process goal is to achieve particulate collection efficiency better than that required by the 1979 new source performance standards. An additional goal is to demonstrate 70% SO{sub x} removal efficiency. This research project is now in the second of a 3 phase (phase II) project. Phase II is to fabricate the combustor and particulate control devices and install the system at a test facility located at Research-Cottrell`s, KVB Western Laboratory, Santa Ana, CA. There are three functional categories, or tasks which are to be completed in sequence. These tasks are itemized as follows: design, procurement, and installation, shakedown and startup, and reporting.

Quimby, J.M.

1992-05-01T23:59:59.000Z

147

Integrated low emission cleanup system for direct coal-fueled turbines (electrostatic agglomeration). Project quarterly report, September 1, 1991--December 31, 1991  

SciTech Connect (OSTI)

The objective of this contract is to investigate the removal of SO{sub x} and particulate matter from direct coal-fired combustion gas streams at high temperature and high pressure conditions. This investigation will be accomplished through a bench-scale testing and evaluation program employing sorbent mixed with a coal-water slurry for SO{sub x} removal, and an innovative particulate control concept. The particulate control device utilizes electrostatic agglomeration followed by a high efficiency mechanical collector (cyclone). The process goal is to achieve particulate collection efficiency better than that required by the 1979 new source performance standards. An additional goal is to demonstrate 70% SO{sub x} removal efficiency. This research project is now in the second of a 3 phase (Phase II) project. Phase II is to fabricate the combustor and particulate control devices and install the system at a test facility located at Research-Cottrell`s, KVB Western Laboratory, Santa Ana, CA. There are three functional categories, or tasks which are to be completed in sequence. These tasks are itemized as follows: Design, procurement, and installation; Shakedown and startup; Reporting. Attempts to validate the concept of electrostatic agglomeration were not possible in the shakedown program before budget constraints halted the program. What was learned was that electrostatic precipitation is feasible in the temperature range of 1600--1800{degrees}F and at pressures above 10 atmospheres.

Quimby, J.M.

1992-02-01T23:59:59.000Z

148

Independent Oversight Review, West Valley Demonstration Project...  

Office of Environmental Management (EM)

West Valley Demonstration Project - December 2014 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report EA-1552: Final Environmental Assessment...

149

Water Reactor Safety Research Division quarterly progress report, January 1-March 31, 1980  

SciTech Connect (OSTI)

The Water Reactor Safety Research Programs Quarterly Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: LWR Thermal Hydraulic Development, Advanced Code Evaluation, TRAC Code Assessment, and Stress Corrosion Cracking of PWR Steam Generator Tubing.

Romano, A.J. (comp.)

1980-06-01T23:59:59.000Z

150

Water Reactor Safety Research Division. Quarterly progress report, April 1-June 30, 1980  

SciTech Connect (OSTI)

The Water Reactor Safety Research Programs quarterly report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: LWR Thermal Hydraulic Development, Advanced Code Evlauation, TRAC Code Assessment, and Stress Corrosion Cracking of PWR Steam Generator Tubing.

Abuaf, N.; Levine, M.M.; Saha, P.; van Rooyen, D.

1980-08-01T23:59:59.000Z

151

Advanced Reactor Safety Research Division. Quarterly progress report, January 1-March 31, 1980  

SciTech Connect (OSTI)

The Advanced Reactor Safety Research Programs quarterly progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

Agrawal, A.K.; Cerbone, R.J.; Sastre, C.

1980-06-01T23:59:59.000Z

152

Advanced Reactor Safety Research Division quarterly progress report, January 1-March 31, 1981  

SciTech Connect (OSTI)

The Advanced Reactor Safety Research Programs Quarterly Progress Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

Cerbone, R.J.; Ginsberg, T.; Guppy, J.G.; Sastre, C.

1981-05-01T23:59:59.000Z

153

Advanced Reactor Safety Research Division. Quarterly progress report, July 1-September 30, 1980  

SciTech Connect (OSTI)

The Advanced Reactor Safety Research Programs Quarterly Progress Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

Ramano, A.J. (comp.)

1980-11-01T23:59:59.000Z

154

Advanced Reactor Safety Research Division quarterly progress report, 1 October-31 December 1980  

SciTech Connect (OSTI)

The Advanced Reactor Safety Research Programs quarterly progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, LMFBR Safety Experiments, SSC Code Development, and Fast Reactor Safety Code Validation.

Cerbone, R.J.; Ginsberg, T.; Guppy, J.G.; Sastre, C.

1981-02-01T23:59:59.000Z

155

Advanced Reactor Safety Research Division. Quarterly progress report, July 1-September 30, 1979  

SciTech Connect (OSTI)

The Advanced Reactor Safety Research Programs Quarterly Progress Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

Romano, A.J.

1980-01-01T23:59:59.000Z

156

Water Reactor Safety Research Division. Quarterly progress report, October 1-December 31, 1980  

SciTech Connect (OSTI)

The Water Reactor Safety Research Programs Quarterly Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: Stress Corrosion Cracking of PWR Steam Generator Tubing, Advanced Code Evaluation, Simulator Improvement Program, and LWR Assessment and Application.

Cerbone, R.J.; Saha, P.; van Rooyen, D.

1981-02-01T23:59:59.000Z

157

Advanced Reactor Safety Research Division. Quarterly progress report, April 1-June 30, 1980  

SciTech Connect (OSTI)

The Advanced Reactor Safety Research Programs Quarterly Progress Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR safety evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

Romano, A.J.

1980-01-01T23:59:59.000Z

158

EMSL Quarterly Highlights Report: 2nd Quarter, Fiscal Year 2009  

SciTech Connect (OSTI)

This report outlines the highlights, staff and user accomplishments, and publications that occured during FY09, 2nd quarter at EMSL.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

2009-05-04T23:59:59.000Z

159

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010  

SciTech Connect (OSTI)

This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

2010-02-04T23:59:59.000Z

160

Strategic Petroleum Reserve quarterly report  

SciTech Connect (OSTI)

The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

Not Available

1990-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Environmental Biosciences Program Quarterly Report  

SciTech Connect (OSTI)

Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River Site (SRS). This project will be incorporated into the ongoing project on Population Health Risks in the Vicinity of the Savannah River Site. During a meeting at the SRS on October 21, 2008, a presentation was made on EBP participation in the development and operation of an Epidemiology Consortium at the SRS. A follow-up meeting with SRS officials is planned for 29 and 30 January 2009 at Medical University of South Carolina (MUSC).An epidemiology project on population health risk assessment is being conducted to assess health risks among populations in the vicinity of the SRS. This project is using the capabilities of the EBP GIS for the geographical assessment of cancer and non-cancer disease rates, as well as the potential association of population health risks with environmental exposures. Although funding uncertainties have slowed progress on some aspects of this project, it has not been necessary to restructure the performance schedule to date.

Lawrence C. Mohr, M.D.

2009-01-30T23:59:59.000Z

162

Quarterly Cybersecurity Awareness Campaigns and Toolkits | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quarterly Cybersecurity Awareness Campaigns and Toolkits Quarterly Cybersecurity Awareness Campaigns and Toolkits The OCIO coordinates a variety of internal cybersecurity awareness...

163

Low-rank coal research. Quarterly technical progress report, April-June 1984  

SciTech Connect (OSTI)

Papers in the quarterly technical progress report for the period April-June, 1984, of the Low-Rank Coal Research project have been entered individually into EDB and ERA (17 items). (LTN)

Not Available

1984-08-01T23:59:59.000Z

164

CX-010738: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

165

CX-010164: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration

166

QUARTERLY PROGRESS REPORT April 1, 2001 -June 30, 2001  

E-Print Network [OSTI]

(Table 1) and to better evaluate best management practices (BMPs) for shooting ranges, additional soil with soil Pb concentrations, and a considerable amount of lead was transported into the aboveground parts. 71 QUARTERLY PROGRESS REPORT April 1, 2001 - June 30, 2001 PROJECT TITLE: Environmental Impacts

Ma, Lena

167

Genepool Quarterly Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky Learning Fun withGenepool Quarterly MaintenanceGenepool

168

Coal liquefaction process research quarterly report, October-December 1979  

SciTech Connect (OSTI)

This quarterly report summarizes the activities of Sandia's continuing program in coal liquefaction process research. The overall objectives are to: (1) provide a fundamental understanding of the chemistry of coal liquefaction; (2) determine the role of catalysts in coal liquefaction; and (3) determine the mechanism(s) of catalyst deactivation. The program is composed of three major projects: short-contact-time coal liquefaction, mineral effects, and catalyst studies. These projects are interdependent and overlap significantly.

Bickel, T.C.; Curlee, R.M.; Granoff, B.; Stohl, F.V.; Thomas, M.G.

1980-03-01T23:59:59.000Z

169

Quarterly coal report, July--September 1997  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

NONE

1998-02-01T23:59:59.000Z

170

Strategic Petroleum Reserve quarterly report  

SciTech Connect (OSTI)

The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on activities undertaken with respect to the Strategic Petroleum Reserve. Since the Strategic Petroleum Reserve crude oil storage facilities program for the 750 million barrels was completed in 1991, this November 15, 1992, Strategic Petroleum Reserve Quarterly Report focuses on activities related primarily to the status of storage facilities, oil acquisition, budget and costs of the Reserve during the period July 1, 1992, through September 30, 1992.

Not Available

1992-11-15T23:59:59.000Z

171

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984  

SciTech Connect (OSTI)

At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

None

1984-01-01T23:59:59.000Z

172

Quarterly coal report, April--June 1997  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

NONE

1997-11-01T23:59:59.000Z

173

Quarterly coal report, July--September 1998  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1998 and aggregated quarterly historical data for 1992 through the second quarter of 1998. 58 tabs.

NONE

1999-02-01T23:59:59.000Z

174

EDIN-USVI Clean Energy Quarterly: Volume 1, Issue 3, September 2011 (Newsletter)  

SciTech Connect (OSTI)

This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations-U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and project-related renewable energy and energy efficiency educational outreach and technology deployment efforts.

Not Available

2011-09-01T23:59:59.000Z

175

EDIN-USVI Clean Energy Quarterly: Volume 2, Issue 1, June 2012 (Newsletter)  

SciTech Connect (OSTI)

This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations-U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the working groups, and project-related technology deployment efforts.

Not Available

2012-06-01T23:59:59.000Z

176

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission. Second Quarter 1984  

SciTech Connect (OSTI)

At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 334, with total estimated nominal capacity of 2,876 MW. Of these totals, 232 projects, capable of producing 678 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration projects had signed 80 contracts with a potential of 1,161 MW. Thirty-three contracts had been signed for solid waste/biomass projects for a total of 298 MW. In total, 118 contracts and letter agreements had been signed with cogeneration, solid waste, and biomass projects capable of producing 1,545 MW. PG and E also had under active discussion 46 cogeneration projects that could generate a total of 688 MW to 770 MW, and 13 solid waste or biomass projects with a potential of 119 MW to 139 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. Two geothermal projects were under active discussion for a total of 2 MW. There were 8 solar projects with signed contracts and a potential of 37 MW, as well as 4 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 34, with a generating capability of 1,042 MW, Also, discussions were being conducted with 23 wind farm projects, totaling 597 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 7 other small wind projects under active discussion. There were 71 hydroelectric projects with signed contracts and a potential of 151 MW, as well as 76 projects under active discussion for 505 MW. In addition, there were 18 hydroelectric projects, with a nominal capacity of 193 MW, that PG and E was planning to construct. Table B displays the above information. Appendix A displays in tabular form the status reports of the projects as of June 30, 1984.

None

1984-01-01T23:59:59.000Z

177

Quarterly coal report, October--December 1996  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1996 and aggregated quarterly historical data for 1990 through the third quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 72 tabs.

NONE

1997-05-01T23:59:59.000Z

178

Quarterly Technical Progress Report  

SciTech Connect (OSTI)

This project has identified all FDD oil reservoirs in Oklahoma; grouped those reservoirs into plays that have similar depositional origins; collected, organized, and analyzed all available data; conducted characterization and simulation studies on selected reservoirs in each plays; and implemented a technology transfer program targeted to the operators of FDD reservoirs. By fulfilling these objectives, the FDD project has had the goal of helping to sustain the life expectancy of existing wells and provide incentive for development and exploratory wells with the ultimate objective of increasing oil recovery.

Mary K. Banken

1998-06-30T23:59:59.000Z

179

Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly progress report, July 1, 1995--September 30, 1995  

SciTech Connect (OSTI)

This report is the quarterly progress report for July through September 1995 for work done by Tulane and Xavier Universities under DOE contract number DE-FG01-93-EW53023. Accomplishments for various tasks including administrative activities, collaborative cluster projects, education projects, initiation projects, coordinated instrumentation facility, and an investigators` retreat are detailed in the report.

NONE

1995-12-01T23:59:59.000Z

180

Liquid fossil-fuel technology. Quarterly technical progress report, January-March 1983  

SciTech Connect (OSTI)

Accomplishments for the quarter ending March 1983 are presented under the following headings: liquid fossil fuel cycle, processing, utilization, and project integration and technology transfer. Feature articles for this quarter are: (1) abandoned oil field reports issued; (2) oilfield water data bank report published; (3) microbial enhanced recovery report issued; (4) polymer-augmented project could be economic today; (5) carbon dioxide EOR estimates given; (6) BETC passes 65th milestone; and (7) fifty achievements for fifty years (1918-1968). BETC publications are also listed. (ATT)

Linville, B. (ed.)

1983-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Quarterly report of RCRA groundwater monitoring data for period July 1--September 30, 1995  

SciTech Connect (OSTI)

Nineteen RCRA groundwater monitoring projects are conducted at the Hanford site. They include treatment, storage, and disposal facilities for both solid and liquid waste. Groundwater monitoring programs described in this report comply with the interim- and final- status federal and state regulations. The RCRA projects are monitored under one of the following programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment or detection. This quarterly report contains data received between July 1 and Sept. 30, 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the July-Sept. quarter, but also data from earlier sampling events not previously reported.

NONE

1996-01-01T23:59:59.000Z

182

Short-rotation woody-crops program. Quarterly progress report for period ending August 31, 1981  

SciTech Connect (OSTI)

Progress of twenty-one projects in the Short Rotation Woody Crops Program is summarized for the period June 1 through August 31, 1981. Individual quarterly reports included from each of the projects discuss accomplishments within specific project objectives and identify recent papers and publications resulting from the research. The major program activities are species screening and genetic selection, stand establishment and cultural treatment, and harvest, collection, transportation, and storage.

Cushman, J.H.; Ranney, J.W.

1982-04-01T23:59:59.000Z

183

FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report  

SciTech Connect (OSTI)

This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-10-01T23:59:59.000Z

184

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect (OSTI)

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

185

Quarterly coal report, October--December 1994  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1994 and aggregated quarterly historical data for 1986 through the third quarter of 1994. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

NONE

1995-05-23T23:59:59.000Z

186

Quarterly coal report, January--March 1994  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1994 and aggregated quarterly historical data for 1986 through the fourth quarter of 1993. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

Not Available

1994-08-24T23:59:59.000Z

187

Quarterly coal report, January--March 1995  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1995 and aggregated quarterly historical data for 1987 through the fourth quarter of 1994. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

NONE

1995-08-24T23:59:59.000Z

188

Quarterly coal report, January--March 1997  

SciTech Connect (OSTI)

This Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience,including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1997 and aggregated quarterly historical data for 1991 through the fourth quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

NONE

1997-08-01T23:59:59.000Z

189

Quarterly coal report, October--December 1997  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities. This report presents detailed quarterly data for october through December 1997 and aggregated quarterly historical data for 1991 through the third quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data, as specified in Section 202 of the energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

NONE

1998-05-01T23:59:59.000Z

190

Lessons Learned Quarterly Report Archive | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 1, 2002 Lessons Learned Quarterly Report, March 2002 Welcome to the 30th quarterly report on lessons learned in the NEPA process. December 5, 2001 Lessons Learned Quarterly...

191

Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report. Second quarter 1995  

SciTech Connect (OSTI)

During second quarter 1995, samples from seven new AMB groundwater monitoring wells at the Metallurgical Laboratory Hazardous Waste Management Facility (Met Lab HWMF) were analyzed for a comprehensive list of constituents. Two parameters exceeded standards during the quarter. Lead and nickel appear to exceed final Primary Drinking Water Standards (PDWS) in AMB-18A. These data were suspect and a rerun of the samples showed levels below flagging criteria. This data will be monitored in 3Q95. Aluminum, iron, manganese, boron, silver and total organic halogens exceeded Flag 2 criteria in at least one well each during second quarter 1995. This data, as well, will be confirmed by 3Q95 testing. Groundwater flow directions in the M-Area Aquifer Zone were similar to previous quarters; the flow rate estimate, however, differs because of an error noted in the scales of measurements used for previous estimates. The estimate was 470 ft/year during second quarter 1995. Reliable estimates of flow directions and rates in the Upper Lost Lake Aquifer Zone could not be determined in previous quarters because data were insufficient. The first estimate from second quarter 1995 shows a 530 ft/year rate. Reliable estimates of flow directions and rates in the Lower Lost Lake Aquifer Zone and in the Middle Sand Aquifer Zone of the CBCU could not be calculated because of the low horizontal gradient and the near-linear distribution of the monitoring wells. During second quarter 1994, SRS received South Carolina Department of Health and Environmental Control approval for constructing five point-of-compliance wells and two plume definition wells near the Met Lab HWMF. This project began in July 1994 and was completed in March of this year. Analytical data from these wells are presented in this report for the first time.

Chase, J.A.

1995-09-01T23:59:59.000Z

192

Lessons Learned Quarterly Report, September 1999  

Broader source: Energy.gov [DOE]

Welcome to the 20th Quarterly Report on lessons learned in the NEPA process. This issue includes a cumulative index for the past five years.

193

Lessons Learned Quarterly Report, June 2003  

Broader source: Energy.gov [DOE]

Welcome to the 35th quarterly report on lessons learned in the NEPA process. We are pleased to include in this issue three new mini-guidance articles.

194

Quarterly coal report, January--March 1996  

SciTech Connect (OSTI)

This report presents detailed quarterly data for March 1996 and historical data for 1988 through 1995 on coal production, distribution, imports and exports, prices, consumption, and stocks.

NONE

1996-08-01T23:59:59.000Z

195

Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

Jungers, D.K.

1993-10-01T23:59:59.000Z

196

SciTech Connect: QUARTERLY SUMMARY RESEARCH REPORT IN METALLURGY...  

Office of Scientific and Technical Information (OSTI)

QUARTERLY SUMMARY RESEARCH REPORT IN METALLURGY FOR JANUARY, FEBRUARY, AND MARCH 1954 Citation Details In-Document Search Title: QUARTERLY SUMMARY RESEARCH REPORT IN METALLURGY FOR...

197

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Broader source: Energy.gov (indexed) [DOE]

feraci.pdf More Documents & Publications Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May...

198

Quarterly Biomass Program/Clean Cities States Web Conference...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Presentation from the...

199

Assessment of research directions for high voltage direct current power systems. Quarterly technical progress report, October 1, 1980-December 31, 1980  

SciTech Connect (OSTI)

Activities during this quarterly period on proposed HVDC systems research are reported. These activities include studies of HVDC converters, computerized simulation of HVDC systems, circuit breakers, and long-range planning of HVDC projects. (LCL)

Long, W F

1981-01-01T23:59:59.000Z

200

Develop the dual fuel conversion system for high output, medium speed diesel engines. Quarterly report number 1, September 1--December 31, 1996  

SciTech Connect (OSTI)

Energy Conversions Incorporated has made substantial progress on the EMD-710 dual-fuel test cell in the first quarter of the project. The project is on schedule and has not met with any major roadblocks that would derail the planned timetable. Please note that much of the work done started before the funding arrived, and therefore those items are not included in the financial expenditures for the quarter.

NONE

1997-01-08T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Nuclear materials stabilization and packaging. Quarterly progress report, October 1--December 31, 1995  

SciTech Connect (OSTI)

Progress is reported for Los Alamos Nuclear Materials Stabilization and Packaging projects for the first quarter of Fiscal Year 1996. Development and production activities in Plutonium Recovery and Processing, Plutonium Packaging, and Uranium Recovery and Processing are covered. Packaging quality assurance activities are reported.

Chidester, K.M. [comp.

1996-05-01T23:59:59.000Z

202

Coal demonstration plants. Quarterly report, January-March 1979. [US DOE-supported  

SciTech Connect (OSTI)

Progress in US DOE-supported demonstration plants for the gasification and liquefaction of coal is reported: company, contract number, process description and flowsheet, history and progress in the current quarter. Related projects involve coal feeders, lock hoppers, values, etc. for feeding coal into high pressure systems, coal grinding equipment and measuring and process control instrumentation. (LTN)

None

1980-01-01T23:59:59.000Z

203

Natural Gas Imports and Exports. Third Quarter Report 1999  

SciTech Connect (OSTI)

The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditions and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline network and their planned in-service dates.

none

1999-10-01T23:59:59.000Z

204

Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA): Quarter 4 2013 Composite Data Products  

SciTech Connect (OSTI)

This report includes the composite data products (CDPs) for early fuel cell market deployments in quarter 4 of 2013. Results are presented for ARRA (projects funded by the American Recovery and Reinvestment Act of 2009 [ARRA]) and Combined (projects funded by DOE Interagency Agreements [IAA], Department of Defense Defense Logistics Agency [DLA], and ARRA).

Kurtz, J.; Sprik, S.

2014-06-01T23:59:59.000Z

205

The AMTEX Partnership. Second quarter report, Fiscal Year 1995  

SciTech Connect (OSTI)

The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby reserving and creating US jobs. The operations and program management of the AMTEX Partnership is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership.

Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

1995-03-01T23:59:59.000Z

206

Coal demonstration plants. Quarterly report, July-September 1979  

SciTech Connect (OSTI)

The status of two coal liquefaction demonstration plants and of four coal gasification demonstration plants is reviewed under the following headings: company involved, contract number, funding, process name, process description, flowsheet, schedule, history and progress during the July-September quarter, 1979. Supporting projects in coal feeding systems, valves, grinding equipment, instrumentation, process control and water treatment are discussed in a similar way. Conceptual design work on commercial plants for coal to methanol and for a HYGAS high BTU gas plant were continued. (LTN)

None

1980-07-01T23:59:59.000Z

207

Co-sponsored second quarter progress review conference on district heating  

SciTech Connect (OSTI)

A summary of the progress review conference on district heating and cooling systems is presented. The agenda and lists of speakers and attendees are presented. A history of district heating and some present needs and future policies are given and an excerpt from the National District Heating Program Strategy (DOE, March 1980) is included. Following the presentation, District Heating and Cooling Systems Program, by Alan M. Rubin, a fact sheet on DOE's Integrated Community Energy Systems Program and information from an oral presentation, District Heating and Cooling Systems for Communities Through Power Plant Retrofit Distribution Network, are given. The Second Quarterly Oral Report to the US DOE on the District Heating and Cooling Project in Detroit; the executive summary of the Piqua, Ohio District Heating and Cooling Demonstration Project; the Second Quarterly Report of the Moorehead, Minnesota District Heating Project; and the report from the Moorehead, Minnesota mayor on the Hot Water District Heating Project are presented.

None

1980-01-01T23:59:59.000Z

208

Decontamination systems information and research program. Quarterly report, January 1996--March 1996  

SciTech Connect (OSTI)

West Virginia University (WVU) and the US Department of Energy, Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement in August 1992 titled {open_quotes}Decontamination Systems Information and Research Programs{close_quotes} (DOE Instrument No.: DE-FC21-92MC29467). Requirements stipulated by the Agreement require WVU to submit quarterly Technical Progress reports. This report contains the efforts of the research projects comprising the Agreement for the 1st calendar quarter of 1996. For the period January 1 through December 31, 1996 twelve projects have been selected for funding, and the Kanawha Valley will continue under a no-cost extension. Three new projects have also been added to the program. This document describes these projects involving decontamination, decommissioning and remedial action issues and technologies.

NONE

1996-04-01T23:59:59.000Z

209

Northeast regional biomass program. First quarter report, October--December 1993  

SciTech Connect (OSTI)

This progress report presents summaries of various projects which were in operation or being planned during this quarter period. Projects included testing the efficiency of using wood chips as fuel in heating systems, barriers to commercial development of wood pellet fuels, studies of more efficient and less polluting wood stoves, work on landfill gas utilization, directories of facilities using biomass fuels, surveys of biomass conversion processes to liquid fuels, for commercial development, etc.

NONE

1994-05-01T23:59:59.000Z

210

The China Quarterly http://journals.cambridge.org/CQY  

E-Print Network [OSTI]

The China Quarterly http://journals.cambridge.org/CQY Additional services for The China Quarterly here Lowincome Housing in Chinese Cities: Policies and Practices Youqin Huang The China Quarterly (2012). Lowincome Housing in Chinese Cities: Policies and Practices. The China Quarterly, 212, pp

Huang, Youqin

211

SRTC Quarterly Report, October-November-December 1996  

SciTech Connect (OSTI)

This is the Savannah River Technology Center quarterly report for October - November - December 1996.

Ferrell, J.M. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1997-12-31T23:59:59.000Z

212

EDIN-USVI Clean Energy Quarterly: Volume 1, Issue 2, March 2011, Energy Development in Island Nations, U.S. Virgin Islands (Newsletter)  

SciTech Connect (OSTI)

This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and project-related renewable energy and energy efficiency projects.

Not Available

2011-03-01T23:59:59.000Z

213

Quarterly Coal Report, July--September 1994  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1994 and aggregated quarterly historical data for 1986 through the second quarter of 1994. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the United States, historical information has been integrated in this report. Additional historical data can also be found in the following EIA publications : Annual Energy Review 1993 (DOE/EIA-0384(93)), Monthly Energy Review (DOE/EIA-0035), and Coal Data: A Reference (DOE/EIA-0064(90)). The historical data in this report are collected by the EIA in three quarterly coal surveys (coal consumption at manufacturing plants, coal distribution, and coal consumption at coke plants), one annual coal production survey, and two monthly surveys of electric utilities. All data shown for 1993 and previous years are final. Data for 1994 are preliminary.

Not Available

1995-02-01T23:59:59.000Z

214

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1995  

Broader source: Energy.gov (indexed) [DOE]

Power (DOWEA-0939) - . Washington Administration Hot Springs-Garrison Fiber Optics Project Montana Bonneville Power (DOWEA-1002) Administration Proposed Relocxitionand...

215

Biomass power for rural development. Quarterly report, July 1--September 30, 1998  

SciTech Connect (OSTI)

In this quarter a large amount of time was spent doing project planning and budget preparation for the fiscal years 1998 and 1999. Many issues of long-term strategic planning and budgeting depend on the availability of Federal support, including financial, technical and political. It has become increasingly obvious that several significant barriers must be overcome in order to reach the final project goal of commercial replication of the technology. This report describes switchgrass conversion development, production activities, environmental analysis planning, and information and education. Appendices discuss the biomass project, sediment delivery, successful establishment of switchgrass, and legislative support for the biomass project.

Cooper, J.T.

1998-10-01T23:59:59.000Z

216

Research and development for the declassification productivity initiative. Quarterly report, January 1997--August 1997  

SciTech Connect (OSTI)

The highlight for the first quarter was the presentation of research progress and findings at the DPI Symposium on March 5, 1997. Since that presentation, additional progress was slowed down due to the decreased budget funding for year two, and consequently, the decrease in time-effort of the principal investigators. This report summarizes the progress in each of the topical areas to date. A research article has been prepared for publication for the Optical Character Recognition project; two progress reports are included for the Logical Analysis project; and two progress reports for the Knowledge Representation project. Research activities for the Tipster Technology project will resume this fall.

Bessonet, C.G. de

1997-03-05T23:59:59.000Z

217

Strategic Petroleum Reserve: Annual/quarterly report  

SciTech Connect (OSTI)

Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

Not Available

1994-02-16T23:59:59.000Z

218

Electric Power Quarterly, October-December 1984  

SciTech Connect (OSTI)

The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1985-04-01T23:59:59.000Z

219

Electric Power Quarterly, January-March 1986  

SciTech Connect (OSTI)

The ''Electric Power Quarterly (EPQ)'' provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The ''EPQ'' contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1986-07-21T23:59:59.000Z

220

Electric Power Quarterly, July-September 1984  

SciTech Connect (OSTI)

The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1985-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Clean Cities and Alternative Fuels Data Center Quarterly Report: 1st Quarter FY 2006 (Milestone Report)  

SciTech Connect (OSTI)

This quarterly report summarizes activities in Clean Cities and the Alternative Fuels Data Center. Find metrics on NREL activities and lists of new information in the AFDC.

Brodt-Giles, D.

2006-03-01T23:59:59.000Z

222

Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995  

SciTech Connect (OSTI)

This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

NONE

1995-07-01T23:59:59.000Z

223

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report  

SciTech Connect (OSTI)

This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’ Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.

Nguyen, Ba Nghiep; Simmons, Kevin L.

2013-04-04T23:59:59.000Z

224

Decontamination systems information and research program. Quarterly report, October 1995--December 1995  

SciTech Connect (OSTI)

West Virginia University (WVU) and the U.S. Department of Energy Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement on August 29, 1992 titled {open_quotes}Decontamination Systems Information and Research programs{close_quotes} (DOE Instrument No. DE-FC21-92MC29467) This report contains the efforts of the research projects comprising the Agreement for the 4th calendar quarter of 1995, and is the final quarterly report deliverable required for the period ending 31 December 1995. The projects reported for the WVU Cooperative Agreement are categorized into the following three areas: 1.0 In Situ Remediation Process Development, 2.0 Advanced Product Applications Testing, and 3.0 Information Systems, Public Policy, Community Outreach, and Economics. Summaries of the significant accomplishments for the projects reported during the period 1 October 95 through 31 December 95 are presented in the following discussions.

NONE

1995-12-01T23:59:59.000Z

225

Lessons Learned Quarterly Report, September 2001  

Broader source: Energy.gov [DOE]

Welcome to the 28th quarterly report on lessons learned in the NEPA process. This completes our seventh year of providing performance metrics, news, and guidance to the DOE NEPA Community. Please note the cumulative index in this issue.

226

Lessons Learned Quarterly Report, September 2002  

Broader source: Energy.gov [DOE]

Welcome to the 32nd quarterly report on lessons learned in the NEPA process. Much of this issue is devoted to reporting on the July DOE NEPA Community Meeting. Also featured is new NEPA-related guidance.

227

Lessons Learned Quarterly Report, September 2000  

Broader source: Energy.gov [DOE]

Welcome to the 24th quarterly report on lessons learned in the NEPA process. Note that this issue includes a cumulative index covering the past six years of reports.

228

Lessons Learned Quarterly Report, September 2008  

Broader source: Energy.gov [DOE]

Welcome to the 56th quarterly report on lessons learned in the NEPA process. We are pleased to feature EPA ’s web-based tool for NEPA practitioners, as well as the new DOE NEPA Website.

229

Lessons Learned Quarterly Report, September 2007  

Broader source: Energy.gov [DOE]

Welcome to the 52nd quarterly report on lessons learned in the NEPA process. This issue highlights the start of two major DOE EISs and features several guest-written articles.

230

Lessons Learned Quarterly Report, June 2004  

Broader source: Energy.gov [DOE]

Welcome to the 39th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned.

231

Lessons Learned Quarterly Report, March 1995  

Broader source: Energy.gov [DOE]

This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised questionnaire that was provided...

232

Lessons Learned Quarterly Report, March 2004  

Broader source: Energy.gov [DOE]

Welcome to the 38th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned.

233

Lessons Learned Quarterly Report, March 2003  

Broader source: Energy.gov [DOE]

Welcome to the 34th quarterly report on lessons learned in the NEPA process. We are pleased to feature the synergy between NEPA and the new DOE Order 450.1, Environmental Protection Program.

234

FOIA Quarterly Reports (Q3 2014)  

Broader source: Energy.gov [DOE]

Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

235

FOIA Quarterly Reports (Q1-2014)  

Broader source: Energy.gov [DOE]

Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

236

QuarterlyCouncil Continued on page 2  

E-Print Network [OSTI]

QuarterlyCouncil Continued on page 2 98 > In this issue Council Decisions > Updates on Council ­ or mishandled, in his opinion ­ important issues such as education funding. He's concerned about

237

Electric Power Quarterly, January-March 1983  

SciTech Connect (OSTI)

The Electric Power Quarterly (EPQ), a new series in the EIA statistical publications, provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. The data presented in this report were collected and published by the EIA to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275). This edition of the EPQ contains monthly data for the first quarter of 1983. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented for the first time on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1983-07-01T23:59:59.000Z

238

Electric power quarterly, July-September 1986  

SciTech Connect (OSTI)

The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Form 423 are presented on a plant-by-plant basis. The EPQ presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on Form IE-417.

Not Available

1987-02-04T23:59:59.000Z

239

The AMTEX Partnership{trademark}. Fourth quarter FY95 report  

SciTech Connect (OSTI)

The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. The operations and program management of the AMTEX Partnership{trademark} is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership. Progress is reported on the following projects: computer-aided fabric evaluation; cotton biotechnology; demand activated manufacturing architecture; electronic embedded fingerprints; on-line process control for flexible fiber manufacturing; rapid cutting; sensors for agile manufacturing; and textile resource conservation.

NONE

1995-09-01T23:59:59.000Z

240

Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the U.S. Department of Energy. Quarter ending December 31, 1996  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the First Quarter of Fiscal Year 1997 (October through December, 1996). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise. These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in four areas: (1) safeguards technology; (2) safeguards and material accountability; (3) computer security--distributed systems; and (4) physical and personnel security support. The remainder of this report describes the activities in each of these four areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.

Davis, G.; Mansur, D.L.; Ruhter, W.D.; Strauch, M.S.

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Lawrence Livermore National Laboratory Safeguards and Security quarterly progress report to the US Department of Energy: Quarter ending December 31, 1993  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the first quarter of fiscal year 1994 (October through December, 1993). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise. These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in five areas: (1) Safeguards Technology, (2) Safeguards and Decision Support, (3) Computer Security, (4) DOE Automated Physical Security, and (5) DOE Automated Visitor Access Control System. This report describes the activities in each of these five areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.

Davis, G.; Mansur, D.L.; Ruhter, W.D.; Steele, E.; Strait, R.S.

1994-01-01T23:59:59.000Z

242

Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the US Department of Energy: Quarter ending September 30, 1993  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the fourth quarter of Fiscal Year 1993 (July through September, 1993). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise. These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in five areas: Safeguards Technology, Safeguard System Studies, Computer Security, DOE Automated Physical Security and DOE Automated Visitor Access Control System. The remainder of this report describes the activities in each of these five areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.

Ruhter, W.D.; Strait, R.S.; Mansur, D.L.; Davis, G.

1993-10-01T23:59:59.000Z

243

Chemically assisted in situ recovery of oil shale. [Quarterly report], October 1, 1991--December 31, 1991  

SciTech Connect (OSTI)

The objective of this work is to investigate, in the laboratory, the parameters associated with a chemically assisted in situ recovery procedure, using hydrogen chloride (HCI), carbon dioxide (CO{sub 2}), and steam (H{sub 2}O), to obtain data useful to develop a process more economic than existing processes and to report all findings. The technical progress of the project is reported. The project status is that the solutions to the problems discussed in the third quarter status, were found to function satisfactorily. Future needs have been considered, and appropriate equipment and instrumentation changes have been designed. Only one experiment was performed this quarter, with some improvement over the previous experiments. The increase in shale oil recovery followed directly from the changes discussed last quarter, but the improvement could have been larger with wider-spread implementation of the changes. Equipment was purchased to rectify the need, and will be installed shortly. Further, a minor change in the design was necessary to account for the brittleness of high temperature electrical resistance heating tapes. The focus of the work this quarter has been on the development of computer software to enable the use of on-line parameter identification, the design of the instrumentation necessary to adequately observe the system, and the design of a continuous gas mixer to implement the experiment.

Ramirez, W.F.

1991-12-31T23:59:59.000Z

244

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1994  

Broader source: Energy.gov (indexed) [DOE]

Power Administration-Wide Operational Fiber Bonneville Power Bonneville Power Optics Project (DOEEA-0951) Administration - Wide Administration High Flux Isotope Reactor...

245

E-Print Network 3.0 - acquisition review quarterly Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

: 1. A quarter-by-quarter graduation plan You must meet with a major departmental advisor (either your... declared or proposed major) to develop a realistic quarter-by-quarter...

246

Decontamination systems information and research program. Quarterly report, April--June 1995  

SciTech Connect (OSTI)

West Virginia University (WVU) and the US Department of Energy Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement on August 29, 1992 titled `Decontamination Systems Information and Research Programs`. Requirements stipulated by the Agreement require WVU to submit Technical Progress reports on a quarterly basis. This report contains the efforts of the fourteen research projects comprising the Agreement for the period April 1 to June 30, 1995. During this period three new projects have been funded by the Agreement. These projects are: (1) WERC National Design Contest, (2) Graduate Interns to the Interagency Environmental Technology Office under the National Science and Technology Council, and (3) WV High Tech Consortium.

NONE

1995-07-01T23:59:59.000Z

247

2003 Winter Quarter A FLIGHT PROGRAMS AND PROJECTS DIRECTORATE QUARTERLY PUBLICATION  

E-Print Network [OSTI]

, stratospheric ozone, and cli- mate change. For example, Aura will allow scientists to trace air pol- (AURA Canaveral on an Atlas IIA launch vehicle. The launch and transfer orbit injection went off without a hitch

Christian, Eric

248

2002 Spring Quarter A FLIGHT PROGRAMS AND PROJECTS DIRECTORATE QUARTERLY PUBLICATION  

E-Print Network [OSTI]

; obtain measurable parameters in the outer solar wind; and perform in-situ measurement of energy dis) was launched on De- cember 2, 1995, that it would become the most prolific comet discoverer in the history to investigate the interior structure and dynamics that regulate energy flow and produce magnetic field

Christian, Eric

249

QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0,InformationU.S.Feet) Year Weekly7 (Released July

250

QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0,InformationU.S.Feet) Year Weekly7 (Released July1Q)

251

QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0,InformationU.S.Feet) Year Weekly7 (Released

252

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Broader source: Energy.gov (indexed) [DOE]

Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Presentation from May 6, 2010...

253

Vogtle 4th Quarter 2012 Construction Update | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vogtle 4th Quarter 2012 Construction Update Vogtle 4th Quarter 2012 Construction Update Addthis See the progress Southern Company is making on Vogtle 3&4 construction, the nation's...

254

Biomass power for rural development. Quarterly report, April 2, 1997--July 2, 1997  

SciTech Connect (OSTI)

The information in this report summarizes the major areas of project activities accomplished during the last quarter. Activities concerning conversion technologies have continued to be focused on gaining information and comparing similar systems world wide with project needs. One major effort was a trip to Denmark and Finland; the first section of the report details some of the trip highlights. The second section is a writeup of a previous trip. Additional conversion work undertaken at Iowa State University on the development of material handling, gas sampling, and gas analysis equipment is detailed. An update on the installation of field trial plots is also included. Very brief summaries are provided of quarterly activities, briquette production from switchgrass, and the development of geographical information systems are also included. 8 figs., 1 tab.

Cooper, J.T.

1997-10-01T23:59:59.000Z

255

Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

Not Available

1993-07-01T23:59:59.000Z

256

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Fourth Quarterly Report  

SciTech Connect (OSTI)

This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNL’s Legal Services were submitted to all the parties for signatures.

Nguyen, Ba Nghiep; Simmons, Kevin L.

2013-12-02T23:59:59.000Z

257

Renewable Energy Finance Tracking Initiative (REFTI): Snapshot of Recent Geothermal Financing Terms, Fourth Quarter 2009 - Second Half 2011  

SciTech Connect (OSTI)

This report is a review of geothermal project financial terms as reported in the National Renewable Energy Laboratory's Renewable Energy Finance Tracking Initiative (REFTI). The data were collected over seven analysis periods from the fourth quarter (Q4) of 2009 to the second half (2H) of 2011.

Lowder, T.; Hubbell, R.; Mendelsohn, M.; Cory, K.

2012-09-01T23:59:59.000Z

258

Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 3 2012 Composite Data Products  

SciTech Connect (OSTI)

This report from the U.S. Department of Energy's National Renewable Energy Laboratory includes early fuel cell market composite data products for the third quarter of 2012 for American Recovery and Reinvestment Act (ARRA) and combined (IAA, DLA, ARRA) deployment projects.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.; Post, M.

2013-01-01T23:59:59.000Z

259

Calorimetry exchange program quarterly data report, fourth quarter CY92  

SciTech Connect (OSTI)

The goals of the Calorimetry Sample Exchange Program are: (1) discuss measurement differences (2) review and improve analytical measurements and methods (3) discuss new measurement capabilities (4) provide data to DOE on measurement capabilities to evaluate shipper- receiver differences (5) provide characterized or standard materials as necessary for exchange participants (6) provide a measurement control program for plutonium analysis A sample Of PUO2 powder is available at each participating site for NDA measurement, including either or both calorimetry and high-resolution gamma-ray spectroscopy, the elements which are typically combined to provide a calorimetric assay of plutonium. The facilities measure the sample as frequently and to the level of precision which they desire, and then submit the data to the Exchange for analysis. The data report includes summary tables for each measurement and charts showing the performance of each laboratory. Comparisons are made to the accepted values for the exchange sample and to data previously reported by that laboratory. This information is presented, in the form of quarterly reports as this document provides and as annual reports, intended for use by Exchange participants in measurement control programs, or to indicate when bias corrections may be appropriate. No attempt, however, has been made to standardize methods or frequency of data collection, calibration, or operating procedures. Direct comparisons between laboratories may, therefore, be misleading since data have not been collected to the same precision or for the same time periods. A meeting of the participants of the Calorimetry Exchange is held annually at EG&G Mound Applied Technologies. The purposes of this meeting are to discuss measurement differences, problems, and new measurement capabilities, and to determine the additional activities needed to fulfill the goals of the Exchange.

Barnett, T.M.

1992-12-31T23:59:59.000Z

260

Naturally fractured tight gas reservoir detection optimization. Quarterly report, January 1, 1997--March 31, 1997  

SciTech Connect (OSTI)

This document contains the quarterly report dated January 1-March 31, 1997 for the Naturally Fractured Tight Gas Reservoir Detection Optimization project. Topics covered in this report include AVOA modeling using paraxial ray tracing, AVOA modeling for gas- and water-filled fractures, 3-D and 3-C processing, and technology transfer material. Several presentations from a Geophysical Applications Workshop workbook, workshop schedule, and list of workshop attendees are also included.

NONE

1998-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EDIN-USVI Clean Energy Quarterly: Volume 1 November 2010, Energy Development in Island Nations, U.S. Virgin Islands (Newsletter)  

SciTech Connect (OSTI)

This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and EDIN-sponsored renewable energy and energy efficiency projects.

Not Available

2010-11-01T23:59:59.000Z

262

QUARTERLY PROGRESS REPORT January 1, 2001 -March 31, 2001  

E-Print Network [OSTI]

the development of best management practices (BMPs), additional soil and plant/water samples were collected from characteristics of berm soils with high Pb contamination were identified using rainwater and water tests. 7 quarter 3rd quarter 4th quarter Sample Collection Sample analysis Leachability test Fractionation

Ma, Lena

263

The China Quarterly http://journals.cambridge.org/CQY  

E-Print Network [OSTI]

The China Quarterly http://journals.cambridge.org/CQY Additional services for The China Quarterly and Boston: Brill, 2012. vii + 394 pp., 133.00 $182.00. ISBN 9789004218444 Benjamin A. Elman The China this article: Benjamin A. Elman (2012). The China Quarterly, 212, pp 11451148 doi:10.1017/ S0305741012001440

Elman, Benjamin

264

Natural gas imports and exports. Second quarter report  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1997 (April through June).

NONE

1997-12-31T23:59:59.000Z

265

Idaho National Laboratory Quarterly Performance Analysis  

SciTech Connect (OSTI)

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INL from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.

Lisbeth Mitchell

2014-11-01T23:59:59.000Z

266

Quarterly project status report, April-June 1982  

SciTech Connect (OSTI)

Economic Regulatory Administration (ERA) has a requirement to report to Congress on determinations made by State regulatory authorities and nonregulated utilities regarding their purposes of Title I and III of the Public Utility Regulatory Policies Act (PURPA), of 1978. The purposes stated in PURPA are to promote conservation of energy supplied by utilities, efficiency in use of utilities, and equitable rates for utility consumers. ERA is also required to assist state regulatory authorities and nonregulated utilities in carrying out their PURPA responsibilities by implementing information dissemination activities. This report summarizes contractual support to ERA in implementing its information data base to its clientele. Progress is reported on: information acquisition/dissemination; information analysis and retrieval; information storage, and information maintenance. (MCW)

Not Available

1982-01-01T23:59:59.000Z

267

Recommendation 179: DOE Quarterly Project Reviews | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |Rebecca Matulka About Us RebeccaReciprocity9: DOE

268

BS in Environmental Science: Typical Program of Study1 4 year (2011 Catalog) Fall Quarter Winter Quarter Spring Quarter  

E-Print Network [OSTI]

BS in Environmental Science: Typical Program of Study1 ­ 4 year (2011 Catalog) Fall Quarter Sciences (5) Core (5)4 ENSC 100Introduction to Environmental Science (2)5 Core (5) Sophomore BIOL) 1 In order to earn a Bachelor of Science in Environmental Science, a student must complete 180

Carter, John

269

Quarterly coal report July--September 1996, February 1997  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1996 and aggregated quarterly historical data for 1990 through the second quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data. 8 figs., 72 tabs.

NONE

1997-02-01T23:59:59.000Z

270

Idaho National Laboratory Quarterly Performance Analysis - 3rd Quarter FY2014  

SciTech Connect (OSTI)

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other non-reportable issues identified at INL from July 2013 through June 2014.

Lisbeth A. Mitchell

2014-09-01T23:59:59.000Z

271

Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014  

SciTech Connect (OSTI)

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

Lisbeth A. Mitchell

2014-06-01T23:59:59.000Z

272

RCRA groundwater monitoring data. Quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect (OSTI)

Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between April and June 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-10-01T23:59:59.000Z

273

High SO{sub 2} removal efficiency testing. Quarterly status report, July--September 1994  

SciTech Connect (OSTI)

This document provides a discussion of the technical progress on the project ``High Efficiency SO{sub 2} Removal Testing``, for the time period 1 July through 30 September 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades evaluated mostly involve using additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Company Kintigh Station (Option V). By the end of September 1994, testing was completed for the base project and for all options. The document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the fourth quarter of calendar year 1994. Section 5 contains a brief acknowledgement.

Blythe, G.

1994-12-01T23:59:59.000Z

274

Quarterly Report - May through July 2012  

SciTech Connect (OSTI)

The first quarter of my postgraduate internship has been an extremely varied one, and one which I have tackled several different aspects of the project. Because this is the beginning of a new investigation for the Research Library, I think it is appropriate that I explore data management at LANL from multiple perspectives. I have spent a considerable amount of time doing a literature search and taking notes on what I've been reading in preparation for potential writing activities later. The Research Library is not the only research library exploring the possibility of providing services to their user base. The Joint Information Systems Committee (JISC) and the Digital Curation Centre (DCC) in the UK are actively pursuing possibilities to preserve the scientific record. DataOne is a U.S. National Science Foundation (NSF) initiative aimed at helping to curate bioscience data. This is just a tiny sample of the organizations actively looking into the issues surrounding data management on an organizational, cultural, or technical level. I have included a partial bibliography of some papers I have read. Based on what I read, various discussions, and previous library training, I have begun to document the services I feel I could provide researchers in the context of my internship. This is still very much a work in progress as I learn more about the landscape in libraries and at the Laboratory. I have detailed this process and my thoughts on the issue below. As data management is such a complex and interconnected activity, it is impossible to investigate the organizational and cultural needs of the researchers without familiarizing myself with technologies that could facilitate the local cataloging and preservation of data sets. I have spent some time investigating the repository software DSpace. The library has long maintained the digital object repository aDORe, but the differences in features and lack of a user interface compared to DSpace have made DSpace a good test bed for this project. However my internship is not about repository software and DSpace is just one potential tool for supporting researchers and their data. More details my repository investigation. The most exciting aspect of the project thus far has been meeting with researchers, some of which are potential collaborators. Some people I have talked with have been very interested and enthusiastic about the possibility of collaborating, while others have not wanted to discuss the issue at all. I have had discussions with individual researchers managing their own lab as well as with researchers who are part of much larger collaborations. Three of the research groups whom I feel are of particular interest are detailed below. I have added an appendix below which goes into more detail about the protein crystallography community which has addressed the complete data life cycle within their field end to end. The issue of data management is much bigger than just my internship and there are several people and organizations exploring the issues at the Laboratory. I am making every effort to stay focused on small science data sets and ensure that my activities use standards-based approaches and are sustainable.

Miller, Laniece E. [Los Alamos National Laboratory

2012-08-09T23:59:59.000Z

275

High SO{sub 2} removal efficiency testing. Quarterly status report, October 1994--December 1994  

SciTech Connect (OSTI)

This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO{sub 2} Removal Testing{close_quotes}, for the time period 1 October through 31 December 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low-capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades to be evaluated primAllily involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation (NYSEG) Kintigh Station (Option V). By the beginning of the fourth quarter of 1994, testing had been completed for the base project and for all options. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1995. Section 5 contains a brief acknowledgement.

Blythe, G.

1995-02-03T23:59:59.000Z

276

Oxygen Transport Ceramic Membranes Quarterly Report  

E-Print Network [OSTI]

/Reaction rates in Ion 21 Transport Membranes using Isotope Tracer and Transient Kinetic Techniques CONCLUSIONS 30Oxygen Transport Ceramic Membranes Quarterly Report January 2003 ­ March 2003 Principal Authors on the thermodynamic properties of the membrane materials are continued to develop a complete model for the membrane

Eagar, Thomas W.

277

Augmented Reality for Close Quarters Combat  

SciTech Connect (OSTI)

Sandia National Laboratories has developed a state-of-the-art augmented reality training system for close-quarters combat (CQB). This system uses a wearable augmented reality system to place the user in a real environment while engaging enemy combatants in virtual space (Boston Dynamics DI-Guy). Umbra modeling and simulation environment is used to integrate and control the AR system.

None

2013-09-20T23:59:59.000Z

278

NOAA Air Resources Laboratory Quarterly Activity Report  

E-Print Network [OSTI]

and Hawaii Meteorological Grids for NCEP Atmospheric Turbulence and Diffusion Division 18. Climate 19. Air for Europe convention on Long-Range Transport of Air Pollution. o.russell.bullock@noaa.gov 3. CarbonNOAA Air Resources Laboratory Quarterly Activity Report (January ­ March 2008) Contents Highlights

279

Lessons Learned Quarterly Report, March 2005  

Broader source: Energy.gov [DOE]

Welcome to the 42nd quarterly report on lessons learned in the NEPA process. We are pleased to introduce our new Assistant Secretary for Environment, Safety and Health. John Spitaleri Shaw is a strong supporter of good NEPA compliance, as evidenced during our interview with him and in his February 16, 2005, memorandum, both of which are summarized in this issue.

280

Quarterly Report for July -September 1999  

E-Print Network [OSTI]

;#12;Table of Contents 1. MEASUREMENTS OF STEAM-WATER RELATIVE PERMEABILITY 1 1.1 BACKGROUND 1 1 CONDUCTIVITY OF HEAT FLUX SENSORS 8 2.4 FUTURE WORK 9 3. INFERRING ENDPOINT SATURATION FROM BOILING EXPERIMENTS of fluid saturation in the core this quarter. 1.1 BACKGROUND An X-ray CT technique has been used in recent

Stanford University

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Lessons Learned Quarterly Report, March 1996  

Broader source: Energy.gov [DOE]

Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPArelated information, and enhanced the format for better clarity and overall readability.

282

Lessons Learned Quarterly Report, June 2000  

Broader source: Energy.gov [DOE]

Welcome to the 23rd quarterly report on lessons learned in theNEPA process. This issue features highlights from the May 2000 NEPA Compliance Officers Meeting. Also featured is an article on NEPA and the wildfire at Los Alamos. This is an unusually long issue, due simply to the abundance of information to be shared.

283

Lessons Learned Quarterly Report, June 2005  

Broader source: Energy.gov [DOE]

Welcome to the 43rd quarterly report on lessons learned in the NEPA process. In this issue we take a look at our hard-working NEPA Compliance Of?cers, who share bits of wisdom (and a little humor) gained from their lessons learned implementing NEPA. Countless thanks to all NCOs for their dedication, ?exibility, and perseverance.

284

Lessons Learned Quarterly Report, December 2006  

Broader source: Energy.gov [DOE]

Welcome to the 49th quarterly report on lessons learned in the NEPA process. In this issue, we feature the initiation of three signi?cant EISs: the Complex 2030 Supplemental Programmatic EIS, the Supplemental Yucca Mountain Repository EIS, and the expanded Yucca Mountain Rail EIS.

285

Lessons Learned Quarterly Report, December 2007  

Broader source: Energy.gov [DOE]

Welcome to the 53rd quarterly report on lessons learned in the NEPA process. Many in the Department’s NEPA Community were called on to give extraordinary time and resources to the preparation of key EISs issued recently and highlighted in this LLQR. We anticipate a busy 2008 as well.

286

Lessons Learned Quarterly Report, December 2005  

Broader source: Energy.gov [DOE]

Welcome to the 45th quarterly report on lessons learned in the NEPA process. We thank all those who participated in the NEPA 35 conference. You made it successful. We hope you are as inspired as we are by the spirit of NEPA Section 101and the challenge to improve the implementation of NEPA.

287

Lessons Learned Quarterly Report, March 2008  

Broader source: Energy.gov [DOE]

Welcome to the 54th quarterly report on lessons learned in the NEPA process. As noted in articles on recently issued DOE EISs (Complex Transformation, Yucca Mountain Repository and Railroad, and Western Energy Corridors), DOE has received and is responding to extensive public comment. This issue also pays tribute to two women who have made extraordinary contributions to NEPA implementation.

288

Lessons Learned Quarterly Report, March 2007  

Broader source: Energy.gov [DOE]

Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Of?ce of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the NEPA process. The Of?ce began by presenting cost and time metrics and “What Worked and What Didn’t Work.” Other features were soon introduced.

289

Lessons Learned Quarterly Report, September 1997  

Broader source: Energy.gov [DOE]

Welcome again to the Quarterly Report on lessons learned in the NEPA process. This issue features NEPA success stories from field organizations: how the NEPA process helped resolve cultural resource protection issues at Fernald, and how innovative approaches are aiding preparation of a Site-wide EIS for Sandia, New Mexico.

290

Lessons Learned Quarterly Report, June 2007  

Broader source: Energy.gov [DOE]

Welcome to the 51st quarterly report on lessons learned in the NEPA process. This issue features collaboration as a key element of a successful NEPA process. Related articles discuss approaches to and bene?ts of collaboration and illustrate various applications.

291

Lessons Learned Quarterly Report, September 2004  

Broader source: Energy.gov [DOE]

Welcome to the 40th quarterly report on lessons learned in the NEPA process. That’s 40 issues! Have you read them all? We are pleased to feature the July 2004 NEPA Community Meeting in this issue, as well as our annual update of the cumulative index to LLQR.

292

Lessons Learned Quarterly Report, June 2006  

Broader source: Energy.gov [DOE]

Welcome to the 47th quarterly report on lessons learned in the NEPA process. The quality of our NEPA process affects the quality of DOE’s decisions. Our appreciation goes out to all the NCOs and NEPA Document Managers who work every day to build quality into NEPA documents.

293

Lessons Learned Quarterly Report, September 2003  

Broader source: Energy.gov [DOE]

Welcome to the 36th quarterly report on lessons learned in the NEPA process. We are pleased to feature the July 2003 NEPA Community Meeting in this issue. Also, please note that the cumulative index, a useful reference tool, is printed in this issue.

294

October 2007 CEELP Quarterly Environmental & Energy Newsletter  

E-Print Network [OSTI]

October 2007 CEELP Quarterly Environmental & Energy Newsletter Issue 2 The following items appear in this edition: (1) Responsibilities for Energy Policy: Movements in Wales and Westminster (2) Meeting the Energy Challenge - A White Paper on Energy, 2007 (3) The Energy White Paper and Devolution (4) Energy Aspects

Martin, Ralph R.

295

Quarter 1, 2012 Page 1 of 2  

E-Print Network [OSTI]

incompatible chemicals? 16. Are incompatible chemicals segregated according to SU storage scheme? 17. Is lab-level contact. (Return roster with completed Q1-12 Self-Inspection checklist to department) 22. Our lab has. Make sure that ALL rooms listed for your PI have been included as part of this quarter's self

Ford, James

296

Augmented Reality for Close Quarters Combat  

ScienceCinema (OSTI)

Sandia National Laboratories has developed a state-of-the-art augmented reality training system for close-quarters combat (CQB). This system uses a wearable augmented reality system to place the user in a real environment while engaging enemy combatants in virtual space (Boston Dynamics DI-Guy). Umbra modeling and simulation environment is used to integrate and control the AR system.

None

2014-06-23T23:59:59.000Z

297

New Mexico State University Arrowhead Center PROSPER Project  

SciTech Connect (OSTI)

This document is the final technical report of the Arrowhead Center Prosper Project at New Mexico State University. The Prosper Project was a research and public policy initiative funded by the National Energy Technology Laboratory (NETL) of the U.S. Department of Energy (DOE). The Prosper project (DOE Grant Number DE-NT0004397) began on October 1, 2008 (FY2009, Quarter 1) and ended on December 31, 2012 (FY2013, Quarter 1). All project milestones were completed on time and within the budget. This report contains a summary of ten technical reports resulting from research conducted during the project. This report also contains a detailed description of the research dissemination and outreach activities of the project including a description of the policy impacts of the project. The report also describes project activities that will be maintained after the end of the project.

Peach, James

2012-12-31T23:59:59.000Z

298

Fossil-energy program. Quarterly progress report for June 30, 1983  

SciTech Connect (OSTI)

This quarterly report covers the progress made during the period March 31 through June 30 for the Oak Ridge National Laboratory research and development projects that are carried out in support of the increased utilization of coal and other fossil fuels as sources of clean energy. These projects are supported by various parts of DOE including Fossil Energy, Basic Energy Sciences, Office of Health and Environmental Research, Office of Environmental Compliance and Overview, the Electric Power Research Institute, and by the Tennessee Valley Authority and the EPA Office of Research and Development through inter-agency agreement with DOE.

McNeese, L.E.

1983-08-01T23:59:59.000Z

299

FY12 Quarter 3 Computing Utilization Report – LANL  

SciTech Connect (OSTI)

DSW continues to dominate the capacity workload, with a focus in Q3 on common model baselining runs in preparation for the Annual Assessment Review (AAR) of the weapon systems. There remains unmet demand for higher fidelity simulations, and for increased throughput of simulations. Common model baselining activities would benefit from doubling the resolution of the models and running twice as many simulations. Capacity systems were also utilized during the quarter to prepare for upcoming Level 2 milestones. Other notable DSW activities include validation of new physics models and safety studies. The safety team used the capacity resources extensively for projects involving 3D computer simulations for the Furrow series of experiments at DARHT (a Level 2 milestone), fragment impact, surety theme, PANTEX assessments, and the 120-day study. With the more than tripling of classified capacity computing resources with the addition of the Luna system and the safety team's imminent access to the Cielo system, demand has been met for current needs. The safety team has performed successful scaling studies on Luna up to 16K PE size-jobs with linear scaling, running the large 3D simulations required for the analysis of Furrow. They will be investigating scaling studies on the Cielo system with the Lustre file system in Q4. Overall average capacity utilization was impacted by negative effects of the LANL Voluntary Separation Program (VSP) at the beginning of Q3, in which programmatic staffing was reduced by 6%, with further losses due to management backfills and attrition, resulting in about 10% fewer users. All classified systems were impacted in April by a planned 2 day red network outage. ASC capacity workload continues to focus on code development, regression testing, and verification and validation (V&V) studies. Significant capacity cycles were used in preparation for a JOWOG in May and several upcoming L2 milestones due in Q4. A network transition has been underway on the unclassified networks to increase access of all ASC users to the unclassified systems through the Yellow Turquoise Integration (YeTI) project. This will help to alleviate the longstanding shortage of resources for ASC unclassified code development and regression testing, and also make a broader palette of machines available to unclassified ASC users, including PSAAP Alliance users. The Moonlight system will be the first capacity resource to be made available through the YETI project, and will make available a significant increase in cycles, as well as GPGPU accelerator technology. The Turing and Lobo machines will be decommissioned in the next quarter. ASC projects running on Cielo as part of the CCC-3 include turbulence, hydrodynamics, burn, asteroids, polycrystals, capability and runtime performance improvements, and materials including carbon and silicone.

Wampler, Cheryl L. [Los Alamos National Laboratory; McClellan, Laura Ann [Los Alamos National Laboratory

2012-07-25T23:59:59.000Z

300

Stockpile Management Program quarterly report. 2. quarter 1998  

SciTech Connect (OSTI)

The objective of this program is to ensure the safety and reliability of the enduring nuclear weapons stockpile by: (1) maintaining robust nuclear facilities that comprise the infrastructure needed to conduct the various laboratory programs; (2) maintaining capabilities and qualified personnel needed to successfully implement the Program and ensure availability of competencies; (3) meeting present and future production and surveillance requirements to support the enduring stockpile and other programmatic deliverables; and (4) capturing and maintaining expertise and competency in the processes and technologies required to build a complete physics package. Summaries of accomplishments are presented for approximately 30 projects managed under this program.

NONE

1998-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and Project Management

302

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and Project

303

Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly report, April 1--June 30, 1997  

SciTech Connect (OSTI)

The primary goal of this project is the engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. The project scope includes laboratory research and bench-scale testing on six coals to optimize these processes, followed by the design, construction, and operation of a 2 t/hr process development unit (PDU). Accomplishments during the quarter are described on the following tasks and subtasks: Development of near-term applications (engineering development and dewatering studies); Engineering development of selective agglomeration (bench-scale testing and process scale-up); PDU and advanced column flotation module (coal selection and procurement and advanced flotation topical report); Selective agglomeration module (module operation and clean coal production with Hiawatha, Taggart, and Indiana 7 coals); Disposition of the PDU; and Project final report. Plans for next quarter are discussed and agglomeration results of the three tested coals are presented.

Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C.

1997-12-31T23:59:59.000Z

304

Mixed Waste Management Facility groundwater monitoring report. Second quarter 1994  

SciTech Connect (OSTI)

Currently, 125 wells monitor groundwater quality in the uppermost aquifer beneath the Mixed Waste Management Facility (MWMF) at the Savannah River Site. Samples from the wells are analyzed for selected heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. During second quarter 1994, chloroethene (vinyl chloride), 1,1-dichloroethylene, gross alpha, lead, tetrachloroethylene, trichloroethylene, or tritium exceeded final Primary Drinking Water Standards (PDWS) in approximately half of the downgradient wells at the MWMF. Consistent with historical trends, elevated constituent levels were found primarily in Aquifer Zone. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents during second quarter 1994. Sixty-two of the 125 monitoring wells contained elevated tritium activities. Trichloroethylene concentrations exceeded the final PDWS in 23 wells. Chloroethene, 1,1-dichloroethylene, lead, and tetrachloroethylene, elevated in one or more wells during second quarter 1994, also occurred in elevated levels during first quarter 1994. These constituents generally were elevated in the same wells during both quarters. Gross alpha, which was not elevated in any well during first quarter 1994, was elevated in one well during second quarter. Copper, mercury, and nonvolatile beta were elevated during first quarter 1994 but not during second quarter.

Chase, J.A.

1994-09-01T23:59:59.000Z

305

Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-04-01T23:59:59.000Z

306

Quarterly report of RCRA groundwater monitoring data for period October 1, 1993--December 31, 1993  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between November 20 and February 25, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

Jungers, D.K.

1994-04-01T23:59:59.000Z

307

Research and development for the declassification productivity initiative. Quarterly report No. 3, July 1996--September 1996  

SciTech Connect (OSTI)

The third quarter began with a full-day workshop on declassification by Mr. Scott R. Lowery referred by the Technical Officer, Tom Curtis. This workshop, at Southern University, Baton Rouge, was attended by all the principal investigators. Various degrees of program have been observed for this period in all sub-areas of the DPI project. An initial evaluation of TIPSTER has revealed that its relevance to declassification would depend on a set of questions identified for further investigation. Progress is reported in developing a segment of a representation language that could be sued to enable classifiers to classify and enter information and ask questions. A prototype test suite with approximately 145 pages is being finalized to be forwarded to UNLV for testing and analysis. The progress on the computer programs developed f or the logical analysis approval is also reported along with a timeline of specific tasks for the fourth quarter.

NONE

1996-11-01T23:59:59.000Z

308

Power systems development facility. Quarterly technical progress report, January 1, 1994--March 31, 1994  

SciTech Connect (OSTI)

This quarterly technical progress report summarizes work completed during the last quarter of the Second Budget Period, January 1 through March 31, 1994, entitled {open_quotes}Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.{close_quotes} The objective of this project is to evaluate hot gas particulate control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

Not Available

1994-07-01T23:59:59.000Z

309

Quarterly coal report July--September 1995, February 1996  

SciTech Connect (OSTI)

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for July through September 1995 and aggregated quarterly historical data for 1987 through the second quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

NONE

1996-02-16T23:59:59.000Z

310

Lessons Learned Quarterly Report, September 2005  

Broader source: Energy.gov [DOE]

Welcome to the 44th quarterly report on lessons learned in the NEPA process. This issue completes our 11th year publishing LLQR, and as we go to press, we’re preparing to mark an even more impressive milestone – our observance of the 35th anniversary of NEPA. We’re busily working on all the details that will make this a great conference. We hope to see YOU there.

311

Lessons Learned Quarterly Report, September 2006  

Broader source: Energy.gov [DOE]

Welcome to the 48th quarterly report on lessons learned in the NEPA process. We remember Lynton Caldwell, who promoted a vision of productive harmony – a balance of the interests of the environment and human society. The NEPA process remains a useful tool for pursuing that vision by integrating environmental analysis into the decisionmaking process. With this issue, we have completed 12 years of LLQR.

312

2nd Quarter Transportation Report FY 2014  

SciTech Connect (OSTI)

This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.

Gregory, L.

2014-07-30T23:59:59.000Z

313

Mixed Waste Management Facility groundwater monitoring report: Third quarter 1994  

SciTech Connect (OSTI)

Currently, 125 wells monitor groundwater quality in the uppermost aquifer beneath the Mixed Waste Management Facility (MWMF) at the Savannah River Site. Samples from the wells are analyzed for selected heavy metals, herbicides/pesticides, indicator parameters, radionuclides, volatile organic compounds, and other constituents. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents during third quarter 1994. Sixty-four (51%) of the 125 monitoring wells contained elevated tritium activities. Trichloroethylene concentrations exceeded the final PDWS in 22 (18%) wells. Chloroethene, 1,1-dichloroethylene, and tetrachloroethylene, elevated in one or more wells during third quarter 1994, also occurred in elevated levels during second quarter 1994. These constituents generally were elevated in the same wells during both quarters. Gross alpha, which was elevated in only one well during second quarter 1994, was elevated again during third quarter. Mercury, which was elevated during first quarter 1994, was elevated again in one well. Dichloromethane was elevated in two wells for the first time in several quarters.

Not Available

1994-12-01T23:59:59.000Z

314

Quarterly Analysis Review February 2015 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

The Quarterly Analysis Review (QAR) surveys both work supported by the Vehicle Technologies Office Analysis Program within the broader context of energy and automotive U.S. and...

315

U.S. Energy Information Administration | Quarterly Coal Report...  

Gasoline and Diesel Fuel Update (EIA)

and Institutional Users by Census Division and State (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2014 Year to Date...

316

adult mortality quarterly: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Year Unit-18 Lecturer Files Chemistry Websites Summary: or as soon as practicable for courses being offered the next academic year..." Winter 2013 One quarter prior deadline....

317

Lessons Learned Quarterly Report Archive | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

on-the-scene reporter Carolyn Osborne. There are also several articles related to global climate change and NEPA. March 3, 2008 Lessons Learned Quarterly Report, March 2008...

318

Natural gas imports and exports: First quarter report 1995  

SciTech Connect (OSTI)

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This quarter`s focus is market penetration of gas imports into New England. Attachments show the following: % takes to maximum firm contract levels and weighted average per unit price for the long-term importers, volumes and prices of gas purchased by long-term importers and exporters, volumes and prices for gas imported on short-term or spot market basis, and gas exported short-term to Canada and Mexico.

NONE

1995-07-01T23:59:59.000Z

319

High efficiency SO{sub 2} removal testing. Quarterly report, 1 January--31 March 1995  

SciTech Connect (OSTI)

This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option 1), the Southwestern Electric Power Company Pirkey Station (Option 11), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation`s (NYSEG) Kintigh Station (Option V). Testing has been completed for all six sites. Following the introduction, this document divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the second quarter of calendar year 1995. Section 5 contains a brief acknowledgement.

NONE

1995-04-11T23:59:59.000Z

320

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

322

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

323

Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter  

SciTech Connect (OSTI)

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information” requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

Lisbeth A. Mitchell

2013-11-01T23:59:59.000Z

324

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

325

RESULTS FOR THE FOURTH QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS  

SciTech Connect (OSTI)

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

Bannochie, C.

2012-01-31T23:59:59.000Z

326

Identification and Evaluation of Fluvial-Dominated Deltaic Reservoirs. Quarterly technical report, April 1 -June 30, 1997  

SciTech Connect (OSTI)

This document is provided as a Quarterly Technical Progress Report for the program entitled `Identification and Evaluation of Fluvial- Dominated Deltaic (Class 1 Oil) Reservoirs in Oklahoma`, covering the reporting period of April 1 - June 30, 1997. Work is progressing as expected for the project. The FDD computer facility is fully operational. During this quarter, there were 27 industry individuals who used the facility. The Tonkawa Play workshop is scheduled for July 9, 1997 in Norman. The Tonkawa publication and presentation graphics are nearly completed. The Bartlesville workshop is scheduled for October and November, 1997, in three different sites. Text and illustrations for that play are in progress. This project is serving an extremely valuable role in the technology transfer activities for the Oklahoma petroleum industry, with very positive industry feedback.

Banken, M.K.; Andrews, R.

1997-09-12T23:59:59.000Z

327

Treatment of metal-laden hazardous wastes with advanced clean coal technology by-products. Quarterly report, November 1994--February 1995  

SciTech Connect (OSTI)

This second quarterly report describes work during the second three months of the University of Pittsburgh`s (Pitt`s) project on the {open_quotes}Treatment of Metal-Laden Hazardous Wastes with Advanced Clean Coal Technology By-Products.{close_quotes} Participating with Pitt on this project are Dravo Lime Company (DLC), Mill Service, Inc. (MSI) and the Center for Hazardous Materials Research (CHMR). The report describes the activities of the project team during the reporting period. The principal work has focussed upon the acquisition of by-product samples and their initial analysis. Other efforts during the second quarter have been directed toward identifying the first hazardous waste samples and preparing for their treatment and analysis. Relatively little data has yet been collected. Major presentation of technical details and data will appear for the first time in the third quarterly report. The activity on the project during the second quarter of Phase One, as presented in the following sections, has fallen into seven areas: (1) Acquiring by-products, (2) Analyzing by-products, (3) Identifying, analyzing and treating suitable hazardous wastes, (4) Carrying out the quality assurance/quality control program, (5) Developing background, and (6) Initiating public relations

NONE

1995-03-01T23:59:59.000Z

328

Shale oil value enhancement research. Quarterly report, March 1 - May 31, 1994  

SciTech Connect (OSTI)

Activities during this quarter focused on integrating the various tasks and elements. During Phase-1, substantial effort was placed on designing and automating the identification of molecular types present in shale oil. The ability to know the molecular composition and to track a given ``target`` species through the initial concentration steps was deemed critically important to the ultimate success of the three-phase project. It has been this molecular tracking ability that clearly distinguishes the JWBA work from prior shale oil research. The major software and hardware tasks are not in place to rapidly perform these analytical efforts. Software improvements are expected as new questions arise. The existence of the major nitrogen and oxygen types in shale oil has been confirmed. Most importantly, the ability to convert higher molecular weight types to lower molecular weight types was preliminarily confirmed in the present quarter. This is significant because it confirms earlier hypothesis that values are found though out the boiling range. Potential yields of extremely high value chemicals, e.g., $1000/bbl of up to 10% by weight of the barrel remain a feasible objective. Market and economic assessment continue to show encouraging results. Markets for specialty and fine chemicals containing a nitrogen atom are expanding both in type and application. Initial discussions with pharmaceutical and agrochemical industries show a strong interest in nitrogen-based compounds. Major progress was made during this quarter in completing agreements with industry for testing of shale oil components for biological activity. Positive results of such testing will add to the previously known applications of shale oil components as pure compounds and concentrates. During this quarter, we will formulate the pilot plant strategy for Phase-11(a).

NONE

1994-12-31T23:59:59.000Z

329

Hot gas cleanup test facility for gasification and pressurized combustion. Quarterly report, April--June 1995  

SciTech Connect (OSTI)

This quarterly technical progress report summarizes the work completed during the first quarter, April 1 through June 30, 1995. The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasificafion and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the particulate control devices (PCDS) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter. Delivery and construction of the process structural steel continued at a good pace during the quarter.

NONE

1995-08-01T23:59:59.000Z

330

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Third Quarterly Report  

SciTech Connect (OSTI)

This quarterly report summarizes the status for the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The CRADA documents have been processed by PNNL Legal Services that is also coordinating the revision effort with the industrial parties to address DOE’s comments.

Nguyen, Ba Nghiep; Simmons, Kevin L.

2013-08-06T23:59:59.000Z

331

Coal combustion science. Quarterly progress report, April 1993--June 1993  

SciTech Connect (OSTI)

This document is a quarterly status report of the Coal Combustion Science Project that is being conducted at the Combustion Research Facility, Sandia National Laboratories. The information reported is for Apr-Jun 1993. The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the PETC Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency Coal Combustion Science Project. The objective of the kinetics and mechanisms of pulverized coal char combustion task is to characterize the combustion behavior of selected US coals under conditions relevant to industrial pulverized coal-fired furnaces. Work is being done in four areas: kinetics of heterogeneous fuel particle populations; char combustion kinetics at high carbon conversion; the role of particle structure and the char formation process in combustion and; unification of the Sandia char combustion data base. This data base on the high temperature reactivities of chars from strategic US coals will permit identification of important fuel-specific trends and development of predictive capabilities for advanced coal combustion systems. The objective of the fate of inorganic material during coal combustion task is the establish a quantitative understanding of the mechanisms and rates of transformation, fragmentation, and deposition of inorganic material during coal combustion as a function of coal type, particle size and temperature, the initial forms and distribution of inorganic species in the unreacted coal, and the local gas temperature and composition. In addition, optical diagnostic capabilities are being developed for in situ, real-time detection of inorganic vapor species and surface species during ash deposition. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

Hardesty, D.R. [ed.

1994-05-01T23:59:59.000Z

332

The Savannah River Site's Groundwater Monitoring Program, third quarter 1991  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

Not Available

1992-02-17T23:59:59.000Z

333

Maximizing Vertical Air on a Quarter Pipe February 14, 2011  

E-Print Network [OSTI]

Maximizing Vertical Air on a Quarter Pipe February 14, 2011 Abstract The current record for maximum vertical air achieved by a snow- boarder on a half pipe is 24 feet and 11 inches. We wish to construct a number of moves. To optimize vertical air we suggest a quarter pipe were incoming velocity and therefore

Morrow, James A.

334

Page 1 of 3 ES&H Quarterly Report  

E-Print Network [OSTI]

Page 1 of 3 ES&H Quarterly Report Directorate: Particle Physics & Astrophysics 3rd Quarter FY ES&H Manual Chapter 33 requirements based on supervisors. Notable trends and followup actions trained in the new the ES&H Manual Chapter 33 walkthrough requirements. The walkthroughs and recording

Wechsler, Risa H.

335

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

336

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

337

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

338

94-1 Research and Development Project Lead Laboratory Support. Status report, April 1, 1996--June 30, 1996  

SciTech Connect (OSTI)

This document reports status and technical progress for Los Alamos 94-1 Research and Development projects concerned with the management of plutonium and plutonium contaminated materials during the third quarter of FY96.

Dinehart, M. [comp.

1996-10-01T23:59:59.000Z

339

Naturally fractured tight gas - gas reservoir detection optimization. Quarterly report, June 1, 1996--September 30, 1996  

SciTech Connect (OSTI)

This document contains the status report for the Naturally Fractured Tight Gas-Gas Reservoir Detection Optimization project for the contract period 9/30/93 to 3/31/97. Data from seismic surveys are analyzed for structural imaging of reflector units. The data were stacked using the new, improved statics and normal moveout velocities. The 3-D basin modeling effort is continuing with code development. The main activities of this quarter were analysis of fluid pressure data, improved sedimentary history, lithologic unit geometry reconstruction algorithm and computer module, and further improvement, verification, and debugging of the basin stress and multi-phase reaction transport module.

Maxwell, J.M.; Ortoleva, P.; Payne, D.; Sibo, W.

1996-11-15T23:59:59.000Z

340

Geothermal direct-heat utilization assistance. Quarterly report, October--December 1996  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-97. It describes 174 contracts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

NONE

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Microbial field pilot study. [Quarterly report], July 1, 1992--September 30, 1992  

SciTech Connect (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot test in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate-reducing bacteria will be stimulated to selectively plug flow paths which have been preferentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. During this quarter an additional tracer study was performed in the field to determine pre-treatment flow paths and the first nutrients were injected. 2 figs.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.

1991-12-06T23:59:59.000Z

342

Microbial field pilot study: Quarterly technical progress report: November 22, 1988--February 28, 1989  

SciTech Connect (OSTI)

The objective of this project is to perform a microbially enhanced oil recovery field test pilot test in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate-reducing bacteria will be stimulated to selectively plug the flow paths which have been preferentially swept by a prior waterflood. This will force future flood water to encounter regions of the reservoir bypassed by the first flood, thereby increasing sweep efficiency. During this quarter studies were made to characterize the in situ bacteria in brine samples recovered from various locations in the SEVVSU. The characteristics of five anaerobic nitrate-using bacteria have been investigated. 2 refs., 4 figs.

Knapp, R.M.; Mcinerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1989-04-05T23:59:59.000Z

343

High flux isotope reactor: Quarterly report October through December 1986  

SciTech Connect (OSTI)

Two routine cycles of operation of the HFIR reactor were completed during the quarter. The shutdowns to end these cycles were both scheduled. The end-of-cycle 287 shutdown was extended indefinitely to investigate the embrittlement of reactor vessel materials due to radiation damage. The reactor remains down at the end of the quarter. Following the scheduled end-of-cycle 287 shutdown period, subsequent shutdown time was designated as unscheduled. The two scheduled shutdowns, fourth quarter downtime resulting from a third quarter scheduled shutdown, and the extended unscheduled shutdown account for the low 44.2% on-stream time for the quarter. The scheduled control plate replacement and vessel internals inspection was completed at the end-of-cycle 287. The inspection revealed a blister on control cylinder 9. This flaw was attributed to a manufacturing defect.

Corbett, B.L.; Farrar, M.B.

1987-04-01T23:59:59.000Z

344

AR and TD Fossil Energy Materials Program. Quarterly progress report for the period ending December 31, 1981  

SciTech Connect (OSTI)

The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology. We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.

Not Available

1982-04-01T23:59:59.000Z

345

Performance indicators, third quarter CY-1991  

SciTech Connect (OSTI)

Secretary of Energy Notice (SEN-29-91) directed that a Department- wide uniform system of Performance Indicators (PI's) for trending and analyzing operational data to help assess and support progress in improving performance and in strengthening line management control of operations relating to environmental safety, and health activities'' be developed. This Performance Indicator Report represents a compilation of data for the third quarter of calendar year 1991 for the following Lawrence Berkeley Laboratory (LBL) facilities: (1) Bevalac, (2) 88-Inch Cyclotron, (3) Materials Sciences Division.

Not Available

1992-01-01T23:59:59.000Z

346

Performance indicators, third quarter CY-1991  

SciTech Connect (OSTI)

Secretary of Energy Notice (SEN-29-91) directed that a Department- wide ``uniform system of Performance Indicators (PI`s) for trending and analyzing operational data to help assess and support progress in improving performance and in strengthening line management control of operations relating to environmental safety, and health activities`` be developed. This Performance Indicator Report represents a compilation of data for the third quarter of calendar year 1991 for the following Lawrence Berkeley Laboratory (LBL) facilities: (1) Bevalac, (2) 88-Inch Cyclotron, (3) Materials Sciences Division.

Not Available

1992-01-01T23:59:59.000Z

347

Electric Power Quarterly, April-June 1986  

SciTech Connect (OSTI)

In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis. The report also presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on the Form IE-417.

Not Available

1986-10-28T23:59:59.000Z

348

Electric power quarterly, January-March 1987  

SciTech Connect (OSTI)

In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis. The report also presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on the Form IE-417.

Not Available

1987-07-27T23:59:59.000Z

349

Electric power quarterly, October-December 1986  

SciTech Connect (OSTI)

In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis. The report also presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on the Form IE-417.

Not Available

1987-04-08T23:59:59.000Z

350

Tulane/Xavier University hazardous materials in aquatic environments of the Mississippi River basin. Quarterly progress report, January 1--March 31, 1996  

SciTech Connect (OSTI)

The objectives of this report are to provide the necessary administrative support to assure that the scientific and educational goals of the project are obtained and to assure that all Department of Energy reporting requirements and requests are fulfilled. The grant reporting is divided into three aspects: Collaborative Cluster projects, Initiation projects and Education projects. A cluster project is one or more closely related collaborative, multidisciplinary research projects in which a group of investigators employs a synergistic approach to the solution of problems in the same general area of research. The accomplishments this quarter of eleven cluster projects are presented. An initial project typically involves a single investigator. The purpose of the project is to undertake pilot work, lasting no more than one year, which will lead to the successful submission of an externally-funded proposal or the development of a collaborative cluster project. The accomplishments this quarter of eleven initiation projects are presented. The education projects are designed to develop courses with emphasis on environmental studies and/or to train students in areas of environmental research.

NONE

1996-05-17T23:59:59.000Z

351

Tribopolymerization as an anti-wear mechanism. Quarterly progress report  

SciTech Connect (OSTI)

The primary objective of this activity is to obtain the necessary data which would enhance, promote, and encourage the introduction of advanced lubrication technology into the marketplace. This includes (a) defining specific but different applications, (b) establishing the limits or ranges of applied loads, speeds, and temperatures over which the concept of tribopolymerization would work in reducing wear and/or friction, (c) continuing in efforts to understand the film-forming process (this rates to (b) above), using this knowledge to develop new and even more effective additives, and (d) exploring possible connections with private and investment companies for the licensing and marketing of products which will reduce friction and wear in a variety of applications. Progress was made in several different but connected areas. These included (a) establishing of load/velocity limits of selected monomers for ceramic lubrication, (b) the discovery of new and effective monomers designed for higher temperature anti-wear applications, (c) improvements and modifications of the high load/high speed pin-on-disk machine, (d) the initiation of related or spin-off projects designed to get their advanced technology into the marketplace, (e) the filing of three new patent applications, and (f) collaborative research with Dr. Kajdas--the co-inventor with Dr. Furey--on tribopolymerization as a novel and effective approach to the boundary lubrication of ceramics and steel. These and other elements of progress made during the first Quarter of 1996 are discussed briefly.

Furey, M.J.

1996-04-01T23:59:59.000Z

352

Power Systems Development Facility. Quarterly report, January--March 1996  

SciTech Connect (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particular control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the Foster Wheeler portion of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDs) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter.

NONE

1996-05-01T23:59:59.000Z

353

Performance indicators for third quarter, CY 1993  

SciTech Connect (OSTI)

The Department of Energy (DOE) has established a Department-wide Performance Indicator (PI) Program for trending and analysis of operational data as directed by DOE Order 5480.26. The Pl Program was established to provide a means for monitoring the environment safety, and health (ES&H) performance of the DOE at the Secretary and other management levels. This is the eleventh in a series of quarterly reports generated for the Department of Energy Idaho Operations Office (DOE-ID) by EG&G Idaho, Inc. The information in this eleventh quarterly report, while contributing to a historical database for supporting future trending analysis, does not at this time provide a sound basis for developing trend-related conclusions. In the future, it is expected that trending and analysis of operational data will enhance the safety culture In both DOE and contractor organizations by providing an early warning of deteriorating environmental, safety, and health conditions. DOE-STD-1048-92 identifies four general areas of Pls. They are: Personnel Safety, Opperational Incidents, Environment, Management. These four areas have been subdivided into 28 performance indicators. Approximately 115 performance indicator control and distribution charts comprise the body of this report. A brief summary of Pls contained in each of these general areas is provided in each of these general areas is provided.

Groh, M.

1993-12-31T23:59:59.000Z

354

Power systems development facility. Quarterly report, October 1--December 31, 1996  

SciTech Connect (OSTI)

This quarterly technical progress report summarizes the work completed during the fourth ID quarter, October 1 through December 31, 1996, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled {open_quotes}Hot Gas Cleanup Test Facility for ID Gasification and Pressurized Combustion.{close_quotes} The objective of this project, herein referred to as the Power Systems Development Facility (PSDF), is to evaluate hot gas particle control technologies Using coal-derived gas streams. This project entails the design, construction, installation, and use of a flexible test facility which can operate under realistic Gasification and combustion conditions. The major particulate control device (PCD) issues to be addressed include the integration of the PCDs into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. During this quarter considerable effort was expended in finalizing drawings and technical information for bid packages in support of the Request for Quotation (RFQ) for the fixed-price construction of the Foster Wheeler train. The packages were finalized and released for bids from seven companies at the beginning of November. A prebid meeting as held in mid-November when representatives from the interested companies toured the site and sought clarification on certain issues. Six bids were received by the end of December. Discussions were also held with a number of labor brokers to provide construction Support. Their bids are being evaluated in conjunction with those for the RFQ.

NONE

1997-05-01T23:59:59.000Z

355

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

356

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

357

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

358

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

359

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

360

Production and screening of carbon products precursors from coal. Quarterly progress report, July 1, 1996--September 30, 1996  

SciTech Connect (OSTI)

This quarterly report covers activities during the period from July 1, 1996 through September 30, 1996 on the development of carbon products precursor materials from coal. The first year of the project ended in February, 1996; however, the WVU research effort continued through August 14, 1997 on a no-cost extension of the original contract. PETC chose to exercise the option for continuation of the projects and $100,000 became available on August 9, 1996. The objective for year two is to focus on development of those carbon products from coal-based solvent extract precursors which have the greatest possibility for commercial success.

Zondlo, J.; Stiller, A.

1996-10-25T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

High efficiency shale oil recovery. Fourth quarterly report, October 1, 1992--December 31, 1992  

SciTech Connect (OSTI)

The overall project objective is to demonstrate the high efficiency of the Adams Counter-Current shale oil recovery process. The efficiency will first be demonstrated on a small scale, in the current phase, after which the demonstration will be extended to the operation of a small pilot plant. Thus the immediate project objective is to obtain data on oil shale retorting operations in a small batch rotary kiln that will be representative of operations in the proposed continuous process pilot plant. Although an oil shale batch sample is sealed in the batch kiln from the start until the end of the run, the process conditions for the batch are the same as the conditions that an element of oil shale would encounter in a continuous process kiln. Similar chemical and physical (heating, mixing) conditions exist in both systems. The two most important data objectives in this phase of the project are to demonstrate (1) that the heat recovery projected for this project is reasonable and (2) that an oil shale kiln will run well and not plug up due to sticking and agglomeration. The following was completed and is reported on this quarter: (1) A software routine was written to eliminate intermittently inaccurate temperature readings. (2) We completed the quartz sand calibration runs, resolving calibration questions from the 3rd quarter. (3) We also made low temperature retorting runs to identify the need for certain kiln modifications and kiln modifications were completed. (4) Heat Conductance data on two Pyrolysis runs were completed on two samples of Occidental oil shale.

Adams, D.C.

1992-12-31T23:59:59.000Z

362

Natural gas imports and exports, fourth quarter report 1999  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-03-01T23:59:59.000Z

363

Natural gas imports and exports, first quarter report 2000  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-06-01T23:59:59.000Z

364

Electric Power Quarterly, October-December 1985. [Glossary  

SciTech Connect (OSTI)

The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. Data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1986-05-05T23:59:59.000Z

365

Natural gas imports and exports, third quarter report 2000  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-12-01T23:59:59.000Z

366

Power Systems Development Facility. Quarterly report, July 1--September 30, 1996  

SciTech Connect (OSTI)

This quarterly technical progress report summarizes the work completed during the third quarter of a project entitled Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion. The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phase expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

NONE

1996-12-31T23:59:59.000Z

367

Performance indicators for first quarter CY 1994  

SciTech Connect (OSTI)

The Department of Energy (DOE) has established a Department-Wide Performance Indicator (PI) Program for trending and analysis of operational data as directed by DOE Order 5480.26. The PI Program was established to provide a means for monitoring the environment safety, and health (ES&H) performance of the DOE at the Secretary and other management levels. This is the thirteenth in a series of quarterly reports generated for the Department of Energy Idaho Operations Office (DOE-ID) by EG&G Idaho, Inc., to meet the requirements of the PI Program as directed by the DOE Standard (DOE-STD-1048-92). The report format and content adhere to the guidelines established In DOE Order 5480.26, Trending and Analysis of Operations Information Using Performance Indicators, and DOE-STD-1048-92, DOE Peformance Indicators Guidance Document.

Not Available

1994-11-01T23:59:59.000Z

368

Interventions into old residential quarters : the case of Shahjahanabad  

E-Print Network [OSTI]

The thesis develops design guidelines for interventions into residential quarters of the old core cities in the Third World. Their purpose is to provide a suitable framework for developing residential designs maintaining ...

Badshah, Akhtar

1983-01-01T23:59:59.000Z

369

OE Releases 2014 Issue 2 of Energy Emergency Preparedness Quarterly...  

Office of Environmental Management (EM)

2014) August 7, 2014 - 3:16pm Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released Volume 3, Issue 2 of the Energy Emergency Preparedness Quarterly...

370

OE Releases Second Issue of Energy Emergency Preparedness Quarterly...  

Office of Environmental Management (EM)

2012) April 12, 2012 - 3:55pm Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released the second issue of the Energy Emergency Preparedness Quarterly...

371

OE Releases 2013 Issue 2 of Energy Emergency Preparedness Quarterly...  

Office of Environmental Management (EM)

2013) May 17, 2013 - 11:09am Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released Volume 2, Issue 2 of the Energy Emergency Preparedness Quarterly...

372

US energy industry financial developments, 1993 first quarter  

SciTech Connect (OSTI)

Net income for 259 energy companies-- including, 20 major US petroleum companies-- rose 38 percent between the first quarter of 1992 and the first quarter of 1993. An increased level of economic activity, along with colder weather, helped lift the demand for natural gas. crude oil, coal, and electricity. The sharp rise in the domestic price of natural gas at the wellhead relative to the year-ago quarter was the most significant development in US energy during the first quarter. As a consequence of higher natural gas prices, the upstream segment of the petroleum industry reported large gains in income, while downstream income rose due to higher refined product demand. Increased economic activity and higher weather-related natural gas demand also led to improvements in income for the rate-regulated energy segment. However, declining domestic oil production continued to restrain upstream petroleum industry earnings growth, despite a moderate rise in crude oil prices.

Not Available

1993-06-25T23:59:59.000Z

373

TA Position Available Fall Quarter 2014 Immediate Opening  

E-Print Network [OSTI]

in the development of course and workshop content and materials · Assist with the identification, invitationTA Position Available ­ Fall Quarter 2014 Immediate Opening Career Transitions with facilitation of panel/group discussions · Prepare and distribute marketing materials to departments

Bogyo, Matthew

374

OE Releases Third Issue of Energy Emergency Preparedness Quarterly...  

Office of Environmental Management (EM)

Preparedness Quarterly (July 2012) July 13, 2012 - 12:45pm Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released the third issue of the Energy...

375

Natural gas imports and exports: Third quarter report, 1998  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the third quarter of 1998 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent calendar quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

376

Natural gas imports and exports. First quarter report, 1998  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the first quarter of 1998 (January through March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-08-01T23:59:59.000Z

377

Natural gas imports and exports. Second quarter report, 1998  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepared quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1998 (April through June). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-11-01T23:59:59.000Z

378

Natural gas imports and exports. Fourth quarter report, 1998  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

379

Microsoft Project - ops_121414.mpp  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fundProject QuarterlyDepartmentConducting basicThis1 !ID Task

380

Observations from The EV Project in Q4 2013  

SciTech Connect (OSTI)

This is a summary report for The EV Project 4th quarter 2013 reports. It describes electric vehicle driver driving and charging behavior observed in Q4. It is the same report as the previously approved/published Q3 2013 report, only the numbers have been updated. It is for public release and does not have limited distribution.

John Smart

2014-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report. First quarter 1995  

SciTech Connect (OSTI)

During first quarter 1995, samples from AMB groundwater monitoring wells at the Metallurgical Laboratory Hazardous Waste Management Facility (Met Lab HWMF) were analyzed for selected heavy metals, field measurements, radionuclides, volatile organic compounds, and other constituents. Six parameters exceeded standards during the quarter. As in previous quarters, tetrachloroethylene and trichloroethylene exceeded final Primary Drinking Water Standards (PDWS). Total organic halogens exceeded its Savannah River Site (SRS) Flag 2 criterion during first quarter 1995 as in fourth quarter 1994. Aluminum, iron, and manganese, which were not analyzed for during fourth quarter 1994, exceeded the Flag 2 criteria in at least two wells each during first quarter 1995. Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting the determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Unit were also similar to previous quarters.

NONE

1995-06-01T23:59:59.000Z

382

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

383

Client Project Job No Exeter College Ruskin College, Oxford CG/8069  

E-Print Network [OSTI]

through underlying deep gravels causes drop in water level. West East Gravels ­ permeability typically 10eFIGURES #12;Client Project Job No Exeter College Ruskin College, Oxford CG/8069 Title Site location Observational Quarter #12;#12;Client Project Job No Exeter College Ruskin College, Oxford CG/8069 Title

Flynn, E. Victor

384

Hot Gas Cleanup Test Facility for gasification and pressurized combustion. Quarterly report, October--December 1994  

SciTech Connect (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs. Substantial progress in underground construction activities was achieved during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. MWK equipment at the grade level and the first tier are being set in the structure.

NONE

1995-02-01T23:59:59.000Z

385

Improved oil recovery in fluvial dominated deltaic reservoirs of Kansas - near-term. Quarterly report, April 1 - June 30, 1996  

SciTech Connect (OSTI)

The objective of this project is to address waterflood problems of the type found in Morrow sandstone reservoirs in southwestern Kansas and Cherokee Group reservoirs in southeastern Kansas. Two demonstration sites, Stewart Field, and Savonburg Field, operated by different independent oil operators are involved in this project. General topics to be addressed are: (1) reservoir management and performance evaluation; (2) waterflood optimization; and (3) the demonstration of recovery processes involving off-the-shelf technologies which can be used to enhance waterflood recovery, increase reserves, and reduce the abandonment rate of these reservoir types. For the Stewart Field project, work is summarized for the last quarter on waterflood operations and reservoir management. For the Savonburg Field project, work on water plant development, and pattern changes and wellbore cleanup are briefly described.

Green, D.W.; Willhite, G.P.; Walton, A.; Schoeling, L.; Reynolds, R.; Michnick, M.; Watney, L.

1996-07-01T23:59:59.000Z

386

Power Systems Development Facility. Quarterly report, July--September 1995  

SciTech Connect (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a fimction of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and hot gas cleanup units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDS) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter. Delivery and construction of the process structural steel is nearing completion. Nearly all equipment are set in its place and the FW equipment and the PCDs are being set in the structure.

NONE

1995-11-01T23:59:59.000Z

387

Energy Emergency Energy Emergency Preparedness Quarterly Preparedness...  

Broader source: Energy.gov (indexed) [DOE]

power source. The pilot project not only involves the instrumentation of a number of health care-related facilities, but also the development of methods for alerting the...

388

Lessons Learned Quarterly Report, December 1998 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Las Vegas Managing Baseline Environmental Information for the Sandia Site-wide EIS Water Project Mini-guidance Regulatory Compliance and NEPA Procedures for an Environmental...

389

Treatment of metal-laden hazardous wastes with advanced clean coal technology by-products. Quarterly report, May 1995--August 1995  

SciTech Connect (OSTI)

This fourth quarterly report describes work done during the fourth three-month period of the University of Pittsburgh`s project on the {open_quotes}Treatment of Metal-Laden Hazardous Wastes with Advanced Clean Coal Technology By-Products.{close_quote} Participating with the university on this project are Dravo Lime Company, Mill Service, Inc., and the Center for Hazardous Materials Research. This report describes the activities of the project team during the reporting period. The principal work has focussed upon the production of six sets of samples with high water content for solidification testing and the mixing of five dry samples for solidification testing by the Proctor method. Twenty-eight day compressive strengths are reported for five of the six sets of samples with high water content. The report also discusses completion of the format of the database and the inclusion in it of all data collected to date. Special reports presented during the quarter include the Continuation Application, a News Release, and modification to the Test Plan. Work is progressing on the NEPA report and the Topical Report. The activity on the project during the fourth quarter of Phase one, as presented in the following sections, has fallen into six major areas: (1) Completion of by-product evaluations, (2) Completion of analyses of six wastes, (3) Initiation of eleven solidification tests, (4) Continued extraction and extract analysis of solidified samples, (5) Development of the database, and (6) Production of reports.

NONE

1995-11-01T23:59:59.000Z

390

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

391

Decontamination systems information and research programs. Quarterly report, July 1--August 31, 1996  

SciTech Connect (OSTI)

The US contains numerous hazardous waste sites. Many sites are on private land near operating units of various companies. An effort is being made to determine the conditions under which such sites can be remediated voluntarily. The objective of the project will be to first assess the interest and willingness of industry in the Kanawha River Valley, WV to participate in discussions that would lead toward voluntary cleanup activities. The second will be to implement the activities agreed upon by the interested parties. The project will first involve individual discussions with the industrial, government, and other organized groups in the area. These discussions will help determine the feasibility of organizing voluntary efforts. If the discussions indicate that conditions may be favorable for developing individual or group voluntary cleanup projects, a working group will be convened to establish the environmental goals of the project as well as the technical approach for achieving those goals. The projects for the 1996 WVU Cooperative Agreement are categorized into three task focus areas: Task 1.0 Contaminant Plume Containment and Remediation, Task 2.0 Cross Cutting Innovative Technologies, and Task 3.0 Small Business Support Program. Summaries of the accomplishments for the subtasks reporting under these categories during the third quarter, 1 July 96 through 30 September 96, are presented.

NONE

1997-07-01T23:59:59.000Z

392

Treatment of metal-laden hazardous wastes with advanced clean coal technology by-products. Quarterly report, September 1995--December 1995  

SciTech Connect (OSTI)

This fifth quarterly report describes work done during the fifth three-month period of the University of Pittsburgh`s project on the {open_quotes}Treatment of Metal-Laden Hazardous Wastes with Advanced Clean Coal Technology By-Products.{close_quotes} Participating with the university on this project is Mill Service, Inc. This report describes the activities of the project team during the reporting period. The principal work has focussed upon completing laboratory evaluation of samples produced during Phase 1, preparing reports and presentations, and seeking environmental approvals and variances to permits that will allow the field work to proceed. The compressive strength of prepared concretes is described.

NONE

1996-03-01T23:59:59.000Z

393

Computational mechanics research and support for aerodynamics and hydraulics at TFHRC. Quarterly report January through March 2011. Year 1 Quarter 2 progress report.  

SciTech Connect (OSTI)

This project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at the Turner-Fairbank Highway Research Center for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of January through March 2011.

Lottes, S. A.; Kulak, R. F.; Bojanowski, C. (Energy Systems)

2011-05-19T23:59:59.000Z

394

Biomass power for rural development. Quarterly report, April 3--July 1, 1998  

SciTech Connect (OSTI)

In this quarter a large amount of time was spent doing project planning and budget preparation for the fiscal years 1998 and 1999. Many issues of long-term strategic planning and budgeting depend on the availability of Federal support, including financial, technical and political. It has become increasingly obvious that several significant barriers must be overcome in order to reach the final goal of commercial replication of the technology. Technical barriers include the designing of a cost effective harvest, storage, transport, process and conversion system. While farmers in this region have many decades of experience in harvest, storage and transport of grass, switchgrass presents new challenges due to the harvest requirements and the switchgrass yield potential. The author has identified two locations in the United States that have similar material handling situations, one site in Minnesota the other in Oregon. He has visited the Minnesota site in order to learn from their experience and they may visit the Oregon site in the future. The processing technology remains in a stage of development. As he grows closer to the time for a test co-fire he is beginning to include additional test objectives which individually seem minor, but when taken together provide drivers which impact overall machinery requirement decisions. The next quarter will provide additional levels of detail. This report describes progress in switchgrass conversion development, production activities, environmental analysis planning, and information and education activities.

Cooper, J.T.

1998-10-01T23:59:59.000Z

395

Quarterly report of RCRA groundwater monitoring data for period October 1, 1992--December 31, 1992  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 CFR 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. Long-term laboratory contracts were approved on October 22, 1991. DataChem Laboratories of Salt Lake City, Utah, performs the hazardous chemicals analyses for the Hanford Site. Analyses for coliform bacteria are performed by Columbia/Biomedical Laboratories and for dioxin by TMS Analytical Services, Inc. International Technology Analytical Services Richland, Washington performs the radiochemical analyses. This quarterly report contains data that were received prior to March 8, 1993. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

Not Available

1993-04-01T23:59:59.000Z

396

Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994  

SciTech Connect (OSTI)

West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation of chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.

Not Available

1994-05-01T23:59:59.000Z

397

RESULTS FOR THE THIRD QUARTER 2007 TANK 50H WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS  

SciTech Connect (OSTI)

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low activity wastewater streams from the Effluent Treatment Project (ETP), H-Canyon, and the high level waste (HLW) storage tanks, are stored as a mixture in Tank 50H until it can be pumped to the Saltstone Facility for treatment and disposal. Specific waste acceptance criteria (WAC) must be met for the transfer of low-level aqueous waste from Tank 50H to the Saltstone Facility. Low level waste which meets the WAC can be transferred, stored and treated in the Saltstone Production Facility (SPF) for subsequent disposal as saltstone in the Saltstone Disposal Facility (SDF). Waste Solidification Engineering (WSE) has requested through a Technical Task Request (TTR) that the Savannah River National Laboratory (SRNL) measure the concentrations of chemical and radionuclide contaminants listed in the currently approved Saltstone Waste Acceptance Criteria (WAC). A Task Technical and Quality Assurance Plan and Analytical Study Plan has been written for this request. WAC determinations are needed on a quarterly basis for chemical contaminants and every first and third quarter for radioactive contaminants. This memorandum presents the results for the chemical and radionuclide contaminants in the third quarter, from the samples taken from Tank 50 in September, 2007.

Zeigler, K; Ned Bibler, N

2008-07-11T23:59:59.000Z

398

Oil Bypass Filter Technology Evaluation Tenth Quarterly Report January–March 2005  

SciTech Connect (OSTI)

This Oil Bypass Filter Technology Evaluation quarterly report (January– March 2005) details the ongoing fleet evaluation of oil bypass filter technologies being conducted by the Idaho National Laboratory (INL) for the U.S. Department of Energy’s FreedomCAR & Vehicle Technologies Program. Eleven INL fourcycle diesel-engine buses and six INL Chevrolet Tahoes with gasoline engines are equipped with oil bypass filter systems. Eight of the buses and the six Tahoes are equipped with oil bypass filters from the puraDYN Corporation; the remaining three buses are equipped with oil bypass filters from Refined Global Solutions. Both the puraDYN and Refined Global Solutions bypass filters have a heating chamber to remove liquid contaminates from the oil. During the January to March 2005 reporting quarter, the eleven diesel engine buses traveled 97,943 miles. As of March 31, 2005, the buses had accumulated 744,059 total test miles. During this quarter, four regularly scheduled 12,000-mile bus servicings were performed. The full-flow and bypass oil filters were changed and oil analysis samples were taken for the four buses. Bus 73446 had its oil changed due to a low total base number value. Bus 73450 had a major engine failure at the beginning of the quarter when one of its pushrods and valves were damaged. Buses 73432 and 73433 were removed from the bypass filter evaluation project and placed into the INL Diesel Engine Idling Wear-Rate Evaluation Test. While a total of nine oil changes on the INL buses occurred during the past 29 months, 53 oil changes have been avoided by using the oil bypass filters. The 53 avoided oil changes equates to 1,855 quarts (464 gallons) of new oil not consumed and 1,855 quarts of waste oil not generated. Therefore, over 85% of the oil normally required for oil-changes was not used, and, consequently, the evaluation achieved a greater than 85% reduction in the amount of waste oil normally generated by the buses. The six Tahoe test vehicles traveled 40,700 miles, and as of March 31, 2005, the Tahoes had accumulated 231,428 total test miles.

Larry Ziker; James Francfort

2005-06-01T23:59:59.000Z

399

OE Releases 2013 Issue 2 of Energy Emergency Preparedness Quarterly (April 2013)  

Broader source: Energy.gov [DOE]

The Office of Electricity Delivery and Energy Reliability (OE) has released Volume 2, Issue 2 of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter.

400

OE Releases Second Issue of Energy Emergency Preparedness Quarterly (April 2012)  

Broader source: Energy.gov [DOE]

The Office of Electricity Delivery and Energy Reliability (OE) has released the second issue of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter.

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Natural gas imports and exports. First quarter report 1994  

SciTech Connect (OSTI)

The Office of Fuels Programs Prepares quarterly reports Summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the first quarter of 1994 (January--March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During the first three months of 1994, data indicates that gas imports grew by about 14 percent over the level of the first quarter of 1993 (668 vs. 586 Bcf), with Canadian and Algerian imports increasing by 12 and 53 percent, respectively. During the same time period, exports declined by 15 percent (41 vs. 48 Bcf). Exports to Canada increased by 10 percent from the 1993 level (22 vs. 20 Bcf) and exports to Mexico decreased by 64 percent (5 vs. 14 Bcf).

Not Available

1994-08-01T23:59:59.000Z

402

The Savannah River Site's Groundwater Monitoring Program, second quarter 1990  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

Not Available

1991-02-07T23:59:59.000Z

403

The Savannah River Site's Groundwater Monitoring Program, second quarter 1989  

SciTech Connect (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

404

Mixed Waste Management Facility groundwater monitoring report, First quarter 1994  

SciTech Connect (OSTI)

During first quarter 1994, nine constituents exceeded final Primary Drinking Water Standards in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility, the Old Burial Ground, the E-Area Vaults, the proposed Hazardous Waste/Mixed Waste Disposal Vaults, and the F-Area Sewage Sludge Application Site. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. Chloroethene (vinyl chloride), copper, 1,1-dichloroethylene, lead, mercury, nonvolatile beta, or tetrachloroethylene also exceeded standards in one or more wells. Elevated constituents were found in numerous Aquifer Zone IIB{sub 2} (Water Table) and Aquifer Zone IIB{sub 1}, (Barnwell/McBean) wells and in one Aquifer Unit IIA (Congaree) well. The groundwater flow directions and rates in the three hydrostratigraphic units were similar to those of previous quarters.

Not Available

1994-06-01T23:59:59.000Z

405

The Savannah River Site's Groundwater Monitoring Program, first quarter 1989  

SciTech Connect (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

406

The Savannah River Site's Groundwater Monitoring Program, third quarter 1989  

SciTech Connect (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

407

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

408

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

409

Coal log pipeline research at University of Missouri. 1. quarterly report for 1996, January 1--March 31, 1996  

SciTech Connect (OSTI)

This project consists of the following nine tasks: Machine design for coal log fabrication; Very rapid compaction of coal logs; Rapid compaction of coal logs; Fast-track experiments on coal log compaction; Coal log fabrication using hydrophobic binders; Drag reduction in large diameter hydraulic capsule pipeline; Automatic control of coal log pipeline system; Hydraulics of CLP (Coal Log Pipeline); and Coal heating system research. The purpose of the task, the work accomplished during this report period, and work proposed for the next quarter are described for each task.

NONE

1996-07-01T23:59:59.000Z

410

AFBC co-firing of coal and hospital waste: Quarterly report, 1 May 1996-31 July, 1996  

SciTech Connect (OSTI)

The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. This quarterly report describes activities completed in the design, procure, install and start-up phase.

Stuart, J.M.

1996-12-31T23:59:59.000Z

411

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Fourth Quarter 1983  

SciTech Connect (OSTI)

At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small power production projects was 305, with a total estimated nominal capacity of 2,389 MW. Of these totals, 202 projects, capable of producing 566 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration, solid waste, or biomass projects had signed 101 contracts with a potential of 1,408 MW. In total, 106 contracts and letter agreements had been signed with projects capable of producing 1,479 MW. PG and E also had under active discussion 29 cogeneration projects that could generate a total of 402 MW to 444 MW, and 13 solid waste or biomass projects with a potential of 84 MW to 89 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 28, with a generating capability of 618 MW. Also, discussions were being conducted with 14 wind farm projects, totaling 365 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 8 other small wind projects under active discussion. There were 59 hydroelectric projects with signed contracts and a potential of 146 MW, as well as 72 projects under active discussion for 169 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E was planning to construct. Table B displays the above information. In tabular form, in Appendix A, are status reports of the projects as of December 31, 1983.

None

1983-01-01T23:59:59.000Z

412

INL FY2014 1st Quarterly Performance Analysis  

SciTech Connect (OSTI)

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 76 occurrence reports and over 16 other deficiency reports (including not reportable events) identified at the INL during the period of October 2013 through December 2013. Battelle Energy Alliance (BEA) operates the INL under contract DE AC 07 051D14517

Loran Kinghorn

2014-07-01T23:59:59.000Z

413

Co-firing high sulfur coal with refuse derived fuels. Quarterly report, October - December 1996  

SciTech Connect (OSTI)

The objectives of this quarter of study on the co-firing of high sulfur coal with refuse derived fuels project were two-fold. First, the effect of S0{sub 2} on the formation of chlorine during combustion processes was examined. To simulate the conditions used in the AFBC system, experiments were conducted in a quartz tube in an electrically heated furnace. The principle analytical technique used for identification of the products from this study was GC/MS. The evolved gas was trapped by an absorbent and analyzed with a GC/MS system. The preliminary results indicate an inhibiting effect of S0{sub 2} on the Deacon Reaction. Secondly, information on the evolution of chlorine, sulfur and organic compounds from coals 95031 and 95011 were studied with the AFBC system. 2 figs., 1 tab.

Pan, W.-P.; Riley, J.T.; Lloyd, W.G.

1996-12-01T23:59:59.000Z

414

Improved recovery demonstration for Williston Basin carbonates. Quarterly report, July 1 - September 30, 1996  

SciTech Connect (OSTI)

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in- place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing 3-dimensional (3D) and multi-component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. Field demonstrations are in progress to collect data for evaluation of horizontal completions in both the Red River and Ratcliffe. A vertical well in the Red River will test attribute analysis of 3D seismic data for prediction of porosity development. Additional seismic acquisitions and interpretation are in progress for both the Ratcliffe and Red River. A water-injectivity test in a new horizontal completion in the Red Rive B zone at Buffalo Field is scheduled for next quarter.

Carrell, L.A.

1996-12-31T23:59:59.000Z

415

Geothermal direct-heat utilization assistance. Quarterly report, January - March 1997  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-97. It describes 176 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on well pumping in commercial groundwater heat pump systems. A memorandum of understanding between the GHC and EIA is described. Work accomplishments on the Guidebook are discussed. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1997-04-01T23:59:59.000Z

416

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

417

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

418

RP-5 RENEWABLE ENERGY PROJECT  

SciTech Connect (OSTI)

This is the second quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of October 1, 2002 to December 31, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted in order to follow up on potential renewable energy technologies that were identified in the previous report; the technologies were analyzed for their feasibility, suitability and cost effectiveness for this project. This report covers the one-day conceptual design kickoff meeting that took place on November 4, 2002. The meeting was held to discuss the practicality and implementation of potential innovative technologies. Following the kickoff meeting, Inland Empire Utilities Agency (IEUA) and CH2M Hill, the Public Interest Energy Research (PIER) Consultant, held a meeting on December 2, 2002 to discuss the Conceptual Design Report outline and contents in order to clearly present each selected technology along with its evaluation, cost effectiveness and justification. A conference call also took place between the PIER Consultant and IEUA on December 13, 2002, to discuss the overall scope of work for this project. Major project activities in this period include expanded discussions on previous Energy Charrette decisions and recommendations, conceptual design kickoff meeting, conceptual design report, and deciding on the overall project scope of work.

Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

2003-01-30T23:59:59.000Z

419

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

420

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

422

The Quarterly Review of Economics and Finance 44 (2004) 751767  

E-Print Network [OSTI]

: tmalessa@syr.edu (T.M. Alessandri), DavidFord@tamu.edu (D.N. Ford), d.lander@snhu.edu (D.M. Lander.M. Alessandri et al. / The Quarterly Review of Economics and Finance 44 (2004) 751­767 JEL classification: D8; D of shareholder wealth (Alessandri, Lander, & Bettis, 2002; Bettis, 1983; Kester, 1984; Myers, 1984

Ford, David N.

2004-01-01T23:59:59.000Z

423

Ocean thermal energy. Quarterly report, October-December 1981  

SciTech Connect (OSTI)

This quarterly report summarizes work on the following tasks: OTEC methanol; approaches for financing OTEC proof-of-concept experimental vessels; investigation of OTEC-ammonia as an alternative fuel; review of electrolyzer development programs and requirements; hybrid geothermal-OTEC power plants: single-cycle performance; estimates; and hybrid geothermal-OTEC power plants: dual-cycle performance estimates.

Not Available

1981-12-30T23:59:59.000Z

424

High Flux Isotope Reactor quarterly report, January-March 1986  

SciTech Connect (OSTI)

Four routine cycles of operation were completed during the first quarter. Four scheduled end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 86.9%. An unscheduled control plate and control cylinder replacement was performed after tantalum contamination in the primary coolant system was traced to the inner cylinder.

Corbett, B.L.; Farrar, M.B.

1986-06-01T23:59:59.000Z

425

Name: Intended quarter of entry: Academic Planning Worksheet for Philosophy  

E-Print Network [OSTI]

Name: Intended quarter of entry: Academic Planning Worksheet for Philosophy This worksheet-Year College Courses: Introductory courses in symbolic logic, social philosophy, major problems of philosophy, and history of philosophy. Courses to develop writing skills, as well as language courses, especially Greek

Queitsch, Christine

426

CANADIAN METALLURGICAL QUARTERLY HOT WORKABILITY OF 2304 AND 2205 DUPLEX  

E-Print Network [OSTI]

339 CANADIAN METALLURGICAL QUARTERLY HOT WORKABILITY OF 2304 AND 2205 DUPLEX STAINLESS STEELS E, 2002; in revised form December, 2003) Abstract -- The duplex stainless steels 2304 and 2205 were that the hot workability of 2304 and 2205 duplex stainless steels can be improved modestly by multistage

Niewczas, Marek

427

VOL I, ISSUE 1Quarterly Edition Population and Public Policy  

E-Print Network [OSTI]

VOL I, ISSUE 1Quarterly Edition Population and Public Policy Migration to western Canada increases affect and are affected by public policy decisions. Even the sheer size of the population, the subject of this article, affects public policy because larger populations can usually support a wider range of public

Saskatchewan, University of

428

Medical and Health Divisions quarterly report, July, August, September, 1948  

SciTech Connect (OSTI)

This quarterly report describes progress in four programs entitled (1) The Metabolic Properties of Plutonium and Allied Materials, (2) Biological Studies of Radiation Effects, (3) Biological Effects of Radiation from External and Internal Sources and (4) Health Chemistry and Physics. Progress in each program is separately indexed and abstracted for the database.

NONE

1995-11-01T23:59:59.000Z

429

Texas Tech University Energy Conservation Plan -Quarterly Update  

E-Print Network [OSTI]

Texas Tech University Energy Conservation Plan - Quarterly Update April 2006 Executive Order RP-49 from the Governor's Office requires each state agency to develop an energy conservation plan and set Plan, reporting to the State Energy Conservation Office (SECO) is the two-year energy reduction goal

Gelfond, Michael

430

assessment program quarterly: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

assessment program quarterly First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Welcome to the USGS NAWQA...

431

Natural gas imports and exports; Fourth quarterly report, 1993  

SciTech Connect (OSTI)

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the fourth quarter of 1993 (October--December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During 1993, data indicates gas imports grew by about 10 percent over the 1992 level (2328 vs. 2122 Bcf), with Canadian and Algerian imports increasing by 8 and 82 percent, respectively. During the same time period, exports declined by 41 percent (144 vs. 243 Bcf). Exports to Canada decreased 47 percent from the 1992 level (50 vs. 95 Bcf) and exports to Mexico decreased by 60 percent (38 vs. 95 Bcf).

NONE

1993-12-31T23:59:59.000Z

432

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base ...

rroames

2010-01-12T23:59:59.000Z

433

QUARTERLY ECONOMIC COMMENTARY Vol 30 No 2  

E-Print Network [OSTI]

' was not present in the UK and was present in three key sectors: other services, business services & real estate to forecast weaker Scottish growth in 2005 compared to 2004. For our central forecast, we are projecting Scottish GDP growth of 1.8% in 2005, 1.8% in 2006 and 2% in 2007. On the basis of the present published

Mottram, Nigel

434

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ FFA Quarterly Report:

435

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ FFA Quarterly Report:09

436

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ FFA Quarterly Report:091

437

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ FFA Quarterly

438

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ FFA QuarterlyJuly

439

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ FFA QuarterlyJuly31,

440

National Institute for Petroleum and Energy Research quarterly technical report, January 1--March 31, 1993  

SciTech Connect (OSTI)

Accomplishments for the past quarter are briefly described for the following tasks: chemical flooding -- supporting research; gas displacement -- supporting research; thermal recovery -- supporting research; geoscience technology; resource assessment technology; and microbial technology. Chemical flooding covers: surfactant flooding methods; development of improved alkaline flooding methods; mobility control and sweep improvement in chemical flooding; and surfactant-enhanced alkaline flooding field project. Gas displacement covers: gas flooding performance prediction improvement; and mobility control, profile modification and sweep improvement in gas flooding. Thermal recovery includes: thermal processes for light oil recovery; thermal processes for heavy oil recovery; and feasibility study of heavy oil recovery in the mid-continent region -- Oklahoma, Kansas, and Missouri; simulation analysis of steam-foam projects; and field application of foams for oil production symposium. Geoscience technology covers: three-phase relative permeability; and imaging techniques applied to the study of fluids in porous media. Resource assessment technology includes: reservoir assessment and characterization; TORIS research support; upgrade the BPO crude oil analysis data base; and compilation and analysis of outcrop data from the Muddy and Almond Formations. Microbial technology covers development of improved microbial flooding methods; and microbial-enhanced waterflooding field project.

Not Available

1993-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Nonequilibrium sulfur capture and retention in an air cooled slagging coal combustor. Quarterly technical progress report, 1996  

SciTech Connect (OSTI)

The objective of this 24 month project is to determine the degree of sulfur retention in slag in a full scale cyclone coal combustor with sulfur capture by calcium oxide sorbent injection into the combustor. This sulfur capture process consists of two steps: Capture of sulfur with calcined calcium oxide followed by impact of the reacted sulfur-calcium particles on the liquid slag lining the combustor. The sulfur bearing slag must be removed within several minutes from the combustor to prevent re-evolution of the sulfur from the slag. To accomplish this requires slag mass flow rates in the range of several 100 lb/hr. To study this two step process in the combustor, two groups of tests are being implemented. In the first group, calcium sulfate in the form of gypsum, or plaster of Paris, was injected in the combustor to determine sulfur evolution from slag. In the second group, the entire process is tested with limestone and/or calcium hydrate injected into the combustor. This entire effort consists of a series of up to 16 parametric tests in a 20 MMtu/hr slagging, air cooled, cyclone combustor. During the present quarterly reporting period ending September 30,1996, three tests in this project were implemented, bringing the total tests to 5. In addition, a total of 10 test days were completed during this quarter on the parallel project that utilizes the same 20 MMtu/hr combustor. The results of that project, especially those related to improved slagging performance, have a direct bearing on this project in assuring proper operation at the high slag flow rates that may be necessary to achieve high sulfur retention in slag.

Zauderer, B.

1996-11-01T23:59:59.000Z

442

Meteorological and air quality data quarterly report. WIPP site: Eddy County, New Mexico. Summer quarter, June 1977-August 1977  

SciTech Connect (OSTI)

The purpose of the WIPP meteorological, air quality, and radiological measurements program was to support the environmental effort for the evaluation of the site suitability. This data report is the latest in a series of seasonal quarterly data summaries to be issued for the southeastern New Mexico site.

Pocalujka, L.P.; Babij, E.; Catizone, P.A.; Church, H.W.

1980-06-01T23:59:59.000Z

443

Identification and Evaluation of Fluvial-Dominated Deltaic Reservoirs. Quarterly technical progress report, October 1-December 31, 1996  

SciTech Connect (OSTI)

This document is provided as a Quarterly Technical Progress Report for the program entitled 'Identification and Evaluation of Fluvial- Dominated Deltaic (Class 1 Oil) Reservoirs in Oklahoma', covering the reporting period of October 1 - December 31, 1996. Work is progressing as expected for the project. The FDD computer facility is fully operational. During this quarter, there were 37 industry 'visits' to use the facility. The Cleveland and Peru Plays workshop was completed on October 17, 1996 with 85 attendees. The Red Fork Play workshop is scheduled for March 5 and 12, 1997. The Red Fork text was submitted for editing, and all figures, maps, and plates were submitted to cartography for drafting. The Tonkawa workshop is scheduled for June, 1997 although the exact time and place have yet to be determined. Regional work and field studies for that play are in progress. This project is serving an extremely valuable role in the technology transfer activities for the Oklahoma petroleum industry, with very positive industry feedback.

Banken, M.K.; Andrews, R.

1997-09-12T23:59:59.000Z

444

Identification and Evaluation of Fluvial-Dominated Deltaic Reservoirs. Quarterly technical report, January 1-March 31, 1997  

SciTech Connect (OSTI)

This document is provided as a Quarterly Technical Progress Report for the program entitled `Identification and Evaluation of Fluvial- Dominated Deltaic (Class 1 Oil) Reservoirs in Oklahoma`, covering the reporting period of January 1 - March 31, 1997. Work is progressing as expected for the project. The FDD computer facility is fully operational. During this quarter, there were 28 industry `visits` to use the facility. The Red Fork Play workshop was completed on March 5 in Norman, and on March 12, 1997 in Bartlesville, with a total of 195 attendees. The Tonkawa Play workshop is scheduled for July 9, 1997 in Norman. The Tonkawa text, figures, maps, and plates are in preparation. The Bartlesville workshop is scheduled for October, 1997, although the exact time and place have yet to be determined. Regional work and field studies for that play are in progress. This project is serving an extremely valuable role in the technology transfer activities for the Oklahoma petroleum industry, with very positive industry feedback.

Banken, M.K.; Andrews, R.

1997-09-12T23:59:59.000Z

445

Advanced research and technology development fossil energy materials program. Quarterly progress report for the period ending September 30, 1981  

SciTech Connect (OSTI)

This is the fourth combined quarterly progress report for those projects that are part of the Advanced Research and Technology Development Fossil Energy Materials Program. The objective is to conduct a program of research and development on materials for fossil energy applications with a focus on the longer-term and generic needs of the various fossil fuel technologies. The program includes research aimed toward a better understanding of materials behavior in fossil energy environments and the development of new materials capable of substantial enhancement of plant operations and reliability. Work performed on the program generally falls into the Applied Research and Exploratory Development categories as defined in the DOE Technology Base Review, although basic research and engineering development are also conducted. A substantial portion of the work on the AR and TD Fossil Energy Materials Program is performed by participating cntractor organizations. All subcontractor work is monitored by Program staff members at ORNL and Argonne National Laboratory. This report is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1981 in which projects are organized according to fossil energy technologies. We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program.

Bradley, R.A. (comp.) [comp.

1981-12-01T23:59:59.000Z

446

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

447

Second Quarter 2014 Volume 7, number 2  

E-Print Network [OSTI]

.5% in Q2, 4.1% in Q3, and 2.6% in Q4. March projections for annual average real GDP provided. The Bureau of Economic Analysis (BEA) reports U.S. real GDP expanded at an annual rate of 1.1% in Q1 2013, 2 coincides with positive signals from the market--accelerating GDP growth, employment gains, and rebounding

448

Treatment of metal-laden hazardous wastes with advanced clean coal technology by-products. Quarterly report, February--May 1995  

SciTech Connect (OSTI)

This report describes the activities of the project team during the reporting period. The principal work has focused upon the laboratory treatment of six wastes with three by-products and the evaluation of the stability of the resulting eighteen materials. Other efforts during the third quarter have been directed toward completion of the collection and analysis of by-products, the identification of a suitable fourth by-product, and the definition of the approach to the solidification tests. The activity on the project during the third quarter of Phase One has fallen into three major areas: acquiring and analyzing by-products; treating hazardous wastes with by-products in the laboratory and analyzing the results; and conducting administrative activities, including public relations and personnel additions. The hazardous wastes that are used include industrial wastewater treatment residue from battery manufacturing plant; contaminated soil from a remediation project conducted at a munitions depot; contaminated soil from a remediation project conducted at an abandoned industrial site; contaminated soil from a remediation project conducted at a former sewage treatment plant; air pollution control dust from basic oxygen furnace steel production; and air pollution control ash from municipal waste incineration.

NONE

1995-07-01T23:59:59.000Z

449

Study of the effects of ambient conditions upon the performance of fan powered, infrared, natural gas burners. Quarterly technical progress report, October 1, 1996--December 31, 1996  

SciTech Connect (OSTI)

This quarterly technical progress report describes work performed under DOE Grant No. DE-FG22-94MT94011 during the period September 1, 1996 to December 31, 1996 which covers the nineth quarter of the project. The objective of this investigation is to characterize the operation of a fan powered infrared burner (IR burner) at various gas compositions and ambient conditions and develop design guidelines for appliances containing PIR burners for satisfactory performance. The fan powered infrared burner is a technology introduced more recently in the residential and commercial markets. It is a surface combustor that elevates the temperature of the burner head to a radiant condition. A variety of metallic and ceramic materials are used for the burner heads. It has been demonstrated that infrared burners produce low CO and NO{sub x} emissions in a controlled geometric space. As the environmental regulations become more stringent, infrared burners are receiving increasing interests.

Bai, T.

1997-01-01T23:59:59.000Z

450

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

451

Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993  

SciTech Connect (OSTI)

This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

Not Available

1993-12-31T23:59:59.000Z

452

Silicon ingot casting - heat exchanger method (HEM); multi-wire slicing - fixed abrasive slicing technique (FAST). Phase IV. Silicon sheet growth development for the Large Area Sheet Task of the Low-Cost Solar Array Project. Quarterly progress report No. 4, October 1-December 31, 1980  

SciTech Connect (OSTI)

The crystallinity of large-size ingots has been studied as a function of the heat flow conditions at the bottom of the ingot. The size of the ingot has an important effect on crystallinity. The breakdown in crystallinity across the bottom has been resolved to an area in the vicinity of the melted-back seed. Generally, homogeneous resistivity distribution has been achieved all over the ingot. Electroplating of diamonds on one side of the wirepack has an important effect on slicing performance. However, diamond electroplating must be carefully controlled to have a good seat in the grooved rollers. An in-house electroplating facility is now operational. Good performance was achieved with the initial in-house electroplated wirepacks. Projected add-on cost of HEM ingot casting process has been carried out using IPEG analysis. The value that was obtained is $8.65/m/sup 2/, well below the allocation of $18.15/m/sup 2/ to meet the 1986 goal.

Schmid, F.; Khattak, C.P.; Basaran, M.

1981-02-01T23:59:59.000Z

453

BEV Charging Behavior Observed in The EV Project for 2013  

SciTech Connect (OSTI)

This fact sheet will be issued quarterly to report on the number of Nissan Leafs vehicle usage, charging locations, and charging completeness as part of the EV Project. It will be posted on the INL/AVTA and ECOtality websites and will be accessible by the general public. The raw data that is used to create the report is considered proprietary/OUO and NDA protected, but the information in this report is NOT proprietary nor NDA protected.

Brion D. Bennett

2014-01-01T23:59:59.000Z

454

Of Interest to Managers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 IEP Quarterly Highlights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  

E-Print Network [OSTI]

at the SWP and CVP fish facilities. Kate Le's review of Delta water project operations indicates that heavy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Delta Water Project Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Fish Salvage at the State Water Project and Central Valley Project Fish Facilites in 2004

455

The Savannah River Site's Groundwater Monitoring Program: Second quarter 1992  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1992 are listed in this report.

Rogers, C.D. (Westinghouse Savannah River Co., Aiken, SC (United States))

1992-10-07T23:59:59.000Z

456

The Savannah River Site's Groundwater Monitoring Program: Fourth quarter 1991  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

Rogers, C.D. (Westinghouse Savannah River Co., Aiken, SC (United States))

1992-06-02T23:59:59.000Z

457

Natural gas imports and exports. First quarter report 1997  

SciTech Connect (OSTI)

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico. 14 figs., 9 tabs.

NONE

1997-09-01T23:59:59.000Z

458

Natural gas imports and exports. Third quarter report 1997  

SciTech Connect (OSTI)

This quarterly report, prepared by The Office of Natural Gas and Petroleum Import and Export Activities, summarizes the data provided by companies authorized to import or export natural gas. Numerical data are presented in four attachments, each of which is comprised of a series of tables. Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent calendar quarters. Volumes and prices of gas purchased by long-term importers and exporters during the past year are given in Attachment B. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D lists gas exported on a short-term or spot market basis to Canada and Mexico. Highlights of the report are very briefly summarized.

NONE

1998-01-01T23:59:59.000Z

459

High flux isotope reactor. Quarterly report, January-March 1982  

SciTech Connect (OSTI)

Routine reactor operation with four end-of-cycle shutdowns and one scheduled shutdown for training purposes resulted in an on-stream time of 92.1% for the quarter. The outer control plates were changed. The control plate track guide bearings, the control plate extension tubes, and the shock absorbers were replaced and a semiannual core component inspection was made. Cracks were discovered in the outermost ring of the beryllium reflector.

Corbett, B.L.; Poteet, K.H.

1982-06-01T23:59:59.000Z

460

High Flux Isotope Reactor quarterly report, April-June 1986  

SciTech Connect (OSTI)

Four routine cycles of operation were completed during the second quarter. Four scheduled end-of-cycle shutdowns, three other scheduled shutdowns, and two unscheduled shutdowns resulted in an on-stream time of 90.7%. The control plates and cylinder were replaced during the end-of-cycle 281 shutdown. Control plate set 2 and previously unirradiated cylinder No. 9 were inserted into the reactor.

Corbett, B.L.; Farrar, M.B.

1986-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Sanitary Landfill Groundwater Monitoring Report (Data Only) - First Quarter 1999  

SciTech Connect (OSTI)

This report contains analytical data for samples taken during First Quarter 1999 from wells of the LFW series located at the Sanitary Landfill at the Savannah River Site (SRS). This report presents monitoring results that equaled or exceeded the Safe Drinking Water Act final Primary Drinking Water Standards or screening levels, established by the U.S. Environmental Proteciton Agency, the South Carolina final Primary Drinking Water Standard for lead, or the SRS flagging criteria.

Chase, J.

1999-05-26T23:59:59.000Z

462

Sanitary landfill groundwater monitoring report. First Quarter 1995  

SciTech Connect (OSTI)

This report contains analytical data for samples taken during first quarter 1994 from wells of the LFW series located at the Sanitary Landfill Operating permit (DWP-0874A). The report presents monitoring results that equaled or exceeded the Safe Drinking Water Act final Primary Drinking Water Standards (PDWS) or screening levels, established by the US Environmental Protection Agency, the South Carolina final Primary Drinking Water Standard for lead, or the SRS flagging criteria.

NONE

1995-06-01T23:59:59.000Z

463

The role of the resid solvent in co-processing with finely divided catalysts. Quarterly report April--June 1993  

SciTech Connect (OSTI)

The primary purpose of the work performed this quarter was to establish under thermal and catalytic reaction conditions whether hydrogen transfer occurred between cycloalkane type structures that are present in resids and heteroatomic species that are present in coal and liquefied coal. The research this quarter focused upon evaluating benzophenone (BENZ) as a model acceptor for hydrogen that might be transferred from a cycloalkane, perhydropyrene (PHP), under coprocessing conditions. Hence, a number of reactions was performed in which BENZ was reacted alone in hydrogen and nitrogen atmospheres in the presence and absence of a catalytic agent, molybdenum naphthenate. Reactions were also performed using a combination of PHP and BENZ at a 1 to 1 weight ratio. Also performing this quarter were initial separations with petroleum resids. Two different resids were used, Maya and LHC-362. The literature was also surveyed to determine important characteristics that should be evaluated for selecting resids. The resids that are desired for this project are resids with high-, medium-, and low-naphthenic content. Different levels of asphaltenes are also desirable. Resids with these characteristics are currently being sought. The model compound PHP that had been commercially available as naphthene representative of resids is now no longer available. Hence, several scoping experiments were performed in order to determine conditions for synthesizing PHP. The synthesis procedure reported in US Patent 3,303,227 was used as a basis for this work. Although more than 85% PHP was synthesized, partially hydrogenated pyrenes were also produced which will require separation in order to obtain pure PHP.

Curtis, C.W.

1993-11-01T23:59:59.000Z

464

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied ...

465

Characterization of available coals from Illinois mines. [Quarterly] technical report, March 1, 1993--May 31, 1993  

SciTech Connect (OSTI)

The goal of this project is to characterize marketed coals from Illinois mines. The characterization parameters that are being determined include the concentration of all trace and minor elements that are of environmental concern, proximate and ultimate compositions, the pyrite size distribution and maceral association, preliminary froth flotation cleanability, slagging and fouling characteristics relevant to the coal`s behavior in utility boilers, chlorine forms and distribution, and certain gasification and rheology parameters. During the third quarter, the trace element data base on Illinois coals was fully checked and edited. The determinations of the trace and minor element contents and proximate and ultimate compositions of the 34 project samples were largely completed. The pyritic S content, still high in some of the marketed samples, could be reduced further in the samples by advanced physical cleaning techniques. Results from the analysis of all 34 samples for Ba, Hg, Mn, and Zr indicate that these elements are primarily or partly associated with mineral matter and, therefore, their concentrations could also be reduced further in the product coals by advanced physical cleaning techniques. A sequential extraction of Cl from two of the samples revealed that regardless of the initial chlorine concentration of the two coals, the total combined amount of chlorine extracted by water, ammonia, and sodium hydroxide is about the same.

Demir, I.; Harvey, R.D.; Ruch, R.R.; Chaven, C.; Damberger, H.H.; Steele, J.D.; Frankie, W.T. [Illinois State Geological Survey, Champaign, IL (United States)

1993-09-01T23:59:59.000Z

466

First Quarter Hanford Seismic Report for Fiscal Year 1999  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. They also locate and identify sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consists of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the first quarter of FY99 for stations in the HSN was 99.8%. There were 121 triggers during the first quarter of fiscal year 1999. Fourteen triggers were local earthquakes; seven (50%) were in the Columbia River Basalt Group, no earthquakes occurred in the pre-basalt sediments, and seven (50%) were in the crystalline basement. One earthquake (7%) occurred near or along the Horn Rapids anticline, seven earthquakes (50%) occurred in a known swarm area, and six earthquakes (43%) were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometer during the first quarter of FY99.

DC Hartshorn; SP Reidel; AC Rohay

1999-05-26T23:59:59.000Z

467

Next Generation Hydrogen Station Composite Data Products: Data through Quarter 4 of 2013  

SciTech Connect (OSTI)

This report includes 25 composite data products (CDPs) produced for next generation hydrogen stations, with data through quarter 4 of 2013.

Sprik, S.; Kurtz, J.; Peters, M.

2014-05-01T23:59:59.000Z

468

First and Second Quarter Hanford Seismic Report for Fiscal Year 2004  

SciTech Connect (OSTI)

This report describes seismic activity at and near the Hanford Site during the first and second quarters of FY 2004 (October 1, 2003-March 31, 2004).

Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.

2004-07-28T23:59:59.000Z

469

First and Second Quarters Hanford Seismic Report for Fiscal Year 2005  

SciTech Connect (OSTI)

This report describes the earthquakes that occurred in the Hanford seismic monitoring network during the first and second quarters of Fiscal Year 2005

Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.; Sweeney, Mark D.; Clayton, Ray E.

2004-12-09T23:59:59.000Z

470

1Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2005. Data for these indicators are gathered by Field elements...

471

2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators QuarterlyReport covering the period from April to June 2008. Data for these indicators aregathered by Field elements...

472

2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from April to June  2003. Data for these indicators are gathered by Field elements...

473

3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July  through September 2011. Data for these indicators were gathered...

474

1Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January  to March 2006. Data for these indicators are gathered by Field...

475

3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from July to September  2003. Data for these indicators are gathered by Field...

476

3Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

The Facility Representative Program Indicators (Pis) Quarterly Report attached, covering the period from July to September 2000. Data for these indicators are gathered by the Field elements...

477

3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these...

478

4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"Attached is the Facility Representative (FR) Program Performance Indicators QuarterlyReport covering the period from October to December 2007. Data for these indicators aregathered by Field...

479

2Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from April to June  2004. Data for these indicators are gathered by Field elements...

480

4Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative Program Performance Indicators (Pis) Quarterly Report Covering the Period from October to December 2002. Data for these indicators are gathered by Field...

Note: This page contains sample records for the topic "quarter projects cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were...

482

3Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July to September 2001. Data for these indicators are gathered by the Field...

483

2Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period April through June 20 1 1. Data for these indicators were gathered...

484

3Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from July to September  2004. Data for these indicators are gathered by Field...

485

1Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from January to March2010. Data for these indicators are gathered by Field...

486

3Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from July to September 2009. Data for these indicators are gathered by Field...

487

4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field...

488

4Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from October to December 2009. Data for these indicators are gathered by Field...

489

3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July  to September  2002. Data for these indicators are gathered by the Field...

490

2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by field elements...

491

3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field...

492

1Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January to March 2001. Data for these indicators are gathered by the Field...

493

4Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October through December 2011. Data for these indicators were...

494

1Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January  to March  2002. Data for these indicators are gathered by the Field...

495

4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2005. Data for these indicators are gathered by Field...

496

4Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period October through December 2010. Data for these...

497

4Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from October to December  2004. Data for these indicators are gathered by Field...

498

3Q C&2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from July to September   2008. Data for these indicators aregathered by Field...

499

1Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

"Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from January to March 2009. Data for these indicators are gathered by Field...

500

2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Broader source: Energy.gov [DOE]

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2005. Data for these indicators are gathered by Field elements...