  1. PC Electronic Data Reporting Option (PEDRO) System

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry Natural GasNatural GasEIARegionalMethodologyNorth093 *OilSystem

  2. PC Electronic Data Reporting Option (PEDRO) System - Patch Archive

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry NaturalPrices1Markets16 (next20,System - Patch Archive PEDRO

  3. PEDRO (Petroleum Electronic Data Reporting Option) user guide

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    PEDRO is an electronic data communications product that simplifies filing and transmission of petroleum survey data. Your burden is significantly reduced as PEDRO eliminates paperwork, provides immediate onsite correction of data errors, and reduces the need for followup calls and survey resubmission. PEDRO provides an online error-checking process that highlights discrepancies. This permits you to enter and check data before transmitting to EIA. EIA then combines and reformats the data from different users for use by analytical and reporting programs. PEDRO is available at no cost to the user. Formal training is not required since installation, data processing, and transmission are done by interactive, user-friendly menu options. The PEDRO system is divided into three functions: (1) data processing, (2) transmitting data to EIA, and (3) EIA processing. 28 figs.

  4. SUPPORT FOR OPEN TOOLS AND SYSTEMS s Carrico, Pedro Antunes, Nuno Guimar~aes,

    E-Print Network [OSTI]

    Antunes, Pedro

    SUPPORT FOR OPEN TOOLS AND SYSTEMS Lu s Carrico, Pedro Antunes, Nuno Guimar~aes, Paula Pereira,paa,nmgg@inesc.pt Abstract: The constructionof interactive tools for currentcomputingenvironmentsrelies upon a generic set foundational components that support the construction of these tools. Two di erent tools, an application

  5. Cogeneration System Design Options

    E-Print Network [OSTI]

    Gilbert, J. S.

    1985-01-01

    The commercial or industrial firm contemplating cogeneration at its facilities faces numerous basic design choices. The possibilities exist for fueling the system with waste materials, gas, oil, coal, or other combustibles. The choice of boiler...

  6. IIIPRISMA System Operator's Manual PRISMA Therapy Options ............................................................................. 2

    E-Print Network [OSTI]

    Kay, Mark A.

    IIIPRISMA System Operator's Manual ... PRISMA Therapy Options .................................................................................................... PRISMA System ............................... xvi Operator's Manual ......................................................... #12;PRISMA System Operator's Manual ia Controller CCA

  7. Propulsive options for a manned Mars transportation system

    SciTech Connect (OSTI)

    Braun, R.D.; Blersch, D.J.

    1989-01-01

    In this investigation, five potential manned Mars transportation systems are compared. These options include: (1) a single vehicle, chemically propelled (CHEM) option, (2) a single vehicle, nuclear thermal propulsion (NTP) option, (3) a single vehicle solar electric propulsion (SEP) option, (4) a single vehicle hybrid nuclear electric propulsion (NEP)/CHEM option, and (5) a dual vehicle option (NEP cargo spacecraft and CHEM manned vehicle). In addition to utilizing the initial vehicle weight in low-earth orbit as a measure of mission feasibility, this study addresses the major technological barriers each propulsive scenario must surpass. It is shown that instead of a single clearly superior propulsion system, each means of propulsion may be favored depending upon the specified program policy and the extent of the desired manned flight time. Furthermore, the effect which aerobraking and multiple transfer cycles have upon mission feasibility is considered. 18 refs.

  8. Seattle's system for evaluating energy options

    SciTech Connect (OSTI)

    Logie, P.; Macdonald, M.J.

    1982-01-01

    In 1975, the City Council developed a blueprint called Energy 1990 for meeting Seattle's future electric energy needs. Priorities for addressing or offsetting expected growth in demand are in order: (1) conservation (2) hydroelectricity (3) other renewable sources such as wind, biomass, solar, and geothermal energy (4) abundant nonrenewable resources such as coal, and (5) other renewables. An energy resources planning group was formed and a data base was established. Resource options were investigated and the recommendations were published.

  9. Platforms and real options in large-scale engineering systems

    E-Print Network [OSTI]

    Kalligeros, Konstantinos C., 1976-

    2006-01-01

    This thesis introduces a framework and two methodologies that enable engineering management teams to assess the value of real options in programs of large-scale, partially standardized systems implemented a few times over ...

  10. Effluent treatment options for nuclear thermal propulsion system ground tests

    SciTech Connect (OSTI)

    Shipers, L.R.; Brockmann, J.E.

    1992-10-16

    A variety of approaches for handling effluent from nuclear thermal propulsion system ground tests in an environmentally acceptable manner are discussed. The functional requirements of effluent treatment are defined and concept options are presented within the framework of these requirements. System concepts differ primarily in the choice of fission-product retention and waste handling concepts. The concept options considered range from closed cycle (venting the exhaust to a closed volume or recirculating the hydrogen in a closed loop) to open cycle (real time processing and venting of the effluent). This paper reviews the strengths and weaknesses of different methods to handle effluent from nuclear thermal propulsion system ground tests.

  11. COHERENT LASER VISION SYSTEM (CLVS) OPTION PHASE

    SciTech Connect (OSTI)

    Robert Clark

    1999-11-18

    The purpose of this research project was to develop a prototype fiber-optic based Coherent Laser Vision System (CLVS) suitable for DOE's EM Robotic program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update the dimensional spatial data on the order of once per second. The system has total immunity to ambient lighting conditions.

  12. Thermal Storage Options for HVAC Systems

    E-Print Network [OSTI]

    Weston, R. F.; Gidwani, B. N.

    1986-01-01

    is based on the specific heat of water rather than the latent 'heat of fusion of ice as in ice storage, it requires about 4 times the storage capacity of an equivalent ice storage system. ? Salt Storage: This system utilizes eutectic salts which... freeze and melt around 47 o F. Exist ing chillers can be easily retrofitted for salt storage or chilled water storage. For ice stor age systems, a direct refrigerant system or glycol chillers are suitable. This paper discusses the details of each...

  13. Using System Dynamics to Extend Real Options Use: Insights from the Oil & Gas Industry

    E-Print Network [OSTI]

    Ford, David N.

    Using System Dynamics to Extend Real Options Use: Insights from the Oil & Gas Industry Scott to real options through work with a major energy firm to apply real options. Five key challenges facing the real options community are presented and potential system dynamics contributions to these challenges

  14. Real options "in" projects and systems design : identification of options and solutions for path dependency

    E-Print Network [OSTI]

    Wang, Tao, 1973-

    2005-01-01

    This research develops a comprehensive approach to identify and deal with real options in" projects, that is, those real options (flexibility) that are integral parts of the technical design. It represents a first attempt ...

  15. A Compact and Scalable RNS Architecture Pedro Miguens Matutino

    E-Print Network [OSTI]

    Sousa, Leonel

    A Compact and Scalable RNS Architecture Pedro Miguens Matutino ISEL / INESC-ID / IST, Technical a unified architecture for designing Residue Number System (RNS) based processors for moduli sets with an arbitrary number of channels. Recently, new RNS moduli sets have been proposed in order to increase

  16. RNS Arithmetic Units for Modulo {2n Pedro Miguens Matutino

    E-Print Network [OSTI]

    Sousa, Leonel

    RNS Arithmetic Units for Modulo {2n ± k} Pedro Miguens Matutino ISEL/INESC-ID/IST Lisbon, Portugal (hector,rjfc,las)@sips.inesc-id.pt Abstract--Recently new Residue Number Systems (RNS) moduli sets have. In this paper we propose improved units for addition, subtraction, and multiplication in RNS for modulo {2n ± k

  17. Perceptions of Real Options in Large System Acquisition: Empirical Descriptions and Comparison with Theory

    E-Print Network [OSTI]

    Ford, David N.

    Perceptions of Real Options in Large System Acquisition: Empirical Descriptions and Comparison Postgraduate School Monterey, California May 18 - 19, 2005 #12;1 Perceptions of Real Options in Large System to meet performance, schedule, and cost targets. Flexibility in the form of real options can

  18. Berkeley Program Offers New Option for Financing Residential PV Systems

    E-Print Network [OSTI]

    Bolinger, Mark A

    2009-01-01

    Berkeley Program Offers New Option for Financing Residentialparticularly those that offer solar rebates. The passage ofthese cities propose to offer their residents the ability to

  19. Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design

    E-Print Network [OSTI]

    Ogden, Joan M; Yang, Christopher

    2005-01-01

    impact of improved hydrogen storage may be through makingand M. Gardiner, Hydrogen Storage Options: Technologies andReducing the liquid hydrogen storage dewar cost has only a

  20. Waste Heat Management Options: Industrial Process Heating Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And Statistics » USAJobs SearchAMERICA'S FUTURE. regulators02-03Heat Management Options

  1. A Logical Approach to Real Options Identification with Application to UAV Systems

    E-Print Network [OSTI]

    Mikaelian, Tsoline

    Complex systems are subject to uncertainties that may lead to suboptimal performance or even catastrophic failure if unmanaged. Uncertainties may be managed through real options that provide a decision maker with the right, ...

  2. Life cycle assessment of base-load heat sources for district heating system options

    SciTech Connect (OSTI)

    Ghafghazi, Saeed [University of British Columbia, Vancouver; Sowlati, T. [University of British Columbia, Vancouver; Sokhansanj, Shahabaddine [ORNL; Melin, Staffan [Delta Research Corporation

    2011-03-01

    Purpose There has been an increased interest in utilizing renewable energy sources in district heating systems. District heating systems are centralized systems that provide heat for residential and commercial buildings in a community. While various renewable and conventional energy sources can be used in such systems, many stakeholders are interested in choosing the feasible option with the least environmental impacts. This paper evaluates and compares environmental burdens of alternative energy source options for the base load of a district heating center in Vancouver, British Columbia (BC) using the life cycle assessment method. The considered energy sources include natural gas, wood pellet, sewer heat, and ground heat. Methods The life cycle stages considered in the LCA model cover all stages from fuel production, fuel transmission/transportation, construction, operation, and finally demolition of the district heating system. The impact categories were analyzed based on the IMPACT 2002+ method. Results and discussion On a life-cycle basis, the global warming effect of renewable energy options were at least 200 kgeqCO2 less than that of the natural gas option per MWh of heat produced by the base load system. It was concluded that less than 25% of the upstream global warming impact associated with the wood pellet energy source option was due to transportation activities and about 50% of that was resulted from wood pellet production processes. In comparison with other energy options, the wood pellets option has higher impacts on respiratory of inorganics, terrestrial ecotoxicity, acidification, and nutrification categories. Among renewable options, the global warming impact of heat pump options in the studied case in Vancouver, BC, were lower than the wood pellet option due to BC's low carbon electricity generation profile. Ozone layer depletion and mineral extraction were the highest for the heat pump options due to extensive construction required for these options. Conclusions Natural gas utilization as the primary heat source for district heat production implies environmental complications beyond just the global warming impacts. Diffusing renewable energy sources for generating the base load district heat would reduce human toxicity, ecosystem quality degradation, global warming, and resource depletion compared to the case of natural gas. Reducing fossil fuel dependency in various stages of wood pellet production can remarkably reduce the upstream global warming impact of using wood pellets for district heat generation.

  3. Berkeley Program Offers New Option for Financing Residential PV Systems

    E-Print Network [OSTI]

    Bolinger, Mark A

    2009-01-01

    Vehicle for Residential PV Installations: Opportunities andfor Financing Residential PV Systems Mark Bolinger, Lawrencefor residential photovoltaic (PV) systems. Though financing

  4. Binary-to-RNS conversion units for moduli {2n Pedro Miguens Matutino

    E-Print Network [OSTI]

    Sousa, Leonel

    Binary-to-RNS conversion units for moduli {2n 3} Pedro Miguens Matutino Department of Electronics@inesc-id.pt Abstract--In this paper Residue Number Systems (RNS) con- version structures from Binary to RNS modulo {2n Residue Number Systems (RNS) are a good alternative to the conventional arithmetic, based on a weighted

  5. Sermon 2: Building High-Performance Systems 2.1 Options for performance tuning

    E-Print Network [OSTI]

    Dahlin, Michael D.

    Sermon 2: Building High-Performance Systems 2.1 Options for performance tuning 1. Make every line in advance. 3. Tuning takes time and makes system more complicated Biggest gain is going from non systems are used, see where bottleneck is. 2. Modeling -- back of the envelope calculations (example: 100

  6. Berkeley Program Offers New Option for Financing Residential PV Systems

    E-Print Network [OSTI]

    Bolinger, Mark A

    2009-01-01

    financing does not reduce the high up-front cost of PV, byto PV owners, including long- term, fixed-cost, attractivecost over some portion of the systems life, financing can certainly make PV

  7. Berkeley Program Offers New Option for Financing Residential PV Systems

    E-Print Network [OSTI]

    Bolinger, Mark A

    2009-01-01

    any subsidized energy financing used to finance the system.Energy States Alliance, titled Property Tax Assessments as a Finance

  8. Extension Investment Option 2015-17 Food Systems, Food Security, Food Safety

    E-Print Network [OSTI]

    Tullos, Desiree

    Extension Investment Option 2015-17 Food Systems, Food Security, Food Safety The Statewide Need: Food is complicated--culturally, politically, and economically. A food systems approach is a key the foundational strengths of OSU Extension and its delivery model in communities and across the state. Food

  9. Multi-Robot Cooperative Object Tracking Based on Particle Filters Aamir Ahmad Pedro Lima

    E-Print Network [OSTI]

    1 Multi-Robot Cooperative Object Tracking Based on Particle Filters Aamir Ahmad Pedro Lima Institute for Systems and Robotics, Instituto Superior Tecnico, Lisboa, Portugal Abstract-- This article presents a cooperative approach for tracking a moving object by a team of mobile robots equipped

  10. Modeling Chemical Reactions with Single Reactant Specie Abhyudai Singh and Jo~ao Pedro Hespanha

    E-Print Network [OSTI]

    Hespanha, Joo Pedro

    Modeling Chemical Reactions with Single Reactant Specie Abhyudai Singh and Jo~ao Pedro Hespanha Abstract-- A procedure for constructing approximate stochastic models for chemical reactions involving involved in a chemical reaction as the continuous state of a polynomial Stochastic Hybrid System (p

  11. Multiplier-based Binary-to-RNS Converter Modulo {2n +-k} Pedro Miguens Matutino

    E-Print Network [OSTI]

    Sousa, Leonel

    125 Multiplier-based Binary-to-RNS Converter Modulo {2n +- k} Pedro Miguens Matutino ISEL for binary- to-RNS conversion modulo {2n ± k} is proposed. The proposed structure is based on adders know to date. I. INTRODUCTION The modular characteristics of Residue Number System (RNS) offers

  12. Screening for Real Options In an Engineering System: A Step Towards Flexible System Development

    E-Print Network [OSTI]

    Bartolomei, Jason E.

    2006-04-07

    The goal of this research is to develop an analytical framework for screening for real options in an

  13. Local Option- Property Tax Exemption for Renewable Energy Systems

    Broader source: Energy.gov [DOE]

    Note that a separate statute (R.I. Gen. Laws 44-57-4) specifies that for purposes of local municipal property tax assessment, certain residential solar-energy systems may not be assessed at more...

  14. 2016 Version BCom option in Management Information Systems and Analytics

    E-Print Network [OSTI]

    Xia, Xuhua

    of Information Technology for Business W ADM 1300 ECO 1102 Introduction to Macroeconomics W ECO 1104 Information Systems F/W ADM 1370 ADM 2381 Business Communication Skills F/W ADM 1300, ENG 1131, 30 credits PHI 2397 Business Ethics F/W SOC 3116 Technologies, World and Societies F/W 18 SOC credits or 54

  15. Berkeley Program Offers New Option for Financing Residential PV Systems

    SciTech Connect (OSTI)

    Bolinger, Mark A

    2008-07-06

    Readily accessible credit has often been cited as a necessary ingredient to open up the market for residential photovoltaic (PV) systems. Though financing does not reduce the high up-front cost of PV, by spreading that cost over some portion of the system's life, financing can certainly make PV systems more affordable. As a result, a number of states have, in the past, set up special residential loan programs targeting the installation of renewable energy systems and/or energy-efficiency improvements and often featuring low interest rates, longer terms and no-hassle application requirements. Historically, these loan programs have had mixed success (particularly for PV), for a variety of reasons, including a historical lack of homeowner interest in PV, a lack of program awareness, a reduced appeal in a low-interest-rate environment, and a tendency for early PV adopters to be wealthy and not in need of financing. Some of these barriers have begun to fade. Most notably, homeowner interest in PV has grown in some states, particularly those that offer solar rebates. The passage of the Energy Policy Act of 2005 (EPAct 2005), however, introduced one additional roadblock to the success of low-interest PV loan programs: a residential solar investment tax credit (ITC), subject to the Federal government's 'anti-double-dipping' rules. Specifically, the residential solar ITC--equal to 30% of the system's tax basis, capped at $2000--will be reduced or offset if the system also benefits from what is known as 'subsidized energy financing', which is likely to include most government-sponsored low-interest loan programs. Within this context, it has been interesting to note the recent flurry of announcements from a number of U.S cities concerning a new type of PV financing program. Led by the city of Berkeley, Calif., these cities propose to offer their residents the ability to finance the installation of a PV system using increased property tax assessments, rather than a more-traditional credit vehicle, to recover both system and administrative costs. This approach has a number of features that should appeal to PV owners, including long-term, fixed-cost, attractive financing; loans that are tied to the tax capacity of the property rather than to the owner's credit standing; a repayment obligation that transfers along with the sale of the property; and a potential ability to deduct the repayment obligation from federal taxable income as part of the local property tax deduction. For these reasons, Berkeley's program, which was first announced on October 23, 2007, has received considerable nationwide attention in both the trade and general press. Since the announcement, cities from throughout California and the broader U.S. have expressed keen interest in the possibility of replicating this type of program. In California alone, the cities of Santa Cruz, Santa Monica and Palm Desert are all reportedly considering similar programs, while the city of San Francisco has recently announced its own program, portions of which closely parallel Berkeley's approach. In addition, a bill (AB 811) that would authorize all cities in California, not just charter cities like Berkeley, to create this type of program was approved by the California General Assembly on January 29 and is currently under consideration in the State Senate. A similar bill in Colorado (HB 1350) was signed into law on May 28. Elsewhere, the city of Tucson, Arizona has also considered this financing approach.

  16. Control system options and strategies for supercritical CO2 cycles.

    SciTech Connect (OSTI)

    Moisseytsev, A.; Kulesza, K. P.; Sienicki, J. J.; Nuclear Engineering Division; Oregon State Univ.

    2009-06-18

    The Supercritical Carbon Dioxide (S-CO{sub 2}) Brayton Cycle is a promising alternative to Rankine steam cycle and recuperated gas Brayton cycle energy converters for use with Sodium-Cooled Fast Reactors (SFRs), Lead-Cooled Fast Reactors (LFRs), as well as other advanced reactor concepts. The S-CO{sub 2} Brayton Cycle offers higher plant efficiencies than Rankine or recuperated gas Brayton cycles operating at the same liquid metal reactor core outlet temperatures as well as reduced costs or size of key components especially the turbomachinery. A new Plant Dynamics Computer Code has been developed at Argonne National Laboratory for simulation of a S-CO{sub 2} Brayton Cycle energy converter coupled to an autonomous load following liquid metal-cooled fast reactor. The Plant Dynamics code has been applied to investigate the effectiveness of a control strategy for the S-CO{sub 2} Brayton Cycle for the STAR-LM 181 MWe (400 MWt) Lead-Cooled Fast Reactor. The strategy, which involves a combination of control mechanisms, is found to be effective for controlling the S-CO{sub 2} Brayton Cycle over the complete operating range from 0 to 100 % load for a representative set of transient load changes. While the system dynamic analysis of control strategy performance for STARLM is carried out for a S-CO{sub 2} Brayton Cycle energy converter incorporating an axial flow turbine and compressors, investigations of the S-CO{sub 2} Brayton Cycle have identified benefits from the use of centrifugal compressors which offer a wider operating range, greater stability near the critical point, and potentially further cost reductions due to fewer stages than axial flow compressors. Models have been developed at Argonne for the conceptual design and performance analysis of centrifugal compressors for use in the SCO{sub 2} Brayton Cycle. Steady state calculations demonstrate the wider operating range of centrifugal compressors versus axial compressors installed in a S-CO{sub 2} Brayton Cycle as well as the benefits in expanding the range over which individual control mechanisms are effective for cycle control. However, a combination of mechanisms is still required for control of the S-CO{sub 2} Brayton Cycle between 0 and 100 % load. An effort is underway to partially validate the Argonne models and codes by means of comparison with data from tests carried out using the small-scale Sandia Brayton Loop (SBL) recuperated gas closed Brayton cycle facility. The centrifugal compressor model has been compared with data from the SBL operating with nitrogen gas and good agreement is obtained between calculations and the measured data for the compressor outlet pressure versus flow rate, although it is necessary to assume values for certain model parameters which require information about the configuration or dimensions of the compressor components that is unavailable. Unfortunately, the compressor efficiency cannot be compared with experiment data due to the lack of outlet temperature data. A radial inflow turbine model has been developed to enable further comparison of calculations with data from the SBL which incorporates both a radial inflow turbine as well as a radial compressor. Preliminary calculations of pressure ratio and efficiency versus flow rate have been carried out using the radial inflow turbine model.

  17. Pedro Communications Patch for All Versions

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet)Decade Year-0 Year-1 Year-2 Year-3+Elements) Gas6 FebruaryCubicPedro

  18. ACCIDENT ANALYSES & CONTROL OPTIONS IN SUPPORT OF THE SLUDGE WATER SYSTEM SAFETY ANALYSIS

    SciTech Connect (OSTI)

    WILLIAMS, J.C.

    2003-11-15

    This report documents the accident analyses and nuclear safety control options for use in Revision 7 of HNF-SD-WM-SAR-062, ''K Basins Safety Analysis Report'' and Revision 4 of HNF-SD-SNF-TSR-001, ''Technical Safety Requirements - 100 KE and 100 KW Fuel Storage Basins''. These documents will define the authorization basis for Sludge Water System (SWS) operations. This report follows the guidance of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports'', for calculating onsite and offsite consequences. The accident analysis summary is shown in Table ES-1 below. While this document describes and discusses potential control options to either mitigate or prevent the accidents discussed herein, it should be made clear that the final control selection for any accident is determined and presented in HNF-SD-WM-SAR-062.

  19. High Power Electric Propulsion System for NEP: Propulsion and Trajectory Options

    SciTech Connect (OSTI)

    Koppel, Christophe R.; Duchemin, Olivier; Valentian, Dominique

    2006-01-20

    Recent US initiatives in Nuclear Propulsion lend themselves naturally to raising the question of the assessment of various options and particularly to propose the High Power Electric Propulsion Subsystem (HPEPS) for the Nuclear Electric Propulsion (NEP). The purpose of this paper is to present the guidelines for the HPEPS with respect to the mission to Mars, for automatic probes as well as for manned missions. Among the various options, the technological options and the trajectory options are pointed out. The consequences of the increase of the electrical power of a thruster are first an increase of the thrust itself, but also, as a general rule, an increase of the thruster performance due to its higher efficiency, particularly its specific impulse increase. The drawback is as a first parameter, the increase of the thruster's size, hence the so-called 'thrust density' shall be high enough or shall be drastically increased for ions thrusters. Due to the large mass of gas needed to perform the foreseen missions, the classical xenon rare gas is no more in competition, the total world production being limited to 20 -40 tons per year. Thus, the right selection of the propellant feeding the thruster is of prime importance. When choosing a propellant with lower molecular mass, the consequences at thruster level are an increase once more of the specific impulse, but at system level the dead mass may increase too, mainly because the increase of the mass of the propellant system tanks. Other alternatives, in rupture with respect to the current technologies, are presented in order to make the whole system more attractive. The paper presents a discussion on the thruster specific impulse increase that is sometime considered an increase of the main system performances parameter, but that induces for all electric propulsion systems drawbacks in the system power and mass design that are proportional to the thruster specific power increase (kW/N). The electric thruster specific impulse shall be optimized w.r.t. the mission. The trajectories taken into account in the paper are constrained by the allowable duration of the travel and the launcher size. The multi-arcs trajectories to Mars (using an optimized combination of chemical and Electric propulsion) are presented in detail. The compatibility with NEP systems that implies orbiting a sizeable nuclear reactor and a power generation system capable of converting thermal into electric power, with minimum mass and volumes fitting in with Ariane 5 or the Space Shuttle bay, is assessed.

  20. The Environmental Impacts of Logistics Systems and Options for Mitigation Nakul Sathaye, Yuwei Li, Arpad Horvath and Samer Madanat

    E-Print Network [OSTI]

    California at Berkeley, University of

    The Environmental Impacts of Logistics Systems and Options for Mitigation Nakul Sathaye, Yuwei Li. Transportation Sustainability and Green Logistics ................................................3 1 .....................................................................................3 1.2. Considering Green Logistics with Industry Perspectives

  1. Decimal multiplication on FPGA based on a RNS representation Pedro Miguens Matutino , Ricardo Chaves, Horacio Neto, Leonel Sousa

    E-Print Network [OSTI]

    Sousa, Leonel

    Decimal multiplication on FPGA based on a RNS representation Pedro Miguens Matutino , Ricardo of implementing Decimal multi- plication operators using Residue Number Systems (RNS). This work proposes new RNS have better performances in RNS when com- pared with the binary representation. However, the conver

  2. A life-cycle flexibility framework for designing, evaluating and managing "complex" real options : case studies in urban transportation and aircraft systems

    E-Print Network [OSTI]

    McConnell, Joshua B. (Joshua Bryan), 1974-

    2007-01-01

    Designing a flexible system with real options is a method for managing uncertainty. This research introduces the concept of "complex" real options, which are composed of interconnected echnological, organizational and ...

  3. Understanding Carbon Sequestration Options in the United States: Capabilities of a Carbon Management Geographic Information System

    SciTech Connect (OSTI)

    Dahowski, Robert T.; Dooley, James J.; Brown, Daryl R.; Mizoguchi, Akiyoshi; Shiozaki, Mai

    2001-04-03

    While one can discuss various sequestration options at a national or global level, the actual carbon management approach is highly site specific. In response to the need for a better understanding of carbon management options, Battelle in collaboration with Mitsubishi Corporation, has developed a state-of-the-art Geographic Information System (GIS) focused on carbon capture and sequestration opportunities in the United States. The GIS system contains information (e.g., fuel type, location, vintage, ownership, rated capacity) on all fossil-fired generation capacity in the Untied States with a rated capacity of at least 100 MW. There are also data on other CO2 sources (i.e., natural domes, gas processing plants, etc.) and associated pipelines currently serving enhanced oil recovery (EOR) projects. Data on current and prospective CO2 EOR projects include location, operator, reservoir and oil characteristics, production, and CO2 source. The system also contains information on priority deep saline aquifers and coal bed methane basins with potential for sequestering CO2. The GIS application not only enables data storage, flexible map making, and visualization capabilities, but also facilitates the spatial analyses required to solve complex linking of CO2 sources with appropriate and cost-effective sinks. A variety of screening criteria (spatial, geophysical, and economic) can be employed to identify sources and sinks most likely amenable to deployment of carbon capture and sequestration systems. The system is easily updateable, allowing it to stay on the leading edge of capture and sequestration technology as well as the ever-changing business landscape. Our paper and presentation will describe the development of this GIS and demonstrate its uses for carbon management analysis.

  4. Nutritional Assessment of the Elderly of San Pedro Ayampuc, Guatemala: Evaluation of Anthropometry, Biochemistry, and Helminthic Infection

    E-Print Network [OSTI]

    King, Jane E

    1991-01-01

    y Asistencia Social. Guatemala en Cifras de Salud AnuarioSan Pedro Ayampuc, Guatemala: Evaluation of Anthropometry,of San Pedro Ayampuc, Guatemala, without whose enthusiasm

  5. Simulation vs Real Execution in DCOP Solving Francisco Cruz, Patricia Gutierrez, Pedro Meseguer

    E-Print Network [OSTI]

    Yeoh, William

    Simulation vs Real Execution in DCOP Solving Francisco Cruz, Patricia Gutierrez, Pedro Meseguer environment they try to recreate. #12;2 Francisco Cruz, Patricia Gutierrez, Pedro Meseguer Typically, DCR

  6. Systems engineering study: tank 241-C-103 organic skimming,storage, treatment and disposal options

    SciTech Connect (OSTI)

    Klem, M.J.

    1996-10-23

    This report evaluates alternatives for pumping, storing, treating and disposing of the separable phase organic layer in Hanford Site Tank 241-C-103. The report provides safety and technology based preferences and recommendations. Two major options and several varations of these options were identified. The major options were: 1) transfer both the organic and pumpable aqueous layers to a double-shell tank as part of interim stabilization using existing salt well pumping equipment or 2) skim the organic to an above ground before interim stabilization of Tank 241-C-103. Other options to remove the organic were considered but rejected following preliminary evaluation.

  7. TANK SPACE OPTIONS REPORT

    SciTech Connect (OSTI)

    WILLIS WL; AHRENDT MR

    2009-08-11

    Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

  8. Synthetic Biology and the U.S. Biotechnology Regulatory System: Challenges and Options

    SciTech Connect (OSTI)

    Carter, Sarah R.; Rodemeyer, Michael; Garfinkel, Michele S.; Friedman, Robert M

    2014-05-01

    Synthetic Biology and the U.S. Biotechnology Regulatory System: Challenges and Options Sarah R. Carter, Ph.D., J. Craig Venter Institute; Michael Rodemeyer, J.D., University of Virginia; Michele S. Garfinkel, Ph.D., EMBO; Robert M. Friedman, Ph.D., J. Craig Venter Institute In recent years, a range of genetic engineering techniques referred to as synthetic biology has significantly expanded the tool kit available to scientists and engineers, providing them with far greater capabilities to engineer organisms than previous techniques allowed. The field of synthetic biology includes the relatively new ability to synthesize long pieces of DNA from chemicals, as well as improved methods for genetic manipulation and design of genetic pathways to achieve more precise control of biological systems. These advances will help usher in a new generation of genetically engineered microbes, plants, and animals. The JCVI Policy Center team, along with researchers at the University of Virginia and EMBO, examined how well the current U.S. regulatory system for genetically engineered products will handle the near-term introduction of organisms engineered using synthetic biology. In particular, the focus was on those organisms intended to be used or grown directly in the environment, outside of a contained facility. The study concludes that the U.S. regulatory agencies have adequate legal authority to address most, but not all, potential environmental, health and safety concerns posed by these organisms. Such near-term products are likely to represent incremental changes rather than a marked departure from previous genetically engineered organisms. However, the study also identified two key challenges for the regulatory system, which are detailed in the report. First, USDAs authority over genetically engineered plants depends on the use of an older engineering technique that is no longer necessary for many applications. The shift to synthetic biology and other newer genetic engineering techniques will leave many engineered plants without any pre-market regulatory review. Second, the number and diversity of engineered microbes for commercial use will increase in the near future, challenging EPAs resources, expertise, and perhaps authority to regulate them. For each of these challenges, the report sets out a series of options, including an analysis of the advantages and disadvantages of each option from a variety of perspectives, for policy makers to consider. Policy responses will depend on the trade-offs chosen among competing considerations. This report, funded by the Department of Energy with additional funds from the Alfred P. Sloan Foundation, is the result of a two-year process that included interviews, commissioned background papers, discussions, and two workshops that sought input from a wide range of experts, including U.S. federal agency regulators, legal and science policy experts, representatives from the biotechnology industry, and non-governmental organizations. This cross-section of views informed this report, but the conclusions are solely those of the authors. An Executive Summary, full Report, and background papers are available at: http://www.jcvi.org/cms/research/projects/synthetic-biology-and-the-us-biotechnology-regulatory-system/overview/

  9. REAL-TIME TELEMETRY OPTIONS FOR OCEAN OBSERVING SYSTEMS , G. Chang2

    E-Print Network [OSTI]

    Kastner, Ryan

    survey these telemetry options to highlight the research problems associated with subsea to surface the research problems associated with subsea to surface to shore networking. We then present specific examples

  10. Formula-Based Probabilistic Inference Vibhav Gogate and Pedro Domingos

    E-Print Network [OSTI]

    Gogate, Vibhav

    Formula-Based Probabilistic Inference Vibhav Gogate and Pedro Domingos Computer Science Computing the probability of a formula given the probabilities or weights associated with other formulas: formula decomposition and conditioning, which is an exact method, and formula importance sampling, which

  11. Dirio Digital DIRECTOR: PEDRO CURVELO Ensino | Cincia e Tecnologia | Ambiente

    E-Print Network [OSTI]

    Instituto de Sistemas e Robotica

    ambiente, o clima, a energia, a educação, o desporto e o território. Diário Digital com Lusa Fusão dasDiário Digital DIRECTOR: PEDRO CURVELO Ensino | Ciência e Tecnologia | Ambiente 02-01-2013 às 14

  12. Toward Knowledge-Rich Data Mining Pedro Domingos

    E-Print Network [OSTI]

    Domingos, Pedro

    Toward Knowledge-Rich Data Mining Pedro Domingos Department of Computer Science and Engineering University of Washington Seattle, WA 98195 pedrod@cs.washington.edu 1 The Knowledge Gap Data mining has made tremendous progress in the last ten years. However, a large gap remains between the results a data mining

  13. TEORIJA IN PRAKSA let. 47, 5/2010 Pedro PERISTA*

    E-Print Network [OSTI]

    Birmingham, University of

    expectancy at birth and decrease in death rates are reducing this decline but they in turn pose a significant- teristic Portuguese emigration, the decreasing birth rates are far below the level needed and creating important challenges for a late and weak welfare state * Pedro Perista, researcher, CESIS Centre

  14. An applied study using systems engineering methods to prioritize green systems options

    SciTech Connect (OSTI)

    Lee, Sonya M; Macdonald, John M

    2009-01-01

    For many years, there have been questions about the effectiveness of applying different green solutions. If you're building a home and wish to use green technologies, where do you start? While all technologies sound promising, which will perform the best over time? All this has to be considered within the cost and schedule of the project. The amount of information available on the topic can be overwhelming. We seek to examine if Systems Engineering methods can be used to help people choose and prioritize technologies that fit within their project and budget. Several methods are used to gain perspective into how to select the green technologies, such as the Analytic Hierarchy Process (AHP) and Kepner-Tregoe. In our study, subjects applied these methods to analyze cost, schedule, and trade-offs. Results will document whether the experimental approach is applicable to defining system priorities for green technologies.

  15. OPTIONS for systemic change in mathematics, science, and technology education: Scientist/teacher partnerships

    SciTech Connect (OSTI)

    Glantz, C.S.; Fayette, L.

    1994-01-01

    Options is a US Department of Energy/Pacific Northwest Laboratory (DOE/PNL) project whose goal is to assist Washington and Oregon middle schools having high percentages of students historically underrepresented in mathematics, science, and technology. The goal is to ensure that all students receive high-quality mathematics, science, and technology education throughout their middle school years. Teams of scientists work with teams of teachers from participating OPTIONS schools to initiate significant change in the manner in which science, mathematics, and technology are taught. As part of this effort, PNL scientists team up with teachers to develop curricula.

  16. High-resolution pollutant transport in the San Pedro Bay of California

    E-Print Network [OSTI]

    Cohan, Alexander; Wu, Jun; Dabdub, Donald

    2011-01-01

    pollutanttransportintheSanPedroBay ofCaliforniaCaliforniaInstituteofTechnology(UCICIT)three dimensional atmospheric chemical transport

  17. Assessing Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

  18. Hydrogen cooling options for MgB{sub 2}-based superconducting systems

    SciTech Connect (OSTI)

    Stautner, W.; Xu, M.; Mine, S.; Amm, K.

    2014-01-29

    With the arrival of MgB{sub 2} for low-cost superconducting magnets, hydrogen cooling has become an interesting alternative to costly liquid helium. Hydrogen is generally regarded as the most efficient coolant in cryogenics and, in particular, is well suited for cooling superconducting magnets. Cooling methods need to take into account the specific quench propagation in the MgB{sub 2} magnet winding and facilitate a cryogenically reliable and safe cooling environment. The authors propose three different multi-coolant options for MRI scanners using helium or hydrogen within the same design framework. Furthermore, a design option for whole-body scanners which employs technology, components, fueling techniques and safety devices from the hydrogen automotive industry is presented, continuing the trend towards replacing helium with hydrogen as a safe and cost efficient coolant.

  19. AC System Equipment Specification, Installation and Operational Options for Improved Indoor Humidity Control

    E-Print Network [OSTI]

    Shirey, D. B.

    2008-01-01

    Specification, Installation and Operational Options for Improved Indoor Humidity Control Don B. Shirey, III Program Manager Florida Solar Energy Center Cocoa, Florida ABSTRACT High-efficiency home designs have significantly reduced sensible...: Florida Solar Energy Center. James, P., J.E. Cummings, J. Sonne, R. Vieira, J. Klongerbo. 1997. The Effect of Residential Equipment Capacity on Energy Use, Demand, and Run-Time, FSEC-PF-328-97. Cocoa, FL: Florida Solar Energy Center. Lennox...

  20. What's the Option?

    E-Print Network [OSTI]

    Traeger, Christian

    2013-01-01

    option value. Second, the real options literature developed1994) spread the work on real options analysis to a broadis known as the real options approach. Translated into our

  1. Waste Heat Management Options for Improving Industrial Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heat Management Options for Improving Industrial Process Heating Systems Waste Heat Management Options for Improving Industrial Process Heating Systems This presentation covers...

  2. Local Option- Sales and Use Tax Exemption for Renewable Energy Systems

    Broader source: Energy.gov [DOE]

    Eligible renewable energy property is defined as "any fixture, product, system, device or interacting group of devices that produce electricity from renewable resources, including, but not limite...

  3. Electric, Gas, and Electric/Gas Energy Options for Cold-Air HVAC Systems

    E-Print Network [OSTI]

    Meckler, G.

    1989-01-01

    An important aspect of the design of cost-effective HVAC systems today is (a) sensitivity to the cost impact of the interplay of utility demand charges, time-of-day rates, gas rates, and gas/electric utility incentive programs vis--vis HVAC system...

  4. Evaluating Domestic Hot Water Distribution System Options With Validated Analysis Models

    SciTech Connect (OSTI)

    Weitzel, E.; Hoeschele, M.

    2014-09-01

    A developing body of work is forming that collects data on domestic hot water consumption, water use behaviors, and energy efficiency of various distribution systems. A full distribution system developed in TRNSYS has been validated using field monitoring data and then exercised in a number of climates to understand climate impact on performance. This study builds upon previous analysis modelling work to evaluate differing distribution systems and the sensitivities of water heating energy and water use efficiency to variations of climate, load, distribution type, insulation and compact plumbing practices. Overall 124 different TRNSYS models were simulated. Of the configurations evaluated, distribution losses account for 13-29% of the total water heating energy use and water use efficiency ranges from 11-22%. The base case, an uninsulated trunk and branch system sees the most improvement in energy consumption by insulating and locating the water heater central to all fixtures. Demand recirculation systems are not projected to provide significant energy savings and in some cases increase energy consumption. Water use is most efficient with demand recirculation systems, followed by the insulated trunk and branch system with a central water heater. Compact plumbing practices and insulation have the most impact on energy consumption (2-6% for insulation and 3-4% per 10 gallons of enclosed volume reduced). The results of this work are useful in informing future development of water heating best practices guides as well as more accurate (and simulation time efficient) distribution models for annual whole house simulation programs.

  5. Assessment of solar options for small power systems applications. Volume III. Analysis of concepts

    SciTech Connect (OSTI)

    Laity, W.W.; Aase, D.T.; Apley, W.J.; Bird, S.P.; Drost, M.K.; Garrett-Price, B.A.; Williams, T.A.

    1980-09-01

    A comparative analysis of solar thermal conversion concepts that are potentially suitable for development as small electric power systems (1 to 10 MWe) is given. Seven generic types of collectors, together with associated subsystems for electric power generation, were considered. The collectors can be classified into three categories: (1) two-axis tracking (with compound-curvature reflecting surfaces; (2) one-axis tracking (with single-curvature reflecting suraces; and (3) nontracking (with low-concentration reflecting surfaces). All seven collectors were analyzed in conceptual system configurations with Rankine-cycle engines. In addition, two of the collectors (the Point Focus Central Receiver and the Point Focus Distributed Receiver) were analyzed with Brayton-cycle engines, and the latter of the two also was analyzed with Stirling-cycle engines. This volume describes the systems analyses performed on all the alternative configurations of the seven generic collector concepts and the results obtained. The SOLSTEP computer code used to determine each configuration's system cost and performance is briefly described. The collector and receiver performance calculations used are also presented. The capital investment and related costs that were obtained from the systems studies are presented, and the levelized energy costs are given as a function of capacity factor obtained from the systems studies. Included also are the values of the other attributes used in the concepts' final ranking. The comments, conclusions, and recommendations developed by the PNL study team during the concept characterization and systems analysis tasks of the study are presented. (WHK)

  6. A Comparison of Coolant Options for Brayton Power Conversion Heat Rejection Systems

    SciTech Connect (OSTI)

    Siamidis, John [Thermal Energy Conversion Branch, Analex Corporation, 21000 Brookpark Rd., Cleveland, OH, 44135 (United States); Mason, Lee [Thermal Energy Conversion Branch, NASA Glenn Research Center, 21000 Brookpark Rd., Cleveland, OH, 44135 (United States)

    2006-01-20

    This paper describes potential heat rejection design concepts for Brayton power conversion systems. Brayton conversion systems are currently under study by NASA for Nuclear Electric Propulsion (NEP) and surface power applications. The Brayton Heat Rejection Subsystem (HRS) must dissipate waste heat generated by the power conversion system due to inefficiencies in the thermal-to-electric conversion process. Sodium potassium (NaK) and H2O are two coolant working fluids that have been investigated in the design of a pumped loop and heat pipe space HRS. In general NaK systems are high temperature (300 to 1000 K) low pressure systems, and H2O systems are low temperature (300 to 600 K) high pressure systems. NaK is an alkali metal with health and safety hazards that require special handling procedures. On the other hand, H2O is a common fluid, with no health hazards and no special handling procedures. This paper compares NaK and H2O for the HRS pumped loop coolant working fluid. A detailed excel analytical model, HRS{sub O}pt, was developed to evaluate the various HRS design parameters. It is capable of analyzing NaK or H2O coolant, parallel or series flow configurations, and numerous combinations of other key parameters (heat pipe spacing, diameter and radial flux, radiator facesheet thickness, fluid duct system pressure drop, system rejected power, etc.) of the HRS. This paper compares NaK against water for the HRS coolant working fluid with respect to the relative mass, performance, design and implementation issues between the two fluids.

  7. Evaluating Domestic Hot Water Distribution System Options with Validated Analysis Models

    SciTech Connect (OSTI)

    Weitzel, E.; Hoeschele, E.

    2014-09-01

    A developing body of work is forming that collects data on domestic hot water consumption, water use behaviors, and energy efficiency of various distribution systems. Transient System Simulation Tool (TRNSYS) is a full distribution system developed that has been validated using field monitoring data and then exercised in a number of climates to understand climate impact on performance. In this study, the Building America team built upon previous analysis modeling work to evaluate differing distribution systems and the sensitivities of water heating energy and water use efficiency to variations of climate, load, distribution type, insulation and compact plumbing practices. Overall, 124 different TRNSYS models were simulated. The results of this work are useful in informing future development of water heating best practices guides as well as more accurate (and simulation time efficient) distribution models for annual whole house simulation programs.

  8. Dynamic Programming and Graph Algorithms in Computer Vision Pedro F. Felzenszwalb and Ramin Zabih

    E-Print Network [OSTI]

    Field, David

    : Combinatorial Algorithms, Vision and Scene Understanding, Artificial Intelligence, Computing Methodologies 1Dynamic Programming and Graph Algorithms in Computer Vision Pedro F. Felzenszwalb and Ramin Zabih, and has been successfully applied to many vision problems. Discrete optimization techniques are especially

  9. Pedro M. Castro Iiro Harjunkoski Ignacio E. Grossmann Lisbon, Portugal Ladenburg, Germany Pittsburgh, USA

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    utilities, electrical power Availability Price Challenging aspect of plant scheduling Current practice Location of event points unknown a priori Electricity pricing & availability Product due dates LocationPedro M. Castro Iiro Harjunkoski Ignacio E. Grossmann Lisbon, Portugal Ladenburg, Germany

  10. An Analysis of Motor System Optimization Options- A Question of Diminishing Return on Investment

    E-Print Network [OSTI]

    Wroblewski, R. G.; Herro, M.; Schiebel, S.; Waffenschmidt, D.

    1997-01-01

    This paper presents the verified results of a pump system optimization project at a major midwestern brewery. A 150-horsepower "sweet water" pump circulates a glycol/water solution to cool tanks of beer during fermentation. To keep the pump from...

  11. WELFARE MEASURES TO REFLECT HOME LOCATION OPTIONS WHEN1 TRANSPORTATION SYSTEMS ARE MODIFIED2

    E-Print Network [OSTI]

    Kockelman, Kara M.

    of residential location choice is fundamental to behavioral5 models of land use, and, ultimately, travel demand (or willingness-to-pay) impacts of system23 changes by bringing residential location choice by home price shifts. Automobile costs play a more important role in32 residential location choices

  12. Safeguard Application Options for the Laser-Based Item Monitoring System (LBIMS)

    SciTech Connect (OSTI)

    Laughter, Mark D [ORNL

    2008-10-01

    Researchers at Oak Ridge National Laboratory (ORNL) are developing a Laser-Based Item Monitoring System (LBIMS) for advanced safeguards at nuclear facilities. LBIMS uses a low-power laser transceiver to monitor the presence and position of items with retroreflective tags. The primary advantages of LBIMS are its scalability to continuously monitor a wide range of items, its ability to operate unattended, its low cost of implementation, and its inherent information security due to its line-of-sight and non-broadcasting operation. The primary proposed safeguard application of LBIMS is described in its name: item monitoring. LBIMS could be implemented in a storage area to continuously monitor containers of nuclear material and the area in which they are stored. The system could be configured to provide off-site notification if any of the containers are moved or removed or if the area is accessed. Individual tags would be used to monitor storage containers, and additional tags could be used to record information regarding secondary storage units and room access. The capability to register small changes in tag position opens up the possibility of several other uses. These include continuously monitoring piping arrangements for design information verification or recording equipment positions for other safeguards systems, such as tracking the opening and closing of autoclaves as part of a cylinder tracking system or opening and closing valves on a sample or product take-off line. Combined with attribute tags, which transmit information from any kind of sensor by modulating the laser signal, LBIMS provides the capability to wirelessly and securely collect safeguards data, even in areas where radio-frequency or other wireless communication methods are not practicable. Four application types are described in this report: static item monitoring, in-process item monitoring with trigger tags, multi-layered integration with trigger tags, and line-of-sight data transfer with attribute tags. Field trials for each of these applications are described.

  13. Communication Needs and Integration Options

    E-Print Network [OSTI]

    Communication Needs and Integration Options for AMI in the Smart Grid Future Grid Initiative White System #12;Communication Needs and Integration Options for AMI in the Smart Grid Prepared for the Project the current state of communications for the advanced metering infrastructure (AMI) and recommends

  14. Options Impacting the Electric System of the Future (ESF); NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Cory, Karlynn

    2015-08-10

    As utilities are faced with adapting to new technologies, technology and policy due diligence are necessary to ensure the development of a future grid that brings greater value to utilities and their consumers. This presentation explores the different kinds of future directions the power industry could consider to create, discussing key components necessary for success. It will also discuss the practical application and possible strategies for utilities and innovators to implement smart technologies that will enable an ultimate intelligent grid capable of two-way communication, interoperability, and greater efficiency and system resiliency.

  15. Initial Business Case Analysis of Two Integrated Heat Pump HVAC Systems for Near-Zero-Energy Homes -- Update to Include Analyses of an Economizer Option and Alternative Winter Water Heating Control Option

    SciTech Connect (OSTI)

    Baxter, Van D

    2006-12-01

    The long range strategic goal of the Department of Energy's Building Technologies (DOE/BT) Program is to create, by 2020, technologies and design approaches that enable the construction of net-zero energy homes at low incremental cost (DOE/BT 2005). A net zero energy home (NZEH) is a residential building with greatly reduced needs for energy through efficiency gains, with the balance of energy needs supplied by renewable technologies. While initially focused on new construction, these technologies and design approaches are intended to have application to buildings constructed before 2020 as well resulting in substantial reduction in energy use for all building types and ages. DOE/BT's Emerging Technologies (ET) team is working to support this strategic goal by identifying and developing advanced heating, ventilating, air-conditioning, and water heating (HVAC/WH) technology options applicable to NZEHs. Although the energy efficiency of heating, ventilating, and air-conditioning (HVAC) equipment has increased substantially in recent years, new approaches are needed to continue this trend. Dramatic efficiency improvements are necessary to enable progress toward the NZEH goals, and will require a radical rethinking of opportunities to improve system performance. The large reductions in HVAC energy consumption necessary to support the NZEH goals require a systems-oriented analysis approach that characterizes each element of energy consumption, identifies alternatives, and determines the most cost-effective combination of options. In particular, HVAC equipment must be developed that addresses the range of special needs of NZEH applications in the areas of reduced HVAC and water heating energy use, humidity control, ventilation, uniform comfort, and ease of zoning. In FY05 ORNL conducted an initial Stage 1 (Applied Research) scoping assessment of HVAC/WH systems options for future NZEHs to help DOE/BT identify and prioritize alternative approaches for further development. Eleven system concepts with central air distribution ducting and nine multi-zone systems were selected and their annual and peak demand performance estimated for five locations: Atlanta (mixed-humid), Houston (hot-humid), Phoenix (hot-dry), San Francisco (marine), and Chicago (cold). Performance was estimated by simulating the systems using the TRNSYS simulation engine (Solar Energy Laboratory et al. 2006) in two 1800-ft{sup 2} houses--a Building America (BA) benchmark house and a prototype NZEH taken from BEopt results at the take-off (or crossover) point (i.e., a house incorporating those design features such that further progress towards ZEH is through the addition of photovoltaic power sources, as determined by current BEopt analyses conducted by NREL). Results were summarized in a project report, HVAC Equipment Design options for Near-Zero-Energy Homes--A Stage 2 Scoping Assessment, ORNL/TM-2005/194 (Baxter 2005). The 2005 study report describes the HVAC options considered, the ranking criteria used, and the system rankings by priority. In 2006, the two top-ranked options from the 2005 study, air-source and ground-source versions of an integrated heat pump (IHP) system, were subjected to an initial business case study. The IHPs were subjected to a more rigorous hourly-based assessment of their performance potential compared to a baseline suite of equipment of legally minimum efficiency that provided the same heating, cooling, water heating, demand dehumidification, and ventilation services as the IHPs. Results were summarized in a project report, Initial Business Case Analysis of Two Integrated Heat Pump HVAC Systems for Near-Zero-Energy Homes, ORNL/TM-2006/130 (Baxter 2006). The present report is an update to that document. Its primary purpose is to summarize results of an analysis of the potential of adding an outdoor air economizer operating mode to the IHPs to take advantage of free cooling (using outdoor air to cool the house) whenever possible. In addition it provides some additional detail for an alternative winter water heating/space heating (WH/S

  16. I. Electronic Voting Systems--Is Brazil Ahead of its Time?

    E-Print Network [OSTI]

    Rivest, Ronald L.

    CONTENTS I. Electronic Voting Systems-- Is Brazil Ahead of its Time? II. Misassessment of Security. Electronic Voting Systems--Is Brazil Ahead of its Time? Pedro A.D. Rezende A B S T R A C T The first article;Electronic Voting Systems Is Brazil ahead of its time? Pedro A. D. Rezende Department of Computer Science

  17. Maryland Efficiency Program Options

    Broader source: Energy.gov [DOE]

    Maryland Efficiency Program Options, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  18. TORIC GEOMETRY AND THE SEMPLE-NASH MODIFICATION PEDRO D. GONZALEZ PEREZ AND BERNARD TEISSIER

    E-Print Network [OSTI]

    Gonzlez Prez, Pedro Daniel

    TORIC GEOMETRY AND THE SEMPLE-NASH MODIFICATION PEDRO D. GONZALEZ PEREZ AND BERNARD TEISSIER. In the second part this is used to show that iterating the Semple-Nash modification or its characteristic]. If the field is of characteristic zero, this blowing-up is isomor- phic to the Semple-Nash modification. Recall

  19. Mining Knowledge-Sharing Sites for Viral Marketing Matthew Richardson and Pedro Domingos

    E-Print Network [OSTI]

    Domingos, Pedro

    Mining Knowledge-Sharing Sites for Viral Marketing Matthew Richardson and Pedro Domingos Department,pedrod}@cs.washington.edu ABSTRACT Viral marketing takes advantage of networks of influence among customers to inexpensively achieve marketing plan. Knowledge-sharing sites, where customers review products and advise each other

  20. Deploying Google Search by Voice in Cantonese Yun-Hsuan Sung, Martin Jansche, Pedro J. Moreno

    E-Print Network [OSTI]

    Cortes, Corinna

    was launched in December 2010. Index Terms: voice search, Cantonese speech recognition, mul- tilingual speech to speak search queries instead of entering Chinese characters on mobile devices. We believe ourDeploying Google Search by Voice in Cantonese Yun-Hsuan Sung, Martin Jansche, Pedro J. Moreno

  1. ROM-less RNS-to-binary converter moduli Pedro Miguens Matutino

    E-Print Network [OSTI]

    Sousa, Leonel

    ROM-less RNS-to-binary converter moduli {22 - 1, 22 + 1, 2 - 3, 2 + 3} Pedro Miguens Matutino ISEL--In this paper, a novel ROM-less RNS-to-binary converter is proposed, using a new balanced moduli set {22 - 1, 22 metric can be achieved for the full RNS architecture using the proposed moduli set. Keywords

  2. Evaluation of Seepage from an Embankment Dam Retaining Pedro J. Amaya1

    E-Print Network [OSTI]

    Evaluation of Seepage from an Embankment Dam Retaining Fly Ash Pedro J. Amaya1 ; John T. Massey of fly ash-laden seepage from the right abutment of an earthen dam are presented herein fly ash reached the level of the prior landslide, the fly ash-laden seepage migrated through

  3. Business-Specific Languages for Organizational Modeling Joo Paulo Pedro Mendes de Sousa Saraiva 1

    E-Print Network [OSTI]

    da Silva, Alberto Rodrigues

    Business-Specific Languages for Organizational Modeling Joo Paulo Pedro Mendes de Sousa Saraiva 1, there are many languages for business modeling, such as UML, BPMN and EPBE, which are well suited to describe. In business user- models, those concepts are usually only present as element names, and thus the modeling tool

  4. Submarine landslides of San Pedro Escarpment, southwest of Long Beach, California

    E-Print Network [OSTI]

    New Hampshire, University of

    failures and active faults, either of which could have generated a tsunami, are known on the shelf anticlinorium. The Palos Verdes slide could potentially have generated a failure- related tsunami and slope near Long Beach. Large slope failures are present on the San Pedro Escarpment and on the basin

  5. Natural Gas Purchasing Options

    E-Print Network [OSTI]

    Watkins, G.

    1988-01-01

    As a result of economic and regulatory changes, the natural gas marketplace now offers multiple options for purchasers. The purpose of this panel is to discuss short-term purchasing options and how to take advantage of these options both to lower...

  6. Approximating European Options by Rebate Barrier Options

    E-Print Network [OSTI]

    Song, Qingshuo

    2011-01-01

    When the underlying stock price is a strict local martingale process under an equivalent local martingale measure, Black-Scholes PDE associated with an European option may have multiple solutions. In this paper, we study an approximation for the smallest hedging price of such an European option. Our results show that a class of rebate barrier options can be used for this approximation, when its rebate and barrier are chosen appropriately. An asymptotic convergence rate is also achieved when the knocked-out barrier moves to infinity under suitable conditions.

  7. Retrieval options study

    SciTech Connect (OSTI)

    Not Available

    1980-03-01

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval; (same as emplacement, variably slower depending on repository/canister condition).

  8. Communication Needs and Integration Options

    E-Print Network [OSTI]

    consumer participation in the smart grid. It describes the motivation for AMI, surveys the current stateCommunication Needs and Integration Options for AMI in the Smart Grid Future Grid Initiative White Paper Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy

  9. Algoritmo de Viso para Humanos Virtuais Pedro Semio, Maria Beatriz Carmo, Ana Paula Cludio

    E-Print Network [OSTI]

    Carmo, Maria Beatriz

    Algoritmo de Visão para Humanos Virtuais Pedro Semião, Maria Beatriz Carmo, Ana Paula Cláudio algoritmo de visão sintética, baseado em ray casting, integrado nesta plataforma. Através deste algoritmo um de algoritmos de visão. Na secção 2, identificam-se os tipos de soluções encontradas na literatura

  10. Security is Not an Option | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security is Not an Option Security is Not an Option A 10-year roadmap for achieving control system cyber security in the energy industry has been hailed as a model for other...

  11. Analysis of sustainable water supply options for Kuwait

    E-Print Network [OSTI]

    Murtaugh, Katharine A. (Katharine Ann)

    2006-01-01

    This thesis considers several options for improving the sustainability of Kuwait's water supply system. The country currently relies heavily on desalination and brackish groundwater extraction. The options considered for ...

  12. Design Evolution Study - Aging Options

    SciTech Connect (OSTI)

    P. McDaniel

    2002-04-05

    The purpose of this study is to identify options and issues for aging commercial spent nuclear fuel received for disposal at the Yucca Mountain Mined Geologic Repository. Some early shipments of commercial spent nuclear fuel to the repository may be received with high-heat-output (younger) fuel assemblies that will need to be managed to meet thermal goals for emplacement. The capability to age as much as 40,000 metric tons of heavy metal of commercial spent nuclear he1 would provide more flexibility in the design to manage this younger fuel and to decouple waste receipt and waste emplacement. The following potential aging location options are evaluated: (1) Surface aging at four locations near the North Portal; (2) Subsurface aging in the permanent emplacement drifts; and (3) Subsurface aging in a new subsurface area. The following aging container options are evaluated: (1) Complete Waste Package; (2) Stainless Steel inner liner of the waste package; (3) Dual Purpose Canisters; (4) Multi-Purpose Canisters; and (5) New disposable canister for uncanistered commercial spent nuclear fuel. Each option is compared to a ''Base Case,'' which is the expected normal waste packaging process without aging. A Value Engineering approach is used to score each option against nine technical criteria and rank the options. Open issues with each of the options and suggested future actions are also presented. Costs for aging containers and aging locations are evaluated separately. Capital costs are developed for direct costs and distributable field costs. To the extent practical, unit costs are presented. Indirect costs, operating costs, and total system life cycle costs will be evaluated outside of this study. Three recommendations for aging commercial spent nuclear fuel--subsurface, surface, and combined surface and subsurface are presented for further review in the overall design re-evaluation effort. Options that were evaluated but not recommended are: subsurface aging in a new subsurface area (high cost); surface aging in the complete waste package (risk to the waste package and impact on the Waste Handling Facility); and aging in the stainless steel liner (impact on the waste package design and new high risk operations added to the waste packaging process). The selection of a design basis for aging will be made in conjunction with the other design re-evaluation studies.

  13. Evaluation of unthrottled combustion system options for light duty applications with future syncrude derived fuels. Alternative Fuels Utilization Program

    SciTech Connect (OSTI)

    Needham, J. R.; Cooper, B. M.; Norris-Jones, S. R.

    1982-12-01

    An experimental program examining the interaction between several fuel and light duty automotive engine combinations is detailed. Combustion systems addressed covered indirect and direct injection diesel and spark ignited stratified charge. Fuels primarily covered D2, naphtha and intermediate broadcut blends. Low ignition quality diesel fuels were also evaluated. The results indicate the baseline fuel tolerance of each combustion system and enable characteristics of the systems to be compared. Performance, gaseous and particulate emissions aspects were assessed. The data obtained assists in the selection of candidate combustion systems for potential future fuels. Performance and environmental penalties as appropriate are highlighted relative to the individual candidates. Areas of further work for increased understanding are also reviewed.

  14. Electricity Real Options Valuation

    E-Print Network [OSTI]

    Broszkiewicz-Suwaj, E

    2006-01-01

    In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

  15. Electricity Real Options Valuation

    E-Print Network [OSTI]

    Ewa Broszkiewicz-Suwaj

    2006-08-16

    In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

  16. Initial Business Case Analysis of Two Integrated Heat Pump HVAC Systems for Near-Zero-Energy Homes - Update to Include Evaluation of Impact of Including a Humidifier Option

    SciTech Connect (OSTI)

    Baxter, Van D

    2007-02-01

    The long range strategic goal of the Department of Energy's Building Technologies (DOE/BT) Program is to create, by 2020, technologies and design approaches that enable the construction of net-zero energy homes at low incremental cost (DOE/BT 2005). A net zero energy home (NZEH) is a residential building with greatly reduced needs for energy through efficiency gains, with the balance of energy needs supplied by renewable technologies. While initially focused on new construction, these technologies and design approaches are intended to have application to buildings constructed before 2020 as well resulting in substantial reduction in energy use for all building types and ages. DOE/BT's Emerging Technologies (ET) team is working to support this strategic goal by identifying and developing advanced heating, ventilating, air-conditioning, and water heating (HVAC/WH) technology options applicable to NZEHs. In FY05 ORNL conducted an initial Stage 1 (Applied Research) scoping assessment of HVAC/WH systems options for future NZEHs to help DOE/BT identify and prioritize alternative approaches for further development. Eleven system concepts with central air distribution ducting and nine multi-zone systems were selected and their annual and peak demand performance estimated for five locations: Atlanta (mixed-humid), Houston (hot-humid), Phoenix (hot-dry), San Francisco (marine), and Chicago (cold). Performance was estimated by simulating the systems using the TRNSYS simulation engine (Solar Energy Laboratory et al. 2006) in two 1800-ft{sup 2} houses--a Building America (BA) benchmark house and a prototype NZEH taken from BEopt results at the take-off (or crossover) point (i.e., a house incorporating those design features such that further progress towards ZEH is through the addition of photovoltaic power sources, as determined by current BEopt analyses conducted by NREL). Results were summarized in a project report, HVAC Equipment Design options for Near-Zero-Energy Homes--A Stage 2 Scoping Assessment, ORNL/TM-2005/194 (Baxter 2005). The 2005 study report describes the HVAC options considered, the ranking criteria used, and the system rankings by priority. In 2006, the two top-ranked options from the 2005 study, air-source and ground-source versions of a centrally ducted integrated heat pump (IHP) system, were subjected to an initial business case study. The IHPs were subjected to a more rigorous hourly-based assessment of their performance potential compared to a baseline suite of equipment of legally minimum efficiency that provided the same heating, cooling, water heating, demand dehumidification, and ventilation services as the IHPs. Results were summarized in a project report, Initial Business Case Analysis of Two Integrated Heat Pump HVAC Systems for Near-Zero-Energy Homes, ORNL/TM-2006/130 (Baxter 2006a). The present report is an update to that document which summarizes results of an analysis of the impact of adding a humidifier to the HVAC system to maintain minimum levels of space relative humidity (RH) in winter. The space RH in winter has direct impact on occupant comfort and on control of dust mites, many types of disease bacteria, and 'dry air' electric shocks. Chapter 8 in ASHRAE's 2005 Handbook of Fundamentals (HOF) suggests a 30% lower limit on RH for indoor temperatures in the range of {approx}68-69F based on comfort (ASHRAE 2005). Table 3 in chapter 9 of the same reference suggests a 30-55% RH range for winter as established by a Canadian study of exposure limits for residential indoor environments (EHD 1987). Harriman, et al (2001) note that for RH levels of 35% or higher, electrostatic shocks are minimized and that dust mites cannot live at RH levels below 40%. They also indicate that many disease bacteria life spans are minimized when space RH is held within a 30-60% range. From the foregoing it is reasonable to assume that a winter space RH range of 30-40% would be an acceptable compromise between comfort considerations and limitation of growth rates for dust mites and many bacteria. In addition it reports som

  17. Citrus Offers Year-Round Options

    E-Print Network [OSTI]

    Martin, Orin

    2008-01-01

    Centers Alan Chadwick Garden, offers ideas for choosing andSystems, UC Santa Cruz Citrus Offers Year-Round Options Tvarietal descriptions offer an idea of the wide range of

  18. Hedging With a Put Option

    E-Print Network [OSTI]

    Anderson, Carl; Smith, Jackie; McCorkle, Dean; O'Brien, Daniel

    1999-06-23

    Put options are a pricing tool with considerable flexibility for managing price risk. This publication discusses some put option basics, how put options work and how to use them.

  19. Information findability : an informal study to explore options for improving information findability for the systems analysis group.

    SciTech Connect (OSTI)

    Stoecker, Nora K.

    2014-03-01

    A Systems Analysis Group has existed at Sandia National Laboratories since at least the mid-1950s. Much of the groups work output (reports, briefing documents, and other materials) has been retained, along with large numbers of related documents. Over time the collection has grown to hundreds of thousands of unstructured documents in many formats contained in one or more of several different shared drives or SharePoint sites, with perhaps five percent of the collection still existing in print format. This presents a challenge. How can the group effectively find, manage, and build on information contained somewhere within such a large set of unstructured documents? In response, a project was initiated to identify tools that would be able to meet this challenge. This report documents the results found and recommendations made as of August 2013.

  20. Mathematics & Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    132 Mathematics & Statistics Degree options MMath (Single Honours Degrees) Mathematics Applied Mathematics Pure Mathematics Statistics BSc or MA (Single Honours Degrees) Mathematics Statistics [If you wish (Joint Honours Degrees) Mathematics and one of: Biology Chemistry Computer Science Economics Geography

  1. Mathematics & Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    122 Mathematics & Statistics Degree options MMath (Single Honours Degrees) Mathematics Applied Mathematics Pure Mathematics Statistics BSc or MA (Single Honours Degrees) Mathematics Statistics [If you wish (Joint Honours Degrees) Mathematics and one of: Biology Chemistry Computer Science Economics Statistics

  2. Physics & Astronomy Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    138 Physics & Astronomy Degree options BSc (Single Honours Degrees) Astrophysics Physics MPhys (Single Honours Degrees) Astrophysics Physics Theoretical Physics BSc (Joint Honours Degrees) Physics combinations is under review. MPhys (Joint Honours Degree) Theoretical Physics and Mathematics MSci (Joint

  3. Physics & Astronomy Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    148 Physics & Astronomy Degree options BSc (Single Honours Degrees) Astrophysics Physics MPhys (Single Honours Degrees) Astrophysics Physics Theoretical Physics BSc (Joint Honours Degrees) Physics) Theoretical Physics and Mathematics MSci (Joint Honours Degree) Physics and Chemistry Entrance Requirements

  4. PowerOptions RFP

    Broader source: Energy.gov [DOE]

    PowerOptions seeks proposals from qualified and experienced renewable energy project developers interested in providing renewable energy and Renewable Energy Credit (RECs) generated from renewable energy projects located in or deliverable to the ISO-NE.

  5. Biochemistry Career Options

    E-Print Network [OSTI]

    Walker, Lawrence R.

    Biochemistry Career Options applied researcher pharmaceutical researcher research chemist Testing and inspection professional MAJOR TO CAREER GUIDE B.S. Biochemistry College of Sciences www Program: M.S. in Biochemistry Our graduate programs offer exceptional research opportunities for advanced

  6. Biochemistry Career Options

    E-Print Network [OSTI]

    Walker, Lawrence R.

    Biochemistry Career Options applied researcher pharmaceutical researcher research chemist, geoscience, mathematical sciences, physics and astronomy, and water management. The college has created.S. in Water Resources Management Ph.D. in Radiochemistry Professional and Student Organizations: Biochemistry

  7. Lending Program Administration Options

    Broader source: Energy.gov [DOE]

    Lending program options and brief profiles of different approaches to clean energy lending are presented here. Each profile describes a different way to structure the various elements of a lending...

  8. Density-potential pairs for spherical stellar systems with Sersic light-profiles and (optional) power-law cores

    E-Print Network [OSTI]

    Balsa Terzic; Alister W. Graham

    2005-06-10

    Popular models for describing the luminosity-density profiles of dynamically hot stellar systems (e.g., Jaffe, Hernquist, Dehnen) were constructed with the desire to match the deprojected form of an R^{1/4} light-profile. Real galaxies, however, are now known to have a range of different light-profile shapes that scale with mass. Consequently, although highly useful, the above models have implicit limitations, and this is illustrated here through their application to a number of real galaxy density profiles. On the other hand, the analytical density profile given by Prugniel & Simien (1997) closely matches the deprojected form of Sersic R^{1/n} light-profiles - including deprojected exponential light-profiles. It is thus applicable for describing bulges in spiral galaxies, dwarf elliptical galaxies, and both ordinary and giant elliptical galaxies. Here we provide simple equations, in terms of elementary and special functions, for the gravitational potential and force associated with this density profile. Furthermore, to match galaxies with partially depleted cores, and better explore the supermassive black hole / galaxy connection, we have added a power-law core to this density profile and derived similar expressions for the potential and force of this hybrid profile. Expressions for the mass and velocity dispersion, assuming isotropy, are also given. These models may also prove appropriate for describing the dark matter distribution in halos formed from LCDM cosmological simulations.

  9. Options Study - Phase II

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2010-09-01

    The Options Study has been conducted for the purpose of evaluating the potential of alternative integrated nuclear fuel cycle options to favorably address the issues associated with a continuing or expanding use of nuclear power in the United States. The study produced information that can be used to inform decisions identifying potential directions for research and development on such fuel cycle options. An integrated nuclear fuel cycle option is defined in this study as including all aspects of the entire nuclear fuel cycle, from obtaining natural resources for fuel to the ultimate disposal of used nuclear fuel (UNF) or radioactive wastes. Issues such as nuclear waste management, especially the increasing inventory of used nuclear fuel, the current uncertainty about used fuel disposal, and the risk of nuclear weapons proliferation have contributed to the reluctance to expand the use of nuclear power, even though it is recognized that nuclear power is a safe and reliable method of producing electricity. In this Options Study, current, evolutionary, and revolutionary nuclear energy options were all considered, including the use of uranium and thorium, and both once-through and recycle approaches. Available information has been collected and reviewed in order to evaluate the ability of an option to clearly address the challenges associated with the current implementation and potential expansion of commercial nuclear power in the United States. This Options Study is a comprehensive consideration and review of fuel cycle and technology options, including those for disposal, and is not constrained by any limitations that may be imposed by economics, technical maturity, past policy, or speculated future conditions. This Phase II report is intended to be used in conjunction with the Phase I report, and much information in that report is not repeated here, although some information has been updated to reflect recent developments. The focus in this Options Study was to identify any nuclear fuel cycle technology or option that may result in a significant beneficial impact to the issues as compared to the current U.S. approach of once-through use of nuclear fuel in LWRs or similar reactors followed by direct disposal of UNF. This approach was taken because incremental differences may be difficult to clearly identify and justify due to the large uncertainties that can be associated with the specific causes of the issues. Phase II of this Options Study continued the review of nuclear fuel cycle options that was initiated and documented during Phase I, concentrating on reviewing and summarizing the potential of integrated nuclear fuel cycles. However, based on the reviews of previous studies and available data, it was not always possible to clearly determine sufficiently large differences between the various fuel cycle and technology options for some of the issues or evaluation measures, for example, in cases where only incremental differences with respect to the issues might be achieved regardless of the fuel cycle option or technologies being considered, or where differences were insufficient to clearly rise above the uncertainties.

  10. Edit Test Options Page 1 Edit Test Options

    E-Print Network [OSTI]

    Xu, Shouhuai

    Edit Test Options Page 1 Edit Test Options Format Test Information 1. Enter a Name for the Test. 2. Choose a color for the title text of the Test. (Optional) 3. Enter a Description in the Text Box. The description is visible to Students before they click on the link to take the Test. (Optional) 4. If you want

  11. Pawnee Nation Energy Option Analyses

    SciTech Connect (OSTI)

    Matlock, M.; Kersey, K.; Riding In, C.

    2009-07-31

    In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribes energy vision. The overarching goals of the first steps project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the best fit energy options. Based on the request of Pawnee Nations Energy Task Force the research team, consisting Tribal personnel and Summit Blue Consulting, focused on a review of renewable energy resource development potential, funding sources and utility organizational along with energy savings options. Elements of the energy demand forecasting and characterization and demand side options review remained in the scope of work, but were only addressed at a high level. Description of Activities Performed Renewable Energy Resource Development Potential The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Energy Efficiency Options While this was not a major focus of the project, the research team highlighted common strategies for reducing energy use in buildings. The team also discussed the benefits of adopting a building energy code and introduced two model energy codes Pawnee Nation should consider for adoption. Summary of Current and Expected Future Electricity Usage The research team provided a summary overview of electricity usage patterns in current buildings and included discussion of known plans for new construction. Utility Options Review Pawnee Nation electric utility options were analyzed through a four-phase process, which included: 1) summarizing the relevant utility background information; 2) gathering relevant utility assessment data; 3) developing a set of realistic Pawnee electric utility service options, and 4) analyzing the various Pawnee electric utility service options for the Pawnee Energy Teams consideration. III. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribes main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site.

  12. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01

    Coggeshall. 2008. Solar Photovoltaic Financing: DeploymentEconomics of Commercial Photovoltaic Systems in California.Financing Non-Residential Photovoltaic Projects: Options and

  13. Host nutrition alters the variance in parasite transmission Pedro F. Vale, Marc Choisy and Tom J. Little

    E-Print Network [OSTI]

    Obbard, Darren

    potential Host nutrition alters the variance in parasite transmission Pedro F. Vale, Marc Choisy://rsbl.royalsocietypublishing.org/content/suppl/2013/02/07/rsbl.2012.1145.DC1. "Data Supplement" References http in parasite transmission potential. Biol Lett 9: 20121145. http://dx.doi.org/10.1098/rsbl.2012.1145 Received

  14. The hydrogen hybrid option

    SciTech Connect (OSTI)

    Smith, J.R.

    1993-10-15

    The energy efficiency of various piston engine options for series hybrid automobiles are compared with conventional, battery powered electric, and proton exchange membrane (PEM) fuel cell hybrid automobiles. Gasoline, compressed natural gas (CNG), and hydrogen are considered for these hybrids. The engine and fuel comparisons are done on a basis of equal vehicle weight, drag, and rolling resistance. The relative emissions of these various fueled vehicle options are also presented. It is concluded that a highly optimized, hydrogen fueled, piston engine, series electric hybrid automobile will have efficiency comparable to a similar fuel cell hybrid automobile and will have fewer total emissions than the battery powered vehicle, even without a catalyst.

  15. Lighting Options for Homes.

    SciTech Connect (OSTI)

    Baker, W.S.

    1991-04-01

    This report covers many aspects of various lighting options for homes. Types of light sources described include natural light, artificial light, incandescent lamps, fluorescent lamps, and high intensity discharge lamps. A light source selection guide gives the physical characteristics of these, design considerations, and common applications. Color, strategies for efficient lighting, and types of lighting are discussed. There is one section giving tips for various situations in specific rooms. Rooms and types of fixtures are shown on a matrix with watts saved by using the recommended type lighting for that room and room location. A major emphasis of this report is saving energy by utilizing the most suitable, recommended lighting option. (BN)

  16. Idaho's Energy Options

    SciTech Connect (OSTI)

    Robert M. Neilson

    2006-03-01

    This report, developed by the Idaho National Laboratory, is provided as an introduction to and an update of the status of technologies for the generation and use of energy. Its purpose is to provide information useful for identifying and evaluating Idahos energy options, and for developing and implementing Idahos energy direction and policies.

  17. Sustainable Office Lighting Options

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Sustainable Office Lighting Options Task Lighting: Task lighting is a localized method of lighting a workspace so that additional, unnecessary lighting is eliminated, decreasing energy usage and costs. Illumination levels in the targeted work areas are higher with task lighting than with the ambient levels

  18. Art History Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    58 Art History Degree options MA (Single Honours Degree) Art History MA (Joint Honours Degrees) Art.st-andrews.ac.uk/study/international Do I need previous knowledge of this subject? No. Subject enquiries E: art the possibility of combining art-historical courses with those in a range of other subjects. * The School has

  19. Art History Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    66 Art History Degree options MA (Single Honours Degree) Art History MA (Joint Honours Degrees) Art knowledge of this subject? No. Subject enquiries E: art.history@st-andrews.ac.uk Features * The School for a learning and teaching review in March 2010. * The modular structure offers the possibility of combining art

  20. Computer Science Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    -leading research in human-computer interaction, constraint programming, cloud computing and more. * Our teaching74 Computer Science Degree options BSc (Single Honours Degree) Computer Science BSc (Joint Honours Degrees) Computer Science and one of: Economics Philosophy* Management Management Science * The title

  1. Computer Science Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    , cloud computing and more. * Our teaching is research-led from first year to fifth. Facilities82 Computer Science Degree options BSc (Single Honours Degree) Computer Science BSc (Joint Honours Degrees) Computer Science and one of: Economics Logic and Philosophy of Science Management Management

  2. Film Studies Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    102 Film Studies Degree options MA (Joint Honours Degrees) Film Studies and one of: Ancient History Anthropology SpanishW Theological Studies FilmStudieswww.st-andrews.ac.uk/filmstudies Features * The Department of Film Studies consistently receives excellent ratings of student satisfaction in course evaluations

  3. Film Studies Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    94 Film Studies Degree options MA (Single Honours Degrees) Film Studies MA (Joint Honours Degrees) Film Studies and one of: Ancient History Arabic Art History Biblical Studies Classical Studies Philosophy Psychology RussianW Scottish History Social Anthropology SpanishW Theological Studies Film

  4. Economics & Finance Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    90 Economics & Finance Degree options MA or BSc (Single Honours Degrees) Applied Economics Economics Financial Economics BA (International Honours Degree) Economics (See page 43) MA or BSc (Joint Honours Degrees) Economics and one of: Geography Management Mathematics MA (Joint Honours Degrees

  5. Economics & Finance Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    98 Economics & Finance Degree options MA or BSc (Single Honours Degrees) Applied Economics Economics Financial Economics BA (International Honours Degree) Economics (See page 51) MA or BSc (Joint Honours Degrees) Economics and one of: Geography Management Mathematics MA (Joint Honours Degrees

  6. A Plant-Level Simulation Model for Evaluating CO2 Capture Options

    E-Print Network [OSTI]

    systems Solids Management Ash pond Landfill Stacking Co-mixing Byproducts Boiler Types for CCS CO2 Capture Options PC Plants: - Amine systems (post-combustion) (w/optional aux. NG boiler

  7. Factors Affecting Option Premium Values

    E-Print Network [OSTI]

    Johnson, Jason; Smith, Jackie; Dhuyvetter, Kevin C.; Waller, Mark L.

    1999-06-23

    Values Jason Johnson, Jackie Smith, Kevin Dhuyvetter and Mark Waller* Put Options Hedging in the futures market with options is much like buying an insurance policy to protect commodity sellers against declining prices or buyers against ris- ing prices. A...

  8. Milk Futures, Options and Basis

    E-Print Network [OSTI]

    Haigh, Michael; Stockton, Matthew; Anderson, David P.; Schwart Jr., Robert B.

    2001-10-12

    The milk futures and options market enables producers and processors to manage price risk. This publication explains hedging, margin accounts, basis and how to track it, and other fundamentals of the futures and options market....

  9. The Window Strategy with Options

    E-Print Network [OSTI]

    McCorkle, Dean; Amosson, Stephen H.; Fausett, Marvin

    1999-06-23

    The window strategy is one of several marketing strategies using futures and options to establish a floor price and allow for upside price potential. It also reduces option premium costs. This publication discusses how the ...

  10. The safeguards options study

    SciTech Connect (OSTI)

    Hakkila, E.A.; Mullen, M.F.; Olinger, C.T.; Stanbro, W.D. [Los Alamos National Lab., NM (United States); Olsen, A.P.; Roche, C.T.; Rudolph, R.R. [Argonne National Lab., IL (United States); Bieber, A.M.; Lemley, J. [Brookhaven National Lab., Upton, NY (United States); Filby, E. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-04-01

    The Safeguards Options Study was initiated to aid the International Safeguards Division (ISD) of the DOE Office of Arms Control and Nonproliferation in developing its programs in enhanced international safeguards. The goal was to provide a technical basis for the ISD program in this area. The Safeguards Options Study has been a cooperative effort among ten organizations. These are Argonne National Laboratory, Brookhaven National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, Mound Laboratory, Oak Ridge National Laboratory, Pacific Northwest Laboratories, Sandia National Laboratories, and Special Technologies Laboratory. Much of the Motivation for the Safeguards Options Study is the recognition after the Iraq experience that there are deficiencies in the present approach to international safeguards. While under International Atomic Energy Agency (IAEA) safeguards at their declared facilities, Iraq was able to develop a significant weapons program without being noticed. This is because negotiated safeguards only applied at declared sites. Even so, their nuclear weapons program clearly conflicted with Iraq`s obligations under the Nuclear Nonproliferation Treaty (NPT) as a nonnuclear weapon state.

  11. Resources, real options, and corporate strategy

    E-Print Network [OSTI]

    Bernardo, Antonio; Chowdhry, Bhagwan

    1998-01-01

    211234 Resources, real options, and corporate strategy $D83; G30; G31 Keywords: Real options; Valuation; Corporateparticipants at the Real Options Conference at Northwestern

  12. A Laboratory Investigation of Deferral Options

    E-Print Network [OSTI]

    Oprea, Ryan; Friedman, Daniel; Anderson, Steven T

    2007-01-01

    T. and Antikarov, V. , 2003, Real Options: A Practitionerssteady state. Keywords: Real options, optimal stopping,email Introduction Real options theory came of age in the

  13. Sandia Energy - Nuclear Fuel Cycle Options Catalog

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Fuel Cycle Options Catalog Home Stationary Power Nuclear Fuel Cycle Nuclear Energy Workshops Nuclear Fuel Cycle Options Catalog Nuclear Fuel Cycle Options CatalogAshley...

  14. Sandia Energy - Nuclear Fuel Cycle Options Catalog

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fuel Cycle Options Catalog Home Stationary Power Nuclear Fuel Cycle Advanced Nuclear Energy Nuclear Fuel Cycle Options Catalog Nuclear Fuel Cycle Options CatalogAshley...

  15. Pawnee Nation Energy Option Analyses

    SciTech Connect (OSTI)

    Matlock, M.; Kersey, K.; Riding In, C.

    2009-07-21

    Pawnee Nation of Oklahoma Energy Option Analyses In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribes energy vision. The overarching goals of the first steps project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the best fit energy options. Description of Activities Performed The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribes main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site. Financial incentives for project development are generally structured to provide tribes with access to conventional financing mechanisms. Grant funding for project construction is currently difficult to obtain. Substantial new opportunities for bio-fuel development may exist in the next few years with passage of the 2007 Farm Bill, and through opportunities made available through Oklahomas new Bio-energy Center. A review of potential alternatives to Pawnee Nations current electricity supply scenario revealed that a range of options could be viable. These include the following scenarios: business as usual, alternative supply, negotiate lower rates with City of Pawnee, focus on reducing energy usage, develop electric utility organization. Under any circumstances, Pawnee Nation should purse strategies to reduce energy usage, as this is the simplest means of reducing electric costs and environmental impacts. The research team also recommends that Pawnee Nation initiate some focused discussions with the City of Pawnee, with GRDA, and with IEC to discuss its wholesale supply purchase options. These discussions will better inform the Pawnee Energy Team of the specific pros and cons of its wholesale power supply options, and will assist the Teams broader decision-making on utility-related issues. The ultimate path chosen by Pawnee Nation will depend on further consideration of priorities and potential barriers by Pawnee Nations Energy Team.

  16. Hanford 300 Area steam transition preliminary utility options study

    SciTech Connect (OSTI)

    Olson, N.J.; Weakley, S.A.; Berman, M.J.

    1995-06-01

    The cost of steam in the Hanford 300 Area is approaching $60 per million Btu; the cost in industry is {approx} $10 per million Btu. The cost of steam in the 300 Area is expected to continue to increase because of the age of the central steam system, load decreases, safety requirements, and environmental regulations. The intent of this report is to evaluate options that would more cost-effectively met the future heating needs of the buildings in the 300 Area. In general, the options fall into two categories: central systems and distributed systems. A representative option from each category was analyzed using the life-cycle cost analysis (LCCA) techniques mandated by the federal government. The central plant option chosen for evaluation was the existing central steam plant modified to allow continued operation. The distributed option chosen was a dedicated heating system for each building.

  17. Sandia Energy - Fuel Options

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust, High-Throughput Analysis ofSample SULIColinEnergy Policy ExpertsFuel Options Home

  18. Date Master's Student Non Thesis Option

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    1 Date Master's Student Ph.D.or Non Thesis Option (Professional Paper) Title Committee Members * = Chair (Co-chair) 3/23/1909 Peterson, James A. B.S. not thesis for Masters Trust Legislation. 3/24/1910 Jacobs, Lillian B.S. not thesis for Masters Monetary System of the United States. 3/28/1914 Richter

  19. High-Power Options for LANSCE

    SciTech Connect (OSTI)

    Garnett, Robert W.

    2011-01-01

    The LANSCE linear accelerator at Los Alamos National Laboratory has a long history of successful beam operations at 800 kW. We have recently studied options for restoration of high-power operations including approaches for increasing the performance to multi-MW levels. In this paper we will discuss the results of this study including the present limitations of the existing accelerating structures at LANSCE, and the high-voltage and RF systems that drive them. Several options will be discussed and a preferred option will be presented that will enable the first in a new generation of scientific facilities for the materials community. The emphasis of this new facility is 'Matter-Radiation Interactions in Extremes' (MaRIE) which will be used to discover and design the advanced materials needed to meet 21st century national security and energy security challenges.

  20. Platforms and Real Options in Large-Scale Engineering Konstantinos Kalligeros

    E-Print Network [OSTI]

    de Weck, Olivier L.

    Platforms and Real Options in Large-Scale Engineering Systems by Konstantinos Kalligeros Dipl teams to assess the value of real options in programs of large-scale, partially stan- dardized systems. A novel valuation process is introduced to value the developer's real options to choose among

  1. Sustainable Energy: Choosing Among Options

    E-Print Network [OSTI]

    Mirza, Umar Karim

    2006-01-01

    Review: Sustainable Energy: Choosing Among Options Byand William A. Peters. Sustainable Energy: Choosing AmongAll the authors of Sustainable Energy are associated with

  2. RTGs Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01

    A small spacecraft design for the Pluto Fast Flyby (PFF) Mission is under study by the Jet Propulsion Laboratory (JPL) for the National Aeronautics and Space Administration (NASA), for a possible launch as early as 1998. JPL's 1992 baseline design calls for a power source able to furnish an energy output of 3963 kWh and a power output of 69 watts(e) at the end of the 9.2-year mission. Satisfying those demands is made difficult because NASA management has set a goal of reducing the spacecraft mass from a baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for the power source. To support the ongoing NASA/JPL studies, the Department of Energy's Office of Special Applications (DOE/OSA) commissioned Fairchild Space to prepare and analyze conceptual designs of radioisotope power systems for the PFF mission. Thus far, a total of eight options employing essentially the same radioisotope heat source modules were designed and subjected to thermal, electrical, structural, and mass analyses by Fairchild. Five of these - employing thermoelectric converters - are described in the present paper, and three - employing free-piston Stirling converters - are described in the companion paper presented next. The system masses of the thermoelectric options ranged from 19.3 kg to 10.2 kg. In general, the options requiring least development are the heaviest, and the lighter options require more development with greater programmatic risk. There are four duplicate copies

  3. The RealGas and RealGasH2O Options of the TOUGH+ Code for the Simulation of Coupled Fluid and Heat Flow in Tight/Shale Gas Systems

    SciTech Connect (OSTI)

    Moridis, George; Freeman, Craig

    2013-09-30

    We developed two new EOS additions to the TOUGH+ family of codes, the RealGasH2O and RealGas . The RealGasH2O EOS option describes the non-isothermal two-phase flow of water and a real gas mixture in gas reservoirs, with a particular focus in ultra-tight (such as tight-sand and shale gas) reservoirs. The gas mixture is treated as either a single-pseudo-component having a fixed composition, or as a multicomponent system composed of up to 9 individual real gases. The RealGas option has the same general capabilities, but does not include water, thus describing a single-phase, dry-gas system. In addition to the standard capabilities of all members of the TOUGH+ family of codes (fully-implicit, compositional simulators using both structured and unstructured grids), the capabilities of the two codes include: coupled flow and thermal effects in porous and/or fractured media, real gas behavior, inertial (Klinkenberg) effects, full micro-flow treatment, Darcy and non-Darcy flow through the matrix and fractures of fractured media, single- and multi-component gas sorption onto the grains of the porous media following several isotherm options, discrete and fracture representation, complex matrix-fracture relationships, and porosity-permeability dependence on pressure changes. The two options allow the study of flow and transport of fluids and heat over a wide range of time frames and spatial scales not only in gas reservoirs, but also in problems of geologic storage of greenhouse gas mixtures, and of geothermal reservoirs with multi-component condensable (H2O and CH4) and non-condensable gas mixtures. The codes are verified against available analytical and semi-analytical solutions. Their capabilities are demonstrated in a series of problems of increasing complexity, ranging from isothermal flow in simpler 1D and 2D conventional gas reservoirs, to non-isothermal gas flow in 3D fractured shale gas reservoirs involving 4 types of fractures, micro-flow, non-Darcy flow and gas composition changes during production.

  4. SUSTAINABLE ENERGY UTILITY DESIGN: OPTIONS

    E-Print Network [OSTI]

    Delaware, University of

    SUSTAINABLE ENERGY UTILITY DESIGN: OPTIONS FOR THE CITY OF SEOUL FINAL REPORT TO SEOUL DEVELOPMENT INSTITUTE APRIL 2008 #12;#12;SUSTAINABLE ENERGY UTILITY DESIGN: OPTIONS FOR THE CITY OF SEOUL Final Report....................................................................................i 1. A New Model for Sustainable Energy Service Delivery.....................1 2. Learning form

  5. AFCI Options Study

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2009-09-01

    This report describes the background and framework for both organizing the discussion and providing information on the potential for nuclear energy R&D to develop alternative nuclear fuel cycles that would address the issues with the current implementations of nuclear power, including nuclear waste disposal, proliferation risk, safety, security, economics, and sustainability. The disposition of used fuel is the cause of many of the concerns, and the possible approaches to used fuel management identify a number of basic technology areas that need to be considered. The basic science in each of the technology areas is discussed, emphasizing what science is currently available, where scientific knowledge may be insufficient, and especially to identify specific areas where transformational discoveries may allow achievement of performance goals not currently attainable. These discussions lead to the wide range of technical options that have been the basis for past and current research and development on advanced nuclear fuel cycles in the United States. The results of this work are then briefly reviewed to show the extent to which such approaches are capable of addressing the issues with nuclear power, the potential for moving further, and the inherent limitations.

  6. Emission Changes Resulting from the San Pedro Bay, California Ports Truck Retirement Program

    SciTech Connect (OSTI)

    Bishop, G. A.; Schuchmann, B. G.; Stedman, D. H.; Lawson, D. R.

    2012-01-03

    Recent U.S. Environmental Protection Agency emissions regulations have resulted in lower emissions of particulate matter and oxides of nitrogen from heavy-duty diesel trucks. To accelerate fleet turnover the State of California in 2008 along with the Ports of Los Angeles and Long Beach (San Pedro Bay Ports) in 2006 passed regulations establishing timelines forcing the retirement of older diesel trucks. On-road emissions measurements of heavy-duty diesel trucks were collected over a three-year period, beginning in 2008, at a Port of Los Angeles location and an inland weigh station on the Riverside freeway (CA SR91). At the Port location the mean fleet age decreased from 12.7 years in April of 2008 to 2.5 years in May of 2010 with significant reductions in carbon monoxide (30%), oxides of nitrogen (48%) and infrared opacity (a measure of particulate matter, 54%). We also observed a 20-fold increase in ammonia emissions as a result of new, stoichiometrically combusted, liquefied natural gas powered trucks. These results compare with changes at our inland site where the average ages were 7.9 years in April of 2008 and 8.3 years in April of 2010, with only small reductions in oxides of nitrogen (10%) being statistically significant. Both locations have experienced significant increases in nitrogen dioxide emissions from new trucks equipped with diesel particle filters; raising the mean nitrogen dioxide to oxides of nitrogen ratios from less than 10% to more than 30% at the Riverside freeway location.

  7. A Real Option Approach to Valuation of Manufacturing Flexibility with 2 State Variables and Regime Switching

    E-Print Network [OSTI]

    Lee, Chi-Guhn

    A Real Option Approach to Valuation of Manufacturing Flexibility with 2 State Variables and Regime be reached at cglee@mie.utoronto.ca #12;Abstract We propose a real option approach to quantification. The manufacturing system has three options in capacity adjustment: capacity expansion from external sources

  8. Advanced Nuclear Fuel Cycle Options

    SciTech Connect (OSTI)

    Roald Wigeland; Temitope Taiwo; Michael Todosow; William Halsey; Jess Gehin

    2010-06-01

    A systematic evaluation has been conducted of the potential for advanced nuclear fuel cycle strategies and options to address the issues ascribed to the use of nuclear power. Issues included nuclear waste management, proliferation risk, safety, security, economics and affordability, and sustainability. The two basic strategies, once-through and recycle, and the range of possibilities within each strategy, are considered for all aspects of the fuel cycle including options for nuclear material irradiation, separations if needed, and disposal. Options range from incremental changes to todays implementation to revolutionary concepts that would require the development of advanced nuclear technologies.

  9. Patents and R& D as Real Options

    E-Print Network [OSTI]

    Schwartz, Eduardo S.

    2002-01-01

    Information Technology as Real Options, UCLA Working Paper.Patents and R&D as Real Options* September 2001 RevisedPatents and R&D as Real Options Abstract This article

  10. A real options approach to criminal careers

    E-Print Network [OSTI]

    Aguiar de Oliveira, Cristiano

    2012-01-01

    J. (2004) Criminal behavior: A real option approach with anTrigeorgis, L. (1996) Real Options. Cambridge: MIT Press.A real options approach to criminal careers Cristiano Aguiar

  11. VOLATILITY TIME AND PROPERTIES OF OPTION PRICES

    E-Print Network [OSTI]

    Janson, Svante

    VOLATILITY TIME AND PROPERTIES OF OPTION PRICES volatility time, to show convexity of option prices in the underlying asset if the contract function is convex as well as continuity and monotonicity of the option price in the volatility

  12. Montana State University 1 Geography Option

    E-Print Network [OSTI]

    Dyer, Bill

    Montana State University 1 Geography Option The Geography Option offers students a liberal university education with an emphasis in geography. The Geography option provides a general science (GIS). Geography also offers an outstanding background for more advanced education

  13. Hydrogen Delivery Infrastructure Options Analysis

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report, by the Nexant team, documents an in-depth analysis of seven hydrogen delivery options to identify the most cost-effective hydrogen infrastructure for the transition and long term. The pro

  14. Hydrogen Delivery Infrastructure Analysis, Options and Trade...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis, Options and Trade-offs, Transition and Long-term Hydrogen Delivery Infrastructure Analysis, Options and Trade-offs, Transition and Long-term Presentation on Hydrogen...

  15. Engineering Options Assessment Report. Nitrate Salt Waste Stream Processing

    SciTech Connect (OSTI)

    Anast, Kurt Roy

    2015-11-13

    This report examines and assesses the available systems and facilities considered for carrying out remediation activities on remediated nitrate salt (RNS) and unremediated nitrate salt (UNS) waste containers at Los Alamos National Laboratory (LANL). The assessment includes a review of the waste streams consisting of 60 RNS, 29 above-ground UNS, and 79 candidate below-ground UNS containers that may need remediation. The waste stream characteristics were examined along with the proposed treatment options identified in the Options Assessment Report . Two primary approaches were identified in the five candidate treatment options discussed in the Options Assessment Report: zeolite blending and cementation. Systems that could be used at LANL were examined for housing processing operations to remediate the RNS and UNS containers and for their viability to provide repackaging support for remaining LANL legacy waste.

  16. Engineering Options Assessment Report: Nitrate Salt Waste Stream Processing

    SciTech Connect (OSTI)

    Anast, Kurt Roy

    2015-11-18

    This report examines and assesses the available systems and facilities considered for carrying out remediation activities on remediated nitrate salt (RNS) and unremediated nitrate salt (UNS) waste containers at Los Alamos National Laboratory (LANL). The assessment includes a review of the waste streams consisting of 60 RNS, 29 aboveground UNS, and 79 candidate belowground UNS containers that may need remediation. The waste stream characteristics were examined along with the proposed treatment options identified in the Options Assessment Report . Two primary approaches were identified in the five candidate treatment options discussed in the Options Assessment Report: zeolite blending and cementation. Systems that could be used at LANL were examined for housing processing operations to remediate the RNS and UNS containers and for their viability to provide repackaging support for remaining LANL legacy waste.

  17. Proton Bunching Options

    SciTech Connect (OSTI)

    Palmer, R.B.

    2009-10-19

    Muon Colliders need intense, very short, proton bunches. The requirements are presented and a number of possible bunching systems discussed. The best solution uses a small super-conducting buncher ring with 6 bunches that are taken though separate transports and combined on the target.

  18. Advanced NTR options. [Ta

    SciTech Connect (OSTI)

    Davis, J.W.; Mills, J.C.; Glass, J.F.; Tu, W. (Rockwell International/Rocketdyne Division, 6633 Canoga Avenue, MS HB23 Canoga Park, California 81303 (US))

    1991-01-05

    Advanced NTR concepts which offer performance improvements over the ROVER/NERVA designs have been investigated. In addition, the deliverable performance of low pressure operation and materials issues have been investigated. Based on current experience, a maximum exit gas temperature of 3200 K is likely achievable with a ZrC based PBR design. At 3200 K a low pressure NTR would have marginal performance advantage (Isp) over a high pressure system. If tantalum or other high melting point carbides are used then an exit gas temperature of 3500 K may be feasible. At 3500 K low pressure operation offers more significant performance improvements which could outweigh associated size and mass penalties.

  19. Reprocessing option for spent fuel

    SciTech Connect (OSTI)

    Woolf, D.N. (British Nuclear Fuels PLC, Risley (United Kingdom))

    1991-11-01

    The options available to utilities for disposal of fuel discharged from their nuclear reactors is not limited to bury or burn. Many utilities in Europe and Japan have already opted to reprocess their spent fuel in the United Kingdom and/or France. This enables the utility to recycle the recovered uranium and plutonium and allows the utilities' countries to formulate a waste disposal policy without the time constraints that would otherwise be placed on them. This paper gives an insight into how and why British Nuclear Fuels plc (BNFL) is continuing to provide services to reprocess and recycle spent nuclear fuel. The closed fuel cycle represents the complete irradiated fuel management option and, with its use of well-established technologies, reprocessing of spent fuel is the only option that is available to utilities now.

  20. DEVELOPMENT OF AN ANTIFOAM TRACKING SYSTEM AS AN OPTION TO SUPPORT THE MELTER OFF-GAS FLAMMABILITY CONTROL STRATEGY AT THE DWPF

    SciTech Connect (OSTI)

    Edwards, T.; Lambert, D.

    2014-08-27

    The Savannah River National Laboratory (SRNL) has been working with the Savannah River Remediation (SRR) Defense Waste Processing Facility (DWPF) in the development and implementation of an additional strategy for confidently satisfying the flammability controls for DWPFs melter operation. An initial strategy for implementing the operational constraints associated with flammability control in DWPF was based upon an analytically determined carbon concentration from antifoam. Due to the conservative error structure associated with the analytical approach, its implementation has significantly reduced the operating window for processing and has led to recurrent Slurry Mix Evaporator (SME) and Melter Feed Tank (MFT) remediation. To address the adverse operating impact of the current implementation strategy, SRR issued a Technical Task Request (TTR) to SRNL requesting the development and documentation of an alternate strategy for evaluating the carbon contribution from antifoam. The proposed strategy presented in this report was developed under the guidance of a Task Technical and Quality Assurance Plan (TTQAP) and involves calculating the carbon concentration from antifoam based upon the actual mass of antifoam added to the process assuming 100% retention. The mass of antifoam in the Additive Mix Feed Tank (AMFT), in the Sludge Receipt and Adjustment Tank (SRAT), and in the SME is tracked by mass balance as part of this strategy. As these quantities are monitored, the random and bias uncertainties affecting their values are also maintained and accounted for. This report documents: 1) the development of an alternate implementation strategy and associated equations describing the carbon concentration from antifoam in each SME batch derived from the actual amount of antifoam introduced into the AMFT, SRAT, and SME during the processing of the batch. 2) the equations and error structure for incorporating the proposed strategy into melter off-gas flammability assessments. Sample calculations of the system are also included in this report. Please note that the system developed and documented in this report is intended as an alternative to the current, analytically-driven system being utilized by DWPF; the proposed system is not intended to eliminate the current system. Also note that the system developed in this report to track antifoam mass in the AMFT, SRAT, and SME will be applicable beyond just Sludge Batch 8. While the model used to determine acceptability of the SME product with respect to melter off-gas flammability controls must be reassessed for each change in sludge batch, the antifoam mass tracking methodology is independent of sludge batch composition and as such will be transferable to future sludge batches.

  1. Undergraduate Day Majors and Options Division of Academic Affairs

    E-Print Network [OSTI]

    Salvaggio, Carl

    Technology* Environmental Sustainability, Health and Safety Manufacturing Engineering Technology* MechanicalRobotics Option Industrial Engineering Industrial EngineeringErgonomics Option Industrial EngineeringLean Six Sigma Option Industrial EngineeringManufacturing Option Industrial EngineeringSix Sigma Option

  2. School of Medicine Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    126 School of Medicine Medicine Degree options BSc (Single Honours Degree) Medicine Entrance level. HNC Applied Sciences`Pathway to Medicine'at Perth College The School of Medicine has formed at St Andrews. More information can be found on the School of Medicine webpages or from Perth College T

  3. School of Medicine Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    136 School of Medicine Medicine Degree options BSc (Single Honours Degree) Medicine Entrance Applied Sciences`Pathway to Medicine'at Perth College The School of Medicine has formed a partnership Andrews. More information can be found on the School of Medicine web pages ( http://medicine

  4. Information Engineering Option (paper 8) Photo Editing and Image Search

    E-Print Network [OSTI]

    Ghahramani, Zoubin

    , and act on it. #12;Information Engineering Year 3 (Part IIA) Modules · 3F1 Signals and systems · 3F2 systems · 3F6 Software engineering and design #12;Information Engineering Year 4 (Part IIB) Modules · 4F1Information Engineering Option (paper 8) Photo Editing and Image Search Part C - Image Searching

  5. Application of Spatial Data Modeling and Geographical Information Systems (GIS) for Identification of Potential Siting Options for Various Electrical Generation Sources

    SciTech Connect (OSTI)

    Mays, Gary T; Belles, Randy; Blevins, Brandon R; Hadley, Stanton W; Harrison, Thomas J; Jochem, Warren C; Neish, Bradley S; Omitaomu, Olufemi A; Rose, Amy N

    2012-05-01

    Oak Ridge National Laboratory (ORNL) initiated an internal National Electric Generation Siting Study, which is an ongoing multiphase study addressing several key questions related to our national electrical energy supply. This effort has led to the development of a tool, OR-SAGE (Oak Ridge Siting Analysis for power Generation Expansion), to support siting evaluations. The objective in developing OR-SAGE was to use industry-accepted approaches and/or develop appropriate criteria for screening sites and employ an array of Geographic Information Systems (GIS) data sources at ORNL to identify candidate areas for a power generation technology application. The initial phase of the study examined nuclear power generation. These early nuclear phase results were shared with staff from the Electric Power Research Institute (EPRI), which formed the genesis and support for an expansion of the work to several other power generation forms, including advanced coal with carbon capture and storage (CCS), solar, and compressed air energy storage (CAES). Wind generation was not included in this scope of work for EPRI. The OR-SAGE tool is essentially a dynamic visualization database. The results shown in this report represent a single static set of results using a specific set of input parameters. In this case, the GIS input parameters were optimized to support an economic study conducted by EPRI. A single set of individual results should not be construed as an ultimate energy solution, since US energy policy is very complex. However, the strength of the OR-SAGE tool is that numerous alternative scenarios can be quickly generated to provide additional insight into electrical generation or other GIS-based applications. The screening process divides the contiguous United States into 100 x 100 m (1-hectare) squares (cells), applying successive power generation-appropriate site selection and evaluation criteria (SSEC) to each cell. There are just under 700 million cells representing the contiguous United States. If a cell meets the requirements of each criterion, the cell is deemed a candidate area for siting a specific power generation form relative to a reference plant for that power type. Some SSEC parameters preclude siting a power plant because of an environmental, regulatory, or land-use constraint. Other SSEC assist in identifying less favorable areas, such as proximity to hazardous operations. All of the selected SSEC tend to recommend against sites. The focus of the ORNL electrical generation source siting study is on identifying candidate areas from which potential sites might be selected, stopping short of performing any detailed site evaluations or comparisons. This approach is designed to quickly screen for and characterize candidate areas. Critical assumptions supporting this work include the supply of cooling water to thermoelectric power generation; a methodology to provide an adequate siting footprint for typical power plant applications; a methodology to estimate thermoelectric plant capacity while accounting for available cooling water; and a methodology to account for future ({approx}2035) siting limitations as population increases and demands on freshwater sources change. OR-SAGE algorithms were built to account for these critical assumptions. Stream flow is the primary thermoelectric plant cooling source evaluated in this study. All cooling was assumed to be provided by a closed-cycle cooling (CCC) system requiring makeup water to account for evaporation and blowdown. Limited evaluations of shoreline cooling and the use of municipal processed water (gray) cooling were performed. Using a representative set of SSEC as input to the OR-SAGE tool and employing the accompanying critical assumptions, independent results for the various power generation sources studied were calculated.

  6. Depleted uranium disposal options evaluation

    SciTech Connect (OSTI)

    Hertzler, T.J.; Nishimoto, D.D.; Otis, M.D. [Science Applications International Corp., Idaho Falls, ID (United States). Waste Management Technology Div.

    1994-05-01

    The Department of Energy (DOE), Office of Environmental Restoration and Waste Management, has chartered a study to evaluate alternative management strategies for depleted uranium (DU) currently stored throughout the DOE complex. Historically, DU has been maintained as a strategic resource because of uses for DU metal and potential uses for further enrichment or for uranium oxide as breeder reactor blanket fuel. This study has focused on evaluating the disposal options for DU if it were considered a waste. This report is in no way declaring these DU reserves a ``waste,`` but is intended to provide baseline data for comparison with other management options for use of DU. To PICS considered in this report include: Retrievable disposal; permanent disposal; health hazards; radiation toxicity and chemical toxicity.

  7. Radioisotope Stirling Generator Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01

    The preceding paper described conceptual designs and analytical results for five Radioisotope Thermoelectric Generator (RTG) options for the Pluto Fast Flyby (PFF) mission, and the present paper describes three Radioisotope Stirling Generator (RSG) options for the same mission. The RSG options are based on essentially the same radioisotope heat source modules used in previously flown RTGs and on designs and analyses of a 75-watt free-piston Stirling engine produced by Mechanical Technology Incorporated (MTI) for NASA's Lewis Research Center. The integrated system design options presented were generated in a Fairchild Space study sponsored by the Department of Energy's Office of Special Applications, in support of ongoing PFF mission and spacecraft studies that the Jet Propulsion Laboratory (JPL) is conducting for the National Aeronautics and Space Administration (NASA). That study's NASA-directed goal is to reduce the spacecraft mass from its baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for a power source able to deliver 69 watts(e) at the end of the 9.2-year mission. In general, the Stirling options were found to be lighter than the thermoelectric options described in the preceding paper. But they are less mature, requiring more development, and entailing greater programmatic risk. The Stirling power system mass ranged from 7.3 kg (well below the 10-kg goal) for a non-redundant system to 11.3 kg for a redundant system able to maintain full power if one of its engines fails. In fact, the latter system could deliver as much as 115 watts(e) if desired by the mission planners. There are 5 copies in the file.

  8. Radioisotope Stirling Generator Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    2012-01-19

    The preceding paper described conceptual designs and analytical results for five Radioisotope Thermoelectric Generator (RTG) options for the Pluto Fast Flyby (PFF) mission, and the present paper describes three Radioisotope Stirling Generator (RSG) options for the same mission. The RSG options are based on essentially the same radioisotope heat source modules used in previously flown RTGs and on designs and analyses of a 75-watt free-piston Stirling engine produced by Mechanical Technology Incorporated (MTI) for NASA's Lewis Research Center. The integrated system design options presented were generated in a Fairchild Space study sponsored by the Department of Energy's Office of Special Applications, in support of ongoing PFF mission and spacecraft studies that the Jet Propulsion Laboratory (JPL) is conducting for the National Aeronautics and Space Administration (NASA). That study's NASA-directed goal is to reduce the spacecraft mass from its baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for a power source able to deliver 69 watts(e) at the end of the 9.2-year mission. In general, the Stirling options were found to be lighter than the thermoelectric options described in the preceding paper. But they are less mature, requiring more development, and entailing greater programmatic risk. The Stirling power system mass ranged from 7.3 kg (well below the 10-kg goal) for a non-redundant system to 11.3 kg for a redundant system able to maintain full power if one of its engines fails. In fact, the latter system could deliver as much as 115 watts(e) if desired by the mission planners. There are 2 copies in the file.

  9. JUMP DIFFUSION OPTION WITH TRANSACTION COSTS

    E-Print Network [OSTI]

    Mocioalca, Oana

    JUMP DIFFUSION OPTION WITH TRANSACTION COSTS "non-systematic" risk, inclusive of transaction costs. We compute the total transac- tion costs and the turnover for different options, transaction costs, and revision intervals

  10. Smart Modules for Lighting System Applications and Power Quality Measurements.

    E-Print Network [OSTI]

    Hirche, Sandra

    , Guilherme M. Soares, Thiago R. F. Mendona, Pedro S. Almeida, Henrique A. C. Braga Electrical Engineering system and coupling sensors to the module, it's possible to gather data regarding the power grid as well, such as adaptive dimming, allowing to vary the light intensity of the lamp in accordance with time, weather or just

  11. Valuation of Information Technology Investments as Real Options

    E-Print Network [OSTI]

    Schwartz, Eduardo S.; Zozaya-Gorostiza, Carlos

    2000-01-01

    1999) A Case for Using Real Options Pricing Analysis toExpansion Using Real Options Analysis. MIS Quarterly. Vol.Investment Opportunities as Real Options: Getting Started on

  12. Automated Surface Observing System: Standby Power Options

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    contained group of sensors and data gathering equipment that produces an automated weather observation * Weather observations support aviation, climate data, non government...

  13. Current Comparison of Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Steven J. Piet; B. W. Dixon; A. Goldmann; R. N. Hill; J. J. Jacobson; G. E. Matthern; J. D. Smith; A. M. Yacout

    2006-03-01

    The nuclear fuel cycle includes mining, enrichment, nuclear power plants, recycling (if done), and residual waste disposition. The U.S. Advanced Fuel Cycle Initiative (AFCI) has four program objectives to guide research on how best to glue these pieces together, as follows: waste management, proliferation resistance, energy recovery, and systematic management/economics/safety. We have developed a comprehensive set of metrics to evaluate fuel cycle options against the four program objectives. The current list of metrics is long-term heat, long-term dose, radiotoxicity and weapons usable material. This paper describes the current metrics and initial results from comparisons made using these metrics. The data presented were developed using a combination of static calculations and a system dynamic model, DYMOND. In many cases, we examine the same issue both dynamically and statically to determine the robustness of the observations. All analyses are for the U.S. reactor fleet. This work aims to clarify many of the issues being discussed within the AFCI program, including Inert Matrix Fuel (IMF) versus Mixed Oxide (MOX) fuel, single-pass versus multi-pass recycling, thermal versus fast reactors, and the value of separating cesium and strontium. The results from a series of dynamic simulations evaluating these options are included in this report. The model interface includes a few control knobs for flying or piloting the fuel cycle system into the future. The results from the simulations show that the future is dark (uncertain) and that the system is sluggish with slow time response times to changes (i.e., what types of reactors are built, what types of fuels are used, and the capacity of separation and fabrication plants). Piloting responsibilities are distributed among utilities, government, and regulators, compounding the challenge of making the entire system work and respond to changing circumstances. We identify four approaches that would increase our chances of a sustainable fuel cycle system: (1) have a recycle strategy that could be implemented before the 2030-2050 approximate period when current reactors retire so that replacement reactors fit into the strategy, (2) establish an option such as multi-pass blended-core IMF as a downward Pu control knob and accumulate waste management benefits early, (3) establish fast reactors with flexible conversion ratio as a future control knob that slowly becomes available if/when fast reactors are added to the fleet, and (4) expand exploration of heterogeneous assemblies and cores, which appear to have advantages such as increased agility. Initial results suggest multi-pass full-core MOX appears to be a less effective way than multi-pass blended core IMF to manage the fuel cycle system because it requires higher TRU throughput while accruing waste management benefits at a slower rate. Single-pass recycle approaches for LWRs do not meet AFCI program objectives and could be considered a dead end. We did not study the Very High Temperature Reactor (VHTR). Fast reactors appear to be effective options but a significant number of fast reactors must be deployed before the benefit of such strategies can be observed.

  14. Hybrid lattice and decision analysis of real options : application to a supply chain strategy

    E-Print Network [OSTI]

    Quispez-Asin, Nestor

    2008-01-01

    In many real world systems, two types of uncertainties exist: those that evolve in small, continuous increments and those that may create large, discrete changes in the system. The field of engineering real options posits ...

  15. Hierarchical classification with reject option for live fish recognition

    E-Print Network [OSTI]

    Fisher, Bob

    Hierarchical classification with reject option for live fish recognition Phoenix X. Huang@inf.ed.ac.uk Robert B. Fisher University of Edinburgh rbf@inf.ed.ac.uk Abstract A live fish recognition system. We present a novel Balance-Enforced Optimized Tree with Reject op- tion (BEOTR) for live fish

  16. Climate change mitigation through forestry measures: potentials, options, practice

    E-Print Network [OSTI]

    Climate change mitigation through forestry measures: potentials, options, practice Robert Matthews KINGDOM #12;18 May 2010 Climate change mitigation and forestry measures What I will cover Inherent;18 May 2010 Climate change mitigation and forestry measures GHG dynamics in forest systems Emissions

  17. Exit Options and Dividend Policy under Liquidity Constraints

    E-Print Network [OSTI]

    Murto, Pauli; Tervi, Marko

    2009-01-01

    optimal exercise of real options. Boyle and Guthrie (2003)described by the standard real option model of optimal exit.

  18. Using Real Options to Manage Condition-Based Maintenance Enabled by PHM

    E-Print Network [OSTI]

    Sandborn, Peter

    . PHM potentially enables performance based logistics, condition-based maintenance, and reduced lifeUsing Real Options to Manage Condition-Based Maintenance Enabled by PHM Gilbert Haddad, Peter-component; decision support system; maintenance optimization, real options; economic analysis; post

  19. Assessment for advanced fuel cycle options in CANDU

    SciTech Connect (OSTI)

    Morreale, A.C.; Luxat, J.C. [McMaster University, 1280 Main St. W. Hamilton, Ontario, L8S 4L7 (Canada); Friedlander, Y. [AMEC-NSS Ltd., 700 University Ave. 4th Floor, Toronto, Ontario, M5G 1X6 (Canada)

    2013-07-01

    The possible options for advanced fuel cycles in CANDU reactors including actinide burning options and thorium cycles were explored and are feasible options to increase the efficiency of uranium utilization and help close the fuel cycle. The actinide burning TRUMOX approach uses a mixed oxide fuel of reprocessed transuranic actinides from PWR spent fuel blended with natural uranium in the CANDU-900 reactor. This system reduced actinide content by 35% and decreased natural uranium consumption by 24% over a PWR once through cycle. The thorium cycles evaluated used two CANDU-900 units, a generator and a burner unit along with a driver fuel feedstock. The driver fuels included plutonium reprocessed from PWR, from CANDU and low enriched uranium (LEU). All three cycles were effective options and reduced natural uranium consumption over a PWR once through cycle. The LEU driven system saw the largest reduction with a 94% savings while the plutonium driven cycles achieved 75% savings for PWR and 87% for CANDU. The high neutron economy, online fuelling and flexible compact fuel make the CANDU system an ideal reactor platform for many advanced fuel cycles.

  20. Model-based Estimation of Flexibility and Optionability in an Integrated Real Options Framework

    E-Print Network [OSTI]

    Mikaelian, Tsoline

    Uncertainties can be managed through real options that provide a decision maker the right, but not the obligation, to exercise actions at a later time. In previous work we introduced an integrated real options framework ...

  1. Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity Service

    E-Print Network [OSTI]

    @IEOR.Berkeley.edu Abstract In a competitive electricity market traditional demand side management options offering customers demand for electricity. Most interruptible service contracts offered alternative warning times. Tariff TCombining Financial Double Call Options with Real Options for Early Curtailment of Electricity

  2. BACHELOR OF SCIENCE BIOLOGY GENERAL OPTION

    E-Print Network [OSTI]

    Kemp, Brian M.

    * OR 201 Physics 4 hrs. PHYSICS 102* OR 202 Physics 4 hrs. General Biology Option Requirements: CellBACHELOR OF SCIENCE BIOLOGY GENERAL OPTION A Bachelor of Science degree from Washington State Requirements: Grade BIOLOGY 106 General Biology 4 hrs. BIOLOGY 107 General Biology 4 hrs. BIOLOGY 301 General

  3. Zinc Bromide Waste Solution Treatment Options

    SciTech Connect (OSTI)

    Langston, C.A.

    2001-01-16

    The objective of this effort was to identify treatment options for 20,000 gallons of low-level radioactively contaminated zinc bromide solution currently stored in C-Area. These options will be relevant when the solutions are declared waste.

  4. Equity Options and Stochastic Interest Rates1

    E-Print Network [OSTI]

    Ouwehand, Peter

    M Acott February 14, 2006 1 The financial assistance of the Department of Labour (DoL) towards risk of equity options except around the Optimal Exercise Boundary of American options, but displays enhanced convexity (i.e. `Gamma'-type risks) over the stochastic interest rate model. #12;Acknowledgements

  5. Art: Graphic Design Option 1 (page 1)

    E-Print Network [OSTI]

    Elzanowski, Marek

    Art: Graphic Design Option 1 (page 1) Option 2 (page 2) Bachelor of Science 201516 Degree Maps Freshman Inquiry 5 Freshman Inquiry 5 Freshman Inquiry 5 ART 115 4 ART 131 4 ART 118 4 ARH 204 or ARH 205 4 ART 182 or ART 117 4 ART 120 4 ARH 206 4 Total Credits 13 Total

  6. Art: Graphic Design Option 1 (page 1)

    E-Print Network [OSTI]

    Elzanowski, Marek

    Art: Graphic Design Option 1 (page 1) Option 2 (page 2) Bachelor of Arts 201516 Degree Maps Milestones: Complete ART 118 & 120 (by spring term). ARH 206 recommended during summer term. Freshman Foreign Language 103 4 ART 115 4 ART 131 4 ART 118 4 ARH 204 or ARH 205 4 ART 182 or ART 117

  7. What drives option prices? Frdric Abergel1

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    . The study reveals that while the modeling of stochastic volatility gives more robust models, the market does 2 Theoretical framework 4 3 Intraday joint dynamics of option and underlying prices 5 3.1 EppsWhat drives option prices? Frdric Abergel1 and Riadh Zaatour2 Chair of Quantitative Finance Ecole

  8. Montana State University 1 Film Option

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Montana State University 1 Film Option Students in the Film Option gain hands have opportunities to engage in film production throughout the program, starting in the first year and culminating in a senior thesis film project. At the same time, students study film history, film aesthetics

  9. Montana State University 1 Geology Option

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Montana State University 1 Geology Option The Geology Option is a degree program designed and private sectors in fields such as petroleum geology, mining geology, seismology (including earthquake and volcanic risk assessment), hydrology (surface and ground water) natural-hazard geology, environmental clean

  10. Target Volatility Option Pricing Giuseppe Di Graziano

    E-Print Network [OSTI]

    Macrina, Andrea

    for the pricing of Target Volatility Options (TVOs), a recent market innovation in the eld of volatility are lower than the target volatility, the pay-o of the former is higher than the pay-o of the corresponding experi- enced a steep increase, with a signicant impact on option (long vega) costs. The generalized

  11. Storage option an Analytic approach

    E-Print Network [OSTI]

    Dmitry Lesnik

    2012-05-28

    The mathematical problem of the static storage optimisation is formulated and solved by means of a variational analysis. The solution obtained in implicit form is shedding light on the most important features of the optimal exercise strategy. We show how the solution depends on different constraint types including carry cost and cycling constraint. We investigate the relation between intrinsic and stochastic solutions. In particular we give another proof that the stochastic problem has a "bang-bang" optimal exercise strategy. We also show why the optimal stochastic exercise decision is always close to the intrinsic one. In the second half we develop a perturbation analysis to solve the stochastic optimisation problem. The obtained approximate solution allows us to estimate the time value of the storage option. In particular we find an answer to rather academic question of asymptotic time value for the mean reversion parameter approaching zero or infinity. We also investigate the differences between swing and storage problems. The analytical results are compared with numerical valuations and found to be in a good agreement.

  12. Used nuclear fuel storage options including implications of small modular reactors

    E-Print Network [OSTI]

    Brinton, Samuel O. (Samuel Otis)

    2014-01-01

    This work addresses two aspects of the nuclear fuel cycle system with significant policy implications. The first is the preferred option for used fuel storage based on economics: local, regional or national storage. The ...

  13. Simulation of the nuclear fuel cycle with recycling : options and outcomes

    E-Print Network [OSTI]

    Silva, Rodney Busquim e

    2008-01-01

    A system dynamics simulation technique is applied to generate a new version of the CAFCA code to study the mass flow in the nuclear fuel cycle, and the impact of different options for advanced reactors and fuel recycling ...

  14. Sustainable Energy: Choosing Among Options

    E-Print Network [OSTI]

    Mirza, Umar Karim

    2006-01-01

    on environment and energy sustainability is given as well.an account of energy systems and sustainability metrics.

  15. Comments on implementation: Contingency options for chemical weapons demilitarization

    SciTech Connect (OSTI)

    Aroesty, J.

    1991-01-01

    The author discusses the need to formulate contingency options for complying with U.S./U.S.S.R. chemical weapon (C.W.) demilitarization timetables that start in 1992. These timetables could be overly optimistic in the face of emerging environmental concerns and potential political, technical, and operational difficulties. A similar approach may also be relevant to the situation in Iraq, where several years are likely to pass before a suitable C.W. destruction system is available for use.

  16. Weapons-grade plutonium dispositioning. Volume 2: Comparison of plutonium disposition options

    SciTech Connect (OSTI)

    Brownson, D.A.; Hanson, D.J.; Blackman, H.S. [and others

    1993-06-01

    The Secretary of Energy requested the National Academy of Sciences (NAS) Committee on International Security and Arms Control to evaluate disposition options for weapons-grade plutonium. The Idaho National Engineering Laboratory (INEL) offered to assist the NAS in this evaluation by investigating the technical aspects of the disposition options and their capability for achieving plutonium annihilation levels greater than 90%. This report was prepared for the NAS to document the gathered information and results from the requested option evaluations. Evaluations were performed for 12 plutonium disposition options involving five reactor and one accelerator-based systems. Each option was evaluated in four technical areas: (1) fuel status, (2) reactor or accelerator-based system status, (3) waste-processing status, and (4) waste disposal status. Based on these evaluations, each concept was rated on its operational capability and time to deployment. A third rating category of option costs could not be performed because of the unavailability of adequate information from the concept sponsors. The four options achieving the highest rating, in alphabetical order, are the Advanced Light Water Reactor with plutonium-based ternary fuel, the Advanced Liquid Metal Reactor with plutonium-based fuel, the Advanced Liquid Metal Reactor with uranium-plutonium-based fuel, and the Modular High Temperature Gas-Cooled Reactor with plutonium-based fuel. Of these four options, the Advanced Light Water Reactor and the Modular High Temperature Gas-Cooled Reactor do not propose reprocessing of their irradiated fuel. Time constraints and lack of detailed information did not allow for any further ratings among these four options. The INEL recommends these four options be investigated further to determine the optimum reactor design for plutonium disposition.

  17. Pricing and hedging a barrier option

    E-Print Network [OSTI]

    Bogossian, Alan

    2002-01-01

    . Monte-Carlo Simulations Many exotic derivatives, usually those that are path-dependent, cannot be computed using a closed form equation. As we have seen this, it is the case of barrier options with discontinuous barrier (daily or weekly barrier... would like to get the same price for the option each time we use the same parameter. This fact is really important in order to be able to measure the sensitivity of the option's price with respect to its determinants. A straightforward Monte Carlo...

  18. Economics of Alaska North Slope gas utilization options

    SciTech Connect (OSTI)

    Thomas, C.P.; Doughty, T.C.; Hackworth, J.H.; North, W.B.; Robertson, E.P.

    1996-08-01

    The recoverable natural gas available for sale in the developed and known undeveloped fields on the Alaskan North Slope (ANS) total about 26 trillion cubic feet (TCF), including 22 TCF in the Prudhoe Bay Unit (PBU) and 3 TCF in the undeveloped Point Thomson Unit (PTU). No significant commercial use has been made of this large natural gas resource because there are no facilities in place to transport this gas to current markets. To date the economics have not been favorable to support development of a gas transportation system. However, with the declining trend in ANS oil production, interest in development of this huge gas resource is rising, making it important for the U.S. Department of Energy, industry, and the State of Alaska to evaluate and assess the options for development of this vast gas resource. The purpose of this study was to assess whether gas-to-liquids (GTL) conversion technology would be an economic alternative for the development and sale of the large, remote, and currently unmarketable ANS natural gas resource, and to compare the long term economic impact of a GTL conversion option to that of the more frequently discussed natural gas pipeline/liquefied natural gas (LNG) option. The major components of the study are: an assessment of the ANS oil and gas resources; an analysis of conversion and transportation options; a review of natural gas, LNG, and selected oil product markets; and an economic analysis of the LNG and GTL gas sales options based on publicly available input needed for assumptions of the economic variables. Uncertainties in assumptions are evaluated by determining the sensitivity of project economics to changes in baseline economic variables.

  19. Declaration of Elective Option Department of Physics Student's Name: ______________________________ UIN _________________________________

    E-Print Network [OSTI]

    Lee, Tonghun

    Declaration of Elective Option Department of Physics Student's Name or Engineering Physics programs use this form to declare an elective option. The official list of elective options for your program is available here: LAS Science and Letters: http://physics

  20. Rolling Up a Put Option as Prices Increase

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-10-07

    Agricultural producers use put options to protect themselves against declining prices. The technique of "rolling up a put option, explained in this publication, allows the producer to raise the minimum expected selling price of a put option...

  1. VOLATILITY TIME AND PROPERTIES OF OPTION PRICES: A SUMMARY

    E-Print Network [OSTI]

    Janson, Svante

    VOLATILITY TIME AND PROPERTIES OF OPTION PRICES: A SUMMARY volatility time, to show convexity of option prices in the underlying asset if the contract function is convex as well as continuity and monotonicity of the option price in the volatility

  2. Training options for countering nuclear smuggling

    SciTech Connect (OSTI)

    Ball, D Y; Erickson, S A

    1999-07-01

    The burden of stopping a nuclear smuggling attempt at the border rests most heavily on the front-line customs inspector. He needs to know how to use the technological tools at his disposal, how to discern tell-tale anomalies in export documents and manifests, how to notice psychological signs of a smuggler's tension, and how to search anything that might hide nuclear material. This means that assistance in the counter-nuclear smuggling training of customs officers is one of the most critical areas of help that the United States can provide. This paper discusses the various modes of specialized training, both in the field and in courses, as well as the types of assistance that can be provided. Training for nuclear customs specialists, and supervisors and managers of nuclear smuggling detection systems is also important, and differs from front-line inspector training in several aspects. The limitations of training and technological tools such as expert centers that will overcome these limitations are also discussed. Training assistance planned by DOE/NN-43 to Russia within the Second Line of Defense program is discussed in the light of these options, and future possibilities for such training are projected.

  3. IE Courses and Options Presenters

    E-Print Network [OSTI]

    Sun, Yu

    Ergonomics and the Workplace (core) MIE345 Case Studies in Ergonomics (tech elective) MIE344 Ergonomic Design of Information Systems (tech elective) Year 4 MIE344 Ergonomic Design of Information Systems (tech elective) MIE345 Case Studies in Ergonomics (tech ele

  4. Real Options for Project Schedules (ROPS)

    E-Print Network [OSTI]

    Ingber, Lester

    2007-01-01

    Real Options for Project Schedules (ROPS) has three recursive sampling/optimization shells. An outer Adaptive Simulated Annealing (ASA) optimization shell optimizes parameters of strategic Plans containing multiple Projects containing ordered Tasks. A middle shell samples probability distributions of durations of Tasks. An inner shell samples probability distributions of costs of Tasks. PATHTREE is used to develop options on schedules.. Algorithms used for Trading in Risk Dimensions (TRD) are applied to develop a relative risk analysis among projects.

  5. Option values of low carbon technology policies

    E-Print Network [OSTI]

    Finon, Dominique; Meunier, Guy

    2012-06-19

    that should be installed in the first period is 1D and the production capacity that should be built in the second period is 2D . The demand is assumed inelastic in order to simplify the analytical model, this assumption is relaxed... to be a major option for reducing emissions from the electricity industry, which is the main emitting industrial sector. The most promising options are: carbon capture and storage (CCS), the new nuclear, solar thermal plants...

  6. Clean Energy Options for Sabah: An Analysis of Resource Availability...

    Open Energy Info (EERE)

    Clean Energy Options for Sabah: An Analysis of Resource Availability and Cost Jump to: navigation, search Name Clean Energy Options for Sabah: An Analysis of Resource Availability...

  7. Overview of Options to Integrate Stationary Power Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options to Integrate Stationary Power Generation from Fuel Cells with Hydrogen Demand for the Transportation Sector Overview of Options to Integrate Stationary Power Generation...

  8. Measurement and Verification Options for Federal Energy- and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options for Federal Energy- and Water-Saving Projects Measurement and Verification Options for Federal Energy- and Water-Saving Projects Federal Energy Management Program...

  9. A New Spectral Element Method for Pricing European Options ...

    E-Print Network [OSTI]

    2013-01-02

    Nov 11, 2011 ... equations for pricing European options under the BlackScholes and ... functions Option pricing BlackScholes Merton jump diffusion.

  10. On-Going Comparison of Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Steven J. Piet; Ralph G. Bennett; Brent W. Dixon; J. Stephen Herring; David E. Shropshire; Mark Roth; J. D. Smith; Robert Hill; James Laidler; Kemal Pasamehmetoglu

    2004-10-01

    The Advanced Fuel Cycle Initiative (AFCI) program is addressing key issues associated with critical national needs. This paper compares the major options with these major outcome objectives - waste geological repository capacity and cost, energy security and sustainability, proliferation resistance, fuel cycle economics, and safety as well as process objectives associated with readiness to proceed and adaptability and robustness in the face of uncertainties. Working together, separation, transmutation, and fuel technologies provide complete energy systems that can improve waste management compared to the current once-through/no separation approach. Future work will further increase confidence in potential solutions, optimize solutions for the mixtures of objectives, and develop attractive development and deployment paths for selected options. This will allow the nation to address nearer-term issues such as avoiding the need for additional geological repositories while making nuclear energy a more sustainable energy option for the long-term. While the Generation IV Initiative is exploring multiple reactor options for future nuclear energy for both electricity generation and additional applications, the AFCI is assessing fuel cycles options for either a continuation or expansion of nuclear energy in the United States. This report compares strategies and technology options for managing the associated spent fuel. There are four major potential strategies, as follows: The current U.S. strategy is once through: standard nuclear power plants, standard fuel burnup, direct geological disposal of spent fuel. Variants include higher burnup fuels in water-cooled power plants, once-through gas-cooled power plants, and separation (without recycling) of spent fuel to reduce the number and cost of geological waste packages. The second strategy is thermal recycle, recycling some fuel components in thermal reactors. This strategy extends the useful life of the geologic repository, producing energy from the fissile transuranics in spent fuel while reducing plutonium. The third strategy is thermal+fast recycle. The difference from the second strategy is that more components of spent fuel can be recycled to reduce both fissile and non-fissile transuranics, but at the cost of developing and deploying at least one fast reactor or accelerator driven system. A mix of thermal and fast reactors would implement this strategy. The fourth strategy is pure fast recycle; fuel would not be recycled in thermal reactors, which would be phased out in favor of deploying fast spectrum power reactors.

  11. Technology Options for a Fast Spectrum Test Reactor

    SciTech Connect (OSTI)

    D. M. Wachs; R. W. King; I. Y. Glagolenko; Y. Shatilla

    2006-06-01

    Idaho National Laboratory in collaboration with Argonne National Laboratory has evaluated technology options for a new fast spectrum reactor to meet the fast-spectrum irradiation requirements for the USDOE Generation IV (Gen IV) and Advanced Fuel Cycle Initiative (AFCI) programs. The US currently has no capability for irradiation testing of large volumes of fuels or materials in a fast-spectrum reactor required to support the development of Gen IV fast reactor systems or to demonstrate actinide burning, a key element of the AFCI program. The technologies evaluated and the process used to select options for a fast irradiation test reactor (FITR) for further evaluation to support these programmatic objectives are outlined in this paper.

  12. Energy options: Cogen V and retail wheeling alternatives technical conference

    SciTech Connect (OSTI)

    1996-12-31

    The Energy Options technical conference proceedings contains 265 papers, of which 17 were selected for the database. The conference was split into two primary topics: cogeneration and retail wheeling. Subtopics under cogeneration included: the state of cogeneration in the United States, case studies in facility ownership, fuels considerations for tomorrow, and plant design considerations for cogeneration systems. Retail wheeling alternatives subtopics included U.S. Federal Energy Regulatory Commission rulings, end-user options for retail wheeling, deregulation issues, and forecasting of electricity generating costs. Papers not selected for the database, while clearly pertinent topics of interest, consisted of viewgraphs which were judged not to have sufficient technical information and coherence without the corresponding presentation. However, some papers which did consist of viewgraphs were included.

  13. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.

  14. Diesel plant retrofitting options to enhance decentralized electricity supply in Indonesia

    SciTech Connect (OSTI)

    Baring-Gould, E.I.; Barley, C.D.; Drouilhet, S. [and others] [and others

    1997-09-01

    Over the last 20 years, the government of Indonesia has undertaken an extensive program to provide electricity to the population of that country. The electrification of rural areas has been partially achieved through the use of isolated diesel systems, which account for about 20% of the country`s generated electricity. Due to many factors related to inefficient power production with diesels, the National Renewable Energy Laboratory, in conjunction with PLN, the Indonesian national utility, Community Power Corporation, and Idaho Power Company, analyzed options for retrofitting existing diesel power systems. This study considered the use of different combinations of advanced diesel control, the addition of wind generators, photovoltaics and batteries to reduce the systems of overall cost and fuel consumption. This analysis resulted in a general methodology for retrofitting diesel power systems. This paper discusses five different retrofitting options to improve the performance of diesel power systems. The systems considered in the Indonesian analysis are cited as examples for the options discussed.

  15. IEEE TRANSACTIONS ON VERY LARGE SCALE INTEGRATION (VLSI) SYSTEMS, VOL. 23, NO. 3, MARCH 2015 603 Arithmetic-Based Binary-to-RNS Converter Modulo {2nk}

    E-Print Network [OSTI]

    Sousa, Leonel

    Arithmetic-Based Binary-to-RNS Converter Modulo {2n±k} for jn-Bit Dynamic Range Pedro Miguens Matutino-residue number system (RNS) conversion modulo {2n ±k} is proposed. This structure is based only on adders and constant multipliers. This brief is motivated by the existing {2n ± k} binary-to-RNS converters, which

  16. Hydrogen Production: Overview of Technology Options, January 2009

    Fuel Cell Technologies Publication and Product Library (EERE)

    Overview of technology options for hydrogen production, its challenges and research needs and next steps

  17. Hydrogen Production: Overview of Technology Options, January 2009

    SciTech Connect (OSTI)

    FreedomCAR and Fuel Partnership

    2009-01-15

    Overview of technology options for hydrogen production, its challenges and research needs and next steps

  18. PRICING AND HEDGING SPREAD OPTIONS RENE CARMONA AND VALDO DURRLEMAN

    E-Print Network [OSTI]

    Carmona, Rene

    a chance to venture in the poorly understood world of asset valuation and real options which are the objectPRICING AND HEDGING SPREAD OPTIONS REN´E CARMONA AND VALDO DURRLEMAN ABSTRACT. We survey the theoretical and the computational problems associated with the pricing of spread options. These options

  19. Renewable Energies program (6 credit hour) Option A: 11

    E-Print Network [OSTI]

    Simaan, Nabil

    Renewable Energies program (6 credit hour) Option A: 11 Option B: The program is organized by t Spanish Institute and the Asso program on renewable energy will provide students with advanced knowledge. opportunities: option A- two renewable energies; option B include on-site visits to renewable energy generation

  20. CHARACTERIZATION OF SURPLUS PLUTONIUM FOR DISPOSITION OPTIONS

    SciTech Connect (OSTI)

    Allender, J; Edwin Moore, E; Scott Davies, S

    2008-07-15

    The United States (U.S.) has identified 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Except for materials that remain in use for programs outside of national defense, including programs for nuclear-energy development, the surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. Some items will be disposed as transuranic waste, low-level waste, or spent fuel. The remaining surplus plutonium will be managed through: (1) the Mixed Oxide (MOX) Fuel Fabrication Facility (FFF), to be constructed at the Savannah River Site (SRS), where the plutonium will be converted to fuel that will be irradiated in civilian power reactors and later disposed to a high-level waste (HLW) repository as spent fuel; (2) the SRS H-Area facilities, by dissolving and transfer to HLW systems, also for disposal to the repository; or (3) alternative immobilization techniques that would provide durable and secure disposal. From the beginning of the U.S. program for surplus plutonium disposition, DOE has sponsored research to characterize the surplus materials and to judge their suitability for planned disposition options. Because many of the items are stored without extensive analyses of their current chemical content, the characterization involves three interacting components: laboratory sample analysis, if available; non-destructive assay data; and rigorous evaluation of records for the processing history for items and inventory groups. This information is collected from subject-matter experts at inventory sites and from materials stabilization and surveillance programs, in cooperation with the design agencies for the disposition facilities. This report describes the operation and status of the characterization program.

  1. Evaluating Information Presentation Strategies for Spoken Dialogue Systems

    E-Print Network [OSTI]

    Winterboer, Andi

    2009-01-01

    A common task for spoken dialogue systems (SDS) is to help users select a suitable option (e.g., flight, hotel, restaurant) from the set of options available. When the number of options is small, they can simply be ...

  2. Probability Background Black Scholes for European Call/Put Options Risk-Neutral Measure American Options and Duality Mathematical Finance

    E-Print Network [OSTI]

    Morrow, James A.

    -Neutral Measure American Options and Duality Definition A stochastic process is a family (Xt ) of real valuedProbability Background Black Scholes for European Call/Put Options Risk-Neutral Measure American Options and Duality Mathematical Finance Option Pricing under the Risk-Neutral Measure Cory Barnes

  3. EIS-0123: Direct Service Industry Options

    Broader source: Energy.gov [DOE]

    BPA proposes to implement one or more options to reduce load fluctuations and revenue uncertainty resulting from its electrical service to 10 aluminum smelters and its other direct service industrial customers. BPA believes these options will give BPA greater ability to plan for power needs and help to maintain its relatively strong financial position during the current period of power surplus. They also are expected to enhance BPA's ability to repay the U.S. Treasury. In turn, BPA rates to other customers would stabilize.

  4. 2015 Version BCom option in Management

    E-Print Network [OSTI]

    Xia, Xuhua

    1370 ADM 3301 Operations Management F ADM 2302, ADM 2304 * ADM 3302 Supply Chain Management W ADM 3301 1000, 2000 & 3000 * ADM 4303 Quality Management W ADM 3301 ADM 4311 Strategic Management F All ADM core2015 Version BCom option in Management MANDATORY COURSE SEQUENCE FIRST YEAR (30 credits) Code

  5. Pilot Plant Options for the MFE Roadmap

    E-Print Network [OSTI]

    Pilot Plant Options for the MFE Roadmap Hutch Neilson Princeton Plasma Physics Laboratory International Workshop MFE Roadmapping for the ITER Era Princeton, NJ 10 September 2011 #12;Outline 2 Pilot plant mission, motivation, and description. Role of pilot plants on the Roadmap to Demo. Pilot Plant

  6. Power Blackout Risks Risk Management Options

    E-Print Network [OSTI]

    Schrijver, Karel

    Power Blackout Risks Risk Management Options Emerging Risk Initiative Position Paper November 2011 #12;2 Content 1. Summary 3 2. Power blackouts challenge society and economy 4 3. Blackout risks on the increase 5 3.1. How power market trends influence blackout risks 5 3.1.1. Liberalisation and privatisation

  7. Understanding Leasing Options for Energy Projects

    E-Print Network [OSTI]

    Davenport, B.

    2005-01-01

    stream_source_info ESL-IE-05-05-50.pdf.txt stream_content_type text/plain stream_size 759 Content-Encoding UTF-8 stream_name ESL-IE-05-05-50.pdf.txt Content-Type text/plain; charset=UTF-8 UNDERSTANDING LEASING OPTIONS...

  8. 2015 Version BCom option in Marketing

    E-Print Network [OSTI]

    Xia, Xuhua

    2015 Version BCom option in Marketing MANDATORY COURSE SEQUENCE FIRST YEAR (30 credits) Code Course ADM 2304 Applications of Statistical Methods in Business W ADM 2303 ADM 2320 Marketing F/W ADM 1300 Business Ethics F/W ADM 3321 Consumer Behaviour F/W ADM 2320 ADM 3322 Services Marketing F/W ADM 2320 ADM

  9. Test Preparation Options Free Test Prep Websites

    E-Print Network [OSTI]

    Stowell, Michael

    Test Preparation Options Free Test Prep Websites ACT: http: http://www.collegeboard.com/student/testing/sat/prep_one/test.html http://www.number2.com://testprep.princetonreview.com/CourseSearch/Search.aspx?itemCode=17&productType=F&rid=1&zip=803 02 Test Prep Classes Front Range Community College: Classes

  10. Revenue Management: A Real Options Approach

    E-Print Network [OSTI]

    Marcotte, Patrice

    The University of Western Ontario, London, Ontario, Canada, N6A 3K7 canderson@ivey.ca M. Davison and H. Rasmussen Department of Applied Mathematics The University of Western Ontario, London, Ontario, Canada,N6A 5B7 January. Industries: transportation - car rentals and airlines. 1 #12;Revenue Management: A Real Options Approach

  11. EXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS

    E-Print Network [OSTI]

    deregulated electricity markets have shown very little demand elasticity. Price spikes have reached $7000EXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS RAJNISH KAMAT and SHMUEL S. OREN of financial contracts for the supply and procurement of interruptible electricity service. While the contract

  12. BACHELOR OF SCIENCE IN CHEMISTRY BIOCHEMISTRY OPTION

    E-Print Network [OSTI]

    Hardy, Christopher R.

    OF SCIENCE IN CHEMISTRY BIOCHEMISTRY OPTION RECOMMENDED PROGRAM (1) FIRST SEMESTER SECOND SEMESTER CHEM 111 SEMESTER EIGHTH SEMESTER CHEM 326 Biochemistry I 4.0 CHEM 327 Biochemistry II 4.0 CHEM 487 Chemistry Seminar 0.5 CHEM 328 Anal Biochemistry Lab 1.0 CHEM ____ Chemistry Elective*** 2.0 CHEM 465 Analytical

  13. GEOLOGY, B.S.G. ENVIRONMENTAL OPTION

    E-Print Network [OSTI]

    Hamburger, Peter

    GEOLOGY, B.S.G. ENVIRONMENTAL OPTION (Fall 2015-Summer 2016) IPFW Residency Requirements: ____ 32/Gen Ed GEOLOGY BSG CORE COURSES (66 credits) *Note: grades of C- or better required in GEOL courses/2.0 GPA ______ 3 - 5 Credits in Geology or Geography with Laboratory (Select 1 of the following): ___3

  14. GEOLOGY, B.S.G. GEOLOGY OPTION

    E-Print Network [OSTI]

    Hamburger, Peter

    GEOLOGY, B.S.G. GEOLOGY OPTION (Fall 2015-Summer 2016) IPFW Residency Requirements: ____ 32 credits GEOLOGY BSG CORE COURSES (66 credits) *Note: grades of C- or better required in GEOL courses/2.0 GPA ______ 3 - 5 Credits in Geology or Geography with Laboratory (Select 1 of the following): ___3 GEOL G103

  15. |Sustainable energy choices: comparing the options

    E-Print Network [OSTI]

    for addressing these growing service demands, each of which has its attractions. Energy efficiency reduces are not renewable, but the resource can endure for centuries and is a high quality form of energy that can7 |Sustainable energy choices: comparing the options O ver the next century and beyond humans

  16. HUMAN RESOURCES SALARY PACKAGING PAYMENT OPTIONS

    E-Print Network [OSTI]

    Tobar, Michael

    HUMAN RESOURCES SALARY PACKAGING PAYMENT OPTIONS This form is for staff employed by The University of Western Australia for salary packaging fitness memberships and renewals offered by UWA Sport member to access salary packaging arrangements. SECTION 1 MEMBERSHIP MEMBERSHIP Start Date (dd

  17. Advanced ignition options for laser ICF

    E-Print Network [OSTI]

    University of Rochester and Princeton Plasma Physics Laboratory #12;FSC With day-one hardware, the NIF can explore high-gain shock ignition - Polar Shock Ignition (uses half the NIF beams to drive the implosion: multi-FM or 2D-SSD (talk by J. Soures at this meeting) The NIF can explore advanced ignition options

  18. Housing & Accommodations On-campus options

    E-Print Network [OSTI]

    Bustamante, Fabin E.

    Housing & Accommodations On-campus options Northwestern University Graduate Housing Engelhart Hall* & Seabury Apartments* Long and short term housing may be available on Northwestern University's campus. See the "Engelhart Hall" and "Seabury Apartments" section of the Graduate Housing web site (http://www.northwestern.edu/gradhousing/housing

  19. Finding the cheapest Clean power options

    SciTech Connect (OSTI)

    Casten, Thomas R.; Smith, Jeffrey A.

    2009-12-15

    Speculation about why policies favor high-cost low-carbon generation options could fill a book. Vested interests? Lack of knowledge? Industry lobbying? Cost-plus regulatory mentality? Regardless of reasons, the data show that efficient generation that uses energy twice is largely ignored. While all other generation, both clean and dirty, receives large subsidies, energy recycling is ignored. (author)

  20. Option of three pseudo--Dirac neutrinos

    E-Print Network [OSTI]

    Wojciech Krolikowski

    1999-10-12

    As an alternative for popular see-saw mechanism, the option of three pseudo% -Dirac neutrinos is discussed, where ${1/2}(m^{(L)} + m^{(R)}) \\ll m^{(D)}$ for their Majorana and Dirac masses. The actual neutrino mass matrix is assumed in the form of tensor product $ M^{(\

  1. A Generic Assessment of Response Options

    E-Print Network [OSTI]

    Delaware, University of

    improvement 236 Cooperation 254 7.4.2 Fossil fuel switching 240 7.4.3 Renewable energy technologies 241, including Energy conservation and efficiency improvement Fossil fuel switching Renewable energy 7.4.6.1 Costs 247 7.1 Introduction 232 7.4.7 Methane 249 7.5 Adaptation Options 2497.2 A Conceptual

  2. Comparison of option prices in semimartingale models

    E-Print Network [OSTI]

    Rschendorf, Ludger

    Comparison of option prices in semimartingale models Jan Bergenthum, Ludger Ruschendorf Department.r.t. martingale pricing measures. The comparison is with respect to convex and also with respect to directionally characteristics of the stochastic logarithm of the stock price processes S, S . As examples we discuss

  3. SWING OPTIONS RENE CARMONA AND MICHAEL LUDKOVSKI

    E-Print Network [OSTI]

    Ludkovski, Mike

    with our discussion, we give a few examples of real-life swing contracts. Swing Option in the Natural Gas Market. Consider an industrial natural gas consumer that wishes to hedge their future input costs amount K of the commodity paying the strike price P. In addition, over the life of the contract

  4. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    SciTech Connect (OSTI)

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  5. Model-Lite Planning: Diverse Multi-Option Plans & Dynamic Objective Functions Daniel Bryce

    E-Print Network [OSTI]

    Kambhampati, Subbarao

    Model-Lite Planning: Diverse Multi-Option Plans & Dynamic Objective Functions Daniel Bryce}@asu.edu Abstract Knowledge acquisition is one major bottle-neck in using planning systems. Model-lite planning reduces this burden by placing responsibility on the planning system to cope with partially specified

  6. Performance improvement options for the supercritical carbon dioxide brayton cycle.

    SciTech Connect (OSTI)

    Moisseytsev, A.; Sienicki, J. J.; Nuclear Engineering Division

    2008-07-17

    The supercritical carbon dioxide (S-CO{sub 2}) Brayton cycle is under development at Argonne National Laboratory as an advanced power conversion technology for Sodium-Cooled Fast Reactors (SFRs) as well as other Generation IV advanced reactors as an alternative to the traditional Rankine steam cycle. For SFRs, the S-CO{sub 2} Brayton cycle eliminates the need to consider sodium-water reactions in the licensing and safety evaluation, reduces the capital cost of the SFR plant, and increases the SFR plant efficiency. Even though the S-CO{sub 2} cycle has been under development for some time and optimal sets of operating parameters have been determined, those earlier development and optimization studies have largely been directed at applications to other systems such as gas-cooled reactors which have higher operating temperatures than SFRs. In addition, little analysis has been carried out to investigate cycle configurations deviating from the selected 'recompression' S-CO{sub 2} cycle configuration. In this work, several possible ways to improve S-CO{sub 2} cycle performance for SFR applications have been identified and analyzed. One set of options incorporates optimization approaches investigated previously, such as variations in the maximum and minimum cycle pressure and minimum cycle temperature, as well as a tradeoff between the component sizes and the cycle performance. In addition, the present investigation also covers options which have received little or no attention in the previous studies. Specific options include a 'multiple-recompression' cycle configuration, intercooling and reheating, as well as liquid-phase CO{sub 2} compression (pumping) either by CO{sub 2} condensation or by a direct transition from the supercritical to the liquid phase. Some of the options considered did not improve the cycle efficiency as could be anticipated beforehand. Those options include: a double recompression cycle, intercooling between the compressor stages, and reheating between the turbine stages. Analyses carried out as part of the current investigation confirm the possibilities of improving the cycle efficiency that have been identified in previous investigations. The options in this group include: increasing the heat exchanger and turbomachinery sizes, raising of the cycle high end pressure (although the improvement potential of this option is very limited), and optimization of the low end temperature and/or pressure to operate as close to the (pseudo) critical point as possible. Analyses carried out for the present investigation show that significant cycle performance improvement can sometimes be realized if the cycle operates below the critical temperature at its low end. Such operation, however, requires the availability of a heat sink with a temperature lower than 30 C for which applicability of this configuration is dependent upon the climate conditions where the plant is constructed (i.e., potential performance improvements are site specific). Overall, it is shown that the S-CO{sub 2} Brayton cycle efficiency can potentially be increased to 45 %, if a low temperature heat sink is available and incorporation of larger components (e.g.., heat exchangers or turbomachinery) having greater component efficiencies does not significantly increase the overall plant cost.

  7. A streamlined real options model for Real Estate Development

    E-Print Network [OSTI]

    Barman, Baabak

    2007-01-01

    This thesis introduces a streamlined model that incorporates the value of the real options that exist in real estate development projects. Real options add value to a project by providing developers with flexibility to ...

  8. Options for Energy Efficiency in India and Barriers to Their...

    Open Energy Info (EERE)

    Options for Energy Efficiency in India and Barriers to Their Adoption: A Scoping Study Jump to: navigation, search Name Options for Energy Efficiency in India and Barriers to Their...

  9. Tool to Compare Solar Energy Program Financing Options

    Broader source: Energy.gov [DOE]

    This model is intended to be used for internal discussion purposes and should be used only as a guideline for evaluating the options. The costs for the three options are automatically updated when changes are made to the Key Assumptions.

  10. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01

    leases often include a buyout option at the end of the leasealso include an early buyout option that is exercisable atof encouraging an early buyout once all of the Tax Benefits

  11. Cyanide treatment options in coke plants

    SciTech Connect (OSTI)

    Minak, H.P.; Lepke, P. [Krupp Uhde GmbH, Dortmund (Germany)

    1997-12-31

    The paper discusses the formation of cyanides in coke oven gas and describes and compares waste processing options. These include desulfurization by aqueous ammonia solution, desulfurization using potash solution, desulfurization in oxide boxes, decomposition of NH{sub 3} and HCN for gas scrubbing. Waste water treatment methods include chemical oxidation, precipitation, ion exchange, reverse osmosis, and biological treatment. It is concluded that biological treatment is the most economical process, safe in operation and requires a minimum of manpower.

  12. MCNP6 Cosmic-Source Option

    SciTech Connect (OSTI)

    McKinney, Gregg W; Armstrong, Hirotatsu; James, Michael R; Clem, John; Goldhagen, Paul

    2012-06-19

    MCNP is a Monte Carlo radiation transport code that has been under development for over half a century. Over the last decade, the development team of a high-energy offshoot of MCNP, called MCNPX, has implemented several physics and algorithm improvements important for modeling galactic cosmic-ray (GCR) interactions with matter. In this presentation, we discuss the latest of these improvements, a new Cosmic-Source option, that has been implemented in MCNP6.

  13. Renewable Energy Requirements for Future Building Codes: Options for Compliance

    SciTech Connect (OSTI)

    Dillon, Heather E.; Antonopoulos, Chrissi A.; Solana, Amy E.; Russo, Bryan J.

    2011-09-30

    As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft{sup 2} of roof area or 0.5 W/ft{sup 2} of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft{sup 2} of r

  14. Industrial Engineering-BS ,PhD option in Engineering

    E-Print Network [OSTI]

    Barge, Marcy

    I Industrial Engineering- BS ,PhD option in Engineering Industrial & Management Engineering - BS MS Applied Mathematics - BS optionin Mathematics Applied Mechanics PhD option in Engineering Applied; teaching "minor, Art History minor Art.History - BA option in Art; minor B Bio-resources`Engineering - BS

  15. Perpetual American Options in Incomplete Markets: The Infinitely Divisible Case

    E-Print Network [OSTI]

    most commonly have a ten year maturity, whilst canonical problems in real options are solvedPerpetual American Options in Incomplete Markets: The Infinitely Divisible Case Vicky Henderson of a number of American options in an incomplete market. In this paper we are interested in the case where

  16. Wireless Network Capacity Management: A Real Options Approach

    E-Print Network [OSTI]

    Forsyth, Peter A.

    Wireless Network Capacity Management: A Real Options Approach Y. d'Halluin , P.A. Forsyth , and K factor algorithm is developed, based on a real options formulation. Numerical examples are provided to illustrate various aspects of the model. Keywords: real options, optimal network planning decisions, network

  17. The Options Approach to Software Prototyping Decisions 1

    E-Print Network [OSTI]

    . The field of real option theory in finance provides a rigorous framework to analyze the optimal exercise; Keywords: Software engineering, economics, prototyping, real options, sequential invest ing, financialThe Options Approach to Software Prototyping Decisions 1 Prasad Chalasani Somesh Jha Kevin Sullivan

  18. The Information in Option Volume for Future Stock Prices

    E-Print Network [OSTI]

    Gabrieli, John

    that option trading volume contains information about future stock prices. Taking advantage of a unique dataThe Information in Option Volume for Future Stock Prices Jun Pan MIT Sloan School of Management set, we construct put-call ratios from option volume initiated by buyers to open new positions. Stocks

  19. OPTIONS FOR ABATING GREENHOUSE GASES FROM EXHAUST STREAMS.

    SciTech Connect (OSTI)

    FTHENAKIS,V.

    2001-12-01

    This report examines different alternatives for replacing, treating, and recycling greenhouse gases. It is concluded that treatment (abatement) is the only viable short-term option. Three options for abatement that were tested for use in semiconductor facilities are reviewed, and their performance and costs compared. This study shows that effective abatement options are available to the photovoltaic (PV) industry, at reasonable cost.

  20. Unified Inter and Intra Options Learning Using Policy Gradient Methods

    E-Print Network [OSTI]

    Shimkin, Nahum

    propose a modular pa- rameterization of intra-option policies together with option termination conditions details on the experimental results in Section 6. #12;terminates if it arrives at a subgoal state and do not change during the inter- option learning phase. Sutton et al. [4] suggest a partial solution

  1. Nuclear Fuel Cycle Options Evaluation to Inform R&D Planning

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; H. Ludewig; W. Halsey; J. Gehin; R. Jubin; J. Buelt; S. Stockinger; K. Jenni; B. Oakley

    2014-04-01

    An Evaluation and Screening (E&S) of nuclear fuel cycle options has been conducted in fulfilment of a Charter specified for the study by the U.S. Department of Energy (DOE) Office of Nuclear Energy. The E&S study used an objective and independently reviewed evaluation process to provide information about the potential benefits and challenges that could strengthen the basis and provide guidance for the research and development(R&D) activities undertaken by the DOE Fuel Cycle Technologies Program Office. Using the nine evaluation criteria specified in the Charter and associated evaluation metrics and processes developed during the E&S study, a screening was conducted of 40 nuclear fuel cycle evaluation groups to provide answers to the questions: (1) Which nuclear fuel cycle system options have the potential for substantial beneficial improvements in nuclear fuel cycle performance, and what aspects of the options make these improvements possible? (2)Which nuclear material management approaches can favorably impact the performance of fuel cycle options? (3)Where would R&D investment be needed to support the set of promising fuel cycle system options and nuclear material management approaches identified above, and what are the technical objectives of associated technologies?

  2. THE ECONOMIC THRESHOLD WITH A STOCHASTIC PEST POPULATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Saphores, Jean-Daniel M

    2007-01-01

    101. Trigeorgis, L. , Real Options: Managerial FlexibilityPEST POPULATION: A REAL OPTIONS APPROACH ? Jean-Daniel M.Keywords: Uncertainty; Real Options; Pest Control; Reentry

  3. Sequestration Options for the West Coast States

    SciTech Connect (OSTI)

    Myer, Larry

    2006-04-30

    The West Coast Regional Carbon Sequestration Partnership (WESTCARB) is one of seven partnerships that have been established by the U.S. Department of Energy (DOE) to evaluate carbon capture and sequestration (CCS) technologies best suited for different regions of the country. The West Coast Region comprises Arizona, California, Nevada, Oregon, Washington, Alaska, and British Columbia. Led by the California Energy Commission, WESTCARB is a consortium of about 70 organizations, including state natural resource and environmental protection agencies; national laboratories and universities; private companies working on carbon dioxide (CO{sub 2}) capture, transportation, and storage technologies; utilities; oil and gas companies; nonprofit organizations; and policy/governance coordinating organizations. Both terrestrial and geologic sequestration options were evaluated in the Region during the 18-month Phase I project. A centralized Geographic Information System (GIS) database of stationary source, geologic and terrestrial sink data was developed. The GIS layer of source locations was attributed with CO{sub 2} emissions and other data and a spreadsheet was developed to estimate capture costs for the sources in the region. Phase I characterization of regional geological sinks shows that geologic storage opportunities exist in the WESTCARB region in each of the major technology areas: saline formations, oil and gas reservoirs, and coal beds. California offers outstanding sequestration opportunities because of its large capacity and the potential of value-added benefits from enhanced oil recovery (EOR) and enhanced gas recovery. The estimate for storage capacity of saline formations in the ten largest basins in California ranges from about 150 to about 500 Gt of CO{sub 2}, the potential CO{sub 2}-EOR storage was estimated to be 3.4 Gt, and the cumulative production from gas reservoirs suggests a CO{sub 2} storage capacity of 1.7 Gt. A GIS-based method for source-sink matching was implemented and preliminary marginal cost curves developed, which showed that 20, 40, or 80 Mega tonnes (Mt) of CO{sub 2} per year could be sequestered in California at a cost of $31/tonne (t), $35/t, or $50/t, respectively. Phase I also addressed key issues affecting deployment of CCS technologies, including storage-site monitoring, injection regulations, and health and environmental risks. A framework for screening and ranking candidate sites for geologic CO{sub 2} storage on the basis of HSE risk was developed. A webbased, state-by-state compilation of current regulations for injection wells, and permits/contracts for land use changes, was developed, and modeling studies were carried out to assess the application of a number of different geophysical techniques for monitoring geologic sequestration. Public outreach activities resulted in heightened awareness of sequestration among state, community and industry leaders in the Region. Assessment of the changes in carbon stocks in agricultural lands showed that Washington, Oregon and Arizona were CO{sub 2} sources for the period from 1987 to 1997. Over the same period, forest carbon stocks decreased in Washington, but increased in Oregon and Arizona. Results of the terrestrial supply curve analyses showed that afforestation of rangelands and crop lands offer major sequestration opportunities; at a price of $20 per t CO{sub 2}, more than 1,233 MMT could be sequestered over 40-years in Washington and more than 1,813 MMT could be sequestered in Oregon.

  4. Effect of antioxidants, color and sensory atributes of different sorghum brans in model baking systems

    E-Print Network [OSTI]

    Guajardo Flores, David

    2009-05-15

    Attributes of Inclusion of Different Sorghum Brans in Model Baking Systems. (December 2007) David Guajardo Flores, B.S., Instituto Tecnologico y de Estudios Superiores de Monterrey Chair of Advisory Committee: Dr. Lloyd W. Rooney The effects... there when I needed them. I thank all my friends that I met during this process: Alejandro Perez, Emilio Villarreal, Marc Barron, Angelina de Castro, Vilma Calderon and her husband Pedro, Novie Alviola, Armando del Follo, Yolanda Nuez and especially...

  5. Optional Residential Program Benchmarking | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary Areas of the countryof EnergyOptional Residential Program

  6. Fuel Cell Financing Options | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool Fits the Bill Financing Tool Fits theSunShot Prize: Race toFt.Financing Options Fuel

  7. Food Options | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES OctoberEvanServices »FirstCurrent Science Create aFood Options

  8. Climate Finance Options Platform | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal Technologies Place:StandardsFinance Options Platform Jump

  9. Climate Financing Options | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal Technologies Place:StandardsFinance Options Platform

  10. New Energy Options | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavyAgency (IRENA)Options Jump to: navigation, search Name: New

  11. Payment Options - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access| Department ofStephenSkinner,PastPatent80PaulPavingPayment Options

  12. Energy Options Solutions | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdisto Electric Coop, Incsource History View New PagesMonte CarloOptions

  13. Assuring Generation Adequacy through Call Option Obligations Shmuel S. Oren, Fellow IEEE

    E-Print Network [OSTI]

    Oren, Shmuel S.

    operators and competitive markets for retail service, including open access to transmission for independent technological barriers to demand response, local market power, and price caps due to political aversion to price service options. The means included regional wholesale markets managed by regulated transmission system

  14. Real options : a way to deal with market uncertainty in real estate development projects

    E-Print Network [OSTI]

    Kim, Kyungwon

    2008-01-01

    The practice of applying options theory to real estate investments has only recently begun. In particular, options in real estate are called "real options." Real options add value to real estate development projects by ...

  15. Cementitious waste option scoping study report

    SciTech Connect (OSTI)

    Lee, A.E.; Taylor, D.D.

    1998-02-01

    A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

  16. Greenhouse gas mitigation options for Washington State

    SciTech Connect (OSTI)

    Garcia, N.

    1996-04-01

    President Clinton, in 1993, established a goal for the United States to return emissions of greenhouse gases to 1990 levels by the year 2000. One effort established to help meet this goal was a three part Environmental Protection Agency state grant program. Washington State completed part one of this program with the release of the 1990 greenhouse gas emissions inventory and 2010 projected inventory. This document completes part two by detailing alternative greenhouse gas mitigation options. In part three of the program EPA, working in partnership with the States, may help fund innovative greenhouse gas reduction strategies. The greenhouse gas control options analyzed in this report have a wide range of greenhouse gas reductions, costs, and implementation requirements. In order to select and implement a prudent mix of control strategies, policy makers need to have some notion of the potential change in climate, the consequences of that change and the uncertainties contained therein. By understanding the risks of climate change, policy makers can better balance the use of scarce public resources for concerns that are immediate and present against those that affect future generations. Therefore, prior to analyzing alternative greenhouse gas control measures, this report briefly describes the phenomenon and uncertainties of global climate change, and then projects the likely consequences for Washington state.

  17. Options for Control of Reactive Power by Distributed Photovoltaic Generators

    E-Print Network [OSTI]

    Sulc, Petr; Backhaus, Scott; Chertkov, Michael

    2010-01-01

    High penetration levels of distributed photovoltaic(PV) generation on an electrical distribution circuit present several challenges and opportunities for distribution utilities. Rapidly varying irradiance conditions may cause voltage sags and swells that cannot be compensated by slowly responding utility equipment resulting in a degradation of power quality. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We discuss and compare via simulation various design options for control systems to manage the reactive power generated by these inverters. An important design de...

  18. Market-Based Indian Grid Integration Study Options: Preprint

    SciTech Connect (OSTI)

    Stoltenberg, B.; Clark, K.; Negi, S. K.

    2012-03-01

    The Indian state of Gujarat is forecasting solar and wind generation expansion from 16% to 32% of installed generation capacity by 2015. Some states in India are already experiencing heavy wind power curtailment. Understanding how to integrate variable generation (VG) into the grid is of great interest to local transmission companies and India's Ministry of New and Renewable Energy. This paper describes the nature of a market-based integration study and how this approach, while new to Indian grid operation and planning, is necessary to understand how to operate and expand the grid to best accommodate the expansion of VG. Second, it discusses options in defining a study's scope, such as data granularity, generation modeling, and geographic scope. The paper also explores how Gujarat's method of grid operation and current system reliability will affect how an integration study can be performed.

  19. Enrichment Zoning Options for the Small Nuclear Rocket Engine (SNRE)

    SciTech Connect (OSTI)

    Bruce G. Schnitzler; Stanley K. Borowski

    2010-07-01

    Advancement of U.S. scientific, security, and economic interests through a robust space exploration program requires high performance propulsion systems to support a variety of robotic and crewed missions beyond low Earth orbit. In NASAs recent Mars Design Reference Architecture (DRA) 5.0 study (NASA-SP-2009-566, July 2009), nuclear thermal propulsion (NTP) was again selected over chemical propulsion as the preferred in-space transportation system option because of its high thrust and high specific impulse (-900 s) capability, increased tolerance to payload mass growth and architecture changes, and lower total initial mass in low Earth orbit. An extensive nuclear thermal rocket technology development effort was conducted from 1955-1973 under the Rover/NERVA Program. The Small Nuclear Rocket Engine (SNRE) was the last engine design studied by the Los Alamos National Laboratory during the program. At the time, this engine was a state-of-the-art design incorporating lessons learned from the very successful technology development program. Past activities at the NASA Glenn Research Center have included development of highly detailed MCNP Monte Carlo transport models of the SNRE and other small engine designs. Preliminary core configurations typically employ fuel elements with fixed fuel composition and fissile material enrichment. Uniform fuel loadings result in undesirable radial power and temperature profiles in the engines. Engine performance can be improved by some combination of propellant flow control at the fuel element level and by varying the fuel composition. Enrichment zoning at the fuel element level with lower enrichments in the higher power elements at the core center and on the core periphery is particularly effective. Power flattening by enrichment zoning typically results in more uniform propellant exit temperatures and improved engine performance. For the SNRE, element enrichment zoning provided very flat radial power profiles with 551 of the 564 fuel elements within 1% of the average element power. Results for this and alternate enrichment zoning options for the SNRE are compared.

  20. Procurement Options for New Renewable Electricity Supply

    SciTech Connect (OSTI)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  1. In-car Airway Options for NASCAR Drivers

    E-Print Network [OSTI]

    Dyreyes, Jonathan Q; Grange, Jeff; Smith, Dustin; Jin, Peter; Guldner, Greg

    2008-01-01

    Medicine Background: Stock car drivers may require anpresentation pregnancy. In-car Airway Options for NASCARhelmeted, and apneic stock car driver simulation model.

  2. TV Energy Consumption Trends and Energy-Efficiency Improvement Options

    E-Print Network [OSTI]

    Park, Won Young

    2011-01-01

    television sets. Austrian Energy Agency, June. Chen, H.F.of Options for Improving Energy Efficiency Test Proceduresfor Displays, March. Energy Conservation Center, Japan (

  3. DOE Exercises 5 Year Option on Washington TRU Solutions Contract...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    it has decided to exercise the five year option in the Washington TRU Solutions LLC ("WTS") contract to continue managing and operating the Department's Waste Isolation Pilot...

  4. Assessment of Future Vehicle Transportation Options and their...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future Vehicle Transportation Options and Their Impact on the Electric Grid January 10, 2010 New Analysis of Alternative Transportation Technologies 3 What's New? * Additional...

  5. Sandia Energy - Study Compares Floating-Platform Options for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Study Compares Floating-Platform Options for Offshore Vertical-Axis Wind Turbines Home Renewable Energy Energy Partnership News Wind Energy News & Events Study Compares...

  6. ID BUC$ EQUIPMENT REQUEST FORM CAMPUS EVENT PAYMENT OPTION

    E-Print Network [OSTI]

    Karsai, Istvan

    ID BUC$ EQUIPMENT REQUEST FORM CAMPUS EVENT PAYMENT OPTION FOR ETSU ORGANIZATIONS Name ID BUC$. ETSU account transfer or a check requested? o ETSU Account

  7. Decoupling Policies: Options to Encourage Energy Efficiency Policies...

    Office of Environmental Management (EM)

    Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL)...

  8. How to implement renewable energy and energy efficiency options...

    Open Energy Info (EERE)

    How to implement renewable energy and energy efficiency options Support for South African local government Jump to: navigation, search Tool Summary LAUNCH TOOL Name: How to...

  9. Feebates: A Legislative Option to Encourage Continuous Improvements...

    Open Energy Info (EERE)

    Feebates: A Legislative Option to Encourage Continuous Improvements to Automobile Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Feebates: A Legislative...

  10. Briggs & Stratton: Putting All Energy Efficiency Options on the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Briggs & Stratton: Putting All Energy Efficiency Options on the Table Briggs & Stratton manufactures internal combustion engines, as well as yard and home power products for...

  11. NCSL - State Policy Options: A Report of the National Conference...

    Open Energy Info (EERE)

    NCSL - State Policy Options: A Report of the National Conference of State Legislatures Task Force on military and Veterans Affairs Jump to: navigation, search OpenEI Reference...

  12. Using Backup Generators: Alternative Backup Power Options | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to electric generators powered by fuel, homeowners and business owners may consider alternative backup power options. Battery-stored backup power-Allows you to continue...

  13. Directory of Standard, Optional and Other Agency Forms

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1989-12-12

    The directive lists the Directory of Standard, Optional and Other Agency Forms and includes a list of Departmental reports and forms managers. Cancels DOE 1322.4A.

  14. POWDERED ACTIVATED CARBON FROM NORTH DAKOTA LIGNITE: AN OPTION...

    Office of Scientific and Technical Information (OSTI)

    CARBON FROM NORTH DAKOTA LIGNITE: AN OPTION FOR DISINFECTION BY-PRODUCT CONTROL IN WATER TREATMENT PLANTS Citation Details In-Document Search Title: POWDERED ACTIVATED...

  15. Mathematical investigation of one-way transform matrix options.

    SciTech Connect (OSTI)

    Cooper, James Arlin

    2006-01-01

    One-way transforms have been used in weapon systems processors since the mid- to late-1970s in order to help recognize insertion of correct pre-arm information while maintaining abnormal-environment safety. Level-One, Level-Two, and Level-Three transforms have been designed. The Level-One and Level-Two transforms have been implemented in weapon systems, and both of these transforms are equivalent to matrix multiplication applied to the inserted information. The Level-Two transform, utilizing a 6 x 6 matrix, provided the basis for the ''System 2'' interface definition for Unique-Signal digital communication between aircraft and attached weapons. The investigation described in this report was carried out to find out if there were other size matrices that would be equivalent to the 6 x 6 Level-Two matrix. One reason for the investigation was to find out whether or not other dimensions were possible, and if so, to derive implementation options. Another important reason was to more fully explore the potential for inadvertent inversion. The results were that additional implementation methods were discovered, but no inversion weaknesses were revealed.

  16. SBAC-PAD'2000 12th Symposium on Computer Architecture and High Performance Computing -S~ao Pedro -SP 83

    E-Print Network [OSTI]

    Cruz, Frederico

    in many con- texts such as telecommunication, transportation, or electric power sys- tems. A new model instruction stream, mul- tiple data stream) parallel computation systems. Thus, the implemen- tations are very problems I. INTRODUCTION A. Motivation and Problem Statement In order to guarantee quality of service (Qo

  17. Hybrid Modeling of Communication Networks Using Modelica Daniel Farnqvist, Katrin Strandemar, Karl Henrik Johansson, and Jo~ao Pedro Hespanha

    E-Print Network [OSTI]

    Hespanha, Joo Pedro

    Hybrid Modeling of Communication Networks Using Modelica Daniel Farnqvist, Katrin Strandemar networks using Modelica is discussed. Congestion control in packet-switched networks, such as the Internet, by develop- ing a model library based on a recent hybrid systems model, that Modelica provides an efficient

  18. Constraint solving for direct manipulation of features DANIEL LOURENO,1 PEDRO OLIVEIRA,1 ALEX NOORT,2 and RAFAEL BIDARRA2

    E-Print Network [OSTI]

    Bidarra, Rafael

    of current constraint solvers. In this paper, an approach to the optimization of geometric constraint solving, in a feature modeling system the designer builds a model out of features, each of which has a well and orient it, or constraints that express the physical limits of the drilling machinery avail- able

  19. Developing Business Case for Electrical System Replacement

    E-Print Network [OSTI]

    Miller, Carles

    2006-05-19

    to estimate proposed options, and how to use reliability analysis as an essential tool for developing economic justification and ranking the proposed options for electrical upgrade projects. The concepts of reliable electrical systems, and the use of IEEE Std...

  20. Berkeley Program Offers New Option for Financing Residential PV Systems

    E-Print Network [OSTI]

    Bolinger, Mark A

    2009-01-01

    Clean Energy States Alliance, titled Property Tax Assessments as a Finance Vehicle for Residential PV Installations: Opportunities and Potential

  1. Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design

    E-Print Network [OSTI]

    Ogden, J; Yang, Christopher

    2005-01-01

    to International Journal of Hydrogen Energy (November 2005).0528 Implementing a Hydrogen Energy Infrastructure: StorageImplementing a Hydrogen Energy Infrastructure: Storage

  2. Local Option- Property Tax Exemption for Renewable Energy Systems

    Broader source: Energy.gov [DOE]

    Colorado enacted S.B. 07-145 in April 2007, authorizing counties and municipalities to offer property or sales tax rebates or credits to residential and commercial property owners who install...

  3. Local Option- Property Tax Exemption for Renewable Energy Systems

    Office of Energy Efficiency and Renewable Energy (EERE)

    Beginning in October 2013, a municipality may also adopt an ordinance to exempt commercial or industrial Class I renewable resources*, certain hydropower facilities**, or solar thermal or geother...

  4. Automated Surface Observing System: Standby Power Options | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels Research atDepartmentAudits and6AuidtWorkplace

  5. Local Option - Property Tax Exemption for Renewable Energy Systems |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOE Safety StandardsLaborLignol< BackDepartment of Energy

  6. Empowering Variable Renewables: Options for Flexible Electricity Systems |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdisto Electric Coop, Inc JumpElko, Nevada:Geothermal Power LLC Jump

  7. Local Option - Solar, Wind & Biomass Energy Systems Exemption | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIALU.S.Leadership on CleanUpList of EEREGovernmentEnergyof

  8. Valuation and Optimal Exercise Strategy of Electricity Swing Options.

    E-Print Network [OSTI]

    Dalang, Robert C.

    Valuation and Optimal Exercise Strategy of Electricity Swing Options. Gido Haarbrcker, Daniel Kuhn plateforme de recherche Alexandria https://www.alexandria.unisg.ch | 04.02.2014 Electricity swing options https://www.alexandria.unisg.ch | 04.02.2014 mot-cl energy, derivative pricing, electricity swing

  9. SHORT-TERM GENERATION ASSET VALUATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Tseng, Chung-Li

    using real options to value power plants with unit commitment constraints over a short-term period. We, that a certain lead time for commitment and decommitment decisions is necessary to start up and shut down a unit tackled this power plant valuation problem using financial options theory has overlooked the plant's unit-commitment

  10. UCF Computer Science MS Program of Study (POS) Thesis Option

    E-Print Network [OSTI]

    Stanley, Kenneth O.

    UCF Computer Science MS Program of Study (POS) Thesis Option Required Core Courses (6 Credit Hours Course Work Subtotal: Subtotal: Thesis Requirement (6 Credit Hours Required) Course Semester / Year (POS) Thesis Option Catalog Year 2012-2013 2 Thesis Committee Position Co-Chair? Typed Name Chair

  11. Worksheet for the MA in Statistics Thesis Option

    E-Print Network [OSTI]

    McAuliffe, Jon

    Worksheet for the MA in Statistics Thesis Option Name: (Last, first, middle) SID #: E-mail: Local Courses When taking the thesis option, a total of 20 units is need to complete the degree, of which: _____________________________________________________________________________________________ Department Course # Course Title Units Semester Grade Thesis Proposed Thesis Title

  12. Energy Options for the Future* John Sheffield,1

    E-Print Network [OSTI]

    Energy Options for the Future* John Sheffield,1 Stephen Obenschain,2,12 David Conover,3 Rita Bajura at the Energy Options for the Future meeting held at the Naval Research Laboratory in March of 2004, geo- thermal, and biomass energy sources and the effect of measures for energy conservation

  13. Record Storage Options Created: 11/20/2013

    E-Print Network [OSTI]

    Alpay, S. Pamir

    Record Storage Options Created: 11/20/2013 Revised: 2/17/2014 Storage Option Location and Costs for storage (+) Does not require that records are extensively organized (+/-) Does not track destruction periods like personnel records (-) State Storage Center Rocky Hill, Connecticut Cost upfront

  14. Pricing European Barrier Options Peter W.Buchen

    E-Print Network [OSTI]

    Sydney, University of

    barrier options which incorporate a con- stant rebate. The method exploits the symmetries and properties of elemen- tary solutions of the Black-Scholes partial differential equation. The rebate and non-rebate. If rebates apply then the first exit time densities through the barrier are also required. Barrier option

  15. Pickering -Slowing the flow Flood Storage Option July 2011

    E-Print Network [OSTI]

    to build upstream flood storage to reduce the risk of flooding to residents in Pickering has been putPickering - Slowing the flow Flood Storage Option July 2011 Update As you know, our proposal in relation to the flood storage option. These are as follows:- We will reassess the current design proposal

  16. User-Friendly Methodology for Automatic Exploration of Compiler Options

    E-Print Network [OSTI]

    Gao, Guang R.

    User-Friendly Methodology for Automatic Exploration of Compiler Options: A Case Study on the Intel, lochen, jcuvillo, ggao}@capsl.udel.edu Abstract Finding an optimized combination of compiler options with a deep understanding of the application at hand and a fairly good knowledge of the compiler features

  17. Implied and Local Correlations from Spread Options Rene Carmona

    E-Print Network [OSTI]

    Carmona, Rene

    cor- relation skew examplifies how inaccurate the constant correlation assumption in the multivariate a set of special parameters, and we propose a calibration procedure using option prices on individual. For example, the spark spread option is a spread between natural gas and electric power. The underlying is St

  18. Finance 2nd Option Worksheet 2010 -2012 Name: Date: UNOFFICIAL

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Finance 2nd Option Worksheet 2010 - 2012 Name: Date: UNOFFICIAL Fall Credits Spring Credits ECNS 3 Spring only BFIN 456 Entrp Finance 3 Fall/Spring BFIN 452 Int'l Finance 3 Spring only BFIN 466/2012 Senior-Level Option Courses Finance Restricted Electives (9 crds required) Form can be found online

  19. Finance 2nd Option Worksheet 2012 -2014 Name: Date: UNOFFICIAL

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Finance 2nd Option Worksheet 2012 - 2014 Name: Date: UNOFFICIAL Fall Credits Spring Credits ECNS 3 Spring only BFIN 456 Entrp Finance 3 Fall/Spring BFIN 452 Int'l Finance 3 Spring only BFIN 466/2012 Senior-Level Option Courses Finance Restricted Electives (9 crds required) Form can be found online

  20. DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS

    E-Print Network [OSTI]

    Bertini, Robert L.

    DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri-based fee collection centers, including the identification of issues related to data transmission, data entitled Institutional Options for VMT Data and Fee Collection Centers has examined issues related

  1. Application to the Early Entry PhD Option Instructions

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Application to the Early Entry PhD Option Instructions: 1. TYPE required information. (You to the Academic Programs Office: Attention: Carol Aspinwall, Coordinator of PhD Program Academic Student Services that describes your reasons for seeking admission to the Early Entry PhD Option. APPROVAL (For office use only

  2. American Options under Proportional Transaction Costs: Seller's Price Algorithm,

    E-Print Network [OSTI]

    Zastawniak, Tomasz

    American Options under Proportional Transaction Costs: Seller's Price Algorithm, Hedging Strategy and hedged in a general discrete market in the presence of arbitrary proportional transaction costs inherent's position in American options when trading in the underlying asset is subject to proportional transaction

  3. Physical Therapy Career Options Human Biology Health & Society (HBHS)

    E-Print Network [OSTI]

    Chen, Tsuhan

    65 Physical Therapy Career Options Human Biology Health & Society (HBHS) Nutritional Sciences CHE-CALS) ________________________________________________________________________________________ Many NS-CHE, NS-CALS and HBHS majors consider physical therapy as a career option because, performance and rehabilitation. The pathway to a career in physical therapy for Cornell undergraduates

  4. THE COSTS AND BENEFITS OF A PUBLIC OPTION IN

    E-Print Network [OSTI]

    Kammen, Daniel M.

    THE COSTS AND BENEFITS OF A PUBLIC OPTION IN HEALTH CARE REFORM: An Economic Analysis Ethan Kaplan on Health, Economic & Family Security #12;i Berkeley Center on Health, Economic & Family Security|The Costs Security|The Costs and Benefits of a Public Option in Health Care Reform: An Economic Analysis EXECUTIVE

  5. 1 | P a g e Calendar Weather Options

    E-Print Network [OSTI]

    Calgary, University of

    1 | P a g e July 2013 Calendar Weather Options Outlook 2013 Outlook 2013 uses a plug-in which provides weather data in the Calendar. The following instructions enable you to modify the weather settings for your calendar. Turn Weather On/Off 1. Click or touch File 2. Click or touch Options 3. Select Calendar

  6. New Health Insurance Marketplace Coverage Options and Your Health Coverage

    E-Print Network [OSTI]

    Sun, Yi

    New Health Insurance Marketplace Coverage Options and Your Health Coverage PART A: General Information When key parts of the health care law take effect in 2014, there will be a new way to buy health insurance: the Health Insurance Marketplace. To assist you as you evaluate options for you and your family

  7. Solar Leasing for Residential Photovoltaic Systems (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-02-01

    This publication examines the solar lease option for residential PV systems and describes two solar lease programs already in place.

  8. HVAC Equipment Design Options for Near-Zero-Energy Homes (NZEH) -A Stage 2 Scoping Assessment

    SciTech Connect (OSTI)

    Baxter, Van D

    2005-11-01

    Although the energy efficiency of heating, ventilating, and air-conditioning (HVAC) equipment has increased substantially in recent years, new approaches are needed to continue this trend. Conventional unitary equipment and system designs have matured to a point where cost-effective, dramatic efficiency improvements that meet near-zero-energy housing (NZEH) goals require a radical rethinking of opportunities to improve system performance. The large reductions in HVAC energy consumption necessary to support the NZEH goals require a systems-oriented analysis approach that characterizes each element of energy consumption, identifies alternatives, and determines the most cost-effective combination of options. In particular, HVAC equipment must be developed that addresses the range of special needs of NZEH applications in the areas of reduced HVAC and water heating energy use, humidity control, ventilation, uniform comfort, and ease of zoning. This report describes results of a scoping assessment of HVAC system options for NZEH homes. ORNL has completed a preliminary adaptation, for consideration by The U.S. Department of Energy, Energy Efficiency and Renewable Energy Office, Building Technologies (BT) Program, of Cooper's (2001) stage and gate planning process to the HVAC and Water Heating element of BT's multi-year plan, as illustrated in Figure 1. In order to adapt to R&D the Cooper process, which is focused on product development, and to keep the technology development process consistent with an appropriate role for the federal government, the number and content of the stages and gates needed to be modified. The potential federal role in technology development involves 6 stages and 7 gates, but depending on the nature and status of the concept, some or all of the responsibilities can flow to the private sector for product development beginning as early as Gate 3. In the proposed new technology development stage and gate sequence, the Stage 2 'Scoping Assessment' provides the deliverable leading into the Gate 3 'Scoping Assessment Screen'. This report is an example of a Stage 2 deliverable written to document the screening of options against the Gate 3 criteria and to support DOE decision making and option prioritization. The objective of this scoping assessment was to perform a transparent evaluation of the HVAC system options for NZEH based on the applying the Gate 3 criteria uniformly to all options.

  9. Evaluation of passive solar retrofit options

    SciTech Connect (OSTI)

    Ben-David, S.; Kirchemen, C.; Martin, S.; Noll, S.; Roach, F.

    1980-01-01

    An evaluation framework has been developed which allows for the assessment of the role of passive solar retrofit in the nationwide reduction of conventional fuel use. Three types of analysis are proposed within this framework: the physical/technical capability of the present housing stock to incorporate passive solar retrofit; the economic feasibility of the application of retrofit designs; and the actual market potential or acceptance of these alternative retrofit options. Each type of analysis has specific data requirements and a series of evaluation procedures to help establish estimates of the potential for passive solar retrofit in the present housing stock. The data requirements with their respective sources and evaluation procedures for the first two types of analysis-physical/technical setting and economic feasibility, are examined. A distinction is drawn between community specific case studies and more generalized national assessments. Information derived from these three types of analysis, whether case specific or national in scope, can then be used in an evaluation of potential economic impacts. The establishment of regional economic benefits and costs werve as a measure of the merit or attractiveness of the implementation of a passive solar retrofit program.

  10. EBIS, an option for medical synchrotrons

    SciTech Connect (OSTI)

    Prelec, K.

    1993-12-31

    Light ion beams have been used for cancer therapy for about twenty years; several dedicated facilities are presently either planned or under construction. In addition, several synchrotrons designed for other purposes are now considered for medical applications as well. A medical synchrotron needs a preaccelerator to produce and inject a range of different light ions, preferably fully stripped, into the ring. The size, cost and complexity of the preaccelerator depend on the performance of its first element, the ion source, and these features will be optimized if the source itself produces fully stripped ions. An EBIS (Electron Beam Ion Source) is capable of producing fully stripped light ions up to argon with intensities sufficient for medical applications. As it has been pointed out in the past, this source option may require just one stage of preacceleration, an RFQ linac, thus making it very simple and compact. The AGS Department has a separate project already under way to develop a very high intensity EBIS for our nuclear physics program. It is, however, our plan first to construct and test an intermediate size device and then to proceed to the design of the final, full scale device. Parameters of that intermediate model are close to those that would be needed for a medical synchrotron. This paper describes the BNL program and considers parameters of EBIS devices for possible use in synchrotron facilities serving as sources of high energy light ions for cancer therapy.

  11. Options for Control of Reactive Power by Distributed Photovoltaic Generators

    E-Print Network [OSTI]

    Petr Sulc; Konstantin Turitsyn; Scott Backhaus; Michael Chertkov

    2010-08-04

    High penetration levels of distributed photovoltaic(PV) generation on an electrical distribution circuit present several challenges and opportunities for distribution utilities. Rapidly varying irradiance conditions may cause voltage sags and swells that cannot be compensated by slowly responding utility equipment resulting in a degradation of power quality. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We discuss and compare via simulation various design options for control systems to manage the reactive power generated by these inverters. An important design decision that weighs on the speed and quality of communication required is whether the control should be centralized or distributed (i.e. local). In general, we find that local control schemes are capable for maintaining voltage within acceptable bounds. We consider the benefits of choosing different local variables on which to control and how the control system can be continuously tuned between robust voltage control, suitable for daytime operation when circuit conditions can change rapidly, and loss minimization better suited for nighttime operation.

  12. Catalog of DC Appliances and Power Systems

    E-Print Network [OSTI]

    Garbesi, Karina

    2012-01-01

    but also include electricity storage. Storage will bea net-metered PV system, electricity storage and an optionalTypical Operation: Electricity storage systems for grid-

  13. Westinghouse Owners Group Risk-Informed Regulation Efforts: Options 2 and 3

    SciTech Connect (OSTI)

    Brown, Jason A.; Osterrieder, Robert A.; Lutz, Robert J. [Westinghouse Electric Company LLC (United States); Dingler, Maurice [Wolf Creek Nuclear Operating Company, Burlington, KS (United States); Ward, Lewis A. [Southern Nuclear Company (United States)

    2002-07-01

    The U.S. Nuclear Regulatory Commission (NRC) has initiated efforts to incorporate risk-informed methods to redefine the scope of the existing 10 CFR 50 regulations (Option 2) and to change the technical requirements of the regulations (Option 3). The overall objectives of these efforts are to enhance plant safety, provide a framework for risk-informed regulations, add flexibility to plant operations, and reduce regulatory burden. The Westinghouse Owners Group (WOG) has a variety of active programs in the risk-informed area, including a program in the Option 2 and Option 3 areas. These two programs will be summarized including the benefits and the technical approach. The purpose of Option 2 is to make changes to the overall scope of structures, systems and components (SSCs) covered by 10 CFR 50 requiring special treatment by formulating new risk-informed safety classification categories that are linked to current definitions of safety-related and important-to-safety. This initiative would permit possible changes to the current special treatment requirements based on risk insights. The Nuclear Energy Institute (NEI) has developed an Option 2 implementation guideline (NEI 00-04 Draft Revision B). The WOG has initiated a program to validate the NEI guideline and to provide an initial cost-benefit assessment of the revised categorization and treatment under Option 2 via trial application to two systems at both Surry Unit 1 and Wolf Creek. The WOG Option 2 program includes consideration of all of the components in the selected systems, regardless of whether or not they are modeled in the respective plant probabilistic risk assessment (PRA) studies. As a result, quantitative risk measures are not available for many of the components being considered. In this case, the WOG program will provide valuable input to the NEI guideline. Additionally, the WOG program extends the use of both of the dominant methodologies for risk-informed ISI (RI-ISI) to address repair and replacement activities of pressure-retaining items per Code Cases under development within ASME. Therefore, feedback is provided on the consideration of passive components for extending both the WOG and Electric Power Research Institute (EPRI) RI-ISI methodologies for piping to all pressure-retaining items. In the Option 3 area, the WOG Large Break Loss-of-Coolant Accident (LBLOCA) Redefinition program is a risk-informed approach to improve select regulations (10 CFR 50.46, Appendix A, and Appendix K) such that the plant licensing basis is focused on LOCA break sizes up to a new maximum size. The new maximum break size will replace the existing requirement to consider break sizes up to and including double ended breaks of the largest primary system piping. Plants will retain the capability to mitigate a break of the largest primary system piping as evaluated using realistic success criteria and assumptions. The WOG is also providing input to the development of a risk-informed 10 CFR 50.44 based on insights from the WOG Severe Accident Management Guidance and plant-specific PRA studies. (authors)

  14. Solar Energy Option Requirement for Residential Developments

    Broader source: Energy.gov [DOE]

    Solar energy systems are defined to include systems that use solar energy to provide "all or a portion of the heating, cooling, or general energy needs of a dwelling unit, including, but not lim...

  15. Cogeneration: An Industrial Steam and Power Option

    E-Print Network [OSTI]

    Orlando, J. A.; Stewart, M. M.; Roberts, J. R.

    1993-01-01

    , these internal use systems use the cogenerated power on-site to reduce power purchases. Ranging from a few hundred kilowatts to tens of megawatts, they are somewhat smaller than the Wholesale Power systems; system size is determined by the industrial plant...

  16. Global plutonium management: A security option

    SciTech Connect (OSTI)

    Sylvester, K.W.B.

    1998-12-31

    The US surplus plutonium disposition program was created to reduce the proliferation risk posed by the fissile material from thousands of retired nuclear weapons. The Department of Energy has decided to process its Put into a form as secure as Pu in civilian spent fuel. While implementation issues have been considered, a major one (Russian reciprocity) remains unresolved. Russia has made disposition action conditional on extracting the fuel value of its Pu but lacks the infrastructure to do so. Assistance in the construction of the required facilities would conflict with official US policy opposing the development of a Pu fuel cycle. The resulting stagnation provides impetus for a reevaluation of US nonproliferation objectives and Pu disposition options. A strategy for satisfying Russian fuel value concerns and reducing the proliferation risk posed by surplus weapons-grade plutonium (WGPu) is proposed. The effectiveness of material alteration (e.g., isotopic, chemical, etc.{hor_ellipsis}) at reducing the desire, ability and opportunity for proliferation is assessed. Virtually all the security benefits attainable by material processing can be obtained by immobilizing Pu in large unit size/mass monoliths without a radiation barrier. Russia would be allowed to extract the Pu at a future date for use as fuel in a verifiable manner. Remote tracking capability, if proven feasible, would further improve safeguarding capability. As an alternate approach, the US could compensate Russia for its Pu, allowing it to be disposed of or processed elsewhere. A market based method for pricing Pu is proposed. Surplus Pu could represent access to nuclear fuel at a fixed price at a future date. This position can be replicated in the uranium market and priced using derivative theory. The proposed strategy attempts to meet nonproliferation objectives by recognizing technical limitations and satisfying political constraints.

  17. Station Footprint: Separation Distances, Storage Options, and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Light Duty Fuel Cell Electric Vehicle Hydrogen Fueling Protocol H2FIRST Reference Station Design Task: Project Deliverable 2-2 On-Board Storage Systems Analysis...

  18. Scarcity of Ideas and R&D Options: Use it, Lose it or Bank it.

    E-Print Network [OSTI]

    Scotchmer, Suzanne; Erkal, Nisvan

    2009-01-01

    Strategic Delay in a Real Options Model of R&D Competition,"low cost. Our model is a real options model in the spirit ofa value to delay. In many real options models, the value of

  19. Scarcity of Ideas and R&D Options: Use it, Lose it, or Bank it

    E-Print Network [OSTI]

    Scotchmer, Suzanne

    2009-01-01

    Strategic Delay in a Real Options Model of R&D Competition,"ideas; imagination; innovation; real options; search models;low cost. Our model is a real options model in the spirit of

  20. Real Options Valuation of U.S. Federal Renewable Energy Research, Development, Demonstration, and Deployment

    E-Print Network [OSTI]

    Siddiqui, Afzal S.; Marnay, Chris; Wiser, Ryan H.

    2005-01-01

    N ATIONAL L ABORATORY Real Options Valuation of US FederalBerkeley, 18 March 2005 Real Options Valuation of US Federalabove by developing a real options model of RE RD 3 that

  1. Competitiveness of Soil Carbon as an Option: Is it a Bridge to the

    E-Print Network [OSTI]

    McCarl, Bruce A.

    Competitiveness of Soil Carbon as an Option: Is it a Bridge to the Future? Competitiveness of Soil CarbonCompetitiveness of Soil Carbon as an Option: Is it a Bridge to theas an Option: Is it a Bridge

  2. Valuing innovative technology R&D as a real option : application to fuel cell vehicles

    E-Print Network [OSTI]

    Tsui, Maggie

    2005-01-01

    This thesis aims to elucidate real option thinking and real option valuation techniques for innovative technology investment. Treating the fuel cell R&D investment as a real option for General Motor's light passenger vehicle ...

  3. Natural Gas as a Fuel Option for Heavy Vehicles

    SciTech Connect (OSTI)

    James E. Wegrzyn; Wai Lin Litzke; Michael Gurevich

    1999-04-26

    The U.S. Department of Energy (DOE), Office of Heavy Vehicle Technologies (OHVT) is promoting the use of natural gas as a fuel option in the transportation energy sector through its natural gas vehicle program [1]. The goal of this program is to eliminate the technical and cost barriers associated with displacing imported petroleum. This is achieved by supporting research and development in technologies that reduce manufacturing costs, reduce emissions, and improve vehicle performance and consumer acceptance for natural gas fueled vehicles. In collaboration with Brookhaven National Laboratory, projects are currently being pursued in (1) liquefied natural gas production from unconventional sources, (2) onboard natural gas storage (adsorbent, compressed, and liquefied), (3) natural gas delivery systems for both onboard the vehicle and the refueling station, and (4) regional and enduse strategies. This paper will provide an overview of these projects highlighting their achievements and current status. In addition, it will discuss how the individual technologies developed are being integrated into an overall program strategic plan.

  4. Energy Efficiency Tax Credits, Rebates and Financing: What Options...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Financing: What Options Are Available for You? Financing Energy-Efficient Homes Use solar power to heat water and more Today's solar power is highly efficient. You can buy...

  5. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01

    26 5. The Impact of Financing Structure on the Cost of Solarthose options impact the cost of solar power, this reportFinancing Structure on the Cost of Solar Energy A variety of

  6. Real options approach to capacity planning under uncertainty

    E-Print Network [OSTI]

    Mittal, Geetanjali, 1979-

    2004-01-01

    This thesis highlights the effectiveness of Real Options Analysis (ROA) in capacity planning decisions for engineering projects subject to uncertainty. This is in contrast to the irreversible decision-making proposed by ...

  7. Female Scientists, Engineers Open Students' Eyes to Career Options

    Broader source: Energy.gov [DOE]

    More than six dozen middle school girls visited INL to learn about career options in science and engineering at the annual My Amazing Future event organized by Idaho Women in Nuclear.

  8. Building America Expert Meeting: Windows Options for New and...

    Broader source: Energy.gov (indexed) [DOE]

    NorthernSTAR Building America Partnership held an Expert Meeting on Windows Options for New and Existing Homes on November 14, 2011 at the Nolte Building on the campus of the...

  9. Accurate Approximations for EuropeanStyle Asian Options

    E-Print Network [OSTI]

    ://www.cs.cmu.edu/sjha; Ashok Varikooty, CS First Boston, avarikoo@fir.fbc.com. #12; Keywords: Computational finance, option [13], interestrates and commodities such as crude oil [5]. Several researchers have devised

  10. UCF Computer Science MS Program of Study (POS) Nonthesis Option

    E-Print Network [OSTI]

    Stanley, Kenneth O.

    UCF Computer Science MS Program of Study (POS) Nonthesis Option Required Core Courses (6 Credit Abbreviations * a definition of each type of transfer work can be found in: Clear POS Print POS Save POS

  11. Measures and Investment Options for Community Energy Conservation

    E-Print Network [OSTI]

    Myers, M. S.; Korinchock, D.

    1986-01-01

    and demand management as a cheaper option than the construction of a new power plant. Municipalities consider energy efficiency because it promotes awareness and therefore helps keep utility bills low for its citizens. The two viewpoints may combine...

  12. Early Draft Energy Policy and Financing Options to

    E-Print Network [OSTI]

    Early Draft Energy Policy and Financing Options to Achieve Solar Penetration Targets: Accounting for PV. We discuss existing energy-policy mixes in those countries leading the development of solar power .................................................................................................................. 6 3. HIDDEN BENEFITS OF SOLAR ENERGY

  13. Application of real options to reverse logistics process

    E-Print Network [OSTI]

    Kaga, Akihiro, 1975-

    2004-01-01

    In this thesis, real options are used to identify the optimal model for the reverse logistics process of a technology company in the circuit board business. Currently, customers return defective boards and the company ...

  14. Ghana-Assessing Policy Options for Increasing the Use of Renewable...

    Open Energy Info (EERE)

    Ghana-Assessing Policy Options for Increasing the Use of Renewable Energy for Sustainable Development Jump to: navigation, search Name Assessing Policy Options for Increasing the...

  15. Montana State University 1 Paleontology Option

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    upper division credits. These courses prepare the student for a variety of jobs and/or graduate school 141 - College Chemistry I 4 CHMY 143 - College Chemistry II 4 ERTH 101IN - Earth System Sciences 4

  16. Wastewater sludge management options for Honduras

    E-Print Network [OSTI]

    Bhattacharya, Mahua, M. Eng. Massachusetts Institute of Technology.

    2009-01-01

    Sludge management is a fundamental area of concern across wastewater treatment systems in Honduras. The lack of timely sludge removal has led to declining plant performance in many facilities throughout the country. In ...

  17. Moving granular-bed filter development program - option 1 - component test facilities

    SciTech Connect (OSTI)

    Newby, R.A.; Yang, W.C.; Smelzer, E.E.; Lippert, T.E.

    1995-08-01

    The Westinghouse Science & Technology Center has proposed a novel moving granular bed filter concept, the Standleg Moving Granular Bed Filter (SMGBF). The SMGBF has inherent advantages over the current state-of-the-art moving granular bed filter technology and is potentially competitive with ceramic barrier filters. The SMGBF system combines several unique features that make it highly effective for use in advanced coal-fueled power plants, such as pressurized fluidized-bed combustion (PFBC), and integrated coal-gasification combined cycles (IGCC). The SMGBF is being developed in a phased program having an initial Base Contract period followed by optional periods. The Base Contract period was successfully completed and previously documented by Westinghouse. The Option 1 period, {open_quote}Component Test Facilities{close_quotes}, has also been completed and its results are reported in this document. The objective of the Option 1 program was to optimize the performance of the SMGBF system through component testing focused on the major technology issues. The SMGBF has been shown to be a viable technology in both cold flow simulations and high-temperature, high-pressure testing, and conditions to lead to best performance levels have been identified. Several development activities remain to be complete before the SMGBF can achieve commercial readiness.

  18. Compensation for Distributed Solar. A Survey of Options to Preserve Stakeholder Value

    SciTech Connect (OSTI)

    Flores-Espino, Francisco

    2015-09-01

    Compensation mechanisms for electricity generation systems installed behind the meter are under scrutiny in several jurisdictions in the United States. Legislators in 29 states introduced bills to amend net metering provisions in 2014, and in 33 states in the 2015 legislative session as of August 20, 2015. Some utilities have also sought to increase the revenue they receive from net-metered customers through rate redesign. The circumstances that have triggered the recent push for change include a growing percentage of net-metered customers, potential effects of distributed generation on cost allocation, decreasing photovoltaic (PV) system costs, the challenges of integrating high levels of solar generation in the distribution network, and increasing pressure on utility business models. This report presents a survey of options to charge and compensate PV customers, as well as options that may preserve utility revenues in scenarios with increased DG. These options could be used as building blocks to create a distributed generation (DG) compensation policy that may preserve the value of the different stakeholders and balance their interests.

  19. Augmented lagrange hopfield network for economic dispatch with multiple fuel options

    SciTech Connect (OSTI)

    Dieu, Vo Ngoc; Ongsakul, Weerakorn; Polprasert, Jirawadee [Energy Field of Study, School of Environment, Resources and Development, Asian Institute of Technology, Klongluang, Pathumthani (Thailand)

    2011-06-20

    This paper proposes an augmented Lagrange Hopfield network (ALHN) for solving economic dispatch (ED) problem with multiple fuel options. The proposed ALHN method is a continuous Hopfield neural network with its energy function based on augmented Lagrangian function. The advantages of ALHN over the conventional Hopfield neural network are easier use, more general applications, faster convergence, better optimal solution, and larger scale of problem implementation. The method solves the problem by directly searching the most suitable fuel among the available fuels of each unit and finding the optimal solution for the problem based on minimization of the energy function of the continuous Hopfield neural network. The proposed method is tested on systems up to 100 units and the obtained results are compared to those from other methods in the literature. The results have shown that the proposed method is efficient for solving the ED problem with multiple fuel options and favorable for implementation in large scale problems.

  20. Electricity Demand-Side Management for an Energy Efficient Future in China: Technology Options and Policy Priorities

    E-Print Network [OSTI]

    de Weck, Olivier L.

    Neufville Professor of Engineering Systems Chair, ESD Education Committee #12;2 #12;3 Electricity DemandElectricity Demand-Side Management for an Energy Efficient Future in China: Technology Options: ______________________________________________________________ : Stephen R. Connors Director, Analysis Group for Regional Electricity Alternatives Thesis Supervisor

  1. Pedro J. Miana Analisis Funcional

    E-Print Network [OSTI]

    Miana, Pedro J.

    como ecuaciones integrales, superficies minimales, ecuaciones en derivadas parciales, analisis armua en el pro- blema de la cuerda y membrana vibrantes y los problemas de contorno de las ecuaciones ecuaciones integrales. Volterra al estudiar la variacion del area encerrada por una curva cuando la curva

  2. Extreme Programming (XP) Pedro Cabalar

    E-Print Network [OSTI]

    Cabalar, Pedro

    Warning! XP hacking XP code-and-fix programming XP = disciplined development customers Business analysts or marke>ng specialists in the same company than SW

  3. DATAOVERWRITESECURITY SYSTEM (DOSS)

    E-Print Network [OSTI]

    McLaughlin, Richard M.

    /Compliance ISO 15408 Common Criteria Certification (EAL 3). This certifi- cation is a recognized worldwide's DOSS option provides the following advantages: ISO 15408 Common Criteria Certified1 (EAL 3 Feature key covers (to prevent usage when the system is enabled with the DOSS option). Certification

  4. Applications of subsea systems

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The authors discuss their experience in offshore engineering, worldwide subsea technology, civil design and construction. This book is a guide to subsea systems and components. The authors assess options for field developments - technically and economically and an evaluation of the advantages and disadvantages of various available options.

  5. Nondestructive Assay Options for Spent Fuel Encapsulation

    SciTech Connect (OSTI)

    Tobin, Stephen J.; Jansson, Peter

    2014-10-02

    This report describes the role that nondestructive assay (NDA) techniques and systems of NDA techniques may have in the context of an encapsulation and deep geological repository. The potential NDA needs of an encapsulation and repository facility include safeguards, heat content, and criticality. Some discussion of the facility needs is given, with the majority of the report concentrating on the capability and characteristics of individual NDA instruments and techniques currently available or under development. Particular emphasis is given to how the NDA techniques can be used to determine the heat production of an assembly, as well as meet the dual safeguards needs of 1) determining the declared parameters of initial enrichment, burn-up, and cooling time and 2) detecting defects (total, partial, and bias). The report concludes with the recommendation of three integrated systems that might meet the combined NDA needs of the encapsulation/repository facility.

  6. Accelerator Driven Nuclear Energy: The Thorium Option

    ScienceCinema (OSTI)

    Raja, Rajendran

    2010-01-08

    Conventional nuclear reactors use enriched Uranium as fuel and produce nuclear waste which needs to be stored away for over 10,000 years. At the current rate of use, existing sources of Uranium will last for 50-100 years. We describe a solution to the problem that uses particle accelerators to produce fast neutrons that can be used to burn existing nuclear waste and produce energy. Such systems, initially proposed by Carlo Rubbia and collaborators in the 1990's, are being seriously considered by many countries as a possible solution to the green energy problem. Accelerator driven reactors operate in a sub-critical regime and, thus, are safer and can obtain energy from plentiful elements such as Thorium-232 and Uranium-238. What is missing is the high intensity (10MW) accelerator that produces 1 GeV protons. We will describe scenarios which if implemented will make such systems a reality.

  7. Options for the Immobilisation of UK Civil Plutonium

    SciTech Connect (OSTI)

    Scales, C.R.; Maddrell, E.R.; Harrison, M.T. [Nexia Solutions Ltd., Cumbria, CA (United Kingdom)

    2007-07-01

    As a result of the reprocessing of spent nuclear fuel the UK expects to accumulate in excess of 100 tonnes of separated plutonium. There is currently no long term strategy for the management of this material. The Nuclear Decommissioning Authority (NDA) has commissioned a programme with Nexia Solutions to examine the alternatives for the disposition of this material and subsequently present the NDA with technically underpinned option(s) for plutonium disposition. The overall programme comprises two main options, re-use as fuel in reactors and immobilisation in the event of being declared surplus to requirements and is targeted specifically at the requirements of the UK. The disposition programme will take account of the UK reactor portfolio, and the quantity that may require immobilisation will depend on future UK nuclear strategy. Immobilisation options are being reviewed in the light that a proportion of the stockpile could be declared waste. The options for immobilisation are being assessed in the expectation that any immobilised product would be destined for an as yet undefined repository, preceded by a period of storage in secure facilities. Potential products are being developed to be compatible with a wide range of disposal scenarios. (authors)

  8. Automotive Deployment Option Projection Tool (ADOPT) Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12Power, Inc | DepartmentPeer20Insulated Cladding Systems

  9. On the Solution of Complementarity Problems Arising in American Options Pricing

    E-Print Network [OSTI]

    Nocedal, Jorge

    throughout the trading day, the options prices change as well. Re-pricing a large options book in real timeOn the Solution of Complementarity Problems Arising in American Options Pricing Liming Feng Vadim, as well as in more general stochastic models in finance, the price of an American option solves

  10. English spoken Bachelor programme European Studies 2013-2014 Options for the third year

    E-Print Network [OSTI]

    Twente, Universiteit

    1 English spoken Bachelor programme European Studies 2013-2014 Options for the third year Option 1 The third option is do an exchange programme of 20 EC or 30 EC in the first semester of the third year courses in the third quartile (2A) . The optional courses should be European Studies related or cover

  11. Option Prices under Generalized Pricing BERTRAM D URING Duering@uni-mainz.de

    E-Print Network [OSTI]

    Dring, Bertram

    Option Prices under Generalized Pricing Kernels BERTRAM D URING Duering@uni-mainz.de Institut f solutions for European option prices are derived for a class of rather general asset specific pricing of the Black and Scholes (1973) option pricing formula and the Heston (1993) option pricing formula for non

  12. 327 Building liquid waste handling options modification project plan

    SciTech Connect (OSTI)

    Ham, J.E.

    1998-03-28

    This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study is to reevaluate the existing preferred alternative and select a new preferred alternative, if appropriate. Based on the new or confirmed preferred alternative, this study will also provide a conceptual design and cost estimate for required modifications to the 327 Facility to allow removal of RLWS and treatment of the RLW generated during deactivation.

  13. Emission control options for mine diesels

    SciTech Connect (OSTI)

    Waytulonis, R.W. (Bureau of Mines, Twin Cities, MN (USA). Twin Cities Research Center)

    1991-03-01

    New exhaust control techniques and devices may be necessary to meet future diesel particulate matter emission standards in underground coal mines. This paper reviews conventional work practices and devices used to control diesel exhaust emissions, and new techniques being tested by the US Bureau of Mines. Discussions center on important work practices and on the function and efficiency of exhaust aftertreatment devices. An industry-government cooperative research project to develop and test an exhaust aftertreatment system for part 36 equipment is also discussed.

  14. Residential Prosumers: Drivers and Policy Options

    Office of Energy Efficiency and Renewable Energy (EERE)

    The rise of the solar photovoltaic "prosumers" has the potential to transform the 100-year-old centralized electric utility model into a more decentralized and interactive system. In some countries, it is now more cost-effective for households to produce their own power from PV than to purchase electricity from the grid. However, a prosumer "revolution" under which decentralized adoption of PV occurs on its own, in the absence of supportive policies or regulatory conditions, has not yet arrived. Self-consumption of solar PV is a growing trend globally, but its expansion remains within policy makers ability to control and develop.

  15. EVALUATION OF TRANSPORTATION OPTIONS FOR INTERMEDIATE NON DESTRUCTIVE EXAMINATIONS

    SciTech Connect (OSTI)

    Case, Susan; Hoggard, Gary

    2014-07-01

    Idaho National Laboratory (INL) shipments of irradiated experiments from the Advanced Test Reactor (ATR) to the Hot Fuels Examination Facility (HFEF) have historically been accomplished using the General Electric Model 2000 (GE 2000) Type B shipping container. Battelle Energy Alliance (BEA) concerns regarding the future availability and leasing and handling costs associated with the GE 2000 cask have warranted an evaluation of alternative shipping options. One or more of these shipping options may be utilized to perform non destructive examinations (NDE) such as neutron radiography and precision gamma scans of irradiated experiments at HFEF and then return the experiments to ATR for further irradiation, hereafter referred to as intermediate NDE.

  16. SRF cavities for CW option of Project X Linac

    SciTech Connect (OSTI)

    Solyak, N.; Gonin, I.; Khabiboulline, T.; Lunin, A.; Perunov, N.; Yakovlev, V.; /Fermilab

    2009-09-01

    Alternative option of Project X is based on the CW SC 2GeV Linac with the average current 1mA. Possible option of the CW Linac considered in the paper includes low energy part consisted of a few families SC Spoke cavities (from 2.5 MeV to 466 MeV) and high energy part consisted of 2 types of elliptical cavities (v/c=0.81 and v/c=1). Requirements and designed parameters of cavities are considered.

  17. Impact of Nuclear Energy Futures on Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Dixon, B.W.; Piet, S.J.

    2004-10-03

    The Nuclear Waste Policy Act requires the Secretary of Energy to inform Congress before 2010 on the need for a second geologic repository for spent nuclear fuel. By that time, the spent fuel discharged from current commercial reactors will exceed the statutory limit of the first repository. There are several approaches to eliminate the need for another repository in this century. This paper presents a high-level analysis of these spent fuel management options in the context of a full range of possible nuclear energy futures. The analysis indicates the best option to implement varies depending on the nuclear energy future selected.

  18. Analyzing Options for Airborne Emergency Wireless Communications

    SciTech Connect (OSTI)

    Michael Schmitt; Juan Deaton; Curt Papke; Shane Cherry

    2008-03-01

    In the event of large-scale natural or manmade catastrophic events, access to reliable and enduring commercial communication systems is critical. Hurricane Katrina provided a recent example of the need to ensure communications during a national emergency. To ensure that communication demands are met during these critical times, Idaho National Laboratory (INL) under the guidance of United States Strategic Command has studied infrastructure issues, concerns, and vulnerabilities associated with an airborne wireless communications capability. Such a capability could provide emergency wireless communications until public/commercial nodes can be systematically restored. This report focuses on the airborne cellular restoration concept; analyzing basic infrastructure requirements; identifying related infrastructure issues, concerns, and vulnerabilities and offers recommended solutions.

  19. Doctoral Defense "Biogeochemical evaluation of disposal options for arsenic-

    E-Print Network [OSTI]

    Kamat, Vineet R.

    generated during drinking water treatment" Tara Clancy Date: December 2, 2014 Time: 9:00 AM Location: GM Lutgarde Raskin Professor, Civil & Environmental Engineering Arsenic contamination of drinking water of arsenic removal technologies requires disposal options for produced wastes that limit the release

  20. Environmental and Resource Studies (ERS) Program Formal Degree Options

    E-Print Network [OSTI]

    Fox, Michael

    major, or minor B.Sc. in Water Sciences 4 years; single major B.Sc. in Environmental Chemistry 3 or 4Environmental and Resource Studies (ERS) Program Formal Degree Options Bachelor of Environmental-University DegreesOffered through the ERS Program B.Sc. in Environmental & Resource Science 4 years; single/joint1

  1. FIRE Action Plan to Respond to Next Step Options

    E-Print Network [OSTI]

    1 FIRE Action Plan to Respond to Next Step Options Program Advisory Committee Report #2 July 3, 2001 The FIRE Action s are listed among the NSO-PAC2 recommendations. 1. Response to NSO PAC-1 Report Representatives of the FIRE project presented an action plan for how to respond to issues that had been raised

  2. FIRE Actions in Response to Next Step Options

    E-Print Network [OSTI]

    FIRE Actions in Response to Next Step Options Program Advisory Committee Report NSO-PAC CHARGES #1. The present level of effort in physics analysis is not fully adequate for ongoing high priority FIRE studies a strong focused effort on the FIRE physics and engineering studies. High priority must also be given

  3. MTS Evaluation Rubric: Thesis Option Student ________________________ Advisor or Reader ________________________

    E-Print Network [OSTI]

    Palmeri, Thomas

    MTS Evaluation Rubric: Thesis Option Student ________________________ Advisor or Reader ________________________ Each thesis is unique in focus and content. To do a thesis well requires the academic capacities and skills listed below, which are developed through MTS coursework. Please review the thesis and evaluate

  4. Robust Regression Analysis: Some Popular Statistical Package Options

    E-Print Network [OSTI]

    Masci, Frank

    1 Robust Regression Analysis: Some Popular Statistical Package Options By Robert A. Yaffee Meyer of SAS, Institute for their gracious assistance. Robust regression analysis provides an alternative to a least squares regression model when fundamental assumptions are unfulfilled by the nature

  5. ANU E Press The options, the differences, and the benefits

    E-Print Network [OSTI]

    Botea, Adi

    Publishing your book: ANU E Press The options, the differences, and the benefits Presenters: Lorena? General tips How ANU E Press can help you What is the digital repository? 2 #12;The book 3 #12;Idea publishers and ANU E Press peer- reviewed research publications open access electronic textbooks non

  6. ORIGINAL ARTICLE Composting is an effective treatment option for

    E-Print Network [OSTI]

    California at Berkeley, University of

    ORIGINAL ARTICLE Composting is an effective treatment option for sanitization of Phytophthora of California, Berkeley, CA, USA 2 Sonoma Compost, Sonoma, CA, USA 3 McEvoy Ranch, Marin, CA, USA Introduction.1111/j.1365-2672.2006.03008.x Abstract Aims: To determine the effects of heat and composting treatments

  7. Memorandum, Enhanced Career Longevity and Retirement Options- June 30, 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    On March 31, 2009, the Department of Energy (DOE) Chief Health, Safety and Security Officxer commissioned a study to examine "realistic and reasponable options for improving the career opportunities and retirement prospects of protective force members while maintaining, within current and anticipated budgetary constraints, a robust and effective security posture.

  8. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect (OSTI)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  9. Technology options and effective policies to reduce greenhouse gas

    E-Print Network [OSTI]

    Technology options and effective policies to reduce greenhouse gas emissions and improve security); DNE21+ model. National Institute for Environmental Studies (Japan); AIM model. Natural Resources both the climate problem and security of supply, and thus provide synergies, while others represent

  10. DESIGN REQUIREMENTS AND OPTIONS FOR FINAL FOCUSING SUPERCONDUCTING MAGNETS

    E-Print Network [OSTI]

    DESIGN REQUIREMENTS AND OPTIONS FOR FINAL FOCUSING SUPERCONDUCTING MAGNETS OF HEAVY-ION DRIVERS L design challenges. The mag- nets are quadrupoles, used for final focusing of beam arrays. Because. Because of the close contact between them, it is in- teresting to explore design concepts that exploit

  11. School of Art -Montana State University ART HISTORY OPTION

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    School of Art - Montana State University ART HISTORY OPTION 120 credits are required for graduation: 42 of these credits must be numbered 300 or above. ART REQUIREMENTS (77 credits) A. FOUNDATIONS (16 Students will receive 3 cr of Diversity toward Core Requirements when they complete 102, 201 or 220 D. ART

  12. BSc Mathematics There are no options in the first year

    E-Print Network [OSTI]

    Applebaum, David

    should think carefully about what they want to do in their fourth year. The fourth year courses mayBSc Mathematics 1st year There are no options in the first year 1st year -> 2nd year In the second what they might want to do in their third year and check which courses are needed as a pre

  13. DIRECT USE OF NATURAL GAS: ANALYSIS AND POLICY OPTIONS

    E-Print Network [OSTI]

    Electric heat efficiency - 1.0 Heat pump efficiency - 2.0 Electric water heat efficiency - .88 Combined1 DIRECT USE OF NATURAL GAS: ANALYSIS AND POLICY OPTIONS Northwest Power Planning Council Issue gas as a fuel for electricity generation. In the Northwest Power Planning Council's 1991 Northwest

  14. "THE NUCLEAR OPTION IN GREEK NATIONAL ENERGY POLICY

    E-Print Network [OSTI]

    "THE NUCLEAR OPTION IN GREEK NATIONAL ENERGY POLICY: A RENAISSANCE OR A DJA VUE" by RAPHAEL MOISSIS; Starting from as early as the late 1950's, many scientists produced paper studies on nuclear application: Governor Demopoulos Establishes "Nuclear Office" #12; Mid to late 1970's Konstantinos Karamanlis

  15. RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING

    E-Print Network [OSTI]

    Maranas, Costas

    RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman valuations and a risk management analysis for balancing risk versus reward tradeoffs. The resulting valuation that minimize risk for a specified level of return, to begin Phase I clinical testing from a set of candidate

  16. BACHELOR OF SCIENCE BIOLOGY ECOLOGY & EVOLUTIONARY BIOLOGY OPTION

    E-Print Network [OSTI]

    Kemp, Brian M.

    BACHELOR OF SCIENCE BIOLOGY ECOLOGY & EVOLUTIONARY BIOLOGY OPTION A Bachelor of Science degree hours must be upper division coursework. A B.S. in Biology requires a minimum of 19 semester hours of core BIOLOGY courses (BIOLOGY 106, 107, 301, 372 and 405 or 403). An additional 21 semester hours

  17. Quantum Finance Hamiltonian for Coupon Bond European and Barrier Options

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Quantum Finance Hamiltonian for Coupon Bond European and Barrier Options Belal E. Baaquie RMI are financial derivatives that can be analyzed in the Hamiltonian formulation of quantum finance. Forward-2963 Fax: (65) 6777-6126 Email: phybeb@nus.edu.sg #12;Quantum Finance Hamiltonian for Coupon Bond European

  18. On-Going Comparison of Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Piet, S.J.; Bennett, R.G.; Dixon, B.W.; Herring, J.S.; Shropshire, D.E.; Roth, M.; Smith, J.D.; Finck, P.; Hill, R.; Laidler, J.; Pasamehmetoglu, K.

    2004-10-03

    This paper summarizes the current comprehensive comparison of four major fuel cycle strategies: once-through, thermal recycle, thermal+fast recycle, fast recycle. It then proceeds to summarize comparison of the major technology options for the key elements of the fuel cycle that can implement each of the four strategies - separation processing, transmutation reactors, and fuels.

  19. Evaluation of Optional Cancellation Contracts using Quantitative Finance Techniques

    E-Print Network [OSTI]

    Zubelli, Jorge Passamani

    market. There are two ways of transporting natural gas: pipelines and liquefied natural gas (LNG). If there is a pipeline available, then it is the cheapest transportation option. LNG is the choice when no pipeline is available. LNG takes up to 1/600th the volume of natural gas. It requires special ships, known as LNG

  20. Database Managament IS&M Option Mark Levene

    E-Print Network [OSTI]

    Levene, Mark

    Book Stores The Invisible Web Initial Definition of a Database. A database is an organised collection Relation ISBN LOCATION QUANTITY LOAN 0-8053-0249-2 Science 1 0 0-201-52878-9 Main 3 2 0-07-044754-3 Main 1Database Managament IS&M Option Mark Levene Email: m.levene@dcs.bbk.ac.uk Web: http

  1. Assessing Novel Foundation Options for Offshore Wind Turbines

    E-Print Network [OSTI]

    Byrne, Byron

    Assessing Novel Foundation Options for Offshore Wind Turbines B.W. Byrne, BE(Hons), BCom, MA, DPhil G.T. Houlsby, MA, DSc, FREng, FICE Oxford University, UK SYNOPSIS Offshore wind farms, and of these wind power is the only one to be exploited on a commercial scale at present. Three major offshore

  2. Diplme Inter-Universitaire Sant au Travail Option Infirmier

    E-Print Network [OSTI]

    Brest, Universit de

    Diplme Inter-Universitaire Sant au Travail Option Infirmier Anne Universitaire 2012 des Infirmiers en Sant au Travail (IST) en leur donnant de nouvelles fonctions au sein des services du Diplme d'infirmier franais ou europen ou autorisation d'exercer le mtier d'infirmier

  3. CHEMISTRY, B.S.C. CHEMISTRY OPTION (CHEC)

    E-Print Network [OSTI]

    Hamburger, Peter

    CHEMISTRY, B.S.C. CHEMISTRY OPTION (CHEC) (Fall 2015-Summer 2016) IPFW Residency Requirements of the American Chemical Society (ACS), and B.S.C. graduates are certified. ______ 1 CHM 19400 Freshman Chemistry Orientation ______ 4 CHM 11500 General Chemistry ______ 4 CHM 11600 General Chemistry ______ 4 CHM 24100 Intro

  4. CHEMISTRY, B.S.C. BIOCHEMISTRY OPTION (CHEB)

    E-Print Network [OSTI]

    Hamburger, Peter

    CHEMISTRY, B.S.C. BIOCHEMISTRY OPTION (CHEB) (Fall 2015-Summer 2016) IPFW Residency Requirements in Gen Ed CHEMISTRY BSC COURSES & SUPPORTING COURSES (85 credits) *Note: 2.0 CHM GPA required/2.0 CHM GPA of the American Chemical Society (ACS), and B.S.C. graduates are certified. ______ 1 CHM 19400 Freshman Chemistry

  5. CHEMISTRY, B. S. WITH TEACHER CERTIFICATE CHEMISTRY OPTION (CHMT)

    E-Print Network [OSTI]

    Hamburger, Peter

    CHEMISTRY, B. S. WITH TEACHER CERTIFICATE CHEMISTRY OPTION (CHMT) (Fall 2015-Summer 2016) IPFW- or above in Gen Ed Chemistry BS Courses (62 credits) *Note: 3.0 CHM GPA required/2.0 CHM GPA in 300+ courses ______ 1 CHM 19400 Freshman Chemistry Orientation ______ 4 CHM 11500 General Chemistry ______ 4

  6. DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS

    SciTech Connect (OSTI)

    Lobdell, D.; Geimer, R.; Larsen, P.; Loveland, K.

    2003-02-27

    The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best manage lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.

  7. Analysis of Green Energy Options for The Phipps Conservatory

    E-Print Network [OSTI]

    Attari, Shahzeen Z.

    1 Analysis of Green Energy Options for The Phipps Conservatory Shahzeen Attari Elisabeth Gilmore power and thermal energy via on-site generation or purchases of renewable energy credits: 1) A 5kW solid and succulent plants. Presently, the conservatory is undergoing a major renovation and expansion. An explicit

  8. SURVEY OF EARNED DOCTORATES (SED) WEB REGISTRATION OPTION

    E-Print Network [OSTI]

    Omiecinski, Curtis

    SURVEY OF EARNED DOCTORATES (SED) WEB REGISTRATION OPTION Congratulations on completing your recipients will now be able to register directly via the web and instantaneously receive a PIN and password about the web survey, please do not hesitate to contact us: 4800-sed@norc.uchicago.edu or 1

  9. Numerical Convergence Properties of Option Pricing PDEs with Uncertain Volatility

    E-Print Network [OSTI]

    Forsyth, Peter A.

    is then simply the cost of this hedge. The principal source of risk is the price of the underlying assetNumerical Convergence Properties of Option Pricing PDEs with Uncertain Volatility D. M. Pooley , P, 2001 Abstract The pricing equations derived from uncertain volatility models in finance are often cast

  10. MODULAR CONSTRUCTION SYSTEM EVALUATION

    SciTech Connect (OSTI)

    S. Gillespie

    2002-08-08

    The purpose of this study is to respond to U.S. Department of Energy (DOE) Technical Direction Letter (TDL) 02-003 (Waisley 2001), which directs Bechtel SAIC Company, LLC (BSC) to complete a design study to recommend repository design options to support receipt and/or emplacement of any or all of the following: commercial spent nuclear fuel (CSNF), high-level radioactive waste (HLW), DOE-managed spent nuclear fuel (DSNF) (including naval spent nuclear fuel [SNF]), and immobilized plutonium (if available), as soon as practicable, but no later than 2010. From the possible design options, a recommended approach will be determined for further evaluation to support the preliminary design of the repository. This study integrates the results of the repository Design Evolution Study (Rowe 2002) with supporting studies concerning national transportation options (BSC 2002b) and Nevada transportation options (Gehner 2002). The repository Design Evolution Study documents the processes used to reevaluate the design, construction, operation, and cost of the repository in response to TDL 02-003 (Waisley 2001), and to determine possible repository conceptual design options. The transportation studies evaluate the national and Nevada transportation options that support the repository conceptual design options. An evaluation methodology was established, based on Program-level requirements developed for the study in reference BSC 2001a, to allow the repository and system design options to be evaluated on a consistent basis. The transportation options and the design components were integrated into system design implementation options, which were evaluated using receipt and emplacement scenarios. The scenarios tested the ability of the design concept to adapt to changes in funding, waste receipt rate, and Nevada rail transportation availability. The results of the evaluation (in terms of system throughput, cost, and schedule) were then compared to the Program-level requirements, and recommendations for design alternatives, requirements changes, or further evaluation were developed.

  11. Evaluation of food waste disposal options by LCC analysis from the perspective of global warming: Jungnang case, South Korea

    SciTech Connect (OSTI)

    Kim, Mi-Hyung; Song, Yul-Eum; Song, Han-Byul; Kim, Jung-Wk; Hwang, Sun-Jin

    2011-09-15

    Highlights: > Various food waste disposal options were evaluated from the perspective of global warming. > Costs of the options were compared by the methodology of life cycle assessment and life cycle cost analysis. > Carbon price and valuable by-products were used for analyzing environmental credits. > The benefit-cost ratio of wet feeding scenario was the highest. - Abstract: The costs associated with eight food waste disposal options, dry feeding, wet feeding, composting, anaerobic digestion, co-digestion with sewage sludge, food waste disposer, incineration, and landfilling, were evaluated in the perspective of global warming and energy and/or resource recovery. An expanded system boundary was employed to compare by-products. Life cycle cost was analyzed through the entire disposal process, which included discharge, separate collection, transportation, treatment, and final disposal stages, all of which were included in the system boundary. Costs and benefits were estimated by an avoided impact. Environmental benefits of each system per 1 tonne of food waste management were estimated using carbon prices resulting from CO{sub 2} reduction by avoided impact, as well as the prices of by-products such as animal feed, compost, and electricity. We found that the cost of landfilling was the lowest, followed by co-digestion. The benefits of wet feeding systems were the highest and landfilling the lowest.

  12. An Integrated Real options Framework for model-based identification and valuation of options under uncertainty

    E-Print Network [OSTI]

    Mikaelian, Tsoline

    2009-01-01

    Complex systems and enterprises, such as those typical in the aerospace industry, are subject to uncertainties that may lead to suboptimal performance or even catastrophic failures if unmanaged. This work focuses on ...

  13. Option Markets for Water in California: Effective Management of Water Supply Risk

    E-Print Network [OSTI]

    Williams, Jeffrey

    2007-01-01

    Price Agricultural Node Option Price Table 2. Comparison ofStrike Price (Percentage Above Average Water Value). Tableprice, option value at the higher-value C5 is higher than at C3. Table

  14. Managing a portfolio of real options : sequential exploration of dependent prospects

    E-Print Network [OSTI]

    Smith, James L.

    2004-01-01

    We consider the impact of sequential investment and active management on the value of a portfolio of real options. The options are assumed to be interdependent, in that exercise of any one is assumed to produce, in addition ...

  15. A generalized real options methodology for evaluating investments under uncertainty with application to air transportation

    E-Print Network [OSTI]

    Miller, Bruno, 1974-

    2005-01-01

    Real options analysis is being increasingly used as a tool to evaluate investments under uncertainty; however, traditional real options methodologies have some shortcomings that limit their utility, such as the use of the ...

  16. Apply option-thinking in long term infrastructure investment : the case of commercial real estate

    E-Print Network [OSTI]

    Zhang, Na, S.M. Massachusetts Institute of Technology

    2010-01-01

    Over the last two decades the application of real options theory has dramatically altered the way researches model infrastructure investment decisions. Real options are the right, but not obligation to do something for a ...

  17. Energy Demand and Emissions in Building in China: Scenarios and Policy Options

    E-Print Network [OSTI]

    Kejun, J.; Xiulian, H.

    2006-01-01

    including transport), taking into account the most up-to-date data and recent policy discussions that will affect future economic, population, and energy supply trends. To understand the role of policy options including technology options and countermeasures...

  18. Energy, Product, and Economic Implications of Environmental Compliance Options- A Southern California Case Study

    E-Print Network [OSTI]

    Kyricopoulos, P. F.; Dennison, W. J.

    1994-01-01

    Industrial plants that are faced with regulated emissions constraints may also have a complex array of compliance options from which to choose. Technology options may include a number of pollution control alternatives: ...

  19. The $2000 Electric Powertrain Option-1 Program. Final technical report

    SciTech Connect (OSTI)

    NONE

    1999-06-01

    This report describes the tasks accomplished as part of Northrop Grumman's TRP $2000 Electric Powertrain Option-1 program. Northrop Grumman has strived to achieve technology advances and development considered as high priority to the success of future electric vehicles. Northrop Grumman has achieved the intent of the program by taking several steps toward reducing the cost of the electric vehicle powertrain, demonstrating technologies in the form of hardware and introducing enhancements into production that are consistent with the needs of the market.

  20. Wastewater and sludge control-technology options for synfuels industries

    SciTech Connect (OSTI)

    Castaldi, F.J.; Harrison, W.; Ford, D.L.

    1981-02-01

    The options examined were those of zero discharge, partial water reuse with restricted discharge of treated effluents, and unrestricted discharge of treated effluents. Analysis of cost data and performance-analyses data for several candidate secondary-wastewater-treatment unit processes indicated that combined activated-sludge/powdered-activated-carbon (AS/PAC) treatment incorporating wet-air-oxidation carbon regeneration is the most cost-effective control technology available for the removal of organic material from slagging, fixed-bed process wastewaters. Bench-scale treatability and organic-constituent removal studies conducted on process quench waters from a pilot-scale, slagging, fixed-bed gasifer using lignite as feedstock indicated that solvent extraction followed by AS/PAC treatment reduces levels of extractable and chromatographable organics to less than 1 ..mu..g/L in the final effluent. Levels of conventional pollutants also were effectively reduced by AS/PAC to the minimum water-quality standards for most receiving waters. The most favored and most cost-effective treatment option is unrestricted discharge of treated effluents with ultimate disposal of biosludges and landfilling of gasifier ash and slag. This option requires a capital expenditure of $8,260,000 and an annual net operating cost of $2,869,000 in 1978 dollars, exclusive of slag disposal. The net energy requirement of 19.6 x 10/sup 6/ kWh/year, or 15.3 kWh/1000 gal treated, is less than 6% of the equivalent energy demand associated with the zero-discharge option.

  1. An option pricing theory explanation of the invasion of Kuwait

    SciTech Connect (OSTI)

    Muhtaseb, M.R.

    1995-12-31

    The objective of this paper is to explain the invasion of Kuwait by making an analogy between a call option and the Iraq-Kuwait situation before the invasion on August 2, 1990. A number of factors contributed to the issuance of a deep-in-the money European call option to Iraq against Kuwait. The underlying asset is the crude oil reserves under Kuwait. Price of crude oil is determined in world spot markets. The exercise price is equal to the cost of permanently annexing and retaining Kuwait. The volatility is measured by the annualized variance of the weekly rate of return of the spot price of crude oil. Time-to-expiration is equal to the time period between decision date and actual invasion date. Finally, since crude oil prices are quoted in U.S. dollars, the U.S. Treasury bill rate is assumed to be the risk-free rate. In a base-case scenario, Kuwait`s oil reserves amount to 94,500 million barrels valued at $18 a barrell in early February 1990 resulting in a market value of $1,701 billion. Because the cost of the war to Iraq is not known, we assume it is comparable to that of the U.S.-led coalition of $51.0 billion. Time-to-expiration is six months. The treasury bill rate in early 1990 was around 7.5 percent. Annualized standard deviation of weekly rates of return is 0.216. The value of Kuwait`s invasion option is $1,642.25 billion. Depending on the scenario, the value of this special option ranged between $1,450 billion and $3.624 billion. 10 refs., 1 tab.

  2. Field development options for a waterflooded heavy-oil reservoir

    SciTech Connect (OSTI)

    Kasraie, M. ); Sammon, P.H. ); Jespersen, P.J. )

    1993-09-01

    Battrum Unit 4 is a moderately heavy-oil reservoir in Saskatchewan producing under waterflood from a thin sand. This paper describes a history match of previous field behavior and systematically analyzes through the use of numerical simulation the potential benefits to production of further waterflooding (with and without infill drilling), steamflooding, and horizontal drilling. It is found that the remaining oil recovery potential of a steamflood with horizontal well is significantly higher than that of any of the waterflood options.

  3. Expert Meeting Report: Windows Options for New and Existing Homes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order 13514 Federal Leadership Lessons Learned Windows Options

  4. Study on Alternative Cargo Launch Options from the Lunar Surface

    SciTech Connect (OSTI)

    Cheryl A. Blomberg; Zamir A. Zulkefli; Spencer W. Rich; Steven D. Howe

    2013-07-01

    In the future, there will be a need for constant cargo launches from Earth to Mars in order to build, and then sustain, a Martian base. Currently, chemical rockets are used for space launches. These are expensive and heavy due to the amount of necessary propellant. Nuclear thermal rockets (NTRs) are the next step in rocket design. Another alternative is to create a launcher on the lunar surface that uses magnetic levitation to launch cargo to Mars in order to minimize the amount of necessary propellant per mission. This paper investigates using nuclear power for six different cargo launching alternatives, as well as the orbital mechanics involved in launching cargo to a Martian base from the moon. Each alternative is compared to the other alternative launchers, as well as compared to using an NTR instead. This comparison is done on the basis of mass that must be shipped from Earth, the amount of necessary propellant, and the number of equivalent NTR launches. Of the options, a lunar coil launcher had a ship mass that is 12.7% less than the next best option and 17 NTR equivalent launches, making it the best of the presented six options.

  5. Uranium enrichment: investment options for the long term

    SciTech Connect (OSTI)

    Not Available

    1983-01-01

    The US government supplies a major portion of the enriched uranium used to fuel most of the nuclear power plants that furnish electricity in the free world. As manager of the US uranium enrichment concern, the Department of Energy (DOE) is investigating a number of technological choices to improve enrichment service and remain a significant world supplier. The Congress will ultimately select a strategy for federal investment in the uranium enrichment enterprise. A fundamental policy choice between possible future roles - that of the free world's main supplier of enrichment services, and that of a mainly domestic supplier - will underlie any investment decision the Congress makes. The technological choices are gaseous diffusion, gas centrifuge, and atomic vapor laser isotope separation (AVLIS). A base plan and four alternatives were examined by DOE and the Congressional Budget Office. In terms of total enterprise costs, Option IV, ultimately relying on advanced gas centrifuges for enrichment services, would offer the most economic approach, with costs over the full projection period totaling $123.5 billion. Option III, ultimately relying on AVLIS without gas centrifuge enrichment or gaseous diffusion, falls next in the sequence, with costs of $128.2 billion. Options I and II, involving combinations of the gas centrifuge and AVLIS technologies, follow closely with costs of $128.7 and $129.6 billion. The base plan has costs of $136.8 billion over the projection period. 1 figure, 22 tables.

  6. A new volatility term in the theory of options with transaction costs

    E-Print Network [OSTI]

    Alexander Morozovsky

    2000-04-03

    The introduction of transaction costs into the theory of option pricing could lead not only to the change of return for options, but also to the change of the volatility. On the base of assumption of the portfolio analysis, a new equation for option pricing with transaction costs is derived. A new solution for the option price is obtained for the time close to expiration date.

  7. Preconceptual ABC design definition and system configuration layout

    SciTech Connect (OSTI)

    Barthold, W. [Barthold & Associates, Inc., Knoxville, TN (United States)

    1995-03-01

    This document is the conceptual design document for the follow-on to the Molten Salt Breeder Reactor, known as the ABC type reactor. It addresses blanket design options, containment options, off-gas systems, drainage systems, and components/layouts of the primary, secondary, and tertiary systems, and it contains a number of diagrams for the configuration of the major systems.

  8. Multinomial Approximating Models for Options Hemantha S. B. Herath* and Pranesh Kumar**

    E-Print Network [OSTI]

    Kumar, Pranesh

    , Johnson 1987, and Stulz 1982). These models are useful for valuing real options having multiple sourcesMultinomial Approximating Models for Options Hemantha S. B. Herath* and Pranesh Kumar** Business@unbc.ca; Tel: (250) 960-6671 #12;2 Multinomial Approximating Models for Options Abstract. We ensure non

  9. Flexible Facility Interior Layout: A Real Options and Chung-Li Tseng

    E-Print Network [OSTI]

    Tseng, Chung-Li

    Flexible Facility Interior Layout: A Real Options Approach Tong Zhao and Chung-Li Tseng Abstract needs to constantly exercise managerial real options, such as partitioning a big unit to small units. In this situation, the interior layout can be changed easily within a short time. In this paper, we take a real-options

  10. Bounds for the price of discrete arithmetic Asian options M. Vanmaele

    E-Print Network [OSTI]

    Vanmaele, Michle

    on discrete averaging which is the normal specification in real contracts. Discrete arithmetic Asian optionsBounds for the price of discrete arithmetic Asian options M. Vanmaele , G. Deelstra , J. Liinev , J.Goovaerts@econ.kuleuven.ac.be, Tel. +32 16 326750. #12;Bounds for the price of discrete arithmetic Asian options Abstract

  11. English spoken Bachelor programme European Studies 2014-2015 Options for the third year

    E-Print Network [OSTI]

    Twente, Universiteit

    1 English spoken Bachelor programme European Studies 2014-2015 Options for the third year Option 1 an exchange programme of 20 EC or 30 EC in the first semester of the third year. A minor of 30 EC means courses in the third quartile (2A) . The optional courses should be European Studies related or cover

  12. A comparison of option prices under different pricing measures in a stochastic volatility model

    E-Print Network [OSTI]

    A comparison of option prices under different pricing measures in a stochastic volatility model option prices in an incomplete stochastic volatility model with correlation. In a general setting, we prove an ordering result which says that prices for European options with convex payoffs are decreasing

  13. Option prices in a model with stochastic disaster risk Sang Byung Seo

    E-Print Network [OSTI]

    Kahana, Michael J.

    Option prices in a model with stochastic disaster risk Sang Byung Seo University of Pennsylvania Mellon University, Cornell University and the Wharton school for helpful comments. #12;Option prices. Thus it is of interest to know whether these models have the potential to explain option prices as well

  14. The Skorokhod Embedding Problem and Model-Independent Bounds for Option Prices

    E-Print Network [OSTI]

    The Skorokhod Embedding Problem and Model-Independent Bounds for Option Prices David Hobson July 20 for the pricing of financial options is to pos- tulate a model and then to calculate the price of a contingent we can observe traded option prices, but know little or nothing about the model. Hence the question

  15. Effect of Large Disturbances on the Local Behavior of Nonlinear Physically Interconnected Systems

    E-Print Network [OSTI]

    Hirche, Sandra

    ]: International Energy Agency, "Empowering variable renewables Options for flexible electricity systems Motivation Sensitivity in electric power systems: Subcritical instability & Ill-conditionedness - [2

  16. Carbon Dioxide Capture and Transportation Options in the Illinois Basin

    SciTech Connect (OSTI)

    M. Rostam-Abadi; S. S. Chen; Y. Lu

    2004-09-30

    This report describes carbon dioxide (CO{sub 2}) capture options from large stationary emission sources in the Illinois Basin, primarily focusing on coal-fired utility power plants. The CO{sub 2} emissions data were collected for utility power plants and industrial facilities over most of Illinois, southwestern Indiana, and western Kentucky. Coal-fired power plants are by far the largest CO{sub 2} emission sources in the Illinois Basin. The data revealed that sources within the Illinois Basin emit about 276 million tonnes of CO2 annually from 122 utility power plants and industrial facilities. Industrial facilities include 48 emission sources and contribute about 10% of total emissions. A process analysis study was conducted to review the suitability of various CO{sub 2} capture technologies for large stationary sources. The advantages and disadvantages of each class of technology were investigated. Based on these analyses, a suitable CO{sub 2} capture technology was assigned to each type of emission source in the Illinois Basin. Techno-economic studies were then conducted to evaluate the energy and economic performances of three coal-based power generation plants with CO{sub 2} capture facilities. The three plants considered were (1) pulverized coal (PC) + post combustion chemical absorption (monoethanolamine, or MEA), (2) integrated gasification combined cycle (IGCC) + pre-combustion physical absorption (Selexol), and (3) oxygen-enriched coal combustion plants. A conventional PC power plant without CO2 capture was also investigated as a baseline plant for comparison. Gross capacities of 266, 533, and 1,054 MW were investigated at each power plant. The economic study considered the burning of both Illinois No. 6 coal and Powder River Basin (PRB) coal. The cost estimation included the cost for compressing the CO{sub 2} stream to pipeline pressure. A process simulation software, CHEMCAD, was employed to perform steady-state simulations of power generation systems and CO{sub 2} capture processes. Financial models were developed to estimate the capital cost, operations and maintenance cost, cost of electricity, and CO{sub 2} avoidance cost. Results showed that, depending on the plant size and the type of coal burned, CO{sub 2} avoidance cost is between $47/t to $67/t for a PC +MEA plant, between $22.03/t to $32.05/t for an oxygen combustion plant, and between $13.58/t to $26.78/t for an IGCC + Selexol plant. A sensitivity analysis was conducted to evaluate the impact on the CO2 avoidance cost of the heat of absorption of solvent in an MEA plant and energy consumption of the ASU in an oxy-coal combustion plant. An economic analysis of CO{sub 2} capture from an ethanol plant was also conducted. The cost of CO{sub 2} capture from an ethanol plant with a production capacity of 100 million gallons/year was estimated to be about $13.92/t.

  17. Expanding the Pool of Federal Policy Options to Promote Industrial Energy Efficiency

    SciTech Connect (OSTI)

    Brown, Dr. Marilyn Ann; Cox, Matthew; Jackson, Roderick K; Lapsa, Melissa Voss

    2011-01-01

    Improving the energy efficiency of industry is essential for maintaining the viability of domestic manufacturing, especially in a world economy where production is shifting to low-cost, less regulated developing countries. Numerous studies have shown the potential for significant cost-effective energy-savings in U.S. industries, but the realization of this potential is hindered by regulatory, information, workforce, and financial obstacles. This report evaluates seven federal policy options aimed at improving the energy efficiency of industry, grounded in an understanding of industrial decision-making and the barriers to efficiency improvements. Detailed analysis employs the Georgia Institute of Technology's version of the National Energy Modeling System and spreadsheet calculations, generating a series of benefit/cost metrics spanning private and public costs and energy bill savings, as well as air pollution benefits and the social cost of carbon. Two of the policies would address regulatory hurdles (Output-Based Emissions Standards and a federal Energy Portfolio Standard with Combined Heat and Power); three would help to fill information gaps and workforce training needs (the Superior Energy Performance program, Implementation Support Services, and a Small Firm Energy Management program); and two would tackle financial barriers (Tax Lien Financing and Energy-Efficient Industrial Motor Rebates). The social benefit-cost ratios of these policies appear to be highly favorable based on a range of plausible assumptions. Each of the seven policy options has an appropriate federal role, broad applicability across industries, utilizes readily available technologies, and all are administratively feasible.

  18. Cooperative Monitoring Center Occasional Paper/8: Cooperative Border Security for Jordan: Assessment and Options

    SciTech Connect (OSTI)

    Qojas, M.

    1999-03-01

    This document is an analysis of options for unilateral and cooperative action to improve the security of Jordan's borders. Sections describe the current political, economic, and social interactions along Jordan's borders. Next, the document discusses border security strategy for cooperation among neighboring countries and the adoption of confidence-building measures. A practical cooperative monitoring system would consist of hardware for early warning, command and control, communications, and transportation. Technical solutions can expand opportunities for the detection and identification of intruders. Sensors (such as seismic, break-wire, pressure-sensing, etc.) can warn border security forces of intrusion and contribute to the identification of the intrusion and help formulate the response. This document describes conceptual options for cooperation, offering three scenarios that relate to three hypothetical levels (low, medium, and high) of cooperation. Potential cooperative efforts under a low cooperation scenario could include information exchanges on military equipment and schedules to prevent misunderstandings and the establishment of protocols for handling emergency situations or unusual circumstances. Measures under a medium cooperation scenario could include establishing joint monitoring groups for better communications, with hot lines and scheduled meetings. The high cooperation scenario describes coordinated responses, joint border patrols, and sharing border intrusion information. Finally, the document lists recommendations for organizational, technical, and operational initiatives that could be applicable to the current situation.

  19. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS : Appendices.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described. The document concludes with an evaluation of the potential effects that could result from implementing proposed actions. The conclusions are based on evaluation of existing data, utilization of numerical models, and application of logical inference. This volume contains the appendices.

  20. RADIOACTIVE WASTE STREAMS FROM VARIOUS POTENTIAL NUCLEAR FUEL CYCLE OPTIONS

    SciTech Connect (OSTI)

    Nick Soelberg; Steve Piet

    2010-11-01

    Five fuel cycle options, about which little is known compared to more commonly known options, have been studied in the past year for the United States Department of Energy. These fuel cycle options, and their features relative to uranium-fueled light water reactor (LWR)-based fuel cycles, include: Advanced once-through reactor concepts (Advanced Once-Through, or AOT) intended for high uranium utilization and long reactor operating life, use depleted uranium in some cases, and avoid or minimize used fuel reprocessing Fission-fusion hybrid (FFH) reactor concepts potential variations are intended for high uranium or thorium utilization, produce fissile material for use in power generating reactors, or transmute transuranic (TRU) and some radioactive fission product (FP) isotopes High temperature gas reactor (HTGR) concepts - intended for high uranium utilization, high reactor thermal efficiencies; they have unique fuel designs Molten salt reactor (MSR) concepts can breed fissile U-233 from Th fuel and avoid or minimize U fuel enrichment, use on-line reprocessing of the used fuel, produce lesser amounts of long-lived, highly radiotoxic TRU elements, and avoid fuel assembly fabrication Thorium/U-233 fueled LWR (Th/U-233) concepts can breed fissile U-233 from Th fuel and avoid or minimize U fuel enrichment, and produce lesser amounts of long-lived, highly radiotoxic TRU elements. These fuel cycle options could result in widely different types and amounts of used or spent fuels, spent reactor core materials, and waste streams from used fuel reprocessing, such as: Highly radioactive, high-burnup used metal, oxide, or inert matrix U and/or Th fuels, clad in Zr, steel, or composite non-metal cladding or coatings Spent radioactive-contaminated graphite, SiC, carbon-carbon-composite, metal, and Be reactor core materials Li-Be-F salts containing U, TRU, Th, and fission products Ranges of separated or un-separated activation products, fission products, and actinides. Waste forms now used or studied for used LWR fuels can be used for some of these waste streams but some waste forms may need to be developed for unique waste streams.

  1. Cost-effective Design Options for IsoDAR

    E-Print Network [OSTI]

    A. Adelmann; J. R. Alonso; W. Barletta; R. Barlow; L. Bartoszek; A. Bungau; L. Calabretta; A. Calanna; D. Campo; J. M. Conrad; Z. Djurcic; Y. Kamyshkov; H. Owen; M. H. Shaevitz; I. Shimizu; T. Smidt; J. Spitz; M. Toups; M. Wascko; L. A. Winslow; J. J. Yang

    2012-10-16

    This whitepaper reviews design options for the IsoDAR electron antineutrino source. IsoDAR is designed to produce $2.6 \\times 10^{22}$ electron antineutrinos per year with an average energy of 6.4 MeV, using isotope decay-at-rest. Aspects which must be balanced for cost-effectiveness include: overall cost; rate and energy distribution of the electron antineutrino flux and backgrounds; low technical risk; compactness; simplicity of underground construction and operation; reliability; value to future neutrino physics programs; and value to industry. We show that the baseline design outlined here is the most cost effective.

  2. Gas option: America's least-cost energy strategy

    SciTech Connect (OSTI)

    Lawrence, G.H.

    1980-05-17

    Public energy policy which acknowledges the gas option as having significant potential will increase supply incentives while decreasing demand restraints. The arguments developed by the Mellon Institute and others confirm the need to reject the Title II incremental pricing and the need to implement the Building Energy Performance Standards (BEPS). Positive evidence that proved reserves are higher than was thought has prompted the gas industry to fight incremental pricing as a barrier to a least-cost national energy strategy. BEPS, on the other hand, encourages more efficient use without eliminating industrial use. (DCK)

  3. ECONOMIC EVALUATION OF CO2 STORAGE AND SINK ENHANCEMENT OPTIONS

    SciTech Connect (OSTI)

    Bert Bock; Richard Rhudy; Howard Herzog; Michael Klett; John Davison; Danial G. De La Torre Ugarte; Dale Simbeck

    2003-02-01

    This project developed life-cycle costs for the major technologies and practices under development for CO{sub 2} storage and sink enhancement. The technologies evaluated included options for storing captured CO{sub 2} in active oil reservoirs, depleted oil and gas reservoirs, deep aquifers, coal beds, and oceans, as well as the enhancement of carbon sequestration in forests and croplands. The capture costs for a nominal 500 MW{sub e} integrated gasification combined cycle plant from an earlier study were combined with the storage costs from this study to allow comparison among capture and storage approaches as well as sink enhancements.

  4. Expert Meeting Report. Windows Options for New and Existing Homes

    SciTech Connect (OSTI)

    Ojczyck, C.; Carmody, J.; Haglund, K.

    2013-05-01

    The NorthernSTAR Building America Partnership held an Expert Meeting on Windows Options for New and Existing Homes on November 14, 2011, at the Nolte Building on the campus of the University of Minnesota in Minneapolis, MN. Featured speakers included John Carmody and Pat Huelman of the University of Minnesota, Charlie Curcija of Lawrence Berkeley National Laboratory, Jim Larson of Cardinal Glass Industries, Peter Yost of Building Green, Peter Baker of Building Science Corporation, and Theresa Weston of Du Pont Innovations. Audience participation was actively encouraged during each presentation to uncover need and promote dialog among researchers and industry professionals.

  5. Expert Meeting Report: Windows Options for New and Existing Homes

    SciTech Connect (OSTI)

    Ojczyk, C.; Carmody, J.; Haglund, K.

    2013-05-01

    The NorthernSTAR Building America Partnership held an Expert Meeting on Windows Options for New and Existing Homes on November 14, 2011 at the Nolte Building on the campus of the University of Minnesota in Minneapolis, MN. Featured speakers included John Carmody and Pat Huelman of the University of Minnesota, Charlie Curcija of Lawrence Berkeley National Laboratory, Jim Larson of Cardinal Glass Industries, Peter Yost of Building Green, Peter Baker of Building Science Corporation, and Theresa Weston of Du Pont Innovations. Audience participation was actively encouraged during each presentation to uncover need and promote dialog among researchers and industry professionals.

  6. India-Options for Low Carbon Development | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View NewGuam:on Openei |source Historypub [ICO] NameOptions for Low Carbon

  7. Hydrogen Delivery Infrastructure Option Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12,ExecutiveFinancingR Walls -Hydro-Pac Inc., A High HydrogenInvited GuestsOption

  8. Expanding Options for Nuclear Power | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program Management »Eric J.9ExecutiveOptions for

  9. Access Options for Electronic Theses and Dissertations (ETDs) The Graduate School and the Libraries require that all UW theses and dissertations be submitted

    E-Print Network [OSTI]

    Hochberg, Michael

    1 Access Options for Electronic Theses and Dissertations (ETDs) Background The Graduate School. Procedure Submission must be made using the UW ETD Administrator system which is provided by the ProQuest (PQ) company. ETD Administrator offers authors a number of menu choices, most of which are described

  10. Site license price adjustments for NPGowned journals with open access options Nature Publishing Group offers a number of options for authors wishing to publish with us, from

    E-Print Network [OSTI]

    Cai, Long

    Site license price adjustments for NPGowned journals with open access options Nature Publishing Group offers a number of options for authors wishing to publish with us, from open accessonly this is a real challenge for institutions, funders and publishers and we're examining how we might make things

  11. SOLID EARTH OPTION FOR EARTH SCIENCE (GYA/GYS) MAJORS The main goals of the Solid Earth option are to give you an understanding of how our lively

    E-Print Network [OSTI]

    Liu, Paul

    SOLID EARTH OPTION FOR EARTH SCIENCE (GYA/GYS) MAJORS The main goals of the Solid Earth option tools we use to unravel its complex history. Solid Earth science is the study of the materials, architecture, and processes of the dynamic solid Earth. It deals with rock-forming minerals and processes

  12. Real Time Pricing as a Default or Optional Service for C&I Customers: A Comparative Analysis of Eight Case Studies

    E-Print Network [OSTI]

    Barbose, Galen; Goldman, Charles; Bharvirkar, Ranjit; Hopper, Nicole; Ting, Michael; Neenan, Bernie

    2005-01-01

    Load Response Program Real Time Option is a unique examplePJM Economic LRP Real Time Option, PJM Emergency LRPPJM Economic LRP Real Time Option PowerShare QuoteOption

  13. On-Site Wastewater Treatment Systems: Alternative Collection Systems

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2000-08-30

    Rural Texas communities have new options for wastewater management infrastructure that are cost effective but still protect human health and environmental quality. Such communities now can combine different kinds of systems in a new approach called...

  14. Greenhouse gases mitigation options and strategies for Tanzania

    SciTech Connect (OSTI)

    Mwandosya, M.J.; Meena, H.E.

    1996-12-31

    Tanzania became a party to the United Nations Framework on Climate Change (UN FCCC) when she ratified the Convention in March, 1996. Now that Tanzania and other developing countries are Parties to the UN FCCC, compliance with its provisions is mandatory. The legal requirements therefore provide a basis for their participation in climate change studies and policy formulation. All parties to the Convention are required by Article 4.1 of the United Nations Convention on Climate Change (UN FCCC) to develop, periodically update, publish, and make available national inventories of anthropogenic emissions and removal of greenhouse gases that are not controlled by the Montreal Protocol. This study on possible options for the mitigation of greenhouse gases in Tanzania is a preliminary effort towards the fulfilment of the obligation. In order to fulfil their obligations under the UN FCCC and have a meaningful mitigation assessment, identification and quantification of anthropogenic sources of atmospheric emissions of greenhouse gases in the country was undertaken. In this respect, the study of anthropogenic emissions by source and removals by sink of GHGs in Tanzania was done with the main objective of increasing the quantity and quality of base-line data available in order to further scientific understanding of the relationship of greenhouse gas emissions to climate change. Furthermore, the study facilitated identification of national policy and technological options that could reduce the level of emissions in the country.

  15. Comparison of Options for a Pilot Plant Fusion Nuclear Mission

    SciTech Connect (OSTI)

    Brown, T; Goldston, R J; El-Guebaly, L; Kessel, C; Neilson, G H; Malang, S; Menard, J E; Prager, S; Waganer, L; Titus, P

    2012-08-27

    A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

  16. Refrigeration options for the Advanced Light Source Superbend Dipole Magnets

    SciTech Connect (OSTI)

    Green, M.A.; Hoyer, E.H.; Schlueter, R.D.; Taylor, C.E.; Zbasnik, J.; Wang, S.T.

    1999-07-09

    The 1.9 GeV Advance Light Source (ALS) at the Lawrence Berkeley National Laboratory (LBNL) produces photons with a critical energy of about 3.1 kev at each of its thirty-six 1.3 T gradient bending magnets. It is proposed that at three locations around the ring the conventional gradient bending magnets be replaced with superconducting bending magnets with a maximum field of 5.6 T. At the point where the photons are extracted, their critical energy will be about 12 keV. In the beam lines where the SuperBend superconducting magnets are installed, the X ray brightness at 20 keV will be increased over two orders of magnitude. This report describes three different refrigeration options for cooling the three SuperBend dipoles. The cooling options include: (1) liquid helium and liquid nitrogen cryogen cooling using stored liquids, (2) a central helium refrigerator (capacity 70 to 100 W) cooling all of the SuperBend magnets, (3) a Gifford McMahon (GM) cryocooler on each of the dipoles. This paper describes the technical and economic reasons for selecting a small GM cryocooler as the method for cooling the SuperBend dipoles on the LBNL Advanced Light Source.

  17. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  18. Teaching Direct Marketing and Small Farm Viability: Resources for Instructors, 2nd Edition. Part 9 - Land Tenure Options and Strategies

    E-Print Network [OSTI]

    2015-01-01

    right of refusal t) Option to buy u) Conservation easement v) Termination clause w) Contact information

  19. Options for improving the load matching capability of distributed photovoltaics: Methodology and application to high-latitude data

    SciTech Connect (OSTI)

    Widen, Joakim; Waeckelgaard, Ewa; Lund, Peter D.

    2009-11-15

    At high latitudes, domestic electricity demand and insolation are negatively correlated on both an annual and a diurnal basis. With increasing integration of distributed photovoltaics (PV) in low-voltage distribution grids of residential areas, limits to the penetration level are set by voltage rise due to unmatched production and load. In this paper a methodology for determining the impacts of three options for increased load matching is presented and applied to high-latitude data. The studied options are PV array orientation, demand side management (DSM) and electricity storage. Detailed models for domestic electricity demand and PV output are used. An optimisation approach is applied to find an optimal distribution of PV systems on different array orientations and a best-case evaluation of DSM and a storage model are implemented. At high penetration levels, storage is the most efficient option for maximising the solar fraction, but at lower overproduction levels, the impact of DSM is equal or slightly better. An east-west orientation of PV arrays is suggested for high penetration levels, but the effect of the optimised orientation is small. Without an optimised storage operation, the overproduced power is more efficiently reduced by DSM than storage, although this is highly dependent on the applied DSM algorithm. Further research should be focused on the DSM potential and optimal operation of storage. (author)

  20. Mitigation Options in Forestry, Land-Use, Change and Biomass Burning in Africa

    SciTech Connect (OSTI)

    Makundi, Willy R.

    1998-06-01

    Mitigation options to reduce greenhouse gas emissions and sequester carbon in land use sectors are describe in some detail. The paper highlights those options in the forestry sector, which are more relevant to different parts of Africa. It briefly outlines a bottom-up methodological framework for comprehensively assessing mitigation options in land use sectors. This method emphasizes the application of end-use demand projections to construct a baseline and mitigation scenarios and explicitly addresses the carbon storage potential on land and in wood products, as well as use of wood to substitute for fossil fuels. Cost-effectiveness indicators for ranking mitigation options are proposed, including those, which account for non-carbon monetary benefits such as those derived from forest products, as well as opportunity cost of pursuing specific mitigation option. The paper finally surveys the likely policies, barriers and incentives to implement such mitigation options in African countries .

  1. Reactor-Based Plutonium Disposition: Opportunities, Options, and Issues

    SciTech Connect (OSTI)

    Greene, S.R.

    1999-07-17

    The end of the Cold War has created a legacy of surplus fissile materials (plutonium and highly enriched uranium) in the United States (U.S.) and the former Soviet Union. These materials pose a danger to national and international security. During the past few years, the U.S. and Russia have engaged in an ongoing dialog concerning the safe storage and disposition of surplus fissile material stockpiles. In January 1997, the Department of Energy (DOE) announced the U. S. would pursue a dual track approach to rendering approximately 50 metric tons of plutonium inaccessible for use in nuclear weapons. One track involves immobilizing the plutonium by combining it with high-level radioactive waste in glass or ceramic ''logs''. The other method, referred to as reactor-based disposition, converts plutonium into mixed oxide (MOX) fuel for nuclear reactors. The U.S. and Russia are moving ahead rapidly to develop and demonstrate the technology required to implement the MOX option in their respective countries. U.S. MOX fuel research and development activities were started in the 1950s, with irradiation of MOX fuel rods in commercial light water reactors (LWR) from the 1960s--1980s. In all, a few thousand MOX fuel rods were successfully irradiated. Though much of this work was performed with weapons-grade or ''near'' weapons-grade plutonium--and favorable fuel performance was observed--the applicability of this data for licensing and use of weapons-grade MOX fuel manufactured with modern fuel fabrication processes is somewhat limited. The U.S. and Russia are currently engaged in an intensive research, development, and demonstration program to support implementation of the MOX option in our two countries. This paper focuses on work performed in the U.S. and provides a brief summary of joint U.S./Russian work currently underway.

  2. State options for low-carbon coal policy

    SciTech Connect (OSTI)

    Richard Cowart; Shanna Vale; Joshua Bushinsky; Pat Hogan

    2008-02-15

    There is growing state-level interest in the USA in accelerating the development of low-carbon coal technologies, including carbon capture and storage (CCS). Many states have adopted greenhouse gas emission targets and made commitments to low-carbon energy, and believe that these polices will result in job creation, air quality improvements, and reliable low-cost energy supplies. This paper provides an overview of options for states to encourage the deployment of carbon capture and sequestration. It describes actions (including legislation, regulations, and incentives) throughout the country. It also reviews in greater detail the range of policies available to state Public Utility Commissions for advancing deployment of CCS. Many states are adopting meaningful incentives for integrated gasification combined cycle (IGCC) power plants, and, as a handful of states are beginning to demonstrate, a number of these incentives can apply to CCS as well. States also have a number of authorities relevant to advancement of clean coal power, particularly within the domain of state public utility commissions (PUCs). State commissions have a wide array of policy options available to them in pursuing this goal, and will play a crucial role in determining the speed and effectiveness with which such technologies are deployed. States also enjoy major advantages, such as their direct jurisdiction over many critical power plant issues (including siting and retail ratemaking) that federal agencies do not possess. Regardless of the final form of federal greenhouse gas rules, states have the chance to gain experience as first movers and policy innovators, and will play an important role in shaping a low-carbon future. Although national policy is essential, a proactive approach by state policymakers and regulators to drive CCS can reduce future compliance costs, speed the required technological developments, and pave the way for future national policy.

  3. Assessment of Disposal Options for DOE-Managed High-Level Radioactive...

    Energy Savers [EERE]

    of Options for Permanent Geologic Disposal of Spent NuclearFuel and High-Level Radioactive Waste Repository Reference Disposal Concepts and Thermal Load Management Analysis...

  4. USED FUEL RAIL SHOCK AND VIBRATION TESTING OPTIONS ANALYSIS

    SciTech Connect (OSTI)

    Ross, Steven B.; Best, Ralph E.; Klymyshyn, Nicholas A.; Jensen, Philip J.; Maheras, Steven J.

    2014-09-29

    The objective of the rail shock and vibration tests is to complete the framework needed to quantify loads of fuel assembly components that are necessary to guide materials research and establish a technical basis for review organizations such as the U.S. Nuclear Regulatory Commission (NRC). A significant body of experimental and numerical modeling data exists to quantify loads and failure limits applicable to normal conditions of transport (NCT) rail transport, but the data are based on assumptions that can only be verified through experimental testing. The test options presented in this report represent possible paths for acquiring the data that are needed to confirm the assumptions of previous work, validate modeling methods that will be needed for evaluating transported fuel on a case-by-case basis, and inform material test campaigns on the anticipated range of fuel loading. The ultimate goal of this testing is to close all of the existing knowledge gaps related to the loading of used fuel under NCT conditions and inform the experiments and analysis program on specific endpoints for their research. The options include tests that would use an actual railcar, surrogate assemblies, and real or simulated rail transportation casks. The railcar carrying the cradle, cask, and surrogate fuel assembly payload would be moved in a train operating over rail track modified or selected to impart shock and vibration forces that occur during normal rail transportation. Computer modeling would be used to help design surrogates that may be needed for a rail cask, a casks internal basket, and a transport cradle. The objective of the design of surrogate components would be to provide a test platform that effectively simulates responses to rail shock and vibration loads that would be exhibited by state-of-the-art rail cask, basket, and/or cradle structures. The computer models would also be used to help determine the placement of instrumentation (accelerometers and strain gauges) on the surrogate fuel assemblies, cask and cradle structures, and the railcar so that forces and deflections that would result in the greatest potential for damage to high burnup and long-cooled UNF can be determined. For purposes of this report we consider testing on controlled track when we have control of the track and speed to facilitate modeling.

  5. Fall 2015 -2016 PARKING PERMIT RATES (as of 7/22/15) LOWER PRICE OPTIONS

    E-Print Network [OSTI]

    Fall 2015 - 2016 PARKING PERMIT RATES (as of 7/22/15) LOWER PRICE OPTIONS West Campus Lot Annual $550.00 Lot R Annual (Liberty Sq/Potomac Hts residents only) $575.00 RESERVED PARKING DECK PERMITS for the following parking options) Adjunct Faculty Permit Semester (only valid in Lot K, PV Lot, and the Field

  6. Generation, Use, Disposal, and Management Options for CCA-Treated Wood

    E-Print Network [OSTI]

    Florida, University of

    AND HAZARDOUS WASTE MANAGEMENT 2207 NW 13 Street, Suite D Gainesville, FL 32609 Report #98-1 #12;i TABLE Waste 20 CHAPTER III, MANAGEMENT OPTIONS III.1 Waste Minimization 34 III.2 Reuse 38 III.3 Recycling 39 of Management Options for CCA-Treated Wood 43 Waste Table A-1 Wood Treatment Plants Located in Florida A-2 to A

  7. Bachelor of Science in Information Sciences and Technology Integration and Application Option

    E-Print Network [OSTI]

    Squicciarini, Anna Cinzia

    Bachelor of Science in Information Sciences and Technology Integration and Application Option The 125-credit Bachelor of Science in Information Sciences and Technology (IST) online degree of Science in Security and Risk Analysis Information Cyber Security Option The 120-credit Bachelor of Science

  8. Carbon Dioxide Capture from Coal-Fired Power Plants: A Real Options Analysis Ram Chandra Sekar

    E-Print Network [OSTI]

    Carbon Dioxide Capture from Coal-Fired Power Plants: A Real Options Analysis by Ram Chandra Sekar;2 #12;3 Carbon Dioxide Capture in Coal-Fired Power Plants: A Real Options Analysis by Ram Chandra Sekar and Master of Science in Mechanical Engineering ABSTRACT Investments in three coal-fired power generation

  9. Capture-Ready Power Plants -Options, Technologies and Economics Mark C. Bohm

    E-Print Network [OSTI]

    1 Capture-Ready Power Plants - Options, Technologies and Economics by Mark C. Bohm Bachelor and Policy Program #12;2 #12;3 Capture-ready Power Plants Options, Technologies and Costs by Mark C. Bohm of a plant. Power plant owners and policymakers are interested in capture-ready plants because they may offer

  10. The Impact of Transmit Buffer on EDCF with Frame-Bursting Option for Wireless Networks

    E-Print Network [OSTI]

    Selvadurai, Selvakennedy

    a single contention, an optional feature known as controlled frame- bursting (CFB) is introduced in its with the CFB option to quantify its performance gain. The impact of the MAC transmit buffer size is also duration limit. It is demonstrated that an optimized CFB configuration allows the MAC protocol to achieve

  11. Taxation and Volatility Effects on Real Option Models: A Study of North Sea Oil Fields

    E-Print Network [OSTI]

    Moles, Peter; Constantinou, Charalambos; Kretzschmar, Gavin Lee

    2005-01-01

    that failure to incorporate the variable nature of tax into the valuation process leads to an 18 percent over valuation of asset PV and an under valuation of the option price by 19.5 percent. The increased usage of real option techniques in assessing oil field...

  12. Carbon Capture and Sequestration: how much does this uncertain option affect near-term policy choices?

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    Carbon Capture and Sequestration: how much does this uncertain option affect near-term policy Carbon Capture and Sequestration (CCS) as a key option to avoid costly emission reduction. While Carbon Capture and Sequestration (CCS) technologies are receiving increasing atten- tion, mainly

  13. Choosing optional units in SAMIS 1. Accessing the unit selection screens

    E-Print Network [OSTI]

    Burton, Geoffrey R.

    Choosing optional units in SAMIS 1 of 6 1. Accessing the unit selection screens Log in to SAMIS/View compulsory modules' link to access the unit selection screens #12;Choosing optional units in SAMIS 2 of 6 2 compulsory units which have been added to your records automatically Groups of modules from which you should

  14. "Our flexible and diverse program options respond to individual student needs." carleton.ca/socanth

    E-Print Network [OSTI]

    Dawson, Jeff W.

    "Our flexible and diverse program options respond to individual student needs." carleton and social conditions in diverse contexts throughout the world. We offer three program options: coursework work with their area of research interest, while gaining real- world experience. #12;This document

  15. Risk neutral valuation of options in multi-period discrete-time markets

    E-Print Network [OSTI]

    Risk neutral valuation of options in multi- period discrete-time markets In this lecture we study is the discounted expectation of its payoff under a martingale measure and use it to price call and put options Let F be an algebra of subsets of the finite sample space . Definition. A real-valued function (or

  16. Exploring Design Options Rationally Chris Bramwell, Bob Fields and Michael Harrison

    E-Print Network [OSTI]

    Fields, Bob

    , Criteria" notation. The means of captur- ing formal specifications and the reasoning behind design satisfy criteria and how design options can be combined to answer larger design questions. 1 Introduction with the Design Space Analysis framework and the QOC (Questions, Options, Criteria) nota- tion [8]. Using QOC

  17. CSci 4651 Fall 2008 Problem Set 11, optional, up to 25 points: study of programming

    E-Print Network [OSTI]

    Machkasova, Elena

    CSci 4651 Fall 2008 Problem Set 11, optional, up to 25 points: study of programming languages-study of programming languages. You have three options to choose from: To compare two existing programming languages. To describe in detail an existing programming language which we have not studied in class. The ones that we

  18. The Curious Incident of the Investment in the Market: Real Options and a Fair Gamble

    E-Print Network [OSTI]

    design this market in such a way that it seems unnatural for the manager to be able to take advantageThe Curious Incident of the Investment in the Market: Real Options and a Fair Gamble Jonathan in the Market: Real Options and a Fair Gamble "Is there any point to which you would wish to draw my attention

  19. Pricing of American retail options Christina Burton, McKay Heasley, Jeffrey Humpherys, Jialin Li

    E-Print Network [OSTI]

    Humpherys, Jeffrey

    and controlling inventories in a retail market. We propose a new class of American put option contracts. However, to improve market efficiency this option contract allows the retailer to freely adjust the sale]. In the retail markets, merchants hold inventories of goods and services much like investors hold portfolios

  20. S-Band Waveguide Reconfiguration Options for the LCLS RF Gun and L0 Klystron Feeds

    SciTech Connect (OSTI)

    McIntosh, P.

    2005-01-28

    This note highlights the possible re-configuration options for the existing WR284 S-band waveguide in the klystron gallery, to enable those existing 5045 klystrons to power the RF Gun and the L0 accelerating structures for LCLS. A reconfiguration decision based on the pros and cons for each option is subsequently identified.

  1. Europe, Cutting Biofuel Subsidies, Redirects Aid to Stress Greenest Options -New York Times January 22, 2008

    E-Print Network [OSTI]

    Europe, Cutting Biofuel Subsidies, Redirects Aid to Stress Greenest Options - New York Times January 22, 2008 Europe, Cutting Biofuel Subsidies, Redirects Aid to Stress Greenest Options By ELISABETH for biofuels, acknowledging that the environmental benefits of these fuels have often been overstated

  2. Page 1 of 2 Early Entry PhD Option Applicant Reference Form

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Page 1 of 2 Early Entry PhD Option Applicant Reference Form This applicant has applied to the Early Entry PhD Option in Nursing at the University of Wisconsin-Madison and has suggested you as a person of PhD Program Academic Student Services caaspinwall@wisc.edu Reference is for: In your opinion

  3. GREENHOUSE GAS EMISSION CONTROL OPTIONS: ASSESSING TRANSPORTATION AND ELECTRICITY GENERATION TECHNOLOGIES AND

    E-Print Network [OSTI]

    Kockelman, Kara M.

    1 GREENHOUSE GAS EMISSION CONTROL OPTIONS: ASSESSING TRANSPORTATION AND ELECTRICITY GENERATION, Environmental and Ecological Effects," August 2013. KEY WORDS: Greenhouse gases, transportation energy, electric options is an important step in formulating a cohesive strategy to abate U.S. greenhouse gas (GHG

  4. Real Option Pricing with Mean-Reverting Investment and Project Value

    E-Print Network [OSTI]

    Zubelli, Jorge Passamani

    is the valuation of the option to the invest in an oil field. Like most commodities, oil prices tend to mean-revert, and as a direct result the value of investment in an oil field is also mean-reverting. Consequently, it wouldReal Option Pricing with Mean-Reverting Investment and Project Value Sebastian Jaimungal , Max

  5. The Range of Traded Option Prices Mark H.A. Davis

    E-Print Network [OSTI]

    The Range of Traded Option Prices Mark H.A. Davis Imperial College London and David G. Hobson Suppose we are given a set of prices of European call options over a finite range of strike prices conditions for the prices to be consistent with an arbitrage- free model (in which case the model can

  6. RECOVERING A TIME-HOMOGENEOUS STOCK PRICE PROCESS FROM PERPETUAL OPTION PRICES

    E-Print Network [OSTI]

    RECOVERING A TIME-HOMOGENEOUS STOCK PRICE PROCESS FROM PERPETUAL OPTION PRICES ERIK EKSTROM AND DAVID HOBSON Abstract. It is well-known how to determine the price of perpetual American options if the underlying stock price is a time-homogeneous diffusion. In the present paper we consider the inverse problem

  7. ON THE RELATION BETWEEN OPTION AND STOCK PRICES: A CONVEX OPTIMIZATION APPROACH

    E-Print Network [OSTI]

    Bertsimas, Dimitris

    ON THE RELATION BETWEEN OPTION AND STOCK PRICES: A CONVEX OPTIMIZATION APPROACH DIMITRIS BERTSIMAS of option and stock prices based just on the no-arbitrage assumption, but without assuming any model for the underlying price dynamics, has a long history in the financial economics literature. We introduce convex and

  8. ON THE RISK-ADJUSTED PRICING-METHODOLOGY-BASED VALUATION OF VANILLA OPTIONS AND EXPLANATION

    E-Print Network [OSTI]

    Sevcovic, Daniel

    and perform extensive numerical testing of the model and compare the results to real option market data be used in qualitative and quantitative analyses of option market data. 1. Introduction In the past years a volatile portfolio are negligible. On the other hand, if transaction costs like, for example, bid

  9. State Heating Oil and Propane Program final report. Survey of No.2 heating oil and propane prices at the retail level October 2001 [sic] through March 2001 [SHOPP

    SciTech Connect (OSTI)

    2001-04-06

    Data collected by Division staff was entered into the EIA-PEDRO system. No written reports of data were required.

  10. Marketing energy conservation options to Northwest manufactured home buyers

    SciTech Connect (OSTI)

    Hendrickson, P.L.; Mohler, B.L.; Taylor, Z.T.; Lee, A.D.; Onisko, S.A.

    1985-06-01

    This study relies on extensive, existing survey data and new analyses to develop information that would help design a marketing plan to achieve energy conservation in new manufactured homes. Existing surveys present comprehensive information about regional manufactured home occupants and their homes that are relevant to a potential conservation marketing plan. An independent analysis of the cost-effectiveness of various efficiency improvements provides background information for designing a marketing plan. This analysis focuses on the economic impacts of alternative energy conservation options as perceived by the home owner. Identifying impediments to conservation investments is also very important in designing a marketing plan. A recent report suggests that financial constraints and the need for better information and knowledge about conservation pose the major conservation investment barriers. Since loan interest rates for new manufactured homes typically exceed site-built rates by a considerable amount and the buyers tend to have lower incomes, the economics of manufactured home conservation investments are likely to significantly influence their viability. Conservation information and its presentation directly influences the manufactured home buyer's decision. A marketing plan should address these impediments and their implications very clearly. Dealers express a belief that consumer satisfaction is the major advantage to selling energy efficient manufactured homes. This suggests that targeting dealers in a marketing plan and providing them direct information on consumers' indicated attitudes may be important. 74 refs.

  11. Carbon flows and economic evaluation of mitigation options in Tanzani's forest sector

    SciTech Connect (OSTI)

    Makundi, W.R.; Okinting'Ati, Aku

    1995-02-02

    This paper presents estimates of the rate of forest use, deforestation and forest degradation, as well as the corresponding carbon flows, in the Tanzanian forest sector. It is estimated that the country lost 525,000 ha of forests in 1990, with associated committed emissions of 31.5 Mt. Carbon (MtC), and 7.05 MtC of committed carbon sequestration. The paper then describes the possible response options in the forest sector to mitigate GHG emissions, and evaluates the most stable subset of these-i.e. forest conservation, woodfuel plantations and agroforestry. The conservation options were found to cost an average of U.S. $1.27 per tonne of carbon (tC) conserved. Five options for fuelwood plantations and agroforestry, with two different ownership regimes were evaluated. Each one of the options gives a positive net present value at low rates of discount, ranging from U.S. $1.06 to 3.4/1C of avoided emissions at 0 percent discount rate. At 10 percent discount, the eucalyptus and maize option has a highest PNV of U.S. $1.73 tC, and the government plantation gives a negative PNV (loss) of U.S. $0.13 tC sequestered. The options with a private/community type of ownership scheme fared better than government run options. This conclusion also held true when ranking the options by the BRAC indicator, with the government fuelwood plantation ranked the lowest, and the private agroforestry option of eucalyptus and corn performing best. The mitigation options evaluated here show that the forest sector in Tanzania has one of the most cost-effective GHG mitigation opportunities in the world, and they are within the developmental aspirations of the country.

  12. Diagnostic options for radiative divertor feedback control on NSTX-U

    SciTech Connect (OSTI)

    Soukhanovskii, V. A.; McLean, A. G. [Lawrence Livermore National Laboratory, Livermore, California, 94550 (United States); Gerhardt, S. P.; Kaita, R. [Princeton Plasma Physics Laboratory, Princeton, New Jersey 08540 (United States); Raman, R. [University of Washington, Seattle, Washington 98195 (United States)

    2012-10-15

    A radiative divertor technique is used in present tokamak experiments and planned for ITER to mitigate high heat loads on divertor plasma-facing components (PFCs) to prevent excessive material erosion and thermal damage. In NSTX, a large spherical tokamak with lithium-coated graphite PFCs and high divertor heat flux (q{sub peak} Less-Than-Or-Slanted-Equal-To 15 MW/m{sup 2}), radiative divertor experiments have demonstrated a significant reduction of divertor peak heat flux simultaneously with good core H-mode confinement using pre-programmed D{sub 2} or CD{sub 4} gas injections. In this work diagnostic options for a new real-time feedback control system for active radiative divertor detachment control in NSTX-U, where steady-state peak divertor heat fluxes are projected to reach 20-30 MW/m{sup 2}, are discussed. Based on the NSTX divertor detachment measurements and analysis, the control diagnostic signals available for NSTX-U include divertor radiated power, neutral pressure, spectroscopic deuterium recombination signatures, infrared thermography of PFC surfaces, and thermoelectric scrape-off layer current. In addition, spectroscopic 'security' monitoring of possible confinement or pedestal degradation is recommended. These signals would be implemented in a digital plasma control system to manage the divertor detachment process via an actuator (impurity gas seeding rate).

  13. SY Tank Farm ventilation isolation option risk assessment report

    SciTech Connect (OSTI)

    Powers, T.B.; Morales, S.D.

    1994-03-01

    The safety of the 241-SY Tank Farm ventilation system has been under extensive scrutiny due to safety concerns associated with tank 101-SY. Hydrogen and other gases are generated and trapped in the waste below the liquid surface. Periodically, these gases are released into the dome space and vented through the exhaust system. This attention to the ventilation system has resulted in the development of several alternative ventilation system designs. The ventilation system provides the primary means of mitigation of accidents associated with flammable gases. This report provides an assessment of various alternatives ventilation system designs.

  14. Homeowners Guide to Financing a Grid-Connected Solar Electric System

    SciTech Connect (OSTI)

    Solar Energy Technologies Program

    2010-10-11

    This guide provides an overview of the financing options that may be available to homeowners who are considering installing a solar electric system on their house.

  15. Homeowners Guide to Financing a Grid-Connected Solar Electric System (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-10-01

    This guide provides an overview of the financing options that may be available to homeowners who are considering installing a solar electric system on their house.

  16. Plug-In Hybrid Electric Vehicle Energy Storage System Design: Preprint

    SciTech Connect (OSTI)

    Markel, T.; Simpson, A.

    2006-05-01

    This paper discusses the design options for a plug-in hybrid electric vehicle, including power, energy, and operating strategy as they relate to the energy storage system.

  17. This sheet has sample occupations, work settings, employers, and career development activities associated with this major. Some of these options may require additional training and career planning. You are not limited to these options when choosing a poss

    E-Print Network [OSTI]

    Ronquist, Fredrik

    activities associated with this major. Some of these options may require additional training and career planning. You are not limited to these options when choosing a possible career path. Sample Occupations Real Estate Development: The ULI Guide to the Business.................

  18. Analysis of Energy Conservation Options for USDOE Child Development Center

    E-Print Network [OSTI]

    Bou-Saada, T. E.; Haberl, J. S.

    1993-01-01

    The Child Development Center (CDC) was designed to be a "showpiece" model building. Its construction included energy efficient features, including a photovoltaic system, solar hot water system, energy efficient lighting, and energy efficient heat...

  19. Power Plant Options Report for Thompson Island prepared by the

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    .................................................................... 11 4.1. Hybrid2 A Renewable Power System Model................................................ 11 4.......................................................................... 4 2.3. Thompson Island heating load....................................................................... 7 3. Grid-connected and Autonomous Renewable Power Systems ................................ 9 3

  20. Impact of Nuclear Energy Futures on Advanced Fuel Cycle Options

    SciTech Connect (OSTI)

    Brent W. Dixon; Steven J. Piet

    2004-10-01

    The Nuclear Waste Policy Act requires the Secretary of Energy to inform Congress before 2010 on the need for a second geologic repository for spent nuclear fuel. By that time, the spent fuel discharged from current commercial reactors will exceed the statutory limit of the first repository (63,000 MTiHM commercial, 7,000 MT non-commercial). There are several approaches to eliminate the need for another repository in this century. This paper presents a high-level analysis of these spent fuel management options in the context of a full range of possible nuclear energy futures. The analysis indicates the best option to implement varies depending on the nuclear energy future selected. The first step in understanding the need for different spent fuel management approaches is to understand the size of potential spent fuel inventories. A full range of potential futures for domestic commercial nuclear energy is considered. These energy futures are as follows: 1. Existing License Completion - Based on existing spent fuel inventories plus extrapolation of future plant-by-plant discharges until the end of each operating license, including known license extensions. 2. Extended License Completion - Based on existing spent fuel inventories plus a plant-by-plant extrapolation of future discharges assuming on all operating plants having one 20-year extension. 3. Continuing Level Energy Generation - Based on extension of the current ~100 GWe installed commercial base and average spent fuel discharge of 2100 MT/yr through the year 2100. 4. Continuing Market Share Generation Based on a 1.8% compounded growth of the electricity market through the year 2100, matched by growing nuclear capacity and associated spent fuel discharge. 5. Growing Market Share Generation - Extension of current nuclear capacity and associated spent fuel discharge through 2100 with 3.2% growth representing 1.5% market growth (all energy, not just electricity) and 1.7% share growth. Share growth results in tripling market share by 2100 from the current 8.4% to 25%, equivalent to continuing the average market growth of last 50 years for an additional 100 years. Five primary spent fuel management strategies are assessed against each of the energy futures to determine the number of geological repositories needed and how the first repository would be used. The geological repository site at Yucca Mountain, Nevada, has the physical potential to accommodate all the spent fuel that will be generated by the current fleet of domestic commercial nuclear reactors, even with license extensions. If new nuclear plants are built in the future as replacements or additions, the United States will need to adopt spent fuel treatment to extend the life of the repository. Should a significant number of new nuclear plants be built, advanced fuel recycling will be needed to fully manage the spent fuel within a single repository. The analysis also considers the timeframe for most efficient implementation of new spent fuel management strategies. The mix of unprocessed spent fuel and processed high level waste in Yucca Mountain varies with each future and strategy. Either recycling must start before there is too much unprocessed waste emplaced or unprocessed waste will have to be retrieved later with corresponding costs. For each case, the latest date to implement reprocessing without subsequent retrieval is determined.