National Library of Energy BETA

Sample records for qa quality assurance

  1. CRAD, NNSA- Quality Assurance (QA)

    Broader source: Energy.gov [DOE]

    CRAD for Quality Assurance (QA). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  2. DMS release 2 quality assurance (QA) plan

    SciTech Connect (OSTI)

    Weidert, J.R.

    1997-01-17

    This document defines the QA activities that will be Pursued during the development of the WRAP I DMS Release 2 software.

  3. QA (quality assurance) at Fermilab; the hermeneutics of NQA-1

    SciTech Connect (OSTI)

    Bodnarczuk, M.

    1988-06-01

    This paper opens with a brief overview of the purpose of Fermilab and a historical synopsis of the development and current status of quality assurance (QA) at the Laboratory. The paper subsequently addresses some of the more important aspects of interpreting the national standard ANSI/ASME NQA-1 in pure research environments like Fermilab. Highlights of this discussion include, what is hermeneutics and why are hermeneutical considerations relevant for QA, a critical analysis of NQA-1 focussing on teleological aspects of the standard, a description of the hermeneutical approach to NQA-1 used at Fermilab which attempts to capture the true intents of the document without violating the deeply ingrained traditions of quality standards and peer review that have been foundational to the overall success of the paradigms of high-energy physics.

  4. SU-F-BRE-16: VMAT Commissioning and Quality Assurance (QA) of...

    Office of Scientific and Technical Information (OSTI)

    ICOM Test HarnessTM Citation Details In-Document Search Title: SU-F-BRE-16: VMAT Commissioning and Quality Assurance (QA) of An Elekta Synergy-STM Linac Using ICOM Test ...

  5. EM Quality Assurance Program (EM-QA-001 Revision 1)

    Broader source: Energy.gov [DOE]

    The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP).

  6. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Broader source: Energy.gov [DOE]

    Previous revision of the Environmental Management Quality Assurance Program. The program is the EM management system to ensure we"do work correctly." This document has been superseded by Revision 1...

  7. Quality assurance/quality control (QA/QC) procedures for hazardous-waste incineration. Handbook

    SciTech Connect (OSTI)

    Dux, T.; Gilford, P.; Bergman, F.; Boomer, B.; Hooton, D.

    1990-01-01

    The Environmental Protection Agency (EPA) has promulgated regulations for hazardous waste incinerators under the Resource Conservation and Recovery Act. These regulations require the permit applicant to conduct trial burns to demonstrate compliance with the regulatory limits and provide data needed to write the individual permits. Trial burns require a Quality Assurance Project Plan (QAPjP) with quality assurance/quality control (QA/QC) procedures to control and evaluate data quality. The primary focus of the handbook is the trial burn itself; however, a discussion of the QA/QC for routine incinerator monitoring and permit compliance is included in a separate chapter. The area has slightly different requirements and objectives from those of the trial burn. The trial burn should be viewed as a short-term project with a defined beginning and end, while compliance monitoring is considered an ongoing process.

  8. QA (Quality Assurance) role in advanced energy activities: Towards an /open quotes/orthodox/close quotes/ Quality Program: Canonizing the traditions at Fermilab

    SciTech Connect (OSTI)

    Bodnarczuk, M.W.

    1988-02-01

    After a brief description of the goal of Fermi National Accelerator Laboratory (Fermilab) this paper poses and answers three questions related to Quality Assurance (QA) at the Laboratory. First, what is the difference between 'orthodox' and 'unorthodox' QA and is there a place for 'orthodox' QA at a laboratory like Fermilab. Second, are the deeper philosophical and cultural frameworks of high-energy physics acommodating or antagonistic to an 'orthodox' QA Program. Finally, faced with the task of developing an institutional QA program for Fermilab where does one begin. The paper is based on experience with the on-going development and implementation of an institutional QA Program at Fermilab. 10 refs.

  9. Data Driven Quality Assurance and Quality Control

    Broader source: Energy.gov [DOE]

    "Data Driven Quality Assurance & Quality Control," Patrick Roche, Conservation Services Group. Provides an overview of data QA/QC system design.

  10. Quality Assurance Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1) to ensure all EM projects utilize a consistent quality assurance approach. PDF icon Quality Assurance Policy, Revision 1 PDF icon EM Quaility Assurance Program (EM-QA-001 ...

  11. Quality Assurance Manual

    SciTech Connect (OSTI)

    McGarrah, J.E.

    1995-05-01

    In order to provide clients with quality products and services, Pacific Northwest Laboratory (PNL) has established and implemented a formal quality assurance program. These management controls are documented in this manual (PNL-MA-70) and its accompanying standards and procedures. The QA Program meets the basic requirements and supplements of ANSI/ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities, as interpreted for PNL activities. Additional, the quality requirements are augmented to include the Total Quality approach defined in the Department of Energy Order 5700.6C, Quality Assurance. This manual provides requirements and an overview of the administrative procedures that apply to projects and activities.

  12. EM Quality Assurance Assessment Schedule FY 2010 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2010 EM Quality Assurance Assessment Schedule FY 2010 Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the...

  13. Section 22: Quality Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Assurance (40 CFR § 194.22) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Quality Assurance (40 CFR § 194.22) Table of Contents 22.0 Quality Assurance (40 CFR § 194.22) 22.1 Requirements 22.2 Background 22.3 1998 Certification Decision 22.4 Changes in the CRA-2004 22.5 EPA's Evaluation of Compliance for the 2004 Recertification 22.5.1 NQA Standards 22.5.2 Audits of QA Plan

  14. Quality Assurance Specialist

    Broader source: Energy.gov [DOE]

    Alternate Title(s):Quality Control Technician; Quality Assurance Inspector; Quality Assurance Representative

  15. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-29

    To establish an effective management system [i.e., quality assurance programs (QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Cancels DOE O 414.1.

  16. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The Order defines roles and responsibilities for providing quality assurance for DOE products and services.Admin Chg 1, dated 5-8-13, supersedes DOE O 414.1D.

  17. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-07-21

    To provide Department of Energy (DOE) policy, set forth principles, and assign responsibilities for establishing, implementing, and maintaining programs of plans and actions to assure quality achievement in DOE programs. Cancels DOE O 5700.6, dated 1-16-1981. Canceled by DOE O 5700.6B, dated 9-23-1986.

  18. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-01-16

    To provide Department of Energy (DOE) policy, set forth principles, and assign responsibilities for establishing, implementing, and maintaining programs of plans and actions to assure quality achievement in DOE programs. Canceled by DOE O 5700.6A, dated 7-21-1981.

  19. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-04-29

    This Order ensures that the quality of DOE/NNSA products and services meets or exceeds the customer's expectations. This Order cancels DOE O 414.1A, Quality Assurance, dated 9-29-99, and Attachment 1, paragraph 8, and Attachment 2, paragraph 22, of DOE O 440.1A, Worker Protection Management for DOE Federal and Contractor Employees, dated 3-27-98. Cancels: DOE O 414.1A and DOE O 440.1A, parts as noted.

  20. Quality Assurance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Quality Assurance Requirements The QARD provides the framework for both the achievement and verification of quality. Quality Assurance Requirements and Description (1.37 MB) More Documents & Publications Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description QA Corporate Board Meeting - December 2013 Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

  1. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-07-12

    To establish an effective management system [i.e., quality assurance programs(QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Change 1, dated 7/12/01, facilitates the Department's organizational transition necessitated by establishment of the NNSA. (Attachment 2 of this Order is canceled by DOE O 470.2B.) Cancels: DOE O 414.1

  2. SOPP-43, EM-23 Quality Assurance Oversight

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY: The Office of Environmental Management (EM) Quality Assurance program requirements and expectations are documented in the EM Quality Assurance Program (QAP), EM-QA-001, dated October 2008. The QAP is the EM management system to ensure that all EM organizations "do work correctly." The QAP meets the requirements of DOE O 414.1C, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." The QAP demonstrates how QA and the Integrated Safety

  3. Introduction of Break-Out Session at the International PV Module Quality Assurance Forum (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.; Wohlgemuth, J.; Yamamichi, M.; Sample, T.

    2011-07-01

    This presentation outlines review requirements for quality assurance (QA) rating systems, logical design of QA systems, and specific tasks for break-out session 1 of the 2011 International PV Module Quality Assurance Forum.

  4. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides information to assist U.S. Department of Energy (DOE) Federal Project Directors (FPD) and their Integrated Project Teams (IPT) in carrying out their Quality Assurance (QA)-related roles and responsibilities.

  5. Quality Assurance for Critical Decision Reviews RM

    Broader source: Energy.gov [DOE]

    The purpose of this Quality Assurance for Capital Project Critical Decision Review Module (QA RM) is to identify, integrate, and clarify the QA performance objectives, criteria, and guidance needed...

  6. Establishing the Office of Environmental Management Quality Assurance Corporate Board

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to introduce the Office of Environmental Management (EM) Quality Assurance (QA) Corporate Board which implements EM'S policy and guidance and promotes lessons...

  7. EM Quality Assurance Policy, Revision 0 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy, Revision 0 EM Quality Assurance Policy, Revision 0 Previous EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 0). This document has been superseded by Revision 1 of the policy, but is still in use at some EM sites. EM Quality Assurance Policy, Revision 0 (259.04 KB) More Documents & Publications Line Management Understanding of QA and Oversight EM Quality Assurance Program (EM-QA-001 Revision 0) QA Corporate Board Meeting - February 2010 (Teleconference)

  8. Quality Assurance Checklists for Energy.gov Websites

    Broader source: Energy.gov [DOE]

    Use these quality assurance (QA) checklists for websites and Web pages in energy.gov's Drupal content management system to ensure they meet mandatory requirements:

  9. Quality Assurance Checklists for Video, Animations, and Audio Web Requirements

    Broader source: Energy.gov [DOE]

    Use these quality assurance (QA) checklists to ensure your audio files, flash animations, podcasts, and videos meet all Office of Energy Efficiency and Renewable Energy (EERE) standards.

  10. Quality Assurance Functional Area Qualification Standard

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-12-02

    The Quality Assurance (QA) Functional Area Qualification Standard (FAQS) establishes common functional area competency requirements for all DOE QA personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities that could impact the safe operation of DOE’s defense nuclear facilities.

  11. Microsoft Word - CBFO Names Randy Unger Director of Quality Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO Names Randy Unger Director of Quality Assurance CARLSBAD, N.M., June 14, 2011 -Randy Unger has been named Director of Quality Assurance (QA) for the U.S. Department of...

  12. Waste Management Quality Assurance Plan

    SciTech Connect (OSTI)

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  13. SU-F-BRE-16: VMAT Commissioning and Quality Assurance (QA) of An Elekta Synergy-STM Linac Using ICOM Test HarnessTM

    SciTech Connect (OSTI)

    Nguyen, A; Rajaguru, P; He, R; Yang, C; Kaurin, D; Paul, T; Plowman, A

    2014-06-15

    Purpose: To establish a set of tests based on the iCOM software that can be used to commission and perform periodic QA of VMAT delivery on the Elekta Synergy-S, commonly known as the Beam Modulator (BM). Methods: iCOM is used to create and deliver customized treatment fields to characterize the system in terms of 1) MLC positioning accuracy under static and dynamic delivery with full gantry rotation, 2) MLC positioning with known errors, 3) Maximum dose rate, 4) Maximum MLC speed, 5) Maximum gantry speed, 6) Synchronization: gantry speed versus dose rate, and 7) Synchronization: MLC speed versus dose rate. The resulting images were captured on the iView GT and exported in DICOM format to Dosimetry Check system for visual and quantitative analysis. For the initial commissioning phase, the system tests described should be supplemented with extensive patient QAs covering all clinically relevant treatment sites. Results: The system performance test suite showed that on our Synergy-S, MLC positioning was accurate under both static and dynamic deliveries. Intentional errors of 1 mm were also easily identified on both static and dynamic picket fence tests. Maximum dose rate was verified with stop watch to be consistently between 475-480 MU/min. Maximum gantry speed and MLC speed were 5.5 degree/s and 2.5 cm/s respectively. After accounting for beam flatness, both synchronization tests, gantry versus dose rate and MLC speed versus dose rate, were successful as the fields were uniform across the strips and there were no obvious cold/hot spots. Conclusion: VMAT commissioning and quality assurance should include machine characterization tests in addition to patient QAs. Elekta iCOM is a valuable tool for the design of customized VMAT field with specific MU, MLC leaf positions, dose rate, and indirect control of MLC and gantry speed at each of its control points.

  14. Track 9: Quality Assurance

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 9: Quality Assurance

  15. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Order ensures that the quality of DOE/NNSA products and services meets or exceeds the customers' expectations. Cancels DOE O 414.1B and DOE N 411.1. Canceled by DOE O 414.1D.

  16. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  17. Nuclear Safety Software & Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety Software & Quality Assurance Nuclear Safety Software & Quality Assurance Nuclear Safety Software & Quality Assurance In support of DOE O 410.1, Central Technical Authority Responsibilities Regarding Nuclear Safety Requirements, the Chief of Nuclear Safety (CNS) provides operational awareness, oversight, and assistance to Environmental Management (EM) Headquarters, field offices, and their contractors in the areas of nuclear safety Quality Assurance (QA) and Software Quality

  18. 2010 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Improvement Project Plan 2010 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2010 Quality Assurance Improvement Project

  19. 2012 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2012 Quality Assurance Improvement

  20. 2014 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Quality Assurance Improvement Project Plan 2014 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2014 Quality Assurance Improvement

  1. 2015 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Quality Assurance Improvement Project Plan 2015 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2015 Quality Assurance Improvement

  2. Quality Assurance Checklists for Energy.gov Web Requirements

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, use these quality assurance (QA) checklists for websites and Web pages in Energy.gov's content management system (CMS) to ensure they meet mandatory requirements:

  3. Quality Assurance | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Assurance The Quality Assurance & Continuous Improvement Department has the critical role of working with the U.S. Department of Energy and other regulators on the environment, health and safety; self-assessment and quality assurance. The department's goal is to devise, integrate and manage activities, programs and systems that make it possible for the lab, its employees and its contractors deliver services and products that perpetuate environmental, integrated safety and quality

  4. 222-S Laboratory Quality Assurance Plan. Revision 1

    SciTech Connect (OSTI)

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.

  5. RAVEN Quality Assurance Activities

    SciTech Connect (OSTI)

    Cogliati, Joshua Joseph

    2015-09-01

    This report discusses the quality assurance activities needed to raise the Quality Level of Risk Analysis in a Virtual Environment (RAVEN) from Quality Level 3 to Quality Level 2. This report also describes the general RAVEN quality assurance activities. For improving the quality, reviews of code changes have been instituted, more parts of testing have been automated, and improved packaging has been created. For upgrading the quality level, requirements have been created and the workflow has been improved.

  6. Quality Assurance Rule

    Broader source: Energy.gov [DOE]

    This rule establishes quality assurance requirements for contractors conducting activities, including providing items or services which affect, or may affect, nuclear safety of DOE nuclear facilities.

  7. EM QA Working Group September 2011 Meeting Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area and QA Resources Focus Area of the EM QA Corporate ... Practices Working Group and Quality Assurance ... of AL6XN Piping * Analysis: - The following causes ...

  8. IT Quality Assurance

    Broader source: Energy.gov [DOE]

    Quality, error-free work holds down costs. Avoiding mistakes and rework saves valuable time, effort, and materials. Quality assurance provides the mechanisms for paying close attention to details...

  9. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect (OSTI)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  10. SOPP-43, EM-23 Quality Assurance Oversight | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Program Management » Quality Assurance » SOPP-43, EM-23 Quality Assurance Oversight SOPP-43, EM-23 Quality Assurance Oversight Procedure to describe the process that will be utilized by the EM Office of Standards and Quality Assurance to guide its activities related to oversight and audit of the EM Field/site, project, and vendor QA programs. SOPP-43, EM-23 Quality Assurance Oversight (408.14 KB) More Documents & Publications Protocol for EM Review/Field Self-Assessment of

  11. FUEL CYCLE TECHNOLOGIES QUALITY ASSURANCE PROGRAM DOCUMENT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy FUEL CYCLE TECHNOLOGIES QUALITY ASSURANCE PROGRAM DOCUMENT FUEL CYCLE TECHNOLOGIES QUALITY ASSURANCE PROGRAM DOCUMENT The purpose of this Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is to define qualityassurance (QA) requirements for the FCT Program. These requirements are applicable to FCT activities and Participants (see definition) to the extent defined herein. In developing these requirements, it is recognized that each Department of Energy (DOE)

  12. Quality Assurance Source Requirements Traceability Database

    SciTech Connect (OSTI)

    MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

    2006-01-30

    At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

  13. Quality Assurance Corporate Board

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management (EM) Quality Assurance Corporate Board is an executive board that includes both senior U.S. Department of Energy (DOE) and contractor representatives who are...

  14. Software Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-02

    DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01. To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). Does not cancel other directives.

  15. Software Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-02

    To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01.

  16. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Admin Chg 2, dated 5-8-13, Admin Chg 1.

  17. SAPHIRE 8 Volume 6 - Quality Assurance

    SciTech Connect (OSTI)

    C. L. Smith; R. Nims; K. J. Kvarfordt

    2011-03-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE 8 is funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 8, what constitutes its parts, and limitations of those processes. In addition, this document describes the Independent Verification and Validation that was conducted for Version 8 as part of an overall QA process.

  18. An operational health physics quality assurance program

    SciTech Connect (OSTI)

    Costigan, S.A.; McAtee, J.L. III; Somers, W.M.; Huchton, R.L.

    1996-06-01

    DOE Order 5700.6C, Quality Assurance, stipulates QA requirements for all DOE activities. This order is now codified as 10CFR830.120, Nuclear Safety Management, Quality Assurance Requirements, which is applicable to DOE nuclear facilities. A Quality Assurance Management Plan (QAMP) was developed by the Health Physics Operations Group (ESH-1) at Los Alamos National Laboratory (LANL). The goal of the ESH-1 QAMP is to ensure that operational radiation protection activities meet the criteria outlined in DOE Order 5700.6C, DOE-ER-STD-6001-92 and 10CFR830.120. The ten required elements are QA Program, Personal Training and Qualifications, Quality Improvement, Documents and Records, Work Processes, Design, Procurement, Inspection and Acceptance Testing, Management Assessment and Independent Assessment. The QAMP has been useful for the development of QAMPs at nuclear facilities and has helped ensure uniformity of institutional requirements where Health Physics services are deployed to facilities. To implement a subset of QAMP requirements, a Quality Assurance Self-Evaluation Program (QASE) was established. This program provides a novel self-audit mechanism for the formal identification and correction of non-conforming items related to Operational Health Physics. Additionally, the QASE is a useful management tool for Radiological Control Technician Supervisors and staff and provides a tracking mechanism for ongoing problem areas. Data have been Collected for two calendar years on a number of concerns that fall into four general categories: radiological posting and labeling, instrumentation, monitoring requirements, and radiological documents/records.

  19. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    SciTech Connect (OSTI)

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  20. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  1. Quality assurance and data management

    SciTech Connect (OSTI)

    Lockrem, L.L.

    1998-01-12

    This report contains graphs and tables relating to quality assurance and data management for environmental quality at Hanford Reservation.

  2. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

  3. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    The directive provides guidance for DOE elements and contractors in developing and implementing an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Superseded by Admin Chg 1, 9-27-11.

  4. Quality assurance in the transport of UF{sub 6}

    SciTech Connect (OSTI)

    Ravenscroft, N.L.

    1991-12-31

    Edlow International`s primary business is the international transportation of radioactive materials. Therefore, Edlow has the responsibility to ensure that shipments are performed in compliance with regulatory requirements. In this regard, Edlow maintains a Quality Assurance (QA) Program. A major part of this Program is the establishment and use of QA Procedures. This paper addresses QA procedural requirements and how they are applied to a routine international shipment of low enriched UF{sub 6}. Only the major requirements for scheduling shipments will be addressed.

  5. Quality Assurance for Critical Decision Reviews RM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance for Critical Decision Reviews Module March 2010 CD-0 O 0 OFFICE OF Q C CD-1 F ENVIRO Standard R Quality A Rev Critical Decis CD-2 M ONMENTAL Review Plan Assuranc view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) e (QA) e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the

  6. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    SciTech Connect (OSTI)

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs.

  7. Automating linear accelerator quality assurance

    SciTech Connect (OSTI)

    Eckhause, Tobias; Thorwarth, Ryan; Moran, Jean M.; Al-Hallaq, Hania; Farrey, Karl; Ritter, Timothy; DeMarco, John; Pawlicki, Todd; Kim, Gwe-Ya; Popple, Richard; Sharma, Vijeshwar; Park, SungYong; Perez, Mario; Booth, Jeremy T.

    2015-10-15

    Purpose: The purpose of this study was 2-fold. One purpose was to develop an automated, streamlined quality assurance (QA) program for use by multiple centers. The second purpose was to evaluate machine performance over time for multiple centers using linear accelerator (Linac) log files and electronic portal images. The authors sought to evaluate variations in Linac performance to establish as a reference for other centers. Methods: The authors developed analytical software tools for a QA program using both log files and electronic portal imaging device (EPID) measurements. The first tool is a general analysis tool which can read and visually represent data in the log file. This tool, which can be used to automatically analyze patient treatment or QA log files, examines the files for Linac deviations which exceed thresholds. The second set of tools consists of a test suite of QA fields, a standard phantom, and software to collect information from the log files on deviations from the expected values. The test suite was designed to focus on the mechanical tests of the Linac to include jaw, MLC, and collimator positions during static, IMRT, and volumetric modulated arc therapy delivery. A consortium of eight institutions delivered the test suite at monthly or weekly intervals on each Linac using a standard phantom. The behavior of various components was analyzed for eight TrueBeam Linacs. Results: For the EPID and trajectory log file analysis, all observed deviations which exceeded established thresholds for Linac behavior resulted in a beam hold off. In the absence of an interlock-triggering event, the maximum observed log file deviations between the expected and actual component positions (such as MLC leaves) varied from less than 1% to 26% of published tolerance thresholds. The maximum and standard deviations of the variations due to gantry sag, collimator angle, jaw position, and MLC positions are presented. Gantry sag among Linacs was 0.336 ± 0.072 mm. The

  8. SAPHIRE 8 Software Quality Assurance Plan

    SciTech Connect (OSTI)

    Curtis Smith

    2010-02-01

    This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

  9. EM Quaility Assurance Program (EM-QA-001 Revision 1)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM-QA-001 Rev. 1 Issue Date 06/11/12 2 Project lifecycles including design, engineering, construction, commissioning, operation, and post-operation, e.g., surveillance and maintenance, deactivation, decommissioning, and environmental restoration. 3.0 APPLICABILITY The requirements contained within this document apply to EM HQ, EM Field/Project Offices, and EM contractors (including flow down to subcontractors, vendors, and suppliers) as applicable to the work being performed by each entity. Each

  10. Quality Assurance Policy and Directives | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Policy and Directives Quality Assurance Policy and Directives DOE's QA requirements are found in a regulation for nuclear facilities/activities 10 CFR 830, Subpart A and DOE O 414.1D, Quality Assurance, for all other applications. Guidance for implementing the requirements is found in: DOE G 414.1-1C, G 414.1-2B, G 414.1-4. The Office also represents DOE's interests on international and national quality standards committees and conformity assessment bodies (third-party

  11. Report: EM Quality Assurance

    Office of Environmental Management (EM)

    and has held two meeting. In addition to an exchange of information and updates, its main focus has been on the major issues facing EM QA and its contractors. From a list of 20...

  12. Microsoft Word - CBFO Names Randy Unger Director of Quality Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO Names Randy Unger Director of Quality Assurance CARLSBAD, N.M., June 14, 2011 -Randy Unger has been named Director of Quality Assurance (QA) for the U.S. Department of Energy's (DOE's)Carlsbad Field Office (CBFO), which oversees the Waste Isolation Pilot Plant (WIPP). Unger brings with him 17 years of experience within the DOE complex from sites across the country. "I'm pleased to announce the selection of Randy Unger as the CBFO Director of Quality Assurance," said Acting CBFO

  13. The Groundwater Performance Assessment Project Quality Assurance Plan

    SciTech Connect (OSTI)

    Luttrell, Stuart P.

    2006-05-11

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  14. International Quality Assurance Standards (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.; Hacke, P.; Wohlgemuth, J.; Kempe, M.; Yamamichi, M.

    2011-02-01

    Tests to make quantitative predictions about photovoltaic (PV) modules are needed. This presentation proposes the creation of international quality assurance standards for PV modules.

  15. Weapons Quality Assurance Qualification Standard

    Energy Savers [EERE]

    ... Emphasis preferred on quality assurance, statistics, DOE-STD-1025-2008 7 mathematics, production management, industrial management, computer science, engineering, engineering ...

  16. National Ignition Facility quality assurance plan for laser materials and optical technology

    SciTech Connect (OSTI)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials & Optical Technology (LM&OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM&OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies.

  17. Waste management R&D Quality Assurance: An alternative approach

    SciTech Connect (OSTI)

    Brosseau, D.A.; Harlan, C.P.; Cochrell, R.C.

    1991-02-01

    This paper summarizes the development and initial implementation of a Quality Assurance (QA) Program for technical activities associated with assessing compliance of an existing DOE nuclear waste site with applicable environmental regulations. The requirements for establishing the QA program are defined, along with the approach and emphasis used to develop the program. The structure of the program and the various levels of QA plans and procedures are briefly discussed. Initial implementation efforts are summarized. The QA program was developed by and for the project participants and was structured according to the major technical requirements of the project. The QA plans and procedures are written for the convenience and use of the technical staff and not merely to satisfy auditor expectations. Every effort was made to avoid an 18-point approach typical of many QA programs patterned after the dictates of the industry recognized ``national consensus standards.`` Flexibility is emphasized due to the nature of the research and development activities associated with the technical program. Recommendations are provided for using this alternative approach to QA program development for similar technical efforts elsewhere. 10 refs., 1 fig., 5 tabs.

  18. Order Module--DOE O 414.1D, QUALITY ASSURANCE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14.1D, QUALITY ASSURANCE Order Module--DOE O 414.1D, QUALITY ASSURANCE "To ensure that DOE, including NNSA, products and services meet or exceed customers' requirements and expectations. To achieve quality for all work based upon the following principles: All work, as defined in this Order, is conducted through an integrated and effective management system. Management support for planning, organization, resources, direction, and control is essential to quality assurance (QA). Performance

  19. Quality Assurance for Residential Retrofit Programs

    Broader source: Energy.gov [DOE]

    This webinar covered quality assurance and how to assure that your investment achieves a desired result of saving energy.

  20. 2011 SAPHIRE 8 Software Quality Assurance Status Report

    SciTech Connect (OSTI)

    Kurt G. Vedros

    2011-09-01

    The Software Quality Assurance engineer position was created in fiscal year 2011 to better maintain and improve the quality of the SAPHIRE 8 development program. This year's Software Quality Assurance tasks concentrated on developing the framework of the SQA program. This report reviews the accomplishments and recommendations for each of the subtasks set forth for JCN V6059: (1) Reviews, Tests, and Code Walkthroughs; (2) Data Dictionary; (3) Metrics; (4) Requirements Traceability Matrix; (5) Provide Oversight on SAPHIRE QA Activities; and (6) Support NRC Presentations and Meetings.

  1. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  2. QA Corporate Board Meeting - February 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 QA Corporate Board Meeting - February 2014 14th EM Quality Assurance Corporate Board Meeting Meeting Location: Teleconference Room: N/A Documents Available for Download Meeting Minutes (169.87 KB) More Documents & Publications QA Corporate Board Meeting - December 2013 QA Corporate Board Meeting - May 2012 QA Corporate Board Meeting - September 2010

  3. QA Corporate Board Meeting - October 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 QA Corporate Board Meeting - October 2015 16th EM Quality Assurance Corporate Board Meeting Meeting Date: October 26, 2015 Meeting Location: VTC Documents Available for Download Meeting Minutes (462.84 KB) More Documents & Publications QA Corporate Board Meeting - November 2012 QA Corporate Board Meeting - May 2012 QA Corporate Board Meeting - October 2014

  4. Waste Encapsulation and Storage Facility (WESF) Quality Assurance Program Plan (QAPP)

    SciTech Connect (OSTI)

    ROBINSON, P.A.

    2000-04-17

    This Quality Assurance Plan describes how the Waste Encapsulation and Storage Facility (WESF) implements the quality assurance (QA) requirements of the Quality Assurance Program Description (QAPD) (HNF-Mp-599) for Project Hanford activities and products. This QAPP also describes the organizational structure necessary to successfully implement the program. The QAPP provides a road map of applicable Project Hanford Management System Procedures, and facility specific procedures, that may be utilized by WESF to implement the requirements of the QAPD.

  5. Better Buildings Workforce Peer Exchange Quality Assurance Strategies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Strategies Better Buildings Workforce Peer Exchange Quality Assurance Strategies Better Buildings Workforce Peer Exchange Quality Assurance Strategies, call ...

  6. QA Checklist for Partnership Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    QA Checklist for Partnership Sites This is the Quality Assurance (QA) Checklist for all EERE Web sites that are not in the standard EERE Web template. Section 508 Requirements All ...

  7. Mixed Waste Integrated Program Quality Assurance requirements plan

    SciTech Connect (OSTI)

    Not Available

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  8. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect (OSTI)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  9. Used Fuel Disposition Campaign Preliminary Quality Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to ...

  10. EM Quality Assurance Policy, Revision 0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It is EM policy that all EM projects will have a consistent quality assurance approach while allowing for grading based ... Quality Assurance Implementation Plan demonstrating how ...

  11. Quality Assurance Program Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CURRENT DOE G 414.1-2B Admin Chg 2, Quality Assurance Program Guide by Colette Broussard Functional areas: Administrative Change, Quality Assurance and Oversight This Guide...

  12. WIPP Documents - Quality Assurance and Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Assurance and Safety Quality Assurance Program Document DOE/CBFO-94-1012 Rev. 12 Effective date: 8/15

  13. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  14. Redesigning Radiotherapy Quality Assurance: Opportunities to Develop an Efficient, Evidence-Based System to Support Clinical Trials-Report of the National Cancer Institute Work Group on Radiotherapy Quality Assurance

    SciTech Connect (OSTI)

    Bekelman, Justin E.; Deye, James A.; Vikram, Bhadrasain; Bentzen, Soren M.; Bruner, Deborah; Curran, Walter J.; Dignam, James; Efstathiou, Jason A.; FitzGerald, T.J.; Hurkmans, Coen; Ibbott, Geoffrey S.; Lee, J. Jack; Merchant, Thomas E.; Michalski, Jeff; Palta, Jatinder R.; Simon, Richard; Ten Haken, Randal K.; Timmerman, Robert; Tunis, Sean; Coleman, C. Norman; and others

    2012-07-01

    Purpose: In the context of national calls for reorganizing cancer clinical trials, the National Cancer Institute sponsored a 2-day workshop to examine challenges and opportunities for optimizing radiotherapy quality assurance (QA) in clinical trial design. Methods and Materials: Participants reviewed the current processes of clinical trial QA and noted the QA challenges presented by advanced technologies. The lessons learned from the radiotherapy QA programs of recent trials were discussed in detail. Four potential opportunities for optimizing radiotherapy QA were explored, including the use of normal tissue toxicity and tumor control metrics, biomarkers of radiation toxicity, new radiotherapy modalities such as proton beam therapy, and the international harmonization of clinical trial QA. Results: Four recommendations were made: (1) to develop a tiered (and more efficient) system for radiotherapy QA and tailor the intensity of QA to the clinical trial objectives (tiers include general credentialing, trial-specific credentialing, and individual case review); (2) to establish a case QA repository; (3) to develop an evidence base for clinical trial QA and introduce innovative prospective trial designs to evaluate radiotherapy QA in clinical trials; and (4) to explore the feasibility of consolidating clinical trial QA in the United States. Conclusion: Radiotherapy QA can affect clinical trial accrual, cost, outcomes, and generalizability. To achieve maximum benefit, QA programs must become more efficient and evidence-based.

  15. Keys to Successful Quality Assurance and Quality Control Programs...

    Office of Environmental Management (EM)

    Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) January 28...

  16. Keys to Successful Quality Assurance and Quality Control Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) Better Buildings Residential Network ...

  17. QA Corporate Board Meeting - December 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2013 QA Corporate Board Meeting - December 2013 13th EM Quality Assurance Corporate Board Meeting Meeting Location: Las Vegas, NV - Nevada Field Office Room: Building C-1, Room 6339 Agenda for December 02, 2013 Documents Available for Download Meeting and Presentation Materials (10.02 MB) Meeting Minutes (129.36 KB) More Documents & Publications QA Corporate Board Meeting - October 2014 QA Corporate Board Meeting - November 2012 EM Quality Assurance Program (EM-QA-001 Revisi

  18. Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1

    SciTech Connect (OSTI)

    Carpenter, C.A.

    1995-03-02

    This Quality Assurance Program Plan (QAPP) is organized to address WHC`s implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE.

  19. CBFO_QA_Director_News_Release

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Assurance Director CARLSBAD, N.M., December 18, 2013 - The U.S. Department of Energy's (DOE) Carlsbad Field Office (CBFO) has announced the selection of Mike Brown as the Director of the Office of Quality Assurance (QA). Brown's responsibilities include programmatic responsibility and lead for managing the Office of QA Program for the Waste Isolation Pilot Plant (WIPP) and National Transuranic (TRU) Program. CBFO has responsibility for WIPP and the National TRU Program. "The QA

  20. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  1. Training Workshop: DOE QA Framework, Application to DOE Nuclear...

    Office of Environmental Management (EM)

    THURSDAY, May 14, 2015 One-Day WorkshopTraining "Understanding DOE Quality Assurance ... 2 Objectives One-day QA orientation training and awareness workshop. Focus is on ...

  2. The effect of job performance aids on quality assurance

    SciTech Connect (OSTI)

    Fosshage, Erik

    2014-06-01

    Job performance aids (JPAs) have been studied for many decades in a variety of disciplines and for many different types of tasks, yet this is the first known research experiment using JPAs in a quality assurance (QA) context. The objective of this thesis was to assess whether a JPA has an effect on the performance of a QA observer performing the concurrent dual verification technique for a basic assembly task. The JPA used in this study was a simple checklist, and the design borrows heavily from prior research on task analysis and other human factors principles. The assembly task and QA construct of concurrent dual verification are consistent with those of a high consequence manufacturing environment. Results showed that the JPA had only a limited effect on QA performance in the context of this experiment. However, there were three important and unexpected findings that may draw interest from a variety of practitioners. First, a novel testing methodology sensitive enough to measure the effects of a JPA on performance was created. Second, the discovery that there are different probabilities of detection for different types of error in a QA context may be the most far-reaching results. Third, these results highlight the limitations of concurrent dual verification as a control against defects. It is hoped that both the methodology and results of this study are an effective baseline from which to launch future research activities.

  3. Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1993-06-01

    The Quality Assurance Project Plan (QAPP) is intended to document the quality assurance of the Environmental Monitoring Program. The Quality Assurance Project Plan has two parts and is written to become a chapter in the Environmental Monitoring Plan. Part A describes the management responsibilities and activities performed to assure the quality of the Environmental Monitoring Program. Part B covers the documentation requirements for changes in the Monitoring Program, and provides details on control of the design and implementation of quality assurance activities.

  4. Safety & Quality Assurance

    Broader source: Energy.gov [DOE]

    Together, our Facility Operations Division and Engineering, Safety and Quality Division work to ensure EM conducts its operations and cleanup safely through sound practices. These divisions ensure...

  5. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    SciTech Connect (OSTI)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  6. ROC analysis in patient specific quality assurance

    SciTech Connect (OSTI)

    Carlone, Marco; MacPherson, Miller; Cruje, Charmainne; Rangel, Alejandra; McCabe, Ryan; Nielsen, Michelle

    2013-04-15

    Purpose: This work investigates the use of receiver operating characteristic (ROC) methods in patient specific IMRT quality assurance (QA) in order to determine unbiased methods to set threshold criteria for {gamma}-distance to agreement measurements. Methods: A group of 17 prostate plans was delivered as planned while a second group of 17 prostate plans was modified with the introduction of random multileaf collimator (MLC) position errors that are normally distributed with {sigma}{approx}{+-}0.5, {+-}1.0, {+-}2.0, and {+-}3.0 mm (a total of 68 modified plans were created). All plans were evaluated using five different {gamma}-criteria. ROC methodology was applied by quantifying the fraction of modified plans reported as 'fail' and unmodified plans reported as 'pass.'Results: {gamma}-based criteria were able to attain nearly 100% sensitivity/specificity in the detection of large random errors ({sigma} > 3 mm). Sensitivity and specificity decrease rapidly for all {gamma}-criteria as the size of error to be detected decreases below 2 mm. Predictive power is null with all criteria used in the detection of small MLC errors ({sigma} < 0.5 mm). Optimal threshold values were established by determining which criteria maximized sensitivity and specificity. For 3%/3 mm {gamma}-criteria, optimal threshold values range from 92% to 99%, whereas for 2%/2 mm, the range was from 77% to 94%. Conclusions: The optimal threshold values that were determined represent a maximized test sensitivity and specificity and are not subject to any user bias. When applied to the datasets that we studied, our results suggest the use of patient specific QA as a safety tool that can effectively prevent large errors (e.g., {sigma} > 3 mm) as opposed to a tool to improve the quality of IMRT delivery.

  7. DOE Order on Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order,

  8. S-PRIME Thermionic Space Nuclear Power System Quality Assurance Program Plan

    SciTech Connect (OSTI)

    Jones, C.M.

    1992-09-23

    This Quality Assurance Program Plan (QAPP)describes how the Thermionic Space Nuclear Power System Design and Technology Demonstration Project addresses the Quality Assurance requirements delineated in DOE Order 5700.6C and the Thermionic Program Management Plan 214PMP000001. The Quality Assurance Program is based on the following fundamental principles, which Rocketdyne endorses and the QA Project Manager and Program Manager shall enforce: Quality Achievement is a continuing responsibility of line organization at all levels; the Quality Assurance organization through the effective overview of work, gives additional assurance that specified requirements are met; risk is the fundamental consideration in determining to what extent the Quality Assurance Plan should be applied to items and processes; action is based on facts and analysis, customer driven quality, strong quality leadership and continuous improvement.

  9. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  10. Quality assurance and quality control for the compact physics research facility (CPRF) and ZTH experiment

    SciTech Connect (OSTI)

    Kewish, R.W. Jr.

    1989-01-01

    In compliance with DOE Order 5700.6B, which establishes policies to assure quality achievement in DOE programs, we instituted a quality assurance and quality control program whose primary goal is to assure that reliable components are available with which to assemble the CPRF/ZTH experiment. The Code of Federal Regulations 10 CFR 50, appendix B, and the ANSI standard N45.2 were used as a primary source of guidance in establishing a plan for our QA program. Accepted codes, such as the National Electric Code (NEC), and standards adopted by organizations such as ANSI, IEEE, ASME, and NEMA were used in the design and production of components in keeping with the primary goal of the CPRF program. In setting up the CPRF/ZTH quality assurance program it was our intention to have these standards apply to all suppliers, both within and outside the Laboratory. 5 refs., 6 figs.

  11. Quality Assurance Specialist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Specialist Quality Assurance Specialist Submitted by admin on Sun, 2016-06-26 00:15 Job Summary Organization Name Department Of Energy Agency SubElement ...

  12. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

  13. Quality Assurance Corporate Board | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Any questions concerning the EM Quality Assurance Corporate Board can be directed to Bob Murray, Director for the Office of Standards and Quality Assurance, at 202-586-1426. ...

  14. Safety Software Quality Assurance- Central Registry

    Broader source: Energy.gov [DOE]

    The Department of Energy maintains a list of "toolbox" codes that have been evaluated against DOE Safety Software Quality Assurance (SSQA) requirements of DOE O 414.1D, Quality Assurance, and its...

  15. Quality assurance grading guidelines for research and development at DOE facilities

    SciTech Connect (OSTI)

    Powell, T.B.; Morris, R.N.

    1993-01-01

    The quality assurance (QA) requirements for the US Department of Energy (DOE) are established in DOE Order 5700.6C. This order is applicable for all DOE departmental elements, management, and maintenance and operating contractors and requires that documented Quality Assurance Programs (QAPs) are prepared at all levels; it has one attachment. The DOE Office of Energy Research (DOE-ER) has issued a standard to ensure implementation of the full intent of this order in the ER community.

  16. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Quality Assurance EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 EM Quality Assurance Centralized Training Platform Project...

  17. Quality assurance program plan for SNF characterization support project

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  18. Quality assurance program plan for Building 327

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 327. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements. This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP 113 1, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996.

  19. QA Corporate Board Meeting - March 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 QA Corporate Board Meeting - March 2008 1st EM Quality Assurance Corporate Board Meeting Meeting Location: 9950 Covington Cross Drive, Las Vegas, Nevada 89144 Building/Room: BSC Office Building/Conference Rm. 915 Agenda for March 13, 2008 Documents Available for Download Meeting and Presentation Materials (614.25 KB) Meeting Minutes (30.07 KB) More Documents & Publications 2012 Quality Assurance Improvement Project Plan QA Corporate Board Meeting - July 2008 QA Corporate Board Meeting -

  20. QA Corporate Board Meeting - May 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2012 QA Corporate Board Meeting - May 2012 11th EM Quality Assurance Corporate Board Meeting Meeting Location: Las Vegas, NV- DOE Office at Lossee Road With Limited Conference Call Capabilities Room: 6404 Agenda for May 1, 2012 Documents Available for Download Meeting and Presentation Materials (3.78 MB) Meeting Minutes (160.07 KB) More Documents & Publications QA Corporate Board Meeting - November 2012 QA Corporate Board Meeting - February 2011 2012 Quality Assurance Improvement Project

  1. Graded quality assurance in procurement

    SciTech Connect (OSTI)

    Fan, D.C.

    1995-12-31

    The Code of Federal Regulations, Part 50, Appendix B, requires every applicant for an operating license to include in its final safety analysis report information pertaining to the managerial and administrative controls to be used to ensure safe operation. This appendix establishes quality assurance requirements for the design, construction, and operation of those structures, systems, and components (SSC) that perform safety-related functions. The activities affecting safety-related SSC functions include designing, purchasing, fabricating, and so forth, Title 10 CFR 50.65 established requirements to ensure that the maintenance activities conducted by licensees are effective. This is also known as the maintenance rule.

  2. QUALITY ASSURANCE EXCHANGE July 2005 Volume 1 Issue 1

    Broader source: Energy.gov [DOE]

    QUALITY ASSURANCE EXCHANGE July 2005 Volume 1 Issue 1 US Department of Energy, Office of Quality Assurance Programs (EH-31)

  3. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  4. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.

  5. QA Corporate Board Meeting - June 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 2010 QA Corporate Board Meeting - June 2010 7th EM Quality Assurance Corporate Board Meeting Meeting Location: Marriott Chicago O'Hare, 8535 West Higgins Road, Chicago, IL 60631 Room: TBD Draft Agenda for June 9, 2010 Documents Available for Download Meeting and Presentation Materials (6.16 MB) Meeting Minutes (173.99 KB) More Documents & Publications 2010 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan QA Corporate Board Meeting - September

  6. QA Corporate Board Meeting - November 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12 QA Corporate Board Meeting - November 2012 12th EM Quality Assurance Corporate Board Meeting Meeting Location: Richland, WA - Office of River Protection Room: 2440 Stevens Center - Room 2311 Agenda for November 27, 2012 Documents Available for Download Meeting and Presentation Materials (729.23 KB) Meeting Minutes (122.3 KB) More Documents & Publications QA Corporate Board Meeting - May 2012 QA Corporate Board Meeting - February 2011 QA Corporate Board Meeting - December 2013

  7. Waste Receipt Quality Assurance Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receipt Quality Assurance Program About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual Waste Forecast and Funding Arrangements Waste Stream Approval Waste Shipment Approval Waste Receipt Quality Assurance Program Waste Specification Records Tools Points of Contact Waste Receipt Quality Assurance Program Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Site has a

  8. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  9. Quality assurance program plan fuel supply shutdown

    SciTech Connect (OSTI)

    Metcalf, I.L.

    1998-09-21

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP.

  10. Waste Receipt Quality Assurance Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receipt Quality Assurance Program About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual...

  11. Quality Assurance Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Each employee is expected to do the job in accordance with procedures and other ... Communication and Outreach Stakeholder Satisfaction Survey CERCLA Sites Quality Assurance ...

  12. FAQS Reference Guide – Weapon Quality Assurance

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the August 2008 edition of DOE-STD-1025-2008, Weapon Quality Assurance Functional Area Qualification Standard.

  13. Safety Software Quality Assurance Functional Area Qualification...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    72-2011, Safety Software Quality Assurance Functional Area Qualification Standard by Diane Johnson This SSQA FAQS identifies the minimum technical competency requirements for DOE...

  14. Quality assurance program description: Hanford Waste Vitrification Plant, Part 1. Revision 3

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    This document describes the Department of Energy`s Richland Field Office (DOE-RL) quality assurance (QA) program for the processing of high-level waste as well as the Vitrification Project Quality Assurance Program for the design and construction of the Hanford Waste Vitrification Plant (HWVP). It also identifies and describes the planned activities that constitute the required quality assurance program for the HWVP. This program applies to the broad scope of quality-affecting activities associated with the overall HWVP Facility. Quality-affecting activities include designing, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, maintaining, repairing, and modifying. Also included are the development, qualification, and production of waste forms which may be safely used to dispose of high-level radioactive waste resulting from national defense activities. The HWVP QA program is made up of many constituent programs that are being implemented by the participating organizations. This Quality Assurance program description is intended to outline and define the scope and application of the major programs that make up the HWVP QA program. It provides a means by which the overall program can be managed and directed to achieve its objectives. Subsequent parts of this description will identify the program`s objectives, its scope, application, and structure.

  15. Keys to Successful Quality Assurance and Quality Control Programs (101) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) Better Buildings Residential Network Peer Exchange Call Series: Keys to Successful Quality Assurance and Quality Control Programs (101), call slides and discussion summary. Call Slides and Discussion Summary (1.79 MB) More Documents & Publications Quality Control, Standardization of Upgrades, and Workforce Expectations Home

  16. Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program

    SciTech Connect (OSTI)

    Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

    2008-03-07

    The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energys (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 Quality Assurance Program under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as not applicable to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented

  17. Quality assurance project plan for the radionuclide airborne emissions for the Plutonium Finishing Plant

    SciTech Connect (OSTI)

    Kristofzski, J.G.; Alison, D.

    1992-04-01

    The information provided in this document meets the quality assurance (QA) requirements for the National Emission Standards for Hazardous Air Pollutants'' (NESHAP) (EPA 1989a) radionuclide airborne emissions control program in accordance with the regulation's referenced stack monitoring method (i.e. Method 114) for the Plutonium Finishing Plant (PFP). At the Hanford Site, the operations personnel have primary responsibility for implementing the continuous radionuclide emission measurements in conformance with NESHAP. Continuous measurement is used to describe continuous sampling of the effluent stream withdrawn and subjected to radiochemical analysis, and monitoring of radionuclide particulate emissions for administrative control. This Quality Assurance Project Plan (QAPjP) fully describes these PFP- implemented activities and the associated QA program as required by the NESHAP. The information is provided in the format specified in QAMS/005, Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (EPA 1983a). This QAPjP describes the QA program for only those activities that are the responsibility of the PFP: operation, calibration, and maintenance of the sampling systems. The QA requirements for laboratory services, data compilation, and data reporting are beyond the scope of this QAPjP.

  18. Quality assurance project plan for the radionuclide airborne emissions for the Plutonium Finishing Plant

    SciTech Connect (OSTI)

    Kristofzski, J.G.; Alison, D.

    1992-04-01

    The information provided in this document meets the quality assurance (QA) requirements for the ``National Emission Standards for Hazardous Air Pollutants`` (NESHAP) (EPA 1989a) radionuclide airborne emissions control program in accordance with the regulation`s referenced stack monitoring method (i.e. Method 114) for the Plutonium Finishing Plant (PFP). At the Hanford Site, the operations personnel have primary responsibility for implementing the continuous radionuclide emission measurements in conformance with NESHAP. Continuous measurement is used to describe continuous sampling of the effluent stream withdrawn and subjected to radiochemical analysis, and monitoring of radionuclide particulate emissions for administrative control. This Quality Assurance Project Plan (QAPjP) fully describes these PFP- implemented activities and the associated QA program as required by the NESHAP. The information is provided in the format specified in QAMS/005, Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (EPA 1983a). This QAPjP describes the QA program for only those activities that are the responsibility of the PFP: operation, calibration, and maintenance of the sampling systems. The QA requirements for laboratory services, data compilation, and data reporting are beyond the scope of this QAPjP.

  19. Quality assurance manual: Volume 2, Appendices

    SciTech Connect (OSTI)

    Oijala, J.E.

    1988-06-01

    This paper contains quality assurance information on departments of the Stanford Linear Accelerator Center. Particular quality assurance policies and standards discussed are on: Mechanical Systems; Klystron and Microwave Department; Electronics Department; Plant Engineering; Accelerator Department; Purchasing; and Experimental Facilities Department. (LSP)

  20. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual

    SciTech Connect (OSTI)

    C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

  1. SWiFT Software Quality Assurance Plan.

    SciTech Connect (OSTI)

    Berg, Jonathan Charles

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  2. Quality Assurance Baseline Assessment Report to Los Alamos National Laboratory Analytical Chemistry Operations

    SciTech Connect (OSTI)

    Jordan, R. A.

    1998-09-01

    This report summarizes observations that were made during a Quality Assurance (QA) Baseline Assessment of the Nuclear Materials Technology Analytical Chemistry Group (NMT-1). The Quality and Planning personnel, for NMT-1, are spending a significant amount of time transitioning out of their roles of environmental oversight into production oversight. A team from the Idaho National Engineering and Environmental Laboratory Defense Program Environmental Surety Program performed an assessment of the current status of the QA Program. Several Los Alamos National Laboratory Analytical Chemistry procedures were reviewed, as well as Transuranic Waste Characterization Program (TWCP) QA documents. Checklists were developed and the assessment was performed according to an Implementation Work Plan, INEEL/EXT-98-00740.

  3. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

  4. Quality Assurance Grading Guidelines for Research and Development at DOE Facilities (DOE Order 5700.6C)

    SciTech Connect (OSTI)

    Powell, T.B.

    1992-01-01

    The quality assurance (QA) requirements for the U.S. Department of Energy (DOE) are established in DOE Order 5700.6C. This order is applicable for all DOE departmental elements, management, and maintenance and operating contractors and requires that documented Quality Assurance Programs (QAPs) are prepared at all levels; it has one attachment. The DOE Office of Energy Research (DOE-ER) has issued a standard to ensure implementation of the full intent of this order in the ER community.

  5. Assuring quality in high-consequence engineering

    SciTech Connect (OSTI)

    Hoover, Marcey L.; Kolb, Rachel R.

    2014-03-01

    In high-consequence engineering organizations, such as Sandia, quality assurance may be heavily dependent on staff competency. Competency-dependent quality assurance models are at risk when the environment changes, as it has with increasing attrition rates, budget and schedule cuts, and competing program priorities. Risks in Sandia's competency-dependent culture can be mitigated through changes to hiring, training, and customer engagement approaches to manage people, partners, and products. Sandia's technical quality engineering organization has been able to mitigate corporate-level risks by driving changes that benefit all departments, and in doing so has assured Sandia's commitment to excellence in high-consequence engineering and national service.

  6. SAPHIRE 8 Software Quality Assurance Oversight

    SciTech Connect (OSTI)

    Kurt G. Vedros

    2011-09-01

    The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, 'New Features and Capabilities Overview'.

  7. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Broader source: Energy.gov (indexed) [DOE]

    ... Identify the causes of problems, and include prevention of recurrence as a part of corrective action planning. An ... evaluations; and Emergency b g e m e n t ...

  8. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Newsom, H.C.

    1999-01-24

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted.

  9. Audit of the DOE's Commercial Laboratory Quality Assurance Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Quality Assurance Evaluation Requirement The Department's Quality Assurance Order, 5700.6C dated August 21, 1991, requires that contractors confirm that subcontract commercial ...

  10. Quality Assurance Exchange August 2009, Volume 5 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange August 2009, Volume 5 Issue 2 U.S. Department of Energy Office of Quality Assurance Policy and Assistance

  11. Quality Assurance Exchange June 2006, Volume 2 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange June 2006, Volume 2 Issue 2 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

  12. Automated Office Systems Support (AOSS) Quality Assurance Model...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A quality assurance model, including checklists, for activity relative to network and desktop computer support. Automated Office Systems Support (AOSS) Quality Assurance Model ...

  13. Nuclear Waste Partnership (NWP) Quality Assurance Program Description...

    Office of Environmental Management (EM)

    Waste Partnership (NWP) Quality Assurance Program Description (QAPD) Nuclear Waste Partnership (NWP) Quality Assurance Program Description (QAPD) The documents included in this ...

  14. Understanding DOE Quality Assurance Requirements and ASME NQA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Agenda Understanding DOE Quality Assurance Requirements and ASME NQA-1 For ...

  15. QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3

    Broader source: Energy.gov [DOE]

    QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

  16. Quality Assurance Exchange March 2006, Volume 2 Issue 1

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange March 2006, Volume 2 Issue 1 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

  17. Quality Assurance Exchange Winter 2010 Volume 6 Issue 1

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange Winter 2010 Volume 6 Issue 1 U.S. Department of Energy Office of Quality Assurance Policy and Assistance

  18. Quality Assurance Exchange October 2008 Volume 4 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange October 2008 Volume 4 Issue 2 U.S. Department of Energy Office of Quality Assurance Policy and Assistance

  19. FAQS Gap Analysis Qualification Card - Quality Assurance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance FAQS Gap Analysis Qualification Card - Quality Assurance Functional Area Qualification Standard Gap Analysis Qualification Cards outline the differences between ...

  20. Quality Assurance Checklists for Video, Animations, and Audio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Videos, Animations, & Audio Quality Assurance Checklists for Video, Animations, and Audio Web Requirements Quality Assurance Checklists for Video, Animations, and Audio Web ...

  1. Quality Assurance Checklists for Energy.gov Web Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy.gov Content Management System Quality Assurance Checklists for Energy.gov Web Requirements Quality Assurance Checklists for Energy.gov Web Requirements For Office of ...

  2. Quality Assurance Guide for Project Management - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Quality Assurance Guide for Project Management by John Makepeace Functional areas: Project Management, Quality Assurance and Oversight This Guide provides acceptable approaches...

  3. FAQS Reference Guide – Quality Assurance

    Broader source: Energy.gov [DOE]

    This reference guide has been developed to address the competency statements in the April 2002 edition of DOE-Standard (STD)-1150-2002, Quality Assurance Functional Area Qualification Standard.

  4. Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  5. [Quality assurance in basic research and R D

    SciTech Connect (OSTI)

    Hoke, P.B.

    1993-01-01

    Oak Ridge National Laboratory (ORNL) is one of the nation's largest and most widely diversified federal multipurpose research and development centers. The Laboratory is operated by Martin Marietta Energy Systems Inc. for the US DOE. Its mission embraces non-nuclear as well as nuclear energy development together with a wide range of supporting research in engineering, physical sciences, life sciences as well as social sciences and economics. The Laboratory's program is dominated by four major areas of development that are approximately equal in size: nuclear (fission) energy development, basic physical sciences research, biomedical and environmental, and magnetic fusion energy development. This document outlines ORNL's quality assurance (QA) program in response to the ten criteria of DOE order 5700.6C. Guidance for implementation comes both from Attachment I of 5700.6C and DOE-ER-STD-6001-92. The basis for the program, integration of DOE orders, program architecture, assessment activities, and financial restraints are discussed.

  6. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect (OSTI)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  7. UMTRA Project Office Quality Assurance Program Plan. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

  8. DOE Order on Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance » DOE Order on Quality Assurance DOE Order on Quality Assurance The purpose of this order is to ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. DOE Order on Quality Assurance (252.09 KB) More Documents & Publications Order Module--DOE O 414.1D, QUALITY ASSURANCE Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY

  9. The Groundwater Performance Assessment Project Quality Assurance Plan

    SciTech Connect (OSTI)

    Walker, Thomas G.

    2005-01-26

    This document provides the quality assurance guidelines that will be followed by the groundwater project.

  10. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect (OSTI)

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  11. QA Corporate Board Meeting - October 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 QA Corporate Board Meeting - October 2014 15th EM Quality Assurance Corporate Board Meeting Meeting Location: Las Vegas, Nevada Room: Nevada Site Office Auditorium Documents Available for Download Meeting Minutes (159.78 KB) Meeting and Presentation Materials (3.64 MB) More Documents & Publications QA Corporate Board Meeting - December 2013 NQA-1: An Overview for Federal Project Directors QA Corporate Board Meeting - November 2012

  12. Office of Civilian Radioactive Waste Management-Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements and Description | Department of Energy Management-Quality Assurance Requirements and Description Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description A report detailling the requirements and description of the Quality Assurance program. Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description (566.23 KB) More Documents & Publications Quality Assurance Requirements Civilian Radioactive Waste

  13. 222-S laboratory quality assurance plan

    SciTech Connect (OSTI)

    Meznarich, H.K.

    1995-04-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client.

  14. Experience with NQA-1 quality assurance standards applied to in vitro bioassay

    SciTech Connect (OSTI)

    Bihl, D.E.; MacLellan, J.A.

    1991-10-01

    On June 1, 1990, the large (about 4000 samples per year) excreta bioassay program at the Hanford Site ceased abruptly when the contract with the bioassay laboratory was terminated. An intense, high-priority effort was begun to replace the services on an interim basis until a new contract could be procured. Despite the urgency to get the excreta bioassay program going again, the Hanford Internal Dosimetry Program was constrained to use only labs that could meet stringent quality assurance (QA) requirements, even during the interim period. The QA requirements were based on NQA-1 with selected additions from the Environmental Protection Agency's QAMS 005/80 (EPA 1983) and the American Society for Testing and Materials' C 1009-83 (ASTM 1984). This constraint was driven both by legal reasons and by the Hanford Site contractors and workers not wanting the quality of the data to be sacrificed. Finding labs that could (1) handle the large throughput, (2) meet the technical requirements, and (3) pass the QA audit proved more difficult than first anticipated. This presentation focuses on the QA requirements that the labs had to meet and how those very broad requirements were applied specifically to excreta bioassay. 5 refs.

  15. Quality assurance plan for the molten salt reactor experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-02-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by Molten Salt Reactor Experiment (MSRE) Remediation Project personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description, Y/QD-15 Rev. 2 (Martin Marietta Energy Systems, Inc., 1995) and Environmental Management and Enrichment Facilities Work Smart Standards. This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRE Remediation Project. This QAP will be periodically reviewed, revised, and approved as necessary. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  16. Independent quality assurance of refinery fugitives testing by western states petroleum association. Final audit report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Research Triangle Institute (RTI) undertook this task for the U.S. Environmental Protection Agency's (EPA's) Office of Air Quality Planning and Standards to provide third-party Quality Assurance (QA) support to a Western States' Petroleum Association (WSPA) program to measure fugitive emissions at petroleum refineries. The primary objectives of the WSPA study were to determine the correlation between screening values and true mass emission rates and to develop a relationship between liquid and gas composition. EPA's QA effort, however, focused only on the correlation objective because the number of leaking components in the California refineries cannot be expected to be representative of refineries in general. The number of components leaking at a given screening value is used in conjunction with the mass correlations to derive the average emission factors.

  17. Office of Standards and Quality Assurance Correspondence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Services » Program Management » Quality Assurance » Office of Standards and Quality Assurance Correspondence Office of Standards and Quality Assurance Correspondence The Safety, Security, and Quality Programs (EM-40) and subsequently the Office of Standards and Quality Assurance (EM-43) place a large emphasis on the fact that the Environmental Management (EM) work of safely cleaning up the environmental legacy of the Cold War is performed in the Field. A primary role of our

  18. Quality Procedure - Audits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audits Quality Procedure - Audits This procedure establishes the responsibilities and process for scheduling, planning, performing, and reporting Quality Assurance (QA) audits of EM-QA-001, Environmental Management Quality Assurance Program implementation at EM Headquarters and Field Office programs, facilities and projects. Quality Procedure - Audits (5.04 MB) More Documents & Publications Quality Procedure - Document Control Quality Procedure - Supplier Qualification Quality Procedure -

  19. Quality assurance plan for the design and construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The WAG 6 Closure Quality Assurance Plan establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 Closure project that are subject to the application of the Martin Marietta Energy Systems, Inc. (Energy Systems) QA Program, the Environmental Restoration Division QA Program, and other quality requirements. These activities may be performed by Energy Systems organizations, a subcontractor to Energy Systems, an architect-engineer (A-E) under prime contract to the Department of Energy (DOE), and/or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems Engineering quality requirements for the project. The WAG 6 Closure QA Plan will be supplemented by subproject QA plans that will identify additional requirements pertaining to each subproject.

  20. Quality assurance plan for the design and construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The WAG 6 Closure Quality Assurance Plan establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 Closure project that are subject to the application of the Martin Marietta Energy Systems, Inc. (Energy Systems) QA Program, the Environmental Restoration Division QA Program, and other quality requirements. These activities may be performed by Energy Systems organizations, a subcontractor to Energy Systems, an architect-engineer (A-E) under prime contract to the Department of Energy (DOE), and/or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems Engineering quality requirements for the project. The WAG 6 Closure QA Plan will be supplemented by subproject QA plans that will identify additional requirements pertaining to each subproject.

  1. Quality Assurance Functional Area Qualification Standard - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    establishes common functional area competency requirements for DOE personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical QA...

  2. Quality Assurance Functional Area Qualification Standard - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    common functional area competency requirements for all DOE QA personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical...

  3. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    SciTech Connect (OSTI)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

  4. Quality Assurance Exchange April 2009, Volume 5 Issue 1

    Office of Energy Efficiency and Renewable Energy (EERE)

    Quality Assurance ExchangeA pril 2009, Volume 5 Issue 1 U.S. Department of Energy Office of Quality Assurance Policy and Assistance IN THE SPOTLIGHT: GEORGE DETSIS, PROGRAM MANAGER Analytical Services Program Office of Corporate Safety Programs

  5. Quality Assurance Exchange September 2005, Volume 1 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange September 2005, Volume 1 Issue 2 U.S. Department of Energy, Off ice of Corporate Performance Assessment Off ice of Quality Assurance Programs (EH-31)

  6. Quality Assurance Exchange January 2007, Volume 3 Issue 1

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange January 2007, Volume 3 Issue 1 U.S. Department of Energy Office of Corporate Safety Analysis

  7. Quality Assurance Exchange August 2007, Volume 3 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange August 2007, Volume 3 Issue 2 U.S. Department of Energy Office of Corporate Safety Analysis

  8. Quality Assurance Exchange Setpebmer 2007, Volume 3 Issue 3

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange Setpebmer 2007, Volume 3 Issue 3 U.S. Department of Energy Office of Corporate Safety Analysis

  9. NMMSS Software Quality Assurance Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NMMSS Software Quality Assurance Plan NMMSS Software Quality Assurance Plan The Software Quality Assurance Plan (SQAP) for the Nuclear Materials Management and Safeguard System (NMMSS) software upgrade project (an actual DOE software development project) can be used as a template to facilitate the creation of the SQA plan for your particular project NMMSS Software Quality Assurance Plan (164.99 KB) More Documents & Publications Configuration Management Plan Software Configuration Management

  10. CERCLA Sites Quality Assurance Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CERCLA Sites Quality Assurance Project Plan CERCLA Sites Quality Assurance Project Plan CERCLA Sites Quality Assurance Project Plan CERCLA Sites Quality Assurance Project Plan (905.68 KB) More Documents & Publications Dispersivity Testing of Zero-Valent Iron Treatment Cells: Monticello, Utah, November 2005 Through February 2008 Closure Sites Performance of a Permeable Reactive Barrier Using Granular Zero-Valent Iron: FY 2004 Annual Report Durango, Colorado, Disposal Site

  11. Project Management Quality Assurance Guide, GPG 017 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Quality Assurance Guide, GPG 017 Project Management Quality Assurance Guide, GPG 017 LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-017 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management Project Management Quality Assurance Guide, GPG 017 (303.89 KB) More Documents & Publications DOE-STD-1054-93 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 Site Selection

  12. QA Corporate Board Meeting - February 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 QA Corporate Board Meeting - February 2011 9th EM Quality Assurance Corporate Board Meeting Meeting Location: U.S. Department of Energy - Oak Ridge, TN - Building 2714 Room: Large Conference Room Agenda for February 16, 2011 Documents Available for Download Meeting and Presentation Materials (10.47 MB) Corporate Board Meeting Minutes (263.22 KB) QA Summit Meeting Minutes (209.27 KB) QA Summit Presentations (2.67 MB) Lessons Learned from the QA Summit (85.76 KB) More Documents &

  13. Quality assurance plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project

    SciTech Connect (OSTI)

    Stewart, K.A.; Rasch, K.A.; Reid, R.W.

    1996-11-01

    This document establishes the Quality Assurance Plan (QAP) for the National Guard Bureau Objective Supply Capability Adaptive Redesign (OSCAR) project activities under the Oak Ridge National Laboratory (ORNL) management. It defines the requirements and assigns responsibilities for ensuring, with a high degree of confidence, that project objectives will be achieved as planned. The QAP outlined herein is responsive to and meets the Quality Assurance Program standards for the U.S. Department of Energy (DOE), Lockheed Martin Energy Research Corporation and ORNL and the ORNL Computing, Robotics, and Education Directorate (CRE). This document is intended to be in compliance with DOE Order 5700.6C, Quality Assurance Program, and the ORNL Standard Practice Procedure, SPP X-QA-8, Quality Assurance for ORNL Computing Software. This standard allows individual organizations to apply the stated requirements in a flexible manner suitable to the type of activity involved. Section I of this document provides an introduction to the OSCAR project QAP; Sections 2 and 3 describe the specific aspects of quality assurance as applicable to the OSCAR project. Section 4 describes the project approach to risk management. The Risk Management Matrix given in Appendix A is a tool to assess, prioritize, and prevent problems before they occur. Therefore, the matrix will be reviewed and revised on a periodic basis.

  14. Quality Assurance Functional Area Qualification Standard

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-04-22

    Replaced by DOE-1150-2013 This QA Functional Area Qualification Standard establishes common functional area competency requirements for DOE personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical QA activities impacting the safe operation of defense nuclear facilities.

  15. Quality Assurance Functional Area Qualification Standard

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOT MEASUREMENT SENSITIVE DOE-STD-1150-2013 December 2013 DOE STANDARD QUALITY ASSURANCE FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. DOE-STD-1150-2013 This document is available on the Department of Energy Technical Standards Program Website at http://www.hss.energy.gov/nuclearsafety/ns/techstds/ ii

  16. Operational excellence (six sigma) philosophy: Application to software quality assurance

    SciTech Connect (OSTI)

    Lackner, M.

    1997-11-01

    This report contains viewgraphs on operational excellence philosophy of six sigma applied to software quality assurance. This report outlines the following: goal of six sigma; six sigma tools; manufacturing vs administrative processes; Software quality assurance document inspections; map software quality assurance requirements document; failure mode effects analysis for requirements document; measuring the right response variables; and questions.

  17. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    SciTech Connect (OSTI)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  18. U.S. Department of Energy, Carlsbad Area Office quality assurance program document. Revision 1

    SciTech Connect (OSTI)

    1996-04-01

    Mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of TRU waste, and establishing an effective system for management of TRU waste from generation to disposal. To help in fulfilling this mission and to ensure that risks and environmental impacts are identified and minimized, and that safety, reliability, and performance are optimized, CAO`s policy is to establish and maintain an effective quality assurance (QA) program that supports compliance with applicable Federal, State, and local regulations, and DOE orders and requirements. This document establishes QA program requirements for all programs, projects, and activities sponsored by CAO.

  19. Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2002-03-01

    The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

  20. Analytical Chemistry Laboratory Quality Assurance Project Plan for the Transuranic Waste Characterization Program

    SciTech Connect (OSTI)

    Sailer, S.J.

    1996-08-01

    This Quality Assurance Project Plan (QAPJP) specifies the quality of data necessary and the characterization techniques employed at the Idaho National Engineering Laboratory (INEL) to meet the objectives of the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Transuranic Waste Characterization Quality Assurance Program Plan (QAPP) requirements. This QAPJP is written to conform with the requirements and guidelines specified in the QAPP and the associated documents referenced in the QAPP. This QAPJP is one of a set of five interrelated QAPjPs that describe the INEL Transuranic Waste Characterization Program (TWCP). Each of the five facilities participating in the TWCP has a QAPJP that describes the activities applicable to that particular facility. This QAPJP describes the roles and responsibilities of the Idaho Chemical Processing Plant (ICPP) Analytical Chemistry Laboratory (ACL) in the TWCP. Data quality objectives and quality assurance objectives are explained. Sample analysis procedures and associated quality assurance measures are also addressed; these include: sample chain of custody; data validation; usability and reporting; documentation and records; audits and 0385 assessments; laboratory QC samples; and instrument testing, inspection, maintenance and calibration. Finally, administrative quality control measures, such as document control, control of nonconformances, variances and QA status reporting are described.

  1. Quality assurance grading guidelines for research and development at DOE facilities. DOE Order 5700.6C

    SciTech Connect (OSTI)

    Powell, T.B.; Morris, R.N.

    1992-10-01

    The quality assurance (QA) requirements for the US Department of Energy (DOE) are established in DOE Order 5700.6C. This order is applicable for all DOE departmental elements, management, and maintenance and operating contractors and requires that documented Quality Assurance Programs (QAPS) are prepared at all levels; it has one attachment. The DOE Office of Energy Research (DOE-ER) has issued a standard to ensure implementation of the full intent of this order in the ER community. This report discusses order 5700.6C in relation to research with DOE.

  2. [Quality assurance in basic research and R&D

    SciTech Connect (OSTI)

    Hoke, P.B.

    1993-05-01

    Oak Ridge National Laboratory (ORNL) is one of the nation`s largest and most widely diversified federal multipurpose research and development centers. The Laboratory is operated by Martin Marietta Energy Systems Inc. for the US DOE. Its mission embraces non-nuclear as well as nuclear energy development together with a wide range of supporting research in engineering, physical sciences, life sciences as well as social sciences and economics. The Laboratory`s program is dominated by four major areas of development that are approximately equal in size: nuclear (fission) energy development, basic physical sciences research, biomedical and environmental, and magnetic fusion energy development. This document outlines ORNL`s quality assurance (QA) program in response to the ten criteria of DOE order 5700.6C. Guidance for implementation comes both from Attachment I of 5700.6C and DOE-ER-STD-6001-92. The basis for the program, integration of DOE orders, program architecture, assessment activities, and financial restraints are discussed.

  3. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel. PDF icon EM Quality ...

  4. Underground Test Area Fiscal Year 2012 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Farnham, Irene; Marutzky, Sam

    2013-01-01

    This report is mandated by the Underground Test Area (UGTA) Quality Assurance Project Plan (QAPP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2012. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2012. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, revising the QAPP, and publishing documents. In addition, processes and procedures were developed to address deficiencies identified in the FY 2011 QAPP gap analysis.

  5. Underground Test Area Fiscal Year 2013 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Krenzien, Susan; Marutzky, Sam

    2014-01-01

    This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2013. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2013. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, and publishing documents. In addition, integrated UGTA required reading and corrective action tracking was instituted.

  6. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

    SciTech Connect (OSTI)

    Krenzien, Susan; Farnham, Irene

    2015-06-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  7. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

    SciTech Connect (OSTI)

    Farnham, Irene; Krenzien, Susan

    2012-10-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  8. Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to determine whether the existing Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is sufficient for work to be performed in the Used Fuel Disposition Campaign (UFDC), and where the existing QAPD is not sufficient, supply recommendations for changes to the QAPD to

  9. Better Buildings Workforce Peer Exchange Quality Assurance Strategies |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Assurance Strategies Better Buildings Workforce Peer Exchange Quality Assurance Strategies Better Buildings Workforce Peer Exchange Quality Assurance Strategies, call slides and discussion summary, November 17, 2011. Call Slides and Discussion Summary (669.89 KB) More Documents & Publications Better Buildings Workforce Peer Exchange Call: Kick-off Recruiting a Local and Diverse Workforce and Mitigating Barriers to Entry Better Buildings Neighborhood Program

  10. Understanding DOE Quality Assurance Requirements and ASME NQA-1 For

    Office of Environmental Management (EM)

    Application in DOE Nuclear Projects Training Agenda | Department of Energy Agenda Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Agenda Agenda for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Workshop held on May 14, 2015. Agenda (36.02 KB) More Documents & Publications Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in

  11. Understanding DOE Quality Assurance Requirements and ASME NQA-1 For

    Office of Environmental Management (EM)

    Application in DOE Nuclear Projects Training Materials | Department of Energy Materials Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Materials Training Materials for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Workshop held on May 14, 2015. Training Materials (4.27 MB) More Documents & Publications Understanding DOE Quality Assurance Requirements

  12. Communication Product Quality Assurance Checklists | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Checklists Communication Product Quality Assurance Checklists These quality assurance checklists list the requirements for Office of Energy Efficiency and Renewable Energy (EERE) publication and exhibit communication products. Office Checklist The EERE Office Requestor, Subject Matter Expert, and/or the EERE Office Communications Lead should ensure the product meets the following requirements. Content is written for its intended audience(s). Content is free from grammatical

  13. Health, Safety, & Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Health, Safety, & Quality Assurance Health, Safety, & Quality Assurance Nuclear Safety and Worker Safety and Health training Nuclear Safety and Worker Safety and Health training PPPO's Safety and Health, Nuclear Safety, and Quality Assurance programs collectively ensure protection of public and worker health and safety and the environment. This is accomplished by empowering and holding accountable managers, employees and contractors to prioritize health, safety and environmental

  14. Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

    SciTech Connect (OSTI)

    Ohler, C.K.

    1991-05-21

    The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

  15. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    SciTech Connect (OSTI)

    Seamans, J.A.

    1995-06-08

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

  16. Understanding DOE Quality Assurance Requirements and ASME NQA...

    Broader source: Energy.gov (indexed) [DOE]

    Materials for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear ... DOE Nuclear Projects, A Management Overview and ...

  17. Nuclear Safety Software & Quality Assurance | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Nuclear Safety Software & Quality Assurance In support of DOE O 410.1, Central Technical Authority Responsibilities Regarding Nuclear Safety Requirements, the Chief of Nuclear...

  18. Office of Civilian Radioactive Waste Management-Quality Assurance...

    Energy Savers [EERE]

    Quality Assurance Requirements Civilian Radioactive Waste Management System Requirements Document Root Cause Analysis Report In Response to Condition Report 5223 Regarding Emails ...

  19. Review of the Sandia Site Office Quality Assurance Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    ... Plan, Rev. 10, 11212 * PLA 10-09, Software Quality Assurance Project Plan, Rev. 00, 1912 * Sandia Site Office Crosscutting Procedure 1304.02, Guidance and Expectations ...

  20. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the Lead Auditor-under instruction (may not be the same as ... a college level curriculum addressing the basic knowledge of quality assurance principles, methods of ...

  1. Software quality assurance at the weapons engineering tritium facility

    SciTech Connect (OSTI)

    Hart, O.

    1997-11-01

    This report contains viewgraphs on the evolution of software quality assurance at the Weapons Engineering Tritium Facility in relation to DOE`s requirements for nuclear facilities.

  2. General Engineer/Physical Scientist (Quality Assurance Engineer)

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will perform oversight and evaluate the M&O; contractors performance in the following functional areas: nuclear facility and weapon quality assurance,...

  3. FAQS Qualification Card - Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs is a set of common Functional Area Qualification Standards (FAQS) and ... More Documents & Publications FAQS Gap Analysis Qualification Card - Quality Assurance ...

  4. Better Buildings Workforce Peer Exchange Quality Assurance Strategies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7, 2011 Better Buildings Workforce Peer Exchange Quality Assurance Strategies Call Slides and Discussion Summary Agenda * Call Logistics and Introductions What is your program ...

  5. Development of a dynamic quality assurance testing protocol for multisite clinical trial DCE-CT accreditation

    SciTech Connect (OSTI)

    Driscoll, B.; Keller, H.; Jaffray, D.; Coolens, C.; Department of Radiation Oncology, University of Toronto, 150 College Street, Toronto, Ontario M5S 3E2; Techna Institute, University Health Network, 124-100 College Street, Toronto, Ontario M5G 1L5

    2013-08-15

    Purpose: Credentialing can have an impact on whether or not a clinical trial produces useful quality data that is comparable between various institutions and scanners. With the recent increase of dynamic contrast enhanced-computed tomography (DCE-CT) usage as a companion biomarker in clinical trials, effective quality assurance, and control methods are required to ensure there is minimal deviation in the results between different scanners and protocols at various institutions. This paper attempts to address this problem by utilizing a dynamic flow imaging phantom to develop and evaluate a DCE-CT quality assurance (QA) protocol.Methods: A previously designed flow phantom, capable of producing predictable and reproducible time concentration curves from contrast injection was fully validated and then utilized to design a DCE-CT QA protocol. The QA protocol involved a set of quantitative metrics including injected and total mass error, as well as goodness of fit comparison to the known truth concentration curves. An additional region of interest (ROI) sensitivity analysis was also developed to provide additional details on intrascanner variability and determine appropriate ROI sizes for quantitative analysis. Both the QA protocol and ROI sensitivity analysis were utilized to test variations in DCE-CT results using different imaging parameters (tube voltage and current) as well as alternate reconstruction methods and imaging techniques. The developed QA protocol and ROI sensitivity analysis was then applied at three institutions that were part of clinical trial involving DCE-CT and results were compared.Results: The inherent specificity of robustness of the phantom was determined through calculation of the total intraday variability and determined to be less than 2.2 1.1% (total calculated output contrast mass error) with a goodness of fit (R{sup 2}) of greater than 0.99 0.0035 (n= 10). The DCE-CT QA protocol was capable of detecting significant deviations from the

  6. Hanford analytical services quality assurance requirements documents

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  7. A retrospective analysis for patient-specific quality assurance of volumetric-modulated arc therapy plans

    SciTech Connect (OSTI)

    Li, Guangjun; Wu, Kui; Peng, Guang; Zhang, Yingjie; Bai, Sen

    2014-01-01

    Volumetric-modulated arc therapy (VMAT) is now widely used clinically, as it is capable of delivering a highly conformal dose distribution in a short time interval. We retrospectively analyzed patient-specific quality assurance (QA) of VMAT and examined the relationships between the planning parameters and the QA results. A total of 118 clinical VMAT cases underwent pretreatment QA. All plans had 3-dimensional diode array measurements, and 69 also had ion chamber measurements. Dose distribution and isocenter point dose were evaluated by comparing the measurements and the treatment planning system (TPS) calculations. In addition, the relationship between QA results and several planning parameters, such as dose level, control points (CPs), monitor units (MUs), average field width, and average leaf travel, were also analyzed. For delivered dose distribution, a gamma analysis passing rate greater than 90% was obtained for all plans and greater than 95% for 100 of 118 plans with the 3%/3-mm criteria. The difference (mean ± standard deviation) between the point doses measured by the ion chamber and those calculated by TPS was 0.9% ± 2.0% for all plans. For all cancer sites, nasopharyngeal carcinoma and gastric cancer have the lowest and highest average passing rates, respectively. From multivariate linear regression analysis, the dose level (p = 0.001) and the average leaf travel (p < 0.001) showed negative correlations with the passing rate, and the average field width (p = 0.003) showed a positive correlation with the passing rate, all indicating a correlation between the passing rate and the plan complexity. No statistically significant correlation was found between MU or CP and the passing rate. Analysis of the results of dosimetric pretreatment measurements as a function of VMAT plan parameters can provide important information to guide the plan parameter setting and optimization in TPS.

  8. Guidance for the Quality Assurance of Fire Protection Systems

    Broader source: Energy.gov [DOE]

    This quality assurance document is intended to provide guidance for the DOE fire protection community in the continuing effort to ensure the reliability of fire protection systems. This guidance document applies the concepts of DOE Order 5700.6C, Quality Assurance, to the management of fire protection systems.

  9. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect (OSTI)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  10. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  11. Using research metrics to evaluate the International Atomic Energy Agency guidelines on quality assurance for R&D

    SciTech Connect (OSTI)

    Bodnarczuk, M.

    1994-06-01

    The objective of the International Atomic Energy Agency (IAEA) Guidelines on Quality Assurance for R&D is to provide guidance for developing quality assurance (QA) programs for R&D work on items, services, and processes important to safety, and to support the siting, design, construction, commissioning, operation, and decommissioning of nuclear facilities. The standard approach to writing papers describing new quality guidelines documents is to present a descriptive overview of the contents of the document. I will depart from this approach. Instead, I will first discuss a conceptual framework of metrics for evaluating and improving basic and applied experimental science as well as the associated role that quality management should play in understanding and implementing these metrics. I will conclude by evaluating how well the IAEA document addresses the metrics from this conceptual framework and the broader principles of quality management.

  12. Quality assurance guidance for field sampling and measurement assessment plates in support of EM environmental sampling and analysis activities

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This document is one of several guidance documents developed by the US Department of Energy (DOE) Office of Environmental Restoration and Waste Management (EM). These documents support the EM Analytical Services Program (ASP) and are based on applicable regulatory requirements and DOE Orders. They address requirements in DOE Orders by providing guidance that pertains specifically to environmental restoration and waste management sampling and analysis activities. DOE 5700.6C Quality Assurance (QA) defines policy and requirements to establish QA programs ensuring that risks and environmental impacts are minimized and that safety, reliability, and performance are maximized. This is accomplished through the application of effective management systems commensurate with the risks imposed by the facility and the project. Every organization supporting EM`s environmental sampling and analysis activities must develop and document a QA program. Management of each organization is responsible for appropriate QA program implementation, assessment, and improvement. The collection of credible and cost-effective environmental data is critical to the long-term success of remedial and waste management actions performed at DOE facilities. Only well established and management supported assessment programs within each EM-support organization will enable DOE to demonstrate data quality. The purpose of this series of documents is to offer specific guidance for establishing an effective assessment program for EM`s environmental sampling and analysis (ESA) activities.

  13. Independent oversight review of the Department of Energy Quality Assurance Program for suspect/counterfeit parts. Revision 1

    SciTech Connect (OSTI)

    1996-05-01

    To address the potential threat that suspect/counterfeit parts could pose to DOE workers and the public, the Office of the Deputy Assistant Secretary for Oversight initiated a number of activities beginning in mid-1995. Oversight placed increased emphasis on the field`s quality assurance-suspect/counterfeit parts programs during safety management evaluations, in keeping with the Office of Environment, Safety and Health (EH) oversight responsibilities, which include oversight of the Department`s quality assurance (QA) programs. In addition, Oversight reviewed relevant policy documents and occurrence reports to determine the nature and magnitude of the problem within the Department. The results of that review, contained in an Office of Oversight report, Independent Oversight Analysis of Suspect/Counterfeit Parts Within the Department of Energy (November 1995), indicate a lack of consistency and comprehensiveness in the Department`s QA-suspect/counterfeit parts program. A detailed analysis of the causes and impacts of the problem was recommended. In response, this review was initiated to determine the effectiveness of the Department`s QA program for suspect/counterfeit parts. This study goes beyond merely assessing and reporting the status of the program, however. It is the authors intention to highlight the complex issues associated with suspect/counterfeit parts in the Department today and to present approaches that DOE managers might consider to address these issues.

  14. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

  15. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    SciTech Connect (OSTI)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein. The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.

  16. Quality assurance/quality control summary report for Phase 1 of the Clinch River remedial investigation. Environmental Restoration Program

    SciTech Connect (OSTI)

    Holladay, S.K.; Bevelhimer, M.S.; Brandt, C.C.

    1994-07-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants released from the US Department of Energy Oak Ridge Reservation and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. Phase 1 of the CRRI was a preliminary study in selected areas of the Clinch River/Watts Bar Reservoir. Fish, sediment, and water samples were collected and analyzed for inorganic, organic, and radiological parameters. Phase 1 was designed to (1) obtain high-quality data to confirm existing historical data for contaminant levels; (2) determine the range of contaminant concentrations present in the river-reservoir system; (3) identify specific contaminants of concern; and (4) establish the reference (background) concentrations for those contaminants. Quality assurance (QA) objectives for Phase I were that (1) scientific data generated would withstand scientific scrutiny; (2) data would be gathered using appropriate procedures for field sampling, chain-of-custody, laboratory analyses, and data reporting; and (3) data would be of known precision and accuracy. These objectives were met through the development and implementation of (1) a QA oversight program of audits and surveillances; (2) standard operating procedures accompanied by a training program; (3) field sampling and analytical laboratory quality control requirements; (4) data and records management systems; and (5) validation of the data by an independent reviewer. Approximately 1700 inorganic samples, 1500 organic samples, and 2200 radiological samples were analyzed and validated. The QA completeness objective for the project was to obtain valid analytical results for at least 95% of the samples collected.

  17. QA Corporate Board Meeting - July 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    08 QA Corporate Board Meeting - July 2008 2nd EM Quality Assurance Corporate Board Meeting Meeting Location: Hyatt Regency Tech Center, 7800 East Tufts Avenue, Denver, Colorado 80237 Room: Windriver Agenda for July 29, 2008 Documents Available for Download Meeting and Presentation Materials (3.01 MB) Meeting Minutes (77.5 KB) More Documents & Publications SOPP-43, EM-23 Quality Assurance Oversight Protocol for EM Review/Field Self-Assessment of Site-Specific QAPs/QIPs Protocol for EM

  18. Development of a one-stop beam verification system using electronic portal imaging devices for routine quality assurance

    SciTech Connect (OSTI)

    Lim, Sangwook; Ma, Sun Young; Jeung, Tae Sig; Yi, Byong Yong; Lee, Sang Hoon; Lee, Suk; Cho, Sam Ju; Choi, Jinho

    2012-10-01

    In this study, a computer-based system for routine quality assurance (QA) of a linear accelerator (linac) was developed by using the dosimetric properties of an amorphous silicon electronic portal imaging device (EPID). An acrylic template phantom was designed such that it could be placed on the EPID and be aligned with the light field of the collimator. After irradiation, portal images obtained from the EPID were transferred in DICOM format to a computer and analyzed using a program we developed. The symmetry, flatness, field size, and congruence of the light and radiation fields of the photon beams from the linac were verified simultaneously. To validate the QA system, the ion chamber and film (X-Omat V2; Kodak, New York, NY) measurements were compared with the EPID measurements obtained in this study. The EPID measurements agreed with the film measurements. Parameters for beams with energies of 6 MV and 15 MV were obtained daily for 1 month using this system. It was found that our QA tool using EPID could substitute for the film test, which is a time-consuming method for routine QA assessment.

  19. Quality Assurance Plan, N springs expedited response action

    SciTech Connect (OSTI)

    Jackson, G.J.

    1994-07-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986).

  20. Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Guide provides information on principles and practices used to establish and implement an effective quality assurance program or quality management system in accordance with the requirements of 10 CFR 830. Cancels DOE G 414.1-2. Canceled by DOE G 414.1-2B.

  1. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect (OSTI)

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  2. Lloyd's Register Quality Assurance, Inc. Now Available as Accredited...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Now Available as Accredited SEP Verification Body Lloyd's Register Quality Assurance, Inc. Now Available as Accredited SEP Verification Body March 16, 2015 - 3:09pm Addthis The U.S. ...

  3. FAQS Reference Guide – Safety Software Quality Assurance

    Broader source: Energy.gov [DOE]

    This reference guide has been developed to address the competency statements in the (March 2011) edition of DOE-STD-1172-2011, Safety Software Quality Assurance Functional Area Qualification Standard.

  4. Signed Quality Assurance Hub Memo | Department of Energy

    Office of Environmental Management (EM)

    In a memorandum to the FieldSite Managers dated July 10, 2009, it was announced that the Office of Standards and Quality Assurance (EM-23) had deployed a pilot prototype web-based ...

  5. Project quality assurance plant: Sodium storage facility, project F-031

    SciTech Connect (OSTI)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.

  6. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  7. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect (OSTI)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  8. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  9. Project Facilitation and Quality Assurance for Federal ESPCs | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Project Facilitation and Quality Assurance for Federal ESPCs Project Facilitation and Quality Assurance for Federal ESPCs Document offers guidance on how to agencies can qualify their own project facilitators after notifying the U.S. Department of Energy Federal Energy Management Program energy savings performance contract (ESPC) program manager in writing who they have designated to serve as the qualifying official and confirming their use of the qualification standards. Download

  10. Model quality assurance program for environmental monitoring of reactor and nonreactor facilities

    SciTech Connect (OSTI)

    Khalil, M.M.; Hetrick, C.S.; Tuckfield, R.C. )

    1991-11-01

    The US Department of Energy (DOE) has raised specific concerns regarding the reliability of the work being performed by DOE's subcontract laboratories. This concern precipitated from the investigation of three major laboratories performing analyses for DOE sites during 1990. During the last 3 years, a comprehensive quality assurance (QA) improvement program was established for the radiological and nonradiological environmental monitoring programs at the Savannah River site (SRS). The primary objective of the program is to ensure that accurate, precise, and defensible environmental monitoring data are produced in house and within subcontract laboratories. The program is built into the routine activities of the environmental monitoring section (EMS) laboratory as established in DOE Order 5700.6B/NQA-1 and can be used as a model for environmental monitoring of reactor and nonreactor facilities, waste characterization, and analysis programs.