Sample records for owner location capacity

  1. br Owner br Facility br Type br Capacity br MW br Commercial br Online

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin: EnergyWyandanch,Eaga SolarZolo Technologies IncusgbcblackOwner

  2. br Owner br Facility br Type br Capacity br MW br Commercial...

    Open Energy Info (EERE)

    Facility br Type br Capacity br MW br Commercial br Online br Date br Geothermal br Area br Geothermal br Region Coordinates Ahuachapan Geothermal Power Plant LaGeo SA de CV Single...

  3. Business Owners: Prepare for Utility Disruptions | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Disruptions Business Owners: Prepare for Utility Disruptions Business Owners: Prepare for Utility Disruptions Have a plan in place in case a natural disaster or other...

  4. Reliability Standards Owner

    Broader source: Energy.gov [DOE]

    This position is located in the Internal Operations and Asset Management group of Planning and Asset Management (TP). A successful candidate in this position will serve as the Reliability Standards...

  5. Owners of nuclear power plants

    SciTech Connect (OSTI)

    Hudson, C.R.; White, V.S.

    1996-11-01T23:59:59.000Z

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

  6. Corporate Law's Current-Owner Bias

    E-Print Network [OSTI]

    Fried, Jesse M.

    2005-01-01T23:59:59.000Z

    Owner Bias in Corporate Governance Jesse Fried * Boalt Hallmy conclusion that corporate governance arrangements choseninterventions in corporate governance through the securities

  7. Corporate Law's Current-Owner Bias

    E-Print Network [OSTI]

    Fried, Jesse M.

    2006-01-01T23:59:59.000Z

    Owner Bias in Corporate Governance Jesse Fried * Boalt Hallmy conclusion that corporate governance arrangements choseninterventions in corporate governance through the securities

  8. Dispute Resolution Process Utility Owner

    E-Print Network [OSTI]

    Minnesota, University of

    State One Call (GSOC) for "Design Call" Provide "as-builts", marked plans or field locates MnDOT Utility? Underground Utility? Contact Minnesota Office of Pipeline Safety Minnesota Office of Pipeline Safety Step 1 - Utility Identification for Construction Investigate and take appropriate action up to and including

  9. Tips For Residential Heating Oil Tank Owners

    E-Print Network [OSTI]

    Maroncelli, Mark

    · · · · · · · · · · · · · · · · · · · · · · Tips For Residential Heating Oil Tank Owners Source: DEP Fact Sheet Residential heating oil tanks are used to store fuel for furnaces or boilers to heat

  10. The Strange Career of DDT: Experts, Federal Capacity, and Environmentalism in World War II

    E-Print Network [OSTI]

    Russell, Edmund P.

    1999-10-01T23:59:59.000Z

    Reproduced with permission of the copyright owner. Further reproduction prohibited without permission. The strange career of DDT: Experts, federal capacity, and environmentalism in World War II Russell, Edmund P, III Technology and Culture; Oct...

  11. Governmental-Owner Power Imbalance and Privatization

    E-Print Network [OSTI]

    Xu, Kehan

    2011-10-21T23:59:59.000Z

    fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Approved by: Chair of Committee, Laszlo Tihanyi Committee Members, Michael Hitt Lorraine Eden Allan (Haipeng) Chen Head of Department, Murray Barrick August 2010... Major Subject: Management iii ABSTRACT Governmental-Owner Power Imbalance and Privatization. (August 2010) Kehan Xu, B.S., China Criminal Police College; M.B.A., University of Miami Chair of Advisory Committee: Dr. Laszlo Tihanyi...

  12. Property:Owner | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with form History Facebook icon Twitter iconNumOfPlants Jump to:Tool/KeywordOwner

  13. DOE/NNSA Facility Management Contracts Facility Owner Contractor

    Broader source: Energy.gov (indexed) [DOE]

    NNSA Facility Management Contracts Facility Owner Contractor Award Date End Date OptionsAward Term Ultimate Potential Expiration Date Contract FY Competed Parent Companies LLC...

  14. Rights and Duties of Mines and Mine Owners, General (Missouri)

    Broader source: Energy.gov [DOE]

    This legislation addresses general operational guidelines for mine owners regarding public notices, fees, land and mineral ownership, requirements for mining in certain municipalities, and mining...

  15. "Table HC3.5 Space Heating Usage Indicators by Owner-Occupied...

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Space Heating Usage Indicators by Owner-Occupied Housing Unit, 2005" " Million U.S. Housing Units" ,," Owner-Occupied Housing Units (millions)","Type of Owner-Occupied Housing...

  16. Guide to Combined Heat and Power Systems for Boiler Owners and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Heat and Power Systems for Boiler Owners and Operators, July 2004 Guide to Combined Heat and Power Systems for Boiler Owners and Operators, July 2004 Many owners and...

  17. MAINE MULTIFAMILY BUILDING OWNERS TRUST IN EFFICIENCY | Department...

    Broader source: Energy.gov (indexed) [DOE]

    MAINE MULTIFAMILY BUILDING OWNERS TRUST IN EFFICIENCY Nearly 70% of households in Maine rely on fuel oil as their primary energy source for home heating, more than any other state....

  18. Owner/contractor work structure process with integrated alignment framework

    E-Print Network [OSTI]

    Sullivan, George Ray

    1996-01-01T23:59:59.000Z

    capital program expenditures , and to improve operational efficiency. For their capital projects, owners want the highest quality project, as fast as possible, at the lowest possible cost, with no harm to workers or the environment. To accomplish this...

  19. The Impact of Energy Information Upon Small Business Owners

    E-Print Network [OSTI]

    Franklin, Casey Gail

    2014-05-31T23:59:59.000Z

    . Findings indicated that although each participant expressed an interest in conserving energy, none were regularly engaging with their electricity consumption information through the online monitor. Business owners did not find the monitor useful because...

  20. Hot Works Procedures and Protocols Last Updated: 2/14/2014 Owner: Safety and Risk Management Director Page 1 of 6

    E-Print Network [OSTI]

    Dyer, Bill

    Hot Works Procedures and Protocols Last Updated: 2/14/2014 Owner: Safety and Risk Management Management Director Page 2 of 6 start and stop times, and location of work. The Office of Work Control and Risk Management reserves the right to inspect all Hot Works areas, and revoke authorizations

  1. Design Team:Owners Team: Solaris Group, LLC

    E-Print Network [OSTI]

    Solaris Port of Benton NORTH #12;Climate and Design Maximize East/West Solar Orientation · Reduce ThermalDesign Team:Owners Team: Solaris Group, LLC a management company TRI-CITIES RESEARCH DISTRICT Prevailing Winds for Passive Site Cooling · Deter Winter Gusts · Protection via Walkway Screens and Canopies

  2. COMMUNITY RESILIENCE: WORKSHOPS ON PRIVATE SECTOR AND PROPERTY OWNER

    E-Print Network [OSTI]

    STATES DEPARTMENT OF ENERGY under Contract DE-AC05-76RL01830 #12;Acknowledgments The authors would like to acknowledge and thank the businesses, building owners, service providers, and representatives who participated .....................................................................................3 4.1 Workshop with Private Sector Businesses on August 12

  3. How life insurance can benefit the business owner

    SciTech Connect (OSTI)

    Byles, B.

    1993-02-01T23:59:59.000Z

    There are many situations when life insurance can fill the financial needs of business owners. Three of the most common needs are business continuation/value conservation (buy-sell agreement), asset conservation upon death or disability of a key employee (replace the value of a key employee upon death or disability), and the reward and retention of selected employees (bonus or deferred compensation). Let's take a closer look to see why life insurance makes sense in these three areas.

  4. Building Energy Asset Score: Building Owners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof Energy Future ofHydronicBuildingDepartment ofCodesBuilding Owners

  5. Guide to Combined Heat and Power Systems for Boiler Owners and...

    Broader source: Energy.gov (indexed) [DOE]

    the Department of Energy to improve steam system performance. Guide to Combined Heat and Power Systems for Boiler Owners and Operators (July 2004) More Documents & Publications...

  6. Next Location Prediction Within a Smart Office Building Jan Petzold, Faruk Bagci, Wolfgang Trumler, and Theo Ungerer

    E-Print Network [OSTI]

    Vintan, Lucian N.

    Next Location Prediction Within a Smart Office Building Jan Petzold, Faruk Bagci, Wolfgang Trumler is notified about the probable next location of an absent office owner within a smart office building the efficiency of several prediction methods. The scenario concerns employees in an office building visiting

  7. Capacity Markets for Electricity

    E-Print Network [OSTI]

    Creti, Anna; Fabra, Natalia

    2004-01-01T23:59:59.000Z

    Designing Markets for Electricity. Wiley IEEE Press. [25]in the England and Wales Electricity Market, Power WorkingFelder (1996), Should Electricity Markets Have a Capacity

  8. ORISE: Capacity Building

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capacity Building Because public health agencies must maintain the resources to respond to public health challenges, critical situations and emergencies, the Oak Ridge Institute...

  9. Liquid heat capacity lasers

    DOE Patents [OSTI]

    Comaskey, Brian J. (Walnut Creek, CA); Scheibner, Karl F. (Tracy, CA); Ault, Earl R. (Livermore, CA)

    2007-05-01T23:59:59.000Z

    The heat capacity laser concept is extended to systems in which the heat capacity lasing media is a liquid. The laser active liquid is circulated from a reservoir (where the bulk of the media and hence waste heat resides) through a channel so configured for both optical pumping of the media for gain and for light amplification from the resulting gain.

  10. Knudsen heat capacity

    SciTech Connect (OSTI)

    Babac, Gulru, E-mail: babac@itu.edu.tr [Institute of Energy, Istanbul Technical University, Istanbul 34469 (Turkey)] [Institute of Energy, Istanbul Technical University, Istanbul 34469 (Turkey); Reese, Jason M. [School of Engineering, University of Edinburgh, Edinburgh EH9 3JL (United Kingdom)] [School of Engineering, University of Edinburgh, Edinburgh EH9 3JL (United Kingdom)

    2014-05-15T23:59:59.000Z

    We present a Knudsen heat capacity as a more appropriate and useful fluid property in micro/nanoscale gas systems than the constant pressure heat capacity. At these scales, different fluid processes come to the fore that are not normally observed at the macroscale. For thermodynamic analyses that include these Knudsen processes, using the Knudsen heat capacity can be more effective and physical. We calculate this heat capacity theoretically for non-ideal monatomic and diatomic gases, in particular, helium, nitrogen, and hydrogen. The quantum modification for para and ortho hydrogen is also considered. We numerically model the Knudsen heat capacity using molecular dynamics simulations for the considered gases, and compare these results with the theoretical ones.

  11. The multicast capacity region of large wireless networks

    E-Print Network [OSTI]

    Shah, Devavrat

    We study the problem of determining the multicast capacity region of a wireless network of n nodes randomly located in an extended area and communicating with each other over Gaussian fading channels. We obtain an explicit ...

  12. Figure 4: Case study network Maximising Renewable Capacity

    E-Print Network [OSTI]

    Harrison, Gareth

    . A variety of techniques have been used for distribution system optimisations. Here, Optimal Power Flow (OPF at several combinations of locations (DG at 0.9 lagging power factor). 3.5 MW of capacity is foundW is allocated at A. Without network reinforcement connection of the full 3.5 MW of mini-hydro capacity

  13. MEMORANDUM OWNER(S)

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling CorpNewCF INDUSTRIES,L? .-IGY DATE---I TO:

  14. OWNER(S)

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN .METALS~ c3 Alexander9412,l . . ;

  15. OWNER(S)

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN .METALS~ c3 Alexander9412,l . .

  16. OWNER(S)

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN .METALS~ c3 Alexander9412,l .

  17. OWNER(S) Past:

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN .METALS~ c3 Alexander9412,l

  18. SUBJECT: OWNER(S)

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN3u ;;;:: A' 3

  19. Refinery Capacity Report

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    by State as of January 1, 2006 PDF 5 Refiners' Operable Atmospheric Crude Oil Distillation Capacity as of January 1, 2006 PDF 6 Operable Crude Oil and Downstream Charge...

  20. Refinery Capacity Report

    Gasoline and Diesel Fuel Update (EIA)

    Capacity Report June 2014 With Data as of January 1, 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by...

  1. Forward capacity market CONEfusion

    SciTech Connect (OSTI)

    Wilson, James F.

    2010-11-15T23:59:59.000Z

    In ISO New England and PJM it was assumed that sponsors of new capacity projects would offer them into the newly established forward centralized capacity markets at prices based on their levelized net cost of new entry, or ''Net CONE.'' But the FCCMs have not operated in the way their proponents had expected. To clear up the CONEfusion, FCCM designs should be reconsidered to adapt them to the changing circumstances and to be grounded in realistic expectations of market conduct. (author)

  2. An Internet survey of private pond owners and managers in Texas

    E-Print Network [OSTI]

    Schonrock, April Elizabeth

    2005-11-01T23:59:59.000Z

    pond owners got the information they used to deal with pond management problems. A secondary emphasis of the project was to examine the potential presented by the Internet for use in this type of information gathering and distribution for Texas...

  3. DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference

    Broader source: Energy.gov [DOE]

    More than 150 energy sector leadersincluding nearly 100 asset owners and operatorsgathered at the 2009 EnergySec Annual Summit in Seattle, WA, on Sept. 23-24, where researchers from the...

  4. Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01T23:59:59.000Z

    This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

  5. Dual capacity reciprocating compressor

    DOE Patents [OSTI]

    Wolfe, R.W.

    1984-10-30T23:59:59.000Z

    A multi-cylinder compressor particularly useful in connection with northern climate heat pumps and in which different capacities are available in accordance with reversing motor rotation is provided with an eccentric cam on a crank pin under a fraction of the connecting rods, and arranged for rotation upon the crank pin between opposite positions 180[degree] apart so that with cam rotation on the crank pin such that the crank throw is at its normal maximum value all pistons pump at full capacity, and with rotation of the crank shaft in the opposite direction the cam moves to a circumferential position on the crank pin such that the overall crank throw is zero. Pistons whose connecting rods ride on a crank pin without a cam pump their normal rate with either crank rotational direction. Thus a small clearance volume is provided for any piston that moves when in either capacity mode of operation. 6 figs.

  6. Dual capacity reciprocating compressor

    DOE Patents [OSTI]

    Wolfe, Robert W. (Wilkinsburg, PA)

    1984-01-01T23:59:59.000Z

    A multi-cylinder compressor 10 particularly useful in connection with northern climate heat pumps and in which different capacities are available in accordance with reversing motor 16 rotation is provided with an eccentric cam 38 on a crank pin 34 under a fraction of the connecting rods, and arranged for rotation upon the crank pin between opposite positions 180.degree. apart so that with cam rotation on the crank pin such that the crank throw is at its normal maximum value all pistons pump at full capacity, and with rotation of the crank shaft in the opposite direction the cam moves to a circumferential position on the crank pin such that the overall crank throw is zero. Pistons 24 whose connecting rods 30 ride on a crank pin 36 without a cam pump their normal rate with either crank rotational direction. Thus a small clearance volume is provided for any piston that moves when in either capacity mode of operation.

  7. Connecting Distributed Energy Resources to the Grid: Their Benefits to the DER Owner etc.

    SciTech Connect (OSTI)

    Poore, WP

    2003-07-09T23:59:59.000Z

    The vision of the Distributed Energy Research Program (DER) program of the U.S. Department of Energy (DOE) is that the United States will have the cleanest and most efficient and reliable energy system in the world by maximizing the use of affordable distributed energy resources. Electricity consumers will be able to choose from a diverse number of efficient, cost-effective, and environmentally friendly distributed energy options and easily connect them into the nation's energy infrastructure while providing benefits to their owners and other stakeholders. The long-term goal of this vision is that DER will achieve a 20% share of new electric capacity additions in the United States by 2010, thereby helping to make the nation's electric power generation and delivery system more efficient, reliable, secure, clean, economical, and diverse in terms of fuel use (oil, natural gas, solar, hydroelectric, etc.) and prime mover resource (solar, wind, gas turbines, etc.). Near- and mid-term goals are to develop new technologies for implementing and operating DER and address barriers associated with DER usage and then to reduce costs and emissions and improve the efficiency and reliability of DER. Numerous strategies for meeting these goals have been developed into a research, development, and demonstration (RD&D) program that supports generation and delivery systems architecture, including modeling and simulation tools. The benefits associated with DER installations are often significant and numerous. They almost always provide tangible economic benefits, such as energy savings or transmission and distribution upgrade deferrals, as well as intangible benefits, such as power quality improvements that lengthen maintenance or repair intervals for power equipment. Also, the benefits routinely are dispersed among end users, utilities, and the public. For instance, an end user may use the DER to reduce their peak demand and save money due to lower demand charges. Reduced end user peak demand, in turn, may lower a distribution system peak load such that upgrades are deferred or avoided. This could benefit other consumers by providing them with higher reliability and power quality as well as avoiding their cost share of a distribution system upgrade. In this example, the costs of the DER may be born by the end user, but that user reaps only a share of the benefits. This report, the first product of a study to quantify the value of DER, documents initial project efforts to develop an assessment methodology. The focus of currently available site-specific DER assessment techniques are typically limited to two parties, the owner/user and the local utility. Rarely are the impacts on other stakeholders, including interconnected distribution utilities, transmission system operators, generating system operators, other local utility customers, local and regional industry and business, various levels of government, and the environment considered. The goal of this assessment is to quantify benefits and cost savings that accrue broadly across a region, recognizing that DER installations may have local, regional, or national benefits.

  8. Quantum Channel Capacities

    E-Print Network [OSTI]

    Graeme Smith

    2010-07-16T23:59:59.000Z

    A quantum communication channel can be put to many uses: it can transmit classical information, private classical information, or quantum information. It can be used alone, with shared entanglement, or together with other channels. For each of these settings there is a capacity that quantifies a channel's potential for communication. In this short review, I summarize what is known about the various capacities of a quantum channel, including a discussion of the relevant additivity questions. I also give some indication of potentially interesting directions for future research.

  9. Locating Semantic Reference

    E-Print Network [OSTI]

    Pepp, Jessica Alden

    2012-01-01T23:59:59.000Z

    capacities, such as eyeglasses and microscopes. Theseby apparatus, such as eyeglasses, magnifiers, telescopes,They are tools, like eyeglasses or telescopes, which may be

  10. Library Locations Locations other than Main Library

    E-Print Network [OSTI]

    Library Locations Locations other than Main Library Example: Feminist Studies HQ1410 .U54 2009 University of California, Santa Barbara Library www.library.ucsb.edu Updated 3-2014 A - B.......................................6 Central M - N..................................................Arts Library (Music Building) P

  11. REVIEW OF TRANSAMERICA DELAVAL INC. DIESEL GENERATOR OWNERS' GROUP ENGINE REQUALIFICATION PROGRAM

    SciTech Connect (OSTI)

    Berlinger, C. H.

    1985-12-01T23:59:59.000Z

    In December 1983, 13 nuclear utilities that own TDI diesel generators formally established an Owners Group to address concerns regarding the reliability and operability of these engines. The Owners' Group program for engine requalification consisted of four major elements: 1) resolution of known problems with potentially generic implications, 2) a design review and quality revalidation (DR/QR) effort aimed at identifying and correcting potential problems with the important engine components, 3) expanded engine testing and inspection, and 4) enhanced engine maintenance and surveillance (M/S) to maintain the qualification of the diesel engines for the lifetime of the nuclear plants that they service. In providing technical support to NRC, the PNL project staff, assisted by a number of diesel engine consultants, focused on the four major elements of the Owners' Group engine requalification program, addressing both generic and plant-specific areas.

  12. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity Report

  13. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity Report5

  14. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity

  15. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity Operable

  16. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity

  17. Refinery Capacity Report

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source:Additions to Capacity onThousand(Dollars2009Rail

  18. Refinery Capacity Report Historical

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source:Additions to Capacity onThousand(Dollars2009Rail

  19. ORISE: Capacity Building

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparencyDOE Project *1980-1981 U.S.CapabilitiesCapacity Building

  20. A unique program for horse business owners Tuesdays, February 5 -March 19 (seven weeks)

    E-Print Network [OSTI]

    Goodman, Robert M.

    A unique program for horse business owners Tuesdays, February 5 - March 19 (seven weeks) 6:00pm ­ 9 budgeting plan by the end of the seven-week course. The course is offered by Dr. Carey Williams, Equine@njaes.rutgers.edu, 848-932-3229 $70.00 per person Dinner and Companion workbook included. Equine Business Planning Course

  1. Tour of Entergy's Nuclear Power Plant in River Bend Owner: Entergy Gulf States Inc.

    E-Print Network [OSTI]

    Ervin, Elizabeth K.

    Tour of Entergy's Nuclear Power Plant in River Bend Owner: Entergy Gulf States Inc. Reactor Type a nuclear power plant. Plant was Entergy, a Boiling Water Reactor (BWR) type. Built in the 80's, it has of the veteran plant workers. The presentation gave the nuclear plant engineering basics and built

  2. WORKING PAPER N 2013 11 The Grey Paradox: How Oil Owners Can Benefit

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    , Fossil Fuels, GlobalWarming, Non-renewable Resources, OPEC PARIS-JOURDAN SCIENCES ECONOMIQUES 48, BD, Fossil Fuels, Global Warming, Non-renewable Resources, OPEC. JEL Classication: H21, H23, Q31, Q38, Q41, Q of fossil-fuel owners de- pends on the characteristics of their fossil fuels (recoverable reserves

  3. Reversible micromachining locator

    DOE Patents [OSTI]

    Salzer, L.J.; Foreman, L.R.

    1999-08-31T23:59:59.000Z

    This invention provides a device which includes a locator, a kinematic mount positioned on a conventional tooling machine, a part carrier disposed on the locator and a retainer ring. The locator has disposed therein a plurality of steel balls, placed in an equidistant position circumferentially around the locator. The kinematic mount includes a plurality of magnets which are in registry with the steel balls on the locator. In operation, a blank part to be machined is placed between a surface of a locator and the retainer ring (fitting within the part carrier). When the locator (with a blank part to be machined) is coupled to the kinematic mount, the part is thus exposed for the desired machining process. Because the locator is removably attachable to the kinematic mount, it can easily be removed from the mount, reversed, and reinserted onto the mount for additional machining. Further, the locator can likewise be removed from the mount and placed onto another tooling machine having a properly aligned kinematic mount. Because of the unique design and use of magnetic forces of the present invention, positioning errors of less than 0.25 micrometer for each machining process can be achieved. 7 figs.

  4. Reversible micromachining locator

    DOE Patents [OSTI]

    Salzer, Leander J. (Los Alamos, NM); Foreman, Larry R. (Los Alamos, NM)

    1999-01-01T23:59:59.000Z

    This invention provides a device which includes a locator, a kinematic mount positioned on a conventional tooling machine, a part carrier disposed on the locator and a retainer ring. The locator has disposed therein a plurality of steel balls, placed in an equidistant position circumferentially around the locator. The kinematic mount includes a plurality of magnets which are in registry with the steel balls on the locator. In operation, a blank part to be machined is placed between a surface of a locator and the retainer ring (fitting within the part carrier). When the locator (with a blank part to be machined) is coupled to the kinematic mount, the part is thus exposed for the desired machining process. Because the locator is removably attachable to the kinematic mount, it can easily be removed from the mount, reversed, and reinserted onto the mount for additional machining. Further, the locator can likewise be removed from the mount and placed onto another tooling machine having a properly aligned kinematic mount. Because of the unique design and use of magnetic forces of the present invention, positioning errors of less than 0.25 micrometer for each machining process can be achieved.

  5. g:\\fpdc\\contracts unit\\consultant selection and agreement forms\\consultant agreements\\owner consultant agreement final pdc.doc Page 1 of 24

    E-Print Network [OSTI]

    Dyer, Bill

    \\owner consultant agreement final pdc.doc Page 1 of 24 MONTANA STATE UNIVERSITY PLANNING, DESIGN & CONSTRUCTION 6TH forms\\consultant agreements\\owner consultant agreement final pdc.doc Page 2 of 24 TABLE OF CONTENTS PART\\consultant selection and agreement forms\\consultant agreements\\owner consultant agreement final pdc.doc Page 3 of 24 1

  6. Reversible micromachining locator

    DOE Patents [OSTI]

    Salzer, Leander J. (Los Almos, NM); Foreman, Larry R. (late of Los Alamos, NM)

    2002-01-01T23:59:59.000Z

    A locator with a part support is used to hold a part onto the kinematic mount of a tooling machine so that the part can be held in or replaced in exactly the same position relative to the cutting tool for machining different surfaces of the part or for performing different machining operations on the same or different surfaces of the part. The locator has disposed therein a plurality of steel balls placed at equidistant positions around the planar surface of the locator and the kinematic mount has a plurality of magnets which alternate with grooves which accommodate the portions of the steel balls projecting from the locator. The part support holds the part to be machined securely in place in the locator. The locator can be easily detached from the kinematic mount, turned over, and replaced onto the same kinematic mount or another kinematic mount on another tooling machine without removing the part to be machined from the locator so that there is no need to touch or reposition the part within the locator, thereby assuring exact replication of the position of the part in relation to the cutting tool on the tooling machine for each machining operation on the part.

  7. TAGGING, TRACKING AND LOCATING WITHOUT GPS

    SciTech Connect (OSTI)

    Cordaro, J.; Coleman, T.; Shull, D.

    2012-07-08T23:59:59.000Z

    The Savannah River National Laboratory (SRNL) was requested to lead a Law Enforcement Working Group that was formed to collaborate on common operational needs. All agencies represented on the working group ranked their need to tag, track, and locate a witting or unwitting target as their highest priority. Specifically, they were looking for technologies more robust than Global Positioning Satellite (GPS), could communicate back to the owner, and worked where normal cell phone communications did not work or were unreliable. SRNL brought together multiple technologies in a demonstration that was held in in various Alaska venues, including metropolitan, wilderness, and at-sea that met the working group's requirements. Using prototypical technologies from Boeing, On Ramp, and Fortress, SRNL was able to demonstrate the ability to track personnel and material in all scenarios including indoors, in heavily wooden areas, canyons, and in parking garages. In all cases GPS signals were too weak to measure. Bi-directional communication was achieved in areas that Wi-Fi, cell towers, or traditional radios would not perform. The results of the exercise will be presented. These technologies are considered ideal for tracking high value material such has nuclear material with a platform that allows seamless tracking anywhere in the world, indoors or outdoors.

  8. Federal offshore oil and gas lease bonus bid rejections: viewpoints of bidders and owners

    SciTech Connect (OSTI)

    Lohrenz, J.; Dougherty, E.L.

    1983-03-01T23:59:59.000Z

    The Federal Government currently estimates values of leases offered in offshore oil and gas sales. After sales, the estimates are compared with highest bonus bids to decide whether to issue a lease or not. Over the past decade the Government has opted via this process not to issue leases on approximately one out of seven leases receiving bonus bids. The Government avows this assures fair market value is received. The authors believe this avowal is hogwash. The authors support this belief with logical argument, quantitative analysis, and statistical study. They conclude that by following the current policy, the Federal Government acting as agent for all of us, the collected people and owners of the lands in question, is acting to the detriment of the account they should serve. Alternative policies are proposed which both increase the efficiency of bringing offshore oil and gas resources to use and decrease the expense the Government burdens the owners with.

  9. The effect of landownership change among small woodland owners on timber availability in East Texas

    E-Print Network [OSTI]

    Gehlhausen, Randy Joe

    1976-01-01T23:59:59.000Z

    Forest Ownership Past Management Practices Past Harvesting H1. story Futu e Nanagement Intentions Future Harvesting Plans Statistical Analysis of Landowner Ccaracteristics Restrictions 18 20 22 22 25 25 25 29 29 29 33 33 33 36 39 48... of respondents according to future plans to consult foresters 51 24. Distribution of respondents according to future plans to participate in assistance programs 53 25, Willingness to sell timber among owners of less than 100 acres of 56 forest 26. Summary...

  10. Locating Heat Recovery Opportunities

    E-Print Network [OSTI]

    Waterland, A. F.

    1981-01-01T23:59:59.000Z

    Basic concepts of heat recovery are defined as they apply to the industrial community. Methods for locating, ranking, and developing heat recovery opportunities are presented and explained. The needs for useful heat 'sinks' are emphasized as equal...

  11. Locating Heat Recovery Opportunities

    E-Print Network [OSTI]

    Waterland, A. F.

    1981-01-01T23:59:59.000Z

    Basic concepts of heat recovery are defined as they apply to the industrial community. Methods for locating, ranking, and developing heat recovery opportunities are presented and explained. The needs for useful heat 'sinks' are emphasized as equal...

  12. Design-Build and CM at Risk- comparative analysis for owner decision making based on case studies and project surveys

    E-Print Network [OSTI]

    Park, Soon Rock

    2012-07-16T23:59:59.000Z

    Currently, many researchers and stakeholders believe that effective delivery systems for construction projects are key to improving project quality and value in the construction industry. Therefore, it is important that owners use the best project...

  13. Overview paper Stochasticity of freeway operational capacity and chance-constrained

    E-Print Network [OSTI]

    Levinson, David M.

    . It is found that values of freeway operational capacity under different traffic flow conditions generally fit homepage: www.elsevier.com/locate/trc ARTICLE IN PRESS Please cite this article in press as: Liu, H.X., Wu

  14. Community Resilience: Workshops on Private Sector and Property Owner Requirements for Recovery and Restoration from a Diasaster

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Stein, Steven L.; Lesperance, Ann M.

    2008-12-22T23:59:59.000Z

    This report summarizes the results of a proejct sponsored by DTRA to 1) Assess the readiness of private-sector businesses, building owners, and service providers to restore property and recover operations in the aftermath of a wide-area dispersal of anthrax; and 2) Understand what private property owners and businesses "want and need" from federal, state, and local government to support recovery and restoration from such an incident.

  15. MEASUREMENT OF SPECIFIC HEAT CAPACITY OF SALTSTONE

    SciTech Connect (OSTI)

    Harbour, J; Vickie Williams, V

    2008-09-29T23:59:59.000Z

    One of the goals of the Saltstone variability study is to identify (and quantify the impact of) the operational and compositional variables that control or influence the important processing and performance properties of Saltstone grout mixtures. The heat capacity of the Saltstone waste form is one of the important properties of Saltstone mixes that was last measured at SRNL in 1997. It is therefore important to develop a core competency for rapid and accurate analysis of the specific heat capacity of the Saltstone mixes in order to quantify the impact of compositional and operational variations on this property as part of the variability study. The heat capacity, coupled with the heat of hydration data obtained from isothermal calorimetry for a given Saltstone mix, can be used to predict the maximum temperature increase in the cells within the vaults of the Saltstone Disposal Facility (SDF). The temperature increase controls the processing rate and the pour schedule. The maximum temperature is also important to the performance properties of the Saltstone. For example, in mass pours of concrete or grout of which Saltstone is an example, the maximum temperature increase and the maximum temperature difference (between the surface and the hottest location) are controlled to ensure durability of the product and prevent or limit the cracking caused by the thermal gradients produced during curing. This report details the development and implementation of a method for the measurement of the heat capacities of Saltstone mixes as well as the heat capacities of the cementitious materials of the premix and the simulated salt solutions used to batch the mixes. The developed method utilizes the TAM Air isothermal calorimeter and takes advantage of the sophisticated heat flow measurement capabilities of the instrument. Standards and reference materials were identified and used to validate the procedure and ensure accuracy of testing. Heat capacities of Saltstone mixes were {approx} 55% higher than the previous measurement of specific heat capacity on a reference Saltstone mix in 1997. Values of mixes prepared using Deliquification, Dissolution and Adjustment (DDA), Modular Caustic Side Solvent Extraction Unit (MCU) and Salt Waste Processing Facility (SWPF) simulants and premix at 0.60 w/cm ratio were {approx} 1.95 J/g/{sup o}C and were equivalent within experimental error. The simple law of mixtures was used to predict the heat capacities of the Saltstone and the results were in excellent agreement with experimental data. This simple law of mixtures can therefore be used to predict the heat capacities of Saltstone mixes in those cases where measurements have not been made. The time dependence of the heat capacity is important as an input to the modeling of temperature increase in Saltstone vaults. The heat capacity of a mix of MCU and premix at 0.60 w/cm ratio was measured immediately after initial mixing and then periodically up to times greater than 100 days. Within experimental error, the heat capacity did not change with time. Therefore, the modeling is not complicated by requiring a time dependent function for specific heat capacity. The water to cementitious material (w/cm) ratio plays a key role in determining the value of the heat capacity. Both experimental and predictive values for SWPF mixes as function of the w/cm ratio were obtained and presented in this report. Predictions of the maximum temperatures of the Saltstone mixes were made using the heat of hydration data from previous isothermal measurements and the newly measured heat capacities for DDA, MCU and SWPF mixes. The maximum temperature increase ranged from 37 to 48 C for these mixes. The presence of aluminate at 0.33 M produced a temperature increase of 68 C which is close to the adiabatic temperature rise of 74 C observed by Steimke and Fowler in 1997 for a mix containing 0.35 M aluminate. Aluminum dissolution of the sludge will increase the aluminate in the DSS which in turn will result in a larger temperature increase in the Saltstone vaults during the curing p

  16. A California generation capacity market

    SciTech Connect (OSTI)

    Conkling, R.L.

    1998-10-01T23:59:59.000Z

    California, overconfident with its new Power Exchange spot market, seems unaware that it could be afflicted by the same turmoil that bludgeoned the Midwest in June. An electricity capacity market should be put in place before crisis strikes. This article outlines a framework for adding an electricity capacity market in California. The new market would not create a new bureaucracy but would function within the state`s now operational PX and independent system operator (ISO) mechanisms. It would be an open market, in which capacity would be traded transparently, with freedom of entree for all willing sellers and all willing buyers.

  17. The economic effects of elevated and depressed freeways on adjacent property owners

    E-Print Network [OSTI]

    Scurry, Floyd David

    1995-01-01T23:59:59.000Z

    ABSTRACT The Economic EfFects of Elevated and Depressed Freeways on The Adjacent Property Owners. (May 1995) Floyd David Sentry, B. S. , Texas AkM University Chair of Advisory Committee: Dr. Daniel B. Fambro An econonuc assessment of a comnunity... 322, 095 283, 680 283, 680 260, 040 3, 327, 330 $5, 005, 770 Net Effect of Highway on Property Values $4, 275 139, 635 185, 310 262, 145 254, 800 271, 680 257, 840 3, 327, 330 $4, 703, 095 23 The resale of homes at all levels showed...

  18. Capacity additions ease tight methanol supply

    SciTech Connect (OSTI)

    Greek, B.F. (C and EN, Houston, TX (US))

    1988-10-03T23:59:59.000Z

    Two menthanol plants now in operation - one in the U.S., the other in Chile - will boost global supplies of methanol more than 375 million gal annually. This large capacity addition and smaller expansions in other parts of the world will exceed demand growth during 1988 and 1989, easing the squeeze on supplies. As the result of increased supplies, methanol prices could slip slightly in the fourth quarter. They are more likely to decline next year, however. The two plants, which started up in August, are owned and operated by Tenneco Oil Co. Processing and Marketing and by Cape Horn Methanol (CHM). The Tenneco plant, located in Pasadena, Tex., was restarted after a shutdown in 1982 when prices for methanol were low. It now is running at full capacity of 125 million gal per year. The plant uses the low-pressure process technology of Lurgi, reportedly requiring for feedstock and energy between 100,000 and 125,000 cu ft of methane per gallon. Global trade in methanol smooths out the supply and demand inconsistencies. Surging methanol demand in the U.S. and in Western Europe has been met by imports from areas where methanol production is most economical - that is, where natural gas is readily available and has no other application as high in value. Canada, Chile, and Trinidad are examples of those areas.

  19. Electric current locator

    DOE Patents [OSTI]

    King, Paul E. (Corvallis, OR); Woodside, Charles Rigel (Corvallis, OR)

    2012-02-07T23:59:59.000Z

    The disclosure herein provides an apparatus for location of a quantity of current vectors in an electrical device, where the current vector has a known direction and a known relative magnitude to an input current supplied to the electrical device. Mathematical constants used in Biot-Savart superposition equations are determined for the electrical device, the orientation of the apparatus, and relative magnitude of the current vector and the input current, and the apparatus utilizes magnetic field sensors oriented to a sensing plane to provide current vector location based on the solution of the Biot-Savart superposition equations. Description of required orientations between the apparatus and the electrical device are disclosed and various methods of determining the mathematical constants are presented.

  20. Optimal fault location

    E-Print Network [OSTI]

    Knezev, Maja

    2009-05-15T23:59:59.000Z

    are triggered. Protection system consisting of protection relays and circuit breakers (CBs) will operate in order to de-energize faulted line. Different Intelligent Electronic Devices (IEDs) located in substations for the purpose of monitoring... in the control center by an operator who will mark fault event in a spreadsheet and inform other staff responsible for dealing with fault analysis and repair such as protection group or maintenance respectively. Protective relaying staff will be ready...

  1. Optimal fault location

    E-Print Network [OSTI]

    Knezev, Maja

    2008-10-10T23:59:59.000Z

    are triggered. Protection system consisting of protection relays and circuit breakers (CBs) will operate in order to de-energize faulted line. Different Intelligent Electronic Devices (IEDs) located in substations for the purpose of monitoring... in the control center by an operator who will mark fault event in a spreadsheet and inform other staff responsible for dealing with fault analysis and repair such as protection group or maintenance respectively. Protective relaying staff will be ready...

  2. Alternative Fueling Station Locator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center Home PageStation LocationsGeneseeValleyPerformance

  3. Alternative Fueling Station Locator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center Home PageStation LocationsGeneseeValleyPerformance

  4. Final Exam Location and Time

    E-Print Network [OSTI]

    Final Exam Location and Time. Math 162 Fall 2001. Date: Wednesday December 12, 2001. Time: 7:00 pm -9:00 pm. Location: Lambert Fieldhouse...

  5. Final Exam Location and Time

    E-Print Network [OSTI]

    Final Exam Location and Time. Math 161 Fall 2001. Date: Friday December 14, 2001. Time: 8:00 am -10:00 am. Location: Lambert Fieldhouse...

  6. Solar PV Project Financing: Regulatory and Legislative Challenges for Third-Party PPA System Owners

    SciTech Connect (OSTI)

    Kollins, K.; Speer, B.; Cory, K.

    2009-11-01T23:59:59.000Z

    Residential and commercial end users of electricity who want to generate electricity using on-site solar photovoltaic (PV) systems face challenging initial and O&M costs. The third-party ownership power purchase agreement (PPA) finance model addresses these and other challenges. It allows developers to build and own PV systems on customers? properties and sell power back to customers. However, third-party electricity sales commonly face five regulatory challenges. The first three challenges involve legislative or regulatory definitions of electric utilities, power generation equipment, and providers of electric services. These definitions may compel third-party owners of solar PV systems to comply with regulations that may be cost prohibitive. Third-party owners face an additional challenge if they may not net meter, a practice that provides significant financial incentive to owning solar PV systems. Finally, municipalities and cooperatives worry about the regulatory implications of allowing an entity to sell electricity within their service territories. This paper summarizes these challenges, when they occur, and how they have been addressed in five states. This paper also presents alternative to the third-party ownership PPA finance model, including solar leases, contractual intermediaries, standardized contract language, federal investment tax credits, clean renewable energy bonds, and waived monopoly powers.

  7. Sandia National Laboratories: Locations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclear PressLaboratorySoftware100LifeAnnouncementsLocations

  8. Kampung Capacity Local Solutions for

    E-Print Network [OSTI]

    Kammen, Daniel M.

    utility customers. Using a hybrid energy resource optimization framework, we explore optimal configurationKampung Capacity Local Solutions for Sustainable Rural Energy in the Baram River Basin, Sarawak Energy Laboratory (RAEL) & Energy and Resources Group and Goldman School of Public Policy Release Date

  9. Data aggregation for capacity management

    E-Print Network [OSTI]

    Lee, Yong Woo

    2004-09-30T23:59:59.000Z

    This thesis presents a methodology for data aggregation for capacity management. It is assumed that there are a very large number of products manufactured in a company and that every product is stored in the database with its standard unit per hour...

  10. Audit of joint owner costing and billing practices, Naval Petroleum Reserve No. 1, Elk Hills, California

    SciTech Connect (OSTI)

    Richards, J.R.

    1986-01-13T23:59:59.000Z

    The review showed a need for the Department to revise and strengthen cash management and cost allocation procedures and practices for jointly shared Reserve operating costs funded by the Government. The procedures and practices in effect for processing Joint Owner costs, billings and collections do not permit the Government to receive full advantage of the time value of money paid in behalf of Chevron or provide for the full sharing of all costs incurred by the Government to absorb unnecessary interest and operating costs since assuming responsibility for funding Reserve operations in October 1975. It is estimated that the Department would benefit by over $3 million per year if our recommendations in these areas are fully implemented.

  11. Comparison of Capacity Value Methods for Photovoltaics in the Western United States

    SciTech Connect (OSTI)

    Madaeni, S. H.; Sioshansi, R.; Denholm, P.

    2012-07-01T23:59:59.000Z

    This report compares different capacity value estimation techniques applied to solar photovoltaics (PV). It compares more robust data and computationally intense reliability-based capacity valuation techniques to simpler approximation techniques at 14 different locations in the western United States. The capacity values at these locations are computed while holding the underlying power system characteristics fixed. This allows the effect of differences in solar availability patterns on the capacity value of PV to be directly ascertained, without differences in the power system confounding the results. Finally, it examines the effects of different PV configurations, including varying the orientation of a fixed-axis system and installing single- and double-axis tracking systems, on the capacity value. The capacity value estimations are done over an eight-year running from 1998 to 2005, and both long-term average capacity values and interannual capacity value differences (due to interannual differences in solar resource availability) are estimated. Overall, under the assumptions used in the analysis, we find that some approximation techniques can yield similar results to reliability-based methods such as effective load carrying capability.

  12. High capacity immobilized amine sorbents

    DOE Patents [OSTI]

    Gray, McMahan L. (Pittsburgh, PA); Champagne, Kenneth J. (Fredericktown, PA); Soong, Yee (Monroeville, PA); Filburn, Thomas (Granby, CT)

    2007-10-30T23:59:59.000Z

    A method is provided for making low-cost CO.sub.2 sorbents that can be used in large-scale gas-solid processes. The improved method entails treating an amine to increase the number of secondary amine groups and impregnating the amine in a porous solid support. The method increases the CO.sub.2 capture capacity and decreases the cost of utilizing an amine-enriched solid sorbent in CO.sub.2 capture systems.

  13. Pet owners have the responsibility to care for the well being of their animals. Your ability to

    E-Print Network [OSTI]

    Pet owners have the responsibility to care for the well being of their animals. Your ability to care for an animal can help determine what kind of animal you select as a pet. Out-of-Town Emergency Pamphlet, "Emergency Preparedness for Your Pets," 2003. Veterinarians in Your County or City Name

  14. Multifaceted Value Profiles of Forest Owner Categories in South Sweden: The River Helge a Catchment as a Case Study

    E-Print Network [OSTI]

    Vermont, University of

    -industrial forest land owners and municipalities included all value categories, the forest companies focused on wood including non-timber forest products as well as ecological, social, and cultural dimensions at multiple goods (e.g., timber and fish) can readily be converted into market goods. In contrast, many

  15. Channels and sources used to gather equine-related information by college-age horse owners and enthusiasts

    E-Print Network [OSTI]

    Sullivan, Erin Alene

    2009-05-15T23:59:59.000Z

    This thesis identifies the equine-related topics that are important to Texas college-age horse owners and enthusiasts and the channels/sources they use to get equine-related information. Little research has focused on this group to determine...

  16. Group Member Names: ________________________________________________ Scenario: You are the owner of a potato plant in Idaho. You have recently won a contract

    E-Print Network [OSTI]

    Provancher, William

    : ________________________________________________ ________________________________________________ ________________________________________________ Scenario: You are the owner of a potato plant in Idaho. You have recently won a contract to supply McDonald's with potatoes. McDonald's requires their suppliers to precut and freeze the potatoes before shipping to their distributing center. Your potato plant does not currently have a process for precutting and freezing potatoes

  17. The Cricket indoor location system

    E-Print Network [OSTI]

    Priyantha, Nissanka Bodhi, 1968-

    2005-01-01T23:59:59.000Z

    Indoor environments present opportunities for a rich set of location-aware applications such as navigation tools for humans and robots, interactive virtual games, resource discovery, asset tracking, location-aware sensor ...

  18. Capacity expansion in contemporary telecommunication networks

    E-Print Network [OSTI]

    Sivaraman, Raghavendran

    2007-01-01T23:59:59.000Z

    We study three capacity expansion problems in contemporary long distance telecommunication networks. The first two problems, motivated by a major long distance provider, address capacity expansion in national hybrid long ...

  19. Neural substrates of cognitive capacity limitations

    E-Print Network [OSTI]

    Buschman, Tim

    Cognition has a severely limited capacity: Adult humans can retain only about four items in mind. This limitation is fundamental to human brain function: Individual capacity is highly correlated with intelligence measures ...

  20. FURTHER EXPERIMENTS IN FISHWAY CAPACITY, 1957

    E-Print Network [OSTI]

    capacity trials 7 Maximum entry and exit 7 Entry capacity 8 Maximum number of fish present in the fishway 8 on 16 and a mean depth of 6. 3 feet. Maximum observed entry and exit of salmonids are discussed

  1. Voluntary Initiative: Partnering to Enhance Program Capacity...

    Energy Savers [EERE]

    to Enhance Program Capacity Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Voluntary Initiative: Partnering to Enhance Program...

  2. Can Science and Technology Capacity be Measured?

    E-Print Network [OSTI]

    Wagner, Caroline S; Dutta, Arindum

    2015-01-01T23:59:59.000Z

    The ability of a nation to participate in the global knowledge economy depends to some extent on its capacities in science and technology. In an effort to assess the capacity of different countries in science and technology, this article updates a classification scheme developed by RAND to measure science and technology capacity for 150 countries of the world.

  3. Competitive Electricity Markets and System Reliability: The Case for New England's Proposed Locational Capacity Market

    SciTech Connect (OSTI)

    Farr, John G.; Felder, Frank A.

    2005-10-01T23:59:59.000Z

    Clear evidence exists that the existing wholesale markets in New England are failing to provide sufficient incentives to invest. The ISO-NE LICAP proposal is designed to ensure that New England markets attract sufficient generation resources to protect reliability while being mindful of the added cost burden that it will produce.

  4. Heavier Crude, Changing Demand for Petroleum Fuels, Regional Climate Policy, and the Location of Upgrading Capacity:

    E-Print Network [OSTI]

    Reilly, John

    The crude slate is likely to become heavier in the future with greater reliance on bitumens, tar sands, heavy oils, and eventually possibly shale oil. Under standard refining processes these crude oil sources produce a ...

  5. 17 NMAC 9.592 - Location of Large Capacity Plants and Transmission Lines |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 Wind Projectsource HistorykVOpen

  6. Capacity fade of Sony 18650 cells cycled at elevated temperatures Part II. Capacity fade analysis

    E-Print Network [OSTI]

    Popov, Branko N.

    Capacity fade of Sony 18650 cells cycled at elevated temperatures Part II. Capacity fade analysis P August 2002 Abstract A complete capacity fade analysis was carried out for Sony 18650 cells cycled the other losses. # 2002 Elsevier Science B.V. All rights reserved. Keywords: Capacity fade; Sony 18650

  7. Safety Evaluation Report related to Hydrogen Control Owners Group assessment of Mark 3 containments

    SciTech Connect (OSTI)

    Li, C.Y.; Kudrick, J.A.

    1990-10-01T23:59:59.000Z

    Title 10 of the Code of Federal Regulations (10 CFR), Section 50.44 Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors,'' requires that systems be provided to control hydrogen concentration in the containment atmosphere following an accident to ensure that containment integrity is maintained. The purpose of this report is to provide regulatory guidance to licensees with Mark III containments with regard to demonstrating compliance with 10 CFR 50.44, Section (c)(3)(vi) and (c)(3)(vii). In this report, the staff provides its evaluation of the generic methodology proposed by the Hydrogen Control Owners Group. This generic methodology is documented in Topical Report HGN-112-NP, Generic Hydrogen Control Information for BWR/6 Mark III Containments.'' In addition, the staff has recommended that the vulnerability to interruption of power to the hydrogen igniters be evaluated further on a plant-specific basis as part of the individual plant examination of the plants with Mark III containments. 10 figs., 1 tab.

  8. Mobile Alternative Fueling Station Locator

    SciTech Connect (OSTI)

    Not Available

    2009-04-01T23:59:59.000Z

    The Department of Energy's Alternative Fueling Station Locator is available on-the-go via cell phones, BlackBerrys, or other personal handheld devices. The mobile locator allows users to find the five closest biodiesel, electricity, E85, hydrogen, natural gas, and propane fueling sites using Google technology.

  9. Precision zero-home locator

    DOE Patents [OSTI]

    Stone, W.J.

    1983-10-31T23:59:59.000Z

    A zero-home locator includes a fixed phototransistor switch and a moveable actuator including two symmetrical, opposed wedges, each wedge defining a point at which switching occurs. The zero-home location is the average of the positions of the points defined by the wedges.

  10. Faced with rising fuel costs, building and home owners are looking for energy-efficient solutions. Improving the building envelope (roof or attic system, walls,

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    and envelope assemblies for use in new construction and retrofits. Patrick Hughes Director, Building better understanding of product performance by the entire construction materials industry. INNOVATIONSFaced with rising fuel costs, building and home owners are looking for energy- efficient solutions

  11. Text-Alternative Version: The L Prize-Winning LED A19 ReplacementWhat Commercial Building Owners/Operators Can Expect in 2012

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "The L Prize-Winning LED A19 ReplacementWhat Commercial Building Owners/Operators Can Expect in 2012" webcast, held January 18, 2012.

  12. Legislating the rights of private property owners: a review and analysis of actions in the 103rd and 104th Congresses

    E-Print Network [OSTI]

    Kerby, Hannah Elizabeth

    1995-01-01T23:59:59.000Z

    LEGISLATING THE RIGHTS OF PRIVATE PROPERTY OWNERS: A REVIEW AND ANALYSIS OF ACTIONS IN THE 103RD AND 104TH CONGRESSES A Professional Paper by Hannah Elizabeth Kerby Approved as to style and content by: hairman, Advisory Committee Committee... Member Committee Member August 1995 Record of Study LEGISLATING THE RIGHTS OF PRIVATE PROPERTY OWNERS: A REVIEW AND ANALYSIS OF ACTIONS IN THE 103RD AND 104TH CONGRESSES A PROFESSIONAL PAPER by Hannah Elizabeth Kerby Submitted to the College...

  13. Solar Energy and Capacity Value (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-09-01T23:59:59.000Z

    This is a one-page, two-sided fact sheet on the capacity of solar power to provide value to utilities and power system operators.

  14. Increasing water holding capacity for irrigation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Increasing water holding capacity for irrigation Reseachers recommend solutions for sediment trapping in irrigation system LANL and SNL leveraged technical expertise to determine...

  15. Worldwide Energy Efficiency Action through Capacity Building...

    Open Energy Info (EERE)

    and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide Energy Efficiency Action...

  16. Quantum Capacities of Channels with small Environment

    E-Print Network [OSTI]

    Michael M. Wolf; David Perez-Garcia

    2006-07-11T23:59:59.000Z

    We investigate the quantum capacity of noisy quantum channels which can be represented by coupling a system to an effectively small environment. A capacity formula is derived for all cases where both system and environment are two-dimensional--including all extremal qubit channels. Similarly, for channels acting on higher dimensional systems we show that the capacity can be determined if the channel arises from a sufficiently small coupling to a qubit environment. Extensions to instances of channels with larger environment are provided and it is shown that bounds on the capacity with unconstrained environment can be obtained from decompositions into channels with small environment.

  17. Resources for Pet, Poultry and Livestock Owners Affected by Natural Disasters

    E-Print Network [OSTI]

    Faries Jr., Floron C.

    2008-09-02T23:59:59.000Z

    This publication lists agencies and other organizations that can help locate missing pets and livestock, assist with carcass disposal, provide animal feed, and help in other ways after a disaster. There are phone numbers and Web addresses for each...

  18. The NU Transportation Center Icarus Society presents.... "Airline Capacity Discipline: Where and

    E-Print Network [OSTI]

    Bustamante, Fabián E.

    The NU Transportation Center Icarus Society presents.... "Airline Capacity Discipline: Where and to What Extent? Aaron J. Gellman Professor of Transportation Northwestern University Transportation Center and Kellogg School of Management Thursday Nov. 29, 2012 3:00 pm Location: Transportation Center Chambers Hall

  19. North Dakota Refining Capacity Study

    SciTech Connect (OSTI)

    Dennis Hill; Kurt Swenson; Carl Tuura; Jim Simon; Robert Vermette; Gilberto Marcha; Steve Kelly; David Wells; Ed Palmer; Kuo Yu; Tram Nguyen; Juliam Migliavacca

    2011-01-05T23:59:59.000Z

    According to a 2008 report issued by the United States Geological Survey, North Dakota and Montana have an estimated 3.0 to 4.3 billion barrels of undiscovered, technically recoverable oil in an area known as the Bakken Formation. With the size and remoteness of the discovery, the question became 'can a business case be made for increasing refining capacity in North Dakota?' And, if so what is the impact to existing players in the region. To answer the question, a study committee comprised of leaders in the region's petroleum industry were brought together to define the scope of the study, hire a consulting firm and oversee the study. The study committee met frequently to provide input on the findings and modify the course of the study, as needed. The study concluded that the Petroleum Area Defense District II (PADD II) has an oversupply of gasoline. With that in mind, a niche market, naphtha, was identified. Naphtha is used as a diluent used for pipelining the bitumen (heavy crude) from Canada to crude markets. The study predicted there will continue to be an increase in the demand for naphtha through 2030. The study estimated the optimal configuration for the refinery at 34,000 barrels per day (BPD) producing 15,000 BPD of naphtha and a 52 percent refinery charge for jet and diesel yield. The financial modeling assumed the sponsor of a refinery would invest its own capital to pay for construction costs. With this assumption, the internal rate of return is 9.2 percent which is not sufficient to attract traditional investment given the risk factor of the project. With that in mind, those interested in pursuing this niche market will need to identify incentives to improve the rate of return.

  20. Managing nuclear predominant generating capacity

    SciTech Connect (OSTI)

    Bouget, Y.H.; Herbin, H.C.; Carbonnier, D.

    1998-07-01T23:59:59.000Z

    The most common belief, associated with nuclear power plant, leads to the conclusion that it can only operate, as a base load plant. This observation can be reversed, by just looking at large generating capacity, using an important nuclear generation mix. Nuclear plants may certainly load follow and contribute to the grid frequency control. The French example illustrates these possibilities. The reactor control of French units has been customized to accommodate the grid requests. Managing such a large nuclear plant fleet requires various actions be taken, ranging from a daily to a multi-annual perspective. The paper describes the various contributions leading to safe, reliable, well accepted and cost competitive nuclear plants in France. The combination of all aspects related to operations, maintenance scheduling, nuclear safety management, are presented. The use of PWR units carries considerable weight in economic terms, with several hundred million francs tied in with outage scheduling every year. This necessitates a global view of the entire generating system which can be mobilized to meet demand. There is considerable interaction between units as, on the one hand, they are competing to satisfy the same need, and, on the other hand, reducing maintenance costs means sharing the necessary resources, and thus a coordinated staggering of outages. In addition, nuclear fuel is an energy reserve which remains in the reactor for 3 or 4 years, with some of the fuel renewed each year. Due to the memory effect, the fuel retains a memory of past use, so that today's choices impact upon the future. A medium-term view of fuel management is also necessary.

  1. Mitochondrial Respiratory Capacity Is a Critical Regulator

    E-Print Network [OSTI]

    respiratory capacity (SRC). SRC is the extra capacity available in cells to produce energy in response. In response to antigen (Ag) and costimulation, CD8+ T cells undergo a developmental program characterized- ating in response to Ag, it is thought that quiescent T cells (e.g., naive and memory T cells), like

  2. REDUCTION CAPACITY OF SALTSTONE AND SALTSTONE COMPONENTS

    SciTech Connect (OSTI)

    Roberts, K.; Kaplan, D.

    2009-11-30T23:59:59.000Z

    The duration that saltstone retains its ability to immobilize some key radionuclides, such as technetium (Tc), plutonium (Pu), and neptunium (Np), depends on its capacity to maintain a low redox status (or low oxidation state). The reduction capacity is a measure of the mass of reductants present in the saltstone; the reductants are the active ingredients that immobilize Tc, Pu, and Np. Once reductants are exhausted, the saltstone loses its ability to immobilize these radionuclides. The reduction capacity values reported here are based on the Ce(IV)/Fe(II) system. The Portland cement (198 {micro}eq/g) and especially the fly ash (299 {micro}eq/g) had a measurable amount of reduction capacity, but the blast furnace slag (820 {micro}eq/g) not surprisingly accounted for most of the reduction capacity. The blast furnace slag contains ferrous iron and sulfides which are strong reducing and precipitating species for a large number of solids. Three saltstone samples containing 45% slag or one sample containing 90% slag had essentially the same reduction capacity as pure slag. There appears to be some critical concentration between 10% and 45% slag in the Saltstone formulation that is needed to create the maximum reduction capacity. Values from this work supported those previously reported, namely that the reduction capacity of SRS saltstone is about 820 {micro}eq/g; this value is recommended for estimating the longevity that the Saltstone Disposal Facility will retain its ability to immobilize radionuclides.

  3. Guide to Combined Heat and Power Systems for Boiler Owners and Operators

    SciTech Connect (OSTI)

    Oland, CB

    2004-08-19T23:59:59.000Z

    Combined heat and power (CHP) or cogeneration is the sequential production of two forms of useful energy from a single fuel source. In most CHP applications, chemical energy in fuel is converted to both mechanical and thermal energy. The mechanical energy is generally used to generate electricity, while the thermal energy or heat is used to produce steam, hot water, or hot air. Depending on the application, CHP is referred to by various names including Building Cooling, Heating, and Power (BCHP); Cooling, Heating, and Power for Buildings (CHPB); Combined Cooling, Heating, and Power (CCHP); Integrated Energy Systems (IES), or Distributed Energy Resources (DER). The principal technical advantage of a CHP system is its ability to extract more useful energy from fuel compared to traditional energy systems such as conventional power plants that only generate electricity and industrial boiler systems that only produce steam or hot water for process applications. By using fuel energy for both power and heat production, CHP systems can be very energy efficient and have the potential to produce electricity below the price charged by the local power provider. Another important incentive for applying cogeneration technology is to reduce or eliminate dependency on the electrical grid. For some industrial processes, the consequences of losing power for even a short period of time are unacceptable. The primary objective of the guide is to present information needed to evaluate the viability of cogeneration for new or existing industrial, commercial, and institutional (ICI) boiler installations and to make informed CHP equipment selection decisions. Information presented is meant to help boiler owners and operators understand the potential benefits derived from implementing a CHP project and recognize opportunities for successful application of cogeneration technology. Topics covered in the guide follow: (1) an overview of cogeneration technology with discussions about benefits of applying cogeneration technology and barriers to implementing cogeneration technology; (2) applicable federal regulations and permitting issues; (3) descriptions of prime movers commonly used in CHP applications, including discussions about design characteristics, heat-recovery options and equipment, fuels and emissions, efficiency, maintenance, availability, and capital cost; (4) electrical generators and electrical interconnection equipment; (5) cooling and dehumidification equipment; (6) thermodynamic cycle options and configurations; (7) steps for evaluating the technical and economic feasibility of applying cogeneration technology; and (8) information sources.

  4. Synchronized sampling improves fault location

    SciTech Connect (OSTI)

    Kezunovic, M. [Texas A and M Univ., College Station, TX (United States)] [Texas A and M Univ., College Station, TX (United States); Perunicic, B. [Lamar Univ., Beaumont, TX (United States)] [Lamar Univ., Beaumont, TX (United States)

    1995-04-01T23:59:59.000Z

    Transmission line faults must be located accurately to allow maintenance crews to arrive at the scene and repair the faulted section as soon as possible. Rugged terrain and geographical layout cause some sections of power transmission lines to be difficult to reach. In the past, a variety of fault location algorithms were introduced as either an add-on feature in protective relays or stand-alone implementation in fault locators. In both cases, the measurements of current and voltages were taken at one terminal of a transmission line only. Under such conditions, it may become difficult to determine the fault location accurately, since data from other transmission line ends are required for more precise computations. In the absence of data from the other end, existing algorithms have accuracy problems under several circumstances, such as varying switching and loading conditions, fault infeed from the other end, and random value of fault resistance. Most of the one-end algorithms were based on estimation of voltage and current phasors. The need to estimate phasors introduces additional difficulty in high-speed tripping situations where the algorithms may not be fast enough in determining fault location accurately before the current signals disappear due to the relay operation and breaker opening. This article introduces a unique concept of high-speed fault location that can be implemented either as a simple add-on to the digital fault recorders (DFRs) or as a stand-alone new relaying function. This advanced concept is based on the use of voltage and current samples that are synchronously taken at both ends of a transmission line. This sampling technique can be made readily available in some new DFR designs incorporating receivers for accurate sampling clock synchronization using the satellite Global Positioning System (GPS).

  5. Are owners' reports of their dogs guilty look influenced by the dogs action and evidence of the misdeed?

    E-Print Network [OSTI]

    Ostoji?, Ljerka; Tkal?i?, Mladenka; Clayton, Nicola S.

    2015-01-03T23:59:59.000Z

    dogs greeting behaviours were not a Thus, our findings do not support th concurrent negative reaction by their 2015 The Authors. Published bylocate /behavproc uenced by the dogs nija 4, 51000 Rijeka Croatia eeting behaviour after having performed a... dogs that have eaten the r whom the food was not replaced by the experimenter lude that their dog had performed the misdeed. ls and methods s ix owners and their dogs were tested in Croatia from 011 to January 2012 and from June to October 2013 (see...

  6. Location logistics of industrial facilities

    E-Print Network [OSTI]

    Hammack, William Eugene

    1981-01-01T23:59:59.000Z

    of company intent1ons is not made at the correct time and in the correct manner. 6. Recommend Best Areas for Further Invest1 ations. Once the on-site evaluations have been completed, the 11st of possibilities is reduced still further and only the best... location and site selection. This data was gathered through library research, atten- dance of various industr1al development conferences, sol1citation of mater1als from individuals currently involved with industrial facil1ties location, and various...

  7. Representation of the Solar Capacity Value in the ReEDS Capacity Expansion Model: Preprint

    SciTech Connect (OSTI)

    Sigrin, B.; Sullivan, P.; Ibanez, E.; Margolis, R.

    2014-08-01T23:59:59.000Z

    An important emerging issue is the estimation of renewables' contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to resource variability. Reliability-based methods, particularly, effective load-carrying capacity (ELCC), are considered to be the most robust techniques for addressing this resource variability. The Regional Energy Deployment System (ReEDS) capacity expansion model and other long-term electricity capacity planning models require an approach to estimating CV for generalized PV and system configurations with low computational and data requirements. In this paper we validate treatment of solar photovoltaic (PV) capacity value by ReEDS capacity expansion model by comparing model results to literature for a range of energy penetration levels. Results from the ReEDS model are found to compare well with both comparisons--despite not being resolved at an hourly scale.

  8. Photovoltaics effective capacity: Interim final report 2

    SciTech Connect (OSTI)

    Perez, R.; Seals, R. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1997-11-01T23:59:59.000Z

    The authors provide solid evidence, based on more than 8 million data points, that regional photovoltaic (PV) effective capacity is largely unrelated to the region`s solar resource. They confirm, however, that effective capacity is strongly related to load-shape characteristics. The load-shape effective-capacity relationship appears to be valid for end-use loads as small as 100 kW, except possibly in the case of electrically heated buildings. This relationship was used as a tool to produce a US map of PV`s effective capacity. The regions of highest effective capacities include (1) the central US from the northern Great Plains to the metropolitan areas of Chicago and Detroit, down to the lower Mississippi Valley, (2) California and western Arizona, and (3) the northeast metropolitan corridor. The features of this map are considerably different from the traditional solar resource maps. They tend to reflect the socio-economic and climatic factors that indirectly drive PV`s effective capacity: e.g., commercial air-conditioning, little use of electric heat, and strong summer heat waves. The map provides a new and significant insight to a comprehensive valuation of the PV resource. The authors assembled preliminary evidence showing that end-use load type may be related to PV`s effective capacity. Highest effective capacities were found for (nonelectrically heated) office buildings, followed by hospitals. Lowest capacities were found for airports and residences. Many more data points are needed, however, to ascertain and characterize these preliminary findings.

  9. Acceptance Priority Ranking & Annual Capacity Report

    SciTech Connect (OSTI)

    none,

    2004-07-31T23:59:59.000Z

    The Nuclear Waste Policy Act of 1982, as amended (the Act), assigns the Federal Government the responsibility for the disposal of spent nuclear fuel and high-level waste. Section 302(a) of the Act authorizes the Secretary to enter into contracts with the owners and generators of commercial spent nuclear fuel and/or high-level waste. The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) established the contractual mechanism for the Department's acceptance and disposal of spent nuclear fuel and high-level waste. It includes the requirements and operational responsibilities of the parties to the Standard Contract in the areas of administrative matters, fees, terms of payment, waste acceptance criteria, and waste acceptance procedures. The Standard Contract provides for the acquisition of title to the spent nuclear fuel and/or high-level waste by the Department, its transportation to Federal facilities, and its subsequent disposal.

  10. Building Address Locations -Assumes entire

    E-Print Network [OSTI]

    Guenther, Frank

    Building Address Locations - Assumes entire building unless noted Designation Submit through* 560, 4 BU Crosstown Center 801 Massachusetts Ave Floor 1, 2 BMC BCD Building 800 Harrison Avenue BCD BMC Biosquare III 670 Albany Floors 2, 3, 6, 7 BMC Biosquare III 670 Albany Floors 1, 4, 5, 8 BU Building

  11. Boston, Massachusetts Location: Boston, MA

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    -recovery ventilation and water-source heat pumps Each unit has fresh air ducted independently. Each residence is warmed by a heat pump that taps the Trigen Energy Corporation steam lines that run underneath the street. #12;WallsBoston, Massachusetts #12;Location: Boston, MA Building type(s): Multi-unit residential, Retail 350

  12. Feedback Capacity of the Compound Channel

    E-Print Network [OSTI]

    Shrader, Brooke E.

    In this work, we find the capacity of a compound finite-state channel (FSC) with time-invariant deterministic feedback. We consider the use of fixed length block codes over the compound channel. Our achievability result ...

  13. Inventories and capacity utilization in general equilibrium

    E-Print Network [OSTI]

    Trupkin, Danilo Rogelio

    2009-05-15T23:59:59.000Z

    The primary goal of this dissertation is to gain a better understanding, in thecontext of a dynamic stochastic general equilibrium framework, of the role of inventories and capacity utilization (of both capital and labor) and, in particular...

  14. Expandability, reversibility, and optimal capacity choice

    E-Print Network [OSTI]

    Dixit, Avinash K.

    1997-01-01T23:59:59.000Z

    We develop continuous-time models of capacity choice when demand fluctuates stochastically, and the firm's opportunities to expand or contract are limited. Specifically, we consider costs of investing or disinvesting that ...

  15. Developing High Capacity, Long Life Anodes

    Broader source: Energy.gov (indexed) [DOE]

    more than 1000 mAhg with poor cyleability. * The formation of Sn x Co y C z and MO composite could lead to the increase in the capacity, reduce the amount of cobalt in the...

  16. California: Conducting Polymer Binder Boosts Storage Capacity...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - 10:17am Addthis Working with Nextval, Inc., Lawrence Berkeley National Laboratory (LBNL) developed a Conducting Polymer Binder for high-capacity lithium-ion batteries. With a...

  17. Capacity Building Project with Howard University

    Broader source: Energy.gov [DOE]

    The purpose of this initiative is to build community capacity for public participation in environmental and energy decision making. The target communities are those impacted by U.S. Department of...

  18. Measuring the capacity impacts of demand response

    SciTech Connect (OSTI)

    Earle, Robert; Kahn, Edward P.; Macan, Edo

    2009-07-15T23:59:59.000Z

    Critical peak pricing and peak time rebate programs offer benefits by increasing system reliability, and therefore, reducing capacity needs of the electric power system. These benefits, however, decrease substantially as the size of the programs grows relative to the system size. More flexible schemes for deployment of demand response can help address the decreasing returns to scale in capacity value, but more flexible demand response has decreasing returns to scale as well. (author)

  19. Static internal pressure capacity of Hanford Single-Shell Waste Tanks

    SciTech Connect (OSTI)

    Julyk, L.J.

    1994-07-19T23:59:59.000Z

    Underground single-shell waste storage tanks located at the Hanford Site in Richland, Washington, generate gaseous mixtures that could be ignited, challenging the structural integrity of the tanks. The structural capacity of the single-shell tanks to internal pressure is estimated through nonlinear finite-element structural analyses of the reinforced concrete tank. To determine their internal pressure capacity, designs for both the million-gallon and the half-million-gallon tank are evaluated on the basis of gross structural instability.

  20. Where is the ideal location for a US East Coast offshore grid? Michael J. Dvorak,1

    E-Print Network [OSTI]

    weather model data from 20062010 were used to approximate wind farm output. The offshore grid was located%, and the combined capacity factor was 48% (gross). By interconnecting offshore wind energy farms 450 km apart of no and full-power events. Offshore grids to connect offshore wind energy (OWE) farms have been proposed

  1. Assessment of Wind/Solar Co-located Generation in Texas

    SciTech Connect (OSTI)

    Steven M. Wiese

    2009-07-20T23:59:59.000Z

    This paper evaluates the opportunity to load co-located wind and solar generation capacity onto a constrained transmission system while engendering only minimal losses. It quantifies the economic and energy opportunities and costs associated with pursuing this strategy in two Texas locations ?¢???? one in west Texas and the other in south Texas. The study builds upon previous work published by the American Solar Energy Society (ASES) which illuminated the potential benefits of negative correlation of wind and solar generation in some locations by quantifying the economic and energy losses which would arise from deployment of solar generation in areas with existing wind generation and constrained transmission capacity. Clean Energy Associates (CEA) obtained and incorporated wind and solar resource data and the Electric Reliability Council of Texas (ERCOT)) load and price data into a model which evaluates varying levels of solar thermal, solar photovoltaic (PV) and wind capacity against an assumed transmission capacity limit at each of the two locations.

  2. Joint microseismic event location with uncertain velocity

    E-Print Network [OSTI]

    Poliannikov, Oleg V.

    2013-01-01T23:59:59.000Z

    We study the problem of the joint location of seismic events using an array of receivers. We show that locating multiple seismic events simultaneously is advantageous compared to the more traditional approaches of locating ...

  3. Energy Department Launches Alternative Fueling Station Locator...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App November 7, 2013 - 11:16am Addthis As part of...

  4. Asymptotic analysis of an optimal location problem

    E-Print Network [OSTI]

    2003-05-13T23:59:59.000Z

    Asymptotic analysis of an optimal location problem. One considers the problem of optimal location of masses(say production centers) in order to approximate a...

  5. Abstract--This paper addresses the problem of interaction between short run and long run locational signals and the coordination between generation investments and lumpy transmission

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . The short run locational signals we evaluate are sent by nodal pricing and the long run ones are sent-known marginal pricing to expand both generation and transmission capacity (Crew et al., 1995; Stoft, 2006). One the marginal transmission capacity cost with marginal congestion cost. Nodal pricing as market-based pricing

  6. High-capacity hydrogen storage in lithium and sodium amidoboranes...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    capacity hydrogen storage in lithium and sodium amidoboranes. High-capacity hydrogen storage in lithium and sodium amidoboranes. Abstract: A substantial effort worldwide has been...

  7. Solid-State Hydrogen Storage: Storage Capacity,Thermodynamics...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Storage: Storage Capacity,Thermodynamics and Kinetics. Solid-State Hydrogen Storage: Storage Capacity,Thermodynamics and Kinetics. Abstract: Solid-state reversible...

  8. Is there life in other markets? BPA explores preschedule capacity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    can diminish the federal hydropower system's capacity to balance supply and demand for power. The process allowed BPA to explore an untested capacity market this spring to acquire...

  9. Modeling-Thermo-electrochemistry, Capacity Degradation and Mechanics...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Modeling-Thermo-electrochemistry, Capacity Degradation and Mechanics with SEI Layer Modeling-Thermo-electrochemistry, Capacity Degradation and Mechanics with SEI Layer 2011 DOE...

  10. RULES FOR CONGESTION MANAGEMENT EVALUATION OF AVAILABILITY OF CAPACITY AND

    E-Print Network [OSTI]

    RULES FOR CONGESTION MANAGEMENT EVALUATION OF AVAILABILITY OF CAPACITY AND POSSIBILITIES.............................................................12 4.4 Available trading capacity in the market

  11. HT Combinatorial Screening of Novel Materials for High Capacity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HT Combinatorial Screening of Novel Materials for High Capacity Hydrogen Storage HT Combinatorial Screening of Novel Materials for High Capacity Hydrogen Storage Presentation for...

  12. Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15eswise2012p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

  13. Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15eswise2011p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

  14. Employee-Driven Initiative Increases Treatment Capacity, Reduces...

    Energy Savers [EERE]

    Employee-Driven Initiative Increases Treatment Capacity, Reduces Clean Water Demands Employee-Driven Initiative Increases Treatment Capacity, Reduces Clean Water Demands June 30,...

  15. Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

    Office of Environmental Management (EM)

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the...

  16. Transmission Benefits of Co-Locating Concentrating Solar Power and Wind

    SciTech Connect (OSTI)

    Sioshansi, R.; Denholm, P.

    2012-03-01T23:59:59.000Z

    In some areas of the U.S. transmission constraints are a limiting factor in deploying new wind and concentrating solar power (CSP) plants. Texas is an example of one such location, where the best wind and solar resources are in the western part of the state, while major demand centers are in the east. The low capacity factor of wind is a compounding factor, increasing the relative cost of new transmission per unit of energy actually delivered. A possible method of increasing the utilization of new transmission is to co-locate both wind and concentrating solar power with thermal energy storage. In this work we examine the benefits and limits of using the dispatachability of thermal storage to increase the capacity factor of new transmission developed to access high quality solar and wind resources in remote locations.

  17. Representation of Solar Capacity Value in the ReEDS Capacity Expansion Model

    SciTech Connect (OSTI)

    Sigrin, B.; Sullivan, P.; Ibanez, E.; Margolis, R.

    2014-03-01T23:59:59.000Z

    An important issue for electricity system operators is the estimation of renewables' capacity contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to the resource variability. Reliability-based methods, particularly assessment of the Effective Load-Carrying Capacity, are considered to be the most robust and widely-accepted techniques for addressing this resource variability. This report compares estimates of solar PV capacity value by the Regional Energy Deployment System (ReEDS) capacity expansion model against two sources. The first comparison is against values published by utilities or other entities for known electrical systems at existing solar penetration levels. The second comparison is against a time-series ELCC simulation tool for high renewable penetration scenarios in the Western Interconnection. Results from the ReEDS model are found to compare well with both comparisons, despite being resolved at a super-hourly temporal resolution. Two results are relevant for other capacity-based models that use a super-hourly resolution to model solar capacity value. First, solar capacity value should not be parameterized as a static value, but must decay with increasing penetration. This is because -- for an afternoon-peaking system -- as solar penetration increases, the system's peak net load shifts to later in the day -- when solar output is lower. Second, long-term planning models should determine system adequacy requirements in each time period in order to approximate LOLP calculations. Within the ReEDS model we resolve these issues by using a capacity value estimate that varies by time-slice. Within each time period the net load and shadow price on ReEDS's planning reserve constraint signals the relative importance of additional firm capacity.

  18. DOE mixed waste treatment capacity analysis

    SciTech Connect (OSTI)

    Ross, W.A.; Wehrman, R.R.; Young, J.R.; Shaver, S.R.

    1994-06-01T23:59:59.000Z

    This initial DOE-wide analysis compares the reported national capacity for treatment of mixed wastes with the calculated need for treatment capacity based on both a full treatment of mixed low-level and transuranic wastes to the Land Disposal Restrictions and on treatment of transuranic wastes to the WIPP waste acceptance criteria. The status of treatment capacity is reported based on a fifty-element matrix of radiation-handling requirements and functional treatment technology categories. The report defines the classifications for the assessment, describes the models used for the calculations, provides results from the analysis, and includes appendices of the waste treatment facilities data and the waste stream data used in the analysis.

  19. Heat capacity at the glass transition

    E-Print Network [OSTI]

    Kostya Trachenko; Vadim Brazhkin

    2010-07-13T23:59:59.000Z

    A fundamental problem of glass transition is to explain the jump of heat capacity at the glass transition temperature $T_g$ without asserting the existence of a distinct solid glass phase. This problem is also common to other disordered systems, including spin glasses. We propose that if $T_g$ is defined as the temperature at which the liquid stops relaxing at the experimental time scale, the jump of heat capacity at $T_g$ follows as a necessary consequence due to the change of system's elastic, vibrational and thermal properties. In this picture, we discuss time-dependent effects of glass transition, and identify three distinct regimes of relaxation. Our approach explains widely observed logarithmic increase of $T_g$ with the quench rate and the correlation of heat capacity jump with liquid fragility.

  20. Short range radio locator system

    DOE Patents [OSTI]

    McEwan, Thomas E. (Livermore, CA)

    1996-01-01T23:59:59.000Z

    A radio location system comprises a wireless transmitter that outputs two megahertz period bursts of two gigahertz radar carrier signals. A receiver system determines the position of the transmitter by the relative arrival of the radar bursts at several component receivers set up to have a favorable geometry and each one having a known location. One receiver provides a synchronizing gating pulse to itself and all the other receivers to sample the ether for the radar pulse. The rate of the synchronizing gating pulse is slightly offset from the rate of the radar bursts themselves, so that each sample collects one finely-detailed piece of information about the time-of-flight of the radar pulse to each receiver each pulse period. Thousands of sequential pulse periods provide corresponding thousand of pieces of information about the time-of-flight of the radar pulse to each receiver, in expanded, not real time. Therefore the signal processing can be done with relatively low-frequency, inexpensive components. A conventional microcomputer is then used to find the position of the transmitter by geometric triangulation based on the relative time-of-flight information.

  1. A study of freeway capacity in Texas

    E-Print Network [OSTI]

    Ringert, John Franklin

    1992-01-01T23:59:59.000Z

    studies have been undertaken to determine the value of capacity. A study by Hurdle and Datta in 1983 concluded that the value of 2, 000 pcphpl was still a good estimate of capacity (5). In contrast, a study by Agyemang-Duah (6) concluded...). Many other studies have attempted to measure the flows in both conditions and have produced varying results. Another related issue is the requirement for the existence of sufficient demand which is highlighted by McShane and Roess (13). Agyemang-Duah...

  2. Faced with rising fuel costs, building and home owners are looking for energy-efficient solutions. Improving the building envelope (roof or attic system, walls,

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    and envelope assemblies for use in new construction and retrofits. Patrick Hughes Director, Building materials industry. INNOVATIONS IN BUILDINGS Contact ORNL 2012-G00695/tcc Ensuring Affordable, EfficientFaced with rising fuel costs, building and home owners are looking for energy- efficient solutions

  3. KUALI TIPS FOR CAPITAL ASSETS NEW OBJECT CODES: These are based upon the Funding Source Code. Owner Field shows Title now.

    E-Print Network [OSTI]

    KUALI TIPS FOR CAPITAL ASSETS NEW OBJECT CODES: These are based upon the Funding Source Code. Owner Field shows Title now. Decal # Historical Sub Code New Object Code Description Comments OBJECT CODES: To determine which Object Code you should use, you will need to look up the Account Fund

  4. KUALI TIPS FOR CAPITAL ASSETS NEW OBJECT CODES: These are based upon Funding Source vs. Title. Owner Field shows Title now.

    E-Print Network [OSTI]

    KUALI TIPS FOR CAPITAL ASSETS NEW OBJECT CODES: These are based upon Funding Source vs. Title. Owner Field shows Title now. Decal # Historical Sub Code New Object Code Description 3 8210 8210 CSU) and 8247 (Federal Loaned) are Property Use Only. HOW TO USE THE NEW OBJECT CODES: To determine which Object

  5. The Guaranteed Maximum Price proposal is developed at the phase specified in the Agreement Between Owner and Construction Manager, usually at 50% Construction Documents.

    E-Print Network [OSTI]

    Sura, Philip

    Owner and Construction Manager, usually at 50% Construction Documents. The GMP proposal should be bound general summary of scope of work, alternates, etc.) Tab 2 List of documents (project manual(s), drawings summary of the work, the construction manager's fee (as identified in Paragraph 7.2 of the Agreement) must

  6. STATE OF CALIFORNIA MAXIMUM RATED TOTAL COOLING CAPACITY

    E-Print Network [OSTI]

    that the installed space conditioning system must have a cooling capacity rating at ARI conditions that is equal Total Cooling Capacity of the installed system (Btu/hr) 3b Sum of the ARI Rated Total Cooling Capacities, then the sum of ARI Rated Cooling Capacities of the installed cooling systems must be calculated and entered

  7. TURKEY'S CIVILIAN CAPACITY IN POST-CONFLICT RECONSTRUCTION

    E-Print Network [OSTI]

    Yanikoglu, Berrin

    TURKEY'S CIVILIAN CAPACITY IN POST-CONFLICT RECONSTRUCTION 1 TURKEY'S CIVILIAN CAPACITY IN POST-CONFLICT RECONSTRUCTION by Teri Murphy & Onur Sazak #12;Turkey's Civilian Capacity in post-Conflict Reconstruction By Teri-checking was indispensable for the realization of this project. #12;TURKEY'S CIVILIAN CAPACITY IN POST

  8. PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY

    E-Print Network [OSTI]

    California at Davis, University of

    - nently reduce the connected capacity, with respect to the HVAC system, by disconnecting compressors within RTUs that contain multiple compressors. We reviewed existing literature and col- lected primary data by conducting field surveys in order to estab- lish how multiple compressor RTUs are typically

  9. Electricity market module: Electricity capacity planning submodule

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    The purpose of this report is to describe modifications to the Electricity Capacity Planning Submodule (ECP) for the Annual Energy Outlook 1996. It describes revisions to enhance the representation of planned maintenance, incorporate technological improvements in operating efficiencies, revise the algorithm for determining international firm power imports, and include risk premiums for new plant construction.

  10. Multivariable controller increased MTBE complex capacity

    SciTech Connect (OSTI)

    Robertson, D.; Peterson, T.J.; O`Connor, D. [DMC Corp., Houston, TX (United States); Payne, D.; Adams, V. [Valero Refining Co., Corpus Christi, TX (United States)

    1997-03-01T23:59:59.000Z

    Capacity increased by more than 4.6% when one dynamic matrix multivariable controller began operating in Valero Refining Company`s MTBE production complex in Corpus Christi, Texas. This was on a plant that was already running well above design capacity due to previously made process changes. A single controller was developed to cover an isobutane dehydrogenation (ID) unit and an MTBE reaction and fractionation plant with the intermediate isobutylene surge drum. The overall benefit is realized by a comprehensive constrained multivariable predictive controller that properly handles all sets of limits experienced by the complex, whether limited by the front-end ID or back-end MTBE units. The controller has 20 manipulated, 6 disturbance and 44 controlled variables, and covers widely varying dynamics with settling times ranging from twenty minutes to six hours. The controller executes each minute with a six hour time horizon. A unique achievement is intelligent surge drum level handling by the controller for higher average daily complex capacity as a whole. The ID unit often operates at simultaneous limits on reactor effluent compressor capacity, cold box temperature and hydrogen/hydrocarbon ratio, and the MTBE unit at impurity in butene column overhead as well as impurity in MTBE product. The paper discusses ether production, isobutane dehydrogenation, maximizing production, controller design, and controller performance.

  11. STORAGE CAPACITY ALLOCATION ALGORITHMS FOR HIERARCHICAL

    E-Print Network [OSTI]

    Stavrakakis, Ioannis

    STORAGE CAPACITY ALLOCATION ALGORITHMS FOR HIERARCHICAL CONTENT DISTRIBUTION Nikolaos Laoutaris of Athens, 15784 Athens, Greece {laoutaris,vassilis,istavrak}@di.uoa.gr Abstract The addition of storage storage budget to the nodes of a hierarchical con- tent distribution system is formulated; optimal

  12. CSEM WP 124 Capacity Markets for Electricity

    E-Print Network [OSTI]

    California at Berkeley. University of

    CSEM WP 124 Capacity Markets for Electricity Anna Creti, LEEERNA, University of Toulouse for Electricity Anna Creti LEEERNA, University of Toulouse Natalia Fabra Universidad Carlos III de Madrid February 2004 Abstract The creation of electricity markets has raised the fundamental question as to whether

  13. Kampung Capacity Local Solutions for Sustainable

    E-Print Network [OSTI]

    Kammen, Daniel M.

    Kampung Capacity Local Solutions for Sustainable Rural Energy in the Baram River Basin, Sarawak and social opportunities of up to 1.5 billion people worldwide. As a critical case in point, most rural of service provision based on large-scale regional electrification. A range of different renewable energy

  14. Capacity Building in Wind Energy for PICs

    E-Print Network [OSTI]

    indicates that significant wind energy potential exists. · A monitoring project showed that in Rarotonga system. · About 30 other islands could have potential for grid connected wind turbines in the 100-1000 k1 Capacity Building in Wind Energy for PICs Presentation of the project Regional Workshop Suva

  15. Constrained capacity of MIMO Rayleigh fading channels

    E-Print Network [OSTI]

    He, Wenyan

    2011-08-08T23:59:59.000Z

    In this thesis channel capacity of a special type of multiple-input multiple-output (MIMO) Rayleigh fading channels is studied, where the transmitters are subject to a finite phase-shift keying (PSK) input alphabet. The constraint on the input...

  16. Locating PHEV exchange stations in V2G

    SciTech Connect (OSTI)

    Pan, Feng [Los Alamos National Laboratory; Bent, Russell [Los Alamos National Laboratory; Berscheid, Alan [Los Alamos National Laboratory; Izraelevitz, David [Los Alamos National Laboratory

    2010-01-01T23:59:59.000Z

    Plug-in hybrid electric vehicle (PREV) is an environment friendly modem transportation method and has been rapidly penetrate the transportation system. Renewable energy is another contributor to clean power but the associated intermittence increases the uncertainty in power generation. As a foreseen benefit of a vchicle-to-grid (V2G) system, PREV supporting infrastructures like battery exchange stations can provide battery service to PREV customers as well as being plugged into a power grid as energy sources and stabilizer. The locations of exchange stations are important for these two objectives under constraints from both ,transportation system and power grid. To model this location problem and to understand and analyze the benefit of a V2G system, we develop a two-stage stochastic program to optimally locate the stations prior to the realizations of battery demands, loads, and generation capacity of renewable power sources. Based on this model, we use two data sets to construct the V2G systems and test the benefit and the performance of these systems.

  17. Analysis of the AirTouch automatic vehicle location system's ability to locate moving vehicles

    E-Print Network [OSTI]

    Henry, Tracy Lynn

    1995-01-01T23:59:59.000Z

    Automatic vehicle location systems are becoming more prevalent in diverse transportation applications. Their ability to locate vehicles can assist in locating emergency and public transit vehicles for better real-time dispatching as well...

  18. Analysis of the AirTouch automatic vehicle location system's ability to locate moving vehicles

    E-Print Network [OSTI]

    Henry, Tracy Lynn

    1995-01-01T23:59:59.000Z

    Automatic vehicle location systems are becoming more prevalent in diverse transportation applications. Their ability to locate vehicles can assist in locating emergency and public transit vehicles for better real-time dispatching as well...

  19. Calculations of Heat-Capacities of Adsorbates

    E-Print Network [OSTI]

    LAWRENCE, WR; Allen, Roland E.

    1976-01-01T23:59:59.000Z

    PHYSICAL REVIEW B VOLUME 14, NUMBER 7 1 OCTOBER 1976 Calculations of heat capacities of adsorbates W. R. Lawrence and R. E. Allen Department of Physics, Texas A& M University, College Station, Texas 77843 (Received 2 September 1975) The phonon... the substrate has a perfect (100) surface and the adsorbate goes down as a solid monolayer in registry with the substrate. The quasiharmonic approximation was used, and the results for Ne adsorbates were considerably different from those obtained...

  20. A kinematic wave theory of capacity drop

    E-Print Network [OSTI]

    Wen-Long Jin; Qi-Jian Gan; Jean-Patrick Lebacque

    2013-10-09T23:59:59.000Z

    Capacity drop at active bottlenecks is one of the most puzzling traffic phenomena, but a thorough understanding is practically important for designing variable speed limit and ramp metering strategies. In this study, we attempt to develop a simple model of capacity drop within the framework of kinematic wave theory based on the observation that capacity drop occurs when an upstream queue forms at an active bottleneck. In addition, we assume that the fundamental diagrams are continuous in steady states. This assumption is consistent with observations and can avoid unrealistic infinite characteristic wave speeds in discontinuous fundamental diagrams. A core component of the new model is an entropy condition defined by a discontinuous boundary flux function. For a lane-drop area, we demonstrate that the model is well-defined, and its Riemann problem can be uniquely solved. We theoretically discuss traffic stability with this model subject to perturbations in density, upstream demand, and downstream supply. We clarify that discontinuous flow-density relations, or so-called "discontinuous" fundamental diagrams, are caused by incomplete observations of traffic states. Theoretical results are consistent with observations in the literature and are verified by numerical simulations and empirical observations. We finally discuss potential applications and future studies.

  1. Absentee herd owners and part-time pastoralists: the political economy of resource use in northern Kenya

    SciTech Connect (OSTI)

    Little, P.D.

    1985-06-01T23:59:59.000Z

    The prevalence of absentee herd ownership in Africa's pastoral areas is increasing. Its presence has important implications both for local resource management systems and for research programs that address pastoral ecology and related topics. This paper examines patterns of absentee herd ownership in the Baringo District of northern Kenya. This region has been the source of much debate regarding herder ''mismanagement'' of range lands. Three categories of absentee herd owners are discussed in the paper: (1) ranchers, (2) livestock traders, and (3) townsmen. It is suggested that the blame for some of the apparent resource mismanagement in the region may lie more with actors in these categories than with the pastoralists themselves. Data collected during an 18-month period in 1980-1981 on pastoral ecology, grazing patterns, and tenure institutions are presented in support of the argument. The paper concludes with a comparative analysis of contemporary resource management strategies in pastoral Africa, emphasizing that: (1) the Baringo case is not an isolated anomaly, and (2) a new orientation toward pastoral studies is warranted.

  2. The B and W Owners Group program for microstructural characterization and radiation embrittlement modelling of Linde 80 reactor vessel welds

    SciTech Connect (OSTI)

    Pavinich, W.A. [Grove Engineering, Knoxville, TN (United States); Harbison, L.S. [B and W Nuclear Technologies, Lynchburg, VA (United States)

    1996-12-31T23:59:59.000Z

    The Babcock and Wilcox Owners Group (B and WOG) is embrittlement of Linde 80 reactor vessel welds from a micro-mechanical viewpoint. Previous work that focused on characterizing the large microstructural features indicated that a large portion of the bulk copper content is in precipitate/inclusion/carbide form. This result indicates that copper in solid solution is considerably less than the bulk composition. Field-ion microscope atom probe investigations on unirradiated weld metals with bulk copper contents ranging from 0.22 to 0.38 wt%, also indicate significant amount of copper are tied up in precipitate/inclusion/carbide form. This results is significant since the bulk copper content (which includes both copper in solid solution and copper contained in precipitates, inclusions, and carbides) is used in Regulatory Guide 1.99, Revision 2 to determine radiation damage. This paper reviews these results. Existing radiation embrittlement models superpose the changes in yield strength due to defect clusters and copper-rich precipitates induced by neutron irradiation. Low-copper Linde 80 welds display little or no increase in the 41 joule (30 ft-lb) transition temperature as a result of neutron irradiation which indicates that precipitation is the dominant component of radiation embrittlement for Linde 80 welds. Future work will include further microstructural characterizations of Linde 80 reactor vessel welds and applying the existing radiation embrittlement models to Linde 80 welds. This paper describes the detailed plans for future work.

  3. National CHP Roadmap: Doubling Combined Heat and Power Capacity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP Roadmap: Doubling Combined Heat and Power Capacity in the United States by 2010, March 2001 National CHP Roadmap: Doubling Combined Heat and Power Capacity in the United States...

  4. Evaluation of capacity release transactions in the natural gas industry

    E-Print Network [OSTI]

    Lautzenhiser, Stephen

    1994-01-01T23:59:59.000Z

    The purpose of this thesis is to analyze capacity release transactions in the natural gas industry and to state some preliminary conclusions about how the capacity release market is functioning. Given FERC's attempt to ...

  5. Storage and capacity rights markets in the natural gas industry

    E-Print Network [OSTI]

    Paz-Galindo, Luis A.

    1999-01-01T23:59:59.000Z

    This dissertation presents a different approach at looking at market power in capacity rights markets that goes beyond the functional aspects of capacity rights markets as access to transportation services. In particular, ...

  6. anaerobic work capacity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aspect of working memory (WM) is the capacity to maintain goal-relevant information in mind, but little is known about how this capacity develops in the human brain. We compared...

  7. Model NOx storage systems: Storage capacity and thermal aging...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Model NOx storage systems: Storage capacity and thermal aging of BaOtheta- Al2O3NiAl(100). Model NOx storage systems: Storage capacity and thermal aging of BaOtheta- Al2O3...

  8. Optimal Capacity Conversion for Product Transitions Under High Service Requirements

    E-Print Network [OSTI]

    Li, Hongmin

    We consider the capacity planning problem during a product transition in which demand for a new-generation product gradually replaces that for the old product. Capacity for the new product can be acquired both by purchasing ...

  9. The economics of shutting and restarting primary aluminium smelting capacity

    SciTech Connect (OSTI)

    Driscoll, K.J. [CRU International, Ltd., London (United Kingdom)

    1996-10-01T23:59:59.000Z

    In recent years the aluminum industry in the Western world has been operating well below capacity, with cutbacks in production due largely to the depressed aluminum market conditions of 1992 and 1993. Since mid-1995, however, aluminum producers have begun restarting idled capacity. Extensive efforts and preparation are required both to close capacity in an orderly manner and to restart idled capacity. This paper presents a comprehensive analysis of the costs of shutting capacity, maintaining idled capacity, and restarting potlines. Costs have been calculated for a smelter which may be considered representative of the industry as a whole. Technical aspects and commercial data are outlined for the representative smelter, with costs presented under a variety of shutdown and restart conditions. Additionally, the time required to bring capacity back on-line is examined for several scenarios, and the economic impact of idled capacity is discussed.

  10. ISO New England Forward Capacity Market (Rhode Island)

    Broader source: Energy.gov [DOE]

    Under the Forward Capacity Market (FCM), ISO New England projects the capacity needs of the regions power system three years in advance and then holds an annual auction to purchase the power...

  11. Author's personal copy Ramp metering and freeway bottleneck capacity

    E-Print Network [OSTI]

    Levinson, David M.

    ; Hall and Agyemang-Duah, 1991; Banks, 1991a,b). The two-capacity hypothesis argues that metering can

  12. Constrained capacity of MIMO Rayleigh fading channels

    E-Print Network [OSTI]

    He, Wenyan

    2011-08-08T23:59:59.000Z

    . : : : : : : : : : : : : : : : : 32 1 CHAPTER I INTRODUCTION As IEEE 802.11n standards become more and more readily available in various elec- tronics products, multi-input multi-output (MIMO) has never been more accepted by the general public. With 3G networks gradually... Array? ? M N 11h NMh ijh Fig. 1. Block diagram of a MIMO system. This thesis follows the style of IEEE Transactions on Information Theory. 2 A. Previous Work on MIMO Capacity After the pioneering work on MIMO systems was published by Telatar [1...

  13. Petrochem industry expands North American MTBE capacity

    SciTech Connect (OSTI)

    Not Available

    1992-10-05T23:59:59.000Z

    This paper reports that petrochemical manufacturers continue to increase methyl tertiary butyl ether (MTBE) capacity in North America. The action reflects refiners' reformulation of gasoline to help reduce auto emissions. Demand for gasoline blending oxygenates such as MTBE is expected to increase as U.S. refiners reconfigure processing trains to produce fuels meeting requirements of the Clean Air Act amendments of 1990. Recent progress includes plans to build an MTBE plant in Mexico and start-ups of plants on the U.S. Gulf Coast and in Canada.

  14. Excess Capacity from LADWP Control Area

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of Year 2010Salt | DepartmentExamination Report:Excess Capacity from

  15. Property:Capacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation,PillarPublicationType Jump to: navigation, search This isCapRockAge JumpCapacity

  16. Property:USGSMeanCapacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod Jump to:This property isType"USGSMeanCapacity Jump to:

  17. Helicopter magnetic survey conducted to locate wells

    SciTech Connect (OSTI)

    Veloski, G.A.; Hammack, R.W.; Stamp, V. (Rocky Mountain Oilfield Testing Center); Hall, R. (Rocky Mountain Oilfield Testing Center); Colina, K. (Rocky Mountain Oilfield Testing Center)

    2008-07-01T23:59:59.000Z

    A helicopter magnetic survey was conducted in August 2007 over 15.6 sq mi at the Naval Petroleum Reserve No. 3s (NPR-3) Teapot Dome Field near Casper, Wyoming. The surveys purpose was to accurately locate wells drilled there during more than 90 years of continuous oilfield operation. The survey was conducted at low altitude and with closely spaced flight lines to improve the detection of wells with weak magnetic response and to increase the resolution of closely spaced wells. The survey was in preparation for a planned CO2 flood for EOR, which requires a complete well inventory with accurate locations for all existing wells. The magnetic survey was intended to locate wells missing from the well database and to provide accurate locations for all wells. The ability of the helicopter magnetic survey to accurately locate wells was accomplished by comparing airborne well picks with well locations from an intense ground search of a small test area.

  18. STATE OF CALIFORNIA MAXIMUM RATED TOTAL COOLING CAPACITY

    E-Print Network [OSTI]

    /09) CALIFORNIA ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-27-HERS Maximum Rated Total Cooling Capacity of the installed system (Btu/hr) 3b Sum of the ARI Rated Total Cooling Capacities of multiple systems installed Cooling Capacities of the installed cooling systems must be calculated and entered in row 3b. 4a MRTCC

  19. GROUNDWATER NITRATE REMOVAL CAPACITY OF RIPARIAN ZONES IN

    E-Print Network [OSTI]

    Gold, Art

    , and 3 in Urban watersheds to study denitrification capacity. Mini-piezometers were installed at eachGROUNDWATER NITRATE REMOVAL CAPACITY OF RIPARIAN ZONES IN URBANIZING WATERSHEDS BY TARA KIMBERLY and geomorphology of riparian zones, potentially changing riparian groundwater denitrification capacity. Little work

  20. Manure Storage Winter Capacity Planning Level Guidance January 1, 2013

    E-Print Network [OSTI]

    Guiltinan, Mark

    1 Manure Storage Winter Capacity Planning Level Guidance January 1, 2013 The guidance outlined in this document is to be used to determine the Manure Storage Winter Capacity Planning Level for CAFO operations must be documented in the NMP Standard Format. For determining the manure storage winter capacity

  1. Developing Leadership Capacity Conference The New Romantics of Responsible Leadership

    E-Print Network [OSTI]

    Diggle, Peter J.

    The 6th Developing Leadership Capacity Conference The New Romantics of Responsible Leadership 8th Conference Timetable Developing Leadership Capacity in Times of Austerity and Economic Crisis Grasmere from 6th Developing Leadership Capacity Conference Monday 7th July 2014 Venue 10.30 Round Table Event

  2. Assessing Efficiency and Capacity in Fisheries James E. Kirkley

    E-Print Network [OSTI]

    Assessing Efficiency and Capacity in Fisheries James E. Kirkley College of William and Mary.M.Ward@noaa.gov ____________________ Prepared for the National Marine Fisheries Service Workshop of "Assessing Technical Efficiency and Capacity in Fisheries (Silver Spring, Maryland; September 29 - October 1, 1999). #12;Efficiency and Capacity iv Table

  3. Capacity of Wireless Ad Hoc Networks Using Practical Directional Antennas

    E-Print Network [OSTI]

    , which is called MC-MDA network. The capacity in MC-MDA network is derived under arbitrary and random of side lobe and back lobe into account. We derive the capacity upper-bounds of MC-MDA networks decreases when s increases. Moreover, we compare the network capacity of MC-MDA using the simplified antenna

  4. TOWARDS REACHING CONSENSUS IN THE DETERMINATION OF PHOTOVOLTAICS CAPACITY CREDIT

    E-Print Network [OSTI]

    Perez, Richard R.

    , 251 Fuller Rd Albany, NY, 12203 Perez@asrc.cestm.albany,edu Mike Taylor Solar Electric Power effort to reach consensus on the notion of capacity credit for solar power electrical generation capacity or capacity credit of a power plant quantifies the output of a power plant that effectively

  5. Debra N. Thompson, PhD, RN, NEA-BC Debra N. Thompson, PhD, RN, NEA-BC, owner and principal of Debra N. Thompson, LLC holds an

    E-Print Network [OSTI]

    Sibille, Etienne

    Debra N. Thompson, PhD, RN, NEA-BC Biosketch Debra N. Thompson, PhD, RN, NEA-BC, owner and principal of Debra N. Thompson, LLC holds an Adjunct Faculty appointment as an Assistant Professor

  6. Location theory and the location of industry along an interstate highway

    E-Print Network [OSTI]

    Miller, James Patterson

    1965-01-01T23:59:59.000Z

    to determine the significance of these locational factors among plants with different characteristics that have located in certain localities should provide pertinent information with both practical and theoretical implications. Since 1956, approximately 64... Summary of Plant Location Theory Cost Fac'tots . . . . . . . . . . . . . ~ The Importance of 'the Demand Factor Greenhut's General Theory of Plant Location and the Intangible Factor Location Factors as Revealed by Empirical Study Greenhut's Case...

  7. Regenerator Location Problem in Flexible Optical Networks

    E-Print Network [OSTI]

    BARIS YILDIZ

    2014-11-22T23:59:59.000Z

    Nov 22, 2014 ... Abstract: In this study we introduce the regenerator location problem in flexible optical networks (RLP-FON). With a given traffic demand,...

  8. Information storage capacity of discrete spin systems

    SciTech Connect (OSTI)

    Yoshida, Beni, E-mail: rouge@caltech.edu

    2013-11-15T23:59:59.000Z

    Understanding the limits imposed on information storage capacity of physical systems is a problem of fundamental and practical importance which bridges physics and information science. There is a well-known upper bound on the amount of information that can be stored reliably in a given volume of discrete spin systems which are supported by gapped local Hamiltonians. However, all the previously known systems were far below this theoretical bound, and it remained open whether there exists a gapped spin system that saturates this bound. Here, we present a construction of spin systems which saturate this theoretical limit asymptotically by borrowing an idea from fractal properties arising in the Sierpinski triangle. Our construction provides not only the best classical error-correcting code which is physically realizable as the energy ground space of gapped frustration-free Hamiltonians, but also a new research avenue for correlated spin phases with fractal spin configurations. -- Highlights: We propose a spin model with fractal ground states and study its coding properties. We show that the model asymptotically saturates a theoretical limit on information storage capacity. We discuss its relations to various theoretical physics problems.

  9. Automated Fault Location In Smart Distribution Systems

    E-Print Network [OSTI]

    Lotfifard, Saeed

    2012-10-19T23:59:59.000Z

    ............................................................................................................................ 88 x LIST OF FIGURES Page Figure 1 Multiple possible fault location estimation for a fault at node A ........................ 7 Figure 2 Simple faulted network model [1] [2011] IEEE ............................................ 40 Figure 3... Types C and D voltage sags for different phases [51] [2003] IEEE .............. 42 Figure 4 Rf estimation procedure [1] [2011] IEEE ...................................................... 45 Figure 5 Flow chart of the fault location algorithm [1...

  10. RECYCLING PROGRAM TYPE LOCATION ALLOWED NOT ALLOWED

    E-Print Network [OSTI]

    Miami, University of

    RECYCLING PROGRAM TYPE LOCATION ALLOWED NOT ALLOWED Batteries, toner, ink cartridges & cell phones and recycling is an important part of that effort. Below is a guide to on-campus recycling at RSMAS: Visit http://www.rsmas.miami.edu/msgso/ for map of recycling bin locations. NOTE: This is not an exhaustive list. If unauthorized items are found

  11. Optimized Fault Location Final Project Report

    E-Print Network [OSTI]

    Engineering Research Center Optimized Fault Location Concurrent Technologies Corporation Final Project Report by the Concurrent Technologies Corporation (CTC) and the Power Systems Engineering Research Center (PSERC). NeitherOptimized Fault Location Final Project Report Power Systems Engineering Research Center A National

  12. Locating and tracking assets using RFID

    E-Print Network [OSTI]

    Kim, Gak Gyu

    2009-05-15T23:59:59.000Z

    , this research presents a mathematical model of using RFID (both handheld readers and stationary readers) for e?cient asset location. We derive the expected cost of locating RFIDtagged objects in a multiarea environment where handheld RF readers are used. We...

  13. Location Privacy and the Personal Distributed Environment

    E-Print Network [OSTI]

    Atkinson, Robert C

    Location Privacy and the Personal Distributed Environment Robert C Atkinson, Swee Keow Goo, James-- The Personal Distributed Environment is a new concept being developed within the Mobile VCE Core 3 research, wherever their location: ubiquitous access. Devices are co-ordinated by Device Management Entities (DMEs

  14. Adsorption -capacity data for 283 organic compounds

    SciTech Connect (OSTI)

    Yaws, C.L.; Bu, L.; Nijhawan, S. [Lamar Univ., Beaumont, TX (United States)

    1995-05-01T23:59:59.000Z

    Adsorption on activated carbon is a widely used method for removing volatile organic compounds (VOCs) from gases and other exhaust streams. This article presents a compilation of adsorption-capacity data as a function of the VOC concentration in the gas. The results are useful in engineering and environmental studies, and in the design of carbon-based adsorption systems to remove unwanted organic pollutants from gases. For vapor control, carbon-based systems typically combine a carbon-adsorption unit with a secondary control method to reclaim or destroy the vapors desorbed during carbon-bed regeneration. To remove organics dissolved in wastewater, air stripping is typically used to transfer the organics to a vapor stream. Carbon adsorption is then used to separate the organics from the stripper exhaust. Collected vapors can be recovered for reuse or destroyed, depending on their value.

  15. Korean oxygenates rule sparks MTBE capacity plans

    SciTech Connect (OSTI)

    Kim, Hyung-Jin

    1994-06-15T23:59:59.000Z

    The Korean government`s strict standard for gasoline sold domestically is expected to have a significant impact on the methyl tert-butyl ether (MTBE) market. The mandate-requiring gasoline oxygen content of 0.5% this year, 0.75% by 1996, and 1.0% by 1998-has sparked a rush by Korean refineries to build new MTBE plants. If expansion plans are carried out, Korea`s MTBE capacity will increase from 280,000 m.t./year to 650,000 m.t./year by 1996, far surpassing predicted demand. Honam Oil, part of the Lucky Group, plans startup of a 100,000-m.t./year unit at Yeochon by early 1996. In addition, by the end of 1996 Ssangyong Oil will bring a 100,000-m.t./year unit onstream.

  16. Information storage capacity of discrete spin systems

    E-Print Network [OSTI]

    Beni Yoshida

    2012-12-24T23:59:59.000Z

    Understanding the limits imposed on information storage capacity of physical systems is a problem of fundamental and practical importance which bridges physics and information science. There is a well-known upper bound on the amount of information that can be stored reliably in a given volume of discrete spin systems which are supported by gapped local Hamiltonians. However, all the previously known systems were far below this theoretical bound, and it remained open whether there exists a gapped spin system that saturates this bound. Here, we present a construction of spin systems which saturate this theoretical limit asymptotically by borrowing an idea from fractal properties arising in the Sierpinski triangle. Our construction provides not only the best classical error-correcting code which is physically realizable as the energy ground space of gapped frustration-free Hamiltonians, but also a new research avenue for correlated spin phases with fractal spin configurations.

  17. Modeling the Capacity and Emissions Impacts of Reduced Electricity Demand. Part 1. Methodology and Preliminary Results.

    E-Print Network [OSTI]

    Coughlin, Katie

    2013-01-01T23:59:59.000Z

    in the required total installed capacity (GW). Additionalemissions and installed capacity per unit of generationb) The change in installed capacity by fuel/technology type,

  18. The NASA CSTI High Capacity Power Program

    SciTech Connect (OSTI)

    Winter, J.M.

    1994-09-01T23:59:59.000Z

    The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase I of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA`s new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems - Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability and 7 to 10 years lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operation as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed.

  19. Development and Testing of a High Capacity Plasma Chemical Reactor in the Ukraine

    SciTech Connect (OSTI)

    Reilly, Raymond W.

    2012-07-30T23:59:59.000Z

    This project, Development and Testing of a High Capacity Plasma Chemical Reactor in the Ukraine was established at the Kharkiv Institute of Physics and Technology (KIPT). The associated CRADA was established with Campbell Applied Physics (CAP) located in El Dorado Hills, California. This project extends an earlier project involving both CAP and KIPT conducted under a separate CRADA. The initial project developed the basic Plasma Chemical Reactor (PCR) for generation of ozone gas. This project built upon the technology developed in the first project, greatly enhancing the output of the PCR while also improving reliability and system control.

  20. The Construction of Locative Situations: Locative Media and the Situationist International, Recuperation or Redux?

    E-Print Network [OSTI]

    McGarrigle, Conor

    2009-01-01T23:59:59.000Z

    closely aligned to the SI's construction of situations. ThisG (1957) Report on the Construction of Situations and on theThe Construction of Locative Situations: Locative Media and

  1. SFSU Building Coordinators List College or Administrative Unit Location(s)

    E-Print Network [OSTI]

    SFSU Building Coordinators List College or Administrative Unit Location(s) Building Coordinator81193 cathym@sfsu.edu GYM 102B Student Services Building SSB Mirel Tikkanen x53566 mtikkane@sfsu.edu SSB

  2. Method of locating underground mines fires

    DOE Patents [OSTI]

    Laage, Linneas (Eagam, MN); Pomroy, William (St. Paul, MN)

    1992-01-01T23:59:59.000Z

    An improved method of locating an underground mine fire by comparing the pattern of measured combustion product arrival times at detector locations with a real time computer-generated array of simulated patterns. A number of electronic fire detection devices are linked thru telemetry to a control station on the surface. The mine's ventilation is modeled on a digital computer using network analysis software. The time reguired to locate a fire consists of the time required to model the mines' ventilation, generate the arrival time array, scan the array, and to match measured arrival time patterns to the simulated patterns.

  3. Surface and bulk modified high capacity layered oxide cathodes with low irreversible capacity loss

    DOE Patents [OSTI]

    Manthiram, Arumugam (Austin, TX); Wu, Yan (Austin, TX)

    2010-03-16T23:59:59.000Z

    The present invention includes compositions, surface and bulk modifications, and methods of making of (1-x)Li[Li.sub.1/3Mn.sub.2/3]O.sub.2.xLi[Mn.sub.0.5-yNi.sub.0.5-yCo.sub.2- y]O.sub.2 cathode materials having an O3 crystal structure with a x value between 0 and 1 and y value between 0 and 0.5, reducing the irreversible capacity loss in the first cycle by surface modification with oxides and bulk modification with cationic and anionic substitutions, and increasing the reversible capacity to close to the theoretical value of insertion/extraction of one lithium per transition metal ion (250-300 mAh/g).

  4. THE PLANAR HUB LOCATION PROBLEM: A PROBABILISTIC ...

    E-Print Network [OSTI]

    2012-11-21T23:59:59.000Z

    Nov 5, 2012 ... Aykin and Brown, [4]. ...... [8] J.F. Campbell, Integer programming formulations of discrete hub location problems, European J. of O.R.. 72(1994)...

  5. Developing a theory of nightclub location choice

    E-Print Network [OSTI]

    Crim, Stephen J. (Stephen Johnson)

    2008-01-01T23:59:59.000Z

    This work is an investigation of the factors that influence where nightclubs locate within a city. Nightclubs, like other social spaces, provide important social and economic benefits in the urban environment. As amenities, ...

  6. Techniques for Mobile Location Estimation in UMTS

    E-Print Network [OSTI]

    Thomas, Nicholas J

    The subject area of this thesis is the locating of mobile users using the future 3rd generation spread spectrum communication system UMTS. The motivation behind this work is twofold: firstly the United States Federal ...

  7. Driver expectancy in locating automotive controls

    E-Print Network [OSTI]

    Francis, Dawn Suzette

    1990-01-01T23:59:59.000Z

    DRIVER EXPECTANCY IN LOCATING AUTOMOTIVE CONTROLS A Thesis by DAWN SUZETTE FRANCIS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1990... Major Subject: Industrial Engineering DRIVER EXPECTANCY IN LOCATING AUTOMOTIVE CONTROLS A Thesis by DAWN SUZETTE FRANCIS Approved as to style and content by: R. Dale Huchi son (Chair of Committee) Rodger . . ppa (Member) Waymon L ohnston (M er...

  8. Driver expectancy in locating automotive controls

    E-Print Network [OSTI]

    Francis, Dawn Suzette

    1990-01-01T23:59:59.000Z

    Major Subject: Industrial Engineering DRIVER EXPECTANCY IN LOCATING AUTOMOTIVE CONTROLS A Thesis by DAWN SUZETTE FRANCIS Approved as to style and content by: R. Dale Huchi son (Chair of Committee) Rodger . . ppa (Member) Waymon L ohnston (M er... assessment of automotive industry practices in 1971 and concluded that only 50% of controls/displays on various models could be said to have a common location. Perel (1974) reviewed prior research and found that it would be difficult to pinpoint...

  9. Locating Boosted Kerr and Schwarzschild Apparent Horizons

    E-Print Network [OSTI]

    Mijan F. Huq; Matthew W. Choptuik; Richard A. Matzner

    2000-02-22T23:59:59.000Z

    We describe a finite-difference method for locating apparent horizons and illustrate its capabilities on boosted Kerr and Schwarzschild black holes. Our model spacetime is given by the Kerr-Schild metric. We apply a Lorentz boost to this spacetime metric and then carry out a 3+1 decomposition. The result is a slicing of Kerr/Schwarzschild in which the black hole is propagated and Lorentz contracted. We show that our method can locate distorted apparent horizons efficiently and accurately.

  10. An Efficient Algorithm for Computing Robust Minimum Capacity st Cuts

    E-Print Network [OSTI]

    Doug Altner

    2008-03-20T23:59:59.000Z

    Mar 20, 2008 ... In this paper, we present an efficient algorithm for computing minimum capacity s-t cuts under a polyhedral model of robustness. Our algorithm...

  11. Indonesia-ECN Capacity building for energy policy formulation...

    Open Energy Info (EERE)

    building for energy policy formulation and implementation of sustainable energy projects Jump to: navigation, search Name CASINDO: Capacity development and strengthening for energy...

  12. Open versus closed loop capacity equilibria in electricity markets ...

    E-Print Network [OSTI]

    S. Wogrin

    2012-05-07T23:59:59.000Z

    May 7, 2012 ... Abstract: We consider two game-theoretic models of the generation capacity expansion problem in liberalized electricity markets. The first is an...

  13. CLEAN-Capacity Building and Training for Low Emissions Development...

    Open Energy Info (EERE)

    Development Planning Jump to: navigation, search Tool Summary Name: CLEAN-Capacity Building and Training for Low Emissions Development Planning AgencyCompany Organization:...

  14. Optimization of Flexural capacity Of Reinforced fibrous concrete ...

    E-Print Network [OSTI]

    D Suji

    2005-12-22T23:59:59.000Z

    Dec 22, 2005 ... Optimization of Flexural capacity Of Reinforced fibrous concrete Beams Using Genetic Algorithm. D Suji (suji_mohan2002 ***at*** yahoo.com)

  15. affecting energy capacity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    organization of Santiago affects its capacity to design and apply urban energy initiatives MIT - DSpace Summary: The need for greater levels of energy efficiency has never...

  16. Geothermal: Sponsored by OSTI -- Geothermal Plant Capacity Factors

    Office of Scientific and Technical Information (OSTI)

    Plant Capacity Factors Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us HomeBasic Search About Publications Advanced Search New Hot Docs News Related...

  17. Design and Evaluation of Novel High Capacity Cathode Materials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Design and Evaluation of Novel High Capacity Cathode Materials Lithium Source For High Performance Li-ion Cells Lithium Source For High Performance Li-ion...

  18. DOE Receives Responses on the Implementation of Large-Capacity...

    Broader source: Energy.gov (indexed) [DOE]

    Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process Electrolux Gibson Air Conditioner and Equator Clothes Washer Fail DOE Energy Star Testing...

  19. assessing nuclear capacity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    who are familiar Langendoen, Koen 5 Assessing the Control Systems Capacity for Demand Response in Energy Storage, Conversion and Utilization Websites Summary: LBNL-5319E...

  20. Serbia-Enhancing Capacity for Low Emission Development Strategies...

    Open Energy Info (EERE)

    for Low Emission Development Strategies (EC-LEDS) Jump to: navigation, search Name Serbia-Enhancing Capacity for Low Emission Development Strategies (EC-LEDS) AgencyCompany...

  1. The NASA CSTI High Capacity Power Project

    SciTech Connect (OSTI)

    Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Titran, R. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Schmitz, P. [Sverdrup Technology, Inc., Brook Park, OH (United States). Lewis Research Center Group; Vandersande, J. [Jet Propulsion Lab., Pasadena, CA (United States)

    1994-09-01T23:59:59.000Z

    The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase I of SP-100 and to strengthen, in key areas, the changes for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the CSTI High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project with develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

  2. Microsystems technologist workforce development capacity and challenges in Central New Mexico.

    SciTech Connect (OSTI)

    Osborn, Thor D.

    2008-04-01T23:59:59.000Z

    Sandia National Laboratories has made major investments in microsystems-related infrastructure and research staff development over the past two decades, culminating most recently in the MESA project. These investment decisions have been made based in part upon the necessity for highly reliable, secure, and for some purposes, radiation-hardened devices and subsystems for safety and sustainability of the United States nuclear arsenal and other national security applications. SNL's microsystems development and fabrication capabilities are located almost entirely within its New Mexico site, rendering their effectiveness somewhat dependent on the depth and breadth of the local microsystems workforce. Consequently, the status and development capacity of this workforce has been seen as a key personnel readiness issue in relation to the maintenance of SNL's microsystems capabilities. For this reason SNL has supported the instantiation and development of the Southwest Center for Microsystems Education, an Advanced Technology Education center funded primarily by the National Science Foundation, in order to foster the development of local training capacity for microsystems technologists. Although the SCME and the associated Manufacturing Technology program at Central New Mexico Community College have developed an effective curriculum and graduated several highly capable microsystems technologists, the future of both the center and the degree program remain uncertain due to insufficient student enrollment. The central region of New Mexico has become home to many microsystems-oriented commercial firms. As the demands of those firms for technologists evolve, SNL may face staffing problems in the future, especially if local training capacity is lost.

  3. Use Remote Sensing Data (selected visible and infrared spectrums) to locate high temperature ground anomalies in Colorado. Confirm heat flow potential with on-site surveys to drill deep resource wells

    Broader source: Energy.gov [DOE]

    DOE Geothermal Technologies Peer Review 2010 - Presentation. Project Objectives: A cost effective three (3) Phased Program to locate and confirm up to Five (5) commercial geothermal resources in Colorado. The heat resources to be prioritized will be those able to support a minimum electrical generation capacity of 10 MW by location.

  4. Capacity Building on Access to Energy in Africa: Final Report

    E-Print Network [OSTI]

    Capacity Building on Access to Energy in Africa: Final Report Danish Support to EUEI Facilitation from African partner organisations and individuals Title: Capacity Building on Access to Energy (Danish Ministry of Foreign Affairs) Cover: Solar home system installed at house near Chipata, Eastern

  5. MASTERS REPORT ANALYSIS AND MODELING OF ACID NEUTRALIZING CAPACITY

    E-Print Network [OSTI]

    itself against acidification and is used to monitor the effect of acid rain on watersheds. From 1993MASTERS REPORT ANALYSIS AND MODELING OF ACID NEUTRALIZING CAPACITY IN THE MID-ATLANTIC HIGHLANDS UNIVERSITY #12;ABSTRACT Acid Neutralizing Capacity (ANC) is a measure of a solution's ability to buffer

  6. Multicomponent Adsorption and Chromatography with Uneven Saturation Capacities

    E-Print Network [OSTI]

    Gu, Tingyue

    Multicomponent Adsorption and Chromatography with Uneven Saturation Capacities Tingyue Gu, Gow, the extent of size exclusion is not the same for all the components. This often causes uneven adsorption capacity and vice versa. A study of size exclusion coupled with adsorption is a rel- atively new topic

  7. Asymptotic entanglement capacity of the Ising and anisotropic Heisenberg interactions

    E-Print Network [OSTI]

    Childs, A M; Verstraete, F; Vidal, G

    2003-01-01T23:59:59.000Z

    We compute the asymptotic entanglement capacity of the Ising interaction ZZ, the anisotropic Heisenberg interaction XX + YY, and more generally, any two-qubit Hamiltonian with normal form K = a XX + b YY. We also describe an entanglement assisted classical communication protocol using the Hamiltonian K with rate equal to the asymptotic entanglement capacity.

  8. Adaptive Online Battery Parameters/SOC/Capacity Co-estimation

    E-Print Network [OSTI]

    Chow, Mo-Yuen

    and even storage ageing of the battery. Following our previous publications in which we developed an onlineAdaptive Online Battery Parameters/SOC/Capacity Co-estimation Habiballah Rahimi-Eichi and Mo parameters to characterize the performance and application of a battery. Although the nominal capacity

  9. Prediction methods for capacity of drag anchors in clayey soils

    E-Print Network [OSTI]

    Yoon, Yeo Hoon

    2002-01-01T23:59:59.000Z

    A drag anchor is a marine foundation element, which is penetrated into the seabed by dragging in order to generate a required capacity. The holding capacity of a drag anchor in a particular soil condition is developed by soil resistance acting...

  10. On the Capacity of Hybrid Wireless Networks Benyuan Liu

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    On the Capacity of Hybrid Wireless Networks Benyuan Liu , Zhen Liu + , Don Towsley Department 704 Yorktown Heights, NY 10598 Abstract-- We study the throughput capacity of hybrid wireless networks stations are assumed to be connected by a high-bandwidth wired network and act as relays for wireless nodes

  11. A Framework for the Capacity Evaluation of Multihop Wireless Networks

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    A Framework for the Capacity Evaluation of Multihop Wireless Networks Herve Rivano CNRS - INRIA and localized CDS. Index Terms--network capacity, multihop wireless networks, upper and lower bounds, linear programing I. INTRODUCTION Ad hoc networks are spontaneous multihop topologies of wireless nodes

  12. Does Beamforming achieve Outage Capacity with Direction Feedback?

    E-Print Network [OSTI]

    Jafar, Syed A.

    Does Beamforming achieve Outage Capacity with Direction Feedback? Sudhir Srinivasa and Syed Ali Jafar Sriram Vishwanath Electrical Engineering and Computer Science Electrical and Computer Engineering: syed@ece.uci.edu, sudhirs@uci.edu Email: sriram@ece.utexas.edu Abstract We explore the outage capacity

  13. Energy-Efficient Capacity Optimization in Wireless Networks

    E-Print Network [OSTI]

    Wang, Yu

    Energy-Efficient Capacity Optimization in Wireless Networks Lu Liu, Xianghui Cao, Yu Cheng, Lili Du capacity in the most energy-efficient manner over a general large-scale wireless network, say, a multi numerical results demonstrate the energy efficiency improvement by the proposed energy-efficient

  14. Sizing Storage and Wind Generation Capacities in Remote Power Systems

    E-Print Network [OSTI]

    Victoria, University of

    Sizing Storage and Wind Generation Capacities in Remote Power Systems by Andy Gassner B Capacities in Remote Power Systems by Andy Gassner B.Sc., University of Wisconsin Madison, 2003 Supervisory and small power systems. However, the variability due to the stochastic nature of the wind resource

  15. ORIGINAL ARTICLE Effect of Different Sitting Postures on Lung Capacity,

    E-Print Network [OSTI]

    Makhsous, Mohsen

    ORIGINAL ARTICLE Effect of Different Sitting Postures on Lung Capacity, Expiratory Flow, and Lumbar, Makhsous M. Effect of different sitting postures on lung capacity, expiratory flow, and lumbar lordosis. Arch Phys Med Rehabil 2006;87:504-9. Objective: To investigate the effect of sitting posture on lung

  16. Reconstructing Spatial Distributions from Anonymized Locations

    SciTech Connect (OSTI)

    Horey, James L [ORNL] [ORNL; Forrest, Stephanie [University of New Mexico, Albuquerque] [University of New Mexico, Albuquerque; Groat, Michael [University of New Mexico, Albuquerque] [University of New Mexico, Albuquerque

    2012-01-01T23:59:59.000Z

    Devices such as mobile phones, tablets, and sensors are often equipped with GPS that accurately report a person's location. Combined with wireless communication, these devices enable a wide range of new social tools and applications. These same qualities, however, leave location-aware applications vulnerable to privacy violations. This paper introduces the Negative Quad Tree, a privacy protection method for location aware applications. The method is broadly applicable to applications that use spatial density information, such as social applications that measure the popularity of social venues. The method employs a simple anonymization algorithm running on mobile devices, and a more complex reconstruction algorithm on a central server. This strategy is well suited to low-powered mobile devices. The paper analyzes the accuracy of the reconstruction method in a variety of simulated and real-world settings and demonstrates that the method is accurate enough to be used in many real-world scenarios.

  17. Location theory and the location of industry along an interstate highway

    E-Print Network [OSTI]

    Miller, James Patterson

    1965-01-01T23:59:59.000Z

    a greater gamble. This sect. ion has been devoted to s review of the fundamental factors underlying all plant location ss recognised in location theory. The next section will review some recent. empirical attempts to determine the actual... for this thesis was possible through the assistance provided )ointly by the Texas Highway Department and the Bureau of Public Roads. i. v TABLE OF CONTENTS Chapter Page INTRODUCTION Purpose Plan of Study REVIEW OF PLANT LOCATION CONCEPTS Introduction...

  18. An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

    2004-06-01T23:59:59.000Z

    This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

  19. Utility Locating in the DOE Environment

    SciTech Connect (OSTI)

    Clark Scott; Gail Heath

    2006-04-01T23:59:59.000Z

    Some advances have been made in utility locating in recent years and standards have been recently published to try and categorize the level of information known about the utility in the subsurface. At the same time some characterization about the level of effort or technology in the geophysicist approach to utility locating may be generalized. The DOE environment poses some added difficulties and this presentation covers these issues, costs and the technical approach that has been developed at the INEEL to prevent utility hits and how it fits into the generalized classification of effort.

  20. Locating and tracking assets using RFID

    E-Print Network [OSTI]

    Kim, Gak Gyu

    2009-05-15T23:59:59.000Z

    . . . . . . . . . . . . . . . . . . . . . . . . 10 C. Different Technologies for Asset Tracking / Locating . . . . 10 1. Hand-held Reader . . . . . . . . . . . . . . . . . . . . 11 2. Fixed Reader Installed in Area . . . . . . . . . . . . . 11 3. Fixed Reader Installed at Chokepoint... . . . . . . . . . . . 34 a. CaseofInstallingtheFixedReaderintheMost Probable Area . . . . . . . . . . . . . . . . . . . . 35 b. Case of Installing the Fixed Reader in the Far- thest Area . . . . . . . . . . . . . . . . . . . . . . 36 3. Extension of Experiments...

  1. Recycling Bin Guide Locations and prices

    E-Print Network [OSTI]

    Kirschner, Denise

    Recycling Bin Guide Locations and prices Metal Bins Deskside Bins with Side Saddle Rubbermaid Bins.58 for auxiliaries. And Non-Public Areas Public Offices Non-Public Recyclables Recyclables RecyclablesTrash Trash Trash #12;New Recycling Bin Guidelines Frequently Asked Questions (as of December 2008) Why

  2. Ontology-based Disambiguation of Spatiotemporal Locations

    E-Print Network [OSTI]

    Hyvnen, Eero

    , in the semantic portal MuseumFinland3 [7] a location parton- omy4 was used for annotating museum artifacts. #12;A problem when creating a semantic cultural heritage portal is that places, both modernFinland originate from regions that no longer exist and/or are not part of Finland but of Russia with new names

  3. Transportation Networks and Location A Geometric Approach

    E-Print Network [OSTI]

    Palop del Río, Belén

    Transportation Networks and Location A Geometric Approach Belén Palop1,2 1Departamento de March 2009 Florida State University #12;Belén Palop, UVa, SUNY Outline Transportation Network Model;Transportation Network Model Belén Palop, UVa, SUNY Outline Transportation Network Model Network placement

  4. Exact Location : Date of Accident : AM PM

    E-Print Network [OSTI]

    Swaddle, John

    SSN Cell Phone Home Phone Work Phone Exact Location : Date of Accident : AM PM Date accident treatment provided? Yes No Where Was time lost from work? Yes No If yes, how long? Could this accident have the following information as soon as it relates to your work related accident/injury/illness within 72 hours

  5. Heat capacity of liquids: an approach from the solid phase

    E-Print Network [OSTI]

    Kostya Trachenko

    2008-08-20T23:59:59.000Z

    We calculate the energy and heat capacity of a liquid on the basis of its elastic properties and vibrational states. The experimental decrease of liquid heat capacity with temperature is attributed to the increasing loss of two transverse modes with frequency $\\omegaliquid relaxation time. In a simple model, liquid heat capacity is related to viscosity and is compared with the experimental data of mercury. We also calculate the vibrational energy of a quantum liquid, and show that transverse phonons can not be excited in the low-temperature limit. Finally, we discuss the implications of the proposed approach to liquids for the problem of glass transition.

  6. RESIDENTIAL LOCATION CHOICE AND TRAVEL BEHAVIOR: IMPLICATIONS FOR AIR QUALITY

    E-Print Network [OSTI]

    Levinson, David M.

    RESIDENTIAL LOCATION CHOICE AND TRAVEL BEHAVIOR: IMPLICATIONS FOR AIR QUALITY UC Davis-Caltrans Air control measure. #12;RESIDENTIAL LOCATION CHOICE AND TRAVEL BEHAVIOR: IMPLICATIONS FOR AIR QUALITY.......................................................... 3 2.2 The Role of Residential Location Choice

  7. VCSEL fault location apparatus and method

    DOE Patents [OSTI]

    Keeler, Gordon A. (Albuquerque, NM); Serkland, Darwin K. (Albuquerque, NM)

    2007-05-15T23:59:59.000Z

    An apparatus for locating a fault within an optical fiber is disclosed. The apparatus, which can be formed as a part of a fiber-optic transmitter or as a stand-alone instrument, utilizes a vertical-cavity surface-emitting laser (VCSEL) to generate a test pulse of light which is coupled into an optical fiber under test. The VCSEL is subsequently reconfigured by changing a bias voltage thereto and is used as a resonant-cavity photodetector (RCPD) to detect a portion of the test light pulse which is reflected or scattered from any fault within the optical fiber. A time interval .DELTA.t between an instant in time when the test light pulse is generated and the time the reflected or scattered portion is detected can then be used to determine the location of the fault within the optical fiber.

  8. Automated Fault Location In Smart Distribution Systems

    E-Print Network [OSTI]

    Lotfifard, Saeed

    2012-10-19T23:59:59.000Z

    Quality Meters (PQM), are installed to capture harmonics and certain disturbances for analyzing the power quality indices. Digital Protective Relays are utilized to detect occurrence of the faults and isolate faulted section as fast as possible. Digital... Protective Relays) use synchronous methods [28]. Therefore, if the available data is provided by RTUs, fault location methods that operate based on direct comparison of the input samples cannot be 17 utilized. However, if the data could be gathered from...

  9. Information Capacity of an Energy Harvesting Sensor Node

    E-Print Network [OSTI]

    Viswanath, Pramod

    practical architectures. Our main result is the characterization of the Shannon capacity. INTRODUCTION Sensor nodes are often deployed for monitoring a random field. These nodes are characterized by limited battery power, computational resources and storage space. Once deployed, the battery

  10. Capacity Requirements to Support Inter-Balancing Area Wind Delivery

    SciTech Connect (OSTI)

    Kirby, B.; Milligan, M.

    2009-07-01T23:59:59.000Z

    Paper examines the capacity requirements that arise as wind generation is integrated into the power system and how those requirements change depending on where the wind energy is delivered.

  11. Increasing Freeway Merge Capacity Through On-Ramp Metering

    E-Print Network [OSTI]

    Rudjanakanoknad, Jittichai

    2005-01-01T23:59:59.000Z

    Hall, F. L. and Agywmang-Duah, K. (1991), Freeway capacity1990; Hall and Agyemang-Duah, 1991). As explained below,Later, Hall and Agyemang- Duah (1991) studied a freeway

  12. Minimum Cost Capacity Installation for Multicommodity Network Flows \\Lambda

    E-Print Network [OSTI]

    Bienstock, Daniel

    Capacity Installation (MCCI) problem. Applications of MCCI are commonly seen in the design for MCCI and then we transform this for mulation to a lower dimensional space by projecting out all

  13. Global Installed Capacity of Coal Fired Power Generation to Reach...

    Open Energy Info (EERE)

    Global Installed Capacity of Coal Fired Power Generation to Reach 2,057.6 GW by 2019 Home > Groups > Increase Natural Gas Energy Efficiency John55364's picture Submitted by...

  14. Capacity planning and admission control policies for intensive care units

    E-Print Network [OSTI]

    Chaiwanon, Wongsakorn

    2010-01-01T23:59:59.000Z

    Poor management of the patient flow in intensive care units (ICUs) causes service rejections and presents significant challenges from the standpoint of capacity planning and management in ICUs. This thesis reports on the ...

  15. High capacity stabilized complex hydrides for hydrogen storage

    DOE Patents [OSTI]

    Zidan, Ragaiy; Mohtadi, Rana F; Fewox, Christopher; Sivasubramanian, Premkumar

    2014-11-11T23:59:59.000Z

    Complex hydrides based on Al(BH.sub.4).sub.3 are stabilized by the presence of one or more additional metal elements or organic adducts to provide high capacity hydrogen storage material.

  16. Saudi production capacity climbing to 10 million b/d

    SciTech Connect (OSTI)

    Not Available

    1994-07-11T23:59:59.000Z

    Saudi Arabia this year is completing its expansion of production capacity and developing recent discoveries to enhance export flexibility. The 3 million b/d capacity expansion to 10 million b/d, announced in 1989, is on target for completion by year end 1994. Most of the effort involves restoration of mothballed production equipment and installation of several gas-oil separation plants (GOSPs) in existing fields. But Saudi Arabian Oil Co. (Saudi Aramco) also this year will start up production of extra-light oil from a new field in the central part of the kingdom. Start-up of Hawtah area production demonstrates success of an oil search Aramco began after receiving exclusive exploration rights to nearly all of Saudi Arabia's prospective area in 1986. From new fields and traditional producing areas, therefore, Saudi Arabia has the potential to expand production capacity beyond 10 million b/d. The paper describes the development of the extra capacity.

  17. Development of large-capacity gas-insulated transformer

    SciTech Connect (OSTI)

    Takahashi, E.; Tanaka, K. [Tokyo Electric Power Co., Ltd. (Japan)] [Tokyo Electric Power Co., Ltd. (Japan); Toda, K.; Ikeda, M.; Teranishi, T.; Inaba, M.; Yanari, T. [Toshiba Corp., Kawasaki (Japan)] [Toshiba Corp., Kawasaki (Japan)

    1996-04-01T23:59:59.000Z

    Concentrations of population and business activities result in high electricity demand in urban areas. This requires the construction of large-capacity underground substations. Oilless, non-flammable and non-explosive equipment is recommended for underground substations. Therefore, several types of large-capacity gas-insulated transformer have been developed. Because the gas forced cooling type was considered to be available up to approximately 60 MVA, all of these gas-insulated transformers are liquid cooled. But the liquid cooling type has the disadvantage of a complex structure for liquid cooling. For this reason, the authors have been studying the development of a simple design for a gas forced cooling, large-capacity gas-insulated transformer. This paper discusses research and development of cooling and insulation technology for a large-capacity gas-insulated transformer and the development of a 275 kV, 300 MVA gas-insulated transformer.

  18. Design and Evaluation of Novel High Capacity Cathode Materials...

    Broader source: Energy.gov (indexed) [DOE]

    the reaction is, in turn, intercalated into the negative electrode (i.e. graphite, graphene composites, intermetallics, Si-C composites, high-capacity TiO 2 (B bronze), TiO 2...

  19. Capacity planning and change management in an aerospace overhaul cell

    E-Print Network [OSTI]

    Walker, David, M.B.A. Massachusetts Institute of Technology

    2013-01-01T23:59:59.000Z

    Purpose - This thesis analyzes the transformation of the Small Components Cell in Pratt & Whitney's aftermarket division through lean manufacturing techniques. The thesis focuses on use of a labor capacity planning model, ...

  20. Development of operations based long range network capacity planning models

    E-Print Network [OSTI]

    Wilson, Cynthia M. (Cynthia Marie)

    2011-01-01T23:59:59.000Z

    Planning for vaccines manufacturing capacity is both a complex task requiring many inputs and an important function of manufacturers to ensure the supply of vaccines that prevent life-threatening illnesses. This thesis ...

  1. Creative capacity building in post-conflict Uganda

    E-Print Network [OSTI]

    Taha, Kofi A. (Kofi Abdul Malik)

    2011-01-01T23:59:59.000Z

    Creative Capacity Building (CCB) is a methodology that emphasizes the ability of people living in poverty to create livelihood technologies, i.e., machines and tools that increase income, improve health and safety, decrease ...

  2. Predictive capacity planning modeling with tactical and strategic applications

    E-Print Network [OSTI]

    Zeppieri, Michael A. (Michael Anthony), 1975-

    2004-01-01T23:59:59.000Z

    The focus of my internship was the development of a predictive capacity planning model to characterize the storage requirements and space utilization for Amazon's Campbellsville (SDF) Fulfillment Center (FC). Amazon currently ...

  3. Real options approach to capacity planning under uncertainty

    E-Print Network [OSTI]

    Mittal, Geetanjali, 1979-

    2004-01-01T23:59:59.000Z

    This thesis highlights the effectiveness of Real Options Analysis (ROA) in capacity planning decisions for engineering projects subject to uncertainty. This is in contrast to the irreversible decision-making proposed by ...

  4. Nitrogen expander cycles for large capacity liquefaction of natural gas

    SciTech Connect (OSTI)

    Chang, Ho-Myung; Park, Jae Hoon; Gwak, Kyung Hyun [Hong Ik University, Department of Mechanical Engineering, Seoul, 121-791 (Korea, Republic of); Choe, Kun Hyung [Korea Gas Corporation, Incheon, 406-130 (Korea, Republic of)

    2014-01-29T23:59:59.000Z

    Thermodynamic study is performed on nitrogen expander cycles for large capacity liquefaction of natural gas. In order to substantially increase the capacity, a Brayton refrigeration cycle with nitrogen expander was recently added to the cold end of the reputable propane pre-cooled mixed-refrigerant (C3-MR) process. Similar modifications with a nitrogen expander cycle are extensively investigated on a variety of cycle configurations. The existing and modified cycles are simulated with commercial process software (Aspen HYSYS) based on selected specifications. The results are compared in terms of thermodynamic efficiency, liquefaction capacity, and estimated size of heat exchangers. The combination of C3-MR with partial regeneration and pre-cooling of nitrogen expander cycle is recommended to have a great potential for high efficiency and large capacity.

  5. Developing A New High Capacity Anode With Long Cycle Life

    Broader source: Energy.gov (indexed) [DOE]

    more than 1000 mAhg with poor cyleability. * The formation of Sn x Co y C z and MO composite could lead to the increase in the capacity, reduce the amount of cobalt in the...

  6. Dynamics of social contagions with limited contact capacity

    E-Print Network [OSTI]

    Wang, Wei; Zhu, Yu-Xiao; Tang, Ming; Zhang, Yi-Cheng

    2015-01-01T23:59:59.000Z

    Individuals are always limited by some inelastic resources, such as time and energy, which restrict them to dedicate to social interaction and limit their contact capacity. Contact capacity plays an important role in dynamics of social contagions, which so far has eluded theoretical analysis. In this paper, we first propose a non-Markovian model to understand the effects of contact capacity on social contagions, in which each individual can only contact and transmit the information to a finite number of neighbors. We then develop a heterogeneous edge-based compartmental theory for this model, and a remarkable agreement with simulations is obtained. Through theory and simulations, we find that enlarging the contact capacity makes the network more fragile to behavior spreading. Interestingly, we find that both the continuous and discontinuous dependence of the final adoption size on the information transmission probability can arise. And there is a crossover phenomenon between the two types of dependence. More ...

  7. Fail Safe Design for Large Capacity Lithium-ion Batteries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fail Safe Design for Large Capacity Lithium-ion Batteries NREL Commercialization & Tech Transfer Webinar March 27, 2011 Gi-Heon Kim gi-heon.kim@nrel.gov John Ireland, Kyu-Jin Lee,...

  8. Why Are We Talking About Capacity Markets? (Presentation)

    SciTech Connect (OSTI)

    Milligan, M.

    2011-06-01T23:59:59.000Z

    Capacity markets represent a new and novel way to achieve greater economic use of variable generation assets such as wind and solar, and this concept is discussed in this presentation.

  9. Creative agencies : a model for building community capacity

    E-Print Network [OSTI]

    Ramaccia, Elizabeth M. (Elizabeth Marie)

    2011-01-01T23:59:59.000Z

    This research investigates how existing initiatives based in artistic and non-artistic disciplines build indigenous capacity for leadership in disenfranchised communities through the application of the creative process. ...

  10. Strategies for Sharing Bottleneck Capacity among Buses and Cars

    E-Print Network [OSTI]

    Guler, Sukran Ilgin

    2012-01-01T23:59:59.000Z

    at first, since bus-car sharing strategies for facilities ofsharing the middle links median lane between cars andfor Sharing Bottleneck Capacity among Buses and Cars by

  11. ,"New York Natural Gas Underground Storage Capacity (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    ,,"(202) 586-8800",,,"2262015 9:17:17 AM" "Back to Contents","Data 1: New York Natural Gas Underground Storage Capacity (MMcf)" "Sourcekey","N5290NY2"...

  12. An Efficient Algorithm for Computing Robust Minimum Capacity st Cuts

    E-Print Network [OSTI]

    2008-04-03T23:59:59.000Z

    Apr 3, 2008 ... under data uncertainty such as in open-pit mining or scheduling jobs on ..... maximum flow problem in that arcs e1,e2, ,ei had their capacities...

  13. "Assessment of the Adequacy of Natural Gas Pipeline Capacity...

    Broader source: Energy.gov (indexed) [DOE]

    its "Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States" report. The report is now available for downloading. In 2005-06, the Office of...

  14. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  15. Seismic Capacity of Threaded, Brazed, and Grooved Pipe Joints

    Office of Environmental Management (EM)

    SEISMIC CAPACITY OF THREADED, BRAZED AND GROOVED PIPE JOINTS Brent Gutierrez, PhD, PE George Antaki, PE, F.ASME DOE NPH Conference October 25-26, 2011 Motivation * Understand the...

  16. Evaluation of workplace air monitoring locations

    SciTech Connect (OSTI)

    Stoetzel, G.A.; Cicotte, G.R.; Lynch, T.P. (Pacific Northwest Lab., Richland, WA (United States)); Aldrich, L.K. (Westinghouse Hanford Co., Richland, WA (United States))

    1991-10-01T23:59:59.000Z

    Current federal guidance on occupational radiation protection recognizes the importance of conducting air flow studies to assist in the placement of air sampling and monitoring equipment. In support of this, Pacific Northwest Laboratory has provided technical assistance to Westinghouse Hanford Company for the purpose of evaluating the adequacy of air sampling and monitoring locations at selected Hanford facilities. Qualitative air flow studies were performed using smoke aerosols to visually determine air movement. Three examples are provided of how air flow studies results, along with information on the purpose of the air sample being collected, were used as a guide in placing the air samplers and monitors. Preparatory steps in conducting an air flow study should include: (1) identifying type of work performed in the work area including any actual or potential release points; (2) determining the amounts of radioactive material available for release and its chemical and physical form; (3) obtaining accurate work area descriptions and diagrams; (4) identifying the location of existing air samplers and monitors; (5) documenting physical and ventilation configurations; (6) notifying appropriate staff of the test; and (7) obtaining necessary equipment and supplies. The primary steps in conducting an air flow study are measurements of air velocities in the work area, release of the smoke aerosol at selected locations in the work area and the observation of air flow patterns, and finally evaluation and documentation of the results. 2 refs., 3 figs.

  17. Tracking Progress Last updated 10/7/2013 Installed Capacity 1

    E-Print Network [OSTI]

    Tracking Progress Last updated 10/7/2013 Installed Capacity 1 Installed Capacity The capacities 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Capacity (MW) Wind Solar Small Hydro Large Hydro Reporting #12;Tracking Progress Last updated 10/7/2013 Installed Capacity 2 Table 1 provides the data

  18. Tri-Laboratory Linux Capacity Cluster 2007 SOW

    SciTech Connect (OSTI)

    Seager, M

    2007-03-22T23:59:59.000Z

    The Advanced Simulation and Computing (ASC) Program (formerly know as Accelerated Strategic Computing Initiative, ASCI) has led the world in capability computing for the last ten years. Capability computing is defined as a world-class platform (in the Top10 of the Top500.org list) with scientific simulations running at scale on the platform. Example systems are ASCI Red, Blue-Pacific, Blue-Mountain, White, Q, RedStorm, and Purple. ASC applications have scaled to multiple thousands of CPUs and accomplished a long list of mission milestones on these ASC capability platforms. However, the computing demands of the ASC and Stockpile Stewardship programs also include a vast number of smaller scale runs for day-to-day simulations. Indeed, every 'hero' capability run requires many hundreds to thousands of much smaller runs in preparation and post processing activities. In addition, there are many aspects of the Stockpile Stewardship Program (SSP) that can be directly accomplished with these so-called 'capacity' calculations. The need for capacity is now so great within the program that it is increasingly difficult to allocate the computer resources required by the larger capability runs. To rectify the current 'capacity' computing resource shortfall, the ASC program has allocated a large portion of the overall ASC platforms budget to 'capacity' systems. In addition, within the next five to ten years the Life Extension Programs (LEPs) for major nuclear weapons systems must be accomplished. These LEPs and other SSP programmatic elements will further drive the need for capacity calculations and hence 'capacity' systems as well as future ASC capability calculations on 'capability' systems. To respond to this new workload analysis, the ASC program will be making a large sustained strategic investment in these capacity systems over the next ten years, starting with the United States Government Fiscal Year 2007 (GFY07). However, given the growing need for 'capability' systems as well, the budget demands are extreme and new, more cost effective ways of fielding these systems must be developed. This Tri-Laboratory Linux Capacity Cluster (TLCC) procurement represents the ASC first investment vehicle in these capacity systems. It also represents a new strategy for quickly building, fielding and integrating many Linux clusters of various sizes into classified and unclassified production service through a concept of Scalable Units (SU). The programmatic objective is to dramatically reduce the overall Total Cost of Ownership (TCO) of these 'capacity' systems relative to the best practices in Linux Cluster deployments today. This objective only makes sense in the context of these systems quickly becoming very robust and useful production clusters under the crushing load that will be inflicted on them by the ASC and SSP scientific simulation capacity workload.

  19. EIS-0463: Notice of Public Meeting Location Change | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Location Change EIS-0463: Notice of Public Meeting Location Change Presidential Permit Application for Northern Pass Transmission, New Hampshire On September 6, 2013, DOE...

  20. Optimization Online - p-facility Huff location problem on networks

    E-Print Network [OSTI]

    Rafael Blanquero

    2014-10-30T23:59:59.000Z

    Oct 30, 2014 ... Abstract: The p-facility Huff location problem aims at locating facilities on a competitive environment so as to maximize the market share.

  1. GASCAP: Wellhead Gas Productive Capacity Model documentation, June 1993

    SciTech Connect (OSTI)

    Not Available

    1993-07-01T23:59:59.000Z

    The Wellhead Gas Productive Capacity Model (GASCAP) has been developed by EIA to provide a historical analysis of the monthly productive capacity of natural gas at the wellhead and a projection of monthly capacity for 2 years into the future. The impact of drilling, oil and gas price assumptions, and demand on gas productive capacity are examined. Both gas-well gas and oil-well gas are included. Oil-well gas productive capacity is estimated separately and then combined with the gas-well gas productive capacity. This documentation report provides a general overview of the GASCAP Model, describes the underlying data base, provides technical descriptions of the component models, diagrams the system and subsystem flow, describes the equations, and provides definitions and sources of all variables used in the system. This documentation report is provided to enable users of EIA projections generated by GASCAP to understand the underlying procedures used and to replicate the models and solutions. This report should be of particular interest to those in the Congress, Federal and State agencies, industry, and the academic community, who are concerned with the future availability of natural gas.

  2. WEST VIRGINIA UNIVERSITY is the owner of all rights, title and interest in and to the following Indicia, which includes trademarks, service marks, trade names, designs, logos, seals and symbols.

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    APPENDIX B WEST VIRGINIA UNIVERSITY is the owner of all rights, title and interest: The marks of West Virginia University of are controlled under a licensing program administered Licensing Company. Yes No Restrictions WEST VIRGINIA UNIVERSITY® MOUNTAINEERS® · University seal permitted

  3. BOWLING GREEN STATE UNIVERSITY is the owner of all rights, title and interest in and to the following Indicia, which includes trademarks, service marks, trade names, designs, logos, seals and symbols.

    E-Print Network [OSTI]

    Moore, Paul A.

    APPENDIX B BOWLING GREEN STATE UNIVERSITY is the owner of all rights, title and interest 1126 BLACK WHITE RA TBD RA 2273 BLACK WHITE NOTE: The marks of Bowling Green State University University ® Bowling Green ® Bowling Green Falcons ® Bowling Green State University Falcons ® BGSU ® BGSU

  4. *Intel and the Intel logo are registered trademarks of Intel Corporation. Other brands and names are the property of their respective owners The Concurrent Collections (CnC) Parallel Programming

    E-Print Network [OSTI]

    Hazelwood, Kim

    *Intel and the Intel logo are registered trademarks of Intel Corporation. Other brands and names of their respective owners *Intel and the Intel logo are registered trademarks of Intel Corporation. Other brands *Intel and the Intel logo are registered trademarks of Intel Corporation. Other brands and names

  5. Determining the Capacity Value of Wind: An Updated Survey of Methods and Implementation; Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Porter, K.

    2008-06-01T23:59:59.000Z

    This paper summarizes state and regional studies examining the capacity value of wind energy, how different regions define and implement capacity reserve requirements, and how wind energy is defined as a capacity resource in those regions.

  6. CARBON MANAGEMENT STRATEGIES FOR U.S. ELECTRICITY GENERATION CAPACITY: A VINTAGE-BASED APPROACH

    SciTech Connect (OSTI)

    Dahowski, Robert T.; Dooley, James J.

    2004-06-01T23:59:59.000Z

    This paper examines the stock of fossil-fired power generation capacity in the United States within the context of climate change. At present, there are over 1,337 fossil-fired power generating units of at least 100 MW in capacity, that began operating between the early 1940s and today. Together these units provide some 453 GW of electric power. Launching a national program to accelerate the early retirement of this stock or tearing them down and undertaking near-term brownfield redevelopment with advanced power cycle technologies as a means of addressing their greenhouse gas emissions will not be a sensible option for all of these units. Considering a conservative 40-year operating life, there are over 667 existing fossil-fired power plants, representing a capacity of over 291 GW, that have at least a decades worth of productive life remaining. This paper draws upon specialized tools developed by Battelle to analyze the characteristics of this subset of U.S. power generation assets and explore the relationships between plant type, location, emissions, and vintage. It examines the use of retrofit carbon capture technologies, considering criteria such as the proximity of these power plants to geologic reservoirs, to assess the potential that geologic sequestration of CO2 offers these plants for managing their emissions. The average costs for retrofitting these plants and sequestering their CO2 into nearby geologic reservoirs are presented. A discussion of a set of planned U.S. fossil-fired power projects within this context is also included.

  7. Pattern Alteration: Location of Bust Fullness

    E-Print Network [OSTI]

    2006-08-04T23:59:59.000Z

    ). Figure 1. Bodice with Darts Darts should point toward the fullest part of the bust, ending ? to 1 ? inches (1 to 4 cm) from its tip. This depends on the garment style, your fi gure and personal preference. The Personal Measurement Chart (line 6) can... help you deter- mine the position of your bust point on the pattern. If your measurement and the pattern bust point location differ, you need an alteration. 1. To fi nd the bust point on a basic pattern, extend the center lines of the darts until...

  8. Location of laccase in ordered mesoporous materials

    SciTech Connect (OSTI)

    Mayoral, lvaro [Laboratorio de Microscopias Avanzadas, Instituto de Nanociencia de Aragon, Universidad de Zaragoza, Edificio I - D, Mariano Esquillor, 50018 Zaragoza (Spain); Gascn, Victoria; Blanco, Rosa M.; Mrquez-lvarez, Carlos; Daz, Isabel, E-mail: idiaz@icp.csic.es [Instituto de Catlisis y Petroleoqumica, CSIC, c/Marie Curie 2, 28049 Madrid (Spain)

    2014-11-01T23:59:59.000Z

    The functionalization with amine groups was developed on the SBA-15, and its effect in the laccase immobilization was compared with that of a Periodic Mesoporous Aminosilica. A method to encapsulate the laccase in situ has now been developed. In this work, spherical aberration (C{sub s}) corrected scanning transmission electron microscopy combined with high angle annular dark field detector and electron energy loss spectroscopy were applied to identify the exact location of the enzyme in the matrix formed by the ordered mesoporous solids.

  9. GE Global Research Locations | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMFormsGasReleaseSpeechesHall ATours,Dioxide and MethaneLocations GE

  10. Our Locations | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclear Astrophysics One ofSpeedingthisOur HistoryHistoryLocations |

  11. Pipeline capacity trading could be more efficient if{hor_ellipsis}

    SciTech Connect (OSTI)

    Roth, R.

    1995-12-31T23:59:59.000Z

    This paper discusses the efficiency of pipeline capacity trading. The characteristics of efficient markets, southwest U.S. capacity market, and a solution to excess capacity burden are discussed. It is concluded that capacity trading could be more efficient if the following were to occur: parity of capacity sales was achieved; timely reporting of EBBs of price, volume, and path was mandatory; rate caps on released capacity were removed; and market based rates are established for pipelines.

  12. Fail-Safe Design for Large Capacity Lithium-Ion Battery Systems

    SciTech Connect (OSTI)

    Kim, G. H.; Smith, K.; Ireland, J.; Pesaran, A.

    2012-07-15T23:59:59.000Z

    A fault leading to a thermal runaway in a lithium-ion battery is believed to grow over time from a latent defect. Significant efforts have been made to detect lithium-ion battery safety faults to proactively facilitate actions minimizing subsequent losses. Scaling up a battery greatly changes the thermal and electrical signals of a system developing a defect and its consequent behaviors during fault evolution. In a large-capacity system such as a battery for an electric vehicle, detecting a fault signal and confining the fault locally in the system are extremely challenging. This paper introduces a fail-safe design methodology for large-capacity lithium-ion battery systems. Analysis using an internal short circuit response model for multi-cell packs is presented that demonstrates the viability of the proposed concept for various design parameters and operating conditions. Locating a faulty cell in a multiple-cell module and determining the status of the fault's evolution can be achieved using signals easily measured from the electric terminals of the module. A methodology is introduced for electrical isolation of a faulty cell from the healthy cells in a system to prevent further electrical energy feed into the fault. Experimental demonstration is presented supporting the model results.

  13. Optimizing Geographic Allotment of Photovoltaic Capacity in a Distributed Generation Setting: Preprint

    SciTech Connect (OSTI)

    Urquhart, B.; Sengupta, M.; Keller, J.

    2012-09-01T23:59:59.000Z

    A multi-objective optimization was performed to allocate 2MW of PV among four candidate sites on the island of Lanai such that energy was maximized and variability in the form of ramp rates was minimized. This resulted in an optimal solution set which provides a range of geographic allotment alternatives for the fixed PV capacity. Within the optimal set, a tradeoff between energy produced and variability experienced was found, whereby a decrease in variability always necessitates a simultaneous decrease in energy. A design point within the optimal set was selected for study which decreased extreme ramp rates by over 50% while only decreasing annual energy generation by 3% over the maximum generation allocation. To quantify the allotment mix selected, a metric was developed, called the ramp ratio, which compares ramping magnitude when all capacity is allotted to a single location to the aggregate ramping magnitude in a distributed scenario. The ramp ratio quantifies simultaneously how much smoothing a distributed scenario would experience over single site allotment and how much a single site is being under-utilized for its ability to reduce aggregate variability. This paper creates a framework for use by cities and municipal utilities to reduce variability impacts while planning for high penetration of PV on the distribution grid.

  14. Location-Tracking Applications ecent technological advances in wireless loca-

    E-Print Network [OSTI]

    Gruteser, Marco

    areas they have visited. #12;Location-Tracking Applications broker as part of their service contract

  15. Locating a Recycling Center: The General Density Case Jannett Highfill

    E-Print Network [OSTI]

    Mou, Libin

    Locating a Recycling Center: The General Density Case Jannett Highfill Department of Economics) 677-3374. #12;2 Locating a Recycling Center: The General Density Case Abstract: The present paper considers a municipality that has a landfill (fixed in location) and plans to optimally locate a "recycling

  16. Sequence Logos, Machine/Channel Capacity, Maxwell's Demon, and Molecular Computers: a Review of the

    E-Print Network [OSTI]

    Schneider, Thomas D.

    Sequence Logos, Machine/Channel Capacity, Maxwell's Demon, and Molecular Computers: a Review. D. Schneider. Sequence logos, machine/channel capacity, Maxwell's demon, and molecular computers

  17. Plug and Process Loads Capacity and Power Requirements Analysis

    SciTech Connect (OSTI)

    Sheppy, M.; Gentile-Polese, L.

    2014-09-01T23:59:59.000Z

    This report addresses gaps in actionable knowledge that would help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. Limited initial data, however, suggest that actual PPL densities in leased buildings are substantially lower. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems. Better guidance will enable improved sizing and design of these systems, decrease upfront capital costs, and allow systems to operate more energy efficiently. The main focus of this report is to provide industry with reliable, objective third-party guidance to address the information gap in typical PPL densities for commercial building tenants. This could drive changes in negotiations about PPL energy demands.

  18. Locating hardware faults in a parallel computer

    DOE Patents [OSTI]

    Archer, Charles J.; Megerian, Mark G.; Ratterman, Joseph D.; Smith, Brian E.

    2010-04-13T23:59:59.000Z

    Locating hardware faults in a parallel computer, including defining within a tree network of the parallel computer two or more sets of non-overlapping test levels of compute nodes of the network that together include all the data communications links of the network, each non-overlapping test level comprising two or more adjacent tiers of the tree; defining test cells within each non-overlapping test level, each test cell comprising a subtree of the tree including a subtree root compute node and all descendant compute nodes of the subtree root compute node within a non-overlapping test level; performing, separately on each set of non-overlapping test levels, an uplink test on all test cells in a set of non-overlapping test levels; and performing, separately from the uplink tests and separately on each set of non-overlapping test levels, a downlink test on all test cells in a set of non-overlapping test levels.

  19. Location Independent Professional Project: A Pilot Study

    SciTech Connect (OSTI)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01T23:59:59.000Z

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  20. Overview of Opportunities for Co-Location of Solar Energy Technologies and Vegetation

    SciTech Connect (OSTI)

    Macknick, J.; Beatty, B.; Hill, G.

    2013-12-01T23:59:59.000Z

    Large-scale solar facilities have the potential to contribute significantly to national electricity production. Many solar installations are large-scale or utility-scale, with a capacity over 1 MW and connected directly to the electric grid. Large-scale solar facilities offer an opportunity to achieve economies of scale in solar deployment, yet there have been concerns about the amount of land required for solar projects and the impact of solar projects on local habitat. During the site preparation phase for utility-scale solar facilities, developers often grade land and remove all vegetation to minimize installation and operational costs, prevent plants from shading panels, and minimize potential fire or wildlife risks. However, the common site preparation practice of removing vegetation can be avoided in certain circumstances, and there have been successful examples where solar facilities have been co-located with agricultural operations or have native vegetation growing beneath the panels. In this study we outline some of the impacts that large-scale solar facilities can have on the local environment, provide examples of installations where impacts have been minimized through co-location with vegetation, characterize the types of co-location, and give an overview of the potential benefits from co-location of solar energy projects and vegetation. The varieties of co-location can be replicated or modified for site-specific use at other solar energy installations around the world. We conclude with opportunities to improve upon our understanding of ways to reduce the environmental impacts of large-scale solar installations.

  1. Additivity of Entangled Channel Capacity for Quantum Input States

    E-Print Network [OSTI]

    V. P. Belavkin; X. Dai

    2007-02-10T23:59:59.000Z

    An elementary introduction into algebraic approach to unified quantum information theory and operational approach to quantum entanglement as generalized encoding is given. After introducing compound quantum state and two types of informational divergences, namely, Araki-Umegaki (a-type) and of Belavkin-Staszewski (b-type) quantum relative entropic information, this paper treats two types of quantum mutual information via entanglement and defines two types of corresponding quantum channel capacities as the supremum via the generalized encodings. It proves the additivity property of quantum channel capacities via entanglement, which extends the earlier results of V. P. Belavkin to products of arbitrary quantum channels for quantum relative entropy of any type.

  2. World nuclear capacity and fuel cycle requirements, November 1993

    SciTech Connect (OSTI)

    Not Available

    1993-11-30T23:59:59.000Z

    This analysis report presents the current status and projections of nuclear capacity, generation, and fuel cycle requirements for all countries in the world using nuclear power to generate electricity for commercial use. Long-term projections of US nuclear capacity, generation, fuel cycle requirements, and spent fuel discharges for three different scenarios through 2030 are provided in support of the Department of Energy`s activities pertaining to the Nuclear Waste Policy Act of 1982 (as amended in 1987). The projections of uranium requirements also support the Energy Information Administration`s annual report, Domestic Uranium Mining and Milling Industry: Viability Assessment.

  3. Method of increasing the sulfation capacity of alkaline earth sorbents

    DOE Patents [OSTI]

    Shearer, J.A.; Turner, C.B.; Johnson, I.

    1980-03-13T23:59:59.000Z

    A system and method for increasing the sulfation capacity of alkaline earth carbonates to scrub sulfur dioxide produced during the fluidized bed combustion of coal in which partially sulfated alkaline earth carbonates are hydrated in a fluidized bed to crack the sulfate coating and convert the alkaline earth oxide to the hydroxide. Subsequent dehydration of the sulfate-hydroxide to a sulfate-oxide particle produces particles having larger pore size, increased porosity, decreased grain size and additional sulfation capacity. A continuous process is disclosed.

  4. On the heat capacity of Ce{sub 3}Al

    SciTech Connect (OSTI)

    Singh, Durgesh, E-mail: durgeshkushinagar@gmail.com; Samatham, S. Shanmukharao, E-mail: durgeshkushinagar@gmail.com; Venkateshwarlu, D., E-mail: durgeshkushinagar@gmail.com; Gangrade, Mohan, E-mail: durgeshkushinagar@gmail.com; Ganesan, V., E-mail: durgeshkushinagar@gmail.com [UGC-DAE Consortium for Scientific Research, University Campus, Khandwa Road, Indore-452001, Madhya Pradesh (India)

    2014-04-24T23:59:59.000Z

    Electrical resistivity and heat capacity measurements on Cerium based dense Kondo compound Ce{sub 3}Al have been reported. Clear signatures of first order structural transition at 108K, followed by a Kondo minimum and coherence are clearly seen in resistivity. The structural transition is robust and is not affected by magnetic fields. Heat capacity measurements reveal an anomalous enhancement in the heavy fermion character upon magnetic fields. Vollhardt invariance in specific heat C(T.H) curves have been observed at T=3.7K and at H ? 6T.

  5. MobiEyes: A Distributed Location Monitoring Service Using Moving Location Queries

    E-Print Network [OSTI]

    Liu, Ling

    , distributed algorithms, mobile data management. 1 INTRODUCTION WITH the growing availability of mobile-sensitive resource management. The former uses location data to tailor the information delivered to the mobile users traffic and weather. Examples include systems for fleet manage- ment, mobile workforce management

  6. Fault Locating, Prediction and Protection (FLPPS)

    SciTech Connect (OSTI)

    Yinger, Robert, J.; Venkata, S., S.; Centeno, Virgilio

    2010-09-30T23:59:59.000Z

    One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, hi

  7. Accuracy of Link Capacity Estimates using Passive and Active Approaches with CapProbe

    E-Print Network [OSTI]

    Chen, Ling-Jyh

    appropriate streaming rates, while ISPs would be able to determine the capacity of their installed linksAccuracy of Link Capacity Estimates using Passive and Active Approaches with CapProbe Rohit Kapoor to estimate capacity. CapProbe combines both dispersion and end-to-end delay to estimate the capacity

  8. Tacit collusion in a non-repeated price competition game with a soft capacity constraint

    E-Print Network [OSTI]

    cost function. Key words: price competition, tacit collusion, convex cost, Bertrand Para- dox, capacity

  9. 1. Theory for Liquid Heat Capacity I ) Polynomial equation (HC_CPLEQN)

    E-Print Network [OSTI]

    Hong, Deog Ki

    1. Theory for Liquid Heat Capacity I ) Polynomial equation (HC_CPLEQN) Polynomial equation is usedJ/kg-mol.K. II ) Corresponding States Method for Liquid Heat Capacity (HC_CPLCSP) The expression basedGraw-Hill, New York, 2000 2. KDB Routines for Liquid Heat Capacity Calculation KDB liquid heat capacity

  10. High Capacity Li Ion Battery Anodes Using Ge Nanowires

    E-Print Network [OSTI]

    Cui, Yi

    High Capacity Li Ion Battery Anodes Using Ge Nanowires Candace K. Chan, Xiao Feng Zhang, and Yi Cui efficiency > 99%. Structural characterization revealed that the Ge nanowires remain intact and connected nanowire anodes are promising candidates for the development of high-energy-density lithium batteries

  11. Determining the People Capacity of a Structure May 7, 1999

    E-Print Network [OSTI]

    Mitchener, W. Garrett

    sustaining injury? Another important issue is that of comfort: how many people can be #12;t in a room, during, in an overcrowded room, might leave many people injured in the rush to exit whether or not the threat is realTeam 243 Determining the People Capacity of a Structure Team 243 May 7, 1999 1 Introduction

  12. Spent nuclear fuel project design basis capacity study

    SciTech Connect (OSTI)

    Cleveland, K.J.

    1996-09-09T23:59:59.000Z

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  13. Assessing the Control Systems Capacity for Demand Response in

    E-Print Network [OSTI]

    LBNL-5319E Assessing the Control Systems Capacity for Demand Response in California Industries in this report was coordinated by the Demand Response Research Center and funded by the California Energy of the Demand Response Research Center Industrial Controls Experts Working Group: · Jim Filanc, Southern

  14. Wind Farm Portfolio Optimization under Network Capacity Constraints

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    1 Wind Farm Portfolio Optimization under Network Capacity Constraints Hel`ene Le Cadre, Anthony of wind farms in a Market Coupling organization, for two Market Designs (exogenous prices and endogenous of efficient wind farm portfolios, is derived theoretically as a function of the number of wind farms

  15. Power Control and Capacity of Spread Spectrum Wireless Networks

    E-Print Network [OSTI]

    Tse, David

    Power Control and Capacity of Spread Spectrum Wireless Networks S.V. Hanly a;1 , and D.N. Tse b;2, there has been signif icant research in the area in recent years. While power control has been considered questions about optimal power control as well as the problem of charac terizing the resulting network

  16. Effect of Mobility on Power Control and System Capacity

    E-Print Network [OSTI]

    Kumar, Anurag

    Effect of Mobility on Power Control and System Capacity in CDMA Cellular Wireless Networks Munish control, admission control and user mobility. We compare two methods for power control: Constant Re ceived Power Control (CRPC) in which the total power received at each base station (BS) is kept constant

  17. Energy-Efficient Dynamic Capacity Provisioning in Server Farms

    E-Print Network [OSTI]

    Harchol-Balter, Mor

    Energy-Efficient Dynamic Capacity Provisioning in Server Farms Anshul Gandhi Varun Gupta Mor, either expressed or implied, of NSF. #12;Keywords: Server farms, Power management, Queueing theory #12;Abstract A central question in designing server farms today is how to efficiently provision the number

  18. High capacity nickel battery material doped with alkali metal cations

    DOE Patents [OSTI]

    Jackovitz, John F. (Monroeville, PA); Pantier, Earl A. (Penn Hills, PA)

    1982-05-18T23:59:59.000Z

    A high capacity battery material is made, consisting essentially of hydrated Ni(II) hydroxide, and about 5 wt. % to about 40 wt. % of Ni(IV) hydrated oxide interlayer doped with alkali metal cations selected from potassium, sodium and lithium cations.

  19. Capacities and Research in Homeland Security The University at Buffalo

    E-Print Network [OSTI]

    Krovi, Venkat

    , and Biophotonics (ILPB) and the Center for Spin Effects and Quantum Information in Nanostructures (CSEQuIN) conduct multidisciplinary science and technology programs focusing on the development of: (1) high capacity data storage devices for "smart sensor" systems to detect biological and chemical agents. These research directions

  20. The Capacity Loss of Dense Constellations Tobias Koch

    E-Print Network [OSTI]

    high SNR, our results recover the power loss of 1.53dB for square signal constellations without-noise channels for suitably high signal- to-noise ratio. Our expression for the capacity loss recovers the power loss of 1.53dB for square signal constellations. I. INTRODUCTION As it is well known, the channel

  1. TRENDS IN ELECTRICITY CONSUMPTION, PEAK DEMAND, AND GENERATING CAPACITY IN

    E-Print Network [OSTI]

    California at Berkeley. University of

    PWP-085 TRENDS IN ELECTRICITY CONSUMPTION, PEAK DEMAND, AND GENERATING CAPACITY IN CALIFORNIA, California 94720-5180 www.ucei.org #12;TRENDS IN ELECTRICITY CONSUMPTION, PEAK DEMAND, AND GENERATING** Abstract This study analyzes state and regional electricity supply and demand trends for the eleven states

  2. Dynamic Energy-Aware Capacity Provisioning for Cloud Computing Environments

    E-Print Network [OSTI]

    Boutaba, Raouf

    reduction in energy cost, while maintaining an acceptable average scheduling delay for individual tasksDynamic Energy-Aware Capacity Provisioning for Cloud Computing Environments Qi Zhang University by amortizing initial capital investment over large number of machines, they also incur tremendous energy cost

  3. A CAUTIONARY NOTE REGARDING THE DATA INTEGRITY CAPACITY

    E-Print Network [OSTI]

    Irvine, Cynthia E.

    assurance components, as well as the integrity of data read from high assurance repositories and displayedA CAUTIONARY NOTE REGARDING THE DATA INTEGRITY CAPACITY OF CERTAIN SECURE SYSTEMS Cynthia E. Irvine of architecture. We discuss the general integrity property that systems can only be trusted to manage modi able

  4. Capacity-aware back-pressure traffic signal control

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    load, one must wonder whether the network is used at its maximum capacity. Vehicle automation is expected to enable much more precise and intelligent coordination between vehicles, possibly reducing congestion [1]. However, automated cars are not currently ready for large commercial deployment. Human

  5. On the Throughput Capacity of Heterogeneous Wireless Networks

    E-Print Network [OSTI]

    Latchman, Haniph A.

    On the Throughput Capacity of Heterogeneous Wireless Networks Pan Li, Member, IEEE, and Yuguang of wireless networks. However, it is commonly assumed that all nodes in the network are identical. The issue of heterogeneous wireless networks with general network settings. Specifically, we consider an extended network

  6. Solar Photovoltaic Capacity F t P f d P li

    E-Print Network [OSTI]

    6/19/2013 1 Solar Photovoltaic Capacity F t P f d P li Generating Resources Advisory Committee Advisor Model (SAM), version 2013.1.15 Technology: Solar PV (PVWatts system model)Technology: Solar PV (MWh) (First year output, each year thereafter degrades 0.5%) 6 #12;6/19/2013 4 Shape of PNW Solar PV

  7. Lecture Ch. 2a Energy and heat capacity

    E-Print Network [OSTI]

    Russell, Lynn

    machine! Conservation of energy! Definition of energy! Uniqueness of work values! Q = 0,W = 0 ! "E = 0 ! E1 Lecture Ch. 2a Energy and heat capacity State functions or exact differentials Internal energy vs. enthalpy 1st Law of thermodynamics Relate heat, work, energy Heat/work cycles (and path

  8. Lecture Ch. 2a Energy and heat capacity

    E-Print Network [OSTI]

    Russell, Lynn

    of energy Definition of energy Uniqueness of work values Q = 0,W = 0 E = 0 E2 = E1 Q = 0 E = W Wrev1 Lecture Ch. 2a Energy and heat capacity State functions or exact differentials Internal energy vs. enthalpy 1st Law of thermodynamics Relate heat, work, energy Heat/work cycles (and path

  9. Linear Codes, Target Function Classes, and Network Computing Capacity

    E-Print Network [OSTI]

    Franceschetti, Massimo

    Linear Codes, Target Function Classes, and Network Computing Capacity Rathinakumar Appuswamy Submitted: May 6, 2011 Abstract We study the use of linear codes for network computing in single in network coding are applicable to network computing as well. Network computing problems arise in various

  10. : Measurement of Battery Capacity in Mobile Robot Systems

    E-Print Network [OSTI]

    Breu, Ruth

    . These enhancements pose demanding operation conditions on the battery, emphasizing the importance of this com- ponentRoBM2 : Measurement of Battery Capacity in Mobile Robot Systems Nestor Lucas1 , Cosmin Codrea1. With battery driven robot systems performing very sophisti- cated tasks, increasing demands on the power supply

  11. COMMUNITY CAPACITY BUILDING FOR REVITALIZATION AND SUSTAINABLE REDEVELOPMENT

    SciTech Connect (OSTI)

    Downing, Melinda; Rosenthall, John; Hudson, Michelle

    2003-02-27T23:59:59.000Z

    Capacity building programs help poor and disadvantaged communities to improve their ability to participate in the environmental decision-making processes. They encourage citizen involvement, and provide the tools that enable them to do so. Capacity building enables communities that would otherwise be excluded to participate in the process, leading to better, and more just decisions. The Department of Energy (DOE) continues to be committed to promoting environmental justice and involving its stakeholders more directly in the planning and decision-making process for environmental cleanup. DOE's Environmental Management Program (EM) is in full support of this commitment. Through its environmental justice project, EM provides communities with the capacity to effectively contribute to a complex technical decision-making process by furnishing access to computers, the Internet, training and technical assistance. DOE's Dr. Samuel P. Massie Chairs of Excellence Program (Massie Chairs) function as technical advisors to many of these community projects. The Massie Chairs consist of nationally and internationally recognized engineers and scientists from nine Historically Black Colleges and Universities (HBCUs) and one Hispanic Serving Institution (HIS). This paper will discuss capacity building initiatives in various jurisdictions.

  12. How Mobility Increases Mobile Cloud Computing Processing Capacity

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    How Mobility Increases Mobile Cloud Computing Processing Capacity Anh-Dung Nguyen, Patrick S--In this paper, we address a important and still unanswered question in mobile cloud computing "how mobility the resilience of mobile cloud computing services. Keywords--Mobile cloud computing, mobility, quality of service

  13. Capacity planning in a transitional economy: What issues? Which models?

    SciTech Connect (OSTI)

    Mubayi, V.; Leigh, R.W. [Brookhaven National Lab., Upton, NY (United States); Bright, R.N. [Anylec Research, Inc., Bayport, NY (United States)

    1996-03-01T23:59:59.000Z

    This paper is devoted to an exploration of the important issues facing the Russian power generation system and its evolution in the foreseeable future and the kinds of modeling approaches that capture those issues. These issues include, for example, (1) trade-offs between investments in upgrading and refurbishment of existing thermal (fossil-fired) capacity and safety enhancements in existing nuclear capacity versus investment in new capacity, (2) trade-offs between investment in completing unfinished (under construction) projects based on their original design versus investment in new capacity with improved design, (3) incorporation of demand-side management options (investments in enhancing end-use efficiency, for example) within the planning framework, (4) consideration of the spatial dimensions of system planning including investments in upgrading electric transmission networks or fuel shipment networks and incorporating hydroelectric generation, (5) incorporation of environmental constraints and (6) assessment of uncertainty and evaluation of downside risk. Models for exploring these issues include low power shutdown (LPS) which are computationally very efficient, though approximate, and can be used to perform extensive sensitivity analyses to more complex models which can provide more detailed answers but are computationally cumbersome and can only deal with limited issues. The paper discusses which models can usefully treat a wide range of issues within the priorities facing decision makers in the Russian power sector and integrate the results with investment decisions in the wider economy.

  14. Optimal Demand Response Capacity of Automatic Lighting Control

    E-Print Network [OSTI]

    Mohsenian-Rad, Hamed

    . To remedy this problem, different demand side management programs have been proposed to shape the energy prior studies have extensively studied the capacity of offering demand response in buildings and office buildings. Keywords: Demand response, automatic lighting control, commercial and office buildings

  15. DHC: a diurnal heat capacity program for microcomputers

    SciTech Connect (OSTI)

    Balcomb, J.D.

    1985-01-01T23:59:59.000Z

    A computer program has been developed that can predict the temperature swing in direct gain passive solar buildings. The diurnal heat capacity (DHC) program calculates the DHC for any combination of homogeneous or layered surfaces using closed-form harmonic solutions to the heat diffusion equation. The theory is described, a Basic program listing is provided, and an example solution printout is given.

  16. Homodyne impulse radar hidden object locator

    DOE Patents [OSTI]

    McEwan, T.E.

    1996-04-30T23:59:59.000Z

    An electromagnetic detector is designed to locate an object hidden behind a separator or a cavity within a solid object. The detector includes a PRF generator for generating 2 MHz pulses, a homodyne oscillator for generating a 2 kHz square wave, and for modulating the pulses from the PRF generator. A transmit antenna transmits the modulated pulses through the separator, and a receive antenna receives the signals reflected off the object. The receiver path of the detector includes a sample and hold circuit, an AC coupled amplifier which filters out DC bias level shifts in the sample and hold circuit, and a rectifier circuit connected to the homodyne oscillator and to the AC coupled amplifier, for synchronously rectifying the modulated pulses transmitted over the transmit antenna. The homodyne oscillator modulates the signal from the PRF generator with a continuous wave (CW) signal, and the AC coupled amplifier operates with a passband centered on that CW signal. The present detector can be used in several applications, including the detection of metallic and non-metallic objects, such as pipes, studs, joists, nails, rebars, conduits and electrical wiring, behind wood wall, ceiling, plywood, particle board, dense hardwood, masonry and cement structure. The detector is portable, light weight, simple to use, inexpensive, and has a low power emission which facilitates the compliance with Part 15 of the FCC rules. 15 figs.

  17. Borehole locations on seven interior salt domes

    SciTech Connect (OSTI)

    Simcox, A.C.; Wampler, S.L.

    1982-08-01T23:59:59.000Z

    This report is designed as an inventory of all wells known to have been drilled within a five-mile radius of each of seven salt domes within the Interior Salt Basin in east Texas, northern Louisiana and Mississippi. There are 72 boreholes that entered salt above an elevation of -3000 feet mean sea level. For these, details of location, drilling dates, depth of casing and cement, elevation of top of caprock and salt, etc., are given on tables in the appendix. Of the seven domes, Oakwood has the largest number of boreholes, thirty-eight (including two sidetracked wells) that enter the salt stock above -3000 feet mean sea level; another dome in northeast Texas, Keechi, has eight; in northern Louisiana, Rayburn's has four and Vacherie has five; in southern Mississippi, Cypress Creek has seven, Lampton has one, and Richton has nine. In addition, all wells known outside the supra-domal area, but within a five-mile radius of the center of the 7 domes are separately catalogued.

  18. SAPLE: Sandia Advanced Personnel Locator Engine.

    SciTech Connect (OSTI)

    Procopio, Michael J.

    2010-04-01T23:59:59.000Z

    We present the Sandia Advanced Personnel Locator Engine (SAPLE) web application, a directory search application for use by Sandia National Laboratories personnel. SAPLE's purpose is to return Sandia personnel 'results' as a function of user search queries, with its mission to make it easier and faster to find people at Sandia. To accomplish this, SAPLE breaks from more traditional directory application approaches by aiming to return the correct set of results while placing minimal constraints on the user's query. Two key features form the core of SAPLE: advanced search query interpretation and inexact string matching. SAPLE's query interpretation permits the user to perform compound queries when typing into a single search field; where able, SAPLE infers the type of field that the user intends to search on based on the value of the search term. SAPLE's inexact string matching feature yields a high-quality ranking of personnel search results even when there are no exact matches to the user's query. This paper explores these two key features, describing in detail the architecture and operation of SAPLE. Finally, an extensive analysis on logged search query data taken from an 11-week sample period is presented.

  19. Homodyne impulse radar hidden object locator

    DOE Patents [OSTI]

    McEwan, Thomas E. (Livermore, CA)

    1996-01-01T23:59:59.000Z

    An electromagnetic detector is designed to locate an object hidden behind a separator or a cavity within a solid object. The detector includes a PRF generator for generating 2 MHz pulses, a homodyne oscillator for generating a 2 kHz square wave, and for modulating the pulses from the PRF generator. A transmit antenna transmits the modulated pulses through the separator, and a receive antenna receives the signals reflected off the object. The receiver path of the detector includes a sample and hold circuit, an AC coupled amplifier which filters out DC bias level shifts in the sample and hold circuit, and a rectifier circuit connected to the homodyne oscillator and to the AC coupled amplifier, for synchronously rectifying the modulated pulses transmitted over the transmit antenna. The homodyne oscillator modulates the signal from the PRF generator with a continuous wave (CW) signal, and the AC coupled amplifier operates with a passband centered on that CW signal. The present detector can be used in several applications, including the detection of metallic and non-metallic objects, such as pipes, studs, joists, nails, rebars, conduits and electrical wiring, behind wood wall, ceiling, plywood, particle board, dense hardwood, masonry and cement structure. The detector is portable, light weight, simple to use, inexpensive, and has a low power emission which facilitates the compliance with Part 15 of the FCC rules.

  20. Etherthreads : an infrastructure for location-based messages

    E-Print Network [OSTI]

    Lassey, Bradford, 1980-

    2004-01-01T23:59:59.000Z

    This thesis proposes an infrastructure for location-based services for Bluetooth enabled cellular phones. Specifically, it explores the use of this architecture in a location-based messaging application. A user can send ...

  1. Provable and practical location privacy for vehicular and mobile systems

    E-Print Network [OSTI]

    Popa, Raluca Ada

    2010-01-01T23:59:59.000Z

    In recent years, there has been a rapid evolution of location-based vehicular and mobile services (e.g., electronic tolling, congestion pricing, traffic statistics, insurance pricing, location-based social applications), ...

  2. A unified Bayesian framework for relative microseismic location

    E-Print Network [OSTI]

    Poliannikov, Oleg V.

    We study the problem of determining an unknown microseismic event location relative to previously located events using a single monitoring array in a monitoring well. We show that using the available information about the ...

  3. A unified Bayesian framework for relative microseismic location

    E-Print Network [OSTI]

    Poliannikov, Oleg V.

    2013-01-01T23:59:59.000Z

    We study the problem of determining an unknown microseismic event location relative to previously located events using a single monitoring array in a monitoring well. We show that using the available information about the ...

  4. Holdout transshipment policy in two-location inventory systems

    E-Print Network [OSTI]

    Zhang, Jiaqi

    2009-01-01T23:59:59.000Z

    In two-location inventory systems, unidirectional transshipment policies are considered when an item is not routinely stocked at a location in the system. Unlike the past research in this area which has concentrated on ...

  5. Policy-aware sender anonymity in Location-based services

    E-Print Network [OSTI]

    Vyas, Avinash

    2011-01-01T23:59:59.000Z

    LBS Server Location Server CSP Sender Figure 1.1: LBS ModelService Provider, denoted as CSP, the Location Server,is either the MPC in the CSPs network or an Over-The-Top (

  6. Locating a semi-obnoxious facility with repelling polygonal regions

    E-Print Network [OSTI]

    2007-04-30T23:59:59.000Z

    Apr 30, 2007 ... Page 1 ... For the last years, the location of semi-desirable facilities has been a widely studied topic by the researchers in location theory (see [1...

  7. Risks of using AP locations discovered through war driving

    E-Print Network [OSTI]

    Kotz, David

    Risks of using AP locations discovered through war driving Minkyong Kim, Jeffrey J. Fielding the actual locations are often unavailable, they use estimated locations from war driving estimated through war driving. War driving is the process of collecting Wi-Fi beacons by driving or walking

  8. Accurate Eye Center Location through Invariant Isocentric Patterns

    E-Print Network [OSTI]

    Gevers, Theo

    1 Accurate Eye Center Location through Invariant Isocentric Patterns Roberto Valenti, Student Member, IEEE, and Theo Gevers, Member, IEEE, Abstract--Locating the center of the eyes allows for valuable information to be captured and used in a wide range of applications. Accurate eye center location

  9. and privatize the THSR project. Privatization was a way to introduce the private owner's financial and management capabilities into a tra-

    E-Print Network [OSTI]

    Barkan, Christopher P.L.

    . The construction of a high-capacity HSR sys- tem to serve the country's transportation needs became the only viable consumption, and low levels of pollution, high-speed rail (HSR) is emerging as an attractive transportation-sponsored HSR project such as KHSR could successfully promote the national HSR industry. With the world's oil

  10. Carbon Dioxide Sealing Capacity: Textural or Compositional Controls?

    SciTech Connect (OSTI)

    Cranganu, Constantin; Soleymani, Hamidreza; Sadiqua, Soleymani; Watson, Kieva

    2013-11-30T23:59:59.000Z

    This research project is aiming to assess the carbon dioxide sealing capacity of most common seal-rocks, such as shales and non-fractured limestones, by analyzing the role of textural and compositional parameters of those rocks. We hypothesize that sealing capacity is controlled by textural and/or compositional pa-rameters of caprocks. In this research, we seek to evaluate the importance of textural and compositional parameters affecting the sealing capacity of caprocks. The conceptu-al framework involves two testable end-member hypotheses concerning the sealing ca-pacity of carbon dioxide reservoir caprocks. Better understanding of the elements controlling sealing quality will advance our knowledge regarding the sealing capacity of shales and carbonates. Due to relatively low permeability, shale and non-fractured carbonate units are considered relatively imper-meable formations which can retard reservoir fluid flow by forming high capillary pres-sure. Similarly, these unites can constitute reliable seals for carbon dioxide capture and sequestration purposes. This project is a part of the comprehensive project with the final aim of studying the caprock sealing properties and the relationship between microscopic and macroscopic characteristics of seal rocks in depleted gas fields of Oklahoma Pan-handle. Through this study we examined various seal rock characteristics to infer about their respective effects on sealing capacity in special case of replacing reservoir fluid with super critical carbon dioxide (scCO{sub 2}). To assess the effect of textural and compositional properties on scCO{sub 2} maximum reten-tion column height we collected 30 representative core samples in caprock formations in three counties (Cimarron, Texas, Beaver) in Oklahoma Panhandle. Core samples were collected from various seal formations (e.g., Cherokee, Keys, Morrowan) at different depths. We studied the compositional and textural properties of the core samples using several techniques. Mercury Injection Porosimetry (MIP), Scanning Electron Microsco-py SEM, and Sedigraph measurements are used to assess the pore-throat-size distribu-tion, sorting, texture, and grain size of the samples. Also, displacement pressure at 10% mercury saturation (Pd) and graphically derived threshold pressure (Pc) were deter-mined by MIP technique. SEM images were used for qualitative study of the minerals and pores texture of the core samples. Moreover, EDS (Energy Dispersive X-Ray Spec-trometer), BET specific surface area, and Total Organic Carbon (TOC) measurements were performed to study various parameters and their possible effects on sealing capaci-ty of the samples. We found that shales have the relatively higher average sealing threshold pressure (Pc) than carbonate and sandstone samples. Based on these observations, shale formations could be considered as a promising caprock in terms of retarding scCO{sub 2} flow and leak-age into above formations. We hypothesized that certain characteristics of shales (e.g., 3 fine pore size, pore size distribution, high specific surface area, and strong physical chemical interaction between wetting phase and mineral surface) make them an effi-cient caprock for sealing super critical CO{sub 2}. We found that the displacement pressure at 10% mercury saturation could not be the ultimate representative of the sealing capacity of the rock sample. On the other hand, we believe that graphical method, introduced by Cranganu (2004) is a better indicator of the true sealing capacity. Based on statistical analysis of our samples from Oklahoma Panhandle we assessed the effects of each group of properties (textural and compositional) on maximum supercriti-cal CO{sub 2} height that can be hold by the caprock. We conclude that there is a relatively strong positive relationship (+.40 to +.69) between supercritical CO{sub 2} column height based on Pc and hard/ soft mineral content index (ratio of minerals with Mohs hardness more than 5 over minerals with Mohs hardness less than 5) in both shales and limestone samples. Average median pore rad

  11. Natural vegetation at the proposed Reference Repository Location in southeastern Washington

    SciTech Connect (OSTI)

    Rickard, W.H.

    1988-02-01T23:59:59.000Z

    The dominant shrubs were sagebrush and spiny hopsage; the herbs were dominated by cheatgrass and Sandberg bluegrass. Spiny hopsage appeared to be vulnerable to burning and also to damage by off-road vehicular traffic. It appears to have little or no ability to reproduce through seedlings; once the existing plants are killed they are not likely to be replaced, even if seed-producing plants are nearby. The only pure stand of spiny hopsage known to exist on the Hanford Site is on and near study plot 2H. Sagebrush, like spiny hopsage, is killed by burning and by heavy vehicles. Sagebrush is capable of reproducing via seeds, indicating that it is an inherently aggressive species with a capacity to reestablish itself if parent plants are in the vicinity to act as seed sources. Alien, annual plants, especially cheatgrass, were a major contributor to the herbaceous canopy cover in plots 3S, 4S, and 5S. However, native perennial grasses, especially Sandberg bluegrass, were a major contributor to the canopy cover in plots 1S and 2H. These differences are probably caused by differences in soil properties (e.g., water retention capacity), rather than to historical disturbances such as livestock grazing or wildfire. Specimens of Sandwort, Arenaria franklinii, growing near the Reference Repository Location were collected for examination by taxonomists to determine if the specimens are of the variety A. f. thompsonii, a taxon currently listed as threatened in the state of Washington. 16 refs., 7 figs., 3 tabs.

  12. Radiation damage in the LHCb Vertex Locator

    E-Print Network [OSTI]

    A. Affolder; K. Akiba; M. Alexander; S. Ali; M. Artuso; J. Benton; M. van Beuzekom; P. M. Bj\\ornstad; G. Bogdanova; S. Borghi; T. J. V. Bowcock; H. Brown; J. Buytaert; G. Casse; P. Collins; S. De Capua; D. Dossett; L. Eklund; C. Farinelli; J. Garofoli; M. Gersabeck; T. Gershon; H. Gordon; J. Harrison; V. Heijne; K. Hennessy; D. Hutchcroft; E. Jans; M. John; T. Ketel; G. Lafferty; T. Latham; A. Leflat; M. Liles; D. Moran; I. Mous; A. Oblakowska-Mucha; C. Parkes; G. D. Patel; S. Redford; M. M. Reid; K. Rinnert; E. Rodrigues; M. Schiller; T. Szumlak; C. Thomas; J. Velthuis; V. Volkov; A. D. Webber; M. Whitehead; E. Zverev

    2013-02-21T23:59:59.000Z

    The LHCb Vertex Locator (VELO) is a silicon strip detector designed to reconstruct charged particle trajectories and vertices produced at the LHCb interaction region. During the first two years of data collection, the 84 VELO sensors have been exposed to a range of fluences up to a maximum value of approximately $\\rm{45 \\times 10^{12}\\,1\\,MeV}$ neutron equivalent ($\\rm{1\\,MeV\\,n_{eq}}$). At the operational sensor temperature of approximately $-7\\,^{\\circ}\\rm{C}$, the average rate of sensor current increase is $18\\,\\upmu\\rm{A}$ per $\\rm{fb^{-1}}$, in excellent agreement with predictions. The silicon effective bandgap has been determined using current versus temperature scan data after irradiation, with an average value of $E_{g}=1.16\\pm0.03\\pm0.04\\,\\rm{eV}$ obtained. The first observation of n-on-n sensor type inversion at the LHC has been made, occurring at a fluence of around $15 \\times 10 ^{12}$ of $1\\,\\rm{MeV\\,n_{eq}}$. The only n-on-p sensors in use at the LHC have also been studied. With an initial fluence of approximately $\\rm{3 \\times 10^{12}\\,1\\,MeV\\,n_{eq}}$, a decrease in the Effective Depletion Voltage (EDV) of around 25\\,V is observed, attributed to oxygen induced removal of boron interstitial sites. Following this initial decrease, the EDV increases at a comparable rate to the type inverted n-on-n type sensors, with rates of $(1.43\\pm 0.16) \\times 10 ^{-12}\\,\\rm{V} / \\, 1 \\, \\rm{MeV\\,n_{eq}}$ and $(1.35\\pm 0.25) \\times 10 ^{-12}\\,\\rm{V} / \\, 1 \\, \\rm{MeV\\,n_{eq}}$ measured for n-on-p and n-on-n type sensors, respectively. A reduction in the charge collection efficiency due to an unexpected effect involving the second metal layer readout lines is observed.

  13. MISO Capacity with Per-Antenna Power Constraint

    E-Print Network [OSTI]

    Vu, Mai

    2010-01-01T23:59:59.000Z

    We establish in closed-form the capacity and the optimal signaling scheme for a MISO channel with per-antenna power constraint. Two cases of channel state information are considered: constant channel known at both the transmitter and receiver, and Rayleigh fading channel known only at the receiver. For the first case, the optimal signaling scheme is beamforming with the phases of the beam weights matched to the phases of the channel coefficients, but the amplitudes independent of the channel coefficients and dependent only on the constrained powers. For the second case, the optimal scheme is to send independent signals from the antennas with the constrained powers. In both cases, the capacity with per-antenna power constraint is usually less than that with sum power constraint.

  14. Great Lakes ports coal handling capacity and export coal potential

    SciTech Connect (OSTI)

    Ames, A.H. Jr.

    1981-02-01T23:59:59.000Z

    This study was developed to determine the competitive position of the Great Lakes Region coal-loading ports in relation to other US coastal ranges. Due to the congestion at some US Atlantic coastal ports US coal producers have indicated a need for alternative export routes, including the Great Lakes-St. Lawrence Seaway System. The study assesses the regions coal handling capacity and price competitiveness along with the opportunity for increased US flag vessel service. A number of appendices are included showing major coal producers, railroad marketing representatives, US vessel operators, and port handling capacities and throughput. A rate analysis is provided including coal price at the mine, rail rate to port, port handling charges, water transportation rates to western Europe, Great Lakes route versus the US Atlantic Coast ports.

  15. Spent nuclear fuel project design basis capacity study

    SciTech Connect (OSTI)

    Cleveland, K.J.

    1998-07-22T23:59:59.000Z

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration.

  16. Psychrometric Testing Facility Restoration and Cooling Capacity Testing

    E-Print Network [OSTI]

    Cline, Vincent E.

    2010-10-12T23:59:59.000Z

    .................................................................. 15 Table 3 Specified test tolerances for cooling capacity testing according to ASHRAE 210/240 .................................................................. 16 Table 4 Required test condition variations not covered in Table 2... throughout the test while maintaining the room conditions [2]. The air conditioning system and psychrometric rooms are run for at least 1.5 hours before data is recorded in order to allow the rooms to reach and maintain steady state conditions. Data...

  17. Optimal control in thermodynamic systems with sources of finite capacity

    SciTech Connect (OSTI)

    Kuznetsov, A.G.; Rudenko, A.V.; Tsirlin, A.M.

    1985-11-10T23:59:59.000Z

    This paper considers problems of optimal control of thermodynamic processes of heat and mass transfer on contact of two systems. The control signal is a vector of the temperatures and concentrations of one system, the parameters of the second being variable at a rate proportional to the heat and material flows. The limiting efficiency of the heat machine is found when the cycle duration and source capacities are bounded.

  18. Hybrid heat capacity-moving slab solid-state laser

    DOE Patents [OSTI]

    Stappaerts, Eddy A.

    2005-03-01T23:59:59.000Z

    Laser material is pumped and its stored energy is extracted in a heat capacity laser mode at a high duty factor. When the laser material reaches a maximum temperature, it is removed from the lasing region and a subsequent volume of laser material is positioned into the lasing region to repeat the lasing process. The heated laser material is cooled passively or actively outside the lasing region.

  19. High Capacity Pouch-Type Li-air Batteries

    SciTech Connect (OSTI)

    Wang, Deyu; Xiao, Jie; Xu, Wu; Zhang, Jiguang

    2010-05-05T23:59:59.000Z

    The pouch-type Li-air batteries operated in ambient condition are reported in this work. The battery used a heat sealable plastic membrane as package material, O2 diffusion membrane and moisture barrier. The large variation in internal resistance of the batteries is minimized by a modified separator which can bind the cell stack together. The cells using the modified separators show improved and repeatable discharge performances. It is also found that addition of about 20% of 1,2-dimethoxyethane (DME) in PC:EC (1:1) based electrolyte solvent improves can improve the wetability of carbon electrode and the discharge capacities of Li-air batteries, but further increase in DME amount lead to a decreased capacity due to increase electrolyte loss during discharge process. The pouch-type Li-air batteries with the modified separator and optimized electrolyte has demonstrated a specific capacity of 2711 mAh g-1 based on carbon and a specific energy of 344 Wh kg-1 based on the complete batteries including package.

  20. Near-Capacity Turbo Equalization Using Optimized Turbo Codes

    E-Print Network [OSTI]

    Vladimir D. Trajkovi?; Minyue Fu; Peter J. Schreier

    AbstractIn this paper we analyze a turbo equalization scheme that combines Maximum a Posteriori Probability (MAP) equalization and turbo decoding. Our aim is to optimize the turbo equalizer in order to approach the information capacity limit for channels with severe Inter-Symbol Interference (ISI). For this purpose, we perform an extensive search for turbo codes that give an SNR-BER performance closest to the channel information capacity limit. Our results show that the optimized turbo equalizer can approach the information capacity limit to within 0.7 dB. We also optimize the turbo equalizer in terms of the minimum number of required turbo decoding iterations. Our results show that a turbo decoder within a turbo equalization loop requires only a small number of iterations. Finally, our analysis reveals that when there are turbo codes with similar extrinsic information transfer characteristics, the computational complexity can be reduced by choosing the code with the smallest constraint length with no loss in SNR-BER performance. I.

  1. Building Long-Term Sustained Capacity and Influencing Decisions: The U.S. DOE SEP Capacity Model

    SciTech Connect (OSTI)

    McCarthy, Patrick [TecMarket Works; Hall, Nick [TecMarket Works; Schweitzer, Martin [ORNL; Lambert, Faith [U.S. Department of Energy

    2011-01-01T23:59:59.000Z

    This paper presents a state-level systems model that incorporates traditional behavior change models into a more extensive framework for explaining energy efficiency and renewable energy impacts. The model was developed from a seminal national study of state energy programs covering a broad array of programmatic topic areas. The study examined a wide range of program offerings within 24 states, involving over 25 years of state efforts. While specific priorities and outcomes varied greatly across the states for each of the topic areas, consistent systems-level capacity-building patterns were revealed. This model demonstrates how the U.S. Department of Energy s (DOE s) State Energy Program (SEP) and non-SEP resources, when incorporated into a framework of essential capacity-building components, can lead to energy efficiency and renewable energy achievements. This paper then features two case study illustrations of the model.

  2. Sensitivity of forced air distribution system efficiency to climate, duct location, air leakage and insulation

    E-Print Network [OSTI]

    Walker, Iain

    2001-01-01T23:59:59.000Z

    Location, Air Leakage and Insulation Iain S. Walker Energy4 Duct Insulation, Location and Leakageinsulation

  3. Identification of Owners Project Value Interests

    E-Print Network [OSTI]

    Gunby, Molly Gaynell

    2011-02-22T23:59:59.000Z

    and to aid the engineering and/or construction (E&C) provider in identifying an 4 appropriate value interest response strategy. The efforts of the CII study provided the value interest, project characteristic, and survey data required to complete... execution and delivery. Berman (2006) developed the Speed2Value? Road Map, a comprehensive process designed to help organizations focus on and achieve the strategic value of a project. The process is broad enough to be used in any industry and provides...

  4. TO: FILE MEMORANDUM SUBJECT: ALTERNATE OWNER(S)

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN3uj: ;;I : T'ncZl'FILESUBJECT:

  5. Continuous wavelet transform analysis and modal location analysis acoustic emission source location for nuclear piping crack growth monitoring

    SciTech Connect (OSTI)

    Mohd, Shukri [Nondestructive Testing Group, Industrial Technology Division, Malaysian Nuclear Agency, 43000, Bangi, Selangor (Malaysia); Holford, Karen M.; Pullin, Rhys [Cardiff School of Engineering, Cardiff University, Queen's Buildings, The Parade, CARDIFF CF24 3AA (United Kingdom)

    2014-02-12T23:59:59.000Z

    Source location is an important feature of acoustic emission (AE) damage monitoring in nuclear piping. The ability to accurately locate sources can assist in source characterisation and early warning of failure. This paper describe the development of a novelAE source location technique termed 'Wavelet Transform analysis and Modal Location (WTML)' based on Lamb wave theory and time-frequency analysis that can be used for global monitoring of plate like steel structures. Source location was performed on a steel pipe of 1500 mm long and 220 mm outer diameter with nominal thickness of 5 mm under a planar location test setup using H-N sources. The accuracy of the new technique was compared with other AE source location methods such as the time of arrival (TOA) techniqueand DeltaTlocation. Theresults of the study show that the WTML method produces more accurate location resultscompared with TOA and triple point filtering location methods. The accuracy of the WTML approach is comparable with the deltaT location method but requires no initial acoustic calibration of the structure.

  6. Automated detection and location of indications in eddy current signals

    DOE Patents [OSTI]

    Brudnoy, David M. (Albany, NY); Oppenlander, Jane E. (Burnt Hills, NY); Levy, Arthur J. (Schenectady, NY)

    2000-01-01T23:59:59.000Z

    A computer implemented information extraction process that locates and identifies eddy current signal features in digital point-ordered signals, signals representing data from inspection of test materials, by enhancing the signal features relative to signal noise, detecting features of the signals, verifying the location of the signal features that can be known in advance, and outputting information about the identity and location of all detected signal features.

  7. Expansion analyses of strategic petroleum reserve in Bayou Choctaw : revised locations.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Park, Byoung Yoon

    2010-11-01T23:59:59.000Z

    This report summarizes a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert one of the existing caverns within the Bayou Choctaw salt dome to expand its petroleum reserve storage capacity. An existing finite element mesh from previous analyses is modified by changing the locations of two caverns. The structural integrity of the three expansion caverns and the interaction between all the caverns in the dome are investigated. The impacts of the expansion on underground creep closure, surface subsidence, infrastructure, and well integrity are quantified. Two scenarios were used for the duration and timing of workover conditions where wellhead pressures are temporarily reduced to atmospheric pressure. The three expansion caverns are predicted to be structurally stable against tensile failure for both scenarios. Dilatant failure is not expected within the vicinity of the expansion caverns. Damage to surface structures is not predicted and there is not a marked increase in surface strains due to the presence of the three expansion caverns. The wells into the caverns should not undergo yield. The results show that from a structural viewpoint, the locations of the two newly proposed expansion caverns are acceptable, and all three expansion caverns can be safely constructed and operated.

  8. Locations of Smart Grid Demonstration and Large-Scale Energy...

    Broader source: Energy.gov (indexed) [DOE]

    the location of all projects created with funding from the Smart Grid Demonstration and Energy Storage Project, funded through the American Recovery and Reinvestment Act....

  9. Optimization Online - An MILP approach to Multi-location, Multi ...

    E-Print Network [OSTI]

    Christina N Burt

    2014-11-30T23:59:59.000Z

    Nov 30, 2014 ... An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies. Christina N Burt(cnburt ***at***...

  10. Located in historic Los Alamos, New Mexico against the backdrop...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Located in historic Los Alamos, New Mexico against the backdrop of the lush Jemez Mountains, Los Alamos National Laboratory (LANL) offers its education program participants...

  11. NMOCD - Form G-102 - Geothermal Resources Well Location and Acreage...

    Open Energy Info (EERE)

    Well Location and Acreage Dedication Plat Author State of New Mexico Energy and Minerals Department Published New Mexico Oil Conservation Division, 1978 DOI Not Provided...

  12. Attack-Resistant Location Estimation in Sensor (Revised August 2005)

    E-Print Network [OSTI]

    Ning, Peng

    role in many sensor network applications. Not only do applications such as environment monitoring and target tracking require sensors' location information to fulfill their tasks, but several fundamental

  13. acoustic location system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ON POWER SYSTEMS, VOL. 29, NO. 1, JANUARY 2014 203 Distribution Locational Marginal Pricing for Optimal Power Transmission, Distribution and Plants Websites Summary:...

  14. anatomic subsite location: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    services (e.g., electronic tolling, congestion pricing, traffic statistics, insurance pricing, location-based social applications), ... Popa, Raluca Ada 2010-01-01 First Page...

  15. agency dtra location: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    flows or spillovers between multinational enterprises (MNEs the diversity of locational environments. The localization of knowledge sources depends on MNE group of...

  16. Research Site Locations for Current and Former EERE Postdoctoral...

    Broader source: Energy.gov (indexed) [DOE]

    Research Site Locations for Current and Former EERE Postdoctoral Awards, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. eeremap2015.pdf...

  17. The Value of Flexibility in Robust Location-Transportation Problem

    E-Print Network [OSTI]

    Amir Ardestani-Jaafari

    2014-11-25T23:59:59.000Z

    Nov 25, 2014 ... Abstract: Facility location decisions play a critical role in transportation planning. In fact, it has recently become essential to study how such...

  18. Title 33 CFR 115 Bridge Locations and Clearances: Administrative...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 33 CFR 115 Bridge Locations and Clearances: Administrative ProceduresLegal...

  19. Identification of High Collision Concentration Locations Under Wet Weather Conditions

    E-Print Network [OSTI]

    Hwang, Taesung; Chung, Koohong; Ragland, David; Chan, Chin-Yao

    2008-01-01T23:59:59.000Z

    conducted under wet weather conditions. Observations fromLeahy, M. , and Suggett, J. Weather as a Chronic Hazard forLocations Under Wet Weather Conditions Taesung Hwang,

  20. p-facility Huff location problem on networks ?

    E-Print Network [OSTI]

    2014-10-30T23:59:59.000Z

    ing field, in problems such as location of petrol stations, shopping centers or restaurants. [14, 20, 22]. Network optimization models [5] are widely used in practice...

  1. Colorado CRS 29-20-108, Location, Construction, or Improvement...

    Open Energy Info (EERE)

    Location, Construction, or Improvement of Major Electrical or Natural Gas Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  2. Condensing Heating and Water Heating Equipment Workshop Location...

    Energy Savers [EERE]

    Condensing Heating and Water Heating Equipment Workshop Location: Washington Gas Light Appliance Training Facility 6801 Industrial Road Springfield, VA Date: October 9, 2014 Time:...

  3. The State Energy Program: Building Energy Efficiency and Renewable Energy Capacity in the States

    Broader source: Energy.gov [DOE]

    This study documents the capacity-building effects that the federal State Energy Program (SEP) has had on the states' capacity to design, manage and implement energy efficiency and renewable energy programs.

  4. Grid Integration and the Carrying Capacity of the U.S. Grid to...

    Energy Savers [EERE]

    Grid Integration and the Carrying Capacity of the U.S. Grid to Incorporate Variable Renewable Energy Grid Integration and the Carrying Capacity of the U.S. Grid to Incorporate...

  5. A New Vision for High-Capacity Hybrid Li-ion/Li-O2 Batteries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Introduces A New Vision for High-Capacity Hybrid Li-ionLi-O2 Batteries Diagram illustrating the CEES all-in-one vision for a high-capacity Li-ionLi-O2 cell. Illustration of CEES'...

  6. CRITICAL FIELD FOR SUPERCONDUCTIVITY AND LOW-TEMPERATURE NORMAL-STATE HEAT CAPACITY OF TUNGSTEN

    E-Print Network [OSTI]

    Triplett, B.B.

    2008-01-01T23:59:59.000Z

    NORMAL-STATE HEAT CAPACITY OF TUNGSTEN B. B. Triplett, N. E.State Heat Capacity of Tungsten* B. n. Triplett,t N. E.I. ;\\feasurement Properties of tungsten sa~ples. ~feasured

  7. Nanosheet-structured LiV3O8 with high capacity and excellent...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanosheet-structured LiV3O8 with high capacity and excellent stability for high energy lithium batteries . Nanosheet-structured LiV3O8 with high capacity and excellent stability...

  8. Design of a cluster analysis heuristic for the configuration and capacity management of manufacturing cells

    E-Print Network [OSTI]

    Shim, Young Hak

    2007-09-17T23:59:59.000Z

    , the machine capacity was first ensured, and then manufacturing cells were configured to minimize intercellular movements. In order to ensure the machine capacity, the duplication of machines and the split of operations are allowed and operations are assigned...

  9. Parameter Estimation and Capacity Fade Analysis of Lithium-Ion Batteries Using Reformulated Models

    E-Print Network [OSTI]

    Braatz, Richard D.

    Many researchers have worked to develop methods to analyze and characterize capacity fade in lithium-ion batteries. As a complement to approaches to mathematically model capacity fade that require detailed understanding ...

  10. Institutional owners and competitive rivalry

    E-Print Network [OSTI]

    Connelly, Brian Lawrence

    2008-10-10T23:59:59.000Z

    factors that make firms increasingly aware of competitive behavior (e.g., TMT heterogeneity and This dissertation follows the style of the Academy of Management Journal. 2 multimarket competition) and increasingly capable of initiating...

  11. A Super-Additivity Inequality for Channel Capacity of Classical-Quantum Channels

    E-Print Network [OSTI]

    Rahul Jain

    2009-02-20T23:59:59.000Z

    We show a super-additivity inequality for the channel capacity of classical-quantum (c - q) channels.

  12. Equation calculates activated carbon's capacity for adsorbing pollutants

    SciTech Connect (OSTI)

    Yaws, C.L.; Bu, L.; Nijhawan, S. (Lamar Univ., Beaumont, TX (United States))

    1995-02-13T23:59:59.000Z

    Adsorption on activated carbon is an effective method for removing volatile organic compound (VOC) contaminants from gases. A new, simple equation has been developed for calculating activated carbon's adsorption capacity as a function of the VOC concentration in the gas. The correlation shows good agreement with experimental results. Results from the equation are applicable for conditions commonly encountered in air pollution control techniques (25 C, 1 atm). The only input parameters needed are VOC concentrations and a table of correlation coefficients for 292 C[sub 8]-C[sub 14] compounds. The table is suitable for rapid engineering usage with a personal computer or hand calculator.

  13. Biological Kraft Chemical Recycle for Augmentation of Recovery Furnace Capacity

    SciTech Connect (OSTI)

    Stuart E. Strand

    2001-12-06T23:59:59.000Z

    The chemicals used in pulping of wood by the kraft process are recycled in the mill in the recovery furnace, which oxidizes organics while simultaneously reducing sulfate to sulfide. The recovery furnace is central to the economical operation of kraft pulp mills, but it also causes problems. The total pulp production of many mills is limited by the recovery furnace capacity, which cannot easily be increased. The furnace is one of the largest sources of air pollution (as reduced sulfur compounds) in the kraft pulp mill.

  14. Flood control reservoir operations for conditions of limited storage capacity

    E-Print Network [OSTI]

    Rivera Ramirez, Hector David

    2005-02-17T23:59:59.000Z

    ). Therefore, if the entire flood control capacity of a reservoir is available, only an extremely severe flood event would require the implementation of the EOS for most reservoir projects, and thus the bulk of the research has been focused on how to manage... operations objectives. In other words, the REOS provide a set of rules that reflect the risk of flooding upstream as well as downstream of the dams. The USACE and other reservoir management agencies may use the methodology proposed in this study...

  15. U.S. Downstream Charge Capacity of Operable Petroleum Refineries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^602SWPACharge Capacity

  16. EIA - Natural Gas Pipeline Network - Pipeline Capacity and Utilization

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization & Capacity About

  17. EIA - Natural Gas Pipeline Network - Region To Region System Capacity

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization & Capacity

  18. AGA Producing Region Natural Gas Working Underground Storage Capacity

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Building Floorspace (Square Feet) 1,001Capacity (Million(Million Cubic Feet)

  19. AGA WesternConsuming Region Natural Gas Underground Storage Capacity

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Building Floorspace (Square Feet) 1,001Capacity(Million Cubic(Million Cubic

  20. Property:Geothermal/CapacityBtuHr | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal PwerPerkins County, Nebraska:PrecourtOid Jump to:Docket Number JumpAnnualGenBtuYrCapacityBtuHr

  1. Property:PotentialHydropowerCapacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGeneration Jump to: navigation,PotentialHydropowerCapacity Jump to:

  2. Property:PotentialOffshoreWindCapacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGeneration Jump to:PotentialOffshoreWindCapacity Jump to: navigation, search

  3. Property:PotentialOnshoreWindCapacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGeneration Jump to:PotentialOffshoreWindCapacity Jump

  4. Property:Project Installed Capacity (MW) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod Jump to: navigation, search Property NameInstalled Capacity

  5. An Analytical Model for Predicting the Remaining Battery Capacity of Lithium-Ion Batteries

    E-Print Network [OSTI]

    Pedram, Massoud

    An Analytical Model for Predicting the Remaining Battery Capacity of Lithium-Ion Batteries Peng cycle-life tends to shrink significantly. The capacities of commercial lithium-ion batteries fade by 10 prediction model to estimate the remaining capacity of a Lithium-Ion battery. The proposed analytical model

  6. ERDC/CHLTR-12-18 Dredged Material Placement Site Capacity

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ERDC/CHLTR-12-18 Dredged Material Placement Site Capacity Analysis for Navigation Improvement. #12;ERDC/CHL TR-12-18 September 2012 Dredged Material Placement Site Capacity Analysis for Navigation of perfor- ming a dredged material placement (DMP) site capacity analysis for a Navigation Improvement

  7. On the Storage Capacity of Hopfield Models with Weakly Correlated Patterns

    E-Print Network [OSTI]

    Bielefeld, University of

    On the Storage Capacity of Hopfield Models with Weakly Correlated Patterns Matthias L¨owe Universit@mathematik.uni­bielefeld.de Keywords: Hopfield model, neural networks, storage capacity, Markov chains, large deviations AMS Subject Classification: 82C32, 82B44, 60K35 Abstract We analyze the storage capacity of different forms of the Hopfield

  8. Sensitivity of Gaussian Channel Capacity and ate-Distortion Function to nonGaussian Contamination

    E-Print Network [OSTI]

    Verd, Sergio

    Sensitivity of Gaussian Channel Capacity and ate-Distortion Function to nonGaussian Contamination-Gaussian contaminating noise. Although the ca- pacity of such channels cannot be evaluated in general, we analyze the decrease in capacity, or sensitivity of the channel capacity to the weak contaminating noise. We show

  9. Edinburgh Research Explorer ERK2 Suppresses Self-Renewal Capacity of Embryonic Stem

    E-Print Network [OSTI]

    Koehn, Philipp

    Edinburgh Research Explorer ERK2 Suppresses Self-Renewal Capacity of Embryonic Stem Cells, T 2013, 'ERK2 Suppresses Self-Renewal Capacity of Embryonic Stem Cells, but Is Not Required for Multi date: 26. Jun. 2014 #12;ERK2 Suppresses Self-Renewal Capacity of Embryonic Stem Cells

  10. Energy-efficient Capacity-constrained Routing in Wireless Sensor Networks

    E-Print Network [OSTI]

    Venkatesan, S.

    1 Energy-efficient Capacity-constrained Routing in Wireless Sensor Networks Maulin Patel*, R or maximize the lifetime of the sensor network without taking into consideration limited capacity of wireless-hoc networks; Routing; Maximum Lifetime; Energy efficient; Capacity-constrained I. INTRODUCTION Wireless sensor

  11. DETERMINATION OF PHOTOVOLTAIC EFFECTIVE CAPACITY FOR Richard Perez for Clean Power Research

    E-Print Network [OSTI]

    Perez, Richard R.

    DETERMINATION OF PHOTOVOLTAIC EFFECTIVE CAPACITY FOR NEW JERSEY Richard Perez for Clean Power) requirements. #12;DETERMINATION OF PHOTOVOLTAIC EFFECTIVE CAPACITY FOR NEW JERSEY The ELCC metric dispatchable power plant. 2 #12;DETERMINATION OF PHOTOVOLTAIC EFFECTIVE CAPACITY FOR NEW JERSEY 0 1 2 3 4 5 6 7

  12. On Capacity of Wireless Networks Using Practical Directional Antennas Linghe Kong, 2

    E-Print Network [OSTI]

    antennas, which is called MC-MDA network. The capacity in MC-MDA network is derived under arbitrary of side lobe into account. We derive the capacity upper-bounds of MC-MDA networks in arbitrary and random the ratio increases. Moreover, we compare the network capacity of MC-MDA using the simplified antenna model

  13. PJM's Capacity Market in a Price-Spike World Steven Stoft

    E-Print Network [OSTI]

    California at Berkeley. University of

    PWP-077 PJM's Capacity Market in a Price-Spike World Steven Stoft May, 2000 This paper is part, California 94720-5180 www.ucei.org #12;PJM's Capacity Market in a Price-Spike World Steven Stoft 1 May 7, 2000 Abstract PJM's market was designed to rely on a capacity market instead of price-spikes to induce

  14. Calculation of heat capacities of light and heavy water by path-integral molecular dynamics

    E-Print Network [OSTI]

    Nielsen, Steven O.

    reproduces the isotope effect. The heat capacity in the liquid D2O has been calculated to be 10% higher than important in the liquid phase. In fact, in many systems, the heat capacity has an isotope effect, whichCalculation of heat capacities of light and heavy water by path-integral molecular dynamics

  15. Non-Coherent Capacity of Secret-Key Agreement with Public Discussion

    E-Print Network [OSTI]

    Khisti, Ashish

    1 Non-Coherent Capacity of Secret-Key Agreement with Public Discussion Anurag Agrawal, Zouheir-coherent capacity of secret-key agreement with public discussion, where neither the sender nor the receivers have Signal-to-Noise Ratio (SNR), the secret-key capacity is bounded in SNR, regardless of the number

  16. Blind Channel Identification for the Emitter Location Problem

    E-Print Network [OSTI]

    Fowler, Mark

    a thesis entitled "Blind Channel Identification for the Emitter Location Problem: A Least Square ApproachBlind Channel Identification for the Emitter Location Problem: A Least Square Approach BY Cheung C. Chau B.S.E.E., Binghamton University, 2000 Thesis Submitted in Partial Fulfillment of the Requirements

  17. Derivation of Locational Marginal Prices for Restructured Wholesale Power Markets

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    Derivation of Locational Marginal Prices for Restructured Wholesale Power Markets Haifeng Liu restructured wholesale power markets, the detailed derivation of LMPs as actually used in industry practice Operator (MISO). Keywords: Locational marginal pricing, wholesale power market, AC optimal power flow, DC

  18. Model-based Lifecycle Optimization of Well Locations

    E-Print Network [OSTI]

    Van den Hof, Paul

    Model-based Lifecycle Optimization of Well Locations and Production Settings in Petroleum Reservoirs #12;#12;MODEL-BASED LIFECYCLE OPTIMIZATION OF WELL LOCATIONS AND PRODUCTION SETTINGS IN PETROLEUM System Approach Petroleum Production" (ISAPP) programme. The knowledge center is a long-term co

  19. Benefits of Location-Based Access Control: A Literature Study

    E-Print Network [OSTI]

    Wieringa, Roel

    Benefits of Location-Based Access Control: A Literature Study Andre van Cleeff, Wolter Pieters.pieters, r.j.wieringa}@utwente.nl Abstract--Location-based access control (LBAC) has been suggested-based, physical and logical access control, (ii) improving the transparency of LBAC decision making, and (iii

  20. Quartz resonators thermal modelization using located constants networks

    E-Print Network [OSTI]

    Boyer, Edmond

    of quartz resonator. The designed model is tested by comparison of the experimental frequency versus235 Quartz resonators thermal modelization using located constants networks S. Galliou and J. P modelization of quartz resonators is first presented ; next, the method consisting on establishing a located

  1. Detecting and Locating Radioactive Signals with Wireless Sensor Networks

    E-Print Network [OSTI]

    Zhang, Tonglin

    Detecting and Locating Radioactive Signals with Wireless Sensor Networks Tonglin Zhang Department-765-4940558 AbstractMethods of detecting and locating nuclear radioac- tive targets via wireless sensor networks (WSN model, radia- tion and radioactive isotopes, wireless sensor network. I. INTRODUCTION Currently, using

  2. A MODELING APPROACH FOR LOCATING LOGISTICS PLATFORMS FOR FAST PARCEL

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    1 29 A MODELING APPROACH FOR LOCATING LOGISTICS PLATFORMS FOR FAST PARCEL DELIVERY IN URBAN AREAS for optimizing, in a sustainable way (i.e. economical, eco-friendly and societal), the location of logistics has a logistics platform right in its centre (ARENC: 41362 m2 of warehouses and offices

  3. Facility Location with Hierarchical Facility Costs Zoya Svitkina #

    E-Print Network [OSTI]

    Tardos, ?va

    Facility Location with Hierarchical Facility Costs Zoya Svitkina # ?? Eva Tardos + Abstract We consider the facility location problem with hierarchi­ cal facility costs, and give a (4 installation costs. Shmoys, Swamy and Levi [13] gave an approxi­ mation algorithm for a two­level version

  4. Comparison of Different Methods for Next Location Prediction

    E-Print Network [OSTI]

    Ungerer, Theo

    Comparison of Different Methods for Next Location Prediction Jan Petzold, Faruk Bagci, Wolfgang prediction anticipates a person's movement based on the history of previous sojourns. It is useful location prediction methods: dynamic Bayesian network, multi-layer perceptron, Elman net, Markov predictor

  5. Location of Mobile Terminals using Time Measurements and Survey Points

    E-Print Network [OSTI]

    Plataniotis, Konstantinos N.

    Location of Mobile Terminals using Time Measurements and Survey Points M. McGuire ,K.N. Plataniotis is the Time Difference of Arrival (TDoA)method where the location of the mobile terminal is estimated using research communityon technologiesthat can estimatethe loca- tion of mobile terminals. Mobile terminal

  6. Models for Offender Target Location Selection with Explicit Dependency Structures

    E-Print Network [OSTI]

    O'Leary, Michael

    Models for Offender Target Location Selection with Explicit Dependency Structures Mike O'Leary April 30 - May 1, 2012 O'Leary & Tucker (Towson University) Target Location Selection QMDNS 2012 1 / 54 in this study We thank Phil Canter from the Baltimore County Police Department for his assistance. O'Leary

  7. Air conditioning system with supplemental ice storing and cooling capacity

    DOE Patents [OSTI]

    Weng, Kuo-Lianq (Taichung, TW); Weng, Kuo-Liang (Taichung, TW)

    1998-01-01T23:59:59.000Z

    The present air conditioning system with ice storing and cooling capacity can generate and store ice in its pipe assembly or in an ice storage tank particularly equipped for the system, depending on the type of the air conditioning system. The system is characterized in particular in that ice can be produced and stored in the air conditioning system whereby the time of supplying cooled air can be effectively extended with the merit that the operation cycle of the on and off of the compressor can be prolonged, extending the operation lifespan of the compressor in one aspect. In another aspect, ice production and storage in great amount can be performed in an off-peak period of the electrical power consumption and the stored ice can be utilized in the peak period of the power consumption so as to provide supplemental cooling capacity for the compressor of the air conditioning system whereby the shift of peak and off-peak power consumption can be effected with ease. The present air conditioning system can lower the installation expense for an ice-storing air conditioning system and can also be applied to an old conventional air conditioning system.

  8. Anywhere But Here: An Introduction to State Control of Hazardous Waste Facility Location

    E-Print Network [OSTI]

    Tarlock, Dan A.

    1981-01-01T23:59:59.000Z

    State Control Of Hazardous- Waste Facility Location A. Danautonomy over the location of hazardous-waste managementa hazardous-waste facility-siting process is the location of

  9. Residential mobility and location choice: a nested logit model with sampling of alternatives

    E-Print Network [OSTI]

    Lee, Brian H.; Waddell, Paul

    2010-01-01T23:59:59.000Z

    Waddell, P. : Modeling residential location in UrbanSim. In:D. (eds. ) Modelling Residential Location Choice. Springer,based model system and a residential location model. Urban

  10. Dual capacity compressor with reversible motor and controls arrangement therefor

    DOE Patents [OSTI]

    Sisk, Francis J. (Washington Township, Fayette County, PA)

    1980-12-02T23:59:59.000Z

    A hermetic reciprocating compressor such as may be used in heat pump applications is provided for dual capacity operation by providing the crankpin of the crankshaft with an eccentric ring rotatably mounted thereon, and with the end of the connecting rod opposite the piston encompassing the outer circumference of the eccentric ring, with means limiting the rotation of the eccentric ring upon the crankpin between one end point and an opposite angularly displaced end point to provide different values of eccentricity depending upon which end point the eccentric ring is rotated to upon the crankpin, and a reversible motor in the hermetic shell of the compressor for rotating the crankshaft, the motor operating in one direction effecting the angular displacement of the eccentric ring relative to the crankpin to the one end point, and in the opposite direction effecting the angular displacement of the eccentric ring relative to the crankpin to the opposite end point, this arrangement automatically giving different stroke lengths depending upon the direction of motor rotation. The mechanical structure of the arrangement may take various forms including at least one in which any impact of reversal is reduced by utilizing lubricant passages and chambers at the interface area of the crankpin and eccentric ring to provide a dashpot effect. In the main intended application of the arrangement according to the invention, that is, in a refrigerating or air conditioning system, it is desirable to insure a delay during reversal of the direction of compressor operation. A control arrangement is provided in which the control system controls the direction of motor operation in accordance with temperature conditions, the system including control means for effecting operation in a low capacity direction or alternatively in a high capacity direction in response to one set, and another set, respectively, of temperature conditions and with timer means delaying a restart of the compressor motor for at least a predetermined time in response to a condition of the control means operative to initiate a change in the operating direction of the compressor when it restarts.

  11. On Ergodic Secrecy Capacity for Gaussian MISO Wiretap Channels

    E-Print Network [OSTI]

    Li, Jiangyuan

    2010-01-01T23:59:59.000Z

    A Gaussian multiple-input single-output (MISO) wiretap channel model is considered, where there exists a transmitter equipped with multiple antennas, a legitimate receiver and an eavesdropper each equipped with a single antenna. We study the problem of finding the optimal input covariance that achieves ergodic secrecy capacity subject to a power constraint where only statistical information about the eavesdropper channel is available at the transmitter. This is a non-convex optimization problem that is in general difficult to solve. Existing results address the case in which the eavesdropper or/and legitimate channels have independent and identically distributed Gaussian entries with zero-mean and unit-variance, i.e., the channels have trivial covariances. This paper addresses the general case where eavesdropper and legitimate channels have nontrivial covariances. A set of equations describing the optimal input covariance matrix are proposed along with an algorithm to obtain the solution. Based on this framew...

  12. Psychrometric Testing Facility Restoration and Cooling Capacity Testing

    E-Print Network [OSTI]

    Cline, Vincent E.

    2010-10-12T23:59:59.000Z

    ......................... 17 Table 5 Correlation between the primary and secondary cooling capacity methods for each test...................................................................... 21 Table 6 Comparison of the performance for the different tests... 80.05 0.05 0.45 0.07 95.03 0.03 0.52 0.17 1A WB 67.06 0.06 0.29 0.11 2A DB 80.03 0.03 0.43 0.07 95.01 0.01 0.49 0.12 2A WB 66.83 -0.17 0.09 0.02 3A DB 79.94 -0.06 0.41 0.07 95.11 0.11 0.27 0.09 3A WB 66.88 -0.12 0...

  13. Cooling design of large capacity gas insulated transformer

    SciTech Connect (OSTI)

    Kawano, Koichiro; Biswas, Debasis; Ishizuka, Masaru; Muramatsu, Koji; Nakadate, Masumi; Toda, Katsutoshi [Toshiba Corp., Kawasaki (Japan)

    1995-12-31T23:59:59.000Z

    From the view point of safety and maintenance simplicity, the development of large capacity gas insulated transformer has been desirable. In this type of transformer, the coolant gas is circulated in the gap between the coils to cool it. The flow pattern of coolant in the flow path strongly depend on its configuration formed by the coil. Therefore, in order to achieve high cooling efficiency of coils and at the same time to reduce the pressure loss, it is important to have sufficient knowledge about the flow behavior in the coil flow path. In the present work, in order to improve the coil cooling efficiency, appropriate flow path configuration were decided on the basis of numerical simulation using various coil configuration and validity of the computed results were tested by comparing with experimental data.

  14. High capacity adsorption media and method of producing

    DOE Patents [OSTI]

    Tranter, Troy J. (Idaho Falls, ID); Mann, Nicholas R. (Blackfoot, ID); Todd, Terry A. (Aberdeen, ID); Herbst, Ronald S. (Idaho Falls, ID)

    2010-10-05T23:59:59.000Z

    A method of producing an adsorption medium to remove at least one constituent from a feed stream. The method comprises dissolving and/or suspending at least one metal compound in a solvent to form a metal solution, dissolving polyacrylonitrile into the metal solution to form a PAN-metal solution, and depositing the PAN-metal solution into a quenching bath to produce the adsorption medium. The at least one constituent, such as arsenic, selenium, or antimony, is removed from the feed stream by passing the feed stream through the adsorption medium. An adsorption medium having an increased metal loading and increased capacity for arresting the at least one constituent to be removed is also disclosed. The adsorption medium includes a polyacrylonitrile matrix and at least one metal hydroxide incorporated into the polyacrylonitrile matrix.

  15. Capacity Allocation and Pricing Strategies for Wireless Femtocell Services

    E-Print Network [OSTI]

    Duan, Lingjie; Huang, Jianwei

    2012-01-01T23:59:59.000Z

    Indoor cell phone users often suffer from poor connectivity. One promising solution, femtocell technology, has been rapidly developed and deployed over the past few years. One of the biggest challenges for femtocell deployment is lack of a clear business model. This paper investigates the economic incentive for the cellular operator (also called macrocell operator) to enable femtocell service by leasing spectrum resource to an independent femtocell operator. On the one hand, femtocell services can increase communication service quality and thus increase the efficiency of the spectrum resource. On the other hand, femtocell services may introduce more competition to the market. We model the interactions between a macrocell operator, a femtocell operator, and users as a three-stage dynamic game, and derive the equilibrium pricing and capacity allocation decisions. We show that when spectrum resources are very limited, the macrocell operator has incentive to lease spectrum to femtocell operators, as femtocell ser...

  16. Long-term need for new generating capacity

    SciTech Connect (OSTI)

    Bloomster, C.H.; Merrill, E.T.

    1987-03-01T23:59:59.000Z

    Electricity demand should continue to grow at about the same rate as GNP, creating a need for large amounts of new generating capacity by the year 2000. Only coal and nuclear at this time have the abundant domestic resources and assured technology to meet this need. However, large increase in both coal and nuclear usage will not be acceptable to society without solutions to many of the problems that now deter their increased usage. For coal, the problems center around the safety and environmental impacts of increased coal mining and coal combustion. For nuclear the problems center around reactor safety, radioactive waste disposal, financial risk, and nuclear materials safeguards. The fuel requirements and waste generation for coal plants are orders of magnitude greater than for nuclear. Technology improvements and waste management practices must be pursued to mitigate environmental and safety impacts from electricity generation. 26 refs., 14 figs., 23 tabs.

  17. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    SciTech Connect (OSTI)

    CLEVELAND, K.J.

    2000-08-17T23:59:59.000Z

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

  18. Location and design of a competitive facility for profit maximisation

    E-Print Network [OSTI]

    A single facility has to be located in competition with fixed existing facilities of .... xa and a strictly positive weight ?a, supposed to be an indicator of its buying...

  19. 2013 Fall Commencement Receptions College/School Time Location

    E-Print Network [OSTI]

    Pittendrigh, Barry

    2013 Fall Commencement Receptions College/School Time Location Agriculture 12/15 after ceremony@purdue.edu Nuclear 12/15 11:30-1:00 Nuclear Engineering Bldg, Rm 115 For more info Chrystal Randler (765

  20. Position: Forestry Intern Location: Lower Suwannee National Wildlife Refuge

    E-Print Network [OSTI]

    Mazzotti, Frank

    Position: Forestry Intern Location: Lower Suwannee National Wildlife Refuge Application Process: Student Conservation Association (SCA) Forestry and biological Wildlife Refuge. This forestry position will be mostly field work within the Lower

  1. accident location analysis: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    At the end, some safety-related recommendations are listed. Balda, F 2002-01-01 54 Multivariate data analysis based on two location vectors and two scatter matrices...

  2. Identification of critical locations across multiple infrastructures for terrorist actions

    E-Print Network [OSTI]

    Patterson, Sean A. (Sean Albert), 1981-

    2005-01-01T23:59:59.000Z

    This paper discusses a possible approach to ranking geographic regions that can influence multiple infrastructures. Once ranked, decision makers can determine whether these regions are critical locations based on their ...

  3. Location and Institution SOUTH AFRICA -PRETORIA FORDHAM UNIVERSITY -UBUNTU PROGRAM

    E-Print Network [OSTI]

    Galles, David

    Location and Institution SOUTH AFRICA - PRETORIA FORDHAM UNIVERSITY - UBUNTU demographics, and South Africa. Students will also take a required module in Sociology holders need a student visa to enter and study in South Africa, which must

  4. arbitrarily located electric: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficiently manage the electricity cost of distributed IDCs based on the Locational Marginal Pricing (LMP Rahman, A.K.M. Ashikur 475 Proper Use of ElectricGas UtilityType...

  5. An Information Theoretic Location Verification System for Wireless Networks

    E-Print Network [OSTI]

    Yan, Shihao; Nevat, Ido; Peters, Gareth W

    2012-01-01T23:59:59.000Z

    As location-based applications become ubiquitous in emerging wireless networks, Location Verification Systems (LVS) are of growing importance. In this paper we propose, for the first time, a rigorous information-theoretic framework for an LVS. The theoretical framework we develop illustrates how the threshold used in the detection of a spoofed location can be optimized in terms of the mutual information between the input and output data of the LVS. In order to verify the legitimacy of our analytical framework we have carried out detailed numerical simulations. Our simulations mimic the practical scenario where a system deployed using our framework must make a binary Yes/No "malicious decision" to each snapshot of the signal strength values obtained by base stations. The comparison between simulation and analysis shows excellent agreement. Our optimized LVS framework provides a defence against location spoofing attacks in emerging wireless networks such as those envisioned for Intelligent Transport Systems, wh...

  6. Methods for short-circuit identification and location in automobiles

    E-Print Network [OSTI]

    Crumlin, Alex Justin

    2006-01-01T23:59:59.000Z

    As the number of electrical components in cars increases at a rapid rate, so too does the chance for electrical failure. A method for locating shorts to the chassis of a car is developed in this thesis. The developed ...

  7. Short & long run transmission incentives for generation location

    E-Print Network [OSTI]

    Turvey, Ralph

    2006-01-01T23:59:59.000Z

    This paper is about one aspect of Britain's electricity trading system, its advantages and its weaknesses concerning the incentives it provides or fails to provide for the location of generation. (Similar considerations ...

  8. ambulance location monitoring: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    model adds a dependence on the datatype used to derive the location. M. S. Briggs; G. N. Pendleton; J. J. Brainerd; V. Connaughton; R. M. Kippen; C. Meegan; K. Hurley...

  9. Infill location determination and assessment of corresponding uncertainty

    E-Print Network [OSTI]

    Senel, Ozgur

    2009-05-15T23:59:59.000Z

    tried to solve this problem with statistical approaches. In this study, a reservoir simulation based approach was used to select infill well locations. I used multiple reservoir realizations to take different possible outcomes into consideration...

  10. Scalable Energy Efficient Location Aware Multicast Protocol for MANET (SEELAMP)

    E-Print Network [OSTI]

    Kamboj, Pariza

    2010-01-01T23:59:59.000Z

    Multicast plays an important role in implementing the group communications in bandwidth scarce multihop mobile ad hoc networks. However, due to the dynamic topology of MANETs it is very difficult to build optimal multicast trees and maintaining group membership, making even more challenging to implement scalable and robust multicast in Mobile Ad hoc Networks (MANET). A scalable and energy efficient location aware multicast algorithm, called SEELAMP, for mobile ad hoc networks is presented in the paper that is based on creation of shared tree using the physical location of the nodes for the multicast sessions. It constructs a shared bi-directional multicast tree for its routing operations rather than a mesh, which helps in achieving more efficient multicast delivery. The algorithm uses the concept of small overlapped zones around each node for proactive topology maintenance with in the zone. Protocol depends on the location information obtained using a distributed location service, which effectively reduces th...

  11. New approach to the fault location problem using synchronized sampling

    E-Print Network [OSTI]

    Mrkic, Jasna

    1994-01-01T23:59:59.000Z

    This thesis presents a new approach to solving the problem of fault location on a transmission line using synchronized data from both ends of the line. The synchronized phase voltage and current samples taken during the fault transient are used...

  12. accident locations: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Exact Location : Date of Accident : AM PM Environmental Sciences and Ecology Websites Summary: SSN Cell Phone Home...

  13. Location of the solar dynamo and near-surface shear

    E-Print Network [OSTI]

    Axel Brandenburg

    2005-12-29T23:59:59.000Z

    The location of the solar dynamo is discussed in the context of new insights into the theory of nonlinear turbulent dynamos. It is argued that, from a dynamo-theoretic point of view, the bottom of the convection zone is not a likely location and that the solar dynamo may be distributed over the convection zone. The near surface shear layer produces not only east-west field alignment, but it also helps the dynamo disposing of its excess small scale magnetic helicity.

  14. Predicting threshold and location of laser damage on optical surfaces

    DOE Patents [OSTI]

    Siekhaus, Wigbert (Berkeley, CA)

    1987-01-01T23:59:59.000Z

    An apparatus useful in the prediction of the damage threshold of various optical devices, the location of weak spots on such devices and the location, identification, and elimination of optical surface impurities comprising, a focused and pulsed laser, an photo electric detector/imaging means, and a timer. The weak spots emit photoelectrons when subjected to laser intensities that are less than the intensity actually required to produce the damage. The weak spots may be eliminated by sustained exposure to the laser beam.

  15. Tension capacity of two drilled and grouted piles

    E-Print Network [OSTI]

    Kubena, Mark Edward

    1989-01-01T23:59:59.000Z

    Movement, Load vs. Depth and Friction vs. Movement (Load Transfer). 2 SITE DESCRIPTION 2. 1 Location The site selected for this drilled and grouted pile research project is on the Texas A&M University Riverside Campus. The TAMU Riverside campus...) 24 results. The chart is based on the point bearing, q, versus the friction ratio, FR. The CPT soundings and the boring are used to prepare the cross section shown on Figure 17 which summarizes the soil conditions. 25 10F 4 20Ft 30FC STIFF...

  16. The private classical capacity with a symmetric side channel and its application to quantum cryptography

    E-Print Network [OSTI]

    Graeme Smith

    2007-05-25T23:59:59.000Z

    We study the symmetric-side-channel-assisted private capacity of a quantum channel, for which we provide a single-letter formula. This capacity is additive, convex, and, for degradable channels, equal to the unassisted private capacity. While a channel's (unassisted) capacity for for private classical communication may be strictly larger than its quantum capacity, we will show that these capacities are equal for degradable channels, thus demonstrating the equivalence of privacy and quantum coherence in this context. We use these ideas to find new bounds on the key rate of quantum key distribution protocols with one-way classical post-processing. For the Bennett-Brassard-84 (BB84) protocol, our results demonstrate that collective attacks are strictly stronger than individual attacks.

  17. Characterization of the Old Hydrofracture Facility (OHF) waste tanks located at ORNL

    SciTech Connect (OSTI)

    Keller, J.M.; Giaquinto, J.M.; Meeks, A.M.

    1997-04-01T23:59:59.000Z

    The Old Hydrofracture Facility (OHF) is located in Melton Valley within Waste Area Grouping (WAG) 5 and includes five underground storage tanks (T1, T2, T3, T4, and T9) ranging from 13,000 to 25,000 gal. capacity. During the period of 1996--97 there was a major effort to re-sample and characterize the contents of these inactive waste tanks. The characterization data summarized in this report was needed to address waste processing options, examine concerns dealing with the performance assessment (PA) data for the Waste Isolation Pilot Plant (WIPP), evaluate the waste characteristics with respect to the waste acceptance criteria (WAC) for WIPP and Nevada Test Site (NTS), address criticality concerns, and to provide the data needed to meet DOT requirements for transporting the waste. This report discusses the analytical characterization data collected on both the supernatant and sludge samples taken from three different locations in each of the OHF tanks. The isotopic data presented in this report supports the position that fissile isotopes of uranium ({sup 233}U and {sup 235}U) do not satisfy the denature ratios required by the administrative controls stated in the ORNL LLLW waste acceptance criteria (WAC). The fissile isotope of plutonium ({sup 239}Pu and {sup 241}Pu) are diluted with thorium far above the WAC requirements. In general, the OHF sludge was found to be hazardous (RCRA) based on total metal content and the transuranic alpha activity was well above the 100 nCi/g limit for TRU waste. The characteristics of the OHF sludge relative to the WIPP WAC limits for fissile gram equivalent, plutonium equivalent activity, and thermal power from decay heat were estimated from the data in this report and found to be far below the upper boundary for any of the remote-handled transuranic waste (RH-TRU) requirements for disposal of the waste in WIPP.

  18. EVALUATION OF REQUIREMENTS FOR THE DWPF HIGHER CAPACITY CANISTER

    SciTech Connect (OSTI)

    Miller, D.; Estochen, E.; Jordan, J.; Kesterson, M.; Mckeel, C.

    2014-08-05T23:59:59.000Z

    The Defense Waste Processing Facility (DWPF) is considering the option to increase canister glass capacity by reducing the wall thickness of the current production canister. This design has been designated as the DWPF Higher Capacity Canister (HCC). A significant decrease in the number of canisters processed during the life of the facility would be achieved if the HCC were implemented leading to a reduced overall reduction in life cycle costs. Prior to implementation of the change, Savannah River National Laboratory (SRNL) was requested to conduct an evaluation of the potential impacts. The specific areas of interest included loading and deformation of the canister during the filling process. Additionally, the effect of the reduced wall thickness on corrosion and material compatibility needed to be addressed. Finally the integrity of the canister during decontamination and other handling steps needed to be determined. The initial request regarding canister fabrication was later addressed in an alternate study. A preliminary review of canister requirements and previous testing was conducted prior to determining the testing approach. Thermal and stress models were developed to predict the forces on the canister during the pouring and cooling process. The thermal model shows the HCC increasing and decreasing in temperature at a slightly faster rate than the original. The HCC is shown to have a 3F ?T between the internal and outer surfaces versus a 5F ?T for the original design. The stress model indicates strain values ranging from 1.9% to 2.9% for the standard canister and 2.5% to 3.1% for the HCC. These values are dependent on the glass level relative to the thickness transition between the top head and the canister wall. This information, along with field readings, was used to set up environmental test conditions for corrosion studies. Small 304-L canisters were filled with glass and subjected to accelerated environmental testing for 3 months. No evidence of stress corrosion cracking was indicated on either the canisters or U-bend coupons. Calculations and finite element modeling were used to determine forces over a range of handling conditions along with possible forces during decontamination. While expected reductions in some physical characteristics were found in the HCC, none were found to be significant when compared to the required values necessary to perform its intended function. Based on this study and a review of successful testing of thinner canisters at West Valley Demonstration Project (WVDP), the mechanical properties obtained with the thinner wall do not significantly undermine the ability of the canister to perform its intended function.

  19. On quantum capacity of erasure channel assisted by back classical communication

    E-Print Network [OSTI]

    Debbie Leung; Joungkeun Lim; Peter Shor

    2010-01-02T23:59:59.000Z

    We present a communication protocol for the erasure channel assisted by backward classical communication, which achieves a significantly better rate than the best prior result. In addition, we prove an upper bound for the capacity of the channel. The upper bound is smaller than the capacity of the erasure channel when it is assisted by two-way classical communication. Thus, we prove the separation between quantum capacities assisted by backward classical communication and two-way classical communication.

  20. Scenario Planning as the Development of Leadership Capability and Capacity; and Virtual Human Resource Development

    E-Print Network [OSTI]

    McWhorter, Rochell 1963-

    2011-08-03T23:59:59.000Z

    SCENARIO PLANNING AS THE DEVELOPMENT OF LEADERSHIP CAPABILITY AND CAPACITY; AND VIRTUAL HUMAN RESOURCE DEVELOPMENT A Dissertation by ROCHELL RAE MCWHORTER Submitted to the Office of Graduate Studies of Texas A&M University... Capability and Capacity; and Virtual Human Resource Development Copyright 2011 Rochell Rae McWhorter SCENARIO PLANNING AS THE DEVELOPMENT OF LEADERSHIP CAPABILITY AND CAPACITY; AND VIRTUAL HUMAN RESOURCE DEVELOPMENT A Dissertation...

  1. Evaluation of the effect of capacity upon the performance of four industrial asbestos vacuum cleaners

    E-Print Network [OSTI]

    Loflin, Wilburn Joseph

    1978-01-01T23:59:59.000Z

    of asbestos which the manufacturing company specified that its vacuum cleaner was designed to contain (manufacturer's specified capacity). The suction pressure and airborne fiber concentrations were taken at each amount to determine what effect capacity... had upon vacuum cleaner performance. The analysis conducted on the collected data and the graphical repre- sentations of that data indicated that the effect capacity had upon vacuum cleaner performance was not evident in the airborne fiber con...

  2. Capacity analysis, cycle time optimization, and supply chain strategy in multi-product biopharmaceutical manufacturing operations

    E-Print Network [OSTI]

    Fetcho-Phillips, Kacey L. (Kacey Lynn)

    2011-01-01T23:59:59.000Z

    Application of system optimization theory, supply chain principles, and capacity modeling are increasingly valuable tools for use in pharmaceutical manufacturing facilities. The dynamics of the pharmaceutical industry - ...

  3. E-Print Network 3.0 - age-associated chaperone capacity Sample...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    capacity Page: << < 1 2 3 4 5 > >> 1 Chaperone networks: Tipping the balance in protein folding diseases Cindy Voisine, Jesper Sndergaard Pedersen, Richard I. Morimoto Summary:...

  4. Exploring Opportunities for Energy Efficiency as a Revenue Stream in the Forward Capacity Markets

    Broader source: Energy.gov [DOE]

    Provides information for energy efficiency programs on the opportunities and challenges associated with participating in forward capacity markets and reliability pricing models as potential revenue streams.

  5. Modeling the Capacity and Emissions Impacts of Reduced Electricity Demand. Part 1. Methodology and Preliminary Results.

    E-Print Network [OSTI]

    Coughlin, Katie

    2013-01-01T23:59:59.000Z

    ngcc nuclear coal ngcc nuclear other peaking renewable otherpeaking renewable Terawatt- hours Terawatt-hoursnuclear other peaking renewable Marginal Capacity Starting

  6. LG to DOE General Counsel; Re:Request for Comment on Large Capacity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clothes Washers LG response to DOE's request for information regarding alternative test procedures for large-capacity clothes washer models, December 7, 2010. After DOE...

  7. GE to DOE General Counsel; Re:Request for Comment on Large Capacity...

    Office of Environmental Management (EM)

    Clothes Washers GE urges the department engage in rulmaking to amend the clothes washer test procedure to reflect efficiency standards of large-capacity residential clothes washer...

  8. E-Print Network 3.0 - accurate heat capacity Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    equal to half of the heat production capacity of the CHP plants present in each district heating area... to be decommissioned before 2010. As the installed ... Source: Ris...

  9. Wireless networks in non-ergodic multipath fading : capacity and relaying performance analysis

    E-Print Network [OSTI]

    Nebat, Yoav

    2007-01-01T23:59:59.000Z

    3 The Capacity of Wireless Networks in Non-Ergodic Multipathdiversity in wireless networks: Ef?cient protocols anddiversity in wireless networks, IEEE Trans. Inf. Theory,

  10. 1993 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 2, Book 2, Capacity.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-12-01T23:59:59.000Z

    Monthly totals of utility loads and capacities extrapolated as far as 2009 with a probability estimate of enough water resources for hydro power.

  11. Comment on ''Secret-key-assisted private classical communication capacity over quantum channels''

    SciTech Connect (OSTI)

    Wilde, Mark M. [School of Computer Science, McGill University, Montreal, Quebec H3A 2A7 (Canada)

    2011-04-15T23:59:59.000Z

    The paper of Hsieh, Luo, and Brun (HLB) [Phys. Rev. A 78, 042306 (2008)] contains several issues with the capacity theorem presented there, one of which is the suggestion that a sender and receiver can achieve entanglement-assisted classical capacity without any entanglement at all, and another of which is a violation of the Holevo bound. There is also an issue with the converse proof of the capacity theorem. In this comment, I point out these issues and provide revisions of the capacity theorem and the converse proof.

  12. Channel Design to Increase Wastewater Treatment Wetland Capacity and Connectivity in Stockton, CA

    E-Print Network [OSTI]

    Cubbison, Erin O.

    2006-01-01T23:59:59.000Z

    Control Facility. Treatment Wetland System Startup PeriodDesign to Increase Wastewater Treatment Wetland Capacity andof wastewater treatment wetlands at the Stockton Regional

  13. Impurity-doped optical shock, detonation and damage location sensor

    DOE Patents [OSTI]

    Weiss, J.D.

    1995-02-07T23:59:59.000Z

    A shock, detonation, and damage location sensor providing continuous fiber-optic means of measuring shock speed and damage location, and could be designed through proper cabling to have virtually any desired crush pressure. The sensor has one or a plurality of parallel multimode optical fibers, or a singlemode fiber core, surrounded by an elongated cladding, doped along their entire length with impurities to fluoresce in response to light at a different wavelength entering one end of the fiber(s). The length of a fiber would be continuously shorted as it is progressively destroyed by a shock wave traveling parallel to its axis. The resulting backscattered and shifted light would eventually enter a detector and be converted into a proportional electrical signals which would be evaluated to determine shock velocity and damage location. The corresponding reduction in output, because of the shortening of the optical fibers, is used as it is received to determine the velocity and position of the shock front as a function of time. As a damage location sensor the sensor fiber cracks along with the structure to which it is mounted. The size of the resulting drop in detector output is indicative of the location of the crack. 8 figs.

  14. Impurity-doped optical shock, detonation and damage location sensor

    DOE Patents [OSTI]

    Weiss, Jonathan D. (Albuquerque, NM)

    1995-01-01T23:59:59.000Z

    A shock, detonation, and damage location sensor providing continuous fiber-optic means of measuring shock speed and damage location, and could be designed through proper cabling to have virtually any desired crush pressure. The sensor has one or a plurality of parallel multimode optical fibers, or a singlemode fiber core, surrounded by an elongated cladding, doped along their entire length with impurities to fluoresce in response to light at a different wavelength entering one end of the fiber(s). The length of a fiber would be continuously shorted as it is progressively destroyed by a shock wave traveling parallel to its axis. The resulting backscattered and shifted light would eventually enter a detector and be converted into a proportional electrical signals which would be evaluated to determine shock velocity and damage location. The corresponding reduction in output, because of the shortening of the optical fibers, is used as it is received to determine the velocity and position of the shock front as a function of time. As a damage location sensor the sensor fiber cracks along with the structure to which it is mounted. The size of the resulting drop in detector output is indicative of the location of the crack.

  15. Enhancement of Hydrogen Storage Capacity in Hydrate Lattices

    SciTech Connect (OSTI)

    Yoo, Soohaeng; Xantheas, Sotiris S.

    2012-02-16T23:59:59.000Z

    First principles electronic structure calculations of the gas phase pentagonal dodecahedron (H2O)20 (D-cage) and tetrakaidecahedron (H2O)24 (T-cage), which are building blocks of structure I (sI) hydrate lattice, suggest that these can accommodate up to a maximum of 5 and 7 guest hydrogen molecules, respectively. For the pure hydrogen hydrate, Born-Oppenheimer Molecular Dynamics (BOMD) simulations of periodic (sI) hydrate lattices indicate that the guest molecules are released into the vapor phase via the hexagonal phases of the larger T-cages. An additional mechanism for the migration between neighboring D- and T-cages was found to occur through a shared pentagonal face via the breaking and reforming of a hydrogen bond. This molecular mechanism is also found for the expulsion of a CH4 molecule from the D-cage. The presence of methane in the larger T-cages was found to block this release, therefore suggesting possible scenarios for the stabilization of these mixed guest clathrate hydrates and the potential enhancement of their hydrogen storage capacity.

  16. A flexible location management scheme for mobile computing

    E-Print Network [OSTI]

    Zhang, Ying

    1996-01-01T23:59:59.000Z

    , ation B. Distril?Ite&1 Datahase Management System (DBMS) . C. Prototype Design and Conhgurat, ion 24 24 99 vn CHAPTER Pa. ge IV EXPERIMENTAL RESULTS . A. ExpeHmental Results B. Analytic Results 38 V CONCLUSION REFERENCES 43 VITA 47 vn1... rent l)DBMS's. tVe have cleveloped an experimental prototype t, hat rc&nsiclers these charact, eris- tics of a, location mauagen&ent system. The nltin&ate purpose of' this prototype is to demonstrate the feasibility of our proposecl location...

  17. Predicting threshold and location of laser damage on optical surfaces

    DOE Patents [OSTI]

    Siekhaus, W.

    1985-02-04T23:59:59.000Z

    Disclosed is an apparatus useful in the prediction of the damage threshold of various optical devices, the location of weak spots on such devices and the location, identification, and elimination of optical surface impurities. The apparatus comprises a focused and pulsed laser, a photo electric detector/imaging means, and a timer. The weak spots emit photoelectrons when subjected to laser intensities that are less than the intensity actually required to produce the damage. The weak spots may be eliminated by sustained exposure to the laser beam.

  18. Location of MTBE and toluene in the channel system of the zeolite mordenite: Adsorption and host-guest interactions

    SciTech Connect (OSTI)

    Arletti, Rossella, E-mail: rossella.arletti@unito.it [Department of Earth Sciences, University of Torino Via Valperga Caluso 35, I-10125, Torino (Italy)] [Department of Earth Sciences, University of Torino Via Valperga Caluso 35, I-10125, Torino (Italy); Martucci, Annalisa; Alberti, Alberto [Department of Earth Sciences, University of Ferrara, Via G. Saragat 1, I-44100, Ferrara (Italy)] [Department of Earth Sciences, University of Ferrara, Via G. Saragat 1, I-44100, Ferrara (Italy); Pasti, Luisa; Nassi, Marianna [Department of Chemistry, University of Ferrara, Via L. Borsari 26, I-44100 Ferrara (Italy)] [Department of Chemistry, University of Ferrara, Via L. Borsari 26, I-44100 Ferrara (Italy); Bagatin, Roberto [Research Centre for Non-Conventional Energy-Istituto ENI Donegani, Environmental Technologies, Via Fauser 4, I-28100 Novara (Italy)] [Research Centre for Non-Conventional Energy-Istituto ENI Donegani, Environmental Technologies, Via Fauser 4, I-28100 Novara (Italy)

    2012-10-15T23:59:59.000Z

    This paper reports a study of the location of Methyl Tertiary Butyl Ether (MTBE) and toluene molecules adsorbed in the pores of the organophylic zeolite mordenite from an aqueous solution. The presence of these organic molecules in the zeolite channels was revealed by structure refinement performed by the Rietveld method. About 3 molecules of MTBE and 3.6 molecules of toluene per unit cell were incorporated into the cavities of mordenite, representing 75% and 80% of the total absorption capacity of this zeolite. In both cases a water molecule was localized inside the side pocket of mordenite. The saturation capacity determined by the adsorption isotherms, obtained by batch experiments, and the weight loss given by thermogravimetric (TG) analyses were in very good agreement with these values. The interatomic distances obtained after the structural refinements suggest MTBE could be connected to the framework through a water molecule, while toluene could be bonded to framework oxygen atoms. The rapid and high adsorption of these hydrocarbons into the organophylic mordenite zeolite makes this cheap and environmental friendly material a suitable candidate for the removal of these pollutants from water. - graphical abstract: Location of MTBE (a) and toluene (b) in mordenite channels (projection along the [001] direction). Highlights: Black-Right-Pointing-Pointer We investigated the MTBE and toluene adsorption process into an organophilic zeolite mordenite. Black-Right-Pointing-Pointer The presence of MTBE and toluene in mordenite was determined by X-ray diffraction studies. Black-Right-Pointing-Pointer About 3 molecules of MTBE and 3.6 molecules of toluene per unit cell were incorporated into the zeolite cavities. Black-Right-Pointing-Pointer MTBE is connected to the framework through a water molecule. Black-Right-Pointing-Pointer Toluene is directly bonded to framework oxygen atoms.

  19. Development of a high capacity longwall conveyor. Final technical report

    SciTech Connect (OSTI)

    Sparks, C

    1982-05-01T23:59:59.000Z

    The objectives of this program were to develop, fabricate, and demonstrate a longwall conveying system capable of transporting coal at a rate of 9000 tons/day (1000 tons/hr) and capable of accommodating a surge rate of 20 tons/min. The equipment was required to have the structural durability to perform with an operating availability of 90%. A review of available literature and discussions with longwall operators identified the problem areas of conveyor design that required attention. The conveyor under this contract was designed and fabricated with special attention given to these areas, and also to be easily maintainable. The design utilized twin 300 hp drives and twin inboard 26-mm chain at 270 ft/min; predictions of capacity and reliability based on the design indicating that it would satisfy the program requirements. Conveyor components were critically tested and the complete conveyor was surface-tested, the results verifying the design specifications. In addition, an instrumentation system was developed with analysis by computer techniques to monitor the performance of the conveyor. The conveyor was installed at a selected mine site, and it was the intention to monitor its performance over the entire longwall panel. Monitoring of the conveyor performance was conducted over approximately one-third of the longwall panel, at which point further effort was suspended. However, during the monitored period, data collected from various sources showed the conveyor to have exhibited its capability of transporting coal at the desired rate, and also to have conformed to the program requirements of reliability and availability.

  20. Parameter Estimation and Capacity Fade Analysis of Lithium-Ion Batteries Using Reformulated Models

    E-Print Network [OSTI]

    Subramanian, Venkat

    Parameter Estimation and Capacity Fade Analysis of Lithium-Ion Batteries Using Reformulated Models and characterize capacity fade in lithium-ion batteries. As a comple- ment to approaches to mathematically model been made in developing lithium-ion battery models that incor- porate transport phenomena