National Library of Energy BETA

Sample records for owned treatment works

  1. RCRA information on hazardous wastes for publicly owned treatment works. Technical report

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    The guidance manual provides guidance to municipal personnel in understanding hazardous waste requirements of the Resource Conservation and Recovery Act (RCRA) and the implications of these RCRA requirements for the wastewater treatment plant operated by your municipality, for your local pretreatment program, and for local industries served by the treatment plant. The primary purpose of the manual is the RCRA notification requirement specified in the General Pretreatment Regulations. The manual focuses on Subtitle C requirements. (Subtitle C is directly applicable to industries since this program regulates generators, transporters, and disposers of hazardous waste). The manual also provides a general understanding of how federal RCRA requirements for hazardous waste affect industrial users. The manual also will be helpful in complying with any applicable federal requirements incumbent upon your POTW under Subtitle C of RCRA. The appendices contain lists of hazardous wastes regulated by federal requirements; selected EPA-approved forms for hazardous waste facilities to use; RCRA information brochure which briefly outlines the Act's impact on industries that generate or transport hazardous wastes; and EPA pamphlets summarizing information for generators of small quantities of hazardous waste.

  2. TGLO - Application to Perform Seismic Work on State-Owned Land...

    Open Energy Info (EERE)

    TGLO - Application to Perform Seismic Work on State-Owned Land Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: TGLO - Application to Perform Seismic Work...

  3. Working with SRNL - Our Facilities- Waste Treatment Laboratories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Treatment Laboratories Working with SRNL Our Facilities - Waste Treatment Laboratories The Waste Treatment Laboratories is a collection of laboratories for research and...

  4. Guidance manual for the identification of hazardous wastes delivered to publicly owned treatment works by truck, rail, or dedicated pipe

    SciTech Connect (OSTI)

    Not Available

    1987-06-01

    The manual is directed towards two types of facilities: First, guidance is to POTWs that wish to preclude the entry of hazardous wastes into their facilities and avoid regulation and liability under RCRA. Administrative/technical recommendations for control of such wastes is provided, many of which are already in use by POTWs. Second, the responsibilities of POTWs that choose to accept hazardous wastes from truck, rail, or dedicated pipeline are discussed, including relevant regulatory provisions, strict liability and corrective action requirements for releases, and recommended procedures for waste acceptance/management. The manual describes the RCRA regulatory status of wastes that POTW operators typically may encounter. The manual includes a Waste Monitoring Plan. Appendices give the following: RCRA lists; RCRA listed hazardous wastes; examples of POTW sewer use ordinance language, waste hauler permit; waste tracking form, notification of hazardous waste activity; uniform hazardous waste manifest; biennial hazardous waste report; and state hazardous waste contacts.

  5. Bring Your Own Device

    Broader source: Energy.gov [DOE]

    Bring your own Device, or BYOD, has been a popular topic for some time now. While government organizations and private companies continue to struggle with how to enjoy the business and economic...

  6. Coke oven gas treatment and by-product plant of Magnitogorsk Integrated Iron and Steel Works

    SciTech Connect (OSTI)

    Egorov, V.N.; Anikin, G.J.; Gross, M.

    1995-12-01

    Magnitogorsk Integrated Iron and Steel Works, Russia, decided to erect a new coke oven gas treatment and by-product plant to replace the existing obsolete units and to improve the environmental conditions of the area. The paper deals with the technological concept and the design requirements. Commissioning is scheduled at the beginning of 1996. The paper describes H{sub 2}S and NH{sub 3} removal, sulfur recovery and ammonia destruction, primary gas cooling and electrostatic tar precipitation, and the distributed control system that will be installed.

  7. Tell Us: Your Thoughts on a Bring Your Own Device Policy | Department of

    Energy Savers [EERE]

    Energy Tell Us: Your Thoughts on a Bring Your Own Device Policy Tell Us: Your Thoughts on a Bring Your Own Device Policy October 2, 2012 - 12:25pm Addthis The Bring Your Own Device (BYOD) effort will focus on how personally owned devices could be used for government work. The Bring Your Own Device (BYOD) effort will focus on how personally owned devices could be used for government work. Peter J. Tseronis Peter J. Tseronis Former Chief Technology Officer What does this mean for me? You will

  8. Are neutrinos their own antiparticles?

    SciTech Connect (OSTI)

    Kayser, Boris; /Fermilab

    2009-03-01

    We explain the relationship between Majorana neutrinos, which are their own antiparticles, and Majorana neutrino masses. We point out that Majorana masses would make the neutrinos very distinctive particles, and explain why many theorists strongly suspect that neutrinos do have Majorana masses. The promising approach to confirming this suspicion is to seek neutrinoless double beta decay. We introduce a toy model that illustrates why this decay requires nonzero neutrino masses, even when there are both right-handed and left-handed weak currents.

  9. ARM - Lesson Plans: Your Own Greenhouse

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Your Own Greenhouse Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Lesson Plans: Your Own Greenhouse Objective The objective is to make your own small greenhouse and in a simple way to test its effect on temperature. Materials Each student or group of students will need the following:

  10. Users May Now Clear Their Own Login Failures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Users May Now Clear Their Own Login Failures Users May Now Clear Their Own Login Failures May 16, 2013 by Francesca Verdier Users may now clear their own login failures simply by...

  11. SBA Expands Access to Contracting Opportunities for Women-Owned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expands Access to Contracting Opportunities for Women-Owned Small Businesses SBA Expands Access to Contracting Opportunities for Women-Owned Small Businesses January 22, 2013 - ...

  12. KPaul A Service Disabled Veteran-Owned Small Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    KPaul A Service Disabled Veteran-Owned Small Business Jennifer Muth's initial phone call put her in touch with Ann Riley, Sandia's Business Point of Contact. "I work with all new company inquiries to make sure they have the qualifications to become a Sandia supplier," comments Ann. "I saw right away that the company had the potential to be a successful supplier for Sandia. Jennifer understood our market and what we buy and came prepared with all of the information necessary to get

  13. Stories of Discovery & Innovation: Beating Nature at her Own Game? | U.S.

    Office of Science (SC) Website

    DOE Office of Science (SC) Beating Nature at her Own Game? Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights News & Events EFRC News EFRC Events DOE Announcements Publications History Contact BES Home 08.24.11 Stories of Discovery & Innovation: Beating Nature at her Own Game? Print Text Size: A A A Subscribe FeedbackShare Page New catalyst speeds conversion of electricity to hydrogen fuel. This work, featured in the Office of Science's Stories of

  14. BNL Technical Services Awarded Service-Disabled Veteran-Owned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BNL Technical Services Awarded Service-Disabled Veteran-Owned Small Business of the Year BNL Technical Services Awarded Service-Disabled Veteran-Owned Small Business of the Year ...

  15. Financial statistics of major publicly owned electric utilities, 1991

    SciTech Connect (OSTI)

    Not Available

    1993-03-31

    The Financial Statistics of Major Publicly Owned Electric Utilities publication presents summary and detailed financial accounting data on the publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with data that can be used for policymaking and decisionmaking purposes relating to publicly owned electric utility issues.

  16. It worked

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Yes, it worked

  17. The Appraisal Process: Be Your Own Advocate | Department of Energy

    Energy Savers [EERE]

    Appraisal Process: Be Your Own Advocate The Appraisal Process: Be Your Own Advocate The Appraisal Process: Be Your Own Advocate, a presentation of the U.S. Department of Energy's DOE Zero Energy Ready Home program. PDF icon ZERH Appraisal Process More Documents & Publications DOE ZERH Webinar: Technical Resources for Marketing and Selling Zero Energy Ready Homes Zero Energy Ready Home Training Presentation Collective Impact for Zero Net Energy Homes

  18. Financial statistics of selected investor-owned electric utilities, 1989

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The Financial Statistics of Selected Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide the Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues.

  19. Financial statistics of major US publicly owned electric utilities 1993

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    The 1993 edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents five years (1989 to 1993) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decision making purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. The primary source of publicly owned financial data is the Form EIA-412, the Annual Report of Public Electric Utilities, filed on a fiscal basis.

  20. Performance Excellence Partners Wins Woman-Owned Small Business...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the top women and minority-owned businesses by revenue in the Orange County Business Journal * Aligned with two small businesses designated 8(a) * Began development of General ...

  1. Faith Enterprises Inc. A Service Disabled Veteran-Owned Small Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Faith Enterprises Inc. A Service Disabled Veteran-Owned Small Business Security When the Air Force asked Sandia to deliver complex security upgrades to a facility on Kirtland Air Force Base, work began immediately to identify how best to get the job done. Engineers at Sandia teamed with Sandia Contracting Representative Michael Somuk to sub-contract a portion of the work. Because of the sensitive nature of the project, security and previous experience with government contracts were placed as

  2. Green Energy Options for Consumer-Owned Business

    SciTech Connect (OSTI)

    Co-opPlus of Western Massachusetts

    2006-05-01

    The goal of this project was to define, test, and prototype a replicable business model for consumer-owned cooperatives. The result is a replicable consumer-owned cooperative business model for the generation, interconnection, and distribution of renewable energy that incorporates energy conservation and efficiency improvements.

  3. Users May Now Clear Their Own Login Failures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Users May Now Clear Their Own Login Failures Users May Now Clear Their Own Login Failures May 16, 2013 by Francesca Verdier Users may now clear their own login failures simply by logging in to the NIM website (https://nim.nersc.gov). No further steps are necessary; that is, the simple act of logging in to NIM will clear your login failures on all NERSC compute systems. NIM will then provide a display of the number of login failures that were cleared on each compute system that was affected at

  4. Save Money with Your Very Own Drapes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Drapes Save Money with Your Very Own Drapes June 11, 2012 - 2:47pm Addthis Elizabeth Spencer Communicator, National Renewable Energy Laboratory So, last winter I decided that I...

  5. Faith Enterprises Inc. A Service Disabled Veteran-Owned Small...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Faith Enterprises Inc. A Service Disabled Veteran-Owned Small Business Security When the Air Force asked Sandia to deliver complex security upgrades to a facility on Kirtland Air...

  6. Minority-Owned Business Creating Career Opportunities | Department of

    Office of Environmental Management (EM)

    Energy Minority-Owned Business Creating Career Opportunities Minority-Owned Business Creating Career Opportunities September 15, 2010 - 2:21pm Addthis Most Catalyst Management Group employees had no previous experience with weatherization. | Photo by CMG Most Catalyst Management Group employees had no previous experience with weatherization. | Photo by CMG Lindsay Gsell What are the key facts? This Pontiac, Michigan weatherization company sees growth through Recovery Act. Catalyst Management

  7. RADIOLOGICAL SURVEY OF A PORTION OF PROPERTY OWNED BY MODERN LANDFILL, INC. -

    Office of Legacy Management (LM)

    A" 917 RADIOLOGICAL SURVEY OF A PORTION OF PROPERTY OWNED BY MODERN LANDFILL, INC. - FORMER LOOW SITE Summary Report Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1981 OAK RIDGE NATIONAL LABORATORY operated by UNION. CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program CONTENTS Page LIST OF FIGURES .. .. . .. . . . . . . . ......... iii LIST OF TABLES

  8. What problem are you working on?

    ScienceCinema (OSTI)

    None

    2014-09-15

    Superconductors, supercomputers, new materials, clean energy, big science - ORNL researchers' work is multidisciplinary and world-leading. Hear them explain it in their own words in this video first shown at UT-Battelle's 2013 Awards Night.

  9. What problem are you working on?

    SciTech Connect (OSTI)

    2013-11-21

    Superconductors, supercomputers, new materials, clean energy, big science - ORNL researchers' work is multidisciplinary and world-leading. Hear them explain it in their own words in this video first shown at UT-Battelle's 2013 Awards Night.

  10. Safety of Department of Energy-Owned Nuclear Reactors

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1986-09-23

    To establish reactor safety program requirements assure that the safety of each Department of Energy-owned (DOE-owned) reactor is properly analyzed, evaluated, documented, and approved by DOE; and reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that gives adequate protection for health and safety and will be in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. Cancels Chap. 6 of DOE O 5480.1A. Paragraphs 7b(3), 7e(3) & 8c canceled by DOE O 5480.23 & canceled by DOE N 251.4 of 9-29-95.

  11. Financial statistics of major US publicly owned electric utilities 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The 1992 edition of the Financial Statistics of Major US Publicly Owned Electric Utilities publication presents 4 years (1989 through 1992) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. Four years of summary financial data are provided. Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. The primary source of publicly owned financial data is the Form EIA-412, {open_quotes}Annual Report of Public Electric Utilities.{close_quotes} Public electric utilities file this survey on a fiscal year, rather than a calendar year basis, in conformance with their recordkeeping practices. In previous editions of this publication, data were aggregated by the two most commonly reported fiscal years, June 30 and December 31. This omitted approximately 20 percent of the respondents who operate on fiscal years ending in other months. Accordingly, the EIA undertook a review of the Form EIA-412 submissions to determine if alternative classifications of publicly owned electric utilities would permit the inclusion of all respondents.

  12. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS! Mediation helps to build relationships. People solve their own problems by looking to the future, rather than finding fault with the past. YOU (the participant involved) make the decisions. * Mediation often works in conjunction with other dispute resolution processes, such as grievances or equal employment opportunity (EEO) complaints. However, mediation does NOT forestall established timeframes within those processes, nor does it constitute legal

  13. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Energy Savers [EERE]

    HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS! Mediation helps to strengthen relationships. People solve their own problems by looking to the future, rather than finding fault with the past. YOU (the participant involved) make the decisions. * Mediation often works in conjunction with other dispute resolution processes, such as grievances or equal employment opportunity (EEO) complaints. However, mediation does NOT forestall established timeframes within those processes, nor does it constitute

  14. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S....

  15. Financial statistics of major US publicly owned electric utilities 1994

    SciTech Connect (OSTI)

    1995-12-15

    This publication presents 5 years (1990--94) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. Generator and nongenerator summaries are presented. Composite tables present: Aggregates of income statement and balance sheet data, financial indicators, electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data.

  16. GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM

    Office of Environmental Management (EM)

    GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM The Department of Energy has on a variety of occasions engaged in transactions under which it bartered uranium to which it has title for goods or services . This guidance memorializes the results of analyses previously directed to individual proposed transactions . For the reasons discussed below, we conclude that the Atomic Energy Act of 1954' , as amended, (AEA), authorizes such barter transactions. Background : DOE Barter

  17. Financial statistics major US publicly owned electric utilities 1996

    SciTech Connect (OSTI)

    1998-03-01

    The 1996 edition of The Financial Statistics of Major US Publicly Owned Electric Utilities publication presents 5 years (1992 through 1996) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decision making purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. Five years of summary financial data are provided. Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. 2 figs., 32 tabs.

  18. Greenhouse gas emissions from landfill leachate treatment plants: A

    Office of Scientific and Technical Information (OSTI)

    comparison of young and aged landfill (Journal Article) | SciTech Connect Greenhouse gas emissions from landfill leachate treatment plants: A comparison of young and aged landfill Citation Details In-Document Search Title: Greenhouse gas emissions from landfill leachate treatment plants: A comparison of young and aged landfill Highlights: * Young and aged leachate works accounted for 89.1% and 10.9% of 33.35 Gg CO{sub 2} yr{sup -1}. * Fresh leachate owned extremely low ORP and high organic

  19. CABLE AOORIs*. HICRONIZER. MOORLblOWN. NEW ,SRIEY

    Office of Legacy Management (LM)

    NEW ALBANY ROAD . MOORESTOWN . NEW ]ERSEY CABLE AOORIs*. HICRONIZER. MOORLblOWN. NEW ,SRIEY be returned further obliga- may desire any patent protection, provi#ed; however, that the costa in connectSo& with the pregaration;~~fillrig nnd prosecution of the same shall be entirely: at ?SG,~~e~enS.e ,of our..company. This provision, how- ever, ls.' subJect:to eny.~prlor'arra~cmont between your Institu- tion and the government with respect to inventions and p?j,tents. ,.: 3,ri 'I :: .:v:ri :!:!p,

  20. Better Buildings Residential Network Program Sustainability/Working with Utilities Peer Exchange Call: Working with Smaller Municipal Utilities Call Slides and Summary, June 27, 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Sustainability/Working with Utilities Peer Exchange Call: Working with Smaller Municipal Utilities Call Slides and Summary Agenda * Call Logistics and Roll Call * Is your program working with smaller municipal utilities or other types of publicly owned utilities? * Discussion  How does working with publicly-owned utilities differ from working with other types of utilities?  What are key challenges and opportunities for working with smaller municipal utilities or other publicly

  1. V-033: ownCloud Cross-Site Scripting and File Upload Vulnerabilities |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3: ownCloud Cross-Site Scripting and File Upload Vulnerabilities V-033: ownCloud Cross-Site Scripting and File Upload Vulnerabilities November 26, 2012 - 2:00am Addthis PROBLEM: ownCloud Cross-Site Scripting and File Upload Vulnerabilities PLATFORM: ownCloud 4.5.2, 4.5.1, 4.0.9 ABSTRACT: Multiple vulnerabilities have been reported in ownCloud REFERENCE LINKS: ownCloud Server Advisories Secunia Advisory SA51357 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Input passed via the

  2. A spacecraft's own ambient environment: The role of simulation-based research

    SciTech Connect (OSTI)

    Ketsdever, Andrew D.; Gimelshein, Sergey

    2014-12-09

    Spacecraft contamination has long been a subject of study in the rarefied gas dynamics community. Professor Mikhail Ivanov coined the term a spacecraft's 'own ambient environment' to describe the effects of natural and satellite driven processes on the conditions encountered by a spacecraft in orbit. Outgassing, thruster firings, and gas and liquid dumps all contribute to the spacecraft's contamination environment. Rarefied gas dynamic modeling techniques, such as Direct Simulation Monte Carlo, are well suited to investigate these spacebased environments. However, many advances were necessary to fully characterize the extent of this problem. A better understanding of modeling flows over large pressure ranges, for example hybrid continuum and rarefied numerical schemes, were required. Two-phase flow modeling under rarefied conditions was necessary. And the ability to model plasma flows for a new era of propulsion systems was also required. Through the work of Professor Ivanov and his team, we now have a better understanding of processes that create a spacecraft's own ambient environment and are able to better characterize these environments. Advances in numerical simulation have also spurred on the development of experimental facilities to study these effects. The relationship between numerical results and experimental advances will be explored in this manuscript.

  3. Stories of Discovery & Innovation: Beating Nature at her Own...

    Office of Science (SC) Website

    This work, featured in the Office of Science's Stories of Discovery & Innovation, was supported by the Center for Molecular Electrocatalysis (CME), an EFRC led by Morris Bullock at ...

  4. Awards go to disadvantaged, veteran-owned and small businesses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services of Santa Fe received DOE's Small Business of the Year award. Eberline conducted environmental drilling services at LANL. The work in 2011 was completed without recordable...

  5. May 23 ChallengeHER Women Owned Small Business Event in Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 23 ChallengeHER Women Owned Small Business Event in Washington, DC May 23 ChallengeHER Women Owned Small Business Event in Washington, DC May 6, 2013 - 4:48pm Addthis John Hale ...

  6. POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned...

    Energy Savers [EERE]

    POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB) Program POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB)...

  7. A Look at Health Care Buildings - Who owns and occupies them

    U.S. Energy Information Administration (EIA) Indexed Site

    Who Owns? Return to: A Look at Health Care Buildings How large are they? How many employees are there? Where are they located? How old are they? Who owns and occupies them? Are...

  8. Financial Statistics of Major U.S. Investor-Owned Electric Utilities

    Reports and Publications (EIA)

    1997-01-01

    1996 - Final issue. Presents summary and detailed financial accounting data on the investor-owned electric utilities.

  9. Financial statistics of selected publicly owned electric utilities 1989. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1991-02-06

    The Financial Statistics of Selected Publicly Owned Electric Utilities publication presents summary and detailed financial accounting data on the publicly owned electric utilities. The objective of the publication is to provide the Federal and State governments, industry, and the general public with data that can be used for policymaking and decision making purposes relating to publicly owned electric utility issues. 21 tabs.

  10. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    99-3119 Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement U. S. Department of Energy Revision 8 October 2014 This document supersedes Revision 7 of DOE/WIPP-99-3119. Working Copy Compliance Monitoring Implementation Plan DOE/WIPP-99-3119, Rev. 8 2 This document has been submitted as required to: U.S. Department of Energy Office of Scientific and Technical Information PO Box 62 Oak Ridge, TN 37831 (865) 576-8401 Additional information about this document may

  11. NREL: Measurements and Characterization - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us The National Renewable Energy Laboratory's (NREL's) Measurement and Characterization (M&C) division tests and analyzes thousands of photovoltaic (PV) material and device samples each year in addition to its own basic research projects. Industry, academia, government and other outside organizations are welcome to work with us and will benefit from the finest PV measurement and characterization capabilities in the world. We can make available a wide array of state-of-the-art

  12. Financial statistics of major US investor-owned electric utilities 1994

    SciTech Connect (OSTI)

    1995-12-01

    The Financial Statistics of Major U.S. Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State Governments, industry, and the general public with current and historical data that can be used for making policy and decisions relating to investor-owned electric utility issues.

  13. Women-Owned Small Business Webinar, June 20, 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Women-Owned Small Business Webinar, June 20, 2013 Women-Owned Small Business Webinar, June 20, 2013 The Office of Small and Disadvantaged Business Utilization hosted a webinar for women-owned small businesses on June 20, 2013, to provide overviews of major program offices in the Department of Energy and information about our development programs such as the Mentor Protégé Program. Download the following presentations from the webinar here: Office of Science Procurement Opportunities - Freda

  14. SBA Expands Access to Contracting Opportunities for Women-Owned Small

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Businesses | Department of Energy SBA Expands Access to Contracting Opportunities for Women-Owned Small Businesses SBA Expands Access to Contracting Opportunities for Women-Owned Small Businesses January 22, 2013 - 10:42am Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization Editor's note: This article was originally published on the Small Business Administration's website. Women-owned small businesses will have greater access to federal

  15. Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Y-12 National Security Complex Largest Federally Owned ... Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility Posted: August 13, 2013 - 12:01pm WASHINGTON - Building on President Obama's Climate Action Plan, which calls for steady, responsible steps to reduce carbon pollution, the Energy Department today broke ground on the nation's largest federally owned wind project at the Pantex Plant in Amarillo, Texas. Once completed, this five-turbine 11.5 megawatt project will

  16. Financial statistics of major U.S. investor-owned electric utilities 1993

    SciTech Connect (OSTI)

    Not Available

    1995-01-01

    The Financial Statistics of Major US Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues.

  17. Office of River Protection Women-Owned Small Business Contractor Receives

    Energy Savers [EERE]

    One-Year Extension | Department of Energy Office of River Protection Women-Owned Small Business Contractor Receives One-Year Extension Office of River Protection Women-Owned Small Business Contractor Receives One-Year Extension December 19, 2012 - 10:33am Addthis Richland - - The Energy Department's Office of River Protection announced the contract for Advanced Technologies and Laboratories International Inc. (ATL) has been extended for a second one-year option. ATL, a women-owned small

  18. Presentations, Women-Owned Small Business Forum (May 2013) | Department of

    Energy Savers [EERE]

    Energy Presentations, Women-Owned Small Business Forum (May 2013) Presentations, Women-Owned Small Business Forum (May 2013) Below, download presentations from the Women-Owned Small Business Opportunity Forum, held in Washington DC on May 23, 2013. Presented in partnership with the U.S. Department of Energy, the Small Business Administration, Women Impacting Public Policy, and American Express OPEN, this event featured critical information for small business owners who want to do business

  19. Alternative Fuels Data Center: Buying and Selling Pre-Owned Alternative

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Fuel and Advanced Vehicles Vehicles Printable Version Share this resource Send a link to Alternative Fuels Data Center: Buying and Selling Pre-Owned Alternative Fuel and Advanced Vehicles to someone by E-mail Share Alternative Fuels Data Center: Buying and Selling Pre-Owned Alternative Fuel and Advanced Vehicles on Facebook Tweet about Alternative Fuels Data Center: Buying and Selling Pre-Owned Alternative Fuel and Advanced Vehicles on Twitter Bookmark Alternative Fuels Data Center: Buying

  20. Financial Statistics of Major U.S. Publicly Owned Electric Utilities

    Reports and Publications (EIA)

    2001-01-01

    2000 - Final issue. Presents summary financial data for 1994 through 2000 and detailed financial data for 2000 on major publicly owned electric utilities.

  1. Google Drive for Work | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Google Drive for Work Google Drive for Work Computer.png Welcome to the U.S. Department of Energy Pilot Program, Google Drive for Work. Please read and sign the Terms of Use and Privacy Statement below. DISCLAIMER All data is owned by DOE and may be monitored, intercepted, recorded, read, copied, or captured in any manner and disclosed in any manner, by authorized personnel. THERE IS NO RIGHT OF PRIVACY IN THIS SYSTEM, and system personnel may give to law enforcement officials any potential

  2. EIS-0306: Treatment and Management of Sodium-Bonded Spent Nuclear Fuel

    Broader source: Energy.gov [DOE]

    DOE prepared a EIS that evaluated the potential environmental impacts of treatment and management of DOE-owned sodium bonded spent nuclear fuel.

  3. INL@Work Firefighter

    ScienceCinema (OSTI)

    Baron, Wendy

    2013-05-28

    Did you know INL has its own firefighting team? Its members help protect our remote 890-square-mile site from range fires and other incidents. Meet firefighter Wendy Baron, who was recently named Idaho's firefighter of the year.

  4. Fact #727: May 14, 2012 Nearly Twenty Percent of Households Own Three or

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Vehicles | Department of Energy 7: May 14, 2012 Nearly Twenty Percent of Households Own Three or More Vehicles Fact #727: May 14, 2012 Nearly Twenty Percent of Households Own Three or More Vehicles Household vehicle ownership has changed over the last six decades. In 1960, over twenty percent of households did not own a vehicle, but by 2010, that number fell to less than 10%. The number of households with three or more vehicles grew from 2% in 1960 to nearly 20% in 2010. Before 1990,

  5. BNL Technical Services Awarded Service-Disabled Veteran-Owned Small

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business of the Year | Department of Energy BNL Technical Services Awarded Service-Disabled Veteran-Owned Small Business of the Year BNL Technical Services Awarded Service-Disabled Veteran-Owned Small Business of the Year October 1, 2014 - 10:39am Addthis DOE Chief of Staff Kevin Knobloch (l) and DOE OSDBU Director John Hale III (r) present Service-Disabled Veteran-Owned Small Business of the Year to BNL Tech President and Chief Financial Officer Wilson Stevenson and BNL Tech Chief Executive

  6. Performance Excellence Partners Wins Woman-Owned Small Business of the Year

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Award at Small Business Forum & Expo | Department of Energy Performance Excellence Partners Wins Woman-Owned Small Business of the Year Award at Small Business Forum & Expo Performance Excellence Partners Wins Woman-Owned Small Business of the Year Award at Small Business Forum & Expo October 10, 2014 - 9:52am Addthis Rachel Ramirez, CEO & President of Performance Excellence Partners, accepts the Woman-Owned Small Business of the Year Award from Kevin Knobloch, DOE Chief of

  7. Hammerfest Strom UK co owned by StatoilHydro | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Hammerfest Strom UK co owned by StatoilHydro Address: The Innovation Centre 1 Ainslie Road Hillington Business Park Place: Glasgow Zip: G52 4RU Region:...

  8. Idaho - IDAPA 20.03.08 - Easements on State-Owned Lands | Open...

    Open Energy Info (EERE)

    20.03.08 - Easements on State-Owned LandsLegal Abstract This regulation outlines the law surrounding the granting of easements on state lands. Published NA Year Signed or Took...

  9. Working with SRNL - Our Facilities - HTRL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Technology Research Laboratory Working with SRNL Our Facilities - Hydrogen Technology Research Laboratory (HTRL) The Savannah River National Laboratory (SRNL) has teamed with Aiken County to establish a laboratory at the Savannah River Research Campus, a County-owned research park adjacent to the Savannah River Site. Aiken County designed, constructed and maintains the 60,000-square-foot Applied Research Center (ARC) and leases portions of that facility to house SRNL's Hydrogen

  10. Work with Argonne | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Argonne Technology Development and Commercialization A primary objective of the U.S. Department of Energy (DOE) laboratories is to promote the economic interests of the United States by facilitating development, transfer, and use of federally owned or originated technology to industry for public benefit and to provide industry, state and local governments, and other federal agencies access to DOE resources to help them solve challenges and seize opportunities. Argonne's Technology

  11. Final Technical Report. Sault Tribe Building Efficiency Audits of Tribally-Owned Governmental Buildings and Residential Tribal Housing

    SciTech Connect (OSTI)

    Holt, Jeffrey W.

    2015-03-27

    The Tribe is working to reduce energy consumption and expense in Tribally-owned governmental buildings and low income housing sites. In 2009, the Tribe applied to the U. S. Department of Energy for funding to conduct energy audits of Tribally-owned governmental buildings. Findings from the energy audits would define the extent and types of energy efficiency improvements needed, establish a basis for energy priorities, strategies and action plans, and provide a benchmark for measuring improvements from energy efficiency implementations. In 2010, the DOE awarded a grant in the amount of $95,238 to the Tribe to fund the energy audits of nine governmental buildings and to pay for travel expenses associated with attendance and participation at the DOE annual program reviews. In 2011, the Tribe applied for and was awarded a DOE grant in the amount of $75,509 to conduct energy audits of the remaining 30 Tribally-owned governmental buildings. Repeating mobilization steps performed during the first DOE energy audits grant, the Tribe initiated the second round of governmental building energy audits by completing energy auditor procurement. The selected energy auditor successfully passed DOE debarment and Sault Tribe background clearances. The energy audits contract was awarded to U. P. Engineers and Architects, Inc. of Sault Ste. Marie, Michigan. The Tribe continued mobilizing for the energy audits by providing the energy auditor with one year of electric, gas and water utility invoice copies per building, as well as supplemental building information, such as operating hours. The Tribe also contacted building occupants to coordinate scheduling for the on-site energy audit inspections and arranged for facilities management personnel to guide the energy auditor through the buildings and answer questions regarding building systems.

  12. Purple Bacteria Develops Its Own Form of Sunscreen | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) Purple Bacteria Develops Its Own Form of "Sunscreen" Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights Highlight Archives News & Events Publications History Contact BES Home 05.03.12 Purple Bacteria Develops Its Own Form of "Sunscreen" Print Text Size: A A A FeedbackShare Page Scientific Achievement Found that specific pigments in the light harvesting complex of a photosynthetic bacterium act primarily to protect the

  13. Energy Deputy Secretary Poneman Tours Minority-Owned Small Business in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Detroit | Department of Energy Deputy Secretary Poneman Tours Minority-Owned Small Business in Detroit Energy Deputy Secretary Poneman Tours Minority-Owned Small Business in Detroit May 22, 2012 - 10:37am Addthis Deputy Secretary of Energy Daniel Poneman meets with owners and workers at Diversified Chemical Technologies, a small business in Detroit, MI. | Energy Department photo Deputy Secretary of Energy Daniel Poneman meets with owners and workers at Diversified Chemical Technologies, a

  14. Family-Owned Restaurant Serves Up Huge Energy Savings | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Family-Owned Restaurant Serves Up Huge Energy Savings Family-Owned Restaurant Serves Up Huge Energy Savings May 8, 2013 - 2:27pm Addthis Energy efficiency upgrades helped the Athenian Corner reduce its operating costs and improved the restaurant's bottom line. | Photo courtesy of BetterBuildings Lowell Energy Upgrade program. Energy efficiency upgrades helped the Athenian Corner reduce its operating costs and improved the restaurant's bottom line. | Photo courtesy of BetterBuildings

  15. Government-Owned Firearms Inventory at the Nevada National Security Site

    Office of Environmental Management (EM)

    Government-Owned Firearms Inventory at the Nevada National Security Site INS-L-15-01 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 3, 2014 MEMORANDUM FOR THE MANAGER, NEVADA FIELD OFFICE FROM: Marilyn E. Richardson Acting Assistant Inspector General for the Office of Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Government-Owned Firearms Inventory

  16. DOE Awards Native American, Tribally-Owned Small Business Contract for

    Office of Environmental Management (EM)

    Support Services to Savannah River Operations Office | Department of Energy Native American, Tribally-Owned Small Business Contract for Support Services to Savannah River Operations Office DOE Awards Native American, Tribally-Owned Small Business Contract for Support Services to Savannah River Operations Office September 21, 2012 - 12:00pm Addthis Media Contact Bill Taylor, DOE bill.taylor@srs.gov 803-952-8564 Aiken, SC - The U.S. Department of Energy (DOE) today awarded a set- aside

  17. Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup |

    Energy Savers [EERE]

    Department of Energy Demolition Work Progresses Toward Goal of Completing Cleanup Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup January 14, 2016 - 12:20pm Addthis The sewage treatment facility before demolition. The sewage treatment facility before demolition. Debris from the sewage treatment facility. Debris from the sewage treatment facility. Site of the demolished sewage treatment facility. Site of the demolished sewage treatment facility. The sewage treatment

  18. Federal Utility Partnership Working Group Industry Commitment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Federal Utility Partnership Working Group Industry Commitment Federal Utility Partnership Working Group Industry Commitment Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of 1992 and subsequent executive orders. Federal agencies can contact Federal Utility Partnership Working Group utility partners for more information on assistance.

  19. Financial statistics of major U.S. publicly owned electric utilities 1997

    SciTech Connect (OSTI)

    1998-12-01

    The 1997 edition of the ``Financial Statistics of Major U.S. Publicly Owned Electric Utilities`` publication presents 5 years (1993 through 1997) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator (Tables 3 through 11) and nongenerator (Tables 12 through 20) summaries are presented in this publication. Five years of summary financial data are provided (Tables 5 through 11 and 14 through 20). Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided in Appendix C. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, operating revenue, and electric energy account data. The primary source of publicly owned financial data is the Form EIA-412, ``Annual Report of Public Electric Utilities.`` Public electric utilities file this survey on a fiscal year basis, in conformance with their recordkeeping practices. The EIA undertook a review of the Form EIA-412 submissions to determine if alternative classifications of publicly owned electric utilities would permit the inclusion of all respondents. The review indicated that financial indicators differ most according to whether or not a publicly owned electric utility generates electricity. Therefore, the main body of the report provides summary information in generator/nongenerator classifications. 2 figs., 101 tabs.

  20. POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business (WOSB) Program | Department of Energy POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB) Program POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB) Program Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at lawrence.butler@hq.doe.gov. PDF icon Policy Flash 13 Class Deviation.pdf PDF icon CAAC Letter 2013-03.pdf

  1. May 23 ChallengeHER Women Owned Small Business Event in Washington, DC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy May 23 ChallengeHER Women Owned Small Business Event in Washington, DC May 23 ChallengeHER Women Owned Small Business Event in Washington, DC May 6, 2013 - 4:48pm Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization This April, the Small Business Administration (SBA) announced the ChallengeHER Campaign. The campaign is an exciting new initiative that leverages the resources of SBA, Women Impacting Public Policy, and

  2. Beating Nature at her Own Game? | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Beating Nature at her Own Game? News News Home Featured Articles 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Headlines Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 08.24.11 Beating Nature at her Own Game? New catalyst speeds conversion of electricity to hydrogen fuel. Print Text Size: A A A

  3. Do You Have Your Own Tips for Saving Fuel? | Department of Energy

    Office of Environmental Management (EM)

    Have Your Own Tips for Saving Fuel? Do You Have Your Own Tips for Saving Fuel? May 11, 2012 - 1:37pm Addthis Earlier this week, Amanda shared a checklist on Fueleconomy.gov that helps you keep your car well maintained. Keeping your car well maintained is one way to make sure that it's not using more gas than it needs to. Do you have any other ideas for saving gas this summer? You have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers.

  4. July 28, 2010, Reducing Barriers to Commercialization; Helping Universities, Industry and Federal Labs Work Together

    Office of Environmental Management (EM)

    Brian Darmody AURP President Associate Vice President for Research and Economic Development University of Maryland Reducing Barriers to Commercialization; Helping Universities, Industry and Federal Labs Work Together Universities, Industry, and Government Labs Working Together: Cultural Differences Adapted from chart created by Matt Doyle of Proctor & Gamble University Industry Government Labs Intellectual Property (IP) Rights Want to own IP rights Want to own IP rights Generally, Bayh- Dole

  5. Sandia National Laboratories: Working with Sandia: Procurement: Potential

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Suppliers: Small Business: Socioeconomic Categories Small Business Opportunities Potential Suppliers Become a Supplier Small Business Small Business Categories Current Suppliers What Does Sandia Buy? Working with Sandia Small Business Categories Small businesses we work with should have the following characteristics: An independently owned and operated entity. Not dominant in the field of operation in which it is bidding on government contracts. Meets criteria concerning number of employees

  6. 90 MW build/own/operate gas turbine combined cycle cogeneration project with sludge drying plant

    SciTech Connect (OSTI)

    Schroppe, J.T.

    1986-04-01

    This paper will discuss some of the unique aspects of a build/own/operate cogeneration project for an oil refinery in which Foster Wheeler is involved. The organization is constructing a 90 MW plant that will supply 55 MW and 160,000 lb/hr of 600 psi, 700F steam to the Tosco Corporation's 130,000 bd Avon Oil Refinery in Martinez, California. (The refinery is located about 45 miles northeast of San Francisco.) Surplus power production will be sold to the local utility, Pacific Gas and Electric Co. (PG and E). Many of the aspects of this project took on a different perspective, since the contractor would build, own and operate the plant.

  7. DOE Awards Native American, Tribally-Owned Small Business Contract for

    Broader source: Energy.gov (indexed) [DOE]

    Support Services to Savannah River Operations Office | Department of Energy John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization Editor's Note: This announcement was originally posted on the Office of Environmental Management's website. Today the Energyy Department awarded a $20 million contact (estimated value) to a Native American Tribally-Owned Section 8(a) company for administrative support services and information technology support at our

  8. NREL Reports Examine Economic Trade-offs of Owning versus Leasing a Solar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photovoltaic System - News Releases | NREL Reports Examine Economic Trade-offs of Owning versus Leasing a Solar Photovoltaic System January 21, 2015 Two new reports from the Energy Department's National Renewable Energy Laboratory (NREL) examine the economic options customers face when deciding how to finance commercial or residential solar energy systems. NREL analysts found that businesses that use low-cost financing to purchase a photovoltaic (PV) system and homeowners who use

  9. OSCARS Collaborative Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OSCARS Collaborative Work Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers...

  10. Treatment Deployment Evaluation Tool

    SciTech Connect (OSTI)

    Rynearson, Michael Ardel; Plum, Martin Michael

    1999-08-01

    The U.S. Department of Energy (DOE) is responsible for the final disposition of legacy spent nuclear fuel (SNF). As a response, DOE's National Spent Nuclear Fuel Program (NSNFP) has been given the responsibility for the disposition of DOE -owned SNF. Many treatment technologies have been identified to treat some forms of SNF so that the resulting treated product is acceptable by the disposition site. One of these promising treatment processes is the electrometallurgical treatment (EMT) currently in development; a second is an Acid Wash Decladding process. The NSNFP has been tasked with identifying possible strategies for the deployment of these treatment processes in the event that the treatment path is deemed necessary. To support the siting studies of these strategies, economic evaluations are being performed to identify the least-cost deployment path. This model (tool) was developed to consider the full scope of costs, technical feasibility, process material disposition, and schedule attributes over the life of each deployment alternative. Using standard personal computer (PC) software, the model was developed as a comprehensive technology economic assessment tool using a Life-Cycle Cost (LCC) analysis methodology. Model development was planned as a systematic, iterative process of identifying and bounding the required activities to dispose of SNF. To support the evaluation process, activities are decomposed into lower level, easier to estimate activities. Sensitivity studies can then be performed on these activities, defining cost issues and testing results against the originally stated problem.

  11. Financial statistics of major U.S. publicly owned electric utilities 1995

    SciTech Connect (OSTI)

    1997-07-01

    The 1995 Edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents 5 years (1991 through 1995) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator (Tables 3 through 11) and nongenerator (Tables 12 through 20) summaries are presented in this publication. Five years of summary financial data are provided (Tables 5 through 11 and 14 through 20). Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided in Appendix C. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. 9 figs., 87 tabs.

  12. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  13. Selecting chemical treatment programs

    SciTech Connect (OSTI)

    Miller, J.E. )

    1988-09-01

    Many process equipment performance and reliability problems can be solved economically by the proper selection and application of chemical treatment programs. It is important to choose an experienced chemical vendor and to work closely with the vendor to develop a good chemical treatment program. This requires devoting sufficient manpower to ensure that the treatment program development is thorough and timely. After the treatment program is installed, the system operation and performance should be routinely monitored to ensure that expected benefits are achieved and unexpected problems do not develop.

  14. Service and Repair Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service and Repair Work Whenever on-site service or repair work needs to be done, a Procurement Work Sheet (PWS) must be completed, and possibly an IWS, authorized and released. PWS is required for service work even if there are no apparent hazards. PWS is required for work in Jupiter Laser Facility even if you have a PWS for service/repairs in another location. To complete a PWS for service work in Jupiter Laser Facility, please contact Sean Holte (2-3905, pager #05312). Notify Brent Stuart and

  15. To Own or Lease Solar: Understanding Commercial Retailers' Decisions to Use Alternative Financing Models

    SciTech Connect (OSTI)

    Feldman, D.; Margolis, R.

    2014-12-01

    This report examines the tradeoffs among financing methods for businesses installing onsite photovoltaics (PV). We present case studies of PV financing strategies used by two large commercial retailers that have deployed substantial U.S. PV capacity: IKEA, which owns its PV, and Staples, which purchases power generated from onsite PV systems through power purchase agreements (PPAs). We also analyze the financial considerations that influence any company's choice of PV financing strategy. Our goal in this report is to clarify the financial and institutional costs and benefits of financing strategies and to inform other companies that are considering launching or expanding similar PV programs.

  16. n your own words, write down what. happened in the event. include env informatio

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    n your own words, write down what. happened in the event. include env information from before the event began unti after it was ovier, Incluce the folowin. 1. ant conditions as you know them odror to the event 2. Any indication that a problem exised 3. List any equipment malfunctions 4. What you ware doing Immediately prior to the event 5. Your actions in response to the indications 6. 'List any Inadequacies In the procedures, practices, or training NOTE: IIt additional sheets are used sign,

  17. Mixed Waste Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-09

    The treatment of mixed waste remains one of this country`s most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country`s largest mixed waste generator, responsible for 95 percent of the Nation`s mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE`s earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies.

  18. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

  19. STATEMENT OF WORK

    National Nuclear Security Administration (NNSA)

    PART III - SECTION J APPENDIX B STATEMENT OF WORK Table of Contents 1.0 General.................................................................................................................... 273 2.0 Laboratory Mission and Scope of Work. ................................................................ 274 3.0 Science & Technology. ........................................................................................... 275 3.1 Defense Programs.

  20. Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14

    The order provides requirements and responsibilities for administering work force discipline and corrective actions. Supersedes DOE O 3750.1.

  1. Interagency Sustainability Working Group

    Broader source: Energy.gov [DOE]

    The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

  2. Incentive regulation of investor-owned nuclear power plants by public utility regulators. Revision 1

    SciTech Connect (OSTI)

    McKinney, M.D.; Seely, H.E.; Merritt, C.R.; Baker, D.C.

    1995-04-01

    The US Nuclear Regulatory Commission (NRC) periodically surveys the Federal Energy Regulatory Commission (FERC) and state regulatory commissions that regulate utility owners of nuclear power plants. The NRC is interested in identifying states that have established economic or performance incentive programs applicable to nuclear power plants, how the programs are being implemented, and in determining the financial impact of the programs on the utilities. The NRC interest stems from the fact that such programs have the potential to adversely affect the safety of nuclear power plants. The current report is an update of NUREG/CR-5975, Incentive Regulation of Investor-Owned Nuclear Power Plants by Public Utility Regulators, published in January 1993. The information in this report was obtained from interviews conducted with each state regulatory agency that administers an incentive program and each utility that owns at least 10% of an affected nuclear power plant. The agreements, orders, and settlements that form the basis for each incentive program were reviewed as required. The interviews and supporting documentation form the basis for the individual state reports describing the structure and financial impact of each incentive program.

  3. LANL highlights explosives work | National Nuclear Security Administra...

    National Nuclear Security Administration (NNSA)

    leader in explosives applications. It will feature LANL's work with explosives, from synthesis of new molecules to waste treatment. The exhibit also examines a variety of...

  4. ORISE: Working with ORISE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oak Ridge Institute for Science Education Working with ORISE If you are interested in learning about how your agency can utilize the capabilities of the Oak Ridge Institute for Science and Education (ORISE) through a Work for Others agreement or a procurement contract, or if you are looking for career opportunities, the following information provides an explanation of how to work with ORISE. If you do not see an option that applies to your needs, please contact ORISE General Information.

  5. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  6. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  7. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cells, viruses), plant or soil samples (USDA quarantines), recombinant DNA, or blood-borne pathogen. Biological Use Authorization The great majority of biological work at...

  8. INL @ work: Archaeologist

    ScienceCinema (OSTI)

    Lowrey, Dino

    2013-05-28

    INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

  9. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for proper development and review time. Training All resident LBNL users (those whose work authorization includes a JHA) must take the standard LBNL training courses for...

  10. Photoelectrochemical Working Group

    Broader source: Energy.gov [DOE]

    The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water...

  11. Revenue and earnings performance masked continuing investor-owned utility problems

    SciTech Connect (OSTI)

    Lincicome, R.A.

    1983-06-01

    The 1982 increase in revenues and net income for the top 100 electric utilities is misleading because the figure is distorted by the allowance for funds used during construction (AFUDC), which overstates the real dollar strength of most investor-owned utilities. A random sampling of profit and loss statements shows that companies heavily involved in plant construction can have AFUDC over 100% of net income. The average is 50% of utility earnings, while cash dividends run 75% of earnings. The problem is short-term, however, and will diminish as construction is completed. A summary of utility performance presents earnings growth statistics, sales data and comparisons, financial statistics, and income statistics and comparisons. A summary financial table lists the 100 utilities in alphabetical order. 7 tables. (DCK)

  12. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-20

    It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

  13. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

  14. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

  15. Purple Bacteria Develops Its Own Form of Sunscreen | U.S. DOE...

    Office of Science (SC) Website

    Support: Work was performed at University of Washington University of St. Louis and supported by the Photosynthetic Antenna Research Center, an EFRC led by Robert Blankenship at ...

  16. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trails » Trails Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some

  17. How It Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How It Works Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Read More... Fasterdata IPv6 Network Network Performance Tools The ESnet Engineering Team Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net How It Works

  18. Work/Life Balance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workplace » Work/Life Balance /careers/_assets/images/careers-icon.jpg Work/Life Balance Explore the multiple dimensions of a career at Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. What our employees say: Health & Wellness "The Lab pays 80 percent of my family's medical premiums with Blue Cross Blue Shield of New Mexico." Retirement & Savings "With the Lab matching my

  19. Who Owns Renewable Energy Certificates? An Exploration of PolicyOptions and Practice

    SciTech Connect (OSTI)

    Holt, Edward A.; Wiser, Ryan; Bolinger, Mark

    2006-04-05

    Renewable energy certificates (RECs) represent the bundle of information that describes the characteristics of renewable electricity generation, and may be (and increasingly are) sold separately from the underlying electricity itself. RECs are a relatively new phenomenon, emerging as a tradable commodity in voluntary markets in the late 1990s, and gaining strength as a means of compliance with various state policy requirements affecting renewable generation in the early 2000s (Holt and Bird 2005). Twenty states and Washington, D.C. now have mandatory renewables portfolio standard (RPS) obligations, and most of these may be satisfied by owning and retiring RECs. Many states also have fuel source and emissions disclosure requirements, for which RECs are useful. Even where state policy does not allow unbundled and fully tradable RECs to meet these requirements, RECs may still be used as an accounting and verification tool (REC tracking systems are in place or under development in many regions of the U.S.). These applications, plus REC trading activity in support of voluntary green claims, give rise to potential ''double counting'' to the extent that the purchaser of the RECs and the purchaser of the underlying electricity both make claims to the renewable energy attributes of the facility in question (Hamrin and Wingate 2003). When renewable electricity is sold and purchased, an important question therefore arises: ''Who owns the RECs created by the generation of renewable energy?'' In voluntary transactions, most agree that the question of REC ownership can and should be negotiated between the buyer and the seller privately, and should be clearly established by contract. Claims about purchasing renewable energy should only be made if REC ownership can be documented. In many other cases, however, renewable energy transactions are either mandated or encouraged through state or federal policy. In these cases, the issue of REC ownership must often be answered by legislative or regulatory authorities. Some renewable energy contracts pre-date the existence of RECs, however, and in these cases the disposition of RECs is often unclear. Similarly, because of the recent appearance of RECs, legislation and regulation mandating the purchase of renewable energy has sometimes been silent on the disposition of the RECs associated with that generation. The resulting uncertainty in REC ownership has hindered the development of robust REC markets and has, in some cases, led to contention between buyers and sellers of renewable generation. The purpose of this report is to provide information and insight to state policy-makers, utility regulators, and others about different approaches to clarifying the ownership of RECs. We focus exclusively on three distinct areas in which REC ownership issues have arisen: (1) Qualifying Facilities (QFs) that sell their generation under the Public Utility Regulatory Policies Act (PURPA) of 1978; (2) Customer-owned generation that benefits from state net metering rules; and (3) Generation facilities that receive financial incentives from state or utility funds. This is a survey report. It reviews how both the federal government and states have addressed these issues to date, and highlights the arguments that have been raised for different REC ownership dispositions. Our aim is to describe the arguments on each side, and the context for the debates that are occurring. We do not, in this report, provide a list of policy recommendations for how policymakers should be addressing these issues.

  20. Clean Energy Works

    Broader source: Energy.gov [DOE]

    Through Clean Energy Works, homeowners can finance up to $30,000 at a fixed interest rate for home energy efficiency retrofits for a variety of measures. Customers have varying lender and loan op...

  1. Working Group Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K.

  2. Macro Industrial Working Group

    Gasoline and Diesel Fuel Update (EIA)

    September 29, 2014 | Washington, DC WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Industrial team preliminary results for AEO2015 Overview AEO2015 2 Industrial Team Washington DC, September 29, 2014 WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE * AEO2015 is a "Lite" year - New ethane/propane pricing model only major update - Major side cases released with Reference case

  3. Partnerships & Sponsored Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Partnerships & Sponsored Work Partnerships & Sponsored Work Los Alamos scientists and engineers conduct basic research across a wide range of scientific areas to support our national security mission. Many of the technologies, processes, and special technical expertise we have developed has been applied to solving problems in the private sector through mutually beneficial, technology partnerships. Contact Cooperative Research & Development Agreements (CRADA) CRADA Team Email

  4. Working With Us | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working With Us Join us in building a clean energy future. NREL offers many opportunities to industry, organizations, government, researchers, businesses, students, educators, and vendors. At NREL, we work with organizations large and small through research partnerships, licensing of NREL technologies, support for cleantech stakeholders, and fostering the clean energy economy. Join us to accelerate the movement of renewable energy and energy-efficient solutions into practical applications.

  5. Fermilab: Science at Work

    ScienceCinema (OSTI)

    Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

    2013-02-14

    Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

  6. Y-12 weapons work expands in 1950s

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    weapons work expands in 1950s During the era immediately following the end of World War II, as early as 1946, evidence of the Cold War was emerging. Russia was working on its own nuclear weapon, the United States was trying to control the spread of nuclear weapons, but at the same time releasing much of the technology trying to promote peaceful uses of atomic energy. During the late 1940s and early 1950s, the Graphite Reactor at Oak Ridge National Laboratory was used to create medical isotopes

  7. State-owned companies dominate list of largest non-U. S. producers

    SciTech Connect (OSTI)

    Beck, R.J.; Williamson, M.

    1994-09-05

    Because state-owned oil and gas companies dominate Oil and Gas Journal's list of largest non-US producers, data aren't fully comparable with those of the OGJ300. Many state companies report only production and reserves, with little or no financial data. Companies on the OGJ100, therefore, cannot be ranked by assets or revenues. Instead, they are listed by regions, based on location of corporate headquarters. There was no change in makeup of the top 20 holders of crude oil reserves. These companies' reserves totaled 872.3 billion bbl in 1993. The top 20 non-US companies now control 87.3 % of total world crude oil reserves, according to OGJ estimates. This is up marginally from 87.2 % of total world oil reserves in 1992. The top 20 had 87.7 % of total world reserves in 1991 and 85.5 % in 1990. The table lists company name, total assets, revenues, net income, capital and exploratory expenditures, worldwide oil production, gas production, oil and gas reserves worldwide.

  8. Facilitating communities in designing and using their own community health impact assessment tool

    SciTech Connect (OSTI)

    Cameron, Colleen; Ghosh, Sebanti; Eaton, Susan L.

    2011-07-15

    Reducing health inequities and improving the health of communities require an informed public that is aware of the social determinants of health and how policies and programs have an impact on the health of their communities. People Assessing Their Health (PATH) is a process that uses community-driven health impact assessment to build the capacity of people to become active participants in the decisions that affect the well-being of their community. The PATH process is both a health promotion and a community development approach that builds people's ability to bring critical analysis to a situation and to engage in effective social action to bring about desired change. Because it increases analytical skills and provides communities with their own unique tool to assess the potential impact of projects, programs or policies on the health and well-being of their community it is an empowering process. PATH was originally used in three communities in northeastern Nova Scotia, Canada in 1996 when the Canadian health care system was being restructured to a more decentralized system. Since then it has been used in other communities in Nova Scotia and India. This paper will describe the PATH process and the use of the community health impact assessment as well as the methodology used in the PATH process. The lessons learned from PATH's experiences of building capacity among the community in Canada and India will be presented.

  9. Work Force Retention Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Retention Work Group Charter Work Force Retention Work Group Charter The Work force Retention Work Group is established to support the Department's critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE's national security mission are reaching retirement age. PDF icon Work Force Retention Work Group Charter More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Training

  10. Gross alpha analytical modifications that improve wastewater treatment compliance

    SciTech Connect (OSTI)

    Tucker, B.J.; Arndt, S.

    2007-07-01

    This paper will propose an improvement to the gross alpha measurement that will provide more accurate gross alpha determinations and thus allow for more efficient and cost-effective treatment of site wastewaters. To evaluate the influence of salts that may be present in wastewater samples from a potentially broad range of environmental conditions, two types of efficiency curves were developed, each using a thorium-230 (Th-230) standard spike. Two different aqueous salt solutions were evaluated, one using sodium chloride, and one using salts from tap water drawn from the Bergen County, New Jersey Publicly Owned Treatment Works (POTW). For each curve, 13 to 17 solutions were prepared, each with the same concentration of Th-230 spike, but differing in the total amount of salt in the range of 0 to 100 mg. The attenuation coefficients were evaluated for the two salt types by plotting the natural log of the counted efficiencies vs. the weight of the sample's dried residue retained on the planchet. The results show that the range of the slopes for each of the attenuation curves varied by approximately a factor of 2.5. In order to better ensure the accuracy of results, and thus verify compliance with the gross alpha wastewater effluent criterion, projects depending on gross alpha measurements of environmental waters and wastewaters should employ gross alpha efficiency curves prepared with salts that mimic, as closely as possible, the salt content of the aqueous environmental matrix. (authors)

  11. Exhibit G / working draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Off-site (Rev 5, 2/28/2014) P.R. No. * Date * Page 1 of 2 Subcontract No. or PO No. * EXHIBIT G OFF-SITE SECURITY REQUIREMENTS G1.0 Definitions and Acronyms (Feb 2014) Definitions and acronyms may be accessed electronically at http://www.lanl.gov/resources/_assets/docs/Exhibit-G/exhibit-g-definitions-acronyms-green.pdf G2.0 Statements Applicable To Scope of Work (July 2013) CONTRACTOR believes that all of the statements listed below are factually correct and applicable to the scope of work (SOW)

  12. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in

  13. Work breakdown structure guide

    SciTech Connect (OSTI)

    Not Available

    1987-02-06

    Utilization of the work breakdown structure (WBS) technique is an effective aid in managing Department of Energy (DOE) programs and projects. The technique provides a framework for project management by focusing on the products that are being developed or constructed to solve technical problems. It assists both DOE and contractors in fulfilling their management responsibilities. This document provides guidance for use of the WBS technique for product oriented work identification and definition. It is one in a series of policy and guidance documents supporting DOE's project manaagement system.

  14. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need ...

  15. Durability Working Group

    Broader source: Energy.gov [DOE]

    Description, technical targets, meeting archives, and contacts for the DOE Durability Working Group, which meets twice per year to exchange information, create synergies, and collaboratively develop both an understanding of and tools for studying degradation mechanisms of polymer electrolyte fuel cell stacks.

  16. Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-03-23

    The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

  17. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects: ---------------------------------------------------------------------------------------------------------- 1:00 pm - 1:05 pm Understanding and Improving CRM and GCM Simulations of Cloud Systems with ARM Observations (Xiaoqing Wu, Iowa State University) 1:05 pm - 1:10 pm Interactions of Cumulus Convection and the Boundary Layer at the Southern Great Plains ACRF (Steve Krueger, University of

  18. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 | Energy Efficiency and Renewable Energy eere.energy.gov ACI Detroit Quality Work Plan Update April 2014 QWP: Background Culmination of a multi-year investment aimed at demonstrating quality and accountability in the WAP Taking action on lessons learned through various quality assurance reviews Establishing WAP as a national leader in technical resources and quality assurance Improving long term sustainability by building the foundation of the national industry with WAP at the core 2

  19. Buildings Sector Working Group

    Gasoline and Diesel Fuel Update (EIA)

    July 22, 2013 AEO2014 Model Development For discussion purposes only Not for citation Overview Builldings Working Group Forrestal 2E-069 / July 22, 2013 2 * Residential projects - RECS update - Lighting model - Equipment, shell subsidies - ENERGY STAR benchmarking - Housing stock formation and decay * Commercial projects - Major end-use capacity factors - Hurdle rates - ENERGY STAR buildings * Both sectors - Consumer behavior workshop - Comparisons to STEO - AER  MER - Usual annual updates -

  20. Emergency Preparedness Working

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 24, 2015 Emergency Preparedness Working Group (EPWG) Grant * Nevada Field Office funds the EPWG grant based on $.50 per cubic foot of low-level/mixed low-level waste disposed at the Nevada National Security Site * EPWG consists of six Nevada counties: Clark, Elko, Esmeralda, Lincoln, Nye, and White Pine * EPWG addresses grant administration issues and any cross-cutting emergency related questions that incorporate grant funding or are required to attain operations level emergency response

  1. The multiple market-exposure of waste management companies: A case study of two Swedish municipally owned companies

    SciTech Connect (OSTI)

    Corvellec, Herve; Bramryd, Torleif

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Swedish municipally owned waste management companies are active on political, material, technical, and commercial markets. Black-Right-Pointing-Pointer These markets differ in kind and their demands follow different logics. Black-Right-Pointing-Pointer These markets affect the public service, processing, and marketing of Swedish waste management. Black-Right-Pointing-Pointer Articulating these markets is a strategic challenge for Swedish municipally owned waste management. - Abstract: This paper describes how the business model of two leading Swedish municipally owned solid waste management companies exposes them to four different but related markets: a political market in which their legitimacy as an organization is determined; a waste-as-material market that determines their access to waste as a process input; a technical market in which these companies choose what waste processing technique to use; and a commercial market in which they market their products. Each of these markets has a logic of its own. Managing these logics and articulating the interrelationships between these markets is a key strategic challenge for these companies.

  2. Memorandum requesting a clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility

    Broader source: Energy.gov [DOE]

    Memorandum requesting a clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility may be considered a laser manufacturer and subject to FDA laser manufacturer requirements and other points of interpretation of the FDA Exemption Letter, 78EL-01DOE (DOE exemption or exemption) by the LSSG for GOCG facilities.

  3. Actual Versus Estimated Utility Factor of a Large Set of Privately Owned Chevrolet Volts

    SciTech Connect (OSTI)

    John Smart; Thomas Bradley; Stephen Schey

    2014-04-01

    In order to determine the overall fuel economy of a plug-in hybrid electric vehicle (PHEV), the amount of operation in charge depleting (CD) versus charge sustaining modes must be determined. Mode of operation is predominantly dependent on customer usage of the vehicle and is therefore highly variable. The utility factor (UF) concept was developed to quantify the distance a group of vehicles has traveled or may travel in CD mode. SAE J2841 presents a UF calculation method based on data collected from travel surveys of conventional vehicles. UF estimates have been used in a variety of areas, including the calculation of window sticker fuel economy, policy decisions, and vehicle design determination. The EV Project, a plug-in electric vehicle charging infrastructure demonstration being conducted across the United States, provides the opportunity to determine the real-world UF of a large group of privately owned Chevrolet Volt extended range electric vehicles. Using data collected from Volts enrolled in The EV Project, this paper compares the real-world UF of two groups of Chevrolet Volts to estimated UF's based on J2841. The actual observed fleet utility factors (FUF) for the MY2011/2012 and MY2013 Volt groups studied were observed to be 72% and 74%, respectively. Using the EPA CD ranges, the method prescribed by J2841 estimates a FUF of 65% and 68% for the MY2011/2012 and MY2013 Volt groups, respectively. Volt drivers achieved higher percentages of distance traveled in EV mode for two reasons. First, they had fewer long-distance travel days than drivers in the national travel survey referenced by J2841. Second, they charged more frequently than the J2841 assumption of once per day - drivers of Volts in this study averaged over 1.4 charging events per day. Although actual CD range varied widely as driving conditions varied, the average CD ranges for the two Volt groups studied matched the EPA CD range estimates, so CD range variation did not affect FUF results.

  4. Better Buildings Working with Utilities Peer Exchange Call: Kick-off Call Slides and Discussion Summary, April 21, 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with Utilities Peer Exchange Call: Kick-off Call Slides and Discussion Summary Agenda * What are peer exchange calls? * Call logistics and attendance * Key topics in working with utilities * Grant project go-around: * What is the institutional relationship between your BB project and utilities? * What kind of utility are you working with (e.g., municipal, investor-owned, etc.)? * What are some key challenges or needs related to working with utilities? * Any successful strategies? * Next

  5. 6-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 9, 2011 Page 1 of 1 RIVER & PLATEAU COMMITTEE - 6 MONTH WORK PLAN January * River Corridor Cleanup, using 100 K as an Example * Draft A, 100 K Proposed Plan * PW-1,3,6/CW-5 ROD: Draft letter February * TPA Milestone Delays for Central Plateau - 30 month delay on interim milestones driven by funding. Information session. * TRU Burial Grounds in 200 W (PU Waste Excavated from Z9 in 1973) * Barriers discussion (follow up from workshop) * 300 Area RI/FS (document due in December) *

  6. Work Force Restructuring Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the

  7. How ICF Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    science / icf How ICF Works Shiva Laser When the 20-beam Shiva laser was completed in 1978, it was the world's most powerful laser. It delivered more than ten kilojoules of energy in less than a billionth of a second in its first full-power firing. About the size of a football field, Shiva was the latest in a series of laser systems built over two decades, each five to ten times more powerful than its predecessor. Since the late 1940s, researchers have used magnetic fields to confine hot,

  8. How Lasers Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Lasers Work "Laser" is an acronym for light amplification by stimulated emission of radiation. A laser is created when the electrons in atoms in special glasses, crystals, or gases absorb energy from an electrical current or another laser and become "excited." The excited electrons move from a lower-energy orbit to a higher-energy orbit around the atom's nucleus. When they return to their normal or "ground" state, the electrons emit photons (particles of light).

  9. How NIF Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How NIF Works A weak laser pulse-about 1 billionth of a joule-is created, split, and carried on optical fibers to 48 preamplifiers that increase the pulse's energy by a factor of 10 billion, to a few joules. The 48 beams are then split into four beams each for injection into the 192 main laser amplifier beamlines. Each beam zooms through two systems of large glass amplifiers, first through the power amplifier and then into the main amplifier. In the main amplifier, a special optical switch traps

  10. How it works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How it works MINERvA is a particle physics experiment, located at Fermi National Accelerator Laboratory in Batavia, Illinois. MINERvA was designed to perform high-precision measurements of neutrino interactions on a wide variety of materials, including water, helium, carbon, iron, lead, and plastic. MINERvA is located 100 meters underground, and sits directly in front of the MINOS near detector. The source of MINERvA's neutrino beam is the Neutrinos at the Main Injector beamline, or NuMI. NuMI

  11. HANFORD ENGINEER WORKS

    Office of Legacy Management (LM)

    HANFORD ENGINEER WORKS IJd *P-t - - ~~~ssiticatiC+n cwcetted rat G.E. NUCLEONICS PROJECT xi I ~@L.%&~--G-ENERAI,@ ELECTRIC z ,m ._.__.-. _ I--..-. By Authority of. COMPANY ._ Atmic Energy Commission Office of Hanford Dire&xl Operations Riohland, Washington Attention; Mr. Carleton Shugg, Manager ./ ALPKA-ROLLED EL'GIL%I jw -879 ' . *_ a. f' Richland, Washington February 6, 1948 , Thla Dclc.Jv-<en! :-; . ' - -*...-- f_ ~~~.s No .__. ._. .s / ~. - J-LccIp%. Fr:*? fi This will con&rm

  12. Better Buildings Neighborhood Program Working with Utilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    as each entity had certain requirements for their own branding on communications material. ... and PSE have created a partnership for marketing the program. 08022012 7 Bainbridge's ...

  13. How NIF Works

    ScienceCinema (OSTI)

    None

    2010-09-01

    The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

  14. Working Group Report: Sensors

    SciTech Connect (OSTI)

    Artuso, M.; et al.,

    2013-10-18

    Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

  15. Panasonic Electric Works Ltd formerly Matsushita Electric Works...

    Open Energy Info (EERE)

    Electric Works Ltd (formerly Matsushita Electric Works) Place: Kadoma-shi, Osaka, Japan Zip: 571-8686 Product: Japanese manufacturer of mainly electric appliances including...

  16. CRAD, Work Controls Assessment Plan

    Broader source: Energy.gov [DOE]

    Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed.

  17. Clean Energy Works Oregon (CEWO)

    Broader source: Energy.gov [DOE]

    Presents Clean Energy Works Oregon's program background and the four easy steps to lender selection.

  18. High Temperature Membrane Working Group

    Broader source: Energy.gov [DOE]

    This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007.

  19. Video Shoot Scope of Work

    Broader source: Energy.gov [DOE]

    Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  20. Radiation Safety Work Control Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form #: Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers mitigate the radiological hazards introduced by the proposed work? Yes No (b) Can the closed state of the beam line injection stoppers be assured during the proposed work (ie., work does NOT involve injection stoppers or associated HPS)? Yes No If the answers to both questions are yes, the work can be performed safely

  1. ARM - Engineering Work Request & Engineering Work Order Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control

  2. Work for Others Program Interagency Work | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Presented to the Commission to Review the Effectiveness of National Energy Laboratories by Devon Streit, Associate Director, Laboratory Policy and Evaluation, Office of Science. PDF icon Work For Others Program, Interagency Work More Documents & Publications DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) Aligned Partnerships Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

  3. Thermomechanical treatment of alloys

    DOE Patents [OSTI]

    Bates, John F. (Ogden, UT); Brager, Howard R. (Richland, WA); Paxton, Michael M. (Gaithersburg, MD)

    1983-01-01

    An article of an alloy of AISI 316 stainless steel is reduced in size to predetermined dimensions by cold working in repeated steps. Before the last reduction step the article is annealed by heating within a temperature range, specifically between 1010.degree. C. and 1038.degree. C. for a time interval between 90 and 60 seconds depending on the actual temperature. By this treatment the swelling under neutron bombardment by epithermal neutrons is reduced while substantial recrystallization does not occur in actual use for a time interval of at least of the order of 5000 hours.

  4. Quality Work Plan Training Requirement

    Broader source: Energy.gov [DOE]

    Weatherization Assistance Program's comprehensive Quality Work Plan requirements and resources to meet this obligation in the field.

  5. Federal Utility Partnership Working Group Industry Commitment

    Broader source: Energy.gov [DOE]

    Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

  6. Small business to conduct characterization work

    Broader source: Energy.gov [DOE]

    DOE's Oak Ridge Office of Environmental Management (EM) recently awarded a task order to Alliant Corporation, a service-disabled veteran owned small business, to perform characterization at the proposed site for the future Environmental Management Disposal Facility.

  7. Working Together to Reduce Our Environmental Footprint

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    computers, cell phones, TVs, printers, VCRs, cameras, and unwanted personally-owned electronic equipment. THURSDAY April 23 12:00 P.M. - 1:00 P.M. * Seasonal Landscapes at...

  8. Many Voices Working for the Community

    Office of Environmental Management (EM)

    in attendance at the March meeting). The meeting adjourned at 7:50 p.m. Action Items Closed. 1. Ms. Jackson will determine the number of woman-owned companies that have DOE...

  9. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  10. July 2012, Work Force Retention Work Group Status Overview

    Office of Environmental Management (EM)

    Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group

  11. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vermont Contractors With Help When They Need It NeighborWorks of Western Vermont ... organization to fulfill our contractors' need for a temporary workforce for home ...

  12. Work For Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-28

    Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1A.

  13. Work For Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-03

    Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. WFO has the following objectives. Cancels DOE O 481.1.

  14. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  15. Working with SRNL - Technology Partnerships

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13/2015 SEARCH SRNL GO SRNL Home Technology Partnerships Working with SRNL Technology Partnerships Work for Others and Cooperative Research and Development Agreements SRNL is pleased to provide a variety of business arrangements whereby our technologies or capabilities can be utilized to benefit the general public. We welcome opportunities to bring new technologies to the marketplace by closely working with industry, universities, or state and local government agencies. With its wide spectrum of

  16. High Temperature Membrane Working Group

    Broader source: Energy.gov [DOE]

    The High Temperature Membrane Working Group consists of government, industry, and university researchers interested in developing high temperature membranes for fuel cells.

  17. INL @ work: Nuclear Reactor Operator

    ScienceCinema (OSTI)

    Russell, Patty

    2013-05-28

    INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

  18. Radiation Safety Work Control Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form : Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers...

  19. Working with SRNL - Technology Transfer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SRNL GO Tech Briefs Contacts Ombudsman Tech Home SRNL Home Working with SRNL Technology Transfer 2015 SRNL Research and Technology Recognition Reception Click to view the 2015...

  20. This report was prepared as an account of work sponsored by an agency of the Uni

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or rtsponsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific

  1. Method of measurement of VOCs in the off-gas and wastewater of wastewater treatment plants

    SciTech Connect (OSTI)

    Min Wang; Keener, T.C.; Orton, T.L.; Zhu, H.; Bishop, P.; Pekonen, S.; Siddiqui, K.

    1997-12-31

    VOCs need to be controlled according to Title 3 of the 1990 Clean Air Act Amendments (CAAA), so an accurate estimation of the total VOC emissions must be attained. This paper reports on a study where EPA method 624 was revised so that this method could be used for VOC analysis both in the water and off-gas of wastewater treatment plants. The revised method uses the same approach and equipment as water and soil analyses, thereby providing a great time and cost advantage for anyone needing to perform this type of analysis. Without using a cryogenic preconcentration step, gas samples from Tedlar bags are easily analyzed to concentrations of approximately 20 ppb using scan mode in a GC-MS unit. For the wastewater, scan mode was still used for the identification, but Selected Ion Monitoring (SIM) mode was used for quantitative analysis because of lower VOC concentration in the water. The results show that this method`s detection limit (MDL) was lowered 2--3 orders of magnitude when compared with scan mode. The modified method has been successfully applied to the identification and quantitative analysis of wastewater and off-gas VOCs from a publicly owned treatment works (POTW) aeration basin (120 MGD).

  2. Who owns the recyclables

    SciTech Connect (OSTI)

    Parker, B.

    1994-05-01

    On March 31, the California Supreme Court decided the much awaited Rancho Mirage'' case (Waste Management of the Desert, Inc., and the City of Rancho Mirage v. Palm Springs Recycling Center, Inc.), and held that the California Integrated Waste Management Act of 1989 does not allow an exclusive franchise for the collection of recyclables not discarded by their owner.'' This ends a three-year slugfest between secondary materials processors in the state and municipalities and their franchised garbage haulers who also collect and process recyclables as part of their exclusive arrangement. Central to this nationally-watched litigation is a most fundamental question in waste management: at what point in time do articles in the solid waste stream become actual or potentially valuable secondary materials

  3. Innovative Mercury Treatment Benefits Stream, Fish

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – A team of scientists is working at the Savannah River Site (SRS) to evaluate the impact of an innovative, inexpensive treatment system that removes mercury from water.

  4. Interagency Sustainability Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities Sustainable Buildings & Campuses Interagency Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group ...

  5. Decommissioning and Dismantling of Liquid Waste Storage and Liquid Waste Treatment Facility from Paldiski Nuclear Site, Estonia

    SciTech Connect (OSTI)

    Varvas, M.; Putnik, H.; Johnsson, B.

    2006-07-01

    The Paldiski Nuclear Facility in Estonia, with two nuclear reactors was owned by the Soviet Navy and was used for training the navy personnel to operate submarine nuclear reactors. After collapse of Soviet Union the Facility was shut down and handed over to the Estonian government in 1995. In co-operation with the Paldiski International Expert Reference Group (PIERG) decommission strategy was worked out and started to implement. Conditioning of solid and liquid operational waste and dismantling of contaminated installations and buildings were among the key issues of the Strategy. Most of the liquid waste volume, remained at the Facility, was processed in the frames of an Estonian-Finnish co-operation project using a mobile wastewater purification unit NURES (IVO International OY) and water was discharged prior to the site take-over. In 1999-2002 ca 120 m{sup 3} of semi-liquid tank sediments (a mixture of ion exchange resins, sand filters, evaporator and flocculation slurry), remained after treatment of liquid waste were solidified in steel containers and stored into interim storage. The project was carried out under the Swedish - Estonian co-operation program on radiation protection and nuclear safety. Contaminated installations in buildings, used for treatment and storage of liquid waste (Liquid Waste Treatment Facility and Liquid Waste Storage) were then dismantled and the buildings demolished in 2001-2004. (authors)

  6. WageWorks Screen Shot(s)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WageWorks Screen Shot(s)

  7. Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11.

  8. September 2012, Work Force Retention Work Group Status Overview

    Energy Savers [EERE]

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce

  9. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  10. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  11. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  12. Utility Security & Resiliency: Working Together

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses Edison Electric Institute (EEI), including its key security objectives, key activities, cybersecurity activities, and spare transformer equipment program (STEP).

  13. Attachment 1 - Performance Work Statement

    National Nuclear Security Administration (NNSA)

    including TTR. Waste acceptance services will be performed at the NNSS and at waste generator sites. DE-SOL-0005982 Attachment 1 Page 1 2. Scope of Work 2.1 Requirement: The EPS...

  14. DOE Work Breakdown Structure Handbook

    Broader source: Energy.gov [DOE]

    This handbook provides suggested guidance and best practices on the development of product-oriented Work Breakdown Structures (WBS) that should be used by all projects within DOE to organize and...

  15. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can...

  16. Underground Coal Thermal Treatment

    SciTech Connect (OSTI)

    Smith, P.; Deo, M.; Eddings, E.; Sarofim, A.; Gueishen, K.; Hradisky, M.; Kelly, K.; Mandalaparty, P.; Zhang, H.

    2012-01-11

    The long-term objective of this work is to develop a transformational energy production technology by insitu thermal treatment of a coal seam for the production of substitute natural gas (SNG) while leaving much of the coal's carbon in the ground. This process converts coal to a high-efficiency, low-GHG emitting gas fuel. It holds the potential of providing environmentally acceptable access to previously unusable coal resources. This topical report discusses the development of experimental capabilities, the collection of available data, and the development of simulation tools to obtain process thermo-chemical and geo-thermal parameters in preparation for the eventual demonstration in a coal seam. It also includes experimental and modeling studies of CO2 sequestration.

  17. Submitting Work | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Submitting Work Customers may directly contact the supervisor of the required service area to discuss the technical details of proposed projects. Iowa State University requestors need to bring an Intramural Purchase Order (IPO) with them from their departmental office to request services. After the technical details of the project are known, a cost estimate is prepared. Ames Laboratory operations work less than $1,000 is submitted directly to the shop using the Engineering Services Shop -

  18. AEO2016 Electricity Working Group

    Gasoline and Diesel Fuel Update (EIA)

    Office of Electricity, Coal, Nuclear, and Renewables Analysis December 8, 2015 | Washington, DC AEO2016 Electricity Working Group WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE What to look for: Electricity sector in AEO2016 * Inclusion of EPA final Clean Power Plan in Reference Case * Updated cost estimates for new generating technologies * Major data update on existing coal plant status: MATS- compliant technology or retirement

  19. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | NRC Officials Visit WIPP Tod A weekly e-newsletter for the Waste Isolation Pilot Plant team September 25, 2003 The Big Story Recertification - a work in progress Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-25-03 at 7:16 a.m.) 21 Shipments

  20. Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11, cancels DOE O 481.1C. Admin Chg 2, dated 3-9-15, cancels DOE O 481.1C Admin Chg 1

  1. Greenhouse gas emissions from landfill leachate treatment plants: A comparison of young and aged landfill

    SciTech Connect (OSTI)

    Wang, Xiaojun; Jia, Mingsheng; Chen, Xiaohai; Xu, Ying; Lin, Xiangyu; Kao, Chih Ming; Chen, Shaohua

    2014-07-15

    Highlights: • Young and aged leachate works accounted for 89.1% and 10.9% of 33.35 Gg CO{sub 2} yr{sup −1}. • Fresh leachate owned extremely low ORP and high organic matter content. • Strong CH{sub 4} emissions occurred in the fresh leachate ponds, but small in the aged. • N{sub 2}O emissions became dominant in the treatment units of both systems. • 8.45–11.9% of nitrogen was removed as the form of N{sub 2}O under steady-state. - Abstract: With limited assessment, leachate treatment of a specified landfill is considered to be a significant source of greenhouse gas (GHG) emissions. In our study, the cumulative GHG emitted from the storage ponds and process configurations that manage fresh or aged landfill leachate were investigated. Our results showed that strong CH{sub 4} emissions were observed from the fresh leachate storage pond, with the fluxes values (2219–26,489 mg C m{sup −2} h{sup −1}) extremely higher than those of N{sub 2}O (0.028–0.41 mg N m{sup −2} h{sup −1}). In contrast, the emission values for both CH{sub 4} and N{sub 2}O were low for the aged leachate tank. N{sub 2}O emissions became dominant once the leachate entered the treatment plants of both systems, accounting for 8–12% of the removal of N-species gases. Per capita, the N{sub 2}O emission based on both leachate treatment systems was estimated to be 7.99 g N{sub 2}O–N capita{sup −1} yr{sup −1}. An increase of 80% in N{sub 2}O emissions was observed when the bioreactor pH decreased by approximately 1 pH unit. The vast majority of carbon was removed in the form of CO{sub 2}, with a small portion as CH{sub 4} (<0.3%) during both treatment processes. The cumulative GHG emissions for fresh leachate storage ponds, fresh leachate treatment system and aged leachate treatment system were 19.10, 10.62 and 3.63 Gg CO{sub 2} eq yr{sup −1}, respectively, for a total that could be transformed to 9.09 kg CO{sub 2} eq capita{sup −1} yr{sup −1}.

  2. Coiled tubing working life prediction

    SciTech Connect (OSTI)

    Wu, J.

    1995-12-31

    Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coiled tubing operations. This paper discusses the coiled tubing working life based on one of the coiled tubing life models published in the literature, and compares the results with other models. Certain agreements are found among these models. A group of curves is presented to illustrate the coiled tubing working life affected by coiled tubing size and wall thickness, internal pressure, yield strength, reel diameter, gooseneck radius, operation condition (corrosion) and butt-welded connection (stress concentration). The results show that coiled tubing life can be greatly increased by increasing CT wall thickness and CT strength, while the coiled tubing working life decreases under high internal pressure, corrosion, and butt-weld conditions. These curves can be easily used in estimating coiled tubing life for the field use.

  3. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1997-12-31

    This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

  4. Long working distance interference microscope

    DOE Patents [OSTI]

    Sinclair, Michael B.; DeBoer, Maarten P.; Smith, Norman F.

    2004-04-13

    Disclosed is a long working distance interference microscope suitable for three-dimensional imaging and metrology of MEMS devices and test structures on a standard microelectronics probe station. The long working distance of 10-30 mm allows standard probes or probe cards to be used. This enables nanometer-scale 3-D height profiles of MEMS test structures to be acquired across an entire wafer. A well-matched pair of reference/sample objectives is not required, significantly reducing the cost of this microscope, as compared to a Linnik microinterferometer.

  5. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  6. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  7. Evaluation of Codisposal Viability for TH/U Carbide (Fort Saint Vrain HTGR) DOE-Owned Fuel

    SciTech Connect (OSTI)

    H. radulescu

    2001-09-28

    There are more than 250 forms of US Department of Energy (DOE)-owned spent nuclear fuel (SNF). Due to the variety of the spent nuclear fuel, the National Spent Nuclear Fuel Program has designated nine representative fuel groups for disposal criticality analyses based on fuel matrix, primary fissile isotope, and enrichment. The Fort Saint Vrain reactor (FSVR) SNF has been designated as the representative fuel for the Th/U carbide fuel group. The FSVR SNF consists of small particles (spheres of the order of 0.5-mm diameter) of thorium carbide or thorium and high-enriched uranium carbide mixture, coated with multiple, thin layers of pyrolytic carbon and silicon carbide, which serve as miniature pressure vessels to contain fission products and the U/Th carbide matrix. The coated particles are bound in a carbonized matrix, which forms fuel rods or ''compacts'' that are loaded into large hexagonal graphite prisms. The graphite prisms (or blocks) are the physical forms that are handled in reactor loading and unloading operations, and which will be loaded into the DOE standardized SNF canisters. The results of the analyses performed will be used to develop waste acceptance criteria. The items that are important to criticality control are identified based on the analysis needs and result sensitivities. Prior to acceptance to fuel from the Th/U carbide fuel group for disposal, the important items for the fuel types that are being considered for disposal under the Th/U carbide fuel group must be demonstrated to satisfy the conditions determined in this report.

  8. Federal Utility Partnership Working Group

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among Federal agencies, utilities, and energy service companies. The group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites.

  9. ACME solar works | Open Energy Information

    Open Energy Info (EERE)

    ACME solar works Jump to: navigation, search Logo: ACME solar works Name: ACME solar works Address: 20738 Brown Lane Place: Summerdale, Alabama Zip: 36580 Sector: Solar Product:...

  10. Working Gas in Underground Storage Figure

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Working Gas in Underground Storage Figure Working Gas in Underground Storage Figure Working Gas in Underground Storage Compared with 5-Year Range Graph....

  11. LotusWorks | Open Energy Information

    Open Energy Info (EERE)

    LotusWorks Jump to: navigation, search Name: LotusWorks Place: Ireland Product: Engineering, technical and construction management service provider. References: LotusWorks1 This...

  12. Federal Utility Partnership Working Group Meeting: Washington...

    Energy Savers [EERE]

    Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting:...

  13. Sandia Energy - UFD Working Group 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UFD Working Group 2015 Home Stationary Power Nuclear Fuel Cycle Nuclear Energy Workshops UFD Working Group 2015 UFD Working Group 2015lmays2015-07-06T17:21:43+00:00 UFD WORKING...

  14. Working with SRNL - Technology Partnerships

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19/2015 SEARCH SRNL GO SRNL Home SRNL Contacts Media Contacts For information about the Savannah River National Laboratory, contact: Will Callicott, Manager SRNL Executive Communications will.callicott@srnl.doe.gov 803-725-3786 Lana Patterson, Communications Coordinator SRNL Executive Communications lana.patterson@srnl.doe.gov 803-725-4396 Technology Transfer For information on working with SRNL in the development and use of new technology, contact: Dale Haas, Manager (Acting) Partnerships and

  15. Production work up for grabs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    work up for grabs Los Alamos continued in turmoil and scientists kept leaving. The Operation Crossroads effort had dealt the laboratory a tremendous blow as the demands for production seemed to override any scientific research and development. On September 24, 1946, John H. Manley wrote General Groves a letter as noted in Hewlett and Anderson's The New World. The letter said, in part, that Los Alamos was unable to maintain the position the United States had advertised before the world regarding

  16. Renewable Electricity Working Group Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development efforts for AEO 2014 and future AEOs - Model updates - Policy updates - Planned additions updates - Performance updates * Obtain feedback from stakeholders on any key items that EIA should look at Chris Namovicz, July 9 2 Status of AEO 2013 Chris Namovicz, July 9 * AEO 2013 was released in stages this year - Reference

  17. http://bellview/TeamWorks/TRUTeamWorks.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thursday, 9/4/03 | Total shipments received at WIPP: 1,978 | Shipments expected this week: Hanford (2), LA A weekly e-newsletter for the Waste Isolation Pilot Plant team September 4, 2003 The Big Story Get ready, set, go for 100 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e

  18. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15/04 Shipments expected this week: Hanford (2), NTS (2), RFETS (11), SRS (6) January 15, 2004 The Big Story Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/15/04 at 7:09 a.m. Shipments scheduled to arrive at WIPP this week 21 Total shipments

  19. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/04 Shipments expected this week: Hanford (3), NTS (2), RFETS (11), SRS (6) January 22, 2004 The Big Story Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/22/04 at 7:22 a.m. Shipments scheduled to arrive at WIPP this week 22 Total shipments

  20. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9/04 Shipments expected this week: NTS (2), RFETS (13), SRS (6) January 29, 2004 The Big Story WTS restructures workforce Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/29/04 at 7:14 a.m.) Shipments scheduled to arrive at WIPP this week 21 Total

  1. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A weekly e-newsletter for the Waste Isolation Pilot Plant team September 18, 2003 The Big Story Characterization Operations completed at ANL-E Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-18-03 at 7:17 a.m.) 21 Shipments scheduled to arrive

  2. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 2, 2003 The Big Story Laboratory setup at CEMRC is teamwork in action Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP

  3. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16/03 | Shipments expected this week: ANL-E (2) , RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 16, 2003 The Big Story EM-6 to review WIPP baseline Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of

  4. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3/03 | Shipments expected this week: RFETS (11), SRS (4), Hanford (2) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 23, 2003 Sealed sources: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/23/03

  5. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13/03 | Shipments expected this week: RFETS (11), SRS (6) | WIPP welcomes new CBFO Deputy Ma A weekly e-newsletter for the Waste Isolation Pilot Plant team November 13, 2003 The Big Story Farewell to a leader Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP

  6. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20/03 | Shipments expected this week: Hanford (2), RFETS (14), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team November 20, 2003 The Big Story WIPP welcomes Lloyd Piper Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of

  7. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04/03 | Shipments expected this week: Hanford (2), RFETS (11), SRS (3) | December 4, 2003 The Big Story H.R.2754 to usher in change Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 12/4/03 at 8:05 a.m.) Shipments scheduled to arrive at WIPP this

  8. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/03 | Shipments expected this week: Hanford (2), RFETS (11), SRS (3) | December 11, 2003 The Big Story Standardization - a cost saving innovation Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 12/11/03 at 7:47 a.m.) Shipments scheduled to arrive

  9. Federal Utility Partnership Working Group Seminar: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility Partnership Working Group Seminar:...

  10. Workforce Retention Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Retention Work Group Workforce Retention Work Group The Workforce Retention Work Group was established to collaboratively address the needs of the Department to maintain a skilled work force in the face of anticipated retirements and to address the specific health and safety concerns of that work force that could impede retention. Due to the broad nature of the issues reflected within this working group, the chartered objectives and outcomes have been moved forward to be worked by the

  11. Federal Utility Partnership Working Group Spring 2007 Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Nevada. This project: * Provides renewable utility service from a contractor-owned photovoltaic array to the Nellis AFB electrical distribution system. * Utilizes a UESC. *...

  12. Exascale Hardware Architectures Working Group

    SciTech Connect (OSTI)

    Hemmert, S; Ang, J; Chiang, P; Carnes, B; Doerfler, D; Leininger, M; Dosanjh, S; Fields, P; Koch, K; Laros, J; Noe, J; Quinn, T; Torrellas, J; Vetter, J; Wampler, C; White, A

    2011-03-15

    The ASC Exascale Hardware Architecture working group is challenged to provide input on the following areas impacting the future use and usability of potential exascale computer systems: processor, memory, and interconnect architectures, as well as the power and resilience of these systems. Going forward, there are many challenging issues that will need to be addressed. First, power constraints in processor technologies will lead to steady increases in parallelism within a socket. Additionally, all cores may not be fully independent nor fully general purpose. Second, there is a clear trend toward less balanced machines, in terms of compute capability compared to memory and interconnect performance. In order to mitigate the memory issues, memory technologies will introduce 3D stacking, eventually moving on-socket and likely on-die, providing greatly increased bandwidth but unfortunately also likely providing smaller memory capacity per core. Off-socket memory, possibly in the form of non-volatile memory, will create a complex memory hierarchy. Third, communication energy will dominate the energy required to compute, such that interconnect power and bandwidth will have a significant impact. All of the above changes are driven by the need for greatly increased energy efficiency, as current technology will prove unsuitable for exascale, due to unsustainable power requirements of such a system. These changes will have the most significant impact on programming models and algorithms, but they will be felt across all layers of the machine. There is clear need to engage all ASC working groups in planning for how to deal with technological changes of this magnitude. The primary function of the Hardware Architecture Working Group is to facilitate codesign with hardware vendors to ensure future exascale platforms are capable of efficiently supporting the ASC applications, which in turn need to meet the mission needs of the NNSA Stockpile Stewardship Program. This issue is relatively immediate, as there is only a small window of opportunity to influence hardware design for 2018 machines. Given the short timeline a firm co-design methodology with vendors is of prime importance.

  13. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    PDF icon Work Plan - U.S.-India Coal Working Group More Documents & Publications Work Group Telecom (Draft Charters) U.S.-India Coal Working Group Terms of Reference Work Group Leadership Meetings: Transition Elements

  14. How Do I Get Authorization to Work with Lasers at the ALS?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Authorization to Work with Lasers at the ALS? Print Authorization for laser use depends on whether users will be bringing their own system to the ALS, whether they intend to use an existing setup, and which class of laser they intend to use. If You Are Bringing a Laser For lasers of Class 3a/3R or less, there are no specific restrictions for use, but the This e-mail address is being protected from spambots. You need JavaScript enabled to view it needs to be notified and to see the equipment

  15. How Do I Get Authorization to Work with Lasers at the ALS?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Authorization to Work with Lasers at the ALS? Print Authorization for laser use depends on whether users will be bringing their own system to the ALS, whether they intend to use an existing setup, and which class of laser they intend to use. If You Are Bringing a Laser For lasers of Class 3a/3R or less, there are no specific restrictions for use, but the This e-mail address is being protected from spambots. You need JavaScript enabled to view it needs to be notified and to see the equipment

  16. How Do I Get Authorization to Work with Lasers at the ALS?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Authorization to Work with Lasers at the ALS? Print Authorization for laser use depends on whether users will be bringing their own system to the ALS, whether they intend to use an existing setup, and which class of laser they intend to use. If You Are Bringing a Laser For lasers of Class 3a/3R or less, there are no specific restrictions for use, but the This e-mail address is being protected from spambots. You need JavaScript enabled to view it needs to be notified and to see the equipment

  17. How Do I Get Authorization to Work with Lasers at the ALS?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Authorization to Work with Lasers at the ALS? Print Authorization for laser use depends on whether users will be bringing their own system to the ALS, whether they intend to use an existing setup, and which class of laser they intend to use. If You Are Bringing a Laser For lasers of Class 3a/3R or less, there are no specific restrictions for use, but the This e-mail address is being protected from spambots. You need JavaScript enabled to view it needs to be notified and to see the equipment

  18. How Do I Get Authorization to Work with Lasers at the ALS?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Authorization to Work with Lasers at the ALS? Print Authorization for laser use depends on whether users will be bringing their own system to the ALS, whether they intend to use an existing setup, and which class of laser they intend to use. If You Are Bringing a Laser For lasers of Class 3a/3R or less, there are no specific restrictions for use, but the This e-mail address is being protected from spambots. You need JavaScript enabled to view it needs to be notified and to see the equipment

  19. Indian Country Energy and Infrastructure Working Group Meeting Summary - May 15, 2014

    Office of Environmental Management (EM)

    May 15, 2014 U.S. Grant Hotel San Diego, California MEETING OVERVIEW The thirteenth meeting of the Indian Country Energy and Infrastructure Working Group (ICEIWG), established by the U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs (IE), took place on Thursday, May 15, 2014 in San Diego, California. The meeting was co-hosted by ICEIWG Member, the Ewiiaapaayp Band of Kumeyaay Indians at the U.S. Grant Hotel, owned by the Sycuan Band of Kumeyaay Indians. ACTION ITEMS 1.

  20. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  1. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  2. SpringWorks | Open Energy Information

    Open Energy Info (EERE)

    SpringWorks Jump to: navigation, search Name: SpringWorks Place: Minnetonka, Minnesota Zip: 55343-8684 Product: SpringWorks was created to discover and nurture incubation companies...

  3. Working with Modules within Perl and Python

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Modules within Perl and Python Working with Modules within Perl and Python It can often be convenient to work with the modules system from within perl or python...

  4. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2015 Work Plan-Facilitator notes on midyear status for TWC-lead topics (10/22/15) Page 1 of 3 Topic Committee Assignment Potential FY 2015 Action/Product Context 6-Month Status (IM, Committee, Advice, Deferred, No Action) 6. Safety Culture Improvement Efforts TWC Informational Improvement actions in response to the June 2014 follow-up Assessment of Safety Culture - focusing on Office of River Protection (ORP) and the Waste Treatment and Immobilization Plant (WTP). Report anticipated

  5. Computer modeling reveals how surprisingly potent hepatitis C drug works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hepatitis C computer modeling Computer modeling reveals how surprisingly potent hepatitis C drug works A study reveals how daclatasvir targets one of its proteins and causes the fastest viral decline ever seen with anti-HCV drugs - within 12 hours of treatment. February 19, 2013 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

  6. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  7. Peak Underground Working Natural Gas Storage Capacity

    Gasoline and Diesel Fuel Update (EIA)

    of capacity that may understate the amount that can actually be stored. Working Gas Design Capacity: This measure estimates a natural gas facility's working gas capacity, as...

  8. California Working Natural Gas Underground Storage Capacity ...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

  9. Brad Foote Gear Works | Open Energy Information

    Open Energy Info (EERE)

    Brad Foote Gear Works Jump to: navigation, search Name: Brad Foote Gear Works Place: Cicero, Illinois Zip: 60804-1404 Sector: Wind energy Product: Gearing systems manufacturer...

  10. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  11. Washington Working Natural Gas Underground Storage Capacity ...

    Gasoline and Diesel Fuel Update (EIA)

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Washington Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

  12. Mississippi Working Natural Gas Underground Storage Capacity...

    Gasoline and Diesel Fuel Update (EIA)

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Mississippi Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

  13. Pennsylvania Working Natural Gas Underground Storage Capacity...

    Gasoline and Diesel Fuel Update (EIA)

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Pennsylvania Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May...

  14. Contact Us - Working With Us | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Us - Working With Us Contact us to learn more about working with NREL. Your name (Required) Your email address (Required) Your telephone number Your organization Your role...

  15. Federal Utility Partnership Working Group Meeting Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Chairman's Corner Federal Utility Partnership Working Group Meeting Chairman's Corner Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG)...

  16. Federal Utility Partnership Working Group Meeting: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting: Chairman's Corner Federal Utility Partnership Working Group Meeting: Chairman's Corner Presentation-given at the April 2012 Federal Utility Partnership Working Group...

  17. Work & Life at Munich | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work & Life at Munich Work & Life at Munich Living at Germany's Cosmopolitan Crossroads offers easy access to outdoor pursuits in the Alps and travel throughout Europe. Click to...

  18. Current work in energy analysis

    SciTech Connect (OSTI)

    1998-03-01

    This report describes the work performed at Berkeley Lab most recently. One of the Labs accomplishments is the publication of Scenarios of US Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the US. This analysis is described and played a key role in shaping the US position on climate change in the Kyoto Protocol negotiations. The Labs participation in the fundamental characterization of the climate change issue by the IPCC is described. Described also is a study of leaking electricity, which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of US residential electricity currently expended on standby losses. The 54 vignettes contained in the report summarize results of research activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national Energy Star{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China.

  19. Hadron Colliders Working Group Report

    SciTech Connect (OSTI)

    S. Peggs and M.J. Syphers

    2001-11-08

    The ''point design'' studied this year shows that a staged VLHC (40, {approx} 200 TeV) is feasible, with no insurmountable challenges. Further work can provide a more optimized design, by studying various alternative field strengths (e.g., superferric magnets for Stage 1) for improvements to vacuum, wall impedance, and other major performance parameters. It may be that a ''single-stage'' scenario for accessing higher energies sooner is the correct approach. A next-step design study should be considered to look at the two cases near to and complementary to the 2001 VLHC Design Study. The effectiveness of photon stops and their engineering design need to be addressed in the near future to truly determine if these devices can lead this effort to even higher luminosities and energies. The superbunch approach should continue to be studied, as well as IR designs, new instrumentation and diagnostics, and beam dynamics issues. Finally, a well organized VLHC-motivated beam studies effort should become part of the national program.

  20. Working Gas in Underground Storage Figure

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Gas in Underground Storage Figure Working Gas in Underground Storage Compared with 5-Year Range Graph...

  1. PIA - Radiological Work Permit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Work Permit PIA - Radiological Work Permit PIA - Radiological Work Permit PDF icon PIA - Radiological Work Permit More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System

  2. Interagency Working Groups | Department of Energy

    Office of Environmental Management (EM)

    About the Federal Energy Management Program » Interagency Working Groups Interagency Working Groups The Federal Energy Management Program works closely with agencies and partner organizations to coordinate interagency working groups. These groups focus on federal energy management and compliance with federal laws and requirements. Interagency Energy Management Task Force The Interagency Energy Management Task Force coordinates federal government activities that encourage energy conservation and

  3. Quality Work Plan Inspection and Monitoring Requirement

    Broader source: Energy.gov [DOE]

    Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

  4. ILDG Middleware Working Group Status Report

    SciTech Connect (OSTI)

    B. Joo; W. Watson

    2004-09-01

    We report on the status of the ILDG Middleware Working Group. The Middleware Working Group was formed with the aim of designing standard middleware to allow the interoperation of the data grids of ILDG member collaborations. Details of the working group are given. In this contribution we outline the role of middleware in the ILDG, present our proposed middleware architecture and discuss our current status and future work within the working group.

  5. How Fuel Cells Work | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cells Work How Energy Works 30 likes How Fuel Cells Work Fuel cells produce electrical power without any combustion and operate on fuels like hydrogen, natural gas and propane. This clean energy technology can provide power for virtually any application -- from cars and buses to commercial buildings -- while helping reduce carbon pollution and oil consumption. As part of How Energy Works, we'll cover everything from how fuel cells work and why to their important to current uses and the

  6. Training Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outreach Forums » Focus Group and Work Group Activities » Training Work Group Training Work Group Collaborative Training Work Group: In a teamed effort, the U.S. Department of Energy's (DOE) National Training Center (NTC), the National Institute of Environmental Health Sciences (NIEHS), Volpentest HAMMER Training and Education Center (HAMMER), Energy Facility Contractors Group (EFCOG), and labor unions work to identify and address worker health, safety and security training improvement needs

  7. Clinton Engineer Works map | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clinton Engineer Works map Clinton Engineer Works map

  8. Electrochemical removal of material from metallic work

    DOE Patents [OSTI]

    Csakvary, Tibor; Fromson, Robert E.

    1980-05-13

    Deburring, polishing, surface forming and the like are carried out by electrochemical machining with conformable electrode means including an electrically conducting and an insulating web. The surface of the work to be processed is covered by a deformable electrically insulating web or cloth which is perforated and conforms with the work. The web is covered by a deformable perforated electrically conducting screen electrode which also conforms with, and is insulated from, the work by the insulating web. An electrolyte is conducted through the electrode and insulating web and along the work through a perforated elastic member which engages the electrode under pressure pressing the electrode and web against the work. High current under low voltage is conducted betwen the electrode and work through the insulator, removing material from the work. Under the pressure of the elastic member, the electrode and insulator continue to conform with the work and the spacing between the electrode and work is maintained constant.

  9. Waste Treatment Facility Saves Taxpayers Nearly $20 Million | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Waste Treatment Facility Saves Taxpayers Nearly $20 Million Waste Treatment Facility Saves Taxpayers Nearly $20 Million December 11, 2012 - 1:40pm Addthis A new enclosure for processing radioactive casks has put Oak Ridge on a path to finishing cleanup work two years ahead of schedule, saving nearly $20 million. | Photo courtesy of the Office of Environmental Management. A new enclosure for processing radioactive casks has put Oak Ridge on a path to finishing cleanup work two years

  10. How Carbon Capture Works | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Fusion Energy Works 33 likes Fusion energy is the energy source of the sun and all of the stars. As part of How Energy Works, we'll cover everything from fuel sources to plasma...

  11. Elmira Stove Works: Order (2011-CE-1407)

    Broader source: Energy.gov [DOE]

    DOE ordered Elmira Stove Works to pay a $6,000 civil penalty after finding Elmira Stove Works had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standard.

  12. How Radar Works | Open Energy Information

    Open Energy Info (EERE)

    Radar Works Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: How Radar Works Author Institute For Geophysics Published Institute For Geophysics, 2013...

  13. How Solar Works | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Fusion Energy Works 33 likes Fusion energy is the energy source of the sun and all of the stars. As part of How Energy Works, we'll cover everything from fuel sources to plasma...

  14. SolarWorks NJ | Open Energy Information

    Open Energy Info (EERE)

    Energy, Solar Product: SolarWorks NJ, LLC, a provider of turnkey solar electricity installations and renewable energy solutions. References: SolarWorks NJ1 This article is a...

  15. Work-Life Balance | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to my work, and when I go home, I'm able to have a life outside work. I used to play soccer, so I'm looking to join a women's soccer team in the Chicago suburbs." - Emily...

  16. Work Authorization System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Work Authorization System More Documents & Publications Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change EERE Program Management Guide - Chapter 6 Cost-Shared Development of Innovative Small Modular Reactor Designs

  17. Working with the Real Estate Sector

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Workforce Peer Exchange Call: Working with the Real Estate Sector, Call Slides and Discussion Summary, March 1, 2012. This call discussed effective strategies for working with the real estate sector.

  18. Fiscal Year 2015 Annual Work Plan Update

    Broader source: Energy.gov [DOE]

    At the February 18, 2015 Committee meeting Overview and Synopsis of the Work Planned for FY'15 at LANL

  19. NREL: Buildings Research - Working With Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working With Us NREL's award-winning work with the commercial and public sectors to improve building energy performance is central to its mission. Learn about our awards. At NREL, industry, universities, and government agencies have many opportunities to take advantage of our residential and commercial buildings expertise. Here's how you can work with us to improve the energy efficiency of your buildings. Partner with Us You can work with our experts and use NREL's outstanding facilities and

  20. Nevada Working Group (JOWOG 32 HDT)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNevada Working Group Meeting (JOWOG 32 HDT) Radiographs Nevada Working Group Meeting (JOWOG 32 HDT) 11-13 April 2016, Los Alamos National Laboratory The Nevada Working group meeting (NVWG) brings together the teams working jointly in subcritical experiments at the Nevada test site. NVWG meeting will be starting on Monday morning through lunchtime Wednesday, 11-13 April 2016 at Los Alamos National Laboratory and it is hosted under the auspices of JOWOG 32 HDT. This workshop will be

  1. Hydrogen Pipeline Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline Working Group Hydrogen Pipeline Working Group The Hydrogen Pipeline Working Group of research and industry experts focuses on issues related to the cost, safety, and reliability of hydrogen pipelines. Participants represent organizations conducting hydrogen pipeline research for the Department of Energy to better understand and minimize hydrogen embrittlement and to identify improved and new materials for hydrogen pipelines. Hydrogen Pipeline Working Group Workshops: September 25-26,

  2. Agenda: High Temperature Membrane Working Group Meeting

    Broader source: Energy.gov [DOE]

    Agenda for the High Temperature Membrane Working Group (HTMWG) meeting on May 18, 2009, in Arlington, Virginia

  3. NEMS Buildings Sector Working Group Meeting

    Gasoline and Diesel Fuel Update (EIA)

    NEMS Buildings Sector Working Group Meeting Erin Boedecker Owen Comstock Behjat Hojjati Kevin Jarzomski David Peterson Steve Wade October 4, 2012 | Washington, D.C. AEO2013 Preliminary Results WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview Buildings Working Group Forrestal 2E-069 | October 4, 2012 2 * Recap of project list

  4. @ work' video segment features Robotic Software Engineer

    ScienceCinema (OSTI)

    Idaho National Laboratory

    2010-01-08

    @ work highlights Idaho National Laboratory employees and the jobs they perform.This segment features Robotic Software Engineer Miles Walton.

  5. How to Work With the Media Webinar

    Broader source: Energy.gov [DOE]

    How to Work With the Media Webinar, from the U.S. Department of Energy's Better Buildings Neighborhood Program.

  6. Training Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Charter Training Work Group Charter The Training Work Group fosters improvements in the quality, efficacy, and delivery of DOE safety training, and realizes significant efficiencies by minimizing redundancies across the DOE Complex. The Work Group provides a collaborative opportunity for DOE to gain insights from operating contractors, the contractor work force and their representatives, and to combine the best wisdom to assure that the most efficient and effective worker health and safety

  7. TEC Working Group Member Organizations Representatives | Department...

    Office of Environmental Management (EM)

    Member Organizations Representatives TEC Working Group Member Organizations Representatives PDF icon TEC MEMBER ORGANIZATION REPRESENTATIVES TOPIC GROUP PARTICIPATION February 2006...

  8. Work for Others | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work for Others Work for Others The Department of Energy (DOE) national laboratories are available to conduct work for other Federal agencies and non-Federal customers on a 100% reimbursable basis. This work uses laboratory personnel and/or facilities; pertains to the mission of the laboratory; does not conflict or interfere with the achievement of DOE program objectives; does not place the laboratory in direct competition with the domestic private sector; and does not create a potential future

  9. Working with CMI: Associates | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Associates CMI Associates work with CMI researchers to define a scope of work, budget and timeline for the work. Once internally approved, the entity must execute either a CRADA or SPP with Ames or another Team national laboratory before work may begin. For more information, contact Stacy Joiner: joiner@ameslab.gov, 515-294-5932 CMIaffiliates@ameslab.gov CMI Membership Program, The Ames Laboratory, 311 TASF, Ames, IA, 50011-3020

  10. NREL: Distributed Grid Integration - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us Two men and two women in safety glasses stand near outdoor electric power equipment. Collaborate with NREL's world-class distributed grid integration research staff at the Energy Systems Integration Facility. NREL's electric infrastructure systems research involves industry, academia, other national laboratories, and various standards organizations through collaborative work and the use of our facilities. Collaborative Work To engage in collaborative work for NREL's distributed

  11. NREL: Transmission Grid Integration - Working With Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working With Us NREL works with industry, government, and academia on transmission integration research. Learn how you can work with us. Develop Technology Partnerships There are a variety of ways to get involved with NREL's transmission integration activities. You can: Work collaboratively with NREL through cooperative research and development agreements. This is the most common means of industrial collaboration. Participate in subcontracted research. Close to half NREL's budget supports

  12. Solar Industry at Work | Laila Mattos

    ScienceCinema (OSTI)

    Mattos, Laila

    2013-05-29

    Laila Mattos, a technology manager at Alta Devices, talks about what it means to work for a "disruptive" solar company.

  13. HQ Work Control Permit | Department of Energy

    Office of Environmental Management (EM)

    HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any

  14. Strategic Initiatives Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Initiatives Work Group Strategic Initiatives Work Group The Work Group, comprised of members representing DOE, contractor and worker representatives, provides a forum for information sharing; data collection and analysis; as well as, identifying best practices and initiatives to enhance safety performance and safety culture across the Complex. Due to the broad nature of the issues reflected within this working group, the chartered objectives and outcomes have been moved forward to be

  15. Nano Design Works | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nano Design Works Nano Design Works (NDW) capitalizes on the power of nanotechnology and provides services to strengthen its impact. With expertise in nanomaterials, computing, chemistry, materials, and energy systems, along with its world-class facilities, Argonne is a perfect match for companies looking to make a big impact with tiny materials. PDF icon Argonne_Nano_Design_Works

  16. Working With Municipal Utilities | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Residential Network Program Sustainability / Working with Utilities Peer Exchange Call: Working with Smaller Municipal Utilities, Call Slides and Summary, June 27, 2013. PDF icon Call Slides and Summary More Documents & Publications Better Buildings Working with Utilities Peer Exchange Call: Kick-off Transitioning to a Utility Funded Program Environment: What Do I Need to Know? Tracking and Using Data to Support Revenue Streams

  17. Work Plans & Manuals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

  18. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    SciTech Connect (OSTI)

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

  19. Thermal treatment wall

    DOE Patents [OSTI]

    Aines, Roger D. (Livermore, CA); Newmark, Robin L. (Livermore, CA); Knauss, Kevin G. (Livermore, CA)

    2000-01-01

    A thermal treatment wall emplaced to perform in-situ destruction of contaminants in groundwater. Thermal destruction of specific contaminants occurs by hydrous pyrolysis/oxidation at temperatures achievable by existing thermal remediation techniques (electrical heating or steam injection) in the presence of oxygen or soil mineral oxidants, such as MnO.sub.2. The thermal treatment wall can be installed in a variety of configurations depending on the specific objectives, and can be used for groundwater cleanup, wherein in-situ destruction of contaminants is carried out rather than extracting contaminated fluids to the surface, where they are to be cleaned. In addition, the thermal treatment wall can be used for both plume interdiction and near-wellhead in-situ groundwater treatment. Thus, this technique can be utilized for a variety of groundwater contamination problems.

  20. Medical Actinium Therapeutic Treatment

    ScienceCinema (OSTI)

    None

    2013-05-28

    Learn how INL researchers are increasing world supplies of Bismuth 213 to help with cancer treatments. For more information about INL research projects, visit http://www.facebook.com/idahonationallaboratory.

  1. Portable treatment systems study

    SciTech Connect (OSTI)

    Sherick, M.J.; Schwinkendorf, W.E.; Bechtold, T.E.; Cole, L.T.

    1997-03-01

    In developing their Site Treatment Plans (STPs), many of the Department of Energy installations identified some form of portable treatment, to facilitate compliant disposition of select mixed low-level wastestreams. The Environmental Management Office of Science and Technology requested that a systems study be performed to better define the potential role of portable treatment with respect to mixed low-level waste, highlight obstacles to implementation, and identify opportunities for future research and development emphasis. The study was performed by first establishing a representative set of mixed waste, then formulating portable treatment system concepts to meet the required processing needs for these wastes. The portable systems that were conceptualized were evaluated and compared to a fixed centralized treatment alternative. The system evaluations include a life-cycle cost analysis and an assessment of regulatory, institutional, and technical issues associated with the potential use of portable systems. The results of this study show that when all costs are included, there are no significant cost differences between portable systems and fixed systems. However, it is also emphasized that many uncertainties exist that could impact the cost of implementing portable treatment systems. Portable treatment could be made more attractive through private sector implementation, although there is little economic incentive for a commercial vendor to develop small, specialized treatment capabilities with limited applicability. Alternatively, there may also be valid reasons why fixed units cannot be used for some problematic wastestreams. In any event, there are some site-specific problems that still need to be addressed, and there may be some opportunity for research and development to make a positive impact in these areas.

  2. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary - Work Force Retention

    Energy Savers [EERE]

    Work Force Retention Work Group Co-Lead Telecom November 16, 2012 DRAFT Discussion Overview Purpose: This HSS Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized leadership and oversight by

  3. Buildings*","Nongovernment-Owned Buildings",,,,"Government-Owned...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "District Chilled Water ......",2853,1069,711,323,"Q",1785,247,1051,487 "Water-Heating Energy Sources" "(more than one may apply)" "Electricity ......",27490,221...

  4. Buildings*","Nongovernment-Owned Buildings",,,,"Government-Owned...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...4,"N","Q","Q","Q","Q" "District Chilled Water ......",33,13,9,4,"Q",19,0,12,7 "Water-Heating Energy Sources" "(more than one may apply)" "Electricity ......",1910,1657...

  5. NREL: Energy Systems Integration - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us Working with outside organizations is the key to moving clean energy technologies into the market, so NREL offers industry, universities, and government agencies opportunities to leverage its research expertise. Read more about our current partners. Partner With NREL Photo of two men working with power equipment in a laboratory. At the Energy Systems Integration Facility, NREL partners with industry and academia to scale up promising clean energy technologies and test how they

  6. NREL: Transportation Research - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us Partnerships Drive Transportation Solutions Photo of two men standing in front of a large solar panel and an electric vehicle. NREL offers industry, academia, and other government agencies opportunities to work with us and leverage our research expertise. There are several ways for your organization to get involved with us: Partner with NREL through a Cooperative Research and Development Agreement or a Work-for-Others Agreement. License NREL-developed technologies. The Energy

  7. NREL: Wind Research - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us NREL works with industry in a public-private contracting environment to research, design, and build advanced wind energy technologies. We have an outstanding performance record for working with the wind industry to advance wind turbine science and lower the cost of wind-generated electricity. Companies partner with NREL when they have particular design challenges, when they wish to cost-share development of state-of-the-art wind turbines, and when they want to document their

  8. Catalysis Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalysis Working Group Catalysis Working Group The Catalysis Working Group (CWG) meets twice per year to exchange information, create synergies, and collaboratively develop both an understanding of and tools for studying electrocatalysis for polymer electrolyte fuel cells (PEFCs) and other low- and intermediate-temperature fuel cell systems, including direct methanol fuel cells (DMFCs), alkaline fuel cells (AFCs), alkaline membrane fuel cells (AMFCs), and phosphoric acid fuel cells (PAFCs). The

  9. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11/10/15 following the PIC November meeting (Blue titles indicate those topics specifically identified in the FY 2016 HAB Work Plan; Italicized items indicate tentative) December January February Committee Call Placeholder 12/16 Committee Call Placeholder 1/20 Committee Meeting Placeholder 2/2 Debrief TPA Agency Public Involvement Events o What worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC meeting topics WTP Communications Strategy o

  10. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  11. Working with Our Communities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with Our Communities Working with Our Communities Working with Our Communities Asset Revitalization promotes a more efficient business environment through integration of DOE missions with community interests. ARI encourages collaborative efforts of public, private, and community sector resources. Through ARI, DOE supports efforts to economically diversify the economies of those communities most impacted by DOE site activities, including DOE mission consolidation and/or cleanup and

  12. Macro-Industrial Working Group: meeting 1

    Gasoline and Diesel Fuel Update (EIA)

    July 24, 2012 Macroeconomic team: Kay Smith, Russ Tarver, Elizabeth Sendich and Vipin Arora WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Joint Macro-Industrial Working Group: Annual Energy Outlook 2013 Macroeconomic Modeling Plans Presentation Goals 2 July 24 2012 Joint Macroeconomics and Industrial Working Group * Highlight proposed macroeconomic AEO2013 modeling changes * Description of Proposed Reference Case - Highlight short-term

  13. Transuranic Waste Transportation Working Group Agenda

    Office of Environmental Management (EM)

    States Energy Board Joint Meeting of the Radioactive Materials Transportation Committee and the Transuranic Waste Transportation Working Group The Hilton Knoxville Knoxville, Tennessee May 15, 2012 Tuesday, May 15, 2012 8:30 a.m. Breakfast 9:30 a.m. Welcome / Opening Remarks / Introductions - Christopher Wells, Southern States Energy Board - Sandra Threatt, Chair, SSEB Radioactive Materials Transportation Working Group - Elgan Usrey, Chair, SSEB Transuranic Waste Transportation Working Group

  14. How Carbon Capture Works | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carbon Capture Works How Energy Works 34 likes How Carbon Capture Works Nearly 70 percent of America's electricity is generated from fossil fuels like coal, oil and natural gas. And fossil fuels also account for almost three-fourths of human-caused emissions in the past two decades. Carbon capture, utilization and storage (CCUS) -- also referred to as carbon capture, utilization and sequestration -- is a process that captures carbon dioxide emissions from sources like coal-fired power plants and

  15. How Fuel Cells Work | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    0 likes How Fuel Cells Work Fuel cells produce electrical power without any combustion and operate on fuels like hydrogen, natural gas and propane. This clean energy technology can provide power for virtually any application -- from cars and buses to commercial buildings -- while helping reduce carbon pollution and oil consumption. As part of How Energy Works, we'll cover everything from how fuel cells work and why to their important to current uses and the future of the technology. Learn more

  16. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an

  17. Quality Procedure - Stop Work | Department of Energy

    Energy Savers [EERE]

    Stop Work Quality Procedure - Stop Work This Quality Procedure establishes the Office of Standards and Quality Assurance authority, responsibilities, and instructions to direct that unsafe work be stopped, during the execution and operations of its activities, specifically in oversight activities. this procedure is utilized and accomplished upon coordination with management of the Environmental Management (EM) Headquarters and Field Office. This procedure also provides provisions for the restart

  18. Quality Work Plan Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Requirements Quality Work Plan Requirements The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance,

  19. How it Works | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How it Works How it Works How Does Hydroelectricity Work? Types of Hydropower Facilities Impoundment Hydropower: Uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant reservoir level. Diversion Hydropower: Channels a portion of the river through a canal or a penstock but may require a dam. Pumped Storage: Pumps water from a lower reservoir to an upper reservoir at times when demand for electricity is low. During periods of high

  20. Working At DOE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    At DOE Working At DOE Working At DOE Only Here...Will you Define the Future of Energy The people of DOE are engaged in a wide range of challenging and innovative work - from participating in groundbreaking international initiatives like the Global Nuclear Partnership, to solar power demonstration projects, to projects that convert captured carbon dioxide (CO2) emissions from industrial sources into fuel, plastics, and fertilizers. Only here can the diversity of activities throughout our

  1. Anadarko Public Works Auth | Open Energy Information

    Open Energy Info (EERE)

    File for 2010 - File1a" Retrieved from "http:en.openei.orgwindex.php?titleAnadarkoPublicWorksAuth&oldid880476" Feedback Contact needs updating Image needs updating...

  2. DOE Contractor Work Force Restructuring Approval Thresholds

    Energy Savers [EERE]

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can make decision bit must notify DOE of intent of restructuring 101-200 employees DOENNSA...

  3. Work and Life Balance | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Balancing Work with Life Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Flex Ability: Balancing Work with Life Achieving work/life balance is a much-talked-about topic. According to GE Healthcare's Kelly Piacsek, "GE hires people for what's inside their head-what they know-and the specific hours you spend at work

  4. Working With Weatherization Assistance Programs | Department...

    Energy Savers [EERE]

    Assistance Programs Working With Weatherization Assistance Programs Better Buildings Low Income Peer Exchange Call Featuring: Case study on integration of income-qualified...

  5. Safety at Work | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In case of emergency If you need help or assistance dial 911 (from Argonne phones) or (630) 252-1911 (from cell phones) Safety at Work As a staff member or user at the Center for Nanoscale Materials (CNM), you need to be aware of safety regulations at Argonne National Laboratory. You are also required to have taken any safety, orientation, and training classes or courses specified by your User Work Approval(s) and/or work planning and control documents prior to beginning your work. For safety

  6. How Solar Works | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Carbon Capture Works 34 likes Carbon capture, utilization and storage is a process that captures carbon dioxide emissions from sources like coal-fired power plants and either...

  7. How Carbon Capture Works | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    How Carbon Capture Works Nearly 70 percent of America's electricity is generated from fossil fuels like coal, oil and natural gas. And fossil fuels also account for almost...

  8. Philadelphia Gas Works - Commercial and Industrial Equipment...

    Broader source: Energy.gov (indexed) [DOE]

    Administrator Philadelphia Gas Works Website http:www.pgwenergysense.comdownloads.html State Pennsylvania Program Type Rebate Program Rebate Amount Commercial Boilers: 800 -...

  9. Spotlight on Seattle, Washington: Community Partnerships Work...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Making the Program Work for Contractors Better Buildings - Spotlight on Portland, Oregon; Financing and Incetntives: Use Incentives to Get Attention and Encourage Deep Savings

  10. Sandia National Laboratories: Working with Sandia: Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Sandia Procurement Construction Potential Suppliers Becoming a Supplier to Sandia What Does Sandia Buy? Small Business JCEL photo Current Suppliers Accounts Payable...

  11. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/18/15 (Blue titles indicate those topics specifically identified in the 2015 HAB Work Plan; Italicized items indicate tentative) February March April Committee Call 2/18 Committee Call Placeholder 3/18 Committee Mtg Placeholder 4/7 (1 p.m. - 5 p.m.) Committee Business o Update 3-month committee work plan o Round-robin of HAB member outreach Debrief TPA Agency Public Involvement Events o What worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC

  12. Federal Utility Partnership Working Group Seminars

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) meets twice per year to share success stories, information on Federal Energy Management Program activities and other business.

  13. Working with SRNL - Technology Transfer - Ombudsman

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GO Tech Briefs Contacts Ombudsman Tech Home SRNL Home Working with SRNL - Technology Transfer Ombudsman SRS Entry Sign The Department of Energy and its management and operating...

  14. Federal Utility Partnership Working Group Purpose, Policies,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purpose, Policies, and Operations Federal Utility Partnership Working Group Purpose, Policies, and Operations Draft document (last updated in 2010) discusses the purpose, policies,...

  15. Project Profile: Chemically Reactive Working Fluids | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    opportunity announcement (FOA), is working to identify and test new heat-transfer fluids (HTFs) that store energy chemically for more efficient energy transfer in CSP applications. ...

  16. Olmsted County Public Works | Open Energy Information

    Open Energy Info (EERE)

    Facebook: https:www.facebook.compagesOlmsted-County-Public-Works1536287513256862?refprofile Outage Hotline: 507-328-7070 References: EIA Form EIA-861 Final Data File for...

  17. Lancaster Live/Work Townhome Prototype

    SciTech Connect (OSTI)

    2010-04-01

    This case study describes development of a prototype live-work townhome that is highly efficient at 45% energy savings (95% counting photovoltaic system).

  18. Peak Underground Working Natural Gas Storage Capacity

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Capacity Peak Underground Working Natural Gas Storage Capacity Released: September 3, 2010 for data as of April 2010 Next Release: August 2011 References Methodology Definitions...

  19. UNIRIB: How to Work with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How to Work With Us The University Radioactive Ion Beam (UNIRIB) Consortium offers opportunities for participants to perform basic research on rare, short-lived atomic nuclei....

  20. Mobile machine hazardous working zone warning system

    DOE Patents [OSTI]

    Schiffbauer, William H. (Connellsville, PA); Ganoe, Carl W. (Pittsburgh, PA)

    1999-01-01

    A warning system is provided for a mobile working machine to alert an individual of a potentially dangerous condition in the event the individual strays into a hazardous working zone of the machine. The warning system includes a transmitter mounted on the machine and operable to generate a uniform magnetic field projecting beyond an outer periphery of the machine in defining a hazardous working zone around the machine during operation thereof. A receiver, carried by the individual and activated by the magnetic field, provides an alarm signal to alert the individual when he enters the hazardous working zone of the machine.

  1. Working at CNM | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Policies Safety at Work EMC User Safety Scheduled Maintenance Periods Transportation For Industrial Users Acknowledgment Statements for Publications End of Experiment...

  2. Mobile machine hazardous working zone warning system

    DOE Patents [OSTI]

    Schiffbauer, W.H.; Ganoe, C.W.

    1999-08-17

    A warning system is provided for a mobile working machine to alert an individual of a potentially dangerous condition in the event the individual strays into a hazardous working zone of the machine. The warning system includes a transmitter mounted on the machine and operable to generate a uniform magnetic field projecting beyond an outer periphery of the machine in defining a hazardous working zone around the machine during operation. A receiver, carried by the individual and activated by the magnetic field, provides an alarm signal to alert the individual when he enters the hazardous working zone of the machine. 3 figs.

  3. ASRAC MREF Working Group Notice of Intent

    Broader source: Energy.gov (indexed) [DOE]

    rulemaking process, and instead explore openly with other parties all ideas that may emerge from the working group's discussions. E. Facilitator The facilitator will act as a...

  4. Community Power Works Better Buildings Conference

    Broader source: Energy.gov [DOE]

    Presents the elements of Seattle's high-road agreement, new approaches to training, and the Community Power Works training process and modules.

  5. Weekly Working Gas in Underground Storage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    company data. Notes: This table tracks U.S. natural gas inventories held in underground storage facilities. The weekly stocks generally are the volumes of working gas as...

  6. Working at NNSA | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Blog NNSA & Nuclear Security Enterprise support nation's preparedness NNSA Blog NNSA's work aids in fight against cancer NNSA Blog NSC leader recognized as community role model...

  7. Elements of doing work at SSRL (rev

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    work authorization processes given in http:www- ssrl.slac.stanford.edusafetyindex.html. 5. Ensure procedures are up to date before use. Resources: 1. SSRL safety...

  8. Hanford Advisory Board 2013 Program of Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    advice, discussion , public involvement One System: Ray Sworich, Rick Kasick, Ben Harp, Chris Harrington Draft *** Draft *** Draft Hanford Advisory Board 2013 Program of Work...

  9. Peak Underground Working Natural Gas Storage Capacity

    Gasoline and Diesel Fuel Update (EIA)

    Previous Articles Previous Articles Estimates of Peak Underground Working Gas Storage Capacity in the United States, 2009 Update (Released, 8312009) Estimates of Peak Underground...

  10. Community Power Works Final Report and Conclusions

    SciTech Connect (OSTI)

    Baumel, Christie

    2015-03-09

    This is the final technical report for the City of Seattle's Community Power Works program, funded through the US DOE Better Buildings grant program.

  11. Working and Net Available Shell Storage Capacity

    U.S. Energy Information Administration (EIA) Indexed Site

    Working and Net Available Shell Storage Capacity With Data for September 2015 | Release ... Containing storage capacity data for crude oil, petroleum products, and selected biofuels. ...

  12. Oregon Iron Works Inc | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Oregon Iron Works Inc Region: United States Sector: Marine and Hydrokinetic Website: http: This company is listed in the Marine and Hydrokinetic...

  13. Federal Utility Partnership Working Group - Utility Interconnection...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group (FUPWG) meeting-discusses solarphotovoltaic (PV) projects to connect with utility in California and their issues. fupwgfall12jewell.pd...

  14. DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) |

    Office of Environmental Management (EM)

    Department of Energy O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) Work-for-Others (WFO) Agreements permit DOE laboratories and facilities to conduct work for other federal agencies and non-federal entities (including state and local governments, universities) on a reimbursable basis. Intellectual property rights generally belong to the user. The work must pertain to the mission of the laboratory or

  15. Section C: Description, Specifications and Work Statements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C DESCRIPTION/SPECIFICATION/ STATEMENT OF WORK Request for Proposal #DE-RP36-07GO97036 PART I SECTION C DESCRIPTION/SPECIFICATION/ STATEMENT OF WORK TABLE OF CONTENTS C.1 Introduction ............................................................................................................1 C.2 Purpose ...................................................................................................................2 C.3

  16. Working with NIST | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with NIST Working with NIST Presentation prepared by Terry Lynch for the 2005 Manufacturing R&D for the hydrogen economy roadmap workshop. PDF icon mfg_wkshp_lynch.pdf More Documents & Publications Federal Technology Transfer and the Federal Laboratory Consortium: Doing Business with the National Labs TTWG Reporting and Appraisal Guide

  17. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary - Training Work Group

    Energy Savers [EERE]

    Training Work Group Co-Lead Telecom November 16, 2012 DRAFT Discussion Overview Purpose: This HSS Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized leadership and oversight by representatives

  18. Low work function, stable thin films

    DOE Patents [OSTI]

    Dinh, Long N. (Concord, CA); McLean, II, William (Oakland, CA); Balooch, Mehdi (Berkeley, CA); Fehring, Jr., Edward J. (Dublin, CA); Schildbach, Marcus A. (Livermore, CA)

    2000-01-01

    Generation of low work function, stable compound thin films by laser ablation. Compound thin films with low work function can be synthesized by simultaneously laser ablating silicon, for example, and thermal evaporating an alkali metal into an oxygen environment. For example, the compound thin film may be composed of Si/Cs/O. The work functions of the thin films can be varied by changing the silicon/alkali metal/oxygen ratio. Low work functions of the compound thin films deposited on silicon substrates were confirmed by ultraviolet photoelectron spectroscopy (UPS). The compound thin films are stable up to 500.degree. C. as measured by x-ray photoelectron spectroscopy (XPS). Tests have established that for certain chemical compositions and annealing temperatures of the compound thin films, negative electron affinity (NEA) was detected. The low work function, stable compound thin films can be utilized in solar cells, field emission flat panel displays, electron guns, and cold cathode electron guns.

  19. Internal temperature monitor for work pieces

    DOE Patents [OSTI]

    Berthold, John W. (Salem, OH)

    1993-01-01

    A method and apparatus for measuring the internal temperature of a work piece comprises an excitation laser for generating laser pulses which are directed through a water cooled probe, and in an optical fiber, to a first surface of the work piece. The laser is of sufficient intensity to ablate the surface of the work piece, producing a displacement and a resulting ultrasonic pulse which propagates within the thickness of the work piece to an opposite surface. The ultrasonic pulse is reflected from the opposite surface and returns to the first surface to create a second displacement. A second continuous laser also shines its light through an optical fiber in the probe into the first surface and is used in conjunction with signal processing equipment to measure the time between the first and second displacements. This time is proportional to the time-of-flight of the ultrasonic pulse in the work piece which, with a known or detected thickness of the work piece, can be used to calculate the internal temperature of the work piece.

  20. Internal temperature monitor for work pieces

    DOE Patents [OSTI]

    Berthold, J.W.

    1993-07-13

    A method and apparatus for measuring the internal temperature of a work piece comprises an excitation laser for generating laser pulses which are directed through a water cooled probe, and in an optical fiber, to a first surface of the work piece. The laser is of sufficient intensity to ablate the surface of the work piece, producing a displacement and a resulting ultrasonic pulse which propagates within the thickness of the work piece to an opposite surface. The ultrasonic pulse is reflected from the opposite surface and returns to the first surface to create a second displacement. A second continuous laser also shines its light through an optical fiber in the probe into the first surface and is used in conjunction with signal processing equipment to measure the time between the first and second displacements. This time is proportional to the time-of-flight of the ultrasonic pulse in the work piece which, with a known or detected thickness of the work piece, can be used to calculate the internal temperature of the work piece.

  1. Working with Modules within Perl and Python

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Modules within Perl and Python Working with Modules within Perl and Python It can often be convenient to work with the modules system from within perl or python scripts. You can do this! Using Modules within Python The EnvironmentModules python package gives access to the module system from within python. The EnvironmentModules python package has a single function: module. Using this function you can provide the same arguments you would to "module" on the command line. The

  2. How Do I Work with Chemicals?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Do I Work with Chemicals? Print Planning In your experiment proposal, you must indicate whether you will be working with chemicals at the ALS. In the Experiment Safety Sheet (ESS), identify each chemical that you will be working with and let ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it know if any are flammable, toxic, engineered nanomaterials or reactive items. LBNL has an on-line MSDS database that can provide information for most

  3. How Do I Work with Chemicals?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Do I Work with Chemicals? Print Planning In your experiment proposal, you must indicate whether you will be working with chemicals at the ALS. In the Experiment Safety Sheet (ESS), identify each chemical that you will be working with and let ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it know if any are flammable, toxic, engineered nanomaterials or reactive items. LBNL has an on-line MSDS database that can provide information for most

  4. How Do I Work with Chemicals?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Do I Work with Chemicals? Print Planning In your experiment proposal, you must indicate whether you will be working with chemicals at the ALS. In the Experiment Safety Sheet (ESS), identify each chemical that you will be working with and let ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it know if any are flammable, toxic, engineered nanomaterials or reactive items. LBNL has an on-line MSDS database that can provide information for most

  5. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-0987 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's

  6. How Fusion Energy Works | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fusion Energy Works How Energy Works 33 likes How Fusion Energy Works Fusion energy is the energy source of the sun and all of the stars. In fusion, two light atomic nuclei are fused together to create energy (as opposed to fission where the nucleus of an atom is split apart). The scientific basis underlying fusion energy is known as plasma physics. Plasma is one of the one of the four fundamental states of matter and makes up 99 percent of the visible universe. On a basic level, a plasma is a

  7. How Solar Works | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Works How Energy Works 32 likes How Solar Works Every four minutes, another American home or business goes solar, but how do solar panels turn sunlight into energy? We'll answer that question, while exploring other topics like the different types of solar technology available for both commercial and residential use and the steps you need to take before you install solar panels on your house. For more on solar energy, check out the Top 6 Things You Didn't Know About Solar Energy. Innovators

  8. Elements of doing work at SSRL (rev

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outline for doing work at SSRL Goals: 1. Work effectively, efficiently and safely 2. Compliance with DOE Directives as stated in on ES&H ISEMS web site: http://www-group.slac.stanford.edu/esh/general/isems/ 3. Compliance with SLAC operating directives as found on the SSRL safety web page http://www-ssrl.slac.stanford.edu/safety/index.html, e.g., AHAs, JHAMs, Work Authorizations, and Guidelines for Operations. Methods: 1. Safety process: practice 5 core functions; follow JHAMs, safety

  9. How Do I Work with Chemicals?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Do I Work with Chemicals? Print Planning In your experiment proposal, you must indicate whether you will be working with chemicals at the ALS. In the Experiment Safety Sheet (ESS), identify each chemical that you will be working with and let ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it know if any are flammable, toxic, engineered nanomaterials or reactive items. LBNL has an on-line MSDS database that can provide information for most

  10. How Do I Work with Chemicals?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Do I Work with Chemicals? Print Planning In your experiment proposal, you must indicate whether you will be working with chemicals at the ALS. In the Experiment Safety Sheet (ESS), identify each chemical that you will be working with and let ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it know if any are flammable, toxic, engineered nanomaterials or reactive items. LBNL has an on-line MSDS database that can provide information for most

  11. Kids at Work | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "Young Scientists" Join Mom and Dad at Work Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) GE's "Young Scientists" Join Mom and Dad at Work In 2013, GE Global Research employees brought more than 300 of their children, ranging in age from 8 to 16 years, to work for a day. The kids met Baxter (a

  12. Work Plan FY 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plan FY 2016 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 A list of audits and inspections planned for FY 2016 by the U.S. Department of Energy, Office of Inspector General, Office of Audits and Inspections PDF icon Work Plan FY 2016 More Documents & Publications Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Planned Audits and Inspections FY 2013 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs

  13. Working at EERE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employment Opportunities » Working at EERE Working at EERE As a model employer and diversity/inclusion leader, we treat people as our greatest asset at the Office of Energy Efficiency and Renewable Energy (EERE). Our goal is to be an employer of choice and a diversity leader, and we measure our success by the engagement of our employees, the satisfaction of our customers and our relationships with the communities in which we work. In EERE, we constantly strive for a workplace that is inclusive

  14. Control of work function of graphene by plasma assisted nitrogen doping

    SciTech Connect (OSTI)

    Akada, Keishi; Terasawa, Tomo-o; Imamura, Gaku; Obata, Seiji; Saiki, Koichiro, E-mail: saiki@k.u-tokyo.ac.jp [Department of Complexity Science and Engineering, The University of Tokyo, Kashiwanoha 5-1-5, Kashiwa, Chiba 277-8561 (Japan)

    2014-03-31

    Nitrogen doping is expected to provide several intriguing properties to graphene. Nitrogen plasma treatment to defect-free and defective highly oriented pyrolytic graphite (HOPG) samples causes doping of nitrogen atom into the graphene layer. Nitrogen atoms are initially doped at a graphitic site (inside the graphene) for the defect-free HOPG, while doping to a pyridinic or a pyrrolic site (edge of the graphene) is dominant for the defective HOPG. The work function of graphene correlates strongly with the site and amount of doped nitrogen. Nitrogen atoms doped at a graphitic site lower the work function, while nitrogen atoms at a pyridinic or a pyrrolic site increase the work function. Control of plasma treatment time and the amount of initial defect could change the work function of graphite from 4.3?eV to 5.4?eV, which would open a way to tailor the nature of graphene for various industrial applications.

  15. September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group Charter

    Energy Savers [EERE]

    TEMPLATE Office of Health, Safety and Security Focus Group [Name of Work Group] Work Group Charter (Date) I. PURPOSE The HSS Focus Group [Name of Work Group] is one of several HSS Work Groups, established to address worker health, safety and security programs improvements across the U.S. Department of Energy Complex. The [Name of Work Group] has been established to (state specific purpose). II. OBJECTIVES (State the desired impact(s) and major outcome(s) for, the Work Group) 1. Establish

  16. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help

    Energy Savers [EERE]

    When They Need It | Department of Energy Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It LaborWorks@NeighborWorks is a nonprofit temporary labor pool formed to assist professional contractors involved with the HEAT Squad during busy periods when they couldn't keep up with demand or hire full-time help. This interview provides background information about

  17. The Backstage Work of Data Sharing

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kervin, Karina E.; Cook, Robert B; Michener, William K.

    2014-01-01

    Conventional wisdom suggests that there are benefits to the creation of shared repositories of scientific data. Funding agencies require that the data from sponsored projects be shared publicly, but individual researchers often see little personal benefit to offset the work of creating easily sharable data. These conflicting forces have led to the emergence of a new role: data managers. This paper identifies key differences between the socio-technical context of data managers and other human infrastructure roles articulated previously in Computer Supported Cooperative Work (CSCW) literature and summarizes the challenges that data managers face when accepting data for archival and reuse.more » While data managers work is critical for advancing science and science policy, their work is often invisible and under-appreciated since it takes place behind the scenes.« less

  18. Work & Life at Niskayuna | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work & Life at Niskayuna Living in New York's Tech Valley provides easy access to arts, culture and the great outdoors. Click to email this to a friend (Opens in new window)...

  19. How Carbon Capture Works | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Solar Works 32 likes Every four minutes, another American home or business goes solar, but how do solar panels turn sunlight into energy? We'll answer that question and more Learn...

  20. Reimbursable Work for Department of Homeland Security

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-02-28

    To authorize a modified process for the acceptance, performance, and administration of work from the Department of Homeland Security (DHS) by Department of Energy (DOE) contractor and federally operated laboratories, sites, and other facilities.

  1. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in point. The complex chemistry associated with the iron-based catalyst has made even the identity of the active catalyst at work an unsolved mystery. At the ALS, de Smit et al....

  2. Students gain work experience at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Students Gain Work Experience at WIPP CARLSBAD, N.M., January 10, 2000 -- Students from two Eddy County high schools are gaining valuable experience by spending time with employees...

  3. Financial Policy and Procedures for Reimbursable Work

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-08-15

    The directive establishes Department-wide financial policy and procedural guidance applicable to performing reimbursable work for other Federal agencies and with non-Federal Government entities, including foreign and commercial entities, State, and political subdivisions.

  4. INL@Work Hope Lee microbiologist

    SciTech Connect (OSTI)

    Lee, Hope

    2010-01-01

    INL environmental microbiologist Hope Lee is working to develop and apply tools that clean contaminants out of ground water. You can learn more about INL's environmental projects at http://www.facebook.com/idahonationallaboratory.

  5. NREL: Photovoltaics Research - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    you want to do. Partner with Us A wide angle photo from the ceiling of a laboratory. A man is adjusting something on a circular machine. You can work with our experts and take...

  6. INL@Work Hope Lee microbiologist

    ScienceCinema (OSTI)

    Lee, Hope

    2013-05-28

    INL environmental microbiologist Hope Lee is working to develop and apply tools that clean contaminants out of ground water. You can learn more about INL's environmental projects at http://www.facebook.com/idahonationallaboratory.

  7. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    moving forward with advice) Tour (K Basins? N Area?) Update on PFP Briefing on PUREX tunnels (currently not on HAB 2014 Work Plan; will need to go through EIC process to add to...

  8. How Fuel Cells Work | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    panels turn sunlight into energy? We'll answer that question and more Learn More How Fusion Energy Works 33 likes Fusion energy is the energy source of the sun and all of the...

  9. How Solar Works | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    cover everything you need to know about this clean energy technology. Learn More How Fusion Energy Works 33 likes Fusion energy is the energy source of the sun and all of the...

  10. How Fuel Cells Work | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    can learn how this technology can help us lower our carbon pollution. Learn More How Fusion Energy Works 33 likes Fusion energy is the energy source of the sun and all of the...

  11. Work Control Process, 3/9/95

    Broader source: Energy.gov [DOE]

    The objective of this surveillance guide is to provide lines of inquiry for evaluating the effectiveness of the contractor's work control process. Users should be cognizant that the lines of...

  12. Field Work Proposal (FWP) | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Field Work Proposal (FWP) Version Number: 5.0 Document Number: Form 58100.007 Effective Date: 01/2016 File (public): Microsoft Office document icon form_58100.007_rev5.doc

  13. Return to Work - HPMC Occupational Health Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    days. In some cases, additional testing or evaluation may be needed to assess fitness for duty. We utilize the workers' EJTA to determine if they may safely return to work and...

  14. RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP

    Broader source: Energy.gov [DOE]

    The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

  15. W Boson Mass Working Group Report

    SciTech Connect (OSTI)

    Kilgore, W.; Kilgore, W.

    2010-06-14

    The W boson mass working group discussed the current status of the W boson mass measurement and the prospects for improving on LEP and Tevatron measurements at the LHC.

  16. Energy Cost Control: How the Money Works

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Christopher Russell Energy PathFINDER www.energypathfinder.com crussell@energypathfinder.com Energy Cost Control: How the Money Works (Copies of these slides to be provided by ...

  17. EnerWorks Inc | Open Energy Information

    Open Energy Info (EERE)

    Inc Place: Ontario, Canada Zip: NOL 1GO Sector: Solar Product: Ontario-based solar water heating system manufacturer and installer. References: EnerWorks Inc1 This article...

  18. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.J. Kooyman, H.W. Zandbergen, C. Morin, B.M. Weckhuysen, and F.M.F. de Groot, "Nanoscale chemical imaging of a working catalyst by scanning transmission X-ray microscopy," Nature...

  19. Federal Utility Partnership Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    leadership to the country. Dr. Unruh feels that UESCs are hidden gems and have a lot more value than given credit for. FEMP is working on ways provide institutions with a better...

  20. Safety Monitor Joint Working Group (JWG) Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 th Meeting of the Joint Working Group of the U.S.-Japan Coordinating Committee of Fusion Energy on Safety in Inter-Institutional Collaborations (U.S.-Japan Safety Monitoring...

  1. The Early Antiproton Work [Nobel Lecture

    DOE R&D Accomplishments [OSTI]

    Chamberlain, O.

    1959-12-15

    Early work on the antiproton, particularly that part which led to the first paper on the subject, is described. Conclusions that can be drawn purely from the existence of the antiproton are discussed. (W.D.M.)

  2. Microsoft Word - Project Mgt Working Group Report

    Office of Environmental Management (EM)

    Improving Project Management Report of the Contract and Project Management Working Group November 2014 1 TABLE OF CONTENTS 1. Foreword ........................................................................................................................................................................... 2 2. Executive Summary ...................................................................................................................................................... 3 2.1 Summary of

  3. NREL: Biomass Research - Working With Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us NREL offers industry, universities, and other government agencies opportunities to leverage NREL's research expertise. Working with outside organizations is the key to moving advanced biomass conversion technology and processes for the production of bio-based products-i.e., biofuels and biochemicals-into the market. Explore NREL's biomass projects for examples of stakeholder partnerships. We provide opportunities to develop technology partnerships, license our technologies, and

  4. Water as a thermoacoustic working fluid

    SciTech Connect (OSTI)

    Swift, G.W.

    1988-01-01

    This short report, addressed only to the thermoacoustic cognoscenti, discusses thermodynamic and transport properties of water with emphasis on water's virtues as a thermoacoustic working fluid. Short-stack-approximation calculations are presented, showing that water is a good working fluid. A very rough design for a sound source using water is also presented as a starting point for discussing the merits and difficulties of this technology. 4 figs.

  5. Working with SRNL - Our Facilities - Main Campus

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SRNL Home SRNL main campus Working with SRNL Our Facilities - Main Campus SRNL personnel put science to work in a variety of unique and traditional spaces. These include both clean and radiological laboratory facilities, as well as facilities for testing and prototype development. SRNL's Main Laboratory is a Hazard Category II Nuclear Facility, equipped to safely manage appreciable quantities of radioactive materials in containment hood, glovebox, and shielded cell processing applications. *

  6. Macro-Industrial Working Group 2

    Gasoline and Diesel Fuel Update (EIA)

    2 Macro-Industrial Working Group Macroeconomic Analysis Team: Kay Smith, Team Leader, Elizabeth Sendich, Russ Tarver, and Vipin Aurora September 11, 2012 | Washington, DC Macro section WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview Macroeconomic Team, Washington, DC, Sept. 11, 2012 2 * The overall macroeconomic outlook * The detailed industrial production outlook * Summary employment and commercial floor space outlook *

  7. Macro-Industrial Working Group: meeting 1

    Gasoline and Diesel Fuel Update (EIA)

    4 Macro/Industrial Working Group Macroeconomic team: Kay Smith, Russ Tarver, Elizabeth Sendich and Vipin Arora Briefing on Macroeconomic Reference Case for the Annual Energy Outlook 2015 Macro's FY2015 AEO initiatives met 2 Kay Smith, AEO2015 Macroeconomic/Industrial Working Group July 24, 2014 PLEASE DO NOT CITE OR DISTRIBUTE * Review incorporation of completed AEO macroeconomic initiatives. - Incorporation of 2009 based GDP - Use of 2007 supply matrix and its extension to 2012 - The extension

  8. Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    Transportation External Coordination Working Group (TEC) July 17-19, 2001 Cincinnati, Ohio Meeting Summary The Transportation External Coordination Working Group (TEC) held its 19 th semi-annual meeting July 17-19, 2001, in Cincinnati, Ohio. One hundred fifteen people attended (see Appendix A for listing of participants). Jim Carlson, U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and TEC co-chair, welcomed participants to the meeting. He then introduced

  9. Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    Portland, Oregon - February 6-7, 2001 Transportation External Coordination Working Group (TEC) February 6-7, 2001 Portland, Oregon Meeting Summary The Transportation External Coordination Working Group (TEC) held its 18 th semi-annual meeting February 6-7, 2001, in Portland, Oregon. Attending were 125 representatives from national, State, Tribal and local government organizations, industry and professional groups and other interested parties/DOE programs who meet to address a variety of issues

  10. WM Committee FY'16 Work Plan

    Office of Environmental Management (EM)

    Committee FY'16 Work Plan Approved at the March 9, 2016 Combined Committee Meeting 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) WASTE MANAGEMENT COMMITTEE 2016 Work Plan SECTION I. MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board (NNMCAB) Waste Management (WM) Committee reviews policies, practices and procedures, existing and proposed to provide recommendations, advice, suggestions and opinions to the US Department of Energy (DOE), regarding the waste management

  11. DOE Contractor Work Force Restructuring Approval Thresholds

    Energy Savers [EERE]

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can make decision bit must notify DOE of intent of restructuring 101-200 employees DOE/NNSA field office is authorized to provide approval 201-500 employees LM is authorized to provide approval and NNSA Administrator is authorized to provide approval for NNSA work force restructurings in consultation with LM 501 and above employees Under Secretary/NNSA Administrator approval required

  12. WIPP TRU TeamWorks - About Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us TRU TeamWorks is an e-newsletter published for the Waste Isolation Pilot Plant team. Mission Statement: To provide WIPP employees and stakeholders with relevant, timely information that highlights project accomplishments, incorporates messages related to project goals and advances the WIPP viewpoint. Submissions: Have an article suggestion or submittal? Send an e-mail to the TRU TeamWorks staff.

  13. DOE - NNSA/NFO -- FRMAC Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Groups NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office FRMAC Working Groups As mandated by the Federal Radiological Emergency Response Plan, the U.S. Department of Energy will establish a Federal Radiological Monitoring and Assessment Center (FRMAC) should a potential or major radiological emergency arise. To maintain its capabilities for implementing a FRMAC, the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office's mission is to develop

  14. Earth Day event showcases LANL energy work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Earth Day showcases energy work Earth Day event showcases LANL energy work The public is invited to learn about projects in energy conservation, generation, research, and management at an Energy Town Hall April 21. April 19, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los

  15. Fourth Fridays Downtown - Working with Wind

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays Downtown - Working with Wind Fourth Fridays Downtown - Working with Wind WHEN: Jun 26, 2015 12:00 AM - 11:59 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, New Mexico, USA CONTACT: Jessica Privette 505 667-0375 CATEGORY: Bradbury INTERNAL: Calendar Login Fourth Fridays Downtown Event Description The museum will be open late until 6pm every Fourth Friday offering extended access to exhibits, special programming, and activities. The Los Alamos Creative District is

  16. NREL: International Activities - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us NREL's interaction with industrial, university, and government partners worldwide is the key to moving advanced technologies into the marketplace and the U.S. economy. We provide opportunities to develop technology partnerships and researcher-driven collaboration. Technology Partnerships NREL offers a variety of technology partnership agreements to help you gain access to our research expertise, including our energy analysis capabilities. You can: Work collaboratively with us on

  17. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Nanoscale Chemical Imaging of a Working Catalyst Print Wednesday, 28 January 2009 00:00 The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support,

  18. Who Works for NIF & PS?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    about Who Works for NIF & PS? The National Ignition Facility is the product of thousands of hours of work by some of the world's most creative and visionary scientists, engineers and technicians, supported by a team of construction workers, health and safety experts, computer programmers, accountants, and administrators, among others. Come back to this page often to learn more about the people who make NIF possible. The People of NIF Stories about members of Team NIF NIF Management Profiles

  19. How Particle Accelerators Work | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Particle Accelerators Work How Particle Accelerators Work June 18, 2014 - 4:11pm Addthis Infographic by <a href="/node/379579">Sarah Gerrity</a>, Energy Department. Infographic by Sarah Gerrity, Energy Department. Ben Dotson Ben Dotson Former Project Coordinator for Digital Reform, Office of Public Affairs What are the key facts? A particle accelerator is a machine that accelerates elementary particles, such as electrons or protons, to very high energies. Whether it's

  20. Stirling engine with air working fluid

    DOE Patents [OSTI]

    Corey, John A. (North Troy, NY)

    1985-01-01

    A Stirling engine capable of utilizing air as a working fluid which includes a compact heat exchange module which includes heating tube units, regenerator and cooler positioned about the combustion chamber. This arrangement has the purpose and effect of allowing the construction of an efficient, high-speed, high power-density engine without the use of difficult to seal light gases as working fluids.

  1. DOE Guide to Working with Tribal Nations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guide for DOE Employees WORKING WITH INDIAN TRIBAL NATIONS December 2000 ACKNOWLEDGMENTS The guide was developed for the U.S. Department of Energy by Creighton & Creighton, Inc., under contract to the Office of Intergovernmental and Public Accountability (EM-11). The guide was reviewed by representatives of several tribes and DOE staff who work regularly with tribal nations. However, Creighton & Creighton, Inc., remains responsible for the editorial content of this guide. This guide

  2. EM QA Working Group September 2011 Notes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety Management Champions Workshop Quality Assurance Working Group (Video Conference) Hanford, WA - September 13, 2011 Page 1 of 8 Introduction Bob Murray provided an introduction and addressed the expectations for the meeting. He noted this is not an EM QA Corporate Board Meeting; therefore, the topics should be discussed as a group and not presented by only one person. Audience participation is needed to make the working group successful. Potential Revision to the Performance Indicator and

  3. Work Schedules | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Work Schedules | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA

  4. FINAL Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    Transportation External Coordination Working Group (TEC) January 28-30, 2002 New Orleans, Louisiana Meeting Summary The Transportation External Coordination Working Group (TEC) held its 20 th semi-annual meeting January 28-30, 2002, in New Orleans, Louisiana. This was the tenth anniversary of TEC, and 102 attendees from national, State, Tribal, and local government organizations; industry and professional groups and other interested parties in the U.S. Department of Energy (DOE) programs, met

  5. How Distributed Wind Works | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Wind Works How Distributed Wind Works Your browser does not support iframes. Distributed wind energy systems are commonly installed on, but are not limited to, residential, agricultural, commercial, industrial, and community sites, and can range in size from a 5-kilowatt turbine at a home to a multi-megawatt (MW) turbine at a manufacturing facility. Distributed wind systems are connected on the customer side of the meter to meet the onsite load or directly to distribution or micro

  6. How Hydropower Works | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How Hydropower Works How Hydropower Works Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player Hydropower is using water to power machinery or make electricity. Water constantly moves through a vast global cycle, evaporating from lakes and oceans, forming clouds, precipitating as rain or snow, then flowing back down to the ocean. The energy of this water cycle, which is driven by the sun, can be tapped to produce electricity or for mechanical tasks like

  7. How Microgrids Work | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Microgrids Work How Microgrids Work June 17, 2014 - 10:27am Addthis Microgrid equipment at the National Wind Technology Center in Colorado. | Photo courtesy of the National Renewable Energy Lab. Microgrid equipment at the National Wind Technology Center in Colorado. | Photo courtesy of the National Renewable Energy Lab. Allison Lantero Allison Lantero Digital Content Specialist, Office of Public Affairs How can I participate? Join us today for our microgrids Twitter Office Hours at 2 p.m. ET,

  8. Working with Us | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Us Working with Us Secretary Chu takes a holistic view to diversity, recognizing that the goal of ensuring equal access to participation in the Department's programs and policies comes through in our workforce, our partners, our research, our policies, our education efforts, and our work with the general public. Our core constituenties include: Historically Underrepresented Communities Small Businesses Minority Serving Institutions Departmental Workforce Tribal Communities Minority Banks Stay in

  9. Distributed Parallel Particle Advection using Work Requesting

    SciTech Connect (OSTI)

    Muller, Cornelius; Camp, David; Hentschel, Bernd; Garth, Christoph

    2013-09-30

    Particle advection is an important vector field visualization technique that is difficult to apply to very large data sets in a distributed setting due to scalability limitations in existing algorithms. In this paper, we report on several experiments using work requesting dynamic scheduling which achieves balanced work distribution on arbitrary problems with minimal communication overhead. We present a corresponding prototype implementation, provide and analyze benchmark results, and compare our results to an existing algorithm.

  10. Working memory, situation models, and synesthesia

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Radvansky, Gabriel A.; Gibson, Bradley S.; McNerney, M. Windy

    2013-03-04

    Research on language comprehension suggests a strong relationship between working memory span measures and language comprehension. However, there is also evidence that this relationship weakens at higher levels of comprehension, such as the situation model level. The current study explored this relationship by comparing 10 grapheme–color synesthetes who have additional color experiences when they read words that begin with different letters and 48 normal controls on a number of tests of complex working memory capacity and processing at the situation model level. On all tests of working memory capacity, the synesthetes outperformed the controls. Importantly, there was no carryover benefitmore » for the synesthetes for processing at the situation model level. This reinforces the idea that although some aspects of language comprehension are related to working memory span scores, this applies less directly to situation model levels. As a result, this suggests that theories of working memory must take into account this limitation, and the working memory processes that are involved in situation model construction and processing must be derived.« less

  11. Making PACE Work for Residential (201) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Making PACE Work for Residential (201) Making PACE Work for Residential (201) February 25

  12. Fiscal Year 2011 Work Performed Under the Work for Others Program at Sandia National Laboratories

    Office of Environmental Management (EM)

    Audit Report Fiscal Year 2011 Work Performed Under the Work for Others Program at Sandia National Laboratories OAS-L-13-14 September 2013 Department of Energy Washington, DC 20585 September 25, 2013 MEMORANDUM FOR THE MANAGER, SANDIA FIELD OFFICE FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Fiscal Year 2011 Work Performed Under the Work for Others Program at Sandia National Laboratories"

  13. Fiscal Year 2012 Work Performed Under the Work for Others Program at Los Alamos National Laboratory

    Office of Environmental Management (EM)

    Audit Report Fiscal Year 2012 Work Performed Under the Work for Others Program at Los Alamos National Laboratory OAS-M-14-03 March 2014 Department of Energy Washington, DC 20585 March 12, 2014 MEMORANDUM FOR THE MANAGER, LOS ALAMOS FIELD OFFICE FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Fiscal Year 2012 Work Performed Under the Work for Others Program at Los Alamos National Laboratory" BACKGROUND

  14. CAST STONE TECHNOLOGY FOR TREATMENT & DISPOSAL OF IODINE RICH CAUSTIC WASTE DEMONSTRATION FINAL REPORT

    SciTech Connect (OSTI)

    LOCKREM, L.L.

    2005-07-14

    CH2M HILL is working to develop, design, and construct low-activity waste (LAW) treatment and imcholization systems to supplement the LAW capacity provided by the Waste Treatment and Immobilization Plant. CH2M HILL is investigating use of cast stone technology for treatment and immobilization of caustic solutions containing high concentrations of radioactive Iodine-129.

  15. Novel wastewater treatment processes

    SciTech Connect (OSTI)

    Saber, D.L.

    1996-12-31

    Few fermentation processes are as versatile as anaerobic digestion in terms of utility, application and capability to handle feeds of varied chemical complexity and physical characteristics. The anaerobic digestion process has served the pollution control industry in the US for over 100 years in stabilizing organic sludges and wastewaters; treatment of these high-moisture-content and high-strength aqueous wastes by alternative thermal or aerobic biological processes requires much higher energy inputs than that needed to conduct anaerobic digestion. The anaerobic digestion process has taken on new importance and emphasis in recent years because of its potential application for energy and chemical production from various types of renewable-carbon resources, and because it can be coupled with certain electrochemical, thermochemical and biochemical processes to generate electric power, hydrocarbons, methanol and other high-value products. A number of initiatives have been taken to improve the anaerobic digestion process in keeping with the increasing appreciation for its utility and versatility of application in municipal, industrial and rural settings. Using processes based upon the anaerobic digestion of organic wastes, the Institute of Gas Technology has developed technologies applicable for the treatment of a wide variety of organic wastes. Increased methane gas production and enhanced waste reduction can be achieved through the ACIMET, SOLCON and HIMET Processes, depending upon concentration and characteristics of the incoming organic waste stream. These proprietary IGT waste treatment systems are described.

  16. Environmental Aspects of Two Volatile Organic Compound Groundwater Treatment Designs at the Rocky Flats Site - 13135

    SciTech Connect (OSTI)

    Michalski, Casey C.; DiSalvo, Rick; Boylan, John

    2013-07-01

    DOE's Rocky Flats Site in Colorado is a former nuclear weapons production facility that began operations in the early 1950's. Because of releases of hazardous substances to the environment, the federally owned property and adjacent offsite areas were placed on the CERCLA National Priorities List in 1989. The final remedy was selected in 2006. Engineered components of the remedy include four groundwater treatment systems that were installed before closure as CERCLA-accelerated actions. Two of the systems, the Mound Site Plume Treatment System and the East Trenches Plume Treatment System, remove low levels of volatile organic compounds using zero-valent iron media, thereby reducing the loading of volatile organic compounds in surface water resulting from the groundwater pathway. However, the zero-valent iron treatment does not reliably reduce all volatile organic compounds to consistently meet water quality goals. While adding additional zero-valent iron media capacity could improve volatile organic compound removal capability, installation of a solar powered air-stripper has proven an effective treatment optimization in further reducing volatile organic compound concentrations. A comparison of the air stripper to the alternative of adding additional zero-valent iron capacity to improve Mound Site Plume Treatment System and East Trenches Plume Treatment System treatment based on several key sustainable remediation aspects indicates the air stripper is also more 'environmentally friendly'. These key aspects include air pollutant emissions, water quality, waste management, transportation, and costs. (authors)

  17. Method of making low work function component

    DOE Patents [OSTI]

    Robinson, Vance (Niskayuna, NY); Weaver, Stanton Earl (Northville, NY); Michael, Joseph Darryl (Delmar, NY)

    2011-11-15

    A method for fabricating a component is disclosed. The method includes: providing a member having an effective work function of an initial value, disposing a sacrificial layer on a surface of the member, disposing a first agent within the member to obtain a predetermined concentration of the agent at said surface of the member, annealing the member, and removing the sacrificial layer to expose said surface of the member, wherein said surface has a post-process effective work function that is different from the initial value.

  18. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 10/08/2013 December (no committee mtgs) January February PNNL update on geophysics characterization (where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RI/FS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice 100-N Groundwater Modeling Tutorial Update on Orchard Lands Work Plan o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice Online

  19. Heat treatment furnace

    DOE Patents [OSTI]

    Seals, Roland D; Parrott, Jeffrey G; DeMint, Paul D; Finney, Kevin R; Blue, Charles T

    2014-10-21

    A furnace heats through both infrared radiation and convective air utilizing an infrared/purge gas design that enables improved temperature control to enable more uniform treatment of workpieces. The furnace utilizes lamps, the electrical end connections of which are located in an enclosure outside the furnace chamber, with the lamps extending into the furnace chamber through openings in the wall of the chamber. The enclosure is purged with gas, which gas flows from the enclosure into the furnace chamber via the openings in the wall of the chamber so that the gas flows above and around the lamps and is heated to form a convective mechanism in heating parts.

  20. Water_Treatment.cdr

    Office of Legacy Management (LM)

    Since dewatering at the Weldon Spring site began in 1992, more than 290 million gallons of contaminated water have been treated and released into the Missouri River from two similar water treatment facilities at the site and the nearby Quarry. On September 30, 1999, dewatering efforts at the Chemical Plant site were completed, meeting one of the most substantial milestones of the project and bringing to an end a part of history that was started nearly 5 decades ago. From 1955 to 1966, uranium

  1. Update to Assessment of Direct Disposal in Unsaturated Tuff of Spent Nuclear Fuel and High-Level Waste Owned by U.S. Department of Energy

    SciTech Connect (OSTI)

    P. D. Wheatley; R. P. Rechard

    1998-09-01

    The overall purpose of this study is to provide information and guidance to the Office of Environmental Management of the U.S. Department of Energy (DOE) about the level of characterization necessary to dispose of DOE-owned spent nuclear fuel (SNF). The disposal option modeled was codisposal of DOE SNF with defense high-level waste (DHLW). A specific goal was to demonstrate the influence of DOE SNF, expected to be minor, in a predominately commercial repository using modeling conditions similar to those currently assumed by the Yucca Mountain Project (YMP). A performance assessment (PA) was chosen as the method of analysis. The performance metric for this analysis (referred to as the 1997 PA) was dose to an individual; the time period of interest was 100,000 yr. Results indicated that cumulative releases of 99Tc and 237Np (primary contributors to human dose) from commercial SNF exceed those of DOE SNF both on a per MTHM and per package basis. Thus, if commercial SNF can meet regulatory performance criteria for dose to an individual, then the DOE SNF can also meet the criteria. This result is due in large part to lower burnup of the DOE SNF (less time for irradiation) and to the DOE SNF's small percentage of the total activity (1.5%) and mass (3.8%) of waste in the potential repository. Consistent with the analyses performed for the YMP, the 1997 PA assumed all cladding as failed, which also contributed to the relatively poor performance of commercial SNF compared to DOE SNF.

  2. Form 2A | Open Energy Information

    Open Energy Info (EERE)

    for Permit to Discharge Municipal Wastewater from New and Existing Publicly Owned Treatment Works, current through August 14, 2014. Published NA Year Signed or Took Effect...

  3. The transportation external coordination working group

    SciTech Connect (OSTI)

    1995-10-01

    In an effort to improve coordinated interactions between the United States Department of Energy (DOE) and external groups interested in transportation activities, DOE established the Transportation External Coordination Working Group (TEC/WG). Membership includes representatives from State, Tribal and local governments, industry, and professional organizations. All DOE programs with significant transportation programs participate.

  4. Working on the moon: The Apollo experience

    SciTech Connect (OSTI)

    Jones, E.M.

    1989-01-01

    The successful completion of any scientific or engineering project on the Moon will depend, in part, on human ability to do useful work under lunar conditions. In making informed decisions about such things as the use of humans rather than robots for specific tasks, the scheduling of valuable human time, and the design and selection of equipment and tools, good use can be made of the existing experience base. During the six completed landing missions, Apollo lunar surface crews conducted 160 astronaut-hours of extra-vehicular activities (EVAs) and also spent a similar sum of waking hours working in the cramped confines of the Lunar Module. The first three missions were primarily proof-tests of flight hardware and procedures. The ability to land equipment and consumables was very modest but, despite stay times of no more than 32 hours, the crews of Apollos 11, 12, and 14 were able to test their mobility and their capability of doing useful work outside the spacecraft. For the last three missions, thanks to LM modifications which enabled landings with significant amounts of cargo, stay times more than doubled to three days. The crews were able to use Lunar Rovers to conduct extensive local exploration and to travel up to 10 kilometers away from their immediate landing sites. During these final missions, the astronauts spent enough time doing work of sufficient complexity that their experience should be of use in the formulation early-stage lunar base operating plans. 2 refs.

  5. Cost Codes and the Work Breakdown Structure

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The chapter discusses the purpose of the work breakdown structure (WBS) and code of account (COA) cost code system, shows the purpose and fundamental structure of both the WBS and the cost code system, and explains the interface between the two systems.

  6. Working Capital for Contractors | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Financing Peer Exchange Call: Working Capital for Contractors, Call Slides and Discussion Summary, August 30, 2012. PDF icon Call Slides and Discussion Summary More Documents & Publications Streamline Service Delivery via Customer Communication and Contractor Coordination Focus Series: OREGON-On Bill Financing Program: On-Bill Financing Brings Lenders and Homeowners On Board Lessons from On-Bill Financing and Repayment Programs

  7. Working with Schools | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Residential Network Marketing & Outreach Peer Exchange Call Series: Working with Schools, Call Slides and Summary, April 24, 2014. PDF icon Call Slides and Summary More Documents & Publications Better Buildings Residential Network Orientation Collaborating With Utilities on Residential Energy Efficiency Voluntary Initiative: Partnering to Enhance Program Capacity

  8. Working with Us | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Us Working with Us True to its mission, the office serves to actively facilitate relationships between the Department and Members of Congress, Governors, State/local officials and their staffs, tribal governments, public interest groups representing consumers/citizens organizations, business/industries, civic groups, educational organizations and institutions, and all other energy-oriented stakeholder organizations. Congressional Affairs Congressional Testimony Congressional Resources

  9. Clean Energy Works Oregon (CEWO) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Energy Works Oregon's program background and the four easy steps to lender selection. Clean Energy Works Oregon More Documents & Publications Clean Energy Works Oregon (CEWO)...

  10. 2013 DOE Catalysis Working Group Meeting Agenda | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Catalysis Working Group Meeting Agenda 2013 DOE Catalysis Working Group Meeting Agenda Agenda for the 2013 DOE Catalysis Working Group Meeting on May 15, 2013. PDF icon...

  11. Transportation Plan Ad Hoc Working Group | Department of Energy

    Office of Environmental Management (EM)

    Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group PDF icon Transportation Plan Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and...

  12. Better Buildings Working with Utilities Peer Exchange Call: Kick...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with Utilities Peer Exchange Call: Kick-off Better Buildings Working with Utilities Peer Exchange Call: Kick-off Better Buildings Working with Utilities Peer Exchange Call:...

  13. TEC Working Group Topic Groups Rail Key Documents Intermodal...

    Office of Environmental Management (EM)

    Intermodal Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup Intermodal Subgroup PDF icon Draft Work Plan More Documents & Publications TEC Working...

  14. Microsoft Word - Work Authorization Internal to SSRL v03.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Authorization Work at SSRL is assigned on a distributed basis from the division director down through the organization. This document explains how that work assignment is...

  15. Strategic Partnership Projects [Formerly Known as Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Strategic Partnership Projects is work performed for non-DOE entities by DOE/(NNSA personnel and/or their respective contractor personnel or the use of DOE/NNSA facilities for work that is not directly funded by DOE/NNSA appropriations. This Admin Chg address primarily address references to revised directives and the results of departmental reorganization. In addition, the Secretary directed effective immediately work formerly known as Work for Others (WFO) to be renamed Strategic Partnership Projects (SPPs). Admin Chg 2, dated 3-9-15, supersedes DOE O 481.1C Admin Chg 1, dated 3-14-11.

  16. Advanced Mixed Waste Treatment Project Achieves Impressive Safety and

    Office of Environmental Management (EM)

    Production Marks | Department of Energy Advanced Mixed Waste Treatment Project Achieves Impressive Safety and Production Marks Advanced Mixed Waste Treatment Project Achieves Impressive Safety and Production Marks June 26, 2013 - 12:00pm Addthis Only the 620 employees at EM’s Advanced Mixed Waste Treatment Project earned the right to this vanity plate after working more than 14 million hours without a lost-time injury and safely and compliantly shipping more than 50,000 cubic meters of

  17. The Effect of Cold Work on Properties of Alloy 617

    SciTech Connect (OSTI)

    Richard Wright

    2014-08-01

    Alloy 617 is approved for non-nuclear construction in the ASME Boiler and Pressure Vessel Code Section I and Section VIII, but is not currently qualified for nuclear use in ASME Code Section III. A draft Code Case was submitted in 1992 to qualify the alloy for nuclear service but efforts were stopped before the approval process was completed.1 Renewed interest in high temperature nuclear reactors has resulted in a new effort to qualify Alloy 617 for use in nuclear pressure vessels. The mechanical and physical properties of Alloy 617 were extensively characterized for the VHTR programs in the 1980’s and incorporated into the 1992 draft Code Case. Recently, the properties of modern heats of the alloy that incorporate an additional processing step, electro-slag re-melting, have been characterized both to confirm that the properties of contemporary material are consistent with those in the historical record and to increase the available database. A number of potential issues that were identified as requiring further consideration prior to the withdrawal of the 1992 Code Case are also being re-examined in the current R&D program. Code Cases are again being developed to allow use of Alloy 617 for nuclear design within the rules of the ASME Boiler and Pressure Vessel Code. In general the Code defines two temperature ranges for nuclear design with austenitic and nickel based alloys. Below 427°C (800°F) time dependent behavior is not considered, while above this temperature creep and creep-fatigue are considered to be the dominant life-limiting deformation modes. There is a corresponding differentiation in the treatment of the potential for effects associated with cold work. Below 427°C the principal issue is the relationship between the level of cold work and the propensity for stress corrosion cracking and above that temperature the primary concern is the impact of cold work on creep-rupture behavior.

  18. Clean Energy Works Oregon (CEWO) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Works Oregon (CEWO) Clean Energy Works Oregon (CEWO) Presents an exploration of Clean Energy Works Oregon's loan offerings its on-bill program to date. PDF icon Clean Energy Works ...

  19. Infrared photoemitting diode having reduced work function

    DOE Patents [OSTI]

    Hirschfeld, Tomas B. (Livermore, CA)

    1984-01-01

    In electro-optical detectors which include as elements a photoemitting photocathode and anode, a photoemitting diode is fabricated which lowers the diode's work function, thus reducing the cooling requirement typically needed for this type of device. The work function is reduced by sandwiching between the photocathode and anode a liquid medium of the formula NR.sub.3 and having an electron affinity for the electrons of the photocathode, which liquid medium permits free electrons leaving the photocathode to remain as stable solvated species in the liquid medium. Thus, highly light-absorbent, and therefore thin, metallic layers can be used for detection, thereby reducing dark current at a given temperature, with a consequent reduction in cooling requirements at constant detector performance.

  20. Infrared photoemitting diode having reduced work function

    DOE Patents [OSTI]

    Hirschfeld, T.B.

    1982-05-06

    In electro-optical detectors which include as elements a photoemitting photocathode and anode, a photoemitting diode is fabricated which lowers the diode's work function, thus reducing the cooling requirement typically needed for this type of device. The work function is reduced by sandwiching between the photocathode and anode a liquid meidum of the formula NR/sub 3/ and having an electron affinity for the electrons of the photocathode, which liquid medium permits free electrons leaving the photocathode to remain as stable solvated species in the liquid medium. Thus, highly light-absorbent, and therefore thin, metallic layers can be used for detection, thereby reducing dark current at a given temperature, with a consequent reduction in cooling requirements at constant detector performance.

  1. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  2. Healthy Housing Opportunities During Weatherization Work

    SciTech Connect (OSTI)

    Wilson, J.; Tohn, E.

    2011-03-01

    In the summer and early fall of 2010, the National Center for Healthy Housing interviewed people from a selection of state and local agencies that perform weatherizations on low-income housing in order to gauge their approach to improving the health and safety of the homes. The interviews provided a strong cross section of what work agencies can do, and how they go about funding this work when funds from the Weatherization Assistance Program (WAP) do not cover the full extent of the repairs. The report also makes recommendations for WAP in how to assist agencies to streamline and maximize the health and safety repairs they are able to make in the course of a standard weatherization.

  3. TRUTeamWorks 05-13-04

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13, 2004 By the Numbers High HOPES for science education Shipments scheduled to arrive at WIPP the week of 05/16/04 - 05/22/04: 27 Total shipments received at WIPP as of 05/13/04: 2,578 Total volume disposed at WIPP as of 05/13/04: 20,119 m 3 FY04 Performance Metrics D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A bi-weekly e-newsletter for the Waste Isolation Pilot Plant team All teachers hope for their students' success and thanks to the

  4. Long working distance incoherent interference microscope

    DOE Patents [OSTI]

    Sinclair, Michael B. (Albuquerque, NM); De Boer, Maarten P. (Albuquerque, NM)

    2006-04-25

    A full-field imaging, long working distance, incoherent interference microscope suitable for three-dimensional imaging and metrology of MEMS devices and test structures on a standard microelectronics probe station. A long working distance greater than 10 mm allows standard probes or probe cards to be used. This enables nanometer-scale 3-dimensional height profiles of MEMS test structures to be acquired across an entire wafer while being actively probed, and, optionally, through a transparent window. An optically identical pair of sample and reference arm objectives is not required, which reduces the overall system cost, and also the cost and time required to change sample magnifications. Using a LED source, high magnification (e.g., 50.times.) can be obtained having excellent image quality, straight fringes, and high fringe contrast.

  5. Clean Energy Works Oregon Final Technical Report

    SciTech Connect (OSTI)

    Jacob, Andria; Cyr, Shirley

    2013-12-31

    In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOEs program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

  6. Meeting Summary, Credit Trading Work Group

    SciTech Connect (OSTI)

    Kevin Bryan

    2000-12-07

    OAK-B135 Credit Trading Work Group Meeting Summary. The purpose of the meeting is to: (1) Provide an opportunity for NWCC Work Group Members, NWCC Members, and invited expert participants to hear an overview of the draft NWCC Credit Trading Report and to critically review and discuss the report's recommendations and principles. (2) Hear presentations from several perspectives of other experts on credit trading which provide: (a) a brief summary of credit trading activities they are involved in, and (b) critical responses to the NWCC draft report. (3) Identify how the report can be improved at the big picture level. Attempt to resolve issues or concerns if necessary. (4) Discuss the recommendations and credit trading principles in detail and attempt to reach consensus on these sections for presentation to the NWCC. (5) Discuss if any of the outreach and communication recommendations in the report should be conducted by the NWCC.

  7. Working and Net Available Shell Storage Capacity

    Reports and Publications (EIA)

    2015-01-01

    Working and Net Available Shell Storage Capacity is the U.S. Energy Information Administration’s (EIA) report containing storage capacity data for crude oil, petroleum products, and selected biofuels. The report includes tables detailing working and net available shell storage capacity by type of facility, product, and Petroleum Administration for Defense District (PAD District). Net available shell storage capacity is broken down further to show the percent for exclusive use by facility operators and the percent leased to others. Crude oil storage capacity data are also provided for Cushing, Oklahoma, an important crude oil market center. Data are released twice each year near the end of May (data for March 31) and near the end of November (data for September 30).

  8. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  9. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  10. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  11. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  12. Working at SLAC | Linac Coherent Light Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working at SLAC View map/guide to help get acquainted with SLAC and LCLS. Site Access SLAC has proximity card readers at all entrances and internal gates. Please review Gate Hours & Services and important changes to user badging and access: BEFORE TRAVELING TO SLAC, inform your colleagues about access changes. Ensure all experimenters are listed on proposals & beam time/support requests and complete the following steps: 1. Register through the user portal to provide or update contact

  13. Cold worked ferritic alloys and components

    DOE Patents [OSTI]

    Korenko, Michael K. (Wexford, PA)

    1984-01-01

    This invention relates to liquid metal fast breeder reactor and steam generator precipitation hardening fully ferritic alloy components which have a microstructure substantially free of the primary precipitation hardening phase while having cells or arrays of dislocations of varying population densities. It also relates to the process by which these components are produced, which entails solution treating the alloy followed by a final cold working step. In this condition, the first significant precipitation hardening of the component occurs during high temperature use.

  14. Work with Us | Materials Science | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Us We are eager to pursue materials science research with partners in industry, universities, and other organizations. Contact Us Photo of Nancy Haegel Nancy Haegel Center Director, Materials Science Center Email | 303-384-6548 For lead researcher contacts, see our research areas. To find research group managers or specific researchers, see our listing of research staff. Interested in Joining Our Team? Find an opportunity: Job | Internship | Post-doc Plan Your Visit Map to NREL Golden,

  15. Working with Interpreters | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with Interpreters | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA

  16. Working with SRNL - Our Facilities - EMRL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Materials Research Laboratory High temperature salt corrosion - SunShot Hollow-glass Microspheres Working with SRNL Our Facilities - Energy Materials Research Laboratory (EMRL) The Energy Materials Research Laboratory at the Savannah River National Laboratory (SRNL) creates a cross-disciplinary laboratory facility that lends itself to the integration of research and application of advanced materials that is focused on major laboratory and national initiatives. It drives innovation in

  17. Macro-Industrial Working Group: meeting 1

    Gasoline and Diesel Fuel Update (EIA)

    30 2013 Macroeconomic team: Kay Smith, Russ Tarver, Elizabeth Sendich and Vipin Arora Briefing on Macroeconomic Reference Case for the Annual Energy Outlook 2014 Macroeconomic/Industrial Working Group Meeting Presentation Goals * The Reference Case presented is the GI May Long-term Trend forecast. Due to the comprehensive revision of the GDP accounts, released at the end of July, we will not update the macro projection to an August baseline in order to keep on the AEO2014 schedule. The GI August

  18. AEO2015 Coal Working Group Meeting Summary

    Gasoline and Diesel Fuel Update (EIA)

    AS AEO2015 MODELING ASSUMPTIONS AND INPUTS ARE SUBJECT TO CHANGE. 1 July 30, 2014 MEMORANDUM TO: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Director, Office of Electricity, Coal, Nuclear, and Renewables Analysis FROM: Coal and Uranium Analysis Team SUBJECT: AEO2015 Coal Working Group Meeting I Summary Attendees (39) Name Affiliation Greg Adams (Moderator) US DOE: EIA Jim Diefenderfer Tyler Hodge Elias Johnson Ayaka Jones Eric Krall Laura Martin Mike Mellish Kate

  19. AEO2015 Transportation Working Group Meeting

    Gasoline and Diesel Fuel Update (EIA)

    Transportation Working Group Meeting Wednesday, July 30, 2014 2:00 - 3:00 p.m. Attendees in person: Austin Brown (NREL) Christopher Ramig (EPA) David Babson (EPA) Devi Mishra (EIA) John Maples (EIA) Lauren Rafelski (EPA) Mindi Farber-DeAnda (EIA) Nicholas Chase (EIA) Patricia Hutchins (EIA) Salil Deshpande (Energetics) Tom Stephens (ANL) Tom White (DOE) Attendees on the phone: Aaron Hula (EPA) Alicia Birky (TA Engineering) Chris Nevers (EPA) Chris Roof (Volpe) Christopher Grillo (IHS) Dallas

  20. Lab resumes work on NMSSUP security project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NMSSUP Security Project Lab resumes work on NMSSUP security project The project adds fences, cameras, sensors, utility and access buildings, and other systems to the existing security infrastructure around the Lab's principal plutonium processing facility. February 6, 2013 When complete, these barriers will be a portion of the NMSSUP upgrade. When complete, these barriers will be a portion of the NMSSUP upgrade. (LA-UR-12-26312) The project integrates a number of security technologies for the

  1. Working with SRNL - Technology Transfer - Tech Briefs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3/2016 SEARCH SRNL GO Tech Briefs Contacts Ombudsman Tech Home SRNL Home Working with SRNL - Technology Transfer Tech Briefs Examples of SRNL technologies available for collaboration (CRADA) and licensing. Remote Electrical Throw Device Magnetic Release Coupling InviziMark: Concealed Identification System Elemental Mercury Probe Environmental Biocatalyst - BioTiger(tm) Microbial Based Chlorinated Ethene Destruction Boron-Structured Nano-Proportional Counters Acoustic Door Latch Detector (Smart

  2. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  3. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  4. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  5. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  6. Nanoscale Chemical Imaging of a Working Catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoscale Chemical Imaging of a Working Catalyst Print The heterogeneous catalysts used in most chemical processes typically consist of nanoscale metal or metal oxide particles dispersed on high-surface-area supports. While these particles are the active elements of the catalyst, the overall performance depends not only on their size and composition but also on their multiple interactions with the support, reactants, and products. Probing this chemical soup in real time under realistic reaction

  7. Sandia National Laboratories: Working with Sandia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Sandia Doing Business with Sandia Sandia is dedicated to purchasing quality products and services required to meet our national security mission Leverage the resources of Sandia Exceptional opportunities are available for licensing Sandia's intellectual property Small Business Utilization Sandia's commitment to supplier diversity is key to our mission success Procurement Procurement Home Opportunities Potential Suppliers What Does Sandia Buy? Current Suppliers Woman operating

  8. Working at NNSA | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    at NNSA | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home

  9. TEC Working Group Background | Department of Energy

    Energy Savers [EERE]

    Background TEC Working Group Background Through the TEC/WG, DOE interacted with representatives of organizations at the state, tribal, and local levels to obtain input for program needs assessment, development and management, and to enhance their capability to carry out transportation emergency preparedness and safety activities specifically related to radioactive materials shipments. TEC membership included representatives from national, state, tribal and local government organizations, labor,

  10. TEC Working Group Members | Department of Energy

    Energy Savers [EERE]

    Members TEC Working Group Members TEC members represent many different national, regional, tribal, state and local governmental, labor, industry and professional groups. To maximize the opportunity for broad-based input and information exchange, no single state, local or tribal governmental, or other entity is itself a member. Instead, membership is composed of organizations representing those perspectives. DOE programs participate in TEC by providing regular updates on key activities and

  11. Working Fluids Low Global Warming Potential Refrigerants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Fluids Low GWP Refrigerants - CRADA Ed Vineyard Oak Ridge National Laboratory vineyardea@ornl.gov (865) 574-0576 3 April 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: - High GWP refrigerants increase CO 2 equivalent emissions for HVAC&R equipment - Low GWP alternatives may increase energy consumption, introduce safety risks, require significant modifications to equipment, and have higher costs Impact of Project: - Primary market

  12. Working Fluids: Low Global Warming Potential Refrigerants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Fluids: Low Global Warming Potential Refrigerants 2014 Building Technologies Office Peer Review Omar Abdelaziz, abdelazizoa@ornl.gov Oak Ridge National Laboratory Honeywell University of Maryland Project Summary Timeline: Start date: 01-Oct-2010 Planned end date: 30-Sep-2016 Key Milestones 1. Data analysis and reporting of supermarket system: baseline and alternative refrigerants; 12/31/2014 2. Perform initial field testing of alternative refrigerant in 3 rd party installation; 9/30/2014

  13. July 2012, Training Work Group Status Overview

    Office of Environmental Management (EM)

    Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business

  14. Indian Country Energy and Infrastructure Working Group

    Office of Environmental Management (EM)

    INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORKING GROUP ICEIWG APPROVED MEMBERS Blue Lake Rancheria  Jana Ganion, BLR Energy Director Confederated Tribes of the Warm Springs Reservation of Oregon  Chief Delvis Health  Jim Manion, General Manager, Warm Springs Power Ewiiaapaayp Band of Kumeyaay Indians  William Micklin, CEO Gila River Indian Community  Robert Stone, District 5 Community Councilman Ho-Chunk Nation  Representative Susan Waukon Mississippi Band of Choctaw Indians

  15. Water Electrolysis Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Water Electrolysis Working Group, inaugurated in May 2007, brings industry, academia, and national laboratories together to overcome the technical barriers to commercializing electrolysis technology for the production of hydrogen for transportation and industrial use. Description Technical Targets Progress and Financial Opportunities Contacts Description Water electrolysis is the conversion of electrical energy into chemical energy in the form of hydrogen with oxygen as a useful byproduct. The

  16. Many Voices Working for the Community

    Office of Environmental Management (EM)

    2, 2014 Minutes The Oak Ridge Site Specific Advisory Board (ORSSAB) held a work session on Wednesday, November 12, 2014, at Olive Garden Restaurant, 7206 Kingston Pike, Knoxville, Tenn., beginning at 6 p.m. Members Present Jimmy Bell Noel Berry Alfreda Cook Lisa Hagy, Secretary Bob Hatcher David Hemelright, Chair Jennifer Kasten Jan Lyons, Vice Chair Fay Martin Donald Mei Greg Paulus Belinda Price Mary Smalling Coralie Staley Scott Stout Members Absent Howard Holmes Wanda Smith Wanfang Zhou

  17. Many Voices Working for the Community

    Office of Environmental Management (EM)

    3, 2015 Meeting Minutes The Oak Ridge Site Specific Advisory Board (ORSSAB) held a work session on Wednesday, May 13, at Shoney's Restaurant, 204 South Illinois Ave., Oak Ridge, Tenn., beginning at 6 p.m. Members Present Leon Baker Alfreda Cook Lisa Hagy, Secretary Bob Hatcher David Hemelright, Chair Howard Holmes Terri Likens Jan Lyons, Vice Chair Fay Martin Donald Mei Greg Paulus Belinda Price Coralie Staley Ed Trujillo Members Absent Jimmy Bell 1 Jennifer Kasten 1 Mary Smalling 1 Scott Stout

  18. Determining How Magnetic Helicity Injection Really Works

    SciTech Connect (OSTI)

    Paul M. Bellan

    2001-10-09

    OAK-B135 The goal of the Caltech program is to determine how helicity injection works by investigating the actual dynamics and topological evolution associated with magnetic relaxation. A new coaxial helicity injection source has been constructed and brought into operation. The key feature of this source is that it has maximum geometric simplicity. Besides being important for fusion research, this work also has astrophysical implications. Photos obtained using high-speed cameras show a clear sequence of events in the formation process. In particular, they show initial merging/reconnection processes, jet-like expansion, kinking, and separation of the plasma from the source. Various diagnostics have been developed, including laser induced fluorescence and soft x-ray detection using high speed diodes. Gas valves have been improved and a patent disclosure relating to puffed gas valves has been filed. Presentations on this work have been given in the form of invited talks at several university physics departments that were previously unfamiliar with laboratory plasma experiments.

  19. Cold moderator test facilities working group

    SciTech Connect (OSTI)

    Bauer, Guenter S.; Lucas, A. T.

    1997-09-01

    The working group meeting was chaired by Bauer and Lucas.Testing is a vital part of any cold source development project. This applies to specific physics concept verification, benchmarking in conjunction with computer modeling and engineering testing to confirm the functional viability of a proposed system. Irradiation testing of materials will always be needed to continuously extend a comprehensive and reliable information database. An ever increasing worldwide effort to enhance the performance of reactor and accelerator based neutron sources, coupled with the complexity and rising cost of building new generation facilities, gives a new dimension to cold source development and testing programs. A stronger focus is now being placed on the fine-tuning of cold source design to maximize its effectiveness in fully exploiting the facility. In this context, pulsed spallation neutron sources pose an extra challenge due to requirements regarding pulse width and shape which result from a large variety of different instrument concepts. The working group reviewed these requirements in terms of their consequences on the needs for testing equipment and compiled a list of existing and proposed facilities suitable to carry out the necessary development work.

  20. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working in Residential Energy Efficiency Upgrade Programs - Promising Approaches and Lessons Learned What's Working in Residential Energy Efficiency Upgrade Programs -...