National Library of Energy BETA

Sample records for quality control procedures

  1. Quality Procedure - Document Control | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Quality Procedure - Document Control This procedure establishes the responsibilities and process for preparing, managing, and revising EM Headquarters Office of Standards and Quality Assurance controlled documents in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Document Control (2.6 MB) More Documents & Publications Quality Procedure - Supplier Qualification Quality Procedure - Approved Suppliers List Quality Procedure - Records

  2. Quality Procedure - Memo/Correspondence Control and Tracking | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Memo/Correspondence Control and Tracking Quality Procedure - Memo/Correspondence Control and Tracking This procedure establishes the responsibilities and process for issuing memoranda or correspondence originating within the Office of Standards and Quality Assurance to the Field and Headquarters offices. Quality Procedure - Memo/Correspondence Control and Tracking (2.3 MB) More Documents & Publications Quality Procedure - Document Control Quality Procedure - Audits Quality

  3. Environmental Management (EM) Quality Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Procedure - Records Management Quality Procedure - MemoCorrespondence Control and Tracking Quality Procedure - Stop Work Quality Procedure - Supplier Qualification ...

  4. Quality assurance/quality control (QA/QC) procedures for hazardous-waste incineration. Handbook

    SciTech Connect (OSTI)

    Dux, T.; Gilford, P.; Bergman, F.; Boomer, B.; Hooton, D.

    1990-01-01

    The Environmental Protection Agency (EPA) has promulgated regulations for hazardous waste incinerators under the Resource Conservation and Recovery Act. These regulations require the permit applicant to conduct trial burns to demonstrate compliance with the regulatory limits and provide data needed to write the individual permits. Trial burns require a Quality Assurance Project Plan (QAPjP) with quality assurance/quality control (QA/QC) procedures to control and evaluate data quality. The primary focus of the handbook is the trial burn itself; however, a discussion of the QA/QC for routine incinerator monitoring and permit compliance is included in a separate chapter. The area has slightly different requirements and objectives from those of the trial burn. The trial burn should be viewed as a short-term project with a defined beginning and end, while compliance monitoring is considered an ongoing process.

  5. Quality Procedure - Audits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audits Quality Procedure - Audits This procedure establishes the responsibilities and process for scheduling, planning, performing, and reporting Quality Assurance (QA) audits of EM-QA-001, Environmental Management Quality Assurance Program implementation at EM Headquarters and Field Office programs, facilities and projects. Quality Procedure - Audits (5.04 MB) More Documents & Publications Quality Procedure - Document Control Quality Procedure - Supplier Qualification Quality Procedure -

  6. Quality control procedures for dynamic treatment delivery techniques involving couch motion

    SciTech Connect (OSTI)

    Yu, Victoria Y.; Fahimian, Benjamin P.; Xing, Lei; Hristov, Dimitre H.

    2014-08-15

    In this study, the authors introduce and demonstrate quality control procedures for evaluating the geometric and dosimetric fidelity of dynamic treatment delivery techniques involving treatment couch motion synchronous with gantry and multileaf collimator (MLC). Tests were designed to evaluate positional accuracy, velocity constancy and accuracy for dynamic couch motion under a realistic weight load. A test evaluating the geometric accuracy of the system in delivering treatments over complex dynamic trajectories was also devised. Custom XML scripts that control the Varian TrueBeam STx (Serial #3) axes in Developer Mode were written to implement the delivery sequences for the tests. Delivered dose patterns were captured with radiographic film or the electronic portal imaging device. The couch translational accuracy in dynamic treatment mode was 0.01 cm. Rotational accuracy was within 0.3, with 0.04 cm displacement of the rotational axis. Dose intensity profiles capturing the velocity constancy and accuracy for translations and rotation exhibited standard deviation and maximum deviations below 3%. For complex delivery involving MLC and couch motions, the overall translational accuracy for reproducing programmed patterns was within 0.06 cm. The authors conclude that in Developer Mode, TrueBeam is capable of delivering dynamic treatment delivery techniques involving couch motion with good geometric and dosimetric fidelity.

  7. Development of quality control procedures for mass produced and released Bactrocera Philippinensis (Diptera: Tephritidae) for sterile insect technique programs

    SciTech Connect (OSTI)

    Resilva, S.; Obra, G.; Zamora, N.; Gaitan, E.

    2007-03-15

    Quality control procedures for Bactrocera philippinensis Drew and Hancock 1994 (Diptera: Tephritidae) used in sterile insect technique (SIT) programs were established in the mass rearing facility at the Philippine Nuclear Research Institute. Basic studies on pupal irradiation, holding/packaging systems, shipping procedures, longevity, sterility studies, and pupal eye color determination in relation to physiological development at different temperature regimes were investigated. These studies will provide baseline data for the development of quality control protocols for an expansion of B. philippinensis field programs with an SIT component in the future. (author) [Spanish] Los procedimientos de control de calidad para Bactrocera philippinensis Drew y Hancock 1994 (Diptera: Tephritidae) usados en programas de la tecnica de insecto esteril (TIE) fueron establecidos en la facilidad de cria en masa del Instituto Filipino de Investigacion Nuclear. Estudios basicos sobre la irradiacion de las pupas, sistemas de almacenaje/empaque, procedimientos del envio, longevidad, estudios de esterilidad y la determinacion del color de ojo de la pupa en relacion con el desarrollo fisiologico en regimenes diferentes de temperatura fueron investigados. Estos estudios proveeran una linea de informacion basica para el desarrollo de protocolos de control de calidad para una expansion de los programas de campo para B. philippinensis con un componente de TIS en el futuro. (author)

  8. Quality Procedure - Supplier Qualification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplier Qualification Quality Procedure - Supplier Qualification This procedure establishes the responsibilities and process for supplier qualification activities conducted by Environmental Management (EM) Headquarters (HQ) Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Supplier Qualification (2.03 MB) More Documents & Publications Quality Procedure - Approved Suppliers List Quality Procedure -

  9. Quality Procedure - Document Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Quality Procedure - Document Review This procedure establishes the process for the reivew and approval of Environmental Managemnt (EM) Quality Assurance (QA) program documents as performed by the Office of Standards and Quality Assurance. This procedure also establishes the process for review and approval of other EM documents external to the EM Headquarters Office of Standards and Quality Assurance. Quality Procedure - Document Review (1.97 MB) More Documents & Publications Quality

  10. Quality Procedure - Records Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records Management Quality Procedure - Records Management This procedure establishes the responsibilities and process for identifying and managing records, including quality records, generated by EM Headquarters Office of Standards and Quality Assurance personnel as well as Office of Standards and Quality Assurance representatives located in DOE EM Field Offices in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Records Management (2.32 MB) More

  11. Quality Procedure - Stop Work | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stop Work Quality Procedure - Stop Work This Quality Procedure establishes the Office of Standards and Quality Assurance authority, responsibilities, and instructions to direct that unsafe work be stopped, during the execution and operations of its activities, specifically in oversight activities. this procedure is utilized and accomplished upon coordination with management of the Environmental Management (EM) Headquarters and Field Office. This procedure also provides provisions for the restart

  12. Quality Procedure- Causal Analysis and Trending

    Broader source: Energy.gov [DOE]

    This Quality Procedure describes the process for reviewing and analyzing the cause(s) of issues and findings identified from the Office of Quality Assurance oversight activities and reporting trends as a result of this review.

  13. Quality Procedure - Lessons Learned | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lessons Learned Quality Procedure - Lessons Learned The purpose of this Quality Procedure is to assist the Office of Standards and Quality Assurance personnel during the execution and operation of its activities, specifically in oversight activities, to compile and disseminate information related to lessons learned. The purpose of lessons learned is to share and use knowledge derived from experience to promote the recurrence of desirable outcomes, or preclude the recurrence of undesirable

  14. Quality Procedure - Independent Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  15. Quality Procedure - Approved Suppliers List | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Approved Suppliers List Quality Procedure - Approved Suppliers List This procedure establishes the responsibilities, process, and records for developing and maintaining the Approved Suppliers List (ASL) for EM Headquarters Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Approved Suppliers List (2.06 MB) More Documents & Publications Quality Procedure - Supplier Qualification Quality Procedure -

  16. Data Driven Quality Assurance and Quality Control

    Broader source: Energy.gov [DOE]

    "Data Driven Quality Assurance & Quality Control," Patrick Roche, Conservation Services Group. Provides an overview of data QA/QC system design.

  17. Quality Procedure - Personnel Training and Qualification | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Personnel Training and Qualification Quality Procedure - Personnel Training and Qualification This procedure establishes the requirements for the training and qualification of personnel in the Office of Standards and Quality Assurance, and ensures that office personnel are properly trained and qualified to correctly perform their assigned tasks. Quality Procedure - Personnel Training and Qualification (4.29 MB) More Documents & Publications Quality Procedure - Supplier

  18. Keys to Successful Quality Assurance and Quality Control Programs...

    Office of Environmental Management (EM)

    Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) January 28...

  19. Keys to Successful Quality Assurance and Quality Control Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) Better Buildings Residential Network ...

  20. Quality Procedure - Management Assessment and Self-Assessment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Management Assessment and Self-Assessment Quality Procedure - Management Assessment and Self-Assessment This procedure establishes the roles, responsibilities, requirements, and process for conducting Environmental Management (EM) Office of Standards and Quality Assurance management assessments and self-assessments. Effective management assessments and self-assessments are built on self-evaluation, work process analysis, clear communication with management, and honest feedback that

  1. Sensitivity of health risk estimates to air quality adjustment procedure

    SciTech Connect (OSTI)

    Whitfield, R.G.

    1997-06-30

    This letter is a summary of risk results associated with exposure estimates using two-parameter Weibull and quadratic air quality adjustment procedures (AQAPs). New exposure estimates were developed for children and child-occurrences, six urban areas, and five alternative air quality scenarios. In all cases, the Weibull and quadratic results are compared to previous results, which are based on a proportional AQAP.

  2. Keys to Successful Quality Assurance and Quality Control Programs (101) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) Better Buildings Residential Network Peer Exchange Call Series: Keys to Successful Quality Assurance and Quality Control Programs (101), call slides and discussion summary. Call Slides and Discussion Summary (1.79 MB) More Documents & Publications Quality Control, Standardization of Upgrades, and Workforce Expectations Home

  3. Procedure for Generating Data Quality Reports for SIRS Radiometric Measurements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure for Generating Data Quality Reports for SIRS Radiometric Measurements M. H. L. Anderberg, F. P. Rael, and T. L. Stoffell National Renewable Energy Laboratory Golden, Colorado Introduction The Atmospheric Radiation Measurement (ARM) Program needs high-quality broadband shortwave (SW) (solar) and longwave (LW) irradiance information for the development and validation of atmospheric circulation and climate models. To this end, the National Renewable Energy Laboratory (NREL) performs a

  4. Quality Assurance Procedures for ModCat Database Code Files

    SciTech Connect (OSTI)

    Siciliano, Edward R.; Devanathan, Ram; Guillen, Zoe C.; Kouzes, Richard T.; Schweppe, John E.

    2014-04-01

    The Quality Assurance procedures used for the initial phase of the Model Catalog Project were developed to attain two objectives, referred to as “basic functionality” and “visualization.” To ensure the Monte Carlo N-Particle model input files posted into the ModCat database meet those goals, all models considered as candidates for the database are tested, revised, and re-tested.

  5. Quality Control Inspector: Different Programs, Different Responsibilities

    Broader source: Energy.gov [DOE]

    This document explains the role of the Quality Control Inspector (QCI) in regards to the Home Energy Professional Certification Exam.

  6. EERE Quality Control Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Quality Control Workshop EERE Quality Control Workshop The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) held the Office of Energy Efficiency and Renewable Energy (EERE) Quality Control Workshop on December 9-10, 2013, in Golden, Colorado. The workshop was co-sponsored by the following EERE offices: Fuel Cell Technologies Office Solar Energy Technologies Office Vehicle Technologies Office Building Technologies Office Advanced Manufacturing Office. The

  7. NREL Job Task Analysis: Quality Control Inspector

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2011-05-01

    A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence.

  8. Quality Control Inspector: Different Programs, Different Responsibilit...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications QCI Exam Test-Taking Tips from Community Housing Partners (CHP) Assorted QCI Tips and Standards Review Quality Control Inspector (QCI) Pre-Exam Quiz...

  9. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential ...

  10. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  11. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance. [Contains Glossary

    SciTech Connect (OSTI)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs.

  12. Minimizing damage to a propped fracture by controlled flowback procedures

    SciTech Connect (OSTI)

    Robinson, B.M.; Holditch, S.A.; Whitehead, W.S.

    1988-06-01

    Severe fracture-conductivity damage can result from proppant crushing and/or proppant flowback into the wellbore. Such damage is often concentrated near the wellbore and can directly affect postfracture performance. Most of the time severe fracture-conductivity damage can be minimized by choosing the correct type of proppant for a particular well. In many cases, however, this is not enough. To minimize excessive crushing or to prevent proppant flowback, it is also necessary to control carefully the flowback of the well after the treatment. Specific procedures can be followed to minimize severe fracture-conductivity damage. These procedures involve controlling the rates at which load fluids are recovered and maximizing backpressure against the formation. These procedures require much more time and effort than is normally spent on postfracture cleanup; however, the efforts could result in better performance.

  13. Quality control and statistical process control for nuclear analytical measurements

    SciTech Connect (OSTI)

    Seymour, R.; Sergent, F.; Clark, W.H.C.; Gleason, G.

    1993-12-31

    The same driving forces that are making businesses examine quality control of manufacturing processes are making laboratories reevaluate their quality control programs. Increased regulation (accountability), global competitiveness (profitability), and potential for litigation (defensibility) are the principal driving forces behind the development and implementation of QA/QC programs in the nuclear analytical laboratory. Both manufacturing and scientific quality control can use identical statistical methods, albeit with some differences in the treatment of the measured data. Today, the approaches to QC programs are quite different for most analytical laboratories as compared with manufacturing sciences. This is unfortunate because the statistical process control methods are directly applicable to measurement processes. It is shown that statistical process control methods can provide many benefits for laboratory QC data treatment.

  14. Hawaii Office of Environmental Quality Control Webpage | Open...

    Open Energy Info (EERE)

    Office of Environmental Quality Control Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Office of Environmental Quality Control Webpage...

  15. Hawaii Department of Health Office of Environmental Quality Control...

    Open Energy Info (EERE)

    Office of Environmental Quality Control Jump to: navigation, search Name: Hawaii Department of Health Office of Environmental Quality Control Address: 235 S. Beretania Suite 702...

  16. EERE Quality Control Workshop Proceedings Released

    Broader source: Energy.gov [DOE]

    The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE) announces the release of the proceedings of the EERE Quality Control Workshop held December 9 and 10, 2013, at the National Renewable Energy Laboratory's Energy Systems Integration Facility in Golden, Colorado.

  17. WinCal system configuration control board (SCCB) operating procedure

    SciTech Connect (OSTI)

    Westsik, G.A.

    1997-03-26

    This document describes the operating procedure for the System Configuration Control Board (SCCB) performed in support of the Windows Calorimeter Control (WinCal) system. This board will consist of representatives from Babcock & Wilcox Hanford Company Babcock & Wilcox Protec, Inc.; and Lockheed Martin Services, Inc. In accordance with agreements for the joint use of the Babcock & Wilcox Hanford Company calorimeters located in the Hanford Site Plutonium Finishing Plant (PFP) Nondestructive Assay Laboratory, concurrence regarding changes to the WinCal system will be obtained from the International Atomic Energy Agency (IAEA). Further, changes to the WinCal software will be communicated to Los Alamos National Laboratory.

  18. Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures. For more information on these procedures please click on the items below: Federal Advisory Committee Act Nevada Site Specific Advisory Board Standard Operating Procedures Advisory Committee Management Program Manual National Charter EM Site Specific Advisory Board Policies and Procedures Desk Reference Send mail to

  19. NREL Job Task Analysis: Quality Control Inspector | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control Inspector NREL Job Task Analysis: Quality Control Inspector A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence. NREL Job Task Analysis: Quality Control Inspector (332.56 KB) More Documents & Publications Training Self-Assessment Preparing for the Quality Control Inspector Certification Exam NREL Job Task Analysis: Energy Auditor

  20. Nevada Air Quality Control Permitting Guidance Webpage | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Air Quality Control Permitting Guidance Webpage Abstract Provides overview of air quality...

  1. WC 26 - Water Quality Control Administrative Provisions | Open...

    Open Energy Info (EERE)

    26 - Water Quality Control Administrative Provisions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: WC 26 - Water Quality...

  2. Issues and Experiences on Radioactive Waste Quality Control / Quality Assurance with Regard to Future Disposal

    SciTech Connect (OSTI)

    Beckmerhagen, I.; Brennecke, P.; Steyer, S.; Bandt, G.

    2006-07-01

    In the Federal Republic of Germany all types of radioactive waste (short-lived, long-lived) are to be disposed of in deep geological formations. Thus, the safe management of radioactive waste presupposes an appropriate conditioning of primary waste-to-waste packages suitable for emplacement in a repository as well as the documentation of pre-treatment, processing and packaging steps and the waste package characteristics being relevant for disposal. Due to the operation, decommissioning and dismantling of nuclear facilities as well as the application of radioisotopes in industry, medicine and research and development radioactive waste continuously arises in Germany. In order to manage this waste different measures and procedures regarding its conditioning and quality control/quality assurance were introduced and since many years successfully applied. Waste conditioning is especially characterized by a flexible application of the Konrad waste acceptance requirements. The rationale for this approach is due to the present non-availability of a repository in Germany. Several examples of a 'tailor-made' application of the waste acceptance requirements in treatment, conditioning and documentation processes as well as the quality assurance/quality control processes illustrate the current German approach. (authors)

  3. Quality Control Inspector: Different Programs, Different Responosibilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control Inspector: Different Programs, Different ResponsibiliDes. A Guide to the JTA So& Skills. Inspects implementaDon of the program. þ þ Documents areas needing improvement in report. þ þ May assure homeowners/clients of follow---up work. ý þ Independent 3 rd party inspectors may be hired by an enDty not in a role to promise follow---up to clients or residents. Agency staff can and should assure clients of proper follow---up when appropriate. May address

  4. 5 CCR 1001 - Air Quality Control | Open Energy Information

    Open Energy Info (EERE)

    - Air Quality Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 5 CCR 1001 - Air Quality ControlLegal Abstract...

  5. Porter-Cologne Water Quality Control Act | Open Energy Information

    Open Energy Info (EERE)

    Porter-Cologne Water Quality Control Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Porter-Cologne Water Quality Control Act Published Publisher...

  6. Colorado Water Quality Control Act | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Colorado Water Quality Control ActLegal Abstract Statute setting forth laws for water quality control...

  7. Regional Water Quality Control Boards | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Regional Water Quality Control BoardsLegal Abstract California Regional Water Quality Control Boards,...

  8. EERE Quality Control Workshop Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Quality Control Workshop Agenda Agenda from the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) Quality Control Workshop held December 9-10, ...

  9. Audits and Quality Control on Multifamily Retrofits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audits and Quality Control on Multifamily Retrofits Audits and Quality Control on Multifamily Retrofits Thermal scanning pre- and post-installation ensures an accurate work scope is developed and assists with quality control after the job is done. | Photo by Dennis Schroeder, NREL 28597-C Thermal scanning pre- and post-installation ensures an accurate work scope is developed and assists with quality control after the job is done. | Photo by Dennis Schroeder, NREL 28597-C All energy retrofit

  10. Quality Control, Standardization of Upgrades, and Workforce Expectations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Residential Network Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations, March 27, 2014.

  11. Quality Management

    Broader source: Energy.gov [DOE]

    The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and...

  12. Microsoft Word - Appendix E - Erosion Control M&M Inspection Procedure.docx

    Office of Legacy Management (LM)

    E Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure This page intentionally left blank LMS/RFS/S04532 Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure April 2012 This page intentionally left blank U.S. Department of Energy Rocky Flats Erosion Control Monitoring and Maintenance Inspection Procedure April 2012 Doc. No. S04532 Page 1 1.0 Introduction The Erosion Control Plan for Rocky Flats Property Central

  13. Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure?

    SciTech Connect (OSTI)

    Dutton, Spencer M.; Mendell, Mark J.; Chan, Wanyu R.

    2013-05-13

    Minimum outdoor air ventilation rates (VRs) for buildings are specified in standards, including California?s Title 24 standards. The ASHRAE ventilation standard includes two options for mechanically-ventilated buildings ? a prescriptive ventilation rate procedure (VRP) that specifies minimum VRs that vary among occupancy classes, and a performance-based indoor air quality procedure (IAQP) that may result in lower VRs than the VRP, with associated energy savings, if IAQ meeting specified criteria can be demonstrated. The California Energy Commission has been considering the addition of an IAQP to the Title 24 standards. This paper, based on a review of prior data and new analyses of the IAQP, evaluates four future options for Title 24: no IAQP; adding an alternate VRP, adding an equivalent indoor air quality procedure (EIAQP), and adding an improved ASHRAE-like IAQP. Criteria were established for selecting among options, and feedback was obtained in a workshop of stakeholders. Based on this review, the addition of an alternate VRP is recommended. This procedure would allow lower minimum VRs if a specified set of actions were taken to maintain acceptable IAQ. An alternate VRP could also be a valuable supplement to ASHRAE?s ventilation standard.

  14. Manual for the certification of laboratories analyzing drinking water. Criteria and procedures quality assurance (third edition)

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Contents: introduction; responsibilities; implementation--(regional laboratories and programs; principal state laboratories; local laboratories; other considerations for certification; requirements for maintaining certification status; criteria and procedures for downgrading/revoking certification status; reciprocity; training; technical services; and alternate analytical techniques); chemistry--(personnel; laboratory facilities; laboratory equipment and instrumentation; general laboratory practices; analytical methodology; sample collection, handling, and preservation; quality assurance; records and data reporting; and action response to laboratory); microbiology--(personnel; laboratory facilities; laboratory equipment and instrumentation; general laboratory practices; analytical methodology; sample collection, handling, and preservation; quality assurance; records and data reporting; and action response to laboratory); radiochemistry--(personnel; laboratory facilities; laboratory equipment and instrumentation; general laboratory practices; analytical methodology; sample collection, handling, and preservation; quality assurance; records and data reporting; and action response to laboratory); appendices.

  15. Preparing for the Quality Control Inspector Certification Exam | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Preparing for the Quality Control Inspector Certification Exam Preparing for the Quality Control Inspector Certification Exam This presentation, prepared by the Building Performance Center and the Washington Department of Commerce, identifies how individuals can better prepare for the Home Energy Professional Quality Control Inspector Certification Exam. preparing_for_the_qci_ exam_4_18_14.pptx (17.26 MB) More Documents & Publications QCI Exam Test-Taking Tips from Community

  16. California State Water Resources Control Board 401 Water Quality...

    Open Energy Info (EERE)

    401 Water Quality Certification Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California State Water Resources Control Board 401 Water...

  17. Procedures control total mud losses while drilling in deep water

    SciTech Connect (OSTI)

    Dewar, J. ); Halkett, D. )

    1993-11-01

    In the deepwater (830-1,000 m) drilling program offshore Philippines, reefal limestones were encountered in which total mud losses could be expected because of the presence of large fractures. The danger was that a sudden drop in hydrostatic head (resulting from the losses) could allow any natural gas to enter the well bore quickly. The gas could then migrate up the well bore and form hydrates in the blowout preventers (BOPs). Once hydrates form, they are difficult to remove and can make a BOP stack inoperable. To combat this potential problem, containment procedures were developed to cope with these fluid losses. The philosophy behind the procedures was to prevent hydrocarbons from entering the well bore and, if they did enter, to ensure that they did not move up the well bore and into the riser. Additionally, procedures were developed to allow drilling to continue during the losses and the curing of losses.

  18. ARM: Surface Radiation Measurement Quality Control testing, including climatologically configurable limits

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Shi, Yan; Riihimaki, Laura

    1994-01-07

    Surface Radiation Measurement Quality Control testing, including climatologically configurable limits

  19. Search and Access Control Procedures for Headquarters Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-02-18

    To notify all Headquarters employees of routine security procedure to be followed in the Department of Energy (DOE) Headquarters buildings. This page change notifies employees that they should expect to have their badges touched by security inspector when entering the building. This directive does not cancel another directive. Page change, 8-11-89. Canceled by DOE N 251.11.

  20. Analyst Tools and Quality Control Software for the ARM Data System

    SciTech Connect (OSTI)

    Moore, S.T.

    2004-12-14

    ATK Mission Research develops analyst tools and automated quality control software in order to assist the Atmospheric Radiation Measurement (ARM) Data Quality Office with their data inspection tasks. We have developed a web-based data analysis and visualization tool, called NCVweb, that allows for easy viewing of ARM NetCDF files. NCVweb, along with our library of sharable Interactive Data Language procedures and functions, allows even novice ARM researchers to be productive with ARM data with only minimal effort. We also contribute to the ARM Data Quality Office by analyzing ARM data streams, developing new quality control metrics, new diagnostic plots, and integrating this information into DQ HandS - the Data Quality Health and Status web-based explorer. We have developed several ways to detect outliers in ARM data streams and have written software to run in an automated fashion to flag these outliers.

  1. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect (OSTI)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  2. Requirements for Control Room Computer-Based Procedures for use in Hybrid Control Rooms

    SciTech Connect (OSTI)

    Le Blanc, Katya Lee; Oxstrand, Johanna Helene; Joe, Jeffrey Clark

    2015-05-01

    Many plants in the U.S. are currently undergoing control room modernization. The main drivers for modernization are the aging and obsolescence of existing equipment, which typically results in a like-for-like replacement of analogue equipment with digital systems. However, the modernization efforts present an opportunity to employ advanced technology that would not only extend the life, but enhance the efficiency and cost competitiveness of nuclear power. Computer-based procedures (CBPs) are one example of near-term advanced technology that may provide enhanced efficiencies above and beyond like for like replacements of analog systems. Researchers in the LWRS program are investigating the benefits of advanced technologies such as CBPs, with the goal of assisting utilities in decision making during modernization projects. This report will describe the existing research on CBPs, discuss the unique issues related to using CBPs in hybrid control rooms (i.e., partially modernized analog control rooms), and define the requirements of CBPs for hybrid control rooms.

  3. When Spreadsheets Become Software - Quality Control Challenges and Approaches - 13360

    SciTech Connect (OSTI)

    Fountain, Stefanie A.; Chen, Emmie G.; Beech, John F.; Wyatt, Elizabeth E.; Quinn, Tanya B.; Seifert, Robert W.

    2013-07-01

    As part of a preliminary waste acceptance criteria (PWAC) development, several commercial models were employed, including the Hydrologic Evaluation of Landfill Performance model (HELP) [1], the Disposal Unit Source Term - Multiple Species model (DUSTMS) [2], and the Analytical Transient One, Two, and Three-Dimensional model (AT123D) [3]. The results of these models were post-processed in MS Excel spreadsheets to convert the model results to alternate units, compare the groundwater concentrations to the groundwater concentration thresholds, and then to adjust the waste contaminant masses (based on average concentration over the waste volume) as needed in an attempt to achieve groundwater concentrations at the limiting point of assessment that would meet the compliance concentrations while maximizing the potential use of the landfill (i.e., maximizing the volume of projected waste being generated that could be placed in the landfill). During the course of the PWAC calculation development, one of the Microsoft (MS) Excel spreadsheets used to post-process the results of the commercial model packages grew to include more than 575,000 formulas across 18 worksheets. This spreadsheet was used to assess six base scenarios as well as nine uncertainty/sensitivity scenarios. The complexity of the spreadsheet resulted in the need for a rigorous quality control (QC) procedure to verify data entry and confirm the accuracy of formulas. (authors)

  4. Optimal control of CPR procedure using hemodynamic circulation model

    DOE Patents [OSTI]

    Lenhart, Suzanne M.; Protopopescu, Vladimir A.; Jung, Eunok

    2007-12-25

    A method for determining a chest pressure profile for cardiopulmonary resuscitation (CPR) includes the steps of representing a hemodynamic circulation model based on a plurality of difference equations for a patient, applying an optimal control (OC) algorithm to the circulation model, and determining a chest pressure profile. The chest pressure profile defines a timing pattern of externally applied pressure to a chest of the patient to maximize blood flow through the patient. A CPR device includes a chest compressor, a controller communicably connected to the chest compressor, and a computer communicably connected to the controller. The computer determines the chest pressure profile by applying an OC algorithm to a hemodynamic circulation model based on the plurality of difference equations.

  5. Title 18 Alaska Administrative Code Chapter 50 Air Quality Control...

    Open Energy Info (EERE)

    50 Air Quality Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 50 Air...

  6. Quality Controlled Radiosonde Profile from MC3E (Dataset) | Data...

    Office of Scientific and Technical Information (OSTI)

    Title: Quality Controlled Radiosonde Profile from MC3E The sonde-adjust VAP produces data ... DOE Contract Number: DE-AC05-00OR22725 Resource Type: Dataset Data Type: Numeric Data ...

  7. EERE QC Workshop: Overview of Quality Control Techniques

    Broader source: Energy.gov [DOE]

    Overview of quality control techniques by Michael Ulsh, National Renewable Energy Laboratory, at the EERE QC Workshop held December 9-10, 2013, at the National Renewable Energy Laboratory in Golden, Colorado.

  8. EERE Quality Control Workshop Final Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report EERE Quality Control Workshop Final Report Proceedings from the DOE Office of Energy Efficiency and Renewable Energy (EERE) Quality Control Workshop held December 9-10, 2013, in Golden, Colorado. The workshop was co-sponsored by the EERE Fuel Cell Technologies Office, Solar Energy Technologies Office, Vehicle Technologies Office, Building Technologies Office, and Advanced Manufacturing Office, in support of the DOE Clean Energy Manufacturing Initiative. This report summarizes the

  9. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  10. Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure

    SciTech Connect (OSTI)

    ZAKRAJSEK, M.F.

    2000-10-17

    The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  19. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  20. ARM - Evaluation Product - Quality Controlled Eddy Correlation Flux

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (QCECOR) ProductsQuality Controlled Eddy Correlation Flux (QCECOR) ARM Data Discovery Browse Data Documentation Use the Data File Inventory tool to view data availability at the file level. Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Evaluation Product : Quality Controlled Eddy Correlation Flux (QCECOR) Eddy correlation flux measurement systems (ECOR) are used by ARM to provide surface turbulence flux measurements. With the help of the

  1. GenePRIMP: A software quality control tool

    SciTech Connect (OSTI)

    Amrita Pati

    2010-05-05

    Amrita Pati of the DOE Joint Genome Institute's Genome Biology group describes the software tool GenePRIMP and how it fits into the quality control pipeline for microbial genomics. Further details regarding GenePRIMP appear in a paper published online May 2, 2010 in Nature Methods.

  2. GenePRIMP: A software quality control tool

    ScienceCinema (OSTI)

    Amrita Pati

    2010-09-01

    Amrita Pati of the DOE Joint Genome Institute's Genome Biology group describes the software tool GenePRIMP and how it fits into the quality control pipeline for microbial genomics. Further details regarding GenePRIMP appear in a paper published online May 2, 2010 in Nature Methods.

  3. How to Create a Quality Control Checklist using the SWS Online...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Create a Quality Control Checklist using the SWS Online Tool How to Create a Quality Control Checklist using the SWS Online Tool This document explains How to Create a Quality ...

  4. Quality assurance and quality control for the compact physics research facility (CPRF) and ZTH experiment

    SciTech Connect (OSTI)

    Kewish, R.W. Jr.

    1989-01-01

    In compliance with DOE Order 5700.6B, which establishes policies to assure quality achievement in DOE programs, we instituted a quality assurance and quality control program whose primary goal is to assure that reliable components are available with which to assemble the CPRF/ZTH experiment. The Code of Federal Regulations 10 CFR 50, appendix B, and the ANSI standard N45.2 were used as a primary source of guidance in establishing a plan for our QA program. Accepted codes, such as the National Electric Code (NEC), and standards adopted by organizations such as ANSI, IEEE, ASME, and NEMA were used in the design and production of components in keeping with the primary goal of the CPRF program. In setting up the CPRF/ZTH quality assurance program it was our intention to have these standards apply to all suppliers, both within and outside the Laboratory. 5 refs., 6 figs.

  5. Quality assurance/quality control summary report for Phase 1 of the Clinch River remedial investigation. Environmental Restoration Program

    SciTech Connect (OSTI)

    Holladay, S.K.; Bevelhimer, M.S.; Brandt, C.C.

    1994-07-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants released from the US Department of Energy Oak Ridge Reservation and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. Phase 1 of the CRRI was a preliminary study in selected areas of the Clinch River/Watts Bar Reservoir. Fish, sediment, and water samples were collected and analyzed for inorganic, organic, and radiological parameters. Phase 1 was designed to (1) obtain high-quality data to confirm existing historical data for contaminant levels; (2) determine the range of contaminant concentrations present in the river-reservoir system; (3) identify specific contaminants of concern; and (4) establish the reference (background) concentrations for those contaminants. Quality assurance (QA) objectives for Phase I were that (1) scientific data generated would withstand scientific scrutiny; (2) data would be gathered using appropriate procedures for field sampling, chain-of-custody, laboratory analyses, and data reporting; and (3) data would be of known precision and accuracy. These objectives were met through the development and implementation of (1) a QA oversight program of audits and surveillances; (2) standard operating procedures accompanied by a training program; (3) field sampling and analytical laboratory quality control requirements; (4) data and records management systems; and (5) validation of the data by an independent reviewer. Approximately 1700 inorganic samples, 1500 organic samples, and 2200 radiological samples were analyzed and validated. The QA completeness objective for the project was to obtain valid analytical results for at least 95% of the samples collected.

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  8. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  9. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  10. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect (OSTI)

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  12. Development and application of procedures to evaluate air quality and visibility impacts of low-altitude flying operations

    SciTech Connect (OSTI)

    Liebsch, E.J.

    1990-08-01

    This report describes the development and application of procedures to evaluate the effects of low-altitude aircraft flights on air quality and visibility. The work summarized in this report was undertaken as part of the larger task of assessing the various potential environmental impacts associated with low-altitude military airspaces. Accomplishing the air quality/visibility analysis for the GEIS included (1) development and application of an integrated air quality model and aircraft emissions database specifically for Military Training Route (MTR) or similar flight operations, (2) selection and application of an existing air quality model to analyze the more widespread and less concentrated aircraft emissions from military Operations Areas (MOAs) and Restricted Areas (RAs), and (3) development and application of procedures to assess impacts of aircraft emissions on visibility. Existing air quality models were considered to be inadequate for predicting ground-level concentrations of pollutants emitted by aircraft along MTRs; therefore, the Single-Aircraft Instantaneous Line Source (SAILS) and Multiple-Aircraft Instantaneous Line Source (MAILS) models were developed to estimate potential impacts along MTRs. Furthermore, a protocol was developed and then applied in the field to determine the degree of visibility impairment caused by aircraft engine exhaust plumes. 19 refs., 2 figs., 3 tabs.

  13. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    SciTech Connect (OSTI)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements.

  14. X-ray Spectroscopy for Quality Control of Chemotherapy Drugs

    SciTech Connect (OSTI)

    Greaves, E. D.; Barros, H.; Bermudez, J.; Sajo-Bohus, L.; Angeli-Greaves, M.

    2007-10-26

    We develop a method, employing Compton peak standardization and the use of matrix-matched spiked samples with Total Reflection X-ray Fluorescence (TXRF), for the determination of platinum plasma concentrations of patients undergoing chemotherapy with Pt-bearing drugs. Direct blood plasma analysis attains Pt detection limits of 70 ng/ml. Measurement results of prescribed drug doses are compared to achieved blood Pt concentrations indicating a lack of expected correlations. Direct analysis of Pt-containing infused drugs from a variety of suppliers indicates cases of abnormal concentrations which raises quality control issues. We demonstrate the potential usefulness of the method for pharmacokinetic studies or for routine optimization and quality control of Pt chemotherapy treatments.

  15. File:Colorado Water Quality Control Act.pdf | Open Energy Information

    Open Energy Info (EERE)

    Colorado Water Quality Control Act.pdf Jump to: navigation, search File File history File usage Metadata File:Colorado Water Quality Control Act.pdf Size of this preview: 463 ...

  16. ARS Title 49-200 Water Quality Control | Open Energy Information

    Open Energy Info (EERE)

    -200 Water Quality Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: ARS Title 49-200 Water Quality ControlLegal Abstract...

  17. Quality Control Inspector 2.0: Purpose of Monitoring and Inspecting |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2.0: Purpose of Monitoring and Inspecting Quality Control Inspector 2.0: Purpose of Monitoring and Inspecting Purpose of Monitoring and Inspecting - Complete (20.91 MB) Lesson Plan: Purpose of Monitoring and Inspecting (299.15 KB) PowerPoint: Purpose of Monitoring and Inspecting (20.68 MB) More Documents & Publications Quality Control Inspector 2.0: Regulations and Standards Quality Control Inspector 2.0: Introduction to Weatherization for Quality Control Inspectors

  18. REVIEW Of COMPUTERIZED PROCEDURE GUIDELINES FOR NUCLEAR POWER PLANT CONTROL ROOMS

    SciTech Connect (OSTI)

    David I Gertman; Katya Le Blanc; Ronald L Boring

    2011-09-01

    Computerized procedures (CPs) are recognized as an emerging alternative to paper-based procedures for supporting control room operators in nuclear power plants undergoing life extension and in the concept of operations for advanced reactor designs. CPs potentially reduce operator workload, yield increases in efficiency, and provide for greater resilience. Yet, CPs may also adversely impact human and plant performance if not designed and implemented properly. Therefore, it is important to ensure that existing guidance is sufficient to provide for proper implementation and monitoring of CPs. In this paper, human performance issues were identified based on a review of the behavioral science literature, research on computerized procedures in nuclear and other industries, and a review of industry experience with CPs. The review of human performance issues led to the identification of a number of technical gaps in available guidance sources. To address some of the gaps, we developed 13 supplemental guidelines to support design and safety. This paper presents these guidelines and the case for further research.

  19. Hybrid Wall Construction and Quality Control Issues in Wyandotte, Michigan

    SciTech Connect (OSTI)

    Lukachko, A.; Grin, A.; Bergey, D.

    2013-12-01

    This report is the second report on the Wyandotte Neighborhood Stabilization Program 2 project in Wyandotte, MI, and documents refinements to the design, construction, and quality control for the high R-value enclosure. The report will be of interest to designers and builders of production housing in Cold Climates. The focus of the second round of research was on using the hybrid insulation approach to develop a reliable method of achieving consistently low airtightness numbers. There are two primary outcomes from this research. First, the airtightness measurements demonstrate that with a shallow learning curve, even new builders entering the program having little experience with the technology package are able to achieve consistent results that are less than 1.5 ACH50. Second, the process changes implemented to help secure these results were straightforward and ended up encouraging better communication between designer, builder, and the city officials supervising the project.

  20. Hybrid Wall Construction and Quality Control Issues in Wyandotte, Michigan

    SciTech Connect (OSTI)

    Lukachko, A.; Grin, A.; Bergey, D.

    2013-12-01

    This report is the second report on the Wyandotte NSP2 project in Wyandotte, MI and documents refinements to the design, construction, and quality control for the High R-value enclosure. The report will be of interest to designers and builders of production housing in Cold Climates. The focus of the second round of research was on using the hybrid insulation approach to develop a reliable methodof achieving consistently low airtightness numbers. There are two primary outcomes from this research. First, the airtightness measurements demonstrate that with a shallow learning curve, even new builders entering the program having little experience with the technology package are able to achieve consistent results that are less than 1.5 ACH50. Second, the process changes implemented to helpsecure these results were straightforward and ended up encouraging better communication between designer, builder, and the City officials supervising the project.

  1. New process modeling [sic], design, and control strategies for energy efficiency, high product quality, and improved productivity in the process industries. Final project report

    SciTech Connect (OSTI)

    Ray, W. Harmon

    2002-06-05

    This project was concerned with the development of process design and control strategies for improving energy efficiency, product quality, and productivity in the process industries. In particular, (i) the resilient design and control of chemical reactors, and (ii) the operation of complex processing systems, was investigated. Specific topics studied included new process modeling procedures, nonlinear controller designs, and control strategies for multiunit integrated processes. Both fundamental and immediately applicable results were obtained. The new design and operation results from this project were incorporated into computer-aided design software and disseminated to industry. The principles and design procedures have found their way into industrial practice.

  2. Coal quality control in the context of international standards ISO 9000-2000

    SciTech Connect (OSTI)

    Freidina, E.V.; Botvinnik, A.A.; Dvornikova, A.N.

    2008-11-15

    The paper sets forth scientific foundations and organizational-technical environment offered by ISO 9000 standards that are oriented to product quality management and, thus, product quality planning. The authors describe the results of coal product quality planning with using the QFD methodology, present a model of coal quality control through the coal product life cycle and mining technologies. It is proposed to evaluate the quality management efficiency by the coefficient of concordance between the product quality and consumer's demands.

  3. Implementation of a TMP Advanced Quality Control System at a Newsprint Manufacturing Plant

    SciTech Connect (OSTI)

    Sebastien Kidd

    2006-02-14

    This project provided for the implementation of an advanced, model predictive multi-variant controller that works with the mill that has existing distributed control system. The method provides real time and online predictive models and modifies control actions to maximize quality and minimize energy costs. Using software sensors, the system can predict difficult-to-measure quality and process variables and make necessary process control decisions to accurately control pulp quality while minimizing electrical usage. This method of control has allowed Augusta Newsprint Company to optimize the operation of its Thermo Mechanical Pulp mill for lower energy consumption and lower pulp quality variance.

  4. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect (OSTI)

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  5. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    SciTech Connect (OSTI)

    Seamans, J.A.

    1995-06-08

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

  6. Quality Assurance Manual

    SciTech Connect (OSTI)

    McGarrah, J.E.

    1995-05-01

    In order to provide clients with quality products and services, Pacific Northwest Laboratory (PNL) has established and implemented a formal quality assurance program. These management controls are documented in this manual (PNL-MA-70) and its accompanying standards and procedures. The QA Program meets the basic requirements and supplements of ANSI/ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities, as interpreted for PNL activities. Additional, the quality requirements are augmented to include the Total Quality approach defined in the Department of Energy Order 5700.6C, Quality Assurance. This manual provides requirements and an overview of the administrative procedures that apply to projects and activities.

  7. SU-E-CAMPUS-J-01: TG142 Complied Comprehensive Commissioning and Quality Assurance Procedure for Respiratory Gating

    SciTech Connect (OSTI)

    Woods, K; Rong, Y; Weldon, M; Gupta, N

    2014-06-15

    Purpose: To develop and establish a comprehensive gating commissioning and quality assurance procedure in compliance with TG142. Methods: Quality assurance tests on three Varian LINACs included beam output and energy constancy, calibration of surrogate, as well as phase and amplitude gating temporal accuracy. A diode array (MapCHECK 2) and film (Gafchromic EBT2) were used to measure the temporal accuracy of phase and amplitude gating windows. A motion simulation device (MotionSim) was used to simulate respiratory motion for both detectors. An end-to-end test was also performed on all three machines. The overall accuracy and uncertainty was analyzed and compared. Results: The end-to-end test using an anthropomorphic lung phantom (CIRS) results in an OSL dose difference reading within 5% (within measurement uncertainty) for both phase and amplitude gated treatment. Film results showed < 1% agreement between profiles for gated delivery and predicted dose. The diode array demonstrated an 80% passing rate for gamma criteria of 2%/0.2 mm, which results in a 111 msec temporal accuracy. However, the diode array is limited by its spatial resolution of measurements, due to its 7.07 mm diode spacing. Film provided higher measuring resolution, thus demonstrated a temporal accuracy of <100 msec. Conclusion: Results showed consistent respiratory gating stability and accuracy. MapCHECK 2 may not be sufficient for the temporal accuracy test in the respiratory gating treatment in order to meet the corresponding tolerance in TG142. One would need to decrease respiratory motion speed from the surrogate or tighten the gating window in order to be within tolerance of 100 msec temporal accuracy per TG-142. The end-to-end test offers insight to the overall accuracy and uncertainties with a gated protocol. Compared to static delivery, respiratory motion increases the overall uncertainty of treatment delivery from 3% to 5% dose difference.

  8. Multileaf collimator performance monitoring and improvement using semiautomated quality control testing and statistical process control

    SciTech Connect (OSTI)

    Ltourneau, Daniel McNiven, Andrea; Keller, Harald; Wang, An; Amin, Md Nurul; Pearce, Jim; Norrlinger, Bernhard; Jaffray, David A.

    2014-12-15

    Purpose: High-quality radiation therapy using highly conformal dose distributions and image-guided techniques requires optimum machine delivery performance. In this work, a monitoring system for multileaf collimator (MLC) performance, integrating semiautomated MLC quality control (QC) tests and statistical process control tools, was developed. The MLC performance monitoring system was used for almost a year on two commercially available MLC models. Control charts were used to establish MLC performance and assess test frequency required to achieve a given level of performance. MLC-related interlocks and servicing events were recorded during the monitoring period and were investigated as indicators of MLC performance variations. Methods: The QC test developed as part of the MLC performance monitoring system uses 2D megavoltage images (acquired using an electronic portal imaging device) of 23 fields to determine the location of the leaves with respect to the radiation isocenter. The precision of the MLC performance monitoring QC test and the MLC itself was assessed by detecting the MLC leaf positions on 127 megavoltage images of a static field. After initial calibration, the MLC performance monitoring QC test was performed 34 times/week over a period of 1011 months to monitor positional accuracy of individual leaves for two different MLC models. Analysis of test results was performed using individuals control charts per leaf with control limits computed based on the measurements as well as two sets of specifications of 0.5 and 1 mm. Out-of-specification and out-of-control leaves were automatically flagged by the monitoring system and reviewed monthly by physicists. MLC-related interlocks reported by the linear accelerator and servicing events were recorded to help identify potential causes of nonrandom MLC leaf positioning variations. Results: The precision of the MLC performance monitoring QC test and the MLC itself was within 0.22 mm for most MLC leaves and the

  9. Multifamily Quality Control Inspector Job/Task Analysis and Report: September 2013

    SciTech Connect (OSTI)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Quality Control Inspector JTA identifies and catalogs all of the tasks performed by multifamily quality control inspectors, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  10. The MAP3S network data and quality control summary for 1985

    SciTech Connect (OSTI)

    Dana, M.T.

    1988-02-01

    This report, the ninth in a series documenting results from the MAP3S Precipitation Chemistry Network, contains a statistical summary of daily precipitation chemistry data from the nine-site network in the eastern United States, both for the year 1985 alone and for the period 1977 through 1985. In addition, a report on quality control and external quality assurance activities is included, which updates the 1980 quality control report.

  11. Indoor air quality & airborne disease control in healthcare facilities...

    Office of Scientific and Technical Information (OSTI)

    Subject: 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; MEDICAL ESTABLISHMENTS; INDOOR AIR POLLUTION; CONTROL SYSTEMS; DISEASES; THERMAL COMFORT; SPACE HVAC SYSTEMS Word ...

  12. 30 TAC, part 1, chapter 116, rule 116.136 Public Comment Procedures...

    Open Energy Info (EERE)

    This rule explains the public comment procedures for new source review permits for air quality control in Texas. Published NA Year Signed or Took Effect 1993 Legal Citation...

  13. High-sensitive interferometric control of the quality of diffractive elements

    SciTech Connect (OSTI)

    Lyalikov, A M

    2011-01-24

    The prospects of the long lateral shear interferometry for controlling the quality of diffractive elements are shown. In this case, use is made of two diffractive elements, one of which is under investigation, and the other is the model one. A universal device is proposed to control the quality of the diffractive elements of both transmission and reflection types. We present the results of experimental realisation of the technique for the quality control of production of two-dimensional amplitude masks and reflection diffraction gratings. (interferometry)

  14. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  15. Conduct of Engineering and Technical Support Procedure Manual | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Conduct of Engineering and Technical Support Procedure Manual Conduct of Engineering and Technical Support Procedure Manual This procedure defines a standard approach for the control of software and firmware that is not exempt per Manual 1Q, Procedure 20-1, Software Quality Assurance. The software functional classification is based on the intended use of the software and the impact of the results/output on safety, security, and business risk. The provisions of this procedure apply

  16. Software quality assurance plan for the National Ignition Facility integrated computer control system

    SciTech Connect (OSTI)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project`s controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy`s (DOE`s) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project.

  17. NMS 74-6-4 Duties and Powers of the Water Quality Control Commission...

    Open Energy Info (EERE)

    -4 Duties and Powers of the Water Quality Control Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NMS 74-6-4 Duties...

  18. ETA-HIQA01 - Audit of the Quality Assurance Program for the Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST ... 6 8.5 Laboratory Records 7 8.6 CalibrationTest Report Preparation 7 8.7 Personnel 9 9.0 ...

  19. ETA-NQA001 - Audit of the Quality Assurance Program for the Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST ... 6 8.5 Laboratory Records 7 8.6 CalibrationTest Report Preparation 7 8.7 Personnel 9 9.0 ...

  20. ETA-HQA01 - Audit of the Quality Assurance Program for the Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST ... 6 8.5 Laboratory Records 7 8.6 CalibrationTest Report Preparation 7 8.7 Personnel 9 9.0 ...

  1. Audit of the Quality Assurance Program for the Control and Use...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST ... 7 8.5 Laboratory Records 8 8.6 CalibrationTest Report Preparation 8 8.7 Personnel 9 9.0 ...

  2. Ecotoxicity of sediments in stormwater quality control facilities

    SciTech Connect (OSTI)

    Anderson, B.C.; Loon, G. van; Watt, W.E.; Marsalek, J.

    1999-07-01

    The characteristics of accumulated sediments were investigated, with a focus on selected trace metals, in three stormwater management facilities and one natural site, all located in the Regional Municipality of Ottawa-Carleton, in Ontario, Canada. This study was conducted in response to concerns expressed by Environment Canada about possible ecosystem impacts by contaminants accumulated in these commonly applied, passive treatment systems. Also of interest were the effects of facility configuration, and operation and maintenance on particulate deposition patterns and resulting exposure risk. This was the first phase of a multidisciplinary study to quantify the risk of ecosystem effects in these systems, and results indicate that there are some significant potential risks present. In addition, results indicate that a simple comparison with provincial sediment quality guidelines may not be sufficient to alert facility owners and operators to these potential risks.

  3. Crowdsourcing quality control for Dark Energy Survey images

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Melchior, P.

    2016-07-01

    We have developed a crowdsourcing web application for image quality controlemployed by the Dark Energy Survey. Dubbed the "DES exposure checker", itrenders science-grade images directly to a web browser and allows users to markproblematic features from a set of predefined classes. Users can also generatecustom labels and thus help identify previously unknown problem classes. Userreports are fed back to hardware and software experts to help mitigate andeliminate recognized issues. We report on the implementation of the applicationand our experience with its over 100 users, the majority of which areprofessional or prospective astronomers but not data management experts. Wediscuss aspects ofmore » user training and engagement, and demonstrate how problemreports have been pivotal to rapidly correct artifacts which would likely havebeen too subtle or infrequent to be recognized otherwise. We conclude with anumber of important lessons learned, suggest possible improvements, andrecommend this collective exploratory approach for future astronomical surveysor other extensive data sets with a sufficiently large user base. We alsorelease open-source code of the web application and host an online demo versionat http://des-exp-checker.pmelchior.net« less

  4. Real-Time Control of Diesel Combustion Quality

    SciTech Connect (OSTI)

    Wagner, R.M.; Sisken, K

    2010-06-30

    Detroit Diesel Corporation (DDC) and ORNL established this CRADA to improve heavy-duty engine efficiency with reduced emissions at relatively extreme operating regimes such has high EGR, low-load, and cold-start, with an emphasis on the application of advanced control strategies. The approach used in this collaborative effort was to include the application of novel analysis and modeling techniques devel-oped from the application of nonlinear dynamics and chaos theory. More specifically, analytical tech-niques derived from these theories were to used to detect, characterize, and control the combustion insta-bilities that are responsible for poor combustion performance and corresponding high emissions. The foundation of this CRADA was established based on ORNL expertise on the fundamentals of ad-vanced combustion operation and experience with nonlinear dynamics and controls in combustion sys-tems. The initial plan was all data generation would be performed at DDC with an agreed upon experi-mental plan formed by both organizations. While numerous experiments were performed at DDC and the data was exchanged with ORNL researchers, the team decided to transfer an engine to ORNL to allow more flexibility and data generation opportunities. A prototype DDC Series 60 with a common rail fuel system was selected and installed at ORNL. DDC and ORNL maintained a strong collaboration throughout much of this project. Direct funding from DOE ended in 2004 and DDC continued to fund at a reduced amount through 2007. This CRADA has not been funded in more recent years but has been maintained active in anticipation of restored funding. This CRADA has led to additional collaborations between DDC and ORNL.

  5. Quality Assurance Specialist

    Broader source: Energy.gov [DOE]

    Alternate Title(s):Quality Control Technician; Quality Assurance Inspector; Quality Assurance Representative

  6. Requirements for quality control of analytical data for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Engels, J.

    1992-12-01

    The Environmental Restoration (ER) Program was established for the investigation and remediation of inactive US Department of Energy (DOE) sites and facilities that have been declared surplus in terms of their previous uses. The purpose of this document is to Specify ER requirements for quality control (QC) of analytical data. Activities throughout all phases of the investigation may affect the quality of the final data product, thus are subject to control specifications. Laboratory control is emphasized in this document, and field concerns will be addressed in a companion document Energy Systems, in its role of technical coordinator and at the request of DOE-OR, extends the application of these requirements to all participants in ER activities. Because every instance and concern may not be addressed in this document, participants are encouraged to discuss any questions with the ER Quality Assurance (QA) Office, the Analytical Environmental Support Group (AESG), or the Analytical Project Office (APO).

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  10. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  11. Office of Quality Management

    Broader source: Energy.gov [DOE]

    The Office of Quality Management develops and interprets Government-wide policies and procedures and conducts training to ensure the accurate identification of information and documents that must be classified or controlled under statute or Executive order to protect the national security and controlled unclassified Official Use Only information for the effective operation of the Government.

  12. Quality control for quantitative multicenter whole-body PET/MR studies: A NEMA image quality phantom study with three current PET/MR systems

    SciTech Connect (OSTI)

    Boellaard, Ronald; Rausch, Ivo; Beyer, Thomas; Delso, Gaspar; Yaqub, Maqsood; Quick, Harald H.; Sattler, Bernhard

    2015-10-15

    Purpose: Integrated positron emission tomography/magnetic resonance (PET/MR) systems derive the PET attenuation correction (AC) from dedicated MR sequences. While MR-AC performs reasonably well in clinical patient imaging, it may fail for phantom-based quality control (QC). The authors assess the applicability of different protocols for PET QC in multicenter PET/MR imaging. Methods: The National Electrical Manufacturers Association NU 2 2007 image quality phantom was imaged on three combined PET/MR systems: a Philips Ingenuity TF PET/MR, a Siemens Biograph mMR, and a GE SIGNA PET/MR (prototype) system. The phantom was filled according to the EANM FDG-PET/CT guideline 1.0 and scanned for 5 min over 1 bed. Two MR-AC imaging protocols were tested: standard clinical procedures and a dedicated protocol for phantom tests. Depending on the system, the dedicated phantom protocol employs a two-class (water and air) segmentation of the MR data or a CT-based template. Differences in attenuation- and SUV recovery coefficients (RC) are reported. PET/CT-based simulations were performed to simulate the various artifacts seen in the AC maps (μ-map) and their impact on the accuracy of phantom-based QC. Results: Clinical MR-AC protocols caused substantial errors and artifacts in the AC maps, resulting in underestimations of the reconstructed PET activity of up to 27%, depending on the PET/MR system. Using dedicated phantom MR-AC protocols, PET bias was reduced to −8%. Mean and max SUV RC met EARL multicenter PET performance specifications for most contrast objects, but only when using the dedicated phantom protocol. Simulations confirmed the bias in experimental data to be caused by incorrect AC maps resulting from the use of clinical MR-AC protocols. Conclusions: Phantom-based quality control of PET/MR systems in a multicenter, multivendor setting may be performed with sufficient accuracy, but only when dedicated phantom acquisition and processing protocols are used for

  13. Water Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Quality Water Quality We protect water quality through stormwater control measures and an extensive network of monitoring wells and stations encompassing groundwater, surface...

  14. Water Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Quality Water Quality We protect water quality through stormwater control measures and an extensive network of monitoring wells and stations encompassing groundwater, surface ...

  15. Quality of epitaxial InAs nanowires controlled by catalyst size in molecular beam epitaxy

    SciTech Connect (OSTI)

    Zhang, Zhi; Xu, Hong-Yi; Guo, Ya-Nan; Liao, Zhi-Ming; Lu, Zhen-Yu; Chen, Ping-Ping; Shi, Sui-Xing; Lu, Wei; Zou, Jin; Centre for Microscopy and Microanalysis, The University of Queensland, St. Lucia, Queensland 4072

    2013-08-12

    In this study, the structural quality of Au-catalyzed InAs nanowires grown by molecular beam epitaxy is investigated. Through detailed electron microscopy characterizations and analysis of binary Au-In phase diagram, it is found that defect-free InAs nanowires can be induced by smaller catalysts with a high In concentration, while comparatively larger catalysts containing less In induce defected InAs nanowires. This study indicates that the structural quality of InAs nanowires can be controlled by the size of Au catalysts when other growth conditions remain as constants.

  16. Rapid evaluation and quality control of next generation sequencing data with FaQCs

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Lo, Chien -Chi; Chain, Patrick S. G.

    2014-12-01

    Background: Next generation sequencing (NGS) technologies that parallelize the sequencing process and produce thousands to millions, or even hundreds of millions of sequences in a single sequencing run, have revolutionized genomic and genetic research. Because of the vagaries of any platform's sequencing chemistry, the experimental processing, machine failure, and so on, the quality of sequencing reads is never perfect, and often declines as the read is extended. These errors invariably affect downstream analysis/application and should therefore be identified early on to mitigate any unforeseen effects. Results: Here we present a novel FastQ Quality Control Software (FaQCs) that can rapidly processmore » large volumes of data, and which improves upon previous solutions to monitor the quality and remove poor quality data from sequencing runs. Both the speed of processing and the memory footprint of storing all required information have been optimized via algorithmic and parallel processing solutions. The trimmed output compared side-by-side with the original data is part of the automated PDF output. We show how this tool can help data analysis by providing a few examples, including an increased percentage of reads recruited to references, improved single nucleotide polymorphism identification as well as de novo sequence assembly metrics. Conclusion: FaQCs combines several features of currently available applications into a single, user-friendly process, and includes additional unique capabilities such as filtering the PhiX control sequences, conversion of FASTQ formats, and multi-threading. The original data and trimmed summaries are reported within a variety of graphics and reports, providing a simple way to do data quality control and assurance.« less

  17. Rapid evaluation and quality control of next generation sequencing data with FaQCs

    SciTech Connect (OSTI)

    Lo, Chien -Chi; Chain, Patrick S. G.

    2014-12-01

    Background: Next generation sequencing (NGS) technologies that parallelize the sequencing process and produce thousands to millions, or even hundreds of millions of sequences in a single sequencing run, have revolutionized genomic and genetic research. Because of the vagaries of any platform's sequencing chemistry, the experimental processing, machine failure, and so on, the quality of sequencing reads is never perfect, and often declines as the read is extended. These errors invariably affect downstream analysis/application and should therefore be identified early on to mitigate any unforeseen effects. Results: Here we present a novel FastQ Quality Control Software (FaQCs) that can rapidly process large volumes of data, and which improves upon previous solutions to monitor the quality and remove poor quality data from sequencing runs. Both the speed of processing and the memory footprint of storing all required information have been optimized via algorithmic and parallel processing solutions. The trimmed output compared side-by-side with the original data is part of the automated PDF output. We show how this tool can help data analysis by providing a few examples, including an increased percentage of reads recruited to references, improved single nucleotide polymorphism identification as well as de novo sequence assembly metrics. Conclusion: FaQCs combines several features of currently available applications into a single, user-friendly process, and includes additional unique capabilities such as filtering the PhiX control sequences, conversion of FASTQ formats, and multi-threading. The original data and trimmed summaries are reported within a variety of graphics and reports, providing a simple way to do data quality control and assurance.

  18. Photoluminescence-based quality control for thin film absorber layers of photovoltaic devices

    SciTech Connect (OSTI)

    Repins, Ingrid L.; Kuciauskas, Darius

    2015-07-07

    A time-resolved photoluminescence-based system providing quality control during manufacture of thin film absorber layers for photovoltaic devices. The system includes a laser generating excitation beams and an optical fiber with an end used both for directing each excitation beam onto a thin film absorber layer and for collecting photoluminescence from the absorber layer. The system includes a processor determining a quality control parameter such as minority carrier lifetime of the thin film absorber layer based on the collected photoluminescence. In some implementations, the laser is a low power, pulsed diode laser having photon energy at least great enough to excite electron hole pairs in the thin film absorber layer. The scattered light may be filterable from the collected photoluminescence, and the system may include a dichroic beam splitter and a filter that transmit the photoluminescence and remove scattered laser light prior to delivery to a photodetector and a digital oscilloscope.

  19. Procedures for ground-water investigations. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  20. ARM - Data Quality Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Program DQ Resources Data Quality Assessment and Control Report (PDF, 747KB) Data Quality Office Data Quality Problem Reporting (DQPR) Contact Us Submit Data Quality ...

  1. Pollutant Assessments Group Procedures Manual: Volume 1, Administrative and support procedures

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This manual describes procedures currently in use by the Pollutant Assessments Group. The manual is divided into two volumes: Volume 1 includes administrative and support procedures, and Volume 2 includes technical procedures. These procedures are revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy. Format inconsistencies will be corrected in subsequent revisions of individual procedures. The purpose of the Pollutant Assessments Groups Procedures Manual is to provide a standardized set of procedures documenting in an auditable manner the activities performed by the Pollutant Assessments Group (PAG) of the Health and Safety Research Division (HASRD) of the Environmental Measurements and Applications Section (EMAS) at Oak Ridge National Laboratory (ORNL). The Procedures Manual ensures that the organizational, administrative, and technical activities of PAG conform properly to protocol outlined by funding organizations. This manual also ensures that the techniques and procedures used by PAG and other contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards. The Procedures Manual is sufficiently comprehensive for use by PAG and contractor personnel in the planning, performance, and reporting of project activities and measurements. The Procedures Manual provides procedures for conducting field measurements and includes program planning, equipment operation, and quality assurance elements. Successive revisions of this manual will be archived in the PAG Document Control Department to facilitate tracking of the development of specific procedures.

  2. Computerized procedures system

    SciTech Connect (OSTI)

    Lipner, Melvin H.; Mundy, Roger A.; Franusich, Michael D.

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  3. Controlled low strength materials (CLSM), reported by ACI Committee...

    Office of Scientific and Technical Information (OSTI)

    This report contains information on applications, material properties, mix proportioning, construction and quality-control procedures. This reports intent is to provide basic ...

  4. SU-E-T-103: Development and Implementation of Web Based Quality Control Software

    SciTech Connect (OSTI)

    Studinski, R; Taylor, R; Angers, C; La Russa, D; Clark, B

    2014-06-01

    Purpose: Historically many radiation medicine programs have maintained their Quality Control (QC) test results in paper records or Microsoft Excel worksheets. Both these approaches represent significant logistical challenges, and are not predisposed to data review and approval. It has been our group's aim to develop and implement web based software designed not just to record and store QC data in a centralized database, but to provide scheduling and data review tools to help manage a radiation therapy clinics Equipment Quality control program. Methods: The software was written in the Python programming language using the Django web framework. In order to promote collaboration and validation from other centres the code was made open source and is freely available to the public via an online source code repository. The code was written to provide a common user interface for data entry, formalize the review and approval process, and offer automated data trending and process control analysis of test results. Results: As of February 2014, our installation of QAtrack+ has 180 tests defined in its database and has collected ∼22 000 test results, all of which have been reviewed and approved by a physicist via QATrack+'s review tools. These results include records for quality control of Elekta accelerators, CT simulators, our brachytherapy programme, TomoTherapy and Cyberknife units. Currently at least 5 other centres are known to be running QAtrack+ clinically, forming the start of an international user community. Conclusion: QAtrack+ has proven to be an effective tool for collecting radiation therapy QC data, allowing for rapid review and trending of data for a wide variety of treatment units. As free and open source software, all source code, documentation and a bug tracker are available to the public at https://bitbucket.org/tohccmedphys/qatrackplus/.

  5. Achieving dust lead clearance standards after lead hazard control projects: An evaluation of the HUD-recommended cleaning procedure and an abbreviated alternative

    SciTech Connect (OSTI)

    Dixon, S. ); Tohn, E. ); Rupp, R. ); Clark, S. . Dept. of Environmental Health)

    1999-05-01

    The US Department of Housing and Urban Development's (HUD's) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing strongly recommend that after lead hazard control interventions all walls, ceiling, floors, and other horizontal surfaces be cleaned using a three-step process to reduce lead-contaminated dust and debris. The three steps are: an initial vacuuming using a machine equipped with a high-efficiency particulate air (HEPA) filter (HEPA vacuum), wet wash with a lead cleaner, and a final HEPA vacuum. This study evaluated the effectiveness of two cleaning protocols: (1) the HUD-recommended three-step procedure, and (2) an abbreviated two-step cleaning procedure that omits the final HEPA vacuum. Cleaning procedures were evaluated in 27 dwelling units that had undergone significant lead hazard control interventions likely to produce lead dust. Dust lead samples were collected on floors and in window sills and troughs prior to the lead control hazard intervention, after the wet wash step of the cleaning procedure, and after completion of the second HEPA vacuuming. The results of the study demonstrate that dust lead surface loading on smooth and cleanable surfaces following the three-step and two-step cleaning procedures can achieve 1995 federal guidance dust clearance levels and levels substantially lower. Although the dust lead clearance rates before and after the second HEPA vacuum were the same, the time saved by omitting the second HEPA is small relative to the other elements of the cleaning process.

  6. Quality control circles: will they work at Sandia. Findings from a review of 66 sources

    SciTech Connect (OSTI)

    Jeys, G.H.

    1982-01-01

    Quality Control Circles (QCC's) meet regularly to solve limited, but important, problems related directly to their work. The QCC is organized so that the worker becomes involved in problem solving and quality awareness in meaningful and creative ways. Participation is voluntary. This concept has been successfully used in Japan for two decades. QCC's are now being implemented at an accelerating rate world-wide. There are questions as to QCC's applicability in the United States and in particular with respect to an R and D facility such as Sandia. This paper summarizes information about the QCC concept with respect to its implementation and applicability to Sandia. Information was extracted from 66 sources as noted in an Annotated Bibliography. Analysis techniques used by QCC's were utilized in the construction of this paper, especially with the Annotated Bibliography.

  7. Verification of simplified procedures for site-specific SO sub 2 and NOx control cost estimates. Final report, March 1988-May 1989

    SciTech Connect (OSTI)

    Emmel, T.E.; Maibodi, M.

    1990-02-01

    The report documents results of an evaluation to verify the accuracy of simplified procedures for estimating sulfur dioxide (SO2) and nitrogen oxides (NOx) retrofit control costs and performance for 200 SO2-emitting coal-fired power plants in the 31-state eastern region. Initially, detailed retrofit studies were conducted for 12 coal-fired plants in Ohio, Kentucky, and the Tennessee Valley Authority system. Because detailed studies are expensive and time-consuming, results from the 12-plant study were used to develop simplified procedures which require less time, data, and preparation effort. The evaluation compared the costs for a number of plants estimated using the simplified procedures to costs estimated using detailed procedures, actual retrofit costs, and more detailed cost estimates provided by utility companies. Based on the evaluation, recommendations for changes to the simplified procedures were developed. Control technologies addressed in the report are conventional lime/limestone flue gas desulfurization, lime spray drying, furnace sorbent injection, duct spray drying, coal switching, physical coal cleaning, and selective catalytic reduction. In general, it was found that the simplified procedures can be used to generate improved cost performance estimates based on generally available information.

  8. Method of controlling coherent synchroton radiation-driven degradation of beam quality during bunch length compression

    DOE Patents [OSTI]

    Douglas, David R.; Tennant, Christopher D.

    2012-07-10

    A method of avoiding CSR induced beam quality defects in free electron laser operation by a) controlling the rate of compression and b) using a novel means of integrating the compression with the remainder of the transport system: both are accomplished by means of dispersion modulation. A large dispersion is created in the penultimate dipole magnet of the compression region leading to rapid compression; this large dispersion is demagnified and dispersion suppression performed in a final small dipole. As a result, the bunch is short for only a small angular extent of the transport, and the resulting CSR excitation is small.

  9. Quality Control Inspector (QCI) Pre-Exam Quiz | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (QCI) Pre-Exam Quiz Quality Control Inspector (QCI) Pre-Exam Quiz This quiz is not representative of, nor related to the content of the actual QCI exam. While it is not an official indication as to whether or not someone can successfully pass the exam, it can be used as an assessment when deciding whether or not one is prepared to take the exam. This quiz was updated on 11/19/2014. QCI Pre-Exam Quiz (Updated 11/19/2014) (79.62 KB) More Documents & Publications 1703 Process Letter QER -

  10. Quality assurance plan for the High Level Controller for the CBMS Block II

    SciTech Connect (OSTI)

    Reid, R.W.; Robbins, I.F.; Stewart, K.A.; Terry, C.L.; Whitaker, R.A.; Wolf, D.A.; Zager, J.C.

    1997-09-01

    This document establishes the software Quality Assurance Plan (QAP) for the High Level Controller for the Chemical and Biological Mass Spectrometer Block II (HLC/CBMS-II) project activities under the Computing, Robotics, and Education (CRE) Directorate management. It defines the requirements and assigns responsibilities for ensuring, with a high degree of confidence, that project objectives will be achieved as planned. The CBMS Program was awarded to ORNL by the US Army Chemical and Biological Defense command, Aberdeen Proving Ground, Maryland, to design the next version (Block II) mass spectrometer for the detection and identification of chemical and biological warfare agents, to fabricate four engineering prototypes, and to construct eight preproduction units. Section 1 of this document provides an introduction to the HLC/CBMS-II project QAP. Sections 2 and 3 describe the specific aspects of quality assurance as applicable to the project. Section 4 reviews the project approach to risk management. The Risk Management Matrix given in Appendix A is a tool to assess, prioritize, and prevent problems before they occur; therefore, the matrix will be reviewed and revised on a periodic basis. Appendix B shows the quality assurance criteria of the DOE Order 5700.6C and their applicability to this project.

  11. Using a Ventilation Controller to Optimize Residential Passive Ventilation For Energy and Indoor Air Quality

    SciTech Connect (OSTI)

    Turner, William; Walker, Iain

    2014-08-01

    One way to reduce the energy impact of providing residential ventilation is to use passive and hybrid systems. However, these passive and hybrid (sometimes called mixed-mode) systems must still meet chronic and acute health standards for ventilation. This study uses a computer simulation approach to examine the energy and indoor air quality (IAQ) implications of passive and hybrid ventilation systems, in 16 California climate zones. Both uncontrolled and flow controlled passive stacks are assessed. A new hybrid ventilation system is outlined that uses an intelligent ventilation controller to minimise energy use, while ensuring chronic and acute IAQ standards are met. ASHRAE Standard 62.2-2010 – the United States standard for residential ventilation - is used as the chronic standard, and exposure limits for PM2.5, formaldehyde and NO2 are used as the acute standards.The results show that controlled passive ventilation and hybrid ventilation can be used in homes to provide equivalent IAQ to continuous mechanical ventilation, for less use of energy.

  12. Controllable high-quality electron beam generation by phase slippage effect in layered targets

    SciTech Connect (OSTI)

    Yu, Q.; Li, X. F.; Huang, S.; Zhang, F.; Kong, Q.; Gu, Y. J.; Ma, Y. Y.; Kawata, S.

    2014-11-15

    The bubble structure generated by laser-plasma interactions changes in size depending on the local plasma density. The self-injection electrons' position with respect to wakefield can be controlled by tailoring the longitudinal plasma density. A regime to enhance the energy of the wakefield accelerated electrons and to improve the beam quality is proposed and achieved using layered plasmas with increasing densities. Both the wakefield size and the electron bunch duration are significantly contracted in this regime. The electrons remain in the strong acceleration phase of the wakefield, while their energy spread decreases because of their tight spatial distribution. An electron beam of 0.5?GeV with less than 1% energy spread is obtained through 2.5D particle-in-cell simulations.

  13. Use of the topography of secondary electromagnetic fields in resonance electromagnetic-acoustic quality control

    SciTech Connect (OSTI)

    Shakshin, N.I.; Komarov, V.A.; Deordiev, G.I.; Bausov, S.I.

    1988-09-01

    The article examines methods of identifying resonances from normal elastic waves of lower modes in the low-frequency part of the spectrum of oscillations of rectangular ferromagnetic metal plates from experimental evaluations of the phase velocity of a normal wave by the data on the topography of the amplitude of an EMA signal at a fixed height above the plate or on quasistationary attenuation of this amplitude with increasing height. Their efficiency is demonstrated on plates of Armco iron, steel 40Kh, and nickel. It is shown that the modification of the method using data on the attenuation of the amplitude makes it possible to improve the reliability of quality control of heat treatment of steel plates by going over to a new informative parameter which is directly proportional to the phase velocity of a normal wave and does not depend on variation of the resonance dimensions.

  14. EERE Quality Control Workshop Final Report: Proceedings from the EERE Quality Control Workshop, in support of the DOE Clean Energy Manufacturing Initiative; Golden, Colorado, December 9-10, 2013

    SciTech Connect (OSTI)

    Not Available

    2014-05-01

    The U.S. Department of Energy Office of Energy Efficiency & Renewable Energy (EERE) has recognized the cross-cutting, pre-competitive and enabling nature of quality control for a wide range of clean energy technologies. As such, the Fuel Cell Technologies Office, Solar Energy Technologies Office, Vehicle Technologies Office, Building Technologies Office, and Advanced Manufacturing Office decided to explore needs and potential cross-office synergies in this area by holding the EERE Quality Control Workshop, in support of the DOE Clean Energy Manufacturing Initiative. This report summarizes the purpose and scope of the workshop; reviews the current status and state-of-the-art for in-line quality control; summarizes the results from three breakout sessions; and presents conclusions and recommendations.

  15. Better Buildings Residential Network Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations, March 27, 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations March 27, 2014 Agenda 2  Call Logistics and Introductions  BBRN and Peer Exchange Call Overview  Featured Speakers - QA/QC Approaches & Lessons Learned  Dan Wildenhaus -Technical and QC Lead for Seattle's Community Power Works Program and Senior Building Scientist at CLEAResult  Brian Atchinson - Associate Project Manager, Quality, Standards and Compliance, New York

  16. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    SciTech Connect (OSTI)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports.

  17. Report on the audit of the Savannah River Site`s quality control program for groundwater sampling

    SciTech Connect (OSTI)

    1997-05-20

    The Savannah River Site`s groundwater remediation program was managed by the Department of Energy`s (Department) management and operating contractor for the site, Westinghouse Savannah River Company (Westinghouse). One component of the remediation program was the quality control program. The goal of the groundwater quality control program was to ensure that the results of laboratory analyses of groundwater samples were accurate and precise so that they could be relied upon for making remediation decisions. The objective of this audit was to determine whether Westinghouse acquired the minimal number of laboratory analyses required to ensure that groundwater sampling results met this criteria.

  18. PROTEIN QUALITY CONTROL IN BACTERIAL CELLS: INTEGRATED NETWORKS OF CHAPERONES AND ATP-DEPENDENT PROTEASES.

    SciTech Connect (OSTI)

    FLANAGAN,J.M.BEWLEY,M.C.

    2002-10-01

    aggregation and/or mislfolding. Thus it is not surprising that, in cells, the protein folding process is error prone and organisms have evolved ''editing'' or quality control (QC) systems to assist in the folding, maintenance and, when necessary, selective removal of damaged proteins. In fact, there is growing evidence that failure of these QC-systems contributes to a number of disease states (5-8). This chapter describes our current understanding of the nature and mechanisms of the protein quality control systems in the cytosol of bacteria. Parallel systems are exploited in the cytosol and mitochondria of eukaryotes to prevent the accumulation of misfolded proteins.

  19. PROTEIN QUALITY CONTROL IN BACTERIAL CELLS: INTEGRATED NETWORKS OF CHAPERONES AND ATP-DEPENDENT PROTEASES.

    SciTech Connect (OSTI)

    FLANAGAN,J.M.; BEWLEY,M.C.

    2001-12-03

    /or misfolding. Thus it is not surprising that, in cells, the protein folding process is error prone and organisms have evolved ''editing'' or quality control (QC) systems to assist in the folding, maintenance and, when necessary, selective removal of damaged proteins. In fact, there is growing evidence that failure of these QC-systems contributes to a number of disease states (5-8). This chapter describes our current understanding of the nature and mechanisms of the protein quality control systems in the cytosol of bacteria. Parallel systems are exploited in the cytosol and mitochondria of eukaryotes to prevent the accumulation of misfolded proteins.

  20. Emergency Procedures

    Broader source: Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  1. CONTROLLED DOCUMENT OFFICE OF PRIMARY INTEREST (OPI): AVAILABLE ON-LINE AT: Weapon Quality Division

    National Nuclear Security Administration (NNSA)

    ON-LINE AT: Weapon Quality Division http://www.nnsa.energy.gov printed copies are uncontrolled NNSA POLICY LETTER Approved: 11-24-15 WEAPON QUALITY POLICY NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of Defense Programs NAP-24A THIS PAGE INTENTIONALLY LEFT BLANK NAP-24A 1 11-24-15 WEAPON QUALITY POLICY 1. PURPOSE. The purpose of this document, NAP-24A, Weapon Quality Policy, is to identify the quality requirements applicable to weapon activities of the NNSA Federal personnel, contractors and

  2. Results of The Excreta Bioassay Quality Control Program For April 1, 2010 Through March 31, 2011

    SciTech Connect (OSTI)

    Antonio, Cheryl L.

    2012-07-19

    A total of 76 urine samples and 10 spiked fecal samples were submitted during the report period (April 1, 2010 through March 31, 2011) to GEL Laboratories, LLC in South Carolina by the Hanford Internal Dosimetry Program (IDP) to check the accuracy, precision, and detection levels of their analyses. Urine analyses for 14C, Sr, for 238Pu, 239Pu, 241Am, 243Am, 235U, 238U, 238U-mass and fecal analyses for 241Am, 238Pu and 239Pu were tested this year. The number of QC urine samples submitted during the report period represented 1.1% of the total samples submitted. In addition to the samples provided by IDP, GEL was also required to conduct their own QC program, and submit the results of analyses to IDP. About 31% of the analyses processed by GEL during the first year of contract 112512 were quality control samples. GEL tested the performance of 23 radioisotopes, all of which met or exceeded the specifications in the Statement of Work within statistical uncertainty except the slightly elevated relative bias for 243,244Cm (Table 4).

  3. Results of the Excreta Bioassay Quality Control Program for April 1, 2009 through March 31, 2010

    SciTech Connect (OSTI)

    Antonio, Cheryl L.

    2012-07-19

    A total of 58 urine samples and 10 fecal samples were submitted during the report period (April 1, 2009 through March 31, 2010) to General Engineering Laboratories, South Carolina by the Hanford Internal Dosimetry Program (IDP) to check the accuracy, precision, and detection levels of their analyses. Urine analyses for Sr, 238Pu, 239Pu, 241Am, 243Am 235U, 238U, elemental uranium and fecal analyses for 241Am, 238Pu and 239Pu were tested this year as well as four tissue samples for 238Pu, 239Pu, 241Am and 241Pu. The number of QC urine samples submitted during the report period represented 1.3% of the total samples submitted. In addition to the samples provided by IDP, GEL was also required to conduct their own QC program, and submit the results of analyses to IDP. About 33% of the analyses processed by GEL during the third year of this contract were quality control samples. GEL tested the performance of 21 radioisotopes, all of which met or exceeded the specifications in the Statement of Work within statistical uncertainty (Table 4).

  4. Millimeter-Wave Absorption as a Quality Control Tool for M-Type Hexaferrite Nanopowders

    SciTech Connect (OSTI)

    McCloy, John S.; Korolev, Konstantin A.; Crum, Jarrod V.; Afsar, Mohammed N.

    2013-01-01

    Millimeter wave (MMW) absorption measurements have been conducted on commercial samples of large (micrometer-sized) and small (nanometer-sized) particles of BaFe12O19 and SrFe12O19 using a quasi-optical MMW spectrometer and a series of backwards wave oscillators encompassing the 30-120 GHz range. Effective anisotropy of the particles calculated from the resonant absorption frequency indicates lower overall anisotropy in the nano-particles. Due to their high magnetocrystalline anisotropy, both BaFe12O19 and SrFe12O19 are expected to have spin resonances in the 45-55 GHz range. Several of the sampled BaFe12O19 powders did not have MMW absorptions, so they were further investigated by DC magnetization and x-ray diffraction to assess magnetic behavior and structure. The samples with absent MMW absorption contained primarily iron oxides, suggesting that MMW absorption could be used for quality control in hexaferrite powder manufacture.

  5. Data Quality Assessment and Control for the ARM Climate Research Facility

    SciTech Connect (OSTI)

    Peppler, R

    2012-06-26

    The mission of the Atmospheric Radiation Measurement (ARM) Climate Research Facility is to provide observations of the earth climate system to the climate research community for the purpose of improving the understanding and representation, in climate and earth system models, of clouds and aerosols as well as their coupling with the Earth's surface. In order for ARM measurements to be useful toward this goal, it is important that the measurements are of a known and reasonable quality. The ARM data quality program includes several components designed to identify quality issues in near-real-time, track problems to solutions, assess more subtle long-term issues, and communicate problems to the user community.

  6. New Mexico Antidegradation Policy Implementation Procedure |...

    Open Energy Info (EERE)

    the Antidegradation Policy in NMAC 20.6.4.8. Author New Mexico Water Quality Control Commission Published New Mexico Water Quality Control Commission, 2010 DOI Not...

  7. Reduction of ahead of schedule anodes through anode rod quality control

    SciTech Connect (OSTI)

    Baillargeon, F.; Menard, Y.; Perron, C.; Proulx, A.L.

    1996-10-01

    One of the major causes of ahead of schedule anodes reported in recent years by the P155 potroom operation was related to the inherent weakness in the rod welded joints. The development and implementation of an apparatus and procedure to measure, detect and reject the faulty rods prior to anode rodding, will be presented and discussed. The technology has not only significantly reduced the number of ahead of schedule anodes, it has also provided useful information concerning other process improvements.

  8. Apparatus and procedure to characterize the surface quality of conductors by measuring the rate of cathode emission as a function of surface electric field strength

    DOE Patents [OSTI]

    Mestayer, Mac; Christo, Steve; Taylor, Mark

    2014-10-21

    A device and method for characterizing quality of a conducting surface. The device including a gaseous ionizing chamber having centrally located inside the chamber a conducting sample to be tested to which a negative potential is applied, a plurality of anode or "sense" wires spaced regularly about the central test wire, a plurality of "field wires" at a negative potential are spaced regularly around the sense, and a plurality of "guard wires" at a positive potential are spaced regularly around the field wires in the chamber. The method utilizing the device to measure emission currents from the conductor.

  9. The MAP3S Precipitation Chemistry Network: Data and quality control summary for 1986 and 1987

    SciTech Connect (OSTI)

    Dana, M.T.; Barchet, W.R.

    1989-05-01

    This report, the tenth in a series documenting results from the MAP3S Precipitation Chemistry Network, contains a statistical summary of daily precipitation chemistry data from the nine-site network in the eastern United States, both for the years 1986 and 1987 individually and for the period 1977 through 1987. In addition, external quality assurance results for 1986 and 1987 are summarized. 17 refs., 21 figs., 20 tabs.

  10. A research study to determine the effect of Total Quality Management (TQM) on employee morale in Plant Procedures Division at EG&G, Rocky Flats, Inc.

    SciTech Connect (OSTI)

    Casey, E.F.

    1994-01-01

    EG&G at Rocky Flats, Golden, Colorado, experienced a high amount of low morale, due to the plant site having been designated to close, and the uneasiness of the working force was very visible. Some employees accepted early retirement in October 1992, however, all received letters of 120 days notice in March 1993, and were advised several cuts Would be made by October 1, 1993. This information alone caused many insecurities in employees, and caused morale to decrease even more. This is an in depth study of morale, which was upgraded in Plant Procedures Group (PPG), through the effect of TQM. The primary research included a survey of employees with results included. The study also increased additional questions in PPG, some of which were added to the agenda of the Process Improvement Team (PIT) to improve PPG in the eyes of customers. Statistics did show that morale improved, not necessarily because of TQM or the progress of the Process Improvement Team (PIT), but due to efforts of the staff implementing the principles of TQM the best they knew how.

  11. Balancing energy conservation and occupant needs in ventilation rate standards for Big Box stores and other commercial buildings in California. Issues related to the ASHRAE 62.1 Indoor Air Quality Procedure

    SciTech Connect (OSTI)

    Mendell, Mark J.; Apte, Mike G.

    2010-10-31

    This report considers the question of whether the California Energy Commission should incorporate the ASHRAE 62.1 ventilation standard into the Title 24 ventilation rate (VR) standards, thus allowing buildings to follow the Indoor Air Quality Procedure. This, in contrast to the current prescriptive standard, allows the option of using ventilation rate as one of several strategies, which might include source reduction and air cleaning, to meet specified targets of indoor air concentrations and occupant acceptability. The research findings reviewed in this report suggest that a revised approach to a ventilation standard for commercial buildings is necessary, because the current prescriptive ASHRAE 62.1 Ventilation Rate Procedure (VRP) apparently does not provide occupants with either sufficiently acceptable or sufficiently healthprotective air quality. One possible solution would be a dramatic increase in the minimum ventilation rates (VRs) prescribed by a VRP. This solution, however, is not feasible for at least three reasons: the current need to reduce energy use rather than increase it further, the problem of polluted outdoor air in many cities, and the apparent limited ability of increasing VRs to reduce all indoor airborne contaminants of concern (per Hodgson (2003)). Any feasible solution is thus likely to include methods of pollutant reduction other than increased outdoor air ventilation; e.g., source reduction or air cleaning. The alternative 62.1 Indoor Air Quality Procedure (IAQP) offers multiple possible benefits in this direction over the VRP, but seems too limited by insufficient specifications and inadequate available data to provide adequate protection for occupants. Ventilation system designers rarely choose to use it, finding it too arbitrary and requiring use of much non-engineering judgment and information that is not readily available. This report suggests strategies to revise the current ASHRAE IAQP to reduce its current limitations. These

  12. Maintenance and operation procedure, and feedback controls of the J-PARC RF-driven H{sup −} ion source

    SciTech Connect (OSTI)

    Ueno, A. Ohkoshi, K.; Ikegami, K.; Takagi, A.; Yamazaki, S.; Oguri, H.

    2015-04-08

    In order to satisfy the Japan Proton Accelerator Research Complex (J-PARC) second stage requirements of an H{sup −} ion beam of 60mA within normalized emittances of 1.5πmm•mrad both horizontally and vertically, a flat top beam duty factor of 1.25% (500μs×25Hz) and a life-time of longer than 1month, the J-PARC cesiated RF-driven H{sup −} ion source was developed by using an internal-antenna developed at the Spallation Neutron Source (SNS). The maintenance and operation procedure to minimize the plasma chamber (PCH) replacement time on the beam line, which is very important to maximize the J-PARC beam time especially for an antenna failure, is presented in this paper. The PCH preserved by filling argon (Ar) gas inside after pre-conditioning including pre-cesiation to produce the required beam at a test-stand successfully produced the required beam on the beam line with slight addition of cesium (Cs). The methods of the feedback controls of a 2MHz-RF-matching, an H{sup −} ion beam intensity and the addition of Cs are also presented. The RF-matching feedback by using two vacuum variable capacitors (VVCs) and RF-frequency shift produced the almost perfect matching with negligibly small reflected RF-power. The H{sup −} ion beam intensity was controlled within errors of ±0.1mA by the RF-power feedback. The amount of Cs was also controlled by remotely opening a Cs-valve to keep the RF-power lower than a settled value.

  13. Quality Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    QP001 Revision 0 Effective October 15, 2001 QUALITY PROGRAM Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _______________________________________________ Date: ______________ Donald B. Karner Procedure ETA-QP001 Revision 0 2 2001 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Scope 3 3.0 Documentation 3 4.0 Prerequisites 4 5.0 Exclusions 5 6.0 Quality

  14. Data quality objectives for TWRS privatization phase 1: tank waste transfer control

    SciTech Connect (OSTI)

    BANNING, D.L.

    1999-06-23

    The Phase 1 privatization contract (DOE-RL 1996) requires that the Project Hanford Management Contractors, on behalf of the U.S. Department of Energy, Richland Operations Office, deliver waste feed in appropriate quantities and composition on schedule. The Feed Process Management Team (FPMT) was created with responsibility for establishing requirements, identifying and recommending baseline change control, assuring configuration management of tank contents (e.g., feed pedigrees), and requiring understanding among the various TWRS elements so the right feed is produced on schedule (Boston 1996). The FPMT has charged the Double Shell Tank (DST) Waste Inventory Control (WIC) (LMHC 1997) group to develop and implement the waste configuration control needed to insure that our ability to deliver feed on schedule is not adversely impacted. The WIC group, which has representatives from engineering, environmental, operations, and waste feed delivery, reviews proposed waste transfers and technical issues affecting the TWRS waste inventory. The WIC group either approves proposed transfers or, if a unanimous decision is not obtained, elevates approval to the FPMT. A representative from the FPMT is present at the WIC group meetings where waste transfer approvals are decided, and WIC relays information to the FPMT as needed. The TWRS operations include waste inventory control, waste consolidation, waste transfers, compatibility evaluations, feed staging for privatization, and technical issues affecting waste transfers. Pumping restrictions are outlined in Boston (1998). The mobilization, retrieval, transfer, pretreatment, staging, and delivery of feed to the privatization contractor take place in the DST system. These tanks support multiple programs; therefore, the tank space must be allocated and controlled so as not to interfere with the delivery of feed by creating space bottlenecks or by significantly changing the composition or quantity of feed. Each feed tank selected for

  15. Data quality objectives for TWRS privatization, phase 1: Tank waste transfer control

    SciTech Connect (OSTI)

    Banning, D.L.

    1998-08-04

    The Phase 1 privatization contracts (DOE-M 1996) require that the Project Hanford Management Contractors, on behalf of the US Department of Energy, Richland Operations Office, deliver the appropriate quantities of the proper composition of feed on schedule. The Feed Process Management Team (FPMT) was created with responsibility for establishing requirements, identifying and recommending baseline change control, assuring correlation management of tank contents (e.g., feed pedigrees), and requiring understanding among the various TWRS elements so the right feed is produced on schedule (Boston 1996). The FPMT has charged the Double Shell Tank (DST) Waste Inventory Control (WIC) (LMHC 1997) group to develop and implement the waste configuration control needed to insure that the ability to deliver feed on schedule is not adversely impacted. The WIC group, which has representatives from engineering, environmental, operations, and waste feed delivery, reviews proposed waste transfers and technical issues affecting the TWRS waste inventory. The WIC group either approves proposed transfers or, if a unanimous decision is not obtained, elevates approval to the FPMT. A representative from the FPMT is present at the WIC group meetings where waste transfer approvals are decided, and WIC relays information to the FPMT as needed. The TWRS waste process includes waste inventory control, waste consolidation, waste transfers, compatibility, feed staging for privatization, and technical issues affecting waste transfers. Pumping restrictions are outlined in Wicks 1997. The mobilization, retrieval, transfer, pretreatment, staging, and delivery of feed to the privatization contractors takes place in the DST system. These tanks support multiple programs; therefore, the tank space must be allocated and controlled so as not to interfere with the delivery of feed by creating space bottle-necks or by significantly changing the composition or quantity of feed. Each feed tank selected for Phase

  16. SU-E-T-199: How Number of Control Points Influences the Dynamic IMRT Plan Quality and Deliverability

    SciTech Connect (OSTI)

    Sharma, S; Manigandan, D; Chander, S; Subramani, V; Julka, P; Rath, G

    2014-06-01

    Purpose: To study the influence of number of control points on plan quality and deliverability. Methods: Five previously treated patients of carcinoma of rectum were selected. Planning target volume (PTV) and organs at risk (OARs) i.e. bladder and bowel were contoured. Dynamic IMRT plans (6MV, 7-fields, 45Gy/25 fractions and prescribed at 95% isodose) were created in Eclipse (Varian medical system, Palo Alto, CA) treatment planning system (TPS) for Varian CL2300C/D linear-accelerator. Base plan was calculated with 166 control points, variable mode (Eclipse Default). For generating other plans, all parameters were kept constant, only number of control points (Fixed mode) was varied as follows: 100, 166 and 200. Then, plan quality was analyzed in terms of maximum and mean dose received by the PTV and OARs. For plan deliverability, TPS calculated fluence was verified with ImatriXX (IBA Dosimetry, Germany) array and compared with TPS dose-plane using gamma index criteria of 3% dose difference and 3mm distance to agreement (DTA). Total number of monitor units (MU) required to deliver a plan was also noted. Results: The maximum variation for the PTV maximum with respect to eclipse default control point (166) was 0.28% (0.14Gy). Similarly, PTV mean varied only up to 0.22 %( 0.11Gy). Bladder maximum and bladder mean varied up to 0.51% (0.24Gy) and 0.16% (0.06Gy). The variation for the bowel maximum and bowel mean was also only 0.39% (0.19Gy) and 0.33% (0.04Gy). Total MU was within 0.32 % (4MU). Average gamma pass rate using different control points for five patients are 98.750.33%, 99.370.09%, 99.290.12%, 98.140.13% and 99.250.14% respectively. Conclusion: Slight variation (<1%) in PTV and OARs maximum and mean doses was observed with varying number of control points. Monitor unit was also not varied much. Reducing number of control points did not showed any comprise in plan deliverability in terms of gamma index pass rate.

  17. Scanning ARM Cloud Radars. Part II: Data Quality Control and Processing

    SciTech Connect (OSTI)

    Kollias, Pavlos; Jo, Ieng; Borque, Paloma; Tatarevic, Aleksandra; Lamer, Katia; Bharadwaj, Nitin; Widener, Kevin B.; Johnson, Karen L.; Clothiaux, Eugene E.

    2014-03-01

    The Scanning ARM Cloud Radars (SACRs) are the primary instruments for documenting the four-dimensional structure and evolution of clouds within a 20-30 km radius from the ARM fixed and mobile sites. Here, the post-processing of the calibrated SACR measurements is discussed. First, a feature mask algorithm that objectively determines the presence of significant radar returns is described. The feature mask algorithm is based on the statistical properties of radar receiver noise. It accounts for atmospheric emission and is applicable even for SACR profiles with few or no signal-free range gates. Using the nearest-in-time atmospheric sounding, the SACR radar reflectivities are corrected for gaseous attenuation (water vapor and oxygen) using a line-by-line absorption model. Despite having a high pulse repetition frequency, the SACR has a narrow Nyquist velocity limit and thus Doppler velocity folding is commonly observed. An unfolding algorithm that makes use of a first guess for the true Doppler velocity using horizontal wind measurements from the nearest sounding is described. The retrieval of the horizontal wind profile from the HS-RHI SACR scan observations and/or nearest sounding is described. The retrieved horizontal wind profile can be used to adaptively configure SACR scan strategies that depend on wind direction. Several remaining challenges are discussed, including the removal of insect and second-trip echoes. The described algorithms significantly enhance SACR data quality and constitute an important step towards the utilization of SACR measurements for cloud research.

  18. Surface photovoltage method for the quality control of silicon epitaxial layers on sapphire

    SciTech Connect (OSTI)

    Yaremchuk, A. F.; Starkov, A. V.; Zaikin, A. V., E-mail: lynch0000@gmail.com [National Rsearch University MIET (Russian Federation); Alekseev, A. V. [ZAO Telekom-STV (Russian Federation); Sokolov, E. M. [ZAO Epiel (Russian Federation)

    2014-12-15

    The surface photovoltage method is used to study silicon-on-sapphire epitaxial layers with a thickness of 0.30.6 ?m, which are used to fabricate p-channel MOS (metaloxide-semiconductor) transistors with improved radiation hardness. It is shown that the manner in which the photoconductivity of the epitaxial layer decays after the end of a light pulse generated by a light-emitting diode (wavelength ?400 nm) strongly depends on the density of structural defects in the bulk of the structure. This enables control over how a silicon-on-sapphire structure is formed to provide the manufacturing of MOS structures with optimal operating characteristics.

  19. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  20. Scanning ARM Cloud Radars Part II: Data Quality Control and Processing

    SciTech Connect (OSTI)

    Kollias, Pavlos; Jo, Ieng; Borque, Paloma; Tatarevic, Aleksandra; Lamer, Katia; Bharadwaj, Nitin; Widener, Kevin B.; Johnson, Karen; Clothiaux, Eugene E.

    2014-03-01

    The Scanning ARM Cloud Radars (SACRs) are the primary instruments for documenting the four-dimensional structure and evolution of clouds within a 20-30 km radius from the ARM fixed and mobile sites. Here, the post-processing of the calibrated SACR measurements is discussed. First, a feature mask algorithm that objectively determines the presence of significant radar returns is described. The feature mask algorithm is based on the statistical properties of radar receiver noise. It accounts for atmospheric emission and is applicable even for SACR profiles with few or no signal-free range gates. Using the nearest-in-time atmospheric sounding, the SACR radar reflectivities are corrected for gaseous attenuation (water vapor and oxygen) using a line-by-line absorption model. Despite having a high pulse repetition frequency, the SACR has a narrow Nyquist velocity limit and thus Doppler velocity folding is commonly observed. An unfolding algorithm that makes use of a first guess for the true Doppler velocity using horizontal wind measurements from the nearest sounding is described. The retrieval of the horizontal wind profile from the Hemispherical Sky Range Height Indicator SACR scan observations and/or nearest sounding is described. The retrieved horizontal wind profile can be used to adaptively configure SACR scan strategies that depend on wind direction. Several remaining challenges are discussed, including the removal of insect and second-trip echoes. The described algorithms significantly enhance SACR data quality and constitute an important step towards the utilization of SACR measurements for cloud research.

  1. Policies and Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    procedures Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  2. Procedures - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Accelerator Safety (SAD & ASE) Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  3. Specified assurance level sampling procedure

    SciTech Connect (OSTI)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  4. Forrestal Garage Parking Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forrestal Garage Parking Procedures Forrestal Garage Parking Procedures Forrestal Garage Parking Procedures - The Forrestal Facility Parking Guide was created to define policies and procedures governing the assignment, use, and management of parking spaces controlled by the Department of Energy (DOE) in the Forrestal facility in Washington, DC. This guide applies to DOE Federal employees, including National Nuclear Security Administration (NNSA) Federal employees. These procedures were last

  5. WE-D-9A-06: Open Source Monitor Calibration and Quality Control Software for Enterprise Display Management

    SciTech Connect (OSTI)

    Bevins, N; Vanderhoek, M; Lang, S; Flynn, M

    2014-06-15

    Purpose: Medical display monitor calibration and quality control present challenges to medical physicists. The purpose of this work is to demonstrate and share experiences with an open source package that allows for both initial monitor setup and routine performance evaluation. Methods: A software package, pacsDisplay, has been developed over the last decade to aid in the calibration of all monitors within the radiology group in our health system. The software is used to calibrate monitors to follow the DICOM Grayscale Standard Display Function (GSDF) via lookup tables installed on the workstation. Additional functionality facilitates periodic evaluations of both primary and secondary medical monitors to ensure satisfactory performance. This software is installed on all radiology workstations, and can also be run as a stand-alone tool from a USB disk. Recently, a database has been developed to store and centralize the monitor performance data and to provide long-term trends for compliance with internal standards and various accrediting organizations. Results: Implementation and utilization of pacsDisplay has resulted in improved monitor performance across the health system. Monitor testing is now performed at regular intervals and the software is being used across multiple imaging modalities. Monitor performance characteristics such as maximum and minimum luminance, ambient luminance and illuminance, color tracking, and GSDF conformity are loaded into a centralized database for system performance comparisons. Compliance reports for organizations such as MQSA, ACR, and TJC are generated automatically and stored in the same database. Conclusion: An open source software solution has simplified and improved the standardization of displays within our health system. This work serves as an example method for calibrating and testing monitors within an enterprise health system.

  6. Department of Energy Support for Operations of the WMO/GAW Quality Control/Science Activity Center for the Americas

    SciTech Connect (OSTI)

    Hicks, B. B.

    2003-11-13

    As a formal activity of the World Meteorological Organization's Global Atmosphere Watch, to provide, through agency collaboration, a center of excellence in the United States that would impose quality assurance techniques on data collected by national air and precipitation quality networks operating in the Americas (north, south, and central).

  7. LSU/CAMD Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure Doc. ID: EM-PR-0001-001.doc Emergency Date: 2014/04/15 1. Safety is the responsibility of all working at CAMD. 2. Display this document at all beamlines, hutches, control room, laboratories and cleanrooms. 3. Report all unsafe acts or processes immediately to the CAMD Safety Office, by dialing 8-4616 from any facility phone or paging the CAMD Safety Officer: 9-952-5892 4. Injuries must be reported if medical intervention (physician) is or has been required. Fill out accident report

  8. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect (OSTI)

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  9. Handbook on procedures for implementing the National Environmental Policy Act

    SciTech Connect (OSTI)

    Orellana, A.M.

    1981-01-01

    This handbook establishes and presents for the Office of Surface Mining Reclamation and Enforcement (OSM) a comprehensive, logical set of procedures for implemeting the National Environmental Policy Act of 1969 (NEPA). (a) the legal framework with which OSM must comply is detailed in title I of NEPA, as amended. This handbook discusses responsibilities under title I and the following additional requirements resulting from NEPA; Section 2 of Executive Order 11514, Protection and Enhancement of Environmental Quality, as amended by Executive Order 11991; The regulations of the Council on Environmental Quality (CEQ) for implementing the procedural provisions of NEPA (40 CFR 1500-1508); The final procedures of the Department of the Interior (DOI) implementing NEPA (516 DM 1-7); and OSM's draft appendix to the above DOI procedures. (b) OSM is responsible for the implementation of the Surface Mining Control and Reclamation Act of 1977 (SMCRA), (30 U.S.C. 1201 et seq.). SMCRA has specific environmental protection performance standards designed to protect society and the environment from the adverse effects of surface coal mining operations and to reclaim mined areas left without adequate reclamation within these standards. As a Federal agency making decisions that affect the human environment, OSM must comply with NEPA.

  10. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  11. Awardee Share Procedures

    Broader source: Energy.gov (indexed) [DOE]

    Share Procedures Procedures for Correctly Reporting Awardee Share on the FAADSFAADS Plus reporting screen in STRIPES To ensure proper reporting by DOE to USASpending.gov, you...

  12. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    GARRISON, R.C.

    2000-09-22

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management.

  13. Probe into Gaseous Pollution and Assessment of Air Quality Benefit under Sector Dependent Emission Control Strategies over Megacities in Yangtze River Delta, China

    SciTech Connect (OSTI)

    Dong, Xinyi; Gao, Yang; Fu, Joshua S.; Li, Juan; Huang, Kan; Zhuang, G.; Zhou, Ying

    2013-11-01

    On February 29th 2012, China published its new National Ambient Air Quality Standard (CH-NAAQS) aiming at revising the standards and measurements for both gaseous pollutants including ozone (O3), nitrogen dioxide (NO2), and sulfur dioxide (SO2), and also particle pollutants including PM10 and PM2.5. In order to understand the air pollution status regarding this new standard, the integrated MM5/CMAQ modeling system was applied over Yangtze River Delta (YRD) within this study to examine the criteria gaseous pollutants listed in the new CH-NAAQS. Sensitivity simulations were also conducted to assess the responses of gaseous pollutants under 8 different sector-dependent emission reduction scenarios in order to evaluate the potential control strategies. 2006 was selected as the simulation year in order to review the air quality condition at the beginning of China’s 11th Five-Year-Plan (FYP, from 2006 to 2010), and also compared with air quality status in 2010 as the end of 11th FYP to probe into the effectiveness of the national emission control efforts. Base case simulation showed distinct seasonal variation for gaseous pollutants: SO2, and NO2 were found to have higher surface concentrations in winter while O3 was found to have higher concentrations in spring and summer than other seasons. According to the analyses focused on 3 megacities within YRD, Shanghai, Nanjing, and Hangzhou, we found different air quality conditions among the cities: NO2 was the primary pollutant that having the largest number of days exceeding the CH-NAAQS daily standard (80 μg/m3) in Shanghai (59 days) and Nanjing (27 days); SO2 was the primary pollutant with maximum number of days exceeding daily air quality standard (150 μg/m3) in Hangzhou (28 days), while O3 exceeding the daily maximum 8-hour standard (160 μg/m3) for relatively fewer days in all the three cities (9 days in Shanghai, 14 days in Nanjing, and 11 days in Hangzhou). Simulation results from predefined potential applicable

  14. Control of the positional relationship between a sample collection instrument and a surface to be analyzed during a sampling procedure with image analysis

    DOE Patents [OSTI]

    Van Berkel, Gary J.; Kertesz, Vilmos

    2011-08-09

    A system and method utilizes an image analysis approach for controlling the collection instrument-to-surface distance in a sampling system for use, for example, with mass spectrometric detection. Such an approach involves the capturing of an image of the collection instrument or the shadow thereof cast across the surface and the utilization of line average brightness (LAB) techniques to determine the actual distance between the collection instrument and the surface. The actual distance is subsequently compared to a target distance for re-optimization, as necessary, of the collection instrument-to-surface during an automated surface sampling operation.

  15. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  16. Control of the positional relationship between a sample collection instrument and a surface to be analyzed during a sampling procedure using a laser sensor

    DOE Patents [OSTI]

    Van Berkel, Gary J.; Kertesz, Vilmos

    2012-02-21

    A system and method utilizes distance-measuring equipment including a laser sensor for controlling the collection instrument-to-surface distance during a sample collection process for use, for example, with mass spectrometric detection. The laser sensor is arranged in a fixed positional relationship with the collection instrument, and a signal is generated by way of the laser sensor which corresponds to the actual distance between the laser sensor and the surface. The actual distance between the laser sensor and the surface is compared to a target distance between the laser sensor and the surface when the collection instrument is arranged at a desired distance from the surface for sample collecting purposes, and adjustments are made, if necessary, so that the actual distance approaches the target distance.

  17. Federal Agency NEPA Procedures

    Broader source: Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  18. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman; Katya Le Blanc

    2011-09-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  19. Evaluation of the International Atomic Energy Agency (IAEA) Safeguards Analytical Laboratory quality assurance program

    SciTech Connect (OSTI)

    Pietri, C.E.; Bracey, J.T.

    1985-02-01

    Destructive analysis is used by the International Atomic Energy Agency (IAEA) through its Safeguards Analytical Laboratory (SAL) to verify, in part, the inventory of nuclear materials at nuclear facilities. The reliability and quality of these meassurements must be assured in a systematic manner. The Division of Safeguards Evaluation, IAEA, required assistance in developing and implementing the quality assurance measures for the analytical procedures used in the destructive analysis of these safeguards samples. To meet these needs an ISPO POTAS Task D.53 was instituted in which consultants would review with IAEA staff the procedures used (or proposed) at SAL for the destructive analysis of safeguards samples and the statistical evaluation of the resulting measurement data at Headquarters. The procedures included analytical methods, qualtiy control measures, and the treatment of data from these activities. Based on this review, modifications to the system, if required, would be recommended which would provide routine assurance to management that these procedures are functioning properly to achieve safeguards objectives. In the course of this review, the sample handling procedures, measurement control activities, analytical methods, reference materials, calibration procedures, statistical analysis of data, and data management system were studied and evaluated. The degree to which SAL (as a total system) achieved laboratory quality assurance was assessed by comparison to accepted standards of quality assurance. 22 refs., 1 fig.

  20. Health Code Number (HCN) Development Procedure

    SciTech Connect (OSTI)

    Petrocchi, Rocky; Craig, Douglas K.; Bond, Jayne-Anne; Trott, Donna M.; Yu, Xiao-Ying

    2013-09-01

    This report provides the detailed description of health code numbers (HCNs) and the procedure of how each HCN is assigned. It contains many guidelines and rationales of HCNs. HCNs are used in the chemical mixture methodology (CMM), a method recommended by the department of energy (DOE) for assessing health effects as a result of exposures to airborne aerosols in an emergency. The procedure is a useful tool for proficient HCN code developers. Intense training and quality assurance with qualified HCN developers are required before an individual comprehends the procedure to develop HCNs for DOE.

  1. Analytical laboratory quality audits

    SciTech Connect (OSTI)

    Kelley, William D.

    2001-06-11

    Analytical Laboratory Quality Audits are designed to improve laboratory performance. The success of the audit, as for many activities, is based on adequate preparation, precise performance, well documented and insightful reporting, and productive follow-up. Adequate preparation starts with definition of the purpose, scope, and authority for the audit and the primary standards against which the laboratory quality program will be tested. The scope and technical processes involved lead to determining the needed audit team resources. Contact is made with the auditee and a formal audit plan is developed, approved and sent to the auditee laboratory management. Review of the auditee's quality manual, key procedures and historical information during preparation leads to better checklist development and more efficient and effective use of the limited time for data gathering during the audit itself. The audit begins with the opening meeting that sets the stage for the interactions between the audit team and the laboratory staff. Arrangements are worked out for the necessary interviews and examination of processes and records. The information developed during the audit is recorded on the checklists. Laboratory management is kept informed of issues during the audit so there are no surprises at the closing meeting. The audit report documents whether the management control systems are effective. In addition to findings of nonconformance, positive reinforcement of exemplary practices provides balance and fairness. Audit closure begins with receipt and evaluation of proposed corrective actions from the nonconformances identified in the audit report. After corrective actions are accepted, their implementation is verified. Upon closure of the corrective actions, the audit is officially closed.

  2. Surface Environmental Surveillance Procedures Manual

    SciTech Connect (OSTI)

    RW Hanf; TM Poston

    2000-09-20

    Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual.

  3. Quality Assurance Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Each employee is expected to do the job in accordance with procedures and other ... Communication and Outreach Stakeholder Satisfaction Survey CERCLA Sites Quality Assurance ...

  4. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  5. Participant Registration Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operations / participant registration procedure Participant Registration Procedure Under The "Safety" banner in the JLF Website "Policies and Procedures" Section: Complete Laser Eye Examination. Complete in LTRAIN HS5200-W Laser Safety. Complete in LTRAIN HS4258-W Beryllium (Be) Awareness. Complete in LTRAIN HS4261-W Lead (Pb) Awareness. Complete in LTRAIN HS5229-W Electrical Safety Awareness. Complete in LTRAIN HS-6001-W General Employee Radiological Training. Complete in

  6. Text Delegation Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

  7. NNMCAB Processes and Procedures

    Broader source: Energy.gov [DOE]

    At the January 8, 2014 Committee meeting NNMCAB Staff, Covered the Procedures and Processes that are used in Running the Board.

  8. 222-S Laboratory Quality Assurance Plan. Revision 1

    SciTech Connect (OSTI)

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.

  9. Quality engineering as a profession.

    SciTech Connect (OSTI)

    Kolb, Rachel R.; Hoover, Marcey L.

    2012-12-01

    Over the course of time, the profession of quality engineering has witnessed significant change, from its original emphasis on quality control and inspection to a more contemporary focus on upholding quality processes throughout the organization and its product realization activities. This paper describes the profession of quality engineering, exploring how today's quality engineers and quality professionals are certified individuals committed to upholding quality processes and principles while working with different dimensions of product development. It also discusses the future of the quality engineering profession and the future of the quality movement as a whole.

  10. Controlling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Controlling chaos in low- and high-dimensional systems with periodic parametric perturbations K. A. Mirus and J. C. Sprott Department of Physics, University of Wisconsin, Madison, Wisconsin 53706 ͑Received 29 June 1998͒ The effect of applying a periodic perturbation to an accessible parameter of various chaotic systems is examined. Numerical results indicate that perturbation frequencies near the natural frequencies of the unstable periodic orbits of the chaotic systems can result in limit

  11. Waste Management Quality Assurance Plan

    SciTech Connect (OSTI)

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  12. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  13. Text Redelegation Procedures - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Text Redelegation Procedures by Website Administrator Delegation Procedures Redelegation Procedures Redelegation Procedures for Functional Area Managers This page contains...

  14. ARM - Publications Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govPublicationsPublications Procedures Page Contents Types of ARM Publications Process for Publishing Planning Documents Science Reports Conference Documents Public Information Materials Recommendation for Journal Articles Proper Acknowledgments Publications Procedures Types of ARM Publications There are two main types of publications in ARM: (1) planning documents and (2) science reports. Planning documents include the ARM Program Plan, Science Plan, Locale Recommendation Plan, and Site

  15. Final Project Report on Arsenic Biogeochemistry in the Clinch River and Watts Bar Reservoir, Volume 2: Quality Assurance/Quality Control Summary Report for Arsenic Biogeochemistry in the Clinch River and Watts Bar Reservoir

    SciTech Connect (OSTI)

    Newman, K.A.

    1995-01-01

    prevent these problems in the future. Introduction, background, materials and methods, results, discussion, and conclusions are presented in Volume 1. The Quality Assurance/Quality Control Summary Report; the listing of water quality and surface water arsenic speciation data by source and site; and the listing of pore water arsenic speciation and particle-to-water distribution coefficients for As, Fe, and Mn by source, site, and season are presented in Volume 2. The Clinch River Environmental Restoration Program is currently completing the second phase of the Clinch River Remedial Investigation, with the intent of performing a baseline risk assessment on collected data. The data collected for this report will contribute to the baseline risk assessment for the Clinch River. Many of the goals of the Clinch River Remedial Investigation were refined using the results of this study.

  16. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  17. 10 CFR 1021: National Environmental Policy Act Implementing Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE, 2011) | Department of Energy 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011) 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011) The purpose of Part 10 CFR 1021 is to establish procedures that the Department of Energy (DOE) shall use to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)) and the Council on Environmental Quality (CEQ) regulations for implementing the

  18. EERE Quality Control Workshop Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    QC Workshop Agenda December 9-10, 2013 NREL, Energy Systems Integration Facility Monday, December 9 8:00 Sign-in and continental breakfast 8:30 NREL welcome: Keith Wipke, Fuel Cell and Hydrogen Technologies Laboratory Program Manager, NREL 8:50 EERE welcome: Nancy Garland, FCTO; Joe Cresko, AMO 9:15 Intro to the structure and objectives of the workshop: Cassidy Houchins, SRA 9:30 Overview of current processes: Michael Ulsh, NREL 9:50 Review of Oak Ridge process and QC activities: David Wood,

  19. Career Map: Quality Engineer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Engineer Career Map: Quality Engineer A male quality engineer sits at a desk with several computers showing data. Quality Engineer Position Title Quality Engineer Alternate Title(s) Quality Assurance, Quality Control Education & Training Level Advanced, Bachelors required, prefer graduate degree or equivalent experience Education & Training Level Description Quality engineers need a bachelor's degree in an engineering field, plus experience. Professional certifications may be

  20. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Quality Air Quality Tour The Laboratory calculates the dose to the maximally exposed individual (MEI) to determine effects of Laboratory operations on the public. Open full...

  1. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Quality Air Quality Tour The Laboratory calculates the dose to the maximally exposed individual (MEI) to determine effects of Laboratory operations on the public.

  2. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Quality Air Quality Tour The Laboratory calculates the dose to the maximally exposed individual (MEI) to determine effects of Laboratory operations on the public.

  3. Policy and Procedures for the Review of Federal Actions Impacting the Environment

    Broader source: Energy.gov [DOE]

    This manual establishes polices and procedures for carrying out the EPA's responsibilities to review and comment on Federal actions affecting the quality of the environment. 

  4. Policy and Procedures for the Review of Federal Actions Impacting the Environment (EPA, 1984)

    Broader source: Energy.gov [DOE]

    This manual establishes policies and procedures for carrying out the Environmental Protection Agency's responsibilities to review and comment on Federal actions affecting the quality of the environment.

  5. Policy and Procedures for the Review of Federal Actions Impacting the Environment

    Broader source: Energy.gov [DOE]

    This manual establishes policies and procedures for carrying out the Environmental Protection Agency's responsibilities to review and comment on Federal actions affecting the quality of the environment.

  6. Sandia software guidelines: Software quality planning

    SciTech Connect (OSTI)

    Not Available

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  7. Pilot Implementation of a Field Study Design to Evaluate the Impact of Source Control Measures on Indoor Air Quality in High Performance Homes

    SciTech Connect (OSTI)

    Widder, Sarah H.; Chamness, Michele A.; Petersen, Joseph M.; Singer, Brett C.; Maddalena, Randy L.; Destaillats, Hugo

    2014-10-20

    To improve the indoor air quality in new, high performance homes, a variety of standards and rating programs have been introduced to identify building materials that are designed to have lower emission rates of key contaminants of concern and a number of building materials are being introduced that are certified to these standards. For example, the U.S. Department of Energy (DOE) Zero Energy Ready Home program requires certification under the U.S. Environmental Protection Agency (EPA) Indoor airPLUS (IaP) label, which requires the use of PS1 or PS2 certified plywood and OSB; low-formaldehyde emitting wood products; low- or no-VOC paints and coatings as certified by Green Seal Standard GS-11, GreenGuard, SCS Indoor Advantage Gold Standard, MPI Green Performance Standard, or another third party rating program; and Green Label-certified carpet and carpet cushions. However, little is known regarding the efficacy of the IAP requirements in measurably reducing contaminant exposures in homes. The goal of this project is to develop a robust experimental approach and collect preliminary data to support the evaluation of indoor air quality (IAQ) measures linked to IAP-approved low-emitting materials and finishes in new residential homes. To this end, the research team of Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) developed a detailed experimental plan to measure IAQ constituents and other parameters, over time, in new homes constructed with materials compliant with IAP’s low-emitting material and ventilation requirements (i.e., section 6.1, 6.2, 6.3, and 7.2) and similar homes constructed to the state building code with conventional materials. The IAQ in IAP and conventional homes of similar age, location, and construction style is quantified as the differences in the speciated VOC and aldehyde concentrations, normalized to dilution rates. The experimental plan consists of methods to evaluate the difference between low

  8. Mesh Quality Improvement Toolkit

    Energy Science and Technology Software Center (OSTI)

    2002-11-15

    MESQUITE is a linkable software library to be used by simulation and mesh generation tools to improve the quality of meshes. Mesh quality is improved by node movement and/or local topological modifications. Various aspects of mesh quality such as smoothness, element shape, size, and orientation are controlled by choosing the appropriate mesh qualtiy metric, and objective function tempate, and a numerical optimization solver to optimize the quality of meshes, MESQUITE uses the TSTT mesh interfacemore » specification to provide an interoperable toolkit that can be used by applications which adopt the standard. A flexible code design makes it easy for meshing researchers to add additional mesh quality metrics, templates, and solvers to develop new quality improvement algorithms by making use of the MESQUITE infrastructure.« less

  9. SU-C-9A-02: Structured Noise Index as An Automated Quality Control for Nuclear Medicine: A Two Year Experience

    SciTech Connect (OSTI)

    Nelson, J; Christianson, O; Samei, E

    2014-06-01

    Purpose: Flood-field uniformity evaluation is an essential element in the assessment of nuclear medicine (NM) gamma cameras. It serves as the central element of the quality control (QC) program, acquired and analyzed on a daily basis prior to clinical imaging. Uniformity images are traditionally analyzed using pixel value-based metrics which often fail to capture subtle structure and patterns caused by changes in gamma camera performance requiring additional visual inspection which is subjective and time demanding. The goal of this project was to develop and implement a robust QC metrology for NM that is effective in identifying non-uniformity issues, reporting issues in a timely manner for efficient correction prior to clinical involvement, all incorporated into an automated effortless workflow, and to characterize the program over a two year period. Methods: A new quantitative uniformity analysis metric was developed based on 2D noise power spectrum metrology and confirmed based on expert observer visual analysis. The metric, termed Structured Noise Index (SNI) was then integrated into an automated program to analyze, archive, and report on daily NM QC uniformity images. The effectiveness of the program was evaluated over a period of 2 years. Results: The SNI metric successfully identified visually apparent non-uniformities overlooked by the pixel valuebased analysis methods. Implementation of the program has resulted in nonuniformity identification in about 12% of daily flood images. In addition, due to the vigilance of staff response, the percentage of days exceeding trigger value shows a decline over time. Conclusion: The SNI provides a robust quantification of the NM performance of gamma camera uniformity. It operates seamlessly across a fleet of multiple camera models. The automated process provides effective workflow within the NM spectra between physicist, technologist, and clinical engineer. The reliability of this process has made it the preferred

  10. Subsea HIPPS design procedure

    SciTech Connect (OSTI)

    Aaroe, R.; Lund, B.F.; Onshus, T.

    1995-12-31

    The paper is based on a feasibility study investigating the possibilities of using a HIPPS (High Integrity Pressure Protection System) to protect a subsea pipeline that is not rated for full wellhead shut-in pressure. The study was called the Subsea OPPS Feasibility Study, and was performed by SINTEF, Norway. Here, OPPS is an acronym for Overpressure Pipeline Protection System. A design procedure for a subsea HIPPS is described, based on the experience and knowledge gained through the ``Subsea OPPS Feasibility Study``. Before a subsea HIPPS can be applied, its technical feasibility, reliability and profitability must be demonstrated. The subsea HIPPS design procedure will help to organize and plan the design activities both with respect to development and verification of a subsea HIPPS. The paper also gives examples of how some of the discussed design steps were performed in the Subsea OPPS Feasibility Study. Finally, further work required to apply a subsea HIPPS is discussed.

  11. Records Management Exit Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records Management Exit Procedures For Departing Federal and contractor Employees PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and

  12. Laboratory Analytical Procedures | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Analytical Procedures NREL develops laboratory analytical procedures (LAPs) to provide validated methods for biofuels and pyrolysis bio-oils research. Biomass Compositional Analysis These lab procedures provide tested and accepted methods for performing analyses commonly used in biofuels research. Bio-Oil Analysis These lab procedures allow for the analysis of raw and upgraded pyrolysis bio-oils. Microalgae Compositional Analysis These lab procedures help scientists and researchers

  13. DACS upgrade acceptance test procedure

    SciTech Connect (OSTI)

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  14. Microalgal Biofuels Analysis Laboratory Procedures | Bioenergy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Microalgal Biofuels Analysis Laboratory Procedures NREL develops laboratory analytical procedures (LAPs) for analyzing microalgal biofuels. These procedures help scientists and ...

  15. Redelegation Procedures - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Redelegation Procedures by Website Administrator Text version available here. Delegation Procedures Re-Delegation Procedures Document Actions Redelegation...

  16. Quality assurance manual plutonium liquid scintillation methods and procedures

    SciTech Connect (OSTI)

    Romero, L.

    1997-01-01

    Nose swipe analysis is a very important tool for Radiation Protection personnel. Nose swipe analysis is a very fast and accurate method for (1) determining if a worker has been exposed to airborne plutonium contamination and (2) Identifying the area where there has been a possible plutonium release. Liquid scintillation analysis techniques have been effectively applied to accurately determine the plutonium alpha activity on nose swipe media. Whatman-40 paper and Q-Tips are the only two media which have been evaluated and can be used for nose swipe analysis. Presently, only Q-Tips are used by Group HSE-1 Radiation Protection Personnel. However, both swipe media will be discussed in this report.

  17. NNMCAB Meeting Procedure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Procedure NNMCAB Meeting Procedure A quick guide to the parliamentary procedure used by the NNMCAB during full Board Meetings. NNMCAB Meeting Procedure Guide (198.19

  18. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures (2)3.12.12.pdf (39.89 KB) More Documents & Publications Procedures for Departing Employees ...

  19. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures.doc (337 KB) More Documents & Publications Procedures for Departing Employees Records ...

  20. Surface cleanliness measurement procedure

    DOE Patents [OSTI]

    Schroder, Mark Stewart; Woodmansee, Donald Ernest; Beadie, Douglas Frank

    2002-01-01

    A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

  1. SU-E-T-270: Quality Control of Source Strength and Indexer Length in HDR Brachytherapy Using Sun Nuclear Mapcheck2

    SciTech Connect (OSTI)

    Morales, J

    2014-06-01

    Purpose: The goal of this work was to evaluate Sun Nuclear MapCheck2 capability for quantitative determination of both HDR source strength and position. Predictive power of Mapcheck2 dose matrix, originated by a microSelectron-v2 source from 22mm distance, was investigated. Methods: A Mick MultiDoc phantom with the 1400mm indexer length mark aligned over MapCheck2 central detector plus two additional 5cm plastic slabs were used as a composite phantom. Dose readings were transformed by applying published source anisotropy corrections and experimentally established radial dose and relative sensitivity factors. Angular dependence was not considered. Only readings from diodes located 2cm around the central detector were evaluated. The reproducibility of a fit between transformed dose readings and the ratio of virtual source strength and the square of source-detector distance was investigated. Four parameters were considered in the model: virtual source strength, lateral, longitudinal and vertical source positions. Final source strength calibration factor was calculated from the ratio of reference measurements and results from the fit. Results: Original lateral and longitudinal source position estimations had systematic errors of 0.39mm and 0.75mm. After subtracting these errors, both source positions were predicted with a standard deviation of 0.15mm. Results for vertical positions were reproducible with a standard deviation of 0.05mm. The difference between calculated and reference source strengths from 34 independent measurement setups had a standard deviation of 0.3%. The coefficient of determination for the linear regression between known indexer lengths and results from the fit in the range 1400mm 5mm was 0.985. Conclusions: ource strength can be estimated with MapCheck2 at appropriate accuracy levels for quality control. Verification of indexer length with present implementation is more accurate than visual alternatives. Results can be improved by designing a

  2. Review of the Sandia Site Office Quality Assurance Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    ... Plan, Rev. 10, 11212 * PLA 10-09, Software Quality Assurance Project Plan, Rev. 00, 1912 * Sandia Site Office Crosscutting Procedure 1304.02, Guidance and Expectations ...

  3. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    SciTech Connect (OSTI)

    Evans, Susan Kay; Orchard, B. J.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

  4. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    SciTech Connect (OSTI)

    Evans, S.K.

    2002-01-31

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

  5. Quality assurance program plan for SNF characterization support project

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  6. Oxynitride glass production procedure

    DOE Patents [OSTI]

    Weidner, Jerry R. (Idaho Falls, ID); Schuetz, Stanley T. (Idaho Falls, ID); O'Brien, Michael H. (Idaho Falls, ID)

    1991-01-01

    The invention is a process for the preparation of high quality oxynitride glasses without resorting to high pressures. Nitrogen-containing compounds such as Si.sub.3 N.sub.4 are first encapsulated in a low melting temperature glass. Particles of the encapsulated nitrogen-containing compound are mixed with other oxide glass-formers and melted in an atmosphere of flowing nitrogen and in the presence of buffering gas to form the oxynitride glass. Glasses containing up to 15 at % nitrogen have been prepared by this method.

  7. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  8. TMACS test procedure TP003: Graphics. Revision 5

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  9. Text Delegation Procedures - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Text Delegation Procedures Delegation Procedures Re-Delegation Procedures by Website Administrator Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed. Delegation Procedures Redelegation Procedures Procedures for Delegations of Authority Please use the following procedures when Proposing New Delegations; Redelegating Existing

  10. Proposed first-generation WSQ bit allocation procedure

    SciTech Connect (OSTI)

    Bradley, J.N.; Brislawn, C.M.

    1993-09-08

    The Wavelet/Scalar Quantization (WSQ) gray-scale fingerprint image compression algorithm involves a symmetric wavelet transform (SWT) image decomposition followed by uniform scalar quantization of each subband. The algorithm is adaptive insofar as the bin widths for the scalar quantizers are image-specific and are included in the compressed image format. Since the decoder requires only the actual bin width values -- but not the method by which they were computed -- the standard allows for future refinements of the WSQ algorithm by improving the method used to select the scalar quantizer bin widths. This report proposes a bit allocation procedure for use with the first-generation WSQ encoder. In previous work a specific formula is provided for the relative sizes of the scalar quantizer bin widths in terms of the variances of the SWT subbands. An explicit specification for the constant of proportionality, q, that determines the absolute bin widths was not given. The actual compression ratio produced by the WSQ algorithm will generally vary from image to image depending on the amount of coding gain obtained by the run-length and Huffman coding, stages of the algorithm, but testing performed by the FBI established that WSQ compression produces archival quality images at compression ratios of around 20 to 1. The bit allocation procedure described in this report possesses a control parameter, r, that can be set by the user to achieve a predetermined amount of lossy compression, effectively giving the user control over the amount of distortion introduced by quantization noise. The variability observed in final compression ratios is thus due only to differences in lossless coding gain from image to image, chiefly a result of the varying amounts of blank background surrounding the print area in the images. Experimental results are presented that demonstrate the proposed method`s effectiveness.