Sample records for outage management system

  1. Shopping for outage management systems

    SciTech Connect (OSTI)

    Chou, Y.C.; Konneker, L.K.; Watkins, T.R.

    1995-12-31

    Customer service is becoming increasingly important to electric utilities. Outage management is an important part of customer service. Good outage management means quickly responding to outages and keeping customers informed about outages. Each outage equals lost customer satisfaction and lost revenue. Outage management is increasingly important because of new competition among utilities for customers, pressure from regulators, and internal pressure to cut costs. The market has several existing software products for outage management. How does a utility judge whether these products satisfy their specific needs? Technology is changing rapidly to support outage management. Which technology is proven and cost-effective? The purpose of this paper is to outline the procedure for evaluating outage management systems, and to discuss the key features to look for. It also gives our opinion of the features that represent state of the art. This paper will not discuss specific products or list vendors names.

  2. NERSC Scheduled System Outages

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled System Outages NERSC Scheduled System Outages Last edited: 2016-04-29 11:35:00

  3. Systems Outage Notification Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the need for a maintenance event window no less than 24 hours in advance of the outage (emergency fixes). Users will be notified of regularly scheduled maintenance in advance, on ...

  4. Managing turbine-generator outages by computer

    SciTech Connect (OSTI)

    Reinhart, E.R. [Reinhart and Associates, Inc., Austin, TX (United States)

    1997-09-01

    This article describes software being developed to address the need for computerized planning and documentation programs that can help manage outages. Downsized power-utility companies and the growing demand for independent, competitive engineering and maintenance services have created a need for a computer-assisted planning and technical-direction program for turbine-generator outages. To meet this need, a software tool is now under development that can run on a desktop or laptop personal computer to assist utility personnel and technical directors in outage planning. Total Outage Planning Software (TOPS), which runs on Windows, takes advantage of the mass data storage available with compact-disc technology by archiving the complete outage documentation on CD. Previous outage records can then be indexed, searched, and viewed on a computer with the click of a mouse. Critical-path schedules, parts lists, parts order tracking, work instructions and procedures, custom data sheets, and progress reports can be generated by computer on-site during an outage.

  5. Outage managment and health physics issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2008-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles include: Outage optimization initiatives, by George B. Beam, AREVA NP, Inc.; New plant based on excellent track records, by Jim Scarola, Progress Energy; Meeting customer needs and providing environmental benefits, by Peter S. Hastings, Duke Energy; Plants with 3-D design, by Jack A. Bailey, Tennessee Valley Authority; and Highest quality with exceptional planning, by Jason A. Walls, Duke Energy. Industry innovation articles include: Integrated exposure reduction plan, by Ed Wolfe, Exelon; Performance-based radiation worker training, by Joe Giuffre and Timothy Vriezerma, American Electric Power.

  6. Outage management and health physics issue, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2007-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: India: a potential commercial opportunity, a U.S. Department of Commerce Report, by Joe Neuhoff and Justin Rathke; The changing climate for nuclear energy, by Skip Bowman, Nuclear Energy Insitute; Selecting protective clothing, by J. Mark Price, Southern California Edison; and Succssful refurbishment outage, by Sudesh K. Gambhir, Omaha Public Power District. Industry innovation articles in this issue are: Containment radiation monitoring spiking, by Michael W. Lantz and Robert Routolo, Arizona Public Service Company; Improved outage performance, by Michael Powell and Troy Wilfong, Arizona Public Service Company, Palo Verde Nuclear Generating Station; Stop repacking valves and achieve leak-free performance, by Kenneth Hart, PPL Susquehanna LLC; and Head assembly upgrade package, by Timothy Petit, Dominion Nuclear.

  7. GUIDELINES FOR IMPLEMENTATION OF AN ADVANCED OUTAGE CONTROL CENTER TO IMPROVE OUTAGE COORDINATION, PROBLEM RESOLUTION, AND OUTAGE RISK MANAGEMENT

    SciTech Connect (OSTI)

    Germain, Shawn St; Farris, Ronald; Whaley, April M; Medema, Heather; Gertman, David

    2014-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Managing NPP outages is a complex and difficult task due to the large number of maintenance and repair activities that are accomplished in a short period of time. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information, and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status, and periodic briefings in the OCC. It is a difficult task to maintain current the information related to outage progress and discovered conditions. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across, and out of the OCC. The use of these technologies will allow information to be shared electronically, providing greater amounts of real-time information to the decision makers and allowing OCC coordinators to meet with supporting staff remotely. Passively monitoring status electronically through advances in the areas of mobile worker technologies, computer-based procedures, and automated work packages will reduce the current reliance on manually

  8. Outage management and health physics issue, 2006

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2006-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: A design with experience for the U.S., by Michael J. Wallace, Constellation Generation Group; Hope to be among the first, by Randy Hutchinson, Entergy Nuclear; Plans to file COLs in 2008, by Garry Miller, Progress Energy; Evolution of ICRP's recommendations, by Lars-Erik Holm, ICRP; European network on education and training in radiological protection, by Michele Coeck, SCK-CEN, Belgium; Outage managment: an important tool for improving nuclear power plant performance, by Thomas Mazour and Jiri Mandula, IAEA, Austria; and Plant profile: Exploring new paths to excellence, by Anne Thomas, Exelon Nuclear.

  9. Outage management and health physics issue, 2009

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles include the following: Planning and scheduling to minimize refueling outage, by Pat McKenna, AmerenUE; Prioritizing safety, quality and schedule, by Tom Sharkey, Dominion; Benchmarking to high standards, by Margie Jepson, Energy Nuclear; Benchmarking against U.S. standards, by Magnox North, United Kingdom; Enabling suppliers for new build activity, by Marcus Harrington, GE Hitachi Nuclear Energy; Identifying, cultivating and qualifying suppliers, by Thomas E. Silva, AREVA NP; Creating new U.S. jobs, by Francois Martineau, Areva NP. Industry innovation articles include: MSL Acoustic source load reduction, by Amir Shahkarami, Exelon Nuclear; Dual Methodology NDE of CRDM nozzles, by Michael Stark, Dominion Nuclear; and Electronic circuit board testing, by James Amundsen, FirstEnergy Nuclear Operating Company. The plant profile article is titled The future is now, by Julia Milstead, Progress Energy Service Company, LLC.

  10. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  11. Technology Integration Initiative In Support of Outage Management

    SciTech Connect (OSTI)

    Gregory Weatherby; David Gertman

    2012-07-01

    Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

  12. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    SciTech Connect (OSTI)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-09-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  13. U.S. - Canada Power System Outage Task Force: Final Report on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the ...

  14. Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

    SciTech Connect (OSTI)

    Shawn St. Germain; Ronald Farris; Heather Medeman

    2013-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near

  15. Outage Log

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status ... It is a historical record and may not be updated while a system event is in progress. ...

  16. Nuclear Safety Risk Management in Refueling Outage of Qinshan Nuclear Power Plant

    SciTech Connect (OSTI)

    Meijing Wu; Guozhang Shen

    2006-07-01

    The NPP is used to planning maintenance, in-service inspection, surveillance test, fuel handling and design modification in the refueling outage; the operator response capability will be reduced plus some of the plant systems out of service or loss of power at this time. Based on 8 times refueling outage experiences of the Qinshan NPP, this article provide some good practice and lesson learned for the nuclear safety risk management focus at four safety function areas of Residual Heat Removal Capability, Inventory Control, Power availability and Reactivity control. (authors)

  17. Overview of Common Mode Outages in Power Systems

    SciTech Connect (OSTI)

    Papic, Milorad; Awodele , Kehinde; Billinton, Roy; Dent, Chris; Eager, Dan; Hamoud, Gomaa; Jirutitijaroen, Panida; Kumbale, Murali; Mitra, Joydeep; Samaan, Nader A.; Schneider, Alex; Singh, Chanan

    2012-11-10

    This paper is a result of ongoing activity carried out by Probability Applications for Common Mode Events (PACME) Task Force under the Reliability Risk and Probability Applications (RRPA) Subcommittee. The paper is intended to constitute a valid source of information and references about dealing with common-mode outages in power systems reliability analysis. This effort involves reviewing published literature and presenting state-of-the-art research and practical applications in the area of common-mode outages. Evaluation of available outage statistics show that there is a definite need for collective effort from academia and industry to not only recommended procedures for data collection and monitoring but also to provide appropriate mathematical models to assess such events.

  18. A Study of Outage Management Practices at Selected U.S. Nuclear Plants

    SciTech Connect (OSTI)

    Lin, James C.

    2002-07-01

    This paper presents insights gained from a study of the outage management practices at a number of U.S. nuclear plants. The objective of the study was to conduct an in-depth review of the current practices of outage management at these selected plants and identify important factors that have contributed to the recent success of their outage performance. Two BWR-4, three BWR-6, and two 3-loop Westinghouse PWR plants were selected for this survey. The results of this study can be used to formulate outage improvement efforts for nuclear plants in other countries. (author)

  19. Use of collaboration software to improve nuclear power plant outage management

    SciTech Connect (OSTI)

    Germain, Shawn

    2015-02-01

    Nuclear Power Plant (NPP) refueling outages create some of the most challenging activities the utilities face in both tracking and coordinating thousands of activities in a short period of time. Other challenges, including nuclear safety concerns arising from atypical system configurations and resource allocation issues, can create delays and schedule overruns, driving up outage costs. Today the majority of the outage communication is done using processes that do not take advantage of advances in modern technologies that enable enhanced communication, collaboration and information sharing. Some of the common practices include: runners that deliver paper-based requests for approval, radios, telephones, desktop computers, daily schedule printouts, and static whiteboards that are used to display information. Many gains have been made to reduce the challenges facing outage coordinators; however; new opportunities can be realized by utilizing modern technological advancements in communication and information tools that can enhance the collective situational awareness of plant personnel leading to improved decision-making. Ongoing research as part of the Light Water Reactor Sustainability Program (LWRS) has been targeting NPP outage improvement. As part of this research, various applications of collaborative software have been demonstrated through pilot project utility partnerships. Collaboration software can be utilized as part of the larger concept of Computer-Supported Cooperative Work (CSCW). Collaborative software can be used for emergent issue resolution, Outage Control Center (OCC) displays, and schedule monitoring. Use of collaboration software enables outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on site or off.

  20. Improving Outage Performance: Outage Optimization Process

    SciTech Connect (OSTI)

    LaPlatney, Jere J.

    2006-07-01

    Planned outage performance is a key measure of how well an Nuclear Power Plant (NPP) is operated. Performance during planned outages strongly affects virtually all of a plant's performance metrics. In recognition of this fact, NPP operators worldwide have and continue to focus on improving their outage performance. The process of improving outage performance is commonly referred to as 'Outage Optimization' in the industry. This paper starts with a summary of the principles of Outage Optimization. It then provides an overview of a process in common use in the USA and elsewhere to manage the improvement of planned outages. The program described is comprehensive in that it involves managing improvement in both the Preparation and Execution phases of outage management. (author)

  1. Hoboken Hopes To Reduce Power Outages With New 'Smart Grid' System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... HOBOKEN, N.J. (CBSNewYork) - Officials are hoping to reduce power outages during future storms in Hoboken by designing a "smart grid" system using military-inspired technology. The ...

  2. U.S. - Canada Power System Outage Task Force: Final Report on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Task Force Recommendations | Department of Energy - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan,

  3. Evaluation of the marginal outage costs in interconnected and composite power systems

    SciTech Connect (OSTI)

    Ghajar, R.; Billinton, R.

    1995-05-01

    The structure of electric utilities is undergoing dramatic changes as new and expanded service options are added. The concepts of unbundling the electric service and offering customers a range of new services that more closely track actual costs are expanding the options open to customers. Spot pricing provides the economic structure for many of these new service options. An important component of spot prices is the marginal outage cost incurred by customers due to an incremental change in load. This paper presents a formalized approach of calculating the marginal outage cost in interconnected generating systems and composite generation and transmission systems using quantitative reliability techniques. The effects of selected pertinent factors on the marginal outage cost in composite systems are also presented. The proposed methods are illustrated by application to the IEEE-Reliability Test System (IEEE-RTS).

  4. Homeowners: Respond to Power Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines Homeowners: Respond to Power Outages Homeowners: Respond to Power Outages ... Learn more Certify your electrical systems-If your house sustains flood or wind damage ...

  5. Procedures and equipment for shortening refueling outages in Babcock and Wilcox PWRs. Final report

    SciTech Connect (OSTI)

    Baker, H.A.; Carr, C.W.

    1985-04-01

    New refueling equipment and procedures - plus a software package bid specification for outage management - can reduce refueling outages in Babcock and Wilcox PWRs. At Duke Power Company's Oconee nuclear station, a single modification in the fuel-handling system cut 5 days off the refueling schedule.

  6. North American Electric Reliability Council Outage Announcement...

    Broader source: Energy.gov (indexed) [DOE]

    Recommendations Blackout 2003: Blackout Final Implementation Report U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations

  7. Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

    SciTech Connect (OSTI)

    Germain, Shawn St.; Farris, Ronald

    2014-09-01

    Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally do not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.

  8. Outage project productivity improvement of TVA fossil

    SciTech Connect (OSTI)

    Picard, H.E.; Seay, C.R. Jr.

    1996-10-01

    Competition in the utility industry forces management to look closely at the cost effectiveness of power plant outage projects. At TVA Fossil and Hydro Power, innovative work measurement is proving effective as a project management tool to do more with less. Labor-hours to complete outage work scopes are reduced by some 20 to 30%, not by working harder or sacrificing safety, or quality, but by working and managing smarter. Fossil power plant outages and shutdowns are costly. They are labor-intensive construction projects, often with expanding work scope, and executed on a fast track. Outage work is inherently complex and dynamic, and often unpredictable. Many activities and tasks must be integrated, coordinated and completed safely and efficiently by multiple crafts and work groups. As a result, numerous productivity factors can influence the cost and schedule of outage completion. This provides owners, contractors and labor with unique opportunities for competitive advantage--by making radical changes in how they manage labor-hours and time.

  9. Application of Standard Maintenance Windows in PHWR Outage

    SciTech Connect (OSTI)

    Fuming Jiang

    2006-07-01

    The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

  10. Contingency Analysis of Cascading Line Outage Events

    SciTech Connect (OSTI)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  11. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    SciTech Connect (OSTI)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage

  12. How individual traces and interactive timelines could support outage execution - Toward an outage historian concept

    SciTech Connect (OSTI)

    Parfouru, S.; De-Beler, N.

    2012-07-01

    In the context of a project that is designing innovative ICT-based solutions for the organizational concept of outage management, we focus on the informational process of the OCR (Outage Control Room) underlying the execution of the outages. Informational process are based on structured and unstructured documents that have a key role in the collaborative processes and management of the outage. We especially track the structured and unstructured documents, electronically or not, from creation to sharing. Our analysis allows us to consider that the individual traces produced by an individual participant with a specific role could be multi-purpose and support sharing between participants without creating duplication of work. The ultimate goal is to be able to generate an outage historian, that is not just focused on highly structured information, which could be useful to improve the continuity of information between participants. We study the implementation of this approach through web technologies and social media tools to address this issue. We also investigate the issue of data access through interactive visualization timelines coupled with other modality's to assist users in the navigation and exploration of the proposed historian. (authors)

  13. Analysis of scrams and forced outages at boiling water reactors

    SciTech Connect (OSTI)

    Earle, R. T.; Sullivan, W. P.; Miller, K. R.; Schwegman, W. J.

    1980-07-01

    This report documents the results of a study of scrams and forced outages at General Electric Boiling Water Reactors (BWRs) operating in the United States. This study was conducted for Sandia Laboratories under a Light Water Reactor Safety Program which it manages for the United States Department of Energy. Operating plant data were used to identify the causes of scrams and forced outages. Causes of scrams and forced outages have been summarized as a function of operating plant and plant age and also ranked according to the number of events per year, outage time per year, and outage time per event. From this ranking, identified potential improvement opportunities were evaluated to determine the associated benefits and impact on plant availability.

  14. Track NERSC Outages in Google Calendar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outages in Google Calendar Track NERSC Outages in Google Calendar March 22, 2013 by Jack Deslippe Outages are now available in Google calendar form. You can subscribe to this...

  15. OutageMapURL Phases Energy Services

    Open Energy Info (EERE)

    OutageMapURL Phases Energy Services County Electric Power Assn http outages county org A N Electric Coop Virginia AEP Generating Company https www aepaccount com zipr...

  16. outages | OpenEI Community

    Open Energy Info (EERE)

    outages Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 29 October, 2012 - 14:46 East Coast Utilities prepare for Hurricane Sandy East Coast Hurricane...

  17. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its...

  18. Study, outlines why outages go long, short, or on-time

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    A recent report by a nuclear industry professional, based on a survey of outage managers at US nuclear power plants, declares that [open quotes]preplanned outage schedules appear to be grossly inaccurate, and the outage management planners and schedulers do not have a grasp of the requirements and/or the resources needed to complete the actual activities on schedule.[close quotes] It declares that [open quotes]the scheduled duration of a planned outage must be realistic.[close quotes] The study identifies personnel, planning and scheduling, and equipment/hardware as [open quotes]the primary reasons why refueling outages and outage activities finished ahead of, right on, or behind schedule.[close quotes

  19. August 14, 2003 Power Outages … Announcement

    Broader source: Energy.gov (indexed) [DOE]

    Ellen P. Vancko evancko@nerc.com Power Outage Update 8162003 11 a.m. EDT The bulk ... will continue to experience rotating outages due to generating capacity availability. ...

  20. Development of an Integrated Distribution Management System

    SciTech Connect (OSTI)

    Schatz, Joe E.

    2010-10-20

    This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

  1. RESOLVED: Projectb filesystem outage July 9, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    filesystem outage July 9, 2012 July 9, 2012 The projectb filesystem had a hardware failure that potentially generated IO errors. The filesystem logs indicate that the...

  2. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  3. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  4. Assessment of Critical Events Corridors through Multivariate Cascading Outages Analysis

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Samaan, Nader A.; Diao, Ruisheng; Kumbale, Murali; Chen, Yousu; Singh, Ruchi; Green, Irina; Morgan, Mark P.

    2011-10-17

    Massive blackouts of electrical power systems in North America over the past decade has focused increasing attention upon ways to identify and simulate network events that may potentially lead to widespread network collapse. This paper summarizes a method to simulate power-system vulnerability to cascading failures to a supplied set of initiating events synonymously termed as Extreme Events. The implemented simulation method is currently confined to simulating steady state power-system response to a set of extreme events. The outlined method of simulation is meant to augment and provide a new insight into bulk power transmission network planning that at present remains mainly confined to maintaining power system security for single and double component outages under a number of projected future network operating conditions. Although one of the aims of this paper is to demonstrate the feasibility of simulating network vulnerability to cascading outages, a more important goal has been to determine vulnerable parts of the network that may potentially be strengthened in practice so as to mitigate system susceptibility to cascading failures. This paper proposes to demonstrate a systematic approach to analyze extreme events and identify vulnerable system elements that may be contributing to cascading outages. The hypothesis of critical events corridors is proposed to represent repeating sequential outages that can occur in the system for multiple initiating events. The new concept helps to identify system reinforcements that planners could engineer in order to 'break' the critical events sequences and therefore lessen the likelihood of cascading outages. This hypothesis has been successfully validated with a California power system model.

  5. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    SciTech Connect (OSTI)

    Kosonen, M.; Hakola, M.

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  6. Property:OutagePhoneNumber | Open Energy Information

    Open Energy Info (EERE)

    OutagePhoneNumber Jump to: navigation, search Property Name OutagePhoneNumber Property Type String Description An outage hotline or 24-hour customer service number Note: uses...

  7. emergency management systems

    National Nuclear Security Administration (NNSA)

    9%2A en Building International Emergency Management Systems http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorisminternationalprograms-1

  8. System Management Software

    Energy Science and Technology Software Center (OSTI)

    2013-02-22

    MacPatch is Mac OS X system management software solution. It's used for patching, software distribution and inventory.

  9. Quantitative evaluation of savings in outage costs by using emergency actions strategy

    SciTech Connect (OSTI)

    Akhtar, A.; Asuhaimi, A.; Shaibon, H. [Univ. Teknologi Malaysia, Johor Bharu (Malaysia); Lo, K.L. [Univ. of Strathclyde, Glasgow (United Kingdom)

    1995-12-31

    This paper presents the results of a study carried out to assess the savings in consumer outage costs that can be accrued as a result of implementing Emergency Actions Strategy. The use of Emergency Actions Strategy plays a significant role in curtailing the consumer outage costs ensuing from unreliable electric service. In order to calculate the savings in outage costs, the probabilistic framework of the frequency and duration method has been used in conjunction with emergency actions. At first, the outage costs of various consumer sectors are estimated without considering the emergency actions. Secondly, the consumer outage costs are calculated by combining the frequency and duration method, and unserved energy with the emergency actions invoked. The results of the savings in consumer outage costs that can be accrued by utilizing Emergency Actions Strategy are presented for a synthetic system. The results of the study show that substantial savings in consumer outage costs are obtained by devising and implementing emergency actions strategy in situations of capacity outages. The results are of particular relevance and utility to the underdeveloped and developing countries where capacity shortages occur quite frequently. These results also suggest the importance of emergency actions strategy for electric utilities in reducing the consumer economic losses arising from unreliable electric service.

  10. Property:OutageMapURL | Open Energy Information

    Open Energy Info (EERE)

    + Agralite Electric Coop + https:pyxis-oms.comOutageMapAgraliteOutageMap.html + Alfalfa Electric Coop, Inc + https:ebill.alfalfaelectric.comwoViewermapviewer.html?config...

  11. A Review of Power Outages and Restoration Following the June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Review of Power Outages and Restoration Following the June 2012 Derecho A Review of Power Outages and Restoration Following the June 2012 Derecho This report reviews power ...

  12. North American Electric Reliability Council Power Outage Update...

    Office of Environmental Management (EM)

    will continue to experience rotating outages due to generating capacity availability. North American Electric Reliability Council Power Outage Update (48.2 KB) More Documents & ...

  13. Track NERSC Outages in Google Calendar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Track NERSC Outages in Google Calendar Track NERSC Outages in Google Calendar March 22, 2013 by Jack Deslippe Outages are now available in Google calendar form. You can subscribe to this calendar by following the link, http://goo.gl/A4n3k, and then clicking the add button on the bottom right. If you find any issues with the calendar content, please contact NERSC consultants by email at consult(at)nersc.gov. Subscribe via RSS Subscribe Browse by Date August 2016 June 2016 May 2016 April 2016

  14. Potomac River Project Outage Schedule Clarification | Department...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  15. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    SciTech Connect (OSTI)

    Shawn St. Germain; Kenneth Thomas; Ronald Farris; Jeffrey Joe

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  16. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-11-02

    The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Supersedes DOE O 151.1B.

  17. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous...

  18. Advanced Test Reactor outage risk assessment

    SciTech Connect (OSTI)

    Thatcher, T.A.; Atkinson, S.A.

    1997-12-31

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance.

  19. Item Management Control System

    Energy Science and Technology Software Center (OSTI)

    1993-08-06

    The Item Management Control System (IMCS) has been developed at Idaho National Engineering Laboratory to assist in organizing collections of documents using an IBM-PC or similar DOS system platform.

  20. Metadata management staging system

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    Django application providing a user-interface for building a file and metadata management system. An evolution of our Node.js and CouchDb metadata management system. This one focuses on server functionality and uses a well-documented, rational and REST-ful API for data access.

  1. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-01

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

  2. Lithium battery management system

    DOE Patents [OSTI]

    Dougherty, Thomas J.

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  3. RESOLVED: Projectb filesystem outage July 9, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RESOLVED: Projectb filesystem outage July 9, 2012 RESOLVED: Projectb filesystem outage July 9, 2012 July 9, 2012 The projectb filesystem had a hardware failure that potentially generated I/O errors. The filesystem logs indicate that the earliest abnormal event on the filesystem occurred at 9:19AM and the filesystem was taken down for maintenance at 10:42AM. The filesystem returned to service at 11:20AM. Jobs running on the cluster would not have been able to read from or write to the projectb

  4. Refinery Outages: First-Half 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    Outages: First-Half 2016 March 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Refinery Outages: First-Half 2016 i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States

  5. SAMPLE RESULTS FROM MCU SOLIDS OUTAGE

    SciTech Connect (OSTI)

    Peters, T.; Washington, A.; Oji, L.; Coleman, C.; Poirier, M.

    2014-09-22

    Savannah River National Laboratory (SRNL) has received several solid and liquid samples from MCU in an effort to understand and recover from the system outage starting on April 6, 2014. SRNL concludes that the presence of solids in the Salt Solution Feed Tank (SSFT) is the likely root cause for the outage, based upon the following discoveries ? A solids sample from the extraction contactor #1 proved to be mostly sodium oxalate ? A solids sample from the scrub contactor#1 proved to be mostly sodium oxalate ? A solids sample from the Salt Solution Feed Tank (SSFT) proved to be mostly sodium oxalate ? An archived sample from Tank 49H taken last year was shown to contain a fine precipitate of sodium oxalate ? A solids sample from the extraction contactor #1 drain pipe from extraction contactor#1 proved to be mostly sodium aluminosilicate ? A liquid sample from the SSFT was shown to have elevated levels of oxalate anion compared to the expected concentration in the feed Visual inspection of the SSFT indicated the presence of precipitated or transferred solids, which were likely also in the Salt Solution Receipt Tank (SSRT). The presence of the solids coupled with agitation performed to maintain feed temperature resulted in oxalate solids migration through the MCU system and caused hydraulic issues that resulted in unplanned phase carryover from the extraction into the scrub, and ultimately the strip contactors. Not only did this carryover result in the Strip Effluent (SE) being pushed out of waste acceptance specification, but it resulted in the deposition of solids into several of the contactors. At the same time, extensive deposits of aluminosilicates were found in the drain tube in the extraction contactor #1. However it is not known at this time how the aluminosilicate solids are related to the oxalate solids. The solids were successfully cleaned out of the MCU system. However, future consideration must be given to the exclusion of oxalate solids into the MCU system

  6. Survey of tools for risk assessment of cascading outages

    SciTech Connect (OSTI)

    Papic, Milorad; Bell, Keith; Chen, Yousu; Dobson, Ian; Fonte, Louis; Haq, Enamul; Hines, Paul; Kirschen, Daniel; Luo, Xiaochuan; Miller, Stephen; Samaan, Nader A.; Vaiman, Marianna; Varghese, Matthew; Zhang, Pei

    2011-10-01

    Abstract-This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers [1, 2] are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the second of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. The first paper reviews the state of the art in methodologies for performing risk assessment of potential cascading outages [3]. This paper describes the state of the art in cascading failure modeling tools, documenting the view of experts representing utilities, universities and consulting companies. The paper is intended to constitute a valid source of information and references about presently available tools that deal with prediction of cascading failure events. This effort involves reviewing published literature and other documentation from vendors, universities and research institutions. The assessment of cascading outages risk evaluation is in continuous evolution. Investigations to gain even better understanding and identification of cascading events are the subject of several research programs underway aimed at solving the complexity of these events that electrical utilities face today. Assessing the risk of cascading failure events in planning and operation for power transmission systems require adequate mathematical tools/software.

  7. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-08-11

    The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Supersedes DOE O 151.1C. Cancels DOE M 151.1-1.

  8. Oil field management system

    DOE Patents [OSTI]

    Fincke, James R.

    2003-09-23

    Oil field management systems and methods for managing operation of one or more wells producing a high void fraction multiphase flow. The system includes a differential pressure flow meter which samples pressure readings at various points of interest throughout the system and uses pressure differentials derived from the pressure readings to determine gas and liquid phase mass flow rates of the high void fraction multiphase flow. One or both of the gas and liquid phase mass flow rates are then compared with predetermined criteria. In the event such mass flow rates satisfy the predetermined criteria, a well control system implements a correlating adjustment action respecting the multiphase flow. In this way, various parameters regarding the high void fraction multiphase flow are used as control inputs to the well control system and thus facilitate management of well operations.

  9. Hopper compilers and DDT short outage next Wed, May 16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    compilers and DDT short outage next Wed, May 16 Hopper compilers and DDT short outage next Wed, May 16 May 10, 2012 Due to a scheduled maintenance for the License Servers, most of...

  10. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, Joao E.; Williams, Daniel W.

    1996-01-01

    A purge water management system for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  11. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, J.E.; Williams, D.W.

    1995-01-01

    A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  12. Computer memory management system

    DOE Patents [OSTI]

    Kirk, III, Whitson John

    2002-01-01

    A computer memory management system utilizing a memory structure system of "intelligent" pointers in which information related to the use status of the memory structure is designed into the pointer. Through this pointer system, The present invention provides essentially automatic memory management (often referred to as garbage collection) by allowing relationships between objects to have definite memory management behavior by use of coding protocol which describes when relationships should be maintained and when the relationships should be broken. In one aspect, the present invention system allows automatic breaking of strong links to facilitate object garbage collection, coupled with relationship adjectives which define deletion of associated objects. In another aspect, The present invention includes simple-to-use infinite undo/redo functionality in that it has the capability, through a simple function call, to undo all of the changes made to a data model since the previous `valid state` was noted.

  13. Pinpointing the cause of an outage for something as complex and interconnected as the high voltage transmission system is a ve

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ellen P. Vancko evancko@nerc.com Electric System Update: Sunday August 17, 2003, 5:00 p.m. The electric transmission system is now operating reliably. All electric power transmission lines that were removed from service during the blackout on August 14, 2003, have been returned to service with one exception. The lines between Michigan and Ontario remain out of service due to operational security reasons; however, they are expected to be returned to service later this evening. Most of the

  14. Management control system description

    SciTech Connect (OSTI)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  15. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-08-21

    The Order establishes policy and assigns and describes roles and responsibilities for the DOE Emergency Management System. Cancels DOE 5500.1B, DOE 5500.2B, DOE 5500.3A, DOE 5500.4A, 5500.5A,5500.7B, 5500.8A, 5500.9A, DOE 5500.10

  16. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-29

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. (This is an administrative change to DOE O 151.1A). Canceled by DOE O 151.1C. Cancels DOE O 151.1A.

  17. Design Concepts for an Outage Control Center Information Dashboard

    SciTech Connect (OSTI)

    Hugo, Jacques Victor; St Germain, Shawn Walter; Thompson, Cheradan Jo; Whitesides, McKenzie Jo; Farris, Ronald Keith

    2015-12-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  18. Analytical Services Management System

    Energy Science and Technology Software Center (OSTI)

    2005-03-30

    Analytical Services Management System (ASMS) provides sample management services. Sample management includes sample planning for analytical requests, sample tracking for shipping and receiving by the laboratory, receipt of the analytical data deliverable, processing the deliverable and payment of the laboratory conducting the analyses. ASMS is a web based application that provides the ability to manage these activities at multiple locations for different customers. ASMS provides for the assignment of single to multiple samples for standardmore » chemical and radiochemical analyses. ASMS is a flexible system which allows the users to request analyses by line item code. Line item codes are selected based on the Basic Ordering Agreement (BOA) format for contracting with participating laboratories. ASMS also allows contracting with non-BOA laboratories using a similar line item code contracting format for their services. ASMS allows sample and analysis tracking from sample planning and collection in the field through sample shipment, laboratory sample receipt, laboratory analysis and submittal of the requested analyses, electronic data transfer, and payment of the laboratories for the completed analyses. The software when in operation contains business sensitive material that is used as a principal portion of the Kaiser Analytical Management Services business model. The software version provided is the most recent version, however the copy of the application does not contain business sensitive data from the associated Oracle tables such as contract information or price per line item code.« less

  19. Analytical Services Management System

    SciTech Connect (OSTI)

    Church, Shane; Nigbor, Mike; Hillman, Daniel

    2005-03-30

    Analytical Services Management System (ASMS) provides sample management services. Sample management includes sample planning for analytical requests, sample tracking for shipping and receiving by the laboratory, receipt of the analytical data deliverable, processing the deliverable and payment of the laboratory conducting the analyses. ASMS is a web based application that provides the ability to manage these activities at multiple locations for different customers. ASMS provides for the assignment of single to multiple samples for standard chemical and radiochemical analyses. ASMS is a flexible system which allows the users to request analyses by line item code. Line item codes are selected based on the Basic Ordering Agreement (BOA) format for contracting with participating laboratories. ASMS also allows contracting with non-BOA laboratories using a similar line item code contracting format for their services. ASMS allows sample and analysis tracking from sample planning and collection in the field through sample shipment, laboratory sample receipt, laboratory analysis and submittal of the requested analyses, electronic data transfer, and payment of the laboratories for the completed analyses. The software when in operation contains business sensitive material that is used as a principal portion of the Kaiser Analytical Management Services business model. The software version provided is the most recent version, however the copy of the application does not contain business sensitive data from the associated Oracle tables such as contract information or price per line item code.

  20. Power management system

    DOE Patents [OSTI]

    Algrain, Marcelo C.; Johnson, Kris W.; Akasam, Sivaprasad; Hoff, Brian D.

    2007-10-02

    A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

  1. Chemical Management System

    Energy Science and Technology Software Center (OSTI)

    1998-10-30

    CMS provides an inventory of all chemicals on order or being held in the laboratory, to provide a specific location for all chemical containers, to ensure that health and safety regulatory codes are being upheld, and to provide PNNL staff with hazardous chemical information to better manage their inventories. CMS is comprised of five major modules: 1) chemical purchasing, 2) chemical inventory, 3) chemical names, properties, and hazard groups, 4) reporting, and 5) system administration.

  2. Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-25

    The order establishes policy, and assigns and describes roles and responsibilities for the DOE Emergency Management System. DOE 5500.1B Chg 1; DOE 5500.2B Chg 1; DOE 5500.3A Chg 1; DOE 5500.4A; DOE 5500.5A; DOE 5500.7B; DOE 5500.8A; DOE 5500.9A, and DOE 5500.10A Chg 1. Canceled by DOE O 151.1A.

  3. Outlook for Refinery Outages and Available Refinery Capacity...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of gasoline and distillate, and to include a more detailed consideration of the impact of unexpected outages on product supplies. This report reviews the potential...

  4. Homeowners: Respond to Power Outages | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Power Outages After a disaster, electric utilities and government officials will first work to restore power to critical infrastructure like power plants and transmission lines, ...

  5. A Review of Power Outages and Restoration Following the June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy ...

  6. Outlook for Refinery Outages and Available Refinery Capacity...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    level of refinery outages outlined in this report. This report does not consider the impacts of refined product logistics and distribution, which could affect the movement of...

  7. Safety Management System Policy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable ...

  8. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  9. Cryptographic Key Management System

    SciTech Connect (OSTI)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  10. Computerized training management system

    DOE Patents [OSTI]

    Rice, Harold B.; McNair, Robert C.; White, Kenneth; Maugeri, Terry

    1998-08-04

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  11. Computerized training management system

    DOE Patents [OSTI]

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  12. Project Management Information Systems (PMIS) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Assessment & Reporting System (PARS IIe) Office of Project Management Oversight...

  13. Fermi 2: Independent safety assessment of refueling outage

    SciTech Connect (OSTI)

    Arora, H.O. [Detroit Edison, MI (United States)

    1994-12-31

    Industry experience and studies conducted by the U.S. Nuclear Regulatory Commission (NRC) have shown that plants are susceptible to a variety of events that can challenge safety during shutdowns. While these events have neither posed nor indicated an undue risk to public health and safety, they do serve to underscore the importance of effective outage planning and control. The NUMARC 91-06 guidelines suggest that proper planning and execution of outage activities can reduce the likelihood and consequences of events, which ultimately enhances safety during shutdown. The Fermi 2, Independent Safety Engineering Group (ISEG) is charged with the independent safety review of the refueling outage plan and its implementation. The ISEG is responsible for performing a detailed and critical review of proposed outage plan prior to the start of the outage, maintaining surveillance of the adequacy and consistency of the {open_quotes}defense-in-depth{close_quotes} provided during the outage, reviewing the outage plan changes for potential vulnerabilities that could affect safety functions, and investigating selected events that emerge during the course of the outage.

  14. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-05-06

    The Guide supports the Departments initiatives to improve program, project, and contract management through the implementation and surveillance of contractors earned value management systems. Canceled by DOE G 413.3-10A.

  15. A stochastic model for the measurement of electricity outage costs

    SciTech Connect (OSTI)

    Grosfeld-Nir, A.; Tishler, A. (Tel Aviv Univ. (Israel))

    1993-01-01

    The measurement of customer outage costs has recently become an important subject of research for electric utilities. This paper uses a stochastic dynamic model as the starting point in developing a market-based method for the evaluation of outage costs. Specifically, the model postulates that once an electricity outage occurs, all production activity stops. Full production is resumed once the electricity outage is over. This process repeats itself indefinitely. The business customer maximizes his expected discounted profits (the expected value of the firm), taking into account his limited ability to respond to repeated random electricity outages. The model is applied to 11 industrial branches in Israel. The estimates exhibit a large variation across branches. 34 refs., 3 tabs.

  16. Integrated Management Tracking System

    Energy Science and Technology Software Center (OSTI)

    2000-03-30

    The Integrated Management Tracking System (IMTS) is a "Web Enabled" Client/Server Business application that provides for the Identification and Resolution of commitments, situations, events and problems. The IMTS engine is written with Microsoft Active Server Pages (ASP) for IIS4. The system provides for reporting, entering, editing, closing and administration over a Intranet, Extranet or Internet. This Application facilitates: Electronic assignment, acceptance and tracking to completion. Email notifications of assigned action. Establishment of Due Dates. Electronicmore » search and retrieval based on keywords in combination with user specified database parameters (Document Type, Date Ranges, etc.). Coded for Trending and Reporting. User selected reports. Various levels of access for reports and administration. The "Server" side of this application consists of a Microsoft Access database running on a NT Server with Internet Information Server (IIS). As the "Client" side of the application runs on any Web browser, this solution is a cost effective, user friendly application that lends itself to organizations not physically colocated in one location providing information immediately available to everyone at once.« less

  17. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13

    To support DOE's initiatives to improve program, project, and contract management through the implementation and surveillance of a contractor's Earned Value Management System (EVMS) that is in conformance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the American National Standards Institute/Electronic Industries Alliance (ANSI/EIA)-748-B, Earned Value Management System (or as required by contract), and Federal Acquisition Regulation (FAR) 52.234-4, Earned Value Management System (EVMS). Admin Chg 1 dated 10-22-2015.

  18. PNNL: About - Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EMS Graphic The purpose of the Environmental Management System is to achieve and demonstrate environmental excellence by assessing and controlling the impact of Laboratory...

  19. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13

    This Guide provides approaches for implementing the Earned Value Management System (EVMS) requirements of DOE O 413.3B. Supersedes DOE G 413.3-10.

  20. EARNED VALUE MANAGEMENT SYSTEM

    Broader source: Energy.gov (indexed) [DOE]

    ... the costs associated with the authorized resources identified to accomplish the work and invalidates management's forecasting of future resource requirements and their costs. ...

  1. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  2. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Seeley, Charles Erklin; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Utturkar, Yogen Vishwas; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2015-08-25

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  3. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Seeley, Charles Erklin; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Utturkar, Yogen Vishwas; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2015-02-24

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  4. Application of Hybrid Geo-Spatially Granular Fragility Curves to Improve Power Outage Predictions

    SciTech Connect (OSTI)

    Fernandez, Steven J; Allen, Melissa R; Omitaomu, Olufemi A; Walker, Kimberly A

    2014-01-01

    Fragility curves depict the relationship between a weather variable (wind speed, gust speed, ice accumulation, precipitation rate) and the observed outages for a targeted infrastructure network. This paper describes an empirical study of the county by county distribution of power outages and one minute weather variables during Hurricane Irene with the objective of comparing 1) as built fragility curves (statistical approach) to engineering as designed (bottom up) fragility curves for skill in forecasting outages during future hurricanes; 2) county specific fragility curves to find examples of significant deviation from average behavior; and 3) the engineering practices of outlier counties to suggest future engineering studies of robustness. Outages in more than 90% of the impacted counties could be anticipated through an average or generic fragility curve. The remaining counties could be identified and handled as exceptions through geographic data sets. The counties with increased or decreased robustness were characterized by terrain more or less susceptible to persistent flooding in areas where above ground poles located their foundations. Land use characteristics of the area served by the power distribution system can suggest trends in the as built power grid vulnerabilities to extreme weather events that would be subjects for site specific studies.

  5. Fuel cell gas management system

    DOE Patents [OSTI]

    DuBose, Ronald Arthur

    2000-01-11

    A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

  6. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  7. Preparing for a Power Outage | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of September, FEMA's website Ready.gov will focus on a different emergency scenario and share tips on how to be prepared in case of floods, wildfires, hurricanes or power outages. ...

  8. Integrated Safety Management System Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-11-01

    This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

  9. Device configuration-management system

    SciTech Connect (OSTI)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information.

  10. Safety Management System Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management » Safety » Safety Management System Policy Safety Management System Policy Safety Management Systems provide a formal, organized process whereby people plan, perform, assess, and improve the safe conduct of work. The Safety Management System is institutionalized through Department of Energy (DOE) directives and contracts to establish the Department-wide safety management objective, guiding principles, and functions. The DOE safety management system consists of six

  11. XCPU2 process management system

    SciTech Connect (OSTI)

    Ionkov, Latchesar; Van Hensbergen, Eric

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  12. Facilities Information Management System (FIMS) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities Information Management System (FIMS) Facilities Information Management System (FIMS) FIMS is DOE's corporate database for real property as required by DOE Order 430.1B, ...

  13. Heating System Modernization, Management of Peripheral Scope...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA, Dec 2010 Heating System Modernization, Management of Peripheral Scope Lessons Learned Report,...

  14. Civilian Radioactive Waste Management System Requirements Document...

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level ...

  15. Managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.M.; Murphy, M.D.

    1995-07-01

    A methodology for risk management in the design of software systems is presented. It spans security, safety, and correct operation of software within the context of its environment, and produces a risk analysis and documented risk management strategy. It is designed to be iteratively applied, to attain appropriate levels of detail throughout the analysis. The methodology and supporting tools are discussed. The methodology is critiqued relative to other research in the field. Some sample applications of the methodology are presented.

  16. System for Award Management (SAM):

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today because you want to: a) Get a contract with the federal government b) Get a grant from the federal government c) Increase the work you are already doing with the federal government d) Learn new acronyms WHERE DO YOU START? www.sam.gov WHAT IS SAM? The System for Award Management (SAM) is the Official U.S. Government

  17. Joint Environmental Management System (EMS) Declaration of Conformance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of ...

  18. Hopper compilers and DDT short outage next Wed, May 16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    compilers and DDT short outage next Wed, May 16 Hopper compilers and DDT short outage next Wed, May 16 May 10, 2012 Due to a scheduled maintenance for the License Servers, most of the compilers (except GNU) and the DDT debugger on Hopper will not be available from 10:30 am to 12:30 pm on Wednesday, May 16. If there are any questions or concerns, please contact "consult at nersc dot gov". Subscribe via RSS Subscribe Browse by Date February 2013 September 2012 August 2012 May 2012 April

  19. Thermal management systems and methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2006-12-12

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  20. Battery Thermal Management System Design Modeling (Presentation)

    SciTech Connect (OSTI)

    Kim, G-H.; Pesaran, A.

    2006-10-01

    Presents the objectives and motivations for a battery thermal management vehicle system design study.

  1. Information system revives materials management

    SciTech Connect (OSTI)

    Hansen, T.

    1995-12-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD).

  2. COKEMASTER: Coke plant management system

    SciTech Connect (OSTI)

    Johanning, J.; Reinke, M.

    1996-12-31

    To keep coke utilization in ironmaking as competitive as possible, the potential to improve the economics of coke production has to be utilized. As one measure to meet this need of its customers, Krupp Koppers has expanded its existing ECOTROL computer system for battery heating control to a comprehensive Coke Plant Management System. Increased capacity utilization, lower energy consumption, stabilization of plant operation and ease of operation are the main targets.

  3. Calpine Power Management LLC | Open Energy Information

    Open Energy Info (EERE)

    (Redirected from Calpine Power Management) Jump to: navigation, search Name: Calpine Power Management LLC Place: Texas Phone Number: 713.830.2000 Website: www.calpine.com Outage...

  4. Metrics for border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  5. ORISE: Performance Improvement Management System (PIMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Improvement Management System (PIMS) PIMS web-based application aids Veterans Health Administration (VHA) Emergency Management in response to local emergencies and...

  6. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To ... The next planned outage on 23106 high voltage circuit between xxxxxxx xx xxxx and ...

  7. PIA - Human Resources Management Information System (HRMIS) ...

    Broader source: Energy.gov (indexed) [DOE]

    Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) (490.32 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - ...

  8. A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys

    SciTech Connect (OSTI)

    Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

    2003-11-01

    A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1,200 for small

  9. Integrated Building Management System (IBMS)

    SciTech Connect (OSTI)

    Anita Lewis

    2012-07-01

    This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

  10. Appropriate Technology Management Information System

    SciTech Connect (OSTI)

    Not Available

    1984-02-01

    From 1978 to 1981, the Department of Energy (DOE) awarded more than 2200 small grants worth more than $25 million to individuals, organizations and small businesses across the nation for the purposes of researching, developing and demonstrating appropriate technologies. Grants were given in the full range of technology areas, including conservation, solar, biomass, wind, geothermal, and hydro power. The final report from each DOE grantee was reviewed in an effort to extract information about new ideas and proven concepts that could be of value to the public. To manage the growing wealth of information from the grant reports, and to monitor the report review process, the Appropriate Technology Management Information System (ATMIS), a computer data base, was developed. The ATMIS can classify data into numerous categories (technology area, geographic location, project status, etc.). This manual was generated directly from the data base.

  11. Energy.gov Content Management System

    Broader source: Energy.gov [DOE]

    Energy.gov Content Management SystemEERE's websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office.

  12. Energy Management for Motor-Driven Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY Energy Management for Motor Driven Systems The energy savings network-plug into it Energy Management for Motor-Driven Systems Prepared by Gilbert A. McCoy and John G. ...

  13. Integrated Vehicle Thermal Management Systems (VTMS) Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Integrated Vehicle Thermal Management Power Electronic Thermal System Performance and Integration Characterization and Development of Advanced...

  14. emergency management systems | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    systems NNSA sites prepared for disasters using real-time response management system Pantex Emergency Services now uses the Emergency Management Information System, or EMInS. From left: Maribel Martinez, Brenda Graham and Greg Roddahl. One of NNSA's missions is emergency response, so it only makes sense that our sites and labs excel at emergency management on the local level. When... Building International Emergency Management Systems NNSA helps nations develop the core elements of an emergency

  15. Environmental Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Systems Environmental Management Systems DOE uses Environmental Management Systems already in place at DOE facilities as a management framework to determine and achieve sustainability goals and targets. The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, directs agencies to continue implementation of formal EMS where those systems have

  16. Risk Assessment of Cascading Outages: Methodologies and Challenges

    SciTech Connect (OSTI)

    Vaiman, Marianna; Bell, Keith; Chen, Yousu; Chowdhury, Badrul; Dobson, Ian; Hines, Paul; Papic, Milorad; Miller, Stephen; Zhang, Pei

    2012-05-31

    Abstract- This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses different approaches to this and suggests directions for future development of methodologies. The second paper summarizes the state of the art in modeling tools for risk assessment of cascading outages.

  17. Building International Emergency Management Systems | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Building International Emergency Management Systems NNSA helps nations develop the core elements of an emergency response program. Based on preliminary discussions with counterparts, NNSA develops emergency management programs with partner nations to exchange views and enhance development of effective emergency management systems. Generally, NNSA will assist foreign governments and international organizations with integration of emergency-program core

  18. Single System Image Cluster Management

    Energy Science and Technology Software Center (OSTI)

    2004-02-13

    Cluster computing has quickly proven itself to be a capable workhorse for a wide variety of production computing tasks; however, setting up and maintaining a cluster still requires significantly more effort than administrating just a single machine. As computing hardware descreases in price and cluster sizes grow, it is becoming increasingly important to manage clusters cleverly so that a system administration effort can "scale" as well. To ease the task of mananging many machines, administratorsmore » often deploy an environment that is homogeneous across all nodes of a cluster, and maintain a snapshot of the filesystem as a 'master image'. However due to operational, behavioral, and physical constraints, many nodes often require numerous deviations from the master image in order to operate as desired.« less

  19. SES Performance Management System Policy and Operating Procedures

    Broader source: Energy.gov [DOE]

    The SES Performance Management System Policy and Operating Procedures are designed to provide the framework for DOE’s performance management system. This performance management system applies to...

  20. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ...

  1. Tank waste remediation system configuration management plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  2. Assessing waste management systems using reginalt software

    SciTech Connect (OSTI)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs.

  3. A model for international border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  4. Earned Value Management System (EVMS) - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0A, Earned Value Management System (EVMS) by Rick Blaisdell Functional areas: Capital Assets, Contract Management, Program Management, Project Management This Guide provides...

  5. SRNS Environmental Management System External Audit | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon SRNS Environmental Management System External Audit More Documents & Publications ARRA Interfaces with the 2009 SRNS ISMS Phase 2 Verification SRNS-PROCUREMENT-CYCLE-SYSTE...

  6. UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: ...

  7. Building Management System Integrators | Open Energy Information

    Open Energy Info (EERE)

    Place: Berkshire, England, United Kingdom Zip: SL1 5AU Product: Service and maintenance provider. References: Building Management System Integrators1 This article is a...

  8. Nuclear Materials Management & Safeguards System | National Nuclear...

    National Nuclear Security Administration (NNSA)

    About Our Programs Nuclear Security Nuclear Materials Management & Safeguards System NMMSS U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials ...

  9. Implementing a Corporate Energy Management System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System (June 3, 2010) (2.58 MB) Presentation slides and accompanying audio (43.51 MB) More Documents & Publications Build Replication ...

  10. Bechtel Environmental Integrated Database Management System

    Energy Science and Technology Software Center (OSTI)

    1995-04-11

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  11. Home Energy Management System - Stochastic Optimal Scheduling...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Return to Search Home Energy Management System - Stochastic Optimal Scheduling of Residential Appliances with Renewable Energy Sources National Renewable Energy Laboratory Contact ...

  12. Energy.gov Content Management System Webforms

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, Energy.gov's content management system (CMS) has the ability to create webforms.

  13. Energy Management Systems: Maximizing Energy Savings

    Broader source: Energy.gov [DOE]

    This webinar covered how to optimize installations of new energy management systems, review EMS strategies following lighting/HVAC retrofit projects, and utilize excess EECBG funding.

  14. Risk Assessment of Cascading Outages: Part I - Overview of Methodologies

    SciTech Connect (OSTI)

    Vaiman, Marianna; Bell, Keith; Chen, Yousu; Chowdhury, Badrul; Dobson, Ian; Hines, Paul; Papic, Milorad; Miller, Stephen; Zhang, Pei

    2011-07-31

    This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which will extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses diffeent approaches to this and suggests directions for future development of methodologies.

  15. Further Notice of 230kV Circuit Planned Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages

  16. Status of U.S. Nuclear Outages - U.S. Energy Information Administratio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    < NUCLEAR & URANIUM Data Status of U.S. Nuclear Outages Download Download Link to: Nuclear Regulatory Commission's Power Reactor Status Report

  17. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-20

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  18. Foundational Report Series. Advanced Distribution management Systems for Grid Modernization (Importance of DMS for Distribution Grid Modernization)

    SciTech Connect (OSTI)

    Wang, Jianhui

    2015-09-01

    Grid modernization is transforming the operation and management of electric distribution systems from manual, paper-driven business processes to electronic, computer-assisted decisionmaking. At the center of this business transformation is the distribution management system (DMS), which provides a foundation from which optimal levels of performance can be achieved in an increasingly complex business and operating environment. Electric distribution utilities are facing many new challenges that are dramatically increasing the complexity of operating and managing the electric distribution system: growing customer expectations for service reliability and power quality, pressure to achieve better efficiency and utilization of existing distribution system assets, and reduction of greenhouse gas emissions by accommodating high penetration levels of distributed generating resources powered by renewable energy sources (wind, solar, etc.). Recent “storm of the century” events in the northeastern United States and the lengthy power outages and customer hardships that followed have greatly elevated the need to make power delivery systems more resilient to major storm events and to provide a more effective electric utility response during such regional power grid emergencies. Despite these newly emerging challenges for electric distribution system operators, only a small percentage of electric utilities have actually implemented a DMS. This paper discusses reasons why a DMS is needed and why the DMS may emerge as a mission-critical system that will soon be considered essential as electric utilities roll out their grid modernization strategies.

  19. Comment and Response Management System

    Energy Science and Technology Software Center (OSTI)

    1998-06-09

    CRMS is a Web-based client/server application that helps manage, track, and report on institutional responses to public comments on published documents such as environmental impact statements.

  20. Earned Value Management System RM

    Broader source: Energy.gov [DOE]

    In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital...

  1. Underground and Ventilation System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UPDATE ON RECENT EVENTS Joe Franco, CBFO Manager 3 Overview of Week's Activities * Power outage * Recovery strategy * Safety first * Planned and prioritized * Phased approach 4 ...

  2. A Review of Power Outages and Restoration Following the June 2012 Derecho

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability has released a report that reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the Ohio Valley and Mid-Atlantic regions.

  3. PIA - Foreign Travel Management System (FTMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) (389.71 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  4. Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-29

    The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Supersedes DOE G 450.4-1B and DOE G 450.3-3.

  5. Integrated safety management system verification: Volume 1

    SciTech Connect (OSTI)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  6. Planning for an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

  7. Methods of forming thermal management systems and thermal management methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2012-06-05

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  8. Auto-Versioning Systems Image Manager

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    The av_sys_image_mgr utility provides an interface for the creation, manipulation, and analysis of system boot images for computer systems. It is primarily intended to provide a convenient method for managing the introduction of changes to boot images for long-lived production HPC systems.

  9. Tank waste remediation system risk management list

    SciTech Connect (OSTI)

    Collard, L.B.

    1995-10-31

    The Tank Waste Remedation System (TWRS) Risk Management List and it`s subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists.

  10. Smart Grid Week: Hurricane Season and the Department’s Efforts to Make the Grid More Resilient to Power Outages

    Broader source: Energy.gov [DOE]

    Next up in our Smart Grid Week series -- improving electric grid technologies to adequately prepare for emergencies with power outages.

  11. Smart distribution systems

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jiang, Yazhou; Liu, Chen -Ching; Xu, Yin

    2016-04-19

    The increasing importance of system reliability and resilience is changing the way distribution systems are planned and operated. To achieve a distribution system self-healing against power outages, emerging technologies and devices, such as remote-controlled switches (RCSs) and smart meters, are being deployed. The higher level of automation is transforming traditional distribution systems into the smart distribution systems (SDSs) of the future. The availability of data and remote control capability in SDSs provides distribution operators with an opportunity to optimize system operation and control. In this paper, the development of SDSs and resulting benefits of enhanced system capabilities are discussed. Amore » comprehensive survey is conducted on the state-of-the-art applications of RCSs and smart meters in SDSs. Specifically, a new method, called Temporal Causal Diagram (TCD), is used to incorporate outage notifications from smart meters for enhanced outage management. To fully utilize the fast operation of RCSs, the spanning tree search algorithm is used to develop service restoration strategies. Optimal placement of RCSs and the resulting enhancement of system reliability are discussed. Distribution system resilience with respect to extreme events is presented. Furthermore, test cases are used to demonstrate the benefit of SDSs. Active management of distributed generators (DGs) is introduced. Future research in a smart distribution environment is proposed.« less

  12. System for Award Management (SAM):

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (ORCA) * Excluded Parties List System (EPLS) WHAT DO I NEED TO DO? Create User ... Check email. Confirm Email. And.... NOW WHAT DO I DO? Login & Accept License Agreement Had ...

  13. Criteria for evaluating open energy management systems

    SciTech Connect (OSTI)

    Podmore, R. )

    1993-05-01

    Open Energy Management Systems can address utility needs more quickly, at lower cost while providing protection of investments and flexibility for the future. With open systems utilities will tend to incrementally upgrade rather than completely replace their EMS systems. This paper addresses: What is an open EMS What changes in electric utility industry are affecting control center design How can existing systems be upgraded to an open architecture What factors are important to open EMS designs

  14. Joint Environmental Management System (EMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The

  15. Tank waste remediation system systems engineering management plan

    SciTech Connect (OSTI)

    Peck, L.G.

    1996-02-06

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

  16. Introduction to an Energy Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction to an Energy Management System Introduction to an Energy Management System This presentation provides an overview to energy management system (EnMS) implementation describing what an EnMS is and why an EnMS is useful. Introduction to an Energy Management System (April 19, 2012) (2.1 MB) More Documents & Publications The Do and Check Processes of an Energy Management System Planning for an Energy Management System Becoming a Certified Practitioner or a Certified Energy Engine

  17. Notice of Unplanned Outage at the Mirant Potomac River Plant | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Unplanned Outage at the Mirant Potomac River Plant Notice of Unplanned Outage at the Mirant Potomac River Plant Docket No. EO-05-01. Order No. 202-05-03: Pursuant to the United States Department of Energy ("DOE") Order No_ 202-05-3, issued December 20, 2005 ("DOE Potomac River Order"), Pepco hereby files this notice of an unplanned outage of one of the 230kV circuits serving the Potomac River Substation, and through that station, the District of Columbia. Notice

  18. Notification of Planned 230kV Outage at Potomac River Generating Station |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will begin at 4:00 AM with a scheduled return date of Saturday, June 9, 2007 at 2:00 PM. Notification of Planned 230kV Outage at Potomac River Generating Station (34.76 KB) More Documents & Publications Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned

  19. V-125: Cisco Connected Grid Network Management System Multiple...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am...

  20. South Asia Energy Management Systems Inc SAEMS | Open Energy...

    Open Energy Info (EERE)

    Energy Management Systems Inc SAEMS Jump to: navigation, search Name: South Asia Energy Management Systems, Inc. (SAEMS) Place: California Product: South Asia Energy is...

  1. Practical Ocean Energy Management Systems Inc POEMS | Open Energy...

    Open Energy Info (EERE)

    Ocean Energy Management Systems Inc POEMS Jump to: navigation, search Name: Practical Ocean Energy Management Systems Inc (POEMS) Place: San Diego, California Zip: 92138 Sector:...

  2. Concept for Management of the Future Electricity System (Smart...

    Open Energy Info (EERE)

    Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System...

  3. Guidance for FY2014 Facilities Information Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations FY 2014 FIMS Data Validation Guidance ...

  4. Energy.gov Data Tables in Content Management System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Tables in Content Management System Energy.gov Data Tables in Content Management System For Office of Energy Efficiency and Renewable Energy (EERE) websites, follow these...

  5. Implementing a Corporate Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System" Steve Schultz Corporate Energy Manager 3M Presented at the U.S. Department of Energy Industrial Technologies Program June 3, 2010 Webcast 3M - Solving Problems Everywhere  Operate companies in more than 65 countries  35 international companies with manufacturing operations, 35 with laboratories  In the United States, operations in 28 states  R&D and related expenditures total $6.861 billion for the last five years  More

  6. Vol 2, Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-05-27

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1B.

  7. Tank waste remediation system systems engineering management plan

    SciTech Connect (OSTI)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

  8. Notification of Planned 230kV Outage at Potomac River Generating Station

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. The next planned outage on xxxxx high voltage circuit between xxxxx and xxxxx is tentatively scheduled for Saturday May 19, 2007 and will begin at 4:00 AM with a scheduled...

  9. Notification of Planned 230kV Outage at Potomac River Generating...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  10. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. ...

  11. Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01.  Pepco needs the following to occur to provide necessary reliability to the central D.C. area during this scheduled June outage in order to complete installation of new...

  12. Systems approach to project risk management

    SciTech Connect (OSTI)

    Kindinger, J. P.

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  13. INFORMATION ON THE SYSTEM FOR AWARD MANAGEMENT (SAM)

    Broader source: Energy.gov (indexed) [DOE]

    THE SYSTEM FOR AWARD MANAGEMENT (SAM) Eight federal procurement systems and the Catalog of Federal Domestic Assistance will be combined into one new system, the System for Award...

  14. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    SciTech Connect (OSTI)

    Mankamo, T.; Kim, I.S.; Samanta, P.K.

    1992-12-31

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested.

  15. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    SciTech Connect (OSTI)

    Mankamo, T. ); Kim, I.S.; Samanta, P.K. )

    1992-01-01

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested.

  16. Recommendation 171: Commendation for Waste Information Management System

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ORSSAB commends DOE and Florida International University for development of the Waste Information Management System.

  17. Improving Mission Execution by Integrating our Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-03

    Request for analysis and preliminary set of alternatives for the integration of management systems within DOE.

  18. Battery management system with distributed wireless sensors

    DOE Patents [OSTI]

    Farmer, Joseph C.; Bandhauer, Todd M.

    2016-02-23

    A system for monitoring parameters of an energy storage system having a multiplicity of individual energy storage cells. A radio frequency identification and sensor unit is connected to each of the individual energy storage cells. The radio frequency identification and sensor unit operates to sense the parameter of each individual energy storage cell and provides radio frequency transmission of the parameters of each individual energy storage cell. A management system monitors the radio frequency transmissions from the radio frequency identification and sensor units for monitoring the parameters of the energy storage system.

  19. Data management system for organic soil

    SciTech Connect (OSTI)

    Stinnette, P.

    1999-07-01

    A Data Management System for Organic Soil (DMSOS) has been developed that enables the acquisition, management and analysis of organic soil data as well as the presentation of results to be conducted effectively through a common interface. This development was in response to the data management needs of research investigating the engineering properties of organic soil and its extension to the stabilization of organic soil through dynamic replacement (DR). It is shown how the above functions are implemented efficiently using Windows-based software to perform comprehensive data management and analysis of data gathered from both laboratory and field tests. When the engineering properties of a given organic soil deposit are needed, a build-in Computer Advisor for Organic Soil Projects (CAOSP) predicts the properties from DMSOS based correlations. A unique and useful feature of the CAOSP is its ability to estimate the anticipated ultimate settlement of an organic soil deposit given the loading conditions and the moisture or organic content. Also incorporated in the DMSOS is a quality control system that utilizes computerized data acquisition/data management techniques in order to evaluate the degree of improvement of an organic soil layer at a given stage of treatment using DR.

  20. Environmental remediation and waste management information systems

    SciTech Connect (OSTI)

    Harrington, M.W.; Harlan, C.P.

    1993-12-31

    The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

  1. Optimal management of batteries in electric systems

    DOE Patents [OSTI]

    Atcitty, Stanley; Butler, Paul C.; Corey, Garth P.; Symons, Philip C.

    2002-01-01

    An electric system including at least a pair of battery strings and an AC source minimizes the use and maximizes the efficiency of the AC source by using the AC source only to charge all battery strings at the same time. Then one or more battery strings is used to power the load while management, such as application of a finish charge, is provided to one battery string. After another charge cycle, the roles of the battery strings are reversed so that each battery string receives regular management.

  2. Pre-Validated Signal Database Management System

    Energy Science and Technology Software Center (OSTI)

    1996-12-18

    SPRT/DBMS is a pre-validated experimental database management system for industries where large volumes of process signals are acquired and archived. This system implements a new and powerful pattern recognition method, the spectrum transformed sequential testing (STST or ST2) procedure. A network of interacting ST2 modules deployed in parallel is integrated with a relational DBMS to fully validate process signals as they are archived. This reliable, secure DBMS then provides system modelers, code developers, and safetymore » analysts with an easily accessible source of fully validated process data.« less

  3. Managing Design and Construction Using Systems Engineering for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A by Roland Frenck Functional areas: Construction and Engineering, Program Management This...

  4. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-27

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  5. OTRA-THS MAC to reduce Power Outage Data Collection Latency in a smart meter network

    SciTech Connect (OSTI)

    Garlapati, Shravan K; Kuruganti, Phani Teja; Buehrer, Richard M; Reed, Jeffrey H

    2014-01-01

    The deployment of advanced metering infrastructure by the electric utilities poses unique communication challenges, particularly as the number of meters per aggregator increases. During a power outage, a smart meter tries to report it instantaneously to the electric utility. In a densely populated residential/industrial locality, it is possible that a large number of smart meters simultaneously try to get access to the communication network to report the power outage. If the number of smart meters is very high of the order of tens of thousands (metropolitan areas), the power outage data flooding can lead to Random Access CHannel (RACH) congestion. Several utilities are considering the use of cellular network for smart meter communications. In 3G/4G cellular networks, RACH congestion not only leads to collisions, retransmissions and increased RACH delays, but also has the potential to disrupt the dedicated traffic flow by increasing the interference levels (3G CDMA). In order to overcome this problem, in this paper we propose a Time Hierarchical Scheme (THS) that reduces the intensity of power outage data flooding and power outage reporting delay by 6/7th, and 17/18th when compared to their respective values without THS. Also, we propose an Optimum Transmission Rate Adaptive (OTRA) MAC to optimize the latency in power outage data collection. The analysis and simulation results presented in this paper show that both the OTRA and THS features of the proposed MAC results in a Power Outage Data Collection Latency (PODCL) that is 1/10th of the 4G LTE PODCL.

  6. Contractor Earned Value Management System Certification Status | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Contractor Earned Value Management System Certification Status Contractor Earned Value Management System Certification Status Certification Status for major EM Contracts Contractor Earned Value Management System Certification Status (129.04 KB) More Documents & Publications Department of Energy Earned Value Management Survey Results VPP Participant Status EM Major Contracts Awarded Since 2006

  7. DOCS System Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering project, can be used as a template to facilitate the creation of the CMP for your particular project. DOCS System Configuration Management Plan (654.98 KB) More Documents & Publications OPC Security Whitepaper #3Hardening Guidelines for OPC Hosts NMMSS Software Quality Assurance Plan ABB SCADA/EMS System INEEL

  8. Electronic Document Management System PIA, BechtelJacobs Company, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC (239.76 KB) More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC

  9. New Eddy Correlation Systems Installed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preliminary results were very promising, indicating that the new system could operate flawlessly and could withstand power outages. Subsequently, four systems have been installed ...

  10. Best Management Practice #8: Steam Boiler Systems | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Steam Boiler Systems Best Management Practice 8: Steam Boiler Systems Steam boilers are commonly used in large heating systems, institutional kitchens, or in facilities where ...

  11. PIA - Human Resources Management System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    System PIA - Human Resources Management System (218.23 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information ...

  12. Nuclear Materials Management and Safeguards System (NMMSS)

    SciTech Connect (OSTI)

    Jacobsen, S.E.; Matthews, W.B. III; McKamy, E.D.; Pedigo, R.B. )

    1991-01-01

    This paper describes the Nuclear Materials Management and Safeguards System (NMMSS) which is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The system serves national security and program management interests, and international interests in the programs for the peaceful application of nuclear energy and non-proliferation of nuclear weapons. Within the scope of the NMMSS are found all nuclear materials applied and controlled under United States law and related international agreements, including U.S. nuclear materials production programs and U.S. private nuclear industrial activities. In addition, its national and international scope enables it to provide services to other organizations such as the Arms Control and Disarmament Agency, the Department of State, and the U.S. Congress.

  13. UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: Project Title: Associated Materials: Programmatic RIS Previous Project Number(s) Status Code Allotment Code (S=Supplier, U=User) I authorize that the information listed above is for the NMMSS Program to use as part of the project number conversion process for this facility. Signature of Authorized Official Date

  14. System and method for advanced power management

    DOE Patents [OSTI]

    Atcitty, Stanley; Symons, Philip C.; Butler, Paul C.; Corey, Garth P.

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  15. Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System

    SciTech Connect (OSTI)

    Stoupis, James; Mousavi, Mirrasoul

    2014-09-30

    New data collection system equipment was installed in Xcel Energy substations and data was collected from 6 substations and 20 feeders. During Phase I, ABB collected and analyzed 793 real-time events to date from 6 Xcel Energy substations and continues today. The development and integration of several applications was completed during the course of this project, including a model-based faulted segment identification algorithm, with very positive results validated with field-gathered data discussed and included in this report. For mostly underground feeders, the success rate is 90% and the overreach rate is 90%. For mostly overhead feeders, the success rate is 74% and the overreach rate is 50%. The developed method is producing very accurate results for mostly underground feeders. For mostly overhead feeders, due to the bad OMS data quality and varying fault resistance when arcing, the developed method is producing good results but with much room for improvement. One area where the algorithm can be improved is the accuracy for sub-cycle fault events. In these cases, the accuracy of the conventional signal processing methods suffers due to most of these methods being based on a one-cycle processing window. By improving the signal processing accuracy, the accuracy of the faulted segment identification algorithm will also improve significantly. ABB intends to devote research in this area in the near future to help solve this problem. Other new applications developed during the course of the project include volt/VAR monitoring, unbalanced capacitor switching detection, unbalanced feeder loading detection, and feeder overloading detection. An important aspect of the demonstration phase of the project is to show the ability to provide adequate “heads-up” time ahead of customer calls or AMI reports so that the operators are provided with the much needed time to collect information needed to address an outage. The advance notification feature of the demonstration system

  16. Information System Security Manager (ISSM) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manager (ISSM) Information System Security Manager (ISSM) macbook-925595_960_720.jpg The Information Security System Manager (ISSM) is designated by an operating unit's (DOE organization or site) Senior Manager to manage the unit's cyber security program. The ISSM establishes, documents, and monitors an operating unit's cyber security program implementation plan, and ensures compliance with DOE management policies. Candidates must possess a working knowledge of cyber security policies and

  17. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-01-01

    unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

  18. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE (299.08 KB) More Documents & Publications PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory PIA - INL PeopleSoft - Human Resource System

  19. Environmental management system objectives & targets results summary :

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2014-04-01

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  20. V-174: RSA Authentication Manager Writes Operating System, SNMP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files V-174: RSA Authentication Manager Writes Operating System,...

  1. Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is

  2. Civilian Radioactive Waste Management System Requirements Document

    SciTech Connect (OSTI)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  3. V-132: IBM Tivoli System Automation Application Manager Multiple

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vulnerabilities | Department of Energy 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security

  4. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  5. Understanding and managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.; Lim, J.; Murphy, M.; Wyss, G.

    1995-07-01

    When software is used in safety-critical, security-critical, or mission-critical situations, it is imperative to understand and manage the risks involved. A risk assessment methodology and toolset have been developed which are specific to software systems. This paper describes the concepts of the methodology, with emphasis on the experience of designing a toolset to support the methodology. Also presented are results of applying the methodology to two real software-based products: the software toolset itself, and a network firewall.

  6. Stand Alone Battery Thermal Management System

    SciTech Connect (OSTI)

    Brodie, Brad

    2015-09-30

    The objective of this project is research, development and demonstration of innovative thermal management concepts that reduce the cell or battery weight, complexity (component count) and/or cost by at least 20%. The project addresses two issues that are common problems with current state of the art lithium ion battery packs used in vehicles; low power at cold temperatures and reduced battery life when exposed to high temperatures. Typically, battery packs are “oversized” to satisfy the two issues mentioned above. The first phase of the project was spent making a battery pack simulation model using AMEsim software. The battery pack used as a benchmark was from the Fiat 500EV. FCA and NREL provided vehicle data and cell data that allowed an accurate model to be created that matched the electrical and thermal characteristics of the actual battery pack. The second phase involved using the battery model from the first phase and evaluate different thermal management concepts. In the end, a gas injection heat pump system was chosen as the dedicated thermal system to both heat and cool the battery pack. Based on the simulation model. The heat pump system could use 50% less energy to heat the battery pack in -20°C ambient conditions, and by keeping the battery cooler at hot climates, the battery pack size could be reduced by 5% and still meet the warranty requirements. During the final phase, the actual battery pack and heat pump system were installed in a test bench at DENSO to validate the simulation results. Also during this phase, the system was moved to NREL where testing was also done to validate the results. In conclusion, the heat pump system can improve “fuel economy” (for electric vehicle) by 12% average in cold climates. Also, the battery pack size, or capacity, could be reduced 5%, or if pack size is kept constant, the pack life could be increased by two years. Finally, the total battery pack and thermal system cost could be reduced 5% only if the

  7. Energy Management Systems Package for Small Commercial Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Package for Small Commercial Buildings Energy Management Systems Package for Small ... Heat Pump - 2013 Peer Review Buildings Performance Database - 2013 BTO Peer

  8. Energy Management and Information Systems Study - 2014 BTO Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Information Systems Study - 2014 BTO Peer Review Energy Management and Information Systems Study - 2014 BTO Peer Review Presenter: Jessica Granderson, Lawrence Berkeley ...

  9. PIA - HSS Electronic Visitor Management System (HSEVMS) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho ...

  10. Legacy system retirement plan for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Adams, D.E.

    1998-09-29

    The implementation of the Business Management System (BMS) will replace a number of systems currently in use at Hanford. These systems will be retired when the replacement is complete and the data from the old systems adequately stored and/or converted to the new system. The replacement is due to a number of factors: (1) Year 2000 conversion: Most of the systems being retired are not year 2000 compliant. Estimates on making these systems compliant approach the costs of replacing with the enterprise system. (2) Many redundant custom-made systems: Maintenance costs on the aging custom developed systems is high. The systems also have overlapping functionality. Replacement with an enterprise system is expected to lower the maintenance costs. (3) Shift inefficient/complex work processes to commercial standards: Many business practices have been developed in isolation from competitive pressures and without a good business foundation. Replacement of the systems allows an opportunity to upgrade the business practices to conform to a market driven approach. (4) Questionable legacy data: Significant amount of data contained within the legacy systems is of questionable origin and value. Replacement of the systems allows for a new beginning with a clean slate and stronger data validation rules. A number of the systems being retired depend on hardware and software technologies that are no longer adequately supported in the market place. The IRM Application Software System Life Cycle Standards, HNF-PRO-2778, and the Data Systems Review Board (DSRB) define a system retirement process which involves the removal of an existing system from active support or use either by: ceasing its operation or support; or replacing it with a new system; or replacing it with an upgraded version of the existing system. It is important to note, that activities associated with the recovery of the system, once archived, relates to the ability for authorized personnel to gain access to the data and

  11. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Mohr, Joseph J.; Barkhouse, Wayne; Beldica, Cristina; Bertin, Emmanuel; Dora Cai, Y.; Nicolaci da Costa, Luiz A.; Darnell, J.Anthony; Daues, Gregory E.; Jarvis, Michael; Gower, Michelle; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

    2008-07-01

    The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  12. LED lamp power management system and method

    DOE Patents [OSTI]

    Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

    2013-03-19

    An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

  13. Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006

    Broader source: Energy.gov [DOE]

    Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report. In accordance with the mandate of the U.S.-Canada Power Outage Task Force, the...

  14. Enterprise Assessments Targeted Review of the Safety System Management of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Secondary Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 | Department of Energy System Management of the Secondary Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 Enterprise Assessments Targeted Review of the Safety System Management of the Secondary Confinement System and Power

  15. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  16. Departmental Integrated Safety Management System (9-23-10)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-09-23

    This directive will convert and consolidate DOE M 450.4-1, Integrated Safety Management System Manual and DOE M 411.1-1C, Safety Management Functions, Responsibilities, and Authorities Manual into a single Order.

  17. Project Management and Systems Support | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Project Management and Systems Support Goal NNSA strives to ensure that its projects are well managed, and receive appropriate visibility and support within its headquarters programs. Additionally, it works to improve project management policies and practices throughout NNSA. Means and Strategies NNSA will accomplish this goal by providing its federal project directors, federal and contractor program managers, and other key project management personnel with: 1)

  18. Calpine Power Management LLC | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Calpine Power Management LLC Place: Texas Phone Number: 713.830.2000 Website: www.calpine.com Outage Hotline: 713.830.2000 References: EIA Form...

  19. Cryptographic Trust Management System Design Document

    SciTech Connect (OSTI)

    Edgar, Thomas W.; Clements, Samuel L.; Hadley, Mark D.; Maiden, Wendy M.; Manz, David O.; Zabriskie, Sean J.

    2010-08-04

    Deliverable for DOE NSTB Cryptographic Trust Management project. Design document to follow the Requirements document submitted in Sept 2009.

  20. Energy Management for Motor-Driven Systems

    Broader source: Energy.gov [DOE]

    This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

  1. Energy Management for Motor Driven Systems

    SciTech Connect (OSTI)

    2000-02-01

    This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

  2. Battery Thermal Management System Design Modeling

    SciTech Connect (OSTI)

    Pesaran, A.; Kim, G. H.

    2006-11-01

    Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

  3. Waste Information Management System-2012 - 12114

    SciTech Connect (OSTI)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.; Roelant, D.

    2012-07-01

    The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has

  4. A knowledge-based method for making restoration plan of bulk power system

    SciTech Connect (OSTI)

    Shimakura, K.; Inagaki, J.; Matsunoki, Y. (Hokkaido Univ., Sapporo (Japan). Faculty of Science); Ito, M.; Fukui, S.; Hori, S. (Mitsubishi Electric Corp., 1-1-2 Wadasaki-cho, Hyogo-ku, Kobe (JP))

    1992-05-01

    In this paper a knowledge-based method is proposed for use in event of power system outages. This method uses general-purpose restoration knowledge not dependent on pre-outage system states in order to generate post-restoration target systems in which post-outage systems are taken as initial states. Conventionally post-outage system states are formed to emulate as closely as possible pre-outage system states, with system operations performed only within blackout systems. Therefore, depending on the amount of pre-outage load, some outage loads may be experienced in the restored system. Proposed here is a method by which system operations in both blackout systems and sound systems are combined according to the amount of load in the pre-outage systems, so that post-restoration system states with minimal outage loads from post-outage systems will be generated. A prototype system incorporating actual power systems and utilizing this method was built and tested under simulated conditions. The effectiveness of the proposed system is discussed on the basis of the test results.

  5. Energy management system for a rotary machine and method therefor

    DOE Patents [OSTI]

    Bowman, Michael John; Sinha, Gautam; Sheldon, Karl Edward

    2004-11-09

    In energy management system is provided for a power generating device having a working fluid intake in which the energy management system comprises an electrical dissipation device coupled to the power generating device and a dissipation device cooling system configured to direct a portion of a working fluid to the electrical dissipation device so as to provide thermal control to the electrical dissipation device.

  6. Voices of Experience | Advanced Distribution Management Systems_brochure.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Insights into Advanced Distribution Management Systems VOICES of Experience February, 2015 Prepared for the U.S. Department of Energy by the National Renewable Energy Laboratory under contract No. DE-AC36-08G028308, Subtask SG10.1011 in conjunction with Energetics Incorporated under contract No. GS-10F-0103J, Subtask J3806.0002. INSIGHTS INTO ADVANCED DISTRIBUTION MANAGEMENT SYSTEMS | DOE 3 Voices of Experience | Advanced Distribution Management Systems When people think of the electric power

  7. Guidance for FY2014 Facilities Information Management System Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validations | Department of Energy FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations FY 2014 FIMS Data Validation Guidance w MEMO.pdf (10.9 MB) More Documents & Publications Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations Deputy Secretary Memo on Improving DOE-wide Recruitment and Hiring Processes FY2012 Three

  8. Spent Nuclear Fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-10-03

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  9. Energy.gov Content Management System Requirements and Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Energy.gov Content Management System Requirements and Guidance Energy.gov Content Management System Requirements and Guidance The Office of Energy Efficiency and Renewable Energy's (EERE's) websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office. Learn more about Energy.gov's Drupal CMS requirements and guidance for: Page types Block types Linking File naming conventions Optimizing

  10. ISO 50001 Conformant Energy Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ISO 50001 Conformant Energy Management Systems ISO 50001 Conformant Energy Management Systems Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review commlbldgs04_mckane_040213.pdf (1.09 MB) More Documents & Publications Becoming a Certified Practitioner or a Certified Energy Engineer The Do and Check Processes of an Energy Management System Superior Energy Performance: Getting the Most Value from ISO 50001