National Library of Energy BETA

Sample records for quarter projects cxs

  1. Short-term energy outlook quarterly projections. Third quarter 1997

    SciTech Connect (OSTI)

    1997-07-01

    This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

  2. Short-term energy outlook. Quarterly projections, second quarter 1996

    SciTech Connect (OSTI)

    1996-04-01

    The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

  3. Short-term energy outlook. Quarterly projections, Third quarter 1995

    SciTech Connect (OSTI)

    1995-08-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

  4. Short-term energy outlook: Quarterly projections. Second quarter 1995

    SciTech Connect (OSTI)

    1995-05-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  5. Short-term energy outlook. Quarterly projections, third quarter 1996

    SciTech Connect (OSTI)

    1996-07-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  6. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    SciTech Connect (OSTI)

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  7. Short-term energy outlook quarterly projections. First quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-02-07

    The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

  8. Short-term energy outlook: Quarterly projections, second quarter 1997

    SciTech Connect (OSTI)

    1997-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

  9. Short-term energy outlook. Quarterly projections, first quarter 1996

    SciTech Connect (OSTI)

    1996-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

  10. Short-term energy outlook, quarterly projections, second quarter 1998

    SciTech Connect (OSTI)

    1998-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  11. Short-term energy outlook. Quarterly projections, Third quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

  12. Recommendation 179: DOE Quarterly Project Reviews | Department of Energy

    Office of Environmental Management (EM)

    9: DOE Quarterly Project Reviews Recommendation 179: DOE Quarterly Project Reviews ORSSAB Recommendation to DOE on Providing Information in the DOE Quarterly Project Reviews. Recommendation 179 (107.34 KB) DOE response to recommendation 179 (293.68 KB) More Documents & Publications Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 164: Recommendation on Engineering and Technology Development on the Oak Ridge Reservation Recommendation 163:

  13. MicroBooNE Project Quarterly Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Quarterly Reports Fiscal 2010 Qtr-3 Apr-May-Jun Qtr-4 Jul-Aug-Sep Fiscal 2011 Qtr-1 Oct-Nov-Dec Qtr-2 Jan-Feb-Mar Qtr-3 Apr-May-Jun Qtr-4 Jul-Aug-Sep DOE Reviews CD-0 Mission Need Statement DOE CD-1 Review 03/2-3/2010 DOE CD-2 Review 8/10-11/2011 DOE CD-3 Review - no date Fermilab Director's Reviews Initial Director's Review 11/4-6/2009 Director's CD2 Requirements Progress 3/29-30-31/2011 Independent Design and Director's CD-2 Review 7/12-14/2011 CD-3 Readiness - no date

  14. Short-term energy outlook, quarterly projections, first quarter 1998

    SciTech Connect (OSTI)

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  15. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #23, April-June 2009

    SciTech Connect (OSTI)

    Schell, D.

    2009-08-01

    April to June, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

  16. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #20, July-September 2008

    SciTech Connect (OSTI)

    Schell, D. J.

    2008-12-01

    July to September, 2008 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

  17. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #25, October - December 2009

    SciTech Connect (OSTI)

    Schell, D.

    2010-01-01

    October to December, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

  18. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #15, April - June 2007

    SciTech Connect (OSTI)

    Schell, D.

    2007-07-01

    July quarterly update for the National Bioenergy Center's Biochemical Processing Platform Integration Project.

  19. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #22, January - March 2009

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    January to March, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

  20. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009

    SciTech Connect (OSTI)

    Schell, D.

    2009-10-01

    July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

  1. QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION

    Gasoline and Diesel Fuel Update (EIA)

    3Q) 1991 3 QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION August 1991 This publication may be purchased from the Superintenden t of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or

  2. QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION

    Gasoline and Diesel Fuel Update (EIA)

    1Q) 1991 1 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION February 1991 This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or

  3. QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION

    Gasoline and Diesel Fuel Update (EIA)

    >OE/EIA-0202(92/3Q) 1992 3 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION August 1992 This publication and other Energy Information Administration (EIA) publications may be purchased from the Superintendent of Documents, U.S. Government Printing Office. All telephone orders should be directed to: U.S. Government Printing Office Farragut Bookstore 151 OH Street N.W. Washington, DC 20005 (202)653-2050 FAX (202) 376-5055 9 a.m. to 5 p.m., eastern time,

  4. Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs |

    Office of Environmental Management (EM)

    Department of Energy 4: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs The ORSSAB recommends DOE Quarterly Project Reviews Be Shared with the EM SSABs. Recommendation 174 (324.16 KB) DOE response to recommendation 174 (122.81 KB) More Documents & Publications Recommendation 179: DOE Quarterly Project Reviews Recommendation 173: Recommendation to Support Establishment and Continuation of the Office of

  5. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #21, October - December 2008

    SciTech Connect (OSTI)

    Schell, D.

    2009-01-01

    October to December, 2008 edition of the National Bioenergy Center?s Biochemical Platform Integration Project quarterly newsletter.

  6. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #10, January-March 2006

    SciTech Connect (OSTI)

    Not Available

    2006-04-01

    Volume 10 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

  7. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #9, October-December 2005

    SciTech Connect (OSTI)

    Schell, D. J.

    2006-01-01

    Volume 9 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

  8. National Bioenergy Center Biochemical Platform Process Integration Project: Quarterly Update #18, January-March 2008

    SciTech Connect (OSTI)

    Schell, D.

    2008-04-01

    January-March, 2008 edition of the quarterly update for the National Bioenergy Center's Biochemical Platform Integration Project.

  9. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #11, April-June 2006

    SciTech Connect (OSTI)

    Schell, D.

    2006-07-01

    Volume 11 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

  10. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #12, July-September 2006

    SciTech Connect (OSTI)

    Schell, D.

    2006-10-01

    Volume 12 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

  11. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    SciTech Connect (OSTI)

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  12. Yucca Mountain Site Characterization Project Technical Data Catalog (Quarterly supplement)

    SciTech Connect (OSTI)

    1993-12-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  13. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    SciTech Connect (OSTI)

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  14. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    SciTech Connect (OSTI)

    1993-06-30

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993.

  15. Yucca Mountain Site Characterization Project technical data catalog quarterly supplement

    SciTech Connect (OSTI)

    1995-03-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  16. Pinellas Environmental Restoration Project Quarterly Progress...

    Office of Legacy Management (LM)

    ... a chemical is added to the treatment system influent water for the purpose of keeping ... Login Number: F22683 Account: STOLCOGJ - S M Stoller Project: STAR Center- 4.5 Acre Site, ...

  17. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    SciTech Connect (OSTI)

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  18. Technical Data Catalog: Yucca Mountain Site Characterization Project. Quarterly supplement

    SciTech Connect (OSTI)

    1995-06-30

    This report presents reference information contained in the Yucca Mountain Project Automated Technical Data Tracking System. The Department of Energy is seeking to design and maintain a geologic repository for the disposal of high-level radioactive wastes. However, before this repository can be built, the DOE must first do a comprehensive site evaluation. This evaluation is subject to many regulations. This report fulfills the reporting requirements of the Site-Specific Procedural Agreement for Geologic Repository to develop and maintain a catalog of data which will be updated and provided to the Nuclear Regulatory Commission on a quarterly basis. This catalog contains: description of data; time, place, and method of acquisition; and where data may be examined.

  19. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    SciTech Connect (OSTI)

    1998-10-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  20. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    SciTech Connect (OSTI)

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  1. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #26, January - March 2010

    SciTech Connect (OSTI)

    Schell, D.

    2010-04-01

    January-March, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding and improving sugar measurements in biomass hydrolysates; expansion of the NREL/DOE Biochemical Pilot Plant.

  2. National Bioenergy Center--Biochemical Platform Integration Project: Quarterly Update, Fall 2010

    SciTech Connect (OSTI)

    Schell, D.

    2010-12-01

    Fall 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: rapid analysis models for compositional analysis of intermediate process streams; engineered arabinose-fermenting Zymomonas mobilis strain.

  3. Tampa Electric Company -- IGCC Project. Quarterly report, July--September 1995

    SciTech Connect (OSTI)

    1995-10-01

    This is the quarterly report for 1995 of the Tampa Electric Company integrated gasification combined-cycle project at Polk Power Station. As of the end of the third quarter of 1995, engineering is essentially complete; construction is about 50% complete. The project is on schedule for the Target Project Completion Date of September 15, 1996. The work force at the site now stands at 1,300 people. Recently the project was recognized for reaching 1 million man-hours without a lost time injury. The report discusses engineering issues, project management issues, construction issues, and accomplishments of each.

  4. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  5. Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

  6. Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  7. Genomes to life project quarterly report February 2003.

    SciTech Connect (OSTI)

    Heffelfinger, Grant S.

    2003-08-01

    This SAND report provides the technical progress for the first quarter (through February 2003) of the Sandia-led project, 'Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling,' funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO2 are important terms in the global environmental response to anthropogenic atmospheric inputs of CO2 and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In

  8. Basalt waste isolation project. Quarterly report, April 1, 1981-June 30, 1981

    SciTech Connect (OSTI)

    Deju, R.A.

    1981-08-01

    This document reports progress made in the Basalt Waste Isolation Project during the third quarter of fiscal year 1981. Efforts are described for the following programs of the project work breakdown structure: systems; waste package; site; repository; regulatory and institutional; test facilities; in situ test facilities.

  9. Basalt Waste Isolation Project. Quarterly report, July 1, 1980-September 30, 1980

    SciTech Connect (OSTI)

    Deju, R.A.

    1980-11-01

    This report presents the technical progress for the Basalt Waste Isolation Project for the fourth quarter of fiscal year 1980. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration; geosciences; hydrology; engineered barriers; near-surface test facility; engineering testing; and repository studies. Summaries of major accomplishments for each of these areas are reported.

  10. Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981

    SciTech Connect (OSTI)

    Hanenburg, W.H.; Lacy, R.G.; Van De Mark, G.D.

    1981-06-01

    Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  11. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    SciTech Connect (OSTI)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  12. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #28, Spring 2011

    SciTech Connect (OSTI)

    Schell, D. J.

    2011-04-01

    Spring 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program sessions and special topic sessions; assessment of waste water treatment needs; and an update on new arabinose-to-ethanol fermenting Zymomonas mobilis strains.

  13. National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Summer 2011 (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    Summer 2011 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: evaluating new analytical techniques for measuring soluble sugars in the liquid portion of biomass hydrolysates, and measurement of the fraction of insoluble solids in biomass slurries.

  14. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #27, April - June 2010

    SciTech Connect (OSTI)

    Schell, D.

    2010-07-01

    April-June, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding performance of alternative process configurations for producing ethanol from biomass; investigating Karl Fischer Titration for measuring water content of pretreated biomass slurries.

  15. West Hackberry Tertiary Project. Quarterly technical progress report, January 1, 1996--March 31, 1996

    SciTech Connect (OSTI)

    Gillham, T.; Cerveny, B.; Turek, E.

    1996-04-10

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomic. The first quarter of 1996 was outstanding both in terms of volume of air injected and low cost operations. More air was injected during this quarter than in any preceding quarter. The compressors experienced much improved run time with minimal repairs. Low operating costs resulted from no repairs required for injection or production wells. A discussion of the following topics are contained herein: (1) performance summary for the injection and production wells, (2) air compressor operations, (3) updated bottom hole pressure data, (4) technology transfer activities and (5) plans for the upcoming quarter.

  16. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1--March 31, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This quarterly technical progress report presents progress on several different projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Pilot Program; Plasma Furnace Projects for waste destruction; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project for removal of radioactive materials; and Spray Casting Project.

  17. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  18. UNFINISHED JOURNEY Project. Quarterly report, July 1995--September 1995

    SciTech Connect (OSTI)

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  19. UNFINISHED JOURNEY Project. Quarterly report, April 1995--June 1995

    SciTech Connect (OSTI)

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994 to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  20. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

  1. Pinellas Environmental Restoration Project Quarterly Progress Report, Sitewide, January through March 2004

    Office of Legacy Management (LM)

    44 2004 GJ - - U.S. Department of Energy Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young-Rainey STAR Center January Through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy

  2. DOE/EIA-0202(84/1Q) Short-Term Energy Outlook Quarterly Projections

    Gasoline and Diesel Fuel Update (EIA)

    1Q) Short-Term Energy Outlook Quarterly Projections February 1984 Published: March 1984 Energy Information Administration Washington, D.C. t rt jrt- .ort- iort- iort- .iort- iort- lort- <ort- ort Tt- .erm -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term Term Term .-Term -Term uergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook

  3. DOE/EIA-0202(84/4Q) Short-Term Energy Outlook Quarterly Projections

    Gasoline and Diesel Fuel Update (EIA)

    4Q) Short-Term Energy Outlook Quarterly Projections October 1984 Published: November 1984 Energy Information Administration Washington, D.C. t rt jrt .ort lort iort lort iort lort \ort ort Tt .erm Term Term Term Term Term Term Term Term Term Term Term Term Term -Term -Term xrm nergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook

  4. DOE/EIA-0202(85/1Q) Short-Term Energy Outlook Quarterly Projections

    Gasoline and Diesel Fuel Update (EIA)

    1Q) Short-Term Energy Outlook Quarterly Projections January 1985 Published: February 1985 Energy Information Administration Washington, D.C. t rt jrt .ort lort lort lort nort lort *.ort ort Tt .m .erm -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term uergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook

  5. DOE/EIA-0202(85/3Q) Short-Term Energy Outlook Quarterly Projections

    Gasoline and Diesel Fuel Update (EIA)

    3Q) Short-Term Energy Outlook Quarterly Projections July 1985 Published: August 1985 Energy Information Administration Washington, D C t rt jrt .ort lort iort iort iort iort '.ort ort Tt .-m .erm -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook

  6. DOE/EIA-0202(90/2Q) SHOET-TERM QUARTERLY PROJECTIONS

    Gasoline and Diesel Fuel Update (EIA)

    0/2Q) SHOET-TERM QUARTERLY PROJECTIONS This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone

  7. Minnesota agripower project. Quarterly report, April--June 1997

    SciTech Connect (OSTI)

    Baloun, J.

    1997-07-01

    The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

  8. National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Winter 2011-2012 (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    Winter 2011-2012 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: 34th Symposium on Biotechnology for Fuels and Chemicals; feasibility of NIR spectroscopy-based rapid feedstock reactive screening; demonstrating integrated pilot-scale biomass conversion. The Biochemical Process Integration Task focuses on integrating the processing steps in enzyme-based lignocellulose conversion technology. This project supports the U.S. Department of Energy's efforts to foster development, demonstration, and deployment of 'biochemical platform' biorefineries that economically produce ethanol or other fuels, as well as commodity sugars and a variety of other chemical products, from renewable lignocellulosic biomass.

  9. Genomes to life project quarterly report June 2004.

    SciTech Connect (OSTI)

    Heffelfinger, Grant S.

    2005-01-01

    This SAND report provides the technical progress through June 2004 of the Sandia-led project, ''Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling'', funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO{sub 2} are important terms in the global environmental response to anthropogenic atmospheric inputs of CO{sub 2} and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In addition, we will

  10. Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1981--December 31, 1981

    SciTech Connect (OSTI)

    Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

    1983-08-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1981, through December 31, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  11. Heber geothermal binary demonstration project quarterly technical progress report, January 1, 1982--March 31, 1982

    SciTech Connect (OSTI)

    Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

    1983-08-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of January 1, 1982, through March 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  12. Heber geothermal binary demonstration project quarterly technical progress report, April 1, 1982--June 30, 1982

    SciTech Connect (OSTI)

    Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

    1983-08-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1982-June 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  13. Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1982--September 30, 1982

    SciTech Connect (OSTI)

    Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

    1983-03-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1982--September 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  14. Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1982--December 31, 1982

    SciTech Connect (OSTI)

    Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

    1983-05-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1982--December 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  15. Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1981--September 30, 1981

    SciTech Connect (OSTI)

    Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

    1983-08-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1981, through September 30, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the US Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  16. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    SciTech Connect (OSTI)

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  17. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    SciTech Connect (OSTI)

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management Program. The project period has been determined to be 7.5 months, April 1 to November 14, 1998 in order to align with the federal fiscal year. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI Program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reported are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College).

  18. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    SciTech Connect (OSTI)

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  19. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    SciTech Connect (OSTI)

    1993-03-31

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year.

  20. Quarterly Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2009 Federal Columbia River Power System (FCRPS) FY 2009 FIRST QUARTER REVIEW Projection for FY 2009 Net Revenues and Reserves A B C D FY 2008 Audited Actuals without FAS 133 &...

  1. Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995

    SciTech Connect (OSTI)

    1995-05-01

    The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

  2. DOE/EIA-0202(84/2QH Short-Term Energy Outlook Quarterly Projections

    Gasoline and Diesel Fuel Update (EIA)

    2QH Short-Term Energy Outlook Quarterly Projections May 1984 Published: June 1984 Energy Information Administration Washington, D.C. t rt jrt .ort lort .iort .iort- iort- iort- '.ort- ort- .m .erm Term Term Term Term Term Term Term Term Term Term Term Term i-Term rTerm -Term xrm uergy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy Outlook Outlook Outlook Outlook Outlook Outlook Outlook

  3. MHD Integrated Topping Cycle Project. Eighteenth quarterly technical progress report, November 1, 1991--January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    This eighteenth quarterly technical progress report of the MHD Integrated Topping cycle Project presents the accomplishments during the period November 1, 1991 to January 31, 1992. The precombustor is fully assembled. Manufacturing of all slagging stage components has been completed. All cooling panels were welded in place and the panel/shell gap was filled with RTV. Final combustor assembly is in progress. The low pressure cooling subsystem (LPCS) was delivered to the CDIF. Second stage brazing issues were resolved. The construction of the two anode power cabinets was completed.

  4. Tampa Electric Company - DOE IGCC project. Quarterly report, July 1 - September 30, 1996

    SciTech Connect (OSTI)

    1996-12-31

    The third quarter of 1996 has resulted in the completion of over five (5) years of extensive project development, design, construction and start-up of the 250 MW Polk Power Station Unit {number_sign}1 IGCC Project. the combined cycle performance test was completed on June 18, 1996. This test demonstrated that on distillate fuel, the combined cycle achieved a net output of 222,299 KW with a net heat rate of 6,868 BTU/KW. This is about 3.86% and 2.76% better than the guaranteed values of 214,040 KW and 7,063 BTU/KW respectively. During the third quarter of 1996, the combustion turbine was run on syngas two (2) different times for a combined total of about seven hours. Attachment {number_sign}4 shows graphically the transfer from oil to syngas. Emission levels were generally acceptable even though no specific emissions tuning was completed by GE and the emissions monitoring equipment was not yet completely operational.

  5. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    SciTech Connect (OSTI)

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  6. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    SciTech Connect (OSTI)

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  7. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #13, October-December 2006

    SciTech Connect (OSTI)

    Schell, D. J.

    2007-01-01

    Volume 13 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

  8. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #14, January - March 2007

    SciTech Connect (OSTI)

    Schell, D.

    2007-04-01

    Volume 14 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Biochemical Processing Integration Task.

  9. MHD Integrated Topping Cycle Project. Seventeenth quarterly technical progress report, August 1, 1991--October 31, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    This seventeenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period August 1, 1991 to October 31, 1991. Manufacturing of the prototypical combustor pressure shell has been completed including leak, proof, and assembly fit checking. Manufacturing of forty-five cooling panels was also completed including leak, proof, and flow testing. All precombustor internal components (combustion can baffle and swirl box) were received and checked, and integration of the components was initiated. A decision was made regarding the primary and backup designs for the 1A4 channel. The assembly of the channel related prototypical hardware continued. The cathode wall electrical wiring is now complete. The mechanical design of the diffuser has been completed.

  10. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  11. MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

  12. Coal air turbine ``CAT`` program, invention 604. Fifth quarter project report, October--December 1995

    SciTech Connect (OSTI)

    Foster-Pegg, R.W.

    1995-12-31

    The primary objective of this ``CAT`` (Coal Air Turbine) project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the CAT system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a CAT plant are proven, and the integration of the components into a complete plant is the only new developmental activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a commercial plant before the viability of a new concept is accepted. To satisfy this requirement the construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate for a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept. The major components of CAT plants are an air turbine, a heater of compressed air, a coal combustion system, means to recover waste heat and a steam turbine when appropriate. The plant burns raw coal in a fluid bed at atmospheric pressure. The air turbine operates on clean compressed air heated inside tubes immersed in the fluid bed. Progress during the fifth quarter is described.

  13. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    SciTech Connect (OSTI)

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management program. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reports are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College). The purpose of this program is to offer educational opportunities to Native Americans in the environmental field.

  14. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    SciTech Connect (OSTI)

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  15. Nucla circulating atmospheric fluidized bed demonstration project. Quarterly technical progress report, October--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  16. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #17, October-December 2007

    SciTech Connect (OSTI)

    Schell, D.

    2008-01-01

    October to December, 2007 edition of the newsletter of the Biochemical Platform Process Integration project.

  17. Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 34, quarter ending March 31, 1983

    SciTech Connect (OSTI)

    Linville, B.

    1983-07-01

    Progress achieved for the quarter ending March 1983 are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; and thermal/heavy oil. In addition, progress reports are presented for: resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovered by gravity mining; improved drilling technology; and general supporting research. (ATT)

  18. ARTI/MCRL Project Report products of motor burnout (Second quarter report)

    SciTech Connect (OSTI)

    Hawley-Fedder, R.

    1995-01-15

    The OSP (Operating Safety Procedure) required for performance of electrical arc testing of CFC replacement fluids was renewed. Electrical breakdown tests at one (1) atmosphere pressure have been performed for R-22, R-134a, and R-125/R-143a (50:50 blend; AZ-50), and breakdown products identified. No differences in HCFC breakdown products are seen in the presence or absence of lubricant oils. The design of the high pressure-high temperature test stand has been finalized, and construction initiated during this quarter. Three motor stators and rotors were received from Tecumseh Products Company for use in motor burnout tests. A test plan for the motor breakdown tests is in preparation.

  19. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    SciTech Connect (OSTI)

    1995-08-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation.

  20. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-08-15

    This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  1. MHD Integrated Topping Cycle Project. Fifteenth quarterly technical progress report, February 1991--April 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    A summary of the work is excerpted here. Final design of an MHD channel for the ITC program POC test has been completed. The channel was designed to be capable of 1.5 MW {sub e} power output and a lifetime of 2000 hours. Emphasis was placed upon durability and reliability. Hence, specific measures were taken to design against channel damage due to electric faults. The life-limiting issues associated with electrochemical corrosion and erosion of gas-side surfaces were addressed by the use of various materials with proven wear characteristics in a coal-fired MHD channel environment. Pitting of prototypical sidewall coupons was observed in the CDIF workhorse testing. The most likely cause of the observed pitting, water leaks resulting from cooling water tube braze failures, has been remedied. New brazing procedures and isolation of the sidebar gas-side material from water contact will prevent sidebar pitting in the prototypical channel. Water-side corrosion tests reported in this quarterly report include the latest results of tungsten-copper elements at controlled pH, heat flux and voltage levels. In the combustion subsystem, efforts continued to focus on understanding and improving the current levels of slag recovery and seed utilization achieved by the combustor. Analytical support was also provided in the areas of slag rejection system operation, precombustor operation, and oil burner design modification. Channel data analysis activities continued in support of prototypical coupon testing at the CDIF. Analyses are presented on channel wall slagging behavior and sidewall voltage distributions.

  2. Molten-Caustic-Leaching System Integration Project. Technical progress report, quarter ending March 27, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    The objective of this project is to modify an existing molten-caustic-leaching (MCL) system for coal upgrading so that it operates in an integrated continuous manner. The overall strategy consists of several tasks, but only a few are discussed here. Tasks discussed are: MCL circuit component testing (coal sample procurement), final circuit modifications for integrated operation, coal product handling/waste disposal (coal inventory disposal, MCL solid waste disposal), project management and control. (VC)

  3. Hanford Environmental Dose Reconstruction Project. Quarterly report, December 1993--February 1994

    SciTech Connect (OSTI)

    Cannon, S.D.

    1994-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radio-nuclides followed from release to impact on humans(dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, agriculture; environmental pathways; and dose estimates.

  4. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    SciTech Connect (OSTI)

    Cannon, S.D.; Finch, S.M.

    1993-12-31

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  5. MHD Integrated Topping Cycle Project. Twelfth quarterly technical progress report, May 1, 1990--July 31, 1990

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Projects represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem Avco is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), Westinghouse is responsible for the current consolidation subsystem.

  6. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996

    SciTech Connect (OSTI)

    1996-05-01

    This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  7. Basalt waste isolation project. Quarterly report, October 1, 1980-December 31, 1980

    SciTech Connect (OSTI)

    Deju, R.A.

    1981-02-01

    In September 1977, the National Waste Terminal Storage Program was restructured to support investigations of two US DOE sites - Hanford and Nevada. The Basalt Waste Isolation Project within Rockwell Hanford Operations has been chartered with the responsibility of conducting these investigations. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration, geosciences, hydrology, engineered barriers, near-surface test facility, engineering testing, and repository studies. Summaries of major accomplishments for each of these areas are reported in this document.

  8. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    SciTech Connect (OSTI)

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributed for review and comment.

  9. Minnesota Agri-Power Project. Quarterly report, January--March, 1998

    SciTech Connect (OSTI)

    Wilbur, D.

    1998-05-01

    The Minnesota Valley Alfalfa Producers propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota industrial park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project utilizes air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. This progress report describes feedstock testing, feedstock supply system, performance guarantees, sales contracts, environmental permits, education, environment, economy, and project coordination and control.

  10. Deflagration-to-detonation transition project. Quarterly report, December 1979-February 1980

    SciTech Connect (OSTI)

    Lieberman, M.L.

    1980-09-01

    Progress in a project on deflagration-to-detonation transition (DDT) is reported. The activities of this project pertain primarily to the development of small, safe, low-voltage, hot-wire detonators. Its major goals are: the formulation of a modeling capability for DDT of the explosive 2-(5-cyanotetrazolato)pentaamminecobalt (III) perchlorate (CP); the development of improved DDT materials; the establishment of a data base for corrosion, compatibility, and reliability of CP-loaded detonators; and the design and development of advanced DDT components. Information is included on materials development, component development, and compatibility studies encompassing the thermal and chemical stability of CP in contact with the component materials. (LCL)

  11. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, July 1, 1993--September 30, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    This document is a brief progress report from each of the research and education projects that are currently funded through the ERWM contract. During third quarter 1993, approval was given by DOE for purchase of equipment. Equipment purchases were initiated and much of the equipment has been received and installed. The committees in charge of coordination of sampling and analyses associated with the collaborative research groups continued to meet and address these issues. Sampling has been done in the lower part of Devil`s Swamp and in the Devil`s Swamp Lake area. In addition, extensive sampling has been done in Bayou Trepagnier and in Bayou St. John. During this period, Tulane and Xavier Universities continued working closely with Oak Ridge National Laboratories (ORNL). The ORNL 1993 summer student internship program was completed. Plans were made for expanding the program to support 8 students next summer. Leonard Price, a Xavier University Chemistry professor and John Walz, a Tulane University Engineering professor each spent 5 weeks at ORNL. During this time these faculty worked with ORNL researchers exploring mutual interests and discussing possible future collaborations. In September, Drs. Carl Gehrs, Lee Shugart and Marshall Adams of ORNL, visited the Tulane and Xavier campuses. They presented two seminars and met with several of the investigators being supported by the ERWM contract. Tulane/Xavier project administrators participated in the Office of Technology Development`s ``New Technologies and Program Exhibition`` in the Rayburn House Office Building on September 23 and in the Hart Senate Office Building on September 27.

  12. DOE Waste Package Project. Quarterly progress report, October 1, 1993--December 31, 1993

    SciTech Connect (OSTI)

    Ladkany, S.G.

    1993-12-31

    The Waste Package Project research activities continued in all research areas. The areas include: Container structural and stress analysis; Nuclear fission criticality studies; Investigation of canister design concepts and corrosion studies; Heat transfer studies; Fluid flow in porous media and radionuclide transport in near field rock; Studies of stresses and stability of the rock formations resulting from the thermal loading of the fuel elements and the multi tunnel concept being analyzed; Characterization of a Faulted Rock Tunnel Model Using Photoelastic and Finite Element Studies; Experiment studies of the dynamic response of a flexible three-link robot using strain gages and Lagrange polynomials; and Robotic manipulation of the nuclear waste container.

  13. Tampa Electric Company IGCC Project. Quarterly report, April 1 - June 30, 1996

    SciTech Connect (OSTI)

    1996-12-31

    Tampa Electric Company continued efforts to complete construction and start-up of the Polk Power Station, Unit {number_sign}1 which will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. From an overall standpoint, the Project continues to track well. The completion of construction system turnovers to Start-up is encouraging. Start-up will accept responsibility of the plant until turnover to operations. The major focus continues to be on the production of first Syngas, scheduled for July 17. All construction, engineering, and start-up activities are in support of Syngas production. Key activities toward this goal include final checkout and startup of remaining gasification systems, completion of punch list items required for first syngas, finalization of operating procedures, preparation of site and area access control plans, site- wide safety training, and other Process Safety management (PSM) requirements.

  14. Deflagration-to-detonation transition project: quarterly report for the period September through November 1979

    SciTech Connect (OSTI)

    Lieberman, M. L.

    1980-07-01

    The activities of the Sandia Laboratories project on deflagration-to-detonation transition (DDT) pertain primarily to the development of small, safe, low-voltage, hot-wire detonators. Its major goals are: the formulation of a modeling capability for DDT of the explosive 2-(5-cyanotetrazolato)pentaamminecobalt(III) perchlorate (CP); the development of improved DDT materials; the establishment of a data base for corrosion, compatibility, and reliability of CP-loaded detonators; and the design and development of advanced DDT components. Progress in this research is reported. The planned development of the MC3423 detonator has been completed and the final design review meeting has been held. Additional work must be performed to establish satisfactory output function. Ignition sensitivity data have also been obtained. Ignition and shock testing experiments for development of the MC3533 detonator have been planned. An initial version of the component will utilize available MC3423 headers, while the final design will incorporate a new header that has been designed and ordered. Detonator performance studies have been planned to optimize CP density-length factors. Feasibility studies on the MC3196A detonator have continued in an effort to obtain a reliable 50-200 ..mu..s function time.

  15. MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number_sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  16. Quarterly EMS Performance: FY 2012 First Quarter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly EMS Performance: FY 2012 First Quarter Quarterly EMS Performance: FY 2012 First Quarter Quarterly EMS Performance Assurance Summary October 1, 2011-December 31,2011 FY 2012 First Quarter (189.84 KB) More Documents & Publications Quarterly EMS Performance: FY 2011 First Quarter Quarterly EMS Performance FY 2013 First Quarter Quarterly EMS Performance: FY 2012 Second Quarter

  17. Low-Cost Solar-Array Project. Quarterly progress report, April-June 1980

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The overall objective of the LSA Silicon Material Task is to establish a chemical process for producing silicon at a rate and price commensurate with the production goals of the LSA project for solar-cell modules. As part of the overall Silicon Material Task, Union Carbide developed the silane-silicon process and advanced the technology to the point where it has a definite potential for providing high-purity polysilicon on a commercial scale at a price of $14/kg by 1986 (1980 dollars). This work, completed under Phases I and II of the contract, provided a firm base for the Phase III Program (initiated in April 1979) aimed at establishing the practicality of the process by pursuing the following specific objectives: (1) design, fabricate, install, and operate an Experimental Process System Development Unit (EPSDU) sized for 100 MT/yr to obtain extensive performance data to establish the data base for the design of commercial facilities; (2) perform support research and development to provide an information base usable for the EPSDU and for technological design and economic analysis for potential scale-up of the process; and (3) perform iterative economic analyses of the estimated product cost for the production of semiconductor-grade silicon in a facility capable of producing 1000 MT/yr. This process for preparing semiconductor-grade silicon in the EPSDU from metallurgical-grade (M-G) silicon is based on a well-integrated arrangement of purification steps that provides a cost-effective process system. The three basic steps entail converting M-G silicon to trichlorosilane, redistributing the trichlorosilane to produce silane, and thermally decomposing the silane to form amorphous silicon powder. The powder is then melted and the molten silicon is cast to polycrystalline for subsequent use in fabricating solar cells. Progress is reported in detail. (WHK)

  18. Coal Air Turbine ``CAT`` program invention 604. Eighth quarter project report and final for the project, August--September 1996

    SciTech Connect (OSTI)

    Foster-Pegg, R.W.

    1996-09-30

    The primary objective of this ``CAT`` project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the ``CAT`` system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a ``CAT`` plant are proven, and the integration of the components into a complete plant is the only new developmental activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a ``commercial plant`` before the viability of a new concept is accepted. To satisfy this requirement the construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate for a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept.

  19. Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

  20. RESEARCH QUARTERLY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RESEARCH QUARTERLY First Quarter 2015 Th 90 Ac 89 Pa 91 U 92 Np 93 Pu 94 Am 95 Cm 96 Bk 97 Cf 98 Es 99 Fm 100 Md 101 No 102 Lr 103 Glenn T. Seaborg Institute for Transactinium Science/Los Alamos National Laboratory Actinide Research Quarterly About the cover The crystalline structure of plutonium in its elemental form, and in molecules and compounds with other elements, is the basis for understanding the intriguing chemistry, physics, and engineering of plutonium molecules and compounds. Colored

  1. SmartGrid: Quarterly Data Summaries from the Data Hub and SmartGrid Project Information (from OpenEI and SmartGrid.gov)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Both OpenEI and SmartGrid.gov are DOE portals to a wealth of information about the federal initiatives that support the development of the technologies, policies and projects transforming the electric power industry. Projects funded through the U.S. Recovery Act are organized by type and pinned to an interactive map at http://en.openei.org/wiki/Gateway:Smart_Grid. Each project title links to more detailed information. The Quarterly Data Summaries from the Data Hub at SmartGrid.gov are also available on OpenEI at http://en.openei.org/datasets/node/928. In addition, the SmartGrid Information Center contains documents and reports that can be searched or browsed. Smart Grid Resources introduces international SmartGrid programs and sites, while OpenEI encourages users to add SmartGrid information to the repository.

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    SciTech Connect (OSTI)

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  3. SPEAR 3 Quarterly Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management

  4. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    SciTech Connect (OSTI)

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  5. Quarterly coal report, April--June 1990

    SciTech Connect (OSTI)

    Not Available

    1990-11-02

    The Quarterly Coal Report provides comprehensive information about US coal production, exports, imports, receipts, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. This issue presents detailed quarterly data for April 1990 through June 1990, aggregated quarterly historical data for 1982 through the second quarter of 1990, and aggregated annual historical data for 1960 through 1989 and projected data for selected years from 1995 through 2010. To provide a complete picture of coal supply and demand in the United States, historical information and forecasts have been integrated in this report. 7 figs., 37 tabs.

  6. Quarterly Progress Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quarterly Progress Reports Quarterly Progress Reports Investigating the field of high energy physics through experiments that strengthen our fundamental understanding of matter,...

  7. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th ...

  8. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    SciTech Connect (OSTI)

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  9. Strategic Petroleum Reserve. Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-11-15

    The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated. Samples of the oil revealed two problems that, although readily correctable, have reduced the availability of some of the oil inventory for drawdown in the near-term. These problems are: (1) a higher-than-normal gas content in some of the crude oil, apparently from years of intrusion of methane form the surrounding salt formation; and (2) elevated temperatures of some of the crude oil, due to geothermal heating, that has increased the vapor pressure of the oil. Investigations are proceeding to determine the extent to which gas intrusion and geothermal heating are impacting the availability of oil for drawdown. Preliminary designs have been developed for systems to mitigate both problems.

  10. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

  11. Quarterly Progress Report

    Broader source: Energy.gov [DOE]

    Quarterly Progress Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  12. Coal air turbine {open_quotes}CAT{close_quotes} program invention 604. Fourth quarter project report, July 1995--September 1995

    SciTech Connect (OSTI)

    Foster-Pegg, R.W.

    1995-10-31

    A coal air turbine `CAT` generates electric power and heat from coal combustion. The purpose of this project is the conceptual design of a `CAT` plant, and to make a comparison of the capital cost and and cost of power and steam from the `CAT` plant with power produced by alternate plants at the same site. Three configurations investigated include: condensing plant utilizing coal fuel and a condenser tower, or river, for cooling; a cogeneration plant utilizing coal and a steam turbine; and a cogeneration plant utilizing steam export and injection with waste coal fuel.

  13. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    SciTech Connect (OSTI)

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations.

  14. Financial Review: First-Quarter 2016 - Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    Markets & Finance Glossary › FAQS › Overview Data Market Prices and Uncertainty Charts Archive Analysis & Projections Major Topics Most popular Electricity Financial markets Financial reporting system Recurring All reports Browse by Tag Alphabetical Frequency Tag Cloud Current Issue 1st Quarter 2016 Previous Issues Annual 2015 (5/13/2016) 3rd Quarter 2015 (12/15/2015) 2nd Quarter 2015 (9/24/2015) 1st Quarter 2015 (7/20/2015) Annual 2014 (5/19/2015) 3nd Quarter 2014 (12/19/2014) 2nd

  15. (DOE Energy Conversion and Utilization Technology Program: NBS Measurement Technology Project): Quarterly progress report, January-March 1982

    SciTech Connect (OSTI)

    Semerjian, H.G.

    1982-01-01

    Proper understanding of sooting processes will aid in assessing the impact of alternative fuels on hardware durability, combustion and heat transfer efficiency, and the environment. These efforts are in direct support of ECUT projects dealing with open cycle/engine combustion technology, direct heating and conversion, physical processes, and chemical processes. Soot formation entails a number of complex processes that occur within and about the combustion zone. These include hydrocarbon cracking, nucleation, growth, agglomeration and burnout. The importance of free radical processes, the involvement of aromatic and acetylenic intermediates, and the effect of inorganic components on the soot formation processes will be investigated. The effect of physical properties (such as boiling point and viscosity) on the droplet formation, evaporation, combustion and subsequent soot formation processes will also be examined. The effect of flow field parameters on the chemical, as well as physical processes will be studied. Initial studies toward investigation of chemical effects on soot formation are being carried out in laboratory-scale diffusion flames of various configurations. Investigations of physical effects on soot formation are carried out in the NBS experimental furnace. A combination of optical diagnostic techniques are used. 8 refs.

  16. Coal air turbine {open_quotes}CAT{close_quotes} program, Invention 604. Third quarter project report, April 1995--June 1995

    SciTech Connect (OSTI)

    Foster-Pegg, R.W.

    1995-07-31

    The primary objective of this {open_quotes}CAT{close_quotes} project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the {open_quotes}CAT{close_quotes} system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a {open_quotes}CAT{close_quotes} plant are proven, and the integration of the components into a complete plant is the only new development activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a {open_quotes}commercial plant{close_quotes} before the viability of a new concept is accepted. To satisfy this requirement and construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept.

  17. EIA -Quarterly Coal Distribution

    U.S. Energy Information Administration (EIA) Indexed Site

    - Coal Distribution Quarterly Coal Distribution Archives Release Date: August 17, 2016 Next Release Date: December 22, 2016 The Quarterly Coal Distribution Report (QCDR) provides detailed quarterly data on U.S. domestic coal distribution by coal origin, coal destination, mode of transportation and consuming sector. All data are preliminary and superseded by the final Coal Distribution - Annual Report. Year/Quarters By origin State By destination State Report Data File Report Data File 2009

  18. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  19. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  20. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  1. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  3. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY ...

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  6. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual ...

  9. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY ...

  10. Lessons Learned Quarterly Report 1st Quarter FY 1996

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Success Stories: Articles from Department of Energy NEPA Lessons Learned Quarterly Reports 1996 Mar Hanford Tanks Public participation in NEPA process resulted in changes to the scope of the proposed project. The NEPA process resulted in enforceable mitigation commitments. 1997 Dec NPR Sale The NEPA process resulted in enforceable mitigation commitments for biological and cultural resources. 1999 Mar SPR Pipeline Integrating NEPA and the Section 404 permit processes proved efficient and resulted

  11. Quarterly Cybersecurity Awareness Campaigns and Toolkits | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Cybersecurity Awareness Campaigns and Toolkits Quarterly Cybersecurity Awareness Campaigns and Toolkits The OCIO coordinates quarterly cybersecurity awareness campaigns ...

  12. Strategic petroleum reserve. Quarterly report

    SciTech Connect (OSTI)

    1995-08-15

    The Strategic Petroleum Reserve reduces the Nation`s vulnerability to oil supply disruptions. Its existence provides a formidable deterrent to the use of oil as a political instrument and an effective response mechanism should a disruption occur. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current and projected storage capacity, analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  13. Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

  14. Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

  15. Quarterly Nuclear Deployment Summary, January 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 Quarterly Nuclear Deployment Summary, January 2013 January 30, 2013 - 5:59pm Addthis Quarterly Updates On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November

  16. Lessons Learned Quarterly Report, December 1998 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1998 Lessons Learned Quarterly Report, December 1998 Welcome to the fourth quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: New and Improved NEPA Compliance Guide Issued in 2 Volumes NEPA Community Meeting in Las Vegas Managing Baseline Environmental Information for the Sandia Site-wide EIS Water Project Mini-guidance Regulatory Compliance and NEPA Procedures for an Environmental Critique and Synopsis, and a Supplement Analysis EPA Broadens

  17. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    SciTech Connect (OSTI)

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  18. Quarterly coal report

    SciTech Connect (OSTI)

    Young, P.

    1996-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1995 and aggregated quarterly historical data for 1987 through the third quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  19. Contracts for field projects and supporting research on enhanced oil recovery. Quarterly technical progress report, October 1994--December 1994. Progress review No. 81

    SciTech Connect (OSTI)

    1996-03-01

    This document consists of a publications list for field projects and brief descriptions of research projects on enhanced petroleum recovery.

  20. Directives Quarterly Updates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

  1. Stockpile Stewardship Quarterly

    National Nuclear Security Administration (NNSA)

    Message from the (Acting) Assistant Deputy Administrator for Research, Development, Test, ... Quarterly is produced by the NNSA Office of Research, Development, Test, and Evaluation. ...

  2. Increased oil production and reserves from improved completion techniques in the Bluebell Field, Uinta Basin, Utah. Quarterly technical progress report, April 1, 1996--June 30, 1996, 11th Quarter of the project

    SciTech Connect (OSTI)

    Allison, E.; Morgan, C.D.

    1996-07-30

    The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project.

  3. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1991-08-15

    This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

  4. Lessons Learned Quarterly Report, June 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Welcome to the 59th quarterly report on lessons learned in the NEPA process. We are pleased to feature the DOE NCO meeting and the NAEP annual conference, where streamlining the NEPA process for Recovery Act projects and consideration of climate change in NEPA documents were both addressed. We’ve begun to follow up on suggestions from the NCO meeting (below).

  5. Lessons Learned Quarterly Report, December 1995

    Broader source: Energy.gov [DOE]

    This quarterly report summarizes the lessons learned for documents completed between July 1 and September 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs.

  6. ALCC Quarterly Report Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    These penalties will be removed within three business days after the late quarterly or EOP report is submitted. Appeals A PI or user may appeal a project or account suspension to ...

  7. Participants in Quarterly Public Forum Learn Latest News on Doing...

    Energy Savers [EERE]

    Doing Business with EM Participants in Quarterly Public Forum Learn Latest News on Doing Business with EM December 29, 2015 - 12:40pm Addthis EM Acquisition and Project Management...

  8. SITE-LEVEL SUMMARY (4Q) of FINAL-4TH-QUARTER-FY-2014-SCORECARD...

    Office of Environmental Management (EM)

    ... FORECAST DATE ACTUAL DATE EA DATE STATUS NARRATIVE VARIANCE NARRATIVE REGULATORY AGREEMENT NAME DESIGNATIONS GREEN SHADED DATES ARE 4TH QUARTER FY 2014 MILESTONES ARRA Project: ...

  9. SITE-LEVEL SUMMARY of FINAL-2ND-QUARTER-FY-2014-SCORECARD-02...

    Office of Environmental Management (EM)

    ... FORECAST DATE ACTUAL DATE EA DATE STATUS NARRATIVE VARIANCE NARRATIVE REGULATORY AGREEMENT NAME DESIGNATIONS GREEN SHADED DATES ARE 2ND QUARTER FY 2014 MILESTONES ARRA Project: ...

  10. SITE-LEVEL SUMMARY (2Q) of FINAL-2ND-QUARTER-FY-2015-SCORECARD...

    Office of Environmental Management (EM)

    ... FORECAST DATE ACTUAL DATE EA DATE STATUS NARRATIVE VARIANCE NARRATIVE REGULATORY AGREEMENT NAME DESIGNATIONS GREEN SHADED DATES ARE 2ND QUARTER FY 2015 MILESTONES ARRA Project: ...

  11. SITE-LEVEL SUMMARY (3Q) of FINAL-3RD-QUARTER-FY-2014-SCORECARD...

    Office of Environmental Management (EM)

    ... FORECAST DATE ACTUAL DATE EA DATE STATUS NARRATIVE VARIANCE NARRATIVE REGULATORY AGREEMENT NAME DESIGNATIONS GREEN SHADED DATES ARE 3RD QUARTER FY 2014 MILESTONES ARRA Project: ...

  12. Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 9

    SciTech Connect (OSTI)

    Tim Richter

    2005-03-02

    This ninth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DEFC04- 2002AL68080 presents the project status at the end of December 2004, and covers activities in the ninth project quarter, October - December 2004.

  13. Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 13

    SciTech Connect (OSTI)

    Tim Richter

    2006-03-23

    This thirteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of December 2005, and covers activities in the thirteenth project quarter, October 2005 ? December 2005.

  14. Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 18

    SciTech Connect (OSTI)

    Tim Richter

    2007-03-31

    This eighteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of March 2007, and covers activities in the eighteenth project quarter, January 2007 – March 2007.

  15. Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 10

    SciTech Connect (OSTI)

    Tim Richter

    2005-05-05

    This tenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-2002AL68080 presents the project status at the end of March 2005, and covers activities in the tenth project quarter, January-March 2005.

  16. Lessons Learned Quarterly Report, December 2014 | Department...

    Energy Savers [EERE]

    Lessons Learned Quarterly Report, December 2014 Lessons Learned Quarterly Report, December 2014 Welcome to the 81st quarterly report on lessons learned in the NEPA process. This...

  17. Actinide Research Quarterly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARQ A publication of the Glenn T. Seaborg Institute for Transactinium Science. Latest Issue:August 2015 ARQ past issues covers All Issues » submit Actinide Research Quarterly (ARQ) ARQ is a publication of the Glenn T. Seaborg Institute for Transactinium Science, a part of the LANL National Security Education Center. The Actinide Research Quarterly reports on research in actinide science in areas such as process chemistry, metallurgy, surface and separation sciences, atomic and molecular

  18. Contracts for field projects and supporting research on enhanced oil recovery. Quarterly progress review No. 85, October 1, 1995--December 31, 1995

    SciTech Connect (OSTI)

    Godley, P.; Waisley, S.

    1996-12-01

    This documents presents progress on enhanced oil recovery programs and reservoir characterization programs. Information is presented on contract numbers, awards, investigators, and project managers.

  19. BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

    SciTech Connect (OSTI)

    Dougan, P.M.

    1980-03-20

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  20. ARI Quarterly Newsletter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARI Quarterly Newsletter ARI Quarterly Newsletter FINAL ARI Quarterly - 23 Sep 2013.pdf (1.03 MB) More Documents & Publications ARI Quarterly Newsletter ARI: Creating a 2020 DOE ARI Brochure Revitalizing American Competitiveness in Solar Technologies

  1. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  2. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  3. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995

    SciTech Connect (OSTI)

    1996-06-01

    This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

  4. Quarterly Coal Report, April-June 1985

    SciTech Connect (OSTI)

    Not Available

    1985-10-18

    The Quarterly Coal Report provides comprehensive information about coal production, exports, imports, receipts, consumption, and stocks in the United States. The data presented in this report were collected and published by the Energy Information Administration (EIA) to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275) as amended. This issue shows detailed quarterly data for April-June 1985, aggregated quarterly historical and projected data for 1980 through 1986, and aggregated annual historical and projected data for 1960 through 1995. All data for 1984 and previous years are final. All 1985 data are preliminary and subject to revision. During the first and second quarters of 1985, the US coal industry continued to return to normal operations after the threat of a strike by US coal miners in 1984. For the first 6 months of 1985 the industry showed the following developments: Coal production was only 2.4% less than in the same period of 1984, when it reached a record January-June total. Coal exports were 10.0% higher than their 1984 level for the same time period. The United States imported 52.3% more coal than it did in the first 6 months of 1984, chiefly from Colombia. Domestic coal consumption reached a record-setting level for January-June, 3.6% greater than the previous record in 1984.

  5. EMSL Quarterly Highlights Report: FY09, 4th Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

    2009-10-21

    This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

  6. EMSL Quarterly Highlights Report: 4th Quarter, FY08

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2008-11-24

    This report outlines the science highlights, publications, and other happenings at EMSL in 4th quarter of FY08.

  7. EMSL Quarterly Highlights Report: FY09, 3rd Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

    2009-07-17

    This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

  8. quarterly | OpenEI Community

    Open Energy Info (EERE)

    quarterly Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 15 March, 2013 - 10:23 Quarterly Smart Grid Data available for download on OpenEI data download...

  9. ARM - ARM Operations Quarterly Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Quarterly Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  10. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  11. Wind Program Newsletter: First Quarter 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Newsletter: First Quarter 2012 Wind Program Newsletter: First Quarter 2012 Turbines in U.S. Waters Will Soon Spin Wind into Electricity In the News Current R&D Funding Opportunities Recent Publications Turbines in U.S. Waters Will Soon Spin Wind into Electricity DOE releases Offshore Demonstration Project Solicitation The U.S. Department of Energy Wind Program is joining forces with other federal and state government agencies, international partners, industry, technology leaders, and the

  12. 1st Quarter 2016 Domestic Uranium Production Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Table 1. Total production of uranium concentrate in the United States, 1996 - 1st quarter 2016 pounds U 3 O 8 Calendar-year quarter 1st quarter 2nd quarter 3rd quarter 4th quarter ...

  13. Lessons Learned Quarterly Report, September 1995

    Broader source: Energy.gov [DOE]

    This quarterly report summarizes the lessons learned for documents completed between April 1 and June 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs. The report includes a Question and Answer section as well as guidance on selected topics.

  14. Hybrid 320 Ton Off Highway Haul Truck: Quarterly Technical Status Report 11, DOE/AL68080-TSR11

    SciTech Connect (OSTI)

    Tim Richter

    2005-09-26

    This eleventh quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2005, and covers activities in the eleventh project quarter, April 2005-June 2005.

  15. Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 19, DOE/AL68080-TSR19

    SciTech Connect (OSTI)

    Tim Richter

    2007-06-30

    This nineteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2007, and covers activities in the nineteenth project quarter, April 2007 – June 2007.

  16. DOE Issues 86th Lessons Learned Quarterly Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6th Lessons Learned Quarterly Report DOE Issues 86th Lessons Learned Quarterly Report March 2, 2016 - 11:07am Addthis The 86th Lessons Learned Quarterly Report highlights practices to improve NEPA implementation for environmental justice and public access to references; these practices remind us of NEPA's emphasis on meaningful public involvement. Addthis Related Articles Promoting NEPA Transparency and Public Engagement Secretarial Memorandum on Integrating Project Management with NEPA

  17. U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2015 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  18. U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2015 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  19. U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2015 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  20. U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2015 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  1. U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2015 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  2. U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2015 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  3. U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2015 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  4. U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2015 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2015 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  5. U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  6. U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  7. U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  8. U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  9. Conceptual design assessment for the co-firing of bio-refinery supplied lignin project. Quarterly report, June 23--July 1, 2000

    SciTech Connect (OSTI)

    Berglund, T.; Ranney, J.T.; Babb, C.L.

    2000-07-27

    The Conceptual Design Assessment for the Co-Firing of Bio-Refinery Supplied Lignin Project was successfully kicked off on July 23, 2000 during a meeting at the TVA-PPI facility in Muscle Shoals, AL. An initial timeline for the study was distributed, issues of concern were identified and a priority actions list was developed. Next steps include meeting with NETL to discuss de-watering and lignin fuel testing, the development of the mass balance model and ethanol facility design criteria, providing TVA-Colbert with preliminary lignin fuel analysis and the procurement of representative feed materials for the pilot and bench scale testing of the hydrolysis process.

  10. Integrated low emission cleanup system for direct coal-fueled turbines (electrostatic agglomeration). Project quarterly report, September 1, 1991--December 31, 1991

    SciTech Connect (OSTI)

    Quimby, J.M.

    1992-02-01

    The objective of this contract is to investigate the removal of SO{sub x} and particulate matter from direct coal-fired combustion gas streams at high temperature and high pressure conditions. This investigation will be accomplished through a bench-scale testing and evaluation program employing sorbent mixed with a coal-water slurry for SO{sub x} removal, and an innovative particulate control concept. The particulate control device utilizes electrostatic agglomeration followed by a high efficiency mechanical collector (cyclone). The process goal is to achieve particulate collection efficiency better than that required by the 1979 new source performance standards. An additional goal is to demonstrate 70% SO{sub x} removal efficiency. This research project is now in the second of a 3 phase (Phase II) project. Phase II is to fabricate the combustor and particulate control devices and install the system at a test facility located at Research-Cottrell`s, KVB Western Laboratory, Santa Ana, CA. There are three functional categories, or tasks which are to be completed in sequence. These tasks are itemized as follows: Design, procurement, and installation; Shakedown and startup; Reporting. Attempts to validate the concept of electrostatic agglomeration were not possible in the shakedown program before budget constraints halted the program. What was learned was that electrostatic precipitation is feasible in the temperature range of 1600--1800{degrees}F and at pressures above 10 atmospheres.

  11. Stockpile Stewardship Quarterly

    National Nuclear Security Administration (NNSA)

    1, Number 3 * October 2011 Message from the Assistant Deputy Administrator for Stockpile Stewardship, Chris Deeney Comments Questions or comments regarding the Stockpile Stewardship Quarterly should be directed to Terri.Batuyong@nnsa.doe.gov Technical Editor: Chris Werner, Publication Editor: Millicent Mischo Defense Programs Stockpile Stewardship in Action Volume 1, Number 3 Inside this Issue 2 Simulation: A Window into the Detonation of High Explosives 3 Modeling of High-Explosive Detonation

  12. Quarterly Progress Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2016 Quarterly Nuclear Deployment Scorecard - April 2016 News Updates On April 12 NRC held a public meeting in Oak Ridge, Tennessee to discuss Tennessee Valley Authority's (TVA) plans to submit an Early Site Permit (ESP) application to potentially site a small modular reactor at their Clinch River Site.TVA's ESP application will use a Plant Parameter Envelope approach to provide sufficient bounding parameters and characteristics of the reactors and the associated facilities so that

  13. Quarterly Business Review FY 2009 2nd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix - Detailed Power and Transmission Services Income Statements MAY 2009 QUARTERLY BUSINESS REVIEW 3 This information has been made publicly available by BPA on May 20, 2009...

  14. EMSL Quarterly Highlights Report: 2nd Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-05-04

    This report outlines the highlights, staff and user accomplishments, and publications that occured during FY09, 2nd quarter at EMSL.

  15. Domestic Uranium Production Report - Quarterly

    Gasoline and Diesel Fuel Update (EIA)

    1. Total production of uranium concentrate in the United States, 1996 - 2nd Quarter 2016 pounds U3O8 Calendar-year quarter 1st quarter 2nd quarter 3rd quarter 4th quarter Calendar-year total 1996 1,734,427 1,460,058 1,691,796 1,434,425 6,320,706 1997 1,149,050 1,321,079 1,631,384 1,541,052 5,642,565 1998 1,151,587 1,143,942 1,203,042 1,206,003 4,704,574 1999 1,196,225 1,132,566 1,204,984 1,076,897 4,610,672 2000 1,018,683 983,330 981,948 973,585 3,975,545 2001 709,177 748,298 628,720 553,060

  16. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

  17. 2014 Second Quarter Financial Review

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    from operations outpaced capital expenditure in recent quarters, the energy companies' free cash flow increased 12 annualized free cash flow billion 2014 Source: U.S. Energy...

  18. FTCP Quarterly Indicator Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Indicator Reports FTCP Quarterly Indicator Reports July 29, 2016 FTCP Quarterly Report on Federal Technical Capability, July 29, 2016 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls. May 13, 2016 FTCP Quarterly Report on Federal

  19. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Quarterly Business Review August 2, 2011 Follow Ups B O N N E V I L L E P O W E R A D M I N I S T R A T I O N AUGUST 2010 QUARTERLY BUSINESS REVIEW This information has been made...

  20. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November Quarterly Business Review Follow Ups Posted November 15, 2011 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NOVEMBER 2011 QUARTERLY BUSINESS REVIEW This...

  1. Quarterly Nuclear Deployment Scorecard - October 2015 | Department...

    Energy Savers [EERE]

    Quarterly Nuclear Deployment Scorecard - October 2015 Quarterly Nuclear Deployment Scorecard - October 2015 News Updates The Nuclear Regulatory Commission has issued an operating...

  2. Cray Quarterly Meeting!

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MG2 team) ! ! Cray Quarterly Meeting! July 22, 2015 NESAP CESM MG2 Update CESM NESAP MG2 Team Members * NCAR: John Dennis, Chris K err, S ean S antos * Cray: M arcus W agner * Intel: N adezhda P lotnikova, M artyn C orden * NERSC L iaison: Helen H e --- 2 --- MG2 Kernel * MG2 i s a k ernel f or C ESM t hat r epresents i ts radia>ve transfer w orkload. T ypically c onsumes a bout 1 0% o f C ESM run > me. - Brought t o D ungeon S ession i n M arch * Kernel is core bound - Not b andwidth l

  3. Cray Quarterly Meeting!

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    XGC1 team)! ! Cray Quarterly Meeting! July 22, 2015 NESAP XGC1 Dungeon Update XGC1 NESAP Team Members * Name w ith * : A -ended t he D ungeon S ession * Code T eam: - PPPL: C.S. C hang ( PI), S eung---Hoe K u, J ianying L ang*, S tephan Ethier, Robert H ager - ORNL: E d D 'Azevedo*, P at W orley - LBNL: M ark A dams - RPI: E isung Y oon* - A g ood m ix o f p hysics, p erformance a nd l ibrary p eople * Cray: N athan W ichmann* * Intel: T hanh P hung, D mitry N emirov*, A ntonio V alles* * NERSC

  4. Coal gasification. Quarterly report, July-September 1979

    SciTech Connect (OSTI)

    1980-07-01

    The status of 18 coal gasification pilot plants or supporting projects supported by US DOE is reviewed under the following headings: company involved, location, contract number, funding, gasification process, history, process description, flowsheet and progress in the July-September 1979 quarter. (LTN)

  5. Coal liquefaction. Quarterly report, July-September 1979

    SciTech Connect (OSTI)

    1980-07-01

    The status of coal liquefaction pilot plants supported by US DOE is reviewed under the following headings: company involved, location, contract, funding, process name, process description, flowsheet, history and progress during the July-September 1979 quarter. Supporting projects such as test facilities, refining and upgrading coal liquids, catalyst development, and gasification of residues from coal gasification plants are discussed similarly. (LTN)

  6. Low-rank coal research. Quarterly technical progress report, April-June 1984

    SciTech Connect (OSTI)

    Not Available

    1984-08-01

    Papers in the quarterly technical progress report for the period April-June, 1984, of the Low-Rank Coal Research project have been entered individually into EDB and ERA (17 items). (LTN)

  7. Mammoth Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Article: Mammoth Geothermal Project Abstract Abstract unavailable. Authors Ben Holt and Richard G. Campbell Published Journal Geo-Heat Center Quarterly Bulletin, 1984 DOI Not...

  8. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2nd Quarter Forecast. Unfortunately, any positive impact on the future end-of-year net revenue forecast is likely to be mitigated by continuing low market prices. - The Northwest...

  9. Quarterly coal report, July--September 1997

    SciTech Connect (OSTI)

    1998-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

  10. U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 1st Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State

  11. U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 1st Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation

  12. U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic coal distribution, by origin State, 2nd Quarter 2012 Origin: Alabama (thousand short tons) Coal Destination State Transportation

  13. U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 2nd Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State

  14. U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2014 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 2nd Quarter 2014 Destination: Alabama (thousand short tons) Coal Origin State

  15. dgw_cmod_quarterly.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    laboratory experiments, to develop and test a model for the trap formation and fuel migration that can explain the observations. 2 C-Mod Quarterly Oct 2010 Reminder of C-Mod...

  16. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Gasoline and Diesel Fuel Update (EIA)

    Information Administration | Quarterly Coal Distribution Report 4th Quarter 2013 ... Table DS-1. Domestic Coal Distribution, by Destination State, 4th Quarter 2013 ...

  17. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Gasoline and Diesel Fuel Update (EIA)

    Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2013 ... Table OS-1. Domestic Coal Distribution, by Origin State, 3rd Quarter 2013 Origin: Alabama ...

  18. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012 ... Table OS-1. Domestic Coal Distribution, by Origin State, 4th Quarter 2012 Origin: Alabama ...

  19. U.S. Energy Information Administration | Quarterly Coal Distribution...

    U.S. Energy Information Administration (EIA) Indexed Site

    Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2012 ... Table DS-1. Domestic coal distribution, by destination State, 3rd Quarter 2012 ...

  20. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012 ... Table DS-1. Domestic Coal Distribution, by Destination State, 4th Quarter 2012 ...

  1. U.S. Energy Information Administration | Quarterly Coal Distribution...

    U.S. Energy Information Administration (EIA) Indexed Site

    Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2014 ... Table OS-1. Domestic Coal Distribution, by Origin State, 2nd Quarter 2014 Origin: Alabama ...

  2. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2013 ... Table DS-1. Domestic Coal Distribution, by Destination State, 3rd Quarter 2013 ...

  3. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013 ... Table OS-1. Domestic Coal Distribution, by Origin State, 2nd Quarter 2013 Origin: Alabama ...

  4. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Information Administration | Quarterly Coal Distribution Report 4th Quarter 2013 ... Table OS-1. Domestic Coal Distribution, by Origin State, 4th Quarter 2013 Origin: Alabama ...

  5. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Gasoline and Diesel Fuel Update (EIA)

    Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2012 ... Table OS-1. Domestic coal distribution, by origin State, 3rd Quarter 2012 Origin: Alabama ...

  6. U.S. Energy Information Administration | Quarterly Coal Distribution...

    U.S. Energy Information Administration (EIA) Indexed Site

    Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012 ... Table DS-1. Domestic coal distribution, by destination State, 2nd Quarter 2012 ...

  7. U.S. Energy Information Administration | Quarterly Coal Distribution...

    Gasoline and Diesel Fuel Update (EIA)

    Information Administration | Quarterly Coal Distribution Report 1st Quarter 2014 ... Table DS-1. Domestic Coal Distribution, by Destination State, 1st Quarter 2014 ...

  8. U.S. Energy Information Administration | Quarterly Coal Distribution...

    U.S. Energy Information Administration (EIA) Indexed Site

    Information Administration | Quarterly Coal Distribution Report 1st Quarter 2014 ... Table OS-1. Domestic Coal Distribution, by Origin State, 1st Quarter 2014 Origin: Alabama ...

  9. Natural Gas Imports and Exports - Third Quarter Report 2012 ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report ...

  10. Natural Gas Imports and Exports - First Quarter Report 2011 ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report ...