Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

2

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

3

Amendment No.: 185. Renewed Facility Operating License  

E-Print Network (OSTI)

Brief description of amendment: The amendments revise the facility operating license to delete Section 2.G.1 of the Facility Operating License, which requires reporting of violations of the requirements in Section 2, items C(1), C(3) though (33), E, F, K, and L of the Facility Operating License. The proposed amendment would also delete Section 6.6 of the Technical Specifications (TSs) regarding reportable events. Section 6.6 of the TSs are redundant to requirements that have since been embodied in the regulations and, accordingly, may be deleted from the TS.

Virgil C. Summer Nuclear Station

2011-01-01T23:59:59.000Z

4

Combined Operating License Model Program Plan  

Science Conference Proceedings (OSTI)

The Model Program Plan (MPP) provides functional guidance on how to prepare a Combined Operating License (COL) application for a new nuclear power facility when incorporating previous findings from both design certification (DC) and an early site permit (ESP) proceedings. The plan identifies the activities necessary to prepare an application and provides guidance on planning and managing a COL program, including working with DC and ESP holders and using subcontracted resources to develop necessary new in...

2003-11-17T23:59:59.000Z

5

Non-Power Reactor Operator Licensing Examiner Standards. Revision 1  

SciTech Connect

The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

NONE

1995-06-01T23:59:59.000Z

6

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

7

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

8

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Updates available at: http://www.nuclear.gov NEXT UPDATE - April 2013 Page 1 News Updates  On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013.  On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

9

Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1992-03-01T23:59:59.000Z

10

Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1995-04-01T23:59:59.000Z

11

Licensed operating reactors. Status summary report data as of December 31, 1993  

SciTech Connect

The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

Hartfield, R.A.

1994-03-01T23:59:59.000Z

12

Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20  

Science Conference Proceedings (OSTI)

The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1996-06-01T23:59:59.000Z

13

Executive Director for Operations RENEWAL OF FULL-POWER OPERATING LICENSE FOR PILGRIM NUCLEAR POWER STATION  

E-Print Network (OSTI)

This paper (1) requests that the Commission authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to renew the operating license for Pilgrim Nuclear Power Station (PNPS) for an additional 20 years, and (2) informs the Commission of the results of the U.S. Nuclear Regulatory Commission (NRC) staffs review of the PNPS license renewal application (LRA) (Ref. 1) submitted by Entergy Nuclear Generation Company (Entergy Nuclear) and Entergy Nuclear Operations, Inc. (ENO) (owner and operator, respectively, of PNPS). In the Staff Requirements Memorandum for SECY-02-0088, Turkey Point Nuclear Plant, Units 3 and

R. W. Borchardt

2012-01-01T23:59:59.000Z

14

Research License Agreement Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Research License Template Research License Template RESEARCH LICENSE Between Alliance for Sustainable Energy, LLC And [COMPANY or UNIVERSITY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at 1617 Cole Blvd., Golden, Colorado 80401 and [COMPANY or UNIVERSITY NAME], (hereinafter "Research Licensee"), a [FOR-PROFIT or NON-PROFIT] entity organized and existing under the laws of the State of [NAME of STATE] and having a principal place of business at [ADDRESS], hereinafter referred

15

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

16

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase...

17

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

18

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

award of the (Date) ENERGY STAR: Plant name Plant street address Plant city, state, zip code As documented by the attached Statement of Energy Performance, I affirm that the...

19

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

20

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

22

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

23

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

24

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

25

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and...

26

Reference: Additional Radiation Dose Information Supporting the License Amendment Request to Permit Uprated Power Operation  

E-Print Network (OSTI)

In the referenced letter, Commonwealth Edison Company, now Exelon Generation Company (EGC), LLC, submitted a request for changes to the operating licenses and Technical Specifications for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2, to allow operation with an extended power uprate. In an August 7, 2001, teleconference between representatives of EGC and Mr. L. W. Rossbach and other members of the NRC, the NRC requested additional information regarding these proposed changes. The attachment to this letter provides the requested information. Should you have any questions concerning this letter, please contact Mr. A. R. Haeger at (630) 657-2807.

Exelon Genetation; K. A. Ainger

2001-01-01T23:59:59.000Z

27

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

28

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

29

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

30

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

31

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

32

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

33

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

34

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

35

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

36

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

37

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

38

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

39

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

40

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

42

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

43

License Agreements  

Science Conference Proceedings (OSTI)

Standard Reference Database NIST 23 REFPROP License Information. Single Location License. A single location license ...

2013-05-06T23:59:59.000Z

44

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

45

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

46

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

47

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

48

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

49

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

50

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

51

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

52

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

53

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

54

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

55

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Los Alamos National Security, LLC ("LANS"), under its United States Department of Energy ("DOE") Contract No. DE-AC52-06NA25396, to manage and operate Los Alamos National Laboratory ("LANL"), and ______________________________________, a _____________________________ corporation Company Name ("LICENSEE") (State of Incorporation) having its principal place of business at: ________________________________________________________________________________________ (Company Address) is effective on the date of execution by the last signing Party and payment of the License Issue Fee

56

Date Date Date Date Date  

E-Print Network (OSTI)

This thesis investigates the problem of regulating the temperature of a conditioned space using a Solar Assisted Air Conditioning Systems (SAACS) prototype located at Cabo Rojo, Puerto Rico. The SAACS Prototype consists of a 66 flat plate solar collector array with 115.4 m 2 of selective surface area, a 35 kW single-effect lithium-bromide absorption chiller, a 84 kW cooling tower, a 50 kW auxiliary hot water boiler, a 5700 liter storage tank equipped with flexible stratification manifolds, and a 1800 l/hr air-handling unit. A discrete-time state-space model of the absorption chiller and a linear model of the plant to be controlled (the conditioned space) are identified and presented. Experimental data was used for the determination of these models. A temperature controller was designed and applied to the plant model. This controller operates the absorption chiller under multiple load conditions and regulates the flow in the chilled water line based on the conditioned space requirements. The designed controller was implemented in the SAACS prototype. The systems

Carlos A. Gonzlez Lozano; Miguel Vlez Reyes, Ph.D.; Gerson Beauchamp Bez, Ph.D., Ph.D.

2004-01-01T23:59:59.000Z

57

for Renewal of Operating Licenses for Nuclear Power Plants. " The staff determined that the  

E-Print Network (OSTI)

LRA was complete and acceptable for docketing on May 15, 2009 (74 FR 22978). The staff has reviewed the PVNGS LRA, conducted site audits, issued requests for additional information (RAls), reviewed the applicant's responses to the staffs RAls, developed its "Safety Evaluation Report with Open Item Related to the License Renewal of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 " (SER with Open Item), and reviewed the applicant's comments on the SER with Open Item. The SER with Open Item was discussed at an Advisory Committee on Reactor Safeguards (ACRS) subcommittee meeting on September 8,2010. The staff has closed the open item discussed in the SER with Open Item. Section 1.5 of the attached "Safety Evaluation Report Related to the License Renewal of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 " (SER), provides a summary of the open item including actions to close the item. On the basis of this review, the staff has developed the enclosed SER to document its findings associated with the safety review of the LRA and supporting documentation. This SER is scheduled to be discussed at the ACRS full committee meeting on

United States; Mr. Randall; K. Edington

2011-01-01T23:59:59.000Z

58

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

and operate Lawrence Livermore National Laboratory ... which may be useful for human health treatment ... Licensed Service means the use of Licensed ...

59

READY-TO-SIGN NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Bullet Detection Tracking and Stopping System Company Name 1/7 TL0_____ Date READY-TO-SIGN NONEXCLUSIVE . PATENT LICENSE AGREEMENT . This license agreement ...

60

Executive Director for Operations STATUS OF EFFORTS TO FINALIZE REGULATIONS FOR RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION:URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

This paper provides information to the Commission and requests approval by negative consent of the staff's proposed alternative for proceeding with final rulemaking to amend criterion 6 of 10 CFR Part 40, Appendix A in order to provide radiological criteria for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-97-046A, dated May 21, 1997, the Commission instructed staff to develop a rule that addresses radiological criteria (decommissioning land and buildings) for license termination for uranium recovery facilities, i.e., uranium mills and in-situ leach facilities (ISLs), on an expedited basis. The staff has requested additional public comment on this issue, and is preparing a final rule for Commission approval. If the Commission approves the staff's recommended approach, the final rulemaking package will be forwarded to the Commission within 5 months after receiving approval. If the Commission selects an alternative approach, an additional opportunity for public comment may be necessary. A discussion of the alternatives considered is in Attachment 1. Attachment 2 is a differing viewpoint (as allowed under Office of Nuclear Material Safety and Safeguards Policy and Procedures Letter 1-8, Revision 4, December 1996) on the approach delineated in this Commission Paper, submitted by a staff member on April 8, 1998. A differing viewpoint is an allowed alternative to a Differing Professional View (DPV) or a Differing Professional Opinion (DPO). This alternative allows employees to document their differing professional views and attach these views to proposed staff positions or other documents, to be forwarded as the document moves through the management chain. Attachment 3 contains the dose modeling assumptions and results that support the staff's recommended approach. CONTACT:

L. Joseph Callan /s; Elaine Brummett Nmss/dwm

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

License extension for the MIT research reactor  

Science Conference Proceedings (OSTI)

On February 8, 1995, the U.S. Nuclear Regulatory Commission (NRC) amended the operating license for the Massachusetts Institute of Technology (MIT) research reactor (MITR) by extending its expiration date from May 7, 1996, to August 8, 1999. This increase of 2.25 yr in the duration of the license was for the purpose of recapturing construction time. Extensions of this type have routinely been granted to power plants. The significance of the present action is that it is the first such extension ever granted to a research reactor. This paper describes the basis for the amendment request and the supporting safety analysis.

Bernard, J.A. [Massachusetts Institute of Technology, Cambridge, MA (United States)

1995-12-31T23:59:59.000Z

62

Nuclear Power 2010 Program Lessons Learned Report on the Combined Construction and Operating License/Design Certification Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report August 30, 2012 Prepared by Longenecker and Associates DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

63

BIOLOGICAL ASSESSMENT FOR BALD EAGLES FOR LICENSE RENEWAL  

E-Print Network (OSTI)

The Nuclear Regulatory Commission (NRC) is evaluating an application submitted by Virginia Electric and Power Company (VEPCo) for the renewal of the operating licenses for an additional 20 years for its Surry Power Station (SPS), Units 1 and 2. The SPS is located on the Gravel Neck Peninsula in Surry County, Virginia. The current license for Unit 1 will expire on May 25, 2012, and for Unit 2 on January 29, 2013. License renewal will extend the operating license for each unit an additional 20 years past the above dates. The proposed action would include the continued operation and maintenance of the existing facilities at the SPS site and the transmission corridor that connects the SPS, Units 1 and 2, to the regional electrical grid. The proposed action will not include any new construction or onsite disturbance. The NRC is preparing a supplement to its 1996?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for this proposed license renewal. As part of the renewal review, we evaluate potential impacts to Federally listed, proposed, or candidate species, as well as designated or proposed critical habitat. In a letter to the Virginia Field Office of the U.S. Fish and Wildlife Service (FWS) dated January 24, 2002, the NRC staff requested a list of Federally protected species and any critical

John P. Wolflin; U. S. Fish; Wildlife Service

2002-01-01T23:59:59.000Z

64

Email licensing  

Science Conference Proceedings (OSTI)

We propose a framework, email licensing, that allows email users to determine whose messages and in what content and conditions are authorized to come into their inboxes. The idea is to treat email address as a data owned by the addressee, and any use ... Keywords: Email licensing, Personal data licensing, Spam, Unsolicited emails

Yuh-Jzer Joung; Chu-Jui Yang

2009-05-01T23:59:59.000Z

65

Occupational Risk Consequences of the Department of Energy's Approach to Repository Design, Performance Assessment, and Operation in the Yucca Mountain License Application  

Science Conference Proceedings (OSTI)

EPRI has discovered several aspects of the U.S Department of Energy (DOE) proposed design and operation of the Yucca Mountain repository thatif implemented as described in the license application (LA)could result in unnecessary occupational health and safety risk to workers involved with repository-related activities. This report identifies key DOE conservatisms and focuses on the occupational risk consequences of the DOE's approach to the repository design, performance assessment, and operation.

2008-08-12T23:59:59.000Z

66

Negotiable Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Negotiable Licensing Negotiable Licensing Negotiable Licenses LANL's significant portfolio of intellectual property (patents, copyrights, and trademarks) primarily results from federally-sponsored research and development in support of the Laboratory's national security mission. Also, we collaborate with industry to develop innovative, application-specific technology to further our partner's ultimate commercialization objectives. In each case, we develop valuable technology that provides benefit to both the public and private sectors, the majority of which is available for commercial licensing. To ensure that our partners have the necessary intellectual property advantage to successfully deploy LANL technology, we offer a variety of negotiable commercial license agreements that can be tailored to suit specific market

67

TAO: License  

NLE Websites -- All DOE Office Websites (Extended Search)

Copyright 2013 , UChicago Argonne, LLC Copyright 2013 , UChicago Argonne, LLC Operator of Argonne National Laboratory All rights reserved. Toolkit for Advanced Optimization (TAO), Version 2.2.0 OPEN SOURCE LICENSE Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Software changes, modifications, or derivative works, should be noted with comments and the author and organization's name. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

68

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Halbach Array DC Motor/Generator Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Lawrence Livermore National ...

69

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Cross-Talk Free, Low-Noise Optical Amplifier Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between ...

70

Three essays on licensing university inventions  

E-Print Network (OSTI)

of inventor(s), invention title, disclosure date, patent andphases: Phase 1 - Inventions Disclosure. The invention isDiego regarding the disclosure of inventions and licensing

Munteanu, Radu

2007-01-01T23:59:59.000Z

71

Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT DEPARTMENT-OWNED CONTRACTOR-OPERATED LABORATORIES, DOEIG-0479 Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES...

72

Reference: Additional Plant Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation, Dresden Nuclear Power Station and Quad Cities Nuclear Power Station  

E-Print Network (OSTI)

2000 In the referenced letter, Commonwealth Edison Company, now Exelon Generation Company (EGC), LLC, submitted a request for changes to the operating licenses and Technical Specifications (TS) for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2, to allow operation at uprated power levels. In a telephone conference on August 31, 2001, between representatives of EGC and Mr. L. W. Rossbach and other members of the NRC, the NRC requested additional information regarding these proposed changes. The attachment to this letter provides the requested information. Should you have any questions related to this letter, please contact Mr. Allan R. Haeger

K. A. Ainger

2001-01-01T23:59:59.000Z

73

Transmittal of Additional Information For License  

E-Print Network (OSTI)

By letter dated June 5, 2001 Southern Nuclear Operating Company (SNC) formally transmitted the collected responses to eighteen open items contained in the draft license renewal Safety Evaluation Report to NRC. Since that time additional information has been developed on several open items, and Appendix B, the FSAR Supplement, and various application sections have been revised. This letter formally transmits all additional information related to the Hatch license renewal application and the related open items, and is intended to complete the documentation necessary to allow the open items to be closed by the NRC. If you have any questions concerning this information, please contact this office. Respectfully submitted, HLS/JAM H. L. Sumner, Jr. Enclosures:

Lewis Sumner; Edwin I. Hatch; Nuclear Plant

2001-01-01T23:59:59.000Z

74

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

75

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

76

Licensing NIST Technologies  

Science Conference Proceedings (OSTI)

... Partnerships Office (TPO) works with partners to license NIST patented inventions. Parties interested in licensing an issued patent or patent ...

2013-04-08T23:59:59.000Z

77

Licensing Opportunity Announcements | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Licensing | Licensing Opportunity Announcements SHARE Licensing Opportunity Announcements UT-Battelle, LLC, acting under its Prime Contract No. ORNL Laboratory Director Signs New License Agreement DE-AC05-00OR22725 with the U.S. Department of Energy (DOE) for the management and operation of the Oak Ridge National Laboratory (ORNL), is posting notice of near-term license opportunities for technologies listed on this page and is requesting license applications from potential commercialization partners. ORNL will license these technologies in defined fields of use. License applications will be evaluated based on prospective partners' ability and commitment to successfully commercialize the technology, with a preference for United States-based

78

Licensing - Oak Ridge National Laboratory | ORNL  

Licensing Things You Should Know about Working with ORNL. UT-Battelle manages and operates ORNL under a contract with the U.S. Department of Energy (DOE).

79

Invention to License: The Tech Transfer Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Invention to License: The Tech Transfer Process Speaker(s): Michael Mueller Robin C. Chiang Date: November 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar HostPoint of...

80

Final Safety Evaluation Report to license the construction and operation of a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)  

Science Conference Proceedings (OSTI)

The Final Safety Evaluation Report (FSER) summarizes the US Nuclear Regulatory Commission (NRC) staff`s review of Envirocare of Utah, Inc.`s (Envirocare`s) application for a license to receive, store, and dispose of uranium and thorium byproduct material (as defined in Section 11e.(2) of the Atomic Energy Act of 1954, as amended) at a site near Clive, Utah. Envirocare proposes to dispose of high-volume, low-activity Section 11e.(2) byproduct material in separate earthen disposal cells on a site where the applicant currently disposes of naturally occurring radioactive material (NORM), low-level waste, and mixed waste under license by the Utah Department of Environmental Quality. The NRC staff review of the December 23, 1991, license application, as revised by page changes dated July 2 and August 10, 1992, April 5, 7, and 10, 1993, and May 3, 6, 7, 11, and 21, 1993, has identified open issues in geotechnical engineering, water resources protection, radon attenuation, financial assurance, and radiological safety. The NRC will not issue a license for the proposed action until Envirocare adequately resolves these open issues.

Not Available

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Licensing Instructions  

Operated by Lawrence Livermore National Security, LLC, for the Department of Energy's National Nuclear Security Administration

82

Issue Date: Expiration Date:  

E-Print Network (OSTI)

Discussion: Enclosed for your review and comment are the draft revisions to the FSME Procedure SA-103, Reviewing the Common Indicator, Technical Staffing and Training. SA-103 procedure describes the process and guidelines to be used by IMPEP team members when reviewing the adequacy of an NRC Region or States program for the staffing and training of technical personnel. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Training; Robert J. Lewis; Robert J. Lewis; A. Duncan White

2009-01-01T23:59:59.000Z

83

Yankee nuclear power station license renewal assessment  

Science Conference Proceedings (OSTI)

Nuclear power plants are initially licensed to operate for 40 years. Recent changes to US Nuclear Regulatory Commission regulations allow licenses to be renewed for up to 20 additional years. The new regulations require a comprehensive plant assessment to ensure continued effective aging management of equipment important to license renewal (ILR). Under the industry's lead plant program, Yankee Atomic Electric Company (YAEC) has assisted with development and demonstration of a generic license renewal assessment process. The generic assessment process developed under the lead plant program is the Nuclear Management and Resources Council methodology.

Hinkle, W.D. (Yankee Atomic Electric Co., Bolten, MA (United States))

1992-01-01T23:59:59.000Z

84

Related to the License Renewal  

E-Print Network (OSTI)

requested that the U.S. Nuclear Regulatory Commission (NRC) renew the operating license for Ginna (license number DPR-18) for a period of 20 years beyond the current expiration of midnight, September 18, 2009. The Ginna plant is located in the Town of Ontario, in the northwest corner of Wayne County, New York, on the south shore of Lake Ontario. The NRC issued the construction permit in April 1966, followed by a provisional operating license on September 19, 1969, and a full-term operating license on December 10, 1984. The Ginna unit consists of a Westinghouse pressurized-water reactor with nuclear steam supply systems designed to operate at core power levels up to 1,520 megawatts-thermal, or approximately 490 megawatts-electric. This SER presents the status of the staffs review of information submitted to the NRC through January 9, 2004. In its SER with open items, issued on October 9, 2003, the staff identified open and confirmatory items that required resolution before the staff could make a final determination on the application. These items are summarized in Sections 1.5 and 1.6 of this

R. E. Ginna; Nuclear Power Plant; R. E. Ginna; Nuclear Power Plant

2004-01-01T23:59:59.000Z

85

Wind Power Impacts on Electric Power System Operating Costs: Summary and Perspective on Work to Date; Preprint  

DOE Green Energy (OSTI)

Electric utility system planners and operators are concerned that variations in wind plant output may increase the operating costs of the system. This concern arises because the system must maintain an instantaneous balance between the aggregate demand for electric power and the total power generated by all power plants feeding the system. This is a highly sophisticated task that utility operators and automatic controls perform routinely, based on well-known operating characteristics for conventional power plants and a great deal of experience accumulated over many years. System operators are concerned that variations in wind plant output will force the conventional power plants to provide compensating variations to maintain system balance, thus causing the conventional power plants to deviate from operating points chosen to minimize the total cost of operating the system. The operators' concerns are compounded by the fact that conventional power plants are generally under their control and thus are dispatchable, whereas wind plants are controlled instead by nature. Although these are valid concerns, the key issue is not whether a system with a significant amount of wind capacity can be operated reliably, but rather to what extent the system operating costs are increased by the variability of the wind.

Smith, J. C.; DeMeo, E. A.; Parsons, B.; Milligan, M.

2004-03-01T23:59:59.000Z

86

Solar Heating Contractor Licensing  

Energy.gov (U.S. Department of Energy (DOE))

Michigan offers a solar heating contractor specialty license to individuals who have at least three years of experience installing solar equipment under the direction of a licensed solar contractor...

87

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2  

SciTech Connect

NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

1996-02-01T23:59:59.000Z

88

PCx END USER SOFTWARE LICENSE AGREEMENT  

PCx_lic.web.enduser. doc 7-19-06 1 PCx END USER SOFTWARE LICENSE AGREEMENT This Agreement, is made between the University of Chica go as operator of Argonne National ...

89

NREL: Technology Transfer - Licensing Agreements  

National Renewable Energy Laboratory Technology Transfer Licensing Agreements. Through licensing agreements, NREL provides industry with an opportunity to ...

90

Nuclear reactor characteristics and operational history  

Gasoline and Diesel Fuel Update (EIA)

Nuclear > U.S. reactor operation status tables Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: November 2012 See also: Table 1. Capacity and Generation, Table 2. Ownership Data Table 3. Nuclear Reactor Characteristics and Operational History PDF XLS Plant Name Generator ID Type Reactor Supplier and Model Construction Start Grid Connection Original Expiration Date License Renewal Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1 PWR Babcock&Wilcox, Lower Loop 10/1/1968 8/17/1974 5/20/2014 2/1/2000 6/20/2001 5/20/2034 Arkansas Nuclear One 2 PWR Combustion Eng. 7/1/1971 12/26/1978 7/17/2018 10/15/2003 6/30/2005 7/17/2038

91

Chapter 5, "License Renewal and Aging Management for Continued Service  

SciTech Connect

As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.

Naus, Dan J [ORNL] [ORNL

2013-01-01T23:59:59.000Z

92

NOTICE OF INTENT TO GRANT PARTIALLY EXCLUSIVE LICENSE NATIONAL ...  

Gasification Combined Cycle (IGCC) Operator Training System (OTS) Software. The software license will include source and executable copies of the IGCC Dynamic Model ...

93

LALP-05-111 Licensable Novel Zeolite Synthesis Technologies Method ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary Zeolites and molecular

94

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

Eugene S. Grecheck David P. Batalo

2010-11-30T23:59:59.000Z

95

License Iso. CM35  

Office of Legacy Management (LM)

License Iso. CM35 License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb fual oleroat f*hrlcmtlon. You are nirthcr licensed to transfer aad deliver poaaeeslon of and title to refined ecwce material to any person licensed by the Atcmlc Energy ~~slon, VitAin the limits of his license. i f Am a condition of iemzaace of thie llcenee, you are required to maintain

96

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 4, 2011 January 4, 2011 CX-004858: Categorical Exclusion Determination Facility Conservation Improvement Program Loan CX(s) Applied: A9, A11, B5.1 Date: 01/04/2011 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 4, 2011 CX-004857: Categorical Exclusion Determination Building Operations Certification License CX(s) Applied: A9, A11, B5.1 Date: 01/04/2011 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 4, 2011 CX-004854: Categorical Exclusion Determination Missouri-City-St. Peters CX(s) Applied: A1, A9, B2.5, B5.1 Date: 01/04/2011 Location(s): St. Peters, Missouri Office(s): Energy Efficiency and Renewable Energy January 3, 2011 CX-005094: Categorical Exclusion Determination

97

License Application Guidelines  

market, and describe how the funding will be obtained. LICENSE APPLICATION GUIDELINES 6. ... Key events that have led to your companys current position in the

98

END USER LICENSE  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

99

END USER LICENSE SAC  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

100

Licensing Guidelines | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

parties. Licenses that include the right to sublicense to others also include financial terms for sublicensing revenue that is based on the commercialization of the technology by a...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Licensing Berkeley Lab Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

to inquire. For more information on licensing, please see Frequently Asked Questions . Contact Us Receive Customized Tech Alerts Tech Transfer Site Map Last updated: 09172009...

102

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

Mark Holbrook

2010-09-01T23:59:59.000Z

103

Received Date:  

E-Print Network (OSTI)

As a student at Ramapo College of New Jersey in the environmental program, I have been evaluating the DSEIS for the re-licensing of Indian Point. When the EIS was generated in the late 1990s to begin the re-licensing process for Indian Point 2 and 3, there was no evaluation included in the document on the visual impacts the facility posed to the surrounding view shed. This includes the construction of the proposed cooling tower. The Indian Point facility is visible from several different elevations and vantage points along the Hudson River Valley, posing different impacts to the communities of varying income and minority populations surrounding Indian Point. In 1975 a study was done by Grant R. Jones evaluating the visual impacts of various cooling tower options at Indian Point Nuclear Facility. This study looked at the visual impacts from the proposed cooling tower, including the height of the concrete structure and varying size and thickness of the moisture plume produced. Both of these elements can be impacted with changes in weather and wind patterns. The study concluded that the construction of a cooling tower at Indian Point would have an even greater adverse affect on the view shed than the facility itself already posses (Jones, Ady & Gray, 1979). The mayor of the Village of Buchanan also expressed his

Andrew Stuyvenberg; Post Office

2009-01-01T23:59:59.000Z

104

Licensable Life Science Technologies | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensable Life Science Technologies A selection of biology-based technologies available for licensing licensablebiologicaltechnologies...

105

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1  

Science Conference Proceedings (OSTI)

NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

NONE

1996-02-01T23:59:59.000Z

106

Calvert Cliffs License Renewal Aging Management Review Reports  

Science Conference Proceedings (OSTI)

This report and associated CD-ROM documents the Calvert Cliffs License Renewal Aging Management Review Reports as of December 1998. The option to operate a nuclear power plant beyond its initial license term of 40 years is an important factor in financial decisions and long-term planning for utility asset management and capital improvement. This report provides other utilities with details of the technical evaluations to support their own preparation of a License Renewal Application (LRA).

1999-06-23T23:59:59.000Z

107

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

108

Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance  

Science Conference Proceedings (OSTI)

Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

R. Fink, D. Hill, J. O'Hara

2004-11-30T23:59:59.000Z

109

Public comments on the proposed 10 CFR Part 51 rule for renewal of nuclear power plant operating licenses and supporting documents: Review of concerns and NRC staff response. Volume 1  

SciTech Connect

This report documents the Nuclear Regulatory Commission (NRC) staff review of public comments provided in response to the NRC`s proposed amendments to 10 Code of Federal Regulations (CFR) Part 51, which establish new requirements for the environmental review of applications for the renewal of operating licenses of nuclear power plants. The public comments include those submitted in writing, as well as those provided at public meetings that were held with other Federal agencies, State agencies, nuclear industry representatives, public interest groups, and the general public. This report also contains the NRC staff response to the various concerns raised, and highlights the changes made to the final rule and the supporting documents in response to these concerns.

NONE

1996-05-01T23:59:59.000Z

110

Statement by Deputy Secretary of Energy Clay Sell on NRG's License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by Deputy Secretary of Energy Clay Sell on NRG's by Deputy Secretary of Energy Clay Sell on NRG's License Application Statement by Deputy Secretary of Energy Clay Sell on NRG's License Application September 25, 2007 - 2:49pm Addthis "Today marks the most significant and tangible step to date, towards the construction of the first new nuclear power plant in the United States in over 30 years. DOE is confident that with NRG's reactor design selection and cooperation with their partners, General Electric and Toshiba, this project will likely result in the first of many new reactors being constructed and operated in the U.S. This reactor would join an American nuclear industry that is safe, secure and has a strong record to prove it. We look forward to the continued cooperation with industrial partners and

111

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

112

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

113

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

114

PNNL: Technology Transfer - Our Licensing Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Licensing Guidelines PNNL approaches licensing in a flexible, collaborative manner Although every technology license is unique, at PNNL we recognize that there are basic...

115

Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification: Guidelines for Planning, Specifi cation, Design, Licensing, Implementation, Training, Operation, and Maintenance  

Science Conference Proceedings (OSTI)

Operators of nuclear power plants face a significant challenge designing and modifying control rooms that will be produced at various stages of instrumentation and control modernization. This report provides guidance on planning, specifying, designing, implementing, operating, maintaining, and training for modernized control rooms and digital human-system interfaces. Much of the guidance also will support new plant control rooms. This report also presents detailed information and guidelines on specific t...

2004-11-29T23:59:59.000Z

116

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

117

Argonne TDC: Licensing Intellectual Property from Argonne ...  

Licensing Intellectual Property from Argonne National Laboratory. Argonne's licensing program provides companies with opportunities to acquire rights in Argonne ...

118

Date Published  

E-Print Network (OSTI)

Abstract: The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP is integrated with the Baseline Case operating scenario documented in ORP-11242 (Rev. 6), River Protection Project System Plan. Volume 1 Process Strategy (RPP-40149-VOL1) provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 Campaign Plan (RPP-40149-VOL2) describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 Project Plan (RPP-40149-VOL3) identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. Issues or project-specific risks, potential mitigating actions, and future refinements are also identified in each volume of the IWFDP.

E. B. West; P. J. Certa; T. M. Hohl; J. S. Ritari; B. R. Thompson; C. C. Haass; Key Words; P. J. Certa; T. M. Hohl; J. S. Ritari; B. R. Thompson; C. C. Haass

2012-01-01T23:59:59.000Z

119

Summary of Utility License Termination Documents and Lessons Learned: Summary of License Termination Plan Submittals by Three Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission's (NRC's) 1996 revised decommissioning regulations specify that the operator of a nuclear plant must submit a "License Termination Plan" (LTP) two years prior to termination of the plant license. The LTP explicitly defines the elements that the plant operator must address in the decommissioning plan. This report focuses on the approaches and experience gained by three of the leading plants in the preparation and submittal of their LTP submittals under the 1996 regul...

2002-10-28T23:59:59.000Z

120

NREL: Technology Transfer - Licensing Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Agreements Licensing Agreements Through licensing agreements, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Process The licensing agreement process basically includes seven steps. See the NREL Licensing Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through direct communications to create understanding and agree on actions. 1. Identify and Qualify Opportunity To identify an opportunity, a company can browse the technologies available for licensing. When an opportunity has been identified, NREL then asks the company to

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

LA-UR-08-0123a Licensable Explosives Ordnance Disposal Using ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary:

122

LALP-08-045 Licensable Lead-Free Super-Thermite Electric Matches  

Licensable Technologies Lead-Free Super-Thermite Electric Matches An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA

123

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

124

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Program Info State Florida Program Type Solar/Wind Contractor Licensing Provider Florida Solar Energy Industries Association Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued since that time, although people holding these licenses may renew them. The new solar contractor license defines a broader scope of work. With the new license, solar contractors have the authority to install, maintain and

125

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Swimming Pool Heaters Water Heating Program Info State California Program Type Solar/Wind Contractor Licensing Provider California Contractors State License Board The California Contractors State License Board administers contractor licenses. The C-46 Solar Contractor license covers active solar water and space heating systems, solar pool heating systems, and photovoltaic systems. C-46 requirements include four years of experience and passing the business and law exam and the trade exam. Independent license schools offer courses to prepare for license exams.

126

License Renewal Application PREFACE  

E-Print Network (OSTI)

The following describes the information location, layout, and editorial conventions in the Beaver Valley Power Station (BVPS) License Renewal Application (hereinafter referred to as this application or the application). Abbreviated names and acronyms used throughout the application are defined at the end of this preface. Commonly understood terms (such as U.S.) and terms used only in referenced document numbers may not be identified in this table. Regulatory documents such as NUREG-1801, Generic Aging Lessons Learned (GALL) Report,

Beaver Valley; Power Station

2007-01-01T23:59:59.000Z

127

TO :Lyall E. Johnson, Chief Licensing Branch  

Office of Legacy Management (LM)

Lyall E. Johnson, Chief Lyall E. Johnson, Chief Licensing Branch ,,,_ i-.. FROM :Clifford K. Beck, Chief q q+. ., ,,/,j !i-/ I, v' Hazards Evaluation Branch ,: s~~p:~LLItma0~7c ~HEI-IICAL wows We have reviewed the letter of December 10, 1958, from Mallinckrodt Chemical Works, requesting amendment of License No. SNM-33 to permit pelleting operations on uranium enriched to 5% U-235 in a new facility at Hematite, Missouri. Batch sizes throughout the operations will not exceed limited safe masses as specified in Report K-1019, Part 4 (Deleted). Neither the diameter nor capacity of the storage hopper located above the feed hopper of the pelleting press is given. Either the diameter should be not over the limited safe dimension or positive means should be in effect to insure against more than a limited safe m&s in the

128

Technology Licensing Contacts | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

(865) 574-1051 Biography Robert Scott Administrative Assistant scottre@ornl.gov (865) 241-2356 Jennifer Caldwell Technology Licensing, Group Leader caldwelljt@ornl.gov (865)...

129

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Updates available at: http://www.nuclear.gov NEXT UPDATE - October 2012 Page 1 News Updates  The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months.  The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to

130

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

fuel. The EIS and rule are to be completed within 24 months. Due to low natural gas prices and unfavorable economic conditions, Exelon has withdrawn its application for...

131

REVIEWS FOR IN SITU LEACH URANIUM EXTRACTION LICENSE APPLICATIONS  

E-Print Network (OSTI)

Review Plan (NUREG1569) which provides guidance for staff reviews of applications to develop and operate uranium in situ leach facilities. Under the provisions of Title 10 of the Code of Federal Regulations, Part 40 (10 CFR Part 40), Domestic Licensing of Source Material, an NRC Materials License is required to conduct uranium recovery by in situ leach extraction techniques. Applicants for a new license and operators seeking an amendment or renewal of an existing license are required to provided detailed information on the facilities, equipment, and procedures used in the proposed activities. In addition, the applicant for a new license also provides an Environmental Report that discusses the effects of proposed operations on the health and safety of the public and assesses impacts to the environment. For amendment or renewal of an existing license, the original Environmental Report is supplemented, as necessary. This information is used by the NRC staff to determine whether the proposed activities will be protective of public health and safety and the environment and to fulfill NRC responsibilities under the National Environmental Policy Act (NEPA). The purpose of the Standard Review Plan (NUREG1569) is to provide the NRC staff with guidance on performing reviews of information provided by the applicant, and to ensure a consistent quality and

In Situ; Leach Uranium; In Situ; Leach Uranium; J. Lusher

2003-01-01T23:59:59.000Z

132

BUDGET KEY DATES  

Science Conference Proceedings (OSTI)

BUDGET KEY DATES. For Immediate Release: December 15, 2009. Contact: Diane Belford 301-975-8400. Budget Key Dates.

2013-06-16T23:59:59.000Z

133

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

134

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

135

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

136

Renewable Energy Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Renewable Energy Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Home Weatherization Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Oregon Program Type Solar/Wind Contractor Licensing Provider Department of Consumer and Business Services Oregon requires trade licenses for people installing solar energy equipment, and contractor licenses for the companies that do construction. Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of making plumbing

137

Technologies Available for Licensing | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies SHARE Available Technologies One of the primary missions of the Technology Transfer Division is to move our intellectual property from the research facility to the commercial

138

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Nevada Program Type Solar/Wind Contractor Licensing Provider Nevada State Contractors Board - Reno Nevada law requires that solar energy system installers be licensed by the Nevada State Contractors Board. Contractors may be licensed under License Classification C-37 (solar contracting for solar water heating and space heating and air conditioning). Contractors may also perform solar work under License Classification C-1* (plumbing and heating), sub-classification (d) for solar water heating installations, or

139

Property:FERC License | Open Energy Information  

Open Energy Info (EERE)

License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

140

DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT This Agreement ...  

Daness Developers Web License,.Version, 4.5, Sept. 2009 1 DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne ...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

general plumbing contractors carrying an S210 license are authorized to install solar thermal systems. The Division has also established solar-specific license classifications....

142

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; Ready-to-Sign Licenses; DOE SBIR TTI; Government Use Notices; News; Contact Us; Technology Summary

143

NREL: Technology Transfer - Nonexclusive and Exclusive Licenses  

Nonexclusive and Exclusive Licenses. NREL's technology licensing agreements with companies are either nonexclusive or exclusive depending on their field of use.

144

Featured Licensing Professional - Energy Innovation Portal  

Eric Payne. Meet Eric Payne! Eric is the Senior Licensing Executive at the National Renewable Energy Laboratory and one of the licensing contacts on the Energy ...

145

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Eligibility InstallerContractor Savings For Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling...

146

Photovoltaics at DOE's National Renewable Energy Laboratory License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

147

Photovoltaics at DOE's National Renewable Energy Laboratory License  

NLE Websites -- All DOE Office Websites (Extended Search)

ROOF-TOP LICENSE AGREEMENT KEY TERMS ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

148

How to License Technologies | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | How To License ORNL Technologies SHARE How To License ORNL Technologies Technology Evaluation The first step in the licensing process is for you to identify technologies of interest to you. As a starting point, you may wish to browse the available technologies or search using keywords and the ORNL InSpire Technology Search Engine. At any point in your search, please feel free to contact the commercialization manager identified for each technology or

149

Alternative Fuels Data Center: Ethanol License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol License to Ethanol License to someone by E-mail Share Alternative Fuels Data Center: Ethanol License on Facebook Tweet about Alternative Fuels Data Center: Ethanol License on Twitter Bookmark Alternative Fuels Data Center: Ethanol License on Google Bookmark Alternative Fuels Data Center: Ethanol License on Delicious Rank Alternative Fuels Data Center: Ethanol License on Digg Find More places to share Alternative Fuels Data Center: Ethanol License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol License Anyone who imports, exports, or supplies ethanol in the state of Wyoming must obtain an annual license from the Wyoming Department of Transportation. The fee for each license is $25. (Reference Wyoming

150

Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992  

SciTech Connect

In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

Not Available

1993-09-01T23:59:59.000Z

151

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

152

Exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

5.20.2011 UU.S. DEPARTMENT OF ENERGY UNATIONAL ENERGY TECHNOLOGY LABORATORY UEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

153

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Portland) CX(s) Applied: A9 Date: 03012010 Location(s):...

154

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Los Angeles) CX(s) Applied: A9 Date: 03012010 Location(s):...

155

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Arizona Program Type Solar/Wind Contractor Licensing Provider Registrar of Contractors The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's C-11/L-11 electrical license covers solar electric installations. C-11 licenses are required for electrical work on residential property and L-11 licenses apply to commercial installations. Contractors can also acquire a K-11 license to work on both residential and commercial installations. The Arizona Registrar of Contractors does have a specific plumbing license

156

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

157

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

158

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

159

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

160

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Any person acting as an alternative fuels dealer must hold a valid alternative fuel license and certificate from the Wisconsin Department of Administration. Except for alternative fuels that a dealer delivers into a

162

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, ... Keywords: acoustic vehicle classification, license plate detection, seismic, wireless sensor networks

Jan Frigo; Vinod Kulathumani; Sean Brennan; Ed Rosten; Eric Raby

2009-06-01T23:59:59.000Z

163

U.S. Material Licenses  

E-Print Network (OSTI)

There are approximately 22,400 licenses issued for medical, academic, industrial, and general uses of radioactive materials in the United States. The United States Nuclear Regulatory Commission (NRC) and State radiation safety regulatory programs are responsible for ensuring protection of public health and safety and the environment. Currently, there are approximately 3,450 licenses issued by the NRC and 18,950 licenses issued by the 36 Agreement States. An Agreement State is any state with which the Atomic Energy Commission or the Nuclear Regulatory Commission has entered into an Agreement under subsection 274b of the Atomic Energy Act of 1954 (as amended). Definition of the National Materials Program The National Materials Program (NMP) is a term that has been used for many years, to define the broad collective framework within which both NRC and the Agreement States function in carrying out their respective radiation safety regulatory programs. This framework also includes

unknown authors

2009-01-01T23:59:59.000Z

165

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective  

SciTech Connect

Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs) that were well below the NRC DCGL screening values. This contributed to a longer than anticipated period to obtain NRC approval of the Maine Yankee License Termination Plan (LTP). By employing the lessons learned from its first LTP submittal, which was not accepted by the NRC staff, Trojan was able to obtain approval of its revised LTP promptly. While both licensees provided final status survey reports (FSSRs) for NRC approval, the Trojan approach to decommissioning and data management allowed NRC to efficiently review FSS records and supporting documentation. Therefore, NRC was able to review Trojan's FSSR more efficiently than Maine Yankee's FSSR. This paper describes the regulatory impacts of the two different approaches to the decommissioning, the development of licensee required plans, decommissioning operations and records, the differences in licensing processes, and the lessons learned for improving the processes. (authors)

Watson, B.A.; Buckley, J.T.; Craig, C.M. [U.S. Nuclear Regulatory Commission, Office of Nuclear Materials Safety and Safeguards, Decommissioning Directorate (T7E18), Washington, D.C. 20555 (United States)

2006-07-01T23:59:59.000Z

166

NREL: Technology Transfer - Technologies Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Available for Licensing Technologies Available for Licensing Photo of NREL scientist in the NREL Hydrogen Lab. NREL's scientists and engineers develop award-winning technologies available for licensing. NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing. We have many licensing opportunities for NREL-developed technologies, including our featured LED technologies. To see all our technologies available for licensing, visit the EERE Innovation Portal and search for NREL. Learn about our licensing agreement process. Contact For more information about licensing NREL-developed technologies, contact Eric Payne, 303-275-3166. Ombuds NREL strives to quickly resolve any issue or concern you may have regarding

167

Sandia National Laboratories : Licensing/Technology Transfer ...  

Ready-to-Sign licenses require that R & D and substantial manufacture of the licensed product occur within the U.S. to provide benefit to the U.S. economy.

168

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Alternative fuel providers, bulk users, and retailers, or any person who fuels an alternative fuel vehicle from a private source that does not pay

169

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

170

Guide to Microsoft Volume Licensing June 2013 i  

E-Print Network (OSTI)

Guide to Microsoft Volume Licensing June 2013 i Guide to Microsoft Volume Licensing #12;Guide to Microsoft Volume Licensing June 2013 ii Table of Contents Chapter 1: Introduction to Microsoft Volume................................................................................................................................................................ 1 Keys to Understanding Microsoft Volume Licensing

Narasayya, Vivek

171

Vehicles and Fuels Technologies Available for Licensing ...  

Vehicles and Fuels Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

172

Advanced Materials Technologies Available for Licensing ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

173

Solar Thermal Technologies Available for Licensing ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

174

Sandia National Laboratories Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; Sandia National Laboratories Technologies Available for Licensing

175

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; ... National Defense and Security; Molecular Spectroscopy; Imaging Array; Medical Imaging; Remote ...

176

Energy Storage Technologies Available for Licensing ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage ...

177

Industrial Technologies Available for Licensing - Energy ...  

Industrial Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have technologies ...

178

Biomass and Biofuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Biomass and Biofuels Technologies Available for Licensing - Energy Innovation ...

179

Solar Photovoltaic Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Solar Photovoltaic Technologies Available for Licensing - Energy Innovation Portalto ...

180

Geothermal Technologies Available for Licensing - Energy ...  

Geothermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating institutions research and develop ...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Ames Laboratory Technologies Available for Licensing - Energy ...  

Bookmark Ames Laboratory Technologies Available for Licensing - Energy Innovation Portal on Google; Bookmark Ames Laboratory Technologies Available ...

182

Sandia National Laboratories : Licensing/Technology Transfer  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; Licensing and Technology Transfer. IP Home; Search ...

183

Windows Server 2008 R2 Licensing Guide  

E-Print Network (OSTI)

Windows Server 2008 R2 Licensing Guide m Your Comprehensive Resource for Licensing and Pricing #12;2 Table of Contents Summary 3 Table of Windows Server 2008 R2 Core Product Offerings 3 License Terms ­ Windows Server 2008 R2 Product Line Updates 4 Edition Comparison by Server Role 5 New and Updated Features

Narasayya, Vivek

184

Review of export license applications (Strategic Trade Control...  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Nonproliferation & National Security (NPNS) Overview Technical Nonproliferation Policy Support Strategic Trade Control Review of export license applications Multilateral...

185

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Success Stories Success Stories Commercialization and Licensing Economic Development Industrial Partnerships Sponsored Research Partnerships Home | Connect with ORNL | For Industry | Partnerships | Success Stories | Commercialization and Licensing Success Stories Commercialization and Licensing 1-10 of 14 Results Prev 12 Next DNP Green Technology, Inc. Exclusively Licenses Patents Invented at Argonne National Laboratory and Oak Ridge National Laboratory March 09, 2010 - On March 9, 2010, UT-Battelle, LLC, UChicago Argonne, LLC, and DNP Green Technology, INC fully executed an exclusive license agreement for patents invented solely by Argonne National Laboratory and jointly by Oak Ridge National Laboratory (ORNL) and Argonne National Laboratory (ANL). GE-Reuter Stokes to Market SNS-Designed Electronics

188

Clean Fractionation: Technology Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Fractionation Clean Fractionation National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Offi ce of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. NREL/FS-7A1-43959 * October 2008 Printed with a renewable-source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. You'll find more technologies available for licensing on the NREL Technology Transfer Web site at www.nrel.gov/technologytransfer/. National Renewable Energy Laboratory Innovation for Our Energy Future Biorefinery production costs are driven Insolubles Wash Cellulose pulp Lignocellulosic feedstock Solubles

189

License Transfer For The Proposed Merger Qf Duke Energy Corporation And Progress Energy  

E-Print Network (OSTI)

(ML11110A031)) 2. NRC e-mail from Brenda L. Mozafari titled, CPL and FPL Indirect License Transfer (TAC No. ME5970), dated July 22, 2011 3. Progress Energy letter from James Scarola to the NRC Document Control Desk titled, Response

Docket No

2011-01-01T23:59:59.000Z

190

Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6  

SciTech Connect

In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

NONE

1995-08-01T23:59:59.000Z

191

For The Calvert Cliffs Combined License Application  

E-Print Network (OSTI)

The purpose of this letter is to respond to the requests for additional information (RAIs) identified in the NRC letter to UniStar dated February 3, 2009 (Reference 1). The RAIs address figures needed to publish the environmental impact statement (EIS) and information necessary for completion of regulatory reviews. UniStar Regulatory Affairs staff, UniStar vendors for the Calvert Cliffs Nuclear Power Plant Unit 3 (CCNPP3) project, NRC headquarters staff, and NRC contractors supporting review of the CCNPP3 Combined License Application (COLA) environmental report discussed the scope of the RAIs (Reference 1) during four telephone conferences on February 13, 18, 19, and 24. The discussions focused on how UniStar can provide the NRC with graphics needed to develop the CCNPP3 Draft EIS and necessary additional details of environmental reviews performed by UniStar. The telephone conferences resulted in a common understanding of the NRC requests and how UniStar can provide the needed information (Reference 2).UN#09-1140 Page 2 of 2 The NRC staff agreed that certain information regarding alternate sites is available in the

unknown authors

2009-01-01T23:59:59.000Z

192

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT  

E-Print Network (OSTI)

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT _________________________________________________________ Applicants for positions involving the operation of a commercial motor vehicle must comply with Title 49 CFR: _______________ Please list the following information for each unexpired commercial motor vehicle operator license

Roy, Subrata

193

License integration patterns: Addressing license mismatches in component-based development  

Science Conference Proceedings (OSTI)

In this paper we address the problem of combining software components with different and possibly incompatible legal licenses to create a software application that does not violate any of these licenses while potentially having its own. We call this ...

Daniel M. German; Ahmed E. Hassan

2009-05-01T23:59:59.000Z

194

Vehicles and Fuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Vehicles and Fuels Technologies Available for Licensing - Energy Innovation Portalto ...

195

Wind Energy Technologies Available for Licensing - Energy ...  

Wind Energy Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have wind energy ...

196

University of Colorado Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; University of Colorado Technologies Available for Licensing The University of Colorado ...

197

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

United States Department of Energy (DOE) Contract No. DE-AC52-07NA27344 to manage ... Sale, or import of the Licensed Products, performance of ...

198

Solar Thermal Technologies Available for Licensing - Energy ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have concentrating solar power ...

199

Overview of the Yucca Mountain Licensing Process  

SciTech Connect

This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process.

M. Wisenburg

2004-05-03T23:59:59.000Z

200

Sandia National Laboratories : Licensing/Technology Transfer ...  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; IP Management, Alliances & Licensing Contacts. IP Home; Search/Browse ...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

NREL: Technology Transfer - Technologies Available for Licensing  

NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing.

202

Wind Energy Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Wind Energy Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

203

Energy Storage Technologies Available for Licensing - Energy ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage technologies ...

204

Startup America Technologies Available for Licensing - Energy ...  

Startup America Technologies Available for Licensing Startup America is a White House initiative to celebrate, inspire, and accelerate high-growth ...

205

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Exclusive Patent License for ORNL Graphite Foam Technology January 28, 2010 - Light-emitting diode (LED) lamps are increasingly in demand in industrial and commercial...

206

Non-exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

207

Exclusive Patent License Agreement between Alliance and ...  

In such event, Alliance shall be free to license such rights to third parties without further obligation to Licensee. 8.5 Alliance agrees, ...

208

Advanced Materials Technologies Available for Licensing - Energy ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have advanced materials ...

209

Geothermal Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Geothermal Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

210

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

211

Nondestructive Evaluation: Update on License Renewal One Time Inspection and Best NDE Practices  

Science Conference Proceedings (OSTI)

As nuclear plants enter long-term operations beyond 40 years with extended licenses, nondestructive evaluation (NDE) becomes increasingly important. This is especially true for plants that are going through the license renewal process. Many of the commitments made by more than 100 plants have submitted applications that include identification of systems, structures, and components for one-time inspection (OTI) based on suitable NDE techniques. This report provides an example of such inspection and the as...

2011-11-02T23:59:59.000Z

212

License  

E-Print Network (OSTI)

This report documents the program and the outcomes of Dagstuhl Seminar 11181 Organic Computing Design of Self-Organizing Systems.

Kirstie Bellman; Andreas Herkersdorf; Michael G. Hinchey; Tu Mnchen De; Andreas Herkersdorf; Mike Hinchey; Christian Mller-schloer; Hartmut Schmeck; Rolf Wrtz; Kirstie Bellman; Andreas Herkersdorf; Mike Hinchey; Christian Mller-schloer; Hartmut Schmeck; Rolf Wrtz

2011-01-01T23:59:59.000Z

213

License  

E-Print Network (OSTI)

EWF is short for Expert Witness Compression Format, according to [ASR02]. It is a file type used to store media images for forensic purposes. It is currently widely used in the field of computer forensics in proprietary tooling like EnCase en FTK. The original specification of the format is provided by ASRDATA, for the SMART application. This document is intended as a working document for the EWF specification. Which should allow existing Open Source forensic tooling to be able to process this file type. page iDocument information Author(s):

Joachim Metz; Joachim Metz

2006-01-01T23:59:59.000Z

214

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

215

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

216

RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION OF URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

radiological criteria for building surfaces and radionuclides other than radium in soil, for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-98-084, dated August 11, 1998 (Attachment 1), the Commission indicated that it did not object to the staff's recommendation to use the radium benchmark dose in developing a final rule applicable to uranium recovery licensees. The final rule addresses radiological criteria for decommissioning land and buildings required for license termination for uranium recovery facilities, e.g., uranium mills and in situ leach facilities (ISLs). The final rule will provide a clear and consistent regulatory basis for determining the extent to which lands and structures can be considered to be decommissioned. BACKGROUND: On August 22, 1994 (59 FR 43200), the U.S. Nuclear Regulatory Commission (NRC) published a proposed rule for comment in the Federal Register, to amend 10 CFR Part 20, "Standards for Protection Against Radiation, " to include radiological criteria for decommissioning as subpart E. The proposed rule applied to uranium mill facilities and other NRC licensees, but did not apply to mill tailings disposal or to soil radium cleanup at mills because the radiological criteria for these activities are regulated under 10 CFR Part 40, Appendix A. Some commenters recommended that the rule exempt conventional thorium and uranium mill facilities and ISLs. In SECY-97-046A, dated March 28, 1997, entitled "Final Rule on Radiological Criteria for License Termination, " the staff recommended that the final rule indicate that for uranium and thorium mill facilities the cleanup of radionuclides other than radium from soil and buildings must result in a dose no greater than the dose resulting from the cleanup of radium-contaminated soil (benchmark

William D. Travers /s

1999-01-01T23:59:59.000Z

217

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

218

Date: _______________ Vendor Name: _______________________________  

E-Print Network (OSTI)

: ________________________ City, State, Zip:_______________________ Phone # : __________________ Fax, Nuclear Magnetic Resonance e. ___ Fire Safety-Extinguishing Systems, Bldg. Security Alarm Systems on ReX Released Re-released Faxed to Purchasing Date Initials 6-15-11 REV 0.00 0.00 0.00 0.00 0.00 0

Fabrikant, Sara Irina

219

Technologies licensed | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies licensed Technologies licensed Technologies licensed Posted: July 16, 2012 - 3:49pm | Y-12 Report | Volume 9, Issue 1 | 2012 Rendering of Y-12's Access Rate Control System Wherever threatening situations arise, in-place security measures make the most of every second. On Feb. 8, a startup firm in Knoxville, Tenn., licensed two security-related technologies from the Y-12 National Security Complex that do just that. The technologies, which delay entrance to controlled-access areas, provide a security solution for various potential markets: commercial nuclear facilities, pharmaceutical manufacturers, correctional facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate

220

Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Liquefied Petroleum Liquefied Petroleum Gas (Propane) License to someone by E-mail Share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Facebook Tweet about Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Twitter Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Google Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Delicious Rank Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Digg Find More places to share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Liquefied Petroleum Gas (Propane) License

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Solar/Wind Contractor Licensing | Open Energy Information  

Open Energy Info (EERE)

Solar/Wind Contractor Licensing Solar/Wind Contractor Licensing < Solar Jump to: navigation, search Some states have established a licensing process for solar-energy contractors and/or wind-energy contractors. These requirements are designed to ensure that contractors have the necessary knowledge and experience to install systems properly. Solar licenses typically take the form of either a separate, specialized solar contractor's license, or a specialty classification under a general electrical or plumbing license. [1] Solar/Wind Contractor Licensing Incentives CSV (rows 1 - 24) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Alternative Energy System Contracting (Virginia) Solar/Wind Contractor Licensing Virginia Installer/Contractor Photovoltaics No

222

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heating Program Information Louisiana Program Type SolarWind Contractor Licensing All solar and wind energy installations must be performed by a contractor duly licensed by and...

223

LAWRENCE LIVERMORE NATIONAL LABORATORY OVERVIEW OF LLNL LICENSE ...  

one or more fields of use. ... c. Security and energy conservation; d. ... Number of Licenses Total Cost for All Licenses 1 $100,000

224

Ready-to-Sign Licensing Instructions - Industrial Partnerships ...  

Ready-to-Sign Licensing Instructions. Read the Notice for RTS License Agreement and complete Commercialization Information Form; Select a technology from the patents ...

225

Argonne TDC: Licensing Intellectual Property from Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Property from Argonne National Laboratory Argonne's licensing program provides companies with opportunities to acquire rights in Argonne inventions and copyrights. Licenses...

226

Release Date: August 2010 Next Release Date: August 2011  

U.S. Energy Information Administration (EIA)

Release Date: August 2010 Next Release Date: August 2011 U.S. Energy Information Administration/Renewable Energy Annual 2008 Table 1.14 Total Biomass Electricity Net ...

227

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

228

MEtlORANDUM DATE  

Office of Legacy Management (LM)

---B-B TYPE OF OPERATION we s- --- Research & Development E Facility Type 0 Production scale testing 0 Pilot Scale ti Bench Seal e Process 0 Theoretical...

229

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

requiring or involving responsibility for work or operations at DOENNSA sites or facilities that support or perform essential functionsactivities'that directly support...

230

Technology Transfer: Success Stories: Licensed Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensed Technologies Licensed Technologies Here are some of our licensees and the technologies they are commercializing; see our Start-Up Company page for more of our technology licenses. Company (Licensee) Technology Life Technologies Corp. Cell lines for breast cancer research Bristol Myers Squibb; Novartis; Plexxikon Inc.; Wyeth Research; GlaxoSmithKline; Johnson & Johnson; Boehringer Ingelheim Pharmaceuticals, Inc.; Genzyme Software for automated macromolecular crystallography Shell International Exploration and Production; ConnocoPhillips Company; StatOil ASA; Schlumburger Technology Corportation; BHP Billiton Ltd.; Chevron Energy Technology Company; EniTecnologie S.p.A. Geo-Hydrophysical modeling software Microsoft Home Energy Saver software distribution Kalinex Colorimetric bioassay

231

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

Not Available

1991-04-01T23:59:59.000Z

232

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

233

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

234

Monticello Lead Plant License Renewal Project Summary Report  

Science Conference Proceedings (OSTI)

This report summarizes license renewal evaluation activities from the Monticello Lead Plant License Renewal Project (MLP Project) that were conducted between October 1988 and December 1992. The lessons learned during this first plant-specific license renewal evaluation provide valuable information that utilities can use when initiating a license renewal effort.

1996-10-06T23:59:59.000Z

235

File:03MTDLandUseLicenseProcess (1).pdf | Open Energy Information  

Open Energy Info (EERE)

MTDLandUseLicenseProcess (1).pdf MTDLandUseLicenseProcess (1).pdf Jump to: navigation, search File File history File usage File:03MTDLandUseLicenseProcess (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:05, 1 October 2012 Thumbnail for version as of 12:05, 1 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-MT-d - Land Use License Process

236

Argument licensing and agreement in Zulu  

E-Print Network (OSTI)

In this thesis, I examine some core grammatical phenomena - case licensing, agreement, the EPP - through the lens of the Bantu language Zulu. Zulu has a number of remarkable and puzzling properties whose analysis affords ...

Halpert, Claire

2012-01-01T23:59:59.000Z

237

Technologies Recently Available for Licensing - 1999  

DOE Green Energy (OSTI)

An NREL Technology Transfer fact sheet describing four technologies that are available for licensing: steel weld weakness detection, cadmium telluride solar cell enhancement, HOMER model for choosing optimal electrical systems for remote areas, and inner-flame matrix burner.

Brown, H.; Touryan, K.

1999-09-07T23:59:59.000Z

238

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

TYPE OF OPERATION ------ Research & Development .m vale Qppl p 4' q Facility Type 0 Hlemll stii es 0 Production eta e testing L-h Ico*vl 0 Pilot Scale' q...

239

Alternative Fuels Data Center: Biodiesel Distributor License and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Distributor Distributor License and Recordkeeping Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on AddThis.com... More in this section...

240

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hot Water Contractor Licensing Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Arkansas Program Type Solar/Wind Contractor Licensing Arkansas offers several limited, specialty licenses for solar thermal installers under the general plumbing license. There are three specialty classifications available for solar thermal installers: a Restricted Solar Mechanic license, a Supervising Solar Mechanic license, and a Solar Mechanic Trainee classification. Installers with a Restricted Solar Mechanic license can install and maintain systems used to heat domestic hot water, but are not allowed to perform any other plumbing work. Individuals holding a Supervising Solar Mechanic license are able to supervise, install

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

242

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

243

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

244

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

245

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

246

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

247

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

248

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

249

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

250

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

251

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

252

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

253

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

254

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

255

The Brazilian Audit Tribunal's role in improving the federal environmental licensing process  

SciTech Connect

This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

Lima, Luiz Henrique, E-mail: luizhlima@terra.com.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Magrini, Alessandra, E-mail: ale@ppe.ufrj.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Centro de Tecnologia - Bloco C Sala 211, Ilha do Fundao, 21949-900 - Rio de Janeiro, Caixa-Postal: 68565, RJ (Brazil)

2010-02-15T23:59:59.000Z

256

Nuclear Power Plant License Renewal Environmental Life Cycle Management Plan Manual: License Renewal Environmental Compliance  

Science Conference Proceedings (OSTI)

This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant's day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement.

1995-06-01T23:59:59.000Z

257

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 28,2008 November 28,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is a copy of DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card. It has been revised to reflect our new contract with the JPMorgan Chase Bank. This Flash and its attachment will be posted online, at the following website: http://www.mana~ement.energy.~~~/u~li~~ ~uidance/~olicy flashes.htm. Questions concerning this policy flash should be directed to Denise Clark at (202) 287-1748 or DeniseT.Clarke@hq.doe.nov .

258

T-564: Vulnerabilities in Citrix Licensing administration components |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Vulnerabilities in Citrix Licensing administration 4: Vulnerabilities in Citrix Licensing administration components T-564: Vulnerabilities in Citrix Licensing administration components February 24, 2011 - 7:00am Addthis PROBLEM: Vulnerabilities in Citrix Licensing administration components. PLATFORM: Citrix Licensing Administration Console, formerly known as the License Management Console. ABSTRACT: The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console. reference LINKS: Citrix ID:CTX128167 SecurityTracker Alert ID:1025123 Citrix Support IMPACT ASSESSMENT: Medium Discussion: Citrix has been made aware of a number of vulnerabilities in a third-party component that is used by the Citrix Licensing administration console. These vulnerabilities could potentially allow an unauthorized user to gain

259

Alternative Fuels Data Center: Natural Gas and Propane Retailer License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Retailer License to someone by E-mail Retailer License to someone by E-mail Share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Facebook Tweet about Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Twitter Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Google Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Delicious Rank Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Digg Find More places to share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Natural Gas and Propane Retailer License Compressed natural gas, liquefied natural gas, or liquefied petroleum gas

260

Long-Term Operations Program: Assessment of Research and Development Supporting Aging Management Programs for Long-Term Operation  

Science Conference Proceedings (OSTI)

Presently, U.S. nuclear utilities and the Nuclear Regulatory Commission (NRC) are discussing a second round of plant license renewals, termed subsequent license renewal (SLR). For the U.S. plants this could mean extending a plants operating license from 60 years to 80. To achieve safe and reliable operation for such an extended period will require a comprehensive technical understanding of aging degradation effects on nuclear plant systems, structures, and components (SSCs). EPRI ...

2013-08-29T23:59:59.000Z

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

VERMONT YANKEE NUCLEAR POWER STATION- NRC LICENSE  

E-Print Network (OSTI)

your application for a renewed license of your Vermont Yankee Nuclear Power Station. The enclosed report documents the result of the inspection which was discussed with members of your staff on May 24, 2007, at a publicly observed exit meeting conducted at the Latchis Theater in Brattleboro, VY. The purpose of this inspection was to examine the plant activities and documents that supported the application for a renewed license of the Vermont Yankee Nuclear Power Station. The inspection reviewed the screening and scoping of non-safety related systems, structures, and components, as required in 10 CFR 54.4(a)(2), and determined whether the proposed aging management programs are capable of reasonably managing the effects of aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications. The inspection team concluded screening and scoping of nonsafety-related systems, structures, and components, were implemented as required in 10 CFR 54.4(a)(2), and the aging management portions of the license renewal activities were conducted as described in the License Renewal Application. The inspection results supported a conclusion that the

Mr. Theodore; A. Sullivan

2007-01-01T23:59:59.000Z

262

Inspection of the Department`s export licensing process for dual-use and munitions commodities  

Science Conference Proceedings (OSTI)

The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriate or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.

Not Available

1993-08-10T23:59:59.000Z

263

Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

264

Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

265

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

266

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75 75 p l September 29,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Update to the DOE Implementation Guide for the American Recovery and Reinvestment Act (ARRA) of 2009 SUMMARY: As previously stated, the subject Guide is intended to be a "living document" that will be periodically updated, as necessary. This current update to Version 2.1 is being released as Version 2.1 a. There are two updates to Version 2.1. They are to delete the requirement for management and operating contracts to report by ARRA project code and revise the information in subchapter 4.9 on the reporting of executive compensation. Sections that are amended by Version 2.1 and 2. l

267

MEMORANDUM TO: FILE I' DATE---- SITE  

Office of Legacy Management (LM)

Electtic Corp. applied for licenses to receive knd possess at its Blnirsville and Forest Hills, Pa., plants uranium metal and uranium dioxide enriched in urnniwn 235 for use...

268

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

269

Regression analysis of oncology drug licensing deal values  

E-Print Network (OSTI)

This work is an attempt to explain wide variations in drug licensing deal value by using regression modeling to describe and predict the relationship between oncology drug deal characteristics and their licensing deal ...

Hawkins, Paul Allen

2006-01-01T23:59:59.000Z

270

Multiple clues for license plate detection and recognition  

Science Conference Proceedings (OSTI)

This paper addresses a license plate detection and recognition (LPR) task on still images of trucks. The main contribution of our LPR system is the fusion of different segmentation algorithms used to improve the license plate detection. We also compare ...

Pablo Negri; Mariano Tepper; Daniel Acevedo; Julio Jacobo; Marta Mejail

2010-11-01T23:59:59.000Z

271

Alternative Fuels Data Center: License Exemptions for Biodiesel Production  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

License Exemptions for License Exemptions for Biodiesel Production for Personal Use to someone by E-mail Share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Facebook Tweet about Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Twitter Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Google Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Delicious Rank Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Digg Find More places to share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on AddThis.com...

272

AUTHORS DATE PP  

E-Print Network (OSTI)

The aerospace industry is showing a growing interest to apply acoustic treatment in the exhaust ducts of turbofan engines to attenuate combustion and turbine noise. The design, optimisation and testing of hot stream liners require improved theoretical models and facilities to validate and evaluate the acoustic performances of these liners under realistic engine operating conditions. To extend the capabilities for liner testing, NLR has modified an existing burner rig. The main objective was to build a facility for hot stream liner testing up to a flow Mach number of 0.4 and a maximum temperature of 500 C, which has been met. Both insertion loss and in-situ acoustic impedance measurements can be performed at maximum sound pressure levels of about 145 dB. An overview is given of the design and commissioning of the new facility, the instrumentation and the measurement techniques. Furthermore a selection of results are presented on measured insertion losses and acoustic impedances. Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR-TP-2003-202

R. J. Nijboer; S. L. Sarin

2003-01-01T23:59:59.000Z

273

Radiocarbon dating, memories, and hopes  

SciTech Connect

The history of radiocarbon dating from 1939 to the present is reviewed. The basic principles of radiocarbon dating are that cosmic rays make living things radioactive with {sup 14}C to a certain level fixed by the environment and that at death the intake of food stops so no replenishment of the {sup 14}C steadily lost by the immutable decay occurs. Therefore measurement of the degree of decay gives the time lapse since death, i.e., the radiocarbon age. The equipment developed and experiments performed to measure the specific activity of specimens to be dated are described. The results obtained by world-wide experimenters are discussed. These showed that on simultaneity radiocarbon dating is apparently reliable but that absolute dates may be incorrect by as much as 600 to 700 y. The value of radiocarbon dating to archaeologists, geologists, climatologists, and historians is stressed. (LCL)

Libby, W.F.

1972-01-01T23:59:59.000Z

274

Y-12 cleaning technology licensed by Knoxville engineering firm...  

National Nuclear Security Administration (NNSA)

cleaning technology licensed by Knoxville engineering firm | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

275

Hydrogen and Fuel Cell Technologies Available for Licensing ...  

... Energy Innovation Portal on Google; Bookmark Hydrogen and Fuel Cell Technologies Available for Licensing - Energy Innovation Portal on Delicious ...

276

SAS4A/SASSYS-1 Commercial Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that themedia has been properly installed by Licensee.

277

Oil and Water Dispersion Technology Licensing Opportunity  

E-Print Network (OSTI)

Oil and Water Dispersion Technology Licensing Opportunity Technology Brief Professor Richard can be achieved by the process of degassing. The removal of dissolved gas, for example in oil dispersions. While laboratory scale degassing is predominantly batch processed and time consuming, Professor

278

NRC LICENSE RENEWAL SCOPING/SCREENING INSPECTION  

E-Print Network (OSTI)

Dear Mr. Nazar: On May 21, 2004, the NRC completed an inspection regarding the application for license renewal for the D. C Cook Nuclear Plant. The enclosed report documents the inspection results, which were discussed with members of your staff. The purpose of this inspection was an examination of activities that support the application for a renewed license for D. C. Cook. The inspection consisted of a selected examination of procedures and representative records, and interviews with personnel regarding the process of scoping and screening plant equipment to select equipment subject to an aging management review. The inspection concluded that the scoping and screening portion of license renewal activities was conducted as described in the License Renewal Application and that documentation supporting the application is in an auditable and retrievable form. With the exception of the items identified in this report, your scoping and screening process was successful in identifying those systems, structures, and components required to be considered for aging management. In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

Cynthia D. Pederson; M. Finissi; Plant Manager; G. White; Michigan Public; Service Commission

2004-01-01T23:59:59.000Z

279

Dates Fact Sheet.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

crossing. This enhances an asset owner's situational awareness capability beyond simple event detection and log management. The DATES monitoring platform uses multiple algorithms...

280

Next Release Date: September 2012  

Annual Energy Outlook 2012 (EIA)

October 2010 DOEEIA-0121 (201002Q) Next Release Date: September 2012 Revised: July 2012 Quarterly Coal Report April - June 2010 October 2010 U.S. Energy Information...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Managing license compliance in free and open source software development  

Science Conference Proceedings (OSTI)

License compliance in Free and Open Source Software development is a significant issue today and organizations using free and open source software are predominately focusing on this issue. The non-compliance to licenses in free and open source software ... Keywords: Compatibility analysis, Compliance management, Free and open source software, License compliance, Rights expression languages

G. R. Gangadharan; Vincenzo D'Andrea; Stefano Paoli; Michael Weiss

2012-04-01T23:59:59.000Z

282

Software License Agreement | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

License Agreement License Agreement Print page Print page Email page Email page U.S. Department of Energy Office of Scientific and Technical Information Energy Science and Technology Software Center As the Office of Scientific and Technical Information's (OSTI) Energy Science and Technology Software Center (ESTSC), we are authorized to license and distribute this software to you. Upon receipt of license fee and execution of this license, the herein identified computer software package (software and accompanying documentation) is licensed, on a non-exclusive basis, to the UNDERSIGNED for use ONLY at the site designated herein below, and is to be used in accordance with this license and with the special restrictions identified below or on the software package. DOE-funded modifications, enhancements, or conversions of this

283

Property:Achievement Date | Open Energy Information  

Open Energy Info (EERE)

Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&oldid...

284

Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues  

Science Conference Proceedings (OSTI)

This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

1998-07-01T23:59:59.000Z

285

DOE NETL Intellectual Property Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

18.12 18.12 DOE NETL Intellectual Property Available for Licensing Complete marketing summaries of the following technologies will be posted on the NETL Available Technologies page shortly. For additional information or to submit a license application, please contact techtransfer@netl.doe.gov. Technology Title and Brief Description Intellectual Property Status Metal oxide promoters for improving the reactivity and capacity of oxygen carriers for the chemical looping combustion process This invention provides an oxygen carrier comprised of a plurality of metal oxide particles in contact with a plurality of MgO promoter particles. The MgO promoter particles increase the reaction rate and oxygen utilization of the metal oxide when contacting with a gaseous hydrocarbon at a temperature greater than

286

NRC antitrust licensing actions, 1978--1996  

Science Conference Proceedings (OSTI)

NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

Mayer, S.J.; Simpson, J.J.

1997-09-01T23:59:59.000Z

287

Licensing : BioEnergy Science Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Available for Licensing Available for Licensing As new inventions are disclosed from BESC researchers, we will post information about the inventions on this webpage. Use the search engine below to match your technology needs with BESC disclosures or view all technologies in a particular category by clicking on the category below. View all inventions Enter keywords in the box. Separate the words with a comma (,) for multiple keywords. GO Advanced Biofuels (1 Inventions) Bioconversion (2 Inventions) Biomass Grasses (7 Inventions) Trees (1 Inventions) Genetic Tools (9 Inventions) Biotechnology (9 Inventions) Imaging (2 Inventions) PreTreatment (2 Inventions) Adams, Michael A (2 Inventions) Albersheim, Ivana G. (1 Invention) Backe, Jason (1 Invention) Bar-Peled, Maor (1 Invention) Bhave, Ramesh R (2 Inventions)

288

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

289

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

290

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

291

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

292

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

293

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

294

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

covers competitions. Word versions of the four templates will be available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

295

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

296

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the fourteen aforementioned RFP Section L and M templates are available in STRIPES as part of the series of DOE-L-1024 or DOE-M-1005 clauses. This Flash will be...

297

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the three aforementioned RFP Section H and L templates are available in STRIPES. This Flash will be available online within a day, at the following website: http:...

298

Dates:  

NLE Websites -- All DOE Office Websites (Extended Search)

of the determinants of fire behavior though studying inputs (weather, slope, fuels, and fuel moisture); learn how to interpret fire behavior outputs; documentation processes; &...

299

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

300

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

302

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

303

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

304

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

305

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

306

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

307

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

308

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

309

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

310

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

311

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

existing technologies to advance weld quality monitoring and closed loop feedback for welding systems and techniques typically used in the nuclear industry. 9. Stress Corrosion...

312

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed without further CRM office involvement. Generating and Managing Waste - Industrial waste in the form of general construction debris such as waste concrete, scrap...

313

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

owners rely on and hold contracts with Western for access to affordable and reliable bulk power supply from the Pick Sloan hydro electric system and transmission service from the...

314

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render...

315

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Managing Waste: Wooden material wastes would be generated from dimension lumber, plywood and particle board. No regulated wastes (e.g. chemicals, asbestos) are anticipated to...

316

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background Purpose &...

317

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CERCLA Disposal Facility or at an approved off-Site facility through Waste Generator Services. 19. Work within areas Subject to Flooding - Since the well abandonment work is...

318

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPA filters. These materials will be packaged and disposed of through Waste Generation Services. 19. Work in Areas Subject to Flooding - The activities discussed are planned to...

319

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B....

320

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Date  

E-Print Network (OSTI)

This Design Manual Chapter 1620 Supplement is to revise WSDOT policy relating to the selection of impact attenuator systems. If you maintain a printed manual, please remove the current Chapter 1620 and replace it with the August 2011 Supplement. To get the latest information on WSDOT administrative and engineering manuals, sign up for

unknown authors

2011-01-01T23:59:59.000Z

322

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Accumulation Areas (SAAs) or a <90-day storage areas before shipping to a treatment, storage, and disposal facility (TSDF). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL...

323

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will pack, move, setup, and test the NGWTB electronic equipment. In addition, the propane tank located at CFA-666 will be relocated to CFA-661. Three propane heaters and...

324

Date  

E-Print Network (OSTI)

This thesis has been reviewed by the research advisor, research coordinator, and department chair and has been found to be satisfactory.

Clark David; Wilson Blockburger

2006-01-01T23:59:59.000Z

325

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

326

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

327

Carbonaceous Chemistry for Computational Modeling Licensing and Partnership Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemistry for Computational Modeling Chemistry for Computational Modeling Opportunity The Department of Energy's National Energy Technology Laboratory (NETL) has developed a software platform entitled Carbonaceous Chemistry for Computational Modeling (C3M) that is used to access a variety of kinetic processes and reaction mechanisms typically found in coal gasification, gas clean-up, and carbon capture processes. This unique software provides the user the ability to conduct virtual kinetic experiments using leading kinetic packages and available experimental data to evaluate kinetic predictions as a function of fuel and sorbent type and/or operating conditions. A Patent Cooperation Treaty application was filed in June 2008. NETL is seeking non-exclusive licensing partners interested in implementing

328

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

Frigo, Janette Rose [Los Alamos National Laboratory; Brennan, Sean M [Los Alamos National Laboratory; Rosten, Edward J [Los Alamos National Laboratory; Raby, Eric Y [Los Alamos National Laboratory; Kulathumani, Vinod K [WEST VIRGINIA UNIV.

2009-01-01T23:59:59.000Z

329

The Atomic Safety and Licensing Board Panel  

SciTech Connect

Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

NONE

1998-03-01T23:59:59.000Z

330

104th Dates to Remember  

Science Conference Proceedings (OSTI)

Questions? Contact Connie Hilson, AOCS Exhibits Specialist, by email: connieh@aocs.org or by phone: +1 217-639-4831. Dates to Remember * January 7, 201/span>3 Online registration opens January 15, 201/span>3 Exhibitor presentations: Deadl

331

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

332

License Application Design Selection Report, REV 01. August 1999  

Science Conference Proceedings (OSTI)

In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II, these enhanced design alternatives were refined, screened for accepatable postclosure performance, and evaluated against a set of criteria addressing four broad aspects of the repository: performance demonstrability; flexibility; construction, operations and maintenance; and cost. Based on this evaluation, a conceptual design was recommended to DOE and could be characterized as a low thermal impact design. Included in the report is more in depth information regarding the basis of the recommendation, performance issues, benefits related to reduced uncertainties, construction/operational benefits, technical and programmatic flexibilty and cost impacts.

Hastings, C.R.

1999-08-30T23:59:59.000Z

333

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-009047: Categorical Exclusion Determination New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009046: Categorical Exclusion Determination Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009007: Categorical Exclusion Determination Northeast Provider of Solar Photovoltaic Instructor Training CX(s) Applied: A9, A11, B5.16 Date: 08/08/2012 Location(s): New York Offices(s): Golden Field Office August 8, 2012 CX-009045: Categorical Exclusion Determination Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

334

Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository  

SciTech Connect

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.

Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

2002-02-26T23:59:59.000Z

335

City of Dubuque - Solar Thermal Licensing Requirement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement < Back Eligibility Construction Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Iowa Program Type Solar/Wind Contractor Licensing Provider City of Dubuque The City of Dubuque requires a Solar Thermal License in order for a person to install a solar thermal project on a home or business. The requirement does not apply to solar photovoltaics. The licensing requirement can be met one of two ways. An installer may be Solar Thermal Certified by the North American Board of Certified Energy Practitioners (NABCEP) or An installer may complete the Northeast Iowa Community College Solar Thermal Training Installers are also required to obtain a permit before altering or

336

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Madison - Contractor Licensing of Madison - Contractor Licensing City of Madison - Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Wisconsin Program Type Solar/Wind Contractor Licensing Provider City of Madison Although the State of Wisconsin does not have any specific laws for contractors dealing with renewable energy, the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code is a requirement for a Class A-4 license for "a person desiring to enter into the business of installing, altering or repairing active solar heating equipment" as well as fee and examination details. As a result of a

337

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

338

Patents Licensing and Patent Waivers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patent Licensing The DOE Invention Licensing Program provides information on licensing of DOE-owned inventions. Patent Waivers Patent Rights - Waiver Clause: This clause makes modifications to the Patent Rights clause of 48 C.F.R. 52.227-12 and should replace that clause in the contract when an advance waiver is granted. Petition form for advance waiver (PDF) to contractor of Government's title to inventions that may be made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Petition form for waiver (PDF) to contractor of Government's title to an identified invention already made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Patent Waiver Decisions:

339

Dating deception: Gender, online dating, and exaggerated self-presentation  

Science Conference Proceedings (OSTI)

This study examined how differences in expectations about meeting impacted the degree of deceptive self-presentation individuals displayed within the context of dating. Participants filled out personality measures in one of four anticipated meeting conditions: ... Keywords: Gender differences, Internet, Mate selection, Personality, Self-presentation

Rosanna E. Guadagno; Bradley M. Okdie; Sara A. Kruse

2012-03-01T23:59:59.000Z

340

Decommissioning of the Nuclear Licensed Facilities at the Fontenay aux Roses CEA Center  

SciTech Connect

This is a summary of the program for the decommissioning of all the CEA's facilities in Fontenay aux Roses. The particularity of this center is that it is located in a built-up area. Taking into account the particularities of the various buildings and the levels of radioactivity in them, it was possible to devise a coherent, optimized program for the CEA-FAR licensed nuclear facility decommissioning operations.

Jeanjacques, Michel; Piketty, Laurence; Mandard, Lionel; Pedron, Guy; Boissonneau, Jean Francois; Fouquereau, Alain; Pichereau, Eric; Lethuaire, Nathalie; Estivie, David; Binet, Cedric; Meden, Igor [Commissariat a l'Energie Atomique, Direction de l'Energie Nucleaire, Direction deleguee des Activites Nucleaires de Saclay, Departement des Reacteurs et des Services Nucleaires, Service d'Assainissement de Fontenay Aux Roses : 18, route du Panorama, BP6, 92265 Fontenay aux Roses Cedex (France)

2008-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Vorbeck Materials Licenses Graphene-based Battery Technologies ...  

Vorbeck Materials Licenses Graphene-based Battery Technologies Vorbeck Materials Corp of Jessup, MD participated in the Americas Next Top Energy Innovator program ...

342

LED North America Receives Exclusive Patent License for ORNL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Highlights Success Stories Contact Us Index Home | ORNL | Success Stories SHARE LED North America Receives Exclusive Patent License for ORNL Technology June 19, 2013 Views...

343

Get listed in the Directory of Licensed Professionals | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

or Province(s) in which you are a licensed Professional Engineer or Registered Architect Whether you hold a Green Building Engineer certification from the Association of...

344

Glass Furnace Model (GFM) Six-Month Trial License  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

345

Non-exclusive patent license agreement between Alliance and ...  

DRAFT FOR DISCUSSION PURPOSES ONLY Page 1 of 19 NON-EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And

346

City of Madison - Contractor Licensing (Wisconsin) | Open Energy...  

Open Energy Info (EERE)

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

347

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

348

Sandia National Laboratories : Licensing/Technology Transfer News  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; News. IP Home; Search/Browse Technology Portfolios; Licensing Overview ...

349

NETL: News Release - DOE Licenses Mercury Control Patent to Help...  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2007 DOE Licenses Mercury Control Patent to Help Meet Clean Air Regulations Research Aims at Trace Element Reduction from Power Generation Facilities by 2010 Washington, DC - A...

350

MC2, Version 3.0, Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

351

NETL: News Release - Licensing Agreement Moves Two NETL-Patented...  

NLE Websites -- All DOE Office Websites (Extended Search)

March 23, 2011 Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Washington, D.C. - Two new patented sorbents used for carbon dioxide...

352

Argonne, Evigia finalize licensing agreement for next-gen RFID...  

NLE Websites -- All DOE Office Websites (Extended Search)

See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16,...

353

U.S. Department of Energy Technologies Available for Licensing ...  

U.S. Department of Energy Technologies Available for Licensing Our Mission. The mission of the Energy Department is to ensure Americas security and prosperity by ...

354

NRC Licensing Strategy Development for the NGNP  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

Mark R. Holbrook; Trevor Cook

2008-09-01T23:59:59.000Z

355

Data Administration Area: Date Issued  

E-Print Network (OSTI)

Policy Data Administration Policy Area: Date Issued: April, 1994 Title: Data Administration Last. INTRODUCTION The President established the Committee on Data Administration (CODA) in May, 1992, to advise him on policies in the area of data administration (attached as references Policy ADC 011 and TOR for CODA

Brownstone, Rob

356

Effective Date: MEMORANDUM OF UNDERSTANDING  

E-Print Network (OSTI)

complementary goals in aviation and future space transportation, to coordinate planning efforts, and to haveEffective Date: MEMORANDUM OF UNDERSTANDING Between DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION IN AVIATION AND SPACE TRANSPORTATION I. PURPOSE The Department of TransportatiodFederal Aviation

357

UNDERGRADUATE HANDBOOK 2011 Final Dates  

E-Print Network (OSTI)

............................................................................................................... Friday 23 September Last day for receipt of applications to enrol for 2012 through UAC without financial to be confirmed. Semester & session dates for 2012 First Semester Information Systems Head of School and Professor of Accounting FARGHER, Professor Neil L., BCom Melb MBus RMIT

358

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-001-C NEPA ID No.: PXP-10-0005 Operations Systems Development & Integration Application of DOE NEPA Procedure: The Categorical Exclusion B1.7, Applicable to Facility Operations...

359

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

360

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Successful Clean Coal Technology Licensed for Commercial Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Clean Coal Technology Licensed for Commercial Successful Clean Coal Technology Licensed for Commercial Application Successful Clean Coal Technology Licensed for Commercial Application July 26, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH™) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

362

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

363

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Wind Program Info State Connecticut Program Type Solar/Wind Contractor Licensing Provider Connecticut Department of Consumer Protection The Connecticut Department of Consumer Protection (DCP) is authorized to issue licenses for solar-thermal work, solar-electric work and wind-electric work. "Solar thermal work" is defined as "the installation, erection, repair, replacement, alteration, or maintenance of active, passive and hybrid solar systems that directly convert ambient energy into heat or convey, store or distribute such ambient energy." Solar electricity

364

Los Alamos National Laboratory announces Express Licensing program  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL announces Express Licensing program LANL announces Express Licensing program Los Alamos National Laboratory announces Express Licensing program With the launch of a new "Express Licensing" program, access to innovative technology invented at Los Alamos National Laboratory has gotten easier. August 1, 2013 The following sequence shows the formation of nanoFOAM technology developed at Los Alamos National Laboratory. NanoFOAMs are self-supporting nanoporous metal foams that have potential applications in oil-refining processes, filtration of liquid or airborne germs, rocket fuels or catalytic production of a range of products from ammonia to plastics. NanoFOAM is just one of many licensable technologies available at Los Alamos National Laboratory. The following sequence shows the formation of nanoFOAM technology developed

365

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Maine Program Type Solar/Wind Contractor Licensing In order to be eligible for Maine's solar thermal rebate program, systems must be installed by licensed plumbers who have received additional certification for solar thermal systems from the North American Board of Certified Energy Practitioners (NABCEP). The state solar thermal rebate program maintains a list of Efficiency Maine registered vendors/installers. In addition, Efficiency Maine has information for vendors interested in becoming registered and listed on the [http://www.efficiencymaine.com/at-home/registered-vendor-locator web

366

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determinations By Date September 24, 2012 CX-009335: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 0924...

367

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By Date April 11, 2011 CX-005702: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Schmitz, Mary C. Date: 04112011 Location(s): Minnesota...

368

OMB No. 1905-0175 Expiration Date: 12/31/2011 Version No ...  

U.S. Energy Information Administration (EIA)

CURRENT POST-EMERGENCY PLANT OPERATIONAL STATUS MMcf/Day Expiration Date: 12/31/2011 OMB No. 1905-0175 FORM EIA-757 Schedule B: Emergency Status ...

369

REFERENCE: INSPECTORS: DATE OF REPORT:  

E-Print Network (OSTI)

SITE: Installations for monitoring and controlling radioactive discharges and for surveillance of the environment in Lithuania during normal operations of the Ignalina nuclear power plant

Ignalina Nuclear; Power Plant; Mr S. Van Der Stricht; Mr V. Tanner; Mr P. Beuseling; Mr Y-h; Bouget France; Ms A. Godeanu Metz (trainee; Y-h Bouget; A. Godeanu Metz; P. Beuseling

2005-01-01T23:59:59.000Z

370

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Procedure: The Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapons, also known as the Site Wide EIS,...

371

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2009 August 5, 2009 CX-000510: Categorical Exclusion Determination Isolation of Domestic and Fire Water Lines, 710-B CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000507: Categorical Exclusion Determination Building. 728-N Cut and Grout Domestic Water and Plant Air Lines CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000508: Categorical Exclusion Determination Electrical Isolation of Building 710-B CX(s) Applied: B4.10 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009

372

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8004: Categorical Exclusion Determination 8004: Categorical Exclusion Determination Siting, Construction, Modifying, and Operating Small-Scale Structures CX(s) Applied: B1.15 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office November 28, 2011 CX-007758: Categorical Exclusion Determination Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): Illinois Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007757: Categorical Exclusion Determination Multipurpose Target Chamber for High-Temperature Ion Irradation - University of Tennessee CX(s) Applied: B3.10 Date: 11/28/2011 Location(s): Tennessee Offices(s): Nuclear Energy, Idaho Operations Office

373

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 CX-008626: Categorical Exclusion Determination Replace 607-6A Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008625: Categorical Exclusion Determination Abandonment of M-Area Oil Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008624: Categorical Exclusion Determination Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008623: Categorical Exclusion Determination Perform Thermal Analysis and Thermal Exposures (TG-DTA)

374

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 0, 2012 CX-008625: Categorical Exclusion Determination Abandonment of M-Area Oil Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008624: Categorical Exclusion Determination Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008623: Categorical Exclusion Determination Perform Thermal Analysis and Thermal Exposures (TG-DTA) CX(s) Applied: B3.6 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008546: Categorical Exclusion Determination National Open-ocean Energy Laboratory

375

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2013 15, 2013 CX-010034: Categorical Exclusion Determination Deactivation and Decommissioning of Soil Vapor Extraction Units CX(s) Applied: B1.23 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 15, 2013 CX-010033: Categorical Exclusion Determination Savannah River National Laboratory Electrolyzer 30 weight % Sulfuric Acid pH Adjustment CX(s) Applied: B3.6 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 15, 2013 CX-010032: Categorical Exclusion Determination Separation of the Minor Actinides from the Lanthanides with Magnetic Fields CX(s) Applied: B3.6 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 15, 2013 CX-009928: Categorical Exclusion Determination

376

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2010 January 5, 2010 CX-000802: Categorical Exclusion Determination Transmission Electron Microscopy Specimen Preparation by Electropolishing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000803: Categorical Exclusion Determination Production of Hazardous Enhanced Chemical Cleaning Sludge Simulants CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000804: Categorical Exclusion Determination 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

377

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-006404: Categorical Exclusion Determination Install a Pressure Regulator and Relief Valve on the Tank 26 Flush Water Piping CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006403: Categorical Exclusion Determination Enhanced Low Activity Waste Disposal Premix Silo Area Modifications CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006402: Categorical Exclusion Determination 704-N Wireless Access CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011

378

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 1, 2012 CX-008748: Categorical Exclusion Determination Automated Serial Sectioning and Imaging in Support of Nuclear Materials Analysis - Colorado School of Mines CX(s) Applied: B3.6 Date: 05/21/2012 Location(s): Idaho Offices(s): Idaho Operations Office May 21, 2012 CX-008747: Categorical Exclusion Determination Developing the Currently Existing Nuclear Instrumentation and Radiation Research Laboratories at Alcorn State University CX(s) Applied: B1.2 Date: 05/21/2012 Location(s): Idaho Offices(s): Idaho Operations Office May 21, 2012 CX-008746: Categorical Exclusion Determination Reactor Infrastructure Improvement at Kansas State University Nuclear Reactor - Kansas State University CX(s) Applied: B2.2 Date: 05/21/2012 Location(s): Idaho Offices(s): Idaho Operations Office

379

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2011 30, 2011 CX-007657: Categorical Exclusion Determination Preparation of Phase-Pure Standards CX(s) Applied: B3.6 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 30, 2011 CX-007656: Categorical Exclusion Determination Operation of Extrel MAX300LG Mass Spectrometer and VICI Metronics Dynacalibrator Calibration Gas Generator at 999-1W CX(s) Applied: B3.6 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 30, 2011 CX-007398: Categorical Exclusion Determination Scalable High-Efficiency Thin-Crystalline Silicon Cells Enabled by Light-Trapping Nanostructures CX(s) Applied: A9, B3.6 Date: 11/30/2011 Location(s): Massachusetts Offices(s): Golden Field Office November 30, 2011 CX-007580: Categorical Exclusion Determination

380

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-004846: Categorical Exclusion Determination Work in the High Pressure Laboratory CX(s) Applied: B3.6 Date: 12/17/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 17, 2010 CX-004844: Categorical Exclusion Determination B-Wing High Activity Drain Exhaust (HADE) Filter Housing CX(s) Applied: B1.3 Date: 12/17/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 17, 2010 CX-004843: Categorical Exclusion Determination Stable Electrocatalysts for High Temperature Fuel Cells CX(s) Applied: B3.6 Date: 12/17/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 17, 2010 CX-004841: Categorical Exclusion Determination Scanned Probe Microscopy Surface Analysis and Sample Preparation

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 9, 2009 September 9, 2009 CX-000527: Categorical Exclusion Determination Paving of Gravel Road from Road E to Gate 16 CX(s) Applied: B1.13 Date: 09/09/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 9, 2009 CX-000526: Categorical Exclusion Determination M-Area Chemical Oxidation (MACO) CX(s) Applied: B6.1 Date: 09/09/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 9, 2009 CX-000525: Categorical Exclusion Determination Isolation of Fire Water System, 261-H Consolidated Incineration Facility CX(s) Applied: B1.27 Date: 09/09/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

382

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-009619: Categorical Exclusion Determination Dissolution of Sludge Constituents in Glycolate-Containing 2H Evaporator Rad Feed Solution CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009618: Categorical Exclusion Determination Defense Threat Reduction Agency (DTRA) Radar Testing CX(s) Applied: B3.1 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009617: Categorical Exclusion Determination Gas Mass Spectrometry CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009432: Categorical Exclusion Determination Transformational Approach to Reducing the Total System Costs of Building

383

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-003956: Categorical Exclusion Determination L Area Disassembly Basin Rack Removal / Installation Project CX(s) Applied: B1.3 Date: 09/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office September 15, 2010 CX-003955: Categorical Exclusion Determination Column Loading of Crystalline Silicotitanate CX(s) Applied: B3.6 Date: 09/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office September 15, 2010 CX-003954: Categorical Exclusion Determination Sample Analyses for Site Characterization Programs and Work for Others CX(s) Applied: B3.6 Date: 09/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office September 15, 2010 CX-003953: Categorical Exclusion Determination

384

TEAM 1 Drivers License.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

I I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure  Understand potential X-ray hazards of the modified instrument and shielding  Read and understand the Low Dose Machine Authorization document  Recognize high voltage hazards with the TEAM stage  Demonstrate handling of column valves  Point out where emergency contact numbers are posted

385

Patent Protection and Licensing Procedure | BNL Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL Inventors BNL Inventors Patent Protection and Licensing Procedure TCP Staff Assignment - Invention Disclosures received by Intellectual Property Legal Group (IPLG) will be given a BNL number, and assigned to a specific TCP staff member for commercial assessment. Henceforth, the assigned staff member will be responsible for all commercialization actions relating to the docket. Assessment - The TCP staff member assigned to the docket will meet with the inventor(s). Together they will discuss the invention and make a preliminary evaluation of potential applications and possible markets. Based on commercial assessment and a preliminary novelty determination, the TCP staff will make a recommendation to the IPLG whether to patent the invention. The TCP's decision and relevant documents will be circulated

386

2014 NEJC Save the Date (Spanish)  

Energy.gov (U.S. Department of Energy (DOE))

2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014

387

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-C 2-C NEPA ID No.: PXP-11-0004 Operations Systems Development & Integration Application of DOE NEPA Procedure: The Categorical Exclusion B4.6, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to project number LIN- 11-002-C. Rationale: The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), Pantex Site Office, proposed an Operations Systems Development and Integration (OSD&I) project in Fiscal Year 2010, under project number LIN-10-001-C, to replace the existing functionality being performed by MRP-II/CAS. The project would enhance manufacturing operations utilizing modern software solutions. The project also would provide a technology refresh with added capability. NEPA Review Form PXP-10-0005 determined that

388

Summary of potassium/argon age dating, 1979  

DOE Green Energy (OSTI)

During FY-79 the K/Ar dating laboratory at the Department of Geology and Geophysics of the University of Utah became operational. During the past calendar year forty-seven dates have been produced from areas predominantly in Utah. Dating has also been done on areas in Nevada and Montana through the State-Coupled program and Case Studies Support program. Areas in wich activity was concentrated include: Cove Creek Domes/Twin Peaks Area, SW Utah. Here volcanic activity spanned the time from 2.74 to 2.35 M.Y., with a mean age of 2.50 +- 0.14 M.Y. Black Rock Desert, SW Utah. Two dates on a single flow indicate an age of 1.49 +- 0.08 M.Y. for a flow previously undated. Wildcat Creek Area, SW Utah. Dating of rhyolite flows from this area gives a mean age of volcanism of 9.25 +- 0.16 M.Y., considerably older than previously inferred by the work of Haugh (1978). Mineral Mountains Pluton, SW Utah. Twelve dates on phases of the pluton indicate a complex history of intrusion, and more work is indicated in order to derive a coherent picture of the magmatic events leading to the formation of this batholith. Blackfoot Reservoir, Idaho. Two dates on rhyolite domes, previously updated, give ages of 1.56 +- 0.06 M.Y. and 1.28 +- 0.15 M.Y.

Evans, S.H. Jr.

1980-02-01T23:59:59.000Z

389

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

390

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

391

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 CX-007075: Categorical Exclusion Determination Wisconsin-City-Green Bay CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 09/27/2011 Location(s): Green Bay, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office September 27, 2011 CX-006971: Categorical Exclusion Determination Clean Energy Coalition - Michigan Green Fleets CX(s) Applied: A7, B5.1 Date: 09/27/2011 Location(s): Detroit, Michigan Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office September 27, 2011 CX-006969: Categorical Exclusion Determination Clean Energy Coalition - Michigan Green Fleets CX(s) Applied: B5.1 Date: 09/27/2011 Location(s): Plymouth, Michigan Office(s): Energy Efficiency and Renewable Energy, Savannah River

392

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003667: Categorical Exclusion Determination Slit Trench 1 - 5 Closure Activity CX(s) Applied: B6.1 Date: 07/27/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 27, 2010 CX-003666: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 07/27/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 27, 2010 CX-003247: Categorical Exclusion Determination Alaska-Tribe-Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/27/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 27, 2010 CX-003503: Categorical Exclusion Determination Water and Energy Emergency End Use Demand Management Measures CX(s) Applied: A1, A9, A11, B5.1

393

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2012 4, 2012 CX-009062: Categorical Exclusion Determination Dismantle and Remove Low Level Waste Loading Station, Building 735-A CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009061: Categorical Exclusion Determination Analytical Development Wet Chemistry Methods CX(s) Applied: B3.6 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-008603: Categorical Exclusion Determination South Dakota Program year 2012 State Energy Plan CX(s) Applied: A9, A11 Date: 07/24/2012 Location(s): South Dakota Offices(s): Golden Field Office July 24, 2012 CX-008594: Categorical Exclusion Determination Idaho Program Year 2012 State Energy Program Formula Grants

394

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 4, 2012 June 4, 2012 CX-008633: Categorical Exclusion Determination Dismantlement and Removal of 321-M Solvent Storage Tank Area Dynamic Underground Stripping (DUS I) Remnants CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 4, 2012 CX-008632: Categorical Exclusion Determination Sampling of Soil Vapor Extraction Wells at the Western Sector Dynamic Underground Stripping System CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 4, 2012 CX-008482: Categorical Exclusion Determination Composite Riser for Ultra-Deepwater High Pressure Wells CX(s) Applied: A9, A11 Date: 06/04/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory June 4, 2012

395

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000541: Categorical Exclusion Determination Checkout of StreamPro ADCP (Acoustic Doppler Current Profiler) Velocity Meter CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination

396

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2010 10, 2010 CX-004043: Categorical Exclusion Determination Pier 2 Project CX(s) Applied: B5.1 Date: 08/10/2010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 10, 2010 CX-003971: Categorical Exclusion Determination Bench Scale Process Development - In-Line Mixing Study CX(s) Applied: B3.6 Date: 08/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 10, 2010 CX-003632: Categorical Exclusion Determination Analysis of Evaporator Scale Sample CX(s) Applied: B3.6 Date: 08/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 10, 2010 CX-003631: Categorical Exclusion Determination Asbestos Removal in Spent Fuel Project (SFP) Facilities

397

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2013 14, 2013 CX-010493: Categorical Exclusion Determination Determining Distribution Coefficients by Surface-Enhanced Raman Spectroscopy (SERS) CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010492: Categorical Exclusion Determination Permeation Testing Metals, Ceramics, and Polymers CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010282: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): New Jersey Offices(s): National Energy Technology Laboratory May 14, 2013 CX-010281: Categorical Exclusion Determination

398

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 CX-008983: Categorical Exclusion Determination Heliostat System with Wireless Closed-Loop Control CX(s) Applied: B3.6 Date: 08/06/2012 Location(s): California Offices(s): Golden Field Office August 3, 2012 CX-009223: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Asbestos Removal Actions CX(s) Applied: B1.16 Date: 08/03/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office August 3, 2012 CX-009052: Categorical Exclusion Determination Remove the Highpoint VAMP ED-641000-IT-RISH-6097A From Service CX(s) Applied: B2.2 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 3, 2012 CX-009093: Categorical Exclusion Determination Knolls Laboratory Q14 Sprinkler System Upgrade Project

399

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2009 8, 2009 CX-000392: Categorical Exclusion Determination Texas Energy Gasification Project CX(s) Applied: A1, A9 Date: 12/08/2009 Location(s): Beaumont, Texas Office(s): Fossil Energy, National Energy Technology Laboratory December 8, 2009 CX-000820: Categorical Exclusion Determination Vacuum Induction Melting of Metals CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000818: Categorical Exclusion Determination Scanned Probe Microscopy Surface Analysis and Sample Preparation CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 7, 2009 CX-005086: Categorical Exclusion Determination

400

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 CX-010148: Categorical Exclusion Determination Merritt Radio Station Upgrade CX(s) Applied: B1.19 Date: 04/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 18, 2013 CX-010319: Categorical Exclusion Determination General Chemical Support Operations for NHS, HP CX(s) Applied: B3.6 Date: 04/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 18, 2013 CX-010554: Categorical Exclusion Determination Yale University- Power Generation from Waste Heat with Closed Loop Membrane-Based System CX(s) Applied: B3.6 Date: 04/18/2013 Location(s): Connecticut, Colorado Offices(s): Advanced Research Projects Agency-Energy April 17, 2013 CX-010188: Categorical Exclusion Determination Field Demonstration of a Novel Eco-Friendly Production Enhancement Process

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 4, 2012 October 4, 2012 CX-009220: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Siting, Construction, and Operation of Support Buildings and Support Structures CX(s) Applied: B1.15 Date: 10/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office October 4, 2012 CX-009170: Categorical Exclusion Determination Low Cost Arc-Fault Detection and Protection for Photovoltaic Systems-Tigo Energy, Inc. CX(s) Applied: B3.6 Date: CX: none Location(s): California Offices(s): Golden Field Office October 3, 2012 CX-009410: Categorical Exclusion Determination Granby (Farr) Pumping Plant Nest Removal Project CX(s) Applied: B1.3 Date: 10/03/2012 Location(s): Colorado Offices(s): Western Area Power Administration October 2, 2012 CX-009219: Categorical Exclusion Determination

402

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

403

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-006354: Categorical Exclusion Determination Extraction and Recovery of Lignin and Hemicellulose from Biomass CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006353: Categorical Exclusion Determination Grout Formulation and Variability Testing CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006349: Categorical Exclusion Determination Ohio-City-Cuyahoga Falls CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 06/23/2011 Location(s): Cuyahoga Falls, Ohio Office(s): Energy Efficiency and Renewable Energy June 23, 2011 CX-006347: Categorical Exclusion Determination

404

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2012 November 29, 2012 CX-009633: Categorical Exclusion Determination Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 28, 2012 CX-009552: Categorical Exclusion Determination Central Vermont Recovered Biomass Facility CX(s) Applied: B5.20 Date: 11/28/2012 Location(s): Vermont Offices(s): Golden Field Office November 28, 2012 CX-009547: Categorical Exclusion Determination Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project')

405

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 1, 2013 August 1, 2013 CX-010819: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1, B3.6 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory August 1, 2013 CX-010835: Categorical Exclusion Determination Disconnect Equipment and Activate Gloveboxes From Lab 174, Gloveboxes 12 & 13 CX(s) Applied: B2.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010834: Categorical Exclusion Determination 704-L Machine Shop Equipment Removal CX(s) Applied: B1.24 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010818: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three

406

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 CX-010818: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory August 1, 2013 CX-010833: Categorical Exclusion Determination Subcontractor Will Clean Out Gutters Causing Leaks in 706-N CX(s) Applied: B1.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010832: Categorical Exclusion Determination Subcontractor Will Perform Roof Leak Repairs on 717-8N CX(s) Applied: B1.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010817: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three

407

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2013 , 2013 CX-010820: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1, B3.6 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010836: Categorical Exclusion Determination Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010819: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three

408

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2013 July 16, 2013 CX-010858: Categorical Exclusion Determination Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 16, 2013 CX-010857: Categorical Exclusion Determination Replace 735-A South Header Ductwork Located on D-wing Service Floor CX(s) Applied: B2.3 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 15, 2013 CX-010717: Categorical Exclusion Determination

409

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 CX-004105: Categorical Exclusion Determination High Resolution Three-Dimensional Laser Imaging for Inspection, Maintenance, Repair and Operations CX(s) Applied: B3.6 Date: 09/30/2010 Location(s): Houston, Texas Office(s): Fossil Energy, National Energy Technology Laboratory September 30, 2010 CX-004100: Categorical Exclusion Determination High Resolution Three-Dimensional Laser Imaging for Inspection, Maintenance, Repair and Operations CX(s) Applied: B3.6 Date: 09/30/2010 Location(s): Boulder, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory September 30, 2010 CX-004099: Categorical Exclusion Determination Advanced Energy Efficient Building Technologies for High Performance Hospitals CX(s) Applied: A9 Date: 09/30/2010 Location(s): Eugene, Oregon

410

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2013 19, 2013 CX-010614: Categorical Exclusion Determination Development of Criteria for Flashback Propensity in Jet Flames for High H2 Content and Natural Gas Fuels CX(s) Applied: A1, A9, B3.6 Date: 07/19/2013 Location(s): California Offices(s): National Energy Technology Laboratory July 18, 2013 CX-010854: Categorical Exclusion Determination 906-T Air Stripper Dismantle and Removal CX(s) Applied: B1.23 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 18, 2013 CX-010853: Categorical Exclusion Determination Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 18, 2013 CX-010852: Categorical Exclusion Determination

411

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-007758: Categorical Exclusion Determination Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): Illinois Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007757: Categorical Exclusion Determination Multipurpose Target Chamber for High-Temperature Ion Irradation - University of Tennessee CX(s) Applied: B3.10 Date: 11/28/2011 Location(s): Tennessee Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-008003: Categorical Exclusion Determination Microbiological and Biomedical Research Projects CX(s) Applied: B3.12 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office November 28, 2011

412

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-007776: Categorical Exclusion Determination Placing a Facility in an Environmentally Safe Condition CX(s) Applied: B1.28 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007775: Categorical Exclusion Determination Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007547: Categorical Exclusion Determination Turbine Aeration Design Software for Mitigating Adverse Environmental Impacts Resulting From Conventional Hydropower Turbines CX(s) Applied: A9, B3.6 Date: 01/13/2012 Location(s): Minnesota Offices(s): Golden Field Office January 13, 2012 CX-007609: Categorical Exclusion Determination

413

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-C 2-C NEPA ID No.: PXP-10-0004 Deactivation & Decommissioning of the North Compost Tent Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Environmental Restoration's (ER) North Compost Tent, which was damaged by a storm in 2003 and has not been fully operational since then. It is considered unsalvageable by the Facility & Systems Design Department. Demolition will consist of: Removal of clay soil (approximately 1 foot deep) and two liners (polyvinylchloride and

414

State of California BOARD OF EQUALIZATION CIGARETTE AND TOBACCO PRODUCTS LICENSING ACT REGULATIONS  

E-Print Network (OSTI)

A new license shall not be issued to an applicant when any of the following apply: (1) a license subject to civil or criminal citation has been issued for the same location; (2) a license for the same location is suspended; (3) a license for the same location has been revoked any time within the preceding five years; or (4) any person

Regulation Denial; Of License

2006-01-01T23:59:59.000Z

415

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

416

DOE Signs Advanced Enrichment Technology License and Facility Lease |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Enrichment Technology License and Facility Lease Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas centrifuge enrichment plant (GCEP) facilities in Piketon, OH for their American Centrifuge Plant. The Department of Energy (DOE) also granted a non-exclusive patent license to USEC for use of DOE's centrifuge technology for uranium enrichment at the plant, which will initiate the first successful deployment of advanced domestic enrichment technology in the

417

ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE  

Office of Legacy Management (LM)

COMMISSION COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE Pursuant to the rcgu!ations in Title 10, Code of Federal Regulations, Chapter 1, Part 40, application is hereby made for a license to receive, possess, use, transfer, deliver or import into the United Stat-, source material for the activity or activities described. 1. (check ooa) 2. NAME OF APPLICANT W. R. GRACE 6 Co. 0 (a) New Iicense 0 (b) Amendment to License No.- Davison Chemical Division STA-422 3. Q (c) Renewal of Licensr No. 0 (d) Previous License No. Pompton Plains, N. J. 4. ST,.TE THE AOORESS(ES) AT WHICH SOURCE MATERIAL WILL BE POSSESSED OR USED 868 Black Oak Ridge Road, Wayne, fi. J. a*ocY s up/'l File IF 5. BUSINESS OR OCCUPATION I 6. (a) IF APPLICANT IS AN INDIVIDUAL. STATE CITIZENSHIP

418

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

419

ECOdriving - Widespread Implementation for Learner Drivers and Licensed  

Open Energy Info (EERE)

ECOdriving - Widespread Implementation for Learner Drivers and Licensed ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Agency/Company /Organization: Austrian Energy Agency Focus Area: Fuels & Efficiency Topics: Best Practices Website: www.ecodrive.org/ The ECOWILL project aims to reduce carbon emissions by up to 8 Mt until 2015 by boosting the application of eco-driving across Europe. The project will roll out training programs for licensed drivers in 13 European countries. ECOWILL also promotes the education of eco-driving for learner drivers. This website provides information about eco-driving, including country-specific activities.

420

NATIONAL ENERGY TECHNOLOGY LABORATORY (NETL) LICENSE ON FEDERALLY ...  

The facts set forth in this request for license are within the knowledge of the requestor and are submitted with the intention that the Director of the NETL rely on ...

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Licensing arrangements and the development of the solar energy industry  

SciTech Connect

The process by which technology and information related to technology are transferred within industry is explored. Property rights in technology are part of the broader field of intellectual property. The general contours of legal protection for knowledge are explored. The four basic forms of intellectual property - patents, trade secrets (or know-how), trademarks, and copyrights - are covered in varying degrees of depth, depending on their relative applicability to the development of the solar industry. Once this background has been established, the legal aspects of licensing are examined. A license is a legal arrangement whereby a party (licensor) who controls the right to use an idea, invention, etc. shares the right to use the particular intellectual property with someone else (licensee). The advantages and disadvantages of licensing are described from the point of view of potential licensees and licensors. Barriers to licensing are discussed.

Green, M.

1979-06-01T23:59:59.000Z

422

Argonne Software Licensing: SAS4A/SASSYS-1  

BatPro software licensing ... SAS4A/SASSYS-1. The SAS4A/SASSYS-1 safety analysis code system is a simulation tool to perform deterministic transient safety analysis ...

423

Y-12 cleaning technology licensed by local engineering firm ...  

NLE Websites -- All DOE Office Websites (Extended Search)

cleaning technology ... Y-12 cleaning technology licensed by local engineering firm Posted: October 31, 2012 - 10:00am MK Technologies CEO and founder Mike Carroll and director of...

424

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues  

E-Print Network (OSTI)

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues Subcommittee Meeting Oct. 28, 2002 Livermore, CA #12;Idaho National Engineering and Environmental Laboratory · Approach to Regulatory Approval · Nuclear Design Codes · Summary #12;Idaho National Engineering

425

DOCKET NO. 40-9027 LICENSE NO. LICENSEE: SUBJECT:  

E-Print Network (OSTI)

License SMC-1562, covering storage of radioactive materials at both its Revere and Reading sites in Pennsylvania. Former ore processing at the Revere facility generated waste slag contaminated with uranium and thorium. In 1988, Cabot began onsite decommissioning

unknown authors

2001-01-01T23:59:59.000Z

426

ORNL, Da Vinci Sign Licensing Agreement | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Da Vinci Sign Licensing Agreement April 12, 2012 Seated are (l to r) ORNL Partnerships Director Tom Ballard and Da Vinci CEO Kent Froelund. Standing are (l to r) Johney Green, ORNL...

427

Software Development and Licensing at the Berkeley Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

explain software licensing and distribution options available for LBNL software and how Tech Transfer can help get the job done. If you are a software developer, or you supervise...

428

Working Copy Effective Date 10/08/08  

E-Print Network (OSTI)

Drawing · DOE/WIPP 90-45, Remote-Handled Transuranic Content Codes (RH- TRUCON) · Contact-HandledWorking Copy Effective Date 10/08/08 WP 08-PT.16 Revision 0 Shielded Container Assembly Handling #12;Working Copy Shielded Container Assembly Handling and Operation Manual WP 08-PT.16, Rev. 0 TABLE

429

Date OCE Title Presenter / Sponsoring  

E-Print Network (OSTI)

/20/12 Integrated Design and Operation of Smart Power Plants in the Modern Grid Era Dr. Debangsu Bhattacharyya 10 5:30PM G05 Evansdale Residential Complex 13 2/8/12 Advanced control and monitoring of plant growth

Mohaghegh, Shahab

430

,"U.S. Underground Natural Gas Storage - All Operators"  

U.S. Energy Information Administration (EIA) Indexed Site

U.S. Underground Natural Gas Storage - All Operators",3,"Annual",2012,"6301935" ,"Release Date:","9302013" ,"Next Release Date:","10312013" ,"Excel File Name:","ngstorsumd...

431

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-C 09-C NEPA ID No.: PXP-11-0006 Environmental Restoration & Waste Mgt. Activities, FY 2012-2013 Application of DOE NEPA Procedure: The Categorical Exclusions B6.1 and B6.2, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), apply to project number ESH-11-009-C. Rationale: The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), Pantex Site Office, proposes Environmental Restoration & Waste Management Activities for Fiscal Years 2012 and 2013 under project number ESH-11-009-C. These activities could include: Remedial actions, including design, construction, and operation of corrective measures (e.g., landfill covers and soil remediation activities);  Accelerated soil cleanups;

432

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-C 1-C NEPA ID No.: PXP-11-0002 HPFL Tank & Pump Replacement Application of DOE NEPA Procedure: Categorical Exclusion B1.15, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to this proposal. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activity described in NEPA Review Form (NRF) PXP-11-0002, which is hereby incorporated by reference. Rationale: The U.S. Department of Energy, National Nuclear Security Administration, proposes to construct and operate two new high pressure fire loop (HPFL) pump houses and tank facilities at the B&W Pantex Facility to replace aging existing facilities. Construction and staging areas would require approximately one acre of land disturbance for each facility.

433

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Nuclear Power Station (PNPS) License Renewal Application  

E-Print Network (OSTI)

information that supplemented the LRA as a result of operating experience (OE) and industry activities potentially relevant to aging management in several specific areas. This letter provides further clarification of that supplemental information to the LRA specific to the following areas which Entergy agreed to evaluate based upon communications with the NRC technical staff. 1. Aging management of neutron-absorbing materialsEntergy Nuclear Operations, Inc. Letter Number: 2.11.017 Pilgrim Nuclear Power Station Page 2 2. Inspection of buried pipe and tanks 3. Aging management of low voltage cables 4. Inspection of containment coatings 5. Metal fatigue NUREG/CR-6260 A new regulatory commitment is provided in the PNPS License Renewal Commitment List as

Stephen J. Bethay

2011-01-01T23:59:59.000Z

434

Page 1 of 22 Building Num: Date  

E-Print Network (OSTI)

Check List Page 1 of 22 Building Num: Date: Compressed Gases/WeldingChecklist Title: Action stored away from flammable materials? 1910.252(a)(2)(i) #12;Check List Page 2 of 22 Building Num: Date)(D) Is the insulation material intact on welding machine rod holders? 1910.254(d)(9)(i) #12;Check List Page 3 of 22

Homes, Christopher C.

435

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2011 28, 2011 CX-007772: Categorical Exclusion Determination Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Idaho Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007771: Categorical Exclusion Determination Nuclear Energy University Programs Minor Reactor Upgrade Request for Enhancement of Safety and Operational Monitoring Systems and Research Capabilities of the Ohio State University Nuclear Reactor Laboratory CX(s) Applied: B2.2 Date: 11/28/2011 Location(s): Ohio Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007770: Categorical Exclusion Determination Meeting Nuclear Uniform Curriculum Program Requirements with Equipment Investments - Lakeshore Technical College

436

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 CX-009659: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B5.1 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 5, 2012 CX-009658: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Small-Scale Research and Development, Laboratory Operations, and Pilot Projects under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B3.6 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 5, 2012 CX-009657: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Site

437

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-C 3-C NEPA ID No.: PXP-10-0007 Demolition of Buildings 11-10 and 11-30 Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Buildings 11-10 and 11-30 at the Pantex Plant. The overall objectives are to reduce Plant maintenance costs and reduce the Pantex Plant footprint by 3,144 square feet. Building 11-10 is approximately 929 square feet, single story, slab on grade, brick structure with a shingle roof. The interior of the building consists of only two rooms separated by a masonry wall. An asbestos

438

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D&D-10-001-C D&D-10-001-C NEPA ID No. PXP-10-0001 Amendment No. 10-010 Decontamination & Demolition of Residential and Farm Structures Application of DOE NEPA Procedure: Categorical Exclusions B1.23 and B6.1(c), Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), apply to the proposed activities. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activities described in Amendment No. 10-010 of NEPA Review Form (NRF) PXP-10-0001. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), recently acquired 1,526 acres of land to allow access for environmental monitoring and implementation of institutional controls. This property contains two homesteads - the former

439

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-C 4-C NEPA ID No.: PXP-10-0008 Demolition of Building 12-2B Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Building 12-2B and reduce the Pantex Plant footprint by 3,181 square feet. Project tasks include preparing and approving Planning Documents, removing building furnishings and contents, cutting, capping, and rerouting utilities associated with the structure, razing the structure, reworking/closing masonry wall at door opening, recycling uncontaminated concrete and metal, disposing of waste, and backfilling and restoring the area

440

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D&D-10-003-C D&D-10-003-C NEPA Amendment No.: 11-002 Demolition of Buildings 11-10 and 11-30 Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposed to demolish Buildings 11-10 and 11-30 at the Pantex Plant, as described in NEPA Review Form (NRF) No. PXP-10-0007, which is hereby incorporated by reference. While removing the asphalt from the concrete slab at Building 11-30 during demolition, unknown concrete sumps, manholes, and drainage troughs were discovered. Removal of the sumps, manholes, and drainage troughs has been added to the scope of project no. D&D-10-003-

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

442

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2010 10, 2010 CX-002349: Categorical Exclusion Determination Operations Systems Development and Integration CX(s) Applied: B1.7 Date: 05/10/2010 Location(s): Amarillo, Texas Office(s): NNSA-Headquarters, Pantex Site Office May 10, 2010 CX-002372: Categorical Exclusion Determination Building 17 and 19 Utility Meter Install CX(s) Applied: B1.15, B2.2 Date: 05/10/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory May 10, 2010 CX-007160: Categorical Exclusion Determination Pinnacle Peak Substation Coupling Capacitor Voltage Transformer Installation CX(s) Applied: B4.6 Date: 05/10/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region May 10, 2010 CX-007155: Categorical Exclusion Determination

443

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6 Date: 10/18/2010 Location(s): Reno, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004290: Categorical Exclusion Determination Greenfield Community College - Geothermal Project CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

444

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2012 15, 2012 CX-008946: Categorical Exclusion Determination Novel Supercritical Carbon Dioxide Power Cycle Utilizing Pressurized Oxy-Combustion in Conjunction... CX(s) Applied: A9 Date: 08/15/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory August 15, 2012 CX-008988: Categorical Exclusion Determination The Institute for Energy, Environment, and Sustainability CX(s) Applied: A9, B5.16 Date: 08/15/2012 Location(s): Kansas Offices(s): Golden Field Office August 15, 2012 CX-009115: Categorical Exclusion Determination Basin Modifications to Receive Research Fuel CX(s) Applied: B2.5 Date: 08/15/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 14, 2012 CX-008895: Categorical Exclusion Determination California-City-Yorba Linda

445

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 CX-006072: Categorical Exclusion Determination Disconnection of Utilities CX(s) Applied: B1.27 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 20, 2011 CX-006071: Categorical Exclusion Determination Relocation and Operation of Machinery and Equipment CX(s) Applied: B1.31 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 20, 2011 CX-006068: Categorical Exclusion Determination Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 17, 2011 CX-006093: Categorical Exclusion Determination Missouri Independent Energy Efficiency Program: Onesteel Grinding Systems -

446

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-007476: Categorical Exclusion Determination CEDF - Renewable Energy Program CX(s) Applied: B5.18 Date: 12/12/2011 Location(s): Vermont Offices(s): National Energy Technology Laboratory December 9, 2011 CX-007654: Categorical Exclusion Determination Install Formed Core Sampler in Saltstone Disposal Facility Vault 2 CX(s) Applied: B6.3 Date: 12/09/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office December 9, 2011 CX-007487: Categorical Exclusion Determination City of Las Vegas Electric Vehicle Program CX(s) Applied: B5.23 Date: 12/09/2011 Location(s): Nevada Offices(s): National Energy Technology Laboratory December 9, 2011 CX-007486: Categorical Exclusion Determination Clean Energy Coalition - Michigan Green Fleets CX(s) Applied: B5.23

447

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 3, 2013 June 3, 2013 CX-010527: Categorical Exclusion Determination Renovations and Maintenance Activities for Buildings, Structures CX(s) Applied: B1.3 Date: 06/03/2013 Location(s): Illinois Offices(s): Ames Site Office June 3, 2013 CX-010526: Categorical Exclusion Determination Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Illinois Offices(s): Ames Site Office June 3, 2013 CX-010512: Categorical Exclusion Determination Blackfeet Energy Efficiency Retrofits CX(s) Applied: B5.1 Date: 06/03/2013 Location(s): Montana Offices(s): Golden Field Office June 3, 2013 CX-010507: Categorical Exclusion Determination Development and Demonstration of Smart Grid Inverters for High-Penetration Photovoltaic Applications

448

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2009 9, 2009 CX-000177: Categorical Exclusion Determination Ohio County Franklin CX(s) Applied: A9, A11 Date: 11/09/2009 Location(s): Franklin County, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 9, 2009 CX-000280: Categorical Exclusion Determination Smoking Shelters CX(s) Applied: B1.5 Date: 11/09/2009 Location(s): Idaho Office(s): Idaho Operations Office, Nuclear Energy November 9, 2009 CX-000047: Categorical Exclusion Determination Tempe's Consultants and Studies, Revolving Loan Program, Lighting/Heating, Ventilating, and Air Conditioning/Streetlight Retrofits, Audits, and Solar Photovoltaic CX(s) Applied: B5.1, B1.32, B2.5, A9, A11 Date: 11/09/2009 Location(s): Tempe, Arizona Office(s): Energy Efficiency and Renewable Energy

449

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 CX-006520: Categorical Exclusion Determination High Energy Density Distributed Hydrostatic Direct Drive for Large Wind Turbine and Marine Hydro-Kinetic Device Applications CX(s) Applied: A9 Date: 08/16/2011 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 16, 2011 CX-006513: Categorical Exclusion Determination Novel Low Cost, High Reliability Wind Turbine Drivetrain CX(s) Applied: A9 Date: 08/16/2011 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 16, 2011 CX-006875: Categorical Exclusion Determination Center for Integrated Nanotechnologies Integration Laboratories: PH3 Operations CX(s) Applied: B3.6 Date: 08/16/2011 Location(s): Albuquerque, New Mexico

450

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: Categorical Exclusion Determination 488: Categorical Exclusion Determination Public Commuter Bike Station (and Cycling Initiative) CX(s) Applied: A11, B5.1 Date: 04/07/2010 Location(s): Saint Louis, Missouri Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 7, 2010 CX-002551: Categorical Exclusion Determination Replace Defense Waste Processing Facility Argon Tank CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 7, 2010 CX-001492: Categorical Exclusion Determination City of Saint Louis Missouri Statement of Work and All Activities Excluding Bike Station Project CX(s) Applied: A9, A11, B5.1 Date: 04/07/2010 Location(s): St. Louis, Missouri Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

451

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22: Categorical Exclusion Determination 22: Categorical Exclusion Determination Mulberry Grove Geo-Thermal Installation CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Mulberry Grove, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 28, 2010 CX-002547: Categorical Exclusion Determination Bubbler Upgrade Support - Defense Waste Processing Facility Water Separation from Decon Frit Solution CX(s) Applied: B1.3 Date: 04/28/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 28, 2010 CX-002175: Categorical Exclusion Determination U tu Utu Gwaitu Paiute Tribe Energy and Conservation Strategy and Implementation Plan CX(s) Applied: B2.5, A9, A11, B5.1 Date: 04/28/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy

452

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 CX-009331: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations Phase II CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): New Jersey Offices(s): National Energy Technology Laboratory September 26, 2012 CX-009433: Categorical Exclusion Determination Center for Biomass Utilization Renewal of Grant CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): North Dakota, Minnesota Offices(s): Golden Field Office September 25, 2012 CX-009242: Categorical Exclusion Determination Development of Light Water Reactor Fuels with Enhanced Accident Tolerance - AREVA Federal Services LLC CX(s) Applied: B3.6, B3.15 Date: 09/25/2012 Location(s): Florida, Wisconsin Offices(s): Nuclear Energy September 25, 2012 CX-009241: Categorical Exclusion Determination

453

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2013 May 30, 2013 CX-010215: Categorical Exclusion Determination Laufer Wind Group National Wind Technology Center Structure Lighting Tests CX(s) Applied: B1.31, B5.15 Date: 05/30/2013 Location(s): Colorado Offices(s): Golden Field Office May 30, 2013 CX-010483: Categorical Exclusion Determination Man Hole Cover Assembly Replacement CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2013 CX-010508: Categorical Exclusion Determination Cloud County Community College Wind Turbine CX(s) Applied: A9, A11, B3.14 Date: 05/29/2013 Location(s): Kansas Offices(s): Golden Field Office May 29, 2013 CX-010480: Categorical Exclusion Determination Development of a Multi-User Network Testbed for Wide-Area Monitoring and

454

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-002268: Categorical Exclusion Determination From Sensing to Enhancing the Brain Processes CX(s) Applied: B3.12 Date: 02/25/2010 Location(s): Albuquerque, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office February 24, 2010 CX-006661: Categorical Exclusion Determination Repair Flowline at 83-AX-4 CX(s) Applied: B5.2, B5.4 Date: 02/24/2010 Location(s): Casper, Wyoming Office(s): RMOTC February 24, 2010 CX-001126: Categorical Exclusion Determination 183-2C Removal of Switchgear Cubicle CX(s) Applied: B4.10 Date: 02/24/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2010 CX-000907: Categorical Exclusion Determination Improved Design Tools for Surface Water and Standing Column Well Heat Pump

455

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2012 22, 2012 CX-008535: Categorical Exclusion Determination King County Biogas and Nutrient Reduction CX(s) Applied: A9 Date: 05/22/2012 Location(s): Washington Offices(s): Golden Field Office May 22, 2012 CX-008533: Categorical Exclusion Determination 45-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project) CX(s) Applied: B5.15 Date: 05/22/2012 Location(s): Oregon Offices(s): Golden Field Office May 21, 2012 CX-008732: Categorical Exclusion Determination Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade CX(s) Applied: B1.31 Date: 05/21/2012 Location(s): Idaho Offices(s): Idaho Operations Office

456

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003666: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 07/27/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 27, 2010 CX-003247: Categorical Exclusion Determination Alaska-Tribe-Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/27/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 27, 2010 CX-003503: Categorical Exclusion Determination Water and Energy Emergency End Use Demand Management Measures CX(s) Applied: A1, A9, A11, B5.1 Date: 07/27/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett

457

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2010 25, 2010 CX-004445: Categorical Exclusion Determination Waste Treatment Plant Secondary Waste Radioactive Fluidized Bed Steam Reforming (Module A) CX(s) Applied: B3.6 Date: 10/25/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 25, 2010 CX-004349: Categorical Exclusion Determination Near Zero Carbon Footprint Energy Creation through Thermal Oxidation CX(s) Applied: A9, B3.6 Date: 10/25/2010 Location(s): Allentown, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 25, 2010 CX-004332: Categorical Exclusion Determination Geothermal Incentive Program - Old Lyme High School Geothermal CX(s) Applied: A9, B5.1 Date: 10/25/2010 Location(s): Old Lyme, Connecticut Office(s): Energy Efficiency and Renewable Energy, National Energy

458

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-005444: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant: Electric and Hybrid Vehicle Incremental Cost Recovery CX(s) Applied: B5.1 Date: 03/22/2011 Location(s): Fairfax County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 22, 2011 CX-005547: Categorical Exclusion Determination Specific Manufacturing Capability (SMC) Incinerator and Propane Tank System Removal CX(s) Applied: B1.23 Date: 03/22/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office March 22, 2011 CX-005440: Categorical Exclusion Determination Rhode Island Non-utility Scale Renewable Energy Program CX(s) Applied: B5.1 Date: 03/22/2011 Location(s): North Kingstown, Rhode Island Office(s): Energy Efficiency and Renewable Energy, National Energy

459

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-002350: Categorical Exclusion Determination Ohio Advanced Transportation Partnership (OATP) CX(s) Applied: A7 Date: 05/11/2010 Location(s): Ohio Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 11, 2010 CX-002663: Categorical Exclusion Determination Solar-Assisted Electrical Vehicle Charging Stations CX(s) Applied: B5.1 Date: 05/11/2010 Location(s): Oak Ridge, Tennessee Office(s): Oak Ridge Office, Science May 11, 2010 CX-002662: Categorical Exclusion Determination Installation and Operation of Majorana Underground Electro-forming Research Project CX(s) Applied: B3.6 Date: 05/11/2010 Location(s): Lead, South Dakota Office(s): Oak Ridge Office, Science May 11, 2010 CX-002347: Categorical Exclusion Determination Activity 6.2.5 ? Outreach and Education for Hydrogen Production and

460

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 CX-010325: Categorical Exclusion Determination Thermogravimetric/Differential Scanning Calorimetric Measurements of Solid Materials CX(s) Applied: B3.6 Date: 04/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 10, 2013 CX-010196: Categorical Exclusion Determination B903 Renovation CX(s) Applied: B1.16, B1.29, B2.1, B2.5 Date: 04/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory April 10, 2013 CX-010093: Categorical Exclusion Determination Kesselring Site K&L Load Center Relocation Project CX(s) Applied: B1.15 Date: 04/10/2013 Location(s): New York Offices(s): Naval Nuclear Propulsion Program April 10, 2013 CX-010328: Categorical Exclusion Determination Dissolution of Sludge Constituents in Glycolate-containing 2H Evaporator

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2009 4, 2009 CX-000822: Categorical Exclusion Determination Ion Chromatographic Analysis of Environmental Samples CX(s) Applied: B3.6 Date: 11/24/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 24, 2009 CX-000099: Categorical Exclusion Determination Forest County Potawatomi Community Energy Efficiency Retrofits CX(s) Applied: B5.1, A9 Date: 11/24/2009 Location(s): Wisconsin Office(s): Energy Efficiency and Renewable Energy November 24, 2009 CX-000098: Categorical Exclusion Determination Churchill County's Heating, Ventilating, and Air Conditioning Retrofit CX(s) Applied: B5.1 Date: 11/24/2009 Location(s): Churchill County, Nevada Office(s): Energy Efficiency and Renewable Energy November 24, 2009 CX-000575: Categorical Exclusion Determination

462

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-005306: Categorical Exclusion Determination Revised Energy Efficiency and Conservation Strategy CX(s) Applied: B1.2, B1.32, B2.5, B5.1 Date: 03/03/2011 Location(s): Jupiter, Florida Office(s): Civilian Radioactive Waste Management, Energy Efficiency and Renewable Energy March 3, 2011 CX-005304: Categorical Exclusion Determination California-City-Simi Valley CX(s) Applied: A1, B2.5, B5.1 Date: 03/03/2011 Location(s): Simi Valley, California Office(s): Energy Efficiency and Renewable Energy March 2, 2011 CX-005488: Categorical Exclusion Determination Destructive Evaluation of Plutonium Storage Can Bundles CX(s) Applied: B3.6 Date: 03/02/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 2, 2011

463

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2013 14, 2013 CX-010282: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): New Jersey Offices(s): National Energy Technology Laboratory May 14, 2013 CX-010281: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: A9, B3.6 Date: 05/14/2013 Location(s): Kentucky Offices(s): National Energy Technology Laboratory May 13, 2013 CX-010397: Categorical Exclusion Determination Seismic Monitoring for Seismic Hazards Analyses CX(s) Applied: B3.1 Date: 05/13/2013 Location(s): Idaho Offices(s): Idaho Operations Office May 13, 2013 CX-010265: Categorical Exclusion Determination Validation Data for Light-Duty Fuel Cell Electric Vehicles

464

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2013 2, 2013 CX-010863: Categorical Exclusion Determination Thermal Diffusivity Evaluation CX(s) Applied: B3.6 Date: 07/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 1, 2013 CX-010679: Categorical Exclusion Determination Herbicide Application at Four Substations: Blythe, Knob, Parker, and Senator Wash Located in California during Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): California, California, California Offices(s): Western Area Power Administration-Desert Southwest Region July 1, 2013 CX-010678: Categorical Exclusion Determination Herbicide Application at 40 Substations Located in Arizona During Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona

465

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

883: Categorical Exclusion Determination 883: Categorical Exclusion Determination Procure and Install Analytical Chemistry Instrumentation, 773-A (B&C Wings) CX(s) Applied: B3.1 Date: 06/02/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 2, 2010 CX-002689: Categorical Exclusion Determination Fuels Research Lab at TA-35-455 CX(s) Applied: B3.6 Date: 06/02/2010 Location(s): New Mexico Office(s): Los Alamos Site Office June 2, 2010 CX-002712: Categorical Exclusion Determination Maryland City-Bowie CX(s) Applied: B1.32, B2.5, B3.6, A1, A9, A11, B5.1 Date: 06/02/2010 Location(s): Bowie, Maryland Office(s): Energy Efficiency and Renewable Energy June 2, 2010 CX-002469: Categorical Exclusion Determination Oklahoma State Energy Program American Recovery and Reinvestment Act - City

466

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-000889: Categorical Exclusion Determination Dissolution of Uranium and Plutonium Containing Residues from F and H Area CX(s) Applied: B3.6 Date: 02/12/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 12, 2010 CX-002614: Categorical Exclusion Determination Research and Education of Carbon Dioxide Separation from Coal Combustion Flue Gases with Regenerable Magnesium Solutions CX(s) Applied: B3.1, A9 Date: 02/12/2010 Location(s): Cincinnati, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory February 12, 2010 CX-002272: Categorical Exclusion Determination Carlsbad Programs Group, Building National Parks Highway B, Shop CX(s) Applied: B3.6 Date: 02/12/2010 Location(s): Carlsbad, New Mexico

467

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 14, 2011 November 14, 2011 CX-007807: Categorical Exclusion Determination Griffith Substation Transformer Addition CX(s) Applied: B4.6 Date: 11/14/2011 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region November 10, 2011 CX-007667: Categorical Exclusion Determination Federal Bureau of Investigations Radiological Dispersion Device Training CX(s) Applied: B1.2 Date: 11/10/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 10, 2011 CX-007703: Categorical Exclusion Determination Sheetak Inc. - Thermoelectric Reactors for Efficient Automotive Thermal Storage CX(s) Applied: B3.6 Date: 11/10/2011 Location(s): New York, Pennsylvania, Texas Offices(s): Advanced Research Projects Agency-Energy November 10, 2011

468

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 CX-007821: Categorical Exclusion Determination Routine Activities at the Site A/Plot M, Illinois, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): Illinois Offices(s): Legacy Management February 9, 2012 CX-007846: Categorical Exclusion Determination Texas - City - Mesquite CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 02/09/2012 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy February 9, 2012 CX-007961: Categorical Exclusion Determination Fabrication of Alloys With Trace Depleted Uranium in 1750 C Tube Furnace With Argon Cover in D-0142 CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 9, 2012 CX-007820: Categorical Exclusion Determination

469

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination Down Hole Seismic Source 68-SX-11 CX(s) Applied: B3.7, B5.12 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006664: Categorical Exclusion Determination Rocky Mountain Oilfield Testing Center Process Improvement Old Pipe Yard Clean Up

470

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-007082: Categorical Exclusion Determination Provide Telecommunications Cable to Buildings 6750 and 6753 CX(s) Applied: B1.7 Date: 06/09/2011 Location(s): Albuquerque, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office June 9, 2011 CX-007081: Categorical Exclusion Determination Installation of 7 New Storm Water Monitoring Stations CX(s) Applied: B3.1 Date: 06/09/2011 Location(s): Albuquerque, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office June 8, 2011 CX-006388: Categorical Exclusion Determination Installation of Water Jet Cutter into 210-S Machine Shop CX(s) Applied: B1.3 Date: 06/08/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 8, 2011 CX-006389: Categorical Exclusion Determination

471

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2012 11, 2012 CX-009078: Categorical Exclusion Determination Dismantle and removal (D&R) of Domestic Water (DW) & Process Water (PWS) heater tanks CX(s) Applied: B1.3 Date: 07/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 10, 2012 CX-008811: Categorical Exclusion Determination Utility Energy Service Contract Closed Loop Centrifugal Chiller at the Central Chilled Water Facility CX(s) Applied: B1.5, B2.1 Date: 07/10/2012 Location(s): New York Offices(s): Brookhaven Site Office July 10, 2012 CX-008523: Categorical Exclusion Determination Non-Hazardous Solid Waste Disposal Contract (Garbage Collection) CX(s) Applied: A1, A8, B1.3 Date: 07/10/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory July 10, 2012

472

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-006532: Categorical Exclusion Determination Evaluating and Commercializing a Solvent-Based Enhanced Oil Recovery Technology CX(s) Applied: B3.7 Date: 08/22/2011 Location(s): Lockhart, Texas Office(s): Fossil Energy, National Energy Technology Laboratory August 22, 2011 CX-006543: Categorical Exclusion Determination Building 40 New Video Surveillance CX(s) Applied: A11, B1.15, B2.3 Date: 08/22/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 22, 2011 CX-007076: Categorical Exclusion Determination Install New Power Poles in A & B Areas CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 22, 2011

473

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006069: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011

474

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2013 9, 2013 CX-009922: Categorical Exclusion Determination Fuel Cell Powered Airport Ground Support Equipment Deployment CX(s) Applied: A9, B5.1, B5.22 Date: 01/29/2013 Location(s): New York Offices(s): Golden Field Office January 29, 2013 CX-009913: Categorical Exclusion Determination Program year 2012 State Energy Program Formula Grants CX(s) Applied: A9, B5.1 Date: 01/29/2013 Location(s): Indiana Offices(s): Golden Field Office January 29, 2013 CX-010016: Categorical Exclusion Determination Energy Frontiers Research Center - Nanoscale Actinide Materials CX(s) Applied: B3.6 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 29, 2013 CX-009853: Categorical Exclusion Determination Development of Methods to Prohibit and Remediate Loss of Annular Isolation

475

PRECLOSURE CONSEQUENCE ANALYSES FOR LICENSE APPLICATION  

Science Conference Proceedings (OSTI)

Radiological consequence analyses are performed for potential releases from normal operations in surface and subsurface facilities and from Category 1 and Category 2 event sequences during the preclosure period. Surface releases from normal repository operations are primarily from radionuclides released from opening a transportation cask during dry transfer operations of spent nuclear fuel (SNF) in Dry Transfer Facility 1 (DTF 1), Dry Transfer Facility 2 (DTF 2), the Canister Handling facility (CHF), or the Fuel Handling Facility (FHF). Subsurface releases from normal repository operations are from resuspension of waste package surface contamination and neutron activation of ventilated air and silica dust from host rock in the emplacement drifts. The purpose of this calculation is to demonstrate that the preclosure performance objectives, specified in 10 CFR 63.111(a) and 10 CFR 63.111(b), have been met for the proposed design and operations in the geologic repository operations area. Preclosure performance objectives are discussed in Section 6.2.3 and are summarized in Tables 1 and 2.

S. Tsai

2005-01-12T23:59:59.000Z

476

Oil shale up-date  

SciTech Connect

The development of large domestic oil shale resources in an environmentally acceptable manner is technically feasible. Such development is approaching economic attractiveness. It is an essential step in attacking the major national problem: increasing oil imports. Several things have been impeding oil shale development. First, until recently there has been a lack of viable technology. Second, environmental regulations are becoming increasingly restrictive. These have become so unrealistic that the bare undeveloped ground in oil shale country fails to comply. Most of this area is now classified as a nonattainment area. The third reason is economic uncertainty. This relates to price and other governmental controls which make it impossible to predict future conditions with enough confidence to justify private investments. In an effort to overcome this uncertainty, while retaining the impeding controls, all types of governmental incentives and supports are being proposed by the Administration, the Congress, and the industry. This study highlights the current status of the more prominent technologies. It suggest that the next logical step in their advancement is the construction and operation of single full-size retorts or modules.

Pforzheimer, H.

1978-09-01T23:59:59.000Z

477

Department of Energy Files Motion to Withdraw Yucca Mountain License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Files Motion to Withdraw Yucca Mountain Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the Nation meets our long-term storage obligations for nuclear waste," said Department of Energy General Counsel Scott Blake Harris. "In light of the decision not to proceed with the Yucca Mountain nuclear waste repository, the President directed Secretary Chu to establish the Blue Ribbon Commission on America's

478

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

479

NETL: News Release - Successful Clean Coal Technology Licensed for  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2010 6, 2010 Successful Clean Coal Technology Licensed for Commercial Application DOE Receives First Repayment for Liquid Phase Methanol Process Development Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH(tm)) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

480

Argonne licenses diamond semiconductor discoveries to AKHAN Technologies |  

NLE Websites -- All DOE Office Websites (Extended Search)

licenses diamond semiconductor discoveries to AKHAN Technologies licenses diamond semiconductor discoveries to AKHAN Technologies By Joseph Bernstein * By Jared Sagoff * March 4, 2013 Tweet EmailPrint LEMONT, Ill. - The U.S. Department of Energy's Argonne National Laboratory announced today that the laboratory has granted AKHAN Technologies exclusive diamond semiconductor application licensing rights to breakthrough low-temperature diamond deposition technology developed by Argonne's Center for Nanoscale Materials (CNM). The Argonne-developed technology allows for the deposition of nanocrystalline diamond on a variety of wafer substrate materials at temperatures as low as 400 degrees Celsius. The combination of the Argonne's low-temperature diamond technology with AKHAN's Miraj Diamond(tm) process represents the state of the art in diamond semiconductor

Note: This page contains sample records for the topic "operation date license" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Electrical Energy Producer's License Tax (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Producer's License Tax (Montana) Energy Producer&#039;s License Tax (Montana) Electrical Energy Producer's License Tax (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue Each person or other organization engaged in the generation, manufacture, or production of electricity and electrical energy in the state of Montana,

482

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

483

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 CX-001501: Categorical Exclusion Determination Commercial Renewable Energy Systems - FLS Meadowood Garden Solar CX(s) Applied: B5.1 Date: 04012010 Location(s):...

484

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Non-Contaminating Cryogenic Fracturing Technology CX(s) Applied: B3.6 Date: 12202011 Location(s): Colorado Offices(s):...

485

High Precision Radiometric Dating of Sedimentary Materials  

SciTech Connect

To develop field, petrographic and geochemical criteria to allow high precision U-Pb dating of sedimentary minerals within rapidly deposited sequences of carbonate and clastic rocks.

Hanson, G. N.

2006-09-19T23:59:59.000Z

486

Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL  

E-Print Network (OSTI)

Feb 2003 Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL 1) Source: Bldg: ________________________________________ Disinfection? cc YES, Autoclaved (each container tagged with `Treated Biomedical Waste') cc YES, Chemical

Sinnamon, Gordon J.

487

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 2011 CX-006930: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09282011 Location(s): Torrance, Los Angeles...

488

ENERGY STAR Guide for Licensed Professionals | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Guide for Licensed Professionals Guide for Licensed Professionals Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

489

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

Not Available

1993-11-01T23:59:59.000Z

490

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-006384: Categorical Exclusion Determination Construction and Operation of a Cask Processing Enclosure at the Transuranic Waste Processing Center on the Oak Ridge Reservation, Lenoir City, Tennessee CX(s) Applied: B1.13, B3.1, B6.6 Date: 04/19/2011 Location(s): Lenoir City, Tennessee Office(s): Environmental Management, Oak Ridge Office April 19, 2011 CX-005769: Categorical Exclusion Determination Dismantle and Removal (D&R) and Enhance Chemical Cleaning (ECC) on Waste Tank 8F (General) CX(s) Applied: B1.28 Date: 04/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 18, 2011 CX-005630: Categorical Exclusion Determination South Carolina Clean Green Investment Incentives ? Solar Initiatives

491

Using neighbors to date web documents  

Science Conference Proceedings (OSTI)

Time has been successfully used as a feature in web information retrieval tasks. In this context, estimating a document's inception date or last update date is a necessary task. Classic approaches have used HTTP header fields to estimate a document's ... Keywords: link analysis, web dynamics, web information retrieval

Srgio Nunes; Cristina Ribeiro; Gabriel David

2007-11-01T23:59:59.000Z

492

The use for frequency-consequence curves in future reactor licensing  

E-Print Network (OSTI)

The licensing of nuclear power plants has focused until now on Light Water Reactors and has not incorporated systematically insights and benefits from Probabilistic Risk Assessment (PRA). With the goal of making the licensing ...

Debesse, Laurne

2007-01-01T23:59:59.000Z

493

DOE/EIS-0380: 2008 Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory Mitigation Action Plan (December 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Title: 2008 Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan U.S. Department of Energy Date: December 2008 Los Alamos National Laboratory, an affirmative action/equal opportunity employer, is operated by the Los Alamos National Security, LLC for the National Nuclear Security Administration of the U.S. Department of Energy under contract DE-AC52-06NA25396. By acceptance of this article, the publisher recognizes that the U.S. Government retains a nonexclusive, royalty-free license to publish or reproduce the published form of this contribution, or to allow others to do so, for U.S. Government purposes. Los Alamos National Laboratory requests that the publisher identify this

494

A Process for Reducing the Licensing Burden for New Products Containing Depleted Uranium  

NLE Websites -- All DOE Office Websites (Extended Search)

3-01 3-01 A Process for Reducing the Licensing Burden for New Products Containing Depleted Uranium Environmental Assessment Division Argonne National Laboratory Operated by The University of Chicago, under Contract W-31-109-Eng-38, for the United States Department of Energy Argonne National Laboratory, a U.S. Department of Energy Office of Science laboratory, is operated by The University of Chicago under contract W-31-109-Eng-38. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor The University of Chicago, nor any of their employees or officers, makes any warranty, express or implied, or assumes

495

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

496

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

497

Licensing sentence-internal readings in english: an experimental study  

Science Conference Proceedings (OSTI)

Adjectives of comparison (AOCs) like same, different and similar can compare two elements sentence-internally, i.e., without referring to any previously introduced element. This reading is licensed only if a semantically plural NP ... Keywords: Bayesian statistics, acceptability judgments, adjectives of comparison, distributivity, pluralities

Adrian Brasoveanu; Jakub Dotla?il

2011-12-01T23:59:59.000Z

498

Office of Information Technology University of Minnesota 1 Software Licenses  

E-Print Network (OSTI)

, visit the Change Management website. Scheduled Maintenance The schedule of OIT maintenance windows is published on the System Status page. Should maintenance be required outside of the scheduled maintenanceSoftwareLicenseServer. If the maintenance window extends beyond anticipated end time, the System Status page will be updated accordingly

Amin, S. Massoud

499

Radiation Protection and Licensing FNAL Radiation Physics Team  

E-Print Network (OSTI)

/replace philosophy 8. Remote Handling capabilities 9. Alignment and Stability 10. Radioactive off-gas (especially shielded repair cells · Need remote handling capability · Problems during lifting and moving are difficult. January 13, 2012 Radiation Protection and Licensing #12;11 Repair Cell and Remote Handling capabilities

McDonald, Kirk

500

Revised Industry Steam Generator Program Generic License Change Package  

E-Print Network (OSTI)

License Change Package for NRC review and endorsement. Industry events during the subsequent months have delayed the NRC review and presented an opportunity for the industry to improve the submittal. A summary of the major changes from the February submittal is provided in Enclosure 1. The resulting package (Enclosures 2 through 8), which supercedes the earlier version in its entirety, is enclosed for your endorsement. Although the events of the last ten months have resulted in some changes to the industry steam generator program guidance, the fundamental principles remain sound. Equally as important, the program has demonstrated its resiliency. The steam generator program guidance is designed to accommodate new knowledge and experience, and that is precisely what is occurring. The enclosed Generic License Change Package includes changes that reflect recent experience. In addition, the appropriate underlying technical documents are currently being revised or supplemental guidance is being developed as necessary to reflect new information. The industry and the NRC worked diligently to address the technical and licensing issues that ultimately resulted in the February 2000 version of the Steam Generator Program Generic License Change Package. Although these documents have been revised since the previous submittal, the differences do not represent a change in our position on the issues.

David J. Modeen; Mr. Samuel; J. Collins; U. S. Nuclear; Regulatory Commission; Xuo Mr; Samuel J. Collins

2000-01-01T23:59:59.000Z