Sample records for options project info

  1. Real Options for Project Schedules (ROPS)

    E-Print Network [OSTI]

    Ingber, Lester

    2007-01-01T23:59:59.000Z

    Real Options for Project Schedules (ROPS) has three recursive sampling/optimization shells. An outer Adaptive Simulated Annealing (ASA) optimization shell optimizes parameters of strategic Plans containing multiple Projects containing ordered Tasks. A middle shell samples probability distributions of durations of Tasks. An inner shell samples probability distributions of costs of Tasks. PATHTREE is used to develop options on schedules.. Algorithms used for Trading in Risk Dimensions (TRD) are applied to develop a relative risk analysis among projects.

  2. Understanding Leasing Options for Energy Projects

    E-Print Network [OSTI]

    Davenport, B.

    2005-01-01T23:59:59.000Z

    UNDERSTANDING LEASING OPTIONS FOR ENERGY PROJECTS Baker Davenport Davenport Finance Company Richmond, Virginia Industrials often find it difficult to fund energy projects with internal monies. Energy projects must compete with the company...?s ?core? assets for capital dollars. Leasing can be used to overcome some of these hurdles. Topics of discussion will include several key leasing structures, with benefits and disadvantages noted. Project financing is also discussed as a way...

  3. Real options "in" projects and systems design : identification of options and solutions for path dependency

    E-Print Network [OSTI]

    Wang, Tao, 1973-

    2005-01-01T23:59:59.000Z

    This research develops a comprehensive approach to identify and deal with real options in" projects, that is, those real options (flexibility) that are integral parts of the technical design. It represents a first attempt ...

  4. Impacts of project management on real option values

    E-Print Network [OSTI]

    Bhargav, Shilpa Anandrao

    2005-02-17T23:59:59.000Z

    reduces the value of real options. The example of resource allocation is used to test this hypothesis. Based on the results, it is concluded that project management reduces the value of real options by reducing variance of the exercise signal...

  5. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    Coggeshall. 2008. Solar Photovoltaic Financing: DeploymentEconomics of Commercial Photovoltaic Systems in California.Financing Non-Residential Photovoltaic Projects: Options and

  6. Real options : a way to deal with market uncertainty in real estate development projects

    E-Print Network [OSTI]

    Kim, Kyungwon

    2008-01-01T23:59:59.000Z

    The practice of applying options theory to real estate investments has only recently begun. In particular, options in real estate are called "real options." Real options add value to real estate development projects by ...

  7. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect (OSTI)

    Cipparone, L.

    1980-10-15T23:59:59.000Z

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  8. Project Information Form Project Title White Paper of Assessing Transportation Financing Options from a Green

    E-Print Network [OSTI]

    California at Davis, University of

    or organization) US DOT $23,700 Total Project Cost $23,700 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper of Assessing Transportation Financing Options and End Dates June 15, 2014 to August 31, 2014 Brief Description of Research Project The Highway Trust

  9. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    option embedded in a solar PPA or lease be priced no lowerit harder to sell solar PPAs or leases. 2) Credit Quality:post-flip). A lease enables the solar PPA provider to, in

  10. Real Option Pricing with Mean-Reverting Investment and Project Value

    E-Print Network [OSTI]

    Zubelli, Jorge Passamani

    is the valuation of the option to the invest in an oil field. Like most commodities, oil prices tend to mean-revert, and as a direct result the value of investment in an oil field is also mean-reverting. Consequently, it wouldReal Option Pricing with Mean-Reverting Investment and Project Value Sebastian Jaimungal , Max

  11. Valuation of Governmental Guarantee in BOT Project Finance with Real Option Analysis

    E-Print Network [OSTI]

    Jun, Jae Bum

    2010-01-14T23:59:59.000Z

    .......................................................................................... 80 6.2 Basic Assumptions in a BOT Project Valuation .................................. 80 6.3 Data Collection..................................................................................... 83 6.4 Method 1 - Valuation of BOT Project... with NPV Analysis.................. 84 6.5 Method 2 - Valuation of BOT Project with Cheah and Liu?s Real Option Model ....................................................................................... 87 6.6 Method 3 - Valuation of BOT...

  12. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    of panel titled “Financing Residential and Small CommercialL ABORATORY Financing Non-Residential Photovoltaic Projects:1 2. Policy Support for Non-Residential PV

  13. Real Option Pricing with Mean-Reverting Investment and Project Value

    E-Print Network [OSTI]

    Zubelli, Jorge Passamani

    to the invest in an oil field. Like most commodities, oil prices tend to mean-revert, and as a direct resultReal Option Pricing with Mean-Reverting Investment and Project Value October 1st, 2009 #12;Abstract to invest in a project enjoy a long and dis- tinguished history. The classical work of McDonald and Siegel

  14. Optional 2012 Project Management Workshop Course | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's Impact on Our National-Projects in the United States

  15. Course info Machine Learning

    E-Print Network [OSTI]

    Shi, Qinfeng "Javen"

    Course info Machine Learning Real life problems Lecture 1: Machine Learning Problem Qinfeng (Javen) Shi 28 July 2014 Intro. to Stats. Machine Learning COMP SCI 4401/7401 Qinfeng (Javen) Shi Lecture 1: Machine Learning Problem #12;Course info Machine Learning Real life problems Table of Contents I 1 Course

  16. Financing Non-Residential Photovoltaic Projects: Options and Implications

    SciTech Connect (OSTI)

    Bolinger, Mark

    2009-01-09T23:59:59.000Z

    Installations of grid-connected photovoltaic (PV) systems in the United States have increased dramatically in recent years, growing from less than 20 MW in 2000 to nearly 500 MW at the end of 2007, a compound average annual growth rate of 59%. Of particular note is the increasing contribution of 'non-residential' grid-connected PV systems--defined here as those systems installed on the customer (rather than utility) side of the meter at commercial, institutional, non-profit, or governmental properties--to the overall growth trend. Although there is some uncertainty in the numbers, non-residential PV capacity grew from less than half of aggregate annual capacity installations in 2000-2002 to nearly two-thirds in 2007. This relative growth trend is expected to have continued through 2008. The non-residential sector's commanding lead in terms of installed capacity in recent years primarily reflects two important differences between the non-residential and residential markets: (1) the greater federal 'Tax Benefits'--including the 30% investment tax credit (ITC) and accelerated tax depreciation--provided to commercial (relative to residential) PV systems, at least historically (this relative tax advantage has largely disappeared starting in 2009) and (2) larger non-residential project size. These two attributes have attracted to the market a number of institutional investors (referred to in this report as 'Tax Investors') seeking to invest in PV projects primarily to capture their Tax Benefits. The presence of these Tax Investors, in turn, has fostered a variety of innovative approaches to financing non-residential PV systems. This financial innovation--which is the topic of this report--has helped to overcome some of the largest barriers to the adoption of non-residential PV, and is therefore partly responsible (along with the policy changes that have driven this innovation) for the rapid growth in the market seen in recent years.ii Specifically, due to financial innovation, non-residential entities interested in PV no longer face prohibitively high up-front costs, no longer need to be able to absorb Tax Benefits in order to make the economics pencil out, no longer need to be able to operate and maintain the system, and no longer need to accept the risk that the system does not perform as expected.

  17. CONTACT INFO BUILDING SHELTER

    E-Print Network [OSTI]

    King, David G.

    CONTACT INFO SIGNALS BUILDING SHELTER THE DISABLED B.E.R.T. TEAM B.E.R.T.* EMERGENCY RESPONSE GUIDE, SIUC*Building Emergency Response Team Siren* Long Blast: Tornado High/Low: Any Other Emergency Radio needed. 2. Find two or three B.E.R.T. "buddies" who are willing to help you in the event of an emergency

  18. LinShim6 -Implementation of the Shim6 protocol http://inl.info.ucl.ac.be/LinShim6

    E-Print Network [OSTI]

    Bonaventure, Olivier

    LinShim6 - Implementation of the Shim6 protocol http://inl.info.ucl.ac.be/LinShim6 Documentation at http://inl.info.ucl. ac.be/publications/shim6-masterthesis. Like the whole project, this documentation

  19. Statement of Work- Optional Service Offerings for Contractor-Identified Project

    Broader source: Energy.gov [DOE]

    Spreadsheet features optional Federal Energy Management Program (FEMP) services for energy savings performance contracts (ESPCs).

  20. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01T23:59:59.000Z

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  1. Creating a practical model using real options to evaluate large-scale real estate development projects

    E-Print Network [OSTI]

    Hengels, Adam (Adam P.)

    2005-01-01T23:59:59.000Z

    Real Options analysis has only begun to be recognized as way to evaluate real estate and is considered "beyond the cutting edge" of financial analysis. Several academic papers have looked at ways that real estate can be ...

  2. Techno-economic analysis of renewable energy source options for a district heating project

    SciTech Connect (OSTI)

    Ghafghazi, S. [University of British Columbia, Vancouver; Sowlati, T. [University of British Columbia, Vancouver; Sokhansanj, Shahabaddine [ORNL; Melin, Staffan [University of British Columbia, Vancouver

    2009-09-01T23:59:59.000Z

    With the increased interest in exploiting renewable energy sources for district heating applications, the economic comparison of viable options has been considered as an important step in making a sound decision. In this paper, the economic performance of several energy options for a district heating system in Vancouver, British Columbia, is studied. The considered district heating system includes a 10 MW peaking/ backup natural gas boiler to provide about 40% of the annual energy requirement and a 2.5 MW base-load system. The energy options for the base-load system include: wood pellet, sewer heat, and geothermal heat. Present values of initial and operating costs of each system were calculated over 25-year service life of the systems, considering depreciation and salvage as a negative cost item. It was shown that the wood pellet heat producing technologies provided less expensive energy followed by the sewer heat recovery, geothermal and natural gas systems. Among wood pellet technologies, the grate burner was a less expensive option than powder and gasifier technologies. It was found that using natural gas as a fuel source for the peaking/backup system accounted for more than 40% of the heat production cost for the considered district heating center. This is mainly due to the high natural gas prices which cause high operating costs over the service life of the district heating system. Variations in several economic inputs did not change the ranking of the technology options in the sensitivity analysis. However, it was found that the results were more sensitive to changes in operating costs of the system than changes in initial investment. It is economical to utilize wood pellet boilers to provide the base-load energy requirement of district heating systems Moreover, the current business approach to use natural gas systems for peaking and backup in district heating systems could increase the cost of heat production significantly.

  3. Local Option- Building Permit Fee Waivers for Renewable Energy Projects (Connecticut)

    Broader source: Energy.gov [DOE]

    As of July 2011, Connecticut authorizes municipalities to pass a local ordinance to exempt "Class I" renewable energy projects from paying building permit fees. Class I renewable energy projects...

  4. Statement of Work - Optional Service Offerings for Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work - Optional Service Offerings for Contractor-Identified Project Statement of Work - Optional Service Offerings for Contractor-Identified Project Spreadsheet features optional...

  5. TANK SPACE OPTIONS REPORT

    SciTech Connect (OSTI)

    WILLIS WL; AHRENDT MR

    2009-08-11T23:59:59.000Z

    Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

  6. Thesis Dissertation Seminar Papers No paper Research Papers Graduate Projects Exhibition Course Work Option

    E-Print Network [OSTI]

    Lesser, Larry

    Thesis Dissertation Seminar Papers No paper Research Papers Graduate Projects Exhibition Course) 3) Outside Member: 4) 5) Graduate Advisor Date Graduate School Date Students are urged to study the general requirements for graduate degrees stated in the Graduate Studies Catalog. Students are responsible

  7. Greenhouse Emission Reductions and Natural Gas Vehicles: A Resource Guide on Technology Options and Project Development

    SciTech Connect (OSTI)

    Orestes Anastasia; NAncy Checklick; Vivianne Couts; Julie Doherty; Jette Findsen; Laura Gehlin; Josh Radoff

    2002-09-01T23:59:59.000Z

    Accurate and verifiable emission reductions are a function of the degree of transparency and stringency of the protocols employed in documenting project- or program-associated emissions reductions. The purpose of this guide is to provide a background for law and policy makers, urban planners, and project developers working with the many Greenhouse Gas (GHG) emission reduction programs throughout the world to quantify and/or evaluate the GHG impacts of Natural Gas Vehicle (NGVs). In order to evaluate the GHG benefits and/or penalties of NGV projects, it is necessary to first gain a fundamental understanding of the technology employed and the operating characteristics of these vehicles, especially with regard to the manner in which they compare to similar conventional gasoline or diesel vehicles. Therefore, the first two sections of this paper explain the basic technology and functionality of NGVs, but focus on evaluating the models that are currently on the market with their similar conventional counterparts, including characteristics such as cost, performance, efficiency, environmental attributes, and range. Since the increased use of NGVs, along with Alternative Fuel Vehicle (AFVs) in general, represents a public good with many social benefits at the local, national, and global levels, NGVs often receive significant attention in the form of legislative and programmatic support. Some states mandate the use of NGVs, while others provide financial incentives to promote their procurement and use. Furthermore, Federal legislation in the form of tax incentives or procurement requirements can have a significant impact on the NGV market. In order to implement effective legislation or programs, it is vital to have an understanding of the different programs and activities that already exist so that a new project focusing on GHG emission reduction can successfully interact with and build on the experience and lessons learned of those that preceded it. Finally, most programs that deal with passenger vehicles--and with transportation in general--do not address the climate change component explicitly, and thus there are few GHG reduction goals that are included in these programs. Furthermore, there are relatively few protocols that exist for accounting for the GHG emissions reductions that arise from transportation and, specifically, passenger vehicle projects and programs. These accounting procedures and principles gain increased importance when a project developer wishes to document in a credible manner, the GHG reductions that are achieved by a given project or program. Section four of this paper outlined the GHG emissions associated with NGVs, both upstream and downstream, and section five illustrated the methodology, via hypothetical case studies, for measuring these reductions using different types of baselines. Unlike stationary energy combustion, GHG emissions from transportation activities, including NGV projects, come from dispersed sources creating a need for different methodologies for assessing GHG impacts. This resource guide has outlined the necessary context and background for those parties wishing to evaluate projects and develop programs, policies, projects, and legislation aimed at the promotion of NGVs for GHG emission reduction.

  8. info

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf TheViolationsRio Blanco ResponsibleSuite 600, 1901 North8-03R13

  9. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    SciTech Connect (OSTI)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

    2009-04-29T23:59:59.000Z

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

  10. Hawaii energy strategy project 2: Fossil energy review. Task 3 -- Greenfield options: Prospects for LNG use

    SciTech Connect (OSTI)

    Breazeale, K. [ed.; Fesharaki, F.; Fridley, D.; Pezeshki, S.; Wu, K.

    1993-12-01T23:59:59.000Z

    This paper begins with an overview of the Asia-Pacific LNG market, its major players, and the likely availability of LNG supplies in the region. The discussion then examines the possibilities for the economic supply of LNG to Hawaii, the potential Hawaiian market, and the viability of an LNG project on Oahu. This survey is far from a complete technical assessment or an actual engineering/feasibility study. The economics alone cannot justify LNG`s introduction. The debate may continue as to whether fuel diversification and environmental reasons can outweigh the higher costs. Several points are made. LNG is not a spot commodity. Switching to LNG in Hawaii would require a massive, long-term commitment and substantial investments. LNG supplies are growing very tight in the Asia-Pacific region. Some of the environmental benefits of LNG are not entirely relevant in Hawaii because Hawaii`s air quality is generally excellent. Any air quality benefits may be more than counterbalanced by the environmental hazards connected with large-scale coastal zone construction, and by the safety hazards of LNG carriers, pipelines, etc. Lastly, LNG is not suitable for all energy uses, and is likely to be entirely unsuitable for neighbor island energy needs.

  11. Info Lit @ Mac Economics 2K03

    E-Print Network [OSTI]

    Haykin, Simon

    Info Lit @ Mac Economics 2K03 Canadian Economic History Amanda Etches-Johnson Reference Librarian email/MSN: library@mcmaster.ca September 14, 2006 #12;Info Lit @ Mac Economics 2K03 Canadian Economic History Olga Perkovic Reference Librarian email/MSN: library@mcmaster.ca September 21, 2006 #12;Economics

  12. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  13. Sustainability Double Degree Double Degree Info

    E-Print Network [OSTI]

    Grünwald, Niklaus J.

    Sustainability Double Degree Double Degree Info: · 36 credits in B for graduation. Sustainability Core: Take each course below for a total of 17 -20 credits. Term/Grade Course _____ ____ *NR 350 (4) Sustainable

  14. Assessing Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

  15. ch1_General_Info

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    technology for the reuse of Carbon dioxide (CO 2 ) emissions from industrial sources for green energy products. This project would use CO 2 to grow algae for the production of...

  16. Columbia University Panhellenic www.columbiagreeks.info

    E-Print Network [OSTI]

    Hone, James

    Columbia University Panhellenic www.columbiagreeks.info Contact: Samantha Goldfarb President Columbia Panhellenic Council Slgoldfarb2010@gmail.com Elizabeth Carrolo Vice President of Marketing and Public Relations Columbia Panhellenic Council esc2156@columbia.edu January 24, 2013 PANHELLENIC FORMAL

  17. Columbia University Panhellenic www.columbiagreeks.info

    E-Print Network [OSTI]

    Hone, James

    Columbia University Panhellenic www.columbiagreeks.info Contact: Kara B. Mantooth Director AT COLUMBIA UNIVERSITY Brentwood, Tenn.--Alpha Omicron Pi is pleased to formally begin our colonization efforts to join the Greek community at Columbia University. AOII's colonization events conclude a semester

  18. Property:StratInfo | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellhead Jump to: navigation,SmallWindWebsiteStratInfo Jump

  19. InfoSpi Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (bot load) Error 429IndianaProfessional JumpInfoSpi Inc Jump to:

  20. Financing Options

    Broader source: Energy.gov [DOE]

    A growing variety of options are available for financing an LED street lighting replacement program. One or another approach may be preferable based on the system ownership and maintenance model in...

  1. Communication Needs and Integration Options

    E-Print Network [OSTI]

    " links that carry data from smart meters to the control center. The consensus on HAN technologiesCommunication Needs and Integration Options for AMI in the Smart Grid Future Grid Initiative White System #12;Communication Needs and Integration Options for AMI in the Smart Grid Prepared for the Project

  2. Communication Needs and Integration Options

    E-Print Network [OSTI]

    home area networks (HANs) than "backhaul" links that carry data from smart meters to the control centerCommunication Needs and Integration Options for AMI in the Smart Grid Future Grid Initiative White System #12;Communication Needs and Integration Options for AMI in the Smart Grid Prepared for the Project

  3. What's the Option?

    E-Print Network [OSTI]

    Traeger, Christian

    2013-01-01T23:59:59.000Z

    option value. Second, the real options literature developed1994) spread the work on real options analysis to a broadis known as the real options approach. Translated into our

  4. InfoCrystal: A visual tool for information retrieval

    E-Print Network [OSTI]

    Spoerri, Anselm

    of interest. The InfoCrystal allows users to specify Boolean as well as vector-space queries graphically continuous, multi-variate fields that vary over space and time. Hence, the transformation problem the InfoCrystalTM, that can be used as a visualiza- tion tool as well as a visual query language to help

  5. Macintosh HD:Users:z095994:Desktop:Exits:2013_LAHotel_Info.docx Hotel Info in Los Alamos

    E-Print Network [OSTI]

    , NM 87544 505-672-3838 Holiday Inn Express at Entrada Park 60 Entrada Dr. Los Alamos, NM 87544 505Macintosh HD:Users:z095994:Desktop:Exits:2013_LAHotel_Info.docx Hotel Info in Los Alamos of hotels in Los Alamos: Adobe Pines Bed & Breakfast 2101 Loma Linda Dr. Los Alamos, NM 87544 505

  6. postdoc:Postdoc Program:Career Fair:2013:2013_LAHotel_Info.doc Hotel Info in Los Alamos

    E-Print Network [OSTI]

    -672-3838 Holiday Inn Express at Entrada Park 60 Entrada Dr. Los Alamos, NM 87544 505-661-2646 Motel 6 2175 Trinitypostdoc:Postdoc Program:Career Fair:2013:2013_LAHotel_Info.doc Hotel Info in Los Alamos of hotels in Los Alamos: Adobe Pines Bed & Breakfast 2101 Loma Linda Dr. Los Alamos, NM 87544 505

  7. A streamlined real options model for Real Estate Development

    E-Print Network [OSTI]

    Barman, Baabak

    2007-01-01T23:59:59.000Z

    This thesis introduces a streamlined model that incorporates the value of the real options that exist in real estate development projects. Real options add value to a project by providing developers with flexibility to ...

  8. Methodology for Assessing Greenhouse Gas Emissions and Assessing Mitigation Options for On-Road Mobile Sources Project for the Houston-Galveston Area Council

    E-Print Network [OSTI]

    Methodology for Assessing Greenhouse Gas Emissions and Assessing Mitigation Options for On reductions in GHG, and b) use analytical tools/methods to assess the emissions reductions possible through and prioritized based on factors such as cost effectiveness, potential for emission reductions, and applicability

  9. 2nd RESPOND project Workshop "Id tifi ti d l f k t b d ti"Identification and analyses of market-based response options

    E-Print Network [OSTI]

    pricing A t ti l d t l Nickel-Hydride, Lithium-Ion, Polymer, Metal-air (Zn, Al, Mg) Compressed air energy-based response options aimed at increasing the contribution of variable energy resources such as Wind, technology) ­ Storage of electricity or heat 4 ­ Storage of electricity or heat ­ New demand technologies

  10. PsycINFO user guide citations summaries abstracts

    E-Print Network [OSTI]

    Martin, Stephen John

    the period you wish to search. #12;2 PsycINFO user guide September 2002 Enter your search term or terms) will search all of the records for your search term. If you want to limit your search to an author or a title search, select from the drop down button alongside "Find Terms" (marked below). Find Terms: Anyw here

  11. www.d-waste.com info@d-waste.com

    E-Print Network [OSTI]

    , the International Solid Waste Association, GIZ/SWEEP-Net, the Waste to Energy Research Council (WTERT) and the Solidwww.d-waste.com info@d-waste.com Acharnon 141 10446 ATHENS GREECE T: +30 2155302449 F: +30 2155302447 For Release November 13, 2013 Waste Atlas shows how the world handles its refuse D-Waste

  12. http://energyefficientmechanism.blogspot.com/ http://mechanicalresearch.info/

    E-Print Network [OSTI]

    Kostic, Milivoje M.

    by Energyefficient Mechanism at 11:05 PM Wednesday, February 4, 2009 Stationary hydraulic force can help to rotate by Energyefficient Mechanism at 7:41 AM Friday, October 10, 2008 Energy Security, Global Warming and Engineering://mechanicalresearch.info/report.pdf Posted by Energyefficient Mechanism at 4:00 AM Thursday, July 17, 2008 Stationary Force Can Be Utilized

  13. Chemistry in Higher What's available and where is the info?

    E-Print Network [OSTI]

    Anderson, Jim

    Chemistry in Higher Education What's available and where is the info? What does studying chemistry? Where does it lead and what might a chemistry career look like? Dr. David Read, Director of Outreach 2013 #12;310 (294) HE courses with chemistry offered as a single subject hosted at 53 universities 699

  14. Donnerstag, 24. Juli 2003 Biomasse Info-Zentrum

    E-Print Network [OSTI]

    Centre Biogas - fuel cell Dust engine/-turbine ORC--process Hot Gasturbine Gasification - engine-engine Steamprocess Bioethanol - engine Methanol - engine* Methanol - fuel cell* Co- Combustion Biogas Methan - fuel 8 Biomasse Info-Zentrum Biomass Information Centre Internal Combustion Engine, Biogas #12;Donnerstag

  15. Introduction to Options

    E-Print Network [OSTI]

    Mintert, James R.; Welch, Mark

    2009-01-07T23:59:59.000Z

    Options give the agricultural industry a flexible pricing tool to assist in price risk managment. This publication defines an option and gives a brief introduction to this tool....

  16. Assessments InfoCenter | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orA BRIEFApril 2015 Project DashboardArleneAssessments

  17. Info-F-205 : Solutions TP1 Introduction

    E-Print Network [OSTI]

    Bontempi, Gianluca

    Info-F-205 : Solutions TP1 Introduction Matlab : Matrix Laboratory Interpréteur avec une structure Possibilités graphiques commande plot(x,y) 2 séries de valeurs de même taille 1 graphe. Exemple : x = -pi:0 après dans un même graphe. On peut voir le résultat dans la Figure 1. 2 #12;Structures de contrôle pour

  18. STBPO-PostDoc:Postdoc Program:Career Fair:2013:2013_LAHotel_Info.doc Hotel Info in Los Alamos

    E-Print Network [OSTI]

    Express at Entrada Park 60 Entrada Dr. Los Alamos, NM 87544 505-661-2646 Motel 6 2175 Trinity Dr. LosSTBPO-PostDoc:Postdoc Program:Career Fair:2013:2013_LAHotel_Info.doc Hotel Info in Los Alamos of hotels in Los Alamos: Adobe Pines Bed & Breakfast 2101 Loma Linda Dr. Los Alamos, NM 87544 505

  19. Solar Schools Assessment and Implementation Project: Financing...

    Broader source: Energy.gov (indexed) [DOE]

    on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools This report focuses on financial options developed...

  20. OPTIONS for ENERGY EFFICIENCY

    E-Print Network [OSTI]

    OPTIONS for ENERGY EFFICIENCY in EXISTING BUILDINGS December 2005 CEC-400-2005-039-CMF;OPTIONS FOR ENERGY EFFICIENCY in EXISTING BUILDINGS COMMISSION REPORT TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................iii California's Successful Energy Efficiency Programs

  1. Natural Gas Purchasing Options

    E-Print Network [OSTI]

    Watkins, G.

    As a result of economic and regulatory changes, the natural gas marketplace now offers multiple options for purchasers. The purpose of this panel is to discuss short-term purchasing options and how to take advantage of these options both to lower...

  2. Secondary Energy InfoBook | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar PowerstoriesNrelPartnerTypePonsa, Mallorca: EnergySecondary Energy InfoBook Jump

  3. Socioeconomic effects of DRAFT power marketing options of the Central Valley and Washoe Projects: 2005 regional economic impact analysis using IMPLAN

    SciTech Connect (OSTI)

    Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

    1996-04-01T23:59:59.000Z

    This report summarizes the methods and conclusions of an economic analysis of the distributional effects of alternative actions that Sierra Nevada could take with its new marketing plan. These alternatives are summarized in the agency`s Environmental Impact Statement (EIS), and this study directly supports the findings in the EIS. The study evaluates the potential economic impacts projected to occur across the northern and central California area currently serviced by Sierra Nevada`s customers. A standard input-output estimation approach was used to calculate impacts on regional output, labor income, and employment. The IMPLAN regional economic modeling system was used to develop regional models for the analysis. Individual regional models were developed for the overall area, the San Francisco Consolidated Metropolitan Statistical Area, the Sacramento Consolidated Metropolitan Statistical Area, the Redding Metropolitan Statistical Area, and the Bakersfield Metropolitan Statistical Area. The analysis relies on information about the effect of Sierra Nevada`s alternative actions on overall system power costs for the year 2005 developed by RW Beck and Associates (Beck-1996). This information is used as input to the 2005 benchmarked IMPLAN regional economic models. The resulting economic impact estimates are inextricably linked to this input information about changes in system power costs, and the estimates reported here are of similar relative magnitude to those estimates. The potential economic effects of Sierra Nevada`s actions are extremely small in relation to the size of the economies potentially affected, and, although they are calculable, they are not significant and often difficult to separate from random error present in the models.

  4. Alan Turing's Legacy: Info-Computational Philosophy of Nature

    E-Print Network [OSTI]

    Gordana Dodig-Crnkovic

    2012-07-03T23:59:59.000Z

    Alan Turing's pioneering work on computability, and his ideas on morphological computing support Andrew Hodges' view of Turing as a natural philosopher. Turing's natural philosophy differs importantly from Galileo's view that the book of nature is written in the language of mathematics (The Assayer, 1623). Computing is more than a language of nature as computation produces real time physical behaviors. This article presents the framework of Natural Info-computationalism as a contemporary natural philosophy that builds on the legacy of Turing's computationalism. Info-computationalism is a synthesis of Informational Structural Realism (the view that nature is a web of informational structures) and Natural Computationalism (the view that nature physically computes its own time development). It presents a framework for the development of a unified approach to nature, with common interpretation of inanimate nature as well as living organisms and their social networks. Computing is understood as information processing that drives all the changes on different levels of organization of information and can be modeled as morphological computing on data sets pertinent to informational structures. The use of infocomputational conceptualizations, models and tools makes possible for the first time in history the study of complex selforganizing adaptive systems, including basic characteristics and functions of living systems, intelligence, and cognition.

  5. MSW Registration Info/ 1 10/11/13 TO: MSW Students

    E-Print Network [OSTI]

    Thomas, Andrew

    MSW Registration Info/ 1 10/11/13 MEMO TO: MSW Students FROM: Sandy Butler, MSW Coordinator DATE Licensure for students in the Full "Regular" MSW and Advanced Standing programs.Please note the distinction the last five years and are thus completing the MSW program with fewer credits #12;MSW Registration Info/ 2

  6. Pawnee Nation Energy Option Analyses

    SciTech Connect (OSTI)

    Matlock, M.; Kersey, K.; Riding In, C.

    2009-07-31T23:59:59.000Z

    In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribe’s energy vision. The overarching goals of the “first steps” project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the “best fit” energy options. Based on the request of Pawnee Nation’s Energy Task Force the research team, consisting Tribal personnel and Summit Blue Consulting, focused on a review of renewable energy resource development potential, funding sources and utility organizational along with energy savings options. Elements of the energy demand forecasting and characterization and demand side options review remained in the scope of work, but were only addressed at a high level. Description of Activities Performed Renewable Energy Resource Development Potential The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Energy Efficiency Options While this was not a major focus of the project, the research team highlighted common strategies for reducing energy use in buildings. The team also discussed the benefits of adopting a building energy code and introduced two model energy codes Pawnee Nation should consider for adoption. Summary of Current and Expected Future Electricity Usage The research team provided a summary overview of electricity usage patterns in current buildings and included discussion of known plans for new construction. Utility Options Review Pawnee Nation electric utility options were analyzed through a four-phase process, which included: 1) summarizing the relevant utility background information; 2) gathering relevant utility assessment data; 3) developing a set of realistic Pawnee electric utility service options, and 4) analyzing the various Pawnee electric utility service options for the Pawnee Energy Team’s consideration. III. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribe’s main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site.

  7. Electricity Real Options Valuation

    E-Print Network [OSTI]

    Ewa Broszkiewicz-Suwaj

    2006-08-16T23:59:59.000Z

    In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

  8. Electricity Real Options Valuation

    E-Print Network [OSTI]

    Broszkiewicz-Suwaj, E

    2006-01-01T23:59:59.000Z

    In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

  9. MAGENCO: A map generalization controller for Arc/Info

    SciTech Connect (OSTI)

    Ganter, J.H.; Cashwell, J.W.

    1994-06-01T23:59:59.000Z

    The Arc/Info GENERALIZE command implements the Douglas-Peucker algorithm, a well-regarded approach that preserves line ``character`` while reducing the number of points according to a tolerance parameter supplied by the user. The authors have developed an Arc Macro Language (AML) interface called MAGENCO that allows the user to browse workspaces, select a coverage, extract a sample from this coverage, then apply various tolerances to the sample. The results are shown in multiple display windows that are arranged around the original sample for quick visual comparison. The user may then return to the whole coverage and apply the chosen tolerance. They analyze the ergonomics of line simplification, explain the design (which includes an animated demonstration of the Douglas-Peucker algorithm), and discuss key points of the MAGENCO implementation.

  10. Automotive Deployment Option Projection Tool (ADOPT) Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EERE BlogAttachmentFlash2011-21 AuditInsulated Claddingof

  11. Video Project Option | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlongUpdatesValley wins 2015MayoXML Bookmark andVideo

  12. Efficient Computation of Info-Gap Robustness for Finite Element Models

    SciTech Connect (OSTI)

    Stull, Christopher J. [Los Alamos National Laboratory; Hemez, Francois M. [Los Alamos National Laboratory; Williams, Brian J. [Los Alamos National Laboratory

    2012-07-05T23:59:59.000Z

    A recent research effort at LANL proposed info-gap decision theory as a framework by which to measure the predictive maturity of numerical models. Info-gap theory explores the trade-offs between accuracy, that is, the extent to which predictions reproduce the physical measurements, and robustness, that is, the extent to which predictions are insensitive to modeling assumptions. Both accuracy and robustness are necessary to demonstrate predictive maturity. However, conducting an info-gap analysis can present a formidable challenge, from the standpoint of the required computational resources. This is because a robustness function requires the resolution of multiple optimization problems. This report offers an alternative, adjoint methodology to assess the info-gap robustness of Ax = b-like numerical models solved for a solution x. Two situations that can arise in structural analysis and design are briefly described and contextualized within the info-gap decision theory framework. The treatments of the info-gap problems, using the adjoint methodology are outlined in detail, and the latter problem is solved for four separate finite element models. As compared to statistical sampling, the proposed methodology offers highly accurate approximations of info-gap robustness functions for the finite element models considered in the report, at a small fraction of the computational cost. It is noted that this report considers only linear systems; a natural follow-on study would extend the methodologies described herein to include nonlinear systems.

  13. Physics & Astronomy Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    148 Physics & Astronomy Degree options BSc (Single Honours Degrees) Astrophysics Physics MPhys (Single Honours Degrees) Astrophysics Physics Theoretical Physics BSc (Joint Honours Degrees) Physics) Theoretical Physics and Mathematics MSci (Joint Honours Degree) Physics and Chemistry Entrance Requirements

  14. Mathematics & Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    132 Mathematics & Statistics Degree options MMath (Single Honours Degrees) Mathematics Applied Mathematics Pure Mathematics Statistics BSc or MA (Single Honours Degrees) Mathematics Statistics [If you wish (Joint Honours Degrees) Mathematics and one of: Biology Chemistry Computer Science Economics Geography

  15. Cogeneration System Design Options

    E-Print Network [OSTI]

    Gilbert, J. S.

    , engine, turbine, generator, switchgear, and balance of plant can be bewildering. This paper presents an overview and a systematic approach to the basic system alternatives and attributes. The presentation illustrates how these options match the electrical...

  16. Pawnee Nation Energy Option Analyses

    SciTech Connect (OSTI)

    Matlock, M.; Kersey, K.; Riding In, C.

    2009-07-21T23:59:59.000Z

    Pawnee Nation of Oklahoma Energy Option Analyses In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribe’s energy vision. The overarching goals of the “first steps” project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the “best fit” energy options. Description of Activities Performed The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribe’s main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site. Financial incentives for project development are generally structured to provide tribes with access to conventional financing mechanisms. Grant funding for project construction is currently difficult to obtain. Substantial new opportunities for bio-fuel development may exist in the next few years with passage of the 2007 Farm Bill, and through opportunities made available through Oklahoma’s new Bio-energy Center. A review of potential alternatives to Pawnee Nation’s current electricity supply scenario revealed that a range of options could be viable. These include the following scenarios: business as usual, alternative supply, negotiate lower rates with City of Pawnee, focus on reducing energy usage, develop electric utility organization. Under any circumstances, Pawnee Nation should purse strategies to reduce energy usage, as this is the simplest means of reducing electric costs and environmental impacts. The research team also recommends that Pawnee Nation initiate some focused discussions with the City of Pawnee, with GRDA, and with IEC to discuss its wholesale supply purchase options. These discussions will better inform the Pawnee Energy Team of the specific pros and cons of its wholesale power supply options, and will assist the Team’s broader decision-making on utility-related issues. The ultimate path chosen by Pawnee Nation will depend on further consideration of priorities and potential barriers by Pawnee Nation’s Energy Team.

  17. Options Study - Phase II

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2010-09-01T23:59:59.000Z

    The Options Study has been conducted for the purpose of evaluating the potential of alternative integrated nuclear fuel cycle options to favorably address the issues associated with a continuing or expanding use of nuclear power in the United States. The study produced information that can be used to inform decisions identifying potential directions for research and development on such fuel cycle options. An integrated nuclear fuel cycle option is defined in this study as including all aspects of the entire nuclear fuel cycle, from obtaining natural resources for fuel to the ultimate disposal of used nuclear fuel (UNF) or radioactive wastes. Issues such as nuclear waste management, especially the increasing inventory of used nuclear fuel, the current uncertainty about used fuel disposal, and the risk of nuclear weapons proliferation have contributed to the reluctance to expand the use of nuclear power, even though it is recognized that nuclear power is a safe and reliable method of producing electricity. In this Options Study, current, evolutionary, and revolutionary nuclear energy options were all considered, including the use of uranium and thorium, and both once-through and recycle approaches. Available information has been collected and reviewed in order to evaluate the ability of an option to clearly address the challenges associated with the current implementation and potential expansion of commercial nuclear power in the United States. This Options Study is a comprehensive consideration and review of fuel cycle and technology options, including those for disposal, and is not constrained by any limitations that may be imposed by economics, technical maturity, past policy, or speculated future conditions. This Phase II report is intended to be used in conjunction with the Phase I report, and much information in that report is not repeated here, although some information has been updated to reflect recent developments. The focus in this Options Study was to identify any nuclear fuel cycle technology or option that may result in a significant beneficial impact to the issues as compared to the current U.S. approach of once-through use of nuclear fuel in LWRs or similar reactors followed by direct disposal of UNF. This approach was taken because incremental differences may be difficult to clearly identify and justify due to the large uncertainties that can be associated with the specific causes of the issues. Phase II of this Options Study continued the review of nuclear fuel cycle options that was initiated and documented during Phase I, concentrating on reviewing and summarizing the potential of integrated nuclear fuel cycles. However, based on the reviews of previous studies and available data, it was not always possible to clearly determine sufficiently large differences between the various fuel cycle and technology options for some of the issues or evaluation measures, for example, in cases where only incremental differences with respect to the issues might be achieved regardless of the fuel cycle option or technologies being considered, or where differences were insufficient to clearly rise above the uncertainties.

  18. Nevada Transportatoion Options Study

    SciTech Connect (OSTI)

    P. GEHNER; E.M. WEAVER; L. FOSSUM

    2006-05-25T23:59:59.000Z

    This study performs a cost and schedule analysis of three Nevada Transportation options that support waste receipt at the repository. Based on the U.S. Department of Energy preference for rail transportation in Nevada (given in the Final Environmental Impact Statement), it has been assumed that a branch rail line would be constructed to support waste receipt at the repository. However, due to potential funding constraints, it is uncertain when rail will be available. The three Nevada Transportation options have been developed to meet a varying degree of requirements for transportation and to provide cost variations used in meeting the funding constraints given in the Technical Direction Letter guidelines for this study. The options include combinations of legal-weight truck, heavy-haul truck, and rail. Option 1 uses a branch rail line that would support initial waste receipt at the repository in 2010. Rail transportation would be the primary mode, supplemented by legal weight trucks. This option provides the highest level of confidence in cost and schedule, lowest public visibility, greatest public acceptability, lowest public dose, and is the recommended option for support of waste receipt. The completion of rail by 2010 will require spending approximately $800 million prior to 2010. Option 2 uses a phased rail approach to address a constrained funding scenario. To meet funding constraints, Option 2 uses a phased approach to delay high cost activities (final design and construction) until after initial waste receipt in 2010. By doing this, approximately 95 percent of the cost associated with completion of a branch rail line is deferred until after 2010. To support waste receipt until a branch rail line is constructed in Nevada, additional legal-weight truck shipments and heavy-haul truck shipments (on a limited basis for naval spent nuclear fuel) would be used to meet the same initial waste receipt rates as in Option 1. Use of heavy-haul shipments in the absence of rail is restricted to approximately twelve, without upgrading public highways. There is high uncertainty as to what road upgrades and security/escorts the Nevada Department of Transportation would require to obtain an overweight/overdimensional permit. In addition, the Naval Nuclear Propulsion Program has indicated that a larger cask weight than that analyzed in the Final Environmental Impact Statement may be required for naval shipments, resulting in additional costs for heavy-haul transport. These uncertainties result in a high cost and schedule risk. Option 3 assumes that the start of rail construction will be delayed until after construction authorization is received from the Nuclear Regulatory Commission. Similar to Option 2, Option 3 uses legal-weight truck shipments and limited heavy haul truck shipments to meet the same initial waste receipt rates as Option 1, until rail becomes available. By using heavy-haul truck for two years, Option 3 contains the same uncertainties and resultant high cost and schedule risk as Option 2. The cost and schedule of legal-weight truck transport are not included in this report as that will be evaluated in the report on national transportation.

  19. Lactation Room Locations Building Location Room Details Contact Name Contact Info Instructions

    E-Print Network [OSTI]

    Jiang, Huiqiang

    , hot water heater, educational info Natalie Blais narnold@pitt.edu Contact Natalie to receive and request a key to this locked room. Public Health A712 Crabtree Hall table, chairs, storage cabinet, fridge

  20. A two-method solution to the investment timing option

    E-Print Network [OSTI]

    Laughton, David G.

    1990-01-01T23:59:59.000Z

    Within the realm of derivative asset valuation, two types of methods are available for solving the investment timing option, each with a serious limitation for practical projects. Methods that use Monte Carlo simulation ...

  1. Real options approach to capacity planning under uncertainty

    E-Print Network [OSTI]

    Mittal, Geetanjali, 1979-

    2004-01-01T23:59:59.000Z

    This thesis highlights the effectiveness of Real Options Analysis (ROA) in capacity planning decisions for engineering projects subject to uncertainty. This is in contrast to the irreversible decision-making proposed by ...

  2. Natural Gas Utilities Options Analysis for the Hydrogen Economy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    > Natural Gas Utilities Options Analysis for the Hydrogen Economy Hydrogen Pipeline R&D Project Review Meeting 6 January 2005 Oak Ridge National Laboratory Oak Ridge, TN Mark E....

  3. Edit Test Options Page 1 Edit Test Options

    E-Print Network [OSTI]

    Xu, Shouhuai

    Edit Test Options Page 1 Edit Test Options Format Test Information 1. Enter a Name for the Test. 2. Choose a color for the title text of the Test. (Optional) 3. Enter a Description in the Text Box. The description is visible to Students before they click on the link to take the Test. (Optional) 4. If you want

  4. Thermal test options

    SciTech Connect (OSTI)

    Koski, J.A.; Keltner, N.R.; Sobolik, K.B.

    1993-02-01T23:59:59.000Z

    Shipping containers for radioactive materials must be qualified to meet a thermal accident environment specified in regulations, such at Title 10, Code of Federal Regulations, Part 71. Aimed primarily at the shipping container design, this report discusses the thermal testing options available for meeting the regulatory requirements, and states the advantages and disadvantages of each approach. The principal options considered are testing with radiant heat, furnaces, and open pool fires. The report also identifies some of the facilities available and current contacts. Finally, the report makes some recommendations on the appropriate use of these different testing methods.

  5. Lighting Options for Homes.

    SciTech Connect (OSTI)

    Baker, W.S.

    1991-04-01T23:59:59.000Z

    This report covers many aspects of various lighting options for homes. Types of light sources described include natural light, artificial light, incandescent lamps, fluorescent lamps, and high intensity discharge lamps. A light source selection guide gives the physical characteristics of these, design considerations, and common applications. Color, strategies for efficient lighting, and types of lighting are discussed. There is one section giving tips for various situations in specific rooms. Rooms and types of fixtures are shown on a matrix with watts saved by using the recommended type lighting for that room and room location. A major emphasis of this report is saving energy by utilizing the most suitable, recommended lighting option. (BN)

  6. Economics & Finance Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    98 Economics & Finance Degree options MA or BSc (Single Honours Degrees) Applied Economics Economics Financial Economics BA (International Honours Degree) Economics (See page 51) MA or BSc (Joint Honours Degrees) Economics and one of: Geography Management Mathematics MA (Joint Honours Degrees

  7. Sustainable Office Lighting Options

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Sustainable Office Lighting Options Task Lighting: Task lighting is a localized method of lighting a workspace so that additional, unnecessary lighting is eliminated, decreasing energy usage and costs. Illumination levels in the targeted work areas are higher with task lighting than with the ambient levels

  8. Computer Science Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    82 Computer Science Degree options BSc (Single Honours Degree) Computer Science BSc (Joint Honours Degrees) Computer Science and one of: Economics Logic and Philosophy of Science Management Management Science MSci (Single Honours Degree) Computer Science Entrance Requirements (see also pages 164 - 205

  9. Fuels options conference

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The proceedings of the Fuels Options Conference held May 9-10, 1995 in Atlanta, Georgia are presented. Twenty-three papers were presented at the conference that dealt with fuels outlook; unconventional fuels; fuel specification, purchasing, and contracting; and waste fuels applications. A separate abstract was prepared for each paper for inclusion in the Energy Science and Technology Database.

  10. Idaho's Energy Options

    SciTech Connect (OSTI)

    Robert M. Neilson

    2006-03-01T23:59:59.000Z

    This report, developed by the Idaho National Laboratory, is provided as an introduction to and an update of the status of technologies for the generation and use of energy. Its purpose is to provide information useful for identifying and evaluating Idaho’s energy options, and for developing and implementing Idaho’s energy direction and policies.

  11. OVERVIEW OF CONTRACTING OPTIONS

    E-Print Network [OSTI]

    Waliser, Duane E.

    OVERVIEW OF CONTRACTING OPTIONS Presented by Bill McNally July 24, 2012 #12;National Aeronautics and Space Administration Selecting the Right Contract Type · Objective ­ Negotiate a contract type and price a Contract Type · What are your acquisition's objectives? ­ New program? ­ Existing program? (Historical

  12. Factors Affecting Option Premium Values

    E-Print Network [OSTI]

    Johnson, Jason; Smith, Jackie; Dhuyvetter, Kevin C.; Waller, Mark L.

    1999-06-23T23:59:59.000Z

    prices or buyers against ris- ing prices. A put option allows producers to establish a price floor or minimum selling price. With a put the producer can benefit from a price rally. The buyer of a put option pays an option premium but does not have... to establish a margin account. For this premium, the put option buyer has the right, but not the obliga- tion, to sell a futures contract at a predetermined price known as the ?strike? price. Call Options Call options protect buyers from rising prices...

  13. Convergence Speed of GARCH Option Price to Diffusion Option Price

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Convergence Speed of GARCH Option Price to Diffusion Option Price Jin-Chuan Duan, Yazhen Wang that as the time interval between two consecutive observations shrinks to zero, a properly constructed GARCH model will weakly converge to a bivariate diffusion. Naturally the European option price under the GARCH model

  14. Convergence Speed of GARCH Option Price to Diffusion Option Price

    E-Print Network [OSTI]

    Wang, Yazhen

    Convergence Speed of GARCH Option Price to Diffusion Option Price Jin-Chuan Duan National constructed GARCH model will weakly converge to a bi- variate diffusion. Naturally the European option price under the GARCH model will also converge to its bivariate diffusion counterpart. This paper investigates

  15. Hedging With a Put Option

    E-Print Network [OSTI]

    Anderson, Carl; Smith, Jackie; McCorkle, Dean; O'Brien, Daniel

    1999-06-23T23:59:59.000Z

    , corn options delivery months are December, March, May, July and September. Cotton delivery months are December, March, May, July, and October. Strike Price A put option is tied to a predetermined price level, in the underlying delivery month, at which...

  16. Milk Futures, Options and Basis

    E-Print Network [OSTI]

    Haigh, Michael; Stockton, Matthew; Anderson, David P.; Schwart Jr., Robert B.

    2001-10-12T23:59:59.000Z

    The milk futures and options market enables producers and processors to manage price risk. This publication explains hedging, margin accounts, basis and how to track it, and other fundamentals of the futures and options market....

  17. The Window Strategy with Options

    E-Print Network [OSTI]

    McCorkle, Dean; Amosson, Stephen H.; Fausett, Marvin

    1999-06-23T23:59:59.000Z

    The window strategy is one of several marketing strategies using futures and options to establish a floor price and allow for upside price potential. It also reduces option premium costs. This publication discusses how the window strategy works...

  18. The safeguards options study

    SciTech Connect (OSTI)

    Hakkila, E.A.; Mullen, M.F.; Olinger, C.T.; Stanbro, W.D. [Los Alamos National Lab., NM (United States); Olsen, A.P.; Roche, C.T.; Rudolph, R.R. [Argonne National Lab., IL (United States); Bieber, A.M.; Lemley, J. [Brookhaven National Lab., Upton, NY (United States); Filby, E. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-04-01T23:59:59.000Z

    The Safeguards Options Study was initiated to aid the International Safeguards Division (ISD) of the DOE Office of Arms Control and Nonproliferation in developing its programs in enhanced international safeguards. The goal was to provide a technical basis for the ISD program in this area. The Safeguards Options Study has been a cooperative effort among ten organizations. These are Argonne National Laboratory, Brookhaven National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, Mound Laboratory, Oak Ridge National Laboratory, Pacific Northwest Laboratories, Sandia National Laboratories, and Special Technologies Laboratory. Much of the Motivation for the Safeguards Options Study is the recognition after the Iraq experience that there are deficiencies in the present approach to international safeguards. While under International Atomic Energy Agency (IAEA) safeguards at their declared facilities, Iraq was able to develop a significant weapons program without being noticed. This is because negotiated safeguards only applied at declared sites. Even so, their nuclear weapons program clearly conflicted with Iraq`s obligations under the Nuclear Nonproliferation Treaty (NPT) as a nonnuclear weapon state.

  19. Analysis of Green Energy Options for The Phipps Conservatory

    E-Print Network [OSTI]

    Attari, Shahzeen Z.

    power and thermal energy via on-site generation or purchases of renewable energy credits: 1) A 5kW solid1 Analysis of Green Energy Options for The Phipps Conservatory Shahzeen Attari Elisabeth Gilmore or educational projects may make them worth the additional expense. Qualitative relative rankings of the project

  20. Design options for clothes washers

    SciTech Connect (OSTI)

    Biermayer, Peter J.

    1996-10-01T23:59:59.000Z

    This report discusses possible design options for improving the energy efficiency of standard capacity, residential clothes washers.

  1. Venture Capitalists' Decision to Withdraw: The Role of Portfolio Configuration From a Real Options Lens

    E-Print Network [OSTI]

    Li, Yong; Chi, Tailan

    2012-01-01T23:59:59.000Z

    When does a venture capital firm withdraw from an investment project prior to its completion? This study offers a real options view on this decision by examining the contingent effects of portfolio configuration. We explore how project withdrawal...

  2. A Laboratory Investigation of Deferral Options

    E-Print Network [OSTI]

    Oprea, Ryan; Friedman, Daniel; Anderson, Steven T

    2007-01-01T23:59:59.000Z

    T. and Antikarov, V. , 2003, “Real Options: A Practitioner’ssteady state. Keywords: Real options, optimal stopping,email Introduction Real options theory came of age in the

  3. Resources, real options, and corporate strategy

    E-Print Network [OSTI]

    Bernardo, Antonio; Chowdhry, Bhagwan

    1998-01-01T23:59:59.000Z

    211–234 Resources, real options, and corporate strategy $D83; G30; G31 Keywords: Real options; Valuation; Corporateparticipants at the Real Options Conference at Northwestern

  4. A Dialogue Concerning Two World Systems: Info-Computational vs. Mechanistic

    E-Print Network [OSTI]

    Gordana Dodig-Crnkovic; Vincent C. Mueller

    2009-10-26T23:59:59.000Z

    The dialogue develops arguments for and against adopting a new world system, info-computationalist naturalism, that is poised to replace the traditional mechanistic world system. We try to figure out what the info-computational paradigm would mean, in particular its pancomputationalism. We make some steps towards developing the notion of computing that is necessary here, especially in relation to traditional notions. We investigate whether pancomputationalism can possibly provide the basic causal structure to the world, whether the overall research programme appears productive and whether it can revigorate computationalism in the philosophy of mind.

  5. Retrieval options study

    SciTech Connect (OSTI)

    Not Available

    1980-03-01T23:59:59.000Z

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval; (same as emplacement, variably slower depending on repository/canister condition).

  6. Transition Strategies: Government Options and Market Penetration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategies: Government Options and Market Penetration Scenarios Transition Strategies: Government Options and Market Penetration Scenarios Presentation on Transition Strategies:...

  7. INFO-F-309 Administration des Systmes TP1: Installation de Linux et gestion des packages

    E-Print Network [OSTI]

    Collette. Sébastien

    INFO-F-309 ­ Administration des Systèmes TP1: Installation de Linux et gestion des packagesBox. Ensuite nous verrons comment fonctionne la gestion de packages, la mise à jour du système et l la gestion de packages. 2 Installation de Linux 2.1 Préparation Surtout lorsqu'il s'agit d'un serveur

  8. Company City State Contact Info Acacia Research Corporation Newport Beach CA www.acaciaresearch.com

    E-Print Network [OSTI]

    McGaughey, Alan

    Company City State Contact Info Acacia Research Corporation Newport Beach CA www. Fountain City CA www.kingston.com Microchip Technology Incorporated Chandler AZ www Milpitas CA www.sandisk.com Silicon Storage Technology, Inc. Sunnyvale CA www.sst.com SMART Modular

  9. Biodiversity, Entropy and Thermodynamics http://math.ucr.edu/home/baez/bio info/

    E-Print Network [OSTI]

    Baez, John

    Biodiversity, Entropy and Thermodynamics John Baez http://math.ucr.edu/home/baez/bio info/ October(pi ) is fundamental to thermodynamics and information theory. But it's also used to measure biodiversity, where pi. In biodiversity studies, the entropy of an ecosystem is the expected amount of information we gain about

  10. Local Option- Property Tax Exemption

    Broader source: Energy.gov [DOE]

    Vermont allows municipalities the option of offering an exemption from the municipal real and personal property taxes for certain renewable energy systems (Note: state property taxes would still...

  11. Sustainable Energy: Choosing Among Options

    E-Print Network [OSTI]

    Mirza, Umar Karim

    2006-01-01T23:59:59.000Z

    Review: Sustainable Energy: Choosing Among Options Byand William A. Peters. Sustainable Energy: Choosing AmongAll the authors of Sustainable Energy are associated with

  12. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    In Montana, regulated electric utilities are required to offer customers the option of purchasing electricity generated by certified, environmentally-preferred resources that include, but are not...

  13. Rural Health Option The Rural Health Option requires

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Rural Health Option The Rural Health Option requires: Membership in StORM Club, the Students include up to 3 sites/3physician-mentors Enrollment into BOTH rural health electives for a total of 2.sumner@okstate.edu) o Spring: Perspectives in Rural Health for OMSI or OMSII (or OMSIII with special permission) CLME

  14. Solid Target Options S. Childress

    E-Print Network [OSTI]

    McDonald, Kirk

    power is higher than for existing solid target designs - but not by a large factor. · NuMI graphite beam power) · High beam power solid targets frequently use higher z materials for increased yield plusSolid Target Options NuFACT'00 S. Childress Solid Target Options · The choice of a primary beam

  15. AFCI Options Study

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2009-09-01T23:59:59.000Z

    This report describes the background and framework for both organizing the discussion and providing information on the potential for nuclear energy R&D to develop alternative nuclear fuel cycles that would address the issues with the current implementations of nuclear power, including nuclear waste disposal, proliferation risk, safety, security, economics, and sustainability. The disposition of used fuel is the cause of many of the concerns, and the possible approaches to used fuel management identify a number of basic technology areas that need to be considered. The basic science in each of the technology areas is discussed, emphasizing what science is currently available, where scientific knowledge may be insufficient, and especially to identify specific areas where transformational discoveries may allow achievement of performance goals not currently attainable. These discussions lead to the wide range of technical options that have been the basis for past and current research and development on advanced nuclear fuel cycles in the United States. The results of this work are then briefly reviewed to show the extent to which such approaches are capable of addressing the issues with nuclear power, the potential for moving further, and the inherent limitations.

  16. SJSU Information Support Services Run a Query info-support@sjsu.edu, 408-924-1530 Page 1

    E-Print Network [OSTI]

    Su, Xiao

    ....................................................................................................................................................................3 Advanced Search Run a Query info-support@sjsu.edu, 408-924-1530 Page 4 Advanced Search 4. To do an advanced search, click the Advanced Search link. The Advanced Search parameters display. Notes: The other most commonly

  17. Advanced Nuclear Fuel Cycle Options

    SciTech Connect (OSTI)

    Roald Wigeland; Temitope Taiwo; Michael Todosow; William Halsey; Jess Gehin

    2010-06-01T23:59:59.000Z

    A systematic evaluation has been conducted of the potential for advanced nuclear fuel cycle strategies and options to address the issues ascribed to the use of nuclear power. Issues included nuclear waste management, proliferation risk, safety, security, economics and affordability, and sustainability. The two basic strategies, once-through and recycle, and the range of possibilities within each strategy, are considered for all aspects of the fuel cycle including options for nuclear material irradiation, separations if needed, and disposal. Options range from incremental changes to today’s implementation to revolutionary concepts that would require the development of advanced nuclear technologies.

  18. JBuilder Startup Instructions Creating a Project

    E-Print Network [OSTI]

    Liang, Y. Daniel

    the Generate project notes file option box. Click Next to display Project Wizard Step 2 of 3. 3. Type cJBuilder Startup Instructions Creating a Project 1. Choose File, New Project to bring up will see the No Such Directory dialog box. Click Yes to return to Project Wizard - Step 2 of 3. 4. Click

  19. POULTRY PROJECT Reprinted November 2005

    E-Print Network [OSTI]

    Tullos, Desiree

    POULTRY PROJECT $3.00 4-H 150 Reprinted November 2005 4-H Member Guide #12;2 Contents 3 Which Came First? 4 Poultry Production Option 5 Poultry Science Option 8 Health Program 13 Brooding 14 Member prepared by Charles Fischer, Extension poultry specialist emeritus; Ken Hollemann, former Extension poultry

  20. A real options approach to criminal careers

    E-Print Network [OSTI]

    Aguiar de Oliveira, Cristiano

    2012-01-01T23:59:59.000Z

    J. (2004) Criminal behavior: A real option approach with anTrigeorgis, L. (1996) Real Options. Cambridge: MIT Press.A real options approach to criminal careers Cristiano Aguiar

  1. Patents and R& D as Real Options

    E-Print Network [OSTI]

    Schwartz, Eduardo S.

    2002-01-01T23:59:59.000Z

    Information Technology as Real Options, UCLA Working Paper.Patents and R&D as Real Options* September 2001 RevisedPatents and R&D as Real Options Abstract This article

  2. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    All electric utilities operating in Iowa, including those not rate-regulated by the Iowa Utilities Board (IUB), are required to offer green power options to their customers. These programs allow...

  3. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    Legislation enacted in 2009 directed the Maine Public Utilities Commission (PUC) to develop a program offering green power as an option to residential and small commercial customers in the state....

  4. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    In May 2001, Washington enacted legislation (EHB 2247) that requires all electric utilities serving more than 25,000 customers to offer customers the option of purchasing renewable energy. Eligible...

  5. Hydrogen Delivery Infrastructure Options Analysis

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report, by the Nexant team, documents an in-depth analysis of seven hydrogen delivery options to identify the most cost-effective hydrogen infrastructure for the transition and long term. The pro

  6. INTEGRATIVE BIOSCIENCES (IBIOS) GRADUATE PROGRAM OPTION

    E-Print Network [OSTI]

    dePamphilis, Claude

    INTEGRATIVE BIOSCIENCES (IBIOS) GRADUATE PROGRAM OPTION IN Bioinformatics and Genomics (BG) Degree-Faculty Relation----------------------------------------------------------------- 8 Bioinformatics and Genomics--------------------------------------------------------------------------------------------------17 #12;- -3 Bioinformatics and Genomics Option (BG

  7. Hydrogen Delivery Infrastructure Analysis, Options and Trade...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis, Options and Trade-offs, Transition and Long-term Hydrogen Delivery Infrastructure Analysis, Options and Trade-offs, Transition and Long-term Presentation on Hydrogen...

  8. Final Report - Hydrogen Delivery Infrastructure Options Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Hydrogen Delivery Infrastructure Options Analysis Final Report - Hydrogen Delivery Infrastructure Options Analysis This report, by the Nexant team, documents an in-depth analysis...

  9. Final Report - Hydrogen Delivery Infrastructure Options Analysis

    Broader source: Energy.gov (indexed) [DOE]

    pipelines for gaseous hydrogen delivery Option 2: Use of existing natural gas or oil pipelines for gaseous hydrogen delivery Option 3: Use of existing natural gas pipelines...

  10. Evaluation of large scale industrial development using real options analysis : a case study

    E-Print Network [OSTI]

    Ariizumi, Tatsuyuki

    2006-01-01T23:59:59.000Z

    Recently, real-option analysis has gained attention as an innovative valuation method for complex real estate projects. However, considering its potential, this method has not become as popular as it should have. One major ...

  11. Real option analysis as a decision tool in oil field developments

    E-Print Network [OSTI]

    Babajide, Abisoye (Abisoye E.)

    2007-01-01T23:59:59.000Z

    This thesis shows the applicability and value of real options analysis in developing an oil field, and how its use along with decision analysis can maximize the returns on a given project and minimize the losses. It focuses ...

  12. A real options case study : The valuation of flexibility in the World Trade Center redevelopment

    E-Print Network [OSTI]

    Cailao, Alberto P

    2009-01-01T23:59:59.000Z

    This thesis will apply the past research and methodologies of Real Options to Tower 2 and Tower 3 of the World Trade Center redevelopment project in New York, NY. The qualitative component of the thesis investigates the ...

  13. Evaluation of Industrial Energy Options for Cogeneration, Waste Heat Recovery and Alternative Fuel Utilization

    E-Print Network [OSTI]

    Hencey, S.; Hinkle, B.; Limaye, D. R.

    1980-01-01T23:59:59.000Z

    This paper describes the energy options available to Missouri industrial firms in the areas of cogeneration, waste heat recovery, and coal and alternative fuel utilization. The project, being performed by Synergic Resources Corporation...

  14. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.

  15. Sustainable Energy: Choosing Among Options

    E-Print Network [OSTI]

    Mirza, Umar Karim

    2006-01-01T23:59:59.000Z

    today, their economic evaluation and the technologies toare discussed. Economic evaluation of energy projects is

  16. Development of stripper options for FRIB

    SciTech Connect (OSTI)

    Marti, F.; Hershcovitch, A.; Momozaki, Y.; Nolen, J.; Reed, C.; Thieberger, P.

    2010-09-12T23:59:59.000Z

    The US Department of Energy Facility for Rare Isotope Beams (FRIB) at Michigan State University includes a heavy ion superconducting linac capable of accelerating all ions up to uranium with energies higher than 200 MeV/u and beam power up to 400 kW. To achieve these goals with present ion source performance it is necessary to accelerate simultaneously two charge states of uranium from the ion source in the first section of the linac. At an energy of approximately 16.5 MeV/u it is planned to strip the uranium beam to reduce the voltage needed in the rest of the linac to achieve the final energy. Up to five different charge states are planned to be accelerated simultaneously after the stripper. The design of the stripper is a challenging problem due to the high power deposited (approximately 0.7 kW) in the stripper media by the beam in a small spot. To assure success of the project we have established a research and development program that includes several options: carbon or diamond foils, liquid lithium films, gas strippers and plasma strippers. We present in this paper the status of the different options.

  17. Design Evolution Study - Aging Options

    SciTech Connect (OSTI)

    P. McDaniel

    2002-04-05T23:59:59.000Z

    The purpose of this study is to identify options and issues for aging commercial spent nuclear fuel received for disposal at the Yucca Mountain Mined Geologic Repository. Some early shipments of commercial spent nuclear fuel to the repository may be received with high-heat-output (younger) fuel assemblies that will need to be managed to meet thermal goals for emplacement. The capability to age as much as 40,000 metric tons of heavy metal of commercial spent nuclear he1 would provide more flexibility in the design to manage this younger fuel and to decouple waste receipt and waste emplacement. The following potential aging location options are evaluated: (1) Surface aging at four locations near the North Portal; (2) Subsurface aging in the permanent emplacement drifts; and (3) Subsurface aging in a new subsurface area. The following aging container options are evaluated: (1) Complete Waste Package; (2) Stainless Steel inner liner of the waste package; (3) Dual Purpose Canisters; (4) Multi-Purpose Canisters; and (5) New disposable canister for uncanistered commercial spent nuclear fuel. Each option is compared to a ''Base Case,'' which is the expected normal waste packaging process without aging. A Value Engineering approach is used to score each option against nine technical criteria and rank the options. Open issues with each of the options and suggested future actions are also presented. Costs for aging containers and aging locations are evaluated separately. Capital costs are developed for direct costs and distributable field costs. To the extent practical, unit costs are presented. Indirect costs, operating costs, and total system life cycle costs will be evaluated outside of this study. Three recommendations for aging commercial spent nuclear fuel--subsurface, surface, and combined surface and subsurface are presented for further review in the overall design re-evaluation effort. Options that were evaluated but not recommended are: subsurface aging in a new subsurface area (high cost); surface aging in the complete waste package (risk to the waste package and impact on the Waste Handling Facility); and aging in the stainless steel liner (impact on the waste package design and new high risk operations added to the waste packaging process). The selection of a design basis for aging will be made in conjunction with the other design re-evaluation studies.

  18. Contact Info

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group andCompositionalInitial Validation andPWRContaCt

  19. Forecourt Storage and Compression Options

    E-Print Network [OSTI]

    capital costs and maximize utilization NATURAL GAS & HYDROGEN FUELING STATION SIZING SOFTWARE Developed 510 520 530 540 Minutes Bank1 Bank2 Bank3 Cascade Banks Pressure Vs.Time (Hydrogen) #12;16 Compressor> Forecourt Storage and Compression Options DOE and FreedomCAR & Fuel Partnership Hydrogen Delivery

  20. COMMUNITY CHOICE AGGREGATION PILOT PROJECT

    E-Print Network [OSTI]

    GOVERNMENT AFFAIRS REPRESENTATIVE]; Under SDG&E's tariff Schedule CCA-INFO, a local government considering under tariff Schedule CCA-INFO, section SPECIAL CONDITIONS, subsection 7, Confidential Information

  1. Depleted uranium disposal options evaluation

    SciTech Connect (OSTI)

    Hertzler, T.J.; Nishimoto, D.D.; Otis, M.D. [Science Applications International Corp., Idaho Falls, ID (United States). Waste Management Technology Div.

    1994-05-01T23:59:59.000Z

    The Department of Energy (DOE), Office of Environmental Restoration and Waste Management, has chartered a study to evaluate alternative management strategies for depleted uranium (DU) currently stored throughout the DOE complex. Historically, DU has been maintained as a strategic resource because of uses for DU metal and potential uses for further enrichment or for uranium oxide as breeder reactor blanket fuel. This study has focused on evaluating the disposal options for DU if it were considered a waste. This report is in no way declaring these DU reserves a ``waste,`` but is intended to provide baseline data for comparison with other management options for use of DU. To PICS considered in this report include: Retrievable disposal; permanent disposal; health hazards; radiation toxicity and chemical toxicity.

  2. Fuel option for gas turbine

    SciTech Connect (OSTI)

    Tantayakom, S. [Electricity Generating Authority of Thailand, Nonthaburi (Thailand). Chemical and Analysis Dept.

    1995-12-31T23:59:59.000Z

    Growth in electricity demand is an average of 10% per year. Energy, emission, and economy are importance of critical concerns for generating systems. Therefore, combined cycle power plant is preferred to Electricity Generating Authority of Thailand (EGAT) new power generating capacity. The various option of available fuel for gas turbine are natural gas, liquid fuel and coal fuel. Particularly with the tremendous price increases in imported and domestic fuel supplies, natural gas is an attractive low cost alternative for power generation. EGAT has researched using heavy fuel instead of natural gas since the year 1991. The problems of various corrosion characteristics have been found. In addition, fuel treatment for gas turbine are needed, and along with it, the environmental consideration are options that provide the limitation of environmental regulation.

  3. Early Exercise Option Valuation 00000001111111

    E-Print Network [OSTI]

    Oosterlee, Cornelis W. "Kees"

    Early Exercise Option Valuation 0 0 1 1 00000001111111 s T 0 0s K Mm+1m t 0 With V (tM , S(tM)) = E. Computational Finance (Summerschool) Hitotsubashi University August 2009 2 / 51 #12;The CONV method (Carr-Madan extended) The main premise of the CONV method is that f (y|x) depends on x and y via f (y|x) = f (y - x

  4. The new option view of investment

    E-Print Network [OSTI]

    Dixit, Avinash K.

    1995-01-01T23:59:59.000Z

    This paper provides a simple introduction to the new option view of investment. We explain the shortcomings of the orthodox theory, and then outline the basic ideas behind the option framework. Several industry examples ...

  5. Honors College Senior Project What is the Honors College Senior Project?

    E-Print Network [OSTI]

    Huang, Haiying

    Honors College Senior Project Overview What is the Honors College Senior Project? Individual departments have different expectations for completing the Honors Senior Project; thus, depending on your major, there are up to five options available to you. The unifying thread for all Honors Senior Projects

  6. Overview of Options to Integrate Stationary Power Generation from Fuel Cells with

    E-Print Network [OSTI]

    ;3 Alternate Fuel Infrastructure Lessons Learned Project ·Project with NREL ·Workshop held in April 2008 Municipalities and Local government agencies Fire and Rescue facilities Policy stations Data centers Universities1 Overview of Options to Integrate Stationary Power Generation from Fuel Cells with Hydrogen Demand

  7. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

  8. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

  9. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    -year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

  10. Hotel Info in Los Alamos There are many wonderful places to stay in Santa Fe as well as the surrounding

    E-Print Network [OSTI]

    Alamos, NM 87544 505-672-3838 Holiday Inn Express at Entrada Park 60 Entrada Dr. Los Alamos, NM 87544 505Hotel Info in Los Alamos There are many wonderful places to stay in Santa Fe as well as the surrounding areas but the following is a list of hotels in Los Alamos: Adobe Pines Bed & Breakfast 2101 Loma

  11. Company City State Contact Info 21st Century Plastics Corporation Potterville MI www.21stcpc.com

    E-Print Network [OSTI]

    McGaughey, Alan

    Company City State Contact Info 21st Century Plastics Corporation Potterville MI www.21stcpc.com A. Schulman, Inc. Akron OH www.aschulman.com A.M.A. Plastics Riverside CA www.accordindustries.com Airlite Plastics Co. Omaha NE www.airliteplastics.com Alco Plastics, Inc. Romeo MI www

  12. Project Earth Lover

    SciTech Connect (OSTI)

    Slobotski, Stephanie,

    2011-09-01T23:59:59.000Z

    Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

  13. Numerical Valuation of Discrete Barrier Options with

    E-Print Network [OSTI]

    Chu, Hao-hua

    Numerical Valuation of Discrete Barrier Options with the Adaptive Mesh Model and Other Competing for discrete barrier options such that many methods have been suggested and declared to price discrete barrier options fast and accurately but no one can tell exactly that what method is the best. We also make

  14. Pemex: Problems and Policy Options

    E-Print Network [OSTI]

    Shields, David

    2006-01-01T23:59:59.000Z

    has also promoted liquefied natural gas (LNG) projects. Thepromoted and tendered two LNG regasification terminals, oneinvestments would include an LNG regasification plant to

  15. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    for California Solar Initiative.34under Step 5 of the California Solar Initiative incentiveto the next step in the California Solar Initiative (i.e. ,

  16. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    23 4.4 Service Contract (24 4.5 Pre-Paid Service Contract (the full report). • Service Contract (Partnership): The site

  17. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    of State Incentives for Renewable Energy (DSIRE). 2008.based incentives – CBIs or PBIs) and/or renewable energyRenewable Energy Bonds (CREBs) . 7 2.2 State and Local Policy Support for PV Deployment .. 8 2.2.1 Net Metering .. 8 2.2.2 Cash Incentives .

  18. Automatic Deployment Options Projection Tool (ADOPT) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWendeGuo Feng Bio Jump to: navigation, search

  19. Solar Schools Assessment and Implementation Project: Financing Options on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScoping Study |4 SolarPV IncentiveSolar Installations

  20. Small Business Financing Options for Clean Energy Projects | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of Energy U.S. DepartmentCommitmentGovernment Purchase Card

  1. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

  2. Valuation of Information Technology Investments as Real Options

    E-Print Network [OSTI]

    Schwartz, Eduardo S.; Zozaya-Gorostiza, Carlos

    2000-01-01T23:59:59.000Z

    1999) A Case for Using Real Options Pricing Analysis toExpansion Using Real Options Analysis. MIS Quarterly. Vol.Investment Opportunities as Real Options: Getting Started on

  3. GARCH Option Pricinga Options can be priced when the underlying asset's

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    GARCH Option Pricinga · Options can be priced when the underlying asset's return follows a GARCH for any elapsed time t. aA Bloomberg quant said, on Feb 29, 2008, that GARCH option pricing is seldom used in trading. c 2008 Prof. Yuh-Dauh Lyuu, National Taiwan University Page 686 #12;GARCH Option Pricing

  4. Hydrogen Delivery InfrastructureHydrogen Delivery Infrastructure Option AnalysisOption Analysis

    E-Print Network [OSTI]

    Converting NG/oil pipelines for GH delivery Option 3 Blending GH into NG pipelines Option 4* GH tube trailers Option 5* LH tank trucks Option 6 Use of novel H2 carriers (alanate; chemical hydride; liquid hydrocarbon as CA) -- NG distribution lines: gas companies usually use for Class 3 & 4 No odorants used in current H

  5. VAMOS: The verification and monitoring options study: Current research options for in-situ monitoring and verification of contaminant remediation and containment within the vadose zone

    SciTech Connect (OSTI)

    Betsill, J.D. [Sandia National Labs., Albuquerque, NM (United States); Gruebel, R.D. [Tech Reps., Inc., Albuquerque, NM (United States)

    1995-09-01T23:59:59.000Z

    The Verification and Monitoring Options Study Project (VAMOS) was established to identify high-priority options for future vadose-zone environmental research in the areas of in-situ remediation monitoring, post-closure monitoring, and containment emplacement and verification monitoring. VAMOS examined projected needs not currently being met with applied technology in order to develop viable monitoring and verification research options. The study emphasized a compatible systems approach to reinforce the need for utilizing compatible components to provide user friendly site monitoring systems. To identify the needs and research options related to vadose-zone environmental monitoring and verification, a literature search and expert panel forums were conducted. The search included present drivers for environmental monitoring technology, technology applications, and research efforts. The forums included scientific, academic, industry, and regulatory environmental professionals as well as end users of environmental technology. The experts evaluated current and future monitoring and verification needs, methods for meeting these needs, and viable research options and directions. A variety of high-priority technology development, user facility, and technology guidance research options were developed and presented as an outcome of the literature search and expert panel forums.

  6. FIRE Project Action Plan in Response to

    E-Print Network [OSTI]

    . The project should review other mission statements from the Office of Science in order to understand better, the Next Generation Space Telescope, etc. The project will also solicit input from the science community1 FIRE Project Action Plan in Response to Next Step Options Program Advisory Committee Report (PAC1

  7. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

  8. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

  9. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    , there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

  10. Exit Options and Dividend Policy under Liquidity Constraints

    E-Print Network [OSTI]

    Murto, Pauli; Terviö, Marko

    2009-01-01T23:59:59.000Z

    optimal exercise of real options. Boyle and Guthrie (2003)described by the standard real option model of optimal exit.

  11. SENIOR PROJECT PROPOSAL FORM Attach this completed form to your Honors Senior Proposal

    E-Print Network [OSTI]

    Huang, Haiying

    SENIOR PROJECT PROPOSAL FORM Attach this completed form to your Honors Senior Proposal I. PERSONAL#:________________________________ Anticipated Graduation Date: _____________________________ Date Submitted: ___________________________ Major: __________________________________ II. PROJECT INFORMATION Type of Project: Consult the departmental options informational sheet

  12. Reconciling Real Option Models: An Approach to Incorporate Market and Private Uncertainties

    E-Print Network [OSTI]

    Kelsey Barton; Yuri Lawryshyn

    Several real options analysis techniques designed for practitioners exist in literature, but there is discrepancy in their underlying assumptions, mechanics and applicability. Within this paper, a review of approaches targeted towards practitioners is included, and a novel way of integrating market and private uncertainties is proposed. Market risk is incorporated into the dynamics of the project cash flow by assuming the success of the project is correlated to a traded index. The value of the real option on the project cash flows may be priced by traditional numerical methods or a simulation approach similar to the previously recommended Datar-Mathews method (Datar et al., 2007). A numerical example presents the proposed model within the simulation framework. Keywords: Real options for practitioners, valuation under uncertainty, DM Method, correlated processes 1

  13. Economics of Alaska North Slope gas utilization options

    SciTech Connect (OSTI)

    Thomas, C.P.; Doughty, T.C.; Hackworth, J.H.; North, W.B.; Robertson, E.P.

    1996-08-01T23:59:59.000Z

    The recoverable natural gas available for sale in the developed and known undeveloped fields on the Alaskan North Slope (ANS) total about 26 trillion cubic feet (TCF), including 22 TCF in the Prudhoe Bay Unit (PBU) and 3 TCF in the undeveloped Point Thomson Unit (PTU). No significant commercial use has been made of this large natural gas resource because there are no facilities in place to transport this gas to current markets. To date the economics have not been favorable to support development of a gas transportation system. However, with the declining trend in ANS oil production, interest in development of this huge gas resource is rising, making it important for the U.S. Department of Energy, industry, and the State of Alaska to evaluate and assess the options for development of this vast gas resource. The purpose of this study was to assess whether gas-to-liquids (GTL) conversion technology would be an economic alternative for the development and sale of the large, remote, and currently unmarketable ANS natural gas resource, and to compare the long term economic impact of a GTL conversion option to that of the more frequently discussed natural gas pipeline/liquefied natural gas (LNG) option. The major components of the study are: an assessment of the ANS oil and gas resources; an analysis of conversion and transportation options; a review of natural gas, LNG, and selected oil product markets; and an economic analysis of the LNG and GTL gas sales options based on publicly available input needed for assumptions of the economic variables. Uncertainties in assumptions are evaluated by determining the sensitivity of project economics to changes in baseline economic variables.

  14. DOE outlines complex cleanup options

    SciTech Connect (OSTI)

    Lobsenz, G.

    1994-02-25T23:59:59.000Z

    The Energy Department said last week it will consider four different strategies for cleanup of its nuclear weapons complex in a draft programmatic environmental impact statement due for release this summer. In an implementation plan released for public comment February 17, DOE also said the EIS would look at centralized, decentralized and regional approaches to management of six types of radioactive and hazardous wastes. Other issues to be addressed in the EIS are development of innovative cleanup technology, budgeting and prioritization, job cutbacks and worker retraining, waste minimization and community involvement in cleanup decisions. However, DOE said it had decided not to address spent nuclear fuel storage in the EIS, as had been previously planned. Instead, spent fuel storage options will be reviewed in another environmental study being done under court order for DOE's Idaho National Engineering Laboratory. Findings from the INEL study will be incorporated in the department-wide EIS for environmental restoration and waste management.

  15. Optional Residential Program Benchmarking | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Data and Evaluation Peer Exchange Call Series: Optional Residential Program Benchmarking, Call Slides and Discussion Summary, January 23, 2014. Call Slides and Discussion Summary...

  16. Biochemistry, Research Option BS Degree Completion Checklist

    E-Print Network [OSTI]

    Sherrill, David

    ____ CHEM 4601 ____ Biology Electives: 9 hours 4701 _____ LCC 4702 _____ Free Electives: ____ hours petition. Note on CHEM 4698 vs. 4699 CHEM 4698 does count toward the Research Option designation

  17. SJSU Information Support Services Send Messages by Instructor info-support@sjsu.edu, 408-924-1530 Page 1

    E-Print Network [OSTI]

    Su, Xiao

    , and Expiration Date for the message. 10. Enter the Term number for the class. To select from a list of terms, use-924-1530 Page 2 The Sign In page displays. 3. Enter your SJSU ID and Password. 4. Click the Sign In button. 5 by Instructor info-support@sjsu.edu, 408-924-1530 Page 3 The SJSU Messaging Search page displays. 6. Click

  18. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

  19. Project Proposal Project Logistics

    E-Print Network [OSTI]

    Hall, Mary W.

    Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

  20. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

  1. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

  2. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

  3. Model-based Estimation of Flexibility and Optionability in an Integrated Real Options Framework

    E-Print Network [OSTI]

    Mikaelian, Tsoline

    Uncertainties can be managed through real options that provide a decision maker the right, but not the obligation, to exercise actions at a later time. In previous work we introduced an integrated real options framework ...

  4. CONNECTICUT BIOFUELS TECHNOLOGY PROJECT

    SciTech Connect (OSTI)

    BARTONE, ERIK

    2010-09-28T23:59:59.000Z

    DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

  5. A new option in ECE @ UBC The Biomedical Engineering (BE) option offers

    E-Print Network [OSTI]

    Pulfrey, David L.

    A new option in ECE @ UBC The Biomedical Engineering (BE) option offers the opportunity to gain core competency in fundamental electrical engineering topics, key topics in biomedical engineering on the Biomedical Engineering option: Student Services Electrical & Computer Engineering The University of British

  6. Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity Service

    E-Print Network [OSTI]

    Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity@IEOR.Berkeley.edu Abstract In a competitive electricity market traditional demand side management options offering customers curtailable service at reduced rates are replaced by voluntary customer responses to electricity spot prices

  7. architecture 2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option

    E-Print Network [OSTI]

    Papalambros, Panos

    credits) 1 environmental technology course (3 credits) 2 architectural history courses (6 credits) 3master of architecture (M.Arch.) #12;2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option Taubman College's 2-year master of architecture option

  8. ECONOMIC EVALUATION OF CO2 STORAGE AND SINK ENHANCEMENT OPTIONS

    SciTech Connect (OSTI)

    Bert Bock; Richard Rhudy; Howard Herzog; Michael Klett; John Davison; Danial G. De La Torre Ugarte; Dale Simbeck

    2003-02-01T23:59:59.000Z

    This project developed life-cycle costs for the major technologies and practices under development for CO{sub 2} storage and sink enhancement. The technologies evaluated included options for storing captured CO{sub 2} in active oil reservoirs, depleted oil and gas reservoirs, deep aquifers, coal beds, and oceans, as well as the enhancement of carbon sequestration in forests and croplands. The capture costs for a nominal 500 MW{sub e} integrated gasification combined cycle plant from an earlier study were combined with the storage costs from this study to allow comparison among capture and storage approaches as well as sink enhancements.

  9. First Look at Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Project planners should conduct a preliminary review of project energy needs and opportunities when considering renewable energy technologies. This makes energy an integral part of the project,...

  10. On Accurate Trinomial GARCH Option Pricing

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    On Accurate Trinomial GARCH Option Pricing Algorithms Advisor: Prof. Yuh-Dauh Lyuu Chun-Yang Liu Department of Computer Science and Information Engineering National Taiwan University #12;Abstract The GARCH-based GARCH option pricing algorithms suffer from exponential running time, inaccuracy, or other problems

  11. Montana State University 1 Geology Option

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Montana State University 1 Geology Option The Geology Option is a degree program designed and private sectors in fields such as petroleum geology, mining geology, seismology (including earthquake and volcanic risk assessment), hydrology (surface and ground water) natural-hazard geology, environmental clean

  12. Electric retail market options: The customer perspective

    SciTech Connect (OSTI)

    Hadley, S.W.; Hillsman, E.L.

    1995-07-01T23:59:59.000Z

    This report describes various options that are now available for retail electric customers, or that may become available during the next few years as the electric utility industry restructures. These options include different ways of meeting demand for energy services, different providers of service or points of contact with providers, and different pricing structures for purchased services. Purpose of this document is to examine these options from the customer`s perspective: how might being a retail electric customer in 5--10 years differ from now? Seizing opportunities to reduce cost of electric service is likely to entail working with different service providers; thus, transaction costs are involved. Some of the options considered are speculative. Some transitional options include relocation, customer-built/operated transmission lines, municipalization, self-generation, and long-term contracts with suppliers. All these may change or diminish in a restructured industry. Brokers seem likely to become more common unless restructuring takes the form of mandatory poolcos (wholesale). Some options appear robust, ie, they are likely to become more common regardless of how restructuring is accomplished: increased competition among energy carriers (gas vs electric), real-time pricing, etc. This report identified some of the qualitative differences among the various options. For customers using large amounts of electricity, different alternatives are likely to affect greatly service price, transaction costs, tailoring service to customer preferences, and risks for customer. For retail customers using small amounts of electricity, there may be little difference among the options except service price.

  13. Advice on 4th Year Computer Science Projects for Examination in Trinity Term of 2010

    E-Print Network [OSTI]

    Oxford, University of

    Advice on 4th Year Computer Science Projects for Examination in Trinity Term of 2010 Master to undertake a project in the fourth year. Mathematics and Computer Science candidates have the option to take a project, either a Computer Science project or a Mathematics project; a Mathematics project can either

  14. 8/8/12 Environmental Health Perspectives: Accounting for Nature's Benefits: The Dollar Value of Ecosystem ... 1/12ehp03.niehs.nih.gov/article/info%3Adoi%2F10.1289%2Fehp.120-a152

    E-Print Network [OSTI]

    of Ecosystem ... 1/12ehp03.niehs.nih.gov/article/info%3Adoi%2F10.1289%2Fehp.120-a152 Accounting for Nature Value of Ecosystem ... 2/12ehp03.niehs.nih.gov/article/info%3Adoi%2F10.1289%2Fehp.120-a152 Healthy: The Dollar Value of Ecosystem ... 3/12ehp03.niehs.nih.gov/article/info%3Adoi%2F10.1289%2Fehp.120-a152

  15. Project 1640 Palomar Procedures

    E-Print Network [OSTI]

    Lesker pressure gauge to the pressure sensor on the dewar (both shown in the photo below), and check you to adjust the settings (need more info here). Figure 1. The P1640 pressure sensor

  16. ECONOMIC MODELING OF RE-LICENSING AND DECOMMISSIONING OPTIONS FOR THE

    E-Print Network [OSTI]

    ECONOMIC MODELING OF RE-LICENSING AND DECOMMISSIONING OPTIONS FOR THE KLAMATH BASIN HYDROELECTRIC, and steelhead trout on the West Coast of the United States. PacifiCorp's 169-megawatt Klamath Hydroelectric Hydroelectric Project is the only thorough, objective and transparent assessment tool that analyzes the cost

  17. The Budget Outlook and Options for Fiscal Policy Alan J. Auerbach

    E-Print Network [OSTI]

    Sadoulet, Elisabeth

    The Budget Outlook and Options for Fiscal Policy Alan J. Auerbach William G. Gale Peter R. Orszag;ABSTRACT This paper examines the federal budget outlook and evaluates alternative fiscal policy choices. Official projections of the federal budget surplus have declined dramatically in the past year. Adjusting

  18. Evaluating the options for carbon sequestration Clair Gough and Simon Shackley

    E-Print Network [OSTI]

    Watson, Andrew

    Evaluating the options for carbon sequestration Clair Gough and Simon Shackley Tyndall Centre for carbon sequestration Tyndall Centre Technical Report No. 2 November 2002 This is the final report from Tyndall research project IT1.22 (Carbon sequestration: a pilot stage multi-criteria evaluation

  19. Submitted to Conference on Dredged Material Management: Options and Environmental Considerations

    E-Print Network [OSTI]

    Brookhaven National Laboratory

    Submitted to Conference on Dredged Material Management: Options and Environmental Considerations Cambridge, Massachusetts ­ 3-6 December 2000 Decontamination and Beneficial Use of Dredged Materials* E of dredged material decontamination technologies for the NY/NJ Harbor. The goal of the project is to assemble

  20. Advanced radioisotope power source options for Pluto Express

    SciTech Connect (OSTI)

    Underwood, M.L. [California Inst. of Technology, Pasadena, CA (United States). Jet Propulsion Lab.

    1995-12-31T23:59:59.000Z

    In the drive to reduce mass and cost, Pluto Express is investigating using an advanced power conversion technology in a small Radioisotope Power Source (RPS) to deliver the required mission power of 74 W(electric) at end of mission. Until this year the baseline power source under consideration has been a Radioisotope Thermoelectric Generator (RTG). This RTG would be a scaled down GPHS RTG with an inventory of 6 General Purpose Heat Sources (GPHS) and a mass of 17.8 kg. High efficiency, advanced technology conversion options are being examined to lower the power source mass and to reduce the amount of radioisotope needed. Three technologies are being considered as the advanced converter technology: the Alkali Metal Thermal-to-Electric Converter (AMTEC), Thermophotovoltaic (TPV) converters, and Stirling Engines. Conceptual designs for each of these options have been prepared. Each converter would require only 2 GPHSs to provide the mission power and would have a mass of 6.1, 7.2, and 12.4 kg for AMTEC, TPV, and Stirling Engines respectively. This paper reviews the status of each technology and the projected performance of an advanced RPS based on each technology. Based on the projected performance and spacecraft integration issues, Pluto Express would prefer to use the AMTEC based RPS. However, in addition to technical performance, selection of a power technology will be based on many other factors.

  1. Rolling Up a Put Option as Prices Increase

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-10-07T23:59:59.000Z

    Agricultural producers use put options to protect themselves against declining prices. The technique of "rolling up a put option, explained in this publication, allows the producer to raise the minimum expected selling price of a put option...

  2. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

  3. Local Option Municipal Economic Development Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act gives local governments the option to provide direct and indirect assistance to business enterprises in their communities, whether for expansion of existing operations, the creation of new...

  4. Comparison of Current LCD Tracking Options

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Comparison of Current LCD Tracking Options Bruce Schumm Santa Cruz Institute for Particle Physics for new S design (pattern recognition, resolution) S detector in real trouble at low angle w/out beam

  5. Comparison of Current LCD Tracking Options

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Comparison of Current LCD Tracking Options Bruce Schumm Santa Cruz Institute for Particle Physics tracking somewhat more pressed for new S design (pattern recognition, ` resolution) S detector in real

  6. Hedging Milk with BFP Futures and Options

    E-Print Network [OSTI]

    Anderson, David P.; McCorkle, Dean; Schwart Jr., Robert B.; Jones, Rodney

    1999-06-23T23:59:59.000Z

    Basic Formula Price (BFP) milk futures and options can be used to hedge, or lock in, milk prices in order to manage milk price fluctuations. This publication offers information on futures contracts, basis, cash settlement and margin call. There also...

  7. DSM Program Development. The demand-side resource options were developed using a combination of internal engineering estimates and external consulting services. The

    E-Print Network [OSTI]

    for the determination of the optimum program level to be included in the IRP. The demand-side management options wereDSM Program Development. The demand-side resource options were developed using a combination Practices Manual: Economic Analysis of Demand-side Programs and Projects.2 The proposed DSM programs

  8. Tool to Compare Solar Energy Program Financing Options | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Resources Tool to Compare Solar Energy Program Financing Options Tool to Compare Solar Energy Program Financing Options This model is intended to be used for...

  9. Waste Heat Management Options for Improving Industrial Process...

    Broader source: Energy.gov (indexed) [DOE]

    of waste heat streams, and options for recovery including Combined Heat and Power. Waste Heat Management Options for Improving Industrial Process Heating Systems...

  10. Renewable Power Options for Electricity Generation on Kaua'i...

    Office of Environmental Management (EM)

    Renewable Power Options for Electricity Generation on Kaua'i: Economics and Performance Modeling Renewable Power Options for Electricity Generation on Kaua'i: Economics and...

  11. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering, CVG4130 or CVG4148. Bien que les cotes de cours apparaissent dans les deux langues (anglais

  12. A Practical Approach to Modeling Managerial Risk Aversion in Real Option Valuation for Early Stage Investments ?

    E-Print Network [OSTI]

    Sebastian Jaimungal; Yuri Lawryshyn

    In this work, we build on a previous real options approach that utilizes managerial cash-flow estimates to value early stage project investments, but accounting for managerial risk aversion. We introduce a market sector indicator, which is assumed to be correlated to a tradeable market index, which, through a mapping function, drives and replicates the cash-flow estimates. The mapping allows us to link the cash-flow estimates to many theoretical real options frameworks which currently can not be applied in practice. Through indifference pricing we are able to model the effect of managerial risk aversion for any given set of cash-flow estimates.

  13. www.eandp.info E&P | November 2006 To realize the value of an Intelligent

    E-Print Network [OSTI]

    of oilfield automation. From the wave of ERP implementations around the turn of the millennium, the difference with the powerful new ERP tools. Similarly, most engineers have been associated with oilfield automation projects

  14. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

  15. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

  16. Title Efficient and Reliable Balanced Codes Contact Info Dr. ir. J.H. Weber, j.h.weber@tudelft.nl, tel. 015-2781698, office HB11.300

    E-Print Network [OSTI]

    Title Efficient and Reliable Balanced Codes Contact Info Dr. ir. J.H. Weber, j.h.weber. Inf. Theory, vol. 32, no. 1, pp. 51-53, Jan. 1986. [2] J.H. Weber, K.A. Schouhamer Immink, and H. 2012. More Info Upon appointment with dr. Weber #12;

  17. GENOVIS AB, Box 790, SE-220 07 LUND, SWEDEN Phone +46 46 10 12 30 Fax +46 46 12 80 20 info@genovis.com www.genovis.com

    E-Print Network [OSTI]

    Lebendiker, Mario

    GENOVIS AB, Box 790, SE-220 07 LUND, SWEDEN Phone +46 46 10 12 30 Fax +46 46 12 80 20 info LUND, SWEDEN Phone +46 46 10 12 30 Fax +46 46 12 80 20 info@genovis.com www.genovis.com APPLICATION

  18. PROJECT GOALS Determine what simple measures could be introduced to

    E-Print Network [OSTI]

    they would be willing to accept and at what cost TYPE OF PROJECT International Alliance of ResearchPROJECT GOALS · Determine what simple measures could be introduced to Bruce Hall's dining options available at Bruce Hall DESCRIPTION The Bruce Hall Dining Project investigated the sustainable practices

  19. Renewable Energies program (6 credit hour) Option A: 11

    E-Print Network [OSTI]

    Simaan, Nabil

    Renewable Energies program (6 credit hour) Option A: 11 Option B: The program is organized by t Spanish Institute and the Asso program on renewable energy will provide students with advanced knowledge. opportunities: option A- two renewable energies; option B include on-site visits to renewable energy generation

  20. Wireless Network Capacity Management: A Real Options Approach

    E-Print Network [OSTI]

    Forsyth, Peter A.

    capacity, market price of risk, investment timing option 1 Introduction Wireless networks are now regarded

  1. Hydrogen Production: Overview of Technology Options, January 2009

    Fuel Cell Technologies Publication and Product Library (EERE)

    Overview of technology options for hydrogen production, its challenges and research needs and next steps

  2. Project Management Project Managment

    E-Print Network [OSTI]

    Stephenson, Ben

    ­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

  3. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

  4. Energy Conservation Options in Distillation Processes

    E-Print Network [OSTI]

    Harris, G. E.; Hearn, W. R.; Blythe, G. M.; Stuart, J. M.

    1980-01-01T23:59:59.000Z

    ~itroo.? ':!OD.e~tell.,..ot!.k1 .'k..,.-.ottNltlu'..,. II ""'I'JI ..... ~I_ """-.4008l1"OO I ~.z.,. 1 ,1'1 (-frl-.'....u_~ R.da at AC~Ofllftl\\,J'ftlit...." ? I 5 "'-tlnc&! Tt.,.. ? 21.' \\lip Gilil.In31 j TnyE.'tIc>Mcy .11.1'llo I ~~TI""'.'2.at... I There are many options available to the engi*eer seeking to reduce the energy requirements of a distil lation process. The technology for most of these I, options has been available for many years, but it has only recently become economically...

  5. EIS-0123: Direct Service Industry Options

    Broader source: Energy.gov [DOE]

    BPA proposes to implement one or more options to reduce load fluctuations and revenue uncertainty resulting from its electrical service to 10 aluminum smelters and its other direct service industrial customers. BPA believes these options will give BPA greater ability to plan for power needs and help to maintain its relatively strong financial position during the current period of power surplus. They also are expected to enhance BPA's ability to repay the U.S. Treasury. In turn, BPA rates to other customers would stabilize.

  6. Systems analysis of decontamination options for civilian vehicles.

    SciTech Connect (OSTI)

    Foltz, Greg W.; Hoette, Trisha Marie

    2010-11-01T23:59:59.000Z

    The objective of this project, which was supported by the Department of Homeland Security (DHS) Science and Technology Directorate (S&T) Chemical and Biological Division (CBD), was to investigate options for the decontamination of the exteriors and interiors of vehicles in the civilian setting in order to restore those vehicles to normal use following the release of a highly toxic chemical. The decontamination of vehicles is especially challenging because they often contain sensitive electronic equipment, multiple materials some of which strongly adsorb chemical agents, and in the case of aircraft, have very rigid material compatibility requirements (i.e., they cannot be exposed to reagents that may cause even minor corrosion). A systems analysis approach was taken examine existing and future civilian vehicle decontamination capabilities.

  7. Options for treating high-temperature gas-cooled reactor fuel for repository disposal

    SciTech Connect (OSTI)

    Lotts, A.L.; Bond, W.D.; Forsberg, C.W.; Glass, R.W.; Harrington, F.E.; Micheals, G.E.; Notz, K.J.; Wymer, R.G.

    1992-02-01T23:59:59.000Z

    This report describes the options that can reasonably be considered for disposal of high-temperature gas-cooled reactor (HTGR) fuel in a repository. The options include whole-block disposal, disposal with removal of graphite (either mechanically or by burning), and reprocessing of spent fuel to separate the fuel and fission products. The report summarizes what is known about the options without extensively projecting or analyzing actual performance of waste forms in a repository. The report also summarizes the processes involved in convert spent HTGR fuel into the various waste forms and projects relative schedules and costs for deployment of the various options. Fort St. Vrain Reactor fuel, which utilizes highly-enriched {sup 235}U (plus thorium) and is contained in a prismatic graphite block geometry, was used as the baseline for evaluation, but the major conclusions would not be significantly different for low- or medium-enriched {sup 235}U (without thorium) or for the German pebble-bed fuel. Future US HTGRs will be based on the Fort St. Vrain (FSV) fuel form. The whole block appears to be a satisfactory waste form for disposal in a repository and may perform better than light-water reactor (LWR) spent fuel. From the standpoint of process cost and schedule (not considering repository cost or value of fuel that might be recycled), the options are ranked as follows in order of increased cost and longer schedule to perform the option: (1) whole block, (2a) physical separation, (2b) chemical separation, and (3) complete chemical processing.

  8. Proc. SPIE 8396, Geospatial InfoFusion II, 83960N (May 1, 2012); doi:10.1117/12.920878 Modeling spatial uncertainties in geospatial data fusion and mining

    E-Print Network [OSTI]

    Kovalerchuk, Boris

    ., Seattle, WA, 98178 ABSTRACT Geospatial data analysis relies on Spatial Data Fusion and Mining (SDFMProc. SPIE 8396, Geospatial InfoFusion II, 83960N (May 1, 2012); doi:10.1117/12.920878 Modeling spatial uncertainties in geospatial data fusion and mining Boris Kovalerchuka* , Leonid Perlovskyb

  9. Title Distributed Multi-Microphone Speech Enhancement Contact Info Dr. ir. R.C. Hendriks (r.c.hendriks@tudelft.nl)

    E-Print Network [OSTI]

    Title Distributed Multi-Microphone Speech Enhancement Contact Info Dr. ir. R.C. Hendriks (r and interferences is to use multi- microphone speech enhancement methods like beamforming or multi-microphone Wiener of new multi-microphone speech enhancement algorithms that can run in such a distributed setup. The goal

  10. H:\\INST\\AUXBGT\\FY13UWM\\Kickoff Info\\Kickoff Packet\\1213 Aux Kickoff Agenda.doc University of Wisconsin Milwaukee

    E-Print Network [OSTI]

    Saldin, Dilano

    June 2013 June 2014 June 2015 June 2016 H:\\INST\\AUXBGT\\FY13UWM\\Internal Aux Financing\\Fund 128 ProjH:\\INST\\AUXBGT\\FY13UWM\\Kickoff Info\\Kickoff Packet\\1213 Aux Kickoff Agenda.doc University of Wisconsin ­ Milwaukee 201213 Auxiliary Budget Kickoff Meeting October 12, 2011 10:00 ­ 11:30 Regents

  11. Country Name Address Town State Postcode Telephone Email ARGENTINA CW International Education Piso 6 A, Ciudad Buenos Aires 1425 54 11 48010867 info@cwinternationaleducation.com

    E-Print Network [OSTI]

    Chen, Ying

    Country Name Address Town State Postcode Telephone Email ARGENTINA CW International Education Piso 6 A, Ciudad Buenos Aires 1425 54 11 48010867 info@cwinternationaleducation.com ARGENTINA Latino Australia Education - Buenos Aires Riobamba 972 4C Buenos Aires 11 37931600 argentina

  12. Northwest Straits Commission, 10441 Bayview Edison Rd., Mt. Vernon WA 98273 phone: 360.428-1064 e-mail: info@nwstraits.org web: www.nwstraits.org

    E-Print Network [OSTI]

    Ocean acidification is a change in seawater chemistry due to the absorption of carbon dioxide. It is a local and global problem; a consequence of man-made carbon emissions. In Puget Sound, shellfish-mail: info@nwstraits.org web: www.nwstraits.org Ocean Acidification: Local action in the Northwest Straits

  13. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

  14. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

  15. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

  16. EXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS

    E-Print Network [OSTI]

    the last decade have been directed at increasing competition in the generation of electricity. This hasEXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS RAJNISH KAMAT and SHMUEL S. OREN of financial contracts for the supply and procurement of interruptible electricity service. While the contract

  17. Test Preparation Options Free Test Prep Websites

    E-Print Network [OSTI]

    Stowell, Michael

    Test Preparation Options Free Test Prep Websites ACT: http: http://www.collegeboard.com/student/testing/sat/prep_one/test.html http://www.number2.com://testprep.princetonreview.com/CourseSearch/Search.aspx?itemCode=17&productType=F&rid=1&zip=803 02 Test Prep Classes Front Range Community College: Classes

  18. Waste disposal options report. Volume 1

    SciTech Connect (OSTI)

    Russell, N.E.; McDonald, T.G.; Banaee, J.; Barnes, C.M.; Fish, L.W.; Losinski, S.J.; Peterson, H.K.; Sterbentz, J.W.; Wenzel, D.R.

    1998-02-01T23:59:59.000Z

    This report summarizes the potential options for the processing and disposal of mixed waste generated by reprocessing spent nuclear fuel at the Idaho Chemical Processing Plant. It compares the proposed waste-immobilization processes, quantifies and characterizes the resulting waste forms, identifies potential disposal sites and their primary acceptance criteria, and addresses disposal issues for hazardous waste.

  19. Pilot Plant Options for the MFE Roadmap

    E-Print Network [OSTI]

    Pilot Plant Options for the MFE Roadmap Hutch Neilson Princeton Plasma Physics Laboratory International Workshop MFE Roadmapping for the ITER Era Princeton, NJ 10 September 2011 #12;Outline 2 · Pilot plant ­ mission, motivation, and description. · Role of pilot plants on the Roadmap to Demo. Pilot Plant

  20. Advanced ignition options for laser ICF

    E-Print Network [OSTI]

    University of Rochester and Princeton Plasma Physics Laboratory #12;FSC · With day-one hardware, the NIF can explore high-gain shock ignition - Polar Shock Ignition (uses half the NIF beams to drive the implosion: multi-FM or 2D-SSD (talk by J. Soures at this meeting) The NIF can explore advanced ignition options

  1. RTGs Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01T23:59:59.000Z

    A small spacecraft design for the Pluto Fast Flyby (PFF) Mission is under study by the Jet Propulsion Laboratory (JPL) for the National Aeronautics and Space Administration (NASA), for a possible launch as early as 1998. JPL's 1992 baseline design calls for a power source able to furnish an energy output of 3963 kWh and a power output of 69 watts(e) at the end of the 9.2-year mission. Satisfying those demands is made difficult because NASA management has set a goal of reducing the spacecraft mass from a baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for the power source. To support the ongoing NASA/JPL studies, the Department of Energy's Office of Special Applications (DOE/OSA) commissioned Fairchild Space to prepare and analyze conceptual designs of radioisotope power systems for the PFF mission. Thus far, a total of eight options employing essentially the same radioisotope heat source modules were designed and subjected to thermal, electrical, structural, and mass analyses by Fairchild. Five of these - employing thermoelectric converters - are described in the present paper, and three - employing free-piston Stirling converters - are described in the companion paper presented next. The system masses of the thermoelectric options ranged from 19.3 kg to 10.2 kg. In general, the options requiring least development are the heaviest, and the lighter options require more development with greater programmatic risk. There are four duplicate copies

  2. Parking Options 2011/12 Reserved Permits

    E-Print Network [OSTI]

    Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

  3. Options for Affordable Fission Surface Power Systems

    SciTech Connect (OSTI)

    Houts, Mike; Gaddis, Steve; Porter, Ron; Van Dyke, Melissa; Martin, Jim; Godfroy, Tom; Bragg-Sitton, Shannon; Garber, Anne; Pearson, Boise [NASA Marshall Space Flight Center, VP31, MSFC, AL 35812 (United States)

    2006-07-01T23:59:59.000Z

    Fission surface power systems could provide abundant power anywhere on the surface of the moon or Mars. Locations could include permanently shaded regions on the moon and high latitudes on Mars. To be fully utilized, however, fission surface power systems must be safe, have adequate performance, and be affordable. This paper discusses options for the design and development of such systems. (authors)

  4. Interdisciplinary Option Computer Science Graduation Worksheet

    E-Print Network [OSTI]

    Dyer, Bill

    Engineering 3 CSCI 338 Computer Science Theory 3 CSCI 361 Computer Architecture 3 CSCI 481 Program Assessment. · The Statistics Elective can be satisfied by any probability or statistics course, such as EIND 354Interdisciplinary Option Computer Science Graduation Worksheet 2010-2012 Semester Catalog Revised

  5. Volume Project

    E-Print Network [OSTI]

    rroames

    2010-01-12T23:59:59.000Z

    Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base ...

  6. Sequestration Options for the West Coast States

    SciTech Connect (OSTI)

    Larry Myer

    2006-04-30T23:59:59.000Z

    The West Coast Regional Carbon Sequestration Partnership (WESTCARB) is one of seven partnerships that have been established by the U.S. Department of Energy (DOE) to evaluate carbon capture and sequestration (CCS) technologies best suited for different regions of the country. The West Coast Region comprises Arizona, California, Nevada, Oregon, Washington, Alaska, and British Columbia. Led by the California Energy Commission, WESTCARB is a consortium of about 70 organizations, including state natural resource and environmental protection agencies; national laboratories and universities; private companies working on carbon dioxide (CO{sub 2}) capture, transportation, and storage technologies; utilities; oil and gas companies; nonprofit organizations; and policy/governance coordinating organizations. Both terrestrial and geologic sequestration options were evaluated in the Region during the 18-month Phase I project. A centralized Geographic Information System (GIS) database of stationary source, geologic and terrestrial sink data was developed. The GIS layer of source locations was attributed with CO{sub 2} emissions and other data and a spreadsheet was developed to estimate capture costs for the sources in the region. Phase I characterization of regional geological sinks shows that geologic storage opportunities exist in the WESTCARB region in each of the major technology areas: saline formations, oil and gas reservoirs, and coal beds. California offers outstanding sequestration opportunities because of its large capacity and the potential of value-added benefits from enhanced oil recovery (EOR) and enhanced gas recovery. The estimate for storage capacity of saline formations in the ten largest basins in California ranges from about 150 to about 500 Gt of CO{sub 2}, the potential CO{sub 2}-EOR storage was estimated to be 3.4 Gt, and the cumulative production from gas reservoirs suggests a CO{sub 2} storage capacity of 1.7 Gt. A GIS-based method for source-sink matching was implemented and preliminary marginal cost curves developed, which showed that 20, 40, or 80 Mega tonnes (Mt) of CO{sub 2} per year could be sequestered in California at a cost of $31/tonne (t), $35/t, or $50/t, respectively. Phase I also addressed key issues affecting deployment of CCS technologies, including storage-site monitoring, injection regulations, and health and environmental risks. A framework for screening and ranking candidate sites for geologic CO{sub 2} storage on the basis of HSE risk was developed. A webbased, state-by-state compilation of current regulations for injection wells, and permits/contracts for land use changes, was developed, and modeling studies were carried out to assess the application of a number of different geophysical techniques for monitoring geologic sequestration. Public outreach activities resulted in heightened awareness of sequestration among state, community and industry leaders in the Region. Assessment of the changes in carbon stocks in agricultural lands showed that Washington, Oregon and Arizona were CO{sub 2} sources for the period from 1987 to 1997. Over the same period, forest carbon stocks decreased in Washington, but increased in Oregon and Arizona. Results of the terrestrial supply curve analyses showed that afforestation of rangelands and crop lands offer major sequestration opportunities; at a price of $20 per t CO{sub 2}, more than 1,233 MMT could be sequestered over 40-years in Washington and more than 1,813 MMT could be sequestered in Oregon.

  7. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering or CVG4148. Bien que les cotes de cours apparaissent dans les deux langues (anglais/français), les cours

  8. Gnie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingénierie / Engineering GNG4170/4570 2010.12.02 Bien que les cotes de cours apparaissent dans les deux langues (anglais

  9. Gnie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingénierie / Engineering GNG4170/4570 2011.11.07 Bien que les cotes de cours apparaissent dans les deux langues (anglais

  10. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering cotes de cours apparaissent dans les deux langues (anglais/français), les cours en français ne sont pas

  11. Gnie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingénierie / Engineering GNG4170/4570 2010.03.21 Bien que les cotes de cours apparaissent dans les deux langues (anglais

  12. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering, CVG4113, CVG4130 or CVG4148. Bien que les cotes de cours apparaissent dans les deux langues (anglais

  13. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  14. Microsoft Word - info quality guidelines updated 3-7-11.docx

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »Exchange Visitorsfor ShadeProject ManhattanMentorp DEPARTMENT OF

  15. Effect of Fuel and Design Options on RTG Performance versus PFF Power Demand

    SciTech Connect (OSTI)

    Schock, Alfred; Or, Chuen T

    1994-08-01T23:59:59.000Z

    Paper presented at the 29th IECEC in Monterey, CA in August 1994. The present paper confines its attention to the relatively conservative option employing standard thermoelectric unicouples, since that may be the only one flight-ready for the projected PFF launch in 2001. There are four copies in the file; also a copy in the ESD files. Included in the file are two previous documents with the same title dated 4/18/1994.

  16. Project X -Kaon Targetry, N. Simos BNL Meeting March 1, 2012 1

    E-Print Network [OSTI]

    McDonald, Kirk

    Project X - Kaon Targetry, N. Simos BNL Meeting March 1, 2012 1 Project X ­ Kaon Targetry N. Simos BNL #12;Project X - Kaon Targetry, N. Simos BNL Meeting March 1, 2012 2 SEVERAL Studies conducted in a multi MW environment SOLID Target Options and Studies Required #12;Project X - Kaon Targetry, N. Simos

  17. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

  18. Natural Gas as a Fuel Option for Heavy Vehicles

    SciTech Connect (OSTI)

    James E. Wegrzyn; Wai Lin Litzke; Michael Gurevich

    1999-04-26T23:59:59.000Z

    The U.S. Department of Energy (DOE), Office of Heavy Vehicle Technologies (OHVT) is promoting the use of natural gas as a fuel option in the transportation energy sector through its natural gas vehicle program [1]. The goal of this program is to eliminate the technical and cost barriers associated with displacing imported petroleum. This is achieved by supporting research and development in technologies that reduce manufacturing costs, reduce emissions, and improve vehicle performance and consumer acceptance for natural gas fueled vehicles. In collaboration with Brookhaven National Laboratory, projects are currently being pursued in (1) liquefied natural gas production from unconventional sources, (2) onboard natural gas storage (adsorbent, compressed, and liquefied), (3) natural gas delivery systems for both onboard the vehicle and the refueling station, and (4) regional and enduse strategies. This paper will provide an overview of these projects highlighting their achievements and current status. In addition, it will discuss how the individual technologies developed are being integrated into an overall program strategic plan.

  19. MCNP6 Cosmic-Source Option

    SciTech Connect (OSTI)

    McKinney, Gregg W [Los Alamos National Laboratory; Armstrong, Hirotatsu [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Clem, John [University of Delaware, BRI; Goldhagen, Paul [DHS, National Urban Security Technology Laboratory

    2012-06-19T23:59:59.000Z

    MCNP is a Monte Carlo radiation transport code that has been under development for over half a century. Over the last decade, the development team of a high-energy offshoot of MCNP, called MCNPX, has implemented several physics and algorithm improvements important for modeling galactic cosmic-ray (GCR) interactions with matter. In this presentation, we discuss the latest of these improvements, a new Cosmic-Source option, that has been implemented in MCNP6.

  20. Cyanide treatment options in coke plants

    SciTech Connect (OSTI)

    Minak, H.P.; Lepke, P. [Krupp Uhde GmbH, Dortmund (Germany)

    1997-12-31T23:59:59.000Z

    The paper discusses the formation of cyanides in coke oven gas and describes and compares waste processing options. These include desulfurization by aqueous ammonia solution, desulfurization using potash solution, desulfurization in oxide boxes, decomposition of NH{sub 3} and HCN for gas scrubbing. Waste water treatment methods include chemical oxidation, precipitation, ion exchange, reverse osmosis, and biological treatment. It is concluded that biological treatment is the most economical process, safe in operation and requires a minimum of manpower.

  1. Thermal Storage Options for HVAC Systems

    E-Print Network [OSTI]

    Weston, R. F.; Gidwani, B. N.

    THERMAL STORAGE OPTIONS FOR HVAC SYSTEMS B. N. Gidwani, P.E. Roy F. Weston, Inc. West Chester, Pennsylvania ABSTRACT With the ever-increasing cost of electricity and the high demand charges levied by utility compa nies, thermal storage... for cooling is rapidly becom ing a widely recognized method to lower cooling costs. There are three maior types of thermal stor age systems: ? Ice Storage: This utilizes the latent heat of fusion of ice for thermal storage. During off Deak periods...

  2. Seattle's system for evaluating energy options

    SciTech Connect (OSTI)

    Logie, P.; Macdonald, M.J.

    1982-01-01T23:59:59.000Z

    In 1975, the City Council developed a blueprint called Energy 1990 for meeting Seattle's future electric energy needs. Priorities for addressing or offsetting expected growth in demand are in order: (1) conservation (2) hydroelectricity (3) other renewable sources such as wind, biomass, solar, and geothermal energy (4) abundant nonrenewable resources such as coal, and (5) other renewables. An energy resources planning group was formed and a data base was established. Resource options were investigated and the recommendations were published.

  3. Modeling Dependence in Data: Options Pricing and Random Walks

    E-Print Network [OSTI]

    Kumar, Nitesh

    2013-01-01T23:59:59.000Z

    option pricing under GARCH by a Markov chain approximation.S. (2000). A closed-form GARCH option valuation model. Theof stochastic and/or GARCH volatility (Heston, 1993; Heston

  4. Using Options to Hedge Farm and Ranch Inputs

    E-Print Network [OSTI]

    Anderson, David P.; McCorkle, Dean; Schwart Jr., Robert B.; O'Brien, Daniel

    1999-09-29T23:59:59.000Z

    A call option is a pricing tool that helps producers manage the price risks associated with farm and ranch inputs. This publication offers a thorough explanation of the way call options work. It includes various strategies producers might use...

  5. The British Asian Option K. Glover, G. Peskir & F. Samee

    E-Print Network [OSTI]

    Sidorov, Nikita

    The British Asian Option K. Glover, G. Peskir & F. Samee Sequential Anal. Vol. 29, No. 3, 2010 Option K. Glover, G. Peskir & F. Samee Sequential Anal. Vol. 29, No. 3, 2010, (311­327) Research Report

  6. The British Russian Option K. Glover, G. Peskir & F. Samee

    E-Print Network [OSTI]

    Sidorov, Nikita

    The British Russian Option K. Glover, G. Peskir & F. Samee Stochastics Vol. 83, No. 4-6, 2011, (315 and Statistics Group School of Mathematics, The University of Manchester #12;The British Russian Option K. Glover

  7. Options for Burning LWR SNF in LIFE Engine

    SciTech Connect (OSTI)

    Farmer, J

    2008-09-09T23:59:59.000Z

    We have pursued two processes in parallel for the burning of LWR SNF in the LIFE engine: (1) solid fuel option and (2) liquid fuel option. Approaches with both are discussed. The assigned Topical Report on liquid fuels is attached.

  8. Analysis of sustainable water supply options for Kuwait

    E-Print Network [OSTI]

    Murtaugh, Katharine A. (Katharine Ann)

    2006-01-01T23:59:59.000Z

    This thesis considers several options for improving the sustainability of Kuwait's water supply system. The country currently relies heavily on desalination and brackish groundwater extraction. The options considered for ...

  9. Pricing A Class of Multiasset Options using Information on Smaller ...

    E-Print Network [OSTI]

    2007-03-19T23:59:59.000Z

    Mar 19, 2007 ... Extensions to markets where only a finite set of options are traded on ...... On non-

  10. UBC Social Ecological Economic Development Studies (SEEDS) Student Report An Investigation Into Solar Panel Options For The New SUB

    E-Print Network [OSTI]

    Into Solar Panel Options For The New SUB Henry Lo, Miguel Antonio University of British Columbia APSC261 the current status of the subject matter of a project/report". #12;i AN INVESTIGATION INTO SOLAR PANEL that has been done on solar panels as a renewable energy source and the feasibility of using it in the new

  11. Honors Option for Architectural Design Majors It is now possible for Architectural Design Majors to graduate under the Honors

    E-Print Network [OSTI]

    Prinz, Friedrich B.

    to graduate under the Honors option. The Honors Program offers eligible students the opportunity to engage in guided original research, or project design, over the course of an academic year. For interested students. Applications must be received in the fourth quarter prior to graduation. It is strongly suggested that students

  12. An Accurate and Provably Efficient GARCH Option Pricing Tree

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    An Accurate and Provably Efficient GARCH Option Pricing Tree Advisor: Prof. Yuh-Dauh Lyuu Chi-Ning Wu Department of Finance National Taiwan University #12;Abstract The trinomial-tree GARCH option not prevent explosion. This thesis then presents a trinomial-tree GARCH option pricing algorithm that solves

  13. Cache-Optimal Algorithms for Option Pricing John E. Savage

    E-Print Network [OSTI]

    Savage, John

    , and the leaves are at expiration times. We use G (n) biop to determine the price of an option at the root node a discrete time model [Kwok 1998; Cox et al. 1979]. The binomial option pricing computation is modeledCache-Optimal Algorithms for Option Pricing John E. Savage Brown University, Providence, Rhode

  14. PRICING AND HEDGING SPREAD OPTIONS RENE CARMONA AND VALDO DURRLEMAN

    E-Print Network [OSTI]

    Carmona, Rene

    energy prices dynamics, and we explain how the pricing and hedging algorithms can be implemented bothPRICING AND HEDGING SPREAD OPTIONS REN´E CARMONA AND VALDO DURRLEMAN ABSTRACT. We survey the theoretical and the computational problems associated with the pricing of spread options. These options

  15. Architecture independent parallel binomial tree option price valuations

    E-Print Network [OSTI]

    Gerbessiotis, Alexandros V.

    Architecture independent parallel binomial tree option price valuations Alexandros V. Gerbessiotis­02 #12; Architecture independent parallel binomial tree option price valuations Alexandros V in American or European­style option valuations can be performed in parallel in the binomial­tree model

  16. Industrial Engineering-BS ,PhD option in Engineering

    E-Print Network [OSTI]

    Dyer, Bill

    I Industrial Engineering- BS ,PhD option in Engineering Industrial & Management Engineering - BS MS Applied Mathematics - BS optionin Mathematics Applied Mechanics PhD option in Engineering Applied; teaching "minor, Art History minor Art.History - BA option in Art; minor B Bio-resources`Engineering - BS

  17. THE COSTS AND BENEFITS OF A PUBLIC OPTION IN

    E-Print Network [OSTI]

    Kammen, Daniel M.

    THE COSTS AND BENEFITS OF A PUBLIC OPTION IN HEALTH CARE REFORM: An Economic Analysis Ethan Kaplan and Benefits of a Public Option in Health Care Reform: An Economic Analysis ACKNOWLEDGMENTS We would like Security|The Costs and Benefits of a Public Option in Health Care Reform: An Economic Analysis EXECUTIVE

  18. The Information in Option Volume for Future Stock Prices

    E-Print Network [OSTI]

    Gabrieli, John

    that option trading volume contains information about future stock prices. Taking advantage of a unique dataThe Information in Option Volume for Future Stock Prices Jun Pan MIT Sloan School of Management set, we construct put-call ratios from option volume initiated by buyers to open new positions. Stocks

  19. Public Bonding Options | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    While the revenue stream need not be directly related to the financed project, capital lease revenue bonds entail a third party guaranteeing an energy savings revenue stream,...

  20. Optimization Online - Real Options: A Survey

    E-Print Network [OSTI]

    Elcin Cetinkaya

    2015-01-02T23:59:59.000Z

    Jan 2, 2015 ... ... finite-difference methods) and a wide array of application areas, from R&D to operations management to renewable energy project selection.

  1. THE ECONOMIC THRESHOLD WITH A STOCHASTIC PEST POPULATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Saphores, Jean-Daniel M

    2007-01-01T23:59:59.000Z

    101. Trigeorgis, L. , Real Options: Managerial FlexibilityPEST POPULATION: A REAL OPTIONS APPROACH ? Jean-Daniel M.Keywords: Uncertainty; Real Options; Pest Control; Reentry

  2. Circle Project

    E-Print Network [OSTI]

    This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied ...

  3. Voici donc le dernier numro de Gosciences-Infos avant l't. Un t sans rapport AERES rdiger... Mais avec quelques devoirs de vacances tout de mme, de faon tre tout--fait

    E-Print Network [OSTI]

    Demouchy, Sylvie

    édito Voici donc le dernier numéro de Géosciences-Infos avant l'été. Un été sans rapport AERES à

  4. Mac mini: How to Reset the PMU http://docs.info.apple.com/article.html?artnum=300574 1 of 2 7/23/2007 2:06 PM

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    Mac mini: How to Reset the PMU http://docs.info.apple.com/article.html?artnum=300574 1 of 2 7 the PMU on a Mac mini and it still isn't displaying video or turning on, contact Apple technical support (1-800-APL-CARE in the U.S.) or take your computer to your local Apple Retail Store or Apple

  5. PFBC Utility Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1992-11-01T23:59:59.000Z

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  6. Distillation: Still towering over other options

    SciTech Connect (OSTI)

    Kunesh, J.G. [Fractionation Research, Inc., Stillwater, OK (United States); Kister, H.Z. [Brown and Root, Inc., Alhambra (Canada); Lockett, M.J. [Praxair, Inc., Tonawanda, NY (United States); Fair, J.R. [Univ. of Texas, Austin, TX (United States)

    1995-10-01T23:59:59.000Z

    Distillation dominates separations in the chemical process industries (CPI), at least for mixtures that normally are processed as liquids. The authors fully expect that distillation will continue to be the method of choice for many separations, and the method against which other options must be compared. So, in this article, they will put into some perspective just why distillation continues to reign as the king of separations, and what steps are being taken to improve its applicability and performance, as well as basic understanding of the technique.

  7. Food Options | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor's note: Since the FlickrFluorimeterFood Options

  8. The Biocatalytic Desulfurization Project

    SciTech Connect (OSTI)

    David Nunn; James Boltz; Philip M. DiGrazia; Larry Nace

    2006-03-03T23:59:59.000Z

    The material in this report summarizes the Diversa technical effort in development of a biocatalyst for the biodesulfurization of Petro Star diesel as well as an economic report of standalone and combined desulfurization options, prepared by Pelorus and Anvil, to support and inform the development of a commercially viable process. We will discuss goals of the projected as originally stated and their modification as guided by parallel efforts to evaluate commercialization economics and process parameters. We describe efforts to identify novel genes and hosts for the generation of an optimal biocatalyst, analysis of diesel fuels (untreated, chemically oxidized and hydrotreated) for organosulfur compound composition and directed evolution of enzymes central to the biodesulfurization pathway to optimize properties important for their use in a biocatalyst. Finally we will summarize the challenges and issues that are central to successful development of a viable biodesulfurization process.

  9. Cementitious waste option scoping study report

    SciTech Connect (OSTI)

    Lee, A.E.; Taylor, D.D.

    1998-02-01T23:59:59.000Z

    A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

  10. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2010-03-16 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  11. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2013-03-22 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  12. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2011-11-03 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  13. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2010-12-01 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  14. DEGREES, MAJORS, AND OPTIONS This is a list of the degrees, majors, and options

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    &S) Asian Studies* (L&S) Astronomy - Physics* (L&S) Atmospheric and Oceanic Sciences* (L&S) Biochemistry* (L to the degree are shown. These degree titles appear on the student's transcript and on the diploma. The major titles and any applicable options appear only on the student's transcript. The school

  15. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  16. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  17. Procurement Options for New Renewable Electricity Supply

    SciTech Connect (OSTI)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01T23:59:59.000Z

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  18. Waste disposal options report. Volume 2

    SciTech Connect (OSTI)

    Russell, N.E.; McDonald, T.G.; Banaee, J.; Barnes, C.M.; Fish, L.W.; Losinski, S.J.; Peterson, H.K.; Sterbentz, J.W.; Wenzel, D.R.

    1998-02-01T23:59:59.000Z

    Volume 2 contains the following topical sections: estimates of feed and waste volumes, compositions, and properties; evaluation of radionuclide inventory for Zr calcine; evaluation of radionuclide inventory for Al calcine; determination of k{sub eff} for high level waste canisters in various configurations; review of ceramic silicone foam for radioactive waste disposal; epoxides for low-level radioactive waste disposal; evaluation of several neutralization cases in processing calcine and sodium-bearing waste; background information for EFEs, dose rates, watts/canister, and PE-curies; waste disposal options assumptions; update of radiation field definition and thermal generation rates for calcine process packages of various geometries-HKP-26-97; and standard criteria of candidate repositories and environmental regulations for the treatment and disposal of ICPP radioactive mixed wastes.

  19. Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design

    E-Print Network [OSTI]

    Ogden, Joan M; Yang, Christopher

    2005-01-01T23:59:59.000Z

    impact of improved hydrogen storage may be through makingand M. Gardiner, Hydrogen Storage Options: Technologies andscience related to hydrogen storage could change how a

  20. Options for Energy Efficiency in India and Barriers to Their...

    Open Energy Info (EERE)

    to Their Adoption: A Scoping Study Jump to: navigation, search Name Options for Energy Efficiency in India and Barriers to Their Adoption: A Scoping Study AgencyCompany...

  1. How to implement renewable energy and energy efficiency options...

    Open Energy Info (EERE)

    implement renewable energy and energy efficiency options Support for South African local government Jump to: navigation, search Tool Summary LAUNCH TOOL Name: How to implement...

  2. Investigation of energy storage options for sustainable energy systems.

    E-Print Network [OSTI]

    Hosseini, Mehdi

    2013-01-01T23:59:59.000Z

    ??Determination of the possible energy storage options for a specific source of energy requires a thorough analysis from the points of energy, exergy, and exergoeconomics.… (more)

  3. Feebates: A Legislative Option to Encourage Continuous Improvements...

    Open Energy Info (EERE)

    Feebates: A Legislative Option to Encourage Continuous Improvements to Automobile Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Feebates: A Legislative...

  4. Directory of Standard, Optional and Other Agency Forms

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1989-12-12T23:59:59.000Z

    The directive lists the Directory of Standard, Optional and Other Agency Forms and includes a list of Departmental reports and forms managers. Cancels DOE 1322.4A.

  5. Decoupling Policies: Options to Encourage Energy Efficiency Policies...

    Broader source: Energy.gov (indexed) [DOE]

    Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL)...

  6. Assessment of Future Vehicle Transportation Options and their...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future Vehicle Transportation Options and Their Impact on the Electric Grid January 10, 2010 New Analysis of Alternative Transportation Technologies 3 What's New? * Additional...

  7. NCSL - State Policy Options: A Report of the National Conference...

    Open Energy Info (EERE)

    NCSL - State Policy Options: A Report of the National Conference of State Legislatures Task Force on military and Veterans Affairs Jump to: navigation, search OpenEI Reference...

  8. Announcement Notice Options By STI Type | Scientific and Technical...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Option BooksMonographs (non-copyrighted) BooksMonographs (copyrighted) Conference PapersPresentationsProceedings (non-copyrighted Conference Papers...

  9. Clean Energy Options for Sabah: An Analysis of Resource Availability...

    Open Energy Info (EERE)

    An Analysis of Resource Availability and Cost Jump to: navigation, search Name Clean Energy Options for Sabah: An Analysis of Resource Availability and Cost AgencyCompany...

  10. DOE Exercises 5 Year Option on Washington TRU Solutions Contract...

    Office of Environmental Management (EM)

    and operating the Department's Waste Isolation Pilot Plant (WIPP), located in New Mexico. The option DOE exercised is a part of the WIPP contract that was competitively...

  11. HIE-ISOLDE the technical options

    E-Print Network [OSTI]

    Nilsson, Thomas

    2006-01-01T23:59:59.000Z

    The ISOLDE facility at CERN has a long and successful tradition of continuous development and growth in order to meet the scientific requests from the user community. The current situation continues this habit and several projects to increase the scientific scope of the facility through technical developments are under way or envisaged within the medium-term future planning. These developments will result in a transformed facility with the label HIE (High Intensity and Energy)-ISOLDE where the intensity, quality, and energy range of the secondary beams will be substantially improved. They are largely in line with the necessary technical developments towards the future EURISOL facility. This report summarizes these development projects.

  12. Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi

    E-Print Network [OSTI]

    Johnson, Eric E.

    Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi solar resource, studying different technology options, anticipating performance, and evaluating the economics of the solar power technologies. The NMSU team is evaluating the potential environmental impacts

  13. Project X

    E-Print Network [OSTI]

    Holmes, Steve

    2014-01-01T23:59:59.000Z

    provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

  14. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  15. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

  16. Jump Starting GARCH: Pricing Options with Jumps in Returns and

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Jump Starting GARCH: Pricing Options with Jumps in Returns and Volatilities J. Duan, P. Ritchken and volatilities. Our model nests Duan's GARCH option models where conditional returns are constrained to being normal, as well as extends Merton's jump-diffusion model by allowing return volatility to exhibit GARCH

  17. Columbia University Energy Options & Paths to Climate Stabilization

    E-Print Network [OSTI]

    Mauel, Michael E.

    -lived radioactive components. · Safe: no catastrophic accidents; Low-risk for nuclear materials proliferation WhyMike Mauel Columbia University Energy Options & Paths to Climate Stabilization Aspen, 9 July 2003 Fusion Energy: "Pipe Dream or Panacea" #12;Mike Mauel Columbia University Energy Options & Paths

  18. Trinomialtree based parallel option price Alexandros V. Gerbessiotis

    E-Print Network [OSTI]

    Gerbessiotis, Alexandros V.

    can be performed in parallel. We introduce a method in performing these valuations in parallelTrinomial­tree based parallel option price valuations Alexandros V. Gerbessiotis Department; Trinomial­tree based parallel option price valuations Alexandros V. Gerbessiotis CS Department New Jersey

  19. QUADRATIC CONVERGENCE FOR VALUING AMERICAN OPTIONS USING A PENALTY METHOD

    E-Print Network [OSTI]

    Forsyth, Peter A.

    QUADRATIC CONVERGENCE FOR VALUING AMERICAN OPTIONS USING A PENALTY METHOD P.A. FORSYTH AND K.R. VETZAL Abstract. The convergence of a penalty method for solving the discrete regularized American option valuation problem is studied. Sufficient conditions are derived which both guarantee conver- gence

  20. Swing Options Valuation: a BSDE with Constrained Jumps Approach

    E-Print Network [OSTI]

    Swing Options Valuation: a BSDE with Constrained Jumps Approach Marie Bernhart Huy^en Pham Peter Tankov Xavier Warin§ January 7, 2011 Abstract We introduce a new probabilistic method for solving a class (BSDEs for short) with constrained jumps. As an example, our method is used for pricing Swing options. We

  1. Finance 2nd Option Worksheet 2010 -2012 Name: Date: UNOFFICIAL

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Finance 2nd Option Worksheet 2010 - 2012 Name: Date: UNOFFICIAL Fall Credits Spring Credits ECNS 3 Spring only BFIN 456 Entrp Finance 3 Fall/Spring BFIN 452 Int'l Finance 3 Spring only BFIN 466/2012 Senior-Level Option Courses Finance Restricted Electives (9 crds required) Form can be found online

  2. Finance 2nd Option Worksheet 2012 -2014 Name: Date: UNOFFICIAL

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Finance 2nd Option Worksheet 2012 - 2014 Name: Date: UNOFFICIAL Fall Credits Spring Credits ECNS 3 Spring only BFIN 456 Entrp Finance 3 Fall/Spring BFIN 452 Int'l Finance 3 Spring only BFIN 466/2012 Senior-Level Option Courses Finance Restricted Electives (9 crds required) Form can be found online

  3. Equilibrium pricing bounds on option prices Marie Chazala

    E-Print Network [OSTI]

    Boyer, Edmond

    probability measure that is equivalent to the historical one, and under which the discounted price processesEquilibrium pricing bounds on option prices Marie Chazala and Ely`es Jouinib a CREST, France price at maturity, we derive an upper bound on the call option price by putting two kind of restrictions

  4. Valuation and Optimal Exercise Strategy of Electricity Swing Options.

    E-Print Network [OSTI]

    Dalang, Robert C.

    Valuation and Optimal Exercise Strategy of Electricity Swing Options. Gido Haarbrücker, Daniel Kuhn plateforme de recherche Alexandria https://www.alexandria.unisg.ch | 04.02.2014 Electricity swing options https://www.alexandria.unisg.ch | 04.02.2014 mot-clé energy, derivative pricing, electricity swing

  5. ICORE: Image Co-addition with Optional Resolution Enhancement

    E-Print Network [OSTI]

    Masci, Frank

    Masci * Implemented QA plot files. * Included ­wf option to control inverse variance weighting. When on. There is no warranty that the software described herein is free of bugs. This includes proper graceful program WCS and distortion keys). * Implemented auto-tiling option to support memory management for outlier

  6. Emploi du temps Licence de Mathmatiques semestre 6 MA= parcours maths approfondies M= parcours maths MI= parcours math-info ( groupe C en LI2)

    E-Print Network [OSTI]

    Berger, Clemens

    M= parcours maths MI= parcours math-info ( groupe C en LI2) 08h00-09h30 09h45-11h15 11h30-13h00 13h15-14h45 15h00-16h30 16h45-18h15 lundi MA MA M M MI MI mardi MA Anglais MA M TD Histoire des Maths M 3.2 M MI Anglais MI mercredi MA TD Variable Complexe M 3.2 MA M M MI MI jeudi MA MA M M MI MI

  7. Emploi du temps Licence de Mathmatiques semestre 6 MA= parcours maths approfondies M= parcours maths MI= parcours math-info ( groupe A en LI2)

    E-Print Network [OSTI]

    Parusinski, Adam

    M= parcours maths MI= parcours math-info ( groupe A en LI2) 08h00-09h30 09h45-11h15 11h30-13h00 13h15-14h45 15h00-16h30 16h45-18h15 lundi MA MA M Anglais* M MI TP Programmation C PV202 MI mardi MA Anglais MA M TD Histoire des Maths M 3.2 M MI TP Projet Scientifique PV214 MI mercredi MA TD Variable

  8. NANA Strategic Energy Plan & Energy Options Analysis

    SciTech Connect (OSTI)

    Jay Hermanson; Brian Yanity

    2008-12-31T23:59:59.000Z

    NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authority’s state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: • Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine. • Biomass Feasibility analysis in the upper Kobuk; • Run of the river hydroelectric development for the Upper Kobuk; • Solar photovoltaic (PV) power demonstration projects for Noatak, Ambler, Selawik, Kiana, and Noorvik; • Heat Recovery for several communities; In September 2008, the NRC team participated at the Alaska Rural Energy Conference in Girdwood, Alaska In November 2008, the NRC team gave a presentation on the NANA regional energy plans at a DOE Tribal Energy Program conference in Denver, Colorado. In January 2009, the final SEP report was submitted to NRC.

  9. An option of "UCN pump" for ESS

    E-Print Network [OSTI]

    Nesvizhevsky, Valery V

    2014-01-01T23:59:59.000Z

    The aim of this short note is to present an option for a source of ultracold neutrons (UCNs), which could profit from the pulse time-structure of the future ESS spallation neutron source in Lund, and thus which could produce a very high UCN density and a rather high UCN flux simultaneously. In order to realize this idea one has to install a relatively thin solid-deuterium UCN source in a close vicinity to the spallation target and to couple it with an extraction UCN guide with an entrance membrane window, which is moving periodically and synchronously with the operation cycle of the spallation source, as explained in the text below. This proposal profits from the fact that all characteristic parameters of the problem, such as the pulse duration of the ESS spallation source, the typical thickness of solid deuterium source that could be easily realized, the typical time of generation of UCNs in solid deuterium, the length and diameter of the extraction neutron guide and the time diagram of the membrane motion t...

  10. Evaluation of passive solar retrofit options

    SciTech Connect (OSTI)

    Ben-David, S.; Kirchemen, C.; Martin, S.; Noll, S.; Roach, F.

    1980-01-01T23:59:59.000Z

    An evaluation framework has been developed which allows for the assessment of the role of passive solar retrofit in the nationwide reduction of conventional fuel use. Three types of analysis are proposed within this framework: the physical/technical capability of the present housing stock to incorporate passive solar retrofit; the economic feasibility of the application of retrofit designs; and the actual market potential or acceptance of these alternative retrofit options. Each type of analysis has specific data requirements and a series of evaluation procedures to help establish estimates of the potential for passive solar retrofit in the present housing stock. The data requirements with their respective sources and evaluation procedures for the first two types of analysis-physical/technical setting and economic feasibility, are examined. A distinction is drawn between community specific case studies and more generalized national assessments. Information derived from these three types of analysis, whether case specific or national in scope, can then be used in an evaluation of potential economic impacts. The establishment of regional economic benefits and costs werve as a measure of the merit or attractiveness of the implementation of a passive solar retrofit program.

  11. ENVIROCARE OF UTAH: EXPANDING WASTE ACCEPTANCE CRITERIA TO PROVIDE LOW-LEVEL AND MIXED WASTE DISPOSAL OPTIONS

    SciTech Connect (OSTI)

    Rogers, B.; Loveland, K.

    2003-02-27T23:59:59.000Z

    Envirocare of Utah operates a low-level radioactive waste disposal facility 80 miles west of Salt Lake City in Clive, Utah. Accepted waste types includes NORM, 11e2 byproduct material, Class A low-level waste, and mixed waste. Since 1988, Envirocare has offered disposal options for environmental restoration waste for both government and commercial remediation projects. Annual waste receipts exceed 12 million cubic feet. The waste acceptance criteria (WAC) for the Envirocare facility have significantly expanded to accommodate the changing needs of restoration projects and waste generators since its inception, including acceptable physical waste forms, radiological acceptance criteria, RCRA requirements and treatment capabilities, PCB acceptance, and liquids acceptance. Additionally, there are many packaging, transportation, and waste management options for waste streams acceptable at Envirocare. Many subcontracting vehicles are also available to waste generators for both government and commercial activities.

  12. YUCCA MOUNTAIN PROJECT - A BRIEFING --

    SciTech Connect (OSTI)

    NA

    2003-08-05T23:59:59.000Z

    This report has the following articles: Nuclear waste--a long-term national problem; Spent nuclear fuel; High-level radioactive waste; Radioactivity and the environment; Current storage methods; Disposal options; U.S. policy on nuclear waste; The focus on Yucca Mountain; The purpose and scope of the Yucca Mountain Project; The approach for permanently disposing of waste; The scientific studies at Yucca Mountain; The proposed design for a repository at Yucca Mountain; Natural and engineered barriers would work together to isolate waste; Meticulous science and technology to protect people and the environment; Licensing a repository; Transporting waste to a permanent repository; The Environmental Impact Statement for a repository; Current status of the Yucca Mountain Project; and Further information available on the Internet.

  13. The institutional needs of joint implementation projects

    SciTech Connect (OSTI)

    Watt, E.; Sathaye, J. [Lawrence Berkeley Lab., CA (United States); Buen, O. de; Masera, O. [National Univ. of Mexico, Mexico City (Mexico); Gelil, I.A. [Organization of Energy Conservation and Planning, Cairo (Egypt); Ravindranath, N.H. [Indian Inst. of Science, Bangalore (India); Zhou, D.; Li, J. [Energy Research Inst., Beijing (China); Intarapravich, D. [Thailand Environmental Inst., Bangkok (Thailand)

    1995-10-21T23:59:59.000Z

    In this paper, the authors discuss options for developing institutions for joint implementation (JI) projects. They focus on the tasks which are unique to JI projects or require additional institutional needs--accepting the project by the host and investor countries and assessing the project`s greenhouse gas (GHG) emission reduction or sequestration--and they suggest the types of institutions that would enhance their performance. The evaluation is based on four sets of governmental and international criteria for JI projects, the experiences of ten pilot JI projects, and the perspectives of seven collaborating authors from China, Egypt, India, Mexico, and Thailand, who interviewed relevant government and non-government staff involved in JI issue assessment in their countries. After examining the roles for potential JI institutions, they present early findings arguing for a decentralized national JI structure, which includes: (1) national governmental panels providing host country acceptance of proposed JI projects; (2) project parties providing the assessment data on the GHG reduction or sequestration for the projects; (3) technical experts calculating these GHG flows; (4) certified verification teams checking the GHG calculations; and (5) members of an international JI Secretariat training and certifying the assessors, as well as resolving challenges to the verifications. 86 refs.

  14. COHERENT LASER VISION SYSTEM (CLVS) OPTION PHASE

    SciTech Connect (OSTI)

    Robert Clark

    1999-11-18T23:59:59.000Z

    The purpose of this research project was to develop a prototype fiber-optic based Coherent Laser Vision System (CLVS) suitable for DOE's EM Robotic program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update the dimensional spatial data on the order of once per second. The system has total immunity to ambient lighting conditions.

  15. Green Building Policy Options for New Orleans

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is adapted from a memo and report delivered to the City Council of New Orleans, the office of the Mayor of New Orleans, the Chairperson of the Citizen Stakeholders Group (New Orleans Energy Task Force) and the U.S. Department of Energy (DOE) Project Officer in 2008. The report outlines ideas for and potential impacts of various green building policies in New Orleans in the years following Hurricane Katrina.

  16. Gnie mcanique avec option Gestion et entrepreneuriat en ingnierie/ Mechanical Engineering with Engineering Management and Entrepreneurship option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie mécanique avec option Gestion et entrepreneuriat en ingénierie/ Mechanical Engineering / Course selection grid 06/05/2013 Bien que les cotes de cours apparaissent dans les deux langues (anglais/4722 (6 cr) MCG4328/4728 Cours au choix de l'option gestion et entrepreneuriat/ Management

  17. Gnie mcanique avec option Gestion et entrepreneuriat en ingnierie/ Mechanical Engineering with Engineering Management and Entrepreneurship option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie mécanique avec option Gestion et entrepreneuriat en ingénierie/ Mechanical Engineering / Course selection grid 29/02/2012 Bien que les cotes de cours apparaissent dans les deux langues (anglais/4722 (6 cr) MCG4328/4728 Cours au choix de l'option gestion et entrepreneuriat/ Management

  18. Master's Degree in Agriculture Plant Health Management Option Option Title: Master of Science (MS) in Agriculture: Plant Health

    E-Print Network [OSTI]

    Collins, Gary S.

    Master's Degree in Agriculture ­ Plant Health Management Option Option Title: Master of Science (MS) in Agriculture: Plant Health Management Department(s) or Program(s): Supported of Agricultural, Human, and Natural Resource Sciences (CAHNRS) Contact Name: Dr. Kim Kidwell, Director MS

  19. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

  20. Energy Strategic Planning & Sufficiency Project

    SciTech Connect (OSTI)

    Retziaff, Greg

    2005-03-30T23:59:59.000Z

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  1. DSpace XML UI Project Technical Overview

    E-Print Network [OSTI]

    Phillips, Scott; Maslov, Alexey; Leggett, John; Mikeal, Adam

    2007-07-16T23:59:59.000Z

    at Texas A&M. Several other schemas were evaluated for decoupling style from semantic information in web-oriented aplications. Existing schemas such as DocBok [2] provide methods of encoding most aspects of a web page, but are lacking elements necesary... for HTML form representation. Therefore, our solution folows DocBok design paterns when aplicable, but deviates when necesary for web- based semantics. The schema used in this project involves thre major elements: meta, body, and options. The meta...

  2. MA 366 Info

    E-Print Network [OSTI]

    I thought that it was more useful to spend additional time on series solutions. Hence, you should ignore problems (11)-(15) on last fall's final and problems ...

  3. Exam #3 Info Sheet

    E-Print Network [OSTI]

    Devlin, Patrick M

    2014-11-14T23:59:59.000Z

    The volume/surface area formulas for a cone, cylinder, and/or sphere will also be ... Lesson 24: (page 206) 51, 84. Lesson 25: (page 206) 39, 40, 50, 57, 59, 60, ...

  4. Newspaper Info Sunday Tribune

    E-Print Network [OSTI]

    Rogers, John A.

    CharityCars.org General Jobs Motors Property Motors (7401) Property (4393) Jobs (4088) Place an Ad Online science and engineering at the University of Illinois. He said the devices are meant to showcase a new way chips. The researchers teamed up with radio frequency electronics engineers at Northrop Grumman Corp

  5. Past Restoration Fund Info

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven AshbyDepartment of Energynalcal.GIFHallAskRates >

  6. XRAYOPS Info Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout SRNL Home SRNL main campusMoreXRAYOPS -- APS Experiment

  7. Invoicing, Payments Info

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area.PortaldefaultIntroducing AuroraInvestor

  8. FMAPropInfoStat

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4:Epitaxial ThinFOR IMMEDIATE RELEASE JimFAQsFESTopg

  9. A Closed-Form Model for Valuing Real Options Using Managerial Cash-Flow Estimates- Draft Abstract for ROC2013 ?

    E-Print Network [OSTI]

    Yuri Lawryshyn

    In this work, we build on a previous real options approach that utilizes managerial cash-flow estimates to value early stage project investments. Through a simplifying assumption, where we assume that the managerial cash-flow estimates are normally distributed, we derive a closedform solution to the real option problem. The model is developed through the introduction of a market sector indicator, which is assumed to be correlated to a tradeable market index, which drives the project’s sales estimates. Another indicator, assumed partially correlated to the sales indicator drives the gross margin percent estimates. In this way we can model a cash-flow process that is partially correlated to a traded market index. This provides the mechanism for valuing real options of the cash-flow in a financially consistent manner under the risk-neutral minimum martingale measure. The method requires minimal subjective input of model parameters and is very easy to implement. We also investigate the sensitivity of the normal distribution assumption by comparing the approach developed here to our previous approach.

  10. Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2

    E-Print Network [OSTI]

    Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

  11. Proceeding of the Hawaii International System Science Conference, January 1999 Combining Financial Double Call Options with Real Options for Early Curtailment of

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Double Call Options with Real Options for Early Curtailment of Electricity Service Shmuel S. Oren that provides a hedge against price risk and reflects the "real options" available to the customer. This paper flexibility by responding to the price signal and exercise its "real option" to reduce consumption when

  12. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  13. Optional Residential Program Benchmarking | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's Impact on Our National-Projects in the United

  14. 07/14/2005 03:15 PMEBSCOhost Page 1 of 9https://sslvpn.pitt.edu/DeliveryPrintSave.asp,DanaInfo=weblinks2.ep...a&ev=CA&fd=&fi=aph_4562569_AN&del_submit=Print&est=&ft=on&ff=s&df=2

    E-Print Network [OSTI]

    Spirtes, Peter

    .pitt.edu/DeliveryPrintSave.asp,DanaInfo=weblinks2.ep...a&ev=CA&fd=&fi=aph_4562569_AN&del_submit=Print&est=&ft=on&ff=s&df=2 11 page://sslvpn.pitt.edu/DeliveryPrintSave.asp,DanaInfo=weblinks2.ep...a&ev=CA&fd=&fi=aph_4562569_AN

  15. PROJECT REQUEST FORM PROJECT HOLDER INFORMATION

    E-Print Network [OSTI]

    de Leon, Alex R.

    PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

  16. Scarcity of Ideas and R&D Options: Use it, Lose it, or Bank it

    E-Print Network [OSTI]

    Erkal, Nisvan; Scotchmer, Suzanne

    2009-01-01T23:59:59.000Z

    Strategic Delay in a Real Options Model of R&D Competition,"ideas; imagination; innovation; real options; search models;low cost. Our model is a real options model in the spirit of

  17. Real Options Valuation of U.S. Federal Renewable Energy Research, Development, Demonstration, and Deployment

    E-Print Network [OSTI]

    Siddiqui, Afzal S.; Marnay, Chris; Wiser, Ryan H.

    2005-01-01T23:59:59.000Z

    N ATIONAL L ABORATORY Real Options Valuation of US FederalBerkeley, 18 March 2005 Real Options Valuation of US Federalabove by developing a real options model of RE RD 3 that

  18. Scarcity of Ideas and R&D Options: Use it, Lose it or Bank it.

    E-Print Network [OSTI]

    Scotchmer, Suzanne; Erkal, Nisvan

    2009-01-01T23:59:59.000Z

    Strategic Delay in a Real Options Model of R&D Competition,"low cost. Our model is a real options model in the spirit ofa value to delay. In many real options models, the value of

  19. Valuing innovative technology R&D as a real option : application to fuel cell vehicles

    E-Print Network [OSTI]

    Tsui, Maggie

    2005-01-01T23:59:59.000Z

    This thesis aims to elucidate real option thinking and real option valuation techniques for innovative technology investment. Treating the fuel cell R&D investment as a real option for General Motor's light passenger vehicle ...

  20. For Immediate Release --Wednesday, September 24, 2014 University of Lethbridge unveils three options for new

    E-Print Network [OSTI]

    Hossain, Shahadat

    the design process. In developing the three options, an Integrated Design Planning of Lethbridge unveils three options for new Science and Academic Building, as three building massing options for the new Science and Academic Building were

  1. DESIGN OPTIONS FOR SMALL SCALE SHARED MEMORY MULTIPROCESSORS

    E-Print Network [OSTI]

    Barroso, Luiz André

    i DESIGN OPTIONS FOR SMALL SCALE SHARED MEMORY MULTIPROCESSORS by Luiz André Barroso Copyright 1996 Luiz André Barroso #12;ii to Jacqueline Chame #12;iii Acknowledgments During my stay at USC I

  2. Mandatory Green Power Option for Large Municipal Utilities

    Broader source: Energy.gov [DOE]

    Municipal electric utilities serving more than 40,000 customers in Colorado must offer an optional green-power program that allows retail customers the choice of supporting emerging renewable...

  3. Application of real options to reverse logistics process

    E-Print Network [OSTI]

    Kaga, Akihiro, 1975-

    2004-01-01T23:59:59.000Z

    In this thesis, real options are used to identify the optimal model for the reverse logistics process of a technology company in the circuit board business. Currently, customers return defective boards and the company ...

  4. Extensions of Lo's semiparametric bound for European call options

    E-Print Network [OSTI]

    2006-01-19T23:59:59.000Z

    Jan 19, 2006 ... call option, given up to third-order moment information on the underly- ing asset ...... Assume p(s) has real roots r1 ? r2 ? r3. If a3 > 0 then p(s) ...

  5. An Analysis of Steam Process Heater Condensate Drainage Options

    E-Print Network [OSTI]

    Risko, J. R.

    The production and reliability performance of Steam Process Heaters can be significantly affected by the condensate drainage design that is employed. There are currently a variety of drainage options which can be confusing to a system designer who...

  6. Early Draft Energy Policy and Financing Options to

    E-Print Network [OSTI]

    .................................................................................................................. 6 3. HIDDEN BENEFITS OF SOLAR ENERGYEarly Draft Energy Policy and Financing Options to Achieve Solar Penetration Targets: Accounting the costs both of solar technology and of grid integration, so enabling solar deployment nationwide

  7. Microsoft Word - Draft Option Mod Oct - Dec 2011 rev 1

    National Nuclear Security Administration (NNSA)

    2006 to December 31, 2011, may be for period(s) from three months to five years. The Contracting Officer will determine the duration of these option period(s) at the time of...

  8. Local Option- Property Tax Credit for High Performance Buildings

    Broader source: Energy.gov [DOE]

    Similar to Maryland's [http://www.dsireusa.org/library/includes/incentive2.cfm?Incentive_Code=M... Local Option Property Tax Credit for Renewable Energy], Title 9 of Maryland's property tax code...

  9. Robust option pricing : An [epsilon]-arbitrage approach

    E-Print Network [OSTI]

    Chen, Si, S.M. Massachusetts Institute of Technology

    2009-01-01T23:59:59.000Z

    This research aims to provide tractable approaches to price options using robust optimization. The pricing problem is reduced to a problem of identifying the replicating portfolio which minimizes the worst case arbitrage ...

  10. Female Scientists, Engineers Open Students' Eyes to Career Options

    Broader source: Energy.gov [DOE]

    More than six dozen middle school girls visited INL to learn about career options in science and engineering at the annual My Amazing Future event organized by Idaho Women in Nuclear.

  11. The Minimum Assumed Incentive Effect of Executive Share Options 

    E-Print Network [OSTI]

    Main, Brian G M; Skovoroda, Rodion; Buck, Trevor; Bruce, Alistair

    2003-01-01T23:59:59.000Z

    In granting executive share options (ESOs), companies hand over financial assets to the executive at an opportunity cost that generally outweighs the value placed on those assets by the executive on the receiving end. This ...

  12. Platforms and real options in large-scale engineering systems

    E-Print Network [OSTI]

    Kalligeros, Konstantinos C., 1976-

    2006-01-01T23:59:59.000Z

    This thesis introduces a framework and two methodologies that enable engineering management teams to assess the value of real options in programs of large-scale, partially standardized systems implemented a few times over ...

  13. A New Spectral Element Method for Pricing European Options ...

    E-Print Network [OSTI]

    2013-01-02T23:59:59.000Z

    Nov 11, 2011 ... Springer Science+Business Media, LLC (outside the USA) 2011 ...... Carr, P., Madan, D.B., Smith, R.H.: Option valuation using the fast Fourier ...

  14. Building America Expert Meeting: Windows Options for New and...

    Broader source: Energy.gov (indexed) [DOE]

    The NorthernSTAR Building America Partnership held an Expert Meeting on Windows Options for New and Existing Homes on November 14, 2011 at the Nolte Building on the campus of the...

  15. Required and Optional Metadata | Scientific and Technical Information...

    Office of Scientific and Technical Information (OSTI)

    and Optional Metadata Print page Print page Metadata Provided to OSTI via AN 241.1 Web Metadata Provided to OSTI via Harvesting Metadata Provided to OSTI via Batch Upload...

  16. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  17. China-Assessing Policy Options for Increasing the Use of Renewable...

    Open Energy Info (EERE)

    Policy Options for Increasing the Use of Renewable Energy for Sustainable Development Jump to: navigation, search Name China-Assessing Policy Options for Increasing the Use of...

  18. Carbon Tariffs Revisited The Harvard Project on Climate Agreements

    E-Print Network [OSTI]

    Liu, X. Shirley

    pragmatic public policy options for addressing global climate change. Drawing upon leading thinkers in Argentina, Australia, China, Europe, India, Japan, and the United States, the Project conducts research on policy architecture, key design elements, and institutional dimensions of domestic climate policy

  19. RP-5 RENEWABLE ENERGY PROJECT

    SciTech Connect (OSTI)

    Neil Clifton, P.E.; Eliza Jane Whitman; Jamal A. Zughbi, P.E.

    2002-10-30T23:59:59.000Z

    This report is the first quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of July 12, 2002 (project inception) to September 30, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted to identify and analyze potential renewable energy technologies and verify its feasibility and suitability for the project. The report covers the two-day Energy Charrette that was held at the Inland Empire Utilities Agency (IEUA) Headquarters Building on May 8-9, 2002 to brainstorm, evaluate and present all available renewable energy options along with their implementations. Although the Energy Charrette was held prior to awarding of the DOE Grant, the outcome of the Charrette forms the basis of the activities that took place after July 12, 2002. Therefore, the Energy Charrette is frequently referenced and discussed in this report. The report also discusses the Energy Meeting that took place on September 24, 2002 between IEUA and CH2M Hill to follow up on the various presentations and recommendations resulting from the Energy Charrette. It should be noted that no final equipment data or capacities have been presented in the report, as the Conceptual Design has not started yet. This report covers continuing effort and work to complete the Request for Proposal (RFP) for this project. The Executive Summary Section covers more details on the scope of work, which consists of the conceptual, preliminary and final design, and what has been accomplished during the report period. Tools and methods utilized in this project to identify renewable energy technologies are included in the ''Experimental'' Section. Finally, Project achievements, implications and importance in improving this kind of technology are summarized in the ''Conclusion'' Section.

  20. Spcialis approfondi en informatique, option gestion et entrepreneuriat / Honours with Specialization in Computer Science, Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Spécialisé approfondi en informatique, option gestion et entrepreneuriat / Honours/3719, ADM3326/3726, GNG4170/4570 et PHI2397/2797 Bien que les cotes de cours apparaissent dans les deux

  1. Real option analysis of flexibility in a hospital emergency department expansion project : a systems approach

    E-Print Network [OSTI]

    Maseda, Luis J

    2008-01-01T23:59:59.000Z

    Hospital Emergency Departments across the United States have been experiencing demand in excess of their capacity to treat patients for the last two decades. This research considers a hypothetical case inspired by a hospital ...

  2. Flushing sprawl down the drain : is TIF an option for Vermont growth center wastewater projects?

    E-Print Network [OSTI]

    Markarian, Molly E. (Molly Elizabeth)

    2007-01-01T23:59:59.000Z

    In keeping with a long history of striving to preserve its traditional settlement pattern and promote smart growth, Vermont's most recent growth management policies encourage municipalities to plan for and accommodate ...

  3. A Tool for the Analysis of Real Options in Sustainability Improvement Projects

    E-Print Network [OSTI]

    Boonchanta, Napon

    2012-10-19T23:59:59.000Z

    NREL National Renewable Energy Laboratory O&M Operation and Maintenance PV Photovoltaic (refers to photovoltaic or solar energy system) U.S. DOE U.S. Department Of Energy U.S. EIA U.S. Energy Information Administration USGBC U.S. Green Building... detail .................................................................................... 55 9 PV system sizing assumptions and calculation ................................................ 62 10 Model parameters and input...

  4. BPA, Transmission, I-5 Corridor Reinforcement Project, Alternatives and Options map, May 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents 12 BONNEVILLE POWER57B

  5. INTERNATIONAL OSTEOPOROSIS FOUNDATION RUE JUSTE-OLIVIER, 9 CH-1260 NYON SWITZERLAND T +41 22 994 01 00 F +41 22 994 01 01 INFO@IOFBONEHEALTH.ORG WWW.IOFBONEHEALTH.ORG

    E-Print Network [OSTI]

    Shihadeh, Alan

    INTERNATIONAL OSTEOPOROSIS FOUNDATION RUE JUSTE-OLIVIER, 9 · CH-1260 NYON · SWITZERLAND T +41 22 994 01 00 · F +41 22 994 01 01 · INFO@IOFBONEHEALTH.ORG · WWW.IOFBONEHEALTH.ORG OSTEOPOROSIS woman' released for World Osteoporosis Day shows urgent action must be taken to safeguard the quality

  6. Gschwind Benot, Lionel Mnard, Thierry Ranchin, Lucien Wald, Paul Stackhouse, 2007. A proposal for a thesaurus for web services in solar radiation. In Proceedings EnviroInfo 2007, O. Hryniewicz, J. Studzinski and M. Romaniuk (Eds), Shaker Verlag,

    E-Print Network [OSTI]

    Boyer, Edmond

    for a thesaurus for web services in solar radiation. In Proceedings EnviroInfo 2007, O. Hryniewicz, J. Studzinski in Solar Radiation Benoît Gschwind1 , Lionel Ménard1 , Thierry Ranchin1 , Lucien Wald1 and Paul Stackhouse2 energies. This communication focuses on solar energy and more specifically on aspects in solar radiation

  7. Scientific Systems Company, Inc. 500 West Cummings Park, Suite 3000, Woburn, MA 01801, USA Tel: (781) 933-5355 Fax: (781) 938-4752 Email: info@ssci.com

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    Scientific Systems Company, Inc. 500 West Cummings Park, Suite 3000, Woburn, MA 01801, USA Tel. Founded in 1976 and headquartered in the metro-Boston area, SSCI has built a reputation for delivering Park, Suite 3000, Woburn, MA 01801, USA Tel: (781) 933-5355 Fax: (781) 938-4752 Email: info

  8. Design options for a bunsen reactor.

    SciTech Connect (OSTI)

    Moore, Robert Charles

    2013-10-01T23:59:59.000Z

    This work is being performed for Matt Channon Consulting as part of the Sandia National Laboratories New Mexico Small Business Assistance Program (NMSBA). Matt Channon Consulting has requested Sandia's assistance in the design of a chemical Bunsen reactor for the reaction of SO2, I2 and H2O to produce H2SO4 and HI with a SO2 feed rate to the reactor of 50 kg/hour. Based on this value, an assumed reactor efficiency of 33%, and kinetic data from the literature, a plug flow reactor approximately 1%E2%80%9D diameter and and 12 inches long would be needed to meet the specification of the project. Because the Bunsen reaction is exothermic, heat in the amount of approximately 128,000 kJ/hr would need to be removed using a cooling jacket placed around the tubular reactor. The available literature information on Bunsen reactor design and operation, certain support equipment needed for process operation and a design that meet the specification of Matt Channon Consulting are presented.

  9. PROJECT GOALS To establish a Carbon Offset Fund that will strategically

    E-Print Network [OSTI]

    PROJECT GOALS To establish a Carbon Offset Fund that will strategically invest in projects options, developments in the National Greenhouse and Energy Reporting System, National Carbon Off-Set emissions through the Carbon Off-Set Fund. This is an opportunity for Australia's national university to set

  10. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

  11. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

  12. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

  13. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

  14. Part II: Project Summaries Project Summaries

    E-Print Network [OSTI]

    Perkins, Richard A.

    Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

  15. Fulfilling the Hypermedia Constraint Via HTTP OPTIONS, the HTTP Vocabulary In RDF, And Link Headers

    E-Print Network [OSTI]

    Tomkins, Andrew

    @lsi.upc.edu Jan Algermissen NORD Software Consulting KriemhildstraÃ?e 7 22559 Hamburg info@nordsc.com ABSTRACT One http://roy.gbiv.com/untangled/2008/rest-apis- must-be-hypertext-driven anchors within a media stream

  16. Project Management Practices

    Energy Savers [EERE]

    on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

  17. PROCEDURES FOR ARC PROJECTS

    E-Print Network [OSTI]

    Collins, Gary S.

    PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

  18. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect (OSTI)

    Keith, Raymond E.

    1991-10-01T23:59:59.000Z

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  19. Reviving Magnet Schools: Strengthening a Successful Choice Option

    E-Print Network [OSTI]

    Siegel-Hawley, Genevieve; Frankenberg, Erica

    2012-01-01T23:59:59.000Z

    Graduation in the Los Angeles Unified School District? Santa Barbara: California Dropout Research Project,

  20. Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station

    SciTech Connect (OSTI)

    John Pavlish; Jeffrey Thompson; Christopher Martin; Mark Musich; Lucinda Hamre

    2009-01-07T23:59:59.000Z

    The primary objective of the project was to evaluate the long-term feasibility of using activated carbon injection (ACI) options to effectively reduce mercury emissions from Texas electric generation plants in which a blend of lignite and subbituminous coal is fired. Field testing of ACI options was performed on one-quarter of Unit 2 at TXU's Big Brown Steam Electric Station. Unit 2 has a design output of 600 MW and burns a blend of 70% Texas Gulf Coast lignite and 30% subbituminous Powder River Basin coal. Big Brown employs a COHPAC configuration, i.e., high air-to-cloth baghouses following cold-side electrostatic precipitators (ESPs), for particulate control. When sorbent injection is added between the ESP and the baghouse, the combined technology is referred to as TOXECON{trademark} and is patented by the Electric Power Research Institute in the United States. Key benefits of the TOXECON configuration include better mass transfer characteristics of a fabric filter compared to an ESP for mercury capture and contamination of only a small percentage of the fly ash with AC. The field testing consisted of a baseline sampling period, a parametric screening of three sorbent injection options, and a month long test with a single mercury control technology. During the baseline sampling, native mercury removal was observed to be less than 10%. Parametric testing was conducted for three sorbent injection options: injection of standard AC alone; injection of an EERC sorbent enhancement additive, SEA4, with ACI; and injection of an EERC enhanced AC. Injection rates were determined for all of the options to achieve the minimum target of 55% mercury removal as well as for higher removals approaching 90%. Some of the higher injection rates were not sustainable because of increased differential pressure across the test baghouse module. After completion of the parametric testing, a month long test was conducted using the enhanced AC at a nominal rate of 1.5 lb/Macf. During the time that enhanced AC was injected, the average mercury removal for the month long test was approximately 74% across the test baghouse module. ACI was interrupted frequently during the month long test because the test baghouse module was bypassed frequently to relieve differential pressure. The high air-to-cloth ratio of operations at this unit results in significant differential pressure, and thus there was little operating margin before encountering differential pressure limits, especially at high loads. This limited the use of sorbent injection as the added material contributes to the overall differential pressure. This finding limits sustainable injection of AC without appropriate modifications to the plant or its operations. Handling and storage issues were observed for the TOXECON ash-AC mixture. Malfunctioning equipment led to baghouse dust hopper plugging, and storage of the stagnant material at flue gas temperatures resulted in self-heating and ignition of the AC in the ash. In the hoppers that worked properly, no such problems were reported. Economics of mercury control at Big Brown were estimated for as-tested scenarios and scenarios incorporating changes to allow sustainable operation. This project was funded under the U.S. Department of Energy National Energy Technology Laboratory project entitled 'Large-Scale Mercury Control Technology Field Testing Program--Phase II'.

  1. Perturbation Expansion for Option Pricing with Stochastic Volatility

    E-Print Network [OSTI]

    Petr Jizba; Hagen Kleinert; Patrick Haener

    2007-08-22T23:59:59.000Z

    We fit the volatility fluctuations of the S&P 500 index well by a Chi distribution, and the distribution of log-returns by a corresponding superposition of Gaussian distributions. The Fourier transform of this is, remarkably, of the Tsallis type. An option pricing formula is derived from the same superposition of Black-Scholes expressions. An explicit analytic formula is deduced from a perturbation expansion around a Black-Scholes formula with the mean volatility. The expansion has two parts. The first takes into account the non-Gaussian character of the stock-fluctuations and is organized by powers of the excess kurtosis, the second is contract based, and is organized by the moments of moneyness of the option. With this expansion we show that for the Dow Jones Euro Stoxx 50 option data, a Delta-hedging strategy is close to being optimal.

  2. Nuclear Power Options Viability Study. Volume 4. Bibliography

    SciTech Connect (OSTI)

    Trauger, D.B.; White, J.D.; Sims, J.W. (eds.)

    1986-09-01T23:59:59.000Z

    Documents in the Nuclear Power Options Viability Study (NPOVS) bibliography are classified under one of four headings or categories as follows: nuclear options; light water reactors; liquid metal reactors; and high temperature reactors. The collection and selection of these documents, beginning early in 1984 and continuing through March of 1986, was carried out in support of the study's objective: to explore the viabilities of several nuclear electric power generation options for commercial deployment in the United States between 2000 and 2010. There are approximately 550 articles, papers, reports, and books in the bibliography that have been selected from some 2000 surveyed. The citations have been made computer accessible to facilitate rapid on-line retrieval by keyword, author, corporate author, title, journal name, or document number.

  3. Radioisotope Stirling Generator Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01T23:59:59.000Z

    The preceding paper described conceptual designs and analytical results for five Radioisotope Thermoelectric Generator (RTG) options for the Pluto Fast Flyby (PFF) mission, and the present paper describes three Radioisotope Stirling Generator (RSG) options for the same mission. The RSG options are based on essentially the same radioisotope heat source modules used in previously flown RTGs and on designs and analyses of a 75-watt free-piston Stirling engine produced by Mechanical Technology Incorporated (MTI) for NASA's Lewis Research Center. The integrated system design options presented were generated in a Fairchild Space study sponsored by the Department of Energy's Office of Special Applications, in support of ongoing PFF mission and spacecraft studies that the Jet Propulsion Laboratory (JPL) is conducting for the National Aeronautics and Space Administration (NASA). That study's NASA-directed goal is to reduce the spacecraft mass from its baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for a power source able to deliver 69 watts(e) at the end of the 9.2-year mission. In general, the Stirling options were found to be lighter than the thermoelectric options described in the preceding paper. But they are less mature, requiring more development, and entailing greater programmatic risk. The Stirling power system mass ranged from 7.3 kg (well below the 10-kg goal) for a non-redundant system to 11.3 kg for a redundant system able to maintain full power if one of its engines fails. In fact, the latter system could deliver as much as 115 watts(e) if desired by the mission planners. There are 5 copies in the file.

  4. Project X with Rapid Cycling and Dual Storage Superconducting Synchrotrons

    E-Print Network [OSTI]

    Piekarz, Henryk

    2012-01-01T23:59:59.000Z

    Investigation of neutrino oscillations and rare meson decays are main physics goals of Project X. The successful physics outcome relies on the feasibility of high-intensity neutrino and meson (K+ and \\mu) beams. In order to meet this goal we propose accelerator system dominated by the synchrotrons (Option A) as a technologically easier and significantly more cost-effective alternative to the accelerator system dominated by the linear accelerators (Option B). The synchrotron-based accelerator system and its main components are outlined and the expected proton beam power for the neutrino and meson beams production is presented and discussed.

  5. Is Entombment an Acceptable Option for Decommissioning? An International Perspective - 13488

    SciTech Connect (OSTI)

    Belencan, Helen [US Department of Energy (United States)] [US Department of Energy (United States); Nys, Vincent [Federal Agency for Nuclear Control (Belgium)] [Federal Agency for Nuclear Control (Belgium); Guskov, Andrey [Scientific and Engineering Centre on Safety in Nuclear Energy (United States)] [Scientific and Engineering Centre on Safety in Nuclear Energy (United States); Francois, Patrice [Institut de radioprotection et de surete nucleaire (France)] [Institut de radioprotection et de surete nucleaire (France); Watson, Bruce [US Nuclear Regulatory Commission (United States)] [US Nuclear Regulatory Commission (United States); Ljubenov, Vladan [International Atomic Energy Agency (Austria)] [International Atomic Energy Agency (Austria)

    2013-07-01T23:59:59.000Z

    Selection of a decommissioning strategy is one of the key steps in the preparation for decommissioning of nuclear facilities and other facilities using radioactive material. Approaches being implemented or considered by Member States include immediate dismantling, deferred dismantling and entombment. Other options or slight modifications of these strategies are also possible. Entombment has been identified in the current International Atomic Energy Agency (IAEA) Safety Standards as one of the three basic decommissioning strategies and has been defined as a decommissioning strategy by which radioactive contaminants are encased in a structurally long lived material until radioactivity decays to a level permitting the unrestricted release of the facility, or release with restrictions imposed by the regulatory body. Although all three strategies have been considered, in principle, applicable to all facilities, their application to some facilities may not be appropriate owing to political concerns, safety or environmental requirements, technical considerations, local conditions or financial considerations. The IAEA is currently revising the decommissioning Safety Standards and one of the issues widely discussed has been the applicability of entombment in the context of decommissioning and its general objective to enable removal of regulatory control from the decommissioned facility. The IAEA recently established a consultancy to collect and discuss experience and lessons learned from entombment projects, to identify regulatory requirements and expectations for applying entombment as a decommissioning option strategy, in compliance with the internationally agreed standards. (authors)

  6. Impact of Nuclear Energy Futures on Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Dixon, B.W.; Piet, S.J.

    2004-10-03T23:59:59.000Z

    The Nuclear Waste Policy Act requires the Secretary of Energy to inform Congress before 2010 on the need for a second geologic repository for spent nuclear fuel. By that time, the spent fuel discharged from current commercial reactors will exceed the statutory limit of the first repository. There are several approaches to eliminate the need for another repository in this century. This paper presents a high-level analysis of these spent fuel management options in the context of a full range of possible nuclear energy futures. The analysis indicates the best option to implement varies depending on the nuclear energy future selected.

  7. The Farm Credit Crisis: Policy Options and Consequences.

    E-Print Network [OSTI]

    Duncan, Marvin; Harrington, David H.; Brake, John; Boehlje, Michael; Lee, Warren; Barry, Peter J.; Penson, John B.; Hughes, Dean W.; Knutson, Ronald D.: Richardson, James W.; Jolly, Robert W.; Lins, David A.; Klinefelter, Danny A.; Guither, Harold D.; Marshall, J. Paxton; Barkley, Paul W.

    1986-01-01T23:59:59.000Z

    IUU\\,., Z TA245.7 8873 NO.1532 8-1532 ~ Texas Agricultural Extension Service -P~fJ& 1I~tA!/ P~fJ& --------=-. ------- Ifhe Farm Credit Crisis: Policy Opt~ons and ,Consequences LI3RAnv APR 181986 -l~ ? '. University Texas Agricultural... to the need for a comprehensive documentation of the broad spectrum of policy options available to deal with the farm credit crisis. Emphasis is placed upon a description of options and their consequences. The topics covered in the articles were...

  8. EVALUATION OF TRANSPORTATION OPTIONS FOR INTERMEDIATE NON DESTRUCTIVE EXAMINATIONS

    SciTech Connect (OSTI)

    Case, Susan; Hoggard, Gary

    2014-07-01T23:59:59.000Z

    Idaho National Laboratory (INL) shipments of irradiated experiments from the Advanced Test Reactor (ATR) to the Hot Fuels Examination Facility (HFEF) have historically been accomplished using the General Electric Model 2000 (GE 2000) Type B shipping container. Battelle Energy Alliance (BEA) concerns regarding the future availability and leasing and handling costs associated with the GE 2000 cask have warranted an evaluation of alternative shipping options. One or more of these shipping options may be utilized to perform non destructive examinations (NDE) such as neutron radiography and precision gamma scans of irradiated experiments at HFEF and then return the experiments to ATR for further irradiation, hereafter referred to as “intermediate NDE.”

  9. 9/18/09 2:44 PMThunderbolts Forum View topic -Dark Energy may not actually exist Page 1 of 12http://www.thunderbolts.info/forum/phpBB3/viewtopic.php?p=25303&sid=87fbf6c3a5361ee50b143431ee0e553d

    E-Print Network [OSTI]

    Temple, Blake

    http://www.thunderbolts.info/forum/phpBB3/viewtopic.php?p=25303&sid=87fbf6c3a5361ee50b143431ee0e553d of 12http://www.thunderbolts.info/forum/phpBB3/viewtopic.php?p=25303&sid=87fbf6c3a5361ee50b143431ee0e553 Forum · View topic - Dark Energy may not actually exist Page 3 of 12http://www.thunderbolts.info/forum/php

  10. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05T23:59:59.000Z

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  11. Windy Gap Firming Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

  12. Perspectives on Project Finance

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

  13. NSTX Upgrade Project Project Execution Plan

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

  14. NSTX Upgrade Project Project Execution Plan

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

  15. CIMI PROJECT LONG TERM THEMATIC PROJECT

    E-Print Network [OSTI]

    Ledoux, Michel

    thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

  16. Livingston Solar Canopy Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    ,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

  17. Information Visualization Graduate Project (Group Project)

    E-Print Network [OSTI]

    Rusu, Adrian

    Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

  18. Project Title Project Sponsor (funding agency)

    E-Print Network [OSTI]

    Saskatchewan, University of

    and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

  19. Chopwell Wood Health Project

    E-Print Network [OSTI]

    Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

  20. Sustainability Project Fund Application Form Requirements Project Title

    E-Print Network [OSTI]

    Volesky, Bohumil

    Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

  1. Heat Exchanger Design Options and Tritium Transport Study for the VHTR System

    SciTech Connect (OSTI)

    Chang H. Oh; Eung S. Kim

    2008-09-01T23:59:59.000Z

    This report presents the results of a study conducted to consider heat exchanger options and tritium transport in a very high temperature reactor (VHTR) system for the Next Generation Nuclear Plant Project. The heat exchanger options include types, arrangements, channel patterns in printed circuit heat exchangers (PCHE), coolant flow direction, and pipe configuration in shell-and-tube designs. Study considerations include: three types of heat exchanger designs (PCHE, shell-and-tube, and helical coil); single- and two-stage unit arrangements; counter-current and cross flow configurations; and straight pipes and U-tube designs in shell-and-tube type heat exchangers. Thermal designs and simple stress analyses were performed to estimate the heat exchanger options, and the Finite Element Method was applied for more detailed calculations, especially for PCHE designs. Results of the options study show that the PCHE design has the smallest volume and heat transfer area, resulting in the least tritium permeation and greatest cost savings. It is theoretically the most reliable mechanically, leading to a longer lifetime. The two-stage heat exchanger arrangement appears to be safer and more cost effective. The recommended separation temperature between first and second stages in a serial configuration is 800oC, at which the high temperature unit is about one-half the size of the total heat exchanger core volume. Based on simplified stress analyses, the high temperature unit will need to be replaced two or three times during the plant’s lifetime. Stress analysis results recommend the off-set channel pattern configuration for the PCHE because stress reduction was estimated at up to 50% in this configuration, resulting in a longer lifetime. The tritium transport study resulted in the development of a tritium behavior analysis code using the MATLAB Simulink code. In parallel, the THYTAN code, previously performed by Ohashi and Sherman (2007) on the Peach Bottom data, was revived and verified. The 600 MWt VHTR core input file developed in preparation for the transient tritium analysis of VHTR systems was replaced with the original steady-state inputs for future calculations. A Finite Element Method analysis was performed using COMSOL Multiphysics software to accurately predict tritium permeation through the PCHE type heat exchanger walls. This effort was able to estimate the effective thickness for tritium permeations and develop a correlation for general channel configurations, which found the effective thickness to be much shorter than the average channel distance because of dead spots on the channel side.

  2. On Accurate and Provably Efficient GARCH Option Pricing Algorithms

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    On Accurate and Provably Efficient GARCH Option Pricing Algorithms Yuh-Dauh Lyuu Chi-Ning Wu Abstract The GARCH model has been very successful in capturing the serial corre- lation of asset return tree-based GARCH op- tion pricing algorithms suffer from exponential running time, a cut-off maturity

  3. SHORT-TERM GENERATION ASSET VALUATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Tseng, Chung-Li

    using real options to value power plants with unit commitment constraints over a short-term period. We forward-moving Monte Carlo simulation with backward-moving dynamic programming. We assume that the power significantly overvalue a power plant. With deregulation of the electricity industry a global trend, utilities

  4. ORIGINAL ARTICLE Composting is an effective treatment option for

    E-Print Network [OSTI]

    California at Berkeley, University of

    ORIGINAL ARTICLE Composting is an effective treatment option for sanitization of Phytophthora of California, Berkeley, CA, USA 2 Sonoma Compost, Sonoma, CA, USA 3 McEvoy Ranch, Marin, CA, USA Introduction.1111/j.1365-2672.2006.03008.x Abstract Aims: To determine the effects of heat and composting treatments

  5. National Transportation Policy Options: A Time for Choice

    E-Print Network [OSTI]

    Minnesota, University of

    National Transportation Policy Options: A Time for Choice A white paper for participants of the 2008 James L. Oberstar Forum The Next Authorization: Transforming Transportation Policy? April 6­7, 2008 Minneapolis, Minnesota Sponsored by Center for Transportation Studies University of Minnesota

  6. Assessing Novel Foundation Options for Offshore Wind Turbines

    E-Print Network [OSTI]

    Byrne, Byron

    Assessing Novel Foundation Options for Offshore Wind Turbines B.W. Byrne, BE(Hons), BCom, MA, DPhil G.T. Houlsby, MA, DSc, FREng, FICE Oxford University, UK SYNOPSIS Offshore wind farms of these being the foundations for the offshore turbines. We review here the results of a recent research

  7. Quantum Finance Hamiltonian for Coupon Bond European and Barrier Options

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Quantum Finance Hamiltonian for Coupon Bond European and Barrier Options Belal E. Baaquie RMI are financial derivatives that can be analyzed in the Hamiltonian formulation of quantum finance. Forward-2963 Fax: (65) 6777-6126 Email: phybeb@nus.edu.sg #12;Quantum Finance Hamiltonian for Coupon Bond European

  8. YEAR PALAEOMAGNETISM OPTION 5TH WEEK ENVIRONMENTAL MAGNETISM

    E-Print Network [OSTI]

    Niocaill, Conall Mac

    4TH YEAR ­ PALAEOMAGNETISM OPTION ­ 5TH WEEK ­ ENVIRONMENTAL MAGNETISM Questions to be investigated: 1. What is environmental magnetism? 2. What rock magnetic parameters are used in environmental magnetism? 3. What geologic parameters are contributing to the environmental magnetic signals? 4. How can we

  9. DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS

    E-Print Network [OSTI]

    Bertini, Robert L.

    , VMT fee, data processing, fuel tax alternatives, fee collection center, customer service center 18DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri-based fee collection centers, including the identification of issues related to data transmission, data

  10. RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING

    E-Print Network [OSTI]

    Maranas, Costas

    : 814-863-9958. Fax: 814-865-7846. In the pharmaceutical industry, the optimal management of the newRISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman incorporate a Monte Carlo simulation procedure to a stochastic optimization model (OptFolio) of pharmaceutical

  11. Department of Philosophy -Philosophy Option Checklist 2010 -2012 Catalog

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Department of Philosophy - Philosophy Option Checklist 2010 -2012 Catalog Student: GID #: Students may declare a philosophy major at any time. Please go to the Department Office in 2-155 Wilson Hall Upper-division courses: Required History of Philosophy Courses Semester Grade 1. PHL 361RH History

  12. Department of History and Philosophy Philosophy -Philosophy Option Checklist

    E-Print Network [OSTI]

    Lawrence, Rick L.

    Department of History and Philosophy Philosophy - Philosophy Option Checklist 2012 -2014 Catalog Student: GID #: Students may declare a philosophy major at any time. Please go to the Department Office Grade 1. PHL 236Q, Logic Upper-division courses: Required History of Philosophy Courses Semester Grade 1

  13. DESIGN REQUIREMENTS AND OPTIONS FOR FINAL FOCUSING SUPERCONDUCTING MAGNETS

    E-Print Network [OSTI]

    California at San Diego, University of

    DESIGN REQUIREMENTS AND OPTIONS FOR FINAL FOCUSING SUPERCONDUCTING MAGNETS OF HEAVY-ION DRIVERS L of using both high-temperature superconductors and con- ventional low-temperature superconductors are investi- gated. The use of high-temperature superconducting materials may offer an attractive, although

  14. General Electric Company Evaluation of Sustainable Energy Options

    E-Print Network [OSTI]

    General Electric Company Evaluation of Sustainable Energy Options for the Big Island of Hawaii-West Rd, Post 109 Honolulu, HI 96822 Phone: 808-956-8346 e-mail: rochelea@hawaii.edu General Electric by General Electric Company (GE) as an account of work sponsored by the Hawaii Natural Energy Institute (HNEI

  15. Database Managament IS&M Option Mark Levene

    E-Print Network [OSTI]

    Levene, Mark

    Database Managament IS&M Option Mark Levene Email: m.levene@dcs.bbk.ac.uk Web: http://www.dcs.bbk.ac.uk/~mark/ Lecture Plan 1. Introduction to Databases 2. Data Modelling with the Entity-Relationship Model 3 and Referential Integrity 4. Querying a Relational Database (a) Querying a Single Table (b) Aggregating

  16. SURVEY OF EARNED DOCTORATES (SED) WEB REGISTRATION OPTION

    E-Print Network [OSTI]

    Omiecinski, Curtis

    SURVEY OF EARNED DOCTORATES (SED) WEB REGISTRATION OPTION Congratulations on completing your recipients will now be able to register directly via the web and instantaneously receive a PIN and password about the web survey, please do not hesitate to contact us: 4800-sed@norc.uchicago.edu or 1

  17. Assessment for advanced fuel cycle options in CANDU

    SciTech Connect (OSTI)

    Morreale, A.C.; Luxat, J.C. [McMaster University, 1280 Main St. W. Hamilton, Ontario, L8S 4L7 (Canada); Friedlander, Y. [AMEC-NSS Ltd., 700 University Ave. 4th Floor, Toronto, Ontario, M5G 1X6 (Canada)

    2013-07-01T23:59:59.000Z

    The possible options for advanced fuel cycles in CANDU reactors including actinide burning options and thorium cycles were explored and are feasible options to increase the efficiency of uranium utilization and help close the fuel cycle. The actinide burning TRUMOX approach uses a mixed oxide fuel of reprocessed transuranic actinides from PWR spent fuel blended with natural uranium in the CANDU-900 reactor. This system reduced actinide content by 35% and decreased natural uranium consumption by 24% over a PWR once through cycle. The thorium cycles evaluated used two CANDU-900 units, a generator and a burner unit along with a driver fuel feedstock. The driver fuels included plutonium reprocessed from PWR, from CANDU and low enriched uranium (LEU). All three cycles were effective options and reduced natural uranium consumption over a PWR once through cycle. The LEU driven system saw the largest reduction with a 94% savings while the plutonium driven cycles achieved 75% savings for PWR and 87% for CANDU. The high neutron economy, online fuelling and flexible compact fuel make the CANDU system an ideal reactor platform for many advanced fuel cycles.

  18. 6 options spring '00 understanding adaptation in natural systems

    E-Print Network [OSTI]

    Dieckmann, Ulf

    impacts on biodiversity and ecosystem functioning. Fisheries scientists and mana- gers have increasingly6 options spring '00 understanding adaptation in natural systems Shrinking Cod: Fishery-Induced Change in an Oceanic Stock Fishing is a major source of food and other resources for humankind. Today

  19. Evaluation of Optional Cancellation Contracts using Quantitative Finance Techniques

    E-Print Network [OSTI]

    Zubelli, Jorge Passamani

    market. There are two ways of transporting natural gas: pipelines and liquefied natural gas (LNG). If there is a pipeline available, then it is the cheapest transportation option. LNG is the choice when no pipeline is available. LNG takes up to 1/600th the volume of natural gas. It requires special ships, known as LNG

  20. DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS

    SciTech Connect (OSTI)

    Lobdell, D.; Geimer, R.; Larsen, P.; Loveland, K.

    2003-02-27T23:59:59.000Z

    The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best manage lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.

  1. "THE NUCLEAR OPTION IN GREEK NATIONAL ENERGY POLICY

    E-Print Network [OSTI]

    "THE NUCLEAR OPTION IN GREEK NATIONAL ENERGY POLICY: A RENAISSANCE OR A DJA VUE" by RAPHAEL MOISSIS? · the Commission: · Recognizes the contribution of nuclear energy in CO2 emission reduction. · Underlines of nuclear energy generation is reduced, it is essential that this reduction be phased

  2. On-Going Comparison of Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Piet, S.J.; Bennett, R.G.; Dixon, B.W.; Herring, J.S.; Shropshire, D.E.; Roth, M.; Smith, J.D.; Finck, P.; Hill, R.; Laidler, J.; Pasamehmetoglu, K.

    2004-10-03T23:59:59.000Z

    This paper summarizes the current comprehensive comparison of four major fuel cycle strategies: once-through, thermal recycle, thermal+fast recycle, fast recycle. It then proceeds to summarize comparison of the major technology options for the key elements of the fuel cycle that can implement each of the four strategies - separation processing, transmutation reactors, and fuels.

  3. Phillips Seastar Project: A teamwork approach

    SciTech Connect (OSTI)

    Upchurch, J.L.

    1996-12-31T23:59:59.000Z

    In order to better meet the challenges associated with downsizing and because of the ongoing need to control costs and accelerate project development many companies are trying new and different strategies in managing projects. For the Seastar Project, Phillips adopted a total team approach. The goal of this approach was to develop a win/win attitude for all of the personnel (Phillips, Engineering Contractor and Equipment Vendors) involved in the project. By bringing all the personnel together and focusing on project success it was thought that costs could be better controlled and that the development schedule could be accelerated. The Seastar Project is a two well subsea development located in Garden Banks Blocks 70 and 71 approximately 120 miles south of Cameron Louisiana. Phillips took over operatorship in 1992 and drilled Garden Banks Block 71 No. 2, which discovered 349 feet of net gas pay in April 1993. Following a successful drill stem test on GB 71 No. 2, drilling was started on an appraisal well and work began on a feasibility study to define development options.

  4. Proposed Fidelity Option Line-Up Tier Fund Type Fund Category/Asset Class Proposed Investment Option

    E-Print Network [OSTI]

    Proposed Fidelity Option Line-Up Tier Fund Type Fund Category/Asset Class Proposed Investment Vanguard Inflation Protected Securities U.S. Large Cap Stock Index Fund Vanguard S&P 500 Index Fund U.S. Small/Mid Cap Stock Index Fund Vanguard Extended Market Index Fund International Stock Index Fund

  5. Intel-based iMac, Intel-based Mac mini: How to reset the System Mana... http://docs.info.apple.com/article.html?artnum=303446 1 of 1 7/23/2007 2:16 PM

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    Intel-based iMac, Intel-based Mac mini: How to reset the System Mana... http://docs.info.apple.com/article.html?artnum=303446 1 of 1 7/23/2007 2:16 PM Visit the Apple Store online (1-800-MY-APPLE), visit a retail location on an iMac (Early 2006), iMac (Mid 2006), iMac (Late 2006), or Mac mini (Early 2006): From the Apple menu

  6. LD Didactic GmbH . Leyboldstrasse 1 . D-50354 Huerth / Germany . Phone: (02233) 604-0 . Fax: (02233) 604-222 . e-mail: info@ld-didactic.de Kinetic theory of gases

    E-Print Network [OSTI]

    Allen, Roland E.

    LD LD Didactic GmbH . Leyboldstrasse 1 . D-50354 Huerth / Germany . Phone: (02233) 604-0 . Fax: (02233) 604-222 . e-mail: info@ld-didactic.de P2.5.3.1 Physics Leaflets Heat Kinetic theory of gases of degrees of freedom of the gas molecules: Rf 2 1 CV = (VI) ©by LD Didactic GmbH Printed in the Federal

  7. Hualapai Tribal Utility Development Project

    SciTech Connect (OSTI)

    Hualapai Tribal Nation

    2008-05-25T23:59:59.000Z

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

  8. On-Going Comparison of Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Steven J. Piet; Ralph G. Bennett; Brent W. Dixon; J. Stephen Herring; David E. Shropshire; Mark Roth; J. D. Smith; Robert Hill; James Laidler; Kemal Pasamehmetoglu

    2004-10-01T23:59:59.000Z

    The Advanced Fuel Cycle Initiative (AFCI) program is addressing key issues associated with critical national needs. This paper compares the major options with these major “outcome” objectives - waste geological repository capacity and cost, energy security and sustainability, proliferation resistance, fuel cycle economics, and safety as well as “process” objectives associated with readiness to proceed and adaptability and robustness in the face of uncertainties. Working together, separation, transmutation, and fuel technologies provide complete energy systems that can improve waste management compared to the current “once-through/no separation” approach. Future work will further increase confidence in potential solutions, optimize solutions for the mixtures of objectives, and develop attractive development and deployment paths for selected options. This will allow the nation to address nearer-term issues such as avoiding the need for additional geological repositories while making nuclear energy a more sustainable energy option for the long-term. While the Generation IV Initiative is exploring multiple reactor options for future nuclear energy for both electricity generation and additional applications, the AFCI is assessing fuel cycles options for either a continuation or expansion of nuclear energy in the United States. This report compares strategies and technology options for managing the associated spent fuel. There are four major potential strategies, as follows: · The current U.S. strategy is once through: standard nuclear power plants, standard fuel burnup, direct geological disposal of spent fuel. Variants include higher burnup fuels in water-cooled power plants, once-through gas-cooled power plants, and separation (without recycling) of spent fuel to reduce the number and cost of geological waste packages. · The second strategy is thermal recycle, recycling some fuel components in thermal reactors. This strategy extends the useful life of the geologic repository, producing energy from the fissile transuranics in spent fuel while reducing plutonium. · The third strategy is thermal+fast recycle. The difference from the second strategy is that more components of spent fuel can be recycled to reduce both fissile and non-fissile transuranics, but at the cost of developing and deploying at least one fast reactor or accelerator driven system. A mix of thermal and fast reactors would implement this strategy. · The fourth strategy is pure fast recycle; fuel would not be recycled in thermal reactors, which would be phased out in favor of deploying fast spectrum power reactors.

  9. Project Sponsor Professor Peter

    E-Print Network [OSTI]

    Levi, Ran

    Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

  10. Project Structure Elke Karrenberg

    E-Print Network [OSTI]

    Kaus, Boris

    Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

  11. Energy Efficient Community Development in California: Chula Vista Research Project

    SciTech Connect (OSTI)

    Gas Technology Institute

    2009-03-31T23:59:59.000Z

    In 2007, the U.S. Department of Energy joined the California Energy Commission in funding a project to begin to examine the technical, economic and institutional (policy and regulatory) aspects of energy-efficient community development. That research project was known as the Chula Vista Research Project for the host California community that co-sponsored the initiative. The researches proved that the strategic integration of the selected and economically viable buildings energy efficiency (EE) measures, photovoltaics (PV), distributed generation (DG), and district cooling can produce significant reductions in aggregate energy consumption, peak demand and emissions, compared to the developer/builder's proposed baseline approach. However, the central power plant emission reductions achieved through use of the EE-DG option would increase local air emissions. The electric and natural gas utility infrastructure impacts associated with the use of the EE and EE-PV options were deemed relatively insignificant while use of the EE-DG option would result in a significant reduction of necessary electric distribution facilities to serve a large-scale development project. The results of the Chula Vista project are detailed in three separate documents: (1) Energy-Efficient Community Development in California; Chula Vista Research Project report contains a detailed description of the research effort and findings. This includes the methodologies, and tools used and the analysis of the efficiency, economic and emissions impacts of alternative energy technology and community design options for two development sites. Research topics covered included: (a) Energy supply, demand, and control technologies and related strategies for structures; (b) Application of locally available renewable energy resources including solar thermal and PV technology and on-site power generation with heat recovery; (c) Integration of local energy resources into district energy systems and existing energy utility networks; (d) Alternative land-use design and development options and their impact on energy efficiency and urban runoff, emissions and the heat island effect; and (e) Alternative transportation and mobility options and their impact on local emissions. (2) Creating Energy-Efficient Communities in California: A Reference Guide to Barriers, Solutions and Resources report provides the results of an effort to identify the most innovative existing and emerging public policy, incentive and market mechanisms that encourage investment in advanced energy technologies and enabling community design options in the State of California and the nation. The report evaluates each of these mechanisms in light of the preceding research and concludes with a set of recommended mechanisms designed for consideration by relevant California State agencies, development and finance industry associations, and municipal governments. (3) Creating Energy-Efficient Communities in California: A Technical Reference Guide to Building and Site Design report contains a set of selected commercially viable energy technology and community design options for high-efficiency, low-impact community development in California. It includes a summary of the research findings referenced above and recommendations for energy technology applications and energy-efficient development strategies for residential, commercial and institutional structures and supporting municipal infrastructure for planned communities. The document also identifies design options, technology applications and development strategies that are applicable to urban infill projects.

  12. Part II: Project Summaries Project Summaries

    E-Print Network [OSTI]

    Perkins, Richard A.

    Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

  13. CS348 Project 1 Oracle Project

    E-Print Network [OSTI]

    Elmagarmid, Ahmed K.

    CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

  14. Project Name Project Number Tagging Type

    E-Print Network [OSTI]

    Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

  15. SJSU Information Support Services Run Batch Contracts for Temporary Faculty info-support@sjsu.edu, 408-924-1530 Page 1

    E-Print Network [OSTI]

    Su, Xiao

    page displays. 5. Term: Use the lookup button to search the appropriate term. 6. Due Date: (optional data that exists in the system for the temporary faculty will appear on the Contract Appointment letter/Terms. 2. Click Batch Contracts for T. Faculty. The Batch Process for TF Contract search page displays. 3

  16. SJSU Information Support Services SR102: Basic Records Processing II info-support@sjsu.edu, 408-924-1530 Page 1

    E-Print Network [OSTI]

    Su, Xiao

    this option, skip step 11. The Enter Search Criteria page displays. 9. Enter the Course Subject-924-1530 Page 5 The Enter Search Criteria page displays. 11. Enter at least two criteria and then click. Once students are term activated and assigned a registration appointment time, they can enroll

  17. A review of nuclear fuel cycle options for developing nations

    SciTech Connect (OSTI)

    Harrison, R.K.; Scopatz, A.M.; Ernesti, M. [The University of Texas at Austin, Pickle Research Campus, Building 159, Austin, TX 78712 (United States)

    2007-07-01T23:59:59.000Z

    A study of several nuclear reactor and fuel cycle options for developing nations was performed. All reactor choices were considered under a GNEP framework. Two advanced alternative reactor types, a nuclear battery-type reactor and a fuel reprocessing fast reactor were examined and compared with a conventional Generation III+ LWR reactor. The burn of nuclear fuel was simulated using ORIGEN 2.2 for each reactor type and the resulting information was used to compare the options in terms of waste produced, waste quality and repository impact. The ORIGEN data was also used to evaluate the economics of the fuel cycles using unit costs, discount rates and present value functions with the material balances. The comparison of the fuel cycles and reactors developed in this work provides a basis for the evaluation of subsidy programs and cost-benefit comparisons for various reactor parameters such as repository impact and proliferation risk versus economic considerations. (authors)

  18. Nonlethal weapons as force options for the Army

    SciTech Connect (OSTI)

    Alexander, J.B.

    1994-04-01T23:59:59.000Z

    This paper suggests that future challenges to US national security will be very different from those previously experienced. In a number of foreseeable circumstances, conventional military force will be inappropriate. The National Command Authority, and other appropriate levels of command, need expanded options available to meet threats for which the application of massive lethal force is counterproductive or inadvisable. It is proposed that nonlethal concepts be developed that provide additional options for military leaders and politicians. Included in this initiative should be exploration of policy, strategy, doctrine, and training issues as well as the development of selected technologies and weapons. In addition, civilian law enforcement agencies have similar requirements for less-than-lethal systems. This may be an excellent example for a joint technology development venture.

  19. Technology Options for a Fast Spectrum Test Reactor

    SciTech Connect (OSTI)

    D. M. Wachs; R. W. King; I. Y. Glagolenko; Y. Shatilla

    2006-06-01T23:59:59.000Z

    Idaho National Laboratory in collaboration with Argonne National Laboratory has evaluated technology options for a new fast spectrum reactor to meet the fast-spectrum irradiation requirements for the USDOE Generation IV (Gen IV) and Advanced Fuel Cycle Initiative (AFCI) programs. The US currently has no capability for irradiation testing of large volumes of fuels or materials in a fast-spectrum reactor required to support the development of Gen IV fast reactor systems or to demonstrate actinide burning, a key element of the AFCI program. The technologies evaluated and the process used to select options for a fast irradiation test reactor (FITR) for further evaluation to support these programmatic objectives are outlined in this paper.

  20. Bridge Health Insurance Options ief gap in health

    E-Print Network [OSTI]

    limitations to bear in mind: n denied health care coverage, you almost certainly won't qualify y at the end-800-304-0372 www.anthem.com and click on visitor and click on state. United Health Care at 1-888-545-5205 or visitBridge Health Insurance Options ief gap in health of coverage became seriously hurt or ill. That

  1. project.m

    E-Print Network [OSTI]

    function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D ...

  2. Super Projects (Arkansas)

    Broader source: Energy.gov [DOE]

    A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

  3. Project Selection - Record Keeping

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

  4. W-320 Project thermal modeling

    SciTech Connect (OSTI)

    Sathyanarayana, K., Fluor Daniel Hanford

    1997-03-18T23:59:59.000Z

    This report summarizes the results of thermal analysis performed to provide a technical basis in support of Project W-320 to retrieve by sluicing the sludge in Tank 241-C-106 and to transfer into Tank 241-AY-102. Prior theraml evaluations in support of Project W-320 safety analysis assumed the availability of 2000 to 3000 CFM, as provided by Tank Farm Operations, for tank floor cooling channels from the secondary ventilation system. As this flow availability has no technical basis, a detailed Tank 241-AY-102 secondary ventilation and floor coating channel flow model was developed and analysis was performed. The results of the analysis show that only about 150 cfm flow is in floor cooLing channels. Tank 241-AY-102 thermal evaluation was performed to determine the necessary cooling flow for floor cooling channels using W-030 primary ventilation system for different quantities of Tank 241-C-106 sludge transfer into Tank 241-AY-102. These sludge transfers meet different options for the project along with minimum required modification of the ventilation system. Also the results of analysis for the amount of sludge transfer using the current system is presented. The effect of sludge fluffing factor, heat generation rate and its distribution between supernatant and sludge in Tank 241-AY-102 on the amount of sludge transfer from Tank 241-C-106 were evaluated and the results are discussed. Also transient thermal analysis was performed to estimate the time to reach the steady state. For a 2 feet sludge transfer, about 3 months time will be requirad to reach steady state. Therefore, for the purpose of process control, a detailed transient thermal analysis using GOTH Computer Code will be required to determine transient response of the sludge in Tank 241-AY-102. Process control considerations are also discussed to eliminate the potential for a steam bump during retrieval and storage in Tanks 241-C-106 and 241-AY-102 respectively.

  5. 'Green energy' an option; PSC plan calls for costly wind power

    E-Print Network [OSTI]

    'Green energy' an option; PSC plan calls for costly wind power Denver Post Staff Writer Colorado wind power Page 1 of 3http://eeredev.nrel.gov/greenpower/option.html #12;In a related announcement

  6. Options introduction and volatility in the EU ETS1 Julien Chevallier 2

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    in the European Union Emissions Trading Scheme (EU ETS), the European Climate Exchange (ECX) has introduced option the introduction of options has increased or decreased volatility in the European Union Emissions Trading Sc

  7. Managing a portfolio of real options : sequential exploration of dependent prospects

    E-Print Network [OSTI]

    Smith, James L.

    2004-01-01T23:59:59.000Z

    We consider the impact of sequential investment and active management on the value of a portfolio of real options. The options are assumed to be interdependent, in that exercise of any one is assumed to produce, in addition ...

  8. OPTIMAL EXERCISE POLICIES AND SIMULATION-BASED VALUATION FOR AMERICAN-ASIAN OPTIONS

    E-Print Network [OSTI]

    Fu, Michael

    OPTIMAL EXERCISE POLICIES AND SIMULATION-BASED VALUATION FOR AMERICAN-ASIAN OPTIONS RONGWEN WU-based method that exploits the established structural properties to efficiently price such options. Sections 2

  9. Apply option-thinking in long term infrastructure investment : the case of commercial real estate

    E-Print Network [OSTI]

    Zhang, Na, S.M. Massachusetts Institute of Technology

    2010-01-01T23:59:59.000Z

    Over the last two decades the application of real options theory has dramatically altered the way researches model infrastructure investment decisions. Real options are the right, but not obligation to do something for a ...

  10. A generalized real options methodology for evaluating investments under uncertainty with application to air transportation

    E-Print Network [OSTI]

    Miller, Bruno, 1974-

    2005-01-01T23:59:59.000Z

    Real options analysis is being increasingly used as a tool to evaluate investments under uncertainty; however, traditional real options methodologies have some shortcomings that limit their utility, such as the use of the ...

  11. Assessment of Disposal Options for DOE-Managed High-Level Radioactive...

    Office of Environmental Management (EM)

    Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and...

  12. Basis for Identification of Disposal Options for R and D for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Basis for Identification of Disposal Options for R and D for Spent Nuclear Fuel and High-Level Waste Basis for Identification of Disposal Options for R and D for Spent Nuclear Fuel...

  13. Study on Alternative Cargo Launch Options from the Lunar Surface

    SciTech Connect (OSTI)

    Cheryl A. Blomberg; Zamir A. Zulkefli; Spencer W. Rich; Steven D. Howe

    2013-07-01T23:59:59.000Z

    In the future, there will be a need for constant cargo launches from Earth to Mars in order to build, and then sustain, a Martian base. Currently, chemical rockets are used for space launches. These are expensive and heavy due to the amount of necessary propellant. Nuclear thermal rockets (NTRs) are the next step in rocket design. Another alternative is to create a launcher on the lunar surface that uses magnetic levitation to launch cargo to Mars in order to minimize the amount of necessary propellant per mission. This paper investigates using nuclear power for six different cargo launching alternatives, as well as the orbital mechanics involved in launching cargo to a Martian base from the moon. Each alternative is compared to the other alternative launchers, as well as compared to using an NTR instead. This comparison is done on the basis of mass that must be shipped from Earth, the amount of necessary propellant, and the number of equivalent NTR launches. Of the options, a lunar coil launcher had a ship mass that is 12.7% less than the next best option and 17 NTR equivalent launches, making it the best of the presented six options.

  14. Polycrystalline thin films FY 1992 project report

    SciTech Connect (OSTI)

    Zweibel, K. [ed.

    1993-01-01T23:59:59.000Z

    This report summarizes the activities and results of the Polycrystalline Thin Film Project during FY 1992. The purpose of the DOE/NREL PV (photovoltaic) Program is to facilitate the development of PV that can be used on a large enough scale to produce a significant amount of energy in the US and worldwide. The PV technologies under the Polycrystalline Thin Film project are among the most exciting ``next-generation`` options for achieving this goal. Over the last 15 years, cell-level progress has been steady, with laboratory cell efficiencies reaching levels of 15 to 16%. This progress, combined with potentially inexpensive manufacturing methods, has attracted significant commercial interest from US and international companies. The NREL/DOE program is designed to support the efforts of US companies through cost-shared subcontracts (called ``government/industry partnerships``) that we manage and fund and through collaborative technology development work among industry, universities, and our laboratory.

  15. Project X with Rapid Cycling and Dual Storage Superconducting

    SciTech Connect (OSTI)

    Piekarz, H.; /Fermilab

    2012-05-01T23:59:59.000Z

    Investigation of neutrino oscillations and rare meson decays are the main physics goals of Project X. The successful physics outcome relies on the feasibility of high-intensity neutrino and meson (K{sup +} and {mu}) beams. In order to meet this goal we propose a synchrotron-based accelerator system (Option A) as technologically easier and cost-effective alternative to the accelerator system dominated by the linear accelerators (Option B). The synchrotron-based accelerator system is outlined and the expected proton beam power for the neutrino and meson beams production is presented and discussed. Further conceptual and technical details of the synchrotron-based accelerator system for Project X are outlined.

  16. Screening for Real Options “In” an Engineering System: A Step Towards Flexible System Development

    E-Print Network [OSTI]

    Bartolomei, Jason E.

    2006-04-07T23:59:59.000Z

    The goal of this research is to develop an analytical framework for screening for real options “in” an

  17. American and Bermudan options in currency markets under proportional transaction costs

    E-Print Network [OSTI]

    Roux, Alet

    2011-01-01T23:59:59.000Z

    The pricing and hedging of a general class of options (including American, Bermudan and European options) on multiple assets are studied in the context of currency markets where trading in all assets is subject to proportional transaction costs, and where the existence of a riskfree numeraire is not assumed. Probabilistic dual representations are obtained for the bid and ask prices of such options, together with constructions of hedging strategies, optimal stopping times and approximate martingale representations for both long and short option positions.

  18. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  19. EV Project Overview Report

    Broader source: Energy.gov (indexed) [DOE]

    Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

  20. EV Project Overview Report

    Broader source: Energy.gov (indexed) [DOE]

    Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

  1. Project Risk Management:.

    E-Print Network [OSTI]

    Koelmeyer, Chris

    2013-01-01T23:59:59.000Z

    ?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be… (more)

  2. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  3. Project BETA Cover Page

    E-Print Network [OSTI]

    Cover Page, Project BETA

    2012-01-01T23:59:59.000Z

    and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

  4. EV Project Overview Report

    Broader source: Energy.gov (indexed) [DOE]

    Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

  5. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  6. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  7. Energy Strategic Planning & Self-Sufficiency Project

    SciTech Connect (OSTI)

    Greg Retzlaff

    2005-03-30T23:59:59.000Z

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follow: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  8. International Atomic Energy Agency (IAEA) activities on spent fuel management options

    SciTech Connect (OSTI)

    Lovasic, Z.; Danker, W. [International Atomic Energy Agency (IAEA) Vienna (Austria)

    2007-07-01T23:59:59.000Z

    Many countries have in the past several decades opted for storage of spent fuel for undefined periods of time. They have adopted the 'wait and see' strategy for spent fuel management. A relatively small number of countries have adopted reprocessing and use of MOX fuel as part of their strategy in spent fuel management. From the 10, 000 tonnes of heavy metal that is removed annually from nuclear reactors throughout the world, only approximately 30 % is currently being reprocessed. Continuous re-evaluation of world energy resources, announcement of the Global Nuclear Energy Partnership (GNEP) and the Russian initiative to form international nuclear centers, including reprocessing, are changing the stage for future development of nuclear energy. World energy demand is expected to more than double by 2050, and expansion of nuclear energy is a key to meeting this demand while reducing pollution and greenhouse gases. Since its foundation, the International Atomic Energy Agency (IAEA) has served as an interface between countries in exchanging information on the peaceful development of nuclear energy and at the same time guarding against proliferation of materials that could be used for nuclear weapons. The IAEA's Department of Nuclear Energy has been generating technical documents, holding meetings and conferences, and supporting technical cooperation projects to facilitate this exchange of information. This paper focuses on the current status of IAEA activities in the field of spent fuel management being carried out by the Division of Nuclear Fuel Cycle and Waste Technology. Information on those activities could be found on the web site link www.iaea.org/OurWork/ST/NE/NEFW/nfcms. To date, the IAEA has given priority in its spent fuel management activities to supporting Member States in their efforts to deal with growing accumulations of spent power reactor fuel. There is technical consensus that the present technologies for spent fuel storage, wet and dry, provide adequate protection to people and environment. As storage durations grow, the IAEA has expanded its work related to the implications of extended storage periods. Operation and maintenance of containers for storage and transport have also been investigated related to long term storage periods. In addition, as international interest in reprocessing of spent fuel increases, the IAEA continues to serve as a crossroads for sharing the latest developments in spent fuel treatment options. A Coordinated Research Project is currently addressing spent fuel performance assessment and research to evaluate long term effects of storage on spent fuel. The effect of increased burnup and mixed oxide fuels on spent fuel management is also the focus of interest as it follows the trend in optimizing the use of nuclear fuel. Implications of damaged fuel on storage and transport as well as burnup credit in spent fuel applications are areas that the IAEA is also investigating. Since spent fuel management considerations require social stability and institutional control, those aspects are taken into account in most IAEA activities. Data requirements and records management as storage durations extend were also investigated as well as the potential for regional spent fuel storage facilities. Spent fuel management activities continue to be coordinated with others in the IAEA to ensure compliance and consistency with efforts in the Department of Safety and Security and the Department of Safeguards, as well as with activities related to geologic disposal. Either disposal of radioactive waste or spent fuel will be an ultimate consideration in all spent fuel management options. Updated information on spent fuel treatment options that include fuel reprocessing as well as transmutation of minor actinides are investigated to optimize the use of nuclear fuel and minimize impact on environment. Tools for spent fuel management economics are also investigated to facilitate assessment of industrial applicability for these options. Most IAEA spent fuel management activities will ultimately be reported in o

  9. Efficient pricing of swing options in Levy-driven models Oleg Kudryavtsev

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    ; Amer- ican options; energy derivatives; Numerical methods for option pricing. 1 Introduction for risk management. In a deregulated market, energy contracts will need to be priced accordingEfficient pricing of swing options in L´evy-driven models Oleg Kudryavtsev Department

  10. A NEWTON METHOD FOR AMERICAN OPTION PRICING THOMAS F. COLEMAN, YUYING LI, AND ARUN VERMA

    E-Print Network [OSTI]

    Li, Yuying

    in the American option valuation. We illustrate that the proposed method on aver- age solves a discretized problem curve. American option valuation has been an active research area; many methods have been proposedA NEWTON METHOD FOR AMERICAN OPTION PRICING THOMAS F. COLEMAN, YUYING LI, AND ARUN VERMA December

  11. Beta Smile and Coskewness: Theoretical and Empirical Results in Options Markets

    E-Print Network [OSTI]

    Egami, Masahiko

    Beta Smile and Coskewness: Theoretical and Empirical Results in Options Markets Masahiko Egami of the higher moment risks of option returns, namely beta and coskewness. Under mild assumptions, the investors' decreasing absolute risk aversion can result in a U-shaped pattern (a beta smile) for put option betas

  12. Carbon Dioxide Capture from Coal-Fired Power Plants: A Real Options Analysis Ram Chandra Sekar

    E-Print Network [OSTI]

    Carbon Dioxide Capture from Coal-Fired Power Plants: A Real Options Analysis by Ram Chandra Sekar;2 #12;3 Carbon Dioxide Capture in Coal-Fired Power Plants: A Real Options Analysis by Ram Chandra Sekar technologies are valued using the "real options" valuation methodology in an uncertain carbon dioxide (CO2

  13. Evolution of a Visual Impact Model to Evaluate Nuclear Plant Siting and Design Option1

    E-Print Network [OSTI]

    Standiford, Richard B.

    Evolution of a Visual Impact Model to Evaluate Nuclear Plant Siting and Design Option1 2/ Brian A and economic options for the analysis of nuclear plant siting possibilities (Burnham 1974; Jones, April 1975 of nuclear plant siting options for the AEC. BNWL's multi-disciplinary impact evaluation pro- cedure required

  14. Performance improvement options for the supercritical carbon dioxide brayton cycle.

    SciTech Connect (OSTI)

    Moisseytsev, A.; Sienicki, J. J.; Nuclear Engineering Division

    2008-07-17T23:59:59.000Z

    The supercritical carbon dioxide (S-CO{sub 2}) Brayton cycle is under development at Argonne National Laboratory as an advanced power conversion technology for Sodium-Cooled Fast Reactors (SFRs) as well as other Generation IV advanced reactors as an alternative to the traditional Rankine steam cycle. For SFRs, the S-CO{sub 2} Brayton cycle eliminates the need to consider sodium-water reactions in the licensing and safety evaluation, reduces the capital cost of the SFR plant, and increases the SFR plant efficiency. Even though the S-CO{sub 2} cycle has been under development for some time and optimal sets of operating parameters have been determined, those earlier development and optimization studies have largely been directed at applications to other systems such as gas-cooled reactors which have higher operating temperatures than SFRs. In addition, little analysis has been carried out to investigate cycle configurations deviating from the selected 'recompression' S-CO{sub 2} cycle configuration. In this work, several possible ways to improve S-CO{sub 2} cycle performance for SFR applications have been identified and analyzed. One set of options incorporates optimization approaches investigated previously, such as variations in the maximum and minimum cycle pressure and minimum cycle temperature, as well as a tradeoff between the component sizes and the cycle performance. In addition, the present investigation also covers options which have received little or no attention in the previous studies. Specific options include a 'multiple-recompression' cycle configuration, intercooling and reheating, as well as liquid-phase CO{sub 2} compression (pumping) either by CO{sub 2} condensation or by a direct transition from the supercritical to the liquid phase. Some of the options considered did not improve the cycle efficiency as could be anticipated beforehand. Those options include: a double recompression cycle, intercooling between the compressor stages, and reheating between the turbine stages. Analyses carried out as part of the current investigation confirm the possibilities of improving the cycle efficiency that have been identified in previous investigations. The options in this group include: increasing the heat exchanger and turbomachinery sizes, raising of the cycle high end pressure (although the improvement potential of this option is very limited), and optimization of the low end temperature and/or pressure to operate as close to the (pseudo) critical point as possible. Analyses carried out for the present investigation show that significant cycle performance improvement can sometimes be realized if the cycle operates below the critical temperature at its low end. Such operation, however, requires the availability of a heat sink with a temperature lower than 30 C for which applicability of this configuration is dependent upon the climate conditions where the plant is constructed (i.e., potential performance improvements are site specific). Overall, it is shown that the S-CO{sub 2} Brayton cycle efficiency can potentially be increased to 45 %, if a low temperature heat sink is available and incorporation of larger components (e.g.., heat exchangers or turbomachinery) having greater component efficiencies does not significantly increase the overall plant cost.

  15. Ultracomputer Research Project

    SciTech Connect (OSTI)

    Gottlieb, A.

    1992-10-01T23:59:59.000Z

    This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

  16. Renewable Energy Requirements for Future Building Codes: Options for Compliance

    SciTech Connect (OSTI)

    Dillon, Heather E.; Antonopoulos, Chrissi A.; Solana, Amy E.; Russo, Bryan J.

    2011-09-30T23:59:59.000Z

    As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft{sup 2} of roof area or 0.5 W/ft{sup 2} of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft{sup 2} of r

  17. Evaluation of Project Achievements in VOMARE -project.

    E-Print Network [OSTI]

    Kokkarinen, Eeva

    2011-01-01T23:59:59.000Z

    ??The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation… (more)

  18. NEPA COMPLIANCE SURVEY Project Information Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

  19. Hydropower at flood control reservoirs - the variable speed option

    SciTech Connect (OSTI)

    Laurence, K.; Yale, J. [Stone & Webster Engineering Corp., Denver, CO (United States)

    1995-12-31T23:59:59.000Z

    Application of hydroelectric turbine-generators to flood control has been limited due to the inability of a single turbine to operate efficiently over the wide head and flow ranges encountered. Multiple and different unit combinations have been applied to this problem, but the cost of the additional unit(s), powerhouse, and supporting facilities typically causes the project to become unfeasible. Variable speed operation can increase the operating range of a single turbine, and significantly improve efficiency over single speed units. This can make hydroelectric generation at flood control projects feasible. This paper presents a comparison of the application of variable speed units, two speed units, and single speed units at the Blue River Dam Hydroelectric Project. The project consists of the addition of a powerhouse to an existing Army Corps of Engineers flood control project. Efficiency data for the different types of units are compared and historical flow and release data are used in a computer model to simulate plant operation.

  20. An Assessment of Geological Carbon Storage Options in the Illinois Basin: Validation Phase

    SciTech Connect (OSTI)

    Robert Finley

    2012-12-01T23:59:59.000Z

    The Midwest Geological Sequestration Consortium (MGSC) assessed the options for geological carbon dioxide (CO{sub 2}) storage in the 155,400 km{sup 2} (60,000 mi{sup 2}) Illinois Basin, which underlies most of Illinois, western Indiana, and western Kentucky. The region has annual CO{sub 2} emissions of about 265 million metric tonnes (292 million tons), primarily from 122 coal-fired electric generation facilities, some of which burn almost 4.5 million tonnes (5 million tons) of coal per year (U.S. Department of Energy, 2010). Validation Phase (Phase II) field tests gathered pilot data to update the Characterization Phase (Phase I) assessment of options for capture, transportation, and storage of CO{sub 2} emissions in three geological sink types: coal seams, oil fields, and saline reservoirs. Four small-scale field tests were conducted to determine the properties of rock units that control injectivity of CO{sub 2}, assess the total storage resources, examine the security of the overlying rock units that act as seals for the reservoirs, and develop ways to control and measure the safety of injection and storage processes. The MGSC designed field test operational plans for pilot sites based on the site screening process, MVA program needs, the selection of equipment related to CO{sub 2} injection, and design of a data acquisition system. Reservoir modeling, computational simulations, and statistical methods assessed and interpreted data gathered from the field tests. Monitoring, Verification, and Accounting (MVA) programs were established to detect leakage of injected CO{sub 2} and ensure public safety. Public outreach and education remained an important part of the project; meetings and presentations informed public and private regional stakeholders of the results and findings. A miscible (liquid) CO{sub 2} flood pilot project was conducted in the Clore Formation sandstone (Mississippian System, Chesterian Series) at Mumford Hills Field in Posey County, southwestern Indiana, and an immiscible CO{sub 2} flood pilot was conducted in the Jackson sandstone (Mississippian System Big Clifty Sandstone Member) at the Sugar Creek Field in Hopkins County, western Kentucky. Up to 12% incremental oil recovery was estimated based on these pilots. A CO{sub 2} huff â??nâ?? puff (HNP) pilot project was conducted in the Cypress Sandstone in the Loudon Field. This pilot was designed to measure and record data that could be used to calibrate a reservoir simulation model. A pilot project at the Tanquary Farms site in Wabash County, southeastern Illinois, tested the potential storage of CO{sub 2} in the Springfield Coal Member of the Carbondale Formation (Pennsylvanian System), in order to gauge the potential for large-scale CO{sub 2} storage and/or enhanced coal bed methane recovery from Illinois Basin coal beds. The pilot results from all four sites showed that CO{sub 2} could be injected into the subsurface without adversely affecting groundwater. Additionally, hydrocarbon production was enhanced, giving further evidence that CO{sub 2} storage in oil reservoirs and coal beds offers an economic advantage. Results from the MVA program at each site indicated that injected CO{sub 2} did not leave the injection zone. Topical reports were completed on the Middle and Late Devonian New Albany Shale and Basin CO{sub 2} emissions. The efficacy of the New Albany Shale as a storage sink could be substantial if low injectivity concerns can be alleviated. CO{sub 2} emissions in the Illinois Basin were projected to be dominated by coal-fired power plants.