National Library of Energy BETA

Sample records for overhead power lines

  1. Overhead electric power transmission line jumpering system for bundles of five or more subconductors

    DOE Patents [OSTI]

    Winkelman, Paul F.

    1982-01-01

    Jumpering of electric power transmission lines at a dead end tower. Two transmission line conductor bundles each contain five or more spaced apart subconductors (5) arranged in the shape of a cylinder having a circular cross section. The ends of each bundle of subconductors are attached with insulators to a dead end tower (1). Jumpering allows the electric current to flow between the two bundles of subconductors using jumper buses, internal jumper conductors, and external jumper conductors. One or more current collecting jumper buses (37) are located inside each bundle of subconductors with each jumper bus being attached to the end of a subconductor. Small-diameter internal jumper conductors (33) are located in the inherently electrically shielded area inside each bundle of subconductors with each subconductor (except ones having an attached jumper bus) having one internal jumper conductor connected between that subconductor's end and a jumper bus. Large-diameter external jumper conductors (9) are located outside each bundle of subconductors with one or more external jumper conductors being connected between the jumper buses in one bundle of subconductors and the jumper buses in the other bundle.

  2. Operating Experience Level 3, Danger! Equipment Hits Overhead Lines

    Broader source: Energy.gov [DOE]

    OE-3 2016-01: This Operating Experience Level 3 (OE-3) document provides information about a safety concern related to workers and operations at Department of Energy (DOE) facilities where equipment has struck overhead communication cables and energized power lines.

  3. Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines

    SciTech Connect (OSTI)

    Phillips, A.

    2013-01-31

    In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

  4. From: Laurie Smith To: Congestion Study Comments Subject: Taking of Private Property for Overhead Transmission Lines

    Office of Environmental Management (EM)

    Taking of Private Property for Overhead Transmission Lines Date: Friday, September 19, 2014 9:18:01 AM Scores of people in my area are opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons: First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. The easements prevent the landowner from

  5. Power line detection system

    DOE Patents [OSTI]

    Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

    1994-01-01

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

  6. Power line detection system

    DOE Patents [OSTI]

    Latorre, V.R.; Watwood, D.B.

    1994-09-27

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  7. A probabilistic approach to calculating AC induction levels on power line collocated pipelines

    SciTech Connect (OSTI)

    Dabkowski, J. [Electro Sciences, Inc., Crystal Lake, IL (United States)

    1995-12-01

    For calculating induced voltage levels on pipelines paralleling overhead power lines available computational methods assume that the line circuit currents are balanced, i.e., equal. In this paper probabilistic computational methods are used to calculate induction levels for the more realistic assumption that the line currents carry a small randomly fluctuating component, and therefore, are unbalanced. Results show that limiting consideration to the balanced currents case can result in substantially underestimated induced voltage levels on the pipeline.

  8. Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines

    SciTech Connect (OSTI)

    Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

    1991-10-01

    Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

  9. Ames Lab 101: Next Generation Power Lines

    ScienceCinema (OSTI)

    Russell, Alan

    2012-08-29

    Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

  10. factsheet - trees and power lines - July 2008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trees and power lines July 2008 This summer, BPA maintenance crews are inspecting and clearing high-growing vegetation from all 8,500- miles (15,000 circuit miles) of our...

  11. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  12. Increasing the Capacity of Existing Power Lines

    Energy Savers [EERE]

    ENERGY AND ENVIRONMENT Continued next page In the continental United States, some 500 power companies operate a complex network of more than 160,000 miles of high-voltage trans- mission lines known as "the grid." The capacity of the grid has been largely unchanged for decades and needs to expand to accommodate new power plants and renewable energy projects. The difference in time and cost between using existing transmission lines or the construction of new ones can make or break plans

  13. Green Power Transmission Line Given New Life | Department of Energy

    Office of Environmental Management (EM)

    Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power

  14. INVESTIGATION OF A DYNAMIC POWER LINE RATING CONCEPT FOR IMPROVED WIND ENERGY INTEGRATION OVER COMPLEX TERRAIN

    SciTech Connect (OSTI)

    Jake P. Gentle; Kurt S Myers; Tyler B Phillips; Inanc Senocak; Phil Anderson

    2014-08-01

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of power line to be based on real-time conductor temperature dependent on local weather conditions. In current practice overhead power lines are generally given a conservative rating based on worst case weather conditions. Using historical weather data collected over a test bed area, we demonstrate there is often additional transmission capacity not being utilized with the current static rating practice. We investigate a new dynamic line rating methodology using computational fluid dynamics (CFD) to determine wind conditions along transmission lines at dense intervals. Simulated results are used to determine conductor temperature by calculating the transient thermal response of the conductor under variable environmental conditions. In calculating the conductor temperature, we use both a calculation with steady-state assumption and a transient calculation. Under low wind conditions, steady-state assumption predicts higher conductor temperatures that could lead to curtailments, whereas transient calculations produce conductor temperatures that are significantly lower, implying the availability of additional transmission capacity.

  15. Suggested Practices for Avian Protection on Power Lines | Open...

    Open Energy Info (EERE)

    with federal laws protecting and enhancing avian populations, and maintaining the reliability of electric power networds. Author Avian Power Line Interaction Committee...

  16. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, ...

  17. Electric power high-voltage transmission lines: Design options, cost, and electric and magnetic field levels

    SciTech Connect (OSTI)

    Stoffel, J.B.; Pentecost, E.D.; Roman, R.D.; Traczyk, P.A.

    1994-11-01

    This report provides background information about (1) the electric and magnetic fields (EMFs) of high-voltage transmission lines at typical voltages and line configurations and (2) typical transmission line costs to assist on alternatives in environmental documents. EMF strengths at 0 {+-} 200 ft from centerline were calculated for ac overhead lines, and for 345 and 230-kV ac underground line and for a {+-}450-kV dc overhead line. Compacting and height sensitivity factors were computed for the variation in EMFs when line conductors are moved closer or raised. Estimated costs for the lines are presented and discussed so that the impact of using alternative strategies for reducing EMF strengths and the implications of implementing the strategies can be better appreciated.

  18. Power Line Plan of Development Outline | Open Energy Information

    Open Energy Info (EERE)

    Line Plan of Development Outline Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Power Line Plan of Development OutlineLegal...

  19. Increasing the Capacity of Existing Power Lines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Increasing the Capacity of Existing Power Lines Increasing the Capacity of Existing Power Lines The capacity of the grid has been largely unchanged for decades and needs to expand to accommodate new power plants and renewable energy projects. The difference in time and cost between using existing transmission lines or the construction of new ones can make or break plans for new wind or solar farms. PDF icon inl_powerline_cooling_factsheet.pdf More Documents & Publications EIS-0183: Record of

  20. Computing Criticality of Lines in Power Systems

    SciTech Connect (OSTI)

    Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

    2006-10-13

    We propose a computationally efficient method based onnonlinear optimization to identify critical lines, failure of which cancause severe blackouts. Our method computes criticality measure for alllines at a time, as opposed to detecting a single vulnerability,providing a global view of the system. This information on criticality oflines can be used to identify multiple contingencies by selectivelyexploring multiple combinations of broken lines. The effectiveness of ourmethod is demonstrated on the IEEE 30 and 118 bus systems, where we canvery quickly detect the most critical lines in the system and identifysevere multiple contingencies.

  1. Increasing the Capacity of Existing Power Lines

    SciTech Connect (OSTI)

    2013-04-01

    The capacity of the grid has been largely unchanged for decades and needs to expand to accommodate new power plants and renewable energy projects.

  2. Power Line Integrity Monitor and Repeater

    Energy Science and Technology Software Center (OSTI)

    2005-09-30

    The Idaho National Laboratory (INL) has developed a power system integrity monitor and repeater that provide real time status of the integrity of the physical structure of power poles and transmission towers. It may be applied to other structures, such as pipelines or cell towers, which have multiple segments that can cover hundreds of miles. Sensors and on-board processing provide indication of tampering or impending damage to the structure with information provided to the centralmore » operations center or supervisory control and data acquisition (SCADA) for mitigative actions. This software runs on a series of small, inexpensive, low power electronic sensor platforms that are mounted on each tower of an electric power transmission or distribution system for the purpose of communicating system integrity to a central location. The software allows each platform to: 1) interface with sensors that monitor tower integrity, 2) record and analyze events, 3) communicate sensor information to other sensor platforms located on adjacent towers or to a central monitoring location, and 4) derive, conserve, and store platform power from the transmission of electric power.« less

  3. Method and apparatus for line power monitoring for uninterruptible power supplies

    SciTech Connect (OSTI)

    Baxter, R.V. Jr.; Stich, F.A.

    1993-07-20

    AC line waveform monitoring apparatus is described for detecting AC line power faults and providing a fault signal for control of an uninterruptible power supply comprising: (a) means for sampling an AC line power signal at times synchronized with the cycle of the AC line waveform; (b) means for producing a reference waveform at selected sample times during the period of the AC line signal given previous reference waveform values and a prior cycle wherein a reference waveform value at each sample time comprises a selectively weighted average of value at that sample time in the prior cycle of the AC line signal and the previous reference waveform value at that sample time; (c) an uninterruptible power supply including an auxiliary power supply battery, the uninterruptible power supply receiving the AC line power and normally providing the AC line power to a load and responsive to a fault signal to switch to provide power to the load from the battery; (d) means for comparing the AC line signal waveform with the reference waveform at corresponding times in the reference waveform and the signal waveform and providing the fault signal to the uninterruptible power supply so that it provides power to the load from the battery when a selected difference condition is exceeded.

  4. Early environmental planning: A process for power line corridor selection

    SciTech Connect (OSTI)

    Haagenstad, T.; Bare, C.M.

    1998-12-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory`s electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures.

  5. Development and application of composite overhead ground wire with optical fibers

    SciTech Connect (OSTI)

    Tsujimoto, K.; Kato, T.; Okazato, A.; Sakurada, H.

    1983-05-01

    A overhead ground wire composed with optical fibers has been developed, as well as the accessories and the joints. The overhead ground wire is provided with an aluminum pipe at the core thereof in which the optical fibers are inserted. The composite overhead ground wire with optical fibers was installed for the Kaga-Reinan 500 kV overhead transmission line in autumn, 1981 for the purposes of observing lightning and using as telecommunication line, as well. After the successful performance of the optical fiber, especially in view of transmission loss after installation, has been proved, the composite overhead ground wire is now being checked for the purposes as stated above. The ground wire was also installed for the Tsuruga Test Line at about the same time and investigations were started to confirm the reliability of the optical fiber to be over a long period of time under severe meteorological conditions such as strong winds and icing. The construction of the composite ground wire with optical fibers is such that the optical fibers contained therein are not restrained by the ground wire itself. This enables insertion and pulling out of optical fiber cables. Tests were conducted at certain sections of the Kaga-Reinan Line to confirm that there was no change in the performance of the optical fibers due to such operations of insertion and pulling out. This report briefly discusses the development of the composite ground wire with optical fibers, its installation and the test results.

  6. SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results This paper provides...

  7. Fuel Cell Transit Buses: ThunderPower Bus Evaluation at SunLine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buses: ThunderPower Bus Evaluation at SunLine Transit Agency Fuel Cell Transit Buses: ThunderPower Bus Evaluation at SunLine Transit Agency Report details the six-month evaluation...

  8. The Business Case for Fuel Cells 2014: Powering the Bottom Line...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Business Case for Fuel Cells 2014: Powering the Bottom Line for Businesses and ... PDF icon The Business Case for Fuel Cells 2014: Powering the Bottom Line for Businesses ...

  9. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  10. SunLine Transit Agency Hydrogen-Powered Transit Buses: Evaluation Results

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update | Department of Energy Agency Hydrogen-Powered Transit Buses: Evaluation Results Update SunLine Transit Agency Hydrogen-Powered Transit Buses: Evaluation Results Update This report provides an update on the evaluation results for hydrogen and CNG-fueled buses opertating at SunLine Transit Agency in California. PDF icon 42080.pdf More Documents & Publications SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency

  11. SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation Results | Department of Energy Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results This paper provides preliminary results from an evaluation by DOE's National Renewable Energy Laboratory of hydrogen-powered transit buses at SunLine Transit Agency. PDF icon 41001.pdf More Documents & Publications SunLine Transit Agency Hydrogen-Powered Transit Buses: Evaluation Results

  12. Microsoft PowerPoint - one line pdfs for 1222.pptx

    Broader source: Energy.gov (indexed) [DOE]

    Preliminary One-Line Drawings Future Optima Substation Modified Shelby Substation

  13. Power Lines and Crops Can Be Good Neighbors

    SciTech Connect (OSTI)

    2010-08-01

    Two of the Pacific Northwests greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the regions farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration which owns and operates three-quarters of the regions high-voltage transmission recognizes the importance of our regions agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our regions electricity system. By working together, BPA and landowners can protect the system and public safety.

  14. SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report and Appendices | Department of Energy and Appendices SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report and Appendices This report describes operations at SunLine Transit Agency for a protoype fuel cell bus, a prototype hydrogen hybrid interal combustion engine bus, and five new compressed natural gas buses. PDF icon 43741-1.pdf More Documents & Publications SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine

  15. Microsoft Word - Broadband Over Power Lines_FINAL.06.01.10.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Broadband over Powerlines Can Accelerate the Transmission Smart Grid May 25, 2010 DOE/NETL-2010/1418 Broadband Over Power Lines Could Accelerate the Transmission Smart Grid Broadband Over Power Lines Could Accelerate the Transmission Smart Grid 1 Prepared by: Booz Allen Hamilton (BAH) Bruce Renz Renz Consulting, LLC DOE Contract number: DE-FE000400 Broadband Over Power Lines Could Accelerate the Transmission Smart Grid 2 Acknowledgements This report was prepared by Booz Allen Hamilton, Inc.

  16. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland

    Office of Environmental Management (EM)

    and Delaware | Department of Energy 5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware February 4, 2011 EIS-0465: Announcement of Public Scoping Meetings Construction of Phase II of

  17. SunLine Transit Agency, Hydrogen Powered Transit Buses: Preliminary Evaluation Results

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2007-02-01

    This paper provides preliminary results from an evaluation by DOE's National Renewable Energy Laboratory of hydrogen-powered transit buses at SunLine Transit Agency.

  18. A Testing Platform for Validation of Overhead Conductor Aging Models and Understanding Thermal Limits

    SciTech Connect (OSTI)

    Irminger, Philip; Starke, Michael R; Dimitrovski, Aleksandar D; Young II, Marcus Aaron; Rizy, D Tom; Stovall, John P; Overholt, Philip N

    2014-01-01

    Power system equipment manufacturers and researchers continue to experiment with novel overhead electric conductor designs that support better conductor performance and address congestion issues. To address the technology gap in testing these novel designs, Oak Ridge National Laboratory constructed the Powerline Conductor Accelerated Testing (PCAT) facility to evaluate the performance of novel overhead conductors in an accelerated fashion in a field environment. Additionally, PCAT has the capability to test advanced sensors and measurement methods for accessing overhead conductor performance and condition. Equipped with extensive measurement and monitoring devices, PCAT provides a platform to improve/validate conductor computer models and assess the performance of novel conductors. The PCAT facility and its testing capabilities are described in this paper.

  19. Fuel Cell Transit Buses: ThunderPower Bus Evaluation at SunLine Transit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency | Department of Energy Buses: ThunderPower Bus Evaluation at SunLine Transit Agency Fuel Cell Transit Buses: ThunderPower Bus Evaluation at SunLine Transit Agency Report details the six-month evaluation of the ThunderPower hydrogen fuel cell bus demonstrated at SunLine Transit Agency. PDF icon sunline_report.pdf More Documents & Publications SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact

  20. SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report -- Appendices | Department of Energy -- Appendices SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report -- Appendices This report describes operations at SunLine Transit Agency for a protoype fuel cell bus, a prototype hydrogen hybrid interal combustion engine bus, and five new compressed natural gas buses. For main report, see NREL/TP-560-43741. PDF icon 43741-2.pdf More Documents & Publications SunLine Transit Agency, Hydrogen-Powered Transit Buses:

  1. Electric Power Lines : Questions and Answers on Research into Health Effects.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-05-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  2. The effect of power line phase current correlation on magnetic field statistics

    SciTech Connect (OSTI)

    Dabkowski, J. [Electro Sciences, Inc., Crystal Lake, IL (United States)

    1995-09-01

    Due to normally occurring line currents unbalance, the magnetic field strength will fluctuate in time. The minimum field occurs when the phase currents are balanced, i.e. equal in magnitude and equally spaced in angle. The maximum field levels are obtained when the line currents` fluctuations are statistically independent, and hence, uncorrelated. It is shown that the earth return current due to the unbalance, and therefore, the strength of the magnetic field variations are a function of the line`s phase currents correlation. Power lines whose phase currents are highly correlated will produce a smaller increase in the magnetic field levels for a given percentage of current unbalance.

  3. SunLine Transit Agency Hydrogen-Powered Transit Buses: Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunLine Transit Agency Hydrogen-Powered Transit Buses: Evaluation Results Update This report provides an update on the evaluation results for hydrogen and CNG-fueled buses ...

  4. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  5. The Business Case for Fuel Cells 2014: Powering the Bottom Line for

    Energy Savers [EERE]

    Businesses and Communities | Department of Energy The Business Case for Fuel Cells 2014: Powering the Bottom Line for Businesses and Communities The Business Case for Fuel Cells 2014: Powering the Bottom Line for Businesses and Communities This report, written and compiled by Breakthrough Technologies Institute (BTI) with support from the Fuel Cell Technologies Office, provides an overview of fuel cell installations at businesses and municipal buildings or facilities run by non-profit

  6. Chapter 13 - OVERHEAD AND GANTRY CRANES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electric powered, but can be air powered or hand-chain operated. These cranes may be cab operated, pulpit operated, floor operated, or remotely operated. Such cranes are...

  7. Electric Power Lines : Questions and Answers on Research into Health Effects.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  8. On-line diagnostic system for power generators

    SciTech Connect (OSTI)

    Skormin, V.A.; Goodenough, G.S.; Huber, R.K.

    1996-12-31

    A novel approach to diagnostics of a power generator is developed. It utilizes readily available data acquired by the existing computer-based monitoring/control system. Diagnostic procedures detect various trends in the generator data and interpret these trends in the generator data and interpret these trends as changes in the generator performance caused by incipient failures. Results of trend analyses, subjected to statistical validation, facilitate failure prediction and identification thus providing the justification for service when needed. The procedures are incorporated in a diagnostic system implemented in a PC interfaced with the existing VAX-based process monitoring and control system. The diagnostic system provides graphical display of the diagnostic messages.

  9. DOE-HDBK-1141-2001; Radiological Assessor Training, Overheads

    Office of Environmental Management (EM)

    6.1 DOE-HDBK-1141-2001 Overhead 6.1 Radiological Aspects of Uranium Objectives: * Identify the radiological properties of uranium. * Describe the toxicological properties and behavior of uranium. * Identify appropriate instrumentation, measurement techniques, and special radiological survey methods for uranium. OT 6.2 DOE-HDBK-1141-2001 Overhead 6.2 Radiological Aspects of Uranium (cont.) Objectives: * Describe personnel protection requirements, external dose control techniques, and internal

  10. DOE-HDBK-1141-2001; Radiological Assessor Training, Overheads

    Office of Environmental Management (EM)

    13.1 Overhead 13.1 DOE-HDBK-1141-2001 Radiological Aspects of Accelerators Objectives: * Identify the general characteristics of accelerators. * Identify the types of particles accelerated. * Identify the two basic types of accelerators. * Identify uses for accelerators. * Define prompt radiation. * Identify prompt radiation sources. OT 13.2 Overhead 13.2 DOE-HDBK-1141-2001 Radiological Aspects of Accelerators (cont.) Objectives: * Define radioactivation. * Explain how contaminated material

  11. Electric Power Lines : Questions and Answers on Research into Health Effects.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-06-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the EMF (electric and magnetic fields) produced by power lines and other electrical devices affect our health. Although no adverse health effects of electric power EMF have been confirmed, there is continued scientific uncertainty about this issue. Research on EMF is ongoing throughout the world. The purpose of this booklet is to answer some common questions that the BPA (Bonneville Power Administration) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  12. System for transmitting low frequency analog signals over AC power lines

    DOE Patents [OSTI]

    Baker, Steven P. (Powell, TN); Durall, Robert L. (Lenoir City, TN); Haynes, Howard D. (Knoxville, TN)

    1989-01-01

    A system for transmitting low frequency analog signals over AC power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an AC power line. The modulation signal frequency range in selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the AC power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal.

  13. A system for tranmitting low frequency analog signals over ac power lines

    DOE Patents [OSTI]

    Baker, S.P.; Durall, R.L.; Haynes, H.D.

    1987-07-30

    A system for transmitting low frequency analog signals over ac power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an ac power line. The modulation signal frequency range is selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the ac power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal. 4 figs.

  14. EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700-foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line, originally filed as FES 75-79.

  15. Bias-field controlled phasing and power combination of gyromagnetic nonlinear transmission lines

    SciTech Connect (OSTI)

    Reale, D. V. Bragg, J.-W. B.; Gonsalves, N. R.; Johnson, J. M.; Neuber, A. A.; Dickens, J. C.; Mankowski, J. J.

    2014-05-15

    Gyromagnetic Nonlinear Transmission Lines (NLTLs) generate microwaves through the damped gyromagnetic precession of the magnetic moments in ferrimagnetic material, and are thus utilized as compact, solid-state, frequency agile, high power microwave (HPM) sources. The output frequency of a NLTL can be adjusted by control of the externally applied bias field and incident voltage pulse without physical alteration to the structure of the device. This property provides a frequency tuning capability not seen in many conventional e-beam based HPM sources. The NLTLs developed and tested are mesoband sources capable of generating MW power levels in the L, S, and C bands of the microwave spectrum. For an individual NLTL the output power at a given frequency is determined by several factors including the intrinsic properties of the ferrimagnetic material and the transmission line structure. Hence, if higher power levels are to be achieved, it is necessary to combine the outputs of multiple NLTLs. This can be accomplished in free space using antennas or in a transmission line via a power combiner. Using a bias-field controlled delay, a transient, high voltage, coaxial, three port, power combiner was designed and tested. Experimental results are compared with the results of a transient COMSOL simulation to evaluate combiner performance.

  16. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  17. Determination of High-Frequency Current Distribution Using EMTP-Based Transmission Line Models with Resulting Radiated Electromagnetic Fields

    SciTech Connect (OSTI)

    Mork, B; Nelson, R; Kirkendall, B; Stenvig, N

    2009-11-30

    Application of BPL technologies to existing overhead high-voltage power lines would benefit greatly from improved simulation tools capable of predicting performance - such as the electromagnetic fields radiated from such lines. Existing EMTP-based frequency-dependent line models are attractive since their parameters are derived from physical design dimensions which are easily obtained. However, to calculate the radiated electromagnetic fields, detailed current distributions need to be determined. This paper presents a method of using EMTP line models to determine the current distribution on the lines, as well as a technique for using these current distributions to determine the radiated electromagnetic fields.

  18. Horizontal cryogenic bushing for the termination of a superconducting power-transmission line

    DOE Patents [OSTI]

    Minati, K.F.; Morgan, G.H.; McNerney, A.J.; Schauer, F.

    1982-07-29

    A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminated the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

  19. Termination for a superconducting power transmission line including a horizontal cryogenic bushing

    DOE Patents [OSTI]

    Minati, Kurt F. (Northport, NY); Morgan, Gerry H. (Patchogue, NY); McNerney, Andrew J. (Shoreham, NY); Schauer, Felix (Upton, NY)

    1984-01-01

    A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminates the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

  20. DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

  1. The Business Case for Fuel Cells 2014: Powering the Bottom Line for Businesses and Communities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Business Case for Fuel Cells 2014: Powering the Bottom Line for Businesses and Communities ii Authors and Acknowledgements This report was written and compiled by Sandra Curtin and Jennifer Gangi of the Breakthrough Technologies Institute (BTI) in Washington, D.C. Support was provided by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Fuel Cell Technologies Office. About This Report This report provides an overview of fuel cell installations at

  2. INTEGRATED VERTICAL AND OVERHEAD DECONTAMINATION (IVOD) SYSTEM

    SciTech Connect (OSTI)

    M.A. Ebadian, Ph.D.

    2001-01-01

    The deactivation and decommissioning of 1200 buildings within the U.S. Department of Energy-Office of Environmental Management complex will require the disposition of a large quantity of contaminated concrete and metal surfaces. It has been estimated that 23 million cubic meters of concrete and over 600,000 tons of metal will need disposition. The disposition of such large quantities of material presents difficulties in the area of decontamination and characterization. The final disposition of this large amount of material will take time and money as well as risk to the D&D work force. A single automated system that would decontaminate and characterize surfaces in one step would not only reduce the schedule and decrease cost during D&D operations but would also protect the D&D workers from unnecessary exposures to contaminated surfaces. This report summarizes the activities performed during FY00 and describes the planned activities for FY01. Accomplishments for FY00 include the following: Development and field-testing of characterization system; Completion of Title III design of deployment platform and decontamination unit; In-house testing of deployment platform and decontamination unit; Completion of system integration design; Identification of deployment site; and Completion of test plan document for deployment of IVOD at Rancho Seco nuclear power facility.

  3. Electric and magnetic field reduction by alternative transmission line options

    SciTech Connect (OSTI)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  4. EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to install an overhead powerline extension from the U.S. Department of Energy's Naval Petroleum Reserve No. 1 (NPR-1) power source to the...

  5. Sensor, method and system of monitoring transmission lines

    DOE Patents [OSTI]

    Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

    2012-10-02

    An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

  6. Effective Methods in Reducing Communication Overheads in Solving

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0/2002 Yun (Helen) He, GHC2002 1 Effective Methods in Reducing Communication Overheads in Solving PDE Problems on Distributed-Memory Computer Architectures Chris Ding and Yun (Helen) He Lawrence Berkeley National Laboratory 10/10/2002 Yun (Helen) He, GHC2002 2 Outline n Introduction n Traditional Method n Ghost Cell Expansion (GCE) Method n GCE Algorithm n Diagonal Communication Elimination (DCE) Technique n Analysis of GCE Method n Message Volume n Communication Time

  7. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  8. Parallel garbage collection without synchronization overhead. Technical report

    SciTech Connect (OSTI)

    Patel, J.H.

    1984-08-01

    Incremental garbage-collection schemes incur substantial overhead that is directly translated as reduced execution efficiency for the user. Parallel garbage-collection schemes implemented via time-slicing on a serial processor also incur this overhead, which might even be aggravated due to context switching. It is useful, therefore, to examine the possibility of implementing a parallel garbage-collection algorithm using a separate processor operating asynchronously with the main-list processor. The overhead in such a scheme arises from the synchronization necessary to manage the two processors, maintaining memory consistency. In this paper, the authors present an architecture and supporting parallel garbage-collection algorithms designed for a virtual memory system with separate processors for list processing and for garbage collection. Each processor has its own primary memory; in addition, there is a small common memory which both processors may access. Individual memories swap off a common secondary memory, but no locking mechanism is required. In particular, a page may reside in both memories simultaneously, and indeed may be accessed and modified freely by each processor. A secondary memory controller ensures consistency without necessitating numerous lockouts on the pages.

  9. Intelligent on-line system for cycle chemistry diagnostics in power plants

    SciTech Connect (OSTI)

    Gallanti, M.; Tomada, L. ); Tarli, R. )

    1990-01-01

    Knowledge base techniques have been exploited for building PROP, a diagnostic system devoted to on-line monitoring and diagnosis of cycle water pollution phenomena in thermal power plants. After a presentation of the motivations that led CISE and ENEL to the development of an expert system for cycle chemistry control, the paper outlines the hardware and software architecture of PROP, and the characteristics of the operator interface. Then the PROP performance in the field test phase and during the first period of operation at the Fusina power plant are presented. In this paper, the authors discuss the general problem of expert system life cycle. Finally the verification and validation approach adopted in the PROP project is described.

  10. Path-sensitive analysis for reducing rollback overheads

    DOE Patents [OSTI]

    O'Brien, John K.P.; Wang, Kai-Ting Amy; Yamashita, Mark; Zhuang, Xiaotong

    2014-07-22

    A mechanism is provided for path-sensitive analysis for reducing rollback overheads. The mechanism receives, in a compiler, program code to be compiled to form compiled code. The mechanism divides the code into basic blocks. The mechanism then determines a restore register set for each of the one or more basic blocks to form one or more restore register sets. The mechanism then stores the one or more register sets such that responsive to a rollback during execution of the compiled code. A rollback routine identifies a restore register set from the one or more restore register sets and restores registers identified in the identified restore register set.

  11. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

  12. Line-focus solar central power system, phase I. Subsystem experiment: receiver heat transfer

    SciTech Connect (OSTI)

    Slemmons, A J

    1980-04-01

    Wind-tunnel tests confirmed that heat losses due to natural convection are negligible in the line-focus, solar-powered receiver. Anomalies in the forced-convection tests prevented definitive conclusions regarding the more important forced convection. Flow-visualization tests using a water table show much lower velocities inside the receiver cavity than outside, supporting the supposition that the forced-heat transfer should be less than that from a standard exposed cylinder. Furthermore, the water-table tests showed ways to decrease the low velocities in the cavity should this be desired. Further wind-tunnel testing should be done to confirm estimates and to support advanced design. This testing can be done in standard wind tunnels since only the forced convection is of concern.

  13. On-line mechanical tube cleaning for steam electric power plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-02-18

    In July 1991, Superior I.D. Tube Cleaners, Inc. (SIDTEC{trademark}) received a grant through the Department of Energy and the Energy Related Invention Program to conduct a long term demonstration of a proprietary technology for on-line mechanical condenser tube cleaning in thermal Power plants on open or once-through cooling water systems where the warmed condenser cooling water is discharged through a canal. The purpose of the demonstration was to confirm and establish the use of this mechanical method as an alternative to the application of chemical biocides in condenser cooling water for the control of biofouling, the growth of micro-organisms which can reduce a unit`s operating efficiency. The SIDTEC on-line mechanical tube cleaner, the Rocket{trademark}, is used to physically remove accumulated deposits on the water side of the main steam condenser, and the non-intrusive tube cleaner recovery system, the Skimmer{trademark}, is used to recover and recirculate tube cleaners. The periodic circulation of tube cleaners can maintain optimum condenser cleanliness and improve unit heat rate. Thermal power plants which discharge condenser cooling water through a canal now have a viable alternative to the chemical treatment of condenser cooling water, whether the principal foulant is biofouling, chemical scaling, silting, or a combination of the three. At prices competitive with scale inhibitors, and a fraction of competing mechanical systems, this technology is provided as a service requiring no capital investment; minimal retrofit modifications to plant structures or equipment; can be installed and maintained without a unit shutdown; does not add any restrictions in the cooling water system; and is environmentally benign.

  14. Mode Initialization for On-line Estimation of Power System Electromechanical Modes

    SciTech Connect (OSTI)

    Zhou, Ning; Trudnowski, Daniel; Pierre, John W.

    2009-03-18

    Measurement-based mode estimation methods are utilized to estimate electromechanical modes of a power system using phasor measurement units (PMU) data. These methods need to extract a certain amount of information before they can give useable mode estimation. Traditionally, the information is gathered solely from measurement data. Priori mode information from other resources (e.g. model eigenvalue analysis, engineering knowledge) are not fully utilized. For real time application, this means that mode estimation takes time to converge. By adding a mode regularization term in the objective function, this paper proposes a mode initialization method to include priori mode information in a regularized robust recursive least squares (R3LS) algorithm for on-line mode estimation. The proposed method is tested using a simple model, a 17 machine model and is shown to be able to shorten the convergence period of the R3LS algorithm. The proposed method is also applied on the measurement data recorded right before a major power outage in the western North American Grid on August 10th 1996 to show its potential applica-tion in detecting an approaching small signal stability problem.

  15. Line-Focus Solar Power Plant Cost Reduction Plan (Milestone Report)

    SciTech Connect (OSTI)

    Kutscher, C.; Mehos, M.; Turchi, C.; Glatzmaier, G.; Moss, T.

    2010-12-01

    Line-focus solar collectors, in particular parabolic trough collectors, are the most mature and proven technology available for producing central electricity from concentrated solar energy. Because this technology has over 25 years of successful operational experience, resulting in a low perceived risk, it is likely that it will continue to be a favorite of investors for some time. The concentrating solar power (CSP) industry is developing parabolic trough projects that will cost billions of dollars, and it is supporting these projects with hundreds of millions of dollars of research and development funding. While this technology offers many advantages over conventional electricity generation -- such as utilizing plentiful domestic renewable fuel and having very low emissions of greenhouse gases and air pollutants -- it provides electricity in the intermediate power market at about twice the cost of its conventional competitor, combined cycle natural gas. The purpose of this document is to define a set of activities from fiscal year 2011 to fiscal year 2016 that will make this technology economically competitive with conventional means.

  16. DOE-HDBK-1141-2001; Radiological Assessor Training, Overheads, Part 3 of 5

    Office of Environmental Management (EM)

    Assessor Training DOE-HDBK-1141-2001 Overheads Office of Environment, Safety & Health U.S. Department of Energy Radiological Assessor Training DOE-HDBK-1141-2001 Overheads ii This page intentionally left blank. OT 1.1 DOE-HDBK-1141-2001 Overhead 1.1 Regulatory Documents Objectives: * Identify the hierarchy of regulatory documents. * Define the purpose of 10 CFR Part 835. * Define the purpose of the DOE Radiological Control Standard. OT 1.2 DOE-HDBK-1141-2001 Overhead 1.2 Regulatory Documents

  17. Developing Effective Continuous On-Line Monitoring Technologies to Manage Service Degradation of Nuclear Power Plants

    SciTech Connect (OSTI)

    Meyer, Ryan M.; Ramuhalli, Pradeep; Bond, Leonard J.; Cumblidge, Stephen E.

    2011-09-30

    Recently, there has been increased interest in using prognostics (i.e, remaining useful life (RUL) prediction) for managing and mitigating aging effects in service-degraded passive nuclear power reactor components. A vital part of this philosophy is the development of tools for detecting and monitoring service-induced degradation. Experience with in-service degradation has shown that rapidly-growing cracks, including several varieties of stress corrosion cracks (SCCs), can grow through a pipe in less than one fuel outage cycle after they initiate. Periodic inspection has limited effectiveness at detecting and managing such degradation requiring a more versatile monitoring philosophy. Acoustic emission testing (AET) and guided wave ultrasonic testing (GUT) are related technologies with potential for on-line monitoring applications. However, harsh operating conditions within NPPs inhibit the widespread implementation of both technologies. For AET, another hurdle is the attenuation of passive degradation signals as they travel though large components, relegating AET to targeted applications. GUT is further hindered by the complexity of GUT signatures limiting its application to the inspection of simple components. The development of sensors that are robust and inexpensive is key to expanding the use of AET and GUT for degradation monitoring in NPPs and improving overall effectiveness. Meanwhile, the effectiveness of AET and GUT in NPPs can be enhanced through thoughtful application of tandem AET-GUT techniques.

  18. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  19. Radiological Assessment for the Removal of Legacy BPA Power Lines that Cross the Hanford Site

    SciTech Connect (OSTI)

    Millsap, William J.; Brush, Daniel J.

    2013-11-13

    This paper discusses some radiological field monitoring and assessment methods used to assess the components of an old electrical power transmission line that ran across the Hanford Site between the production reactors area (100 Area) and the chemical processing area (200 Area). This task was complicated by the presence of radon daughters -- both beta and alpha emitters -- residing on the surfaces, particularly on the surfaces of weathered metals and metals that had been electrically-charged. In many cases, these activities were high compared to the DOE Surface Contamination Guidelines, which were used as guides for the assessment. These methods included the use of the Toulmin model of argument, represented using Toulmin diagrams, to represent the combined force of several strands of evidences, rather than a single measurement of activity, to demonstrate beyond a reasonable doubt that no or very little Hanford activity was present and mixed with the natural activity. A number of forms of evidence were used: the overall chance of Hanford contamination; measurements of removable activity, beta and alpha; 1-minute scaler counts of total surface activity, beta and alpha, using "background makers"; the beta activity to alpha activity ratios; measured contamination on nearby components; NaI gamma spectral measurements to compare uncontaminated and potentially-contaminated spectra, as well as measurements for the sentinel radionuclides, Am- 241 and Cs-137 on conducting wire; comparative statistical analyses; and in-situ measurements of alpha spectra on conducting wire showing that the alpha activity was natural Po-210, as well as to compare uncontaminated and potentially-contaminated spectra.

  20. SunLine Transit Agency Hydrogen-Powered Transit Buses: Third...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report describes operations at SunLine Transit Agency for a protoype fuel cell bus, a prototype hydrogen hybrid interal combustion engine bus, and five new compressed...

  1. Fast-wave Power Flow Along SOL Field Lines In NSTX nd The Associated Power Deposition Profile Across The SOL In Front Of The Antenna

    SciTech Connect (OSTI)

    Perkins, Roy

    2013-06-21

    Fast-wave heating and current drive efficiencies can be reduced by a number of processes in the vicinity of the antenna and in the scrape off layer (SOL). On NSTX from around 25% to more than 60% of the high-harmonic fast-wave power can be lost to the SOL regions, and a large part of this lost power flows along SOL magnetic field lines and is deposited in bright spirals on the divertor floor and ceiling. We show that field-line mapping matches the location of heat deposition on the lower divertor, albeit with a portion of the heat outside of the predictions. The field-line mapping can then be used to partially reconstruct the profile of lost fast-wave power at the midplane in front of the antenna, and the losses peak close to the last closed flux surface (LCFS) as well as the antenna. This profile suggests a radial standing-wave pattern formed by fast-wave propagation in the SOL, and this hypothesis will be tested on NSTX-U. Advanced RF codes must reproduce these results so that such codes can be used to understand this edge loss and to minimize RF heat deposition and erosion in the divertor region on ITER.

  2. DOE-HDBK-1143-2001; Radiological Control Training for Supervisors - Overheads

    Office of Environmental Management (EM)

    Control Training for Supervisors DOE-HDBK-1143-2001 Overheads Office of Environment, Safety & Health U.S. Department of Energy Radiological Control Training for Supervisors DOE-HDBK-1143-2001 Overheads This page intentionally left blank. ii OT 1.1 DOE-HDBK-1143-2001 Overhead 1.1 Regulatory Documents Objectives: * Identify the hierarchy of regulatory documents. * Define the purposes of 10 CFR Parts 820, 830 and 835. * Define the purpose of the DOE Radiological Control Standard. OT 1.2

  3. Investigation of conductor swinging by wind and its application for design of compact transmission line

    SciTech Connect (OSTI)

    Tsujimoto, K.; Fujii, K.; Kubokawa, H.; Okomura, T.; Simojima, K.; Yoshioka, V.

    1982-11-01

    In Japan it has recently become necessary to shorten the interphase spacing in overhead transmission lines because of land limitations and economical considerations. In this connection, the authors have attempted to analyze, in-depth, the possibilities of shortened interphase spacing via conductor swinging caused by wind effects: one of the important factors in the design of more compact overhead lines. This paper describes not only the investigative results of conductor swinging that were obtained both through computer simulation and in 3 years of full scale field line testing, but also design methodology for compact overhead lines based on these results.

  4. SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report (Report and Appendices)

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2008-06-01

    This report describes operations at SunLine Transit Agency for a protoype fuel cell bus, a prototype hydrogen hybrid interal combustion engine bus, and five new compressed natural gas buses.

  5. SunLine Transit Agency Hydrogen-Powered Transit Buses: Third...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report describes operations at SunLine Transit Agency for a protoype fuel cell bus, a prototype hydrogen hybrid interal combustion engine bus, and five new compressed natural ...

  6. Microsoft Word - Broadband Over Power Lines_FINAL.06.01.10.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    has not made significant inroads. By comparison, digital technology and high-power electronics are today employed to varying degrees throughout the transmission system, as...

  7. Wireless Sensor Network for Electric Transmission Line Monitoring

    SciTech Connect (OSTI)

    Alphenaar, Bruce

    2009-06-30

    Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8).

  8. Ecological benefits of dc power transmission

    SciTech Connect (OSTI)

    Kutuzova, N. B.

    2011-05-15

    The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

  9. Electric and magnetic field exposures for people living near a 735-Kilovolt power line

    SciTech Connect (OSTI)

    Levallois, P.; Gauvin, D.; St. Laurent, J.

    1995-09-01

    The purpose of this study was to assess the effect of a 735-kV transmission line on the electric and magnetic field exposures of people living at the edge of the line`s right of way. Exposure of 18 adults, mostly white-collar workers, living in different bungalows located 190-240 feet from the line (exposed subjects) was compared to that of 17 adults living in similar residences far away from any transmission line. Each subject carried a Positron meter for 24 hr during 1 workday, which measured 60-Hz electric and magnetic fields every minute. All measurements were carried out in parallel for exposed and unexposed subjects during the same weeks between September and December. During measurements the average loading on the line varied between 600 and 1100 A. The average magnetic field intensity while at home was 4.4 times higher among exposed subjects than unexposed (7.1 versus 1.6 Mg, p=0.0001) and 6.2 times higher when considering only the sleeping period (6.8 versus 1.1 mG, p=0.0001). Based on the 24-hr measurement, average magnetic field exposure was three times higher among the exposed was positively correlated with the loading on the line (r=0.8, p+0.001). Percentage of time above a magnetic field threshold F(2 mG or 7.8 mG) was a good indicator to distinguish the two types of exposure. Percentage of time above 20 V/m was significantly different, but percentage of time above 78 V/m was rare and comparable for the two groups. Variability of exposure was very low. This study demonstrates that a 735-kV line contributes significantly to residential 60-Hz magnetic field exposure and, to a lesser extent, electric fields for people living at the edge of the right way. Because of the limited size of our sample, caution is recommended before generalizing these results. Nevertheless, due to the uncertainty on the risks associated with such an unusual high residential exposure, research is needed on its possible effects. 30 refs., 1 fig., 7 tabs.

  10. SULFUR REMOVAL FROM PIPE LINE NATURAL GAS FUEL: APPLICATION TO FUEL CELL POWER GENERATION SYSTEMS

    SciTech Connect (OSTI)

    King, David L.; Birnbaum, Jerome C.; Singh, Prabhakar

    2003-11-21

    Pipeline natural gas is being considered as the fuel of choice for utilization in fuel cell-based distributed generation systems because of its abundant supply and the existing supply infrastructure (1). For effective utilization in fuel cells, pipeline gas requires efficient removal of sulfur impurities (naturally occurring sulfur compounds or sulfur bearing odorants) to prevent the electrical performance degradation of the fuel cell system. Sulfur odorants such as thiols and sulfides are added to pipeline natural gas and to LPG to ensure safe handling during transportation and utilization. The odorants allow the detection of minute gas line leaks, thereby minimizing the potential for explosions or fires.

  11. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  12. Power line fault current coupling to nearby natural gas pipelines: Volume 3, Analysis of pipeline coating impedance: Final report

    SciTech Connect (OSTI)

    Dabkowski, J.; Frazier, M. J.

    1988-08-01

    This report is a compilation of results obtained from two research programs. The response of a pipeline and coating at the higher voltage excitation levels encountered under power line fault conditions appears to be dominated by conduction at holiday sites in the coating. A simple analytical model was developed for predicting the resistance of a pipeline coating holiday as a function of the voltage produced across the pipeline coating by a nearby faulted power transmission line. The model was initially validated using coated pipeline samples stressed by a capacitive discharge voltage. Additional validation tests were then performed at the Pacific Gas and Electric Company's High Voltage Engineering Research Facility using high voltage ac waveforms for fault simulation. The principle program objective was to develop, both by laboratory and controlled field testing, an electrical resistance characterization for the pipeline coating as a function of the applied voltage level. The development of this model will allow a more accurate prediction of coupled voltage levels to a pipeline during fault current conditions. 54 figs, 3 tabs.

  13. Testing the Effectiveness of an Avian Flight Diverter for Reducing...

    Open Energy Info (EERE)

    California Abstract Distribution power lines are placed high overhead, safely out of human reach; however, for birds, these overhead wires are a potentially fatal obstacle....

  14. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah

    Broader source: Energy.gov [DOE]

    This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

  15. EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

  16. Characterization Results For The 2013 HTF 3H Evaporator Overhead Samples

    SciTech Connect (OSTI)

    Washington, A. L. II

    2013-12-04

    This report tabulates the radiochemical analysis of the 3H evaporator overhead sample for {sup 137}Cs, {sup 90}Sr, and {sup 129}I to meet the requirements in the Effluent Treatment Project (ETP) Waste Acceptance Criteria (WAC) (rev. 6). This report identifies the sample receipt date, preparation method, and analysis performed in the accumulation of the listed values. All data was found to be within the ETP WAC (rev. 6) specification for the Waste Water Collection Tanks (WWCT).

  17. Performance Evaluation for Modular, Scalable Overhead Cooling Systems In Data Centers

    SciTech Connect (OSTI)

    Xu, TengFang T.

    2009-05-01

    Scientific and enterprise data centers, IT equipment product development, and research data center laboratories typically require continuous cooling to control inlet air temperatures within recommended operating levels for the IT equipment. The consolidation and higher density aggregation of slim computing, storage and networking hardware has resulted in higher power density than what the raised-floor system design, coupled with commonly used computer rack air conditioning (CRAC) units, was originally conceived to handle. Many existing data centers and newly constructed data centers adopt CRAC units, which inherently handle heat transfer within data centers via air as the heat transfer media. This results in energy performance of the ventilation and cooling systems being less than optimal. Understanding the current trends toward higher power density in IT computing, more and more IT equipment manufacturers are designing their equipment to operate in 'conventional' data center environments, while considering provisions of alternative cooling solutions to either their equipment or supplemental cooling in rack or row systems. Naturally, the trend toward higher power density resulting from current and future generations of servers has, in the meanwhile, created significant opportunities for precision cooling suppliers to engineer and manufacture packaged modular and scalable systems. The modular and scalable cooling systems aim at significantly improving efficiency while addressing the thermal challenges, improving reliability, and allowing for future needs and growth. Such pre-engineered and manufactured systems may be a significant improvement over current design; however, without an energy efficiency focus, their applications could also lead to even lower energy efficiencies in the overall data center infrastructure. The overall goal of the project supported by California Energy Commission was to characterize four commercially available, modular cooling systems installed in a data center. Such modular cooling systems are all scalable localized units, and will be evaluated in terms of their operating energy efficiency in a real data center, respectively, as compared to the energy efficiency of traditional legacy data center cooling systems. The technical objective of this project was to evaluate the energy performance of one of the four commercially available modular cooling systems installed in a data center in Sun Microsystems, Inc. This report is the result of a test plan that was developed with the industrial participants' input, including specific design and operating characteristics of the selected modular localized cooling solution provided by vendor 1. The technical evaluation included monitoring and measurement of selected parameters, and establishing and calculating energy efficiency metrics for the selected cooling product, which is a modular, scalable overhead cooling system. The system was tested in a hot/cold aisle environment without separation, or containment or the hot or cold aisles. The scope of this report is to quantify energy performance of the modular cooling unit in operation as it corresponds to a combination of varied server loads and inlet air temperatures. The information generated from this testing when combined with a concurrent research study to document the energy efficiency of the host data center's central chilled water cooling plant can be used to estimate potential energy savings from implementing modular cooling compared to conventional cooling in data centers.

  18. Secretary Chu Thanks Utility Staff and Line Workers For Their Efforts to Restore Power in the Wake of Hurricane Sandy

    Office of Energy Efficiency and Renewable Energy (EERE)

    As utility companies continue to work to restore power outages, Secretary Chu stopped by Pepco yesterday to personally thank the workers for their hard work.

  19. Environmental assessment: Warren Air Force Base 115-kV transmission line, Cheyenne, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Western Area Power Administration (Western), is propsoing to construct a new electrical tranmission line and substation in southeastern Wyoming. This proposed line, called the Warren Air Force Base Tranmission Line, will supply power for Western's system to Francis E.Warren Air Force Base (F.E. Warren AFB) near Cheyenne. It would allow for increased tranmission capacity to the air base. F.E. Warren AFB currently is served electrically be Western via a 13.8-kv line. It is a wood-pole, double-circuit line without an overhead ground wire, which extends from Western's Cheyenne Substation, through an urban area, and onto the air base. The Cheyenne Substation is located on the south side of the city of Cheyenne. The electrical load on the base is increasing from 4 megawatts (MW) to 11 or 12 MW, an approximate three-fold increase. Voltage problems occasionally occur at the base due to the present electrial loads and to the age and inadequacy of the 13.8-kv line, which was placed in service in 1941. The existing line has served beyond its designed service life and requires replacement. Replacement would be necessary even without an increasing load. F.E. Warren AFB has several new and expanding programs, including additional housing, shopping centers, and the Peacekeeper Missile Program. Part of this expansion already has occured; the remainder is expected by early 1988. This expansion has created the need for additional electrical service. The present 13.8-kV line is not capable of supporting the additional load. 28 refs., 4 figs., 2 tabs.

  20. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE PROJECT SUMMARY In February 2011, the Department of Energy issued a $343 million loan guarantee to finance the One Nevada Transmission Line (ON Line) project, a 235-mile, 500 kV AC transmission line capable of carrying 600 MW of power to the grid running

  1. NERI Final Project Report: On-Line Intelligent Self-Diagnostic Monitoring System for Next Generation Nuclear Power Plants

    SciTech Connect (OSTI)

    Bond, Leonard J.; Jarrell, Donald B.; Koehler, Theresa M.; Meador, Richard J.; Sisk, Daniel R.; Hatley, Darrel D.; Watkins, Kenneth S.; Chai, Jangbom; Kim, Wooshik

    2003-06-20

    This project provides a proof-of-principle technology demonstration for SDMS, where a distributed suite of sensors is integrated with active components and passive structures of types expected to be encountered in next generation nuclear power reactor and plant systems. The project employs state-of-the-art operational sensors, advanced stressor-based instrumentation, distributed computing, RF data network modules and signal processing to improve the monitoring and assessment of the power reactor system and gives data that is used to provide prognostics capabilities.

  2. EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of

    Office of Environmental Management (EM)

    Energy 6: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUM MARY This EIS evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver

  3. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113- Jun. 12, 2015

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the “Draft Environmental Impact Statement for the New England Clean Power Link Transmission Line Project” (DOE/EIS-0503) for public review and comment.

  4. Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor

    SciTech Connect (OSTI)

    Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

    1982-11-01

    This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

  5. Means and method for characterizing high power, ultra short laser pulses in a real time, on line manner

    DOE Patents [OSTI]

    Veligdan, James T. (Manorville, NY)

    1994-01-01

    An ultra short (<10 ps), high power laser pulse is temporally characterized by a system that uses a physical measurement of a wavefront that has been altered in a known manner. The system includes a first reflection switch to remove a portion of a pulse from a beam of pulses, then includes a second reflection switch, operating in a mode that is opposite to the first reflection switch, to slice off a portion of that removed portion. The sliced portion is then directed to a measuring device for physical measurement. The two reflection switches are arranged with respect to each other and with respect to the beam of ultra short pulses such that physical measurement of the sliced portion is related to the temporal measurement of the ultra short pulse by a geometric or trigonometric relationship. The reflection switches are operated by a control pulse that is directed to impinge on each of the reflection switches at a 90.degree. angle of incidence.

  6. Demonstration of a Novel Synchrophasor-based Situational Awareness System: Wide Area Power System Visualization, On-line Event Replay and Early Warning of Grid Problems

    SciTech Connect (OSTI)

    Rosso, A.

    2012-12-31

    Since the large North Eastern power system blackout on August 14, 2003, U.S. electric utilities have spent lot of effort on preventing power system cascading outages. Two of the main causes of the August 14, 2003 blackout were inadequate situational awareness and inadequate operator training In addition to the enhancements of the infrastructure of the interconnected power systems, more research and development of advanced power system applications are required for improving the wide-area security monitoring, operation and planning in order to prevent large- scale cascading outages of interconnected power systems. It is critically important for improving the wide-area situation awareness of the operators or operational engineers and regional reliability coordinators of large interconnected systems. With the installation of large number of phasor measurement units (PMU) and the related communication infrastructure, it will be possible to improve the operators’ situation awareness and to quickly identify the sequence of events during a large system disturbance for the post-event analysis using the real-time or historical synchrophasor data. The purpose of this project was to develop and demonstrate a novel synchrophasor-based comprehensive situational awareness system for control centers of power transmission systems. The developed system named WASA (Wide Area Situation Awareness) is intended to improve situational awareness at control centers of the power system operators and regional reliability coordinators. It consists of following main software modules: • Wide-area visualizations of real-time frequency, voltage, and phase angle measurements and their contour displays for security monitoring. • Online detection and location of a major event (location, time, size, and type, such as generator or line outage). • Near-real-time event replay (in seconds) after a major event occurs. • Early warning of potential wide-area stability problems. The system has been deployed and demonstrated at the Tennessee Valley Authority (TVA) and ISO New England system using real-time synchrophasor data from openPDC. Apart from the software product, the outcome of this project consists of a set of technical reports and papers describing the mathematical foundations and computational approaches of different tools and modules, implementation issues and considerations, lessons learned, and the results of lidation processes.

  7. Means and method for characterizing high power, ultra short laser pulses in a real time, on line manner

    DOE Patents [OSTI]

    Veligdan, J.T.

    1994-03-08

    An ultra short (<10 ps), high power laser pulse is temporally characterized by a system that uses a physical measurement of a wavefront that has been altered in a known manner. The system includes a first reflection switch to remove a portion of a pulse from a beam of pulses, then includes a second reflection switch, operating in a mode that is opposite to the first reflection switch, to slice off a portion of that removed portion. The sliced portion is then directed to a measuring device for physical measurement. The two reflection switches are arranged with respect to each other and with respect to the beam of ultra short pulses such that physical measurement of the sliced portion is related to the temporal measurement of the ultra short pulse by a geometric or trigonometric relationship. The reflection switches are operated by a control pulse that is directed to impinge on each of the reflection switches at a 90[degree] angle of incidence. 8 figures.

  8. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  9. Northwest, the Bonneville Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    voltage power lines that move large amounts of power from hydroelectric projects and power plants to urban centers hundreds of miles away. To keep the electricity flowing safely...

  10. Wind Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Power As the accompanying map of New Mexico shows, the best wind power generation potential near WIPP is along the Delaware Mountain ridge line of the southern Guadalupe...

  11. Absolute radiant power measurement for the Au M lines of laser-plasma using a calibrated broadband soft X-ray spectrometer with flat-spectral response

    SciTech Connect (OSTI)

    Troussel, Ph.; Villette, B.; Oudot, G.; Tassin, V.; Bridou, F.; Delmotte, F.; Krumrey, M.

    2014-01-15

    CEA implemented an absolutely calibrated broadband soft X-ray spectrometer called DMX on the Omega laser facility at the Laboratory for Laser Energetics (LLE) in 1999 to measure radiant power and spectral distribution of the radiation of the Au plasma. The DMX spectrometer is composed of 20 channels covering the spectral range from 50 eV to 20 keV. The channels for energies below 1.5 keV combine a mirror and a filter with a coaxial photo-emissive detector. For the channels above 5 keV the photoemissive detector is replaced by a conductive detector. The intermediate energy channels (1.5 keV < photon energy < 5 keV) use only a filter and a coaxial detector. A further improvement of DMX consists in flat-response X-ray channels for a precise absolute measurement of the photon flux in the photon energy range from 0.1 keV to 6 keV. Such channels are equipped with a filter, a Multilayer Mirror (MLM), and a coaxial detector. We present as an example the development of channel for the gold M emission lines in the photon energy range from 2 keV to 4 keV which has been successfully used on the OMEGA laser facility. The results of the radiant power measurements with the new MLM channel and with the usual channel composed of a thin titanium filter and a coaxial detector (without mirror) are compared. All elements of the channel have been calibrated in the laboratory of the Physikalisch-Technische Bundesanstalt, Germany's National Metrology Institute, at the synchrotron radiation facility BESSY II in Berlin using dedicated well established and validated methods.

  12. Dynamic Line Rating: Research and Policy Evaluation

    SciTech Connect (OSTI)

    Jake P. Gentle; Kurt S. Myers; Michael R. West

    2014-07-01

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

  13. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 7, 2012 Southwestern Helps Restore Power After Hurricane Sandy Southwestern Aids Sandy Recovery Line crews from Southwestern repair distribution lines in Tom's River, New ...

  14. Ultra-scale vehicle tracking in low spatial-resolution and low frame-rate overhead video

    SciTech Connect (OSTI)

    Carrano, C J

    2009-05-20

    Overhead persistent surveillance systems are becoming more capable at acquiring wide-field image sequences for long time-spans. The need to exploit this data is becoming ever greater. The ability to track a single vehicle of interest or to track all the observable vehicles, which may number in the thousands, over large, cluttered regions while they persist in the imagery either in real-time or quickly on-demand is very desirable. With this ability we can begin to answer a number of interesting questions such as, what are normal traffic patterns in a particular region or where did that truck come from? There are many challenges associated with processing this type of data, some of which we will address in the paper. Wide-field image sequences are very large with many thousands of pixels on a side and are characterized by lower resolutions (e.g. worse than 0.5 meters/pixel) and lower frame rates (e.g. a few Hz or less). The objects in the scenery can vary in size, density, and contrast with respect to the background. At the same time the background scenery provides a number of clutter sources both man-made and natural. We describe our current implementation of an ultrascale capable multiple-vehicle tracking algorithm for overhead persistent surveillance imagery as well as discuss the tracking and timing performance of the currently implemented algorithm which is aimed at utilizing grayscale electrooptical image sequences alone for the track segment generation.

  15. Microsoft PowerPoint - [5] Le Tang - ABB Presentation at DOE HVDC Workshop

    Office of Environmental Management (EM)

    HVDC Technologies & ABB Experience DOE Workshop - Applications for High-Voltage Direct Current Transmission Technologies Le Tang, ABB , April 22, 2013 In cable > 50 km (>30 miles), most of AC current is needed to charge and discharge In overhead lines > 200 km (>120 miles), most of AC voltage is needed to G G load I C = ωCU 0 U L = ωLI 0 I 0 U 0 I = I 0 - I C U=U 0 -U L Cable Overhead Line C load L Why is DC important in the Transmission Grid ? Capacitance and Inductance of

  16. Aluminum-Alkaline Metal-Metal Composite Conductor - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aluminum wire for high-voltage power transmission with reduced electrical resistance for overhead electrical lines. Description High-voltage electric power transmission...

  17. Aluminum-Alkaline Metal-Metal Composite Conductor - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aluminum wire for high-voltage power transmission with reduced electrical resistance for overhead electrical lines. High-voltage electric power transmission cables based...

  18. Bonneville upgrades lines

    SciTech Connect (OSTI)

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  19. TITLE III EVALUATION REPORT FOR THE SURFACE AND SUBSURFACE POWER SYSTEM

    SciTech Connect (OSTI)

    W.J. REED

    1999-08-16

    The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the alternate constructed power system. Recommendations for resolving discrepancies between the alternate constructed power system, the technical baseline requirements, and the baseline design are included in this report. Cost and schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guidelines. These recommendations are intended to improve and enhance the operation and maintenance of the facility. This Title III Evaluation Report (TER) does not include evaluation of surface electrical construction support facilities used to provide temporary construction power where the intent to remove such facilities when construction is completed such as tent storage buildings, shop buildings, fuel storage area etc. Furthermore, this TER does not include the extension of the existing overhead power lines to the booster pump station that was designed, installed, and is maintained by Nevada Test Site (NTS).

  20. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  1. 2005 clean coal and power conference. Conference proceedings

    SciTech Connect (OSTI)

    2005-07-01

    The theme of the conference was 'The paradox: today's coal technologies versus tomorrow's promise'. The sessions covered: today's technologies, tomorrow's potential; economic stability; energy security; transition to sustainable energy future; new coal power technologies leading to zero emission coal; existing power plants - improved performance through use of new technology; and carbon capture and storage R & D - challenges and opportunities. Some of the papers only consist of the viewgraphs/overheads.

  2. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  3. CONTINUOUS EXTRACTED BEAM IN THE AGS FAST EXTERNAL BEAM LINE.

    SciTech Connect (OSTI)

    GLENN,J.W.; TSOUPAS,N.; BROWN,K.A.; BIRYUKOV,V.M.

    2001-06-18

    A method to split off a few percent of the 6 x 10{sup 13} AGS beam delivered to the Slow External Beam (SEB) lines and send it down the Fast External Beam line (FEB) has been developed. The mission is to feed a counter experiment off the FEB that directly measures the neutrino mass using the muon storage ring. The use of normal thin septum splitters would have an excessive loss overhead and been optically difficult. The AGS Slow Extraction uses a third integer resonance with sextuple strength so the resonance width is a few percent of the beam width. This results in a low density tail which will be clipped by a bent crystal and deflected into the FEB channel. This clipping off of the tail should reduce losses in the SEB transport line. Details of modeled orbits, particle distribution and extraction trajectories into and out off the crystal will be given.

  4. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  5. Reactive power compensating system

    DOE Patents [OSTI]

    Williams, Timothy J. (Redondo Beach, CA); El-Sharkawi, Mohamed A. (Renton, WA); Venkata, Subrahmanyam S. (Seattle, WA)

    1987-01-01

    The reactive power of an induction machine is compensated by providing fixed capacitors on each phase line for the minimum compensation required, sensing the current on one line at the time its voltage crosses zero to determine the actual compensation required for each phase, and selecting switched capacitors on each line to provide the balance of the compensation required.

  6. Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

  7. Reactive Power Compensator.

    DOE Patents [OSTI]

    El-Sharkawi, M.A.; Venkata, S.S.; Chen, M.; Andexler, G.; Huang, T.

    1992-07-28

    A system and method for determining and providing reactive power compensation for an inductive load. A reactive power compensator (50,50') monitors the voltage and current flowing through each of three distribution lines (52a, 52b, 52c), which are supplying three-phase power to one or more inductive loads. Using signals indicative of the current on each of these lines when the voltage waveform on the line crosses zero, the reactive power compensator determines a reactive power compensator capacitance that must be connected to the lines to maintain a desired VAR level, power factor, or line voltage. Alternatively, an operator can manually select a specific capacitance for connection to each line, or the capacitance can be selected based on a time schedule. The reactive power compensator produces control signals, which are coupled through optical fibers (102/106) to a switch driver (110, 110') to select specific compensation capacitors (112) for connections to each line. The switch driver develops triggering signals that are supplied to a plurality of series-connected solid state switches (350), which control charge current in one direction in respect to ground for each compensation capacitor. During each cycle, current flows from ground to charge the capacitors as the voltage on the line begins to go negative from its positive peak value. The triggering signals are applied to gate the solid state switches into a conducting state when the potential on the lines and on the capacitors reaches a negative peak value, thereby minimizing both the potential difference and across the charge current through the switches when they begin to conduct. Any harmonic distortion on the potential and current carried by the lines is filtered out from the current and potential signals used by the reactive power compensator so that it does not affect the determination of the required reactive compensation. 26 figs.

  8. Reactive power compensator

    DOE Patents [OSTI]

    El-Sharkawi, Mohamed A. (Renton, WA); Venkata, Subrahmanyam S. (Woodinville, WA); Chen, Mingliang (Kirkland, WA); Andexler, George (Everett, WA); Huang, Tony (Seattle, WA)

    1992-01-01

    A system and method for determining and providing reactive power compensation for an inductive load. A reactive power compensator (50,50') monitors the voltage and current flowing through each of three distribution lines (52a, 52b, 52c), which are supplying three-phase power to one or more inductive loads. Using signals indicative of the current on each of these lines when the voltage waveform on the line crosses zero, the reactive power compensator determines a reactive power compensator capacitance that must be connected to the lines to maintain a desired VAR level, power factor, or line voltage. Alternatively, an operator can manually select a specific capacitance for connection to each line, or the capacitance can be selected based on a time schedule. The reactive power compensator produces control signals, which are coupled through optical fibers (102/106) to a switch driver (110, 110') to select specific compensation capacitors (112) for connections to each line. The switch driver develops triggering signals that are supplied to a plurality of series-connected solid state switches (350), which control charge current in one direction in respect to ground for each compensation capacitor. During each cycle, current flows from ground to charge the capacitors as the voltage on the line begins to go negative from its positive peak value. The triggering signals are applied to gate the solid state switches into a conducting state when the potential on the lines and on the capacitors reaches a negative peak value, thereby minimizing both the potential difference and across the charge current through the switches when they begin to conduct. Any harmonic distortion on the potential and current carried by the lines is filtered out from the current and potential signals used by the reactive power compensator so that it does not affect the determination of the required reactive compensation.

  9. Financing, Overhead, and Profit: An In-Depth Discussion of Costs Associated with Third-Party Financing of Residential and Commercial Photovoltaic Systems

    SciTech Connect (OSTI)

    Feldman, D.; Friedman, B.; Margolis, R.

    2013-10-01

    Previous work quantifying the non-hardware balance-of-system costs -- or soft costs -- associated with building a residential or commercial photovoltaic (PV) system has left a significant portion unsegmented in an 'other soft costs' category. This report attempts to better quantify the 'other soft costs' by focusing on the financing, overhead, and profit of residential and commercial PV installations for a specific business model. This report presents results from a bottom-up data-collection and analysis of the upfront costs associated with developing, constructing, and arranging third-party-financed residential and commercial PV systems. It quantifies the indirect corporate costs required to install distributed PV systems as well as the transactional costs associated with arranging third-party financing.

  10. Microsoft PowerPoint - [4] HVDC Technology Workshop Arlington April 2013 RevC [Compatibility Mode]

    Office of Environmental Management (EM)

    Neil Kirby Panel Session : State of HVDC Technologies US DOE Grid Tech Applications for High-Voltage Direct Current Transmission Technologies GRID Neil Kirby Arlington, VA April 22 nd , 2013 Agenda * HVDC Technologies * World View * Key Projects * Development Work P 2 HVDC Transmission Back to Back - Asynchronous interconnection of adjacent networks - DC Circuit is short - within the same building/station - 2 Converters in 1 Station Point to Point - Long Distance Transmission by Overhead Line or

  11. APPLICATION OF A CATEGORICAL EXCLUSION

    Office of Environmental Management (EM)

    Electric Power (AEP) for the installation and maintenance of an overhead 7.2kv electrical power line from an existing AEP power pole located on U S Department of Energy...

  12. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  13. Section 1222 Program - Proposed Plains & Eastern Clean Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 Program - Proposed Plains & Eastern Clean Line ... through the Southwestern Power Administration ... NEPA Website, and through other channels of communication. ...

  14. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...

    Energy Savers [EERE]

    Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental...

  15. Proposed Project: Plains & Eastern Clean Line Transmission Line...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 of the Energy Policy Act 2005 Proposed Project: Plains & Eastern Clean Line Transmission Line Proposed Project: Plains & Eastern Clean Line Transmission Line On ...

  16. Plains and Eastern Clean Line Transmission Line: Federal Register...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains and Eastern Clean Line Transmission Line: Federal Register Notice, Volume 80, No. 81 - April 28, 2015 Plains and Eastern Clean Line Transmission Line: Federal Register ...

  17. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  18. Single transmission line data acquisition system

    DOE Patents [OSTI]

    Fasching, George E. (Morgantown, WV)

    1984-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

  19. Pulse power linac

    DOE Patents [OSTI]

    Villa, Francesco (Alameda, CA)

    1990-01-01

    A linear acceleration for charged particles is constructed of a plurality of transmission line sections that extend between a power injection region and an accelerating region. Each line section is constructed of spaced plate-like conductors and is coupled to an accelerating gap located at the accelerating region. Each gap is formed between a pair of apertured electrodes, with all of the electrode apertures being aligned along a particle accelerating path. The accelerating gaps are arranged in series, and at the injection region the line sections are connected in parallel. At the injection region a power pulse is applied simultaneously to all line sections. The line sections are graduated in length so that the pulse reaches the gaps in a coordinated sequence whereby pulse energy is applied to particles as they reach each of the gaps along the accelerating path.

  20. Anonymous Help Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ombuds Program » Anonymous Help Line Ombuds Anonymous Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Anonymous Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns

  1. Plains & Eastern Clean Line HVDC Scheme

    Broader source: Energy.gov (indexed) [DOE]

    Line HVDC Scheme

  2. PowerPoint Presentation

    Broader source: Energy.gov (indexed) [DOE]

    Business Models and Regulation of Regulated Utilities Gregory Starheim, President & CEO Kenergy Corp., Henderson, KY Quadrennial Energy Review September 8, 2014 Public Meeting #12 - East Newark, NJ Kenergy Overview: * Distribution Electric Utility * Serving 56,000 consumers * Strong Industrial base * 2013 Sales: 9,760 M MWh * 7,000 miles of power lines * Regulated by Kentucky PSC * Member-Owner of Big Rivers Electric Corporation (BREC) for power supply services - Total Power Capacity -

  3. Concentrated Solar Power with Thermal Energy Storage Can Help...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Concentrated Solar Power with Thermal Energy Storage Can Help Utilities' Bottom Line, Study Shows December 20, 2012 The storage capacity of concentrating solar power (CSP) can add ...

  4. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Comment submitted on updated Part 2 application. PDF icon ...

  5. SunLine Tests HHICE Bus in Desert Climate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tests HHICE Bus in Desert Climate SunLine Tests HHICE Bus in Desert Climate Fuel Cell Bus Demonstration Projects (Fact Sheet). PDF icon 40107.pdf More Documents & Publications SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report -- Appendices SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report and

  6. Nissan's new in-line DOHC six cylinder engine and its development

    SciTech Connect (OSTI)

    Ishida, Y.; Ito, K.; Kita, Y.; Kadowaki, S.

    1986-01-01

    The new RB20 engine series comprises in-line, 6-cylinder, 2-liter gasoline engines with an all-new design that succeed the L20 engine (1), whose performance has been upgraded numerous times since it was first released 20 years ago. The RB20 engine series includes a single-overhead-cam (SOHC) engine and a double-overhead-cam (DOHC) engine, each of which also has a turbocharged version, making a total of four different engine variations. This range of variations is intended to meet the broad, diversified needs of today's market. The main development theme set for the new engine family was to achieve ''improved performance that would appeal to the senses.'' Thus emphasis was not merely put on obtaining high performance figures, but on making real improvements in engine response and quietness that the driver could actually feel. This paper focuses on two of the four engine variations - the DOHC engine with and without a turbocharger. It discusses the basic engine construction, principal component parts and major development objectives. In the discussion that follows the DOHC engine without a turbocharger is referred to as RB20DE and the turbocharged DOHC engine is referred to as RB20DET.

  7. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWPA Crime Witness Program 918-728-5742 Crime Witness Program Southwestern needs your help. Because much of our electrical transmission lines and equipment is located in secluded, rural areas, we need help protecting it from crimes such as: Shooting at Southwestern's insulators, power lines, transmission towers, or substation equipment Dumping waste or other materials on Southwestern property Vandalizing Southwestern's property, buildings, or vehicles Stealing Southwestern's equipment, supplies,

  8. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  9. Maersk Line Equipment guide

    National Nuclear Security Administration (NNSA)

    Maersk Line Equipment guide We create opportunities in global commerce With approximately 2 million container units of every size and type, Maersk Line has a container to suit your needs. Our fleet of modern Maersk Line containers has an average age of less than six years and a stringent maintenance programme ensures they are always ready for service. Each container in our fleet meets the Convention for Safe Containers (CSC) standards. Size feet / inches Door openings* mm feet / inches Internal

  10. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  11. Plains and Eastern Clean Line Transmission Line: Comment from Chantel |

    Energy Savers [EERE]

    Department of Energy from Chantel Plains and Eastern Clean Line Transmission Line: Comment from Chantel Comment submitted on updated Part 2 application. PDF icon Comment from Chantel 06-09-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Mr. Garrett Plains and Eastern Clean Line Transmission Line: Comment from Ms. Rutherford Plains and Eastern Clean Line Transmission Line: Comment from Ms. Campbell

  12. Plains and Eastern Clean Line Transmission Line: Comment from Marshall

    Energy Savers [EERE]

    Hughes | Department of Energy from Marshall Hughes Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Comment submitted on updated Part 2 application. PDF icon Comment from Marshall Hughes 07-10-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Mr. Dyer Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line Transmission Line: Comment from Patti McCutchen

  13. Southwestern Power Administration Categorical Exclusion Determination...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line Relocation Project for Farrell Cooper Mining Company Program or Field Office: Southwestern Power Administration Location(s) (CityCountyState): Stigler, Haskell County,...

  14. Brawley Power Plant Abandoned | Open Energy Information

    Open Energy Info (EERE)

    Article: Brawley Power Plant Abandoned Abstract NA Authors California Division of Oil, Gas and and Geothermal Resources Published Journal Geothermal Hot Line, 1985 DOI Not...

  15. TGI Solar Power Group | Open Energy Information

    Open Energy Info (EERE)

    Solar Product: TGI Solar Power Group specialises in the manufacture and integration of thin film PV fabrication lines, PV thin film manufacturing equipment, as well as project...

  16. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  17. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  18. Fiber optic sensors for monitoring sodium circuits and power grid cables

    SciTech Connect (OSTI)

    Kasinathan, M.; Sosamma, S.; Pandian, C.; Vijayakumar, V.; Chandramouli, S.; Nashine, B. K.; Rao, C. B.; Murali, N.; Rajan, K. K.; Jayakumar, T.

    2011-07-01

    At Kalpakkam, India, a programme on development of Raman Distributed Temperature sensor (RDTS) for Fast Breeder Reactors (FBR) application is undertaken. Leak detection in sodium circuits of FBR is critical for the safety and performance of the reactors. It is demonstrated that RDTS can be usefully employed in monitoring sodium circuits and in tracking the percolating sodium in case of any leak. Aluminum Conductor Steel Reinforced (ACSR) cable is commonly used as overhead power transmission cable in power grid. A second application demonstrates the suitability of using RDTS to monitor this transmission cable for any defect. (authors)

  19. SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation Report and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices | Department of Energy PDF icon 44646-2.pdf More Documents & Publications SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report -- Appendices SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report -- Appendices

  20. Coherent soliton communication lines

    SciTech Connect (OSTI)

    Yushko, O. V. Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K.

    2014-11-15

    The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

  1. Flow line sampler

    DOE Patents [OSTI]

    Nicholls, Colin I. (San Antonio, TX)

    1992-07-14

    An on-line product sampling apparatus and method for measuring product samples from a product stream (12) in a flow line (14) having a sampling aperture (11), includes a sampling tube (18) for containing product samples removed from flow line (14). A piston (22) removes product samples from the product stream (12) through the sampling aperture (11) and returns samples to product stream (12). A sensor (20) communicates with sample tube (18), and senses physical properties of samples while the samples are within sample tube (18). In one embodiment, sensor (20) comprises a hydrogen transient nuclear magnetic resonance sensor for measuring physical properties of hydrogen molecules.

  2. Microsoft PowerPoint - salishan_05_kogge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 20, 2005 Topics * How We Spend Today's Silicon * Raw Performance & Storage * Factoring in Overheads * Chip Level Architectural Design Space * Explorations Design...

  3. Microsoft PowerPoint - Interface_Levin

    Office of Environmental Management (EM)

    Reduce the number of heavy lifts Plant operations Minimize spent fuel pool overhead crane use Radiation protection and security requirements Cost considerations Additional...

  4. Line Extension Alternatives

    Broader source: Energy.gov [DOE]

    The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the...

  5. Grand Valley Rrl Pwr Line, Inc | Open Energy Information

    Open Energy Info (EERE)

    Valley Rrl Pwr Line, Inc Place: Colorado Website: www.gvp.org Twitter: @GVRuralPower Outage Hotline: 970-242-0040 Outage Map: www.gvp.orgcontentoutage-map References: EIA Form...

  6. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  7. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  8. Microsoft Word - News Release -- Annual Reports now on line 2...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 15 BONNEVILLE POWER ADMINISTRATION Friday, Feb. 20, 2015 CONTACT: Mike Hansen, BPA 503-230-4328 or 503-230-5131 All 77 of BPA's annual reports now on line Portland, Ore. - The...

  9. Power Services A-to-Z Menu (help/navigation)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Navigation Aids "Power Business Line (A to Z)" Menu At the bottom of every Power Services web page you will see a drop-down box called the "Power Services (A to Z)" menu....

  10. SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon 44646-2.pdf More Documents & Publications SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency Fuel Cell Transit ...

  11. EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho Summary The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE's Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA's proposed action is

  12. EIS-0474: Southline Transmission Line Project; Arizona and New Mexico |

    Office of Environmental Management (EM)

    Department of Energy 74: Southline Transmission Line Project; Arizona and New Mexico EIS-0474: Southline Transmission Line Project; Arizona and New Mexico Summary The Bureau of Land Management and Western Area Power Administration are preparing an EIS as joint lead agencies to evaluate the potential environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line

  13. EIS-0499: Great Northern Transmission Line Project, Minnesota | Department

    Office of Environmental Management (EM)

    of Energy 9: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota Summary This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand

  14. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project,

    Office of Environmental Management (EM)

    Montana | Department of Energy 2: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana Summary DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana. EIS-0502: Hot Springs to

  15. CX-005674: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Portland General Electric Overhead Line Crossing of Keeler-Oregon CityCX(s) Applied: B4.9Date: 04/15/2011Location(s): Willamette Meridian, OregonOffice(s): Bonneville Power Administration

  16. Lands & Community

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    essential to distributing electricity to your home or office, they are not designed for human contact. It is extremely dangerous to touch a power line, whether it is overhead or...

  17. CX-012232: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  18. CX-003792: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Replacement of Overhead Ground Wire - Fairview-Rogue Number 1 230-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 09/01/2010Location(s): Curry County, OregonOffice(s): Bonneville Power Administration

  19. CX-008163: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Portland General Electric 13-Kilovolt Overhead Electrical Line Land Use Review Request CX(s) Applied: B4.9 Date: 03/28/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  20. Proposed Project: Plains & Eastern Clean Line Transmission Line |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Transmission Line Proposed Project: Plains & Eastern Clean Line Transmission Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its

  1. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Comment submitted on updated Part 2 application. PDF icon Comment from Dr. Contreras ...

  2. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Marshall Hughes Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Comment submitted on updated Part 2 application. PDF icon Comment from Marshall ...

  3. Plains and Eastern Clean Line Transmission Line: Comment from...

    Broader source: Energy.gov (indexed) [DOE]

    Comment submitted on updated Part 2 application. Comment from Lewis Cain 6-8-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from...

  4. Power marketing and renewable energy

    SciTech Connect (OSTI)

    Fang, J.M.

    1997-09-01

    Power marketing refers to wholesale and retail transactions of electric power made by companies other than public power entities and the regulated utilities that own the generation and distribution lines. The growth in power marketing has been a major development in the electric power industry during the last few years, and power marketers are expected to realize even more market opportunities as electric industry deregulation proceeds from wholesale competition to retail competition. This Topical Issues Brief examines the nature of the power marketing business and its relationship with renewable power. The information presented is based on interviews conducted with nine power marketing companies, which accounted for almost 54% of total power sales by power marketers in 1995. These interviews provided information on various viewpoints of power marketers, their experience with renewables, and their respective outlooks for including renewables in their resource portfolios. Some basic differences exist between wholesale and retail competition that should be recognized when discussing power marketing and renewable power. At the wholesale level, the majority of power marketers stress the commodity nature of electricity. The primary criteria for developing resource portfolios are the same as those of their wholesale customers: the cost and reliability of power supplies. At the retail level, electricity may be viewed as a product that includes value-added characteristics or services determined by customer preferences.

  5. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Energy Savers [EERE]

    No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the...

  6. Western Area Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ <p< ^^i~oeii ^' Western Area Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line

  7. Bonneville Power Administration Midway-Moxee Rebuild

    Energy Savers [EERE]

    Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project Finding of No Significant Impact March 2016 This page left intentionally blank Bonneville Power Administration 1 Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1951 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the

  8. Plains and Eastern Clean Line Transmission Line: Federal Register Notice,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volume 80, No. 81 - April 28, 2015 | Department of Energy Plains and Eastern Clean Line Transmission Line: Federal Register Notice, Volume 80, No. 81 - April 28, 2015 Plains and Eastern Clean Line Transmission Line: Federal Register Notice, Volume 80, No. 81 - April 28, 2015 The Department of Energy (DOE) requests public comment on the first complete application submitted in response to its June 10, 2010 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222

  9. Plains & Eastern Clean Line Transmission Line - Part 2 Application |

    Energy Savers [EERE]

    Department of Energy Transmission Line - Part 2 Application Plains & Eastern Clean Line Transmission Line - Part 2 Application In addition to conducting a NEPA review of the proposed Plains & Eastern Clean Line Transmission Line project, DOE will also conduct due diligence on non-NEPA factors such as the project's technical and financial feasibility and whether the project is in the public interest. DOE will conduct a thorough review that includes making all required statutory

  10. Perovskite Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Perovskite Power 1663 Los Alamos science and technology magazine Latest Issue:October 2015 past issues All Issues submit Perovskite Power A breakthrough in the production of...

  11. Stationary Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & ... Our work in stationary power includes the deployment of clean electricity, which ...

  12. Design of the ILC RTML Extraction Lines

    SciTech Connect (OSTI)

    Seletskiy, S.; Tenenbaum, P.; Walz, D.; Solyak, N.; /Fermilab

    2011-10-17

    The ILC [1] Damping Ring to the Main Linac beamline (RTML) contains three extraction lines (EL). Each EL can be used both for an emergency abort dumping of the beam and tune-up continual train-by-train extraction. Two of the extraction lines are located downstream of the first and second stages of the RTML bunch compressor, and must accept both compressed and uncompressed beam with energy spreads of 2.5% and 0.15%, respectively. In this paper we report on an optics design that allowed minimizing the length of the extraction lines while offsetting the beam dumps from the main line by the distance required for acceptable radiation levels in the service tunnel. The proposed extraction lines can accommodate beams with different energy spreads while at the same time providing the beam size acceptable for the aluminum dump window. The RTML incorporates three extraction lines, which can be used for either an emergency beam abort or for a train-by-train extraction. The first EL is located downstream of the Damping Ring extraction arc. The other two extraction lines are located downstream of each stage of the two-stage bunch compressor. The first extraction line (EL1) receives 5GeV beam with an 0.15% energy spread. The extraction line located downstream of the first stage of bunch compressor (ELBC1) receives both compressed and uncompressed beam, and therefore must accept beam with both 5 and 4.88GeV energy, and 0.15% and 2.5% energy spread, respectively. The extraction line located after the second stage of the bunch compressor (ELBC2) receives 15GeV beam with either 0.15 or 1.8% energy spread. Each of the three extraction lines is equipped with the 220kW aluminum ball dump, which corresponds to the power of the continuously dumped beam with 5GeV energy, i.e., the beam trains must be delivered to the ELBC2 dump at reduced repetition rate.

  13. Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line

    Broader source: Energy.gov [DOE]

    On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

  14. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  15. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  16. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  17. Prepping Power Engineers for the Smart Grid | Department of Energy

    Energy Savers [EERE]

    Prepping Power Engineers for the Smart Grid Prepping Power Engineers for the Smart Grid June 19, 2012 - 4:01pm Addthis This video examines electrostatic induction, a phenomenon that means a conductive object in the vicinity of a power line may have energy coupled to it even if it's not connected to the line. Check out the other videos created by the partnership Bonneville Power Administration, Washington State University and the Northwest Workforce Training Center for Electric Power Engineering

  18. Water Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stationary Power/Energy Conversion Efficiency/Water Power - Water PowerTara Camacho-Lopez2016-02-16T18:27:48+00:00 Enabling a successful water power industry. Hydropower Optimization Developing tools for optimizing the U.S. hydropower fleet's performance with minimal environmental impact. Technology Development Improving the power performance and reliability of marine hydrokinetic technologies. Market Acceleration & Deployment Addressing barriers to development, deployment, and evaluation of

  19. Variable-Width Datapath for On-Chip Network Static Power Reduction

    SciTech Connect (OSTI)

    Michelogiannakis, George; Shalf, John

    2013-11-13

    With the tight power budgets in modern large-scale chips and the unpredictability of application traffic, on-chip network designers are faced with the dilemma of designing for worst- case bandwidth demands and incurring high static power overheads, or designing for an average traffic pattern and risk degrading performance. This paper proposes adaptive bandwidth networks (ABNs) which divide channels and switches into lanes such that the network provides just the bandwidth necessary in each hop. ABNs also activate input virtual channels (VCs) individually and take advantage of drowsy SRAM cells to eliminate false VC activations. In addition, ABNs readily apply to silicon defect tolerance with just the extra cost for detecting faults. For application traffic, ABNs reduce total power consumption by an average of 45percent with comparable performance compared to single-lane power-gated networks, and 33percent compared to multi-network designs.

  20. 2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE

    Gasoline and Diesel Fuel Update (EIA)

    FORM EIA-821 ANNUAL FUEL OIL AND KEROSENE SALES REPORT LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * EXCLUDE: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course *

  1. FTA - SunLine Transit Agency - Final Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    sunline_final_report1.pdf More Documents & Publications Hydrogen Fuel Cell Bus Evaluation: Report for the 2001 Hydrogen Program Review Fuel Cell Transit Buses: ThunderPower Bus Evaluation at SunLine Transit Agency SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results

  2. Power Business Line Decision Forums, as of March 14, 2005

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Implementation - Rate Case 6 Renewable Budget Levels (wo rate credit) PFR PFR 7 Calpine Geothermal PFR Forecast Assumption - Rate Case Actual Implementation Cancellation -...

  3. Subject: BPA: ATADS Discussion - Power Line License Sarah,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Steven Weber mailto: sweber@powline.com Sent: Friday, November 30, 2012 3:23 PM To: Hawkins,Sarah T (BPA) - LC-7 Cc: Brown,Ameliaja L (BPA) - NSSF-4; Hesse,David M (BPA) -...

  4. South Mississippi Electric Power Association (SMEPA) Smart Grid...

    Open Energy Info (EERE)

    Network Targeted Benefits Reduced Meter Reading Costs Improved Electric Service Reliability and Power Quality Reduced Costs from Distribution Line Losses and Theft Reduced...

  5. U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electrical Transmission Line Reconductoring Project Program or Field Office: Southwestern Power Administration ... and prevent electrical outages due to overloading of the ...

  6. HEADLINE: BPA RAISES RATES TO BOLSTER FEDERAL POWER AND TRANSMISSION...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    high-voltage transmission lines that serve Northwest public utilities." For Bonneville's utility power customers, the wholesale rate increase will be an average of 9 percent...

  7. Solar Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Power Project Opportunities Abound in the Region The WIPP site is receives abundant solar energy with 6-7 kWhsq meter power production potential As the accompanying map of ...

  8. SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation Report and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices | Department of Energy This is the fourth evaluation report for this site, and it describes results and experiences from April 2008 through October 2008. PDF icon 44646-1.pdf More Documents & Publications SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report SunLine Transit Agency Hydrogen-Powered Transit Buses: Third Evaluation Report and Appendices SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results

  9. EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |

    Office of Environmental Management (EM)

    Department of Energy 880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary DOE's Western Area Power Administration (Western) is preparing this EA to evaluate the potential environmental impacts of a proposal by Basin Electric Power Cooperative to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line that would connect a new switchyard with the existing Witten

  10. Power supply

    DOE Patents [OSTI]

    Yakymyshyn, Christopher Paul (Seminole, FL); Hamilton, Pamela Jane (Seminole, FL); Brubaker, Michael Allen (Loveland, CO)

    2007-12-04

    A modular, low weight impedance dropping power supply with battery backup is disclosed that can be connected to a high voltage AC source and provide electrical power at a lower voltage. The design can be scaled over a wide range of input voltages and over a wide range of output voltages and delivered power.

  11. The 2mrad Crossing Angle Interaction Region and Extraction Line

    SciTech Connect (OSTI)

    Appleby, R.; U., Manchester; Angal-Kalinin, D.; Dadoun, O.; Bambade, P.; Parker, B.; Keller, L.; Moffeit, K.; Nosochkov, Y.; Seryi, A.; Spencer, C.; Carter, J.; Royal Holloway, U.of London; Napoly, O.; /DAPNIA, Saclay

    2006-07-12

    A complete optics design for the 2mrad crossing angle interaction region and extraction line was presented at Snowmass 2005. Since this time, the design task force has been working on developing and improving the performance of the extraction line. The work has focused on optimizing the final doublet parameters and on reducing the power losses resulting from the disrupted beam transport. In this paper, the most recent status of the 2mrad layout and the corresponding performance are presented.

  12. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Larimer County, Colorado | Department of Energy 83: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado SUMMARY Western Area Power Administration (Western) - with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency - is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade

  13. EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA’s proposed action is to partially fund part the transmission line.

  14. WATER POWER SOLAR POWER WIND POWER

    Broader source: Energy.gov (indexed) [DOE]

    get curren WATER POWER SOLAR POWER WIND POWER Be part of the Clean Energy Generation! YOUR HOUSE BIOMASS ENERGY GEOTHERMAL ENERGY Clean energy can come from the sun. 2 The energy in wind can make electricity. We can make energy with moving water. Bioenergy comes from plants we can turn into fuel. Logs Wood Chips Straw Corn Switchgrass We can use energy from the earth to heat and cool our homes. Check out these cool websites to learn more about clean energy! Energy Information Administration

  15. Laser Seeding Yields High-Power Coherent Terahertz Radiation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    goes into a nonlinear regime where the theory breaks down. Above the MBI threshold (15 mA), the total average CSR power (red) and the power associated with the 1-kHz line...

  16. EPA The Clean Power Plan

    Office of Environmental Management (EM)

    4, 2015 National Tribal Energy Summit Summary 2 Climate change is a threat in the U.S. -- We are already feeling the dangerous and costly effects of a changing climate - affecting people's lives, family budgets, and businesses' bottom lines EPA is taking three actions that will significantly reduce carbon pollution from the power sector, the largest source of carbon pollution in the US o Clean Power Plan (CPP) - existing sources o Carbon Pollution Standards - new, modified and reconstructed

  17. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of insulators damaged by firearms on its high- voltage power line near Joint Base Lewis-McChord in Tacoma, Wash. Damaged insulators can put people nearby at risk of electric...

  18. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hood River Counties, Oregon | Department of Energy 81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon Summary Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville

  19. Energy Department and Federal Efforts to Support Utility Power Restoration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efforts | Department of Energy Federal Efforts to Support Utility Power Restoration Efforts Energy Department and Federal Efforts to Support Utility Power Restoration Efforts October 31, 2012 - 5:19pm Addthis 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of

  20. FNCS: A Framework for Power System and Communication Networks Co-Simulation

    SciTech Connect (OSTI)

    Ciraci, Selim; Daily, Jeffrey A.; Fuller, Jason C.; Fisher, Andrew R.; Marinovici, Laurentiu D.; Agarwal, Khushbu

    2014-04-13

    This paper describes the Fenix framework that uses a federated approach for integrating power grid and communication network simulators. Compared existing approaches, Fenix al- lows co-simulation of both transmission and distribution level power grid simulators with the communication network sim- ulator. To reduce the performance overhead of time synchro- nization, Fenix utilizes optimistic synchronization strategies that make speculative decisions about when the simulators are going to exchange messages. GridLAB-D (a distribution simulator), PowerFlow (a transmission simulator), and ns-3 (a telecommunication simulator) are integrated with the frame- work and are used to illustrate the enhanced performance pro- vided by speculative multi-threading on a smart grid applica- tion. Our speculative multi-threading approach achieved on average 20% improvement over the existing synchronization methods

  1. EA-352 NaturEner Tie Line, LLC | Department of Energy

    Energy Savers [EERE]

    2 NaturEner Tie Line, LLC EA-352 NaturEner Tie Line, LLC Order authorizing NaturEner Tie Line, LLC to export electric energy to Canada PDF icon EA-352 NaturEner Tie Line, LLC More Documents & Publications Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie Line, LLC Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie Line, LLC: Federal Register Notice Volume 74, No. 98 - May 22, 2009 EA-344 Twin Cities Power-Canada, LLC

  2. Southwestern Power Administration Categorical Exclusion Determination Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Erosion Control Project along Transmission Line 3016, Structure 31 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration (Southwestern) proposes to initiate a project to prevent water erosion around transmission line 3016, structure number 31 located in Muskogee County, Oklahoma. The structure foundation is being eroded by water runoff and streambed washout activities

  3. Bipolar pulse forming line

    DOE Patents [OSTI]

    Rhodes, Mark A. (Pleasanton, CA)

    2008-10-21

    A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

  4. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  5. Water Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Power - NearyFig1 Permalink Gallery University of Illinois uses Sandia Labs' reference hydrokinetic turbine to study potential bed erosion effects Energy, Modeling & Analysis, News, Partnership, Renewable Energy, Water Power University of Illinois uses Sandia Labs' reference hydrokinetic turbine to study potential bed erosion effects Sandia Labs Water Power Technologies Department promotes open-source marine hydrokinetic research by disseminating information on MHK technology designs

  6. A reactor core on-line monitoring program - COMP

    SciTech Connect (OSTI)

    Wang, C.; Wu, H.; Cao, L.

    2012-07-01

    A program named COMP is developed for on-line monitoring PWRs' in-core power distribution in this paper. Harmonics expansion method is used in COMP. The Unit 1 reactor of Daya Bay Nuclear Power Plant (Daya Bay NPP) in China is considered for verification. The numerical results show that the maximum relative error between measurement and reconstruction results from COMP is less than 5%, and the computing time is short, indicating that COMP is capable for online monitoring PWRs. (authors)

  7. EA-1849: Department of Energy Loan Guarantee to Ormat Nevada, Inc. for a Geothermal Power Facility in Nevada

    Broader source: Energy.gov [DOE]

    Ormat Nevada Inc. (ORMAT), through its subsidiaries, proposes to construct and operate three geothermal power production facilities and associated power transmission lines in northern Nevada. The...

  8. Power LCAT

    SciTech Connect (OSTI)

    Drennen, Thomas

    2012-08-15

    POWER LCAT is a software tool used to compare elements of efficiency, cost, and environmental effects between different sources of energy.

  9. Power LCAT

    ScienceCinema (OSTI)

    Drennen, Thomas

    2014-06-27

    POWER LCAT is a software tool used to compare elements of efficiency, cost, and environmental effects between different sources of energy.

  10. Water Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water ...

  11. Water Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the industrial development of ocean-energy power-generation knowledge and ... Sandia is developing a fast-running current energy converter (CEC) wake-interaction model. ...

  12. Homeowners: Respond to Power Outages | Department of Energy

    Energy Savers [EERE]

    Power Outages Homeowners: Respond to Power Outages Homeowners: Respond to Power Outages After a disaster, electric utilities and government officials will first work to restore power to critical infrastructure like power plants and transmission lines, water treatment facilities, and telecommunications networks, and also to hospitals, critical care facilities, and emergency response agencies. It may take several days or even weeks to restore power to individual homeowners, but here's what you can

  13. Career Map: Power Systems/Transmission Engineer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems/Transmission Engineer Career Map: Power Systems/Transmission Engineer A stretch of wind turbines and power lines at dusk. Power Systems/Transmission Engineer Position Title Power Systems/Transmission Engineer Alternate Title(s) Electric Power Engineer, Electrical Interconnection Engineer, Electrical Design Engineer Education & Training Level Advanced, Bachelors required, prefer graduate degree Education & Training Level Description Power Systems Engineers typically have a

  14. WINDExchange: What Is Wind Power?

    Wind Powering America (EERE)

    What Is Wind Power? A three-bladed wind turbine with the internal components visible. Six turbines in a row are electrically connected to the power grid. Wind Power Animation This aerial view of a wind turbine plant shows how a group of wind turbines can make electricity for the utility grid. The electricity is sent through transmission and distribution lines to homes, businesses, schools, and so on. View the wind turbine animation to see how a wind turbine works or take a look inside. Wind

  15. NETL LINES OF DEMARCATION 09282012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components, including lines of demarcation between ORD and OIO, will be as follows: 1. Common utility headers including gas compression systems that enter or exit the site will be maintained by the Office of Institutional Operations (OIO). A line of responsibility demarcation between OIO and ORD will be established at the

  16. Top 9 Things You Didn't Know About America's Power Grid | Department...

    Broader source: Energy.gov (indexed) [DOE]

    power plants and transformers connected by more than 450,000 miles of high-voltage transmission lines. The basic process: Electric power is generated at power plants and then...

  17. Emergency pipe line repair connects subsea pipe lines

    SciTech Connect (OSTI)

    Lerique, M.P.; Thiberge, P. ); Wright, N. )

    1990-11-01

    Emergency repair of any subsea line pipe must form a high-integrity, metal-to-metal seal. This paper presents a remote, diverless repair system that utilizes master flanges, a connector and a spool piece to repair line pipe in deep offshore waters.

  18. Power system

    DOE Patents [OSTI]

    Hickam, Christopher Dale (Glasford, IL)

    2008-03-18

    A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

  19. Situ soil sampling probe system with heated transfer line

    DOE Patents [OSTI]

    Robbat, Jr., Albert (Andover, MA)

    2002-01-01

    The present invention is directed both to an improved in situ penetrometer probe and to a heated, flexible transfer line. The line and probe may be implemented together in a penetrometer system in which the transfer line is used to connect the probe to a collector/analyzer at the surface. The probe comprises a heater that controls a temperature of a geologic medium surrounding the probe. At least one carrier gas port and vapor collection port are located on an external side wall of the probe. The carrier gas port provides a carrier gas into the geologic medium, and the collection port captures vapors from the geologic medium for analysis. In the transfer line, a flexible collection line that conveys a collected fluid, i.e., vapor, sample to a collector/analyzer. A flexible carrier gas line conveys a carrier gas to facilitate the collection of the sample. A system heating the collection line is also provided. Preferably the collection line is electrically conductive so that an electrical power source can generate a current through it so that the internal resistance generates heat.

  20. Clean Coal Power Initiative

    SciTech Connect (OSTI)

    Doug Bartlett; Rob James; John McDermott; Neel Parikh; Sanjay Patnaik; Camilla Podowski

    2006-03-31

    This report is the fifth quarterly Technical Progress Report submitted by NeuCo, Incorporated, under Award Identification Number, DE-FC26-04NT41768. This award is part of the Clean Coal Power Initiative (''CCPI''), the ten-year, $2B initiative to demonstrate new clean coal technologies in the field. This report is one of the required reports listed in Attachment B Federal Assistance Reporting Checklist, part of the Cooperative Agreement. The report covers the award period January 1, 2006 - March 31, 2006 and NeuCo's efforts within design, development, and deployment of on-line optimization systems during that period.

  1. Electric Transmission Line Siting Compact

    Office of Environmental Management (EM)

    Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process

  2. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  3. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  4. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energys Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  5. NNSA's Second Line of Defense Program Receives Capability Award |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Second Line of Defense Program Receives Capability Award | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets

  6. Dual power, constant speed electric motor system

    DOE Patents [OSTI]

    Kirschbaum, Herbert S. (Asheville, NC)

    1984-01-01

    A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level.

  7. Dual power, constant speed electric motor system

    DOE Patents [OSTI]

    Kirschbaum, H.S.

    1984-07-31

    A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level. 6 figs.

  8. solar power

    National Nuclear Security Administration (NNSA)

    9%2A en Solar power purchase for DOE laboratories http:nnsa.energy.govmediaroompressreleasessolarpower

  9. Power combiner

    SciTech Connect (OSTI)

    Arnold, Mobius; Ives, Robert Lawrence

    2006-09-05

    A power combiner for the combining of symmetric and asymmetric traveling wave energy comprises a feed waveguide having an input port and a launching port, a reflector for reflecting launched wave energy, and a final waveguide for the collection and transport of launched wave energy. The power combiner has a launching port for symmetrical waves which comprises a cylindrical section coaxial to the feed waveguide, and a launching port for asymmetric waves which comprises a sawtooth rotated about a central axis.

  10. Single transmission line interrogated multiple channel data acquisition system

    DOE Patents [OSTI]

    Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

    1980-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

  11. Undersea line planned to transmit to an island

    SciTech Connect (OSTI)

    Not Available

    1993-08-09

    The electric utility serving Nantucket Island in Massachusetts, which until now has generated its own power, plans to lay 25 miles of transmission cable to connect with New England's mainland grid. The line will allow the utility to purchase less costly power and retire several old generators, improving both reliability and air quality on the island. Nantucket Electric Co. says the 33-Mw submarine link, costing at least $23 million, probably will connect with a line near the elbow on Cape Cod. The undersea cable will be as deep as 60 ft. Nantucket Electric plans to form a partnership within a few months with a mainland utility or private producer that would help finance the project and sell the power. The island utility has preliminary approval by the state Industrial Finance Agency for a tax-exempt bond issue to finance the cable, contingent on its finding a partner.

  12. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  13. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B.

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  14. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, R.B.

    1985-08-15

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  15. SSRL Beam Lines Map | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Beam Lines Map Beam Line by Number | Beam Line by Techniques | Photon Source Parameters

  16. Solar thermal power system

    DOE Patents [OSTI]

    Bennett, Charles L.

    2010-06-15

    A solar thermal power generator includes an inclined elongated boiler tube positioned in the focus of a solar concentrator for generating steam from water. The boiler tube is connected at one end to receive water from a pressure vessel as well as connected at an opposite end to return steam back to the vessel in a fluidic circuit arrangement that stores energy in the form of heated water in the pressure vessel. An expander, condenser, and reservoir are also connected in series to respectively produce work using the steam passed either directly (above a water line in the vessel) or indirectly (below a water line in the vessel) through the pressure vessel, condense the expanded steam, and collect the condensed water. The reservoir also supplies the collected water back to the pressure vessel at the end of a diurnal cycle when the vessel is sufficiently depressurized, so that the system is reset to repeat the cycle the following day. The circuital arrangement of the boiler tube and the pressure vessel operates to dampen flow instabilities in the boiler tube, damp out the effects of solar transients, and provide thermal energy storage which enables time shifting of power generation to better align with the higher demand for energy during peak energy usage periods.

  17. Reduce overhead by using outside services

    SciTech Connect (OSTI)

    Sanchez, R.O.

    1996-09-01

    This document, after giving a summary of Sandia`s mission, describes technology transfer efforts and accomplishments at Sandia. This includes information on their user facilities: the combustion research facility, the national solar thermal test facility, and the electronics quality and reliability center.

  18. Laboratory Measurements of White Dwarf Photospheric Spectral Lines. Hβ

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Falcon, Ross Edward; Sandia National Lab.; Rochau, Gregory A.; Bailey, James E.; Gomez, Thomas; Sandia National Lab.; Montgomery, Michael Houston; Winget, Donald E; Nagayama, Taisuke

    2015-06-18

    We spectroscopically measure multiple hydrogen Balmer line profiles from laboratory plasmas to investigate the theoretical line profiles used in white dwarf (WD) atmosphere models. X-ray radiation produced at the Z Pulsed Power Facility at Sandia National Laboratories initiates plasma formation in a hydrogen-filled gas cell, replicating WD photospheric conditions. We also present time-resolved measurements of Hβ and fit this line using different theoretical line profiles to diagnose electron density, ne, and n = 2 level population, n2. Aided by synthetic tests, we characterize the validity of our diagnostic method for this experimental platform. During a single experiment, we infer amore » continuous range of electron densities increasing from ne ~ 4 to ~30 × 1016 cm-3 throughout a 120-ns evolution of our plasma. Also, we observe n2 to be initially elevated with respect to local thermodynamic equilibrium (LTE); it then equilibrates within ~55 ns to become consistent with LTE. This also supports our electron-temperature determination of Te ~ 1.3 eV (~15,000 K) after this time. At ne≲ 1017 cm-3, we find that computer-simulation-based line-profile calculations provide better fits (lower reduced χ2) than the line profiles currently used in the WD astronomy community. The inferred conditions, however, are in good quantitative agreement. This work establishes an experimental foundation for the future investigation of relative shapes and strengths between different hydrogen Balmer lines.« less

  19. Design Considerations of Fast-cycling Synchrotrons Based on Superconducting Transmission Line Magnets

    SciTech Connect (OSTI)

    Piekarz, H.; Hays, S.; Huang, Y.; Shiltsev, V.; /Fermilab

    2008-06-01

    Fast-cycling synchrotrons are key instruments for accelerator based nuclear and high-energy physics programs. We explore a possibility to construct fast-cycling synchrotrons by using super-ferric, {approx}2 Tesla B-field dipole magnets powered with a superconducting transmission line. We outline both the low temperature (LTS) and the high temperature (HTS) superconductor design options and consider dynamic power losses for an accelerator with operation cycle of 0.5 Hz. We also briefly outline possible power supply system for such accelerator, and discuss the quench protection system for the magnet string powered by a transmission line conductor.

  20. Fin-line horn antenna

    DOE Patents [OSTI]

    Reindel, John (San Diego, CA)

    1990-01-01

    A fin line circuit card containing a fin line slot feeds a dipole antenna ich extends a quarterwave outside the waveguide and provides an energy beam focal point at or near the open end of the waveguide. The dipole antenna thus maintains a wide and nearly constant beamwidth, low VSWR and a circular symmetric radiation pattern for use in electronic warfare direction finding and surveillance applications.

  1. Reliability Estimates for Power Supplies

    SciTech Connect (OSTI)

    Lee C. Cadwallader; Peter I. Petersen

    2005-09-01

    Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

  2. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  3. EIS-0078: Jonesboro-Hergett 161-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

  4. An integrated security framework for GOSS power grid analytics platform

    SciTech Connect (OSTI)

    Gibson, Tara D.; Ciraci, Selim; Sharma, Poorva; Allwardt, Craig H.; Rice, Mark J.; Akyol, Bora A.

    2014-06-23

    In power grid operations, security is an essential component for any middleware platform. Security protects data against unwanted access as well as cyber attacks. GridOpticsTM Software System (GOSS) is an open source power grid analytics platform that facilitates ease of access between applications and data sources and promotes development of advanced analytical applications. GOSS contains an API that abstracts many of the difficulties in connecting to various heterogeneous data sources. A number of applications and data sources have already been implemented to demonstrate functionality and ease of use. A security framework has been implemented which leverages widely accepted, robust JavaTM security tools in a way such that they can be interchanged as needed. This framework supports the complex fine-grained, access control rules identified for the diverse data sources already in GOSS. Performance and reliability are also important considerations in any power grid architecture. An evaluation is done to determine the overhead cost caused by security within GOSS and ensure minimal impact to performance.

  5. Power inverters

    DOE Patents [OSTI]

    Miller, David H. (Redondo Beach, CA); Korich, Mark D. (Chino Hills, CA); Smith, Gregory S. (Woodland Hills, CA)

    2011-11-15

    Power inverters include a frame and a power module. The frame has a sidewall including an opening and defining a fluid passageway. The power module is coupled to the frame over the opening and includes a substrate, die, and an encasement. The substrate includes a first side, a second side, a center, an outer periphery, and an outer edge, and the first side of the substrate comprises a first outer layer including a metal material. The die are positioned in the substrate center and are coupled to the substrate first side. The encasement is molded over the outer periphery on the substrate first side, the substrate second side, and the substrate outer edge and around the die. The encasement, coupled to the substrate, forms a seal with the metal material. The second side of the substrate is positioned to directly contact a fluid flowing through the fluid passageway.

  6. Cleco Power- Power Miser New Home Program

    Broader source: Energy.gov [DOE]

    Louisiana's Cleco Power offers energy efficiency incentives to eligible customers. Cleco Power offers a rate discount for residential customers building homes that meet the Power Miser Program...

  7. Power Flow Controller for Renewables: Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission

    SciTech Connect (OSTI)

    2012-02-08

    GENI Project: MSU is developing a power flow controller to improve the routing of electricity from renewable sources through existing power lines. The fast, innovative, and lightweight circuitry that MSU is incorporating into its controller will eliminate the need for a separate heavy and expensive transformer, as well as the construction of new transmission lines. MSU’s controller is better suited to control power flows from distributed and intermittent wind and solar power systems than traditional transformer-based controllers are, so it will help to integrate more renewable energy into the grid. MSU‘s power flow controller can be installed anywhere in the existing grid to optimize energy transmission and help reduce transmission congestion.

  8. Fusion Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power www.pppl.gov FACT SHEET FUSION POWER Check us out on YouTube. http://www.youtube.com/ppplab Find us on Facebook. http://www.facebook.com/PPPLab Follow us on Twitter. @PPPLab Access our RSS feed @PPPLab Deuterium Electron Proton Hydrogen Tritium Neutron For centuries, the way in which the sun and stars produce their energy remained a mystery to man. During the twentieth century, scientists discovered that they produce their energy by the fusion process. E=mc 2 , Albert Einstein's familiar

  9. Letter from Deputy Secretary Poneman to Clean Line Energy Regarding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Line: Comment from Ms. Schroeder Plains and Eastern Clean Line Transmission Line: Comment from Mr. Zuniga Plains and Eastern Clean Line Transmission Line: Comment from Mr. Cain...

  10. Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. |

    Energy Savers [EERE]

    Department of Energy Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. March 10, 2009 - 6:00am Addthis John Lippert Power supplies convert the AC power that you get from your electric company into the DC power consumed by most electronics, including your computer. We expect our power supplies to be safe, reliable, and durable. If they meet those criteria, then they're all alike, except for cost,

  11. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Polson, Montana | Department of Energy 1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project

  12. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oregon | Department of Energy 967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon. The project

  13. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County,

    Office of Environmental Management (EM)

    Oregon | Department of Energy 52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon. Additional information is available at the project website:

  14. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and

    Office of Environmental Management (EM)

    Polson, Montana | Department of Energy 1: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and Polson, Montana SUMMARY Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. The proposed action is to replace wood-pole

  15. EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild;

    Office of Environmental Management (EM)

    Pinal County, Arizona | Department of Energy 2: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild; Pinal County, Arizona EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild; Pinal County, Arizona SUMMARY Western Area Power Administration prepared an EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional

  16. EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

  17. EIS-0308: Southpoint Power Plant Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EIS analyzes the U.S. Department of the Interior Bureau of Indian Affairs proposed lease of acreage on the Fort Mojave Indian Reservation in Mohave County, Arizona for development of a natural gas-fired 500 megawatt combined cycle power plant. DOE's Western Area Power Administration (WAPA) is a cooperating agency, and the plant would supply power to the WAPA grid. The proposed Southpoint power plant would require construction of an off-site substation and two 230 kV transmission lines in order to wheel power to WAPAs distribution grid. An Environmental Assessment (EA) for the proposed substation and transmission line was prepared with the Department of the Interior Bureau of Land Management as lead agency and WAPA as a cooperating agency, and a Finding of No Significant Impact was approved on December 2, 1997.

  18. Environmental assessment

    SciTech Connect (OSTI)

    NONE

    1995-08-01

    The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties, New Mexico) will supply additional electric power to the Waste Isolation Pilot Plant (WIPP) and involve construction of a new electric substation at WIPP. This would provide a redundant electrical power source to WIPP. A finding of no significant impact is made.

  19. Cast-stone sectors for lining bends in pipework

    SciTech Connect (OSTI)

    Chechulin, V.A.; Novikov, A.I.; Karpov, V.M.; Sotnik, A.A.; Sedyshev, B.L.

    1987-03-01

    The authors disclose an efficient method for lining the bends of pipelines used to deliver coal dust to the burners of coal-fired power plants or to transport coal slurries in mining and preparation enterprises. The method consists of melting a wear-resistant silicate compound and casting it in the form of rings whose increased width on the outboard side accounts for the angle of the bend when the rings are installed consecutively inside the pipe. Enhanced service life estimations and cost benefit analyses are given for pipe bends thus lined in both of the above applications.

  20. Star Power

    ScienceCinema (OSTI)

    None

    2014-11-18

    The U.S. Department of Energy's Princeton Plasma Physics Laboratory has released ''Star Power,'' a new informational video that uses dramatic and beautiful images and thought-provoking interviews to highlight the importance of the Laboratory's research into magnetic fusion.

  1. Star Power

    SciTech Connect (OSTI)

    2014-10-17

    The U.S. Department of Energy's Princeton Plasma Physics Laboratory has released ''Star Power,'' a new informational video that uses dramatic and beautiful images and thought-provoking interviews to highlight the importance of the Laboratory's research into magnetic fusion.

  2. GEOTHERMAL POWER GENERATION PLANT

    SciTech Connect (OSTI)

    Boyd, Tonya

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196oF resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  3. Powerful glow discharge excilamp

    DOE Patents [OSTI]

    Tarasenko, Victor F.; Panchenko, Aleksey N.; Skakun, Victor S.; Sosnin, Edward A.; Wang, Francis T.; Myers, Booth R.; Adamson, Martyn G.

    2002-01-01

    A powerful glow discharge lamp comprising two coaxial tubes, the outer tube being optically transparent, with a cathode and anode placed at opposite ends of the tubes, the space between the tubes being filled with working gas. The electrodes are made as cylindrical tumblers placed in line to one other in such a way that one end of the cathode is inserted into the inner tube, one end of the anode coaxially covers the end of the outer tube, the inner tube penetrating and extending through the anode. The increased electrodes' surface area increases glow discharge electron current and, correspondingly, average radiation power of discharge plasma. The inner tube contains at least one cooling liquid tube placed along the axis of the inner tube along the entire lamp length to provide cathode cooling. The anode has a circumferential heat extracting radiator which removes heat from the anode. The invention is related to lighting engineering and can be applied for realization of photostimulated processes under the action of powerful radiation in required spectral range.

  4. Type A Accident Investigation Report – Western Area Power Administration Investigation of the June 7, 2004, Construction Contractor Electrical Accident at Double-Circuit Structure 38/1, Watertown-Granite Falls 230-kV Transmission Line East of Watertown, S

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type A Accident Investigation board appointed by Timothy J. Meeks, Chief Operating Officer, Western Area Power Administration.

  5. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONE NEVADA LINE ONE NEVADA LINE PDF icon DOE-LPO_Project-Posters_STOR-TRSM_One-Nevada-Line.pdf More Documents & Publications STEPHENTOWN SPINDLE CX-011989: Categorical Exclusion Determination CRESCENT DUNES

  6. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P. (Cambridge, GB)

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  7. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-06-10

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  8. Contingency Analysis of Cascading Line Outage Events

    SciTech Connect (OSTI)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  9. Plains and Eastern Clean Line Transmission Line: Comment from Block Plains

    Energy Savers [EERE]

    and Eastern Clean Line: Arkansas and Oklahoma | Department of Energy from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Comment submitted on updated Part 2 application. PDF icon Comment from Block Plains & Eastern Clean Line Arkansas and Oklahoma 06-08-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from

  10. Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras

    Energy Savers [EERE]

    | Department of Energy from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Comment submitted on updated Part 2 application. PDF icon Comment from Dr. Contreras 6-10-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras

  11. Plains and Eastern Clean Line Transmission Line: Comment from Ms. Callahan

    Energy Savers [EERE]

    | Department of Energy Ms. Callahan Plains and Eastern Clean Line Transmission Line: Comment from Ms. Callahan Comment submitted on updated Part 2 application. PDF icon Comment from Ms. Callahan 07-13-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Cynthia Blansett (COE) Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Simon Mahan (SWEA)

  12. Note: Characteristic beam parameter for the line electron gun

    SciTech Connect (OSTI)

    Iqbal, M.; Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049 ; Islam, G. U.; Zhou, Z.; Chi, Y.

    2013-11-15

    We have optimized the beam parameters of line source electron gun using Stanford Linear Accelerator Centre electron beam trajectory program (EGUN), utilizing electrostatic focusing only. We measured minimum beam diameter as 0.5 mm that corresponds to power density of 68.9 kW/cm{sup 2} at 13.5 mm in the post-anode region which is more than two-fold (33 kW/cm{sup 2}), of the previously reported results. The gun was operated for the validation of the theoretical results and found in good agreement. The gun is now without any magnetic and electrostatic focusing thus much simpler and more powerful.

  13. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox (Columbia, MO)

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  14. User Experiment Time-Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Experiment Time-Line Event Target Call for proposal 2 months before proposals are due PAC Proposals Due 7 weeks before PAC meeting TAC Report for PAC Proposals (includes Independent Technical Review) 4 weeks after proposals are due PAC Report Published 1-2 months after PAC

  15. Angular output of hollow, metal-lined, waveguide Raman sensors

    SciTech Connect (OSTI)

    Biedrzycki, Stephen; Buric, Michael P.; Falk, Joel; Woodruff, Steven D.

    2012-04-20

    Hollow, metal-lined waveguides used as gas sensors based on spontaneous Raman scattering are capable of large angular collection. The collection of light from a large solid angle implies the collection of a large number of waveguide modes. An accurate estimation of the propagation losses for these modes is required to predict the total collected Raman power. We report a theory/experimental comparison of the Raman power collected as a function of the solid angle and waveguide length. New theoretical observations are compared with previous theory appropriate only for low-order modes. A cutback experiment is demonstrated to verify the validity of either theory. The angular distribution of Raman light is measured using aluminum and silver-lined waveguides of varying lengths.

  16. Plains and Eastern Clean Line Transmission Line: Comment from Downwind, LLC

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy Downwind, LLC 6-11-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Downwind, LLC Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line Transmission Line: Comment from Crystal Yarbrough

  17. Plains and Eastern Clean Line Transmission Line: Comment from Mr. Eubanks

    Broader source: Energy.gov (indexed) [DOE]

    (OAG) | Department of Energy OAG 07-13-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Mr. Dyer Plains and Eastern Clean Line Transmission Line: Comment from Downwind, LLC Plains and Eastern Clean Line Transmission Line: Comment from Ms. Alinda Baker

  18. Plains and Eastern Clean Line Transmission Line: Comment from Mr. Zuniga |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Juan Zuniga 6-9-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Change.org Plains and Eastern Clean Line Transmission Line: Comment from Mr. Leftwich Plains and Eastern Clean Line Transmission Line: Comment from Leslie Mahoney

  19. Plains and Eastern Clean Line Transmission Line: Comment from Ms. Schroeder

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy Schroeder 6-08-15.pdf More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Ms. Shaw Plains and Eastern Clean Line Transmission Line: Comment from Mr. Burningham Plains and Eastern Clean Line Transmission Line: Comment from Fallon Sanford

  20. second line of defense | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    second line of defense | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at

  1. Waste Heat Powered Ammonia Absorption Refrigeration Unit for LPG Recovery

    SciTech Connect (OSTI)

    Donald C, Energy Concepts Co.; Lauber, Eric, Western Refining Co.

    2008-06-20

    An emerging DOE-sponsored technology has been deployed. The technology recovers light ends from a catalytic reformer plant using waste heat powered ammonia absorption refrigeration. It is deployed at the 17,000 bpd Bloomfield, New Mexico refinery of Western Refining Company. The technology recovers approximately 50,000 barrels per year of liquefied petroleum gas that was formerly being flared. The elimination of the flare also reduces CO2 emissions by 17,000 tons per year, plus tons per year reductions in NOx, CO, and VOCs. The waste heat is supplied directly to the absorption unit from the Unifiner effluent. The added cooling of that stream relieves a bottleneck formerly present due to restricted availability of cooling water. The 350oF Unifiner effluent is cooled to 260oF. The catalytic reformer vent gas is directly chilled to minus 25oF, and the FCC column overhead reflux is chilled by 25oF glycol. Notwithstanding a substantial cost overrun and schedule slippage, this project can now be considered a success: it is both profitable and highly beneficial to the environment. The capabilities of directly-integrated waste-heat powered ammonia absorption refrigeration and their benefits to the refining industry have been demonstrated.

  2. NREL: Water Power Research - Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grid Integration High-voltage transmission lines and towers silouetted against a blue sky with the first glow of the rising sun on the horizon behind them. The national need for transmission improvements will have a direct impact on the effective use of renewable energy sources. For marine and hydrokinetic technologies to play a larger role in supplying the nation's energy needs, integration into the U.S. power grid is an important challenge to address. Efficient integration of variable power

  3. Categorical Exclusion Determinations: Western Area Power

    Office of Environmental Management (EM)

    Administration-Desert Southwest Region | Department of Energy Desert Southwest Region Categorical Exclusion Determinations: Western Area Power Administration-Desert Southwest Region Categorical Exclusion Determinations issued by Western Area Power Administration-Desert Southwest Region. DOCUMENTS AVAILABLE FOR DOWNLOAD September 11, 2014 CX-012090: Categorical Exclusion Determination Henderson-Mead Number 2 230-Kilovolt Transmission Line, Erosion Repair at Structure 2/4 CX(s) Applied: B1.3

  4. Categorical Exclusion Determinations: Western Area Power

    Office of Environmental Management (EM)

    Administration-Sierra Nevada Region | Department of Energy Sierra Nevada Region Categorical Exclusion Determinations: Western Area Power Administration-Sierra Nevada Region Categorical Exclusion Determinations issued by Western Area Power Administration-Sierra Nevada Region. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2014 CX-012784: Categorical Exclusion Determination 2014 Access Road Erosion Repair Along the Path 15 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 41831

  5. PowerPoint Presentation

    Broader source: Energy.gov (indexed) [DOE]

    lines to supply an area, if the lines exist + can hold additional capacity * Lack of storage * Natural gas expandscontracts, which means it can be stored or liquefied for...

  6. In-line thermoelectric module

    DOE Patents [OSTI]

    Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

    2000-01-01

    A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

  7. Radiological Worker Training Power Point Slides for App. A

    Energy Savers [EERE]

    30-2008 DOE HANDBOOK Radiological Worker Training DOE-HDBK-1130-2008 Overheads December 2008 Reaffirmed 2013 OT 1.1 DOE-HDBK-1130-2008 Overhead 1.1 Regulatory Documents Objectives: * Identify the hierarchy of regulatory documents. * Define the purposes of 10 CFR Parts 820, 830 and 835. * Define the purpose of the DOE Radiological Control Standard. OT 1.2 DOE-HDBK-1130-2008 Overhead 1.2 Regulatory Documents (cont.) Objectives: * Define the terms "shall" and "should" as used in

  8. HIGH-n HYDROGEN RECOMBINATION LINES FROM THE FIRST GALAXIES

    SciTech Connect (OSTI)

    Rule, E.; Loeb, A.; Strelnitski, V. S.

    2013-09-20

    We investigate the prospects of blind and targeted searches in the radio domain (10 MHz to 1 THz) for high-n hydrogen recombination lines from the first generation of galaxies, at z ?< 10. The expected optically thin spontaneous ?-line luminosities are calculated as a function of the absolute AB magnitude of a galaxy at 1500 . For a blind search, semi-empirical luminosity functions are used to calculate the number of galaxies whose expected flux densities exceed an assumed detectability threshold. Plots of the minimum sky area, within which at least one detectable galaxy is expected at a given observing frequency, in the fiducial instantaneous passband of 10{sup 4} km s{sup 1}, allow us to assess the blind search time necessary for detection by a given facility. We show that the chances for detection are the highest in the millimeter and submillimeter domains, but finding spontaneous emission in a blind search, especially from redshifts z >> 1, is a challenge even with powerful facilities, such as the Actama Large Millimeter/Submillimeter Array and Square Kilometre Array. The probability of success is higher for a targeted search of lines with principal quantum number n ? 10 in Lyman-break galaxies amplified by gravitational lensing. Detection of more than one hydrogen line in such a galaxy will allow for line identification and a precise determination of the galaxy's redshift.

  9. Stanton County Public Power District Smart Grid Project | Open...

    Open Energy Info (EERE)

    The project extends smart meter coverage from 453 to 2,768 meters and uses existing radio frequency and power-line-carrier communications networks for data collection.3...

  10. Power oscillator

    DOE Patents [OSTI]

    Gitsevich, Aleksandr

    2001-01-01

    An oscillator includes an amplifier having an input and an output, and an impedance transformation network connected between the input of the amplifier and the output of the amplifier, wherein the impedance transformation network is configured to provide suitable positive feedback from the output of the amplifier to the input of the amplifier to initiate and sustain an oscillating condition, and wherein the impedance transformation network is configured to protect the input of the amplifier from a destructive feedback signal. One example of the oscillator is a single active element device capable of providing over 70 watts of power at over 70% efficiency. Various control circuits may be employed to match the driving frequency of the oscillator to a plurality of tuning states of the lamp.

  11. Laboratory Measurements of White Dwarf Photospheric Spectral Lines. H?

    SciTech Connect (OSTI)

    Falcon, Ross Edward; Rochau, Gregory A.; Bailey, James E.; Gomez, Thomas; Montgomery, Michael Houston; Winget, Donald E; Nagayama, Taisuke

    2015-06-18

    We spectroscopically measure multiple hydrogen Balmer line profiles from laboratory plasmas to investigate the theoretical line profiles used in white dwarf (WD) atmosphere models. X-ray radiation produced at the Z Pulsed Power Facility at Sandia National Laboratories initiates plasma formation in a hydrogen-filled gas cell, replicating WD photospheric conditions. We also present time-resolved measurements of H? and fit this line using different theoretical line profiles to diagnose electron density, ne, and n = 2 level population, n2. Aided by synthetic tests, we characterize the validity of our diagnostic method for this experimental platform. During a single experiment, we infer a continuous range of electron densities increasing from ne ~ 4 to ~30 1016 cm-3 throughout a 120-ns evolution of our plasma. Also, we observe n2 to be initially elevated with respect to local thermodynamic equilibrium (LTE); it then equilibrates within ~55 ns to become consistent with LTE. This also supports our electron-temperature determination of Te ~ 1.3 eV (~15,000 K) after this time. At ne? 1017 cm-3, we find that computer-simulation-based line-profile calculations provide better fits (lower reduced ?2) than the line profiles currently used in the WD astronomy community. The inferred conditions, however, are in good quantitative agreement. This work establishes an experimental foundation for the future investigation of relative shapes and strengths between different hydrogen Balmer lines.

  12. Power management system

    DOE Patents [OSTI]

    Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

    2007-10-02

    A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

  13. Powering | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization and Reliability Protect the Power Grid Using the power of software, machine learning, power systems, and other advanced analytics as well as next-generation design......

  14. U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Short Mountain Transmission Line Access Road Easement Acquisition Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Short Mountain, Leflore County, Oklahoma Proposed Action Description: Southwestern Power Administration proposes to obtain an easement to access a portion of transmission line located on Short Mountain in Leflore County, Oklahoma. Categorical Exclusion(s) Applied: l 0 CFR 102 l, Appendix B to Subpart D, Part B 1.24- Transfer, lease,

  15. Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

    SciTech Connect (OSTI)

    Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

    2013-05-04

    Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

  16. Using powerful computers, physicists uncover mechanism that stabilizes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plasma within tokamaks | Princeton Plasma Physics Lab Using powerful computers, physicists uncover mechanism that stabilizes plasma within tokamaks By Raphael Rosen November 17, 2015 Tweet Widget Google Plus One Share on Facebook A cross-section of the virtual plasma showing where the magnetic field lines intersect the plane. The central section has field lines that rotate exactly once. (Photo by Stephen Jardin) A cross-section of the virtual plasma showing where the magnetic field lines

  17. Using powerful computers, physicists uncover mechanism that stabilizes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plasma within tokamaks | Princeton Plasma Physics Lab Using powerful computers, physicists uncover mechanism that stabilizes plasma within tokamaks By Raphael Rosen November 17, 2015 Tweet Widget Google Plus One Share on Facebook A cross-section of the virtual plasma showing where the magnetic field lines intersect the plane. The central section has field lines that rotate exactly once. (Photo by Stephen Jardin) A cross-section of the virtual plasma showing where the magnetic field lines

  18. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 78 existing substations.

  19. CX-010406: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Davis Dam to Kingman Tap 69 Kilovolt Transmission Line, Overhead Optical Power Ground Wire Installation CX(s) Applied: B4.7 Date: 05/16/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  20. Overhead Piping / Asbestos Removal. Letter transmits response to comments on the overhead piping and asbestos removal.

    Office of Legacy Management (LM)

  1. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  2. FMC high power density electric drive technology

    SciTech Connect (OSTI)

    Shafer, G.A.

    1994-12-31

    FMC has developed a unique capability in energy-efficient, high-performance AC induction electric drive systems for electric and hybrid vehicles. These drives will not only be important to future military ground combat vehicles, but will also provide significant competitive advantages to industrial and commercial machinery and vehicles. The product line under development includes drive motors and associated power converters directed at three power/vehicle weight classes. These drive systems cover a broad spectrum of potential vehicle applications, ranging from light pickup trucks to full-size transit buses. The drive motors and power converters are described.

  3. WINDExchange: Buying Wind Power

    Wind Powering America (EERE)

    Buying Wind Power Individuals, communities, businesses, and government entities may decide that buying wind power to supply their energy needs is the right fit. There are several ways to purchase wind power. Green Power Marketing Green power marketing refers to green power being offered by multiple suppliers in a competitive marketplace. In states that have established retail competition, customers may be able to purchase green power from a competitive supplier. Learn more about green power

  4. X-ray line polarization spectroscopy of Li-like satellite line...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: X-ray line polarization spectroscopy of Li-like satellite line spectra Citation Details In-Document Search Title: X-ray line polarization spectroscopy of Li-like...

  5. Plains and Eastern Clean Line Transmission Line: Comment from Save The

    Energy Savers [EERE]

    Ozarks | Department of Energy Save The Ozarks Plains and Eastern Clean Line Transmission Line: Comment from Save The Ozarks Comment submitted on updated Part 2 application. PDF icon Comment by Save the Ozarks 07-13-15.pdf More Documents & Publications Plains & Eastern Clean Line Transmission Line - Part 2 Application Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains and Eastern

  6. CXD 4601, Line Yard Fence Project (4601)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line Yard Fence Project (4601) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to install fencing around the Old Line Yard to provide protected...

  7. Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization

    DOE Patents [OSTI]

    Jankowiak, R.J.; Small, G.J.; Shields, P.A.

    1999-04-27

    Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes. 21 figs.

  8. Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization

    DOE Patents [OSTI]

    Jankowiak, Ryszard J. (Ames, IA); Small, Gerald J. (Ames, IA); Shields, Peter A. (Reading, MA)

    1999-04-27

    Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes.

  9. O.A.R. 734-055 - Pole Lines, Buried Cables, Pipe lines, Signs...

    Open Energy Info (EERE)

    rules outline the requirements for location, installation, construction, maintenance and use of pole lines, buried cables, pipe lines, signs miscellaneous operations...

  10. Patent: In-line stirling energy system | DOEpatents

    Office of Scientific and Technical Information (OSTI)

    In-line stirling energy system Citation Details Title: In-line stirling energy system

  11. U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line 3007 Structure Replacement Project for Flood Prone Areas Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Rural Jackson and Craighead Counties, Arkansas SWPA F 450.4 (Rev. 05/14) Proposed Action Description: Southwestern Power Administration proposes to replace electrical transmission line structure numbers 496-497, 519-522, and 562-569 along Line 3007. Categorical Exclusion(s) Applied: IO CFR I 021, Appendix B to Subpart D, Part 84.6. Additions

  12. MMW Drilling & Lining | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MMW Drilling & Lining MMW Drilling & Lining MMW Drilling & Lining presentation at the April 2013 peer review meeting held in Denver, Colorado. PDF icon mmw_drilling_peer2013.pdf More Documents & Publications Auto Indexer for Percussive Hammers CX-007410: Categorical Exclusion Determination Microhole Arrays / FLASH

  13. Spitzer mid-IR spectroscopy of powerful 2Jy and 3CRR radio galaxies. II. AGN power indicators and unification

    SciTech Connect (OSTI)

    Dicken, D.; Tadhunter, C.; Morganti, R.; Axon, D.; Robinson, A.; Magagnoli, M.; Kharb, P.; Ramos Almeida, C.; Hardcastle, M.; Nesvadba, N. P. H.; Singh, V.; Kouwenhoven, M. B. N.; Rose, M.; Spoon, H.; Inskip, K. J.; Holt, J.

    2014-06-20

    It remains uncertain which continuum and emission line diagnostics best indicate the bolometric powers of active galactic nuclei (AGNs), especially given the attenuation caused by the circumnuclear material and the possible contamination by components related to star formation. Here we use mid-IR spectra along with multiwavelength data to investigate the merit of various diagnostics of AGN radiative power, including the mid-IR [Ne III] ?25.89 ?m and [O IV] ?25.89 ?m fine-structure lines, the optical [O III] ?5007 forbidden line, and mid-IR 24 ?m, 5 GHz radio, and X-ray continuum emission, for complete samples of 46 2Jy radio galaxies (0.05 < z < 0.7) and 17 3CRR FRII radio galaxies (z < 0.1). We find that the mid-IR [O IV] line is the most reliable indicator of AGN power for powerful radio-loud AGNs. By assuming that the [O IV] is emitted isotropically, and comparing the [O III] and 24 ?m luminosities of the broad- and narrow-line AGNs in our samples at fixed [O IV] luminosity, we show that the [O III] and 24 ?m emission are both mildly attenuated in the narrow-line compared to the broad-line objects by a factor of ?2. However, despite this attenuation, the [O III] and 24 ?m luminosities are better AGN power indicators for our sample than either the 5 GHz radio or the X-ray continuum luminosities. We also detect the mid-IR 9.7 ?m silicate feature in the spectra of many objects but not ubiquitously: at least 40% of the sample shows no clear evidence for these features. We conclude that, for the majority of powerful radio galaxies, the mid-IR lines are powered by AGN photoionization.

  14. Wind Power Plant Voltage Stability Evaluation: Preprint

    SciTech Connect (OSTI)

    Muljadi, E.; Zhang, Y. C.

    2014-09-01

    Voltage stability refers to the ability of a power system to maintain steady voltages at all buses in the system after being subjected to a disturbance from a given initial operating condition. Voltage stability depends on a power system's ability to maintain and/or restore equilibrium between load demand and supply. Instability that may result occurs in the form of a progressive fall or rise of voltages of some buses. Possible outcomes of voltage instability are the loss of load in an area or tripped transmission lines and other elements by their protective systems, which may lead to cascading outages. The loss of synchronism of some generators may result from these outages or from operating conditions that violate a synchronous generator's field current limit, or in the case of variable speed wind turbine generator, the current limits of power switches. This paper investigates the impact of wind power plants on power system voltage stability by using synchrophasor measurements.

  15. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E. (Naperville, IL)

    1989-01-01

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  16. Unsplit bipolar pulse forming line

    DOE Patents [OSTI]

    Rhodes, Mark A. (Pleasanton, CA)

    2011-05-24

    A bipolar pulse forming transmission line module and system for linear induction accelerators having first, second, third, and fourth planar conductors which form a sequentially arranged interleaved stack having opposing first and second ends, with dielectric layers between the conductors. The first and second planar conductors are connected to each other at the first end, and the first and fourth planar conductors are connected to each other at the second end via a shorting plate. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short at the first end a high voltage from the third planar conductor to the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

  17. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  18. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

    1988-01-01

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  19. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  20. Power Services (pbl/about)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Power Services > About Power Services Power Services Home Page Other Related Web Sites Power Services Organization Power Services Financial Information Tribal Affairs Office...

  1. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  2. EIS-0294: Sutter Power Project, Sutter County, California

    Broader source: Energy.gov [DOE]

    This EIS analyzes Western Area Power Administration's (Western) decision to support Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kilovolt (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP).

  3. Kenko: An ultra fast track power plant for Bolivia

    SciTech Connect (OSTI)

    Jeffs, E.

    1996-01-01

    A Bolivian utility wanted gas turbine capacity to cover growth in electricity demand, until a new hydro power station could be completed. They turned to Wood Group Power Systems to supply two reconditioned Avon gensets, which were brought on line in a record time of six months from the contract date. This paper describes the specifications, shipping and installation in brief. 2 figs.

  4. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and

    Energy Savers [EERE]

    Sutter Counties, California | Department of Energy 14: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California Summary Western Area Power Administration (Western) and the Sacramento Municipal Utility District (SMUD) are preparing a joint EIS/environmental impact report (EIR) -under, respectively, NEPA and the California Environmental Quality Act - that

  5. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  6. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  7. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project;

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Yakima, Grant, Benton, and Kittitas Counties, Washington | Department of Energy 5: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington SUMMARY The Bureau of Land Management is preparing, with DOE's Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential

  8. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. | Department of Energy Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. Fact sheet describes the ThunderPower hydrogen fuel cell bus that was demonstrated at SunLine Transit Agency from

  9. Electric power 2007

    SciTech Connect (OSTI)

    2007-07-01

    Subjects covered include: power industry trends - near term fuel strategies - price/quality/delivery/opportunity; generating fleet optimization and plant optimization; power plant safety and security; coal power plants - upgrades and new capacity; IGCC, advanced combustion and CO{sub 2} capture technologies; gas turbine and combined cycle power plants; nuclear power; renewable power; plant operations and maintenance; power plant components - design and operation; environmental; regulatory issues, strategies and technologies; and advanced energy strategies and technologies. The presentations are in pdf format.

  10. Reducing Power Factor Cost

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low power factor is expensive and inefficient. Many utility companies charge you an additional fee if your power factor is less than 0.95. Low power factor also reduces your electrical system's distribu- tion capacity by increasing current flow and causing voltage drops. This fact sheet describes power factor and explains how you can improve your power factor to reduce electric bills and enhance your electrical system's capacity. REDUCING POWER FACTOR COST To understand power factor, visualize a

  11. Dynamic Power Flow Controller: Compact Dynamic Phase Angle Regulators for Transmission Power Routing

    SciTech Connect (OSTI)

    2012-01-03

    GENI Project: Varentec is developing compact, low-cost transmission power controllers with fractional power rating for controlling power flow on transmission networks. The technology will enhance grid operations through improved use of current assets and by dramatically reducing the number of transmission lines that have to be built to meet increasing contributions of renewable energy sources like wind and solar. The proposed transmission controllers would allow for the dynamic control of voltage and power flow, improving the grid’s ability to dispatch power in real time to the places where it is most needed. The controllers would work as fail-safe devices whereby the grid would be restored to its present operating state in the event of a controller malfunction instead of failing outright. The ability to affordably and dynamically control power flow with adequate fail-safe switchgear could open up new competitive energy markets which are not possible under the current regulatory structure and technology base.

  12. Proposed Action Title: U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Springfield, Christian County, Missouri SWPA F450.4 (Rev. 2/16) Proposed Action Description: Southwestern Power Administration proposes to modify and relocate a small seqment of transmission line to accommodate and provide safety clearance for a retail development project in an urbanized section of Springfield, Missouri.

  13. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power -

    Energy Savers [EERE]

    Great Northern Transmission Line: Amended Letter to New Border Crossing | Department of Energy Amended Letter to New Border Crossing Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Amended Letter to New Border Crossing Minnesota Power, an operating division of ALLETE, Inc., has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United

  14. Bibliography of the Maryland Power Plant Research Program, fifteenth edition

    SciTech Connect (OSTI)

    McLean, R.I.

    1994-02-01

    The Power Plant Siting Act of 1971 established the Power Plant Research Program to insure that demands for electric power would be met in a timely manner at a reasonable cost while assuring that the associated environmental impact would be acceptable. The scope of the Program extends to estimating the impact of proposed new generating facilities, evaluating the acceptability of proposed tranmission line routes, assessing the impact of existing generation facilities, and investigating generic issues related to power plant site evaluation and associated environmental and land use considerations. The bibliography is a compilation of all the studies performed for and or by the Power Plant and Environmental Review Division since its inception.

  15. Wind Concurrent Cooling Could Increase Power Transmission Potential by as

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Much as 40% | Department of Energy Concurrent Cooling Could Increase Power Transmission Potential by as Much as 40% Wind Concurrent Cooling Could Increase Power Transmission Potential by as Much as 40% May 18, 2015 - 5:40pm Addthis Researchers at the U.S. Department of Energy's (DOE's) Idaho National Laboratory (INL) are working with industry to model wind's cooling effects on power transmission lines to dynamically couple transmission systems with concurrent cooling processes. In areas

  16. Project Profile: Solar Power Tower Improvements with the Potential to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reduce Costs | Department of Energy Solar Power Tower Improvements with the Potential to Reduce Costs Project Profile: Solar Power Tower Improvements with the Potential to Reduce Costs Pratt Whitney Rocketdyne logo Rocketdyne, under the Baseload CSP FOA, is designing, fabricating, and testing a several components of a molten salt solar power tower that is in line with SunShot Initiative cost targets. Approach Receiver test panel design incorporates significant cost reductions. Rocketdyne is

  17. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Radiometric measurement quality * Accuracy of calculation (LBLRTMCHARTS) * Line parameters (HITRAN) * MTCKD continuum model * Extraterrestrial spectrum * Model inputs *...

  18. Petawatt pulsed-power accelerator

    DOE Patents [OSTI]

    Stygar, William A. (Albuquerque, NM); Cuneo, Michael E. (Albuquerque, NM); Headley, Daniel I. (Albuquerque, NM); Ives, Harry C. (Albuquerque, NM); Ives, legal representative; Berry Cottrell (Albuquerque, NM); Leeper, Ramon J. (Albuquerque, NM); Mazarakis, Michael G. (Albuquerque, NM); Olson, Craig L. (Albuquerque, NM); Porter, John L. (Sandia Park, NM); Wagoner; Tim C. (Albuquerque, NM)

    2010-03-16

    A petawatt pulsed-power accelerator can be driven by various types of electrical-pulse generators, including conventional Marx generators and linear-transformer drivers. The pulsed-power accelerator can be configured to drive an electrical load from one- or two-sides. Various types of loads can be driven; for example, the accelerator can be used to drive a high-current z-pinch load. When driven by slow-pulse generators (e.g., conventional Marx generators), the accelerator comprises an oil section comprising at least one pulse-generator level having a plurality of pulse generators; a water section comprising a pulse-forming circuit for each pulse generator and a level of monolithic triplate radial-transmission-line impedance transformers, that have variable impedance profiles, for each pulse-generator level; and a vacuum section comprising triplate magnetically insulated transmission lines that feed an electrical load. When driven by LTD generators or other fast-pulse generators, the need for the pulse-forming circuits in the water section can be eliminated.

  19. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  20. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power -

    Energy Savers [EERE]

    Great Northern Transmission Line | Department of Energy Line Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line Application from Great Northern (GNTL) to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-398 Great Northern Trans Line.pdf More Documents & Publications EIS-0499: Draft Environmental Impact Statement EIS-0499: Final Environmental Impact Statement Application for

  1. Four cavity efficiency enhanced magnetically insulated line oscillator

    DOE Patents [OSTI]

    Lemke, R.W.; Clark, M.C.; Calico, S.E.

    1998-04-21

    A four cavity, efficient magnetically insulated line oscillator (C4-E MILO) having seven vanes and six cavities formed within a tube-like structure surrounding a cathode is disclosed. The C4-E MILO has a primary slow wave structure which is comprised of four vanes and the four cavities located near a microwave exit end of the tube-like structure. The primary slow wave structure is the four cavity portion of the magnetically insulated line oscillator (MILO). An RF choke is provided which is comprised of three of the vanes and two of the cavities. The RF choke is located near a pulsed power source portion of the tube-like structure surrounding the cathode. The RF choke increases feedback in the primary slow wave structure, prevents microwaves generated in the primary slow wave structure from propagating towards the pulsed power source and modifies downstream electron current so as to enhance microwave power generation. A beam dump/extractor is located at the exit end of the oscillator tube for extracting microwave power from the oscillator, and in conjunction with an RF extractor vane, which comprises the fourth vane of the primary slow wave structure (nearest the exit) having a larger gap radius than the other vanes of the primary SWS, comprises an RF extractor. Uninsulated electron flow is returned downstream towards the exit along an anode/beam dump region located between the beam dump/extractor and the exit where the RF is radiated at said RF extractor vane located near the exit and the uninsulated electron flow is disposed at the beam dump/extractor. 34 figs.

  2. Four cavity efficiency enhanced magnetically insulated line oscillator

    DOE Patents [OSTI]

    Lemke, Raymond W.; Clark, Miles C.; Calico, Steve E.

    1998-04-21

    A four cavity, efficient magnetically insulated line oscillator (C4-E MILO) having seven vanes and six cavities formed within a tube-like structure surrounding a cathode. The C4-E MILO has a primary slow wave structure which is comprised of four vanes and the four cavities located near a microwave exit end of the tube-like structure. The primary slow wave structure is the four cavity (C4) portion of the magnetically insulated line oscillator (MILO). An RF choke is provided which is comprised of three of the vanes and two of the cavities. The RF choke is located near a pulsed power source portion of the tube-like structure surrounding the cathode. The RF choke increases feedback in the primary slow wave structure, prevents microwaves generated in the primary slow wave structure from propagating towards the pulsed power source and modifies downstream electron current so as to enhance microwave power generation. A beam dump/extractor is located at the exit end of the oscillator tube for extracting microwave power from the oscillator, and in conjunction with an RF extractor vane, which comprises the fourth vane of the primary slow wave structure (nearest the exit) having a larger gap radius than the other vanes of the primary SWS, comprises an RF extractor. Uninsulated electron flow is returned downstream towards the exit along an anode/beam dump region located between the beam dump/extractor and the exit where the RF is radiated at said RF extractor vane located near the exit and the uninsulated electron flow is disposed at the beam dump/extractor.

  3. WINDExchange: Selling Wind Power

    Wind Powering America (EERE)

    Market Sectors Printable Version Bookmark and Share Utility-Scale Wind Distributed Wind Motivations for Buying Wind Power Buying Wind Power Selling Wind Power Selling Wind Power Owners of wind turbines interconnected directly to the transmission or distribution grid, or that produce more power than the host consumes, can sell wind power as well as other generation attributes. Wind-Generated Electricity Electricity generated by wind turbines can be used to cover on-site energy needs

  4. NSLS-II Transport Line Progress

    SciTech Connect (OSTI)

    Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

    2012-05-20

    The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

  5. Electrolytes for power sources

    DOE Patents [OSTI]

    Doddapaneni, Narayan; Ingersoll, David

    1995-01-01

    Electrolytes for power sources, particularly alkaline and acidic power sources, comprising benzene polysulfonic acids and benzene polyphosphonic acids or salts of such acids.

  6. Electrolytes for power sources

    DOE Patents [OSTI]

    Doddapaneni, N.; Ingersoll, D.

    1995-01-03

    Electrolytes are disclosed for power sources, particularly alkaline and acidic power sources, comprising benzene polysulfonic acids and benzene polyphosphonic acids or salts of such acids. 7 figures.

  7. Supervisory Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations, J4800 Transmission Scheduling &...

  8. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIAPrivacy Act Submit a FOIA Request DOE FOIA Requester Service Center Electronic Reading Room FOIA Links Power Marketing Administrations' FOIA Links Bonneville Power ...

  9. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exit signs, kitchen equipment, network power management, power strips, showerheads, clothes washers, water heaters and ag stock tanks. Check IM for detailed requirements. c....

  10. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    agreement (Agreement) between the BC Hydro and Power uthority (BCH) and the Bonneville Power Administration (BP A), jointly the Parties, which BA for accounting purposes is...

  11. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2013 (Revised 060914) United States Department of Energy Bonneville Power Administration 905 N.E. 11th Avenue Portland, OR 97232 Bonneville Power Administration's 2014...

  12. Clean Fuels/Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & ... Twitter Google + Vimeo GovDelivery SlideShare Clean FuelsPower Home...

  13. Biomass: Potato Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POTATO POWER Curriculum: Biomass Power (organic chemistry, chemicalcarbon cycles, plants, energy resourcestransformations) Grade Level: Grades 2 to 3 Small groups (3 to 4) Time:...

  14. Concentrating Solar Power (CSP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas ...

  15. Concentrating Solar Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas ...

  16. Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations Transmission Scheduling and Security...

  17. Power Towers for Utilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering ...

  18. Portable Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Portable Power, Auxiliary Power Units, and R&D for Off-Road Fuel Cell Applications Research Projects Awarded April 2004

  19. EM Recovery Act Top Line Messages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Top Line Messages EM Recovery Act Top Line Messages The lastest Recovery Act performance related information and metrics. PDF icon EM Recovery Act Top Line Messages - April, 2013...

  20. Requirements for self-magnetically insulated transmission lines

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    VanDevender, J. Pace; Pointon, Timothy D.; Seidel, David B.; Struve, Kenneth W.; Jennings, Christopher; Oliver, Bryan V.; Schneider, Larry X.

    2015-03-01

    Self-magnetically insulated transmission lines (MITLs) connect pulsed-power drivers with a load. Although the technology was originally developed in the 1970s and is widely used today in super power generators, failure of the technology is the principal limitation on the power that can be delivered to an experiment. We address issues that are often overlooked, rejected after inadequate simulations, or covered by overly conservative assumptions: (i) electron retrapping in coupling MITLs to loads, (ii) the applicability of collisionless versus collisional electron flow, (iii) power transport efficiency as a function of the geometry at the beginning of the MITL, (iv) gap closuremore » and when gap closure can be neglected, and (v) the role of negative ions in causing anode plasmas and enhancing current losses. We suggest a practical set of conservative design requirements for self-magnetically insulated electron flow based on the results discussed in this paper and on previously published results. The requirements are not necessarily severe constraints in all MITL applications; however, each of the 18 suggested requirements should be examined in the design of a MITL and in the investigation of excessive losses.« less

  1. Requirements for self-magnetically insulated transmission lines

    SciTech Connect (OSTI)

    VanDevender, J. Pace; Pointon, Timothy D.; Seidel, David B.; Struve, Kenneth W.; Jennings, Christopher; Oliver, Bryan V.; Schneider, Larry X.

    2015-03-01

    Self-magnetically insulated transmission lines (MITLs) connect pulsed-power drivers with a load. Although the technology was originally developed in the 1970s and is widely used today in super power generators, failure of the technology is the principal limitation on the power that can be delivered to an experiment. We address issues that are often overlooked, rejected after inadequate simulations, or covered by overly conservative assumptions: (i) electron retrapping in coupling MITLs to loads, (ii) the applicability of collisionless versus collisional electron flow, (iii) power transport efficiency as a function of the geometry at the beginning of the MITL, (iv) gap closure and when gap closure can be neglected, and (v) the role of negative ions in causing anode plasmas and enhancing current losses. We suggest a practical set of conservative design requirements for self-magnetically insulated electron flow based on the results discussed in this paper and on previously published results. The requirements are not necessarily severe constraints in all MITL applications; however, each of the 18 suggested requirements should be examined in the design of a MITL and in the investigation of excessive losses.

  2. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  3. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    5 iii Acronyms DOE U.S. Department of Energy DSA Documented Safety Analysis HA Hazard Analysis LOI Line of Inquiry SAC Specific Administrative Control SRP Standard...

  4. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    for DOE nuclear facilities. This SRP, Safety Basis Program Review, contains five volumes to help strengthen the technical rigor of line management oversight and federal...

  5. Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September ...

  6. DOE Sustainability Reporting Open Line Help Call

    Broader source: Energy.gov [DOE]

    The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

  7. Secretary Bodman Praises Western States' "Frontier Line"

    Broader source: Energy.gov [DOE]

    WASHINGTON,DC- Secretary of Energy Samuel W. Bodman today released the following statement regarding the Frontier Line announced by Governors Arnold Schwarzenegger (CA), Kenny Guinn (NV), Jon...

  8. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Management JCO Justification for Continued Operation LOI Line of Inquiry PAAA Price Anderson Amendments Act PDSA Preliminary Documented Safety Analysis PHA Preliminary Hazards...

  9. Synchronization Algorithms for Co-Simulation of Power Grid and Communication Networks

    SciTech Connect (OSTI)

    Ciraci, Selim; Daily, Jeffrey A.; Agarwal, Khushbu; Fuller, Jason C.; Marinovici, Laurentiu D.; Fisher, Andrew R.

    2014-09-11

    The ongoing modernization of power grids consists of integrating them with communication networks in order to achieve robust and resilient control of grid operations. To understand the operation of the new smart grid, one approach is to use simulation software. Unfortunately, current power grid simulators at best utilize inadequate approximations to simulate communication networks, if at all. Cooperative simulation of specialized power grid and communication network simulators promises to more accurately reproduce the interactions of real smart grid deployments. However, co-simulation is a challenging problem. A co-simulation must manage the exchange of informa- tion, including the synchronization of simulator clocks, between all simulators while maintaining adequate computational perfor- mance. This paper describes two new conservative algorithms for reducing the overhead of time synchronization, namely Active Set Conservative and Reactive Conservative. We provide a detailed analysis of their performance characteristics with respect to the current state of the art including both conservative and optimistic synchronization algorithms. In addition, we provide guidelines for selecting the appropriate synchronization algorithm based on the requirements of the co-simulation. The newly proposed algorithms are shown to achieve as much as 14% and 63% im- provement, respectively, over the existing conservative algorithm.

  10. Lightweight bladder lined pressure vessels

    DOE Patents [OSTI]

    Mitlitsky, F.; Myers, B.; Magnotta, F.

    1998-08-25

    A lightweight, low permeability liner is described for graphite epoxy composite compressed gas storage vessels. The liner is composed of polymers that may or may not be coated with a thin layer of a low permeability material, such as silver, gold, or aluminum, deposited on a thin polymeric layer or substrate which is formed into a closed bladder using tori spherical or near tori spherical end caps, with or without bosses therein, about which a high strength to weight material, such as graphite epoxy composite shell, is formed to withstand the storage pressure forces. The polymeric substrate may be laminated on one or both sides with additional layers of polymeric film. The liner may be formed to a desired configuration using a dissolvable mandrel or by inflation techniques and the edges of the film sealed by heat sealing. The liner may be utilized in most any type of gas storage system, and is particularly applicable for hydrogen, gas mixtures, and oxygen used for vehicles, fuel cells or regenerative fuel cell applications, high altitude solar powered aircraft, hybrid energy storage/propulsion systems, and lunar/Mars space applications, and other applications requiring high cycle life. 19 figs.

  11. Lightweight bladder lined pressure vessels

    DOE Patents [OSTI]

    Mitlitsky, Fred (1125 Canton Ave., Livermore, CA 94550); Myers, Blake (4650 Almond Cir., Livermore, CA 94550); Magnotta, Frank (1206 Bacon Way, Lafayette, CA 94549)

    1998-01-01

    A lightweight, low permeability liner for graphite epoxy composite compressed gas storage vessels. The liner is composed of polymers that may or may not be coated with a thin layer of a low permeability material, such as silver, gold, or aluminum, deposited on a thin polymeric layer or substrate which is formed into a closed bladder using torispherical or near torispherical end caps, with or without bosses therein, about which a high strength to weight material, such as graphite epoxy composite shell, is formed to withstand the storage pressure forces. The polymeric substrate may be laminated on one or both sides with additional layers of polymeric film. The liner may be formed to a desired configuration using a dissolvable mandrel or by inflation techniques and the edges of the film seamed by heat sealing. The liner may be utilized in most any type of gas storage system, and is particularly applicable for hydrogen, gas mixtures, and oxygen used for vehicles, fuel cells or regenerative fuel cell applications, high altitude solar powered aircraft, hybrid energy storage/propulsion systems, and lunar/Mars space applications, and other applications requiring high cycle life.

  12. Delmarva Power Light Company Delmarva Power | Open Energy Information

    Open Energy Info (EERE)

    Delmarva Power Light Company Delmarva Power Jump to: navigation, search Name: Delmarva Power & Light Company (Delmarva Power) Place: Wilmington, Delaware Zip: 19886 Product:...

  13. Indiabulls Power Ltd formerly Sophia Power Company | Open Energy...

    Open Energy Info (EERE)

    Indiabulls Power Ltd formerly Sophia Power Company Jump to: navigation, search Name: Indiabulls Power Ltd. (formerly Sophia Power Company) Place: New Delhi, Delhi (NCT), India Zip:...

  14. Brookfield Renewable Power Corp formerly Brascan Power Corp ...

    Open Energy Info (EERE)

    Brookfield Renewable Power Corp formerly Brascan Power Corp Jump to: navigation, search Name: Brookfield Renewable Power Corp (formerly Brascan Power Corp) Place: Toronto, Ontario,...

  15. ENER G Combined Power formerly Combined Power Ltd | Open Energy...

    Open Energy Info (EERE)

    ENER G Combined Power formerly Combined Power Ltd Jump to: navigation, search Name: ENER.G Combined Power (formerly Combined Power Ltd) Place: United Kingdom Product: Specialises...

  16. Hydrogen Power Inc formerly Hydrogen Power International and...

    Open Energy Info (EERE)

    Power Inc formerly Hydrogen Power International and Equitex Inc Jump to: navigation, search Name: Hydrogen Power, Inc. (formerly Hydrogen Power International and Equitex Inc.)...

  17. Wind Powering America Webinar: Wind Power Economics: Past, Present...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Powering America Webinar: Wind Power Economics: Past, Present, and Future Trends Wind Powering America Webinar: Wind Power Economics: Past, Present, and Future Trends November ...

  18. Flex power perspectives of indirect power system control through...

    Open Energy Info (EERE)

    Flex power perspectives of indirect power system control through dynamic power price (Smart Grid Project) Jump to: navigation, search Project Name Flex power perspectives of...

  19. Karnataka Power Corporation Limited and National Thermal Power...

    Open Energy Info (EERE)

    Power Corporation Limited and National Thermal Power Corporation JV Jump to: navigation, search Name: Karnataka Power Corporation Limited and National Thermal Power Corporation JV...

  20. X-ray line polarization spectroscopy of Li-like satellite line spectra

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Journal Article: X-ray line polarization spectroscopy of Li-like satellite line spectra Citation Details In-Document Search Title: X-ray line polarization spectroscopy of Li-like satellite line spectra We apply the magnetic-sublevel atomic kinetics model POLAR to the calculation of polarization properties of satellite lines in Li-like Si driven by subpicosecond-duration laser pulses. We identify spectral lines whose polarization can serve as a marker of

  1. Distributed Power Flow Control: Distributed Power Flow Control using Smart Wires for Energy Routing

    SciTech Connect (OSTI)

    2012-04-24

    GENI Project: Smart Wire Grid is developing a solution for controlling power flow within the electric grid to better manage unused and overall transmission capacity. The 300,000 miles of high-voltage transmission line in the U.S. today are congested and inefficient, with only around 50% of all transmission capacity utilized at any given time. Increased consumer demand should be met in part with more efficient and an economical power flow. Smart Wire Grid’s devices clamp onto existing transmission lines and control the flow of power within—much like how internet routers help allocate bandwidth throughout the web. Smart wires could support greater use of renewable energy by providing more consistent control over how that energy is routed within the grid on a real-time basis. This would lessen the concerns surrounding the grid’s inability to effectively store intermittent energy from renewables for later use.

  2. Offshore Wind Power USA

    Broader source: Energy.gov [DOE]

    The Offshore Wind Power USA conference provides the latest offshore wind market updates and forecasts.

  3. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules Skip Navigation Links Excess Energy Hydro Peaking Power Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative (Rayburn) Hydro Power and Energy Sold to Sam Rayburn Municipal Power Agency (Willis) Non-Federal Transmission/Interconnection Facilities Service Contact swparates@swpa.gov Last Updated: January 05, 2016

  4. Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    Presentation covers the power purchase agreements taken from the FEMP Alternative Finance Options (AFO) webinar.

  5. Monitoring Biological Activity at Geothermal Power Plants

    SciTech Connect (OSTI)

    Peter Pryfogle

    2005-09-01

    The economic impact of microbial growth in geothermal power plants has been estimated to be as high as $500,000 annually for a 100 MWe plant. Many methods are available to monitor biological activity at these facilities; however, very few plants have any on-line monitoring program in place. Metal coupon, selective culturing (MPN), total organic carbon (TOC), adenosine triphosphate (ATP), respirometry, phospholipid fatty acid (PLFA), and denaturing gradient gel electrophoresis (DGGE) characterizations have been conducted using water samples collected from geothermal plants located in California and Utah. In addition, the on-line performance of a commercial electrochemical monitor, the BIoGEORGE?, has been evaluated during extended deployments at geothermal facilities. This report provides a review of these techniques, presents data on their application from laboratory and field studies, and discusses their value in characterizing and monitoring biological activities at geothermal power plants.

  6. EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

  7. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project is detailed in EIS-0129.

  8. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  9. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

  10. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  11. Soliton production with nonlinear homogeneous lines

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Elizondo-Decanini, Juan M.; Coleman, Phillip D.; Moorman, Matthew W.; Petney, Sharon Joy Victor; Dudley, Evan C.; Youngman, Kevin; Penner, Tim Dwight; Fang, Lu; Myers, Katherine M.

    2015-11-24

    Low- and high-voltage Soliton waves were produced and used to demonstrate collision and compression using diode-based nonlinear transmission lines. Experiments demonstrate soliton addition and compression using homogeneous nonlinear lines. We built the nonlinear lines using commercially available diodes. These diodes are chosen after their capacitance versus voltage dependence is used in a model and the line design characteristics are calculated and simulated. Nonlinear ceramic capacitors are then used to demonstrate high-voltage pulse amplification and compression. The line is designed such that a simple capacitor discharge, input signal, develops soliton trains in as few as 12 stages. We also demonstrated outputmore » voltages in excess of 40 kV using Y5V-based commercial capacitors. The results show some key features that determine efficient production of trains of solitons in the kilovolt range.« less

  12. Soliton production with nonlinear homogeneous lines

    SciTech Connect (OSTI)

    Elizondo-Decanini, Juan M.; Coleman, Phillip D.; Moorman, Matthew W.; Petney, Sharon Joy Victor; Dudley, Evan C.; Youngman, Kevin; Penner, Tim Dwight; Fang, Lu; Myers, Katherine M.

    2015-11-24

    Low- and high-voltage Soliton waves were produced and used to demonstrate collision and compression using diode-based nonlinear transmission lines. Experiments demonstrate soliton addition and compression using homogeneous nonlinear lines. We built the nonlinear lines using commercially available diodes. These diodes are chosen after their capacitance versus voltage dependence is used in a model and the line design characteristics are calculated and simulated. Nonlinear ceramic capacitors are then used to demonstrate high-voltage pulse amplification and compression. The line is designed such that a simple capacitor discharge, input signal, develops soliton trains in as few as 12 stages. We also demonstrated output voltages in excess of 40 kV using Y5V-based commercial capacitors. The results show some key features that determine efficient production of trains of solitons in the kilovolt range.

  13. Non-Linear Transmission Line (NLTL) Microwave Source Lecture Notes the United States Particle Accelerator School

    SciTech Connect (OSTI)

    Russell, Steven J.; Carlsten, Bruce E.

    2012-06-26

    We will quickly go through the history of the non-linear transmission lines (NLTLs). We will describe how they work, how they are modeled and how they are designed. Note that the field of high power, NLTL microwave sources is still under development, so this is just a snap shot of their current state. Topics discussed are: (1) Introduction to solitons and the KdV equation; (2) The lumped element non-linear transmission line; (3) Solution of the KdV equation; (4) Non-linear transmission lines at microwave frequencies; (5) Numerical methods for NLTL analysis; (6) Unipolar versus bipolar input; (7) High power NLTL pioneers; (8) Resistive versus reactive load; (9) Non-lineaer dielectrics; and (10) Effect of losses.

  14. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industry Reliability: Automotive Power Module Perspective Zhenxian Liang R&D Staff Power Electronics and Electric Machinery Group OAK RIDGE NATIONAL LABORATORY 2360 Cherahala Boulevard Knoxville, Tennessee 37932 TEL: (865) 946-1467 FAX: (865) 946-1262 EMAIL: liangz@ornl.gov http://peemrc.ornl.gov 2013 PV System Symposium April 30, 2013, Santa Clara, CA 2 Outline * Introduction Power Electronics in Electric Drive Vehicles Automotive Power Electronics Module Operation Automotive Power

  15. Raman Scattering Sensor for On-Line Monitoring of Amines and Acid Gases

    SciTech Connect (OSTI)

    Uibel, Rory; Smith, Lee

    2010-05-20

    Sulfur and CO2 removal from hydrocarbon streams and power plant effluents are a major problem. The sulfur is normally in the form of H2S. These two acid gases are scrubbed using aqueous amine solutions that are difficult to control with conventional technology. Process Instruments Inc. developed Raman scattering technology for on-line, real-time monitoring of amine streams to improve their efficiency in scrubbing H2S and CO2 from hydrocarbon streams and power plant effluents. Improved control of amine and acid gas concentrations will allow refineries, natural gas processes and power plants to more efficiently scrub Sulfur and CO2, saving energy, time and financial resources.

  16. TWRS privatization phase 1 electrical power system

    SciTech Connect (OSTI)

    Singh, G.

    1997-05-30

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW).

  17. 2014 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene

    Gasoline and Diesel Fuel Update (EIA)

    2014 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * Exclude: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course * Government (federal, state, local, and

  18. November 2012 Electrical Safety Occurrences

    Broader source: Energy.gov (indexed) [DOE]

    plug. X 4 10(2) 10 2 EM--PPPO-FBP- PORTSDD-2012- 0029 A trackhoe hit an overhead fiber optics line breaking two 13.8kV power poles near their bases. X R 10(3) 0 3 EM-ORO--UCOR-...

  19. AMS Ground Truth Measurements: Calibration and Test Lines

    SciTech Connect (OSTI)

    Wasiolek, P.

    2013-11-01

    Airborne gamma spectrometry is one of the primary techniques used to define the extent of ground contamination after a radiological incident. Its usefulness was demonstrated extensively during the response to the Fukushima nuclear power plant (NPP) accident in March-May 2011. To map ground contamination a set of scintillation detectors is mounted on an airborne platform (airplane or helicopter) and flown over contaminated areas. The acquisition system collects spectral information together with the aircraft position and altitude every second. To provide useful information to decision makers, the count rate data expressed in counts per second (cps) needs to be converted to the terrestrial component of the exposure rate 1 m above ground, or surface activity of isotopes of concern. This is done using conversion coefficients derived from calibration flights. During a large scale radiological event, multiple flights may be necessary and may require use of assets from different agencies. However, as the production of a single, consistent map product depicting the ground contamination is the primary goal, it is critical to establish very early into the event a common calibration line. Such a line should be flown periodically in order to normalize data collected from different aerial acquisition systems and potentially flown at different flight altitudes and speeds. In order to verify and validate individual aerial systems, the calibration line needs to be characterized in terms of ground truth measurements. This is especially important if the contamination is due to short-lived radionuclides. The process of establishing such a line, as well as necessary ground truth measurements, is described in this document.

  20. Selecting a static uninterruptible power supply

    SciTech Connect (OSTI)

    Palko, E.

    1996-10-01

    In the not-so-distant past, quality electric power received from the utility company could be properly defined as a power supply with reasonably good voltage regulation accompanied by relatively few and brief outages. This simple but adequate definition lost all validity with the launching of the solid-state electronic revolution--and most notably, with the proliferation of digital electronics. There are numerous types of power conditioners that eliminate or minimize power quality problems on an individual basis. Such equipment includes surge suppressors that effectively arrest transient spikes, voltage regulators that cope with problems of voltage deviation, and shielded isolation transformers that effectively screen out electrical noise. There are also hybrid conditioners that combine two or more of these individual functions. But when problems are severe, and supplied systems and equipment have a low tolerance level for even occasional and minor power quality aberrations--and where operations must be maintained on total loss of power--only a uninterruptible power supply (UPS) suffices. Static UPSs are offered in three basic versions--online, line interactive, and offline. Each is described.

  1. High power fast ramping power supplies

    SciTech Connect (OSTI)

    Marneris,I.; Bajon, E.; Bonati, R.; Sandberg, J.; Roser, T.; Tsoupas, N.

    2009-05-04

    Hundred megawatt level fast ramping power converters to drive proton and heavy ion machines are under research and development at accelerator facilities in the world. This is a leading edge technology. There are several topologies to achieve this power level. Their advantages and related issues will be discussed.

  2. Final Power Amplifier

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tube. The FPA is designed with tunable input and output transmission line cavity circuits, a grid decoupling circuit, an adjustable output coupler, high order mode...

  3. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Figure 3.2. Measurement locations: Fixed vessel (blue and black lines); Moving vessel (grey region) Moving vessel measurements: * 5 traverses were spatially and temporally...

  4. Power plant cumulative environmental impact report. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    This report presents the results of studies conducted by the Power Plant Siting Program (PPSP) to determine the cumulative impact of power plants on Maryland's environment. Included in this report are: (1) current and projected power demands and consumption in Maryland; (2) current and planned power generation; (3) air impacts; (4) aquatic effects; (5) radiological effects; (6) social and economic considerations; (7) noise impacts; (8) groundwater effects; (9) solid waste management concerns; (10) transmission line impacts; and (11) descriptions of cooling towers in Maryland. Also contained is the 1982 Ten Year Plan of Maryland Electric Utilities.

  5. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report

    SciTech Connect (OSTI)

    Eudy, L.; Chandler, K.

    2013-01-01

    SunLine Transit Agency, which provides public transit services to the Coachella Valley area of California, has demonstrated hydrogen and fuel cell bus technologies for more than 10 years. In May 2010, SunLine began demonstrating the advanced technology (AT) fuel cell bus with a hybrid electric propulsion system, fuel cell power system, and lithium-based hybrid batteries. This report describes operations at SunLine for the AT fuel cell bus and five compressed natural gas buses. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) is working with SunLine to evaluate the bus in real-world service to document the results and help determine the progress toward technology readiness. NREL has previously published three reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from February 2012 through November 2012.

  6. Getting to the starting line | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting to the starting line November 12, 2009 There are some analogies that keep on turning up when we describe what is going on either in the world or in our lives. The analogy of a race is one of those. When we achieve a great victory or complete a project, we may speak of crossing the finishing line. However, it is also recognized that it's often an achievement just to get to the starting line. About a year ago, we discussed with the Science Council what was happening with the free- electron

  7. Plastic Laminate Pulsed Power Development

    SciTech Connect (OSTI)

    ALEXANDER,JEFF A.; SHOPE,STEVEN L.; PATE,RONALD C.; RINEHART,LARRY F.; JOJOLA,JOHN M.; RUEBUSH,MITCHELL H.; CROWE,WAYNE; LUNDSTROM,J.; SMITH,T.; ZAGAR,D.; PRESTWICH,K.

    2000-09-01

    The desire to move high-energy Pulsed Power systems from the laboratory to practical field systems requires the development of compact lightweight drivers. This paper concerns an effort to develop such a system based on a plastic laminate strip Blumlein as the final pulseshaping stage for a 600 kV, 50ns, 5-ohm driver. A lifetime and breakdown study conducted with small-area samples identified Kapton sheet impregnated with Propylene Carbonate as the best material combination of those evaluated. The program has successfully demonstrated techniques for folding large area systems into compact geometry's and vacuum impregnating the laminate in the folded systems. The major operational challenges encountered revolve around edge grading and low inductance, low impedance switching. The design iterations and lessons learned are discussed. A multistage prototype testing program has demonstrated 600kV operation on a short 6ns line. Full-scale prototypes are currently undergoing development and testing.

  8. Power System Extreme Event Detection: The VulnerabilityFrontier

    SciTech Connect (OSTI)

    Lesieutre, Bernard C.; Pinar, Ali; Roy, Sandip

    2007-10-17

    In this work we apply graph theoretic tools to provide aclose bound on a frontier relating the number of line outages in a gridto the power disrupted by the outages. This frontier describes theboundary of a space relating the possible severity of a disturbance interms of power disruption, from zero to some maximum on the boundary, tothe number line outages involved in the event. We present the usefulnessof this analysis with a complete analysis of a 30 bus system, and presentresults for larger systems.

  9. Power Sales to Electric Utilities

    SciTech Connect (OSTI)

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

  10. Electrical Transmission Line Diametrical Retention Mechanism

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2006-01-03

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  11. Temperatures in the blast furnace refractory lining

    SciTech Connect (OSTI)

    Hebel, R.; Streuber, C.; Steiger, R.; Jeschar, R.

    1995-12-01

    The campaign life duration of a blast furnace is mainly determined by the condition of the refractory lining in heavy-duty zones such as the hearth, bosh, belly and lower stack. To achieve a desired lifetime, the temperature of the lining in these areas thereby proved to be the decisive controllable parameter. Low operating temperatures result in prolonged service life and are attained through high cooling efficiency. Besides the refractory grade chosen, the wear profile is mainly determined by the type of cooling system applied and the cooling intensity. Therefore, an appropriate compromise between long service life and energy losses has to be found in each case. In order to predict the service life of a lining it is important to know the wear condition at all times during the campaign. The paper describes the approaches the authors have made so far on European blast furnaces, on a theoretical and practical basis, on how to analyze the lining wear.

  12. Line Environment, Safety and Health Oversight

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-06-26

    Sets forth the Department's expectations line management environment, safety and health (ES&H) oversight and for the use of contractor self-assessment programs as the cornerstone for this oversight. Canceled by DOE O 226.1.

  13. DNA Assembly Line for Nano-Construction

    ScienceCinema (OSTI)

    Oleg Gang

    2010-01-08

    Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

  14. On-line chemical composition analyzer development

    SciTech Connect (OSTI)

    Garrison, A.A.

    1993-01-01

    This report relates to the development of an on-line Raman analyzer for control of a distillation column. It is divided into: program issues, experimental control system evaluation, energy savings analysis, and reliability analysis. (DLC)

  15. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  16. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  17. Vampire Power and Gaming

    Broader source: Energy.gov [DOE]

    There's something out there known as vampire power. Basically, many appliances that continue using power (and thus continue add to your energy bill in some way, shape or form) even when they are turned off.

  18. Space Solar Power Program

    SciTech Connect (OSTI)

    Arif, H.; Barbosa, H.; Bardet, C.; Baroud, M.; Behar, A.; Berrier, K.; Berthe, P.; Bertrand, R.; Bibyk, I.; Bisson, J.; Bloch, L.; Bobadilla, G.; Bourque, D.; Bush, L.; Carandang, R.; Chiku, T.; Crosby, N.; De Seixas, M.; De Vries, J.; Doll, S.; Dufour, F.; Eckart, P.; Fahey, M.; Fenot, F.; Foeckersperger, S.; Fontaine, J.E.; Fowler, R.; Frey, H.; Fujio, H.; Gasa, J.M.; Gleave, J.; Godoe, J.; Green, I.; Haeberli, R.; Hanada, T.; Ha

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  19. Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Sierra Nevada Region Power Systems Operation N4000 114 Parkshore Drive Folsom, CA...

  20. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sam Rayburn Dam Project Hydroelectric Power Rate Increase (Part B4.3) Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase (Part B4.3) Springfield-Nixa-Tabler...

  1. Underwater power generator

    SciTech Connect (OSTI)

    Bowley, W.W.

    1983-05-10

    Apparatus and method for generating electrical power by disposing a plurality of power producing modules in a substantially constant velocity ocean current and mechanically coupling the output of the modules to drive a single electrical generator is disclosed.

  2. Green Power Purchase Plan

    Broader source: Energy.gov [DOE]

    Class I renewable energy resources include solar, wind, new sustainable biomass, landfill gas, fuel cells (using renewable or non-renewable fuels), ocean thermal power, wave or tidal power, low...

  3. Concentrating Solar Power

    SciTech Connect (OSTI)

    Not Available

    2008-09-01

    Summarizes the goals and activities of the DOE Solar Energy Technologies Program efforts within its concentrating solar power subprogram.

  4. concentrating solar power plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    concentrating solar power plant - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  5. SOUTHWESTERN POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9/01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within

  6. Safer nuclear power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safer nuclear power 1663 Los Alamos science and technology magazine Latest Issue:October 2015 past issues All Issues » submit Safer nuclear power Experiments at Los Alamos reveal that alternative fuel rod cladding materials can make nuclear power plants dramatically less likely to suffer a Fukushima-type explosion in the event of a nuclear accident March 25, 2013 Safer nuclear power Nuclear generating station Los Alamos scientists, in collaboration with scientists from the Idaho and Oak Ridge

  7. 10 MWe power cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MWe power cycle - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  8. Green Power Purchasing

    Broader source: Energy.gov [DOE]

    Note: The green power purchasing goal has a target date of 2011. It has not been increased subsequently.

  9. high-power LEDs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    high-power LEDs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  10. power conversion efficiency

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    power conversion efficiency - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  11. thermal energy power conversion

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    thermal energy power conversion - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  12. Power Electronics Block Set

    Energy Science and Technology Software Center (OSTI)

    2008-12-31

    The software consists of code that will allow rapid prototyping of advanced power electronics for use in renewable energy systems.

  13. PowerPoint Presentation

    Gasoline and Diesel Fuel Update (EIA)

    David Sun, PhD david.sun@power.alstom.com Power Automation & Controls, Alstom Power Session: Intelligent Electric Systems Smart Power Future of Energy Sustainability © ALSTOM 2011. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or

  14. Nuclear Power & Engineering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power & Engineering - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  15. Powering | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Powering Whether generating or distributing power, in familiar or new forms, we're making sure the world has power when and where it's needed. Home > Impact > Powering Unimpossible Missions: GE researchers prove nothing is impossible A team of GE researchers came together over the course of several months to tackle three seemingly impossible missions. They were... Read More » The Building Blocks of Silicon Carbide, a Rising Star In today's fast-paced, high-energy, and highly competitive

  16. PowerPoint Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    restoration - Reroute power flows, change load patterns, improve voltage profiles - Minimal workforce intervention, auto notification for corrective actions and maintenance ...

  17. EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004)

    Broader source: Energy.gov [DOE]

    A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. ...

  18. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  19. Statistical analysis of cascading failures in power grids

    SciTech Connect (OSTI)

    Chertkov, Michael; Pfitzner, Rene; Turitsyn, Konstantin

    2010-12-01

    We introduce a new microscopic model of cascading failures in transmission power grids. This model accounts for automatic response of the grid to load fluctuations that take place on the scale of minutes, when optimum power flow adjustments and load shedding controls are unavailable. We describe extreme events, caused by load fluctuations, which cause cascading failures of loads, generators and lines. Our model is quasi-static in the causal, discrete time and sequential resolution of individual failures. The model, in its simplest realization based on the Directed Current description of the power flow problem, is tested on three standard IEEE systems consisting of 30, 39 and 118 buses. Our statistical analysis suggests a straightforward classification of cascading and islanding phases in terms of the ratios between average number of removed loads, generators and links. The analysis also demonstrates sensitivity to variations in line capacities. Future research challenges in modeling and control of cascading outages over real-world power networks are discussed.

  20. Southline Transmission Line | Open Energy Information

    Open Energy Info (EERE)

    Analysis Type EIS Applicant Southline Transmission, LLC, a subsidiary of Hunt Power L.P. Consultant SWCA Environmental Consultants Geothermal Area Project Location Project...

  1. Line Extension Analysis | Open Energy Information

    Open Energy Info (EERE)

    Coal with CCS Concentrating Solar Power Energy Storage Fuel Cells Geothermal Electric Natural Gas Nuclear Wind energy BiomassBiogas Hydroelectric energy Hydroelectric (Small)...

  2. Case Study - Florida Power & Light - Smart Grid Solutions Strengthen Reliability and Services - July 2012.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Florida Power & Light July 2012 1 Smart devices have been installed on 78 substation transformer banks. Smart Grid Solutions Strengthen Electric Reliability and Customer Services in Florida With 4.6 million customers, nearly 70,000 miles of power lines and 16 power plants, Florida Power and Light Company (FPL) is one of the nation's largest electric utilities. FPL says maintaining reliable service while keeping rates affordable is "Job One." While pursuing its mission, FPL is

  3. U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 Structure 38-44, 59 and 60 Transmission Structure Movement Project Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Jonesboro, Arkansas, Craighead County Proposed Action Description: Southwestern Power Administration proposes to move several transmission line pole structures which are currently located on elevated gravel mounds and relocate several other structures. Categorical Exclusion(s) Applied: 10 CFR 1021, Appendix B to Subpart D, Part B2.5-

  4. Ultra-Efficient and Power-Dense Electric Motors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Power-Dense Electric Motors Advanced Electric Motors Offer Large Energy Savings in Industrial Applications Pumps, fans, and compressors use more than 60% of industrial electric motor energy in the United States. The most widely used motors in these applications are constant-speed motors that are started and run across the line. In some applications, variable- speed motors, powered from an open-loop variable-speed drive, are utilized without any rotor position feedback device to achieve more

  5. Most Viewed Documents - Power Generation and Distribution | OSTI, US Dept

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy, Office of Scientific and Technical Information - Power Generation and Distribution Electric power high-voltage transmission lines: Design options, cost, and electric and magnetic field levels Stoffel, J.B.; Pentecost, E.D.; Roman, R.D.; et al. (1994) ASPEN Plus Simulation of CO2 Recovery Process Charles W. White III (2003) Systems and economic analysis of microalgae ponds for conversion of CO{sub 2} to biomass. Quarterly technical progress report, September 1993--December 1993

  6. MEASURING THE JET POWER OF FLAT-SPECTRUM RADIO QUASARS

    SciTech Connect (OSTI)

    Shabala, S. S.; Santoso, J. S.; Godfrey, L. E. H.

    2012-09-10

    We use frequency-dependent position shifts of flat-spectrum radio cores to estimate the kinetic power of active galactic nucleus (AGN) jets. We find a correlation between the derived jet powers and AGN narrow-line luminosity, consistent with the well-known relation for radio galaxies and steep spectrum quasars. This technique can be applied to intrinsically weak jets even at high redshift.

  7. Federal Power Act section 202(c) - Hurricane Rita, September 2005 |

    Office of Environmental Management (EM)

    Department of Energy Rita, September 2005 Federal Power Act section 202(c) - Hurricane Rita, September 2005 On September 28, 2005, in response to "the massive devastation caused Hurricane Rita, which further exacerbated the dire condition caused by Hurricane Katrina", a 202(c) emergency order was issued authorizing CenterPoint Energy to temporarily connect electricity lines to restore power to Entergy Gulf States, Inc., as well as electric cooperatives and municipal customers

  8. Nonlinear interference noise in 100-Gbit s{sup -1} communication lines with the DP-QPSK modulation format

    SciTech Connect (OSTI)

    Gurkin, N V; Nanii, Oleg E; Novikov, A G; Plaksin, S O; Treshchikov, V N; Ubaydullaev, Rustam R

    2013-06-30

    The nonlinear interference noise power was measured experimentally as a function of the signal power and the length of the fibre coherent 100-Gbit s{sup -1} communication line, in which chromatic dispersion is not optically compensated. An expression was derived for the optimal signal power corresponding to a maximal excess of the measured optical signal-to-noise ratio (OSNR) over the OSNR required for conditionally error-free operation. The dependence of signal optimal power measured experimentally well agrees with the theoretical formula derived. (optical information transmission)

  9. Multimode power processor

    DOE Patents [OSTI]

    O'Sullivan, George A. (Pottersville, NJ); O'Sullivan, Joseph A. (St. Louis, MO)

    1999-01-01

    In one embodiment, a power processor which operates in three modes: an inverter mode wherein power is delivered from a battery to an AC power grid or load; a battery charger mode wherein the battery is charged by a generator; and a parallel mode wherein the generator supplies power to the AC power grid or load in parallel with the battery. In the parallel mode, the system adapts to arbitrary non-linear loads. The power processor may operate on a per-phase basis wherein the load may be synthetically transferred from one phase to another by way of a bumpless transfer which causes no interruption of power to the load when transferring energy sources. Voltage transients and frequency transients delivered to the load when switching between the generator and battery sources are minimized, thereby providing an uninterruptible power supply. The power processor may be used as part of a hybrid electrical power source system which may contain, in one embodiment, a photovoltaic array, diesel engine, and battery power sources.

  10. Multimode power processor

    DOE Patents [OSTI]

    O'Sullivan, G.A.; O'Sullivan, J.A.

    1999-07-27

    In one embodiment, a power processor which operates in three modes: an inverter mode wherein power is delivered from a battery to an AC power grid or load; a battery charger mode wherein the battery is charged by a generator; and a parallel mode wherein the generator supplies power to the AC power grid or load in parallel with the battery. In the parallel mode, the system adapts to arbitrary non-linear loads. The power processor may operate on a per-phase basis wherein the load may be synthetically transferred from one phase to another by way of a bumpless transfer which causes no interruption of power to the load when transferring energy sources. Voltage transients and frequency transients delivered to the load when switching between the generator and battery sources are minimized, thereby providing an uninterruptible power supply. The power processor may be used as part of a hybrid electrical power source system which may contain, in one embodiment, a photovoltaic array, diesel engine, and battery power sources. 31 figs.

  11. Nuclear Power in Space

    DOE R&D Accomplishments [OSTI]

    1994-01-01

    In the early years of the United States space program, lightweight batteries, fuel cells, and solar modules provided electric power for space missions. As missions became more ambitious and complex, power needs increased and scientists investigated various options to meet these challenging power requirements. One of the options was nuclear energy. By the mid-1950s, research had begun in earnest on ways to use nuclear power in space. These efforts resulted in the first radioisotope thermoelectric generators (RTGs), which are nuclear power generators build specifically for space and special terrestrial uses. These RTGs convert the heat generated from the natural decay of their radioactive fuel into electricity. RTGs have powered many spacecraft used for exploring the outer planets of the solar system and orbiting the sun and Earth. They have also landed on Mars and the moon. They provide the power that enables us to see and learn about even the farthermost objects in our solar system.

  12. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  13. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  14. EERE Success Story-Kingston Creek Hydro Project Powers 100 Households...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Kingston Creek Project-benefitting the Young Brothers Ranch-is a 175-kilowatt hydro generation plant on private land that takes advantage of an existing stream and power line. ...

  15. EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona

    Broader source: Energy.gov [DOE]

    DOEs Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Services construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

  16. Bulk Vitrification Performance Enhancement: Refractory Lining Protection Against Molten Salt Penetration

    SciTech Connect (OSTI)

    Hrma, Pavel R.; Bagaasen, Larry M.; Schweiger, Michael J.; Evans, Michael B.; Smith, Benjamin T.; Arrigoni, Benjamin M.; Kim, Dong-Sang; Rodriguez, Carmen P.; Yokuda, Satoru T.; Matyas, Josef; Buchmiller, William C.; Gallegos, Autumn B.; Fluegel, Alexander

    2007-08-06

    Bulk vitrification (BV) is a process that heats a feed material that consists of glass-forming solids and dried low-activity waste (LAW) in a disposable refractory-lined metal box using electrical power supplied through carbon electrodes. The feed is heated to the point that the LAW decomposes and combines with the solids to generate a vitreous waste form. This study supports the BV design and operations by exploring various methods aimed at reducing the quantities of soluble Tc in the castable refractory block portion of the refractory lining, which limits the effectiveness of the final waste form.

  17. Multi-keV x-ray sources from metal-lined cylindrical hohlraums (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Multi-keV x-ray sources from metal-lined cylindrical hohlraums Citation Details In-Document Search Title: Multi-keV x-ray sources from metal-lined cylindrical hohlraums As multi-keV x-ray sources, plastic hohlraums with inner walls coated with titanium, copper, and germanium have been fired on Omega in September 2009. For all the targets, the measured and calculated multi-keV x-ray power time histories are in a good qualitative agreement. In the same irradiation

  18. Radiological Worker Training Power Point Slides for App. A

    Energy Savers [EERE]

    1.1 DOE-HDBK-1130-2008 Overhead 1.1 Regulatory Documents Objectives: * Identify the hierarchy of regulatory documents. * Define the purposes of 10 CFR Parts 820, 830 and 835. * Define the purpose of the DOE Radiological Control Standard. OT 1.2 DOE-HDBK-1130-2008 Overhead 1.2 Regulatory Documents (cont.) Objectives: * Define the terms "shall" and "should" as used in the above documents. * Describe the role of the Defense Nuclear Facilities Safety Board (DNFSB) at DOE sites

  19. The Imaging and Medical Beam Line at the Australian Synchrotron

    SciTech Connect (OSTI)

    Hausermann, Daniel; Hall, Chris; Maksimenko, Anton; Campbell, Colin [Australian Synchrotron Company, 800 Blackburn Road, Clayton, Victoria 3168 (Australia)

    2010-07-23

    As a result of the enthusiastic support from the Australian biomedical, medical and clinical communities, the Australian Synchrotron is constructing a world-class facility for medical research, the 'Imaging and Medical Beamline'. The IMBL began phased commissioning in late 2008 and is scheduled to commence the first clinical research programs with patients in 2011. It will provide unrivalled x-ray facilities for imaging and radiotherapy for a wide range of research applications in diseases, treatments and understanding of physiological processes. The main clinical research drivers are currently high resolution and sensitivity cardiac and breast imaging, cell tracking applied to regenerative and stem cell medicine and cancer therapies. The beam line has a maximum source to sample distance of 136 m and will deliver a 60 cm by 4 cm x-ray beam1 - monochromatic and white - to a three storey satellite building fully equipped for pre-clinical and clinical research. Currently operating with a 1.4 Tesla multi-pole wiggler, it will upgrade to a 4.2 Tesla device which requires the ability to handle up to 21 kW of x-ray power at any point along the beam line. The applications envisaged for this facility include imaging thick objects encompassing materials, humans and animals. Imaging can be performed in the range 15-150 keV. Radiotherapy research typically requires energies between 30 and 120 keV, for both monochromatic and broad beam.

  20. EPA Green Power Leadership Awards

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency (EPA) Green Power Leadership Awards recognize exceptional achievement among EPA Green Power Partners and among green power suppliers.

  1. Xtreme Power | Open Energy Information

    Open Energy Info (EERE)

    Zip: 78640 Product: Xtreme Power designs and manufactures power systems using power electronics and efficient storage technologies. Coordinates: 29.98837, -97.877369 Show Map...

  2. Eastern Power Customer Services Manager

    Broader source: Energy.gov [DOE]

    This position is located in the Eastern Power Services organization (PSE) of Northwest Requirements Marketing, Power Services, and Bonneville Power Administration (BPA). Northwest (NW) Requirements...

  3. Western Power Customer Services Manager

    Broader source: Energy.gov [DOE]

    This position is located in the Western Power Services organization (PSW) of Northwest Requirements Marketing, Power Services, and Bonneville Power Administration (BPA). Northwest (NW) Requirements...

  4. Solartech Power | Open Energy Information

    Open Energy Info (EERE)

    Solartech Power Jump to: navigation, search Name: Solartech Power Place: Cerritos, California Zip: 90703 Sector: Solar Product: Solartech power is a distributer of solar modules....

  5. Power County | Open Energy Information

    Open Energy Info (EERE)

    County Jump to: navigation, search Name Power County Facility Power County Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner CG Power...

  6. Celestial Power | Open Energy Information

    Open Energy Info (EERE)

    ":"","group":"","inlineLabel":"","visitedicon":"" Hide Map References: Celestial Power Web Site1 Celestial Power Company Profile2 Celestial Power was founded by Jim Sylvana...

  7. Wind Power (pbl/generation)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Wind Power (Updated June 16, 2014) Project Descriptions Foote Creek I Wind Project (Carbon...

  8. Discount Power | Open Energy Information

    Open Energy Info (EERE)

    Power Place: Texas Website: www.discountpowertx.com Twitter: @DiscountPowerTX Facebook: https:www.facebook.compagesDiscount-Power-Texas1381444972140165 Outage Hotline:...

  9. Perfect Power | Open Energy Information

    Open Energy Info (EERE)

    Perfect Power Jump to: navigation, search Name: Perfect Power Place: Phoenix, Arizona Zip: 85028 Sector: Solar Product: Perfect Power operates the world(tm)s largest solar...

  10. Top 9 Things You Didn't Know About America's Power Grid | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy America's Power Grid Top 9 Things You Didn't Know About America's Power Grid November 20, 2014 - 10:07am Addthis Electrical transmission lines cross a snow-covered field in Dalles Dam, Oregon. | Energy Department photo. Electrical transmission lines cross a snow-covered field in Dalles Dam, Oregon. | Energy Department photo. Erin R. Pierce Erin R. Pierce Former Digital Communications Specialist, Office of Public Affairs How can I participate? Check out our Infographic on Understanding

  11. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power -

    Energy Savers [EERE]

    Great Northern Transmission Line: Comments from Roseau County Board of Commissioners | Department of Energy Comments from Roseau County Board of Commissioners Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Comments from Roseau County Board of Commissioners Motion was made by Commissioner Miller, seconded by Commissioner Falk on Minnesota Power - GNTL application to construct, operate, and maintain electric transmission facilities

  12. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (BPA) transmission line and right-of-way, does not belong to BPA. The record is the property of the Public Utility District Number One of Klickitat County, Washington. As the...

  13. EA-1726: Kahuku Wind Power, LLC Wind Power Generation Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Kahuku Wind Power, LLC Wind Power Generation Facility, O'ahu, HI EA-1726: Kahuku Wind Power, LLC Wind Power Generation Facility, O'ahu, HI May 3, 2010 EA-1726: Final ...

  14. Scotrenewables Wind Power and Marine Power Ltd | Open Energy...

    Open Energy Info (EERE)

    Wind Power and Marine Power Ltd Jump to: navigation, search Name: Scotrenewables Wind Power and Marine Power Ltd Place: Orkey, Scotland, United Kingdom Zip: KW16 3AW Sector:...

  15. Load-resistant coaxial transmission line

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2006-01-03

    A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

  16. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  17. RECONFIGURING POWER SYSTEMS TO MINIMIZE CASCADING FAILURES: MODELS AND ALGORITHMS

    SciTech Connect (OSTI)

    Bienstock, Daniel

    2014-04-11

    the main goal of this project was to develop new scientific tools, based on optimization techniques, with the purpose of controlling and modeling cascading failures of electrical power transmission systems. We have developed a high-quality tool for simulating cascading failures. The problem of how to control a cascade was addressed, with the aim of stopping the cascade with a minimum of load lost. Yet another aspect of cascade is the investigation of which events would trigger a cascade, or more appropriately the computation of the most harmful initiating event given some constraint on the severity of the event. One common feature of the cascade models described (indeed, of several of the cascade models found in the literature) is that we study thermally-induced line tripping. We have produced a study that accounts for exogenous randomness (e.g. wind and ambient temperature) that could affect the thermal behavior of a line, with a focus on controlling the power flow of the line while maintaining safe probability of line overload. This was done by means of a rigorous analysis of a stochastic version of the heat equation. we incorporated a model of randomness in the behavior of wind power output; again modeling an OPF-like problem that uses chance-constraints to maintain low probability of line overloads; this work has been continued so as to account for generator dynamics as well.

  18. Botas line repaired ahead of schedule

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    This paper reports on damaged sections of Botas' dual 30-in. gas line carrying USSR gas across the Marmara Sea to Turkey that were replaced 30 days ahead of contract schedule. Tefken Construction and Installation Co., Inc., Istanbul, working under a $4-million contract, replaced two sections on one of the dual lines near Ambarli, Turkey, within a two-month period. The offshore system stretches 33-mi under the Marmara Sea with some pipe laid at 262-ft maximum water depths. The scope of the project was to replace a 426-ft offshore approach to the northern shoreline and a 984-ft onshore section, which were damaged by a submarine landslide.

  19. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  20. 1 and 2-Dimensional Line Transfer Package

    Energy Science and Technology Software Center (OSTI)

    1990-07-01

    LXF1D is a one dimensional steady-state line transfer package designed to handle: overlapping and or interacting lines, planar, cylindrical, spherical (and special) geometries, doppler shifts, complete redistribution (CRD), partial redistribution (PRD). PRD requires the use of REDIST or some other package to produce emission profiles. LXF2D is a two dimensional version of LXF1D for xy and rz geometries. Both LXF1D and LXF2D are designed to be added to existing non-local thermodynamic equilibrium (NLTE) codes withmore » a minimum of effort.« less