Powered by Deep Web Technologies
Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Texas Commission on Environmental Quality | Open Energy Information  

Open Energy Info (EERE)

Texas Commission on Environmental Quality Jump to: navigation, search Logo: Texas Commission on Environmental Quality Name Texas Commission on Environmental Quality Address 12100...

2

Oregon Environmental Quality Commission | Open Energy Information  

Open Energy Info (EERE)

Oregon Environmental Quality Commission Oregon Environmental Quality Commission Address 811 SW 6th Avenue Place Portland, Oregon Zip 97204-1390 Phone number 503-229-5301 Website http://www.oregon.gov/DEQ/EQC/ Coordinates 45.5182053°, -122.6790735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.5182053,"lon":-122.6790735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

3

Control System Commissioning for Enhanced Building Operations  

E-Print Network (OSTI)

This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems that can impact a commissioning exercise.

Salsbury, T. I.; Singhal, A.

2003-01-01T23:59:59.000Z

4

Building commissioning: The key to quality assurance  

SciTech Connect

This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

1998-05-01T23:59:59.000Z

5

Using Building Control System for Commissioning  

E-Print Network (OSTI)

This paper summarizes the different approaches developed during Annex 40 (research project of International Energy Agency - Energy Conservation in Buildings & Community Systems ) for carrying out commissioning activities using the control system. During our work we have found that control systems in buildings have the potential to greatly improve the commissioning process. In particular, control systems can be used to carry out automated testing on the energy systems in a building in a systematic way. Technologies for carrying out automated commissioning are still in their infancy and very few tools are available for practitioners to use. However, our work has demonstrated that tools can be built using existing infrastructure at relatively low cost. In many cases, tools are software programs that can be implemented on most microprocessor-based platforms.

Vaezi-Nejad, H.; Salsbury, T.; Choiniere, D.

2004-01-01T23:59:59.000Z

6

On the calibration and commissioning of lighting controls  

SciTech Connect

Lighting controls have the potential to capture significant energy savings in commercial buildings if properly specified, installed, commissioned and maintained. Proper commissioning is often absent in lighting projects and the lack of commissioning can significantly reduce a project`s energy savings potential. The paper focuses on the importance of good commissioning practice for obtaining satisfactory performance from lighting control systems and discusses the difficulties of commissioning today`s systems. Some practical suggestions for commissioning lighting controls is offered as well as advice to specifiers and early adopters to aid them in selecting controls that are most appropriate to their requirements.

Rubinstein, F.; Avery, D.; Jennings, J. [Lawrence Berkeley National Lab., CA (United States). Environmental Energy Technologies Div.; Blanc, S. [Pacific Gas and Electric Co., San Ramon, CA (United States). Customer Energy Management Dept.

1997-10-01T23:59:59.000Z

7

Commissioning  

SciTech Connect

Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

Huta, L.G.

1995-12-01T23:59:59.000Z

8

Commissioning and Performance Diagnostics for HVAC Control Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning and Performance Diagnostics for HVAC Control Systems Commissioning and Performance Diagnostics for HVAC Control Systems Speaker(s): Ashish Singhal Date: December 20, 2006 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Philip Haves The presentation will focus on practical aspects of commissioning control loops in commercial HVAC systems and evaluating their routine performance. Simple and theoretically sound methods for diagnosing control performance will be presented that detect serious performance issues associated with control loops in modern buildings. The discussion will center on a new control loop commissioning tool that helps field personnel to quickly test, tune and troubleshoot control loops. In addition to the active tests for commissioning control loops, a suite of diagnostic algorithms are used in a

9

Quality Assurance of LHC Cryogenic Instrumentation during Installation and Commissioning  

E-Print Network (OSTI)

The operation and monitoring of the LHC requires a cryogenic instrumentation system of an unprecedented size (800 instrumentation crates, holding 15000 sensors and actuators), with strict constraints on temperature measurement uncertainty and radiation hardness for all sensors and actuators. This paper presents the applied procedures of quality assurance and the specific hard- & software tools used to meet and track the mentioned requirements during its lifetime (fabrication, installation, commissioning, operation and maintenance); within the given constraints of time schedule, accessibility and coordination with other teams.

Lopez Lorente, A; Casas-Cubillos, J; Fortescue, E; Gomes, P; Jeanmonod, N; Peacoba, G; Vauthier, N

2008-01-01T23:59:59.000Z

10

Commissioning and Performance Diagnostics for HVAC Control Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning and Performance Diagnostics for HVAC Control Systems Speaker(s): Ashish Singhal Date: December 20, 2006 - 12:00pm Location: 90-3122 Seminar HostPoint of Contact:...

11

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

Conference on Building Commissioning: April 19-21, 2006Auto-DR Strategies and Commissioning One common questionConference on Building Commissioning: April 19-21, 2006

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

12

The Optimization of Control Parameters for VAV HVAC System Commissioning  

E-Print Network (OSTI)

One of the technical subjects in commissioning for HVAC system is to enhance control performance and time efficiency, while the tuning of the optimal parameters to control HVAC system takes much time and labor in particular. Therefore, we propose a kind of commissioning technique as follows. We identified the dynamic characteristics of components of an actual VAV HVAC system such as rooms, VAV dampers, two way valves and chilled water coils, and verified the behaviors of the models and choose the optimal control parameters on a personal computer. Then adopting them for the actual system, we verified the control performance. Through the procedure, we showed the possibility of off-site and off-line control parameter tuning to reduce the cost and time at on-site and in on-line using the measured data in a real HVAC system.

Song, S.; Maehara, K.; Sagara, N.

2006-01-01T23:59:59.000Z

13

Controls Advanced Research Turbine (CART) Commissioning and Baseline Data Collection  

DOE Green Energy (OSTI)

During FY2002, the CART turbine and controller were developed and commissioned. This included developing and checking out the protection and operational control systems. More than 50 hours of data were collected in constant and variable-speed modes. A new strategy, which underwent limited testing on the machine, was created for avoiding tower resonance. All the data from the checkout through the operational periods were organized, archived, and backed up.

Fingersh, L. J.; Johnson, K.

2002-10-01T23:59:59.000Z

14

Automated Demand Response Strategies and Commissioning CommercialBuilding Controls  

SciTech Connect

California electric utilities have been exploring the use of dynamic critical peak pricing (CPP) and other demand response programs to help reduce peaks in customer electric loads. CPP is a new electricity tariff design to promote demand response. This paper begins with a brief review of terminology regarding energy management and demand response, followed by a discussion of DR control strategies and a preliminary overview of a forthcoming guide on DR strategies. The final section discusses experience to date with these strategies, followed by a discussion of the peak electric demand savings from the 2005 Automated CPP program. An important concept identified in the automated DR field tests is that automated DR will be most successful if the building commissioning industry improves the operational effectiveness of building controls. Critical peak pricing and even real time pricing are important trends in electricity pricing that will require new functional tests for building commissioning.

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-05-01T23:59:59.000Z

15

Nuclear safety surveillance and control of National Nuclear Safety Administration of PRC during commissioning and operation of nuclear power plants  

Science Conference Proceedings (OSTI)

This article describes the method of nuclear safety surveillance and control of National Nuclear Safety Administration (NNSA) of PRC during commissioning and operation of nuclear power plants (NPPs) and the practice for Qinshan NPP and for Guangdong Daya Bay NPP (GNPS). The results of the practice show that the surveillance models set up for Qinshan NPP and for GNPS commissioning were effective and the surveillance has played an important role for ensuring the quality and safety of the commissioning testing and consequently the nuclear safety of these two plants.

Feng, W.; Zhang, C.

1994-12-31T23:59:59.000Z

16

Using Remote Control Systems for the Re-Commissioning of Heating Plants of School Building  

E-Print Network (OSTI)

The objective of this work is to develop a semi-automatic commissioning tool that can be implemented in Remote Control Systems to help building operators test the performance of heating plants in school buildings. The work was carried out with the city of Paris and the tool was adapted to the requirements of end-users who are operating more than 700 schools. This semi-automatic commissioning tool could help to reduce costs and time for commissioning tasks of a large number of buildings. It also helps to improve the commissioning process, to have a whole building functional testing approach and make the commissioning procedure available for different users with different skills. This work was carried out as part of an IEA Annex 40 research project, an international research group focused on energy saving technologies and activities that support their application in practice.

Vaezi-Nejad, H.; Detaille, C.; Jandon, M.; Bruyat, F.

2004-01-01T23:59:59.000Z

17

U.S. Nuclear Regulatory Commission Attn: Document Control Desk  

E-Print Network (OSTI)

Blade Interference Customer Guidance. In that letter GEH stated that: This determination does not apply to BWR/6 or ABWR plants or the ABWR/ESBWR Design Control Documents (DCD). Subsequent to the issuance of the reference letter, the NRC requested additional information as to the basis of this statement with regard to the applicability of this issue to the ABWR/ESBWR Design Control Documents (DCD). The following provides supporting information to address the basis for this statement: Both the ABWR and ESBWR reactivity control systems incorporate a Fine Motion Control Rod Drive (FMCRD) that is different than the Control Rod Drives supplied to the BWR/2-6. The scram pressure source is independent of RPV pressure thus the issues presented in the September 26, 2011 communication are not applicable to the ABWR or ESBWR design. The FMCRD provides hydraulicpowered rapid insertion (scram) of control rods during normal and abnormal operating conditions. The hydraulic power required for scram is provided by high pressure water stored in the individual Hydraulic Control Units (HCUs). Each HCU contains a scram accumulator charged to high pressure and the necessary valves and components to scram two FMCRDs. Upon scram valve actuation, high

Dale E. Porter; Castle Hayne Rd

2011-01-01T23:59:59.000Z

18

Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on Americas Nuclear Future  

Science Conference Proceedings (OSTI)

To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

Williams, Laura S.

2011-05-25T23:59:59.000Z

19

Results of Dose Control and Measurement Plans Appliedfor SPEAR3 Commissioning Year (FY04)  

Science Conference Proceedings (OSTI)

Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as Radiation Areas (RA). Areas outside RA were classified as Radiologically Controlled Area (RCA). Access to these areas required less training than the radiation areas. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

Khater, Hesham; Liu, James; Prinz, Alyssa; Allan, Jim; Rokni, Sayed; /SLAC

2007-02-12T23:59:59.000Z

20

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

loads. C P P is a new electricity tariff design to promotethe structures of electricity tariffs considering the timeand tariffs provide even greater incentives to consider sophisticated building operational and control strategies that reduce electricity

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

4 9 . Piette et at Automated Demand Response Strategies andDynamic Controls for Demand Response in New and ExistingFully Automated Demand Response Tests in Large Facilities"

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

22

Experience on Commissioning of Heating/Cooling System and Thermal/Air Quality Environment  

E-Print Network (OSTI)

This paper discusses how the commissioning process should be and the related problems, through a case study of a residential house. The items to be commissioned, measurement methods and the commissioning results are shown. Through the commissioning process, the problems pertaining to residential houses, such as the measurement problems, are clarified and the importance of commissioning established. Development of a simple and appropriate measuring method, monitoring of energy consumption and the verification of that value based on a standard value, enhancement of the resident's interest in the indoor environment and energy consumption and attention to their life style require future study.

Hokoi, S.; Miura, H.; Huang, Y.; Nakahara, N.; Iwamae, A.

2004-01-01T23:59:59.000Z

23

Water Quality Control (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Control (Texas) Water Quality Control (Texas) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility StateProvincial Govt Industrial Construction...

24

NREL Job Task Analysis: Quality Control Inspector  

SciTech Connect

A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

25

Improving Building Control and System Operation Through the Continuous Commissioning Process: A Case Study  

E-Print Network (OSTI)

Utilization of the Continuous Commissioning process is presented in the case of the Consolidated Mission Support Center office building at Travis Air Force Base in Travis, California. The CC process was applied to the building in early 2003. The examination of the heating, ventilating, and airconditioning (HVAC) and control systems revealed several areas where considerable improvement could be made, including air handling unit (AHU) operational parameters, terminal box and water loop operation, and Energy Management and Control System (EMCS) functionality. It also aided in the identification of mechanical systems needing repair. The optimization of the HVAC systems and advanced utilization of the EMCS reduced the combined heating and cooling energy consumption by 26% without capital intensive upgrades. Cooling energy decreased by 10%, heating energy was cut by over 40%, and fan power decreased by 28%. A hidden benefit to the implementation of the CC process is the reduction in the human capital required to operate the building. Prior to commissioning, significant time was spent changing system operating setpoints in an attempt to save energy. These efforts are no longer required.

Redmann, N.; Liu, M.

2003-01-01T23:59:59.000Z

26

Commissioning : The Total Process  

E-Print Network (OSTI)

In recent years, most new buildings have been equipped with increasingly sophisticated heating, ventilating, and air-conditioning (HVAC) systems, energy conservation equipment, lighting systems, security systems, and environmental control devices that rely on electronic control. Very frequently these systems and design features have not performed as expected. This can result in energy-efficiency losses. occupant complaints about comfort, indoor air quality problems. high operating costs, and increased liability for building owners, operators, employers, and design professionals. Building commissioning was developed in response to these concerns. Commissioning involves the examining and testing of building systems to verify aspects of the building design, ensure that the building is constructed in accordance with the contract documents, and verify that the building and its systems function according to the design intent documents. The process helps to integrate and organize the design, construction, operations, and maintenance of a building's systems to produce a healthy, comfortable, and efficient facility.

Kettler, G. J.

1998-01-01T23:59:59.000Z

27

Ventilation Controller for Improved Indoor Air Quality  

Iain Walker and colleagues at Berkeley Lab have developed a dynamic control system for whole-house ventilation fans that provides maximal air quality while reducing by 18-44% the energy spent on ventilation. The system, the Residential Integrated ...

28

Quality control during construction of power plants  

SciTech Connect

This paper traces the background and examines the necessity for a program to control quality during the construction phase of a power plant. It also attempts to point out considerations for making these programs cost effective.

Hartstern, R.F.

1982-03-01T23:59:59.000Z

29

Complex Quality Control of Meteorological Observations  

Science Conference Proceedings (OSTI)

A survey of the so-called complex quality control (CQC) of meteorological information is presented. The principles of the CQC approach are formulated. The CQC of rawinsonde height and temperature data at mandatory isobaric surfaces is described ...

Lev S. Gandin

1988-05-01T23:59:59.000Z

30

Quality Control of Large Argo Datasets  

Science Conference Proceedings (OSTI)

Argo floats have significantly improved the observation of the global ocean interior, but as the size of the database increases, so does the need for efficient tools to perform reliable quality control. It is shown here how the classical method ...

Fabienne Gaillard; Emmanuelle Autret; Virginie Thierry; Philippe Galaup; Christine Coatanoan; Thomas Loubrieu

2009-02-01T23:59:59.000Z

31

Colorado Water Quality Control Act | Open Energy Information  

Open Energy Info (EERE)

Water Quality Control Act Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Colorado Water Quality Control Act edit Details Activities (0) Areas...

32

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-02-01T23:59:59.000Z

33

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-03-01T23:59:59.000Z

34

Vermont Air Pollution Control Regulations, Ambient Air Quality...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ambient Air Quality Standards (Vermont) Vermont Air Pollution Control Regulations, Ambient Air Quality Standards (Vermont) Eligibility Utility Agricultural Investor-Owned Utility...

35

On power quality control center for providing unbundled power quality services.  

E-Print Network (OSTI)

??Using Power Quality Control Center (PQCC) to provide unbundled power quality services is investigated in this thesis. It begins with a detailed analysis of the (more)

Zhan, Yanqin.

2008-01-01T23:59:59.000Z

36

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

aspects of energy industry supply, production, transportation, delivery and distribution, demand CALIFORNIA ENERGY COMMISSION SCENARIO-BASED ASSESSMENT OF RESOURCE PLANS PREDICATED Integrated Energy Policy Report #12;CALIFORNIA ENERGY COMMISSION Michael R. Jaske Principal Author Global

37

Complex Quality Control of Significant Level Rawinsonde Temperatures  

Science Conference Proceedings (OSTI)

Rawinsonde heights and temperatures have been quality controlled using complex quality control at the National Centers for Atmospheric Prediction since December 1988 when an algorithm using only hydrostatic checking was introduced for the ...

William G. Collins

1998-02-01T23:59:59.000Z

38

Automatic Minimum and Maximum Alarm Thresholds for Quality Control  

Science Conference Proceedings (OSTI)

Automated quality control is a necessity for meteorological measurement networks because of an ever-increasing number of measurements. One of the basic quality control tests is to check that the observations fall into a range of acceptable ...

Vesa Hasu; Ari Aaltonen

2011-01-01T23:59:59.000Z

39

Quality Control for the Navy Operational Atmospheric Database  

Science Conference Proceedings (OSTI)

A new, operational meteorological database has been developed to provide quality-controlled observations for the atmospheric analysis and prediction systems at Fleet Numerical Oceanography Center (FNOC). The quality control procedures for the ...

Nancy L. Baker

1992-06-01T23:59:59.000Z

40

Energy Commission  

E-Print Network (OSTI)

This report was prepared as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees or the State of California. The Energy Commission, the State of California, its employees, contractors and subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the uses of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the California Energy Commission nor has the California Energy Commission passed upon the accuracy or adequacy of the information in this report. ii ACKNOWLEDGMENTS

Larry Waterland; M. Lorraine White; James J. Folkman; Ray Tuvell; Rosella Shapiro; B. B Blevins; Larry Waterl; Stefan Unnasch; Michael Jackson; M. Lorraine White; James M. Folkman; Sherry Stoner; Mckinley Addy; Asish Gautam; Tom Macdonald; Mike Mccormack; Tim Olson; Peter Quinliven

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Software Quality Assurance Control of Existing Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2.01.00 - 2002 2.01.00 - 2002 Software Quality Assurance Control of Existing Systems September 2002 United States Department of Energy Albuquerque Operations Office Abstract Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. Many of these systems are experiencing support problems. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included. SQA Control of Existing Systems SQAS22.01.00-2002

42

2013 Short Course Analytical Techniques: Quality Control, Process Control, and Refinery Optimization  

Science Conference Proceedings (OSTI)

Analytical Techniques: Quality Control, Process Control, and Refinery Optimization held at the 104th AOCS Annual Meeting and Expo. 2013 Short Course Analytical Techniques: Quality Control, Process Control, and Refinery Optimization Analytical Techn

43

Commission | OpenEI  

Open Energy Info (EERE)

57 57 Varnish cache server Commission Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

44

Georgia Water Quality Control Act (Georgia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Georgia Water Quality Control Act (Georgia) Georgia Water Quality Control Act (Georgia) Georgia Water Quality Control Act (Georgia) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The Georgia Water Quality Control Act (WQCA) is a set of environmental regulations and permitting requirements that comply with the federal Clean Water Act. The Georgia Water Quality Control Act is enforced by the Georgia

45

Georgia Air Quality Control Act (Georgia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Quality Control Act (Georgia) Air Quality Control Act (Georgia) Georgia Air Quality Control Act (Georgia) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Georgia Program Type Climate Policies Environmental Regulations Provider Georgia Department of Natural Resources The Georgia Air Quality Control Act (AQCA) is a set of environmental regulations, permitting requirements, and air quality standards that control the amount of pollutants emitted and who emits them. The AQCA

46

Passive ventilation for residential air quality control  

SciTech Connect

Infiltration has long served the residential ventilation needs in North America. In Northern Europe it has been augmented by purpose-provided natural ventilation systems--so-called passive ventilation systems--to better control moisture problems in dwellings smaller than their North American counterparts and in a generally wetter climate. The growing concern for energy consumption, and the environmental impacts associated with it, has however led to tighter residential construction standards on both continents and as a result problems associated with insufficient background ventilation have surfaced. Can European passive ventilation systems be adapted for use in North American dwellings to provide general background ventilation for air quality control? This paper attempts to answer this question. The configuration, specifications and performance of the preferred European passive ventilation system--the passive stack ventilation (PSV) system--will be reviewed; innovative components and system design strategies recently developed to improve the traditional PSV system performance will be outlined; and alternative system configurations will be presented that may better serve the climatic extremes and more urban contexts of North America. While these innovative and alternative passive ventilation systems hold great promise for the future, a rational method to size the components of these systems to achieve the control and precision needed to meet the conflicting constraints of new ventilation and air tightness standards has not been forthcoming. Such a method will be introduced in this paper and an application of this method will be presented.

Axley, J.

1999-07-01T23:59:59.000Z

47

Design, construction and commissioning of the Thermal Screen Control System for the CMS Tracker detector at CERN  

E-Print Network (OSTI)

The CERN (European Organization for Nuclear Research) laboratory is currently building the Large Hadron Collider (LHC). Four international collaborations have designed (and are now constructing) detectors able to exploit the physics potential of this collider. Among them is the Compact Muon Solenoid (CMS), a general purpose detector optimized for the search of Higgs boson and for physics beyond the Standard Model of fundamental interactions between elementary particles. This thesis presents, in particular, the design, construction, commissioning and test of the control system for a screen that provides a thermal separation between the Tracker and ECAL (Electromagnetic CALorimeter) detector of CMS (Compact Muon Solenoid experiment). Chapter 1 introduces the new challenges posed by these installations and deals, more in detail, with the Tracker detector of CMS. The size of current experiments for high energy physics is comparable to that of a small industrial plant: therefore, the techniques used for controls a...

Carrone, E; Tsirou, A

48

Statewide Air Emissions Calculations from Wind and Other Renewables, Summary Report: A Report to the Texas Commission on Environmental Quality for the Period September 2007 - August 2008  

E-Print Network (OSTI)

The 79th Legislature, through Senate Bill 20, House Bill 2481 and House Bill 2129, amended Senate Bill 5 to enhance its effectiveness by adding 5,880 MW of generating capacity from renewable energy technologies by 2015 and 500 MW from non-wind renewables. This legislation also requires the Public Utilities Commission of Texas (PUCT) to establish a target of 10,000 megawatts of installed renewable capacity by 2025, and requires the Texas Commission on Environmental Quality (TCEQ) to develop methodology for computing emissions reductions from renewable energy initiatives and the associated credits. In this Legislation the Energy Systems Laboratory (ESL or Laboratory) is to assist the TCEQ in quantifying emissions reductions credits from energy efficiency and renewable energy programs, through a contract with the Texas Environmental Research Consortium (TERC) to develop and annually calculate creditable emissions reductions from wind and other renewable energy resources for the State Implementation Plan (SIP). The Energy Systems Laboratory, in fulfillment of its responsibilities under this Legislation, submits its third annual report, Statewide Air Emissions Calculations from Wind and Other Renewables, to the Texas Commission on Environmental Quality. The report is organized in several deliverables: A Summary Report, which details the key areas of work; Supporting Documentation; and Supporting data files, including weather data, and wind production data, which have been assembled as part of the third years effort. This executive summary provides summaries of the key areas of accomplishment this year, including: Continuation of stakeholders meetings; Analysis of power generation from wind farms using improved method and 2006 data; Analysis of emissions reduction from wind farms; Updates on degradation analysis; Analysis of other renewables, including: PV, solar thermal, hydroelectric, geothermal and landfill gas; Review of electricity generation by renewable sources and transmission planning study reported by ERCOT; Review of combined heat and power projects in Texas; and Preliminary reporting of NOx emissions savings in the 2007 Integrated Savings report to the TCEQ.

Gilman, D.; Yazdani, B.; Haberl, J. S.; Baltazar-Cervantes, J. C.; Subbarao, K.; Culp, C.; Liu, Z.

2008-08-01T23:59:59.000Z

49

APPLICATION OF MATHEMATICAL PROGRAMMING MODELS TO COAL QUALITY CONTROL.  

E-Print Network (OSTI)

??The problem of utilizing blending techniques to control coal quality at the production-consumption phase is considered. Three blending models were developed to provide coal of (more)

BAAFI, ERNEST YAW.

1983-01-01T23:59:59.000Z

50

ARM: Surface Radiation Measurement Quality Control testing, including climatologically configurable limits  

DOE Data Explorer (OSTI)

Surface Radiation Measurement Quality Control testing, including climatologically configurable limits

Gary Hodges; Tom Stoffel; Mark Kutchenreiter; Bev Kay; Aron Habte; Michael Ritsche; Victor Morris; Mary Anderberg

51

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

with California's coastal power plant fleet; 3) biological resource issues associated with solar thermal.......................................................................23 CHAPTER 3: Cooling Water Use at New Power Plants Subject to Energy Commission Jurisdiction Cooling Water Trends for California Power Plants

52

Software Quality Assurance Control of Existing Systems | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included Software Quality Assurance Control of Existing Systems More Documents & Publications Software Quality Assurance Control of Existing Systems Software Quality: A Guide to Responsibilities and Resources, SQAS

53

Guidelines for residential commissioning  

E-Print Network (OSTI)

Potential Benefits of Commissioning California Homes.Delp. 2000. Residential Commissioning: A Review of Relatedfor Evaluating Residential Commissioning Metrics Lawrence

Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

2003-01-01T23:59:59.000Z

54

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Process Commissioning Process Commissioning Process October 7, 2013 - 9:19am Addthis The commissioning process for Federal facilities generally follows a four-step process. This process holds true across all forms of commissioning and for both new and existing buildings. Step 1: Planning The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step include: Optimizing building operations to reduce operating costs Addressing complaints from occupants regarding air quality or comforts Creating a model facility Improving facility operations and maintenance (O&M) and reducing emergency calls. When forming the commissioning team, considerations could include

55

California Energy Commission COMMISSION REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity resource. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CMF. #12;ii #12;iii) ................................................................ 20 Supply Form S2: Energy Balance Table

56

California Energy Commission FINAL COMMISSION REPORT  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Sixth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor AUGUST 2012 CEC3002012006CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN J. DOUGLAS, J

57

NIF Projects Controls and Information Systems Software Quality Assurance Plan  

SciTech Connect

Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

Fishler, B

2011-03-18T23:59:59.000Z

58

Rivanna River Basin Commission (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

59

Software Quality Assurance Control of Existing Systems | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Assurance Control of Existing Systems Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included Software Quality Assurance Control of Existing Systems More Documents & Publications Software Quality Assurance Control of Existing Systems Software Quality: A Guide to Responsibilities and Resources, SQAS

60

Water Quality Control Act (Tennessee) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Water Quality Control Act (Tennessee) Water Quality Control Act (Tennessee) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Tennessee Program Type Environmental Regulations Siting and Permitting Provider Tennessee Department Of Environment and Conservation The Water Quality Control Act (WQCA) establishes the water pollution

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Power quality control on the Romanian energy market  

Science Conference Proceedings (OSTI)

Power quality is one of the important objectives of the transmission and distribution network. The paper presents several aspects of the PQ monitoring interface between the transmission network and the distribution network. 110 kV voltage level, in view ... Keywords: control, energy market, power quality

A. S. Jude; P. Ehegardner; P. Andea; D. Vatau; F. M. Frigura-Iliasa

2009-05-01T23:59:59.000Z

62

European Commission  

NLE Websites -- All DOE Office Websites (Extended Search)

European Commission European Commission Directorate-General for Energy & Transport Ministry of Industry an Energy of the State of Qatar Gulf Co-operation Council Secretariat General EU-GCC Seminar: "Natural Gas Technologies - Realities & Prospects" Doha, Qatar, 7-8 February 2005 STREAM B: "Advanced Technologies for Power Generation through Natural Gas & Desalination" SESSION B.3: STATE OF THE ART OF COMBINED CYCLE PLANT Michael VOLLMER, Head of Combined Cycle Power Plant Development, ALSTOM Power Turbo-Systems February 2005 February 2005 Power Turbo-Systems State Of The Art Combined Cycle Power Plants Michael Vollmer 2 ALSTOM (Switzerland)Ltd© 2005. Preliminary/for discussion purposes only. We reserve all rights in this document and in the information

63

Quality Control and Verification of Weather Radar Wind Profiles  

Science Conference Proceedings (OSTI)

Weather radar wind profiles (WRWPs) have been retrieved from Doppler volume scans using different implementations of the velocityazimuth display (VAD) and volume velocity processing (VVP) methods. An extensive quality control of the radial ...

Iwan Holleman

2005-10-01T23:59:59.000Z

64

Comprehensive Hydrostatic Quality Control at the National Meteorological Center  

Science Conference Proceedings (OSTI)

The Comprehensive Hydrostatic Quality Control (CHQC) of rawinsonde data on height and temperature at mandatory isobaric surfaces designed and implemented at the National Meteorological Center in Washington is described in detail. Main principles ...

William G. Collins; Lev S. Gandin

1990-12-01T23:59:59.000Z

65

Quality improvement and control based on defect reduction  

E-Print Network (OSTI)

This thesis addresses the quality improvement in a printing process at a food packaging company now experiencing hundreds of printing defects. Methodologies of Define, Measure, Analyze, Improve, and Control (DMAIC), and ...

Dai, Qi, M. Eng. Massachusetts Institute of Technology

2010-01-01T23:59:59.000Z

66

Data Quality Control Based on Self-Consistency  

Science Conference Proceedings (OSTI)

Conducting meteorological measurements, one is always confronted with a wide variety of different types of errors and with the decision of how to correct data for further use, if necessary. The selection of an adequate quality control (QC) ...

Reinhold Steinacker; Dieter Mayer; Andrea Steiner

2011-12-01T23:59:59.000Z

67

Analysis and Quality Control of Profiler Data Using Optimum Interpolation  

Science Conference Proceedings (OSTI)

An application of optimum interpolation (OI) is described for quality control and combination of wind profiler data with other observations of wind profiles. Data from three separate wind sensors at the National Aeronautics and Space ...

Thomas Nehrkorn

2000-05-01T23:59:59.000Z

68

Best Practices in Existing Building Commissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 20-21, 2010 OCTOBER 20-21, 2010 RAPID CITY, SD Best Practices in Existing Building Commissioning Carl E. Lundstrom, P. E., CCP Federal Solutions Manager E M C Engineers, Inc. - Subsidiary of Eaton Corporation * The Purpose & Benefits of Existing Building Commissioning (EBCx) * The Building Commissioning Association (BCA) & "Best Practices" * Contracting & Hiring Qualified Providers * Typical Measures & Ideal Facilities * Success Factors Presentation Agenda What is The Building Commissioning Association? Integrity Leadership Quality Expertise  International non-profit organization (founded in 1998)  Recognized commissioning authority and resource  Commissioning providers, building owners, energy companies, facility managers, architects, engineers, and contractors

69

Magnetically Controlled Reactor Shrinks Power Quality Costs and Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Magnetically Controlled Reactor Shrinks Power Quality Costs and Power Magnetically Controlled Reactor Shrinks Power Quality Costs and Power Losses Speaker(s): Mark D. Galperin Date: December 18, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Diana Morris In a new, magnetically controlled reactor (MCR), in which DC pulsing through a special winding controls inductive susceptance, high saturation of the magnetic circuit steel with optimal magnetic and electrical circuit parameters ensures less than 2-3% main harmonic distortion even without special filters. Transformer-like construction ensures reliable operation. MCR's increase power quality through automatic voltage regulation, reduced fluctuation, and smoothing of reactive power surges at 1/2 the cost of thyristor-controlled reactors (TCR's). Damping of voltage-oscillation

70

SPEAR3 | Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

list (updated 060605) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt) Commissioning Schedule(.mpp) Run Schedule...

71

Using Simulation Models for Building Commissioning  

E-Print Network (OSTI)

The International Energy Agency ECBCS Annex 40 Commissioning of Buildings and HVAC Systems for Improved Energy Performance task investigating Use of Whole Building Simulation in Commissioning has identified the following applications of whole simulation in the commissioning process: 1) during the design process; 2) in post-construction commissioning of new buildings; 3) design simulation for ongoing commissioning; 4) calibrated simulation for retro commissioning; 5) calibrated simulation for on-going commissioning; and 6) simulation to evaluate new control code. These applications are discussed and examples of each of these applications are provided. The only one of these which has been applied in routine commissioning projects is the use of calibrated simulation for retro commissioning. The other examples have been applied in a research setting, and costs must be lowered for routine application, but there appears to be potential for significant application of simulation in the commissioning process.

Claridge, D. E.

2004-01-01T23:59:59.000Z

72

Hawaii Department of Health Office of Environmental Quality Control | Open  

Open Energy Info (EERE)

Office of Environmental Quality Control Office of Environmental Quality Control Jump to: navigation, search Name Hawaii Department of Health Office of Environmental Quality Control Address 235 S. Beretania Suite 702 Place Honolulu, Hawaii Zip 96813 Website http://hawaii.gov/health/envir Coordinates 21.3094485°, -157.8578603° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.3094485,"lon":-157.8578603,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

73

Research review: Indoor air quality control techniques  

Science Conference Proceedings (OSTI)

Techniques for controlling the concentration of radon, formaldehyde, and combustion products in the indoor air are reviewed. The most effective techniques, which are generally based on limiting or reducing indoor pollutant source strengths, can decrease indoor pollutant concentrations by a factor of 3 to 10. Unless the initial ventilation rate is unusually low, it is difficult to reduce indoor pollutant concentrations more than approximately 50% by increasing the ventilation rate of an entire building. However, the efficiency of indoor pollutant control by ventilation can be enhanced through the use of local exhaust ventilation near concentrated sources of pollutants, by minimizing short circuiting of air from supply to exhaust when pollutant sources are dispersed and, in some situations, by promoting a displacement flow of air and pollutants toward the exhaust. Active air cleaning is also examined briefly. Filtration and electrostatic air cleaning for removal of particles from the indoor air are the most practical and effective currently available techniques of air cleaning. 49 refs., 7 figs.

Fisk, W.J.

1986-10-01T23:59:59.000Z

74

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.on a support structure, and commissioning of the RFQ. Theabout 1.0 dB. BEAM COMMISSIONING RESULTS Beam commissioning

2002-01-01T23:59:59.000Z

75

Practical Handbook of Soybean Processing and Utilization Chapter 24 Soybean Processing Quality Control  

Science Conference Proceedings (OSTI)

Practical Handbook of Soybean Processing and Utilization Chapter 24 Soybean Processing Quality Control Processing eChapters Processing Downloadable pdf of Chapter 24 Soybean Processing Quality Control from ...

76

Transformer Thermal Modeling: Improving Reliability Using Data Quality Control  

E-Print Network (OSTI)

1 Transformer Thermal Modeling: Improving Reliability Using Data Quality Control Daniel J. Tylavsky--Eventually all large transformers will be dynamically loaded using models updated regularly from field measured data. Models obtained from measured data give more accurate results than models based on transformer

77

Optimisation of product quality and minimisation of its variation in climate controlled operations  

Science Conference Proceedings (OSTI)

An optimisation procedure is presented for direct control of product quality of agro-material and minimisation of its quality variation. The procedure builds on a previously presented model structure, which is briefly reviewed, together forming a methodological ... Keywords: Climate control, Hierarchial control, Optimisation, Potato storage, Product quality control, Quality variation

G.J. C. Verdijck; G. van Straten; H. A. Preisig

2005-08-01T23:59:59.000Z

78

Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Commissioning Commissioning October 16, 2013 - 4:43pm Addthis Project Construction Commissioning Operations & Maintenance Commissioning renewable energy for new construction projects and major renovations requires special consideration in selecting the commissioning agent and team, developing the specifications, conducting the full commissioning process, and integrating measurement and verification (M&V) systems. Commissioning can reduce overall costs related to construction deficiencies and ensure more efficient building and systems operation. For new construction projects or major renovations with renewable energy systems, commissioning is critical to the ultimate goal of operating all building systems as safely, optimally, and efficiently as their designers intended.

79

NOx Emissions Reduction from CPS Energy's "Save For Tomorrow Energy Plan" Within the Alamo Area Council of Governments Report to the Texas Commission on Environmental Quality  

E-Print Network (OSTI)

ESL used the Texas Commission on Environmental Qualitys (TCEQ) Guide for Incorporating Energy Efficiency/Renewable Energy (EE/RE) Projects into the SIP for local entities dated February 6, 2004 to survey potential projects in the AACOG area that occurred after the States base period (September 1, 2001) for their local Clean Air Plan. CPS Energy retained Nexant, Inc. (Nexant) to conduct a comprehensive, independent measurement and verification (M&V) evaluation of CPS Energys 2009 DSM programs. Nexant surveyed the energy and demand savings achieved by CPS Energys 2009 DSM programs. In 2009, the programs offered by CPS Energy had two sectors: residential and non-residential (commercial). To determine net program impacts, Nexant conducted market research of evaluations for other utility-sponsored DSM programs around the country. From the survey conducted in 2009, total net energy and demand savings from the residential and non-residential sectors are 86,712,978 kWh (residential subtotal is 62,369,566 kWh and non-residential subtotal is 24,343,412 kWh). Nexant calculated CPS Energys DSM potential through 2020 and found there to be significant room for program growth. Total cumulative achievable savings through the 2020 program year are expected to be 2,543 GWh of electricity savings (based on the aggressive incentive scenario and exception of industrial sector). According to the TCEQ/ESL, the total annual NOx emissions reductions estimated through 2009 energy savings were 114.03 ton/year. Annual NOx emissions reductions of residential sector were 82.02 ton/yr and annual NOx emissions reductions of non-residential sector were 32.01 Ton/yr. The NOx emissions reductions estimated through 2020 energy savings potential were 3,344 ton/year. Annual NOx emissions reductions of residential sector were 1,873 ton/yr and annual NOx emissions reductions of non-residential sector, except of industrial sector, were 1,471 ton/yr.

Do, S. L.; Baltazar, J. C.; Haberl, J.; Yazdani, B.

2010-10-01T23:59:59.000Z

80

Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre  

E-Print Network (OSTI)

Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

California Energy Commission DRAFT COMMISSION REPORT  

E-Print Network (OSTI)

Via E-Filing RE: Klamath Hydroelectric Project (FERC Project No. 2082). California Energy Commission COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov April 19, 2007 Ms. Philis Posey Acting Secretary Federal Energy Regulatory Commission 888 First Street NE ­ Room 1A Washington, DC 20246

82

River Basin Commissions (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

83

X-ray Spectroscopy for Quality Control of Chemotherapy Drugs  

Science Conference Proceedings (OSTI)

We develop a method, employing Compton peak standardization and the use of matrix-matched spiked samples with Total Reflection X-ray Fluorescence (TXRF), for the determination of platinum plasma concentrations of patients undergoing chemotherapy with Pt-bearing drugs. Direct blood plasma analysis attains Pt detection limits of 70 ng/ml. Measurement results of prescribed drug doses are compared to achieved blood Pt concentrations indicating a lack of expected correlations. Direct analysis of Pt-containing infused drugs from a variety of suppliers indicates cases of abnormal concentrations which raises quality control issues. We demonstrate the potential usefulness of the method for pharmacokinetic studies or for routine optimization and quality control of Pt chemotherapy treatments.

Greaves, E. D.; Barros, H.; Bermudez, J.; Sajo-Bohus, L. [Universidad Simon Bolivar, Apartado 89000, Caracas 1080A (Venezuela); Angeli-Greaves, M. [Universidad Central de Venezuela, Apartado 90373 Caracas 1083A (Venezuela)

2007-10-26T23:59:59.000Z

84

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

the state board to adopt a schedule of fees to be paid by regulated sources of greenhouse gas emissions compliance schedule, alternative control technology, a process change, or a product substitution. (c) "Carbon sources or categories of sources, subject to the criteria and schedules set forth in this part. #12;Text

85

Quality control and estimation of global solar radiation in China  

Science Conference Proceedings (OSTI)

Measurements of surface radiation in China are too sparse to meet demand for scientific research and engineering applications. Moreover, the radiation data often include erroneous and questionable values though preliminary quality-check has been done before the data release. Therefore, quality control of radiation data is often a prerequisite for using these data. In this study, a set of quality-check procedures were implemented to control the quality of the solar radiation measurements at 97 stations in China. A hybrid model for estimating global solar radiation was then evaluated against the controlled data. The results show that the model can estimate the global radiation with accuracy of MBE less than 1.5 MJ m{sup -2} and RMSE less than 2.8 MJ m{sup -2} for daily radiation and RMSE less than 2.0 MJ m{sup -2} for monthly-mean daily radiation at individual stations over most of China except at a few stations where unsatisfactory estimates were possibly caused by severe air pollution or too dense clouds. The MBE averaged over all stations are about 0.7 MJ m{sup -2} and RMSE about 2.0 MJ m{sup -2} for daily radiation and RMSE about 1.3 MJ m{sup -2} for monthly-mean daily radiation. Finally, this model was used to fill data gaps and to expand solar radiation data set using routine meteorological station data in China. This data set would substantially contribute to some radiation-related scientific studies and engineering applications in China. (author)

Tang, Wenjun; He, Jie [Key Laboratory of Tibetan Environment Changes and Land Surface Processes, Institute of Tibetan Plateau Research, Chinese Academy of Sciences, Beijing 100085 (China); Graduate School of Chinese Academy of Sciences, Beijing 100049 (China); Yang, Kun; Qin, Jun [Key Laboratory of Tibetan Environment Changes and Land Surface Processes, Institute of Tibetan Plateau Research, Chinese Academy of Sciences, Beijing 100085 (China)

2010-03-15T23:59:59.000Z

86

Ettore F. BOMPARD, European Commission, Institute for Energy and Market-based control in emerging distribution system operation  

E-Print Network (OSTI)

in emerging distribution system operation In emerging electrical distribution systems, a multitude of self by distributed and adaptive control signals over prosumers, market-based control needs to make prosumer benefits

Nesterov, Yurii

87

The Guy at the Controls: Labor Quality and Power Plant Efficiency  

E-Print Network (OSTI)

Controls: Labor Quality and Power Plant Efficiency July 2007Controls: Labor Quality and Power Plant E ciency James B.on the fuel e ciency of power plants. Although electricity

Bushnell, Jim B; Wolfram, Catherine D

2007-01-01T23:59:59.000Z

88

Hydrogenation of Fats and Oils: Theory and PracticeChapter 12 Quality and Control  

Science Conference Proceedings (OSTI)

Hydrogenation of Fats and Oils: Theory and Practice Chapter 12 Quality and Control Processing eChapters Processing Press Downloadable pdf of Chapter 12 Quality and Control from the book ...

89

CR mammography: Design and implementation of a quality control program  

SciTech Connect

Despite the recent acquisition of significant quantities of computed radiography CR equipment for mammography, Mexican regulations do not specify the performance requirements for digital systems such as those of CR type. The design of a quality control program QCP specific for CR mammography systems was thus considered relevant. International protocols were taken as reference to define tests, procedures and acceptance criteria. The designed QCP was applied in three CR mammography facilities. Important deficiencies in spatial resolution, noise, image receptor homogeneity, artifacts and breast thickness compensation were detected.

Moreno-Ramirez, A.; Brandan, M. E.; Villasenor-Navarro, Y.; Galvan, H. A.; Ruiz-Trejo, C. [Instituto de Fisica, Universidad Nacional Autonoma de Mexico, DF 04510 (Mexico); Departamento de Radiodiagnostico, Instituto Nacional de Cancerologia, DF 14080 (Mexico); Instituto de Fisica, Universidad Nacional Autonoma de Mexico, DF 04510 (Mexico)

2012-10-23T23:59:59.000Z

90

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume III - Appendix, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I Summary Report provides an executive summary and overview; Volume II Technical Report provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix contains detailed data from simulations for each of the counties included in the analysis.

Degelman, L.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Baltazar-Cervantes, J. C.; Liu, Z.; Ahmed, M.; Verdict, M.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Yazdani, B.; Culp, C.; Haberl, J. S.

2009-02-20T23:59:59.000Z

91

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II - Technical Report, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Degelman, L.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Baltazar-Cervantes, J. C.; Liu, Z.; Ahmed, M.; Verdict, M.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Yazdani, B.; Culp, C.; Haberl, J. S.

2007-08-01T23:59:59.000Z

92

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II--Technical Report, Annual Report to the Texas Commission on Environmental Quality January 2008-December 2008  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its seventh annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Haberl, Jeff; Culp, Charles; Yazdani, Bahman; Gilman, Don; Muns, Shirley; Liu, Zi; Baltazar, Juan-Carlos; Mukhopadhyay, Jaya; Degelman, Larry; Claridge, David

2009-12-01T23:59:59.000Z

93

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I - Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Verdict, M.; Baltazar-Cervantes, J. C.; Yazdani, B.; Ahmed, M.; Degelman, L.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Liu, Z.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Haberl, J. S.; Culp, C.

2008-01-23T23:59:59.000Z

94

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Volume I-Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2009-December 2009  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its eighth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Haberl, J.; Culp, C.; Yazdani, B.; Lewis, C.; Liu, Z.; Baltazar-Cervantes, J. C.; Mukhopadhyay, J.; Gilman, D.; Degelman, L.; McKelvey, K.; Claridge, D.

2010-12-01T23:59:59.000Z

95

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I--Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2008-December 2008  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its seventh annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Baltazar, Juan-Carlos; Claridge, David; Yazdani, Bahman; Mukhopadhyay, Jaya; Liu, Zi; Muns, Shirley; Gilman, Don; Degelman, Larry; Haberl, Jeff; Culp, Charles

2009-12-01T23:59:59.000Z

96

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Volume III- Technical Appendix, Annual Report to the Texas Commission on Environmental Quality, January 2009 December 2009  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its eighth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Haberl, J.; Culp, C.; Yazdani, B.; Liu, Z.; Baltazar-Cervantes, J. C.; Gilman, D.; Lewis, C.; McKelvey, K.; Mukhopadhyay, J.; Degelman, L.

2010-12-01T23:59:59.000Z

97

The Fenno-Skan HVDC link commissioning  

Science Conference Proceedings (OSTI)

The commissioning of the Fenno-Skan HVDC link between Finland and Sweden, with the longest submarine dc cable in the world, is described. The main pre-commissioning activities, important for an efficient commissioning, are discussed together with time schedules and suitable organization forms. The procedures to test special control features, such as subsynchronous oscillation (SSO) damping control are presented. The full scale network interaction tests which are an important part of the commissioning are also discussed. These tests succeeded very well and provided a lot of information about the system behavior for future operation and planning purposes.

Nyman, A. (Swedish State Power Board, Vaellingby (Sweden)); Jaeaeskelaeinen, K.; Vaitomaa, M. (Imatran Voima OY, Vantaa (Finland)); Jansson, B.; Danielsson, K.G. (ABB Power Systems, Ludvika (Sweden))

1994-01-01T23:59:59.000Z

98

Controller Design of Power Quality-Improving Appliances  

SciTech Connect

This paper presents an innovative solution to power quality problems -- using power quality improving (PQI) appliances to reduce harmonic currents and improve the power factor in buildings.

Hammerstrom, Donald J.; Zhou, Ning; Lu, Ning

2007-01-01T23:59:59.000Z

99

Coal quality control in the context of international standards ISO 9000-2000  

Science Conference Proceedings (OSTI)

The paper sets forth scientific foundations and organizational-technical environment offered by ISO 9000 standards that are oriented to product quality management and, thus, product quality planning. The authors describe the results of coal product quality planning with using the QFD methodology, present a model of coal quality control through the coal product life cycle and mining technologies. It is proposed to evaluate the quality management efficiency by the coefficient of concordance between the product quality and consumer's demands.

Freidina, E.V.; Botvinnik, A.A.; Dvornikova, A.N. [Russian Academy of Sciences, Novosibirsk (Russian Federation). Institute of Mining

2008-11-15T23:59:59.000Z

100

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning to someone by E-mail Share Federal Energy Management Program: Commissioning on Facebook Tweet about Federal Energy Management Program: Commissioning on Twitter...

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Existing Building Commissioning (EBCx) Project Considerations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Existing Building Existing Building Commissioning (EBCx) Project Considerations Phil Welker, Executive Director PECI 2 Mapping Out Your Commissioning Strategy Three big questions: 1. Which buildings are commissioning candidates? 2. What commissioning approach(es) should I employ? 3. What expertise do I need to get it done? 3 Which buildings? Many factors come in to play: * Building sizes * Project budgets * Current energy performance * Building control systems * Occupancy rates * Operator/ engineering resources * Long term investment strategy * Sustainability plans or mandates * Equipment Replacements Selecting the right buildings is critical to achieve the maximum benefit in a cost-efficient manner. See the EPA's "A Retrocommissioning Guide for Building Owners"

102

SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE  

Science Conference Proceedings (OSTI)

The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

Shishlo, Andrei P [ORNL; Galambos, John D [ORNL

2008-01-01T23:59:59.000Z

103

European Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Name European Commission Place Brussels, Belgium Website http://ec.europa.eu/index_en.h Coordinates 50.8503396°, 4.3517103° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8503396,"lon":4.3517103,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

104

Commissioning Aid and Decision Making Assistance Tool 'Implementation & Assessment' - Case Study  

E-Print Network (OSTI)

The precedent paper, published in ICEBO 2005 presented the approach and methodology for information flow management in the commissioning of low energy buildings. Within this methodology, commissioning and decision making are included in the low energy building design process with taking care of the efficiency of information flow. This methodology aims at increasing the probability to meet the required needs by including, in the entire building life cycle (design, construction, occupancy and maintenance), a quality control process such as commissioning. This paper presents two aspects. The first part describes the specifications of a tool box for commissioning and decision making aid that we are developing. This tool box applies our methodology in order to guarantee the efficiency of the design process. The seconde part shows how was the approach used to capitalise a reabilitation and construction of low energy buildings in Paris, France and Saint Pierre, Reunion, to validate our hypothesis, to develop and Assess our tool.

Belkadi-Hannachi, N.; Jandon, M.; Nejad, H. V.; Guena, F.; Diab, Y.

2006-01-01T23:59:59.000Z

105

A VAD-Based Dealiasing Method for Radar Velocity Data Quality Control  

Science Conference Proceedings (OSTI)

This paper describes a new velocityazimuth display (VAD)-based dealiasing method developed for automated radar radial velocity data quality control to satisfy the high-quality standard and efficiency required by operational radar data ...

Qin Xu; Kang Nai; Li Wei; Pengfei Zhang; Shun Liu; David Parrish

2011-01-01T23:59:59.000Z

106

Quality Controlling Surf Zone Acoustic Doppler Velocimeter Observations to Estimate the Turbulent Dissipation Rate  

Science Conference Proceedings (OSTI)

High-quality measurements of the turbulent dissipation rate ? are required to diagnose field surf-zone turbulence budgets. Quality control (QC) methods are presented for estimating surf zone ? with acoustic Doppler velocimeter (ADV) data. Bad ADV ...

Falk Feddersen

2010-12-01T23:59:59.000Z

107

Reduction of Middle-Atmospheric Forecast Bias through Improvement in Satellite Radiance Quality Control  

Science Conference Proceedings (OSTI)

This article discusses a practical problem faced in operational atmospheric forecasting and data assimilation, and efforts to improve forecast quality through the choice of quality control parameters. The need to utilize as much data as possible ...

Young-Joon Kim; William F. Campbell; Steven D. Swadley

2010-04-01T23:59:59.000Z

108

A Semiautomated Approach for Quality Controlling Large Historical Ocean Temperature Archives  

Science Conference Proceedings (OSTI)

This paper describes a method consisting of both automated statistical screening and manual quality control through expert visual inspection, which produces a historical ocean temperature archive of high qualitythat is, nearly all profiles are ...

Ann Gronell; Susan E. Wijffels

2008-06-01T23:59:59.000Z

109

Vermont Air Pollution Control Regulations, Ambient Air Quality Standards (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

The ambient air quality standards are based on the national ambient air quality standards. The Vermont standards are classified as primary and secondary standards and judged adequate to protect...

110

Ohio River Valley Water Sanitation Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Ohio River Valley Water Sanitation Commission (ORSANCO), was established on June 30, 1948 to control and abate pollution in the Ohio River Basin. ORSANCO is an interstate commission...

111

A new monitoring design for uni-variate statistical quality control charts  

Science Conference Proceedings (OSTI)

In this research, an iterative approach is employed to analyze and classify the states of uni-variate quality control systems. To do this, a measure (called the belief that process is in-control) is first defined and then an equation is developed to ... Keywords: Average run length, CUSUM chart, EWMA chart, Process monitoring, Statistical quality control

Mohammad Saber Fallah Nezhad; Seyed Taghi Akhavan Niaki

2010-03-01T23:59:59.000Z

112

Retro-Commissioning (RCx)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Retro-Commissioning (RCx) FUPWG Meeting 20 October, 2010 RCx In UESC Contracts  Put RCx in Delivery Orders  Clear Scope of Work  Specify kW per Ton on Completion  State the Current Condition of the Equipment  State the Expected Performance in the Delivery Orders and Get the Contractor to Agree Up-Front  Don't Hire a Contractor that has Never Done Commissioning  Hire a Commissioning Agent  This Can Be Expensive What We Do at SCE  We Commission Everything  We ReCommission Everything to Some Degree  San Bernardino Story Up Front  You must review and approve the construction scope, budget, and schedule including all RCx activities BEFORE work begins at site  Use Pre-Established Guidelines (FEMP

113

OpenEI - Commission  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm4360 en Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records http:en.openei.orgdatasetsnode471...

114

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Process Commissioning Process October 16, 2013 - 4:44pm Addthis The commissioning process is designed to verify that a renewable energy project meets specified agency design, performance, and operational requirements. To ensure that the level and focus of commissioning efforts are appropriate to the scope and complexity of the project, the commissioning planning process should begin at the same time as the design phase of the project. Integrating Commissioning Into the Design Process Developing a Detailed Commissioning Plan Testing Systems and Providing Commissioning Reports Performing Enhanced Commissioning Delivering Final Documentation Integrating Commissioning Into the Design Process The commissioning agent should attend design team meetings, review the

115

Magnetically Controlled Reactor Shrinks Power Quality Costs and...  

NLE Websites -- All DOE Office Websites (Extended Search)

ensures less than 2-3% main harmonic distortion even without special filters. Transformer-like construction ensures reliable operation. MCR's increase power quality through...

116

Quality Assurance Program Plan for FFTF effluent controls. Revision 1  

SciTech Connect

This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

Seamans, J.A.

1995-06-08T23:59:59.000Z

117

A Quality-Control Routine for Hourly Wind Observations  

Science Conference Proceedings (OSTI)

The quality of hourly wind speed and direction observations from 41 northeastern U.S. first-order weather stations is evaluated with regard to the recognition of individual observations that are either obviously in error or of suspect quality. An ...

Arthur T. DeGaetano

1997-04-01T23:59:59.000Z

118

The LHCB Commissioning  

E-Print Network (OSTI)

The LHCb experiment is dedicated to precision measurements of CP violation and rare decays of B hadrons at the Large Hadron Collider (LHC) at CERN. The LHCb installation has been finished in spring 2008 and an intensive testing and commissioning of the system has been started. An overview and the results from our commissioning activities are described.

Stefano de Capua; for the LHCb collaboration

2009-04-28T23:59:59.000Z

119

Commissioning for Federal Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

120

Commissioning for Federal Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Location-based services to control roller compaction quality for rock-fill dams  

Science Conference Proceedings (OSTI)

It is very important for rock-fill dams to carry out more accurately monitoring and remotely quality controlling in real time. Based on location based services, an integration platform, with the name of CRCQ-DAM, is proposed to control roller compaction ... Keywords: RTK, WebGIS, location-based services, rock-fill dams, roller compaction quality

Hao Wu; Qiankun Wang; Jiru Zhang; Qin Chen; Xupeng Wang

2009-09-01T23:59:59.000Z

122

Multifamily Quality Control Inspector Job/Task Analysis and Report: September 2013  

SciTech Connect

The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Quality Control Inspector JTA identifies and catalogs all of the tasks performed by multifamily quality control inspectors, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

Owens, C. M.

2013-09-01T23:59:59.000Z

123

Quality Control of Weather Data during Extreme Events  

Science Conference Proceedings (OSTI)

Quality assurance (QA) procedures have been automated to reduce the time and labor necessary to discover outliers in weather data. Measurements from neighboring stations are used in this study in a spatial regression test to provide preliminary ...

Jinsheng You; Kenneth G. Hubbard

2006-02-01T23:59:59.000Z

124

A Quality Control Program for Surface Mesometeorological Data  

Science Conference Proceedings (OSTI)

A program is described which has been used to verify the quality of surface mesonet data collected during the Cooperative Convective Precipitation Experiment (CCOPE). The CCOPE mesonet consisted of 123 automated stations from two mesonet systems ...

Charles G. Wade

1987-09-01T23:59:59.000Z

125

Quality Controls for Profiler Measurements of Winds and RASS Temperatures  

Science Conference Proceedings (OSTI)

A new method for estimating winds and radio acoustic sounding system temperatures from radar Doppler measurements for the new NOAA wind profilers is described. This method emphasizes the quality of 6-min measurements prior to the computation of ...

B. L. Weber; D. B. Wuertz; D. C. Welsh; R. McPeek

1993-08-01T23:59:59.000Z

126

Federal Energy Regulatory Commission fiscal year 1997 annual financial statements  

Science Conference Proceedings (OSTI)

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

NONE

1998-02-24T23:59:59.000Z

127

NUCLEAR REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 21, 1999 (Volume 64, Number 244)] December 21, 1999 (Volume 64, Number 244)] [Proposed Rules] [Page 71331-71333] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21de99-21] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: Nuclear Regulatory Commission. ACTION: Advance notice of proposed rulemaking. ----------------------------------------------------------------------- SUMMARY: The Nuclear Regulatory Commission (NRC) is considering an amendment to its regulations that would require NRC licensees to notify

128

Automated Demand Response and Commissioning  

E-Print Network (OSTI)

Conference on Building Commissioning: May 4-6, 2005 Motegi,National Conference on Building Commissioning: May 4-6, 2005Demand Response and Commissioning Mary Ann Piette, David S.

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

129

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2010 ELECTRICITY SUPPLY AND DEMAND OUTLOOK MAY Supply and Demand Outlook provides a summary of the California Energy Commission staff assessment. Summer 2010 Electricity Supply and Demand Outlook. California Energy Commission, Electricity Supply

130

Commissioning of energy-efficiency measures: Costs and benefits for 16 buildings  

SciTech Connect

Building systems and energy-efficiency measures (EEMs) often don`t perform as well in practice as expected at the design stage. This fact has become clear to many organizations concerned with ensuring building performance. What to do about these problems is less clear. Several electric utilities around the U.S. have begun to take action to address the start-up, control, and operational problems that are found in nearly every building. One of the most beneficial periods to intervene in the building life cycle is during the start-up phase of a now building. Building commissioning during start up is such an intervention. Commissioning can be defined as: a set of procedures, responsibilities, and methods to advance a system from static installation to full working order in accordance with design intent. In broad terms, commissioning can extend from design reviews through operations and maintenance planning and training. With such a broad scope aimed at the entire building life cycle, commissioning is often likened to {open_quotes}Total Quality Management{close_quotes} Yet the heart of commissioning are the procedures developed and executed to ensure that all building systems function as intended. The incorporation of energy-efficiency criteria into building commissioning is a new development.

Piette, M.A.; Nordman, B.; Greenberg, S.

1995-04-01T23:59:59.000Z

131

The California Sentencing Commission  

E-Print Network (OSTI)

The California Sentencing Commission: Laying the Groundwork Sponsored by The Stanford Executive alexander, Executive Vice President, California Correctional and Peace Officers Association Laura appleman Project, The Pew Charitable Trusts Joyce Hayhoe, Assistant Secretary, Office of Legislation, California

Ford, James

132

Codex Alimentarius Commission update  

Science Conference Proceedings (OSTI)

AOCS Technical Director Richard Cantrill attended recent meetings of two Codex Alimentarius Commission (Codex) committees that deal with issues of interest to the fats and oils industry. Topics discussed included work to update the standard on named vegeta

133

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.Spallation Neutron Source (SNS ** ) project a 402.5 MHz RFQR. Keller et al, Status of the SNS Font End Systems, Proc.

2002-01-01T23:59:59.000Z

134

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1994-03-01T23:59:59.000Z

135

EFCOG Best Practice Submission - Guidance for Retro-Commissioning  

Science Conference Proceedings (OSTI)

Commissioning is slowly becoming an accepted quality method for ensuring that buildings are designed, constructed, and operated as required by the building owner and as intended by the original design. Retro-commissioning is a process, using commissioning concepts, to ensure that existing buildings are operated and maintained as required by the owner to meet the buildings current mission. Retro-commissioning further seeks to incorporate new equipment and operating practices to upgrade existing facilities to obtain increased efficiency and employee comfort and productivity. Retro-commissioning practices are not universal. Best practices have been identified to assist Federal organizations with the development of retro-commissioning programs and to help DOE sites to begin this quality related process.

Ernest L. Fossum, CEM

2006-01-01T23:59:59.000Z

136

Chapter 9: Commissioning the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com- plexity of building systems constructed today, commis- sioning is necessary, but not automatically included as part of the typical design and contracting process. Commissioning is critical for ensuring that the building design is successfully constructed and operated.

137

Automated Demand Response and Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Commissioning Title Automated Demand Response and Commissioning Publication Type Conference Paper LBNL Report Number LBNL-57384 Year of Publication 2005 Authors Piette, Mary...

138

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

commissioning projects. Commissioning training is also available through FEMP. The on-demand training outlines processes to resolve operating problems, improve comfort,...

139

INITIAL COMMISSIONING OF NDCX-II  

E-Print Network (OSTI)

INITIAL COMMISSIONING OF NDCX-II* S. Lidia # , D. Arbelaez,the results of early commissioning studies that characterizeschematic and commissioning phases. The commissioning phases

Lidia, S.

2013-01-01T23:59:59.000Z

140

Commissioning of the ATLAS Liquid Argon Calorimeters  

Science Conference Proceedings (OSTI)

A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies is presented. It includes a coherent noise study, a measurement of the quality of the ionization pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

Cooke, Mark S. [Columbia University, New York, NY 10027 (United States)

2009-12-17T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Low-Emissions Exhaust Quality Control System to Optimize  

E-Print Network (OSTI)

Use (Absorption Chiller, Boiler, others) Exhaust control unit (ExECU) integrated with a prime mover (DG) and combined heat and power (CHP) systems or combined cooling heating and power (CCHP) systems this control technology to microturbines with absorption chillers. The project anticipates an improvement

142

The ManMachine Mix in Operational Product Quality Control and Verification at Fleet Numerical Oceanography Center  

Science Conference Proceedings (OSTI)

The Quality Control (QC) Division of the U.S. Navy's Fleet Numerical Oceanography Center (FNOC) is responsible for the quality control of meteorological and oceanographic analyses and forecasts issued to operational users, and for the ...

William M. Clune; Patrick A. Harr; L. Robin Brody

1992-06-01T23:59:59.000Z

143

Report of the international workshop on quality control of monthly climate data  

SciTech Connect

The National Climatic Data Center (NCDC), the US Department of Energy`s Carbon Dioxide Information Analysis Center, and the World Meteorological Organization (WMO) cosponsored an international quality control workshop for monthly climate data, October 5--6, 1993, at NCDC. About 40 scientists from around the world participated. The purpose of the meeting was to discuss and compare various quality control methods and to draft recommendations concerning the most successful systems. The near-term goal to improve quality control of CLIMAT messages for the NCDC/WMO publication Monthly Climatic Data for the World was sucessfully met. An electronic bulletin board was established to post errors and corrections. Improved communications among Global Telecommunication System hubs will be implemented. Advanced quality control algorithms were discussed and improvements were suggested. Further data exchanges were arranged.

Not Available

1993-12-31T23:59:59.000Z

144

A Solo-based automated quality control algorithm for airborne tail Doppler radar data  

Science Conference Proceedings (OSTI)

An automated quality control pre-processing algorithm for removing non-weather radar echoes in airborne Doppler radar data has been developed. This algorithm can significantly reduce the time and experience level required for interactive radar ...

Michael M. Bell; Wen-Chau Lee; Cory A. Wolff; Huaqing Cai

145

Two Years of Operational Comprehensive Hydrostatic Quality Control at the National Meteorological Center  

Science Conference Proceedings (OSTI)

A comprehensive hydrostatic quality control (CHQC) procedure for rawinsonde heights and temperatures was implemented into operational use at the National Meteorological Center (NMC) in December 1988. The CHQC uses a sophisticated decision-making ...

Lev S. Gandin; Lauren L. Morone; William G. Collins

1993-03-01T23:59:59.000Z

146

Quality Control of Accumulated Fields by Applying Spatial and Temporal Constraints  

Science Conference Proceedings (OSTI)

Accumulating gridded fields over time greatly magnifies the impact of impulse noise in the individual grids. A quality control method that takes advantage of spatial and temporal coherence can reduce the impact of such noise in accumulation grids. ...

Valliappa Lakshmanan; Madison Miller; Travis Smith

2013-04-01T23:59:59.000Z

147

Quality Control and Homogeneity of Precipitation Data in the Southwest of Europe  

Science Conference Proceedings (OSTI)

A quality control process involving outliers processing, homogenization, and interpolation has been applied to 95 monthly precipitation series in the Iberian Peninsula, southern France, and northern Africa during the period 18991989. A detailed ...

J. Fidel Gonzlez-Rouco; J. Luis Jimnez; Vicente Quesada; Francisco Valero

2001-03-01T23:59:59.000Z

148

Commissioning Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Team Commissioning Team Commissioning Team October 16, 2013 - 4:45pm Addthis Assembling a committed team is a critical part of the commissioning process for renewable energy projects. Members of the team vary based on the size, complexity, and funding mechanism used for the project at hand. The commissioning team lead is a commissioning agent, an independent agent representing the agency's interests. In addition to the commissioning agent, participants in the commissioning process can include the agency, operations and management (O&M) personnel, contractors, subcontractors, and the architectural and engineering (A&E) firm. The project energy lead should also be an active member of the commissioning team and work closely with the commissioning agent. Renewable energy projects often require a team of experts in specific

149

Regulatory Commission of Alaska | Open Energy Information  

Open Energy Info (EERE)

Regulatory Commission of Alaska Regulatory Commission of Alaska Jump to: navigation, search Logo: Regulatory Commission of Alaska Name Regulatory Commission of Alaska Address 701 West Eight Ave., Suite 300 Place Anchorage, Alaska Zip 99501-3469 Phone number 907-276-6222 Website http://rca.alaska.gov/RCAWeb/h Coordinates 61.2143463°, -149.8931523° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.2143463,"lon":-149.8931523,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

150

Federal Energy Regulatory Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Regulatory Commission Energy Regulatory Commission Jump to: navigation, search Logo: Federal Energy Regulatory Commission Name Federal Energy Regulatory Commission Address 888 First Street, N.E. Place Washington, District of Columbia Zip 20426 Phone number 1-866-208-3676 Website http://www.ferc.gov/contact-us Coordinates 38.90145°, -77.006248° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90145,"lon":-77.006248,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

151

Texas Historical Commission | Open Energy Information  

Open Energy Info (EERE)

Historical Commission Historical Commission Jump to: navigation, search Logo: Texas Historical Commission Name Texas Historical Commission Address 1511 Colorado St. Place Austin, Texas Zip 78701 Year founded 1953 Phone number 512.463.6100 Website http://www.thc.state.tx.us/ Coordinates 30.2779484°, -97.7403973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2779484,"lon":-97.7403973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

152

Nevada State Environmental Commission | Open Energy Information  

Open Energy Info (EERE)

Environmental Commission Environmental Commission Jump to: navigation, search Logo: Nevada State Environmental Commission Name Nevada State Environmental Commission Address 901 South Stewart Street, Suite 4001 Place Carson City, Nevada Zip 89701 Website http://www.sec.nv.gov/ Coordinates 39.1580849°, -119.7644949° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1580849,"lon":-119.7644949,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

153

ATF2 Commissioning  

Science Conference Proceedings (OSTI)

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

2009-10-30T23:59:59.000Z

154

Commissioning Guidance for ESPCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.2 7.2 Commissioning Guide Commissioning Guidance for ESPCs INTRODUCTION Federal facility managers are challenged daily with maintaining existing federal building stock that is energy inefficient, requires increasing operations and maintenance (O&M) expenses, and often does not achieve the building occupant comfort needed to maintain worker productivity. Additionally, they are faced with congressionally mandated requirements to reduce energy use and O&M expenses, with little capital funding. The Super ESPC program provides a procurement mechanism to allow agencies to acquire performance-based services to implement energy efficient equipment and systems that reduce energy use and O&M expenses through projects designed, installed, financed, and

155

ATLAS Muon Detector Commissioning  

E-Print Network (OSTI)

The ATLAS muon spectrometer consists of several major components: Monitored Drift Tubes (MDTs) for precision measurements in the bending plane of the muons, supplemented by Cathode Strip Chambers (CSC) in the high eta region; Resistive Plate Chambers (RPCs) and Thin Gap Chambers (TGCs) for trigger and second coordinate measurement in the barrel and endcap regions, respectively; an optical alignment system to track the relative positions of all chambers; and, finally, the world's largest air-core magnetic toroid system. We will describe the status and commissioning of the muon system with cosmic rays and plans for commissioning with early beams.

E. Diehl; for the ATLAS muon collaboration

2009-10-15T23:59:59.000Z

156

Commissioning: A Highly Cost-Effective Building Energy Management Strategy  

SciTech Connect

Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

Mills, Evan

2011-01-06T23:59:59.000Z

157

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO  

E-Print Network (OSTI)

Commission's system for tracking and verifying compliance with the RPS. Keywords biodiesel, biogas, biomass of biomass or biogas fuels. In addition, Section 399.12, Subdivision (g)(3), specifies that no electricity that uses a mix of natural gas and biogas injected into a gas transportation pipeline. Once WREGIS

158

Nuclear Regulatory Commission issuances  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-11-01T23:59:59.000Z

159

Engineering quality control of solar-powered intelligent water-saving irrigation  

Science Conference Proceedings (OSTI)

The development tendency of the agricultural irrigation technology is Automatic water-saving irrigation, powered by solar energy and achieved control purposes by moisture content monitoring techniques and the variable irrigation technology. In this paper, ... Keywords: intelligent, quality control, solar power, water-saving irrigation

Liu Xiaochu; Wu Hualong; Ling Jingpeng; Tao Jianhua; Yao Li

2010-03-01T23:59:59.000Z

160

Support planning and controlling of early quality assurance by combining expert judgment and defect data--a case study  

Science Conference Proceedings (OSTI)

Planning quality assurance (QA) activities in a systematic way and controlling their execution are challenging tasks for companies that develop software or software-intensive systems. Both require estimation capabilities regarding the effectiveness of ... Keywords: Defect content estimation, Hybrid prediction model, Quality assurance effectiveness, Quality management, Software quality assurance

Michael Kls; Haruka Nakao; Frank Elberzhager; Jrgen Mnch

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

New Forestry Commission District Office The new Forestry Commission  

E-Print Network (OSTI)

New Forestry Commission District Office The new Forestry Commission District office at Smithton in construction The Forestry Commission's District office at Smithton in Inverness, Scotland, covers the national fuel heating system has proved effective during the winter of 2009/10, one of the harshest in 40 years

162

HYTEST Phase I Facility Commissioning and Modeling  

DOE Green Energy (OSTI)

The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

2009-09-01T23:59:59.000Z

163

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

NONE

1996-04-01T23:59:59.000Z

164

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Manager Renewable Energy Office G. William Pennington Acting Deputy Director Efficiency and Renewable of how the Energy Commission's Renewable Energy Program is administered and outlines terms

165

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2012 ELECTRICITY SUPPLY ABSTRACT The Summer 2012 Electricity Supply and Demand Outlook is the California Energy and Demand Outlook. California Energy Commission, Electricity Supply Analysis Division. CEC-200

166

Water Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Quality Water Quality We protect water quality through stormwater control measures and an extensive network of monitoring wells and stations encompassing groundwater, surface...

167

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

168

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

169

TATE OF CALIFORNI ENERGY COMMISSION  

E-Print Network (OSTI)

of concentrator photovoltaic systems must provide acceptable evidence to the Energy Commission for each modelS TATE OF CALIFORNI A ENERGY COMMISSION Pete Wilson, Governor CALIFORNIA ENERGY COMMISSION January Charles Mizutani, Manager TECHNOLOGY EVALULATION OFFICE Nancy J. Deller, Deputy Director ENERGY TECHNOLOGY

170

Automated Continuous Commissioning of Commercial Buildings  

E-Print Network (OSTI)

Conference on Building Commissioning. San Francisco, CA. 17.Commercial Buildings Commissioning, LBNL- 56637, Nov. 2004.Automated Continuous Commissioning Tool GUI Screenshots from

Bailey, Trevor

2013-01-01T23:59:59.000Z

171

Commissioning of the ATLAS pixel detector  

E-Print Network (OSTI)

Commissioning of the ATLAS pixel detector Tobias GollingUniversity of California. Commissioning of the ATLAS pixelof the past and future commissioning activities of the ATLAS

Golling, Tobias; ATLAS Collaboration

2009-01-01T23:59:59.000Z

172

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

173

Colorado Ground Water Commission | Open Energy Information  

Open Energy Info (EERE)

Water Commission Jump to: navigation, search Name Colorado Ground Water Commission Place Colorado Website http:water.state.co.usgroun References Colorado Ground Water Commission...

174

Commissioning Specifications | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Specifications Specifications Commissioning Specifications October 16, 2013 - 4:44pm Addthis Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and performance testing procedures are typically included in the specifications to let contractors know what standards are required during the various testing phases involved throughout the commissioning process. Since renewable energy technologies are changing and developing rapidly, it is critical to have the commissioning specifications developed by a well-informed resource with up-to-date renewable energy expertise. This resource must also have a thorough understanding of how renewable energy

175

The Atomic Energy Commission By Alice Buck  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atomic Energy Atomic Energy Commission By Alice Buck July 1983 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction Almost a year after World War II ended, Congress established the United States Atomic Energy Commission to foster and control the peacetime development of atomic science and technology. Reflecting America's postwar optimism, Congress declared that atomic energy should be employed not only in the Nation's defense, but also to promote world peace, improve the public welfare, and strengthen free competition in private

176

California State Lands Commission | Open Energy Information  

Open Energy Info (EERE)

Lands Commission Lands Commission Jump to: navigation, search Name California State Lands Commission Address 100 Howe Ave., Suite 100 South Place Sacramento, California Zip 95825-8282 Phone number 916-574-1900 Website http://www.slc.ca.gov/ Coordinates 38.5653989°, -121.4075812° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5653989,"lon":-121.4075812,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

177

Illinois Commerce Commission | Open Energy Information  

Open Energy Info (EERE)

Commerce Commission Commerce Commission Jump to: navigation, search Name Illinois Commerce Commission Place Springfield, Illinois Zip 62701 Product Regulator of public utilities and transportation in Illinois. Coordinates 42.640925°, -88.413644° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.640925,"lon":-88.413644,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

178

Utah Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Utah Public Service Commission Utah Public Service Commission Name Utah Public Service Commission Address 160 East 300 South Place Salt Lake City, Utah Zip 84114 Phone number 801.530.6716 Website http://www.psc.utah.gov/index. Coordinates 40.7627771°, -111.8866213° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7627771,"lon":-111.8866213,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

179

Michigan Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search State Michigan Name Michigan Public Service Commission Address 6545 Mercantile Way, Suite 7 City, State Lansing, MI Zip 48911 Website http://www.michigan.gov/mpsc/ Coordinates 42.663692°, -84.535225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.663692,"lon":-84.535225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

180

Idaho Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Idaho Public Utilities Commission Address P.O. Box 83720 Place Boise, ID Zip 83720 Website http://www.puc.idaho.gov Coordinates 43.6175293°, -116.2003704° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.6175293,"lon":-116.2003704,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Hawaii Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Jump to: navigation, search Name Hawaii Public Utility Commission Address 465 South King Street #103 Place Honolulu, Hawaii Zip 96813 Coordinates 21.3053513°, -157.85857° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.3053513,"lon":-157.85857,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

182

Oregon Public Utility Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Oregon Public Utility Commission Address 550 Capitol Street N.E. Suite 215 Place Salem, Oregon Zip 97301-2551 Number of employees 51-200 Phone number 503-373-7394 Website http://www.oregon.gov/PUC/Page Coordinates 44.941989°, -123.025697° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.941989,"lon":-123.025697,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

183

Application of Statistical Quality Control Techniques to Detonator Fabrication: Feasibility Study  

SciTech Connect

A feasibility study was performed on the use of process control techniques which might reduce the need for a duplicate inspection by production inspection and quality control inspection. Two active detonator fabrication programs were selected for the study. Inspection areas accounting for the greatest percentage of total inspection costs were selected by applying "Pareto's Principle of Maldistribution." Data from these areas were then gathered and analyzed by a process capabiltiy study.

Jones, J. Frank

1971-05-20T23:59:59.000Z

184

Potential Benefits of Commissioning California Homes  

SciTech Connect

Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

2002-01-01T23:59:59.000Z

185

Potential Benefits of Commissioning California Homes  

SciTech Connect

Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

2002-01-01T23:59:59.000Z

186

Audit of the Savannah River Site's Quality Control Program for Groundwater Sampling, IG-0405  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 1997 0, 1997 MEMORANDUM FOR: THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Savannah River Site's Quality Control Program for Groundwater Sampling" BACKGROUND The Savannah River Site's groundwater remediation program was managed by the Department of Energy's (Department) management and operating contractor for the site, Westinghouse Savannah River Company (Westinghouse). One component of the remediation

187

Real-Time Wind Turbine Emulator Suitable for Power Quality and Dynamic Control Studies  

E-Print Network (OSTI)

1 Real-Time Wind Turbine Emulator Suitable for Power Quality and Dynamic Control Studies Dale S. L. Dolan, Student Member, IEEE, P. W. Lehn, Member IEEE Abstract-- Wind turbines are increasingly becoming-time Wind Turbine Emulator, which emulates the dynamic torque produced by an actual turbine has been

Lehn, Peter W.

188

Quality Control Algorithms for the Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Winds Database  

Science Conference Proceedings (OSTI)

This paper presents the process used by the Marshall Space Flight Center Natural Environments Branch (EV44) to quality control (QC) data from the Kennedy Space Centers 50-MHz Doppler radar wind profiler (DRWP) for use in vehicle wind loads and ...

Robert E. Barbr Jr.

2012-12-01T23:59:59.000Z

189

Real-Time Quality Control of Wave Observations in the North Sea  

Science Conference Proceedings (OSTI)

The use of ocean wave data in new data assimilation techniques prompted the development of a real-time quality control system for wave height and wave period observations. Over the North Sea, a relatively large number of wave observations, as ...

Mara Paula Etala; Gerrit Burgers

1994-12-01T23:59:59.000Z

190

ORIGINAL RESEARCH Health Behaviors and Quality of Life of Cancer Survivors in Massachusetts, 2006: Data Use for Comprehensive Cancer Control  

E-Print Network (OSTI)

Pierre S. Health behaviors and quality of life of cancer survivors in Massachusetts, 2006: data use for comprehensive cancer control. Prev Chronic Dis 2010;7(1).

Temeika L. Fairley; Phd Helen Hawk; Phd Snaltze Pierre; Peer Reviewed

2010-01-01T23:59:59.000Z

191

Methodologies for Determining Persistence of Commissioning Benefits  

E-Print Network (OSTI)

Studies on the persistence of commissioning benefits to date have used a variety of methods to evaluate this persistence. This paper proposes a consistent framework for describing and evaluating the persistence of commissioning benefits. It begins by splitting commissioning benefits into two broad categories: 1) benefits that inherently persist; and 2) benefits that may not persist. The study of persistence then considers only the benefits that may not persist. These benefits are critical, since the top five reasons cited for performing commissioning in both new buildings and existing buildings are benefits that may not persist. These benefits are then further divided into benefits that may be quantified and benefits that are generally difficult to quantify. This paper proposes that benefits that may be quantified should generally be evaluated for persistence using approaches that are already widely accepted and used for other purposes, with adaptations where needed. Specifically, it proposes that energy and water savings be evaluated using methods consistent with the International Performance Measurement and Verification Protocol (adapted with additional weather normalization), that comfort and indoor air quality improvements be evaluated using relevant standards, specifically ASHRAE Standard 55 and ASHRAE Standard 62, but goes further and proposes a methodology for economic quantification of these benefits as well. Finally, it is proposed that the persistence of measures whose benefit is difficult to quantify be evaluated simply by determining whether the measure is still in place or performing.

Claridge, D. E.

2006-01-01T23:59:59.000Z

192

Commissioning of the ATLAS Muon Spectrometer with Cosmic Rays  

E-Print Network (OSTI)

The ATLAS detector at the Large Hadron Collider has collected several hundred million cosmic ray events during 2008 and 2009. These data were used to commission the Muon Spectrometer and to study the performance of the trigger and tracking chambers, their alignment, the detector control system, the data acquisition and the analysis programs. We present the performance in the relevant parameters that determine the quality of the muon measurement. We discuss the single element efficiency, resolution and noise rates, the calibration method of the detector response and of the alignment system, the track reconstruction efficiency and the momentum measurement. The results show that the detector is close to the design performance and that the Muon Spectrometer is ready to detect muons produced in high energy proton-proton collisions.

The ATLAS Collaboration

2010-06-22T23:59:59.000Z

193

Commissioning a materials research laboratory  

DOE Green Energy (OSTI)

This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

SAVAGE,GERALD A.

2000-03-28T23:59:59.000Z

194

ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

' ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum responds to your TWX certain information on the above subject. the documentation necessary to answer your available due to the records disposal vailing at the time of release or From records that are available and from disc&ions with most familiar with the transfer operations, &have the current radiological conditibn of transferred property is adequate under present standards. The following tabulations follow the format suggested in your TWX and are grouped to an operations or contract r+ponsibility. A,I Ex-AEC Storage Sites - I r:/ National Stockpile Site '(NSS) and OperatEonal

195

Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

196

Commissioning ATLAS Trigger  

E-Print Network (OSTI)

The ATLAS experiment at the Large Hadron Collider (LHC) will face the challenge of efficiently selecting interesting candidate events in $pp$ collisions at 14 TeV centre-of-mass energy, whilst rejecting the enormous number of background events. Therefore it is equipped with a three level trigger system. The first level is is hardware based and uses coarse granularity calorimeter information and fast readout muon chambers. The second and third level triggers, which are software based, will need to reduce the first level trigger output rate of ~ 75 kHz to ~ 200 Hz written out to mass storage. The progress in commissioning of this system will be reviewed in this paper.

Tomasz Bold; for Atlas Tdaq

2008-10-20T23:59:59.000Z

197

Applying infrared thermography as a quality-control tool for the rapid  

NLE Websites -- All DOE Office Websites (Extended Search)

Applying infrared thermography as a quality-control tool for the rapid Applying infrared thermography as a quality-control tool for the rapid detection of polymer-electrolyte-membrane-fuel-cell catalyst-layer-thickness variations Title Applying infrared thermography as a quality-control tool for the rapid detection of polymer-electrolyte-membrane-fuel-cell catalyst-layer-thickness variations Publication Type Journal Article Year of Publication 2012 Authors Aieta, Niccolo V., Prodip K. Das, Andrew Perdue, Guido Bender, Andrew M. Herring, Adam Z. Weber, and Michael J. Ulsh Journal Journal of Power Sources Volume 211 Pagination 4 - 11 Date Published 8/2012 ISSN 03787753 Keywords catalyst layer, corrosion, defects, fuel cell, infrared thermography, manufacturing, pemfc, quality control Abstract As fuel cells become more prominent, new manufacturing and production methods are needed to enable increased volumes with high quality. One necessary component of this industrial growth will be the accurate measurement of the variability of a wide range of material properties during the manufacturing process. In this study, a method to detect defects in fuel cell catalyst layers is investigated through experiment and mathematical simulation. The method uses infrared thermography and direct-current electronic-excitation methods to detect variations in platinum-containing catalyst-layer thickness with high spatial and temporal resolution. Data analysis, operating-condition impacts, and detection limits are explored, showing the measurement of defects on the millimeter length scale. Overall, the experimental and modeling results demonstrate great potential of this technique as a nondestructive method to measure defects that is amenable to use on roll-to-roll manufacturing lines.

198

PRELIMINARY Run Shutdown BL Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

199

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

Readiness Review Team (BCRRT) 1. Purpose The APS Beamline Commissioning Readiness Review Team (BCRRT) reports to and advises the AES Associate Division Director for Mechanical and...

200

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

AES AES CCSM & BCRRT Chair J. Vacca AES RSO-Health Physicist W. VanWingeren AES AES Commissioning Coordinator Floor Coordinator AES Beamline Operations Support Beamline Staff...

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

A BEMS-Assisted Commissioning Tool to Improve the Energy Performance of HVAC Systems  

E-Print Network (OSTI)

The evolving capabilities of Building Energy Management Systems (BEMS) offer new opportunities to automate some parts of the commissioning process and can generate benefits over the entire life of a building. These benefits include a reduction of process cost and manual effort on site, improved quality assurance process and the adoption of automated energy audit capabilities to improve overall building performance. This paper presents the concept for a new automated commissioning tool that verifies and optimizes the performance of building HVAC systems using the capabilities of BEMS. The tool is applicable mainly to commercial and institutional buildings. In its simplest form, the tool monitors building control data and stores it in a structured database to be used online or upon request. Data resulting from standardized test procedures invoked manually or automatically are also stored in the database. A reasoning algorithm performs an intelligent analysis of the monitored data and also performs additional automated commissioning of HVAC components and systems, identifying faults, diagnosing them, and evaluating the potential energy efficiency improvements. The process is completed by sending detailed comprehensive reports to the user. This paper also includes an example showing how an automated BEMS-assisted commissioning tool can potentially be applied to improve the energy performance of variable-air-volume fan systems.

Choiniere, D.; Corsi, M.

2003-01-01T23:59:59.000Z

202

Report of the Review of the Hanford Solid Waste Environmental Impact Statement regarding Data Quality Control and Management Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of the Hanford Review of the Hanford Solid Waste Environmental Impact Statement (EIS) Data Quality, Control and Management Issues January 2006 Hanford Solid Waste Environment Impact Statement (EIS) Data Quality, Control and Management Issues Review Report ii Contents EXECUTIVE SUMMARY .................................................................................. IV 1.0 BACKGROUND ................................................................................................................ 1 2.0 REVIEW APPROACH....................................................................................................... 1 3.0 SUMMARY........................................................................................................................ 2 4.0 REVIEW RESULTS........................................................................................................... 4

203

Experiences on the Implementation of the 'Energy Balance' Methodology as a Data Quality Control Tool: Application to the Building Energy Consumption of a Large University Campus  

E-Print Network (OSTI)

As the energy costs have been increasing the more energy efficient measures have been promoted in the buildings sector, the reliability of energy consumption data has been attracting significant attention. For example, the reliability of the determination of energy savings depends on that of the energy consumption data, which has to be verified before and after any efficiency measure is applied. From other perspective, verifying energy use data on a regular basis would allow the engineers to identify and assess commissioning opportunities confidently. This paper presents the application of an innovative data screening methodology as a data quality control tool for energy consumption data. The methodology has been applied to a large university campus where the monthly energy consumption, of approximately 100 buildings, must be verified. One of the main responsibilities of the Energy Management Office of the university is to provide monthly utility consumption and cost information to accounting for utility billing of individual buildings. The methodology, which is based on the first law of thermodynamics, or energy conservation, has proved to be an effective data quality screening method for verification of metering sensors when heating, cooling and electricity consumption are separately metered in a building. The methodology is anticipated to be suitable for automated application. In some cases, the methodology could also help to rehabilitate energy use data.

Baltazar-Cervantes, J. C.; Sakurai, Y.; Masuda, H.; Feinauer, D.; Liu, J.; Ji, J.; Claridge, D. E.; Deng, S.; Bruner, H.

2007-01-01T23:59:59.000Z

204

Commissioning Residential Ventilation Systems: A Combined Assessment of  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Residential Ventilation Systems: A Combined Assessment of Commissioning Residential Ventilation Systems: A Combined Assessment of Energy and Air Quality Potential Values Title Commissioning Residential Ventilation Systems: A Combined Assessment of Energy and Air Quality Potential Values Publication Type Report LBNL Report Number LBNL-5969E Year of Publication 2012 Authors Turner, William J. N., Jennifer M. Logue, and Craig P. Wray Date Published 07/2012 Keywords commissioning, energy, health, indoor air quality, residential, valuation, ventilation Abstract Due to changes in building codes, whole-house mechanical ventilation systems are being installed in new California homes. Few measurements are available, but the limited data suggest that these systems don't always perform as code and forecasts predict. Such deficiencies occur because systems are usually field assembled without design specifications, and there is no consistent process to identify and correct problems. The value of such activities in terms of reducing energy use and improving indoor air quality (IAQ) is poorly understood. Commissioning such systems when they are installed or during subsequent building retrofits is a step towards eliminating deficiencies and optimizing the tradeoff between energy use and IAQ.

205

Quality control of solar radiation data within the RMIB solar measurements network  

Science Conference Proceedings (OSTI)

Assessment of the solar resource is based upon measured data, where available. However, with any measurement there exist errors. Consequently, solar radiation data do not exhibit necessarily the same reliability and it often happens that users face time series of measurements containing questionable values though preliminary technical control has been done before the data release. To overcome such a situation, a major effort has been undertaken at the Royal Meteorological Institute of Belgium (RMIB) to develop procedures and software for performing post-measurement quality control of solar data from the radiometric stations of our in situ solar monitoring network. Moreover, because solar energy applications usually need continuous time series of solar radiation data, additional procedures have also been established to fill missing values (data initially lacking or removed via quality checks). (author)

Journee, Michel; Bertrand, Cedric [Royal Meteorological Institute of Belgium, Avenue Circulaire 3, B-1180 Brussels (Belgium)

2011-01-15T23:59:59.000Z

206

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fifth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

207

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Sixth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

208

The Use of Photochemical Air Quality Models for Evaluating Emission Control Strategies: A Synthesis Report  

Science Conference Proceedings (OSTI)

This report outlines conditions under which gridded photochemical air quality models are legitimate tools for determining the types of emission controls (VOC, NOx, or both) that would be most effective for reducing ozone concentration. In doing so, it emphasizes that models should not be used indiscriminately by pointing out their limitations and the resulting consequences. It also suggests ways to make models made more suitable for regulatory purposes by formulating results probabilistically.

1993-02-18T23:59:59.000Z

209

File:Colorado Water Quality Control Act.pdf | Open Energy Information  

Open Energy Info (EERE)

Water Quality Control Act.pdf Water Quality Control Act.pdf Jump to: navigation, search File File history File usage Metadata File:Colorado Water Quality Control Act.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 413 KB, MIME type: application/pdf, 69 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:23, 14 March 2013 Thumbnail for version as of 14:23, 14 March 2013 1,275 × 1,650, 69 pages (413 KB) Alevine (Talk | contribs)

210

International Electrotechnical Commission IEC 61850 Substation Development  

Science Conference Proceedings (OSTI)

The International Electrotechnical Commission Standard IEC 61580 is an emerging standard for advanced utility automation that provides a rich, hierarchical data and behavior model for use in sophisticated substation control and protection equipment. One of the important features introduced by IEC 61850 is the replacement of the wires used to exchange binary and analog information between Intelligent Electronic Devices (IEDs) with communication messages. In a conventional substation, the substation engine...

2009-03-25T23:59:59.000Z

211

Federal Energy Management Program: Commissioning Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Commissioning Process to someone by E-mail Share Federal Energy Management Program: Commissioning Process on Facebook Tweet about Federal Energy Management Program: Commissioning Process on Twitter Bookmark Federal Energy Management Program: Commissioning Process on Google Bookmark Federal Energy Management Program: Commissioning Process on Delicious Rank Federal Energy Management Program: Commissioning Process on Digg Find More places to share Federal Energy Management Program: Commissioning Process on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Types Process Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases

212

Japanese Vision of Commissioning Process and Asian View  

E-Print Network (OSTI)

Building Services Commissioning Association, BSCA, has been established in Japan as an NPO in order to propagate the building commissioning, especially HVAC commissioning, process among building and building services construction and maintenance society in Japan. As most engineers have not been so happy as the minimum initial cost policy used to goes first without clear definition of performance on environmental quality and energy efficiency, commissioning concept, after seven years of discussions in SHASE and IEA/ECBCS/Annex-40 shadow committee and others, has become popular and recognized as one of the most important process to be introduced, if only building owners and public sectors concerning building construction, energy conservation and environmental preservation come to understand true value of it. In Hong Kong the Commissioning Center was established in 2002 affiliated with the Hong Kong Institute of Vocational Education and with from short to long term training programs how to propagate the process and bring up commissioning engineers. In Mainland China and Korea commissioning process is not well recognized yet except in a sense of performance diagnostics and fault detections.

Nakahara, N.

2004-01-01T23:59:59.000Z

213

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BEFORE THE BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) MOTION FOR LEAVE TO ANSWER AND ANSWER OF POTOMAC ELECTRIC POWER COMPANY Pursuant to Rule 213 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213, Potomac Electric Power Company ("Pepco") hereby moves for leave to answer and answers the Motion for Leave to File Consolidated Answer and Consolidated Answer of Robert G. Burnley, Director of the Commonwealth of Virginia Department of Environmental Quality filed on November 10, 2005 ("VDEQ Answer"). For the reasons detailed below, Pepco requests that the Commission reject VDEQ's Answer, or in the alternative, if the

214

Embedded Commissioning for Building Design  

E-Print Network (OSTI)

Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning as a building delivery embedded process that persistently verifies and validates design intent throughout the building lifecycle process. In the building lifecycle approach, buildings are considered to have cradle-to-grave life spans. They are modeled through a variety of different developmental phases. In this research project, we intend to build the necessary theory and tools to support the embedded commissioning process as a co-function of building lifecycle.

Akin, O.; Turkaslan-Bulbul, M. T.; Gursel, I.; Garrett, J. H.; Akinci, B.; Wang, H.

2004-01-01T23:59:59.000Z

215

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

on eligibility of hydroelectric and fuel cell facilities, respectively). The Energy Commission recognizesCalifornia Energy Commission STAFF REPORT RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Draft Staff Guidebook Fourth Edition AUGUST 2010 CEC3002010007SD #12;CALIFORNIA ENERGY COMMISSION Kate Zocchetti

216

u. S. Atomic Energy Commission  

Office of Legacy Management (LM)

October 31, 1949 Manager of Operations u. S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J....

217

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

: Solazyme, Incorporated, "Development of Pilot Production Plants for Soladiesel RD Utilizing) Renewable Diesel Solazyme, Inc. In Progress Non-Attainment (All) Source: Energy Commission staff analysis as a high percentage of sensitive populations. #12;2 Project Name Solazyme, Incorporated

218

TATE OF CALIFORNI NERGY COMMISSION  

E-Print Network (OSTI)

and Wildlife), Blaine Parker (Columbia River Inter-Tribal Fish Commission) and Brad James (Washington and on sturgeon passage at Columbia River hydroelectric dams. The presentation will review progress

219

Water Control and Improvement Districts (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Control and Improvement Districts (Texas) Water Control and Improvement Districts (Texas) Water Control and Improvement Districts (Texas) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Solar Wind Program Info State Texas Program Type Environmental Regulations Provider Texas Commission on Environmental Quality The Texas Commission on Environmental Quality is authorized to review and

220

Commissioning of the HELIOS spectrometer.  

Science Conference Proceedings (OSTI)

This paper describes the implementation and commissioning of a device based on a new concept for measurements of nuclear reactions in inverse kinematics. The HELIcal Orbit Spectrometer, HELIOS, was commissioned at Argonne National Laboratory by studying the {sup 28}Si(d,p){sup 29}Si reaction in inverse kinematics. This experiment served as a proof of principle for this previously untested concept, and was used to verify the response and performance characteristics of HELIOS.

Lighthall, J. C.; Back, B. B.; Baker, S. I.; Freeman, S. J.; Lee, H. Y.; Kay, B. P.; Marley, S. T.; Rehm, K. E.; Rohrer, J. E.; Schiffer, J. P.; Shetty, D. V.; Vann, A. W.; Winkelbauer, J. R.; Wuosmaa, A. H.; Physics; Western Michigan Univ.; Univ. of Manchester

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Wisconsin SRF Electron Gun Commissioning  

SciTech Connect

The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

Bisognano, Joseph J. [University of Wisconsin-Madison; Bissen, M. [University of Wisconsin-Madison; Bosch, R. [University of Wisconsin-Madison; Efremov, M. [University of Wisconsin-Madison; Eisert, D. [University of Wisconsin-Madison; Fisher, M. [University of Wisconsin-Madison; Green, M. [University of Wisconsin-Madison; Jacobs, K. [University of Wisconsin-Madison; Keil, R. [University of Wisconsin-Madison; Kleman, K. [University of Wisconsin-Madison; Rogers, G. [University of Wisconsin-Madison; Severson, M. [University of Wisconsin-Madison; Yavuz, D. D. [University of Wisconsin-Madison; Legg, Robert A. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curtis [JLAB; Plawski, Tomasz [JLAB; Powers, Thomas J. [JLAB

2013-12-01T23:59:59.000Z

222

Commissioning: A Highly Cost-Effective Building Energy Management Strategy  

E-Print Network (OSTI)

Commissioning: A Highly Cost-Effective Building Energypractice of building commissioning is a particularly potentefficiency. Although commissioning has earned increased

Mills, Evan

2012-01-01T23:59:59.000Z

223

Commissioning/ verification : Daylighting The New York Times Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning/ verification Commissioning/ verification Overview The architectural approach The owner's approach Daylighting field study Daylighting control systems Automated roller shades Procurement specifications Shades and Shade Controls Lighting Controls Visualizing daylight Commissioning/ verification Demand response Mainstream solutions Post-occupancy evaluation Publications Sponsors Project team Commissioning/ verification The construction cycle of the building life cycle is the time when the design intent is translated into a physical reality. Given novel integrated systems with which contractors (vendors, installers, commissioning (Cx) agents, etc.) do not have much experience, there is a risk that carefully laid plans will go amiss. To insure that the automated shading and daylighting control systems were installed and operating as intended, the manufacturers, LBNL, and the Times Company developed procedures to commission and verify system performance. With verification data resulting from these procedures, the Times Company possessed the unique capability to measure and compare performance to design intent then discuss and tune system performance with the manufacturer prior to closure of the work scope and occupancy of the building.

224

California Coastal Commission | Open Energy Information  

Open Energy Info (EERE)

Logo: California Coastal Commission Name California Coastal Commission Address 45 Fremont Street, Suite 2000 Place San Francisco, California Zip 94105-2219 Phone number 415-904-5400 Website http://www.coastal.ca.gov/ Coordinates 37.7912419°, -122.397133° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7912419,"lon":-122.397133,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

225

Automatic Commissioning of Multiple VAV Terminals  

E-Print Network (OSTI)

A site survey on a modern operating commercial building screened 261 ineffective VAV (Variable Air Volume) boxes (20.9% of the total boxes in the building) and summarized ten typical faults for VAV air-conditioning system(s) resulting in energy waste, performance degradation or totally out of control. A strategy is developed to automatically check the health condition of VAV terminals and diagnose the faults. Hybrid approach is employed to establish a commissioning and re-commissioning tool of VAV air-conditioning system. Performance indices with expert rules based on system physical characteristics are adopted to detect and diagnose the nine of the ten faults. PCA (Principal Component Analysis) method is developed to detect and diagnose the VAV box flow sensor bias (Fault 10) and to reconstruct the faulty sensors. A multiple VAV fault FDD strategy for a VAV entire system is developed, which is validated in simulation and filed tests.

Qin, J.; Wang, S.

2004-01-01T23:59:59.000Z

226

Colorado Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 1560 Broadway, Suite 250 Place Denver, Colorado Zip 80202 Phone number (303) 894-2000 Coordinates 39.7415017°, -104.9866578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7415017,"lon":-104.9866578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

227

California Energy Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Commission Energy Commission Address 1516 Ninth Street, MS-29 Place Sacramento, CA Zip 95814-5512 Website http://www.energy.ca.gov Coordinates 40.97989806962°, -94.21875° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.97989806962,"lon":-94.21875,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

228

Railroad Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Logo: Railroad Commission of Texas Name Railroad Commission of Texas Address 1701 N. Congress Place Austin, Texas Zip 78701 Year founded 1891 Phone number (512) 463-7158 Website http://www.rrc.state.tx.us/ Coordinates 30.2790636°, -97.7382267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2790636,"lon":-97.7382267,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

229

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002, IG-0569 THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002,...

230

Types of Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Types of Commissioning Types of Commissioning Types of Commissioning October 7, 2013 - 9:17am Addthis Several commissioning types exist to address the specific needs of equipment and systems across both new and existing buildings. The following commissioning types provide a good overview. New Building Commissioning New building commissioning happens during the design and construction of new facilities. The process ensures that systems and equipment in new buildings operate properly. This is done through design reviews, functional testing, system documentation, and operator training. Federal agencies should consider new building commissioning when building new facilities or undergoing major facility renovations. The process is best implemented through all phases of construction.

231

Potential Benefits of Commissioning California Homes  

NLE Websites -- All DOE Office Websites (Extended Search)

Potential Benefits of Commissioning California Homes Title Potential Benefits of Commissioning California Homes Publication Type Report LBNL Report Number LBNL-48258 Year of...

232

Federal Energy Management Program: Types of Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

of Commissioning to someone by E-mail Share Federal Energy Management Program: Types of Commissioning on Facebook Tweet about Federal Energy Management Program: Types of...

233

Residential Commissioning: A Review of Related Literature  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commissioning: A Review of Related Literature Title Residential Commissioning: A Review of Related Literature Publication Type Report LBNL Report Number LBNL-44535 Year...

234

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and...

235

The Persistence of Savings Obtained from Commissioning of Existing Buildings  

E-Print Network (OSTI)

The objective of this study is to investigate the reasons why the performance of mechanical systems degrades over time after commissioning and to recommend intervals at which testing should be performed to maintain the integrity of the commissioning process. The initial phase of this study investigated the energy savings in ten buildings commissioned between 1996 and 1997. The results of this study show that hot water, chilled water and electric savings have all degraded. Aggregate annual cost savings for the ten buildings decreased by 17% from 1998 to 2000 from $1,192,884 to $985,626. The investigation has found that the decreased savings are due to numerous changes in control settings since the commissioning and to significant control malfunctions in two buildings.

Cho, Sool Yeon

2008-06-10T23:59:59.000Z

236

Method of controlling coherent synchroton radiation-driven degradation of beam quality during bunch length compression  

DOE Patents (OSTI)

A method of avoiding CSR induced beam quality defects in free electron laser operation by a) controlling the rate of compression and b) using a novel means of integrating the compression with the remainder of the transport system: both are accomplished by means of dispersion modulation. A large dispersion is created in the penultimate dipole magnet of the compression region leading to rapid compression; this large dispersion is demagnified and dispersion suppression performed in a final small dipole. As a result, the bunch is short for only a small angular extent of the transport, and the resulting CSR excitation is small.

Douglas, David R. (Newport News, VA); Tennant, Christopher D. (Williamsburg, VA)

2012-07-10T23:59:59.000Z

237

Quality Control of Pavements and Tarmacs Using ({sup 137}Cs){gamma} Compton Scattering  

Science Conference Proceedings (OSTI)

The {gamma} Compton scattering over a volume of concrete has been studied in order to design an instrument for density measurements. It will be used for the quality control in road construction, where large surfaces must be monitored. The experimental results and Monte Carlo simulations of the {gamma} Compton scattering over homogeneous and inhomogeneous volumes of concrete are shown. MC simulations have been useful to optimize the values of several parameters to improve the experimental set up and to estimate the extension of the explored volume.

Pino, F.; Barros, H.; Bernal, M.; Sajo-Bohus, L.; Palacios, D.; Greaves, E. D.; Viesti, G. [Nuclear Physics Laboratory, Simon Bolivar University, Caracas (Venezuela, Bolivarian Republic of)

2010-08-04T23:59:59.000Z

238

A Two-Stage Quality Control Method for 2-m Temperature Observations Using Biweight Means and a Progressive EOF Analysis  

Science Conference Proceedings (OSTI)

The relatively smooth terrain embedded in the numerical model creates an elevation difference against the actual terrain, which in turn makes the quality control of 2-m temperature difficult when forecast or analysis fields are utilized in the ...

Zhifang Xu; Yi Wang; Guangzhou Fan

2013-02-01T23:59:59.000Z

239

California Energy Commission Library Recent Acquisitions July September 2012  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions July ­ September 2012 Climate of California Press Year: 2011 Call number: 339.2/C457 Clean tech nation: how the U.S. can lead in the new: Plantech Year: 2010 Call number: 344.7940/O58/2010 #12;California Environmental Quality Act: CEQA

240

Quality assurance plan for the High Level Controller for the CBMS Block II  

Science Conference Proceedings (OSTI)

This document establishes the software Quality Assurance Plan (QAP) for the High Level Controller for the Chemical and Biological Mass Spectrometer Block II (HLC/CBMS-II) project activities under the Computing, Robotics, and Education (CRE) Directorate management. It defines the requirements and assigns responsibilities for ensuring, with a high degree of confidence, that project objectives will be achieved as planned. The CBMS Program was awarded to ORNL by the US Army Chemical and Biological Defense command, Aberdeen Proving Ground, Maryland, to design the next version (Block II) mass spectrometer for the detection and identification of chemical and biological warfare agents, to fabricate four engineering prototypes, and to construct eight preproduction units. Section 1 of this document provides an introduction to the HLC/CBMS-II project QAP. Sections 2 and 3 describe the specific aspects of quality assurance as applicable to the project. Section 4 reviews the project approach to risk management. The Risk Management Matrix given in Appendix A is a tool to assess, prioritize, and prevent problems before they occur; therefore, the matrix will be reviewed and revised on a periodic basis. Appendix B shows the quality assurance criteria of the DOE Order 5700.6C and their applicability to this project.

Reid, R.W.; Robbins, I.F.; Stewart, K.A.; Terry, C.L.; Whitaker, R.A.; Wolf, D.A.; Zager, J.C.

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Quality control of chemical and isotopic analyses of geothermal water samples  

DOE Green Energy (OSTI)

Chemical and isotopic analyses of geothermal water samples must meet certain levels of accuracy and reliability to be useful for identifying geochemical processes in hydrothermal systems. Quality control is largely a concern for the analytical laboratory, but the geochemist or reservoir engineer using the chemical data must also be concerned with analytical quality. To test accuracy and reliability of analyses available from laboratories, splits of seven water samples were sent to four stable-isotope laboratories, and splits of five water samples were sent to four chemical laboratories. The analyses of each sample were compared among laboratories, and the differences in analyses were evaluated using criteria developed for this comparison. Isotopic compositions were considered reliable if they deviated from mean values by less than 2{per_thousand}, for hydrogen and by less than 0.15{per_thousand}, for oxygen. Concentrations of each chemical component were considered reliable if they differed from mean values by less than 10%. Chemical analyses were examined for internal consistency by calculating the error in ionic charge balance and the error between ionic charge and electrical conductivity. To be considered internally consistent, chemical analyses must have less than 5% error in charge balance and less than 10% error in conductivity balance. Three isotope laboratories gave consistent compositions of all samples. No chemical laboratory gave consistent analyses of all samples. Recommendations are made that provide the user of isotopic and chemical data with the ability to better evaluate the quality of analyses.

Reed, Marshall J.; Mariner, Robert H.

1991-01-01T23:59:59.000Z

242

Control strategies for mitigation of oil-shale-related-water quality concerns  

SciTech Connect

A comprehensive study of in situ retorting at the Logan Wash has indicated the importance of developing baseline information including raw shale characterization, the elucidation of mineralogical and chemical controls on trace element mobilities from shales subjected to in situ processing, and the research necessary to identify strategies for control of recognized environmental impacts. It is impossible to assess the magnitude of trace element releases to be expected from a commercial in situ facility once banks of retorts or the entire facility is abandoned and dewatering of the area is concluded. However, laboratory-scale studies can indeed identify the relative environmental acceptability of spent shale materials generated by in situ processing. In this research, an attempt was made to relate mineralogy and leaching behavior of field-generated materials with leachate composition and solution chemical processes. The interaction of these factors will ultimately affect the impact of in situ processing on surface and groundwater quality.

Peterson, E.J.; Wagner, P.

1981-01-01T23:59:59.000Z

243

Practical Diagnostics for Evaluating Residential Commissioning Metrics  

SciTech Connect

In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

2002-06-11T23:59:59.000Z

244

Federal Energy Regulation Commission Issues Smart Grid ...  

Science Conference Proceedings (OSTI)

Federal Energy Regulation Commission Issues Smart Grid Policy Statement. For Immediate Release: July 17, 2009. ...

2012-06-04T23:59:59.000Z

245

Commissioning Building Systems for Improved Energy ...  

Science Conference Proceedings (OSTI)

Commissioning Building Systems for Improved Energy Performance Project. Summary: NIST will advance commercial building ...

2012-12-17T23:59:59.000Z

246

What's Up with the California Commissioning Collaborative?  

NLE Websites -- All DOE Office Websites (Extended Search)

What's Up with the California Commissioning Collaborative? What's Up with the California Commissioning Collaborative? Speaker(s): Kristin Heinemeier Date: July 8, 2005 - 12:00pm Location: Bldg. 90 The California Commissioning Collaborative's objectives are: --to improve building performance by developing and promoting viable building commissioning practices in California; --to facilitate the development of cost effective programs, tools, techniques and service delivery infrastructure to enable the implementation of building commissioning processes; --to educate and inform concerning building commissioning processes; and --to identify opportunities, establish priorities and promote solutions relating to building commissioning processes in California. Find out about who the CCC is, and their latest activities,

247

EUROPEAN COMMISSION Integrated Pollution Prevention and Control  

E-Print Network (OSTI)

-intensive or faster fiber carbonization processes, such as microwave or plasma processing. In addition to improved: Hydrogen production system based on centralized biomass gasification technology producing hydrogen

Columbia University

248

Public Utilities Commission of Nevada | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission of Nevada Public Utilities Commission of Nevada Jump to: navigation, search Logo: Nevada Public Utilities Commission Name Nevada Public Utilities Commission Address 1150 East William St. Place Carson City, Nevada Zip 89701 Phone number 775-684-6110 Website http://pucweb1.state.nv.us/puc Coordinates 39.1707502°, -119.75655° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1707502,"lon":-119.75655,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

249

Arizona Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Commission Oil and Gas Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission State Arizona Name Arizona Oil and Gas Commission Address 416 W. Congress Street, Suite 100 City, State Tucson, Arizona Zip 85701 Website http://www.azogcc.az.gov/ Coordinates 32.221642°, -110.977439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.221642,"lon":-110.977439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

250

Alaska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Conservation Commission Conservation Commission Jump to: navigation, search Logo: Alaska Oil and Gas Conservation Commission State Alaska Name Alaska Oil and Gas Conservation Commission Address 333 W. 7th Ave., Ste. 100 City, State Anchorage, Alaska Zip 9950 Website http://doa.alaska.gov/ogc/ Coordinates 61.215808°, -149.8889769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.215808,"lon":-149.8889769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

251

A Case Study of Retro-Commissioning using Building 90  

NLE Websites -- All DOE Office Websites (Extended Search)

A Case Study of Retro-Commissioning using Building 90 A Case Study of Retro-Commissioning using Building 90 Speaker(s): Liping Wang Date: June 16, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Philip Haves The performance of HVAC systems may fail to satisfy design expectations due to equipment degradations, incorrect control sequences or sensor failures. Retro-commissioning identifies and implements cost-effective operational and maintenance improvements in existing buildings to bring the buildings up to the design intents. In this study, Building 90 at LBNL is used as a case study to demonstrate the processes of retro-commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening process at the whole building level. The building benchmarking results indicated a large energy saving potential for gas

252

Public Utility Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Commission of Texas Commission of Texas Jump to: navigation, search Logo: Public Utility Commission of Texas Name Public Utility Commission of Texas Address 1701 N. Congress Avenue Place Austin, Texas Zip 78701 Year founded 1975 Website http://www.puc.texas.gov/ Coordinates 30.2787191°, -97.7388076° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2787191,"lon":-97.7388076,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

253

Commissioning of the ATLAS Experiment  

E-Print Network (OSTI)

The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The sub-detector integration in recent milestone weeks is described. Cosmic commissioning in milestone week M6 included simultaneous data-taking and combined track analysis of the muon detector and inner detector, as well as combined analysis of muon detector and muon trigger. The calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The high-level-trigger infrastructure is being installed and algorithms tested in technical runs.

Juergen Thomas; for the ATLAS Collaboration at CERN

2008-08-07T23:59:59.000Z

254

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

255

California Energy Commission Apply Today!  

E-Print Network (OSTI)

photovoltaic project in the future. Peak Demand Savings: 95 kW Energy Savings: 1,510,849 kWh Annual Energy CostCalifornia Energy Commission Apply Today! "The College implemented all of the recommended projects Programs Office (916) 654-4147 pubprog@energy.state.ca.us "CEC financing allowed us to install many

256

California Energy Commission STAFF DRAFT  

E-Print Network (OSTI)

efficiency small engined cars, hybrid cars, biofuels and a significant switch to public transport. Tough) and to diesel and biofuels for cars. It is the aim of the European Commission that the EU ETS scheme under stable market conditions. Current volatility in wholesale electricity markets works against

257

Experience-Based Quality Control of Clinical Intensity-Modulated Radiotherapy Planning  

Science Conference Proceedings (OSTI)

Purpose: To incorporate a quality control tool, according to previous planning experience and patient-specific anatomic information, into the intensity-modulated radiotherapy (IMRT) plan generation process and to determine whether the tool improved treatment plan quality. Methods and Materials: A retrospective study of 42 IMRT plans demonstrated a correlation between the fraction of organs at risk (OARs) overlapping the planning target volume and the mean dose. This yielded a model, predicted dose = prescription dose (0.2 + 0.8 [1 - exp(-3 overlapping planning target volume/volume of OAR)]), that predicted the achievable mean doses according to the planning target volume overlap/volume of OAR and the prescription dose. The model was incorporated into the planning process by way of a user-executable script that reported the predicted dose for any OAR. The script was introduced to clinicians engaged in IMRT planning and deployed thereafter. The script's effect was evaluated by tracking {delta} = (mean dose-predicted dose)/predicted dose, the fraction by which the mean dose exceeded the model. Results: All OARs under investigation (rectum and bladder in prostate cancer; parotid glands, esophagus, and larynx in head-and-neck cancer) exhibited both smaller {delta} and reduced variability after script implementation. These effects were substantial for the parotid glands, for which the previous {delta} = 0.28 {+-} 0.24 was reduced to {delta} = 0.13 {+-} 0.10. The clinical relevance was most evident in the subset of cases in which the parotid glands were potentially salvageable (predicted dose dose of 20.3 Gy. After implementation, an average of 18.7 Gy was delivered to salvageable cases, with an average predicted dose of 17.2 Gy. In the prostate cases, the rectum model excess was reduced from {delta} = 0.28 {+-} 0.20 to {delta} = 0.07 {+-} 0.15. On surveying dosimetrists at the end of the study, most reported that the script both improved their IMRT planning (8 of 10) and increased their efficiency (6 of 10). Conclusions: This tool proved successful in increasing normal tissue sparing and reducing interclinician variability, providing effective quality control of the IMRT plan development process.

Moore, Kevin L., E-mail: kmoore@radonc.wustl.edu [Department of Radiation Oncology, Mallinckrodt Institute of Radiology, Washington University School of Medicine, St. Louis, MO (United States); Brame, R. Scott [Department of Radiation Oncology, University of California Los Angeles, Los Angeles, CA (United States); Low, Daniel A.; Mutic, Sasa [Department of Radiation Oncology, Mallinckrodt Institute of Radiology, Washington University School of Medicine, St. Louis, MO (United States)

2011-10-01T23:59:59.000Z

258

Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit  

Open Energy Info (EERE)

Oil and Gas Conservation Commission: February 2011 Drilling & Permit Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly

259

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMISSION COMMISSION ) In the Matter of ) July 19,2010 1 U.S. DEPARTMENT OF ENERGY 1 Docket No. 63-001-HLW 1 (High Level Waste Repository 1 Construction Authorization Application) ) ) U.S. DEPARTMENT OF ENERGY'S REPLY BRIEF IN SUPPORT OF REVIEW AND REVERSAL OF THE BOARD'S RULING ON THE MOTION TO WITHDRAW Scott Blake Harris Donald P. Irwin Sean A. Lev Michael R. Shebelskie James Bennett McRae HUNTON & WILLIAMS LLP U.S. DEPARTMENT OF ENERGY Riverfront Plaza, East Tower Office of General Counsel 95 1 East Byrd Street Department of Energy Richmond, Virginia 232 19-4074 1000 Independence Avenue, S. W. Washington, D.C. 20585 Counsel for the U.S. Department of Energy Table of Contents Page . . ........................................................................................................................ Table of Authorities

260

The California Energy Commission's geothermal activities  

SciTech Connect

Thank you for the invitation to participate in this distinguished gathering. I would like to briefly relate the interests of the California Energy Commission in geothermal energy. Geothermal energy is a basic component of many of our primary activities, and is expressly cited in our statutory authority, the Warren-Alquist Act (1974). Our mandates affect the geothermal industry both directly and indirectly. The Commission is responsible for 5-, 12-, and 20-year forecasts of California electricity supply and demand. These forecasts are reported in our biennial Electricity Report. These forecasts are used in various official regulatory proceedings. The primary use is in the Commission's power plant siting authority. The forecasts establish the base used to determine the need for new capacity and energy in the current planning period. The forecasts are also used in other Commission activities as well as in proceedings at the Public Utilities Commission. The 1990 Electricity Report represents a dramatic change in the way this agency balances the relative importance of price competition, environmental quality, demand management as a system resource, and the implications of continued reliance on natural gas. Generally, the Commission is grappling with the elusive and complex problems of quantifying the appropriate value to assign to external (i. e., non-market) environmental attributes of competing technologies. While we have not decisively established such values, we do believe that they do exist and that we are moving in the right direction. The adopted policies have positive long term implications for geothermal and the other renewable technologies. The Commission has been in existence since 1975 and during that time has seen the development of geothermal energy in several areas of the state. As a regulatory agency, we have authority over the construction of thermal electric plants over 50 megawatts (MW). To date the Commission has certified the construction of more than 1200 MW in the Geysers. This area is now experiencing a dramatic loss in productivity. The Commission is engaged in a cooperative effort with the parties operating in the Geysers to address the problem of resource productivity. We held a hearing to examine the causes of the decline of the geothermal steam resources and its affect on electric energy supply. An outcome of the hearing was the establishment of a Technical Advisory Committee with the responsibility of providing the Commission projections of capacity and energy under the current rates of steam decline. The Committee was also charged with examining options on efficient resource management, including research and development, testing, and analyses regarding reservoir and power plant operations.

Crowley, Barbara

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

A supplement to the european guidelines for quality assurance in breast cancer screening and diagnosis  

Science Conference Proceedings (OSTI)

In 2006 the fourth edition of the European Guidelines for Breast Cancer Screening and Diagnosis was published by the European Commission Due to the fast developments in the field of digital mammography and the experience with digital mammography systems ... Keywords: mammography, quality control

Ruben E van Engen; Kenneth C. Young; Hilde Bosmans; Barbara Lazzari; Stephan Schopphoven; Patrice Heid; Martin Thijssen

2010-06-01T23:59:59.000Z

262

"Quality" control in China's reform era : investigating the suzhi discourse in women's work  

E-Print Network (OSTI)

China's reform era has coincided with an emergence of a Chinese Communist Party-State ideological discourse concerning "population quality." Claims and accusations of 'low quality' are particularly targeted at rural migrant ...

Yip, Cheryl

2008-01-01T23:59:59.000Z

263

Environmental Impact Assesment in the Baltic Countries and Poland -- Screening and Quality Control  

E-Print Network (OSTI)

In The Baltic Countries And Poland - Screening And QualityIn The Baltic Countries And Poland - Screening And QualityLatvia, Lithuania and Poland. All four of these countries

Marriott, A.; Doughty, M.

1997-01-01T23:59:59.000Z

264

Quality control and assurance applied to the analysis of environmental samples collected from known geothermal sites. Final report  

DOE Green Energy (OSTI)

The components of an analytical quality control and assurance program for the analysis of trace toxic and priority pollutants are reviewed in general. It is recommended that these principles be applied to develop increased confidence in a laboratory's analytical accuracy by establishing validated standard operating procedures with built in controls and internal cross checks and developing an approved standard operating procedure for quality assurance consisting of audits and appropriate documentation. It is recommended that interlaboratory comparisons be considered as a means of continually documenting analytical accuracy.

Cooper, J.A.

1978-01-31T23:59:59.000Z

265

COMMISSION  

E-Print Network (OSTI)

amended), the National Science Foundation announces the following meeting: Name: Advisory Committee for Polar Programs (1130). Date/Time: May 29, 2008, 8 a.m. to 5 p.m.

Committee Act (pub L

2008-01-01T23:59:59.000Z

266

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. Attention: Mr. Eber R. Price Gentlemen: This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May Z-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. SW-154 and S.Iw-329. Reblying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples "ere observed. A. Incidents Involving Thorium Six incidents have bee" noted involving thorium, natural isotopic ClSS=y. The counts of the air samples in these six samples are as follows: Microcuries per ml of Air

267

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. .I,.----- Attention: Mr. Eber R. Price Gentlemen: ' B?&-# This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May 2-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. S&l-154 and SNM-329. Replying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples were observed. A. I&dents Involving Thorium Six incidents have been noted involving thorium, natural isotopic CLSS5.Y. follows: The counts of the air samples in these six samples are as

268

United States Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsýýpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

269

Commissioning the CDF offline software  

SciTech Connect

CDF II is one of the two large collider experiments at Fermilab's Tevatron. Over the past two years we have commissioned the offline computing system. A task that has involved bringing up hundreds of computers and millions of lines of C++ software. This paper reports on this experience, concentrating on the software aspects of the project. We will highlight some of the successes as well as describe some of the work still to do.

Elizabeth Sexton-Kennedy and Pasha Murat

2004-03-17T23:59:59.000Z

270

On Line Beamline Commissioning Activity Approval Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Activity Approval Form Commissioning Activity Approval Form This form is to be filled by the Commissioning Activity Team Leader. No beamline commissioning activities will be allowed to run without a properly completed, approved, and posting of this commissioning approval form. You will be notified by e-mail upon approval. Sector Beamline Expected Start Date Expected Duration 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 BM ID ( Give a Unit) Activity Description( Give only a brief description) Commissioning Team Members First and Last Name Affiliation Phone Number 1. 2. 3. 4. 5. 6. Special Safety Concerns Commissioning Activity Team Leader Name E-Mail Address Submit Commissioning Activity Approval Form Clear all Fields and start All over again!!!

271

TB-14 Section 8 - Beamline Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

8. Beamline Commissioning (Rev. July 21, 1998) A beamline commissioning process has been instituted to ensure that all systems are in place so that a beamline can perform in a safe...

272

Flathead Basin Commission Act of 1983 (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

273

Design and Commissioning of a Laboratory Scale ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Electrometallurgy 2012. Presentation Title, Design and Commissioning of a...

274

Experience with Commissioning New Generation Gas Suspension ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Experience with Commissioning...

275

Commissioning of Emirates Aluminium Smelter Potlines  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Aluminum Reduction Technology. Presentation Title, Commissioning of...

276

Corporation Commission Hydraulic FracturingHydraulic Fracturing  

E-Print Network (OSTI)

Corporation Commission Hydraulic FracturingHydraulic Fracturing Joint Committee on Energy Commission What is Hydraulic Fracturing d H D It W k?and How Does It Work? · Stimulates a well to increase by Stanolind Oil Company. 2 #12;Kansas Corporation Commission Are Hydraulic Fracture Jobs Performed in Kansas

Peterson, Blake R.

277

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE  

E-Print Network (OSTI)

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE Contact: Linda White California Postsecondary Education Commission 1303 J Street, Suite 500 Sacramento, California 95814-2938 (916) 322-7984 lwhite@cpec.ca.gov Commission Awards $1,889,657 Grant to California State University Fullerton to Improve

de Lijser, Peter

278

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II Technical Report, Annual Report to the Texas Commission on Environmental Quality September 2002 August 2003  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003, (e) (a) (b) (Vernon Supp. 2002). This annual report: provides an estimate of the energy savings and NOx reductions from energy code compliance in new residential construction in 38 counties, describes the technology developed to enable the TCEQ to substantiate energy and emissions reduction credits from EE/RE to the Environmental Protection Agency (EPA), and provides valuable insights into the effectiveness of additional energy efficiency and renewable energy measures in existing buildings and industrial facilities.

Haberl, J. S.; Culp, C.; Yazdani, B.; Fitzpatrick, T.; Bryant, J.; Turner, W. D.

2003-01-01T23:59:59.000Z

279

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I Summary Report, Annual Report to the Texas Commission on Environmental Quality September 2002 August 2003  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003, (e) (a) (b) (Vernon Supp. 2002). This annual report: provides an estimate of the energy savings and NOx reductions from energy code compliance in new residential construction in 38 counties, describes the technology developed to enable the TCEQ to substantiate energy and emissions reduction credits from EE/RE to the Environmental Protection Agency (EPA), and provides valuable insights into the effectiveness of additional energy efficiency and renewable energy measures in existing buildings and industrial facilities.

Haberl, J. S.; Culp, C.; Yazdani, B.; Fitzpatrick, T.; Bryant, J.; Turner, W. D.

2003-01-01T23:59:59.000Z

280

Results of the Excreta Bioassay Quality Control Program for April 1, 2009 through March 31, 2010  

SciTech Connect

A total of 58 urine samples and 10 fecal samples were submitted during the report period (April 1, 2009 through March 31, 2010) to General Engineering Laboratories, South Carolina by the Hanford Internal Dosimetry Program (IDP) to check the accuracy, precision, and detection levels of their analyses. Urine analyses for Sr, 238Pu, 239Pu, 241Am, 243Am 235U, 238U, elemental uranium and fecal analyses for 241Am, 238Pu and 239Pu were tested this year as well as four tissue samples for 238Pu, 239Pu, 241Am and 241Pu. The number of QC urine samples submitted during the report period represented 1.3% of the total samples submitted. In addition to the samples provided by IDP, GEL was also required to conduct their own QC program, and submit the results of analyses to IDP. About 33% of the analyses processed by GEL during the third year of this contract were quality control samples. GEL tested the performance of 21 radioisotopes, all of which met or exceeded the specifications in the Statement of Work within statistical uncertainty (Table 4).

Antonio, Cheryl L.

2012-07-19T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Results of The Excreta Bioassay Quality Control Program For April 1, 2010 Through March 31, 2011  

Science Conference Proceedings (OSTI)

A total of 76 urine samples and 10 spiked fecal samples were submitted during the report period (April 1, 2010 through March 31, 2011) to GEL Laboratories, LLC in South Carolina by the Hanford Internal Dosimetry Program (IDP) to check the accuracy, precision, and detection levels of their analyses. Urine analyses for 14C, Sr, for 238Pu, 239Pu, 241Am, 243Am, 235U, 238U, 238U-mass and fecal analyses for 241Am, 238Pu and 239Pu were tested this year. The number of QC urine samples submitted during the report period represented 1.1% of the total samples submitted. In addition to the samples provided by IDP, GEL was also required to conduct their own QC program, and submit the results of analyses to IDP. About 31% of the analyses processed by GEL during the first year of contract 112512 were quality control samples. GEL tested the performance of 23 radioisotopes, all of which met or exceeded the specifications in the Statement of Work within statistical uncertainty except the slightly elevated relative bias for 243,244Cm (Table 4).

Antonio, Cheryl L.

2012-07-19T23:59:59.000Z

282

A Real-Time and Offline Quality Control Methodology for SeaSonde High-Frequency Radar Currents  

Science Conference Proceedings (OSTI)

A near-real-time and offline quality control methodology for SeaSonde systems is proposed. It is applied on radial current maps and is based on the determination of the signal-to-noise ratio (SNR) values of the Doppler lines that contribute to the ...

Simone Cosoli; Giorgio Bolzon; Andrea Mazzoldi

2012-09-01T23:59:59.000Z

283

Review of Cyclotron Production and Quality Control of High Specific Activity Radionuclides for Biomedical, Biological, Industrial and Environmental Applications at INFN-LASA  

E-Print Network (OSTI)

Review of Cyclotron Production and Quality Control of High Specific Activity Radionuclides for Biomedical, Biological, Industrial and Environmental Applications at INFN-LASA

Birattari, C; Groppi, F; Gini, L

2001-01-01T23:59:59.000Z

284

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

Conference on Building Commissioning. May 2002. Motegi,et al: Results and Commissioning Issues from an AutomatedConference on Building Commissioning: May 1e-20, 2004

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

285

Commissioning of the superconducting ECR ion source VENUS  

E-Print Network (OSTI)

COMMISSIONING OF THE SUPERCONDUCTING ECR ION SOURCE VENUS *paper describes the ongoing commissioning. Initial resultscoils [2]. During commissioning of the superconducting

Leitner, Daniela; Abbott, Steve R.; Dwinell, Roger D.; Leitner, Matthaeus; Taylor, Clyde; Lyneis, Claude M.

2003-01-01T23:59:59.000Z

286

PP-54 Ontario Hydro Electric Power Commission | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct,...

287

Calif~rnia Energy Commission ENERGY EFFICIENCY STANDARDS  

E-Print Network (OSTI)

Building Code by the State Building Standards Commission, whichever is later. Sections applying to new-5816 2-5317 2-5317 2-5318 2-5319 Title Installation of Certified Insulation Material Piping Insulation Installation of Additional Insulation Installation of Appliances and Equipment HVAC Controls Ventilation

288

Beyond Commissioning: The Role of Automation  

Science Conference Proceedings (OSTI)

This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2005-02-01T23:59:59.000Z

289

Regulatory Commission (Commission) directs the North American Electric Reliability  

E-Print Network (OSTI)

submit to the Commission for approval proposed Reliability Standards that address the impact of geomagnetic disturbances (GMD) on the reliable operation of the Bulk-Power System. The Commission directs NERC to implement the directive in two stages. In the first stage, NERC must submit, within six months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to develop and implement operational procedures to mitigate the effects of GMDs consistent with the reliable operation of the Bulk-Power System. In the second stage, NERC must submit, within 18 months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to conduct initial and on-going assessments of the potential impact of benchmark GMDDocket No. RM12-22-000- 2-events on Bulk-Power System equipment and the Bulk-Power System as a whole. The Second Stage GMD Reliability Standards must identify benchmark GMD events that specify what severity GMD events a responsible entity must assess for potential impacts on the Bulk-Power System. If the assessments identify potential impacts from benchmark GMD events, the Reliability Standards should require owners and operators

Cfr Part

2013-01-01T23:59:59.000Z

290

National Energy Commission (China) | Open Energy Information  

Open Energy Info (EERE)

China) China) Jump to: navigation, search Name National Energy Commission (China) Place Beijing References National Energy Commission (China)[1] No information has been entered for this organization. Add Organization This article is a stub. You can help OpenEI by expanding it. National Energy Commission (China) is a new, high level, 21 member interagency commission based in Beijing, China, and is responsible for China's new energy law (expected 1/1/2011). [2] National Development and Reform Commission, Ministry of Environmental Protection (China) See also Government_policy_and_investment_in_clean_energy_(China) Key Facts Members Li Junfeng, National Development and Reform Commission ____, People's Liberation Army References ↑ "National Energy Commission (China)"

291

Trends in Twentieth-Century U.S. Snowfall Using a Quality-Controlled Dataset  

Science Conference Proceedings (OSTI)

A quality assessment of daily manual snowfall data has been undertaken for all U.S. long-term stations and their suitability for climate research. The assessment utilized expert judgment on the quality of each station. Through this process, the ...

Kenneth E. Kunkel; Michael Palecki; Leslie Ensor; Kenneth G. Hubbard; David Robinson; Kelly Redmond; David Easterling

2009-01-01T23:59:59.000Z

292

Wyoming Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Wyoming Oil and Gas Conservation Commission Wyoming Oil and Gas Conservation Commission Jump to: navigation, search State Wyoming Name Wyoming Oil and Gas Conservation Commission Address 2211 King Blvd City, State Casper, Wyoming Zip 82602 Website http://wogcc.state.wy.us/ Coordinates 42.8433001°, -106.3511243° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8433001,"lon":-106.3511243,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

293

Kansas Corporation Commission Energy Division | Open Energy Information  

Open Energy Info (EERE)

Kansas Corporation Commission Energy Division Kansas Corporation Commission Energy Division Jump to: navigation, search Name Kansas Corporation Commission Energy Division Address 1500 SW Arrowhead Road Place Topeka, KS Zip 66604-4074 Phone number 785-271-3152 Website http://www.kcc.ks.gov/energy/i Coordinates 39.04059°, -95.756198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.04059,"lon":-95.756198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

294

Railroad Commission of Texas, Oil and Gas Division | Open Energy  

Open Energy Info (EERE)

Railroad Commission of Texas, Oil and Gas Division Railroad Commission of Texas, Oil and Gas Division Jump to: navigation, search State Texas Name Texas Railroad Commission, Oil and Gas Division Address 1701 N. Congress City, State Austin, Texas Zip 78711-2967 Website http://www.rrc.state.tx.us/dat Coordinates 30.2759689°, -97.7359951° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2759689,"lon":-97.7359951,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

295

Oklahoma Corporate Commission Oil and Gas | Open Energy Information  

Open Energy Info (EERE)

Corporate Commission Oil and Gas Corporate Commission Oil and Gas Jump to: navigation, search State Oklahoma` Name Oklahoma Corporate Commission Oil and Gas City, State Oklahoma City, Oklahoma Zip 73152-2000 Website http://www.occeweb.com/og/ogho Coordinates 35.49°, -97.51° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.49,"lon":-97.51,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

296

Arkansas Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Arkansas Oil and Gas Commission Arkansas Oil and Gas Commission Jump to: navigation, search State Arkansas Name Arkansas Oil and Gas Commission Address 301 Natural Resources Dr. Ste 102 City, State Little Rock, AR Zip 72205 Website http://www.aogc.state.ar.us/JD Coordinates 34.7586275°, -92.3894219° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.7586275,"lon":-92.3894219,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

297

Hawaii Department of Land and Natural Resources Commission on Water  

Open Energy Info (EERE)

and Natural Resources Commission on Water and Natural Resources Commission on Water Resource Management Jump to: navigation, search Name Hawaii Department of Land and Natural Resources Commission on Water Resource Management Address Kalanimoku Building 1151 Punchbowl Street Room 227 Place Honolulu, Hawaii Zip 96813 Website http://hawaii.gov/dlnr/cwrm/in Coordinates 21.305788°, -157.855682° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.305788,"lon":-157.855682,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

298

Embedding Continuous Commissioning in an Energy Efficiency Retrofit Program  

E-Print Network (OSTI)

his paper presents a case study where Continuous Commissioning (CC), a process that optimizes the HVAC system operation and controls to reduce the building energy consumption and improve comfort, was embedded as one Energy Cost Reduction Measure (ECRM) in a $2.7 million energy efficiency program. The program covers four campuses and two administrative office buildings of a community college district, with a total conditioned area of 2.35 million square feet. Cumulative cost savings of over $1.7 million have been achieved since the start of the program in mid-2002. Savings as a direct result of the CC efforts account for almost 2/3 of the total cost reduction. This paper discusses major commissioning activities for the central plants and building heating, ventilation, and air conditioning (HVAC) systems, as well as how deferred maintenance issues, key to the success of any commissioning project, were addressed and adminstered by the CC engineer.

Martinez, J. T.; Claridge, D.; Baltazar-Cervantes, J. C.; Turner, W. D.; Wei, G.; Verdict, M.

2006-01-01T23:59:59.000Z

299

Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) |  

Open Energy Info (EERE)

Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Jump to: navigation, search Name Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Facility Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Gilbane Building Company Developer Narragansett Bay Commission Energy Purchaser Field's Point Location Providence RI Coordinates 41.79260859°, -71.3896966° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.79260859,"lon":-71.3896966,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

300

Using Bulls-Eye Commissioning to Save Energy in Commercial Buildings  

E-Print Network (OSTI)

Building system commissioning comes highly recommended by energy efficiency experts; however, it is rarely undertaken due to the cost and care needed to do a comprehensive job. Many existing utility meters provide whole-building 15-minute interval data that can be used to pinpoint fan control and HVAC schedule problems. Bulls-eye commissioning uses interval metering to focus detailed commissioning efforts. This paper concentrates on a single customer and how bulls-eye commissioning can be applied to focus the commissioning process. Significant energy savings were found by using interval data in conjunction with outside air temperature to isolate problems with schedules and in the economizer controls. Evaluation of main meter profiles allows detailed commissioning work to be better focused and more effective without the wait and expense of full commissioning services. Bulls-eye commissioning can be applied on its own or can be coordinated with traditional commissioning. In either case, the main meter profile shows what will directly impact total energy use and the customer's bill.

Price, W.; Hart, R.

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

NIST Blue Ribbon Commission on Management and Safety ? ...  

Science Conference Proceedings (OSTI)

NIST Blue Ribbon Commission on Management and Safety II. The NIST Blue Ribbon Commission on Management and ...

2012-08-27T23:59:59.000Z

302

NIST Blue Ribbon Commission on Management and Safety ...  

Science Conference Proceedings (OSTI)

... See NIST Blue Ribbon Commission on Management and Safety II. NIST Blue Ribbon Commission on Management and Safety. ...

2010-10-05T23:59:59.000Z

303

Data Quality Assessment and Control for the ARM Climate Research Facility  

Science Conference Proceedings (OSTI)

The mission of the Atmospheric Radiation Measurement (ARM) Climate Research Facility is to provide observations of the earth climate system to the climate research community for the purpose of improving the understanding and representation, in climate and earth system models, of clouds and aerosols as well as their coupling with the Earth's surface. In order for ARM measurements to be useful toward this goal, it is important that the measurements are of a known and reasonable quality. The ARM data quality program includes several components designed to identify quality issues in near-real-time, track problems to solutions, assess more subtle long-term issues, and communicate problems to the user community.

Peppler, R

2012-06-26T23:59:59.000Z

304

Quality Control and Flux Sampling Problems for Tower and Aircraft Data  

Science Conference Proceedings (OSTI)

A series of automated tests is developed for tower and aircraft time series to identify instrumentation problems, flux sampling problems, and physically plausible but unusual situations. The automated procedures serve as a safety net for quality ...

Dean Vickers; L. Mahrt

1997-06-01T23:59:59.000Z

305

Quality Control and Tilt Correction Effects on the Turbulent Fluxes Observed at an Ocean Platform  

Science Conference Proceedings (OSTI)

This study investigates atmospheric factors influencing the quality and the postprocessing (e.g., tilt correction) of fast-response measurements of turbulent fluxes for difficult open-sea measurements over an offshore platform. The data were ...

Hyun-Mi Oh; Kyung-Eak Kim; Kyung-Ja Ha; Larry Mahrt; Jae-Seol Shim

2011-03-01T23:59:59.000Z

306

On the Use of Satellite Altimeter Data in Argo Quality Control  

Science Conference Proceedings (OSTI)

Satellite altimeter measurements are used to check the quality of the Argo profiling floats time series. The method compares collocated sea level anomalies from altimeter measurements and dynamic height anomalies calculated from Argo temperature ...

Stephanie Guinehut; Christine Coatanoan; Anne-Lise Dhomps; Pierre-Yves Le Traon; Gilles Larnicol

2009-02-01T23:59:59.000Z

307

Utah Labor Commission | Open Energy Information  

Open Energy Info (EERE)

Labor Commission Labor Commission Jump to: navigation, search Name Utah Labor Commission Address 160 East 300 South, 3rd Floor Place Salt Lake City, Utah Zip 84114-6600 Phone number (801) 530-6800 Website http://laborcommission.utah.go References Website[1] This article is a stub. You can help OpenEI by expanding it. Utah Labor Commission is an organization based in Salt Lake City, Utah. The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic well-being of employees and employers. It is a multi-division state agency directed by a Commissioner who is appointed by the Governor. The Commissioner oversees the various functions of the divisions within the Commission.

308

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! ☺ ☺ ☺ ☺ ☺ ☺

309

UNITED STATES ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

I(S.0 -01: I(S.0 -01: SPECIAL NUCLEAR MATERIAL LlCEWSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," o. license is hereby issued authorizing the licensee to receive and possess the special nuclear material designated below; to use such special nuclear material for the purpose(s) and at the place(s) designated below; and to transfer such material to persons' authorized to receive it in accordance with the regulations in said Port. This license shall be deemed to contain the conditions specified in Section 70.32(a) of said regulations, and is subject to all applicable rules, regtdations, and orders of the Atomic Energy Commission now or hereafter in

310

The Operation of the Low Pay Commission  

E-Print Network (OSTI)

were the Human Resources Director of a major hotel and catering group, the Human Resources Policy Director (later promoted to Deputy Director-General) of the Confederation of British Industry, and the Chief Executive of a retailers federation... of the Commission, to the Inland Revenue which tackled the task with energy, imagination and common sense. The Government also simplified the Commissions task by prejudging certain aspects of the National Minimum Wage. Particularly important was that it should...

Brown, William

2004-06-16T23:59:59.000Z

311

Regional Districts, Commissions, and Authorities (South Carolina) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Siting and Permitting Provider Regional Districts, Commissions, and Authorities

312

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Report to the Governor Final Report to the Governor and the Iowa General Assembly Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and Practices 2 Table of Contents Commission Members page 3 Executive Summary page 4 Summary of Recommendations page 5 Legislative Overview page 12 Profile on Iowa's Energy Usage page 14 Commission Proceedings page 15 Recommendations Energy Code Adoption & Compliance page 20 Financing & Incentives page 25 Training and Education page 29 Licensing and Certification page 31 Additional Energy Efficiency Recommendations page 32

313

Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 Federal Register 23 Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection Activities: Proposed Collection; Comment Request; Election Assistance Commission's Voting System Test Laboratory Program Manual, Version 1.0 AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice; comment request. SUMMARY: As part of its continuing effort to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995, the U.S. Election Assistance Commission (EAC) invites the general public and other Federal agencies to take this opportunity to comment on EAC's request to renew an existing information collection, EAC's Voting System Test Laboratory Program Manual, Version

314

Step 5: Commission the building | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Specify detailed commissioning activities in the project contracts. Ensure that your architect or engineer transfers technical documents to the building's operations and...

315

ORLANDO UTILITIES COMMISSION RFP No. 2400 QQ  

NLE Websites -- All DOE Office Websites (Extended Search)

ORLANDO UTILITIES COMMISSION REQUEST FOR PROPOSAL For GREEN ENERGY PROGRAM RFP NO. 2400 OQ COMMISSIONERS LONNIE C. BELL President KATIE PORTA First Vice President MAYLEN DOMINGUEZ...

316

A History of the Atomic Energy Commission  

Energy.gov (U.S. Department of Energy (DOE))

A History of the Atomic Energy Commission - written by Alice L. BuckWashington, D.C.: U.S. Department of Energy, July 1983.41 pp.

317

County Land Preservation and Use Commissions (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance creates Land Preservation and Use Commissions in each county to provide for the orderly use and development of land, to protect agricultural land from nonagricultural development,...

318

IMAGINE Officially Starts Commissioning | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

The IMAGINE team present for the official start of commissioning. Doug Selby, HFIR instrument coordinator, hands the shutter keys to IMAGINE instrument scientist Flora...

319

California Energy Commission - Electricity Consumption by Planning...  

Open Energy Info (EERE)

Planning Area (1990-2009) Electricity consumption data from the California Energy Commission by planning area for Commercial, Residential, Ag & Water Pump, Streetlight,...

320

Nevada Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Nevada Public Utilities Commission Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleNevadaPublic...

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Factors controlling reservoir quality in tertiary sandstones and their significance to geopressured geothermal production  

DOE Green Energy (OSTI)

Variable intensity of diagenesis is the factor primarily responsible for contrasting regional reservoir quality of Tertiary sandstones from the upper and lower Texas coast. Detailed comparison of Frio sandstone from the Chocolate Bayou/Danbury Dome area, Brazoria County, and Vicksburg sandstones from the McAllen Ranch Field area, Hidalgo County, reveals that extent of diagenetic modification is most strongly influenced by (1) detrital mineralogy and (2) regional geothermal gradients. The regional reservoir quality of Frio sandstones from Brazoria County is far better than that characterizing Vicksburg sandstones from Hidalgo County, especially at depths suitable for geopressured geothermal energy production. However, in predicting reservoir quality on a site-specific basis, locally variable factors such as relative proportions for porosity types, pore geometry as related to permeability, and local depositional environment must also be considered. Even in an area of regionally favorable reservoir quality, such local factors can significantly affect reservoir quality and, hence, the geothermal production potential of a specific sandstone unit.

Loucks, R.G.; Richmann, D.L.; Milliken, K.L.

1981-01-01T23:59:59.000Z

322

Commissioning Residential Ventilation Systems: A Combined Assessment of  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Residential Ventilation Commissioning Residential Ventilation Systems: A Combined Assessment of Energy and Air Quality Potential Values William J.N. Turner, Jennifer M. Logue, Craig P. Wray Environmental Energy Technologies Division July 2012 LBNL-5969E Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor the Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein

323

Quality Reference Samples  

Science Conference Proceedings (OSTI)

Peer-reviewed fats and oils related performance-based control samples for lab quality assurance and quality control. Quality Reference Samples Certified Reference Materials (CRM) aocs certified Certified Reference Materials chemists CRM fat fats lab labo

324

Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future  

Science Conference Proceedings (OSTI)

This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

Brambley, Michael R.; Katipamula, Srinivas

2007-01-31T23:59:59.000Z

325

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects  

SciTech Connect

Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A total of 1120 deficiency-intervention combinations were identified in the course of commissioning the projects described in this report. The most common location of deficiencies was in HVAC equipment (65% of sites), followed by air-handling and distributions systems (59%), cooling plant (29%), heating plants (24%), and terminal units (24%). The most common interventions were adjusting setpoints, modifying sequences of operations, calibration, and various mechanical fixes (each done in about two-thirds of the sites). The normalized rate of occurrence of deficiencies and corresponding interventions ranged from about 0.1/100ksf to 10/100ksf, depending on the issue. From these interventions flowed significant and highly cost-effective energy savings For the MBCx cohort, source energy savings of 22 kBTU/sf-year (10%) were achieved, with a range of 2% to 25%. Median electricity savings were 1.9 kWh/sf-year (9%), with a range of 1% to 17%. Peak electrical demand savings were 0.2 W/sf-year (4%), with a range of 3% to 11%. The aggregate commissioning cost for the 24 projects was $2.9 million. We observed a range of normalized costs from $0.37 to 1.62/sf, with a median value of $1.00/sf for buildings that implemented MBCx projects. Per the program design, monitoring costs as a percentage of total costs are significantly higher in MBCx projects (median value 40%) than typical commissioning projects included in the Meta-analysis (median value of 2% in the commissioning database). Half of the projects were in buildings containing complex and energy-intensive laboratory space, with higher associated costs. Median energy cost savings were $0.25/sf-year, for a median simple payback time of 2.5 years. Significant and cost-effective energy savings were thus obtained. The greatest absolute energy savings and shortest payback times were achieved in laboratory-type facilities. While impacts varied from project to project, on a portfolio basis we find MBCx to be a highly cost-effective means of obtaining significant program-level energy savings across a variety of building types. E

Mills, Evan; Mathew, Paul

2009-04-01T23:59:59.000Z

326

Java Tool Framework for Automation of Hardware Commissioning and Maintenance Procedures  

Science Conference Proceedings (OSTI)

The National Ignition Facility (NIF) is a 192-beam laser system designed to study high energy density physics. Each beam line contains a variety of line replaceable units (LRUs) that contain optics, stepping motors, sensors and other devices to control and diagnose the laser. During commissioning and subsequent maintenance of the laser, LRUs undergo a qualification process using the Integrated Computer Control System (ICCS) to verify and calibrate the equipment. The commissioning processes are both repetitive and tedious when we use remote manual computer controls, making them ideal candidates for software automation. Maintenance and Commissioning Tool (MCT) software was developed to improve the efficiency of the qualification process. The tools are implemented in Java, leveraging ICCS services and CORBA to communicate with the control devices. The framework provides easy-to-use mechanisms for handling configuration data, task execution, task progress reporting, and generation of commissioning test reports. The tool framework design and application examples will be discussed.

Ho, J C; Fisher, J M; Gordon, J B; Lagin, L J; West, S L

2007-10-02T23:59:59.000Z

327

The Quality Control of Long-Term Climatological Data Using Objective Data Analysis  

Science Conference Proceedings (OSTI)

One of the major concerns with detecting global climate change is the quality of the data. Climate data are extremely sensitive to errant values and outliers. Prior to analysis of these time series, it is important to remove outliers in a ...

Jon K. Eischeid; C. Bruce Baker; Thomas R. Karl; Henry F. Diaz

1995-12-01T23:59:59.000Z

328

Temperature and combustion quality control in power station boilers using artificial neural networks  

Science Conference Proceedings (OSTI)

The classification is an important domain in boiler flame image processing and is a preliminary step toward detection, recognition and understanding of combustion condition. In this paper, Back Propagation Algorithm (BPA) is introduced for boiler flame ... Keywords: Back Propagation Algorithm, Fisher's linear discriminant analysis, combustion quality, features, flame colour, image processing, temperature identification

K. Sujatha; N. Pappa

2010-09-01T23:59:59.000Z

329

An Improved Quality Control for AIRS Total Column Ozone Observations within and around Hurricanes  

Science Conference Proceedings (OSTI)

Atmospheric Infrared Sounder (AIRS) provides twice-daily global observations from which total column ozone data can be retrieved. However, 20% ~ 30% of AIRS ozone data are flagged to be of bad quality. Most of the flagged data were identified to ...

H. Wang; X. Zou; G. Li

2012-03-01T23:59:59.000Z

330

Quality Control and Archiving of Digital Data Gathered by the Bureau of Reclamation's Weather Radar  

Science Conference Proceedings (OSTI)

This paid describes the logic and process used to process high volumes of digital radar data recorded on magnetic tape to a compressed quality-checked archival format. The basic Philosophy in the processing is to retain all echo data that exceed ...

Gerard E. Klazura; Ra Aman

1989-12-01T23:59:59.000Z

331

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: 1 Energy Commission

332

Implementation Update Black and Gold Commission  

E-Print Network (OSTI)

Implementation Update Black and Gold Commission June, 2003 1 Action Item/ Major Initiative Outcomes Policies and Practices of UWM with principles and goals of Black & Gold Commission UWM culture supports Senate; Student Association; Classified Employee Groups; Deans & Division Heads Spirit of the Black

Saldin, Dilano

333

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

for solar energy by dramatically reducing the cost of solar. As part of the statewide solar effort, the CPUC of the state's solar offerings, such as the California Energy Commission's (Energy Commission) New Solar Homes Renewable Energy Council (IREC) released Larry Sherwood's U.S. Solar Market Trends for 2007 report

334

Commissioning of the T2K Beamline  

Science Conference Proceedings (OSTI)

The initial commissioning of the beam line for the T2K long baseline neutrino experiment was carried out in April and May of 2009. This paper contains an overview of the beam line components and presents initial results from the beam line commissioning.

Hartz, Mark [Department of Physics, University of Toronto, 60 St. George St., Toronto, M5S 1A7, Ontario (Canada)

2010-03-30T23:59:59.000Z

335

California Energy Commission DRAFT COMMITTEE REPORT  

E-Print Network (OSTI)

of the Energy Commission until the report is adopted. #12;i ABSTRACT These proposed electricity supply forms demand for energy and annual peak load will be met by specific supply resources. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CTD. #12;ii #12

336

A Practical Guide for Commissioning Existing Buildings  

SciTech Connect

Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

Haasl, T.; Sharp, T.

1999-04-01T23:59:59.000Z

337

Water Quality Act (New Mexico) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act (New Mexico) Act (New Mexico) Water Quality Act (New Mexico) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Mexico Program Type Environmental Regulations Provider New Mexico Environment Department This act establishes the Water Quality Control Commission and states the

338

United Nations Economic Commission for Latin America and the Caribbean |  

Open Energy Info (EERE)

Economic Commission for Latin America and the Caribbean Economic Commission for Latin America and the Caribbean Jump to: navigation, search Logo: United Nations Economic Commission for Latin America and the Caribbean Name United Nations Economic Commission for Latin America and the Caribbean Address Av. Dag Hammarkjold 3477 Vitacura, Santiago, Chile Place Santiago, Chile Year founded 1948 Phone number (56-2) 210-2380-210-2149 Website http://www.eclac.org/default.a Coordinates -33.40437°, -70.6006° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-33.40437,"lon":-70.6006,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

339

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES  

Science Conference Proceedings (OSTI)

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

Allison, Trent; Davis, G; Drury, Michael; Harwood, Leigh; Hogan, John; Kimber, Andrew; Lahti, George; Merz, William; Nelson, Richard; Plawski, Tomasz; Seidman, David; Spata, Michael; Wilson, Michael

2012-07-01T23:59:59.000Z

340

Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future  

SciTech Connect

This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2011-08-16T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Commissioning and performance of the BNL EBIS LLRF system  

Science Conference Proceedings (OSTI)

The Electron Beam Ion Source (EBIS) LLRF system utilizes the RHIC LLRF upgrade platform to achieve the required functionality and flexibility. The LLRF system provides drive to the EBIS high-level RF system, employs I-Q feedback to provide required amplitude and phase stability, and implements a cavity resonance control scheme. The embedded system provides the interface to the existing Controls System, making remote system control and diagnostics possible. The flexibility of the system allows us to reuse VHDL codes, develop new functionalities, improve current designs, and implement new features with relative ease. In this paper, we will discuss the commissioning process, issues encountered, and performance of the system.

Yuan, S.; Smith, K.S.; Hayes, T.; Severino, F.; Harvey, M.; Narayan, G.; Zaltsman, A.

2011-03-28T23:59:59.000Z

342

Commissioning results from the recently upgraded RHIC LLRF system  

Science Conference Proceedings (OSTI)

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

2011-03-28T23:59:59.000Z

343

Degradation of the E. coli small heat-shock proteins by the AAA+ protease lon : significance to protein quality-control  

E-Print Network (OSTI)

The refolding and elimination of damaged and aggregated proteins requires the concerted effort of several branches of the protein quality-control network. This network includes refolding chaperones, disaggregases, holdases ...

Bissonnette, Sarah Ayano

2010-01-01T23:59:59.000Z

344

Implementation of Real-Time Quality Control Procedures by Means of a Probabilistic Estimate of Seawater Temperature and Its Temporal Evolution  

Science Conference Proceedings (OSTI)

Near-real-time quality control procedures for temperature profiles collected from ships of opportunity were implemented during the 1980s in oceans across the world and from the 1990s in the Mediterranean. In this sea, the procedures were ...

Giuseppe M. R. Manzella; Marco Gambetta

2013-03-01T23:59:59.000Z

345

Hutchinson Utilities Commission - Residential Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hutchinson Utilities Commission - Residential Energy Efficiency Hutchinson Utilities Commission - Residential Energy Efficiency Program Hutchinson Utilities Commission - Residential Energy Efficiency Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Water Heating Maximum Rebate 500 Program Info Expiration Date program offered until expiration of funding State Minnesota Program Type Utility Rebate Program Rebate Amount Natural Gas Furnaces: $150-$250, depending on efficiency Natural Gas Furnace Tune-up: $25 ECM Motor: $75 Natural Gas Boilers: $200 Central Air Conditioners: $250 Central Air Conditioner Tune-up: $25 Tankless Gas Water Heaters: $150 Storage Gas Water Heaters: $50 Air Source Heat Pumps: $75/ton

346

Public Utility Commission in the year 2000  

Science Conference Proceedings (OSTI)

This article is about What is and What ought to be as we look to the institution of public utility commission regulation at the turn of the century. To signal my own view at the outset, I find the prospects somewhat worrisome in light of the nature and direction of much of the response to real and imaginary changes in the regulated sectors. I surely do not call for standing in place, but I strongly believe we should leave the place standing. The following items are discernable trends that will shape the PUC at the turn-of-the century: (1) dichotomy of customers into core and noncore groups, (2) unbundling and new service offerings with a menu of prices, (3) relaxed regulation and increased reliance on market solutions instead of command and control, (4) increased use of market-based pricing and incentive ratemaking, (5) large users seeking lowest-cost generation and supply services, (6) shift from old regulatory bargains regarding exclusive territorial franchises and assured recovery of costs and investments, (7) utility diversification, (8) increasing business risk for utilities, amd (9) uncertainty as to continued utility attention to social goals and a changing obligation to serve. For each of these, the author focuses on: (1) changing missions and roles of the PUC, (2) the strategies for achieving them, and (3) the implementation requirements that operationalize the strategies.

Jones, D.N.

1995-12-31T23:59:59.000Z

347

Department of Energy Awards Eddy/Lea Regional Commission $300...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EddyLea Regional Commission 300,000 Grant Department of Energy Awards EddyLea Regional Commission 300,000 Grant Department of Energy Awards EddyLea Regional Commission...

348

California Energy Commission Library Recent Acquisitions January March 2012  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions January ­ March 2012 AIR: California Public Utilities Commission Conference: CPUC Energy Symposium (1980: Stanford University) Publisher: California Public Utilities Commission Year: 1980 Call number: B.65/E5682/1980 The very

349

California Energy Commission Library Recent Acquisitions October December 2011  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions October ­ December 2011, Charles; Roberts, Miles Corp. Author: California Energy Commission, Emerging Fuels and Technologies Office Publisher: California Energy Commission Year: 2011 Call number: INTERNET CEC Pub. #: CEC

350

Commissioning and early experiments of the PHELIX facility  

E-Print Network (OSTI)

009-3855-7 Commissioning and early experiments of the PHELIXthe recent years, the commissioning and operation of high-paper, we report on the commissioning of the PHELIX facility

2010-01-01T23:59:59.000Z

351

Retro-Commissioning Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Program Retro-Commissioning Program Retro-Commissioning Program < Back Eligibility Commercial Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Maximum Rebate $200,000 per site per calendar year $400,000 per customer per calendar year for all Focus incentives Program Info Funding Source Focus on Energy Program Start Date 09/01/2012 State Wisconsin Program Type State Rebate Program Rebate Amount $0.08/kWh or $0.50/therm saved for installed measures Focus on Energy offers financial incentives to eligible business customers to retro-commission buildings to optimize performance. The program provides incentives for building efficiency studies based on the size of the

352

LINE Commission Visits Idaho National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

353

NUCLEAR REGULATORY,.COMMISSION REGION I  

Office of Legacy Management (LM)

REGULATORY,.COMMISSION REGULATORY,.COMMISSION REGION I lY,.COMMISSION 475 ALLENDALE ROAD KlNG OF PRUSSIA. PENNSYLVANIA 194061415 GION I NOALE ROAD ENNSYLVANlA 194061415 MAY I5 1996 MAY I5 1996 Docket No. 040-07964 License No. SlJ (Rs Heyman Properties Attention: Mr. John S. Russo Facility Manager 333 Post Road West Westport, CT 06881 SUBJECT: INSPECTION NO. 040-07964/96-001 Dear Mr. Russo: On April 15, 1996, Todd J. Jackson of this office conducted a routine inspection at 737 Canal Street, Stamford, Connecticut of activities o Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The inspection consisted of observations by the inspect0 interviews with personnel, and a radiological survey by the inspector Jackson was accompanied on this inspection by representatives of the

354

California Energy Commission COMMITTEE FINAL REPORT  

E-Print Network (OSTI)

of the California Energy Commission's Strategic Transmission Planning Office, Electricity Analysis Office electric transmission system facilities on their bulk transmission network and on specific projects Policy Report and the 2011 Strategic Transmission Investment Plan. Keywords: Electric transmission, bulk

355

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the California Energy Commission's Strategic Transmission Planning Office, Electricity Analysis Office electric transmission system facilities on their bulk transmission network and on specific projects and the 2011 Strategic Transmission Investment Plan. Keywords: Electric transmission, bulk electric

356

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report July 2008 #12;California Solar Initiative, CPUC Staff Progress Report, July 2008: Zerull Location: San Rafael, CA System size: 14 kW Funded by the California Solar Initiative

357

California Public Utilities Commission California Solar Initiative  

E-Print Network (OSTI)

California Public Utilities Commission California Solar Initiative Program Handbook September 2012Power #12;Table of Contents i California Solar Initiative Program Handbook September 2012 1. Introduction: California Solar Initiative Program....................................................................1 1

358

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report January 2008 #12;California Solar Initiative, CPUC Staff Progress Report, January 2008 This page intentionally left blank. #12;California Solar Initiative, CPUC Staff Progress Report, January 2008 Table of Contents

359

Forestry Commission Scotland 231 Corstorphine Road  

E-Print Network (OSTI)

development - Forestry - Sustainable development - Renewable Energy - Community development - Financial Forestry Sustainable development Renewable Energy Community development Financial management Housing, ethnicity, gender, marital status, religion, sexuality and transgender. #12;Annex 1: FORESTRY COMMISSION

360

ALICE Commissioning: Getting Ready for Physics  

E-Print Network (OSTI)

ALICE is a general-purpose heavy-ion detector at the CERN LHC. We describe the commissioning activities in the years 2007-2009 and the status of the different subsystems at the time of this conference.

C. Lippmann; for the ALICE collaboration

2009-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity) ................................................................ 19 Supply Form S2: Energy Balance Table ...................... California Energy Commission DRAFT STAFF REPORT FORMS AND INSTRUCTIONS FOR SUBMITTING

362

Checkout, Testing, and Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The CP RM Module is a tool that assists DOE federal project review teams in evaluating the sufficiency of the Commissioning Plan and its implementation. The CP RM can be used by the DOE federal...

363

California Energy Commission - Electricity Consumption by County  

Open Energy Info (EERE)

County (2006-2009) Electricity consumption data from the California Energy Commission sorted by County for Residential and Non-residential from 2006 to 2009.


...

364

Delmarva - Commissioning and Operations Incentive Programs (Maryland...  

Open Energy Info (EERE)

Construction: up to 8,000 (design); 8,000 (commissioning); 6,000 (analysistesting) Energy Savings Study Incentive: Additional 75% of cost, up to 20,000 Operations and...

365

Electronic Forms & Pen Computers Improve Building Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Forms & Pen Computers Improve Building Commissioning Speaker(s): Rich Sydlowski Date: August 8, 2001 - 12:00pm Location: Bldg. 90 Seminar HostPoint of Contact:...

366

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects  

E-Print Network (OSTI)

Buildings. California Commissioning Collaborative. Haasl,2006b. California Commissioning Guide: Existing Buildings.California Commissioning Collaborative. Haves, P. , and

Mills, Evan

2009-01-01T23:59:59.000Z

367

Colorado Commission of Indian Affairs | Open Energy Information  

Open Energy Info (EERE)

Indian Affairs Indian Affairs Jump to: navigation, search Logo: Colorado Commission of Indian Affairs Name Colorado Commission of Indian Affairs Address 130 State Capitol Place Denver, Colorado Zip 80202 Year founded 1976 Website http://www.colorado.gov/cs/Sat Coordinates 39.7392291°, -104.9848151° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7392291,"lon":-104.9848151,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

368

United Nations Economic Commission for Africa | Open Energy Information  

Open Energy Info (EERE)

Africa Africa Jump to: navigation, search Name United Nations Economic Commission for Africa Address Economic Commission for Africa, P.O. Box 3001, Addis Ababa, Ethiopia Place Addis Ababa, Ethiopia Year founded 1958 Phone number +251 11 551 7200 Website http://www.uneca.org/index.htm Coordinates 9.022736°, 38.746799° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":9.022736,"lon":38.746799,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

369

United Nations Economic Commission for Europe | Open Energy Information  

Open Energy Info (EERE)

Europe Europe Jump to: navigation, search Name United Nations Economic Commission for Europe Address UN Economic Commission for Europe Information Service Palais des Nations Place Geneva, Switzerland Year founded 1947 Phone number +41 (0) 22 917 44 44 Website http://www.unece.org/Welcome.h Coordinates 46.2266748°, 6.1404115° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.2266748,"lon":6.1404115,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

370

European Commission Joint Research Centre | Open Energy Information  

Open Energy Info (EERE)

Research Centre Research Centre Jump to: navigation, search Logo: European Commission Joint Research Centre Name European Commission Joint Research Centre Address 1049 Brussels Place Brussels, Belgium Year founded 1957 Website http://ec.europa.eu/dgs/jrc/in Coordinates 50.8509279°, 4.3601162° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8509279,"lon":4.3601162,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

371

Preparing accelerator systems for the RHIC sextant commissioning  

Science Conference Proceedings (OSTI)

The Relativistic Heavy Ion Collider (RHIC) construction is progressing steadily towards completion in 1999 when beams will circulate in both collider rings. One of the major tests of the RHIC project was the commissioning of the first sextant with gold ion beams in early 1997. This is a report on preparation of the RHIC accelerator systems for the first sextant test. It includes beam position monitors, timing, injection correction through the magnetic septum and kickers, current transformers, flags and the ionization beam profile monitors, beam loss monitors, beam and quench permit link system, power supply controls, and the configuration database system. The software and hardware development and coordination of the different systems before commissioning were regularly checked during bi-weekly, and (later) weekly, progress report meetings.

Trbojevic, D.; Pilat, F.; Ahrens, L. [and others

1997-07-01T23:59:59.000Z

372

Lattice Commissioning Stretgy Simulation for the B Factory  

Science Conference Proceedings (OSTI)

To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

Lee, M.; Whittum, D.; Yan, Y.; Cai, Y.; Shoaee, H.; /SLAC

2011-08-26T23:59:59.000Z

373

The intermountain power project commissioning - Subsynchronous torsional interaction tests  

SciTech Connect

Subsyncronous torsional vibration as a result of electrochemical interaction between the HVDC controls and a turbine-generator was first discovered during the commissioning of the Square Butte Project in 1977. The level of interaction between the HVDC controls and the turbine-generator depends on several interacting factors: the characteristic torsional frequencies of the turbine-generator, the bandwidth of the HVDC controls and the relative strength of the connecting ac system. For the Intermountain Power Project (IPP), early analysis of these interacting factors indicated that there exist definite potential for subsynchronous oscillation to occur. The calculated torsional frequencies of the IPP units showed that the first mode frequency is 14.0 Hz and is within the typical bandwidth of an HVDC control which is between 10-20 Hz. The HVDC controls, therefore, can influence the torsional stability of the IPP units. Further, the IPP turbine-generators are required to operate isolated on the HVDC rectifier terminal, with no other interconnecting ac network. This ''radial'' mode of operation will result in maximum interaction between the converter station and the IPP units. It became obvious that special measure must be implemented in the design of the IPP HVDC control system to modify its typical characteristics to avoid the occurrence of the subsynchronous oscillation. This paper presents the results of the subsynchronous torsional interaction (SSTI) tests that were performed during the commissioning of the IPP Unit 1 and the HVDC Transmission system.

Wu, C.T.; Peterson, K.J. (Dept. of Water and Power, Los Angeles, CA (US)); Pinko, R.J.; Kankam, M.D.; Baker, D.H. (General Electric Co., Schenectady, NY (US))

1988-10-01T23:59:59.000Z

374

Department of Energy and Nuclear Regulatory Commission Increase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to...

375

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

376

Public Service Commission of Wisconsin | Open Energy Information  

Open Energy Info (EERE)

Public Service Commission of Wisconsin Jump to: navigation, search Name Public Service Commission of Wisconsin Address 610 North Whitney Way Place Madison, Wisconsin Zip 53707-7854...

377

Monitoring-based HVAC Commissioning of an Existing Office Building...  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiency Title Monitoring-based HVAC Commissioning of an Existing Office Building for Energy...

378

TMS/ASM Joint Commission on Metallurgical Transactions  

Science Conference Proceedings (OSTI)

TMS/ASM Joint Commission on Metallurgical Transactions. The function of the Joint Commission is as follows: Consistent with the Purpose and Scope of...

379

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (2010) Contains data from the California Energy Commission on weekly refinery production and stock...

380

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (2000) Contains data from the California Energy Commission on weekly refinery production and stock...

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (1999) Contains data from the California Energy Commission on weekly refinery production and stock...

382

Update on Blue Ribbon Commission for America's Nuclear Future...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Future Update on Blue Ribbon Commission for America's Nuclear Future BRC-SEAB-October-12%202011.pdf More Documents & Publications Blue Ribbon Commission on America's...

383

Energy Department and French Commission on Atomic Energy and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Energy Department and French Commission on Atomic...

384

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...

385

Including Retro-Commissioning in Federal Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

11.2 Retro-Cx in Federal ESPCs Including Retro-Commissioning In Federal Energy Saving Performance Contracts Retro-commissioning generally reduces operating and maintenance costs,...

386

Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...  

National Nuclear Security Administration (NNSA)

Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Atomic Energy Commission Explores Peaceful Uses of ... Atomic Energy Commission Explores Peaceful...

387

PP-03 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PP-03 Federal Power Commission More Documents & Publications PP-35 Trico...

388

PP-13 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PP-13 Federal Power Commission More Documents & Publications PP-231...

389

Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuels Fuels Taxation Study Commission to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Taxation Study Commission

390

California Energy Commission - Natural Gas Consumption by Utility  

Open Energy Info (EERE)

California Energy Commission - Natural Gas Consumption by Utility (1990-2009) California Energy Commission natural gas consumption data by Utility company for Commercial,...

391

Achieving Better Building Performance and Savings Using Optimal Control Strategies  

E-Print Network (OSTI)

The Continuous Commissioning (CCSM) process has become a very important energy conservation topic for new and existing commercial buildings. This process can yield substantial operating savings, improved indoor air quality, and enhanced occupant comfort. It also provides solutions to reoccurring building maintenance problems. One tool that can be implemented during commissioning work is a nearoptimal global set point method in an Energy Management Control System (EMCS) Direct Digital Controller (DDC). This algorithm is based on mathematical models for the chillers, boilers, chilled and hot water pumps, and air handler fans that relate the power of these components as a function of the chilled water and hot water differential temperature. The algorithm will minimize the total plant power consumption. These optimal control strategies make the CC process more effective. The Texas A&M University Systems State Headquarters is an office building, with a total floor area of approximately 123,960 ft2. An integrated commissioning of the HVAC systems was performed for this building. This paper describes the commissioning activities and demonstrates how newly developed optimized control strategies improved the building comfort conditions and reduced utility costs during and after the commissioning period.

Chen, H.; Deng, S.; Bruner, H.

2003-01-01T23:59:59.000Z

392

COMMISSIONING SPIN ROTATORS IN RHIC.  

Science Conference Proceedings (OSTI)

During the summer of 2002, eight superconducting helical spin rotators were installed into RHIC in order to control the polarization directions independently at the STAR and PHENIX experiments. Without the rotators, the orientation of polarization at the interaction points would only be vertical. With four rotators around each of the two experiments, we can rotate either or both beams from vertical into the horizontal plane through the interaction region and then back to vertical on the other side. This allows independent control for each beam with vertical, longitudinal, or radial polarization at the experiment. In this paper, we present results from the first run using the new spin rotators at PHENIX.

Mackay, W W; Bai, M; Courant, E D; Fischer, W; Huang, H; Luccio, A; Montag, C; Pilat, F; Ptitsyn, V; Roser, T; Satogata, T; Trbojevic, D

2003-05-12T23:59:59.000Z

393

Production of High Quality Dust Control Foam to Minimize Moisture Addition to Coal  

E-Print Network (OSTI)

Foam is displacing wet suppression as the method of choice for controlling fugitive emissions from coal. Coal treated by wet suppression consumes through moisture addition, a heat energy equivalent of 1 ton out of every 500 tons fired. The application of foam requires less than 10% of the moisture usually required for wet suppression. In addition, foam is a much more effective dust suppressant, especially on respirable dust (particle with an aerodynamic diameter less than 10 microns). To achieve maximum benefit from foam dust control, efficient on-site production of dry, stable foam is required. This paper discusses the basics of foam production and the many variables affecting foam expansion ratios. Successful applications of foam are also described.

Termine, F.; Jordan, S. T.

1985-05-01T23:59:59.000Z

394

Federal Energy Regulatory Commission financial statements, September 30, 1995 and 1994  

SciTech Connect

The attached report presents the results of the independent certified public accountant`s audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1995 and 1994. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on FERC`s internal control structure and on compliance with laws and regulations, and management letter are also provided.

NONE

1996-02-12T23:59:59.000Z

395

Quality-control gas-detector tube readers: optical versus observer  

SciTech Connect

The influence of temperature and humidity upon two length-of-stain gas detector tube systems was studied. Length-of-stain tubes were exposed under carefully controlled laboratory conditions, then read by a panel of observers and a newly developed optical tube reader. Data from the study show, generally, good correlation of results between the observer panel and the optical tube reader. Also, the data indicated that temperature and humidity calibration curves or tables were needed for several of the detector tubes. The two detector tube systems were comparable in reliability; however, for detecting a particular gas, one system may be selected over the other.

Carroll, H.B. Jr.

1976-12-01T23:59:59.000Z

396

North Dakota Industrial Commission, Oil and Gas Divisioin | Open Energy  

Open Energy Info (EERE)

North Dakota Industrial Commission, Oil and Gas Divisioin North Dakota Industrial Commission, Oil and Gas Divisioin Jump to: navigation, search State North Dakota Name North Dakota Industrial Commission, Oil and Gas Divisioin Address 600 East Boulevard Ave Dept 405 City, State Bismarck, North Dakota Zip 58505-0840 Website https://www.dmr.nd.gov/oilgas/ Coordinates 46.8206977°, -100.7827515° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.8206977,"lon":-100.7827515,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

397

Real-time wind turbine emulator suitable for power quality and dynamic control studies, MASc Thesis  

E-Print Network (OSTI)

Abstract Wind turbines are increasingly becoming significant components of power systems. To evaluate competing wind energy conversion technologies, a real-time Wind Turbine Emulator, which emulates the dynamic torque produced by an actual turbine has been developed. This is necessary since the real world performance of a wind turbine, subjected to variable wind conditions is more difficult to evaluate than a standard turbine generator system operating in near steady state. This emulator is capable of reproducing both the static and dynamic torque of an actual wind turbine. It models the torque oscillations caused by wind shear, tower shadow, and the obvious pulsations caused by variable wind speed. Also included are the dynamic effects of a large turbine inertia. This emulator will allow testing without the costly construction of the actual turbine blades and tower to determine the strengths and weaknesses of competing energy conversion and control technologies.

Dale S. L. Dolan; Student Member; P. W. Lehn; Member Ieee

2005-01-01T23:59:59.000Z

398

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Kern River Cogeneration

399

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Crockett Cogeneration

400

Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit  

SciTech Connect

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

NONE

1997-02-14T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NIST Blue Ribbon Commission on Management and Safety  

Science Conference Proceedings (OSTI)

... the Nuclear Regulatory Commission; the ... response; Environmental safety; Environmental remediation; and Security for hazardous ...

2013-06-12T23:59:59.000Z

402

Natural Gas Outlook - Presented to: Kansas Corporation Commission  

Reports and Publications (EIA)

Presented to: Kansas Corporation Commission, October 28, 2003, Presented by: William Trapmann, Energy Information Administration

Information Center

2003-11-01T23:59:59.000Z

403

PEPCO - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Commissioning: 50% of cost Enhanced Commissioning: $20,000 Energy Savings Study Incentive: $20,000 All Incentives: $250,000/account/year for custom, prescriptive, commissioning and O&M Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $12,000 or $0.06/sq. ft.

404

Dream controller  

SciTech Connect

A method and apparatus for intelligently controlling continuous process variables. A Dream Controller comprises an Intelligent Engine mechanism and a number of Model-Free Adaptive (MFA) controllers, each of which is suitable to control a process with specific behaviors. The Intelligent Engine can automatically select the appropriate MFA controller and its parameters so that the Dream Controller can be easily used by people with limited control experience and those who do not have the time to commission, tune, and maintain automatic controllers.

Cheng, George Shu-Xing; Mulkey, Steven L; Wang, Qiang; Chow, Andrew J

2013-11-26T23:59:59.000Z

405

Hutchinson Utilities Commission - Commercial Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hutchinson Utilities Commission - Commercial Energy Efficiency Hutchinson Utilities Commission - Commercial Energy Efficiency Program Hutchinson Utilities Commission - Commercial Energy Efficiency Program < Back Eligibility Commercial Fed. Government Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Other Heat Pumps Commercial Lighting Lighting Manufacturing Maximum Rebate $2,000 Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount Lighting: $300 per kW saved LED Exit Signs: $12 Occupancy Sensors: $20 - $40 Air Conditioning Systems: $20 - $40 per ton Air-Source Heat Pumps: $65 - $150 per ton Geothermal Heat Pumps: $150 per ton Chillers: $3,000 - $4,000, depending on size Chilled Water Resets: $350 - $900, depending on type and size

406

California Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 505 Van Ness Avenue Place San Francisco, California Zip 94102 Phone number 415-703-2782 Website http://www.cpuc.ca.gov/puc/ References CPUC Website[1] This article is a stub. You can help OpenEI by expanding it. California Public Utilities Commission is an organization based in San Francisco, California. The CPUC regulates privately owned electric, natural gas, telecommunications, water, railroad, rail transit, and passenger transportation companies, in addition to authorizing video franchises. Our five Governor-appointed Commissioners, as well as our staff, are dedicated to ensuring that consumers have safe, reliable utility service at reasonable rates, protecting against fraud, and promoting the health of California's economy.

407

Example Retro-Commissioning Statement of Work  

NLE Websites -- All DOE Office Websites (Extended Search)

11.3 11.3 Example Retro-Cx Scope of Work Example Retro-Commissioning Scope of Work To Include Services As Part of Super ESPC Detailed Energy Survey Background Agency requests that ESCo perform retro-commissioning services 1 , as detailed herein, as a part of performing the Detailed Energy Survey (DES) for site. The incremental cost for these services will be covered as a part of the project development cost for the Super ESPC project, whether or not viable measures are identified and ultimately implemented. It is the intent of the Agency to expand the work that will be performed during the DES. Leveraging the DES to complete a thorough scoping of retro-commissioning opportunities will substantially enhance the value of the ESCO services by ensuring that

408

UNITED STATES NUCLEAR REGULATORY COMMISSION  

Office of Legacy Management (LM)

WASHINGTON, 0. C. 20555 WASHINGTON, 0. C. 20555 AUG i 3 1979 ,,~---Y--*. FCAF:Wi3 )I 70-364 : i: SNM-414,jAmendment No. 3 --A Babcock and Wilcox Company Nuclear Materials Division ATTN: Mr. Michael A. Austin Manager, Technical Control 609 North Warren Avenue Apollo, Pennsylvania 15613 Gentiemen: (1 i' \ (. \ In accordance with your application dated June 18, 1979, and pursuant to Title 10, Code of Federal Regulations, Part 70, Materials License SNM-414 is hereby amended to: 1. Delete the function of the Regulatory Projects Coordinator, and 2. Alter the experience requirements for the function of Licensing and Nuclear Safety Specialist. Replacement pages for the license and condition section of the application are attached. Included are changes to License SNM-414 pages to reflect

409

Installation and Commissioning Automated Demand Response Systems  

Science Conference Proceedings (OSTI)

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

2008-04-21T23:59:59.000Z

410

Overview of PIER-Funded Existing Building Commissioning and Diagnostics Research  

E-Print Network (OSTI)

The California Energy Commission's Public Interest Energy Research (PIER) Program supports research and development that helps improve the quality of life in California by bringing environmentally safe, affordable, and reliable energy services and products to the marketplace. The PIER Program awards up to $62 million annually and has funded some of the most promising energy research in the U.S. The PIER Buildings program area seeks to decrease building energy use through research that develops or improves energy efficient technologies, strategies, tools, and building performance evaluation methods. This paper summarizes the accomplishments of projects within the PIER Buildings Program related to existing building commissioning and diagnostics between 1999 and 2003.

Jenkins, N.; Brook, M.

2003-01-01T23:59:59.000Z

411

Commissioning of the ATLAS Pixel Detector  

E-Print Network (OSTI)

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008. It is currently in a commissioning phase using cosmic-ray events. We present the highlights of the past and future commissioning activities of the ATLAS pixel system.

J. -F. Arguin; for the ATLAS Pixel Collaboration

2008-10-16T23:59:59.000Z

412

LHCb commissioning and readiness for first data  

E-Print Network (OSTI)

LHCb has been installed by spring 2008, followed by intensive testing and commissioning of the system in order to be ready for first data taking. Despite the horizontal geometry of the LHCb detector it was possible to collect over one million useful cosmic events that allowed a first time alignment of the sub-detectors. Moreover events from beam dumps during the LHC synchronisation tests provided very useful data for further time and spacial alignment of the detector. Here we present an overview of our commissioning activities, the current status and an outlook on the startup in 2009.

Helge Voss; for the LHCb Collaboration

2009-06-08T23:59:59.000Z

413

Commissioning an animal preference chamber for behavioral studies with laying hens exposed to atmospheric ammonia  

Science Conference Proceedings (OSTI)

An environmental preference chamber (EPC) with four double-tiered compartments (C1-C4), each capable of being controlled to distinct ammonia (NH"3) concentrations and temperature, was designed, fabricated and commissioned. Preference chambers are commonly ... Keywords: Ambient conditions, Animal welfare, Automatic control, Cross-contamination

G. T. Sales, A. R. Green, R. S. Gates

2013-07-01T23:59:59.000Z

414

Nuclear Regulatory Commission issuances, August 1987  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1987-08-01T23:59:59.000Z

415

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report January 2009 #12;2 California Solar Initiative CPUC Staff Progress Report - January 2009 The California Public progress on the California Solar Initiative, the country's largest solar incentive program. In January 2007

416

Our Purpose and Direction Forestry Commission Wales  

E-Print Network (OSTI)

Corporate Our Purpose and Direction Forestry Commission Wales: Corporate Plan 2012 to 2015 #12;Ministers Foreword I am very pleased to be providing the foreword for `Our purpose and direction beyond the 50-year lifespan of Woodlands for Wales. Our Purpose and Direction John Griffiths AM Minister

417

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the total energy they use, and California has a long history of leading the push to improve the energyCalifornia Energy Commission DRAFT STAFF REPORT ACHIEVING ENERGY SAVINGS IN CALIFORNIA BUILDINGS Saving Energy in Existing Buildings and Achieving a ZeroNetEnergy Future JULY 2011 CEC4002011007SD

418

Distributed Energy System Validation, Commissioning and  

E-Print Network (OSTI)

Distributed Energy System Validation, Commissioning and Qualification Test Report Prepared Agreement No. DE-FC26-06NT42847 Hawai`i Distributed Energy Resource Technologies for Energy Security Subtask for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative

419

The California Energy Commission and Its Programs  

E-Print Network (OSTI)

supply of competitively priced energy. The state is a world leader in energy research and development energy supply/demand and keeping historical energy data. · Licensing and monitoring the constructionThe California Energy Commission and Its Programs A Public Information Guide Prepared by the Public

420

California Energy Commission Pipeline Integrity Technology  

E-Print Network (OSTI)

California Energy Commission Pipeline Integrity Technology Demonstration Grant California Energy Solicitation Scope · The purpose of this solicitation is to demonstrate natural gas pipeline inspection using low cost/low power sensors ­ Improvement of existing pipeline inspection technology to identify

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

California Energy Commission GUIDANCE ON WASTE  

E-Print Network (OSTI)

California Energy Commission GUIDANCE GUIDANCE ON WASTE MANAGEMENT PLANS FOR ENERGY EFFICIENCY passed upon the accuracy or adequacy of the information in this report. #12;GUIDANCE ON WASTE MANAGEMENT) obtain waste management plans for each proposed project receiving funding under the Energy Efficiency

422

ARM - Data Quality Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Program Quality Program DQ Resources Data Quality Assessment and Control Report (PDF, 747KB) Data Quality Office Data Quality Problem Reporting (DQPR) Contact Us Submit Data Quality Findings Randy Peppler, Data Quality Manager Ken Kehoe, Data Quality Specialist Justin Monroe, Data Quality Specialist Adam Theisen, Data Quality Specialist Sean Moore, Data Quality Consultant Instrument and Site Contacts Instrument Mentors AAF Contacts AMF Contacts NSA Site Contacts SGP Site Contacts TWP Site Contacts Data Quality Program Introduction One of the goals of the ARM Climate Research Facility is to provide datastreams of quality suitable for scientific research. Maintaining data quality for an organization program of the size and complexity of the ARM Facility is a significant challenge; efforts toward this end have matured

423

ABBREVIATIONS AND ACRONYMS AEC U.S. Atomic Energy Commission  

Office of Legacy Management (LM)

ABBREVIATIONS AND ACRONYMS ABBREVIATIONS AND ACRONYMS AEC U.S. Atomic Energy Commission CEDE committed effective dose equivalent CERCLA Comprehensive Environmental Response, Compensation, and Liability Act cpm counts per minute DCGL w Derived Concentration Guideline Limit DOE U.S. Department of Energy dpm disintegrations per minute DQO Data Quality Objectives EPA Environmental Protection Agency FUSRAP Formerly Utilized Sites Remedial Action Program H 0 Null Hypothesis IAEA International Atomic Energy Agency IDNS Illinois Department of Nuclear Safety K-40 Potassium-40 LBGR Lower Bound of Gray Region MARSSIM Multi-Agency Radiation Survey and Site Investigation Manual NaI sodium iodide ORNL Oak Ridge National Laboratory pCi/g picoCuries per gram RPD Relative Percent Difference SAIC Science Applications International Corporation

424

New process modeling [sic], design, and control strategies for energy efficiency, high product quality, and improved productivity in the process industries. Final project report  

SciTech Connect

This project was concerned with the development of process design and control strategies for improving energy efficiency, product quality, and productivity in the process industries. In particular, (i) the resilient design and control of chemical reactors, and (ii) the operation of complex processing systems, was investigated. Specific topics studied included new process modeling procedures, nonlinear controller designs, and control strategies for multiunit integrated processes. Both fundamental and immediately applicable results were obtained. The new design and operation results from this project were incorporated into computer-aided design software and disseminated to industry. The principles and design procedures have found their way into industrial practice.

Ray, W. Harmon

2002-06-05T23:59:59.000Z

425

Department of EneDepartment of Energy Quality Assurance: Design Control for the Waste Treatment and Immobilization Plant at the Hanford Sitergy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Quality Department of Energy Quality Assurance: Design Control for the Waste Treatment and Immobilization Plant at the Hanford Site DOE/IG-0894 September 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 September 30, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Department of Energy Quality Assurance: Design Control for the Waste Treatment and Immobilization Plant at the Hanford Site" INTRODUCTION AND OBJECTIVE The Department of Energy is constructing the $12.2 billion Waste Treatment and Immobilization Plant (WTP) to vitrify approximately 56 million gallons of radioactive and chemically hazardous

426

Melt Quality Control  

Science Conference Proceedings (OSTI)

Mar 2, 2011 ... In-Line Salt-ACDTM: A ChlorineFree Technology for Metal Treatment: Patrice Robichaud1; Claude Dupuis1; Alain Mathis2; Pascal Cot3;...

427

Nanotube Quality Control  

Science Conference Proceedings (OSTI)

... A variety of coating techniques can be used to deposit the nanotube material, including drop casting, spin coating, and spray deposition. ...

2012-11-13T23:59:59.000Z

428

Requirements for Commissioning HVAC Systems Using BEMS and Commissioning the BEMS Itself Based on Questionnaire Surveys  

E-Print Network (OSTI)

In this paper the present status and requirements for commissioning of HVAC Systems using Building Energy Management Systems (BEMS) and commissioning the BEMS itself are investigated and summarized. The information presented is based on the results of the questionnaire and interview survey of experts which was carried out in four countries; Japan, the USA, France and Canada. This paper intends to clarify the requirements and future scope of the above issues by analyzing similarities and differences between the countries.

Yoshida, H.; Vaezi-Nejad, H.; Choiniere, D.; Wang, F.

2004-01-01T23:59:59.000Z

429

Blue Ribbon Commission on America's Nuclear Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Nuclear Future Blue Ribbon Commission on America's Nuclear Future Agenda March 25 - 26, 2010 Willard Intercontinental Hotel, Washington, DC Thursday, March 25, 2010 Open Meeting - Grand Ballroom 11:00 a.m. Open meeting/review agenda Tim Frazier 11:10 a.m. Opening comments from Secretary Chu 11:25 a.m. Opening discussion - Co-chairs Honorable Lee Hamilton General Brent Scowcroft 11:35 a.m. Opening discussion - members Honorable Pete Domenici Honorable Chuck Hagel Honorable Phil Sharp Mr. Mark H. Ayers Honorable Vicky Bailey Dr. Albert Carnesale Ms. Susan Eisenhower Mr. Jonathan Lash Dr. Allison Macfarlane Dr. Richard A. Meserve Dr. Ernie Moniz Mr. John Rowe Dr. Per F. Peterson 12:30 p.m. Lunch

430

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555  

Office of Legacy Management (LM)

REGULATORY COMMISSION REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 2 2 1982 -/ Departmznt'of Ene,rgy ATTN : Dr. William E. Mott, Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. Mott: Enclosed is the list of contaminated'or potentially contaminated sites that I promised to send you during our recent meeting. The sites have been broken down into the followi,ng four categories: 1. Sites with known contamination that have never been 1 icensed. 2. Formerly licensed sites with known contamination. 3. Currently licensed sites that are being decontaminated prior to decoronissioning. 4. A list of formerly licensed sites that need to be visited to determine if they have been properly decontaminated prior to decommissioning.

431

A History of the Atomic Energy Commission  

SciTech Connect

This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

Buck, A.L.

1983-07-01T23:59:59.000Z

432

Nuclear Regulatory Commission Information Digest, 1991 edition  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

Olive, K L

1991-03-01T23:59:59.000Z

433

Colorado Public Utility Commission's Xcel Wind Decision  

DOE Green Energy (OSTI)

In early 2001 the Colorado Public Utility Commission ordered Xcel Energy to undertake good faith negotiations for a wind plant as part of the utility's integrated resource plan. This paper summarizes the key points of the PUC decision, which addressed the wind plant's projected impact on generation cost and ancillary services. The PUC concluded that the wind plant would cost less than new gas-fired generation under reasonable gas cost projections.

Lehr, R. L. (NRUC/NWCC); Nielsen, J. (Land and Water Fund of the Rockies); Andrews, S.; Milligan, M. (National Renewable Energy Laboratory)

2001-09-20T23:59:59.000Z

434

Commissioning and Calibration of the ALICE TPC  

E-Print Network (OSTI)

ALICE (A Large Ion Collider Experiment) is the dedicated heavy ion experiment at the Large Hadron Collider at CERN. The main tracking device of ALICE is a large volume TPC. The milestones of the TPC commissioning as well as the current status of the detector calibration are presented. The obtained resolutions in transverse momentum, position as well as in specific energy loss (dE/dx) are presented and results from noise and electron drift velocity measurements are addressed.

J. Wiechula; for the ALICE TPC Collaboration

2009-07-24T23:59:59.000Z

435

Indexes to Nuclear Regulatory Commission Issuances  

SciTech Connect

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

NONE

1996-12-31T23:59:59.000Z

436

Delmarva - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Retro-Commissioning: $30,000 Commissioning: 50% of cost Enhanced Commissioning: 20,000 All Incentives: 250,000/account/year and 500,000/customer for custom, prescriptive, commissioning and OandM Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $0.02/sq ft or $4,000 (Development); $0.06/sq ft or

437

Colorado Oil and Gas Commission - Production Data (Jan - Mar...  

Open Energy Info (EERE)

Colorado Oil and Gas Commission - Production Data (Jan - Mar 2011) The Colorado Oil and Gas Commission is the place where Colorado oil, gas, and geothermal data is stored and made...

438

Ex Parte Meeting between DOE and California Energy Commission...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57 Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57...

439

Roanoke River Basin Bi-State Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Roanoke River Basin Bi-State Commission was established as a bi-state commission composed of members from the Commonwealth of Virginia and the State of North Carolina.The purpose of the...

440

Ex parte communication of the California Energy Commission- Docket...  

NLE Websites -- All DOE Office Websites (Extended Search)

communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 On...

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Report of the State of Nevada Commission on Nuclear Projects  

SciTech Connect

This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission`s functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts.

1990-12-01T23:59:59.000Z

442

Underground Injection Control Permits and Registrations (Texas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Underground Injection Control Permits and Registrations (Texas) Underground Injection Control Permits and Registrations (Texas) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Fuel Distributor Savings Category Buying & Making Electricity Program Info State Texas Program Type Environmental Regulations Safety and Operational Guidelines Provider Texas Commission on Environmental Quality Chapter 27 of the Texas Water Code (the Injection Well Act) defines an "injection well" as "an artificial excavation or opening in the ground made by digging, boring, drilling, jetting, driving, or some other

443

Commissioning and Diagnosis of VAV Air-Conditioning Systems  

E-Print Network (OSTI)

This paper presents a fault detection and diagnosis (FDD) strategy based on system knowledge, qualitative states and object-oriented statistical process control (SPC) models for typical pressure-independent variable air volume (VAV) air-conditioning systems. Eight FDD schemes are built to detect the eleven pre-defined VAV faults using the qualitative and quantitative FDD approaches within the strategy at two steps. The ten hard faults, which would affect the system operation, are analyzed at Step 1. The soft fault, which would not affect the basic system operation but would impact the supervisory controls, is analyzed at Step 2. The strategy is tested and validated on typical VAV systems involving multiple faults, both in simulation and in-situ tests. A software package is developed as a BMS-assisted automatic commissioning tool based on the FDD strategy. Off-line tests were conducted in both the simulated building and the real building.

Qin, J.; Wang, S.; Chan, C.; Xiao, F.

2006-01-01T23:59:59.000Z

444

Design, Commissioning and Operational Aspects of a Novel Oxalate ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Design, Commissioning and...

445

Preliminary State-of-the-Art Review for Commissioning Low ...  

Science Conference Proceedings (OSTI)

... a literature review of commissioning and operational experience with existing buildings that were designed to have low energy consumption. ...

2008-02-14T23:59:59.000Z

446

GRR/Section 14-TX-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

TX-c - Underground Injection Control Permit TX-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-TX-c - Underground Injection Control Permit Pages from 14TXCUndergroundInjectionControlPermit (4).pdf Click to View Fullscreen Contact Agencies Railroad Commission of Texas Texas Commission on Environmental Quality Regulations & Policies Tex. Water Code § 27 16 TAC 3.9 46 TAC 3.46 16 TAC 3.30 - MOU between the RRC and the TCEQ Triggers None specified Click "Edit With Form" above to add content Pages from 14TXCUndergroundInjectionControlPermit (4).pdf Pages from 14TXCUndergroundInjectionControlPermit (4).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

447

THE NATIONAL COMMISSION ON ENERGY POLICY December 2004  

E-Print Network (OSTI)

THE NATIONAL COMMISSION ON ENERGY POLICY December 2004 ENDING THE ENERGY STALEMATE A Bipartisan THE NATIONAL COMMISSION ON ENERGY POLICY December 2004 www.energycommission.org #12;PREAMBLE This report. ACKNOWLEDGEMENTS The National Commission on Energy Policy was founded in 2002 by the William and Flora Hewlett

Laughlin, Robert B.

448

California Energy Commission Technical Assistance for the Alternative and  

E-Print Network (OSTI)

California Energy Commission 1 Technical Assistance for the Alternative and Renewable Fuel and Vehicle Technology (ARFVT) Program California Energy Commission Request for Proposals RFP # 600-12-604 Pre-Bid Conference Date: January 23, 2013 #12;California Energy Commission AGENDA 10:00 Welcome and Introductions

449

European Commission Air pollution research report No 81  

E-Print Network (OSTI)

the European Commission nor any person acting on behalf of the Commission is responsible for the use which to the authors, the reviewers, the editorial board and the editor for their hard work in preparing this report. I General European Commission #12;#12;CONTENTS Pages PREFACE 3 CONTENTS 5 EDITORS, AUTHORS AND REVIEWERS 9

450

Kansas Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Kansas Oil and Gas Conservation Commission Jump to: navigation, search State Kansas Name Kansas Oil and Gas Conservation Commission Address 1500 SW Arrowhead Road City, State Topeka, KS Zip 66604-4027 Website http://www.kcc.state.ks.us/con Coordinates 39.04059°, -95.756198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.04059,"lon":-95.756198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

451

Results from the commissioning of the ATLAS Pixel detector  

E-Print Network (OSTI)

The ATLAS Pixel detector is a high-resolution, low-noise silicon-based device designed to provide tracking and vertexing information within a distance of 12 cm from the LHC beam axis. It consists of approximately 80 million pixel channels with radiation-hard front-end electronics connected through optical fibers to a custom-controlled DAQ system away from the detector. Following the successful installation of the detector in June 2007, an intense commissioning period was conducted in the year 2008 and more than 400,000 cosmic-ray tracks were recorded in conjunction with other ATLAS sub-detectors. By the end of the year, 96% of the detector was tuned, calibrated, and taking data at 99.8% tracking hit efficiency and with noise occupancy at the 10^-10 level. We present here the results of the commissioning, calibration, and data-taking as well as the outlook for future performance with LHC collision-based data.

J. Biesiada; for the ATLAS Collaboration

2009-05-25T23:59:59.000Z

452

Commissioning of the SNS front-end systems at Berkeley Lab  

E-Print Network (OSTI)

COMMISSIONING OF THE SNS FRONT-END SYSTEMS AT BERKELEY LAB*Details of other MEBT commissioning efforts, especiallywere provided by LANL. Commissioning topics included beam

2002-01-01T23:59:59.000Z

453

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

Case Study: Supermarket Commissioning with an Emphasis onNational Conference on Building Commissioning, May 18-20,Building Enclosure Commissioning: What's the Big Deal?"

Mills, Evan

2010-01-01T23:59:59.000Z

454

Advanced Design and Commissioning Tools for Energy-Efficient Building Technologies  

E-Print Network (OSTI)

pp. 728733. Chapter 2: Commissioning guidelines for UFAD2.0 To accomplish commissioning of UFAD system, specificprocedure for use by commissioning agents and other building

Bauman, Fred; Webster, Tom; Zhang, Hui; Arens, Ed

2012-01-01T23:59:59.000Z

455

Design and Commissioning Plan for a Laser Heater for FERMI@elettra  

E-Print Network (OSTI)

F TN-08/13 Design and Commissioning Plan for a Laser Heateroperational guidelines for commissioning. Disclaimer Thisto be important for commissioning and for emittance

Zholents, Alexander A.

2008-01-01T23:59:59.000Z

456

Salsbury and Diamond: Automated Testing of HVAC Systems for Commissioning -1 -Automated Testing of HVAC Systems for Commissioning  

E-Print Network (OSTI)

and Diamond: Automated Testing of HVAC Systems for Commissioning - 1 - Automated Testing of HVAC Systems This paper describes an approach to the automation of the commissioning of HVAC systems. The approach of many HVAC systems is limited more by poor installation, commissioning, and maintenance than by poor

457

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

458

Public Service Commission Authorization to Utilize an Alternative Method of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Service Commission Authorization to Utilize an Alternative Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Mississippi Program Type Green Power Purchasing Industry Recruitment/Support Performance-Based Incentive Public Benefits Fund Provider Public Service Commission The Senate Bill 2793 authorizes the Public Service Commission (PSC) to

459

Interstate Commission on the Potomac River Basin (Multiple States) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

460

The ATLAS Trigger System Commissioning and Performance  

E-Print Network (OSTI)

The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

A. Hamilton

2010-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Status and Commissioning of the CMS Experiment  

E-Print Network (OSTI)

After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction and installation is described in the first part of the note. The second part of the document is devoted to a discussion of the general commissioning strategy of the CMS experiment, with a particular emphasis on trigger, calibration and alignment. Aspects of b-physics, as well as examples for early physics with CMS are also presented. CMS will be ready for data taking in time for the first collisions in the Large Hadron Collider (LHC) at CERN in late 2007.

O. Buchmueller; F. -P. Schilling

2007-01-11T23:59:59.000Z

462

Commissioning of the ATLAS Liquid Argon Calorimeter  

E-Print Network (OSTI)

The in-situ commissioning of the ATLAS liquid argon calorimeter is taking place since three years. During this period, it has been fully tested by means of frequent calibration runs, and the analysis of the large cosmic muon data samples and of the few beam splash events that occurred on September 10th, 2008. This has allowed to obtain a stable set of calibration constants for the first collisions, and to measure the in-situ calorimeter performances that were found to be at the expected level.

S. Laplace

2010-05-17T23:59:59.000Z

463

Commissioning of SLAC SLD 45-Degree Chambers  

E-Print Network (OSTI)

The SLD experiment at the Stanford Linear Accelerator Center had a significant gap in its muon tracking coverage, provided by the Warm Iron Calorimeter. Supplemental planes of limited streamer tube chambers were added to improve the coverage in the vicinity of the gap at 0.65 commissioning of the forty-five degree chamber region of the SLAC SLD Warm Iron Calorimeter is presented. This task involved the completion of the forty-five degree chamber region geometry for the Warm Iron Calorimeter's fitter and swimmer and the changing of the way multiple scattering effects are treated in the fitter algorithm.

V. O. Eschenburg

2002-07-30T23:59:59.000Z

464

Commissioning of the ATLAS Muon Trigger Selection  

E-Print Network (OSTI)

The performance of the three-level ATLAS muon trigger as evaluated by using LHC data is presented. Events have been selected by using only the hardware-based Level-1 trigger in order to commission and to subsequently enable the (software-based) selections of the High Level Trigger. Studies aiming at selecting prompt muons from J/{\\psi} and at reducing non prompt muon contamination have been performed. A brief overview on how the muon triggers evolve with increasing luminosity is given.

Musto, Elisa

2010-01-01T23:59:59.000Z

465

Commissioning of the ATLAS Muon Trigger Selection  

E-Print Network (OSTI)

The performance of the three-level ATLAS muon trigger as evaluated by using LHC data is presented. Events have been selected by using only the hardware-based Level-1 trigger in order to commission and to subsequently enable the (software-based) selections of the High Level Trigger. Studies aiming at selecting prompt muons from J/{\\psi} and at reducing non prompt muon contamination have been performed. A brief overview on how the muon triggers evolve with increasing luminosity is given.

Elisa Musto

2010-09-30T23:59:59.000Z

466

Commissioning of the ATLAS pixel detector  

SciTech Connect

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

ATLAS Collaboration; Golling, Tobias

2008-09-01T23:59:59.000Z

467

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

Braun (Purdue). 2004. Peak demand reduction from pre-coolingthe average and maximum peak demand savings. The electricityuse charges, demand ratchets, peak demand charges, and other

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

468

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects Title Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects Publication Type Report LBNL Report Number LBNL-1972E Year of Publication 2009 Authors Mills, Evan, and Paul A. Mathew Call Number LBNL-1972E Abstract HVAC systems that are designed without properly accounting for equipment load variation across laboratory spaces in a facility can significantly increase simultaneous heating and cooling, particularly for systems that use zone reheat for temperature control. This best practice guide describes the problem of simultaneous heating and cooling resulting from load variations, and presents several technological and design process strategies to minimize it.

469

UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO  

Office of Legacy Management (LM)

OF AMERICA OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO TRANSFER,DELIVER,EXPORT,OR RECEIVE URANIUM ORTHORIUM SOURCE MATERIAL Pursuant to Code of Federal Regulations. Title II- Atomic Energy. Part IO-Control of Source Material Form approved Budget Bureau No. 3%RO02.2. 2. PREVIOUS AEC LICENSE NUMBER, IF ANY. R-103 _..._............_.~_~~......~~~.....~.. INSTRUCTIONS File two (2) copies of this application with the U. S. Atomic Energy Commission, P. 0. Box 30, Ansonia Station, New York 23, N. Y. This application may be used for an original license or for the renewal of a license. In the case of a rrnewal, this application should be received by the Commission on or before 30 days before the expiration of the previous license. Complete blocks 1, 2, 3, 9. and if

470

OPERATION AND COMMISSIONING OF THE JEFFERSON LAB UV FEL USING AN SRF DRIVER ERL  

Science Conference Proceedings (OSTI)

We describe the operation and commissioning of the Jefferson Lab UV FEL using a CW SRF ERL driver. Based on the same 135 MeV linear accelerator as the Jefferson Lab 10 kW IR Upgrade FEL, the UV driver ERL uses a bypass geometry to provide transverse phase space control, bunch length compression, and nonlinear aberration compensation necessitating a unique set of commissioning and operational procedures. Additionally, a novel technique to initiate lasing is described. To meet these constraints and accommodate a challenging installation schedule, we adopted a staged commissioning plan with alternating installation and operation periods. This report addresses these issues and presents operational results from on-going beam operations.

R. Legg; S. Benson; G. Biallas; K. Blackburn; J. Boyce; D. Bullard; J. Coleman; C. Dickover; D. Douglas; F. Ellingsworth; P. Evtushenko; F. Hannon; C. Hernandez-Garcia; C. Gould; J. Gubeli; D. Hardy; K. Jordan; M. Klopf; J. Kortze; M. Marchlik; W. Moore; G. Neil; T. Powers; D. Sexton; Michelle D. Shinn; C. Tennant; R. Walker; G. Wilson

2011-03-01T23:59:59.000Z

471

A Case Study of Retro Commissioning in a Standard Commercial Office Building in Japan  

E-Print Network (OSTI)

This paper describes retro commissioning of a standard commercial office building in Japan. The owner's expectations for retro commissioning are realization of energy and cost savings, and controlling the increase in electric power demand, while continuing use of most existing equipment, and maintenance of high efficiency operation. First, the performance of the existing equipment was checked using the BEMS during retro commissioning program phase. Next, optimal selection of a system and heat source equipment was performed using the simulation in the design phase. Furthermore, the verification of the performance of the refrigeration machine installed was carried out as a Functional Performance Test. And the economic effect by a repair work was verified during the operation phase. The simple payback of the project was about six years.

Kamitani, K.; Shimazu, M.; Inomata, N.

2006-01-01T23:59:59.000Z

472

Ozone Modeling for Compliance Planning: A Synopsis of "The Use of Photochemical Air Quality Models for Evaluating Emission Control Strategies--A Synthesis Report"  

Science Conference Proceedings (OSTI)

The 1990 Clean Air Act Amendments require that many nonattainment areas use gridded, photochemical air quality models to develop compliance plans for meeting the ambient ozone standard. This report reviews the status of photochemical air models--the computer simulation programs that will be used to set emission control programs to meet ground level (tropospheric) ozone standards currently in use for regulatory planning. Regulatory application guidelines are discussed, as are the limitations and reliabili...

1993-02-01T23:59:59.000Z

473

United Nations Economic and Social Commission for Western Asia | Open  

Open Energy Info (EERE)

Asia Asia Jump to: navigation, search Name United Nations Economic and Social Commission for Western Asia Address P.O. Box 11-8575, Riad el-Solh Square, Beirut, Lebanon Place Beirut, Lebanon Year founded 1973 Phone number + 961-1- 981301 Website http://www.escwa.un.org/index. Coordinates 33.8966729°, 35.5030977° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.8966729,"lon":35.5030977,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

474

Nebraska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

State Nebraska State Nebraska Name Nebraska Oil and Gas Conservation Commission Address 922 Illinois City, State Sidney, Nebraska Zip 69162 Website http://www.nogcc.ne.gov/ Coordinates 41.1449288°, -102.9758174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.1449288,"lon":-102.9758174,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

475

Colorado Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

State Colorado State Colorado Name Colorado Oil and Gas Commission Address 1120 Lincoln Street, Suite 801 City, State Denver, CO Zip 80203 Website http://cogcc.state.co.us/ Coordinates 39.734421°, -104.985764° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.734421,"lon":-104.985764,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

476

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Jr., Governor MAY 2012 CEC3002012003CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN

477

February 2008 In 2003, the California Public Utilities Commission, the California Energy Commission, and the California  

E-Print Network (OSTI)

prepared the update using the information and analysis prepared for the recent IEPR, as well as recent· Renewable energy· Electricity reliability and infrastructure· Electricity market structure· Natural gas#12;February 2008 In 2003, the California Public Utilities Commission, the California Energy

478

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase  

Open Energy Info (EERE)

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Abstract N/A Author U.S. Geothermal Inc. Published Publisher Not Provided, 2010 Report Number N/A DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Citation U.S. Geothermal Inc.. 2010. Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement. Boise Idaho: (!) . Report No.: N/A. Retrieved from "http://en.openei.org/w/index.php?title=Idaho_Public_Utilities_Commission_Approves_Neal_Hot_Springs_Power_Purchase_Agreement&oldid=682748"

479

Natural Gas Regulation - Delaware Public Service Commission (Delaware) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Regulation - Delaware Public Service Commission Natural Gas Regulation - Delaware Public Service Commission (Delaware) Natural Gas Regulation - Delaware Public Service Commission (Delaware) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Fuel Distributor Program Info State Delaware Program Type Generating Facility Rate-Making Provider Delaware Public Service Commission The Delaware Public Service Commission regulates only the distribution of natural gas to Delaware consumers. The delivery and administrative costs associated with natural gas distribution are determined in base rate proceedings before the Commission. The recovery of costs associated with the natural gas used by customers is determined annually as part of fuel adjustment proceedings. As a result of this process, rates for natural gas

480

Notices Safety Commission, 4330 East West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Federal Register 0 Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504-7923. Dated: January 10, 2012. Todd A Stevenson, Secretary. [FR Doc. 2012-625 Filed 1-10-12; 4:15 pm] BILLING CODE 6355-01-P CORPORATION FOR NATIONAL AND COMMUNITY SERVICE Information Collection; Submission for OMB Review, Comment Request AGENCY: Corporation for National and Community Service. ACTION: Notice. SUMMARY: The Corporation for National and Community Service (the Corporation), has submitted a public information collection request (ICR) entitled Day of Service Project Promotion Tool for review and approval in accordance with the Paperwork Reduction Act of 1995, Public Law 104- 13, (44 U.S.C. chapter 35). Copies of this

Note: This page contains sample records for the topic "quality control commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

FTC data analysis. [Federal Trade Commission  

SciTech Connect

Manufacturers of 5 major consumer products submitted energy efficiency and related data to the Federal Trade Commission during late 1979 and early 1980 in response to energy-efficiency labeling and representations requirements. This report documents an analysis of these data as conducted by Vitro Laboratories. Data were submitted on five products: furnaces, water heaters, room air conditioners, refrigerators and refrigerator-freezers, and freezers. The submittals include information on manufacturer model number, estimated annual energy cost or the energy-efficiency rating, the number of tests performed on each basic model, and the capacity of each appliance model. Pattern analyses on these variables are presented, but it is observed that few common patterns for the five products exist. The unique patterns for each product are discussed.

Not Available

1981-02-11T23:59:59.000Z

482

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATES OF AMERICA STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project

483

Delaware River Basin Commission (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

484

Lake George Park Commission: Stormwater Management (New York) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake George Park Commission: Stormwater Management (New York) Lake George Park Commission: Stormwater Management (New York) Lake George Park Commission: Stormwater Management (New York) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider Lake George Park Commission

485

The International Heat Flow Commission | Open Energy Information  

Open Energy Info (EERE)

The International Heat Flow Commission The International Heat Flow Commission Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: The International Heat Flow Commission Details Activities (1) Areas (1) Regions (0) Abstract: Unavailable Author(s): A. E. Beck, V. Cermak Published: Geothermics, 1989 Document Number: Unavailable DOI: Unavailable Source: View Original Journal Article Data Acquisition-Manipulation (Beck & Cermak, 1989) Unspecified Retrieved from "http://en.openei.org/w/index.php?title=The_International_Heat_Flow_Commission&oldid=387748" Category: Reference Materials What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863774514

486

Alaska Oil and Gas Conservation Commission: February 2011 Drilling...  

Open Energy Info (EERE)

Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas...

487

Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Explosions As part of the Plowshare program seeking to develop peaceful uses for nuclear explosives, the Atomic Energy Commission conducts the Sedan test at the Nevada...

488

Department of Energy and Nuclear Regulatory Commission Increase Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP) through a Memorandum of Understanding (MOU) that was signed on Friday by DOE's GNEP Deputy Program Manager Paul Lisowski and NRC Executive Director for Operations Luis Reyes. The MOU establishes the foundation for increased cooperation between DOE and NRC on technological research and engineering studies and marks another important milestone

489

Ohio River Greenway Development Commission (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Environmental Regulations Siting and Permitting Provider Ohio River Greenway Commission

490

River Basins Advisory Commissions (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Environmental Regulations Provider Catawba Wateree River Basin Advisory Commission

491

The Carnegie Commission and Council on Higher Education: A Retrospective  

E-Print Network (OSTI)

AND COUNCIL ON HIGHER EDUCATION: A RETROSPECTIVE * Novemberfor Studies in Higher Education, UC Berkeley Copyright 2005Carnegie Commission on Higher Education under the auspices

Douglass, John Aubrey

2005-01-01T23:59:59.000Z

492

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

of Fully Automated Demand Response in Large Facilities"Management and Demand Response in Commercial Buildings", L Band Commissioning Issues from an Automated Demand Response.

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

493

Hawaii Department of Land and Natural Resources Commission on...  

Open Energy Info (EERE)

icon Hawaii Department of Land and Natural Resources Commission on Water Resource Management Jump to: navigation, search Name Hawaii Department of Land and Natural Resources...

494

Update on Blue Ribbon Commission for America's Nuclear Future...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 Blue Ribbon Commission on...

495

Idaho Public Utilities Commission Approves Neal Hot Springs Power...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase...

496

Design and Commissioning of the Outotec Ausmelt TSL Copper ...  

Science Conference Proceedings (OSTI)

Presentation Title, Design and Commissioning of the Outotec Ausmelt TSL Copper Smelter at DNMC. Author(s), Chuanzhuan Liu, Baizhi Chen, Jun Wan,...

497

Commissioning and Optimisation of the New Lead and Silver ... - TMS  

Science Conference Proceedings (OSTI)

Aug 1, 2000 ... Commissioning and Optimisation of the New Lead and Silver Refinery at the Pasminco Port Pirie Smelter by P. Kapoulitsas, M. Giunti,...

498

Design and Commissioning of the Ausmelt TSL Lead Smelter at ...  

Science Conference Proceedings (OSTI)

Presentation Title, Design and Commissioning of the Ausmelt TSL Lead Smelter at Yunnan Tin Company Limited. Author(s), Helin Gu, Xingcheng Song, Xu Lan,...

499

Commissioning of a Vertical Direct Chill Caster for Producti  

Science Conference Proceedings (OSTI)

Aug 1, 2003 ... Commissioning of a Vertical Direct Chill Caster for Producti by J. Grandfield, C-C. Young, K. Oswald, and P. Baker...

500

Orlando Utilities Commission- Residential Solar Water Heater Rebate Program (Florida)  

Energy.gov (U.S. Department of Energy (DOE))

The Orlando Utilities Commission (OUC) offers residential electric customers a point-of-sale rebate of $1,000 for new solar water heating systems.