Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

2

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

3

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

4

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

5

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

6

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

Wick, Mike

2008-12-30T23:59:59.000Z

7

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

8

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

9

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

10

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

11

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

12

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

13

Operating and maintenance experience in tritium environments  

Science Conference Proceedings (OSTI)

This presentation is a summary of practical experience gained over more than twenty years from analyzing failures of process equipment operated in tritium and deuterium environments. Significant improvements have been achieved in design and procurement of new equipment, testing and selection of materials, and gradually more favorable maintenance experience. Preferred materials and inspection methods are described. 6 tabs.

Tuer, G.L.

1987-01-01T23:59:59.000Z

14

Operations and Maintenance Manual for Large Aperture Scanner System  

Science Conference Proceedings (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

15

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

16

Void Fraction Instrument operation and maintenance manual  

SciTech Connect

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

17

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM® (Decision Support for ...

18

Operations and maintenance reports | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

from an expert Take a comprehensive approach Operations and maintenance reports ENERGY STAR Building Upgrade Manual Install renewable energy systems Save water to save energy...

19

Empowering Operations and Maintenance through Wireless  

Science Conference Proceedings (OSTI)

Presentation Title, Empowering Operations and Maintenance through Wireless. Author(s), Neil Freeman, Soroush Amidi, David Fisk. On-Site Speaker (Planned)

20

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

22

Operation, modification, and maintenance of DOE/PETC 700 H. P. combustion test facility. Yearly activity report, April 3, 1978--April 1, 1979  

SciTech Connect

The operation, modifications and maintenance of the DOE/PETC 700 H.P. combustion test facility are described. Shakedown and operation limit tests were performed with No. 6 fuel oil and 30% COM. The tests involved flame studies, erosion, corrosion and the examination of boiler deposits. Various construction, modification and maintenance efforts are detailed. The original 100 H.P. test facility was scrapped after 3 months operation under this contract and construction of a new 100-20 H.P. test facility begun. (LTN)

1978-01-01T23:59:59.000Z

23

Operations and Maintenance Best Practices Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide October 7, 2013 - 9:56am Addthis The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital investment. Depending on the facility, these savings can represent thousands to hundreds-of-thousands of dollars each year. Read the Operations and Maintenance (O&M) Best Practices Guide: Release 3.0. See individual chapters: Front Matter

24

Value-Based Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Utilities can maximize the net corporate value of their operating and maintenance practices through a systematic approach that employs decision analysis techniques and marginal-value analysis. In a case study that confirmed the merit of the value-based approach, Duke Power Company developed and tested decision trees for specific predictive maintenance scenarios.

1995-04-14T23:59:59.000Z

25

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

26

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Management Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into...

27

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

28

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

Timely and proper execution of operation and maintenance (O&M) activities may be a key factor in ensuring the successful function of selective catalytic reduction (SCR) systems. This report serves as the 2012 update of EPRI’s Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New and revised content this year includes: 1) recent developments in in situ NOx analyzers, including a ...

2012-12-05T23:59:59.000Z

29

Federal Energy Management Program: Operations and Maintenance Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

30

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

31

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

32

ATLAS Maintenance and Operation management system  

E-Print Network (OSTI)

The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

Copy, B

2007-01-01T23:59:59.000Z

33

ICD Complex Operations and Maintenance Plan  

SciTech Connect

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

34

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

35

Operations and Maintenance Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

36

Davis PV plant operation and maintenance manual  

DOE Green Energy (OSTI)

This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

NONE

1994-09-01T23:59:59.000Z

37

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

38

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

39

Operations and Maintenance Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

40

Design of a maintenance and operations recommender  

E-Print Network (OSTI)

from computerized maintenance management systems (CMMS)use computerized maintenance management systems (CMMS) andmanagement and control systems (EMCS) to recom- mend what maintenance

Federspiel, C.; Villafana, L.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Operations and Maintenance Training | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Training Operations and Maintenance Training October 16, 2013 - 5:01pm Addthis Key Actions in O&M Training Have O&M staff shadow Commissioning Agent during commissioning for early interaction with new renewable energy equipment. Train facility staff fully on O&M manual and building systems, regardless of O&M contracts on renewable energy systems. Provide key facility staff with general renewable energy and LEED training prior to building start-up. Look for opportunities for O&M staff to learn from external O&M contractors. To keep a renewable energy system performing at optimal levels, operations and maintenance (O&M) personnel must receive thorough training. A renewable energy system may be properly installed, but without a robust O&M program in place, it will not perform as specified over the long-term.

42

Resources on Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations & Maintenance » Resources on Operations & Maintenance » Resources on Operations and Maintenance Resources on Operations and Maintenance October 7, 2013 - 9:55am Addthis Many helpful resources about operations and maintenance are available. Also see Contacts. Best Practices Operations and Maintenance Best Practices Guide: Document outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website featuring events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information about ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and

43

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This document is the 2010 version of Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New content this year includes: (1) A section on static mixers added in Chapter 3; (2) Substantial expansion of the discussion on inspection of ammonia storage and delivery equipment in Chapter 8; (3) Expanded coverage of unit startup, shutdown, and low-load operation in Chapter 15; (4) a new chapter, Chapter 18, on the means to ensure tha...

2010-11-29T23:59:59.000Z

44

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This document is the 2009 update to Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001. The landscape of selective catalytic reduction (SCR) technology has significantly changed since then and promises to continue to change in the coming years. Specifically, the number of SCR applications on coal-fired units has increased considerably beyond the 15 units operating in mid 2001. Approximately 120 GW of capacity are expected to utilize SCR for NOx co...

2009-12-17T23:59:59.000Z

45

AWEA Wind Project Operations and Maintenance and Safety Seminar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Operations and Maintenance and Safety Seminar AWEA Wind Project Operations and Maintenance and Safety Seminar January 15, 2014 8:00AM EST to January 16, 2014 5:00PM EST San...

46

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Find out about effective metering at Federal facilities Computerized Maintenance Management Systems: Learn about the evaluation and integration of these systems Maintenance...

47

Maintenance and Operations study for K basins sludge treatment  

SciTech Connect

This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

WESTRA, A.G.

1998-11-30T23:59:59.000Z

48

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

49

Federal Energy Management Program: Operations and Maintenance for Major  

NLE Websites -- All DOE Office Websites (Extended Search)

for Major Equipment Types to someone by E-mail for Major Equipment Types to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Google Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Delicious Rank Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

50

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This report is the 2011 update of Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New and revised content this year includes: (1) an analysis of the performance of the U.S. fleet of selective catalytic reduction (SCR)equipped generating units in 2009, 2010, and 2011; (2) a discussion of experience in mitigating the role of arsenic in catalyst deactivation, including the addition of alkali material to the coal; (3) an updat...

2011-12-16T23:59:59.000Z

51

Improving maintenance operation through transformational outsourcing  

E-Print Network (OSTI)

Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

Ye, Jacqueline Ming-Shih

2007-01-01T23:59:59.000Z

52

Guidelines on the Effects of Cycling Operation on Maintenance Activities  

Science Conference Proceedings (OSTI)

Cyclic operation can result in an increase in forced outage rates, higher operation and maintenance (O&M) costs, and further wear and tear on components due to additional overhauls and maintenance. Such operation may also increase unforeseen costs due to additional personnel training requirements and the use of more sophisticated evaluation and inspection techniques. These guidelines are intended to help plant operators and engineers assess the impact of cycling on maintenance activities and take appropr...

2001-12-10T23:59:59.000Z

53

Operations and Maintenance Program Implementation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Implementation Program Implementation Operations and Maintenance Program Implementation October 4, 2013 - 5:16pm Addthis Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies. While no universal plan exists, Federal Energy Management Program (FEMP) recommends the following common steps for implementing O&M programs: Start small: Choose a project that is manageable and can be completed in a short period of time (e.g., six months to one year) Select troubled equipment: Choose a project with visibility because of problematic equipment history Minimize risk: Choose a project that provides immediate and positive results; this project must be successful, so risk of failure should be

54

Operations and Maintenance Program Structure | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Structure Operations and Maintenance Program Structure Operations and Maintenance Program Structure October 4, 2013 - 5:12pm Addthis The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and administration. This approach is commonly referred to as the OMETA principle. Common roles and responsibilities for each function within the OMETA principle are outlined below. Operations The operations function of the O&M program covers the following responsibilities: Administration: Responsible for ensuring effective implementation and control of O&M activities Conduct of Operations: Responsible for ensuring efficient, safe, and reliable process operations across the O&M program

55

O&M First! Facility Metering for Improved Operations, Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet Facility Metering for Improved Operations, Maintenance, and Efficiency Metering and sub-metering of energy and resource use is a critical component of a comprehensive...

56

Solar Photovoltaic System Operations and Maintenance  

Science Conference Proceedings (OSTI)

Grid-connected flat plate solar photovoltaic (PV) systems are being deployed at an accelerating rate worldwide. Representing a growing absolute share of both independent power producer (IPP) and utility generation portfolios, these PV assets are now commanding a greater level of attention to ensure their optimal availability and performance. Contrary to popular belief, PV power plants are not maintenance free; in fact, they require a steady diet of scheduled preventive maintenance and unscheduled service...

2011-12-22T23:59:59.000Z

57

Gas characterization system operation, maintenance, and calibration plan  

DOE Green Energy (OSTI)

This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations.

Tate, D.D.

1996-03-04T23:59:59.000Z

58

Maintenance and operation of the USDOE Alternative Fuel Center  

DOE Green Energy (OSTI)

The Alternative Fuels Utilization Program (AFUP) of the Office of Energy Efficiency and Renewable Energy has investigated the possibilities and limitations of expanded scope of fuel alternatives and replacement means for transportation fuels from alternative sources. Under the AFUP, the Alternative Fuel Center (AFC) was created to solve problems in the DOE programs that were grappling with the utilization of shale oil and coal liquids for transportation fuels. In year one of this contract, a timeline was set to coordinate uses and operations of the AFC hydrogenation pilot plant among test fuels production project work, facility maintenance, other government work, and work for industry for second-generation operations. In year two, consistent with assisting the AFUP in accomplishing its general goals, the work was done with fuel producers, regulators, and users in mind. AFC capabilities and results were disseminated through tours and outside presentations.

Erwin, J.; Moulton, D.S.; Hetrick, D.L. [Southwest Research Inst., San Antonio, TX (United States)] [Southwest Research Inst., San Antonio, TX (United States)

1994-08-01T23:59:59.000Z

59

Underwater Maintenance Guide: Revision 2: A Guide to Diving and Remotely-Operated Vehicle Operations for Nuclear Maintenance Personnel  

Science Conference Proceedings (OSTI)

The use of water in nuclear power generating stations, both as an effective radiation barrier and thermal transfer medium, is critical to basic station operations. Consequently, underwater services play an important role in the maintenance and repair of these stations. Revision 2 of this guide expands previous discussions on underwater maintenance and provides new information on underwater welding and cutting operations and tasks.

1994-05-02T23:59:59.000Z

60

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Operations & Maintenance Best Practices Guide: Release 3.0  

NLE Websites -- All DOE Office Websites (Extended Search)

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

62

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 1998: Johnson Creek Chinook Salmon Supplementation, Biennial Report 1998-2000.  

DOE Green Energy (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon collection and spawning began in 1998. A total of 114 fish were collected from Johnson Creek and 54 fish (20 males and 34 females) were retained for Broodstock. All broodstock were transported to Lower Snake River Compensation Plan's South Fork Salmon River adult holding and spawning facility, operated by the Idaho Department of Fish and Game. The remaining 60 fish were released to spawn naturally. An estimated 155,870 eggs from Johnson Creek chinook spawned at the South Fork Salmon River facility were transported to the McCall Fish Hatchery for rearing. Average fecundity for Johnson Creek females was 4,871. Approximately 20,500 eggs from females with high levels of Bacterial Kidney Disease were culled. This, combined with green-egg to eyed-egg survival of 62%, resulted in about 84,000 eyed eggs produced in 1998. Resulting juveniles were reared indoors at the McCall Fish Hatchery in 1999. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags and 8,043 were also PIT tagged. A total of 78,950 smolts were transported from the McCall Fish Hatchery and released directly into Johnson Creek on March 27, 28, 29, and 30, 2000.

Daniel, Mitch; Gebhards, John

2003-05-01T23:59:59.000Z

63

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1.1 1.1 Chapter 11 Ten Steps to Operational Efficiency Step 1: Strive to increase management awareness and appreciation of the operations and maintenance program/department. * Consider developing a maintenance mission statement and requesting/requiring management sign-off. * Consider developing a maintenance plan and requesting/requiring management sign-off. * Begin the development of the OMETA linkages. - Develop key points of contact within other departments that can participate in the O&M mission. Step 2: Commit to begin tracking Operations and Maintenance activities. * Need to understand where O&M time is spent. * Need to understand where O&M dollars are spent. * Consider (strongly) purchasing or enhancing a Computerized Maintenance Management

64

Operation and Maintenance Experiences of Pumped-Storage Plants  

Science Conference Proceedings (OSTI)

Owners, operators, and designers of hydroelectric pumped-storage plants now have access to the combined operation and maintenance (O&M) knowledge of more than 30 operating plants around the world. The lessons learned should maximize the benefits of solutions developed for typical operational problems.

1991-05-13T23:59:59.000Z

65

Training on PV Systems: Design, Construction, Operation and Maintenance |  

Open Energy Info (EERE)

Training on PV Systems: Design, Construction, Operation and Maintenance Training on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation and Maintenance Agency/Company /Organization: Leonardo Energy Sector: Energy Focus Area: Renewable Energy, Solar Website: www.leonardo-energy.org/node/5948 Training on PV Systems: Design, Construction, Operation and Maintenance Screenshot References: PV Training [1] Overview "A free series of six webinars will be delivered to provide the required knowledge to design a high performance photovoltaic (PV) installation, entering into economic evaluation and project cash-flow. Additionally, very practical aspects such as the construction, start-up, quality management and testing will be reviewed. Plant operation is described in detail, with

66

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Maintenance Operations and Maintenance Graphic of the eTraining logo Training Available Advanced Electric Metering in Federal Facilities: Learn how to take full advantage of advanced electric metering systems by taking this FEMP eTraining course. Many helpful resources about operations and maintenance are available. Best Practices Operations and Maintenance Best Practices Guide: Outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website features events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information on ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and institutional buildings and central plant facilities.

67

Federal Requirements for Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations & Maintenance » Federal Requirements Operations & Maintenance » Federal Requirements for Operations and Maintenance Federal Requirements for Operations and Maintenance October 4, 2013 - 5:09pm Addthis The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving

68

Operations and Maintenance Program Measurement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement October 4, 2013 - 5:19pm Addthis Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a successful O&M program. O&M managers must think beyond reliability. Successful programs incorporate reliability along with controlling costs, evaluating and implementing new technologies, tracking and reporting health and safety issues, and more. Not only are these metrics useful in assessing effectiveness, but also in equipment cost justification, program modifications, and staff hiring. Common Metrics The following metrics are common in evaluating effective O&M programs. Not

69

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network (OSTI)

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative, single and split shaft. The pros and cons of different types are reviewed. Gas turbine component types - axial and centrifugal compressors and different turbine types, along with combustor types will be discussed. Important considerations during machine specifications are also reviewed. Practical aspects such as coatings, materials, fuel handling and auxiliary systems will also be highlighted. Operations and maintenance aspects including Preventative Maintenance, Repairs, Fuel and Air Filtration, Compressor Washing and Reliability is discussed. Typical operating and maintenance costs are provided. This paper presents an extensive bibliography to enable readers to follow up any topic in detail.

Meher-Homji, C. B.; Focke, A. B.

1985-05-01T23:59:59.000Z

70

Operations & Maintenance Best Practices Guide: Release 3.0  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY MANAGEMENT PROGRAM ENERGY MANAGEMENT PROGRAM Release 3.0 Operations & Maintenance Best Practices A Guide to Achieving Operational Efficiency August 2010 Release 3.0 Operations & Maintenance Best Practices A Guide to Achieving Operational Efficiency G. P. Sullivan (a) R. Pugh A. P. Melendez W. D. Hunt August 2010 Prepared by Pacific Northwest National Laboratory for the Federal Energy Management Program U.S. Department of Energy (a) Efficiency Solutions, LLC Disclaimer This report was sponsored by the United States Department of Energy, Office of Energy Efficiency and Renewable Energy, Federal Energy Management Program. Neither the United States Government nor any

71

PV Reliability Operations and Maintenance (PVROM) Database Initiative: 2013 Project Report  

Science Conference Proceedings (OSTI)

To fill a major knowledge gap, EPRI and Sandia National Laboratories are jointly engaged in a multi-year research effort to examine photovoltaic (PV) plant reliability performance obtained through documented field data. Findings and analyses, derived from the PV Reliability Operations Maintenance (PVROM) database, are intended to inform industry best practices around the optimal operations and maintenance (O&M) of solar assets.Currently being populated with initial PV plant ...

2013-12-23T23:59:59.000Z

72

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

73

Operations and Maintenance Program Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Management Program Management Operations and Maintenance Program Management October 4, 2013 - 5:11pm Addthis Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity. The following section outlines the major components of effective O&M management, including: Program Structure: Outlines five distinctive functions making up the O&M organization: Operations, Maintenance, Engineering, Training, and Administration (OMETA) Management Support: Details the importance of gaining management support to an effective O&M program, and how to gain that support Program Implementation: Provides an overview of implementing an effective O&M program and how to maintain that program into the future

74

Request for Information - Operations and Maintenance (O & M) Support  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information - Operations and Maintenance (O & M) Request for Information - Operations and Maintenance (O & M) Support Services for the iManage Request for Information - Operations and Maintenance (O & M) Support Services for the iManage Request for Information (THIS IS NOT A NOTICE OF SOLICITATION ISSUANCE) This is a Special Notice that includes a Request for Information (RFI) to receive comments regarding the attached draft Performance Work Statement (PWS), notice regarding an upcoming Industry Day, and notice regarding one-on-one conferences. This Special Notice is issued solely for information and planning purposes - it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the Government to contract for any supply or service

75

Chiller Plant Operations and Maintenance 4  

E-Print Network (OSTI)

Although heating and cooling systems provide a useful service by keeping occupants comfortable, they also account for a significant portion of a building’s energy use—typically about a quarter. However, it is possible to lessen this impact in both central and unitary systems by increasing their efficiency. This chapter identifies opportunities for improving the performance of heating and cooling systems. Cooling systems generally have higher space-conditioning capacities than heating systems because waste heat from people, lighting, and office equipment supplies a large portion of a building’s heating requirement. Although their higher capacities often translate into more opportunities for savings from cooling systems, significant savings can still be had from heating systems. Following the steps outlined in previous stages of this manual should have reduced cooling and heating loads (Figure 9.1). Many existing systems are oversized to begin with, so it may now be possible to justify replacing the current system with a properly sized one—or retrofitting it to operate more efficiently. When replacing system components, it is extremely important to size the equipment properly to meet current loads. Besides saving energy, proper sizing will

Chiller Plant Retrofits

2008-01-01T23:59:59.000Z

76

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY2006  

SciTech Connect

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document.

B. E. Olaveson

2006-10-02T23:59:59.000Z

77

Nuclear Maintenance Applications Center: Air-Operated Valve Maintenance Guide: Revision 2  

Science Conference Proceedings (OSTI)

An increased awareness of the importance of air-operated valves (AOVs) has led to progressively more sophisticated maintenance practices within the nuclear industry. Nonnuclear plants are also heavily dependent on reliable AOV operation. The dynamic method used by fossil power plants to satisfy transient electrical demands places additional stress on plant components, including AOVs. Therefore, there is a growing need for standardized technical guidance related to AOVs. The Electric Power Research Instit...

2008-12-18T23:59:59.000Z

78

FACILITIES MAINTENANCE & UPKEEP The Lawrence campus is operating three different custodial and maintenance groups on campus resulting in  

E-Print Network (OSTI)

facilities management system, and provide the adequate tools and training necessary. · Implementing contemporary zone maintenance will reduce management and layers, enabling costFACILITIES MAINTENANCE & UPKEEP Context · The Lawrence campus is operating three

Peterson, Blake R.

79

Integrated Requirements Management System Operations and Maintenance Plan  

Science Conference Proceedings (OSTI)

This document provides a plan for the operations and maintenance of the Integrated Requirements Management Systems (IRMS) database. This document describes the roles and responsibilities for the users of the IRMS. Planning is provided for the configuration management of the DOORS software, hardware and data set. Training consideration for the various categories of users is provided.

ACREE, C.D.

2001-03-26T23:59:59.000Z

80

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Computerized Maintenance Chapter 4 Computerized Maintenance � Management System � 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs functions in support of management and tracking of O&M activities. 4.2 CMMS Needs Assessment In determining the need for a CMMS, facility managers should assess their current mode of operation. Key questions to ask include: * Do you have an effective way to generate and track work orders? How do you verify the work was done efficiently and correctly? What is the notification function upon completion? * Are you able to access historical information on the last time a system was serviced, by whom, and for what condition? * How are your spare-parts inventories managed and controlled? Do you have

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O&M Best Practices Guide, Release 3.0 6.1 O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities, size reductions, and most importantly, cost, have opened up an entirely new area of diagnostics to the O&M practitioner. As with the introduction of any new technology, proper application and TRAINING is of

82

Standard hydrogen monitoring system-B operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

Bender, R.M.

1995-01-25T23:59:59.000Z

83

Standard Hydrogen Monitoring System-D operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

Schneider, T.C.

1997-05-01T23:59:59.000Z

84

Standard hydrogen monitoring system - E operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

Schneider, T.C.

1997-06-01T23:59:59.000Z

85

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 8 Metering for Operations and Maintenance Chapter 8 Metering for Operations and Maintenance 8.1 Introduction Metering and sub-metering of energy and resource use is a critical component of a comprehensive O&M program. Metering for O&M and energy/resource efficiency refers to the measurement of quantities of energy delivered, for example, kilowatt-hours of electricity, cubic feet of natural gas, pounds of steam, and gallons of water. Metering may also involve identifying times- of-use for the various energy sources, the instantaneous demand for energy, as well as identify energy use for a collection of buildings, individual buildings, rooms, or specific equipment (e.g., a boiler, chiller, or motor). Facility resource metering has a variety of applications for the Federal facility energy

86

Operations and Maintenance Management Support | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Support Management Support Operations and Maintenance Management Support October 4, 2013 - 5:14pm Addthis Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows activities to be scheduled with the same priority as other management actions. Mission Statement Federal O&M programs should start with a mission statement. This succinct statement should outline the program's main goals, which should be aligned to the overarching goals of site management. Aligning O&M program goals with site goals allows management to understand how O&M supports the facility across the board. It is important to involve both management and facility staff during

87

Operations and Maintenance for Major Equipment Types | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Major Equipment Types for Major Equipment Types Operations and Maintenance for Major Equipment Types October 7, 2013 - 9:53am Addthis Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc. No single resource covers all equipment in use by Federal agencies, and listing major equipment types is beyond the scope of this website. Instead, the Federal Energy Management Program (FEMP) outlines major equipment types within chapter 9 of the Federal Energy Management Programs's (FEMP) O&M Best Practices Guide. The FEMP O&M Best Practices Guide focuses on: Boilers Steam traps Chillers Cooling towers Energy management and building automation systems Air handling systems

88

Longview District Operations and Maintenance Headquarters: Environmental assessment  

Science Conference Proceedings (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

Not Available

1992-03-01T23:59:59.000Z

89

Longview District Operations and Maintenance Headquarters : Environmental Assessment.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

90

Gas turbine operating and maintenance experience in Saudi Arabia  

SciTech Connect

Operation and maintenance of the gas turbines in Saudi Arabia, utilized to drive crude oil shipping pumps and process gas compressors, are discussed. Operation on wet, sour gas is taken into account, emphasizing the hot corrosion problem and the approaches taken to solve it. Intake air filtration is examined, indicating that as a result of an in depth study it was decided to retrofit the turbines with a three stage air filtration system. The methods for applying corrosion resistant coatings to the blades are considered, as are the overhaul logistics and the repair procedures.

Anderson, A.W.

1979-03-01T23:59:59.000Z

91

Installation, Operation, and Maintenance Costs for Distributed Generation Technologies  

Science Conference Proceedings (OSTI)

Distributed generation (DG) is a broad term that encompasses both mature and emerging onsite power generation technologies with power output as small as 1 kW and as large as 20 MW. While the equipment or purchase cost of a DG system is very important, installation, operation, and maintenance (IOM) costs also are significant and often overlooked. This report reviews IOM costs for both mature and emerging DG technologies. Some equipment cost data is included for reference, but is not the focus of this repo...

2003-02-03T23:59:59.000Z

92

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC  

DOE Green Energy (OSTI)

Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

Not Available

1980-09-01T23:59:59.000Z

93

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

94

Reactor technology: power conversion systems and reactor operation and maintenance  

SciTech Connect

The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He/sup 3/ reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored.

Powell, J.R.

1977-01-01T23:59:59.000Z

95

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

96

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network (OSTI)

maintenance. This research is relevant to opera- tions and maintenance challenges facing aging to make equipment last longer.Economic pressures to maintain aging fleets of commercial and military

97

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 O&M Ideas for Major Equipment Types 9 O&M Ideas for Major Equipment Types 9.1 Introduction At the heart of all O&M lies the equipment. Across the Federal sector, this equipment varies greatly in age, size, type, model, fuel used, condition, etc. While it is well beyond the scope of this guide to study all equipment types, we tried to focus our efforts on the more common types prevalent in the Federal sector. The objectives of this chapter are the following: * Present general equipment descriptions and operating principles for the major equipment types. * Discuss the key maintenance components of that equipment. * Highlight important safety issues. * Point out cost and energy efficiency issues. * Highlight any water-related efficiency impacts issues. * Provide recommended general O&M activities in the form of checklists.

98

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Introduction and Overview 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not

99

Operations & Maintenance Best Practices Guide: Release 3.0  

NLE Websites -- All DOE Office Websites (Extended Search)

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

100

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective

102

Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

Rowan, Gerald D.

1997-06-01T23:59:59.000Z

103

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005  

SciTech Connect

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

D. R. Fitch

2005-09-22T23:59:59.000Z

104

Long-Term Surveillance - Operations and Maintenance (LTS-O&M) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-Term Surveillance - Operations and Maintenance Long-Term Surveillance - Operations and Maintenance (LTS-O&M) Long-Term Surveillance - Operations and Maintenance (LTS-O&M) Long-Term Surveillance – Operations and Maintenance (LTS-O&M) DOE established the Environmental Sciences Laboratory (ESL) in Grand Junction, Colorado, in 1991 to support its programs. ESL scientists perform applied research and laboratory-scale demonstrations of soil and groundwater remediation and treatment technologies. Capabilities Installation, monitoring, and operation of permeable reactive barriers Research of permeable reactive barriers and treatment cells Performance assessment and optimization of groundwater remediation systems Groundwater characterization Coupled hydrogeochemical modeling for groundwater remediation

105

Distributed Generation Implementation Guidelines: Operations, Maintenance and Training  

Science Conference Proceedings (OSTI)

In 1997, EPRI conducted a study of how distributed generation (DG) was implemented at approximately 125 facilities in California and throughout the Midwest. Results of that study, as well as subsequent interviews with key facilities done the following year, enabled EPRI to develop guidelines representative of a "best practices" approach to implementing and operating a DG facility based on the experience of others.

1998-12-16T23:59:59.000Z

106

Using Neural Networks in the Maintenance and Operations REcommender...  

NLE Websites -- All DOE Office Websites (Extended Search)

using Neural Networks. By integrating the information from Computerized Maintenance Management Systems (CMMS) and Energy Managementand Control System(EMCS), MORE can analyze and...

107

Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.  

DOE Green Energy (OSTI)

Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

Larson, Roy Edward; Walker, Grant W.

2002-12-31T23:59:59.000Z

108

02/12/2009 1 Division of Operation and Maintenance Engineering  

E-Print Network (OSTI)

of railway system www.jvtc.ltu.se #12;02/12/2009 5 Division of Operation and Maintenance Engineering Research-2008- Completed Improved punctuality through effective maintenance management (Banverket & EU structural funds, JVTC) 2002-2007- Completed Design for/out maintenance of EMC system (Banverket) 2006 ­ 2008 Completed

109

Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect

This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

Norm Stanley

2011-02-01T23:59:59.000Z

110

Industrial operations and maintenance energy measures: A review  

SciTech Connect

Industry consumes a significant percentage of the total electric energy consumption both nationally and in the Pacific Northwest. However, industrial demand-side management (DSM) activities in this sector are underdeveloped and typically concentrate on new technologies and new equipment. An overlooked opportunity for electric resource development is through operations and maintenance (O and M) activities. The purpose of this project is to determine the industrial DSM potential that may be achieved through O and M practices both in the US and the Pacific Northwest. The overall goal of the project is to identify, quantify, confirm, and develop conservation resources that can be achieved from the industrial sector through O and M practices and energy measures. The results of the study identify a significant electric resource potential available through improved O and M activities in industry. Several O and M type energy-saving measures that increase efficiencies and reduce loads are identified and estimates of potential energy savings associated with each measure are presented. Systems identified with the most potential include compressed-air systems; motors and motor drives; lighting; heating, ventilating and air conditioning (HVAC); and control systems. The results of the research show that industrial electric energy consumption can be notably reduced by implementing key O and M type energy measures. Specifically, the results of industrial energy audits, case studies, and other published sources indicate that reductions in energy consumption from improved O and M activities can average between 8% and 12.5%.

Parker, S.A.; Gaustad, K.L.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

111

Operations and Maintenance Development: Preventive Maintenance Program Implementation Self-Assessment Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Preventive maintenance (PM) programs throughout nuclear plants in the United States have evolved from strict compliance with the supplier's general recommendations (which are likely to be much too conservative) to more flexible tasks that are intended to accommodate plant-specific service conditions. During the 1990s, the industry, with support from the Electric Power Research Institute (EPRI), embarked on Preventive Maintenance Optimization (PMO) programs. Most utilities either have implemented or are i...

2007-12-20T23:59:59.000Z

112

A Comparison of Canadian and U.S. Hydro Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Phase 1 of the Comparison of Canadian & American Hydro Operations & Maintenance Practices project indicates that hydroelectric plants in Canada have significantly lower operations and maintenance (O&M) costs than those in the United States. Phase 2, focused on a more in-depth investigation, will begin as soon as permission is granted by the respective plant owners.

1997-12-22T23:59:59.000Z

113

Landfill gas operation and maintenance manual of practice  

DOE Green Energy (OSTI)

This manual has the following objectives: (1) compile and present key portions of the general body of knowledge about operating and maintaining LFG control systems; (2) present information in an easy to understand format useful for hands-on practical use in the field; (3) present accepted practices and procedures for LFG control practices; (4) highlight key points, common mistakes and lessons learned from more than 20 years of industry experience, point out areas of controversy and indicate alternative practices where applicable; (5) compile key reference information; and (6) provide theory and discussion needed to develop a deeper understanding of LFG control and recovery.

NONE

1997-03-01T23:59:59.000Z

114

Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)  

Science Conference Proceedings (OSTI)

This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

Sullivan, Greg; Pugh, Ray; Melendez, Aldo P.; Hunt, W. D.

2010-08-04T23:59:59.000Z

115

Operation and maintenance cost data for residential photovoltaic modules/panels  

DOE Green Energy (OSTI)

Burt Hill Kosar Rittelmann Associates has conducted a study to identify and estimate costs associated with the operation and maintenance of residential photovoltaic modules and arrays. Six basic topics related to operation and maintenance to photovoltaic arrays were investigated - General (Normal) Maintenance, Cleaning, Panel Replacement, Gasket Repair/Replacement, Wiring Repair/Replacement, and Termination Repair/Replacement. The effects of the mounting types - Rack Mount, Stand-Off Mount, Direct Mount, and Integral Mount - and the installation/replacement type - Sequential, Partial Interruption, and Independent - have been identified and described. Recommendation on methods of reducing maintenance costs are made.

None

1980-07-01T23:59:59.000Z

116

The radioactive materials packaging handbook: Design, operations, and maintenance  

Science Conference Proceedings (OSTI)

As part of its required activities in 1994, the US Department of Energy (DOE) made over 500,000 shipments. Of these shipments, approximately 4% were hazardous, and of these, slightly over 1% (over 6,400 shipments) were radioactive. Because of DOE`s cleanup activities, the total quantities and percentages of radioactive material (RAM) that must be moved from one site to another is expected to increase in the coming years, and these materials are likely to be different than those shipped in the past. Irradiated fuel will certainly be part of the mix as will RAM samples and waste. However, in many cases these materials will be of different shape and size and require a transport packaging having different shielding, thermal, and criticality avoidance characteristics than are currently available. This Handbook provides guidance on the design, testing, certification, and operation of packages for these materials.

Shappert, L.B.; Bowman, S.M. [Oak Ridge National Lab., TN (United States); Arnold, E.D. [Lockheed Martin Energy Systems, Oak Ridge, TN (United States)] [and others

1998-08-01T23:59:59.000Z

117

Maintenance  

Science Conference Proceedings (OSTI)

Higher oil and labour costs, plus low quality fuel, demand that management takes a closer look at diesel engine lubrication. Problems of corrosion due to sulphur containing acids, oil analysis in order that it can be changed when necessary, filter analysis, use of multi-viscosity oil, and storage of oils are considered. A comprehensive lubricant conservation programme can reduce maintenance, labour costs and equipment downtime. Cleaning and replacement of bearings are discussed. Managing tire costs is also described.

Not Available

1981-06-01T23:59:59.000Z

118

Maintenance Issues Related to Operation of HTLS Conductors  

Science Conference Proceedings (OSTI)

The new High-Temperature Low-Sag conductors (HTLS) are used to raise current capacity of an existing transmission line. As the use of these conductors increases, it is crucial to address some of the outstanding issues that arise with these conductors. One such issue, as revealed during a field demonstration carried out by EPRI to gain experience on the design and handling of this type of conductors, is conductor maintenance. HTLS conductors are more complex than conventional Aluminum Conductor Steel Rein...

2008-12-02T23:59:59.000Z

119

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.  

DOE Green Energy (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

120

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.  

DOE Green Energy (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Simulation of wind farm operations and maintenance using discrete event system specification  

Science Conference Proceedings (OSTI)

Wind farms provide a source of clean and renewable energy. However, unlike many industries where machines are operated under more or less static conditions, wind turbines suffer from stochastic loading due to the hourly or seasonal variation of wind ... Keywords: DEVS, condition-based maintenance, renewable energy, scheduled maintenance, wind turbine

Eunshin Byon; Eduardo Pérez; Yu Ding; Lewis Ntaimo

2011-12-01T23:59:59.000Z

122

Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

123

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems  

E-Print Network (OSTI)

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

1996-01-01T23:59:59.000Z

124

Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem, Thornhollow and Pendleton satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam and South Fork Walla Walla facilities are used for holding and spawning chinook salmon. In some years, Three Mile Dam may also be used for holding and spawning coho salmon. In the spring of 2002, summer steelhead were acclimated and released at Bonifer Pond (54,917), Minthorn Springs (47,521), and Pendleton (54,366). Yearling coho (1,621,857) were also acclimated and released at Pendleton. Yearling spring chinook salmon (876,121) were acclimated and released at Imeques C-mem-ini-kem. At Thornhollow, 520,564 yearling fall chinook and 307,194 subyearling fall chinook were acclimated. In addition, 104,908 spring chinook were transported to Imeques C-mem-ini-kem in November for release in the spring of 2003. CTUIR and ODFW personnel monitored the progress of outmigration for juvenile releases at the Westland Canal juvenile facility. Nearly all juveniles released in the spring migrated downstream prior to the trap being opened in early July. A total of 100 unmarked and 10 marked summer steelhead were collected for broodstock at Three Mile Dam from September 21, 2001, through April 2, 2002. An estimated 180,955 green eggs were taken from 36 females and were transferred to Umatilla Hatchery for incubation and rearing. A total of 560 adult and 26 jack spring chinook salmon were collected for broodstock at Three Mile Dam from April 22 through June 12, 2002, and were transported to South Fork Walla Walla. An estimated 1,017,113 green eggs were taken from 266 females and were transferred to Umatilla Hatchery. Excess unmarked broodstock (seven adult males, five jacks, and 34 females) were released into the South Fork Walla Walla River at the end of spawning. A total of 168 adult and eight jack spring chinook salmon were transferred from Three Mile Dam to South Fork Walla Walla between June 6 and June 23 for temporary holding. On August 8, 154 adults and eight jacks were released into the South Fork Walla Walla River to spawn naturally. A total of 214 adult spring chinook salmon were transferred from Ringold Hatchery to South Fork Walla Walla between June 7 and June 20 for temporary holding. On August 8, 171 were released into natural production areas in the Walla Walla River basin to spawn naturally. A total of 525 adult and 34 jack fall chinook salmon were collected and held for broodstock at Three Mile Dam from September 16 to November 17, 2002. An estimated 678,122 green eggs were taken from 183 females. The eggs were transferred to Umatilla Hatchery. Coho salmon broodstock were not collected in 2002. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and spring and fall chinook salmon broodstock for monitoring and evaluation purposes. Infectious hematopoietic necrosis virus (IHNV) was detected in five of 68 spawned summer steelhead. Summer steelhead were not examined for bacterial kidney disease (Renibacterium salmoninarum; BKD) in 2002. Infectious hematopoietic necrosis virus was detected in 27 of 78 spawned spring chinook females. Two hundred sixty-six spawned spring chinook females were sampled for BKD and two had low to moderate levels of Rs antigen (ELISA OD{sub 405} readings of 0.260 and 0.365). All others had low to negative levels of Rs antigen (ELISA OD{sub 405} readings of 0.00 to 0.099). Twenty-one spring chinook mortalities were examined for culturable bacteria and enteric redmouth disease

Rowan, Gerald

2003-05-01T23:59:59.000Z

125

Maintenance and operation of the US Alternative Fuel Center  

DOE Green Energy (OSTI)

The Alternative Fuels Utilization Program (AFUP) of the Office of Energy Efficiency and Renewable Energy has investigated the possibilities and limitations of expanded scope of fuel alternatives and replacement means for transportation fuels from alternative sources. Under the AFUP, the Alternative Fuel Center (AFC) was created to solve problems in the DOE programs that were grappling with the utilization of shale oil and coal liquids for transportation fuels. This report covers the first year at the 3-year contract. The principal objective was to assist the AFUP in accomplishing its general goals with two new fuel initiatives selected for tasks in the project year: (1) Production of low-sulfur, low-olefin catalytically cracked gasoline blendstock; and (2) production of low-reactivity/low-emission gasoline. Supporting goals included maintaining equipment in good working order, performing reformulated gasoline tests, and meeting the needs of other government agencies and industries for fuel research involving custom processing, blending, or analysis of experimental fuels.

Erwin, J.; Ferrill, J.L.; Hetrick, D.L. [Southwest Research Inst., San Antonio, TX (United States)

1994-08-01T23:59:59.000Z

126

Decision support for operations and maintenance (DSOM) system  

DOE Patents (OSTI)

A method for minimizing the life cycle cost of processes such as heating a building. The method utilizes sensors to monitor various pieces of equipment used in the process, for example, boilers, turbines, and the like. The method then performs the steps of identifying a set optimal operating conditions for the process, identifying and measuring parameters necessary to characterize the actual operating condition of the process, validating data generated by measuring those parameters, characterizing the actual condition of the process, identifying an optimal condition corresponding to the actual condition, comparing said optimal condition with the actual condition and identifying variances between the two, and drawing from a set of pre-defined algorithms created using best engineering practices, an explanation of at least one likely source and at least one recommended remedial action for selected variances, and providing said explanation as an output to at least one user.

Jarrell, Donald B. (Kennewick, WA); Meador, Richard J. (Richland, WA); Sisk, Daniel R. (Richland, WA); Hatley, Darrel D. (Kennewick, WA); Brown, Daryl R. (Richland, WA); Keibel, Gary R. (Richland, WA); Gowri, Krishnan (Richland, WA); Reyes-Spindola, Jorge F. (Richland, WA); Adams, Kevin J. (San Bruno, CA); Yates, Kenneth R. (Lake Oswego, OR); Eschbach, Elizabeth J. (Fort Collins, CO); Stratton, Rex C. (Richland, WA)

2006-03-21T23:59:59.000Z

127

A survey of HVDC operating and maintenance practices and their impact on reliability and performance  

Science Conference Proceedings (OSTI)

A questionnaire about operating, maintenance, and spare parts practices and station performance was sent to all HVDC converter stations worldwide. This survey is sponsored by IEEE Working Groups 15.05.08, Economics and Operating Strategies, and I7, Reliability of HVDC Converter Stations. Responses from 38 stations are analyzed, and information bout the most popular practices is reported. One important conclusion is that energy contracts, ac system constraints, and dedicated generation frequency have strong influences on the operation and maintenance practices of HVDC stations. A search is made for correlations between the operating, maintenance, and spare parts practices, including spending, and the stations` performance and availability. No conclusions about the most cost-effective practices can be made. The results are compared with those of a study published in 1992 which covered a few of the same topics.

Cochrane, J.J.; Emerson, M.P. [New England Power Co., Ayer, MA (United States); Donahue, J.A. [New England Power Service Co., Westborough, MA (United States); Wolf, G. [Public Service of New Mexico, Albuquerque, NM (United States)

1996-01-01T23:59:59.000Z

128

Fire safety for your wood-burning appliance: tips for proper installation, operation, and maintenance  

Science Conference Proceedings (OSTI)

A dramatic increase in house fires caused by wood-burning appliances has accompanied the rediscovery of wood as an alternative heating fuel. The National Bureau of Standards attributed the majority of these fires to conditions related to the installation, operation or maintenance of the appliances rather than malfunctions or construction defects. This publication presents guidelines for the proper installation, use, and maintenance of wood-burning appliances in the home. (DMC)

Not Available

1984-01-01T23:59:59.000Z

129

Technologies for Plant Operations and Maintenance Support: A Plan for Technology Development and Implementation  

Science Conference Proceedings (OSTI)

Electronic performance support systems (EPSSs) have important potential for increasing the efficiency and quality of operations and maintenance (O&M) work. This report cites a series of rapidly evolving technologies for possible application in nuclear power plants, including technologies that can assist in the shrinking workforce problem for the nuclear power industry. Also included is a futuristic scenario of a maintenance technician using several of these new technologies to perform daily tasks efficie...

2002-03-25T23:59:59.000Z

130

Standard Hydrogen Monitoring System-C operation and maintenance manual  

DOE Green Energy (OSTI)

The primary function of the SHMS-C is to monitor specifically for hydrogen in the waste tank vapor space which may also contain (but not be limited to) unknown quantities of air, nitrous oxide (N{sub 2}O), ammonia (NH{sub 3}), water vapor, carbon dioxide (CO{sub 2}), carbon monoxide (CO) and other gaseous constituents. An electronically controlled grab sampler has replaced the manually operated sample system that was used in the original SHMS enclosure. Samples can now be operator or automatically initiated. Automatic initiation occurs based on the high hydrogen alarm level. Once a sample is obtained it is removed from the sampler and transported to a laboratory for analysis. This system is used to identify other gaseous constituents which are not measured by the hydrogen monitor. The design does not include any remote data acquisition or remote data logging equipment but provides a 4--20 mA dc process signals, and discrete alarm contacts, that can be utilized for remote data logging and alarming when desired. The SHMS-C arrangement consists of design modifications (piping, valves, filters, supports) to the SHMS-B arrangement necessary for the installation of a dual column gas chromatograph and associated sample and calibration gas lines. The gas chromatograph will provide real time, analytical quality, specific hydrogen measurements in low and medium range concentrations. The system is designed to sample process gases that are classified by NEC code as Class 1, Division 1, Group B.

Schneider, T.C.

1997-05-01T23:59:59.000Z

131

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

� � Glossary of Common Terms � Appendix A Glossary of Common Terms Absorption chiller - A refrigeration machine using heat as the power input to generate chilled water. Adjustable speed drive - A means of changing the speed of a motor in a step-less manner. In the case of an AC motor, this is accomplished by varying the frequency. Aerator - A device installed in a faucet or showerhead that adds air to the water flow, thereby maintaining an effective water spray while reducing overall water consumption. Air changes - Replacement of the total volume of air in a room over a period of time (e.g., 6 air changes per hour). Ambient temperature - The temperature of the air surrounding an object. Ballast - A device used to supply the proper voltage and limit the current to operate one or more

132

Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.  

Science Conference Proceedings (OSTI)

The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

Rowan, Gerald D.

1996-05-01T23:59:59.000Z

133

Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants  

DOE Green Energy (OSTI)

This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

1999-06-01T23:59:59.000Z

134

Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

11.4 11.4 Planning and Reporting for O&M in Federal ESPCs Planning and Reporting for Operations & Maintenance in Federal Energy Saving Performance Contracts Prepared by: Operations and Maintenance Working Group Approved by: Federal ESPC Steering Committee M&V - 3 Planning and Reporting for O&M in Federal ESPCs CONTENTS 1. INTRODUCTION AND OVERVIEW ...................................................................... 1 1.1 OVERVIEW OF O&M ISSUES IN ESPCS ................................................................... 1 1.1.1 Key Issues, Timing, and Available Guidance on O&M in Federal ESPCs .................................................................................................................. 2 2. STEPS OF MANAGING O&M RESPONSIBILITIES ........................................... 3

135

Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11.4 11.4 Planning and Reporting for O&M in Federal ESPCs Planning and Reporting for Operations & Maintenance in Federal Energy Saving Performance Contracts Prepared by: Operations and Maintenance Working Group Approved by: Federal ESPC Steering Committee M&V - 3 Planning and Reporting for O&M in Federal ESPCs CONTENTS 1. INTRODUCTION AND OVERVIEW ...................................................................... 1 1.1 OVERVIEW OF O&M ISSUES IN ESPCS ................................................................... 1 1.1.1 Key Issues, Timing, and Available Guidance on O&M in Federal ESPCs .................................................................................................................. 2 2. STEPS OF MANAGING O&M RESPONSIBILITIES ........................................... 3

136

Operation and Maintenance of the National Radiobiology Archives  

SciTech Connect

The National Radiobiology Archives (NRA) are an archival program, started in 1989, to collect, organize and maintain data, laboratory notebooks, and animal tissue specimens from government (Department of Energy and its predecessor agencies) sponsored radiobiology life-span animal studies. These unique records, histopathology slides and paraffin embedded tissue blocks are maintained in a central facility and are available for further research study. The materials include electronic and paper records for each of more than 6,000 life-span-observations on dogs as well as details of major studies involving nearly 30,000 mice. Although these studies were performed over many years and at different laboratories with differing data management systems, the NRA has translated them into a standardized set of relational database tables. These can be distributed to interested individuals on written request. Specific Aims are: (1) To Maintain the Archive of Written Records from the Animal Experiments - The USTUR continued to maintain the NRA archives which consist of approximately 175 storage boxes containing laboratory notebooks, animal exposure records, animal pathologic records, and radiographs. These were stored in a 6,000 square foot leased facility in Richland, WA. Additionally, through a collaboration with Pacific Northwest National Laboratory's (PNNL) Low Dose Program, many of these records were scanned into digital files. These totaled 34 GB of data, which are saved in 2,407 separate PDF files that are organized by box number and animal identification number. (2) To Maintain the Archive of Animal Tissues at Washington State University - The USTUR continued to house the NRA dog tissue collection in the leased facility. The NRA tissue collection consisted of pathology slides and tissue blocks. Approximately 25% of the laboratory facility was dedicated to the storage of the NRA materials. (3) To Organize the Datasets of These Animals in the Context of Other Datasets so That They Can be Used by the Scientific Community at Large - As was reported in the FY2009 NRA progress report, Dr. Chuck Watson (NRA Database Consultant) completed his service as the US representative on the European Radiobiological Archives (ERA) Advisory Board during FY2009. Unfortunately, due to the lack of financial support during FY2010, the NRA was not able to make further contributions to the ERA's efforts.

Dr. Anthony C. James; Stacey L. McCord

2012-03-07T23:59:59.000Z

137

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

DOE Green Energy (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

138

SUBJECT: Insights and Implications of Steam Generator Operating, Inspecting and Maintenance Experience  

E-Print Network (OSTI)

The steam generator tube failure event at Indian Point Unit 2 and the potential issues surrounding the in-situ pressure testing of selected tubes and test specimens at Arkansas Nuclear One Unit 2, prompted industry to evaluate its generic steam generator guidelines, plant experiences, and insights gained from the periodic steam generator program review visits conducted by the Institute of Nuclear Power Operations (INPO). The purpose of this letter is to share with the NRC staff the industry conclusions and actions taken. As the NRC staff is well aware, the operation, inspection, and maintenance of steam generators are a high industry priority. Given the critical role of the steam generator in providing safe, reliable, and economic power production, steam generator performance has received broad industry attention for years. Generic industry activities, managed by EPRI, have been underway continuously since 1978. NRC staff is familiar with those efforts based on past briefings on the activities of the EPRI Steam Generator Management Program (SGMP) and attendance at selected SGMP workshops. More recently, other industry support organizations, such as NEI, INPO, and NSSS Owners Groups, have played important roles as well. Industry data indicates continual improvement in steam generator performance since the initiation of these efforts.

David J. Modeen; Dr. Brian; W. Sheron

2000-01-01T23:59:59.000Z

139

Control software architecture and operating modes of the Model M-2 maintenance system  

SciTech Connect

The Model M-2 maintenance system is the first completely digitally controlled servomanipulator. The M-2 system allows dexterous operations to be performed remotely using bilateral force-reflecting master/slave techniques, and its integrated operator interface takes advantage of touch-screen-driven menus to allow selection of all possible operating modes. The control system hardware for this system has been described previously. This paper describes the architecture of the overall control system. The system's various modes of operation are identified, the software implementation of each is described, system diagnostic routines are described, and highlights of the computer-augmented operator interface are discussed. 3 references, 5 figures.

Satterlee, P.E. Jr.; Martin, H.L.; Herndon, J.N.

1984-04-01T23:59:59.000Z

140

Potential Operation and Maintenance (O&M) Savings at the Dunbar Middle and Sims Elementary Schools  

E-Print Network (OSTI)

This report presents the results of a study of the potential cost savings which may be achieved by improving operational and maintenance (O&M) practices at Dunbar Middle School and Sims Elementary School in the Fort Worth Independent School District. This report discusses the methodology used to identify the O&M measures and summarizes the potential savings of these measures.

Liu, M.; Houcek, J. K.; Claridge, D. E.; Haberl, J. S.

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Operations and Maintenance Practices in Small-to-Medium Commercial Buildings  

Science Conference Proceedings (OSTI)

In order to maintain smooth and efficient operations, businesses conduct and contract for many different products and services. Services related to energy-oriented equipment servicing, maintenance, and repair are particularly critical and represent a market that holds potential for energy providers to expand product and service offerings.

1998-11-30T23:59:59.000Z

142

Nuclear Maintenance Applications Center: Air-Operated Valve Diagnostic Testing Guide  

Science Conference Proceedings (OSTI)

This report provides information for personnel involved in the performance of air-operated valve (AOV) diagnostic testing, including the benefits of using diagnostics to understand valve health and to tie information into preventive maintenance programs. It provides insights for experienced personnel as well as basic information, guidance, and instructions for personnel assigned to perform, analyze, or purchase diagnostic test equipment.

2011-12-23T23:59:59.000Z

143

Optimal maintenance policies for systems subject to a Markovian operating environment  

Science Conference Proceedings (OSTI)

Many stochastic models of repairable equipment deterioration have been proposed based on the physics of failure and the characteristics of the operating environment, but they often lead to time to failure and residual life distributions that are quite ... Keywords: Condition-based maintenance, Dynamic environment, Stochastic degradation

Yisha Xiang; C. Richard Cassady; Edward A. Pohl

2012-02-01T23:59:59.000Z

144

Proceedings of symposium on operation and maintenance of synthetic gas plants  

SciTech Connect

The Symposium on Operation and Maintenance of Synthetic Gas Plants sponsored by the Gas Processors Association and the American Petroleum Institute (Division of Refining) was held at the Statler Hilton Hotel, Dallas, Texas, October 10, 1973. Four papers have been entered individually into EDB. (LTN)

1973-01-01T23:59:59.000Z

145

Site data acquisition subsystem (SDAS) Mod 1, installation, operation, and maintenance manual  

DOE Green Energy (OSTI)

The Site Data Acquisition Subsystem (SDAS) Mod 1 is designed to collect sensor measurement data from a solar energy demonstration site. A brief description of the SDAS is given and the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem are defined.

Not Available

1977-10-29T23:59:59.000Z

146

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

147

Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see Table 5). Purchases are itemized in Appendix D and E. FishPro, Inc. assisted tribal staff with equipment purchases. The unspent contract balances will be carried forward to the ensuing year to complete equipment purchases essential to hatchery operations. The NPTH activities focused on completion of the Northwest Power Planning Council Step-3 decision that authorized hatchery construction. Construction began in July 2000. It is anticipated to continue through October 2002. At the end of 2001, the hatchery facilities were approximately 70% completed and the budget approximately 90% expended. The following facilities are either completed or in final stages of construction: (1) NPTH Central Hatchery facility at Site 1705, and (2) North Lapwai Valley satellite, and (3) Sweetwater Springs satellite, and (4) Yoosa-Camp satellite, and (5) Newsome Creek satellite, and (6) Lukes Gulch satellite, and (7) Cedar Flats satellite.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2006-03-01T23:59:59.000Z

148

Functional Specification: Operations and Maintenance Excellence PlantView Risk Assessment Module Modifications  

Science Conference Proceedings (OSTI)

This report specifies changes to the Risk module of the PlantView software as part of the Electric Power Research Institute's (EPRI's) Operations and Maintenance Excellence (OMX) initiative. The proposed concept for a risk-informed fossil plant maintenance module builds on previous EPRI research and development that has produced applications such as REaP, LP Rim Life, Turbo-X, Boiler-OIO, and the PlantView Risk Assessment module. Risk assessment will then be more effectively integrated with other key pro...

2010-07-28T23:59:59.000Z

149

How to Determine and Verify Operating and Maintenance (O&M) Savings in Federal Energy Savings Performance Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Determine and Verify Determine and Verify Operating and Maintenance (O&M) Savings in Federal Energy Savings Performance Contracts November 2007 Prepared by: Operations and Maintenance Saving Determination Working Group Approved by: Federal ESPC Steering Committee Table of Contents 1. INTRODUCTION............................................................................................................................... 3 1.1 BACKGROUND.............................................................................................................................. 4 1.2 EXISTING GUIDANCE.................................................................................................................... 4 2. M&V APPROACH.............................................................................................................................

150

How to Determine and Verify Operating and Maintenance (O&M) Savings in Federal Energy Savings Performance Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determine and Verify Determine and Verify Operating and Maintenance (O&M) Savings in Federal Energy Savings Performance Contracts November 2007 Prepared by: Operations and Maintenance Saving Determination Working Group Approved by: Federal ESPC Steering Committee Table of Contents 1. INTRODUCTION............................................................................................................................... 3 1.1 BACKGROUND.............................................................................................................................. 4 1.2 EXISTING GUIDANCE.................................................................................................................... 4 2. M&V APPROACH.............................................................................................................................

151

Integrated Operations and Maintenance of Fossil Plant Systems: System Health Reporting  

Science Conference Proceedings (OSTI)

As budget margins for operations and maintenance programs become tighter, the need for fully integrated, streamlined programs becomes more essential. Organizations are being required to function more efficiently and effectively despite having their budget and personnel resources significantly reduced. Newly developed technology, especially information technology, has played a key role in assisting power-producing organizations as they strive to develop strategic management plans for their existing assets...

2009-12-21T23:59:59.000Z

152

Reducing Operations and Maintenance Costs of Nuclear Power Plant Fire Protection Programs  

Science Conference Proceedings (OSTI)

This report discusses opportunities for utilities to reduce fire protection operations and maintenance (O&M) costs. A number of these opportunities have been implemented by some utilities and can be implemented now by others. Other opportunities can be implemented in the short term with some additional development. These other opportunities are amenable to cooperative projects with costs shared by multiple utilities. There is also a group of opportunities that are probably best developed on an industry w...

1997-01-08T23:59:59.000Z

153

Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility  

SciTech Connect

This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

JANIN, L.F.

2000-08-30T23:59:59.000Z

154

Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility  

Science Conference Proceedings (OSTI)

The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

2011-07-25T23:59:59.000Z

155

Combustion Turbine/Combined-Cycle Operations and Maintenance Cost Analyzer, Version 8.61  

Science Conference Proceedings (OSTI)

The CTCC O&M Cost Analyzer is a spreadsheet software product that estimates operations and maintenance (O&M) costs for combustion turbine and combined-cycle plants for specific gas turbine models over the operating life of the asset The CTCC O&M Cost Analyzer software contains powerful capabilities to assist users in evaluating non-fuel O&M costs and in supporting a life-cycle cost evaluation perspective.  The software uses a "bottoms-up" approach for ...

2013-05-06T23:59:59.000Z

156

Two Years of Operational Hurricane Synoptic Surveillance  

Science Conference Proceedings (OSTI)

In 1997, the National Hurricane Center and the Hurricane Research Division began operational synoptic surveillance missions with the Gulfstream IV-SP jet aircraft to improve the numerical guidance for hurricanes that threaten the continental ...

Sim D. Aberson

2002-10-01T23:59:59.000Z

157

Guide for Operation & Maintenance of Paper-Insulated Transmission Cables: Part 1  

Science Conference Proceedings (OSTI)

U.S. utilities have more than $20 billion invested in underground transmission cables, the majority of which employ fluid-impregnated paper insulation. Due to the advancing age of these cables and the rapidly emerging competitive utility business climate, it is all the more important to protect this investment through proper operations and maintenance (O&M). Part 1 of this guide describes the various cable systems, O&M through noninvasive testing of the dielectric system, and invasive tests on the cable'...

2000-12-13T23:59:59.000Z

158

Near-term electric vehicle program. Phase II. Operation and maintenance manual  

DOE Green Energy (OSTI)

A detailed description of the design, operation, and maintenance of the Integrated Test Vehicle (ITV) including instruments and controls, economy, safety and security, troubleshooting, and specifications is given. The ITV employs a dc traction motor and 18 lead-acid batteries which provide a nominal voltage of 108 Vdc. A microcomputer controls many vehicle electrical functions. The ITV is a four-passenger subcompact weighing 3320 lb curb weight with the capacity of carrying a 600 lb payload. The driving range is 75 miles on urban cycle, and the vehicle is equipped with a regenerative braking system. (WHK)

Not Available

1979-11-01T23:59:59.000Z

159

Reevaluation of IEEE and IEC Substation Design, Operations, and Maintenance Standards Considering Increased Fault Currents  

Science Conference Proceedings (OSTI)

The ever-increasing demand for utility substations to pass higher and higher levels of throughput power has the consequence of driving up levels of short circuit (SC) currents from 63 kA to as high as 100 kA. Knowing whether substation bus structures and electrical equipment are capable of safely passing these higher levels of currents is a pressing need of substation personnel responsible for design, operation, and maintenance of station assets. This report presents results of a preliminary study ...

2012-12-04T23:59:59.000Z

160

INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS  

SciTech Connect

On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

JOLLEY, WENDELL L

2008-02-05T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy  

DOE Green Energy (OSTI)

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

2013-07-01T23:59:59.000Z

162

INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS  

SciTech Connect

On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

JOLLEY, WENDELL L

2008-02-05T23:59:59.000Z

163

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012  

SciTech Connect

This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate2 subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features3), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

None

2013-03-01T23:59:59.000Z

164

Maintenance and operation of a small wind generator in the marine environment. Final report  

SciTech Connect

This report discusses the maintenance and operation of a wind-turbine generator that has been undergoing tests as a source of energy for remote Coast Guard lighthouses. The report documents both the effects of operating the wind machine in the marine environment and the maintenance that it required. Design parameters and performance records of the generator are also evaluated. The HR2 is a horizontal-axis, upwind-oriented, three-bladed wind machine. It is equipped with a direct-drive system that allows the kinetic force captured by the propeller to be converted directly into rotational force driving the main shaft. The HR2 alternator and blade/hub system are allowed to tilt out of a near-vertical plane about a shaft and bearing mechanism. The VARCS is a torsion spring- and hinge-mechanism that acts against the lifting dynamics of the spinning blades. As high winds or gusts tilt the alternator about the hinge, the VARCS's spring opposes this force and regulates the blades angle of attack into the wind; the propeller's RPM drop when tilted because of the feathering action. If the wind subsides, the force of the VARCS spring drives the alternator assembly down and presents the blades back into the wind.

Heerlein, W.

1986-07-01T23:59:59.000Z

165

Advanced spent fuel conditioning process (ACP) progress with respect to remote operation and maintenance  

Science Conference Proceedings (OSTI)

Korea Atomic Energy Research Institute (KAERI) has been developing an Advanced Spent Fuel Conditioning Process (ACP) to reduce the volume of spent fuel, and the construction of the ACP facility (ACPF) for a demonstration of its technical feasibility has been completed. In 2006 two inactive demonstrations were performed with simulated fuels in the ACPF. Accompanied by process equipment performance tests, its remote operability and maintainability were also tested during that time. Procedures for remote operation tasks are well addressed in this study and evaluated thoroughly. Also, remote maintenance and repair tasks are addressed regarding some important modules with a high priority order. The above remote handling test's results provided a lot of information such as items to be revised to improve the efficiency of the remote handling tasks. This paper deals with the current status of ACP and the progress of remote handling of ACPF. (authors)

Lee, Hyo Jik; Lee, Jong Kwang; Park, Byung Suk [NURE Lab, KAERI: 1045 Daedeokdaero, Daejeon, 305-353 (Korea, Republic of); Yoon, Ji Sup [Spent Fuel Technology Development Division, KAERI: 1045 Daedeokdaero, Daejeon, 305-353 (Korea, Republic of)

2007-07-01T23:59:59.000Z

166

Operational experience and maintenance programs of Transamerica Delaval, Inc., diesel generators  

DOE Green Energy (OSTI)

Concerns regarding the reliability of large-bore, medium-speed diesel generators manufactured by Transamerica Delaval, Inc. (TDI) for application at domestic nuclear plants were first prompted by a crankshaft failure at Shoreham Nuclear Power Station in August 1983. A number of diesel generator components were identified which had potential deficiencies from a manufacturing and operational standpoint. In response to these problems, 11 (now 8) U.S. nuclear utility owners formed a TDI Diesel Generator Owners Group (Owners Group) to address operational and regulatory issues relative to diesel generator sets used for standby emergency power. The Owners` Group performed extensive design reviews of all key engine components and developed recommendations to be implemented by the individual owners concerning needed component replacements and modifications, component inspections to validate the {open_quotes}as-manufactured{close_quotes} and {open_quotes}as-assembled{close_quotes} quality of key engine components, engine testing, and an enhanced maintenance and surveillance program.

Rajan, J.R.

1994-05-01T23:59:59.000Z

167

Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-02-01T23:59:59.000Z

168

Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2004 Annual Operation Plan, 2003 Annual Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

Harty, Harold R.; Penney, Aaron K.; Larson, Roy Edward (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

169

Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report  

Energy.gov (U.S. Department of Energy (DOE))

LTS–O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011–2020 Strategic Plan (DOE 2011).

170

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

2004-11-01T23:59:59.000Z

171

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

DOE Green Energy (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

172

Energy savings from operation and maintenance training for apartment boiler heating systems  

SciTech Connect

The Portland Energy Office provided operation and maintenance (O M) training to the operators of boiler heating systems for ten low-income apartment complexes in the Fall of 1990. This study tracked energy usage before and after O M training to see if savings occurred. Training was provided on both weatherized and non-weatherized apartments to find out if weatherization impacted the amount of O M savings to be obtained. Also, energy savings from the O M training and building shell weatherization are compared. The O M training averaged about four hours per building. Content was adjusted at each site to match needs of the boiler and operator. The Energy Office also provided a boiler tune-up by a service technician. The training stressed low-cost and no-cost measures which operators could either do themselves or hire service help to implement. It also emphasized boiler safety. Nine of the ten apartment complexes in the study used less energy per heating degree-day after the O M help. Average savings were 10%. Four apartments chosen randomly as controls had negative savings; they used slightly more energy during the same post-O M time frame. Weatherized and unweatherized apartments showed similar savings after the O M help, 10% and 11% percent respectively. Savings from weatherization of six of the apartments in the winter of 1988--1989 were also measured. A low average of only 4% was observed, reflecting negative savings in two buildings.

1992-02-01T23:59:59.000Z

173

Results from the second year of operation of the federal methanol fleet at Lawrence Berkeley Laboratory  

DOE Green Energy (OSTI)

This interim report describes the second year's operation of the methanol fleet at Lawrence Berkeley Laboratory (LBL) in Berkeley, California. The fleet consists of five 1984 methanol-fueled Chevrolet Citation sedans paired with five comparable gasoline-fueled Citations for comparison. Data have been collected and tabulated on fuel consumption, maintenance records, oil sample analyses, and driver perceptions of vehicle operability. Fuel efficiency was slightly improved as compared to the first year for both the methanol and gasoline vehicles. The methanol vehicles continued to experience slightly less energy efficiency than the gasoline vehicles. Maintenance data reveal that the methanol vehicles required substantially more service than the gasoline vehicles, which may be due partially to a greater sensitivity on the part of users about methanol vehicle problems. Oil sample analyses revealed that engine wear rates are lower for the second year as compared to the first year and are probably not cause for great alarm. Drivers still rate all of the vehicles quite highly, but the methanol vehicles were rated not as highly during the second year of operation as in the first year. 5 refs., 1 figs., 16 tabs.

McGill, R.N.; Hillis, S.L.

1988-08-01T23:59:59.000Z

174

Recursive operation time maximization model for the maintenance of power generation equipment  

Science Conference Proceedings (OSTI)

Repairable equipment requires preventive maintenance (PM) to maintain proper function. An appropriate PM strategy can extend the life of equipment and reduce variable costs. A power generation company in Taiwan that has a fixed-period PM strategy is ... Keywords: Maintenance improvement factor, Mathematical programming, Preventive maintenance (PM)

Der-Chiang Li; Chiao-Wen Liu; Tung-Liang Chen

2012-05-01T23:59:59.000Z

175

Finance Human Resources & Training Information Systems Director Director Director Technology Officer Operations & Maintenance  

E-Print Network (OSTI)

Maintenance Construction Project Management 982-5048 or esm3e Recycling Annette Cyphers Richard Barbour Safety-5891 or ltw Systems Control Center 982-5876 or pgz5z Health System Research Zone 2 Maintenance 982-4776 or bks Administration Zone 3 Maintenance Mike Merriam Sally Fields Will Schnorr Utility Systems Jeff Moore, P.E. David

Acton, Scott

176

Review of Operation and Maintenance Experience in the DOE-EPRI Wind Turbine Verification Program  

DOE Green Energy (OSTI)

All the projects within the US Department of Energy (DOE) Electrical Power Research Institute (EPRI) Wind Turbine Verification Program (TVP) are now in operation. As a result, the emphasis of the owners and operators has shifted from installation and commissioning to a focus on optimizing the operation and maintenance (O and M) activities of the projects. Each project utilizes a unique strategy for performing O and M. O and M personnel for projects in Searsburg, Vermont; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; Kotzebue, Alaska; and Big Spring, Texas include on-site vendor representatives, dedicated utility personnel, and utility personnel who split their time between the wind turbines and other utility responsibilities. Each project has its own set of priorities for balancing turbine availability against safety, minimizing overtime pay, and other utility responsibilities. Various strategies have also been employed to ensure access to tools and spare parts. This paper compares and contrasts the various O and M strategies at TVP projects and reviews the causes of turbine downtime and the frequency and duration of faults.

Conover, K.; VandenBosche, J.; Rhoads, H. (Global Energy Concepts, LLC); Smith, B. (National Renewable Energy Laboratory)

2000-09-05T23:59:59.000Z

177

An analysis of the impacts of economic incentive programs on commercial nuclear power plant operations and maintenance costs  

SciTech Connect

Operations and Maintenance (O and M) expenditures by nuclear power plant owner/operators possess a very logical and vital link in considerations relating to plant safety and reliability. Since the determinants of O and M outlays are considerable and varied, the potential linkages to plant safety, both directly and indirectly, can likewise be substantial. One significant issue before the US Nuclear Regulatory Commission is the impact, if any, on O and M spending from state programs that attempt to improve plant operating performance, and how and to what extent these programs may affect plant safety and pose public health risks. The purpose of this study is to examine the role and degree of impacts from state promulgated economic incentive programs (EIPs) on plant O and M spending. A multivariate regression framework is specified, and the model is estimated on industry data over a five-year period, 1986--1990. Explanatory variables for the O and M spending model include plant characteristics, regulatory effects, financial strength factors, replacement power costs, and the performance incentive programs. EIPs are found to have statistically significant effects on plant O and M outlays, albeit small in relation to other factors. Moreover, the results indicate that the relatively financially weaker firms are more sensitive in their O and M spending to the presence of such programs. Formulations for linking spending behavior and EIPs with plant safety performance remains for future analysis.

Kavanaugh, D.C.; Monroe, W.H. [Pacific Northwest Lab., Richland, WA (United States); Wood, R.S. [Nuclear Regulatory Commission, Washington, DC (United States)

1996-02-01T23:59:59.000Z

178

Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

1995-06-01T23:59:59.000Z

179

FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2012 Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2012 Operational Plan FY2012 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

180

FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2011 Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2011 Operational Plan FY2011 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2009 Operational Plan FY2009 Operational Plan - Goal 1 Summary FY2009 Operational Plan - Goal 2 Summary

182

SURVEY OF OPERATION AND MAINTENANCE-RELATED MATERIALS NEEDS IN GEOTHERMAL POWER PLANTS  

SciTech Connect

A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views research and development priorities. A. wide range of opinions was obtained, reflecting each individual respondent's perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

ALLAN,M.L.

1998-06-01T23:59:59.000Z

183

Survey of operation and maintenance-related materials needs in geothermal power plants  

DOE Green Energy (OSTI)

A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views on research and development priorities. A wide range of opinions was obtained, reflecting each individual respondent`s perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

Allan, M.L.

1998-06-01T23:59:59.000Z

184

Method for including operation and maintenance costs in the economic analysis of active solar energy systems  

DOE Green Energy (OSTI)

For a developing technology such as solar energy, the costs for operation and maintenance (O and M) can be substantial. In the past, most economic analyses included these costs by simply assuming that an annual cost will be incurred that is proportional to the initial cost of the system. However, in assessing the economics of new systems proposed for further research and development, such a simplification can obscure the issues. For example, when the typical method for including O and M costs in an economic analysis is used, the O and M costs associated with a newly developed, more reliable, and slightly more expensive controller will be assumed to increase - an obvious inconsistency. The method presented in this report replaces this simplistic approach with a representation of the O and M costs that explicitly accounts for the uncertainties and risks inherent in the operation of any equipment. A detailed description of the data inputs required by the method is included as well as a summary of data sources and an example of the method as applied to an active solar heating system.

Short, W.D.

1986-08-01T23:59:59.000Z

185

SURVEY OF OPERATION AND MAINTENANCE-RELATED MATERIALS NEEDS IN GEOTHERMAL POWER PLANTS  

DOE Green Energy (OSTI)

A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views research and development priorities. A. wide range of opinions was obtained, reflecting each individual respondent's perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

ALLAN,M.L.

1998-06-01T23:59:59.000Z

186

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

187

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted  

E-Print Network (OSTI)

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted amount by a significant margin, the rates will be amended with a fuel surcharge at that time and the change notice will be posted in the fleet web site, rates page. Some rate

Sheridan, Jennifer

188

MAINTENANCE SHOP The shop manager, Clint Steffan has over 25 years experience in Electronic design, test, and repair in  

E-Print Network (OSTI)

MAINTENANCE SHOP The shop manager, Clint Steffan has over 25 years experience in Electronic design the capability of repairing most electronic, mechanical and electro-mechanical equipment, including refrigeration source for parts instead of buying from equipment manufacturer. Repair/recharge small refrigeration

Lajeunesse, Marc J.

189

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

DOE Green Energy (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

190

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

191

California State University Fullerton Part One Emergency Operations Plan Plan Development and Maintenance  

E-Print Network (OSTI)

coordinated with local government, state agencies, and with the CSU System. The CSU Office of Risk Management and Maintenance Emergency\\EOPlan2010\\Part1-9Plan Development & Maintenance.doc Rev Jan. 2010 33 Part 1.9 PLAN President for Administration and Finance. The campus Emergency Management Coordinator maintains this Plan

de Lijser, Peter

192

Operation, modification, and maintenance of DOE/PETC 700 H. P. Combustion Test Facility. Quarterly activity report, January 1, 1979--April 1, 1979  

SciTech Connect

Number six fuel oil tests, 30% COM tests, and 40% COM tests were conducted. Operation, modification, and maintenance of the combustion test facility is described. (LTN)

1979-01-01T23:59:59.000Z

193

Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance  

Science Conference Proceedings (OSTI)

This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following completion of the deactivation project. The deactivation project has removed or stabilized the hazardous materials within the facility structure and equipment to reduce the hazards posed by the facility during the surveillance and maintenance (S and M) period, and to reduce the costs associated with the S and M. This document serves as the authorization basis for the PUREX facility, excluding the storage tunnels, railroad cut, and associated tracks, for the deactivated end state condition during the S and M period. The storage tunnels, and associated systems and areas, are addressed in WHC-SD-HS-SAR-001, Rev. 1, PUREX Final Safety Analysis Report. During S and M, the mission of the facility is to maintain the conditions and equipment in a manner that ensures the safety of the workers, environment, and the public. The S and M phase will continue until the final decontamination and decommissioning (D and D) project and activities are begun. Based on the methodology of DOE-STD-1027-92, Hazards Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, the final facility hazards category is identified as hazards category This considers the remaining material inventories, form and distribution of the material, and the energies present to initiate events of concern. Given the current facility configuration, conditions, and authorized S and M activities, there are no operational events identified resulting in significant hazard to any of the target receptor groups (e.g., workers, public, environment). The only accident scenarios identified with consequences to the onsite co-located workers were based on external natural phenomena, specifically an earthquake. The dose consequences of these events are within the current risk evaluation guidelines and are consistent with the expectations for a hazards category 2 facility.

DODD, E.N.

1999-05-12T23:59:59.000Z

194

PROBLEMS ENCOUNTERED DURING FOUR YEARS OF ORR OPERATION  

SciTech Connect

The over-all design and operation of ORR is reviewed in the light of four years of operating experience. Items discussed consist of the reactor components and instrumentation, reactor and pool cooling systems (including system cleanup), the emergency systems for electric power and reactor cooling, the waste-disposal systems (liquid, gaseous, and solid), and the building, itself. The ORR was the first of a class of reactors which combined the features of both the pool-reactor and tank-reactor types. Four years of operation indicated areas where problems of various degrees have developed. These problems are discussed. (auth)

Tabor, W.H.; Costner, R.A. Jr.

1962-08-23T23:59:59.000Z

195

WIPP Marks 12 Years of Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks 12 Years of Operations Marks 12 Years of Operations WIPP Marks 12 Years of Operations March 28, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has now been 12 years since WIPP received its first shipment of transuranic (TRU) waste. TRU waste consists of clothing, tools, rags, debris, residues and other disposal items contaminated with radioactive elements - mostly plutonium. "WIPP employees and members of the community cheered when the first shipment of TRU waste arrived here in 1999," said Acting Carlsbad Field Office Manager Ed Ziemianski. "I applaud their continued dedication to our nation, which has placed its trust in WIPP to maintain those rigorous

196

Results from the first year of operation of the Federal Methanol Fleet at Argonne National Laboratory  

DOE Green Energy (OSTI)

The Oak Ridge National Laboratory, under the auspices of the Department of Energy's Alternative Fuels Utilization Program, has managed the Federal Methanol Fleet Project since its inception in fiscal year 1985. This congressionally-mandated project directed the Department of Energy to introduce methanol-fueled vehicles into civilian government fleet operations. This interim report describes the first year of operation of a methanol fleet at Argonne National Laboratory in Argonne, Illinois. The fleet consists of five methanol-fueled 1986 Chevrolet S-10 pickup trucks along with five Chevrolet S-10s for comparison, as well as five methanol-fueled 1986 Ford Crown Victorias paired with four gasoline Fords. Data have been collected and tabulated on fuel consumption, maintenance records, oil sample analyses, and driver perceptions of vehicle operability. Energy efficiency for the methanol vehicles was slightly greater than that for the counterpart gasoline vehicles. Maintenance records reveal that the methanol vehicles required substantially more service than the gasoline vehicles, but a large proportion of the difference was due to methanol component replacements where improvements or upgrades were scheduled to be implemented after the vehicles were in service. Oil sample analyses revealed that engine wear rates were higher in the methanol vehicles. Drivers indicated that the methanol vehicles are quite acceptable, but they rated the gasoline vehicles higher. The Argonne fleet serves as the cold-weather site of the Federal Methanol Fleet and, as such, the methanol vehicles have been outfitted with special systems to aid in cold-starting and driveability.

McGill, R.N.; Hillis, S.L.; Larsen, R.P.

1988-10-01T23:59:59.000Z

197

Operational and maintenance instruction manual for the Ingham County Geriatric Medical Care Facility solar water-heating system  

DOE Green Energy (OSTI)

The Ingham County solar system consists of approximately 10,000 square feet of solar collectors connected in a closed configuration loop. The primary loop solution is a 1:12 mixture of water and propylene glycol which flows through the tube side of a heat exchanger connected to the primary storage tank. The heat energy which is supplied to the primary storage tank is subsequently used to preheat the temperature of the laundry water, kitchen water, and domestic potable water. Included in this report are: detailed drawings and flow chart; operational methodology; preventive maintenance instructions; general instructions and safety precautions; and a corrective maintenance and tabulation of failure modes. Appendices include: manufacturers technical manual and component specifications; IBM data sensors and responsibilities; digital county monitor operations manual; and on site monitor operations manual. Reference CAPE-2834. (LS)

Not Available

1983-07-29T23:59:59.000Z

198

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011  

SciTech Connect

This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

None

2012-03-01T23:59:59.000Z

199

Main Generator Rotor Maintenance  

Science Conference Proceedings (OSTI)

Main generator rotors are constructed and designed to provide decades of reliable and trouble-free operation. However, a number of incidences have occurred over the years that can adversely impact reliable operation of generator rotors and, ultimately, production of electrical power. This report is a guide for power plant personnel responsible for reliable operation and maintenance of main generators. As a guide, this report provides knowledge and experience from generator experts working at power plants...

2006-11-27T23:59:59.000Z

200

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems: 2003 Edition  

Science Conference Proceedings (OSTI)

More than 100,000 MW of coal-fired generating capacity in the United States will be equipped with selective catalytic reduction (SCR) systems to meet the nitrogen oxides (NOx) limits called for in state implementation plans. In the year 2003, approximately 40,000 MW of capacity is expected to go into operation. Nearly 90,000 MW will be installed by 2004, and the remainder implemented by 2007. Due to the significant commitment by the power industry to SCR technology, EPRI sponsored development of operatio...

2003-11-17T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

SOLERAS - Solar-Powered Water Desalination Project at Yanbu: Forecasting models for operating and maintenance cost of the pilot plant  

Science Conference Proceedings (OSTI)

This study was conducted in cooperation with the Department of Industrial Engineering of King Abdulaziz University. The main objective of this study is to meet some of the goals of the Solar Energy Water Desalination Plant (SEWDP) plan in the area of economic evaluation. The first part of this project focused on describing the existing trend in the operation and maintenance (OandM) cost for the SOLERAS Solar Energy Water Desalination Plant in Yanbu. The second part used the information obtained on existing trends to find suitable forecasting models. These models, which are found here, are sensitive to changes in costs trends. Nevertheless, the study presented here has established the foundation for (OandM) costs estimating in the plant. The methodologies used in this study should continue as more data on operation and maintenance costs become available, because, in the long run, the trend in costs will help determine where cost effectiveness might be improved. 7 refs., 24 figs., 15 tabs.

Al-Idrisi, M.; Hamad, G.

1987-04-01T23:59:59.000Z

202

EPRI High-Voltage Direct Current (HVDC) Reference Book: Chapter 24 - Operation and Maintenance of HVDC Systems  

Science Conference Proceedings (OSTI)

This report contains descriptions of the operation and maintenance (O&M) activities of traditional high-voltage direct current (HVDC) line commutated (thyristor-based) and voltage-sourced converter (VSC) transmission systems. Both long-distance transmission schemesincluding the transmission linesand back-to-back schemes are included. The various tasks involved in the O&M of HVDC systems are described at some length, and a range of estimates is given for the staff requirements to carry out these activitie...

2010-01-19T23:59:59.000Z

203

Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1988 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1988.

Lofy, Peter T.

1989-12-01T23:59:59.000Z

204

Operation, Maintenance, and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1987 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1987.

Lofy, Peter T.

1988-12-01T23:59:59.000Z

205

Fermi Large Area Telescope Operations: Progress Over 4 Years  

SciTech Connect

The Fermi Gamma-ray Space Telescope was launched into orbit in June 2008, and is conducting a multi-year gamma-ray all-sky survey, using the main instrument on Fermi, the Large Area Telescope (LAT). Fermi began its science mission in August 2008, and has now been operating for almost 4 years. The SLAC National Accelerator Laboratory hosts the LAT Instrument Science Operations Center (ISOC), which supports the operation of the LAT in conjunction with the Mission Operations Center (MOC) and the Fermi Science Support Center (FSSC), both at NASA's Goddard Space Flight Center. The LAT has a continuous output data rate of about 1.5 Mbits per second, and data from the LAT are stored on Fermi and transmitted to the ground through TDRS and the MOC to the ISOC about 10 times per day. Several hundred computers at SLAC are used to process LAT data to perform event reconstruction, and gamma-ray photon data are subsequently delivered to the FSSC for public release with a few hours of being detected by the LAT. We summarize the current status of the LAT, and the evolution of the data processing and monitoring performed by the ISOC during the first 4 years of the Fermi mission, together with future plans for further changes to detected event data processing and instrument operations and monitoring.

Cameron, Robert A.; /SLAC

2012-06-28T23:59:59.000Z

206

Potential Operation and Maintenance (O&M) Savings in the John Sealy North Building at UTMB  

E-Print Network (OSTI)

The LoanSTAR Monitoring and Analysis Group, Energy Systems Laboratory at Texas A&M University, was requested by University of Texas Medical Branch at Galveston to investigate O&M measures in their five LoanSTAR program buildings. This report describes the suggested O&Ms in John Sealy North Building, a surgical building of 54,494 ft2,which currently spends $502,100 per year on electricity, steam and chilled water. The suggested O&Ms include optimizing the outside air treatment cold deck reset schedule, the cold deck reset schedule and the hot deck reset schedule. These optimized HVAC operation schedules were determined using an analysis involving a simplified HVAC model, which was calibrated against daily data measured by the LoanSTAR program. It is estimated that annual savings of $67,000, or 13% of the annual costs, can be realized using the optimized operation schedules which can be implemented without additional costs. Our analysis indicates that the room comfort levels will not be degraded by these measures.

Liu, M.; Athar, A.; Reddy, T. A.; Claridge, D. E.; Haberl, J. S.

1993-01-01T23:59:59.000Z

207

The Defense Waste Processing Facility: Two Years of Radioactive Operation  

Science Conference Proceedings (OSTI)

The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

Marra, S.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Gee, J.T.; Sproull, J.F.

1998-05-01T23:59:59.000Z

208

Texas AgriLife Extension Service Procedure 21.01.08.X1.05 Farm Equipment Operation and Maintenance Page 1 of 1  

E-Print Network (OSTI)

records for all equipment serviced in the Laserfiche Document Management System in section 5Texas AgriLife Extension Service Procedure 21.01.08.X1.05 Farm Equipment Operation and Maintenance AND MAINTENANCE Approved: July 21, 2001 Revised: December 14, 2010 Next Scheduled review: December 14, 2012

209

State of the art and emerging trends in operations and maintenance of offshore oil and gas production facilities: Some experiences and observations  

Science Conference Proceedings (OSTI)

Plant maintenance has been a discipline that has gradually evolved with the industrial revolution. For quite some time, it has been a "necessary evil" in production, manufacturing, and process settings. The changing business needs and industrial conditions ... Keywords: Maintenance, asset management, oil and gas operations, risk, technical integrity

Jayantha P. Liyanage

2010-05-01T23:59:59.000Z

210

Coal operators prepare for a prosperous new year  

Science Conference Proceedings (OSTI)

Results are given of the Coal Age 2008 annual Forecast Survey of 17 coal mining executives which reinforces that 2008 could be a very good year. Coal operators are planning to invest in new equipment, development and new coal mine start-ups, based on a number of demand- and supply-side fundamentals. 71% of those surveyed thought coal production in 2008 would increase from 2007 levels and US exports are expected to climb due to the weak dollar. If the tax credit on synfuels expires on 31 December 2007 production of coal synfuel will likely cease. Asked about expensive planned purchases, companies answers ranged from $80,000 for an underground scoop to $500 m for a new mine installation. However, most producers admit they will not be able to operate at full capacity. 7 figs.

Fiscor, S.

2008-01-15T23:59:59.000Z

211

Improving information flow for molding maintenance operations in a medical device manufacturing facility  

E-Print Network (OSTI)

Manufacturing companies seek ways to eliminate waste from their operations to stay competitive. In this project, the waste is in the mold repair process which involves two main groups, Molding and Tooling. By using process ...

Lin, YongLiang Manfred

2009-01-01T23:59:59.000Z

212

Potential Operation and Maintenance (O&M) Savings in the Basic Science Building at UTMB  

E-Print Network (OSTI)

This report presents the results of a study of the potential energy savings due to optimizing the Heating, Ventilation and Air Conditioning (HVAC) operation schedule in the Basic Science Building at University of Texas Medical Branch (UTMB), Galveston, Texas.

Liu, M.; Athar, A.; Claridge, D. E.; Reddy, T. A.; Haberl, J. S.

1993-01-01T23:59:59.000Z

213

Potential Operation and Maintenance (O&M) Savings in the Clinical Science Building at UTMB  

E-Print Network (OSTI)

This report presents the results of a study of the potential energy savings due to optimizing the Heating, Ventilation and Air Conditioning (HVAC) operation schedule in the Clinical Science Building at University of Texas Medical Brach (UTMB) Galveston, Texas.

Liu, M.; Athar, A.; Claridge, D. E.; Reddy, T. A.; Haberl, J. S.

1993-01-01T23:59:59.000Z

214

Descriptions of Past Research in Program 79: Combustion Turbine and Combined-Cycle Operations and Maintenance  

Science Conference Proceedings (OSTI)

The asset value of natural-gas-fired combustion turbines, especially in combined cycle plants, is on the rise, driven by their inherent efficiency, emissions, operational characteristics, broader market fit with a forecast affordable fuel supply, and complementary role covering load swings such as those from intermittent renewables. Cycling and high-temperature operations adversely affect combustion turbine life, as well as plant reliability and availability. The risks associated with hot section durabil...

2011-06-30T23:59:59.000Z

215

Ice Bear Energy Storage Demonstration at Hawaii Department of Education Operations and Maintenance  

Science Conference Proceedings (OSTI)

Energy storage strategies can play a major role in helping a utilities use their existing assets to meet projected loads. This project demonstrated the operational effectiveness and technical feasibility of the Ice Bear Ice Storage Air Conditioner for use with Direct-Expansion (DX) air-conditioners as an appropriate technology for demand reduction and peak load management in Hawaii.

2007-06-05T23:59:59.000Z

216

Integrated Chiller System Reduce Building Operation and Maintenance Costs in Cold Climates  

E-Print Network (OSTI)

Although water-cooled chillers are more energy efficient than air-cooled chillers, a majority of chilled water systems use air-cooled chillers. In cold weather climates, air-cooled chillers are capable of functioning in low ambient temperatures with few operational concerns, where as water-cooled chiller systems must be equipped to prevent cooling tower freezing. The integrated chiller system attempts to take advantage of each chiller's strengths and eliminate any cold weather operational concerns. An integrated chiller system includes a cooling tower and air-cooled condenser. During the summer, both the cooling tower and air condenser can be operated. In cold weather, the cooling tower is drained and the air condenser is used to dissipate the heat of the cooling system. The integrated chiller system eliminates the water storage tank and frequent charging and discharging of the cooling tower system. It reduces the size of the mechanical room and simplifies the operation of the system. The integrated chiller system is most suitable in climates where the mechanical cooling is required on a short-term basis during cold weather periods. This paper presents the system configuration, system design, optimal control, and energy impact. An example is used to demonstrate the design concepts of the integrated chiller systems.

Sheets, N.; Liu, M.

2003-01-01T23:59:59.000Z

217

Operation and maintenance manual for the optical alignment system (OAS) system 6250  

SciTech Connect

The OAS is a camera and laser system that will be used as an end effector on the LDUA to properly align the arm with the entry riser. It is attached to the LDUA by means of a Tool Interface Plat (TIP) which provides a feed through for all electrical and pneumatic utilities needed by the end effector to operate.

Pardini, A.F., Westinghouse Hanford

1996-07-16T23:59:59.000Z

218

United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

Not Available

1994-06-01T23:59:59.000Z

219

SP-100 operational life model. Fiscal Year 1990 annual report  

DOE Green Energy (OSTI)

This report covers the initial year`s effort in the development of an Operational Life Model (OLM) for the SP-100 Space Reactor Power System. The initial step undertaken in developing the OLM was to review all available documentation from GE on their plans for the OLM and on the degradation and failure mechanisms envisioned for the SP-100. In addition, the DEGRA code developed at JPL, which modelled the degradation of the General Purpose Heat Source based Radioisotope Thermoelectric Generator (GPHS-RTG), was reviewed. Based on the review of the degradation and failure mechanisms, a list of the most pertinent degradation effects along with their key degradation mechanisms was compiled. This was done as a way of separating the mechanisms from the effects and allowing all of the effects to be incorporated into the OLM. The emphasis was on parameters which will tend to change performance as a function of time and not on those that are simply failures without any prior degradation.

Ewell, R.; Awaya, H.

1990-12-14T23:59:59.000Z

220

Geothermal Heat Pump Systems in Schools: Construction, Maintenance and Operating Costs  

Science Conference Proceedings (OSTI)

Geothermal heat pumping and cooling systems are still not widely used to heat and cool buildings. They are an unknown to most architects and engineers. The electric utility industry has recognized them as being a very energy-efficient way to heat and cool buildings using electricity. The Tennessee Valley Authority (TVA) has assisted in design and installation of many geothermal systems, particularly in school buildings. With a number of geothermal heat pump systems in schools in operation in the TVA regi...

2000-12-13T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Operation and maintenance manual for the high resolution stereoscopic video camera system (HRSVS) system 6230  

SciTech Connect

The High Resolution Stereoscopic Video Cameral System (HRSVS),system 6230, is a stereoscopic camera system that will be used as an end effector on the LDUA to perform surveillance and inspection activities within Hanford waste tanks. It is attached to the LDUA by means of a Tool Interface Plate (TIP), which provides a feed through for all electrical and pneumatic utilities needed by the end effector to operate.

Pardini, A.F., Westinghouse Hanford

1996-07-16T23:59:59.000Z

222

Potential Operation and Maintenance (O&M) Savings in the John Sealy South Building at UTMB  

E-Print Network (OSTI)

The LoanSTAR Monitoring and Analysis Group was requested by UTMB to investigate O&M measures in their five LoanSTAR program buildings. This report describes the suggested O&M measures in John Sealy South Building, an out-patient building of 373,000 ft2, currently costs $990,000 per year on electricity, steam and chilled water.

Liu, M.; Athar, A.; Reddy, T. A.; Houcek, J. K.; Claridge, D. E.; Haberl, J. S.

1993-01-01T23:59:59.000Z

223

Feedwater Heater Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of feedwater heaters. The contents of this guide will assist plant personnel in improving feedwater heater reliability, performance, and maintenance practices.

2002-05-29T23:59:59.000Z

224

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

DOE Green Energy (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

225

Four years of operations and results with FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

Klingner, P. L. (Phillip L.); Carlson, L. D. (Leslie D.); Dingler, R. D. (Robert D.); Esch-Mosher, D. M. (Diana M.); Jacobson, A. R.; Roussel-Dupre, D. (Diane)

2001-01-01T23:59:59.000Z

226

FOUR YEARS OF OPERATIONS AND RESULTS WITH FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

D. ROUSSEL-DUPRE; P. KLINGNER; L. CARLSON; ET AL

2001-06-01T23:59:59.000Z

227

Condenser Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Application and Maintenance Guide provides plant personnel with information on the operation, maintenance, and performance of condensers. The contents of this guide will assist plants in improving condenser performance, reducing maintenance costs, and increasing condenser reliability.

2001-08-23T23:59:59.000Z

228

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

229

Installation, Operation & Maintenance Instructions  

Science Conference Proceedings (OSTI)

... Connection by line plug: the plug should be within reach of the ... 1-phase L Brown To live to either power conductor ... Wash work clothing separately. ...

2013-11-29T23:59:59.000Z

230

Operation and Maintenance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and cost-effective is the first step to obtaining energy-efficient building performance. An O&M assessment provides a systematic look at all aspects of the current O&M...

231

Operation and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

a shortage or pricing becomes erratic. Forecasted Energy Prices Forecasted Energy Prices (xls) SLCAIP Generation Forecast Table (pdf) Historical data Powerplant data...

232

Facilitating Decision Making and Maintenance for Power Systems Operators through the Use of Agents and Distributed Embedded Systems  

Science Conference Proceedings (OSTI)

This article examines the improvements provided when multimedia information in traditional SCADAS are included in electric facility management and maintenance. Telecontrol use in the electric sector, with the fundamental objective of providing increased ... Keywords: Embedded Systems, Maintenance, Multi-Agent Systems, SCADA, Surveillance, Telecontrol

A. Carrasco; M. C. Romero-Ternero; F. Sivianes; M. D. Hernández; D. I. Oviedo; J. Escudero

2010-10-01T23:59:59.000Z

233

Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners  

Science Conference Proceedings (OSTI)

This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

2007-05-25T23:59:59.000Z

234

Data Base Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Maintenance Keys Page anyone in Site Operations Building Management (see Personnel) with your room number. If you are locked out during off-hours, contact Security on...

235

High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance  

DOE Green Energy (OSTI)

This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly total than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.

Wilson, L.E.; McGuire, D.R.

1984-05-01T23:59:59.000Z

236

Texas AgriLife Research Procedure 21.01.08.A1.05 Farm Equipment Operation and Maintenance Page 1 of 1 Texas AgriLife Research Procedures  

E-Print Network (OSTI)

for all equipment serviced in the Laserfiche Document Management System in section 5.6.1 by the equipmentTexas AgriLife Research Procedure 21.01.08.A1.05 Farm Equipment Operation and Maintenance Page 1 of 1 Texas AgriLife Research Procedures 21.01.08.A1.05 FARM EQUIPMENT OPERATION AND MAINTENANCE

237

Offshore software maintenance methodology  

Science Conference Proceedings (OSTI)

Keywords: maintenance methodology, offshore maintenance, remote maintenance, software economics, software maintenance

M. Pavan Kumar; V. Sita Rama Das; N. Netaji

1996-05-01T23:59:59.000Z

238

APS Long-Range Operations Schedule (Fiscal Year 2014)  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule (Fiscal Year 2014) Schedule (Fiscal Year 2014) Run 2013-3 Run 2014-1 Run 2014-2 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 2 2 2 2 1 1 1 2 2 2 2 1 1 1 2 2 3 3 1 1 1 3 3 3 3 1 1 1 3 3 3 3 1 1 1 3 3 4 4 1 1 1 4 4 4 4 4 4 1 4 4 4 4 1 4 4 5 5 1 5 4 4 4 5 5 5 1 1 5 5 5 5 5 5 6 6 1 1 6 4 4 4 6 6 6 1 1 1 6 6 6 6 6 6 7 7 1 1 1 7 4 4 4 7 7 7 1 1 1 7 7 7 7 7 7 8 8 1 1 1 8 4 4 4 8 8 8 1 1 1 8 8 8 8 1 1 8 8 9 9 1 1 1 9 4 4 4 9 9 9 1 1 1 9 9 9 9 1 1 1 9 9 10 10 1 1 1 10 4 10 10 10 1 1 1 10 10 10 10 1 1 1 10 10 11 11 1 11 4 4 11 11 11 1 11 11 11 11 1 1 1 11 11 12 12 12 4 4 4 12 12 12 4 4 12 12 12 12 1 1 1 12 12 13 13 13 4 4 4 13 13 13 4 4 4 13 13 13 13 1 1

239

Direct use of low temperature geothermal water by Aquafarms International, Inc. for freshwater aquaculture (prawns and associated species). An operations and maintenance manual  

DOE Green Energy (OSTI)

In connection with an ongoing commercial aquaculture project in the Coachella Valley, California; a twelve month prawn growout demonstration project was conducted. This project began in August, 1979 and involved the use of low temperature (85/sup 0/F) geothermal waters to raise freshwater prawns, Macrobrachium rosenbergii (deMan), in earthen ponds. The following publication is an operations and maintenance guide which may by useful for those interested in conducting similar enterprises.

Broughton, R.; Price, M.; Price, V.; Grajcer, D.

1984-04-01T23:59:59.000Z

240

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2010 Operational Plan FY2010 Operational Plan - Goal 1 Summary FY2010 Operational Plan - Goal 2 Summary FY2010 Operational Plan - Goal 3 Summary

242

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

243

Paste Plant Operations  

Science Conference Proceedings (OSTI)

Mar 5, 2013 ... It now provides data extraction features that aggregate system ... DUBAL Carbon Plant management team defined and implemented a 3-year strategic ... how to best approach Paste Plant operating and maintenance activities.

244

Equipment Maintenance Optimization Manual Prototypes  

Science Conference Proceedings (OSTI)

This report provides detailed information to assist plant staff in performing recommended equipment maintenance tasks. It is a compilation of equipment maintenance optimization manual (EMOM) prototypes that include procedures and trouble shooting supported by broad-based utility experience. The EMOMs enable utility generation stations to: minimize operation and maintenance costs, including parts and labor; assist in maintenance planning, scheduling, and parts strategy; develop comprehensive maintenance m...

1999-11-24T23:59:59.000Z

245

Nuclear Maintenance Applications Center: Heat Exchanger Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of heat exchangers. The contents of this guide will assist plant personnel in improving heat exchanger reliability, performance, and maintenance practices.

2009-06-14T23:59:59.000Z

246

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

247

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

248

Federal Energy Management Program: Reactive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

249

Federal Energy Management Program: Preventive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

250

Nuclear Maintenance Applications Center: Application Guide for Motor-Operated Valves in Nuclear Power Plants - Revision 2  

Science Conference Proceedings (OSTI)

Motor-operated gate and globe valves are widely used in both safety-related and non-safety-related systems in nuclear power plants. Their proper operation is essential for reliable plant performance and can help eliminate costly downtime. This second revision of the Application Guide for Motor-Operated Valves provides the latest in methods for conducting engineering evaluations in order to confirm that motor-operated gate, globe, and butterfly valves will perform their required function and offers sugges...

2007-08-22T23:59:59.000Z

251

Wind Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

This guideline provides component-level information regarding the maintenance of major components associated with a wind turbine. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of wind turbine facilities.

2012-06-29T23:59:59.000Z

252

DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exercises 5 Year Option on Washington TRU Solutions Contract to Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 - 9:55am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) announced today that it has decided to exercise the five year option in the Washington TRU Solutions LLC ("WTS") contract to continue managing and operating the Department's Waste Isolation Pilot Plant (WIPP), located in New Mexico. The option DOE exercised is a part of the WIPP contract that was competitively procured in 2000. The WTS contract will now run through September 30, 2010 with an estimated value over the five year timeframe of approximately $704 million. "We are very pleased to take this step," said Kyle McSlarrow, Deputy

253

University of Washington Clinical Neutron Facility: Report on 26 Years of Operation  

Science Conference Proceedings (OSTI)

Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi [Department of Radiation Oncology, Box 356043 University of Washington Medical Center Seattle, WA 98195-6043 (United States)

2011-12-13T23:59:59.000Z

254

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

255

Compressed Air System Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Compressed Air System Maintenance Guide" provides fossil plant personnel with information on the operation and maintenance of the compressed air system. The contents of this guide will assist personnel in improving performance of the compressed air system, reducing maintenance costs, and increasing air system reliability.

2002-11-27T23:59:59.000Z

256

RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3  

SciTech Connect

RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

Not Available

1993-12-01T23:59:59.000Z

257

Impact of Cycling on the Operation and Maintenance Cost of Conventional and Combined-Cycle Power Plants  

Science Conference Proceedings (OSTI)

The ongoing privatization of electricity generation across the world, competition and shareholder demand for higher profits, stricter regulations on environmental impacts, changes in fuel prices, and the increasing penetration of nondispatchable energy have resulted in an increasing need for larger energy generators to operate as non-baseload units. As a result, both conventional power plants and combined-cycle power plants are increasingly being subjected to load-following and cyclic operation. ...

2013-09-30T23:59:59.000Z

258

Carbon Storage Partner Completes First Year of CO2 Injection Operations in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storage Partner Completes First Year of CO2 Injection Storage Partner Completes First Year of CO2 Injection Operations in Illinois Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois November 19, 2012 - 12:00pm Addthis Washington, DC - A project important to demonstrating the commercial viability of carbon capture, utilization and storage (CCUS) technology has completed the first year of injecting carbon dioxide (CO2) from an industrial plant at a large-scale test site in Illinois. Led by the Illinois State Geological Survey, the Illinois Basin-Decatur Project is the first demonstration-scale project in the United States to use CO2 from an industrial source and inject it into a saline reservoir. The CO2 is being captured from an ethanol production facility operated by the Archer Daniels Midland Company in Decatur, Ill., and is being injected

259

Federal Energy Management Program: Predictive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

260

Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater  

SciTech Connect

This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

Forsythe, Howard S.

2010-04-10T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

262

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

263

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

264

Prison Industries Metering at the Texas Department of Criminal Justice: Two Years of Operational Experience  

E-Print Network (OSTI)

In 2001 the Texas Department of Criminal Justice Utilities and Energy Department (TDCJU& E) completed the installation of an extensive energy consumption metering system for their prison industries system. As the second largest state prison system in the nation, TDCJ facilities are scattered over many locations around the state and cover a diversity of prison industries and agricultural operations. The Energy Systems Laboratory (ESL), with New Horizon Technologies, Inc. (NHT) and eComponents Technology, Inc. installed a state-ofthe- art sub-metering system with the intent of meeting the needs of the TDCJ-U&E group well into the future. The system uses a web-based data acquisition interface and is capable of near real-time data acquisition and display. Fifteen-minute interval utility and sub-metered energy consumption data have been continuously collected since the system was commissioned. This paper describes the varied applications for these data at the TDCJ-U&E department. Significant improvements in the quality of energy use reporting and unit accountability have been obtained. Prison industries now receive monthly energy consumption reports and are responsible for the cost of their sub-metered energy consumption. Additionally, the operations and maintenance staff have found the data to be very useful for energy systems and equipment operational diagnosis.

Bryant, J.; McBride, J.; Merka, T.

2003-01-01T23:59:59.000Z

265

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

266

Solar water-heating system for the Ingham County geriatric medical care facility, Okemos, Michigan. Operational and maintenance instruction manual  

DOE Green Energy (OSTI)

The objectives of the Ingham County Solar Project include: the demonstration of a major operational supplement to fossil fuels, thereby reducing the demand for non-renewable energy sources, demonstration of the economic and technical feasibility of solar systems as an important energy supplement over the expected life of the building, and to encourage Michigan industry to produce and incorporate solar systems in their own facility. The Ingham County solar system consists of approximately 10,000 square feet of solar collectors connected in a closed configuration loop. The primary loop solution is a mixture of water and propylene glycol which flows through the tube side of a heat exchanger connected to the primary storage tank. The heat energy which is supplied to the primary storage tank is subsequently utilized to increase the temperature of the laundry water, kitchen water, and domestic potable water.

Not Available

1983-07-29T23:59:59.000Z

267

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

268

Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996  

SciTech Connect

During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

1996-12-31T23:59:59.000Z

269

Energy savings from operation and maintenance training for apartment boiler heating systems. An energy study on ten low-income apartments  

SciTech Connect

The Portland Energy Office provided operation and maintenance (O&M) training to the operators of boiler heating systems for ten low-income apartment complexes in the Fall of 1990. This study tracked energy usage before and after O&M training to see if savings occurred. Training was provided on both weatherized and non-weatherized apartments to find out if weatherization impacted the amount of O&M savings to be obtained. Also, energy savings from the O&M training and building shell weatherization are compared. The O&M training averaged about four hours per building. Content was adjusted at each site to match needs of the boiler and operator. The Energy Office also provided a boiler tune-up by a service technician. The training stressed low-cost and no-cost measures which operators could either do themselves or hire service help to implement. It also emphasized boiler safety. Nine of the ten apartment complexes in the study used less energy per heating degree-day after the O&M help. Average savings were 10%. Four apartments chosen randomly as controls had negative savings; they used slightly more energy during the same post-O&M time frame. Weatherized and unweatherized apartments showed similar savings after the O&M help, 10% and 11% percent respectively. Savings from weatherization of six of the apartments in the winter of 1988--1989 were also measured. A low average of only 4% was observed, reflecting negative savings in two buildings.

1992-02-01T23:59:59.000Z

270

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992  

SciTech Connect

During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

1992-12-31T23:59:59.000Z

271

NETL: News Release - Solid Oxide Fuel Cell Reaches One Year of Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2000 January 31, 2000 Solid Oxide Fuel Cell Reaches One Year of Operations Netherlands Test Boosts Confidence for Commercial Introduction by 2004 An experimental all solid-state fuel cell - the possible prototype for a future "combustion-less" power plant - has passed a key milestone in a joint public-private development effort. Schematic Diagram of Tubular Solid Oxide Fuel Cell The Siemens Westinghouse solid oxide fuel cell is a tubular arrangement of concentric ceramic electrodes and a solid-state electrolyte. Siemens-Westinghouse Power Corp., headquartered in Orlando, FL, announced this week that its 100-kilowatt solid oxide fuel cell power system, the world's largest, has completed one year of total operating time, the longest any fuel cell of this type and size has run. The milestone marked

272

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-06-01T23:59:59.000Z

273

DOE KSU EV Site Operator Program. Year 1, fourth quarter report, April 1--June 30, 1992  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter`s report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-08-01T23:59:59.000Z

274

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

275

Safety implications from 20 years of operating experience at EBR-II  

Science Conference Proceedings (OSTI)

EBR-II recently passed a major milestone in its operating history, 20 years of operation on August 13, 1984. The plant has gone through three major program phases during this time and is now entering a fourth. Those are: (1) demonstration of the feasibility of a complete LMFBR power plant, including on-site reprocessing of metal fuel, (2) irradiation testing of fuels and materials to support core and fuel design for CRBR and FFTF, (3) operational-safety testing to establish and demonstrate the inherent safety of LMFBRs and now, (4) the integration of this technology into demonstration of the integral fast reactor (IFR) concept. As EBR-II has progressed through these phases, much has been learned that is relevant to fast-reactor safety.

Sackett, J.I.; Buschman, H.W.

1985-01-01T23:59:59.000Z

276

Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne  

Science Conference Proceedings (OSTI)

OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

None

2000-09-01T23:59:59.000Z

277

Preventive Maintenance Programs  

Science Conference Proceedings (OSTI)

...and specifications Operator, service, and repair manuals Lubricant type Filter specifications Wear components, especially material survey data Prior service and maintenance reports to identify problem Establish sampling and sample handling procedures Design and document sampling methods, such as in-live...

278

Nuclear Maintenance Applications Center: Emergency Diesel Generator Condition- Based Maintenance  

Science Conference Proceedings (OSTI)

Condition-based maintenance practices that were developed in the United States in the 1990s for emergency diesel generators (EDGs) have not been fully adopted by international nuclear plant operators. To encourage broader use of such practices, NMAC formed a technical advisory group of international utilities interested in learning more about condition-based EDG maintenance practices.

2008-12-19T23:59:59.000Z

279

Attention to maintenance is key to longer battery life  

SciTech Connect

A unique way for battery maintenance on electric truck is described. This system is involved in multi-shift operation entailing battery changing, charging, and programed maintenance.

1975-08-01T23:59:59.000Z

280

Achieving world class maintenance status  

Science Conference Proceedings (OSTI)

The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

2007-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Predictive Maintenance Program: Development and Implementation  

Science Conference Proceedings (OSTI)

Many forces -- the economy, competition, regulatory agencies -- are pressuring utilities to reduce operating and maintenance (O&M) costs without cutting back on reliability or availability. Many utility managers are re-evaluating their maintenance strategies to meet these demands. To show utilities how to reduce maintenance costs and extend the effective operating life of equipment, EPRI has organized an annual workshop around a unique management approach -- Predictive Maintenance (PDM).

1999-06-25T23:59:59.000Z

282

FINAL REPORT: PHASE FOUR HIGHWAY MAINTENANCE CONCEPT VEHICLE  

E-Print Network (OSTI)

the maintenance management system. Phase IV has two major strands, technical and financial. The outcome of Phase ................................................................................................................. 55 AMS-200 (Application Management System) Console innovation in highway maintenance management, maintenance operations practices, and research. CTRE provided

Beresnev, Igor

283

Management Applications of Maintenance Reports  

E-Print Network (OSTI)

The good computerized maintenance management systems available today provide Plant Engineers with sufficient data to institute policies and procedures to materially affect the company profits. Regrettably, the vast majority of these Engineers and their Maintenance Managers seem content to simply produce PM work orders, maintenance equipment repair histories and generate a few activity reports. A straightforward and practical application of the available cost and performance data enables maintenance management to constantly fine tune operational procedures to minimize cost and equipment failure from the available data. Using this data, the manager can easily measure the total effect of maintenance on his company's overall performance. The practical application of this data to reduce overall maintenance cost and to increase equipment availability is discussed in this paper.

Gehl, P.

1993-03-01T23:59:59.000Z

284

Development of an Operations and Maintenance Cost Model to Identify Cost of Energy Savings for Low Wind Speed Turbines: July 2, 2004 -- June 30, 2008  

SciTech Connect

The report describes the operatons and maintenance cost model developed by Global Energy Concepts under contract to NREL to estimate the O&M costs for commercial wind turbine generator facilities.

Poore, R.

2008-01-01T23:59:59.000Z

285

Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational  

SciTech Connect

This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

NONE

1995-05-01T23:59:59.000Z

286

Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power  

SciTech Connect

This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

Rutherford, P.D. [ed.] [ed.

1999-09-22T23:59:59.000Z

287

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

288

SUMMARY OF REACTOR DESIGN INFORMATION FROM THREE YEARS' OPERATION OF A SMALL PWR  

SciTech Connect

Reactor design information obtained from 3 years' operation of a small pressurized-water reactor, the SM-1 (formerly APPR-l), is presented and discussed. The SM-1 reactor, designed to produce 10 Mw(t) power, employs fully enriched uranium fuel in the form of UO/sub 2/ dispersed in stainless-steel fuel plates. The reactor is cooled by water at 1200 psia and mean temperature of 44) deg F. Core-physics measurements were performed of temperature coefficient, pressure coefficient, rod calibration, stuck rod position, and transient xenon as a function of core burn-out. Core burn-out characteristics were compared with few- group calculations, and reasonable agreement was obtained. Thermal-heat-balance data were obtained on the reactor core. The temperature pattern in the nominal and hot channels under operating conditions was calculated. These calculations indicated that certain of the fuel channels operated in the nucleate boiling regime. Examination of one of the fuel channels suspected of nucleate boiling indicated no adverse effects. The system response to load perturbations and during pump coast-down was measured utilizing plant instrumentation. This response was compared with analytical predictions using a lumped kinetic model, and reasonable agreement was found. Both neutron and gamma traverses were made through the primary shield during reactor operation. Gamma traverses were also made through the primary shield as a function of time after reactor shutdown. Conventional shielding calculational methods are found to give agreement with experiment sufficient for design purposes. An absolute ionization chamber was employed to measure N/sup 16/ activity in the reactor coolant. These measurements were compared with N/sup 16/ calculated from the (n,p) reaction on O/ sup 16/. (auth)

Gallagher, J.G.

1960-09-01T23:59:59.000Z

289

Computerized asset management and maintenance systems in ST  

E-Print Network (OSTI)

The ST division manages and therefore maintains the CERN technical installations. A maintenance database application exists for every technical domain. A total of six different databases were built during the last 10 years and are based on the RAPIER maintenance program. As the Computerized Asset Management and Maintenance Systems (CAMMS) technology has evolved, the RAPIER system has become obsolete. Therefore we are forced to migrate to its latest version, MP5, before the year 2000. The migration path must be defined, leading from the current situation to a fully operational MP5 application. The major elements of each migration path consist in determining the functionality to use, defining the operation of it, adapting and/or creating procedures, converting data and providing training. A migration is always a process of change. The migration presents a unique opportunity to evaluate the current implementations, adapt them to the requirements and exploit the new features offered. Obsolete data and inconsisten...

Sánchez-Corral, E

1999-01-01T23:59:59.000Z

290

Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995  

SciTech Connect

This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.W., Westinghouse Hanford

1996-07-30T23:59:59.000Z

291

Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994  

SciTech Connect

This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

1995-08-01T23:59:59.000Z

292

DOE/KEURP site operator program. Year 3, Second Quarter Report, October 1--December 31, 1993  

Science Conference Proceedings (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU has purchased several electric cars and proposes to purchase additional electric vehicles. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has procured two (2) Soleq 1993 Ford EVcort station wagons. During calendar year 1994, the Kansas` electric vehicle program expects to purchase a minimum of four and a maximum of eleven additional electric vehicles. The G-Van was signed in order for the public to be aware that it was an electric vehicle. Financial participants` names have been stenciled on the back door of the van. The Soleq EvCorts have not been signed. In order to demonstrate the technology as feasible, the EvCorts were deliberately not signed. The goal is to generate a public perception that this vehicle is no different from any similar internal combustion engine vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged.

Not Available

1993-12-31T23:59:59.000Z

293

Electrohydraulic Control (EHC) Fluid Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Electrohydraulic Control (EHC) Fluid Maintenance Guide" provides plant personnel with information on the operation, maintenance, and performance of the electrohydraulic control (EHC) system. The contents of this guide will aid plant workers in improving EHC system reliability, performance, and plant maintenance practices.

2002-12-29T23:59:59.000Z

294

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

295

Pacific Northwest National Laboratory Grounds Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The...

296

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

297

Subj: Educational and General (E&G) Facility Support Provide an overview of Facility Operations, Maintenance, Repair and Renovation and Space  

E-Print Network (OSTI)

and infrastructure. Facilities Energy & Utilities: Energy and Utilities is responsible for campus-wide utility and maintain this system and its components. Deferred Maintenance: Given the age of buildings and the wear buildings and infrastructure in working order. Minor and Major Repairs: Generally, minor repairs include

Pohl, Karsten

298

Results of the first year of operation at Embalse Nuclear Power Station in Argentina  

SciTech Connect

As a part of the International Remote Monitoring Project, during March 1995, a Remote Monitoring System (RMS) was installed at the Embalse Nuclear Power Station in Embalse, Argentina. This system monitors the status of four typical Candu spent fuel dry storage silos. The monitoring equipment for each silo consists of analog sensors for temperature and gamma radiation measurement; digital sensors for motion detection; and electronic fiber-optic seals. The monitoring system for each silo is connected to a wireless Authenticate Item Monitoring System (AIMS). This paper describes the operation of the RMS during the first year of the trial and presents the results of the signals reported by the system compared with the on site inspections conducted by the regulatory bodies, ABACC, IAEA, ENREN. As an additional security feature, each sensor periodically transmits authenticated State-of-Health (SOH) messages. This feature provides assurance that all sensors are operational and have not been tampered with. The details of the transmitted information and the incidents of loss of SOH, referred to as Missing SOH Event, and the possible causes which produced the MSOHE are described. The RMS at the embalse facility uses gamma radiation detectors in a strong radiation field of spent fuel dry storage silos. The detectors are Geiger Muller tubes and Silicon solid state diodes. The study of the thermal drift of electronics in GM detectors and the possible radiation damage in silicon detectors is shown. Since the initial installation, the system has been successfully interrogated from Buenos Aires and Albuquerque. The experience gained, and the small changes made in the hardware in order to improve the performance of the system is presented.

Bonino, A.; Pizarro, L.; Higa, Z. [Ente Nacional Regulador Nuclear, Buenos Aires (Argentina); Dupree, S.A.; Schoeneman, J.L. [Sandia National Labs., Albuquerque, NM (United States)

1996-07-16T23:59:59.000Z

299

YEAR  

National Nuclear Security Administration (NNSA)

Male 2 Asian Female 1 Hispanic Male 3 Hispanic Female 6 White Male 50 White Female 11 DIVERSITY GENDER Workforce Diversity Associate Administrator for Emergency Operations (NA-40)...

300

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

L. O. Nelson

2003-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Nuclear Maintenance Applications Center: Crane Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

This report is an update to the original guideline, published in December 2000 as Electric Power Research Institute (EPRI) report 1000986, and supersedes it in its entirety. This updated guide provides technical, maintenance, operational, training, inspection, and troubleshooting information for overhead bridge cranes used in nuclear power plants. Individual utilities can use this guide as a reference document that provides detailed component information, in-depth overhead bridge crane maintenance practi...

2011-03-07T23:59:59.000Z

302

Utilities are doing too much breaker maintenance  

Science Conference Proceedings (OSTI)

Many breaker failures occur after the breaker has been torn down for maintenance because some error was made in reassembling it. Utilities now can get a better understanding of circuit breaker reliability as the result of a worldwide survey conducted by the International Conference on Large High-Voltage Electric Systems (Cigre) of the reliability of circuit breakers 63 kV and above. The most significant finding is that the rate of major failures have dropped drastically with the introduction of modern SF[sub 6] breakers (from 1.58 to 0.67 per 100 breaker-years). But the rate of minor failures - such as gas leaks, which require maintenance and add to the operating cost - has increased by 30%. Incorrect maintenance causes far fewer failures in modern breakers, simply because they have to be torn down less frequently. Only 15% as many major failures and 77% as many minor failures can be attributed to incorrect maintenance. The failure to open or close on command are still the dominant major-failure modes of circuit breakers. 4 tabs.

Heising, C. (Reliability Consultant, Wynnewood, PA (United States))

1994-12-01T23:59:59.000Z

303

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

304

Nuclear Maintenance Applications Center: Preventive Maintenance Program Guideline  

Science Conference Proceedings (OSTI)

Over the years, the Electric Power Research Institute (EPRI) has developed many technical documents to aid in developing effective preventive, predictive, and condition monitoring maintenance programs to ensure equipment reliability and availability. The industry has drawn on this information to establish or enhance preventive maintenance (PM) programs. However, not all PM program processes have been implemented, leaving some programs marginally effective and vulnerable to failure. The purpose of this re...

2011-07-11T23:59:59.000Z

305

care and maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

306

Condition-Based Maintenance Guideline  

Science Conference Proceedings (OSTI)

Since the 1980s, EPRI has published various documents relating to predictive or condition-based maintenance (CBM) programs. These documents have served as a foundation for predictive maintenance programs within our industry. Many of these published documents are now more than 10 years old. As a result, EPRI is reviewing these documents to compare them with current practices and programs. EPRIs initial goal is to revise and update the guidance and create a principal core document on predictive and conditi...

2011-11-16T23:59:59.000Z

307

Long-Term Surveillance and Maintenance at the Rocky Flats Site: Lessons Learned Based on the First Years Real Experiences From the Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned - 8350 S. Surovchak U.S. Department of Energy, Office of Legacy Management 11025 Dover Street, Suite 1000, Westminster, CO 80021 L. Kaiser, R. DiSalvo, J. Boylan, G. Squibb, J. Nelson, B. Darr, M. Hanson S.M. Stoller Corporation 11025 Dover Street, Suite 1000, Westminster, CO 80021 ABSTRACT The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its

308

Pulverizer Maintenance Guide  

Science Conference Proceedings (OSTI)

The Pulverizer Maintenance Guide, Volume 3: Ball/Tube Mills provides fossil plant personnel with current maintenance information on ball/tube mills from different manufacturers. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2006-03-31T23:59:59.000Z

309

Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance  

Science Conference Proceedings (OSTI)

Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

R. Fink, D. Hill, J. O'Hara

2004-11-30T23:59:59.000Z

310

Microsoft Word - maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

311

Cylinder Surveillance and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance and Maintenance Cylinder Surveillance and Maintenance DOE has a Cylinder Management program in place to inspect and maintain depleted UF6 cylinders, and to improve...

312

Optimized Maintenance of Generator Rotors  

Science Conference Proceedings (OSTI)

Generator rotor maintenance options are limited and expensive. The timing and scope of work done requires optimization to obtain the maximum benefits for continued long-term trouble-free operation. This document is a comprehensive guide to the maintenance of large generator rotors of 2 and 4 pole design that are cooled directly or indirectly by air or hydrogen. These include 50 and 60 Hz machines, operating at speeds of 1500, 1800, 3000, and 3600 RPM. The guide does not cover water-cooled rotors. The inf...

2004-12-13T23:59:59.000Z

313

One-Year Operational Measurements with a Sonic Anemometer–Thermometer and a Doppler Sodar  

Science Conference Proceedings (OSTI)

A Doppler sodar and an ultrasonic anemometer–thermometer, which are operated continuously at a nuclear research center in Germany, are described. Mean values and second moments including turbulent surface fluxes recorded over 1 yr are analyzed in ...

Gerhard Peters; Bernd Fischer; Hans Jürgen Kirtzel

1998-02-01T23:59:59.000Z

314

Two Years of Operational Comprehensive Hydrostatic Quality Control at the National Meteorological Center  

Science Conference Proceedings (OSTI)

A comprehensive hydrostatic quality control (CHQC) procedure for rawinsonde heights and temperatures was implemented into operational use at the National Meteorological Center (NMC) in December 1988. The CHQC uses a sophisticated decision-making ...

Lev S. Gandin; Lauren L. Morone; William G. Collins

1993-03-01T23:59:59.000Z

315

Model Output Statistics Forecasts: Three Years of Operational Experience in the Netherlands  

Science Conference Proceedings (OSTI)

In the Netherlands, one to five day Model Output Statistics (MOS) forecasts have been used operationally since November 1983. The weather elements predicted are the probability of precipitation, the conditional probability of frozen precipitation,...

C. Lemcke; S. Kruizinga

1988-05-01T23:59:59.000Z

316

Site operator program final report for fiscal years 1992 through 1996  

DOE Green Energy (OSTI)

The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1998-01-01T23:59:59.000Z

317

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

318

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

319

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

320

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Federal Alternative Fuel Program Light Duty Vehicle Operations. Second annual report to Congress for fiscal year 1992  

DOE Green Energy (OSTI)

This annual report to Congress details the second year of the Federal light duty vehicle operations as required by Section 400AA(b)(1)(B) of the Energy Policy and Conservation Act as amended by the Alternative Motor Fuels Act of 1988, Public Law 100-494. In 1992, the Federal alternative fuel vehicle fleet expanded significantly, from the 65 M85 (85 percent methanol and 15 percent unleaded gasoline) vehicles acquired in 1991 to an anticipated total of 3,267 light duty vehicles. Operating data are being collected from slightly over 20 percent, or 666, of these vehicles. The 601 additional vehicles that were added to the data collection program in 1992 include 75 compressed natural gas Dodge full-size (8-passenger) vans, 25 E85 (85 percent denatured ethanol and 15 percent unleaded gasoline) Chevrolet Lumina sedans, 250 M85 Dodge Spirit sedans (planned to begin operation in fiscal year 1993), and 251 compressed natural gas Chevrolet C-20 pickup trucks. Figure ES-1 illustrates the locations where the Federal light duty alternative fuel vehicles that are participating in the data collection program are operating. The primary criteria for placement of vehicles will continue to include air quality attainment status and the availability of an alternative fuel infrastructure to support the vehicles. This report details the second year of the Federal light duty vehicle operations, from October 1991 through September 1992.

Not Available

1993-07-01T23:59:59.000Z

322

DOE/KEURP Site Operator Program. Year 2, Final report (fourth quarter), April--June 1993  

SciTech Connect

A second successful year has been completed of demonstrating and evaluating electric vehicle technology. The G-Van has begun to show signs of system failure (<10 miles/charge). The DSEP minivan remains idle. The Soleq vehicle performed well.

Hague, J.R.

1993-07-01T23:59:59.000Z

323

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

324

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993  

Science Conference Proceedings (OSTI)

During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program`s oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994.

Not Available

1993-12-31T23:59:59.000Z

325

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

326

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

327

DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

NONE

1995-12-01T23:59:59.000Z

328

Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification: Guidelines for Planning, Specifi cation, Design, Licensing, Implementation, Training, Operation, and Maintenance  

Science Conference Proceedings (OSTI)

Operators of nuclear power plants face a significant challenge designing and modifying control rooms that will be produced at various stages of instrumentation and control modernization. This report provides guidance on planning, specifying, designing, implementing, operating, maintaining, and training for modernized control rooms and digital human-system interfaces. Much of the guidance also will support new plant control rooms. This report also presents detailed information and guidelines on specific t...

2004-11-29T23:59:59.000Z

329

Computing Division two-year operational plan, FY 1981-1982  

Science Conference Proceedings (OSTI)

This report is a comprehensive planning guide for the Computing Division of the Los Alamos National Laboratory for fiscal years 1981 and 1982. Subjects discussed include critical issues, programmatic requiements, hardware plans, software projects, direct user services, research projects, and projections of future developments.

Euald, R.H.; Worlton, W.J.; McCormick, M.

1981-02-01T23:59:59.000Z

330

Ash Handling System Maintenance Guide  

Science Conference Proceedings (OSTI)

This Ash Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for the ash handling system.

2005-12-23T23:59:59.000Z

331

Power Supply Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Instrument power supplies are very reliable; however, there is limited information that ties together operating history, maintenance practices, and data associated with repairing versus replacing power supplies. Also, the issue of equipment obsolescence affects many of the considerations associated with making power supply maintenance decisions.

2001-12-21T23:59:59.000Z

332

Reliability centered maintenance of power transformers and circuit breakers  

SciTech Connect

At the Bonneville Power Administration (BPA), we have historically maintained high voltage equipment. Including transformers and power circuit breakers, on a time driven basis. While this has served our needs in the past, newer methods are needed to effectively maintain the power system in future years. Today aging equipment, maintenance backlogs, and budget constraints are a reality. BPA has initiated a research and development project to examine reliability centered maintenance (RCM) as an alternative to time based maintenance on high voltage equipment. Under RCM, the performance of each place of equipment is to be monitored by observing many operating parameters. For example, with circuit breakers we will observe (measure) the trip time, accumulated contact wear using I{sup 2}T, timing of the mechanism, plus several other parameters. Equipment performing below a predetermined level, or equipment having accumulated a large amount of ``usage`` will receive maintenance. The maintenance will restore full performance and preserve an acceptable service life for that piece of equipment. To develop and evaluate RCM concepts, BPA is installing a prototype system at our Alvey Substation on 4 transformers and 25 breakers.

Purucker, S.L.; Goeltz, R.T. [Oak Ridge National Lab., TN (United States); Hemmelman, K.; Price, R. [Bonneville Power Administration, Van Couver, WA (United States)

1992-08-01T23:59:59.000Z

333

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.  

DOE Green Energy (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

Daniel, Mitch; Gebhards, John; Hill, Robert

2003-05-01T23:59:59.000Z

334

The CERN Accelerator Logging Service- 10 Years in Operation: A Look at the Past, Present and Future  

E-Print Network (OSTI)

During the 10 years since it's first operational use, the scope and scale of the CERN Accelerator Logging Service (LS) has evolved significantly: from an LHC specific service expected to store 1TB / year; to a CERN-wide service spanning the complete accelerator complex (including related sub-systems and experiments) currently storing more than 50 TB / year on-line for some 1 million signals. Despite the massive increase over initial expectations the LS remains reliable, and highly usable - this can be attested to by the 5 million daily / average number of data extraction requests, from close to 1000 users. Although a highly successful service, demands on the LS are expected to increase significantly as CERN prepares LHC for running at top energy, which is likely to result in at least doubling current data volumes. Furthermore, focus is now shifting firmly towards a need to perform complex analysis on logged data, which in-turn presents new challenges. This paper reflects on 10 years as an operational service,...

Roderick, C; Kruk, G

2013-01-01T23:59:59.000Z

335

Results from the second year of operation of the Federal Methanol Fleet at Oak Ridge National Laboratory  

DOE Green Energy (OSTI)

The Oak Ridge National Laboratory has completed its second year of operation of ten vehicles for the Federal Methanol Fleet Project; five of the vehicles are fueled with methanol. Over 56,000 miles were accumulated on the vehicles in the second year bringing the total to over 152,000 miles. Energy consumption for the methanol cars was slightly higher than that of the gasoline cars again this year, most likely as a result of shorter average trip lengths for the methanol gas. Iron and lead have accumulated at greater rates in the lubricating oil of the methanol cars. Driver's ratings of vehicles reflected some dissatisfaction with the cold-weather performance of the methanol cars, but the cars have no special provisions for cold weather starting, and the fuel vapor pressure has not been tailored to the season as at other test sites. Otherwise, drivers' opinions of the methanol cars have been favorable. 13 refs., 4 figs., 10 tabs.

West, B.H.; McGill (Oak Ridge National Lab., TN (USA)); Hillis, S.L. (Tennessee Univ., Knoxville, TN (USA))

1990-09-01T23:59:59.000Z

336

Status of the Atlas Liquid Argon Calorimeter and its Performance after Three Years of LHC Operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions pro- duced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo- rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.5-4.9. The electromagnetic calorimeters use lead as passive material and are characterised by an accordion geometry that allows a fast and uniform az- imuthal response without any gap. Copper and tungsten were chosen as pas- sive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical elec- trodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at approximately 89 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic ra...

Lampl, W; The ATLAS collaboration

2013-01-01T23:59:59.000Z

337

Status of the Atlas Liquid Argon Calorimeter and its Performance after Three Years of LHC Operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo- rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.5-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at approximately 89 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic rays and s...

Lampl, W; The ATLAS collaboration

2013-01-01T23:59:59.000Z

338

Status of the Atlas Liquid Argon Calorimeter and its Performance after two years of LHC operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

AbouZeid, H; The ATLAS collaboration

2012-01-01T23:59:59.000Z

339

Status of the Atlas Liquid Argon Calorimeter and its Performance after three years of LHC operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

De La Torre, H; The ATLAS collaboration

2013-01-01T23:59:59.000Z

340

Status of the ATLAS Liquid Argon Calorimeter; Performance after 2 years of LHC operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at about 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LH...

AbouZeid, H; The ATLAS collaboration

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

342

Naval petroleum and oil shale reserves: Annual report of operations, Fiscal Year 1986  

Science Conference Proceedings (OSTI)

Market prices for curde oil experienced their greatest decline in history during 1986, with substantial effect on the Naval Petroleum and Oil Shale Reserves. Sales procedures which had served the Department well in prior years during periods when oil prices were stable or rising were found inadequate to cope with these declines, and new sales procedures were developed and implemented. Congressional concern that the Government receive fair prices from Naval Petroleum Reserves (NPR) petroleum sales also led to Public Law No. 99-413, enacted on August 29, 1986, which amended title 10, United States Code, Chapter 641. This law sets a minimum price, using two criteria, under which petroleum from the NPR cannot be sold. Notwithstanding the decline in oil and gas prices, revenues from the sale of NPR petroleum totaled $763 million in 1986. Although this represented a 41% decline from 1985 receipts, the 1986 revenues well exceeded net program expenditures of $157 million. Because of the decline in prevailing oil prices during the second quarter of 1986, major cost reductions of $3.4 million were implemented at NPR-3, and even greater reductions are planned for 1987 to ensure the profitability of that field. The decline in energy prices also affected plans to protect natural gas underlying Naval Oil Shale Reserve No. 3 (NOSR-3). Two of 14 planned wells were drilled and are available for production. Unfortunately, efforts to sell gas from these wells have been unsuccessful, and further drilling has been delayed until the gas market is stronger. 16 figs., 20 tabs.

Not Available

1987-01-01T23:59:59.000Z

343

Sootblowing Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information concerning good maintenance practices, condition monitoring, predictive and preventive techniques, probable failure modes, and troubleshooting guidance to personnel involved in the maintenance of sootblowing systems and their components. This guide was developed to provide basic information as well as detailed maintenance and troubleshooting information.

2001-12-20T23:59:59.000Z

344

Maintenance and operation of the U.S. DOE Alternative Fuel Center. Final subcontract report, 5 August 1994--4 August 1995  

DOE Green Energy (OSTI)

The Alternative Fuel Center (AFC) was established by the US Department of Energy (DOE) as part of the Alternative Fuel Utilization Program (AFUP). The AFC is designed to provide drum quantities of finished transportation fuels from a variety of sources. DOE funded the design, construction, and installation of a hydrogenation pilot plant capable of performing a range of hydrotreating, reforming, and hydrocracking operations. Southwest Research Institute provided the building, utilities, and laboratory and safety systems needed for the pilot plant. The AFC work reported here contributes to the two primary objectives of the AFUP: data for alternative-fuel-capable vehicles to enhance energy security, and data for controlling emissions for improved air quality.

Erwin, J.; Moulton, D.S. [Southwest Research Inst., San Antonio, TX (United States)

1996-04-01T23:59:59.000Z

345

Generation Maintenance Application Center: Fuel Gas System for Combustion Turbine Combined Cycle Plant Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the fuel gas system at a gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and operators of CTCC facilities may find ...

2013-05-15T23:59:59.000Z

346

Experimental results from the first year of operation of the solar ground coupling research facility at Brookhaven National Laboratory  

DOE Green Energy (OSTI)

Results from the first year of operation of the solar ground coupling research facility at Brookhaven National Laboratory (BNL) are presented. Nine experiments which are first generation ground coupled heat transfer and storage devices for a solar source heat pump system have been operated since December 1978. A computer program called GROCS which models the heat transfer between these devices and the earth has been written (and subsequently integrated with the solar energy system simulation program TRNSYS by John W. Andrews). In this paper the ground coupling research program, the first generation experiments, and the underground heat flow model GROCS are described. Experimental results from December 1978 to September 1979 are presented and compared to model directions.

Meta, P D

1979-01-01T23:59:59.000Z

347

Infrastructure and Operations | National Nuclear Security Administrati...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Infrastructure and Operations develops and executes NNSA's infrastructure investment, maintenance, and operations programs and policies. Printer-friendly version...

348

Predictive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

349

Wind Turbine Lubrication Maintenance Guide  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, more attention should be paid to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the windmills and the impact on lost generation. Contracts for purchase of their generation output...

2012-06-20T23:59:59.000Z

350

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-12-31T23:59:59.000Z

351

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-01-01T23:59:59.000Z

352

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

353

Kansas State University electric vehicle site operator program. Year 1, second quarter report, October 1, 1991--December 30, 1991  

DOE Green Energy (OSTI)

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State`s Site Operator Program continues to get the ``word-out`` about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State`s G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states`s program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State`s program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

354

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE September 1, 2011 - 12:00pm Addthis The new wire rope before installation. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant's (WIPP) preventive maintenance program paid huge dividends late last month

355

Solar Water Heating System Maintenance and Repair | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

356

Plant maintenance and advanced reactors, 2007  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: A new day for energy in America; Committed to success more than ever, by Andy White, GE--Hitachi Nuclear Energy; Competitive technology for decades, by Steve Tritch, Westinghouse Electric Company; Pioneers of positive community relationship, by Exelon Nuclear; A robust design for 60-years, by Ray Ganthner, Areva; Aiming at no evacuation plants, by Kumiaki Moriya, Hitachi-GE Nuclear Energy, Ltd.; and, Desalination and hydrogen economy, by Dr. I. Khamis, International Atomic Energy Agency. Industry innovation articles in this issue are: Reactor vessel closure head project, by Jeff LeClair, Prairie Island Nuclear Generating Plant; and Submersible remote-operated vehicle, by Michael S. Rose, Entergy's Fitzpatrick Nuclear Station.

Agnihotri, Newal (ed.)

2007-09-15T23:59:59.000Z

357

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

358

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

359

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Sheet for 2013 Nissan Leaf Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 5142013 456 Replaced right front strut NC...

360

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

3CE000672 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6102013 7,426...

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

RM Maintenance Services  

NLE Websites -- All DOE Office Websites (Extended Search)

maintenance forces are responsible for over 118 substations and almost 5300 miles of transmission lines. The Rocky Mountain Region recently updated its Metering Policy. Its...

362

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0DU103929 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine...

363

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

6DU111078 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,362 Changed oil - under warranty...

364

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XBU100914 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6192012 14,694 Replaced one tire and rotated...

365

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

2DU113491 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,466 Changed oil - under warranty...

366

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XDU104313 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2182013 8,513 Changed oil - under warranty...

367

Information Technology for Energy and Maintenance Management  

E-Print Network (OSTI)

We describe the design of a tenant interface for energy and maintenance systems (TIEMS) in commercial buildings. TIEMS is designed for use by occupants (tenants) of commercial buildings. Our hypothesis is that by allowing tenants access to information from the energy and maintenance systems and by giving them some control over these systems, energy and maintenance performance can be improved. We used interviews with potential users and existing energy and maintenance databases to guide the design. Results of a field trial demonstrate the utility of TIEMS. We also describe the design of a maintenance and operations recommender (MORE). MORE uses information from computerized maintenance management systems (CMMS) and energy management and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses the information about what was actually done to solve the problem to learn how to improve its recommendations.

Villafana, L.; Federspiel, C.

2003-01-01T23:59:59.000Z

368

Automated ground maintenance and health management for autonomous unmanned aerial vehicles  

E-Print Network (OSTI)

Automated ground maintenance is a necessity for multi-UAV systems. Without such automation, these systems will become more of a burden than a benefit as human operators struggle to contend with maintenance operations for ...

Dale, Daniel R., M. Eng. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

369

Operation and Maintenance Service Contracts | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify...

370

SunShot Initiative: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

of the awardees, funded by SunShot, that are working to establish O&M best practices: Rooftop Solar Challenge Clean Power Finance (Incubator 6) Tigo (Incubator 6) These...

371

Water clarity meter. Operating and maintenance instructions  

E-Print Network (OSTI)

at this junction would vary from about -23 volts to -110 volts in covering the 5 log cycle range of light flux.slope or sensitivity of the volt- meter. In the- case cf the

Austin, Roswell W

1959-01-01T23:59:59.000Z

372

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

types is beyond the scope of this Web site. Instead, FEMP outlines major equipment types within chapter 9 of the FEMP O&M Best Practices Guide PDF . The FEMP O&M Best...

373

Decision Support for Operations and Maintenance (DSOM ...  

Power plants; Heating and cooling plants; Computer data centers; Water treatment; Energy/electrical distribution; Patents and Patent Applications. ID ...

374

Connecticut Light & Power - Operation and Maintenance Program...  

Open Energy Info (EERE)

Air conditioners, Steam-system upgrades, Compressed air, Programmable Thermostats, Energy Mgmt. SystemsBuilding Controls, Motors, Motor VFDs, Processing and Manufacturing...

375

Nuclear Maintenance Applications Center: Condenser Air Removal Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Air Removal Equipment Maintenance Guide provides power plant maintenance personnel with current maintenance information on this system. This guide will assist the plant maintenance personnel in improving reliability and reducing maintenance costs for the condenser air removal (CAR) equipment.

2007-12-21T23:59:59.000Z

376

Kansas State University Electric Vehicle Site Operator Program. Year 1: First quarter report, July 2, 1991--September 30, 1991  

SciTech Connect

During the past fifteen years Kansas State`s faculty has been involved in research of alternative fuel vehicles. From formulation of fuels and automotive fuel storage to development of electronic controls, K-State`s faculty research has been ongoing. With the increased awareness of what is occurring to the world`s environment, the catalyst -- to ensure applied results from faculty research will occur -- has been activated. The Department of Energy`s Electric Vehicle Site Operator Program is the platform being used to demonstrate international efforts to bring a more acceptable daily mode of transportation to our highways. The first new electrical vehicle procured at K-State in the last ten years, a G-Van, is a technological dinosaur. It does not incorporate leading edge control or drive systems nor does it provide the type of vehicle frame and body to meet a majority of the daily commuter needs required by the American market. Yet, this vehicle represents initial efforts to bring a federally crash certified vehicle to the commercial automotive market. As such, it is an evolutionary step in the mass production of electric vehicle products.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

377

Mining Surveillance and Maintenance Dollars  

Science Conference Proceedings (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

378

Surveillance & Maintenance: The Requirements Based Surveillance and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

379

SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND MAINTENANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change.

380

Preventive Maintenance of Transport Vehicles: Is It Improving ...  

Science Conference Proceedings (OSTI)

After 10 years of experience with running state of the art maintenance practices in Russia, India and ... A MIMO Modeling Strategy for Bath Chemistry · A Study of ...

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Nuclear Maintenance Applications Center: Condenser Cleaning Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides power plant maintenance personnel with current maintenance information on condenser cleaning systems. The report will help these personnel to improve the reliability and reduce the maintenance costs for the condenser cleaning equipment used in power plants.

2007-12-21T23:59:59.000Z

382

Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations  

Science Conference Proceedings (OSTI)

This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

G. B. Mitchem

2001-08-22T23:59:59.000Z

383

Big Spring Wind Power Project First-Year Operating Experience: 1999-2000: U.S. Department of Energy-EPRI Wind Turbine Verification P rogram  

Science Conference Proceedings (OSTI)

The 34-MW Big Spring wind power plant is sited on elevated tabletop mesas near Big Spring, Texas. Under a power purchase agreement between the project owner and operator, York Research Corporation (York), and TXU Electric and Gas (TXU), York will supply wind energy to TXU for 15 years. This report describes Big Spring's first-year operating experience. The lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects, especially those lo...

2000-12-18T23:59:59.000Z

384

Advanced Electric Motor Predictive Maintenance Project  

Science Conference Proceedings (OSTI)

EPRI sponsored the three-year Advanced Electric Motor Predictive Maintenance (AEMPM) project in 2000 to increase the effectiveness of motor maintenance at a time when utilities were in a state of declining motor knowledge due to downsizing and restructuring. The project identified areas for improvement that were common to most utilities and selected appropriate measures to address these concerns. Areas addressed include documenting motor knowledge, increasing utility confidence in newer technologies and ...

2003-05-28T23:59:59.000Z

385

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

386

Maintenance | OpenEI Community  

Open Energy Info (EERE)

Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

387

MANAGING THE NATIONAL ROAD NETWORK MAINTENANCE IN SPAIN Vctor Gmez Fras  

E-Print Network (OSTI)

, then to establish a maintenance policy. Finally, the Management System calculates a maintenance plan, detailingMANAGING THE NATIONAL ROAD NETWORK MAINTENANCE IN SPAIN Víctor Gómez Frías GETINSA (Spain), vgomez technical, economic and administrative management models. The Subdirectorate of Maintenance and Operation

Paris-Sud XI, Université de

388

Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009  

Science Conference Proceedings (OSTI)

This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

Howard Forsythe

2010-02-04T23:59:59.000Z

389

Coaxial 30 kV Connectors for the RG220/U Cable 20 Years of Operational Experience  

E-Print Network (OSTI)

For the fast pulsed magnet system of CERN's SPS and LEP particle accelerators, a special type of moulded coaxial high voltage cable connector is used in large quantities. These connectors are mounted on coaxial transmission lines, which connect pulse generators in buildings at ground level to the fast pulsed magnets situated in an underground tunnel. Well over 1500 such connectors have already been installed and many more will be needed for the construction of the LHC. This 14 TeV Large Hadron Collider, which has a circumference of 27 km, is now under construction at CERN. The paper summarizes the operational experience over the last 20 years and the design principles of the connector. It explains how the excellent reliability and the extremely low failure rate were achieved and outlines the causes of the rare replacements. The paper also discusses the ageing effects caused by radiation, as well as wear and tear during installation and manipulation. Finally it gives a report on our experience with coaxial con...

Mayer, M

2000-01-01T23:59:59.000Z

390

Static Seals Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides comprehensive technical information on the understanding and maintenance of static seals. It is designed to help utility staffs maintain static seals and minimize and trouble shoot leakage problems that can reduce plant availability.

1994-09-22T23:59:59.000Z

391

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0CE002590 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1252013 7,925 Changed oil and filter and...

392

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7CE000612 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1172013 6,327 Changed oil and filter and...

393

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

5CE002486 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 212013 7,892 Changed oil and filter and...

394

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

8BU100815 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 882012 17,160 Changed oil and filter and...

395

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU2A5010462 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 11232009 5,935 Changed oil and filter,...

396

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU5A0006063 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 8192009 5,090 Changed oil and filter and...

397

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP8D3038660 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6222013 6,331 5K service -...

398

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6132013 5,220 5K service - under...

399

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP6D3038663 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6122013 5,078 5K service -...

400

Electric and hybrid vehicle program; Site Operator Program. Quarterly progress report, January--March 1992 (Second quarter of fiscal year 1992)  

DOE Green Energy (OSTI)

Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

Warren, J.F.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

TMS 2010 Managing Smelter Operations in Turbulent Times  

Science Conference Proceedings (OSTI)

Introduction and financial impact; Operating efficiency improvement; Production volume adjustments; Maintenance strategies and practices; Procurement and ...

402

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE MAINTENANCE Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of

403

Nuclear Maintenance Applications Center: Feed Pump Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Steam Turbines and Auxiliaries Program 65 and the Nuclear Maintenance Application Center have developed a series of maintenance guides to assist plant personnel with the performance of various maintenance tasks associated with a wide variety of plant components. The objective of this project was to publish a maintenance guide for the feed pump turbines that included an ...

2012-09-25T23:59:59.000Z

404

Minthorn Springs Creek Summer Juvenile Release and Adult Collection Facility; Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1989 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding and spawning adult steelhead and acclimation and release of juvenile salmon and steelhead. Regularly-scheduled maintenance was completed in 1989. Equipment and pumps received maintenance and repair. An automatic dialing system was incorporated into the alarm system at the Minthorn facility. A security company has replaced the function of the Umatilla Tribal Police which was to contact fisheries personnel in case of an alarm. The configuration of the alarm system was upgraded to activate the alarm faster and provide better access to project personnel with a pager system. A survey was completed in 1988 by Thomas Bumstead of Albrook Hydraulics Lab in Pullman, WA. to determine potential measures to address the change in course of the Umatilla River around Minthorn as a result of the flood of 1986. Options and recommendations were submitted in a report in 1989. Fish Management Consultants Inc. submitted the final reports of evaluations for both the Bonifer and Minthorn facilities. A total of 150 adult steelhead were collected for broodstock at Threemile Dam from December through March and held at Minthorn. Forty-two pairs were spawned (37 pairs from Minthorn and 5 pairs collected and immediately spawned at Threemile Dam). The 241,682 eggs were transferred to Irrigon Hatchery for incubation and later moved to Oak Springs Hatchery for rearing. An estimated 368 adult hatchery steelhead returned to the Umatilla River in 1988-89 (based on Threemile Dam trap counts and harvest below Threemile Dam) these, and 349 were released upriver. Of seven returned to the Bonifer trap where the smolts were initially released. Acclimation of 79,984 spring chinook salmon and 22,274 steelhead was completed at Bonifer in spring of 1989. At Minthorn, 157,299 coho salmon and 29,852 summer steelhead were acclimated and released. Acclimation of 78,825 fall chinook salmon at Minthorn and 80,750 spring chinook salmon completed in the fall. at Bonifer was successfully Control groups were released instream concurrent with the acclimated releases to evaluate the effects of acclimation on adult returns to the Umatilla River. Test and control groups were tagged by ODFW for acclimation studies to be performed at the Bonifer and Minthorn facilities in 1989 and 1990. Each group received three separate coded-wire tag codes. One experiment for fall chinook salmon, two experiments for spring chinook salmon (spring and fall releases) and one experiment for summer steelhead were tagged. The progress of outmigration for acclimated releases was monitored at the juvenile salmonid trap located at Westland Diversion. Because the fish in each release were not uniquely fish size and migration timing were used to discern general trends. Data suggested that juvenile salmonids started showing up at the trap 4 days after release until July 14, when sampling was discontinued. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids to test summer steelhead broodstock from the Umatilla River for monitoring purposes and to certify eggs as pathogen-free.

Lofy, Peter T.; Rowan, Gerald D.

1990-03-01T23:59:59.000Z

405

Guidelines for Transitioning from Time-Based Maintenance to Condition-Based Maintenance  

Science Conference Proceedings (OSTI)

BackgroundUtilities have provided feedback to the Electric Power Research Institute (EPRI) that they do not feel that they have fully capitalized on past optimization projects. Current living programs using classical predictive maintenance technologies, component and system testing programs, existing maintenance backlogs, system monitoring, system health, and operator feedback to provide a more complete picture of equipment condition may be providing more insight into ...

2013-11-13T23:59:59.000Z

406

Nuclear Maintenance Applications Center: Passive Component Maintenance Guide for Nuclear Power Plant Personnel  

Science Conference Proceedings (OSTI)

The information contained in this report represents a significant collection of technical and human performance information, including techniques and good practices, related to the design, maintenance, and operation of passive components common at most domestic nuclear power plants. Assemblage of this information provides a single point of reference for plant engineering and maintenance personnel, both in the present and in the future. Through the use of this guideline, in close conjunction with the indu...

2011-11-16T23:59:59.000Z

407

Tennessee Valley Authority Buffalo Mountain Wind Power Project First- and Second-Year Operating Experience: 2001-2003: U.S. Departme nt of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the turbine performance and operating experience from July 2001 through June 2003 at the Tennessee Valley Authority (TVA) Buffalo Mountain Wind Power Project, located near Oliver Springs, Tennessee. The report summarizes the project's wind resource data, energy production, availability, operation and maintenance experience, and power curve performance measurements. Lessons learned from the project will be valuable to other utilities or companies planning similar wind power projects.

2003-12-22T23:59:59.000Z

408

Development of Low-Maintenance Protection and Control Systems  

Science Conference Proceedings (OSTI)

Protection and control (P&C) system maintenance is a critical task and requirement for the reliability of power grid. Traditionally, electro-mechanic devices require regular calibration and maintenance for proper operations. Thus, time-based maintenance programs have been developed by utilities and have not changed much even after the industry migrated to the microprocessor and communication-based digital protection technologies. The Electric Power Research Institute (EPRI) Protection and Control Task Fo...

2011-12-13T23:59:59.000Z

409

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

410

Ten Years of Compressed Natural Gas (CNG) Operations at SunLine Transit Agency: April 2003--December 2004  

Science Conference Proceedings (OSTI)

This report focuses on the lesson learned at the SunLine Transit Agency after it converted in 1994 its entire operating transit bus fleet to compressed natural gas (CNG).

Chandler, K.

2006-01-01T23:59:59.000Z

411

The Meteorological Model BOLAM at the National Observatory of Athens: Assessment of Two-Year Operational Use  

Science Conference Proceedings (OSTI)

Since November 1999, the hydrostatic meteorological Bologna Limited-Area Model (BOLAM) has been running operationally at the National Observatory of Athens. The assessment of the model forecast skill during the 2-yr period included (a) ...

K. Lagouvardos; V. Kotroni; A. Koussis; H. Feidas; A. Buzzi; P. Malguzzi

2003-11-01T23:59:59.000Z

412

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

413

FMAC: Coal-Handling Maintenance Guide  

Science Conference Proceedings (OSTI)

The Coal Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for the coal handling system.

2006-12-22T23:59:59.000Z

414

Turbine-Generator Auxiliary Systems, Volume 2: Turbine Steam Seal System Maintenance Guide  

Science Conference Proceedings (OSTI)

The Turbine-Generator Auxiliary Systems, Volume 2: Turbine Steam Seal System Maintenance Guide provides nuclear and fossil plant personnel with operation and maintenance guidance on the turbine steam seal system components.

2006-12-14T23:59:59.000Z

415

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

416

CH Packaging Maintenance Manual  

SciTech Connect

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

417

Lawn Maintenance Safety  

E-Print Network (OSTI)

Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes and legs. You can avoid accidents like these by following the safety guidelines in this publication.

Smith, David

2005-07-12T23:59:59.000Z

418

Web Recency Maintenance Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a new protocol namely Web Recency Maintenance Protocol (WRMP) that employs "push" mechanism to maintain the currency of the World Wide Web (WWW) at Search Engine (SE) site. As of this writing SEs are adopting "pull" technology, ...

K. Satya Sai Prakash; S. V. Raghavan

2002-12-01T23:59:59.000Z

419

Maintenance and Application Guide for Control Relays and Timers  

Science Conference Proceedings (OSTI)

Reliable performance of control and timing relays is vital to the efficient operation of nuclear plants. This guide provides utilities practical, cost-effective methods for a control relay and timer maintenance program. It can help utilities optimize test and maintenance intervals while limiting expenditures.

1993-10-02T23:59:59.000Z

420

Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) Version 2  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine (CT) axial compressor performance. Utilities can use it to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash.

2000-11-29T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Wavelet based analysis of circuit breaker operation  

E-Print Network (OSTI)

Circuit breaker is an important interrupting device in power system network. It usually has a lifetime about 20 to 40 years. During breaker's service time, maintenance and inspection are imperative duties to achieve its reliable operation. To automate the diagnostic practice for circuit breaker operation and reduce the utility company's workload, Wavelet based analysis software of circuit breaker operation is developed here. Combined with circuit breaker monitoring system, the analysis software processes the original circuit breaker information, speeds up the analysis time and provides stable and consistent evaluation for the circuit breaker operation.

Ren, Zhifang Jennifer

2006-05-01T23:59:59.000Z

422

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

This technical reference expands on the original reliability centered maintenance (RCM) research performed by EPRI in the late 1990s. It incorporates nearly ten years of utility RCM experience in power delivery and emphasizes the requirements of managing and measuring maintenance programs. RCM's overall goal is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. This "Technical Reference for Power Delivery" serves as the "handbook" of RCM for the...

2003-12-10T23:59:59.000Z

423

TRUPACT-II Container Maintenance Program Plan  

Science Conference Proceedings (OSTI)

This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers.

Not Available

1991-05-01T23:59:59.000Z

424

Maintenance Work Management -- Best Practices Guidelines: Maintenance Assessment and Improvement  

Science Conference Proceedings (OSTI)

This report on maintenance work management best practices is part of EPRI's Plant Maintenance Optimization (PMO) development efforts. Based on a series of assessment and improvement projects, the report describes the process and typical results.

1998-03-12T23:59:59.000Z

425

USE OF THE DRY MAINTENANCE FACILITY FOR HRT MAINTENANCE  

SciTech Connect

A portable shield was utilized in performing nine semidirect dry maintenance jobs on the HRT. The shield proved to be completely reliable, affording a considerable savings in maintenance costs and reactor downtime. (auth)

Jarvis, J.P.

1962-09-17T23:59:59.000Z

426

Green Mountain Power Wind Power Project Third-Year Operating Experience: 1999-2000: U.S. Department of Energy-EPRI Wind Turbine Veri fication Program  

Science Conference Proceedings (OSTI)

The 6.05-MW Green Mountain Power (GMP) wind power project is located on top of a wooded ridge in the Green Mountains of southern Vermont near the town of Searsburg. This report describes the third-year operating experience at the GMP wind project. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2000-12-07T23:59:59.000Z

427

Kotzebue Electric Association Wind Power Project Third-Year Operating Experience: 2001-2002: U.S. Department of Energy - EPRI Wind T urbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the third-year operating experience and expansion of the 0.76-MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2002-12-13T23:59:59.000Z

428

Kotzebue Electric Association Wind Power Project Second-Year Operating Experience: 2000-2001: U.S. Department of Energy-EPRI Wind Tu rbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the second-year operating experience at the 0.66-MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. Lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2001-11-30T23:59:59.000Z

429

Wisconsin Low Wind Speed Turbine Project Third-Year Operating Experience: 2000-2001: U.S. Department of Energy - EPRI Wind Turbine V erification Program  

Science Conference Proceedings (OSTI)

This report describes the third-year operating experience at the 1.2-MW Low Wind Speed Turbine Project (LWSTP) in Glenmore, Wisconsin. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2001-12-06T23:59:59.000Z

430

Kotzebue Electric Association Wind Power Project Fourth-Year Operating Experience: 2002-2003: U.S. Department of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the fourth-year operating experience and expansion of the 0.76 MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2003-12-15T23:59:59.000Z

431

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report for July through September 1994 (Fourth quarter of fiscal year 1994)  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the US. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: advancement of electric vehicle technologies; development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. The ultimate thrust of program activities varies among sites, reflecting not only the Operator`s business interests but also geographic and climate-related operating conditions. This fourth quarter report (FY-94) includes a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now found in Appendix A.

Kiser, D.M.; Brown, H.L.

1995-03-01T23:59:59.000Z

432

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

433

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

434

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

435

HVAC Maintenance and Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

436

Reactive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

437

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network (OSTI)

to refine the system details, interfaces and the requirements for remote handling. Table 1. FIRE RadialInsulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM objectives and subsystem requirements in an arrangement that allows remote maintenance of in

438

Preventive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

439

UPS Maintenance and Application Guide: Revision of TR-100491  

Science Conference Proceedings (OSTI)

This guide provides maintenance recommendations to plant personnel involved in the reliable operation of uninterruptible power supply (UPS) systems. It identifies potential failure modes, basic troubleshooting techniques, and preventive measures, as well as a basic background description of UPS systems.

2002-12-03T23:59:59.000Z

440

First year's operation experience of the deepest SPM (Single Point Mooring) in the world  

SciTech Connect

The British National Oil Corp. had a Single Anchor Leg Mooring (SALM) installed at the Thistle Field in Apr. 1977 for export loading of tankers pending completion of the Brent System 36 in. pipeline to Sullom-Voe, which became operational in Dec. 1978; the SALM will continue to be maintained in good condition as a standby alternative export outlet. Modification of the original three 80,000 dwt tankers during 1977 provided the original design capacity of an 80,000 dwt tanker, but with added clean ballast capacity to eliminate tank cleaning and treatment of dirty ballast water. A fully integrated tanker/SALM/platform instrumentation system monitors mooring loads, buoy and riser angles, and tanker status; the latter being radio telemetered to the nearby block platform. Operation of the system and necessary modifications are described.

Millar, J.L.; Hughes, H.; Dyer, R.C.

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation maintenance year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Kansas State University: DOE/KEURP Site Operator Program. Year 4, fourth quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect

Kansas State University, in support of a DOE and Kansas Electric Utilities Research Program subject contract, continues to test, evaluate, demonstrate, and develop electric vehicle and infrastructure technology. K-State is operating two Soleq EVcort vehicles. During this reporting period both vehicles were brought back to full operational status after warranty service was completed by Soleq. Vehicle failures occurred due to three unrelated battery cable failures in addition to the replacement of one battery. Both vehicles are being operated on a routine basis. K-State, along with York Technical College, has established a relationship with Troy Design and Manufacturing (TDM) Redford, Michigan. K-State has ordered no less than four Ford Ranger electric trucks from TDM. K-State is involved in the steering committee that is monitoring and refining information to direct the design and testing of these new technology vehicles. TDM should become the first automotive manufacturer certified by one of the Big Three under their Quality Vehicle Manufacturer program. Kansas State University and the Kansas Electric Utility Research Program look forward to working with TDM on their new EV program.

1995-08-01T23:59:59.000Z

442

The Impact of Maintenance on Packaged Unitary Equipment  

Science Conference Proceedings (OSTI)

This report summarizes the findings of a two-year study of the energy and demand impacts of maintenance on rooftop packaged heating and cooling equipment. The purpose of the project was to determine if energy consumption and peak demand reductions could be reliably obtained through the implementation of proper maintenance on unitary packaged equipment in the three to ten ton range.

1997-05-29T23:59:59.000Z

443

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.  

SciTech Connect

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

LaFreniere, L. M. (Environmental Science Division)

2011-09-13T23:59:59.000Z

444

First-Year Operation of a New Water Vapor Raman Lidar at the JPL Table Mountain Facility, California  

Science Conference Proceedings (OSTI)

A new water vapor Raman lidar was recently built at the Table Mountain Facility (TMF) of the Jet Propulsion Laboratory (JPL) in California and more than a year of routine 2-h-long nighttime measurements 4–5 times per week have been completed. The ...

Thierry Leblanc; I. Stuart McDermid; Robin A. Aspey

2008-08-01T23:59:59.000Z

445

Electric Motor Tiered Maintenance Program  

Science Conference Proceedings (OSTI)

Electric motor predictive and preventive maintenance guidance has been developed to provide information to help maximize motor reliability and to minimize the need for major motor repairs. However, if all recommendations presented in most guides are followed and applied to all motors, the cost of motor maintenance would be unwieldy and consume more than its share of maintenance budgets.

2002-08-27T23:59:59.000Z

446

Bottom Ash System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the bottom ash system and its components, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed primarily to provide detailed maintenance and troubleshooting information but also includes basic system information.

2000-10-31T23:59:59.000Z

447

Predictive Maintenance Program Implementation Experience  

Science Conference Proceedings (OSTI)

Predictive maintenance (PDM) is a process of collecting data, assessing machinery condition, and deciding when to perform maintenance. PDM saves money and improves machinery reliability as compared to preventive or corrective maintenance. This report describes the implementation of PDM programs at Commonwealth Edison's (ComEd's) fossil power plants.

1998-12-29T23:59:59.000Z

448

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

449

Safety and Relief Valve Testing and Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide gives a broad overview of self actuated and power operated pressure relief devices (PRDs) -- safety, relief, safety relief, and power-operated relief valves -- and their application and maintenance. The non-reclosing devices, like the rupture discs, are outside the scope of this guide. The information in this guide, though directed towards the nuclear power plant personnel, will assist all power plant personnel responsible for the maintenance of PRDs. This guide can also be used by training in...

1996-10-02T23:59:59.000Z

450

Iowa / Nebraska Distributed Wind Generation Projects First and Second-Year Operating Experience: 1999-2001: U.S. Department of Energ y - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

The Wind Turbine Verification Program (TVP) is a collaborative effort of the U.S. Department of Energy (DOE), EPRI, and host utilities to develop, construct, and operate wind power plants. This report describes the first- and second-year operating experience at the 2.25-MW Iowa Distributed Wind Generation Project (IDWGP) in Algona, Iowa, and the 1.5-MW Nebraska Distributed Wind Generation Project (NDWGP) in Springview, Nebraska. The lessons learned in both projects will be valuable to other utilities pla...

2001-12-03T23:59:59.000Z

451

HVAC Maintenance and Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Maintenance and Technologies HVAC Maintenance and Technologies Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility...

452

Machine Maintenance Integrated Performance Support System  

SciTech Connect

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

453

Hardware Development of a Laboratory-Scale Microgrid Phase 1--Single Inverter in Island Mode Operation: Base Year Report, December 2000 -- November 2001  

SciTech Connect

This report summarizes the activities of the first year of a three-year project to develop control software for micro-source distributed generation systems. The focus of this phase was on internal energy storage requirements, the modification of an off-the-shelf motor drive system inverter to supply utility-grade ac power, and a single inverter system operating in island mode. The report provides a methodology for determining battery energy storage requirements, a method for converting a motor drive inverter into a utility-grade inverter, and typical characteristics and test results of using such an inverter in a complex load environment.

Venkataramanan, G.; Illindala, M. S.; Houle, C.; Lasseter, R. H.

2002-11-01T23:59:59.000Z

454

Programmatic agreement among the USDOE/RL Operations Office, the Advisory Council on Historic Preservation, and the WA State Historic Preservation Office for the maintenance, deactivation, alteration and demolition of the built environment on the Hanford Site, Washington  

SciTech Connect

This Programmatic Agreement (PA) addresses the built environment (i.e., buildings and structures) constructed during the Manhattan Project and Cold War Era periods of Hanford`s operational history. As such it encompasses the years 1943 through 1990. The identification, evaluation, and treatment of buildings and historic archeological remains on the Hanford Site predating 1943 will be accomplished through Sections 800.4 through 800.6 of the Council`s regulations. This PA will be in effect from the date of signature until September 30, 2000. Completion of the Sitewide Treatment Plan established under this PA satisfies all Section 106 requirements for identification, evaluation, and treatment necessary for all undertakings, up to and including demolition which may affect Manhattan Project and Cold War Era properties. This PA may be extended if the Sitewide Treatment Plan has not been completed by the end of FY 2000. Identification, evaluation, and treatment of properties constructed on the Hanford Site after 1990 will be handled pursuant to the regulations in effect at the time such properties are eligible for review.

Lloyd, D.W.

1997-08-01T23:59:59.000Z

455

Report on Matters Identified at the Richland Operations Office During the Audit of the Department's Consolidated Fiscal Year 1996 Financial Statements, WR-FS-97-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT ON MATTERS IDENTIFIED AT THE RICHLAND OPERATIONS OFFICE DURING THE AUDIT OF THE DEPARTMENT S CONSOLIDATED FISCAL YEAR 1996 FINANCIAL STATEMENTS The Office of Inspector General wants to make the distribution of its audit reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov

456

Big Spring Wind Power Project Third- Through Fifth-Year Operating Experience: 2001-2004: U.S. Department of Energy-EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the third-, fourth-, and fifth-year operating experience at the 34-MW Big Spring Wind Power Plant near Big Spring, Texas. The project consists of 42 Vestas V47 wind turbines installed on 65-m (213-ft) towers and four Vestas V66 wind turbines installed on 80-m (262-ft) towers. Lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects.

2004-10-25T23:59:59.000Z

457

Big Spring Wind Power Project Second-Year Operating Experience: 2000-2001: U.S. Department of Energy - EPRI Wind Turbine Verificatio n Program  

Science Conference Proceedings (OSTI)

This report describes second-year operating experience at the 34 MW Big Spring Wind Power Plant near Big Spring, Texas. The project consists of 42 Vestas V47 wind turbines installed on 65-meter (213-foot) towers and 4 Vestas V66 wind turbines installed on 80-meter (262-foot) towers. The lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects.

2001-12-06T23:59:59.000Z

458

Kotzebue Electric Association Wind Power Project First-Year Operating Experience: 1999-2000: U.S. Department of Energy - EPRI Wind T urbine Verification Program  

Science Conference Proceedings (OSTI)

Although much of western Alaska has abundant wind resources, wind energy technology has not been widely deployed in the state, and utilities rely primarily on diesel fuel for energy generation. Kotzebue Electric Association is pioneering the application of wind energy technology in combination with the existing diesel generation in the remote communities in Northwest Alaska. This report describes the first-year operating experience at the 0.66-MW Kotzebue Electric Association (KEA) wind power project nea...

2000-12-13T23:59:59.000Z

459

Wisconsin Low Wind Speed Turbine Project First- and Second-Year Operating Experience: 1998-2000: U.S. Department of Energy-EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

The 1.2 MW Low Wind Speed Turbine Project (LWSTP) -- installed in Glenmore, Wisconsin, in early 1998 -- was the first commercial-scale wind project in Wisconsin. This report describes the first- and second-year operating experience at the LWSTP. The lessons learned in the project will be valuable to other utilities planning similar wind power projects, particularly in cold-weather, moderate wind resource areas.

2000-12-15T23:59:59.000Z

460