Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

2

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992  

SciTech Connect

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-06-01T23:59:59.000Z

3

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

SciTech Connect

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

4

DOE/KEURP site operator program. Year 3, Second Quarter Report, October 1--December 31, 1993  

SciTech Connect

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU has purchased several electric cars and proposes to purchase additional electric vehicles. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has procured two (2) Soleq 1993 Ford EVcort station wagons. During calendar year 1994, the Kansas` electric vehicle program expects to purchase a minimum of four and a maximum of eleven additional electric vehicles. The G-Van was signed in order for the public to be aware that it was an electric vehicle. Financial participants` names have been stenciled on the back door of the van. The Soleq EvCorts have not been signed. In order to demonstrate the technology as feasible, the EvCorts were deliberately not signed. The goal is to generate a public perception that this vehicle is no different from any similar internal combustion engine vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged.

Not Available

1993-12-31T23:59:59.000Z

5

NNSA's Stockpile Stewardship Program Quarterly Experiments summary...  

National Nuclear Security Administration (NNSA)

science-based stockpile stewardship program is now available here. The quarterly summary prepared by NNSA's Office of Defense Programs provides descriptions of key NNSA facilities...

6

NNSA's Stockpile Stewardship Program Quarterly Experiments summary...  

National Nuclear Security Administration (NNSA)

Science-Based Stockpile Stewardship Program is now available here. The quarterly summary prepared by NNSA's Office of Defense Programs provides descriptions of key NNSA facilities...

7

Program Update: 4th Quarter 2010  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

8

Program Update: 1st Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

9

Program Update: 2nd Quarter 2010  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

10

Program Update: 4th Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

11

Program Update: 3rd Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

12

NNSA Defense Programs Announces Quarterly Awards | National Nuclear...  

National Nuclear Security Administration (NNSA)

NNSA Production Office NPO News Releases NNSA Defense Programs Announces Quarterly Awards NNSA Defense Programs Announces Quarterly Awards applicationmsword icon NR-02-16.doc...

13

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

feraci.pdf More Documents & Publications Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May...

14

Quarterly Biomass Program/Clean Cities States Web Conference...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Presentation from the...

15

Calorimetry exchange program quarterly data report, fourth quarter CY92  

SciTech Connect

The goals of the Calorimetry Sample Exchange Program are: (1) discuss measurement differences (2) review and improve analytical measurements and methods (3) discuss new measurement capabilities (4) provide data to DOE on measurement capabilities to evaluate shipper- receiver differences (5) provide characterized or standard materials as necessary for exchange participants (6) provide a measurement control program for plutonium analysis A sample Of PUO2 powder is available at each participating site for NDA measurement, including either or both calorimetry and high-resolution gamma-ray spectroscopy, the elements which are typically combined to provide a calorimetric assay of plutonium. The facilities measure the sample as frequently and to the level of precision which they desire, and then submit the data to the Exchange for analysis. The data report includes summary tables for each measurement and charts showing the performance of each laboratory. Comparisons are made to the accepted values for the exchange sample and to data previously reported by that laboratory. This information is presented, in the form of quarterly reports as this document provides and as annual reports, intended for use by Exchange participants in measurement control programs, or to indicate when bias corrections may be appropriate. No attempt, however, has been made to standardize methods or frequency of data collection, calibration, or operating procedures. Direct comparisons between laboratories may, therefore, be misleading since data have not been collected to the same precision or for the same time periods. A meeting of the participants of the Calorimetry Exchange is held annually at EG&G Mound Applied Technologies. The purposes of this meeting are to discuss measurement differences, problems, and new measurement capabilities, and to determine the additional activities needed to fulfill the goals of the Exchange.

Barnett, T.M.

1992-12-31T23:59:59.000Z

16

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Presentation from May 6, 2010...

17

Federal Technical Capability Program - Quarterly Performance Indicator  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Performance Indicator Reports Quarterly Performance Indicator Reports 2013 Quarterly Report on Federal Technical Capability August 16, 2013 Quarterly Report on Federal Technical Capability June 5, 2013 Quarterly Report on Federal Technical Capability February 20, 2013 2012 Quarterly Report on Federal Technical Capability November 20, 2012 Quarterly Report on Federal Technical Capability August 8, 2012 Quarterly Report on Federal Technical Capability May 30, 2012 Quarterly Report on Federal Technical Capability March 6, 2012 2011 Quarterly Report on Federal Technical Capability November 10, 2011 Quarterly Report on Federal Technical Capability August 24, 2011 Quarterly Report on Federal Technical Capability May 18, 2011 Quarterly Report on Federal Technical Capability February 23, 2011

18

Environmental Biosciences Program Quarterly Report  

SciTech Connect

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making.

Lawrence C. Mohr, M.D.

2008-01-31T23:59:59.000Z

19

Environmental Biosciences Program Quarterly Report  

SciTech Connect

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.

Lawrence C. Mohr, M.D.

2007-07-31T23:59:59.000Z

20

Wind Program R&D Newsletter: Fourth Quarter 2013  

Energy.gov (U.S. Department of Energy (DOE))

This archived U.S. Department of Energy Wind Program R&D Newsletter provides information about the program's research and development projects, its accomplishments, and funding opportunities from the fourth quarter of 2013.

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Program Update: 3rd Quarter 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3rd Quarter 2010 3rd Quarter 2010 Program Update: 3rd Quarter 2010 Inside this Update: Public Access Established for the Dr. Modesto Iriarte Technological Museum in Rincόn, Puerto Rico; Draft LM Strategic Plan Available for Review; Legacy Management Business Center Awarded Second Energy-Efficiency Award; LM Assumes Responsibility for Yucca Mountain Records and Information; Natural Gas Sampling at the Gasbuggy, New Mexico; Rio Blanco and Rulison, Colorado; Nuclear Gas Sites; Students from Native American Environmental Youth Camp Tour Tuba City, Arizona, Site; 2010 Long-Term Surveillance and Maintenance Conference, and more. Office of Legacy Management (LM) Program Update, July-September 2010 More Documents & Publications Program Update: 3rd Quarter 2011 Program Update: 3rd Quarter 2012

22

The Savannah River Site's Groundwater Monitoring Program, third quarter 1991  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

Not Available

1992-02-17T23:59:59.000Z

23

Program Update: 4th Quarter 2013 | Department of Energy  

Office of Environmental Management (EM)

Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS;...

24

Program Update: 1st Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1st Quarter 2013 1st Quarter 2013 Program Update: 1st Quarter 2013 Inside this Update: Abandoned Uranium Mines Report to Congress: LM Wants Your Input; LM Discusses Management of LTS&M Records; LM Launches New Website Under energy.gov; Biological Monitoring at Amchitka Appears to Show Impacts from Fukushima Dai-ichi Incident; Completion of the CERCLA Natural Resource Damage Process at the Rocky Flats Site; Environmental Justice Activities; Mound Museum Volunteers: Preserving a Laboratory's Legacy; DOE Evaluates Environmental Impacts of Uranium Mining on Government Land in Western Colorado; Solar Photovoltaic System at Tuba City Site; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during

25

Program Update: 3rd Quarter 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Program Update: 3rd Quarter 2010 Inside this Update: Public Access Established for the Dr. Modesto Iriarte Technological Museum in Rincόn, Puerto Rico; Draft LM Strategic Plan Available for Review; Legacy Management Business Center Awarded Second Energy-Efficiency Award; LM Assumes Responsibility for Yucca Mountain Records and Information; Natural Gas Sampling at the Gasbuggy, New Mexico; Rio Blanco and Rulison, Colorado; Nuclear Gas Sites; Students from Native American Environmental Youth Camp Tour Tuba City, Arizona, Site; 2010 Long-Term Surveillance and Maintenance Conference, and more. Office of Legacy Management (LM) Program Update, July-September 2010 More Documents & Publications Program Update: 3rd Quarter 2011 Program Update: 3rd Quarter 2013

26

Program Update: 4th Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Program Update: 4th Quarter 2013 Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS; Groundwater Remedy Is Evaluated at the Mound, Ohio, Site; Visitors Learn About the History of LM's Unique Facility in Puerto Rico; German Remediation Offi cials Benchmarking Visit; International Atomic Energy Agency Accepts Consultation from LM; Environmental Justice Activities; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time Office of Legacy Management (LM) Program Update, October-December 2013 More Documents & Publications

27

Program Update: 3rd Quarter 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Program Update: 3rd Quarter 2012 Inside this Update: LM Co-Hosts International Workshop on Uranium Legacy Sites; LM Communication and Stakeholder Satisfaction Independent Survey; LM Conducts Groundwater and Soil Investigation at Riverton, Wyoming, in Response to 2010 Flood; LM's First Year with the Title X Uranium/Thorium Reimbursement Program; DOE and Colorado Mesa University Education Agreement Expands LM's Site Reuse Portfolio; Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during

28

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 for the Carbon Tetrachloride system was completed in 2010. ** EDB has only been detected in the influent at trace and Recirculate Tritium 4 Operate- 9 Standby- 7 100% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC

29

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby-

30

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 100% 1 1063

31

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 Standby NA

32

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 30% NA 1062

33

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

34

Automotive Stirling Engine Development Program. Quarterly technical progress report for period June 29-October 3, 1980  

SciTech Connect

Current information on component and subsystems development activities and engine and vehicle testing during July to October 1980 in the Automotive Stirling Engine Development Program is reported. Computer code development progress is also covered. The status of the manufacture of the Mod I is given in some detail. Program engine operating hours through the end of this quarterly period reach a total of 6181 h.

Not Available

1980-12-01T23:59:59.000Z

35

The Savannah River Site's Groundwater Monitoring Program, second quarter 1990  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

Not Available

1991-02-07T23:59:59.000Z

36

The Savannah River Site's Groundwater Monitoring Program, second quarter 1989  

SciTech Connect

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

37

Energy programs. Quarterly report, January-March 1980  

SciTech Connect

The Johns Hopkins University Applied Physics Laboratory, is engaged in developing energy resource, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the US Naval Air Station, Norfolk, Va.

Not Available

1980-01-01T23:59:59.000Z

38

Field Operations Program  

NLE Websites -- All DOE Office Websites (Extended Search)

688 688 May 1999 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort D. V. O'Hara L. A. Slezak DOE/ID-10688 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort 1 D. V. O'Hara 2 L. A. Slezak 2 Published May 1999 Idaho National Engineering and Environmental Laboratory Automotive Systems and Technology Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Idaho Operations Office 1 INEEL/Lockheed Martin Idaho Technologies Co. 2 U.S. Department of Energy iii EXECUTIVE SUMMARY The Field Operations Program is an electric vehicle testing and evaluation program sponsored by U.S. Department of Energy and managed by the Idaho National Engineering and Environmental

39

Operations Security Program  

Directives, Delegations, and Requirements

To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

1992-04-30T23:59:59.000Z

40

Corporate Operating Experience Program  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Program Update: 1st Quarter 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Program Update: 1st Quarter 2012 Inside this Update: Interagency Working Group Collaborates on Codisposal of Uranium Mine and Mill Tailings Waste in New Mexico; Atomic Energy of Canada Limited Benchmarking Visit to the LMBC; LM Creates Cooperative Agreement with the Northern Arapaho Tribe; LM Participates in 2012 WM Conference; M Partners with Diné Environmental Institute on Remediation of Uranium Processing Sites; LM Stakeholder Survey 2012 Update; LM: LEEDing the Way; Yucca Mountain Transition Progress - Congressional Interest; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time. Office of Legacy Management (LM) Program Update, January-March 2012

42

Program Update: 2nd Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Program Update: 2nd Quarter 2013 Inside this Update: Blue Star Memorial By-Way Dedication: Weldon Spring Interpretive Center; LM Progressing with Uranium Mines Report to Congress; Next Generation (NextGen) Geospatial Information System (GIS); State and Tribal Government Working Group Visits the Fernald Preserve; Lakeview GCAP Acceptance; LM Support Services Contract Extended; Release of American Burying Beetles at the Fernald Preserve; Electronic Equipment Donated to Elementary Schools on Hopi Reservation; Environmental Justice Activities; LM Welcomes New Employees; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time. Office of Legacy Management (LM) Program Update, April-June 2013

43

Wind Program Newsletter: Second Quarter 2013  

Energy.gov (U.S. Department of Energy (DOE))

This archived edition of the U.S. Department of Energy Wind Program R&D Newsletter, which was published on July 1, 2013, provides information about the program's research and development projects, its accomplishments, and funding opportunities.

44

Wind Program Newsletter: Second Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

This archived edition of the U.S. Department of Energy Wind Program R&D Newsletter, which was published on May 20, 2011, provides information about the program's research and development projects, its accomplishments, and funding opportunities.

45

Program Update: 3rd Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Program Update: 3rd Quarter 2013 Inside this Update: Legacy Management Work Progresses on Defense-Related Uranium Mines Report to Congress; Weaving Community and Science; LM Completes Construction of Well Pad at CNTA; DOE Salute - Grand Junction, Colorado, Business Incubator of the Year; Replacement of Rocky Flats Water Monitoring Flume; LM Data Safer than Ever with FM-200; LM Security Guard Saves a Life; Fernald Preserve Mini-BioBlitzs; Mound Site Property Transfer; Flag Raising Ceremony at Grand Junction Office; Injection of Soybean Oil at Pinellas Site; Support Contractor Receives VPP Award; Environmental Justice Activities; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during

46

Wind Program Newsletter: Third Quarter 2012  

Energy.gov (U.S. Department of Energy (DOE))

In less than two years, the Wind Program is well on its way down the path laid out by the National Offshore Wind Strategy. In 2011, U.S. Department of Energy (DOE) announced 41 projects in the...

47

Operations and Maintenance Program Structure  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

48

Advanced turbine systems program conceptual design and product development. Quarterly report, February 1995--April 1995  

SciTech Connect

This Quarterly Technical Progress Report covers the period February 1, 1995, through April 30, 1995, for Phase II of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE contract No. DE-AC21-93MC30246. The objective of Phase II of the ATS Program is to provide the conceptual design and product development plan for an ultra high efficiency, environmentally superior and cost competitive industrial gas turbine system to be commercialized by the year 2000. A secondary objective is to begin early development of technologies critical to the success of ATS. Tasks 1, 2, 3, 5, 6 and 7 of Phase II have been completed in prior quarters. Their results have been discussed in the applicable quarterly reports and in their respective topical reports. With the exception of Task 7, final editions of these topical reports have been submitted to the DOE. This quarterly report, then, addresses only Task 4 and the nine subtasks included in Task 8, {open_quotes}Design and Test of Critical Components.{close_quotes} These nine subtasks address six ATS technologies as follows: (1) Catalytic Combustion - Subtasks 8.2 and 8.5, (2) Recuperator - Subtasks 8.1 and 8.7, (3) Autothermal Fuel Reformer - Subtask 8.3, (4) High Temperature Turbine Disc - Subtask 8.4, (5) Advanced Control System (MMI) - Subtask 8.6, and (6) Ceramic Materials - Subtasks 8.8 and 8.9. Major technological achievements from Task 8 efforts during the quarter are as follows: (1) The subscale catalytic combustion rig in Subtask 8.2 is operating consistently at 3 ppmv of NO{sub x} over a range of ATS operating conditions. (2) The spray cast process used to produce the rim section of the high temperature turbine disc of Subtask 8.4 offers additional and unplanned spin-off opportunities for low cost manufacture of certain gas turbine parts.

Karstensen, K.W.

1995-07-01T23:59:59.000Z

49

The Savannah River Site's Groundwater Monitoring Program: Second quarter 1992  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1992 are listed in this report.

Rogers, C.D. (Westinghouse Savannah River Co., Aiken, SC (United States))

1992-10-07T23:59:59.000Z

50

The Savannah River Site's Groundwater Monitoring Program: Fourth quarter 1991  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

Rogers, C.D. (Westinghouse Savannah River Co., Aiken, SC (United States))

1992-06-02T23:59:59.000Z

51

Second Quarter Report Environmental Biosciences Program  

SciTech Connect

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific program, employing a range of research initiatives to identify, study and resolve environmental health risk issues. These initiatives are consistent with the Medical University's role as a comprehensive state-supported health sciences institution and the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable the Medical University to be a national resource for the scientific investigation of environmental health issues. EBP's success in convening worldwide scientific expertise is due in part to the inherent credibility the Medical University brings to the process of addressing these complex issues.

Lawrence C. Mohr, M.D.

2002-10-31T23:59:59.000Z

52

1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"The Facility Representative Program Performance Indicators (PIs) Quarterly Report is attached, covering the period from January 2000 to March 2000. Data for these indicators are gathered by the...

53

4Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"The Facility Representative Program Performance Indicators Quarterly Report is attached, covering the period from October to December 2000. Data for these indicators are gathered by the Field...

54

2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2005. Data for these indicators are gathered by Field elements...

55

4Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

Attached is the Facility Representative Program Performance Indicators (Pis) Quarterly Report Covering the Period from October to December 2002. Data for these indicators are gathered by Field...

56

3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July through September 2011. Data for these indicators were gathered...

57

1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from January to March 2003. Data for these indicators are gathered by Field...

58

4Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October through December 2011. Data for these indicators were...

59

3Q C&2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2008. Data for these indicators aregathered by Field...

60

1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were...

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July to September 2002. Data for these indicators are gathered by the Field...

62

2Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from April to June 2002. Data for these indicators are gathered by the Field...

63

1Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January to March 2002. Data for these indicators are gathered by the Field...

64

3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these...

65

The Savannah River Site Groundwater Monitoring Program Fourth Quarter 2000 (October thru December 2000)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by SRS during fourth quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program.

Dukes, M.D.

2001-08-02T23:59:59.000Z

66

Quarterly Program Progress Report April 1, 2002-June 30, 2002  

SciTech Connect

DOE B188 DOE/PHRI Special Medical Care Program in the Republic of the Marshall Islands (RMI)Quarterly Program Progress Report The DOE/PHRI Special Medical Care Program continues to provide, on a year round basis, a broad spectrum of medical care to the DOE patient population. During the fourth quarter of Year 4, the following medical services were provided: (1) Annual medical examinations for the DOE patient population (see Exhibit 1 for details). (2) Medications for the DOE patient population. (3) Preventive and primary medical care to the DOE patient population in the RMI as time and resources permit. (4) Additional manpower for the outpatient clinics at Ebeye and Majuro Hospitals (see Exhibit 2 for details). (5) Ancillary services such as labs, radiology and pharmacy in coordination with Kwajalein Hospital, Majuro Hospital and the 177 Health Care Program (177 HCP). (6) Referrals to Ebeye Hospital, Majuro Hospital and Kwajalein Hospital as necessary. (7) Referrals to Straub Clinic and Hospital in Honolulu as necessary (for details see Exhibit 1). (8) Monitored and adjusted monthly annual examination schedules based on equipment failure at Kwajalein. In addition to the above, the program was also involved in the following activities during this quarter: (1) Organized and conducted continuing medical education (CME) talks for the program's RMI staff and other RMI healthcare workers. (2) Held meetings with RMI government officials and Local Atoll government officials. (3) Input past medical records into the Electronic Medical Record (EMR) system. (4) Made adjustments to and created more templates for the EMR system. (5) Coordinated with the Public Health Departments on Majuro and Ebeye. (6) Met with PEACESAT to discuss possible collaboration on high speed Internet access. (7) Looked for opportunities to expand the program's telehealth capabilities. (8) Participated in the DOE-RMI Meeting in Honolulu. (9) Finalized the agreement with the RMI Ministry of Health and Environment (MOHE) and Majuro Hospital to hire Dr. Marie Lanwi on a part-time basis. (10) Held a Community Advisory Group (CAG) Meeting and Community Meeting on Majuro. (11) Negotiated with Kwajalein with regards to the increase in laboratory and procedure costs and continuing Mammography services for the DOE patient population. (12) Met with DOE in Honolulu to discuss the next year's program and budget. (13) Trained new residents in the use of the electronic medical record system. (14) Conducted electronic medical record audits. (15) Participated in a training session for the appointment scheduler module by Physician Micro System, Inc. on the EMR system. (16) Worked on the Year 5 Continuation Application and Budget. (17) Finalized the Memorandum of Understanding (MOU) with 177. (18) Worked with DOE and Bechtel Nevada (BN) to reduce PHRI program costs to meet an increase in referral costs paid by Bechtel. This report details the additions and changes to the program for the April 1, 2002-June 30, 2002 period.

Palafox, Neal A., MD, MPH

2002-07-31T23:59:59.000Z

67

F&I Quarterly Program Update (October 27, 2009) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F&I Quarterly Program Update (October 27, 2009) F&I Quarterly Program Update (October 27, 2009) F&I Quarterly Program Update (October 27, 2009) Agenda OMB 4th Quarterly Goals Review Whitepaper on Real Property Right-Sizing and Carbon Footprint Reduction F&I QPR 1st Quarter Deliverables FY 2010 FIMS Data Validation FY 2010 FIMS Data Validation Schedule FY 2010 FIMS and RPAM Training Schedule 2009 Dispositions E.O. 13514, Federal Leadership in Environmental, Energy, and Economic Performance Annual Deferred Maintenance Report Bridge Inspection Follow-up Bridge Inspection Requirements Space Planning Findings, Where We are ... Where We Need to Go FIMS Occupant Data Tools - Population Due Crosswalk of RPAM and Energy Order Schedule for Getting RPAM Revision Signed out by S2 Brief on LED Lighting How to Obtain an iPortal Account

68

The Savannah River site`s groundwater monitoring program: second quarter 1997  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

Rogers, C.D. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1997-11-01T23:59:59.000Z

69

The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

Not Available

1992-02-17T23:59:59.000Z

70

Environmental Hazards Assessment Program quarterly report, January--March 1995  

SciTech Connect

The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are to: develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter (January--March) of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan published at the end of the first year of the grant. Questions, comments, or requests for further information concerning the activities under this grant can be forwarded to Jack Davis in the EHAP office of the Medical University of South Carolina at (803) 727-6450.

NONE

1995-04-30T23:59:59.000Z

71

Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: First Quarter 1999  

SciTech Connect

The Environmental Science and Research Foundation conducts an Offsite Environmental Surveillance Program at the US Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the first quarter 1999 is based on 564 samples of air (including airborne radioactivity, fine particulates, and atmospheric moisture), precipitation, milk, and wild game tissues. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radiation, worldwide fallout from past nuclear weapons ! testing, an d nuclear operations around the world. No measured concentrations could be directly attributed to operations at the INEEL. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

R. Evans

1999-09-01T23:59:59.000Z

72

Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: Third Quarter 1999  

SciTech Connect

The Environmental Science and Research Foundation conducts an offsite environmental surveillance program for the Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the third quarter of 1999 is based on 704 samples of air, fine particulates, atmospheric moisture, precipitation, milk, and food. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radiation, worldwide fallout from past nuclear weapons testing, and nuclear operations around the world. No! measured concentrations could be directly attributed to operations at the INEEL. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

R. Evans

2000-03-01T23:59:59.000Z

73

Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: Fourth Quarter 1998  

SciTech Connect

The Environmental Science and Research Foundation conducts the Offsite Environmental Surveillance Program at the US Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the fourth quarter 1998 is based on 622 samples collected of air, fine particulates, atmospheric moisture, precipitation, water, milk, potatoes, and game animals. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radioactivity, worldwide fallout from past nuclear weapons testing, an! d nuclear operations around the world. No measured concentrations could be directly attributed to operations at the INEEL, although statistical differences did exist between on-site and distant gross beta concentrations. No evidence could be found to link these differences with a specific INEEL source. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

T. Saffle; R. Evans

1999-08-01T23:59:59.000Z

74

Idaho National Engineering and Environmental Laboratory Offsite Environmental Surveillance Program Report: Second Quarter 1999  

SciTech Connect

The Environmental Science and Research Foundation conducts an Offsite Environmental Surveillance Program at the US Department of Energy's Idaho National Engineering and Environmental Laboratory (INEEL). The Foundation's environmental surveillance program monitors the effects, if any, of US Department of Energy (DOE) activities on the offsite environment, collects data to confirm compliance with applicable environmental laws and regulations, and observes any trends in the environmental levels of radioactivity. This report for the second quarter 1999 is based on 618 samples of air (including airborne radioactivity, fine particulates, and atmospheric moisture), precipitation, milk, drinking water, sheep, wild game tissues, and environmental radiation. All concentrations of radioactivity found in these samples were consistent with concentrations which have been found in sampling during recent quarters and which have been attributed in the past to natural background radiation, worldwide fallout from past nuclear weapons testing, and nuclear operations around the world. No measured concentrations could be directly attributed to operations at the INEEL. Concentrations in all samples were below the guidelines set by both the DOE and the US Environmental Protection Agency (EPA) for protection of the public.

R. Evans

1999-12-01T23:59:59.000Z

75

Wind Program Newsletter: Third Quarter 2011 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Newsletter: Third Quarter 2011 Department of Energy Awards 43 Million to Spur Offshore Wind Energy In the News Current R&D Funding Opportunities Recent Publications...

76

DOE Corporate Operating Experience Program  

Directives, Delegations, and Requirements

The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Cancels DOE O 210.2.

2011-04-08T23:59:59.000Z

77

The Savannah River Site`s groundwater monitoring program. First quarter 1991  

SciTech Connect

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

Not Available

1991-10-18T23:59:59.000Z

78

The Savannah River Site`s Groundwater Monitoring Program, First Quarter 1996, Volumes I and II  

SciTech Connect

This report summarizes the Savanna River Site (SRS) Groundwater Monitoring Program conducted by EPD/EMS during the first quarter 1996. It includes the analytical data, field data, data review, quality control, and other documentation for this program. It also provides a record of the program`s activities and serves as an official record of the analytical results.

Rogers, C.D. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1996-10-22T23:59:59.000Z

79

The Savannah River Site`s Groundwater Monitoring Program. First quarter 1992  

SciTech Connect

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

Not Available

1992-08-03T23:59:59.000Z

80

Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, October-December 1980  

SciTech Connect

The Johns Hopkins University Applied Physics Laboratory is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 December 1980. The Energy Quarterly Report is divided into five sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/RA), contains a report on institutional problems for small-scale hydroelectric power development in the southeastern states and a list of documents published by APL in the hydroelectric program and in the geothermal program, above. The third section, Seismotectonic Investigations, contains an article on work on the geologic structure of the Danbury Quadrangle that is supported by the Reactor Safety Research Division of the Nuclear Regulatory Commission (NRC) and an in-house supported study on a new method for assessing earthquakes in intraplate regions. The fourth section, Energy Conversion and Storage Techniques, contains four articles. The first is an evaluation of the Einstein refrigerator, supported by independent IR and D funds. The second concerns fly-wheel technology development at APL supported by the Department of Energy, Division of Energy Storage (DOE/STOR). The third is a report on APL energy conservation efforts at its own buildings, and the fourth is an article on liquefied natural gas (LNG) safety evaluation, supported by the National Academy of Sciences. The fifth section explores the value of establishing an Energy Research Institute at The Johns Hopkins University.

None

1980-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

82

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

83

Protection Program Operations  

Directives, Delegations, and Requirements

This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

2014-10-14T23:59:59.000Z

84

The Savannah River Site's Groundwater Monitoring Program Second Quarter 2000 (April through June 2000)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by SRS during second quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Dukes, M.D.

2001-04-17T23:59:59.000Z

85

The Savannah River Site's Groundwater Monitoring Program First Quarter 2000 (January through March 2000)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by SRS during first quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Dukes, M.

2000-11-16T23:59:59.000Z

86

The Savannah River Site's Groundwater Monitoring Program - Third Quarter 1999 (July through September 1999)  

SciTech Connect

This report summarizes the Savannah River Site Groundwater Monitoring Program during the third quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program activities; and serves as an official record of the analytical results.

Hutchison, J.B.

2000-09-05T23:59:59.000Z

87

The Savannah River Site's Groundwater Monitoring Program - Second Quarter 1998 (April through June 1998)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by SRS during second quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for the program; provides a record of the program's activities; and serves as an official record of the analytical results.

Hutchison, J B

1999-02-10T23:59:59.000Z

88

The Savannah River Site's Groundwater Monitoring Program - Fourth Quarter 1999 (October through December 1999)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by the Savannah River site during fourth quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official records of the analytical results.

Hutchison, J.B.

2000-10-12T23:59:59.000Z

89

The Savannah River Site's Groundwater Monitoring Program First Quarter 1998 (January through March 1998)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by the Savannah River Site during first quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Hutchison, J.B.

1999-05-26T23:59:59.000Z

90

The Savannah River Site's Groundwater Monitoring Program second quarter 1999 (April through June 1999)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Hutchison, J.B.

1999-12-16T23:59:59.000Z

91

The Savannah River Site's Groundwater Monitoring Program Third Quarter 2000 (July through September 2000)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by SRS during third quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Dukes, M.D.

2001-05-02T23:59:59.000Z

92

The Savannah River Site's Groundwater Monitoring Program First Quarter 1999 (January through March 1999)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Hutchison, J.B.

1999-12-08T23:59:59.000Z

93

The Savannah River Site's Groundwater Monitoring Program Third Quarter 1998 (July through September 1998)  

SciTech Connect

This report summarizes the Groundwater Monitoring Program conducted by SRS during third quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

Hutchison, J.B.

1999-05-10T23:59:59.000Z

94

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

95

The Savannah River Site`s Groundwater Monitoring Program: Third quarter 1992  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. Table 1 lists those well series with constituents in the groundwater above Flag 2 during third quarter 1992, organized by location. Results from all laboratory analyses are used to generate this table. Specific conductance and pH data from the field also are included in this table.

Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1993-02-04T23:59:59.000Z

96

Protection Program Operations  

Directives, Delegations, and Requirements

The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Cancels DOE M 470.4-2A, DOE M 470.4-3A, and DOE M 470.4-8. Appendix C Safeguards and Security Alarm Management and Control Systems, of DOE M 470.4-2A, is retained and incorporated into this Order as Attachment 3, Annex 1.

2011-06-29T23:59:59.000Z

97

FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report  

SciTech Connect

This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-10-01T23:59:59.000Z

98

DOE Corporate Operating Experience Program  

Directives, Delegations, and Requirements

The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

2006-06-12T23:59:59.000Z

99

Electric Vehicle Site Operator Program  

SciTech Connect

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-01-01T23:59:59.000Z

100

Reactor Safety Research Programs Quarterly Report October - December 1981  

SciTech Connect

This document summarizes the work performed by Pacific Northwest laboratory (PNL) from October 1 through December 31, 1981, for the Division of Accident Evaluation, U.S. Nuclear Regulatory Commission (NRC). Evaluations of nondestructive examination (NDE) techniques and instrumentation are reported; areas of investigation include demonstrating the feasibility of determining the strength of structural graphite, evaluating the feasibility of detecting and analyzing flaw growth in reactor pressure boundary systems, examining NDE reliability and probabilistic fracture mechanics, and assessing the integrity of pressurized water reactor (PWR) steam generator tubes where serviceinduced degradation has been indicated. Experimental data and analytical models are being provided to aid in decision-making regarding pipe-to-pipe impacts following postulated breaks in high-energy fluid system piping. Core thermal models are being developed to provide better digital codes to compute the behavior of full-scale reactor systems under postulated accident conditions. Fuel assemblies and analytical support are being provided for experimental programs at other facilities. These programs include loss-of-coolant accident (LOCA) simulation tests at the NRU reactor, Chalk River, Canada; fuel rod deformation, severe fuel damage, and post accident coolability tests for the ESSOR reactor Super Sara Test Program, lspra, Italy; the instrumented fuel assembly irradiation program at Halden, Norway; and experimental programs at the Power Burst Facility, Idaho National Engineering Laboratory (INEL), Idaho Falls, Idaho. These programs will provide data for computer modeling of reactor system and fuel performance during various abnormal operating conditions.

Edler, S. K.

1982-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Quarterly Progress Report  

Energy.gov (U.S. Department of Energy (DOE))

Quarterly Progress Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

102

The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1992  

SciTech Connect

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the fourth quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities; and serves as an official document of the analytical results.

Not Available

1993-05-17T23:59:59.000Z

103

The Savannah River Site`s Groundwater Monitoring Program: First quarter 1993, Volume 1  

SciTech Connect

This report summarizes the Savannah River Site (SRS) Groundwater Monitoring Program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the first quarter of 1993. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1993-08-01T23:59:59.000Z

104

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

105

Quarterly report on the Ferrocyanide Safety Program for the period ending September 30, 1995  

SciTech Connect

This is the eighteenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 2.0 through 4.0.

Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

1995-10-01T23:59:59.000Z

106

Efficiency Vermont's Enhanced Building Operations Programs  

E-Print Network (OSTI)

1 Efficiency Vermont?s Enhanced Building Operations Programs 11th International Conference for Enhanced Building Operations Session 4: Regional Utility Programs for Operational Improvement New York City - October 19, 2011 2 Topics... for Discussion ? Introduction: Efficiency Vermont ? Efficiency Vermont?s Whole-Building Operational Improvement Programs & Pilot Programs ?Commissioning & Retro-commissioning Programs ?Re-tuning Pilot Program ?Re-tuning Pilot Program Variations ?Other...

Laflamme, S.

2011-01-01T23:59:59.000Z

107

Auditing of Programs and Operations  

Directives, Delegations, and Requirements

To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Cancels DOE O 224.2.

2007-11-09T23:59:59.000Z

108

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

larson.pdf More Documents & Publications Renewable Fuel Standards Program Update EISA 2007: Focus on Renewable Fuels Standard Program...

109

Distinguished Achievements of a Quarter-Century Operation and a Promising Project Named MK-III in JOYO  

SciTech Connect

The experimental fast reactor JOYO at the O-arai Engineering Center of the Japan Nuclear Cycle Development Institute is the first liquid sodium fast reactor in Japan. The purpose of constructing JOYO was to obtain technical information about liquid-metal fast breeder reactors (LMFBRs) through experience with their design, construction, and operation and to use the reactor as a fast neutron irradiation facility for the development of fuels, materials, and other components required for the LMFBR program. Through design, construction, testing, operation, and maintenance experience, JOYO has contributed much to the LMFBR development program. In addition to providing operating experience, many kinds of irradiation tests have been conducted for the development of fuels and materials under the conditions of higher fast neutron flux and temperature than those in light water reactors. JOYO has been operated successfully for a quarter-century without any serious problem, and this operation demonstrated the safety and reliability of the sodium-cooled fast reactor.The reactor has just been upgraded to the MK-III core to increase irradiation capability for playing a greater role in providing an irradiation field as a fast reactor. Given the worldwide trend of fast reactor shutdowns, JOYO is an increasingly valuable world resource for current and future reactor development.

Maeda, Yukimoto; Aoyama, Takafumi; Odo, Toshihiro; Nakai, Satoru; Suzuki, Soju [Japan Nuclear Cycle Development Institute (Japan)

2005-04-15T23:59:59.000Z

110

Program, Course or Contract Title: Energy Systems & Climate Change Quarter and Academic Year: Fall 2009  

E-Print Network (OSTI)

workshops with hands-on statistical methods for data presentation. Our primary texts for energy and climate Initiative. Our primary texts for policy were Global Environmental Governance by Speth & Haas, Who OwnsProgram, Course or Contract Title: Energy Systems & Climate Change Quarter and Academic Year: Fall

111

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January 1-March 31, 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

112

The Savannah River Site`s Groundwater Monitoring Program, second quarter 1990  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

Not Available

1991-02-07T23:59:59.000Z

113

The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989  

SciTech Connect

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-12-31T23:59:59.000Z

114

The Savannah River Site`s Groundwater Monitoring Program, second quarter 1989  

SciTech Connect

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-12-31T23:59:59.000Z

115

Program Update: 3rd Quarter 2009 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

occurred across the DOE complex during that period of time. Office of Legacy Management (LM) Program Update, July-September 2009 More Documents & Publications Program Update: 2nd...

116

Short-rotation woody-crops program. Quarterly progress report for period ending August 31, 1981  

SciTech Connect

Progress of twenty-one projects in the Short Rotation Woody Crops Program is summarized for the period June 1 through August 31, 1981. Individual quarterly reports included from each of the projects discuss accomplishments within specific project objectives and identify recent papers and publications resulting from the research. The major program activities are species screening and genetic selection, stand establishment and cultural treatment, and harvest, collection, transportation, and storage.

Cushman, J.H.; Ranney, J.W.

1982-04-01T23:59:59.000Z

117

Letter from the Wind Program Director: Fourth Quarter 2013 |...  

Energy Savers (EERE)

A program-funded project at the University of Maine became the first grid connected offshore wind turbine in the United States. The program also launched its newest initiative,...

118

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Fuel Standard Program (RFS-2) May 6, 2010 2 Key Changes Required by EISA Energy Independence and Security Act (EISA, December 2007) required changes to the RFS program...

119

Ferrocyanide Safety Program. Quarterly report for the period ending March 31, 1994  

SciTech Connect

Various high-level radioactive waste from defense operations has accumulated at the Hanford Site in underground storage tanks since the mid-1940s. During the 1950s, additional tank storage space was required to support the defense mission. To obtain this additional storage volume within a short time period, and to minimize the need for constructing additional storage tanks, Hanford Site scientists developed a process to scavenge {sup 137}Cs from tank waste liquids. In implementing this process, approximately 140 metric tons of ferrocyanide were added to waste that was later routed to some Hanford Site single-shell tanks. The reactive nature of ferrocyanide in the presence of an oxidizer has been known for decades, but the conditions under which the compound can undergo endothermic and exothermic reactions have not been thoroughly studied. Because the scavenging process precipitated ferrocyanide from solutions containing nitrate and nitrite, an intimate mixture of ferrocyanides and nitrates and/or nitrites is likely to exist in some regions of the ferrocyanide tanks. This quarterly report provides a status of the activities underway at the Hanford Site on the Ferrocyanide Safety Issue, as requested by the Defense Nuclear Facilities Safety Board (DNFSB) in their Recommendation 90-7. A revised Ferrocyanide Safety Program Plan addressing the total Ferrocyanide Safety Program, including the six parts of DNFSB Recommendation 90-7, was recently prepared and released in March 1994. Activities in the revised program plan are underway or have been completed, and the status of each is described in Section 4.0 of this report.

Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

1994-04-01T23:59:59.000Z

120

Nuclear Safety Research and Development Program Operating Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating...

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM  

E-Print Network (OSTI)

CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM A six-week in-depth program in the architectures, infrastructure, and operations of Cloud Computing DePaul University's Cloud Computing Infrastructure and Operations Program provides specialized knowledge in Cloud infrastructure with emphasis

Schaefer, Marcus

122

Wind Program Newsletter: First Quarter 2012 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Turbines in U.S. Waters Will Soon Spin Wind into Electricity DOE releases Offshore Demonstration Project Solicitation The U.S. Department of Energy Wind Program is...

123

Short-rotation woody-crops program. Quarterly progress report for period ending May 31, 1981  

SciTech Connect

Progress of twenty projects in the Short Rotation Woody Crops Program is summarized for the period March 1 through May 31, 1981. Individual quarterly reports included from each of the projects discuss accomplishments within specific project objectives and identify recent papers and publications resulting from the research. The major project activities are species screening and genetic selection, stand establishment and cultural treatment, and harvest, collection, transportation, and storage.

Cushman, J.H.; Ranney, J.W.

1982-04-01T23:59:59.000Z

124

Letter from the Wind Program Director, Third Quarter 2013 edition...  

Energy Savers (EERE)

5, 2014 - 11:27am Addthis Head and shoulder photograph of Jose Zayas In this year's offshore wind edition of the Wind Program Newsletter, the U.S. Department of Energy (DOE) and...

125

Wind Program Newsletter: Second Quarter 2012 | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

with Wind Program staff. More. In the News Energy Department Releases New Land-BasedOffshore Wind Resource Map Wind Powering America's Wind for Schools Team Honored with Wirth...

126

Northeast regional biomass program. First quarter report, October--December 1993  

SciTech Connect

This progress report presents summaries of various projects which were in operation or being planned during this quarter period. Projects included testing the efficiency of using wood chips as fuel in heating systems, barriers to commercial development of wood pellet fuels, studies of more efficient and less polluting wood stoves, work on landfill gas utilization, directories of facilities using biomass fuels, surveys of biomass conversion processes to liquid fuels, for commercial development, etc.

NONE

1994-05-01T23:59:59.000Z

127

Environmental Hazards Assessment Program. Quarterly report, July--September 1993  

SciTech Connect

The objectives of the EHAP program stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication which recognizes the direct impact of environmental hazards on the health and well-being of all, (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management.

Not Available

1993-12-01T23:59:59.000Z

128

Operational Demonstration Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Demonstration Program Operational Demonstration Program Operational Demonstration Program < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Buying & Making Electricity Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Water Heating Wind Maximum Rebate $500,000 Program Info Funding Source CEFIA Start Date 2005 State Connecticut Program Type Industry Recruitment/Support Rebate Amount $150,000 - $500,000 Provider Clean Energy Finance and Investment Authority This program is currently closed. Applications were due in February 2012.

129

The Savannah River Site`s Groundwater Monitoring Program: Second quarter 1992  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1992 are listed in this report.

Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1992-10-07T23:59:59.000Z

130

The Savannah River Site`s Groundwater Monitoring Program. Second quarter, 1991  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

Not Available

1992-01-10T23:59:59.000Z

131

The Savannah River Site`s Groundwater Monitoring Program: Fourth quarter 1991  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1992-06-02T23:59:59.000Z

132

The Savannah River Site`s Groundwater Monitoring Program. First quarter, 1990  

SciTech Connect

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program`s activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1990-10-18T23:59:59.000Z

133

Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1994-01-01T23:59:59.000Z

134

Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1993-10-01T23:59:59.000Z

135

Saudi Aramco Gas Operations Energy Efficiency Program  

E-Print Network (OSTI)

Saudi Aramco Gas Operations (GO) created energy efficiency strategies for its 5-year business plan (2011-2015), supported by a unique energy efficiency program, to reduce GO energy intensity by 26% by 2015. The program generated an energy savings...

Al-Dossary, F. S.

2012-01-01T23:59:59.000Z

136

Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1980  

SciTech Connect

The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government and an agency of the State of Maryland, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/DGE), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, supported by the Reactor Safety Research Division of the Nuclear Regulatory Commission, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the U.S. Naval Air Station, Norfolk, Va. This work is supported by the Department of Energy and the Department of Defense, Naval Facilities Engineering Command/Atlantic Division.

Entingh, Daniel J.

1980-03-01T23:59:59.000Z

137

High temperature packing test program. First quarterly technical progress report, October 1-December 26, 1981  

SciTech Connect

The program was undertaken to improve the technical understanding of the performance of plunger packings in coal liquefaction pilot plant feed pumps. During the first quarter of FY 1982, visits were made to the H-Coal, EDS and SRC-I pilot plants, where technical discussions were held with maintenance and engineering personnel, and the maintenance records and work orders for the plunger pumps were reviewed. Technical discussions were held with engineering personnel at the manufacturing facilities of three plunger pump manufacturers' companies. Contracts and technical discussions with packing vendors were initiated. Design of the laboratory tests was started.

Not Available

1982-02-12T23:59:59.000Z

138

Field Operations Program Activities Status Report  

SciTech Connect

The Field Operations Program is an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed by the Idaho National Engineering and Environmental Laboratory. The Program's goals are to evaluate electric vehicles in real-world applications and environments, support electric vehicle technology advancement, develop infrastructure elements necessary to support significant electric vehicle use, support increased use of electric vehicles in federal fleets, and increase overall awareness and acceptance of electric vehicles. This report covers Program activities from fiscal year 1997 through mid-fiscal year 1999. The Field Operations Program succeeded the Site Operator Program, which ended in September 1996. Electric vehicle testing conducted by the Program includes baseline performance testing (EV America testing), accelerated reliability (life-cycle) testing, and fleet testing. The baseline performance parameters include accelerations, braking, range, energy efficiency, and charging time. The Program collects accelerated reliability and fleet operations data on electric vehicles operated by the Program's Qualified Vehicle Testing (QVT) partners. The Program's QVT partners have over 3 million miles of electric vehicle operating experience.

J. E. Francfort; D. V. O'Hara; L. A. Slezak

1999-05-01T23:59:59.000Z

139

Operations and Maintenance Program Measurement  

Energy.gov (U.S. Department of Energy (DOE))

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

140

Overview of the Third Quarter 2014 Surveillance and Maintenance...  

Office of Legacy Management (LM)

8 8 Third Quarter 2014 Groundwater Monitoring and Operations RFLMA Monitoring Light sampling quarter * 10 RCRA wells (quarterly) Statistical evaluation of results...

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

Not Available

1994-04-01T23:59:59.000Z

142

The Savannah River Site`s groundwater monitoring program. Third quarter 1990  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

Not Available

1991-05-06T23:59:59.000Z

143

Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

NONE

1995-07-01T23:59:59.000Z

144

Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

NONE

1995-04-01T23:59:59.000Z

145

Nuclear Power 2010 Program: Combined Construction and Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design...

146

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

147

Employer Handbook Co-operative Education Program  

E-Print Network (OSTI)

1 Employer Handbook Co-operative Education Program Faculty of Arts University of Calgary #12. This handbook is your guide to the Co-op process at the University of Calgary and should ensure a rewarding management resources Provide connections to Career Services on campus The physical location and mailing

Habib, Ayman

148

Federal Energy Management Program: Operations and Maintenance Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

149

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

150

Operating and Assurance Program Plan. Revision 4  

SciTech Connect

The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

Not Available

1994-07-01T23:59:59.000Z

151

Cooperative research program in coal liquefaction. Quarterly report, August 1, 1991--October 31, 1991  

SciTech Connect

This Quarterly Report on coal liquefaction research includes discussion in the areas of (1) Iron Based Catalysts for Coal Liquefaction; (2) Exploratory Research on Coal Conversion; (3) Novel Coal Liquefaction Concepts; (4) Novel Catalysts for Coal Liquefaction. (VC)

Huffman, G.P. [ed.

1991-12-31T23:59:59.000Z

152

Operations and Maintenance Program Structure | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Structure Operations and Maintenance Program Structure Operations and Maintenance Program Structure October 4, 2013 - 5:12pm Addthis The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and administration. This approach is commonly referred to as the OMETA principle. Common roles and responsibilities for each function within the OMETA principle are outlined below. Operations The operations function of the O&M program covers the following responsibilities: Administration: Responsible for ensuring effective implementation and control of O&M activities Conduct of Operations: Responsible for ensuring efficient, safe, and reliable process operations across the O&M program

153

Microsoft Word - 201205_2012-OPSPLAN-Goal3-Survey-QuarterlyRpt.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FTCP Quarterly Report FTCP Quarterly Report Survey to Determine if the FTCP Quarterly Report Continues to Fulfill a Useful Function FTCP Agents Review and Feedback The survey below is designed to solicit: 1) input and feedback on effectiveness of current practices, and 2) recommended strategies and approaches to continuously improve the FTCP's ability in meetings its objectives with the FTCP Quarterly Report recipients' (Program Secretarial Officers, Site Managers). This survey is responsive to the Federal Technical Capability Program FY 2012 Operational Plan, Goal 3, "in improving FTCP management processes" Background: This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Programs (TQPs) and technical skill

154

Operating Experience Level 3, Importance of Conduct of Operations and Training for Effective Criticality Safety Programs  

Energy.gov (U.S. Department of Energy (DOE))

OE-3 2012-07: Importance of Conduct of Operations and Training for Effective Criticality Safety Programs

155

STANFORD GEOTHERMAL QUARTERLY REPORT  

E-Print Network (OSTI)

STANFORD GEOTHERMAL PROGRAM QUARTERLY REPORT OCTOBER 1 ­ DECEMBER 31, 1996 #12;1 1 AN EXPERIMENTAL that in the vertical case. 1.2 INTRODUCTION The process of boiling in porous media is of significance in geothermal

Stanford University

156

STANFORD GEOTHERMAL QUARTERLY REPORT  

E-Print Network (OSTI)

1 STANFORD GEOTHERMAL PROGRAM QUARTERLY REPORT JANUARY 1 - MARCH 31, 1997 #12;2 1 AN EXPERIMENTAL in geothermal systems as well as in many other applications such as porous heat pipes, drying and nuclear waste

Stanford University

157

Nuclear Safety Research and Development Program Operating Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Operating Plan Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating plan outlines the mission, goals, and processes for the Department of Energy's (DOE) Nuclear Safety Research & Development (NSR&D) Program. This first version of the operating plan also discusses the startup phase of the program. NSR&D involves a systematic search for knowledge to advance the fundamental understanding of nuclear safety science and technology through scientific study, analysis, modeling, and experiments. Maintaining an effective NSR&D program will support DOE and the National Nuclear Security Administration (NNSA) in standards development, validation of analytical models and

158

Federal Energy Management Program: Operations and Maintenance for Major  

NLE Websites -- All DOE Office Websites (Extended Search)

for Major Equipment Types to someone by E-mail for Major Equipment Types to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Google Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Delicious Rank Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

159

FTCP Quarterly Indicator Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assistance » Federal Technical Capability Program » Assistance » Federal Technical Capability Program » FTCP Quarterly Indicator Reports FTCP Quarterly Indicator Reports November 20, 2013 FTCP Quarterly Report on Federal Technical Capability, November 20, 2013 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls. August 16, 2013 FTCP Quarterly Report on Federal Technical Capability, August 16, 2013 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis.

160

ERHAN KUTANOGLU Graduate Program in Operations Research and Industrial Engineering  

E-Print Network (OSTI)

ERHAN KUTANOGLU Graduate Program in Operations Research and Industrial Engineering Department · As a tenured faculty member in the Operations Research and Industrial Engineering Graduate Program, develop School of Engineering Co-Director, Industrial Affiliates Program January 2012 ­ Present Advanced

Kutanoglu, Erhan

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

PEPCO - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Commissioning: 50% of cost Enhanced Commissioning: $20,000 Energy Savings Study Incentive: $20,000 All Incentives: $250,000/account/year for custom, prescriptive, commissioning and O&M Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $12,000 or $0.06/sq. ft.

162

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report October 1-December 31, 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

163

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report January 1-March 31, 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

164

Operations Training Program Status Report 1/28/99  

E-Print Network (OSTI)

Operations Training Program Status Report 1/28/99 Michael Spata Operations Deputy Group Leader Following is a description of the various aspects of the Operations Group Training program. While most for providing on-the-job training in accelerator specific topics. The mentor will also be able to certify

165

Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1981  

SciTech Connect

The Johns Hopkins University Applied Laboratory, under contracts with several agencies of the federal government, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1981. The Energy Quarterly Report is divided into three sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Siting of Critical Facilities, supported by the Nuclear Regulatory Commission (NRC) and in-house funds, contains reports on geologic investigations in western Connecticut and areas in adjacent New York, development of seismotectonic domains, and fracture permeability in siting hazardous waste repositories. The third section, Energy Conservation and Storage Techniques, supported by the Argonne National Laboratory (ANL), reports on institutional barriers to landfill methane recovery and the need for state legislation.

None

1981-03-01T23:59:59.000Z

166

Operations and Maintenance Program Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Management Program Management Operations and Maintenance Program Management October 4, 2013 - 5:11pm Addthis Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity. The following section outlines the major components of effective O&M management, including: Program Structure: Outlines five distinctive functions making up the O&M organization: Operations, Maintenance, Engineering, Training, and Administration (OMETA) Management Support: Details the importance of gaining management support to an effective O&M program, and how to gain that support Program Implementation: Provides an overview of implementing an effective O&M program and how to maintain that program into the future

167

3rd Quarter 2014 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

of ore per day)",2013,"1st quarter 2014","2nd quarter 2014","3rd quarter 2014" "EFR White Mesa LLC","White Mesa Mill","San Juan, Utah",2000,"Operating-Processing Alternate...

168

Operations Program Management (OPM) Homepage | U.S. DOE Office...  

Office of Science (SC) Website

Information Operations Program Management U.S. Department of Energy SC-33Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-8429 F: (301)...

169

Operations monitoring concept. Consolidated Fuel Reprocessing Program  

SciTech Connect

Operations monitoring is a safeguards concept which could be applied in future fuel cycle facilities to significantly enhance the effectiveness of an integrated safeguards system. In general, a variety of operations monitoring techniques could be developed for both international and domestic safeguards application. The goal of this presentation is to describe specific examples of operations monitoring techniques as may be applied in a fuel reprocessing facility. The operations monitoring concept involves monitoring certain in-plant equipment, personnel, and materials to detect conditions indicative of the diversion of nuclear material. An operations monitoring subsystem should be designed to monitor operations only to the extent necessary to achieve specified safeguards objectives; there is no intent to monitor all operations in the facility. The objectives of the operations monitoring subsystem include: verification of reported data; detection of undeclared uses of equipment; and alerting the inspector to potential diversion activities. 1 fig.

Kerr, H.T.

1985-01-01T23:59:59.000Z

170

Regulations of the Arkansas Operating Air Permit Program (Arkansas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) < Back Eligibility Commercial Construction Fuel Distributor Industrial Investor-Owned Utility Retail Supplier Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality The Regulations of the Arkansas Air Operating Program are adopted in accordance with the provisions of Part UU of the Arkansas Water and Air Pollution Control Act, Arkansas Code Annotated 8-4-101, and will be referred to in this description as "program", "regulations" and "regulation No. 26". The regulations are intended to meet the requirements of title of

171

Operations and Maintenance Program Measurement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement October 4, 2013 - 5:19pm Addthis Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a successful O&M program. O&M managers must think beyond reliability. Successful programs incorporate reliability along with controlling costs, evaluating and implementing new technologies, tracking and reporting health and safety issues, and more. Not only are these metrics useful in assessing effectiveness, but also in equipment cost justification, program modifications, and staff hiring. Common Metrics The following metrics are common in evaluating effective O&M programs. Not

172

Protection Program Operations - DOE Directives, Delegations,...  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations by jcronin Functional areas: Physical Protection, Protective Force, Safeguards, Security, and Emergency Management The Order establishes requirements for the...

173

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water Reactor Sustainability (LWRS) Program and EPRI's Long-Term Operations (LTO) Program. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a Memorandum of Understanding in late 2010 to "establish guiding principles under which research activities (between LWRS and LTO) could be

174

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water Reactor Sustainability (LWRS) Program and EPRI's Long-Term Operations (LTO) Program. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a Memorandum of Understanding in late 2010 to "establish guiding principles under which research activities (between LWRS and LTO) could be

175

Design and operation of internal dosimetry programs  

SciTech Connect

The proposed revision to USNRC 10 CFR 20 and the USDOE Order 5480.11 require intakes of radioactive material to be evaluated. Radiation dose limits are based on the sum of effective dose equivalent from intakes and the whole body dose from external sources. These significant changes in the regulations will require, at a minimum, a complete review of personnel monitoring programs to determine their adequacy. In this session we will review a systematic method of designing a routine personnel monitoring program that will comply with the requirements of the new regulations. Specific questions discussed are: (a) What are the goals and objectives of a routine personnel monitoring program (b) When is a routine personnel monitoring program required (c) What are the required capabilities of the routine personnel monitoring program (d) What should be done with the information generated in a personnel monitoring program Specific recommendations and interpretations are given in the session. 5 refs., 3 figs., 33 tabs.

LaBone, T.R.

1991-01-01T23:59:59.000Z

176

2014 Headquarters Facilities Master Security Plan- Chapter 8, Operations Security Program  

Energy.gov (U.S. Department of Energy (DOE))

2014 Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program Describes the DOE Headquarters Operations Security (OPSEC) Program.

177

Federal assistance program. Quarterly project progress report, January 1998--March 1998  

SciTech Connect

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-04-01T23:59:59.000Z

178

Training program requirements for remote equipment operators in nuclear facilities  

SciTech Connect

One of the most neglected areas in the engineering development of remotely operated equipment applications in nuclear environments is the planning of adequate training programs for the equipment operators. Remote equipment accidents cannot be prevented solely by engineered safety features on the equipment. As a result of the experiences in using remote equipment in the recovery effort at Three Mile Island Unit 2 (TMI-2), guidelines for the development of remote equipment operator training programs have been generated. The result is that a successful education and training program can create an environment favorable to the safe and effective implementation of a remote equipment program in a nuclear facility.

Palau, G.L.; Auclair, K.D.

1986-01-01T23:59:59.000Z

179

Operational Plan and Desktop Reference for the Veterans Employment Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Desktop Reference for the Veterans Employment Operational Plan and Desktop Reference for the Veterans Employment Program Operational Plan and Desktop Reference for the Veterans Employment Program DOE Guide to the President's Initiative for Veterans Employment. Includes: Department-wide policies and procedures, goals and objectives, DVAAP, information on veterans' preference and special hiring authorities, procedures for use of vocational rehabilitation programs, sources for finding veterans, and links to websites. Operational Plan and Desktop Reference for the Veterans Employment Program Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail donna.friend@hq.doe.dov Phone 202-586-5880 More Documents & Publications Operational Plan and Desktop Reference for the Disability Employment Program

180

Operational Plan and Desktop Reference for the Veterans Employment Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Desktop Reference for the Veterans Employment Operational Plan and Desktop Reference for the Veterans Employment Program Operational Plan and Desktop Reference for the Veterans Employment Program DOE Guide to the President's Initiative for Veterans Employment. Includes: Department-wide policies and procedures, goals and objectives, DVAAP, information on veterans' preference and special hiring authorities, procedures for use of vocational rehabilitation programs, sources for finding veterans, and links to websites. Operational Plan and Desktop Reference for the Veterans Employment Program Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail donna.friend@hq.doe.dov Phone 202-586-5880 More Documents & Publications Operational Plan and Desktop Reference for the Disability Employment Program

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Nuclear Safety Reserch and Development Program Operating Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Research and Development Safety Research and Development Program Operating Plan Office of Nuclear Safety Office of Health, Safety and Security U.S. Department of Energy June 2012 INTENTIONALLY BLANK NSR&D Program Operating Plan June 2012 Table of Contents 1.0 INTRODUCTION................................................................................................................. 1 2.0 BACKGROUND ................................................................................................................... 1 3.0 OBJECTIVES ....................................................................................................................... 2 4.0 NSR&D PROGRAM PROCESSES .................................................................................... 3

182

Rotational Programs General Electric Operations Management Leadership Program, Edison Engineering  

E-Print Network (OSTI)

://nestlepurinacareers.com/CollegeStudents/ManagementTraineeOpportunities.aspx Praxair Commercial Leadership Development Program http://www.praxair.com/praxair.nsf/0/0AC4813647AD

183

Advanced emissions control development program. Quarterly technical progress report No. 9, October 1--December 31, 1996  

SciTech Connect

Babcock & Wilcox (B&W) is conducting a five-year project aimed at the development of practical, cost-effective strategies for reducing the emissions of hazardous air pollutants (commonly called air toxics) from coal-fired electric utility plants. The need for air toxic emissions controls may arise as the U.S. Environmental Protection Agency proceeds with implementation of Title III of the Clean Air Act Amendment of 1990. Data generated during the program will provide utilities with the technical and economic information necessary to reliably evaluate various air toxics emission compliance options such as fuel switching, coal cleaning, and flue gas treatment. The development work is being carried out using B&W`s new Clean Environment Development Facility (CEDF) wherein air toxics emission control strategies can be developed under controlled conditions, and with proven predictability to commercial systems. Tests conducted in the CEDF provide high quality, repeatable, comparable data over a wide range of coal properties, operating conditions, and emissions control systems. Development work to date has concentrated on the capture of mercury, other trace metals, fine particulate, and the inorganic species hydrogen chloride and hydrogen fluoride.

Evans, A.P.

1996-12-31T23:59:59.000Z

184

Corporate Operating Experience Program | Department of Energy  

Office of Environmental Management (EM)

SORs published were in 2006 (Special Operations report 2006-1: Electical Safety, and Laser Safety Report, SOR 2005-01. These documents are now archived. For further information,...

185

Delmarva - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Retro-Commissioning: $30,000 Commissioning: 50% of cost Enhanced Commissioning: 20,000 All Incentives: 250,000/account/year and 500,000/customer for custom, prescriptive, commissioning and OandM Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $0.02/sq ft or $4,000 (Development); $0.06/sq ft or

186

Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4: July--September 1996  

SciTech Connect

This report presents significant accomplishments for the Oak Ridge Reservation`s environmental restoration projects for the fourth quarter of FY 1996.

NONE

1996-10-01T23:59:59.000Z

187

Geothermal drilling and completion technology development program. Quarterly progress report, April-June 1980  

SciTech Connect

The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are reported. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G.

1980-07-01T23:59:59.000Z

188

Geothermal drilling and completion technology development program. Quarterly progress report, October-December 1979  

SciTech Connect

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1980-01-01T23:59:59.000Z

189

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

190

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

191

Environment, Safety, and Health Program for Department of Energy Operations  

Directives, Delegations, and Requirements

To establish the Environment, Safety, and Health (ES&H) Program for Department of Energy (DOE) operations. Cancels DOE O 5480.1A. Canceled by DOE N 251.4.

1986-09-23T23:59:59.000Z

192

Environmental Protection, Safety, and Health Protection Program for DOE Operations  

Directives, Delegations, and Requirements

This Order establishes the Environmental Protection, Safety. and Health Protection Program for Department of Energy (DOE) operations. Cancels DOE 5480.1, dated 5-5-1980, its chapters are not canceled. Canceled by DOE O 5480.1B

1981-08-13T23:59:59.000Z

193

Environmental Protection, Safety, and Health Protection Program for DOE Operations  

Directives, Delegations, and Requirements

This order establishes the Environmental Protection, Safety, and Health Protection Program for Department of Energy (DOE) operations. Cancels Interim Management Directive No. 5001, Safety, Health And Environmental Protection dated 9-29-77.

1980-05-05T23:59:59.000Z

194

Program of 1998 KOTAC Operator Theory Conference  

E-Print Network (OSTI)

, Ireland) Eui-Chai Jeong (Chung-Ang University, Korea) I l Bong Jung (Kyungpook National University, Korea 10:10 -11:00 Muneo Cho On a relation of the Taylor spectrum and the Xia spectrum 11:10 -11:40 Eui-hyponormal operators 16:40-17:30 Eui-Chai Jeong A representation of a simple C*-algebra from wavelets June 30 (Tuesday

Lee, Woo Young

195

Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, January 1981-March 1981  

SciTech Connect

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods as they apply to advanced drilling systems.

Kelsey, J.R. (ed.)

1981-06-01T23:59:59.000Z

196

Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, October 1980-December 1980  

SciTech Connect

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development.

Kelsey, J.R. (ed.)

1981-03-01T23:59:59.000Z

197

Operations and Maintenance Program Implementation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Implementation Program Implementation Operations and Maintenance Program Implementation October 4, 2013 - 5:16pm Addthis Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies. While no universal plan exists, Federal Energy Management Program (FEMP) recommends the following common steps for implementing O&M programs: Start small: Choose a project that is manageable and can be completed in a short period of time (e.g., six months to one year) Select troubled equipment: Choose a project with visibility because of problematic equipment history Minimize risk: Choose a project that provides immediate and positive results; this project must be successful, so risk of failure should be

198

E-Print Network 3.0 - assistance program quarterly Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

at San Diego Collection: Engineering 3 Assembly and Testing of an On-Farm Manure to Energy Conversion BMP for Animal Waste Pollution Control Summary: Control FY07 CIG program...

199

The AMTEX Partnership. Second quarter report, Fiscal Year 1995  

SciTech Connect

The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby reserving and creating US jobs. The operations and program management of the AMTEX Partnership is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership.

Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

1995-03-01T23:59:59.000Z

200

LOA-1: prevent accidents. Quarterly technical progress report, FRSP program - July through September 1981. [LMFBR  

SciTech Connect

Information related to LMFBR reactor safety is presented concerning common cause failures; shutdown by self-activated system; shutdown heat removal system operation; sodium burning; core catcher material interactions; accident release of sodium oxide aerosol; and LMFBR risk assessment.

Not Available

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Lessons Learned Quarterly Report | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Lessons Learned Quarterly Report Lessons Learned Quarterly Report Lessons Learned Quarterly Report DOE's NEPA Lessons Learned Program was initiated in 1994 to foster continuous improvement in NEPA compliance by measuring DOE NEPA performance and gathering information learned through NEPA experience. The Program collects and publishes time and cost metrics to help DOE objectively focus on controlling these aspects of its NEPA compliance, and disseminates information broadly relevant to NEPA implementation, such guidance on public participation and interagency coordination procedures. The keystone of DOE's NEPA Lessons Learned Program is the Lessons Learned Quarterly Report (LLQR). The LLQR is produced as a means of disseminating NEPA program metrics, along with related guidance, case studies, analysis,

202

Rebuild America Program Brazos Valley Energy Conservation Coalition Quarterly Report for July September 1998  

E-Print Network (OSTI)

Bryan High School Bryan ISD 229,033 square feet Site Contact ESL Metering Contact Mr. Mike Kristynik Aamer Athar Executive Director 053 WERC Planning & Operations Texas A&M University 101 N. Texas Avenue College Station, TX 77843-3123 Bryan, TX 77803... Bryan ISD 108,443 square feet Site Contact Mr. Mike Kristynik Executive Director Planning & Operations 101 N. Texas Avenue Bryan, TX 77803 (409) 361-5200 ESL Metering Contact Aamer Athar 053 WERC Texas A&M University College Station, TX 77843-3123 (409...

Yazdani, B.; Haberl, J. S.; Turner, W. D.; Claridge, D. E.

1998-01-01T23:59:59.000Z

203

ASCeNews Quarterly Newsletter - September 2011 | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

September 2011 | National Nuclear Security September 2011 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog XYZ ASCeNews Quarterly Newsletter - September 2011 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASCeNews Quarterly

204

ASCeNews Quarterly Newsletter - March 2012 | National Nuclear Security  

National Nuclear Security Administration (NNSA)

March 2012 | National Nuclear Security March 2012 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Contact Puzzle ASCeNews Quarterly Newsletter - March 2012 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASCeNews Quarterly

205

ASCeNews Quarterly Newsletter - September 2011 | National Nuclear Security  

National Nuclear Security Administration (NNSA)

September 2011 | National Nuclear Security September 2011 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog XYZ ASCeNews Quarterly Newsletter - September 2011 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASCeNews Quarterly

206

Acid rain program: CEMS submission instructions for monitoring plans, certification test notifications, and quarterly reports  

SciTech Connect

The Acid Rain Program regulations require all affected utility units to continuously measure, record and report SO2, NOx, volumetric flow data and CO2 emissions. All affected units also must continuously measure and record opacity, and must report opacity exceedances to the appropriate State or Local Agency. To ensure that your CEMS and fuel flowmeters are performing at an acceptable level, and providing quality assured data, you are required under 40 CFR 75.53, 75.62 (a) to submit a monitoring plan and certification test data for acid rain CEM certificaton. The purpose of this handbook is to help you fulfill your requirements under the Acid Rain Program. This handbook will walk you through the necessary steps for gaining CEMS certification, including filling out and mailing the proper forms, administering the required tests, and applying for certification and sending in electronic data to EPA.

NONE

1995-05-12T23:59:59.000Z

207

The Savannah River Site`s Groundwater Monitoring Program. Second quarter 1994  

SciTech Connect

This document contains information concerning the groundwater monitoring program at Savannah River Plant. The EPD/EMS (environmental protection department/environmental monitoring section) is responsible for monitoring constituents in the groundwater at approximately 135 waste sites in 16 areas at SRS. This report consolidates information from field reports, laboratory analysis, and quality control. The groundwater in these areas has been contaminated with radioactive materials, organic compounds, and heavy metals.

Not Available

1994-11-01T23:59:59.000Z

208

Advanced turbine systems program conceptual design and product development: Quarterly report, November 1993--January 1994  

SciTech Connect

This report describes progress made in the advanced turbine systems program conceptual design and product development. The topics of the report include selection of the Allison GFATS, castcool technology development for industrial engines test plan and schedule, code development and background gathering phase for the ultra low NOx combustion technology task, active turbine clearance task, and water vapor/air mixture cooling of turbine vanes task.

NONE

1995-01-01T23:59:59.000Z

209

Northeast regional biomass program. Second & third quarterly reports, October 1, 1995--March 31, 1996  

SciTech Connect

The Northeast Regional Biomass Program (NRBP) is comprised of the following states: Connecticut. Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island and Vermont. It is managed for the Department of Energy (DOE) by the CONEG Policy Research Center, Inc. The Northeast states face several near-term barriers to the expanded use of biomass energy. Informational and technical barriers have impeded industrial conversions, delaying the development of a wood energy supply infrastructure. Concern over the environmental impacts on resources are not well understood. Public awareness and concern about safety issues surrounding wood energy use has also grown to the point of applying a brake to the trend of increases in residential applications of biomass energy. In addition, many residential, industrial, and commercial energy users are discouraged from using biomass energy because of the convenience factor. Regardless of the potential for cost savings, biomass energy sources, aside from being perceived as more esoteric, are also viewed as more work for the user. The Northeast Regional Biomass Program (NRBP) is designed to help the eleven Northeastern states overcome these obstacles and achieve their biomass energy potentials. The objective of this program in the current and future years is to increase the role of biomass fuels in the region`s energy mix by providing the impetus for states and the private sector to develop a viable Northeast biomass fuels market.

NONE

1996-07-01T23:59:59.000Z

210

Northeast Regional Biomass Program first and second quarter reports, October 1, 1994--March 31, 1995  

SciTech Connect

The Northeast states face several near-term barriers to the expanded use of biomass energy. Informational and technical barriers have impeded industrial conversions, delaying the development of a wood energy supply infrastructure. Concern over the environmental impacts on resources are not well understood. Public awareness and concern about safety issues surrounding wood energy use has also grown to the point of applying a brake to the trend of increases in residential applications of biomass energy. In addition, many residential commercial, industrial, and commercial energy users are discouraged from using biomass energy because of the convenience factor. Regardless of the potential for cost savings, biomass energy sources, aside from being perceived as more esoteric, are also viewed as more work for the user. The Northeast Regional biomass Program (NRBP) is designed to help the eleven Northeastern states overcome these obstacles and achieve their biomass energy potentials. The objective of this program in the current and future years is to increase the role of biomass fuels in the region`s energy mix by providing the impetus for states and the private sector to develop a viable Northeast biomass fuels market. This paper contains a management report, state program summaries, technical project status report, and technology transfer activities.

NONE

1995-07-01T23:59:59.000Z

211

Achieving High Reliability Operations Through Multi-Program Integration  

SciTech Connect

Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INLs primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

Holly M. Ashley; Ronald K. Farris; Robert E. Richards

2009-04-01T23:59:59.000Z

212

Nuclear Medicine Program progress report for quarter ending September 30, 1991  

SciTech Connect

Rat tissue distribution properties of IQNP,'' a new radioiodinated cholinergic-muscarinic receptor antagonist, are described. IQNP is the acronym for 1-azabicyclo(2.2.2)oct-3-yl {alpha}-hydroxy-{alpha}-phenyl-{alpha}(1-iodo-1-propen-3-yl) acetate, which is an analogue of the QNB muscarinic antagonist in which the p-iodophenyl moiety has been replaced with the 1-iodo-1-propen-3-yl moiety. The radioiodinated IQNP analogue is easier to prepare in much higher yields than QNB and is thus a candidate for the evaluation of muscarinic receptors by external imaging techniques. Studies in rats demonstrated that IQNP shows high uptake in those cerebral regions rich in muscarinic receptors QNB-treatment of rats either 1 h before (pre) or 2 h after (post) administration of radioiodinated IQNP resulted in significant displacement or blocking of cerebral specific IQNP uptake (% dose/gm) in the cortex and striatum. These studies demonstrate that IQNP has specificity for the cholinergic-muscarinic receptor and is a good candidate for further studies. Also during this period, several agents developed in the ORNL Nuclear Medicine Program were supplied to Medical Cooperative Programs for collaborative studies including the iodine-125-labeled BMIPP and DMIPP fatty acid analogues and the IPM antibody labeling agent. Tin-117m and gold-199 were produced in the ORNL High Flux Isotope Reactor (HFIR) and supplied to the OHER-supported program in the Medical Department at Brookhaven National Laboratory to aid in their research until the re-start of the High Flux Brookhaven Reactor.

Knapp, F.F. Jr.; Ambrose, K.R.; Callahan, A.P.; McPherson, D.W.; Mirzadeh, S.; Srivastava, P.C.; Hasan, A.; Lambert, C.R.; Lambert, S.J.; Rice, D.E.

1992-02-01T23:59:59.000Z

213

Nuclear Medicine Program progress report for quarter ending September 30, 1991  

SciTech Connect

Rat tissue distribution properties of ``IQNP,`` a new radioiodinated cholinergic-muscarinic receptor antagonist, are described. IQNP is the acronym for 1-azabicyclo[2.2.2]oct-3-yl {alpha}-hydroxy-{alpha}-phenyl-{alpha}(1-iodo-1-propen-3-yl) acetate, which is an analogue of the QNB muscarinic antagonist in which the p-iodophenyl moiety has been replaced with the 1-iodo-1-propen-3-yl moiety. The radioiodinated IQNP analogue is easier to prepare in much higher yields than QNB and is thus a candidate for the evaluation of muscarinic receptors by external imaging techniques. Studies in rats demonstrated that IQNP shows high uptake in those cerebral regions rich in muscarinic receptors QNB-treatment of rats either 1 h before (pre) or 2 h after (post) administration of radioiodinated IQNP resulted in significant displacement or blocking of cerebral specific IQNP uptake (% dose/gm) in the cortex and striatum. These studies demonstrate that IQNP has specificity for the cholinergic-muscarinic receptor and is a good candidate for further studies. Also during this period, several agents developed in the ORNL Nuclear Medicine Program were supplied to Medical Cooperative Programs for collaborative studies including the iodine-125-labeled BMIPP and DMIPP fatty acid analogues and the IPM antibody labeling agent. Tin-117m and gold-199 were produced in the ORNL High Flux Isotope Reactor (HFIR) and supplied to the OHER-supported program in the Medical Department at Brookhaven National Laboratory to aid in their research until the re-start of the High Flux Brookhaven Reactor.

Knapp, F.F. Jr.; Ambrose, K.R.; Callahan, A.P.; McPherson, D.W.; Mirzadeh, S.; Srivastava, P.C.; Hasan, A.; Lambert, C.R.; Lambert, S.J.; Rice, D.E.

1992-02-01T23:59:59.000Z

214

Advanced turbine systems program conceptual design and product development. Quarterly report, August--October 1995  

SciTech Connect

This report describes the tasks completed for the advanced turbine systems program. The topics of the report include last row turbine blade development, single crystal blade casting development, ceramic materials development, combustion cylinder flow mapping, shroud film cooling, directional solidified valve development, shrouded blade cooling, closed-loop steam cooling, active tip clearance control, flow visualization tests, combustion noise investigation, TBC field testing, catalytic combustion development, optical diagnostics probe development, serpentine channel cooling tests, brush seal development, high efficiency compressor design, advanced air sealing development, advanced coating development, single crystal blade development, Ni-based disc forging development, and steam cooling effects on materials.

NONE

1996-01-01T23:59:59.000Z

215

Providing solutions to energy and environmental programs. Quarterly report, October 1--December 31, 1996  

SciTech Connect

The goals of WRI`s jointly sponsored research program are to: (1) increase the production of US and western energy resources--low-sulfur coal, natural gas, oil, and renewable energy resources; (2) enhance the competitiveness of US and western energy technologies in international markets and assist in technology transfer; (3) reduce the nation`s dependence upon foreign energy supplies and strengthen the US and regional economies; and (4) minimize the impact of energy production and utilization on the environment. A summary of appropriations, obligations and expenditures is given, then a summary of objectives and accomplishments for the 21 tasks being supported is presented.

NONE

1996-12-31T23:59:59.000Z

216

Northeast regional biomass program: Second and Third quarterlies and final report, January 1994--September 30, 1994  

SciTech Connect

The Northeast Regional Biomass Program (NRBP) is comprised of the following states: Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania. Rhode Island and Vermont. It is managed for the Department of Energy (DOE) by the CONEG Policy Research Center, Inc. The Northeast states face several near-term barriers to the expanded use of biomass energy. Informational and technical barriers have impeded industrial conversions, delaying the development of a wood energy supply infrastructure. Concern over the environmental impacts on resources are not well understood. Public awareness and concern about safety issues surrounding wood energy use has also grown to the point of applying a brake to the trend of increases in residential applications of biomass energy. In addition, many residential, commercial, industrial, and commercial energy users are discouraged from using biomass energy because of the convenience factor. Regardless of the potential for cost savings, biomass energy sources, aside from being perceived as more esoteric, are also viewed as more work for the user. The Northeast Regional Biomass Program (NRBP) is designed to help the eleven states overcome obstacles and achieve biomass energy potentials.

NONE

1995-07-01T23:59:59.000Z

217

The Geostationary Operational Environment Satellite R-Series Program  

E-Print Network (OSTI)

: GOES-R is a satellite series carrying six instruments designed to enhance weather forecasting, severeGOES-R The Geostationary Operational Environment Satellite R-Series Program Frequently Asked. The GOES-R series of satellites will fly improved spacecraft and instrument technologies, for more timely

Mojzsis, Stephen J.

218

NSTX Program Governance, Research Support and Facility Operation  

E-Print Network (OSTI)

· Milestone performance history · Scheduling operation, maintenance & upgrades · Managing environment, safety of the proposed research environment and resources. Do the collaborative arrangements achieve the goal Program Director Jon Menard Deputy: S. Kaye Engineering Ops Al von Halle Project Engineer Charles Neumeyer

Princeton Plasma Physics Laboratory

219

Emergency Management Fundamentals and the Operational Emergency Base Program  

Directives, Delegations, and Requirements

The Guide provides information about the emergency management fundamentals imbedded in the requirements of DOE O 151.1C, as well as acceptable methods of meeting the requirements for the Operational Emergency Base Program, which ensures that all DOE facilities have effective capabilities for all emergency response. Cancels DOE G 151.1-1, Volume 1.

2007-07-11T23:59:59.000Z

220

Nuclear medicine program progress report for quarter ending December 31, 1992  

SciTech Connect

We describe the synthesis of the cis- and trans-iodovinyl isomers of the new ORNL cholinergic-muscarinicreceptorligand, 1 -azabicyclo[2.2-2]oct-3-yl[alpha]-hydroxy-[alpha]-(1-iodo-l-propen-3-yl)-[alpha]-phenylacetate ( IQNP''). This agent is prepared in high radiochemical yield, and the racemic mixture shows high specificity and selectivity for the cerebral and myocardial receptors. Since two chiral centers are present in this molecule, it is important to evaluate the importance of the absolute configuration of the two centers on receptor specificity. The tributyltin substrates were carefully separated by column chromatography, converted to the iodine-125 analogues by iododestannylation, and evaluated in rats in vivo. While the E'' (trans) isomer cleared rapidly from the receptor-rich areas of rat brain, the Z'' (cis) isomer showed high uptake in these areas but also high concentration in the cerebellum. In contrast, the E,Z-isomeric mixture showed good uptake and retention in the receptor rich areas. Also described in this report is a description of neutron flux measurements in the hydraulic tube position at the ORNL High Flux Isotope Reactor (HFIR). Also during this period, samples of [l-125]- and [l-131]-labeled racemic IQNP'' were supplied through a collaborative program with the Brookhaven National Laboratory for high resolution autoradiographic studies in rat tissues.

Knapp, F.F. Jr.; Ambrose, K.R.; Beets, A.L.; Callahan, A.P.; McPherson, D.W.; Mirzadeh, S.; Hasan, A.; Lambert, C.R.

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Nuclear medicine program progress report for quarter ending December 31, 1992  

SciTech Connect

We describe the synthesis of the cis- and trans-iodovinyl isomers of the new ORNL cholinergic-muscarinicreceptorligand, 1 -azabicyclo[2.2-2]oct-3-yl{alpha}-hydroxy-{alpha}-(1-iodo-l-propen-3-yl)-{alpha}-phenylacetate (``IQNP``). This agent is prepared in high radiochemical yield, and the racemic mixture shows high specificity and selectivity for the cerebral and myocardial receptors. Since two chiral centers are present in this molecule, it is important to evaluate the importance of the absolute configuration of the two centers on receptor specificity. The tributyltin substrates were carefully separated by column chromatography, converted to the iodine-125 analogues by iododestannylation, and evaluated in rats in vivo. While the ``E`` (trans) isomer cleared rapidly from the receptor-rich areas of rat brain, the ``Z`` (cis) isomer showed high uptake in these areas but also high concentration in the cerebellum. In contrast, the E,Z-isomeric mixture showed good uptake and retention in the receptor rich areas. Also described in this report is a description of neutron flux measurements in the hydraulic tube position at the ORNL High Flux Isotope Reactor (HFIR). Also during this period, samples of [l-125]- and [l-131]-labeled racemic ``IQNP`` were supplied through a collaborative program with the Brookhaven National Laboratory for high resolution autoradiographic studies in rat tissues.

Knapp, F.F. Jr.; Ambrose, K.R.; Beets, A.L.; Callahan, A.P.; McPherson, D.W.; Mirzadeh, S.; Hasan, A.; Lambert, C.R.

1993-03-01T23:59:59.000Z

222

Solvent refined coal process: operation of the solvent refined coal pilot plant, Wilsonville, Alabama. First quarter report, January-March 1981  

SciTech Connect

This report summarizes the operating conditions and test results obtained during the first quarter of 1981 at the six ton per day solvent refined coal (SRC-I) pilot plant in Wilsonville, Alabama. The plant operated for approximately two-thirds of the period with a scheduled shutdown, from 22 February to 17 March, accounting for most of the downtime. Kentucky 9 coal from the Fies mine was processed throughout the period. The following potential process improvements and tests were evaluated in the respective process units. SRC Unit: Low severity run tests to evaluate SRC reactor conditions for two-stage liquefaction; process solvent quality studies while simulating demonstration plant conditions with low quality process solvent (anthracene oil); operation of the new, reduced volume and residence time, V103 High Pressure Separator; Evaluation of the hot separator mode of operation; and adjustment of the T102 Vacuum Column operation to determine if it can produce a combined trays 3 and 8 stream that would be an acceptable process solvent (95% boiling at over 450/sup 0/F). CSD Unit: Steam stripping of SRC and LSRC to reduce product-related DAS losses; and ambient and cryogenic SRC sampling comparisons for DAS determination tests. Pressure checking of the hydrotreater unit was completed, and the Dowtherm system was placed in service. Solvent circulation was initiated in the unit as efforts continued to verify equipment performance.

Lewis, H.E.

1981-01-01T23:59:59.000Z

223

Geothermal direct-heat utilization assistance. Federal Assistance Program, Quarterly project progress report, October--December 1994  

SciTech Connect

The report summarizes activities of the Geo-Heat Center (GHC) at Oregon Institute of Technology for the first quarter of Fiscal Year 1995. It describes contacts with parties during this period related to assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research is also being conducted on geothermal energy cost evaluation, low-temperature geothermal resource assessment, use of silica waste from the Cerro Prieto geothermal field as construction materials and geothermal heat pumps. Outreach activities include the publication of a quarterly Bulletin on direct heat applications and dissemination of information on low-temperature geothermal resources and utilization.

Not Available

1994-12-31T23:59:59.000Z

224

Chemical Engineering Division Fuel Cycle Programs. Quarterly progress report, January-March 1979  

SciTech Connect

In the program on pyrochemical and dry processing methods (PDPM) for nuclear fuel, corrosion testing of refractory metals and alloys, graphite, and SiC in PDPM environments was done. A tungsten-metallized Al/sub 2/O/sub 3/-3% Y/sub 2/O/sub 3/ crucible was successfully fabricated. Tungsten microstructure of a plasma-sprayed tungsten crucible was stabilized by nickel infiltration and heat treatment. Solubility measurements of Th in Cd and Cd-Mg alloys were continued, as were experiments to study the reduction of high-fired ThO/sub 2/. Work on the fused salt electrolysis of CaO also was continued. The method of coprocessing of U and Pu by a salt transport process was modified. Tungsten-coated molybdenum crucibles were fabricated. The proliferation resistance of chloride volatility processing of thorium-based fuels is being evaluated by studying the behavior of fission product elements during chlorination of U and Th. Thermodynamic analysis of the phase relationships in the U-Pu-Zn system was initiated. The Pyro-Civex reprocessing method is being reviewed. Reactivity of UO/sub 2/ and PuO/sub 2/ with molten equimolar NaNO/sub 3/-KNO/sub 3/ is being studied along with the behavior of selected fission product elements. Work was continued on the reprocessing of actinide oxides by extracting the actinides from a bismuth solution. Rate of dissolution of UO/sub 2/ microspheres in LiCl/AlCl/sub 3/ was measured. Nitriding rates of Th and U dissolved in molten tin were measured. In work on the encapsulation of radioactive waste in metal, leach rates of a simulated waste glass were studied. Rates of dissolution of metals (potential barrier materials) in aqueous media are being studied. In work on the transport properties of nuclear waste in geologic media, the adsorption of iodate by hematite as a function of pH and iodate concentration was measured. The migration behavior of cesium in limestone was studied in relation to the cesium concentration and pH of simulated groundwater solutions.

Steindler, M J; Ader, M; Barletta, R E

1980-01-01T23:59:59.000Z

225

Office of Security Operations: Headquarters Security Officers (HSO) Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Headquarters Security Officers (HSO) Program Headquarters Security Officers (HSO) Program Responsible Individual/Contact: Wayne Berkebile - (301) 903-1163 - D-320 Scope: The Headquarters Security Officer (HSO) Program was established in 1990 by the Under Secretary of Energy in order to improve communications between the Office of Headquarters Security Operations and component organizations within DOE Headquarters. It is governed by DOE Headquarters Order 472.1, Headquarters Security Officer Program, dated 3-19-2010. Each Headquarters element is required to appoint at least one HSO and an Alternate HSO. HSOs perform a wide variety of security-related functions within their element such as obtaining security badges and clearances, maintaining Security Areas, acquiring security equipment, implementing procedures for protecting classified and sensitive information, conducting security inquiries, and arranging for required security services.

226

Smart microgrid operational planning considering multiple demand response programs  

Science Journals Connector (OSTI)

Microgrid (MG) is one of the important blocks in the future smart distribution systems. The scheduling pattern of MGs affects distribution system operation. Also the optimal scheduling of MGs will result in reliable and economical operation of distribution system. In this paper an operational planning model of a MG which considers multiple demand response programs is proposed. In the proposed approach all types of loads can participate in demand response programs which will be considered in either energy or reserve scheduling. Also the renewable distributed generation uncertainty is covered by reserve provided by both Distributed Generations (DGs) and responsive loads. The novelty of this paper is the demand side participation in energy and reserve scheduling simultaneously. Furthermore the energy and reserve scheduling is proposed for day-ahead and real-time. The proposed model was tested on a typical MG system and the results show that running demand response programs will reduce total operation cost of MG and cause more efficient use of resources.

Alireza Zakariazadeh; Shahram Jadid

2014-01-01T23:59:59.000Z

227

Modeling relay operational characteristics using electromagnetic transients program  

SciTech Connect

There are many commercially available software packages nowadays for power system analysis. These range from load flow, stability, contingency and reliability analysis. The Electro-Magnetic Transients Program is a widely used program for simulation and analysis of power system transients. The Transient Control Analysis Systems, the so-called (TACS) of the EMTP, functions like an analogue computer. This allows signals to be passed between TACS and the electric network simulated by EMTP. In fact, with TACS facilities, it is possible to simulate control circuitry associated with rotating machinery, hvdc converters and static var controllers. It is also possible to extend the application of EMTP to relay testing. If relay models are simulated within the EMTP environment, then it becomes a close-loop simulation as the operation of a particular relay, and thus the associated circuit breaker, would change the system conditions. Subsequent relay operations can then be further investigated. In this manner, dynamic operation of relays can be studies solely on a personal computer with no external hardware arrangement necessary. This paper describes the basic techniques used for simulation of distance relays, such as a self and cross-polarized distance relay commonly used for the protection of transmission circuits. This paper highlights some techniques employed to model dynamic operational characteristics of distance relays using EMTP. Simulation results of a self- and a cross-polarized Mho relay are presented.

Chan, T.W.; Chua, K.M.; Lim, K.T. [Nanyang Technological Univ., Singapore (Singapore)

1995-12-31T23:59:59.000Z

228

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . National Environmental Policy Act N E P . A LESSONS Office of NEPA LEARNED QUARTERLY REPORT 1ST QUARTER FY 1995 Policy and Assistance U.S. Department of Energy March 1,1995 ODU- To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment Safety and Health to solicit comments from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the process, and to distribute a quarterly summary to all,NEPA Compliance Officers and NEPA Document Managers. This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised

229

Engineering support services for the DOE/GRI (Gas Research Institute) Coal Gasification Research Program: Quarterly report, March 28--June 26, 1987  

SciTech Connect

The following joint program projects comprised the scope of Foster Wheeler's current monitoring activities: KRW Energy System, Inc.-- Fluidized-Bed Gasification Process Development Unit (PDU), Madison, Pennsylvania. CNG Research Company--Acid Gas Removal System, Cleveland, Ohio. The test program in KRW's fluidized-bed gasifier PDU was resumed, following shutdown for winter maintenance. During this quarter, CNG completed construction on the new flash crystallizer PDU and started shakedown testing of the unit. Details of Foster Wheeler's monitoring activities on these projects are presented in Sections 3.0 and 4.0 of this report. Under the technical evaluation scope of modular integrated coal gasification combined cycle (IGCC) power systems. This study was authorized by DOE in mid-March 1987 and was initiated during the current period. Discussions on the status of the IGCC systems study is included in Section 5.0 of this report. 4 refs.

Mazzella, G.

1987-07-01T23:59:59.000Z

230

Strategic Petroleum Reserve: Annual/quarterly report  

SciTech Connect

Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

Not Available

1994-02-16T23:59:59.000Z

231

Microsoft Word - ACRF4thQuarterFY09 draft_nb__sal.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 - September 30, 2009 Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research July 1 - September 30, 2009, DOE/SC-ARM/P-09-016 iii Contents 1. Data Availability ................................................................................................................................... 1 2. Scientific Users ..................................................................................................................................... 2 3. Safety .................................................................................................................................................... 4

232

EMSL Quarterly Highlights Report 2nd Quarter FY08  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Highlights Report: 2 Quarterly Highlights Report: 2 nd Quarter, FY08 1 The W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Users are participants on accepted proposals. Staff members work with users to expedite access. The EMSL Quarterly Highlights Report documents research and activities of EMSL staff and users. Research Highlights Atmospheric Aerosol Chemistry

233

FACE Engineering & Operations, FACE Program, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering & Operations Engineering & Operations FACE Program | Homepage Brookhaven provides engineering and operations support to the DOE/BER FACE Facility and other FACE and climate change experiments [ see our support page ]. Brookhaven will provide support for facility design and equipment specification. Once operational, we can provide monitoring of system performance and offer management and operations guidance. We also provide and maintain the control software for the FACE system, monitor performance and maintenance issues at affiliated FACE sites, and distribute solutions, work-arounds and lessons learned as appropriate. History The use of open-air gas releases to treat large scale plots has been undertaken since the 1970's. Hartwell Allen coined the name Free Air Carbon Dioxide Enrichment and the acronym FACE to describe a range of experiments that used open air releases to study the ecological effects of increasing atmospheric concentrations of carbon dioxide (Allen, 1992). Early designs used line source releases, and depended on consistent wind speed and direction or long term averaging to obtain a uniform treatment. In the 1980's circular systems with computer aided feedback control were designed to allow open-air exposures to sulfur dioxide, nitrogen oxides, and ozone (Mooi and van der Zalm 1985; McLeod et al 1985; Hendrey & Miglietta, 2006).

234

Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, July--September 1995  

SciTech Connect

Continental Shelf Associates, Inc. (CSA) was contracted to conduct a three-year study of the environmental and health related impacts of produced water and sand discharges from oil and gas operations. Data on naturally occurring radioactive materials (NORM), heavy metals, and hydrocarbons in water, sediment, and biota will be collected and evaluated. Health related impacts will be studied through field collections and analyses of commercially- and recreationally-important fish and shellfish tissues. Additionally, information on seafood catch, consumption, and use patterns for the Gulf of Mexico will be gathered and analyzed. The facilities to be studied will include both offshore and coastal facilities in the Gulf of Mexico. Coastal sites will be additionally studied to determine ecological recovery of impacted wetland and open bay areas. The economic impact of existing and proposed effluent federal and state regulations will also be evaluated. This report represents the thirteenth quarterly technical summary for the study ``Environmental and Economic Assessment of Discharges from Gulf of Mexico Region Oil and Gas Operations.`` Activities associated with Tasks 3 through 8 are discussed in this report.

Gettleson, D.A.

1995-10-31T23:59:59.000Z

235

U.S. Department of Energy FreedomCAR & Vehicle Technologies Program: Oil Bypass Filter Technology Evaluation Seventh Quarterly Report April - June 2004  

SciTech Connect

This Oil Bypass Filter Technology Evaluation quarterly report (AprilJune 2004) details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and Environmental Laboratory (INEEL) for the U.S. Department of Energys (DOE) FreedomCAR & Vehicle Technologies Program. Eight INEEL four-cycle diesel engine buses used to transport INEEL employees on various routes and six INEEL Chevrolet Tahoes with gasoline engines are equipped with oil bypass filter systems from the puraDYN Corporation. The bypass filters are reported to have engine oil filtering capability of <1 micron and a built-in additive package to facilitate extended oil-drain intervals. This quarter, the eight diesel engine buses traveled 85,632 miles. As of the end of June 2004, the eight buses have accumulated 498,814 miles since the beginning of the test and 473,192 miles without an oil change. This represents an avoidance of 39 oil changes, which equates to 1,374 quarts (343 gallons) of new oil not consumed and, furthermore, 1,374 quarts of waste oil not generated. One bus had its oil changed due to the degraded quality of the engine oil. Also this quarter, the six Tahoe test vehicles traveled 48,193 miles; to date, the six Tahoes have accumulated 109,708 total test miles. The oil for all six of the Tahoes was changed this quarter due to low Total Base Numbers (TBN). The oil used initially in the Tahoe testing was recycled oil; the recycled oil has been replaced with Castrol virgin oil, and the testing was restarted. However, the six Tahoes did travel a total of 98,266 miles on the initial engine oil. This represents an avoidance of 26 oil changes, which equates to 130 quarts (32.5 gallons) of new oil not consumed and, consequently, 130 quarts of waste oil not generated. Based on the number of oil changes avoided by the test buses and Tahoes to date, the potential engine oil savings if an oil bypass filter system were used was estimated for the INEEL, DOE complex and all Federal fleets of on-road vehicles. The estimated potential annual engine oil savings for the three fleets are: INEEL 3,400 gallons, all DOE fleets 32,000 gallons, and all Federal fleet 1.7 million gallons.

Larry Zirker; James Francfort; Jordan Fielding

2004-08-01T23:59:59.000Z

236

Oak Ridge Operations Formerly Utilized Sites Remedial Action Program  

Office of Legacy Management (LM)

IC77GLg /'-Oi. SEP 20 1982 IC77GLg /'-Oi. SEP 20 1982 10-05-04B-001 Deportment of Energy Oak Ridge Operations Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 PRELIMINARY ENGINEERING EVALUATION OF REMEDIAL ACTION ALTERNATIVES BAYO CANYON SITE, LOS ALAMOS, NEW MEXICO SEPTEMBER 1982 Bechtel Job 14501 Bechtel National, Inc. Nuclear Fuel Operations LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use

237

U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation - Sixth Quarterly Report, January - March 2004  

SciTech Connect

This Oil Bypass Filter Technology Evaluation quarterly report (January-March 2004) details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and Environmental Laboratory (INEEL) for the U.S. Department of Energy's FreedomCAR & Vehicle Technologies Program. Eight four-cycle diesel-engine buses used to transport INEEL employees on various routes have been equipped with oil bypass filter systems from the puraDYN Corporation. The bypass filters are reported to have engine oil filtering capability of <1 micron and a built-in additive package to facilitate extended oil-drain intervals. This quarter, the heavy-duty buses traveled 88,747 miles, and as of the end of March 2004, the eight buses have accumulated 412,838 total test miles without requiring an oil change. This represents an avoidance of 34 oil changes, which equates to 1,199 quarts (300 gallons) of new oil not consumed and, furthermore, 1,199 quarts of waste oil not generated.

U.S. Department of Energy; Larry Zirker

2004-06-01T23:59:59.000Z

238

Stockpile Stewardship Quarterly  

National Nuclear Security Administration (NNSA)

1, Number 3 * October 2011 1, Number 3 * October 2011 Message from the Assistant Deputy Administrator for Stockpile Stewardship, Chris Deeney Comments Questions or comments regarding the Stockpile Stewardship Quarterly should be directed to Terri.Batuyong@nnsa.doe.gov Technical Editor: Chris Werner, Publication Editor: Millicent Mischo Defense Programs Stockpile Stewardship in Action Volume 1, Number 3 Inside this Issue 2 Simulation: A Window into the Detonation of High Explosives 3 Modeling of High-Explosive Detonation Performance 5 The Detonation Sandwich 6 Joint DoD/DOE Munitions Technology Development Program-High Explosives 9 New Faces at the Office of Stockpile Stewardship

239

quarterly report- Jan03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Inspector General's Message 1 Top Management Challenges 2 Inadequate Controls in Unclassified Foreign Visits and Assignments Program 2 Nuclear Safety Improvements Needed at the Department's Ashtabula Site 3 Improvements Needed in the Department's Explosive Safety Program 3 Domestic Calutron Isotope Production Capabilities 4 Chiropractor Pleads Guilty to Improper Billing at Hanford 4 Contractor Employee Sentenced for Possession of Child Pornography on a Government Computer 3 Improvements Needed in Business Management Information System Greg Friedman The Office of Inspector General (OIG) is pleased to provide its Quarterly Report to the Secretary as well as the members of the Congress. This report summarizes significant audit, investigation, and

240

Assessment of the O2Diesel Operational Safety Program: December 23, 2002 -- June 30, 2007  

SciTech Connect

This report assesses O2Diesel's operational safety program using its ethanol-diesel blended fuel product.

TIAX LLC

2006-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program  

SciTech Connect

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1996-11-01T23:59:59.000Z

242

Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, 1 January--31 March 1993  

SciTech Connect

Task 3 (Environmental Field Sampling and Analysis of NORM, Heavy Metals, and Organics) activities included the continuation of the platform selection process. A revised sampling plan and a projected cost estimate were prepared for Task 3. A letter detailing the revised plan was sent to the Scientific Review Committee (SRC). Task 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities involved receiving the final approval for sampling two facilities and requesting approval for a third alternative facility. A revised Task 4 sampling plan and projected estimated costs were prepared. The sampling plan was presented to the SRC for comment. Mobilization activities for the first quarterly sampling were initiated. Task 5 (Assessment of Economic Impactsof Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) activities included refining the model for estimating the impact of increased environmental compliance costs on remaining reserves in coastal and offshore fields. Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) activities involved completion and field testing of most survey forms. Retail surveys were initiated and contacts were made with the Vietnamese community. Task 7 (Technology Transfer Plan) work has included scheduling the presentation of information concerning this project at the DOE Contractor Review Meeting in July in Oklahoma. Task 8 (Project Management and Deliverables) activities have involved the submission of the necessary reports and routine management.

Gettleson, D.A.

1993-04-22T23:59:59.000Z

243

Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998  

SciTech Connect

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-07-01T23:59:59.000Z

244

Fossil Energy Today - Second Quarter, 2011 | Department of Energy  

Energy Savers (EERE)

Quarter, 2011 Topics In This Issue... Office Reorganization McConnell Joins FE Staff Coal Cleaning Commercial Success Sonar Survey Program Heating Oil Reserve Converts Stock...

245

Federal Technical Capability Program Operational Plan - FY 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

i i * D D e e c c e e m m b b e e r r 2 2 0 0 1 1 1 1 Revised: February 2012 U U . . S S . . D D E E P P A A R R T T M M E E N N T T O O F F E E N N E E R R G G Y Y F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 1 1 2 2 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N Federal Technical Capability P rogram FY 2012 Operational P lan December 2011 1 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The Department has identified guiding principles to accomplish that objective and identified four general functions of the Federal Technical Capability Program. The guiding principles are:

246

Federal Technical Capability Program Operational Plan - FY 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* D D e e c c e e m m b b e e r r 2 2 0 0 1 1 1 1 Revised: February 2012 U U . . S S . . D D E E P P A A R R T T M M E E N N T T O O F F E E N N E E R R G G Y Y F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 1 1 2 2 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N Federal Technical Capability P rogram FY 2012 Operational P lan December 2011 1 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The Department has identified guiding principles to accomplish that objective and identified four general functions of the Federal Technical Capability Program. The guiding principles are:

247

Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995  

SciTech Connect

The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

NONE

1996-02-01T23:59:59.000Z

248

FOIA Quarterly Reports (Q3 2014)  

Energy.gov (U.S. Department of Energy (DOE))

Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

249

FOIA Quarterly Reports (Q1-2014)  

Energy.gov (U.S. Department of Energy (DOE))

Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

250

ASCeNews Quarterly Newsletter - March/June 2011 | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

March/June 2011 | National Nuclear Security March/June 2011 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Blue Box ASCeNews Quarterly Newsletter - March/June 2011 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASCeNews Quarterly

251

ASC eNews Quarterly Newsletter June 2012 | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

2 | National Nuclear Security 2 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog UOP Students ASC eNews Quarterly Newsletter June 2012 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > ASC Newsletters > ASC eNews Quarterly

252

Valves - current operating experience of slurry valves (block and letdown) in coal liquefaction processes. Third quarter report  

SciTech Connect

This paper summarizes the recent letdown and block valve experience in the liquefaction pilot plants. Also included is a brief description of the research and development activities on valves which are conducted in supporting laboratories. The purpose of the summary is to concentrate on critical component problems common to all liquefaction plants, to avoid duplication of efforts, and to help provide timely solutions to the valve problems. The main source of information used in this paper is the Minutes of the Critical Component and Materials Meeting which is sponsored by the Office of Coal Processing, Fossil Energy, Department of Energy. Other sources of information such as the technical progress reports are also included based on availability and relevance to topics covered in this paper. It is intended that this report will be followed by updates as pertinent information concerning valves becomes available. In the subsequent sections of this paper a brief outline of past valve studies is given as background material followed by a summary of the most recent valve operating experience at the liquefaction plants.

NONE

1996-07-01T23:59:59.000Z

253

Performance indicators for 4th quarter CY 1993  

SciTech Connect

The Department of Energy (DOE) has established a Department-wide Performance Indicator (PI) Program for trending and analysis of operational data as directed by DOE Order 5480.26. The PI Program was established to provide a means for monitoring the environment, safety, and health (ES&H) performance of the DOE at the Secretary and other management levels. This is the twelfth in a series of quarterly reports generated for the Department of Energy Idaho Operations Office (DOE-ID) by EG&G Idaho, Inc., to meet the requirements of the PI Program as directed by the DOE Standard (DOE-STD-1048-92). The report format and content adhere to the guidelines established in DOE Order 5480.26, Trending and Analysis of Operations Information Using Performance Indicators, and DOE-STD-1048-92, DOE Performance Indicators Guidance Document.

Not Available

1994-11-01T23:59:59.000Z

254

Enterprise SRS: Leveraging Ongoing Operations to Advance National Programs - 13108  

SciTech Connect

The SRS is re-purposing its vast array of assets to solve future national issues regarding environmental stewardship, national security, and clean energy. The vehicle for this transformation is Enterprise SRS which presents a new, strategic view of SRS as a united endeavor for 'all things nuclear' as opposed to a group of distinct and separate entities with individual missions and organizations. Key among the Enterprise SRS strategic initiatives is the integration of research into facilities in conjunction with ongoing missions to provide researchers from other national laboratories, academic institutions, and commercial entities the opportunity to demonstrate their technologies in a relevant environment and scale prior to deployment. To manage that integration of research demonstrations into site facilities, The DOE Savannah River Operations Office, Savannah River Nuclear Solutions, and the Savannah River National Laboratory (SRNL) have established the Center for Applied Nuclear Materials Processing and Engineering Research (CANMPER). The key objective of this initiative is to bridge the gap between promising transformational nuclear materials management advancements and large-scale deployment of the technology by leveraging SRS assets (e.g. facilities, staff, and property) for those critical engineering-scale demonstrations necessary to assure the successful deployment of new technologies. CANMPER will coordinate the demonstration of R and D technologies and serve as the interface between the engineering-scale demonstration and the R and D programs, essentially providing cradle-to-grave support to the R and D team during the demonstration. While the initial focus of CANMPER will be on the effective use of SRS assets for these demonstrations, CANMPER also will work with research teams to identify opportunities to perform R and D demonstrations at other facilities. Unique to this approach is the fact that these SRS assets will continue to accomplish DOE's critical nuclear material missions (e.g., processing in H-Canyon and plutonium storage in K-Area). The demonstration can be accomplished in a more cost-effective manner through the use of existing facilities in conjunction with ongoing missions. Essentially, the R and D program would not need to pay the full operational cost of a facility, just the incremental cost of performing the demonstration. Current CANMPER activities have been focused on integrating advanced safeguards monitoring technology demonstrations into the SRS H-Canyon and advanced location technology demonstrations into K-Area Materials Storage. These demonstrations are providing valuable information to researchers and program owners. In addition these demonstrations are providing CANMPER with an improved protocol for demonstration management that can be exercised across the entire SRS (and to offsite venues) to ensure that future demonstrations are done efficiently and provide an opportunity to use these unique assets for multiple purposes involving national laboratories, academia, and commercial entities. Key among the envisioned future demonstrations is the use of H-Canyon to demonstrate new nuclear materials separations technologies critical for advancing the mission needs of three major program offices: DOE-EM, DOE-Nuclear Energy (DOE-NE), and the NNSA. Given the modular design of H-Canyon, the demonstrations would be accomplished using a process frame. The demonstration equipment would be installed on the process frame and that frame would then be positioned into an H Canyon cell so that the demonstration is performed in a radiological environment involving prototypic nuclear materials. (authors)

Marra, J.E.; Murray, A.M. [Savannah River National Laboratory, Building 773-A, Aiken S.C 29808 (United States)] [Savannah River National Laboratory, Building 773-A, Aiken S.C 29808 (United States); McGuire, P.W.; Wheeler, V.B. [Department of Energy-Savannah River Operations Office, Aiken SC 29808 (United States)] [Department of Energy-Savannah River Operations Office, Aiken SC 29808 (United States)

2013-07-01T23:59:59.000Z

255

The AMTEX Partnership{trademark}. Fourth quarter FY95 report  

SciTech Connect

The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. The operations and program management of the AMTEX Partnership{trademark} is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership. Progress is reported on the following projects: computer-aided fabric evaluation; cotton biotechnology; demand activated manufacturing architecture; electronic embedded fingerprints; on-line process control for flexible fiber manufacturing; rapid cutting; sensors for agile manufacturing; and textile resource conservation.

NONE

1995-09-01T23:59:59.000Z

256

Novel bimetallic dispersed catalysts for temperature-programmed coal liquefaction. Quarterly technical progress report, July--September 1995  

SciTech Connect

Coal liquefaction involves cleavage of methylene, dimethylene and ether bridges connecting polycyclic aromatic units and the reactions of various oxygen functional groups. Here in this quarterly, we report on the hydrocracking of 4-(l-naphthylmethyl)bibenzyl in the presence of iron (Fe) catalysts and sulfur and residual wall catalytic effect. Catalytic hydrocracking of 4-(1-naphthylmethyl)bibenzyl (NMBB) predominantly yielded naphthalene and 4-methylbibenzyl. Various iron compounds were examined as catalyst precursors. Sulfur addition to most catalyst precursors led to substantially higher catalyst activity and higher conversion. NMBB was also treated with sulfur in the absence of iron compounds, in concentrations of 1.2-3.4 wt%, corresponding to the conditions present in reactions with added iron compounds. Increasing sulfur concentrations led to higher NMBB conversions. Furthermore, sulfur had a permanent effect on the reactor walls. A black sulfide layer formed on the surface which could not be removed mechanically. The supposed non-catalytic reactions done in the same reactor but after experiments with added sulfur showed higher conversions than comparable experiments done in new reactors. This wall catalytic effect can be reduced by treating the sulfided reactors with hydrochloric acid. The results of this work demonstrate the significant effect of sulfur addition and sulfur-induced residual wall effects on carbon-carbon bond cleavage and hydrogenation of aromatics.

Song, Chunshan; Schmidt, E.; Schobert, H.H.

1996-01-01T23:59:59.000Z

257

FTCP FY09 Operational Plan GOAL 2 White Paper - Mentoring Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 of 3 Page 1 of 3 FTCP White Paper Regarding Mentoring Programs Available To Technical Qualification Program Employees in DOE and NNSA Introduction: The FTCP FY2009 Operational Plan Goal 2 (Preserve and Enhance Technical Credibility) calls for "Establishing an Effective Mid-Level Recruitment Program", and to "Establish an effective mentoring program" to ensure critical knowledge transfer in designated Technical Qualification positions affecting defense nuclear facilities. The Operational Plan Team researched existing programs within the Department and determined that DOE has been successfully managing a mentoring program and NNSA piloted and is in the process of establishing a formal mentoring program. The Team recommended and the FTCP agreed to use

258

ARM - Historical Operational Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

(PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) 2013 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF)...

259

Microsoft Word - Defense Science Quarterly 08-08.doc  

National Nuclear Security Administration (NNSA)

August 2008 August 2008 Defense Science Quarterly Inside This Issue 1 Message from the Director 2 Derivative Applications of Pulsed Power Science and Technology 4 LANSCE-R Means More Beam for National Security Research 6 Dual Axis Radiographic Hydrodynamics Test (DARHT) 2 nd Axis Completed and Put into Operation 7 Annual Symposium of the Stewardship Science Graduate Fellowship Program 8 Publication Highlights 9 ICOPS 2008 9 Highlights and Awards Message from the Director Chris Deeney, Defense Science Division It's hard to believe it's been a year since we published our first issue of the Defense Science Quarterly. I would like to express my appreciation to all the authors who have submitted articles and to the production staff. If you are

260

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Capacity (short tons of ore per day) 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 EFR White Mesa LLC White Mesa Mill San Juan, Utah 2,000 Operating Operating Operating Operating-Processing Alternate Feed Energy Fuels Resources Corporation Piñon Ridge Mill Montrose, Colorado 500 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Permitted And Licensed Energy Fuels Wyoming Inc Sheep Mountain Fremont, Wyoming 725 - Undeveloped Undeveloped Undeveloped Kennecott Uranium Company/Wyoming Coal Resource Company Sweetwater Uranium Project Sweetwater, Wyoming 3,000

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Use of a Conversational Computer Program in Operator Training for Improved Energy Efficiency  

E-Print Network (OSTI)

Energy efficient operation of process equipment requires attentive operation by well-trained personnel. Use of a computer simulation model together with a conversational computer program, which provides dynamic game playing opportunities...

Brickman, S. W.; Mergens, E. H.

1980-01-01T23:59:59.000Z

262

Site operator program final report for fiscal years 1992 through 1996  

SciTech Connect

The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1998-01-01T23:59:59.000Z

263

Gas Research Institute improved fracturing. Unconventional natural gas program, eastern devonian shales diagnostic program: Black No. 1 well experiment results. Third quarterly report, October 1979-December 1979  

SciTech Connect

During the last quarter of 1979, Sandia National Laboratories participated in an experiment with Thurlow Weed and Associates and the Morgantown Energy Technology Center. This Devonian Shale gas stimulation experiment was conducted in an area north of Columbus, Ohio. One purpose of the experiment was to apply the diagnostic instrumentation that is available for fracture mapping and characterization to increase our understanding of the stimulation technique. The induced fracture apparently followed a pre-existing fracture vertically from the borehole with an orientation of the N 62/sup 0/ E and in the latter stages of the stimulation turned into a shallower horizontal fracture. This fracture behavior was confirmed by several diagnostic analyses and demonstrates the insight that can be gained by fully instrumented stimulation experiments.

Schuster, C.L. (ed.)

1980-02-01T23:59:59.000Z

264

FTCP Quarterly Report on Federal Technical Capability, February 24, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

265

FTCP Quarterly Report on Federal Technical Capability, November 20, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

266

FTCP Quarterly Report on Federal Technical Capability, March 6, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

267

FTCP Quarterly Report on Federal Technical Capability, August 8, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

268

FTCP Quarterly Report on Federal Technical Capability, May 30, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

269

FTCP Quarterly Report on Federal Technical Capability, September 2, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

270

FTCP Quarterly Report on Federal Technical Capability, July 3, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

271

FTCP Quarterly Report on Federal Technical Capability, December 15, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

272

Advanced Turbine Systems (ATS) program conceptual design and product development. Quarterly progress report, December 1, 1995--February 29, 1996  

SciTech Connect

This report describes the overall program status of the General Electric Advanced Gas Turbine Development program, and reports progress on three main task areas. The program is focused on two specific products: (1) a 70-MW class industrial gas turbine based on the GE90 core technology, utilizing a new air cooling methodology; and (2) a 200-MW class utility gas turbine based on an advanced GE heavy-duty machine, utilizing advanced cooling and enhancement in component efficiency. The emphasis for the industrial system is placed on cycle design and low emission combustion. For the utility system, the focus is on developing a technology base for advanced turbine cooling while achieving low emission combustion. The three tasks included in this progress report are on: conversion to a coal-fueled advanced turbine system, integrated program plan, and design and test of critical components. 13 figs., 1 tab.

NONE

1997-06-01T23:59:59.000Z

273

Voluntary Protection Program Onsite Review, Livermore Operations- January 2012  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether the Livermore Operations is continuing to perform at a level deserving DOE-VPP Star recognition.

274

Voluntary Protection Program Onsite Review, Los Alamos Operations- November 2011  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether Los Alamos Operations is continuing to perform at a level deserving DOE-VPP Star recognition.

275

ASC eNews Quarterly Newsletter March 2013 | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

March 2013 | National Nuclear Security March 2013 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration ASC eNews Quarterly Newsletter March 2013 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and

276

ASC eNews Quarterly Newsletter June 2013 | National Nuclear Security  

National Nuclear Security Administration (NNSA)

3 | National Nuclear Security 3 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration ASC eNews Quarterly Newsletter June 2013 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and

277

ASC eNews Quarterly Newsletter September 2012 | National Nuclear Security  

National Nuclear Security Administration (NNSA)

September 2012 | National Nuclear Security September 2012 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration ASC eNews Quarterly Newsletter September 2012 Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and

278

U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Fifth Quarterly Report October - December 2003  

SciTech Connect

This Oil Bypass Filter Technology Evaluation quarterly report (October-December 2003) details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and Environmental Laboratory (INEEL) for the U.S. Department of Energy's FreedomCAR & Vehicle Technologies Program. Eight four-cycle diesel-engine buses used to transport INEEL employees on various routes have been equipped with oil bypass filter systems from the puraDYN Corporation. The bypass filters are reported to have engine oil filtering capability of <1 micron and a built-in additive package to facilitate extended oil-drain intervals. To date, the eight buses have accumulated 324,091 test miles. This represents an avoidance of 27 oil changes, which equate to 952 quarts (238 gallons) of new oil not conserved and therefore, 952 quarts of waste oil not generated. To validate the extended oil-drain intervals, an oil-analysis regime is used to evaluate the fitness of the oil for continued service by monitoring the presence of necessary additives, undesirable contaminants, and engine-wear metals. The test fleet has been expanded to include six Chevrolet Tahoe sport utility vehicles with gasoline engines.

Larry Zirker; James Francfort

2004-02-01T23:59:59.000Z

279

Lessons Learned Quarterly Report, December 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 1999 Lessons Learned Quarterly Report, December 1999 Lessons Learned Quarterly Report, December 1999 Welcome to the 21st Quarterly Report on lessons learned in the NEPA process. This report includes: Good Information, Good Government; CEQ 1997 Report to Congress on Environmental Quality" Managing a National Public Participation Program for the Yucca Mountain EIS New Executive Order on Trade Agreements NEPA Challenges for Western Area Power Administration Is CD-ROM a Useful Complement to Paper Documents? Pollution Prevention and NEPA Clean Air Act Conformity and NEPA National Natural Landmark Considerations Include Distribution List in EIS Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, June 2002 Lessons Learned Quarterly Report, September 2002

280

Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 1  

SciTech Connect

This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management.

Not Available

1993-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April- June 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

651 651 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April-June 2005 TECHNICAL REPORT Larry Zirker James Francfort Jordan Fielding September 2005 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-05-00651 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April-June 2005 Larry Zirker James Francfort Jordan Fielding September 2005 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

282

Final version of completed and signed program sheet due to the department no later than one month prior to the last quarter of senior year.  

E-Print Network (OSTI)

-counting. CS 140 or 143 Operating Systems or Compilers 4 EE 109 Digital Systems Design Lab 4 EE 271 VLSI Advanced Topics in Networking 4 CS 244E Low-Power Wireless Networking 3 EE 273 Digital Systems Engineering-2009 Program Sheet Computer Systems Engineering - Digital Systems Specialization *Follow all requirements

Pratt, Vaughan

283

Basic MATLAB Programming MATLAB is a matrix-based language. Since operations may be  

E-Print Network (OSTI)

CHAPTER 11 Basic MATLAB Programming MATLAB is a matrix-based language. Since operations may. As a consequence, MATLAB programs are often much shorter and easier to read than programs written for instance in C or Fortran. Below, we mention basic MATLAB commands, which will allow a novice to start using this software

Lega, Joceline

284

DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 CHAPTER 2 IMPLEMENTATION GUIDANCE FOR OPERATIONAL CONFIGURATION MANAGEMENT This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. 2.1 PROGRAM MANAGEMENT ELEMENT The program management element of a configuration management (CM) program coordinates program development and implementation and ensures overall program effectiveness. This element leads the development of the other CM program elements. Development of an effective CM program should be initiated promptly, where needed, to address known issues, to improve compliance with various DOE Orders, and to produce the benefits of improved safety, reduced errors, and increased efficiency.

285

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Maintenance Operations and Maintenance Graphic of the eTraining logo Training Available Advanced Electric Metering in Federal Facilities: Learn how to take full advantage of advanced electric metering systems by taking this FEMP eTraining course. Many helpful resources about operations and maintenance are available. Best Practices Operations and Maintenance Best Practices Guide: Outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website features events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information on ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and institutional buildings and central plant facilities.

286

M-area hazardous waste management facility groundwater monitoring and corrective-action report, First quarter 1995, Volume 1  

SciTech Connect

This report, in three volumes, describes the ground water monitoring and c corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during the fourth quarter 1994 and first quarter 1995. Concise description of the program and considerable data documenting the monitoring and remedial activities are included in the document. This is Volume 1 covering the following topics: sampling and results; hydrogeologic assessment; water quality assessment; effectiveness of the corrective-action program; corrective-action system operation and performance; monitoring and corrective-action program assessment; proposed monitoring and corrective-action program modifications. Also included are the following appendicies: A-standards; B-flagging criteria; C-figures; D-monitoring results tables; E-data quality/usability assessment.

NONE

1995-05-01T23:59:59.000Z

287

Advanced Turbine Systems (ATS) program conceptual design and product development. Quarterly report, December 1, 1994--February 28, 1995  

SciTech Connect

Achieving the advanced turbine system goals of 60% efficiency, 8 ppmvd NOx and 10% electric power cost reduction imposes competing characteristics on the gas turbine system. Two basic technical issues arise from this. The turbine inlet temperature of the gas turbine must increase to achieve both efficiency and cost goals. However, higher temperatures move in the direction of increased NOx emission. Improved costing and materials technologies along with creative combustor design can result in solutions to achieve the ultimate goal. The GE Advanced Gas Turbine Development program is focused on two specific products: (1) a 70 MW class industrial gas turbine based on the GE90 core technology utilizing an innovative air cooling methodology; (2) a 200 MW class utility gas turbine based on an advanced GE heavy duty machines utilizing advanced cooling and enhancement in component efficiency. Both of these activities require the identification and resolution of technical issues critical to achieving Advanced Turbine System (ATS) goals. The emphasis for the industrial ATS will be placed upon innovative cycle design and low emission combustion. The emphasis for the utility ATS will be placed upon innovative cycle design and low emission combustion. The emphasis for the utility ATS will be placed on developing a technology base for advanced turbine cooling while utilizing demonstrated and planned improvements in low emissions combustion. Significant overlap in the development programs will allow common technologies to be applied to both products. GE`s Industrial and Power Systems is solely responsible for offering Ge products for the industrial and utility markets. The GE ATS program will be managed fully by this organization with core engine technology being supplied by GE Aircraft Engines (GEAE) and fundamental studies supporting both product developments being conducted by GE Corporate Research and Development (CRD).

NONE

1995-12-31T23:59:59.000Z

288

Coal cooperative efficiency program: small mine operations. Final report  

SciTech Connect

This study researched the concept of small coal operators combining to form a coal cooperatives as a means of providing services and to improve their economic position in coal markets. A small coal operators attitude survey was completed in Appalachia, along with actual interviews of numerous operators in two case study areas--Clearfield, Pennsylvania, and Beckley, West Virginia. A profile of small operator facilities and operations was developed along with suggested coal cooperative configurations in the two case study areas. A general administrative services co-op was suggested for the Beckley area and a capital intensive coal processing/transloading co-op for the Clearfield area. From a review of the vast experience in U.S. agricultural cooperatives a step-by-step procedure for forming a coal co-op is detailed from the idea stage to the first Board of Director's meeting. An extensive economic analysis is included to demonstrate potential member benefit-costs. Recommendations are made to operator, state, regional and federal sectors to develop demonstration coal cooperatives to further prove out the concept.

Multcher, J.

1980-09-01T23:59:59.000Z

289

Appropriate-Technology Small-Grants Program, Chicago Operations Office  

SciTech Connect

Grants totaling $1,290,837 were awarded during FY 1979 to 60 program participants in Illinois, Indiana, Michigan, Minnesota, Ohio and Wisconsin. Review showed that some grantees misused grant monies and did not comply with grant provisions primarily due to insufficient on-site monitoring of the grantees' progress and expenditures. Recommendations to achieve the objectives of the program were: more timely and systematic monitoring; curtail or stop funds for grant projects with unsatisfactory progress or of questionable merit; substantiate expenditures by grantees before disbursing grant funds; and consider increasing program management capability by staffing alternatives. Corrective action taken or planned by the Manager/Regional Representative is identified in an appendix. (PSB)

Not Available

1981-05-29T23:59:59.000Z

290

SPEAR 3 Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

through December through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management Control System (PMCS) area is now headed by Steve McNiel who replaces Teri Knight. Teri has helped set-up the PMCS operation and reporting system over the last year and we deeply appreciate her efforts. Both Steve and Teri have the experience of utilizing the Primavera/Cobra system for tracking and

291

Advanced turbine systems (ATS) program conceptual design and product development. Quarterly report, September 1 - November 30, 1994  

SciTech Connect

Achieving the advanced turbine system goals of 60% efficiency, 8 ppmvd NOx, and 10% electric power cost reduction imposes competing characteristics on the gas turbine system: the turbine inlet temperature must increase, although this will lead to increased NOx emission. Improved coating and materials along with creative combustor design can result in solutions. The program is focused on two specific products: a 70 MW class industrial gas turbine based on GE90 core technology utilizing an innovative air cooling methodology, and a 200 MW class utility gas turbine based on an advanced GE heavy duty machines utilizing advanced cooling and enhancement in component efficiency. This report reports on tasks 3-8 for the industrial ATS and the utility ATS. Some impingement heat transfer results are given.

NONE

1994-12-31T23:59:59.000Z

292

[Gas cooled fuel cell systems technology development program]. Quarterly technical progress narrative No. 21, December 1, 1987--February 29, 1988  

SciTech Connect

Objective is the development of a gas-cooled phosphoric acid fuel cell for electric utility power plant application. Primary objectives are to: demonstrate performance endurance in 10-cell stacks at 70 psia, 190 C, and 267 mA/cm{sup 2}; improve cell degradation rate to less than 8 mV/1000 hours; develop cost effective criteria, processes, and design configurations for stack components; design multiple stack unit and a single 100 kW fuel cell stack; design a 375 kW fuel cell module and demonstrate average cell beginning-of-use performance; manufacture four 375-kW fuel cell modules and establish characteristics of 1.5 MW pilot power plant. The work is broken into program management, systems engineering, fuel cell development and test, facilities development.

Not Available

1988-03-01T23:59:59.000Z

293

94-1 R&D Program Annual Operating Plan  

SciTech Connect

The 94-1 R&D Program focuses on developing the technical basis for stabilizing and safely storing plutonium-bearing materials. To address these issues, we have in place a material identification and stabilization project, a surveillance and monitoring project, and a management team.

Mason, Richard E.; Dominguez, Pamela D.

2003-09-01T23:59:59.000Z

294

DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 CHAPTER 3 IMPLEMENTATION GUIDANCE FOR DESIGN RECONSTITUTION This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. The implementation guidance is presented in the general sequence in which the design reconstitution (DR) adjunct program is expected to be developed and implemented. Figure 3-1 presents the top- level flowchart for the DR adjunct program. 3.1 PROGRAM PLANS AND PROCEDURES 3.1.1 DESIGN RECONSTITUTION PROGRAM PLAN The DR program plan should address the topics defined in program criterion 1.3.1.1.c. It should be prepared in accordance with direction set forth by the program management element of the CM

295

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1998 1 March 1998 1 continued on page 2 For First Quarter FY 1998 March 2, 1998, Issue No. 14 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Managing Progress on the Repository EIS How to Move a Mountain Tour members approach the entry to the Yucca Mountain Exploratory Studies Facility. The EIS Management Council, along with members and technical advisors of the EIS Preparation Team, visited the site in January while participating in briefings on technical, legal, and policy issues. How do you manage preparation of a major EIS that is important to five Program Offices, four Field Offices, and other Federal agencies, not to mention a wide array of stakeholders? How do you address extremely complex and

296

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1994  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LESSONS LEARNED QUARTERLY REPORT 4TH QUARTER FY1994 Oflicx of NEPA Oversight U.S. Department of Energy December ~ 1994 INTRODUCTION . To fdster continuing improvementof the Department's National Environmental policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEP& issued June 13, 1994, requires the OffIceof Environment StUetyand Health to soiicit comments tkom the NEPA Document Manager, the NEPA Compliance Offker, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the proces~ and to distribute a -Y SUmmW tOall NEpA Gmplf-c Offfcem and NEPA Document Managem On August Q 1994 the Oftice of NEPA Oversight distributed an interhddraft kSSOI.W ]WImed questionnaire to NEPA contacts to be used for reporting on environmental impact statements and environmental assessments approvedbetween

297

Environment, Safety, and Health Program for Department of Energy Operations  

Directives, Delegations, and Requirements

This Page Change transmits revised pages of DOE O 5480.1B to renew the authority fo the Assistant Secretary for Environment, Safety and Health to curtail or suspend operations at Department of Energy facilities. Chg 1 dated 5-10-93. Canceled by DOE N 251.4.

1986-09-23T23:59:59.000Z

298

Operations manual for the plasma source ion implantation economics program  

SciTech Connect

Plasma Source Ion Implantation (PSII) is a surface modification technique for metal. PSIICOSTMODEL95 is an EXCEL-based program that estimates the cost for implementing a PSII system in a manufacturing setting where the number of parts to be processed is over 5,000 parts per day and the shape of each part does not change from day to day. Overall, the manufacturing process must be very well defined and should not change. This document is a self-contained manual for PSIICOSTMODEL95. It assumes the reader has some general knowledge of the technical requirements for PSII. Configuration of the PSII process versus design is used as the methodology in PSIICOSTMODEL95. The reason behind this is twofold. First, the design process cannot be programmed into a computer when the relationships between design variables are not understood. Second, the configuration methodology reduces the number of assumptions that must be programmed into our software. Misuse of results are less likely to occur if the user has fewer assumptions to understand.

Bibeault, M.L.; Thayer, G.R.

1995-10-01T23:59:59.000Z

299

Natural gas imports and exports: First quarter report 1995  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This quarter`s focus is market penetration of gas imports into New England. Attachments show the following: % takes to maximum firm contract levels and weighted average per unit price for the long-term importers, volumes and prices of gas purchased by long-term importers and exporters, volumes and prices for gas imported on short-term or spot market basis, and gas exported short-term to Canada and Mexico.

NONE

1995-07-01T23:59:59.000Z

300

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

Not Available

1991-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEPTEMBER 1998 1 SEPTEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT DOE NEPA Community to Meet in October For Third Quarter FY 1998 September 1, 1998, Issue No. 16 On October 14 and 15, 1998, the DOE NEPA Community will meet in North Las Vegas, hosted by the Nevada Operations Office at its new Support Facility. The Office of NEPA Policy and Assistance is sponsoring this meeting to improve DOE NEPA performance through sharing of lessons learned and discussion of current issues. Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process The meeting will focus on issues that NEPA Document Managers face daily: What tools and techniques can help

302

NEPA Lessons Learned Quarterly Report - 1st Quarter FY2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2000 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 2000 March 1, 2000; Issue No. 22 Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources continued on page 4 By: Thomas W. Ferns, NEPA Document Manager, Richland Operations Office, and Yardena Mansoor, Office of NEPA Policy and Assistance A 50-year land-use plan for the Hanford Site? Some said it couldn't be done. Too many factions, they said, with irreconcilably different visions for the future. Would NEPA be a help or a hindrance in developing such a land-use plan? It turns out that the Hanford Comprehensive Land-Use Plan EIS Record of Decision (ROD) (64 FR 61615; November 12, 1999) marks the end of a successful, albeit

303

Federal Energy Management Program: Federal Requirements for Operations and  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Maintenance Operations and Maintenance The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving metering requirements, and any determination by the agency that advanced meters or metering systems are not practical in their specific situation.

304

Quarterly coal report  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1995 and aggregated quarterly historical data for 1987 through the third quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

Young, P.

1996-05-01T23:59:59.000Z

305

Lessons Learned Quarterly Report, December 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Welcome to the 29th quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Included in this issue: CEQ Chair Describes Goals, Supports NEPA Principles DOE NEPA Post-9/11: Reconciling the Need to Protect and the Need to Inform the Public Agencies Responses to Terrorist Attacks Forest Service Succeeds with NEPA Training Oak Ridge Holds NEPA Community Meeting DOE-wide NEPA Contracts Update Training Opportunities New on the NEPA Bookshelf Litigation Update EAs and EISs Completed This Quarter Recent EIS-Related Milestones Fourth Quarter FY 2001 Questionnaire Results NEPA Document Cost and Time Facts

306

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 4, 2007 September 4, 2007 Lessons Learned Quarterly Report, September 2007 Welcome to the 52nd quarterly report on lessons learned in the NEPA process. This issue highlights the start of two major DOE EISs and features several guest-written articles. June 1, 2007 Lessons Learned Quarterly Report, June 2007 Welcome to the 51st quarterly report on lessons learned in the NEPA process. This issue features collaboration as a key element of a successful NEPA process. Related articles discuss approaches to and benefits of collaboration and illustrate various applications. March 1, 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the

307

Order Module--self-study program: HAZARDOUS WASTE OPERATIONS AND EMERGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

self-study program: HAZARDOUS WASTE OPERATIONS AND self-study program: HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE Order Module--self-study program: HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE This module will discuss the objectives and requirements associated with this rule from the code of federal regulations. We have provided an example to help familiarize you with the material. The example will also help prepare you for the practice at the end of this module and for the criterion test. Before continuing, you should obtain a copy of the regulation at Hazardous waste operations and emergency response or through the course manager. You may need to refer to these documents to complete the example, practice, and criterion test. DOE Order Self Study Modules - 29 CFR 1910.120 Hazardous Waste Operations

308

Directives Quarterly Updates  

Directives, Delegations, and Requirements

Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

309

Financial News for Major Energy Companies, Fourth Quarter 2005  

Gasoline and Diesel Fuel Update (EIA)

Fourth Quarter 2005 Fourth Quarter 2005 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $28.7 billion on revenues of $298.4 billion (i.e., 9.6 cents of net income per dollar of revenue) during the fourth quarter of 2005 (Q405). The level of net income for Q405 was 43 percent higher than in the fourth quarter of 2004 (Q404) (Table 1). Net income for Q405

310

Certificate Program in Transit Management and Operations Allan Byam, Krystal Oldread, UMass Transit Services  

E-Print Network (OSTI)

Certificate Program in Transit Management and Operations Allan Byam, Krystal Oldread, UMass TransitDOT · Managed by the First Transit Management group · 400 buses, 26.4 million passengers/yr, travel 12 million-level managers ! Leadership APTA, National Transit Institute, Professional Certifications ! Programs for skilled

Massachusetts at Amherst, University of

311

Catalytic multi-stage liquefaction of coal. Ninth quarterly report, October 1, 1994--December 31, 1994  

SciTech Connect

This quarterly report covers the activities of Catalytic Multi-Stage Liquefaction of Coal during the Period October 1 - December 31, 1994, at Hydrocarbon Research, Inc. in Lawrenceville and Princeton, New Jersey. This DOE Contract Period was from December 8, 1992 to December 7, 1994 and has been extended to September 30, 1995. The overall objective of this program is to produce liquid fuels from coal by direct liquefaction at a cost that is competitive with conventional fuels. Specifically, this continuous bench-scale program contains provisions to examine new ideas in areas such as: low temperature pretreatments, more effective catalysts, on-line hydrotreating, new coal feedstocks, other hydrogen sources, more concentrated coal feeds and other highly responsive process improvements while assessing the design and economics of the bench-scale results. This quarterly report covers work on Laboratory Scale Studies, Continuous Bench-Scale Operations, Technical Assessment and Project Management.

Comolli, A.G.; Johnson, E.S.; Lee, L.K. [and others

1995-06-01T23:59:59.000Z

312

Idaho National Laboratory Quarterly Performance Analysis - 3rd Quarter FY2014  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other non-reportable issues identified at INL from July 2013 through June 2014.

Lisbeth A. Mitchell

2014-09-01T23:59:59.000Z

313

Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

Lisbeth A. Mitchell

2014-06-01T23:59:59.000Z

314

2Q CY2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2008 (PDF), Facility Representative Program Performance 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 87% Fully Qualifed ( last quarter was 85%) 86% Staffing Level ( last quarter was 88%)

315

Audit of the Richland Operations Office Site Characterization Program, IG-0368  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 1995 0, 1995 IG-1 INFORMATION: Report on "Audit of the Richland Operations Office Site Characterization Program" The Secretary BACKGROUND: With its designation as an environmental cleanup site in 1989, the Hanford Site has represented a major activity of the Department of Energy (Department). The final cleanup of this site is estimated to take over 50 years and cost close to $100 billion. Although there are many factors influencing the operations at Hanford, the Department and the Richland Operations Office (Richland) are ultimately responsible for its success. The Department and Richland are responsible for establishing procedures that ensure program goals are accomplished using the most cost-effective methods. DISCUSSION:

316

DOE performance indicators for 2nd quarter CY 1993  

SciTech Connect

The Department of Energy (DOE) has established a Department-wide Performance Indicator (PI) Program for trending and analysis of operational data as directed by DOE Order 5480.26. The PI Program was established to provide a means for monitoring the environment, safety, and health (ES&H) performance of the DOE at the Secretary and other management levels. This is the tenth in a series of quarterly reports generated for the Department of Energy Idaho Operations Office (DOE-ID) by EG&G Idaho, Inc. to meet the requirements of the PI Program as directed by the DOE Standard (DOE-STD-1048-92). The information in this tenth quarterly report, while contributing to a historical database for supporting future trending analysis, does not at this time provide a sound basis for developing trend-related conclusions. In the future, it is expected that trending and analysis of operational data will enhance the safety culture in both DOE and contractor organizations by providing an early warning of deteriorating environment, safety, and health conditions. DOE-STD-1048-92 identifies four general areas of PIs. They are: Personnel Safety, Operational Incidents, Environment, and Management. These four areas have been subdivided into 26 performance indicators. Approximately 115 performance indicator control and distribution charts comprise the body of this report. A brief summary of PIs contained in each of these general areas is provided. The four EG&G facilities whose performance is charted herein are as follows: (1) The Advanced Test Reactor (ATR), (2) The Radioactive Waste Management Complex (RWMC), (3) The Waste Experimental Reduction Facility (WERF), and (4) The Test Reactor Area (TRA) Hot Cells.

Not Available

1993-11-01T23:59:59.000Z

317

EIA -Quarterly Coal Distribution  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Distribution Coal Distribution Home > Coal> Quarterly Coal Distribution Back Issues Quarterly Coal Distribution Archives Release Date: June 27, 2013 Next Release Date: September 2013 The Quarterly Coal Distribution Report (QCDR) provides detailed quarterly data on U.S. domestic coal distribution by coal origin, coal destination, mode of transportation and consuming sector. All data are preliminary and superseded by the final Coal Distribution - Annual Report. Year/Quarters By origin State By destination State Report Data File Report Data File 2009 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf October-December pdf xls pdf 2010 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf xls

318

Idaho National Laboratory Quarterly Performance Analysis  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INL from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.

Lisbeth Mitchell

2014-11-01T23:59:59.000Z

319

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 Cameco Crow Butte Operation Dawes, Nebraska 1,000,000 Operating Operating Operating Operating Hydro Resources, Inc. Church Rock McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Hydro Resources, Inc. Crownpoint McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Lost Creek ISR, LLC, a subsidiary of Ur- Energy USA Inc. Lost Creek Project Sweetwater, Wyoming 2,000,000 Under Construction Under Construction

320

Work with Apple's Rhapsody Operating System which Allows Simultaneous UNIX Program Development, UNIX Program Execution, and PC Application Execution  

E-Print Network (OSTI)

Over the past decade, UNIX workstations have provided a very powerful program development environment. However, workstations are more expensive than PCs and Macintoshes and require a system manager for day-to-day tasks such as disk backup, adding users, and setting up print queues. Native commercial software for system maintenance and "PC applications" has been lacking under UNIX. Apple's new Rhapsody operating system puts the current MacOS on a NeXT UNIX foundation and adds an enhanced NeXTSTEP object oriented development environment called Yellow Box. Rhapsody simultaneously runs UNIX and commercial Macintosh applications such as word processing or spreadsheets. Thus a UNIX detector Monte Carlo can run for days in the background at the same time as a commercial word processing program. And commercial programs such as Dantz Retrospect are being made available to make disk backup easy under Rhapsody. Apple has announced that in 1999 they intend to be running Rhapsody, or MacOS X as it will be called in the commercial release, on all their newer computers. MacOS X may be of interest to those who have trouble hiring expert UNIX system managers; and to those who would prefer to have a single computer and operating system on their desktop that serves both the needs of UNIX program development and running commercial applications, simultaneously. We present our experiences running UNIX programs and Macintosh applications under the Rhapsody DR2 Developer Release.

Don Summers; Chris Riley; Lucien Cremaldi; David Sanders

2004-12-06T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

INTERNATIONAL UNION OF OPERATING ENGINEERS NATIONAL HAZMAT PROGRAM - EVOLUTION 180 CIRCULAR SAW OENHP: 2001-03, VERSION A  

SciTech Connect

Florida International University's (FIU) Hemispheric Center for Environmental Technology (HCET) evaluated five saws for their effectiveness in cutting specially prepared fiberglass-reinforced plywood crates. These crates were built as surrogates for crates that presently hold radioactively contaminated gloveboxes at the Department of Energy's (DOE) Los Alamos facility. The Evolution 180 circular saw was assessed on August 14, 2001. During the FIU test of efficacy, a team from the Operating Engineers National Hazmat Program (OENHP) evaluated the occupational safety and health issues associated with this technology. The Evolution 180 is a portable, metal cutting circular saw with a 7-inch diameter blade. The blade is contained within the main housing and has a retractable lower blade guard to prevent operator access to the blade during operation and shutdown. The saw is equipped with a chip collector. The maximum cutting thickness for metal is one-quarter inch and can cut steel tubing and pipe 2 inches in diameter. The unit is operated with an on/off guarded trigger switch and is supported with the hand guide mounted to the side of the saw. An adjustable lever sets the depth of the cut. The machine's circuitry will automatically shut the saw motor off if excessive overload is detected during operation. The one-half hour demonstration involved vertical and horizontal cuts and blade changes. During this process, operators experienced binding of the saw. This caused the blade to become hot, causing the sawdust collected in the chip collector to smoke. Care should be exercised to use the appropriate blade for the application, operator training, and personal protective equipment (PPE). Personal noise sampling indicated that neither worker was over the Occupational Safety and Health Administration's (OSHA) Action Level of 85 decibels (dBA) with time-weighted averages (TWA's) of 69.1 and 68.8 dBA. The personal noise sample taken during the special demonstration with the stainless steel plate had a TWA of 69.8 dBA. These data are not entirely representative as they were gathered during a simulation and not at the actual worksite. Additional sampling should be conducted on-site, but the workers should wear hearing protection until it is determined that it is no longer necessary. The total nuisance dust sample for the Evolution 180 circular saw was 3.5 milligrams per cubic meter (mg/m{sup 3}), which is lower than the OSHA Permissible Exposure Limit (PEL) of 15 mg/m{sup 3} and the American Conference of Governmental Industrial Hygienists' (ACGIH) Threshold Limit Value (TLV) of 10 mg/m{sup 3}. The fiber analysis yielded 1.74 fibers per cubic centimeter (f/cc), which is above the PEL of 1 f/cc. Although the nuisance dust levels were low, fiberglass dust levels were higher than the PEL. Since fiberglass dust is known to be a strong skin irritant and a possible human carcinogen, the workers should continue to wear appropriate suits and gloves, as well as a full-face air-purifying respirator. The respirator should be equipped with a combination organic vapor and acid gas cartridge in combination with a High Particulate Air (HEPA) filter, since particulate filter, since during the demonstration, the workers complained of an odd smell, which may have been from the breakdown of the fiberglass.

Unknown

2002-01-25T23:59:59.000Z

322

Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program  

SciTech Connect

Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

Goldstein, D.R.; Cressman, A.W.

1999-07-01T23:59:59.000Z

323

Industrial Assessment Centers Quarterly Update, Spring 2014 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Centers Quarterly Update, Spring 2014 Read the Industrial Assessment Centers (IAC) Quarterly Update -- Spring 2014 Industrial Assessment Centers (IAC) Quarterly Update...

324

Sandia National Laboratories is a multi-program laboratory operated by Sandia Co  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia National Laboratories is a multi-program laboratory operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Sandia National Laboratories is a multi-program laboratory operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin company, for the U.S. Department of Energy's National Nuclear Security Administration. With main facilities in Albuquerque, N.M., and Livermore, Calif., Sandia has major R&D responsibilities in national security, energy and environmental technologies and economic competitiveness. Annular Core Research Reactor Facility At the Annular Core Research Reactor (ACRR) facility, Sandia researchers can subject various test objects to a

325

Report on Inspection of the Performance Based Incentive Program at the Richland Operations Office, IG-0401  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(8-89) EFG (07-90) United States Government Department of Energy MEMORANDUM DATE: March 10, 1997 REPLY TO ATTN OF: IG-1 SUBJECT: INFORMATION: Report on "Inspection of the Performance Based Incentive Program at the Richland Operations Office" TO: The Acting Secretary BACKGROUND: The subject final report is provided for your information. While conducting other inspection work at the Richland Operations Office (Richland), the Office of Inspector General identified the Fiscal Year 1995 Richland Performance Based Incentive (PBI) Program as an area of concern. Specifically, we were unable to identify any

326

Summary of LLNL`s accomplishments for the FY93 Waste Processing Operations Program  

SciTech Connect

Under the US Department of Energy`s (DOE`s) Office of Technology Development (OTD)-Robotic Technology Development Program (RTDP), the Waste Processing Operations (WPO) Program was initiated in FY92 to address the development of automated material handling and automated chemical and physical processing systems for mixed wastes. The Program`s mission was to develop a strategy for the treatment of all DOE mixed, low-level, and transuranic wastes. As part of this mission, DOE`s Mixed Waste Integrated Program (MWIP) was charged with the development of innovative waste treatment technologies to surmount shortcomings of existing baseline systems. Current technology advancements and applications results from cooperation of private industry, educational institutions, and several national laboratories operated for DOE. This summary document presents the LLNL Environmental Restoration and Waste Management (ER and WM) Automation and Robotics Section`s contributions in support of DOE`s FY93 WPO Program. This document further describes the technological developments that were integrated in the 1993 Mixed Waste Operations (MWO) Demonstration held at SRTC in November 1993.

Grasz, E.; Domning, E.; Heggins, D.; Huber, L.; Hurd, R.; Martz, H.; Roberson, P.; Wilhelmsen, K.

1994-04-01T23:59:59.000Z

327

Basic MATLAB Programming MATLAB is a matrix-based language. Since operations may be  

E-Print Network (OSTI)

CHAPTER 11 Basic MATLAB Programming MATLAB is a matrix-based language. Since operations may(x,cos(x)) hold plot(x,sin(x)). (2) Plot the graph of exp(x) for x [-5, 10]. 3. Basic vector and matrix operations An n-dimensional vector u in MATLAB is a 1 ? n matrix, whose entries can be accessed by typing u

Lega, Joceline

328

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

4. U.S. uranium in-situ-leach plants by owner, location, capacity, and operating status" 4. U.S. uranium in-situ-leach plants by owner, location, capacity, and operating status" "In-Situ-Leach Plant Owner","In-Situ-Leach Plant Name","County, State (existing and planned locations)","Production Capacity (pounds U3O8 per year)","Operating Status at End of" ,,,,2012,"1st Quarter 2013","2nd Quarter 2013","3rd Quarter 2013" "Cameco","Crow Butte Operation","Dawes, Nebraska",1000000,"Operating","Operating","Operating","Operating" "Hydro Resources, Inc.","Church Rock","McKinley, New Mexico",1000000,"Partially Permitted And Licensed","Partially Permitted And Licensed","Partially Permitted And Licensed","Partially Permitted And Licensed"

329

Microsoft Word - Defense Science Quarterly Nov 2007 final.doc  

National Nuclear Security Administration (NNSA)

November 2007 November 2007 Dr. Brad Wallin Dr. Robert Hanrahan Defense Science Quarterly Inside This Issue 1 Message from the Director 2 Contributions of the Los Alamos Proton Radiography Program to the Nuclear Weapons Program 4 Contributions of the Los Alamos Weapons Neutron Research Facility Programs to the Nuclear Weapons Program 5 Cross-cutting Science: Materials in Extreme Environments 7 Academic Outreach: The Stewardship Science Academic Alliances Program 10 Z Refurbishment Project Wraps Up 11 Publication Highlights Chris Deeney, Director, Office of Defense Science Thank you for another exciting quarter in the Science Campaign. We recently visited Los Alamos and Sandia National Laboratories to conduct a technical review, and

330

Lessons Learned Quarterly Report, June 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1998 1998 Lessons Learned Quarterly Report, June 1998 Welcome to the second quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: NCO Meeting in DC The Role of the NCO Special Considerations in Applying Categorical Exclusions NEPA Training Anticipated DOE-wide NEPA Contracts Integrating NEPA with Other Reviews Advice from GC NRC Adopts DOE NEPA Documents at NEEL Alternative Dispute Resolution Clean Air Act Conformity Requirements Ecological Society Briefing NAPA Evaluates DOE NEPA Program NEPA Guidance Updates Litigation Updates Second Quarter FY98 Questionnaire Results EIS-related Documents Recent EIS Milestones EA Completion Times and Costs Lessons Learned Quarterly Report (LLQR) More Documents & Publications ADR Revised Policy

331

Lessons Learned Quarterly Report, September 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 1996 Lessons Learned Quarterly Report, September 1996 Lessons Learned Quarterly Report, September 1996 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: Defense Programs NCO Fosters Teamwork through Meetings Internal Scoping at Richland Visual Excellence Responding to Comments on DOE EISs Improving Comment Resolution with EPA EPA Commends DOE for "Model" Pollution Prevention Analysis Litigation Updates 1996 Federal Environmental Quality Award Winners: USACE and MMS Amended Rule Streamlines DOE NEPA Process Book Review: Environmental Impact Assessment Third quarter FY 1996 Lessons Learned Questionnaire results, including EIS and EA cost and time reports, and analysis models and codes used in DOE EAs and EISs

332

Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993  

SciTech Connect

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

Not Available

1993-07-01T23:59:59.000Z

333

Financial News for Major Energy Companies, Second Quarter 2006  

Gasoline and Diesel Fuel Update (EIA)

Second Quarter 2006 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or do not provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $30.1 billion on revenues of $297.1 billion during the second quarter of 2006 (Q206). The level of net income for Q206 was 36 percent higher than in the second quarter of 2005 (Q205) (Table 1). Net income for Q206 increased primarily as a result of higher crude oil

334

High flux isotope reactor: Quarterly report October through December 1986  

SciTech Connect

Two routine cycles of operation of the HFIR reactor were completed during the quarter. The shutdowns to end these cycles were both scheduled. The end-of-cycle 287 shutdown was extended indefinitely to investigate the embrittlement of reactor vessel materials due to radiation damage. The reactor remains down at the end of the quarter. Following the scheduled end-of-cycle 287 shutdown period, subsequent shutdown time was designated as unscheduled. The two scheduled shutdowns, fourth quarter downtime resulting from a third quarter scheduled shutdown, and the extended unscheduled shutdown account for the low 44.2% on-stream time for the quarter. The scheduled control plate replacement and vessel internals inspection was completed at the end-of-cycle 287. The inspection revealed a blister on control cylinder 9. This flaw was attributed to a manufacturing defect.

Corbett, B.L.; Farrar, M.B.

1987-04-01T23:59:59.000Z

335

Hydrologic resources management program and underground test area operable unit fy 1997  

SciTech Connect

This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

Smith, D. F., LLNL

1998-05-01T23:59:59.000Z

336

Quarterly Coal Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Report Quarterly Coal Report Release Date: October 02, 2013 | Next Release Date: December 2013 | full report Previous Quarterly Coal Data historical data (PDF): 1st quarter 2013 4th quarter 2012 3rd quarter 2012 2nd quarter 2012 1st quarter 2012 4th quarter 2011 3rd quarter 2011 2nd quarter 2011 1st quarter 2011 prior to 2011 Go The Quarterly Coal Report (QCR) provides detailed quarterly data on U.S. coal production, exports, imports, receipts, prices, consumption, quality, stocks, and refined coal. Data on U.S. coke production, consumption, stocks, imports, and exports are also provided. All data for 2011 and prior years are final. All data for 2012 and 2013 are preliminary. Highlights for second quarter 2013: U.S. coal production during second quarter 2013 totaled 243.1

337

Coal demonstration plants. Quarterly report, April-June 1979  

SciTech Connect

The objective of the US DOE demonstration program is to demonstrate and verify second-generation technologies and validate the economic, environmental and productive capacity of a near commercial-size plant by integrating and operating a modular unit using commercial size equipment. These facilities are the final stage in the RD and D process aimed at accelerating and reducing the risks of industrial process implementation. Under the DOE program, contracts for the design, construction, and operation of the demonstration plants are awarded through competitive procedures and are cost shared with the industrial partner. The conceptual design phase is funded by the government, with the detailed design, procurement, construction, and operation phases being co-funded between industry and the government. The government share of the cost involved for a demonstration plant depends on the plant size, location, and the desirability and risk of the process to be demonstrated. The various plants and programs are discussed: Description and status, funding, history, flowsheet and progress during the current quarter. (LTN)

None

1980-04-01T23:59:59.000Z

338

Semi-annual report of the Department of Energy, Operational Safety, Health and Environment Division, Quality Assessment Program  

SciTech Connect

This report presents the results from the analysis of the 32nd set of environmental quality assessment samples (QAP XXXII) that were received on or before June 5, 1990. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML's results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer. This is the 39th report of this program.

Sanderson, C.G.; Scarpitta, S.C.

1990-07-02T23:59:59.000Z

339

Catalytic multi-stage liquefaction of coal. Eleventh quarterly progress report, April 1, 1995--June 30, 1995  

SciTech Connect

This quarterly report covers the activities of Catalytic Multi-Stage Liquefaction of Coal during the Period April 1 - June 30, 1995, at Hydrocarbon Technologies, Inc. in Lawrenceville, New Jersey. This DOE Contract Period was from December 8, 1992 to December 7, 1994 and has been extended to September 30, 1995. The overall objective of this program is to produce liquid fuels from coal by direct liquefaction at a cost that is competitive with conventional fuels. Specifically, this continuous bench-scale program contains provisions to examine new ideas in areas such as: low temperature pretreatments, more effective catalysts, on-line hydrotreating, new coal feedstocks, other hydrogen sources, more concentrated coal feeds and other highly responsive process improvements while assessing the design and economics of the bench-scale results. This quarterly report covers work on Laboratory Scale Studies, Continuous Bench-Scale Operations, Technical Assessment and Project Management.

Comolli, A.G.; Johanson, E.S.; Lee, L.K. [and others

1995-10-01T23:59:59.000Z

340

Catalytic Multi-Stage Liquefaction of Coal. Second quarterly report, 1 January 1993--31 March 1993  

SciTech Connect

This quarterly report covers activities of Catalytic Multi-Stage Liquefaction of Coal during the period January 1--March 31, 1993, at Hydrocarbon Research, Inc. in Lawrenceville and Princeton, New Jersey. This DOE contract period is from December 8, 1992 to December 7, 1994. The overall objective of the program is to produce liquid fuels from direct coal liquefaction at a cost that is competitive with conventional fuels. Specifically, this continuous bench-scale program contains provisions to examine new ideas in areas such as: low temperature pretreatments, more effective catalysts, on-line hydrotreating, new coal feedstocks, other hydrogen sources, more concentrated coal feeds and other highly responsive process improvements while assessing the design and economics of bench-scale results. The quarterly report covers work on Laboratory Scale Studies, Continuous Bench-Scale Operations, Technical Assessment and Project Management.

Comolli, A.G.; Johanson, E.S.; Lee, L.K.; Pradhan, V.R.; Stalzer, R.H.

1993-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2007 (PDF), Facility Representative Program Performance 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by field elements quarterly per DOE-STD-1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to impove the FR Program. A summary of this quarter's data concluded: 74% Fully Qualified 94% Staffing Level ( last quarter was

342

4Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2006 (PDF), Facility Representative Program Performance 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 72% Fully Qualified ( last Quarter was

343

Short-term energy outlook quarterly projections. Third quarter 1997  

SciTech Connect

This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

NONE

1997-07-01T23:59:59.000Z

344

Lessons Learned Quarterly Report, March 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Welcome to the 34th quarterly report on lessons learned in the NEPA process. We are pleased to feature the synergy between NEPA and the new DOE Order 450.1, Environmental Protection Program. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: New DOE Order Focuses on EMS, Supports Basic NEPA Principles Few Comments Received on Proposed Floodplain/Wetlands Rule Changes China's Environmental Impact Assessment Law DOI/Forest Service Proposed Categorical Exclusions Potential Resources for NEPA Practitioners A View from the Trenches Fossil Energy Launches EIS Process Improvement Team CEQ Updates EIS Distribution Saves Yucca Mountain Project $200,000

345

Quarterly Journal of the Royal Meteorological Society Q. J. R. Meteorol. Soc. 00: 117 (0000) Impact of Non-Smooth Observation Operators on Variational  

E-Print Network (OSTI)

) Impact of Non-Smooth Observation Operators on Variational and Sequential Data Assimilation for a Limited-mail: jls07c@fsu.edu We investigate the issue of variational and sequential data assimilation with non & Overton, 2008) and (Karmitsa, 2007), we investigate minimization of the data assimilation cost functional

Navon, Michael

346

Quarterly Nuclear Power Deployment Scorecard - April 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Deployment Scorecard - April 2013 Power Deployment Scorecard - April 2013 Quarterly Nuclear Power Deployment Scorecard - April 2013 News Updates On November 20, 2012, the Department of Energy announced that it had selected the mPower America team, led by Babcock and Wilcox (B&W) partnered with Tennessee Valley Authority and Bechtel, as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. Negotiations with B&W are complete and the award is imminent. On March 11, 2013, the Department issued a follow-on solicitation open to other companies and manufacturers focused on furthering small modular reactor efficiency, operations and design. On January 10, 2013, NRC published the Final Environmental Impact Statement for the Enrico Fermi Unit 3 Combined License application. An

347

Audit of the Contractor Incentive Program at the Nevada Operations Office, IG-0412  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 1997 20, 1997 MEMORANDUM FOR THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Contractor Incentive Program at the Nevada Operations Office" BACKGROUND: The Department of Energy (Department) is using performance-based contracts to address problems associated with its traditional management and operating contracts. Under this approach, contractor performance is to be evaluated against performance measures which are clearly stated, results-oriented, and established prior to performance. The performance measures, which reflect the Department's expectations of the contractor, are the basis for rewarding superior contractor performance

348

Threat Insight Quarterly Regulatory Compliance  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Regulatory Compliance www.iss.netwww.iss.net October 2006 #12 Risk Index ..............................................11 Future X-Force Threat Insight Quarterly Internet Security Systems X-Force® Threat Insight Quarterly > October 2006 ©2006 Internet Security Systems

349

Threat Insight Quarterly Browser Exploitation  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Browser Exploitation www.iss.netwww.iss.net January 2007 #12 . . . . . . . . . . . . . . . . . . . . . . . . 11 Previous X-Force Threat Insight Quarterly Topics . . . . . . . . . . 15 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Contents IBM Internet Security Systems X-Force® Threat Insight Quarterly > January 2007

350

Direct numerical technique of mathematical programming for optimal control of Xenon oscillation in load following operation  

SciTech Connect

A simple core control code is developed for the control of a nuclear reactor in the load following operation. The core state equations are described by the one-group diffusion equation with moderator temperuture and xenon feedbacks and iodine-xenon dynamics equations. The control via control rod, boron, and coolant inlet temperature is considered. To avoid the conventional difficulties of a two-point boundary value problem, the optimal control problem is solved by the direct numerical technique of the mathematical programming without the separation of space and time variables. This quadratic programming problem is solved by the Davidon-Fletcher-Powell method, which is a general unconstrained optimization method. In the cases of the load following operation of Korea Nuclear Units 7 and 8, the results obtained by using the present model show that the scheduled load demand is successfully followed, and the power distribution maintains the desired distribution with a minimum amount of control action.

Yoon, M.H.; No, H.C.

1985-06-01T23:59:59.000Z

351

Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the of the Employee Concerns Program at the Savannah River Operations Office May 2011 February 2013 July 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope and Methodology ......................................................................................................................... 2 4.0 Results .................................................................................................................................................... 2

352

Development of a synthetic fuel reciprocating charge pump. Quarterly technical progress report for the period of: 1 January 1987--31 March 1987  

SciTech Connect

This report covers the third quarter of the third phase of the reciprocating charge pump improvement program. The program was begun in 1982 for the purpose of improving the operating life of packings and plungers used in 300 psig, 300F coal/solvent slurry pumps employed in synthetic fuel generating plants. The testing to be performed during this phase has been modified since the last quarterly report. This test measured the effects of slurry migration past the floating piston seal and the time to wear the packing and plunger beyond the acceptable limit. Table 1 summarizes all testing to date, 456 hours total at this time with 72 hours on 35% slurry. It denotes the valve problems seen with rapid pressure decay when pumping slurry. Throughout this time, 33 specific and different equipment failures and operation problems occurred that delayed the testing.

Bonney, G.E.

1987-12-31T23:59:59.000Z

353

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

June 2010 DOE/EIA-0121 (2010/01Q) June 2010 DOE/EIA-0121 (2010/01Q) Revised: July 2012 Quarterly Coal Report January - March 2010 June 2010 U.S. Energy Information Administration Office of Oil, Gas, and Coal Supply Statistics U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.gov/coal/production/quarterly/ _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of

354

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Quarterly Coal Report January - March 2008 July 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

355

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2009 September 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

356

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

7/01Q) 7/01Q) Quarterly Coal Report January - March 2007 June 2007 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

357

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2008 December 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

358

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2008 September 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

359

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

8/04Q) 8/04Q) Quarterly Coal Report October - December 2008 March 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

360

Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994  

SciTech Connect

The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

Not Available

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Mitigation Monitoring and Reporting Program for continued operation of Lawrence Livermore National Laboratory  

SciTech Connect

A Mitigation Monitoring and Reporting Program, required by the California Environmental Quality Act, was developed by UC as part of the Final EIS/EIR process. This document describing the program is a companion to the Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). The Final EIS/EIR analyzes the potential environmental impacts of the proposed action, which for the purposes of NEPA is: continued operation, including near-term (within 5 to 1 0 years) proposed projects, of LLNL and SNL, Livermore. The proposed action for the EIR is the renewal of the contract between DOE and UC for UC`s continued operation and management of LLNL. The Mitigation Monitoring and Reporting Program is for implementing and monitoring progress of measures taken to mitigate the significant impacts of the proposed action. A complete description of the impacts and proposed mitigations is in Section 5 of Volume I of the Final EIS/EIR. This report summarizes the mitigation measures, identifies the responsible party at the Laboratory for implementing the mitigation measure, states when monitoring will be implemented, when the mitigation measure will be in place and monitoring completed, and who will verify that the mitigation measure was implemented.

Not Available

1992-08-01T23:59:59.000Z

362

Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 Occurrence Reporting and Processing of Operations Information requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

Lisbeth A. Mitchell

2013-11-01T23:59:59.000Z

363

Catalytic multi-stage liquefaction of coal. Sixth quarterly report, 1 January 1994--31 March 1994  

SciTech Connect

The overall objective of this program is to produce liquid fuels from coal by direct liquefaction at a cost that is competitive with conventional fuels. Specifically, this continuous bench-scale program contains provisions to examine new ideas in areas such as low temperature pretreatments, more effective catalysts, on-line hydrotreating, new coal feedstocks, other hydrogen sources, more concentrated coal feeds and other highly responsive process improvements while assessing the design and economics of the bench-scale results. This quarterly report covers work on Laboratory Scale Studies, Continuous Bench-Scale Operations, Technical Assessment and Project Management.

Comolli, A.G.; Lee, L.K.; Pradhan, V.R.; Stalzer, R.H.

1994-05-01T23:59:59.000Z

364

Catalytic multi-stage liquefaction of coal twelth quarterly report for the period 1 July 1995--30 September 1995  

SciTech Connect

The overall objective of this program is to produce liquid fuels from coal by direct liquefaction at a cost that is competitive with conventional fuels. Specifically, this continuous bench-scale program contains provisions to examine new ideas in areas such as: low temperature pretreatments, more effective catalysts, on-line hydrotreating, new coal feedstocks, other hydrogen sources, more concentrated coal feeds and other highly responsive process improvements while assessing the design and economics of the bench- scale results. This quarterly report covers work on Laboratory Scale Studies, Continuous Bench-Scale Operations, Technical Assessment and Project Management.

Comolli, A.G.; Johanson, E.S.; Lee, L.K.; Pradhan, V.R.; Stalzer, R.H.

1995-12-01T23:59:59.000Z

365

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

SciTech Connect

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

366

Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, April 1995--June 1995  

SciTech Connect

Progress is described on the determination of environmental impacts from waste discharges to the aquatic ecosystems from oil and gas operations. Task 2 (Preparation of the Sampling and Analysis Plan) activities involved revisions and additions to the Sampling and Analysis Plan. Task 3 (Environmental Field Sampling and Analysis of NORM, Heavy Metals, and Organics) work included analyses of water, sediment, and tissue samples as well as data management. Task 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities involved the continued analyses of samples and conducting field sampling at Bay de Chene. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) activities included preparing a draft final report and review by the Scientific Review Committee (SRC). Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) work involved the preparation of the draft final report and review by the SRC. Task 7 (Technology Transfer Plan) activities involved the presentation of four papers. Task 8 (Project Management and Deliverables) activities involved the submission of the necessary reports and routine management.

Gettleson, D.A.

1995-07-31T23:59:59.000Z

367

Priority Based Reservoir Optimization using Linear Programming: Application to Flood Operation of the Iowa/Des Moines River System  

E-Print Network (OSTI)

for preservation of selected operating priorities and the effect that operating constraints have on systemPriority Based Reservoir Optimization using Linear Programming: Application to Flood Operation of the Iowa/Des Moines River System By MATTHEW JASON BROWN B.S. (The Pennsylvania State University) 1995

Lund, Jay R.

368

Environmental and economic assessment of discharges from Gulf of Mexico Region oil and gas operation. Quarterly technical progress report, 1 October--31 December 1994  

SciTech Connect

Task 3 (Environmental Field Sampling and Analysis of NORM, Heavy Metals, and Organics) work included analyses of samples. Task 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities involved the continued analyses of samples and field sampling at Bay de Chene. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) activities included preparing a draft final report. Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) work also involved preparing a draft final report. Task 7 (Technology Transfer Plan) activities included a presentation at the Minerals Management Service Information Transfer Meeting for the Gulf of Mexico OCS Region. Task 8 (Project Management and Deliverables) activities involved the submission of the necessary reports and routine management.

Gettleson, D.A.

1995-01-18T23:59:59.000Z

369

A quarterly and Central  

E-Print Network (OSTI)

A quarterly report on employment and office markets in Northern and Central New Jersey May 2008- plications for the state's office markets. This year has every indication of being a very difficult capacity. Along with the ongoing Portfields Initiative project, the Port of New York and New Jersey

370

Microsoft PowerPoint - quarterly_1040311.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Review March 11, 2004 C Mod Alcator - C Mod Alcator - Agenda * Status of JOULE milestones and quarterly sub- milestones (due March 31, 2004) - Comparison of single-null, double-null, inner-wall- limited ... (Marmar) - Design of ICRF antenna (Marmar) - Research operation weeks (Irby) * Lower hybrid status (Irby) * Operations plans (Irby) * Recent 2-frequency ITB results (Marmar) C Mod Alcator - JOULE Milestone SC6-1b * Compare energy confinement, H-Mode thresholds, and diverter particle dynamics in single-null, double-null and inner-wall-limited discharges ... - Quarterly sub-milestone: assess energy confinement in double-null discharges (March 31, 2004) * Status - Runs taken to compare single-null and double-null confinement - First limiter H-modes achieved (both lower nose and inner-wall limited), thresholds measured

371

Semi-annual report of the Department of Energy, Operational Safety, Health and Environment Division: Quality assessment program  

SciTech Connect

This report presents the results from the analysis of the 28th set of environmental quality assessment samples (QAP XXVIII) that were received on or before June 7, 1988. This Quality Assessment Program (QAP) is designed to test the Quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed, at first Quarterly and then semiannually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML's results and are reported back to the participation contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer.

Sanderson, C.G.; Feiner, M.S.

1988-07-01T23:59:59.000Z

372

Semi-annual report of the Department of Energy, Operational Safety, Health and Environment Division: Quality assessment program  

SciTech Connect

This report presents the results from the analysis of the 27th set of environmental quality assessment samples (QAP XXVII) that were received on or before December 3, 1987. This Quality Assessment Program (QAP) is designed to test the Quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed, at first Quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML's results and are reported back to the participation contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer.

Sanderson, C.G.; Feiner, M.S.

1988-01-04T23:59:59.000Z

373

Environmental and economic assessment of discharges from Gulf of Mexico Region Oil and Gas Operations. Quarterly technical progress report, January 1, 1994--March 31, 1994  

SciTech Connect

The primary objectives of the project are to increase the base of scientific knowledge concerning (1) the fate and environmental effects of organics, trace metals, and NORM in water, sediment, and biota near several offshore oil and gas facilities; (2) the characteristics of produced water and produced sand discharges as they pertain to organics, trace metals, and NORM variably found in association with the discharges; (3) the recovery of four terminated produced water discharge sites located in wetland and high-energy open bay sites of coastal Louisiana and Texas; (4) the economic and energy supply impacts of existing and anticipated federal and state offshore and coastal discharge regulations; and (5) the catch, consumption and human use patterns of seafood species collected from coastal and offshore waters. The products of the effort will be a series of technical reports detailing the study procedures, results, and conclusions which contribute to the transfer of technology to the scientific community, petroleum industry, and state and federal programs.

Gettleson, D.A.

1994-04-21T23:59:59.000Z

374

Medical and Health Divisions quarterly report, July, August, September, 1948  

SciTech Connect

This quarterly report describes progress in four programs entitled (1) The Metabolic Properties of Plutonium and Allied Materials, (2) Biological Studies of Radiation Effects, (3) Biological Effects of Radiation from External and Internal Sources and (4) Health Chemistry and Physics. Progress in each program is separately indexed and abstracted for the database.

NONE

1995-11-01T23:59:59.000Z

375

Environmental and economic assessment of discharges from Gulf of Mexico Region Oil and Gas Operations. Quarterly technical progress report, 1 October--31 December 1993  

SciTech Connect

Task 2 (Preparation of the Sampling and Analysis Plan) activities involved the incorporation of the offshore site selection process into the Sampling and Analysis Plan. Task 3 (Environmental Field Sampling and Analysis of NORM, Heavy Metals, and Organics) work included making decisions on tissue analyses and performing analyses of water and sediment samples. Task 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities involved the completion of the spring benthos samples collection on pre-termination samples at Four Isle Dome and the first post-termination samples at Delacroix Island. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gum of Mexico Region) activities included continued work on development of a base case production forecast, modeling future production, and determining economic impact of treatment technologies. Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) work involved the completion of the fall survey season and the initiation of the survey data assembly. Task 7 (Technology Transfer Plan) activities included presentations at the Society of Environmental Toxicology and Chemistry annual meeting and Minerals Management Service Information Transfer Meeting. Task 8 (Project Management and Deliverables) activities involved the submission of the necessary reports and routine management.

Gettleson, D.A.

1994-01-28T23:59:59.000Z

376

Lessons Learned Quarterly Report, December 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2002 Lessons Learned Quarterly Report, December 2002 Lessons Learned Quarterly Report, December 2002 Welcome to the 33rd quarterly report on lessons learned in the NEPA process. Have you noticed that NEPA has been in the news a lot lately? Although this issue of LLQR is longer than usual, I encourage you to read all the news, views, and lessons learned. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: CEQ Asks How to Improve NEPA Implementation; Responses Vary Widely DOE Cooperating Agency Report DOE Proposes Floodplain/Wetland Rule Revisions Adaptive Management and the NEPA Process Impact Mitigation at Los Alamos Institute Establishes NEPA Advisory Committee Office of Science Promotes Early NEPA Planning

377

Lessons Learned Quarterly Report, June 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, June 2004 Welcome to the 39th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Articles included in this issue: "Open House" Format for Scoping Meetings Provides DOE Valuable Input for Yucca Rail EIS Lesson Learned from Lessons Learned Apply Common Sense: Reduce Unfamilar Abbreviations Carbon Sequestration Programmatic EIS The Libyan Connection: Emergency Action Needed NEPA Strategy Adjusts to Changing Circumstances Card Game Highlights Diversity at NEPA Clinic

378

Lessons Learned Quarterly Report, September 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2004 Lessons Learned Quarterly Report, September 2004 Lessons Learned Quarterly Report, September 2004 Welcome to the 40th quarterly report on lessons learned in the NEPA process. That's 40 issues! Have you read them all? We are pleased to feature the July 2004 NEPA Community Meeting in this issue, as well as our annual update of the cumulative index to LLQR. Thank you for your continuing support. Articles included in this issue: DOE's NEPA Process - Getting Better and Better NEPA Community Meeting Highlights Awards for Contributions to DOE's NEPA Program Working with Cooperating Agencies e-NEPA Improves Access and Efficiency Getting Better Through Guidance More Thoughts on Getting Better and Better NEPA Office Shares Best Practices Lessons Learned from Lessons Learned Part 4

379

Lessons Learned Quarterly Report, March 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2007 Lessons Learned Quarterly Report, March 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the NEPA process. The Office began by presenting cost and time metrics and "What Worked and What Didn't Work." Other features were soon introduced. As always, we hope you read all of LLQR, and we welcome your suggestions for further improvement. Articles included in this issue: Flexibility of NEPA Process Facilitates Decisions for Strategic Petroleum Reserve Expansion DOE Cooperating Agency Report to CEQ GNEP PEIS to Examine Nuclear Fuel Recycling Proposal

380

Lessons Learned Quarterly Report, June 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2008 Lessons Learned Quarterly Report, June 2008 Lessons Learned Quarterly Report, June 2008 Welcome to the 55th quarterly report on lessons learned in the NEPA process. We are pleased to feature the recent NAEP conference, Changing Climates, thanks to our on-the-scene reporter Carolyn Osborne. There are also several articles related to global climate change and NEPA. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for further improvement. Articles included in this issue: Old NEPA Tools Still Work in a "Changing Climate" September Meeting: Making NEPA Work for DOE Strategic Petroleum Reserve Scoping Underappreciated Provisions of the CEQ Regulations CEQ Interagency Work Groups Make Progress

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lessons Learned Quarterly Report, June 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Welcome to the 59th quarterly report on lessons learned in the NEPA process. We are pleased to feature the DOE NCO meeting and the NAEP annual conference, where streamlining the NEPA process for Recovery Act projects and consideration of climate change in NEPA documents were both addressed. We've begun to follow up on suggestions from the NCO meeting (below). Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NEPA Compliance Officers Share Strategies 2009 NCO Meeting: Expediting a Quality NEPA Process Expedite Schedule and Maintain Quality Preparing Focused, Concise EAs

382

Lessons Learned Quarterly Report, September 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2003 Lessons Learned Quarterly Report, September 2003 Lessons Learned Quarterly Report, September 2003 Welcome to the 36th quarterly report on lessons learned in the NEPA process. We are pleased to feature the July 2003 NEPA Community Meeting in this issue. Also, please note that the cumulative index, a useful reference tool, is printed in this issue. Thank you for your continuing support of the Lessons Learned program. Included in this issue: DOE NEPA Community Gauges Progress In Its Continuing Pursuit of Excellence Floodplain and Wetland Regulations Effective September 26, 2003 NEPA Community Meeting Highlights Metrics Show Progress In Meeting Goals Getting from Here to There Lessons Learned Along the Way e-Government Approaches to EIS Distribution Procedures Evolving for Sensitive Information

383

Lessons Learned Quarterly Report, September 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Welcome to the 60th quarterly report on lessons learned in the NEPA process. We are pleased to feature the extraordinary support provided by our NCO volunteers and to introduce Scott Blake Harris, DOE General Counsel, and his plans for improving the DOE NEPA process. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NCO Volunteers Lend a Hand To Expedite Recovery Act Projects DOE General Counsel Scott Blake Harris Aims To Improve the NEPA Review Process CEQ Report to Congress on Recovery Act DOE Grants NEPA Variances for Two Solicitations Introducing DOE's New General Counsel

384

Lessons Learned Quarterly Report, March 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2010 Lessons Learned Quarterly Report, March 2010 Lessons Learned Quarterly Report, March 2010 Welcome to the 62nd quarterly report on lessons learned in the NEPA process. In this issue, we start a year-long observance of the 40th anniversary of the National Environmental Policy Act. The occasion calls for celebration of NEPA's successes as well as reflection on opportunities for improvement. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: CEQ Celebrates NEPA at 40. . . and So Do We! DOE Launches Categorical Exclusion Database Celebrating 40 Years with NEPA CEQ Issues Draft NEPA Guidance CEQ NEPA Symposium Presidential Proclamation Reflections: Professor Mandelker

385

Lessons Learned Quarterly Report, March 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Welcome to the 38th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Included in this issue: New, Improved "Green Book" Is on the Way Modern Pit Facility Final EIS Delayed NNSA Withdraws FONSI for LANL Biosafety Lab BLM Programmatic EIS On Wind Energy Lesson Learned about Schedule and Teamwork CEQ Chair Emphasizes NEPA's "Productive Harmony" Goal Supporting Flexible Decisionmaking in Practice NEPA Champions Brief Congressional Staff

386

Natural gas: Imports and exports third quarter report 1993  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies with authorizations to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the third quarter of 1993 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months (October 1992--September 1993). Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

Not Available

1993-12-31T23:59:59.000Z

387

Lessons Learned Quarterly Report, June 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2003 Lessons Learned Quarterly Report, June 2003 Lessons Learned Quarterly Report, June 2003 Welcome to the 35th quarterly report on lessons learned in the NEPA process. We are pleased to include in this issue three new mini-guidance articles. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: Responding to Comments Is Work, But It Makes the NEPA Process Work DOE NEPA Meeting in July Mini-guidance: Multiple RODs Offer Flexibility Effective and Efficient EIS Distribution Keep the Public Informed When EIS Plans Change DOE Updates Public Participation Policy Observations on Annual NEPA Planning Summaries DOE-Wide NEPA Contracts Guidance Issued Not Meeting CAA Requirements Can Cause Delays Floodplain and Wetland Regulations Update

388

Lessons Learned Quarterly Report, September 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Welcome to the 28th quarterly report on lessons learned in the NEPA process. This completes our seventh year of providing performance metrics, news, and guidance to the DOE NEPA Community. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Compliance Officers Consider Further Improvements NCO Meeting Federal/State/Tribal Coordination Forest Fire; Forest Preserved View From EPA Streamlining Approvals of Energy Projects NEPA Pilot Projects to Demonstrate Mediation DOE-wide NEPA Contracting Executive Order on Migratory Birds FERC Outreach for Natural Gas Approvals Life-Cycle Assessment for "Green" Projects

389

Waste Management Program. Technical progress report, Aporil-June 1983  

SciTech Connect

This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

None

1984-02-01T23:59:59.000Z

390

Innovative pollution prevention program at Air Force owned Raytheon operated facility incorporating Russian technology  

SciTech Connect

Air Force Plant 44 in Tucson, Arizona is owned by the Air Force and operated by Raytheon Missile Systems Company. A joint Air Force/Raytheon Pollution Prevention Team operates at AFP 44 with the ultimate goal to minimize or eliminate the use of hazardous substances. The team works together to uncover new technologies and methods that will replace chemicals used in the plant's missile manufacturing facilities. The program maximizes pollution prevention by first eliminating hazardous material use, then chemical recycling, next hazardous waste reduction and finally wastewater treatment and recycling. From fiscal years 1994 through 1997, nine pollution prevention projects have been implemented, totaling $2.6 million, with a payback averaging less than two years. A unique wastewater treatment method has been demonstrated as part of this program. This is electroflotation, a Russian technology which removes dispersed particles from liquid with gas bubbles obtained during water electrolysis. A unit was built in the US which successfully removed organic emulsions from wastewater. Operational units are planned for the removal of waste from waterfall paint booths. The pollution prevention joint team continues to be very active with two projects underway in FY 98 and two more funded for FY 99.

Stallings, J.H.; Cepeda-Calderon, S.

1999-07-01T23:59:59.000Z

391

Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 2  

SciTech Connect

This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities. This Part 2 includes chapters on implementation guidance for operational configuration management, implementation guidance for design reconstitution, and implementation guidance for material condition and aging management. Appendices are included on design control, examples of design information, conduct of walkdowns, and content of design information summaries.

Not Available

1993-11-01T23:59:59.000Z

392

Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, April--June 1993  

SciTech Connect

Continental Shelf Associates, Inc. (CSA) was contracted to conduct a three-year study of the environmental and health related impacts of produced water and sand discharges from oil and gas operations. Data on naturally occurring radioactive materials (NORM), heavy metals, and hydrocarbons in water, sediment, and biota will be collected and evaluated. Health related impacts will be studied through field collections and analyses of commercially- and recreationally-important fish and shellfish tissues. Additionally, information on seafood catch, consumption, and use patterns for the Gulf of Mexico will be gathered and analyzed. The facilities to be studied will include both offshore and coastal facilities in the Gulf of Mexico. Coastal sites will be additionally studied to determine ecological recovery of impacted wetland and open bay areas. The economic impact of existing and proposed effluent federal and state regulations will also be evaluated. The primary objectives of the project are to increase the base of scientific knowledge concerning (1) the fate and environmental effects of organics, trace metals, and NORM in water, sediment, and biota near several offshore oil and gas facilities; (2) the characteristics of produced water and produced sand discharges as they pertain to organics, trace metals, and NORM variably found in association with the discharges; (3) the recovery of four terminated produced water discharge sites located in wetland and high-energy open bay sites of coastal Louisiana and Texas; (4) the economic and energy supply impacts of existing and anticipated federal and state offshore and coastal discharge regulations; and (5) the catch, consumption and human use patterns of seafood species collected from coastal and offshore waters. Accomplishments for this period are described.

Gettleson, D.A.

1993-07-26T23:59:59.000Z

393

Environmental and economic assessment of discharges from Gulf of Mexico Region oil and gas operations. Quarterly technical progress report, 1 October--31 December 1992  

SciTech Connect

Tasks 3 (Environmental Field Sampling and Analysis of naturally occurring radioactive materials (NORM), Heavy Metals, and Organics) and 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities have included the narrowing of the list of potential offshore platforms for study off Louisiana and Texas and a preliminary selection of three coastal sites in Louisiana. After an extensive search effort, it was concluded that no coastal sites are available in Texas. A meeting was held between the contractor, Department of Energy (DOE), and Brookhaven National Laboratory (BNL) personnel to discuss potential sites and sampling designs. A letter was sent to the Scientific Review Committee (SRC) providing a general description of the revised site selection process and sampling designs. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) activities included continued evaluation of data types available for the economic analysis. Historical field basis data were acquired. The identification of permitted discharge points was also initiated. Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) activities have involved the completion of the literature review. Drafts of the fisherman and wholesaler surveys were prepared. It was determined with DOE and BNL personnel that the retailer survey would be eliminated and a subsistence fisherman survey would be added. Task 7 (Technology Transfer Plan) work has been delayed due to the Tasks 3 and 4 delay and cancellation of the annual US Minerals Management Service (MMS) Gulf of Mexico Region Information Transfer Meeting. Task 8 (Project Management and Deliverables) activities have involved the submission of the necessary reports and routine management.

Gettleson, D.A.

1993-01-18T23:59:59.000Z

394

Process hazards analysis (PrHA) program, bridging accident analyses and operational safety  

SciTech Connect

Recently the Final Safety Analysis Report (FSAR) for the Plutonium Facility at Los Alamos National Laboratory, Technical Area 55 (TA-55) was revised and submitted to the US. Department of Energy (DOE). As a part of this effort, over seventy Process Hazards Analyses (PrHAs) were written and/or revised over the six years prior to the FSAR revision. TA-55 is a research, development, and production nuclear facility that primarily supports US. defense and space programs. Nuclear fuels and material research; material recovery, refining and analyses; and the casting, machining and fabrication of plutonium components are some of the activities conducted at TA-35. These operations involve a wide variety of industrial, chemical and nuclear hazards. Operational personnel along with safety analysts work as a team to prepare the PrHA. PrHAs describe the process; identi fy the hazards; and analyze hazards including determining hazard scenarios, their likelihood, and consequences. In addition, the interaction of the process to facility systems, structures and operational specific protective features are part of the PrHA. This information is rolled-up to determine bounding accidents and mitigating systems and structures. Further detailed accident analysis is performed for the bounding accidents and included in the FSAR. The FSAR is part of the Documented Safety Analysis (DSA) that defines the safety envelope for all facility operations in order to protect the worker, the public, and the environment. The DSA is in compliance with the US. Code of Federal Regulations, 10 CFR 830, Nuclear Safety Management and is approved by DOE. The DSA sets forth the bounding conditions necessary for the safe operation for the facility and is essentially a 'license to operate.' Safely of day-to-day operations is based on Hazard Control Plans (HCPs). Hazards are initially identified in the PrI-IA for the specific operation and act as input to the HCP. Specific protective features important to worker safety are incorporated so the worker can readily identify the safety parameters of the their work. System safety tools such as Preliminary Hazard Analysis, What-If Analysis, Hazard and Operability Analysis as well as other techniques as necessary provide the groundwork for both determining bounding conditions for facility safety, operational safety, and day-to-clay worker safety.

Richardson, J. A. (Jeanne A.); McKernan, S. A. (Stuart A.); Vigil, M. J. (Michael J.)

2003-01-01T23:59:59.000Z

395

DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-93-Pt.2 3-93-Pt.2 November 1993 DOE STANDARD GUIDE FOR OPERATIONAL CONFIGURATION MANAGEMENT PROGRAM Including the Adjunct Programs of Design Reconstitution and Material Condition and Aging Management PART ll U.S. Department of Energy AREA CMAN Washington, D.C. 20585 DISTRIBUTION STATEMENT A: Approved for public release; distribution Is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161. Order No. DE94005408 i CONTENTS FOREWORD .

396

DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85 85 CHAPTER 4 IMPLEMENTATION GUIDANCE FOR MATERIAL CONDITION AND AGING MANAGEMENT This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. As shown in Figure 4-1, Material Condition and Aging Management (MCA) activities are developed and implemented in three distinct phases: a preliminary phase, a detailed or main phase, and an ongoing phase. The preliminary MCA phase includes activities necessary to estimate the facility remaining lifetime and to develop the MCA program plan. The detailed MCA phase builds on the preliminary estimate of facility remaining lifetime with more rigorous evaluations of aging degradation mechanisms

397

Microsoft Word - HPO PCAR Quarterly Report 2013 2Q rev.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012 This report serves as an official record of the quarterly cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Page 1 of 2 Fiscal Years (FY) 2012 - 2016: Reporting Period: Second Quarter, FY2013 I. MANAGEMENT EXCELLENCE GOALS Cutting Waste (Improving Efficiency) 1. Limit Program Direction increases to levels allowed by OMB for inflation. 2. Comply with OMB guidance, OMB-M-12-12, Promoting Efficient Spending, regarding mission- related travel. Quarterly Cost Report Funded

398

U.S. Energy Information Administration | Quarterly Coal Distribution...  

Annual Energy Outlook 2012 (EIA)

1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2014 Alabama ...

399

EMSL Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

th Quarter, Fiscal Year 2008 th Quarter, Fiscal Year 2008 (July 1, 2008, through September 30, 2008) DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by

400

High Hopes, Tight Quarters  

NLE Websites -- All DOE Office Websites (Extended Search)

Hopes, Hopes, Tight Quarters Unique Recycler, world's largest array of permanent magnets, taking shape in crowded Main Injector tunnel. by Mike Perricone, Office of Public Affairs The magnets are numbered in the hundreds; their weight is measured in tons. The available space in the tunnel is usually about four and a half feet, but it can be as little as two or three inches, and the forklifts doing the moving have been custom- designed for these tight quarters. The obstacles include water systems, cable trays, workers performing other installations, and the precisely aligned components of the signature Main Injector accelerator. The consequences of a possible slip-up: Don't even ask. Installation crews can put eight to 10 magnets in place in a day, if the magnets are located close together. Installing a magnet

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Fourth Quarter FY 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2009 1 December 2009 1 Fourth Quarter FY 2009 December 1, 2009; Issue No. 61 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 8) DOE Begins Online Posting of Categorical Exclusion Determinations The Department of Energy (DOE) is now posting most of its categorical exclusion (CX) determinations on the web under a policy that went into effect November 2, 2009. In establishing the policy, Deputy Secretary Daniel B. Poneman referred to President Obama's commitment to "creating an unprecedented level of openness in Government," including by posting information online. "Such openness is especially important when the information relates to the Department's

402

NEPA Lessons Learned Quarterly Report December 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 2000 December 1, 2000; Issue No. 25 DOE NEPA Order Revised, National Nuclear Security Administration Responsibilities Outlined On October 26, 2000, the Deputy Secretary of Energy issued DOE O 451.1B, National Environmental Policy Act Compliance Program, to accommodate National Nuclear Security Administration (NNSA) NEPA responsibilities. The revised Order has an expanded section on applicability and a new section on NNSA procedures. With respect to an EIS for an NNSA activity, the NNSA Administrator will fulfill the responsibilities of a Secretarial Officer (including consulting with the NNSA General Counsel), and the Secretary or Deputy

403

Strategic petroleum reserve, quarterly report  

SciTech Connect

As of December 31, 1981, the cumulative fill capability for the storage of crude oil for the SPR was 257 million barrels. Development of Phase I of the program consisting of 250 million barrels of capacity is complete and development of Phase II, consisting of 290 million barrels of capacity, is continuing. During 1981, the design of Phase III commenced. Phase III will increase the SPR capacity by 210 million barrels. The cumulative fill capability is expected to be 750 million barrels by 1990. The SPR was filled at a rate of 338,391 barrels per day during the last quarter of 1981, and had a total of 230.3 million barrels of oil in storage at the end of 1981. The Department of Energy has aggressively pursued oil purchases during 1981 in order to take advantage of the favorable international oil market. A long-term commercial contract was signed on August 20, 1981, with Petroleos Mexicanos (PEMEX), Mexico's state-owned oil company, for purchase of 110 million barrels of crude oil through 1986. The contract provided for the SPR to purchase 24 million barrels between September 1, 1981, and December 31, 1981. Thereafter PEMEX will supply crude oil to the SPR at the rate of 50,000 barrels a day through August 31, 1986. In addition, under the terms of a settlement of an overcharge allegation, Chevron USA agreed to supply 1,029,000 barrels of oil to the Reserve without cost. Deliveries under this settlement were completed in January 1982. The Omnibus Budget Reconciliation Act also requires the Secretary of the Treasury to establish an account to be known as the SPR Petroleum Account which may be obligated for the acquisition, transportation, and injection of petroleum products into the SPR. For FY 1982, Congress appropriated $3.7 billion to this account. The amount of funds obligated from the SPR Petroleum Account during the first quarter FY 1982 ending December 31, 1981, was $2056 million.

Not Available

1982-02-16T23:59:59.000Z

404

Lessons Learned Quarterly Report, June 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Lessons Learned Quarterly Report, June 2011 Welcome to the 67th quarterly report on lessons learned in the NEPA process. This issue showcases BPA's mitigation and monitoring activities and best practices of DOE Program and Field Offices for efficiently preparing NEPA documents, involving the public, and making a difference in the quality of environmental protection. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: Bonneville's "Balanced Scorecard" Approach to Mitigation, Monitoring, and Adaptive Management Make Reference Documents Available Online Promoting NEPA Transparency and Public Engagement "Sunshine Week" Symposium DOE Evaluating NEPA Compliance in Audits

405

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

Not Available

1990-08-15T23:59:59.000Z

406

Financial News for Major Energy Producers, Third Quarter 2010  

Gasoline and Diesel Fuel Update (EIA)

Producers, Third Quarter 2010 Producers, Third Quarter 2010 Release Date: January 5, 2011 Next Release Date: To Be Determined Report Sections: Corporate and Petroleum Net Income Worldwide Oil and Gas Production Operations Worldwide Refining/Marketing Operations Worldwide Petroleum Capital Expenditures Worldwide Downstream Natural Gas and Power, and Chemicals Operations Supplemental Figures Supplemental Tables Download this Report: Full Report in PDF-Format Past Issues in PDF-Format Additional Information FRS Home Financial Terms Glossary Contacts Notes: The "Financial News for Major Energy Producers" is issued quarterly to report recent trends in the financial performance of the major energy producers. "Major energy producers" are respondents to Form EIA-28 (Financial Reporting System). All U.S.-based respondent companies that

407

Quarterly Nuclear Deployment Scorecard - January 2014 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 News Updates Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US-APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension. Unistar Nuclear Operating Co. has formally withdrawn its COL application from the Nuclear Regulatory Commission (NRC) to build and operate Areva's U.S. EPR at its Nine Mile Point site in Oswego, NY. In

408

Field Operations Program Chevrolet S-10 (Lead-Acid) Accelerated Reliability Testing - Final Report  

SciTech Connect

This report summarizes the Accelerated Reliability testing of five lead-acid battery-equipped Chevrolet S-10 electric vehicles by the US Department of Energy's Field Operations Program and the Program's testing partners, Electric Transportation Applications (ETA) and Southern California Edison (SCE). ETA and SCE operated the S-10s with the goal of placing 25,000 miles on each vehicle within 1 year, providing an accelerated life-cycle analysis. The testing was performed according to established and published test procedures. The S-10s' average ranges were highest during summer months; changes in ambient temperature from night to day and from season-to-season impacted range by as much as 10 miles. Drivers also noted that excessive use of power during acceleration also had a dramatic effect on vehicle range. The spirited performance of the S-10s created a great temptation to inexperienced electric vehicle drivers to ''have a good time'' and to fully utilize the S-10's acceleration capability. The price of injudicious use of power is greatly reduced range and a long-term reduction in battery life. The range using full-power accelerations followed by rapid deceleration in city driving has been 20 miles or less.

J. Francfort (INEEL); J. Argueta; M. Wehrey (Southern California Edison); D. Karner; L. Tyree (Electric Transportation Applications)

1999-07-01T23:59:59.000Z

409

Performance indicators, third quarter CY-1991  

SciTech Connect

Secretary of Energy Notice (SEN-29-91) directed that a Department- wide uniform system of Performance Indicators (PI's) for trending and analyzing operational data to help assess and support progress in improving performance and in strengthening line management control of operations relating to environmental safety, and health activities'' be developed. This Performance Indicator Report represents a compilation of data for the third quarter of calendar year 1991 for the following Lawrence Berkeley Laboratory (LBL) facilities: (1) Bevalac, (2) 88-Inch Cyclotron, (3) Materials Sciences Division.

Not Available

1992-01-01T23:59:59.000Z

410

Performance indicators, third quarter CY-1991  

SciTech Connect

Secretary of Energy Notice (SEN-29-91) directed that a Department- wide ``uniform system of Performance Indicators (PI`s) for trending and analyzing operational data to help assess and support progress in improving performance and in strengthening line management control of operations relating to environmental safety, and health activities`` be developed. This Performance Indicator Report represents a compilation of data for the third quarter of calendar year 1991 for the following Lawrence Berkeley Laboratory (LBL) facilities: (1) Bevalac, (2) 88-Inch Cyclotron, (3) Materials Sciences Division.

Not Available

1992-01-01T23:59:59.000Z

411

3Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2006 (PDF), Facility Representative Program Performance 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 76% fully qualified 41% staffing level

412

Quarterly Cybersecurity Awareness Campaigns and Toolkits | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quarterly Cybersecurity Awareness Campaigns and Toolkits Quarterly Cybersecurity Awareness Campaigns and Toolkits The OCIO coordinates a variety of internal cybersecurity awareness...

413

INCITE Quarterly Report Policy | Argonne Leadership Computing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tukey Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job...

414

NEPA Lessons Learned Quarterly Report September 2001, No. 27, Third Quarter FY 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA NEPA Lessons Lear ned September 2001 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 2001 September 4, 2001; Issue No. 28 continued on page 2 NEPA Compliance Officers Consider Further Improvements "What's New, What's Next," was the theme of the Department of Energy (DOE) NEPA Compliance Officers (NCOs) meeting on June 13 and 14, 2001, in Washington, DC. Convened by the Office of NEPA Policy and Compliance, the meeting involved 70 participants including Program and Field Office NCOs, Headquarters NEPA attorneys, and others. In welcoming participants, Carol Borgstrom, Director, Office of NEPA Policy and Compliance, recounted recent goals for DOE's NEPA Compliance Program before considering new challenges. She noted that in the 1990s, the Department achieved significant improvements

415

Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.  

SciTech Connect

Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.

Dunnigan, James; DeShazer, J.; Garrow, L.

2009-05-26T23:59:59.000Z

416

Threat Insight Quarterly Wireless Technology  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Wireless Technology April 2006 #12;X - F O R C E T H R E A T I N the Wireless Threat ..................................................3 Wireless Threats-Force Catastrophic Risk Index...................................... 13 Future X-Force Threat Insight Quarterly Topics

417

ADVANCED GAS TURBINE SYSTEMS RESEARCH PROGRAM  

SciTech Connect

The quarterly activities of the Advanced Gas Turbine Systems Research (AGTSR) program are described in this quarterly report. As this program administers research, we have included all program activity herein within the past quarter as dated. More specific research progress reports are provided weekly at the request of the AGTSR COR and are being sent to NETL As for the administration of this program, items worthy of note are presented in extended bullet format following the appropriate heading.

Lawrence P. Golan

2002-07-01T23:59:59.000Z

418

(Pittsburgh Energy Technology Center): Quarterly technical progress report for the period ending June 30, 1987. [Advanced Coal Research and Technology Development Programs  

SciTech Connect

Research programs on coal and coal liquefaction are presented. Topics discussed are: coal science, combustion, kinetics, surface science; advanced technology projects in liquefaction; two stage liquefaction and direct liquefaction; catalysts of liquefaction; Fischer-Tropsch synthesis and thermodynamics; alternative fuels utilization; coal preparation; biodegradation; advanced combustion technology; flue gas cleanup; environmental coordination, and technology transfer. Individual projects are processed separately for the data base. (CBS)

None

1988-02-01T23:59:59.000Z

419

Third Quarter Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, fourteen local earthquakes were recorded during the third quarter of fiscal year 2008. The largest event recorded by the network during the third quarter (May 18, 2008 - magnitude 3.7 Mc) was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, five earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and three earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, eight earthquakes occurred in swarm areas and six earthquakes were classified as random events. The largest event recorded by the network during the third quarter occurred on May 18 (magnitude 3.7 Mc) and was located approximately 17 km east of Prosser at a depth of 20.5 km. This earthquake was the highest magnitude event recorded in the 46-47 N. latitude / 119-120 W. longitude sector since 1975. The May 18 event, not reported as being felt on the Hanford site or causing any damage, was communicated to the PNNL Operations Center per HSAP communications procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the sites seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and the 400 Area were triggered by the May 18 event. The reportable action level of 2% g for Hanford facilities is approximately 12 times larger than the peak acceleration (0.17%) observed at the 300 Area SMA station and no action was required.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-09-01T23:59:59.000Z

420

Meteorological and air quality data quarterly report. WIPP site: Eddy County, New Mexico. Summer quarter, June 1977-August 1977  

SciTech Connect

The purpose of the WIPP meteorological, air quality, and radiological measurements program was to support the environmental effort for the evaluation of the site suitability. This data report is the latest in a series of seasonal quarterly data summaries to be issued for the southeastern New Mexico site.

Pocalujka, L.P.; Babij, E.; Catizone, P.A.; Church, H.W.

1980-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Molten Salt Coal Gasification Process Development Unit. Phase 2. Quarterly technical progress report No. 2, October-December 1980  

SciTech Connect

This represents the second quarterly progress report on Phase 2 of the Molten Salt Coal Gasification Process Development Unit (PDU) Program. Phase 1 of this program started in March 1976 and included the design, construction, and initial operation of the PDU. On June 25, 1980, Phase 2 of the program was initiated. It covers a 1-year operations program utilizing the existing PDU and is planned to include five runs with a targeted total operating time of 9 weeks. During this report period, Run 6, the initial run of the Phase 2 program was completed. The gasification system was operated for a total of 95 h at pressures up to 10 atm. Average product gas HHV values of 100 Btu/scf were recorded during 10-atm operation, while gasifying coal at a rate of 1100 lb/h. The run was terminated when the melt overflow system plugged after 60 continuous hours of overflow. Following this run, melt withdrawal system revisions were made, basically by changing the orifice materials from Monofrax to an 80 Cobalt-20 Chromium alloy. By the end of the report period, the PDU was being prepared for Run 7.

Not Available

1981-01-20T23:59:59.000Z

422

Lessons Learned Quarterly Report, December 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Lessons Learned Quarterly Report, December 2009 Welcome to the 61st quarterly report on lessons learned in the NEPA process. In this issue, we highlight many of the ways that the NEPA process furthers transparency in government decisionmaking. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE Begins Online Posting of Categorical Exclusion Determinations CEQ Reports Timely NEPA Reviews for Recovery Act Comprehensive Draft EIS for Hanford Issued Y-12 Public Hearings Show Different Perspectives Revised Background Radiation Exposure Estimates Electronic CX Determination Form New Executive Order on Greenhouse Gases, Sustainability BPA Environmental Leadership Award

423

Visual display of reservoir parameters affecting enhanced oil recovery. Third quarterly report, [April 1995--June 1995  

SciTech Connect

This project will provide a detailed example, based on a field trial, of how to evaluate a field for enhanced oil recovery (EOR) operations utilizing data typically available in a filed that has undergone primary development. The approach will utilize readily available, affordable computer software and analytical services. The GeoGraphix Exploration System (GES) software package was acquired this quarter and installed. Well logging, formation tops and other data are being loaded into the program. We also acquired and installed GeoGraphix`s well-log evaluation package, QLA2. Miocene tops for the entire Pioneer Anticline were loaded into the GES system and contour maps and 3D surface visualizations were constructed. Fault data have been digitized and will soon be loaded into the GeoGraphix mapping module and combined with formation-top data to produce structure maps which will display all fault traces. The versatile program MatLab can be used to perform time series analysis and to produce spatial displays of data. MatLab now has a 3D volume visualization package. In the coming quarter we will test MatLab using Pioneer data set.

Wood, J.R.

1995-07-01T23:59:59.000Z

424

Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994  

SciTech Connect

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-04-01T23:59:59.000Z

425

Quarterly coal report, July--September 1997  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

NONE

1998-02-01T23:59:59.000Z

426

Natural Gas Imports and Exports Third Quarter Report 2013 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Report 2013 Natural Gas Imports and Exports Third Quarter Report 2013 Natural Gas Imports and Exports Third Quarter Report 2013 Natural Gas Imports and Exports Third...

427

Natural Gas Imports and Exports - First Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - First Quarter Report 2012 Natural Gas Imports and Exports - First Quarter Report 2012 Natural Gas Imports and Exports - First Quarter Report...

428

Natural Gas Imports and Exports - Second Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports...

429

Natural Gas Imports and Exports - Second Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report...

430

Natural Gas Imports and Exports - Third Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report...

431

Natural Gas Imports and Exports - Third Quarter Report 2011 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report...

432

Natural Gas Imports and Exports - Second Quarter Report 2013...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and...

433

Natural Gas Imports and Exports Second Quarter Report 2014 |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Second Quarter Report 2014 Natural Gas Imports and Exports Second Quarter Report 2014 Natural Gas Imports and Exports Second Quarter Report 2014 Natural Gas Imports and Exports...

434

Natural Gas Imports and Exports Fourth Quarter Report 2013 |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Report 2013 Natural Gas Imports and Exports Fourth Quarter Report 2013 Natural Gas Imports and Exports Fourth Quarter Report 2013 Natural Gas Imports and Exports...

435

Natural Gas Imports and Exports - Fourth Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports...

436

Natural Gas Imports and Exports First Quarter Report 2014 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter Report 2014 Natural Gas Imports and Exports First Quarter Report 2014 Natural Gas Imports and Exports First Quarter Report 2014 Natural Gas Imports and Exports First...

437

Natural Gas Imports and Exports - First Quarter Report 2011 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report...

438

Natural Gas Imports and Exports - Fourth Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report...

439

Natural Gas Imports and Exports - First Quarter Report 2013 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report...

440

PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993  

SciTech Connect

This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

Not Available

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

High Flux Isotope Reactor quarterly report, January-March 1986  

SciTech Connect

Four routine cycles of operation were completed during the first quarter. Four scheduled end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 86.9%. An unscheduled control plate and control cylinder replacement was performed after tantalum contamination in the primary coolant system was traced to the inner cylinder.

Corbett, B.L.; Farrar, M.B.

1986-06-01T23:59:59.000Z

442

NEPA Lessons Learned Quarterly Report, Fourth Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 Fourth Quarter FY 2006 December 1, 2006; Issue No. 49 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 6) Scoping Process Underway for Two Yucca Mountain EISs The Department of Energy (DOE) recently initiated public scoping for two EISs related to Yucca Mountain, the Nation's proposed repository for disposal of commercial

443

NEPA Lessons Learned Quarterly Report, Second Quarter FY 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 1 7 1 Second Quarter FY 2007 June 1, 2007; Issue No. 51 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A We have all been told to "work together" to accomplish a particular goal. Together Everyone Achieves More illustrates the benefi ts of "teamwork." Federal agencies, including the Council on Environmental Quality

444

NEPA Lessons Learned Quarterly Report Questionnaire | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire This questionnaire is used to collect information from the Department of Energy (DOE) National Environmental Policy Act (NEPA) Community. In accordance with DOE Order 451.1B, NEPA Compliance Program, NEPA Document Managers and NEPA Compliance Officers should fill out a questionnaire (separately or jointly) as soon as possible after completing each environmental impact statement (EIS) and environmental assessment (EA). Questionaires also may be returned earlier, at any time during the NEPA process, to share valuable lessons learned with others. Other document preparation team members also are encouraged to submit a questionnaire. Information provided through this questionaire helps the Office of NEPA

445

Lessons Learned Quarterly Report, June 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 2002 Lessons Learned Quarterly Report, June 2002 Welcome to the 31st quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Articles in this issue include: Beverly Cook Balances NEPA Objectives: Both Flexibility and Consistency Are Needed DOE NEPA Community Meeting in July Expanding Online Access to DOE NEPA Documents Change in e-file Submittal Address Perspectives from a Town Official EH Priority: Guidance to Improve NEPA Implementation EPA Distributes Reminders on Filing an EIS Interior Department Welcomes Electronic EISs New on the NEPA Bookshelf Transitions Whats New from CEQ Training Opportunities Litigation Updates Proposals Due for New DOE-wide Contracts EAs and EISs Completed This Quarter

446

Lessons Learned Quarterly Report, September 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Lessons Learned Quarterly Report, September 2002 Welcome to the 32nd quarterly report on lessons learned in the NEPA process. Much of this issue is devoted to reporting on the July DOE NEPA Community Meeting. Also featured is new NEPA-related guidance. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Community Meeting Addresses Reform Initiatives New Guidance Issued, More Underway Accident Analysis Guidance Agencies Discuss Indian Sacred Sites e-NEPA: Security Certification Needed Draft Information Quality Guidelines Litigation Updates DOE-wide NEPA Contracts Update Training Opportunities EAs and EISs Completed This Quarter NEPA Document Cost and Time Facts Recent EIS-Related Milestones What Worked and Didn't Work

447

Quarterly Nuclear Deployment Summary, January 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deployment Summary, January 2013 Deployment Summary, January 2013 Quarterly Nuclear Deployment Summary, January 2013 January 30, 2013 - 5:59pm Addthis Quarterly Updates On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

448

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Distribution Category UC-950 Quarterly Coal Report April-June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of B.D. Hong, Leader, Coal Infor- mation Team, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section should be directed to Paulette Young at (202) 426-1150, email

449

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of B.D. Hong, Leader, Coal Infor- mation Team, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section should be directed

450

Simulation and Optimization on Power Plant Operation Using SEGA's EOP Program  

E-Print Network (OSTI)

operation under different conditions was investigated. Further more, (online) operational optimization is made possible by load re-assignment according to EOP's calculation. Other researches on plant operation, such as the impact of utility rates...

Zhou, J.; Deng, S.; Turner, W. D.; Liu, M.

451

Simulation and Optimization on Power Plant Operation Using Sega's EOP Program  

E-Print Network (OSTI)

operation under different conditions was investigated. Further more, (online) operational optimization is made possible by load reassignment according to EOP's calculation. Other researches on plant operation, such as the impact of utility rates...

Zhou, J.; Deng, S.; Turner, W. D.; Liu, M.

2000-01-01T23:59:59.000Z

452

Yucca Mountain Site Characterization Project technical data catalog quarterly supplement  

SciTech Connect

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1995-03-31T23:59:59.000Z

453

Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement  

SciTech Connect

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1994-12-31T23:59:59.000Z

454

Natural gas imports and exports. First quarter report 1994  

SciTech Connect

The Office of Fuels Programs Prepares quarterly reports Summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the first quarter of 1994 (January--March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During the first three months of 1994, data indicates that gas imports grew by about 14 percent over the level of the first quarter of 1993 (668 vs. 586 Bcf), with Canadian and Algerian imports increasing by 12 and 53 percent, respectively. During the same time period, exports declined by 15 percent (41 vs. 48 Bcf). Exports to Canada increased by 10 percent from the 1993 level (22 vs. 20 Bcf) and exports to Mexico decreased by 64 percent (5 vs. 14 Bcf).

Not Available

1994-08-01T23:59:59.000Z

455

Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement  

SciTech Connect

The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

NONE

1994-03-31T23:59:59.000Z

456

Coal liquefaction process research quarterly report, October-December 1979  

SciTech Connect

This quarterly report summarizes the activities of Sandia's continuing program in coal liquefaction process research. The overall objectives are to: (1) provide a fundamental understanding of the chemistry of coal liquefaction; (2) determine the role of catalysts in coal liquefaction; and (3) determine the mechanism(s) of catalyst deactivation. The program is composed of three major projects: short-contact-time coal liquefaction, mineral effects, and catalyst studies. These projects are interdependent and overlap significantly.

Bickel, T.C.; Curlee, R.M.; Granoff, B.; Stohl, F.V.; Thomas, M.G.

1980-03-01T23:59:59.000Z

457

FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS  

SciTech Connect

PG&E NEG Salem Harbor Station Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of mercury control at Salem Harbor Unit 1, including performance, estimated cost, and operation data. This unit has very high native mercury removal, thus it was important to understand the impacts of process variables on native mercury capture. The team responsible for executing this program included plant and PG&E headquarters personnel, EPRI and several of its member companies, DOE, ADA, Norit Americas, Inc., Hamon Research-Cottrell, Apogee Scientific, TRC Environmental Corporation, Reaction Engineering, as well as other laboratories. The technical support of all of these entities came together to make this program achieve its goals. Overall the objectives of this field test program were to determine the mercury control and balance-of-plant impacts resulting from activated carbon injection into a full-scale ESP on Salem Harbor Unit 1, a low sulfur bituminous-coal-fired 86 MW unit. It was also important to understand the impacts of process variables on native mercury removal (>85%). One half of the gas stream was used for these tests, or 43 MWe. Activated carbon, DARCO FGD supplied by NORIT Americas, was injected upstream of the cold side ESP, just downstream of the air preheater. This allowed for approximately 1.5 seconds residence time in the duct before entering the ESP. Conditions tested in this field evaluation included the impacts of the Selective Non-Catalytic Reduction (SNCR) system on mercury capture, of unburned carbon in the fly ash, of adjusting ESP inlet flue gas temperatures, and of boiler load on mercury control. The field evaluation conducted at Salem Harbor looked at several sorbent injection concentrations at several flue gas temperatures. It was noted that at the mid temperature range of 322-327 F, the LOI (unburned carbon) lost some of its ability to capture vapor phase Hg, however activated carbon performed relatively well. At the normal operating temperatures of 298-306 F, mercury emissions from the ESP were so low that both particulate and elemental mercury were ''not detected'' at the detection limits of the Ontario Hydro method for both baseline and injection tests. The oxidized mercury however, was 95% lower at a sorbent injection concentration of 10 lbs/MMacf compared with baseline emissions. When the flue gas temperatures were increased to a range of 343-347 F, mercury removal efficiencies were limited to <25%, even at the same sorbent injection concentration. Other tests examined the impacts of fly ash LOI, operation of the SNCR system, and flue gas temperature on the native mercury capture without sorbent injection. Listed below are the main conclusions from this program: (1) SNCR on/off test showed no beneficial effect on mercury removal caused by the SNCR system. (2) At standard operating temperatures ({approx} 300 F), reducing LOI from 30-35% to 15-20% had minimal impact on Hg removal. (3) Increasing flue gas temperatures reduced Hg removal regardless of LOI concentrations at Salem Harbor (minimum LOI was 15%). Native mercury removal started to fall off at temperatures above 320 F. ACI effectiveness for mercury removal fell off at temperatures above 340 F. (4) Test method detection limits play an important role at Salem Harbor due to the low residual emissions. Examining the proposed MA rule, both the removal efficiency and the emission concentrations will be difficult to demonstrate on an ongoing basis. (5) Under tested conditions the baseline emissions met the proposed removal efficiency for 2006, but not the proposed emission concentration. ACI can meet the more-stringent 2012 emission limits, as long as measurement detection limits are lower than the Ontario Hydro method. SCEM testing was able to verify the low emissions. For ACI to perform at this level, process conditions need to match those obtained during testing.

Michael D. Durham

2004-10-01T23:59:59.000Z

458

4Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2007 (PDF), Facility Representative Program Performance 4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2007. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 83% Fully Qualified (last Quarter was 82%) 85% Staffing Level (last Quarter was 93%) 45% Time Spent in the Field (DOE goal is >40%) 73% Time Spent in Oversight Activities (DOE Goal is> 65%)"

459

1Q CY2009 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2009 (PDF), Facility Representative Program Performance 1Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2009. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 78% Fully Qualified ( last Quarter was 76%) 90% Staffing Level ( last Quarter was 89%) 47% Time Spent in the Field (DOE goal is>40%) 74% Time Spent in Oversight Activites (DOE Goal is>65%)"

460

2Q CY2009 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2009 (PDF), Facility Representative Program Performance 2Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2009. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 77% Fully Qualified (last quarter was 78%) 90% Staffing Level ( last Quarter was 90%); 45% Time Spent in the Field (DOE goal is>40%); and 73% Time Spent in Oversight Activites (DOE Goal is > 65%)"

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

4Q CY2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2008 (PDF), Facility Representative Program Performance 4Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 76% Fully Qualified ( last Quarter was 80%) 89% Staffing Level (last Quarter was 89%) 44% Time Spent in the Field ( Department of Energy)(DOE) goal is > 40%) 73% Time Spent in Oversight Activites (DOE Goal is> 65%)"

462

Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

463

Report on Audit of the Department of Energy Program Offices' Use of Management and Operating Contractor Employees, IG-0392  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT OF THE DEPARTMENT OF ENERGY PROGRAM OFFICES' USE OF MANAGEMENT AND OPERATING CONTRACTOR EMPLOYEES The Office of Inspector General wants to make the distrution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the

464

A Mixed-Integer Linear Programming Model for Optimizing the Scheduling and Assignment of Tank Farm Operations  

E-Print Network (OSTI)

1 A Mixed-Integer Linear Programming Model for Optimizing the Scheduling and Assignment of Tank) formulation for the Tank Farm Operation Problem (TFOP), which involves simultaneous scheduling of continuous multi-product processing lines and the assignment of dedicated storage tanks to finished products

Grossmann, Ignacio E.

465

Quarterly coal report, April--June 1997  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

NONE

1997-11-01T23:59:59.000Z

466

Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006  

SciTech Connect

This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

Hartman, Mary J.

2006-11-01T23:59:59.000Z

467

DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program Joint Research and Development Plan  

SciTech Connect

Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nations electrical generation capability.

Don Williams

2014-04-01T23:59:59.000Z

468

MHD electrode development. Quarterly report, April-June 30, 1980  

SciTech Connect

Emphasis within this program is now being directed towards the engineering development of cold metallic electrodes, and in particular the identification and evaluation of alternatives to platinum for use as anodes. A literature search, concentrating on hot corrosion resistant alloys, has been undertaken and results are presented. In addition, results of platinum-copper diffusion studies and a preliminary evaluation of sputter coated specimens of TiB/sub 2/ clad copper are reported. Laboratory anode arc erosion studies have continued. A number of modifications incorporated in the test setup are described. This modified test arrangement has been used to obtain comparative data on a number of potential anode metal alloys. Further work is required to refine the test, particularly to provide a reliable method of applying corrodent to the specimens under test. No significant laboratory electrochemical corrosion tests were completed during this reporting period. Facility test operations were suspended upon completion of WESTF Test 49 during the prior quarter to permit basic facility modifications in support of the addition of a 3 Tesla magnet. The status of design, procurement and modification activities is presented.

Sadler, J W; Dietrick, D L; Frantti, E W

1980-08-01T23:59:59.000Z

469

Coal liquefaction. Quarterly report, April-June 1979  

SciTech Connect

DOE's program for the conversion of coal to liquid fuels was begun by two of DOE's predecessor agencies: Office of Coal Research (OCR) in 1962, and Bureau of Mines, US Department of the Interior, in the 1930's. Current work is aimed at improved process configurations for both catalytic and non-catalytic processes to provide more attractive processing economics and lower capital investment. The advantage of coal liquefaction is that the entire range of liquid products, especially boiler fuel, distillate fuel oil, and gasoline, can be produced from coal by varying the type of process and operating conditions used in the process. Furthermore, coal-derived liquids have the potential for use as chemical feedstocks. To provide efficient and practical means of utilizing coal resources, DOE is supporting the development of several conversion processes that are currently in the pilot plant stage. DOE, together with the Electric Power Research Institue, has contracted with fourteen projects are described brieflly: funding, description, status, history, and progress in the current quarter. (LTN)

None

1980-04-01T23:59:59.000Z

470

Stockpile Stewardship Quarterly  

National Nuclear Security Administration (NNSA)

Message from the (Acting) Assistant Deputy Administrator for Research, Development, Test, and Evaluation, Roger A. Lewis Defense Programs Stockpile Stewardship in Action Volume...

471

NEPA Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEARNED LEARNED LESSONS N E P A Inside LESSONS LEARNED March 1, 1996 Quarterly Report LESSONS LEARNED National Environmental Policy Act U.S. Department of Energy Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPA- related information, and enhanced the format for better clarity and overall readability. This Quarterly Report includes: * NEPA lessons learned at the Hanford Site - Page 1 * Mini-guidance on the preparation of EIS summaries, properly eliminating alternatives and impacts from detailed analysis, application of DOE NEPA regulations to procurement, and NEPA questions and answers - Pages 3-6 * Updates on the proposed amendments to DOE's NEPA

472

Quarterly Coal Distribution Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Distribution Report Quarterly Coal Distribution Report Release Date: October 01, 2013 | Next Release Date: January 3, 2014 | full report The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of transportation, and consuming sector. Quarterly data for all years are preliminary and will be superseded by the release of the corresponding "Annual Coal Distribution Report." Highlights for the second quarter 2013: Total domestic coal distribution was an estimated 205.8 million short tons (mmst) in the second quarter 2013. This value is 0.7 mmst (i.e. 0.3 percent) higher than the previous quarter and 6.3 mmst (i.e. 3.1 percent) higher than the second quarter of 2012 estimates.

473

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program; Satellite Facilities Operation and Maintenance, 2005 Annual Report.  

SciTech Connect

There were 2 acclimation periods at the Catherine Creek Acclimation Facility (CCAF) in 2005. During the early acclimation period, 130,748 smolts were delivered from Lookingglass Hatchery (LGH) on 7 March. This group contained progeny of both the captive (53%) and conventional broodstock programs. The size of the fish at delivery was 23.9 fish/lb. Volitional releases began 14 March 2005 and ended 27 March with an estimated total (based on PIT tag detections of 3,187) of 29,402 fish leaving the raceways. This was 22.5% of the total fish delivered. Fish remaining in the raceways after volitional release were forced out. Hourly detections of PIT-tagged fish showed that most of the fish left around 1900 hours. The size of the fish just before the volitional release was 23.9 and the size of the fish remaining just before the forced release was 23.2 fish/lb. The total mortality for the acclimation period was 204 (0.16%). The total number of fish released from the acclimation facility during the early period was 130,544. During the second acclimation period 59,100 smolts were delivered from LGH on 28 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 21.8 fish/lb. Volitional releases began 3 April 2005 and ended with a force out emergency release on 7 April. The size of the fish just before the volitional release was 21.8. The total mortality for the acclimation period was 64 (0.11 %). The total number of fish released from the acclimation facility during the late period was 59,036. There was only 1 planned acclimation period at the Upper Grande Ronde Acclimation Facility (UGRAF) in 2005. During the early acclimation period 105,418 smolts were delivered from LGH on 8 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 21.0 fish/lb. There was no volitional release in 2005 due to freezing air and water conditions prompting an early release. The total mortality for the acclimation period was 49 (0.05 %). The total number of fish released from the acclimation facility during the late period was 105,369. Maintenance and repair activities were conducted at the acclimation facilities in 2005. Facility maintenance work consisted of snow removal, installation of drainage lines, removal of gravel from intake area, installation of new gate at the CCAF, and complete overhaul of 2 travel trailers. The Catherine Creek Adult Capture Facility (CCACF) was put into operation on 11 February 2005. The first adult summer steelhead was captured on 4 March. A total of 190 adult summer steelhead were trapped and released from 4 March to 16 May 2005. Peak arrival at the trap was the week of 8 April. The first adult spring Chinook salmon was captured at CCACF on 6 May 2005. A total of 226 spring Chinook salmon were trapped from 6 May to 8 July 2005. There were 56 adults and 4 jacks unmarked and 136 adult and 30 jack marked spring Chinook salmon trapped. Peak arrival at the trap was the week of 10 June for the unmarked and marked fish. None of the captive broodstock returns were collected for broodstock. Broodstock was collected systematically over the entire return from 31 May to 6 July 2005. Ten of the 34 broodstock collected and transported from CCACF to LGH were unmarked fish trapped. About 18% of the naturally produced adult males and females trapped were taken to LGH for broodstock. One jack was collected for every 5 adult males that were taken to LGH. A total of 30 age 4 and 5 and 4 age 3 fish were transported to LGH for broodstock. The hatchery component of the broodstock was 66.7%. Five weekly spawning surveys were conducted below the weir on Catherine Creek beginning 30 June 2005. During these surveys no live or dead fish were observed. The trap was removed from Catherine Creek on 3 August 2005. Temperatures at the CCACF ranged from -0.1 C on 14 February to 23.7 C on 21 July. The hourly temperatures at the adult trap during the period of operation showed that the lowest water temperatures

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2006-01-01T23:59:59.000Z

474

Short-term energy outlook: Quarterly projections, second quarter 1997  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

NONE

1997-04-01T23:59:59.000Z

475

Program Update: 3rd Quarter 2014  

Energy.gov (U.S. Department of Energy (DOE))

Inside this Update: 2014 LM All-Hands Training, LM to Meet Energy Metering Goals, Anatomy of a Groundwater Uranium Plume, DOE Submits Its Defense-Related Uranium Mines Report to Congress, Analysis...

476

Stockpile Stewardship Program Quarterly Experiments | National...  

National Nuclear Security Administration (NNSA)

facility at Los Alamos National Laboratory, National Ignition Facility (NIF) at Lawrence Livermore National Laboratory, and the Z machine at Sandia National Laboratories. The...

477

Wind Program Newsletter: Fourth Quarter 2012  

Energy.gov (U.S. Department of Energy (DOE))

As the 2012 calendar year comes to a close and we look ahead to 2013, we at the Department of Energy have a unique opportunity to not only reflect on where we've been, but to look forward to where...

478

Wind Program Newsletter: First Quarter 2013  

Energy.gov (U.S. Department of Energy (DOE))

I write this letter to you during a very exciting time for the wind energy industry. As reported by AWEA earlier this year, 2012 proved to be another record-setting year for wind energy. More.

479

Program Update: 4th Quarter 2014  

Energy.gov (U.S. Department of Energy (DOE))

Inside this Update: Enhanced BioremediationPinellas County, Florida, Site; New Eligibility Guidelines Lead to Increase in LMs EEOICPA Requests for FY 2014; Thinking Outside the Box: Materials...

480

Program Update: 1st Quarter 2014  

Energy.gov (U.S. Department of Energy (DOE))

Inside this Update: DOE Celebrates 20-Year Anniversary of Executive Order 12898; LM Updates the Public on Defense-Related Uranium Mines Report to Congress; LM Issues ULP PEIS; Tracking Uranium...

Note: This page contains sample records for the topic "operator program quarterly" from the National Library of EnergyBeta (NLEBeta).
Wh