Powered by Deep Web Technologies
Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Self-homodyne RF-optical microdisk receiver  

E-Print Network (OSTI)

modulation with optical transfer function (Po VRF 2 ) Self-homodyne RF-photonic receiver f ip Nonlinear and nonlinear modulation Transmittedoptical power t Wavelength t t Linear (Po VRF) Nonlinear (Po VRF 2) VRF ),,,,,( , 0 2 0 2 2 tPQGf dV Pd N EinoV VRF RF == = Microdisk optical mixer (laser= res) GV : voltage gain Q

Levi, Anthony F. J.

2

Development of a 400 Level 3C Clamped Downhole Seismic Receiver Array for 3D Borehole Seismic Imaging of Gas Reservoirs  

SciTech Connect

Borehole seismology is the highest resolution geophysical imaging technique available today to the oil and gas industry for characterization and monitoring of oil and gas reservoirs. However, the industry's ability to perform high resolution 3D imaging of deep and complex gas reservoirs using borehole seismology has been hampered by the lack of acquisition technology necessary to record large volumes of high frequency, high signal-to-noise-ratio borehole seismic data. This project took aim at this shortcoming by developing a 400 level 3C clamped downhole seismic receiver array, and accompanying software, for borehole seismic 3D imaging. This large borehole seismic array has removed the technical acquisition barrier for recording the data volumes necessary to do high resolution 3D VSP and 3D cross-well seismic imaging. Massive 3D VSP{reg_sign} and long range Cross-Well Seismology (CWS) are two of the borehole seismic techniques that promise to take the gas industry to the next level in their quest for higher resolution images of deep and complex oil and gas reservoirs. Today only a fraction of the oil or gas in place is produced when reservoirs are considered depleted. This is primarily due to our lack of understanding of detailed compartmentalization of oil and gas reservoirs. In this project, we developed a 400 level 3C borehole seismic receiver array that allows for economic use of 3D borehole seismic imaging for reservoir characterization and monitoring. This new array has significantly increased the efficiency of recording large data volumes at sufficiently dense spatial sampling to resolve reservoir complexities. The receiver pods have been fabricated and tested to withstand high temperature (200 C/400 F) and high pressure (25,000 psi), so that they can operate in wells up to 7,620 meters (25,000 feet) deep. The receiver array is deployed on standard production or drill tubing. In combination with 3C surface seismic or 3C borehole seismic sources, the 400 level receiver array can be used to obtain 3D 9C data. These 9C borehole seismic data provide both compressional wave and shear wave information that can be used for quantitative prediction of rock and pore fluid types. The 400-level borehole receiver array has been deployed successfully in a number of oil and gas wells during the course of this project, and each survey has resulted in marked improvements in imaging of geologic features that are critical for oil or gas production but were previously considered to be below the limits of seismic resolution. This added level of reservoir detail has resulted in improved well placement in the oil and gas fields that have been drilled using the Massive 3D VSP{reg_sign} images. In the future, the 400-level downhole seismic receiver array is expected to continue to improve reservoir characterization and drilling success in deep and complex oil and gas reservoirs.

Bjorn N. P. Paulsson

2006-09-30T23:59:59.000Z

3

Highly sensitive wide-dynamic range optical burst-mode receivers for ultra fast gain switching  

Science Conference Proceedings (OSTI)

Highly sensitive optical receivers in BiCMOS, sub-micron and deep-sub-micron CMOS technology are compared. Special attention is paid to burst-mode receivers with a wide-dynamic input range and with fast gain switching. A new burst-mode receiver design ... Keywords: Burst-mode receivers, Low noise, Optical receivers, Stability

K. Schneider; H. Zimmermann

2006-10-01T23:59:59.000Z

4

RECEIVED  

NLE Websites -- All DOE Office Websites (Extended Search)

40 40 ri,if--,r7n11-74"vtl Lit0 tait":,0 RECEIVED FFII 2 8 S96 OSTI The Winds of (Evolutionary) Change: Breathing New Life into Microbiology Gary J. Olsen,* Carl R. Woese,* and Ross A. Overbeekt DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark,

5

An optical-electrical sub-sampling down-conversion receiver with continuous-time [Sigma] [Delta] modulation  

E-Print Network (OSTI)

This thesis describes the design and implementation of an optical-electrical sub-sampling down-conversion receiver that employs [Sigma] [Delta] modulation. Accurate sub-sampling of an electrical RF signal in the optical ...

Park, Matthew (Matthew J.)

2005-01-01T23:59:59.000Z

6

Measuring the Optical Performance of Evacuated Receivers via an Outdoor Thermal Transient Test: Preprint  

DOE Green Energy (OSTI)

Modern parabolic trough solar collectors operated at high temperatures to provide the heat input to Rankine steam power cycles employ evacuated receiver tubes along the collector focal line. High performance is achieved via the use of a selective surface with a high absorptance for incoming short-wave solar radiation and a low emittance for outgoing long-wave infrared radiation, as well as the use of a hard vacuum to essentially eliminate convective and conductive heat losses. This paper describes a new method that determines receiver overall optical efficiency by exposing a fluid-filled, pre-cooled receiver to one sun outdoors and measuring the slope of the temperature curve at the point where the receiver temperature passes the glass envelope temperature (that is, the point at which there is no heat gain or loss from the absorber). This transient test method offers the potential advantages of simplicity, high accuracy, and the use of the actual solar spectrum.

Kutscher, C.; Burkholder, F.; Netter, J.

2011-08-01T23:59:59.000Z

7

SCRAM: a fast computational model for the optical performance of point fucus solar central receiver systems  

DOE Green Energy (OSTI)

Because of the complexities of heliostat shadowing and blocking calculations, computational models for the optical performance of point focus central receiver (PFCR) systems tend to be too slow for many important applications, such as optimization studies based on performance with realistic weather data. In this paper, a mathematical approximation procedure, designated Sandia Central Receiver Approximation Model (SCRAM) will be described. Rather than simulating the system components from first principles, it relies on data generated by the DELSOL code of Dellin and Fish for the optical performance of PFCR systems, and abstracts a mathematical model using a stepwise regression procedure. The result is a computational procedure which allows the user to define the heliostat field boundaries and tower height arbitrarily, generating a model for optical field performance, including shadowing, blocking, cosine, losses, and atmospheric attenuation, and which requires only a polynomial evaluation for each set of sun angles. A comparison with DELSOL for three different fields on three representative days indicates that the rms error of the approximation is 1-3% and that the new code is 1,000-3,000 times as fast as DELSOL. It is also shown that one reason that the accuracy in field performance predictions is higher than that of the generting function for the model is that much of the error in the generating function is due to an oscillatory behavior associated with a moire pattern in the optical response of the heiostat field.

Bergeron, K. D.; Chiang, C. J.

1980-04-01T23:59:59.000Z

8

Elevation angle alignment of quasi optical receiver mirrors of collective Thomson scattering diagnostic by sawtooth measurements  

Science Conference Proceedings (OSTI)

Localized measurements of the fast ion velocity distribution function and the plasma composition measurements are of significant interest for the fusion community. Collective Thomson scattering (CTS) diagnostics allow such measurements with spatial and temporal resolution. Localized measurements require a good alignment of the optical path in the transmission line. Monitoring the alignment during the experiment greatly benefits the confidence in the CTS measurements. An in situ technique for the assessment of the elevation angle alignment of the receiver is developed. Using the CTS diagnostic on TEXTOR without a source of probing radiation in discharges with sawtooth oscillations, an elevation angle misalignment of 0.9 Degree-Sign was found with an accuracy of 0.25 Degree-Sign .

Moseev, D. [FOM DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Nieuwegein (Netherlands); Max-Planck-Institut fuer Plasmaphysik, Euratom Association-IPP, 85748 Garching (Germany); Meo, F.; Korsholm, S. B.; Leipold, F.; Michelsen, P. K.; Nielsen, S. K.; Salewski, M.; Stejner, M. [Association EURATOM - DTU, Department of Physics, Technical University of Denmark, Riso Campus, 4000 Roskilde (Denmark); Bindslev, H. [Faculty of Science and Technology, Aarhus University, Ny Munkegade 120, DK-8000 Aarhus C (Denmark); Furtula, V. [Chalmers University of Technology, SE-412 96 Gothenburg (Sweden); Kantor, M. [FOM DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Nieuwegein (Netherlands); FZ Juelich GmbH, EURATOM, Trilateral Euregio Cluster, D-52425 Juelich (Germany); Ioffe Institute, RAS, Saint Petersburg 194021 (Russian Federation)

2012-10-15T23:59:59.000Z

9

Generation of a Parabolic Trough Collector Efficiency Curve from Separate Measurements of Outdoor Optical Efficiency and Indoor Receiver Heat Loss  

SciTech Connect

The thermal efficiency of a parabolic trough collector is a function of both the fraction of direct normal radiation absorbed by the receiver (the optical efficiency) and the heat lost to the environment when the receiver is at operating temperature. The thermal efficiency can be determined by testing the collector under actual operating conditions or by separately measuring these two components. This paper describes how outdoor measurement of the optical efficiency is combined with laboratory measurements of receiver heat loss to obtain the thermal efficiency curve. This paper describes this approach and also makes the case that there are advantages to plotting collector efficiency versus the difference between the operating temperature and the ambient temperature at which the receiver heat loss was measured divided by radiation to a fractional power (on the order of 1/3 but obtained via data regression) - as opposed to the difference between operating and ambient temperatures divided by the radiation. The results are shown to be robust over wide ranges of ambient temperature, sky temperature, and wind speed.

Kutscher, C.; Burkholder, F.; Stynes, J. K.

2012-02-01T23:59:59.000Z

10

Generation of a Parabolic Trough Collector Efficiency Curve from Separate Measurements of Outdoor Optical Efficiency and Indoor Receiver Heat Loss: Preprint  

DOE Green Energy (OSTI)

The overall efficiency of a parabolic trough collector is a function of both the fraction of direct normal radiation absorbed by the receiver (the optical efficiency) and the heat lost to the environment when the receiver is at operating temperature. The overall efficiency can be determined by testing the collector under actual operating conditions or by separately measuring these two components. This paper describes how outdoor measurement of the optical efficiency is combined with laboratory measurements of receiver heat loss to obtain an overall efficiency curve. Further, it presents a new way to plot efficiency that is more robust over a range of receiver operating temperatures.

Kutscher, C.; Burkholder, F.; Stynes, K.

2010-10-01T23:59:59.000Z

11

ARM - Datastreams - mwr3c  

NLE Websites -- All DOE Office Websites (Extended Search)

Datastreamsmwr3c Datastreamsmwr3c Documentation Data Quality Plots Citation DOI: 10.5439/1025248 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : MWR3C Microwave Radiometer, 3 Channel Active Dates 2011.01.11 - 2014.01.02 Measurement Categories Radiometric Originating Instrument Microwave Radiometer, 3 Channel (MWR3C) Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable Altitude above mean sea level m alt Azimuth deg azimuth ( time ) Base time in Epoch seconds since 1970-1-1 0:00:00 0:00 base_time Elevation deg elevation ( time ) Hail accumulation hit/cm^2 hail_accumulation ( time )

12

User's manual for DELSOL2: a computer code for calculating the optical performance and optimal system design for solar-thermal central-receiver plants  

DOE Green Energy (OSTI)

DELSOL2 is a revised and substantially extended version of the DELSOL computer program for calculating collector field performance and layout, and optimal system design for solar thermal central receiver plants. The code consists of a detailed model of the optical performance, a simpler model of the non-optical performance, an algorithm for field layout, and a searching algorithm to find the best system design. The latter two features are coupled to a cost model of central receiver components and an economic model for calculating energy costs. The code can handle flat, focused and/or canted heliostats, and external cylindrical, multi-aperture cavity, and flat plate receivers. The program optimizes the tower height, receiver size, field layout, heliostat spacings, and tower position at user specified power levels subject to flux limits on the receiver and land constraints for field layout. The advantages of speed and accuracy characteristic of Version I are maintained in DELSOL2.

Dellin, T.A.; Fish, M.J.; Yang, C.L.

1981-08-01T23:59:59.000Z

13

Solar Pilot Plant, Phase I. Preliminary design report. Volume II, Book 2. Central receiver optical model users manual. CDRL item 2. [HELIAKI code  

DOE Green Energy (OSTI)

HELIAKI is a FORTRAN computer program which simulates the optical/thermal performance of a central receiver solar thermal power plant for the dynamic conversion of solar-generated heat to electricity. The solar power plant which this program simulates consists of a field of individual sun tracking mirror units, or heliostats, redirecting sunlight into a cavity, called the receiver, mounted atop a tower. The program calculates the power retained by that cavity receiver at any point in time or the energy into the receiver over a year's time using a Monte Carlo ray trace technique to solve the multiple integral equations. An artist's concept of this plant is shown.

None

1977-05-01T23:59:59.000Z

14

Ceramic solar receivers  

DOE Green Energy (OSTI)

The application of ceramic materials to high temperature solar receivers for advanced Brayton and advanced Stirling thermal electric systems is discussed. Conceptual designs for ceramic cavity receivers employing impingement jet-cooled, dome-shaped silicon carbide heat exchanger modules are offered. Optical, mechanical, heat transfer and structural analyses of this novel receiver approach are presented.

Jarvinen, P. O.

1979-01-01T23:59:59.000Z

15

Optical  

NLE Websites -- All DOE Office Websites (Extended Search)

Optical Optical fiber-based single-shot picosecond transient absorption spectroscopy Andrew R. Cook a͒ and Yuzhen Shen Department of Chemistry, Brookhaven National Laboratory, Upton, New York 11973, USA ͑Received 27 January 2009; accepted 29 May 2009; published online 17 July 2009͒ A new type of single-shot transient absorption apparatus is described based on a bundle of optical fibers. The bundle contains 100 fibers of different lengths, each successively giving ϳ15 ps longer optical delay. Data are collected by imaging light from the exit of the bundle into a sample where it is overlapped with an electron pulse or laser excitation pulse, followed by imaging onto a charge coupled device ͑CCD͒ detector where the intensity of light from each fiber is measured simultaneously. Application to both ultrafast pump-probe spectroscopy and pulse radiolysis is demonstrated. For pulse

16

3C Holding AG | Open Energy Information  

Open Energy Info (EERE)

Holding AG Holding AG Jump to: navigation, search Name 3C Holding AG Place Bad Vilbel/Frankfurt am Main, Germany Zip 61118 Sector Services Product 3C Holding AG develops trading strategies for EU allowances, JI/CDM Projects and climate neutral events, products and services. Merged with Factor Consulting to form First Climate. References 3C Holding AG[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. 3C Holding AG is a company located in Bad Vilbel/Frankfurt am Main, Germany . References ↑ "3C Holding AG" Retrieved from "http://en.openei.org/w/index.php?title=3C_Holding_AG&oldid=341624" Categories: Clean Energy Organizations Companies Organizations Stubs

17

CALUTRON RECEIVER  

DOE Patents (OSTI)

An improved receiver and receiver mount for calutrons are described. The receiver can be manipulated from outside the tank by a single control to position it with respect to the beam. A door can be operated exteriorly also to prevent undesired portions of the beam from entering the receiver. The receiver has an improved pocket which is more selective in the ions collected. (T.R.H.)

Barnes, S.W.

1959-06-16T23:59:59.000Z

18

AOCS Official Method Cd 3c-91  

Science Conference Proceedings (OSTI)

Saponification Value Modified Method Using Methanol AOCS Official Method Cd 3c-91 Methods Methods and Analyses Analytical Chemistry Methods Downloads Methods Downloads DEFINITION The saponification value is the

19

AOCS Official Method Ca 3c-01  

Science Conference Proceedings (OSTI)

Detection of a Volatile Organic Contaminant by GC-MS AOCS Official Method Ca 3c-01 Methods Methods and Analyses Analytical Chemistry Methods Downloads Methods Downloads DEFINITION This method describes the dete

20

Laser warning receiver to identify the wavelength and angle of ...  

A laser warning receiver is disclosed which has up to hundreds of individual optical channels each optically oriented to receive laser light from a different angle of ...

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

High-temperature ceramic receivers  

DOE Green Energy (OSTI)

An advanced ceramic dome cavity receiver is discussed which heats pressurized gas to temperatures above 1800/sup 0/F (1000/sup 0/C) for use in solar Brayton power systems of the dispersed receiver/dish or central receiver type. Optical, heat transfer, structural, and ceramic material design aspects of the receiver are reported and the development and experimental demonstration of a high-temperature seal between the pressurized gas and the high-temperature silicon carbide dome material is described.

Jarvinen, P. O.

1980-01-01T23:59:59.000Z

22

Climate Zone 3C | Open Energy Information  

Open Energy Info (EERE)

C C Jump to: navigation, search A type of climate defined in the ASHRAE 169-2006 standard consisting of Climate Zone Number 3 and Climate Zone Subtype C. Climate Zone 3C is defined as Warm - Marine with IP Units CDD50ºF ≤ 4500 AND HDD65ºF ≤ 3600 and SI Units CDD10ºC ≤ 2500 AND HDD18ºC ≤ 2000 . The following places are categorized as class 3C climate zones: Alameda County, California Marin County, California Mendocino County, California Monterey County, California Napa County, California San Benito County, California San Francisco County, California San Luis Obispo County, California San Mateo County, California Santa Barbara County, California Santa Clara County, California Santa Cruz County, California Sonoma County, California Ventura County, California

23

Optics  

NLE Websites -- All DOE Office Websites (Extended Search)

Optics A computer program to calculate the optical properties of glazing systems and laminates. The program can be used to construct new laminates from existing components and...

24

Radiation receiver  

SciTech Connect

The apparatus for collecting radiant energy and converting same to alternate energy form includes a housing having an interior space and a radiation transparent window allowing, for example, solar radiation to be received in the interior space of the housing. Means are provided for passing a stream of fluid past said window and for injecting radiation absorbent particles in said fluid stream. The particles absorb the radiation and because of their very large surface area, quickly release the heat to the surrounding fluid stream. The fluid stream particle mixture is heated until the particles vaporize. The fluid stream is then allowed to expand in, for example, a gas turbine to produce mechanical energy. In an aspect of the present invention properly sized particles need not be vaporized prior to the entrance of the fluid stream into the turbine, as the particles will not damage the turbine blades. In yet another aspect of the invention, conventional fuel injectors are provided to inject fuel into the fluid stream to maintain the proper temperature and pressure of the fluid stream should the source of radiant energy be interrupted. In yet another aspect of the invention, an apparatus is provided which includes means for providing a hot fluid stream having hot particles disbursed therein which can radiate energy, means for providing a cooler fluid stream having cooler particles disbursed therein, which particles can absorb radiant energy and means for passing the hot fluid stream adjacent the cooler fluid stream to warm the cooler fluid and cooler particles by the radiation from the hot fluid and hot particles.

Hunt, Arlon J. (Oakland, CA)

1983-01-01T23:59:59.000Z

25

Radiation receiver  

DOE Patents (OSTI)

The apparatus for collecting radiant energy and converting same to alternate energy form includes a housing having an interior space and a radiation transparent window allowing, for example, solar radiation to be received in the interior space of the housing. Means are provided for passing a stream of fluid past said window and for injecting radiation absorbent particles in said fluid stream. The particles absorb the radiation and because of their very large surface area, quickly release the heat to the surrounding fluid stream. The fluid stream particle mixture is heated until the particles vaporize. The fluid stream is then allowed to expand in, for example, a gas turbine to produce mechanical energy. In an aspect of the present invention properly sized particles need not be vaporized prior to the entrance of the fluid stream into the turbine, as the particles will not damage the turbine blades. In yet another aspect of the invention, conventional fuel injectors are provided to inject fuel into the fluid stream to maintain the proper temperature and pressure of the fluid stream should the source of radiant energy be interrupted. In yet another aspect of the invention, an apparatus is provided which includes means for providing a hot fluid stream having hot particles disbursed therein which can radiate energy, means for providing a cooler fluid stream having cooler particles disbursed therein, which particles can absorb radiant energy and means for passing the hot fluid stream adjacent the cooler fluid stream to warm the cooler fluid and cooler particles by the radiation from the hot fluid and hot particles. 5 figs.

Hunt, A.J.

1983-09-13T23:59:59.000Z

26

STRUCTUREu DITERPENE ELUCIDATION FROM 1 3 C NMR  

E-Print Network (OSTI)

STRUCTUREu DITERPENE ELUCIDATION FROM 1 3 C NMR SPECTRA WITH INDUCTIVE LOGIC PROGRAMMING SASÏ O DZÏ Programming (ILP) to the problem of diterpene structure elucidation from 1 3 C NMR spectra. Diterpenes pharmaceutical e ectors. The interpretation of diterpene 1 3 C NMR spectra normally requires specialists

Dzeroski, Saso

27

Optical characterization of n=1.03 silica aerogel used as radiator in the RICH of E. Aschenauer 9 , N. Bianchi 4 , G.P. Capitani 4 , P. Carter 3 , C Casalino 2 , E. Cisbani 6 , C. Coluzza 7 , R. De Leo 2;a ,  

E-Print Network (OSTI)

Optical characterization of n=1.03 silica aerogel used as radiator in the RICH of HERMES E Abstract The optical properties of silica aerogel tiles with a refractive index of 1.03 and dimensions 11, is completely interpretable as backscattering from inside the aerogel, revealing an absence of light reflection

28

Characterization of Advanced Avalanche Photodiodes for Water Vapor Lidar Receivers  

Science Conference Proceedings (OSTI)

Development of advanced differential absorption lidar (DIAL) receivers is very important to increase the accuracy of atmospheric water vapor measurements. A major component of such receivers is the optical detector. In the near-infrared wavelength range ...

Refaat Tamer F.; Halama Gary E.; DeYoung Russell J.

2000-07-01T23:59:59.000Z

29

NREL: Concentrating Solar Power Research - Receiver R&D  

NLE Websites -- All DOE Office Websites (Extended Search)

used to analyze the steady-state, off-sun thermal losses of receivers used in solar parabolic trough power plants; helps to reduce collector optical losses and reduce receiver...

30

OPTICS5  

NLE Websites -- All DOE Office Websites (Extended Search)

Optics5 (5.1.02) Knowledge Base Optics5 (5.1.02) Knowledge Base Last Updated: 09/11/13 Table of Contents INSTALLATION EXECUTION bullet ** Operating Systems -- Microsoft Windows 7 and Vista ** bullet ** Running Optics5 with Microsoft Windows 7 and Vista ** bullet ** Running Optics5 with Microsoft Windows 7 and Vista 64 bit ** Optics5 may not work correctly with regional/locale settings using "," as a decimal separator. bullet Which Windows operating systems can be used to run Optics? "Class Does Not Support Automation or Expected Interface" error message bullet How much hard disk space should be available to install Optics? Optics user manual bullet I receive a virus warning (nimda-virus) when installing Optics. What should I do? NFRC Procedure for Applied Films bullet I have installed Optics but I can't find the program or the icon.

31

3C 216: A Powerful FRII Seyfert 1 Galaxy  

E-Print Network (OSTI)

3C 216 has a weak accretion flow luminosity, well below the Seyfert1/QSO dividing line, weak broad emission lines (BELs) and powerful radio lobes. As a consequence of the extreme properties of 3C 216, it is the most convincing example known of an FR II radio source that is kinetically dominated: the jet kinetic luminosity, $Q$, is larger than the total thermal luminosity (IR to X-ray) of the accretion flow, $L_{bol}$. Using three independent estimators for the central black hole mass, we find that the jet in 3C 216 is very super-Eddington, $3.3 L_{Edd}1$, either presently or in the past based on the rarity of $L_{bol}>L_{Edd}$ quasars. The existence of $R(t)>1$ AGN is a strong constraint on the theory of the central engine of FRII radio sources.

Brian Punsly

2006-09-07T23:59:59.000Z

32

X-Ray Sources Overdensity Around 3C 295  

E-Print Network (OSTI)

We present a statistical analysis of the Chandra observation of the source field around the 3C 295 galaxy cluster ($z=0.46$). Three different methods of analysis, namely a chip by chip logN-logS, a two dimentional Kolmogorov-Smirnov (KS) test, and the angular correlation function (ACF) show a strong overdensity of sources in the North-East of the field, that may indicate a filament of the large scale structure of the Universe toward 3C 295.

V. D'Elia; F. Fiore; M. Elvis; M. Cappi; S. Mathur; P. Mazzotta; E. Falco

2003-10-17T23:59:59.000Z

33

Solar heat receiver  

DOE Patents (OSTI)

A receiver for converting solar energy to heat a gas to temperatures from 700.degree.-900.degree. C. The receiver is formed to minimize impingement of radiation on the walls and to provide maximum heating at and near the entry of the gas exit. Also, the receiver is formed to provide controlled movement of the gas to be heated to minimize wall temperatures. The receiver is designed for use with gas containing fine heat absorbing particles, such as carbon particles.

Hunt, Arlon J. (Oakland, CA); Hansen, Leif J. (Berkeley, CA); Evans, David B. (Orinda, CA)

1985-01-01T23:59:59.000Z

34

Solar heat receiver  

DOE Patents (OSTI)

A receiver is described for converting solar energy to heat a gas to temperatures from 700 to 900/sup 0/C. The receiver is formed to minimize impingement of radiation on the walls and to provide maximum heating at and near the entry of the gas exit. Also, the receiver is formed to provide controlled movement of the gas to be heated to minimize wall temperatures. The receiver is designed for use with gas containing fine heat absorbing particles, such as carbon particles.

Hunt, A.J.; Hansen, L.J.; Evans, D.B.

1982-09-29T23:59:59.000Z

35

Microwave Radiometer 3 Channel (MWR3C) Handbook  

SciTech Connect

The microwave radiometer 3-channel (MWR3C) provides time-series measurements of brightness temperatures from three channels centered at 23.834, 30, and 89 GHz. These three channels are sensitive to the presence of liquid water and precipitable water vapor.

Cadeddu, MP

2012-05-04T23:59:59.000Z

36

Stage 3c: Developing and Assessing Low Emissions Development Scenarios |  

Open Energy Info (EERE)

Stage 3c: Developing and Assessing Low Emissions Development Scenarios Stage 3c: Developing and Assessing Low Emissions Development Scenarios Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other

37

NETL Researchers Receive  

NLE Websites -- All DOE Office Websites (Extended Search)

1, Issue 20 1, Issue 20 the lab NETL Researchers Receive 2010 R&D 100 Awards page 2 NETL Employees Receive USGS Director's Award for Exemplary Service to the Nation page 3 Exciting New Raman Gas Sensor System page 5 NETLOG is a quarterly newsletter, which highlights recent achievements and ongoing research at NETL. Any comments or suggestions, please contact Paula Turner at paula.turner@netl.doe.gov or call 541-967-5966. R&D 100 award recipients Paul Jablonski and David Alman at the black tie ceremony on November 11 in Orlando. CONTENTS NETL Researchers Receive 2010 R&D 100 Awards _______ 2 NETL Employees Receive USGS Director's Award for Exemplary Service to the Nation _____________________ 3 NETL Develops Smart Drilling Fluids ____________________

38

Shipping and Receiving  

NLE Websites -- All DOE Office Websites (Extended Search)

Shipping and Receiving Print Shipping and Receiving Print On this page: Transport Policy Shipping to the ALS Shipping from the ALS Shipping Hazardous Materials Contacts: ALS Shipping & Receiving (small packages) LBNL Shipping & Receiving (large packages requiring forklift truck) Building 7 Hours: M-F, 7:30 am-4:30 pm Telephone: 510 486 4494 Building 69 Hours: M-F, 7:00 am-3:30 pm Telephone: 510 486 4935 Fax: 510 486 5668 Transport Policy - Getting Your Samples and Equipment to and from the ALS All Lab personnel, including ALS staff and users, must follow the procedures detailed below for packing, labeling, and sending shipments to or from the ALS. These shipping procedures are required for: all materials and equipment brought to the ALS; items that are being returned for repairs or refunds to

39

Solar energy receiver  

DOE Patents (OSTI)

An improved long-life design for solar energy receivers provides for greatly reduced thermally induced stress and permits the utilization of less expensive heat exchanger materials while maintaining receiver efficiencies in excess of 85% without undue expenditure of energy to circulate the working fluid. In one embodiment, the flow index for the receiver is first set as close as practical to a value such that the Graetz number yields the optimal heat transfer coefficient per unit of pumping energy, in this case, 6. The convective index for the receiver is then set as closely as practical to two times the flow index so as to obtain optimal efficiency per unit mass of material.

Schwartz, Jacob (Arlington, MA)

1978-01-01T23:59:59.000Z

40

Lab receives OPCW recertification  

NLE Websites -- All DOE Office Websites (Extended Search)

Vu, and Audrey Williams. In 2011, LLNL, as well as the laboratories from Spain and Poland, received "C" grades that weren't based on technical issues, but were mainly based on...

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Central solar energy receiver  

DOE Patents (OSTI)

An improved tower-mounted central solar energy receiver for heating air drawn through the receiver by an induced draft fan. A number of vertically oriented, energy absorbing, fin-shaped slats are radially arranged in a number of concentric cylindrical arrays on top of the tower coaxially surrounding a pipe having air holes through which the fan draws air which is heated by the slats which receive the solar radiation from a heliostat field. A number of vertically oriented and wedge-shaped columns are radially arranged in a number of concentric cylindrical clusters surrounding the slat arrays. The columns have two mirror-reflecting sides to reflect radiation into the slat arrays and one energy absorbing side to reduce reradiation and reflection from the slat arrays.

Drost, M. Kevin (Richland, WA)

1983-01-01T23:59:59.000Z

42

Multichannel homodyne receiver  

DOE Patents (OSTI)

A homodyne radar transmitter/receiver device which produces a single combined output which contains modulated backscatter information for all phase conditions of both modulated and unmodulated backscatter signals is described. The device utilizes taps along coaxial transmission lines, strip transmission line, and waveguides which are spaced by 1/8 wavelength or 1/6 wavelength, etc. This greatly reduces costs by eliminating separate transmission and reception antennas and an expensive arrangement of power splitters and mixers utilized in the prior art.

Landt, J.A.

1981-01-19T23:59:59.000Z

43

Multichannel homodyne receiver  

DOE Patents (OSTI)

A homodyne radar transmitter/receiver device which produces a single combined output which contains modulated backscatter information for all phase conditions of both modulated and unmodulated backscatter signals. The device utilizes taps along coaxial transmission lines, strip transmission line, and waveguides which are spaced by 1/8 wavelength or 1/6 wavelength, etc. This greatly reduces costs by eliminating separate transmission and reception antennas and an expensive arrangement of power splitters and mixers utilized in the prior art.

Landt, Jeremy A. (Los Alamos, NM)

1982-01-01T23:59:59.000Z

44

Quantum receivers with squeezing and photon-number-resolving detectors  

E-Print Network (OSTI)

We propose quantum receivers with optical squeezing and photon-number-resolving detector (PNRD) for the near-optimal discrimination of quaternary phase-shift-keyed coherent state signals. The basic scheme is similar to the previous proposals (e.g. Phys. Rev. A 84, 042328 (2012)) in which displacement operations, on-off detectors, and electrical feedforward operations were used. Here we study two types of receivers where one installs optical squeezings and the other uses PNRDs instead of on-off detectors. We show that both receivers can attain lower error rates than that by the previous scheme and in particular, the PNRD based receiver has a significant gain under the fixed number of feedfoward steps. Moreover, we show that the PNRD based receiver can suppress the errors due to dark counts, which is not possible by the on-off detector based receiver with a limited number of feedforwards.

Shuro Izumi; Masahiro Takeoka; Kazuhiro Ema; Masahide Sasaki

2013-02-12T23:59:59.000Z

45

Compound parabolic concentrators for narrowband wireless infrared receivers  

E-Print Network (OSTI)

Compound parabolic concentrators for narrowband wireless infrared receivers Keang-Po Ho Joseph M and hollow compound parabolic concentrators (CPCs), for use in free-space infrared communication receivers terms: compound parabolic concentrators (CPCs); optical bandpass fil- ters; Monte Carlo ray tracing

Kahn, Joseph M.

46

Development of a solar thermal receiver for high temperature applications  

DOE Green Energy (OSTI)

A thermal receiver for point focus collectors is being constructed. Its design, which is based upon experience with a commercial receiver, employs the advantages of that receiver and improves some of its features. The new receiver uses as a buffer between the cavity surface and the heat transfer fluid a thermal mass, which with a very small temperature drop penalty smooths the flux distribution to eliminate hot spots. Maximum operating temperature range was extended from 620/sup 0/C to 870/sup 0/C and receiver efficiency was improved. The design of the receiver enables significant spillage flux at the receiver to be used. Thus, lower quality optics can be employed in applications not requiring very high temperatures. Design and construction features of the receiver are presented and the testing program is described.

Bohn, M.; Bessler, G.

1979-11-01T23:59:59.000Z

47

Liquid cooled, linear focus solar cell receiver  

DOE Patents (OSTI)

Separate structures for electrical insulation and thermal conduction are established within a liquid cooled, linear focus solar cell receiver for use with parabolic or Fresnel optical concentrators. The receiver includes a V-shaped aluminum extrusion having a pair of outer faces each formed with a channel receiving a string of solar cells in thermal contact with the extrusion. Each cell string is attached to a continuous glass cover secured within the channel with spring clips to isolate the string from the external environment. Repair or replacement of solar cells is effected simply by detaching the spring clips to remove the cover/cell assembly without interrupting circulation of coolant fluid through the receiver. The lower surface of the channel in thermal contact with the cells of the string is anodized to establish a suitable standoff voltage capability between the cells and the extrusion. Primary electrical insulation is provided by a dielectric tape disposed between the coolant tube and extrusion. Adjacent solar cells are soldered to interconnect members designed to accommodate thermal expansion and mismatches. The coolant tube is clamped into the extrusion channel with a releasably attachable clamping strip to facilitate easy removal of the receiver from the coolant circuit.

Kirpich, A.S.

1983-12-08T23:59:59.000Z

48

Liquid cooled, linear focus solar cell receiver  

DOE Patents (OSTI)

Separate structures for electrical insulation and thermal conduction are established within a liquid cooled, linear focus solar cell receiver for use with parabolic or Fresnel optical concentrators. The receiver includes a V-shaped aluminum extrusion having a pair of outer faces each formed with a channel receiving a string of solar cells in thermal contact with the extrusion. Each cell string is attached to a continuous glass cover secured within the channel with spring clips to isolate the string from the external environment. Repair or replacement of solar cells is effected simply by detaching the spring clips to remove the cover/cell assembly without interrupting circulation of coolant fluid through the receiver. The lower surface of the channel in thermal contact with the cells of the string is anodized to establish a suitable standoff voltage capability between the cells and the extrusion. Primary electrical insulation is provided by a dielectric tape disposed between the coolant tube and extrusion. Adjacent solar cells are soldered to interconnect members designed to accommodate thermal expansion and mismatches. The coolant tube is clamped into the extrusion channel with a releasably attachable clamping strip to facilitate easy removal of the receiver from the coolant circuit.

Kirpich, Aaron S. (Broomall, PA)

1985-01-01T23:59:59.000Z

49

MULTI-EPOCH OBSERVATIONS OF THE RED WING EXCESS IN THE SPECTRUM OF 3C 279  

SciTech Connect

It has been previously determined that there is a highly significant correlation between the spectral index from 10 GHz to 1350 A and the amount of excess luminosity in the red wing of quasar C IV {lambda}1549 broad emission lines (BELs). Ostensibly, the prominence of the red excess is associated with the radio jet emission mechanism and is most pronounced for lines of sight close to the jet axis. Studying the scant significant differences in the UV spectra of radio-loud and radio-quiet quasars might provide vital clues to the origin of the unknown process that creates powerful relativistic jets that appear in only about 10% of quasars. In this study, the phenomenon is explored with multi-epoch observations of the Mg II {lambda}2798 broad line in 3C 279 which has one of the largest known red wing excesses in a quasar spectrum. The amount of excess that is detected appears to be independent of all directly observed optical continuum, radio, or submillimeter properties (fluxes or polarizations). The only trend that occurs in this sparse data is: the stronger the BEL, the larger the fraction of flux that resides in the red wing. It is concluded that more monitoring is needed and spectropolarimetry with a large telescope is essential during low states to understand more.

Punsly, Brian, E-mail: brian.punsly@verizon.net, E-mail: brian.punsly@comdev-usa.com [1415 Granvia Altamira, Palos Verdes Estates, CA 90274 (United States); ICRANet, Piazza della Repubblica 10, I-65100 Pescara (Italy)

2013-01-10T23:59:59.000Z

50

Multi-Epoch Observations of the Redwing Excess in the Spectrum of 3C279  

E-Print Network (OSTI)

It has been previously determined that there is a highly significant correlation between the spectral index from 10 GHz to 1350 $\\AA$ and the amount of excess luminosity in the red wing of quasar CIV $\\lambda$1549 broad emission lines (BELs). Ostensibly, the prominence of the red excess is associated with the radio jet emission mechanism and is most pronounced for lines of sight close to the jet axis. Studying the scant significant differences in the UV spectra of radio loud and radio quiet quasars might provide vital clues to the origin of the unknown process that creates powerful relativistic jets that appear in only about ten percent of quasars. In this study, the phenomenon is explored with multi-epoch observations of the MgII $\\lambda$2798 broad line in 3C 279 which has one of the largest known redwing excesses in a quasar spectrum. The amount of excess that is detected appears to be independent of all directly observed optical continuum, radio or submm properties (fluxes or polarizations). The only tren...

Punsly, Brian

2012-01-01T23:59:59.000Z

51

Chandra Discovery of an X-ray Jet and Lobes in 3C 15  

E-Print Network (OSTI)

We report the Chandra detection of an X-ray jet in 3C 15. The peak of the X-ray emission in the jet is 4.1'' (a projected distance of 5.1 kpc) from the nucleus, and coincident with a component previously identified in the radio and optical jets. We examine four models for the X-ray jet emission: (I) weak synchrotron cooling in equip., (II) moderate synchrotron cooling in equip., (III) weak synchrotron plus SSC cooling, and (IV) moderate synchrotron plus SSC cooling. We argue that case (II) can most reasonably explain the overall emission from knot C. Case (III) is also possible, but requires a large departure from equipartition and for the jet power to be comparable to that of the brightest quasars. Diffuse X-ray emission has also been detected, distributed widely over the full extent (63kpc x 25kpc) of the radio lobes. We compare the total energy contained in the lobes with the jet power estimated from knot C, and discuss the energetic link between the jet and the lobes. We argue that the fueling time (t_fue...

Kataoka, J; Edwards, P G; Kino, M; Takahara, F; Serino, Y; Kawai, N; Martel, A R

2003-01-01T23:59:59.000Z

52

Data:B54b21de-3c63-405a-9ea9-f152c09b3c13 | Open Energy Information  

Open Energy Info (EERE)

b21de-3c63-405a-9ea9-f152c09b3c13 b21de-3c63-405a-9ea9-f152c09b3c13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Residential Sector: Residential Description: "applies only to electric service to a single-family dwelling and its appurtenances, where the major use of electricity is for domestic purposes such as lighting, household appliances, and the personal comfort and convenience of those residing therein..." Source or reference: http://www.rockwoodelectric.com/rates.asp

53

WIPP Receives Top Safety Award  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP Receives Top Safety Award CARLSBAD, N.M., November 10, 2011 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top accolades from New...

54

Solar central receiver heliostat reflector assembly  

SciTech Connect

A heliostat reflector assembly for a solar central receiver system comprises a light-weight, readily assemblable frame which supports a sheet of stretchable reflective material and includes mechanism for selectively applying tension to and positioning the sheet to stretch it to optical flatness. The frame is mounted on and supported by a pipe pedestal assembly that, in turn, is installed in the ground. The frame is controllably driven in a predetermined way by a light-weight drive system so as to be angularly adjustable in both elevation and azimuth to track the sun and efficiently continuously reflect the sun's rays to a focal zone, i.e. central receiver, which forms part of a solar energy utilization system, such as a solar energy fueled electrical power generation system. The frame may include a built-in system for testing for optical flatness of the reflector. The preferable geometric configuration of the reflector is octagonal; however, it may be other shapes, such as hexagonal, pentagonal or square. Several different embodiments of means for tensioning and positioning the reflector to achieve optical flatness are disclosed. The reflector assembly is based on the stretch frame concept which provides an extremely light-weight, simple, low-cost reflector assembly that may be driven for positioning and tracking by a light-weight, inexpensive drive system.

Horton, Richard H. (Schenectady, NY); Zdeb, John J. (Clifton Park, NY)

1980-01-01T23:59:59.000Z

55

V-010: 3Com, HP, and H3C Switches SNMP Configuration Lets Remote Users Take  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: 3Com, HP, and H3C Switches SNMP Configuration Lets Remote 10: 3Com, HP, and H3C Switches SNMP Configuration Lets Remote Users Take Administrative Actions V-010: 3Com, HP, and H3C Switches SNMP Configuration Lets Remote Users Take Administrative Actions October 25, 2012 - 6:00am Addthis PROBLEM: 3Com, HP, and H3C Switches SNMP Configuration Lets Remote Users Take Administrative Actions PLATFORM: 3COM, and H3C Routers & Switches Specific products and model numbers is provided in the vendor's advisory. ABSTRACT: A vulnerability was reported in 3Com, HP, and H3C Switches. REFERENCE LINKS: HP Support document ID: c03515685 SecurityTracker Alert ID: 1027694 CVE-2012-3268 IMPACT ASSESSMENT: High DISCUSSION: A remote user with knowledge of the SNMP public community string can access potentially sensitive data (e.g., user names, passwords) in the

56

Ceramic dome receiver technology developments  

DOE Green Energy (OSTI)

The development and experimental demonstration of a high-temperature seal for the SHARE ceramic dome cavity receiver is reported. The mechanical contact seal which was tested on one-foot-diameter silicon-carbide ceramic-dome hardware at pressure differentials to four atmospheres and dome temperatures to 2200/sup 0/F (1200/sup 0/C) showed negligible leakage at expected receiver operating conditions. Potential solar receiver applications for the technology are illustrated.

Jarvinen, P. O.

1980-01-01T23:59:59.000Z

57

Desjarlais received Lifetime Achievement Award  

NLE Websites -- All DOE Office Websites (Extended Search)

Andr Desjarlais received a Lifetime Achievement Award from the Polyisocyanurate Insulation Manufacturers Association (PIMA) during the group's 25th Anniversary celebration...

58

MULTIWAVELENGTH VARIATIONS OF 3C 454.3 DURING THE 2010 NOVEMBER TO 2011 JANUARY OUTBURST  

SciTech Connect

We present multiwavelength data of the blazar 3C 454.3 obtained during an extremely bright outburst from 2010 November through 2011 January. These include flux density measurements with the Herschel Space Observatory at five submillimeter-wave and far-infrared bands, the Fermi Large Area Telescope at {gamma}-ray energies, Swift at X-ray, ultraviolet (UV), and optical frequencies, and the Submillimeter Array at 1.3 mm. From this data set, we form a series of 52 spectral energy distributions (SEDs) spanning nearly two months that are unprecedented in time coverage and breadth of frequency. Discrete correlation analysis of the millimeter, far-infrared, and {gamma}-ray light curves show that the variations were essentially simultaneous, indicative of cospatiality of the emission, at these wavebands. In contrast, differences in short-term fluctuations at various wavelengths imply the presence of inhomogeneities in physical conditions across the source. We locate the site of the outburst in the parsec-scale 'core', whose flux density as measured on 7 mm Very Long Baseline Array images increased by 70% during the first five weeks of the outburst. Based on these considerations and guided by the SEDs, we propose a model in which turbulent plasma crosses a conical standing shock in the parsec-scale region of the jet. Here, the high-energy emission in the model is produced by inverse Compton scattering of seed photons supplied by either nonthermal radiation from a Mach disk, thermal emission from hot dust, or (for X-rays) synchrotron radiation from plasma that crosses the standing shock. For the two dates on which we fitted the model SED to the data, the model corresponds very well to the observations at all bands except at X-ray energies, where the spectrum is flatter than observed.

Wehrle, Ann E. [Space Science Institute, 4750 Walnut Street, Suite 205, Boulder, CO 80301 (United States); Marscher, Alan P.; Jorstad, Svetlana G.; Joshi, Manasvita; MacDonald, Nicholas R.; Williamson, Karen E.; Agudo, Ivan [Department of Astronomy, Boston University, 725 Commonwealth Avenue, Boston, MA 02215 (United States); Gurwell, Mark A. [Harvard-Smithsonian Center for Astrophysics, MS 42, 60 Garden Street, Cambridge, MA 02138 (United States); Grupe, Dirk, E-mail: awehrle@spacescience.org [Department of Astronomy and Astrophysics, Pennsylvania State University, 525 Davey Lab, University Park, PA 16802 (United States)

2012-10-20T23:59:59.000Z

59

Chandra Discovery of an X-ray Jet and Lobes in 3C 15  

E-Print Network (OSTI)

We report the Chandra detection of an X-ray jet in 3C 15. The peak of the X-ray emission in the jet is 4.1'' (a projected distance of 5.1 kpc) from the nucleus, and coincident with a component previously identified in the radio and optical jets. We examine four models for the X-ray jet emission: (I) weak synchrotron cooling in equip., (II) moderate synchrotron cooling in equip., (III) weak synchrotron plus SSC cooling, and (IV) moderate synchrotron plus SSC cooling. We argue that case (II) can most reasonably explain the overall emission from knot C. Case (III) is also possible, but requires a large departure from equipartition and for the jet power to be comparable to that of the brightest quasars. Diffuse X-ray emission has also been detected, distributed widely over the full extent (63kpc x 25kpc) of the radio lobes. We compare the total energy contained in the lobes with the jet power estimated from knot C, and discuss the energetic link between the jet and the lobes. We argue that the fueling time (t_fuel) and the source age (t_src) are comparable for case (II), whereas t_fuel thermal galaxy halo and non-thermal relativistic electrons in the radio lobes. Finally, we show that the X-ray emission from the nucleus is not adequately fitted by a simple absorbed power-law model, but needs an additional power-law with heavy absorption intrinsic to the source. Such a high column density is consistent with the presence of a dense, dusty torus which obscures the quasar nucleus.

J. Kataoka; J. P. Leahy; P. G. Edwards; M. Kino; F. Takahara; Y. Serino; N. Kawai; A. R. Martel

2003-08-12T23:59:59.000Z

60

SHEAR WAVE SEISMIC STUDY COMPARING 9C3D SV AND SH IMAGES WITH 3C3D C-WAVE IMAGES  

Science Conference Proceedings (OSTI)

The objective of this study was to compare the relative merits of shear-wave (S-wave) seismic data acquired with nine-component (9-C) technology and with three-component (3-C) technology. The original proposal was written as if the investigation would be restricted to a single 9-C seismic survey in southwest Kansas (the Ashland survey), on the basis of the assumption that both 9-C and 3-C S-wave images could be created from that one data set. The Ashland survey was designed as a 9-C seismic program. We found that although the acquisition geometry was adequate for 9-C data analysis, the source-receiver geometry did not allow 3-C data to be extracted on an equitable and competitive basis with 9-C data. To do a fair assessment of the relative value of 9-C and 3-C seismic S-wave data, we expanded the study beyond the Ashland survey and included multicomponent seismic data from surveys done in a variety of basins. These additional data were made available through the Bureau of Economic Geology, our research subcontractor. Bureau scientists have added theoretical analyses to this report that provide valuable insights into several key distinctions between 9-C and 3-C seismic data. These theoretical considerations about distinctions between 3-C and 9-C S-wave data are presented first, followed by a discussion of differences between processing 9-C common-midpoint data and 3-C common-conversion-point data. Examples of 9-C and 3-C data are illustrated and discussed in the last part of the report. The key findings of this study are that each S-wave mode (SH-SH, SV-SV, or PSV) involves a different subsurface illumination pattern and a different reflectivity behavior and that each mode senses a different Earth fabric along its propagation path because of the unique orientation of its particle-displacement vector. As a result of the distinct orientation of each mode's particle-displacement vector, one mode may react to a critical geologic condition in a more optimal way than do the other modes. A conclusion of the study is that 9-C seismic data contain more rock and fluid information and more sequence and facies information than do 3-C seismic data; 9-C data should therefore be acquired in multicomponent seismic programs whenever possible.

John Beecherl; Bob A. Hardage

2004-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:34702ed8-2f91-4f3c-af4a-a423d3c483ad | Open Energy Information  

Open Energy Info (EERE)

ed8-2f91-4f3c-af4a-a423d3c483ad ed8-2f91-4f3c-af4a-a423d3c483ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/04/01 End date if known: Rate name: Large Power (C-1) Sector: Commercial Description: Source or reference: http://www.wheatbelt.com/uploaded/pdf/13572235352013RSC-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

62

Data:Fd677d3c-5c3c-4a0c-a499-9eac124aadbc | Open Energy Information  

Open Energy Info (EERE)

d3c-5c3c-4a0c-a499-9eac124aadbc d3c-5c3c-4a0c-a499-9eac124aadbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: RIDER TO SCHEDULE LIPS Sector: Industrial Description: This Rider Schedule is applicable, subject to the terms and conditions hereinafter set forth, to additional service in conjunction with Firm Power Service to Customer under Rate Schedule LIPS, when prearrangement has been made for the installation of facilities of adequate capacity and suitable phase and voltage adjacent to the premises to be served. All service is supplied at one location and at the voltage prescribed in Rate Schedule LIPS so as to permit delivery and metering of the total service at a single point of delivery and by a single metering installation

63

Data:4f8c086e-5380-4b3c-9de8-d3c40bec473c | Open Energy Information  

Open Energy Info (EERE)

e-5380-4b3c-9de8-d3c40bec473c e-5380-4b3c-9de8-d3c40bec473c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

64

Data:E91145e4-aad5-41d0-98ba-b697d3c3c52a | Open Energy Information  

Open Energy Info (EERE)

aad5-41d0-98ba-b697d3c3c52a aad5-41d0-98ba-b697d3c3c52a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2008/09/30 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

65

Data:6424cc68-aa3c-42aa-ad29-b80ed6e62e3c | Open Energy Information  

Open Energy Info (EERE)

8-aa3c-42aa-ad29-b80ed6e62e3c 8-aa3c-42aa-ad29-b80ed6e62e3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering & Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

66

Fe Emission And Ionized Excess Absorption in the Luminous Quasar 3C109 With XMM-Newton  

Science Conference Proceedings (OSTI)

We report results from an XMM-Newton observation of the broad-line radio galaxy 3C 109 (z=0.3056). Previous ASCA data revealed the presence of a broad iron line from the accretion disc with which the XMM-Newton spectrum is fully consistent. However, although improving the ASCA constraints on the line parameters, the quality of the data is not high enough to distinguish between an untruncated accretion disc extending down to small radii close to the black hole and a scenario in which the innermost 20-30 gravitational radii are missing. For this reason, our results are model-dependent and the hard data can be modeled equally well by considering an absorption scenario in which a large column of neutral gas partially covers the X-ray continuum source. However, the absorber would have to comprise hundreds/thousands very compact clouds close to the X-ray source, which seems rather extreme a requirement. The 2-10 keV intrinsic luminosity of 3C 109 is of the order of 2-3 x 10{sup 45} erg s{sup -1} regardless of the adopted model. A recent black hole mass estimate of {approx} 2 x 10{sup 8} M{sub {circle_dot}} implies that L{sub bol}/L{sub Edd} > 1. If partial covering is excluded, the observed reflection fraction (of the order of unity), steep photon index (1.86), and Fe line equivalent width (about 100 eV) all suggest to exclude that the X-ray continuum is strongly beamed indicating that the large Eddington ratio is associated with a radiatively efficient accretion process and making it unlikely that the innermost accretion disc is replaced by a thick radiatively inefficient medium such as in advection-dominated accretion models. We also confirm previous findings on the detection of low energy absorption in excess of the Galactic value, where we find excellent agreement with previous results obtained in X-rays and at other wavelengths (optical and infrared). The better quality of the XMM-Newton data enables us to attribute the excess absorption to slightly ionized gas in the line of sight, located at the redshift of 3C 109. The most likely interpretation for the excess absorption is that the line-of-sight is grazing the obscuring torus of unified models, which is consistent with the inclination inferred from the Fe line profile (about 40{sup o}) and with the hybrid radio-galaxy/quasar nature of 3C 109.

Miniutti, Giovanni; /Cambridge U., Inst. of Astron.; Ballantyne, D.R.; /Arizona U.; Allen, S.W.; /KIPAC, Menlo Park; Fabian, A.C.; /Cambridge U., Inst. of Astron.; Ross, R.R.; /Holy Cross Coll.

2006-06-09T23:59:59.000Z

67

Archive Reference Buildings by Climate Zone: 3C San Francisco, California |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C San Francisco, C San Francisco, California Archive Reference Buildings by Climate Zone: 3C San Francisco, California Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is available for reference. Current versions are also available. You can download ZIP files that contain the following: An EnergyPlus software input file (.idf) An html file showing the results from the EnergyPlus simulation (.html) A spreadsheet that summarizes the inputs and results for each location (.xls) The EnergyPlus TMY2 weather file (.epw). benchmark-v1.0_3.0-3c_ca_san_francisco.zip benchmark-v1.1_3.1-3c_usa_ca_san_francisco.zip benchmark-new-v1.2_4.0-3c_usa_ca_san_francisco.zip

68

Spare parts list for B83-0, Type 3C, Issue G  

SciTech Connect

This report is a table listing spare parts for the B83-0 type 3C. An explanation for information in each column is given. This issue supersedes Issue F, dated March 22, 1985.

1987-02-25T23:59:59.000Z

69

Table 8.3c Useful Thermal Output at Combined-Heat-and-Power ...  

U.S. Energy Information Administration (EIA)

Table 8.3c Useful Thermal Output at Combined-Heat-and-Power Plants: Commercial and Industrial Sectors, 1989-2011 (Subset of Table 8.3a; Trillion ...

70

CBFO Manager Receives ESGR Award  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 For Immediate Release CBFO Manager Receives ESGR Honor...

71

Support and maneuvering apparatus for solar energy receivers  

DOE Patents (OSTI)

A support and maneuvering apparatus is disclosed for a solar energy receiving device adpated for receiving and concentrating solar energy and having a central axis extending through the center thereof. The apparatus includes a frame for mounting the perimeter of said solar energy receiving device. A support member extends along the central axis of the receiving device and has a base end passing through the center of the receiving device and an outer distal end adapted for carrying a solar energy receiving and conversion mechanism. A variable tension mechanism interconnects the support member with the frame to provide stiffening for the support member and the frame and to assist in the alignment of the frame to optimize the optical efficiency of the solar energy receiving device. A rotatable base is provided, and connecting members extend from the base for pivotable attachment to the frame at spaced positions therealong. Finally, an elevation assembly is connected to the receiving device for selectively pivoting the receiving device about an axis defined between the attachment positions of the connecting members on the frame.

Murphy, Lawrence M. (Littleton, CO)

1989-01-01T23:59:59.000Z

72

Support and maneuvering apparatus for solar energy receivers  

DOE Patents (OSTI)

A support and maneuvering apparatus is disclosed for a solar energy receiving device adapted for receiving and concentrating solar energy and having a central axis extending through the center thereof. The apparatus includes a frame for mounting the perimeter of said solar energy receiving device. A support member extends along the central axis of the receiving device and has a base end passing through the center of the receiving device and an outer distal end adapted for carrying a solar energy receiving and conversion mechanism. A variable tension mechanism interconnects the support member with the frame to provide stiffening for the support member and the frame and to assist in the alignment of the frame to optimize the optical efficiency of the solar energy receiving device. A rotatable base is provided, and connecting members extend from the base for pivotable attachment to the frame at spaced positions therealong. Finally, an elevation assembly is connected to the receiving device for selectively pivoting the receiving about an axis defined between the attachment positions of the connecting members on the frame. 4 figs.

Murphy, L.M.

1988-07-28T23:59:59.000Z

73

Spatial optic multiplexer/diplexer  

DOE Patents (OSTI)

An apparatus for simultaneous transmission of optic signals having different wavelengths over a single optic fiber. Multiple light signals are transmitted through optic fibers that are formed into a circumference surrounding a central core fiber. The multiple light signals are directed by a lens into a single receiving fiber where the light combines and is then focused into the central core fiber which transmits the light to a wavelength discriminating receiver assembly.

Tremblay, Paul L. (Idaho Falls, ID)

1991-01-01T23:59:59.000Z

74

Data:3c461b87-cdf8-4a2c-afbe-0021e556ef3c | Open Energy Information  

Open Energy Info (EERE)

c461b87-cdf8-4a2c-afbe-0021e556ef3c c461b87-cdf8-4a2c-afbe-0021e556ef3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Schuyler, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Irrigation Service- No Control (Less than 10 Hp) Sector: Commercial Description: The irrigation season is generally seven months, between March 15 and October 14. The Department of Utilities may disconnect the transformers between October 15 and March 14 to reduce power loss. At locations where the Department has provided facilities for irrigation service, the Customer may use the

75

Data:1189a3c9-6707-4a3c-88f1-d325851b41eb | Open Energy Information  

Open Energy Info (EERE)

c9-6707-4a3c-88f1-d325851b41eb c9-6707-4a3c-88f1-d325851b41eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Bethel, Ohio (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Commercial- Three Phase Sector: Commercial Description: Source or reference: Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

76

Data:Fca538e1-3c96-4cbe-b125-478880b00922 | Open Energy Information  

Open Energy Info (EERE)

Fca538e1-3c96-4cbe-b125-478880b00922 Fca538e1-3c96-4cbe-b125-478880b00922 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/11/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 150 watt High Pressure Sodium Flood or Metal Halide Sector: Description: Availability A member must be receiving electric service to be eligible for a security light at that location. Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup.

77

Central solar-energy receiver  

DOE Patents (OSTI)

An improved tower-mounted central solar energy receiver for heating air drawn through the receiver by an induced draft fan is described. A number of vertically oriented, energy absorbing, fin-shaped slats are radially arranged in a number of concentric cylindrical arrays on top of the tower coaxially surrounding a pipe having air holes through which the fan draws air which is heated by the slats which receive the solar radiation from a heliostat field. A number of vertically oriented and wedge-shaped columns are radially arranged in a number of concentric cylindrical clusters surrounding the slat arrays. The columns have two mirror-reflecting sides to reflect radiation into the slat arrays and one energy absorbing side to reduce reradiation and reflection from the slat arrays.

Not Available

1981-10-27T23:59:59.000Z

78

UWB communication receiver feedback loop  

DOE Patents (OSTI)

A novel technique and structure that maximizes the extraction of information from reference pulses for UWB-TR receivers is introduced. The scheme efficiently processes an incoming signal to suppress different types of UWB as well as non-UWB interference prior to signal detection. Such a method and system adds a feedback loop mechanism to enhance the signal-to-noise ratio of reference pulses in a conventional TR receiver. Moreover, sampling the second order statistical function such as, for example, the autocorrelation function (ACF) of the received signal and matching it to the ACF samples of the original pulses for each transmitted bit provides a more robust UWB communications method and system in the presence of channel distortions.

Spiridon, Alex (Palo Alto, CA); Benzel, Dave (Livermore, CA); Dowla, Farid U. (Castro Valley, CA); Nekoogar, Faranak (San Ramon, CA); Rosenbury, Erwin T. (Castro Valley, CA)

2007-12-04T23:59:59.000Z

79

Tuning Band Gap Energies in Pb3(C6X6) Extended Solid-State Structures  

SciTech Connect

A detailed plane-wave density functional theory investigation of the solid-state properties of the extended organometallic system Pb{sub 3}C{sub 6}X{sub 6} for X = O, S, Se, and Te has been performed. Initial geometry parameters for the Pb-X and C-X bond distances were obtained from optimized calculations on molecular fragment models. The Pb{sub 3}C{sub 6}X{sub 6} extended solid molecular structures were constructed in the space group P6/mmm on the basis of the known structure for X = S. Ground-state geometries, band gap energies, densities of states, and charge densities were calculated with the PBE-generalized gradient exchange-correlation functional and the HSE06 hybrid exchange-correlation functional. The PBE band gap energies were found to be lower than the HSE06 values by >0.7 eV. The band energies at points of high symmetry along the first Brillouin zone in the crystal were larger than the overall band gap of the system. Pb{sub 3}C{sub 6}O{sub 6} was predicted to be a direct semiconductor ({Lambda} point) with a PBE band gap of 0.28 eV and an HSE06 band gap of 1.06 eV. Pb{sub 3}C{sub 6}S{sub 6} and Pb{sub 3}C{sub 6}Se{sub 6} were predicted to have indirect band gaps. The PBE band gap for Pb{sub 3}C{sub 6}S{sub 6} was 0.98 eV, and the HSE06 band gap was 1.91 eV. The HSE06 value is in good agreement with the experimentally observed band gap of 1.7 eV. Pb{sub 3}C{sub 6}Se{sub 6} has a PBE band gap of 0.56 eV and a HSE06 band gap of 1.41 eV. Pb{sub 3}C{sub 6}Te{sub 6} was predicted to be metallic with both of the PBE and HSE06 functionals. A detailed analysis of the PBE band structure and partial density of states at two points before and after the metallic behavior reveals a change in orbital character indicative of band crossing in Pb{sub 3}C{sub 6}Te{sub 6}. These results show that the band gap energies can be fine-tuned by changing the substituent X atom.

Stott, Amanda C.; Vaid, Thomas P.; Bylaska, Eric J.; Dixon, David A.

2012-04-19T23:59:59.000Z

80

Omnidirectional fiber optic tiltmeter  

DOE Patents (OSTI)

A tiltmeter is provided which is useful in detecting very small movements such as earth tides. The device comprises a single optical fiber, and an associated weight affixed thereto, suspended from a support to form a pendulum. A light source, e.g., a light emitting diode, mounted on the support transmits light through the optical fiber to a group of further optical fibers located adjacent to but spaced from the free end of the single optical fiber so that displacement of the single optical fiber with respect to the group will result in a change in the amount of light received by the individual optical fibers of the group. Photodetectors individually connectd to the fibers produce corresponding electrical outputs which are differentially compared and processed to produce a resultant continuous analog output representative of the amount and direction of displacement of the single optical fiber.

Benjamin, B.C.; Miller, H.M.

1983-06-30T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Receiver control for the Submillimeter Array  

E-Print Network (OSTI)

Efficient operation of a submillimeter interferometer requires remote (preferably automated) control of mechanically tuned local oscillators, phase-lock loops, mixers, optics, calibration vanes and cryostats. The present control system for these aspects of the Submillimeter Array (SMA) will be described. Distributed processing forms the underlying architecture. In each antenna cabin, a serial network of up to ten independent 80C196 microcontroller boards attaches to the real-time PowerPC computer (running LynxOS). A multi-threaded, gcc-compiled program on the PowerPC accepts top-level requests via remote procedure calls (RPC), subsequently dispatches tuning commands to the relevant microcontrollers, and regularly reports the system status to optical-fiber-based reflective memory for common access by the telescope monitor and error reporting system. All serial communication occurs asynchronously via encoded, variable-length packets. The microcontrollers respond to the requested commands and queries by accessing non-volatile, rewriteable lookup-tables (when appropriate) and executing embedded software that operates additional electronic devices (DACs, ADCs, etc.). Since various receiver hardware components require linear or rotary motion, each microcontroller also implements a position servo via a one-millisecond interrupt service routine which drives a DC-motor/encoder combination that remains standard across each subsystem.

T. R. Hunter; R. W. Wilson; R. Kimberk; P. S. Leiker; R. D. Christensen

2005-09-26T23:59:59.000Z

82

FPGA side-channel receivers  

Science Conference Proceedings (OSTI)

The popularity of FPGAs is rapidly growing due to the unique advantages that they offer. However, their distinctive features also raise new questions concerning the security and communication capabilities of an FPGA-based hardware platform. In this paper, ... Keywords: ddr2, fpga, i2c, phase shift, side-channel receiver, thermal

Ji Sun; Ray Bittner; Ken Eguro

2011-02-01T23:59:59.000Z

83

RFID receiver apparatus and method  

DOE Patents (OSTI)

An RFID backscatter interrogator for transmitting data to an RFID tag, generating a carrier for the tag, and receiving data from the tag modulated onto the carrier, the interrogator including a single grounded-coplanar wave-guide circuit board and at least one surface mount integrated circuit supported by the circuit board.

Scott, Jeffrey Wayne (Pasco, WA)

2006-12-26T23:59:59.000Z

84

The Faint X-ray Source Population Near the 3C 295 cluster  

E-Print Network (OSTI)

We present a statistical analysis of the Chandra observation of the source field around the 3C 295 galaxy cluster (z=0.46). Three different methods of analysis, namely a chip by chip logN-logS, a two dimentional Kolmogorov-Smirnov (KS) test, and the angular correlation function (ACF) show a strong overdensity of sources in the North-East of the field, that may indicate a filament of the large scale structure of the Universe toward 3C 295.

V. D'Elia; F. Fiore; M. Elvis; M. Cappi; S. Mathur; P. Mazzotta; E. Falco; F. Cocchia

2004-06-03T23:59:59.000Z

85

Fe/Al2O3 C2H4 Hata mm/10 min  

E-Print Network (OSTI)

Fe/Al2O3 C2H4 () () () () () () () * () 1. (SWNT) SWNT (CVD) (CNT)[1] Hata mm/10 min SWNT (Super Growth)[2]Al2O3 Fe C2H4 SWNT Fe/Al2O3 C2H4 CVD SWNT CNT CNT 2 SiO2 Al2O3 20 (RBM) 1350 cm-1 (D-Band)Fe G/D RBM Fe SWNT Al 15 nm Fe 0.6 nm CVD TEM Fig. 3 3 nm SWNT

Maruyama, Shigeo

86

Data:3c67a7c1-9c44-435c-9c3c-70daeb652095 | Open Energy Information  

Open Energy Info (EERE)

7a7c1-9c44-435c-9c3c-70daeb652095 7a7c1-9c44-435c-9c3c-70daeb652095 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand transformer Ownership Discount with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

87

A 3D-3C Reflection Seismic Survey and Data Integration to Identify the  

Open Energy Info (EERE)

D-3C Reflection Seismic Survey and Data Integration to Identify the D-3C Reflection Seismic Survey and Data Integration to Identify the Seismic Response of Fractures and Permeable Zones Over a Known Geothermal Resource at Soda Lake, Churchill Co., NV Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title A 3D-3C Reflection Seismic Survey and Data Integration to Identify the Seismic Response of Fractures and Permeable Zones Over a Known Geothermal Resource at Soda Lake, Churchill Co., NV Project Type / Topic 1 Recovery Act: Geothermal Technologies Program Project Type / Topic 2 Validation of Innovative Exploration Technologies Project Description The Soda Lake geothermal field is an ideal setting to test the applicability of the 3D-3C reflection seismic method because: it is a producing field with a great deal of geologic and drilling data already available; it is in an alluvial valley where the subsurface structures that carry the geothermal fluids have no surface manifestations; and, there are downhole geophysical logs of fractures and permeable zones that can be used to ground-truth the new data.

88

Multichannel optical sensing device  

DOE Patents (OSTI)

A multichannel optical sensing device is disclosed, for measuring the outr sky luminance or illuminance or the luminance or illuminance distribution in a room, comprising a plurality of light receptors, an optical shutter matrix including a plurality of liquid crystal optical shutter elements operable by electrical control signals between light transmitting and light stopping conditions, fiber optic elements connected between the receptors and the shutter elements, a microprocessor based programmable control unit for selectively supplying control signals to the optical shutter elements in a programmable sequence, a photodetector including an optical integrating spherical chamber having an input port for receiving the light from the shutter matrix and at least one detector element in the spherical chamber for producing output signals corresponding to the light, and output units for utilizing the output signals including a storage unit having a control connection to the microprocessor based programmable control unit for storing the output signals under the sequence control of the programmable control unit.

Selkowitz, Stephen E. (Piedmont, CA)

1990-01-01T23:59:59.000Z

89

Transmitter and Translating Receiver Design For 64-ary Pulse Position Modulation (PPM)  

SciTech Connect

This paper explores the architecture and design of an optically-implemented 64-ary PPM transmitter and direct-translating receiver that effectively translates incoming electrically-generated bit streams into optical PPM symbols (and vice-versa) at > 1 Gb/s data rates. The PPM transmitter is a cascade of optical switches operating at the frame rate. A corresponding receiver design is more difficult to architect and implement, since increasing data rates lead to correspondingly shorter decision times (slot times and frame times). We describe a solution in the form of a time-to-space mapping arrayed receiver that performs a translating algorithm represented as a code map. The technique for generating the code map is described, and the implementation of the receiver as a planar lightwave circuit is given. The techniques for implementing the transmitter and receiver can be generalized for any case of M-ary PPM.

Mendez, A J; Hernandez, V J; Gagliardi, R M; Bennett, C V

2010-01-20T23:59:59.000Z

90

Tubular well tool receiving conduit  

SciTech Connect

In combination, a well packer and a tubular well tool receiving conduit are described which consists of: a well packer having an expandable and retractable anchoring teeth and an expandable and retractable seal spaced from the anchoring teeth, a tubular well conduit including, a first plurality of circularly extending grooves on the inside of the conduit for coacting with the anchoring teeth for supporting the well tool in the conduit, a second plurality of circularly extending grooves on the inside of the conduit and positioned for coacting with the expandable seal for providing multiple seal points with the seal.

Durst, D.G.; Morris, A.J.

1986-07-15T23:59:59.000Z

91

Data:1109b305-0872-4c90-b32a-3c2adf56625a | Open Energy Information  

Open Energy Info (EERE)

b305-0872-4c90-b32a-3c2adf56625a b305-0872-4c90-b32a-3c2adf56625a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: C & L Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Controlled Agricultural Water Pumping (Optional) Sector: Commercial Description: Available to consumers who are receiving service or are eligible to receive service for Agricultural Water Pumping Rate Schedule #7. Incentive is equal to $.019 per kWh. Incentive will be applied either as a credit on the consumer's monthly bill or as a credit on the final bill of the season. Control period shall be up to a maximum of 2 1/2 hours per day between the hours of 2:30 pm and 8:30 pm during the months of June and September.

92

Repository receiving facility design support  

Science Conference Proceedings (OSTI)

This report provides preliminary design criteria and proposed design features to reduce the occupational radiation exposure and the transportation turnaround time during receipt of waste shipments at a Federal high-level nuclear waste repository. A cost/benefit analysis is provided. Much of the data presented in previous reports was revised and upgraded to reflect current estimates of waste generation/receipt volumes so as to provide a baseline comparison case for the cost/benefit analysis. The National Waste Repository in Basalt receiving facility operational manpower requirements, estimated occupational dose exposures and capital cost estimates were revised by scaling factors based on the volume receipts. All capital cost estimates were expressed in terms of 1983 dollars. The repository receiving facility was divided into two main areas. The cask handling facility for unloading shipments of spent fuel high-level vitrified wastes and spent fuel cladding hulls, and the TRU-waste handling facility for unloading 55-, 80-, and 600-drum shipments. In both areas, remote handling techniques were employed as much as practical. Occupational dose estimates were formulated based on an operational time and motion survey for truck and rail shipping packages and reference dose maps for each corresponding package. 9 references, 5 figures, 22 tables.

Cottrell, J.E.; Dabolt, R.J.; Steneck, P.D.

1983-07-01T23:59:59.000Z

93

Microsoft Word - OPC Security WP 3 _Version 1-3c_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

intrinsically secure intrinsically secure po box 178 #5 - 7217 Lantzville rd lantzville, bc canada v0r 2h0 office 250.390.1333 fax 250.390.3899 www.byressecurity.com Digital Bond suite 130 1580 sawgrass corp pkwy sunrise, FL 33323 office 954.315.4633 www.digitalbond.com OPC Security Whitepaper #3 Hardening Guidelines for OPC Hosts PREPARED BY: Digital Bond British Columbia Institute of Technology Byres Research November 13, 2007 OPC Security WP 3 (Version 1-3c).doc OPC Security Whitepaper #3 Hardening Guidelines for OPC Hosts OPC Security WP 3 (Version 1-3c).doc ii November 2007 Revision History Revision Date Authors Details 0.7 May 15, 2006 E. Byres, M Franz, Draft internal review version 1.0 May 31, 2006 E. Byres, J. Carter, M Franz Draft for controlled public review

94

Surface studies of hydrogen etched 3C-SiC(001) on Si(001)  

Science Conference Proceedings (OSTI)

The morphology and structure of 3C-SiC(001) surfaces, grown on Si(001) and prepared via hydrogen etching, are studied using atomic force microscopy (AFM), low-energy electron diffraction (LEED), and Auger electron spectroscopy (AES). On the etched samples, flat surfaces with large terraces and atomic steps are revealed by AFM. In ultrahigh vacuum a sharp LEED pattern with an approximate (5x1) periodicity is observed. AES studies reveal a ''bulklike'' composition up to the near surface region and indicate that an overlayer consisting of a weakly bound silicon oxide monolayer is present.

Coletti, C.; Frewin, C. L.; Saddow, S. E.; Hetzel, M.; Virojanadara, C.; Starke, U. [Electrical Engineering Department, University of South Florida, Tampa, Florida 33620 (United States); Max-Planck-Institut fuer Festkoerperforschung, Heisenbergstr. 1, D-70569 Stuttgart (Germany)

2007-08-06T23:59:59.000Z

95

Prediction and optimization of the performance of parabolic solar dish concentrator with sphere receiver using analytical function  

E-Print Network (OSTI)

Parabolic solar dish concentrator with sphere receiver is less studied. We present an analytic function to calculate the intercept factor of the system with real sun bright distribution and Gaussian distribution, the results indicate that the intercept factor is related to the rim angle of reflector and the ratio of open angle of receiver at the top of reflector to optical error when the optical error is larger than or equal to 5 mrad, but is related to the rim angle, open angle and optical error in less than 5 mrad optical error. Furthermore we propose a quick process to optimize the system to provide the maximum solar energy to net heat efficiency for different optical error under typical condition. The results indicate that the parabolic solar dish concentrator with sphere receiver has rather high solar energy to net heat efficiency which is 20% more than solar trough and tower system including higher cosine factor and lower heat loss of the receiver.

Huang, Weidong; Hu, Peng; Chen, Zeshao

2011-01-01T23:59:59.000Z

96

Ohmic contacts to single-crystalline 3C-SiC films for extreme-environment MEMS applications  

Science Conference Proceedings (OSTI)

This paper describes the ohmic contacts to single-crystalline 3C-SiC thin films heteroepitaxially grown on Si (001) wafers. In this work, a TiW (titanium-tungsten) film was deposited as a contact material by RF magnetron sputter and annealed through ... Keywords: Contact resistivity, Ohmic contact, Single-crystalline 3C-SiC, TiW

Gwiy-Sang Chung; Kyu-Hyung Yoon

2008-12-01T23:59:59.000Z

97

Trough Receiver Heat Loss Testing (Presentation)  

DOE Green Energy (OSTI)

This presentation describes the design, fabrication, and qualification of an experimental capability for thermal loss testing of full-size trough receiver elements; and the testing on a variety of receivers.

Lewandowski, A.; Feik, C.; Hansen, R.; Phillips, S.; Bingham, C.; Netter, J.; Forristal, R.; Burkholder, F.; Meglan, B.; Wolfrum, E.

2006-02-01T23:59:59.000Z

98

SLAC National Accelerator Laboratory - SLAC Physicist Receives...  

NLE Websites -- All DOE Office Websites (Extended Search)

Receives Free-electron Laser Award By Glenn Roberts Jr. September 10, 2013 Dao Xiang, a SLAC accelerator physicist, has received an international award for his work on a technique...

99

ITL Staff Members Receive Tech Transfer Award  

Science Conference Proceedings (OSTI)

ITL Staff Members Receive Tech Transfer Award. ... Regional "Excellence in Technology Transfer" Award for ... the process of transferring a technology ...

2010-10-05T23:59:59.000Z

100

Data:Fbfe85c3-62fc-4344-89c0-3c8a1c2fc7dd | Open Energy Information  

Open Energy Info (EERE)

Fbfe85c3-62fc-4344-89c0-3c8a1c2fc7dd Fbfe85c3-62fc-4344-89c0-3c8a1c2fc7dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Roadway/General Lighting (HPS 150w, Muni Discount) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:5e52d4d6-cd3c-4448-92c4-ac93b1e528b0 | Open Energy Information  

Open Energy Info (EERE)

d6-cd3c-4448-92c4-ac93b1e528b0 d6-cd3c-4448-92c4-ac93b1e528b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: End date if known: Rate name: Optional CP Generation Sector: Description: Optional Pricing for Three Phase Service: Availability of Three Phase Service: Any single phase service with transformer capacity greater than 50 KVA and all three phase services up to 1,000 kVA; upon election by any small commercial or public authority consumer for a minimum of 12 consecutive months; subject to the established rules and regulations. Criteria for Optional CP Generation Pricing To receive this option, the consumer shall be charged for the excess cost of special metering based upon the additional cost of said metering times the Cooperative's then effective fixed charge rate, or at the Cooperative's option, the CP Cost of Service Charge shall apply.

102

Data:6db2148d-bfe0-4db7-bc95-e02e3c5a7848 | Open Energy Information  

Open Energy Info (EERE)

db2148d-bfe0-4db7-bc95-e02e3c5a7848 db2148d-bfe0-4db7-bc95-e02e3c5a7848 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: General Service-Demand Primary Sector: Industrial Description: APPLICABLE: A Customer will receive service on this schedule if the Large Light and Power schedule is not applicable and if any of the following conditions are met: Energy usage is greater than 25,000 kWh per BILLING PERIOD for each of six consecutive BILLING PERIODS. The Customer's demand is greater than 100 kW in two summer BILLING PERIODS including the current BILLING PERIOD and all BILLING PERIODS in the preceding 11 months.

103

Shipping and Receiving | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Employee Services » Facility Operations » Shipping Services » Employee Services » Facility Operations » Shipping and Receiving Shipping and Receiving Headquarters Receiving Services Information It is our responsibility to get your package to you as quickly as possibly. In order to accomplish this, we must first receive it. However, it is difficult to receive your package if it arrives without being properly addressed. When placing orders with commercial vendors, it is imperative that you let them know the addressees name, mail stop code, room number, location (Forrestal or Germantown) and the address. This information will allow us to receive your order and not reject it. It will also help if you would provide our office with a copy of your purchase order which will assist us in efficiently receiving your order and getting it to you.

104

High throughput optical scanner  

SciTech Connect

A scanning apparatus is provided to obtain automated, rapid and sensitive scanning of substrate fluorescence, optical density or phosphorescence. The scanner uses a constant path length optical train, which enables the combination of a moving beam for high speed scanning with phase-sensitive detection for noise reduction, comprising a light source, a scanning mirror to receive light from the light source and sweep it across a steering mirror, a steering mirror to receive light from the scanning mirror and reflect it to the substrate, whereby it is swept across the substrate along a scan arc, and a photodetector to receive emitted or scattered light from the substrate, wherein the optical path length from the light source to the photodetector is substantially constant throughout the sweep across the substrate. The optical train can further include a waveguide or mirror to collect emitted or scattered light from the substrate and direct it to the photodetector. For phase-sensitive detection the light source is intensity modulated and the detector is connected to phase-sensitive detection electronics. A scanner using a substrate translator is also provided. For two dimensional imaging the substrate is translated in one dimension while the scanning mirror scans the beam in a second dimension. For a high throughput scanner, stacks of substrates are loaded onto a conveyor belt from a tray feeder.

Basiji, David A. (Seattle, WA); van den Engh, Gerrit J. (Seattle, WA)

2001-01-01T23:59:59.000Z

105

Evaluation of Veda, Inc. , central receiver solar collection system concept  

DOE Green Energy (OSTI)

The Unified Heliostat Array (UHA) is a geometrical heliostat field layout with rows of mirrors placed at various levels on terraces. The Veda Industrial Heliostat (VIH) is a toroidal segment mirror mounted on an equatorial mount. These two concepts are evaluated to assess the credibility of the optical designs and the validity of UHA and VIH performance estimates, to determine what the distinctive features embodied in UHA AND VIH concepts offer that more conventional central receiver technologies do not, and to determine where the UHA and VIH concepts might be most applicable in DOE's Solar Thermal Program. The UHA area efficiency, flux density distribution, and beam safety are evaluated, and the feasibility of using a secondary mirror and the potential for special applications are assessed. The optical design, equatorial mount, and manufacturability of the VIH are evaluated. (LEW)

Ator, J.

1981-08-01T23:59:59.000Z

106

Optical apparatus for forming correlation spectrometers and optical processors  

DOE Patents (OSTI)

Optical apparatus is disclosed for forming correlation spectrometers and optical processors. The optical apparatus comprises one or more diffractive optical elements formed on a substrate for receiving light from a source and processing the incident light. The optical apparatus includes an addressing element for alternately addressing each diffractive optical element thereof to produce for one unit of time a first correlation with the incident light, and to produce for a different unit of time a second correlation with the incident light that is different from the first correlation. In preferred embodiments of the invention, the optical apparatus is in the form of a correlation spectrometer; and in other embodiments, the apparatus is in the form of an optical processor. In some embodiments, the optical apparatus comprises a plurality of diffractive optical elements on a common substrate for forming first and second gratings that alternately intercept the incident light for different units of time. In other embodiments, the optical apparatus includes an electrically-programmable diffraction grating that may be alternately switched between a plurality of grating states thereof for processing the incident light. The optical apparatus may be formed, at least in part, by a micromachining process. 24 figs.

Butler, M.A.; Ricco, A.J.; Sinclair, M.B.; Senturia, S.D.

1999-05-18T23:59:59.000Z

107

Electric Charge Quantization in SU(3)_C X SU(3)_L X U(1)_X Models  

E-Print Network (OSTI)

Basing on the general photon eigenstate and the anomaly cancelation, we have naturally explained the electric charge quantization in two models based on the SU(3)_C X SU(3)_L X U(1)_X gauge group, namely in the minimal model and in the model with right-handed neutrinos. In addition, we have shown that the electric charges of the proton and of the electron are opposite; and the same happens with the neutron and the neutrino. We argue that the electric charge quantization is not dependent on the classical constraints on generating mass to the fermions, but it is related closely with the generation number problem. In fact, both problems are properly solved as the direct consequences of the fermion content under the anomaly free conditions.

Phung Van Dong; Hoang Ngoc Long

2005-07-13T23:59:59.000Z

108

The Heart-shaped Supernova Remnant 3C391 viewed in Multi-bands  

E-Print Network (OSTI)

Using Chandra X-ray, Spitzer mid-IR, and 1.5 GHz radio data, we examine the spatial structure of SNR 3C391. The X-ray surface brightness is generally anti-correlative with the IR and radio brightness. The multiband data clearly exhibit a heart-shaped morphology and show the multi-shell structure of the remnant. A thin brace-like shell on the south detected at 24 um is projected outside the radio border and confines the southern faint X-ray emission. The leading 24 um knot on the SE boundary appears to be partly surrounded by soft X-ray emitting gas. The mid-IR emission is dominated by the contribution of the shocked dust grains, which may have been partly destroyed by sputtering.

Yang Su; Yang Chen

2007-03-29T23:59:59.000Z

109

The Heart-shaped Supernova Remnant 3C391 viewed in Multi-bands  

E-Print Network (OSTI)

Using Chandra X-ray, Spitzer mid-IR, and 1.5 GHz radio data, we examine the spatial structure of SNR 3C391. The X-ray surface brightness is generally anti-correlative with the IR and radio brightness. The multiband data clearly exhibit a heart-shaped morphology and show the multi-shell structure of the remnant. A thin brace-like shell on the south detected at 24 um is projected outside the radio border and confines the southern faint X-ray emission. The leading 24 um knot on the SE boundary appears to be partly surrounded by soft X-ray emitting gas. The mid-IR emission is dominated by the contribution of the shocked dust grains, which may have been partly destroyed by sputtering.

Su, Yang

2007-01-01T23:59:59.000Z

110

Origin of radiation tolerance in 3C-SiC with nanolayered planar defects  

SciTech Connect

We have recently found that the radiation tolerance of SiC is highly enhanced by introducing nanolayers of stacking faults and twins [Y. Zhang et al., Phys. Chem. Chem. Phys. 14, 13429 (2012)]. To reveal the origin of this radiation resistance, we used in situ transmission electron microscopy to examine structural changes induced by electron beam irradiation in 3C-SiC containing nanolayers of (111) planar defects. We found that preferential amorphization, when it does occur, takes place at grain boundaries and at 111 and 111 planar defects. Radiationinduced point defects, such as interstitials and vacancies, migrate two-dimensionally between the (111) planar defects, which probably enhances the damage recovery.

Ishimaru, Dr. Manabu [Osaka University; Zhang, Yanwen [ORNL; Shannon, Prof. Steven [North Carolina State University; Weber, William J [ORNL

2013-01-01T23:59:59.000Z

111

Origin of radiation tolerance in 3C-SiC with nanolayered planar defects  

SciTech Connect

We have recently found that the radiation tolerance of SiC is highly enhanced by introducing nanolayers of stacking faults and twins [Y. Zhang et al., Phys. Chem. Chem. Phys. 14, 13429 (2012)]. To reveal the origin of this radiation resistance, we used in situ transmission electron microscopy to examine structural changes induced by electron beam irradiation in 3C-SiC containing nanolayers of (111) planar defects. We found that preferential amorphization, when it does occur, takes place at grain boundaries and at (111) and (111) planar defects. Radiation-induced point defects, such as interstitials and vacancies, migrate two-dimensionally between the (111) planar defects, which probably enhances the damage recovery.

Ishimaru, Manabu [Institute of Scientific and Industrial Research, Osaka University, Osaka 567-0047 (Japan); Zhang Yanwen; Weber, William J. [Materials Science and Technology Division, Oak Ridge National Laboratory, Tennessee 37831-6138 (United States); Department of Materials Science and Engineering, University of Tennessee, Tennessee 37996 (United States); Shannon, Steven [Department of Nuclear Engineering, North Carolina State University, Raleigh, North Carolina 27695 (United States)

2013-07-15T23:59:59.000Z

112

Overdensity of X-Ray sources near 3C 295: a candidate filament  

E-Print Network (OSTI)

We present a statistical analysis of the Chandra observation of the source field around the 3C 295 galaxy cluster (z=0.46) aimed at the search for clustering of X-ray sources. Three different methods of analysis, namely a chip by chip logN-logS, a two dimensional Kolmogorov-Smirnov test, and the angular correlation function (ACF) show a strong overdensity of sources in the North-East of the field. In particular, the ACF shows a clear signal on scales of 0.5 - 5 arcmin. This correlation angle is > 2 times higher than that of a sample of 8 ACIS-I field at the 2.5 sigma confidence level. If this overdensity is spatially associated to the cluster, we are observing a 'filament' of the large scale structure of the Universe. We discuss some first results that seem to indicate such an association.

V. D'Elia; F. Fiore; F. Cocchia

2004-07-22T23:59:59.000Z

113

EIA Energy Efficiency-Table 3c. Capacity Adjusted Value of Production a by  

Gasoline and Diesel Fuel Update (EIA)

c c Page Last Modified: May 2010 Table 3c. Capacity Adjusted Value of Production 1 by Selected Industries, 1998, 2002, and 2006 (Current Billion Dollars) MECS Survey Years NAICS Subsector and Industry 1998 2002 2006 311 Food Manufacturing 430 468 552 312 Beverage and Tobacco Product Manufacturing 98 120 131 313 Textile Mills 57 50 44 314 Textile Product Mills 31 34 36 315 Apparel Manufacturing 66 53 31 316 Leather and Allied Product Manufacturing 11 8 7 321 Wood Product Manufacturing 87 94 110 322 Paper Manufacturing 159 160 177 323 Printing and Related Support Activities 104 109 107 324 Petroleum and Coal Products Manufacturing 134 215 523 325 Chemical Manufacturing 415 470 657 326 Plastics and Rubber Products Manufacturing 158 183 212 327 Nonmetallic Mineral Product Manufacturing 85 97 134

114

Large area quasi-free standing monolayer graphene on 3C-SiC(111)  

Science Conference Proceedings (OSTI)

Large scale, homogeneous quasi-free standing monolayer graphene is obtained on cubic silicon carbide, i.e., the 3C-SiC(111) surface, which represents an appealing and cost effective platform for graphene growth. The quasi-free monolayer is produced by intercalation of hydrogen under the interfacial, (6{radical}(3)x6{radical}(3))R30 deg.-reconstructed carbon layer. After intercalation, angle resolved photoemission spectroscopy reveals sharp linear {pi}-bands. The decoupling of graphene from the substrate is identified by x-ray photoemission spectroscopy and low energy electron diffraction. Atomic force microscopy and low energy electron microscopy demonstrate that homogeneous monolayer domains extend over areas of hundreds of square-micrometers.

Coletti, C. [Max-Planck-Institut fuer Festkoerperforschung, Heisenbergstr. 1, D-70569 Stuttgart (Germany); Center for Nanotechnology Innovation and NEST, Istituto Italiano di Tecnologia, Piazza San Silvestro 12, 56127 Pisa (Italy); Emtsev, K. V.; Starke, U. [Max-Planck-Institut fuer Festkoerperforschung, Heisenbergstr. 1, D-70569 Stuttgart (Germany); Zakharov, A. A. [MAX-Lab, Lund University, Box 118, Lund S-22100 (Sweden); Ouisse, T.; Chaussende, D. [Laboratoire des Materiaux et du Genie Physique-CNRS UMR5628--Grenoble INP, Minatec 3 parvis Louis Neel, BP 257, 38016 Grenoble (France)

2011-08-22T23:59:59.000Z

115

1. INTRODUCTION TO OPTICAL RADIOMETRY Raju U. Datla ...  

Science Conference Proceedings (OSTI)

... optical heating of the cavity are eliminated ... in estimating the amount of solar energy available ... measurement equation describes receiver output due ...

2010-08-19T23:59:59.000Z

116

Module Title: Telecommunications Code: EE3C5 Level: Junior Sophister Credits: 5 Prerequisites: None  

E-Print Network (OSTI)

1 Power consumption modeling in optical multilayer networks Ward Van Heddeghem, Filip Idzikowski, Germany Abstract -- The evaluation and reduction of energy consumption of backbone telecommunication in these studies is the power consumption of the individual network devices. It appears that across different

O'Mahony, Donal E.

117

Analysis of the omnium-g receiver  

DOE Green Energy (OSTI)

A thermal analysis of the Omnium-G receiver is presented and the technique is shown to be generally applicable to solar thermal receivers utilizing a directly heated thermal mass. The thermal loss coefficient, including reradiation losses, is calculated and shown to agree quite well with the experimentally measured thermal loss coefficient. The rate of heat transfer to the working fluid is also analyzed and the analysis is used to show that the Omnium-G receiver is well matched to the water/steam working fluid because the steam outlet temperature is almost the same as the receiver temperature. A general procedure for calculating receiver performance is presented. With this procedure, the energy delivery to any working fluid, the delivered temperature of the working fluid, and the pressure drop through the receiver can be determined. An example of the calculation is also presented.

Bohn, M.

1980-03-01T23:59:59.000Z

118

Low Cost Fiber-Optic Links for Digital Applications  

E-Print Network (OSTI)

will allow longer fiber-optic links to operate at fre- quencies beyond the flat portion of the system side of the board. Production fiber-optic systems can Equation 4. OPM (dB) = Optical power margin. PR shielding should be applied to the receiver if the system using the fiber-optic link is extremely noisy

Berns, Hans-Gerd

119

Strategic Petroleum Reserve Receives Prestigious Environmental Award |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Petroleum Reserve Receives Prestigious Environmental Strategic Petroleum Reserve Receives Prestigious Environmental Award Strategic Petroleum Reserve Receives Prestigious Environmental Award September 22, 2009 - 1:00pm Addthis Washington, DC - The Department of Energy's Office of Fossil Energy (FE) announced today that the Strategic Petroleum Reserve (SPR) has received the Most Valuable Pollution Prevention Project (MVP2) award from the National Pollution Prevention Roundtable for lowering potential greenhouse gas emissions. This is the first time the SPR has captured the award for its commitment to pollution prevention, focusing on innovation, measurable results, transferability, commitment, and optimization of available project resources. "This is another example of the hard work and dedication by employees at

120

Strategic Petroleum Reserve Receives Prestigious Environmental Award |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Petroleum Reserve Receives Prestigious Environmental Strategic Petroleum Reserve Receives Prestigious Environmental Award Strategic Petroleum Reserve Receives Prestigious Environmental Award September 22, 2009 - 1:00pm Addthis Washington, DC - The Department of Energy's Office of Fossil Energy (FE) announced today that the Strategic Petroleum Reserve (SPR) has received the Most Valuable Pollution Prevention Project (MVP2) award from the National Pollution Prevention Roundtable for lowering potential greenhouse gas emissions. This is the first time the SPR has captured the award for its commitment to pollution prevention, focusing on innovation, measurable results, transferability, commitment, and optimization of available project resources. "This is another example of the hard work and dedication by employees at

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Substance abuse differences among students receiving special ...  

Science Conference Proceedings (OSTI)

abilities to cope with daily pressures and extended social environ- ments like schools. Typically, children and youth receiving special ed- ucation school services...

122

Receiver System: Lessons Learned From Solar Two  

DOE Green Energy (OSTI)

The Boeing Company fabricated the Solar Two receiver as a subcontractor for the Solar Two project. The receiver absorbed sunlight reflected from the heliostat field. A molten-nitrate-salt heat transfer fluid was pumped from a storage tank at grade level, heated from 290 to 565 C by the receiver mounted on top of a tower, then flowed back down into another storage tank. To make electricity, the hot salt was pumped through a steam generator to produce steam that powered a conventional Rankine steam turbine/generator. This evaluation identifies the most significant Solar Two receiver system lessons learned from the Mechanical Design, Instrumentation and Control, Panel Fabrication, Site Construction, Receiver System Operation, and Management from the perspective of the receiver designer/manufacturer. The lessons learned on the receiver system described here consist of two parts: the Problem and one or more identified Solutions. The appendix summarizes an inspection of the advanced receiver panel developed by Boeing that was installed and operated in the Solar Two receiver.

LITWIN, ROBERT Z.; PACHECO, JAMES E.

2002-03-01T23:59:59.000Z

123

Stationary concentrators for tubular evacuated receivers: optimization and comparison of reflector designs  

SciTech Connect

Tubular evacuated receivers such as those manufactured by Owens-Illinois and General Electric Company offer considerable potential for cost-effective solar collectors for heating and cooling and for industrial process heat applications. The receivers were originally introduced in collectors having simple reflector shapes to augment the receiver tube area presented to the sun. More recent commercial collectors use nonimaging concentrators. Comparisons of the optical efficiencies of the different collector designs are presented as a function of incident angle, and the factors which determine the optical performance of a given concentrator design are discussed. Although different concentrator designs would be recommended for various combinations of receiver characteristics, collector materials, manufacturing costs and operating temperatures, it is clear that optimized nonimaging concentrators, originated by Winston and further developed at both the University of Chicago and Argonne National Laboratory offer substantial advantages over other concentrator designs for the concentration ratios of interest.

McIntire, W.R.

1980-01-01T23:59:59.000Z

124

STAR-JET INTERACTIONS AND GAMMA-RAY OUTBURSTS FROM 3C454.3  

Science Conference Proceedings (OSTI)

We propose a model to explain the ultra-bright GeV gamma-ray flares observed from the blazar 3C454.3. The model is based on the concept of a relativistic jet interacting with compact gas condensations produced when a star (a red giant) crosses the jet close to the central black hole. The study includes an analytical treatment of the evolution of the envelope lost by the star within the jet, and calculations of the related high-energy radiation. The model readily explains the day-long that varies on timescales of hours, GeV gamma-ray flare from 3C454.3, observed during 2010 November on top of a plateau lasting weeks. In the proposed scenario, the plateau state is caused by a strong wind generated by the heating of the stellar atmosphere due to nonthermal particles accelerated at the jet-star interaction region. The flare itself could be produced by a few clouds of matter lost by the red giant after the initial impact of the jet. In the framework of the proposed scenario, the observations constrain the key model parameters of the source, including the mass of the central black hole: M{sub BH} {approx_equal} 10{sup 9} M{sub Sun }, the total jet power: L{sub j} {approx_equal} 10{sup 48} erg s{sup -1}, and the Doppler factor of the gamma-ray emitting clouds: {delta} {approx_equal} 20. Whereas we do not specify the particle acceleration mechanisms, the potential gamma-ray production processes are discussed and compared in the context of the proposed model. We argue that synchrotron radiation of protons has certain advantages compared to other radiation channels of directlyaccelerated electrons. An injected proton distribution {proportional_to}E {sup -1} or harder below the relevant energies would be favored to alleviate the tight energetic constraints and to avoid the violation of the observational low-energy constraints.

Khangulyan, D. V. [Institute of Space and Astronautical Science/JAXA, 3-1-1 Yoshinodai, Chuo-ku, Sagamihara, Kanagawa 252-5210 (Japan); Barkov, M. V. [Max-Planck-Institut fuer Kernphysik, Saupfercheckweg 1, D-69117 Heidelberg (Germany); Bosch-Ramon, V. [Departament d'Astronomia i Meteorologia, Institut de Ciencies del Cosmos (ICC), Universitat de Barcelona (IEEC-UB), Marti i Franques 1, E-08028 Barcelona (Spain); Aharonian, F. A. [Dublin Institute for Advanced Studies, 31 Fitzwilliam Place, Dublin 2 (Ireland); Dorodnitsyn, A. V. [Laboratory for High Energy Astrophysics, NASA Goddard Space Flight Center, Code 662, Greenbelt, MD 20771 (United States)

2013-09-10T23:59:59.000Z

125

Optical Radiation  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Optical Radiation Measurements. Fees for services are located directly below the technical contacts ...

2013-04-09T23:59:59.000Z

126

Liquid cooled fiber thermal radiation receiver  

DOE Patents (OSTI)

A radiation-to-thermal receiver apparatus for collecting radiation and converting it to thermal energy is disclosed. The invention includes a fibrous mat material which captures radiation striking the receiver. Captured radiation is removed from the fibrous mat material by a transparent fluid within which the material is bathed.

Butler, Barry L. (Del Mar, CA)

1987-01-01T23:59:59.000Z

127

Predictive modeling for collections of accounts receivable  

Science Conference Proceedings (OSTI)

It is commonly agreed that accounts receivable (AR) can be a source of financial difficulty for firms when they are not efficiently managed and are underperforming. Experience across multiple industries shows that effective management of AR and overall ... Keywords: accounts receivable, invoice to cash, knowledge discovery, order to cash, payment collection, predictive modeling

Sai Zeng; Ioana Boier-Martin; Prem Melville; Conrad Murphy; Christian A. Lang

2007-08-01T23:59:59.000Z

128

Liquid cooled fiber thermal radiation receiver  

DOE Patents (OSTI)

A radiation-to-thermal receiver apparatus for collecting radiation and converting it to thermal energy is disclosed. The invention includes a fibrous mat material which captures radiation striking the receiver. Captured radiation is removed from the fibrous mat material by a transparent fluid within which the material is bathed.

Butler, B.L.

1985-03-29T23:59:59.000Z

129

FIRST-PRINCIPLES CALCULATIONS OF INTRINSIC DEFECTS AND Mg TRANSMUTANTS IN 3C-SiC  

SciTech Connect

Silicon carbide (SiC) possesses many desirable attributes for applications in high-temperature and neutron radiation environments. These attributes include excellent dimensional and thermodynamic stability, low activation, high strength, and high thermal conductivity. Therefore, SiC based materials draw broad attention as structural materials for the first wall (FW) and blanket in fusion power plants. Under the severe high-energy neutron environment of D-T fusion systems, SiC suffers significant transmutation resulting in both gaseous and metallic transmutants. Recent calculations by Sawan, et al. [2] predict that at a fast neutron dose of ~100 dpa, there will be about 0.5 at% Mg generated in SiC through nuclear transmutation. Other transmutation products, including 0.15 at% Al, 0.2 at% Be and 2.2 at% He, also emerge. Formation and migration energies of point defects in 3C-SiC have been widely investigated using density functional theory (DFT). However, the properties of defects associated with transmutants are currently not well understood. Fundamental understanding of where the transmutation products go and how they affect microstructure evolution of SiC composites will help to predict property evolution and performance of SiC-based materials in fusion reactors.

Hu, Shenyang Y.; Setyawan, Wahyu; Van Ginhoven, Renee M.; Jiang, Weilin; Henager, Charles H.; Kurtz, Richard J.

2013-09-25T23:59:59.000Z

130

Systems Analysis of an Advanced Nuclear Fuel Cycle Based on a Modified UREX+3c Process  

SciTech Connect

The research described in this report was performed under a grant from the U.S. Department of Energy (DOE) to describe and compare the merits of two advanced alternative nuclear fuel cycles -- named by this study as the UREX+3c fuel cycle and the Alternative Fuel Cycle (AFC). Both fuel cycles were assumed to support 100 1,000 MWe light water reactor (LWR) nuclear power plants operating over the period 2020 through 2100, and the fast reactors (FRs) necessary to burn the plutonium and minor actinides generated by the LWRs. Reprocessing in both fuel cycles is assumed to be based on the UREX+3c process reported in earlier work by the DOE. Conceptually, the UREX+3c process provides nearly complete separation of the various components of spent nuclear fuel in order to enable recycle of reusable nuclear materials, and the storage, conversion, transmutation and/or disposal of other recovered components. Output of the process contains substantially all of the plutonium, which is recovered as a 5:1 uranium/plutonium mixture, in order to discourage plutonium diversion. Mixed oxide (MOX) fuel for recycle in LWRs is made using this 5:1 U/Pu mixture plus appropriate makeup uranium. A second process output contains all of the recovered uranium except the uranium in the 5:1 U/Pu mixture. The several other process outputs are various waste streams, including a stream of minor actinides that are stored until they are consumed in future FRs. For this study, the UREX+3c fuel cycle is assumed to recycle only the 5:1 U/Pu mixture to be used in LWR MOX fuel and to use depleted uranium (tails) for the makeup uranium. This fuel cycle is assumed not to use the recovered uranium output stream but to discard it instead. On the other hand, the AFC is assumed to recycle both the 5:1 U/Pu mixture and all of the recovered uranium. In this case, the recovered uranium is reenriched with the level of enrichment being determined by the amount of recovered plutonium and the combined amount of the resulting MOX. The study considered two sub-cases within each of the two fuel cycles in which the uranium and plutonium from the first generation of MOX spent fuel (i) would not be recycled to produce a second generation of MOX for use in LWRs or (ii) would be recycled to produce a second generation of MOX fuel for use in LWRs. The study also investigated the effects of recycling MOX spent fuel multiple times in LWRs. The study assumed that both fuel cycles would store and then reprocess spent MOX fuel that is not recycled to produce a next generation of LWR MOX fuel and would use the recovered products to produce FR fuel. The study further assumed that FRs would begin to be brought on-line in 2043, eleven years after recycle begins in LWRs, when products from 5-year cooled spent MOX fuel would be available. Fuel for the FRs would be made using the uranium, plutonium, and minor actinides recovered from MOX. For the cases where LWR fuel was assumed to be recycled one time, the 1st generation of MOX spent fuel was used to provide nuclear materials for production of FR fuel. For the cases where the LWR fuel was assumed to be recycled two times, the 2nd generation of MOX spent fuel was used to provide nuclear materials for production of FR fuel. The number of FRs in operation was assumed to increase in successive years until the rate that actinides were recovered from permanently discharged spent MOX fuel equaled the rate the actinides were consumed by the operating fleet of FRs. To compare the two fuel cycles, the study analyzed recycle of nuclear fuel in LWRs and FRs and determined the radiological characteristics of irradiated nuclear fuel, nuclear waste products, and recycle nuclear fuels. It also developed a model to simulate the flows of nuclear materials that could occur in the two advanced nuclear fuel cycles over 81 years beginning in 2020 and ending in 2100. Simulations projected the flows of uranium, plutonium, and minor actinides as these nuclear fuel materials were produced and consumed in a fleet of 100 1,000 MWe LWRs and in FRs. The model als

E. R. Johnson; R. E. Best

2009-12-28T23:59:59.000Z

131

First principles calculation of finite temperature magnetism in Fe and Fe3C  

SciTech Connect

Density functional calculations have proven to be a useful tool in the study of ground state properties of many materials. The investigation of finite temperature magnetism, on the other hand, has to rely usually on the usage of empirical models that allow the large number of evaluations of the systems Hamiltonian that are required to obtain the phase space sampling needed to obtain the free energy, specific heat, magnetization, susceptibility, and other quantities as function of temperature. We have demonstrated a solution to this problem that harnesses the computational power of today s large massively parallel computers by combining a classical Wang Landau Monte-Carlo calculation [F. Wang and D. P. Landau, Phys. Rev. Lett. 86, 2050 (2001)] with our first principles multiple scattering electronic structure code [Y. Wang et al., Phys. Rev. Lett. 75, 2867 (1995)] that allows the energy calculation of constrained magnetic states [M. Eisenbach et al., Proceedings of the Conference on High Performance Computing, Networking, Storage and Analysis (ACM, New York, 2009)]. We present our calculations of finite temperature properties of Fe and Fe3C using this approach and we find the Curie temperatures to be 980 and 425K, respectively. VC2011 American Institute of Physics. [doi:10.1063/1.3562218

Eisenbach, Markus [ORNL; Nicholson, Don M [ORNL; Rusanu, Aurelian [ORNL; Brown, Greg [ORNL

2011-01-01T23:59:59.000Z

132

Progress in solar thermal distributed receiver technology  

DOE Green Energy (OSTI)

The author reports the status of research on distributed receivers, which are solar thermal collectors which concentrate sunlight on an absorber and do not employ the central receiver concept. Point-focusing collectors such as the parabolic dish, line-focusing collectors such as the parabolic trough, and the fixed-mirror distributed-focus of hemispheric bowl collectors are the most common receivers. Following an overview of fundamental principals, there is a description of several installations and of the organic Rankine Cycle engine and the Solarized Automotive Gas Turbine projects. Future development will explore other types of power cycles, new materials, and other components and designs. 5 references, 6 figures.

Leonard, J.A.; Otts, J.V.

1985-08-01T23:59:59.000Z

133

The faint X-ray Source Population near 3C 295  

E-Print Network (OSTI)

We present a statistical analysis of the Chandra observation of the source field around the 3C 295 galaxy cluster (z=0.46) aimed at the search for clustering of X-ray sources. We applied three different methods of analysis, all suggesting a strong clustering in the field on scales of a few arcmin. In particular 1) the logN-logS computed separately for the four ACIS-I chips reveals that there is a significant (3.2 sigma in the 0.5-2 keV, 3.3 sigma in the 2-10 keV and 4.0 sigma in the 0.5-10 keV band) excess of sources to the North-North East and a void to the South of the central cluster. 2) the two point, two-dimensional Kolmogorov-Smirnov (KS) test, shows the probability that the sources are uniformly distributed is only a few percent. 3) a strong spatial correlation emerges from the study of the angular correlation function of the field: the angular correlation function (ACF) shows a clear signal on scales of 0.5 - 5 arcmin, correlation angle in the 0.5-7 keV band theta = 8.5^{+6.5}_{-4.5}, 90% confidence limit (assuming a power law ACF with slope gamma=1.8). This correlation angle is 2 times higher than that of a sample of 8 ACIS-I field at the 2.5 sigma confidence level. The above scales translate to 0.2 - 2 Mpc at the cluster redshift, higher than the typical cluster core radius, and more similar to the size of a ``filament'' of the large scale structure.

Valerio D'Elia; Fabrizio Fiore; Martin Elvis; Massimo Cappi; Smita Mathur; Pasquale Mazzotta; Emilio Falco; Filomena Cocchia

2004-03-17T23:59:59.000Z

134

Data:0ac74409-f2ac-4fb5-89ca-2b93352f3c66 | Open Energy Information  

Open Energy Info (EERE)

4409-f2ac-4fb5-89ca-2b93352f3c66 4409-f2ac-4fb5-89ca-2b93352f3c66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2011/03/15 End date if known: Rate name: MU-1 - a1b - 1000 watt MV Sector: Lighting Description: Lamps in enclosed fixtures, mounted on metal or fiberglass columns and supplied from underground circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking areas, or other public places by Cities or Towns or by individuals, groups of individuals, associations and other than incorporated municipalities; and lighting of public parks, drives, bridges, parking areas or other public places by only Cities or Towns where there is a prospect that the capital expenditure is warranted. The capital expenditure will be warranted if the amount of revenue received in sixty (60) months exceeds the estimated cost of installation for the lights as calculated by the Company. If the 60-month revenue does not exceed the cost of installation, the Customer must pay two and one-half (2½) times the difference of the cost of installation and the 60-month revenue prior to installation of the lighting. The terms, prices and provisions of this rate schedule shall be applicable to a consolidated city of the first class only to the extent not inconsistent with the specifications, terms, prices and provisions in contracts which may be entered into by such city pursuant to I.C. § 36-9-9-1, et. seq.

135

Data:35276a3c-abed-4b10-88aa-13ce3d186247 | Open Energy Information  

Open Energy Info (EERE)

a3c-abed-4b10-88aa-13ce3d186247 a3c-abed-4b10-88aa-13ce3d186247 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: End date if known: Rate name: Industrial- Distribution Delivery - Three Phase Sector: Industrial Description: Applies to all customers who historically meet the following criteria: 1. average greater than 50 KW monthly demand per year, or 2. have a monthly demand greater than 100 KW two or more times per year, or 3. require service to an irrigation site. Load Management Options - Two options are available to C/I customers who wish to lower their coincidental demand charges by participating in the Load Management Program. 1. Full load management - Under full load management, the customer is expected to curtail load during all hours of load management. Under this option, the customer can avoid all seasonal coincidental demand charges. 2. Incremental pricing - Customers also have the option of purchasing energy during certain control periods. Nodak will provide a signal at the load management receiver indicating whether or not incremental energy is available. The customer is responsible to monitor the load management system status. If the customer chooses to operate through periods when incremental energy is available, coincidental demand charges will not accrue; however, an incremental adder will be charged for each kilowatt-hour consumed during those hours. These charges are as follows: Irrigation incremental adder up to *$0.12/Kwh All other C/I accounts incremental adder up to *$0.095/Kwh

136

Data:5617ac0e-3c6b-40ad-a852-daee53a7a636 | Open Energy Information  

Open Energy Info (EERE)

ac0e-3c6b-40ad-a852-daee53a7a636 ac0e-3c6b-40ad-a852-daee53a7a636 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: End date if known: Rate name: Commercial - Distribution Delivery - Three Phase Sector: Commercial Description: Applies to all customers who historically meet the following criteria: 1. average greater than 50 KW monthly demand per year, or 2. have a monthly demand greater than 100 KW two or more times per year, or 3. require service to an irrigation site. Load Management Options - Two options are available to C/I customers who wish to lower their coincidental demand charges by participating in the Load Management Program. 1. Full load management - Under full load management, the customer is expected to curtail load during all hours of load management. Under this option, the customer can avoid all seasonal coincidental demand charges. 2. Incremental pricing - Customers also have the option of purchasing energy during certain control periods. Nodak will provide a signal at the load management receiver indicating whether or not incremental energy is available. The customer is responsible to monitor the load management system status. If the customer chooses to operate through periods when incremental energy is available, coincidental demand charges will not accrue; however, an incremental adder will be charged for each kilowatt-hour consumed during those hours. These charges are as follows: Irrigation incremental adder up to *$0.12/Kwh All other C/I accounts incremental adder up to *$0.095/Kwh

137

Impact of Aerosols on Atmospheric Attenuation Loss in Central Receiver Systems: Preprint  

Science Conference Proceedings (OSTI)

Atmospheric attenuation loss between the heliostat field and receiver has been recognized as a significant source of loss in Central Receiver Systems. In clear sky situations, extinction of Direct Normal Irradiance (DNI) is primarily by aerosols in the atmosphere. When aerosol loading is high close to the surface the attenuation loss between heliostat and receivers is significantly influenced by the amount of aerosols present on a particular day. This study relates measured DNI to aerosol optical depths close to the surface of the earth. The model developed in the paper uses only measured DNI to estimate the attenuation between heliostat and receiver in a central receiver system. The requirement that only a DNI measurement is available potentially makes the model a candidate for widespread use.

Sengupta, M.; Wagner, M. J.

2011-08-01T23:59:59.000Z

138

WIPP Receives Top Mine Safety Award  

NLE Websites -- All DOE Office Websites (Extended Search)

September 18, 2013 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top safety honors from the New Mexico Bureau of Mine Safety (BMS) and the New...

139

Atmospheric considerations for central receiver power plants  

DOE Green Energy (OSTI)

This report documents the results of a study of the effects of atmospheric attenuation, turbulent scattering, and the use of cooling towers on the performance of solar thermal central receiver power plants.

Henderson, R.G.; Pitter, R.L.

1979-06-01T23:59:59.000Z

140

One Video Stream to Serve Diverse Receivers  

E-Print Network (OSTI)

The fundamental problem of wireless video multicast is to scalably serve multiple receivers which may have very different channel characteristics. Ideally, one would like to broadcast a single stream that allows each ...

Woo, Grace

2008-10-18T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EM Field Office Manager Receives Military Honor  

Energy.gov (U.S. Department of Energy (DOE))

EM Carlsbad Field Office (CBFO) Manager Joe Franco receives the Employer Support of the Guard and Reserve (ESGR) Seven Seals Award in June at a ESGR recognition event in Carlsbad, N.M.

142

A handbook for solar central receiver design  

DOE Green Energy (OSTI)

This Handbook describes central receiver technology for solar thermal power plants. It contains a description and assessment of the major components in a central receiver system configured for utility scale production of electricity using Rankine-cycle steam turbines. It also describes procedures to size and optimize a plant and discussed examples from recent system analyses. Information concerning site selection criteria, cost estimation, construction, and operation and maintenance is also included, which should enable readers to perform design analyses for specific applications.

Falcone, P.K.

1986-12-01T23:59:59.000Z

143

Los Alamos National Laboratory employees receive Pollution Prevention...  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees receive Pollution Prevention awards Los Alamos National Laboratory employees receive Pollution Prevention awards Nearly 400 employees on 47 teams received Pollution...

144

Los Alamos National Laboratory employees receive Pollution Prevention...  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees Receive Pollution Prevention Awards Los Alamos National Laboratory employees receive Pollution Prevention Awards Nearly 400 employees on 47 teams received Pollution...

145

Low-temperature volumetric receiver concept  

SciTech Connect

This document describes an alternative solar central receiver concept that offers the potential for a substantial reduction in the cost of electrical energy. The concept consists of a low temperature volumetric receiver which supplies 1100/degree/F air to a Kalina cycle heat engine. Hot air can also be supplied to a packed bed of Dresser basalt where the hot air is used to heat the bed. The thermal energy stored in the bed can be extracted and supplied to the Kalina cycle during periods of low insolation. Previous investigations of the volumetric receiver concentrated on high temperature applications. The results showed that the volumetric concept could be very efficient, but the receiver was expensive and there were significant technical problems. Areas of technical uncertainty included fiber durability, the feasibility of inducing a preswirl and cost effective applications. The use of the volumetric receiver to produce low temperature will avoid the problems identified in the high temperature studies. The attractiveness of the low temperature concept is enhanced by the availability of the Kalina cycle. This heat engine was developed as a bottoming cycle for Brayton and Rankine cycle power plants. The key feature of the Kalina cycle is its ability to efficiently utilize the energy in a relatively low temperature heat source. The combination of the low temperature volumetric receiver and the Kalina cycle is particularly interesting. 7 refs., 2 figs., 3 tabs.

Drost, M.K.

1988-09-01T23:59:59.000Z

146

The Effect of Grain Size and Phosphorous-doping of Polycrystalline 3C-SiC on Infrared Reflectance Spectra  

SciTech Connect

The effect of P-doping and grain size of polycrystalline 3C-SiC on the infrared reflectance spectra is reported. The relationship between grain size and full width at half maximum (FWHM) suggest that the behaviour of the 3C-SiC with the highest phosphorous doping level (of 1.2 x 10{sup 19} at. cm{sup -3}) is different from those with lower doping levels (< 6.6 x 10{sup 18} at. cm{sup -3}). It is also further demonstrated that the plasma resonance frequency (w{sub p}) is not influenced by the grain size.

I. J. van Rooyen; J. A. A. Engelbrecht; A. Henry; E. Janzen; J. H. Neethling; P. M. van Rooyen

2012-03-01T23:59:59.000Z

147

Optical keyboard  

DOE Patents (OSTI)

An optical keyboard includes an optical panel having optical waveguides stacked together. First ends of the waveguides define an inlet face, and opposite ends thereof define a screen. A projector transmits a light beam outbound through the waveguides for display on the screen as a keyboard image. A light sensor is optically aligned with the inlet face for sensing an inbound light beam channeled through the waveguides from the screen upon covering one key of the keyboard image.

Veligdan, James T. (Manorville, NY); Feichtner, John D. (Fiddletown, CA); Phillips, Thomas E. (San Diego, CA)

2001-01-01T23:59:59.000Z

148

Fiber optic spectroscopic digital imaging sensor and method for flame properties monitoring  

DOE Patents (OSTI)

A system for real-time monitoring of flame properties in combustors and gasifiers which includes an imaging fiber optic bundle having a light receiving end and a light output end and a spectroscopic imaging system operably connected with the light output end of the imaging fiber optic bundle. Focusing of the light received by the light receiving end of the imaging fiber optic bundle by a wall disposed between the light receiving end of the fiber optic bundle and a light source, which wall forms a pinhole opening aligned with the light receiving end.

Zelepouga, Serguei A. (Hoffman Estates, IL); Rue, David M. (Chicago, IL); Saveliev, Alexei V. (Chicago, IL)

2011-03-15T23:59:59.000Z

149

Optical high acidity sensor  

DOE Patents (OSTI)

An apparatus and method for determining acid concentrations in solutions having acid concentrations of from about 0.1 Molar to about 16 Molar is disclosed. The apparatus includes a chamber for interrogation of the sample solution, a fiber optic light source for passing light transversely through the chamber, a fiber optic collector for receiving the collimated light after transmission through the chamber, a coating of an acid resistant polymeric composition upon at least one fiber end or lens, the polymeric composition in contact with the sample solution within the chamber and having a detectable response to acid concentrations within the range of from about 0.1 Molar to about 16 Molar, a measurer for the response of the polymeric composition in contact with the sample solution, and a comparer of the measured response to predetermined standards whereby the acid molarity of the sample solution within the chamber can be determined. Preferably, a first lens is attached to the end of the fiber optic light source, the first lens adapted to collimate light from the fiber optic light source, and a second lens is attached to the end of the fiber optic collector for focusing the collimated light after transmission through the chamber. 10 figs.

Jorgensen, B.S.; Nekimken, H.L.; Carey, W.P.; O`Rourke, P.E.

1997-07-22T23:59:59.000Z

150

Optical high acidity sensor  

DOE Patents (OSTI)

An apparatus and method for determining acid concentrations in solutions having acid concentrations of from about 0.1 Molar to about 16 Molar is disclosed. The apparatus includes a chamber for interrogation of the sample solution, a fiber optic light source for passing light transversely through the chamber, a fiber optic collector for receiving the collimated light after transmission through the chamber, a coating of an acid resistant polymeric composition upon at least one fiber end or lens, the polymeric composition in contact with the sample solution within the chamber and having a detectable response to acid concentrations within the range of from about 0.1 Molar to about 16 Molar, a measurer for the response of the polymeric composition in contact with the sample solution, and, a comparer of the measured response to predetermined standards whereby the acid molarity of the sample solution within the chamber can be determined. Preferably, a first lens is attached to the end of the fiber optic light source, the first lens adapted to collimate light from the fiber optic light source, and a second lens is attached to the end of the fiber optic collector for focusing the collimated light after transmission through the chamber.

Jorgensen, Betty S. (Jemez Springs, NM); Nekimken, Howard L. (Los Alamos, NM); Carey, W. Patrick (Lynnwood, WA); O' Rourke, Patrick E. (Martinez, GA)

1997-01-01T23:59:59.000Z

151

Optical key system  

Science Conference Proceedings (OSTI)

An optical key system comprises a battery-operated optical key and an isolated lock that derives both its operating power and unlock signals from the correct optical key. A light emitting diode or laser diode is included within the optical key and is connected to transmit a bit-serial password. The key user physically enters either the code-to-transmit directly, or an index to a pseudorandom number code, in the key. Such person identification numbers can be retained permanently, or ephemeral. When a send button is pressed, the key transmits a beam of light modulated with the password information. The modulated beam of light is received by a corresponding optical lock with a photovoltaic cell that produces enough power from the beam of light to operate a password-screen digital logic. In one application, an acceptable password allows a two watt power laser diode to pump ignition and timing information over a fiberoptic cable into a sealed engine compartment. The receipt of a good password allows the fuel pump, spark, and starter systems to each operate. Therefore, bypassing the lock mechanism as is now routine with automobile thieves is pointless because the engine is so thoroughly disabled.

Hagans, K.G.; Clough, R.E.

2000-04-25T23:59:59.000Z

152

Optical key system  

DOE Patents (OSTI)

An optical key system comprises a battery-operated optical key and an isolated lock that derives both its operating power and unlock signals from the correct optical key. A light emitting diode or laser diode is included within the optical key and is connected to transmit a bit-serial password. The key user physically enters either the code-to-transmit directly, or an index to a pseudorandom number code, in the key. Such person identification numbers can be retained permanently, or ephemeral. When a send button is pressed, the key transmits a beam of light modulated with the password information. The modulated beam of light is received by a corresponding optical lock with a photovoltaic cell that produces enough power from the beam of light to operate a password-screen digital logic. In one application, an acceptable password allows a two watt power laser diode to pump ignition and timing information over a fiberoptic cable into a sealed engine compartment. The receipt of a good password allows the fuel pump, spark, and starter systems to each operate. Therefore, bypassing the lock mechanism as is now routine with automobile thieves is pointless because the engine is so thoroughly disabled.

Hagans, Karla G. (Livermore, CA); Clough, Robert E. (Danville, CA)

2000-01-01T23:59:59.000Z

153

Fiber optic hydrogen sensor  

DOE Patents (OSTI)

Apparatus and method for detecting a chemical substance by exposing an optic fiber having a core and a cladding to the chemical substance so that the chemical substance can be adsorbed onto the surface of the cladding. The optic fiber is coiled inside a container having a pair of valves for controlling the entrance and exit of the substance. Light from a light source is received by one end of the optic fiber, preferably external to the container, and carried by the core of the fiber. Adsorbed substance changes the transmissivity of the fiber as measured by a spectrophotometer at the other end, also preferably external to the container. Hydrogen is detected by the absorption of infrared light carried by an optic fiber with a silica cladding. Since the adsorption is reversible, a sensor according to the present invention can be used repeatedly. Multiple positions in a process system can be monitored using a single container that can be connected to each location to be monitored so that a sample can be obtained for measurement, or, alternatively, containers can be placed near each position and the optic fibers carrying the partially-absorbed light can be multiplexed for rapid sequential reading, by a single spectrophotometer.

Buchanan, B.R.; Prather, W.S.

1991-01-01T23:59:59.000Z

154

Dish/stirling hybrid-receiver  

DOE Green Energy (OSTI)

A hybrid high-temperature solar receiver is provided which comprises a solar heat-pipe-receiver including a front dome having a solar absorber surface for receiving concentrated solar energy, a heat pipe wick, a rear dome, a sidewall joining the front and the rear dome, and a vapor and a return liquid tube connecting to an engine, and a fossil fuel fired combustion system in radial integration with the sidewall for simultaneous operation with the solar heat pipe receiver, the combustion system comprising an air and fuel pre-mixer, an outer cooling jacket for tangentially introducing and cooling the mixture, a recuperator for preheating the mixture, a burner plenum having an inner and an outer wall, a porous cylindrical metal matrix burner firing radially inward facing a sodium vapor sink, the mixture ignited downstream of the matrix forming combustion products, an exhaust plenum, a fossil-fuel heat-input surface having an outer surface covered with a pin-fin array, the combustion products flowing through the array to give up additional heat to the receiver, and an inner surface covered with an extension of the heat-pipe wick, a pin-fin shroud sealed to the burner and exhaust plenums, an end seal, a flue-gas diversion tube and a flue-gas valve for use at off-design conditions to limit the temperature of the pre-heated air and fuel mixture, preventing pre-ignition.

Mehos, Mark S. (Boulder, CO); Anselmo, Kenneth M. (Arvada, CO); Moreno, James B. (Albuquerque, NM); Andraka, Charles E. (Albuquerque, NM); Rawlinson, K. Scott (Albuquerque, NM); Corey, John (Melrose, NY); Bohn, Mark S. (Golden, CO)

2002-01-01T23:59:59.000Z

155

A Comparative Study of the Structure and Energetics of Elementary Defects in 3C- and 4H-SiC  

DOE Green Energy (OSTI)

The potential non-equivalent defects in both 3C- and 4H-SiC are classified by a new method that is based on symmetry considerations. In 4H-SiC, their number is considerably higher than in 3C-SiC, since the hexagonal symmetry leads to diversification. The different theoretical methods hitherto used to investigate defects in 3C-SiC are critically reviewed. Classical MD simulations with a recently developed interatomic potential are employed to investigate the stability, structure and energetics of the large number of potential non-equivalent defects that may exist in 4H-SiC. Most of the potential defects in 4H-SiC are found to be stable. The interstitials between hexagonal and trigonal rings, which do not exist in 3C-SiC, are characteristic for 4H-SiC and other hexagonal polytypes. The structure and energetics of some complex and anisotropic dumbbells depend strongly on the polytype. On the other hand, polytypism does not have a significant influence on the properties of the more compact and isotropic defects, such as vacancies, antisites, hexagonal interstitials, and many dumbbells. The results allow conclusions to be drawn about the energy hierarchy of the defects.

Posselt, Matthias; Gao, Fei; Weber, William J.; Belko, V

2004-03-03T23:59:59.000Z

156

Mudundi R. Raju receives Padma Shri award  

NLE Websites -- All DOE Office Websites (Extended Search)

Mudundi R. Raju receives Padma Shri award Mudundi R. Raju receives Padma Shri award Mudundi R. Raju receives Padma Shri award The government of India honored Mudundi Raju for his distinguished service in science and engineering, providing cancer radiation treatment to the poor of rural India. July 18, 2013 President of India Pranab Mukherjee presents the Padma Shri award to former Los Alamos National Laboratory scientist Mudundi Raju. President of India Pranab Mukherjee presents the Padma Shri award to former Los Alamos National Laboratory scientist Mudundi Raju. Contact Nancy Ambrosiano Communications Office (505) 667-0471 Email "The aim of science is to improve the human condition," said Nobel Laureate Ilya Prigogine, and Raju has taken this statement to heart. Los Alamos retiree brings medical advances to poor of India

157

Windowed versus windowless solar energy cavity receivers  

DOE Green Energy (OSTI)

A model for a windowed, high-temperature cavity receiver of the heated-air type is developed and used to evaluate the greenhouse effect as a method for obtaining high receiver operating efficiencies. The effects on receiver efficiency of varying the window cutoff wavelength, the amount of absorption in the window pass-band, the cavity operating temperature, and the number of windows are determined. Single windowed cavities are found to offer theoretical efficiencies comparable to windowless ones, while multiple windowed units are found to suffer from low operating efficiencies due to losses resulting from reflections at each window/air interface. A ''first order'' examination is made of the feasibility of air cooling the window to assure its survival. This appears possible if a proper combination of cooling technique and window material characteristics is selected.

Jarvinen, P. O.

1976-09-01T23:59:59.000Z

158

Solar Heat-Pipe Receiver Wick Modeling  

DOE Green Energy (OSTI)

Stirling-cycle engines have been identified as a promising technology for the conversion of concentrated solar energy into usable electrical power. In previous experimented work, we have demonstrated that a heat pipe receiver can significantly improve system performance-over a directly-illuminated heater head. The design and operating conditions of a heat pipe receiver differ significantly from typical laboratory heat pipes. New wick structures have been developed to exploit the characteristics of the solar generation system. Typically, these wick structures allow vapor generation within the wick. Conventional heat pipe models do not handle this enhancement yet it can more than double the performance of the wick. In this study, I develop a steady-state model of a boiling-enhanced wick for a solar heat pipe receiver. The model is used for design-point calculations and is written in FORTRAN90. Some limited comparisons have been made with actual test data.

Andraka, C.E.

1998-12-21T23:59:59.000Z

159

LM Receives Sustainability Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Receives Sustainability Award Receives Sustainability Award LM Receives Sustainability Award January 8, 2013 - 1:17pm Addthis Award ceremony (left to right): Melvin G. Williams, Jr., Associate Deputy Secretary, U.S. Department of Energy (DOE); Mary Sizemore, Environmental Management System (EMS) Coordinator, Office of Legacy Management (LM) contractor; Tracy Ribeiro, EMS Coordinator, LM; Tom Pauling, Director of Site Operations, LM; Dave Geiser, Director, LM; and Jennifer MacDonald, Director, Sustainability Performance Office, DOE. Award ceremony (left to right): Melvin G. Williams, Jr., Associate Deputy Secretary, U.S. Department of Energy (DOE); Mary Sizemore, Environmental Management System (EMS) Coordinator, Office of Legacy Management (LM) contractor; Tracy Ribeiro, EMS Coordinator, LM; Tom Pauling, Director of

160

High temperature, minimally invasive optical sensing modules  

DOE Patents (OSTI)

A remote temperature sensing system includes a light source selectively producing light at two different wavelengths and a sensor device having an optical path length that varies as a function of temperature. The sensor receives light emitted by the light source and redirects the light along the optical path length. The system also includes a detector receiving redirected light from the sensor device and generating respective signals indicative of respective intensities of received redirected light corresponding to respective wavelengths of light emitted by the light source. The system also includes a processor processing the signals generated by the detector to calculate a temperature of the device.

Riza, Nabeel Agha (Oviedo, FL); Perez, Frank (Tujunga, CA)

2008-02-05T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:71b4e2d3-5b7f-491e-b3c7-3d96090e7144 | Open Energy Information  

Open Energy Info (EERE)

-5b7f-491e-b3c7-3d96090e7144 -5b7f-491e-b3c7-3d96090e7144 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Kittitas County Effective date: 2013/02/01 End date if known: Rate name: Residential Net Metering Service Sector: Residential Description: Available to farms and single family residences for customers with a solar, wind turbine or micro-hydro generating facility, or a hybrid system of one or more types, with a total rated capacity of not more than 25 kW. Customers are billed monthly the "Net" kWh or the difference between the energy delivered and the energy received for the month. During any month where energy received from the customer exceeds the energy deliver, the excess may be stored in a bank of kWh s. In April of each year, this bank is reset to zero. Any balance of kWh left in the bank will be used to offset any previously billed kWh delivered. Excess kWh will be forfeited to the district.

162

Precision-analog fiber-optic transmission system  

SciTech Connect

This article describes the design, experimental development, and construction of a DC-coupled precision analog fiber optic link. Topics to be covered include overall electrical and mechanical system parameters, basic circuit organization, modulation format, optical system design, optical receiver circuit analysis, and the experimental verification of the major design parameters.

Stover, G.

1981-06-01T23:59:59.000Z

163

Prepaid Services Full-time students receive  

E-Print Network (OSTI)

with a medical provider · Unlimited nutritional consultations with RD #12;Prepaid Services · Health education for student only #12;PUSH Services Allergy and Immunizations Laboratory Radiology Physical Therapy Sports#12;Prepaid Services Full-time students receive: · Unlimited visits to medical clinic to consult

Holland, Jeffrey

164

Solar Central Receiver with an Irising Aperture  

E-Print Network (OSTI)

Variable sun elevation, azimuthal and declination angles with the time of day, and seasons of the year respectively, give variable projected image size defects produced by field site concave mirrors on the central cavity receiver's aperture entrance. If the aperture is small, it will be inefficient for periods when the solar isolation is inclined due to spillage. However, if the aperture is large, it will be inefficient for periods when the solar isolation is normal, due to excess heat radiation and convection losses. Thus, the fixed aperture area size is a compromise between ideal sizes for different conditions. The end result is a loss of efficiency as a function of time of day and seasons of the year. This research presents an approach to maximize the interception factor on the receiver entrance, with reducing the heat losses by radiation and convection through its aperture area. A central receiver system, having a down-looking cavity with an irises aperture is being proposed for application in rich environmental solar conditions, utilized solar flux insolation throughout the day on the city of Kuwait. Solar tower focusing collector with a cavity type receiver having a fixed area aperture at the entrance is presented for comparison with the proposed technique. This collector is proved to be less efficient than the suggested design. The isiring cavity receiver with a variable area aperture provides an approximately constant efficiency regardless of the time of day or season of the year. The end result is the proposed system shows improved performance and capability. However, over the life-time of installation these advantages of the proposed system should overweigh its disadvantages of additional cost due to extra automation.

Galal, T.; Kulaib, A. M.; Abuzaid, M.

2010-01-01T23:59:59.000Z

165

OPTICS 5  

NLE Websites -- All DOE Office Websites (Extended Search)

OPTICS (Version 5.1.02) OPTICS (Version 5.1.02) Release notes NOTE: See the Optics Knowledge Base for how to run this version of Optics on the Microsoft Vista and Microsoft Windows 7 operating systems March 5, 2003: Release Maintenance Pack 2 New ! January 7, 2003: Release Maintenance Pack 1 October 23, 2002: Release Optics 5.1.01 September 27, 2002: Release Optics 5.1.00 (only released on CDs at NFRC Annual Fall Meeting) Release notes Maintenance Pack 2 Bug fixes: New features: bullet Applied films that were created could not be saved or exported. This has been fixed. bullet Exporting glazing systems generated a message that the operation failed because the glazing system type is unknown. Glazing systems can now be exported to file (e.g. to view the spectral data), but the structure information will be lost.

166

Optical engineering  

SciTech Connect

The Optical Engineering thrust area at Lawrence Livermore National Laboratory (LLNL) was created in the summer of 1996 with the following main objectives: (1) to foster and stimulate leading edge optical engineering research and efforts key to carrying out LLNL's mission and enabling major new programs; (2) to bring together LLNL's broad spectrum of high level optical engineering expertise to support its programs. Optical engineering has become a pervasive and key discipline, with applications across an extremely wide range of technologies, spanning the initial conception through the engineering refinements to enhance revolutionary application. It overlaps other technologies and LLNL engineering thrust areas.

Saito, T T

1998-01-01T23:59:59.000Z

167

Data:87978379-5878-473a-9e17-aaf0f3c0890f | Open Energy Information  

Open Energy Info (EERE)

8379-5878-473a-9e17-aaf0f3c0890f 8379-5878-473a-9e17-aaf0f3c0890f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Small Power Service - More than 100kW -Primary Metering Discount Sector: Commercial Description: Application: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 100 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

168

Data:159106d9-928f-4116-b89c-5feb3c199290 | Open Energy Information  

Open Energy Info (EERE)

d9-928f-4116-b89c-5feb3c199290 d9-928f-4116-b89c-5feb3c199290 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bailey County Elec Coop Assn Effective date: 2004/03/01 End date if known: Rate name: Outdoor Lighting 175 W MV Sector: Lighting Description: Plus $1.00 per month for each extra pole required Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

169

Data:84fdc56e-3253-4761-baac-bd3c5c7957ca | Open Energy Information  

Open Energy Info (EERE)

fdc56e-3253-4761-baac-bd3c5c7957ca fdc56e-3253-4761-baac-bd3c5c7957ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: General Service - Municipal (Rate Code 45) Single Phase Sector: Commercial Description: Applicable to miscellaneous municipal services (excluding municipal pumping), school districts, and other non-federal agencies, which are principally tax supported. Source or reference: http://www.perennialpower.com/Images/URBAN_GENERAL_AND_PUBLIC_SERVICE.pdf Source Parent: Comments Applicability Demand (kW)

170

Data:0b37e540-ab3c-420e-882e-aec532313539 | Open Energy Information  

Open Energy Info (EERE)

e540-ab3c-420e-882e-aec532313539 e540-ab3c-420e-882e-aec532313539 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: High Load Factor - Primary Direct Sector: Industrial Description: Availability Available to any customer contracting for a specified capacity of not less than 25 kW. Applicant must be located adjacent to an electric transmission or distribution line of Company that is adequate and suitable for supplying the service requested. Character of Service Alternating current having a frequency of sixty Hertz and furnished in accordance with the provisions set forth hereunder.

171

Data:16e3a087-a3df-4bd4-bcd3-c9944339aebb | Open Energy Information  

Open Energy Info (EERE)

a087-a3df-4bd4-bcd3-c9944339aebb a087-a3df-4bd4-bcd3-c9944339aebb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2006/02/01 End date if known: Rate name: Irrigation -Large 30 KW or greater Sector: Commercial Description: The type of service provided under this schedule is three phase, at secondary or primary voltage and supplied through one meter at one point of delivery. If service is provided at primary voltage, the contract for service shall specify the point of delivery, establish all metering costs to be paid by the member, and delineate ownership and control of such facilities.

172

Data:522e48ec-3c94-4379-9090-c7b153004cb1 | Open Energy Information  

Open Energy Info (EERE)

ec-3c94-4379-9090-c7b153004cb1 ec-3c94-4379-9090-c7b153004cb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Joe Wheeler Elec Member Corp Effective date: 2013/05/01 End date if known: Rate name: Manufacturing Service Rate--Schedule SMSD Sector: Industrial Description: This rate shall apply to the firm electric power requirements where (a) a customer's currently effective contract demand is greater than 25,000 kW. Source or reference: http://www.jwemc.org/rateforms.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

173

Data:078aeccf-7853-4919-9494-1da67fff6a3c | Open Energy Information  

Open Energy Info (EERE)

aeccf-7853-4919-9494-1da67fff6a3c aeccf-7853-4919-9494-1da67fff6a3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2010/07/09 End date if known: Rate name: 2 Lightinhg service to existing instalation only - schedule SHL - Fluorescent - 400W Sector: Lighting Description: This rate schedule is applicable under the regular terms and conditions of Company to Street and Highway Lighting Service, Area Lighting Service, and Residential Subdivision Lighting (existing installations or extensions thereof) only. This rate is not applicable to new installations.

174

Data:889670c3-c5fd-4410-ad59-f90d746d2387 | Open Energy Information  

Open Energy Info (EERE)

70c3-c5fd-4410-ad59-f90d746d2387 70c3-c5fd-4410-ad59-f90d746d2387 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2010/04/07 End date if known: Rate name: Industrial Small General Service (Under 25 kW) Multi-Phase Sector: Industrial Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Minimum monthly charge is $40.00 Source or reference: http://www.singingriver.com/Files/SGS%203-3.pdf Source Parent: Comments Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment

175

Data:14035438-5238-4509-8e66-7e3c2a3659df | Open Energy Information  

Open Energy Info (EERE)

8-5238-4509-8e66-7e3c2a3659df 8-5238-4509-8e66-7e3c2a3659df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bailey County Elec Coop Assn Effective date: 2004/03/01 End date if known: Rate name: Outdoor Lighting 400 W MV Sector: Lighting Description: Plus $1.00 per month for each extra pole required Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

176

Data:1844e12d-12a3-4722-a554-be3c170bffaa | Open Energy Information  

Open Energy Info (EERE)

e12d-12a3-4722-a554-be3c170bffaa e12d-12a3-4722-a554-be3c170bffaa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Tariff A1: Single Phase Residential, Greater Than 200 Amps and Less Than 400 Amps Sector: Residential Description: The charges derived in the Tariff A1 rate are subject to adjustment for: Purchased Power Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

177

Data:5308e208-308c-4389-8459-3c342933daa3 | Open Energy Information  

Open Energy Info (EERE)

8-308c-4389-8459-3c342933daa3 8-308c-4389-8459-3c342933daa3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2011/01/01 End date if known: Rate name: SEA04 Sector: Commercial Description: Source or reference: http://www.adamsec.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

178

Data:8fa56be7-cd3c-4384-ae40-815057fb723b | Open Energy Information  

Open Energy Info (EERE)

be7-cd3c-4384-ae40-815057fb723b be7-cd3c-4384-ae40-815057fb723b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(MULT GLOBE 70W HPS-Option E) Sector: Lighting Description: Customer-100% Cooperative-0% Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

179

Data:09765641-d802-4897-b864-961aced23a3c | Open Energy Information  

Open Energy Info (EERE)

641-d802-4897-b864-961aced23a3c 641-d802-4897-b864-961aced23a3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: La Farge Municipal Electric Co Effective date: 2009/03/20 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 150 HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0551 per kilowatt-hour.

180

Data:96f55a3c-8bfe-4647-a799-9636828f370d | Open Energy Information  

Open Energy Info (EERE)

5a3c-8bfe-4647-a799-9636828f370d 5a3c-8bfe-4647-a799-9636828f370d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 2011/09/01 End date if known: Rate name: Street Lighting Service - 400 W HPS Sector: Lighting Description: The CBPU furnishes, installs and owns the entire equipment including poles, overhead lines, supply equipment, luminaries, supporting brackets, suspension cables, lamps and control equipment. The CBPU supplies the energy, replaces luminaries and lamps and maintains the entire equipment. Source or reference: http://www.coldwater.org/Content/Utility_General_Info.html

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Optical humidity sensor  

DOE Patents (OSTI)

An optical dielectric humidity sensor is disclosed which includes a dielectric mirror having multiple alternating layers of two porous water-adsorbent dielectric materials with differing indices of refraction carried by a translucent substrate. A narrow-band polarized light source is positioned to direct light energy onto the mirror, and detectors are positioned to receive light energy transmitted through and reflected by the mirror. A ratiometer indicates humidity in the atmosphere which surrounds the dielectric mirror as a function of a ratio of light energies incident on the detectors. 2 figs.

Tarvin, J.A.

1987-02-10T23:59:59.000Z

182

Optical humidity sensor  

SciTech Connect

An optical dielectric humidity sensor which includes a dielectric mirror having multiple alternating layers of two porous water-adsorbent dielectric materials with differing indices of refraction carried by a translucent substrate. A narrow-band polarized light source is positioned to direct light energy onto the mirror, and detectors are positioned to receive light energy transmitted through and reflected by the mirror. A ratiometer indicates humidity in the atmosphere which surrounds the dielectric mirror as a function of a ratio of light energies incident on the detectors.

Tarvin, Jeffrey A. (Ann Arbor, MI)

1987-01-01T23:59:59.000Z

183

ICCS questions received by March 19, 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

questions received by March 19, 2010 questions received by March 19, 2010 1. Is property tax on land or equipment directly attributable to the project eligible for cost share? 2. Is insurance, with coverage comparable to that purchased for similar projects, eligible for cost share (construction and operating)? Response: The answer to both questions is yes. The specific cost principle that the Applicants can go to for further information, as well as the regulations on cost sharing are given below. Question 1 - FAR Part 31.205-41, Taxes Question 2 - FAR Part 31.205-19, Insurance and Indemnification Cost Sharing regulations - 10 CFR 600.123; 10 CFR 600.224; or 10 CFR 600.313 Since both questions indicate that the costs to be incurred will be used as potential cost share for the project, additional details will be needed to verify and validate the

184

Questions Received February 17-18  

NLE Websites -- All DOE Office Websites (Extended Search)

Received February 17-18 Received February 17-18 1. I am formally requesting information on the length of the entire CCS Program. a. Is there a minimum time requirement on the Demonstration portion of the project? There is no specific minimum duration for the Demonstration Phase. However, projects will be evaluated on their ability to meet DOE's target of capture and sequestration of one million tons of CO 2 per year. Another objective of the program is to demonstrate geologic sequestration options in a variety of geologic settings in order to evaluate costs, operational processes, and technical performance. Excessively short Demonstration Phase durations will not assist DOE in meetings its objectives, and will be taken into consideration during the evaluation.

185

Central Receiver Test Facility (CRTF) experiment manual  

DOE Green Energy (OSTI)

The Central Receiver Test Facility is operated by Sandia Laboratories for the US Department of Energy. The CRTF is being used for component and subsystem evaluation within the Solar Thermal Large Power Systems Program. This experiment manual provides users of the CRTF detailed information about: (1) implementation of testing at the CRTF; (2) details of the CRTF capabilities and interfaces, and (3) requirements of experimenters.

Holmes, J. T.; Matthews, L. K.; Seamons, L. O.; Davis, D. B.; King, D. L.

1979-10-01T23:59:59.000Z

186

Radio Astronomy Software Defined Receiver Project  

SciTech Connect

The paper describes a Radio Astronomy Software Defined Receiver (RASDR) that is currently under development. RASDR is targeted for use by amateurs and small institutions where cost is a primary consideration. The receiver will operate from HF thru 2.8 GHz. Front-end components such as preamps, block down-converters and pre-select bandpass filters are outside the scope of this development and will be provided by the user. The receiver includes RF amplifiers and attenuators, synthesized LOs, quadrature down converters, dual 8 bit ADCs and a Signal Processor that provides firmware processing of the digital bit stream. RASDR will interface to a user s PC via a USB or higher speed Ethernet LAN connection. The PC will run software that provides processing of the bit stream, a graphical user interface, as well as data analysis and storage. Software should support MAC OS, Windows and Linux platforms and will focus on such radio astronomy applications as total power measurements, pulsar detection, and spectral line studies.

Vacaliuc, Bogdan [ORNL; Leech, Marcus [Shirleys Bay Radio Astronomy Consortium; Oxley, Paul [Retired; Flagg, Richard [Retired; Fields, David [ORNL

2011-01-01T23:59:59.000Z

187

Receiver control for the Submillimeter Array  

E-Print Network (OSTI)

Efficient operation of a submillimeter interferometer requires remote (preferably automated) control of mechanically tuned local oscillators, phase-lock loops, mixers, optics, calibration vanes and cryostats. The present control system for these aspects of the Submillimeter Array (SMA) will be described. Distributed processing forms the underlying architecture. In each antenna cabin, a serial network of up to ten independent 80C196 microcontroller boards attaches to the real-time PowerPC computer (running LynxOS). A multi-threaded, gcc-compiled program on the PowerPC accepts top-level requests via remote procedure calls (RPC), subsequently dispatches tuning commands to the relevant microcontrollers, and regularly reports the system status to optical-fiber-based reflective memory for common access by the telescope monitor and error reporting system. All serial communication occurs asynchronously via encoded, variable-length packets. The microcontrollers respond to the requested commands and queries by accessin...

Hunter, T R; Kimberk, R; Leiker, P S; Christensen, R D

2002-01-01T23:59:59.000Z

188

New Optical Evaluation Approach for Parabolic Trough Collectors: First-Principle OPTical Intercept Calculation  

SciTech Connect

A new analytical method -- First-principle OPTical Intercept Calculation (FirstOPTIC) -- is presented here for optical evaluation of trough collectors. It employs first-principle optical treatment of collector optical error sources and derives analytical mathematical formulae to calculate the intercept factor of a trough collector. A suite of MATLAB code is developed for FirstOPTIC and validated against theoretical/numerical solutions and ray-tracing results. It is shown that FirstOPTIC can provide fast and accurate calculation of intercept factors of trough collectors. The method makes it possible to carry out fast evaluation of trough collectors for design purposes. The FirstOPTIC techniques and analysis may be naturally extended to other types of CSP technologies such as linear-Fresnel collectors and central-receiver towers.

Zhu, G.; Lewandowski, A.

2012-11-01T23:59:59.000Z

189

VLAN-based routing infrastructure for an all-optical circuit switched LAN  

Science Conference Proceedings (OSTI)

Exploring the use of all-optical MEM switches on Local Area Network (LAN) to increase bandwidth and reduce energy cost has received increasing attention. Compared to traditional electronic switches, an all-optical switch provides higher bandwidth, less ...

Xiaolan J. Zhang; Rohit Wagle; James Giles

2009-11-01T23:59:59.000Z

190

Data:Da6e1df5-02cb-47b1-b3c5-572e8b3c35e4 | Open Energy Information  

Open Energy Info (EERE)

e1df5-02cb-47b1-b3c5-572e8b3c35e4 e1df5-02cb-47b1-b3c5-572e8b3c35e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Rg-2 Optional Time-of-Day Three Phase (8:00am-8:00pm) Sector: Residential Description: Application: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Power Cost Adjustment Clause: Charge per all kWh varies monthly. Pricing Periods: On-peak: The three on-peak periods available are: 7:00 a.m. to 7:00 p.m. 8:00 a.m. to 8:00 p.m. 9:00 a.m. to 9:00 p.m. Monday through Friday, excluding holidays, specified below. Off-peak: All times not specified as on-peak including all day Saturday and Sunday, and the following holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, or the day designated to be celebrated as such. Fixed Monthly Charge includes Commitment to Community Rider: $1.10 per customer per month

191

Fiber optics spectrochemical emission sensors  

DOE Patents (OSTI)

A method of in situ monitoring of a body of a fluid stored in a tank or groundwater or vadose zone gases in a well for the presence of selected chemical species uses a probe insertable into the well or tank via a cable and having electrical apparatus for exciting selected chemical species in the body of fluid. The probe can have a pair of electrodes for initiating a spark or a plasma cell for maintaining a plasma to excite the selected chemical species. The probe also has optical apparatus for receiving optical emissions emitted by the excited species and optically transmitting the emissions via the cable to an analysis location outside the well. The analysis includes detecting a selected wavelength in the emissions indicative of the presence of the selected chemical species. A plurality of probes can be suspended at an end of a respective cable, with the transmitting and analyzing steps for each probe being synchronized sequentially for one set of support equipment and instrumentation to monitor at multiple test points. The optical apparatus is arranged about the light guide axis so that the selected chemical species are excited the fluid in alignment with the light guide axis and optical emissions are received from the excited chemical species along such axis.

Griffin, Jeffrey W. (Kennewick, WA); Olsen, Khris B. (West Richland, WA)

1992-01-01T23:59:59.000Z

192

Inexpensive 2 to 70 MBd Fiber-Optic Solutions for Industrial, Medical,  

E-Print Network (OSTI)

systems. The fiber-optic transmit- ter and receiver circuits recommended in this publication address this low- cost fiber-optic technology into new products because no analog design is required. System engi is trans- mitted through an optical communication system, a sepa- rate fiber-optic link must be used

Berns, Hans-Gerd

193

A passion for physics, Zoe Martin, receives exposure to real...  

NLE Websites -- All DOE Office Websites (Extended Search)

for physics student receives exposure to real-world science A passion for physics, Zoe Martin, receives exposure to real-world science Physics undergraduate runs computer...

194

Chemical Scientist Hendrik Bluhm Receives Bessel Research Award  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Scientist Hendrik Bluhm Receives Bessel Research Award Chemical Scientist Hendrik Bluhm Receives Bessel Research Award Print Friday, 24 May 2013 00:00 Hendrik Bluhm of the...

195

Y-12 receives American Heart Association award | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

receives American ... Y-12 receives American Heart Association award Posted: November 22, 2012 - 9:00am Kathy Jetton, senior regional director of the American Heart Association,...

196

WIPP Receives First Shipment | National Nuclear Security Administratio...  

National Nuclear Security Administration (NNSA)

NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > WIPP Receives First Shipment WIPP Receives...

197

Pantex receives Perkins Award in recognition of its work with...  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex receives Perkins Award in recognition of ... Pantex receives Perkins Award in...

198

Sixty-seven New Mexico students receive LAESF scholarships  

NLE Websites -- All DOE Office Websites (Extended Search)

April Sixty-seven New Mexico students receive LAESF scholarships LAESF scholarships winners Taos High School senior Majdolene Khweis received this year's platinum scholarship,...

199

Advanced motor driven clamped borehole seismic receiver  

DOE Patents (OSTI)

A borehole seismic tool is described including a borehole clamp which only moves perpendicular to the borehole. The clamp is driven by an electric motor, via a right angle drive. When used as a seismic receiver, the tool has a three part housing, two of which are hermetically sealed. Accelerometers or geophones are mounted in one hermetically sealed part, the electric motor in the other hermetically sealed part, and the clamp and right angle drive in the third part. Preferably the tool includes cable connectors at both ends. Optionally a shear plate can be added to the clamp to extend the range of the tool.

Engler, B.P.; Sleefe, G.E.; Striker, R.P.

1993-02-23T23:59:59.000Z

200

Heat Transfer Analysis and Modeling of a Parabolic Trough Solar Receiver Implemented in Engineering Equation Solver  

DOE Green Energy (OSTI)

This report describes the development, validation, and use of a heat transfer model implemented in Engineering Equation Solver. The model determines the performance of a parabolic trough solar collector's linear receiver, also called a heat collector element. All heat transfer and thermodynamic equations, optical properties, and parameters used in the model are discussed. The modeling assumptions and limitations are also discussed, along with recommendations for model improvement.

Forristall, R.

2003-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Parabolic Trough Receiver Heat Loss Testing (Poster)  

DOE Green Energy (OSTI)

Parabolic trough receivers, or heat collection elements (HCEs), absorb sunlight focused by the mirrors and transfer that thermal energy to a fluid flowing within them. Thje absorbing tube of these receivers typically operates around 400 C (752 F). HCE manufacturers prevent thermal loss from the absorbing tube to the environment by using sputtered selective Cermet coatings on the absorber and by surrounding the absorber with a glass-enclosed evacuated annulus. This work quantifies the heat loss of the Solel UVAC2 and Schott PTR70 HCEs. At 400 C, the HCEs perform similarly, losing about 400 W/m of HCE length. To put this in perspective, the incident beam radiation on a 5 m mirror aperture is about 4500 W/m, with about 75% of that energy ({approx} 3400 W/m) reaching the absorber surface. Of the 3400 W/m on the absorber, about 3000 W/m is absorbed into the working fluid while 400 W/m is lost to the environment.

Price, H.; Netter, J.; Bingham, C.; Kutscher, C.; Burkholder, F.; Brandemuehl, M.

2007-03-01T23:59:59.000Z

202

DOE receives title to Great Plains plant  

Science Conference Proceedings (OSTI)

On June 30, 1986 the Great Plains Coal Gasification Project was sold at a foreclosure sale at the Mercer County courthouse in North Dakota. The US Department of Energy was the only bidder at the sale. DOE's bid for the plant was $1 billion DOE-secured loan that the five sponsor companies defaulted on when they withdrew from the project in August 1985. DOE did not receive title to the plant until a lawsuit filed by American Natural Resources (ANR) was settled on July 14, 1986. DOE has vowed to keep the plant running as long as it does not cost the taxpayers any money. Eventually DOE wishes to dispose of the plant. Therefore, in February 1986 DOE requested that interested organizations submit expressions of interest in the Great Plains plant. This paper, after discussing the lawsuit, summarizes the nine responses received by DOE. Some companies were willing for it to remain a coal gasification facility; other submitted plans for modifications to produce methanol.

Not Available

1986-09-01T23:59:59.000Z

203

Raman scattering of polycrystalline 3C-SiC film deposited on AlN buffer layer by using CVD with HMDS  

Science Conference Proceedings (OSTI)

This paper presents the Raman scattering characteristics of poly (polycrystalline) 3C-SiC thin films deposited on AlN buffer layer by atmospheric pressure chemical vapor deposition (APCVD) using hexamethyldisilane (MHDS) and carrier gases (Ar+H"2). The ... Keywords: AlN, HMDS, Poly 3C-SiC, Raman scattering

Gwiy-Sang Chung; Kang-San Kim

2008-12-01T23:59:59.000Z

204

H2 carrier gas dependence of Young's modulus and hardness of chemical vapor deposited polycrystalline 3C-SiC thin films  

Science Conference Proceedings (OSTI)

This paper presents the mechanical properties of poly (polycrystalline) 3C-SiC thin films according to 0%, 7%, and 10% carrier gas (H"2) concentrations using nano-indentation. When H"2 concentration was 10%, it has been proved that the mechanical properties, ... Keywords: AFM, Hardness, Nano-indentation, Poly 3C-SiC, Young's modulus

Gwiy-Sang Chung; Ki-Bong Han

2008-12-01T23:59:59.000Z

205

NIST Optical Radiation Group  

Science Conference Proceedings (OSTI)

Optical Radiation Group. Welcome. The Optical Radiation Group maintains, improves, and disseminates the national scales ...

2013-07-29T23:59:59.000Z

206

Receiver Architecture for 12.5 Gb/s 16-ary Pulse Position Modulation (PPM) Signaling  

SciTech Connect

PPM is a signaling scheme that enables the transmission of multiple bits per symbol [1]. It has found favor in the regime of free space optical communications ('FSO' or 'Lasercom'); however, PPM has yet to be widely applied to fiber optic-based communications. Its limitation in fiber results from the exceedingly high bandwidth requirements needed to electronically process a directly detected pulse, especially as the symbol rate increases and the pulse width correspondingly decreases. As a solution, we introduced the concept of a virtual quadrant receiver for receiving 1.25 Gb/s 4-ary PPM, where photonic processing reduced the number of required electronic components [2]. In this paper, we extend these photonic process techniques to a 16-ary, 12.5 Gb/s (10 Gb/s plus 8B/10B line coding) PPM communications system for fiber optic avionics, wherein much of the receiver processing is enabled by techniques based on planar lightwave circuits (PLCs). The architecture is applicable to higher input data rates and M-ary PPM. In the following, we present the PPM encoding and decoding architectures and numerically simulated results.

Mendez, A J; Gagliardi, R M; Hernandez, V J; Bennett, C V

2008-07-11T23:59:59.000Z

207

Integrated optical interrogation of micro-structures  

DOE Patents (OSTI)

The invention is an integrated optical sensing element for detecting and measuring changes in position or deflection. A deflectable member, such as a microcantilever, is configured to receive a light beam. A waveguide, such as an optical waveguide or an optical fiber, is positioned to redirect light towards the deflectable member. The waveguide can be incorporated into the deflectable member or disposed adjacent to the deflectable member. Means for measuring the extent of position change or deflection of the deflectable member by receiving the light beam from the deflectable member, such as a photodetector or interferometer, receives the reflected light beam from the deflectable member. Changes in the light beam are correlated to the changes in position or deflection of the deflectable member. A plurality of deflectable members can be arranged in a matrix or an array to provide one or two-dimensional imaging or sensing capabilities.

Evans, III, Boyd M. (Oak Ridge, TN); Datskos, Panagiotis G. (Knoxville, TN); Rajic, Slobodan (Knoxville, TN)

2003-01-01T23:59:59.000Z

208

Compact self-contained electrical-to-optical converter/transmitter  

DOE Patents (OSTI)

An electrical-to-optical converter/transmitter is disclosed. A first optical receiver and a second optical receiver are provided for receiving a calibrate command and a power switching signal, respectively, from a remote processor. A third receiver is provided for receiving an analog electrical signal from a transducer. A calibrator generates a reference signal in response to the calibrate command. A combiner mixes the electrical signal with the reference signal to form a calibrated signal. A converter converts the calibrated signal to an optical signal. A transmitter transmits the optical signal to the remote processor. A primary battery supplies power to the calibrator, the combiner, the converter, and the transmitter. An optically-activated switch supplies power to the calibrator, the combiner, the converter, and the transmitter in response to the power switching signal. An auxiliary battery supplies power continuously to the switch means.

Seligmann, D.A.; Moss, W.C.; Valk, T.C.; Conder, A.D.

1992-12-31T23:59:59.000Z

209

Data:047af524-6763-42fe-8762-3c91b426c727 | Open Energy Information  

Open Energy Info (EERE)

24-6763-42fe-8762-3c91b426c727 24-6763-42fe-8762-3c91b426c727 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2013/01/01 End date if known: Rate name: SECOND RESIDENTIAL SERVICE RATE SCHEDULE 12E Sector: Residential Description: This schedule is available in all territory served by the District, for a second electric service to a single parcel of land which is primarily classified as a single-family residence. The second service will be fed from the same transformer that serves the primary residence. Examples include: services to garages, workshops and to domestic water wells under five horsepower serving a single parcel of land. The service shall not be used to serve buildings that are used as a commercial business, under a landlord agreement, as a separate residence on the same property, or to serve water wells that serve more than one parcel of land.

210

Data:2144b30d-9241-4396-b86a-3c8652781070 | Open Energy Information  

Open Energy Info (EERE)

0d-9241-4396-b86a-3c8652781070 0d-9241-4396-b86a-3c8652781070 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2013/04/15 End date if known: Rate name: (RATE SCHEDULE 8: ELECTRIC HEAT)OPTIONAL SERVICE - THREE-PHASE Sector: Commercial Description: This rate schedule is available upon application to any member/owner who has permanently installed facilities using electricity either as the primary source of energy for space and water heating, or as electric resistance, low-temperature grain drying and for all other uses, including lighting and power, subject to the established rules and regulations of the Cooperative. A premises may qualify for this rate if the electric heating system is used for over 75 percent of the heating load at the premises. This rate is applicable to loads requiring 225 kVA or less of transformer capacity. Three-phase service requiring more than 225 kVA of transformer capacity shall be provided under the Cooperative's Rate Schedule for Large Power Service. The Cooperative shall be the sole and final authority in determining applicability of this rate to an account. The availability of this rate is extended to all member/owners previously served under Rate Schedule 6.

211

Data:77230dd5-1537-4479-b746-9d40b3c36611 | Open Energy Information  

Open Energy Info (EERE)

dd5-1537-4479-b746-9d40b3c36611 dd5-1537-4479-b746-9d40b3c36611 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

212

Data:1eea6481-1640-416f-9596-3c72483cb49e | Open Energy Information  

Open Energy Info (EERE)

eea6481-1640-416f-9596-3c72483cb49e eea6481-1640-416f-9596-3c72483cb49e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: GSD-Dynamic Pricing Pilot Sector: Commercial Description: The Dynamic Pricing Pilot is a voluntary pilot available at the discretion of the Company to Full Service Customers taking service under the Company's GSD tariff and whom have, or are selected to have, the required metering equipment and infrastructure installed. Customer eligibility to participate in this pilot is determined solely by the Company. The Company will furnish, install, maintain and own the required equipment at the customers' premises at the Company's expense for the

213

Fluorine for Hydrogen Exchange in the Hydrofluorobenzene Derivatives C6HxF(6-x), where x = 2, 3, 4 and 5 by Monomeric [1,2,4-(Me3C)3C5H2]2CeH; The Solid State Isomerization of [1,2,4-(Me3C)3C5H2]2Ce(2,3,4,5-C6HF4) to [1,2,4-(Me3C)3C5H2]2Ce(2,3,4,6-C6HF4)  

DOE Green Energy (OSTI)

The reaction between monomeric bis(1,2,4-tri-t-butylcyclopentadienyl)cerium hydride, Cp'2CeH, and several hydrofluorobenzene derivatives is described. The aryl derivatives that are the primary products, Cp'2Ce(C6H5-xFx) where x = 1,2,3,4, are thermally stable enough to be isolated in only two cases, since all of them decompose at different rates to Cp'2CeF and a fluorobenzyne; the latter is trapped by either solvent when C6D6 is used or by a Cp'H ring when C6D12 is the solvent. The trapped products are identified by GCMS analysis after hydrolysis. The aryl derivatives are generated cleanly by reaction of the metallacycle, Cp'((Me3C)2C5H2C(Me2)CH2)Ce, with a hydrofluorobenzene and the resulting arylcerium products, in each case, are identified by their 1H and 19F NMR spectra at 20oC. The stereochemical principle that evolves from these studies is that the thermodynamic isomer is the one in which the CeC bond is flanked by two ortho-CF bonds. This orientation is suggested to arise from the negative charge that is localized on the ipso-carbon atom due to Co(delta+)-Fo(delta-) polarization. The preferred regioisomer is determined by thermodynamic rather than kinetic effects; this is illustrated by the quantitative, irreversible solid-state conversion at 25oC over two months of Cp'2Ce(2,3,4,5-C6HF4) to Cp'2Ce(2,3,4,6-C6HF4), an isomerization that involves a CeC(ipso) for C(ortho)F site exchange.

Andersen, Richard; Werkema, Evan L.; Andersen, Richard A.

2008-04-21T23:59:59.000Z

214

3C.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76 76 E. Aircraft Acquisition 1. Introduction In our November 1994 report entitled, "Audit of Department of Energy International Charter Flights," we reported that the Department had not established a systematic and cost- effective process to acquire international air services. We suggested that the Department establish written policy and procedures for acquiring international air service including clarification of the responsibilities for all interested parties. We stated that the written policy and procedures should clarify the responsibilities of the Office of Human Resources and Administration, Headquarters Procurement, and Office of Aviation Policy. In addition, in a December 20, 1994, memorandum to the Deputy Secretary we concluded that the

215

An acousto-optical correlation spectrometer for radio astronomy.  

E-Print Network (OSTI)

??The objective of this thesis research is to develop and construct a wide-band, high resolution, two-channel prototype acousto-optic correlation spectrometer (AOCS) to analyze signals received (more)

Cheung, Kwok-wai

1987-01-01T23:59:59.000Z

216

Optical memory  

DOE Patents (OSTI)

Optical memory comprising: a semiconductor wire, a first electrode, a second electrode, a light source, a means for producing a first voltage at the first electrode, a means for producing a second voltage at the second electrode, and a means for determining the presence of an electrical voltage across the first electrode and the second electrode exceeding a predefined voltage. The first voltage, preferably less than 0 volts, different from said second voltage. The semiconductor wire is optically transparent and has a bandgap less than the energy produced by the light source. The light source is optically connected to the semiconductor wire. The first electrode and the second electrode are electrically insulated from each other and said semiconductor wire.

Mao, Samuel S; Zhang, Yanfeng

2013-07-02T23:59:59.000Z

217

Optical switch  

DOE Patents (OSTI)

An optical switching device (10) is provided whereby light from a first glass fiber (16) or a second glass fiber (14) may be selectively transmitted into a third glass fiber (18). Each glass fiber is provided with a focusing and collimating lens system (26, 28, 30). In one mode of operation, light from the first glass fiber (16) is reflected by a planar mirror (36) into the third glass fiber (18). In another mode of operation, light from the second glass fiber (14) passes directly into the third glass fiber (18). The planar mirror (36) is attached to a rotatable table (32) which is rotated to provide the optical switching.

Reedy, Robert P. (Livermore, CA)

1987-01-01T23:59:59.000Z

218

Optical switch  

DOE Patents (OSTI)

An optical switching device is provided whereby light from a first glass fiber or a second glass fiber may be selectively transmitted into a third glass fiber. Each glass fiber is provided with a focusing and collimating lens system. In one mode of operation, light from the first glass fiber is reflected by a planar mirror into the third glass fiber. In another mode of operation, light from the second glass fiber passes directly into the third glass fiber. The planar mirror is attached to a rotatable table which is rotated to provide the optical switching. 3 figs.

Reedy, R.P.

1987-11-10T23:59:59.000Z

219

Study of the Stability of 3C-SiC Single Crystals Using High-Resolution Diffuse X-Ray Scattering  

SciTech Connect

The stability of (001)-oriented 3C silicon carbide crystals is studied by a method coupling high resolution x-ray diffraction and numerical simulations. The analysis of the diffuse scattering intensity distribution along selected directions in reciprocal space allows us to obtain qualitative and quantitative informations regarding the 3C-6H transition. Our latest results concerning the influence of the initial crystal quality (presence of defects) and of annealing time on the 3C-6H transition are presented in this article.

Dompoint, D.; Boulle, A. [Science des Procedes Ceramiques et de Traitements de Surface (SPCTS) CNRS UMR 6638, ENSCI, 47 avenue Albert Thomas 87065 Limoges Cedex (France); Galben-Sandulache, I. G.; Chaussende, D. [Laboratoire des Materiaux et du Genie Physique (LMGP) CNRS UMR 5628, Grenoble INP, Minatec, 3 parvis Louis Neel, BP 257, 38016 Grenoble Cedex 01 (France)

2010-11-01T23:59:59.000Z

220

Cost and Performance Baseline for Fossil Energy Plants; Volume 3c: Natural Gas Combined Cycle at Elevation  

NLE Websites -- All DOE Office Websites (Extended Search)

Baseline for Fossil Energy Plants Volume 3c: Natural Gas Combined Cycle at Elevation March 2011 DOE/NETL-2010/1396 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated solar receiver/biomass gasifier research  

SciTech Connect

Processes for producing liquid fuels from olefin-rich pyrolysis gases obtained from fast pyrolysis of biomass are being developed by J. Kuester at Arizona State University and J. Diebold at the Naval Weapons Center, China Lake, Calif. In the Diebold process the biomass, carried by steam, is blown through an entrained bed gasifier. The olefins are then separated from the rest of the reaction products and polymerized thermally to gasoline; the other gases are used as fuel for the process. The Kuester process uses a fluidized bed gasifier and a catalytic Fischer-Tropsch reactor which converts the olefins, hydrogen, and carbon monoxide into n-propanol and paraffinic hydrocarbons. The advantages over the Diebold process are shorter residence time and elimination of the gas separation requirement. One disadvantage is the low octane rating of the fuel. As part of the solar thermal program at the Solar Energy Research Institute (SERI), an entrained bed reactor/receiver for fast pyrolysis of biomass is being developed for use with either the Diebold or Kuester process. This system is discussed.

Benham, C.; Bergeron, P.; Bessler, G.; Bohn, M.

1979-11-01T23:59:59.000Z

222

AN ACTIVE GALACTIC NUCLEUS DRIVEN SHOCK IN THE INTRACLUSTER MEDIUM AROUND THE RADIO GALAXY 3C 310  

Science Conference Proceedings (OSTI)

We present results from a 57.6 ks Chandra observation of the cluster gas associated with the fat-double radio galaxy 3C 310. We find a surface brightness discontinuity in the gas outside the southern radio lobe that we attribute to a shock driven by the supersonic inflation of this lobe {approx}180 kpc from the nucleus. Modeling the surface brightness/density jump, the shock has Mach number 1.5-1.9, depending on the assumptions one makes about the density profile and the nature of the energy input. There are not sufficient counts in the image to detect conclusively the temperature jump associated with the shock. The total mechanical energy of the outburst is 5 Multiplication-Sign 10{sup 60} erg. Assuming a Mach 1.9 shock, the age of the outburst is {approx}100 million yrs, and the time-averaged power of the outburst is {approx}1.3 Multiplication-Sign 10{sup 45} erg s{sup -1}. The power input is 100 times greater than the radiative losses of the gas within the radius of the shock. Most importantly, the equivalent heat input due to the entropy increase is roughly 10% of the thermal energy of the gas to the radius of the shock. 3C 310 is another example where regular outbursts of the observed strength with a duty cycle of 0.1 could offset the radiative losses of the gas near the Bondi radius and regulate feedback. We also detect a cool filamentary X-ray arm along the eastern periphery of the southern radio lobe. This arm is probably composed of low-entropy gas dredged up in the inflation of the radio plasma, similar to features seen in M87.

Kraft, R. P.; Nulsen, P. E. J.; Forman, W. R.; Jones, C.; Murray, S. S. [Harvard/Smithsonian Center for Astrophysics, 60 Garden St., MS-4, Cambridge, MA 02138 (United States); Birkinshaw, M.; Worrall, D. M. [H. H. Wills Physics Laboratory, University of Bristol, Tyndall Avenue, Bristol BS8 1TL (United Kingdom); Croston, J. H. [School of Physics and Astronomy, University of Southampton, Southampton SO17 1SJ (United Kingdom); Hardcastle, M. J. [School of Physics, Astronomy, and Mathematics, University of Hertfordshire, Hatfield AL10 9AB (United Kingdom)

2012-04-10T23:59:59.000Z

223

High-performance parallel interface to synchronous optical network gateway  

DOE Patents (OSTI)

A system of sending and receiving gateways interconnects high speed data interfaces, e.g., HIPPI interfaces, through fiber optic links, e.g., a SONET network. An electronic stripe distributor distributes bytes of data from a first interface at the sending gateway onto parallel fiber optics of the fiber optic link to form transmitted data. An electronic stripe collector receives the transmitted data on the parallel fiber optics and reforms the data into a format effective for input to a second interface at the receiving gateway. Preferably, an error correcting syndrome is constructed at the sending gateway and sent with a data frame so that transmission errors can be detected and corrected in a real-time basis. Since the high speed data interface operates faster than any of the fiber optic links the transmission rate must be adapted to match the available number of fiber optic links so the sending and receiving gateways monitor the availability of fiber links and adjust the data throughput accordingly. In another aspect, the receiving gateway must have sufficient available buffer capacity to accept an incoming data frame. A credit-based flow control system provides for continuously updating the sending gateway on the available buffer capacity at the receiving gateway.

St. John, Wallace B. (Los Alamos, NM); DuBois, David H. (Los Alamos, NM)

1996-01-01T23:59:59.000Z

224

High-performance parallel interface to synchronous optical network gateway  

DOE Patents (OSTI)

Disclosed is a system of sending and receiving gateways interconnects high speed data interfaces, e.g., HIPPI interfaces, through fiber optic links, e.g., a SONET network. An electronic stripe distributor distributes bytes of data from a first interface at the sending gateway onto parallel fiber optics of the fiber optic link to form transmitted data. An electronic stripe collector receives the transmitted data on the parallel fiber optics and reforms the data into a format effective for input to a second interface at the receiving gateway. Preferably, an error correcting syndrome is constructed at the sending gateway and sent with a data frame so that transmission errors can be detected and corrected in a real-time basis. Since the high speed data interface operates faster than any of the fiber optic links the transmission rate must be adapted to match the available number of fiber optic links so the sending and receiving gateways monitor the availability of fiber links and adjust the data throughput accordingly. In another aspect, the receiving gateway must have sufficient available buffer capacity to accept an incoming data frame. A credit-based flow control system provides for continuously updating the sending gateway on the available buffer capacity at the receiving gateway. 7 figs.

St. John, W.B.; DuBois, D.H.

1996-12-03T23:59:59.000Z

225

Method to determine and adjust the alignment of the transmitter and receiver fields of view of a LIDAR system  

SciTech Connect

A method to determine the alignment of the transmitter and receiver fields of view of a light detection and ranging (LIDAR) system. This method can be employed to determine the far-field intensity distribution of the transmitter beam, as well as the variations in transmitted laser beam pointing as a function of time, temperature, or other environmental variables that may affect the co-alignment of the LIDAR system components. In order to achieve proper alignment of the transmitter and receiver optical systems when a LIDAR system is being used in the field, this method employs a laser-beam-position-sensing detector as an integral part of the receiver optics of the LIDAR system.

Schmitt, Randal L. (Tijeras, NM); Henson, Tammy D. (Albuquerque, NM); Krumel, Leslie J. (Cedar Crest, NM); Hargis, Jr., Philip J. (Albuquerque, NM)

2006-06-20T23:59:59.000Z

226

Shannon capacities and error-correction codes for optical atmospheric turbulent channels  

E-Print Network (OSTI)

beam is projected toward the receiver. At the receiver, an optical system collects the light) performance of the system. Very large coding gains--ranging from 5.5 to 14 dB, depending on the turbulence detection, the same technique that is used for state of the art fiber-optics communications

Djordjevic, Ivan B.

227

Inexpensive 20 to 160 MBd Fiber-Optic Solutions for Industrial, Medical,  

E-Print Network (OSTI)

byte-to-light com- munication systems. Only One Transceiver Design Needed This application note system's +5V power supply. The host system's +5 volt supply normally powers the fiber-optic receiver to protect the fiber-optic receiver from very noisy host systems. Printed Circuit Artwork The performance

Berns, Hans-Gerd

228

Microbend fiber-optic chemical sensor  

DOE Patents (OSTI)

A microbend fiber-optic chemical sensor for detecting chemicals in a sample, and a method for its use, is disclosed. The sensor comprises at least one optical fiber having a microbend section (a section of small undulations in its axis), for transmitting and receiving light. In transmission, light guided through the microbend section scatters out of the fiber core and interacts, either directly or indirectly, with the chemical in the sample, inducing fluorescence radiation. Fluorescence radiation is scattered back into the microbend section and returned to an optical detector for determining characteristics of the fluorescence radiation quantifying the presence of a specific chemical.

Weiss, Jonathan D. (Albuquerque, NM)

2002-01-01T23:59:59.000Z

229

THE STRUCTURE AND EMISSION MODEL OF THE RELATIVISTIC JET IN THE QUASAR 3C 279 INFERRED FROM RADIO TO HIGH-ENERGY {gamma}-RAY OBSERVATIONS IN 2008-2010  

SciTech Connect

We present time-resolved broadband observations of the quasar 3C 279 obtained from multi-wavelength campaigns conducted during the first two years of the Fermi Gamma-ray Space Telescope mission. While investigating the previously reported {gamma}-ray/optical flare accompanied by a change in optical polarization, we found that the optical emission appears to be delayed with respect to the {gamma}-ray emission by about 10 days. X-ray observations reveal a pair of 'isolated' flares separated by {approx}90 days, with only weak {gamma}-ray/optical counterparts. The spectral structure measured by Spitzer reveals a synchrotron component peaking in the mid-infrared band with a sharp break at the far-infrared band during the {gamma}-ray flare, while the peak appears in the millimeter (mm)/submillimeter (sub-mm) band in the low state. Selected spectral energy distributions are fitted with leptonic models including Comptonization of external radiation produced in a dusty torus or the broad-line region. Adopting the interpretation of the polarization swing involving propagation of the emitting region along a curved trajectory, we can explain the evolution of the broadband spectra during the {gamma}-ray flaring event by a shift of its location from {approx}1 pc to {approx}4 pc from the central black hole. On the other hand, if the {gamma}-ray flare is generated instead at sub-pc distance from the central black hole, the far-infrared break can be explained by synchrotron self-absorption. We also model the low spectral state, dominated by the mm/sub-mm peaking synchrotron component, and suggest that the corresponding inverse-Compton component explains the steady X-ray emission.

Hayashida, M.; Madejski, G. M.; Chiang, J.; Blandford, R. D.; Buehler, R. [Kavli Institute for Particle Astrophysics and Cosmology, SLAC National Accelerator Laboratory, Stanford University, 2575 Sand Hill Road M/S 29, Menlo Park, CA 94025 (United States); Nalewajko, K. [University of Colorado, UCB 440, Boulder, CO 80309 (United States); Sikora, M. [Nicolaus Copernicus Astronomical Center, 00-716 Warsaw (Poland); Wehrle, A. E. [Space Science Institute, Boulder, CO 80301 (United States); Ogle, P. [Infrared Processing and Analysis Center, California Institute of Technology Pasadena, CA 91125 (United States); Collmar, W. [Max-Planck Institut fuer Extraterrestrische Physik, 85748 Garching (Germany); Larsson, S. [Department of Physics, Stockholm University, AlbaNova, SE-106 91 Stockholm (Sweden); Fukazawa, Y.; Itoh, R. [Department of Physical Sciences, Hiroshima University, Higashi-Hiroshima, Hiroshima 739-8526 (Japan); Stawarz, L. [Institute of Space and Astronautical Science, JAXA, 3-1-1 Yoshinodai, Chuo-ku, Sagamihara, Kanagawa 252-5210 (Japan); Richards, J. L.; Max-Moerbeck, W.; Readhead, A. [Cahill Center for Astronomy and Astrophysics, California Institute of Technology, Pasadena, CA 91125 (United States); Cavazzuti, E.; Ciprini, S. [Agenzia Spaziale Italiana (ASI) Science Data Center, I-00044 Frascati (Roma) (Italy); Gehrels, N., E-mail: mahaya@slac.stanford.edu, E-mail: madejski@slac.stanford.edu, E-mail: knalew@Colorado.edu, E-mail: sikora@camk.edu.pl [NASA Goddard Space Flight Center, Greenbelt, MD 20771 (United States); and others

2012-08-01T23:59:59.000Z

230

Optical system for high resolution spectrometer/monochromator  

DOE Patents (OSTI)

An optical system for use in a spectrometer or monochromator employing a mirror which reflects electromagnetic radiation from a source to converge with same in a plane. A straight grooved, varied-spaced diffraction grating receives the converging electromagnetic radiation from the mirror and produces a spectral image for capture by a detector, target or like receiver.

Hettrick, Michael C. (Berkeley, CA); Underwood, James H. (Walnut Creek, CA)

1988-01-01T23:59:59.000Z

231

Sixty-Eight Students to Receive Nuclear Energy Scholarships and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sixty-Eight Students to Receive Nuclear Energy Scholarships and Fellowships Sixty-Eight Students to Receive Nuclear Energy Scholarships and Fellowships July 17, 2013 - 10:30am...

232

SunShot Initiative: Advanced Nitrate Salt Central Receiver Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Nitrate Salt Central Receiver Power Plant to someone by E-mail Share SunShot Initiative: Advanced Nitrate Salt Central Receiver Power Plant on Facebook Tweet about SunShot...

233

Y-12 inventors receive awards | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

inventors receive ... Y-12 inventors receive awards Posted: February 20, 2013 - 10:31am OAK RIDGE, Tenn. - At the ninth annual Y-12 Technology Transfer awards ceremony held to...

234

NREL: Wind Research - Baring-Gould Receives Champion Award from...  

NLE Websites -- All DOE Office Websites (Extended Search)

Baring-Gould Receives Champion Award from Women of Wind Energy May 20, 2013 Wind Powering America National Technical Director Ian Baring-Gould received the Champion Award at the...

235

Operational Monitoring of Weather Radar Receiving Chain Using the Sun  

Science Conference Proceedings (OSTI)

A method for operational monitoring of a weather radar receiving chain, including the antenna gain and the receiver, is presented. The online method is entirely based on the analysis of sun signals in the polar volume data produced during ...

Iwan Holleman; Asko Huuskonen; Mikko Kurri; Hans Beekhuis

2010-01-01T23:59:59.000Z

236

Designing CPV Receivers With Reliability: Early Evaluation of Components  

E-Print Network (OSTI)

Designing CPV Receivers With Reliability: Early Evaluation of Components Objective Materials from power electronics industry must be proven when integrated in PV applications. Pre-qualification tests improves the receiver design and reliability. ANU microconcentrator test&design experience

237

LLNL receives accolades from EPA's Federal Green Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

713green 05172013 LLNL receives accolades from EPA's Federal Green Challenge Jennie L Doman, LLNL, (925) 423-2216, doman3@llnl.gov Printer-friendly LLNL has received accolades...

238

Pantex receives two safety awards | National Nuclear Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex receives two safety awards Pantex receives two safety awards Posted By Office of...

239

Quantum wells on 3C-SiC/NH-SiC heterojunctions. Calculation of spontaneous polarization and electric field strength in experiments  

SciTech Connect

The results of experiments with quantum wells on 3C-SiC/4H-SiC and 3C-SiC/6H-SiC heterojunctions obtained by various methods are reconsidered. Spontaneous polarizations, field strengths, and energies of local levels in quantum wells on 3C-SiC/NH-SiC heterojunctions were calculated within a unified model. The values obtained are in agreement with the results of all considered experiments. Heterojunction types are determined. Approximations for valence band offsets on heterojunctions between silicon carbide polytypes and the expression for calculating local levels in quantum wells on the 3C-SiC/NH-SiC heterojunction are presented. The spontaneous polarizations and field strengths induced by spontaneous polarization on 3C-SiC/4H-SiC and 3C-SiC/6H-SiC heterojunctions were calculated as 0.71 and 0.47 C/m{sup 2} and 0.825 and 0.55 MV/cm, respectively.

Sbruev, I. S.; Sbruev, S. B., E-mail: science@yandex.ru [Moscow Aviation Institute (Russian Federation)

2010-10-15T23:59:59.000Z

240

Compact self-contained electrical-to-optical converter/transmitter  

DOE Patents (OSTI)

A first optical receiver and a second optical receiver are provided for receiving a calibrate command and a power switching signal, respectively, from a remote processor. A third receiver is provided for receiving an analog electrical signal from a transducer. A calibrator generates a reference signal in response to the calibrate command. A combiner mixes the electrical signal with the reference signal to form a calibrated signal. A converter converts the calibrated signal to an optical signal. A transmitter transmits the optical signal to the remote processor. A primary battery supplies power to the calibrator, the combiner, the converter, and the transmitter. An optically-activated switch supplies power to the calibrator, the combiner, the converter, and the transmitter in response to the power switching signal. An auxiliary battery supplies power continuously to the switch.

Seligmann, Daniel A. (Manteca, CA); Moss, William C. (San Mateo, CA); Valk, Theodore C. (Livermore, CA); Conder, Alan D. (Tracy, CA)

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Dixson and Fu Receive NIST Applied Research Award  

Science Conference Proceedings (OSTI)

Dixson and Fu Receive NIST Applied Research Award. For Immediate Release: December 1, 1999. *. Bookmark and Share. ...

2013-07-19T23:59:59.000Z

242

John Cahn to Receive 2011 Kyoto Prize For Fundamental ...  

Science Conference Proceedings (OSTI)

John Cahn to Receive 2011 Kyoto Prize For Fundamental Contributions to Materials Science. For Immediate Release: June 24, 2011. ...

2011-06-27T23:59:59.000Z

243

John Cahn to Receive 2011 Kyoto Prize for Fundamental ...  

Science Conference Proceedings (OSTI)

John Cahn to Receive 2011 Kyoto Prize for Fundamental Contributions to Materials Science. From NIST Tech Beat: July 6, 2011. ...

2011-07-06T23:59:59.000Z

244

Los Alamos National Laboratory receives Department of Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE environmental sustainability award Los Alamos National Laboratory receives Department of Energy environmental sustainability award EStar awards recognize excellence in...

245

EE160: Fiber-Optic Communication Systems University of California, Riverside Bourns College of Engineering, University of California, Riverside  

E-Print Network (OSTI)

EE160: Fiber-Optic Communication Systems University of California, Riverside Bourns College of Engineering, University of California, Riverside EE160: Fiber-Optic Communication Systems Spring 2005 Class, Optically Pre-Amplified Receiver · Fiber-Optic System Design Issues Homework There will be four bi

246

Optical transcutaneous bilirubin detector  

DOE Patents (OSTI)

This invention consists of a transcutaneous bilirubin detector comprising a source of light having spectral components absorbable and not absorbable by bilirubin, a handle assembly, electronic circuitry and a fiber optic bundle connecting the assembly to the light source and circuitry. Inside the assembly is a prism that receives the light from one end of the fiber optic bundle and directs it onto the skin and directs the reflected light back into the bundle. The other end of the bundle is trifucated, with one end going to the light source and the other two ends going to circuitry that determines how much light of each kind has been reflected. A relatively greater amount absorbed by the skin from the portion of the spectrum absorbable by bilirubin may indicate the presence of the illness. Preferably, two measurements are made, one on the kneecap and one on the forehead, and compared to determine the presence of bilirubin. To reduce the impact of light absorption by hemoglobin in the blood carried by the skin, pressure is applied with a plunger and spring in the handle assembly, the pressure limited by points of a button slidably carried in the assembly that are perceived by touch when the pressure applied is sufficient.

Kronberg, J.W.

1991-03-04T23:59:59.000Z

247

Occultation of the radio source 2019+098 (3C411) by comet 1983e (Sugano-Saigusa-Fujikawa)  

E-Print Network (OSTI)

[This cometary occultation observation from June 1983 remained to be formally reported due to other preoccupations of the authors. It was presented in seminars to colleagues at Ooty, Bangalore and elsewhere. We now write it up as we have been asked about it by various colleagues at various times, and feel we owe it to them to put it firmly on record.] We planned and observed with Ooty Radio Telescope the occultation with Comet 1983e Sugano-Saigusa-Fujikawa of the extragalactic radio source 2019+098 = 3C411. The results are presented formally for the first time, along with a brief account of other cometary occultations and general background of planning, execution and interpretation of such observations which will be useful for other future observers. The occultation occurred at 07:52 IST on 12th June 1983. It amounted to 25% peak to peak fluctuation in the flux density of the radio source. The rough predicted occultation time was 07:24 IST. We interpret the results after refining the occultation time to allow...

Ananthakrishnan, S

2009-01-01T23:59:59.000Z

248

Micropower RF transponder with superregenerative receiver and RF receiver with sampling mixer  

DOE Patents (OSTI)

A micropower RF transponder employs a novel adaptation of the superregenerative receiver wherein the quench oscillator is external to the regenerative transistor. The quench oscillator applies an exponentially decaying waveform rather than the usual sinewave to achieve high sensitivity at microampere current levels. Further improvements include circuit simplifications for antenna coupling, extraction of the detected signal, and a low-voltage bias configuration that allows operation with less than a 1-volt rail voltage. The inventive transponder is expected to operate as long as the battery shelf life. 13 figs.

McEwan, T.E.

1997-05-13T23:59:59.000Z

249

Micropower RF transponder with superregenerative receiver and RF receiver with sampling mixer  

DOE Patents (OSTI)

A micropower RF transdponder employs a novel adaptation of the superregenerative receiver wherein the quench oscillator is external to the regenerative transistor. The quench oscillator applies an exponentially decaying waveform rather than the usual sinewave to achieve high sensitivity at microampere current levels. Further improvements include circuit simplifications for antenna coupling, extraction of the detected signal, and a low-voltage bias configuration that allows operation with less than a 1-volt rail voltage. The inventive transponder is expected to operate as long as the battery shelf life.

McEwan, Thomas E. (Livermore, CA)

1997-01-01T23:59:59.000Z

250

OVERVIEW OF THE ATACAMA COSMOLOGY TELESCOPE: RECEIVER, INSTRUMENTATION, AND TELESCOPE SYSTEMS  

SciTech Connect

The Atacama Cosmology Telescope was designed to measure small-scale anisotropies in the cosmic microwave background and detect galaxy clusters through the Sunyaev-Zel'dovich effect. The instrument is located on Cerro Toco in the Atacama Desert, at an altitude of 5190 m. A 6 m off-axis Gregorian telescope feeds a new type of cryogenic receiver, the Millimeter Bolometer Array Camera. The receiver features three 1000-element arrays of transition-edge sensor bolometers for observations at 148 GHz, 218 GHz, and 277 GHz. Each detector array is fed by free space millimeter-wave optics. Each frequency band has a field of view of approximately 22' x 26'. The telescope was commissioned in 2007 and has completed its third year of operations. We discuss the major components of the telescope, camera, and related systems, and summarize the instrument performance.

Swetz, D. S.; Devlin, M. J.; Dicker, S. R. [Department of Physics and Astronomy, University of Pennsylvania, 209 South 33rd Street, Philadelphia, PA 19104 (United States); Ade, P. A. R. [School of Physics and Astronomy, Cardiff University, The Parade, Cardiff, Wales CF24 3AA (United Kingdom); Amiri, M.; Battistelli, E. S.; Burger, B.; Halpern, M.; Hasselfield, M. [Department of Physics and Astronomy, University of British Columbia, Vancouver, BC V6T 1Z4 (Canada); Appel, J. W.; Essinger-Hileman, T.; Fisher, R. P.; Fowler, J. W.; Hincks, A. D.; Jarosik, N. [Joseph Henry Laboratories of Physics, Jadwin Hall, Princeton University, Princeton, NJ 08544 (United States); Chervenak, J. [Code 553/665, NASA/Goddard Space Flight Center, Greenbelt, MD 20771 (United States); Doriese, W. B.; Hilton, G. C.; Irwin, K. D. [NIST Quantum Devices Group, 325 Broadway Mailcode 817.03, Boulder, CO 80305 (United States); Duenner, R. [Departamento de Astronomia y Astrofisica, Facultad de Fisica, PontificIa Universidad Catolica, Casilla 306, Santiago 22 (Chile)

2011-06-01T23:59:59.000Z

251

Seismic-frequency attenuation and moduli estimates using a fiber-optic strainmeter Ludmila Adam 1  

E-Print Network (OSTI)

-frequency attenuation and moduli estimates using a fiber-optic strainmeter = /(2n), where is the wavelength of light of strain gages, fiber-optic and ultrasonic data. * Not enough light was received at the detector (mirrorsSeismic-frequency attenuation and moduli estimates using a fiber-optic strainmeter Ludmila Adam 1

252

Solar Central Receiver Hybrid Power Systems sodium-cooled receiver concept. Final report. Volume III. Appendices  

DOE Green Energy (OSTI)

The overall, long term objective of the Solar Central Receiver Hybrid Power System is to identify, characterize, and ultimately demonstrate the viability and cost effectiveness of solar/fossil, steam Rankine cycle, hybrid power systems that: (1) consist of a combined solar central receiver energy source and a nonsolar energy source at a single, common site, (2) may operate in the base, intermediate, and peaking capacity modes, (3) produce the rated output independent of variations in solar insolation, (4) provide a significant savings (50% or more) in fuel consumpton, and (5) produce power at the minimum possible cost in mills/kWh. It is essential that these hybrid concepts be technically feasible and economically competitive with other systems in the near to mid-term time period (1985-1990) on a commercial scale. The program objective for Phase I is to identify and conceptually characterize solar/fossil steam Rankine cycle, commercial-scale, power plant systems that are economically viable and technically feasible. This volume contains appendices to the conceptual design and systems analysis studies gien in Volume II, Books 1 and 2. (WHK)

None

1980-01-01T23:59:59.000Z

253

THE PROPERTIES OF TWO LOW-REDSHIFT O VI ABSORBERS AND THEIR ASSOCIATED GALAXIES TOWARD 3C 263 ,  

SciTech Connect

Ultraviolet observations of the QSO 3C 263 (z{sub em} = 0.652) with Cosmic Origins Spectrograph and FUSE reveal O VI absorption systems at z = 0.06342 and 0.14072. WIYN multi-object spectrograph observations provide information about the galaxies associated with the absorbers. The multi-phase system at z = 0.06342 traces cool photoionized gas and warm collisionally ionized gas associated with an L {approx} 0.31 L* compact spiral emission line galaxy with an impact parameter of 63 kpc. The cool photoionized gas in the absorber is well modeled, with log U {approx} -2.6, log N(H) {approx} 17.8, log n(H) {approx} -3.3 and [Si/H] = -0.14 {+-} 0.23. The collisionally ionized gas containing C IV and O VI probably arises in cooling shock-heated transition temperature gas with log T {approx} 5.5. The absorber is likely tracing circumgalactic gas enriched by gas ejected from the spiral emission line galaxy. The simple system at z = 0.14072 only contains O VI and broad and narrow H I. The O VI with b = 33.4 {+-} 11.9 km s{sup -1} is likely associated with the broad H I {lambda}1215 absorption, with b = 86.7 {+-} 15.4 km s{sup -1}. The difference in Doppler parameters implies the detection of a very large column of warm gas with log T = 5.61(+0.16, -0.25), log N(H) = 19.54(+0.26, -0.44), and [O/H] = -1.48 (+0.46, -0.26). This absorber is possibly associated with a 1.6 L* absorption line galaxy with an impact parameter of 617 kpc, although an origin in warm filament gas or in the halo of a fainter galaxy is more likely.

Savage, B. D.; Kim, T.-S.; Wakker, B. P. [Department of Astronomy, University of Wisconsin, Madison, WI 53706 (United States); Keeney, B.; Stocke, J.; Syphers, D. [CASA, University of Colorado, Boulder, CO (United States); Narayanan, A. [Indian Institute of Space Science and Technology, Thiruvananthapuram 695547, Kerala (India)

2012-07-01T23:59:59.000Z

254

Data:Dc4f43be-be61-4b71-9d3c-a255e2e1abee | Open Energy Information  

Open Energy Info (EERE)

f43be-be61-4b71-9d3c-a255e2e1abee f43be-be61-4b71-9d3c-a255e2e1abee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of College Station, Texas (Utility Company) Effective date: 2012/02/23 End date if known: Rate name: Schedule SRE - (Small Renewable Energy Customers Conencting Single Phase Distributed Generation from Renewable Sources less than or equal to twenty (20) kW) Sector: Description: Applicable to any retail customer receiving single phase electric service under a City of College Station electric rate schedule who owns and operates an on-site generating system powered by a renewable energy technology capable of producing not more than twenty (20) kW of power and who interconnects with the City of College Station's electric distribution system. Renewable energy technology is any technology that exclusively relies on an energy source that is naturally regenerated over a short time and derived directly from the sun, indirectly from the sun, or from moving water or other natural movements and mechanisms of the environment. Renewable energy technologies include those that rely on energy derived directly from the sun, wind, geothermal source, hydroelectric source, wave or tidal energy; or on biomass or biomass based waste products including landfill gas. A renewable energy technology does not rely on energy resources derived from fossil fuels, waste products from fossil fuels, or waste products from inorganic sources. This section applies to a retail customer owned generation system that primarily offsets part or all of the customer's electric service provided by the City of College Station.

255

Hanford Contractor Receives Awards for Safety | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Receives Awards for Safety Contractor Receives Awards for Safety Hanford Contractor Receives Awards for Safety September 30, 2013 - 12:00pm Addthis RICHLAND, Wash. - A Hanford site contractor supporting EM's cleanup program has again received a prestigious safety award from DOE's Voluntary Protection Program (VPP). Advanced Technologies and Laboratories International (ATL) was presented the Star of Excellence Award for safety at the 29th annual VPP Participants Association Conference in Nashville, Tenn. Since it became a prime contractor at Hanford in 2005, ATL has received the award twice for committing to the principles of VPP, reaching established safety and health goals and attaining an injury and illness rate well below the average for similar businesses. ATL also received the 2013 Outreach Award alongside other Hanford prime

256

Hanford Contractor Receives Awards for Safety | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Contractor Receives Awards for Safety Hanford Contractor Receives Awards for Safety Hanford Contractor Receives Awards for Safety September 30, 2013 - 12:00pm Addthis RICHLAND, Wash. - A Hanford site contractor supporting EM's cleanup program has again received a prestigious safety award from DOE's Voluntary Protection Program (VPP). Advanced Technologies and Laboratories International (ATL) was presented the Star of Excellence Award for safety at the 29th annual VPP Participants Association Conference in Nashville, Tenn. Since it became a prime contractor at Hanford in 2005, ATL has received the award twice for committing to the principles of VPP, reaching established safety and health goals and attaining an injury and illness rate well below the average for similar businesses. ATL also received the 2013 Outreach Award alongside other Hanford prime

257

EM's Huizenga Receives Presidential Rank Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Huizenga Receives Presidential Rank Award EM's Huizenga Receives Presidential Rank Award EM's Huizenga Receives Presidential Rank Award May 9, 2013 - 12:00pm Addthis EM Senior Advisor Dave Huizenga, left, receives the Presidential Rank of Distinguished Executive award from Eric Coulter, treasurer of the board of directors for the Senior Executives Association, which sponsors the awards program. EM Senior Advisor Dave Huizenga, left, receives the Presidential Rank of Distinguished Executive award from Eric Coulter, treasurer of the board of directors for the Senior Executives Association, which sponsors the awards program. WASHINGTON, D.C. - EM Senior Advisor Dave Huizenga recently received the nation's highest civil service recognition, the Presidential Rank of Distinguished Executive award. The Senior Executives Association sponsored the annual awards event. In

258

Radiant energy receiver having improved coolant flow control means  

DOE Patents (OSTI)

An improved coolant flow control for use in radiant energy receivers of the type having parallel flow paths is disclosed. A coolant performs as a temperature dependent valve means, increasing flow in the warmer flow paths of the receiver, and impeding flow in the cooler paths of the receiver. The coolant has a negative temperature coefficient of viscosity which is high enough such that only an insignificant flow through the receiver is experienced at the minimum operating temperature of the receiver, and such that a maximum flow is experienced at the maximum operating temperature of the receiver. The valving is accomplished by changes in viscosity of the coolant in response to the coolant being heated and cooled. No remotely operated valves, comparators or the like are needed.

Hinterberger, H.

1980-10-29T23:59:59.000Z

259

WIPP Receives Top Safety Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP Receives Top Safety Award WIPP Receives Top Safety Award WIPP Receives Top Safety Award November 9, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top accolades from New Mexico's leading mining organizations. The New Mexico Bureau of Mine Safety (BMS) recently recognized URS Washington TRU Solutions (WTS), LLC, the WIPP management and operating contractor, for receiving the New Mexico Mining Association (NMMA) and New Mexico BMS Safe Operator of the Year Award. "I'm pleased to congratulate Washington TRU Solutions and the WIPP workforce for receiving the state's top mine safety award for 23 of the past 25 years," said Ed Ziemianski, Carlsbad Field Office Interim

260

EM's Huizenga Receives Presidential Rank Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Huizenga Receives Presidential Rank Award Huizenga Receives Presidential Rank Award EM's Huizenga Receives Presidential Rank Award May 9, 2013 - 12:00pm Addthis EM Senior Advisor Dave Huizenga, left, receives the Presidential Rank of Distinguished Executive award from Eric Coulter, treasurer of the board of directors for the Senior Executives Association, which sponsors the awards program. EM Senior Advisor Dave Huizenga, left, receives the Presidential Rank of Distinguished Executive award from Eric Coulter, treasurer of the board of directors for the Senior Executives Association, which sponsors the awards program. WASHINGTON, D.C. - EM Senior Advisor Dave Huizenga recently received the nation's highest civil service recognition, the Presidential Rank of Distinguished Executive award. The Senior Executives Association sponsored the annual awards event. In

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Fiber-optic voltage sensor  

DOE Patents (OSTI)

A fiber optic voltage sensor is described which includes a source of light, a reference fiber for receiving a known percentage of the light and an electrostrictive element having terminals across which is applied, a voltage to be measured. The electrostrictive element is responsive to the applied voltage to assume an altered physical state. A measuring fiber also receives a known percentage of light from the light source and is secured about the electrostrictive element. The measuring fiber is provided with a cladding and exhibits an evanescent wave in the cladding. The measuring fiber has a known length which is altered when the electrostrictive element assumes its altered physical state. A differential sensor is provided which senses the intensity of light in both the reference fiber and the measuring fiber and provides an output indicative of the difference between the intensities.

Wood, C.B.

1990-01-01T23:59:59.000Z

262

Fiber-optic voltage sensor  

DOE Patents (OSTI)

A fiber optic voltage sensor is described which includes a source of light, a reference fiber for receiving a known percentage of the light and an electrostrictive element having terminals across which is applied, a voltage to be measured. The electrostrictive element is responsive to the applied voltage to assume an altered physical state. A measuring fiber also receives a known percentage of light from the light source and is secured about the electrostrictive element. The measuring fiber is provided with a cladding and exhibits an evanescent wave in the cladding. The measuring fiber has a known length which is altered when the electrostrictive element assumes its altered physical state. A differential sensor is provided which senses the intensity of light in both the reference fiber and the measuring fiber and provides an output indicative of the difference between the intensities.

Wood, C.B.

1990-12-31T23:59:59.000Z

263

Receiver for solar-energy collector having improved aperture aspect  

DOE Patents (OSTI)

A secondary concentrator for use in receiver systems for linear focusing primary concentrators is provided with reflector wings at each end. The wings increase the capture of light rays reflected from areas adjacent the rim of a primary concentrator, increasing the apparent aperture size of the receiver as viewed from the rim of the primary concentrator. The length, tilt, and curvature of the wing reflectors can be adjusted to provide a receiver having a desired aperture aspect.

McIntire, W.R.

1981-03-13T23:59:59.000Z

264

NNSA's Global Threat Reduction Initiative Receives 2010 Distinguished  

NLE Websites -- All DOE Office Websites (Extended Search)

Receives 2010 Distinguished Receives 2010 Distinguished Project Award from PMI | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > NNSA's Global Threat Reduction Initiative Receives 2010 ... Press Release NNSA's Global Threat Reduction Initiative Receives 2010 Distinguished

265

Interference mitigation techniques for SAW-less CDMA receivers  

E-Print Network (OSTI)

fre- quency division duplexed (FDD) receivers. In the ?rstfrequency-division duplexed (FDD), i.e. , the mobile stationfrequency-division duplexed (FDD) wireless communication

Khatri, Himanshu

2009-01-01T23:59:59.000Z

266

Highly linear SAW-less receiver design techniques for CDMA  

E-Print Network (OSTI)

frequency divi- sion duplexed (FDD) receivers, so that thefor frequency division duplex (FDD) systems [9,28], and thethe leaked Tx signal in FDD system prevent SAW- less

Kim, Nam Soo

2010-01-01T23:59:59.000Z

267

Alaska Native Communities Receive Technical Assistance for Local...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will receive assistance with prioritizing renewable energy projects, evaluating feasibility studies, fostering community support, and identifying next steps to move projects...

268

LED North America Receives Exclusive Patent License for ORNL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Highlights Success Stories Contact Us Index Home | ORNL | Success Stories SHARE LED North America Receives Exclusive Patent License for ORNL Technology June 19, 2013 Views...

269

Field Survey of Parabolic Trough Receiver Thermal Performance: Preprint  

SciTech Connect

This paper describes a technique that uses an infrared camera to evaluate the in-situ thermal performance of parabolic trough receivers at operating solar power plants.

Price, H.; Forristall, R.; Wendelin, T.; Lewandowski, A.; Moss, T.; Gummo, C.

2006-04-01T23:59:59.000Z

270

Window and seal design for a small particle solar receiver.  

E-Print Network (OSTI)

??Central receivers for solar power towers have recently been under intense investigation. They can convert solar radiation into electricity by supplying heat to a thermodynamic (more)

Mande, Onkar Kiran

2012-01-01T23:59:59.000Z

271

Collector/Receiver Characterization (Fact Sheet), Thermal Systems...  

NLE Websites -- All DOE Office Websites (Extended Search)

radiation falling on the trough aperture operating near ambient temperature to the thermal energy collected by the fluid flowing through the receiver tube. A parabolic trough,...

272

Five companies received funding through new venture acceleration...  

NLE Websites -- All DOE Office Websites (Extended Search)

proposals and those receiving funding included: San Ildefonso Development Corp., Three Eagles Development Corp., Cochitit Pueblo Development Corp., Sunbeam Indian Art and Avanyu...

273

Alaska Native Communities Receive Technical Assistance for Local...  

NLE Websites -- All DOE Office Websites (Extended Search)

Articles Alaska Native Tribes Receive Technical Assistance for Local Clean Energy Projects DOE Office of Indian Energy Partners with ACEP to Study Wind-Diesel Systems in Alaska...

274

Alaska Native Tribes Receive Technical Assistance for Local Clean...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Kake will receive assistance to help develop a community energy plan; relocating a wind met-tower closer to the village; conduct biomass and hydro generation feasibility...

275

Charles "Chuck" Farrar to receive DeMichele Award  

NLE Websites -- All DOE Office Websites (Extended Search)

Institute, will receive the 2013 DeMichele Award from the Society for Experimental Mechanics. The award is presented for demonstrated "exemplary service and support of promoting...

276

NNSA National Security Campus Receives LEED Gold Certification...  

NLE Websites -- All DOE Office Websites (Extended Search)

Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > NNSA National Security Campus Receives LEED Gold...

277

Newest LANL Facility Receives LEED Gold Certification | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Newest LANL Facility Receives LEED Gold Certification | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear...

278

DOE Receives Responses on the Implementation of Large-Capacity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

units. We received responses from several parties, which can be found below. Alliance Laundry Systems EarthJustice Electrolux GE Appliances and Lighting LG Electronics Whirlpool...

279

SunShot Initiative: High-Flux Microchannel Solar Receiver  

NLE Websites -- All DOE Office Websites (Extended Search)

(CSP) R&D funding opportunity announcement (FOA), are working to develop an advanced heat exchanger for use in CSP receivers. The heat exchanger has the potential to...

280

Solar Radio Burst Effects on Global Positioning System Receivers .  

E-Print Network (OSTI)

??This thesis presents a series of studies investigating solar radio burst effects on Global Positioning System (GPS) receivers along with supporting instrumentation and analysis techniques. (more)

Cerruti, Alessandro Paolo

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE Lab Receives Award for Work on Drilling Technology | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

recognized as an innovator in this area is an honor. The Department of Energy's National Energy Technology Laboratory (NETL) recently received that honor when it was recognized...

282

Pantexan receives Crime Stoppers volunteer award | National Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantexan receives Crime Stoppers volunteer award | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

283

NETL: News Release - Drilling Operators Receive Boost from New...  

NLE Websites -- All DOE Office Websites (Extended Search)

Drilling Operators Receive Boost from New Database to Weigh Options Regarding Waste Management Interactive Website Provides Easy Access to Technological, Environmental, and...

284

NETL'S CHORPENING RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD  

NLE Websites -- All DOE Office Websites (Extended Search)

CHORPENING RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD Morgantown, W.Va. - The National Energy Technology Laboratory's (NETL) Ben Chorpening has been selected by the Pittsburgh...

285

NETL'S WOODRUFF RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD  

NLE Websites -- All DOE Office Websites (Extended Search)

WOODRUFF RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD Morgantown, W.Va. - The National Energy Technology Laboratory's (NETL) Dr. Steven D. Woodruff has been selected by the...

286

NETL'S LYONS RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD  

NLE Websites -- All DOE Office Websites (Extended Search)

LYONS RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD Morgantown, W.Va. - The National Energy Technology Laboratory's (NETL) David Lyons has been selected by the Pittsburgh...

287

NETL'S GOLLAKOTA RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD  

NLE Websites -- All DOE Office Websites (Extended Search)

GOLLAKOTA RECEIVES 2012 EXCELLENCE IN GOVERNMENT AWARD Morgantown, W.Va. - The National Energy Technology Laboratory's (NETL) Dr. Sai Gollakota has been selected by the...

288

NETL's Ohodnicki Receives 2012 Excellence in Government Award  

NLE Websites -- All DOE Office Websites (Extended Search)

Ohodnicki Receives 2012 Excellence in Government Award Pittsburgh, Pa. - The National Energy Technology Laboratory's (NETL) Paul R. Ohodnicki, Jr., has been selected by the...

289

Reproductive Goals and Behavior Among Teen Mothers Receiving AFDC  

E-Print Network (OSTI)

GOALS AND BEHAVIORS AMONG TEEN MOTHERS RECEIVING AFDC ReportSubmitted AFDC Policy to: Brandl Services Implementationnot living No boyfnend status: AFDC Program Currently on

Mauldon, Jane; Maestas, Nicole

1999-01-01T23:59:59.000Z

290

Four Argonne National Laboratory scientists receive Early Career...  

NLE Websites -- All DOE Office Websites (Extended Search)

Four Argonne National Laboratory scientists receive Early Career Research Program awards By Brian Grabowski * May 10, 2012 Tweet EmailPrint ARGONNE, Ill. - Four researchers at the...

291

Argonne fast-reactor pioneer receives international prize  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne fast-reactor pioneer receives international prize Director's Welcome Organization Achievements Highlights Fact Sheets, Brochures & Other Documents Multimedia Library About...

292

Secretary Chu Announces 150 Students to Receive Graduate Fellowships...  

NLE Websites -- All DOE Office Websites (Extended Search)

Secretary Chu Announces 150 Students to Receive Graduate Fellowships in Science, Mathematics and Engineering New Department of Energy Graduate Fellowship Program Aimed at...

293

Analysis and design of CMOS ultra wideband receivers  

E-Print Network (OSTI)

robust operation of the receiver in dense wireless networks.satisfactory operation of the UWB system in dense wirelesswireless environments. The successful and robust operation

Ranjan, Mahim

2006-01-01T23:59:59.000Z

294

Sandia National Laboratories: Sandia Receives Award for Electronics...  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratories has received an award for reducing the environmental impacts of the computers, printers and other office electronics it uses through its fiscal year 2010...

295

Sixty-five New Mexico students receive Los Alamos Employees'...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 May Los Alamos Employees' Scholarship Fund recipients Sixty-five New Mexico students receive Los Alamos Employees' Scholarship Fund scholarships Los Alamos High School...

296

Seventy-three New Mexico students receive Los Alamos Employees...  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees' Scholarship Fund Seventy-three New Mexico students receive Los Alamos Employees' Scholarship Fund scholarships Kevin Gao, Micaela Lucero and Danielle Harrier share this...

297

Fifty-five New Mexico students receive Los Alamos Employees'...  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees' Scholarship Fund scholarships Fifty-five New Mexico students receive Los Alamos Employees' Scholarship Fund scholarships Escalante High School senior Estevan Trujillo is...

298

Lempke receives Sandia Emergency Operations Center tour | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

receives Sandia Emergency Operations Center tour | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

299

Polarization-independent optical wavelength filter for channel dropping applications  

DOE Patents (OSTI)

The polarization dependence of optical wavelength filters is eliminated by using waveguide directional couplers. Material birefringence is used to compensate for the waveguide (electromagnetic) birefringence which is the original cause of the polarization dependence. Material birefringence is introduced in a controllable fashion by replacing bulk waveguide layers by finely layered composites, such as multiple quantum wells using III-V semiconductor materials. The filter has use in wavelength-division-multiplexed fiber optic communication systems. This filter has broad application for wavelength-tunable receivers in fiber optic communication links, which may be used for telecommunications, optical computer interconnect links, or fiber optic sensor systems. Since multiple-wavelength systems are increasingly being used for all of these applications, the filter is useable whenever a rapidly tunable, wavelength-filtering receiver is required.

Deri, Robert J. (Pleasanton, CA); Patterson, Frank (Livermore, CA)

1996-01-01T23:59:59.000Z

300

Polarization-independent optical wavelength filter for channel dropping applications  

DOE Patents (OSTI)

The polarization dependence of optical wavelength filters is eliminated by using waveguide directional couplers. Material birefringence is used to compensate for the waveguide (electromagnetic) birefringence which is the original cause of the polarization dependence. Material birefringence is introduced in a controllable fashion by replacing bulk waveguide layers by finely layered composites, such as multiple quantum wells using III-V semiconductor materials. The filter has use in wavelength-division multiplexed fiber optic communication systems. This filter has broad application for wavelength-tunable receivers in fiber optic communication links, which may be used for telecommunications, optical computer interconnect links, or fiber optic sensor systems. Since multiple-wavelength systems are increasingly being used for all of these applications, the filter is useable whenever a rapidly tunable, wavelength-filtering receiver is required. 14 figs.

Deri, R.J.; Patterson, F.

1996-05-07T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Discovery of Very High Energy Gamma-Rays from the Distant Flat Spectrum Radio Quasar 3C 279 with the MAGIC Telescope  

E-Print Network (OSTI)

The quasar 3C 279 is one of the best-studied flat spectrum radio quasars. It is located at a comparatively large redshift of z=0.536: E>100 GeV observations of such distant sources were until recently impossible both due to the expected steep energy spectrum and the expected attenuation of the gamma-rays by the extragalactic background light. Here we present results on the observation of 3C 279 with the MAGIC telescope in early 2006. We report the detection of a significant very high energy gamma-ray signal in the MAGIC energy range on the observation night of 2006 February 23.

Masahiro Teshima; Elisa Prandini; Rudolf Bock; Manel Errando; Daniel Kranich; Pratik Majumdar; Daniel Mazin; Elina Lindfors; Eckart Lorenz; Mose Mariotti; Villi Scalzotto; Robert Wagner

2007-09-10T23:59:59.000Z

302

Fiber optical assembly for fluorescence spectrometry  

DOE Patents (OSTI)

A system for analyzing a sample for the presence of an analyte in a sample. The system includes a sample holder for containing the sample; an excitation source, such as a laser, and at least one linear array radially disposed about the sample holder. Radiation from the excitation source is directed to the sample, and the radiation induces fluorescent light in the sample. Each linear array includes a plurality of fused silica optical fibers that receive the fluorescent light and transmits a fluorescent light signal from the first end to an optical end port of the linear array. An end port assembly having a photo-detector is optically coupled to the optical end port. The photo-detector detects the fluorescent light signal and converts the fluorescent light signal into an electrical signal.

Carpenter, II, Robert W. (Pagosa Springs, CO); Rubenstein, Richard (Staten Island, NY); Piltch, Martin (Los Alamos, NM); Gray, Perry (Los Alamos, NM)

2010-12-07T23:59:59.000Z

303

Optical data latch  

DOE Patents (OSTI)

An optical data latch is formed on a substrate from a pair of optical logic gates in a cross-coupled arrangement in which optical waveguides are used to couple an output of each gate to an photodetector input of the other gate. This provides an optical bi-stability which can be used to store a bit of optical information in the latch. Each optical logic gate, which can be an optical NOT gate (i.e. an optical inverter) or an optical NOR gate, includes a waveguide photodetector electrically connected in series with a waveguide electroabsorption modulator. The optical data latch can be formed on a III-V compound semiconductor substrate (e.g. an InP or GaAs substrate) from III-V compound semiconductor layers. A number of optical data latches can be cascaded to form a clocked optical data shift register.

Vawter, G. Allen (Corrales, NM)

2010-08-31T23:59:59.000Z

304

Publications Received Books listed below that are marked with a  

E-Print Network (OSTI)

: CSL1 Publications (Stanford monographs in linguistics), 2001, viii+255 pp; distributedPublications Received Books listed below that are marked with a t have been selected for review. All rel- evant books received will be listed, but not all can be reviewed. Technical reports (other

305

Publications Received Books listed below that are marked with a  

E-Print Network (OSTI)

, volume 1 Harry Bunt and Reinhard Muskens (editors) (Tilburg University) Dordrecht: Kluwer Academic 468 #12;Publications Received Meijs, volume 30), 2000, xv+344 pp; hardbound, ISBN 90-420-0419-3, $97Publications Received Books listed below that are marked with a t have been selected for review

306

Numerical modeling of dish-Stirling reflux solar receivers  

DOE Green Energy (OSTI)

Using reflux solar receivers to collect solar energy for dish-Stirling electric power generation systems is currently being investigated by several organizations, including Sandia National Laboratories, Albuquerque, New Mexico. In support of this program, Sandia has developed two numerical models describing the energy transfer within and thermal performance of pool-boiler and heat-pipe receivers. Both models are applicable to axisymmetric geometries and they both consider the radiative and convective energy transfer within the receiver cavity, the conductive and convective energy transfer within the receiver cavity, the conductive and convective energy transfer from the receiver housing, and the energy transfer to the receiver working fluid. In these models, the radiative transfer within the receiver is analyzed using a two-band (solar and infrared) net-radiation formulation for enclosure radiation. Empirical convective correlations describe the convective heat transfer from the cavity to the surroundings. The primary difference between the models is the level of detail in modeling the heat conduction through the receiver walls. The more detailed model uses a two-dimensional finite control volume method, whereas the simpler model uses a one-dimensional thermal resistance approach. 20 refs., 7 figs., 2 tabs.

Hogan, R.E.

1990-01-01T23:59:59.000Z

307

High-temperature seal development for the share receiver  

DOE Green Energy (OSTI)

The development and experimental demonstration of a high-temperature seal for the SHARE ceramic dome cavity receiver is reported. The mechanical contact seal which was tested on one-foot diameter silicon carbide ceramic dome hardware at pressure differentials to four atmospheres and dome temperatures to 2200/sup 0/F (1200/sup 0/C) showed negligible leakage at expected receiver operating conditions.

Jarvinen, P. O.

1979-01-01T23:59:59.000Z

308

WIPP Receives First Shipment | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP Receives First Shipment | National Nuclear Security Administration WIPP Receives First Shipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > WIPP Receives First Shipment WIPP Receives First Shipment March 26, 1999 Carlsbad, NM WIPP Receives First Shipment After more than two decades of political, legal, and bureaucratic delays,

309

Energy Department Receives EPA Award for Top Green Power Purchase |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Receives EPA Award for Top Green Power Purchase Energy Department Receives EPA Award for Top Green Power Purchase Energy Department Receives EPA Award for Top Green Power Purchase September 24, 2013 - 12:19pm Addthis The Energy Department announced today that it has received a 2013 Green Power Leadership Award from the U.S. Environmental Protection Agency (EPA). The annual awards recognize the country's leading green power consumers for their commitment and contribution to helping advance the development of the nation's voluntary green power market. EPA presented the Energy Department with the award at an event held in conjunction with the 2013 Renewable Energy Markets Conference in Austin, Texas, on September 23, 2013. The Department was one of only eight organizations nationwide to receive a Leadership Award for utilization of green power. The award recognizes EPA

310

Energy Department Receives EPA Award for Top Green Power Purchase |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Receives EPA Award for Top Green Power Purchase Energy Department Receives EPA Award for Top Green Power Purchase Energy Department Receives EPA Award for Top Green Power Purchase September 24, 2013 - 12:19pm Addthis The Energy Department announced today that it has received a 2013 Green Power Leadership Award from the U.S. Environmental Protection Agency (EPA). The annual awards recognize the country's leading green power consumers for their commitment and contribution to helping advance the development of the nation's voluntary green power market. EPA presented the Energy Department with the award at an event held in conjunction with the 2013 Renewable Energy Markets Conference in Austin, Texas, on September 23, 2013. The Department was one of only eight organizations nationwide to receive a Leadership Award for utilization of green power. The award recognizes EPA

311

Optical absorption measurement system  

DOE Patents (OSTI)

The system of the present invention contemplates a non-intrusive method for measuring the temperature rise of optical elements under high laser power optical loading to determine the absorption coefficient. The method comprises irradiating the optical element with a high average power laser beam, viewing the optical element with an infrared camera to determine the temperature across the optical element and calculating the absorption of the optical element from the temperature.

Draggoo, V.G.; Morton, R.G.; Sawicki, R.H.; Bissinger, H.D.

1986-09-17T23:59:59.000Z

312

Optical absorption measurement system  

DOE Patents (OSTI)

The system of the present invention contemplates a non-intrusive method for measuring the temperature rise of optical elements under high laser power optical loading to determine the absorption coefficient. The method comprises irradiating the optical element with a high average power laser beam, viewing the optical element with an infrared camera to determine the temperature across the optical element and calculating the absorption of the optical element from the temperature.

Draggoo, Vaughn G. (Livermore, CA); Morton, Richard G. (San Diego, CA); Sawicki, Richard H. (Pleasanton, CA); Bissinger, Horst D. (Livermore, CA)

1989-01-01T23:59:59.000Z

313

Impact of Spatial Filtering on the Least Cost Path Method: Selecting a High-Speed Rail Route for Ohio's 3-C Corridor  

Science Conference Proceedings (OSTI)

In the face of renewed interest in High-Speed Rail (HSR) projects, Ohio is one of several states seeking federal funding to relieve pressure on aging, overburdened highway infrastructure by constructing passenger rail routes between major cities. This ... Keywords: 3-C Corridor, High-Speed Rail, Least Cost Path, Ohio Hub Project, Rail Routing

Amy E. Rock; Amanda Mullett; Saad Algharib; Jared Schaffer; Jay Lee

2010-10-01T23:59:59.000Z

314

Structural analysis of a reflux pool-boiler solar receiver  

DOE Green Energy (OSTI)

Coupled thermal-structural finite element calculations of a reflux pool-boiler solar receiver were performed to characterize the operating stresses and to address issues affecting the service life of the receiver. Analyses performed using shell elements provided information for receiver material selection and design optimization. Calculations based on linear elastic fracture mechanics principles were performed using continuum elements to assess the vulnerability of a seam-weld to fatigue crack growth. All calculations were performed using ABAQUS, a general purpose finite element code, and elements specifically formulated for coupled thermal-structural analysis. Two materials were evaluated: 316L SS and Haynes 230 alloys. The receiver response was simulated for a combination of structural and thermal loads that represent the startup and operating conditions of the receiver. For both materials, maximum stresses in the receiver developed shortly after startup due to uneven temperature distribution across the receiver surface. The largest effective stress was near yield in the 316L SS receiver and below 39 percent of yield in the Haynes 230 receiver. The calculations demonstrated that stress reductions of over 25 percent could be obtained by reducing the aft dome thickness to one closer to the absorber. The fatigue calculations demonstrated that the stress distribution near the seam-weld notch depends primarily on the structural load created by internal pressurization of the receiver rather than the thermal, indicating that the thermal loads can be neglected when assessing the stress intensity near the seam-weld notch. The stress intensity factor, computed using the J-integral method and crack opening-displacement field equations, was significantly below the fatigue threshold for most steels. The calculations indicated that the weld notch was always loaded in compression, a condition which is not conducive to fatigue crack growth. 15 refs., 30 figs., 3 tabs.

Hoffman, E.L.; Stone, C.M.

1991-06-01T23:59:59.000Z

315

Fiber optic monitoring device  

DOE Patents (OSTI)

A device for the purpose of monitoring light transmissions in optical fibers comprises a fiber optic tap that optically diverts a fraction of a transmitted optical signal without disrupting the integrity of the signal. The diverted signal is carried, preferably by the fiber optic tap, to a lens or lens system that disperses the light over a solid angle that facilitates viewing. The dispersed light indicates whether or not the monitored optical fiber or system of optical fibers is currently transmitting optical information. 4 figures.

Samborsky, J.K.

1993-10-05T23:59:59.000Z

316

Fiber optic monitoring device  

DOE Patents (OSTI)

This invention is comprised of a device for the purpose of monitoring light transmissions in optical fibers comprises a fiber optic tap that optically diverts a fraction of a transmitted optical signal without disrupting the integrity of the signal. The diverted signal is carried, preferably by the fiber optic tap, to a lens or lens system that disperses the light over a solid angle that facilitates viewing. The dispersed light indicates whether or not the monitored optical fiber or system of optical fibers is currently transmitting optical information.

Samborsky, J.K.

1992-12-31T23:59:59.000Z

317

Optically isolated signal coupler with linear response  

DOE Patents (OSTI)

An optocoupler for isolating electrical signals that translates an electrical input signal linearly to an electrical output signal. The optocoupler comprises a light emitter, a light receiver, and a light transmitting medium. The light emitter, preferably a blue, silicon carbide LED, is of the type that provides linear, electro-optical conversion of electrical signals within a narrow wavelength range. Correspondingly, the light receiver, which converts light signals to electrical signals and is preferably a cadmium sulfide photoconductor, is linearly responsive to light signals within substantially the same wavelength range as the blue LED.

Kronberg, James W. (Aiken, SC)

1994-01-01T23:59:59.000Z

318

Electro-optic component mounting device  

DOE Patents (OSTI)

A technique is provided for integrally mounting a device such as an electro-optic device in a transmission line to avoid series resonant effects. A center conductor of the transmission line has an aperture formed therein for receiving the device. The aperture splits the center conductor into two parallel sections on opposite sides of the device. For a waveguide application, the center conductor is surrounded by a conductive ground surface which is spaced apart from the center conductor with a dielectric material. One set of electrodes formed on the surface of the electro-optic device is directly connected to the center conductor and an electrode formed on the surface of the electro-optic device is directly connected to the conductive ground surface. The electrodes formed on the surface of the electro-optic device are formed on curved sections of the surface of the device to mate with correspondingly shaped electrodes on the conductor and ground surface to provide a uniform electric field across the electro-optic device. The center conductor includes a passage formed therein for passage of optical signals to an electro-optic device. 10 figs.

Gruchalla, M.E.

1994-09-13T23:59:59.000Z

319

Optical extensometer  

DOE Patents (OSTI)

An optical extensometer is described using sequentially pulsed light beams for measuring the dimensions of objects by detecting two opposite edges of the object without contacting the object. The light beams may be of different distinguishable light characteristics, such as polarization or wave length, and are time modulated in an alternating manner at a reference frequency. The light characteristics are of substantially the same total light energy and are distributed symmetrically. In the preferred embodiment two light beam segments of one characteristic are on opposite sides of a middle segment of another characteristic. As a result, when the beam segments are scanned sequentially across two opposite edges of the object, they produce a readout signal at the output of a photoelectric detector that is compared with the reference signal by a phase comparator to produce a measurement signal with a binary level transition when the light beams cross an edge. The light beams may be of different cross sectional geometries, including two superimposed and concentric circular beam cross sections of different diameter, or two rectangular cross sections which intersect with each other substantially perpendicular so only their central portions are superimposed. Alternately, a row of three light beams can be used including two outer beams on opposite sides and separate from a middle beam. The three beams may all be of the same light characteristic. However it is preferable that the middle beam be of a different characteristic but of the same total energy as the two outer beams.

Walker, Ray A. (Kennewick, WA); Reich, Fred R. (Richland, WA); Russell, James T. (Richland, WA)

1978-01-01T23:59:59.000Z

320

Optical NAND gate  

DOE Patents (OSTI)

An optical NAND gate is formed from two pair of optical waveguide devices on a substrate, with each pair of the optical waveguide devices consisting of an electroabsorption modulator and a photodetector. One pair of the optical waveguide devices is electrically connected in parallel to operate as an optical AND gate; and the other pair of the optical waveguide devices is connected in series to operate as an optical NOT gate (i.e. an optical inverter). The optical NAND gate utilizes two digital optical inputs and a continuous light input to provide a NAND function output. The optical NAND gate can be formed from III-V compound semiconductor layers which are epitaxially deposited on a III-V compound semiconductor substrate, and operates at a wavelength in the range of 0.8-2.0 .mu.m.

Skogen, Erik J. (Albuquerque, NM); Raring, James (Goleta, CA); Tauke-Pedretti, Anna (Albuquerque, NM)

2011-08-09T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NNSA's Second Line of Defense Program Receives Capability Award |  

NLE Websites -- All DOE Office Websites (Extended Search)

Second Line of Defense Program Receives Capability Award | Second Line of Defense Program Receives Capability Award | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA's Second Line of Defense Program Receives ... NNSA's Second Line of Defense Program Receives Capability Award Posted By Office of Public Affairs NNSA's Second Line of Defense (SLD) was awarded the 2013 Non-Conventional

322

Lab receives an additional $19 million for environmental cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab receives an additional $19 million for environmental cleanup Lab receives an additional $19 million for environmental cleanup Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Lab receives an additional $19 million for environmental cleanup Lab also selects local businesses for five-year contracts June 1, 2013 Governor Susana Martinez visited the Lab in May to urge additional funding for cleanup Governor Susana Martinez visited the Lab in May to urge additional funding for cleanup Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Thanks to support from New Mexico Senators Tom Udall and Martin Heinrich, Representatives Ben Ray Lujan and Steve Pearce and Governor Susana Martinez, the Lab has received an additional $19 million for environmental

323

WIPP Receives Top Safety Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Top Safety Award Top Safety Award WIPP Receives Top Safety Award November 9, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top accolades from New Mexico's leading mining organizations. The New Mexico Bureau of Mine Safety (BMS) recently recognized URS Washington TRU Solutions (WTS), LLC, the WIPP management and operating contractor, for receiving the New Mexico Mining Association (NMMA) and New Mexico BMS Safe Operator of the Year Award. "I'm pleased to congratulate Washington TRU Solutions and the WIPP workforce for receiving the state's top mine safety award for 23 of the past 25 years," said Ed Ziemianski, Carlsbad Field Office Interim

324

Energy Department Receives Prestigious Closing the Circle Awards for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Receives Prestigious Closing the Circle Awards Receives Prestigious Closing the Circle Awards for Environmental Stewardship Energy Department Receives Prestigious Closing the Circle Awards for Environmental Stewardship June 13, 2007 - 1:40pm Addthis DOE Won Four Out of Ten Civilian Awards WASHINGTON, DC - The Department of Energy (DOE) this week received four White House Closing the Circle (CTC) awards, which recognize federal leadership in green purchasing, electronics recycling, and energy efficiency practices. These awards are presented annually by the Office of the Federal Environmental Executive for outstanding achievements of Federal employees and their facilities for efforts that make a significant positive impact on environmental stewardship. "I am proud to accept these awards on behalf of all the employees of the

325

Secretary Chu Announces 68 Scientists to Receive Early Career Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

68 Scientists to Receive Early Career 68 Scientists to Receive Early Career Research Program Funding Secretary Chu Announces 68 Scientists to Receive Early Career Research Program Funding May 18, 2012 - 3:05pm Addthis News Media Contact (202) 386-4940 WASHINGTON - Underscoring the Obama Administration's commitment to investing in innovation and the American workforce, U.S. Department of Energy Secretary Steven Chu today announced that 68 scientists from across the nation will receive up to $18.9 million in funding for research grants as part of DOE's Early Career Research Program. The effort, now in its third year, is designed to bolster the nation's scientific workforce by providing support to exceptional researchers during the crucial early career years, when many scientists do their most formative work.

326

NNSA labs, sites receive DOE Sustainability Awards | National Nuclear  

National Nuclear Security Administration (NNSA)

labs, sites receive DOE Sustainability Awards | National Nuclear labs, sites receive DOE Sustainability Awards | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA labs, sites receive DOE Sustainability Awards NNSA labs, sites receive DOE Sustainability Awards Posted By Office of Public Affairs In keeping with NNSA's commitment to improving the way it does business,

327

Newest LANL Facility Receives LEED Gold Certification | National Nuclear  

National Nuclear Security Administration (NNSA)

Newest LANL Facility Receives LEED Gold Certification | National Nuclear Newest LANL Facility Receives LEED Gold Certification | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Newest LANL Facility Receives LEED Gold Certification Newest LANL Facility Receives LEED Gold Certification Posted By Office of Public Affairs RULOB LANL's newest facility, the Radiological Laboratory Utility Office

328

Sandia Photovoltaic Vehicle receives GreenGov Presidential Award | National  

National Nuclear Security Administration (NNSA)

Photovoltaic Vehicle receives GreenGov Presidential Award | National Photovoltaic Vehicle receives GreenGov Presidential Award | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > Sandia Photovoltaic Vehicle receives GreenGov Presidential Award ... Press Release Sandia Photovoltaic Vehicle receives GreenGov Presidential Award

329

Energy Department Receives Prestigious Closing the Circle Awards for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Receives Prestigious Closing the Circle Awards Energy Department Receives Prestigious Closing the Circle Awards for Environmental Stewardship Energy Department Receives Prestigious Closing the Circle Awards for Environmental Stewardship June 13, 2007 - 1:40pm Addthis DOE Won Four Out of Ten Civilian Awards WASHINGTON, DC - The Department of Energy (DOE) this week received four White House Closing the Circle (CTC) awards, which recognize federal leadership in green purchasing, electronics recycling, and energy efficiency practices. These awards are presented annually by the Office of the Federal Environmental Executive for outstanding achievements of Federal employees and their facilities for efforts that make a significant positive impact on environmental stewardship. "I am proud to accept these awards on behalf of all the employees of the

330

Argonne CNM Highlight: CNM scientist receives presidential award for  

NLE Websites -- All DOE Office Websites (Extended Search)

scientist receives presidential award for advancement of science scientist receives presidential award for advancement of science Yugang Sun receives a PECASE award Yugang Sun (left) with Dr. Altaf Carim, DOE program manager for the five Nanoscale Science Research Centers, during the December 19, 2008, PECASE award ceremony at DOE headquarters Assistant chemist Yugang Sun received the Presidential Early Career Award for Scientists and Engineers (PECASE) to recognize his contribution to the advancement of science. Dr. Sun, a member of the Nanophotonics Group in Argonne's Center for Nanoscale Materials, was recognized for developing ground-breaking techniques for chemical synthesis and nanofabrication of metal and semiconductor nanomaterials, as well as for community educational activities. The Presidential Awards are intended to recognize and nurture

331

Drell receives National Medal of Science | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Drell receives National Medal of Science | National Nuclear Security Drell receives National Medal of Science | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Drell receives National Medal of Science Drell receives National Medal of Science Posted By Office of Public Affairs NNSA Blog Sidney Drell, physicist, arms control expert and adviser, is one

332

Department of Energy Receives Highest Transportation Industry Safety Award  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Receives Highest Transportation Industry Receives Highest Transportation Industry Safety Award Department of Energy Receives Highest Transportation Industry Safety Award May 1, 2007 - 12:45pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today received the Transportation Community Awareness and Emergency Response (TRANSCAER) Chairman's Award, one of industry's highest transportation safety awards, for helping local communities in emergency preparedness and response. TRANSCAER is a voluntary national organization that assists communities in emergency preparedness and response. "I'm very proud that The Department of Energy has raised the bar for community-based transportation emergency preparedness," Secretary of Energy Samuel W. Bodman said. "Safety is our number one priority, and we will

333

Lempke receives Sandia Emergency Operations Center tour | National Nuclear  

National Nuclear Security Administration (NNSA)

receives Sandia Emergency Operations Center tour | National Nuclear receives Sandia Emergency Operations Center tour | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Lempke receives Sandia Emergency Operations Center tour Lempke receives Sandia Emergency Operations Center tour Posted By Office of Public Affairs NNSA Blog Brian Bielecki, Director & Facility Security Officer for Security &

334

Hanford Projects Receive Sustainability Awards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Receive Sustainability Awards Projects Receive Sustainability Awards Hanford Projects Receive Sustainability Awards June 7, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, WASH. - Hanford's Department of Energy offices and their contractors received special recognition Tuesday for their part in promoting sustainability. The Department of Energy's Office of Environmental Management in Washington D.C. selected 10 Hanford Site projects to be awarded for excellence in encouraging sustainability, conserving resources, and exemplifying the ideals set forth by Executive Order 13514. The Order was signed by President Barack Obama on October 5, 2009, and challenged federal agencies to make plans and lead by example in "environmental, energy, and economic

335

Alaska Native Communities Receive Technical Assistance for Local Clean  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Communities Receive Technical Assistance for Local Communities Receive Technical Assistance for Local Clean Energy Development Alaska Native Communities Receive Technical Assistance for Local Clean Energy Development April 29, 2013 - 3:08pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Obama Administration's efforts to help Tribal communities across the country enhance their energy security and build a sustainable energy future, the Energy Department and the Denali Commission today announced that five Alaska Native communities will receive technical expertise through the Strategic Technical Assistance Response Team (START) program. Building on five technical assistance awards made last year, the projects selected today will further accelerate local clean energy and energy efficiency projects that advance energy self-sufficiency

336

High-Temperature Falling-Particle Receiver (Fact Sheet)  

Science Conference Proceedings (OSTI)

Sandia National Laboratories is one of the 2012 SunShot CSP R&D awardee for their advanced receivers. This fact sheet explains the motivation, description, and impact of the project.

Not Available

2012-09-01T23:59:59.000Z

337

Advanced Low-Cost Receivers for Parabolic Troughs (Fact Sheet)  

Science Conference Proceedings (OSTI)

Norwich Technologies is one of the 2012 SunShot CSP R&D awardees for their advanced receivers. This fact sheet explains the motivation, description, and impact of the project.

Not Available

2012-09-01T23:59:59.000Z

338

Applications Received by DOE/FE to Export Domestically Produced...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applications Received by DOEFE to Export Domestically Produced LNG from the Lower-48 States (as of September 19, 2013) All Changes Since September 11, 2013 Update Are In Red 1...

339

High-Flux Microchannel Solar Receiver (Fact Sheet)  

Science Conference Proceedings (OSTI)

Oregon State University is one of the 2012 SunShot CSP R&D awardees for their advanced receivers. This fact sheet explains the motivation, description, and impact of the project.

Not Available

2012-09-01T23:59:59.000Z

340

Particle Receiver Integrated with Fluidized Bed (Fact Sheet)  

Science Conference Proceedings (OSTI)

National Renewable Energy Laboratory is one of the 2012 SunShot CSP R&D awardees for their advanced receivers. This fact sheet explains the motivation, description, and impact of the project.

Not Available

2012-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Local high school seniors receive Edward Teller science scholarships  

NLE Websites -- All DOE Office Websites (Extended Search)

3 For immediate release: 06052013 | NR-13-06-03 Local high school seniors receive Edward Teller science scholarships Linda A Lucchetti, LLNL, (925) 422-5815, lucchetti1@llnl.gov...

342

Modeling of solar receiver for cracking of liquid petroleum gas  

SciTech Connect

The paper presents the model of an industrial solar receiver/reactor for thermal cracking of liquid petroleum gas (LPG) at the typical temperature range of 800--850 C. The concentrated solar radiation enters the receiver located on the ground and provided with a compound parabolic concentrator (CPC) at the ceiling. This is achieved with a reflecting solar tower. The radiative model uses the classical concept of equivalent gray plane to represent a panel of 40 cracking tubes placed in parallel of a refractory wall of the receiver. The radiative flux distribution on each wall is calculated and the chemistry in each reactor tube is evaluated until convergence is achieved. The design of an industrial size receiver, its behavior, and performance have been evaluated using this model. The computer program based on this model was run for a variety of flow conditions, feed compositions, and pressures.

Segal, A.; Epstein, M. [Weizmann Inst. of Science, Rehovot (Israel). Solar Research Facilities Unit

1997-02-01T23:59:59.000Z

343

Applications Received by DOE/FE to Export Domestically Produced...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applications Received by DOEFE to Export Domestically Produced LNG from the Lower-48 States (as of August 7, 2013) All Changes Since July 12, 2013 Update Are In Red 1 Company...

344

SunShot Initiative: High-Efficiency Receivers for Supercritical...  

NLE Websites -- All DOE Office Websites (Extended Search)

cycle is also being explored. Innovation State-of-the-art solar receivers rely on air or molten salt as the working fluid. However, air has low thermal transfer properties and...

345

Argonne director Isaacs to receive Chicago Council on Science...  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne director Isaacs to receive Chicago Council on Science and Technology award June 13, 2013 Tweet EmailPrint ARGONNE, Ill. - Eric D. Isaacs, director of the U.S. Department of...

346

Physicist Jim Hammer receives prestigious Edward Teller Award  

NLE Websites -- All DOE Office Websites (Extended Search)

232013 Physicist Jim Hammer receives prestigious Edward Teller Award Breanna Bishop, LLNL, (925) 423-9802, bishop33@llnl.gov High Resolution Image Jim Hammer Jim Hammer, a...

347

LLNL'S Yuan Ping receives DOE Early Career Research Program Award  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL'S Yuan Ping receives DOE Early Career Research Program Award Breanna Bishop, LLNL, (925) 423-9802, bishop33@llnl.gov Printer-friendly Yuan Ping stands next to the target...

348

Idaho National Laboratory receives national recognition for Small...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Tim Jackson, 208-526-8484 INL Misty Benjamin, 208-526-5940 Idaho National Laboratory receives national recognition for Small Business Mentoring Program IDAHO FALLS The...

349

Energy Department Announces 61 Scientists to Receive Early Career Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 Scientists to Receive Early Career 61 Scientists to Receive Early Career Research Program Funding Energy Department Announces 61 Scientists to Receive Early Career Research Program Funding May 7, 2013 - 12:56pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Underscoring the Obama Administration's commitment to investing in innovation and the American workforce, Acting Secretary of Energy Daniel Poneman today announced that 61 scientists from across the nation will receive up to $15.3 million in funding for research as part of the Energy Department's Early Career Research Program. The effort, now in its fourth year, is designed to bolster the nation's scientific workforce by providing support to exceptional researchers during the crucial early career years, when many scientists do their most formative

350

Los Alamos National Laboratory employees receive Pollution Prevention  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees Receive Pollution Prevention Awards Employees Receive Pollution Prevention Awards Los Alamos National Laboratory employees receive Pollution Prevention Awards Nearly 400 employees on 47 teams received Pollution Prevention awards for protecting the environment and saving taxpayers more than $8 million. April 23, 2013 Molten plutonium in a crucible. The improved processing of old plutonium generates less than half of the waste of the former process. Molten plutonium in a crucible. The improved processing of old plutonium generates less than half of the waste of the former process. Contact Steve Sandoval Communications Office (505) 665-9206 Email The Pollution Prevention Awards are the result of people taking the initiative to improve their own operations. Protecting environment, saving taxpayer dollars

351

Pantexan receives Crime Stoppers volunteer award | National Nuclear...  

National Nuclear Security Administration (NNSA)

her dedication last week when she received the Board Member of the Year Award from the Texas Crime Stoppers Council, the first time the honor has gone to a board member from...

352

Hybrid solar central receiver for combined cycle power plant  

DOE Patents (OSTI)

A hybrid combined cycle power plant including a solar central receiver for receiving solar radiation and converting it to thermal energy. The power plant includes a molten salt heat transfer medium for transferring the thermal energy to an air heater. The air heater uses the thermal energy to preheat the air from the compressor of the gas cycle. The exhaust gases from the gas cycle are directed to a steam turbine for additional energy production.

Bharathan, Desikan (Lakewood, CO); Bohn, Mark S. (Golden, CO); Williams, Thomas A. (Arvada, CO)

1995-01-01T23:59:59.000Z

353

Hybrid solar central receiver for combined cycle power plant  

DOE Patents (OSTI)

A hybrid combined cycle power plant is described including a solar central receiver for receiving solar radiation and converting it to thermal energy. The power plant includes a molten salt heat transfer medium for transferring the thermal energy to an air heater. The air heater uses the thermal energy to preheat the air from the compressor of the gas cycle. The exhaust gases from the gas cycle are directed to a steam turbine for additional energy production. 1 figure.

Bharathan, D.; Bohn, M.S.; Williams, T.A.

1995-05-23T23:59:59.000Z

354

What determines the price received by farmers? The case of cocoa in Cameroon  

E-Print Network (OSTI)

2009) What determines the price received by farmers? TheBerkeley. What determines the price received by farmers? Thetheir impact on the prices received by the producers.

Bergaly Kamdem, Cyrille; Galtier, Franck; Gockowski, James; David-Benz, Hlne; Egg, Johny; Kamgnia Dia, Bernadette

2009-01-01T23:59:59.000Z

355

Mechanism of Hydrogen Formation in Solar Parabolic Trough Receivers  

SciTech Connect

Solar parabolic trough systems for electricity production are receiving renewed attention, and new solar plants are under construction to help meet the growing demands of the power market in the Western United States. The growing solar trough industry will rely on operating experience it has gained over the last two decades. Recently, researchers found that trough plants that use organic heat transfer fluids (HTF) such as Therminol VP-1 are experiencing significant heat losses in the receiver tubes. The cause has been traced back to the accumulation of excess hydrogen gas in the vacuum annulus that surrounds the steel receiver tube, thus compromising the thermal insulation of the receiver. The hydrogen gas is formed during the thermal decomposition of the organic HTF that circulates inside the receiver loop, and the installation of hydrogen getters inside the annulus has proven to be insufficient for controlling the hydrogen build-up over the lifetime of the receivers. This paper will provide an overview of the chemical literature dealing with the thermal decomposition of diphenyl oxide and biphenyl, the two constituents of Therminol VP-1.

Moens, L.; Blake, D. M.

2008-03-01T23:59:59.000Z

356

Data:59082e36-0f3c-4080-9fe0-f05db2cb814d | Open Energy Information  

Open Energy Info (EERE)

-0f3c-4080-9fe0-f05db2cb814d -0f3c-4080-9fe0-f05db2cb814d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Outdoor Recreational Lighting Rate Sector: Lighting Description: Availability: Applies for service in the new service territory acquired from Delmarva Power and Light Co. by the Cooperative and is available to non-profit organizations and local governmental entities where at least 90% of the total connected load is used for outdoor recreational lighting. Rates are subject to wholesale power cost adjustments.

357

Data:7080b19a-ec3c-4b53-bbc9-8711115cf7f6 | Open Energy Information  

Open Energy Info (EERE)

b19a-ec3c-4b53-bbc9-8711115cf7f6 b19a-ec3c-4b53-bbc9-8711115cf7f6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Carolinas, LLC (South Carolina) Effective date: 2012/10/01 End date if known: Rate name: Residential - RS Sector: Residential Description: Available only to residential customers in residences, condominiums, mobile homes, or individually-metered apartments which provide independent and permanent facilities complete for living, sleeping, eating, cooking, and sanitation. Source or reference: http://www.duke-energy.com/pdfs/SCScheduleRS.pdf Source Parent: Comments Applicability

358

Data:08ebcf38-175d-4583-a50c-3c4b17babf32 | Open Energy Information  

Open Energy Info (EERE)

8-175d-4583-a50c-3c4b17babf32 8-175d-4583-a50c-3c4b17babf32 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Company Owned Street Lighting - SHPS 100 W Developer contributed Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

359

Data:A68f2635-9cea-4083-abfa-0b3c3cc50319 | Open Energy Information  

Open Energy Info (EERE)

f2635-9cea-4083-abfa-0b3c3cc50319 f2635-9cea-4083-abfa-0b3c3cc50319 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Area Lighting MV 400 Watt Metered Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

360

Data:Adce7c69-e3c9-4984-9829-5e7ff0cc10eb | Open Energy Information  

Open Energy Info (EERE)

Adce7c69-e3c9-4984-9829-5e7ff0cc10eb Adce7c69-e3c9-4984-9829-5e7ff0cc10eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: Schedule 19: Municipal Street Lighting: Incandescent: 300 watt Sector: Lighting Description: Available to towns, villages, and communities within the District's Service Area for street lighting service from dusk to dawn. Source or reference: http://www.norrisppd.com/downloads/Schedule%2019%20-%20Municiapl%20Street%20Lighting.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:43427f05-c8da-4ac5-bc3b-3c9efc3b7f2e | Open Energy Information  

Open Energy Info (EERE)

f05-c8da-4ac5-bc3b-3c9efc3b7f2e f05-c8da-4ac5-bc3b-3c9efc3b7f2e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Electric Heat Suburban Commercial Sector: Commercial Description: To all customers for such service when separately metered upon application and approval of permanently installed equipment; subject to such rules and regulations as are established by the utility. When air conditioning is installed in an electrically heated area, it may be connected to the same meter for space conditioning purposes.

362

Data:F7ec3348-39dc-4f03-b713-7e178c4b6d3c | Open Energy Information  

Open Energy Info (EERE)

348-39dc-4f03-b713-7e178c4b6d3c 348-39dc-4f03-b713-7e178c4b6d3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Security Lighting Unmetered Lights 250W HPS-Flood Sector: Lighting Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

363

Data:Cf8e89dc-02b8-41da-b3ea-3c92b0e3113c | Open Energy Information  

Open Energy Info (EERE)

Cf8e89dc-02b8-41da-b3ea-3c92b0e3113c Cf8e89dc-02b8-41da-b3ea-3c92b0e3113c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: Security Lighting Service- SL (250W Flood) Sector: Lighting Description: To individual consumers for dusk to dawn out door lighting service in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

364

Data:6f121b5e-2a0c-4777-9efe-3c5b44d7871d | Open Energy Information  

Open Energy Info (EERE)

1b5e-2a0c-4777-9efe-3c5b44d7871d 1b5e-2a0c-4777-9efe-3c5b44d7871d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: GENERAL SERVICE Three Phase Sector: Commercial Description: AVAILABILITY: Electric service is available under this Schedule in the territory served by the Cooperative for nonresidential use with less than 100 kVA of transformer capacity. Resale and standby services are not permitted. Rates are subject to wholesale power cost adjustments, power factor adjustments,a North Carolina Sales Tax and Rider EE (Energy Efficiency Rider).

365

Data:4a7a5e51-bed8-4a67-a3c8-204210ed2554 | Open Energy Information  

Open Energy Info (EERE)

bed8-4a67-a3c8-204210ed2554 bed8-4a67-a3c8-204210ed2554 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wild Rice Electric Coop, Inc Effective date: 2012/03/18 End date if known: Rate name: VILLAGE RESIDENTIAL SERVICE - Up to 5 KVA transformer Sector: Residential Description: Source or reference: http://www.wildriceelectric.com/b-rate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

366

Data:Ec9e6a69-824c-438a-a3c1-629292832b19 | Open Energy Information  

Open Energy Info (EERE)

9-824c-438a-a3c1-629292832b19 9-824c-438a-a3c1-629292832b19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Residential 4C Sector: Residential Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

367

Data:9b27a143-a7be-4e04-8051-5ab3c49dccb1 | Open Energy Information  

Open Energy Info (EERE)

3-a7be-4e04-8051-5ab3c49dccb1 3-a7be-4e04-8051-5ab3c49dccb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-2 STATE HIGHWAY LIGHTING SERVICE-MERCURY VAPOR 250W Sector: Lighting Description: APPLICABILITY Applicable to service to state highway lighting installations where the customer owns and maintains the equipment and the District furnishes energy at one or more central points in accordance with special conditions set forth herein. Unmetered Service: For each kilowatt of lamp load . . . . . . . $22.30 Minimum charge at any one location . . . . . $ 5.00 Monthly Usage: 105kWh

368

Data:4d8380cf-6a3c-4b4a-814e-d0ac0210a41e | Open Energy Information  

Open Energy Info (EERE)

80cf-6a3c-4b4a-814e-d0ac0210a41e 80cf-6a3c-4b4a-814e-d0ac0210a41e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stillwater Utilities Authority Effective date: 2012/01/01 End date if known: Rate name: ELECTRIC RATE OUTDOOR SECURITY LIGHTING MV 175W Sector: Lighting Description: This lighting fixture is no longer available for new installations. The Fixed Monthly Charge applies to Existing Distribution on Wood Poles. Additional Charges: If an extension of SEU's secondary circuit and a pole was necessary for the area security light, the monthly rate below shall be increased for each security light as follows:

369

Data:A4ddefe0-db39-48c0-ac98-7941b3451e3c | Open Energy Information  

Open Energy Info (EERE)

ddefe0-db39-48c0-ac98-7941b3451e3c ddefe0-db39-48c0-ac98-7941b3451e3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Curtailable Electric Rates C-1 Sector: Commercial Description: This rate is applicable to all non-residential customers whose highest annual peak demand exceeds 50 KW. Subject to Power Cost Adjustment (PCA). Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

370

Data:4ad19850-86a9-40d8-be52-3c447a057189 | Open Energy Information  

Open Energy Info (EERE)

-86a9-40d8-be52-3c447a057189 -86a9-40d8-be52-3c447a057189 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting Municipal Owned Lights 400W 15000LMV Sector: Lighting Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

371

Data:B721bd4d-6c3a-4595-a91e-5a50c7c3c275 | Open Energy Information  

Open Energy Info (EERE)

d-6c3a-4595-a91e-5a50c7c3c275 d-6c3a-4595-a91e-5a50c7c3c275 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: Dusk-To-Dawn Lighting- UnMetered 400 W Luminaires (October 2013) Sector: Lighting Description: Applicable to any customer for private or public outdoor lighting service, whether unmetered and provided by the city, or metered. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

372

Data:408684f1-cc3e-4c8b-a3c2-e331c0e78277 | Open Energy Information  

Open Energy Info (EERE)

f1-cc3e-4c8b-a3c2-e331c0e78277 f1-cc3e-4c8b-a3c2-e331c0e78277 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: Schedule "R-7" Sector: Commercial Description: Applicable to permanent full-time consumers and use incidental thereto, and at one standard voltage. The capacity of individual motors served under the Schedule shall not exceed 10 horsepower. No service rendered hereunder may be resold or transmitted to other premises, either directly or indirectly, without expressed consent of the Cooperative.

373

Data:F4ee18d1-1910-4d84-ab53-79ba79489b3c | Open Energy Information  

Open Energy Info (EERE)

ee18d1-1910-4d84-ab53-79ba79489b3c ee18d1-1910-4d84-ab53-79ba79489b3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2005/09/28 End date if known: Rate name: 2 High load factor service (HLFS) (primary voltage)(transmission 69/138 kV voltage) Sector: Industrial Description: This rate is applicable under the regular terms and conditions of company to customers who contract for not less then 2500 kW of electric service at company's available line voltage. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_lps.pdf

374

Data:5acb3b2c-0e55-48f9-80ed-3c80c195f680 | Open Energy Information  

Open Energy Info (EERE)

b2c-0e55-48f9-80ed-3c80c195f680 b2c-0e55-48f9-80ed-3c80c195f680 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OL - Outdoor Lighting 150 watt sodium vapor Sector: Lighting Description: Availability Available only for continuous year-round service for outdoor lighting to any residential, farm, commercial or industrial customer located adjacent to an electric distribution line of Utility. Character of Service Outdoor Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html

375

Data:9257ab3c-b68c-4223-9f24-b803fb930852 | Open Energy Information  

Open Energy Info (EERE)

7ab3c-b68c-4223-9f24-b803fb930852 7ab3c-b68c-4223-9f24-b803fb930852 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Blue Earth, Minnesota (Utility Company) Effective date: End date if known: Rate name: Security Light: 250w Sector: Lighting Description: Source or reference: http://www.belw.org/Rate Source Parent: Comments cost is per fixture per month Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

376

Data:3b00cdd8-030d-4261-aa09-9ae783ae3c15 | Open Energy Information  

Open Energy Info (EERE)

cdd8-030d-4261-aa09-9ae783ae3c15 cdd8-030d-4261-aa09-9ae783ae3c15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 250 W HPS Street Lighting, Metered Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Streetlights supported on distribution type wood poles from Cooperative-owned overhead or underground system. Rate when light is Metered through customer's service. Source or reference: Rate binder # 4(Illinios State University)

377

Data:1fe29ef0-91ee-4ab5-924d-b3c7ea445dd6 | Open Energy Information  

Open Energy Info (EERE)

fe29ef0-91ee-4ab5-924d-b3c7ea445dd6 fe29ef0-91ee-4ab5-924d-b3c7ea445dd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (Incandescent Luminaire 2500 L) Sector: Commercial Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf

378

Data:9520a388-400e-45e9-b645-8e3c83837b69 | Open Energy Information  

Open Energy Info (EERE)

8-400e-45e9-b645-8e3c83837b69 8-400e-45e9-b645-8e3c83837b69 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2001/07/01 End date if known: Rate name: 60 TOU-2 Time of Use Sector: Description: Available to non-residential Consumers requiring three phase service with a transformer capacity of 1000kVA or more, subject to Association's established rules and regulations. This rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others.

379

Data:6ff41894-1942-46b7-97da-23301ee7fa3c | Open Energy Information  

Open Energy Info (EERE)

-1942-46b7-97da-23301ee7fa3c -1942-46b7-97da-23301ee7fa3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seneca, South Carolina (Utility Company) Effective date: End date if known: Rate name: Commercial Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/628/Seneca%20Light%20and%20Water.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

380

Data:187059d1-e799-4c86-ab62-1c22cf3c8013 | Open Energy Information  

Open Energy Info (EERE)

e799-4c86-ab62-1c22cf3c8013 e799-4c86-ab62-1c22cf3c8013 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: INSTITIONAL SERVICE RATE 120000 NON ELECTRIC Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:9fb6b5cd-2025-477e-a609-a7d1a5aa3c33 | Open Energy Information  

Open Energy Info (EERE)

cd-2025-477e-a609-a7d1a5aa3c33 cd-2025-477e-a609-a7d1a5aa3c33 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/12/19 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-High Pressure Sodium 100W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements.

382

Data:67083cb0-ba3c-45bf-a5d3-621aca26ae1b | Open Energy Information  

Open Energy Info (EERE)

cb0-ba3c-45bf-a5d3-621aca26ae1b cb0-ba3c-45bf-a5d3-621aca26ae1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Residential- All Electric Sector: Residential Description: Available only to residences, condominiums, mobile homes, or individually-metered apartments, in which the energy required for all water heating, cooking, and environmental space conditioning is supplied electrically. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent:

383

Data:47abea3c-bde9-4708-8a1f-a955c4098614 | Open Energy Information  

Open Energy Info (EERE)

abea3c-bde9-4708-8a1f-a955c4098614 abea3c-bde9-4708-8a1f-a955c4098614 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/08/22 End date if known: Rate name: RATE NO. 03 LARGE COMMERCIAL SERVICE-Underground Primary Service Sector: Industrial Description: Applicability: To commercial customers whose monthly maximum demand is greater than 50kW for three(3) consecutive months in any continuous twelve(12) month period ending with the current month. Service is applied at one point of delivery and measured through one meter with a demand reading.

384

Data:02e4e3c2-473a-46bd-bc30-227358c2ea8f | Open Energy Information  

Open Energy Info (EERE)

e3c2-473a-46bd-bc30-227358c2ea8f e3c2-473a-46bd-bc30-227358c2ea8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Metered New Pole HPS 400 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

385

Data:Fed3f322-10d8-41c2-9055-d2981c3c3d53 | Open Energy Information  

Open Energy Info (EERE)

Fed3f322-10d8-41c2-9055-d2981c3c3d53 Fed3f322-10d8-41c2-9055-d2981c3c3d53 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service Three-Phase Sector: Residential Description: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Rg-1 Residential Service $1.00 per customer per month Source or reference: http://www.algomautilities.com/media/Electric_Rate_Tariff_Sheets.pdf

386

Data:33c55341-9843-4345-9c7b-228f082c8d3c | Open Energy Information  

Open Energy Info (EERE)

341-9843-4345-9c7b-228f082c8d3c 341-9843-4345-9c7b-228f082c8d3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp-Post Top Luminaire (175w) Colonial Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

387

Data:6436c5eb-84b0-4e62-991e-e3bcd810db3c | Open Energy Information  

Open Energy Info (EERE)

eb-84b0-4e62-991e-e3bcd810db3c eb-84b0-4e62-991e-e3bcd810db3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntingburg, Indiana (Utility Company) Effective date: 2007/01/01 End date if known: Rate name: Municipal Street Lighting- (Mercury 175 W Security) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

388

Data:097eb70e-a3c0-4916-b0ac-837224a0797c | Open Energy Information  

Open Energy Info (EERE)

e-a3c0-4916-b0ac-837224a0797c e-a3c0-4916-b0ac-837224a0797c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-2 STATE HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 70W Sector: Lighting Description: APPLICABILITY Applicable to service to state highway lighting installations where the customer owns and maintains the equipment and the District furnishes energy at one or more central points in accordance with special conditions set forth herein. Unmetered Service: For each kilowatt of lamp load . . . . . . . $22.30 Minimum charge at any one location . . . . . $ 5.00 Monthly Usage: 35kWh

389

Data:E8625c5a-3c0c-48e6-a728-0292cd3b28f2 | Open Energy Information  

Open Energy Info (EERE)

25c5a-3c0c-48e6-a728-0292cd3b28f2 25c5a-3c0c-48e6-a728-0292cd3b28f2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Security Lighting - 200 watt HPS - Existing Pole Sector: Lighting Description: * Single phase at available voltage. Available for automatic dusk-to-dawn lighting when cooperative furnishes all material, maintenance and electric energy. Source or reference: http://www.sunriverelectric.coop/Membership/Billing_Rates_and_Fees/Security_Lighting/index.html Source Parent: Comments Applicability Demand (kW)

390

Data:8bb186f5-3c77-45d0-8366-872069957ae1 | Open Energy Information  

Open Energy Info (EERE)

f5-3c77-45d0-8366-872069957ae1 f5-3c77-45d0-8366-872069957ae1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Grantville, Georgia (Utility Company) Effective date: End date if known: Rate name: Security/ Street-Monthly 1000 W MH Sector: Lighting Description: Source or reference: Rate Binder#2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

391

Data:Ab8ab0de-9670-41d7-8c61-a3c35d93fa51 | Open Energy Information  

Open Energy Info (EERE)

de-9670-41d7-8c61-a3c35d93fa51 de-9670-41d7-8c61-a3c35d93fa51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Glouster, Ohio (Utility Company) Effective date: 2003/03/01 End date if known: Rate name: Small Commercial 3-Phase Sector: Commercial Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

392

Data:B4bbcb8c-862d-41b0-a8de-3c9f453b19ff | Open Energy Information  

Open Energy Info (EERE)

bbcb8c-862d-41b0-a8de-3c9f453b19ff bbcb8c-862d-41b0-a8de-3c9f453b19ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Periodic High pressure sodium- 150 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

393

Data:B1426e3c-0e0b-4a55-be94-d0221bfe8c25 | Open Energy Information  

Open Energy Info (EERE)

e3c-0e0b-4a55-be94-d0221bfe8c25 e3c-0e0b-4a55-be94-d0221bfe8c25 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bonneville Power Admin Effective date: 2011/10/01 End date if known: 2013/09/30 Rate name: IP - 12 Sector: Industrial Description: This schedule is available to BPA's direct service industrial Customers (DSIs), as defined by the Northwest Power Act, for firm power to be used in their industrial operations in the Pacific Northwest. Industrial Firm Power (IP) is available under Northwest Power Act section 5(d) contracts to DSIs for direct consumption. Source or reference: http://www.bpa.gov/Power/PSP/rates/current.shtml

394

Data:C1409861-b564-4c10-b6f9-3c6aac33eccb | Open Energy Information  

Open Energy Info (EERE)

61-b564-4c10-b6f9-3c6aac33eccb 61-b564-4c10-b6f9-3c6aac33eccb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Security Lamps 175 W MVL Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

395

Data:78c0e937-3ecd-4645-8a89-3c9a4af9a913 | Open Energy Information  

Open Energy Info (EERE)

7-3ecd-4645-8a89-3c9a4af9a913 7-3ecd-4645-8a89-3c9a4af9a913 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Memb Owns/Repairs HPS 400 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

396

Data:7f6a14ad-4d86-4706-ac3c-e4f140e3e42f | Open Energy Information  

Open Energy Info (EERE)

ad-4d86-4706-ac3c-e4f140e3e42f ad-4d86-4706-ac3c-e4f140e3e42f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting - Shoebox 400 Watt HPS Sector: Residential Description: Source or reference: https://www.santeecooper.com/business/equipment-leases/outdoor-lighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

397

Data:A497b42f-3c89-425f-8491-ecaa43be1829 | Open Energy Information  

Open Energy Info (EERE)

f-3c89-425f-8491-ecaa43be1829 f-3c89-425f-8491-ecaa43be1829 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.tpud.org/about_rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

398

Data:4a04ccaa-8c79-4629-b109-71f30c3c6dc3 | Open Energy Information  

Open Energy Info (EERE)

ccaa-8c79-4629-b109-71f30c3c6dc3 ccaa-8c79-4629-b109-71f30c3c6dc3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Street Lights (Muncipal Owned) 1000 W HPS, Metal pole Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

399

Data:8980c0d2-3c6d-473a-96ea-2dd523e36c65 | Open Energy Information  

Open Energy Info (EERE)

d2-3c6d-473a-96ea-2dd523e36c65 d2-3c6d-473a-96ea-2dd523e36c65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Metered Existing Pole HPS 150 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

400

Data:5461483a-3dce-4e3c-94dc-1e0da50ccf93 | Open Energy Information  

Open Energy Info (EERE)

1483a-3dce-4e3c-94dc-1e0da50ccf93 1483a-3dce-4e3c-94dc-1e0da50ccf93 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Sec A 40 Watt 21 kWh Sector: Lighting Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Monthly Charge= Controlled Energy Charge+ Continuous burning charge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:F7984013-dc01-448f-8e3c-16a302b33d1a | Open Energy Information  

Open Energy Info (EERE)

dc01-448f-8e3c-16a302b33d1a dc01-448f-8e3c-16a302b33d1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Altamont, Kansas (Utility Company) Effective date: 2008/12/30 End date if known: Rate name: Residential Service Sector: Residential Description: Source or reference: Ted Binder 2 Source Parent: Comments Does not include the cost of electricity provided to the city of Altamont. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

402

Data:Baa39015-3322-4095-b94f-e95209a3c61d | Open Energy Information  

Open Energy Info (EERE)

Baa39015-3322-4095-b94f-e95209a3c61d Baa39015-3322-4095-b94f-e95209a3c61d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (1700-1799 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

403

Data:B37ad405-1bd7-40e7-9478-baf3c053a57e | Open Energy Information  

Open Energy Info (EERE)

05-1bd7-40e7-9478-baf3c053a57e 05-1bd7-40e7-9478-baf3c053a57e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Street Lighting Service - Option A - 100 W MH Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. Option A: Utility Owned and Maintained. Power Cost Adjustment Clause: Charge per all kWh varies monthly. See schedule PCAC. Note: HPS = High Pressure Sodium MH = Metal Halide Source or reference: http://www.algomautilities.com/media/Electric_Rate_Tariff_Sheets.pdf

404

Data:5caf87fa-718b-4bf0-871e-92f44b5cdc3c | Open Energy Information  

Open Energy Info (EERE)

fa-718b-4bf0-871e-92f44b5cdc3c fa-718b-4bf0-871e-92f44b5cdc3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Cobrahead- MV 400 Watt Gray Sector: Lighting Description: Source or reference: http://en.openei.org/wiki/Special:FormEdit/Utility_Rate_Namer Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

405

Data:14dbdd72-9fe6-4a3c-850e-a806a13eccef | Open Energy Information  

Open Energy Info (EERE)

dbdd72-9fe6-4a3c-850e-a806a13eccef dbdd72-9fe6-4a3c-850e-a806a13eccef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, North Carolina (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Area Lighting- 400W Mercury Vapor Sector: Lighting Description: Available to the individual Customer at locations on the City's distribution system. Source or reference: http://www.lexingtonnc.net/publicutilities/downloads/Current%20Electric%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

406

Data:Fe881325-eb71-45ad-a4cd-f2fe3c28f436 | Open Energy Information  

Open Energy Info (EERE)

325-eb71-45ad-a4cd-f2fe3c28f436 325-eb71-45ad-a4cd-f2fe3c28f436 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange County Rural E M C Effective date: 2012/01/01 End date if known: Rate name: Rate 101- 2012 Rate Schedule for Standard Service Sector: Residential Description: Wholesale Power Cost Tracker changes quarterly. Available to any member of the REMC located on its lines for standard service whose installed capacity does not exceed 50KVA. Source or reference: http://www.orangecountyremc.org/electricrates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

407

Data:Da62642a-729c-4c5c-9850-669cb6c3c4c5 | Open Energy Information  

Open Energy Info (EERE)

Da62642a-729c-4c5c-9850-669cb6c3c4c5 Da62642a-729c-4c5c-9850-669cb6c3c4c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Interruptible Power - Discretionary(primary voltage)-supplemental interruptions Sector: Industrial Description: Service pursuant to this schedule is available to customers that have provided reasonable evidence to the Company that their electric service can be interrupted within a 10-minute notice period. Customers shall contract for electrical capacity sufficient to meet normal maximum requirements but not

408

Data:532de819-e2ff-4c78-9689-3996c3c8dc07 | Open Energy Information  

Open Energy Info (EERE)

19-e2ff-4c78-9689-3996c3c8dc07 19-e2ff-4c78-9689-3996c3c8dc07 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (200 or less local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

409

Data:5a9e11ab-f3dc-45a6-bb11-b12f3c380de8 | Open Energy Information  

Open Energy Info (EERE)

e11ab-f3dc-45a6-bb11-b12f3c380de8 e11ab-f3dc-45a6-bb11-b12f3c380de8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MV 175 W Underground (Includes Pole) Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability

410

Data:F21d2925-dc0b-4621-ba28-3c8633e10eae | Open Energy Information  

Open Energy Info (EERE)

25-dc0b-4621-ba28-3c8633e10eae 25-dc0b-4621-ba28-3c8633e10eae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clarksville Light & Water Co Effective date: End date if known: Rate name: Large Industrial (Rate schedule p) Sector: Industrial Description: For electric service required by customer on the premises supplied through one point of delivery. Not applicable to resale, shared, standby or supplementary service. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/20/Clarksville%20Light%20and%20Water%20Plant,%20AR.pdf

411

Data:853f6ea0-a3c2-4bc4-85a4-7c057688746d | Open Energy Information  

Open Energy Info (EERE)

ea0-a3c2-4bc4-85a4-7c057688746d ea0-a3c2-4bc4-85a4-7c057688746d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Unmetered Security Light - 175 MV Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

412

Data:Cef06c3c-d989-4239-a286-9e82977c9471 | Open Energy Information  

Open Energy Info (EERE)

Cef06c3c-d989-4239-a286-9e82977c9471 Cef06c3c-d989-4239-a286-9e82977c9471 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: Schedule 19: Municipal Street Lighting: Incandescent: 200 watt Sector: Lighting Description: Available to towns, villages, and communities within the District's Service Area for street lighting service from dusk to dawn. Source or reference: http://www.norrisppd.com/downloads/Schedule%2019%20-%20Municiapl%20Street%20Lighting.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

413

Data:E03a3659-ae3c-4581-a60b-4caa2bc7960e | Open Energy Information  

Open Energy Info (EERE)

9-ae3c-4581-a60b-4caa2bc7960e 9-ae3c-4581-a60b-4caa2bc7960e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Wellington, Ohio (Utility Company) Effective date: 2010/04/05 End date if known: Rate name: Residential Service Sector: Residential Description: Available to residential, farm and home consumers where single phase service though one meter serves on family unit. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

414

Data:B0f8cf1f-9675-4c3c-85ba-a97573938074 | Open Energy Information  

Open Energy Info (EERE)

f-9675-4c3c-85ba-a97573938074 f-9675-4c3c-85ba-a97573938074 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Large Power Contract Off-Peak Daily Primary Sector: Description: Excess kVA Source or reference: http://www.les.com/your_business/rate_schedules_lpc.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

415

Data:F68c8dfb-471c-431b-9987-3c8ea3d7d0c4 | Open Energy Information  

Open Energy Info (EERE)

dfb-471c-431b-9987-3c8ea3d7d0c4 dfb-471c-431b-9987-3c8ea3d7d0c4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: Delte Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications. Source or reference: ISU Documentation

416

Data:D5a43f59-4e6a-4e52-aca6-f88c3c87defd | Open Energy Information  

Open Energy Info (EERE)

f59-4e6a-4e52-aca6-f88c3c87defd f59-4e6a-4e52-aca6-f88c3c87defd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Security Lights: Standard Overhead 100 Watt HPS Sector: Lighting Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

417

Data:Be73ca1d-0905-4b49-b287-39a3c9050c63 | Open Energy Information  

Open Energy Info (EERE)

ca1d-0905-4b49-b287-39a3c9050c63 ca1d-0905-4b49-b287-39a3c9050c63 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russellville, Kentucky (Utility Company) Effective date: End date if known: Rate name: 400W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.russepb.com/rates.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

418

Data:909b04b3-9fe7-432e-a388-3c76aa76dc06 | Open Energy Information  

Open Energy Info (EERE)

4b3-9fe7-432e-a388-3c76aa76dc06 4b3-9fe7-432e-a388-3c76aa76dc06 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nashville Electric Service Effective date: 2013/04/01 End date if known: Rate name: General Power 2 Commercial Sector: Commercial Description: * This rate shall apply to the firm power requirements (where a customer's contract demand is 5,000 kW or less) for electric service to commercial, industrial, and governmental customers, and to institutional customers including, without limitation, churches, clubs, fraternities, orphanages, nursing homes, rooming or boarding houses, and like customers.

419

Data:05070b10-3c15-4871-8021-7ea15a4bea96 | Open Energy Information  

Open Energy Info (EERE)

3c15-4871-8021-7ea15a4bea96 3c15-4871-8021-7ea15a4bea96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: High Voltage Delivery Rate Sector: Industrial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

420

Data:4f710f6f-ae57-4646-a3be-3c84f79eb0bf | Open Energy Information  

Open Energy Info (EERE)

f-ae57-4646-a3be-3c84f79eb0bf f-ae57-4646-a3be-3c84f79eb0bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Ludlow, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 06 General Service Three Phase Sector: Description: Source or reference: ISU Documentation DOE Sharepoint Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:1c48362d-247b-4006-84db-20a0e048d3c8 | Open Energy Information  

Open Energy Info (EERE)

362d-247b-4006-84db-20a0e048d3c8 362d-247b-4006-84db-20a0e048d3c8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Star Electric Coop, Inc Effective date: End date if known: Rate name: Large Power Sector: Industrial Description: Source or reference: http://www.northstarelectric.coop/wordpress/wp-content/uploads/2012/04/Rates2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

422

Data:B6bb7bc5-8367-44ea-987f-44515b3c600d | Open Energy Information  

Open Energy Info (EERE)

bc5-8367-44ea-987f-44515b3c600d bc5-8367-44ea-987f-44515b3c600d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Rio Arriba E Coop Inc Effective date: 2012/02/19 End date if known: Rate name: Large Commercial Time of Use-16 (PRC Rate No. 16) Sector: Industrial Description: Source or reference: http://www.noraelectric.org/rates/rates.cfm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

423

Data:Bcdc4a3c-0ceb-4c72-b807-959114939ac3 | Open Energy Information  

Open Energy Info (EERE)

Bcdc4a3c-0ceb-4c72-b807-959114939ac3 Bcdc4a3c-0ceb-4c72-b807-959114939ac3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decashield HPS 250 W Wood Pole Sector: Lighting Description: Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

424

Data:71614ce0-3c26-45bf-9eae-c994b481fb24 | Open Energy Information  

Open Energy Info (EERE)

ce0-3c26-45bf-9eae-c994b481fb24 ce0-3c26-45bf-9eae-c994b481fb24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Residential (KW11) Sector: Residential Description: Apartments and dwellings providing domestic accommodations for an individual family. Applicable to residential users with summer usages less than 700 KWH in any month. Source or reference: http://publicutilities.columbus.gov/WorkArea/linkit.aspx?LinkIdentifier=id&ItemID=45273 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

425

Data:4ddb4011-4c3f-45f5-aea6-c8bb3c2bcaed | Open Energy Information  

Open Energy Info (EERE)

ddb4011-4c3f-45f5-aea6-c8bb3c2bcaed ddb4011-4c3f-45f5-aea6-c8bb3c2bcaed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule D Residential Service Sector: Residential Description: Applicability This Schedule is applicable to individual family accommodations devoted primarily to residential, household and related purposes (as distinguished from commercial, professional and industrial purposes), to general farm service on a farm, where the residence on such farm is supplied through the same meter, and to public dwelling units as provided in Special Provision 1.

426

Data:E6c19a79-d570-41f7-9521-25e4d3c67467 | Open Energy Information  

Open Energy Info (EERE)

a79-d570-41f7-9521-25e4d3c67467 a79-d570-41f7-9521-25e4d3c67467 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: UL23 - MV 175W Sector: Lighting Description: AVAILABILITY This schedule is available to individual members located on the Cooperative's distribution system. Mercury vapor lights are only available at existing locations. RATE - MONTHLY All night outdoor lighting service using underground conductors and the Cooperative's standard lighting package equipment mounted on 30-foot Class 6, treated pine poles requiring 150 feet or less of secondary underground conductor.

427

Data:52024bf6-9f08-4018-a00c-13b3c173db41 | Open Energy Information  

Open Energy Info (EERE)

bf6-9f08-4018-a00c-13b3c173db41 bf6-9f08-4018-a00c-13b3c173db41 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Electric Coop, Inc Effective date: 2012/04/01 End date if known: Rate name: RATE BR12 Air Conditioning (Commercial) Sector: Commercial Description: Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

428

Data:Ec781b6b-cd43-4028-b51d-3c1b115ed6ab | Open Energy Information  

Open Energy Info (EERE)

b6b-cd43-4028-b51d-3c1b115ed6ab b6b-cd43-4028-b51d-3c1b115ed6ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2012/01/01 End date if known: Rate name: GSS_T Sector: Residential Description: Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

429

Data:B7c7d80c-bf58-466f-82bb-566ac3c36af0 | Open Energy Information  

Open Energy Info (EERE)

d80c-bf58-466f-82bb-566ac3c36af0 d80c-bf58-466f-82bb-566ac3c36af0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Street Lighting-180 Watt LPS Sector: Commercial Description: *Applicable for lighting public streets,alleys and public parks. Subject to tax and wholesale power cost. Source or reference: http://www.trico.coop/images/TRICO_SL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

430

Data:0ec1745f-9188-4f39-b3c6-28537c82bf4e | Open Energy Information  

Open Energy Info (EERE)

f-9188-4f39-b3c6-28537c82bf4e f-9188-4f39-b3c6-28537c82bf4e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/11/21 End date if known: Rate name: Alternative Electric Metal Melting 120 kv Transmission Sector: Industrial Description: Source or reference: www.dteenergy.com/pdfs/detroitEdisonTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

431

Data:1b2efb80-964b-4853-add3-c2cf5221b66f | Open Energy Information  

Open Energy Info (EERE)

efb80-964b-4853-add3-c2cf5221b66f efb80-964b-4853-add3-c2cf5221b66f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service Single-Phase Sector: Residential Description: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Rg-1 Residential Service $1.00 per customer per month Source or reference: http://www.algomautilities.com/media/Electric_Rate_Tariff_Sheets.pdf

432

Data:4513176c-0d08-4d0f-8493-fedb3c8d0965 | Open Energy Information  

Open Energy Info (EERE)

6c-0d08-4d0f-8493-fedb3c8d0965 6c-0d08-4d0f-8493-fedb3c8d0965 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2012/04/01 End date if known: Rate name: Parallel Generation Rate Time of Day Purchase Rate Residential Sector: Residential Description: Less than 40 KW Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

433

Data:A5525e2d-0a3c-4be2-805d-34f790026c3f | Open Energy Information  

Open Energy Info (EERE)

25e2d-0a3c-4be2-805d-34f790026c3f 25e2d-0a3c-4be2-805d-34f790026c3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Incandescent Lighting Charges(175 W MV) Sector: Lighting Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

434

Data:Dac2c1f5-0271-46f2-bb3c-9e80813dbec3 | Open Energy Information  

Open Energy Info (EERE)

Dac2c1f5-0271-46f2-bb3c-9e80813dbec3 Dac2c1f5-0271-46f2-bb3c-9e80813dbec3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL " MV 175 Watt (Open Bottom) 70 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

435

Data:4687a1d7-e205-408e-b3c5-feaba8b03e2d | Open Energy Information  

Open Energy Info (EERE)

d7-e205-408e-b3c5-feaba8b03e2d d7-e205-408e-b3c5-feaba8b03e2d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Security Light Pole Only (Steel Pole) Sector: Lighting Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

436

Data:42965f56-177c-4e3c-babd-8eb99ea39368 | Open Energy Information  

Open Energy Info (EERE)

6-177c-4e3c-babd-8eb99ea39368 6-177c-4e3c-babd-8eb99ea39368 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (200 HPS Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

437

Data:20e41de3-c072-47b8-8808-7c4162dd7cc0 | Open Energy Information  

Open Energy Info (EERE)

de3-c072-47b8-8808-7c4162dd7cc0 de3-c072-47b8-8808-7c4162dd7cc0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oklahoma Electric Coop Inc Effective date: 2012/01/01 End date if known: Rate name: Commercial Time-of-Peak Secondary Service Sector: Commercial Description: To members located on or near Cooperative's distribution lines for commercial and industrial usage, subject to the established Terms and Conditions of the Cooperative. This schedule is not applicable to breakdown, standby, supplementary or resale service. Source or reference: http://www.okcoop.org/services/rates.aspx Source Parent:

438

Data:D3cc486d-f051-4418-a189-7bfeac997a3c | Open Energy Information  

Open Energy Info (EERE)

86d-f051-4418-a189-7bfeac997a3c 86d-f051-4418-a189-7bfeac997a3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2011/12/01 End date if known: Rate name: Power-Agriculture- Schedule PA Sector: Commercial Description: Applicability to power service for general agricultural purposes, or for general water or sewerage pumping. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-PA.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

439

Data:3d10ec32-c068-4540-89e0-3c1ade101c9a | Open Energy Information  

Open Energy Info (EERE)

ec32-c068-4540-89e0-3c1ade101c9a ec32-c068-4540-89e0-3c1ade101c9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Small Industrial Sector: Industrial Description: Small Industrial Energy Charge is the Commercial Electric Rate with a special minimum and choice of Demand Rate. This Small Industrial Energy Charge is for typical monthly use of less than 9,000 KWH. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

440

Data:B771ed8b-cf13-4864-9737-b3c57f8f016c | Open Energy Information  

Open Energy Info (EERE)

ed8b-cf13-4864-9737-b3c57f8f016c ed8b-cf13-4864-9737-b3c57f8f016c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2009/01/01 End date if known: Rate name: SECURITY LIGHTING(175 Watt Mercury Vapor) Sector: Lighting Description: At all locations whenever the service can be provided with overhead wiring on an existing RPU owned pole. Source or reference: http://www.rpu.org/documents/2012_rate_schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:Fe291b04-ee26-44f5-85cf-8316a3c538ab | Open Energy Information  

Open Energy Info (EERE)

4-ee26-44f5-85cf-8316a3c538ab 4-ee26-44f5-85cf-8316a3c538ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Rural Electric Coop Inc Effective date: 2012/10/01 End date if known: Rate name: Emergency Warning Systems Sector: Commercial Description: Available to all governmental entities for emergency warning systems such as sirens,for the purpose of alerting the general public of emergencies. The standard service shall be a 200ammp overhead service. Source or reference: Rate Binder#8(Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

442

Data:Cb06dd46-7b3c-4605-9f2b-271539977db0 | Open Energy Information  

Open Energy Info (EERE)

6dd46-7b3c-4605-9f2b-271539977db0 6dd46-7b3c-4605-9f2b-271539977db0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Blue Earth, Minnesota (Utility Company) Effective date: End date if known: Rate name: Industrial Electric Sector: Industrial Description: Source or reference: http://www.belw.org/Rate Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

443

Data:E70650df-5370-41fb-a364-699a373e3c1c | Open Energy Information  

Open Energy Info (EERE)

E70650df-5370-41fb-a364-699a373e3c1c E70650df-5370-41fb-a364-699a373e3c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Street Lighting- 250W HPS- Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish,install, and maintain street lighting units. This rate is subject to the Power Cost Adjustment Clause. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=6490 Source Parent: Comments Applicability Demand (kW)

444

Data:0d9f45c7-338c-4090-bd46-db3c9e2a8607 | Open Energy Information  

Open Energy Info (EERE)

f45c7-338c-4090-bd46-db3c9e2a8607 f45c7-338c-4090-bd46-db3c9e2a8607 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burbank Water and Power, California (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Service - Optional TOU Rate for Electric Vehicle Owners Sector: Residential Description: Source or reference: burbankca.gov/home/showdocument?id=20930 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

445

Data:F1983099-90dc-4b12-a937-bc3c29638f2d | Open Energy Information  

Open Energy Info (EERE)

99-90dc-4b12-a937-bc3c29638f2d 99-90dc-4b12-a937-bc3c29638f2d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Carmel Public Utility Co Effective date: End date if known: Rate name: Residential Sector: Residential Description: AVAILABILITY Available for any customer for Company's standard service for residential purposes. Where a residence and business are combined in one premise, the service classification shall be determined by the predominant electric use at the premise. Source or reference: http://www.mtcpu.com/includes/tariff_electric.htm?t=Residential_Electric_Service Source Parent:

446

Data:Ca686e26-dc3c-439c-9f46-fb741a0a1ff5 | Open Energy Information  

Open Energy Info (EERE)

dc3c-439c-9f46-fb741a0a1ff5 dc3c-439c-9f46-fb741a0a1ff5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE CO2I - Coincident Peak Rate 08-2I Sector: Commercial Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

447

Data:80882958-7f02-4b76-a33b-3c890be31843 | Open Energy Information  

Open Energy Info (EERE)

8-7f02-4b76-a33b-3c890be31843 8-7f02-4b76-a33b-3c890be31843 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Rate S1- Security Lights- (175W HPS) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

448

Data:0b8f2191-1e00-47df-aaaa-7706f3c8d09d | Open Energy Information  

Open Energy Info (EERE)

1e00-47df-aaaa-7706f3c8d09d 1e00-47df-aaaa-7706f3c8d09d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate OL - Outdoor Lighting Service - MV 400 Watts - Flood Sector: Lighting Description: Applicable for outdoor lighting services on private property with Company owned fixtures in the Company's entire service area where secondary distribution lines are adjacent to the premises to be served. Not applicable for lighting public roadways which are dedicated, or anticipated to be dedicated, except to meet the occasional singular need of a customer who has obtained written approval from the proper governmental authority.

449

Data:E1893b3c-247a-4e20-b22b-af34a3146b3f | Open Energy Information  

Open Energy Info (EERE)

b3c-247a-4e20-b22b-af34a3146b3f b3c-247a-4e20-b22b-af34a3146b3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Black Warrior Elec Member Corp Effective date: 2013/09/01 End date if known: Rate name: City Limits- Residential Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

450

Data:Ccbe5417-d7ff-44c8-ad25-8a73f3c00c3e | Open Energy Information  

Open Energy Info (EERE)

Ccbe5417-d7ff-44c8-ad25-8a73f3c00c3e Ccbe5417-d7ff-44c8-ad25-8a73f3c00c3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 100 watt HPS Ornamental Fixture w/Pole Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments

451

Data:Ecd876f3-f3c7-446e-96cf-c2410789d1dc | Open Energy Information  

Open Energy Info (EERE)

Ecd876f3-f3c7-446e-96cf-c2410789d1dc Ecd876f3-f3c7-446e-96cf-c2410789d1dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Commercial-Single Phase Sector: Residential Description: Less than 50kW Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

452

Data:1607e953-3c4e-412e-910c-9193c6b2d53a | Open Energy Information  

Open Energy Info (EERE)

e953-3c4e-412e-910c-9193c6b2d53a e953-3c4e-412e-910c-9193c6b2d53a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Nonlisted Light - 150 Watts Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

453

Data:D5b141ec-ce49-437a-9a01-1888aca9f3c5 | Open Energy Information  

Open Energy Info (EERE)

1ec-ce49-437a-9a01-1888aca9f3c5 1ec-ce49-437a-9a01-1888aca9f3c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Large Power Service Sector: Industrial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

454

Data:E5787da3-ca96-4c3c-92ac-4c3fcd7736ec | Open Energy Information  

Open Energy Info (EERE)

87da3-ca96-4c3c-92ac-4c3fcd7736ec 87da3-ca96-4c3c-92ac-4c3fcd7736ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2010/01/01 End date if known: Rate name: RATE NO. 10 GATES & TURNOUTS Sector: Industrial Description: Applicability: To all irrigation motors operated for the exclusive use of opening or closing gates or turnouts for the purposes of irrigating farm fields or to fill canals which are ultimately used to irrigate fields. Source or reference: http://www.ed3online.org/view/70 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

455

Data:98bd831e-452f-455d-a84b-67f0c1969e3c | Open Energy Information  

Open Energy Info (EERE)

31e-452f-455d-a84b-67f0c1969e3c 31e-452f-455d-a84b-67f0c1969e3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 400W Metal Halide- Urban, Existing Pole Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

456

Data:0bf1401a-952d-4250-9477-5dcb2f9ec3c3 | Open Energy Information  

Open Energy Info (EERE)

a-952d-4250-9477-5dcb2f9ec3c3 a-952d-4250-9477-5dcb2f9ec3c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/11/01 End date if known: Rate name: SCHEDULE SL-3 STREET AND HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 400W Sector: Lighting Description: APPLICABILITY Applicable to service to street and highway lighting installations where the customer owns the equipment and the District furnishes energy at one or more central points and maintains the equipment in accordance with Special Conditions set forth herein. Monthly Usage: 160kWh

457

Data:8eebc326-2d79-4401-8057-2df924a3c678 | Open Energy Information  

Open Energy Info (EERE)

eebc326-2d79-4401-8057-2df924a3c678 eebc326-2d79-4401-8057-2df924a3c678 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Public Service Corp Effective date: 2012/01/01 End date if known: Rate name: Cg-1 (Three Phase Year Round) Sector: Commercial Description: EFFECTIVE IN Class I and IV rate territory. AVAILABILITY This schedule is available to small commercial and industrial customers where neither of the following have been exceeded for three consecutive months and also exceeded for at least one month in each succeeding rolling 12-month period: 1. Total demand of 100 KW; or 2. Total monthly energy consumption of 12,500 Kwh.

458

Data:18dce39c-ee64-43e7-adc3-3c3b192852bd | Open Energy Information  

Open Energy Info (EERE)

dce39c-ee64-43e7-adc3-3c3b192852bd dce39c-ee64-43e7-adc3-3c3b192852bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: Security Lighting Service- SL (100W HPS Open Bottom / Cobra) Sector: Lighting Description: To individual consumers for dusk to dawn out door lighting service in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation

459

Data:0b547592-050b-43f5-ae63-d0fa3c718694 | Open Energy Information  

Open Energy Info (EERE)

7592-050b-43f5-ae63-d0fa3c718694 7592-050b-43f5-ae63-d0fa3c718694 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Underground HPS Traditional 150 W w/ Aid Sector: Lighting Description: * Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

460

Data:18aade9a-90bf-42e9-b25c-dabbaff3c553 | Open Energy Information  

Open Energy Info (EERE)

aade9a-90bf-42e9-b25c-dabbaff3c553 aade9a-90bf-42e9-b25c-dabbaff3c553 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: End date if known: Rate name: Large Power, Industrial Secondary Service Sector: Industrial Description: * Available to Commercial or industrial service over 25kw. Minimum:Higher of 25kw or 90% of previous June-September demand. All bills are adjusted by applicable taxes. Summer rates cover May- October and Winter cover November- April. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability

Note: This page contains sample records for the topic "optic 3c receiver" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Data:F166bf1e-829c-4e3c-b7bb-2ff59b04a741 | Open Energy Information  

Open Energy Info (EERE)

829c-4e3c-b7bb-2ff59b04a741 829c-4e3c-b7bb-2ff59b04a741 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Stock Water Well Sector: Residential Description: Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments $360 per year / 12 months = $30 per month. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

462

Data:7bcef931-9b44-4d3c-b577-7c743ff40ab5 | Open Energy Information  

Open Energy Info (EERE)

bcef931-9b44-4d3c-b577-7c743ff40ab5 bcef931-9b44-4d3c-b577-7c743ff40ab5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: French Broad Elec Member Corp (Tennessee) Effective date: 2009/04/01 End date if known: Rate name: Commercial Generation Three Phase Sector: Commercial Description: Plus Wholesale Purchase Power Fuel Charge (Or Credit) and Sales Tax where applicable Source or reference: http://www.frenchbroademc.com/rateschedule.cfm Source Parent: Comments The Flat rate Adjustment is the Generation credit($/kwh generated) Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

463

Data:1cf649dd-fa6d-4f2c-bf09-f09aba3c4659 | Open Energy Information  

Open Energy Info (EERE)

dd-fa6d-4f2c-bf09-f09aba3c4659 dd-fa6d-4f2c-bf09-f09aba3c4659 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 1000 watt MH Flood Light (Box) Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

464

Data:749debdb-c71b-4497-9ab0-10e3c1e8ac97 | Open Energy Information  

Open Energy Info (EERE)

debdb-c71b-4497-9ab0-10e3c1e8ac97 debdb-c71b-4497-9ab0-10e3c1e8ac97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Competetive Service Electric Rate CS-1 Sector: Commercial Description: This rate is applicable to all non-residential customers whose highest annual peak demand exceeds 5,000 KW and request a contract to define certain terms of electric service/ Subject to Power Cost Adjustment(PCA). The Demand charge, energy charge, excess reactive demand and minimum monthly charge are per the contract.

465

Data:31eec4ef-1da8-4d5d-b10e-3c94ad677750 | Open Energy Information  

Open Energy Info (EERE)

eec4ef-1da8-4d5d-b10e-3c94ad677750 eec4ef-1da8-4d5d-b10e-3c94ad677750 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: End date if known: Rate name: SEASONAL/FARM Sector: Commercial Description: Source or reference: http://www.tpud.org/servicesAndBilling/rateSchedules.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

466

Data:F4f53fd1-ff3c-470a-ac09-80de1228123a | Open Energy Information  

Open Energy Info (EERE)

fd1-ff3c-470a-ac09-80de1228123a fd1-ff3c-470a-ac09-80de1228123a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Prescott, Arkansas (Utility Company) Effective date: End date if known: Rate name: Rental Lights-Night water-150 HP Sector: Lighting Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

467

Data:3f6b198d-b007-4de4-b219-3c28dba94bdd | Open Energy Information  

Open Energy Info (EERE)

b198d-b007-4de4-b219-3c28dba94bdd b198d-b007-4de4-b219-3c28dba94bdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Poudre Valley R E A, Inc Effective date: 2013/01/01 End date if known: Rate name: IP - Irrigation Sector: Residential Description: These rates are available to consumers for agriculture irrigation services, including wholesale nurseries, three farms, and sod/turf farms. There rates are not available to golf courses, homeowners' associations, or installations where irrigation is incidental to other electrical usage. Rates are subject to the established rules and regulations, tariffs, bylaws and Articles, of Incorporation of the Association.

468

Data:43a29280-0830-430d-9c3c-29c30b5229a5 | Open Energy Information  

Open Energy Info (EERE)

a29280-0830-430d-9c3c-29c30b5229a5 a29280-0830-430d-9c3c-29c30b5229a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 250 watt MV/MH - Cobra Head Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

469

Data:E7b17a34-6435-435b-9177-30b3c3b23ca3 | Open Energy Information  

Open Energy Info (EERE)

-6435-435b-9177-30b3c3b23ca3 -6435-435b-9177-30b3c3b23ca3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: J-3 Customer-owned Street Lighting Service (existing customers only) 700 Watt MV Mercury Vapor Sector: Lighting Description: To governmental agency, lighting district, and water district-owned daily, dusk-to-dawn lighting systems which illuminate streets, alleys, and thoroughfares used primarily for motorized vehicular traffic and which meet EWEB's specifications. Source or reference: http://www.eweb.org/public/documents/policies/electric5.pdf

470

Data:591221f5-a1ca-49b1-a2d3-3c21d15acbf3 | Open Energy Information  

Open Energy Info (EERE)

f5-a1ca-49b1-a2d3-3c21d15acbf3 f5-a1ca-49b1-a2d3-3c21d15acbf3 No revision