Powered by Deep Web Technologies
Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Laboratory Management (Quality) Systems  

Science Conference Proceedings (OSTI)

Laboratory Management (Quality) Systems. NISTIR 7028 Type Evaluation Quality Manual Template. This NISTIR has been ...

2012-05-02T23:59:59.000Z

2

Quality System Documentation Management  

Science Conference Proceedings (OSTI)

Quality System Documentation Management. ... Minutes, summaries, or notes from Management Meetings of significance are archived here. ...

2012-08-21T23:59:59.000Z

3

A Total Energy & Water Quality Management System  

Science Conference Proceedings (OSTI)

This report develops a generic model for an energy and water quality management system for the water community, and defines standard specifications for software applications required to minimize energy costs within the constraints of water quality and operation goals.

1999-09-30T23:59:59.000Z

4

Fuzzy theory applied in quality management of distributed manufacturing system: A literature review and classification  

Science Conference Proceedings (OSTI)

Fuzzy theory has been regarded as a very important technique for quality management (QM) of distributed manufacturing system and attracts the attentions of academic and industry; however, there is a lack of a comprehensive literature review and a classification ... Keywords: Classification, Clustering analysis, Distributed manufacturing network, Fuzzy theory, Quality management

Lv Yaqiong; Lee Ka Man; Wu Zhang

2011-03-01T23:59:59.000Z

5

THE RELATIONSHIP BETWEEN THE IMPLEMENTATION OF THE ISO 9000 QUALITY MANAGEMENT SYSTEM AND EDUCATIONAL OUTCOMES OF SCHOOLS.  

E-Print Network (OSTI)

??With an ever growing public concern over the quality of education, an increasing number of K-12 schools are adopting the ISO 9000 quality management system.… (more)

Bae, Sang Hoon

2006-01-01T23:59:59.000Z

6

Quality through Managed Improvement and Measurement (QMIM): Towards a Phased Development and Implementation of a Quality Management System for a Software Company  

Science Conference Proceedings (OSTI)

The paper describes results of a longitudinal study of developments in the area of software product and process quality improvement within a Hungarian software company, IQSOFT Ltd. This company has been active in this area since 1993, trying to build, ... Keywords: improvement, longitudinal case study, measurement, product and process quality, quality management system

Katalin Balla; Theo Bemelmans; Rob Kusters; Jos Trienekens

2001-11-01T23:59:59.000Z

7

NIST Intranet Quality System Links  

Science Conference Proceedings (OSTI)

Safety. Environmental Management System. NIST Quality System Resources. Assessor Resources. MSAG Website. Dates and Deadlines. ...

2012-08-21T23:59:59.000Z

8

The Challenges of Developing and Integrating a Quality Management System in a Research and Development Organization  

SciTech Connect

Tailoring a quality management system to the specific needs of an organization is difficult to say the least. The existence of quality system models and standards help facilitate this process immensely. However, what does an organization do when its work is so unique that quality system models and standards do not exist for it? This and other obstacles are what the Nonproliferation, Arms Control, and International Security (NAI) Directorate at Lawrence Livermore National Laboratory (LLNL) encountered during strategic initiatives to develop and integrate a new quality management system. This paper will answer this question to help similar initiatives by: Introducing NAI and its unique mission, organization, history, culture and the security environment in which it operates; Examining the obstacles to designing and integrating NAI's quality management system; Discussing the steps taken to ensure success of the strategic quality initiatives; Presenting the quality management system and plan that resulted from these efforts; Presenting the improvements in NAI and LLNL that resulted from these strategic initiatives; and Presenting lessons learned and practical recommendations.

Ryan, E.; Werne, R.W.

2000-08-01T23:59:59.000Z

9

Distrbuted Sensing Systems for Water Quality Assesment and Management  

E-Print Network (OSTI)

in these systems: computer science, electrical engineering,the Electrical Engineering and Computer Science Department.of Computer Science (joint appointment in Electrical

2007-01-01T23:59:59.000Z

10

Taking compliance patterns and quality management system (QMS) framework approach to ensure medical billing compliance  

Science Conference Proceedings (OSTI)

The United States Office of Inspector General (OIG) has issued a number of compliance guidelines including third-party medical billing guidelines for healthcare companies in the United States to reduce errors and fraud in the field of medical billing. ... Keywords: ISO 9001, OIG, common audit framework, medical billing compliance patterns, quality management system (QMS)

Syeda Uzma Gardazi, Arshad Ali Shahid

2013-03-01T23:59:59.000Z

11

State of worksite health promotion in companies with and without Quality-Management systems: A comparative study  

Science Conference Proceedings (OSTI)

The goal of comprehensive worksite health promotion (WHP) is to protect and promote the health and performance of employees. WHP principles link health-promotion activities to existing management systems, such as Quality Management (QM), to better integrate ... Keywords: Dissemination, Ergonomics, Health and safety, Quality Management, Worksite health promotion

Georg F. Bauer; Frithjof Müller; Alice Inauen; Mark Brink; Thomas Laeubli

2010-09-01T23:59:59.000Z

12

Office of Quality Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Data. To meet these missions, the Office of Quality Management: Develops and revises DOE Regulations and Orders concerning Restricted Data, Formerly Restricted Data,...

13

A network hierarchical feedback system for Taiwanese universities based on the integration of total quality management and innovation  

Science Conference Proceedings (OSTI)

An increasing number of Taiwanese universities are improving operational performance through innovation and total quality management (TQM). In addition, the National Quality Award (NQA), which is based on TQM, is now used to evaluate quality performance ... Keywords: Decision-making trial and evaluation laboratory (DEMATEL), Fuzzy analytical hierarchical process (FAHP), Fuzzy analytical network process (FANP), Gray relational analysis (GRA), Network hierarchical feedback system (NHFS)

Jui-Kuei Chen; I-Shuo Chen

2012-08-01T23:59:59.000Z

14

Quality Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Management Quality Management Quality Management The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and consistent. The Office of Quality Management also assists other Government agencies to meet the requirements contained in DOE-issued regulations concerning Restricted Data and Formerly Restricted Data. To meet these missions, the Office of Quality Management: Develops and revises DOE Regulations and Orders concerning Restricted Data, Formerly Restricted Data, Transclassified Foreign Nuclear Information, National Security Information, Unclassified Controlled Nuclear Information, and Official Use Only Responds to Mandatory Declassification Review Requests under

15

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PROGRAM .4 Organizational Structure ..4 Management Quality Assurance Functions 5 Planning 5 2.0 PERSONNEL TRAINING AND

Waste Management Group

2006-01-01T23:59:59.000Z

16

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SYSTEMS ENGINEERING PROGRAM: Requirements Management Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist Energy.gov Careers & Internships Policy &...

17

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Design...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SYSTEMS ENGINEERING PROGRAM: Requirements Management Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist Energy.gov Careers & Internships Policy &...

18

Waste Management Quality Assurance Plan  

SciTech Connect

Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

Not Available

1993-11-30T23:59:59.000Z

19

On Managing Texas Rural Water Supply Systems: A Socioeconomic Analysis and Quality Evaluation  

E-Print Network (OSTI)

Research Objectives The study reported here is aimed at evaluating the effectiveness of nonprofit, rural water supply corporations or water systems (hereafter referred to as RWSs) in Texas from a sociological perspective. Specifically, the study has attempted to: 1. Provide an overview of the organizational structure and functioning of RWSs, identifying their existing as well as emerging needs, problems, and suggested solutions. It explores socioeconomic characteristics and patterns of RWSs in Texas. It outlines a history of state and federal regulations and practices through which these systems are structured and actually function. 2. Evaluate the quality and effectiveness of the management of selected RWSs located in different geographical regions of Texas. The evaluation of effectiveness of systems is accomplished through a systematic set of procedures and techniques. These procedures are tested for reliability and validity through empirical data. In addition, the differential levels of program effectiveness of RWSs are elaborated upon by correlating them with relevant socioeconomic variables. 3. Indicate policy and research implications of data for dealing with the future of rural water systems. Expected Contributions The rural populations in the U.S. started experiencing steady increases during the 1970s and early 1980s (Goodwin et al., 1984). Although the rural population growth at the national level showed a few differential trends during mid to late 1980s (Figures 3 and 4 in Appendix A), the state of Texas registered a population influx in many nonmetropolitan areas during the last decade (U.S.D.A., 1990: 11). Overall, a significant portion of Texas' population still resides in rural areas (Texas Department of Water Resources, 1984: 7). However, it appears that a larger number of studies have focused on water-management related problems and issues for urban areas than those for rural communities in Texas (e.g., Knudson, 1986; Meier and Thorton, 1973; Murdock et al., 1988; Texas Department of Water Resources, 1985; Texas Water Development Board, 1990;1 and U.S. Army Corps of Engineers, 1989). While rural water problems have been examined carefully in several parts of the country, we could not find a single study in Texas systematically examining water-related needs and issues confronting rural communities. The need to study rural water supply has become even more important now because of the challenge faced by small community systems in complying with the provisions of the 1986 Safe Drinking Water Act (SDWA). These small systems, with their limited customer and revenue bases, will face formidable expense in installing new water treatment methods (Jensen, 1990; Long and Stukenberg, 1987: 38; Texas Water Development Board, 1990: 14). The present study is a timely probe into the phenomena of rural water supply. The study is aimed at developing and using a methodology to evaluate the program effectiveness of RWSs. In recent years, interest has mounted for employing the research techniques of social sciences in efforts to assess the effectiveness of public programs. The 1970s and 1980s, decades of rapid-paced growth of RWSs in Texas and elsewhere, were marked by the proliferation of public expenditures. The study uses a set of indicators to identify effectiveness and efficiency of rural water projects. Such measures for analysis and appraisal of these projects may contribute to more informed and intelligent planning for the future. The study is also expected to provide a critical probe and insight into an evaluation methodology that may be used in future studies investigating public programs. To this end, the research reported here is exploratory in nature and may set grounds for more critical studies in the area. The study, for example, develops a baseline against which to measure future changes and trend in rural water supplies in Texas as well as in other parts of the country. Organization of the Report The remaining three-section organ

Singh, R.N.

1991-05-01T23:59:59.000Z

20

Building America Top Innovations 2013 Profile Â… Quality Management System Guidelines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System tools customized for residential construction Management System tools customized for residential construction are ready for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework. Unlike many manufacturing industries, home construction is usually accomplished through the cooperation of several businesses, including the designer; the architect; the builder; site supervisors; HVAC, plumbing, electrical, framing, roofing, insulation and other contractors; manufacturers and suppliers of materials and components, code inspectors, Home Energy Rating System (HERS) raters, and mortgage lenders. Historically, relationships in the residential construction industry are adversarial, with multiple disconnects and conflicts among the builder, subcontractors, material and product suppliers, and manufacturers.

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Building America Top Innovations 2013 Profile Â… Quality Management System Guidelines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

management system tools customized for residential construction management system tools customized for residential construction are ready for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework. Unlike many manufacturing industries, home construction is usually accomplished through the cooperation of several businesses, including the designer; the architect; the builder; site supervisors; HVAC, plumbing, electrical, framing, roofing, insulation and other contractors; manufacturers and suppliers of materials and components, code inspectors, Home Energy Rating System (HERS) raters, and mortgage lenders. Historically, relationships in the residential construction industry are adversarial, with multiple disconnects and conflicts among the builder, subcontractors, material and product suppliers, and manufacturers.

22

Total quality management implementation guidelines  

SciTech Connect

These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

Not Available

1993-12-01T23:59:59.000Z

23

Quality Management Office | Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Management Office The Quality Management Office (QMO) works with the line organizations in the development and delivery of programs, activities and services that integrate...

24

Business System Management Review  

NLE Websites -- All DOE Office Websites (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

25

Non-ferrous Metals Industry Energy Management System Certification...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-ferrous Metals Industry Energy Management System Certification Details about China Quality Certification Center and Energy Management System certifications....

26

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Video Community, Environment Environmental Stewardship Environmental Protection Environmental Management System Environmental Management System An Environmental...

27

South Coast Air Quality Management District  

Science Conference Proceedings (OSTI)

South Coast Air Quality Management District. NVLAP Lab Code: 101567-0. Address and Contact Information: 21865 Copley ...

2013-08-09T23:59:59.000Z

28

Environmental Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Management Systems Technical Assistance Tools Technical Assistance Tool: Integrating Sustainable Practices into Environmental Management Systems , November 2009...

29

Integrating Total Quality Management (TQM) and hazardous waste management  

SciTech Connect

The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ``cradle to grave`` management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ``front-end`` treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ``mixed waste`` at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components.

Kirk, N. [Colorado State Univ., Fort Collins, CO (United States)

1993-11-01T23:59:59.000Z

30

Life Cycle Asset Management - Quality Assurance -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 17 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management Contents GPG-FM-017 March 1996 iii ACKNOWLEDGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Graded Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2. PRINCIPLES AND PROCESSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Goals, Principles and Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1.1 Quality Assurance Goals and Principles . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1.2 Quality Assurance Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.2 Quality Assurance and Project Phases . . . . .

31

A quality management approach to civil engineering  

E-Print Network (OSTI)

A methodology is presented for basing quality improvement decisions in civil engineering design firms upon historical data, statistical methods, and hydrologic modeling techniques. Statistical Process Control (SPC) is a quality management tool that has been used, with great success, in the manufacturing industry for nearly 50 years. The hydrologic techniques used were created by the Soil Conservation Service to generate synthetic storm hydrography. Historical data from an East Texas civil engineering firm are the basis for the research used to determine, chart, and analyze the current system used in the service provided to one of the company's largest clients. The result is the application of a quantifiable method for improving the quality of this service.

Baber, Thomas James

1999-01-01T23:59:59.000Z

32

Quality Assurance Program Plan (QAPP) Waste Management Project  

Science Conference Proceedings (OSTI)

The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

HORHOTA, M.J.

2000-12-21T23:59:59.000Z

33

Quality Assurance: Fundamentals of the DOE Quality System  

NLE Websites -- All DOE Office Websites (Extended Search)

Fundamentals of the DOE Quality System Fundamentals of the DOE Quality System The quality assurance program is a management system involving all organizational components and should not be regarded as the sole domain of any single group. The Order and Rule reflects the concept that all work is a process that can be planned, performed, assessed, and improved. The basic requirements are broken into three categories: MANAGEMENT PERFORMANCE ASSESSMENT This format permits managers, those performing the work, and those assessing the planning implementation, and results of the work to focus on their unique responsibilities in carrying out the provisions of the quality assurance program. The three categories capture the range of activities common to all work, from organizing and staffing to assessing results and

34

Quality Assurance Strategy for Existing Homes: Final Quality Management Primer for High Performing Homes  

SciTech Connect

This guide is designed to help Building America (BA) Teams understand quality management and its role in transitioning from conventional to high performance home building and remodeling. It explains what quality means, the value of quality management systems, the unique need for QMS when building high performing homes, and the first steps to a implementing a comprehensive QMS. This document provides a framework and context for BA teams when they encounter builders and remodelers.

Del Bianco, M.; Taggart, J.; Sikora, J.; Wood, A.

2012-12-01T23:59:59.000Z

35

Research on chinese hydrological data quality management  

Science Conference Proceedings (OSTI)

Data quality has become increasingly important in information constructions and low data quality will influence the decision-making process related to design, operation, and management of hydrology application. Although many researches could be found ... Keywords: assessment, data quality, dimension, improvement

Yufeng Yu; Yuelong Zhu; Jianxin Zhang; Jingjin Jiang

2012-10-01T23:59:59.000Z

36

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

Department of Energy (DOE) Order 414.1C, Quality Assurance,DOE, federal, and state regulations and compliance orders.

Waste Management Group

2006-01-01T23:59:59.000Z

37

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM More Documents & Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM SOFTWARE QUALITY & SYSTEMS...

38

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

39

Establishing the Office of Environmental Management Quality Assurance Corporate Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DISTRIBUTIO DISTRIBUTIO FROM: DAE Y. CHUNG DEPUTY ASSISTA@SECRETARY FOR SAFETY MANAGEMENT AND OPERATIONS SUBJECT: Establishing the Office of Environmental Management Quality Assurance Corporate Board The purpose of this memorandum is to introduce the Office of Environmental Management (EM) Quality Assurance (QA) Corporate Board which implements EM'S policy and guidance and promotes lessons learned and best practices across the sites. The Corporate Board provides the management structure to integrate the independently managed federal and contractor QA Programs into a single corporate entity. The Board serves as a consensus-building body to facilitate institutionalization of a QA Management System across the EM-Complex. The Corporate Board concept originated from the EM Quality Improvement Initiative in

40

Environmental Management System Plan  

E-Print Network (OSTI)

3) environmental management programs, (4) training, (5)Management Programs3-5 Structure and Responsibility.3-6 Training,Management System Plan Program Elements Additional information regarding EMS training

Fox, Robert

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Establishing the Office of Environmental Management Quality Assurance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Establishing the Office of Environmental Management Quality Assurance Corporate Board Establishing the Office of Environmental Management Quality Assurance Corporate Board The...

42

Environmental Management System Plan  

E-Print Network (OSTI)

offices, the EMS Program Program Elements Environmental ManagementOffice of Institutional Assurance as stated in the OQMP. 3-7 • Environmental ManagementEnvironmental Management System Fiscal Year Improve (EMP classification) Integrated Safety Management System International Organization for Standardization Lawrence Berkeley National Laboratory Office

Fox, Robert

2009-01-01T23:59:59.000Z

43

Quality assurance management plan (QAPP) special analytical support (SAS)  

Science Conference Proceedings (OSTI)

It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

LOCKREM, L.L.

1999-05-20T23:59:59.000Z

44

Report: Acquisition, Project Management, and Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acquisition, Project Management, and Quality Assurance Acquisition, Project Management, and Quality Assurance September 30, 2009 Submitted by the EMAB Acquisition and Project Management Subcommittee Background For FY 2009 EMAB was tasked to review the management and delivery of EM's Construction Projects and confirm whether or not the program is headed in the right direction or needs to make some adjustments in order to improve efficiency. EMAB reviewed and discussed the topics of Acquisition and Project Management during its public meetings. The Acquisition and Project Management subcommittee, comprised of Mr. G. Brian Estes, Dr. Lawrence Papay, and Mr. David Swindle, engaged in teleconferences on August 7 and September 4 with EM senior personnel. Findings and Observations Deputy Assistant Secretary Jack Surash provided an update on EM acquisition initiatives, and he

45

DOE Challenge Home Recommended Quality Management Provisions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommended Quality Recommended Quality Management Provisions RECOMMENDED QUALITY MANAGEMENT PROVISIONS QM Provision Builder Documentation & Verification Requirements Rater/Verifier Requirements QM #1: Project Documentation Complete construction documents shall be qualified as Designed to Earn ENERGY STAR and document all additional provisions and specifications required for DOE Challenge Home including mandatory provisions: 2012 IECC envelope insulation levels, ENERGY STAR windows, duct work in conditioned space, hot water distribution requirements requirements for indoor fixtures, EPA Indoor airPLUS checklist, and Renewable Energy Ready Home Checklists. Develop and store construction documents which, at a minimum, shall include all content required to consistently implement

46

Training Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Time ESAF Contacts Calendars User Community Scientific Access Site AccessVisit Training Training Management System Argonne system used to track training requirements and...

47

System and Network Management  

Science Conference Proceedings (OSTI)

This document covers Systems and Network Management Requirements and is the first deliverable in a joint EPRI and Utility User Project to develop Network Management capability for Electric Utility Automation Systems (UAS) using international communication standards such as IEC 61850. The management of substation automation systems is critical since tools are now based, for the most part, on proprietary hardware and software. In modern state-of-the art substations, traditional network management has ...

2012-12-20T23:59:59.000Z

48

Identity Management Systems Program Homepage  

Science Conference Proceedings (OSTI)

Identity Management Systems Program. ... Identity management systems are responsible for the creation, use, and termination of electronic identities. ...

2010-10-05T23:59:59.000Z

49

Integrated plant nutrient management on diversified cropping system in aqua-terrestrial ecosystem for yield potentiality, quality and rural sustainability  

E-Print Network (OSTI)

Agronomic Management of Wetland Crops, published by Kalyanion these aquatic beneficial crops for obtaining higherof aquatic food and non-food crops in neglected way ( Puste,

PUSTE, ANANDAMOY DR.; DE, PRALAY ER.; MAITY, TAPAN KUMAR DR.

2009-01-01T23:59:59.000Z

50

Energy Management Systems  

E-Print Network (OSTI)

This presentation will address results from a pilot project with 10 chemical plants on energy management systems and the development of an energy efficiency plant certification program.

Ferland, K.

2007-01-01T23:59:59.000Z

51

Proposal for a Guide for Quality Management Systems for PV Manufacturing: Supplemental Requirements to ISO 9001-2008  

SciTech Connect

This technical specification provides a guideline for photovoltaic module manufacturers to produce modules that, once the design has proven to meet the quality and reliability requirements, replicate such design in an industrial scale without compromising its consistency with the requirements.

Norum, P.; Sinicco, I.; Eguchi, Y.; Lokanath, S.; Zhou, W.; Brueggemann, G.; Mikonowicz, A.; Yamamichi, M.; Kurtz, S.

2013-06-01T23:59:59.000Z

52

Strategy Guideline: Quality Management in Existing Homes; Cantilever Floor Example  

SciTech Connect

This guideline is designed to highlight the QA process that can be applied to any residential building retrofit activity. The cantilevered floor retrofit detailed in this guideline is included only to provide an actual retrofit example to better illustrate the QA activities being presented. The goal of existing home high performing remodeling quality management systems (HPR-QMS) is to establish practices and processes that can be used throughout any remodeling project. The research presented in this document provides a comparison of a selected retrofit activity as typically done versus that same retrofit activity approached from an integrated high performance remodeling and quality management perspective. It highlights some key quality management tools and approaches that can be adopted incrementally by a high performance remodeler for this or any high performance retrofit. This example is intended as a template and establishes a methodology that can be used to develop a portfolio of high performance remodeling strategies.

Taggart, J.; Sikora, J.; Wiehagen, J.; Wood, A.

2011-12-01T23:59:59.000Z

53

Environmental management system for the organizations to achieve business excellence  

Science Conference Proceedings (OSTI)

The ISO 14000 Environmental Management System (EMS) standards apply to the management system concepts of total quality management (TQM) to the management of an organization's environmental issues and opportunities. It defines the features of an EMS that ... Keywords: ISO, eco-friendly products and services, environmental impact assessment, environmental management systems, environmental planning, environmental policy, pollution

Gurumurthy Vijayan Iyer; Nikos E. Mastorakis

2006-08-01T23:59:59.000Z

54

Lithium battery management system  

SciTech Connect

Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

Dougherty, Thomas J. (Waukesha, WI)

2012-05-08T23:59:59.000Z

55

Quality monitored distributed voting system  

DOE Patents (OSTI)

A quality monitoring system can detect certain system faults and fraud attempts in a distributed voting system. The system uses decoy voters to cast predetermined check ballots. Absent check ballots can indicate system faults. Altered check ballots can indicate attempts at counterfeiting votes. The system can also cast check ballots at predetermined times to provide another check on the distributed voting system. 6 figs.

Skogmo, D.

1997-03-18T23:59:59.000Z

56

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist The following checklist is...

57

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

58

Review and Assessment of Air Quality Management Activities in Texas  

Science Conference Proceedings (OSTI)

Many air quality studies indicate that ozone, fine particulates, and haze are interrelated and often regional in extent. Emission management strategies to mitigate these pollutants are likely to involve regional control measures. This report summarizes recent air quality studies in the State of Texas to support the development of integrated air quality management strategies to meet new air quality standards.

1999-07-02T23:59:59.000Z

59

Integrating Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission Execution by Mission Execution by Integrating our Management Systems Integrating our Management Systems 1 W e e k l y O p e r a t i o n s M e e t i n g N o v e m b e r 1 , 2 0 1 1 M i c h a e l J . W e i s Pulling the Pieces Together for Improving DOE Management to Enable Mission Execution 2 ï‚— Process changes Process changes ï‚— Behavioral changes Behavioral changes ï‚— System changes System changes Process Change Approach Strengthening and Expediting Decision Making 3 Proposed Outcomes Horizontal Integration Incoming DOE Business Crosscutting Issues (i.e. NLDC input) Hi-level Roadblocks Operations Management Council Associate Deputy Secretary Collaborative Action Process Chief Operating Officer Weekly Operations Council (OMC) Super 8 Secretary (ADS) (CAP) Board (COOB) p Meeting Endorsement / Commitment Super 8 US Meetings COO Meetings

60

Environmental Management System Plan  

E-Print Network (OSTI)

Protection Program, DOE Order 450.1A (June 4, 3. DOE Oand Health Reporting, DOE Order 231.1A (1995, as amended).Emergency Management System, DOE Order 151.1B (October 29,

Fox, Robert

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Hanford Sampling Quality Management Plan (HSQMP)  

Science Conference Proceedings (OSTI)

This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user`s guide to the Data Quality Objective process, and a self-assessment checklist.

Hyatt, J.E.

1995-04-28T23:59:59.000Z

62

US South Coast Air Quality Management District SCAQMD | Open Energy  

Open Energy Info (EERE)

South Coast Air Quality Management District SCAQMD South Coast Air Quality Management District SCAQMD Jump to: navigation, search Name US South Coast Air Quality Management District (SCAQMD) Place Diamond Bar, California Zip CA 91765 Product String representation "The SCAQMD's Te ... nate emissions." is too long. References US South Coast Air Quality Management District (SCAQMD)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. US South Coast Air Quality Management District (SCAQMD) is a company located in Diamond Bar, California . References ↑ "US South Coast Air Quality Management District (SCAQMD)" Retrieved from "http://en.openei.org/w/index.php?title=US_South_Coast_Air_Quality_Management_District_SCAQMD&oldid=352623

63

CSP 587: Software Quality Management S. Kan, Software Quality engineering, Addison-Wesley.  

E-Print Network (OSTI)

CSP 587: Software Quality Management Texts S. Kan, Software Quality engineering, Addison hours · Quality Appraisal Programs 5 hours SEI's Capability Maturity Model ISO 9000 Total 45 hours CSP

Heller, Barbara

64

Computer memory management system  

DOE Patents (OSTI)

A computer memory management system utilizing a memory structure system of "intelligent" pointers in which information related to the use status of the memory structure is designed into the pointer. Through this pointer system, The present invention provides essentially automatic memory management (often referred to as garbage collection) by allowing relationships between objects to have definite memory management behavior by use of coding protocol which describes when relationships should be maintained and when the relationships should be broken. In one aspect, the present invention system allows automatic breaking of strong links to facilitate object garbage collection, coupled with relationship adjectives which define deletion of associated objects. In another aspect, The present invention includes simple-to-use infinite undo/redo functionality in that it has the capability, through a simple function call, to undo all of the changes made to a data model since the previous `valid state` was noted.

Kirk, III, Whitson John (Greenwood, MO)

2002-01-01T23:59:59.000Z

65

Purge water management system  

DOE Patents (OSTI)

A purge water management system for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

Cardoso-Neto, Joao E. (North Augusta, SC); Williams, Daniel W. (Aiken, SC)

1996-01-01T23:59:59.000Z

66

Purge water management system  

DOE Patents (OSTI)

A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

Cardoso-Neto, J.E.; Williams, D.W.

1995-01-01T23:59:59.000Z

67

Automated Transportation Management System (ATMS) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management Packaging and Transportation Automated Transportation Management System (ATMS) Automated Transportation Management System (ATMS) The Department of Energy's...

68

NIM (NERSC Information Management) system  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC Information Management (NIM) portal The NERSC Information Management (NIM) system is a web portal used to view and modify user account, usage, and allocations information....

69

Drilling Waste Management Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

The Drilling Waste Management Information System is an online resource for technical and regulatory information on practices for managing drilling muds and cuttings, including...

70

National reconstruction information management system  

Science Conference Proceedings (OSTI)

National Reconstruction Information Management System (NARIMS) is a revolutionary concept designed and developed by the National Reconstruction Bureau, Government of Pakistan, to work as an aid in support of the Local Governments under the Devolution ... Keywords: administration, asset management, community development, decision support, e-governance, financial, geographical information system, human resource management, information management system, local government, monitoring, performance evaluation

Daniyal Aziz; Syed Adnan Shah; Deeba Gilani

2007-12-01T23:59:59.000Z

71

Power management system  

DOE Patents (OSTI)

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

2007-10-02T23:59:59.000Z

72

Training Management Information System  

Science Conference Proceedings (OSTI)

The Training Management Information System (TMIS) is an integrated information system for all training related activities. TMIS is at the leading edge of training information systems used in the nuclear industry. The database contains all the necessary records to confirm the department's adherence to accreditation criteria and houses all test questions, student records and information needed to evaluate the training process. The key to the TMIS system is that the impact of any change (i.e., procedure change, new equipment, safety incident in the commercial nuclear industry, etc.) can be tracked throughout the training process. This ensures the best training can be performed that meets the needs of the employees. TMIS is comprised of six functional areas: Job and Task Analysis, Training Materials Design and Development, Exam Management, Student Records/Scheduling, Evaluation, and Commitment Tracking. The system consists of a VAX 6320 Cluster with IBM and MacIntosh computers tied into an ethernet with the VAX. Other peripherals are also tied into the system: Exam Generation Stations to include mark sense readers for test grading, Production PC's for Desk-Top Publishing of Training Material, and PC Image Workstations. 5 figs.

Rackley, M.P.

1989-01-01T23:59:59.000Z

73

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& SYSTEMS ENGINEERING PROGRAM: Project Planning Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Design Checklist Energy.gov Careers & Internships Policy &...

74

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM : Acceptance Checklist...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& SYSTEMS ENGINEERING PROGRAM: Software Design Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist Energy.gov Careers & Internships Policy &...

75

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

76

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. (Argonne National Lab., Idaho Falls, ID (United States)); Knudson, D.A.; Rosignolo, C.L. (Argonne National Lab., IL (United States))

1992-01-01T23:59:59.000Z

77

Environmental Management System Plan  

SciTech Connect

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

78

A software development tool for improving quality of service in distributed database systems  

Science Conference Proceedings (OSTI)

The Distributed Database Management Systems (DDBMS) are measured by their Quality of Service (QoS) improvements on the real world applications. To analyze the behavior of the distributed database system and to measure its quality of service performance, ...

Ismail Omar Hababeh

2009-12-01T23:59:59.000Z

79

Battery management system  

SciTech Connect

A battery management system is described, comprising: a main battery; main battery charging system means coupled to the main battery for charging the main battery during operation of the main battery charging system means; at least one auxiliary battery; primary switching means for coupling the auxiliary battery to a parallel configuration with the main battery charging system means and with the main battery, where upon both the main battery and the auxiliary battery are charged by the main battery charging system means, the primary switching means also being operable to decouple the auxiliary battery from the parallel configuration; and sensing means coupled to the primary switching means and operable to sense presence or absence of charging current from the main battery charging system means to the main battery, the sensing means being operable to activate the switching means for coupling the auxiliary battery into the parallel configuration during presence of the charging current, wherein the main battery charging system provides a charging signal to the main battery having an alternating current component, and wherein the sensing means includes transformer means coupled to the charging signal for inducing a voltage, the voltage being applied to a switching circuit of the switching means.

Albright, C.D.

1993-07-06T23:59:59.000Z

80

A design of an integrated document system for project management  

Science Conference Proceedings (OSTI)

The paper describes a design model for an integrated document system for project management, which takes into account the key requirement of ensuring consistent and high-quality project management documentation. The model is based on structured documents ... Keywords: document system, model, project management

Iulian Intorsureanu; Rodica Mihalca; Adina Uta; Anca Andreescu

2009-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Environmental management system.  

Science Conference Proceedings (OSTI)

The purpose of the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Management System (EMS) is identification of environmental consequences from SNL/NM activities, products, and/or services to develop objectives and measurable targets for mitigation of any potential impacts to the environment. This Source Document discusses the annual EMS process for analysis of environmental aspects and impacts and also provides the fiscal year (FY) 2010 analysis. Further information on the EMS structure, processes, and procedures are described within the programmatic EMS Manual (PG470222).

Salinas, Stephanie A.

2010-08-01T23:59:59.000Z

82

A deterministic air quality forecasting system for Torino urban area, Italy  

Science Conference Proceedings (OSTI)

An urban air quality forecasting system for Torino city has been developed, within the EU funded project FUMAPEX, to support the prevention and management of urban air pollution episodes. The proposed forecasting system is designed to provide stakeholders ... Keywords: Air quality forecasting, Air quality management, Chemical transport models, Urban air pollution, Urban meteorology

S. Finardi; R. De Maria; A. D'Allura; C. Cascone; G. Calori; F. Lollobrigida

2008-03-01T23:59:59.000Z

83

NIF Projects Controls and Information Systems Software Quality Assurance Plan  

SciTech Connect

Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

Fishler, B

2011-03-18T23:59:59.000Z

84

Non-ferrous Metals Industry Energy Management System Certification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ferrous Metals Industry ferrous Metals Industry Energy Management System Certification China Quality Certification Center Zhigang Wang 1. Importance Energy Management System 2. Pilot Programs of Energy Management System Certification Contents China Quality Certification Center A professional certification body under the General Administration of Quality Supervision, Inspection and Quarantine of the PRC. Member of the following international organizations: IECEE and IQNet. CQC provides the following services; System certification, Product certification and Training . Main Qualifications -State authorized administrator of the Energy Conservation Label -Provides compulsory product certification as outlined by the Certification and Accreditation Administration(CNCA) of the PRC

85

Composition of Management System for Smart Homes  

E-Print Network (OSTI)

The paper addresses modular hierarchical design (composition) of a management system for smart homes. The management system consists of security subsystem (access control, alarm control), comfort subsystem (temperature, etc.), intelligence subsystem (multimedia, houseware). The design solving process is based on Hierarchical Morphological Multicriteria Design (HMMD) approach: (1) design of a tree-like system model, (2) generation of design alternatives for leaf nodes of the system model, (3) Bottom-Up process: (i) multicriteria selection of design alternatives for system parts/components and (ii) composing the selected alternatives into a resultant combination (while taking into account ordinal quality of the alternatives above and their compatibility). A realistic numerical example illustrates the design process of a management system for smart homes.

Levin, Mark Sh; Klapproth, Alexander

2011-01-01T23:59:59.000Z

86

Global Energy Management System  

E-Print Network (OSTI)

Exxon Mobil Corporation has undertaken voluntary actions to continuously improve energy efficiency in our operations for many years. From 1973 to 1999, we improved the energy efficiency of our refineries and chemical plants by over 35 percent - saving the cumulative equivalent of 1.8 billion barrels of oil and reducing carbon dioxide emissions by over 200 million tonnes. In 2000, we redoubled our efforts with deployment of our Global Energy Management System (GEMS), which utilizes international best practices and benchmarking to identify energy efficiencies at each of our refineries and chemical plants. Thus far, we have identified opportunities to improve the energy efficiency of these facilities by an additional 15 to 20 percent. At full implementation, savings are expected to total $500 million to $1 billion per year, with an associated reduction in carbon dioxide emissions of about 10 million tonnes per year - roughly equivalent to removing 1.5 million cars from the world's roads.

Eidt, B. D.

2005-01-01T23:59:59.000Z

87

Computerized training management system  

DOE Patents (OSTI)

A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

1998-08-04T23:59:59.000Z

88

Computerized training management system  

DOE Patents (OSTI)

A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

Rice, Harold B. (Franklin Furnace, OH); McNair, Robert C. (East Setauket, NY); White, Kenneth (Shirley, NY); Maugeri, Terry (Wading River, NY)

1998-08-04T23:59:59.000Z

89

Quality Management | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Management Quality Management Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Services Quality Management Print Text Size: A A A RSS Feeds FeedbackShare Page The ISC provides quality assurance expertise to the Office of Science's site offices in support of their federal oversight of the national laboratories. Effective quality assurance (QA) programs are essential for achieving a high level of efficiency and excellence in the design, construction, operation and maintenance of laboratory facilities, and in

90

NETL: Produced Water Management Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

PWMIS Home Produced Water Management Information System The Produced Water Management Information System is an online resource for technical and regulatory information for managing...

91

Sanitary Sewer System Management Plan  

E-Print Network (OSTI)

Indicators PMT Plant Maintenance Technician POSM Pipeline Observation System Management POTW Publicly OwnedSanitary Sewer System Management Plan Prepared by: Environment, Health and Safety Division to enforce any violation iii-10 Section iv: Operation and Maintenance Program iv iv-a: System mapping iv-2 iv

92

Practical Guide to Vegetable Oil ProcessingChapter 11 Oil Quality Management  

Science Conference Proceedings (OSTI)

Practical Guide to Vegetable Oil Processing Chapter 11 Oil Quality Management Processing eChapters Processing Press Downloadable pdf of Chapter 11 Oil Quality Management from the book ...

93

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network (OSTI)

by WM (when necessary) DOE Orders y J Figure WM QA Programfrom the Quality Assurance DOE Order 5700.6C, the LBL IQAP,2 from ASME NQA-1-1989, DOE Order 5700.6C, Criterion 1, and

Albert editor, R.

2009-01-01T23:59:59.000Z

94

Fuel cell gas management system  

SciTech Connect

A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

DuBose, Ronald Arthur (Marietta, GA)

2000-01-11T23:59:59.000Z

95

Business System Management Review Template  

NLE Websites -- All DOE Office Websites (Extended Search)

F-009 Business System Management Review Template 09_0519 Page 1 of 12 F-009 Business System Management Review Template 09_0519 Page 1 of 12 Company - Business Form Document Title: Business System Management Review Template Document Number: F-009 Rev. 11_0628 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-004, Business System Management Review Notify of Changes: QAM, MGT Referenced Document(s): N/A F-009 Business System Management Review Template 09_0519 Page 2 of 12 Revision History: Rev. Description of Change A Initial Release 09_0519 Format changes made to template (in particular Section 7.0 CAR/PAR/IO reporting) and several edits for clarification and ease of reading. 11_0628 Modified template categories to reflect current process

96

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network (OSTI)

meeting applicable requirements of LBL, DOE, DOT, and otherDOE Orders, and waste management acceptance requirements ofwith the requirements of this QAIMP and DOE Order 1324.2A.

Albert editor, R.

2009-01-01T23:59:59.000Z

97

Management Information Systems (MIS) Sample Occupations  

E-Print Network (OSTI)

Support Specialist Computer and Information Systems Manager Computer Training Specialist Consultant Data Recruiter Knowledge Manager Logistics Manager Management Analysis MIS Director/Specialist Network Securities & Exchange Commission Website Design Companies Wholesale & Retail Companies Operations Manager

Ronquist, Fredrik

98

Lighting system with thermal management system  

DOE Patents (OSTI)

Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

2013-05-07T23:59:59.000Z

99

Safety Management System Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY POLICY Washington, D.C. Approved: 4-25-11 SUBJECT: INTEGRATED SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable the Department's mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. This Policy cancels and supersedes DOE Policy (P) 411.1, Safety Management Functions, Responsibilities, and Authorities Policy, dated 1-28-97; DOE P 441.1, DOE Radiological Health and Safety Policy, dated 4-26-96; DOE P 450.2A, Identifying, Implementing and Complying with Environment, Safety and Health Requirements, dated 5-15-96; DOE P 450.4, Safety Management

100

Nuclear Materials Management & Safeguards System | National Nuclear...  

National Nuclear Security Administration (NNSA)

System Nuclear Materials Management & Safeguards System NMMSS U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System...

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Building International Emergency Management Systems | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Building International Emergency Management Systems | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

102

Development of an Integrated Distribution Management System  

Science Conference Proceedings (OSTI)

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

Schatz, Joe E.

2010-10-20T23:59:59.000Z

103

Earned Value Management System RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earned Value Management System Review Module Earned Value Management System Review Module March 2010 CD-0 O Ea 0 OFFICE OF arned Va C CD-1 F ENVIRO Standard R alue Man Rev Critical Decis CD-2 M ONMENTAL Review Plan agement view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) t System e pplicability D-3 EMENT (EVMS) CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

104

Federal Energy Management Program: Metering Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Metering Systems Metering Systems to someone by E-mail Share Federal Energy Management Program: Metering Systems on Facebook Tweet about Federal Energy Management Program: Metering Systems on Twitter Bookmark Federal Energy Management Program: Metering Systems on Google Bookmark Federal Energy Management Program: Metering Systems on Delicious Rank Federal Energy Management Program: Metering Systems on Digg Find More places to share Federal Energy Management Program: Metering Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency

105

Petascale system management experiences  

Science Conference Proceedings (OSTI)

Petascale HPC systems are among the largest systems in the world. Intrepid, one such system, is a 40,000 node, 556 teraflop Blue Gene/P system that has been deployed at Argonne National Laboratory. In this paper, we provide some background about the ...

Narayan Desai; Rick Bradshaw; Cory Lueninghoener; Andrew Cherry; Susan Coghlan; William Scullin

2008-11-01T23:59:59.000Z

106

A systems view of quality  

E-Print Network (OSTI)

Caterpillar, a leading manufacturer of construction and mining equipment, diesel and natural gas engines and industrial gas turbines, is committed to continually improving the quality of their products. Caterpillar currently ...

Utley, Tana L. (Tana Leigh)

2007-01-01T23:59:59.000Z

107

Quality Services: Solid Wastes, Part 360: Solid Waste Management Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Solid Waste Management 0: Solid Waste Management Facilities (New York) Quality Services: Solid Wastes, Part 360: Solid Waste Management Facilities (New York) < Back Eligibility Agricultural Commercial Fuel Distributor Industrial Institutional Investor-Owned Utility Multi-Family Residential Municipal/Public Utility Rural Electric Cooperative Transportation Utility Program Info State New York Program Type Environmental Regulations Provider NY Department of Environmental Conservation These regulations apply to all solid wastes with the exception of hazardous or radioactive waste. Proposed solid waste processing facilities are required to obtain permits prior to construction, and the regulations provide details about permitting, construction, registration, and operation requirements. The regulations contain specific guidance for land

108

Nuclear Materials Management & Safeguards System | National Nuclear...  

National Nuclear Security Administration (NNSA)

Management & Safeguards System Nuclear Materials Management & Safeguards System NMMSS U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials...

109

System for Award Management (SAM):  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System for Award Management (SAM) System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today because you want to: a) Get a contract with the federal government b) Get a grant from the federal government c) Increase the work you are already doing with the federal government d) Learn new acronyms WHERE DO YOU START? www.sam.gov WHAT IS SAM? The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of * Central Contractor Registry (CCR) * Online Representations & Certifications Application (ORCA) * Excluded Parties List System (EPLS) WHAT DO I NEED TO DO? Create User Account Register or Update Entity Get contracts/grants

110

publication 426-042 Urban Water-Quality Management  

E-Print Network (OSTI)

of water plants. www.ext.vt.edu Produced by Communications and Marketing, College of Agriculture and Lifepublication 426-042 Urban Water-Quality Management Winterizing the Water Garden Lynnette Swanson Traci Gilland, Extension Agent, Portsmouth Water gardens require maintenance throughout the year

Liskiewicz, Maciej

111

Joint Environmental Management System (EMS) Declaration of Conformance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of...

112

Use of Treated Municipal Wastewater as Power Plant Cooling System Makeup Water: Tertiary Treatment versus Expanded Chemical Regimen for Recirculating Water Quality Management  

SciTech Connect

Treated municipal wastewater is a common, widely available alternative source of cooling water for thermoelectric power plants across the U.S. However, the biodegradable organic matter, ammonia-nitrogen, carbonate and phosphates in the treated wastewater pose challenges with respect to enhanced biofouling, corrosion, and scaling, respectively. The overall objective of this study was to evaluate the benefits and life cycle costs of implementing tertiary treatment of secondary treated municipal wastewater prior to use in recirculating cooling systems. The study comprised bench- and pilot-scale experimental studies with three different tertiary treated municipal wastewaters, and life cycle costing and environmental analyses of various tertiary treatment schemes. Sustainability factors and metrics for reuse of treated wastewater in power plant cooling systems were also evaluated. The three tertiary treated wastewaters studied were: secondary treated municipal wastewater subjected to acid addition for pH control (MWW_pH); secondary treated municipal wastewater subjected to nitrification and sand filtration (MWW_NF); and secondary treated municipal wastewater subjected nitrification, sand filtration, and GAC adsorption (MWW_NFG). Tertiary treatment was determined to be essential to achieve appropriate corrosion, scaling, and biofouling control for use of secondary treated municipal wastewater in power plant cooling systems. The ability to control scaling, in particular, was found to be significantly enhanced with tertiary treated wastewater compared to secondary treated wastewater. MWW_pH treated water (adjustment to pH 7.8) was effective in reducing scale formation, but increased corrosion and the amount of biocide required to achieve appropriate biofouling control. Corrosion could be adequately controlled with tolytriazole addition (4-5 ppm TTA), however, which was the case for all of the tertiary treated waters. For MWW_NF treated water, the removal of ammonia by nitrification helped to reduce the corrosivity and biocide demand. Also, the lower pH and alkalinity resulting from nitrification reduced the scaling to an acceptable level, without the addition of anti-scalant chemicals. Additional GAC adsorption treatment, MWW_NFG, yielded no net benefit. Removal of organic matter resulted in pitting corrosion in copper and cupronickel alloys. Negligible improvement was observed in scaling control and biofouling control. For all of the tertiary treatments, biofouling control was achievable, and most effectively with pre-formed monochloramine (2-3 ppm) in comparison with NaOCl and ClO2. Life cycle cost (LCC) analyses were performed for the tertiary treatment systems studied experimentally and for several other treatment options. A public domain conceptual costing tool (LC3 model) was developed for this purpose. MWW_SF (lime softening and sand filtration) and MWW_NF were the most cost-effective treatment options among the tertiary treatment alternatives considered because of the higher effluent quality with moderate infrastructure costs and the relatively low doses of conditioning chemicals required. Life cycle inventory (LCI) analysis along with integration of external costs of emissions with direct costs was performed to evaluate relative emissions to the environment and external costs associated with construction and operation of tertiary treatment alternatives. Integrated LCI and LCC analysis indicated that three-tiered treatment alternatives such as MWW_NSF and MWW_NFG, with regular chemical addition for treatment and conditioning and/or regeneration, tend to increase the impact costs and in turn the overall costs of tertiary treatment. River water supply and MWW_F alternatives with a single step of tertiary treatment were associated with lower impact costs, but the contribution of impact costs to overall annual costs was higher than all other treatment alternatives. MWW_NF and MWW_SF alternatives exhibited moderate external impact costs with moderate infrastructure and chemical conditioner dosing, which makes them (especially

David Dzombak; Radisav Vidic; Amy Landis

2012-06-30T23:59:59.000Z

113

Joint Environmental Management System (EMS) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has...

114

Undo in workflow management systems  

Science Conference Proceedings (OSTI)

Workflow Management Systems are one of the main technology for supporting Business Processes and they need to be as flexible as possible. One relevant issue arising from integration between WfMSs and corporate Information Systems is that of undo strategies, ...

Alessandra Agostini; Giorgio De Michelis; Marco Loregian

2003-06-01T23:59:59.000Z

115

WIMS - Waste Information Management System  

Office of Environmental Management (EM)

Welcome To WIMS Welcome To WIMS Waste Information Management System WIMS new web address: http://www.emwims.org WIMS is developed to provide DOE Headquarters and site waste managers with the tools necessary to easily visualize, understand, and manage the vast volumes, categories, and problems of forecasted waste streams. WIMS meets this need by providing a user-friendly online system to gather, organize, and present waste forecast data from DOE sites. This system provides a method for identification of waste forecast volumes, material classes, disposition pathways, and potential choke points and barriers to final disposition. Disclaimer: Disposition facility information presented is for planning purposes only and does not represent DOE's decisions or commitments. Any selection of disposition facility will be made after technical, economic, and policy considerations.

116

Battery Thermal Management System Design Modeling (Presentation)  

DOE Green Energy (OSTI)

Presents the objectives and motivations for a battery thermal management vehicle system design study.

Kim, G-H.; Pesaran, A.

2006-10-01T23:59:59.000Z

117

Building Technologies Office: Integrated Building Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Building Integrated Building Management System Research Project to someone by E-mail Share Building Technologies Office: Integrated Building Management System Research Project on Facebook Tweet about Building Technologies Office: Integrated Building Management System Research Project on Twitter Bookmark Building Technologies Office: Integrated Building Management System Research Project on Google Bookmark Building Technologies Office: Integrated Building Management System Research Project on Delicious Rank Building Technologies Office: Integrated Building Management System Research Project on Digg Find More places to share Building Technologies Office: Integrated Building Management System Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

118

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

119

Implementing Management Systems-Based Assessments  

SciTech Connect

A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in centralized management systems. The resulting corporate management system gives the appearance of an assembly of multiple, nearly independent operating units. The executive management system maintains these separate units, encouraging autonomy and creativity by establishing a minimum of requirements and procedures. In any organization, senior management has a responsibility to ensure that all operating units are meeting requirements. Part of this responsibility is fulfilled by conducting oversight or assurance activities, to determine the effectiveness of established systems in meeting requirements and performance expectations. Internal independent assessment is one of these assurance activities. Independent appraisals are combined with external audits and appraisals, self-assessments, peer reviews, project reviews, and other internal and external audits (e.g., financial, contractual) for a more complete assurance view. At SNL, internal independent appraisals are performed by the Audit Center, which reports directly to the Executive Vice President. ES&H independent appraisals are the responsibility of the ES&H and Quality Assessments Department, with a staff complement of eight. With our organization's charter to perform internal, independent appraisals, we set out to develop an approach and associated tools, which would be useful in the overall SNL environment and within our resource limitations.

Campisi, John A.; Reese, Robert T.

1999-05-03T23:59:59.000Z

120

Safety Management System Policy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Program Management » Safety » Safety Management Services » Program Management » Safety » Safety Management System Policy Safety Management System Policy Safety Management Systems provide a formal, organized process whereby people plan, perform, assess, and improve the safe conduct of work. The Safety Management System is institutionalized through Department of Energy (DOE) directives and contracts to establish the Department-wide safety management objective, guiding principles, and functions. The DOE safety management system consists of six components: Objective Guiding principles Core functions Mechanisms Responsibilities Implementation Safety Management System Policy More Documents & Publications "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY FAMILIAR LEVEL

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Quality assurance and testing for safety systems  

Science Conference Proceedings (OSTI)

In this paper we identify special quality assurance and test requirements of software for safety systems and show that even the best currently available practices meet these requirements only at very high cost and by application of empirical ...

Herbert Hecht; Myron Hecht

1997-01-01T23:59:59.000Z

122

Using the CIM Conceptualization in Autonomic System Management: the System Management Ontology Project  

E-Print Network (OSTI)

Using the CIM Conceptualization in Autonomic System Management: the System Management Ontology across multiple organizations. The CIM standard #12;schemas, on which system databases on CIM

Calvanese, Diego

123

Nuclear Materials Management & Safeguards System | National Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Jobs Our Jobs Working at NNSA Blog Nuclear Materials Management & Safeguards System Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management &...

124

Ultrasonic fluid quality sensor system  

SciTech Connect

A system for determining the composition of a multiple-component fluid and for determining linear flow comprising at least one sing-around circuit that determines the velocity of a signal in the multiple-component fluid and that is correlatable to a database for the multiple-component fluid. A system for determining flow uses two of the inventive circuits, one of which is set at an angle that is not perpendicular to the direction of flow.

Gomm, Tyler J. (Meridian, ID); Kraft, Nancy C. (Idaho Falls, ID); Phelps, Larry D. (Pocatello, ID); Taylor, Steven C. (Idaho Falls, ID)

2002-10-08T23:59:59.000Z

125

Ultrasonic Fluid Quality Sensor System  

DOE Patents (OSTI)

A system for determining the composition of a multiple-component fluid and for determining linear flow comprising at least one sing-around circuit that determines the velocity of a signal in the multiple-component fluid and that is correlatable to a database for the multiple-component fluid. A system for determining flow uses two of the inventive circuits, one of which is set at an angle that is not perpendicular to the direction of flow.

Gomm, Tyler J. (Meridian, ID); Kraft, Nancy C. (Idaho Falls, ID); Phelps, Larry D. (Pocatello, ID); Taylor, Steven C. (Idaho Falls, ID)

2003-10-21T23:59:59.000Z

126

Energy Management and Control System: Desired Capabilities and Functionality  

SciTech Connect

This document discusses functions and capabilities of a typical building/facility energy management and control systems (EMCS). The overall intent is to provide a building operator, manager or engineer with basic background information and recommended functions, capabilities, and good/best practices that will enable the control systems to be fully utilized/optimized, resulting in improved building occupant quality of life and more reliable, energy efficient facilities.

Hatley, Darrel D.; Meador, Richard J.; Katipamula, Srinivas; Brambley, Michael R.; Wouden, Carl

2005-04-29T23:59:59.000Z

127

Integrated Safety Management (ISM) - System Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

System Descriptions Integrated Safety Management (ISM) ism logo Sample DOE Contractor ISM System Descriptions Sample DOE Site Office ISM System Descriptions DOE HQ Program Office...

128

Quality assurance program for isotopic power systems  

DOE Green Energy (OSTI)

This report summarizes the Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators. The program has been implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described in the report and examples of program decumentation are presented.

Hannigan, R.L.; Harnar, R.R.

1982-12-01T23:59:59.000Z

129

DOCS System Configuration Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering...

130

Nuclear Energy CFD Application Management System  

Science Conference Proceedings (OSTI)

In modeling and simulation (M&S), it is virtually impossible to separately evaluate the effectiveness of the model from the data used because the results produced rely heavily on the interaction between the two. Both the data and the simulation are responsible for achieving the ultimate goal of providing defensible research and development (R&D) products and decisions. It is therefore vital that data verification and validation (V&V) activities, along with stringent configuration management, be considered part of the overall M&S accreditation process. In support of these goals is the Nuclear Energy CFD Application Management System (NE-CAMS) for nuclear system design and safety analysis. Working with Bettis Laboratory and Utah State University, a plan of action is being developed by the Idaho National Laboratory (INL) that will address the highest and most immediate needs to track and manage computational fluid dynamics (CFD) models and experimental data in an electronic database. The database will intrinsically incorporate the Nuclear Regulatory Commission (NRC) approved policies and procedures for quality. The quality requirements will be such that the model and data must conform to the quality specifications outlined by the NRC before they can be entered into the database. The primary focus of this database is CFD V&V for nuclear industry needs and will, in practice, serve as the best practice guideline that will accommodate NRC regulations. Such a database, along with a prescriptive methodology for how to utilize it, will provide the NRC with accepted CFD results that could potentially be used for licensing. NE-CAMS will incorporate data V&V as key precursors to the distribution of nuclear systems design and safety data, ensuring that these data are appropriate for use in a particular M&S application. Verification will be conducted to provide a level of confidence that the data selected are the most appropriate for the simulation and are properly prepared, i.e., they are complete, correct and conform to predefined procedures and requirements. Validation will ensure that the data accurately represent the real world activity that is being simulated, ensuring the analytical quality of the data. The level of detail and stringency applied against the data V&V activities will be based on a graded approach principle; the higher the risk, the more rigorous the V&V activities. For the V&V activities to be complete, it will be necessary to scrutinize the physical and statistical properties of the extracted data during the overall process. Regardless of the specific technique or methodology, data V&V will be an important component of NE-CAMS.

Hyung Lee; Kimberlyn C. Mousseau

2001-09-01T23:59:59.000Z

131

Automated Transportation Management System (ATMS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re evised June 2010 Re evised June 2010 Autom The Depa Transport an integra system al outbound air. Its ea 1989 DOE significant operationa commerce electronic rates, pre transporta users eva shipments opportunit logistics im ATMS is i radioactiv shipments System ATMS is a activities p packaging including materials. common s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al efficiency t e. Today's sy cally prepare s pare shipping ation bills befo aluate carrier s, and use co ties for system mprovements ts capability t ve and other h s in a comple Modules a modular sys performed by g and transpo radioactive a . Its modules shipment info eight bills, rate System Web Applic Carrier Eval Selection Automated

132

Integrated Building Management System (IBMS)  

SciTech Connect

This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

Anita Lewis

2012-07-01T23:59:59.000Z

133

JM to revise DOE G 414.1-1B, Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A  

Directives, Delegations, and Requirements

Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety ...

2013-04-18T23:59:59.000Z

134

System Support for Distributed Energy Management in Modular Operating Systems.  

E-Print Network (OSTI)

??This thesis proposes a novel approach for managing energy in modular operating systems. Our approach enables energy awareness if the resource-management subsystem is distributed among… (more)

Stöß, Jan

2010-01-01T23:59:59.000Z

135

Guidelines for System Security and Information System Management  

Science Conference Proceedings (OSTI)

This document provides a concise set of guidelines and best practices for performing risk assessment, security management, and system management within utility automation networks.

2008-06-09T23:59:59.000Z

136

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

137

EIS-0285: Transmission System Vegetation Management Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission System Vegetation Management Program June 23, 2000 EIS-0285: EPA Notice of Availability of the Final Environmental Impact Statement Transmission System Vegetation...

138

PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM...

139

PIA - EERE Infrastructure-EERE Reviewer Management System | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE Infrastructure-EERE Reviewer Management System PIA - EERE Infrastructure-EERE Reviewer Management System PIA - EERE Infrastructure-EERE Reviewer Management System PIA - EERE...

140

Quality Services: Solid Wastes, Parts 370-376: Hazardous Waste Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Parts 370-376: Hazardous Waste Parts 370-376: Hazardous Waste Management System (New York) Quality Services: Solid Wastes, Parts 370-376: Hazardous Waste Management System (New York) < Back Eligibility Commercial Fed. Government Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Tribal Government Utility Program Info State New York Program Type Safety and Operational Guidelines Provider NY Department of Environmental Conservation These regulations prescribe the management of hazardous waste facilities in New York State. They identify and list different types of hazardous wastes and describe standards for generators, transporters, as well as treatment, storage and disposal facilities. The regulations also define specific types

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Dynamic power management in environmentally powered systems  

Science Conference Proceedings (OSTI)

In this paper a framework for energy management in energy harvesting embedded systems is presented. As a possible example scenario, we focus on wireless sensor nodes which are powered by solar cells. We demonstrate that classical power management solutions ... Keywords: embedded systems, energy harvesting, model predictive control, power management, real-time scheduling, reward maximization

Clemens Moser; Jian-Jia Chen; Lothar Thiele

2010-01-01T23:59:59.000Z

142

Definition: Distribution Management System | Open Energy Information  

Open Energy Info (EERE)

Management System Management System Jump to: navigation, search Dictionary.png Distribution Management System A Distribution Management System (DMS) is a utility IT system capable of collecting, organizing, displaying and analyzing real-time or near real-time electric distribution system information. A DMS can also allow operators to plan and execute complex distribution system operations in order to increase system efficiency, optimize power flows, and prevent overloads. A DMS can interface with other operations applications such as geographic information systems (GIS), outage management systems (OMS), and customer information systems (CIS) to create an integrated view of distribution operations.[1] View on Wikipedia Wikipedia Definition In the recent years, utilization of electrical energy increased

143

Tank waste remediation system configuration management plan  

SciTech Connect

The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

Vann, J.M.

1998-01-08T23:59:59.000Z

144

Understanding the role of trading in water quality management : based on U.S. experience  

E-Print Network (OSTI)

This research demonstrates an overview of the performance of water quality trading programs currently implemented within the U.S. The role of trading in water quality management is identified through systematical comparisons ...

Pharino, Chanathip

2006-01-01T23:59:59.000Z

145

A project management focused framework for assuring quality work processes  

Science Conference Proceedings (OSTI)

Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

1996-10-01T23:59:59.000Z

146

Appendix 1 -Additional iManage Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Additional iManage/Corporate Information Systems - Additional iManage/Corporate Information Systems In addition to STARS, STRIPES, IDW/iPortal, these are corporate systems maintained by the Office of Corporate Information Systems. These systems are currently not included as part of the requirements. Application/Project Automated Time and Attendance (ATAAPS) Budget and Reporting Code System (BARC) Budget Table System (BTS) Consent Order Tracking System (COTS) Consolidated Accounting and Investment System (CAIS) Departmental Audit Report Tracking System (DARTS) - Enhancements Departmental Audit Report Tracking System (DARTS) - Existing Departmental Inventory Management System (DIMS) DOEInfo eMailList ePerformance eRooms (Pensions) External CFO Website Folio (Portfolio Management) Funds Distribution System (FDS)

147

71.3 - Data Reporting ¬タモ Quality Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71.3 (May 2011) 71.3 (May 2011) 1 Data Reporting - Quality Management References Federal Acquisition Regulation (FAR) Subpart 4.6 - Contract Reporting Office of Federal Procurement Policy (OFPP) Guidance - Improving Acquisition Data Quality for FY 2009 and 2010 Policy Flash 2010-82 - Subaward Reporting for Federal Funding and Transparency Act of 2006 (FFATA) Acquisition Guide Chapter 19.0 - Small Business Programs - An Overview Acquisition Guide Chapter 42.15 - Contractor Past Performance Information Acquisition Guide Chapter 42.16 - Reporting Other Contractor Information into Federal Awardee Performance and Integrity Information System U.S. DOE Data Quality Plan Guiding Principle Procurement Directors are responsible for ensuring that their contracting staff complete all

148

The role of risk-based prioritization in total quality management  

SciTech Connect

The climate in which government managers must make decisions grows more complex and uncertain. All stakeholders - the public, industry, and Congress - are demanding greater consciousness, responsibility, and accountability of programs and their budgets. Yet, managerial decisions have become multifaceted, involve greater risk, and operate over much longer time periods. Over the last four or five decades, as policy analysis and decisions became more complex, scientists from psychology, operations research, systems science, and economics have developed a more or less coherent process called decision analysis to aid program management. The process of decision analysis - a systems theoretic approach - provides the backdrop for this paper. The Laboratory Integrated Prioritization System (LIPS) has been developed as a systems analytic and risk-based prioritization tool to aid the management of the Tri-Labs` (Lawrence Livermore, Los Alamos, and Sandia) operating resources. Preliminary analyses of the effects of LIPS has confirmed the practical benefits of decision and systems sciences - the systematic, quantitative reduction in uncertainty. To date, the use of LIPS - and, hence, its value - has been restricted to resource allocation within the Tri-Labs` operations budgets. This report extends the role of risk-based prioritization to the support of DOE Total Quality Management (TQM) programs. Furthermore, this paper will argue for the requirement to institutionalize an evolutionary, decision theoretic approach to the policy analysis of the Department of Energy`s Program Budget.

Bennett, C.T.

1994-10-01T23:59:59.000Z

149

Integrated Requirements Management System and System Design Description  

Science Conference Proceedings (OSTI)

This document provides a System Design Description (SDD) for the Integrated Requirements Management System (IRMS) database. The database manager chosen for this task was the Dynamic Object Oriented Requirements System (DOORS) Version 5.0 or greater. The schema for the IRMS is described with respect to the CH2M Hill Hanford Group, Inc requirements management processes.

ACREE, C.D.

2001-03-27T23:59:59.000Z

150

Architecting dependable systems with proactive fault management  

Science Conference Proceedings (OSTI)

Management of an ever-growing complexity of computing systems is an everlasting challenge for computer system engineers. We argue that we need to resort to predictive technologies in order to harness the system's complexity and transform a vision of ...

Felix Salfner; Miroslaw Malek

2010-01-01T23:59:59.000Z

151

Environmental Management Systems (Iowa) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) < Back Eligibility Local Government Municipal/Public Utility Tribal Government Program Info State Iowa Program Type Environmental Regulations Fees Training/Technical Assistance Siting and Permitting Provider Iowa Department of Natural Resources A solid waste planning area (e.g., the land encompassed by a municipality with a comprehensive solid waste management policy) may qualify to be an Environmental Management System if it provides multiple environmental services in addition to solid waste disposal and plans for the continuous improvement of solid waste management by appropriately and aggressively mitigating the environmental impacts of solid waste disposal, including greenhouse gas emissions reduction measures. Environmental Management

152

iManage Strategic Integrated Procurement Enterprise System (STRIPES...  

NLE Websites -- All DOE Office Websites (Extended Search)

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management iManage Strategic Integrated Procurement Enterprise System...

153

PIA - iManage Strategic Integrated Procurement Enterprise System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic...

154

PIA - iManage Strategic Integrated Procurement Enterprise System...  

NLE Websites -- All DOE Office Websites (Extended Search)

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic Integrated...

155

A model for international border management systems.  

SciTech Connect

To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

Duggan, Ruth Ann

2008-09-01T23:59:59.000Z

156

Methodical Construction of Database Management Systems  

E-Print Network (OSTI)

Although more and more database management systems are being developed, constructing such systems in an engineering fashion remains an open problem. An engineering attitude towards construction not only tells how to implement a database management system, but also tries to minimize construction time. Hence, the prime objective of an engineering-style construction approach is construction efficiency.

Andreas Geppert; Erlangung Der; Philosophischen Doktorwrde; Vorgelegt Der; Begutachtet Von; Den Herren; K. R. Dittrich; K. Bauknecht; Prof Dr; Prof Dr; Prof Dr; M. Glinz

1994-01-01T23:59:59.000Z

157

Software Quality Assurance Control of Existing Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2.01.00 - 2002 2.01.00 - 2002 Software Quality Assurance Control of Existing Systems September 2002 United States Department of Energy Albuquerque Operations Office Abstract Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. Many of these systems are experiencing support problems. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included. SQA Control of Existing Systems SQAS22.01.00-2002

158

Contractor Earned Value Management System Certification Status...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Centers Field Sites Power Marketing Administration Other Agencies You are here Home Contractor Earned Value Management System Certification Status Contractor Earned...

159

Nuclear Materials Management & Safeguards System CONTACT INFORMATION...  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System CONTACT INFORMATION UPDATE REPORTING IDENTIFICATION SYMBOL (RIS) RIS: Address: Facility Name: CONTACTS Business Name PhoneFax...

160

Power management system - Energy Innovation Portal  

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in ...

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ORISE: Asset Readiness Management System (ARMS)  

NLE Websites -- All DOE Office Websites (Extended Search)

How ORISE is Making a Difference Asset Readiness Management System (ARMS) Tracks Emergency Response Exercises and Equipment Developed by the Oak Ridge Institute for Science and...

162

Quality of service-oriented software systems (QUASOSS 2010)  

Science Conference Proceedings (OSTI)

The 2nd International Workshop on the Quality of Service-Oriented Software Systems (QUASOSS 2010) brought together researchers and practitioners to assess current approaches for analyzing the quality of service-oriented software systems. Due to the current ...

Heiko Koziolek; Steffen Becker; Jens Happe; Paul Pettersson

2010-10-01T23:59:59.000Z

163

Indoor Air Quality Impacts of Residential HVAC Systems ...  

Science Conference Proceedings (OSTI)

Page 1. NISTIR 5559 Indoor Air Quality Impacts of Residential HVAC Systems Phase 11.AReport: Baseline and Preliminary Simulations ...

1997-09-03T23:59:59.000Z

164

Distributed Systems for Energy Management  

NLE Websites -- All DOE Office Websites (Extended Search)

buildings-to-grid, responsive loads, on-line monitoring of efficiency programs, microgrids, and other forms of distributed resource management. A key challenge will be the...

165

Environmental Information Management System (EIMS)  

NLE Websites -- All DOE Office Websites (Extended Search)

from BNL's environmental sampling programs. Applications are available to users to query, display, export and print data as well as several data management utilities,...

166

The Dark Energy Survey Data Management System  

SciTech Connect

The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

Mohr, Joseph J.; /Illinois U., Urbana, Astron. Dept. /Illinois U., Urbana; Barkhouse, Wayne; /North Dakota U.; Beldica, Cristina; /Illinois U., Urbana; Bertin, Emmanuel; /Paris, Inst. Astrophys.; Dora Cai, Y.; /NCSA, Urbana; Nicolaci da Costa, Luiz A.; /Rio de Janeiro Observ.; Darnell, J.Anthony; /Illinois U., Urbana, Astron. Dept.; Daues, Gregory E.; /NCSA, Urbana; Jarvis, Michael; /Pennsylvania U.; Gower, Michelle; /NCSA, Urbana; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

2008-07-01T23:59:59.000Z

167

The Dark Energy Survey Data Management System  

E-Print Network (OSTI)

The Dark Energy Survey collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at NCSA and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used Teragrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

Joseph J. Mohr; Wayne Barkhouse; Cristina Beldica; Emmanuel Bertin; Y. Dora Cai; Luiz da Costa; J. Anthony Darnell; Gregory E. Daues; Michael Jarvis; Michelle Gower; Huan Lin; leandro Martelli; Eric Neilsen; Chow-Choong Ngeow; Ricardo Ogando; Alex Parga; Erin Sheldon; Douglas Tucker; Nikolay Kuropatkin; Chris Stoughton

2008-07-16T23:59:59.000Z

168

Substation based data interpretation techniques for improved power system management  

Science Conference Proceedings (OSTI)

There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

Booth, C.; McDonald, J.R. [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering; Laycock, W.J.

1997-04-01T23:59:59.000Z

169

Scalable data management in distributed information systems  

Science Conference Proceedings (OSTI)

In the era of cloud computing and huge information systems, distributed applications should manage dynamic workloads; i.e., the amount of client requests per time unit may vary frequently and servers should rapidly adapt their computing efforts to those ... Keywords: NoSQL, cloud computing, data management, distributed system, high availability, scalability

M. Remedios Pallardó-Lozoya; Javier Esparza-Peidro; José-Ramón García-Escrivá; Hendrik Decker; Francesc D. Muñoz-Escoí

2011-10-01T23:59:59.000Z

170

THERMAL PERFORMANCE OF MANAGED WINDOW SYSTEMS  

E-Print Network (OSTI)

PERFORMANCE OF MANAGED WINDOW SYSTEMS S. E. Selkowitz and V.York, N.Y. , (1971). Windows for Energy Efficient Buildings,thermal performance of a window system are its overall heat

Selkowitz, S. E.

2011-01-01T23:59:59.000Z

171

iManage: Policy-Driven Self-management for Enterprise-Scale Systems  

E-Print Network (OSTI)

iManage: Policy-Driven Self-management for Enterprise-Scale Systems Vibhore Kumar, Brian F. Cooper of an adminis- trator's needs. In our iManage system we have developed a policy-driven system modeling framework that aims to bridge the gap between manageable compo- nents and manageable systems. In particular, iManage

Eisenhauer, Greg S.

172

Fuzzy expert system for the detection of episodes of poor water quality through continuous measurement  

Science Conference Proceedings (OSTI)

In order to prevent and reduce water pollution, promote a sustainable use, protect the environment and enhance the status of aquatic ecosystems, this article deals with the application of advanced mathematical techniques designed to aid in the management ... Keywords: Automated measurement networks, Fuzzy inference system, Fuzzy logic, Guadiana river, Water quality system

Cecilio Angulo; Joan Cabestany; Pablo Rodríguez; Montserrat Batlle; Antonio González; Sergio de Campos

2012-01-01T23:59:59.000Z

173

Industry InteractiveProcurement System PIA, Office of Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry InteractiveProcurement System PIA, Office of Management Industry InteractiveProcurement System PIA, Office of Management Industry InteractiveProcurement System PIA, Office...

174

Trends in Energy Management Technologies - Part 5: Effectiveness of Energy Management Systems: What the Experts Say and Case Studies Reveal  

E-Print Network (OSTI)

computerized maintenance management systems (CMMS)). Energymaintenance of mechanical and electrical systems, and management

Webster, Tom

2005-01-01T23:59:59.000Z

175

Integrating RFID with quality assurance system - Framework and applications  

Science Conference Proceedings (OSTI)

A quality assurance system (QAS) is designed and used to inspect product quality, determine causes of abnormal by collecting, analyzing and testing data from the product line, and then determining how an improvement plan should be conducted. By utilizing ... Keywords: Improvement plan, Quality assurance system, Radio frequency identification

Jung Lyu, Jr.; Shiow-Yun Chang; Tung-Liang Chen

2009-10-01T23:59:59.000Z

176

Integrated safety management system verification: Volume 2  

Science Conference Proceedings (OSTI)

Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalization of an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR, 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System (ISMS). Guidance and expectations have been provided to PNNL by incorporation into the operating contract (Contract DE-ACM-76FL0 1830) and by letter. The contract requires that the contractor submit a description of their ISMS for approval by DOE. PNNL submitted their proposed Safety Management System Description for approval on November 25,1997. RL tentatively approved acceptance of the description pursuant to a favorable recommendation from this review. The Integrated Safety Management System Verification is a review of the adequacy of the ISMS description in fulfilling the requirements of the DEAR and the DOE Policy. The purpose of this review is to provide the Richland Operations Office Manager with a recommendation for approval of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and to verify the extent and maturity of ISMS implementation within the Laboratory. Further the review will provide a model for other DOE laboratories managed by the Office of Assistant Secretary for Energy Research.

Christensen, R.F.

1998-08-10T23:59:59.000Z

177

System Engineering Design [Nuclear Waste Management using  

NLE Websites -- All DOE Office Websites (Extended Search)

System Engineering System Engineering Design Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology System Engineering Design Bookmark and Share Two major pieces of electrometallurgical process equipment are the Electrorefiner and the Cathode Processor. NE personnel have been involved in the conceptual design, final design, procurement, manufacture,

178

Definition: Outage Management System | Open Energy Information  

Open Energy Info (EERE)

Outage Management System Outage Management System A software application that can process outage reports from a variety of utility operational systems including SCADA, AMI, and customer phone calls, and display outage information to utility operators. The OMS can help a utility interpret outage information and determine where the likely cause of an outage may be. It can also help the utility optimize its service restoration resources.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/outage_management_system [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Management_System&oldid=502507

179

Integrated safety management system verification: Volume 1  

SciTech Connect

Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These activities are normally conducted during a pre-visit trip to the site. The Team recommends approval of the Integrated Safety Management System Description subject to the resolution of the Areas of Concerns noted here.

Christensen, R.F.

1998-08-12T23:59:59.000Z

180

Systems modelling for effective mine water management  

Science Conference Proceedings (OSTI)

Concerns about the difficulties in securing water have led the Australian coal mining industry to seek innovative ways to improve its water management and to adopt novel strategies that will lead to less water being used and more water being reused. ... Keywords: Mining, Sustainable development, Systems model, Water balance, Water resources management

Claire M. Côte; Chris J. Moran; Christopher J. Hedemann; Christian Koch

2010-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Development of dam safety management system  

Science Conference Proceedings (OSTI)

Recently, we can see an increasing amount of dam damage or failure due to aging, earthquakes occurrence and unusual changes in weather. For this reason, dam safety is gaining more importance than ever before in terms of disaster management at a national ... Keywords: Dam safety, Dam safety issue, Dam safety management system, Field inspection, Instrumentation, Monitoring, Safety evaluation

Jesung Jeon; Jongwook Lee; Donghoon Shin; Hangyu Park

2009-08-01T23:59:59.000Z

182

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

183

Optimal dynamic management of energy systems: implementations ...  

Science Conference Proceedings (OSTI)

Abstract Management of multiple systems to generate energy is important with regard to the costs to incur, the effects on the environment and the flexibility of the ...... The average values of the coefficients were obtained from the dated values of  ...

184

UNCLASSIFIED Nuclear Materials Management & Safeguards System  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: Project Title: Associated Materials: Programmatic RIS Previous Project Number(s) Status Code Allotment Code (S=Supplier, U=User) I authorize that the information listed above is for the NMMSS Program to use as part of the project number conversion process for this facility.

185

Managing trust in distributed agent systems  

Science Conference Proceedings (OSTI)

Software agent technology has attracted much attention for developing various distributed systems, composed of autonomous agents interacting with one another using particular mechanisms and protocols. Such systems provide high-level reconfigurability, ... Keywords: distributed agent systems, security, situation-awareness, trust, trust management

Stephen S. Yau

2006-09-01T23:59:59.000Z

186

Design for an information-management system  

DOE Green Energy (OSTI)

The design of an information management system to assemble, classify, and catalog existing documentation on the development of the Geysers/Calistoga Known Geothermal Resources Area (KGRA) is presented. The study consisted of several components: user need requirements, design of the system, survey of information management systems, and systems analysis and cost proposal. User input concerning information requirements and system characteristics were obtained from interviews (personal and telephone) and a questionnaire. The sample user population expressed a need for the identification and access to relevant information concerning local geothermal development. Furthermore, it was a consensus of opinion that the creation of an information center as a depository for relevant documentation would be useful in meeting information needs. The production of a book catalog utilizing automatic data processing (ADP) and a data base management system (DBMS) approach is proposed. The catalog would contain full bibliographic descriptions for all records as well as abstracts for highly significant documents.

Not Available

1979-03-08T23:59:59.000Z

187

Increase Productivity - Implement Energy Management Systems with Project Management Techniques  

E-Print Network (OSTI)

The Glass Division is the second smallest of Ford Motor Company's 20 odd major divisions. It employs four percent of Ford's people, uses but one and one-half percent of the manufacturing space yet it consumes 20 percent of the energy. As Plant Engineering Manager of this small but active division, I devote a big part of my time on justifying energy expenditures and the means to reduce these costs. Ten years ago energy costs were one tenth of today's costs and just about three percent of the division's operating costs. Now they are approaching twelve percent. We believe that energy management systems would contribute to improved productivity in the manufacturing and fabricating facilities. But instinctiveness is not enough to get the funds approved to install the system. We are planning to conduct a major undertaking to prove feasibility. It will be a methodical plan of action. We have prepared a graphic plan of action of the major work items that have to be done to prepare the feasibility report. This presentation highlights the work associated with completing the feasibility report. From this report we develop the documents required for management approval. And we feel comfortable that this approach will result in having energy management systems installed in our division plants.

Spinner, M. P.

1984-01-01T23:59:59.000Z

188

Software Quality Assurance Control of Existing Systems | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included Software Quality Assurance Control of Existing Systems More Documents & Publications Software Quality Assurance Control of Existing Systems Software Quality: A Guide to Responsibilities and Resources, SQAS

189

Building Energy Monitoring System: Making Energy Manageable  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Monitoring System: Making Energy Manageable Building Energy Monitoring System: Making Energy Manageable Speaker(s): Bob Hunter Date: July 21, 2006 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu For any line-item expense to be managed, it must first be manageable. In most organizations, this means bringing that expense into the budget/forecast/variance cycle at the department and individual level. While energy costs are the second fastest growing for most organizations, they have simply received a pass on individual accountability. TrendPoint provides a patented system for monitoring energy at the department and user-level. By monitoring each circuit, we assign a circuit to a user, each user to a group and each group to a site. Energy budgets can then be created and assigned to departments, allowing energy costs become a part of

190

Concept for Management of the Future Electricity System (Smart...  

Open Energy Info (EERE)

Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System...

191

Use of energy management systems for performance monitoring of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial...

192

Security Analysis and Project Management Systems | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Security Analysis and Project Management Systems SHARE Security Analysis and Project Management Systems ORNL brings together the subject matter experts with programmers to design,...

193

Multiple system modelling of waste management  

Science Conference Proceedings (OSTI)

Highlights: > Linking of models will provide a more complete, correct and credible picture of the systems. > The linking procedure is easy to perform and also leads to activation of project partners. > The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions have developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.

Eriksson, Ola, E-mail: ola.eriksson@hig.se [Profu i Goeteborg AB, Goetaforsliden 13 Nedre, SE 431 34 Moelndal (Sweden); Department of Building, Energy and Environmental Engineering, University of Gaevle, SE 801 76 Gaevle (Sweden); Bisaillon, Mattias, E-mail: mattias.bisaillon@profu.se [Profu i Goeteborg AB, Goetaforsliden 13 Nedre, SE 431 34 Moelndal (Sweden)

2011-12-15T23:59:59.000Z

194

Development of a Seed Cotton Fiber Quality Sensing System For Cotton Fiber Quality Mapping  

E-Print Network (OSTI)

For precision agriculture to work, an automated process to collect spatial-variability data within a field is necessary. Otherwise, data collection is prohibitively expensive and time consuming. Furthermore, to minimize measurement error due to harvesting method, data-collection processes involving normal cotton harvesting and ginning operations must be used. For the case of cotton, an automated prototype system using image processing to measure the micronaire value of cotton fiber during harvest was designed and built in the laboratory. This system was tested with two image-processing algorithms to identify and remove the effects of objects present in the images that were not cotton fiber, and then measure the reflectivity in three Near-Infrared (NIR) wavebands. Both algorithms yielded similar results when used on seed cotton samples. The reflectivity measurement after removing the effects of foreign matter had a strong relationship to standard micronaire measurements (R^2= 0.73 and 0.74 for the ratio-image and single-image algorithms, respectively) with a root mean squared error (RMSE) of 0.28 and 0.27, respectively. The ratio-image pixel classification method classified an average of 58% of the pixels in an image as "cotton", while the single-image method classified an average of 81% of the pixels in each image as cotton. These results do not show as strong a relationship between micronaire and NIR reflectivity of cotton samples as previous research done with very uniform lint cotton calibration samples. This is attributed to the higher content of foreign matter in seed cotton samples. With higher trash cotton and fiber that has not yet been cleaned, results obviously are not as good as when using calibration cotton samples. These results indicate the system can be adapted to perform in-situ measurement of cotton fiber quality, specifically micronaire, and enable harvesters to create quality maps of a field automatically to allow better crop management.

Schielack, Vincent Paul

2011-12-01T23:59:59.000Z

195

Distribution Management Systems Planning Guide  

Science Conference Proceedings (OSTI)

No portion of the electric power grid has been impacted more significantly by the Smart Grid concept than the electric distribution system. In the past, the distribution portion of the system received little attention compared to transmission and generation systems unless the lights went out. Since the dawn of the smart grid era, many electric distribution utilities have transitioned from (or are in the process of transitioning from) a mostly manual, paper-driven business process to electronic ...

2013-03-22T23:59:59.000Z

196

Integration of project management and systems engineering: Tools for a total-cycle environmental management system  

SciTech Connect

An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ``Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.`` This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process.

Blacker, P.B.; Winston, R.

1997-10-01T23:59:59.000Z

197

Integrated Energy and Greenhouse Gas Management System  

E-Print Network (OSTI)

With Climate Change legislation on the horizon, the need to integrate energy reduction initiatives with greenhouse gas reduction efforts is critical to manufactures competitiveness and financial strength going forward. MPC has developed an integrated Energy and Greenhouse Gas Management System that allows companies to reduce energy and carbon intensity at the same time all the while bolstering bottom line performance. Reducing energy use and greenhouse gases is not an option but a necessity today. All manufacturing companies need to develop in-house capabilities to manage these important resources or pay the price of high carbon taxes and/or face a depletion in operating margins. MPC will present a case history highlighting the steps taken, the results obtained and the lessons learned in developing an integrated Energy and Greenhouse Gas Management System with a major industrial manufacturing company in the Midwest. Key subject areas covered include: Integration of Climate Change and Energy Management Strategies- a winning approach to meet the challenge; Turn a potential cost of compliance into a new cash flow source; Leveraging Energy Management Systems to optimize savings; Navigating through the new Greenhouse Gas reporting requirements; Utilizing Plant and Corporate Energy Management Dashboards to Control Energy Consumption and Greenhouse Gas emissions.

Spates, C. N.

2010-01-01T23:59:59.000Z

198

Correlating Power Quality Indices with System Reliability Indices  

Science Conference Proceedings (OSTI)

Energy companies can use better knowledge about existing power quality to target maintenance efforts, to establish a baseline for offering premium power services, and to use as a selling tool to sell sites with high power quality. Unfortunately, most energy companies do not have widespread, long-term records of power quality needed to provide this information. But energy companies often have good historical records of reliability indices for all circuits on their system (System Average Interruption Frequ...

2005-03-30T23:59:59.000Z

199

Trends in Energy Management Technology - Part 4: Review of Advanced Applications in Energy Management, Control, and Information Systems  

E-Print Network (OSTI)

for emerging energy management systems. The second article [of these complex energy management systems. This series ofrelative to energy management systems design, specification,

Yee, Gaymond; Webster, Tom

2003-01-01T23:59:59.000Z

200

Trends in Energy Management Technologies - Part 5: Effectiveness of Energy Management Systems: What the Experts Say and Case Studies Reveal  

E-Print Network (OSTI)

Effectiveness of Energy Management Systems: What the Expertsin Energy Management, Control, and Information Systems. ”of Energy Management, Control, and Information Systems."

Webster, Tom

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Trends in Energy Management Technology - Part 3: State of Practice of Energy Management, Control, and Information Systems  

E-Print Network (OSTI)

for emerging energy management systems. The second report [of these complex energy management systems. This series ofrelative to energy management systems design, specification,

Yee, Gaymond; Webster, Tom

2004-01-01T23:59:59.000Z

202

Application of partial mutual information variable selection to ANN forecasting of water quality in water distribution systems  

Science Conference Proceedings (OSTI)

Recent trends in the management of water supply have increased the need for modelling techniques that can provide reliable, efficient, and accurate representation of the complex, non-linear dynamics of water quality within water distribution systems. ... Keywords: Artificial neural networks, Chlorine disinfection, Chlorine residual forecasting, Input variable selection, Partial mutual information, Water quality modelling

Robert J. May; Graeme C. Dandy; Holger R. Maier; John B. Nixon

2008-10-01T23:59:59.000Z

203

NEAMS Nuclear Waste Management IPSC : evaluation and selection of tools for the quality environment.  

Science Conference Proceedings (OSTI)

The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. These M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. This report documents an evaluation of the needs, options, and tools selected for the NEAMS Nuclear Waste Management IPSC quality environment. The objective of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) program element is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to assess quantitatively the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. This objective will be fulfilled by acquiring and developing M&S capabilities, and establishing a defensible level of confidence in these M&S capabilities. The foundation for assessing the level of confidence is based upon the rigor and results from verification, validation, and uncertainty quantification (V&V and UQ) activities. M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. NEAMS Nuclear Waste Management IPSC V&V and UQ practices and evidence management goals are documented in the V&V Plan. This V&V plan includes a description of the quality environment into which M&S capabilities are imported and V&V and UQ activities are managed. The first phase of implementing the V&V plan is to deploy an initial quality environment through the acquisition and integration of a set of software tools. An evaluation of the needs, options, and tools selected for the quality environment is given in this report.

Bouchard, Julie F.; Stubblefield, William Anthony; Vigil, Dena M.; Edwards, Harold Carter (Org. 1444 : Multiphysics Simulation Technology)

2011-05-01T23:59:59.000Z

204

Tank waste remediation system systems engineering management plan  

Science Conference Proceedings (OSTI)

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

205

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

206

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

207

Project Management and Systems Support | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

208

Project Management and Systems Support | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

209

Ad Hoc mobility management with uniform quorum systems  

Science Conference Proceedings (OSTI)

Keywords: Ad hoc network, balanced incomplete block design, data distribution, mobility management, quorum system, reconfigurable wireless network, uniform quorum system

Zygmunt J. Haas; Ben Liang

1999-04-01T23:59:59.000Z

210

Phase 2 cost quality management assessment report for the Office of Technology Development (EM-50)  

SciTech Connect

The Office of Environmental Management (EM) Head quarters (HQ) Cost Quality Management Assessment (CQMA) evaluated the practices of the Office of Technology Development (EM-50). The CQMA reviewed EM-50 management documents and reported results in the HQ CQMA Phase 1 report (March 1993). In this Assessment Phase, EM-50 practices were determined through interviews with staff members. The interviews were conducted from the end of September through early December 1993. EM-50 management documents (Phase 1) and practices (Phase 2) were compared to the Performance Objectives and Criteria (POCs) contained in the DOE/HQ Cost Quality Management Assessment Handbook. More detail on the CQMA process is provided in section 2. Interviewees are listed in appendix A. Documents reviewed during Phase 2 are listed in appendix B. Section 3 contains detailed observations, discussions, and recommendations. A summary of observations and recommendations is presented.

Not Available

1994-08-01T23:59:59.000Z

211

Cost Quality Management Assessment for the Idaho Operations Office. Final report  

SciTech Connect

The Office of Engineering and Cost Management (EM-24) conducted a Cost Quality Management Assessment of EM-30 and EM-40 activities at the Idaho National Engineering Laboratory on Feb. 3--19, 1992 (Round I). The CQMA team assessed the cost and cost-related management activities at INEL. The Round II CQMA, conducted at INEL Sept. 19--29, 1994, reviewed EM-30, EM-40, EM-50, and EM-60 cost and cost-related management practices against performance objectives and criteria. Round II did not address indirect cost analysis. INEL has made measurable progress since Round I.

NONE

1995-06-01T23:59:59.000Z

212

Software Quality Assurance Control of Existing Systems | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Assurance Control of Existing Systems Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included Software Quality Assurance Control of Existing Systems More Documents & Publications Software Quality Assurance Control of Existing Systems Software Quality: A Guide to Responsibilities and Resources, SQAS

213

LANDSCAPE MANAGEMENT FOR SUSTAINABLE SUPPLIES OF BIOENERGY FEEDSTOCK AND ENHANCED SOIL QUALITY  

Science Conference Proceedings (OSTI)

Agriculture can simultaneously address global food, feed, fiber, and energy challenges provided our soil, water, and air resources are not compromised in doing so. As we embark on the 19th Triennial Conference of the International Soil and Tillage Research Organization (ISTRO), I am pleased to proclaim that our members are well poised to lead these endeavors because of our comprehensive understanding of soil, water, agricultural and bio-systems engineering processes. The concept of landscape management, as an approach for integrating multiple bioenergy feedstock sources, including biomass residuals, into current crop production systems, is used as the focal point to show how these ever-increasing global challenges can be met in a sustainable manner. Starting with the 2005 Billion Ton Study (BTS) goals, research and technology transfer activities leading to the 2011 U.S. Department of Energy (DOE) Revised Billion Ton Study (BT2) and development of a residue management tool to guide sustainable crop residue harvest will be reviewed. Multi-location USDA-Agricultural Research Service (ARS) Renewable Energy Assessment Project (REAP) team research and on-going partnerships between public and private sector groups will be shared to show the development of landscape management strategies that can simultaneously address the multiple factors that must be balanced to meet the global challenges. Effective landscape management strategies recognize the importance of nature’s diversity and strive to emulate those conditions to sustain multiple critical ecosystem services. To illustrate those services, the soil quality impact of harvesting crop residues are presented to show how careful, comprehensive monitoring of soil, water and air resources must be an integral part of sustainable bioenergy feedstock production systems. Preliminary analyses suggest that to sustain soil resources within the U.S. Corn Belt, corn (Zea mays L.) stover should not be harvested if average grain yields are less than 11 Mg ha-1 (175 bu ac-1) unless more intensive landscape management practices are implemented. Furthermore, although non-irrigated corn grain yields east and west of the primary Corn Belt may not consistently achieve the 11 Mg ha-1 yield levels, corn can still be part of an overall landscape approach for sustainable feedstock production. Another option for producers with consistently high yields (> 12.6 Mg ha-1 or 200 bu ac-1) that may enable them to sustainably harvest even more stover is to decrease their tillage intensity which will reduce fuel use, preserve rhizosphere carbon, and/or help maintain soil structure and soil quality benefits often attributed to no-till production systems. In conclusion, I challenge all ISTRO scientists to critically ask if your research is contributing to improved soil and crop management strategies that effectively address the complexity associated with sustainable food, feed, fiber and fuel production throughout the world.

Douglas L. Karlen; David J. Muth, Jr.

2012-09-01T23:59:59.000Z

214

iManage: policy-driven self-management for enterprise-scale systems  

Science Conference Proceedings (OSTI)

It is obvious that big, complex enterprise systems are hard to manage. What is not obvious is how to make them more manageable. Although there is a growing body of research into system self-management, many techniques are either too narrow, focusing ... Keywords: Bayesian networks, enterprise-systems, policies, self-management

Vibhore Kumar; Brian F. Cooper; Greg Eisenhauer; Karsten Schwan

2007-11-01T23:59:59.000Z

215

A Precision Agriculture Approach to Managing Cotton Fiber Quality as a Function of Variable Soil Properties  

E-Print Network (OSTI)

Cotton producers can maximize yield and fiber quality by understanding soil variability throughout the fields, thus receiving premium prices for the cotton lint. A better understanding of how soil water holding capacity affects cotton lint yield and quality can result in improved management practices that can maximize fiber quality while minimizing inputs. The objectives of this study were to 1) create management zones using a soil ECa map, 2) test the usefulness of this map using measurements of lint quality and lint quantity in both irrigated and dryland fields, and 3) determine a relationship between soil water holding capacity fiber quality parameters. The selected site was Texas A&M University s IMPACT center which is located nine miles west of College Station, TX in the Brazos River floodplain. In the 2006 and 2007 growing seasons, 24 measurement locations were selected in a dryland and irrigated cotton field, 12 locations in each field. The sites were selected using a map of soil ECa, three ECa categories and four replications. At each location soil texture, soil water holding capacity, and lint quality (HVI) and quantity were measured. The ECa categories successfully identified significant differences in clay content water holding capacity, lint yield, lint quality, and loan values. The 2006 season was relatively dry. Weather, soil variability, and management affected the yield and yield quality responses. Water availability was not a factor for lint yield or quality in 2007. In this situation, the soil was the primary factor for field heterogeneity. The cotton yield still responded to soil variability but lint quality and loan value was uniform. The uniformity of lint quality and non-uniformity of lint quantity leads to the conclusion that these soils have individual yield thresholds, but without water stress the quality threshold is uniform. This conclusion illuminates opportunities for precision management strategies. One management strategy that may result from this work is to reduce seeding rates in lower production areas of the field, if the plants will compensate for yield to still reach the soils yield potential, perhaps less competition for water would improve lint quality.

Stanislav, Scott

2011-08-04T23:59:59.000Z

216

A Systems Approach to Managing Oil  

E-Print Network (OSTI)

led to the spilling of 11 million gallons of crude oil into the Prince William Sound (PWS), Alaska. Af of 1990 (US Fed- eral Law, 1990). Regionally, the state of Alaskas oil pollution prevention and responseA Systems Approach to Managing Oil Transportation Risk in Prince William Sound Jason R. W. Merrick

van Dorp, Johan René

217

Management and Safety of Transportation Systems  

E-Print Network (OSTI)

Management and Safety of Transportation Systems University Transportation Center for Alabama A N N@eng.ua.edu www.eng.ua.edu Editors: James Cruise, Ph.D. Barbara Moore University Transportation Center for Alabama Transportation Center for Alabama (UTCA). The contents of this Annual Report reflect the views of the editors

Carver, Jeffrey C.

218

Business Manangement System(BMS), RL-2008/Project Hanford Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work...

219

PIA - HSS Electronic Visitor Management System (HSEVMS) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Sites Power Marketing Administration Other Agencies You are here Home PIA - HSS Electronic Visitor Management System (HSEVMS) PIA - HSS Electronic Visitor Management...

220

Earned Value Management System (EVMS) Certifications | U.S. DOE...  

Office of Science (SC) Website

Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC...

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Considerations in the Design of Treatment Best Management Practices (BMPs) to Improve Water Quality  

E-Print Network (OSTI)

This document has been reviewed in accordance with the U.S. Environmental Protection Agency=s peer and administrative review policies and approved for publiction. Mention of trade names, commercial products, or design procedures does not constitute endorsement or recommendation for use. ii Foreword The U.S. Environmental Protection Agency (EPA) is charged by Congress with protecting the Nation’s land, air, and water resources. Under a mandate of national environmental laws, the Agency strives to formulate and implement actions leading to a compatible balance between human activities and the ability of natural systems to support and nurture life. To meet this mandate, EPA’s research program is providing data and technical support for solving environmental problems today and building a science knowledge base necessary to manage our ecological resources wisely, understand how pollutants affect our health, and prevent or reduce environmental risks in the future. The National Risk Management Research Laboratory (NRMRL) is the Agency’s center for investigation of technological and management approaches for preventing and reducing risks from pollution that threaten human health and the environment. The focus of the Laboratory’s research program is on methods and their cost-effectiveness for prevention and control of pollution to air, land, water, and subsurface resources; protection of water quality in public water systems; remediation of contaminated sites, sediments and ground water; prevention and control of indoor air pollution; and restoration of ecosystems. NRMRL collaborates with both public and private sector partners to foster technologies that reduce the cost of compliance and to anticipate emerging problems. NRMRL’s research provides solutions to environmental problems by: developing and promoting technologies that protect and improve the environment; advancing

unknown authors

2002-01-01T23:59:59.000Z

222

Software Management in the LHCb Online System  

E-Print Network (OSTI)

LHCb has a large online IT infrastructure with thousands of servers and embedded systems, network routers and switches, databases and storage appliances. These systems run a large number of different applications on various operating systems. The dominant operating systems are Linux and MS-Windows. This large heterogeneous environment, operated by a small number of administrators, requires that new software or updates can be pushed quickly, reliably and as automated as possible. We present here the general design of LHCb's software management along with the main tools: LinuxFC / Quattor and Microsoft SMS, how they have been adapted and integrated and discuss experiences and problems.

Neufeld, N; Brarda, L; Closier, J; Moine, G; Degaudenzi, H

2009-01-01T23:59:59.000Z

223

Software Management in the LHCb Online System  

E-Print Network (OSTI)

LHCb has a large online IT infrastructure with thousands of servers and embedded systems, network routers and switches, databases and storage appliances. These systems run a large number of different applications on various operating systems. The dominant operating systems are Linux and MS-Windows. This large heterogeneous environment, operated by a small number of administrators, requires that new software or updates can be pushed quickly, reliably and as automated as possible. We present here the general design of LHCb's software management along with the main tools: LinusFC / Quattor, Microsoft SMS and CMT.

Bonaccorsi, E; Closier, J; Degaudenzi, H; Moine, G; Neufeld, N

2009-01-01T23:59:59.000Z

224

Exploration of Management Information System: Pemetreating Business Way  

Science Conference Proceedings (OSTI)

The indispensable role of Management Information Systems is common sense in the buisness and organizaiton circle. The use of Management Information Systems has gone from competitive advantage for few to business necessity for all. Its true value comes ... Keywords: Information management, management information system, information technology

Guo Xiang, Li Yanxiao, Li Weihua

2013-01-01T23:59:59.000Z

225

Trends in Energy Management Technology - Part 3: State of Practice of Energy Management, Control, and Information Systems  

E-Print Network (OSTI)

Computerized Maintenance Management System), and CAFM (maintenance & management G G G G G G G: Hotel Check-In System

Yee, Gaymond; Webster, Tom

2004-01-01T23:59:59.000Z

226

Optimal management of batteries in electric systems  

DOE Patents (OSTI)

An electric system including at least a pair of battery strings and an AC source minimizes the use and maximizes the efficiency of the AC source by using the AC source only to charge all battery strings at the same time. Then one or more battery strings is used to power the load while management, such as application of a finish charge, is provided to one battery string. After another charge cycle, the roles of the battery strings are reversed so that each battery string receives regular management.

Atcitty, Stanley (Albuquerque, NM); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM); Symons, Philip C. (Morgan Hill, CA)

2002-01-01T23:59:59.000Z

227

Measuring information systems service quality: SERVQUAL from the other side  

Science Conference Proceedings (OSTI)

There has been much debate as of late over the use of the SERVQUAL instrument to measure Information Systems service quality. Detractors argue that the difference score leads to unreliable measures and that the dimensionality and validity is erratic. ... Keywords: SERVQUAL, measurement, service quality, user expectations

James J. Jiang; Gary Klein; Christopher L. Carr

2002-06-01T23:59:59.000Z

228

Joint Environmental Management System (EMS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The environmental sustainability aspect promotes and integrates sustainability initiatives such as energy and natural resource conservation, waste minimization, green construction, and use of eco-friendly products and services into all phases of work. U.S. Department of Energy (DOE) Office of Legacy Management (LM) EMS was

229

Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2  

SciTech Connect

This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

Cote, R.F.

1993-11-01T23:59:59.000Z

230

Trends in Energy Management Technology - Part 4: Review of Advanced Applications in Energy Management, Control, and Information Systems  

E-Print Network (OSTI)

for energy and maintenance management. TIEMS is currentlywith a computerized maintenance management system (CMMS 4 ).Berkeley Computerized maintenance management system Fault

Yee, Gaymond; Webster, Tom

2003-01-01T23:59:59.000Z

231

Advanced Nuclear Technology: Supplier Quality Management for New Nuclear Plant Construction Projects  

Science Conference Proceedings (OSTI)

This report provides guidance for new nuclear power plant construction projects on supplier quality-related risks associated with the procurement of materials, equipment, and services intended for use in a safety-related plant application. This guidance takes an in-depth look into the procurement-related challenges that new construction projects face and at measures for overcoming these challenges. A methodology is provided for identifying, managing, evaluating, and mitigating quality-related risks ...

2013-06-26T23:59:59.000Z

232

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

233

A cost/benefit model for insertion of technological innovation into a total quality management program  

E-Print Network (OSTI)

This study provides economic justification for insertion of technological innovation into a total quality management (TQM) program in a remanufacturing environment. One of the core principles of TQM is continuous improvement. A preferred metric for measuring quality improvement is the cost of quality. Traditionally, comprehensive quality cost reports have regularly been issued in a fixed format to identify opportunities for improvement and provide guidelines for improvement over time. However, current research has shown that continuous improvement is enhanced by a quality cost approach that is much more flexible [1]. This approach is based upon exposure of the cost savings directly related to quality improvement. in many cases a process-level engineer, who may not be trained in quality costing techniques, will be responsible for the economic analysis to justify a quality improvement initiative. Research has shown that most engineers, simply do not have the training or experience to adequately cost justify quality improvement. The results of this study provide process-level engineers with a cost/benefit model template, which can be used to cost justify technological improvement based upon total quality costs.

Ratliff, William L

1997-01-01T23:59:59.000Z

234

Review: Knowledge management and knowledge management systems: conceptual foundations and research issues  

Science Conference Proceedings (OSTI)

Knowledge is a broad and abstract notion that has defined epistemological debate in western philosophy since the classical Greek era. In the past few years, however, there has been a growing interest in treating knowledge as a significant organizational ... Keywords: knowledge management, knowledge management review, knowledge management systems, organizational knowledge management, research issues in knowledge management

Maryam Alavi; Dorothy E. Leidner

2001-03-01T23:59:59.000Z

235

Quality Management Proves to be a Sound Investment, Says ...  

Science Conference Proceedings (OSTI)

... traded parent companies--Westinghouse Electric Corp., Xerox Corp., General Motors, IBM, AT&T ... Systems; GM's Cadillac Motor Car Division ...

2011-07-14T23:59:59.000Z

236

A Quality Assurance System for Canadian Hourly Pressure Data  

Science Conference Proceedings (OSTI)

In this study a comprehensive quality assurance (QA) system, which includes the hydrostatic check combined with a statistical homogeneity test, is designed and applied to hourly pressure records (for 1953–2002) from 761 Canadian stations, to ...

Hui Wan; Xiaolan L. Wang; Val R. Swail

2007-11-01T23:59:59.000Z

237

NETL: Energy Analyses -Quality Guidelines for Energy System Studies...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Analyses Quality Guidelines for Energy System Studies for Fossil Energy Plants OVERVIEW Each year the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) and the...

238

ExxonMobil Global Energy Management System  

E-Print Network (OSTI)

For many years, ExxonMobil has undertaken voluntary actions to improve efficiency in our operations and in customer use of our products. Our Global Energy Management System (GEMS) is an important initiative that is having a positive impact at each of our refineries and chemical plants. The system builds on international best practices and benchmarking to identify energy efficiencies. Launched in 2000, it utilizes a common methodology to identify performance gaps, implement closure plans, sustain progress, and drive energy efficiency toward leading-edge performance. The GEMS business model is based on a three-step approach to performance improvement. First, it addresses base case performance issues by operating existing facilities optimally and efficiently through application of best practices. Second, it identifies economic investment opportunities above an optimized base for step-change improvement to address structural differences. Third, the system implements strong management systems to provide the rigor and discipline necessary to sustain progress and drive continuous improvement. Ultimately, management leadership, organizational commitment, and personal accountability all work together to drive continuous improvement.

Roberto, F.

2009-05-01T23:59:59.000Z

239

Real-Time Water Quality Management in the Grassland Water District  

SciTech Connect

The purpose of the research project was to advance the concept of real-time water quality management in the San Joaquin Basin by developing an application to drainage of seasonal wetlands in the Grassland Water District. Real-time water quality management is defined as the coordination of reservoir releases, return flows and river diversions to improve water quality conditions in the San Joaquin River and ensure compliance with State water quality objectives. Real-time water quality management is achieved through information exchange and cooperation between shakeholders who contribute or withdraw flow and salt load to or from the San Joaquin River. This project complements a larger scale project that was undertaken by members of the Water Quality Subcommittee of the San Joaquin River Management Program (SJRMP) and which produced forecasts of flow, salt load and San Joaquin River assimilative capacity between 1999 and 2003. These forecasts can help those entities exporting salt load to the River to develop salt load targets as a mechanism for improving compliance with salinity objectives. The mass balance model developed by this project is the decision support tool that helps to establish these salt load targets. A second important outcome of this project was the development and application of a methodology for assessing potential impacts of real-time wetland salinity management. Drawdown schedules are typically tied to weather conditions and are optimized in traditional practices to maximize food sources for over-wintering wildfowl as well as providing a biological control (through germination temperature) of undesirable weeds that compete with the more proteinaceous moist soil plants such as swamp timothy, watergrass and smartweed. This methodology combines high resolution remote sensing, ground-truthing vegetation surveys using established survey protocols and soil salinity mapping using rapid, automated electromagnetic sensor technology. This survey methodology could be complemented with biological surveys of bird use and invertebrates to produce a robust long-term monitoring strategy for habitat health and sustainability.

Quinn, Nigel W.T.; Hanna, W. Mark; Hanlon, Jeremy S.; Burns, Josphine R.; Taylor, Christophe M.; Marciochi, Don; Lower, Scott; Woodruff, Veronica; Wright, Diane; Poole, Tim

2004-12-10T23:59:59.000Z

240

Group value and intention to use - A study of multi-agency disaster management information systems for public safety  

Science Conference Proceedings (OSTI)

This paper examines and extends the theory of information systems success in the context of large-scale disaster management (DM) for public safety. In the recent past, various evaluation reports on DM efforts have concluded that information quality and ... Keywords: Disaster management, Group value, Information systems success, Intention to use, Public sector, Task support, User satisfaction

JinKyu Lee; Nitesh Bharosa; Jing Yang; Marijn Janssen; H. R. Rao

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The physiology analysis system: An integrated approach for warehousing, management and analysis of time-series physiology data  

Science Conference Proceedings (OSTI)

The physiology analysis system (PAS) was developed as a resource to support the efficient warehousing, management, and analysis of physiology data, particularly, continuous time-series data that may be extensive, of variable quality, and distributed ... Keywords: Data base management system, Data display, Medical informatics, Physiology, Time-series data analysis

Thomas M. McKenna; Gagandeep Bawa; Kamal Kumar; Jaques Reifman

2007-04-01T23:59:59.000Z

242

The Impact of Biofuel and Greenhouse Gas Policies on Land Management, Agricultural Production, and Environmental Quality  

E-Print Network (OSTI)

This dissertation explores the combined effects of biofuel mandates and terrestrial greenhouse gas GHG mitigation incentives on land use, management intensity, commodity markets, welfare, and the full costs of GHG abatement through conceptual and empirical modeling. First, a simple conceptual model of land allocation and management is used to illustrate how bioenergy policies and GHG mitigation incentives could influence market prices, shift the land supply between alternative uses, alter management intensity, and boost equilibrium commodity prices. Later a major empirical modeling section uses the U.S. Forest and Agricultural Sector Optimization Model with Greenhouse Gases (FASOMGHG) to simulate land use and production responses to various biofuel and climate policy scenarios. Simulations are performed to assess the effects of imposing biofuel mandates in the U.S. consistent with the Renewable Fuels Standard of the Energy Independence and Security Act of 2007 (RFS2). Simulations are run for several climate mitigation policy scenarios (with varying GHG (CO2) prices and eligibility restrictions for GHG offset activities) with and without conservation land recultivation. Important simulation outputs include time trajectories for land use, GHG emissions and mitigation, commodity prices, production, net exports, sectoral economic welfare, and shifts in management practices and intensity. Direct and indirect consequences of RFS2 and carbon policy are highlighted, including regional production shifts that can influence water consumption and nutrient use in regions already plagued by water scarcity and quality concerns. Results suggest that the potential magnitude of climate mitigation on commodity markets and exports is substantially higher than under biofuel expansion in isolation, raising concerns of international leakage and stimulating the “Food vs. Carbon” debate. Finally, a reduced-form dynamic emissions trading model of the U.S. economy is developed using simulation output from FASOMGHG and the National Energy Modeling System to test the effect of biofuel mandate expansion and domestic offset eligibility restrictions on total economy-wide GHG abatement costs. Findings are that while the RFS2 raises the marginal costs of offsets, full abatement costs depend on a number of policy factors. GHG payment incentives for forest management and non-CO2 agricultural offsets can increase full abatement costs by more than 20%.

Baker, Justin Scott

2011-05-01T23:59:59.000Z

243

Developing a Novel Framework for Quality System and Systems Thinking to Integrate: A Paradigm Shift in Maintenance  

E-Print Network (OSTI)

Abstract—This paper presents a need of paradigm shift in maintenance system so as to improve performance of overall system in this global competition. It discovers flaws in present day maintenance strategies that were considered to be the rationale behind the need for this new paradigm; changing scheme from a problem solving maintenance to a problem understanding maintenance. To reply to that research gap, this study unveils want in quality system and systems thinking that must have got to be integrated into conception of the existing maintenance strategies. Having had demand for integration of these methodologies, this paper offers a novel framework that enable maintenance operatives to plan maintenance actions through the identification of true root cause of failures and the quest of optimal solutions by viewing problem as a system in its entirety. Unlike current maintenance strategies, the proposed framework will count not only ‘hard ’ factors but also their relationships with nascent ‘soft ’ factors as contributing elements in the cause of failure. It can then be developed from beneficial effect of integration between the Six Sigma and the System Dynamics benefiting from favorable merged characteristics of the two; quality system and systems thinking respectively, along with feedback mechanism. Details construction of the framework is explained thoroughly in every section of this paper. Keywords—cybernetics system engineering, maintenance system, manufacturing management, quality system, systems thinking, system dynamics, six sigma. I.

Hari Agung Yuniarto; Hiroshi Osada

2009-01-01T23:59:59.000Z

244

Communication architecture based power management for battery efficient system design  

Science Conference Proceedings (OSTI)

Communication-based power management (CBPM) is a new battery-driven system-level power management methodology in which the system-level communication architecture regulates the execution of various system components, with the aim of improving battery ... Keywords: battery efficiency, communication architectures, embedded systems, low power design, power management

Kanishka Lahiri; Sujit Dey; Anand Raghunathan

2002-06-01T23:59:59.000Z

245

Long-term fuzzy management of water resource systems  

Science Conference Proceedings (OSTI)

In the present context of water resource scarcity, a complete approach for long-term storage/transfer/distribution system management is proposed. The main management objective of such a kind of system is to manage reserves and releases so as to minimize ... Keywords: fuzzy logic, modeling, optimization, water resource management

Roger Marcelin Faye; Salam Sawadogo; Claude Lishou; Félix Mora-Camino

2003-05-01T23:59:59.000Z

246

Electricity Demand and Energy Consumption Management System  

E-Print Network (OSTI)

This project describes the electricity demand and energy consumption management system and its application to the Smelter Plant of Southern Peru. It is composted of an hourly demand-forecasting module and of a simulation component for a plant electrical system. The first module was done using dynamic neural networks, with backpropagation training algorithm; it is used to predict the electric power demanded every hour, with an error percentage below of 1%. This information allows management the peak demand before this happen, distributing the raise of electric load to other hours or improving those equipments that increase the demand. The simulation module is based in advanced estimation techniques, such as: parametric estimation, neural network modeling, statistic regression and previously developed models, which simulates the electric behavior of the smelter plant. These modules allow the proper planning because it allows knowing the behavior of the hourly demand and the consumption patterns of the plant, in...

Sarmiento, Juan Ojeda

2008-01-01T23:59:59.000Z

247

ISO 50001 Conformant Energy Management Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISO 50001-conformant ISO 50001-conformant Energy Management Systems Aimee McKane Lawrence Berkeley National Laboratory atmckane@lbl.gov 518-782-7002 April 2, 2013 2 | Building Technologies Office eere.energy.gov * Energy efficiency improvements with very favorable payback periods often do not get implemented due to competing organizational priorities * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily

248

ISO 50001 Conformant Energy Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

ISO 50001-conformant ISO 50001-conformant Energy Management Systems Aimee McKane Lawrence Berkeley National Laboratory atmckane@lbl.gov 518-782-7002 April 2, 2013 2 | Building Technologies Office eere.energy.gov * Energy efficiency improvements with very favorable payback periods often do not get implemented due to competing organizational priorities * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily

249

System and method for advanced power management  

DOE Patents (OSTI)

A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

Atcitty, Stanley (Albuquerque, NM); Symons, Philip C. (Surprise, AZ); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM)

2009-07-28T23:59:59.000Z

250

Web-based energy information systems for energy management and demand response in commercial buildings  

E-Print Network (OSTI)

also known as EMS (Energy Management Systems), BMS (Buildingfacility operator or energy management systems, often wasteand Control Systems Energy Management Systems Environmental

Motegi, Naoya; Piette, Mary Ann; Kinney, Satkartar; Herter, Karen

2003-01-01T23:59:59.000Z

251

Simulation of Storage Systems for increasing the Power Quality of Renewable Energy Sources  

E-Print Network (OSTI)

Abstract. The use of renewable energy sources (RES) in electricity generation has many economical and environmental advantages, but has a downside in the instability and unpredictability introduced into the public electric systems. High variable energies such as wind power have a lack of stability and, to avoid short-term variations in power supplied to the grid, a local storage subsystem can be used to provide higher quality in the fed energy. This paper contains a mathematical model and a simulator focused on energy management that may be useful to evaluate the service quality, the energy efficiency and the required storage capacity. Key words

J. Mendez; A. Falcon; D. Hern

2010-01-01T23:59:59.000Z

252

Definition: Meter Data Management System | Open Energy Information  

Open Energy Info (EERE)

System System Jump to: navigation, search Dictionary.png Meter Data Management System A meter data management system (MDMS) collects and stores meter data from a head-end system and processes that meter data into information that can be used by other utility applications including billing, customer information systems, and outage management systems. The MDMS is a key resource for managing large quantities of meter data.[1] Related Terms system, outage management system References ↑ https://www.smartgrid.gov/category/technology/meter_data_management_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Meter_Data_Management_System&oldid=50258

253

An integrated multi-model approach for air quality assessment: Development and evaluation of the OSCAR Air Quality Assessment System  

Science Conference Proceedings (OSTI)

This paper reports on the development and evaluation of a new modelling system for studying air quality on local scales. A multi-model approach has been adopted to develop the OSCAR Air Quality Modelling System to conduct assessments at different levels ... Keywords: Air quality, Model evaluation, Modelling system, Nitrogen oxides, OSCAR, Particulate matter

Ranjeet S. Sokhi; Hongjun Mao; Srinivas T. G. Srimath; Shiyuan Fan; Nutthida Kitwiroon; Lakhumal Luhana; Jaakko Kukkonen; Mervi Haakana; Ari Karppinen; K. Dick van den Hout; Paul Boulter; Ian S. McCrae; Steinar Larssen; Karl I. Gjerstad; Roberto San José; John Bartzis; Panagiotis Neofytou; Peter van den Breemer; Steve Neville; Anu Kousa; Blanca M. Cortes; Ingrid Myrtveit

2008-03-01T23:59:59.000Z

254

Managing Aging Effects on Dry Cask Storage Systems for Extended...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Managing Aging Effects on Dry Cask Storage Systems for Extended Long Term Storage and Transportation of Used Fuel Rev0 Managing Aging Effects on Dry Cask Storage Systems for...

255

Survey Report: Improving Integration of Program Management and Systems Engineering  

E-Print Network (OSTI)

For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

Conforto, Edivandro

256

Dynamic thermal management in chip multiprocessor systems  

E-Print Network (OSTI)

Recently, processor power density has been increasing at an alarming rate result- ing in high on-chip temperature. Higher temperature increases current leakage and causes poor reliability. In our research, we ¯rst propose a Predictive Dynamic Ther- mal Management (PDTM) based on Application-based Thermal Model (ABTM) and Core-based Thermal Model (CBTM) in the multicore systems. Based on predicted temperature from ABTM and CBTM, the proposed PDTM can maintain the system temperature below a desired level by moving the running application from the possi- ble overheated core to the future coolest core (migration) and reducing the processor resources (priority scheduling) within multicore systems. Furthermore, we present the Thermal Correlative Thermal Management (TCDTM), which incorporates three main components: Statistical Workload Estimation (SWE), Future Temperature Estima- tion Model (FTEM) and Temperature-Aware Thread Controller (TATC), to model the thermal correlation e®ect and distinguish the thermal contributions from appli- cations with di®erent workload behaviors at run time in the CMP systems. The pro- posed PDTM and TCDTM enable the exploration of the tradeo® between throughput and fairness in temperature-constrained multicore systems.

Liu, Chih-Chun

2008-08-01T23:59:59.000Z

257

The Development of Quality Assurance and Visualization for Safety Assessment System  

Science Conference Proceedings (OSTI)

Site Information and Total Environmental data management System (SITES) is an integrated program for overall data acquisition, environmental monitoring, and safety analysis. SITES is composed of three main modules such as site database system, safety assessment system and environmental monitoring system named SECURE, SAINT and SUDAL, respectively. SAINT abbreviated for Safety Assessment Integration system is the integrated interface for the radioactive waste safety assessment codes in the SITES. SAINT is developed for the application and analysis of data from SECURE and for the systematic management of the resulted data from the safety assessment. The Quality Assurance module in SAINT is implemented to enhance the reliability of safety assessment results. The visualization in SAINT is purposed of reliability, comprehension of safety assessment results and user's convenience which can easily recognize the assessment results using the geographic information. (authors)

Lak Kim, C.; Yo Yun, B.; Lee, K.J.; Moon Park, S.; Wan Park, J.; Ho Choi, S. [Korea Hydro and Nuclear Power Co. LTD. (KHNP) (Korea, Republic of)

2007-07-01T23:59:59.000Z

258

Project Hanford management contract quality assurance program implementation plan for nuclear facilities  

SciTech Connect

During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

Bibb, E.K.

1997-10-15T23:59:59.000Z

259

Operation Diagnosis for Buildings Connecting Building Management Systems with Energy Management Systems  

E-Print Network (OSTI)

Reducing energy consumption of buildings is a good contribution to protect the environment and to reduce costs. The first and most important step to operate a building most efficiently is to make aware of most of the technical parameters. Connecting or installing a Building Automation Sys-tem with an Energy Management System helps to analyze the flow of material, build up an integrated Alarm Management and create an excellent documentation of the installed base. To pick the best of each and connect the two professional systems is the principle for a successful Operation Diagnosis.

Mehler, G.

2008-01-01T23:59:59.000Z

260

Multimedia-based Medicinal Plants Sustainability Management System  

E-Print Network (OSTI)

Medicinal plants are increasingly recognized worldwide as an alternative source of efficacious and inexpensive medications to synthetic chemo-therapeutic compound. Rapid declining wild stocks of medicinal plants accompanied by adulteration and species substitutions reduce their efficacy, quality and safety. Consequently, the low accessibility to and non-affordability of orthodox medicine costs by rural dwellers to be healthy and economically productive further threaten their life expectancy. Finding comprehensive information on medicinal plants of conservation concern at a global level has been difficult. This has created a gap between computing technologies' promises and expectations in the healing process under complementary and alternative medicine. This paper presents the design and implementation of a Multimedia-based Medicinal Plants Sustainability Management System addressing these concerns. Medicinal plants' details for designing the system were collected through semi-structured interviews and databas...

Omogbadegun, Zacchaeus; Ayo, Charles; Mbarika, Victor; Omoregbe, Nicholas; Otofia, Efe; Chieze, Frank

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Report of the Review of the Hanford Solid Waste Environmental Impact Statement regarding Data Quality Control and Management Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of the Hanford Review of the Hanford Solid Waste Environmental Impact Statement (EIS) Data Quality, Control and Management Issues January 2006 Hanford Solid Waste Environment Impact Statement (EIS) Data Quality, Control and Management Issues Review Report ii Contents EXECUTIVE SUMMARY .................................................................................. IV 1.0 BACKGROUND ................................................................................................................ 1 2.0 REVIEW APPROACH....................................................................................................... 1 3.0 SUMMARY........................................................................................................................ 2 4.0 REVIEW RESULTS........................................................................................................... 4

262

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

263

ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS  

NLE Websites -- All DOE Office Websites (Extended Search)

Objectives & Targets Rev. 7/17/13 Objectives & Targets Rev. 7/17/13 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS 2012 PROGRESS REPORT for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note Target Achieved Details Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce energy and water consumption, reduce impacts to natural resources from facility usage 1) Meter 90% of electricity by September 2012 2) Meter 90% of gas, steam, and water by September 2015 3) 30% energy intensity reduction by 2015 from baseline 2003 4) Reduce water consumption intensity 2%

264

Deducing the complexity to quality of a system using UML  

Science Conference Proceedings (OSTI)

The aspects of quality are that it is unquantifiable trait- it can be discussed, felt and judged, but can not be weighted or measured. To validate software systems early in the development lifecycle is becoming crucial. Early validation of functional ... Keywords: DB database, DRC depth of relationship between classes, IRA inter-relational attributes, IRM and inter-relational methods, KAS number of key attributes, QWUML quality with UML, UML unified modelling language

Shahid Nazir Bhatti

2009-05-01T23:59:59.000Z

265

Quality Assurance: Quality Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy Policy It is the policy of the Department of Energy to establish quality requirements to ensure that risks and environmental impacts are minimized and that safety, reliability, and performance are maximized through the application of effective management systems commensurate with the risks posed by the facility or activity and its work. The Department implements this policy through the QA Order and the QA rule directives to ensure quality assurance requirements are clearly specified for the broad spectrum of work performed by DOE and its contractors. Objective The objective of the QA requirements are to establish an effective management system (i.e., quality assurance programs) using the performance requirements coupled technical standards where appropriate that ensure:

266

Quality of Availability: Replica Placement for Widely Distributed Systems  

E-Print Network (OSTI)

In this paper, we take an availability-centric view on Quality of Service (QoS) and focus on the issues of providing availability guarantees for widely distributed systems such as web servers and peer-to-peer (P2P) file sharing systems.

Giwon On; Jens Schmitt; Ralf Steinmetz

2003-01-01T23:59:59.000Z

267

Data management plan for the Oak Ridge Environmental Information System, Version 1. 1  

Science Conference Proceedings (OSTI)

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

Not Available

1992-08-04T23:59:59.000Z

268

System Demand-Side Management: Regional results  

DOE Green Energy (OSTI)

To improve the Bonneville Power Administration's (Bonneville's) ability to analyze the value and impacts of demand-side programs, Pacific Northwest Laboratory (PNL) developed and implemented the System Demand-Side Management (SDSM) model, a microcomputer-based model of the Pacific Northwest Public Power system. This document outlines the development and application of the SDSM model, which is an hourly model. Hourly analysis makes it possible to examine the change in marginal revenues and marginal costs that accrue from the movement of energy consumption from daytime to nighttime. It also allows a more insightful analysis of programs such as water heater control in the context of hydroelectric-based generation system. 7 refs., 10 figs., 10 tabs.

Englin, J.E.; Sands, R.D.; De Steese, J.G.; Marsh, S.J.

1990-05-01T23:59:59.000Z

269

Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan  

SciTech Connect

The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

1994-01-01T23:59:59.000Z

270

Hazardous Waste Management System-General (Ohio) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System-General (Ohio) Hazardous Waste Management System-General (Ohio) Eligibility Agricultural Industrial Investor-Owned Utility Local Government MunicipalPublic Utility Rural...

271

Federal Energy Management Program: Facility Energy Decision System...  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Energy Decision System Software to someone by E-mail Share Federal Energy Management Program: Facility Energy Decision System Software on Facebook Tweet about Federal...

272

Business Manangement System(BMS), RL-2008/Project Hanford Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

273

The Dark Energy Survey Data Management System  

SciTech Connect

The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

Sevilla, I.; /Madrid, CIEMAT; Armstrong, R.; Jarvis, M.; /Pennsylvania U.; Bertin, E.; /Paris, Inst. Astrophys.; Carlson, A.; Desai, S.; Mohr, J.; /Munich U.; Daues, G.; Gower, M.; Gruendl, R.; Petravick, D.; /Illinois U., Urbana /Illinois U., Urbana /Chicago U. /Fermilab /Brookhaven /Harvard-Smithsonian Ctr. Astrophys.

2011-09-01T23:59:59.000Z

274

Towards semantic performance measurement systems for supply chain management  

Science Conference Proceedings (OSTI)

The literature on Supply Chain Management (SCM) supports the integration of key business processes, including the performance management process, in order to increase the performance within and between the organisations. Nevertheless, the lack of proper ... Keywords: SCOR, business process management, ontology engineering, performance measurement systems, supply chain management

Artturi Nurmi; Thierry Moyaux; Valérie Botta-Genoulaz

2010-10-01T23:59:59.000Z

275

Trends in Energy Management Technology - Part 3: State of Practice of Energy Management, Control, and Information Systems  

E-Print Network (OSTI)

CMMS (Computerized Maintenance Management System), andG: Tenant billing, maintenance & management G G G G G G G:

Yee, Gaymond; Webster, Tom

2004-01-01T23:59:59.000Z

276

Facilities Information Management System (FIMS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facilities Information Management System Facilities Information Management System (FIMS) Facilities Information Management System (FIMS) FIMS is DOE's corporate database for real property as required by DOE Order 430.1B, Real Property Asset Management. The system provides DOE with an accurate inventory and management tool that assists with planning and managing all current real property assets. The DOE Office of Acquisition and Project Management, the Office of Management and Budget, Congress, and other Federal entities use the real property data reported through FIMS. All Office of Legacy Management (LM) real property assets (buildings, trailers, other structures, and land) are entered into FIMS at the time they are acquired. Annually LM is required to update maintenance cost, operating cost, replacement cost, and utilization details for each asset.

277

Review of power quality applications of energy storage systems  

DOE Green Energy (OSTI)

Under the sponsorship of the US Department of Energy (DOE) Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories contracted Sentech, Inc., to assess the impact of power quality problems on the electricity supply system. This report contains the results of several studies that have identified the cost of power quality events for electricity users and providers. The large annual cost of poor power quality represents a national inefficiency and is reflected in the cost of goods sold, reducing US competitiveness. The Energy Storage Systems (ESS) Program takes the position that mitigation merits the attention of not only the DOE but affected industries as well as businesses capable of assisting in developing solutions to these problems. This study represents the preliminary stages of an overall strategy by the ESS Program to understand the magnitude of these problems so as to begin the process of engaging industry partners in developing solutions.

Swaminathan, S.; Sen, R.K. [Sentech, Inc., Bethesda, MD (United States)

1997-05-01T23:59:59.000Z

278

ITS Hardware Maintenance Management Systems: White Paper for MORIP Pooled Fund Study  

E-Print Network (OSTI)

an ITS hardware maintenance management system. It can aid inITS Hardware Maintenance Management Systems: White Paper forITS HARDWARE MAINTENANCE MANAGEMENT SYSTEMS WHITE PAPER For

Kuhn, Beverly T.; Durkop, Brooke R.

2001-01-01T23:59:59.000Z

279

System design and dynamic signature identification for intelligent energy management in residential buildings.  

E-Print Network (OSTI)

of commercial energy management systems, IEEE Transactionsfor intelligent energy management systems of resi- dentialin an intelligent energy management system, three approaches

Jang, Jaehwi

2008-01-01T23:59:59.000Z

280

ITS Hardware Maintenance Management Systems: White Paper for MORIP Pooled Fund Study  

E-Print Network (OSTI)

of an ITS hardware maintenance management system. It can aidBERKELEY ITS Hardware Maintenance Management Systems: WhiteHIGHWAYS ITS HARDWARE MAINTENANCE MANAGEMENT SYSTEMS WHITE

Kuhn, Beverly T.; Durkop, Brooke R.

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Efficiency of critical incident management systems: Instrument development and validation  

Science Conference Proceedings (OSTI)

There is much literature in the area of emergency response management systems. Even so, there is in general a lacuna of literature that deals with the issue of measuring the effectiveness of such systems. The aim of this study is to develop and validate ... Keywords: Critical incident management system (CIMS), Decision support, Emergency response systems, Instrument, Measurement, Media richness theory, National incident management systems (NIMS), Validation

Jin Ki Kim; Raj Sharman; H. Raghav Rao; Shambhu Upadhyaya

2007-11-01T23:59:59.000Z

282

Temperature and cooling management in computing systems  

E-Print Network (OSTI)

72 5.1.2 Memory thermal and cooling model . . . . . . . . 75Energy, Thermal and Cooling Management . . . . . . . .Conclusion . . Chapter 4 Thermal and Cooling Management in

Ayoub, Raid

2011-01-01T23:59:59.000Z

283

Building Technologies Office: Building-Level Energy Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Building-Level Energy Building-Level Energy Management Systems Research Project to someone by E-mail Share Building Technologies Office: Building-Level Energy Management Systems Research Project on Facebook Tweet about Building Technologies Office: Building-Level Energy Management Systems Research Project on Twitter Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Google Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Delicious Rank Building Technologies Office: Building-Level Energy Management Systems Research Project on Digg Find More places to share Building Technologies Office: Building-Level Energy Management Systems Research Project on AddThis.com... About Take Action to Save Energy

284

Prioritizing wood energy crop feedstock qualities for biofuel systems improvement  

SciTech Connect

Knowledge engineering or expert systems is needed in biofuel systems to adequately prioritize wood energy crop traits on which research and development should focus. Objectives at the various stages of the total biofuel process are clarifying the demands that will be placed on feedstock qualities. These objectives are forming more clearly from developments in the growing, handling, and conversion of wood under operational and regulatory circumstances. A process for systematic prioritization of wood qualities for possible improvement is presented in the content of the entire biofuel process.

Ranney, J.W.

1991-01-01T23:59:59.000Z

285

Prioritizing wood energy crop feedstock qualities for biofuel systems improvement  

SciTech Connect

Knowledge engineering or expert systems is needed in biofuel systems to adequately prioritize wood energy crop traits on which research and development should focus. Objectives at the various stages of the total biofuel process are clarifying the demands that will be placed on feedstock qualities. These objectives are forming more clearly from developments in the growing, handling, and conversion of wood under operational and regulatory circumstances. A process for systematic prioritization of wood qualities for possible improvement is presented in the content of the entire biofuel process.

Ranney, J.W.

1991-12-31T23:59:59.000Z

286

Modelling integrated waste management system of the Czech Republic  

Science Conference Proceedings (OSTI)

The paper is devoted to environmental modelling, particularly modelling of Integrated Municipal Solid Waste Management Systems at the Czech Republic (IMSWMS). There are considered input macroeconomic variables (landfills fees, price of electricity, tax ... Keywords: environmental modelling, integrated waste management system, municipal solid waste, waste management modelling

Jiri Hrebicek; Jana Soukopova

2010-07-01T23:59:59.000Z

287

NMMSS Software Quality Assurance Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Plan The Software Quality Assurance Plan (SQAP) for the Nuclear Materials Management and Safeguard System (NMMSS) software upgrade project (an actual DOE...

288

A Prescribed Fire Emission Factors Database for Land Management and Air Quality Applications  

Science Conference Proceedings (OSTI)

The Clean Air Act, its amendments, and air quality regulations require that prescribed fire managers estimate the quantity of emissions that a prescribed fire will produce. Information on emissions is available for these calculations; however, it is often incomplete or difficult to find. Tables and computer models can also provide some of this information, but the quality and applicability of the data to a specific site are unknown. In conjunction with three research projects developing new emissions data and meteorological tools to assist prescribed fire managers, the Resource Conservation and Climate Change Program Area of the Department of Defense's Strategic Environmental Research and Development Program is supporting development of a database that contains emissions information related to prescribed burning. Ultimately the vetted database will be available on the Internet and will contain emissions information that has been developed from laboratory and field-scale measurements and has been published.

Lincoln, Emily; Hao, WeiMin; Baker, S.; Yokelson, Robert J.; Burling, Ian R.; Urbanski, Shawn; Miller, J. Wayne; Weise, David; Johnson, Timothy J.

2010-12-20T23:59:59.000Z

289

Embedded automatic parking management system based on RFID and existed gate system integration  

Science Conference Proceedings (OSTI)

In this paper, an Embedded Automatic Parking Management System (EAPMS) that integrates the existed gate system and RFID is proposed. This system includes Embedded Gate Hardware, Gate-PC Controller, RFID System, Parking Management Platform. Most systems ... Keywords: RFID, embedded, parking management, system integration

Ming-Shen Jian; Kuen Shiuh Yang; Chung-Lun Lee; Nan-Yuan Huang

2008-07-01T23:59:59.000Z

290

Modular RFID parking management system based on existed gate system integration  

Science Conference Proceedings (OSTI)

In this paper, a Modular RFID Parking Management System that integrates the existed gate system and RFID is proposed. This system includes Modular Gate-PC Controller and Embedded Gate Hardware, RFID System, Modular Parking Management Platform. Most systems ... Keywords: RFID, embedded, modular, parking management, system integration

Ming-Shen Jian; Kuen Shiuh Yang; Chung-Lun Lee

2008-06-01T23:59:59.000Z

291

Quality Assurance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assurance Assurance Quality Assurance QUALITY ASSURANCE IN THE DEPARTMENT OF ENERGY DOE has established Quality Policy, Principles and Value Added Requirement Attributes that apply to all work and are focused on performance, customer expectations, and improvement. When properly implemented, the principles and requirements form a management system to plan, perform, assess, and improve work. The requirements are performance oriented and offer unlimited implementation flexibility. The DOE quality management system moves beyond the traditional quality assurance requirements that had become narrowly focused on safety systems, paper, compliance, and inspections. The management system is designed to link with an organization's strategic plan to support mission achievement and the

292

New and Underutilized Technology: Computer Power Management Systems |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Computer Power Management Systems Computer Power Management Systems New and Underutilized Technology: Computer Power Management Systems October 7, 2013 - 9:08am Addthis The following information outlines key deployment considerations for computer power management systems within the Federal sector. Benefits Computer power management systems include network-based software that manages computer power consumption by automatically putting them in standby, hibernation, or other low energy consuming state without interfering with user productivity or IT functions. Application Computer power management systems are applicable in most building categories with high computer counts. Key Factors for Deployment Life-cycle cost effectiveness studies are recommended prior to deployment. Ranking Criteria Federal energy savings, cost-effectiveness, and probability of success are

293

Quality management in environmental programs: Los Alamos National Laboratory`s approach  

SciTech Connect

Since its inception in 1943, Los Alamos National Laboratory`s (LANL`s) primary mission has been nuclear weapons research and development, which involved the use of hazardous and radioactive materials, some of which were disposed of onsite. LANL has established an extensive Environmental Restoration Project (Project) to investigate and remediate those hazardous and radioactive waste disposal sites. This paper describes LANL`s identification and resolution of critical issues associated with the integration and management of quality in the Project.

Maassen, L.; Day, J.L.

1998-03-01T23:59:59.000Z

294

Cask system maintenance in the Federal Waste Management System  

SciTech Connect

In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs.

Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

295

Earned Value Management System RM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earned Value Management System RM Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project management and the acquisition of capital assets is the Earned Value Management System (EVMS). EVMS allows both government and contractor managers to gain significant insights into technical, cost, and schedule progress of contracts and projects. The implementation of an EVMS is widely recognized

296

Essentials of Management Information Systems, 5th edition  

Science Conference Proceedings (OSTI)

From the Publisher:Exceptionally practical in approach, this volume prepares readers for the constantly changing demands of using information systems as managers in today's fast-paced organizations. It relates MIS to management, the organization and ...

Kenneth C. Laudon

2002-05-01T23:59:59.000Z

297

Earned Value Management System RM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earned Value Management System RM Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project management and the acquisition of capital assets is the Earned Value Management System (EVMS). EVMS allows both government and contractor managers to gain significant insights into technical, cost, and schedule progress of contracts and projects. The implementation of an EVMS is widely recognized

298

Farm management systems and the Future Internet era  

Science Conference Proceedings (OSTI)

Smart/precision farming systems are expected to play an important role in improving farming activities. During the past years, sophisticated farm management systems have emerged to replace outdated complex and monolithic farm systems and software tools. ... Keywords: Farm management system, Future Internet, Generic enablers, Internet of Things

Alexandros Kaloxylos; Robert Eigenmann; Frederick Teye; Zoi Politopoulou; Sjaak Wolfert; Claudia Shrank; Markus Dillinger; Ioanna Lampropoulou; Eleni Antoniou; Liisa Pesonen; Huether Nicole; Floerchinger Thomas; Nancy Alonistioti; George Kormentzas

2012-11-01T23:59:59.000Z

299

Operating System Quality of Service Technical White Paper  

E-Print Network (OSTI)

Operating System Quality of Service Technical White Paper White Paper Abstract Within the past few to the applications at the edges of the network. This white paper reviews emerging QoS mechanisms and how after the date of publication. This white paper is for informational purposes only. MICROSOFT MAKES

Schulzrinne, Henning

300

HVAC System Design Strategies to Address Indoor Air Quality Standards  

Science Conference Proceedings (OSTI)

This report describes strategies that can be employed in the design and operation of heating, ventilating, and air conditioning (HVAC) systems to address the ASHRAE Standard 62 "Ventilation for Acceptable Indoor Air Quality" requirements. The report examines a wide variety of approaches to meeting the standard and their impact on energy consumption, occupant comfort, and other factors.

1999-12-09T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Implementing sugarcane quality-based payment systems using a decision support system  

Science Conference Proceedings (OSTI)

In sugar industries where growers and millers are independent economic entities, payment systems aim at sharing the annual sugar industry revenue. Payment systems are designed to create incentives to improve milling performance, cane yield and quality. ... Keywords: By-products, Participatory approach, Payment scheme, Quality incentive, Sugarcane

C. Lejars; S. Auzoux; B. Siegmund; P. Letourmy

2010-01-01T23:59:59.000Z

302

Indoor Air Quality Primer for HVAC System Design  

Science Conference Proceedings (OSTI)

Heating, ventilating, and air conditioning (HVAC) systems are major energy users in commercial and institutional buildings. Increased ventilation for acceptable indoor air quality (IAQ), besides increasing energy use, may result in unacceptably high indoor humidity, particularly in humid climates and/or applications requiring high ventilation rates. This report analyzes how increased ventilation affects the dehumidification capabilities of air conditioning systems in three applications -- offices, retail...

2002-02-21T23:59:59.000Z

303

Quality management at Argonne National Laboratory: Status, accomplishments, and lessons learned  

SciTech Connect

In April 1992, Argonne National Laboratory (ANL) launched the implementation of quality management (QM) as an initiative of the Laboratory Director. The goal of the program is to seek ways of improving Laboratory performance and effectiveness by drawing from the realm of experiences in the global total quality management movement. The Argonne QM initiative began with fact finding and formulating a strategy for implementation; the emphasis is that the underlying principles of QM should be an integral part of how the Laboratory is managed and operated. A primary theme that has guided the Argonne QM initiative is to consider only those practices that offer the potential for real improvement, make sense, fit the culture, and would be credible to the broad population. In October 1993, the Laboratory began to pilot a targeted set of QM activities selected to produce outcomes important to the Laboratory--strengthening the customer focus, improving work processes, enhancing employee involvement and satisfaction, and institutionalizing QM. This report describes the results of the just-concluded QM development and demonstration phase in terms of detailed strategies, accomplishments, and lessons learned. These results are offered as evidence to support the conclusion that the Argonne QM initiative has achieved value-added results and credibility and is well positioned to support future deployment across the entire Laboratory as an integrated management initiative. Recommendations for follow-on actions to implement future deployment are provided separately.

NONE

1995-06-01T23:59:59.000Z

304

Federal Energy Management Program: EISA Compliance Tracking System Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

EISA Compliance EISA Compliance Tracking System Reports and Data to someone by E-mail Share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Facebook Tweet about Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Twitter Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Google Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Delicious Rank Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Digg Find More places to share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules

305

Trends in Energy Management Technologies - Part 5: Effectiveness of Energy Management Systems: What the Experts Say and Case Studies Reveal  

E-Print Network (OSTI)

with computerized maintenance management systems (CMMS)).maintenance of mechanical and electrical systems, and managementengineers and maintenance staff. Firm management are

Webster, Tom

2005-01-01T23:59:59.000Z

306

Integrated Building Management System (IBMS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Management System Building Management System (IBMS) Integrated Building Management System (IBMS) The U.S. Department of Energy (DOE) is currently conducting research into an integrated building management system (IBMS). Project Description This project seeks to develop an open integration framework that allows multivendor systems to interoperate seamlessly using internet protocols. The applicant will create an integrated control platform for implementing new integrated control strategies and to enable additional enterprise control applications, such as demand response. The project team seeks to develop several strategies that take advantage of the sensors and functionality of heating, ventilation, and air conditioning (HVAC); security; and information and communication technologies (ICT) subsystems;

307

LED lamp power management system and method  

DOE Patents (OSTI)

An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

2013-03-19T23:59:59.000Z

308

MANAGEMENT ASSESSMENT AN INTEGRATED ENVIRONMENT SAFETY & HEALTH MANAGEMENT SYSTEM (ISMS) CORE FUNCTION FOR FEEDBACK & CONTINUOUS IMPROVEMENT  

Science Conference Proceedings (OSTI)

Management assessment is required of US Department of Energy contractors by 10 CFR 830.122 and DOE Order 414.1. The management assessment process is a rigorous, preplanned, forward-looking review. It is required to be performed by owners of the processes that are being assessed. Written from the perspective of the Assessment Program Director and an Assessment Specialist, this paper describes the evolution of the process used by CH2MHILL to implement its management assessment program over the past two years including: roles, responsibilities, and details about our program improvement project designed to produce a clear picture of management processes and to identify opportunities for improvement. The management assessment program is essential to successful implementation, maintenance, and improvement of the CH2MHILL Integrated Environment, Safety, and Health Management System (ISMS). The management assessment program implements, in part, ISMS Core Function No. 5. ''Feedback and Continuous Improvement''. Organizations use the management assessment process to assess ISMS implementation and effectiveness. Management assessments evaluate the total picture of how well management processes are meeting organizational objectives and the customer's requirements and expectations. The emphasis is on management issues affecting performance, systems, and processes such as: strategic planning, qualification, training, staffing, organizational interfaces, communication, cost and schedule control and mission objectives. Management assessments should identify any weaknesses in the management aspects of performance and make process improvements. All managers from first line supervisors to the president and general manager are involved in the management assessment process. More senior managers, in conducting their assessment, will use data from lower levels of management. This approach will facilitate the objective of having managers closer to the work under review focusing on more compliance- and process-oriented aspects of work performance, while senior managers will concentrate on more strategic issues, having more access to information generated from assessments by their subordinates.

VON WEBER, M.

2005-07-26T23:59:59.000Z

309

Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Firre Protection System Design  

NLE Websites -- All DOE Office Websites (Extended Search)

the the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1

310

Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Firre Protection System Design  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1

311

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering  

E-Print Network (OSTI)

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering The IMS System Maintenance Review offering is a special service offering from the IMS laboratory Technical Specialist group. Complex IMS systems require periodic maintenance, coupled with a specific testing process

312

V-125: Cisco Connected Grid Network Management System Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Cisco Connected Grid Network Management System Multiple 5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am Addthis PROBLEM: Cisco Connected Grid Network Management System Multiple Vulnerabilities PLATFORM: Cisco Connected Grid Network Management System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco Security Notice CVE-2013-1171 Secunia Advisory SA52834 SecurityTracker Alert ID: 1028374 SecurityTracker Alert ID: 1028373 CVE-2013-1163 CVE-2013-1171 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Certain input related to the element list component is not properly sanitised before being returned to the user. This can be exploited to

313

V-125: Cisco Connected Grid Network Management System Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Cisco Connected Grid Network Management System Multiple 5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am Addthis PROBLEM: Cisco Connected Grid Network Management System Multiple Vulnerabilities PLATFORM: Cisco Connected Grid Network Management System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco Security Notice CVE-2013-1171 Secunia Advisory SA52834 SecurityTracker Alert ID: 1028374 SecurityTracker Alert ID: 1028373 CVE-2013-1163 CVE-2013-1171 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Certain input related to the element list component is not properly sanitised before being returned to the user. This can be exploited to

314

Building-Level Energy Management Systems (BLEMS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emerging Technologies » Building-Level Energy Management Systems Emerging Technologies » Building-Level Energy Management Systems (BLEMS) Building-Level Energy Management Systems (BLEMS) The U.S. Department of Energy (DOE) is currently conducting research into building-level energy management systems (BLEMS). Project Description BLEMS provide an integrated plug-and-play capability for legacy energy management systems (EMSs), such as those based on X-10, Zigbee, 802.15, and newly developed EMS for buildings of any size. Project Partners Research is being undertaken by DOE, the University of Southern California, General Electric (GE) Global Research, and GE Consumer & Industrial Division. Project Goals The goal of this project is to develop practical solutions that bring together ad-hoc legacy energy management systems under a single, unified

315

V-132: IBM Tivoli System Automation Application Manager Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

316

Practical Ocean Energy Management Systems Inc POEMS | Open Energy  

Open Energy Info (EERE)

Ocean Energy Management Systems Inc POEMS Ocean Energy Management Systems Inc POEMS Jump to: navigation, search Name Practical Ocean Energy Management Systems Inc (POEMS) Place San Diego, California Zip 92138 Sector Ocean, Renewable Energy Product POEMS was formed to involve the public in providing support for the development of ocean energy as a viable component of the renewable energy market. References Practical Ocean Energy Management Systems Inc (POEMS)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Practical Ocean Energy Management Systems Inc (POEMS) is a company located in San Diego, California . References ↑ "Practical Ocean Energy Management Systems Inc (POEMS)" Retrieved from

317

V-132: IBM Tivoli System Automation Application Manager Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

318

Power Quality Issues in a Hybrid Power System: Preprint  

DOE Green Energy (OSTI)

We analyzed a power system network, which consisted of two types of power generation: wind turbine generation and diesel generation. The power quality and the interaction of diesel generation, the wind turbine, and the local load were the subjects of investigation. From an energy-production point of view, it is desirable to have as much wind energy production as possible in order to save fuel consumption of the diesel engines and to reduce the level of pollution. From the customer point of view, it is desirable to have good power quality at the receiving end. The purpose of this paper is to show the impact of wind power plant in the entire system. Also, we discuss how the startup of the wind turbine and the transient condition during load changes affects the voltage and frequency in the system.

Muljadi, E.; McKenna, H. E.

2001-09-01T23:59:59.000Z

319

Efficient thermal management for multiprocessor systems  

E-Print Network (OSTI)

2.2.4 Thermal Modeling . . . . . . . .63 Table 4.3: Thermal Hot Spots . . . . . . . . . . . . . .Performance-Efficient Thermal Management . . . . . . . . . .

Co?kun, Ay?e K?v?lc?m

2009-01-01T23:59:59.000Z

320

Battery Thermal Management System Design Modeling  

SciTech Connect

Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

Pesaran, A.; Kim, G. H.

2006-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Agricultural Waste Management System Component Design  

E-Print Network (OSTI)

Management Field Handbook 10­1(210-vi-AWMFH, rev. 1, July 1996) Chapter 10 Agricultural Waste Management..............................................................................................10­67 (b) Gravity flow pipes Waste Management Field Handbook 10­2 (210-vi-AWMFH, rev. 1, July 1996) 651.1006 Utilization 10­71 (a

Mukhtar, Saqib

322

Evaluating Ocean Management Systems to Facilitate the Development of Ecosystem-Based Management  

E-Print Network (OSTI)

Report R/OPC-ENV-02 Evaluating Ocean Management Systems toinformation about how the oceans are governed can be gleanedthe understanding of existing ocean governance to assist

Young, Oran R

2009-01-01T23:59:59.000Z

323

Spent Nuclear Fuel project systems engineering management plan  

SciTech Connect

The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

Womack, J.C.

1995-10-03T23:59:59.000Z

324

Burner Management System Maintenance Guide for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

Burner Management System Maintenance Guide for Fossil Power Plant Personnel provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs associated with the burner management system.

2008-03-25T23:59:59.000Z

325

A frame knowledge system for managing financial decision knowledge  

Science Conference Proceedings (OSTI)

Managing decision knowledge or expertise from domain experts is one of the most exciting challenges in today's knowledge management field. The nature of decision knowledge in determining a firm's financial health is context-dependent, intangible, and ... Keywords: Financial decision management, Frame knowledge representation, Jess, Knowledge acquisition, Knowledge-based system

Weissor Shiue; Sheng-Tun Li; Kuan-Ju Chen

2008-10-01T23:59:59.000Z

326

Total Thermal Management System for Hybrid and Full Electric Vehicles  

Total Thermal Management System for Hybrid and Full Electric Vehicles Note: The technology described above is an early stage opportunity. Licensing rights to this ...

327

Nuclear Materials Management & Safeguards System CHANGE OF PROJECT...  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number:...

328

Thermal Management of Onboard Cryogenic Hydrogen Storage Systems...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan: (A) System Weight and Volume (C) Efficiency (E) ChargingDischarging Rates (J) Thermal Management Technical Targets In this project, studies are being conducted to develop...

329

Supplement Analysis for the Transmission System Vegetation Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-21) Joe Johnson - TFSKalispell - Natural Resource...

330

Evaluation of Authorization Basis Management Systems and Processes...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

plant priorities contributes to deferral of needed plant infrastructure upgrades, such as roof replacements and fire protection system improvements. Pantex line managers also...

331

IMPACT Loss Prevention Software - Syntex Management Systems, Inc.  

U.S. Energy Information Administration (EIA)

Developed by Houston's Syntex Management Systems, IMPACT Loss Prevention Software is quickly becoming a standard in the oil and gas industry

332

DOE O 151.1C, Comprehensive Emergency Management System  

Directives, Delegations, and Requirements

The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Cancels DOE O 151.1B.

2005-11-02T23:59:59.000Z

333

Proactive energy management for next-generation building systems...  

NLE Websites -- All DOE Office Websites (Extended Search)

Proactive energy management for next-generation building systems Argonne is engaged in work to develop sensors and controls to improve the energy efficiency of buildings. As part...

334

Intelligent Bioreactor Management Information System (IBM-IS...  

NLE Websites -- All DOE Office Websites (Extended Search)

a network of automated sensors and control points to manage and control bioreactor landfill gas extraction and liquid addition. This system will help control and optimize...

335

Review of Electrical System Configuration Management and Design...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project July 2011 Office of...

336

MANAGING MODERNIZATION OF NUCLEAR POWER PLANT INSTRUMENTATION AND CONTROL SYSTEMS  

E-Print Network (OSTI)

Managing modernization of nuclear power plant instrumentation and control systems February 2004The originating Section of this publication in the IAEA was:

unknown authors

2003-01-01T23:59:59.000Z

337

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

338

Automation of a Wireless Cotton Module Tracking System for Cotton Fiber Quality Mapping  

E-Print Network (OSTI)

The ability to map the profit made across a cotton field would enable producers to see in detail where money is being made or lost on their farms. This ability, which requires sitespecific knowledge of yield, fiber quality, and input costs would further enable them to implement precise field management practices to ensure that they receive the highest return possible on each portion of a field and do not waste materials and other inputs throughout the field. Investigators at Texas A&M previously developed a wireless-GPS system that tracks where a module of cotton comes from within a field. This system is a necessary component in mapping fiber quality, which is a major determiner of price and thus profit. Three drawbacks to the previous wireless-GPS system are that (1) a person must manually trigger the system to send wireless communications when a field machine dumps its load of cotton, (2) multiple field machines of the same type (e.g., two cotton pickers) cannot be used simultaneously on the same system within the same field, and (3) no software is available to automatically produce fiber-quality maps after the data are downloaded from the gin. The first two drawbacks, the need for an automatic communication-triggering system and the needed capability for multiple field machines of the same type are the problems addressed in this work. To solve the first problem, a sensing and control system was added to a harvester to automatically indicate when the machine is dumping a basket load of cotton so that wireless messages can be automatically sent from the harvester to subsequent field machines without human intervention. This automated communication-triggering system was incorporated into the existing wireless- GPS system, rigorously field tested, and ultimately proven to operate as designed. Linking data collected with this system together with classing information will enable producers to create fiber-quality maps, and linking fiber-quality maps with yield and input-cost maps will enable them to create profit maps. Additionally, a radio-frequency identification (RFID) system was integrated with the wireless-GPS system to allow for multiple field machines of the same type. The RFID system was also rigorously field tested and proven to operate as designed. Finally, the entire system was field tested as a whole and operated according to design. Thus, the wireless-GPS module tracking system now operates without human intervention and works with multiple field machines of each type, two additional capabilities required for practical use in large farming operations.

Sjolander, Andrew J.

2009-08-01T23:59:59.000Z

339

Management of Control System Information SecurityI: Control System Patch Management  

SciTech Connect

The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

2011-09-01T23:59:59.000Z

340

Modeling System Development for the Evaluation of Dynamic Air Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Modeling System Development for the Evaluation of Dynamic Air Quality Modeling System Development for the Evaluation of Dynamic Air Quality Impacts of DER Speaker(s): Robert Van Buskirk Date: January 30, 2003 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Kristina LaCommare A critical challenge for the atmospheric sciences is to understand the anthropogenic impacts on atmospheric chemistry over spatial scales ranging from the urban to the regional, and ultimately to the global, and over corresponding time scales ranging from minutes to weeks and ultimately annual trends. A similar challenge for energy policymakers is to integrate an understanding of impact dynamics into the economic dynamics of energy supply and demand. The challenges of dynamic analysis of emissions impacts from the energy sector have substantially increased with a new

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Construction of a Systemic Quality Model for Evaluating a Software Product  

Science Conference Proceedings (OSTI)

Quality is currently considered one of the main assets with which a firm can enhance its competitive global position. This is one reason why quality has become essential for ensuring that a company's products and processes meet customers' needs. A recent ... Keywords: Dromey's model, ISO 9126, metrics, quality model, software product quality, systemic quality

Maryoly Ortega; María Pérez; Teresita Rojas

2003-07-01T23:59:59.000Z

342

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-03T23:59:59.000Z

343

Office of Information Systems Management (OISM)  

Science Conference Proceedings (OSTI)

... of Commerce (DOC) Office of the CIOComputer Security Resource Center (CSRC)Federal CIO CouncilOffice of Management and Budget (OMB). ...

2013-01-15T23:59:59.000Z

344

Temperature and cooling management in computing systems  

E-Print Network (OSTI)

78 5.2 Combined Energy, Thermal and CoolingOne reason for thermal and energy variations betweenWe propose a combined energy, thermal and cooling management

Ayoub, Raid

2011-01-01T23:59:59.000Z

345

NETL: Produced Water Management Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Produced Water Management Technology Descriptions Fact Sheet - Underground Injection for Disposal PWMIS Home Intro to Produced Water Technology Descriptions Basic Separation...

346

Building Energy Monitoring System: Making Energy Manageable  

NLE Websites -- All DOE Office Websites (Extended Search)

manageable. In most organizations, this means bringing that expense into the budgetforecastvariance cycle at the department and individual level. While energy costs are the...

347

Recommended Practice for Patch Management of Control Systems  

Science Conference Proceedings (OSTI)

A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

Steven Tom; Dale Christiansen; Dan Berrett

2008-12-01T23:59:59.000Z

348

A Management and Selection System for R&D Projects, Volume II - Project Management System and Project Data System  

DOE Green Energy (OSTI)

This report in three volumes describes an R&D project management and selection system developed for the Utilization Technology Branch of the Division of Geothermal Energy, Department of Energy. The proposed project management system (PMS) consists of a project data system (PDS) and a project selection procedure (PSP). The project data system consists of a series of project data forms and project status logs, and descriptions of information pathways. The PDS emphasizes timely monitoring of the technical and financial progress of projects, maintenance of the history of the project and rapid access to project information to facilitate responsive reporting to DGE and DOE upper management. The project selection procedure emphasizes an R&D product-oriented approach to benefit/cost analysis of individual projects. The report includes: (a) a description of the system, and recommendations for its implementation, (b) the PDS forms and an explanation of their use, (c) a glossary of terms for use on the forms, (d) a description of the benefit/cost approach, (e) a data base for estimating R&D benefits, and (f) examples of test applications of the system to nine current DGE projects. This volume discusses the proposed Project Data System in detail. It describes information needs and flow paths, and an information collection and storage system. Appendices contain the data forms for the system, and a glossary of terms and standard phrases for use on the forms.

Dhillon, Harpal S.; Entingh, Daniel J.

1978-05-01T23:59:59.000Z

349

Managing Complexity: Disease Control as a Complex Adaptive System  

Science Conference Proceedings (OSTI)

Trends in computer and communications technologies are enabling increased globalization and integration of enterprises, and corresponding increases of enterprise complexity.ï¾ ï¾ This article addresses management of this complexity using a complex adaptive ... Keywords: complex adaptive systems, disease control, strategic management, complexity, system models

William B. Rouse

2000-04-01T23:59:59.000Z

350

Ontology enabled decision support system for emergency management at airports  

Science Conference Proceedings (OSTI)

This paper presents the first prototype of the EMILI-SITE system that will provide an advanced simulation and training capabilities for emergency management in critical infrastructures like airports, railway/metro systems, and power grids. In addition, ... Keywords: SCADA, airport, complex event processing, emergency management, event-condition-action rules, ontologies, simulation, training

Vuk Mijovi?; Nikola Tomaševi?; Valentina Janev; Mladen Stanojevi?; Sanja Vraneš

2011-09-01T23:59:59.000Z

351

Development of mobile workforce management system for electricity supply industries  

Science Conference Proceedings (OSTI)

This research paper presents the features of a proposed Mobile Workforce Management System (MWMS) that will be used for the Electricity Supply Industries (ESI). The paper wraps up the types of related works that has been executed; the study on problems ... Keywords: electricity supply industry, mobile workforce management system

Faridah Hani Mohamed Salleh; Zaihisma Che Cob; Mohana Shanmugam; Siti Salbiah Mohamed Shariff

2009-12-01T23:59:59.000Z

352

Sandia National Laboratories, California Environmental Management System program manual.  

SciTech Connect

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

Larsen, Barbara L.

2013-04-01T23:59:59.000Z

353

Event-Driven Power Management of Portable Systems  

E-Print Network (OSTI)

in modeling real- life systems where transition times between power states are not geometrically distributed. State transitions are controlled by commands issued by a power manager (PM) that observes the workload of the system and decides the when and how to force power state transitions. We call power management policy

Simunic, Tajana

354

Environmental impact on municipal solid waste management system in Chaiyaphum  

Science Conference Proceedings (OSTI)

Continually increasing amount of municipal solid waste (MSW) and the limited capacity of the existing waste management system are serious problems that Chaiyaphum municipality must deal with. The optimal waste management system should be adopted. Explicit ... Keywords: decision making, environmental evaluation, life cycle assessment, municipal solid waste

S. Piyaphant; K. Prayong

2011-10-01T23:59:59.000Z

355

Overhead reduction in a distributed path management system  

Science Conference Proceedings (OSTI)

CEAS (cross entropy ant system) is a distributed, robust and adaptive swarm intelligence system for path management in communication networks. This paper focuses on strategies for handling the overhead in terms of processing cycles, memory storage, and ... Keywords: Cross entropy, Path management, Swarm intelligence

Poul E. Heegaard; Otto J. Wittner

2010-04-01T23:59:59.000Z

356

Content Change Management: Problems for Web Systems  

Science Conference Proceedings (OSTI)

Behind the facade of a web site, lies the task of managing its infrastructure and content. This is driving the Internet economy into a Web crisis. The software community has experienced a similar crisis and knows that configuration management (CM) is ...

Susan A. Dart

1999-09-01T23:59:59.000Z

358

System theoretic approach for determining causal factors of quality loss in complex system design  

E-Print Network (OSTI)

Identifying the factors that could lead to the loss of quality is difficult for large, complex systems. Traditional design methods such as Failure Modes and Effects Analysis (FMEA), Fault Tree Analysis (FTA), and Robust ...

Goerges, Stephanie L

2013-01-01T23:59:59.000Z

359

Development of expert system modeling based decision support system for swine manure management  

Science Conference Proceedings (OSTI)

Animal waste has always been considered as a resource for agricultural input as biofertilizer. However, the management is becoming more stringent due to environmental regulations. Livestock producers are faced with different manure management options ... Keywords: Decision criteria, Decision support system (DSS), Expert system, Manure management, Systems engineering approach

S. Karmakar; M. NKetia; C. Laguë; J. Agnew

2010-04-01T23:59:59.000Z

360

INFORMATION ON THE SYSTEM FOR AWARD MANAGEMENT (SAM)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ON THE SYSTEM FOR AWARD MANAGEMENT (SAM) ON THE SYSTEM FOR AWARD MANAGEMENT (SAM) Eight federal procurement systems and the Catalog of Federal Domestic Assistance will be combined into one new system, the System for Award Management (SAM). The overarching benefits of SAM include streamlined and integrated processes, elimination of data redundancies, and reduced costs while providing improved capability. Capability of the individual systems is expected to be available to users via SAM in stages, starting with Entity Management (Central Contractor Registration (CCR), Federal Agency Regulation (FedReg), Online Representatives and Certification Application (ORCA) and the Excluded Parties List System (EPLS)) beginning May 29, 2012. After implementation of SAM, when users go to the CCR/FedReg, ORCA, or EPLS websites, they'll be

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Trends in Energy Management Technology - Part 3: State of Practice of Energy Management, Control, and Information Systems  

E-Print Network (OSTI)

November 2000. Trends in Energy Management TechnologyInc. Siemens Building Technologies Inc. Teletrol Systems,Trends in Energy Management Technology FEMP/NTDP Technical

Yee, Gaymond; Webster, Tom

2004-01-01T23:59:59.000Z

362

Management processes in U.S. air traffic management modernization : a study of global navigation satellite system development  

E-Print Network (OSTI)

This thesis investigates organization and management issues associated with the Federal Aviation Administration's (FAA) efforts to modernize the nation's Air Traffic Management (ATM) system. Focus is placed specifically ...

Sandvig, John H.

1994-01-01T23:59:59.000Z

363

ASGrid: autonomic management of hybrid sensor grid systems and applications  

Science Conference Proceedings (OSTI)

In this paper, we propose an autonomic management framework (ASGrid) to address the requirements of emerging large-scale applications in hybrid grid and sensor network systems. To the best of our knowledge, we are the first who proposed the ... Keywords: P2P, WSNs, autonomic computing, autonomic management, autonomic sensor grid, data aggregation, grid computing, hybrid distributed systems, key management, network security, peer computing, peer-to-, self-configuration, self-optimisation, self-protection, task scheduling, trust management, wireless sensor networks

Xiaolin Li; Xinxin Liu; Han Zhao; Huanyu Zhao; Nanyan Jiang; Manish Parashar

2009-11-01T23:59:59.000Z

364

NETL: Site Environmental Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Quality Site Environmental Quality About NETL Site Environmental Quality - Certified to ISO 14001:2004 Questions about NETL's Environment, Safety and Health Management System may be directed to Michael Monahan, 304-285-4408, michael.monahan@netl.doe.gov. NETL has implemented an Environment, Safety and Health (ES&H) Management System, based on DOE's Integrated Safety Management System, the International Organization for Standardization (ISO) 14000 series, and the Occupational Health and Safety Assessment (OHSAS) 18000 series. While the original scope of the ES&H Management System included the Morgantown and Pittsburgh sites, in fiscal year 2010, the Albany site was incorporated into the existing ES&H Management System. In addition, all three sites underwent ISO 14001:2004 recertification audits and Morgantown and

365

A Numerical Daily Air Quality Forecast System for The Pacific Northwest  

Science Conference Proceedings (OSTI)

A real-time photochemical air quality forecast system has been implemented for the Puget Sound region to support public awareness of air quality issues. The Air Indicator Report for Public Access and Community Tracking (AIRPACT) forecast system ...

Joseph Vaughan; Brian Lamb; Chris Frei; Rob Wilson; Clint Bowman; Cristiana Figueroa-Kaminsky; Sally Otterson; Mike Boyer; Cliff Mass; Mark Albright; Jane Koenig; Alice Collingwood; Mike Gilroy; Naydene Maykut

2004-04-01T23:59:59.000Z

366

Integrated Safety & Environmental Management System | Stanford Synchrotron  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Safety & Environmental Management System Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation of ES&H at work. The system puts the responsibility for safety on each person. Fundamental to the process are the Guiding Principles that can be viewed as "best management practices" or "how we do business", which are the policies that integrate ISMS at all levels; the Core Functions, which provide the

367

Apparatus and method for monitoring an energy management system  

SciTech Connect

This patent describes an apparatus for determining a parameter of operation of an energy management system of the type which controllably drops load form an electrical power network in response to preselected conditions; It comprises: means for periodically interrupting the operation of energy management system and restoring the load to the network; means for generating a first energy usage signal representative of energy usage on the network at a time when the energy management is not interrupted by the interrupting means; means for generating a second energy usage signal representative of energy usage on the network at a time when the interrupting means interrupts the energy management system; and means responsive to the first energy usage signal and the secondary energy usage signal for computing the parameter of operation of the energy management system.

Huddleston, P.M.; Porter, G.B. Jr.; Rooney, D.T.

1989-08-08T23:59:59.000Z

368

Review: The impact of agricultural activities on water quality: A case for collaborative catchment-scale management using integrated wireless sensor networks  

Science Conference Proceedings (OSTI)

The challenge of improving water quality is a growing global concern, typified by the European Commission Water Framework Directive and the United States Clean Water Act. The main drivers of poor water quality are economics, poor water management, agricultural ... Keywords: Agricultural activities, Catchment, Collaborative, Water quality monitoring and management, Wireless sensor networks

Huma Zia, Nick R. Harris, Geoff V. Merrett, Mark Rivers, Neil Coles

2013-08-01T23:59:59.000Z

369

Open source tool for energy saving and efficient system management  

Science Conference Proceedings (OSTI)

In order to improve power quality (PQ) techniques, efforts are made to develop smart sensors that can report near real-time data. Proprietary software and hardware on dedicated computers or servers processes these data and shows relevant information ... Keywords: arm architecture, embedded systems, energy saving optimization, power quality optimization

Consolación Gil; Pedro Sánchez; Francisco G. Montoya; Antonio L. Márquez

2011-07-01T23:59:59.000Z

370

Trends Affecting Building Control System Development: Trends in Energy Management Technology  

E-Print Network (OSTI)

technologies on energy management systems and products. Therelative to energy management systems design, specification,and Control System Energy Management System F E D E R A L E

Collins, Ted; Parker, Steven A.; Webster, Tom

2002-01-01T23:59:59.000Z

371

Best Management Practice: Distribution System Audits, Leak Detection, and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Distribution System Audits, Leak Best Management Practice: Distribution System Audits, Leak Detection, and Repair Best Management Practice: Distribution System Audits, Leak Detection, and Repair October 7, 2013 - 3:06pm Addthis A distribution system audit, leak detection, and repair programs help Federal facilities reduce water losses and make better use of limited water resources. Overview Federal facilities with large campus settings and expansive distribution systems can lose a significant amount of total water production and purchases to system leaks. Leaks in distribution systems are caused by a number of factors, including pipe corrosion, high system pressure, construction disturbances, frost damage, damaged joints, and ground shifting and settling. Regular distribution system leak detection surveys

372

Assessment of Residential Energy Management Systems for Demand Response Applications  

Science Conference Proceedings (OSTI)

This Technical Update provides a description of what a residential energy management system comprises, with a focus on demand response applications. It includes findings from a survey of residential energy management system technology vendors; system pricing and availability; an overview of technology components and features; customer load monitoring and control capabilities; utility demand response control functions; communications protocols and technologies supported; and options for demand response si...

2009-12-22T23:59:59.000Z

373

Model Uncertainty and the Management of a System of Infrastructure Facilities  

E-Print Network (OSTI)

Management of a System of Infrastructure Facilities KennethAbstract The network-level infrastructure management problemS. (1993) Optimal Infrastructure Management Decisions Under

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

374

Trends Affecting Building Control System Development: Trends in Energy Management Technology  

E-Print Network (OSTI)

vehicles. ) Computerized Maintenance Managementaided facility management and maintenance systems (CAFM/Maintenance work order generation and dispatch management;

Collins, Ted; Parker, Steven A.; Webster, Tom

2002-01-01T23:59:59.000Z

375

Criticality accident alarm system at the Fernald Environmental Management Project  

SciTech Connect

The purpose of this paper is to give a description of the Criticality Accident Alarm System (CAAS) presently installed at the Fernald Environmental Management Project (FEMP) for monitoring areas requiring criticality controls, and some of the concerns associated with the operation of this system. The system at the FEMP is known as the Radiation Detection Alarm (RDA) System.

Marble, R.C.; Brown, T.D.; Wooldridge, J.C.

1994-06-01T23:59:59.000Z

376

Use of SNMP in the Management of Electrical Energy Measuring Systems  

E-Print Network (OSTI)

The conventional measuring systems face imprecision and inefficient problems. Imprecision because measurements done by a human being can be imperfect. Inefficient because it's difficult to control a whole complex net like the electrical energy distribution only with a large group of people. The automatic measuring systems are an alternative to the conventional systems as a way to provide a better quality of service. So it's necessary an effective management on the measuring net components. Aspects like prevention of failures in devices until consumption readings are considered in the choice of a management protocol. SNMP is an efficient and simple alternative and its use in SALAME system (Electrical Energy Remote Measuring System) validates this subject. We show the facility of the information treatment like polling of the devices, control of communication errors, remote control of the devices and information to the consumers in the management station of SALAME system with the use of SNMP. In this article we accentuate the facility and importance of this subject to the remote measuring system management and its implementation in a real system.

Gustavo Wagner Diniz; Gustavo Wagner; Diniz Mendes; Hugo Raniere; Di Assunção Brasilino; Pedro Sergio Nicoletti; Luis Reyes Rosales

2003-01-01T23:59:59.000Z

377

Energy Management Systems Package for Small Commercial Buildings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EnMS (energy management EnMS (energy management systems) Package for Small Commercial Buildings Jessica Granderson Lawrence Berkeley National Laboratory JGranderson@lbl.gov 510.486.6792 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: Small commercial buildings present two challenges for implementing energy efficiency strategies 1) high transaction cost relative to total savings 2) lack of personnel time or skill available for energy management

378

OCRWM Systems Engineering Management Plan (SEMP). Revision 3  

SciTech Connect

The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.

1994-06-01T23:59:59.000Z

379

Coordination of Data Elements from the DOT Management Systems Page i COORDINATION OF DATA  

E-Print Network (OSTI)

. Intermodal Management System Page 9 e. Maintenance Management System Page 9 f. Pavement Management System In addition to the management systems from ISTEA, the Iowa DOT has begun development of a Maintenance Matrix of Common Data Elements Among Management Systems General Grouping of Data Elements Mainten. Safety

Beresnev, Igor

380

Systems and Components Development Expertise [Nuclear Waste Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Systems and Components Systems and Components Development Expertise Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology Systems and Components Development Expertise Bookmark and Share Electrorefiner The electrorefiner: an apparatus used for electrometallurgical treatment of spent nuclear fuel to facilitate storage and ultimate disposal. Click on

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Application of an Energy Management System to a Distribution Center  

E-Print Network (OSTI)

Capital outlays for energy management must be economically attractive to warrant an expenditure. An energy management system has one of the most economic returns for an investment decision, if applied effectively. The Quaker Oats Company installed such a System in its Dallas Distribution Center. In one year the electric bills were reduced by a total of $17,668.91. Electric consumption (KWH) was reduced by thirty-one percent, electrical demand (KW) was reduced by thirty-six percent while plant operations expanded. This paper discusses the control strategies employed by the energy management system and provided the resultant savings that was obtained from the first year of operation.

Warnick, T.

1984-01-01T23:59:59.000Z

382

Harrison Radiator Division's Energy Management, Reporting and Accounting System  

E-Print Network (OSTI)

Energy management is essential for obtaining the lowest possible product manufacturing cost. Many systems have been created over the years to manage the energy used in manufacturing. However, for a variety of reasons, most of them never reached their full potential. Harrison Radiator first installed an energy management system in 1973. Energy consumption was reduced 42% from 1973 through 1984. However, the gains the last couple of years have been small. In 1984, important changes were made to the system and energy reporting was added, resulting in 1985 energy consumption reduction of about 16%. This paper will briefly describe Harrison's successful energy management, reporting and accounting system. Examples of reports, available data, information flow and benefits will be covered, with special mention of all factors that lead to our system's success.

Goubeaux, R. J.

1986-06-01T23:59:59.000Z

383

Power Quality Evaluation of 480-V, 2-MVA UPS Systems  

DOE Green Energy (OSTI)

A mobile 480-V, 2-MVA UPS System utilizing battery energy storage was installed at S and C Electric Company's Polymer Products Fabrication Building in Chicago, Illinois in May 1999 to provide uninterrupted power to the building for up to 15 seconds in the event of a voltage sag or momentary interruption in the local utility supply. Similar units can be applied at medium voltage through the application of a step-up transformer to provide momentary power disturbance ride through of up to 30 seconds for loads up to 15 MVA at system voltages ranging from 4.16 kV to 34.5 kV. A power quality evaluation of the installation was performed over a six-month period from July 1999 to early January 2000. This paper describes the details and results of this power quality evaluation, which involved two phases. Phase I involved the collection and review of power disturbance data and the effects on process equipment, while Phase II involved power quality monitoring of utility source and building load voltages and currents over a period of six months. Review of power disturbance data and equipment power-disturbance ride-through characteristics during Phase I of the project indicated that the polymer fabrication process in the building is affected by the tripping of motors driving hydraulic pumps for the thermal set molding machines. The tripping of these motors may have resulted in direct production losses in 1998 of approximately $468,000. The monitoring conducted during Phase II of the project showed that the PureWave UPS operated as intended during 12 utility voltage sag events to protect the building's load against momentary power disturbances. In addition, the unit operated successfully during many staged interruptions involving opening of a source-side circuit breaker.

CAMM,E.H.; COREY,GARTH P.; ROBERTS,B.

2000-06-21T23:59:59.000Z

384

Integrated Requirements Management System Operations and Maintenance Plan  

Science Conference Proceedings (OSTI)

This document provides a plan for the operations and maintenance of the Integrated Requirements Management Systems (IRMS) database. This document describes the roles and responsibilities for the users of the IRMS. Planning is provided for the configuration management of the DOORS software, hardware and data set. Training consideration for the various categories of users is provided.

ACREE, C.D.

2001-03-26T23:59:59.000Z

385

A Smart Energy System: Distributed Resource Management, Control and Optimization  

E-Print Network (OSTI)

A Smart Energy System: Distributed Resource Management, Control and Optimization Yong Ding, Student of distributed energy resource and consumption management, which proposes to design a networked and embedded and energy data can be acquired and processed in a distributed manner in real time. In order to improve

Beigl, Michael

386

Ursa: Scalable Load and Power Management in Cloud Storage Systems  

Science Conference Proceedings (OSTI)

Enterprise and cloud data centers are comprised of tens of thousands of servers providing petabytes of storage to a large number of users and applications. At such a scale, these storage systems face two key challenges: (1) hot-spots due to the dynamic ... Keywords: Load management, linear programming, optimization, power management, storage

Gae-Won You; Seung-Won Hwang; Navendu Jain

2013-03-01T23:59:59.000Z

387

User Participation, Management Support and System Types  

Science Conference Proceedings (OSTI)

This paper explores user participation in the systems development process and examines this variable in relation to the type of system under development. Prior user participation research has not shown conclusive support for its impact on system success. ...

Edward J. Garrity

1994-07-01T23:59:59.000Z

388

From Design to Production Control Through the Integration of Engineering Data Management and Workflow Management Systems  

E-Print Network (OSTI)

At a time when many companies are under pressure to reduce "times-to-market" the management of product information from the early stages of design through assembly to manufacture and production has become increasingly important. Similarly in the construction of high energy physics devices the collection of ( often evolving) engineering data is central to the subsequent physics analysis. Traditionally in industry design engineers have employed Engineering Data Management Systems ( also called Product Data Management Systems) to coordinate and control access to documented versions of product designs. However, these systems provide control only at the collaborative design level and are seldom used beyond design. Workflow management systems, on the other hand, are employed in industry to coordinate and support the more complex and repeatable work processes of the production environment. Commer cial workflow products cannot support the highly dynamic activities found both in the design stages of product developmen...

Le Goff, J M; Bityukov, S; Estrella, F; Kovács, Z; Le Flour, T; Lieunard, S; McClatchey, R; Murray, S; Organtini, G; Vialle, J P; Bazan, A; Chevenier, G

1997-01-01T23:59:59.000Z

389

Mobile Traffic Management System Test Deployment  

E-Print Network (OSTI)

generator and additional solar power generation and storageMRM’s two independent solar power systems were integratedmeter operation. MRM Solar Power System The MRM had been

Gerfen, Jeffrey Brian

2005-01-01T23:59:59.000Z

390

Original paper: Development of an integrated Cropland and Soil Data Management system for cropping system applications  

Science Conference Proceedings (OSTI)

Most cropping system models and decision support tools are structured for site-specific (i.e. field- or point-based) simulation and analysis. As the need grows for analyses on crop production and management at local, county, state, national, and even ... Keywords: Cropland Data Layer, Cropping system, Database management system, Geographic Information System (GIS), Map service, SSURGO, Soil data

Yubin Yang; Lloyd Ted Wilson; Jing Wang; Xiaobao Li

2011-03-01T23:59:59.000Z

391

Proceedings for air quality management programs: A workshop on lessons learned  

SciTech Connect

The coordinators of this project at Los Alamos National Laboratory and the Instituto Mexicano del Petroleo proposed a workshop to bring together an international group of experts to present both the lessons of history and the current practices in air quality management around the world. The workshop would also serve as a forum for presenting the accomplishments and plans of this project and for receiving comments from the assembled group. The workshop was favored with an outstanding set of speakers who represented a broad spectrum of experience. Their papers are presented in this volume. The total attendance was forty-four (see List of Participants) with representation from numerous interested Mexican institutions. Individual reports are processed separately for the database.

Streit, G.E. [comp.

1993-06-01T23:59:59.000Z

392

Earned Value Management System (EVMS) Surveillance Standard Operating Procedure  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System (EVMS) System (EVMS) Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset

393

Service and Network Management Interworking in Future Wireless Systems  

Science Conference Proceedings (OSTI)

The need for seamless communications in future wireless networks imposes the development of distributed management systems, in which we can distinguish between different business entities, the Service and Network Providers. Such a highly dynamic environment ...

V. Tountopoulos; Vera Stavroulaki; Panagiotis Demestichas; Nikolas Mitrou; Michael E. Theologou

2002-05-01T23:59:59.000Z

394

Uncertainty management in a distributed knowledge based system  

Science Conference Proceedings (OSTI)

In many situations, a knowledge source may not give definite hypothesis; it can only express its belief and disbelief in multiple hypotheses, We present a scheme of uncertainty management in such a system. Disbelief is given a considerable importance ...

Naseem A. Khan; Ramesh Jain

1985-08-01T23:59:59.000Z

395

Residential Energy Management system for optimization of on-site...  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Energy Management system for optimization of on-site generation with HVAC Speaker(s): Ram Narayanamurthy Date: October 29, 2009 - 12:00pm Location: 90-3122 As the...

396

Energy Management Systems Package for Small Commercial Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

EnMS (energy management systems) Package for Small Commercial Buildings Jessica Granderson Lawrence Berkeley National Laboratory JGranderson@lbl.gov 510.486.6792 April 4, 2013 2 |...

397

Supporting match joins in relational database management systems  

Science Conference Proceedings (OSTI)

As more and more diverse applications seek to use database management systems (DBMS) as their primary storage, the question frequently arises as to whether we can exploit the query capabilities of the DBMS to support these applications. This dissertation ...

Ameet M. Kini / Jeffrey F. Naughton

2007-01-01T23:59:59.000Z

398

Buildings and corporate strategy : towards a management system model  

E-Print Network (OSTI)

This thesis focuses on buildings as a subject of attention and inquiry in a corporate setting. It attempts to draw implications for the design of a management system to deal with the special nature of buildings as a resource. ...

Brana, Rodrigo

1985-01-01T23:59:59.000Z

399

LKMS: a legal knowledge management system exploiting semantic web technologies  

Science Conference Proceedings (OSTI)

Semantic Web, using formal languages to represent document content and providing facilities for aggregating information spread around, can improve the functionalities provided nowadays by KM tools. This paper describes a Knowledge Management system, ...

Luca Gilardoni; Chistian Biasuzzi; Massimo Ferraro; Roberto Fonti; Piercarlo Slavazza

2005-11-01T23:59:59.000Z

400

V-132: IBM Tivoli System Automation Application Manager Multiple...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which...

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

WRAP module 1 data management system software test report  

SciTech Connect

This document summarizes the test result information for the Data Management System (DMS). Appendix A contains test result information for all Functional Test cases and Appendix B contains the results for all the Performance Test cases.

Weidert, J.R.

1997-07-25T23:59:59.000Z

402

Sensor data driven proactive management of infrastructure systems  

Science Conference Proceedings (OSTI)

In a paper presented at the ASCE International Conference on Computing in Civil Engineering in Cancun, Mexico, a vision was laid out for sensor data-driven, proactive management of infrastructure systems in which information and communication technology ...

James H. Garrett; Burcu Akinci; Scott Matthews; Chris Gordon; Hongjun Wang; Vipul Singhvi

2006-06-01T23:59:59.000Z

403

Demand side management in district heating systems  

Science Conference Proceedings (OSTI)

This paper describes a multiagent system that has made the voyage from research project to commercialised product. The purpose for the multiagent system is to dynamically control a system so that the load of the system is below certain threshold values ... Keywords: agent-based deployed applications

Fredrik Wernstedt; Paul Davidsson; Christian Johansson

2007-05-01T23:59:59.000Z

404

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z

405

Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program  

SciTech Connect

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

Not Available

1992-08-04T23:59:59.000Z

406

Office of Information Technology University of Minnesota 1 Enterprise Document Management System  

E-Print Network (OSTI)

. Scheduled Maintenance Enterprise Document Management Services (EDMS) performs daily system maintenanceOffice of Information Technology ­ University of Minnesota 1 Enterprise Document Management System The intent of this document is to describe Enterprise Document Management System (EDMS) services provided

Amin, S. Massoud

407

Flight Plan Specification and Management for Unmanned Aircraft Systems  

Science Conference Proceedings (OSTI)

This paper presents a new concept for specifying Unmanned Aircraft Systems (UAS) flight operations that aims at improving the waypoint based approach, found in most autopilot systems, by providing higher level fligh plan specification primitives. The ... Keywords: Flight plan management, Flight plan specification, Unmanned aircraft systems (UAS)

Eduard Santamaria; Enric Pastor; Cristina Barrado; Xavier Prats; Pablo Royo; Marc Perez

2012-07-01T23:59:59.000Z

408

Network Security Management for Transmission Systems  

Science Conference Proceedings (OSTI)

The electric power grid is increasingly dependent on information technology and telecommunication infrastructures.   While great benefits will result from this influx of technology, a holistic and granular awareness of all elements of the information infrastructure supporting a control subsystem will be critical to ensure long term reliability and security. The management of this information infrastructure requires connectivity and analytics to support both IT and OT assets in a unified ...

2012-12-31T23:59:59.000Z

409

Linking the Eta Model with the Community Multiscale Air Quality (CMAQ) Modeling System to Build a National Air Quality Forecasting System  

Science Conference Proceedings (OSTI)

NOAA and the U.S. Environmental Protection Agency (EPA) have developed a national air quality forecasting (AQF) system that is based on numerical models for meteorology, emissions, and chemistry. The AQF system generates gridded model forecasts ...

Tanya L. Otte; George Pouliot; Jonathan E. Pleim; Jeffrey O. Young; Kenneth L. Schere; David C. Wong; Pius C. S. Lee; Marina Tsidulko; Jeffery T. McQueen; Paula Davidson; Rohit Mathur; Hui-Ya Chuang; Geoff DiMego; Nelson L. Seaman

2005-06-01T23:59:59.000Z

410

Monitoring Buildings with Energy Management and Control Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Monitoring Buildings with Energy Management and Control Systems Monitoring and evaluation are important parts of all energy-efficiency programs. With the increasing regulatory requirements for verification of demand-side management program savings and continued development of more innovative financing mechanisms, the ability to substantiate claims of energy savings using measured data takes on added importance. Although expensive, the accurate monitoring of energy consumption and building operations is a necessary part of conservation savings analysis. Energy management and control systems (EMCSs), intended for building operations and control functions, already contain most of the same equipment usually installed for energy monitoring and can often be used for

411

Liquid low level waste management expert system  

SciTech Connect

An expert system has been developed as part of a new initiative for the Oak Ridge National Laboratory (ORNL) systems analysis program. This expert system will aid in prioritizing radioactive waste streams for treatment and disposal by evaluating the severity and treatability of the problem, as well as the final waste form. The objectives of the expert system development included: (1) collecting information on process treatment technologies for liquid low-level waste (LLLW) that can be incorporated in the knowledge base of the expert system, and (2) producing a prototype that suggests processes and disposal technologies for the ORNL LLLW system. 4 refs., 9 figs.

Ferrada, J.J.; Abraham, T.J. (Oak Ridge National Lab., TN (United States)); Jackson, J.R. (Southwest Baptist Univ., Bolivar, MO (USA))

1991-01-01T23:59:59.000Z

412

Small Water System Management Program: 100 K Area  

SciTech Connect

Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site`s 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410.

Hunacek, G.S. Jr. [Westinghouse Hanford Co., Richland, WA (United States)

1995-06-29T23:59:59.000Z

413

T-606: Sun Java System Access Manager Lets Remote Users Partially...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data T-606: Sun Java System Access Manager Lets Remote...

414

Best Management Practice: Boiler/Steam Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Boiler/Steam Systems Best Management Practice: Boiler/Steam Systems Best Management Practice: Boiler/Steam Systems October 7, 2013 - 3:17pm Addthis Boilers and steam generators are commonly used in large heating systems, institutional kitchens, or in facilities where large amounts of process steam are used. This equipment consumes varying amounts of water depending on system size, the amount of steam used, and the amount of condensate returned. Operation and Maintenance Options To maintain water efficiency in operations and maintenance, Federal agencies should: Develop and implement a routine inspection and maintenance program to check steam traps and steam lines for leaks. Repair leaks and replace faulty steam traps as soon as possible. Develop and implement a boiler tuning program to be completed a minimum of

415

A System Level Model of Possible Integration of Building Management System in SmartGrid  

Science Conference Proceedings (OSTI)

Building Management Systems (BMS) could be seen as a kind of module inside wider SmartGrid system. The incorporation of BMS must consider both technical as well as commercial issues. Hence, the efficient integration will require standards' harmonization ... Keywords: Building Management System, SmartGrid, HVAC, UML

Slobodan Lukovic; Velimir Congradac; Filip Kulic

2010-02-01T23:59:59.000Z

416

A Collaborative Model for a Sustainable Management System for Energy at Small to Medium Industrial Enterprises  

E-Print Network (OSTI)

Small to medium size industrial facilities often lack adequate resources to implement a sustainable energy management program. A strategy to overcome this constraint is to collaborate and develop partnerships between the company and other external resources. This paper describes a unique business-to-business partnership between Cook Composites and Polymers Co. (CCP) an industrial firm and Burns & McDonnell a large, multi-disciplined engineering firm that provides energy services. Over the last two years the firms have worked together towards a sustainable energy management program for CCP which incorporates the Plan-Do- Check-Act continual improvement cycle. They have collaborated on this work with government, industry and other partners and are now working towards certification under the American National Standards Institute (ANSI) Management System for Energy (MSE). ANSI/MSE 2000:2008 will be incorporated into CCP’s existing Integrated Management System which already includes components for Health, Safety, Environment and Quality. CCP considers ANSI/MSE 2000:2008 as the framework for a sustainable energy management system to provide triple bottom line economic, environmental and societal benefits. CCP continues to improve their Energy Intensity Index, eco-efficiency footprint and their global competitiveness. This systematic and collaborative approach can serve as a model for other small to medium size industrial firms.

Imel, M.; Gromacki, M.; Magoon, D.

2009-05-01T23:59:59.000Z

417

From Design to Production Control Through the Integration of Engineering Data Management and Workflow Management Systems  

E-Print Network (OSTI)

At a time when many companies are under pressure to reduce "times-to-market" the management of product information from the early stages of design through assembly to manufacture and production has become increasingly important. Similarly in the construction of high energy physics devices the collection of (often evolving) engineering data is central to the subsequent physics analysis. Traditionally in industry design engineers have employed Engineering Data Management Systems (also called Product Data Management Systems) to coordinate and control access to documented versions of product designs. However, these systems provide control only at the collaborative design level and are seldom used beyond design. Workflow management systems, on the other hand, are employed in industry to coordinate and support the more complex and repeatable work processes of the production environment. Commercial workflow products cannot support the highly dynamic activities found both in the design stages of product development and in rapidly evolving workflow definitions. The integration of Product Data Management with Workflow Management can provide support for product development from initial CAD/CAM collaborative design through to the support and optimisation of production workflow activities. This paper investigates this integration and proposes a philosophy for the support of product data throughout the full development and production lifecycle and demonstrates its usefulness in the construction of CMS detectors.

J-M. Le Goff; G. Chevenier; A. Bazan; T. Le Flour; S. Lieunard; S. Murray; J-P. Vialle; N. Baker; F. Estrella; Z. Kovacs; R. McClatchey; G. Organtini; S. Bityukov

1998-02-06T23:59:59.000Z

418

CONSTRUCTED WETLAND TREATMENT SYSTEMS FOR WATER QUALITY IMPROVEMENT  

SciTech Connect

The Savannah River National Laboratory implemented a constructed wetland treatment system (CWTS) in 2000 to treat industrial discharge and stormwater from the Laboratory area. The industrial discharge volume is 3,030 m{sup 3} per day with elevated toxicity and metals (copper, zinc and mercury). The CWTS was identified as the best treatment option based on performance, capital and continuing cost, and schedule. A key factor for this natural system approach was the long-term binding capacity of heavy metals (especially copper, lead, and zinc) in the organic matter and sediments. The design required that the wetland treat the average daily discharge volume and be able to handle 83,280 m{sup 3} of stormwater runoff in a 24 hour period. The design allowed all water flow within the system to be driven entirely by gravity. The CWTS for A-01 outfall is composed of eight one-acre wetland cells connected in pairs and planted with giant bulrush to provide continuous organic matter input to the system. The retention basin was designed to hold stormwater flow and to allow controlled discharge to the wetland. The system became operational in October of 2000 and is the first wetland treatment system permitted by South Carolina DHEC for removal of metals. Because of the exceptional performance of the A-01 CWTS, the same strategy was used to improve water quality of the H-02 outfall that receives discharge and stormwater from the Tritium Area of SRS. The primary contaminants in this outfall were also copper and zinc. The design for this second system required that the wetland treat the average discharge volume of 415 m{sup 3} per day, and be able to handle 9,690 m{sup 3} of stormwater runoff in a 24 hour period. This allowed the building of a system much smaller than the A-01 CWTS. The system became operational in July 2007. Metal removal has been excellent since water flow through the treatment systems began, and performance improved with the maturation of the vegetation during the first season of growth of each system. Sediment samples after the first and third years of operation indicated that copper was being bound in the sediments very rapidly after entering the treatment system. The design of the system encourages low redox and sulfide production in the sediments. The objective is to stabilize metals, including mercury, as sulfide compounds in the sediments. Costs for maintenance and operation of the systems are minimal, consisting primarily of ensuring that the pipes are not clogged and that water is flowing through the system. The treatment cost per thousand gallons is many times less than conventional wastewater treatment facilities. Life expectancy and function of the biological system is based on the life of the engineering aspects and not the wetland ecology.

Nelson, E.

2010-07-19T23:59:59.000Z

419

Facility-Level and System-Level Stochastic Optimization of Bridge Maintenance Policies for Markovian Management Systems  

E-Print Network (OSTI)

maintenance and inspection, led to the development of bridge management systemsmaintenance and repair decisions. Experience with infrastructure management systemsManagement Systems and Optimization Models Given available resources and a set of possible maintenance and

Robelin, Charles-Antoine

2006-01-01T23:59:59.000Z

420

Integrating Smart Distributed Energy Resources with Distribution Management Systems  

Science Conference Proceedings (OSTI)

No portion of the electric power grid has been impacted more by grid modernization (that is, the “smart grid”) than the electric distribution system. A central part of this transformation is the distribution management system (DMS), which integrates numerous remote monitoring and central control facilities with enterprise-level systems to optimize distribution system performance and accomplish a variety of business goals. At the same time, distributed energy resources are often connected ...

2012-09-21T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A comprehensive GIS-based poultry litter management system for nutrient management planning and litter transportation  

Science Conference Proceedings (OSTI)

Confined poultry (broiler) production in Alabama results in about 1.8 million tons of litter annually. Because poultry production mainly occurs in the Appalachian Plateau region of north Alabama, this region suffers from excessive land application of ... Keywords: Broiler litter, Comprehensive nutrient management plan, Decision support system, Geographic information system, Poultry litter, Transportation analysis

M. S. Kang; P. Srivastava; T. Tyson; J. P. Fulton; W. F. Owsley; K. H. Yoo

2008-12-01T23:59:59.000Z

422

Energy management/dimming system and control  

SciTech Connect

A method is described for operating a dimming system connected to a fluorescent lighting system. The fluorescent lighting system includes a ballast, fluorescent lamps and an AC source. The dimming system includes a switch connected in series with the ballast and a dimming control circuit for controlling the switch, the dimming control circuit adapted to turn on and off the switch at a high frequency during a notch period within each half-cycle of current supplied to the ballast by the AC source. It adapts to turn on the switch during the portions of each half-cycle outside of the notch period, the location and duration of the notch period being controlled by the dimming control circuit to provide a variable light output from the lighting system in response to a level command.

Alley, R.P.; Bicknell, W.H.; Routh, K.C.

1987-05-05T23:59:59.000Z

423

Manage fuel gas with an expert system  

Science Conference Proceedings (OSTI)

The Star Louisiana refinery has fuel gas header systems throughout the plant that are utilized by fuel gas producers and consumers. The refinery simultaneously exports surplus fuel gas from the export gas header, and maintains a minimum natural gas makeup rates from multiple external suppliers for fuel gas header pressure control. Successfully implementing a fuel gas expert system has facilitated communication of accurate, timely information to all unit control board operators in the refinery when any change or sub-optimal situation occurs in either of these systems. Information provided from the expert system rule knowledge base results in: proper unit operating actions taken when a flaring situation approaches, thus minimizing the negative impact of flaring on the environment and minimizing product loses to the flare; minimizing purchase of makeup natural gas used for fuel gas system pressure control; maximizing export gas capacity to prevent surplus fuel gas production from limiting refinery operation; immediately recognizing an upset in any fuel gas header system and advising the best corrective action for all affected refinery units; and minimizing voice communication required between units in an upset, since the expert system provides the communication immediately in expert advice messages.

Giacone, G.; Toben, S.; Bergeron, G. [Star Enterprise, Convent, LA (United States); Ayral, T. [Key Control Inc., Westlake Village, CA (United States)

1996-09-01T23:59:59.000Z

424

Next-Generation Distributed Power Management for Photovoltaic Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Next-Generation Distributed Power Management for Photovoltaic Systems Next-Generation Distributed Power Management for Photovoltaic Systems Speaker(s): Jason Stauth Date: July 29, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Steven Lanzisera In recent years, the balance of systems (BOS) side of photovoltaic (PV) energy has become a major focus in the effort to drive solar energy towards grid parity. The power management architecture has expanded to include a range of distributed solutions, including microinverters and 'micro' DC-DC converters to solve problems with mismatch (shading), expand networking and control, and solve critical BOS issues such as fire safety. This talk will introduce traditional and distributed approaches for PV systems, and will propose a next-generation architecture based on a new

425

Definition: Customer Energy Management Device and System | Open Energy  

Open Energy Info (EERE)

Device and System Device and System Jump to: navigation, search Dictionary.png Customer Energy Management Device and System A device that can control other energy devices such as thermostats, lighting, direct load control devices, or distributed energy resource within the customer premise. These devices may also receive information or control signals from utillities or third party energy service providers. These devices can help customers manage electricity usage automatically by utilizing information from service providers, or preferences set by the customer.[1] Related Terms energy, electricity generation, distributed energy resource References ↑ https://www.smartgrid.gov/category/technology/customer_energy_management_device_and_system [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

426

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

285: Transmission System Vegetation Management Program 285: Transmission System Vegetation Management Program EIS-0285: Transmission System Vegetation Management Program SUMMARY Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

427

G&T adds versatile load management system  

SciTech Connect

Wolverine`s load management system was designed in response to the need to reduce peak demand. The Energy Management System (EMS) prepares short term (seven day) load forecasts, based on a daily peak demand forecst, augmented by a similar day profile based on weather conditions. The software combines the similar day profile with the daily peak demand forecast to yield an hourly load forecast for an entire week. The software uses the accepted load forecast case in many application functions, including interchange scheduling, unit commitment, and transaction evaluation. In real time, the computer updates the accepted forecast hourly, based in actual changes in the weather and load. The load management program executes hourly. The program uses impact curves to calculate a load management strategy that reduces the load forecast below a desired load threshold.

Nickel, J.R.; Baker, E.D.; Holt, J.W.; Chan, M.L.

1995-04-01T23:59:59.000Z

428

System Management Ontology Description Logic Formalization of CIM  

E-Print Network (OSTI)

SMO System Management Ontology Description Logic Formalization of CIM Andrea Cal`i, Diego Calvanese Information Model (CIM) has the goal of providing a suitable approach for modeling systems and networks using the object-oriented paradigm. In this document we illustrate how to map CIM onto an expressive Description

Calvanese, Diego

429

Energy management in mobile devices with the cinder operating system  

Science Conference Proceedings (OSTI)

We argue that controlling energy allocation is an increasingly useful and important feature for operating systems, especially on mobile devices. We present two new low-level abstractions in the Cinder operating system, reserves and taps, which ... Keywords: energy, mobile phones, power management

Arjun Roy; Stephen M. Rumble; Ryan Stutsman; Philip Levis; David Mazières; Nickolai Zeldovich

2011-04-01T23:59:59.000Z

430

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

431

Mass Tracking System Software [Nuclear Waste Management using  

NLE Websites -- All DOE Office Websites (Extended Search)

Mass Tracking System Mass Tracking System Software Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology Mass Tracking System Software Bookmark and Share The NE Division has developed a computer-based Mass Tracking (MTG) system, which is used at the Idaho National Laboratory Fuel Conditioning Facility (FCF) to maintain a real-time accounting of the inventory of containers and

432

Adaptive power management in energy harvesting systems  

Science Conference Proceedings (OSTI)

Recently, there has been a substantial interest in the design of systems that receive their energy from regenerative sources such as solar cells. In contrast to approaches that attempt to minimize the power consumption we are concerned with adapting ...

Clemens Moser; Lothar Thiele; Davide Brunelli; Luca Benini

2007-04-01T23:59:59.000Z

433

System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)  

Science Conference Proceedings (OSTI)

This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

VAN BEEK, J.E.

2000-05-05T23:59:59.000Z

434

Power Contro Energy Management and Market Systems  

SciTech Connect

More efficient use of the nation's electrical energy infrastructure will result in minimizing the cost of energy to the end user. Using real time electrical market information coupled with defined rules, market opportunities can be identified that provide economic benefit for both users and marketers of electricity. This report describes the design of one such system and the features a fully functional system would provide. This report documents several investigated methods of controlling load diversity or shifting.

Tom Addison; Andrew Stanbury

2005-12-15T23:59:59.000Z

435

Cost-efficient monitoring of water quality in district heating systems This article examines the monitoring strategy for water quality in a large Danish district  

E-Print Network (OSTI)

Cost-efficient monitoring of water quality in district heating systems This article examines the monitoring strategy for water quality in a large Danish district heating system ­ and makes a proposal for a technical and economic improvement. Monitoring of water quality in district heating systems is necessary

436

Fuel quality issues in stationary fuel cell systems.  

SciTech Connect

Fuel cell systems are being deployed in stationary applications for the generation of electricity, heat, and hydrogen. These systems use a variety of fuel cell types, ranging from the low temperature polymer electrolyte fuel cell (PEFC) to the high temperature solid oxide fuel cell (SOFC). Depending on the application and location, these systems are being designed to operate on reformate or syngas produced from various fuels that include natural gas, biogas, coal gas, etc. All of these fuels contain species that can potentially damage the fuel cell anode or other unit operations and processes that precede the fuel cell stack. These detrimental effects include loss in performance or durability, and attenuating these effects requires additional components to reduce the impurity concentrations to tolerable levels, if not eliminate the impurity entirely. These impurity management components increase the complexity of the fuel cell system, and they add to the system's capital and operating costs (such as regeneration, replacement and disposal of spent material and maintenance). This project reviewed the public domain information available on the impurities encountered in stationary fuel cell systems, and the effects of the impurities on the fuel cells. A database has been set up that classifies the impurities, especially in renewable fuels, such as landfill gas and anaerobic digester gas. It documents the known deleterious effects on fuel cells, and the maximum allowable concentrations of select impurities suggested by manufacturers and researchers. The literature review helped to identify the impurity removal strategies that are available, and their effectiveness, capacity, and cost. A generic model of a stationary fuel-cell based power plant operating on digester and landfill gas has been developed; it includes a gas processing unit, followed by a fuel cell system. The model includes the key impurity removal steps to enable predictions of impurity breakthrough, component sizing, and utility needs. These data, along with process efficiency results from the model, were subsequently used to calculate the cost of electricity. Sensitivity analyses were conducted to correlate the concentrations of key impurities in the fuel gas feedstock to the cost of electricity.

Papadias, D.; Ahmed, S.; Kumar, R. (Chemical Sciences and Engineering Division)

2012-02-07T23:59:59.000Z

437

Distributed Control System Life Cycle Management: Guidelines for Planning and Managing the Life Cycle of Distributed Control Systems  

Science Conference Proceedings (OSTI)

Power producers are often not concerned with the life cycle of a control system until they receive a notification from the manufacturer that the system is no longer supported. This situation results in a reactive effort to gain information, develop a plan, obtain funding, and execute an upgrade project. Effectively managing the life cycle of a control system requires a proactive approach, including gaining information about the installed system and its expected life span and the available ...

2013-12-19T23:59:59.000Z

438

IT Project Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Management IT Project Management Qualification, Engineering and Quality Assurance The purpose of the Department of Energy (DOE) IT Project Management, Engineering, and Quality Assurance effort is to lead and provide guidance to information technology programs, and to support the successful development and maintenance of Departmental site-specific information systems. This is accomplished by fostering and mentoring continuous growth and maturity in the use of best practices for project management, software systems engineering, and quality assurance and soliciting DOE-wide participation and successes for sharing. IT Project Management, Engineering, and Quality Assurance is a component of the DOE Enterprise Architecture Program and Capital Planning and Investment

439

Standard Data Exchanges for Distribution System Management  

SciTech Connect

Databases and software tools for electric power distribution systems have not been integrated, and this leads to extra costs and restrictions imposed on utilities and other stakeholders. For example, distributed resource integration studies and modern grid technology assessments are more difficult and costly. New vendors face high market entry barriers, because it’s necessary to interface with large and customized data systems at each potential utility customer. This project promotes data and software tool integration, through a set of data translators based on a common object model. The data translators are delivered as open-source software, using appropriate Web software technologies. The parties who benefit include electric utilities (and their ratepayers), researchers at government laboratories and universities, small software companies wishing to enter the electric utility market, and parties wishing to interconnect distributed generation to a utility system.

Thomas E. McDermott

2007-10-05T23:59:59.000Z

440

Office of Quality Assurance  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Assurance Quality Assurance QUALITY ASSURANCE IN THE DEPARTMENT OF ENERGY DOE has established Quality Policy, Principles and Value Added Requirement Attributes that apply to all work and are focused on performance, customer expectations, and improvement. When properly implemented, the principles and requirements form a management system to plan, perform, assess, and improve work. The requirements are performance oriented and offer unlimited implementation flexibility. The DOE quality management system moves beyond the traditional quality assurance requirements that had become narrowly focused on safety systems, paper, compliance, and inspections. The management system is designed to link with an organization's strategic plan to support mission achievement and the delivery of products and services. The Department's commitment to environment, safety, and health also relies, upon work being conducted within an effective management system. DOE line managers and contracting officers must understand these two fundamental purposes for the QA requirements and ensure the QA Order and rule are specified in each major contract (including those contracts using the Work Smart Standards process to satisfy DOE Acquisition regulation 48 CFR 970.5223-1).

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

The dynamic structure of management support systems: theory development, research focus, and direction  

Science Conference Proceedings (OSTI)

Using a systems perspective, a conceptual model is developed that encompasses a broad class of systems whose fundamental purpose is the support of managerial actions and decision making. The term management support systems (MSS) is used to label this ... Keywords: business intelligence, decision support systems, executive information systems, knowledge management systems, management support systems

Thomas D. Clark; Mary C. Jones; Curtis P. Armstrong

2007-09-01T23:59:59.000Z

442

Managing Manure with Biogas Recovery Systems  

E-Print Network (OSTI)

emissions and capture biogas--a useful source of energy. About Anaerobic Digestion Biogas recovery systems are sometimes known as anaerobic digesters, because they use a process called anaerobic digestion. (Conventional lagoons oper- ate on the same biological principle.) During anaerobic digestion, bacteria break down

Mukhtar, Saqib

443

Water Management in Ash-Handling Systems  

Science Conference Proceedings (OSTI)

In 1980, EPA proposed revisions to the effluent standards and guidelines for fly ash and bottom ash transport systems. This review of utility practices provides a comprehensive account of the operation of and problems experienced in wet handling of bottom and fly ash and suggests areas for further research.

1987-08-24T23:59:59.000Z

444

Buffer management in relational database systems  

Science Conference Proceedings (OSTI)

The hot-set model, characterizing the buffer requirements of relational queries, is presented. This model allows the system to determine the optimal buffer space to be allocated to a query; it can also be used by the query optimizer to derive efficient ...

Giovanni Maria Sacco; Mario Schkolnick

1986-12-01T23:59:59.000Z

445

Enterprise Data Quality: A Pragmatic Approach  

Science Conference Proceedings (OSTI)

Enterprise data—the data that is created, used and shared by a corporation in conducting business—is a critical business resource that must be analyzed, architected and managed with data quality as a guiding principle. This paper presents ... Keywords: data quality methodology, data quality metrics, data quality, distributed systems, process flow through

Amjad Umar; George Karabatis; Linda Ness And Bruce Horowitz; Ahmed Elmagardmid

1999-10-01T23:59:59.000Z

446

Meeting Minutes from Automated Home Energy Management System Expert Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Energy Management System Expert Meeting Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 - 8:45 Welcome and Debriefing of Building America and Home Energy Management Research- Lew Pratsch, DOE 8:45 - 9:15 Utilities Trends- Smart Grid Projects and Integration With Home Controls - Mike Keesee, SMUD 9:15 - 9:45 Thoughts on Controls System Performance Requirements - Rich Brown, LBL 9:45 - 10:15 Efficiency Trends in Consumer Electronics - Kurtis McKenney, TIAX 10:15 - 10:30 Session Break 10:30 - 11:00 Cloud Computing (Web Data Computing, Data Storage) Trends - Troy Batterberry, Microsoft 11:00- 11:30 Cloud Computing (Web Data Computing, Data Storage) Trends - Tom Sly via Net Conference 11:30 - 12:00 Smart Appliance Trends / Home Area Network Trends - David Najewicz, GE

447

Concept for Management of the Future Electricity System (Smart Grid  

Open Energy Info (EERE)

Concept for Management of the Future Electricity System (Smart Grid Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

448

An Update of Dermatologist Usage of the Physician Quality Reporting System in Colorado for 2011  

E-Print Network (OSTI)

Reporting Initiatives in Colorado. Journal of the AmericanQuality Reporting System in Colorado for 2011 Jeffrey H.of Dermatology, University of Colorado Denver, Aurora, CO

Dunn, Jeffrey H; Alvarez, Bryan T; Dellavalle, Robert P; Dunnick, Cory A

2013-01-01T23:59:59.000Z

449

Failure mode and effect analysis-based quality assurance for dynamic MLC tracking systems  

SciTech Connect

Purpose: To develop and implement a failure mode and effect analysis (FMEA)-based commissioning and quality assurance framework for dynamic multileaf collimator (DMLC) tumor tracking systems. Methods: A systematic failure mode and effect analysis was performed for a prototype real-time tumor tracking system that uses implanted electromagnetic transponders for tumor position monitoring and a DMLC for real-time beam adaptation. A detailed process tree of DMLC tracking delivery was created and potential tracking-specific failure modes were identified. For each failure mode, a risk probability number (RPN) was calculated from the product of the probability of occurrence, the severity of effect, and the detectibility of the failure. Based on the insights obtained from the FMEA, commissioning and QA procedures were developed to check (i) the accuracy of coordinate system transformation, (ii) system latency, (iii) spatial and dosimetric delivery accuracy, (iv) delivery efficiency, and (v) accuracy and consistency of system response to error conditions. The frequency of testing for each failure mode was determined from the RPN value. Results: Failures modes with RPN{>=}125 were recommended to be tested monthly. Failure modes with RPN<125 were assigned to be tested during comprehensive evaluations, e.g., during commissioning, annual quality assurance, and after major software/hardware upgrades. System latency was determined to be {approx}193 ms. The system showed consistent and accurate response to erroneous conditions. Tracking accuracy was within 3%-3 mm gamma (100% pass rate) for sinusoidal as well as a wide variety of patient-derived respiratory motions. The total time taken for monthly QA was {approx}35 min, while that taken for comprehensive testing was {approx}3.5 h. Conclusions: FMEA proved to be a powerful and flexible tool to develop and implement a quality management (QM) framework for DMLC tracking. The authors conclude that the use of FMEA-based QM ensures efficient allocation of clinical resources because the most critical failure modes receive the most attention. It is expected that the set of guidelines proposed here will serve as a living document that is updated with the accumulation of progressively more intrainstitutional and interinstitutional experience with DMLC tracking.

Sawant, Amit; Dieterich, Sonja; Svatos, Michelle; Keall, Paul [Stanford University, Stanford, California 94394 (United States); Varian Medical Systems, Palo Alto, California 94304 (United States); Stanford University, Stanford, California 94394 (United States)

2010-12-15T23:59:59.000Z

450

Development and implementation of information systems for the DOE's National Analytical Management Program (NAMP).  

SciTech Connect

The Department of Energy (DOE) faces a challenging environmental management effort, including environmental protection, environmental restoration, waste management, and decommissioning. This effort requires extensive sampling and analysis to determine the type and level of contamination and the appropriate technology for cleanup, and to verify compliance with environmental regulations. Data obtained from these sampling and analysis activities are used to support environmental management decisions. Confidence in the data is critical, having legal, regulatory, and therefore, economic impact. To promote quality in the planning, management, and performance of these sampling and analysis operations, DOE's Office of Environmental Management (EM) has established the National Analytical Management Program (NAMP). With a focus on reducing the estimated costs of over $200M per year for EM's analytical services, NAMP has been charged with developing products that will decrease the costs for DOE complex-wide environmental management while maintaining quality in all aspects of the analytical data generation. As part of this thrust to streamline operations, NAMP is developing centralized information systems that will allow DOE complex personnel to share information about EM contacts at the various sites, pertinent methodologies for environmental restoration and waste management, costs of analyses, and performance of contracted laboratories.

Streets, W. E.

1999-01-29T23:59:59.000Z

451

Quality Guidelines for Energy System Studies: Detailed Coal Specifications  

NLE Websites -- All DOE Office Websites (Extended Search)

Q Q U U A A L L I I T T Y Y G G U U I I D D E E L L I I N N E E S S F F O O R R E E N N E E R R G G Y Y S S Y Y S S T T E E M M S S T T U U D D I I E E S S D D e e t t a a i i l l e e d d C C o o a a l l S S p p e e c c i i f f i i c c a a t t i i o o n n s s DOE/NETL-2010/???? DOE/NETL-401/012111 National Energy Technology Laboratory Office of Program Planning and Analysis 2 January 2012 Detailed Coal Specifications Quality Guidelines for Energy System Studies Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.

452

The Role of Benchmarking in Promoting Strong Energy Management Systems  

E-Print Network (OSTI)

The significance of formalized energy management practices and programs in driving and sustaining energy efficiency improvements within the industrial sector has become more widely recognized over the past several years. The release of the ISO 50001 energy management standard will also further elevate the role of energy management systems. For over the past 10 years, the US EPA's ENERGY STAR Commercial and Industrial program have focused on promoting and supporting the development of strong corporate management programs. A key aspect of facilitating the establishment of energy management programs has been the development of benchmarking tools that help companies evaluate the energy performance and practices. This paper will examine some of the lessons learned in developing both quantitative and qualitative energy management benchmarking tools and the importance of establishing good energy performance indicators. The paper will examine the pros and cons of different types of quantitative energy performance benchmarks. The value of qualitative benchmarking tools to gauge management practices will also be discussed. Lastly, recommendations for how to further the development energy benchmarks shall be presented.

Tunnessen, W.

2010-01-01T23:59:59.000Z

453

A privilege management and enforcement system for distributed resource sharing  

Science Conference Proceedings (OSTI)

The Internet has been identified as one of the most dangerous aspects for an organization in today's information based world. Unauthorized access, misuse, and manipulation of data can create havoc. We have chosen a distributed environment with thousands ... Keywords: DCE based authentication, Distributed Informatics Computing and Collaborative Environments project, Internet, World Wide Web based interfaces, X Windows, access control, authorization, controlled access, data manipulation, delegated resource management, distributed environment, distributed resource sharing, end user access, enforcement system, information based world, operating system, privilege management, unauthorized access

K. J. Maly; A. Gupta; B. Kvande; I. B. Levinstein; R. Mukkamala; S. Nanjangud; M. Olson; R. Whitney; R. Chambers

1996-06-01T23:59:59.000Z

454

The Management of the Effects of a Hurricane: A Study of Higher Education Crisis Management Processes as Viewed through a Performance Management System  

E-Print Network (OSTI)

On September 13, 2008, Hurricane Ike, a huge storm with tropical storm force or greater winds extending 275 miles from the eye, made landfall in Galveston, Texas submerging over 75% of the city. In response to this crisis, Texas A&M University at Galveston, a small ocean oriented satellite school of 2000 students, deployed a never-before-attempted business continuity plan, relocating 91% of the student body and campus operations 150 miles inland to the mother campus of Texas A&M University in nine days. As a result, Texas A&M University at Galveston successfully weathered the storm and enjoyed a record enrollment the following spring semester. This dissertation utilized a case study methodology to look at the approach/planning process that went into the plan, the deployment of the plan, and the learning that took place throughout the crisis. In addition, the case study was considered through the use of a performance management system, specifically the Quality Texas Foundation - Engagement Level Criteria based on the Malcom Baldrige Quality Management Criteria, to determine whether this criteria might be appropriate for assessing future crisis response in higher education. All Texas A&M University at Galveston crisis team members were interviewed using the criteria to guide the discussion. The study revealed that the approach taken by the Texas A&M University at Galveston crisis team members was very timely in that a number of significant changes were implemented in the plan only a year prior to Hurricane Ike, initiated in response to Hurricanes Katrina and Rita’s impact on other universities. Furthermore while the approach outlined a plan that guided the relocation effort, significant areas that were not directly related to the relocation of the students, such as plans for the workforce not directly involved in the relocation and community involvement, were not adequately addressed. In deployment of the plan, the development of guiding principles to further align the thousands of decisions that would take place proved critical. The study further identified that the crisis team members incorporated learning into the approach and deployment of the plan, and established a very comprehensive assessment process immediately after the crisis. The study also revealed a number of valuable lessons for practice for use by other institutions as they develop their own crisis management plans. Lastly, the Quality Texas Foundation - Engagement Level Criteria provided a solid platform for crisis management assessment in higher education, particularly in large scale disaster type crises.

Sutherland, Todd

2013-08-01T23:59:59.000Z

455

Energy management system with programmable thermostat  

Science Conference Proceedings (OSTI)

An electronic system and method including a user programmable thermostat for measuring temperature at the situs of the measurement unit and for signaling and controlling a remotely located energy controller which is connected to the programmable thermostat. By utilizing a multiplexed signal communication channel between the programmable thermostat and the energy controller, the energy controller activates preselected energy using units which may, for example, include a furnace and air conditioning units for controlling the temperature at the measurement unit situs and a power shedder unit for shedding energy usage to conserve energy all in accordance with a user provided program.

Stewart, J.T.

1983-05-10T23:59:59.000Z

456

West Village Community: Quality Management Processes and Preliminary Heat Pump Water Heater Performance  

Science Conference Proceedings (OSTI)

West Village, a multi-use project underway at the University of California Davis, represents a ground-breaking sustainable community incorporating energy efficiency measures and on-site renewable generation to achieve community-level Zero Net Energy (ZNE) goals. The project when complete will provide housing for students, faculty, and staff with a vision to minimize the community's impact on energy use by reducing building energy use, providing on-site generation, and encouraging alternative forms of transportation. This focus of this research is on the 192 student apartments that were completed in 2011 under Phase I of the West Village multi-year project. The numerous aggressive energy efficiency measures implemented result in estimated source energy savings of 37% over the B10 Benchmark. There are two primary objectives of this research. The first is to evaluate performance and efficiency of the central heat pump water heaters as a strategy to provide efficient electric water heating for net-zero all-electric buildings and where natural gas is not available on site. In addition, effectiveness of the quality assurance and quality control processes implemented to ensure proper system commissioning and to meet program participation requirements is evaluated. Recommendations for improvements that could improve successful implementation for large-scale, high performance communities are identified.

Dakin, B.; Backman, C.; Hoeschele, M.; German, A.

2012-11-01T23:59:59.000Z

457

AQUIS: A PC-based air quality and permit information system  

SciTech Connect

The Air Quality Utility Information System (AQUIS) was developed to calculate and track emissions, permits, and related information. The system runs on IBM-compatible personal computers using dBASE IV. AQUIS tracks more than 900 data items distributed among various source categories and allows the user to enter specific information on permit control devices, stacks, and related regulatory requirements. The system is currently operating at seven US Air Force Materiel Command facilities, large industrial operations involved in the repair and maintenance of aircraft. Environmental management personnel are responsible for the compliance status of as many as l,000 sources at each facility. The usefulness of the system has been enhanced by providing a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing specified information. In addition to the standard six pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emission estimates. This capability will be useful in developing air toxics inventories and control plans.

Smith, A.E.; Huber, C.C.; Tschanz, J. [Argonne National Lab., IL (United States); Ryckman, J.S. Jr. [Air Force Air Materiel Command, Wright-Patterson AFB, OH (United States)

1992-09-01T23:59:59.000Z

458

Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).  

Science Conference Proceedings (OSTI)

Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

2004-11-01T23:59:59.000Z

459

2012 Grid Strategy: Distribution Management System (DMS) Advanced Applications for Distributed Energy Resources  

Science Conference Proceedings (OSTI)

This report provides an overview of the management systems and the advanced applications that utilities in the Electric Power Research Institute’s (EPRI’s) multi-year Smart Grid Demonstration Initiative are using or plan to use to manage the distribution system and to monitor and control distributed energy resources (DER). The management systems covered in this report are the distribution management system (DMS), the distributed energy resource management system (DERMS), and the demand ...

2012-10-10T23:59:59.000Z

460

Weed Manager-A model-based decision support system for weed management in arable crops  

Science Conference Proceedings (OSTI)

Weed Manager is a model-based decision support system to assist arable farmers and advisers in weed control decisions on two time scales: within a single season and over several years in a rotation. The single season decision is supported by a wheat ... Keywords: Decision support, Dynamic programming, Heuristics, Models, Optimisation, Stochastic, Weeds

D. J. Parsons; L. R. Benjamin; J. Clarke; D. Ginsburg; A. Mayes; A. E. Milne; D. J. Wilkinson

2009-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality management system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

T&D System Design and Construction for Enhanced Reliability and Power Quality  

Science Conference Proceedings (OSTI)

Transmission and Distribution (TD) design and construction standards and practices can impact the quality of power supplied to end users. Standards engineers lack clear guidelines on how to optimize the power quality performance of electrical systems. Traditional design and construction standards/practices are based on optimizing cost with system reliability. However, in some cases, improvement in service reliability could come at the expense of service quality. This project combines prior research from ...

2006-03-16T23:59:59.000Z

462

IMRT Quality Assurance Using a Second Treatment Planning System  

SciTech Connect

We used a second treatment planning system (TPS) for independent verification of the dose calculated by our primary TPS in the context of patient-specific quality assurance (QA) for intensity-modulated radiation therapy (IMRT). QA plans for 24 patients treated with inverse planned dynamic IMRT were generated using the Nomos Corvus TPS. The plans were calculated on a computed tomography scan of our QA phantom that consists of three Solid Water slabs sandwiching radiochromic films, and an ion chamber that is inserted into the center slab of the phantom. For the independent verification, the dose was recalculated using the Varian Eclipse TPS using the multileaf collimator files and beam geometry from the original plan. The data was then compared in terms of absolute dose to the ion chamber volume as well as relative dose on isodoses calculated at the film plane. The calculation results were also compared with measurements performed for each case. When comparing ion chamber doses, the mean ratio was 0.999 (SD 0.010) for Eclipse vs. Corvus, 0.988 (SD 0.020) for the ionization chamber measurements vs. Corvus, and 0.989 (SD 0.017) for the ionization chamber measurements vs. Eclipse. For 2D doses with gamma histogram, the mean value of the percentage of pixels passing the criteria of 3%, 3 mm was 94.4 (SD 5.3) for Eclipse vs. Corvus, 85.1 (SD 10.6) for Corvus vs. film, and 93.7 (SD 4.1) for Eclipse vs. film; and for the criteria of 5%, 3 mm, 98.7 (SD 1.5) for Eclipse vs. Corvus, 93.0 (SD 7.8) for Corvus vs. film, and 98.0 (SD 1.9) for Eclipse vs. film. We feel that the use of the Eclipse TPS as an independent, accurate, robust, and time-efficient method for patient-specific IMRT QA is feasible in clinic.

Anjum, Muhammad Naeem [McGill University Health Center, Department of Medical Physics, Montreal General Hospital, Montreal, Quebec (Canada); Department of Physics, The Islamia University of Bahawalpur (Pakistan); Parker, William, E-mail: william@medphys.mcgill.c [McGill University Health Center, Department of Medical Physics, Montreal General Hospital, Montreal, Quebec (Canada); Ruo, Russell; Aldahlawi, Ismail [McGill University Health Center, Department of Medical Physics, Montreal General Hospital, Montreal, Quebec (Canada); Afzal, Muhammad [Department of Physics, The Islamia University of Bahawalpur (Pakistan)

2010-01-01T23:59:59.000Z

463

Use of energy management systems for performance monitoring of industrial  

NLE Websites -- All DOE Office Websites (Extended Search)

Use of energy management systems for performance monitoring of industrial Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial load-shaping measures Publication Type Journal Article Year of Publication 1988 Authors Akbari, Hashem, Mashuri Warren, Anibal De T. Almeida, Deborah J. Connell, and Jeffrey P. Harris Journal Energy Volume 13 Pagination 253-263 Abstract We have studied the use of industrial energy management and control systems (EMCSs) for monitoring the performance of electric load-shaping measures in three of California's most electricity-intensive and rapidly growing industrial sectors: food, plastics, and computing equipment and electronics. In this paper, we summarize current load-shaping strategies, report on the current use of EMCSs in selected industries, and recommend ways for electric utility companies to verify the potential of EMCSs for performance monitoring. We conclude that EMCSs can be used to collect and store data for evaluating industrial load shaping. Some sophisticated EMCSs are currently being used for this purpose, mostly in larger electronics firms. Most EMCSs now available need to be customized to monitor a particular facility. We also conclude that electric utility companies can encourage the use of EMCSs for performance monitoring by helping to educate their industrial customers about EMCSs, establishing protocols to standardize communication between EMCSs, and testing EMCSs with data-logging functions at demonstration sites.

464

Dispersed storage and generation impacts on energy management systems  

SciTech Connect

This paper examines the various technologies for small-scale generation or storage of electricity known collectively as dispersed storage and generation, DSG. DSGs are seen to be an inhomogeneous group. The impact on energy management due to the integration of DSGs into the power system is examined, with emphasis on control, monitoring and operating problems.

Kirkham, H.; Klein, J.

1983-02-01T23:59:59.000Z

465

An energy management framework for energy harvesting embedded systems  

Science Conference Proceedings (OSTI)

Energy harvesting (also known as energy scavenging) is the process of generating electrical energy from environmental energy sources. There exists a variety of different energy sources such as solar energy, kinetic energy, or thermal energy. In recent ... Keywords: Power management, embedded systems, energy harvesting, model predictive control, real-time scheduling, reward maximization

Clemens Moser; Jian-Jia Chen; Lothar Thiele

2010-06-01T23:59:59.000Z

466

Experimental Evaluation of a Waste Management Robot System  

Science Conference Proceedings (OSTI)

Recently, there are many problems caused by global environment warming. The limited natural resources require efficient methods and systems for recycling and processing of the wastes for a better environment. One of the problems today is the processing ... Keywords: Waste Management, Robot, Compost, Sensor Technology

Keita Matsuo; Kouhei Umezaki; Evjola Spaho; Leonard Barolli; Jiro Iwashige; Makoto Takizawa

2012-07-01T23:59:59.000Z

467

Memory energy management for an enterprise decision support system  

Science Conference Proceedings (OSTI)

Energy efficiency is an important factor in designing and configuring enterprise servers. In these servers, memory may consume 40% of the total system power. Different memory configurations (sizes, numbers of ranks, speeds, etc.) can have significant ... Keywords: memory power management, power-aware memory

Karthik Kumar; Kshitij Doshi; Martin Dimitrov; Yung-Hsiang Lu

2011-08-01T23:59:59.000Z

468