Sample records for outage management system

  1. Scheduled System Outages

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclearHomeland andEffectsScanning/TransmissionScheduled System

  2. Outage managment and health physics issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2008-05-15T23:59:59.000Z

    The focus of the May-June issue is on outage management and health physics. Major articles include: Outage optimization initiatives, by George B. Beam, AREVA NP, Inc.; New plant based on excellent track records, by Jim Scarola, Progress Energy; Meeting customer needs and providing environmental benefits, by Peter S. Hastings, Duke Energy; Plants with 3-D design, by Jack A. Bailey, Tennessee Valley Authority; and Highest quality with exceptional planning, by Jason A. Walls, Duke Energy. Industry innovation articles include: Integrated exposure reduction plan, by Ed Wolfe, Exelon; Performance-based radiation worker training, by Joe Giuffre and Timothy Vriezerma, American Electric Power.

  3. Outage management and health physics issue, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2007-05-15T23:59:59.000Z

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: India: a potential commercial opportunity, a U.S. Department of Commerce Report, by Joe Neuhoff and Justin Rathke; The changing climate for nuclear energy, by Skip Bowman, Nuclear Energy Insitute; Selecting protective clothing, by J. Mark Price, Southern California Edison; and Succssful refurbishment outage, by Sudesh K. Gambhir, Omaha Public Power District. Industry innovation articles in this issue are: Containment radiation monitoring spiking, by Michael W. Lantz and Robert Routolo, Arizona Public Service Company; Improved outage performance, by Michael Powell and Troy Wilfong, Arizona Public Service Company, Palo Verde Nuclear Generating Station; Stop repacking valves and achieve leak-free performance, by Kenneth Hart, PPL Susquehanna LLC; and Head assembly upgrade package, by Timothy Petit, Dominion Nuclear.

  4. GUIDELINES FOR IMPLEMENTATION OF AN ADVANCED OUTAGE CONTROL CENTER TO IMPROVE OUTAGE COORDINATION, PROBLEM RESOLUTION, AND OUTAGE RISK MANAGEMENT

    SciTech Connect (OSTI)

    Germain, Shawn St; Farris, Ronald; Whaley, April M; Medema, Heather; Gertman, David

    2014-09-01T23:59:59.000Z

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Managing NPP outages is a complex and difficult task due to the large number of maintenance and repair activities that are accomplished in a short period of time. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information, and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status, and periodic briefings in the OCC. It is a difficult task to maintain current the information related to outage progress and discovered conditions. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across, and out of the OCC. The use of these technologies will allow information to be shared electronically, providing greater amounts of real-time information to the decision makers and allowing OCC coordinators to meet with supporting staff remotely. Passively monitoring status electronically through advances in the areas of mobile worker technologies, computer-based procedures, and automated work packages will reduce the current reliance on manually reporting progress. The use of these technologies will also improve the knowledge capture and management capabilities of the organization. The purpose of this research is to improve management of NPP outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

  5. Outage management and health physics issue, 2006

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2006-05-15T23:59:59.000Z

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: A design with experience for the U.S., by Michael J. Wallace, Constellation Generation Group; Hope to be among the first, by Randy Hutchinson, Entergy Nuclear; Plans to file COLs in 2008, by Garry Miller, Progress Energy; Evolution of ICRP's recommendations, by Lars-Erik Holm, ICRP; European network on education and training in radiological protection, by Michele Coeck, SCK-CEN, Belgium; Outage managment: an important tool for improving nuclear power plant performance, by Thomas Mazour and Jiri Mandula, IAEA, Austria; and Plant profile: Exploring new paths to excellence, by Anne Thomas, Exelon Nuclear.

  6. Predictive Compensation for Communication Outages in Networked Control Systems

    E-Print Network [OSTI]

    Johansson, Karl Henrik

    Predictive Compensation for Communication Outages in Networked Control Systems Erik Henriksson Henrik Sandberg Karl Henrik Johansson Abstract-- A predictive outage compensator co time instance, the predictive outage compensator suggests a replacement command based on the history

  7. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15T23:59:59.000Z

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  8. Reduced-Order Predictive Outage Compensators for Networked Systems

    E-Print Network [OSTI]

    Johansson, Karl Henrik

    Reduced-Order Predictive Outage Compensators for Networked Systems Erik Henriksson Henrik Sandberg communication outage of several samples in situations when the radio environment is noisy and low transmission power is desirable. We propose a method to compensate for outages by introducing a predictive outage

  9. An Efficient Energy Curtailment Scheme For Outage Management in Smart Grid

    E-Print Network [OSTI]

    Durrani, Salman

    as to minimize the total cost incurred to the system due to the power outage (i.e., social optimality). The game that a smart grid will transform the current power grid into one that functions more intelligently, giving J challenges for reliable smart grid operation is the post-outage management of power among the users

  10. Technology Integration Initiative In Support of Outage Management

    SciTech Connect (OSTI)

    Gregory Weatherby; David Gertman

    2012-07-01T23:59:59.000Z

    Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

  11. Nuclear Safety Risk Management in Refueling Outage of Qinshan Nuclear Power Plant

    SciTech Connect (OSTI)

    Meijing Wu; Guozhang Shen [Qinshan Nuclear power company (China)

    2006-07-01T23:59:59.000Z

    The NPP is used to planning maintenance, in-service inspection, surveillance test, fuel handling and design modification in the refueling outage; the operator response capability will be reduced plus some of the plant systems out of service or loss of power at this time. Based on 8 times refueling outage experiences of the Qinshan NPP, this article provide some good practice and lesson learned for the nuclear safety risk management focus at four safety function areas of Residual Heat Removal Capability, Inventory Control, Power availability and Reactivity control. (authors)

  12. Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

    SciTech Connect (OSTI)

    Shawn St. Germain; Ronald Farris; Heather Medeman

    2013-09-01T23:59:59.000Z

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near schedule depends upon the performance of the outage management organization. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status and periodic briefings in the OCC. Much of the information displayed in OCCs is static and out of date requiring an evaluation to determine if it is still valid. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across and out of the OCC. Additionally, advances in the areas of mobile worker technologies, computer based procedures and electronic work packages can be leveraged to improve the availability of real time status to outage managers.

  13. Preventing power outages Power system contingency analysis on the GPU

    E-Print Network [OSTI]

    Vuik, Kees

    problem. Moreover, the power system has to keep functioning properly even when a transmission line failsPreventing power outages Power system contingency analysis on the GPU To provide electricity generators, nuclear power plants, wind turbines, etc.) and a network of lines and cables to transmit

  14. Onsite Wastewater Treatment Systems: Responding to Power Outages and Floods

    E-Print Network [OSTI]

    Lesikar, Bruce J.; Mechell, Justin; Alexander, Rachel

    2008-10-23T23:59:59.000Z

    People and the environment can be harmed if a home's onsite wastewater treatment system does not work properly after a flood or power outage. This publication explains the steps to take after such an event to get the system back into service. 4 pp...

  15. Overview of Common Mode Outages in Power Systems

    SciTech Connect (OSTI)

    Papic, Milorad; Awodele , Kehinde; Billinton, Roy; Dent, Chris; Eager, Dan; Hamoud, Gomaa; Jirutitijaroen, Panida; Kumbale, Murali; Mitra, Joydeep; Samaan, Nader A.; Schneider, Alex; Singh, Chanan

    2012-11-10T23:59:59.000Z

    This paper is a result of ongoing activity carried out by Probability Applications for Common Mode Events (PACME) Task Force under the Reliability Risk and Probability Applications (RRPA) Subcommittee. The paper is intended to constitute a valid source of information and references about dealing with common-mode outages in power systems reliability analysis. This effort involves reviewing published literature and presenting state-of-the-art research and practical applications in the area of common-mode outages. Evaluation of available outage statistics show that there is a definite need for collective effort from academia and industry to not only recommended procedures for data collection and monitoring but also to provide appropriate mathematical models to assess such events.

  16. The detection, prevention and mitigation of cascading outages in the power system

    E-Print Network [OSTI]

    Song, Hongbiao

    2009-05-15T23:59:59.000Z

    This dissertation studies the causes and mechanism of power system cascading outages and develops new methods and new tools to help detect, prevent and mitigate the outages. Three effective solutions: a steady state control scheme, a transient...

  17. U.S. - Canada Power System Outage Task Force: Final Report on...

    Broader source: Energy.gov (indexed) [DOE]

    Connecticut and New Jersey, and the Canadian province of Ontario. U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force...

  18. Number and propagation of line outages in cascading events in electric power transmission systems

    E-Print Network [OSTI]

    Dobson, Ian

    Number and propagation of line outages in cascading events in electric power transmission systems that progressively weakens the system. Large electric power transmission systems occasionally have cascading failures of transmission lines. The multiple mechanisms involved these cascading outages are many and varied, and the power

  19. POWER SYSTEM LINE OUTAGE DETECTION AND IDENTIFICATION --A QUICKEST CHANGE DETECTION APPROACH

    E-Print Network [OSTI]

    Liberzon, Daniel

    POWER SYSTEM LINE OUTAGE DETECTION AND IDENTIFICATION -- A QUICKEST CHANGE DETECTION APPROACH Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign ABSTRACT A method to detect and isolate power system transmission line outages in near real-time is proposed

  20. Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th

    E-Print Network [OSTI]

    Firestone, Jeremy

    Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th at 12:00pm (Noon), the Central Utility Plant (CUP), which supplies steam service to over 100 buildings on the Newark campus, will be shut down for the annual Steam System Maintenance Outage. This effort is necessary each year to ensure

  1. Fast Detection and Mitigation of Cascading Outages in the Power System

    E-Print Network [OSTI]

    Pang, Chengzong

    2012-02-14T23:59:59.000Z

    This dissertation studies the causes and mechanism of power system cascading outages and proposes the improved interactive scheme between system-wide and local levels of monitoring and control to quickly detect, classify and mitigate the cascading...

  2. Outage Probability of MISO Broadcast Systems with Noisy Channel Side Information

    E-Print Network [OSTI]

    Lim, Teng Joon

    Outage Probability of MISO Broadcast Systems with Noisy Channel Side Information Alon Shalev output (MISO) systems. However, these schemes generally require perfect channel information) of a linear zero forcing transmitter, operating in a fading MISO broadcast channel. We consider a rectangular

  3. The detection, prevention and mitigation of cascading outages in the power system 

    E-Print Network [OSTI]

    Song, Hongbiao

    2009-05-15T23:59:59.000Z

    all the time, and takes actions when needed to help detect, prevent and mitigate the possible cascading outage. Comprehensive simulation studies have been implemented using the IEEE 14- bus, 24-bus, 39-bus and 118-bus systems and promising results show...

  4. Outage Performance of a Multiuser Distributed Antenna System in Underwater Acoustic Channels

    E-Print Network [OSTI]

    Wang, Zhengdao

    1 Outage Performance of a Multiuser Distributed Antenna System in Underwater Acoustic Channels Zhaohui Wang, Shengli Zhou, Zhengdao Wang, Josko Catipovic§ and Peter Willett Dept. of Electrical and Computer Engineering, University of Connecticut, Storrs, CT 06269, USA Dept. of Electrical and Computer

  5. IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 24, NO. 3, AUGUST 2009 1633 Direct Calculation of Line Outage Distribution Factors

    E-Print Network [OSTI]

    Fu, Yong

    IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 24, NO. 3, AUGUST 2009 1633 Direct Calculation of Line significantly the security analyses of power systems. This letter provides two direct proofs for expressing distribution factor, power transfer distribution factor, shift factor. I. INTRODUCTION LINE outage distribution

  6. Outage Log

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding access toTest andOptimize carbonOther FileDustyOur HistoryOurOutage

  7. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect (OSTI)

    None

    1980-07-01T23:59:59.000Z

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  8. Improving Distribution System Reliability Through Risk-base Doptimization of Fault Management and Improved Computer-based Fault Location

    E-Print Network [OSTI]

    Dong, Yimai

    2013-11-07T23:59:59.000Z

    )’s regulation on power quality. Optimization in fault management tasks has the potential of improving system reliability by reducing the duration and scale of outages caused by faults through fast fault isolation and service restoration. The research reported...

  9. Fast Detection and Mitigation of Cascading Outages in the Power System 

    E-Print Network [OSTI]

    Pang, Chengzong

    2012-02-14T23:59:59.000Z

    is developed to reduce the chance of relay misoperation. Comprehensive simulation studies have been implemented by using the IEEE 39-bus and 118-bus test systems. The results are promising because: The results from weighted vulnerability analysis could...

  10. Primary Outage-Based Resource Allocation Strategies

    E-Print Network [OSTI]

    Gesbert, David

    , the scheme would have governed transmitter power on a variable basis calculated to limit the energy at victim, 2003). Rather than merely regulate transmitter power at fixed levels, as it has been done in the past in this work by proposing three resource management strategies based on outage probability. The motivation

  11. Impact of Extreme Weather on Power System Blackouts and Forced Outages: New Challenges

    E-Print Network [OSTI]

    Dobson, Ian

    @neo.tamu.edu). climate is manifested in two aspects: (i) the contribution of electric power to the production of greenhouse gases (GHG) and other pollutants, and (2) the effect that severe weather has on the power system emissions, CO2 emissions account for more than 80 percent of the overall U.S. contribution and 38 percent

  12. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    SciTech Connect (OSTI)

    Gregory Weatherby

    2012-05-01T23:59:59.000Z

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

  13. Contingency Analysis of Cascading Line Outage Events

    SciTech Connect (OSTI)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01T23:59:59.000Z

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  14. How individual traces and interactive timelines could support outage execution - Toward an outage historian concept

    SciTech Connect (OSTI)

    Parfouru, S.; De-Beler, N. [EDF Recherche and Developpement, 6 quai Watier, 78400 Chatou (France)

    2012-07-01T23:59:59.000Z

    In the context of a project that is designing innovative ICT-based solutions for the organizational concept of outage management, we focus on the informational process of the OCR (Outage Control Room) underlying the execution of the outages. Informational process are based on structured and unstructured documents that have a key role in the collaborative processes and management of the outage. We especially track the structured and unstructured documents, electronically or not, from creation to sharing. Our analysis allows us to consider that the individual traces produced by an individual participant with a specific role could be multi-purpose and support sharing between participants without creating duplication of work. The ultimate goal is to be able to generate an outage historian, that is not just focused on highly structured information, which could be useful to improve the continuity of information between participants. We study the implementation of this approach through web technologies and social media tools to address this issue. We also investigate the issue of data access through interactive visualization timelines coupled with other modality's to assist users in the navigation and exploration of the proposed historian. (authors)

  15. Project Management Plan Resident Management System (RMS)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

  16. Landscape Management Systems The Visual Management System

    E-Print Network [OSTI]

    Standiford, Richard B.

    Landscape Management Systems The Visual Management System of the Forest Service, USDA1 Warren R presentation on how the Visual Management System (VMS) functions. 1/ Presented at the National Conference Manual 2380, Landscape Management, USDA. INTRODUCTION The American people are concerned about the quality

  17. Environmental Management System Plan

    E-Print Network [OSTI]

    Fox, Robert

    2009-01-01T23:59:59.000Z

    Management Program, R-3 • Environmental Management SystemEnvironmental policy 3. Environmental aspects 4. Legal andObjectives, targets, and Environmental Management Programs

  18. Development of an Integrated Distribution Management System

    SciTech Connect (OSTI)

    Schatz, Joe E.

    2010-10-20T23:59:59.000Z

    This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

  19. Outage probability at finite SNR

    E-Print Network [OSTI]

    Akçaba, Cemal

    2004-01-01T23:59:59.000Z

    In this thesis, we present a technique to reduce the outage probability of a single user multiple input multiple output (MIMO) channel when a sub-optimal transceiver architecture is used. We show that in slow-fading ...

  20. Computerized Maintenance Management Systems

    Broader source: Energy.gov [DOE]

    Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

  1. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    SciTech Connect (OSTI)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01T23:59:59.000Z

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

  2. Energy Management Systems

    E-Print Network [OSTI]

    Ferland, K.

    2007-01-01T23:59:59.000Z

    This presentation will address results from a pilot project with 10 chemical plants on energy management systems and the development of an energy efficiency plant certification program....

  3. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-11-02T23:59:59.000Z

    The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Cancels DOE O 151.1B.

  4. Tritium Reduction and Control in the Vacuum Vessel During TFTR Outage and Decommissioning *

    E-Print Network [OSTI]

    Tritium Reduction and Control in the Vacuum Vessel During TFTR Outage and Decommissioning * W of the torus, a three tier system was developed for the outage in order to reduce and control the free tritium. The first phase of the program to reduce the free tritium consisted of direct flowthrough of room air

  5. Tritium Reduction and Control in the Vacuum Vessel During TFTR Outage and Decommissioning*

    E-Print Network [OSTI]

    Tritium Reduction and Control in the Vacuum Vessel During TFTR Outage and Decommissioning* W, a three tier system was developed for the outage in order to reduce and control the free tritium. The first phase of the program to reduce the free tritium consisted of direct flowthrough of room air

  6. LRRB Pavement Management Systems Pavement Management Systems

    E-Print Network [OSTI]

    Minnesota, University of

    Survey: who is using what · Details about specific software/use · Case studies #12;Report (continued) Key Outcome ­ Matrix #12;Report (continued) Key Outcome ­ Case Studies (15 agencies) § Various levels of use Pavement Management Systems Workshop outline 1. Overview 2. Benefits 3. Elements 4. Case Studies 5

  7. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-01T23:59:59.000Z

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

  8. Lithium battery management system

    DOE Patents [OSTI]

    Dougherty, Thomas J. (Waukesha, WI)

    2012-05-08T23:59:59.000Z

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  9. Assessment of Critical Events Corridors through Multivariate Cascading Outages Analysis

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Samaan, Nader A.; Diao, Ruisheng; Kumbale, Murali; Chen, Yousu; Singh, Ruchi; Green, Irina; Morgan, Mark P.

    2011-10-17T23:59:59.000Z

    Massive blackouts of electrical power systems in North America over the past decade has focused increasing attention upon ways to identify and simulate network events that may potentially lead to widespread network collapse. This paper summarizes a method to simulate power-system vulnerability to cascading failures to a supplied set of initiating events synonymously termed as Extreme Events. The implemented simulation method is currently confined to simulating steady state power-system response to a set of extreme events. The outlined method of simulation is meant to augment and provide a new insight into bulk power transmission network planning that at present remains mainly confined to maintaining power system security for single and double component outages under a number of projected future network operating conditions. Although one of the aims of this paper is to demonstrate the feasibility of simulating network vulnerability to cascading outages, a more important goal has been to determine vulnerable parts of the network that may potentially be strengthened in practice so as to mitigate system susceptibility to cascading failures. This paper proposes to demonstrate a systematic approach to analyze extreme events and identify vulnerable system elements that may be contributing to cascading outages. The hypothesis of critical events corridors is proposed to represent repeating sequential outages that can occur in the system for multiple initiating events. The new concept helps to identify system reinforcements that planners could engineer in order to 'break' the critical events sequences and therefore lessen the likelihood of cascading outages. This hypothesis has been successfully validated with a California power system model.

  10. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    SciTech Connect (OSTI)

    Shawn St. Germain; Kenneth Thomas; Ronald Farris; Jeffrey Joe

    2014-09-01T23:59:59.000Z

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

  11. Oil field management system

    DOE Patents [OSTI]

    Fincke, James R.

    2003-09-23T23:59:59.000Z

    Oil field management systems and methods for managing operation of one or more wells producing a high void fraction multiphase flow. The system includes a differential pressure flow meter which samples pressure readings at various points of interest throughout the system and uses pressure differentials derived from the pressure readings to determine gas and liquid phase mass flow rates of the high void fraction multiphase flow. One or both of the gas and liquid phase mass flow rates are then compared with predetermined criteria. In the event such mass flow rates satisfy the predetermined criteria, a well control system implements a correlating adjustment action respecting the multiphase flow. In this way, various parameters regarding the high void fraction multiphase flow are used as control inputs to the well control system and thus facilitate management of well operations.

  12. Computer memory management system

    DOE Patents [OSTI]

    Kirk, III, Whitson John (Greenwood, MO)

    2002-01-01T23:59:59.000Z

    A computer memory management system utilizing a memory structure system of "intelligent" pointers in which information related to the use status of the memory structure is designed into the pointer. Through this pointer system, The present invention provides essentially automatic memory management (often referred to as garbage collection) by allowing relationships between objects to have definite memory management behavior by use of coding protocol which describes when relationships should be maintained and when the relationships should be broken. In one aspect, the present invention system allows automatic breaking of strong links to facilitate object garbage collection, coupled with relationship adjectives which define deletion of associated objects. In another aspect, The present invention includes simple-to-use infinite undo/redo functionality in that it has the capability, through a simple function call, to undo all of the changes made to a data model since the previous `valid state` was noted.

  13. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, Joao E. (North Augusta, SC); Williams, Daniel W. (Aiken, SC)

    1996-01-01T23:59:59.000Z

    A purge water management system for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  14. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, J.E.; Williams, D.W.

    1995-01-01T23:59:59.000Z

    A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  15. Steam System Data Management

    E-Print Network [OSTI]

    Roberts, D.

    2013-01-01T23:59:59.000Z

    Steam System Data Management What Does It Include Safety In Motion Wal?Tech?Valve,?Inc. 251?438?2203 The Real Genius Behind Technology Is People ESL-IE-13-05-35 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New... ? Fabrication Training (Six Year Training) ? Welding Certifications ?Retired From Chevron After 25 Years ? Established A Steam System Program ? Planner For Routine Maintenance Work ? Planner For Steam System Improvements ? Wal-Tech Valve, Inc. ? Purchased...

  16. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-29T23:59:59.000Z

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. (This is an administrative change to DOE O 151.1A). Canceled by DOE O 151.1C. Cancels DOE O 151.1A.

  17. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-08-21T23:59:59.000Z

    The Order establishes policy and assigns and describes roles and responsibilities for the DOE Emergency Management System. Cancels DOE 5500.1B, DOE 5500.2B, DOE 5500.3A, DOE 5500.4A, 5500.5A,5500.7B, 5500.8A, 5500.9A, DOE 5500.10

  18. Power System load management

    SciTech Connect (OSTI)

    Rudenko, Yu.N.; Semenov, V.A.; Sovalov, S.A.; Syutkin, B.D.

    1984-01-01T23:59:59.000Z

    The variation in demand nonuniformity is analyzed for the Unified Electric Power System of the USSR and certain interconnected power systems; the conditions for handling such nonuniformity with utilization of generating equipment having differing flexibility capabilities are also considered. On this basis approaches and techniques for acting on user loads, load management, in order to assure a balance between generated and consumed power are considered.

  19. Power management system

    DOE Patents [OSTI]

    Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

    2007-10-02T23:59:59.000Z

    A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

  20. Training Management Information System

    SciTech Connect (OSTI)

    Rackley, M.P.

    1989-01-01T23:59:59.000Z

    The Training Management Information System (TMIS) is an integrated information system for all training related activities. TMIS is at the leading edge of training information systems used in the nuclear industry. The database contains all the necessary records to confirm the department's adherence to accreditation criteria and houses all test questions, student records and information needed to evaluate the training process. The key to the TMIS system is that the impact of any change (i.e., procedure change, new equipment, safety incident in the commercial nuclear industry, etc.) can be tracked throughout the training process. This ensures the best training can be performed that meets the needs of the employees. TMIS is comprised of six functional areas: Job and Task Analysis, Training Materials Design and Development, Exam Management, Student Records/Scheduling, Evaluation, and Commitment Tracking. The system consists of a VAX 6320 Cluster with IBM and MacIntosh computers tied into an ethernet with the VAX. Other peripherals are also tied into the system: Exam Generation Stations to include mark sense readers for test grading, Production PC's for Desk-Top Publishing of Training Material, and PC Image Workstations. 5 figs.

  1. Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-25T23:59:59.000Z

    The order establishes policy, and assigns and describes roles and responsibilities for the DOE Emergency Management System. DOE 5500.1B Chg 1; DOE 5500.2B Chg 1; DOE 5500.3A Chg 1; DOE 5500.4A; DOE 5500.5A; DOE 5500.7B; DOE 5500.8A; DOE 5500.9A, and DOE 5500.10A Chg 1. Canceled by DOE O 151.1A.

  2. Controlled Tripping of Overheated Lines Mitigates Power Outages

    E-Print Network [OSTI]

    Pfitzner, René; Chertkov, Michael

    2011-01-01T23:59:59.000Z

    We study cascades of blackouts in the model of the Polish (transmission) power grid (2700 nodes and 3504 transmission lines). A cascade is initiated by a sufficiently severe initial contingency tripping. The cascade advances via sequential tripping of many more overheated lines (with the thermal limits exceeded), islanding loads and generators and eventually arriving at a fixed point with the surviving part of the system being power- flow-balanced and the rest of the system being outaged. Utilizing the quasi-static model for cascade propagation, introduced in our earlier study (Statistical Classification of Cascading Failures in Power Grids, IEEE PES GM 2011), we analyze how the severity of the cascade depends on the order of tripping overheated lines. Our main observation is that the order of tripping has a tremendous effect on the size of the resulting outage: the probability distribution function of the outage size is broad; moreover in many of the cases studied, picking an overheated line at random result...

  3. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24T23:59:59.000Z

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

  4. Computer Systems and Network Manager

    E-Print Network [OSTI]

    Computer Systems and Network Manager Fort Collins, Colorado POSITION A Computers Systems activities. RESPONSIBILITIES The successful candidate will perform computer systems and network administration, including computer hardware, systems software, applications software, and all configurations

  5. Survey of tools for risk assessment of cascading outages

    SciTech Connect (OSTI)

    Papic, Milorad; Bell, Keith; Chen, Yousu; Dobson, Ian; Fonte, Louis; Haq, Enamul; Hines, Paul; Kirschen, Daniel; Luo, Xiaochuan; Miller, Stephen; Samaan, Nader A.; Vaiman, Marianna; Varghese, Matthew; Zhang, Pei

    2011-10-01T23:59:59.000Z

    Abstract-This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers [1, 2] are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the second of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. The first paper reviews the state of the art in methodologies for performing risk assessment of potential cascading outages [3]. This paper describes the state of the art in cascading failure modeling tools, documenting the view of experts representing utilities, universities and consulting companies. The paper is intended to constitute a valid source of information and references about presently available tools that deal with prediction of cascading failure events. This effort involves reviewing published literature and other documentation from vendors, universities and research institutions. The assessment of cascading outages risk evaluation is in continuous evolution. Investigations to gain even better understanding and identification of cascading events are the subject of several research programs underway aimed at solving the complexity of these events that electrical utilities face today. Assessing the risk of cascading failure events in planning and operation for power transmission systems require adequate mathematical tools/software.

  6. Environmental management system.

    SciTech Connect (OSTI)

    Salinas, Stephanie A.

    2010-08-01T23:59:59.000Z

    The purpose of the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Management System (EMS) is identification of environmental consequences from SNL/NM activities, products, and/or services to develop objectives and measurable targets for mitigation of any potential impacts to the environment. This Source Document discusses the annual EMS process for analysis of environmental aspects and impacts and also provides the fiscal year (FY) 2010 analysis. Further information on the EMS structure, processes, and procedures are described within the programmatic EMS Manual (PG470222).

  7. Energy management system functions in deregulated power systems 

    E-Print Network [OSTI]

    Magnago, Fernando Hugo

    1997-01-01T23:59:59.000Z

    observability 37 38 vu CHAPTER Page 1. Numerical examples: Finding the essential measurements 41 a. IEEE 14-bus system b. IEEE 30-bus system C. Measurement placement against single line outages 1. Preliminary calculations 2. Measurement placement... 79 81 Page APPENDIX E 91 VITA 95 LIST OF TABLES TABLE Page I 13-bus test system: Variation of PS for INJ 7 with changes in local redundancy. 22 II IEEE 57-bus system: Variation of PS for INJ 13 with changes in local redundancy. 24 III IEEE...

  8. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-05-06T23:59:59.000Z

    The Guide supports the Departments initiatives to improve program, project, and contract management through the implementation and surveillance of contractors earned value management systems. Canceled by DOE G 413.3-10A.

  9. Automated Transportation Management System (ATMS) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy's (DOE's) Automated Transportation Management System is an integrated web-based logistics management system allowing users to manage inbound and outbound freight...

  10. Hopper compilers and DDT short outage next Wed, May 16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    compilers and DDT short outage next Wed, May 16 Hopper compilers and DDT short outage next Wed, May 16 May 10, 2012 (0 Comments) Due to a scheduled maintenance for the License...

  11. Cryptographic Key Management System

    SciTech Connect (OSTI)

    No, author

    2014-02-21T23:59:59.000Z

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene#12;ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  12. SAMPLE RESULTS FROM MCU SOLIDS OUTAGE

    SciTech Connect (OSTI)

    Peters, T.; Washington, A.; Oji, L.; Coleman, C.; Poirier, M.

    2014-09-22T23:59:59.000Z

    Savannah River National Laboratory (SRNL) has received several solid and liquid samples from MCU in an effort to understand and recover from the system outage starting on April 6, 2014. SRNL concludes that the presence of solids in the Salt Solution Feed Tank (SSFT) is the likely root cause for the outage, based upon the following discoveries ? A solids sample from the extraction contactor #1 proved to be mostly sodium oxalate ? A solids sample from the scrub contactor#1 proved to be mostly sodium oxalate ? A solids sample from the Salt Solution Feed Tank (SSFT) proved to be mostly sodium oxalate ? An archived sample from Tank 49H taken last year was shown to contain a fine precipitate of sodium oxalate ? A solids sample from the extraction contactor #1 drain pipe from extraction contactor#1 proved to be mostly sodium aluminosilicate ? A liquid sample from the SSFT was shown to have elevated levels of oxalate anion compared to the expected concentration in the feed Visual inspection of the SSFT indicated the presence of precipitated or transferred solids, which were likely also in the Salt Solution Receipt Tank (SSRT). The presence of the solids coupled with agitation performed to maintain feed temperature resulted in oxalate solids migration through the MCU system and caused hydraulic issues that resulted in unplanned phase carryover from the extraction into the scrub, and ultimately the strip contactors. Not only did this carryover result in the Strip Effluent (SE) being pushed out of waste acceptance specification, but it resulted in the deposition of solids into several of the contactors. At the same time, extensive deposits of aluminosilicates were found in the drain tube in the extraction contactor #1. However it is not known at this time how the aluminosilicate solids are related to the oxalate solids. The solids were successfully cleaned out of the MCU system. However, future consideration must be given to the exclusion of oxalate solids into the MCU system. There were 53 recommendations for improving operations recently identified. Some additional considerations or additional details are provided below as recommendations. ? From this point on, IC-Anions analyses of the DSSHT should be part of the monthly routine analysis in order to spot negative trends in the oxalate leaving the MCU system. Care must be taken to monitor the oxalate content to watch for sudden precipitation of oxalate salts in the system. ? Conduct a study to optimize the cleaning strategy at ARP-MCU through decreasing the concentration or entirely eliminating the oxalic acid. ? The contents of the SSFT should remain unagitated. Routine visual observation should be maintained to ensure there is not a large buildup of solids. As water with agitation provided sufficient removal of the solids in the feed tank, it should be considered as a good means for dissolving oxalate solids if they are found in the future. ? Conduct a study to improve prediction of oxalate solubility in salt batch feed materials. As titanium and mercury have been found in various solids in this report, evaluate if either element plays a role in oxalate solubility during processing. ? Salt batch characterization focuses primarily on characterization and testing of unaltered Tank 21H material; however, non-typical feeds are developed through cleaning, washing, and/or sump transfers. As these solutions are processed through MCU, they may precipitate solids or reduce performance. Salt batch characterization and testing should be expanded to encompass a broader range of feeds that may be processed through ARPMCU.

  13. Computerized training management system

    DOE Patents [OSTI]

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04T23:59:59.000Z

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  14. Computerized training management system

    DOE Patents [OSTI]

    Rice, Harold B. (Franklin Furnace, OH); McNair, Robert C. (East Setauket, NY); White, Kenneth (Shirley, NY); Maugeri, Terry (Wading River, NY)

    1998-08-04T23:59:59.000Z

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  15. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13T23:59:59.000Z

    This Guide provides approaches for implementing the Earned Value Management System (EVMS) requirements of DOE O 413.3B. Cancels DOE G 413.3-10.

  16. MANAGEMENT CONTROL SYSTEM IN PUBLIC

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    essential aspect of the public management device: compliance with legal rules. Gradually, a new objective of the budgetary system. Thus, public organizations need to create new tools to manage their activities or use, despite the number of reforms adopted in the name of New Public Management, numerous authors also noted

  17. A Preliminary Analysis of Network Outages During Hurricane Sandy

    E-Print Network [OSTI]

    Heidemann, John

    A Preliminary Analysis of Network Outages During Hurricane Sandy USC/ISI Technical Report ISI outages during the October 2012 Hurricane Sandy. We assess net- work reliability by pinging a sample network outages, we see that the out- age rate in U.S. networks doubled when the hurricane made landfall

  18. Sandia National Laboratories: electricity outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Microgrid, Modeling & Analysis, News, News & Events, Partnership, Renewable Energy, SMART Grid, Systems Analysis, Systems Engineering Mayor Says New System Will 'Keep Everyone...

  19. Fuel cell gas management system

    DOE Patents [OSTI]

    DuBose, Ronald Arthur (Marietta, GA)

    2000-01-11T23:59:59.000Z

    A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

  20. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07T23:59:59.000Z

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  1. Coordinated Beamforming for Multiuser MISO Interference Channel under Rate Outage Constraints

    E-Print Network [OSTI]

    Li, Wei-Chiang; Lin, Che; Chi, Chong-Yung

    2011-01-01T23:59:59.000Z

    This paper studies the coordinated beamforming design problem for the multiple-input single-output (MISO) interference channel, assuming only channel distribution information (CDI) at the transmitters. For a given requirement on the rate outage probability for receivers, we aim to maximize the system utility (e.g., the weighted sum rate, weighted proportional fairness rate, and the weighed harmonic mean rate) subject to the rate outage constraints and individual power constraints. The outage constraints, however, lead to a complicated, nonconvex structure for the considered beamforming design problem and make the optimization problem difficult to handle. While this nonconvex optimization problem can be solved in an exhaustive search manner, this brute-force approach is only feasible when the number of transmitter-receiver pairs is small. For a system with a large number of transmitter-receiver pairs, computationally efficient alternatives are necessary. The focus of this paper is hence on the design of such e...

  2. Building International Emergency Management Systems | National...

    National Nuclear Security Administration (NNSA)

    Building International Emergency Management Systems | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  3. Joint Power Control and Beamforming Codebook Design for MISO Channels under the Outage

    E-Print Network [OSTI]

    Yu, Wei

    Joint Power Control and Beamforming Codebook Design for MISO Channels under the Outage Criterion and beamforming codebooks for limited-feedback multiple-input single-output (MISO) wireless systems. The problem focuses on optimal design of single-user limited-feedback systems over multiple-input single-output (MISO

  4. Outage Constrained Robust Transmit Optimization for Multiuser MISO Downlinks: Tractable Approximations by Conic Optimization

    E-Print Network [OSTI]

    Wang, Kun-Yu; Chang, Tsung-Hui; Ma, Wing-Kin; Chi, Chong-Yung

    2011-01-01T23:59:59.000Z

    In this paper we consider a probabilistic signal-to-interference and-noise ratio (SINR) constrained problem for transmit beamforming design in the presence of imperfect channel state information (CSI), under a multiuser multiple-input single-output (MISO) downlink scenario. In particular, we deal with outage-based quality-of-service constraints, where the probability of each user's SINR not satisfying a service requirement must not fall below a given outage probability specification. The study of solution approaches to the probabilistic SINR constrained problem is important because CSI errors are often present in practical systems and they may cause substantial SINR outages if not handled properly. However, a major technical challenge is how to process the probabilistic SINR constraints. To tackle this, we propose a novel relaxation- restriction (RAR) approach, which consists of two key ingredients-semidefinite relaxation (SDR), and analytic tools for conservatively approximating probabilistic constraints. Th...

  5. IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--II: EXPRESS BRIEFS, VOL. 55, NO. 9, SEPTEMBER 2008 927 Using Transmission Line Outage Data to

    E-Print Network [OSTI]

    Dobson, Ian

    IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--II: EXPRESS BRIEFS, VOL. 55, NO. 9, SEPTEMBER 2008 927 System Hui Ren, Student Member, IEEE, and Ian Dobson, Fellow, IEEE Abstract--We study cascading­Watson branching process model of cascading failure. Index Terms--Failure analysis, power systems, reliability

  6. A 17025:2005A 17025:2005 Management SystemManagement System

    E-Print Network [OSTI]

    A 17025:2005A 17025:2005 Management SystemManagement System Made SimpleMade Simple What to think about when reviewingWhat to think about when reviewing the Management Systemthe Management System #12 role does top management play?le does top management play? Technical Manager/Quality Manager

  7. Integrated Safety Management System Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-11-01T23:59:59.000Z

    This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

  8. Fuel Cell Systems Air Management

    E-Print Network [OSTI]

    Air Management Honeywell TIAX UTC Mechanology, LLC · Turbocompressor for PEM Fuel Cells · Hybrid-Machined Thin Film H2 Gas Sensors - ATMI · Sensor Development for PEM Fuel Cell Systems ­ Honeywell · Gallium

  9. Steam System Forecasting and Management

    E-Print Network [OSTI]

    Mongrue, D. M.; Wittke, D. O.

    1982-01-01T23:59:59.000Z

    '. This and the complex and integrated nature of the plants energy balance makes steam system forecasting and management essential for optimum use of the plant's energy. This paper discusses the method used by Union carbide to accomplish effective forecasting...

  10. Power Outage 1. Remain Calm; provide assistance to others if necessary.

    E-Print Network [OSTI]

    Hickman, Mark

    Power Outage 1. Remain Calm; provide assistance to others if necessary. 2. Report the outage, call. Campus-wide telephone communications will continue to operate during a power outage on standard phones. If emergency assistance is required, call UC Security on Extn 6111 and state "POWEr OUTAgE" or mobile 0800 823

  11. Power Line Damage, Electrical Outages Reduced in the ''Sleet Belt'': NICE3 Steel Project Fact Sheet

    SciTech Connect (OSTI)

    NONE

    2000-04-25T23:59:59.000Z

    The AR Windamper System was developed through a grant from the Inventions and Innovation Program, to protect power transmission lines in sleet belt states and provinces by eliminating the ''galloping'' phenomenon. Wind damping products minimize power outages and reduce repair costs to transmission lines.

  12. Optimal Power Control in CDMA Networks with Constraints on Outage Probability

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    power control al- gorithm is developed for large systems of users. Simulation results are presented of this previous work deals with invariant channel models. Any power control scheme that attempts to follow fastOptimal Power Control in CDMA Networks with Constraints on Outage Probability John Papandriopoulos

  13. Demil planning and management system

    SciTech Connect (OSTI)

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C. [Argonne National Lab., IL (United States); Golden, R.E. [Army Pacific, Fort Shafter, HI (United States); Fuller, R. [Army Industrial Operations Command, Rock Island, IL (United States). National Maintenance Point Branch

    1997-08-01T23:59:59.000Z

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  14. Information Security Management System for Microsoft's Cloud Infrastructure

    E-Print Network [OSTI]

    Chaudhuri, Surajit

    Information Security Management System for Microsoft's Cloud Infrastructure Online Services ......................................................................................................................................................................................1 Information Security Management System.......................................................................................................................7 Information Security Management Forum

  15. Towards CORBAbased Enterprise Management: Managing CORBAbased Systems with SNMP Platforms

    E-Print Network [OSTI]

    of different management architectures. The aim of the work described in this paper con­ sists in helping1 Towards CORBA­based Enterprise Management: Managing CORBA­based Systems with SNMP Platforms, CA, USA, November 1998 Abstract--- Apart from the well established OSI/TMN and Internet management

  16. Heating System Modernization, Management of Peripheral Scope...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA, Dec 2010 Heating System Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA,...

  17. Implementing a Corporate Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System" Steve Schultz Corporate Energy Manager 3M Presented at the U.S. Department of Energy Industrial Technologies Program June 3, 2010...

  18. Electricity Case: Statistical Analysis of Electric Power Outages

    E-Print Network [OSTI]

    Wang, Hai

    Electricity Case: Statistical Analysis of Electric Power Outages CREATE Report Jeffrey S. Simonoff: Statistical Analysis of Electric Power Outages CREATE Report July 26, 2005 Jeffrey S. Simonoff (NYU of the United States Department of Homeland Security. #12;0 Electricity Case, Report 3 Electricity Case

  19. Does Beamforming achieve Outage Capacity with Direction Feedback?

    E-Print Network [OSTI]

    Jafar, Syed A.

    Does Beamforming achieve Outage Capacity with Direction Feedback? Sudhir Srinivasa and Syed Ali Jafar Sriram Vishwanath Electrical Engineering and Computer Science Electrical and Computer Engineering: syed@ece.uci.edu, sudhirs@uci.edu Email: sriram@ece.utexas.edu Abstract We explore the outage capacity

  20. Outage behavior with delay and CSIT Dinesh Rajan

    E-Print Network [OSTI]

    Rajan, Dinesh

    Outage behavior with delay and CSIT Dinesh Rajan Department of electrical engineering Southern of electrical and computer engineering Rice University, Houston, Texas. ashu@rice.edu, aaz@rice.edu Abstract-- In this paper, we demonstrate that the packet outage probability for fading channels can be significantly

  1. Thermal management systems and methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2006-12-12T23:59:59.000Z

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  2. Systems and Services Outage Notification Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening a solid ...SuccessSurprisingSynchrotronsPlasma Physics Bioenergy

  3. COKEMASTER: Coke plant management system

    SciTech Connect (OSTI)

    Johanning, J.; Reinke, M. [Krupp Koppers GmbH, Essen (Germany)

    1996-12-31T23:59:59.000Z

    To keep coke utilization in ironmaking as competitive as possible, the potential to improve the economics of coke production has to be utilized. As one measure to meet this need of its customers, Krupp Koppers has expanded its existing ECOTROL computer system for battery heating control to a comprehensive Coke Plant Management System. Increased capacity utilization, lower energy consumption, stabilization of plant operation and ease of operation are the main targets.

  4. Metrics for border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2009-07-01T23:59:59.000Z

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  5. Survey Research Methodology in Management Information Systems: An Assessment

    E-Print Network [OSTI]

    Pinsonneault, Alain; Kraemer, Kenneth L.

    1993-01-01T23:59:59.000Z

    Management. 181-186. A survey. Management the impact onskill requirements: A survey. Management Information SystemsManagement Information Systems Research Challenge: Survey

  6. MIT System Design and Management Program

    E-Print Network [OSTI]

    de Weck, Olivier L.

    , disseminating, and preserving knowledge, and to working with others to bring this knowledge to bear on the worldMIT System Design and Management Program MIT System Design and Management Program Leadership, innovation, systems thinking #12;MIT System Design and Management Program #12;about MIT The mission of MIT

  7. Enterprise Storage Management System Dan Glasser1

    E-Print Network [OSTI]

    Fayad, Mohamed

    Enterprise Storage Management System Dan Glasser1 , Madeline Hardojo1 , Anand Sundaram1 , Nate.fayad@sjsu.edu Abstract: Enterprise Storage Management System is an interactive and user-friendly program that will enable the Lincoln Telephone Company to efficiently manage their storage system. With this system, the Lincoln

  8. Environmental Management System `We are implementing an

    E-Print Network [OSTI]

    in our Environmental Policy Statement. Specifically we will: · Comply with relevant environmental. · Publishing an environmental policy which sets out our key targets (see opposite). · EstablishingEnvironmental Management System `We are implementing an Environmental Management System to address

  9. Management information systems software evaluation

    SciTech Connect (OSTI)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01T23:59:59.000Z

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  10. CERTIFICATE OF REGISTRATION Quality Management Systems

    E-Print Network [OSTI]

    Rodriguez, Carlos

    CERTIFICATE OF REGISTRATION Quality Management Systems INDIAN AGRICULTURAL STATISTICS RESEARCH Certifications Limited Certifies that the Management System of the above mentioned Company has been assessed and meets the requirements established by the following rules: ISO 9001 :2008 The Management System Includes

  11. Integrated Building Management System (IBMS)

    SciTech Connect (OSTI)

    Anita Lewis

    2012-07-01T23:59:59.000Z

    This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

  12. System safety management lessons learned

    SciTech Connect (OSTI)

    Piatt, J.A.

    1989-05-01T23:59:59.000Z

    The Assistant Secretary of the Army for Research, Development and Acquisition directed the Army Safety Center to provide an audit of the causes of accidents and safety of use restrictions on recently fielded systems by tracking residual hazards back through the acquisition process. The objective was to develop ''lessons learned'' that could be applied to the acquisition process to minimize mishaps in fielded systems. System safety management lessons learned are defined as Army practices or policies, derived from past successes and failures, that are expected to be effective in eliminating or reducing specific systemic causes of residual hazards. They are broadly applicable and supportive of the Army structure and acquisition objectives. 29 refs., 7 figs.

  13. Distrbuted Sensing Systems for Water Quality Assesment and Management

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    Sensing Systems for Water Quality Assessment and ManagementSensing Systems for Water Quality Assessment and ManagementSensing Systems for Water Quality Assessment and Management

  14. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS...

  15. Sandia National Laboratories: Carbon Management Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Systems Models Publications Questions WECSsim Model The Water, Energy and Carbon Sequestration Model (WECSsim): A Collaborative Systems Model The Water, Energy and...

  16. Integrated Vehicle Thermal Management Systems (VTMS) Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems (VTMS) AnalysisModeling Integrated Vehicle Thermal Management Systems (VTMS) AnalysisModeling 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit...

  17. Contract Management Using Industrial Energy Management & Reporting Systems

    E-Print Network [OSTI]

    Robinson, J. E.

    2011-01-01T23:59:59.000Z

    Energy Management and Reporting Systems (EMRS) are rule-based control systems with a record of reducing energy usage and CO2e emissions while optimizing electrical generation in a real time environment. The rule set successfully optimizes energy...

  18. Integrated Project Management System description

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    The Integrated Program Management System (IPMS) Description is a ``working`` document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ``why`` and ``what is expected`` is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately.

  19. 2011 IBM Corporation Computer system energy management

    E-Print Network [OSTI]

    Shi, Weisong

    level EnergyScale Microcontroller IBM Systems Director · Policy management · Power & performance© 2011 IBM Corporation Computer system energy management Charles Lefurgy 28 July 2011 #12;© 2011 IBM Corporation2 Outline A short history of server power management POWER7 EnergyScale AMESTER power

  20. Facing Complexity in Systems Management Metin Feridun

    E-Print Network [OSTI]

    Boyer, Edmond

    . This keynote will survey some of these systems management issues and the emerging approaches to solving themFacing Complexity in Systems Management Metin Feridun IBM Research -- Zurich Säumerstrasse 4 CH to the Internet, are creating new and exciting challenges to the management of IT (Information Technology

  1. CIS 330: Database Management Systems Course Number & Title (A.1) CIS 330: Database Management Systems

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    CIS 330: Database Management Systems Course Number & Title (A.1) CIS 330: Database Management & Johannes Gehrke, Database Management Systems (third edition), McGraw Hill. Additional materials as handouts, e.g., research papers Catalog Description (A.5a) Introduction to database management systems

  2. Integrated Brush Management Systems for Texas

    E-Print Network [OSTI]

    Hanselka, C. Wayne; Hamilton, Wayne T.; Rector, Barron S.

    2001-01-04T23:59:59.000Z

    Integrated Brush Management Systems (IBMS) involve careful analysis of range resources and ranch goals in order to develop solutions to brush problems. Successful use of IBMS should result in improved management processes and greater profitability...

  3. Project management plan for Contract Management Information System (CONTRACT)

    SciTech Connect (OSTI)

    Severud, K.J.

    1995-01-27T23:59:59.000Z

    The office of the Vice President of A/E Construction for ICF Kaiser has requested that OSHA compliance statistics be made available to management for companies subcontracting to the ICF Kaiser Company. In addition, a need to better manage contract administrative data for the Contracts Administration and the Construction Management Projects organizations has been identified. The Contract Management Information System is being developed to achieve these objectives. This document provides a Project Management Plan for development of the Contract Management Administration System (CONTRACT) by Design Services DAD/CAE Support. The Project Management Plan describes the project work breakdown structure, safety and quality considerations, with associated cost, schedule and project management information. The CONTRACT System is intended to aid the ICF Kaiser divisions with tracking of A/E subcontractor information to include general contract administration information used by the Contracts Administration organization, contract and safety performance data used by the Construction Management Projects and office of the organization and Vice President of A/E Construction.

  4. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect (OSTI)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20T23:59:59.000Z

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  5. A model for international border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2008-09-01T23:59:59.000Z

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  6. Integrating Environmental, Safety, and Quality Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    registrationvalidation of management systems is desirableUT-Battelle registrations ISO 9001 for isotope development process ISO 14001 for all UT-Battelle activities OHSAS...

  7. Open Source Course Management and Assessment System

    E-Print Network [OSTI]

    LON-CAPA: Open Source Course Management and Assessment System Gerd Kortemeyer Michigan State, homework problems) is a lot of work · Doing so for use in just one course is a waste of time and effort Assembly Course Management Resource Assembly Course Management #12;Campus A Campus B Resource Assembly

  8. Computerized dairy records management systems

    E-Print Network [OSTI]

    Acosta, Alejandro E. Gonzalez

    1992-01-01T23:59:59.000Z

    . . . . . . 1. 3. Management Tools. . . . . . . . . . . . . . . . . . . . . . 1. 3. 1. Record Keeping History. . . . . . . . . . . . . . . . . . . . . . . . . . . 3 . . . . . . . 3 . . . . . 3 . . . . . . . 4 4 . . . . . . . 5 1. 3. 2. Hand-Kept v. s.... Computerized Records. . . . . . . . . . . 6 1. 3. 3. Direct Access to Records by Telephone. . . . . . . . . 6 II. HEIFER MANAGEMENT. 2. 1. Dairy Replacements. . 2. 2. Heifers Breeding Management . . . . . . . . . . . 7 . . . . . . . 7 . . . . . . . 8...

  9. Abstract--Distribution factors play a key role in many system security analysis and market applications. The injection shift

    E-Print Network [OSTI]

    for and the computationally efficient evaluation of LODFs under multiple- line outages. Index Terms--power transfer distribution factors, line outage distribution factors, multiple-line outages, system security. I. INTRODUCTION. Given the usefulness of LODFs in the study of security with many outaged lines, such as in blackouts

  10. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-20T23:59:59.000Z

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  11. Lassoing Line Outages in the Smart Power Grid

    E-Print Network [OSTI]

    Zhu, Hao

    2011-01-01T23:59:59.000Z

    Fast and accurate unveiling of power line outages is of paramount importance not only for preventing faults that may lead to blackouts, but also for routine monitoring and control tasks of the smart grid, including state estimation and optimal power flow. Existing approaches are either challenged by the \\emph{combinatorial complexity} issues involved, and are thus limited to identifying single- and double-line outages; or, they invoke less pragmatic assumptions such as \\emph{conditionally independent} phasor angle measurements available across the grid. Using only a subset of voltage phasor angle data, the present paper develops a near real-time algorithm for identifying multiple line outages at the affordable complexity of solving a quadratic program via block coordinate descent iterations. The novel approach relies on reformulating the DC linear power flow model as a \\emph{sparse} overcomplete expansion, and leveraging contemporary advances in compressive sampling and variable selection using the least-abso...

  12. Fermilab | FRA Contractor Assurance System (CAS) | Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    M8) Quality 1.0 Purpose 2.0 Roles and Responsibilities 3.0 Management System Operation 4.0 References 5.0 Processes Supporting System 6.0 Reviews, Audits and Reports Quality...

  13. PV Integration by Building Energy Management System

    E-Print Network [OSTI]

    Boyer, Edmond

    stands for any variable that could be PV, grid power, or load power if calculation is valid for allPV Integration by Building Energy Management System Rim.Missaouią, Ghaith.Warkozeką, Seddik. BachaLab.grenoble-inp.fr Abstract- This paper focuses on Energy Management System (EMS) applied to the residential sector. The EMS

  14. IEEE COMMUNICATIONS LETTERS, VOL. 17, NO. 1, JANUARY 2013 127 Capacity of Zero-Outage Scheme

    E-Print Network [OSTI]

    Candan, Cagatay

    IEEE COMMUNICATIONS LETTERS, VOL. 17, NO. 1, JANUARY 2013 127 Capacity of Zero-Outage Scheme Under Imprecise Channel State Information C¸ a~gatay Candan Abstract--The capacity of zero-outage scheme-to-noise-ratio fluctuates and the scheme suffers from com- munication outages. Exact analytical expressions characterizing

  15. Automated Transportation Management System (ATMS)

    Office of Environmental Management (EM)

    s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al...

  16. Proof of the outage probability conjecture for MISO channels

    E-Print Network [OSTI]

    Abbe, Emmanuel; Telatar, Emre

    2011-01-01T23:59:59.000Z

    In Telatar 1999, it is conjectured that the covariance matrices minimizing the outage probability for MIMO channels with Gaussian fading are diagonal with either zeros or constant values on the diagonal. In the MISO setting, this is equivalent to conjecture that the Gaussian quadratic forms having largest tale probability correspond to such diagonal matrices. We prove here the conjecture in the MISO setting.

  17. Collaboration Surfaces for Outage Control Centers Lars Hurlen

    E-Print Network [OSTI]

    Deussen, Oliver

    , particularly for the nuclear and petroleum domains where the overall complexity, safety concerns and challengesCollaboration Surfaces for Outage Control Centers Lars Hurlen Institute for Energy Technology Os Allé 7 1777 Halden, Norway +47 69212242 lars.hurlen@hrp.no Bojana Petkov Institute for Energy

  18. Outage Probability Analysis of Distributed Reception with Hard Decision Exchanges

    E-Print Network [OSTI]

    Brown III, Donald R.

    Outage Probability Analysis of Distributed Reception with Hard Decision Exchanges Rui Wang, D. Richard Brown III, Min Ni Dept. of Electrical and Computer Eng. Worcester Polytechnic Institute 100 Institute Rd, Worcester, MA 01609 Email: {rwang,drb,minni@wpi.edu} Upamanyu Madhow Dept. of Electrical

  19. Management issues for high performance storage systems

    SciTech Connect (OSTI)

    Louis, S. [Lawrence Livermore National Lab., CA (United States); Burris, R. [Oak Ridge National Lab., TN (United States)

    1995-03-01T23:59:59.000Z

    Managing distributed high-performance storage systems is complex and, although sharing common ground with traditional network and systems management, presents unique storage-related issues. Integration technologies and frameworks exist to help manage distributed network and system environments. Industry-driven consortia provide open forums where vendors and users cooperate to leverage solutions. But these new approaches to open management fall short addressing the needs of scalable, distributed storage. We discuss the motivation and requirements for storage system management (SSM) capabilities and describe how SSM manages distributed servers and storage resource objects in the High Performance Storage System (HPSS), a new storage facility for data-intensive applications and large-scale computing. Modem storage systems, such as HPSS, require many SSM capabilities, including server and resource configuration control, performance monitoring, quality of service, flexible policies, file migration, file repacking, accounting, and quotas. We present results of initial HPSS SSM development including design decisions and implementation trade-offs. We conclude with plans for follow-on work and provide storage-related recommendations for vendors and standards groups seeking enterprise-wide management solutions.

  20. A Systems Approach to Managing Oil

    E-Print Network [OSTI]

    van Dorp, Johan René

    A Systems Approach to Managing Oil Transportation Risk in Prince William Sound Jason R. W. Merrick Received April 21, 2000; revised June 12, 2000; accepted June 26, 2000MANAGING OIL TRANSPORTATION RISK about the safety of oil transportation in the Prince William Sound, Alaska. As a result, a large number

  1. Wie beantrage ich das Zertifikat ,,Quality System Manager Junior"

    E-Print Network [OSTI]

    Berlin,Technische Universität

    Wie beantrage ich das Zertifikat ,,Quality System Manager Junior" und was kostet es Jochem DGQ Quality System Manager - Junior - Die Zusatzqualifikation für Studierende der Technischen Universität Berlin #12;Was ist der Quality Systems Manager - Junior -? Die Bedeutung des Qualitätsmanagements

  2. Methods of forming thermal management systems and thermal management methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2012-06-05T23:59:59.000Z

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  3. Introducing Energy Management Systems into Smaller Facilities

    E-Print Network [OSTI]

    Lawrence, J. A.

    1983-01-01T23:59:59.000Z

    INTRODUCING ENERGY MANAGEMENT SYSTEMS INTO SMALLER FACILITIES John A. Lawrence Tenneco Inc. Houston, Texas ABSTRACT Many small and medium sized commercial buildings are energy hogs. Typically they were designed and built to meet low first...

  4. Rule-Based Energy Management System

    E-Print Network [OSTI]

    Thomasson, F. Y.; Childress, R. L.

    Real time pricing of electricity and rising fossil fuel costs are causing renewed interest in energy management systems (EMS). This paper describes a rule-based EMS which has been implemented at several large industrial powerhouses. It is a PC...

  5. Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-29T23:59:59.000Z

    The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Cancels and supersedes DOE G 450.4-1B and DOE G 450.3-3.

  6. Outage Rate Regions for the MISO Interference Channel: Definitions and Interpretations

    E-Print Network [OSTI]

    Lindblom, Johannes; Larsson, Erik G

    2011-01-01T23:59:59.000Z

    We consider the slow-fading two-user multiple-input single-output (MISO) interference channel (IC), where the receivers treat the interference as additive Gaussian noise. We study the rate points that can be achieved, allowing a non-zero outage probability. The points which meet the outage probability specification constitute a so-called outage rate region. There exist several definitions of the outage rate regions for the IC, as for the broadcast and the multiple-access channels. We give four definitions for the outage region of the MISO IC. The definitions differ on whether the rates are declared in outage jointly or individually and whether there is instantaneous or statistical channel state information (CSI) at the transmitters. For the statistical CSI scenario, we discuss how to find the outage probabilities in closed form. We provide interpretations of the definitions and compare the corresponding regions via analytical and numerical results.

  7. Composition of Management System for Smart Homes

    E-Print Network [OSTI]

    Levin, Mark Sh; Klapproth, Alexander

    2011-01-01T23:59:59.000Z

    The paper addresses modular hierarchical design (composition) of a management system for smart homes. The management system consists of security subsystem (access control, alarm control), comfort subsystem (temperature, etc.), intelligence subsystem (multimedia, houseware). The design solving process is based on Hierarchical Morphological Multicriteria Design (HMMD) approach: (1) design of a tree-like system model, (2) generation of design alternatives for leaf nodes of the system model, (3) Bottom-Up process: (i) multicriteria selection of design alternatives for system parts/components and (ii) composing the selected alternatives into a resultant combination (while taking into account ordinal quality of the alternatives above and their compatibility). A realistic numerical example illustrates the design process of a management system for smart homes.

  8. Integrated Safety Management System as the Basis for Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development Integrated Safety Management System as the Basis for Work Planning and...

  9. Concept for Management of the Future Electricity System (Smart...

    Open Energy Info (EERE)

    Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark...

  10. Earned Value Management System (EVMS) and Project Analysis Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)- March 2014 Earned Value Management System (EVMS) and Project Analysis Standard...

  11. Security Analysis and Project Management Systems | ornl.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Analysis and Project Management Systems SHARE Security Analysis and Project Management Systems ORNL brings together the subject matter experts with programmers to design,...

  12. Energy Management and Information Systems Study - 2014 BTO Peer...

    Energy Savers [EERE]

    Management and Information Systems Study - 2014 BTO Peer Review Energy Management and Information Systems Study - 2014 BTO Peer Review Presenter: Jessica Granderson, Lawrence...

  13. Department of Energy Project Management System

    SciTech Connect (OSTI)

    Not Available

    1981-01-08T23:59:59.000Z

    This manual provides guidance to all appropriate personnel for implementation of DOE Project Management Policy. It sets forth the principles and requirements that govern the development, approval, and execution of DOE's outlay programs as embodied within the Project Management System (PMS). Its primary goal is to assure application of sound management principles providing a disciplined, systematic, and coordinated approach resulting in efficient planning, organization, coordination, budgeting, management, review, and control of DOE projects. The provisions of this manual are mandatory for the Department's Major Systems Acquisitions (MSA's) and Major Projects and will be used for other projects to the extent practicable. Department's project-management task is over 250 projects, with a total estimated cost in excess of $24 billion at completion. This diverse array of project activities requires a broad spectrum of scientific, engineering, and management skills to assure that they meet planned technical and other objectives and are accomplished on schedule, within cost and scope, and that they serve the purposes intended. In recognition of these requirements and the Department's ever-increasing magnitude of responsibilities, an interim Project Management System was established and has been in use for over a year. This manual constitutes an update of the system based on the experience gained and lessons learned during this initial period.

  14. The design and implementation of the buffer manager for an experimental relational database management system

    E-Print Network [OSTI]

    Li, Zaichun

    1994-01-01T23:59:59.000Z

    Buffer management is an essential component of database management. This thesis presents a design and implementation of the buffer manager for an experimental relational database management system. The relationship and difference between database...

  15. Seamless Energy Management Systems Part I: Assessment of Energy

    E-Print Network [OSTI]

    Seamless Energy Management Systems Part I: Assessment of Energy Management Systems and Key to Engineer the Future Electric Energy System #12;#12;Seamless Energy Management Systems Part I: Assessment of Energy Management Systems and Key Technological Requirements Final Project Report Project Faculty Team

  16. Quality Management and Job Quality: How the ISO 9001 Standard forQuality Management Systems Affects Employees and Employers

    E-Print Network [OSTI]

    Levine, David I.; Toffel, Michael W.

    2008-01-01T23:59:59.000Z

    of IS0 9000 quality management systems on manufacturing.Standard for Quality Management Systems Affects Employeeshow the ISO 9001 Quality Management System standard affects

  17. Delivering Document Management Systems Through the ASP Model

    E-Print Network [OSTI]

    Furht, Borko

    Delivering Document Management Systems Through the ASP Model Borko Furht, Florida Atlantic, Boca Raton, Florida Introduction Electronic Document Management Systems (DMS) are commercial off and short records, such as name, address, account number, and social security number. Document management

  18. Efficient Management of Idleness in Storage Systems

    E-Print Network [OSTI]

    Smirni, Evgenia

    -off between the performance of fore- ground and background tasks. As a result, the storage system is better4 Efficient Management of Idleness in Storage Systems NINGFANG MI College of William and Mary ALMA of storage sys- tems are scheduled with low priority and served during idle times. Under such conditions

  19. Sanitary Sewer System Management Plan

    E-Print Network [OSTI]

    Contract Number DE- AC02-05CH11231 #12;#12;LBNL SSMP TABLE OF CONTENTS SSMP Section Tab / Page # Section 0 0-1: LBNL CIWQS Sewer System Questionnaire Attachment 0-2: LBNL Facility Sanitary Sewer Collection System Overview Map Section i: Goals None Section ii: Organization Attachment ii-1: LBNL Notice of Intent

  20. Vol 2, Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-05-27T23:59:59.000Z

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1B.

  1. Strategic Planning System for Exotic Game Management

    E-Print Network [OSTI]

    Lubbering, Jeanne Marie Petrofes

    1988-01-01T23:59:59.000Z

    STRATEGIC PLANNING SYSTEM FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Submitted to the Office of Graduate Studies of Texas ASM University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE December 1988 Major Subject: Range Science STRATEGIC PLANNING FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Approved as to style and content by: J ry W. uth (Ch ir of Committee) Steve Archer (Member) Duane C...

  2. Database Management Systems 3ed, R. Ramakrishnan and J. Gehrke 1 Database Management Systems

    E-Print Network [OSTI]

    Li, Yanjun "Lisa"

    What Is a DBMS? A database is a collection of data. Models real-world enterprise, e.g. university System (DBMS) is a software package designed to store and manage databases. #12;Database Management Systems 3ed, R. Ramakrishnan and J. Gehrke 3 Why we need DBMS Huge amount of data is available. Users need

  3. Improving Mission Execution by Integrating our Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-03T23:59:59.000Z

    Request for analysis and preliminary set of alternatives for the integration of management systems within DOE.

  4. IBM Systems Director Active Energy Manager Installation and User's Guide

    E-Print Network [OSTI]

    instructions for using IBM® Systems Director Active Energy Manager software to monitor and manage where powerIBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;#12;IBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;ii IBM Systems

  5. Managing power system security and optimization

    SciTech Connect (OSTI)

    O'Grady, M.J. (Potomac Electric Power Co., Washington, DC (United States)); Briggs, W.T.; Stadlin, W.O.

    1994-10-01T23:59:59.000Z

    Power system control objectives of energy management systems (EMSs) are well defined and understood: reliability, security, and optimization. However, the approaches to achieving these objectives have often resulted in disjointed solutions and poor acceptance by system operators. This article describes how the new PEPCO EMS provides unique system-wide (generation, transmission, distribution) security and optimization strategies via a coordinated suite of real-time closed-loop control functions. System operators played a key role in defining the application features and user interfaces, ensuring correct operating practices.

  6. Power line damage, electrical outages, reduced in the {open_quotes}sleet belt{close_quotes}

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    Companies that depend on reliable supplies of electricity, as well as electrical utilities, need to defend against weather-related damage and power outages. Weather-related damage claims in the U.S. totaled $16 billion during the ten-year span from 1980 through 1989 and have already reached $48 billion in the first five years of this decade, evidence that climate change could be causing more severe storms. This makes technology that minimizes weather damage all the more welcome. Ice and snow build-up on high-voltage electric power lines in a moderate to high winds causes high-amplitude low-frequency mechanical vibrations, called galloping. When power lines react aero-elastically to these conditions, undamped vibration tears apart transmission towers and fittings or propels lines into each other, shorting out large circuits. Besides causing costly electric system outages and structural damage, this dramatic phenomenon steals power through higher electricity line losses that occur when other conductors have to carry more power to compensate for a tripped or damaged line. In a 1981 survey, 17 of 38 utilities reported that galloping was a moderate to severe problem, and 11 reported that they had a galloping event at least once a year. Fifty-seven percent of the incidents included flashover, and 60% included structural damage.

  7. Draft!07"18"2011! 1 Turning the Tide on Outages1

    E-Print Network [OSTI]

    Amin, S. Massoud

    !programs!of!replacement,!rehabilitation!and!new!investment!in!the! U.S.!infrastructure.! ! Focusing!on!the!electric!power!sector,!the!power!outages!whether!the!carrying!capacity!or!safety!margin!will!exist! to!support!anticipated!demand!is!in!question.! ! To!assess!impacts!using!actual!electric!power!outage! Draft!07"18"2011! 1 Turning the Tide on Outages1 What are the true costs of implementing

  8. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-27T23:59:59.000Z

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  9. activity management system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    automated management agents whose behavior also has to dynamically change to reflect the evolution of the system being managed. Policies are a means of specifying and influencing...

  10. Verification of Network Management System Configurations David L. Cohrs

    E-Print Network [OSTI]

    Miller, Barton P.

    , with the use of simple, ad hoc tools. However in a large network, managing the net- work management system the amount of sharing and coordination possible in configuring the net- work management system. EachVerification of Network Management System Configurations David L. Cohrs (608) 262-6617 dave

  11. System for Award Management (SAM):

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014,Zaleski -BlueprintThis documentEnergy(SHINES)Full DocumentSystem for

  12. The DIRAC Data Management System (poster)

    E-Print Network [OSTI]

    Haen, Christophe

    2015-01-01T23:59:59.000Z

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  13. Data Management System of the DIRAC Project

    E-Print Network [OSTI]

    Haen, Christophe; Tsaregorodtsev, Andrei

    2015-01-01T23:59:59.000Z

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  14. HEMS, a Hurricane Evacuation Management System

    E-Print Network [OSTI]

    Cardei, Mihaela

    HEMS, a Hurricane Evacuation Management System Arny Ambrose, Mihaela Cardei, and Ionut Cardei, there has been a high incidence of hurricanes over the past decade. Before a hurricane makes landfall and challenges associated with hurricane evacuation of health care centers, such as nursing homes. Then, we

  15. Patient-centric Hurricane Evacuation Management System

    E-Print Network [OSTI]

    Cardei, Mihaela

    Patient-centric Hurricane Evacuation Management System Arny Ambrose, Mihaela Cardei, and Ionut--In the United States, there has been a high incidence of hurricanes over the past decade. Before a hurricane investigate the characteristics and challenges associated with hurricane evacuation of health care centers

  16. Management and Safety of Transportation Systems

    E-Print Network [OSTI]

    Carver, Jeffrey C.

    Management and Safety of Transportation Systems University Transportation Center for Alabama A N N@eng.ua.edu www.eng.ua.edu Editors: James Cruise, Ph.D. Barbara Moore University Transportation Center for Alabama Transportation Center for Alabama (UTCA). The contents of this Annual Report reflect the views of the editors

  17. Management Information Systems Mexico City EMBA Program

    E-Print Network [OSTI]

    Ghosh, Joydeep

    Management Information Systems Mexico City EMBA Program Spring 2012 Professor : Professor Anitesh benefits. The true benefits of IT can be realized only when organizations exploit certain characteristics ISBN-13: 978-0123822291 Data Mining for Business Intelligence: Concepts, Techniques, and Applications

  18. Optimal Power Management in Wireless Control Systems

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    Optimal Power Management in Wireless Control Systems Konstantinos Gatsis, Student Member, IEEE to the controller over a wireless fading channel. The power allocated to these transmissions determines state. The goal is to design plant input and transmit power policies that minimize an infinite horizon

  19. Policy Management for Networked Systems and Applications

    E-Print Network [OSTI]

    Lee, Kang-Won

    Policy Management for Networked Systems and Applications Dakshi Agrawal, Seraphin Calo, James Giles {agrawal,scalo,gilesjam,kangwon,dverma}@us.ibm.com Abstract In this paper, we present a novel policy and administrative domains. The proposed policy middleware provides a standard infrastructure for the creation

  20. Implementing Management Systems-Based Assessments

    SciTech Connect (OSTI)

    Campisi, John A.; Reese, Robert T.

    1999-05-03T23:59:59.000Z

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in centralized management systems. The resulting corporate management system gives the appearance of an assembly of multiple, nearly independent operating units. The executive management system maintains these separate units, encouraging autonomy and creativity by establishing a minimum of requirements and procedures. In any organization, senior management has a responsibility to ensure that all operating units are meeting requirements. Part of this responsibility is fulfilled by conducting oversight or assurance activities, to determine the effectiveness of established systems in meeting requirements and performance expectations. Internal independent assessment is one of these assurance activities. Independent appraisals are combined with external audits and appraisals, self-assessments, peer reviews, project reviews, and other internal and external audits (e.g., financial, contractual) for a more complete assurance view. At SNL, internal independent appraisals are performed by the Audit Center, which reports directly to the Executive Vice President. ES&H independent appraisals are the responsibility of the ES&H and Quality Assessments Department, with a staff complement of eight. With our organization's charter to perform internal, independent appraisals, we set out to develop an approach and associated tools, which would be useful in the overall SNL environment and within our resource limitations.

  1. Storage Management for Object-Oriented Database Management Systems: A Comparative Survey

    E-Print Network [OSTI]

    Waterloo, University of

    Storage Management for Object-Oriented Database Management Systems: A Comparative Survey David Dueck, Yiwen Jiang, and Archana Sawhney Contents 1 Introduction * * 71 2 The O2 Object Manager 71 2.1 Object

  2. Sustainable System for Residual Hazards Management

    SciTech Connect (OSTI)

    Kevin M. Kostelnik; James H. Clarke; Jerry L. Harbour

    2004-06-01T23:59:59.000Z

    Hazardous, radioactive and other toxic substances have routinely been generated and subsequently disposed of in the shallow subsurface throughout the world. Many of today’s waste management techniques do not eliminate the problem, but rather only concentrate or contain the hazardous contaminants. Residual hazards result from the presence of hazardous and/or contaminated material that remains on-site following active operations or the completion of remedial actions. Residual hazards pose continued risk to humans and the environment and represent a significant and chronic problem that require continuous longterm management (i.e. >1000 years). To protect human health and safeguard the natural environment, a sustainable system is required for the proper management of residual hazards. A sustainable system for the management of residual hazards will require the integration of engineered, institutional and land-use controls to isolate residual contaminants and thus minimize the associated hazards. Engineered controls are physical modifications to the natural setting and ecosystem, including the site, facility, and/or the residual materials themselves, in order to reduce or eliminate the potential for exposure to contaminants of concern (COCs). Institutional controls are processes, instruments, and mechanisms designed to influence human behavior and activity. System failure can involve hazardous material escaping from the confinement because of system degradation (i.e., chronic or acute degradation) or by externalintrusion of the biosphere into the contaminated material because of the loss of institutional control. An ongoing analysis of contemporary and historic sites suggests that the significance of the loss of institutional controls is a critical pathway because decisions made during the operations/remedial action phase, as well as decisions made throughout the residual hazards management period, are key to the longterm success of the prescribed system. In fact, given that society has become more reliant on and confident of engineered controls, there may be a growing tendency to be even less concerned with institutional controls.

  3. Optimal management of batteries in electric systems

    DOE Patents [OSTI]

    Atcitty, Stanley (Albuquerque, NM); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM); Symons, Philip C. (Morgan Hill, CA)

    2002-01-01T23:59:59.000Z

    An electric system including at least a pair of battery strings and an AC source minimizes the use and maximizes the efficiency of the AC source by using the AC source only to charge all battery strings at the same time. Then one or more battery strings is used to power the load while management, such as application of a finish charge, is provided to one battery string. After another charge cycle, the roles of the battery strings are reversed so that each battery string receives regular management.

  4. Environmental remediation and waste management information systems

    SciTech Connect (OSTI)

    Harrington, M.W.; Harlan, C.P.

    1993-12-31T23:59:59.000Z

    The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

  5. System integration test plan for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Wilson, D.

    1998-08-24T23:59:59.000Z

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  6. Homeowners: Respond to Power Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking of Blythe Solar PowerCommercialEnergy Star HomePower Outages Homeowners:

  7. LRRB Pavement Management SystemsTraffic Generator Managing Interaction Between Local

    E-Print Network [OSTI]

    Minnesota, University of

    LRRB Pavement Management SystemsTraffic Generator Managing Interaction Between Local Authorities Research Board May 24, 2011 22nd Annual Transportation Research Conference #12;LRRB Pavement ManagementSCU, Consultants, etc. · Administered by Mn/DOT Research Services LRRB Funding #12;LRRB Pavement Management Systems

  8. Event-Driven Power Management of Portable Systems

    E-Print Network [OSTI]

    Simunic, Tajana

    in modeling real- life systems where transition times between power states are not geometrically distributed power management effi- ciently exploits system resources by controlling their mode of operation-level power management. The abstract model of the system re- sources adopted in system-level power management

  9. Seamless Energy Management Systems Part II: Development of Prototype

    E-Print Network [OSTI]

    Seamless Energy Management Systems Part II: Development of Prototype Core Elements Final Project System #12;#12;Seamless Energy Management Systems Part II: Development of Prototype Core Elements Final Center (PSERC) research project entitled "Seamless Energy Management Systems" (S-53G for 2013

  10. PoL Vout 1Adapter Power Management System

    E-Print Network [OSTI]

    Prodić, Aleksandar

    Battery charger Vbatt Vbus PoL Vout 1Adapter Vout 2 Vout n PoL PoL Vadap SW1 SW2 Power Management System Bus Converter Fig.1: Conventional laptop power management system Power Management Architecture, Mor M. Peretz, and Aleksandar Prodi Laboratory for Power Management and Integrated SMPS, ECE

  11. Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla

    E-Print Network [OSTI]

    Browne, James C.

    Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla University of Texas describes a taxonomy for classifying resource management architectures and presents the survey of resource of grid resource management systems; section 4 presents the survey of resource management in popular grid

  12. Used Fuel Management System Interface Analyses - 13578

    SciTech Connect (OSTI)

    Howard, Robert; Busch, Ingrid [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States)] [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States); Nutt, Mark; Morris, Edgar; Puig, Francesc [Argonne National Laboratory (United States)] [Argonne National Laboratory (United States); Carter, Joe; Delley, Alexcia; Rodwell, Phillip [Savannah River National Laboratory (United States)] [Savannah River National Laboratory (United States); Hardin, Ernest; Kalinina, Elena [Sandia National Laboratories (United States)] [Sandia National Laboratories (United States); Clark, Robert [U.S. Department of Energy (United States)] [U.S. Department of Energy (United States); Cotton, Thomas [Complex Systems Group (United States)] [Complex Systems Group (United States)

    2013-07-01T23:59:59.000Z

    Preliminary system-level analyses of the interfaces between at-reactor used fuel management, consolidated storage facilities, and disposal facilities, along with the development of supporting logistics simulation tools, have been initiated to provide the U.S. Department of Energy (DOE) and other stakeholders with information regarding the various alternatives for managing used nuclear fuel (UNF) generated by the current fleet of light water reactors operating in the United States. An important UNF management system interface consideration is the need for ultimate disposal of UNF assemblies contained in waste packages that are sized to be compatible with different geologic media. Thermal analyses indicate that waste package sizes for the geologic media under consideration by the Used Fuel Disposition Campaign may be significantly smaller than the canisters being used for on-site dry storage by the nuclear utilities. Therefore, at some point along the UNF disposition pathway, there could be a need to repackage fuel assemblies already loaded and being loaded into the dry storage canisters currently in use. The implications of where and when the packaging or repackaging of commercial UNF will occur are key questions being addressed in this evaluation. The analysis demonstrated that thermal considerations will have a major impact on the operation of the system and that acceptance priority, rates, and facility start dates have significant system implications. (authors)

  13. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-01-01T23:59:59.000Z

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

  14. Wiedenhfer et al. Inter-Organizational Crisis Management Infrastructure for Electrical Power Breakdowns

    E-Print Network [OSTI]

    Wiedenhöfer et al. Inter-Organizational Crisis Management Infrastructure for Electrical Power Breakdowns Inter-Organizational Crisis Management Infrastructures for Electrical Power Breakdowns Torben-Organizational Crisis Management Infrastructure for Electrical Power Breakdowns medium to large power outages among

  15. Electricity Demand and Energy Consumption Management System

    E-Print Network [OSTI]

    Sarmiento, Juan Ojeda

    2008-01-01T23:59:59.000Z

    This project describes the electricity demand and energy consumption management system and its application to the Smelter Plant of Southern Peru. It is composted of an hourly demand-forecasting module and of a simulation component for a plant electrical system. The first module was done using dynamic neural networks, with backpropagation training algorithm; it is used to predict the electric power demanded every hour, with an error percentage below of 1%. This information allows management the peak demand before this happen, distributing the raise of electric load to other hours or improving those equipments that increase the demand. The simulation module is based in advanced estimation techniques, such as: parametric estimation, neural network modeling, statistic regression and previously developed models, which simulates the electric behavior of the smelter plant. These modules allow the proper planning because it allows knowing the behavior of the hourly demand and the consumption patterns of the plant, in...

  16. Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System

    SciTech Connect (OSTI)

    Stoupis, James; Mousavi, Mirrasoul

    2014-09-30T23:59:59.000Z

    New data collection system equipment was installed in Xcel Energy substations and data was collected from 6 substations and 20 feeders. During Phase I, ABB collected and analyzed 793 real-time events to date from 6 Xcel Energy substations and continues today. The development and integration of several applications was completed during the course of this project, including a model-based faulted segment identification algorithm, with very positive results validated with field-gathered data discussed and included in this report. For mostly underground feeders, the success rate is 90% and the overreach rate is 90%. For mostly overhead feeders, the success rate is 74% and the overreach rate is 50%. The developed method is producing very accurate results for mostly underground feeders. For mostly overhead feeders, due to the bad OMS data quality and varying fault resistance when arcing, the developed method is producing good results but with much room for improvement. One area where the algorithm can be improved is the accuracy for sub-cycle fault events. In these cases, the accuracy of the conventional signal processing methods suffers due to most of these methods being based on a one-cycle processing window. By improving the signal processing accuracy, the accuracy of the faulted segment identification algorithm will also improve significantly. ABB intends to devote research in this area in the near future to help solve this problem. Other new applications developed during the course of the project include volt/VAR monitoring, unbalanced capacitor switching detection, unbalanced feeder loading detection, and feeder overloading detection. An important aspect of the demonstration phase of the project is to show the ability to provide adequate “heads-up” time ahead of customer calls or AMI reports so that the operators are provided with the much needed time to collect information needed to address an outage. The advance notification feature of the demonstration system provides this time and helps accelerate service restoration ultimately. To demonstrate the effectiveness of this feature, a demo system using substation data alone was set up to compare the minutes saved over a period of 22 months for two feeders where the real-time notification system has been deployed. The metric used for performance assessment is the time difference between the actual outage time from the OMS versus the time the notification email was received on the operators desk. Over the period of 22 months, we have accumulated over 7600 minutes (32 hours) ahead of actual outage time compared to the OMS timestamps. The significance of this analysis is that it shows the potential to reduce the SAIDI minutes and directly impact utility performance in terms of outage duration. If deployed at scale, it would have a significant impact on system reliability. To put this number in perspective, it would be helpful to assign a dollar figure to the potential savings that could be realized. According to the host utility, the average cost for each customer-minute-out (CMO) is approximately $0.30 across the operating company. This includes both direct and indirect costs such as bad press. The outage data over the previous 4 years show that the average customer count on primary/tap level outages is about 56. Accordingly, the total minutes saved amounts to 425,600 CMOs on the average. This would in turn result in a potential cost savings figure of $127,680 for two feeders alone over the period of performance. This empirical evidence validates the strong value proposition of the project that was contemplated at the onset and its potential impact to reduce outage duration in support of DOE’s goal of 20%

  17. IEEE TRANSACTIONS ON COMMUNICATIONS, VOL. 62, NO. 2, FEBRUARY 2014 699 Outage Probability in

    E-Print Network [OSTI]

    Zhou, Xiangyun "Sean"

    transform of a cumulative distribution and (ii) a reference link power gain-based framework which exploits the distribution of the fading power gain between the reference transmitter and receiver. The outage probability the outage probability at any location inside either a disk or polygon region. The analysis illustrates

  18. System and method for advanced power management

    DOE Patents [OSTI]

    Atcitty, Stanley (Albuquerque, NM); Symons, Philip C. (Surprise, AZ); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM)

    2009-07-28T23:59:59.000Z

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  19. Survey Report: Improving Integration of Program Management and Systems Engineering

    E-Print Network [OSTI]

    Conforto, Edivandro

    For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

  20. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  1. CERTIFICATE OF APPROVAL Thisisto certifythat the Quality Management System of

    E-Print Network [OSTI]

    Chapman, Clark R.

    CERTIFICATE OF APPROVAL Thisisto certifythat the Quality Management System of: Southwest Research been approved by Lloyd's Register Quality Assurance to the following Quality Management System Standards: ISO 9001 :2008 ANSIIISO/ ASQ Q9001-2008 The Quality Management System is applicable to: Research

  2. Dynamic Power Management for Portable Systems Tajana Simunic

    E-Print Network [OSTI]

    De Micheli, Giovanni

    Dynamic Power Management for Portable Systems Tajana Simunic Computer Systems Laboratory Stanford delivering high performance. Dynamic power management (DPM) policies trade off the performance for the power by commands issued by a power manager (PM) that observes the workload of the system and decides when and how

  3. V-132: IBM Tivoli System Automation Application Manager Multiple...

    Broader source: Energy.gov (indexed) [DOE]

    IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation...

  4. Business Manangement System(BMS), RL-2008/Project Hanford Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Manangement System(BMS), RL-2008Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008...

  5. asset management system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    techniques for early error detection and fast recovery in a database management system (DBMS California at Irvine, University of 405 Division of Information Information Systems...

  6. asthma management system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    techniques for early error detection and fast recovery in a database management system (DBMS California at Irvine, University of 302 Division of Information Information Systems...

  7. IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 2, MAY 2007 505 Detection of Island Formation and Identification

    E-Print Network [OSTI]

    Gross, George

    and Identification of Causal Factors Under Multiple Line Outages Teoman Güler, Student Member, IEEE, and George Gross formation in power system networks under multiple line outages. We construct the approach by gaining insights into the topological impacts of outaged lines on system connectivity from the use of power

  8. Environmental management system objectives & targets results summary :

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2014-04-01T23:59:59.000Z

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  9. Aurora: A Data Stream Management System , D. Carney

    E-Print Network [OSTI]

    Cherniack, Mitch

    Aurora: A Data Stream Management System D. Abadi , D. Carney§ , U. Cetintemel§ , M. Cherniack , C.I.T. Abstract The Aurora system [1] is an experimental data stream management system with a fully functional to demonstrate the Aurora system with its development environment and runtime system, with several example

  10. The Dark Energy Survey Data Management System

    E-Print Network [OSTI]

    Sevilla, I; Bertin, E; Carlson, A; Daues, G; Desai, S; Gower, M; Gruendl, R; Hanlon, W; Jarvis, M; Kessler, R; Kuropatkin, N; Lin, H; Marriner, J; Mohr, J; Petravick, D; Sheldon, E; Swanson, M E C; Tomashek, T; Tucker, D; Yang, Y; Yanny, B

    2011-01-01T23:59:59.000Z

    The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

  11. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Sevilla, I.; /Madrid, CIEMAT; Armstrong, R.; Jarvis, M.; /Pennsylvania U.; Bertin, E.; /Paris, Inst. Astrophys.; Carlson, A.; Desai, S.; Mohr, J.; /Munich U.; Daues, G.; Gower, M.; Gruendl, R.; Petravick, D.; /Illinois U., Urbana /Illinois U., Urbana /Chicago U. /Fermilab /Brookhaven /Harvard-Smithsonian Ctr. Astrophys.

    2011-09-01T23:59:59.000Z

    The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

  12. Major: Ecological Systems Design, Air Quality Control and Waste Management

    E-Print Network [OSTI]

    Giger, Christine

    1 Major: Ecological Systems Design, Air Quality Control and Waste Management · Being able to solve control technologies · Knowledge in waste management and technologies Module 1: Ecological Systems Design quality control and biogas Waste management and air quality control Examples for combination of Modules

  13. Resources Annotation, Retrieval and Presentation: a Semantic Annotation Management System

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    for the management of metadata records, each attribute of the record being represented by one or more triples to the resource management system itself. Expressing metadata records in RDF allows us to see metadata as semanticResources Annotation, Retrieval and Presentation: a Semantic Annotation Management System M. Albert

  14. Human Interactive Mission Manager : an autonomous mission manager for human cooperative systems

    E-Print Network [OSTI]

    Furtado, Jason M. (Jason Manuel)

    2008-01-01T23:59:59.000Z

    Facilitating low level human supervisory control of mission management is highly challenging because of concerns regarding system stability and performance. Previous implementations of mission managers based on C. S. Draper ...

  15. Fish Health Management Considerations in Recirculating Aquaculture Systems -Part 1

    E-Print Network [OSTI]

    Watson, Craig A.

    Cir 120 Fish Health Management Considerations in Recirculating Aquaculture Systems - Part 1 operations, and retail pet stores. When properly managed, these systems have the advantages of both reducing of nutrition and water quality, as compared to pond systems. However, recirculating systems have their own

  16. Departmental Integrated Safety Management System (9-23-10)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-09-23T23:59:59.000Z

    This directive will convert and consolidate DOE M 450.4-1, Integrated Safety Management System Manual and DOE M 411.1-1C, Safety Management Functions, Responsibilities, and Authorities Manual into a single Order.

  17. Design of a Computerized Energy Management System for Marine Applications 

    E-Print Network [OSTI]

    Russell, B. D.; Perry, L. W.; Gerloff, G. W.; Heller, R. P.; Pankonien, G.

    1982-01-01T23:59:59.000Z

    A computer-based energy management system for marine applications is presented. The problem of fuel-management for large diesel engines on board ship is discussed. The design of the computer hardware and software are presented including...

  18. Leadership in Health Care Systems: Health Care Organization Management

    E-Print Network [OSTI]

    Goldman, Steven A.

    Leadership in Health Care Systems: Health Care Organization Management and Leadership Track: ­ Health Care Organization, Management and Leadership ­ Clinical Research Coordinator ­ Clinical Nurse in health care ethics ­ Public mission ­ Fiscal stewardship ­ Inclusiveness and diversity ­ Theory based

  19. V-174: RSA Authentication Manager Writes Operating System, SNMP...

    Broader source: Energy.gov (indexed) [DOE]

    RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files PLATFORM: RSA Authentication Manager 8.0 ABSTRACT: A...

  20. Harrison Radiator Division's Energy Management, Reporting and Accounting System 

    E-Print Network [OSTI]

    Goubeaux, R. J.

    1986-01-01T23:59:59.000Z

    Energy management is essential for obtaining the lowest possible product manufacturing cost. Many systems have been created over the years to manage the energy used in manufacturing. However, for a variety of reasons, most of them never reached...

  1. Utility system integration and optimization models for nuclear power management

    E-Print Network [OSTI]

    Deaton, Paul Ferris

    1973-01-01T23:59:59.000Z

    A nuclear power management model suitable for nuclear utility systems optimization has been developed for use in multi-reactor fuel management planning over periods of up to ten years. The overall utility planning model ...

  2. Design of a Computerized Energy Management System for Marine Applications

    E-Print Network [OSTI]

    Russell, B. D.; Perry, L. W.; Gerloff, G. W.; Heller, R. P.; Pankonien, G.

    1982-01-01T23:59:59.000Z

    A computer-based energy management system for marine applications is presented. The problem of fuel-management for large diesel engines on board ship is discussed. The design of the computer hardware and software are presented including...

  3. An interactive spatial information management system on the internet: the fire ant spatial information management system

    E-Print Network [OSTI]

    Dudek, Timothy Kirk

    2000-01-01T23:59:59.000Z

    to that information. The primary purpose of any information management system is to provide users with information that is complete, accurate, and in real-time (Obermeyer and Pinto 1994). The Internet has the capability to do just that with spatial data...

  4. Spectrum Sharing in Cognitive Radio Systems Under Outage Probablility Constraint

    E-Print Network [OSTI]

    Cai, Pei Li

    2011-02-22T23:59:59.000Z

    (SU) link with multiple transmitting an- tennas and a single receiving antenna, coexisting with a primary user (PU) link with a single receiving antenna. At the SU transmitter (SU-Tx), the channel state infor- mation (CSI) of the SU link is assumed... to be perfectly known; while the interference channel from the SU-Tx to the PU receiver (PU-Rx) is not perfectly known due to less cooperation between the SU and the PU. As such, the SU-Tx is only assumed to know that the interference channel gain can take values...

  5. Outage Performance of Double Stratospheric Platforms Diversity Systems

    E-Print Network [OSTI]

    Gesbert, David

    /stratospheric platforms (HAPs) are either airships or planes that operate in the stratosphere, 17-22km above the ground [1

  6. Estimating Hurricane Outage and Damage Risk in Power Distribution System

    E-Print Network [OSTI]

    Han, Seung Ryong

    2009-05-15T23:59:59.000Z

    significantly impacted recently by Hurricanes Danny (1997), Georges (1998), Hanna (2002), Isidore (2002), Frances (2004), Ivan (2004), Jeanne (2004), Cindy (2005), Dennis (2005), and Katrina (2005). In addition to causing considerable direct repair... (Dennis, Ivan, and Katrina), and during 8 hurricanes in State C (Cindy, Dennis, Frances, Hanna, Isidore, Ivan, Jeanne, and Katrina). 3.1 Hurricane Characteristic Data In order to capture the characteristics of the wind field during a given hurricane...

  7. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.5

    SciTech Connect (OSTI)

    Bower, John C. (BATTELLE (PACIFIC NW LAB)); Burnett, Robert A. (BATTELLE (PACIFIC NW LAB)); Carter, Richard J. (BATTELLE (PACIFIC NW LAB)); Downing, Timothy R. (BATTELLE (PACIFIC NW LAB)); Homer, Brian J. (BATTELLE (PACIFIC NW LAB)); Holter, Nancy A. (BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M. (BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L. (BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M. (BATTELLE (PACIFIC NW LAB)); Loveall, Robert M. (BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Schulze, Stacy A. (BATTELLE (PACIFIC NW LAB)); Sivaraman, Chitra (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J. (BATTELLE (PACIFIC NW LAB)); Stoops, Lamar R. (BATTELLE (PACIFIC NW LAB)); Wood, Blanche M. (BATTELLE (PACIFIC NW LAB))

    2001-12-01T23:59:59.000Z

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS System Administration Guide provides information on FEMIS System Administrator activities as well as the utilities that are included with FEMIS.

  8. Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network

    E-Print Network [OSTI]

    Nagurney, Anna

    Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network Operations Management and Design of A Sustainable Blood Banking System Amir Masoumi of Massachusetts Amherst #12;Introduction Operations Management of Blood Banking Systems Blood Banking Systems

  9. 1674 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 25, NO. 3, AUGUST 2010 Security-Constrained Generation and Transmission

    E-Print Network [OSTI]

    Fu, Yong

    -Constrained Generation and Transmission Outage Scheduling With Uncertainties Lei Wu, Member, IEEE, Mohammad Shahidehpour systems including forced outages of generation units and transmission lines, load forecast errors-and-cut method using CPLEX. The outcome of this study includes the hourly scheduling of outages of gener- ation

  10. The Do and Check Processes of an Energy Management System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMayDepartmentTest for Pumping SystemDepartmentDepartmentOutages Nationwide

  11. The Dark Energy Survey Data Management System

    E-Print Network [OSTI]

    Joseph J. Mohr; Wayne Barkhouse; Cristina Beldica; Emmanuel Bertin; Y. Dora Cai; Luiz da Costa; J. Anthony Darnell; Gregory E. Daues; Michael Jarvis; Michelle Gower; Huan Lin; leandro Martelli; Eric Neilsen; Chow-Choong Ngeow; Ricardo Ogando; Alex Parga; Erin Sheldon; Douglas Tucker; Nikolay Kuropatkin; Chris Stoughton

    2008-07-16T23:59:59.000Z

    The Dark Energy Survey collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at NCSA and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used Teragrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  12. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Mohr, Joseph J.; /Illinois U., Urbana, Astron. Dept. /Illinois U., Urbana; Barkhouse, Wayne; /North Dakota U.; Beldica, Cristina; /Illinois U., Urbana; Bertin, Emmanuel; /Paris, Inst. Astrophys.; Dora Cai, Y.; /NCSA, Urbana; Nicolaci da Costa, Luiz A.; /Rio de Janeiro Observ.; Darnell, J.Anthony; /Illinois U., Urbana, Astron. Dept.; Daues, Gregory E.; /NCSA, Urbana; Jarvis, Michael; /Pennsylvania U.; Gower, Michelle; /NCSA, Urbana; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

    2008-07-01T23:59:59.000Z

    The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  13. Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities Coordination\\3734 Red 6 1 01 Lecturn Instructions.doc

    E-Print Network [OSTI]

    Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities

  14. LED lamp power management system and method

    DOE Patents [OSTI]

    Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

    2013-03-19T23:59:59.000Z

    An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

  15. An Open-Source Learning Content Management and Assessment System

    E-Print Network [OSTI]

    LON-CAPA An Open-Source Learning Content Management and Assessment System Gerd Kortemeyer-CAPA is free open-source a learning content management system an assessment system around since 1992 #12 Cross-Institutional Resource Library (Base de Dados Compartilhada entre Instituições) Resource Assembly

  16. A Control Approach to Bandwidth Management in Networked Control Systems

    E-Print Network [OSTI]

    Brandt, Scott A.

    A Control Approach to Bandwidth Management in Networked Control Systems Manel Velasco, Josep M management in networked control systems that allows control loops to consume band- width according bandwidth. I. INTRODUCTION Modern embedded systems are expected to provide more functionality and better

  17. An Architectural Approach for Integrated Network and Systems Management

    E-Print Network [OSTI]

    Boutaba, Raouf

    An Architectural Approach for Integrated Network and Systems Management Raouf Boutaba 1 and Simon. The constant growth in quantity and quality of networked systems and the thereby arising problems concerning introduce an architecture for the integrated management of all resources in a networked system, i

  18. Energy management system for a rotary machine and method therefor

    DOE Patents [OSTI]

    Bowman, Michael John; Sinha, Gautam (NMN); Sheldon, Karl Edward

    2004-11-09T23:59:59.000Z

    In energy management system is provided for a power generating device having a working fluid intake in which the energy management system comprises an electrical dissipation device coupled to the power generating device and a dissipation device cooling system configured to direct a portion of a working fluid to the electrical dissipation device so as to provide thermal control to the electrical dissipation device.

  19. Facilities management system (FMS). Final report

    SciTech Connect (OSTI)

    NONE

    1992-04-01T23:59:59.000Z

    The remainder of this report provides a detailed, final status of Andersen Consulting`s participation in the FMS systems implementation project and offers suggestions for continued FMS improvements. The report presents the following topics of discussion: (1) Summary and Status of Work (2) Recommendations for Continued Success (3) Contract Deliverables and Client Satisfaction The Summary and Status of Work section presents a detailed, final status of the FMS project at the termination of Andersen`s full-time participation. This section discusses the status of each FMS sub-system and of the Andersen major project deliverables. The Recommendations section offers suggestions for continued FMS success. The topics discussed include recommendations for each of the following areas: (1) End User and Business Operations (2) AISD; Development and Computer Operations (3) Software (4) Technical Platform (5) Control Procedures The Contract Deliverables and Client Satisfaction section discusses feedback received from Johnson Controls management and FMS system users. The report also addresses Andersen`s observations from the feedback.

  20. Quality Management System Guidelines - Building America Top Innovation...

    Energy Savers [EERE]

    (PHI) created custom quality management system guidelines for the design and construction of high performance homes, earning a 2013 Top Innovation award for their efforts....

  1. Balancing Generality and Specificity in Document Management Systems

    E-Print Network [OSTI]

    Edwards, Keith

    Balancing Generality and Specificity in Document Management Systems W. Keith Edwards and Anthony La-purpose applications that operate on that document. KEYWORDS: document management, user interfaces, extensible. Our desktop tools are specialized to match our document management tasks and have increased

  2. Event-Driven Power Management of Portable Systems

    E-Print Network [OSTI]

    De Micheli, Giovanni

    Event-Driven Power Management of Portable Systems Tajana Simunicy Luca Benini Giovanni De Micheliy Bologna, ITALY 40136 Abstract The policy optimization problem for dynamic power management has received. 1 Introduction Dynamic power management is a widely-employed low- power design technique. Dynamic

  3. VirtualPower: Coordinated Power Management in Virtualized Enterprise Systems

    E-Print Network [OSTI]

    Yang, Junfeng

    VirtualPower: Coordinated Power Management in Virtualized Enterprise Systems Ripal Nathuji CERCS Institute of Technology Atlanta, GA 30032 schwan@cc.gatech.edu ABSTRACT Power management has become. This paper explores how to inte- grate power management mechanisms and policies with the virtualization

  4. IMPACT OF INDIVIDUAL COGNITION ON PRODUCT LIFECYCLE MANAGEMENT SYSTEMS

    E-Print Network [OSTI]

    Boyer, Edmond

    IMPACT OF INDIVIDUAL COGNITION ON PRODUCT LIFECYCLE MANAGEMENT SYSTEMS Pierre-Emmanuel Arduin of Compičgne, France 1. Introduction Product Lifecycle Management (PLM) aims at an integrated management of all product-related information and processes through the entire lifecycle for Terzi et al. (2010). Within

  5. Utility Systems Management and Operational Optimization

    E-Print Network [OSTI]

    Dhole, V.; Seillier, D.; Garza, K.

    simultaneously within the context of an integrated utilities management objective. Aspen Utilities™ provides a single environment to optimize business processes relating to utilities management and substantially improves financial performance typically equivalent...

  6. Cryptographic Trust Management System Design Document

    SciTech Connect (OSTI)

    Edgar, Thomas W.; Clements, Samuel L.; Hadley, Mark D.; Maiden, Wendy M.; Manz, David O.; Zabriskie, Sean J.

    2010-08-04T23:59:59.000Z

    Deliverable for DOE NSTB Cryptographic Trust Management project. Design document to follow the Requirements document submitted in Sept 2009.

  7. Battery Thermal Management System Design Modeling

    SciTech Connect (OSTI)

    Pesaran, A.; Kim, G. H.

    2006-11-01T23:59:59.000Z

    Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

  8. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    SciTech Connect (OSTI)

    Mankamo, T. [Avaplan Oy, Espoo (Finland); Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States)

    1992-12-31T23:59:59.000Z

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested.

  9. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    SciTech Connect (OSTI)

    Mankamo, T. (Avaplan Oy, Espoo (Finland)); Kim, I.S.; Samanta, P.K. (Brookhaven National Lab., Upton, NY (United States))

    1992-01-01T23:59:59.000Z

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested.

  10. Increase Productivity - Implement Energy Management Systems with Project Management Techniques

    E-Print Network [OSTI]

    Spinner, M. P.

    1984-01-01T23:59:59.000Z

    Engineering Manager of this small but active division, I devote a big part of my time on justifying energy expenditures and the means to reduce these costs. Ten years ago energy costs were one tenth of today's costs and just about three percent of the division...

  11. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01T23:59:59.000Z

    Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  12. Management of Control System Information SecurityI: Control System Patch Management

    SciTech Connect (OSTI)

    Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

    2011-09-01T23:59:59.000Z

    The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

  13. A management information system model for convenience stores

    E-Print Network [OSTI]

    Moede, Eric Arne

    1978-01-01T23:59:59.000Z

    of infomna- tion that convenience store managers can use to accomplisll coimoany objecti v s . This model will serv as a guide with which convenience store companies can set up thei r own management information systems . ~si. Obj eii es 1) Identify...', and 6) the organizational impact of a manage- ment information system. E~i i 1 R h i ll g I I 0 ~tip. 5 -. +s The majority of research on management information systems has been theoretically oriented. Little empirical research has been achieved...

  14. Recommended Practice for Patch Management of Control Systems

    SciTech Connect (OSTI)

    Steven Tom; Dale Christiansen; Dan Berrett

    2008-12-01T23:59:59.000Z

    A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

  15. Design and implementation of a departmental information management system

    E-Print Network [OSTI]

    Xie, Dawen

    2009-05-15T23:59:59.000Z

    Management System (DBMS); 4. logical design; 5. physical design and 6. implementation. The following section brie y walks through each step [5]. The goals of the requirements analysis (Step 1) are to determine the data re- quirements of the database in terms... program, a degree program involves di erent documents. A Database Management System (DBMS) is computer software designed for the purpose of managing databases. Typical examples of DBMSs include Oracle, Microsoft SQL Server, and MySQL. Step 3 involves...

  16. Harrison Radiator Division's Energy Management, Reporting and Accounting System

    E-Print Network [OSTI]

    Goubeaux, R. J.

    HARRISON RADIATOR DIVISION'S ENERGY MANAGEMENT, REPORTING and ACCOUNTING SYSTEM Ronald J. Goubeaux Harrison Radiator Division Lockport, New York ABSTRACT Energy management is essential for obtaining the lowest possible product..., farm equipment, small aircraft and other types of vehicles. The energy management, reporting and accounting system that is covered in this paper is operating in Harrison's West Complex of the New York Operations located in Lockport, Western...

  17. Systems Engineering Integrating Project Management, Science, Engineering, and

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Systems Engineering Integrating Project Management, Science, Engineering, and Mission Operations Systems Engineering Experience LASP is a full-cycle space institute, combining all aspects of space exploration through our expertise in science, engineering, mission operations, data analysis, and education

  18. Systems Engineering Integrating Project Management, Science, Engineering, and

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Systems Engineering Integrating Project Management, Science, Engineering, and Mission Operations Systems Engineering Experience LASP is a full-cycle space research institute, combining all aspects of space exploration through our expertise in science, engineering, mission operations, data analysis

  19. Process for Managing and Customizing HPC Operating Systems

    SciTech Connect (OSTI)

    Brown, David ML

    2014-04-02T23:59:59.000Z

    A process for maintaining a custom HPC operating system was developed at the Environmental Molecular Sciences Laboratory (EMSL) over the past ten years. This process is generic and flexible to manage continuous change as well as keep systems updated while managing communication through well defined pieces of software.

  20. Inventory management with dynamic Bayesian network software systems

    E-Print Network [OSTI]

    Barker, Jon

    Inventory management with dynamic Bayesian network software systems Mark Taylor1 and Charles Fox2 1.fox@sheffield.ac.uk Abstract. Inventory management at a single or multiple levels of a supply chain is usually performed-the-shelf graphical software systems. We show how such sys- tems may be deployed to model a simple inventory problem

  1. SNL/CA Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2005-09-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  2. Control-Based Quality Adaptation in Data Stream Management Systems

    E-Print Network [OSTI]

    Hefeeda, Mohammed

    in a traditional DBMS, the processing of continuous queries in a data stream management system (DSMS) needs elements. Processing of data streams brings great challenges to DBMS design for two major reasons. First Management Systems 747 very common in data stream applications. Unlike those in a traditional DBMS, queries

  3. POEMS: A Transformable Architecture for Managing System Overload

    E-Print Network [OSTI]

    Ooi, Beng Chin

    , a central database management system (DBMS) receives requests internally or externally through an Internet result in the overload of the DBMS. Existing load management systems assume nodes are fully dedicated-server and Peer-to-Peer (P2P) architecture; it operates as a conventional DBMS under normal load condition without

  4. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  5. Business Process Management Systems enabling continuous improvement in industrial services

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Business Process Management Systems ­ enabling continuous improvement in industrial services Heikki that modern business process management systems (BPMS) provide in improving industrial service processes. A case study identifies improvement opportunities in the order-to- cash process in two service lines

  6. ORISE: Asset Readiness Management System (ARMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    equipment has been maintained. ARMS will notify a program manager via e-mail prior to any qualification lapsing. Similarly, equipment maintainers receive e-mail notifications of...

  7. OTRA-THS MAC to reduce Power Outage Data Collection Latency in a smart meter network

    SciTech Connect (OSTI)

    Garlapati, Shravan K [ORNL] [ORNL; Kuruganti, Phani Teja [ORNL] [ORNL; Buehrer, Richard M [ORNL] [ORNL; Reed, Jeffrey H [ORNL] [ORNL

    2014-01-01T23:59:59.000Z

    The deployment of advanced metering infrastructure by the electric utilities poses unique communication challenges, particularly as the number of meters per aggregator increases. During a power outage, a smart meter tries to report it instantaneously to the electric utility. In a densely populated residential/industrial locality, it is possible that a large number of smart meters simultaneously try to get access to the communication network to report the power outage. If the number of smart meters is very high of the order of tens of thousands (metropolitan areas), the power outage data flooding can lead to Random Access CHannel (RACH) congestion. Several utilities are considering the use of cellular network for smart meter communications. In 3G/4G cellular networks, RACH congestion not only leads to collisions, retransmissions and increased RACH delays, but also has the potential to disrupt the dedicated traffic flow by increasing the interference levels (3G CDMA). In order to overcome this problem, in this paper we propose a Time Hierarchical Scheme (THS) that reduces the intensity of power outage data flooding and power outage reporting delay by 6/7th, and 17/18th when compared to their respective values without THS. Also, we propose an Optimum Transmission Rate Adaptive (OTRA) MAC to optimize the latency in power outage data collection. The analysis and simulation results presented in this paper show that both the OTRA and THS features of the proposed MAC results in a Power Outage Data Collection Latency (PODCL) that is 1/10th of the 4G LTE PODCL.

  8. Management processes in U.S. air traffic management modernization : a study of global navigation satellite system development

    E-Print Network [OSTI]

    Sandvig, John H.

    1994-01-01T23:59:59.000Z

    This thesis investigates organization and management issues associated with the Federal Aviation Administration's (FAA) efforts to modernize the nation's Air Traffic Management (ATM) system. Focus is placed specifically ...

  9. Facilities Management Field Services

    E-Print Network [OSTI]

    Hickman, Mark

    Facilities Management Field Services FieldStationsAnnualReport2006 #12;Cover Photo by Dr Mark Jermy coast #12; Introduction A very wet Steve Weaver emerges from the river. Ah, field work! The Government broadband, at least there is now an alternative to the telephone line. Electrical power spikes (and outages

  10. Design, implementation, and benchmarking of a file manager for a relational database management system on a raw UNIX disk

    E-Print Network [OSTI]

    Narayanan, Pudugramam Shanker

    1994-01-01T23:59:59.000Z

    The file management component of a database management system (DBMS) has to be tailor designed to meet the performance demands of large database applications. The operating system (OS) file systems are typically not suitable for storing...

  11. Towards risk-based management of critical infrastructures : enabling insights and analysis methodologies from a focused study of the bulk power grid.

    SciTech Connect (OSTI)

    Richardson, Bryan T.; LaViolette, Randall A.; Cook, Benjamin Koger

    2008-02-01T23:59:59.000Z

    This report summarizes research on a holistic analysis framework to assess and manage risks in complex infrastructures, with a specific focus on the bulk electric power grid (grid). A comprehensive model of the grid is described that can approximate the coupled dynamics of its physical, control, and market components. New realism is achieved in a power simulator extended to include relevant control features such as relays. The simulator was applied to understand failure mechanisms in the grid. Results suggest that the implementation of simple controls might significantly alter the distribution of cascade failures in power systems. The absence of cascade failures in our results raises questions about the underlying failure mechanisms responsible for widespread outages, and specifically whether these outages are due to a system effect or large-scale component degradation. Finally, a new agent-based market model for bilateral trades in the short-term bulk power market is presented and compared against industry observations.

  12. Temperature and cooling management in computing systems

    E-Print Network [OSTI]

    Ayoub, Raid

    2011-01-01T23:59:59.000Z

    Heat-and-run: leveraging smt and cmp to manage power densityIn this chapter we target an SMT multicore processor. Figuremultiple threads e.g. SMT core that we show in Figure 3.1.

  13. An evaluation of the management system verification pilot at Hanford

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    1998-11-12T23:59:59.000Z

    The Chemical Management System (CMS), currently under development at Hanford, was used as the ''test program'' for pilot testing the value added aspects of the Chemical Manufacturers Association's (CMA) Management Systems Verification (MSV) process. The MSV process, which was developed by CMA's member chemical companies specifically as a tool to assist in the continuous improvement of environment, safety and health (ESH) performance, represents a commercial sector ''best practice'' for evaluating ESH management systems. The primary purpose of Hanford's MSV Pilot was to evaluate the applicability and utility of the MSV process in the Department of Energy (DOE) environment. However, because the Integrated Safety Management System (ISMS) is the framework for ESH management at Hanford and at all DOE sites, the pilot specifically considered the MSV process in the context of a possible future adjunct to Integrated Safety Management System Verification (ISMSV) efforts at Hanford and elsewhere within the DOE complex. The pilot involved the conduct of two-hour interviews with four separate panels of individuals with functional responsibilities related to the CMS including the Department of Energy Richland Operations (DOE-RL), Fluor Daniel Hanford (FDH) and FDH's major subcontractors (MSCS). A semi-structured interview process was employed by the team of three ''verifiers'' who directed open-ended questions to the panels regarding the development, integration and effectiveness of management systems necessary to ensure the sustainability of the CMS effort. An ''MSV Pilot Effectiveness Survey'' also was completed by each panel participant immediately following the interview.

  14. Management Plan Large-Area Time-of-Flight System

    E-Print Network [OSTI]

    Llope, William J.

    Management Plan for the Large-Area Time-of-Flight System for STAR at Brookhaven National Laboratory For the U.S. Department of Energy Office of Science Office of Nuclear Physics December 1, 2005 #12;2 STAR Project Manager Timothy Hallman STAR Spokesman Brookhaven National Lab approval: Thomas Ludlam BNL Project

  15. Towards an Intelligent system for managing Historical Archive Documents

    E-Print Network [OSTI]

    Kouroupetroglou, Georgios

    Towards an Intelligent system for managing Historical Archive Documents Akrivi Katifori-ontology expert users exploring ontologies. · The study of the possibilities of supporting user document and task management by using a personal ontology. · The implementation and evaluation of an algorithm using

  16. A Smart Energy System: Distributed Resource Management, Control and Optimization

    E-Print Network [OSTI]

    Beigl, Michael

    A Smart Energy System: Distributed Resource Management, Control and Optimization Yong Ding, Student of distributed energy resource and consumption management, which proposes to design a networked and embedded platform for realizing a dynamic energy mix and optimizing the energy consumption dy- namically. Based

  17. Energy Management in Mobile Devices with the Cinder Operating System

    E-Print Network [OSTI]

    Levis, Philip

    Energy Management in Mobile Devices with the Cinder Operating System Arjun Roy, Stephen M. Rumble and applications to con- trol and manage limited device resources such as energy. Cinder introduces two new hoarding unused energy. Cinder additionally institutes a global half-life to prevent malicious applications

  18. A Survey on Trust Management for Intelligent Transportation System

    E-Print Network [OSTI]

    Wolfson, Ouri E.

    A Survey on Trust Management for Intelligent Transportation System Shuo Ma, Ouri Wolfson Department@uic.edu ABSTRACT Trust management is a fundamental and critical aspect of any serious application in ITS. However, only a few studies have addressed this important problem. In this paper, we present a survey on trust

  19. Environmental Management System 2 2006 Site environmental report2-

    E-Print Network [OSTI]

    was designed to meet the rigorous requirements of the globally recognized International Organization: environmental management SyStem DRAFT gain registration to the ISO 400 and OHSAS 800 standards, an organization for Standardization (ISO) 14001 Environmental Management Standard, with additional emphasis on compliance, pollution

  20. Coding Hazardous Tree Failures for a Data Management System

    E-Print Network [OSTI]

    Standiford, Richard B.

    management; computer programs; coding. The Author Lee A. Paine is a forest pathologist, stationed in Berkeley in the manual on the indicated pages. Page 7, just above H. Property or Person Directly Affected, insert: CityCoding Hazardous Tree Failures for a Data Management System Lee A. Paine PACIFIC SOUTHWEST

  1. A Model Checking Approach to Evaluating System Level Dynamic Power Management Policies for Embedded Systems

    E-Print Network [OSTI]

    Gupta, Rajesh

    A Model Checking Approach to Evaluating System Level Dynamic Power Management Policies for Embedded, and laptops, controlling power dissipation is an important system design issue [2]. This is either because enforced at the system level. In [3], a system modeling ap- proach for dynamic power management strategy

  2. Policy on Building use during Ventilation Outage: School of Science Roger Bacon Hall and Morrell Science Center

    E-Print Network [OSTI]

    Policy on Building use during Ventilation Outage: School of Science Roger Bacon Hall and Morrell) are present. For this reason, the School of Science has a special policy for times when building ventilation is not functioning as designed. A common cause of inadequate building ventilation is a power outage. Laboratory

  3. New Demands on Heavy Duty Engine Management Systems

    Broader source: Energy.gov (indexed) [DOE]

    on Heavy Duty Engine Management Systems Excellence in Automotive R&D Emissions Based Process Control NOx-Reducing by EGR NOx -Reducing by SOI Freez e Activation Signal...

  4. 15.568A Management Information Systems, Spring 2003

    E-Print Network [OSTI]

    Gibson, Cyrus F.

    The course purpose is to provide the substance and skill necessary to make sound business decisions relating to information systems, and to work with senior line managers in the resolution of issues and problems in this ...

  5. Buildings and corporate strategy : towards a management system model

    E-Print Network [OSTI]

    Brana, Rodrigo

    1985-01-01T23:59:59.000Z

    This thesis focuses on buildings as a subject of attention and inquiry in a corporate setting. It attempts to draw implications for the design of a management system to deal with the special nature of buildings as a resource. ...

  6. The Bureau of Land Management's Well Information System (WIS...

    Open Energy Info (EERE)

    Bureau of Land Management's Well Information System (WIS) How-To Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  7. Demand Control Utilizing Energy Management Systems - Report of Field Tests

    E-Print Network [OSTI]

    Russell, B. D.; Heller, R. P.; Perry, L. W.

    1984-01-01T23:59:59.000Z

    Energy Management systems and particularly demand controllers are becoming more popular as commercial and light industrial operations attempt to reduce their electrical usage and demand. Numerous techniques are used to control energy use and demand...

  8. Optimal Shipboard Power System Management via Mixed Integer Dynamic Programming

    E-Print Network [OSTI]

    Kwatny, Harry G.

    feedback controls is described. Examples are given. I. INTRODUCTION Maintaining power flow to vital loads following component failure(s) is a central goal of power system management including electric shipboard

  9. Agile Development and Dependency Management for Industrial Control Systems

    E-Print Network [OSTI]

    Copy, B

    2011-01-01T23:59:59.000Z

    The production and exploitation of industrial control systems differ substantially from traditional information systems; this is in part due to constraints on the availability and change lifecycle of production systems, as well as their reliance on proprietary protocols and software packages with little support for open development standards [1]. The application of agile software development methods therefore represents a challenge which requires the adoption of existing change and build management tools and approaches that can help bridging the gap and reap the benefits of managed development when dealing with industrial control systems. This paper will consider how agile development tools such as Apache Maven for build management, Hudson for continuous integration or Sonatype Nexus for the operation of "definite media libraries" were leveraged to manage the development lifecyle of the CERN UAB framework [2], as well as other crucial building blocks of the CERN accelerator infrastructure, such as the CERN Co...

  10. Updated Proposal for a Guide for Quality Management Systems for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a Guide for Quality Management Systems for PV Manufacturing: Supplemental Requirements to ISO 9001-2008 Govind Ramu, 1 Masaaki Yamamichi, 2 Wei Zhou, 3 Alex Mikonowicz, 4 Sumanth...

  11. ISO 50001: A Global Energy Management System Standard

    E-Print Network [OSTI]

    Chowdhury, N.

    2013-01-01T23:59:59.000Z

    ISO 50001:2011 provides benefits for any organization to establish a framework to manage and improve energy consumption. The framework of ISO 50001:2011 enables organizations to establish the systems and processes necessary to improve energy...

  12. An Open-Source Learning Content Management and Assessment System

    E-Print Network [OSTI]

    LON-CAPA An Open-Source Learning Content Management and Assessment System Gerd Kortemeyer Michigan system an assessment system around since 1992 #12;Free and Open-Source · Free: "Free beer=split(/\\,/,$line); $username=$entries[4]; _ #12;Campus A Campus B LON-CAPA Architecture Shared Cross-Institutional Resource

  13. Node Control System A Cluster Management Tool for

    E-Print Network [OSTI]

    Fedosov, Alexey

    Node Control System A Cluster Management Tool for Teaching and Research Alex Fedosov Keck Cluster returned to the user e.g. PBS (OpenPBS) Our main goal is interactive development Batch system have very .machines file #12;Features (cont.) Node Domains Users may want to have a specific operating system or node

  14. Selection and Evaluation of Energy Management and Control Systems

    E-Print Network [OSTI]

    Moderow, R. R.

    1982-01-01T23:59:59.000Z

    1. Why have many Energy Management and Control (EMC) systems failed to be truly cost effective? 2. What are the inherent problems in the selection of an EMC system? 3. What should an EMC system have to offer before being seriously considered...

  15. ECOSystem: Managing Energy as a First Class Operating System Resource

    E-Print Network [OSTI]

    Vahdat, Amin

    ECOSystem: Managing Energy as a First Class Operating System Resource Ł Heng Zeng, Carla S. Ellis design. This paper explores how to support energy as a first-class operating system resource. En- ergy the limited energy resource among competing tasks. 1. INTRODUCTION Traditionally, the operating system plays

  16. Power Optimization and Management in Embedded Systems1 Massoud Pedram

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Power Optimization and Management in Embedded Systems1 Massoud Pedram University of Southern on the system performance and quality of service (QoS). Power-aware high-level language compilers, dynamic power for understanding power- aware design methodologies and techniques targeted toward embedded systems. 1 Introduction

  17. SNL/CA Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2007-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  18. Energy Management and Control System: Desired Capabilities and Functionality

    SciTech Connect (OSTI)

    Hatley, Darrel D.; Meador, Richard J.; Katipamula, Srinivas; Brambley, Michael R.; Wouden, Carl

    2005-04-29T23:59:59.000Z

    This document discusses functions and capabilities of a typical building/facility energy management and control systems (EMCS). The overall intent is to provide a building operator, manager or engineer with basic background information and recommended functions, capabilities, and good/best practices that will enable the control systems to be fully utilized/optimized, resulting in improved building occupant quality of life and more reliable, energy efficient facilities.

  19. Using Energy Management Control Systems for HVAC Operational Diagnostics

    E-Print Network [OSTI]

    Stum, K.

    1998-01-01T23:59:59.000Z

    USING ENERGY MANAGEMENT CONTROL SYSTEMS FOR HVAC OPERATIONAL DIAGNOSTICS Karl Stum, P.E. Portland Energy Conservation, Inc. 92 1 SW Washington, Suite 3 12 Portland, OR 97205 503-248-4636 Fax 503-295-0820 ABSTRACT The power and flexibility... Proceedings, June 1997. Meyers, S.; E. Mills; A. Chen; L. Demsetz "Building Data Visualization for Diagnostics," ASHRAE Journal, June 1996. PECl (Portland Energy Conservation, Inc.). Energy Management C0ntrof Systems-A Practical Guiak, 1997. Sparks, R...

  20. Systems Engineering Introduction to Software Quality Management

    E-Print Network [OSTI]

    Bryson, Joanna J.

    for quality management ISO 9001:2000 is a generic model of the quality process; ISO 9001:2008 clarifies ISO 9001:2000 ISO 9001:2008 applicable to any organisation that designs, develops and maintains products (or services) ISO 9000-3 interprets 9001 for software dev. 12 Features of ISO 9001:2008 Organisational

  1. The Integrated Waste Tracking System - A Flexible Waste Management Tool

    SciTech Connect (OSTI)

    Anderson, Robert Stephen

    2001-02-01T23:59:59.000Z

    The US Department of Energy (DOE) Idaho National Engineering and Environmental Laboratory (INEEL) has fully embraced a flexible, computer-based tool to help increase waste management efficiency and integrate multiple operational functions from waste generation through waste disposition while reducing cost. The Integrated Waste Tracking System (IWTS)provides comprehensive information management for containerized waste during generation,storage, treatment, transport, and disposal. The IWTS provides all information necessary for facilities to properly manage and demonstrate regulatory compliance. As a platformindependent, client-server and Web-based inventory and compliance system, the IWTS has proven to be a successful tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of management flexibility.

  2. Establishing functional requirements for emergency management information systems

    SciTech Connect (OSTI)

    Reed, J.H.; Rogers, G.O.; Sorensen, J.H.

    1991-01-01T23:59:59.000Z

    The advancement of computer technologies has led to the development of a number of emergency management information systems (e.g., EIS, CAMEO, IEMIS). The design of these systems has tended to be technologically driven rather than oriented to meeting information management needs during an emergency. Of course, emergency management needs vary depending on the characteristics of the emergency. For example, in hurricanes, onset is typically slow enough to allow emergency managers to simulate evacuations dynamically while in chemical disasters onset may be sufficiently rapid to preclude such simulation(s). This paper describes a system design process in which the analysis of widely recognized emergency management functions was used to identify information requirements and the requisite software and hardware capabilities to deal with rapid onset, low probability, high consequence events. These requirements were then implemented as a prototype emergency management system using existing hardware and software to assure feasibility. Data, hardware, and software requirements were further developed, refined, and made more concrete through an iterative prototyping effort. This approach focuses attention directly on meeting emergency management information needs while avoiding unneeded technological innovations. 10 refs., 4 figs., 1 tab.

  3. Seasonal Performance Variations for Storm-Water Management Systems in Cold Climate Conditions

    E-Print Network [OSTI]

    headings: Stormwater management; Best management practice; Performance characteristics; Water qualitySeasonal Performance Variations for Storm-Water Management Systems in Cold Climate Conditions. An examination of six varied LID designs, in contrast with conventional best-management practices BMPs

  4. Appropriate Technologies and Systems to respond to Climate Change, Improved Water Resources Management, Waste Management and Sanitation

    E-Print Network [OSTI]

    Barthelat, Francois

    Resources Management, Waste Management and Sanitation A Review of Water Information Systems in the English availability, quality, use and demand. In this regard, Water Information Systems play a key role in the management of the resource. This paper examines the water information systems of St. Lucia, Jamaica

  5. Advanced Management of Compressed Air Systems

    Office of Energy Efficiency and Renewable Energy (EERE)

    Find out how a compressed air system works and the benefits of optimal compressed air system performance. This training is designed to help end users as well as industry solution providers learn...

  6. Managing nuclear predominant generating capacity

    SciTech Connect (OSTI)

    Bouget, Y.H.; Herbin, H.C.; Carbonnier, D.

    1998-07-01T23:59:59.000Z

    The most common belief, associated with nuclear power plant, leads to the conclusion that it can only operate, as a base load plant. This observation can be reversed, by just looking at large generating capacity, using an important nuclear generation mix. Nuclear plants may certainly load follow and contribute to the grid frequency control. The French example illustrates these possibilities. The reactor control of French units has been customized to accommodate the grid requests. Managing such a large nuclear plant fleet requires various actions be taken, ranging from a daily to a multi-annual perspective. The paper describes the various contributions leading to safe, reliable, well accepted and cost competitive nuclear plants in France. The combination of all aspects related to operations, maintenance scheduling, nuclear safety management, are presented. The use of PWR units carries considerable weight in economic terms, with several hundred million francs tied in with outage scheduling every year. This necessitates a global view of the entire generating system which can be mobilized to meet demand. There is considerable interaction between units as, on the one hand, they are competing to satisfy the same need, and, on the other hand, reducing maintenance costs means sharing the necessary resources, and thus a coordinated staggering of outages. In addition, nuclear fuel is an energy reserve which remains in the reactor for 3 or 4 years, with some of the fuel renewed each year. Due to the memory effect, the fuel retains a memory of past use, so that today's choices impact upon the future. A medium-term view of fuel management is also necessary.

  7. Managing Manure with Biogas Recovery Systems

    E-Print Network [OSTI]

    Mukhtar, Saqib

    emissions and capture biogas--a useful source of energy. About Anaerobic Digestion Biogas recovery systems manure in an oxygen-free environment. One of the natural prod- ucts of anaerobic digestion is biogas Digestion Biogas recovery systems are a proven technology. Currently, more than 30 digester systems

  8. MonteCarlo and Analytical Methods for Forced Outage Rate Calculations of Peaking Units 

    E-Print Network [OSTI]

    Rondla, Preethi 1988-

    2012-10-26T23:59:59.000Z

    pessimistic results owing to its time spent in the reserve shut down state. Therefore the normal two state representation of a generating unit is not adequate. A four state model was proposed by an IEEE committee to calculate the forced outage rate...

  9. Asymptotic Outage Performance of Power Allocation in Block-Fading Channels

    E-Print Network [OSTI]

    Guillén i Fàbregas, Albert

    .nguyen@postgrads.unisa.edu.au Albert Guill´en i F`abregas Department of Engineering University of Cambridge Cambridge CB2 1PZ, UK guillen@ieee.org Lars K. Rasmussen Institute for Telecommunications Research University of South Australia SA 5095, Australia lars.rasmussen@unisa.edu.au Abstract-- We characterize the asymptotic outage

  10. 96 IEEE power & energy magazine march/april 2005 THE MASSIVE POWER OUTAGE OF

    E-Print Network [OSTI]

    Amin, S. Massoud

    --settle for a substan- dard electricity infrastructure. We absolutely can meet the needs of a pervasively digital valued at US$358 billion. The electric power grid was historically operated by separate utilities; each96 IEEE power & energy magazine march/april 2005 T THE MASSIVE POWER OUTAGE OF August 2003

  11. Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona

    E-Print Network [OSTI]

    service. The reliability of electrical power is important because many other infrastructures are directly of the electric power distribution infrastructure. There are many studies on the vulnerability of infrastructuresEnvironmental determinants of unscheduled residential outages in the electrical power distribution

  12. Outage Detection in Power Distribution Networks with Optimally-Deployed Power Flow Sensors

    E-Print Network [OSTI]

    Zhao, Yue

    Outage Detection in Power Distribution Networks with Optimally-Deployed Power Flow Sensors Yue Zhao deployed real-time power flow sensors and that of load estimates via Advanced Metering Infrastructure (AMI of Naval Research, under Grant N00014-12-1-0767. where supervisory control and data acquisition (SCADA

  13. Outage Analysis of Multi-node Amplify-and-Forward Relay Networks

    E-Print Network [OSTI]

    Liu, K. J. Ray

    Outage Analysis of Multi-node Amplify-and-Forward Relay Networks Karim G. Seddik, Ahmed K. Sadek, Weifeng Su , and K. J. Ray Liu Department of Electrical and Computer Engineering, and Institute}@eng.umd.edu Department of Electrical Engineering, State University of New York (SUNY) at Buffalo, Buffalo, NY 14260, USA

  14. Cut-off Rate based Outage Probability Analysis of Frequency Hopping Mobile Radio under Jamming

    E-Print Network [OSTI]

    Yýlmaz, Özgür

    Cut-off Rate based Outage Probability Analysis of Frequency Hopping Mobile Radio under Jamming Conditions G¨okhan M. G¨uvensen Electrical and Electronics Eng. Dept. Middle East Technical University Ankara, Turkey Email: guvensen@metu.edu.tr Yalc¸in Tanik Electrical and Electronics Eng. Dept. Middle East

  15. The Information-Outage Probability of Finite-Length Codes over AWGN Channels

    E-Print Network [OSTI]

    Valenti, Matthew C.

    The Information-Outage Probability of Finite-Length Codes over AWGN Channels David Buckingham and Matthew C. Valenti Lane Department of Computer Science and Electrical Engineering West Virginia University March 19, 2008 Buckingham and Valenti ( Lane Department of Computer Science and Electrical Engineering

  16. Asymptotic Outage Analysis of General Motion-Invariant Ad Hoc Networks

    E-Print Network [OSTI]

    Haenggi, Martin

    Asymptotic Outage Analysis of General Motion-Invariant Ad Hoc Networks Riccardo Giacomelli Dept Krishna Ganti Dept. of Electrical and Computer Eng. University of Texas at Austin Austin, TX, USA E-mail: rganti@austin.utexas.edu Martin Haenggi Dept. of Electrical Engineering University of Notre Dame Notre

  17. The Approximation of Outage Probability and the Trade-off between Capacity and Diversity for the

    E-Print Network [OSTI]

    Scharf, Louis

    The Approximation of Outage Probability and the Trade-off between Capacity and Diversity for the Frequency-Selective Channel Zhifei Fan Department of Electrical and Computer Engineering Colorado State University Fort Collins, CO 80523 Email: fanz@engr.colostate.edu Louis Scharf Department of Electrical

  18. Prediction-Based Recovery from Link Outages in On-Board Mobile Communication Networks

    E-Print Network [OSTI]

    Libman, Lavy

    , such as those pro- posed for (and employed in) public transport vehicles, users are connected to a local network transport routes, and their repetitive nature, allows a certain degree of prediction of impending link extension known as Freeze-TCP, we study how the performance of the protocol depends on the outage prediction

  19. Environmental Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexas Energyof 2005Site-Level ExerciseMarchEnvironmental Management

  20. ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract ManagementDiscovering HowAnaDynamicGulfENSURING A SKILLED

  1. Lighting system with thermal management system having point contact synthetic jets

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Sharma, Rajdeep

    2013-12-10T23:59:59.000Z

    Lighting system having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system includes a plurality of synthetic jets. The synthetic jets are arranged within the lighting system such that they are secured at contact points.

  2. Graduate School of Creative Science and Engineering Department of Industrial and Management Systems Engineering

    E-Print Network [OSTI]

    Kaji, Hajime

    Graduate School of Creative Science and Engineering Department of Industrial and Management and Engineering Department of Industrial and Management Systems Engineering Research Instruction Application; Graduate School of Creative Science and Engineering Department of Industrial and Management Systems

  3. A Water and Energy Management System for Technical and Economic Control

    E-Print Network [OSTI]

    Steinmetz, C. O.; Cotton, I. J.; Bomar, T. M.; Roddy, W. R.

    1979-01-01T23:59:59.000Z

    Management for effective control must encompass readily available technology. Technology must be coupled with precise compatible management practices. A management system for total economic control can be constructed for specific systems...

  4. Architecture for a Generalized Emergency Management Software System

    SciTech Connect (OSTI)

    Hoza, Mark; Bower, John C.; Stoops, LaMar R.; Downing, Timothy R.; Carter, Richard J.; Millard, W. David

    2002-12-19T23:59:59.000Z

    The Federal Emergency Management Information System (FEMIS) was originally developed for the Chemical Stockpile Emergency Preparedness Program (CSEPP). It has evolved from a CSEPP-specific emergency management software system to a general-purpose system that supports multiple types of hazards. The latest step in the evolution is the adoption of a hazard analysis architecture that enables the incorporation of hazard models for each of the hazards such that the model is seamlessly incorporated into the FEMIS hazard analysis subsystem. This paper describes that new architecture.

  5. Integrated Distribution Management System for Alabama Principal Investigator

    SciTech Connect (OSTI)

    Schatz, Joe

    2013-03-31T23:59:59.000Z

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables data access and enterprise application integration.

  6. Web Service Access Management for Integration with Agent Systems

    E-Print Network [OSTI]

    Web Service Access Management for Integration with Agent Systems B.J. Overeinder, P.D. Verkaik, from the perspective of agent systems (and not as is gen- erally the case by web service providers). Mediating between web service requests from (virtual) organizations of agents, the web ser- vice gateway

  7. (UR-16) Integrated Framework for Lifecycle Infrastructure Management Systems

    E-Print Network [OSTI]

    Hammad, Amin

    1 (UR-16) Integrated Framework for Lifecycle Infrastructure Management Systems Cheng Zhang1 Elaheh throughout the lifecycle of an infrastructure system, such as a bridge, including construction, inspection only limited support for representing and visualizing this information. Using a 4D product model

  8. Statistical tools for prognostics and health management of complex systems

    SciTech Connect (OSTI)

    Collins, David H [Los Alamos National Laboratory; Huzurbazar, Aparna V [Los Alamos National Laboratory; Anderson - Cook, Christine M [Los Alamos National Laboratory

    2010-01-01T23:59:59.000Z

    Prognostics and Health Management (PHM) is increasingly important for understanding and managing today's complex systems. These systems are typically mission- or safety-critical, expensive to replace, and operate in environments where reliability and cost-effectiveness are a priority. We present background on PHM and a suite of applicable statistical tools and methods. Our primary focus is on predicting future states of the system (e.g., the probability of being operational at a future time, or the expected remaining system life) using heterogeneous data from a variety of sources. We discuss component reliability models incorporating physical understanding, condition measurements from sensors, and environmental covariates; system reliability models that allow prediction of system failure time distributions from component failure models; and the use of Bayesian techniques to incorporate expert judgments into component and system models.

  9. Organization as Innovation: China’s Human Spaceflight Program’s Efforts to Instill a Quality Management System

    E-Print Network [OSTI]

    Pollpeter, Kevin

    2011-01-01T23:59:59.000Z

    to Instill a Quality Management System Kevin Pollpeterthat China’s quality management system was not suitable to

  10. WATER DATA MANAGEMENT SYSTEMS INTEGRATIONS WITH MODELS

    E-Print Network [OSTI]

    Rhode Island, University of

    Acquisition (SCADA) system that can control operations in treatment plants, as well as continuously check and SCADA interfaces for even more integrated analyses, which is important since many suppliers are implementing SCADA systems. However, only about thirty-five (35) percent of the suppliers have a functioning

  11. Best Management Practice #8: Steam Boiler Systems

    Broader source: Energy.gov [DOE]

    Boilers and steam generators are commonly used in large heating systems, institutional kitchens, or in facilities where large amounts of process steam are used. This equipment consumes varying amounts of water depending on system size, the amount of steam used, and the amount of condensate returned.

  12. Demand Side Management (DSM) Through Absorption Refrigeration Systems

    E-Print Network [OSTI]

    Chao, P. Y.; Shukla, D.; Amarnath, A.; Mergens, E.

    DEMAND SIDE MANAGEMENT (DSM) TIIROUGH ABSORPTION REFRIGERATION SYSTEMS Peter Y. Chao, PhD, Deepak Shukla, PhD, Sr. Process Engineers, TENSA Services, Inc. Ammi Amarnath, Sr. Project Manager, Electrical Power Research Institute Ed. Mergens.... They are Peak Clipping, Valley filling, Load Shifting, Strategic Conservation, Strategic Load Growth, and Flexible Load Shaping. Absorption Refrigeration from waste heat offers a viable option for DSM. This will either reduce the peak load (peak clipping...

  13. We use the OPA complex systems model of the power transmission system to investigate the effect of a series of

    E-Print Network [OSTI]

    Dobson, Ian

    generation dispatch and represents blackouts caused by randomly triggered cascading line outages the robustness of the Electric Power Transmission systems, the understanding of the system wide effect of various, cascading line outages, and the increases in system capacity caused by the engineering responses

  14. ESDIS_ISO Trng_Nov2010.docx Management System Training

    E-Print Network [OSTI]

    Christian, Eric

    Quality Manual and supporting directives and procedures identify the Management System (MS) process: MS was formerly called QMS, Quality Management System) Management System Training Requirement: AllESDIS_ISO Trng_Nov2010.docx Management System Training ESDIS Project (November 2010) The Goddard

  15. Use of expert systems in nuclear power plants

    SciTech Connect (OSTI)

    Uhrig, R.E.

    1989-01-01T23:59:59.000Z

    The application of technologies, particularly expert systems, to the control room activities in a nuclear power plant has the potential to reduce operator error and increase plant safety, reliability, and efficiency. Furthermore, there are a large number of nonoperating activities (testing, routine maintenance, outage planning, equipment diagnostics, and fuel management) in which expert systems can increase the efficiency and effectiveness of overall plant and corporate operations. This document presents a number of potential applications of expert systems in the nuclear power field. 36 refs., 2 tabs.

  16. Voices of Experience | Advanced Distribution Management Systems...

    Office of Environmental Management (EM)

    systems and a move from reactive to predictive models increases the need for electrical engineering knowledge and IT skills in the operations center as well as in the fi eld. It...

  17. Certified Practitioner in Energy Management Systems Training...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Training February 24, 2015 8:00AM CST to February 27, 2015 4:00PM CST Location Midwest Energy Efficiency Alliance 20 N Wacker Dr. Suite 1301 Chicago, IL 60606 Learn more...

  18. TWRS systems engineering software configuration management plan

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-09T23:59:59.000Z

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  19. ExxonMobil Global Energy Management System

    E-Print Network [OSTI]

    Roberto, F.

    of our refineries and chemical plants. The system builds on international best practices and benchmarking to identify energy efficiencies. Launched in 2000, it utilizes a common methodology to identify performance gaps, implement closure plans, sustain...

  20. Power Contro Energy Management and Market Systems

    SciTech Connect (OSTI)

    Tom Addison; Andrew Stanbury

    2005-12-15T23:59:59.000Z

    More efficient use of the nation's electrical energy infrastructure will result in minimizing the cost of energy to the end user. Using real time electrical market information coupled with defined rules, market opportunities can be identified that provide economic benefit for both users and marketers of electricity. This report describes the design of one such system and the features a fully functional system would provide. This report documents several investigated methods of controlling load diversity or shifting.

  1. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.2

    SciTech Connect (OSTI)

    Burford, M.J.; Burnett, R.A.; Curtis, L.M. [and others

    1996-05-01T23:59:59.000Z

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS system package. System administrators, database administrators, and general users can use this guide to install, configure, and maintain the FEMIS client software package. This document provides a description of the FEMIS environment; distribution media; data, communications, and electronic mail servers; user workstations; and system management.

  2. System team composition for a complex system to enable integration and attribute management

    E-Print Network [OSTI]

    Krishnaswami, Ram, 1966-

    2004-01-01T23:59:59.000Z

    The automatic transmission is a very complex system in a modern automobile with several hundred components performing mechanical, hydraulic and electronic functions. System integration and attribute management are key ...

  3. Abstract--Autonomic computing systems are intelligent systems that manage their own performance. An important characteristic

    E-Print Network [OSTI]

    their workloads. For a complex system such as the database management system (DBMS) to be self-managing, it should be adaptive to the type of the workload put upon it. Identifying the workload type is key to tuning a DBMS that automatically recognizes the workload type and assesses each type's concentration. Since a DBMS may experience

  4. Federal Emergency Management Information System (FEMIS). Data Management Guide, FEMIS: Phase 1, Version 1.1u

    SciTech Connect (OSTI)

    Burnett, R.A.; Johnson, D.M.; Johnson, S.M. [and others

    1995-06-01T23:59:59.000Z

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the U.S. Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system.

  5. Standard Data Exchanges for Distribution System Management

    SciTech Connect (OSTI)

    Thomas E. McDermott

    2007-10-05T23:59:59.000Z

    Databases and software tools for electric power distribution systems have not been integrated, and this leads to extra costs and restrictions imposed on utilities and other stakeholders. For example, distributed resource integration studies and modern grid technology assessments are more difficult and costly. New vendors face high market entry barriers, because it’s necessary to interface with large and customized data systems at each potential utility customer. This project promotes data and software tool integration, through a set of data translators based on a common object model. The data translators are delivered as open-source software, using appropriate Web software technologies. The parties who benefit include electric utilities (and their ratepayers), researchers at government laboratories and universities, small software companies wishing to enter the electric utility market, and parties wishing to interconnect distributed generation to a utility system.

  6. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    SciTech Connect (OSTI)

    Pieck, Martin [Los Alamos National Laboratory; Erickson, John E [Los Alamos National Laboratory; Gulley, Mark S [Los Alamos National Laboratory; Jones, Kevin W [Los Alamos National Laboratory; Rybarcyk, Larry J [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  7. A management information system model for convenience stores 

    E-Print Network [OSTI]

    Moede, Eric Arne

    1978-01-01T23:59:59.000Z

    Najor Subject: Agricultural Economics A MANAGEMENT INFORMATION SYSTEM MODEL FOR CONVENIENCE STORES A Thesfs by ERIC ARNE MOEDE Approved as to style and content by: Chairman of o ittee Dr. Willfam J. stine Head of Department Dr. Clfve R. Harston... Member Dr. Samuel M. Gillespie Mem er Dr, John I. Reynolds Member Dr. Thomas L. Sporleder December 1978 ABSTPJ CT A Management Information System I'1odel For Convenience Stores (December lg78 l Eric Arne I'loede, B. B. A. , Texas ARM University...

  8. Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities Coordination\\3729 Lecturn (Creme) Operation with JED Controllers.doc

    E-Print Network [OSTI]

    Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 the following instructions. #12;Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities Coordination\\3729 Lecturn

  9. Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities Coordination\\3735 LG Plasma Televisions.doc

    E-Print Network [OSTI]

    Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 for this process to complete. #12;Master Document located at: W:\\fas\\fas-Quality Management System\\Quality Management System\\01 Quality System\\02 WORK INSTRUCTIONS\\3700-3899 Facilities Coordination\\3735 LG Plasma

  10. Subsurface materials management and containment system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kostelnik, Kevin M.; Sloan, Paul A.

    2006-10-17T23:59:59.000Z

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  11. Subsurface materials management and containment system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kosteinik, Kevin M.; Sloan, Paul A.

    2004-07-06T23:59:59.000Z

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  12. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    SciTech Connect (OSTI)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01T23:59:59.000Z

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  13. Stochastic Modeling of a Power-Managed System: Construction and Optimization

    E-Print Network [OSTI]

    Qiu, Qinru

    Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu, CA 90089 Abstract -- The goal of a dynamic power management policy is to reduce the power consumption of a power-managed electronic system. We formulate the problem of system-level power management

  14. Stochastic Modeling of a Power-Managed System: Construction and Optimization

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu, CA 90089 Abstract -- The goal of a dynamic power management policy is to reduce the power consumption of a power-managed electronic system. We formulate the problem of system-level power management

  15. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 & 2

    SciTech Connect (OSTI)

    SETH, S.S.

    2000-01-10T23:59:59.000Z

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system.

  16. emergency management systems | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russian NuclearNational5/%2A en Office|3 Issue 25systems |

  17. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3

    SciTech Connect (OSTI)

    Burford, M.J.; Burnett, R.A.; Downing, T.R. [and others

    1996-12-01T23:59:59.000Z

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.

  18. SDAMS: SPOrt Data Archiving and Management System

    E-Print Network [OSTI]

    L. Nicastro; G. Calderone; for the SPOrt collaboration

    2002-01-14T23:59:59.000Z

    SDAMS is the ensemble of database + software packages aimed to the archiving, quick-look analysis, off-line analysis, network accessibility and plotting of the SPOrt produced data. Many of the aspects related to data archiving, analysis and distribution are common to almost all the astronomical experiments. SDAMS ambition is to face and solve problems like accessibility and portability of the data on any hardware/software platform in a way as simpler as possible, though effective. The system is conceived in a way to be used either by the scientific community interested in background radiation studies or by a wider public with low or null knowledge of the subject. The user authentication system allows us to apply different levels of access, analysis and data retrieving. SDAMS will be accessible through any Web browser though the most efficient way to use it is by writing simple programs. Graphics and images useful for outreach purposes will be produced and put on the Web on a regular basis.

  19. A convex approximation approach to Weighted Sum Rate Maximization of Multiuser MISO Interference Channel under outage constraints

    E-Print Network [OSTI]

    Li, Wei-Chiang; Lin, Che; Chi, Chong-Yung

    2010-01-01T23:59:59.000Z

    This paper considers weighted sum rate maximization of multiuser multiple-input single-output interference channel (MISO-IFC) under outage constraints. The outage-constrained weighted sum rate maximization problem is a nonconvex optimization problem and is difficult to solve. While it is possible to optimally deal with this problem in an exhaustive search manner by finding all the Pareto-optimal rate tuples in the (discretized) outage-constrained achievable rate region, this approach, however, suffers from a prohibitive computational complexity and is feasible only when the number of transmitter-receive pairs is small. In this paper, we propose a convex optimization based approximation method for efficiently handling the outage-constrained weighted sum rate maximization problem. The proposed approximation method consists of solving a sequence of convex optimization problems, and thus can be efficiently implemented by interior-point methods. Simulation results show that the proposed method can yield near-optim...

  20. 1186 IEEE TRANSACTIONS ON INFORMATION THEORY, VOL. 54, NO. 3, MARCH 2008 DiversityMultiplexing Tradeoff and Outage

    E-Print Network [OSTI]

    Lee, Yong Hoon

    is derived. The DMT and outage performance are also analyzed for Rician mul- tiple-input­single-output (MISO- icantly improve link reliability by transmit diversity such as space­time coding [4], [5]. However

  1. Computerized management report system for monitoring manpower and cost

    SciTech Connect (OSTI)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01T23:59:59.000Z

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

  2. Aurora: A Data Stream Management System , D. Carney

    E-Print Network [OSTI]

    Tatbul, Nesime

    Aurora: A Data Stream Management System D. Abadi , D. Carney§ , U. �etintemel§ , M. Cherniack , C activity, and processing them for purposes of filtering, aggregation, reduction, and correlation. Aurora [1 OF AURORA Aurora is being designed to deal with large numbers of asynchronous, push-based data streams

  3. Environmental Management System 2 2005 Site environmental report2-

    E-Print Network [OSTI]

    Environmental Management System 2 2005 Site environmental report2- One of Brookhaven National Laboratory's highest priorities is ensuring that its environmental performance measures up to its world of DOE, takes environmental stewardship very seriously. As part of BSA's commitment to environmentally

  4. Recommended Academic Plan for Agricultural Systems Management (ASM) University Park

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for Agricultural Systems Management (ASM) University Park Effective requirements. GWS, GHA, GQ, GN, GA, GH, and GS are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States

  5. Recommended Academic Plan for Agricultural Systems Management (ASM) Commonwealth Campuses

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for Agricultural Systems Management (ASM) Commonwealth Campuses Effective Education requirements. GWS, GHA, GQ, GN, GA, GH, and GS are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States

  6. Nuclear Materials Management and Safeguards System Reporting and Data Submission

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-02-10T23:59:59.000Z

    The manual provides clear and detailed instructions and procedures for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE 5633.3B. Canceled by DOE M 474.1-2A.

  7. SOLAR IRRADIANCE FORECASTING FOR THE MANAGEMENT OF SOLAR ENERGY SYSTEMS

    E-Print Network [OSTI]

    Heinemann, Detlev

    SOLAR IRRADIANCE FORECASTING FOR THE MANAGEMENT OF SOLAR ENERGY SYSTEMS Detlev Heinemann Oldenburg.girodo@uni-oldenburg.de ABSTRACT Solar energy is expected to contribute major shares of the future global energy supply. Due to its and solar energy conversion processes has to account for this behaviour in respective operating strategies

  8. Managing Abnormal Operation through Process Integration and Cogeneration Systems

    E-Print Network [OSTI]

    Kamrava, Serveh

    2014-08-05T23:59:59.000Z

    & Webster Company, Linde company method. *“Part of this chapter is reprinted with permission from “Managing abnormal operation through process integration and cogeneration systems” by Serveh... (75% for ethane to 28% for hydrogenated gasoline). In Linde method ethylene and propylene is produced from ethane to naphta hydrocarbons by thermal cracking method. Ethylene efficiency is different for different feedstock. For gasoline, naphta...

  9. PROJECT GOALS Use electricity accounts and Building Management System

    E-Print Network [OSTI]

    PROJECT GOALS · Use electricity accounts and Building Management System (BMS) data to describe and annual rates of consumption. DESCRIPTION Approximately 82 per cent of the NGA electricity consumption can. Fluctuations in heat or humidity are therefore likely to have a significant influence on electricity

  10. Obsolescence : a systems engineering and management approach for complex systems

    E-Print Network [OSTI]

    Devereaux, Jaime E. (Jaime Erin)

    2010-01-01T23:59:59.000Z

    Obsolescence mitigation is an increasingly important aspect of large systems development & maintenance that has often only been considered once obsolescence is imminent. For long lifecycle systems, this has become a major ...

  11. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01T23:59:59.000Z

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  12. An expert system for PWR core operation management

    SciTech Connect (OSTI)

    Ida, Toshio; Masuda, Masahiro; Nishioka, Hiromasa

    1988-01-01T23:59:59.000Z

    Planning for restartup after planned or unplanned reactor shutdown and load-follow operations is an important task in the core operation management of pressurized water reactors (PWRs). These planning problems have been solved by planning experts using their expertise and the computational prediction of core behavior. Therefore, the quality of the plan and the time consumed in the planning depend heavily on the skillfulness of the planning experts. A knowledge engineering approach has been recently considered as a promising means to solve such complicated planning problems. Many knowledge-based systems have been developed so far, and some of them have already been applied because of their effectiveness. The expert system REPLEX has been developed to aid core management engineers in making a successful plan for the restartup or the load-follow operation of PWRs within a shorter time. It can maintain planning tasks at a high-quality level independent of the skillfulness of core management engineers and enhance the efficiency of management. REPLEX has an explanation function that helps user understanding of plans. It could be a useful took, therefore, for the training of core management engineers.

  13. Integrated Baseline System (IBS). Version 2.0, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States); Bower, J.C. [Bower Software Services, Kennewick, WA (United States)

    1994-03-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This User Guide explains how to start and use the IBS program, which is designed to help civilian emergency management personnel to plan for and support their responses to a chemical-releasing event at a military chemical stockpile. The intended audience for this document is all users of the IBS, especially emergency management planners and analysts.

  14. Automated Transportation Management System (ATMS) Software Project Management Plan (SPMP). Revision 2

    SciTech Connect (OSTI)

    Weidert, R.S.

    1995-05-26T23:59:59.000Z

    As a cabinet level federal agency with a diverse range of missions and an infrastructure spanning the United States, the US Department of Energy (DOE) has extensive freight transportation requirements. Performance and management of this freight activity is a critical function. DOE`s Transportation Management Division (TMD) has an agency-wide responsibility for overseeing transportation activities. Actual transportation operations are handled by government or contractor staff at the field locations. These staff have evolved a diverse range of techniques and procedures for performing transportation functions. In addition to minimizing the economic impact of transportation on programs, facility transportation staff must be concerned with the increasingly complex task of complying with complex shipment safety regulations. Maintaining the department`s safety record for shipping hazardous and radioactive materials is a primary goal. Use of automation to aid transportation functions is not widespread within DOE, though TMD has a number of software systems designed to gather and analyze data pertaining to field transportation activities. These systems are not integrated. Historically, most field facilities have accomplished transportation-related tasks manually or with minimal computer assistance. At best, information and decision support systems available to transportation staffs within the facilities are fragmented. In deciding where to allocate resources for automation, facility managers have not tended to give the needs of transportation departments a high priority. This diversity causes TMD significant difficulty in collecting data for use in managing department-wide transportation activities.

  15. MANAGEMENT INFORMATION SYSTEMS (MIS) In a technology bound society, companies rely on

    E-Print Network [OSTI]

    to the $44,000 Clay Barton Scholarship. Admission When you choose to major in Management Information Systems business, management, marketing, operations management, and personal selling. The W. Frank Barton School

  16. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  17. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  18. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  19. Spanish high level radioactive waste management system issues

    SciTech Connect (OSTI)

    Ulibarri, A.; Veganzones, A. [ENRESA, Madrid (Spain)

    1993-12-31T23:59:59.000Z

    The Empresa Nacional de Residuous Radiactivos, S.A. (ENRESA) was set up in 1984 as a state-owned limited liability company to be responsible for the management of all kinds of radioactive wastes in Spain. This paper provides an overview of the strategy and main lines of action stated in the third General Radioactive Waste Plan, currently in force, for the management of spent nuclear fuel and high-level wastes, as well as an outline of the main related projects, either being developed or foreseen. Aspects concerning the organizational structure, the economic and financing system and the international co-operational are also included.

  20. FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT MEASURES FOR FLOOD MANAGEMENT SYSTEMS1

    E-Print Network [OSTI]

    Tullos, Desiree

    FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT variability/change; risk assessment; flood management; water resources flexibility.) DiFrancesco, Kara N of Assessment Measures for Flood Management Systems. Journal of the American Water Resources Association (JAWRA

  1. DOE-RL Integrated Safety Management System Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-09-01T23:59:59.000Z

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  2. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2010-02-01T23:59:59.000Z

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  3. A comparison of ISO 14001 to other related environmental management systems and tools

    SciTech Connect (OSTI)

    White, S.E.; Byron, D.F.; Livingston, B.L.

    1995-08-01T23:59:59.000Z

    Efficient environmental management is of increasing priority for the industrial sector. The achievement of ISO 14001 certification will demonstrate that the environmental management system meets or exceeds industry standards since this standard will be the accepted international measure of environmental management. A review of published environmental management systems and tools was conducted to ensure all aspects of environmental management are covered in the establishment or formalization of an environmental management system. The objective of this effort is to compare the ISO 14001 standard with other environmental management systems and tools.

  4. Tank monitor and control system (TMACS) software configuration management plan

    SciTech Connect (OSTI)

    GLASSCOCK, J.A.

    1999-05-13T23:59:59.000Z

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  5. Concept of Operations for Real-time Airborne Management System

    SciTech Connect (OSTI)

    Barr, Jonathan L.; Taira, Randal Y.; Orr, Heather M.

    2013-03-04T23:59:59.000Z

    The purpose of this document is to describe the operating concepts, capabilities, and benefits of RAMS including descriptions of how the system implementations can improve emergency response, damage assessment, task prioritization, and situation awareness. This CONOPS provides general information on operational processes and procedures required to utilize RAMS, and expected performance benefits of the system. The primary audiences for this document are the end users of RAMS (including flight operators and incident commanders) and the RAMS management team. Other audiences include interested offices within the Department of Homeland Security (DHS), and officials from other state and local jurisdictions who want to implement similar systems.

  6. Enhanced Reliability of Photovoltaic Systems with Energy Storage and Controls

    SciTech Connect (OSTI)

    Manz, D.; Schelenz, O.; Chandra, R.; Bose, S.; de Rooij, M.; Bebic, J.

    2008-02-01T23:59:59.000Z

    This report summarizes efforts to reconfigure loads during outages to allow individual customers the opportunity to enhance the reliability of their electric service through the management of their loads, photovoltaics, and energy storage devices.

  7. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01T23:59:59.000Z

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  8. SystemC Analysis of a new Dynamic Power Management Architecture Massimo Conti

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    SystemC Analysis of a new Dynamic Power Management Architecture Massimo Conti Universitŕ dynamic power management architecture of a System on Chip. The Power State Machine describing the status Power Management Architecture Dynamic Power Management (DPM) is a design methodology that dynamically

  9. OS-Directed Power Management for Mobile Electronic Systems Qinru Qiu, Qing Wu and Massoud Pedram

    E-Print Network [OSTI]

    Pedram, Massoud

    OS-Directed Power Management for Mobile Electronic Systems Qinru Qiu, Qing Wu and Massoud Pedram management. We model a power-managed system using a continuous-time Markov decision process and solve for the optimal power management policy using a mathematical programming technique. Next we extend the model

  10. Security Requirements for Management Systems using Mobile Agents H. Reiser G. Vogt

    E-Print Network [OSTI]

    Security Requirements for Management Systems using Mobile Agents H. Reiser G. Vogt Munich Network Management Team Munich Network Management Team University of Munich, Germany Munich University of Technology and distributed management systems based on mobile agents have certain advantages over centralized and static

  11. System Support for Software Fault Tolerance in Highly Available Database Management Systems

    E-Print Network [OSTI]

    California at Irvine, University of

    of several techniques for early error detection and fast recovery in a database management system (DBMS system and the IMS DBMS and DB2 DBMS. The study classifies errors by the type of coding mistake system allow the DBMS to guard (write-protect) #12;2 some of its internal data structures. Guarding DBMS

  12. Outage Efficient Strategies for Network MIMO with Partial CSIT

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    ) beamforming in a distributed manner, which creates K parallel MISO channels. Based on the statistical reliability to individual users. I. INTRODUCTION Recently, network MIMO (where neighboring BSs are con- nected of a multi-cell downlink system for B = K = 3 and M = 3. Assuming a reliable (possibly wired) backbone link

  13. Energy management system functions in deregulated power systems

    E-Print Network [OSTI]

    Magnago, Fernando Hugo

    1997-01-01T23:59:59.000Z

    covariance matrix 8: E(uwr) = 8 = 0 0 . . cr This means that the measurement errors are independent with variances o;. As mentioned before, measurements are composed of power injections, power flows, and voltages. Vector h(z, ) represents the non linear..., nonetheless LAV reject INJ 4 if this injection measurement contains a bad data with 5 incident flows measurements. For INJ 10 in the 30-bus system, the cut oR' value is 16. 01 and again 24 Table II. IEEE 57-bus system: Variation of PS for INJ 13...

  14. Energy implications of integrated solid waste management systems. Final report

    SciTech Connect (OSTI)

    Little, R.E.; McClain, G.; Becker, M.; Ligon, P.; Shapiro, K.

    1994-07-01T23:59:59.000Z

    This study develops estimates of energy use and recovery from managing municipal solid waste (MSW) under various collection, processing, and disposal scenarios. We estimate use and recovery -- or energy balance -- resulting from MSW management activities such as waste collection, transport, processing, and disposal, as well as indirect use and recovery linked to secondary materials manufacturing using recycled materials. In our analysis, secondary materials manufacturing displaces virgin materials manufacturing for 13 representative products. Energy implications are expressed as coefficients that measure the net energy saving (or use) of displacing products made from virgin versus recycled materials. Using data developed for the 1992 New York City Master Plan as a starting point, we apply our method to an analysis of various collection systems and 30 types of facilities to illustrate bow energy balances shift as management systems are modified. In sum, all four scenarios show a positive energy balance indicating the energy and advantage of integrated systems versus reliance on one or few technology options. That is, energy produced or saved exceeds the energy used to operate the solid waste system. The largest energy use impacts are attributable to processing, including materials separation and composting. Collection and transportation energy are relatively minor contributors. The largest two contributors to net energy savings are waste combustion and energy saved by processing recycled versus virgin materials. An accompanying spatial analysis methodology allocates energy use and recovery to New York City, New York State outside the city, the U.S., and outside the U.S. Our analytical approach is embodied in a spreadsheet model that can be used by energy and solid waste analysts to estimate impacts of management scenarios at the state and substate level.

  15. Development of the RFID System for nuclear materials management.

    SciTech Connect (OSTI)

    Chen, K.; Tsai, H.; Liu, Y. Y. (Decision and Information Sciences)

    2008-01-01T23:59:59.000Z

    Radio frequency identification (RFID) is one of today's most rapidly growing technologies in the automatic data collection industry. Although commercial applications are already widespread, the use of this technology for managing nuclear materials is only in its infancy. Employing an RFID system has the potential to offer an immense payback: enhanced safety and security, reduced need for manned surveillance, real-time access to status and event history data, and overall cost-effectiveness. The Packaging Certification Program (PCP) in the U.S. Department of Energy's (DOE's) Office of Environmental Management (EM), Office of Packaging and Transportation (EM-63), is developing an RFID system for nuclear materials management. The system consists of battery-powered RFID tags with onboard sensors and memories, a reader network, application software, a database server and web pages. The tags monitor and record critical parameters, including the status of seals, movement of objects, and environmental conditions of the nuclear material packages in real time. They also provide instant warnings or alarms when preset thresholds for the sensors are exceeded. The information collected by the readers is transmitted to a dedicated central database server that can be accessed by authorized users across the DOE complex via a secured network. The onboard memory of the tags allows the materials manifest and event history data to reside with the packages throughout their life cycles in storage, transportation, and disposal. Data security is currently based on Advanced Encryption Standard-256. The software provides easy-to-use graphical interfaces that allow access to all vital information once the security and privilege requirements are met. An innovative scheme has been developed for managing batteries in service for more than 10 years without needing to be changed. A miniature onboard dosimeter is being developed for applications that require radiation surveillance. A field demonstration of the RFID system was recently conducted to assess its performance. The preliminary results of the demonstration are reported in this paper.

  16. International Border Management Systems (IBMS) Program : visions and strategies.

    SciTech Connect (OSTI)

    McDaniel, Michael; Mohagheghi, Amir Hossein

    2011-02-01T23:59:59.000Z

    Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

  17. Airborne Multisensor Pod System (AMPS) data management overview

    SciTech Connect (OSTI)

    Wiberg, J.D.; Blough, D.K.; Daugherty, W.R.; Hucks, J.A.; Gerhardstein, L.H.; Meitzler, W.D.; Melton, R.B.; Shoemaker, S.V.

    1994-09-01T23:59:59.000Z

    An overview of the Data Management Plan for the Airborne Multisensor Pod System (AMPS) pro-grain is provided in this document. The Pacific Northwest Laboratory (PNL) has been assigned the responsibility of data management for the program, which includes defining procedures for data management and data quality assessment. Data management is defined as the process of planning, acquiring, organizing, qualifying and disseminating data. The AMPS program was established by the U.S. Department of Energy (DOE), Office of Arms Control and Non-Proliferation (DOE/AN) and is integrated into the overall DOE AN-10.1 technology development program. Sensors used for collecting the data were developed under the on-site inspection, effluence analysis, and standoff sensor program, the AMPS program interacts with other technology programs of DOE/NN-20. This research will be conducted by both government and private industry. AMPS is a research and development program, and it is not intended for operational deployment, although the sensors and techniques developed could be used in follow-on operational systems. For a complete description of the AMPS program, see {open_quotes}Airborne Multisensor Pod System (AMPS) Program Plan{close_quotes}. The primary purpose of the AMPS is to collect high-quality multisensor data to be used in data fusion research to reduce interpretation problems associated with data overload and to derive better information than can be derived from any single sensor. To collect the data for the program, three wing-mounted pods containing instruments with sensors for collecting data will be flight certified on a U.S. Navy RP-3A aircraft. Secondary objectives of the AMPS program are sensor development and technology demonstration. Pod system integrators and instrument developers will be interested in the performance of their deployed sensors and their supporting data acquisition equipment.

  18. Spatio-Temporal Data Management Using Object Lifecycles A Case Study of the Australian Capital Territory Spatial Data Management System

    E-Print Network [OSTI]

    Stock, Kristin

    Territory Spatial Data Management System Dr Kristin Stock Abstract The representation of time in spatial Management System. Dr Kristin Stock ACT Planning and Land Authority 16 Challis Street Dickson ACT 2602 relationships might take. While these methods have become increasingly sophisticated and model reality

  19. U-205: RSA Access Manager Session Replay Flaw Lets Remote Users Access the System

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in RSA Access Manager. A remote user can gain access to the target system.

  20. Trends in Energy Management Technology - Part 4: Review ofAdvanced Applications in Energy Management, Control, and InformationSystems

    SciTech Connect (OSTI)

    Yee, Gaymond; Webster, Tom

    2003-08-01T23:59:59.000Z

    In this article, the fourth in a series, we provide a review of advanced applications in Energy Management, Control, and Information Systems (EMCIS). The available features for these products are summarized and analyzed with regard to emerging trends in EMCIS and potential benefits to the Federal sector. The first article [1] covered enabling technologies for emerging energy management systems. The second article [2] serves as a basic reference for building control system (BCS) networking fundamentals and includes an assessment of current approaches to open communications. The third article [3] evaluated several products that exemplify the current state of practice in EMCIS. It is important for energy managers in the Federal sector to have a high level of knowledge and understanding of these complex energy management systems. This series of articles provides energy practitioners with some basic informational and educational tools to help make decisions relative to energy management systems design, specification, procurement, and energy savings potential.

  1. FAILURE DETECTION ROUTINE FOR GRID CONNECTED PV SYSTEMS AS PART OF THE PVSAT-2 PROJECT

    E-Print Network [OSTI]

    Heinemann, Detlev

    Dept. Of Electrical Engineering, University of Applied Science (FH) Magdeburg-Stendal. D-39114 failures, e.g. shading, string or module failure, part time outages, snow cover, soiling and wrong inverter, the maintenance effort of PV systems is reduced und system outage time is minimised. The Failure Detection Routine

  2. Conceptual modular description of the high-level waste management system for system studies model development

    SciTech Connect (OSTI)

    McKee, R.W.; Young, J.R.; Konzek, G.J.

    1992-08-01T23:59:59.000Z

    This document presents modular descriptions of possible alternative components of the federal high-level radioactive waste management system and the procedures for combining these modules to obtain descriptions for alternative configurations of that system. The 20 separate system component modules presented here can be combined to obtain a description of any of the 17 alternative system configurations (i.e., scenarios) that were evaluated in the MRS Systems Studies program (DOE 1989a). First-approximation descriptions of other yet-undefined system configurations could also be developed for system study purposes from this database. The descriptions include, in a modular format, both functional descriptions of the processes in the waste management system, plus physical descriptions of the equipment and facilities necessary for performance of those functions.

  3. Tank Waste Remediation Systems (TWRS) Configuration Management Implementation Plan

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-12-18T23:59:59.000Z

    The Tank Waste Configuration Management (TWRS) Configuration Management Implementation Plan descibes the execution of the configuration management (CM) that the contractor uses to manage and integrate its programmatic and functional operations to perform work.

  4. Management of Imported Fire Ants in Cattle Production Systems

    E-Print Network [OSTI]

    Fuchs, Thomas W.; Drees, Bastiaan M.

    2004-03-31T23:59:59.000Z

    This publication can help ranch managers develop integrated pest management plans for managing fire ant problems in cattle operations. It covers the specifics of managing fire ants in hay pastures and rangelands, around farm ponds, and near...

  5. Substation based data interpretation techniques for improved power system management

    SciTech Connect (OSTI)

    Booth, C.; McDonald, J.R. [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering] [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering; Laycock, W.J.

    1997-04-01T23:59:59.000Z

    There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

  6. Environmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    System (ISMS) integrates environment, safety, and health management into all work planning and execution.4, Safety Management System Policy, are: § DEFINE THE SCOPE OF WORK: Missions are translated into workEnvironmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  7. Dynamic Power Management in a Mobile Multimedia System with Guaranteed Quality-of-Service*

    E-Print Network [OSTI]

    Qiu, Qinru

    Dynamic Power Management in a Mobile Multimedia System with Guaranteed Quality-of-Service* Qinru address the problem of dynamic power management in a distributed multimedia system with a required quality of the power-managed multimedia system under general QoS constraints. Based on this mathematical model

  8. Dynamic Power Management of Complex Systems Using Generalized Stochastic Petri Nets *

    E-Print Network [OSTI]

    Qiu, Qinru

    Dynamic Power Management of Complex Systems Using Generalized Stochastic Petri Nets * Qinru Qiu introduce a new technique for modeling and solving the dynamic power management (DPM) problem for systems model a power-managed distributed computing system as a controllable Generalized Stochastic Petri Net

  9. Dynamic Power Management of Complex Systems Using Generalized Stochastic Petri Nets*

    E-Print Network [OSTI]

    Pedram, Massoud

    Dynamic Power Management of Complex Systems Using Generalized Stochastic Petri Nets* Qinru Qiu introduce a new technique for modeling and solving the dynamic power management (DPM) problem for systems model a power-managed distributed computing system as a controllable Generalized Stochastic Petri Net

  10. Range Con: a management evaluation system for assessing sucess of selected range improvement practices

    E-Print Network [OSTI]

    Ekblad, Steven Linn

    1989-01-01T23:59:59.000Z

    strategic resource management plans. Individual management skills and managerial environment have not been considered when predicting biological and economic response of range management practices. Risk for individual managers adopting unsuited... APPENDIX Prototype Range Management Skills Survey. Range Management Skills Survey Survey Data Tables. Validation Figures. VITA 64 65 74 92 104 106 1X LIST OP FIGURES FIGURE Page 1. The Range Con expert system in relation to the Resource...

  11. Biology and management of insect pests in North American intensively managed hardwood forest systems.

    SciTech Connect (OSTI)

    Coyle, David R.; Nebeker, T., E.; Hart, E., R.; Mattson, W., J.

    2005-01-01T23:59:59.000Z

    Annu. Rev. Entomol. 50:1-29. Abstract Increasing demand for wood and wood products is putting stress on traditional forest production areas, leading to long-term economic and environmental concerns. Intensively managed hardwood forest systems (IMHFS), grown using conventional agricultural as well as forestry methods, can help alleviate potential problems in natural forest production areas. Although IMHFS can produce more biomass per hectare per year than natural forests, the ecologically simplified, monocultural systems may greatly increase the crops susceptibility to pests. Species in the genera Populus and Salix comprise the greatest acreage in IMHFS in North America, but other species, including Liquidambar styracifua and Platanus occidentalis, are also important. We discuss life histories, realized and potential damage, and management options for the most economically infuential pests that affect these hardwood species. The substantial inherent challenges associated with pest management in the monocultural environments created by IMHFS are reviewed. Finally, we discuss ways to design IMHFS that may reduce their susceptibility to pests, increase their growth and productivity potential, and create a more sustainable environment.

  12. LCA comparison of container systems in municipal solid waste management

    SciTech Connect (OSTI)

    Rives, Jesus, E-mail: Jesus.Rives@uab.ca [SosteniPrA (UAB-IRTA), Institute of Environmental Science and Technology (ICTA), Universitat Autonoma de Barcelona - UAB, 08193 Bellaterra, Barcelona (Spain); Rieradevall, Joan; Gabarrell, Xavier [SosteniPrA (UAB-IRTA), Institute of Environmental Science and Technology (ICTA), Universitat Autonoma de Barcelona - UAB, 08193 Bellaterra, Barcelona (Spain); Department of Chemical Engineering, Universitat Autonoma de Barcelona - UAB, 08193 Bellaterra, Barcelona (Spain)

    2010-06-15T23:59:59.000Z

    The planning and design of integrated municipal solid waste management (MSWM) systems requires accurate environmental impact evaluation of the systems and their components. This research assessed, quantified and compared the environmental impact of the first stage of the most used MSW container systems. The comparison was based on factors such as the volume of the containers, from small bins of 60-80 l to containers of 2400 l, and on the manufactured materials, steel and high-density polyethylene (HDPE). Also, some parameters such as frequency of collections, waste generation, filling percentage and waste container contents, were established to obtain comparable systems. The methodological framework of the analysis was the life cycle assessment (LCA), and the impact assessment method was based on CML 2 baseline 2000. Results indicated that, for the same volume, the collection systems that use HDPE waste containers had more of an impact than those using steel waste containers, in terms of abiotic depletion, global warming, ozone layer depletion, acidification, eutrophication, photochemical oxidation, human toxicity and terrestrial ecotoxicity. Besides, the collection systems using small HDPE bins (60 l or 80 l) had most impact while systems using big steel containers (2400 l) had less impact. Subsequent sensitivity analysis about the parameters established demonstrated that they could change the ultimate environmental impact of each waste container collection system, but that the comparative relationship between systems was similar.

  13. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    SciTech Connect (OSTI)

    Warner, B

    2002-04-25T23:59:59.000Z

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

  14. IMPLEMENTING AN ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEM A Case Study of Environmental Training and Awareness at the Vancouver

    E-Print Network [OSTI]

    IMPLEMENTING AN ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEM A Case Study of Environmental Training an ISO 14001 environmental management system: A case study of environmental training and awareness of limiting environmental damage. Environmental management systems (EMSs), such as ISO 14001, provide

  15. IWater Processing and Waste Management SystemsIntegrated System Health Management 2007 Phase II

    E-Print Network [OSTI]

    and other sources. It may serve as a backup processor for one or more existing water recovery systems unit drying prototype to for the recovery and recycle of water from concentrated waste water recovery system surfaces. The process is suitable for dewatering brine from the vapor compression distillation processor

  16. A Scenario-based Predictive Control Approach to Building HVAC Management Systems

    E-Print Network [OSTI]

    Johansson, Karl Henrik

    A Scenario-based Predictive Control Approach to Building HVAC Management Systems Alessandra Parisio and Air Conditioning (HVAC) systems while minimizing the overall energy use. The strategy uses

  17. Operation Diagnosis for Buildings Connecting Building Management Systems with Energy Management Systems 

    E-Print Network [OSTI]

    Mehler, G.

    2008-01-01T23:59:59.000Z

    8th International Conference for Enhanced Building Operations - ICEBO?08 Conference Center of the Federal Ministry of Economics and Technology Berlin, October 20 - 22, 2008 Dipl.-Ing. G?nther Mehler Johnson Controls Systems & Service Gmb...

  18. Feasibility Study for the K-Area Bingham Pump Outage Pit (643-1G)

    SciTech Connect (OSTI)

    Palmer, E.R. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-05-01T23:59:59.000Z

    The K-Area Bingham Pump Outage Pit (KBPOP) is one of four BPOP areas at Savannah River Site (SRS), collectively referred to as the BPOP waste unit group. This Feasibility Study (FS) of Remedial Alternatives serves as the lead FS for the BPOP waste unit group. This section identifies the purpose and scope of the FS and presents site background information summarized from the Final Remedial Investigation Report with Baseline Risk Assessment (RI/BRA) WSRC-RP- 95-1555, Rev. 1.2 (WSRC 1997).

  19. A Policy Management System for Hybrid Networks N Vardalachos, J Rubio, A Galis and J Serrat

    E-Print Network [OSTI]

    Haddadi, Hamed

    management architecture devised for management of IP over WDM networks and is part of the work carried outA Policy Management System for Hybrid Networks N Vardalachos, J Rubio, A Galis and J Serrat University College London, Universitat Politècnica de Catalunya Abstract: The management of heterogeneous

  20. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.4

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Downing, T.R. [and others] [and others

    1997-11-21T23:59:59.000Z

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links.

  1. System and method for acquisition management of subject position information

    DOE Patents [OSTI]

    Carrender, Curt

    2005-12-13T23:59:59.000Z

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  2. System and method for acquisition management of subject position information

    DOE Patents [OSTI]

    Carrender, Curt (Morgan Hill, CA)

    2007-01-23T23:59:59.000Z

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  3. Voices of Experience | Insights into Advanced Distribution Management Systems

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) of 2009 spurred investments in smart grid technology and programs at utilities across the country. In 2011, the Office of Electricity Delivery and Energy Reliability (OE), in partnership with electric utilities that received ARRA funds, convened a series of Regional Smart Grid Peer-to-Peer Workshops. These were designed to bring together utilities to engage in dialogues about the most compelling smart grid topics in each region. In February 2014, OE formed the Advanced Distribution Management Systems (ADMS) Working Group by assembling a leadership team of representatives from the utility industry with the mission to collect the experiences, insights, and lessons learned from implementing these systems. This Voices of Experience | Insights into Advanced Distribution Management Systems report is the result of a one-day meeting held at CenterPoint Energy in Houston, Texas, in May 2014 that was followed by a series of conference calls about specific aspects of ADMS, interviews with individuals leading ADMS projects at their utilities, and a final small group meeting at San Diego Gas & Electric in California in October 2014.

  4. Information System Security Manager (ISSM) | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked Questions for DOEthe RankingReformManager (ISSM) Information System Security

  5. Quantifying uncertainty in LCA-modelling of waste management systems

    SciTech Connect (OSTI)

    Clavreul, Julie, E-mail: julc@env.dtu.dk [Department of Environmental Engineering, Technical University of Denmark, Miljoevej, Building 113, DK-2800 Kongens Lyngby (Denmark); Guyonnet, Dominique [BRGM, ENAG BRGM-School, BP 6009, 3 Avenue C. Guillemin, 45060 Orleans Cedex (France); Christensen, Thomas H. [Department of Environmental Engineering, Technical University of Denmark, Miljoevej, Building 113, DK-2800 Kongens Lyngby (Denmark)

    2012-12-15T23:59:59.000Z

    Highlights: Black-Right-Pointing-Pointer Uncertainty in LCA-modelling of waste management is significant. Black-Right-Pointing-Pointer Model, scenario and parameter uncertainties contribute. Black-Right-Pointing-Pointer Sequential procedure for quantifying uncertainty is proposed. Black-Right-Pointing-Pointer Application of procedure is illustrated by a case-study. - Abstract: Uncertainty analysis in LCA studies has been subject to major progress over the last years. In the context of waste management, various methods have been implemented but a systematic method for uncertainty analysis of waste-LCA studies is lacking. The objective of this paper is (1) to present the sources of uncertainty specifically inherent to waste-LCA studies, (2) to select and apply several methods for uncertainty analysis and (3) to develop a general framework for quantitative uncertainty assessment of LCA of waste management systems. The suggested method is a sequence of four steps combining the selected methods: (Step 1) a sensitivity analysis evaluating the sensitivities of the results with respect to the input uncertainties, (Step 2) an uncertainty propagation providing appropriate tools for representing uncertainties and calculating the overall uncertainty of the model results, (Step 3) an uncertainty contribution analysis quantifying the contribution of each parameter uncertainty to the final uncertainty and (Step 4) as a new approach, a combined sensitivity analysis providing a visualisation of the shift in the ranking of different options due to variations of selected key parameters. This tiered approach optimises the resources available to LCA practitioners by only propagating the most influential uncertainties.

  6. Federal Emergency Management Information System (FEMIS) system administration guide, version 1.4.5

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Carter, R.J. [and others

    1998-06-26T23:59:59.000Z

    The Federal Emergency Management Information Systems (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication, data distribution, and notification functionality necessary to operate FEMIS in a networked, client/server environment. The UNIX server provides an Oracle relational database management system (RDBMS) services, ARC/INFO GIS (optional) capabilities, and basic file management services. PNNL developed utilities that reside on the server include the Notification Service, the Command Service that executes the evacuation model, and AutoRecovery. To operate FEMIS, the Application Software must have access to a site specific FEMIS emergency management database. Data that pertains to an individual EOC`s jurisdiction is stored on the EOC`s local server. Information that needs to be accessible to all EOCs is automatically distributed by the FEMIS database to the other EOCs at the site.

  7. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Frappaolo, C. [Delphi Consulting Group, Boston, MA (United States)

    1995-09-01T23:59:59.000Z

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  8. Naturalistic Decision Making For Power System Operators

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2009-06-23T23:59:59.000Z

    Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

  9. Evaluating Ocean Management Systems to Facilitate the Development of Ecosystem-Based Management

    E-Print Network [OSTI]

    Young, Oran R

    2009-01-01T23:59:59.000Z

    the Development of Ecosystem-Based Management Preparergovernance to assist ecosystem-based management initiativesCurrent Large Marine Ecosystem. This geographic scope

  10. Abstract--Health management systems have been gaining substantial attentions in power engineering areas in recent years

    E-Print Network [OSTI]

    Chow, Mo-Yuen

    Abstract--Health management systems have been gaining substantial attentions in power engineering of the proposed health management systems. Index Terms--health management systems, power distribution systems will be used to illustrate the features of the proposed health management systems for power engineering

  11. Environmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    , and health management into all work planning and execution. The purpose of BNL's ISMS is to ensure MANAGEMENT SYSTEM IDENTIFY AND ANALYZE HAZARDS ASSOCI- ATED WITH THE WORK: Hazards associated with the workEnvironmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  12. Environmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    management into all work planning and execution. The purpose of BNL's ISMS is to ensure that the way we do MANAGEMENT SYSTEM IDENTIFY AND ANALYZE HAZARDS ASSOCI- ATED WITH THE WORK: Hazards associated with the workEnvironmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  13. A Taxonomy and Survey of Grid Resource Management Systems Klaus Krauter1

    E-Print Network [OSTI]

    Buyya, Rajkumar

    1 A Taxonomy and Survey of Grid Resource Management Systems Klaus Krauter1 , Rajkumar Buyya2. In this paper, we develop a comprehensive taxonomy for describing resource management architectures. We use this taxonomy in identifying approaches followed in the implementation of real resource management systems

  14. Power Management over Co-channel Femtocells in LTE-A Systems

    E-Print Network [OSTI]

    Bouras, Christos

    Power Management over Co-channel Femtocells in LTE-A Systems Christos Bouras, Georgios Diles-A) macrocellular systems. The framework allows power management over user-defined femtocell deploy- ment, deciding. A major portion of the existing literature has investigated the interference and power management issues

  15. Dynamic Power Management in a Mobile Multimedia System with Guaranteed Quality-of-Service

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Dynamic Power Management in a Mobile Multimedia System with Guaranteed Quality-of-Service Abstract ­ In this paper we address the problem of dynamic power management in a distributed multimedia, we provide a detailed model of the power-managed multimedia system under general QoS constraints

  16. An Efficient Energy Management System for Android Phone Using Bayesian Networks

    E-Print Network [OSTI]

    Cho, Sung-Bae

    An Efficient Energy Management System for Android Phone Using Bayesian Networks Young-Seol Lee, proximity, light and orientation sensors for context-awareness. Energy-efficient battery management systems, it becomes an issue to develop the techniques for efficient energy management on a mobile phone [2, 3, 4

  17. Type Toyota Management Systems (MSTT) of small and medium-sized enterprises in mechanical and electrical

    E-Print Network [OSTI]

    Boyer, Edmond

    of a study, dealing with the topic of Type Toyota Management Systems. In the survey SMEs in mechanicalType Toyota Management Systems (MSTT) of small and medium-sized enterprises in mechanical; Institute of Industrial Manufacturing and Management (IFF), University of Stuttgart, Nobelstr. 12, D-70569

  18. Job Management System Extension To Support SLAAC-1V Reconfigurable Hardware Mohamed Taher1

    E-Print Network [OSTI]

    Gaj, Krzysztof

    Job Management System Extension To Support SLAAC-1V Reconfigurable Hardware Mohamed Taher1 , Kris of a lot of applications, but these resources are very expensive. Job management systems (JMS) are used in resource management and job scheduling. They allow users to execute jobs on a non-dedicated cluster

  19. PS2: Managing the next step in the Pan-STARRS wide field survey system

    E-Print Network [OSTI]

    Burgett, William S

    2012-01-01T23:59:59.000Z

    The Panoramic Survey Telescope and Rapid Response System (Pan-STARRS) is unique among the existing or planned major ground-based optical survey systems as the only "distributed aperture" system. The concept of increasing system \\'etendue by replicating small telescopes and digital cameras presents both management opportunities and challenges. The focus in this paper is on management lessons learned from PS1, and how those have been used to form the management plan for PS2. The management plan components emphasized here include technical development, financial and schedule planning, and critical path and risk management. Finally, the status and schedule for PS2 are presented.

  20. Spatial and Temporal Power Allocation for MISO Systems with Delayed Feedback

    E-Print Network [OSTI]

    Bhashyam, Srikrishna

    Spatial and Temporal Power Allocation for MISO Systems with Delayed Feedback Venkata Sreekanta@ee.iitm.ac.in Abstract-- We determine the minimum outage probabil- ity of multiple-input single-output (MISO) channels control. I. INTRODUCTION The minimum outage probability of multiple-input single-output (MISO) channels

  1. IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 2, MAY 2007 879 Power Engineering Letters

    E-Print Network [OSTI]

    Gross, George

    factors (LODFs), mul- tiple-line outages, power transfer distribution factors (PTDFs), system security. I attention. Given the usefulness of LODFs in the study of security with many outaged lines the convention that the direction of the real power flow on the line is from to . The ISF of line

  2. IEEE TRANSACTIONS ON POWER SYSTEMS (ACCEPTED) 1 Sparse Overcomplete Representations for

    E-Print Network [OSTI]

    Giannakis, Georgios

    Identification of Power Line Outages Hao Zhu, Student Member, IEEE, and Georgios B. Giannakis, Fellow, IEEE Abstract--Fast and accurate unveiling of power line outages is of paramount importance not only estimation, optimal power flow, real-time contingency analysis, and thus security assessment of power systems

  3. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States); Bailey, S. [Innovative Emergency Management, Inc., Baton Rouge, LA (United States); Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)

    1993-01-01T23:59:59.000Z

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

  4. Energy Management Strategy for Commercial Buildings Integrating PV and Storage Systems

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Energy Management Strategy for Commercial Buildings Integrating PV and Storage Systems He ZHANG1 by using the solution proposed. Keywords: Photovoltaic (PV) systems, fuzzy logic, storage system, energy connected to the power network and associated to photovoltaic and storage system. Some energy management

  5. Transportation functions of the Civilian Radioactive Waste Management System

    SciTech Connect (OSTI)

    Shappert, L.B. [ed.; Attaway, C.R.; Pope, R.B. [Oak Ridge National Lab., TN (United States); Best, R.E.; Danese, F.L. [Science Applications International Corp., Oak Ridge, TN (United States); Dixon, L.D. [Dixon (L.D.), Martinez, GA (United States); Jones, R.H. [Jones (R.H.), Los Gatos, CA (United States); Klimas, M.J. [USDOE Chicago Operations Office, Argonne, IL (United States); Peterson, R.W. [Bentz (E.J.) and Associates, Inc., Alexandria, VA (United States)

    1992-03-01T23:59:59.000Z

    Within the framework of Public Law 97.425 and provisions specified in the Code of Federal Regulations, Title 10 Part 961, the US Department of Energy has the responsibility to accept and transport spent fuel and high-level waste from various organizations which have entered into a contract with the federal government in a manner that protects the health and safety of the public and workers. In implementing these requirements, the Office of Civilian Radioactive Waste Management (OCRWM) has, among other things, supported the identification of functions that must be performed by a transportation system (TS) that will accept the waste for transport to a federal facility for storage and/or disposal. This document, through the application of system engineering principles, identifies the functions that must be performed to transport waste under this law.

  6. Network QoS Management in Cyber-Physical Systems

    E-Print Network [OSTI]

    Xia, Feng; Dong, Jinxiang; Sun, Youxian

    2008-01-01T23:59:59.000Z

    Technical advances in ubiquitous sensing, embedded computing, and wireless communication are leading to a new generation of engineered systems called cyber-physical systems (CPS). CPS promises to transform the way we interact with the physical world just as the Internet transformed how we interact with one another. Before this vision becomes a reality, however, a large number of challenges have to be addressed. Network quality of service (QoS) management in this new realm is among those issues that deserve extensive research efforts. It is envisioned that wireless sensor/actuator networks (WSANs) will play an essential role in CPS. This paper examines the main characteristics of WSANs and the requirements of QoS provisioning in the context of cyber-physical computing. Several research topics and challenges are identified. As a sample solution, a feedback scheduling framework is proposed to tackle some of the identified challenges. A simple example is also presented that illustrates the effectiveness of the pr...

  7. Multimedia-based Medicinal Plants Sustainability Management System

    E-Print Network [OSTI]

    Omogbadegun, Zacchaeus; Ayo, Charles; Mbarika, Victor; Omoregbe, Nicholas; Otofia, Efe; Chieze, Frank

    2011-01-01T23:59:59.000Z

    Medicinal plants are increasingly recognized worldwide as an alternative source of efficacious and inexpensive medications to synthetic chemo-therapeutic compound. Rapid declining wild stocks of medicinal plants accompanied by adulteration and species substitutions reduce their efficacy, quality and safety. Consequently, the low accessibility to and non-affordability of orthodox medicine costs by rural dwellers to be healthy and economically productive further threaten their life expectancy. Finding comprehensive information on medicinal plants of conservation concern at a global level has been difficult. This has created a gap between computing technologies' promises and expectations in the healing process under complementary and alternative medicine. This paper presents the design and implementation of a Multimedia-based Medicinal Plants Sustainability Management System addressing these concerns. Medicinal plants' details for designing the system were collected through semi-structured interviews and databas...

  8. Quality Management and Job Quality: How the ISO 9001 Standard forQuality Management Systems Affects Employees and Employers

    E-Print Network [OSTI]

    Levine, David I.; Toffel, Michael W.

    2008-01-01T23:59:59.000Z

    M.J. , F.M. Veloso. 2008. ISO 9000 practices and financialon global standards: A 15-economy survey of ISO 9000and ISO 14000. ISO Management Systems (Jan-Feb). http://

  9. ESD.36J / 1.432J System and Project Management, Fall 2003

    E-Print Network [OSTI]

    Lyneis, James

    The course is designed for students in the System Design and Management (SDM) program and therefore assumes that you already have a basic knowledge of project management. The objective is to introduce advanced methods and ...

  10. Development of Energy Consumption Database Management System of Existing Large Public Buildings 

    E-Print Network [OSTI]

    Li, Y.; Zhang, J.; Sun, D.

    2006-01-01T23:59:59.000Z

    The statistic data of energy consumption are the base of analyzing energy consumption. The scientific management method of energy consumption data and the development of database management system plays an important role in building energy...

  11. Development of Energy Consumption Database Management System of Existing Large Public Buildings

    E-Print Network [OSTI]

    Li, Y.; Zhang, J.; Sun, D.

    2006-01-01T23:59:59.000Z

    The statistic data of energy consumption are the base of analyzing energy consumption. The scientific management method of energy consumption data and the development of database management system plays an important role in building energy...

  12. A dynamic slack management technique for real-time distributed embedded systems

    E-Print Network [OSTI]

    Acharya, Subrata

    2006-04-12T23:59:59.000Z

    This work presents a novel slack management technique, the Service Rate Based Slack Distribution Technique, for dynamic real-time distributed embedded systems targeting the reduction and management of energy consumption. Energy minimization...

  13. 2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM

    E-Print Network [OSTI]

    Homes, Christopher C.

    the International Organization for Standardization ISO 14001 Standard, Environmental Management Systems conforms to the international standard on environmental management known as ISO 14001, with increased emphasis on compliance assurance, pollution prevention, and community outreach. Nine BNL organizations have

  14. Intern equivalency at the office of the program manager XM1 Tank systems: an internship report

    E-Print Network [OSTI]

    Root, Paul Michael, 1944-

    2013-03-13T23:59:59.000Z

    -academic environment in which he will become aware of his employer's approach to the solution of problems, especially those of a non-technical nature. The author served in the Automotive Branch of the Systems Engineering Division and was the Program Manager... career, the author had spent three and one half years in the Automotive Branch of the Systems Engineering Division, Office of the Program Manager, XM1 Tank Systems (now Ml Tank Systems). During that period he was responsible for managing...

  15. The Management of the Effects of a Hurricane: A Study of Higher Education Crisis Management Processes as Viewed through a Performance Management System

    E-Print Network [OSTI]

    Sutherland, Todd

    2013-07-26T23:59:59.000Z

    that went into the plan, the deployment of the plan, and the learning that took place throughout the crisis. In addition, the case study was considered through the use of a performance management system, specifically the Quality Texas Foundation...

  16. Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01T23:59:59.000Z

    To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

  17. Functional requirements for the Automated Transportation Management System: TTP number: RL 439002

    SciTech Connect (OSTI)

    Portsmouth, J.H. [Westinghouse Hanford Co., Richland, WA (United States)

    1992-12-31T23:59:59.000Z

    This requirements analysis, documents Department of Energy (DOE) transportation management procedures for the purpose of providing a clear and mutual understanding between users and designers of the proposed Automated Transportation Management System (ATMS). It is imperative that one understand precisely how DOE currently performs traffic management tasks; only then can an integrated system be proposed that successfully satisfies the major requirements of transportation managers and other system users. Accordingly, this report describes the current workings of DOE transportation organizations and then proposes a new system which represents a synthesis of procedures (both current and desired) which forms the basis for further systems development activities.

  18. Towards an Integration of the Lean Enterprise System, Total Quality Management, Six Sigma and Related Enterprise Process Improvement Methods

    E-Print Network [OSTI]

    Bozdogan, Kirkor

    2010-08-05T23:59:59.000Z

    The lean enterprise system, total quality management, six sigma, theory of constraints, agile manufacturing,

  19. An ANFIS Based Sensor Network for a Residential Energy Management System D. Senthilkumar, S. Kumar, Y. Ozturk and G. Lee

    E-Print Network [OSTI]

    Kumar, Sunil

    An ANFIS Based Sensor Network for a Residential Energy Management System D. Senthilkumar, S. Kumar management system project, an Integrated and Cognitive Home Energy Management System for Demand Response (DR management system which addresses demand response with efficient energy consumption. 1. Introduction State

  20. Business Process Modeling for developing Process Oriented IT Systems Track: Business Process Management Tools and Technologies

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Business Process Modeling for developing Process Oriented IT Systems Track: Business Process should be like. Therefore, business process modeling becomes a pre-requisite for system requirements, the paradigm of Business Process Management contrasts with traditional information system development, which

  1. Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-09-01T23:59:59.000Z

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

  2. Understanding the Benefits of Dispersed Grid-Connected Photovoltaics: From Avoiding the Next Major Outage to Taming Wholesale Power Markets

    SciTech Connect (OSTI)

    Letendre, Steven E.; Perez, Richard

    2006-07-15T23:59:59.000Z

    Thanks to new solar resource assessment techniques using cloud cover data available from geostationary satellites, it is apparent that grid-connected PV installations can serve to enhance electric grid reliability, preventing or hastening recovery from major power outages and serving to mitigate extreme price spikes in wholesale energy markets. (author)

  3. Management of a large distributed control system development project

    SciTech Connect (OSTI)

    Gurd, D. P. (David P.)

    2002-01-01T23:59:59.000Z

    Building an accelerator at six geographically dispersed sites is quite mad, but politically expedient. The Spallation Neutron Source (SNS), currently under construction in Oak Ridge, Tennessee, combines a pulsed 1 Gev H{sup -} superconducting linac with a compressor ring to deliver 2 MW of beam power to a liquid mercury target for neutron production [1]. Accelerator components, target and experimental (neutron-scattering) instruments are being developed collaboratively by Lawrence Berkeley (Ion Source and Front End), Los Alamos (Linac), Thomas Jefferson (Cryosystems), Brookhaven (Compressor Ring), Oak Ridge (Target and Conventional Facilities) and Argonne (Neutron Scattering Instruments) National Laboratories. Similarly, a team distributed among all of the participating laboratories is developing the EPICS-based control system. this paper discusses the management model and strategies being used to address the unusual issues of organization, communication, standardization, integration and hand-off inherent in this widely-distributed project.

  4. INTEGRATED SAFETY MANAGEMENT SYSTEM SAFETY CULTURE IMPROVEMENT INITIATIVE

    SciTech Connect (OSTI)

    MCDONALD JA JR

    2009-01-16T23:59:59.000Z

    In 2007, the Department of Energy (DOE) identified safety culture as one of their top Integrated Safety Management System (ISMS) related priorities. A team was formed to address this issue. The team identified a consensus set of safety culture principles, along with implementation practices that could be used by DOE, NNSA, and their contractors. Documented improvement tools were identified and communicated to contractors participating in a year long pilot project. After a year, lessons learned will be collected and a path forward determined. The goal of this effort was to achieve improved safety and mission performance through ISMS continuous improvement. The focus of ISMS improvement was safety culture improvement building on operating experience from similar industries such as the domestic and international commercial nuclear and chemical industry.

  5. CropIrri: A DECISION SUPPORT SYSTEM FOR CROP IRRIGATION MANAGEMENT

    E-Print Network [OSTI]

    CropIrri: A DECISION SUPPORT SYSTEM FOR CROP IRRIGATION MANAGEMENT Yi Zhang1 , Liping Feng1,* 1: A field crop irrigation management decision-making system (CropIrri) was developed based on the soil water of optimal irrigation methods and irrigation decision support system have obtained important achievements (J

  6. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.4.6

    SciTech Connect (OSTI)

    Arp, J.A.; Bower, J.C.; Burnett, R.A.; Carter, R.J.; Downing, T.R.; Fangman, P.M.; Gerhardstein, L.H.; Homer, B.J.; Johnson, D.M.; Johnson, R.L.; Johnson, S.M.; Loveall, R.M.; Martin, T.J.; Millard, W.D.; Schulze, S.A.; Stoops, L.R.; Tzemos, S.; Wood, B.M.

    1999-06-29T23:59:59.000Z

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

  7. Thermal management of long-length HTS cable systems

    SciTech Connect (OSTI)

    Demko, Jonathan A [ORNL; Hassenzahl, William V [ORNL

    2011-01-01T23:59:59.000Z

    Projections of electric power production suggest a major shift to renewables, such as wind and solar, which will be in remote locations where massive quantities of power are available. One solution for transmitting this power over long distances to load centers is direct current (dc), high temperature superconducting (HTS) cables. Electric transmission via dc cables promises to be effective because of the low-loss, highcurrent- carrying capability of HTS wire at cryogenic temperatures. However, the thermal management system for the cable must be carefully designed to achieve reliable and energyefficient operation. Here we extend the analysis of a superconducting dc cable concept proposed by the Electric Power Research Institute (EPRI), which has one stream of liquid nitrogen flowing in a cryogenic enclosure that includes the power cable, and a separate return tube for the nitrogen. Refrigeration stations positioned every 10 to 20 km cool both nitrogen streams. Both go and return lines are contained in a single vacuum/cryogenic envelope. Other coolants, including gaseous helium and gaseous hydrogen, could provide potential advantages, though they bring some technical challenges to the operation of long-length HTS dc cable systems. A discussion of the heat produced in superconducting cables and a system to remove the heat are discussed. Also, an analysis of the use of various cryogenic fluids in long-distance HTS power cables is presented.

  8. How to Successfully Implement a Knowledge Management System for the Mechanical Engineering Department at Gating Incorporated

    E-Print Network [OSTI]

    Mudd, John

    2009-05-15T23:59:59.000Z

    , utilizing some of the strategies, for the implementation of a Knowledge Management System for the Mechanical Engineering Department at Gating Incorporated....

  9. THE SCIENCE-POLICYINTERFACE:Using The Entire Scientific Toolbox To Enhance the Air Quality Management System

    E-Print Network [OSTI]

    Quality Management System The preceding chapters demonstrate the significant progress made during the last as an initial step to aid policy makers in designing and evaluating future management strategies. 5.1 THE AIR-QUALITY air-quality management processes, certain elements are common to each. These common elements

  10. Dynamic Power Management of Electronic Circuits and Systems Luca Benini GiovanniDe Micheli

    E-Print Network [OSTI]

    De Micheli, Giovanni

    Dynamic Power Management of Electronic Circuits and Systems Luca Benini GiovanniDe Micheli Stanford University Stanford,CA 94305 Abstract- Dynamic power management is a design methodology aiming at controlling approaches to power manage- ment, and we discuss issues related to the design of computer-aided design tools

  11. Task Merging for Dynamic Power Management of Cyclic Applications in Real-Time Multiprocessor Systems

    E-Print Network [OSTI]

    Qiu, Qinru

    Task Merging for Dynamic Power Management of Cyclic Applications in Real-Time Multiprocessor--In this paper we propose the method of task merging and idle period clustering for dynamic power management (DPM management, low power, multiprocessor, real-time I. INTRODUCTION Multiprocessor systems, which were used only

  12. Formal Analysis and Validation of Continuous-Time Markov Chain based System Level Power Management Strategies

    E-Print Network [OSTI]

    Oxford, University of

    Formal Analysis and Validation of Continuous-Time Markov Chain based System Level Power Management that competitive analysis based power management strategies can be automatically analyzed for proving competitive bounds and for validating power management strate- gies using the SMV model checker. In this paper, we

  13. An FPGA-based Distributed Computing System with Power and Thermal Management Capabilities

    E-Print Network [OSTI]

    Qiu, Qinru

    An FPGA-based Distributed Computing System with Power and Thermal Management Capabilities Hao Shen of New York Binghamton, NY, 13902, USA ABSTRACT Runtime power and thermal management has attracted step in the research of distributed power and thermal management. Compared to software simulation

  14. A Formal Framework for Modeling and Analysis of System-Level Dynamic Power Management

    E-Print Network [OSTI]

    Ha, Dong S.

    A Formal Framework for Modeling and Analysis of System-Level Dynamic Power Management Shrirang, tlmartin, ha}@vt.edu Abstract Recent advances in Dynamic Power Management (DPM) tech- niques have resulted in designs that support a rich set of power management options, both at the hardware and software levels

  15. Master Thesis KTH/ ICT / ECS -2007 -123 System-level power management design

    E-Print Network [OSTI]

    Jantsch, Axel

    i Master Thesis KTH/ ICT / ECS - 2007 - 123 System-level power management design on portable management (DPM) schemes (also called policies) can be used to control the power consumption levels consumption of a Philips multimedia device prototype, and introduced a dynamic power management solution

  16. Formal Analysis and Validation of ContinuousTime Markov Chain based System Level Power Management Strategies

    E-Print Network [OSTI]

    Oxford, University of

    Formal Analysis and Validation of Continuous­Time Markov Chain based System Level Power Management that competitive analysis based power management strategies can be automatically analyzed for proving competitive bounds and for validating power management strate­ gies using the SMV model checker. In this paper, we

  17. Belgirate, Italy, 28-30 September 2005 A COMPREHENSIVE THERMAL-AWARE POWER MANAGEMENT SYSTEM WITH

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Belgirate, Italy, 28-30 September 2005 A COMPREHENSIVE THERMAL-AWARE POWER MANAGEMENT SYSTEM power techniques due to shortage of battery life. Conventional power management designs focused. In this research, a block-level optimization of comprehensive thermal aware power management is presented

  18. Variation-Tolerant Dynamic Power Management at the System-Level

    E-Print Network [OSTI]

    California at San Diego, University of

    1 Variation-Tolerant Dynamic Power Management at the System-Level Saumya Chandra , Kanishka Lahiri the problem of designing effective power management schemes in the presence of such variations. In particular, we demonstrate that conventional power management schemes, which are designed without consider- ing

  19. Learning to Manage Combined Energy Supply Systems Azalia Mirhoseini, Farinaz Koushanfar

    E-Print Network [OSTI]

    energy management optimization for a hybrid set of EES elements (consisting of s-caps and a battery. We propose a novel energy management strategy for a combined (hybrid) supply consisting of a batteryLearning to Manage Combined Energy Supply Systems Azalia Mirhoseini, Farinaz Koushanfar Dept

  20. Stochastic Modeling and Optimization for Energy Management in Multi-Core Systems

    E-Print Network [OSTI]

    Tasiran, Serdar

    1 Stochastic Modeling and Optimization for Energy Management in Multi-Core Systems: A Video and optimization framework which leads to effective energy management policies. At the heart of this framework lie to obtain optimal energy management policies. These policies minimize the average energy consumption using

  1. Energy Efficiency: The New Holy Grail of Data Management Systems Research

    E-Print Network [OSTI]

    Energy Efficiency: The New Holy Grail of Data Management Systems Research Stavros Harizopoulos HP energy-friendly hardware. Despite the growing body of research in power management techniques, there has been little work to date on energy efficiency from a data management software per- spective

  2. An architecture of a workflow system for Integrated Asset Management in the smart oil field domain

    E-Print Network [OSTI]

    Prasanna, Viktor K.

    An architecture of a workflow system for Integrated Asset Management in the smart oil field domain Angeles, CA 90089 Email: {amol, prasanna}@usc.edu Abstract--Integrated Asset Management (IAM. The computational chal- lenges of oilfield management - especially reservoir simulation - have been the subject

  3. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    SciTech Connect (OSTI)

    CARTER, R.P.

    1999-11-19T23:59:59.000Z

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  4. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)] Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)] Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  5. Human-System Safety Methods for Development of Advanced Air Traffic Management Systems

    SciTech Connect (OSTI)

    Nelson, W.R.

    1999-05-24T23:59:59.000Z

    The Idaho National Engineering and Environmental Laboratory (INEEL) is supporting the National Aeronautics and Space Administration in the development of advanced air traffic management (ATM) systems as part of the Advanced Air Transportation Technologies program. As part of this program INEEL conducted a survey of human-system safety methods that have been applied to complex technical systems, to identify lessons learned from these applications and provide recommendations for the development of advanced ATM systems. The domains that were surveyed included offshore oil and gas, commercial nuclear power, commercial aviation, and military. The survey showed that widely different approaches are used in these industries, and that the methods used range from very high-level, qualitative approaches to very detailed quantitative methods such as human reliability analysis (HRA) and probabilistic safety assessment (PSA). In addition, the industries varied widely in how effectively they incorporate human-system safety assessment in the design, development, and testing of complex technical systems. In spite of the lack of uniformity in the approaches and methods used, it was found that methods are available that can be combined and adapted to support the development of advanced air traffic management systems.

  6. Proceedings: 2003 Workshop on Life Cycle Management Planning for Systems, Structures, and Components

    SciTech Connect (OSTI)

    None

    2003-12-01T23:59:59.000Z

    These proceedings of the 2003 EPRI Life Cycle Management Workshop provide nuclear plant owners with an overview of the state of development of methods and tools for performing long-term planning for maintenance, aging management, and obsolescence management of systems, structures, and components important to a plant's long-term safety, power production, and value in a market-driven industry. The proceedings summarize the results of applying life cycle management at several plants.

  7. Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu and Massoud Pedram

    E-Print Network [OSTI]

    Qiu, Qinru

    1 Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu, CA 90089 Abstract -- The goal of a dynamic power management policy is to reduce the power consumption of a power-managed electronic system. We formulate the problem of system-level power management

  8. Power System Extreme Event Detection: The VulnerabilityFrontier

    SciTech Connect (OSTI)

    Lesieutre, Bernard C.; Pinar, Ali; Roy, Sandip

    2007-10-17T23:59:59.000Z

    In this work we apply graph theoretic tools to provide aclose bound on a frontier relating the number of line outages in a gridto the power disrupted by the outages. This frontier describes theboundary of a space relating the possible severity of a disturbance interms of power disruption, from zero to some maximum on the boundary, tothe number line outages involved in the event. We present the usefulnessof this analysis with a complete analysis of a 30 bus system, and presentresults for larger systems.

  9. CS 525: Advanced Database Organization Study of relational, semantic, and object-oriented data models and interfaces. Database management system

    E-Print Network [OSTI]

    Heller, Barbara

    CS 525: Advanced Database Organization Objectives Study of relational, semantic, and object-oriented data models and interfaces. Database management system techniques for query optimization, concurrency History of database management. Goals of database system development. Relational systems Data models

  10. Selenium Speciation and Management in Wet FGD Systems

    SciTech Connect (OSTI)

    Searcy, K; Richardson, M; Blythe, G; Wallschlaeger, D; Chu, P; Dene, C

    2012-02-29T23:59:59.000Z

    This report discusses results from bench- and pilot-scale simulation tests conducted to determine the factors that impact selenium speciation and phase partitioning in wet FGD systems. The selenium chemistry in wet FGD systems is highly complex and not completely understood, thus extrapolation and scale-up of these results may be uncertain. Control of operating parameters and application of scrubber additives have successfully demonstrated the avoidance or decrease of selenite oxidation at the bench and pilot scale. Ongoing efforts to improve sample handling methods for selenium speciation measurements are also discussed. Bench-scale scrubber tests explored the impacts of oxidation air rate, trace metals, scrubber additives, and natural limestone on selenium speciation in synthetic and field-generated full-scale FGD liquors. The presence and concentration of redox-active chemical species as well as the oxidation air rate contribute to the oxidation-reduction potential (ORP) conditions in FGD scrubbers. Selenite oxidation to the undesirable selenate form increases with increasing ORP conditions, and decreases with decreasing ORP conditions. Solid-phase manganese [Mn(IV)] appeared to be the significant metal impacting the oxidation of selenite to selenate. Scrubber additives were tested for their ability to inhibit selenite oxidation. Although dibasic acid and other scrubber additives showed promise in early clear liquor (sodium based and without calcium solids) bench-scale tests, these additives did not show strong inhibition of selenite oxidation in tests with higher manganese concentrations and with slurries from full-scale wet FGD systems. In bench-tests with field liquors, addition of ferric chloride at a 250:1 iron-to-selenium mass ratio sorbed all incoming selenite to the solid phase, although addition of ferric salts had no impact on native selenate that already existed in the field slurry liquor sample. As ORP increases, selenite may oxidize to selenate more rapidly than it sorbs to ferric solids. Though it was not possible to demonstrate a decrease in selenium concentrations to levels below the project�¢����s target of 50 ���µg/L during pilot testing, some trends observed in bench-scale testing were evident at the pilot scale. Specifically, reducing oxidation air rate and ORP tends to either retain selenium as selenite in the liquor or shift selenium phase partitioning to the solid phase. Oxidation air flow rate control may be one option for managing selenium behavior in FGD scrubbers. Units that cycle load widely may find it more difficult to impact ORP conditions with oxidation air flow rate control alone. Because decreasing oxidation air rates to the reaction tank showed that all �¢����new�¢��� selenium reported to the solids, the addition of ferric chloride to the pilot scrubber could not show further improvements in selenium behavior. Ferric chloride addition did shift mercury to the slurry solids, specifically to the fine particles. Several competing pathways may govern the reporting of selenium to the slurry solids: co-precipitation with gypsum into the bulk solids and sorption or co-precipitation with iron into the fine particles. Simultaneous measurement of selenium and mercury behavior suggests a holistic management strategy is best to optimize the fate of both of these elements in FGD waters. Work conducted under this project evaluated sample handling and analytical methods for selenium speciation in FGD waters. Three analytical techniques and several preservation methods were employed. Measurements of selenium speciation over time indicated that for accurate selenium speciation, it is best to conduct measurements on unpreserved, filtered samples as soon after sampling as possible. The capital and operating costs for two selenium management strategies were considered: ferric chloride addition and oxidation air flow rate control. For ferric chloride addition, as migh

  11. System design and dynamic signature identification for intelligent energy management in residential buildings.

    E-Print Network [OSTI]

    Jang, Jaehwi

    2008-01-01T23:59:59.000Z

    Drewer and D. Gann, Smart buildings, Journal of Facilities ,smart energy management system specically for residential buildings.buildings is rooted in relative eectiveness per system by a smart

  12. Why Energy Audits Aren't Enough: An Energy Management System is Required 

    E-Print Network [OSTI]

    Haft, A. J.

    1980-01-01T23:59:59.000Z

    An evaluation of the energy systems in a plant can be accomplished by different techniques which require different levels of effort. Three alternatives are described: Rational Analysis, Energy Audits and Energy Management by Utility Systems Metering...

  13. Why Energy Audits Aren't Enough: An Energy Management System is Required

    E-Print Network [OSTI]

    Haft, A. J.

    1980-01-01T23:59:59.000Z

    An evaluation of the energy systems in a plant can be accomplished by different techniques which require different levels of effort. Three alternatives are described: Rational Analysis, Energy Audits and Energy Management by Utility Systems Metering...

  14. Multiobjective Search for the Management of a Hybrid Energy Storage System

    E-Print Network [OSTI]

    Paderborn, Universität

    Multiobjective Search for the Management of a Hybrid Energy Storage System Simon Boxnick, Stefan Kl objective search algorithm. The algorithm is designed for the management of a hybrid energy storage module-board hybrid energy storage system (HES) of the novel autonomous rail-bound vehicle RailCab developed

  15. EL Program: Smart Grid Program Manager: David Wollman, Smart Grid and Cyber-Physical Systems

    E-Print Network [OSTI]

    EL Program: Smart Grid Program Manager: David Wollman, Smart Grid and Cyber-Physical Systems Program Office, Associate Program Manager: Dean Prochaska, Smart Grid and Cyber- Physical Systems Program [updated August 23, 2013] Summary: This program develops and demonstrates smart grid measurement science

  16. RESOURCE MANAGEMENT IN COMPLEX SOCIO-TECHNICAL SYSTEMS: A MULTIAGENT COORDINATION FRAMEWORK

    E-Print Network [OSTI]

    Kropf, Peter

    (process con- trol, flexible manufacturing, and others), nuclear power plant control, communication management and control, shipboard command and control (C2), electric power management, reactive systems systems must assure adequate response to external threats while making the most effective use of its

  17. Minor in Agricultural Systems Management The Department of Biological and Agricultural Engineering

    E-Print Network [OSTI]

    Minor in Agricultural Systems Management Offered by The Department of Biological and Agricultural Engineering College of Agriculture and Life Sciences The minor in Agricultural Systems Management is available is to provide students, majoring in other fields, with a fundamental knowledge of the fields of agricultural

  18. A Flexible Image Retrieval and Multimedia Presentation Management System for Multimedia Databases

    E-Print Network [OSTI]

    Chen, Shu-Ching

    A Flexible Image Retrieval and Multimedia Presentation Management System for Multimedia Databases, multimedia data is becoming more and more common in daily applications, however this data is nearly useless. In this demonstration, we present a multimedia query and presentation management system for multimedia databases

  19. Power Management for Real-Time Embedded Systems on Block-Partitioned Multicore Platforms

    E-Print Network [OSTI]

    Zhu, Dakai

    Power Management for Real-Time Embedded Systems on Block-Partitioned Multicore Platforms Xuan Qi. For the mobile and portable devices, battery is one dominant constraint with fixed energy budget. For the high, it is imperative to develop power management schemes for systems on multicore platforms. However, applying

  20. Robust Optimal Control Strategies for a Hybrid Fuel Cell Power Management System

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Robust Optimal Control Strategies for a Hybrid Fuel Cell Power Management System David Hern strategies are proposed for the power management subsystem of a hybrid fuel cell/supercapacitor power generation system. The control strate- gies are based on different control configurations involving the power