Powered by Deep Web Technologies
Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Renewable Energy Pilot Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Pilot Program Renewable Energy Pilot Program Renewable Energy Pilot Program < Back Eligibility Investor-Owned Utility Rural Electric Cooperative Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Heating & Cooling Wind Program Info State Louisiana Program Type Other Policy Provider Louisiana Public Service Commission In June 2010, the Louisiana Public Service Commission (LPSC) unanimously approved a Renewable Energy Pilot Program for the state. The final implementation plan was adopted in November 2010. The goal of the pilot program is to determine whether a renewable portfolio standard is suitable for Louisiana. The pilot program has two major components: the Research

2

Journey to Leadership Certificate Program (Pilot)  

Broader source: Energy.gov [DOE]

The Office of Learning and Workforce Development is pleased to announce a pilot training program for DOE entry-level professionals. The program orientation is scheduled for June 4, 2014.For Entry...

3

Funding Opportunity Announcement: Weatherization Innovation Pilot Program  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization Assistance Program Funding Opportunity Announcement DE-FOA-00000309 dealing with the Weatherization Innovation Pilot Program.

4

2014 call for NERSC's Data Intensive Computing Pilot Program...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC's Data Intensive Computing Pilot Program 2014 call for NERSC's Data Intensive Computing Pilot Program Due December 10 November 18, 2013 by Francesca Verdier (0 Comments)...

5

ENERGY STAR Appliance Verification Testing - Pilot Program Summary...  

Broader source: Energy.gov (indexed) [DOE]

Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3,...

6

Waste Isolation Pilot Plant, National Transuranic Program Have...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year in 2013 Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year in 2013 December 24,...

7

HUD PowerSaver Pilot Loan Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HUD PowerSaver Pilot Loan Program HUD PowerSaver Pilot Loan Program Title HUD PowerSaver Pilot Loan Program Publication Type Policy Brief Authors Zimring, Mark, Ian M. Hoffman, and Merrian C. Fuller Tertiary Authors Borgeson, Merrian Secondary Title Clean Energy Program Policy Brief Publisher LBNL Place Published Berkeley Year of Publication 2010 Pagination 6 Date Published 12/2010 Abstract The U.S. Department of Housing and Urban Development (HUD) recently announced the creation of a pilot loan program for home energy improvements. The PowerSaver loan program is a new, energy-focused variant of the Title I Property Improvement Loan Insurance Program (Title I Program) and is planned for introduction in early 2011. The PowerSaver pilot will provide lender insurance for secured and unsecured loans up to $25,000 to single family homeowners. These loans will specifically target residential energy efficiency and renewable energy improvements. HUD estimates the two-year pilot will fund approximately 24,000 loans worth up to $300 million; the program is not capped. The Federal Housing Administration (FHA), HUD"s mortgage insurance unit, will provide up to $25 million in grants as incentives to participating lenders. FHA is seeking lenders in communities with existing programs for promoting residential energy upgrades.

8

Cleveland EnergySaver Pilot Program (From Pilot to Permanent Program)  

Broader source: Energy.gov [DOE]

Provides an overview of the Cleveland EnergySaver Pilot Program aimed at reducing barriers to widespread adoption of residential energy efficient retrofits.

9

Alternative Fuels Data Center: School Bus Pilot Program  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

School Bus Pilot School Bus Pilot Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Pilot Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Pilot Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Pilot Program on Google Bookmark Alternative Fuels Data Center: School Bus Pilot Program on Delicious Rank Alternative Fuels Data Center: School Bus Pilot Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Pilot Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Pilot Program The Vermont Department of Motor Vehicles will approve up to three participants for a pilot program to operate Type II school buses that are

10

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 2 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the second cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

11

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 1 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the first cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

12

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 3 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the third cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

13

Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

School Bus Idle School Bus Idle Reduction Pilot Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Pilot Program As part of the Children's Environmental Health Project, the Arizona

14

Childhood Lead Poisoning Prevention Program Community Awareness Pilot  

E-Print Network [OSTI]

Childhood Lead Poisoning Prevention Program Community Awareness Pilot #12;1 THE GOOD NEWS- Exposure solder, and brass faucets). A

15

New Ideas for Seeding Your Solar Marketplace Program Pilots and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

solar program pilot 45 min.: Brainstorm a novel format for a future solar program that's able to have demonstrable, measurable, and credible impact. Key questions: What...

16

Alternative Fuel and Advanced Technology Vehicles Pilot Program...  

Open Energy Info (EERE)

Program Emissions Benefit Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions Benefit Tool...

17

Smart Metering Pilot Program Inc SMPPI | Open Energy Information  

Open Energy Info (EERE)

Metering Pilot Program Inc SMPPI Metering Pilot Program Inc SMPPI Jump to: navigation, search Name Smart Metering Pilot Program, Inc. (SMPPI) Place Washington, DC Product SMPPI is a non-profit corporation composed of representatives of Pepco, the D.C. Public Service Commission, the D.C. Office of People's Counsel, the D.C. Consumer Utility Board, and the International Brotherhood of Electrical Workers Local 1900. References Smart Metering Pilot Program, Inc. (SMPPI)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Smart Metering Pilot Program, Inc. (SMPPI) is a company located in Washington, DC . References ↑ "Smart Metering Pilot Program, Inc. (SMPPI)" Retrieved from "http://en.openei.org/w/index.php?title=Smart_Metering_Pilot_Program_Inc_SMPPI&oldid=351192"

18

New Ideas for Seeding Your Solar Marketplace Program Pilots and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Seeding Your Solar Marketplace Program Pilots and Embedded Experiments AGENDA May 22, 2014 Hilton Anaheim Anaheim, California 08:30 CONTINENTAL BREAKFAST 09:00 INTRODUCTION...

19

Commercial Building Energy Asset Score: Pilot Findings and Program Update  

Broader source: Energy.gov [DOE]

The webinar was held on April 16, 2014, to share the findings from the 2013 Pilot and provide a program update on the Commercial Building Energy Asset Score.

20

Energy Economic Zone Pilot Program (Florida) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Economic Zone Pilot Program (Florida) Energy Economic Zone Pilot Program (Florida) Energy Economic Zone Pilot Program (Florida) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Program Info State Florida Program Type Enterprise Zone Provider Florida Department of Economic Opportunity In the 2009 Legislative Session, the Florida Legislature established the

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Cathy Zoi on the new Home Energy Score pilot program  

Broader source: Energy.gov [DOE]

The new Home Energy Score pilot program provides consumers with a home energy score between 1 and 10, and shows them how their home compares to others in their region. The program also offers...

22

Murray City Power - Net Metering Pilot Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Murray City Power - Net Metering Pilot Program Murray City Power - Net Metering Pilot Program Murray City Power - Net Metering Pilot Program < Back Eligibility Commercial General Public/Consumer Residential Savings Category Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Utah Program Type Net Metering Provider Murray City Power Under a pilot program, Murray City Power offers net metering to customers that generate electricity using photovoltaic (PV), wind-electric or hydroelectric systems with a maximum capacity of 10 kilowatts (kW).* The utility will install and maintain a revenue meter capable of registering the bi-directional flow of electricity at the customer's facility. Any customer net excess generation (NEG) is carried over to the customer's next bill as a kilowatt-hour credit. Each April, any remaining NEG credits are

23

Commonwealth Woodstove Change-Out Pilot Program (Massachusetts) |  

Broader source: Energy.gov (indexed) [DOE]

Commonwealth Woodstove Change-Out Pilot Program (Massachusetts) Commonwealth Woodstove Change-Out Pilot Program (Massachusetts) Commonwealth Woodstove Change-Out Pilot Program (Massachusetts) < Back Eligibility Low-Income Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Bioenergy Maximum Rebate Residential:$1,000 Low Income Residential:$2,000 Program Info Start Date 12/27/2012 State Massachusetts Program Type State Rebate Program Rebate Amount Residential:$1,000 Low Income Residential:$2,000 '''''NOTE: This program is accepting low income residential voucher applications only from December 27, 2012 until January 17, 2013. After this time period the standard residential voucher applications will become available.''''' The Massachusetts Clean Energy Center (MassCEC) and Massachusetts

24

Pasture, Rangeland and Forage Risk Management Insurance Pilot Program Continues  

E-Print Network [OSTI]

began in specific counties in Colorado, Idaho, Pennsylvania, South Carolina, North Dakota and Texas, has been expanded to include the entire state of Alabama. The vegetation greenness program index piloted in specific counties in Colorado, E-415 10... began in specific counties in Colorado, Idaho, Pennsylvania, South Carolina, North Dakota and Texas, has been expanded to include the entire state of Alabama. The vegetation greenness program index piloted in specific counties in Colorado, E-415 10...

Pena, Jose G.; Bevers, Stan; Thompson, Bill

2007-10-29T23:59:59.000Z

25

Bangladesh-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Bangladesh-Pilot Program for Climate Resilience (PPCR) Bangladesh-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Bangladesh-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Bangladesh UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

26

Zambia-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Zambia-Pilot Program for Climate Resilience (PPCR) Zambia-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Zambia-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Zambia UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

27

Jamaica-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Jamaica-Pilot Program for Climate Resilience (PPCR) Jamaica-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Jamaica-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Jamaica UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

28

Grenada-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Grenada-Pilot Program for Climate Resilience (PPCR) Grenada-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Grenada-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Grenada UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

29

Mozambique-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Mozambique-Pilot Program for Climate Resilience (PPCR) Mozambique-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Mozambique-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Mozambique UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

30

Dominica-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Dominica-Pilot Program for Climate Resilience (PPCR) Dominica-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Dominica-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Dominica UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

31

Tajikistan-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Tajikistan-Pilot Program for Climate Resilience (PPCR) Tajikistan-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Tajikistan-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Tajikistan UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

32

Bolivia-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Bolivia-Pilot Program for Climate Resilience (PPCR) Bolivia-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Bolivia-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Bolivia UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

33

Emergency Management Program Review at the Waste Isolation Pilot Plant  

Broader source: Energy.gov (indexed) [DOE]

Waste Waste Isolation Pilot Plant Emergency Management Program Review at the May 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 6 Hazards Survey and Hazards Assessments .................................. 6 Program Plans, Procedures, and Responder Performance ........ 9 Training, Drills, and Exercises ..................................................... 13 Emergency Public Information and Offsite Response Interfaces ....................................................................................... 15 Feedback and Continuous Improvement Process

34

International Safeguards Technology and Policy Education and Training Pilot Programs  

SciTech Connect (OSTI)

A major focus of the National Nuclear Security Administration-led Next Generation Safeguards Initiative (NGSI) is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. NNSA launched two pilot programs in 2008 to develop university level courses and internships in association with James, Martin Center for Nonproliferation Studies (CNS) at the Monterey Institute of International Studies (MIIS) and Texas A&M University (TAMU). These pilot efforts involved 44 students in total and were closely linked to hands-on internships at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). The Safeguards and Nuclear Material Management pilot program was a collaboration between TAMU, LANL, and LLNL. The LANL-based coursework was shared with the students undertaking internships at LLNL via video teleconferencing. A weeklong hands-on exercise was also conducted at LANL. A second pilot effort, the International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at MIIS in cooperation with LLNL. Speakers from MIIS, LLNL, and other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. The two pilots programs concluded with an NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The value of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of the two programs in the coming years.

Dreicer, M; Anzelon, G A; Essner, J T; Dougan, A D; Doyle, J; Boyer, B; Hypes, P; Sokava, E; Wehling, F; Martin, J; Charlton, W

2009-06-16T23:59:59.000Z

35

Combined Heat and Power Pilot Loan Program (Connecticut) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Loan Program (Connecticut) Loan Program (Connecticut) Combined Heat and Power Pilot Loan Program (Connecticut) < Back Eligibility Commercial Industrial Institutional Savings Category Commercial Heating & Cooling Manufacturing Buying & Making Electricity Maximum Rebate $450 per kilowatt Program Info Funding Source Clean Energy Finance and Investment Authority Start Date 06/18/2012 State Connecticut Program Type State Loan Program Rebate Amount Varies based on the specific technology, efficiency, and economics of the installation Provider Clean Energy Finance and Investment Authority Note: The application deadline was September 28, 2012. This solicitation is now closed. Check the program web site for information regarding the next solicitation. The Clean Energy Finance and Investment Authority (CEFIA) is administering

36

Combined Heat and Power Pilot Grant Program (Connecticut ) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Grant Program (Connecticut ) Grant Program (Connecticut ) Combined Heat and Power Pilot Grant Program (Connecticut ) < Back Eligibility Commercial Industrial Institutional Savings Category Commercial Heating & Cooling Manufacturing Buying & Making Electricity Maximum Rebate $450 per kilowatt Program Info Funding Source Clean Energy Finance and Investment Authority State Connecticut Program Type State Grant Program Rebate Amount Varies based on the specific technology, efficiency, and economics of the installation Provider Clean Energy Finance and Investment Authority Note: The initial application deadline was September 28, 2012. This solicitation is now closed. Check the program web site for information regarding the next solicitation. The Clean Energy Finance and Investment Authority (CEFIA) is administering

37

Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions  

Open Energy Info (EERE)

Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions Benefit Tool Jump to: navigation, search LEDSGP green logo.png FIND MORE DIA TOOLS This tool is part of the Development Impacts Assessment (DIA) Toolkit from the LEDS Global Partnership. Tool Summary LAUNCH TOOL Name: Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions Benefit Tool Agency/Company /Organization: Argonne National Laboratory Sector: Energy Focus Area: Transportation Phase: Determine Baseline, Evaluate Options Topics: Co-benefits assessment, GHG inventory Resource Type: Online calculator, Software/modeling tools User Interface: Spreadsheet Complexity/Ease of Use: Moderate Website: www.transportation.anl.gov/modeling_simulation/AirCred/index.html

38

Cathy Zoi on the New Home Energy Score Pilot Program (Text Version...  

Broader source: Energy.gov (indexed) [DOE]

the New Home Energy Score Pilot Program (Text Version) Below is the text version of the video, Cathy Zoi on the New Home Energy Score Pilot Program, presented on November 19, 2010....

39

Pilot Program for Climate Resilience (PPCR) | Open Energy Information  

Open Energy Info (EERE)

Resilience (PPCR) Resilience (PPCR) Jump to: navigation, search Name Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Bangladesh, Bolivia, Cambodia, Dominica, Grenada, Haiti, Jamaica, Mozambique, Nepal, Niger, Papua New Guinea, Saint Lucia, Saint Vincent and the Grenadines, Samoa, Tajikistan, Tonga, Yemen, Zambia UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea

40

Residential Load Management Program and Pilot  

E-Print Network [OSTI]

In 1986 LCRA embarked on residential load management to control peak summer loads. At that time, LCRA was considered a summer peaking utility, and residential air conditioning and water heating systems were selected for control. The program...

Haverlah, D.; Riordon, K.

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

TVA Partner Utilities - In-Home Energy Evaluation Pilot Program |  

Broader source: Energy.gov (indexed) [DOE]

Kentucky Kentucky Program Type Utility Rebate Program Rebate Amount Windows: $500 Duct Repair, Replacement, and Sealing: $500 Minor Repair Work: $250 Replace HVAC: $250 Insulation: $500 Electric Water Heater and Pipe Insulation: $50 Air Sealing/Weatherstrip/Caulk: $500 Central HVAC Tune-up: $150 Provider Tennessee Valley Authority The Tennessee Valley Authority (TVA) energy right In-Home Energy Evaluation Pilot Program encourages the installation of energy-efficiency improvements in existing single family dwellings. The program offers an in-home energy assessment as well as financing options and rebates/incentives to help homeowners who choose to make investments in significant energy efficiency improvements. Evaluations are performed by TVA-certified energy advisors

42

TVA Partner Utilities - In-Home Energy Evaluation Pilot Program |  

Broader source: Energy.gov (indexed) [DOE]

Alabama Alabama Program Type Utility Rebate Program Rebate Amount Windows: 500 Duct Repair, Replacement, and Sealing: 500 Minor Repair Work: 250 Replace HVAC: 250 Insulation: 500 Electric Water Heater and Pipe Insulation: 50 Air Sealing: 500 Self Installed Insulation, Caulk, Weatherstrip, and Rehabilitation: 250 Central HVAC Tune-up: 150 Provider Tennessee Valley Authority The Tennessee Valley Authority (TVA) energy right In-Home Energy Evaluation Pilot Program encourages the installation of energy-efficiency improvements in existing single family dwellings. The program offers an in-home energy assessment as well as financing options and rebates/incentives to help homeowners who choose to make investments in significant energy efficiency improvements. Evaluations are performed by TVA-certified energy advisors

43

TVA Partner Utilities - In-Home Energy Evaluation Pilot Program |  

Broader source: Energy.gov (indexed) [DOE]

Mississippi Mississippi Program Type Utility Rebate Program Rebate Amount Windows: 500 Duct Repair, Replacement, and Sealing: 500 Minor Repair Work: 250 Replace HVAC: 250 Insulation: 500 Electric Water Heater and Pipe Insulation: 50 Air Sealing: 500 Self Installed Insulation, Caulk, Weatherstrip, and Rehabilitation: 250 Central HVAC Tune-up: 150 Provider Tennessee Valley Authority The Tennessee Valley Authority (TVA) ''energy right'' In-Home Energy Evaluation Pilot Program encourages the installation of energy-efficiency improvements in existing single family dwellings. The program offers an in-home energy assessment as well as financing options and rebates/incentives to help homeowners who choose to make investments in significant energy efficiency improvements. Evaluations are performed by

44

Weatherization Innovation Pilot Program (WIPP): Technical Assistance Summary  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Programs Office (WIPO) launched the Weatherization Innovation Pilot Program (WIPP) to accelerate innovations in whole-house weatherization and advance DOE's goal of increasing the energy efficiency and health and safety of low-income residences without the utilization of additional taxpayer funding. Sixteen WIPP grantees were awarded a total of $30 million in Weatherization Assistance Program (WAP) funds in September 2010. These projects focused on: including nontraditional partners in weatherization service delivery; leveraging significant non-federal funding; and improving the effectiveness of low-income weatherization through the use of new materials, technologies, behavior-change models, and processes.

Hollander, A.

2014-09-01T23:59:59.000Z

45

Leveraging Resources for the Weatherization Innovation Pilot Program (WIPP)- Webinar Transcript  

Broader source: Energy.gov [DOE]

This document contains the transcript for the Leveraging Resources for the Weatherization Innovation Pilot Program (WIPP) webinar held on February 12, 2013.

46

Cathy Zoi on the new Home Energy Score pilot program  

SciTech Connect (OSTI)

Acting Under Secretary Cathy Zoi talks about the new Home Energy Score pilot program that was announced today by Vice President Biden and U.S. Department of Energy Secretary Steven Chu. The Home Energy Score will offer homeowners straightforward, reliable information about their homes' energy efficiency. A report provides consumers with a home energy score between 1 and 10, and shows them how their home compares to others in their region. The report also includes customized, cost-effective recommendations that will help to reduce their energy costs and improve the comfort of their homes.

Zoi, Cathy

2011-01-01T23:59:59.000Z

47

The waste isolation pilot plant regulatory compliance program  

SciTech Connect (OSTI)

The passage of the WIPP Land Withdrawal Act of 1992 (LWA) marked a turning point for the Waste Isolation Pilot Plant (WIPP) program. It established a Congressional mandate to open the WIPP in as short a time as possible, thereby initiating the process of addressing this nation`s transuranic (TRU) waste problem. The DOE responded to the LWA by shifting the priority at the WIPP from scientific investigations to regulatory compliance and the completion of prerequisites for the initiation of operations. Regulatory compliance activities have taken four main focuses: (1) preparing regulatory submittals; (2) aggressive schedules; (3) regulator interface; and (4) public interactions

Mewhinney, J.A. [U.S. Dept. of Energy, Carlsbad, NM (United States); Kehrman, R.F. [Westinghouse Electric Corp., Carlsbad, NM (United States)

1996-06-01T23:59:59.000Z

48

Cathy Zoi on the new Home Energy Score pilot program  

ScienceCinema (OSTI)

Acting Under Secretary Cathy Zoi talks about the new Home Energy Score pilot program that was announced today by Vice President Biden and U.S. Department of Energy Secretary Steven Chu. The Home Energy Score will offer homeowners straightforward, reliable information about their homes' energy efficiency. A report provides consumers with a home energy score between 1 and 10, and shows them how their home compares to others in their region. The report also includes customized, cost-effective recommendations that will help to reduce their energy costs and improve the comfort of their homes.

Zoi, Cathy

2013-05-29T23:59:59.000Z

49

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

50

El Paso Electric Company - Solar PV Pilot Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

El Paso Electric Company - Solar PV Pilot Program El Paso Electric Company - Solar PV Pilot Program El Paso Electric Company - Solar PV Pilot Program < Back Eligibility Commercial Construction Fed. Government Industrial Installer/Contractor Local Government Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Solar Buying & Making Electricity Maximum Rebate Residential: $7,500 Non-Residential: $50,000 Per Customer with Multiple Projects: 25% of 2013 incentive budget Per Service Provider with Multiple Projects: 50% of 2013 incentive budget in each category Program Info Start Date March 2010 State Texas Program Type Utility Rebate Program Rebate Amount Residential: $0.75/W DC Non-Residential: $1.00/W DC Provider El Paso Electric Solar PV Pilot Program '''''El Paso Electric's 2013 Solar PV Rebate program will reopen at 12:00

51

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010  

Broader source: Energy.gov (indexed) [DOE]

FAQ for: ENERGY STAR Verification Testing Pilot Program December 2010 Table of Contents Introduction............................................................................................................................... 1 What product types will be tested? ................................................................................................. 1 Will testing continue after the State Energy Efficient Appliance Rebate Program (SEEARP) ends? .................................................................................................................................................... 1 For Consumers .......................................................................................................................... 1

52

Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year  

Broader source: Energy.gov (indexed) [DOE]

Plant, National Transuranic Program Have Plant, National Transuranic Program Have Banner Year in 2013 Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year in 2013 December 24, 2013 - 12:00pm Addthis Since WIPP became operational in March 1999, it has surpassed receiving 11,000 shipments, which traveled over 14 million safe loaded miles over the nation’s highways through WIPP’s transportation program — equal to about 29 trips around the moon. WIPP has permanently disposed of more than 89,000 cubic meters of TRU waste — enough to fill more than 35 Olympic-size swimming pools. In 2013, WIPP is on course in support of the Los Alamos National Laboratory framework agreement with the State of New Mexico for complete removal of the above ground TRU waste stored at Area G by June 30, 2014. WIPP has cleaned 22 sites of legacy TRU waste.

53

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE has mandated in DOE Order 5400.1 that its operations will be conducted in an environmentally safe manner. The Waste Isolation Pilot Plant (WIPP) will comply with DOE Order 5400.1 and will conduct its operations in a manner that ensures the safety of the environment and the public. This document outlines how the WIPP will protect and preserve groundwater within and surrounding the WIPP facility. Groundwater protection is just one aspect of the WIPP environmental protection effort. The WIPP groundwater surveillance program is designed to determine statistically if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will be determined and appropriate corrective action initiated.

Not Available

1993-12-31T23:59:59.000Z

54

Experimental program plan for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

Not Available

1994-01-01T23:59:59.000Z

55

Saint Vincent and the Grenadines-Pilot Program for Climate Resilience  

Open Energy Info (EERE)

Saint Vincent and the Grenadines-Pilot Program for Climate Resilience Saint Vincent and the Grenadines-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Saint Vincent and the Grenadines-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Saint Vincent and the Grenadines UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan

56

Texas AgriLife Research with General Atomics Pilots Microalgae Ponds in Pecos BIOENERGY PROGRAM  

E-Print Network [OSTI]

Texas AgriLife Research with General Atomics Pilots Microalgae Ponds in Pecos BIOENERGY PROGRAM on the tank bottom will be opened. The Continued on back #12;http://AgBioenergy.tamu.edu concentrated algae

57

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

58

TVA Partner Utilities - In-Home Energy Evaluation Pilot Program (Georgia) |  

Broader source: Energy.gov (indexed) [DOE]

TVA Partner Utilities - In-Home Energy Evaluation Pilot Program TVA Partner Utilities - In-Home Energy Evaluation Pilot Program (Georgia) TVA Partner Utilities - In-Home Energy Evaluation Pilot Program (Georgia) < Back Eligibility Installer/Contractor Residential Utility Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Other Design & Remodeling Windows, Doors, & Skylights Ventilation Manufacturing Heat Pumps Maximum Rebate 50% cost up to $500 Program Info State Georgia Program Type Utility Rebate Program Rebate Amount Windows: $500 Duct Repair, Replacement, and Sealing: $500 Minor Repair Work: $250 Replace HVAC: $250 Insulation: $500 Electric Water Heater and Pipe Insulation: $50 Air Sealing: $500 Caulking, Weatherstripping, and other Self Installed Improvements: $250

59

Texas Propane Fleet Pilot Program | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. tiarravt058kelly2010p.pdf More Documents & Publications Texas Propane Vehicle Pilot Project Texas...

60

Haiti-Pilot Program for Climate Resilience (PPCR) | Open Energy Information  

Open Energy Info (EERE)

Haiti-Pilot Program for Climate Resilience (PPCR) Haiti-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Haiti-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Haiti UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Saint Lucia-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Saint Lucia-Pilot Program for Climate Resilience (PPCR) Saint Lucia-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Saint Lucia-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Saint Lucia UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

62

Yemen-Pilot Program for Climate Resilience (PPCR) | Open Energy Information  

Open Energy Info (EERE)

Yemen-Pilot Program for Climate Resilience (PPCR) Yemen-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Yemen-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Yemen UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

63

Samoa-Pilot Program for Climate Resilience (PPCR) | Open Energy Information  

Open Energy Info (EERE)

Samoa-Pilot Program for Climate Resilience (PPCR) Samoa-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Samoa-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Samoa UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

64

Nepal-Pilot Program for Climate Resilience (PPCR) | Open Energy Information  

Open Energy Info (EERE)

Nepal-Pilot Program for Climate Resilience (PPCR) Nepal-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Nepal-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Nepal UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

65

Niger-Pilot Program for Climate Resilience (PPCR) | Open Energy Information  

Open Energy Info (EERE)

Niger-Pilot Program for Climate Resilience (PPCR) Niger-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Niger-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Niger UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa 2.15 Tajikistan 2.16 Tonga 2.17 Yemen 2.18 Zambia 3 References Overview "The Pilot Program for Climate Resilience (PPCR), approved in November

66

Watch For New PowerSaver Pilot Loan Program in Your Area | Department of  

Broader source: Energy.gov (indexed) [DOE]

Watch For New PowerSaver Pilot Loan Program in Your Area Watch For New PowerSaver Pilot Loan Program in Your Area Watch For New PowerSaver Pilot Loan Program in Your Area May 3, 2011 - 7:30am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy For anybody who has heard about the many benefits of upgrading your home with an energy efficient water heater or furnace-or has wanted to make simple energy-saving home improvements such as insulating their attic, sealing their ducts, and installing better doors and windows-there may be a new financing option coming to a lender near you. As readers of this blog know, putting energy efficient products and installing renewable energy systems in your home can slash your monthly energy bills, but a hurdle that some would-be energy savers run up against

67

Papua New Guinea-Pilot Program for Climate Resilience (PPCR) | Open Energy  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Papua New Guinea-Pilot Program for Climate Resilience (PPCR) Jump to: navigation, search Name Papau New Guinea-Pilot Program for Climate Resilience (PPCR) Agency/Company /Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http://www.climateinvestmentfu Country Papau New Guinea UN Region Southern Asia References Pilot Program for Climate Resilience (PPCR)[1] Contents 1 Overview 2 Programs by Country 2.1 Bangladesh 2.2 Bolivia 2.3 Cambodia 2.4 Dominica 2.5 Grenada 2.6 Haiti 2.7 Jamaica 2.8 Mozambique 2.9 Nepal 2.10 Niger 2.11 Papua New Guinea 2.12 Saint Lucia 2.13 Saint Vincent and the Grenadines 2.14 Samoa

68

Iowa Water and Wastewater Operators Seek SEP Certification in New Pilot Program  

Broader source: Energy.gov [DOE]

The Des Moines Metropolitan Wastewater Reclamation Authority (WRA) and Des Moines Water Works have committed to participate in the Superior Energy Performance (SEP) program as the first members of a new program pilot. SEP recognizes facilities that meet the ISO 50001 global energy management standard and demonstrate improved energy performance.

69

Waste Isolation Pilot Plant Medical Screening Program, Phase I: Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Medical Screening Program Phase I: Needs Assessment Presented to the Office of Worker Screening and Compensation Support, Office of Health, Safety, and Security U.S. Department of Energy Prepared by Queens College, City University of New York United Steelworkers Original Draft: August 22, 2011 Updated Version: May 1, 2012 Table of Contents Summary.............................................................................3 I. Background on the Former Worker Program................................4 II. History of the WIPP Facility......................................................4 III. Scope of this Report.................................................................7 IV. Exposure Characterization........................................................8

70

Indian Point 2 pilot program: NUREG-1465 source term  

SciTech Connect (OSTI)

NUREG-1465, {open_quotes}Accident Source Terms for Light-Water Nuclear Power Plants{close_quotes} provides a postulated fission product source term that is based on current understanding of light water reactor (LWR) accidents and fission product behavior. Reference 1 is applicable to LWR designs and is intended to form the basis for the development of regulatory guidance. Following publication of NUREG-1465 in early 1995, the U.S. Nuclear Regulatory Commission (NRC) approached the nuclear industry for recommendations on the future use of the NUREG for application to existing LWRs. The result was the formation of an industry group through the Nuclear Energy Institute and the selection of several nuclear power plants to serve as pilot plants for the analysis and proposed applications of the NUREG. Con Edison offered Indian Point unit 2 as a pilot plant. Calculations were performed by Westinghouse and submitted to the NRC to utilize the results in support of plant changes. At this time, the NRC review is ongoing.

Jackson, C.W. [Consolidated Edison Co., Buchanan, NY (United States)

1997-12-01T23:59:59.000Z

71

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project was  

E-Print Network [OSTI]

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project grant was developed for the purposes of providing faculty, students and staff the opportunity to work Ways to School," which promotes safe, healthy, sustainable transportation options to local schools. Now

Pulfrey, David L.

72

Tonga-Pilot Program for Climate Resilience (PPCR) | Open Energy...  

Open Energy Info (EERE)

Program for Climate Resilience (PPCR) AgencyCompany Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development...

73

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

faqfinaldecember-2010.pdf More Documents & Publications Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program DOE...

74

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use  

SciTech Connect (OSTI)

A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8" CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

Wiehagen, J.; Del Bianco, M.; Wood, A.

2013-02-01T23:59:59.000Z

75

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

i Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results Mary Ann Piette David Watson Naoya Motegi Sila Kiliccote Lawrence Berkeley National Laboratory MS90R3111 1 Cyclotron Road Berkeley, California 94720 June 19, 2007 LBNL Report Number 62218 ii Acknowledgements The work described in this report was funded by the Emerging Technologies Program at Pacific Gas and Electric Company. Additional funding was provided by the Demand Response Research Center which is funded by the California Energy Commission (Energy Commission), Public Interest Energy Research (PIER) Program, under Work for Others Contract No.500-03-026, Am #1 and by the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. The authors are grateful for the extensive

76

Emissions trading laws and regulations in China's pilot programs: an examination on the regulatory design and its implications for policy making .  

E-Print Network [OSTI]

??This thesis examines the regulatory design of local pilot programs for emissions trading laws and regulations in China. The central investigation is to examine the (more)

ZHANG, HAO

2014-01-01T23:59:59.000Z

77

National Spill Control School. A pilot program in environmental training. Final report  

SciTech Connect (OSTI)

Increased environmental awareness and the amended Federal Water Pollution Control Act of 1972 required an increased level of expertise by the American Public in the field of oil spill prevention and control. The National Spill Control School was created at Corpus Christi State University to help meet this need. Drawing on the talents of a nationwide sample of experts in this field, the project team created a unique management oriented course. A review of the origination and experiences of two years of classes of this pilot program is provided in this report.

Oberholtzer, G.R.; Acuff, J.T.

1980-01-01T23:59:59.000Z

78

The New Hampshire retail competition pilot program and the role of green marketing  

SciTech Connect (OSTI)

Most states in the US are involved in electric industry restructuring, from considering the pros and cons in regulatory dockets to implementing legislative mandates for full restructuring and retail access for all consumers. Several states and utilities have initiated pilot programs in which multiple suppliers or service providers may compete for business and some utility customers can choose among competing suppliers. The State of New Hampshire has been experimenting with a pilot program, mandated by the State Legislature in 1995 and implemented by the New Hampshire Public Utilities Commission (NHPUC), before it implements full retail access. Green marketing, an attempt to characterize the supplier or service provider as environmentally friendly without referring to the energy resource used to generate electricity, was used by several suppliers or service providers to attract customers. This appeal to environmental consumerism was moderately successful, but it raised a number of consumer protection and public policy issues. This issue brief examines the marketing methods used in New Hampshire and explores what green marketing might mean for the development of renewable energy generation. It also addresses the issues raised and their implications.

Holt, E.A. [Ed Holt and Associates, Inc. (United States); Fang, J.M. [National Renewable Energy Lab., Golden, CO (United States)

1997-11-01T23:59:59.000Z

79

ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012  

Broader source: Energy.gov (indexed) [DOE]

- February 3, 2012 ENERGY STAR® is a joint program of the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) with a dual focus on energy and cost savings. These goals are reached through a combination of increasing customer awareness, partnering with over 15,000 private and public sector organizations and driving widespread technological advances in energy efficiency. ENERGY STAR recognizes three paths to increased daily energy efficiency: bringing to market new energy-efficient products, constructing efficient new homes and commercial buildings, and improving the efficiency of existing homes, commercial buildings and industrial facilities. In 2010, DOE launched a pilot program to verify the energy efficiency and water-use characteristics of

80

Weatherization Pilot Projects  

Broader source: Energy.gov [DOE]

Webinars, fact sheets, and other information on Weatherization Assistance Program's Sustainable Energy Resources for Consumers and Weatherization Innovation Pilot Program projects.

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Pilot Quality Control Program for Audit RT External Beams at Mexican Hospitals  

SciTech Connect (OSTI)

A pilot quality control program for audit 18 radiotherapy RT external beams at 13 Mexican hospitals is described--for eleven {sup 60}Co beams and seven photon beams of 6, 10 and 15 MV from accelerators. This program contains five parts: a) Preparation of the TLD-100 powder: washing, drying and annealing (one hour 400 deg. C plus 24 hrs 80 deg. C). b) Sending two IAEA type capsules to the hospitals for irradiation at the hospital to a nominal D{sub W} = 2 Gy{center_dot}c) Preparation at the SSDL of ten calibration curves CC in the range of 0.5 Gy to 6 Gy in terms of absorbed dose to water D{sub W} for {sup 60}Co with traceability to primary laboratory NRC (Canada), according to a window irradiation: 26/10/2007-7/12/2007. d) Reading all capsules that match their hospital time irradiation and the SSDL window irradiation. f) Evaluation of the Dw imparted by the hospitals.

Alvarez R, J T; Tovar M, V M [Secondary Standard Dosimetry Laboratory SSDL, Ionizing Radiation Metrology Department, ININ Carretera Federal Mexico Toluca S/N, La Marquesa, Ocoyoacac, Estado de Mexico 52 750 (Mexico)

2008-08-11T23:59:59.000Z

82

Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant- March 2010  

Broader source: Energy.gov [DOE]

Evaluation to determine whether the Waste Isolation Pilot Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

83

Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant- February 2009  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Waste Isolation Pilot Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

84

Development of a pilot-scale kinetic extruder feeder system and test program. Phase II. Verification testing. Final report  

SciTech Connect (OSTI)

This report describes the work done under Phase II, the verification testing of the Kinetic Extruder. The main objective of the test program was to determine failure modes and wear rates. Only minor auxiliary equipment malfunctions were encountered. Wear rates indicate useful life expectancy of from 1 to 5 years for wear-exposed components. Recommendations are made for adapting the equipment for pilot plant and commercial applications. 3 references, 20 figures, 12 tables.

Not Available

1984-01-12T23:59:59.000Z

85

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect (OSTI)

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

86

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Texas Propane Vehicle Pilot Project Texas Propane Vehicle Pilot Project 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

87

San Diego Hero Alliance: Community-Based Social Marketing Pilot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

San Diego Hero Alliance: Community-Based Social Marketing Pilot Program San Diego Hero Alliance: Community-Based Social Marketing Pilot Program Presents an overview of the...

88

Modeling Tomorrow's Biorefinery - the NREL Biochemical Pilot Plant; Biomass Program (Brochure)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

great ideas into viable solutions great ideas into viable solutions requires the ability to test theories under real world conditions. Few companies have the resources to build pilot-scale processing plants to test their ideas. The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) helps by sharing its world-class equipment and expertise with industry and other research organizations through a variety of contractual arrangements. At the NREL campus in Golden, Colo., researchers use state-of-the-art laboratories to develop and improve the technologies that convert biomass to fuels, chemicals, and materials. One of the most important tools available to biomass researchers is the Biochemical Pilot Plant housed in the Alternative Fuels User Facility (AFUF). In this facility,

89

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

alternative energy educational program, Project SAW: Solar -Solar Energy Research Commission are interested in the program. Projectsolar energy. Award: Pro ect Term: ect Descr 14 months (Project

Case, C.W.

2011-01-01T23:59:59.000Z

90

Stimulating utilities to promote energy efficiency: Process evaluation of Madison Gas and Electric's Competition Pilot Program  

SciTech Connect (OSTI)

This report describes the process evaluation of the design and implementation of the Energy Conservation Competition Pilot (hereafter referred to as the Competition), ordered by the Public Service Commission of Wisconsin (PSCW) with a conceptual framework defined by PSCW staff for the Madison Gas and Electric (MGE) Company. This process evaluation documents the history of the Competition, describing the marketing strategies adopted by MGE and its competitors, customer service and satisfaction, administrative issues, the distribution of installed measures, free riders, and the impact of the Competition on MGE, its competitors, and other Wisconsin utilities. We also suggest recommendations for a future Competition, compare the Competition with other approaches that public utility commissions (PUCs) have used to motivate utilities to promote energy efficiency, and discuss its transferability to other utilities. 48 refs., 8 figs., 40 tabs.

Vine, E.; De Buen, O.; Goldfman, C.

1990-12-01T23:59:59.000Z

91

Referral Tracking Pilot and Referral Outcome Rates for the School Health Program in Panama.  

E-Print Network [OSTI]

??Background: The School Health Program (SHP) in the Republic of Panama includes preventive healthcare services delivery and referral issuing at elementary schools nationwide. Despite these (more)

Candanedo, Jesica Eileen

2013-01-01T23:59:59.000Z

92

Saint Vincent and the Grenadines-Pilot Program for Climate Resilience...  

Open Energy Info (EERE)

Program for Climate Resilience (PPCR) AgencyCompany Organization World Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development...

93

Waste Isolation Pilot Plant Salado hydrology program data report {number_sign}3  

SciTech Connect (OSTI)

WIPP Salado Hydrology Program Data Report {number_sign}3 presents hydrologic data collected during permeability testing, coupled permeability and hydrofracture testing, and gas-threshold-pressure testing of the Salado Formation performed from November 1991 through October 1995. Fluid-pressure monitoring data representing August 1989 through May 1995 are also included. The report presents data from the drilling and testing of three boreholes associated with the permeability testing program, nine boreholes associated with the coupled permeability and hydrofracture testing program, and three boreholes associated with the gas-threshold-pressure testing program. The purpose of the permeability testing program was to provide data with which to interpret the disturbed and undisturbed permeability and pore pressure characteristics of the different Salado Formation lithologies. The purpose of the coupled permeability and hydrofracture testing program was to provide data with which to characterize the occurrence, propagation, and direction of pressure induced fractures in the Salado Formation lithologies, especially MB139. The purpose of the gas-threshold-pressure testing program was to provide data with which to characterize the conditions under which pressurized gas displaces fluid in the brine-saturated Salado Formation lithologies. All of the holes were drilled from the WIPP underground facility 655 m below ground surface in the Salado Formation.

Chace, D.A.; Roberts, R.M.; Palmer, J.B.; Kloska, M.B.; Fort, M.D.; Martin, G.J.; Stensrud, W.A. [INTERA, Inc., Albuquerque, NM (United States)

1998-01-01T23:59:59.000Z

94

Results from Beyond Design Basis Event Pilots | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Results from Beyond Design Basis Event Pilots Results from Beyond Design Basis Event Pilots September 19, 2012 Presenter: Mike Hillman, Program Manager, Office of Health, Safety...

95

Carbon Fiber Pilot Plant and Research Facilities | Department...  

Broader source: Energy.gov (indexed) [DOE]

Pilot Plant and Research Facilities Carbon Fiber Pilot Plant and Research Facilities 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation...

96

Workshop: New Ideas for Seeding Your Solar Marketplace: Program Pilots and Embedded Experiments  

Broader source: Energy.gov [DOE]

Solar installers, utilities, non-profit groups, and policymakers are charged with creating on-the-ground solar programs. A new set of tools, developed by social scientists and strengthened with the...

97

Conceptual plan: Two-Phase Flow Laboratory Program for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The Salado Two-Phase Flow Laboratory Program was established to address concerns regarding two-phase flow properties and to provide WIPP-specific, geologically consistent experimental data to develop more appropriate correlations for Salado rock to replace those currently used in Performance Assessment models. Researchers in Sandia`s Fluid Flow and Transport Department originally identified and emphasized the need for laboratory measurements of Salado threshold pressure and relative permeability. The program expanded to include the measurement of capillary pressure, rock compressibility, porosity, and intrinsic permeability and the assessment of core damage. Sensitivity analyses identified the anhydrite interbed layers as the most likely path for the dissipation of waste-generated gas from waste-storage rooms because of their relatively high permeability. Due to this the program will initially focus on the anhydrite interbed material. The program may expand to include similar rock and flow measurements on other WIPP materials including impure halite, pure halite, and backfill and seal materials. This conceptual plan presents the scope, objectives, and historical documentation of the development of the Salado Two-Phase Flow Program through January 1993. Potential laboratory techniques for assessing core damage and measuring porosity, rock compressibility, capillary and threshold pressure, permeability as a function of stress, and relative permeability are discussed. Details of actual test designs, test procedures, and data analysis are not included in this report, but will be included in the Salado Two-Phase Flow Laboratory Program Test Plan pending the results of experimental and other scoping activities in FY93.

Howarth, S.M.

1993-07-01T23:59:59.000Z

98

Weatherization and Intergovernmental Program: Weatherization Innovation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Innovation Pilot Program to someone by E-mail Innovation Pilot Program to someone by E-mail Share Weatherization and Intergovernmental Program: Weatherization Innovation Pilot Program on Facebook Tweet about Weatherization and Intergovernmental Program: Weatherization Innovation Pilot Program on Twitter Bookmark Weatherization and Intergovernmental Program: Weatherization Innovation Pilot Program on Google Bookmark Weatherization and Intergovernmental Program: Weatherization Innovation Pilot Program on Delicious Rank Weatherization and Intergovernmental Program: Weatherization Innovation Pilot Program on Digg Find More places to share Weatherization and Intergovernmental Program: Weatherization Innovation Pilot Program on AddThis.com... Plans, Implementation, & Results Weatherization Assistance Program

99

Waste Isolation Pilot Plant Salado hydrology program data report No. 2  

SciTech Connect (OSTI)

WIPP Salado Hydrology Program Data Report [number sign]2 presents hydrologic data collected during permeability testing of the Salado Formation performed from August 1989 through July 1992. The report presents the results of the drilling and testing of six boreholes drilled from the WIPP underground facility 655 m below ground surface in the Salado Formation. Permeability tests were conducted using multipacker test tools with inflatable packers to isolate borehole intervals to allow formation pore-pressure buildup and subsequent pressure-pulse and constant-pressure-withdrawal tests. The tests performed in boreholes L4P51, L4P52, SCP01, S1P71, S1P72, an S1P73 involved Marker Beds 138 and 139, anhydrites a,'' b,'' and c,'' clays B, D, E, G, H, J, and K, and several halitic strata. Test data include pressure and temperature from the brine-filled, packer- isolated test intervals, fluid and gas production during constant- pressure-withdrawal tests, and borehole-closure and axial test tool- movement measurements. The boreholes were drilled and/or cored to nominal 10.2-cm diameters using compressed air to remove drill cuttings. Compliance tests were conducted in lengths of steel and stainless-steel casing to evaluate the mechanical performance of the multipacker test tools. Compliance tests included leak tests and pulse-injection and pulse-withdrawal sequences. Following permeability testing, fluid pressures were monitored in packer- isolated sections of test boreholes C2H01, C2H02, SCP01, SlP71, SlP72, DPD01, DPD02, and DPD03.

Stensrud, W.A.; Dale, T.F.; Domski, P.S.; Palmer, J.B.; Roberts, R.M.; Fort, M.D.; Saulnier, G.J. Jr. (INTERA, Inc., Austin, TX (United States)); Jensen, A.L. (Sandia National Labs., Albuquerque, NM (United States))

1992-12-01T23:59:59.000Z

100

Waste Isolation Pilot Plant Salado hydrology program data report No. 2  

SciTech Connect (OSTI)

WIPP Salado Hydrology Program Data Report {number_sign}2 presents hydrologic data collected during permeability testing of the Salado Formation performed from August 1989 through July 1992. The report presents the results of the drilling and testing of six boreholes drilled from the WIPP underground facility 655 m below ground surface in the Salado Formation. Permeability tests were conducted using multipacker test tools with inflatable packers to isolate borehole intervals to allow formation pore-pressure buildup and subsequent pressure-pulse and constant-pressure-withdrawal tests. The tests performed in boreholes L4P51, L4P52, SCP01, S1P71, S1P72, an S1P73 involved Marker Beds 138 and 139, anhydrites ``a,`` ``b,`` and ``c,`` clays B, D, E, G, H, J, and K, and several halitic strata. Test data include pressure and temperature from the brine-filled, packer- isolated test intervals, fluid and gas production during constant- pressure-withdrawal tests, and borehole-closure and axial test tool- movement measurements. The boreholes were drilled and/or cored to nominal 10.2-cm diameters using compressed air to remove drill cuttings. Compliance tests were conducted in lengths of steel and stainless-steel casing to evaluate the mechanical performance of the multipacker test tools. Compliance tests included leak tests and pulse-injection and pulse-withdrawal sequences. Following permeability testing, fluid pressures were monitored in packer- isolated sections of test boreholes C2H01, C2H02, SCP01, SlP71, SlP72, DPD01, DPD02, and DPD03.

Stensrud, W.A.; Dale, T.F.; Domski, P.S.; Palmer, J.B.; Roberts, R.M.; Fort, M.D.; Saulnier, G.J. Jr. [INTERA, Inc., Austin, TX (United States); Jensen, A.L. [Sandia National Labs., Albuquerque, NM (United States)

1992-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Piloting the Smart Grid | Open Energy Information  

Open Energy Info (EERE)

Piloting the Smart Grid Piloting the Smart Grid Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Piloting the Smart Grid Focus Area: Crosscutting Topics: Best Practices Website: www.smartgridnews.com/artman/uploads/1/Piloting_the_smart_grid__05-29- Equivalent URI: cleanenergysolutions.org/content/piloting-smart-grid Language: English Policies: "Deployment Programs,Regulations,Financial Incentives" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Demonstration & Implementation Regulations: Cost Recovery/Allocation This paper provides guidance regarding when and how Smart Grid piloting studies should be conducted along with examples from several recent pilots that involved dynamic pricing, a key element of the smart grid. Smart Grid

102

PRELIMINARY EVALUATION OF PILOT PERFORMANCE-BASED  

E-Print Network [OSTI]

...................................................................................................................................5 History of the Energy Commission's PBI Program and Its DevelopmentCALIFORNIA ENERGY COMMISSION PRELIMINARY EVALUATION OF PILOT PERFORMANCE-BASED INCENTIVE PROGRAM STAFFREPORT SEPTEMBER 2007 CEC-300-2007-011 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION

103

Borehole closure and test zone volume determination program for brine-permeability test results within the Waste Isolation Pilot Plant underground facility  

SciTech Connect (OSTI)

Until recently, hydrologic characterization in closed sections of boreholes at the Waste Isolation Pilot Plant (WIPP) has relied on measurements of pressure and temperature to establish the permeability of the host geological formations. There were no provisions for monitoring tool compliance and salt creep resulting from borehole closure. The new permeability test tool used to characterize the WIPP underground facility has been equipped with a series of sensors to measure the movement of the tool with respect to the borehole and borehole wall movement. A FORTRAN program can interpret the output data from each test and calculate the change in borehole radius, test zone length, and test zone volume. These values provide a correlation of fluid compressibility and tool compliance with the permeability results derived from the test data. 4 figs., 3 tabs.

Jensen, A.L.

1990-05-01T23:59:59.000Z

104

Laboratory creep and mechanical tests on salt data report (1975-1996): Waste Isolation Pilot Plant (WIPP) thermal/structural interactions program  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, New Mexico, is being used by the U.S. Department of Energy to demonstrate the technology for safe handling and disposal of transuranic wastes produced by defense activities in the United States. In support of that demonstration, mechanical tests on salt were conducted in the laboratory to characterize material behavior at the stresses and temperatures expected for a nuclear waste repository. Many of those laboratory test programs have been carried out in the RE/SPEC Inc. rock mechanics laboratory in Rapid City, South Dakota; the first program being authorized in 1975 followed by additional testing programs that continue to the present. All of the WIPP laboratory data generated on salt at RE/SPEC Inc. over the last 20 years is presented in this data report. A variety of test procedures were used in performance of the work including quasi-static triaxial compression tests, constant stress (creep) tests, damage recovery tests, and multiaxial creep tests. The detailed data is presented in individual plots for each specimen tested. Typically, the controlled test conditions applied to each specimen are presented in a plot followed by additional plots of the measured specimen response. Extensive tables are included to summarize the tests that were performed. Both the tables and the plots contain cross-references to the technical reports where the data were originally reported. Also included are general descriptions of laboratory facilities, equipment, and procedures used to perform the work.

Mellegard, K.D. [RE/SPEC Inc., Rapid City, SD (United States); Munson, D.E. [Sandia National Labs., Albuquerque, NM (United States)

1997-02-01T23:59:59.000Z

105

Areas Participating in the Reformulated Gasoline Program  

Gasoline and Diesel Fuel Update (EIA)

Reformulated Gasoline Program Reformulated Gasoline Program Contents * Introduction * Mandated RFG Program Areas o Table 1. Mandated RFG Program Areas * RFG Program Opt-In Areas o Table 2. RFG Program Opt-In Areas * RFG Program Opt-Out Procedures and Areas o Table 3. History of EPA Rulemaking on Opt-Out Procedures o Table 4. RFG Program Opt-Out Areas * State Programs o Table 5. State Reformulated Gasoline Programs * Endnotes Spreadsheets Referenced in this Article * Reformulated Gasoline Control Area Populations Related EIA Short-Term Forecast Analysis Products * Demand and Price Outlook for Phase 2 Reformulated Gasoline, 2000 * Environmental Regulations and Changes in Petroleum Refining Operations * Areas Participating in Oxygenated Gasoline Program

106

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation | Department  

Broader source: Energy.gov (indexed) [DOE]

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation The Brattle Group was retained by Baltimore Gas & Electric Company (BGE) in December 2006 to assist in the design of a dynamic pricing pilot program to develop assessments of the likely impact of a variety of dynamic pricing programs on BGE residential customer load shapes. The residential pilot program, Smart Energy Pricing (SEP) Pilot, was subsequently approved by the Maryland Public Service Commission and successfully implemented in the summer of 2008. This report presents the results from the impact evaluation of the BGE's SEP Pilot in the summer of 2008. BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation More Documents & Publications

107

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation | Department  

Broader source: Energy.gov (indexed) [DOE]

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation The Brattle Group was retained by Baltimore Gas & Electric Company (BGE) in December 2006 to assist in the design of a dynamic pricing pilot program to develop assessments of the likely impact of a variety of dynamic pricing programs on BGE residential customer load shapes. The residential pilot program, Smart Energy Pricing (SEP) Pilot, was subsequently approved by the Maryland Public Service Commission and successfully implemented in the summer of 2008. This report presents the results from the impact evaluation of the BGE's SEP Pilot in the summer of 2008. BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation More Documents & Publications

108

Abstract A25: Reaching diverse populations about cancer clinical trials: Lessons learned from ENACCT's pilot education program  

Science Journals Connector (OSTI)

...Outcomes Quality of Life - Poster Presentations AACR International...Native American Cancer Education for Survivors (NACES...Native American Cancer Education for Survivors (NACES...web-based public health education program presented in...

Margo Michaels; Natasha Blakeney; Abbey Britton; Liz Swords; Naomi Bitow; Brian Gibbs; Samantha Yeun; Bruce Rytkonen; Robert Goodman; Amanda Greene; and Lisbeth Jarama

2010-10-01T23:59:59.000Z

109

Journey to Leadership Certificate Program Application  

Broader source: Energy.gov [DOE]

Application packet for Journey to Leadership Certificate Program Pilot course, includes description.

110

REGIONAL AND COMMUNITY IMPACTS OF THE DEPARTMENT OF ENERGY APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM IN THE WESTERN PACIFIC  

SciTech Connect (OSTI)

The Department of Energy (DOE) distributes small grants for alternative energy projects through their Appropriate Energy Technology (AET) Grants Program. This program extends to the western Pacific, where DOE has given 15 grants for projects in American Samoa the Commonwealth of the Mariana Islands, (CMI), Guam, and the Trust Territory of the Paclfic. Average grant size is $12.5K. Projects in Guam and the CMI include two solar systems for hot water heating, a typhoon-proof greenhouse, and a methane digester in Guam, and three educational projects for solar water heating and distilling, wind water pumping, and methane generating in the CMI. Some of the projects are succesful but others are having difficulties because of particular regional engineering problems (corrosion, typhoons, construction logistics, materials, lack of technicians). Historically, federal grants are not always in harmony with western Pacific cultures, and AET grants should be distributed with a sensitivity toward long range effects.

Case, Charles W.

1980-06-01T23:59:59.000Z

111

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt058tikelly2011p.pdf More Documents & Publications Texas Propane Vehicle Pilot Project Texas...

112

Integrated modeling and experimental programs to predict brine and gas flow at the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

Evaluation of the performance of the WIPP repository involves modeling of brine and gas flow in the host rocks of the Salado Formation, which consist of halite and anhydrite interbeds. Numerous physical, chemical, and structural processes, must be understood to perform this modeling. Gas generation within the repository is strongly coupled to the amount of brine inflow to the repository because brine aids in the corrosion of metals and associated generation of hydrogen gas. Increasing gas pressure in the repository decreases the rate of brine inflow. Ultimately, the gas pressure may exceed the brine pressure and gas may flow out of the repository. Relative-permeability curves and a correlation between threshold pressure and permeability taken from studies reported in the literature were used in PA models prior to being experimentally verified as appropriate for WIPP. In addition, interbed permeabilities were treated as constant and independent of effective stress in early models. Subsequently, the process of interbed fracturing (or fracture dilation) was recognized to limit gas pressures in the repository to values below lithostatic, and assumed (and unverified) relationships between porosity, permeability, and pore pressure were employed. Parameter-sensitivity studies performed using the simplified models identified important parameters for which site-specific data were needed. Unrealistic modeling results, such as room pressures substantially above lithostatic, showed the need to include additional processes in the models. Field and laboratory experimental programs have been initiated in conjunction with continued model development to provide information on important processes and parameters.

Beauheim, R.L.; Howarth, S.M.; Vaughn, P.; Webb, S.W.; Larson, K.W.

1995-01-01T23:59:59.000Z

113

Commercial Building Energy Asset Score 2013 Pilot | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2013 Pilot 2013 Pilot Commercial Building Energy Asset Score 2013 Pilot DOE conducted its first pilot test of the Asset Score in 2012. Findings from that pilot have led to improvements in the overall program and the Asset Scoring Tool. The current program includes the following new features: Enhanced Asset Scoring Tool capabilities, including the ability to score complex buildings and the following building types: multifamily, lodging, libraries, court houses and mixed use. Retail, office, schools, and unrefrigerated warehouses were part of the 2012 Pilot and will continue to be included in the 2013 Pilot. Improved usability, including clearer input definitions, an enhanced user interface, and the ability for multiple users to edit one building Reduced data requirements to generate a simple Asset Score

114

Science Programs for a 2 m-class Telescope at Dome C, Antarctica: PILOT, the Pathfinder for an International Large Optical Telescope  

E-Print Network [OSTI]

The cold, dry and stable air above the summits of the Antarctic plateau provides the best ground-based observing conditions from optical to sub-mm wavelengths to be found on the Earth. PILOT is a proposed 2 m telescope, to be built at Dome C in Antarctica, able to exploit these conditions for conducting astronomy at optical and infrared wavelengths. While PILOT is intended as a pathfinder towards the construction of future grand-design facilities, it will also be able to undertake a range of fundamental science investigations in its own right. This paper provides the performance specifications for PILOT, including its instrumentation. It then describes the kinds of science projects that it could best conduct. These range from planetary science to the search for other solar systems, from star formation within the Galaxy to the star formation history of the Universe, and from gravitational lensing caused by exo-planets to that produced by the cosmic web of dark matter. PILOT would be particularly powerful for wide-field imaging at infrared wavelengths, achieving near-diffraction limited performance with simple tip-tilt wavefront correction. PILOT would also be capable of near-diffraction limited performance in the optical wavebands, as well be able to open new wavebands for regular ground based observation; in the mid-IR from 17 to 40 microns and in the sub-mm at 200 microns.

M. G. Burton; J. Lawrence; M. C. B. Ashley; J. A. Bailey; C. Blake; T. R. Bedding; J. Bland-Hawthorn; I. A. Bond; K. Glazebrook; M. G. Hidas; G. Lewis; S. N. Longmore; S. T. Maddison; S. Mattila; V. Minier; S. D. Ryder; R. Sharp; C. H. Smith; J. W. V. Storey; C. G. Tinney; P. Tuthill; A. J. Walsh; W. Walsh; M. Whiting; T. Wong; D. Woods; P. C. M. Yock

2005-04-29T23:59:59.000Z

115

Williston Northampton Blog News and Events http://willistonblogs.com/blog/2012/11/30/pilot-science-program-tackles-the-big-problems/  

E-Print Network [OSTI]

Williston Northampton Blog News and Events http://willistonblogs.com/blog/2012/11/30/pilot Auerbach asked AP Integrated Science students to solve when he visited The Williston Northampton School the Williston students. He added that instead of opening up a textbook, his students were opening up

Auerbach, Scott M.

116

Home Energy Score Pilot Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Home Energy Score Pilot Summaries Home Energy Score Pilot Summaries Home Energy Score Pilot Summaries The U.S. Department of Energy (DOE) partnered with counties, utilities, and non-profit organizations ("Pilots") across the country to test and evaluate the Home Energy Score from November 2010 through July 2011. Through these Pilots, DOE tested a wide range of issues associated with the program and the associated software, the Home Energy Scoring Tool, including: How homeowners responded to the Home Energy Score and process Training of the home energy assessors and reaction to the Scoring Tool Methods to conduct Quality Assurance Climatic sensitivity of the Home Energy Scoring Tool The Pilots were spread out across varied climates, represented most U.S. regions, and included both urban and rural communities. DOE and the Pilots

117

Waste Isolation Pilot Plant Transportation Security | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Transportation Security Waste Isolation Pilot Plant Transportation Security Waste Isolation Pilot Plant Transportation Security More Documents &...

118

AZ CO2 Storage Pilot  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Storage Pilot Regional Carbon Sequestration Partnerships Initiative Review Meeting Pittsburgh, Pennsylvania October 7, 2008 John Henry Beyer, Ph.D. WESTCARB Program Manager, Geophysicist 510-486-7954, jhbeyer@lbl.gov Lawrence Berkeley National Laboratory Earth Sciences Division, MS 90-1116 Berkeley, CA 94720 2 WESTCARB region has major CO2 point sources 3 WESTCARB region has many deep saline formations - candidates for CO2 storage WESTCARB also created GIS layers for oil/gas fields and deep coal basins Source: DOE Carbon Sequestration Atlas of the United States and Canada 4 - Aspen Environmental - Bevilacqua-Knight, Inc. Arizona Utilities CO2 Storage Pilot Contracting and Funding Flow Department of Energy National Energy Technology Laboratory Lawrence Berkeley National

119

WRI Pilot Test 2012.pub  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Phase 2: Pilot Test Phase 2: Pilot Test Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Research Brief T he U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) has commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is

120

Efficiency Vermont's Enhanced Building Operations Programs  

E-Print Network [OSTI]

1 Efficiency Vermont?s Enhanced Building Operations Programs 11th International Conference for Enhanced Building Operations Session 4: Regional Utility Programs for Operational Improvement New York City - October 19, 2011 2 Topics... for Discussion ? Introduction: Efficiency Vermont ? Efficiency Vermont?s Whole-Building Operational Improvement Programs & Pilot Programs ?Commissioning & Retro-commissioning Programs ?Re-tuning Pilot Program ?Re-tuning Pilot Program Variations ?Other...

Laflamme, S.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Results from Beyond Design Basis Event Pilots | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Results from Beyond Design Basis Event Pilots Results from Beyond Design Basis Event Pilots Results from Beyond Design Basis Event Pilots September 19, 2012 Presenter: Mike Hillman, Program Manager, Office of Health, Safety and Security, US Department of Energy Topics covered: Update DOE safety analysis and emergency management requirements/guidance and perform pilot applications Perform system walkdowns and evaluations at several Cat 1 and 2 DOE nuclear facilities to assess potential susceptibilities to natural phenomena hazards and external BDBEs Conduct emergency drills and exercises at DOE sites with nuclear facilities, focusing on BDBEs Results from Beyond Design Basis Event Pilots More Documents & Publications Development of Guidance for Analysis of Beyond Design Basis Events Report to the Secretary of Energy on Beyond Design Basis Event Pilot

122

Final report of the Department of Energy pilot internship program on radioactive waste at Vanderbilt University (September 1, 1993-08/31, 1994)  

SciTech Connect (OSTI)

This final report summarizes Vanderbilt's ten year program in radioactive waste management. The report describes the interns selected for the program, the interns' course of study, and their assignments.

Frank Parker

1999-08-31T23:59:59.000Z

123

From Hydrogen Fuel Cells to High-Altitude-Pilot Protection Suits...  

Energy Savers [EERE]

From Hydrogen Fuel Cells to High-Altitude-Pilot Protection Suits- Mound Science and Energy Museum Programs Cover a Wide Range of Topics From Hydrogen Fuel Cells to...

124

Independent Oversight Inspection, Waste Isolation Pilot Plant - December  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant - Waste Isolation Pilot Plant - December 2007 Independent Oversight Inspection, Waste Isolation Pilot Plant - December 2007 December 2007 Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Waste Isolation Pilot Plant (WIPP) from July through September 2007. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2007 inspection found that despite isolated areas of program improvement since 2002, WIPP's level of emergency preparedness has largely declined over a period marked by a dramatic increase in the pace of waste receipt and storage activities at the site.

125

Independent Oversight Review, Waste Isolation Pilot Plant - August 2000 |  

Broader source: Energy.gov (indexed) [DOE]

Review, Waste Isolation Pilot Plant - August Review, Waste Isolation Pilot Plant - August 2000 Independent Oversight Review, Waste Isolation Pilot Plant - August 2000 August 2000 Emergency Management Program Review at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a review of the emergency management program at the Waste Isolation Pilot Plant (WIPP) in May 2000. The primary purpose of this review was twofold: to assess selected emergency management system elements that focus on WIPP's readiness to protect site personnel and the public from the consequences of onsite events that may result in the release of hazardous materials; and to evaluate the site's ability to provide appropriate information or

126

Summary of the 2006 Automated Demand Response Pilot  

E-Print Network [OSTI]

This paper discusses the specific concept for, design of, and results from a pilot program to automate demand response with critical peak pricing. California utilities have been exploring the use of critical peak pricing (CPP) to help reduce peak...

Piette, M.; Kiliccote, S.

2007-01-01T23:59:59.000Z

127

Harvard Catalyst Pilot Grants Projects Funded for Year Three  

E-Print Network [OSTI]

Harvard Catalyst Pilot Grants Projects Funded for Year Three Experimental Approach to Genotype the Harvard Catalyst Program we aim to:1) Review, select and culturally adapt evidence-based modules from

Paulsson, Johan

128

FEMP Exterior Solid-State Lighting Technology Pilot  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingcovers the Federal Energy Management Program's (FEMP's) exterior solid-state lighting initiative and technology pilot.

129

A Pilot Plant: The Fastest Path to  

E-Print Network [OSTI]

Key Science Needs for a Technically Sound MFE Pilot Plant Design Integrated Plasma Material Interface Plant Design? (2) Integrated Plasma-Materials Interface · High heat and particle flux and fluence · What seconds in 2028. The MFE Program Needs to Move Faster Implications Building a Component Test Facility

130

Argonne National Laboratory's Recycling Pilot Plant  

ScienceCinema (OSTI)

Argonne has a Recycling Pilot Plant designed to save the non-metal portions of junked cars. Here, program managers demonstrate how plastic shredder residue can be recycled. (Currently these automotive leftovers are sent to landfills.) For more information, visit Argonne's Transportation Technology R&D Center Web site at http://www.transportation.anl.gov.

Spangenberger, Jeff; Jody, Sam;

2013-04-19T23:59:59.000Z

131

Air intake shaft performance tests (Shaft 5): In situ data report (May 1988--July 1995). Waste Isolation Pilot Plant (WIPP) Thermal/Structural Interactions Program  

SciTech Connect (OSTI)

Data are presented from the Air Intake Shaft Test, an in situ test fielded at the Waste Isolation Pilot Plant (WIPP). The construction of this shaft, well after the initial three access shafts, presented an unusual opportunity to obtain valuable detailed data on the mechanical response of a shaft for application to seal design. These data include selected fielding information, test configuration, instrumentation activities, and comprehensive results from a large number of gages. Construction of the test began in December 1987; gage data in this report cover the period from May 1988 through July 1995, with the bulk of the data obtained after obtaining access in November, 1989 and from the heavily instrumented period after remote gage installation between May, 1990, and October, 1991.

Munson, D.E. [Sandia National Labs., Albuquerque, NM (United States). Repository Isolation Systems Dept.; Hoag, D.L.; Ball, J.R. [RE/SPEC Inc., Albuquerque, NM (United States); Baird, G.T.; Jones, R.L. [Tech Reps, Inc., Albuquerque, NM (United States)

1995-07-01T23:59:59.000Z

132

Accelerating Successful Smart Grid Pilots | Open Energy Information  

Open Energy Info (EERE)

Accelerating Successful Smart Grid Pilots Accelerating Successful Smart Grid Pilots Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Accelerating Successful Smart Grid Pilots Focus Area: Renewable Energy Topics: Opportunity Assessment & Screening Website: www3.weforum.org/docs/WEF_EN_SmartGrids_Pilots_Report_2010.pdf Equivalent URI: cleanenergysolutions.org/content/accelerating-successful-smart-grid-pi Language: English Policies: "Deployment Programs,Regulations" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Demonstration & Implementation Regulations: "Enabling Legislation,Resource Integration Planning" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

133

Water Cycle Pilot Study  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Water Cycle Pilot Study To learn more about Earth's water cycle, the U.S. Department of Energy (DOE) has established a multi-laboratory science team representing five DOE...

134

Independent Activity Report, Waste Isolation Pilot Plant - September 2011 |  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant - Waste Isolation Pilot Plant - September 2011 Independent Activity Report, Waste Isolation Pilot Plant - September 2011 September 2011 Orientation Visit to the Waste Isolation Pilot Plant [HIAR-WIPP-2011-09-07] The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE Carlsbad Field Office (CBFO) and the nuclear facility at the Waste Isolation Pilot Plant (WIPP) at Carlsbad, NM, on September 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's activities, and identify specific activities that HSS can perform to carry out its

135

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Inspection, Waste Isolation Pilot Plant, Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 August 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. The results of this review indicate that, overall, CBFO and WTS have

136

Commercial Building Energy Asset Score: 2013 Pilot Overview  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Score: Commercial Building Energy Asset Score: 2013 Pilot Overview June 17, 2013 Joan Glickman, DOE Patty Kappaz, SRA 1 eere.energy.gov Agenda � Team Introduction � Commercial Building Energy Asset Score Update * Program overview * Progress to date * Objectives of the 2013 Pilot * Future plans � Process for Pilot Participation 2 I Energy Asset Score eere.energy.gov � � � � � � � Meet the Team U.S. Department of Energy (DOE) Project oversight Strategic direction Policy perspective Pacific Northwest National Laboratory (PNNL) Technical lead Scoring Tool development and maintenance SRA International (SRA) Pilot management Outreach and communications 3 I Energy Asset Score eere.energy.gov Program Goals * Develop a national energy asset rating to --

137

Inspection of Emergency Management at the Waste Isolation Pilot Plant -  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management at the Waste Isolation Pilot Emergency Management at the Waste Isolation Pilot Plant - Volume II, August 2002 Inspection of Emergency Management at the Waste Isolation Pilot Plant - Volume II, August 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP emergency management program. The results of the review of the WIPP environment, safety, and

138

CMVRTC: WRI Pilot  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WRI PRE-FOt WRI PRE-FOt diagram The purpose of this Pre-FOT is to provide a bridge between the just-completed WRI Commercial Mobile Radio Services (CMRS) Pilot Test (Pilot Test) (31 Jan 11) and the desired large-scale FOT (2014). A bridge is needed because critical portions of the WRI CMRS Pilot Test were not completed or fully tested (e.g. pull-in/by-pass, safety sensor data present in Safety Data Message (SDM), flexible geo-fencing, carrier interface), and the Government Back Office System (GBOS) was not developed in a way to support real, large-scale WRI testing (e.g., interface not relevant to enforcement, system not stable or robust, safety sensor data not understood by developers). This effort, the WRI CMRS Pre-FOT End-to-End System Validation (WRI Pre-FOT), seeks to develop and test a complete end-to-end

139

Waste Isolation Pilot Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Waste Isolation Pilot Plant Waste Isolation Pilot Plant AFFIDAVIT FOR SURVIVING RELATIVE STATE _______________ ) ) ss: __________________ COUNTY OF _____________ ) That I, ________________________, am the _________________________ (Indicate relationship) of ___________________________, who is deceased and make the attached request pursuant to 10 CFR, Section 1008. That the information contained on the attached request is true and correct to the best of my knowledge and belief, and I am signing this authorization subject to the penalties provided in 18 U.S.C. 1001. ____________________________ SIGNATURE NOTARIZATION: SUBSCRIBED and SWORN to before me this ______day of __________, 20_____

140

Waste Isolation Pilot Plant - Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reports Reports Waste Isolation Pilot Plant Review Report 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013 Review Report 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant, November 2012 Activity Reports 2011 Orientation Visit to the Waste Isolation Pilot Plant, September 2011 Review Reports 2007 Independent Oversight Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant, December 2007 Review Reports 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant - Summary Report, August 2002 Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant - Volume I, August 2002

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

APS ALternative Fuel (Hydrogen) Pilot Plant Monitoring System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

502 502 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity APS Alternative Fuel (Hydrogen) Pilot Plant Monitoring System Dimitri Hochard James Francfort July 2005 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-05-00502 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity APS Alternative Fuel (Hydrogen) Pilot Plant Monitoring System Dimitri Hochard a James Francfort b July 2005 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

142

081001 CA CO2 Storage Pilot  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

California California CO2 Storage Pilot Regional Carbon Sequestration Partnerships Initiative Review Meeting Pittsburgh, Pennsylvania October 7, 2008 John Henry Beyer, Ph.D. WESTCARB Program Manager, Geophysicist 510-486-7954, jhbeyer@lbl.gov Lawrence Berkeley National Laboratory Earth Sciences Division, MS 90-1116 Berkeley, CA 94720 2 Industry Partner: Shell Oil Company Committed to reducing global CO2 emissions Extensive technical expertise in: - Geologic evaluation - Well log analysis - Porosity and permeability evaluation - Geophysics - Deep well drilling - CO2 injection A welcome industry partner 3 - Bevilacqua-Knight, Inc. (DOE/PIER) - Lawrence Berkeley National Lab (PIER) - Sandia Technologies, LLC (DOE/PIER) - Terralog (DOE) Northern California CO2 Storage Pilot Contracting and Funding Flow

143

PILOT: design and capabilities  

E-Print Network [OSTI]

The proposed design for PILOT is a general-purpose, wide-field 1 degree 2.4m, f/10 Ritchey-Chretien telescope, with fast tip-tilt guiding, for use 0.5-25 microns. The design allows both wide-field and diffraction-limited use at these wavelengths. The expected overall image quality, including median seeing, is 0.28-0.3" FWHM from 0.8-2.4 microns. Point source sensitivities are estimated.

W. Saunders; P. R. Gillingham; A. J. McGrath; J. W. V. Storey; J. S. Lawrence

2008-01-29T23:59:59.000Z

144

US/Brazil joint pilot project objectives  

SciTech Connect (OSTI)

This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

NONE

1997-12-01T23:59:59.000Z

145

Gasification Research BIOENERGY PROGRAM  

E-Print Network [OSTI]

Gasification Research BIOENERGY PROGRAM Description Researchers inthe@tamu.edu Skid-mounted gasifier: 1.8 tons-per-day pilot unit Gasification of cotton gin trash The new Texas A

146

WIPP - Carlsbad Field Office Tribal Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carlsbad Field Office Tribal Program Shipments to the Waste Isolation Pilot Plant (WIPP) travel through 10 Native American Reservations (among six states) along the transportation...

147

Weatherization Assistance Program | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Office Weatherization Assistance Program Where to Apply for Assistance What is Weatherization Goals & Metrics Pilot Projects Success Stories Guidelines for Home Energy...

148

Federal Technology Deployment Pilot: Exterior Solid State Lighting  

Broader source: Energy.gov (indexed) [DOE]

Federal Technology Deployment Federal Technology Deployment Pilot: Exterior Solid State Lighting Jeff McCullough, LC October 24, 2011 Pacific Northwest National Laboratory Richland, Washington 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov * Overview of DOE's Solid-State Lighting Program * Federal Technology Deployment Pilot: Exterior Solid State Lighting * FEMP Technology Deployment Matrix This Morning's Topics 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Energy Savings Potential of Solid-State Lighting SSL Multi-Year Program Plan, May 2011: http://apps1.eere.energy.gov/buildings/publications/pdfs/ssl/ssl_mypp2011_web.pdf 4 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov A Market in Motion * Tsunami of new products coming to market * Significant learning curve for

149

Waste Isolation Pilot Plant Attracts World Interest | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest June 26, 2013 - 12:00pm Addthis Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall.

150

Waste Isolation Pilot Plant Attracts World Interest | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Isolation Pilot Plant Attracts World Interest Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest June 26, 2013 - 12:00pm Addthis Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. A group of Texas A&M University nuclear engineering students shows enthusiasm for WIPP’s underground operations in May 2013.

151

Weatherization Innovation Pilot Program Projects | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

purchasing, and sale of carbon offsets through the Maine State Housing Authority. The New Hampshire Community Loan Fund, based in Concord, has been selected to receive 600,000...

152

Congestion Management pilot program factsheet - June 2007  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to resolve congestion on its transmission system - reliability redispatch, interim (or bridge) and hourly ATC methodology. The fact sheet also announced that the agency would run a...

153

HUD PowerSaver Pilot Loan Program  

Office of Environmental Management (EM)

is not capped. The Federal Housing Administration (FHA), HUD"s mortgage insurance unit, will provide up to 25 million in grants as incentives to participating lenders. FHA...

154

Microbial field pilot study  

SciTech Connect (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate reducing bacteria will be stimulated to selectively plug flow paths which have been referentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. This report covers progress made during the second year, January 1, 1990 to December 31, 1990, of the Microbial Field Pilot Study project. Information on reservoir ecology, surface facilities design, operation of the unit, core experiments, modeling of microbial processes, and reservoir characterization and simulation are presented in the report. To better understand the ecology of the target reservoir, additional analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. The results of the produced and injected water analysis show increasing sulfide concentrations with respect to time. In March of 1990 Mesa Limited Partnership sold their interest in the SEVVSU to Sullivan and Company. In April, Sullivan and Company assumed operation of the field. The facilities for the field operation of the pilot were refined and implementation was begun. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. The experiments were performed at SEVVSU temperature using fluids and inoculum from the unit. The model described in last year`s report was further validated using results from a core flood experiment. The model was able to simulate the results of one of the core flood experiments with good quality.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1992-03-01T23:59:59.000Z

155

Microbial field pilot study  

SciTech Connect (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate reducing bacteria will be stimulated to selectively plug flow paths which have been referentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. This report covers progress made during the second year, January 1, 1990 to December 31, 1990, of the Microbial Field Pilot Study project. Information on reservoir ecology, surface facilities design, operation of the unit, core experiments, modeling of microbial processes, and reservoir characterization and simulation are presented in the report. To better understand the ecology of the target reservoir, additional analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. The results of the produced and injected water analysis show increasing sulfide concentrations with respect to time. In March of 1990 Mesa Limited Partnership sold their interest in the SEVVSU to Sullivan and Company. In April, Sullivan and Company assumed operation of the field. The facilities for the field operation of the pilot were refined and implementation was begun. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. The experiments were performed at SEVVSU temperature using fluids and inoculum from the unit. The model described in last year's report was further validated using results from a core flood experiment. The model was able to simulate the results of one of the core flood experiments with good quality.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1992-03-01T23:59:59.000Z

156

Microbial Field Pilot Study  

SciTech Connect (OSTI)

This report covers progress made during the first year of the Microbial Field Pilot Study project. Information on reservoir ecology and characterization, facility and treatment design, core experiments, bacterial mobility, and mathematical modeling are addressed. To facilitate an understanding of the ecology of the target reservoir analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. A preliminary design of facilities for the operation of the field pilot test was prepared. In addition, procedures for facilities installation and for injection treatments are described. The Southeast Vassar Vertz Sand Unit (SEVVSU), the site of the proposed field pilot study, is described physically, historically, and geologically. The fields current status is presented and the ongoing reservoir simulation is discussed. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. Two possible mechanisms, relative permeability effects and changes in the capillary number, are discussed and related to four Berea core experiments' results. The experiments were conducted at reservoir temperature using SEVVSU oil, brine, and bacteria. The movement and activity of bacteria in porous media were investigated by monitoring the growth of bacteria in sandpack cores under no flow conditions. The rate of bacteria advancement through the cores was determined. A mathematical model of the MEOR process has been developed. The model is a three phase, seven species, one dimensional model. Finite difference methods are used for solution. Advection terms in balance equations are represented with a third- order upwind differencing scheme to reduce numerical dispersion and oscillations. The model is applied to a batch fermentation example. 52 refs., 26 figs., 21 tabs.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1990-11-01T23:59:59.000Z

157

Oversight Reports - Waste Isolation Pilot Plant | Department...  

Broader source: Energy.gov (indexed) [DOE]

2011 Orientation Visit to the Waste Isolation Pilot Plant HIAR-WIPP-2011-09-07 November 26, 2007 Independent Oversight Inspection, Waste Isolation Pilot Plant - December 2007...

158

Waste Isolation Pilot Plant | Department of Energy  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Operators prepare drums of contact-handled transuranic waste for loading into transportation containers Operators prepare...

159

Waste Isolation Pilot Plant No-migration variance petition. Addendum: Volume 7, Revision 1  

SciTech Connect (OSTI)

This report describes various aspects of the Waste Isolation Pilot Plant (WIPP) including design data, waste characterization, dissolution features, ground water hydrology, natural resources, monitoring, general geology, and the gas generation/test program.

Not Available

1990-03-01T23:59:59.000Z

160

Federal Technology Deployment Pilot: Exterior Solid State Lighting  

Broader source: Energy.gov [DOE]

Presentationgiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingprovides an overview of the U.S. Department of Energy's Solid-State Lighting Program and an exterior solid-state lighting federal technology deployment pilot project.

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Rock mechanics activities at the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The application of rock mechanics at nuclear waste repositories is a true multidisciplinary effort. A description and historical summary of the Waste Isolation Pilot Plant (WIPP) is presented. Rock mechanics programs at the WIPP are outlined, and the current rock mechanics modeling philosophy of the Westinghouse Waste Isolation Division is discussed.

Francke, C. [Westinghouse Electric Corp., Carlsbad, NM (United States); Saeb, S. [International Technology Corp., Albuquerque, NM (United States)

1996-12-31T23:59:59.000Z

162

Programming  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu4.6". The "gnu" indicates that it is providing the GNU...

163

Portland General Electric Co. Pilot Evaluation and  

E-Print Network [OSTI]

capability to support the utility's control of residential customers' central electric space heating systems DIRECT LOAD CONTROL PILOT FOR ELECTRIC SPACE HEAT #12;Direct Load Control Pilot for Electric Space Heat) an evaluation report of its direct load control pilot for electric space heat, called "Direct Load control Pilot

164

Orientation Visit to the Waste Isolation Pilot Plant, September 2011  

Broader source: Energy.gov (indexed) [DOE]

WIPP-2011-09-07 WIPP-2011-09-07 Site: Waste Isolation Pilot Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the Waste Isolation Pilot Plant Dates of Activity : 09/07/2011 Report Preparer: Joseph P. Drago Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE Carlsbad Field Office (CBFO) and the nuclear facility at the Waste Isolation Pilot Plant (WIPP) at Carlsbad, NM, on September 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's

165

Orientation Visit to the Waste Isolation Pilot Plant, September 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP-2011-09-07 WIPP-2011-09-07 Site: Waste Isolation Pilot Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the Waste Isolation Pilot Plant Dates of Activity : 09/07/2011 Report Preparer: Joseph P. Drago Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE Carlsbad Field Office (CBFO) and the nuclear facility at the Waste Isolation Pilot Plant (WIPP) at Carlsbad, NM, on September 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's

166

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

167

Coalbed-methane pilots - timing, design, and analysis  

SciTech Connect (OSTI)

Four distinct sequential phases form a recommended process for coalbed-methane (CBM)-prospect assessment: initial screening reconnaissance, pilot testing, and final appraisal. Stepping through these four phases provides a program of progressively ramping work and cost, while creating a series of discrete decision points at which analysis of results and risks can be assessed. While discussing each of these phases in some degree, this paper focuses on the third, the critically important pilot-testing phase. This paper contains roughly 30 specific recommendations and the fundamental rationale behind each recommendation to help ensure that a CBM pilot will fulfill its primary objectives of (1) demonstrating whether the subject coal reservoir will desorb and produce consequential gas and (2) gathering the data critical to evaluate and risk the prospect at the next-often most critical-decision point.

Roadifer, R.D.; Moore, T.R.

2009-10-15T23:59:59.000Z

168

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2008-03-12T23:59:59.000Z

169

What Is Needed to Make REDD+ Work on the Ground: Lessons Learned from Pilot  

Open Energy Info (EERE)

What Is Needed to Make REDD+ Work on the Ground: Lessons Learned from Pilot What Is Needed to Make REDD+ Work on the Ground: Lessons Learned from Pilot Forest Carbon Initiatives Jump to: navigation, search Tool Summary LAUNCH TOOL Name: What Is Needed to Make REDD+ Work on the Ground: Lessons Learned from Pilot Forest Carbon Initiatives Agency/Company /Organization: Forest Carbon Portal Sector: Land Focus Area: Forestry Topics: Policies/deployment programs Resource Type: Lessons learned/best practices Website: www.forestcarbonportal.com/resource/what-needed-make-redd-work-ground- What Is Needed to Make REDD+ Work on the Ground: Lessons Learned from Pilot Forest Carbon Initiatives Screenshot References: What Is Needed to Make REDD+ Work on the Ground: Lessons Learned from Pilot Forest Carbon Initiatives[1] About "At the United Nations climate negotiations in Copenhagen on December 2009,

170

Waste Isolation Pilot Plant Needs Assessment | Department of...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Needs Assessment Waste Isolation Pilot Plant Needs Assessment May 2012 This Needs Assessment for former Waste Isolation Pilot Plant production workers...

171

Waste Isolation Pilot Plant Activites | Department of Energy  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites More Documents & Publications EIS-0026: 2010 Annual Mitigation...

172

Waste Isolation Pilot Plant Update | Department of Energy  

Office of Environmental Management (EM)

Isolation Pilot Plant Update Waste Isolation Pilot Plant Update Waste Isolation Pilot Plant Update More Documents & Publications TRUPACT-III Quick Facts "TRU" Success: SRS Recovery...

173

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant...

174

MARINE RECREATIONAL INFORMATION PROGRAM PROJECT REPORT  

E-Print Network [OSTI]

validation procedures in the commercial marine license reporting program (MRIP For-Hire Project) by Hongguang1 MARINE RECREATIONAL INFORMATION PROGRAM PROJECT REPORT Hawaii for-hire pilot study to incorporate

175

SRS - Programs - Nonproliferation Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3/2012 3/2012 SEARCH GO spacer SRS Home Nonproliferation Programs In the crucial field of nuclear nonproliferation, SRS employee contributions helped to advance all three of the planned plutonium disposition facilities at the Savannah River Site: the Pit Disassembly and Conversion Facility (PDCF); Waste Solidification Building (WSB); and the Mixed Oxide (MOX) Fuel Fabrication Facility. A $345 million project, the WSB will process liquid waste from the MOX facility. After material is processed at the WSB, transuranic waste will be packaged and sent to the Waste Isolation Pilot Plant in New Mexico, and low-level waste will be packaged and sent to onsite or commercial off-site low-level waste disposal facilities. The mixed oxide fuel fabrication facility will be a major component in the United States' program to dispose of excess weapons grade plutonium.

176

Design considerations for a steam-injection pilot with in-situ foaming  

SciTech Connect (OSTI)

This report reviews the necessary aspects of the planning, operation, evaluation, environmental impact and cost to implement a field pilot of steam injection with in-situ foaming. The Stanford University Petroleum Research Institute (SUPRI) is planning to implement such a pilot in Kern County, California. The cost of the pilot will be shared by the US Department of Energy and an oil company. Some important aspects of drilling and completion programs and their specifications, permits from regulatory bodies, and downhole tools to improve steam stimulation are discussed. The essential surface facilities which include water treatment plant, steam generator, demulsifier and dehydrator are considered. The necessary laboratory research in support of the pilot has been recommended. The formation evaluation and reservoir engineering effort for the pilot has been divided into three phases: reservoir definition, reservoir monitoring and post-pilot study. Appropriate techniques applicable to each phase of the test have been discussed. The environmental impact regulations as related to the steam injection process have been considered. In particular, the environmental problems associated with the burning of crude oil and desulfurization of flue gas have been discussed. Other environmental considerations such as solid and liquid waste disposal, health and safety are also discussed. An estimate of the cost of this field test is presented. Three scenarii (for pilots with high, medium, and low investment potentials, respectively) are presented. Since this report was prepared, a specific site for the supri pilot has been chosen. Appendices G and H present the details on this site.

Siddiqui, M.H.; Sanyal, S.K.; Horn, A.J.

1982-08-01T23:59:59.000Z

177

FEMP Exterior Solid-State Lighting Technology Pilot  

Broader source: Energy.gov (indexed) [DOE]

FUPWG Fall 2012 FUPWG Fall 2012 FEMP Exterior Solid-State Lighting Technology Pilot Jeff McCullough, LC October 17, 2012 Pacific Northwest National Laboratory Richland, Washington 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov * State of SSL Technology - Introducing MOBLI * Federal Energy Management Program (FEMP) - Technology Deployment Matrix - Federal Exterior Market Size - FEMP Exterior SSL Initiative - FEMP-designated Efficiency Requirements - Plans for FY13 * Commercial Building Energy Alliance (CBEA) - About CBEA - Lighting Specifications * High Efficiency Troffers * Parking Structures * Parking Lots - The LEEP Campaign * Introducing MOBLI This Morning's Topics 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Energy Savings Potential of Solid-State Lighting

178

Texas Department of State Health Services - WIPP Program | Department...  

Office of Environmental Management (EM)

State Health Services - WIPP Program More Documents & Publications Waste Isolation Pilot Plant Activites EIS-0026: Annual Mitigation Report EIS-0026: 2010 Annual Mitigation Report...

179

Program Management on Multifamily Retrofits | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

About the Office Weatherization Assistance Program Where to Apply for Assistance What is Weatherization Goals & Metrics Pilot Projects Success Stories Guidelines for Home Energy...

180

Program  

Office of Scientific and Technical Information (OSTI)

Extremophiles 2004 Extremophiles 2004 5th International Conference on Extremophiles SEPTEMBER 19 -23, 2004 CAMBRIDGE, MARYLAND Extremophiles 2004 5th International Conference on Extremophiles © 2004, American Society for Microbiology 1752 N Street, N.W. Washington, DC 20036-2904 Phone: 202-737-3600 World Wide Web: www.asm.org All Rights Reserved Printed in the United States of America ISBN: 1-55581 324-0 TABLE OF CONTENTS General Information Scientific Program Abstracts for Oral Sessions Abstracts for Poster Sessions Index 4 10 18 42 144 4 ASM Conferences EXECUTIVE COMMITTEE Frank Robb, Chair University of Maryland Biotechnology Institute Michael W. Adams University of Georgia Koki Horikoshi Japan Agency for Marine-Earth Science and Technology Robert M. Kelly North Carolina State University Jennifer Littlechild

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOE/WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP-10-2225 WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 Errata U.S. Department of Energy September 2010 2 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 DOE/WIPP-10-2225 3 2009 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2009 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and responses reported during the calendar year, (3) confirm compliance with environmental standards and requirements, and (4) highlight the WIPP Environmental Management System (EMS), significant environmental programs, and accomplishments including progress toward the

182

National Grid Deep Energy Retrofit Pilot  

SciTech Connect (OSTI)

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wider adoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gauge long-term energy performance, durability, and occupant comfort.

Neuhauser, K.

2012-03-01T23:59:59.000Z

183

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not have detrimental effects on the environment. This EMP is to be reviewed annually and updated every three years unless otherwise requested by the DOE or contractor.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-02-19T23:59:59.000Z

184

A cross-cultural mentoring program  

SciTech Connect (OSTI)

This report summarized the results of the pilot Cross-Cultural Mentoring Program at Lawrence Livermore National Laboratory, from the inception of the program idea through its implementation and assessment. It discusses the benefits of mentoring, the origins of the program, program design and implementation, program assessment, and conclusions and recommendations.

Huang-Nissen, S.; Myers, R.Y.

1995-04-01T23:59:59.000Z

185

Better Plants Supply Chain Pilot Overview  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is working with Better Plants Partners to improve energy efficiency throughout their supply chains. Around 40 to 60 percent of a manufacturing companys energy and carbon footprint can reside upstream in its supply chainfrom raw materials, transport, and packaging to the energy consumed in manufacturing processesbut this number can be as high as 80 percent. Coordinating energy management practices between companies and their supply chains has the potential to significantly improve industrial energy productivity and reduce the amount of energy embedded in manufactured products. Through this Supply Chain Pilot, DOE will work with a select group of Better Plants Partners to extend the benefits of energy efficiency to their suppliers. Partners will leverage existing Better Plants Program resources and encourage suppliers to collectively set, track, and meet energy savings goals.

186

Weatherization and Intergovernmental Program: About  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: About to someone by E-mail Share Weatherization and Intergovernmental Program: About on Facebook Tweet about Weatherization and Intergovernmental Program: About on Twitter Bookmark Weatherization and Intergovernmental Program: About on Google Bookmark Weatherization and Intergovernmental Program: About on Delicious Rank Weatherization and Intergovernmental Program: About on Digg Find More places to share Weatherization and Intergovernmental Program: About on AddThis.com... Plans, Implementation, & Results Weatherization Assistance Program WAP - Sustainable Energy Resources for Consumers Grants WAP - Weatherization Innovation Pilot Program State Energy Program

187

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network [OSTI]

water heater (EWH) load control program operated as part of PJM Interconnections Demand ResponseDemand Response Economic and Emergency Load Response Programs Electric Thermal Storage Electric Water Heaterwater pumps and electric thermal storage space heaters. The CSP is also participating in PJMs pilot Demand Response

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

188

Waste Isolation Pilot Plant Safety Analysis Report  

SciTech Connect (OSTI)

The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

NONE

1995-11-01T23:59:59.000Z

189

U.S. Department of Energy Waste Isolation Pilot Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

WIPP Community Relations Plan Web Page Click Here Current Solicitations Current Contracts Carlsbad Field Office The U.S. Department of Energy Carlsbad Field Office has responsibility for the Waste Isolation Pilot Plant and the NationalTransuranic (TRU) Program. The office's mission is to provide safe, compliant, and efficient characterization, transportation, and disposal of defense-related TRU waste. Its vision is to enable a nuclear future for our country by providing safe and environmentally responsible waste management. Overview Overview opening screen The Waste Isolation Pilot Plant, or WIPP, safely disposes of the nation's defense-related transuranic radioactive waste. Located in the Chihuahuan Desert, outside Carlsbad, N.M., WIPP began disposal operations in March 1999.

190

The National Conversion Pilot Project  

SciTech Connect (OSTI)

The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process.

Roberts, A.V. [BNFL, Inc., Golden, CO (United States)

1995-12-31T23:59:59.000Z

191

Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is contaminated with small amounts of plutonium and other TRU radioactive elements. Over the next 35 years, WIPP is expected to receive approximately 175,000 cubic meters of waste from various DOE sites. Enforcement September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006

192

Enforcement Documents - Waste Isolation Pilot Plant | Department...  

Broader source: Energy.gov (indexed) [DOE]

related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant...

193

Waste Isolation Pilot Plant | Department of Energy  

Office of Environmental Management (EM)

Metal Products, Inc - October 28, 2004 More enforcement documents Oversight Reports April 22, 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013...

194

Independent Oversight Inspection, Waste Isolation Pilot Plant...  

Office of Environmental Management (EM)

Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 August 2002 Inspection of Environment, Safety, and...

195

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December 2014 Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows. The Office of Nuclear Safety and...

196

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

197

DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot  

Broader source: Energy.gov (indexed) [DOE]

Proposals for Management of New Mexico Waste Isolation Proposals for Management of New Mexico Waste Isolation Pilot Plant DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant June 20, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico. The successful contractor will manage the WIPP site and DOE's National Transuranic Waste (TRU) program. DOE anticipates awarding a competitive, cost-plus-award-fee contract with an approximate value of $135 million per year, for five years. There will be an option to extend the contract for five additional years. The overall mission of the WIPP and the National TRU program is to protect

198

What customers think of retail access: Results of the Massachusetts Electric Company's pilot  

SciTech Connect (OSTI)

This paper summarizes findings from the evaluation of Massachusetts Electric Company's Residential and Small Commercial Retail Access Pilot Program which was in effect in 1997. Customers in 4 cities within Massachusetts were offered the opportunity to enroll in the Pilot. Participants in the Pilot selected a supplier from a set of options, including low-price generation, green and other options. Most participants in the Pilot are satisfied and most participants and nonparticipants feel choice is important. However, the evaluation identified several significant differences between residential and commercial customers. Commercial customers have a higher level of awareness of retail access and a marked preference for lowest priced supply options. By contrast, price matters less to residential customers. Residential customers who opted not to participate in the pilot have higher level of concern about retail access than the participants, suggesting that for residential customers, experience with the Pilot has been educational. Despite ambitious outreach efforts and educational campaigns, there is a large learning curve which many residential customers have yet to climb. These and other lessons learned about marketing and educating customers on retail access are discussed.

Titus, E.; Fox, E.

1998-07-01T23:59:59.000Z

199

Arsenic pilot plant operation and results:Weatherford, Oklahoma.  

SciTech Connect (OSTI)

Narasimhan Consulting Services, Inc. (NCS), under a contract with the Sandia National Laboratories (SNL), designed and operated pilot scale evaluations of the adsorption and coagulation/filtration treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The pilot evaluation was conducted at Well 30 of the City of Weatherford, OK, which supplies drinking water to a population of more than 10,400. Well water contained arsenic in the range of 16 to 29 ppb during the study. Four commercially available adsorption media were evaluated side by side for a period of three months. Both adsorption and coagulation/filtration effectively reduced arsenic from Well No.30. A preliminary economic analysis indicated that adsorption using an iron oxide media was more cost effective than the coagulation/ filtration technology.

Aragon, Malynda Jo; Arora, H. (Narasimhan Consulting Services Inc., Phoenix, Arizona); Karori, Saqib (Narasimhan Consulting Services Inc., Phoenix, Arizona); Pathan, Sakib (Narasimhan Consulting Services Inc., Phoenix, Arizona)

2007-05-01T23:59:59.000Z

200

Petrel: Data Management and Sharing Pilot | Argonne Leadership...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Cobalt Scheduler GLEAN Petrel Swift Petrel: Data Management and Sharing Pilot The Petrel Data Service pilot provides a mechanism for Argonne researchers and ALCF users to...

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Sandia National Laboratories: Waste Isolation Pilot Plant Accident...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECEnergyComputational Modeling & SimulationWaste Isolation Pilot Plant Accident Investigation Analysis Support Waste Isolation Pilot Plant Accident Investigation Analysis...

202

Federal Technology Deployment Pilot: Exterior Solid State Lighting...  

Energy Savers [EERE]

Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal Utility...

203

Pilot tests guide VOC control choice  

SciTech Connect (OSTI)

On-site pilot testing determines proper operating conditions for catalysts of pollution control equipment at optimum performance levels while demonstrating their ability to reduce emissions, odors and opacity from stack gases in manufacturing processes. Examples are provided ofr the catalytic control of emissions from coffee roasting, carbon fiber manufacturing, and can coating. Portable oxidizer units are employed in the pilot testing.

Van Benschoten, D.M. [Johnson Matthey Environmental Products, Wayne, PA (United States)

1993-10-01T23:59:59.000Z

204

A Pilot Study to Evaluate Development Effort for High Performance Computing  

E-Print Network [OSTI]

1 A Pilot Study to Evaluate Development Effort for High Performance Computing Victor Basili1 the development time for programs written for high performance computers (HPC). To attack this relatively novel students in a graduate level High Performance Computing class at the University of Maryland. We collected

Basili, Victor R.

205

Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report  

SciTech Connect (OSTI)

Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

R. Johansen

2011-09-01T23:59:59.000Z

206

Waste Isolation Pilot Plant. Project progress report for month ending October 31, 1980  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is intended to serve as a nuclear waste repository for those defense transuranic wastes, both remote handled and contact handled, which requires deep geologic disposal, and to provide a separate underground facility for in-situ experiments with various waste forms. Activities in the design, technical support, and scientific program of WIPP are summarized in this report. (DLC)

Not Available

1980-01-01T23:59:59.000Z

207

Waste Isolation Pilot Plant. Project progress report for month ending September 30, 1980  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is intended to serve as a nuclear waste repository for those defense transuranic wastes and to provide a separate underground facility for in-situ experiments. This document summarizes activities in the WIPP design, technical support, and scientific program for this month.

Not Available

1980-01-01T23:59:59.000Z

208

Pilot Demonstration of Phased Retrofits in Florida Homes (Fact Sheet)  

SciTech Connect (OSTI)

The Florida Solar Energy Center (FSEC) and Florida Power and Light are pursuing a collaborative energy research/utility partnership to retrofit a large number of homes using a phased approach. The project is creating detailed data on the energy and economic performance of two levels of home retrofit - simple and deep. Acting as a pilot, this project is expected to provide the information necessary to significantly reduce energy use through much larger community-scale projects in collaboration with utilities, program administrators and other market leader stakeholders.

Not Available

2014-08-01T23:59:59.000Z

209

Hydrologic studies for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The objective of this paper is to provide a general overview of hydrologic conditions at the Waste Isolation Pilot Plant (WIPP) by describing several key hydrologic studies that have been carried out as part of the site characterization program over the last 20 years. The paper is composed of three parts: background information about general objectives of the WIPP project; information about the geologic and hydrologic setting of the facility; and information about three aspects of the hydrologic system that are important to understanding the long-term performance of the WIPP facility. For additional detailed information, the reader is referred to the references cited in the text.

Davies, P.B.

1994-07-01T23:59:59.000Z

210

NRA-00-OES-08 A one-year pilot study for the inclusion of active optical sensors into PALACE  

E-Print Network [OSTI]

NRA-00-OES-08 1 A one-year pilot study for the inclusion of active optical sensors into PALACE, newly-developed solid-state, active optical sensors that measure chlorophyll a fluorescence of ancillary sensors as part of the ARGO program. The ARGO program, if funded at the level of effort proposed

Boss, Emmanuel S.

211

Waste Isolation Pilot Plant borehole data  

SciTech Connect (OSTI)

Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrological testing and resource evaluation exist in numerous source documents. This project was initiated to develop a comprehensive data base that would include the data on all WIPP related surface boreholes from the Atomic Energy Commission, Waste Isolation Pilot Plant Energy Research and Development Administration, Department of Energy, and Hydrologic Test Borehole Programs. The data compiled from each borehole includes: operator, permit number, location, total depth, type of well, driller, drilling record, casing record, plugging schedule, and stratigraphic summary. There are six groups of boreholes contained in this data base, they are as follows: Commercially Drilled Potash Boreholes, Energy Department Wells, Geologic Exploration Boreholes, Hydrologic Test Boreholes, Potash Boreholes, and Subsurface Exploration Boreholes. There were numerous references which contained borehole data. In some cases the data found in one document was inconsistent with data in another document. In order to ensure consistency and accuracy in the data base, the same references were used for as many of the boreholes as possible. For example, all elevations and locations were taken from Compilation and Comparison of Test-Hole Location Surveys in the Vicinity of the WIPP Site. SAND 88-1065, Table 3-5. There are some sections where a data field is left blank. In this case, the information was either not applicable or was unavailable.

NONE

1995-04-01T23:59:59.000Z

212

Weatherization and Intergovernmental Program: Recovery Act  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recovery Act to someone by E-mail Share Weatherization and Intergovernmental Program: Recovery Act on Facebook Tweet about Weatherization and Intergovernmental Program: Recovery Act on Twitter Bookmark Weatherization and Intergovernmental Program: Recovery Act on Google Bookmark Weatherization and Intergovernmental Program: Recovery Act on Delicious Rank Weatherization and Intergovernmental Program: Recovery Act on Digg Find More places to share Weatherization and Intergovernmental Program: Recovery Act on AddThis.com... Plans, Implementation, & Results Weatherization Assistance Program WAP - Sustainable Energy Resources for Consumers Grants WAP - Weatherization Innovation Pilot Program State Energy Program Energy Efficiency & Conservation Block Grant Program

213

Resource Allocation Support System (RASS): Summary report of the 1992 pilot study  

SciTech Connect (OSTI)

The Resource Allocation Support System (RASS) is a decision-aiding system being developed to assist the US Department of Energy`s (DOE`s) Office of Waste Management in program and budget decision making. Four pilot studies were conducted at DOE field offices in summer 1992 to evaluate and improve the RASS design. This report summarizes the combined results of the individual field office pilot studies. Results are presented from different perspectives to illustrate the type of information that would be available from RASS. Lessons learned and directions for future RASS developments are also presented.

Buehring, W.A.; Whitfield, R.G.; Wolsko, T.D.; Kier, P.H.; Absil, M.J.G.; Jusko, M.J.; Sapinski, P.F.

1993-02-01T23:59:59.000Z

214

Waste Isolation Pilot Plant 1999 Site Environmental Report  

SciTech Connect (OSTI)

The U.S. Department of Energy?s (DOE)Carlsbad Area Office and the Westinghouse Waste Isolation Division (WID) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 1999 Site Environmental Report summarizes environmental data from calendar year 1999 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during calendar year 1999. WIPP received its first shipment of waste on March 26, 1999. In 1999, no evidence was found of any adverse effects from WIPP on the surrounding environment. Radionuclide concentrations in the environment surrounding WIPP were not statistically higher in 1999 than in 1998.

Roy B. Evans, Ph.D.; Randall C. Morris, Ph.D.; Timothy D. Reynolds, Ph.D.; Ronald W. Warren; Westinghouse Waste Isolation Division

2000-09-30T23:59:59.000Z

215

Waste Isolation Pilot Plant 2001 Site Environmental Report  

SciTech Connect (OSTI)

The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, Inc.

2002-09-20T23:59:59.000Z

216

Waste Isolation Pilot Plant CY 2000 Site Environmental Report  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

2001-12-31T23:59:59.000Z

217

Designing Industrial DSM Programs that Work  

E-Print Network [OSTI]

.5% $0.021 BPA ConlMod Program 100% 2.5% $0.006 BPA Energy Savings Plan 26% 0.8% $0.007 Puget Power Industrial Conservation Program 5% 2.0% $0.026 UI Energy Blueprint 60% 0.1 % $0.035 ... Number of participating customers divided by number... (POO) Industrial Lighting Incentive Pilot Program. From 1985 through 1988, the Bonneville Power Administration (BPA) funded a lighting efficiency pilot program which served industrial and warehousing facilities in the Clark PUD service territory...

Nadel, S. M.; Jordan, J. A.

218

Monument Valley Phytoremediation Pilot Study:  

Office of Legacy Management (LM)

1.8 1.8 U.S. Department of Energy UMTRA Ground Water Project Monument Valley Ground Water Remediation Work Plan: Native Plant Farming and Phytoremediation Pilot Study August 1998 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Project Number UGW-511-0015-10-000 Document Number U0029501 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0029501 Contents DOE/Grand Junction Office Monument Valley Ground Water Remediation Work Plan August 1998 Page v Contents Page Acronyms .

219

Waste Isolation Pilot Plant Activites  

Broader source: Energy.gov (indexed) [DOE]

DENVER, CO DENVER, CO WASTE ISOLATION PILOT PLANT ACTIVITIES ACTIVITIES O.W. EATON MANAGER, EXTERNAL EMERGENCY MANAGEMENT OPENING OF NEW ROUTES COMPLIANCE WITH PUBLIC LAW 102 579 WIPP LANDWITHDRAWL 102-579 WIPP LANDWITHDRAWL ACT OF 1992 1082 EMERGENCY PERSONNEL TRAINED IN 2010 *MERRTT 1082 EMERGENCY PERSONNEL TRAINED IN 2010 MERRTT *INCIDENT COMMAND SYSTEM *HOSPITAL PREPAREDNESS *HOSPITAL PREPAREDNESS *MEDICAL EXAMINER DISPATCHER (BETA) *DISPATCHER (BETA) RADIOLOGICAL TRAINING RADIOLOGICAL TRAINING FOR FOR FOR FOR HOSPITAL PERSONNEL HOSPITAL PERSONNEL Based on FEMA Course G-346 iNTRODUCTION 4 Hazardous Materials Accidents Part 1 WIPP EXTERNAL EMERGENCY MANAGEMENT EXERCISES CONDUCTED E ercise Location Date Exercise Location Date TRANSAX 90 Colorado Springs, Colorado November 8, 1990 1

220

Better Plants Water Pilot- Overview  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is expanding the Better Buildings Challenge to help partners demonstrate successful approaches to saving water and decrease their utility bills. The commercial and industrial sectors account for more than 25 percent of the withdrawals from public water supplies and many organizations in these sectors may have savings opportunities of 20 to 40%. The efficient use of water resources results in lower operating costs, a more reliable water supply, and improved water quality. Additionally, because energy is required to transport and treat water, saving water also saves energy. Through this pilot, DOE will work with a small, diverse group of Better Buildings Challenge Partners to expand their resource management strategies to include water in addition to energy, set water savings goals, track progress and showcase solutions.

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

GENETIC ALGORITHMS FOR A SINGLE-TRACK VEHICLE AUTONOMOUS PILOT  

E-Print Network [OSTI]

GENETIC ALGORITHMS FOR A SINGLE-TRACK VEHICLE AUTONOMOUS PILOT Dana Vrajitoru Intelligent Systems algorithms to an autonomous pilot designed for motorized single-track vehicles (motorcycles). The pilot contribute efficiently to configuring the autonomous pilot. Key Words Genetic algorithms, multi

Vrajitoru, Dana

222

Waste Isolation Pilot Plant - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Waste Isolation Pilot Plant Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant, September 8, 2006 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC, related to Radiological Uptakes at the Mobile Visual Examination and Repackaging Facility at Lawrence Livermore National Laboratory, December 22, 2005 (EA-2005-08) - Washington TRU Solutions, LLC - Press Release, December 22, 2005 Enforcement Letter issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant, October 28, 2004

223

BSCSP Basalt Pilot Phase II Factsheet 2009  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basalt Sequestration Pilot Test 1 Basalt Sequestration Pilot Test 1 FACTSHEET FOR PARTNERSHIP FIELD VALIDATION TEST Partnership Name Big Sky Regional Carbon Partnership Contacts: DOE/NETL Project Mgr. Name Organization E-Mail William Aljoe NETL William.Aljoe@netl.doe.gov Principal Investigator Lee Spangler Field Test Information: Field Test Name Basalt Sequestration Pilot Test Test Location Near Wallula township in Eastern Washington State Amount and Source of CO 2 Tons Source 1000 Refinery Field Test Partners (Primary Sponsors) Boise White Paper L.L.C., Shell Exploration and Production Company, Port of Walla Walla,

224

Nortel CallPilot A-Style Command Comparison Card  

Broader source: Energy.gov (indexed) [DOE]

Welcome to CallPilot. This card helps you to learn CallPilot by showing you the key differences between Welcome to CallPilot. This card helps you to learn CallPilot by showing you the key differences between CallPilot and your previous messaging system. For example, in CallPilot, you don't need a main menu. When you log in, you are at your first new message right away. To play your messages, compose new messages, or change mailbox settings, you use standard commands that are common to all features. Prompts guide you whenever you pause, and Help is always there when you need it - just press *. For further information, refer to the CallPilot Multimedia Messaging User Guide. Features CallPilot Previous system These keypad diagrams show the frequently used message commands in CallPilot and your previous system. In CallPilot, the following commands are

225

Oversight Reports - Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oversight Reports - Waste Isolation Pilot Plant Oversight Reports - Waste Isolation Pilot Plant Oversight Reports - Waste Isolation Pilot Plant April 22, 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities November 28, 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant September 28, 2011 Independent Activity Report, Waste Isolation Pilot Plant - September 2011 Orientation Visit to the Waste Isolation Pilot Plant [HIAR-WIPP-2011-09-07] October 2, 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Inspection of Environment, Safety, and Health and Emergency Management at

226

Preliminary Hydrogeologic Characterization Results from the Wallula Basalt Pilot Study  

SciTech Connect (OSTI)

The DOE's Big Sky Regional Carbon Sequestration Partnership has completed drilling the first continental flood basalt sequestration pilot borehole to a total depth (TD) of 4,110 feet on the Boise White Paper Mill property at Wallula, Washington. Site suitability was assessed prior to drilling by the 2007-2008 acquisition, processing and analysis of a four-mile, five-line three component seismic swath, which was processed as a single data-dense line. Analysis of the seismic survey data indicated a composite basalt formation thickness of {approx}8,000 feet and absence of major geologic structures (i.e., faults) along the line imaged by the seismic swath. Drilling of Wallula pilot borehole was initiated on January 13, 2009 and reached TD on April 6, 2009. Based on characterization results obtained during drilling, three basalt breccia zones were identified between the depth interval of 2,716 and 2,910 feet, as being suitable injection reservoir for a subsequent CO2 injection pilot study. The targeted injection reservoir lies stratigraphically below the massive Umtanum Member of the Grande Ronde Basalt, whose flow-interior section possesses regionally recognized low-permeability characteristics. The identified composite injection zone reservoir provides a unique and attractive opportunity to scientifically study the reservoir behavior of three inter-connected reservoir intervals below primary and secondary caprock confining zones. Drill cuttings, wireline geophysical logs, and 31one-inch diameter rotary sidewall cores provided geologic data for characterization of rock properties. XRF analyses of selected rock samples provided geochemical characterizations of the rocks and stratigraphic control for the basalt flows encountered by the Wallula pilot borehole. Based on the geochemical results, the pilot borehole was terminated in the Wapshilla Ridge 1 flow of the Grande Ronde Basalt Formation. Detailed hydrologic test characterizations of 12 basalt interflow reservoir zones and 3 flow-interior/caprock intervals were performed during drilling and immediately following reaching the final borehole drilling depth (i.e., 4,110 ft). In addition, six of the 12 basalt interflow zones were selected for detailed hydrochemical characterization. Results from the detailed hydrologic test characterization program provided the primary information on basalt interflow zone transmissivity/injectivity, and caprock permeability characteristics.

B.P. McGrail; E. C. Sullivan; F. A. Spane; D. H. Bacon; G. Hund; P. D. Thorne; C. J. Thompson; S. P. Reidel; F. S. Colwell

2009-12-01T23:59:59.000Z

227

Microsoft Word - Outdoor Small- and Pilot-Scale Research and Development 3768X_final  

Broader source: Energy.gov (indexed) [DOE]

Outdoor, Small- and Pilot-Scale Research and Development (3768X) Outdoor, Small- and Pilot-Scale Research and Development (3768X) Program or Field Office: Office of Science - ORNL Location(s) (City/County/State): Oak Ridge, Tennessee Proposed Action Description: The U.S. Department of Energy Oak Ridge National Laboratory (ORNL) Site Office (DOE-OSO) proposes to conduct outdoor, small- and pilot-scale research and development activities and associated transfer, lease, disposition or acquisition of interests in personal or real property involving advanced materials, biological and ecological systems, energy science, and national security including but not limited to collecting samples and analyzing ecosystem and atmospheric field data; developing, evaluating and testing equipment, materials and components; and

228

Microsoft Word - Indoor Small- and Pilot-Scale Research and Development 3767X_final  

Broader source: Energy.gov (indexed) [DOE]

Indoor, Small- and Pilot-Scale Research and Development (3767X) Indoor, Small- and Pilot-Scale Research and Development (3767X) Program or Field Office: Office of Science - ORNL Location(s) (City/County/State): Oak Ridge, Tennessee Proposed Action Description: The U.S. Department of Energy Oak Ridge National Laboratory (ORNL) Site Office (DOE-OSO) proposes to conduct indoor, small- and pilot-scale research and development activities, laboratory operations, and associated transfer, lease, disposition or acquisition of interests in personal or real property involving advanced computing, advanced materials, biological and ecological systems, energy science, manufacturing, nanotechnology, national security, neutron sciences, chemical sciences, and nuclear physics including but not limited to developing, evaluating and testing: materials and their properties; systems; equipment; instrumentation; renewable energy systems; and

229

Pilot Scale Tests Alden/Concepts NREC Turbine  

SciTech Connect (OSTI)

Alden Research Laboratory, Inc. has completed pilot scale testing of the new Alden/Concepts NREC turbine that was designed to minimize fish injury at hydropower projects. The test program was part of the U.S. Department of Energy's Advanced Hydropower Turbine Systems Program. The prototype turbine operating point was 1,000 cfs at 80ft head and 100 rpm. The turbine was design to: (1) limit peripheral runner speed; (2) have a high minimum pressure; (3) limit pressure change rates; (4) limit the maximum flow shear; (5) minimize the number and total length of leading blade edges; (6) maximize the distance between the runner inlet and the wicket gates and minimize clearances (i.e., gaps) between other components; and (7) maximize the size of flow passages.

Thomas C. Cook; George E.Hecker; Stephen Amaral; Philip Stacy; Fangbiao Lin; Edward Taft

2003-09-30T23:59:59.000Z

230

Final environmental impact statement. Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

Not Available

1980-10-01T23:59:59.000Z

231

Pilot test specific test plan for the removal of arsenic Socorro, New Mexico.  

SciTech Connect (OSTI)

Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative drinking water treatment technologies designed to meet the new arsenic maximum contaminant level (MCL) of 10 {micro}g/L (effective January 2006). As currently envisioned, pilots tests may include multiple phases. Phase I tests will involve side-by-side comparisons of several commercial technologies primarily using design parameters suggested by the Vendors. Subsequent tests (Phase II) may involve repeating some of the original tests, testing the same commercial technologies under different conditions and testing experimental technologies or additional commercial technologies. This Pilot Test Specific Test Plan (PTSTP) was written for Phase I of the Socorro Springs Pilot. The objectives of Phase I include evaluation of the treatment performance of five adsorptive media under ambient pH conditions (approximately 8.0) and assessment of the effect of contact time on the performance of one of the media. Addenda to the PTSTP may be written to cover Phase II studies and supporting laboratory studies. The Phase I demonstration began in the winter of 2004 and will last approximately 9 months. The information from the test will help the City of Socorro choose the best arsenic treatment technology for the Socorro Springs well. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association (AWWA) Research Foundation, SNL, and WERC (A Consortium for Environmental Education and Technology Development).

Collins, Sue S.; Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Aragon, Alicia R.; Dwyer, Brian P.; Marbury, Justin Luke

2006-03-01T23:59:59.000Z

232

ERCOT's Weather Sensitive Demand Response Pilot  

E-Print Network [OSTI]

ERCOTs Weather Sensitive Demand Response Pilot CATEE 12-17-13 ESL-KT-13-12-21 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Disclaimer The information contained in this report has been obtained from... Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Weather Sensitive Loads Pilot CATEE 121313 - Tim Carter 713-646-5476 tim.carter@constellation.com4 Constellation's Integrated Power Products 2013. Constellation Energy Resources, LLC...

Carter, T.

2013-01-01T23:59:59.000Z

233

Committee on the Challenges of Modern Society solar energy pilot study. First follow-up report, October 1979, pilot country: United States; co-pilot countries: Denmark and France. CCMS report No. 110  

SciTech Connect (OSTI)

During 1973 to 1978, over twenty nations participated in the NATO/CCMS Solar Energy Pilot Study, whose objective was to promote and accelerate the use of solar heating and cooling of buildings. The activities in this information exchange included (1) the regular reporting of national solar heating and cooling programs, (2) the development of a format for reporting the performance of solar heating and cooling systems, (3) the exchange of system performance reports, (4) the establishment of two specialized working groups for solar-assisted low energy dwellings and passive solar applications. At the conclusion of the pilot study in 1978, the participants formulated recommendations for continued action at the international level, as well as for action at the national level. This report describes the progress made in implementing those recommendations. In addition to detailing the steps taken to continue collaboration in various efforts initiated within the Solar Energy Pilot Study, the report contains papers on the 1979 status of the solar heating and cooling programs in seventeen CCMS countries.

None

1980-01-01T23:59:59.000Z

234

Energy Efficiency and Conservation Block Grant Program.  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy Categorical Exclusion Determination Form Program or Field Office: Energy Efficiency and Conservation Block Grant Program Project Title NY-City-Syracuse Location: City Syracuse NY American Recovery and Reinvestment Act: Proposed Action or Project Description: 1) Develop energy efficiency and conservation strategy, conduct audits, and perform benchmarking/pilot

235

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

SciTech Connect (OSTI)

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

236

Draft forecast of the final report for the comparison to 40 CFR Part 191, Subpart B, for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The United States Department of Energy is planning to dispose of transuranic wastes, which have been generated by defense programs, at the Waste Isolation Pilot Plant. The WIPP Project will assess compliance with the requirements of the United States Environmental Protection Agency. This report forecasts the planned 1992 document, Comparison to 40 CFR, Part 191, Subpart B, for the Waste Isolation Pilot Plant (WIPP). 130 refs., 36 figs., 11 tabs.

Bertram-Howery, S.G.; Marietta, M.G.; Anderson, D.R.; Gomez, L.S.; Rechard, R.P. (Sandia National Labs., Albuquerque, NM (USA)); Brinster, K.F.; Guzowski, R.V. (Science Applications International Corp., Albuquerque, NM (USA))

1989-12-01T23:59:59.000Z

237

New Ideas for Seeding Your Solar Marketplace Program Pilots and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

data about the peer networks that spread information about innovations and; (2) the capacity to transform the theory's empirical observations into experimentally-validated...

238

Emergency Management Program Review at the Waste Isolation Pilot...  

Broader source: Energy.gov (indexed) [DOE]

safe for operation; and the trips are scheduled, conducted, and tracked to avoid adverse weather and traffic conditions. Should an incident occur, the response by the drivers, the...

239

Cambodia-Pilot Program for Climate Resilience (PPCR) | Open Energy...  

Open Energy Info (EERE)

Bank Sector Energy, Land Topics Background analysis, Finance, Implementation, Low emission development planning, Market analysis Website http:www.climateinvestmentfu Country...

240

Site Programs & Cooperative Agreements: Waste Isolation Pilot Plant  

Broader source: Energy.gov [DOE]

The DOE Carlsbad Field Office funds a number of tribes and pueblos along the WIPP transportation corridors. The funds are for first responder training and support. The following tribes and pueblos...

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989  

SciTech Connect (OSTI)

This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

Not Available

1989-01-01T23:59:59.000Z

242

Carbon Capture Pilots (Kentucky) | Open Energy Information  

Open Energy Info (EERE)

Pilots (Kentucky) Pilots (Kentucky) No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Last modified on February 12, 2013. EZFeed Policy Place Kentucky Name Carbon Capture Pilots (Kentucky) Policy Category Other Policy Policy Type Industry Recruitment/Support Affected Technologies Coal with CCS Active Policy Yes Implementing Sector State/Province Primary Website http://energy.ky.gov/carbon/Pages/default.aspx Summary Support for the Carbon Management Research Group (CMRG), a public/private partnership consisting of most of the Commonwealth's utilities, the Electric Power Research Institute, the Center for Applied Energy Research (CAER), and the Department for Energy Development and Independence (DEDI),

243

Pilot Peak Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Pilot Peak Geothermal Project Pilot Peak Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Pilot Peak Geothermal Project Project Location Information Coordinates 38.342266666667°, -118.10361111111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.342266666667,"lon":-118.10361111111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

244

The Invisible Dutch a Pilot Study Evaluating Dutch  

E-Print Network [OSTI]

The Invisible Dutch a Pilot Study Evaluating Dutch Migrants' Path to New Zealand from 1996 to 2006 in Christchurch, New Zealand and have been working on the research project The Invisible Dutch ­ a Pilot Study

Hickman, Mark

245

Underground Salt Haul Truck Fire at the Waste Isolation Pilot...  

Office of Environmental Management (EM)

Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant February 5, 2014 March 2014 Salt Haul Truck Fire at the Waste Isolation Pilot Plant Salt Haul Truck Fire at the...

246

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Broader source: Energy.gov (indexed) [DOE]

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

247

Home Energy Score Post-Pilot Update Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Home Energy Score Post-Pilot Update, presented in September 2011.

248

Enterprise Assessments Review, Waste Isolation Pilot Plant December 2014  

Broader source: Energy.gov [DOE]

Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows

249

10 MWe Solar Thermal Central Receiver Pilot Plant Heliostat Evaluation  

Science Journals Connector (OSTI)

Sandia is responsible for evaluating the heliostats at the 10 MWe Solar Thermal Central Receiver Pilot Plant in Barstow, California...

C. L. Mavis; J. J. Bartel

1986-01-01T23:59:59.000Z

250

EIS-0026: Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico  

Broader source: Energy.gov [DOE]

The Office of Environmental Restoration and Waste Management prepared this EIS for the Waste Isolation Pilot Plant.

251

Mastering the pilot domestic binary combined-cycle plants  

Science Journals Connector (OSTI)

Results are presented from mastering the pilot binary combined-cycle plants of Type PGU-450T (installed at...

Yu. A. Radin

2006-07-01T23:59:59.000Z

252

Waste Isolation Pilot Plant, Former Construction Worker Screening Projects  

Broader source: Energy.gov (indexed) [DOE]

Construction Worker Screening Construction Worker Screening Projects Waste Isolation Pilot Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

253

WIPP (Waste Isolation Pilot Plant) test phase plan: Performance assessment  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs.

Not Available

1990-04-01T23:59:59.000Z

254

The Waste Isolation Pilot Plant: An International Center of Excellence  

SciTech Connect (OSTI)

The United States Department of Energy's Carlsbad Field Office (CBFO) is responsible for the successful management of transuranic radioactive waste (TRUW) in the United States. TRUW is a long-lived radioactive waste/material (LLRM). CBFO's responsibilities includes the operation of the Waste Isolation Pilot Plant (WIPP), which is a deep geologic repository for the safe disposal of U.S. defense-related TRUW and is located 42 kilometers (km) east of Carlsbad, New Mexico. WIPP is the only deep-geological disposal site for LLRM that is operating in the world today. CBFO also manages the National Transuranic Waste Program (NTP), which oversees TRU waste management from generation to disposal. As of February 2003, approximately 1500 shipments of waste have been safely transported to the WIPP, which has been operating since March 1999.

Matthews, Mark

2003-02-25T23:59:59.000Z

255

Oregon Celebrates Launch of Statewide Clean Energy Works Program |  

Broader source: Energy.gov (indexed) [DOE]

Oregon Celebrates Launch of Statewide Clean Energy Works Program Oregon Celebrates Launch of Statewide Clean Energy Works Program Oregon Celebrates Launch of Statewide Clean Energy Works Program March 21, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Department of Energy Acting Assistant Secretary for Energy Efficiency and Renewable Energy Henry Kelly today issued a statement celebrating the launch of Oregon's Clean Energy Works statewide program, as well as the successful completion of its pilot project in the city of Portland. The pilot project reached its goal of 500 energy efficiency home upgrades and supported over 350 jobs. Due to the enthusiastic response to the pilot program, Clean Energy Works Oregon is expanding the program to 17 communities throughout the state. In the next three years, Clean Energy Works Oregon anticipates enrolling 6,000 Oregon

256

1988 Pilot Institute on Global Change on trace gases and the biosphere  

SciTech Connect (OSTI)

This proposal seeks multi-agency funding to conduct an international, multidisciplinary 1988 Pilot Institute on Global Change to take place from August 7 through 21, 1988, on the topic: Trace Gases and the Biosphere. The institute, to be held in Snowmass, Colorado, is envisioned as a pilot version of a continuing series of institutes on Global Change (IGC). This proposal seeks support for the 1988 pilot institute only. The concept and structure for the continuing series, and the definition of the 1988 pilot institute, were developed at an intensive and multidisciplinary Summer Institute Planning Meeting in Boulder, Colorado, on August 24--25, 1987. The theme for the 1988 PIGC, Trace Gases and the Biosphere, will focus a concerted, high-level multidisciplinary effort on a scientific problem central to the Global Change Program. Dramatic year-to-year increases in the global concentrations of radiatively-active trace gases such as methane and carbon dioxide are now well documented. The predicted climatic effects of these changes lend special urgency to efforts to study the biospheric sources and sinks of these gases and to clarify their interactions and role in the geosphere-biosphere system.

Eddy, J.A.; Moore, B. III

1998-07-01T23:59:59.000Z

257

New Summer Pilot Course 2013 Biodiversity Informatics  

E-Print Network [OSTI]

to advanced under- graduates and graduate students interested in biodiversity, conservation biology, dataNew Summer Pilot Course ­ 2013 Biodiversity Informatics (BIO 494 / BIO 598 ­ 2 Credits) June 17 Franz, David Patterson, Ed Gilbert Contact nico.franz@asu.edu for additional information Biodiversity

Franz, Nico M.

258

46th Street Pilot Street Lighting Project  

E-Print Network [OSTI]

46th Street Pilot Street Lighting Project A Joint Venture: Hennepin County & City of Minneapolis Street to 48th Street) as standard high-pressure sodium (HPS) lighting comparison corridor #12;The over time #12;Initial Lighting Comparison #12;Lighting Project Location #12;Street Light Layout 30

Minnesota, University of

259

Intro to NREL's Thermochemical Pilot Plant  

ScienceCinema (OSTI)

NREL's Thermochemical Pilot Plant converts biomass into higher hydrocarbon fuels and chemicals.NREL is researching biomass pyrolysis. The lab is examining how to upgrade bio-oils via stabilization. Along with this, NREL is developing the engineering system requirements for producing these fuels and chemicals at larger scales.

Magrini, Kim

2014-06-10T23:59:59.000Z

260

Enforcement Documents - Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Enforcement Documents - Waste Isolation Pilot Plant September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant October 28, 2004 Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 Issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant August 30, 2004 Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC,

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Waste Isolation Pilot Plant simulated RH TRU waste experiments: Data and interpretation pilot  

SciTech Connect (OSTI)

The simulated, i.e., nonradioactive remote-handled transuranic waste (RH TRU) experiments being conducted underground in the Waste Isolation Pilot Plant (WIPP) were emplaced in mid-1986 and have been in heated test operation since 9/23/86. These experiments involve the in situ, waste package performance testing of eight full-size, reference RH TRU containers emplaced in horizontal, unlined test holes in the rock salt ribs (walls) of WIPP Room T. All of the test containers have internal electrical heaters; four of the test emplacements were filled with bentonite and silica sand backfill materials. We designed test conditions to be ``near-reference`` with respect to anticipated thermal outputs of RH TRU canisters and their geometrical spacing or layout in WIPP repository rooms, with RH TRU waste reference conditions current as of the start date of this test program. We also conducted some thermal overtest evaluations. This paper provides a: detailed test overview; comprehensive data update for the first 5 years of test operations; summary of experiment observations; initial data interpretations; and, several status; experimental objectives -- how these tests support WIPP TRU waste acceptance, performance assessment studies, underground operations, and the overall WIPP mission; and, in situ performance evaluations of RH TRU waste package materials plus design details and options. We provide instrument data and results for in situ waste container and borehole temperatures, pressures exerted on test containers through the backfill materials, and vertical and horizontal borehole-closure measurements and rates. The effects of heat on borehole closure, fracturing, and near-field materials (metals, backfills, rock salt, and intruding brine) interactions were closely monitored and are summarized, as are assorted test observations. Predictive 3-dimensional thermal and structural modeling studies of borehole and room closures and temperature fields were also performed.

Molecke, M.A.; Argueello, G.J.; Beraun, R.

1993-04-01T23:59:59.000Z

262

Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 3, Chapter C, Appendix C3 (conclusion)--Chapter C, Appendix C9: Revision 3  

SciTech Connect (OSTI)

This volume contains appendices for the following: results of extraction procedure (EP) toxicity data analyses; summary of headspace gas analysis in Rocky Flats Plant sampling program-FY 1988; waste drum gas generation sampling program at Rocky Flats Plant during FY 1988; TRU waste sampling program waste characterization; summary of headspace gas analyses in TRU waste sampling program; summary of volatile organic compounds analyses in TRU waste sampling program; totals analysis versus toxicity characteristic leaching procedure; Waste Isolation Pilot Plant waste characterization sampling and analysis methods; Waste Isolation Pilot Plant waste characterization analytical methods; data reduction, validation and reporting; examples of waste screening checklists; and Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program.

Not Available

1993-03-01T23:59:59.000Z

263

Grandson of Enola Gay pilot gives 70th anniversary lecture  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grandson of Enola Gay pilot gives lecture Grandson of Enola Gay pilot gives lecture Grandson of Enola Gay pilot gives 70th anniversary lecture Col. Paul Tibbets IV, grandson of Enola Gay pilot Paul W. Tibbets Jr., talks about his grandfather and his experiences as a U.S. Air Force pilot flying B-1 and B-2 bombers. April 3, 2013 Col. Paul Tibbets IV, right, sits in the cockpit of "Fifi," a B-29 bomber, with his grandfather and Enola Gay pilot Paul W. Tibbets Jr., in this October 1998 photo taken in Midland, Texas. Col. Paul Tibbets IV, right, sits in the cockpit of "Fifi," a B-29 bomber, with his grandfather and Enola Gay pilot Paul W. Tibbets Jr., in this October 1998 photo taken in Midland, Texas. Contact Steve Sandoval Communications Office (505) 665-9206 Email Paul Tibbets IV is commander of the Air Force Inspection Agency at Kirtland

264

Waste Isolation Pilot Plant Update  

Broader source: Energy.gov (indexed) [DOE]

Update Update J. R. Stroble Director, National TRU Program U.S. Department of Energy Carlsbad Field Office National Transportation Stakeholder Forum May 11, 2011 Denver, Colorado 2 2 Shipments received at WIPP to date: 9,493 Contact-handled: 9,019 Remote-handled: 474 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 44 84 366 947 818 1,002 98 8 997 1,144 730 1,032 Total Shipments by Calendar Year (Including intersite shipments) 1,194 CH TRU waste shipments only CH and RH TRU waste shipments 472 to date Accomplishments -2010 Shipments Shipments Received - (as of May 2, 2011) Site Shipments Loaded Miles Argonne National Laboratory

265

Small Business Demand Response with Communicating Thermostats: SMUD's Summer Solutions Research Pilot  

SciTech Connect (OSTI)

This report documents a field study of 78 small commercial customers in the Sacramento Municipal Utility District service territory who volunteered for an integrated energy-efficiency/demand-response (EE-DR) program in the summer of 2008. The original objective for the pilot was to provide a better understanding of demand response issues in the small commercial sector. Early findings justified a focus on offering small businesses (1) help with the energy efficiency of their buildings in exchange for occasional load shed, and (2) a portfolio of options to meet the needs of a diverse customer sector. To meet these expressed needs, the research pilot provided on-site energy efficiency advice and offered participants several program options, including the choice of either a dynamic rate or monthly payment for air-conditioning setpoint control. An analysis of hourly load data indicates that the offices and retail stores in our sample provided significant demand response, while the restaurants did not. Thermostat data provides further evidence that restaurants attempted to precool and reduce AC service during event hours, but were unable to because their air-conditioning units were undersized. On a 100 F reference day, load impacts of all participants during events averaged 14%, while load impacts of office and retail buildings (excluding restaurants) reached 20%. Overall, pilot participants including restaurants had 2007-2008 summer energy savings of 20% and bill savings of 30%. About 80% of participants said that the program met or surpassed their expectations, and three-quarters said they would probably or definitely participate again without the $120 participation incentive. These results provide evidence that energy efficiency programs, dynamic rates and load control programs can be used concurrently and effectively in the small business sector, and that communicating thermostats are a reliable tool for providing air-conditioning load shed and enhancing the ability of customers on dynamic rates to respond to intermittent price events.

Herter, Karen; Wayland, Seth; Rasin, Josh

2009-09-25T23:59:59.000Z

266

APS Alternative Fuel (Hydrogen) Pilot Plant - Monitoring System Report  

SciTech Connect (OSTI)

The U.S. Department of Energys (DOEs) Advanced Vehicle Testing Activity (AVTA), along with Electric Transportation Applications and Arizona Pubic Service (APS), is monitoring the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant to determine the costs to produce hydrogen fuels (including 100% hydrogen as well as hydrogen and compressed natural gas blends) for use by fleets and other operators of advanced-technology vehicles. The hydrogen fuel cost data will be used as benchmark data by technology modelers as well as research and development programs. The Pilot Plant can produce up to 18 kilograms (kg) of hydrogen per day by electrolysis. It can store up to 155 kg of hydrogen at various pressures up to 6,000 psi. The dispenser island can fuel vehicles with 100% hydrogen at 5,000 psi and with blends of hydrogen and compressed natural gas at 3,600 psi. The monitoring system was designed to track hydrogen delivery to each of the three storage areas and to monitor the use of electricity on all major equipment in the Pilot Plant, including the fuel dispenser island. In addition, water used for the electrolysis process is monitored to allow calculation of the total cost of plant operations and plant efficiencies. The monitoring system at the Pilot Plant will include about 100 sensors when complete (50 are installed to date), allowing for analysis of component, subsystems, and plant-level costs. The monitoring software is mostly off-the-shelve, with a custom interface. The majority of the sensors input to the Programmable Automation Controller as 4- to 20-mA analog signals. The plant can be monitored over of the Internet, but the control functions are restricted to the control room equipment. Using the APS general service plan E32 electric rate of 2.105 cents per kWh, during a recent eight-month period when 1,200 kg of hydrogen was produced and the plant capacity factor was 26%, the electricity cost to produce one kg of hydrogen was $3.43. However, the plant capacity factor has been increasing, with a recent one-month high of 49%. If a plant capacity factor of 70% can be achieved with the present equipment, the cost of electricity would drop to $2.39 per kg of hydrogen. In this report, the power conversion (76.7%), cell stack (53.1%), and reverse osmosis system (7.14%) efficiencies are also calculated, as is the water cost per kg of hydrogen produced ($0.10 per kg). The monitoring system has identified several areas having the potential to lower costs, including using an reverse osmosis system with a higher efficiency, improving the electrolysis power conversion efficiency, and using air cooling to replace some or all chiller cooling. These activities are managed by the Idaho National Laboratory for the AVTA, which is part of DOEs FreedomCAR and Vehicle Technologies Program.

James Francfort; Dimitri Hochard

2005-07-01T23:59:59.000Z

267

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Pilot-Scale Test Results  

SciTech Connect (OSTI)

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, ''Field Testing of a Wet FGD Additive.'' The objective of the project is to demonstrate the use of a flue gas desulfurization (FGD) additive, Degussa Corporation's TMT-15, to prevent the reemissions of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate that the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine TMT salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project will conduct pilot and full-scale tests of the TMT-15 additive in wet FGD absorbers. The tests are intended to determine required additive dosage requirements to prevent Hg{sup 0} reemissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Power River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, TXU Generation Company LP, Southern Company, and Degussa Corporation. TXU Generation has provided the Texas lignite/PRB co-fired test site for pilot FGD tests, Monticello Steam Electric Station Unit 3. Southern Company is providing the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot and full-scale jet bubbling reactor (JBR) FGD systems to be tested. A third utility, to be named later, will provide the high-sulfur Eastern bituminous coal full-scale FGD test site. Degussa Corporation is providing the TMT-15 additive and technical support to the test program. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High Sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. This topical report presents the results from the Task 2 and Task 4 pilot-scale additive tests. The Task 3 and Task 5 full-scale additive tests will be conducted later in calendar year 2006.

Gary M. Blythe

2006-03-01T23:59:59.000Z

268

Waste Isolation Pilot Plant Recovery Plan  

Broader source: Energy.gov [DOE]

This Recovery Plan provides a safe and compliant approach to resuming operations at the Waste Isolation Pilot Plant (WIPP), the repository for disposal of the nations defense transuranic (TRU) waste. The U.S. Department of Energy (DOE) is committed to resuming operations by the first quarter of calendar year 2016, and this Recovery Plan outlines the Departments approach to meet that schedule while prioritizing safety, health, and environmental protection.

269

Waset Isolation Pilot Plant Annual Site Environmental Report for 2006  

SciTech Connect (OSTI)

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2007-09-26T23:59:59.000Z

270

Advanced Gasifier Pilot Plant Concept Definition  

SciTech Connect (OSTI)

This report presents results from definition of a preferred commercial-scale advanced gasifier configuration and concept definition for a gasification pilot plant incorporating those preferred technologies. The preferred commercial gasifier configuration was established based on Cost Of Electricity estimates for an IGCC. Based on the gasifier configuration trade study results, a compact plug flow gasifier, with a dry solids pump, rapid-mix injector, CMC liner insert and partial quench system was selected as the preferred configuration. Preliminary systems analysis results indicate that this configuration could provide cost of product savings for electricity and hydrogen ranging from 15%-20% relative to existing gasifier technologies. This cost of product improvement draws upon the efficiency of the dry feed, rapid mix injector technology, low capital cost compact gasifier, and >99% gasifier availability due to long life injector and gasifier liner, with short replacement time. A pilot plant concept incorporating the technologies associated with the preferred configuration was defined, along with cost and schedule estimates for design, installation, and test operations. It was estimated that a 16,300 kg/day (18 TPD) pilot plant gasifier incorporating the advanced gasification technology and demonstrating 1,000 hours of hot-fire operation could be accomplished over a period of 33 months with a budget of $25.6 M.

Steve Fusselman; Alan Darby; Fred Widman

2005-08-31T23:59:59.000Z

271

Technical basis for external dosimetry at the Waste Isolation Pilot Plant (WIPP)  

SciTech Connect (OSTI)

The WIPP External Dosimetry Program, administered by Westinghouse Electric Corporation, Waste Isolation Division, for the US Department of Energy (DOE), provides external dosimetry support services for operations at the Waste Isolation Pilot Plant (WIPP) Site. These operations include the receipt, experimentation with, storage, and disposal of transuranic (TRU) wastes. This document describes the technical basis for the WIPP External Radiation Dosimetry Program. The purposes of this document are to: (1) provide assurance that the WIPP External Radiation Dosimetry Program is in compliance with all regulatory requirements, (2) provide assurance that the WIPP External Radiation Dosimetry Program is derived from a sound technical base, (3) serve as a technical reference for radiation protection personnel, and (4) aid in identifying and planning for future needs. The external radiation exposure fields are those that are documented in the WIPP Final Safety Analysis Report.

Bradley, E.W. [Science Applications International Corp., Oak Ridge, TN (United States); Wu, C.F.; Goff, T.E. [Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.

1993-12-31T23:59:59.000Z

272

US Virgin Islands EDIN Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Islands EDIN Pilot Project Islands EDIN Pilot Project Jump to: navigation, search Logo: EDIN US Virgin Islands Pilot Project Name EDIN US Virgin Islands Pilot Project Agency/Company /Organization National Renewable Energy Laboratory, United States Department of Energy Partner EDIN Initiative Partners Sector Energy Focus Area Energy Efficiency Topics Low emission development planning, Background analysis Website http://www.edinenergy.org/usvi Country United States Northern America References National Renewable Energy Laboratory, EERE Supported International Activities FY 2009 Annual Operating Plan (August 25, 2009 Abstract The purpose of the EDIN pilot is to have a meaningful impact in a short duration by developing clean energy technologies, policies, and financing mechanisms for the pilot island with projects whose elements can be repeated on other islands.

273

FY 2008 Next Generation Safeguards Initiative International Safeguards Education and Training Pilot Progerams Summary Report  

SciTech Connect (OSTI)

Key component of the Next Generation Safeguards Initiative (NGSI) launched by the National Nuclear Security Administration is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. Two pilot programs at university level, involving 44 students, were initiated and implemented in spring-summer 2008 and linked to hands-on internships at LANL or LLNL. During the internships, students worked on specific safeguards-related projects with a designated Laboratory Mentor to provide broader exposure to nuclear materials management and information analytical techniques. The Safeguards and Nuclear Material Management pilot program was a collaboration between the Texas A&M University (TAMU), Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). It included a 16-lecture course held during a summer internship program. The instructors for the course were from LANL together with TAMU faculty and LLNL experts. The LANL-based course was shared with the students spending their internship at LLNL via video conference. A week-long table-top (or hands-on) exercise on was also conducted at LANL. The student population was a mix of 28 students from a 12 universities participating in a variety of summer internship programs held at LANL and LLNL. A large portion of the students were TAMU students participating in the NGSI pilot. The International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at the Monterey Institute for International Studies (MIIS) in cooperation with LLNL. It included a two-week intensive course consisting of 20 lectures and two exercises. MIIS, LLNL, and speakers from other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. Other university/organizations represented: University of California in LA, Stanford University, and the IAEA. Four of the students that completed this intensive course participated in a 2-month internship at LLNL. The conclusions of the two pilot courses and internships was a NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The Poster sessions were designed to provide a forum for sharing the results of their summer projects and providing experience in presenting their work to a varied audience of students, faculty and laboratory staff. The success of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of their two pilot efforts in the coming years.

Dreicer, M; Anzelon, G; Essner, J; Dougan, A; Doyle, J; Boyer, B; Hypes, P; Sokova, E; Wehling, F

2008-10-17T23:59:59.000Z

274

Summary of Emergency Management Results from Pilot Evaluations | Department  

Broader source: Energy.gov (indexed) [DOE]

Summary of Emergency Management Results from Pilot Evaluations Summary of Emergency Management Results from Pilot Evaluations Summary of Emergency Management Results from Pilot Evaluations September 19th, 2012 Presenter: David Freshwater, Emergency Management Specialist, Office of Emergency Management, National Nuclear Security Administration Topics covered: Confirm that Critical Safety Function scenarios were addressed in HS/EPHA Determine whether site/facility had robust capabilities that allow flexible and effective emergency response to severe events Engage site/facility personnel regarding preferences for requirements/guidance changes where alternate courses of action existed Summary of Emergency Management Results from Pilot Evaluations More Documents & Publications Emergency Management Concepts, Existing Guidance, and Changes

275

On the Piloted Ignition of Solid Fuels in Spacecraft Environments  

E-Print Network [OSTI]

Describing the Steady-State Gasification of Bubble-FormingEffects on the Endothermic Gasification and Piloted Ignitionon Nonflaming Transient Gasification of PMMA and PE During

Fereres-Rapoport, Sonya M.

2011-01-01T23:59:59.000Z

276

Independent Activity Report, Waste Isolation Pilot Plant - September...  

Broader source: Energy.gov (indexed) [DOE]

Diffusion Plant - July 2011 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 Independent Activity Report, West Valley Demonstration Project - November 2011...

277

Impact Evaluation of BGE's SEP 2009 Pilot | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Smart Energy Pricing Pilot Summer 2008 Impact Evaluation Comments of Baltimore Gas & Electric Company FERC Presendation: Demand Response as Power System Resources, October 29, 2010...

278

Commercial Building Energy Asset Score 2013 Pilot | Department...  

Broader source: Energy.gov (indexed) [DOE]

participation. assetscorepilotoverviewwebinar061713.wmv More Documents & Publications Commercial Building Energy Asset Score 2013 Pilot Asset Score API Webinar June 14, 2013...

279

ENVIRONMENTAL ASSESSMENT OCEAN THERMAL ENERGY CONVERSION (OTEC) PILOT PLANTS  

E-Print Network [OSTI]

Commercial ocean thermal energy conversion (OTEC) plants byFifth Ocean Thermal Energy Conversion Conference, February1980. Ocean thermal energy conversion (OTEC) pilot plant

Sullivan, S.M.

2014-01-01T23:59:59.000Z

280

CMI Unique Facility: Pilot-Scale Separations Test Bed Facility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Idaho National Laboratory Noting that the CMI Grand Challenges include separating rare earth elements from each other, the Critical Materials Institute established a pilot-scale...

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Independent Oversight Review, Waste Isolation Pilot Plant - November...  

Energy Savers [EERE]

Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe natural phenomena...

282

Building America Whole-House Solutions for Existing Homes: Pilot...  

Broader source: Energy.gov (indexed) [DOE]

Florida Homes - Central and South Florida (Fact Sheet) In this pilot project, the Florida Solar Energy Center and Florida Power and Light are collaborating to retrofit a large...

283

Sandia National Laboratories Waste Isolation Pilot Plant  

E-Print Network [OSTI]

and Decision Analysis Dept. 6711 Sandia National Laboratories Carlsbad Programs Group Carlsbad, NM 88220 SNL

284

Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008  

SciTech Connect (OSTI)

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first receipt of waste in March 1999 through the end of 2008, 57,873 m3 of TRU waste had been disposed of at the WIPP facility.

Washington Regulatory and Enviromnetal Services

2009-09-21T23:59:59.000Z

285

Application to Export Electric Energy OE Docket No. EA-383 Pilot...  

Broader source: Energy.gov (indexed) [DOE]

Power Group, Inc Application from Pilot Power Group, Inc. to export electric energy to Mexico. EA-383 Pilot Power Group.pdf More Documents & Publications EA-383 Pilot Power...

286

Energy Department Announces New Lab Program to Accelerate Commercialization of Clean Energy Technologies  

Broader source: Energy.gov [DOE]

WASHINGTON Today, the Department of Energy launched a new $2.3 million pilot program to accelerate the transfer of innovative clean energy technologies from the DOEs National Laboratories into the commercial marketplace

287

Resource Conservation and Recovery Act, Part B permit application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 11, Chapter D, Appendix D4--Chapter D, Appendix D17: Revision 3  

SciTech Connect (OSTI)

This volume contains appendices D4 through D17 which cover the following: Waste Isolation Pilot Plant site environmental report; ecological monitoring program at the Waste Isolation Pilot Plant; site characterization; regional and site geology and hydrology; general geology; dissolution features; ground water hydrology; typical carbon sorption bed efficiency; VOC monitoring plan for bin-room tests; chemical compatibility analysis of waste forms and container materials; probable maximum precipitation; WHIP supplementary roof support system room 1, panel 1; and corrosion risk assessment of the Waste Isolation Pilot Plant ``humid`` test bins.

Not Available

1993-03-01T23:59:59.000Z

288

Animal Cancer Care and Research Program Summer 2011  

E-Print Network [OSTI]

Synergy Animal Cancer Care and Research Program Summer 2011 Michael G. Conzemius, D.V.M., Ph Cancer Care and Research Program 2 · Synergy Summer 2011 COTC016: A pilot study to assess feasibility Clinical Sciences, College of Veterinary Medicine and Masonic Cancer Center T he University of Minnesota

Minnesota, University of

289

Pilot Phase of a Field Study to Determine Waste of Water and Energy in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Phase of a Field Study to Determine Waste of Water and Energy in Phase of a Field Study to Determine Waste of Water and Energy in Residential Hot-Water Distribution Systems Title Pilot Phase of a Field Study to Determine Waste of Water and Energy in Residential Hot-Water Distribution Systems Publication Type Report LBNL Report Number LBNL-4985E Year of Publication 2011 Authors Lutz, James D., Peter J. Biermayer, and Derek A. King Subsidiary Authors Energy Analysis Department Document Number LBNL-4985E Pagination 29 Date Published January 1 Publisher Lawrence Berkeley National Laboratory City Berkeley ISBN Number LBNL-4985E Abstract This paper provides an overview of the pilot phase of a field study to determine the feasibility of a method of directly measuring the waste of water and energy caused by current hot water distribution systems (HWDS) in California residences using wireless sensor network technologies. The experience gained in the pilot phase study using wireless sensor networks demonstrates that it is clearly feasible to use this technology for measuring water and gas flows and temperatures.The goal was to demonstrate a method to reliably collect water flow and temperature data from every indoorhot water end use point, at the water heater in one second intervals when water was flowing. The overall success of the pilot phase study indicates that this technique can work. However, the pilot phase study did reveal shortcomings in many areas. The recommendations in this paper address those shortcomings and provide ways to improve the outcomes of any follow-on field study. The project's tasks were to test and evaluate the proposed hardware, installation protocols, data collection, and processing procedures. The techniques developed in this project provide a way to accurately measure temperature and flow of indoor water use events at one second resolution. The technologies used in this pilot phase study are viable for use in a larger field study to determine the energy and water efficiency of hot water distribution systems in California homes. The lessons learned from this experience will improve procedures, programming and wireless sensor network specifications.

290

Waste Isolation Pilot Plant Transportation Security  

Broader source: Energy.gov (indexed) [DOE]

WIPP WIPP Transportation Security Gregory M. Sahd Security Manager Carlsbad Field Office U.S. Department of Energy Contact Information Gregory M. Sahd Security Operations Carlsbad Field Office * U.S. Department of Energy 575.234.8117 * Greg.Sahd@wipp.ws WIPP Transportation "...The (WIPP transportation) system is safer than that employed for any other hazardous material in the U.S...." - National Academy of Sciences, WIPP Panel Hanford Idaho National Engineering and Environmental Laboratory Los Alamos National Laboratory Rocky Flats Environmental Technology Site Savannah River Site Waste Isolation Pilot Plant Argonne National Laboratory - East Nevada Test Site Argonne National Laboratory - West Lawrence Livermore National Laboratory CBFO Manager Senior Management

291

Vitrification pilot plant experiences at Fernald, Ohio  

SciTech Connect (OSTI)

A one metric ton/day Vitrification Pilot Plant (VITPP) at Fernald, Ohio, simulated the vitrification of radium and radon bearing silo residues using representative non-radioactive surrogates containing high concentrations of lead, sulfates, and phosphates. The vitrification process was carried out at temperatures of 1,150 to 1,350 C. The VITPP processed glass for seven months, until a breach of the melter containment vessel suspended operations. More than 70,000 pounds of surrogate glass were produced by the VITPP. Experiences, lessons learned, and path forward will be presented.

Akgunduz, N. [Dept. of Energy Fernald Field Office, Cincinnati, OH (United States); Gimpel, R.F.; Paine, D.; Pierce, V.H. [Fluor Daniel Fernald, Cincinnati, OH (United States)

1997-07-18T23:59:59.000Z

292

Sorghum Program BIOENERGY PROGRAM  

E-Print Network [OSTI]

Sorghum Program BIOENERGY PROGRAM Sorghums are important nongrain lignocellulosic feedstocks Biomass Switch Grass Forage Sorghum Bioenergy Sorghum Biomass per acre per year that can be converted (DT

293

Head of EM Visits Waste Isolation Pilot Plant for First Underground...  

Office of Environmental Management (EM)

Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour Since February Incidents Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour Since...

294

Novel Carbon Capture Solvent Begins Pilot-Scale Testing for Emissions...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Novel Carbon Capture Solvent Begins Pilot-Scale Testing for Emissions Control Novel Carbon Capture Solvent Begins Pilot-Scale Testing for Emissions Control January 13, 2015 -...

295

The Gemini Observatory Fast Turnaround Program  

E-Print Network [OSTI]

Gemini's Fast Turnaround program is intended to greatly decrease the time from having an idea to acquiring the supporting data. The scheme will offer monthly proposal submission opportunities, and proposals will be reviewed by the principal investigators or co-investigators of other proposals submitted during the same round. Here, we set out the design of the system and outline the plan for its implementation, leading to the launch of a pilot program at Gemini North in January 2015.

Mason, R E; Kissler-Patig, M; Levenson, N A; Adamson, A; Emmanuel, C; Crabtree, D

2014-01-01T23:59:59.000Z

296

Pilot Plant Study of Carbon Dioxide Capture by Aqueous Monoethanolamine  

E-Print Network [OSTI]

i Pilot Plant Study of Carbon Dioxide Capture by Aqueous Monoethanolamine Topical Report Prepared Pilot Plant Study of Carbon Dioxide Capture by Aqueous Monoethanolamine Ross Edward Dugas, M capture using monoethanolamine (MEA). MEA is an appropriate choice for a baseline study since

Rochelle, Gary T.

297

Perspectives in Practice A Garden Pilot Project Enhances Fruit and  

E-Print Network [OSTI]

RESEARCH Perspectives in Practice A Garden Pilot Project Enhances Fruit and Vegetable Consumption among Children STEPHANIE HEIM, MPH, RD; JAMIE STANG, PhD, MPH, RD; MARJORIE IRELAND, PhD ABSTRACT Fruit a strategy for increasing fruit and vegetable intake in chil- dren. A 12-week pilot intervention was designed

Maxwell, Bruce D.

298

End User Impacts of Automated Electrochromic Windows in a Pilot  

E-Print Network [OSTI]

LBNL-6027E End User Impacts of Automated Electrochromic Windows in a Pilot Retrofit Application E Electrochromic Windows in a Pilot Retrofit Application Eleanor S. Lee1 Abstract , Erin S. Claybaugh Building Independence Avenue, S.W., Washington, DC 20585 USA Automated electrochromic (EC) windows, advanced thermally

299

Safety Warnings Quad Rotors (Quad-Pilot 2 F.3)  

E-Print Network [OSTI]

Safety Warnings Quad Rotors (Quad-Pilot 2 F.3) The quad rotor "quad-pilot 2 F.3" is a complicated accidents from taking place. Operation of the quad rotor should be performed in a safe and responsible not accept any liability for damage and consequent damage arising from the use of the quad rotors, as we have

Langendoen, Koen

300

Multi-Agent Autonomous Pilot for Motorcycles Dana Vrajitoru  

E-Print Network [OSTI]

Multi-Agent Autonomous Pilot for Motorcycles Dana Vrajitoru Intelligent Systems Laboratory Indiana with an automatic pilot. The application is written in OpenGL and includes a model of a vehicle (a motorcycle) based (Mourant & Marangos 2003). Our approach targets motorcycles which have not yet been studied as extensively

Vrajitoru, Dana

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A Pilot Case Study of Measurement and Verification for a Major Texas State Agency Performance Contracting Initiative  

E-Print Network [OSTI]

A PILOT CASE STUDY OF MEASUREMENT AND VERIFICATION FOR A MAJOR TEXAS STATE AGENCY PERFORMANCE CONTRACTING INITIATIVE Tarek Bou-Saada Energy Manager Texas Health and Human Services Commission Austin, TX Charles Culp, Ph.D., P... as practical measurement and verification techniques. The agency works closely with the ESCO to generate a savings persistence program that both parties can effectively put into practice; thus ensuring long-term goals are met. INTRODUCTION The 77 th...

Bou-Saada, T. E.; Culp, C.

2006-01-01T23:59:59.000Z

302

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint  

SciTech Connect (OSTI)

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

Deru, M.; Field, K.; Punjabi, S.

2014-08-01T23:59:59.000Z

303

Fundamental investigation of Duct/ESP phenomena: 1. 7 MW pilot parametric testing results  

SciTech Connect (OSTI)

Radian Corporation was contracted to investigate duct injection and electrostatic precipitator phenomena in a 1.7-MW pilot plant constructed for this test program. This study was an attempt to resolve previous problems and to answer remaining questions with the technology using an approach which concentrated on the fundamental mechanisms of the process. The goal of the study was to obtain a better understanding of the basic physical and chemical phenomena that control: (1) the desulfurization of flue gas by calcium-based reagent, and (2) the coupling of the duct injection process to an existing ESP particulate collection device. (VC)

McGuire, L.M.; Brown, C.A.

1991-07-22T23:59:59.000Z

304

Perspective of the Science Advisor to the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

In 1975 Sandia National Laboratories (SNL) was asked by the predecessor to the Department of Energy to assume responsibility for the scientific programs necessary to assure the safe and satisfactory development of a geologic repository in the salt beds of southeast New Mexico. Sandia has continued in the role of Science Advisor to the Waste Isolation Pilot Plant (WIPP) to the present time. This paper will share the perspectives developed over the past 25 years as the project was brought to fruition with successful certification by the Environmental Protection Agency (EPA) on May 13, 1998 and commencement of operations on April 26, 1999.

WEART,WENDELL D.

1999-09-03T23:59:59.000Z

305

DOE - Office of Legacy Management -- Pasadena Chemical Corp Pilot Plant -  

Office of Legacy Management (LM)

Pasadena Chemical Corp Pilot Plant Pasadena Chemical Corp Pilot Plant - TX 01 FUSRAP Considered Sites Site: PASADENA CHEMICAL CORP., PILOT PLANT (TX.01) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Olin Mathieson Chemical Corp. Mobil Mining and Minerals TX.01-2 TX.01-1 Location: Pasadena , Texas TX.01-2 Evaluation Year: 1985 TX.01-1 Site Operations: Process development studies and pilot plant testing of uranium recovery from phosphoric acid during the mid-1950s. TX.01-3 Site Disposition: Eliminated - No Authority TX.01-1 TX.01-4 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Natural Uranium TX.01-3 Radiological Survey(s): Yes TX.01-2 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to PASADENA CHEMICAL CORP., PILOT PLANT

306

Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Scoring Tool Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session NORA WANG SUPRIYA GOEL GEOFF ELLIOTT Pacific Northwest National Laboratory JUNE 18, 2013 Meet the Team U.S. Department of Energy (DOE) � Project oversight � Strategic direction � Policy perspective Pacific Northwest National Laboratory (PNNL) � Technical lead � Scoring Tool development and maintenance SRA International (SRA) � Pilot management � Outreach and communications 2 I Energy Asset Score eere.energy.gov Pilot Participation Process 1. Sign the Pilot Participation Agreement by June 26 2. Provide DOE with points of contact for lead project coordinator and data collector(s)/tool user(s) by June 26 3. DOE provides Pilot Participants with username and password to

307

Home Energy Score Pilot Analysis Webinar (Text Version) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Pilot Analysis Webinar (Text Version) Pilot Analysis Webinar (Text Version) Home Energy Score Pilot Analysis Webinar (Text Version) Below is a text version of the webinar titled "Home Energy Score: Analysis and Improvements to Date," originally presented on July 24, 2012. In addition to this text version of the audio, you can access the presentation slides and a recording of the webinar. Slide 2: To date based on the pilot findings, tell you a little bit about the analysis that we did over the last year or so, partly from the pilots and then also through another piece of analysis that NREL did for us using model data and also utility bill data. And then, finally I will tell you a little bit about our next steps and what were are planning as we move forward with implementation, both in terms of implementation, but with an

308

Stakeholder Engagement and Outreach: Wind for Schools Pilot Project Results  

Wind Powering America (EERE)

Pilot Project Results Pilot Project Results In 2006, the Wind Powering America team based at the National Renewable Energy Laboratory (NREL) launched a pilot project in Colorado to develop the Wind for Schools project model. The pilot project identified the key elements of a successful Wind for Schools project. This page summarizes these elements. Although the Wind for Schools project ended on September 30, 2013, these lessons learned can be helpful for others planning school turbine installations. Identify a Champion A project cannot succeed without a local project champion, an individual, or group to keep the key players in the community informed, cooperating, and moving toward project goals. During the Colorado pilot project, the Wind Powering America team learned that the project development stages of

309

Waste Isolation Pilot Plant, Land Management Plan  

SciTech Connect (OSTI)

To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

Not Available

1993-12-01T23:59:59.000Z

310

Compliance status report for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

Not Available

1994-03-31T23:59:59.000Z

311

Regulatory basis for the Waste Isolation Pilot Plant performance assessment  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is the first operational repository designed for the safe disposal of transuranic (TRU) radioactive waste from the defense programs of the US Department of Energy (DOE). The US Environmental Protection Agency (EPA) is responsible for certifications and regulation of the WIPP facility for the radioactive components of the waste. The EPA has promulgated general radioactive waste disposal standards at 40 CFR Part 191. and WIPP-specific criteria to implement and interpret the generic disposal standards at 40 CFR Part 194. In October 1996. the DOE submitted its Compliance Certification Application (CCA) to the EPA to demonstrate compliance with the disposal standards at Subparts B and C of 40 CFR Part 191. This paper summarizes the development of the overall legal framework for radioactive waste disposal at the WIPP, the parallel development of the WIPP performance assessment (PA), and how the EPA disposal standards and implementing criteria formed the basis for the CCA WIPP PA. The CCA resulted in a certification in May 1998 by the EPA of the WIPP'S compliance with the EPA's disposal standard, thus enabling the WIPP to begin radioactive waste disposal.

HOWARD,BRYAN A.; CRAWFORD,M.B.; GALSON,D.A.; MARIETTA,MELVIN G.

2000-05-22T23:59:59.000Z

312

Short-term pilot cooling tower tests  

SciTech Connect (OSTI)

Two major problems are associated with the use of cooled geothermal water as coolant for the 5 MW(e) pilot plant at Raft River. They are: (1) a scaling potential owing to the chemical species present in solution, and (2) the corrosive nature of the geothermal water. Tests were conducted to obtain data so that methods can be devised to either reduce or eliminate effects from these problems. Data show that scaling can be prevented, but only by using a high concentration of dispersant. Pitting data, however, are not as conclusive and seem to indicate that pitting control cannot be realized, but this result cannot be substantiated without additional experimentation. Results also demonstrate that chromate can be removed by using either chemical destruction or ion exchange. Whichever method is used, EPA discharge limits for both chromate and zinc can be achieved. A preliminary economic analysis is presented.

Suciu, D.F.; Miller, R.L.

1980-01-01T23:59:59.000Z

313

EIS-0207: Newberry Geothermal Pilot Project  

Broader source: Energy.gov [DOE]

The U.S. Forest Service prepared this statement to analyze three alternatives and associated environmental impacts for it to enable the CEE Exploration Company of Portland, Oregon to build and operate a geothermal pilot project and supporting facilities capable of generating 33 megawatts of electric power in the Deschutes National Forest in central Oregon. The Department of Energys Bonneville Power Administration (BPA) served as a cooperating agency in preparing this statement in order to fulfill its National Environmental Policy Act obligations ahead of its statutory obligations to purchase and transmit power to customers in the Pacific Northwest, if it is decided that the project will proceed. BPA adopted this statement by October 1994.

314

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report- August 2002  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant

315

Use Matlab Code to Link and Pilot Softwares Used for MEMS Simulation.  

E-Print Network [OSTI]

Use Matlab Code to Link and Pilot Softwares Used for MEMS Simulation. H. ACHKAR1 , D. PEYROU1 , F. Then, an explication is done on how we piloted ABAQUS using a Matlab routine. In a third and very on piloting software using Matlab, especially Abaqus (COMSOL is already piloted by Matlab and we are trying

Paris-Sud XI, Université de

316

Microsoft Word - Basalt Pilot Phase II Fact Sheet FY08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

16.0 Basalt Pilot 1 16.0 Basalt Pilot 1 FACTSHEET FOR PARTNERSHIP FIELD VALIDATION TEST Partnership Name Big Sky Regional Carbon Partnership Contacts: DOE/NETL Project Mgr. Name Organization E-Mail David Lang NETL LANG@netl.doe.gov Principal Investigator Lee Spangler Field Test Information: Basalt Sequestration Pilot Test Test Location Near Wallula township in Eastern Washington State Amount and Source of CO 2 Tons Source 3000 Refinery Field Test Partners (Primary Sponsors) Pacific Northwest National Lab - Pacific Northwest Division, Idaho

317

Arlington County - Green Building Incentive Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Arlington County - Green Building Incentive Program Arlington County - Green Building Incentive Program Arlington County - Green Building Incentive Program < Back Eligibility Commercial Construction Installer/Contractor Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Water Heating Wind Program Info State Virginia Program Type Green Building Incentive Provider Arlington County In October 1999, the County Board of Arlington adopted a Pilot Green Building Incentive Program using the standards established by the U. S. Green Building Council's Leadership in Energy and Environmental Design

318

Office of Educational Programs | Collaborations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collaborate With Us Collaborate With Us The energetic and experienced staff at Brookhaven's Office of Educational Programs continue to identify, design, and implement cutting-edge educational initiatives with other equally committed partners. Recent examples include: New York State Center for Technology and Academic Research: This program, in its pilot phase, will reach 12 middle school teachers in New York State -- and over 900 of their students -- in 2005 alone. Brookhaven will expand this program in future years to include many more students and teachers. Dowling College Center for Minority Teacher Development and Training: Now it its second year, this program integrates college faculty and Laboratory scientists with minority undergraduate and high school students who plan to

319

History of geophysical studies at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico  

SciTech Connect (OSTI)

A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and potential field techniques have supported characterization, monitoring and experimental studies at the Waste Isolation Pilot Plant (WIPP). The geophysical studies have provided significant understanding of the nature of site deformation, tectonics and stability. Geophysical methods have delineated possible brine reservoirs beneath the underground facility and have defined the disturbed rock zone that forms around underground excavations. The role of geophysics in the WIPP project has evolved with the project. The early uses were for site characterization to satisfy site selection criteria or factors. As the regulatory framework for WIPP grew since 1980, the geophysics program supported experimental and field programs such as Salado hydrogeology and underground room systems and excavations. In summary, the major types of issues that geophysical studies addressed for WIPP are: Site Characterization; Castile Brine Reservoirs; Rustler/Dewey Lake Hydrogeology; Salado Hydrogeology; and Excavation Effects. The nature of geophysics programs for WIPP has been to support investigation rather than being the principal investigation itself. The geophysics program has been used to define conceptual models (e.g., the Disturbed Rock Zone-DRZ) or to test conceptual models (e.g., high transmissivity zones in the Rustler Formation). The geophysics program primarily supported larger characterization and experimental programs. Funding was not available for the complete documentation and interpretation. Therefore, a great deal of the geophysics survey information resides in contractor reports.

Borns, D.J. [Sandia National Labs., Albuquerque, NM (United States). Geophysics Dept.

1997-03-05T23:59:59.000Z

320

Technology Cooperation Agreement Pilot Project development-friendly greenhouse gas reduction, May 1999 update  

SciTech Connect (OSTI)

The Technology Cooperation Agreement Pilot Project (TCAPP) was launched by several U.S. Government agencies (USAID, EPA and DOE) in August 1997 to establish a model for climate change technology cooperation with developing and transition countries. TCAPP is currently facilitating voluntary partnerships between the governments of Brazil, China, Kazakhstan, Korea, Mexico, and the Philippines, the private sector, and the donor community on a common set of actions that will advance implementation of clean energy technologies. The six participating countries have been actively engaged in shaping this initiative along with international donors and the private sector. This program helps fulfill the US obligation to support technology transfer to developing countries under Article 4.5 of the United Nations Framework Convention on Climate Change. TCAPP also provides a mechanism to focus resources across international donor programs on the technology cooperation needs of developing and transition countries.

Benioff, R.

1999-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Limestone/adipic acid FGD and stack opacity reduction pilot plant tests at Big Rivers  

SciTech Connect (OSTI)

Big Rivers Electric Corporation (BREC) contracted Peabody Process Systems, Inc. (PPSI) to install a flue gas cleaning (FGC) pilot plant at the BREC R.D. Green Station Unit No. 2 located at Sebree, KY. A six month test program was completed demonstrating technology for: alternatives to using lime as an alkali; methods for improving cake dewatering; identification of the causes of high stack opacity; and methods for the reduction of high stack opacity. This paper presents highlights extracted from the reports submitted by PPSI to BREC on this test program. BREC was primarily interested in reduction of operating costs, if possible, by using an alkali less expensive than lime, and by improving the poor dewatering characteristic inherent in a dolomitic lime system. BREC was also within compliance for particulate emissions and opacity in the duct after the dry electrostatic precipitator, but not in compliance with the stack opacity regulation, and therefore wanted to investigate methods for stack opacity reduction.

Laslo, D.; Bakke, E.; Chisholm, E.

1984-01-01T23:59:59.000Z

322

Texas Offshore Pilot Research Project | Open Energy Information  

Open Energy Info (EERE)

Texas Offshore Pilot Research Project Texas Offshore Pilot Research Project Jump to: navigation, search Name Texas Offshore Pilot Research Project Facility Texas Offshore Pilot Research Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Gulf of Mexico TX Coordinates 26.186°, -97.077° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.186,"lon":-97.077,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

323

ARM - Field Campaign - Water Cycle Pilot Study Intensive Observations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govCampaignsWater Cycle Pilot Study Intensive Observations govCampaignsWater Cycle Pilot Study Intensive Observations Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Water Cycle Pilot Study Intensive Observations 2002.04.01 - 2002.06.30 Lead Scientist : Marvin Wesely For data sets, see below. Description The U.S. DOE Water Cycle Pilot Study (WCPS) is a 3-year feasibility investigation focused on accurately evaluating the water cycle components and using stable isotopes as an effective tool in doing so. The study area is primarily the Whitewater subbasin in the Walnut River Watershed in southeastern Kansas. Two intensive observations periods are planned, this first one in April to June 2002 and a second currently scheduled for December 2002 to February 2003. Observations will be made of precipitation

324

Michigan Offshore Wind Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Offshore Wind Pilot Project Offshore Wind Pilot Project Jump to: navigation, search Name Michigan Offshore Wind Pilot Project Facility Michigan Offshore Wind Pilot Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Mighigan Alternative and Renewable Energy Center Developer Mighigan Alternative and Renewable Energy Center Location Muskegon Lake MI Coordinates 43.231°, -86.307° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.231,"lon":-86.307,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

325

DOE - Office of Legacy Management -- Waste Isolation Pilot Plant - 019  

Office of Legacy Management (LM)

Waste Isolation Pilot Plant - 019 Waste Isolation Pilot Plant - 019 FUSRAP Considered Sites Site: Waste Isolation Pilot Plant (019) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Waste Isolation Pilot Plant, or WIPP, is the world¿s first underground repository licensed to safely and permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists primarily of clothing, tools, rags, and other disposable items contaminated with small amounts of radioactive elements, mostly plutonium. After more than 20 years of scientific study and public input, WIPP began operations on March 26, 1999. Located in the remote

326

Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 |  

Broader source: Energy.gov (indexed) [DOE]

November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a severe NPE. Independent Oversight Review, Waste Isolation Pilot Plant - November 2012

327

Pilot Application to Nuclear Fuel Cycle Options | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pilot Application to Nuclear Fuel Cycle Options Pilot Application to Nuclear Fuel Cycle Options Pilot Application to Nuclear Fuel Cycle Options A Screening Method for Guiding R&D Decisions: Pilot Application to Screen Nuclear Fuel Cycle Options The Department of Energy's Office of Nuclear Energy (DOE-NE) invests in research and development (R&D) to ensure that the United States will maintain its domestic nuclear energy capability and scientific and technical leadership in the international community of nuclear power nations in the years ahead. The 2010 Nuclear Energy Research and Development Roadmap presents a high-level vision and framework for R&D activities that are needed to keep the nuclear energy option viable in the near term and to expand its use in the decades ahead. The roadmap identifies the development

328

DOE Waste Isolation Pilot Plant Receives EPA Recertification | Department  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Receives EPA Recertification Waste Isolation Pilot Plant Receives EPA Recertification DOE Waste Isolation Pilot Plant Receives EPA Recertification March 29, 2006 - 9:42am Addthis CARLSBAD, NM - The U.S. Department of Energy's (DOE) Carlsbad Field Office today reached a significant milestone when its Waste Isolation Pilot Plant (WIPP) was recertified by the U.S. Environmental Protection Agency (EPA). This decision indicates that after a thorough evaluation of the physical state and performance of the facility, the WIPP meets EPA regulatory requirements for facilities that dispose of transuranic waste. The waste facility recertification process occurs every five years and is directed by Congress in the WIPP Land Withdrawal Act (LWA). "EPA's recertification reinforces the important mission of WIPP to safely

329

In situ combustion - from pilot to commercial application  

SciTech Connect (OSTI)

In 1994, there are at least 14 active commercial in-situ combustion (ISC) projects worldwide. A review of these projects is carried out in order to emphasize the important factors which contributed to the success of the processes. The success of the developing an ISC pilot into a commercial ISC project is strongly connected with two factors: (a) starting the operation from the uppermost part of the structure and extending the process downwards and (b) application of the line drive well configuration instead of patterns, whenever is possible. An effective, peripheral line drive operation requires pool utilization. The most challenging phase towards commercialization of an ISC project is the field pilot design, implementation and evaluation. This paper is focused on the advantages of locating ISC pilot at the upper zone of the reservoir, due to the need for a full scale integration of the pilot with the subsequent semi- and commercial development of the process.

Turta, A. [Petroleum Recovery Institute, Alberta (Canada)

1995-02-01T23:59:59.000Z

330

Americium/Curium Vitrification Pilot Tests - Part II  

SciTech Connect (OSTI)

Isotopes of americium (Am) and curium (Cm) were produced in the past at the Savannah River Site (SRS) for research, medical, and radiological applications. These highly radioactive and valuable isotopes have been stored in an SRS reprocessing facility for a number of years. Vitrification of this solution will allow the material to be more safely stored until it is transported to the DOE Oak Ridge Reservation for use in research and medical applications. A previous paper described operation results from the Am-Cm Melter 2A pilot system, a full-scale non-radioactive pilot facility. This paper presents the results from continued testing in the Pilot Facility and also describes efforts taken to look at alternative vitrification process operations and flowsheets designed to address the problems observed during melter 2A pilot testing.

Marra, J.E. [Westinghouse Savannah River Company, AIKEN, SC (United States); Baich, M.A.; Fellinger, A.P.; Hardy, B.J.; Herman, D.T.; Jones, T.M.; Miller, C.B.; Miller, D.H.; Snyder, T. K.; Stone, M.E.

1998-05-01T23:59:59.000Z

331

Interagency Pilot of Greenhouse Gas Accounting Tools: Lessons Learned  

SciTech Connect (OSTI)

The Greater Yellowstone Area (GYA) and Tongass National Forest (Tongass) partnered with the National Renewable Energy Laboratory (NREL) to conduct a pilot study of three greenhouse gas (GHG) inventorying tools.

Carpenter, A.; Hotchkiss, E.; Kandt, A.

2013-02-01T23:59:59.000Z

332

Design of a Pilot Plant Fluidized Bed Gasifier  

Science Journals Connector (OSTI)

This article presents the design principles for a biomass fluidized bed gasifier pilot plant. The fluidized bed gasifier has a nominal capacity of 400 kg ... most important parameters for the performance of the gasifier

K. Maniatis; V. Vassilatos; S. Kyritsis

1993-01-01T23:59:59.000Z

333

US Department of Energy Waste Isolation Pilot Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

US Department of Energy Waste Isolation Pilot Plant New Mexico Statute 24-16 Sections 1-4 Compliance Policy DOEWIPP-11-3480 Revision 0 September 2011 The U.S. Department of Energy...

334

DRAFT. ENVIRONMENTAL ASSESSMENT OCEAN THERMAL ENERGY CONVERSION (OTEC) PILOT PLANTS  

E-Print Network [OSTI]

fossil-fuel intake canals for withdrawing marine waters;Some marine supplies and water are available. Bunker fuels.marine ecosystem effects caused by Pilot Plant operation are associated with the seawater discharge and approximately fossil-fuel

Sullivan, S.M.

2014-01-01T23:59:59.000Z

335

10 MWe Solar Thermal Central Receiver Pilot Plant Heliostat Evaluation  

Science Journals Connector (OSTI)

At the 10 MWe Solar Central Receiver Pilot Plant near Barstow, California, the beam characterization system (BCS) has been upgraded and a sunshape measurement system has been added. Heliostat mirror cleanliness h...

C. L. Mavis

1985-01-01T23:59:59.000Z

336

Report to Congress on the Use of the Waste Isolation Pilot Plant to Develop and Demonstrate Transparency Technologies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the the Use of the Waste Isolation Pilot Plant to Develop and Demonstrate Transparency Technologies Introduction This report describes the Department of Energy's plan for evaluating the use of the Waste Isolation Pilot Plant (WIPP) repository system to develop transparency technologies. This report fulfills the requirement of Senate Report 106-50 on the National Defense Authorization Act for Fiscal Year 2000 for the Department of Energy (DOE) to develop a plan to establish a nuclear waste disposal demonstration test bed facility. Congressional Request In Report 106-50 the Senate Armed Services Committee directed DOE to develop a plan to establish a demonstration and training program using the WIPP repository system as a test bed facility to develop transparent monitoring technologies for waste storage

337

NETL: Ion Advanced Solvent CO2 Capture Pilot Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ion Advanced Solvent CO2 Capture Pilot Project Ion Advanced Solvent CO2 Capture Pilot Project Project No.: DE-FE0013303 ION Engineering is conducting small pilot-scale (~ 0.7 MW) testing of an advanced CO2 capture solvent technology that has previously undergone bench-scale testing. The small pilot-scale testing will involve continuous long-term operation in order to gather the necessary data ultimately required for further scale-up. Activities will include the design and fabrication of the 0.5-0.7 MWe (equivalent) slipstream pilot plant; scale-up of solvent manufacturing; testing, data collection, and analysis of solvent performance; degradation and air emission analysis; modeling and simulation for the detailed preliminary and final techno-economic analyses; and decommissioning of pilot plant equipment upon completion of solvent testing. The advanced solvent is anticipated to have significant operating and capital cost advantages over other solvents currently in development. Advantages include significant reductions in parasitic load and liquid flow rates which directly translate to smaller more efficient CO2 capture processes. Make-up water and amine emissions rates will be examined during this project. There is the potential that additional solvent, system, and integration savings will be identified, which could result in further operating and capital cost reductions.

338

Energy Efficiency and Conservation Block Grant Program  

Broader source: Energy.gov (indexed) [DOE]

FL-City-Tallahassee FL-City-Tallahassee Location: City Tallahassee FL American Recovery and Reinvestment Act: Proposed Action or Project Description 1) Use consultant to develop new dynamic rates and direct load control programs; 2) purchase equipment and software to enhance capability of the city's energy audit program; 3) provide commercial, residential and builder financial incentives (rebates) for energy efficiency improvements and green building; 4) convert conventional fleet vehicles to electric power, pilot program for installation of vehicle charging stations throughout city, and replacing vehicles with hybrid vehicles; 5) purchase energy efficiency equipment for several city buildings and integration of city buildings onto the Central Energy Management

339

Final environmental impact statement. Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

Not Available

1980-10-01T23:59:59.000Z

340

Waste Isolation Pilot Plant site environmental report, for calendar year 1995  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

NONE

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Photovoltaics (PV) as an Eligible Measure in Residential PACE Programs: Benefits and Challenges, Energy Analysis (Fact Sheet)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

significant significant barrier to investing in renewable energy and comprehensive energy efficiency improvements to homes across the country is the initial capital cost. Property Assessed Clean Energy (PACE) financing is one of several new financial models broadening access to clean energy by addressing this upfront cost issue. Recently, the White House cited PACE programs as an important element of its "Recovery through Retrofit" plan. 1 The residential PACE model 2 involves the creation of a special clean energy financing district that homeowners elect to opt into. Once opted in, the local government (usually at the city or county level) finances the upfront investment of the renewable energy installation and/or energy efficiency improvements. A special lien is attached

342

Community Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Programs Friends of Berkeley Lab Navigate Section Community Richmond Bay Campus Planning Tours Community Programs Friends of Berkeley Lab Community Education Programs...

343

The AISI direct steelmaking program  

SciTech Connect (OSTI)

After six months of operation of the pilot plant, the viability of in-bath smelting combined with a high level of post combustion has been demonstrated, and the opportunity exists for an early commercialization of the direct ironmaking part of the process while we continue to research direct steelmaking. The program should be of equal interest to integrated and electric furnace producers. Smelting of ore provides virgin iron units. Additionally, the process has the flexibility of melting scrap and varying the ore-to-scrap ratio over wide ranges. This process does not require coke, thus eliminating the cokemaking operation, a major source of environmental concern.

Aukrust, E. (LTV Steel Co., Inc., Cleveland, OH (United States)); Downing, K.B. (Inland Steel Flat Products Co. (United States))

1991-01-01T23:59:59.000Z

344

SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 2. Preliminary pilot plant design  

SciTech Connect (OSTI)

The preliminary design of a solar water desalination pilot plant is presented. Pilot plant drawings and process descriptions are provided. Use of solar and wind energy are discussed. Testing, performance and cost of the pilot plant are studied. (BCS)

Not Available

1986-01-01T23:59:59.000Z

345

Better Buildings Program San Jose- Serving Moderate Income Residents  

Broader source: Energy.gov [DOE]

Provides an overview of the program components and goals, including the whole neighborhood approach pilot which aims to streamline participant, contractor, and administration processes for neighborhood retrofitting in order to reduce high transaction costs created by the current one-off delivery model.

346

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

NONE

1995-03-31T23:59:59.000Z

347

Student Internship Programs Program Description  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Student Internship Programs Program Description The objective of the Laboratory's student internship programs is to provide students with opportunities for meaningful hands- on...

348

Background monitoring of air toxics at the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP), located southeast of Carlsbad, New Mexico, has been constructed as a permanent repository for containerized solid or solidified transuranic (TRU) mixed waste. The repository is constructed in a massive salt bed formation, 2,150 feet below the surface. The WIPP has been granted a No-Migration Variance by the US Environmental Protection Agency (EPA) according to the requirements of 40 CFR 268.6. As part of the variance, a detailed air monitoring program has been developed for the facility. The purpose of the program is to detect airborne releases of hazardous constituents at the earliest practicable time. Routine background monitoring for volatile organic compounds (VOCs) has been performed at WIPP for the last two years. The monitoring program routinely quantifies airborne concentrations of five VOCs in the ventilation airstream of the underground facility, using Compendium Method TO-14. This paper describes the monitoring program in-place at the facility and presents a summary of the monitoring results for the last two years.

Frank-Supka, L.; Wu, C.F.; Lopez, R.H. [Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.; Zimmer, R.A. [Harding Lawson Associates, Denver, CO (United States)

1994-12-31T23:59:59.000Z

349

Annual site environmental monitoring report for the Waste Isolation Pilot Plant, Calendar year 1985  

SciTech Connect (OSTI)

This is the first Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP project is operated by the US Department of Energy (DOE) for the purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes generated by the defense activities of the U.S. Government. The report provides a comprehensive description of environmental activities at WIPP during Calendar Year 1985, including: a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of environmental program information, including an update on the status of environmental permits and compliance activities; a presentation of the findings of the Radiological Baseline Program (RBP), which is a program to characterize radionuclide activities in the environment around the WIPP site; and a summary of findings of the Ecological Monitoring Program (EMP), which examines non-radiological impacts of WIPP construction on the surrounding ecosystem. The WIPP facility is under construction, and will not receive radioactive wastes before October 1988. Therefore, this report describes the status of preoperational (as opposed to operational) environmental activities. 29 refs., 17 figs., 22 tabs.

Reith, C.; Prince, K.; Fischer, T.; Rodriguez, A.; Uhland, D.; Winstanley, D.

1986-04-01T23:59:59.000Z

350

Inspection of Emergency Management at the Waste Isolation Pilot Plant- Volume II, August 2002  

Broader source: Energy.gov [DOE]

The Secretary of Energys Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP emergency management program. The results of the review of the WIPP environment, safety, and health (ES&H) programs are discussed in Volume I of this report, and the combined results are discussed in a summary report. The results of this review indicate that, overall, CBFO and WTS have effectively addressed nearly all of the weaknesses identified during the May 2000 OA emergency management review. Furthermore, as a consequence of that effort, CBFO and WTS have implemented a hazardous material emergency management program that, with few exceptions, meets Departmental expectations for providing a system that protects responders, site workers, and the public in the event of an emergency at WIPP. Section 2 of this volume provides an overall discussion of the results of the review of the WIPP emergency management program, including positive aspects, findings, and other items requiring management attention. Section 3 provides OAs conclusions regarding the overall effectiveness of CBFO and WTS management of the emergency management program. Section 4 presents the ratings assigned as a result of this review. Appendix A provides supplemental information, including team composition. Appendix B identifies the findings that require corrective action and follow-up. Appendices C- F detail the results of the reviews of individual emergency management program elements.

351

WIPP Security Contractor Receives DOE Voluntary Protection Program Award |  

Broader source: Energy.gov (indexed) [DOE]

Contractor Receives DOE Voluntary Protection Program Contractor Receives DOE Voluntary Protection Program Award WIPP Security Contractor Receives DOE Voluntary Protection Program Award October 24, 2012 - 12:00pm Addthis Department of Energy Carlsbad Field Site Operations Director Casey Gadbury (right) and Farok Sharif, President and Project Manager for Nuclear Waste Partnership LLC, the management and operating contractor at the Waste Isolation Pilot Plant, present the DOE's Voluntary Protection Program Legacy Star Award to Richard De Los Santos, protective force manager for Security Walls, the security contractor at the Waste Isolation Pilot Plant. The DOE-VPP legacy star award is the highest level of recognition possible in the VPP. Department of Energy Carlsbad Field Site Operations Director Casey Gadbury

352

Pilot light in the air conditioner  

SciTech Connect (OSTI)

The California Energy Commission (CEC) recently modified its Residential Energy Standards Point Program to include the electricity consumed by crankcase heaters in air conditioners and heat pumps. Turning off the unit during the off season can save the homeowner a few bucks per month. 2 references, 1 figure.

Kovach, A.; Meier, A.

1987-09-01T23:59:59.000Z

353

Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 |  

Broader source: Energy.gov (indexed) [DOE]

April April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a shadowing oversight activity to review the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) oversight of the Waste Isolation Pilot Plant (WIPP). This Independent Oversight activity was performed by HSS Office of Safety and Emergency Management Evaluations personnel shadowing the CBFO's review of the WIPP operating contractor's Work Control Improvement Plan implementation and effectiveness review, and CBFO's annual review of the contractor's Integrated Safety Management System (ISMS), specifically

354

DOE - Office of Legacy Management -- Reduction Pilot Plant - WV 01  

Office of Legacy Management (LM)

Reduction Pilot Plant - WV 01 Reduction Pilot Plant - WV 01 FUSRAP Considered Sites Site: REDUCTION PILOT PLANT (WV.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: International Nickel Company WV.01-1 Location: Cole Street at Alterizer Ave. , Huntington , West Virginia WV.01-2 Evaluation Year: 1987 WV.01-1 Site Operations: Manufactured powdered Nickel for use at Paducah and Portsmouth gaseous diffusion plants and Nickel plated a small quantity of Uranium slugs. WV.01-2 WV.01-1 Site Disposition: Eliminated - Limited quantities of radioactive material used on the site. Potential for residual radioactive material from AEC operations conducted at the site considered remote - confirmed by radiological survey. WV.01-1 WV.01-3

355

DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot  

Office of Legacy Management (LM)

Chemical Construction Co Linden Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for recovering uranium, cobalt, nickel, and copper from low grade residues. NJ.12-5 NJ.12-6 NJ.12-7 Site Disposition: Eliminated - Potential for contamination considered remote due to nature and duration of the operations NJ.12-4 NJ.12-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.12-6

356

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects(Redirected from MHK Projects/bioSTREAM Pilot Plant) Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

357

NETL: Mercury Emissions Control Technologies - Pilot Testing of Mercury  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing of Mercury Oxidation Catalysts Project Summary Testing of Mercury Oxidation Catalysts Project Summary URS Group, Inc., Austin, TX, will demonstrate at the pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion, and the use of a wet flue gas desulfurization (FGD) system downstream to remove the oxidized mercury at high efficiency. The project's pilot tests, conducted at electric generating plants using wet flue gas desulfurization systems and particulate collection systems, will be conducted for periods up to 14 months to provide data for future, full-scale designs. Mercury-oxidation potential will be measured periodically to provide long-term catalyst life data. The project is applicable to about 90,000 megawatts of generation capacity. Project partners are the Electric Power Research Institute, Palo Alto, CA, which will co-manage and co-fund the pilot tests, and five utilities.

358

EA-1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii |  

Broader source: Energy.gov (indexed) [DOE]

1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii 1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii EA-1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii Summary This EA evaluates the environmental impacts of a proposal, through a cooperative agreement with Phycal, Inc. to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost information and test data to access its viability for implementation at a future commercial scale. If approved, DOE would provide approximately 80 percent of the funding for the project. Public Comment Opportunities

359

Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize  

Broader source: Energy.gov (indexed) [DOE]

Plant Typifies Optimizing Resources to Plant Typifies Optimizing Resources to Maximize Results Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize Results March 5, 2013 - 12:00pm Addthis EM Carlsbad Field Office (CBFO) Manager Joe Franco, right, presents a memento to EM Senior Advisor Dave Huizenga EM Carlsbad Field Office (CBFO) Manager Joe Franco, right, presents a memento to EM Senior Advisor Dave Huizenga Three HalfPACT transportation packages on a Waste Isolation Pilot Plant (WIPP) truck are parked inside the exhibit hall at the 2013 Waste Management Conference. WIPP featured the exhibit as part of outreach to visitors at the annual gathering in Phoenix. Three HalfPACT transportation packages on a Waste Isolation Pilot Plant (WIPP) truck are parked inside the exhibit hall at the 2013 Waste

360

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation  

Broader source: Energy.gov (indexed) [DOE]

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise May 1, 2012 - 12:00pm Addthis A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia.

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives November 14, 2013 - 12:00pm Addthis Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. The crushed salt is used as a supplement in cattle feed. Since the salt from WIPP has been mined from the middle of a large salt formation, its quality is high, according to Magnum Minerals.

362

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation  

Broader source: Energy.gov (indexed) [DOE]

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise May 1, 2012 - 12:00pm Addthis A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia.

363

Waste Isolation Pilot Plant 2003 Site Environmental Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

submitted as required to: submitted as required to: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Prices available from (615) 576-8401 Additional information about this document may be obtained by calling (800) 336-9477. Copies may be obtained by contacting the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Road, Springfield, VA 22161 Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management and Operating Contractor for the U.S. Department of Energy under Contract No. DE-AC04-01AL66444. Waste Isolation Pilot Plant 2003 Site Environmental Report DOE/WIPP 04-2225 i EXECUTIVE SUMMARY The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose

364

Hydrogen Fuel Pilot Plant and Hydrogen ICE Vehicle Testing  

SciTech Connect (OSTI)

The U.S. Department Energy's Advanced Vehicle Testing Activity (AVTA) teamed with Electric Transportation Applications (ETA) and Arizona Public Service (APS) to develop the APS Alternative Fuel (Hydrogen) Pilot Plant that produces and compresses hydrogen on site through an electrolysis process by operating a PEM fuel cell in reverse; natural gas is also compressed onsite. The Pilot Plant dispenses 100% hydrogen, 15 to 50% blends of hydrogen and compressed natural gas (H/CNG), and 100% CNG via a credit card billing system at pressures up to 5,000 psi. Thirty internal combustion engine (ICE) vehicles (including Daimler Chrysler, Ford and General Motors vehicles) are operating on 100% hydrogen and 15 to 50% H/CNG blends. Since the Pilot Plant started operating in June 2002, they hydrogen and H/CNG ICE vehicels have accumulated 250,000 test miles.

J. Francfort (INEEL)

2005-03-01T23:59:59.000Z

365

MHK Technologies/European Pico Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

European Pico Pilot Plant European Pico Pilot Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage European Pico Pilot Plant.jpg Technology Profile Primary Organization Wave Energy Centre Project(s) where this technology is utilized *MHK Projects/OWC Pico Power Plant Technology Resource Click here Wave Technology Type Click here Oscillating Water Column Technology Readiness Level Click here TRL 4: Proof of Concept Technology Description A bottom mounted shoreline oscillating water column structure equipped with a horizontal axis Wells turbine generator set and a guide vane stator installed on each side of the rotor Control options are facilitated by a relief valve presently a slow acting valve with plans to substitute a fast acting mechanism in the wave chamber

366

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives November 14, 2013 - 12:00pm Addthis Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. The crushed salt is used as a supplement in cattle feed. Since the salt from WIPP has been mined from the middle of a large salt formation, its quality is high, according to Magnum Minerals.

367

E-Print Network 3.0 - alcohol pilot study Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

pilot study Search Powered by Explorit Topic List Advanced Search Sample search results for: alcohol pilot study Page: << < 1 2 3 4 5 > >> 1 Influence of Age at Drinking Onset on...

368

Waste Isolation Pilot Plant Land Management Plan DOE/WIPP-93...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Waste Isolation Pilot Plant Land Management Plan DOEWIPP-93-004 Reprint 01082013 Waste Isolation Pilot Plant Land Management Plan DOEWIPP-93-004 2 This page intentionally left...

369

GE Teams with NY College to Pilot SOFC Technology |GE Global...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hudson Valley Community College to Pilot GE Solid Oxide Fuel Cell Technology Hudson Valley Community College to Pilot GE Solid Oxide Fuel Cell Technology GE - Fuel Cells to install...

370

New Pilot Study on Sea Level Rise Offers Approach That Can Help...  

Broader source: Energy.gov (indexed) [DOE]

Pilot Study on Sea Level Rise Offers Approach That Can Help Communities Assess Possible Impact of Sea Level Rise on Energy Assets New Pilot Study on Sea Level Rise Offers Approach...

371

E-Print Network 3.0 - air pollution pilot Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

pilot Search Powered by Explorit Topic List Advanced Search Sample search results for: air pollution pilot Page: << < 1 2 3 4 5 > >> 1 Real-Time Monitoring and Mapping of Air...

372

Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Corn-to-Ethanol Corn-to-Ethanol Research Pilot Plant to someone by E-mail Share Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Facebook Tweet about Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Twitter Bookmark Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Google Bookmark Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Delicious Rank Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Digg Find More places to share Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Corn-to-Ethanol Research Pilot Plant The Illinois Ethanol Research Advisory Board manages and operates the

373

MHK Projects/Portugal Pre Commercial Pilot Project | Open Energy  

Open Energy Info (EERE)

Portugal Pre Commercial Pilot Project Portugal Pre Commercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

374

Microsoft Word - Bldg 100 Pilot Test.doc  

Office of Legacy Management (LM)

DOE-LM/GJ791-2005 DOE-LM/GJ791-2005 Pinellas Environmental Restoration Project Young - Rainey STAR Center Building 100 Area Enhanced Bioremediation Pilot Test Final Report January 2005 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy Building 100 Area Enhanced Bioremediation Pilot Test Final Report January 2005 Page ii Contents 1.0 Introduction......................................................................................................................... 1 2.0 Results from the May 2004 (P8) Sampling Event .............................................................. 1 3.0 Microorganism Data

375

Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico  

SciTech Connect (OSTI)

This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

Not Available

1993-07-01T23:59:59.000Z

376

FTCP FY09 Operational Plan GOAL 2 White Paper - Mentoring Programs  

Broader source: Energy.gov (indexed) [DOE]

Page 1 of 3 Page 1 of 3 FTCP White Paper Regarding Mentoring Programs Available To Technical Qualification Program Employees in DOE and NNSA Introduction: The FTCP FY2009 Operational Plan Goal 2 (Preserve and Enhance Technical Credibility) calls for "Establishing an Effective Mid-Level Recruitment Program", and to "Establish an effective mentoring program" to ensure critical knowledge transfer in designated Technical Qualification positions affecting defense nuclear facilities. The Operational Plan Team researched existing programs within the Department and determined that DOE has been successfully managing a mentoring program and NNSA piloted and is in the process of establishing a formal mentoring program. The Team recommended and the FTCP agreed to use

377

Edinburgh Research Explorer PROSPECTIV-a pilot trial of a nurse-led psychoeducational  

E-Print Network [OSTI]

Edinburgh Research Explorer PROSPECTIV-a pilot trial of a nurse-led psychoeducational intervention, 'PROSPECTIV-a pilot trial of a nurse-led psychoeducational intervention delivered in primary care to prostate date: 16. Jun. 2014 #12;PROSPECTIV--a pilot trial of a nurse-led psychoeducational intervention

Millar, Andrew J.

378

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental problems, to minimize risks to the environment or public health, and to anticipate and address pote

Westinghouse Electric Company Waste Isolation Division

1999-09-29T23:59:59.000Z

379

The ARM unpiloted aerospace vehicle (UAV) program  

SciTech Connect (OSTI)

Unmanned aerospace vehicles (UAVs) are an important complement to the DOE`s Atmospheric Radiation Measurement (ARM) Program. ARM is primarily a ground-based program designed to extensively quantify the radiometric and meteorological properties of an atmospheric column. There is a need for airborne measurements of radiative profiles, especially flux at the tropopause, cloud properties, and upper troposphere water vapor. There is also a need for multi-day measurements at the tropopause; for example, in the tropics, at 20 km for over 24 hours. UAVs offer the greatest potential for long endurance at high altitudes and may be less expensive than piloted flights. 2 figs.

Sowle, D. [Mission Research Corporation, Santa Barbara, CA (United States)

1995-09-01T23:59:59.000Z

380

History of geophysical studies at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico  

SciTech Connect (OSTI)

A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and potential field techniques have used support characterization, monitoring and experimental studies at the Waste Isolation Pilot Plant (WIPP). The geophysical studies have provided significant understanding of the nature of site deformation, tectonics and stability. Geophysical methods have delineated possible brine reservoirs beneath the underground facility and have defined the disturbed rock zone that forms around underground excavations. The role of geophysics in the WIPP project has evolved with the project. The early uses were for site characterization to satisfy site selection criteria or factors. As the regulatory framework for WIPP grew since 1980, the geophysics program was focused on support of experimental and field programs such as Salado hydrogeology and underground room systems and excavations. In summary, the major types of issues that geophysical studies addressed for WIPP are: Issue 1: Site Characterization; Issue 2: Castile Brine Reservoirs; Issue 3: Rustler /Dewey Lake Hydrogeology; Issue 4: Salado Hydrogeology; and Issue 5: Excavation Effects. The nature of geophysics program for WIPP has been to support investigation rather than being the principal investigation itself. The geophysics program has been used to define conceptual models (e.g., the Disturbed Rock Zone-DRZ) or to test conceptual models (e.g., high transmissivity zones in the Rustler Formation). An effect of being a support program is that as new project priorities arose the funding for the geophysics program was limited and withdrawn. An outcome is that much of the geophysics survey information resides in contractor reports since final interpretation reports were not funded.

Borns, D.J. [Sandia National Labs., Albuquerque, NM (United States)

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Austria-Program on Technologies for Sustainable Development | Open Energy  

Open Energy Info (EERE)

Austria-Program on Technologies for Sustainable Development Austria-Program on Technologies for Sustainable Development Jump to: navigation, search Name Austria-Program on Technologies for Sustainable Development Agency/Company /Organization Nachhaltig Wirtschaften Sector Energy Focus Area Renewable Energy Topics Background analysis, Technology characterizations Website http://www.nachhaltigwirtschaf Country Austria UN Region Western Europe References Program on Technologies for Sustainable Development[1] Background "This initiative has been developed by the Austrian Federal Ministry of Transport, Innovation and Technology (BMVIT). It initiates and supports trendsetting research and development projects and the implementation of exemplary pilot projects." Objectives "*New opportunities for the economy

382

Savannah River Site 2012 Outlook: Transuranic Waste Program Set to Safely  

Broader source: Energy.gov (indexed) [DOE]

Site 2012 Outlook: Transuranic Waste Program Set to Site 2012 Outlook: Transuranic Waste Program Set to Safely Reach Milestone Savannah River Site 2012 Outlook: Transuranic Waste Program Set to Safely Reach Milestone January 1, 2012 - 12:00pm Addthis By May, Savannah River Nuclear Solutions expects to be shipping transuranic waste to the Waste Isolation Pilot Plant almost continuously, using six TRUPACT-III shipping containers like the one shown here. By May, Savannah River Nuclear Solutions expects to be shipping transuranic waste to the Waste Isolation Pilot Plant almost continuously, using six TRUPACT-III shipping containers like the one shown here. Workers relocate a pipe overpack container used to transport small amounts of excess plutonium oxide destined for long-term storage at the Waste Isolation Pilot Plant in Carlsbad, New Mexico.

383

BNL/NASA Radiobiology Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

General General Radiobiology Home AGS Description NSRL Description NSRL Images NASA Space Radiation Summer School NSRL Beam Info NSRL Users Beamline Requests Steps to Complete Prior to Your Experiment First Time Users Guide Related Links Biosciences Dept. Collider-Accelerator Dept. RHIC/AGS User Center NASA Space Research NASA-USRA Space Radiation Program Space Radiobiology A Collaborative Project sponsored by the NASA Space Radiation Program Manned space exploration in the 21st century holds exciting prospects for the advancement of science and the expansion of the human experience. Plans include the Alpha space station, an outpost on the Moon, exploration of near asteroids, and a piloted mission to Mars. However, for space exploration to go on, human crew members must be protected against the harsh environment of space, in particular, against the hazards of ionizing radiation. The radiation environment in space consists of high energy protons and high energy heavy ions (HZE).

384

VOC Emission Control with the Brayton Cycle Pilot Plant Operations  

E-Print Network [OSTI]

A mobile pilot plant capable of removing VOC emissions from exhaust air streams was cooperatively funded by SCE, EPRI, 3M, and NUCON. Valuable information about the process and the recovery operation has been gained by performing tests at a number...

Enneking, J. C.

385

Pilot Stabilisatie Cavernes Twente Advies over reikwijdte en detailniveau  

E-Print Network [OSTI]

Pilot Stabilisatie Cavernes Twente Advies over reikwijdte en detailniveau van het ondergrondse holtes (cavernes) ontstaan. Van deze cavernes voldoen er 63 niet aan de huidige regels ter voorkoming van daling aan het aardoppervlak.1 In de huidige praktijk worden potentieel instabiele2 cavernes

Hack, Robert

386

A Pilot Project in Preparation of an Aerodynamic Optimization Workshop  

E-Print Network [OSTI]

A Pilot Project in Preparation of an Aerodynamic Optimization Workshop with Lessons Learned John C-scale Aerodynamic Optimization Workshop. Three independent optimization efforts were conducted concurrently, each in the preparation of a possible future workshop on aerodynamic shape optimization. 1.0 Introduction During AIAA

Jameson, Antony

387

Results from the Texas Pilot Project on Superior Energy Performance  

E-Print Network [OSTI]

Energy Performance. Five plants in Texas are participating in this national pilot project, which began July 2008. ESL-IE-09-05-02 Proceedings of the Thirty-First Industrial Energy Technology Conference, New Orleans, LA, May 12-15, 2009 ...

Ferland, K.

388

PILOTING UTILITY MODELING APPLICATIONS (PUMA) UTILITY BRIEFING PAPERS  

E-Print Network [OSTI]

1 PILOTING UTILITY MODELING APPLICATIONS (PUMA) UTILITY BRIEFING PAPERS Utility Page Seattle Public Utilities 2 Tampa Bay Water 6 San Francisco Public Utilities Commission 11 New York City Department of Environmental Protection 15 Portland Water Bureau 20 #12;2 SEATTLE PUBLIC UTILITIES Utility Briefing Paper

389

Making the World a Witness report on the pilot phase  

E-Print Network [OSTI]

of this unlikely consortium as the beginning of a paradigm shift, when instruments of national security, heretoforeMaking the World a Witness report on the pilot phase december 2010 - june 2012 Satellite Sentinel december 2010 - june 2012 Satellite Sentinel Project #12;Table of Contents Introduction by Charlie Clements

Liu, Xiaole Shirley

390

Regional Drinking Water Security District Level Pilot Project  

E-Print Network [OSTI]

Regional Drinking Water Security District Level Pilot Project Concept Note Milind Sohoni Head that most habitations of several talukas will face drinking water stress for much of the coming year. The central objective of the project will be to ensure regional drinking water security for a district

Sohoni, Milind

391

Commonwealth Organics-to-Energy Program (Massachusetts) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Commonwealth Organics-to-Energy Program (Massachusetts) Commonwealth Organics-to-Energy Program (Massachusetts) Commonwealth Organics-to-Energy Program (Massachusetts) < Back Eligibility Agricultural Commercial Local Government State Government Savings Category Commercial Heating & Cooling Manufacturing Buying & Making Electricity Bioenergy Maximum Rebate Varies by type of grant Program Info Funding Source Massachusetts Clean Energy Center (MassCEC) State Massachusetts Program Type State Grant Program Rebate Amount Technical Assistance: $60,000 Feasibility: $40,000 Construction: 25% project cost Pilot: 50% project cost Provider Massachusetts Clean Energy Center *All program solicitations are closed. Please check with MassCEC in 2013 for program updates. The Massachusetts Clean Energy Center (MassCEC) offers a Commonwealth

392

New Mexico Gas Company - Commercial Efficiency Programs | Department of  

Broader source: Energy.gov (indexed) [DOE]

Commercial Efficiency Programs Commercial Efficiency Programs New Mexico Gas Company - Commercial Efficiency Programs < Back Eligibility Commercial Institutional Schools Savings Category Heating & Cooling Commercial Heating & Cooling Heating Other Appliances & Electronics Water Heating Program Info Expiration Date 3/31/2013 State New Mexico Program Type Utility Rebate Program Rebate Amount Storage Water Heater: $550 - 700 Tankless Water Heater: $250 - $300 Commercial Clothes Washer: $100 Furnace: $400 - $500 Boiler: $50 Condensing Boiler: $600 Gas Griddle: $50 Steam Cooker: $50 Gas Convection Oven: $1,000 Fryer: $700 Dish Washer: $150 Custom: $0.75/therm SCORE Pilot Program: Varies, contact New Mexico Gas Company The New Mexico Gas Company Commercial Energy Efficiency programs provide energy savings for businesses using natural gas for cooking and water

393

Gulf Power - Solar Thermal Water Heating Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Gulf Power - Solar Thermal Water Heating Program Gulf Power - Solar Thermal Water Heating Program Gulf Power - Solar Thermal Water Heating Program < Back Eligibility Low-Income Residential Multi-Family Residential Residential Savings Category Heating & Cooling Solar Water Heating Maximum Rebate $1,000 Program Info State Florida Program Type Utility Rebate Program Provider Energy Efficiency '''''This program reopened on October 3, 2011 for 2012 applications. Funding is limited and must be reserved through online application before the installation of qualifying solar water heating systems. See Gulf Power's [http://www.gulfpower.com/renewable/solarThermal.asp Solar Water Heating] web site for more information.''''' Gulf Power offers a Solar Thermal Water Heating rebate to customers who install water heaters. This program started after the original pilot

394

Integrated Computational Materials Engineering (ICME) for Mg: International Pilot Project  

Broader source: Energy.gov [DOE]

2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

395

Integrated Computational Materials Engineering (ICME) for Mg: International Pilot Project  

Broader source: Energy.gov [DOE]

2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

396

Program Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will participate in a wide spectrum of program and project management activities involving systems engineering and integration support for Defense Programs...

397

Program Managers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Managers Program Managers Enabling remarkable discoveries and tools that transform our understanding of energy and matter and advance national, economic, and energy...

398

Retiree Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Library Services Retiree Program Retiree Program The Research Library offers a 1 year library card to retired LANL employees that allows usage of Library materials. This service...

399

Educational Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Educational Programs Educational Programs A collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering...

400

Two Approaches to the Geologic Disposal of Long-Lived Nuclear Waste: Yucca Mountain, Nevada and the Waste Isolation Pilot Plant, Carlsbad, New Mexico  

SciTech Connect (OSTI)

A key component of the US energy program is to provide for the safe and permanent isolation of spent nuclear fuel and long-lived radioactive waste produced through programs related to national defense and the generation of electric power by nuclear utilities. To meet this challenge, the US Department of Energy (DOE) has developed a multi-faceted approach to the geologic disposal of long-lived nuclear wastes. Two sites are being developed or studied as current or potential deep geologic repositories for long lived radioactive wastes, the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico and Yucca Mountain, Nevada.

Levich, R. A.; Patterson, R. L.; Linden, R. M.

2002-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental Programs Environmental Programs Committee  

E-Print Network [OSTI]

(Architecture) The Environmental Programs Committee coordinates courses and curricula on environmental topics. Wiesner (Civil and Environmental Engineering) Gordon G. Wittenberg (Architecture) #12;162 Environmental Programs Environmental Programs Committee Walter Whitfield Isle, Chair (English

Richards-Kortum, Rebecca

402

Performance Demonstration Program Management Plan  

SciTech Connect (OSTI)

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organizations quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

403

PILOT SCALE TESTING OF MONOSODIUM TITANATE MIXING FOR THE SRS SMALL COLUMN ION EXCHANGE PROCESS - 11224  

SciTech Connect (OSTI)

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and select actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending monosodium titanate (MST), crystalline silicotitanate (CST), and simulated sludge. The purpose of this pilot scale testing is to determine the requirements for the pumps to suspend the MST particles so that they can contact the strontium and actinides in the liquid and be removed from the tank. The pilot-scale tank is a 1/10.85 linear scaled model of SRS Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX program (Risers B5 and B2 for two pump configurations and Risers B5, B3, and B1 for three pump configurations). The conclusions from this work follow: (i) Neither two standard slurry pumps nor two quad volute slurry pumps will provide sufficient power to initially suspend MST in an SRS waste tank. (ii) Two Submersible Mixer Pumps (SMPs) will provide sufficient power to initially suspend MST in an SRS waste tank. However, the testing shows the required pump discharge velocity is close to the maximum discharge velocity of the pump (within 12%). (iii) Three SMPs will provide sufficient power to initially suspend MST in an SRS waste tank. The testing shows the required pump discharge velocity is 66% of the maximum discharge velocity of the pump. (iv) Three SMPs are needed to resuspend MST that has settled in a waste tank at nominal 45 C for four weeks. The testing shows the required pump discharge velocity is 77% of the maximum discharge velocity of the pump. Two SMPs are not sufficient to resuspend MST that settled under these conditions.

Poirier, M.; Restivo, M.; Williams, M.; Herman, D.; Steeper, T.

2011-01-25T23:59:59.000Z

404

INVESTIGATING SUSPENSION OF MST, CST, AND SIMULATED SLUDGE SLURRIES IN A PILOT-SCALE WASTE TANK  

SciTech Connect (OSTI)

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending and resuspending monosodium titanate (MST), crystalline silicotitanate (CST), and simulated sludge. The purpose of this pilot scale testing is for the pumps to resuspend the MST, CST, and simulated sludge particles so that they can be removed from the tank, and to suspend the MST so it can contact strontium and actinides. The pilot-scale tank is a 1/10.85 linear scaled model of Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX program (Risers B5, B3, and B1). Previous testing showed that three Submersible Mixer Pumps (SMPs) will provide sufficient power to initially suspend MST in an SRS waste tank, and to resuspend MST that has settled in a waste tank at nominal 45 C for four weeks. The conclusions from this analysis are: (1) Three SMPs will be able to resuspend more than 99.9% of the MST and CST that has settled for four weeks at nominal 45 C. The testing shows the required pump discharge velocity is 84% of the maximum discharge velocity of the pump. (2) Three SMPs will be able to resuspend more than 99.9% of the MST, CST, and simulated sludge that has settled for four weeks at nominal 45 C. The testing shows the required pump discharge velocity is 82% of the maximum discharge velocity of the pump. (3) A contact time of 6-12 hours is needed for strontium sorption by MST in a jet mixed tank with cooling coils, which is consistent with bench-scale testing and actinide removal process (ARP) operation.

Poirier, M.; Qureshi, Z.; Restivo, M.; Steeper, T.; Williams, M.

2011-05-24T23:59:59.000Z

405

Chicopee Electric Light - Commercial Energy Efficiency Rebate Program  

Broader source: Energy.gov (indexed) [DOE]

Chicopee Electric Light - Commercial Energy Efficiency Rebate Chicopee Electric Light - Commercial Energy Efficiency Rebate Program (Massachusetts) Chicopee Electric Light - Commercial Energy Efficiency Rebate Program (Massachusetts) < Back Savings Category Other Appliances & Electronics Commercial Lighting Lighting Maximum Rebate $25,000; 30% of total cost if project did not recieve financing from CEL, 20% of total cost if project did recieve financing from CEL Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Custom: $0.17 per annual kWh saved Lighting: $0.17 per annual kWh saved New Construction: $0.17 per annual kWh saved Provider Program Administrator Chicopee Electric Light (CEL) offers a Pilot Energy Efficiency Program to encourage non-residential, commercial, and industrial facilities to pursue

406

Entergy New Orleans - Residential Solar Water Heating Program (Louisiana) |  

Broader source: Energy.gov (indexed) [DOE]

Entergy New Orleans - Residential Solar Water Heating Program Entergy New Orleans - Residential Solar Water Heating Program (Louisiana) Entergy New Orleans - Residential Solar Water Heating Program (Louisiana) < Back Eligibility Residential Savings Category Heating & Cooling Solar Water Heating Maximum Rebate Residential Solutions: $1000/improvement Program Info Start Date 1/1/2011 State Louisiana Program Type Utility Rebate Program Rebate Amount kWh savings(annual) x $0.34/kWh Provider Energy Smart Solutions Center Entergy New Orleans offers a Solar Water Heater Rebate pilot program designed to help residential customers make energy efficiency improvements. Rebates will be offered on a first-come, first-served basis and reflected on the invoice as a discount. All systems must be OG 300 rated and incentive amount is based on kWh savings. Walk-through energy assessments

407

National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island (Fact Sheet)  

SciTech Connect (OSTI)

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a DER pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. 37 of these projects were comprehensive retrofits while 5 were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. The 42 DER projects represent 60 units of housing. The comprehensive projects all implemented a consistent "package" of measures in terms of the performance targeted for major building components. Projects exhibited some variations in the approach to implementing the retrofit package. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects. Post-retrofit energy use was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Homeowner surveys were returned by 12 of the pilot participants. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

Not Available

2014-03-01T23:59:59.000Z

408

Performance Results for Massachusetts and Rhode Island Deep Energy Retrofit Pilot Community  

SciTech Connect (OSTI)

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a DER pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. 37 of these projects were comprehensive retrofits while 5 were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. The 42 DER projects represent 60 units of housing. The comprehensive projects all implemented a consistent 'package' of measures in terms of the performance targeted for major building components. Projects exhibited some variations in the approach to implementing the retrofit package. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects. Post-retrofit energy use was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Homeowner surveys were returned by 12 of the pilot participants. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

Gates, C.; Neuhauser, K.

2014-03-01T23:59:59.000Z

409

IMPROVEMENT TO PIPELINE COMPRESSOR ENGINE RELIABILITY THROUGH RETROFIT MICRO-PILOT IGNITION SYSTEM-PHASE I  

SciTech Connect (OSTI)

This report documents the first year's effort towards a 3-year program to develop micropilot ignition systems for existing pipeline compressor engines. In essence, all Phase I goals and objectives were met. We intend to proceed with the Phase II research plan, as set forth by the applicable Research Management Plan. The objective for Phase I was to demonstrate the feasibility of micropilot ignition for large bore, slow speed engines operating at low compression ratios. The primary elements of Micropilot Phase I were to develop a single-cylinder test chamber to study the injection of pilot fuel into a combustion cylinder and to develop, install and test a multi-cylinder micropilot ignition system for a 4-cylinder, natural gas test engine. In all, there were twelve (12) tasks defined and executed to support these two (2) primarily elements in a stepwise fashion. Task-specific approaches and results are documented in this report. Research activities for Micropilot Phase I were conducted with the understanding that the efforts are expected to result in a commercial product to capture and disseminate the efficiency and environmental benefits of this new technology. An extensive state-of-art review was conducted to leverage the existing body of knowledge of micropilot ignition with respect to retrofit applications. Additionally, commercially-available fuel injection products were identified and applied to the program where appropriate. This approach will minimize the overall time-to-market requirements, while meeting performance and cost criteria. The four-cylinder prototype data was encouraging for the micro-pilot ignition technology when compared to spark ignition. Initial testing results showed: (1) Brake specific fuel consumption of natural gas was improved from standard spark ignition across the map, 1% at full load and 5% at 70% load. (2) 0% misfires for all points on micropilot ignition. Fuel savings were most likely due to this percent misfire improvement. (3) THC (Total Hydrocarbon) emissions were improved significantly at light load, 38% at 70% load. (4) VOC (Volatile Organic Compounds) emissions were improved above 80% load. (5) Coefficient of Variance for the IMEP (Indicated Mean Effective Pressure) was significantly less at lower loads, 76% less at 70%. These preliminary results will be substantiated and enhanced during Phase II of the Micropilot Ignition program.

Ted Bestor

2003-03-04T23:59:59.000Z

410

Waste Isolation Pilot Plant 2002 Site Environmental Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

reproduced directly from the best possible copy. It is reproduced directly from the best possible copy. It is available to DOE and DOE contractors from the following address: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Prices available from (615) 576-8401 Available to the public from the National Technical Information Services United States Department of Commerce 5285 Port Royal Road Springfield, Virginia 22161 Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management and Operating Contractor for the U.S. Department of Energy under Contract No. DE-AC04-01AL66444. Waste Isolation Pilot Plant 2002 Site Environmental Report DOE/WIPP 03-2225 iii ACKNOWLEDGMENTS We appreciate the reviews by Harold Johnson and Dr. E. B. Nuckols of the United

411

MHK Projects/bioWAVE Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

bioWAVE Pilot Plant bioWAVE Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-37.8197,"lon":144.964,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

412

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

413

MHK Projects/CETO Precommercial Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Precommercial Pilot Project Precommercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-32.2509,"lon":115.651,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

414

05 JGI Call Pilot User Guide - 11x17  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Call Pilot Call Pilot Quick Reference Guide 11/1/05 Forwarding a message (cont'd) 3. When you have finished entering addresses, press # again to end the list. 4. Press 5 if you want to record an introduction. Wait for the tone, begin recording, then press #. 5. Press 7 9 to send the message. Composing a message To compose a message, you address it first, then record your message and send it. You can address a message to one or more people or distribution lists. Before you send a message, you can edit it and add message options. To address, record, and send a message 1. While logged in to your mailbox, press 7 5. 2. Enter the first address, then press #. 3. Continue to enter addresses followed by #. 4. Press 0 # to cancel the last address you en- tered in the list. Repeat this step for each ad-

415

Hydrogen Pilot Project Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Project Wind Farm Project Wind Farm Jump to: navigation, search Name Hydrogen Pilot Project Wind Farm Facility Hydrogen Pilot Project Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Idaho Synthetic Fuels Developer Idaho Synthetic Fuels Location South of Boise ID Coordinates 43.5141°, -116.088° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.5141,"lon":-116.088,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

416

High efficiency waste to energy facility -- Pilot plant design  

SciTech Connect (OSTI)

Waste To Energy facilities are commonly acceptable to the environment and give benefits in two main areas: one is a hygienic waste disposal and another is waste heat energy recovery to save fossil fuel consumption. Recovered energy is used for electricity supply, and it is required to increase the efficiency of refuse to electric energy conversion, and to spread the plant construction throughout the country of Japan, by the government. The national project started in 1992, and pilot plant design details were established in 1995. The objective of the project is to get 30% of energy conversion efficiency through the measure by raising the steam temperature and pressure to 500 C and 9.8 MPa respectively. The pilot plant is operating under the design conditions, which verify the success of applied technologies. This paper describes key technologies which were used to design the refuse burning boiler, which generates the highest steam temperature and pressure steam.

Orita, Norihiko; Kawahara, Yuuzou; Takahashi, Kazuyoshi; Yamauchi, Toru; Hosoda, Takuo

1998-07-01T23:59:59.000Z

417

Obama Administration Announces Job-Creating Grid Modernization Pilot  

Broader source: Energy.gov (indexed) [DOE]

Job-Creating Grid Modernization Job-Creating Grid Modernization Pilot Projects Obama Administration Announces Job-Creating Grid Modernization Pilot Projects October 5, 2011 - 11:52am Addthis Washington, D.C. - Demonstrating its commitment to job creation and modernizing America's infrastructure, the Obama Administration today announced it would accelerate the permitting and construction of seven proposed electric transmission lines. This move will speed the creation of thousands of construction and operations jobs while transforming the nation's electric system into a modern, 21st century grid that is safer and more secure, and gives consumers more energy choices. "The President wants to get America working again. He is committed to cutting red tape and making immediate investments to put people to work

418

Voluntary Agreements for Increasing Energy-Efficiency in Industry: Case Study of a Pilot Project with the Steel Industry in Shandong Province, China  

SciTech Connect (OSTI)

This paper describes international experience with the use of Voluntary Agreements for increasing industrial sector energy-efficiency, drawing lessons learned regarding the essential elements of the more successful programs. The paper focuses on a pilot project for implementation of a Voluntary Agreement with two steel mills in Shandong Province that was developed through international collaboration with experts in China, the Netherlands, and the U.S. Designing the pilot project involved development of approaches for energy-efficiency potential assessments for the steel mills, target-setting to establish the Voluntary Agreement energy-efficiency goals, preparing energy-efficiency plans for implementation of energy-saving technologies and measures, and monitoring and evaluating the project's energy savings.

Price, Lynn; Worrell, Ernst; Sinton, Jonathan; Yun, Jiang

2003-03-01T23:59:59.000Z

419

Wheat Improvement Programs WHEAT PROGRAM  

E-Print Network [OSTI]

. Royalty revenues, which assist funding of programs and attracting/retaining top scientists, have increased

420

Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1  

SciTech Connect (OSTI)

This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

Washington TRU Solutions LLC

2006-04-03T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Pilot-scale tests of HEME and HEPA dissolution process  

SciTech Connect (OSTI)

A series of pilot-scale demonstration tests for the dissolution of High Efficiency Mist Eliminators (HEME`s) and High Efficiency Particulate Airfilters (HEPA) were performed on a 1/5th linear scale. These fiberglass filters are to be used in the Defense Waste Processing Facility (DWPF) to decontaminate the effluents from the off-gases generated during the feed preparation process and vitrification. When removed, these filters will be dissolved in the Decontamination Waste Treatment Tank (DWTT) using 5 wt% NaOH solution. The contaminated fiberglass is converted to an aqueous stream which will be transferred to the waste tanks. The filter metal structure will be rinsed with process water before its disposal as low-level solid waste. The pilot-scale study reported here successfully demonstrated a simple one step process using 5 wt% NaOH solution. The proposed process requires the installation of a new water spray ring with 30 nozzles. In addition to the reduced waste generated, the total process time is reduced to 48 hours only (66% saving in time). The pilot-scale tests clearly demonstrated that the dissolution process of HEMEs has two stages - chemical digestion of the filter and mechanical erosion of the digested filter. The digestion is achieved by a boiling 5 wt% caustic solutions, whereas the mechanical break down of the digested filter is successfully achieved by spraying process water on the digested filter. An alternate method of breaking down the digested filter by increased air sparging of the solution was found to be marginally successful are best. The pilot-scale tests also demonstrated that the products of dissolution are easily pumpable by a centrifugal pump.

Qureshi, Z.H.; Strege, D.K.

1994-06-01T23:59:59.000Z

422

Conceptual design of a black liquor gasification pilot plant  

SciTech Connect (OSTI)

In July 1985, Champion International completed a study of kraft black liquor gasification and use of the product gases in a combined cycle cogeneration system based on gas turbines. That study indicated that gasification had high potential as an alternative to recovery boiler technology and offered many advantages. This paper describes the design of the plant, the construction of the pilot plant, and finally presents data from operation of the plant.

Kelleher, E. G.

1987-08-01T23:59:59.000Z

423

Waste Isolation Pilot Plant Status and Plans - 2012 - 12049  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP), a deep geologic repository for safe disposal of long-lived transuranic radioactive waste related to the nation's defense, is completing its 12. year of operations. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize transuranic (TRU) waste for final shipment and emplacement in WIPP. Five of the 10 disposal panels planned have been filled and sealed from ventilation. Additional small quantity sites have been de-inventoried by consolidating their waste through the certified characterization line at the Idaho National Laboratory (INL). New emplacement methods for RH waste in shielded containers are being considered for disposal by WIPP's regulatory authorities. A new large Type B shipping package, was added to the WIPP transportation fleet, and facility modifications to the WIPP waste unloading and emplacement processes for large containers were completed in 2011. Shipments from the Savannah River site in these new large rectangular packages began in August 2011. Licensing efforts are proceeding for a new criticality control over-pack container that will allow almost twice the fissile content to be shipped than previously. This will reduce the number and cost of shipments of Special Nuclear Material (SNM) declared as waste. Modifications to WIPP regulatory requirements for the disposal footprint and disposal unit closure systems are in progress. These, and other developments, make for exciting times at WIPP. This paper provides an up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository, which is completing its 12. year of operations. A record year of safe and compliant shipments to WIPP tops the list of accomplishments in 2011. Four more small quantity sites were de-inventoried by consolidating their waste through the certified characterization line at INL in 2011. A new Type B shipping package, the TRUPACT-III has been added to the transportation fleet, and large waste boxes are being shipped from SRS without the need for repackaging. New emplacement methods for remote-handled waste in shielded containers are undergoing regulatory review. WIPP plans to license a new criticality control payload container that will allow almost twice the fissile content to be shipped than previously, thereby reducing the number and cost of shipments of SNM declared as waste. Other regulatory modifications planned in 2012 include approval of a design change that would replace the disposal concept for panels 9 and 10 from using the common access drifts (the 'mains') with a new footprint south of panels 4 and 5. DOE also plans to change the panel closure design set forth in its certification by EPA and the HWFP by the NMED. The panel closure design change will be a rule making under EPA's procedures and a class 3 permit modification request under NMED procedures. Plans for achieving 90% of legacy TRU waste retrieval and emplacement in WIPP by 2015 have been developed. Key to the success of this so-called 90/15 plan is adequate funding, both for WIPP operations, as well as for TRU retrieval programs at the generator sites. (authors)

Nelson, Roger A.; Ziemianski, Edward J. [U.S. Department of Energy, Carlsbad, NM 88220 (United States)

2012-07-01T23:59:59.000Z

424

Computational implementation of a systems prioritization methodology for the Waste Isolation Pilot Plant: A preliminary example  

SciTech Connect (OSTI)

A systems prioritization methodology (SPM) is under development to provide guidance to the US DOE on experimental programs and design modifications to be supported in the development of a successful licensing application for the Waste Isolation Pilot Plant (WIPP) for the geologic disposal of transuranic (TRU) waste. The purpose of the SPM is to determine the probabilities that the implementation of different combinations of experimental programs and design modifications, referred to as activity sets, will lead to compliance. Appropriate tradeoffs between compliance probability, implementation cost and implementation time can then be made in the selection of the activity set to be supported in the development of a licensing application. Descriptions are given for the conceptual structure of the SPM and the manner in which this structure determines the computational implementation of an example SPM application. Due to the sophisticated structure of the SPM and the computational demands of many of its components, the overall computational structure must be organized carefully to provide the compliance probabilities for the large number of activity sets under consideration at an acceptable computational cost. Conceptually, the determination of each compliance probability is equivalent to a large numerical integration problem. 96 refs., 31 figs., 36 tabs.

Helton, J.C. [Arizona State Univ., Tempe, AZ (United States). Dept. of Mathematics; Anderson, D.R. [Sandia National Labs., Albuquerque, NM (United States). WIPP Performance Assessments Departments; Baker, B.L. [Technadyne Engineering Consultants, Albuquerque, NM (United States)] [and others

1996-04-01T23:59:59.000Z

425

EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines | Department  

Broader source: Energy.gov (indexed) [DOE]

EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines December 23, 2013 - 12:00pm Addthis Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. The clothing drive’s organizers — Margaret Gee (left), Yolanda Navarrete (center) and Dana Dorr — hold up some of the donated coats before providing them to Carlsbad area schools. Gee is with CBFO and Navarrete and Dorr are with Nuclear Waste Partnership (NWP). NWP's Yolanda Salmon, another drive organizer, is not pictured.

426

Educational Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Programs Programs Argonne National Laboratory Educational Programs Search Argonne ... Search Argonne Home > Educational Programs > Welcome Type of Appointments Postdoctoral Newsletters Postdoctoral Office Activities Postdoctoral Programs Alumni Postdoctoral Society of Argonne Newcomers Assistance Office Postdoctoral Resources Postdoctoral Mentoring Program Contact Us Schedule of Career Development Seminars Organized by the Postdoctoral Office for 2011 Here is a schedule of all of our Career Development Seminars and Workshops! Normally, the events happen at lunchtime and food is provided. The topics of these events include: Journal Clubs Career Development Networking We welcome all of our Postdocs and colleagues to and join us! Wednesday January 19 Postdoc Journal Club and pizza lunch. Magnetic Domain-Wall Racetrack Memory

427

US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project  

Open Energy Info (EERE)

US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Jump to: navigation, search Logo: US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Name US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Agency/Company /Organization National Renewable Energy Laboratory, United States Department of Energy Partner EDIN Initiative Partners Sector Energy Focus Area Energy Efficiency Topics Background analysis, Low emission development planning Website http://www.edinenergy.org/usvi Country US Virgin Islands Latin America and the Caribbean References National Renewable Energy Laboratory, EERE Supported International Activities FY 2009 Annual Operating Plan (August 25, 2009 Abstract The purpose of the EDIN pilot is to have a meaningful impact in a short duration by developing clean energy technologies, policies, and financing mechanisms for the pilot island with projects whose elements can be repeated on other islands.

428

Cockpit learning in power distant cockpits: The interaction effect of pilot's interdependence and inclination to teamwork in airline industry  

Science Journals Connector (OSTI)

Abstract Cockpit learning is an essential feature of flying profession, but it may be hampered by power distance in the cockpit due to captain/co-pilot subordination. Speaking-up to the captain may be difficult for some co-pilots but not speaking-up resulted in numerous aircraft accidents. This research examines cockpit learning among airline pilots and assumes that power distance reduces cockpit learning whereas pilot's interdependence and pilot's inclination towards teamwork can counter balance it. The study develops a short cockpit-learning-scale and validates it through a stratified sample of 231 pilots chosen from British Airways, Pakistan International Airline and Saudi Arabian Airline. Data analysis indicated a strong negative influence of power distance on cockpit learning, and significant interaction effect of pilot's interdependence and pilot's inclination towards teamwork. Together, the findings suggest that pilot's interdependence and inclination towards teamwork significantly minimize the negative influence of power distance on cockpit learning.

Muhammad Aftab Alam

2014-01-01T23:59:59.000Z

429

The Scaleup of Structured Packing from Distillation Pilot Plant Testing to Commercial Application  

E-Print Network [OSTI]

design bases for a distillation train. The actual pilot plant testing involved a different structured packing type and blocked out operations to simulate a large number of theoretical stages. The pilot plant results verified the thermodynamic data... high efficiency per unit height of this structured packing and its excellent sc~leup characteristics. To pilot the large number of theoretical stages, it was decided to divide the column into two sections and run each section in a blocked out...

Berven, O. J.; Ulowetz, M. A.

430

international programs  

National Nuclear Security Administration (NNSA)

9%2A en International Programs http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorisminternationalprograms

431

E-Print Network 3.0 - amblyopia six-month pilot Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

about the dates and places of the workshops and other general... to expand the software architecture . Apply research results to pilot systems Implement robust...

432

BIOENERGY AND BIOFUELS Performance of a pilot-scale continuous flow microbial  

E-Print Network [OSTI]

BIOENERGY AND BIOFUELS Performance of a pilot-scale continuous flow microbial electrolysis cell fed performance. Keywords Biohydrogen . Biomethane . Bioelectricity. Microbial electrolysis cell . Bioenergy

433

Solar Thermal Central Receiver Pilot Plant Overview. Part II: A Utility Perspective  

Science Journals Connector (OSTI)

The Solar One Pilot Plant has been connected to ... to evaluate the plants performance as a utility generation resource.

J. N. Reeves

1985-01-01T23:59:59.000Z

434

The first pilot project of the consortium for top?down...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

USA Received: October 1, 2013 Revised: February 25, 2014 Accepted: March 13, 2014 Pilot Project 1-the identification and characterization of human histone H4 proteoforms by...

435

E-Print Network 3.0 - arsenic pilot plant Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sediments Jason Murnock, Master of Science Candidate, Summary: conflicting. The Erie wastewater treatment plant sludge incinerator flue gas contains arsenic but pilot tests......

436

E-Print Network 3.0 - advanced pilot-scale cryogenic Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

pilot-scale cryogenic Page: << < 1 2 3 4 5 > >> 1 Conventional and advanced thermonuclear ignition in inertial confinement fusion Riccardo Betti Summary: Conventional and...

437

Review of the Waste Isolation Pilot Plant Work Planning and Control...  

Office of Environmental Management (EM)

Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of...

438

Los Angeles Air Force Base Vehicle to Grid Pilot Demonstration  

E-Print Network [OSTI]

Environmental Energy Technologies Division Presented atEnvironmental Security Technology Certification Program (

DeForest, Nicholas

2014-01-01T23:59:59.000Z

439

A heavy oil thermal cracking simulation program  

SciTech Connect (OSTI)

Correlations were developed to simulate the thermal cracking reaction of petroleum vacuum distillation residues through pilot plant data analysis. They use charge properties like specific gravity, viscosity, sulphur content and initial boiling point to give the yield and quality of products as a function of conversion, which is measured in terms of wt.% products with normal boiling point below 350{degrees}C. The mixture is represented with 24 lumps, and kinetic parameters for the reaction feed {r_arrow} products were also found as a function of feedstock properties. Finally, a computer program was developed to simulate fired heater operation for visbreaking and delayed coking units. 3 refs., 10 figs., 1 tab.

Maciel, R. [UNICAMP, Campinas (Brazil); Sugaya, M.F. [Petrobrais, Rio de Janeiro (Brazil)

1996-12-31T23:59:59.000Z

440

C:\WINNT\Profiles\caseys\DESKTOP\L T R C\PICs Program\Permanent Markers\PM Test Plan.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-3175 0-3175 Permanent Markers Testing Program Plan September 28, 2000 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Area Office Carlsbad, New Mexico Permanent Markers Testing Program Plan Waste Isolation Pilot Plant Carlsbad, New Mexico DOE/WIPP 00-3175 September 28, 2000 DOE/WIPP 00-3175 -i- Table of Contents List of Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 Markers Testing Program Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.0 Markers Systems Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 3.1 Screening Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 3.1.1 Large Surface Markers . . . . . . . . . . . .

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

TEST PROGRAM FOR ALUMINA REMOVAL AND SODIUM HYDROXIDE REGENERATION FROM HANFORD WASTE BY LITHIUM HYDROTALCITE PRECIPITATION  

SciTech Connect (OSTI)

This test program sets a multi-phased development path to support the development of the Lithium Hydrotalcite process, in order to raise its Technology Readiness Level from 3 to 6, based on tasks ranging from laboratory scale scientific research to integrated pilot facilities.

SAMS TL; GEINESSE D

2011-01-28T23:59:59.000Z

442

Better Buildings Neighborhood Program: Related Federal Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Related Federal Programs to someone by E-mail Share Better Buildings Neighborhood Program: Related Federal Programs on Facebook Tweet about Better Buildings Neighborhood Program: Related Federal Programs on Twitter Bookmark Better Buildings Neighborhood Program: Related Federal Programs on Google Bookmark Better Buildings Neighborhood Program: Related Federal Programs on Delicious Rank Better Buildings Neighborhood Program: Related Federal Programs on Digg Find More places to share Better Buildings Neighborhood Program: Related Federal Programs on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades Contacts Related Federal Programs Related Links

443

Weatherization and Intergovernmental Program: Program Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Guidance Program Guidance Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: Program Guidance to someone by E-mail Share Weatherization and Intergovernmental Program: Program Guidance on Facebook Tweet about Weatherization and Intergovernmental Program: Program Guidance on Twitter Bookmark Weatherization and Intergovernmental Program: Program Guidance on Google Bookmark Weatherization and Intergovernmental Program: Program Guidance on Delicious Rank Weatherization and Intergovernmental Program: Program Guidance on Digg Find More places to share Weatherization and Intergovernmental Program: Program Guidance on AddThis.com... Closeout Guidance Recovery Act Monitoring & Reporting National Environmental Policy Act

444

Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project  

SciTech Connect (OSTI)

Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

1995-07-01T23:59:59.000Z

445

Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant- Volume I, August 2002  

Broader source: Energy.gov [DOE]

The Secretary of Energys Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP ES&H programs. The results of the review of the WIPP emergency management program are discussed in Volume II of this report, and the combined results are discussed in a summary report. As discussed throughout this report, the ISM program at WIPP is generally effective. Although improvements are warranted in some areas, the current programs have contributed to overall effective ES&H performance and a good safety record at WIPP. Section 2 of this volume provides an overall discussion of the results of the review of the WIPP ES&H programs, including positive aspects and weaknesses. Section 3 provides OAs conclusions regarding the overall effectiveness of CBFO and WTS management of the ES&H programs. Section 4 presents the ratings assigned as a result of this review. Appendix A provides supplemental information, including team composition. Appendix B identifies the specific finding that requires corrective action and follow-up. Appendix C presents the results of the review of selected guiding principles of ISM. Appendix D presents the results of the review of the CBFO and WTS feedback and continuous improvement processes. The results of the review of the application of the core functions of ISM for the selected WIPP activities are discussed in Appendix E.

446

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect (OSTI)

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

447

Hot water geothermal development: opportunities and pilot plant results  

SciTech Connect (OSTI)

It has been projected that up to 11,000 MW of geothermal electric capacity may be on line in the United States by the year 2000. The majority of this capacity will come from hot water geothermal plants, as dry steam resources are limited. Currently, no commercial hot water geothermal capacity exists in the U.S., although, substantial capacity does exist in other countries. Large hot, high temperature resources exist in Southern California's Imperial Valley. Early research work has led to the technical success of a 10 MW unit at Brawley, and to the construction of second generation pilot unit at the Salton Sea resource.

Crane, G.K.

1982-08-01T23:59:59.000Z

448

Waste Isolation Pilot Plant Annual Site Environmental Report for 2012  

SciTech Connect (OSTI)

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

None

2013-09-01T23:59:59.000Z

449

Exempting Kansas City Pilot Project from Department of Energy Orders  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

In a January 18, 2011, memorandum, "Exempting Kansas City Pilot Project from Department of Energy Orders," Linton F. Brooks requested that the Kansas City Site Office develop a plan to dramatically shift oversight at the Kansas City Plant from the current approach to one that relies more heavily on: (1) the expertise of the contractor's parent organization; (2) a more functional management assurance system with real time management information provided by the contractor to the Site Office; and, (3) Federal operational awareness based on KCSO's Line Management Plan. Directives from which KCP would be exempted are DOE O 442.1A, DOE P 450.4, and the 470-series directives.

2011-01-18T23:59:59.000Z

450

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

SciTech Connect (OSTI)

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

Washington Regulatory and Environmental Services (WRES)

2004-10-25T23:59:59.000Z

451

Pilot fruit drier for Los Azufres geothermal field, Michoacan, Mexico  

SciTech Connect (OSTI)

Comision Federal de Electricidad (CFE) has a Division in charge of the exploration of a geothermal reservoir located in Los Azufres, State of Michoacan. At present, CFE is only using the steam of the wells and rejecting the hot water that comes off associated with the steam. Based on a trip to the Los Azufres geothermal field in December of 1992, a design for a pilot geothermal fruit drier was undertaken for CFE. The details of the geothermal field and the local fruit production are detailed.

Lund, J.W.

1993-02-01T23:59:59.000Z

452

Pilot Study of a "Quality of Use" Scale with an Elementary Reading Program  

E-Print Network [OSTI]

Independent School District SLD Specific Learning Disability viii SDAA II State-Developed Alternative Assessment II TAKS Texas Assessment of Knowledge and Skills TAKS-A TAKS Accommodated TAKS-M TAKS Modified TAKS-Alt TAKS Alternative TEA Texas... with learners who are struggling (NASDSE & CASE, 2006). It also becomes part of the process for determining if a student has a specific learning disability (SLD). IDEA 2004 states that, as part of evaluation procedures, a 3 process may be used...

Gragg, Zelma Jane

2012-07-16T23:59:59.000Z

453

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

with a rammed-earth Trombe wall, and traditional Navajorammed~brick walls and Trombe wall, laying out the building

Case, C.W.

2011-01-01T23:59:59.000Z

454

What Do You Think of Fuel Cell Vehicle Pilot Programs? | Department...  

Broader source: Energy.gov (indexed) [DOE]

Addthis Related Articles What Do You Plan to Buy for an Energy Tax Credit or Rebate in 2010? Energy Savers in the Community: Fuel Cell Vehicle Pioneer A home energy audit...

455

DOE and HUD Announce Lenders to Participate in New Pilot Program...  

Office of Environmental Management (EM)

of insulation, duct sealing, replacement doors and windows, HVAC systems, water heaters, solar panels, and geothermal systems. U.S. Housing and Urban Development (HUD) Secretary...

456

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

Centrifugal _ Screw Fuel type Heat rejection type Number of units Capacity (tons for each) VSD compressor

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

457

Pickliq{reg_sign} Process Pilot Program. Quarterly report, 2nd quarter 1997  

SciTech Connect (OSTI)

Work on the funded project was completed during this period. The final report will be issued within the next week. The Pickliq{reg_sign} Process has been found to be economically viable in the copper industry and is expected to be viable in steel-hydrochloric acid applications with the development of a new hydrochloric acid regeneration process associated with the Pickliq{reg_sign} Process.

NONE

1997-07-22T23:59:59.000Z

458

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

welded together like sewer pipe. Biogas production from theintends to convert the biogas into electricity. The wasteproduce 7.6 million Btu of biogas annually. This estimate

Case, C.W.

2011-01-01T23:59:59.000Z

459

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

shouldberevised. 9. Measurement and verification. continue measurement and verification(M&V)effortsNetwork M&VMeasurementandVerification Modbus?a

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

460

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

NV-21, Pyramid Lake Solar Assisted Fish Hatchery NV-64.Award~ PYRAMID LAKE SOLAR ASSISTED FISH HATCHERY Applicant

Case, C.W.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

Target Hayward Software client Automated Logic TargetAntioch Automated Logic Target Bakersfield Software client

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

462

CVICU A.C.E. Pilot Program Nursing Role with CPT  

E-Print Network [OSTI]

. Bubbles 3. Deep breathing & coughing 3. Incentive spirometer 4. Positioning 4. Deep breathing & coughing 5't evaluate-- Excessive Thick bronchial secretions swallows ~ough Strong, spontaneous Strong cough with ~eak spontaneous cough Absent cough &lor stimulation only ~th stimulation only mechanical support Weak spontaneous

Kay, Mark A.

463

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

Air Temperature ?VFD: Variable Frequency Drive Site namedecrease, variable frequency drive (VFD) limit,Temperature,VFD:VariableFrequencyDrive,CHW:Chilled

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

464

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

pitch _ No control Supply air temperature TemperatureControl Data Trending Detail InterAct=Yes EMCS Trends=Yes Submeter=Yes Circulation loop, room and air supply temperatures

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

465

San Diego Hero Alliance: Community-Based Social Marketing Pilot Program  

Broader source: Energy.gov [DOE]

Presents an overview of the California Center for Sustainable Energy's community-based social marketing strategies to promote home energy upgrades to San Diego military and veteran homeowners

466

Weatherization and Intergovernmental Program: Tribal Energy Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: Tribal Energy Program to someone by E-mail Share Weatherization and Intergovernmental Program: Tribal Energy Program on Facebook Tweet about Weatherization and Intergovernmental Program: Tribal Energy Program on Twitter Bookmark Weatherization and Intergovernmental Program: Tribal Energy Program on Google Bookmark Weatherization and Intergovernmental Program: Tribal Energy Program on Delicious Rank Weatherization and Intergovernmental Program: Tribal Energy Program on Digg Find More places to share Weatherization and Intergovernmental Program: Tribal Energy Program on AddThis.com... Plans, Implementation, & Results Weatherization Assistance Program

467

SECO Programs  

E-Print Network [OSTI]

maximum of $50,000 per grant ? Funded on a reimbursement basis Renewable Energy Technology Grants ? Fort Worth ISD ? South Sills High School ? 5KW Wind Turbine Alternative Fuel Grants ? Grant program to convert city/county and ISD vehicle... fleets to alternative fuels and hybrid- electric vehicles ? Competitive equipment grant program ? Maximum grant per vehicle - $5,000 ? Maximum total grant per applicant - $50,000 ? Funded on a reimbursement basis The LoanSTAR Revolving Loan Program...

Trevino, E.

2011-01-01T23:59:59.000Z

468

Pilot plant for CO2 capture with aqueous piperazine/potassium carbonate , Gary T. Rochelle1  

E-Print Network [OSTI]

GHGT-8 1 Pilot plant for CO2 capture with aqueous piperazine/potassium carbonate Eric Chen1 , Gary pilot for CO2 capture was successfully operated using potassium carbonate promoted with piperazine, potassium carbonate, piperazine Introduction Several amine-promoted potassium carbonate solvents have been

Rochelle, Gary T.

469

Sustainable Tourism Indicators: Pilot Estimation for the Municipality of Hersonissos, Crete.  

E-Print Network [OSTI]

Sustainable Tourism Indicators: Pilot Estimation for the Municipality of Hersonissos, Crete. Yianna@iacm.forth.gr Abstract The topic of the present research is the pilot estimation of sustainable tourism indicators of economic activity. In tourism, the concept of sustainability has been initially established as a notion

Zaferatos, Nicholas C.

470

Institute for Renewable Energy Ltd Preparation of a pilot biogas CHP plant integrated with  

E-Print Network [OSTI]

Institute for Renewable Energy Ltd Poland 1 Preparation of a pilot biogas CHP plant integrated on the preparation phase for a pilot investment in Koczala, Northern Poland, relating to an agricultural biogas CHP production and utilisation of agricultural biogas the project focused on BAT obtainable from various European

471

Pilot test of steam with additives at Midway-Sunset field, California  

SciTech Connect (OSTI)

This work graphically illustrates the results of a pilot test by the CLD Group Inc., Santa Fe Energy, Conoco, Texaco, and the U.S. Department of Energy. The purpose of the pilot test was to improve efficiency of steam drive enhanced oil recovery with blocking foams in the Midway-Sunset field of California.

Hammershaimb, E.C.

1982-01-01T23:59:59.000Z

472

American Institute of Aeronautics and Astronautics Coupled Flight Dynamics and CFD Analysis of Pilot  

E-Print Network [OSTI]

of the ship airwake on the rotorcraft as well as the effect of the rotorcraft on the ship airwake can of Pilot Workload in Ship Airwakes Derek O. Bridges,1 Joseph F. Horn,2 Emre Alpman,3 and Lyle N. Long4 of the helicopter/ship dynamic interface, in which pilot workload is examined using a novel coupling of flight

473

Ris-R-Report Pilot test and optimization of plasma based  

E-Print Network [OSTI]

of plasma based NOx reduction; · Optimise the ozone production using plasma discharges at atmosphericRisø-R-Report Pilot test and optimization of plasma based deNOx Eugen Stamate, Weifeng Chen Michelsen Title: Pilot test and optimization of plasma based NOx reduction Division: Plasma Physics

474

Self-Optimization of Antenna Tilt and Pilot Power for Dedicated Channels  

E-Print Network [OSTI]

Self-Optimization of Antenna Tilt and Pilot Power for Dedicated Channels Abstract-- In Radio Access Networks (RAN), fixed configurations result in poor network efficiency. This sub- optimal performance present a framework for a self-optimizing RAN, which adapts Antenna Tilt and Pilot Power according

Paris-Sud XI, Université de

475

HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT  

SciTech Connect (OSTI)

The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

HERTING DL

2008-09-16T23:59:59.000Z

476

Program Evaluation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation: Background and Methods Evaluation: Background and Methods Definition of evaluation: the process of determining the worth or merit of something; if "something" is a program, then it's "program evaluation." Other types of evaluation include: product evaluation (most widely practiced, e.g., Consumer Reports); personnel evaluation; research evaluation; policy studies; art, movie, play, and book reviews. Program evaluation is NOT the same as research although they share many characteristics--Both: Start with questions Use similar methods Provide similar information Program evaluation focuses on decisions. Research focuses on answering questions about phenomena to discover new knowledge and test theories/hypotheses. Research is aimed at truth. Evaluation is aimed at

477

Program Description  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Description Program Description SAGE, the Summer of Applied Geophysical Experience, is a unique educational program designed to introduce students in geophysics and related fields to "hands on" geophysical exploration and research. The program emphasizes both teaching of field methods and research related to basic science and a variety of applied problems. SAGE is hosted by the National Security Education Center and the Earth and Environmental Sciences Division of the Los Alamos National Laboratory. * teaches modern geophysical exploration techniques: seismic reflection and refraction, gravity and magnetics, electromagnetics (including magnetotellurics), and electrical resistivity * involves extensive hands-on field experience * integrates geophysical methods to solve real

478

Counterintelligence Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes Counterintelligence Program requirements and responsibilities for the Department of Energy, including the National Nuclear Security Administration. Cancels: DOE 5670.3.

2004-12-10T23:59:59.000Z

479

Program Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

In practice, organization is fluid, highly matrixed; scientists work in multiple areas - Ad hoc Task Forces form to address specific problems or issues * Experimental Program...

480

Counterintelligence Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the policies, procedures, and specific responsibilities for the Department of Energy (DOE) Counterintelligence (CI) Program. This directive does not cancel any other directive.

1992-09-04T23:59:59.000Z

Note: This page contains sample records for the topic "opt-in pilot program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Programming Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses plans for the acquisition and installation of operating environment hardware and software and design of a training program.

1997-05-21T23:59:59.000Z

482

tentative program  

E-Print Network [OSTI]

Sep 28, 2014 ... with Jon Brown, Gabriel Nagy, Aidan Sims, and Dana Williams. David Fisher Groups acting on Manifolds: Around the Zimmer Program.

2014-09-19T23:59:59.000Z

483

LWRS Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

What's New Archive Light Water Reactor Sustainability Program Accomplishments Report: 2013 An accomplishments report highlighting progress in the development of the scientific...

484

Sampling and Analysis Instruction for Installation of UPR-100-N-17 Bioremediation Wells and Performance of Bioventing Pilot Tests  

SciTech Connect (OSTI)

Sampling and analytical requirements for in situ bioremediation pilot study for remediation of vadose zone petroleum hydrocarbon contamination.

W. S. Thompson

2008-12-30T23:59:59.000Z

485

Receiver subsystem analysis report (RADL Item 4-1). 10-MWe Solar Thermal Central-Receiver Pilot Plant: solar-facilities design integration  

SciTech Connect (OSTI)

The results are presented of those thermal hydraulic, structural, and stress analyses required to demonstrate that the Receiver design for the Barstow Solar Pilot Plant will satisfy the general design and performance requirements during the plant's design life. Recommendations resulting from those analyses and supporting test programs are presented regarding operation of the receiver. The analyses are limited to receiver subsystem major structural parts (primary tower, receiver unit core support structure), pressure parts (absorber panels, feedwater, condensate and steam piping/components, flash tank, and steam mainfold) and shielding. (LEW)

Not Available

1982-04-01T23:59:59.000Z

486

New Metallization Technique Suitable for 6-MW Pilot Production of Efficient Multicrystalline Solar Cells Using Upgraded Metallurgical Silicon: Final Technical Progress Report, December 17, 2007-- June 16, 2009  

Broader source: Energy.gov [DOE]

This report describes CaliSolar's work as a Photovoltaic Technology Incubator awardee within the U.S. Department of Energy's Solar Energy Technologies Program. The term of this subcontract with the National Renewable Energy Laboratory was two years. During this time, CaliSolar evolved from a handful of employees to over 100 scientists, engineers, technicians, and operators. On the technical side, the company transitioned from a proof-of-concept through pilot-scale to large-scale industrial production. A fully automated 60-megawatt manufacturing line was commissioned in Sunnyvale, California. The facility converts upgraded metallurgical-grade silicon feedstock to ingots, wafers, and high-efficiency multicrystalline solar cells.

487

Solar LED Light Pilot Project Illuminates the Way in Alabama | Department  

Broader source: Energy.gov (indexed) [DOE]

LED Light Pilot Project Illuminates the Way in Alabama LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama September 12, 2012 - 2:15pm Addthis Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Tertia Speiser Project Officer, Golden Field Office "I want to invite everyone to come to Boaz and see the future of responsible highway lighting and power generation." -Boaz Mayor Tim Walker

488

A Report to the Secretary of Energy, Beyond Design Basis Event Pilot Evaluations  

Broader source: Energy.gov (indexed) [DOE]

Beyond Design Basis Event Beyond Design Basis Event Pilot Evaluations Results and Recommendations for Improvements to Enhance Nuclear Safety at Department of Energy Nuclear Facilities Office of Nuclear Safety Office of Health, Safety and Security U.S. Department of Energy January 2013 Beyond Design Basis Event Pilot Evaluations TABLE OF CONTENTS Executive Summary i Acronyms iv 1.0 Introduction and Purpose 1 2.0 Background 2 3.0 Pilot Evaluations of Safety Analysis, NPH, and Emergency Management Guidance 2 4.0 Insights Gained from NRC and the Nuclear Community 11 5.0 Summary of Results and Recommendations 12 6.0 Conclusions 14 Appendix A - Pilot Evaluation Team Members 15 Beyond Design Basis Event Pilot Evaluations * i

489

hydrogen pilot plant, H2ICE vehicle testing INL alternative energy vehicles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen Pilot Plant, H2ICE Hydrogen Pilot Plant, H2ICE Vehicle Testing, & INL Alternative Energy Vehicles (Advanced Vehicle Testing Activity) Jim Francfort Discovery Center of Idaho - September 2005 INL/CON-05-00694 AVTA Presentation Outline * Arizona Public Service's Alternative Fuel (Hydrogen) Pilot Plant Design and Operations * Hydrogen internal combustion engine vehicle testing * Oil bypass filter system evaluation * Diesel engine idling testing * INL alternative fuel infrastructure * INL alternative fuel fleet * WWW information APS Alternative Fuel (Alt-Fuel) Pilot Plant - Partners * Arizona Public Service (APS) * Electric Transportation Applications (ETA) * Idaho National Laboratory (INL) * Started operations - 2002 Alt-Fuel Pilot Plant & Vehicle Testing - Objectives * Evaluate the safety & reliability of operating ICE

490

Biochemical Conversion Pilot Plant (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biochemical Conversion Biochemical Conversion Pilot Plant A pilot-scale conversion plant for researchers, industry partners, and stakeholders to test a variety of biochemical conversion processes and technologies. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. In the biochemical conversion pilot plant, NREL's engineers and scientists focus on all aspects of the efficiency and cost reduction of biochemical conversion processes. Our capabilities accommodate research from bench-scale to pilot-scale (up to one ton per day). NREL's biochemical conversion pilot plant is located in the Integrated Biorefinery Research Facility (IBRF). Photo by Dennis Schroeder, NREL/PIX 20248

491

Solar LED Light Pilot Project Illuminates the Way in Alabama | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama September 12, 2012 - 2:15pm Addthis Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Tertia Speiser Project Officer, Golden Field Office "I want to invite everyone to come to Boaz and see the future of responsible highway lighting and power generation." -Boaz Mayor Tim Walker

492

Pilot study dismantlement of 20 lead-lined shipping casks  

SciTech Connect (OSTI)

This report describes a pilot study conducted at the INEL to dismantle lead-lined casks and shielding devices, separate the radiologically contaminated and hazardous materials, and recycle resultant scrap lead. The facility areas where the work was performed, dismantlement methods, and process equipment are described. Issues and results associated with recycling the lead as a free-released scrap metal are presented and discussed. Data and results from the pilot study are summarized and presented. The study concluded that cask dismantlement at the INEL can be performed as a legitimate recycling activity for scrap lead. Ninety-one percent of the lead recovered passed free-release criteria. The value of the 50,375 lb of recovered lead is approximately $0.45/lb. Resultant waste streams can be satisfactorily treated and disposed. Only very low levels of bulk radiological contamination (47 picocuries/gram of 137 Cs and 3.2 picocuries/gram of {sup 6O}Co) were detected in the lead rejected for free release.

Thurmond, S.M.

1995-08-01T23:59:59.000Z

493

Hydrostatic and shear consolidation tests with permeability measurements on Waste Isolation Pilot Plant crushed salt  

SciTech Connect (OSTI)

Crushed natural rock salt is a primary candidate for use as backfill and barrier material at the Waste Isolation Pilot Plant (WIPP) and therefore Sandia National Laboratories (SNL) has been pursuing a laboratory program designed to quantify its consolidation properties and permeability. Variables that influence consolidation rate that have been examined include stress state and moisture content. The experimental results presented in this report complement existing studies and work in progress conducted by SNL. The experiments described in this report were designed to (1) measure permeabilities of consolidated specimens of crushed salt, (2) determine the influence of brine saturation on consolidation under hydrostatic loads, and 3) measure the effects of small applied shear stresses on consolidation properties. The laboratory effort consisted of 18 individual tests: three permeability tests conducted on specimens that had been consolidated at Sandia, six hydrostatic consolidation and permeability tests conducted on specimens of brine-saturated crushed WIPP salt, and nine shear consolidation and permeability tests performed on crushed WIPP salt specimens containing 3 percent brine by weight. For hydrostatic consolidation tests, pressures ranged from 1.72 MPa to 6.90 MPa. For the shear consolidation tests, confining pressures were between 3.45 MPa and 6.90 MPa and applied axial stress differences were between 0.69 and 4.14 MPa. All tests were run under drained conditions at 25{degrees}C.

Brodsky, N.S. [RE/SPEC, Inc., Rapid City, SD (United States)

1994-03-01T23:59:59.000Z

494

Paso del Norte pilot border study of ozone precursors and air toxics  

SciTech Connect (OSTI)

A comprehensive monitoring program for ozone precursors and air toxics in the Paso del Norte border area is planned by the U.S. EPA for the Summer of 1996. A pilot study was carried out in October 1995 in the Paso del Norte area (El Paso, Texas, Ciudad Juarez, Chihuahua, and Sunland Park, New Mexico) to test the appropriateness of proposed sampling and analysis methods and to provide preliminary data to be used for planning the Summer 1996 study. Two monitoring sites were selected, one in Ciudad Juarez, and one in the El Paso area. Samples were collected every second day from October 21 to October 31, from 0300 to 0900 hr using stainless steel canisters (for VOC in the C{sub 2}-C{sub 12} range), Tenax-TA solid adsorbent cartridges (for C{sub 8}-C{sub 20} hydrocarbons). DNPH impregnated C{sub 18} Sep-Pack cartridges (for carbonyl compounds) and Teflon impregnated glass fiber filters followed by PUF/YAD/PUF {open_quotes}sandwich{close_quotes} cartridges (for SVOC). This paper discusses the data set obtained from the analyses of these samples. 6 refs., 7 figs.

Zielinska, B.; Sheetz, L.; Harshfield, G. [Desert Research Institute, Reno, NV (United States)] [and others

1996-12-31T23:59:59.000Z