Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Manhattan Project: Y-12 Operation, 1943-1944  

Office of Scientific and Technical Information (OSTI)

Alpha Racetrack, Y-12 Electromagnetic Plant, Oak Ridge Y-12: OPERATION Alpha Racetrack, Y-12 Electromagnetic Plant, Oak Ridge Y-12: OPERATION (Oak Ridge: Clinton, 1943-1944) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 During the summer and fall of 1943, the Y-12 Electromagnetic Plant at Oak Ridge began to take shape. The huge buildings to house the operating equipment were readied as manufacturers began delivering everything from electrical switches to motors, valves, and tanks. While construction and outfitting proceeded, almost 5,000 operating and maintenance personnel were hired and trained. Then, between October and mid-December, Y-12 paid the price for being a new technology that had not been put through its paces in a pilot plant. Vacuum tanks in the first Alpha racetrack leaked and shimmied out of line due to magnetic pressure, welds failed, electrical circuits malfunctioned, and operators made frequent mistakes. Most seriously, the magnet coils shorted out because of rust and sediment in the cooling oil.

2

Manhattan Project: Hanford Becomes Operational, 1943-1944  

Office of Scientific and Technical Information (OSTI)

F Reactor Plutonium Production Complex at Hanford, 1945 HANFORD BECOMES OPERATIONAL F Reactor Plutonium Production Complex at Hanford, 1945 HANFORD BECOMES OPERATIONAL (Hanford Engineer Works, 1943-1944) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 The plutonium production facilities at the Hanford Engineer Works took shape with the same wartime urgency as did the uranium facilities at Oak Ridge. In February 1943, Colonel Matthias returned to the location he had helped select the previous December and set up a temporary headquarters. In late March, Matthias received his assignment. The three water-cooled production reactor (piles), designated by the letters B, D, and F, would be built about six miles apart on the south bank of the Columbia River. The four chemical separation plants would be built in pairs at two sites nearly ten miles south of the piles. A facility to produce slugs and perform tests would be approximately twenty miles southeast of the separation plants near Richland. Temporary quarters for construction workers would be put up at the Hanford town site, while permanent facilities for other personnel would be located down the road in Richland, safely removed from the production and separation plants. Life at Hanford would soon come to resemble that of the other "atomic boomtowns" of the Manhattan Project, Los Alamos and Oak Ridge.

3

Manhattan Project: Working K-25 into the Mix, 1943-1944  

Office of Scientific and Technical Information (OSTI)

K-25 Gaseous Diffusion Plant, Oak Ridge WORKING K-25 INTO THE MIX K-25 Gaseous Diffusion Plant, Oak Ridge WORKING K-25 INTO THE MIX (Oak Ridge: Clinton, 1943-1944) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 In 1941 and 1942, gaseous diffusion had been considered by many as the most promising method of enriching uranium. The British in the influential 1941 MAUD Report had advocated the use of gaseous diffusion alone, and the 1942 Lewis committee placed it first among isotope separation methods. Despite the soundness of the theory, the process had yet to produce any samples of enriched uranium when the K-25 Gaseous Diffusion Plant was authorized in late 1942.

4

NUCLEAR POWER AND RESEARCH REACTORS 1939 1942 1943 1944  

E-Print Network (OSTI)

#12;#12;11 #12;2 NUCLEAR POWER AND RESEARCH REACTORS 1939 1942 1943 1944 Nuclear fission discovered Oak Ridge selected as site for World War II Manhattan Project First sustained and controlled nuclear 430 nuclear power reactors are operating in the world, and 103 nuclear power plants produce 20

Pennycook, Steve

5

Manhattan Project: Basic Research at Los Alamos, 1943-1944  

Office of Scientific and Technical Information (OSTI)

Norris Bradbury, Robert Oppenheimer, Richard Feynman, Enrico Fermi, and others, Los Alamos, 1946 BASIC RESEARCH AT LOS ALAMOS Norris Bradbury, Robert Oppenheimer, Richard Feynman, Enrico Fermi, and others, Los Alamos, 1946 BASIC RESEARCH AT LOS ALAMOS (Los Alamos: Laboratory, 1943-1944) Events > Bringing It All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 Enrico Fermi The first few months at Los Alamos were occupied with briefings on nuclear physics for the technical staff and with planning research priorities and organizing the laboratory. Leslie Groves called once again on Warren Lewis to head a committee, this time to evaluate the Los Alamos program. The committee's recommendations resulted in the coordinated effort envisioned by those who advocated a unified laboratory for bomb research. Enrico Fermi (left) took control of critical mass experiments and standardization of measurement Hans Bethe techniques. Plutonium purification work, begun at the Met Lab, became high priority at Los Alamos, and increased attention was paid to metallurgy. The committee also recommended that an engineering division be organized to collaborate with physicists on bomb design and fabrication. The laboratory was thus organized into four divisions: theoretical (Hans A. Bethe, right); experimental physics (Robert F. Bacher); chemistry and metallurgy (Joseph W. Kennedy); and ordnance (Navy Captain William S. "Deke" Parsons). Like other Manhattan Project installations, Los Alamos soon began to expand beyond initial expectations.

6

Manhattan Project: Early Bomb Design, Los Alamos: Laboratory, 1943-1944  

Office of Scientific and Technical Information (OSTI)

Little Boy at Tinian Island, August 1945 EARLY BOMB DESIGN Little Boy at Tinian Island, August 1945 EARLY BOMB DESIGN (Los Alamos: Laboratory, 1943-1944) Events > Bringing it All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 Early work on the design of the atomic bomb began even as scientists continued to arrive at Los Alamos throughout 1943. The properties of uranium were reasonably well understood, those of plutonium less so, and knowledge of fission explosions entirely theoretical. That 2.2 secondary neutrons were produced when uranium-235 fissioned was accepted, but while Glenn Seaborg's team had proven in March 1941 that plutonium underwent neutron-induced fission, it was not known yet if plutonium released secondary neutrons during bombardment. Further, the exact sizes of the "cross sections" of various fissionable substances had yet to be determined in experiments using the various particle accelerators then being shipped to Los Alamos. The theoretical consensus was that fission Fission chain reaction chain reactions (left) did take place with sufficient speed to produce powerful releases of energy (and not simply result in the explosion of the critical mass itself), but only experiments could test this theory. The optimum size of the critical mass remained to be established, as did the optimum shape. When enough data were gathered to establish optimum critical mass, optimum effective mass still had to be determined. That is, it was not enough simply to start a chain reaction in a critical mass; it was necessary to start one in a mass that would release the greatest possible amount of energy before it was destroyed in the explosion.

7

Manhattan Project: DuPont and Hanford, Hanford Engineer Works, 1942  

Office of Scientific and Technical Information (OSTI)

The president of DuPont, Walter Carpenter, with Generals Levin H. Campbell, Everett Hughes, and Charles T. Harris. DUPONT AND HANFORD The president of DuPont, Walter Carpenter, with Generals Levin H. Campbell, Everett Hughes, and Charles T. Harris. DUPONT AND HANFORD (Hanford Engineer Works, 1942) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 The scientists of the Met Lab had the technical expertise to design a production pile, but construction and management on an industrial scale required an outside contractor. The DuPont Corporation was an ideal candidate, but the giant chemical firm was hesitant to join the project due to concern over accusations that it had profiteered during World War I. On October 3, 1942, DuPont agreed to design and build the chemical separation plant for the production pile facility then planned for Oak Ridge. Leslie Groves tried to entice further DuPont participation by having the firm prepare an appraisal of the pile (reactor) project and by placing three DuPont staff members on the Lewis Committee. DuPont ultimately agreed to become the primary contractor for plutonium-related work, but because of continuing sensitivity about its public image its contract called for a total payment of only dollar over actual costs. In addition, DuPont vowed to stay out of the bomb business after the war and offered all patents to the United States government.

8

INL @ work: Nuclear Reactor Operator  

ScienceCinema (OSTI)

INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

Russell, Patty

2013-05-28T23:59:59.000Z

9

From Bataan to Tokyo: Diary of a Filipino Student in Wartime Japan, 1943-1944  

E-Print Network (OSTI)

of confinement started. The start of my vacation was not so good as I was sick with fever from the afternoon of graduation until Tuesday morning. On Friday, July 2, 1943, I visited the Benedictine Fathers at San Beda. Father Eladio San Juan gave me a... that elongate into eaves. People continuously visit this shrine to pay homage to the builder of New Japan, Emperor Meiji. Our visit to the Yasukuni Shrine was postponed due to the heavy rain. This p.m. we went to the St. Luke's International Medical Center...

De Asis, Leocadio; Goodman, Grant K.

1979-01-01T23:59:59.000Z

10

Manhattan Project: The Navy and Thermal Diffusion, 1944  

Office of Scientific and Technical Information (OSTI)

Diffusion columns, S-50 Thermal Diffusion Plant, Oak Ridge, 1945. THE NAVY AND THERMAL DIFFUSION Diffusion columns, S-50 Thermal Diffusion Plant, Oak Ridge, 1945. THE NAVY AND THERMAL DIFFUSION (Oak Ridge: Clinton, 1944) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 As problems with both Y-12 and K-25 reached crisis proportions in spring and summer 1944, the Manhattan Project received help from an unexpected source: the United States Navy. President Roosevelt had instructed that the atomic bomb effort be an Army program and that the Navy be excluded from deliberations. Navy research on atomic power, conducted primarily for submarines, received no direct aid from Leslie Groves, who, in fact, was not up-to-date on the state of Navy efforts when he received a letter on the subject from Robert Oppenheimer late in April 1944.

11

Manhattan Project: The Uranium Path to the Bomb, 1942-1944  

Office of Scientific and Technical Information (OSTI)

Alpha Racetrack, Y-12 Electromagnetic Plant, Oak Ridge THE URANIUM PATH TO THE BOMB Alpha Racetrack, Y-12 Electromagnetic Plant, Oak Ridge THE URANIUM PATH TO THE BOMB (1942-1944) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 The uranium path to the atomic bomb ran through Oak Ridge, Tennessee. Only if the new plants built at Oak Ridge produced enough enriched uranium-235 would a uranium bomb be possible. General Groves placed two methods into production: 1) electromagnetic, based on the principle that charged particles of the lighter isotope would be deflected more when passing through a magnetic field; and 2) gaseous diffusion, based on the principle that molecules of the lighter isotope, uranium-235, would pass more readily through a porous barrier. Full-scale electromagnetic and gaseous diffusion production plants were built at Oak Ridge at sites designated as "Y-12" and "K-25", respectively.

12

Manhattan Project: Y-12 Construction, 1943  

Office of Scientific and Technical Information (OSTI)

Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION (Oak Ridge: Clinton, 1943) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 Groundbreaking for the Alpha plant of the Y-12 Electromagnetic Plant took place at Oak Ridge on February 18, 1943 (right). Soon blueprints could not be produced fast enough to keep up with construction as Stone & Webster labored to meet Leslie Groves's deadline. The Beta facility was actually begun before formal authorization. While laborers were aggressively recruited, there was always a shortage of workers skilled Y-12 construction, Oak Ridge enough to perform jobs according to the rigid specifications. (A further complication was that some tasks could be performed only by workers with security clearances.) Huge amounts of material had to be obtained (38 million board feet of lumber, for instance), and the magnets needed so much copper for windings that the Army had to borrow almost 15,000 tons of silver bullion from the United States Treasury to fabricate into strips and wind on to coils as a substitute for copper. Treasury silver was also used to manufacture the busbars that ran around the top of the racetracks.

13

Operational efficiency through resource planning optimization and work process improvement  

E-Print Network (OSTI)

This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

Balwani, Siddharth (Siddharth Vashdev)

2012-01-01T23:59:59.000Z

14

Work Cost of Thermal Operations in Quantum and Nano Thermodynamics  

E-Print Network (OSTI)

Adopting a resource theory framework of thermodynamics for quantum and nano systems pioneered by Janzing et al. [Int. J. Th. Phys. 39, 2717 (2000)], we formulate the cost in useful work of transforming one resource state into another as a linear program of convex optimization. This approach is based on the characterization of thermal quasiorder given by Janzing et al. and later by Horodecki and Oppenheim [Nat. Comm. 4, 2059 (2013)]. Both characterizations are related to an extended version of majorization studied by Ruch, Schranner, and Seligman under the name mixing distance [J. Chem. Phys. 69, 386 (1978)].

Joseph M. Renes

2014-02-14T23:59:59.000Z

15

Analysis of clerical operation by application of work sampling  

E-Print Network (OSTI)

praotioes?nd avoidable del?ys, An investigation of tbs reliability and validity of the retie-delay metbcd vas sc?de by D, S, Carrell? Industrial Engineer for Deere and Company? and R+ N? Barnes, Professor of Engineering at the Cniversity of C... to the work place, ayout, Ele:. ont gl is at the 11o, 1 Body Press. El. mont g2 is at the No. 2 Mushrocm Press. Elem=nt P3 is at the No, 3 Mushroom Press, Element Pl+ i= the act of disposing or etting a uniform at; any time, Element g5 will tak place...

Springer, Joy Victor

2012-06-07T23:59:59.000Z

16

Solution of basic operational problems of water-development works at the Votkinsk hydroproject  

SciTech Connect

Basic operational problems of water-development works at the Votkinsk HPP are examined. Measures for restoration of normal safety conditions for the water-development works at the HPP, which had been taken during service, are presented.

Deev, A. P.; Borisevich, L. A.; Fisenko, V. F. [Votkinsk Branch of the JSC 'RusGidro,' Chaikovskii (Russian Federation)

2012-11-15T23:59:59.000Z

17

U.S. CMS - U.S. CMS @ Work - Detector Commissioning and Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

USCMS Detector Ops USCMS Detector Ops Detector Commissioning and Operations In This Section: LHC@ FNAL Remote Operations Center Remote Operations Center at Fermilab Global Run Contact The US CMS Operations Group works very closely with the main CMS commissioning and operations team to develop and maintain the many online detector monitoring tools that make remote operations possible for hundreds of collaborators. One of the group's major roles focuses on coordinating the operation of the Remote Operations Center (ROC) at Fermilab with CMS operations at CERN. The main CMS control room resides at Point 5. Because this is a half-hour drive from the main laboratory campus in Meyrin, the experiment built the CMS Centre, a remote operations center on CERN's main site. The US CMS group therefore makes sure that operations remain seamless between the ROC

18

Comparing cultural profiles of MCR operators with those of non-MCR operators working in domestic Nuclear Power Plants  

Science Journals Connector (OSTI)

Abstract Operation experience of complex socio-technical systems such as Nuclear Power Plants (NPPs) shows that most significant events are attributable to human error. Thus, various kinds of Human Reliability Analysis (HRA) techniques were used to manage human error for safety-critical tasks. However, a lack of available HRA data is a critical issue in conducting an HRA. For this reason, many researchers have tried to provide HRA data extracted from simulated emergency conditions. Unfortunately, it is still doubtful to directly use these HRA data because different operational cultures may result in different human performances even under a similar task context. From this concern, previous studies claimed that Main Control Room (MCR) operators working in different \\{NPPs\\} share very similar cultural profile. In order to confirm this claim, the culture profiles of operating personnel (i.e., non-MCR and MCR operators) working in domestic \\{NPPs\\} are compared. As a result, although some discrepancies are observed, it is positive to say that operating personnel of \\{NPPs\\} share similar cultural profiles to some extent. This result can be regarded as the first step to provide technical underpinnings that are helpful for understanding human performance data collected from different countries.

Jinkyun Park; Wondea Jung

2015-01-01T23:59:59.000Z

19

work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE THE U.S. DEPARTMENT OF ENERGY'S WORKING CAPITAL FUND U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES OCTOBER 1998 AUDIT REPORT CR-B-99-01 MEMORANDUM FOR THE DIRECTOR, BUSINESS MANAGEMENT STAFF FROM: William S. Maharay Acting Manager, Capital Regional Audit Office, Office of Inspector General SUBJECT: INFORMATION : Audit Report on the Department's Working Capital Fund BACKGROUND The Department established the Working Capital Fund (Fund) in January 1996 as a financial management tool for charging the costs of common services provided at Headquarters to Departmental program offices. The objectives in establishing the Fund were to increase efficiency of the Department's operations, improve management of administrative services

20

Manhattan Project: Production Reactor (Pile) Design, Met Lab, 1942  

Office of Scientific and Technical Information (OSTI)

Schematic of the X-10 Graphite Reactor, Oak Ridge PRODUCTION REACTOR (PILE) DESIGN Schematic of the X-10 Graphite Reactor, Oak Ridge PRODUCTION REACTOR (PILE) DESIGN (Met Lab, 1942) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 By 1942, scientists had established that some of the uranium exposed to radioactivity in a reactor (pile) would eventually decay into plutonium, which could then be separated by chemical means from the uranium. Important theoretical research on this was ongoing, but the work was scattered at various universities from coast to coast. In early 1942, Arthur Compton arranged for all pile research to be moved to the Met Lab at the University of Chicago.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems  

E-Print Network (OSTI)

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

1996-01-01T23:59:59.000Z

22

,"U.S. Working Storage Capacity at Operable Refineries"  

U.S. Energy Information Administration (EIA) Indexed Site

Storage Capacity at Operable Refineries" Storage Capacity at Operable Refineries" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Working Storage Capacity at Operable Refineries",28,"Annual",2013,"6/30/1982" ,"Release Date:","6/21/2013" ,"Next Release Date:","6/20/2014" ,"Excel File Name:","pet_pnp_capwork_dcu_nus_a.xls" ,"Available from Web Page:","http://www.eia.gov/dnav/pet/pet_pnp_capwork_dcu_nus_a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.gov"

23

Manhattan Project: Y-12: Design, 1942-1943  

Office of Scientific and Technical Information (OSTI)

Ernest Lawrence slumps in his chair from fatigue in front of a cyclotron control panel while conducting calutron-related experiments, Berkeley, 1943. Y-12: DESIGN Ernest Lawrence slumps in his chair from fatigue in front of a cyclotron control panel while conducting calutron-related experiments, Berkeley, 1943. Y-12: DESIGN (Oak Ridge: Clinton, 1942-1943) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 Although the Lewis Report had placed gaseous diffusion ahead of the electromagnetic approach, many were still betting in early 1943 that Ernest Lawrence (right) and his "calutron" would eventually predominate. Lawrence and his laboratory of mechanics at the University of California, Berkeley, continued to experiment with the giant 184-inch cyclotron magnet, trying to reach a consensus on which shims, sources, and Electromagnetic method for the enrichment of uranium collectors to incorporate into the Y-12 Electromagnetic Plant that was to be built at Oak Ridge. Research on magnet size and placement and beam resolution led Lawrence and his group in fall 1942 to propose an arrangement of huge electromagnetic coils connected by a bus bar in an oval racetrack configuration, as seen from above. Forty-eight gaps in the racetrack between the coils would each contain two vacuum tanks. With two racetracks per building, ten buildings would be necessary to provide the estimated 2,000 sources and collectors needed to separate 100 grams of uranium-235 daily. The Berkeley researchers hoped that improvements in calutron design, or placing multiple sources and collectors in each tank, might increase efficiency and reduce the number of tanks and buildings required, but experimental results were inconclusive even as Stone & Webster of Boston, the Y-12 contractor at Oak Ridge, prepared to break ground.

24

Manhattan Project: Oak Ridge and Hanford Come Through, 1944-1945  

Office of Scientific and Technical Information (OSTI)

Y-12 Plant, Oak Ridge, 1944 OAK RIDGE AND HANFORD COME THROUGH Y-12 Plant, Oak Ridge, 1944 OAK RIDGE AND HANFORD COME THROUGH (Oak Ridge [Clinton] and Hanford, 1944-1945) Events > Bringing It All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 None of Los Alamos's bomb design work would be of any use if Oak Ridge or Hanford did not come through with enough uranium-235 or plutonium for at least one bomb. Spending on the Manhattan Project reached $100 million per month by mid-1944, yet it was still far from clear that enough of either fissionable substance could be produced before war's end. In the summer of 1944, Oak Ridge's Y-12 Electromagnetic Plant (above) was plagued by operational problems, and the ongoing barrier crisis at the K-25 Gaseous Diffusion Plant threatened to render it useless. At Hanford, the first production reactor had not yet been completed. In addition, officials feared that not enough of the uranium-containing slugs to feed the pile would be available. Even assuming that enough uranium or plutonium could be delivered by Oak Ridge or Hanford, there was no guarantee that the Los Alamos laboratory would be able to design and fabricate weapons in time. Only the most optimistic in the Manhattan Project would have predicted, as Groves did when he met with Marshall in August of 1944, that a bomb or bombs powerful enough to make a difference in the current war would be ready by August 1, 1945.

25

Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group  

SciTech Connect

The facilities reported on are all in a fairly mature state of operation, as evidenced by the very detailed studies and correction schemes that all groups are working on. First- and higher-order aberrations are diagnosed and planned to be corrected. Very detailed beam measurements are done to get a global picture of the beam dynamics. More than other facilities the high-luminosity colliders are struggling with experimental background issues, mitigation of which is a permanent challenge. The working group dealt with a very wide rage of practical issues which limit performance of the machines and compared their techniques of operations and their performance. We anticipate this to be a first attempt. In a future workshop in this series, we propose to attempt more fundamental comparisons of each machine, including design parameters. For example, DAPHNE and KEKB employ a finite crossing angle. The minimum value of {beta}*{sub y} attainable at KEKB seems to relate to this scheme. Effectiveness of compensation solenoids and turn-by-turn BPMs etc. should be examined in more detail. In the near future, CESR-C and VEPP-2000 will start their operation. We expect to hear important new experiences from these machines; in particular VEPP-2000 will be the first machine to have adopted round beams. At SLAC and KEK, next generation B Factories are being considered. It will be worthwhile to discuss the design issues of these machines based on the experiences of the existing factory machines.

Wienands, U.; /SLAC; Funakoshi, Y.; /KEK, Tsukuba

2012-04-20T23:59:59.000Z

26

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

SciTech Connect

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

27

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

28

A dynamic model for air-based photovoltaic thermal systems working under real operating conditions  

Science Journals Connector (OSTI)

Abstract In this paper a dynamic model suitable for simulating real operating conditions of air-based photovoltaic thermal (PVT) systems is presented. The performance of the model is validated by using the operational data collected from the building integrated photovoltaic (PVT) systems installed in two unique buildings. The modelled air outlet temperature and electrical power match very well with the experimental data. In Solar Decathlon house PVT, the average (RMS) error in air outlet temperatures was 4.2%. The average (RMS) error in electrical power was also 4.2%. In the Sustainable Buildings Research Centre PVT, the average errors (RMS) of PV and air temperatures were 3.8% and 2.2%, respectively. The performance of the PVT system under changing working condition is also analysed in this paper. The analysis includes the effect of ambient air temperature, air inlet temperature, air flow rate and solar irradiation on thermal, electrical, first law and second law efficiencies. Both the thermal and the 1st law efficiencies almost linearly increased with the increase of the ambient temperature. However, the PVT electrical efficiency and the second law efficiency decreased with the increase of the ambient temperature. All efficiencies expect the second law efficiency decreased with increase of the PVT air inlet temperature. The second law efficiency first increased and then reduced. With increasing the air flow rate all the efficiencies increased. The electrical and second law efficiencies become less sensitive when the air flow rate exceeded 300 l/s. Both the thermal and the 1st law efficiencies decreased while the electrical efficiency and the second law efficiency increased with the increase of the solar irradiation. The efficiencies found to be very sensitive for low level of solar irradiations. At about 400 W m?2 irradiation efficiencies became less sensitive.

M. Imroz Sohel; Zhenjun Ma; Paul Cooper; Jamie Adams; Robert Scott

2014-01-01T23:59:59.000Z

29

Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

Not Available

1992-09-01T23:59:59.000Z

30

Work Domain Analysis of a Predecessor Sodium-cooled Reactor as Baseline for AdvSMR Operational Concepts  

SciTech Connect

This report presents the results of the Work Domain Analysis for the Experimental Breeder Reactor (EBR-II). This is part of the phase of the research designed to incorporate Cognitive Work Analysis in the development of a framework for the formalization of an Operational Concept (OpsCon) for Advanced Small Modular Reactors (AdvSMRs). For a new AdvSMR design, information obtained through Cognitive Work Analysis, combined with human performance criteria, can and should be used in during the operational phase of a plant to assess the crew performance aspects associated with identified AdvSMR operational concepts. The main objective of this phase was to develop an analytical and descriptive framework that will help systems and human factors engineers to understand the design and operational requirements of the emerging generation of small, advanced, multi-modular reactors. Using EBR-II as a predecessor to emerging sodium-cooled reactor designs required the application of a method suitable to the structured and systematic analysis of the plant to assist in identifying key features of the work associated with it and to clarify the operational and other constraints. The analysis included the identification and description of operating scenarios that were considered characteristic of this type of nuclear power plant. This is an invaluable aspect of Operational Concept development since it typically reveals aspects of future plant configurations that will have an impact on operations. These include, for example, the effect of core design, different coolants, reactor-to-power conversion unit ratios, modular plant layout, modular versus central control rooms, plant siting, and many more. Multi-modular plants in particular are expected to have a significant impact on overall OpsCon in general, and human performance in particular. To support unconventional modes of operation, the modern control room of a multi-module plant would typically require advanced HSIs that would provide sophisticated operational information visualization, coupled with adaptive automation schemes and operator support systems to reduce complexity. These all have to be mapped at some point to human performance requirements. The EBR-II results will be used as a baseline that will be extrapolated in the extended Cognitive Work Analysis phase to the analysis of a selected advanced sodium-cooled SMR design as a way to establish non-conventional operational concepts. The Work Domain Analysis results achieved during this phase have not only established an organizing and analytical framework for describing existing sociotechnical systems, but have also indicated that the method is particularly suited to the analysis of prospective and immature designs. The results of the EBR-II Work Domain Analysis have indicated that the methodology is scientifically sound and generalizable to any operating environment.

Ronald Farris; David Gertman; Jacques Hugo

2014-03-01T23:59:59.000Z

31

Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center  

SciTech Connect

This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

Obradovich, Jodi H.

2011-09-30T23:59:59.000Z

32

Facility Operations 1993 fiscal year work plan: WBS 1.3.1  

SciTech Connect

The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO{sub 3}) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP).

Not Available

1992-11-01T23:59:59.000Z

33

U.S. CMS - U.S. CMS @ Work - Data and Computing - Facility Operations -  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Computing Facility Operations Data and Computing Facility Operations In This Section: Getting Started Computing Environment Resources Setup Software Tutorials, Documentation, How Tos Mass Storage File Transfer Batch Systems CRAB Quota and Usage Statistics CERN Bluearc Quota and Stats System Status U.S. CMS Grid Data Transfer to and from UAF At Fermilab, access to User Analysis Farm (UAF) goes through cmsuaf.fnal.gov. This can be accessed using Secure Copy (scp) or sftp. The following storage areas on NFS are available for users: /uscms/home/username /uscms_data/d1/username To transfer a file to UAF: Usage: scp file_name username@cmsuaf.fnal.gov:/uscms/home/username e.g. $ scp zprime705.jdf wenzel@cmsuaf.fnal.gov:/uscms/home/wenzel zprime705.jdf 100% |*****************************| 286 00:00

34

U.S. CMS - U.S. CMS @ Work - Data and Computing - Facility Operations - How  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Computing Facility Operations Data and Computing Facility Operations In This Section: Getting Started Computing Environment Resources Setup Software Tutorials, Documentation, How Tos Mass Storage File Transfer Batch Systems CRAB Quota and Usage Statistics CERN Bluearc Quota and Stats System Status U.S. CMS Grid How to use SRM on the UAF Introduction Prerequisites Prepare your UAF account to use srmcp Transfering a file Monitoring SRM Gettin Help Introduction SRM (Storage Resource Management) is a grid-service available on the UAF. The srmcp command allows for file transfers between sites and mass storage systems. Here we will show examples to transfer files from CASTOR at CERN to Fermilab. Since it is a grid service there are two prerequisites: Prerequisites The whole procedure will probaly take a few days but you might want to

35

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

36

The low temperature differential Stirling engine with working fluid operated on critical condition  

SciTech Connect

The research and development of low temperature differential Stirling engine has a great potential market since a lot of thermal energy at low temperature can supply it and the cost of this kind of engine is lower than general Stirling engine. The characteristics of low compression ratio and low differential temperature Stirling engine may be satisfied with working fluid compressed on critical conditions. By combining two phase heat transfer with forced convective flow in compression space and through the regenerator in the engine, a new heat transfer coefficient emerges capable of absorbing and releasing high heat fluxes without the corresponding low temperature increase. The current analysis focuses on the study of Stirling engines with working fluid compressed on critical conditions, thus at two-phase heat transfer in compression space and regenerator of the engine under forced convective flow conditions.

Naso, V.; Dong, W.; Lucentini, M.; Capata, R.

1998-07-01T23:59:59.000Z

37

Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Checklists and work instructions  

SciTech Connect

This is volume two of the ORNL old hydrofracture facility tanks contents removal action operations plan. This volume contains checklists and work instructions.

NONE

1998-05-01T23:59:59.000Z

38

Operable Unit 7-13/14 in situ thermal desorption treatability study work plan  

SciTech Connect

This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

Shaw, P.; Nickelson, D.; Hyde, R.

1999-05-01T23:59:59.000Z

39

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

40

Audit of Work Force Restructuring at the Oak Ridge Operations Office, ER-B-95-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF INSPECTOR GENERAL AUDIT OF WORK FORCE RESTRUCTURING AT THE OAK RIDGE OPERATIONS OFFICE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov U.S. Department of Energy Human Resources and Administration Home Page

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Report on Inspection of an Intelligence Work-For-Others Project at the Idaho Operations Office, IG-0367  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT ON INSPECTION OF AN INTELLIGENCE WORK-FOR-OTHERS PROJECT AT THE IDAHO OPERATIONS OFFICE The Office of Inspections wants to make the distribution of its inspection reports as customer friendly and cost effective as possible. Therefore, we are making this report available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vml.hqadmin.doe.gov We are experimenting with various options to facilitate audit report distribution. Your comments would be appreciated and can be provided on the Customer Comment Form attached to the

42

Manhattan Project: Establishing Los Alamos, 1942-1943  

Office of Scientific and Technical Information (OSTI)

Entrance to the Los Alamos "Tech Area" ESTABLISHING LOS ALAMOS Entrance to the Los Alamos "Tech Area" ESTABLISHING LOS ALAMOS (Los Alamos: Laboratory, 1942-1943) Events > Bringing it All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 Map of Los Alamos, New Mexico. The final link in the Manhattan Project's far-flung network was the bomb research and development laboratory at Los Alamos, located in the mountains of northern New Mexico. Codenamed "Project Y," the laboratory that designed and fabricated the first atomic bombs began to take shape in spring 1942 when James Conant suggested to Vannevar Bush that the Office of Scientific and Research Development and the Army form a committee to study bomb development. Bush agreed and forwarded the recommendation to Vice President Henry Wallace, Secretary of War Henry Stimson, and General George Marshall (the Top Policy Group). By the time of his appointment in late September, Leslie Groves had orders to set up a committee to study military applications of the bomb. Meanwhile, sentiment was growing among the Manhattan Project scientists that research on the bomb project needed to be better coordinated. Robert Oppenheimer, among others, advocated a central facility where theoretical and experimental work could be conducted according to standard scientific protocols. This would insure accuracy and speed progress. Oppenheimer suggested that the bomb design laboratory operate secretly in an isolated area but allow free exchange of ideas among the scientists on the staff. Groves accepted Oppenheimer's suggestion and began seeking an appropriate location. By the end of the year, they had settled on an unlikely site for the laboratory: an isolated boys' school on a mesa high in the Jemez Mountains (map at left).

43

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

44

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

45

Manhattan Project: Seaborg and Plutonium Chemistry, Met Lab, 1942-1944  

Office of Scientific and Technical Information (OSTI)

Glenn T. Seaborg looks through a microscope at the world's first sample of pure plutonium, Met Lab, August 20, 1942. SEABORG AND PLUTONIUM CHEMISTRY Glenn T. Seaborg looks through a microscope at the world's first sample of pure plutonium, Met Lab, August 20, 1942. SEABORG AND PLUTONIUM CHEMISTRY (Met Lab, 1942-1944) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 While the Met Lab labored to make headway on pile (reactor) design, Glenn T. Seaborg (right) and his coworkers were trying to learn enough about transuranium chemistry to ensure that plutonium could be chemically separated from the uranium that would be irradiated in a production pile. Using lanthanum fluoride as a carrier, Seaborg isolated a weighable sample of plutonium in August 1942. At the same time, Isadore Perlman and William J. Knox explored the peroxide method of separation; John E. Willard studied various materials to determine which best adsorbed (gathered on its surface) plutonium; Theodore T. Magel and Daniel K. Koshland, Jr., researched solvent-extraction processes; and Harrison S. Brown and Orville F. Hill performed experiments into volatility reactions. Basic research on plutonium's chemistry continued as did work on radiation and fission products.

46

Manhattan Project: The Plutonium Path to the Bomb, 1942-1944  

Office of Scientific and Technical Information (OSTI)

Painting of CP-1 going critical THE PLUTONIUM PATH TO THE BOMB Painting of CP-1 going critical THE PLUTONIUM PATH TO THE BOMB (1942-1944) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 Plutonium, produced in a uranium-fueled reactor (pile), was the second path taken toward achieving an atomic bomb. Design work on a full-scale plutonium production reactor began at the Met Lab in June 1942. Scientists at the Met Lab had the technical expertise to design a production pile, but construction and management on an industrial scale required an outside contractor. General Groves convinced the DuPont Corporation to become the primary contractor for plutonium production. With input from the Met Lab and DuPont, Groves selected a site at Hanford, Washington, on the Columbia River, to build the full-scale production reactors.

47

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

D. Vandel

2003-09-01T23:59:59.000Z

48

Work attitudes and intention to quit among workers in private child welfare agencies operating under performance-based contracts  

E-Print Network (OSTI)

Not much is currently known about how employment in child welfare agencies operating under performance-based contracts affects worker attitudes related to retention. This study focuses on the relationship of job satisfaction, ...

Levy, Michelle; Poertner, John; Lieberman, Alice

2012-02-01T23:59:59.000Z

49

The role of historical operations information for supporting remedial investigation work at the former Harshaw Chemical Site - 8279.  

SciTech Connect

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSMs). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the US Department of Energy (DOE) in the 1970s provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the US Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field remobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites.

Johnson, R.; Peterson, J.; Picel, K.; Kolhoff, A.; Devaughn, J.; Environmental Science Division; U. S.Army Corps of Engineers, Buffalo District; Science Applications International Corp.

2008-01-01T23:59:59.000Z

50

The Role of Historical Operations Information for Supporting Remedial Investigation Work at the Former Harshaw Chemical Site  

SciTech Connect

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSM(s). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the U.S. Department of Energy (DOE) in the 1970's provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the U.S. Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field re-mobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites. (authors)

Kolhoff, A. [U.S. Army Corps of Engineers - Buffalo District, Buffalo, NY (United States); Johnson, R.; Peterson, J.; Picel, K. [Argonne National Laboratory, Argonne, IL (United States); DeVaughn, J. [Science Applications International Corporation, Twinsburg, OH (United States)

2008-07-01T23:59:59.000Z

51

Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work  

SciTech Connect

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

D. E. Shanklin

2007-07-25T23:59:59.000Z

52

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

53

Backup power working group best practices handbook for maintenance and operation of engine generators, Volume 1. Revision 1  

SciTech Connect

This handbook is divided into the four chapters. Chapter one covers the design, procurement, storage, handling and testing of diesel fuel oil to be used in DOE backup power supplies. Chapter two discusses the selection of automatic transfer switches to be used in DOE backup power supplies. Chapter three is about low voltage open frame air circuit breaker operation, testing, and maintenance for DOE backup power supplies. And chapter four covers installation, design, and maintenance of engine cooling water and jacket water systems.

Gross, R.; Padgett, A.B.; Burrows, K.P.; Fairchild, P.N.; Lam, T.; Janes, J.

1997-06-01T23:59:59.000Z

54

Performance analysis of regenerative organic Rankine cycle (RORC) using the pure working fluid and the zeotropic mixture over the whole operating range of a diesel engine  

Science Journals Connector (OSTI)

Abstract A regenerative organic Rankine cycle (RORC) system is designed to recover the exhaust heat of a diesel engine, and the influence of the intermediate pressure (the pressures at which the steam is extracted from the expander) on performance parameters such as net power output, thermal efficiency and mass flow rate of the working fluid are analyzed. The organic working fluids under investigation are \\{R245fa\\} and the zeotropic mixture isopentane/R245fa (in a 0.7/0.3 mol fraction). Based on initial calculations of RORC system performance, the intermediate pressure is set to 1.15 MPa for the RORC system when using isopentane/R245fa (in a 0.7/0.3 mol fraction) as the working fluid, and 1.2 MPa when using \\{R245fa\\} as the working fluid. A performance analysis of the RORC system using the two different working fluids is then conducted over the whole operating range of a diesel engine. The results show that the zeotropic mixture isopentane/R245fa (in a 0.7/0.3 mol fraction) performs better. Finally, a combined diesel engine and RORC system is defined to evaluate the performance improvement of such a combined system over the whole operating range. Results show that, for the combined system, a 10.54% improvement in power output and a 9.55% improvement in fuel economy can be achieved at the engine’s rated condition.

Jian Zhang; Hongguang Zhang; Kai Yang; Fubin Yang; Zhen Wang; Guangyao Zhao; Hao Liu; Enhua Wang; Baofeng Yao

2014-01-01T23:59:59.000Z

55

Statement of Work for Direct Push Technology Characterization Borehole Installations During Fiscal Year 2006, 300-FF-5 Operable Unit  

SciTech Connect

This document specifies activities to be performed by FHI to fulfill Part II of the 300-FF-5 Operable Unit Limited Field Investigation. The scope includes driving up to 15 direct push technology boreholes to the water table for radiological geophysical logging of the vadose zone to define the vertical extent and concentration of process uranium waste in the subsurface. Drilling and sampling field activates will follow FHI waste management, risk assessment and QA process and procedures. The sampling and analysis of information recovered during this characterization will meet the Hanford Performance Assessment Project QAAP requirements.

Williams, Bruce A.

2005-11-29T23:59:59.000Z

56

Work with Apple's Rhapsody Operating System which Allows Simultaneous UNIX Program Development, UNIX Program Execution, and PC Application Execution  

E-Print Network (OSTI)

Over the past decade, UNIX workstations have provided a very powerful program development environment. However, workstations are more expensive than PCs and Macintoshes and require a system manager for day-to-day tasks such as disk backup, adding users, and setting up print queues. Native commercial software for system maintenance and "PC applications" has been lacking under UNIX. Apple's new Rhapsody operating system puts the current MacOS on a NeXT UNIX foundation and adds an enhanced NeXTSTEP object oriented development environment called Yellow Box. Rhapsody simultaneously runs UNIX and commercial Macintosh applications such as word processing or spreadsheets. Thus a UNIX detector Monte Carlo can run for days in the background at the same time as a commercial word processing program. And commercial programs such as Dantz Retrospect are being made available to make disk backup easy under Rhapsody. Apple has announced that in 1999 they intend to be running Rhapsody, or MacOS X as it will be called in the commercial release, on all their newer computers. MacOS X may be of interest to those who have trouble hiring expert UNIX system managers; and to those who would prefer to have a single computer and operating system on their desktop that serves both the needs of UNIX program development and running commercial applications, simultaneously. We present our experiences running UNIX programs and Macintosh applications under the Rhapsody DR2 Developer Release.

Don Summers; Chris Riley; Lucien Cremaldi; David Sanders

2004-12-06T23:59:59.000Z

57

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

58

DOE Backup Power Working Group Best Practices Handbook for Maintenance and Operation of Engine Generators, Volume II  

SciTech Connect

The lubricating oil system provides a means to introduce a lubricant in the form of a film to reduce friction and wear between surfaces that bear against each other as they move.1 The oil film which is established also cools the parts by carrying generated heat away from hot surfaces, cleans and carries dirt or metal wear particles to the filter media, and helps seal the piston to the cylinder during combustion. Most systems are pressure lubricated and distribute oil under pressure to bearings, gears, and power assemblies. Lubricating oil usually reaches main, connecting rod, and camshaft bearings through drilled passages in the cylinder block and crankshaft or through piping and common manifolds.Many parts rely on oil for cooling, so if the lube oil system fails to perform its function the engine will overheat. Metal to metal surfaces not separated by a thin film of oil rapidly build up frictional heat. As the metals reach their melting point, they tend to weld together in spots or streaks. Lube oil system failures can cause significant damage to an engine in a short period of time. Proper maintenance and operation of the lubricating oil system is essential if your engine is to accomplish its mission.

Gross, R.E.

1998-10-30T23:59:59.000Z

59

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

SciTech Connect

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

60

RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1  

SciTech Connect

The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

NONE

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

NONE

1999-07-15T23:59:59.000Z

62

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

63

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

64

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

65

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

66

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

67

Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200­-SW­-2 Operable Unit at the U.S. Department of Energy’s Hanford Site  

SciTech Connect

A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200­SW­1 and 200­SW­2 Collaborative Workshops?Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

Truex, Michael J.; Johnson, Christian D.; Nimmons, Michael J.

2007-09-25T23:59:59.000Z

68

Work Address:  

NLE Websites -- All DOE Office Websites (Extended Search)

BO SAULSBURY BO SAULSBURY Work Address: Home Address: Oak Ridge National Laboratory 12952 Buckley Road National Transportation Research Center Knoxville, TN 37934 Building NTRC-2, Room 118 (865) 288-0750 Oak Ridge, TN 37831-6479 (865) 574-4694 saulsburyjw@ornl.gov Technical Specialties: Land use planning Environmental and socioeconomic impact assessment National Environmental Policy Act (NEPA) project management Vehicle fuel economy Education: 1986 B. A., History (minors in English and Business), The University of Tennessee 1989 M. S., Planning, The University of Tennessee (Thesis title: Land Use Compatibility Planning for Airfield Environs: Intergovernmental Cooperation to Protect Land Users From the Effects of Aircraft Operations)

69

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

70

Comparative study of laminar and turbulent flow model with different operating parameters for radio frequency-inductively coupled plasma torch working at 3??MHz frequency at atmospheric pressure  

Science Journals Connector (OSTI)

This paper provides 2D comparative study of results obtained using laminar and turbulent flow model for RF (radio frequency) Inductively Coupled Plasma (ICP) torch. The study was done for the RF-ICP torch operating at 50?kW DC power and 3?MHz frequency located at BARC. The numerical modeling for this RF-ICP torch is done using ANSYS software with the developed User Defined Function. A comparative study is done between laminar and turbulent flow model to investigate how temperature and flow fields change when using different operating conditions such as (a) swirl and no swirl velocity for sheath gas flow rate (b) variation in sheath gas flow rate and (c) variation in plasma gas flow rate. These studies will be useful for different material processing applications.

Sangeeta B. Punjabi; S. N. Sahasrabudhe; N. K. Joshi; H. A. Mangalvedekar; A. K. Das; D. C. Kothari

2014-01-01T23:59:59.000Z

71

Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

Not Available

1994-03-01T23:59:59.000Z

72

Manhattan Project: Bringing it All Together, 1942-1945  

Office of Scientific and Technical Information (OSTI)

Eric Jette, Charles Critchfield, and J. Robert Oppenheimer, Los Alamos BRINGING IT ALL TOGETHER Eric Jette, Charles Critchfield, and J. Robert Oppenheimer, Los Alamos BRINGING IT ALL TOGETHER (1942-1945) Events > Bringing It All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 No matter how much enriched uranium and plutonium might be produced at Oak Ridge and Hanford, it would all come to nothing if workable weapon designs could not be developed in time. To this end, in late 1942 Leslie Groves established a bomb research and development laboratory at Los Alamos in the remote mountains of northern New Mexico. The early work at Los Alamos concentrated primarily on defining the problems that needed to be solved. Basic research on a variety of theoretical issues continued throughout 1943. By 1944, it had become clear that, while a simple and reliable "gun-type" design could be used for a uranium bomb, the considerably more complicated implosion method would be required to produce a plutonium weapon. With the successful Leslie Groves and J. Robert Oppenheimer Allied landings in France on "D-Day," June 6, 1944, the war in Europe appeared to be entering its final phase. Germany ceased to be the primary intended target. General Groves and his advisers turned their sights on Japan, and the rush was on to complete the atomic bomb in time to end the war in the Pacific.

73

Manhattan Project: Implosion Becomes a Necessity, Los Alamos, 1944  

Office of Scientific and Technical Information (OSTI)

Implosion IMPLOSION BECOMES A NECESSITY Implosion IMPLOSION BECOMES A NECESSITY (Los Alamos: Laboratory, 1944) Events > Bringing It All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 An early implosion experiment, Los Alamos, 1944 Because the gun-type bomb design seemed so simple and practical, Deke Parsons had assigned implosion studies a low priority and placed the emphasis on the more familiar artillery method. Consequently, Seth H. Neddermeyer performed his early implosion tests in relative obscurity. Neddermeyer found it difficult to achieve symmetrical implosions at the low velocities he had achieved. When the Princeton mathematician John von Neumann, a Hungarian refugee, visited Los Alamos late in 1943, he suggested that high-speed assembly and high velocities would prevent predetonation and achieve more symmetrical explosions. A relatively small, subcritical mass could be placed under so much pressure by a symmetrical implosion that an efficient detonation would occur. Less fissionable material would be required, bombs could be ready earlier, and extreme purification of plutonium would be unnecessary. Von Neumann's theories excited Robert Oppenheimer, who assigned Parsons's deputy, George B. Kistiakowsky, the task of perfecting implosion techniques. (Kistiakowsky would later become President Dwight D. Eisenhower's science adviser.) Because Parsons and Neddermeyer did not get along, it was Kistiakowsky who worked with the scientists on the implosion project.

74

Work Authorization System  

Directives, Delegations, and Requirements

It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

1999-04-20T23:59:59.000Z

75

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

76

Richland Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

treatment and the data should be available by the end of next week. * Status Conduct of Operations There have been several small incidents recently where observations of work...

77

Help for Working Capital  

Science Journals Connector (OSTI)

Help for Working Capital ... It takes a sharp pencil to figure out ways and means of all eviating the constant pressure for new money for capital expenditure needed by our steadily expanding industry ... These funds not only must now absorb higher operating costs, but also must be counted upon heavily for capital expenditure as well. ...

HARRIS MCASHAN

1950-12-18T23:59:59.000Z

78

Going To Work: Work Relationships  

E-Print Network (OSTI)

One of a worker's top goals should be to develop good relationships with coworkers and supervisers. This publication discusses five general rules for building good relationships at work and offers advice on handling criticism....

Hoffman, Rosemarie

2000-07-20T23:59:59.000Z

79

Operations Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards BPA Operations Information (OPI) Transmission Services operates and plans for regional and national system needs. Transmission Services coordinates system operation and...

80

How Fuel Cells Work | Department of Energy  

Energy Savers (EERE)

Fuel Cells Work How Energy Works 30 likes How Fuel Cells Work Fuel cells produce electrical power without any combustion and operate on fuels like hydrogen, natural gas and...

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Effective Date: 11/05/13 WP 12-IS.01-6 Revision 10 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND ABBREVIATIONS ............................................................................. 8 1.0 INTRODUCTION 1 ............................................................................................... 10 2.0 VISITORS ........................................................................................................... 11

82

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS ............................................................................ 4 1.0 INTRODUCTION .................................................................................................. 6 2.0 NOTIFICATION OR REPORTING REQUIREMENTS AND COMMITMENTS ..... 7

83

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

84

CONDUCT OF OPERATIONS (CO)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONDUCT OF OPERATIONS (CO) CONDUCT OF OPERATIONS (CO) OBJECTIVE TA-55 SST Facility NNSA ORR Implementation Plan 1 1 CO.1 The formality and discipline of operations is adequate to conduct work safely and programs are inplace to maintain this formality and discipline. (Core Requirement 13) Criteria 1. Programmatic elements of conduct of operations are in place for TA-55 SST operations. 2. The TA-55 SST operations personnel adequately demonstrate the principles of conduct ofoperations requirements during the shift performance period. Approach Record Reviews: Review procedures and other facility documents to verify compliance with conduct of operations principles. Interviews: Interview a sampling of the TA-55 SST associated personnel to validate their understanding of the conduct of operations principles (e.g., procedure usage,

85

ARM - Engineering Work Request & Engineering Work Order Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Request & Engineering Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control Process in the ARM Climate Research Facility(PIF/CAR, PRR, ORR, and BCR) Glossary Frequently Asked Questions (PDF, 173K) Engineering Work Request & Engineering Work Order Guidelines Process Guidelines for the Engineering Change Request/Engineering Change Order and Engineering Work Request/Engineering Work Order

86

Statement of Work  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-SOL-0003174 1 FOR OFFICIAL USE ONLY - SOURCE SELECTION SENSITIVE, SEE FAR 3.104-3 PERFORMANCE WORK STATEMENT (PWS) Emergency Operations Training Academy (EOTA) Support Services May 27, 2011 Draft 1.0 Introduction The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Office of Emergency Operations (NA-40) requires support services in the development and delivery of training, exercises, and other related technical and administrative support services at the Emergency Operations Training Academy (EOTA) in Albuquerque, New Mexico. 2.0 Background NA-40's mission is to ensure that capabilities are in place to respond to any NNSA and DOE facility emergency. NA-40 is the nation's premier responder to any nuclear or radiological

87

DOE Corporate Operating Experience Program  

Directives, Delegations, and Requirements

The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Cancels DOE O 210.2.

2011-04-08T23:59:59.000Z

88

Independent Activity Report, Hanford Operations Office - July...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

assessment included evaluation of work control, fall protection, quality assurance, and conduct of operations. Independent Activity Report, Hanford Operations Office - July 2010...

89

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

90

FUPWG Purpose, Policies, and Operations  

Energy.gov (U.S. Department of Energy (DOE))

Draft report—last updated July 22, 2010—discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group (FUPWG).

91

An MPEG audio/video player in software is implemented on a commercial operating system and is detailed evaluated. The primary purpose of this work is to explore new  

E-Print Network (OSTI)

2 Abstract An MPEG audio/video player in software is implemented on a commercial operating system in real­time decoding the audio/video streams. This is a serious drawback to implement decoders results and experiences in implementing an MPEG audio/video decoder in software. The video part

Chen, Sheng-Wei

92

TRU TeamWorks  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2012 8, 2012 WIPP Quick Facts (As of 9-26-12) 10,849 Shipments received since opening (10,252 CH and 597 RH) 83,693 Cubic meters of waste disposed (82,394 CH and 299 RH) 162,472 Containers disposed in the underground (161,882 CH and 590 RH) Photo above right: CBFO Deputy Manager Ed Ziemianski presents a WIPP team with the Green Zia Program Silver Level Award from the New Mexico Environment Department on Aug. 15, 2012 in recognition of environmental initiatives. Shown right of Ziemianski is Farok Sharif, WTS President and General Manager. New WIPP Management and Operating Contractor to start October 1 Nuclear Waste Partnership LLC (NWP) will start work as the WIPP Management and Operating Contractor on Monday, October 1. WIPP receives Green Zia Award The Waste Isolation Pilot Plant (WIPP), the U.S. Department of Energy (DOE)

93

HANFORD ENGINEER WORKS  

Office of Legacy Management (LM)

HANFORD ENGINEER WORKS HANFORD ENGINEER WORKS IJd *P-t - - ~~~ssiticatiC+n cwcetted rat G.E. NUCLEONICS PROJECT xi I ~@L.%&~--G-ENERAI,@ ELECTRIC z ,m ._.__.-. _ I--..-. By Authority of. COMPANY ._ Atmic Energy Commission Office of Hanford Dire&xl Operations Riohland, Washington Attention; Mr. Carleton Shugg, Manager ./ ALPKA-ROLLED EL'GIL%I jw -879 ' . *_ a. f' Richland, Washington February 6, 1948 , Thla Dclc.Jv-

94

Control technology assessment of hazardous waste disposal operations in chemicals manufacturing: walk-through survey report of E. I. Du Pont de Nemours and Company, Chambers Works, Deepwater, New Jersey  

SciTech Connect

A walk through survey was conducted to assess control technology for hazardous wastes disposal operations at du Pont de Nemours and Company (SIC-2800), Deepwater, New Jersey in November 1981. Hazardous wastes generated at the facility were disposed of by incineration, wastewater and thermal treatment, and landfilling. Engineering controls for the incineration process and at the landfill were noted. At the landfill, water from a tank trailer was sprayed periodically to suppress dust generation. Vapor control devices, such as spot scrubbers, were used during transfer of organic wastes from trailers and drums to storage prior to incineration. Wastes were also recirculated to prevent build up of grit in the strainers. The company conducted area monitoring for nitrobenzene (98953) and amines at the landfill and personal monitoring for chloramines at the incinerator. Half mask dust respirators were worn by landfill operators. Operators who unloaded and emptied drums at the incinerator were required to wear face masks, rubber gloves, and boots. The author concludes that disposal of hazardous wastes at the facility is state of the art. An in depth survey is recommended.

Anastas, M.

1984-01-01T23:59:59.000Z

95

DOE - Office of Legacy Management -- Hanford Engineer Works ...  

Office of Legacy Management (LM)

Hanford Engineer Works - WA 01 FUSRAP Considered Sites Site: Hanford Engineer Works (WA.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

96

TRU TeamWorks  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2004 , 2004 By the Numbers WIPP marks five-year anniversary Shipments scheduled to arrive at WIPP for the week of 4/4/04 - 4/10/04: 18 Total shipments received at WIPP: 2,456 Total volume disposed at WIPP: 19,042 m 3 FY04 Performance Metrics D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A weekly e-newsletter for the Waste Isolation Pilot Plant team For those who endured the early morning cold of March 26, 1999, to witness WIPP's first shipment, it may seem like yesterday. Yet Friday marked five years of WIPP operations. Relative newcomer to WIPP - but not to the waste management industry - CBFO Deputy Manager Lloyd Piper observed, "The transformation from a facility in "standby" mode to operational mode has been nothing short of amazing."

97

How Minds Work Working & Episodic Memory  

E-Print Network (OSTI)

1 How Minds Work Working & Episodic Memory Stan Franklin Computer Science Division & Institute for Intelligent Systems The University of Memphis #12;HMW: Working and Episodic Memory 2 Memory Systems #12;HMW: Working and Episodic Memory 3 #12;HMW: Working and Episodic Memory 4 Percept · Result of filtering

Memphis, University of

98

SPEAR Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Interface 1113 N. Kurita J. Langton Vacuum TSP's 1120 J. Corbett A. Terebilo MATLAB Applications - Basics 1121 F. Rafael Booster Kicker Upgrade, Operation Manual 1121...

99

operations center  

National Nuclear Security Administration (NNSA)

1%2A en Operations Center http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismoperationscenter

...

100

February 28, 2006, Department letter reporting completion of NNSA portion of Commitment 23 in the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations, which requires the development of site office action plans to improve the consistency and reliability of work planning and work control at the activity level, including the incorporation of Integrated Safety Management core functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington, DC 20585 Washington, DC 20585 February 28, 2006 OFFICE O F THE ADMINISTRATOR The Honorable A. J. Eggenberger Ch a i rm an Defensc Nuclear Facilities Safety Board 625 Indiana Avenue, NW., Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: On Julie 10, 2005, Secretary Bodnian submitted the Department's Iiizplenzentution Plun to Itizpt-ove Oversight qf'Nucleur Operutions in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004- I , Oversight qf Complex, High-Hrrzurd Nucleur Openrtiotzs. Section 5.3 of the Implementation Plan (IP) addresses Revitalizing Integruted SU/i-'ty Munagernent Implementution, and Subsection 5.3.2 addresses Work Plunning mil Work Control ut the Activity Level. Commitment 23 of the 1P requires development of site office action plans to improve the consistency and reliability of work

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

SAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS  

E-Print Network (OSTI)

The operation of the A-frame and Hydro Boom in the conduct of ship's work and training other personnelSAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS 6.5 A-FRAME AND BOOM OPERATIONS Originator: Approved Boom operations and the qualification for training operators on the R/V Oceanus. 6.5.2 Responsibility

Kurapov, Alexander

102

Tensor Products of Operator Systems Mark Tomforde  

E-Print Network (OSTI)

Tensor Products of Operator Systems Mark Tomforde (Joint work with Ali Kavruk, Vern Paulsen Tomforde (Univeristy of Houston) Tensor Products of Operator Systems October 19, 2009 1 / 37 #12;Operator Spaces and Operator Systems An operator space is a subspace of B(H). Mark Tomforde (Univeristy of Houston

Kerr, David

103

Work Force Restructuring Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

104

Surveillance Guides - Work Control Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Control Process Work Control Process 1.0 Objective The objective of this surveillance guide is to provide lines of inquiry for evaluating the effectiveness of the contractor's work control process. Users should be cognizant that the lines of inquiry need to be further tailored to fit specific facilities or activities in accordance with contractual mechanisms such as Maintenance Implementation Plans, Conduct of Operations Implementation Plans, and the Integrated Safety Management System Description. 2.0 References 2.1 DOE 4330.4B Maintenance Management Program 2.2 48 CFR 1970.5204-2 Department of Energy Acquisition Regulations 2.3 DOE O 5480.19, Conduct of Operations 2.4 10 CFR 830.120, Quality Assurance 3.0 Requirements Implemented This surveillance is conducted to verify implementation of Core

105

Design operators  

E-Print Network (OSTI)

Design operators is a thesis that investigates the nature and characteristics of the design process by examining the interaction of computation with architectural design. The effects of the introduction of these media in ...

Dritsas, Stylianos, 1978-

2004-01-01T23:59:59.000Z

106

Business Operations  

Office of Energy Efficiency and Renewable Energy (EERE)

The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of...

107

Operating Costs  

Directives, Delegations, and Requirements

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

108

Operations Research Analysts  

U.S. Energy Information Administration (EIA) Indexed Site

Operations Research Analysts Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or more of the following important functions: * Develop, design, perform, and document a broad range of analyses and studies involving current and projected energy pricing, production, supply, and distribution, and consumption * Using computer programming skills and knowledge of energy industries and markets, designs and develops math-

109

Chapter 9 -Forklift Operations Forklift Operations Safety Rules  

E-Print Network (OSTI)

, or hazardous locations. 19. Operators should not put their fingers, arms, or legs between the uprights that horn, lights, brakes, tires, gas supply, hydraulic lines, etc. are in safe working condition. Employees

110

How Does a Wind Turbine Work? | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Work? How Does a Wind Turbine Work? How does a wind turbine work? Previous Next Wind turbines operate on a simple principle. The energy in the wind turns two or three...

111

Work Force Retention Work Group Charter  

Energy.gov (U.S. Department of Energy (DOE))

The Work force Retention Work Group is established to support the Department’s critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE’s national security mission are reaching retirement age.

112

Operations | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

113

Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

114

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

115

DOE Corporate Operating Experience Program  

Directives, Delegations, and Requirements

The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

2006-06-12T23:59:59.000Z

116

Substation Operation  

Science Journals Connector (OSTI)

... THIS book is intended to help the workman to understand the principles of substation operation. It is a good attempt at giving somewhat advanced technical knowledge in such ... ." We are told not to use water to put out a fire at a substation before the station has been made completely " dead." The reason given for this ...

1925-08-01T23:59:59.000Z

117

Mobile machine hazardous working zone warning system  

DOE Patents (OSTI)

A warning system is provided for a mobile working machine to alert an individual of a potentially dangerous condition in the event the individual strays into a hazardous working zone of the machine. The warning system includes a transmitter mounted on the machine and operable to generate a uniform magnetic field projecting beyond an outer periphery of the machine in defining a hazardous working zone around the machine during operation. A receiver, carried by the individual and activated by the magnetic field, provides an alarm signal to alert the individual when he enters the hazardous working zone of the machine. 3 figs.

Schiffbauer, W.H.; Ganoe, C.W.

1999-08-17T23:59:59.000Z

118

Mobile machine hazardous working zone warning system  

DOE Patents (OSTI)

A warning system is provided for a mobile working machine to alert an individual of a potentially dangerous condition in the event the individual strays into a hazardous working zone of the machine. The warning system includes a transmitter mounted on the machine and operable to generate a uniform magnetic field projecting beyond an outer periphery of the machine in defining a hazardous working zone around the machine during operation thereof. A receiver, carried by the individual and activated by the magnetic field, provides an alarm signal to alert the individual when he enters the hazardous working zone of the machine.

Schiffbauer, William H. (Connellsville, PA); Ganoe, Carl W. (Pittsburgh, PA)

1999-01-01T23:59:59.000Z

119

Training Work Group Charter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Charter Charter Training Work Group Charter The Training Work Group fosters improvements in the quality, efficacy, and delivery of DOE safety training, and realizes significant efficiencies by minimizing redundancies across the DOE Complex. The Work Group provides a collaborative opportunity for DOE to gain insights from operating contractors, the contractor work force and their representatives, and to combine the best wisdom to assure that the most efficient and effective worker health and safety program expectations, approaches and processes are in place and are well communicated. Training Work Group Charter More Documents & Publications HSS Briefing to the Defense Nuclear Facilities Safety Board (DNFSB) on Union Activities 10 CFR 851 Implementation Work Group Charter

120

Tomboy tackles tough Recovery Act work  

NLE Websites -- All DOE Office Websites (Extended Search)

Seeking job security, the couple applied for work at the Paducah Site. Plant operator USEC Inc. hired Mike while Rebecca took the Recovery Act job. She hopes her training and...

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

operations center | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Our Operations Media Congressional Testimony Fact Sheets Newsletters Press Releases Video Gallery Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home ...

122

Operating Experience Summary, 2014-06  

Office of Environmental Management (EM)

oversight of work; and (6) safety programs such as Integrated Safety Management, Conduct of Operations, and Human Performance, including error precursors and nuclear culture...

123

Operation Poorman  

SciTech Connect

The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

Pruvost, N.; Tsitouras, J.

1981-03-18T23:59:59.000Z

124

Underground Working Natural Gas in Storage - All Operators  

U.S. Energy Information Administration (EIA) Indexed Site

Monthly Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History U.S. 1,857,570 2,270,934 2,642,060 2,936,813 3,210,598 3,564,920 1973-2013 Alaska 14,007 15,277 16,187 17,087 18,569 20,455 2013-2013 Lower 48 States 1,843,563 2,255,657 2,625,874 2,919,726 3,192,029 3,544,465 2011-2013 Alabama 20,405 20,908 20,110 20,532 19,968 21,262 1995-2013 Arkansas 1,486 1,928 2,330 2,735 3,168 3,372 1990-2013 California 255,453 287,757 309,448 326,906 329,024 338,271 1990-2013 Colorado 15,625 19,489 25,833 32,642 40,240 46,136 1990-2013 Illinois 50,160 75,951 110,815 142,938 177,700 218,245 1990-2013

125

Underground Working Natural Gas in Storage - All Operators  

Gasoline and Diesel Fuel Update (EIA)

Monthly Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History U.S. 1,857,570 2,270,934 2,642,060 2,936,813 3,210,598 3,564,920 1973-2013 Alaska 14,007 15,277 16,187 17,087 18,569 20,455 2013-2013 Lower 48 States 1,843,563 2,255,657 2,625,874 2,919,726 3,192,029 3,544,465 2011-2013 Alabama 20,405 20,908 20,110 20,532 19,968 21,262 1995-2013 Arkansas 1,486 1,928 2,330 2,735 3,168 3,372 1990-2013 California 255,453 287,757 309,448 326,906 329,024 338,271 1990-2013 Colorado 15,625 19,489 25,833 32,642 40,240 46,136 1990-2013 Illinois 50,160 75,951 110,815 142,938 177,700 218,245 1990-2013

126

OSCARS Collaborative Work  

NLE Websites -- All DOE Office Websites (Extended Search)

OSCARS Collaborative Work Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers...

127

How It Works  

NLE Websites -- All DOE Office Websites (Extended Search)

How It Works Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Read...

128

CRAD, Work Controls Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Controls Assessment Plan Work Controls Assessment Plan CRAD, Work Controls Assessment Plan Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing deficiency and condition; prescribing appropriate approvals; and including

129

Manhattan Project: CP-1 Goes Critical, Met Lab, December 2, 1942  

Office of Scientific and Technical Information (OSTI)

Painting of CP-1 going critical CP-1 GOES CRITICAL Painting of CP-1 going critical CP-1 GOES CRITICAL (Met Lab, December 2, 1942) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 While arrangements were proceeding for the construction of full-size plutonium production reactors, critical questions remained about their basic design. The Italian physicist Enrico Fermi hoped to answer some of these questions with CP-1, his experimental "Chicago Pile #1" at the University of Chicago. On December 2, 1942, after a series of frustrating delays, CP-1 first achieved a self-sustaining fission chain reaction. After the end of the war, Leslie Groves, commander of the Manhattan Project, described the first time CP-1 went critical as the single most important scientific event in the development of atomic power.

130

10 years of operation of the Upper Tuloma hydroelectric plant  

Science Journals Connector (OSTI)

1. The high quality of the construction work and the fact that the structures were placed in operation under exc...

K. P. Bogoyavlenskii; G. I. Zhelvakov; A. S. Zabara

1975-03-01T23:59:59.000Z

131

Identifying internal best practices and propagating standard work  

E-Print Network (OSTI)

Standard work is commonly used in manufacturing and assembly operations to minimize process variation by providing detailed instruction to operators. Internal best practices are processes within the firm that achieve a ...

Gracewski, Travis E

2010-01-01T23:59:59.000Z

132

Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text  

SciTech Connect

The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Not Available

1993-09-01T23:59:59.000Z

133

FUPWG Purpose, Policies, and Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

134

FUPWG Purpose, Policies, and Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

135

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

9/04 9/04 Shipments expected this week: NTS (2), RFETS (13), SRS (6) January 29, 2004 The Big Story WTS restructures workforce Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/29/04 at 7:14 a.m.) Shipments scheduled to arrive at WIPP this week 21 Total shipments received at WIPP 2,309 Earlier this week WTS, the management and operating contractor at WIPP, announced a workforce restructuring plan to meet the current and future operational needs of the WIPP facility. It is anticipated

136

Operations Authorization Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

137

Infrastructure and Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Operations | National Nuclear Security Administration Operations | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Infrastructure and Operations Home > About Us > Our Operations > Infrastructure and Operations Infrastructure and Operations NNSA's missions require a secure production and laboratory infrastructure meeting immediate and long term needs. The Associate Administrator for

138

Site Visit Report - Independent Oversight Review of Work Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

representatives participate in daily work planning meetings; and instituting Conduct of Operations training for front line managers and Facility Managers. PRS also began...

139

Work with Biological Materials  

NLE Websites -- All DOE Office Websites (Extended Search)

Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

140

Electrical Safe Work Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Safe Work Practices Electrical Safe Work Practices July 15, 2005 NOTE: Working hot is a last alternative All activities on or near electrically energized systems having live parts shall be conducted in accordance with the limitations and procedures specified in the latest version of NFPA 70E and with the safe work practices and conditions that follow. Only qualified personnel {as defined in NFPA 70E Article 110.6(D)} as authorized by supervisor can perform such work. Safe Work Practices: Know the equipment and potential hazards - Define the scope of work. Submit the scope of work to your supervisor for approval. Analyze the hazards use engineered methods to mitigate hazards. Establish procedures as necessary. Use barricades or other means to prevent unqualified persons crossing approach boundaries.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

How a Wind Turbine Works | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Works June 20, 2014 - 9:09am Addthis How does a wind turbine work? Previous Next Wind turbines operate on a simple principle. The energy in the wind turns two or three...

142

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

A weekly e-newsletter for the Waste Isolation Pilot Plant team September 18, 2003 The Big Story Characterization Operations completed at ANL-E Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-18-03 at 7:17 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,020 Total shipments received at WIPP Months of dedication and teamwork have paid off for WIPP Central Characterization Project (CCP) employees working at Argonne National Laboratory - East (ANL-E). Characterization activities at the site have

143

Interagency Sustainability Working Group  

Energy.gov (U.S. Department of Energy (DOE))

The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

144

QEP WORKING GROUP CHARGES Assessment Working Group  

E-Print Network (OSTI)

. (Standard 2.12) During Phase I of the planning process, members of the Assessment Working Group with the institution's strategic plan, a review of the literature, definition of student learning appropriate related to goals. (Handbook for Review Committees, Standards 2.12 and 3.3.2) During Phase I

Liu, Paul

145

Work Permit # 51012MZ5 Work Order# '  

E-Print Network (OSTI)

Confined Space· 0 Ergonomics· 0 Material Handling o ,Beryllium· 0 Electrical 0 Hydraulic o Safety Harness o Electrical Working Hot o Electrical Noise 0 Potential to Cause aFalse Alarm o QiCombustible Gas o IHSurvey Dosimeter o LockoutITagout o Spill potential o Self-reading Pencil Dosimeter o Impair Fire Protection

Homes, Christopher C.

146

Working Group 7 Summary  

SciTech Connect

The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

Nagaitsev S.; Berg J.

2012-06-10T23:59:59.000Z

147

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

148

Transportation External Coordination Working Group:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Study of Study of DOE FY03 SNF Shipments Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 Background Benchmarking * The goal of benchmarking is to identify, understand, and adapt outstanding practices from organizations anywhere in the world to help your organization improve its performance * Benchmarking looks outward to find best practice and high performance and then measures actual business operations against those goals Background Best Practices * Best practices are proven solutions that represent superior performance when adapted and implemented in one's own organization. This includes processes and procedures that others are using to transport radioactive materials Background Lessons Learned * Lessons learned are "good work practices" or

149

Working with Interpreters | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Working with Interpreters | National Nuclear Security Administration Working with Interpreters | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Working with Interpreters Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and

150

ORISE: Operations Support and Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

151

WIPP AT WORK | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AT WORK AT WORK WIPP AT WORK February 1, 2010 - 12:00pm Addthis Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up its 11th year of disposal operations. The Carlsbad Field Office (CBFO) manages the DOE's National TRU Program (NTP) Office and WIPP facility operations. TRU waste temporarily stored at DOE generator sites around the country is shipped to WIPP and disposed in rooms mined out of an ancient salt formation 2,150 feet below the surface. WIPP, which began waste disposal operations in 1999, is located 26 miles outside of Carlsbad, New Mexico. Over the last year, CBFO has successfully completed two major remote-handled (RH) TRU waste shipping campaigns and continues efforts to

152

WIPP AT WORK | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP AT WORK WIPP AT WORK WIPP AT WORK February 1, 2010 - 12:00pm Addthis Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up its 11th year of disposal operations. The Carlsbad Field Office (CBFO) manages the DOE's National TRU Program (NTP) Office and WIPP facility operations. TRU waste temporarily stored at DOE generator sites around the country is shipped to WIPP and disposed in rooms mined out of an ancient salt formation 2,150 feet below the surface. WIPP, which began waste disposal operations in 1999, is located 26 miles outside of Carlsbad, New Mexico. Over the last year, CBFO has successfully completed two major remote-handled (RH) TRU waste shipping campaigns and continues efforts to

153

Work/Life Balance  

NLE Websites -- All DOE Office Websites (Extended Search)

Work/Life Balance Work/Life Balance /careers/_assets/images/careers-icon.jpg Work/Life Balance Explore the multiple dimensions of a career at LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. What our employees say: Health & Wellness "The Lab pays 80 percent of my family's medical premiums with Blue Cross Blue Shield of New Mexico." Retirement & Savings "With the Lab matching my 401K contributions of six percent, I'm making good progress in saving for my retirement." Time Off "Like many of my colleagues here, I work nine hours on most work days so that I can take every other Friday off." Tax Savings "My flexible spending accounts allow me to set aside pre-tax dollars for

154

Photoelectrochemical Working Group  

Energy.gov (U.S. Department of Energy (DOE))

The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water...

155

Hydrogen Pipeline Working Group  

Energy.gov (U.S. Department of Energy (DOE))

The Hydrogen Pipeline Working Group of research and industry experts focuses on issues related to the cost, safety, and reliability of hydrogen pipelines. Participants represent organizations...

156

Emergency Operations Training Academy | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Operations Training Academy | National Nuclear Security Operations Training Academy | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Emergency Operations Training Academy Home > About Us > Our Programs > Emergency Response > Training > Emergency Operations Training Academy Emergency Operations Training Academy Rotating image showing pictures of Classroom, Online and Hands on trainings

157

Climate Data Operators (CDO)  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 3/4, GRIB including SZIP compression, EXTRA, SERVICE and IEG are supported as IO-formats. Apart from that cdo can be used to analyse any kind gridded data not related to climate science. CDO has very small memory requirements and can process files larger than the physical memory. How to Use CDO module load cdo cdo [Options] Operators ... Further Information CDO Online Documentation Availability Package Platform Category Version Module Install Date Date Made Default cdo carver libraries/ I/O 1.4.1 cdo/1.4.1 2012-01-13 2012-01-13 cdo carver libraries/ I/O 1.4.6 cdo/1.4.6 2012-05-24 2012-05-25 cdo carver libraries/ I/O 1.6.1 cdo/1.6.1 2013-07-02

158

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

159

Peak Underground Working Natural Gas Storage Capacity  

Gasoline and Diesel Fuel Update (EIA)

Definitions Definitions Definitions Since 2006, EIA has reported two measures of aggregate capacity, one based on demonstrated peak working gas storage, the other on working gas design capacity. Demonstrated Peak Working Gas Capacity: This measure sums the highest storage inventory level of working gas observed in each facility over the 5-year range from May 2005 to April 2010, as reported by the operator on the Form EIA-191M, "Monthly Underground Gas Storage Report." This data-driven estimate reflects actual operator experience. However, the timing for peaks for different fields need not coincide. Also, actual available maximum capacity for any storage facility may exceed its reported maximum storage level over the last 5 years, and is virtually certain to do so in the case of newly commissioned or expanded facilities. Therefore, this measure provides a conservative indicator of capacity that may understate the amount that can actually be stored.

160

Formal Specification of Operating System Operations  

E-Print Network (OSTI)

Formal Specification of Operating System Operations Dan Zhou Department of Computer Science.black@nist.gov This paper describes the development of a formal specification for a secure operating system architecture operations. We also provide a uniform environment for system commands that change the security state

Black, Paul E.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

STATEMENT OF WORK  

National Nuclear Security Administration (NNSA)

PART III - SECTION J APPENDIX B STATEMENT OF WORK Table of Contents 1.0 General.................................................................................................................... 273 2.0 Laboratory Mission and Scope of Work. ................................................................ 274 3.0 Science & Technology. ........................................................................................... 275 3.1 Defense Programs. .................................................................................................. 276 3.1.1 Stewardship of United States Nuclear Weapons. ................................................ 276 3.1.1.1 Stockpile Certification. .......................................................................................

162

Work Authorization System  

Directives, Delegations, and Requirements

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

2005-04-21T23:59:59.000Z

163

Work Authorization System  

Directives, Delegations, and Requirements

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

2005-04-21T23:59:59.000Z

164

HQ Work Control Permit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.10 Barriers and Postings 5/26/95 OSS 19.3 Confined Space Entry 5/23/95

165

HQ Work Control Permit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.3 Confined Space Entry 5/23/95 WA_02_026_UNITED_TECHNOLOGIES_Waiver_of_Domestic_and_Foreign

166

Trails Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Trails Working Group Trails Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some serve as quiet and non-motorized alternatives between the Townsite and LANL or between technical areas. The Trails Working Group, established in December 2003, includes representatives from local citizen hiking groups, Los Alamos County, Forest Service, Park Service, Los Alamos National Laboratory and the NNSA Los

167

Interagency Working Groups (IWGs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

168

ORISE: Working with ORISE  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Institute for Science Education Oak Ridge Institute for Science Education Working with ORISE If you are interested in learning about how your agency can utilize the capabilities of the Oak Ridge Institute for Science and Education (ORISE) through a Work for Others agreement or a procurement contract, or if you are looking for career opportunities, the following information provides an explanation of how to work with ORISE. If you do not see an option that applies to your needs, please contact ORISE General Information. Work for Others For organizations and agencies that are not affiliated with U.S. Department of Energy (DOE), such groups still have the opportunity to partner with the Oak Ridge Institute for Science and Education (ORISE) through the DOE Work For Others (WFO) program. DOE's WFO program allows ORISE to support

169

WRAP process area development control work plan  

SciTech Connect

This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

Leist, K.L., Fluor Daniel Hanford

1997-02-27T23:59:59.000Z

170

(sanitary) landfill operator  

Science Journals Connector (OSTI)

(sanitary) landfill operator, Müllkippenbetreiber m, Mülldeponiebetreiber, Kippenbetreiber, Deponiebetreiber

2014-08-01T23:59:59.000Z

171

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

172

Hermitian Young operators  

SciTech Connect

Starting from conventional Young operators, we construct Hermitian operators which project orthogonally onto irreducible representations of the (special) unitary group.

Keppeler, Stefan, E-mail: stefan.keppeler@uni-tuebingen.de [Mathematisches Institut, Universität Tübingen, Auf der Morgenstelle 10, 72076 Tübingen (Germany)] [Mathematisches Institut, Universität Tübingen, Auf der Morgenstelle 10, 72076 Tübingen (Germany); Sjödahl, Malin, E-mail: malin.sjodahl@thep.lu.se [Department of Astronomy and Theoretical Physics, Lund University, Sölvegatan 14A, 223 62 Lund (Sweden)] [Department of Astronomy and Theoretical Physics, Lund University, Sölvegatan 14A, 223 62 Lund (Sweden)

2014-02-15T23:59:59.000Z

173

Work Authorization System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

174

NREL: Working for NREL  

NLE Websites -- All DOE Office Websites (Extended Search)

Working for NREL Working for NREL We're always on the lookout for talented people who believe in our mission and support our values. NREL's inclusive work environment benefits from diversity throughout the organization, values individual differences, and encourages employees to develop and contribute to their full potential. Working for NREL is a challenging and exciting experience for nearly 2,300 staff members of all backgrounds. We offer competitive salaries and excellent benefits. NREL Mission While our cultures and creeds, and lifestyles and languages may differ, we share a common desire to carry out our mission- To develop renewable energy and energy efficiency technologies and practices, To advance related science and engineering, and To transfer knowledge and innovations to address the nation's energy

175

How Hybrids Work  

NLE Websites -- All DOE Office Websites (Extended Search)

How Hybrids Work How Hybrids Work Diagram of full hybrid vehicle components, including (1) an internal combustion engine, (2) an electric motor, (3) a generator, (4) a power split device, and (5) a high-capacity battery. Flash Animation: How Hybrids Work (Requires Flash 6.0 or higher) HTML Version: How Hybrids Work Hybrid-electric vehicles (HEVs) combine the benefits of gasoline engines and electric motors and can be configured to obtain different objectives, such as improved fuel economy, increased power, or additional auxiliary power for electronic devices and power tools. Some of the advanced technologies typically used by hybrids include Regenerative Braking. The electric motor applies resistance to the drivetrain causing the wheels to slow down. In return, the energy from the

176

Strategic Initiatives Work Group  

Energy.gov (U.S. Department of Energy (DOE))

The Work Group, comprised of members representing DOE, contractor and worker representatives, provides a forum for information sharing; data collection and analysis; as well as, identifying best practices and initiatives to enhance safety performance and safety culture across the Complex.

177

How NIF Works  

NLE Websites -- All DOE Office Websites (Extended Search)

How NIF Works A weak laser pulse-about 1 billionth of a joule-is created, split, and carried on optical fibers to 48 preamplifiers that increase the pulse's energy by a factor of...

178

Clean Energy Works (Oregon)  

Energy.gov (U.S. Department of Energy (DOE))

Clean Energy Works began in 2009 as a pilot program run by the City of Portland. In 2010, the US department of Energy awarded $20 million to create a statewide nonprofit to expand the program...

179

Fermilab: Science at Work  

ScienceCinema (OSTI)

Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

2013-02-14T23:59:59.000Z

180

Project Work Anna-Maria Liebho  

E-Print Network (OSTI)

Project Work Anna-Maria Liebho Reusable QVT patterns for state machine model transformations Hamburg #12;Project initiated by Airbus Operations GmbH Department ECYE22 - A350 / A380 Software transformation patterns are introduced. They contain typical procedures for converting models from one design

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Working at NNSA | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

at NNSA | National Nuclear Security Administration at NNSA | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Working at NNSA Home > Federal Employment > Working at NNSA Working at NNSA The work at NNSA will challenge you. You may take on significant responsibility quickly, and you will always be engaged in some of the most

182

Working at NNSA | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

at NNSA | National Nuclear Security Administration at NNSA | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Working at NNSA Home > Federal Employment > Working at NNSA Working at NNSA The work at NNSA will challenge you. You may take on significant responsibility quickly, and you will always be engaged in some of the most

183

Onsite Wastewater Treatment Systems: Operation and Maintenance  

E-Print Network (OSTI)

To prevent health hazards to people and pollution in the environment, septic tank systems must be operated and maintained properly. This publication explains how septic systems work and how to keep them running properly....

Lesikar, Bruce J.

2008-10-23T23:59:59.000Z

184

Hydrate Control for Gas Storage Operations  

SciTech Connect

The overall objective of this project was to identify low cost hydrate control options to help mitigate and solve hydrate problems that occur in moderate and high pressure natural gas storage field operations. The study includes data on a number of flow configurations, fluids and control options that are common in natural gas storage field flow lines. The final phase of this work brings together data and experience from the hydrate flow test facility and multiple field and operator sources. It includes a compilation of basic information on operating conditions as well as candidate field separation options. Lastly the work is integrated with the work with the initial work to provide a comprehensive view of gas storage field hydrate control for field operations and storage field personnel.

Jeffrey Savidge

2008-10-31T23:59:59.000Z

185

WORK PROGRAMME 2010 COOPERATION  

E-Print Network (OSTI)

, for economic investments, for prosperity and freedom. The Security theme contributes to the implementation , and to policy areas such as transport3 , health4 , civil protection5 , energy6 and environment7 . Through this national and international actors to co-operate and coordinate in order to avoid unnecessary duplication

Milano-Bicocca, UniversitĂ 

186

Interagency Sustainability Working Group | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Sustainable Buildings & Campuses » Interagency Program Areas » Sustainable Buildings & Campuses » Interagency Sustainability Working Group Interagency Sustainability Working Group October 4, 2013 - 5:00pm Addthis The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the Federal Government. The ISWG: Serves as a forum for information exchange and promotes agency implementation of goals for high-performance and sustainable buildings Develops policy and reporting guidance that fosters the widespread adoption of sustainable design and operations in the Federal sector Develops technical guidance and tools to support implementation of agency sustainability policies for Federally owned, operated, and leased buildings. The ISWG is also charged with providing assistance for implementing the

187

How Fuel Cells Work  

NLE Websites -- All DOE Office Websites (Extended Search)

How Fuel Cells Work How Fuel Cells Work Diagram: How a PEM fuel cell works. 1. Hydrogen fuel is channeled through field flow plates to the anode on one side of the fuel cell, while oxygen from the air is channeled to the cathode on the other side of the cell. 2. At the anode, a platinum catalyst causes the hydrogen to split into positive hydrogen ions (protons) and negatively charged electrons. 3. The Polymer Electrolyte Membrane (PEM) allows only the positively charged ions to pass through it to the cathode. The negatively charged electrons must travel along an external circuit to the cathode, creating an electrical current. 4. At the cathode, the electrons and positively charged hydrogen ions combine with oxygen to form water, which flows out of the cell.

188

ORISE: Work Smart Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Smart Standards Work Smart Standards ORISE Work Smart Standards Set for Environment, Safety, and Health Revision #1, March 21, 2000 Revision #2, Sept. 29, 2000 Revision #3, June 28, 2001 Revision #4, Nov. 9, 2001 Revision #5, Nov. 30, 2001 Revision #6, Jan. 31, 2002 Revision #7, June 28, 2002 Revision #8, Oct. 17, 2002 Revision #9, Nov. 21, 2002 Revision #10, Feb. 28, 2003 Revision #11, May 23, 2003 Revision #12, May 30, 2003 Revision #13, Oct. 30, 2003 Revision #14, Jan. 21, 2004 Revision #15, May 24, 2004 Revision #16, Aug. 17, 2004 Revision #17, Aug. 27, 2004 Revision #18, Oct. 14, 2004 Revision #19, March 28, 2005 Revision #20, May 31, 2005 Revision #21, Aug. 24, 2005 Revision #22, Feb. 17, 2006 Revision #23, March 22, 2006 Revision #24, May 19, 2006 Revision #25, July 26, 2006 Revision #26, Nov. 28, 2006

189

Working with NIST  

NLE Websites -- All DOE Office Websites (Extended Search)

NIST NIST Terry Lynch Office of Technology Partnerships How to Work with NIST How to Work with NIST „ „ Standards Standards „ „ Collaborative Research & Technology Devolvement Collaborative Research & Technology Devolvement Programs Programs „ „ Invention Licensing Invention Licensing Collaborative Research & Technology Collaborative Research & Technology Development Programs Development Programs „ „ Informal collaboration involving intramural research programs Informal collaboration involving intramural research programs „ „ Guest Research Agreements Guest Research Agreements „ „ Facility Use Agreements Facility Use Agreements „ „ Material Transfer Agreements Material Transfer Agreements „ „ Cooperative Research and Development Agreements (CRADA

190

Provincial Operating Standards (Ontario) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Provincial Operating Standards (Ontario) Provincial Operating Standards (Ontario) Provincial Operating Standards (Ontario) < Back Eligibility Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Utility Program Info Start Date 1/24/2002 State Ontario Program Type Environmental Regulations Fees Safety and Operational Guidelines Siting and Permitting Provider Ontario Ministry of Natural Resources The Provincial Operating Standards set the technical minimum requirements for cover wells and works regulated under the Oil, Gas and Salt Resources Act. These standards are the minimum requirements for the design, installation, operation, abandonment and safety of wells and works, but are not intended for use as a design handbook. In addition, the Standards outline the permitting process for injection

191

Classic work on astronomy  

Science Journals Connector (OSTI)

... A History of Ancient Mathematical Astronomy. Part 1: Pp. xxi + 1?555. Part 2: Pp. 556?1 ... a magnificent work that will surely become a major classic in the historiography of ancient astronomy, a three-volume treatise devoted almost entirely to the mathematical ...

G. J. Whitrow

1976-03-18T23:59:59.000Z

192

Moulinath Banerjee Work Address  

E-Print Network (OSTI)

.Stat.(Honors) 1995, in First Division with Distinction. Employment Associate Professor of Statistics, UniversityMoulinath Banerjee Work Address University of Michigan Department of Statistics 439, West Hall 1085 estimation, Statistical Methods in Astronomy, Biomedical studies and Epidemiology, Threshold and boundary

Banerjee, Moulinath

193

Moulinath Banerjee Work Address  

E-Print Network (OSTI)

.Stat.(Honors) 1995, in First Division with Distinction. Employment Associate Professor of Statistics, University Methods in Non­standard Problems. Currently employed as Tenure-track Assistant Professor of StatisticsMoulinath Banerjee Work Address University of Michigan Department of Statistics 439, West Hall 1085

Banerjee, Moulinath

194

Work Force Discipline  

Directives, Delegations, and Requirements

The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

1983-03-23T23:59:59.000Z

195

Noninterference for a practical DIFC-based operating system  

E-Print Network (OSTI)

The Flume system is an implementation of decentralized information flow control (DIFC) at the operating system level. Prior work has shown Flume can be implemented as a practical extension to the Linux operating system, ...

Tromer, Eran

196

JLF Conduct of Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Jupiter Laser Facility (JLF) Conduct Of Operations The Conduct of Operations is a set of procedures and guidelines that are put in place to ensure operational safety and security...

197

Heat Transfer Operators Associated with Quantum Operations  

E-Print Network (OSTI)

Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

Ç. Aksak; S. Turgut

2011-04-14T23:59:59.000Z

198

DOE-Idaho Operations Summary For May 17 to June 6, 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Cleanup Project May 19: Liquid nitrogen from tank venting flowed under the work boots of an operator at the Integrated Waste Treatment Unit site, freezing the operator's...

199

Working With Berkeley Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with the Lab Working with the Lab A-Z Index Search Phone Book Comments Ernest Orlando Lawrence Berkeley National Laboratory Technology Transfer Patent Department Sponsored Projects Office Procurement: Doing Business with the Lab Visitor Information Scientififc Divisions and National User Facilities UC Campus-Labs Collaboration Programs Berkeley Lab stresses collaboration in everything we do. The Laboratory is involved in many research partnerships with private industry. Our mission also includes the transfer of Laboratory inventions to the private sector for rapid commercialization. The role of the Technology Transfer Office is to make technology and expertise developed here available to industry. Contact the Technology Transfer Office to pinpoint research areas of common interest, negotiate rights to Laboratory intellectual property, and to discuss current patent and copyright licensing opportunities.

200

Working Group Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K. Zorika G. Zhang Focus of Discussion The session convened on March 2, with brief introductions by Bill Clements. The purpose of the session was to discuss the scientific merits of retrofitting TOGA/TAO buoys with shortwave radiometers. Three questions were posed at the outset of the session to focus the discussion.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Putting Dollars to Work  

E-Print Network (OSTI)

the extent to which bacteria are present. If these data demonstrate the need for an assessment of total maximum daily loads, experts in bacterial source tracking will help plan and imple- ment appropriate follow-up. Dairy Compost Utilization... This project addresses the elevated concentrations of ammonia, nitrogen, phosphorus and fecal bacteria found in parts of the North Bosque River, Upper North Bosque River and Leon River. Texas A&M agricultural scientists are working with composters...

Wythe, Kathy

2006-01-01T23:59:59.000Z

202

SEWAGE: Algae at Work  

Science Journals Connector (OSTI)

SEWAGE: Algae at Work ... Taking their cue from the successful use of bacteria to rid sewage of biodegradable wastes, engineers at the University of Kansas and Trans Union Corp. have a process that uses algae to remove inorganic nitrogen, phosphorus, and carbon compounds from secondary treatment plant effluent. ... Though it has long been known that algae feed on inorganic wastes, the phenomenon had not been thought to hold much promise for sewage treatment. ...

1969-09-01T23:59:59.000Z

203

BNL | Center for Functional Nanomaterials Hours of Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

CFN Hours of Operation CFN Hours of Operation Normal working hours at the CFN are 8 a.m. to 6 p.m. Working Outside of Normal Hours CFN scientific and technical personnel, as well as external users, may need to work outside of normal operating hours, during which time support is limited and many colleagues may not be around. Therefore, working outside the 8 a.m. to 6 p.m. envelope on weekdays, or anytime on weekends and holidays, requires special precautions, especially if working in a laboratory. CFN users are expected to work at the CFN during normal working hours. Users with extensive experience working at the CFN may be granted permission by the appropriate facility leader and ES&H Coordinator to work after hours. Users first must complete the Request to Work After-Hours at

204

Freedom of Information and Privacy Act Database PIA, Idaho Operations...  

Energy Savers (EERE)

Freedom of Information and Privacy Act Database PIA, Idaho Operations Office More Documents & Publications PIA - Security Clearance Work Tracking and Budget System TRAIN-PIA.pdf...

205

BOGlanl.working.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

Delivering Excellence in Delivering Excellence in National Security Science 2010 Board of Governors Annual Report Los Alamos National Security, LLC Los Alamos National Laboratory is operated by Los Alamos National Security, LLC for DOE's National Nuclear Security Administration LANS BOARD OF GOVERNORS ANNUAL REPORT FY10 Significant Accomplishments ----------- 4 Targeted Investing for the Future ------------ 5 Creating Our Future ----------------- 6 Enabling Our Mission ----------------12 Outreach and Community Commitment ---------13 2010 LANS Board of Governors ------------14 Contents Front cover In FY10, the Laboratory's Dual Axis Radiographic Hydrodynamic Test (DARHT) facility completed four successful two axis, multi-frame hydrodynamic tests. Here, Terry Priestley inspects components on

206

Mission Operations & Data Systems  

E-Print Network (OSTI)

Mission Operations & Data Systems The LASP Mission Operations & Data Systems (MO&DS) group staffs and instruments. Operational software acts like the health systems in a body, ensuring that temperature, energy. The software monitors the health of on-board systems; anything unusual is flagged and sent to mission operators

Mojzsis, Stephen J.

207

Performing an allreduce operation using shared memory  

DOE Patents (OSTI)

Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

Archer, Charles J. (Rochester, MN); Dozsa, Gabor (Ardsley, NY); Ratterman, Joseph D. (Rochester, MN); Smith, Brian E. (Rochester, MN)

2012-04-17T23:59:59.000Z

208

INL's '@work' Scientific Glassblower  

SciTech Connect

INL's '@work' segments feature INL employees and the jobs they perform. This edition features INL's Russell Lewis, a skilled glassblower. Learn more at http://www.facebook.com/idahonationallaboratory. Prepared by Battelle Energy Alliance, LLC under Contract NO.DE-AC07-05ID14517 with the U.S. Department of Energy. The United States Government retains a nonexclusive paid-up, irrevocable, world-wide license to publish or reproduce this video, or allow others to do so, for United States Government Purposes.

Lewis, Russel

2008-01-01T23:59:59.000Z

209

ARM - SGP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements with the highest priority, on which the existing experimental designs are based, are regular routine observations, as specified in the ARM Program Plan, 1990 (U.S. Department of Energy 1990). Scientifically and logistically, routine operations also serve as the basis and background for all nonroutine operations, including

210

ENVIRONMENTAL PROTECTION AGENCY INTERAGENCY WORKING GROUP ON MEDICAL RADIATION  

E-Print Network (OSTI)

of the Interagency Working Group for the practice of diagnostic radiology by Federal agencies. Since the body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Quality Assurance Equipment Operator Performance Patient Exposure Considerations DENTAL RADIOGRAPHY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Prescription of Dental X rays

211

Department-wide Quick Reaction Work Order System  

Directives, Delegations, and Requirements

To describe the new Department Wide Quick Reaction Work Order System, to establish the criteria and procedures for its use, and to identify responsibilities for managing and operating the system.

1981-03-12T23:59:59.000Z

212

Putting Science to Work  

NLE Websites -- All DOE Office Websites (Extended Search)

(continued on page 4) (continued on page 4) ORNL Technology Transfer & Economic Development (TTED) seeks to foster economic development and the growth of business & industry by making available the most innovative equipment, the latest technology, and the expertise of ORNL researchers to technology-based companies throughout the nation. Building Synergy in a 'Deep Green' Community(tm) O ak Ridge National Laboratory researchers have been clamoring for years to prove and demon- strate the benefits of employing energy efficiency in residential buildings. Such high-performing, energy-efficient buildings tend to be more durable, comfortable, and desirable, and they use less energy and cost less to operate. They can help the environment and our nation, improving our energy security as well as the everyday lives of Americans.

213

WORKING PAPER N 2012 -11  

E-Print Network (OSTI)

. It is an extension of a report from the quantitative pillar of the WORKS project than can be accessed to the promotion of sustainable work and to workplace innovation. The relation between quality of work of quality of work with three main objectives: provide a general mapping of quality of work across European

Paris-Sud XI, Université de

214

May 21, 2012, Office of Health, Safety and Security (HSS) Focus Group Work Force Retention Work Group Charter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Charter Work Force Retention Work Group Charter In an ongoing effort to further the improvement of health, safety, environmental, and security performance within the Department, DOE is engaged in the establishment of work groups to pursue health and safety improvements across the DOE Complex. These efforts support DOE's responsibility as owner/manager to protect its greatest asset: the worker. The work groups support DOE's integrated safety management system and further DOE's best interests by fostering worker involvement and partnerships to maximize continuity of operations and the success of the Department's national security mission.

215

Working With FEERC  

NLE Websites -- All DOE Office Websites (Extended Search)

Mechanisms For Partnering Mechanisms For Partnering with the Fuels, Engines, and Emissions Research Center at the Oak Ridge National Laboratory Oak Ridge National Laboratory (ORNL) has a program designed to provide technology-based solutions to organizations ranging from startups to Fortune 100 companies to academic institutions. Underlying this philosophy is our belief that strong partnerships with U.S. industry are the best way to share technological know-how with the private sector. Regardless of the activity-entering into a Cooperative Research and Development Agreement (CRADA) or Work for Others (WFO) agreement, or interacting with an industry or university through other means-we are committed to outcomes that create beneficial opportunities for the external organization as well as

216

End of Month Working  

Gasoline and Diesel Fuel Update (EIA)

The level of gas in storage at the end of the last heating season (March The level of gas in storage at the end of the last heating season (March 31, 2000) was 1,150 billion cubic feet (Bcf), just above the 1995-1999 average of 1,139 Bcf. Underground working gas storage levels are currently about 8-9 percent below year-ago levels. In large part, this is because injection rates since April 1 have been below average. Storage injections picked up recently due to warm weather in the last half of October. The month of November is generally the last month available in the year for injections into storage. A cold November would curtail net injections into storage. If net injections continue at average levels this winter, we project that storage levels will be low all winter, reaching a level of 818 Bcf at the end of March, the lowest level since 1996

217

How NIF Works  

SciTech Connect

The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

2009-07-30T23:59:59.000Z

218

Working Group Report: Sensors  

SciTech Connect

Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

Artuso, M.; et al.,

2013-10-18T23:59:59.000Z

219

How NIF Works  

ScienceCinema (OSTI)

The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

None

2010-09-01T23:59:59.000Z

220

Fuel Cell Technologies Office: Durability Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Durability Working Group Durability Working Group The Durability Working Group meets twice per year to exchange information, create synergies, and collaboratively develop both an understanding of and tools for studying degradation mechanisms of polymer electrolyte fuel cell stacks. Its members include principle investigators and supporting personnel from U.S. Department of Energy (DOE)-funded durability projects. More information on DOE durability activities can be found in the Multi-Year Research, Development, and Demonstration Plan. Description Technical Targets Meetings Contacts Description DOE durability targets for stationary and transportation fuel cells are 40,000 hours and 5,000 hours, respectively, under realistic operating conditions. In the most demanding applications, realistic operating conditions include impurities in the fuel and air, starting and stopping, freezing and thawing, and humidity and load cycles that result in stresses on the chemical and mechanical stability of the fuel cell materials, components, and interfaces. Degradation-exacerbating conditions resulting from cyclic operation include hydrogen starvation, differential pressure imbalance, oxidation-reduction cycling, and oxygen ingress to the anode, resulting in high cathode potentials. Significant progress has been made in determining the degradation mechanisms of fuel cell components and developing improved materials. However, as stated in the 2008 DOE Fuel Cell Solicitation, there is a need for further research and development in the following areas:

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Peak Underground Working Natural Gas Storage Capacity  

Gasoline and Diesel Fuel Update (EIA)

Methodology Methodology Methodology Demonstrated Peak Working Gas Capacity Estimates: Estimates are based on aggregation of the noncoincident peak levels of working gas inventories at individual storage fields as reported monthly over a 60-month period ending in April 2010 on Form EIA-191M, "Monthly Natural Gas Underground Storage Report." The months of measurement for the peak storage volumes by facilities may differ; i.e., the months do not necessarily coincide. As such, the noncoincident peak for any region is at least as big as any monthly volume in the historical record. Data from Form EIA-191M, "Monthly Natural Gas Underground Storage Report," are collected from storage operators on a field-level basis. Operators can report field-level data either on a per reservoir basis or on an aggregated reservoir basis. It is possible that if all operators reported on a per reservoir basis that the demonstrated peak working gas capacity would be larger. Additionally, these data reflect inventory levels as of the last day of the report month, and a facility may have reached a higher inventory on a different day of the report month, which would not be recorded on Form EIA-191M.

222

EXHIBITION OF THE WORKS OF LEONARDO DA VINCI  

Science Journals Connector (OSTI)

...on "Appli-cation of the Unit Operations of Chemical Engineer-ing...attention on the control of unit operations in food processing...reached the age of seventy years, retired from active work on February...Victoria Medal to O. G. S. Crawford, for his archeological maps...

1940-05-24T23:59:59.000Z

223

Why.Spring. working.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

nuclear inspectors nuclear inspectors train by playing video games | pg. 10 April 2011 In this Issue Plans to reduce LANL's environmental impact | pg. 16 LANL is operated by Los Alamos National Security, LLC for the U.S. Department of Energy's National Nuclear Security Administration About this issue Why would a graphic artist choose to work at Los Alamos National Laboratory over DreamWorks or Pixar? Why would a team of scientists and engineers play games to make the world a safer place? We'll introduce you to an unlikely team working (and playing) together to blend the real world with the virtual one. Step into the best of both on page 10. In your own corner of the world, you may notice fewer copies of Why magazine in your workplace-starting with this issue, you will only be mailed a printed paper copy if you

224

Working and Net Available Shell Storage Capacity  

U.S. Energy Information Administration (EIA) Indexed Site

Working and Net Available Shell Storage Capacity Working and Net Available Shell Storage Capacity With Data for September 2013 | Release Date: November 27, 2013 | Next Release Date: May 29, 2013 Previous Issues Year: September 2013 March 2013 September 2012 March 2012 September 2011 March 2011 September 2010 Go Containing storage capacity data for crude oil, petroleum products, and selected biofuels. The report includes tables detailing working and net available shell storage capacity by type of facility, product, and Petroleum Administration for Defense District (PAD District). Net available shell storage capacity is broken down further to show the percent for exclusive use by facility operators and the percent leased to others. Crude oil storage capacity data are also provided for Cushing, Oklahoma, an

225

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

NLE Websites -- All DOE Office Websites (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

226

Will NIF Work  

E-Print Network (OSTI)

It is vital that new clean and abundant sources of energy be developed for the sustainability of modern society. Nuclear fusion of the hydrogen isotopes deuterium and tritium, if successful, might make a major contribution toward satisfying this need. The U.S. has an important effort aimed at achieving practical inertial confinement fusion, ICF, which has been under development for decades at the Lawrence Livermore National Laboratory. The National Ignition Facility (NIF) is a giant laser to multiply-shock and thus quasi-isentropically compress a capsule of deuterium-tritium (DT) to high density and temperature, where the fusion rate is proportional to density squared times temperature to the fourth power. The principal problem that must be solved for NIF to work successfully is elimination of the Rayleigh-Tailor (R-T) instability that originates from the interface between the solid shell and the DT fuel within it. The R-T instability poisons the fusion reaction by reducing the temperature of the DT achieved ...

Nellis, W J

2009-01-01T23:59:59.000Z

227

BNL | ATF Operations Weekly Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Weekly Summary Operations Weekly Summary Week Starts E-beam Status CO2 Status 2013/12/30 Up time: 0 days Down time: 5 days Activity: Maintenance & holiday week Up time: 0 days Down time: 5 days (setup) Activity: OPA work & holiday week 2013/12/23 Up time: 1 days Down time: 4 days (holiday week) Exp: Beam Studies Group: ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days Activity: OPA work & holiday week 2013/12/16 Up time: Down time: Exp: AE-58, ERL BPM testing + beam studies Group: AE58, BNL (C-AD) / ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days (setup) Activity: OPA work, EUVL test setup (AE59) and maintenance 2013/12/09 Up time: Down time: Exp: AE-52, Beam Manipulation by self wakefield Group: AE52, Euclid techlabs Energy: 57.6 MeV

228

Transforming Commercial Building Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

229

Transforming Commercial Building Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

230

Quantum Operations and Measurement  

E-Print Network (OSTI)

the Stinespring dilation form of E . 6 #12; II: operator­sum representation E(#) = Tr env # U(## # env )U

Seevinck, Michiel

231

Challenge # 3 ? Operational Issues  

Energy.gov (U.S. Department of Energy (DOE))

Fernando Preto presentation on May 9, 2012, at the Pyrolysis Oil Workshop on Challenge #3 Operational Issues.

232

Computer Science This sheet has sample occupations, work settings, employers, and career development activities associated with this major. Some of these  

E-Print Network (OSTI)

Computer Science This sheet has sample occupations, work settings, employers, and career Occupations Computer Operations Computer Hardware/ Software Engineer Computer Operator Database Manager/ Administrator Data Entry Operator Operations Manager Design & Manufacturing, Engineering Computer Applications

Ronquist, Fredrik

233

Seismological Work at Georgetown University  

Science Journals Connector (OSTI)

...excep- tion the fundamental requirement that...interior- wall of boiler-room. This...the buildings safe for operation and providing...amperes for normal operation. A Laon tube...0.1, the fundamental REPORTS AND PAPERS...

F. W. Sohon; S.J.

234

Operations and maintenance philosophy  

SciTech Connect

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

235

Operating System Resource Management  

E-Print Network (OSTI)

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

236

Aerial Work Platform Safety Program  

E-Print Network (OSTI)

Aerial Work Platform Safety Program Updated: July 22, 2013 #12;Aerial Work Platform Safety Program ..........................................................................................................11 #12;Aerial Work Platform Safety Program 1 The official version of this information will only for establishing and maintaining the Aerial Work Platform Safety Program. Appropriate safety equipment (e

Holland, Jeffrey

237

Video Shoot Scope of Work  

Energy.gov (U.S. Department of Energy (DOE))

Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

238

High Temperature Membrane Working Group  

Energy.gov (U.S. Department of Energy (DOE))

This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007.

239

Summary of the D&D Engineering Operations  

E-Print Network (OSTI)

mandatory! · Clear responsibility and accountability! ! #12;Conduct of Operations WORK CONTROL CENTER DKeith Rule Summary of the D&D Engineering Operations Princeton Plasma Physics Laboratory #12&D operations ! Maximum single individual external dose of 573 mRem (5.73 mGy) attributed to the sheer

240

Operating Experience Level 1, 2, and 3 Documents  

Energy.gov (U.S. Department of Energy (DOE))

Operating Experience Level 1, 2, and 3 documents communicate required actions, information on safety issues or trends of concern, and lessons learned on operating experience to the DOE Complex to prevent adverse operating incidents and to expand the sharing of good work practices.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Combined technologies enable high-pressure slickline work  

SciTech Connect

Operators conducting wireline operations can combine the attributes of the slickline grease head and conventional stuffing box to enable work in gas wells at wellhead pressures above 15,000 psi. Wireline/slickline work in high-pressure wells requires meeting the dual challenges of well control and freedom of movement (up and down) for the lines. In a notable application of the combined-technology technique, an operator offshore Louisiana attempted to conduct wireline operations in an 18,000-ft gas and condensate well with 15,600 psi wellhead pressure, using a standard slickline stuffing box to contain the pressure. The standard equipment could not perform the needed function, which involved several trips to depths of 5,000 ft and 18,000 ft. Using a combined-technology, flow-tube stuffing box, the operator was able to conduct the wireline operation without incident; the control arrangement resulted in use of only 3 gal of lubricating oil throughout the job. Post-job analysis of the packing showed only the minimal wear normally associated with low-pressure wireline operations. Although slickline work can be performed in low-pressure gas wells without using the flow-tube stuffing box, the device and the oil used with it isolate the stuffing-box packing from the dry gases, reducing friction swell. This isolation speeds up the operation and reduces packing wear.

Davis, G. [Halliburton Energy Services Inc., Dallas, TX (United States); West, T. [Halliburton Energy Services Inc., Houma, LA (United States)

1998-10-01T23:59:59.000Z

242

Manhattan Project: Final Bomb Design, Los Alamos: Laboratory, 1944-1945  

Office of Scientific and Technical Information (OSTI)

The first 0.11 seconds of the nuclear age, Trinity, July 16, 1945. FINAL BOMB DESIGN The first 0.11 seconds of the nuclear age, Trinity, July 16, 1945. FINAL BOMB DESIGN (Los Alamos: Laboratory, 1944-1945) Events > Bringing It All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 American troops approaching the beach, D-Day, June 6, 1944. Late in 1944, Los Alamos began to shift from research to development and bomb production. Increased production at Oak Ridge and Hanford seemed to promise that enough plutonium and enriched uranium would be available for at least one bomb using each. Germany no longer was the intended primary target. The war in Europe (left) appeared to be entering its final phase, and evidence uncovered by the ALSOS mission in November 1944 indicated that the German atomic program had not gone beyond the research phase. Already by summer 1944, Groves and his advisers had turned their sights toward Japan. The atomic bomb would justify the years of effort, including both the vast expenditures and the judgment of everyone responsible, by bringing the war in the Pacific to a fiery end. J. Robert Oppenheimer Ongoing problems continued to complicate the efforts of Robert Oppenheimer (right) to finalize bomb design. Foremost among these were continuing personnel shortages, particularly of physicists, and supply difficulties. The procurement system, designed to protect the secrecy of the Los Alamos project, led to frustrating delays and, when Herb Lehr, SED, holding the Gadget's core, July 1945. combined with persistent late war shortages, proved a constant headache. The lack of contact between the remote laboratory and its supply sources exacerbated the problem, as did the relative lack of experience the academic scientists had with logistical matters. Leslie Groves and James Conant were determined not to let mundane problems compromise the bomb effort, and in fall 1944 they made several changes to prevent this possibility. Conant shipped as many scientists as could be spared from the Met Lab and Oak Ridge to Los Alamos, hired every civilian machinist he could lay his hands on, and arranged for Army enlisted men to supplement the work force (these GIs were known as SEDS ("Special Engineering Detachment"). Hartley Rowe, an experienced industrial engineer, provided help in easing the transition from research to production. Los Alamos also arranged for a rocket research team at the California Institute of Technology to aid in procurement, test fuses, and contribute to component development. These changes kept Los Alamos on track as design work reached its final stages.

243

Practical Approach to Water System Optimal Operation  

Science Journals Connector (OSTI)

Abstract Optimal pump scheduling is a major consideration when dealing with minimizing operational costs of a water distribution system. Pump operation must balance between three factors. Water balance constraints, including consumer demand and water tank volumes. Hydraulic constraints determining water pump operating point. Electrical tariff rate effecting energy cost. Optimization models may assume linear or discrete pump operation, depending on type and accuracy of the model in use. Linear operation assumes the pump may operate during part of the time step while discrete operation requires the pump to be either on or off during the entire time step. Linear optimization models commonly have short solution times, but cannot contain non-linear constraints such as hydraulic headloss. By such, linear model results may be difficult to implement in a real water system as the hydraulic behavior of the system may render the optimal solution impractical. Likewise, if the pump operation partially uses the time step the pump may be forced to come in and out of duty often causing mechanical ware and tare. Discrete operation provides smooth pump operation and may contain non-linear hydraulic constraint to calculate a more realistic working point for the pump. Discrete models have long solution times due the vast amount of pump operating combinations, which must be explored. Heuristic techniques may be used to shorten solution times but these do not assure global minimization of the solution. The goal of the research is to create a minimum cost optimal operation water distribution system model that utilizes the short solution time of a linear model but also includes non-linear hydraulic constraints effecting pump energy consumption and discrete pump operation. The motivation is to use the model for real-time pump scheduling and for water system design.

E. Price; A. Ostfeld

2014-01-01T23:59:59.000Z

244

Work for Others | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Directed Research and Development (LDRD) Management & Operating (M&O) Contracts Technology Transfer Work for Others Contact Information Laboratory Policy U.S. Department of Energy...

245

Microsoft PowerPoint - 3 1 P Portsmouth History of EM Work Part...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE's work at Portsmouth. DOE responsible for environmental monitoring and restoration, depleted uranium, and waste treatment and disposal operations DOE opened Environmental...

246

Radiation Safety Work Control Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Safety Work Control Form Radiation Safety Work Control Form (see instructions on pg-2) Rev July-2012 Area: Form #: Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers mitigate the radiological hazards introduced by the proposed work? Yes No (b) Can the closed state of the beam line injection stoppers be assured during the proposed work (ie., work does NOT involve injection stoppers or associated HPS)? Yes No If the answers to both questions are yes, the work can be performed safely under an SSRL RSWCF. If the answer to either question is no, then the work must be performed under a SPEAR3 RSWCF. Section 1: Description of work to be done, including date and time. (Person Responsible completes section)

247

Who Works for NIF & PS?  

NLE Websites -- All DOE Office Websites (Extended Search)

about Who Works for NIF & PS? The National Ignition Facility is the product of thousands of hours of work by some of the world's most creative and visionary scientists, engineers...

248

Manhattan Project: Final Reactor Design and X-10, 1942-1943  

Office of Scientific and Technical Information (OSTI)

Schematic of the X-10 Graphite Reactor, Oak Ridge FINAL REACTOR DESIGN AND X-10 Schematic of the X-10 Graphite Reactor, Oak Ridge FINAL REACTOR DESIGN AND X-10 (Met Lab and Oak Ridge [Clinton], 1942-1943) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 Before any plutonium could be chemically separated from uranium for a bomb, however, that uranium would first have to be irradiated in a production pile. CP-1 had been a success as a scientific experiment, but the pile was built on such a small scale that recovering any significant amounts of plutonium from it was impractical. In the fall of 1942, scientists of the Met Lab had decided to build a second Fermi pile at Argonne as soon as his experiments on the first were completed and to proceed with the "Mae West" design for a helium-cooled production pile as well. When DuPont engineers assessed the Met Lab's plans in the late fall, they agreed that helium should be given first priority. They placed heavy water second and urged an all-out effort to produce more of this highly effective moderator. Bismuth and water were ranked third and fourth in DuPont's analysis. Priorities began to change when Enrico Fermi's CP-1 calculations demonstrated a higher value for the neutron reproduction factor k (for a theoretical reactor of infinite size) than anyone had anticipated. Met Lab scientists concluded that a water-cooled pile was now feasible. Crawford Greenewalt, head of the DuPont effort, continued, however, to support helium cooling.

249

A length operator for canonical quantum gravity  

E-Print Network (OSTI)

We construct an operator that measures the length of a curve in four-dimensional Lorentzian vacuum quantum gravity. We work in a representation in which a $SU(2)$ connection is diagonal and it is therefore surprising that the operator obtained after regularization is densely defined, does not suffer from factor ordering singularities and does not require any renormalization. We show that the length operator admits self-adjoint extensions and compute part of its spectrum which like its companions, the volume and area operators already constructed in the literature, is purely discrete and roughly is quantized in units of the Planck length. The length operator contains full and direct information about all the components of the metric tensor which faciliates the construction of a new type of weave states which approximate a given classical 3-geometry.

T. Thiemann

1996-06-29T23:59:59.000Z

250

Building Operator Certification  

E-Print Network (OSTI)

programmed settings review ? Verify damper settings ? Check static pressure sensor calibration ? Review occupant complaint records and remedies ? Review established temperature set points HVAC Controls Operational Review ESL-KT-13-12-49 CATEE 2013: Clean... Operator Certification Energy Efficiency through Operator Training BOC Has Two Levels • Level I: Building Systems Maintenance ? Two or more years experience (5 yrs avg) ? Outcome: Basic understanding of electrical, HVAC and lighting systems...

Lilley, D.

2013-01-01T23:59:59.000Z

251

Coping with Hot Work Environments  

E-Print Network (OSTI)

E-340 04/05 Many Texans work under hot, humid conditions. Summer heat is a particular hazard to agricultural pro- ducers who work long hours under the sun. However, other people working in hot yards, gardens, kitchens or industry jobs are also... evaporation. Wiping sweat from the skin with a cloth also prevents cooling from evaporation. In hot, humid conditions, hard work becomes harder. The sweat glands release moisture and essential David W. Smith, Extension Safety Program The Texas A&M...

Smith, David

2005-04-28T23:59:59.000Z

252

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

253

Business Operations Contacts  

Office of Energy Efficiency and Renewable Energy (EERE)

If you have a question for the Office of Business Operations, you can use this contact information to reach the office you're interested in:

254

Semicausal operations are semilocalizable  

E-Print Network (OSTI)

We prove a conjecture by DiVincenzo, which in the terminology of Preskill et al. [quant-ph/0102043] states that ``semicausal operations are semilocalizable''. That is, we show that any operation on the combined system of Alice and Bob, which does not allow Bob to send messages to Alice, can be represented as an operation by Alice, transmitting a quantum particle to Bob, and a local operation by Bob. The proof is based on the uniqueness of the Stinespring representation for a completely positive map. We sketch some of the problems in transferring these concepts to the context of relativistic quantum field theory.

Eggeling, T; Werner, R F

2002-01-01T23:59:59.000Z

255

Fermilab | Tevatron | Tevatron Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Fermilab's Accelerator Complex Fermilab's Accelerator Complex has 10 accelerators. The Tevatron, which shuts down on Sept. 30, is one of those accelerators. The...

256

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

257

Challenge # 3 ? Operational Issues  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Potential for a renewable heating oil substitution Challenge 3 - Operational Issues What are the most significant barriers to overcome in each market segment? Fernando Preto The...

258

Water Resources Working Group Report  

E-Print Network (OSTI)

Water Resources Working Group Report This report provided content for the Wisconsin Initiative in February 2011. #12;Water Resources Working Group Wisconsin Initiative on Climate Change Impacts October 2010 #12;Water Resources Working Group Members ­ WICCI Tim Asplund (Co-Chair) - Wisconsin Department

Sheridan, Jennifer

259

DOE - Office of Legacy Management -- Gleason Works - NY 55  

Office of Legacy Management (LM)

Gleason Works - NY 55 Gleason Works - NY 55 FUSRAP Considered Sites Site: GLEASON WORKS (NY.55 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Rochester , New York NY.55-1 Evaluation Year: 1994 NY.55-2 Site Operations: Metal fabrication operations - Rolled uranium metal. NY.55-1 Site Disposition: Eliminated - Potential for contamination considered remote NY.55-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.55-1 Radiological Survey(s): Health and Safety Monitoring NY.55-1 NY.55-3 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to GLEASON WORKS NY.55-1 - NLO Report; Klein to Quigley; Trip Report to the Gleason Works, Rochester, New York on October 30 Thru November 10, 1961; December

260

REBUILD AMERICA PROGRAM SCOPE OF WORK  

SciTech Connect

This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

Jeffrey Brown; Bruce Exstrum

2004-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Intermodal Subgroup Draft Work Plan2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 2 Work Plan for the DOE TEC Rail Topic Group Intermodal Sub-Group Status: Active Chair: Melissa Bailey (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: July 17, 2007 Purpose: The purpose of the Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for transporting spent fuel (SNF) and high-level radioactive waste (HLW) to a

262

Working at Argonne's Center for Nanoscale Materials  

NLE Websites -- All DOE Office Websites (Extended Search)

Working at CNM Working at CNM For information on visiting Argonne National Laboratory, collaborating with us, or becoming an independent outside user of our facilities, please contact the CNM User Office. Hours of Operation The CNM, which is mandated to offer user access only 40 hours per week, provides users with routine access to facilities and instrumentation, as well as technical assistance when needed, between the hours of 7:00 a.m. and 7:00 p.m., Monday-Friday, except for Laboratory holidays and maintenance shutdowns. These hours are also in place for the availability of staff in the Theory and Modeling and X-Ray Microscopy Groups. The supercomputing facility (Carbon) and the hard X-ray nanoprobe facility at Sector 26 of the APS are available 24 hours, 7 days a week, except for maintenance shutdowns.

263

TeamWorks09-30-04  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2004 30, 2004 By the Numbers Congressional delegates tour WIPP Transportation and disposal statistics are available on pages 3 and 4. D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A biweekly e-newsletter for the Waste Isolation Pilot Plant team roject personnel were honored to host a group of distinguished visitors on a rare weekend tour that included Chairman David Hobson of the U.S. House of Representatives Energy and Water Development Appropriations subcommittee; Ambassador Linton Brooks, Under Secretary for Nuclear Security; Congressman Steve Pearce; Ines Triay, DOE-EM Deputy Chief Operating Officer, Susan Grant, DOE Chief Financial Officer and several state and city officials. CBFO Deputy Manager Lloyd Piper said it was apparent that the

264

.JETEQUIPMENT &TOOLS OPERATOR'S MANUAL  

E-Print Network (OSTI)

.JETEQUIPMENT &TOOLS OPERATOR'S MANUAL JDP-14J/14M/17M/14JF/14 MF/17MF DRILL PRESS Stock No. .JET-6000 FAX[253] 939-8001 #12;OPERATINGINSTRUCTIONS Before operating the unit, please read this manual workpiece. 7. MAINTAIN TOOLS WITH CARE. Keep tools sharp and clean for the best and safest performance

Kleinfeld, David

265

July 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

266

Operability and Emissions from a Medium-Duty Fleet Operating...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operability and Emissions from a Medium-Duty Fleet Operating with GTL Fuel and Catalyzed DPFs Operability and Emissions from a Medium-Duty Fleet Operating with GTL Fuel and...

267

3 - How Electronic Access Control Systems Work  

Science Journals Connector (OSTI)

Publisher Summary This chapter focuses on Electronic Access Control Systems concepts and how they work. These systems comprise electronic elements, physical elements, operational elements, and logical elements to create a complete working system that facilitates rapid and reliable access to authorized users in a facility at minimum long-term cost to the organization. They are digital networks that control access to security portals. A security portal is an entry into or out of a security boundary. Most Electronic Access Control Systems also function as an intrusion alarm system. From this point forward, it assumes that the systems have an alarm system element. Electronic Access Control Systems comprise field equipment, decision modules, a communications network, one or more databases, and one or more human interface terminals. The most obvious elements of an Electronic Access Control System are the Field Elements: Access Control System Portals (for pedestrians or vehicles), alarm sensors, and any controlled devices such as roll-up doors and lights. This chapter is about Electronic Access Control Systems concepts and how they work. It is important to read this chapter very carefully and be certain that you understand everything in it. Go over the Chapter Objectives and the Chapter Summary. Everything else you read in this book is based on the material in this chapter. Electronic Access Control Systems comprise electronic elements, physical elements, operational elements, and logical elements to create a complete working system that facilitates rapid and reliable access to authorized users in a facility at minimum long-term cost to the organization. This book is written in a hierarchical fashion; that is, the concepts are related first and then expanded on in greater detail later in the book. Accordingly, you will see repetition throughout the book, but that repetition is designed to instill learning in a layered fashion. Author Information: Thomas L. Norman, CPP, PSP, CSC, Executive Vice President, Protection Partners International

Thomas Norman

2012-01-01T23:59:59.000Z

268

Project Work | Tobias Berger | July 2006Page 1 Project Work  

E-Print Network (OSTI)

........................................................................................ 6 1.1.3 Working on the Brand Image ................................................................................................... 6 1.1 Brand Communication in International Collaboration at the Vattenfall Group

269

Operating Experience Level 3, Explosives Safety  

Energy.gov (U.S. Department of Energy (DOE))

This Operating Experience Level 3 (OE-3) document provides information about the dangers inherent in material handling and the role hazard analysis, work planning, and walkdowns can play in preventing injuries during heavy equipment moves. More than 200 material handling events reported to the Occurrence Reporting and Processing System (ORPS) from January 1, 2010, through August 31, 2014.

270

DOE - Office of Legacy Management -- Pennsylvania Ordnance Works - PA 32  

Office of Legacy Management (LM)

Ordnance Works - PA 32 Ordnance Works - PA 32 FUSRAP Considered Sites Site: Pennsylvania Ordnance Works (PA.32 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

271

Richland Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

as needed. Work cooperatively with private landowners to develop elk hunting season strategies that will control elk populations and reduce or eliminate damage problems. 2....

272

FACT SHEET: BIOENERGY WORKING GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 , 2010 1 FACT SHEET: BIOENERGY WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched a Bioenergy Working Group, which will advance the deployment of bioenergy technologies by implementing recommendations of the Technology Action Plan on Bioenergy Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Working Group will work in close cooperation with the Global Bioenergy Partnership (GBEP), which is co-chaired by Brazil and Italy. Initial key activities of the Working Group include: 1. Global Bioenergy Atlas: The Working Group will combine and build upon existing databases of sustainably-developed bioenergy potential around the globe and make it available in an open web-

273

Facility Operations Office, Brookhaven National Laboratory, BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Operations Office Facility Operations Office Safely supporting the missions of the laboratory... The Facility Operations Office addresses key issues in work planning, maintenance engineering, service-delivery models, and annual facility-work plans. Facility Operations Center: The Facility Operations Center provides computer programs designed to assist in the planning, management and administrative procedures required for an effective maintenance and asset management process. As an information technology tool for managing the maintenance process, a Computerized Maintenance Management System (CMMS) is a mission-essential part of any organization, and a tool for success. Infrastructure Management: IM's goal is to ensure Brookhaven National Laboratory real property assets are planned for, managed, tracked, and upgraded as required in order to meet BNL's current and future programmatic needs. To accomplish this IM performs site and utilities master planning, manages BNL's new project request and prioritization system (3PBP), maintains utilities maps, manages BNL's space and facilities data base, and provides program management for BNL's GPP, Line Item and Operating Funded Project programs.

274

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

As a premier Department of Energy nuclear facility, WIPP adheres to the DOE Conduct of Operations requirements of DOE 5480.19 and Institute of Nuclear Power Good Practices,...

275

Work For Others (Non-Department of Energy Funded Work)  

Directives, Delegations, and Requirements

Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1A.

2001-09-28T23:59:59.000Z

276

Work For Others (Non-Department of Energy Funded Work)  

Directives, Delegations, and Requirements

Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. WFO has the following objectives. Cancels DOE O 481.1.

2001-01-03T23:59:59.000Z

277

September 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

278

Infrared Thermography (IRT) Working Group  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrared Thermography (IRT) Working Group Sco McWilliams U.S. Photovoltaic Manufacturing Consor;um (PVMC) Infrared Thermography Infrared Thermography (IRT) has been demonstrated...

279

Working with SRNL - Technology Transfer  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNL GO Tech Briefs Contacts Ombudsman Tech Home SRNL Home Working with SRNL Technology Transfer 2014 SRNL Research and Technology Recognition Reception Click to view the 2014...

280

Strategic Initiatives Work Group Charter  

Energy.gov (U.S. Department of Energy (DOE))

Strategic Initiatives Work Group promote excellence and continuous improvement in the implementation of worker health and safety programs across the DOE complex.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

High Temperature Membrane Working Group  

Energy.gov (U.S. Department of Energy (DOE))

The High Temperature Membrane Working Group consists of government, industry, and university researchers interested in developing high temperature membranes for fuel cells.

282

Renewable Electricity Working Group Presentation  

U.S. Energy Information Administration (EIA) Indexed Site

Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development...

283

Interagency Sustainability Working Group | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sustainable Buildings & Campuses Interagency Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group (ISWG) is the...

284

Transuranic Waste Transportation Working Group Agenda | Department...  

Office of Environmental Management (EM)

Transuranic Waste Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda More Documents &...

285

Field Operations Program  

NLE Websites -- All DOE Office Websites (Extended Search)

688 688 May 1999 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort D. V. O'Hara L. A. Slezak DOE/ID-10688 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort 1 D. V. O'Hara 2 L. A. Slezak 2 Published May 1999 Idaho National Engineering and Environmental Laboratory Automotive Systems and Technology Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Idaho Operations Office 1 INEEL/Lockheed Martin Idaho Technologies Co. 2 U.S. Department of Energy iii EXECUTIVE SUMMARY The Field Operations Program is an electric vehicle testing and evaluation program sponsored by U.S. Department of Energy and managed by the Idaho National Engineering and Environmental

286

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

287

Operations Research Analyst  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as an Operations Research Analyst assigned to CEPE, in Washington, DC and is responsible for conducting independent cost and schedule estimates of...

288

Oak Ridge Operations.  

Office of Legacy Management (LM)

4s - 22 Department of Energy Oak Ridge Operations. SI9J>liB P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director...

289

Operating Oak Ridge's "Calutrons"  

NLE Websites -- All DOE Office Websites (Extended Search)

RIDGE'S CALUTRONS: In this oral history, Theodore Rockwell talks about the Y-12 plant at Oak Ridge where the calutrons were operated by young women, many just out of high school....

290

Oak Ridge Operations YTO  

Office of Legacy Management (LM)

ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I - CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a...

291

Protection Program Operations  

Directives, Delegations, and Requirements

This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

2014-10-14T23:59:59.000Z

292

Operations Security Program  

Directives, Delegations, and Requirements

To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

1992-04-30T23:59:59.000Z

293

Operations and Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

294

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

295

CH Packaging Operations Manual  

SciTech Connect

This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

Washington TRU Solutions LLC

2005-06-13T23:59:59.000Z

296

Cogeneration Operational Issues  

E-Print Network (OSTI)

important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation...

Williams, M.

297

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

adverse impacts 40 CFR 1508.27 (b)(l): The selected action establishes a capability to conduct outdoor linac operations at higher power and greater standoff distances. The SOX...

298

Crane Operation Training  

NLE Websites -- All DOE Office Websites (Extended Search)

remove power from the crane and inform the facility management or CAMD safety. Place a lockout tag on the remote control unit. All CAMD crane operations are conducted using the...

299

Plant Operations Executive Director  

E-Print Network (OSTI)

Campus North Campus Recycling Operations Materials Human Resources Payroll Misc Svs Special Projects Planning Spray Shop Glass Shop Upholstery Shop Plant IT Painting Services G. Weincouff Human Resources Business Services Estimating Shutdown Coordination Scheduling L. Rastique Human Resources 67398 M

Awtar, Shorya

300

Corporate Operating Experience Program  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Essays on Retail Operations  

E-Print Network (OSTI)

-fraction and all-or-none inspection. We further perform a case study to identify deficiencies of store operating practices given different risk preferences. Our findings provide practical guidelines for managers to design cost-efficient inspection policy...

Chuang, Hao-Chun

2013-03-12T23:59:59.000Z

302

Transmission and Storage Operations  

Energy Savers (EERE)

to see minimal to none in static or dynamic mode) - Rates are dependent on size, mechanical wear and operating pressures * PM * PdM 5 Methane Release Reduction Can the gas be...

303

Development of Operation System  

Science Journals Connector (OSTI)

We are gradually developing a total hospital information system known as GUNMAS (Gunma University Network for Medical-Hospital- Information Archiving System). an operation system is also being developed as part o...

Seiji Kato M.D.; Yasuharu Kitani M.D.…

1992-01-01T23:59:59.000Z

304

Sandia National Laboratories: Working with Sandia: Procurement: Potential  

NLE Websites -- All DOE Office Websites (Extended Search)

Small Business Small Business Opportunities Potential Suppliers Becoming a Supplier to Sandia Small Business Supplier Summit Small Business Categories Current Suppliers What Does Sandia Buy? Enterprise IT Services Working with Sandia Small Business Categories Small businesses we work with should have the following characteristics: An independently owned and operated entity. Not dominant in the field of operation in which it is bidding on government contracts. Meets criteria concerning number of employees or annual receipts established by the Small Business Administration (SBA). Concerns are "affiliates," when one controls or has the power to control another or when a third party controls or has the power to control both. North American Industry Classification System (NAICS)

305

Pipeline operation and safety  

SciTech Connect

Safety is central to the prosperity of the pipeline industry and the need to maintain high standards of the safety at all times is of paramount importance. Therefore, a primary concern of pipeline operator is adequate supervision and the control of the operation of pipelines. Clearly defined codes of practice, standards and maintenance schedules are necessary if protection is to be afforded to the pipeline system employees, the public at large, and the environment.

Tadors, M.K. [Petroleum Pipelines Co., Cairo (Egypt)

1996-12-31T23:59:59.000Z

306

Quantum Operator Design for Lattice Baryon Spectroscopy  

SciTech Connect

A previously-proposed method of constructing spatially-extended gauge-invariant three-quark operators for use in Monte Carlo lattice QCD calculations is tested, and a methodology for using these operators to extract the energies of a large number of baryon states is developed. This work is part of a long-term project undertaken by the Lattice Hadron Physics Collaboration to carry out a first-principles calculation of the low-lying spectrum of QCD. The operators are assemblages of smeared and gauge-covariantly-displaced quark fields having a definite flavor structure. The importance of using smeared fields is dramatically demonstrated. It is found that quark field smearing greatly reduces the couplings to the unwanted high-lying short-wavelength modes, while gauge field smearing drastically reduces the statistical noise in the extended operators.

Adam Lichtl

2007-09-06T23:59:59.000Z

307

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

308

Cleanroom Work Support Component Areas  

Science Journals Connector (OSTI)

Satisfactory cleanroom operations require adequate support components. The same care in design required for the cleanroom proper must also be used in layout ... and activities that are carried out in the cleanroom

Alvin Lieberman

1992-01-01T23:59:59.000Z

309

Working with SRNL - Technology Partnerships  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE DOE-EM DOE-SR NNSA SRS SRNS Site Map Disclaimer Legal Information SRNL * Aiken * SC * 29808-0001 * SRNL Operator: 803-725-6211 SRNL is the DOE Office of Environmental...

310

Seismological Work in Japan1  

Science Journals Connector (OSTI)

... THE seismological work which has been accomplished in Japan is to a great extent described in fourteen small volumes published by a Society which ... study phenomena connected with earthquakes and volcanoes. This Society is called the Seismological Society of Japan. An epitome of a portion of this work is to be found in nine ...

1889-10-31T23:59:59.000Z

311

B Plant Complex preclosure work plan  

SciTech Connect

This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

ADLER, J.G.

1999-02-02T23:59:59.000Z

312

Solar Industry At Work: Streamlining Home Solar Installation | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Tillie Peterson works at Sunrun a home solar installation company based in San Francisco. As Director of Operations, Tillie works to get solar panels up and running for homeowners as simply and quickly as possible. Our Solar Industry At Work Series shares the personal success of

313

Underground Natural Gas Working Storage Capacity - Energy Information  

Gasoline and Diesel Fuel Update (EIA)

Underground Natural Gas Working Storage Capacity Underground Natural Gas Working Storage Capacity With Data for November 2012 | Release Date: July 24, 2013 | Next Release Date: Spring 2014 Previous Issues Year: 2013 2012 2011 2010 2009 2008 2007 2006 Go Overview Natural gas working storage capacity increased by about 2 percent in the Lower 48 states between November 2011 and November 2012. The U.S. Energy Information Administration (EIA) has two measures of working gas storage capacity, and both increased by similar amounts: Demonstrated maximum volume increased 1.8 percent to 4,265 billion cubic feet (Bcf) Design capacity increased 2.0 percent to 4,575 Bcf Maximum demonstrated working gas volume is an operational measure of the highest level of working gas reported at each storage facility at any time

314

Rankine cycle power plant with improved organic working fluid  

SciTech Connect

In a Rankine cycle power plant having a boiler for vaporizing an organic working fluid which is applied to a turbine in which vaporized working fluid produced by the boiler expands and produces work, a condenser for condensing expanded vaporized working fluid exhausted by the turbine and producing condensate, and means for returning the condensate to the boiler, the improvement is described comprising: (a) operating the boiler so that the organic fluid vaporizes at substantially constant pressure and a temperature not exceeding 400/sup 0/C; (b) applying only vaporized working fluid to the turbine; and (c) using as the working fluid, a compound selected from the group consisting of bicyclic hydrocarbons, substituted bicyclic aromatic hydrocarbons, heterobicyclic aromatic hydrocarbons, substituted heterobicyclic aromatic hydrocarbons, bicyclic compounds where one ring is aromatic and the other condensed ring is nonaromatic, and their mixtures.

Yogev, A.; Mahlab, D.

1988-08-02T23:59:59.000Z

315

Method and Apparatus for Remote Delivery and Manipulation of a Miniature Tool Adjacent a Work Piece in a Restricted Space  

DOE Patents (OSTI)

An apparatus for remote delivery and manipulation of a miniature tool adjacent a work piece in a restricted space, includes a tool camer, a camage for manipulating the tool carrier relative to the work piece, a first actuator for operating the carnage, and an optional remote secondary operating actuator for operating the first actuator.

Sale, Christopher H.; Kaltenbaugh, Daniel R.

2004-08-10T23:59:59.000Z

316

file://\\Bellview\TeamWorks\TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we 8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we December 18, 2003 The Big Story: It's a wrap - 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 12/18/03 at 8:14 a.m.) Shipments scheduled to arrive at WIPP this week 23 Total shipments received at WIPP 2,226 In 2003, the WIPP team delivered in every mission-essential area. TRU TeamWorks wraps up the calendar year with 2003's performance highlights. Steve Warren, Washington TRU Solutions (WTS) general manager, says, "I view

317

Work for Others (Non-Department of Energy Funded Work)  

Directives, Delegations, and Requirements

Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11.

2005-01-24T23:59:59.000Z

318

Work for Others (Non-Department of Energy Funded Work)  

Directives, Delegations, and Requirements

Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11, cancels DOE O 481.1C.

2005-01-24T23:59:59.000Z

319

FY 1987 current fiscal year work plan  

SciTech Connect

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

320

Ventilation System to Improve Savannah River Site's Liquid Waste Operations  

Energy.gov (U.S. Department of Energy (DOE))

AIKEN, S.C. – The EM program and its liquid waste contractor at the Savannah River Site are improving salt waste disposition work and preparing for eventual operations of the Salt Waste Processing Facility (SWPF) currently being constructed.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Mobile workstation for decontamination and decommissioning operations  

SciTech Connect

This project is an interdisciplinary effort to develop effective mobile worksystems for decontamination and decommissioning (D&D) of facilities within the DOE Nuclear Weapons Complex. These mobile worksystems will be configured to operate within the environmental and logistical constraints of such facilities and to perform a number of work tasks. Our program is designed to produce a mobile worksystem with capabilities and features that are matched to the particular needs of D&D work by evolving the design through a series of technological developments, performance tests and evaluations. The project has three phases. In this the first phase, an existing teleoperated worksystem, the Remote Work Vehicle (developed for use in the Three Mile Island Unit 2 Reactor Building basement), was enhanced for telerobotic performance of several D&D operations. Its ability to perform these operations was then assessed through a series of tests in a mockup facility that contained generic structures and equipment similar to those that D&D work machines will encounter in DOE facilities. Building upon the knowledge gained through those tests and evaluations, a next generation mobile worksystem, the RWV II, and a more advanced controller will be designed, integrated and tested in the second phase, which is scheduled for completion in January 1995. The third phase of the project will involve testing of the RWV II in the real DOE facility.

Whittaker, W.L.; Osborn, J.F.; Thompson, B.R. [Carnegie-Mellon Univ., Pittsburgh, PA (United States). Robotics Inst.

1993-10-01T23:59:59.000Z

322

FAQS Qualification Card - Nuclear Operations Specialist | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Operations Specialist Nuclear Operations Specialist FAQS Qualification Card - Nuclear Operations Specialist A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-NuclearOperationsSpecialist.docx Description Nuclear Operations Specialist Qualification Card More Documents & Publications

323

NIF's Operations Support Building awarded LEED certification | National  

National Nuclear Security Administration (NNSA)

NIF's Operations Support Building awarded LEED certification | National NIF's Operations Support Building awarded LEED certification | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NIF's Operations Support Building awarded LEED certification NIF's Operations Support Building awarded LEED certification Posted By Office of Public Affairs

324

Kalina combined cycle performance and operability  

SciTech Connect

Gas turbine combined cycles using Rankine bottoming cycles have gained broad market acceptance. The favorable plant economics derive from their high efficiency, short construction cycles and excellent environmental performance. The responsive operating characteristics of combined cycles is another key advantage for customers. Duty cycles cover the spectrum from daily start stop (DSS) to base load. Performance and economics of combined cycles have progressed with advances in gas turbine technology as well as the introduction of increasingly efficient multi-pressure Rankine bottoming cycles. Further advances in gas turbine technology and Rankine bottoming cycle performance are becoming incrementally more difficult and costly to achieve. The availability of the Kalina cycle presents a clear path toward improved combined-cycle system performance and reduced cost of electricity. This paper presents detailed performance and operating characteristics of a STAG 207FA combined cycle employing the Kalina bottoming cycle. These characteristics are compared to a conventional three-pressure reheat Rankine bottoming cycle. The Kalina cycle is shown to have performance and operability advantages throughout the range of site conditions and operating regimes, such as base load, load following, DSS duty, wet and dry cooling tower applications and unattended operation. These advantages derive from a single-pressure once-through heat recovery system, above atmospheric working fluid pressure throughout the system, above atmospheric working fluid pressure throughout the system, very high thermal efficiency ({approximately}2.0 to 2.5 percentage points better than the best Rankine), and compatibility with sub-freezing ambient conditions.

Smith, R.W.; Ranasinghe, J.; Stats, D.; Dykas, S.

1996-12-31T23:59:59.000Z

325

Operations Information for Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Information for Studies Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP total customer loads for Fiscal Year 2009 (Oct, 2008-Sept, 2009) FY2010 Load Information (pdf) SLIP total customer loads for Fiscal Year 2010 (Oct, 2009-Sept, 2010) FY2011 Load Information (pdf) SLIP total customer loads for Fiscal Year 2011 (Oct, 2010-Sept, 2011) FY2012 Load Information (pdf) SLIP total customer loads for Fiscal Year 2012 (Oct, 2011-Sept, 2012) FY2013 Load Information (pdf) SLIP total customer loads for Fiscal Year 2013 (Oct, 2012-Sept, 2013) CRSP Projected Power Releases From USBR (Excel) The most recent file of projected future power releases from CRSP Dams, median projection

326

Storage Ring Operation Modes  

NLE Websites -- All DOE Office Websites (Extended Search)

Longitudinal bunch profile and Up: APS Storage Ring Parameters Longitudinal bunch profile and Up: APS Storage Ring Parameters Previous: Source Parameter Table Storage Ring Operation Modes Standard Operating Mode, top-up Fill pattern: 102 mA in 24 singlets (single bunches) with a nominal current of 4.25 mA and a spacing of 153 nanoseconds between singlets. Lattice configuration: Low emittance lattice with effective emittance of 3.1 nm-rad and coupling of 1%. Bunch length (rms): 33.5 ps. Refill schedule: Continuous top-up with single injection pulses occurring at a minimum of two minute intervals, or a multiple of two minute intervals. Special Operating Mode - 324 bunches, non top-up Fill pattern: 102 mA in 324 uniformly spaced singlets with a nominal single bunch current of 0.31 mA and a spacing of 11.37 nanoseconds between singlets.

327

RHIC II Science Working Groups  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshops Workshops The series of RHIC II Science Workshops began in November 2004, at which time seven Working Groups were initiated. These groups met in workshops through 2005, with the purpose of providing an organized forum for the community to address and describe quantitatively the most important science issues for the proposed RHIC II luminosity upgrade, and corresponding detector upgrades. Each Working Group was led by three convenors representing theory and experiment, and each has produced a detailed report (except for the "New Directions" group, which provided a sounding board and input to the other groups). The Working Group reports are linked below. The summary "white paper" document, "Future Science at the Relativistic Heavy Ion Collider" (PDF), is based on these reports, and was prepared by a Writing Committee that included at least one convenor from each of the Working Groups.

328

Working with Modules within Python  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with Modules within Perl and Python Working with Modules within Perl and Python Working with Modules within Perl and Python It can often be convenient to work with the modules system from within perl or python scripts. You can do this! Using Modules within Python The EnvironmentModules python package gives access to the module system from within python. The EnvironmentModules python package has a single function: module. Using this function you can provide the same arguments you would to "module" on the command line. The module() function accepts a list of arguments, like ['load','']; or ['unload','']. >>> import EnvironmentModules as EnvMod >>> EnvMod.module(['load','blast+']) It is important to understand that this is most effective for scripts

329

Utility Security & Resiliency: Working Together  

Energy.gov (U.S. Department of Energy (DOE))

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses Edison Electric Institute (EEI), including its key security objectives, key activities, cybersecurity activities, and spare transformer equipment program (STEP).

330

BEDES Strategic Working Group Recommendations  

Energy.gov (U.S. Department of Energy (DOE))

The BEDES Strategic Working Group Recommendations document is a guide to how the BEDES Dictionary can be brought to market and provide the services for which it was designed.

331

DOE Work Breakdown Structure Handbook  

Energy.gov (U.S. Department of Energy (DOE))

This handbook provides suggested guidance and best practices on the development of product-oriented Work Breakdown Structures (WBS) that should be used by all projects within DOE to organize and...

332

DOE Catalysis Working Group Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEMFC Performance and Durability - Jim Waldecker (Ford) 9:45 - 10:00 Degradation of Nanoparticle Pt alloy and De-alloyed Pt Catalysts - Debbie Myers (ANL) Catalysis Working Group...

333

At Work in The World  

E-Print Network (OSTI)

the dis- cord created by dangerous health conditions was theDaum, Work Is Dangerous To Your Health, New York, Pantheon,health conditions of some ancient occupations. In particular, in the antiquity, one of the most dangerous and

Blanc, Paul D. MD; Dolan, Brian PhD

2012-01-01T23:59:59.000Z

334

Report of Working Group IV  

Science Journals Connector (OSTI)

This report summarizes the discussions of the Working Group on Resource Policy and East-West Relationships that were held as part of the NATO Advance Study Institute on “Deposit and Geoenvironmental Models for...

Gabor Gaál; Slavko Šolar

2002-01-01T23:59:59.000Z

335

Interagency Committees and Working Groups  

Energy.gov (U.S. Department of Energy (DOE))

DOE is actively involved with other Federal agencies that have responsibilities for the radiation protection of the public and the environment. This site provides the different committees and working groups that DOE is involved with.

336

Work Plan - U.S.-India Coal Working Group | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group More Documents & Publications Work Group Telecom...

337

Safe Chain Saw Operation.  

E-Print Network (OSTI)

Z TA24S.7 8873 NO.1409 B-1409 SAFE CHAIN SAW OPERATION Gary S. Nelson* A chain saw is a portable power cutting machine. Used properly, it will trim or cut down trees, clear land or cut fireplace wood. Improperly used, a chain saw can... ground level , losing balance, shifting chain saw weight while cutting at or above waist level or ex periencing chain saw kickback. Often, loss of balance causes an operator to reach into the running saw blade as he grabs to steady himself. Other...

Nelson, Gary S.

1982-01-01T23:59:59.000Z

338

Updated July 2009 Operations Organization  

E-Print Network (OSTI)

All-Hands, Brown Bags, and COO Open-Door sessions Ongoing Conduct Operations Employee Climate SurveysOperations Strategic Plan Updated July 2009 #12;Operations Organization Chief Operating Officer deliver exceptional operational services in support of the scientific mission of Berkeley Lab. goals

Eisen, Michael

339

Oceanography Vol.22, No.2194 Operational Use and Impact of  

E-Print Network (OSTI)

-to-be-available satellite OSVW data in the operational weather forecasting and warning environment. This effort had threeOceanography Vol.22, No.2194 Operational Use and Impact of Satellite Remotely Sensed Ocean Surface Environmental Satellite, Data, and Information Service (NESDIS) worked together to imple- ment a near

Long, David G.

340

4 - Recrystallisation and grain growth in hot working of steels  

Science Journals Connector (OSTI)

Abstract: This chapter analyses the hardening–softening mechanisms that operate during hot working of steels. Special attention is focused on such aspects as recrystallisation and strain-induced precipitation, which help to achieve refinement and conditioning of the austenite microstructure before transformation. An approach including both semi-empirical and physical models is described, followed by their application to selected industrial cases.

B. López; J.M. Rodriguez-Ibabe

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Hoyte Phifer Facilities Operations  

E-Print Network (OSTI)

battery operated clocks in offices. #12;#12;·Last year, UNCG produced over 1973 tons of solid waste. · 1. , corner of Highland Ave. and Oakland ­ red brick building #12;#12; "All State agencies, universities, and community colleges that have State-owned vehicle fleets shall develop and implement plans to improve

Saidak, Filip

342

Concept of Operations: Essence  

SciTech Connect

This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

Hutton, William J.

2014-04-01T23:59:59.000Z

343

Conduct of Operations  

Directives, Delegations, and Requirements

This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 2, dated 12-3-14, cancels Admin Chg 1.

2010-06-29T23:59:59.000Z

344

RUNWAY OPERATIONAL QUALITY ASSURANCE  

E-Print Network (OSTI)

RUNWAY OPERATIONAL QUALITY ASSURANCE MELANIE BAKER, DARIC MEGERSA & ALFONSO PANLILIO Sponsors: Dr Vortex Separation Rule, for a homogeneous fleet mix, is determined by the time between arriving aircraft Occupancy (SRO) rule, for a non- homogeneous fleet mix, MTC= 3600/ [ROT] [ROT]= = i (pi *ROTi) ROT (in sec

345

Emergency Operations Training Academy | National Nuclear Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

Emergency Operations Training Academy Emergency Operations Training Academy Emergency Operations Training Academy The Office of Emergency Operations, NA-40-The Emergency Operations...

346

LANL highlights explosives work | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

explosives work | National Nuclear Security Administration explosives work | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > LANL highlights explosives work LANL highlights explosives work Posted By Office of Public Affairs For more than 70 years, Los Alamos National Laboratory has been a frontrunner in explosives research, development and applications. To

347

GTRI commended for work to secure radiological sources | National Nuclear  

National Nuclear Security Administration (NNSA)

GTRI commended for work to secure radiological sources | National Nuclear GTRI commended for work to secure radiological sources | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > GTRI commended for work to secure radiological sources GTRI commended for work to secure radiological sources Posted By Office of Public Affairs Container NNSA's Global Threat Reduction Initiative (GTRI) was recently commended

348

GTRI commended for work to secure radiological sources | National Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

GTRI commended for work to secure radiological sources | National Nuclear GTRI commended for work to secure radiological sources | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > GTRI commended for work to secure radiological sources GTRI commended for work to secure radiological sources Posted By Office of Public Affairs Container NNSA's Global Threat Reduction Initiative (GTRI) was recently commended

349

CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations - Y-12 Enriched Uranium Operations Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January, 2005 assessment of Conduct of Operations program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility More Documents & Publications CRAD, DOE Oversight - Y-12 Enriched Uranium Operations Oxide Conversion

350

PAPIERS DE RECHERCHE WORKING PAPERS  

E-Print Network (OSTI)

with operations in Mexico are funded from foreign investments. Additionally, the manufacturing sector is where is still a traditional/manufacturing management style, for Mexico's technology intensive firms. KEY savings by relocating their labor intensive manufacturing components to facilities in Mexico, where labor

Paris-Sud XI, Université de

351

Why.Nov.work3.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

ș ș Los Alamos National Laboratory Advancing National Security Through Scientifi c Inquiry scientists poke and prod the Red Planet November 2011 In this Issue Seeking solutions to global energy problems | pg. 14 LANL is operated by Los Alamos National Security, LLC for the U.S. Department of Energy's National Nuclear Security Administration About this issue We've reached the one-year mark for Why magazine-one full trip around the Sun. This issue takes us to other parts of the solar system. Our cover story highlights the science- and collaboration-behind preparing a mobile laboratory for a Mars reconnaissance mission. Meanwhile, on another side of the Lab, Los Alamos researchers work on solutions to some of planet Earth's greatest energy concerns-applying cutting-edge

352

Fuel Cell Technologies Office: High Temperature Membrane Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

High Temperature Membrane Working Group High Temperature Membrane Working Group The High Temperature Membrane Working Group consists of government, industry, and university researchers interested in developing high temperature membranes for fuel cells. Description Technical Targets Meetings Contacts Description Polymer electrolyte membrane (PEM) fuel cells typically operate at temperatures no higher than 60°C-80°C due to structural limitations of the membrane. Operating PEM fuel cell stacks at higher temperatures (120°C for transportation and 150°C for stationary applications), however, would yield significant energy benefits. For example, heat rejection is easier at higher temperatures, which would allow use of smaller heat exchangers in fuel cell power systems. In addition, for reformate fuel cell systems, carbon monoxide (CO) tolerance of the stack is less problematic at higher temperatures, which would reduce the size requirements or possibly eliminate the need for some CO clean-up beds in the fuel processor.

353

Differences Between Monthly and Weekly Working Gas In Storage  

Weekly Natural Gas Storage Report (EIA)

December 19, 2013 December 19, 2013 Note: The weekly storage estimates are based on a survey sample that does not include all companies that operate underground storage facilities. The sample was selected from the list of storage operators to achieve a target standard error of the estimate of working gas in storage which was no greater than 5 percent for each region. Based on a comparison of weekly estimates and monthly data from May 2002 through September 2013, estimated total working gas stocks have exhibited an average absolute error of 16 billion cubic feet, or 0.6 percent. Background The Energy Information Administration (EIA) provides weekly estimates of working gas volumes held in underground storage facilities at the national and regional levels. These are estimated from volume data provided by a

354

Differences Between Monthly and Weekly Working Gas In Storage  

Weekly Natural Gas Storage Report (EIA)

November 7, 2013 November 7, 2013 Note: The weekly storage estimates are based on a survey sample that does not include all companies that operate underground storage facilities. The sample was selected from the list of storage operators to achieve a target standard error of the estimate of working gas in storage which was no greater than 5 percent for each region. Based on a comparison of weekly estimates and monthly data from May 2002 through August 2013, estimated total working gas stocks have exhibited an average absolute error of 16 billion cubic feet, or 0.6 percent. Background The Energy Information Administration (EIA) provides weekly estimates of working gas volumes held in underground storage facilities at the national and regional levels. These are estimated from volume data provided by a

355

Cable Measuring Engine Operation Procedures  

E-Print Network (OSTI)

MEASURING ENGINE OPERATION PROCEDURES LBNL-40565 SC-MAG-597MEASURING ENGINE OPERATION PROCEDURES INDEX IN T ROD U C TCALIBRATION PROCEDURE . .

Authors, Various

2011-01-01T23:59:59.000Z

356

Operations and Maintenance Program Structure  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

357

On Generalizing Pawlak Approximation Operators  

E-Print Network (OSTI)

}. One may interpret i, c : 2U - 2U as unary set-theoretic operators [8, 15]. They are dual operator

Yao, Yiyu

358

Working Remotely | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Remotely Working Remotely Remote Access Use VPN to access Argonne resources Wake up your computer if power management policies have been applied Connect to your work computer by using Remote Desktop Communications Log into web-based e-mail Outlook Zimbra Send instant messages with Jabber Use Argonne's voice mail and teleconferencing services Use Adobe Connect for web conferencing E-Mail Client and Mobile Device Configuration Changes for Exchange 2010 Cyber Security Secure your home computers Passwords MyPassword Change your password Choosing a good password Other Tools Upload a file for retrieval by others (login required) Argonne SharePoint Server (login required) Inside Argonne (accessible onsite or through VPN) Focal Point Management Blog (accessible onsite or through VPN)

359

Energy Work | Open Energy Information  

Open Energy Info (EERE)

Work Work Jump to: navigation, search Name Energy Work Place Kelaniya, Sri Lanka Sector Biomass, Renewable Energy, Solar Product Dealing with renewable energy applications, specifically solar and biomass power generation Coordinates 6.95°, 79.916702° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":6.95,"lon":79.916702,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

360

Perma Works | Open Energy Information  

Open Energy Info (EERE)

Perma Works Perma Works Jump to: navigation, search Name Perma Works Place Albuquerque, New Mexico Zip 87123 Sector Geothermal energy Product A company that focuses on producing enhanced geothermal systems through providing electronics and software. Coordinates 35.08418°, -106.648639° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.08418,"lon":-106.648639,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Work Practices for Chemical Fumehoods  

NLE Websites -- All DOE Office Websites (Extended Search)

Practices for Chemical Fumehoods Practices for Chemical Fumehoods (Reviewed May 16, 2011) Always use a chemical fumehood when working with toxic and/or volatile chemicals, not on an open bench. Chemical fumehoods are designed to provide protection for the user from chemical and radiological contaminants. However, they do not absolutely eliminate exposure, even under ideal conditions. Careless work practices can result in considerable exposure to users who may believe they are protected. To optimize the performance of the chemical hood, adhere to the following work practices: 1. Ensure that your chemical hood has a current inspection sticker (dated within the last year). The face velocity should be between 80 and 120 linear feet per minute (lfpm). 2. Verify that the chemical hood is drawing air.

362

Policy Memo: Working Effectively with Contractors | Department...  

Energy Savers (EERE)

Policy Memo: Working Effectively with Contractors Policy Memo: Working Effectively with Contractors Guidance on working effectively with contractors. MAPolicyMemoWorkingwContracto...

363

Development of New Biphasic Metal Organic Working Fluids for Subcritical  

Open Energy Info (EERE)

Biphasic Metal Organic Working Fluids for Subcritical Biphasic Metal Organic Working Fluids for Subcritical Geothermal Systems Geothermal Lab Call Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Development of New Biphasic Metal Organic Working Fluids for Subcritical Geothermal Systems Project Type / Topic 1 Laboratory Call for Submission of Applications for Research, Development and Analysis of Geothermal Technologies Project Type / Topic 2 Working Fluids for Binary Power Plants Project Description In binary-cycle plants the cycle efficiency improves as pumping energy is reduced and from maximizing the enthalpy gain of the working fluid for a given amount of heat extracted from the geothermal source brine. Enthalpy gain of the working fluid in the heat exchanger occurs principally from sensible heat gained while passing through the heat exchanger in the liquid state and from vaporization of the organic working fluid near the exit of the heat exchanger. Additional heat transfer is limited after the vapor phase transition due the low thermal conductivity and heat capacity of the vapor. Also, operating pressures and temperatures are constrained by the bulk phase behavior and thermodynamic properties of the working fluid (boiling point, latent heat of vaporization, density, heat capacity, etc.). The fundamental underlying goal of this project is to overcome the cycle efficiency limitations imposed by the bulk thermodynamic proper-ties of the working fluid by introducing a metal-organic heat carrier (MOHC) into the system.

364

Chapter 1: Operating System Models 1 Operating System Models  

E-Print Network (OSTI)

Chapter 1: Operating System Models 1 2 Operating System Models 2.1 Introduction Over the past several years, a number of trends affecting operating system design are witnessed and foremost among them is a move towards modularity. Operating systems such as Microsofts Windows, IBMs OS/2, C-DACs PARAS

Melbourne, University of

365

Operator Standpoint-Based Remote Operation System Considering the Operational Convenience for a Mobile Robot  

Science Journals Connector (OSTI)

The remotely operated mobile robot is usually controlled in the viewpoint of the mobile robot using the conventional remote operation system. However, it is a little hard ... , we propose the operator standpoint-...

Chang-Seop Shin; Gon-Woo Kim

2013-01-01T23:59:59.000Z

366

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 17, 2012 January 17, 2012 CX-007642: Categorical Exclusion Determination Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007646: Categorical Exclusion Determination Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007645: Categorical Exclusion Determination Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office December 29, 2011 CX-007650: Categorical Exclusion Determination Control Room Consolidation CX(s) Applied: B2.2

367

Operations managers conference: summary of proceedings  

SciTech Connect

The Association for Energy Systems, Operations, and Programming (AESOP) was created to provide Department of Energy (DOE) and DOE-contractor management personnel with a means for acquiring and exchanging information concerning effective management of ADP resources and personnel as well as a variety of computer applications. AESOP serves as a forum for the data processing management of more than 50 DOE offices and private corporations under contract to DOE. AESOP Operations Managers Conferences are held approximately every 18 months. Conference topics include personnel problems, training situations, reorganization plans, and work scheduling. Security and other issues affecting ADP procedures and personnel are also often addressed. Papers published in this volume of the proceedings have been summarized from speeches and discussions that were presented at the seventh AESOP Operations Managers Conference.

None,

1982-02-01T23:59:59.000Z

368

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

369

Nevada Operations Office  

Office of Legacy Management (LM)

Nevada Operations Office Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified as the location of the subject liquid wastes. Numerous readings were made with a hand-held Ludlum Model 125 Micro-R meter, for the purpose of personnel radiation protection walking into the controlled, posted radioactive waste compounds. No readings were above background.

370

User Operation Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS-NSSD-TOF-TD-0002 - R00 SNS-NSSD-TOF-TD-0002 - R00 1 SEQUOIA Operations Manual for Users G.E. Granroth SEQUOIA Lead Instrument Scientist A.I. Kolesnikov SEQUOIA Instrument Scientist L.M. DeBeer-Schmitt SEQUOIA Scientific Associate T.E. Sherline Sample Environment Scientist Revised - May 13, 2013 SNS-NSSD-TOF-TD-0002 - R00 2 Abstract The SEQUOIA Operations Manual for Users presents a description of the SEQUOIA spectrometer located at beamline 17 (BL17) of the Spallation Neutron Source (SNS). It is the intent of this manual to inform the user regarding the SEQUOIA spectrometer and available sample environment, to run experiments, to access and analyze the collected data, and to provide the user with other potentially useful information. The first section serves to describe the components of which the instrument is comprised.

371

DCO Operations Interesting Statistics  

E-Print Network (OSTI)

DCO Operations Interesting Statistics 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Chart by: HANDS DOWN SOFTWARE, www.handsdownsoftware.com 1.00 0.95 0.90 0.85 0.80 0.75 0.70 0.65 0.60 0 is annotated with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE

372

OPERATOR'S MANUAL IMPORTANT NOTES  

E-Print Network (OSTI)

-3 B) LOAD CONNECTION (I) and PAR. 3-3 C) LOAD CONNECTION (II) add the following: Load connectionsMODEL OPERATOR'S MANUAL IMPORTANT NOTES: 1) This manual is valid for the following Model: BOP 20-20, BOP 36-12, BOP 50-8, BOP 72-6, BOP 100-4 BOP 100W, 200W, 400W POWER SUPPLY #12;#12;1 LOAD

Kleinfeld, David

373

Annual work plan for FY 1990  

SciTech Connect

The Office of Inspector General (OIG) has an overall mission to prevent and detect fraud, waste, and mismanagement in Department of Energy (DOE) programs. As part of its responsibility in accomplishing its mission, the DOE Office of Audits publishes an Annual Work Plan'' in September of each year. The prime focus of the plan is to identify opportunities for audits to enhance the effectiveness, efficiency, and integrity of the DOE's programs and operations. Through this plan, we are able to maximize the effectiveness of our resources and to avoid duplicating audit coverage being provided by other audit groups, such as the US General Accounting Office (GAO) to US Department of Energy programs. Such planning is required by Office of Management and Budget Circular A-73 and DOE Order 2321.1. This work plan, in an effort to more realistically plan the year ahead, moves away from the traditional listing of all audits to be undertaken for the year. Only those audits that are to be carried over from the previous fiscal year and those that are to be started in the first quarter of the new fiscal year will be listed. The balance of time available has been allocated to the major program areas for FY 1990, and new audits will be identified and started during the year based on the knowledge gained from completed or in-process audits. This process represents the beginning of our use of long-term multi-year program strategies.

Not Available

1989-09-30T23:59:59.000Z

374

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

375

Public Works Transportation Infrastructure Study  

E-Print Network (OSTI)

and Alleys · Street Lights · Traffic Signals #12;Public Works Transportation Infrastructure Study Minneapolis Infrastructure Study Minneapolis City of Lakes Infrastructure Included in Analysis: · Bridges · Streets Infrastructure Study Minneapolis City of Lakes Existing Inventory & Current Conditions Street Pavement Before

Minnesota, University of

376

Working Paper 6 October 2007  

E-Print Network (OSTI)

and innovation. Its constituent centres include the Research Centre for Social Sciences (RCSS), the ESRC Centre for Social and Economic Research on Innovation in Genomics (Innogen), the Science Studies Unit (SSU in innovation work Nils Markusson Abstract The literature on environmental champions tends to emphasise

377

Working fluid for Rankine cycle  

SciTech Connect

A Rankine cycle working fluid is disclosed containing a mixture of 2,2,3,3tetrafluoropropanol and water, which is low toxic, incombustible, nonexplosive, noncorrosive and stable, and also has a high critical temperature and forms azeotropic-like composition. It is suited for use in a rankine cycle using heat source of low temperature.

Aomi, H.; Enjo, N.

1980-11-11T23:59:59.000Z

378

working with industry Engineering and  

E-Print Network (OSTI)

of interests including: · laser physics · semiconductor optoelectronics · photonics in manufacturing · solar · micromechanics and condition monitoring · renewable energy modelling · carbon capture and storage Our institute to applied systems. We have a wide ranging programme of current work with many industrial companies in key

Painter, Kevin

379

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

| NRC Officials Visit WIPP Tod | NRC Officials Visit WIPP Tod A weekly e-newsletter for the Waste Isolation Pilot Plant team September 25, 2003 The Big Story Recertification - a work in progress Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-25-03 at 7:16 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,044 Total shipments received at WIPP Without EPA approval, WIPP could not have received the first waste shipment in 1999. In 1998, EPA cleared the way for TRU waste disposal when it certified that the WIPP repository would safely contain

380

Work Controls Assessment Plan Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORK CONTROLS WORK CONTROLS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

STANDARD OPERATING PROTOCOLS FOR DECOMMISSIONING  

SciTech Connect

Decommissioning projects at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites are conducted under project-specific decision documents, which involve extensive preparation time, public comment periods, and regulatory approvals. Often, the decision documents must be initiated at least one year before commencing the decommissioning project, and they are expensive and time consuming to prepare. The Rocky Flats Environmental Technology Site (RFETS) is a former nuclear weapons production plant at which hazardous substances and wastes were released or disposed during operations. As a result of the releases, RFETS was placed on the National Priorities List in 1989, and is conducting cleanup activities under a federal facilities compliance agreement. Working closely with interested stakeholders and state and federal regulatory agencies, RFETS has developed and implemented an improved process for obtaining the approvals. The key to streamlining the approval process has been the development of sitewide decision documents called Rocky Flats Cleanup Agreement Standard Operating Protocols or ''RSOPs.'' RSOPs have broad applicability, and could be used instead of project-specific documents. Although no two decommissioning projects are exactly the same and they may vary widely in contamination and other hazards, the basic steps taken for cleanup are usually similar. Because of this, using RSOPs is more efficient than preparing a separate project-specific decision documents for each cleanup action. Over the Rocky Flats cleanup life cycle, using RSOPs has the potential to: (1) Save over 5 million dollars and 6 months on the site closure schedule; (2) Eliminate preparing one hundred and twenty project-specific decision documents; and (3) Eliminate writing seventy-five closure description documents for hazardous waste unit closure and corrective actions.

Foss, D. L.; Stevens, J. L.; Gerdeman, F. W.

2002-02-25T23:59:59.000Z

382

Method and apparatus for removing non-condensible gas from a working fluid in a binary power system  

DOE Patents (OSTI)

Apparatus for removing non-condensible gas from a working fluid utilized in a thermodynamic system comprises a membrane having an upstream side operatively connected to the thermodynamic system so that the upstream side of the membrane receives a portion of the working fluid. The first membrane separates the non-condensible gas from the working fluid. A pump operatively associated with the membrane causes the portion of the working fluid to contact the membrane and to be returned to the thermodynamic system.

Mohr, Charles M. (Idaho Falls, ID); Mines, Gregory L. (Idaho Falls, ID); Bloomfield, K. Kit (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

383

Office of Security Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Physical Protection Office of Physical Protection Bill Dwyer Director, 202-586-7887 Mission The mission of the Office of Physical Protection is to implement and oversee dedicated human resources, processes, and equipment designed to protect personnel and assets entrusted to our care at Department of Energy (DOE) Headquarters facilities. The Office is comprised of dedicated DOE Federal security professionals, Headquarters Protective Force personnel, and Alarms and Access Control Technicians. These security subject matter experts work together to ensure compliance with DOE Safeguards and Security regulations, Interagency Security Committee guidance, and federal laws. The result of this collaboration is a security program designed to ensure a safe and secure working environment for all Headquarters employees.

384

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

385

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

386

Management and Operating Contractors' Subcontract Audit Coverage, IG-0885  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management and Operating Management and Operating Contractors' Subcontract Audit Coverage DOE/IG-0885 April 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 April 17, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Report on "Management and Operating Contractors' Subcontract Audit Coverage" BACKGROUND The Department of Energy (Department) employs 28 Management and Operating (M&O) contractors that perform essential mission work under cost reimbursable contracts. To achieve the Department's mission, M&O contractors often utilize the services of subcontractors, which

387

Protection Program Operations  

Directives, Delegations, and Requirements

The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Cancels DOE M 470.4-2A, DOE M 470.4-3A, and DOE M 470.4-8. Appendix C Safeguards and Security Alarm Management and Control Systems, of DOE M 470.4-2A, is retained and incorporated into this Order as Attachment 3, Annex 1.

2011-06-29T23:59:59.000Z

388

Substances of Abuse and Work  

NLE Websites -- All DOE Office Websites (Extended Search)

SUBSTANCES OF ABUSE SUBSTANCES OF ABUSE AND WORK Mary L. Doyle, MPH, RN, COHN-5/CM DOE Headquarters January 16, 2002 Americans 12 Years and Older Using Dru s or Alcohol in the Past Month 1915 1995 1999 Substance Abuse in Industry * Drug use - associated with higher rates of )>absenteeism )>injury l> medical care utilization )> involuntary separation l> health care costs * Alcohol use in the workplace associated with l> absenteeism l> performance on specific tasks ::... mixed data on other outcomes Americans Over 12 Years Reporting Lifetime (Ever Used) Drug Use "'.11---------11--------l * Aloobol *Airf.Udruc 50.11---------11--------l * Mari- ODd ........ 40.11---------11----&.---l * Cocaiae *llalaciaogoal * Horoia Substance Abuse and Work

389

Working at ORNL | Careers | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

View Open Positions View Open Positions View Postdoctoral Positions Create A Profile Internal applicants please apply here View or update your current application or profile. External applicants Internal applicants Internet Explorer Browser preferred for ORNL applicants. Chrome is not currently supported. For more information about browser compatibility please refer to the FAQs. If you have difficulty using the online application system or need an accommodation to apply due to a disability, please email ORNLRecruiting@ornl.gov or phone 1-866-963-9545 Careers Home | ORNL | Careers | Working at ORNL SHARE Working at ORNL Community and Culture Here at Oak Ridge National Lab we have over 4,000 employees representing more than 80 different countries. Our employees make a difference in the

390

Will our nuclear weapons work?  

NLE Websites -- All DOE Office Websites (Extended Search)

Will our nuclear weapons work? Will our nuclear weapons work? National Security Science magazine Latest Issue:April 2013 All Issues » submit Supercomputers are essential for assessing the health of the U.S. nuclear stockpile Supercomputers provide assurance by simulating nuclear weapons performance March 25, 2013 Graphic of a missile being tested through computer simulation Los Alamos uses supercomputers to make high-resolution 3D simulations that help to assess the health of nuclear weapons like this B-61 bomb. Contact Managing Editor Clay Dillingham Email The nuclear weapons in the U.S. stockpile were designed and built to be replaced with new designs and builds every 10 to 15 years. These weapons have lived beyond their expected lifespans. Supercomputers provide the high-resolution 3D simulations needed for

391

PUREX facility preclosure work plan  

SciTech Connect

This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D).

Engelmann, R.H.

1997-04-24T23:59:59.000Z

392

Visualization and Modeling Working Group  

SciTech Connect

During the 2005 Hurricane season, many consequence predictions were available from 36 to 96 hours before landfalls, via the Department of Energy’s Visualization and Modeling Working Group (VMWG). Real-time data can be tapped by local officials and utilities, and can also be accessed for post-event regulatory audits. An overview of VMWG’s models, results and uses will be presented.

Fernandez, S.J. (LANL); Dodrill, K.A.

2007-03-01T23:59:59.000Z

393

TRUTeamWorks 06-24-04  

NLE Websites -- All DOE Office Websites (Extended Search)

anxiously awaiting the results. So far, the process has been very positive. "Conduct of operations, like safety, is a culture," explains Steve Youngerman, deputy operations...

394

How Power Marketing Administrations Market Power and Work with Tribes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How Power Marketing Administrations Market Power and Work with How Power Marketing Administrations Market Power and Work with Tribes Webinar How Power Marketing Administrations Market Power and Work with Tribes Webinar April 24, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. The country's federal Power Marketing Administrations (PMAs) have valuable generation and transmission assets and have the potential to promote renewable energy development within their respective footprints. Get information on PMA assets and operations, examples of past cooperation with Tribes, and how to work with PMAs to promote future economic growth

395

Extending quantum operations  

SciTech Connect

For a given set of input-output pairs of quantum states or observables, we ask the question whether there exists a physically implementable transformation that maps each of the inputs to the corresponding output. The physical maps on quantum states are trace-preserving completely positive maps, but we also consider variants of these requirements. We generalize the definition of complete positivity to linear maps defined on arbitrary subspaces, then formulate this notion as a semidefinite program, and relate it by duality to approximative extensions of this map. This gives a characterization of the maps which can be approximated arbitrarily well as the restriction of a map that is completely positive on the whole algebra, also yielding the familiar extension theorems on operator spaces. For quantum channel extensions and extensions by probabilistic operations we obtain semidefinite characterizations, and we also elucidate the special case of Abelian inputs or outputs. Finally, revisiting a theorem by Alberti and Uhlmann, we provide simpler and more widely applicable conditions for certain extension problems on qubits, and by using a semidefinite programming formulation we exhibit counterexamples to seemingly reasonable but false generalizations of the Alberti-Uhlmann theorem.

Heinosaari, Teiko [Turku Centre for Quantum Physics, Department of Physics and Astronomy, University of Turku (Finland); Jivulescu, Maria A. [Department of Mathematics, University Politehnica Timisoara, 300006 Timisoara (Romania); Reeb, David; Wolf, Michael M. [Department of Mathematics, Technische Universitaet Muenchen, 85748 Garching (Germany)

2012-10-15T23:59:59.000Z

396

WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM  

SciTech Connect

This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energy markets.

Allan Jones

2003-09-01T23:59:59.000Z

397

Pacific Northwest National Laboratory Operated  

Office of Legacy Management (LM)

Pacific Pacific Northwest National Laboratory Operated by Battelle for the U .S. D ep artm ent of Energy PNWD-3914 Monticello Mill Tailings Site Macroinvertebrate Sampling for 2007 A.L. Bunn R.P. Mueller J.M. Brandenberger D .M. Wellman February 2008 Prepared for the U.S. Department of Energy under Contract DE-AC13-02GJ79491 DISCLAIMER This repon was prepared as an accoun t of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereo f, no r Battelle Memorial Institute, no r any of their employees, makes an y warranty, express or implie d, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, ap paratus, produ ct, or p roce ss di sclos ed, or represen ts that its use would not in frin ge privat ely owned rights . Reference herein to any specific comm ercial product, process,

398

Operation Prognostics and Operation Diagnostics—Technologies for Enhanced Operations and Controls  

E-Print Network (OSTI)

PROGNOSTICS AND OPERATION DIAGNOSTICS ? NEW TECHNOLOGIES FOR ENHANCED OPERATIONS AND CONTROLS OLIVER BAUMANN, PRESIDENT 202-608-1334 EBERT & BAUMANN CONSULTING ENGINEERS, WASHINGTON D.C. The Methodologies of Operation Prognostics and Operation... Diagnostics have been developed by the authors over the last 8 to 10 years. Today, these methodologies have been combined in an integrated approach for advanced building commissioning. Within Operation Diagnostics, advanced visualization techniques...

Baumann, O.

399

U.S. CMS - U.S. CMS @ Work - Data and Computing - Data Operations - Data  

NLE Websites -- All DOE Office Websites (Extended Search)

User Space at US CMS Tier-2 Centers and the FNAL LPC User Space at US CMS Tier-2 Centers and the FNAL LPC Overview When running jobs on large amounts of data, many users will need to write output files of substantial size -- larger than can be accommodated by the grid output sandbox. Additionally, it can be very useful to write this output in a way that it can be read back in easily by subsequent grid jobs. CMS has a mechanism for this. Computing sites will support a /store/user area in their storage systems to host user-generated data. CRAB can be instructed to write job outputs to this area through the SRM interface. Through the magic of the grid, no matter where your job actually runs, and no matter where the output is created, the output can be automatically transferred to whatever system is hosting your own /store/user area. Then,

400

Mike Seibert Operating a rover on Mars is tricky even when the rover is working correctly.  

E-Print Network (OSTI)

, you throw them a curve ball, maybe some danger, maybe an anomoly. Jennifer Herman A heater that front wheel. Scott Lever A massive dust storm. Mark Maimone We had to learn to drive with broken

Waliser, Duane E.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

U.S. CMS - U.S. CMS @ Work - Detector Maintenance and Operations Subproject  

NLE Websites -- All DOE Office Websites (Extended Search)

HCAL Announcements, Documentation, and Resources HCAL Announcements, Documentation, and Resources Forward Pixels SiTracker ECAL HCAL Endcap Muon System TriDAS (This page last updated August 2000, although the 1997 version of the TDR was added in July 2010.) [See also HCAL web pages at Maryland and Boston.] HCAL Review Documents HCAL Project Organization Chart (13 Kb gif file) [ps: 46 Kb] HCAL Meeting Announcements, Agendas, and Minutes HCAL Technical Design Report HCAL Drawings: 3-D and perspective barrel HCAL views. HCAL Trigger: Calorimeter trigger algorithm specifications. HCAL Display Resources: transparencies, misc. figures, ... HCAL Documents: Technical Proposal, DRDC Notes, and Papers. CMS Technical Notes: HCAL, HCAL-HV. HCAL Page on CMSDOC WWW Server at CERN HCAL HF Document Server from the University of Iowa

402

Operation Diagnostics: Use of Visualization Techniques and Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Diagnostics: Use of Visualization Techniques and Operation Operation Diagnostics: Use of Visualization Techniques and Operation Patterns to Verify and Optimize Dynamic Building and System Operation Speaker(s): Oliver Baumann Date: December 7, 2004 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Peng Xu Building automation systems (BAS) and building energy management systems (BEMS) have been used in modern edifices for the last 2 decades. These systems measure, process, and monitor a huge amount of data to operate the building and systems more or less properly. Often, the data is only used to signal failures or break-downs of systems or components. Further information of the data to analyze and diagnose the building operation is not used due to the lack of analysis methods and tools. Within the Operation Diagnostics, different visualization techniques are applied to

403

ENERGY CONSUMPTION OF ICT INFRASTRUCTURES: AN OPERATOR’S VIEWPOINT  

Science Journals Connector (OSTI)

Abstract (40-Word Limit): The digital revolution has resulted up to now in the need for increasingly powerful and energy-hungry infrastructures. We give an operator’s viewpoint...

Gosselin, Stéphane W; Saliou, Fabienne; Bourgart, Fabrice; Le Rouzic, Esther; Le Masson, Stéphane; Gati, Azeddine

404

Transportation External Coordination Working Group:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accomplishments and Future Accomplishments and Future Transportation External Coordination Working Group Meeting Phoenix, AZ Judith A. Holm, Office of National Transportation Office of Civilian Radioactive Waste Management April 4, 2005 TEC MEMBER ORGANIZATIONS American College of Emergency Physicians (ACEP) American Nuclear Society (ANS) Association of American Railroads (AAR) Brotherhood of Locomotive Engineers and Trainmen (BLET) Commercial Vehicle Safety Alliance (CVSA) Conference of Radiation Control Program Directors, Inc. (CRCPD) Council of Energy Resource Tribes (CERT) Council of State Governments-Eastern Regional Conference (CSG-ERC) Council of State Governments-Midwestern Office (CSG-MW) Council on Radionuclides and Radiopharmaceuticals (CORAR) Dangerous Goods Advisory Council (DGAC)

405

Transportation External Coordination Working Group:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

External Coordination External Coordination Working Group: Background and Process Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 TEC History * DOE's Office of Environmental Management (EM) and Office of Civilian Radioactive Waste Management (OCRWM) formed TEC in 1992 * EM & RW developed MOU and TEC charter in 1992 - Other DOE program offices joined in 1993-94 * Other agencies (DOT, FRA, NRC, EPA) have been active participants Meeting Locations 1992-present Some Founding Principles * TEC concept centered on unique stakeholder accountability principles - Participation by key responsible parties in technical/policy issue discussion and resolution results in increased confidence and more efficient business decisions * Ultimate goal: develop multi-year set of

406

QuarkNet at Work  

NLE Websites -- All DOE Office Websites (Extended Search)

QuarkNet at Work Information for Active Mentors & Teachers     QuarkNet Home - Information - Calendar - Contacts - Projects - Forms: EoI - Teachers Information Active Centers Calendar Contacts Expectations: for Teachers, for Mentors Information on Other Funding Sources Program Overview Support: for Teachers, for Centers Staff Job Description Activities Essential Practices - Teaching with Inquiry (word.doc) Classroom Activities e-Labs: CMS - Cosmic Ray Boot Camp Project Activities Databases: Data Entry (password only) 2012 Center Reporting Resources Important Findings from Previous Years Mentor Tips Associate Teacher Institute Toolkit Print Bibliography - Online Resources Imaging Detector Principles of Professionalism for Science Educators - NSTA position

407

Jordan cohomology for operator algebras Great Plains Operator Theory Symposium  

E-Print Network (OSTI)

Jordan cohomology for operator algebras Great Plains Operator Theory Symposium Kansas State) Jordan cohomology for operator algebras 1 / 23 #12;Outline · Jordan Derivations · Jordan Weak*-Amenability · Jordan 2-cocycles NOTE: Jordan can mean Jordan algebra or Jordan triple (depending on my fancy) Bernard

Russo, Bernard

408

TYPE OF OPERATION  

Office of Legacy Management (LM)

Owner c:ontacted Owner c:ontacted TYPE OF OPERATION ----------------_ jJ Research & Development 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process i Theoretical Studies Sample & Analysis B Production 0 Disposal/Storage $r Prime 0 Subcontract& 0 Purchase Order 0 Facility Type 0 Manufacturing 0 University 0 Research Organization a Other information (i.e., cost + fixed fern, unit price,' time & mate ~r~~-r~~tf~-_~_-_~-~f-~~J~ d ial, etc)_kl/Jlfits ---- -7---- -- Contract/Purchase Order # w?@7-e?-b $ 6, i;,_~~~~~----------------- - ----- C_O!!IF!KXYE-PEELEg: -lTlL-/L?~J --------------------------- OWNERSHXP: AEWHEC AEC/HED' GOVT GB' JT SiXiRACTOR CONiRkCiGR WEE LEAs_EE a!!!%? IEEE!? --------_ ..---LEASED ._ OWNED LANDS BUILDINGS EQUIPMENT

409

TYPE OF OPERATION  

Office of Legacy Management (LM)

OWNEF? (S) OWNEF? (S) Current: ____ LcrcJksLG! _________ Owner contacted n yes WI-IO; if yes, date contacted-- TYPE OF OPERATION ----_-------_---- m Research & Development Cl Pilot Scale Cl Disposal/Storaqe TYPE OF CDNTRACT ---__------__--- q Prime 0 Subcnntractor Cl Purchase Order 0 Other infcrmation (i.e., cnst + fixed fee, unit price, time 84 materi+, e.tc) v-7Y07-&G-W ---------------------------- Contract/Pur&aae Order # 0 -?+7- FJc-(CL --___--------~----_______________ CONTRACTING PEXIOD: fl& ,&I;'"'-?;': (&e-?)_-- ' ------------------ OWNERSHIP: AEC/MED GEC/MED SOVT GOVT CONTRACTOR CCNTRACTOR OWNE3 LEASE3 OWNE3 LEASED OWNE3 ----- ------ ----- ------ -__------- LE.352 LANDS u u q BUILDINGS EQUIPMENT 0 FINAL PRODUCT WASTE G RESIDUE a

410

TYPE OF OPERATION  

Office of Legacy Management (LM)

3!NEEi_S1 3!NEEi_S1 past: -~~~-~~~~~-~~~---------- current: ------------_------------- Owner contacted q yes g no; if ye=, date contacted TYPE OF OPERATION --~~__--~-~~~---- 5 Research & Development 5 Facility Type 0 Production scale testing c1 Pilot Scale 0 Bench Scale Process z Theareti cal Studi es Sample Sr Analysis 0 Production D Disposal/Storage TYPE OF CONTRACT ---------------- 0 Manufacturing 0 University 0 Research Clrganization B Government Cpanaored Faci 1 i ty 0 Other ~~---~~---_--~~-----_ a Prime 13 Subcontract& D PurcSase Order 0 Other information (i.e., cost + fixed fee, unit price, time & material, +z) ----_----------------------- Cantract/Purchaae Order #-d-z=&-/) -2_7~-------------Is_------------ PERIOD: CONTRACTING I%~(?) - 1465

411

Albuquerque Operations Office  

Office of Legacy Management (LM)

%r © J~4 %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from inactive uranium mill sites. Evaluation of your property identified above has revealed the presence of residual radioactive material in excess of standards established by the Environmental Protection Agency (EPA). Therefore, your property has been formally included by DOE for remedial action in the Uranium Mill Tailings

412

RH Packaging Operations Manual  

SciTech Connect

This procedure provides operating instructions for the RH-TRU 72-B Road Cask, Waste Shipping Package. In this document, ''Packaging'' refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). ''Package'' refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Loading of the RH 72-B cask can be done two ways, on the RH cask trailer in the vertical position or by removing the cask from the trailer and loading it in a facility designed for remote-handling (RH). Before loading the 72-B cask, loading procedures and changes to the loading procedures for the 72-B cask must be sent to CBFO at sitedocuments@wipp.ws for approval.

Washington TRU Solutions LLC

2003-09-17T23:59:59.000Z

413

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 1 Safety Solutions and Pollution Prevention Proposals Congratulations to Barbara Roland of the Nonproliferation and National Security Dept.! Barbara's Safety Solution proposal has been funded. To improve personnel safety in Building 197 during emergency situations, she suggested that pathway markers be positioned on the hallway walls to help locate the Indoor Assembly Areas and Evacuation routes. Light mo- tion detectors for "common areas" in several of our buildings was also funded. This idea sprung from a suggestion received during our Director- ate Safety Stand Down in 2009. This will improve safety and conserve energy too. Remember to send us your suggestions for next year!

414

Operational Security (OPSEC) Reminder | Department of Energy  

Office of Environmental Management (EM)

Operational Security (OPSEC) Reminder Operational Security (OPSEC) Reminder June 3, 2014 - 1:24pm Addthis Operational Security (OPSEC) Reminder Operational Security (OPSEC)...

415

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

16/03 16/03 | Shipments expected this week: ANL-E (2) , RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 16, 2003 The Big Story EM-6 to review WIPP baseline Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/16/03 at 7:05 a.m.) Shipments scheduled to arrive at WIPP this week 19 Total shipments received at WIPP 2,095 A team from the DOE Office of Project Management, EM-6, will be on site next week to review the WIPP baseline and the integration of that baseline with the National TRU

416

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

3/03 3/03 | Shipments expected this week: RFETS (11), SRS (4), Hanford (2) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 23, 2003 Sealed sources: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/23/03 at 7:06 a.m.) Shipments scheduled to arrive at WIPP this week 17 Total shipments received at WIPP 2,115 Sealed sources have been a topic of discussion lately. Here are answers to some of the questions raised by this topic:

417

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, 9/11/03 | Total shipments received at WIPP: 2003 | Shipments expected this Thursday, 9/11/03 | Total shipments received at WIPP: 2003 | Shipments expected this A weekly e-newsletter for the Waste Isolation Pilot Plant team September 11, 2003 The Big Story 2003 in 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-11-03 at 10 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,003 Total shipments received at WIPP The 2003 rd waste shipment arrived at the WIPP site today (Thursday, September 11) from Hanford. It is highly fitting that

418

file://\\Bellview\TeamWorks\TRUTeamWorks.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

Total shipments received at WIPP as of 8-25-03: 1,956 | Shipments expected this week: Hanford Total shipments received at WIPP as of 8-25-03: 1,956 | Shipments expected this week: Hanford A weekly e-newsletter for the Waste Isolation Pilot Plant team August 25, 2003 The Big Story INEEL drum fire and Senate Bill S. 1424: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e -mail. WIPP Shipments (as of 8-25-03) 19 Shipments scheduled to arrive at WIPP this week 1,956 Total shipments received at WIPP Some recent media coverage has created some confusion in the public about the

419

Contractor Work Planning and Control Lessons Learned from DOE and International Projects  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

420

Multigrid Preconditioning for the Overlap Operator in Lattice QCD  

E-Print Network (OSTI)

The overlap operator is a lattice discretization of the Dirac operator of quantum chromodynamics, the fundamental physical theory of the strong interaction between the quarks. As opposed to other discretizations it preserves the important physical property of chiral symmetry, at the expense of requiring much more effort when solving systems with this operator. We present a preconditioning technique based on another lattice discretization, the Wilson-Dirac operator. The mathematical analysis precisely describes the effect of this preconditioning in the case that the Wilson-Dirac operator is normal. Although this is not exactly the case in realistic settings, we show that current smearing techniques indeed drive the Wilson-Dirac operator towards normality, thus providing a motivation why our preconditioner works well in computational practice. Results of numerical experiments in physically relevant settings show that our preconditioning yields accelerations of up to one order of magnitude.

Brannick, James; Kahl, Karsten; Leder, Björn; Rottmann, Matthias; Strebel, Artur

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Multigrid Preconditioning for the Overlap Operator in Lattice QCD  

E-Print Network (OSTI)

The overlap operator is a lattice discretization of the Dirac operator of quantum chromodynamics, the fundamental physical theory of the strong interaction between the quarks. As opposed to other discretizations it preserves the important physical property of chiral symmetry, at the expense of requiring much more effort when solving systems with this operator. We present a preconditioning technique based on another lattice discretization, the Wilson-Dirac operator. The mathematical analysis precisely describes the effect of this preconditioning in the case that the Wilson-Dirac operator is normal. Although this is not exactly the case in realistic settings, we show that current smearing techniques indeed drive the Wilson-Dirac operator towards normality, thus providing a motivation why our preconditioner works well in computational practice. Results of numerical experiments in physically relevant settings show that our preconditioning yields accelerations of up to one order of magnitude.

James Brannick; Andreas Frommer; Karsten Kahl; Björn Leder; Matthias Rottmann; Artur Strebel

2014-10-27T23:59:59.000Z

422

Electrochromic Glazings: How they Work  

NLE Websites -- All DOE Office Websites (Extended Search)

How they Work How they Work Electrochromic glazings have great potential to improve the energy efficiency and occupant comfort afforded by architectural windows. These smart windows can dynamically control light transmission by windows in buildings, automobiles, and aircraft. Electrochromic glazings are the most significant members of a family of chromogenic light-control technologies that includes large-area dispersed liquid crystals, dispersed particle windows, and photochromic and thermochromic materials. Electrochromic devices represent the most versatile window technology of this type, exhibiting the best combination of switching properties for chromogenic window applications. Electrochromic glazings typically have a change in visible light transmission from 10% to 70%, moderately fast switching times, and low dc power consumption. These glazings have memory, so they only need power to make a change in transmission. Electrochromic technology can be coupled with smart control systems to give constant lighting levels, blending artificial lighting with daylighting for improved building energy efficiency. Energy simulations of office buildings indicate that smart windows with lighting controls in arid climates can provide 30-40% energy savings over conventional windows. Savings are realized in cooling, lighting, and peak utility electric loads. Other benefits include smaller heating, ventilating, and air-conditioning (HVAC) systems and greater thermal and visual comfort.

423

How the Artificial Retina Works  

NLE Websites -- All DOE Office Websites (Extended Search)

the Artificial Retina Works the Artificial Retina Works Artificial Retina Diagram Normal vision begins when light enters and moves through the eye to strike specialized photoreceptor (light-receiving) cells in the retina called rods and cones. These cells convert light signals to electric impulses that are sent to the optic nerve and the brain. Retinal diseases like age-related macular degeneration and retinitis pigmentosa destroy vision by annihilating these cells. With the artificial retina device, a miniature camera mounted in eyeglasses captures images and wirelessly sends the information to a microprocessor (worn on a belt) that converts the data to an electronic signal and transmits it to a receiver on the eye. The receiver sends the signals through a tiny, thin cable to the microelectrode array, stimulating it to emit pulses. The artificial retina device thus bypasses defunct photoreceptor cells and transmits electrical signals directly to the retina's remaining viable cells. The pulses travel to the optic nerve and, ultimately, to the brain, which perceives patterns of light and dark spots corresponding to the electrodes stimulated. Patients learn to interpret these visual patterns.

424

Mixed Waste Working Group report  

SciTech Connect

The treatment of mixed waste remains one of this country`s most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country`s largest mixed waste generator, responsible for 95 percent of the Nation`s mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE`s earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies.

Not Available

1993-11-09T23:59:59.000Z

425

Symmetry of the Riemann Operator  

E-Print Network (OSTI)

Chaos quantization conditions, which relate the eigenvalues of a Hermitian operator (the Riemann operator) with the non-trivial zeros of the Riemann zeta function are considered, and their geometrical interpretation is discussed.

B. Aneva

2008-04-10T23:59:59.000Z

426

CONTRACTS AND PROCUREMENT OPERATIONS MANUAL  

E-Print Network (OSTI)

CONTRACTS AND PROCUREMENT OPERATIONS MANUAL California State University, Fullerton Division University, Fullerton Contracts and Procurement P a g e | 1 Table of Contents ALPHABETICAL INDEX OF TERMS.........................................................................................................................14 CONTRACTS AND PROCUREMENT OPERATIONS

de Lijser, Peter

427

Idle Operating Total Stream Day  

U.S. Energy Information Administration (EIA) Indexed Site

3 3 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 11 10 1 1,293,200 1,265,200 28,000 1,361,700 1,329,700 32,000 ............................................................................................................................................... PAD District I 1 1 0 182,200 182,200 0 190,200 190,200 0 ................................................................................................................................................................................................................................................................................................ Delaware......................................

428

DOE, Invensys Operations Management to Develop, Deploy Operator Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, Invensys Operations Management to Develop, Deploy Operator DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants December 10, 2012 - 12:00pm Addthis Washington, DC - A new U.S. Department of Energy (DOE) cooperative research and development agreement to develop, test, and deploy a dynamic simulator and operator training system (OTS) could eventually help commercialize important carbon capture technologies at the nation's power plants. The high-fidelity, real-time OTS for a generic supercritical once-through (SCOT) pulverized-coal power plant will be installed at the National Energy Technology Laboratory's (NETL's) Advanced Virtual Energy Simulation

429

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

430

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

431

Operating Reserves and Variable Generation  

SciTech Connect

This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

Ela, E.; Milligan, M.; Kirby, B.

2011-08-01T23:59:59.000Z

432

OPERATING SYSTEM CONCEPTS Avi Silberschatz  

E-Print Network (OSTI)

OPERATING SYSTEM CONCEPTS Avi Silberschatz Department of Computer Sciences University of Texas & Peter Galvin CHAPTER 1: INTRODUCTION . What is an operating system? . Early Systems . Simple Batch Systems . Distributed Systems . Real­Time Systems Operating System Concepts, Addison­Wesley � 1994

Schmidt, Douglas C.

433

Network Operating Systems Partha Dasgupta  

E-Print Network (OSTI)

Network Operating Systems Partha Dasgupta Department of Computer Science and Engineering Arizona of Electrical Engineering] 1. Introduction Network Operating Systems extend the facilities and services provided by computer operating systems to support a set of computers, connected by a network. The environment managed

Dasgupta, Partha

434

LCLS Operating Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

435

Toolbox Safety Talk Articulating Boom Work Platforms  

E-Print Network (OSTI)

Toolbox Safety Talk Articulating Boom Work Platforms Environmental Health & Safety Facilities sign-in sheet to Environmental Health & Safety for recordkeeping. Articulating boom work platforms Articulating Boom Work Platforms Environmental Health & Safety Facilities Safety & Health Section 395 Pine Tree

Pawlowski, Wojtek

436

Covariance evaluation work at LANL  

SciTech Connect

Los Alamos evaluates covariances for nuclear data library, mainly for actinides above the resonance regions and light elements in the enUre energy range. We also develop techniques to evaluate the covariance data, like Bayesian and least-squares fitting methods, which are important to explore the uncertainty information on different types of physical quantities such as elastic scattering angular distribution, or prompt neutron fission spectra. This paper summarizes our current activities of the covariance evaluation work at LANL, including the actinide and light element data mainly for the criticality safety study and transmutation technology. The Bayesian method based on the Kalman filter technique, which combines uncertainties in the theoretical model and experimental data, is discussed.

Kawano, Toshihiko [Los Alamos National Laboratory; Talou, Patrick [Los Alamos National Laboratory; Young, Phillip [Los Alamos National Laboratory; Hale, Gerald [Los Alamos National Laboratory; Chadwick, M B [Los Alamos National Laboratory; Little, R C [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

437

Isotope Work at Oak Ridge  

Science Journals Connector (OSTI)

The special training division of the Oak Ridge Institute of Nuclear Studies has announced that three additional courses in the techniques of using radioisotopes in research have been scheduled during the winter and spring of 1951. They are to be held from January 8th to February 2nd from February 19th to March 16th and from April 16th to May 11th. Designed to acquaint research workers with the safe and efficient use of radioisotopes the courses include laboratory work lectures and special?topic seminars. Experiments cover such matters as the use and calibration of instruments purification and separation of radioactive materials from inert and other radioactive materials and pile activation technology. The seminars cover various biological and medical uses of radioisotopes and the design of radiochemical laboratories.

C. P. Keim; H. W. Savage; Boyd Weaver

1951-01-01T23:59:59.000Z

438

Fuel Cell Technologies Office: Transport Modeling Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Transport Modeling Working Group Transport Modeling Working Group The Transport Modeling Working Group meets twice per year to exchange information, create synergies, share experimental and computational results, and collaboratively develop methodologies for and understanding of transport phenomena in polymer electrolyte fuel cell stacks. Its members include principle investigators and supporting personnel from transport-related projects funded by the U.S. Department of Energy (DOE). Learn more about DOE research activities can be found in the Multi-Year Research, Development, and Demonstration Plan. Description Technical Targets Meetings Contacts Description Fuel cell operation relies on effective mass transport of species through individual components and across the interfaces between components. Among these species are hydrogen, oxygen, water, protons, and electrons. Transport behavior is a function of operating conditions and component properties such as microstructure and surface properties. Understanding and optimizing the controlling transport phenomena are critical to the efficient and cost-effective operation of polymer electrolyte fuel cells. A better understanding of mass transport in the fuel cell, especially of water, has the potential to lead to improved designs and more efficient systems.

439

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

9/03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | 9/03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 9, 2003 The Big Story It's a whole new "WIPP Experience" Topics Characterization News Transportation News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 10/9/03 at 7:24 a.m.) Shipments scheduled to arrive at WIPP this week 18 Total shipments received at WIPP 2,081 If you haven't been to the SWB lately, you are in for a big surprise. The lobby sports a new look these days, complete with banners and updated exhibits. And the new look isn't just

440

file://\\Bellview\TeamWorks\TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

30/03 Shipments expected this week: RFETS (11), SRS (4), Hanford (2) 30/03 Shipments expected this week: RFETS (11), SRS (4), Hanford (2) A weekly e-newsletter for the Waste Isolation Pilot Plant team October 30, 2003 ARROW-PAK Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 10/30/03 at 6:59 a.m.) Shipments scheduled to arrive at WIPP this week 17 Total shipments received at WIPP 2,129 You've heard of the TRUPACT-II, the pipe overpack, the RH-72B and even the 10- 160B. But have you heard about the ARROW-PAK? ARROW-PAK is a transportation container designed to contain and transport high-wattage TRU waste.

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Opportunities for health and safety professionals in environmental restoration work  

SciTech Connect

The safety of workers in waste management and in environmental restoration work is regulated in large part by the Occupational Safety and Health Administration (OSHA). Many of the OSHA rules are given in Part 1910, Occupational Safety and Health Standards, of Title 29 of the Code of Federal Regulations (CFR). Section 120 of 29 CFR 1910 specifically addresses hazardous waste operations and emergency response operations. The remainder of this discussion focuses on clean-up operations. The purpose of this paper is to review areas of employment opportunity in environmental restoration work for health and safety professionals. Safety and health risk analyses are mentioned as one area of opportunity, and these analyses are required by the standards. Site safety and health supervisors will be needed during field operations. Those who enjoy teaching might consider helping to meet the training needs that are mandated. Finally, engineering help both to separate workers from hazards and to improve personal protective equipment, when it must be worn, would benefit those actively involved in environmental restoration activities.

Norris, A.E.

1991-01-01T23:59:59.000Z

442

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

October, 2011 October, 2011 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 2 October is National Fire Safety Month Did you know that Fire Prevention Week was established to commemorate the Great Chicago Fire, the tragic 1871 conflagration that killed more than 250 people, left 100,000 homeless, destroyed more than 17,400 structures and burned more than 2,000 acres. The fire began on October 8, but continued into and did most of its damage on October 9, 1871. According to popular legend, the fire broke out after a cow - belonging to Mrs. Catherine O'Leary - kicked over a lamp, setting first the barn, then the whole city on fire. While the Great Chicago Fire was the best-known blaze to start during this fiery two-day stretch,

443

Drilling operations change gear  

SciTech Connect

Predicts that several technological developments (e.g. measurement-while-drilling tools, computer data-gathering systems, improved drill bits, muds, downhole mud motors, and more efficient rigs) will have a major effect on drilling operations in the not-too-distant future. While several companies manufacture MWD systems and most can boast of successful runs, the major problem with the MWD system is cost. Manufacturers continue to make advances in both turbine and positive displacement mud motors. As the life span of downhole mud motors improves, these motors can economically compete with a rotary rig in drilling certain straight-hole intervals. Prototype bit designs include the use of lasers, electronic beams, flames, sparks, explosives, rocket exhaust, chains, projectiles, abrasive jets, and high-pressure erosion. Because drilling fluids are taking a large share of the drilling budget, mud engineers are trying to optimize costs, while maintaining well bore stability and increasing penetration rates. Many companies are taking the strategy of designing the simplest mud program possible and increasing additives only as needed. Air and foam drilling techniques are gaining attention. Concludes that as crude oil prices increase and the rig count begins to rebound, attention will once again turn to drilling technology and methodology.

Moore, S.D.

1982-08-01T23:59:59.000Z

444

Volume II - Accident and Operational Safety Analysis Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

208-2012 208-2012 July 2012 DOE HANDBOOK Accident and Operational Safety Analysis Volume II: Operational Safety Analysis Techniques U.S. Department of Energy Washington, D.C. 20585 NOT MEASUREMENT SENSITIVE DOE-HDBK-1208-2012 i ACKNOWLEDGEMENTS This Department of Energy (DOE) Accident and Operational Safety Analysis Handbook was prepared under the sponsorship of the DOE Office of Health Safety and Security (HSS), Office of Corporate Safety Programs, and the Energy Facility Contractors Operating Group (EFCOG), Industrial Hygiene and Safety Sub-group of the Environmental Health and Safety Working Group. The preparers would like to gratefully acknowledge the authors whose works are referenced in this document, and the individuals who provided valuable technical insights and/or specific

445

Fuel Cell Technologies Office: Catalysis Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Catalysis Working Catalysis Working Group to someone by E-mail Share Fuel Cell Technologies Office: Catalysis Working Group on Facebook Tweet about Fuel Cell Technologies Office: Catalysis Working Group on Twitter Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Google Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Delicious Rank Fuel Cell Technologies Office: Catalysis Working Group on Digg Find More places to share Fuel Cell Technologies Office: Catalysis Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts Quick Links Hydrogen Production Hydrogen Delivery Hydrogen Storage Fuel Cells Technology Validation Manufacturing Codes & Standards Education Systems Analysis

446

How Distributed Wind Works | Department of Energy  

Energy Savers (EERE)

Basics How Distributed Wind Works How Distributed Wind Works Residential Small wind turbines can be used in residential settings to directly offset electricity usage using net...

447

Transportation Protocols Working Group First Conference Call...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Call March 1, 1999 Conference Call Summary The first conference call of the Transportation External Coordination Working Group (TECWG) DOE Transportation Protocols Working...

448

Working at EERE | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employment Opportunities Working at EERE Working at EERE As a model employer and diversityinclusion leader, we treat people as our greatest asset at the Office of Energy...

449

Three small businesses selected for environmental work  

NLE Websites -- All DOE Office Websites (Extended Search)

work Three small businesses selected for environmental work ARS Cavanagh Environmental Services, LLC; Portage, Inc.; and Navarro Research & Engineering, Inc. awarded a master...

450

Earth Day event showcases LANL energy work  

NLE Websites -- All DOE Office Websites (Extended Search)

Earth Day showcases energy work Earth Day event showcases LANL energy work The public is invited to learn about projects in energy conservation, generation, research, and...

451

Training Work Group Charter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Charter Training Work Group Charter The Training Work Group fosters improvements in the quality, efficacy, and delivery of DOE safety training, and realizes significant...

452

California Working Natural Gas Underground Storage Capacity ...  

Gasoline and Diesel Fuel Update (EIA)

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

453

California Working Natural Gas Underground Storage Capacity ...  

U.S. Energy Information Administration (EIA) Indexed Site

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

454

Working with CFTF | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

CFTF Working with CFTF CFTF | Carbon Fiber Technology Facility Home | User Facilities | CFTF | Working with CFTF SHARE Low-Cost Carbon Fiber Available to US Manufacturers for...

455

Federal Utility Partnership Working Group Utility Partners  

Energy.gov (U.S. Department of Energy (DOE))

Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

456

Chemically Reactive Working Fluids | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chemically Reactive Working Fluids for the Capture and Transport of Concentrated Solar Thermal Energy for Power Generation Chemically Reactive Working Fluids SunShot CSP...

457

NREL: Water Power Research - Working with Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with Us NREL works with industry in a public-private contracting environment to research, design, and build advanced water power technologies. NREL's National Wind...

458

Work Schedules | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

job performance, improve morale and help reduce work-related stress, as well as reduce air pollution and traffic congestion. Participation in either the alternate work schedule...

459

The Nachos Instructional Operating System Wayne A. Christopher, Steven J. Procter, and Thomas E. Anderson  

E-Print Network (OSTI)

The Nachos Instructional Operating System Wayne A. Christopher, Steven J. Procter, and Thomas E operating systems at an undergraduate level, it is very important to provide a project that is realistic enough to show how real operating systems work, yet simple enough that the students can understand

Anderson, Tom

460

Robotics and Manufacturing Automation Laboratory (Mechanical Eng'g Dept.) STANDARD OPERATING PROCEDURE (SOP)  

E-Print Network (OSTI)

Standard Operating Procedure b) RMM #300 Safety Orientation and Training Program c) RMM #309 Laboratory instructions listed in the CRS F3 Robot System User Guide. 2. The operator should only access the robot arm's working space when the robot arm power is turned off. 3. When operating the robot arm always have

Thompson, Michael

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Operations & Maintenance Best Practices Guide: Chapter 3  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

462

Liens for Oil and Gas Operations (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

This section contains regulations concerning lien allowances made to operators of oil and gas operations.

463

DIFFERENCE OF COMPOSITION OPERATORS OVER THE HALF-PLANE  

E-Print Network (OSTI)

of the difference C - C of two composi- tion operators. In the setting of the unit disk D, all composition operators; Half-plane. B. R. Choe was supported by NRF(2013R1A1A2004736) of Korea and H. Koo was supported by NRF Bergman spaces over H. We first recall the spaces we work on. For > -1, put dA(z) := c(Im z) dA(z) where

Choe, Boo Rim

464

EMSL 2008 Operational Review  

SciTech Connect

The William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a national user facility that contains state-of-the-art instrumentation and expert resources available for use by researchers from academia, industry, and the national laboratory system. The facility is supported by the U.S. Department of Energy’s (DOE) Biological and Environmental Research Program, but the research conducted within the facility benefits many funding agencies, including other branches of DOE, the National Institutes of Health, the National Science Foundation, and the Department of Defense. EMSL requires the continued funding and support of its stakeholders and clients to continue to grow its mission, build its reputation as a sought-after national user facility with cutting-edge capabilities, and attract high-profile users who will work to solve the most critical scientific challenges that affect DOE and the nation. In this vein, this document has been compiled to provide these stakeholders and clients with a review document that provides an abundance of information on EMSL’s history, current research activities, and proposed future direction.

Campbell, Allison A.

2008-08-12T23:59:59.000Z

465

Working Memory Overload: Fronto-Limbic Interactions and Effects on Subsequent Working Memory Function  

E-Print Network (OSTI)

involvement in human working memory. Neuroimage, 5(1), 49–constraints in working memory as revealed by function- alin a nonspatial working memory task with functional MRI.

Yun, Richard J.; Krystal, John H.; Mathalon, Daniel H.

2010-01-01T23:59:59.000Z

466

Oak Ridge Operations PO. Box E  

Office of Legacy Management (LM)

PO. Box E PO. Box E Oak Ridge,Tennessee 37830 E. 6. DeLaney, DRAP, NE-24 COMPLETION OF DECONTAMINATION OF GILMAN HALL, UNIVERSITY OF CALIFORNIA AT BERKELEY Attached is a copy of the final report covering the remedial actions and associated radiological survey work on Gilman Hall. Your attention is called to the last paragraph of the attached letter from Mr. Davis (SAN) which states: "Completion of this work has fulfilled OR's obligation under the Formerly Utilized Sites Remedial Action Program (FuSRAP). No further involvement by OR/FUSRAP in this matter is required." CE-53:EHH Attachment: As Stated E. L. Keller, Director Technical Services Division _I ." ....I__ - . . _. ._ . ..- - --..-l-.l_ U.S. DEPARTMENT OF ENERGY memmcmhm SET. Francisco Operations Office (ESQA)

467

Calculus of sea-displacement operators  

Science Journals Connector (OSTI)

Sea-displacement operators for fermions are defined in terms of the Fermi fields in a one-component Fermi system. The main conclusions of this article fully corroborate the conjectures made in our earlier works, and provide a mathematically rigorous foundation for these earlier works. These ideas are generalized to electron-hole systems where we are able to clearly explore the nature of exciton-exciton interactions. We find that exciton-exciton interactions in an ideal model of GaAs are not adequately treated simply as of the two-body type; rather the interactions are mediated by the exchange of other bosons that are present in this system. These bosons are identified explicitly and the exciton Green function is calculated. This exercise is also intended to be a precursor to a systematic nonperturbative treatment of gauge theories.

Girish S. Setlur and D. S. Citrin

2002-04-05T23:59:59.000Z

468

Riser and wellhead monitoring for improved offshore drilling operations  

E-Print Network (OSTI)

in mind during riser operations. Safe operation... ...deals with conduction the operation within operation

NÞrvÄg, Kjetil

469

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating  

NLE Websites -- All DOE Office Websites (Extended Search)

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Costs and Societal Environmental Issues Speaker(s): Don Aumann Date: March 21, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Satkartar K. Kinney Don Aumann, a Senior Consultant from BKi in Oakland, will present an overview of two projects he completed for the electric utility industry. The first, a case study evaluation of a hybrid chiller plant in Jefferson City, Missouri, demonstrates the importance of carefully evaluating the impact of utility rate structures on plant operating costs. The building owner, another engineering consultant, and the local utility representatives were confused by the rates and missed an opportunity to cut chiller-plant operating costs by about 20%, totaling $15,000 per year. In

470

Optimisation of operating parameters during the accumulator charging process  

Science Journals Connector (OSTI)

The aim of this work involving the charging process of hydro-pneumatic accumulators in the hydrostatic power transmission system is to propose ''optimal'' operating parameters of the control system, which will allow low petrol consumption, low emission of toxic fumes and verification of the proposed model. As a tool for the simulation work, a simulation application from the Simulink library for a Matlab environment was used. As a result of the research, characteristics of the process quantities, which confirm correctness of the proposed operating parameters of the control system were obtained. In addition, the quantitative and qualitative identification of the presented model was conducted.

Zbigniew Pawelski; Sebastian Wittich

2005-01-01T23:59:59.000Z

471

City of Public Works Comm- Fayetteville, North Carolina (Utility Company) |  

Open Energy Info (EERE)

Works Comm- Fayetteville, North Carolina (Utility Company) Works Comm- Fayetteville, North Carolina (Utility Company) Jump to: navigation, search Name Public Works Comm-City of Fayetteville Place North Carolina Utility Id 6235 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO Other Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 108 Medium Power Service Industrial 108 Medium Power Service Primary Discount Industrial 110 Small Power Service Commercial

472

Auburn Board of Public Works | Open Energy Information  

Open Energy Info (EERE)

Works Works Jump to: navigation, search Name Auburn Board of Public Works Place Nebraska Utility Id 993 Utility Location Yes Ownership M NERC Location MRO NERC SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Demand Service Commercial General Service Single Phase Commercial General Service Three Phase Commercial Irrigation General Service Commercial Large Power Service Commercial Outdoor Lighting Service Lighting

473

Energy At Work: Plant Expansion Creates Job Opportunities in Ohio |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy At Work: Plant Expansion Creates Job Opportunities in Ohio Energy At Work: Plant Expansion Creates Job Opportunities in Ohio Energy At Work: Plant Expansion Creates Job Opportunities in Ohio May 24, 2012 - 5:08pm Addthis Wade Reichelderfer is among the recent hires at DuPont's newly expanded solar manufacturing plant in Circleville, Ohio. | Photo courtesy of DuPont. Wade Reichelderfer is among the recent hires at DuPont's newly expanded solar manufacturing plant in Circleville, Ohio. | Photo courtesy of DuPont. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What does this project do? DuPont's newly expanded solar manufacturing plant in Circleville, Ohio, produces thin film materials to strengthen the durability of solar panels. To support the expansion project, DuPont created 70 new operational

474

Energy At Work: Plant Expansion Creates Job Opportunities in Ohio |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy At Work: Plant Expansion Creates Job Opportunities in Ohio Energy At Work: Plant Expansion Creates Job Opportunities in Ohio Energy At Work: Plant Expansion Creates Job Opportunities in Ohio May 24, 2012 - 5:08pm Addthis Wade Reichelderfer is among the recent hires at DuPont's newly expanded solar manufacturing plant in Circleville, Ohio. | Photo courtesy of DuPont. Wade Reichelderfer is among the recent hires at DuPont's newly expanded solar manufacturing plant in Circleville, Ohio. | Photo courtesy of DuPont. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What does this project do? DuPont's newly expanded solar manufacturing plant in Circleville, Ohio, produces thin film materials to strengthen the durability of solar panels. To support the expansion project, DuPont created 70 new operational

475

State and Tribal Government Working Group Visits the Fernald Preserve |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Fernald Preserve State and Tribal Government Working Group Visits the Fernald Preserve July 12, 2013 - 11:28am Addthis On June 4 and 5, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) hosted the State and Tribal Government Working Group (STGWG) at the Fernald Preserve in Ohio. This group-which receives support from the National Conference of State Legislatures-helps ensure that DOE facilities and sites are operated and cleaned up in compliance with all applicable federal and state laws and regulations and tribal rights. This was the STGWG's third visit to an LM site. In prior years the group visited Weldon Spring, Missouri, and Rocky Flats, Colorado. Members of the State and Tribal Government Working Group hike to the top of the On-Site Disposal Facility for full view of the Fernald Preserve.

476

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

477

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

478

Quality Work Plan Inspection and Monitoring Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

479

Work Force Planning for Public Power Utilities  

E-Print Network (OSTI)

Work Force Planning for Public Power Utilities: Ensuring Resources to Meet Projected Utilities Need to Do More to Prepare for Their Future Work Force Needs.............................................................................20 #12;ii Work Force Planning for Public Power Utilities #12;1 Work Force Planning for Public Power

480

Fuel Cell Technologies Office: Photoelectrochemical Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Fuel Cell Technologies Office: Photoelectrochemical Working Group to someone by E-mail Share Fuel Cell Technologies Office: Photoelectrochemical Working Group on Facebook Tweet about Fuel Cell Technologies Office: Photoelectrochemical Working Group on Twitter Bookmark Fuel Cell Technologies Office: Photoelectrochemical Working Group on Google Bookmark Fuel Cell Technologies Office: Photoelectrochemical Working Group on Delicious Rank Fuel Cell Technologies Office: Photoelectrochemical Working Group on Digg Find More places to share Fuel Cell Technologies Office: Photoelectrochemical Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts

Note: This page contains sample records for the topic "operation 1943-1944 working" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

NREL: Distributed Grid Integration - Working with Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with Us Working with Us NREL's electric infrastructure systems research involves industry, academia, other national laboratories, and various standards organizations through collaborative work and the use of our facilities. Collaborative Work To engage in collaborative work for NREL's distributed energy integration systems, you can: Work with NREL through Cooperative Research and Development Agreements (CRADAs). This is the most widely used means of industrial collaboration. Participate in subcontracted research. More than half of NREL's budget supports DOE-directed research conducted by large and small private companies, universities, research institutes, and consultants. Pay NREL to conduct research independently through Work for Others (WFOs) or Sponsored Research.

482

Guide to Operating and Maintaining EnergySmart Schools  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating Operating and Maintaining EnergySmart Schools ACKNOWLEDGMENTS The U.S. Department of Energy would like to thank the Council of Educational Facility Planners International (CEFPI) for assisting in the development of this guide as a participating sponsor. DOE also acknowledges the invaluable contributions of the working group members and case study subjects listed on the inside back cover. This constructive and informative document would not have been possible without their active engagement. Guide to Operating and Maintaining EnergySmart Schools Table of Contents Executive Summary & Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i Chapter 1. Identifying Energy Savings and Getting Started. . . . . . . . . . . . . . . . .

483

Business Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Operations Business Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of Business Operations - Office of Budget, Office of Business Services, and Office of Information and Business Management - and their managers are outlined in the Business Operations organization chart. Offices Image of the Department of Energy Forrestal building in DC. Office of Budget The Office of Budget provides information that informs policy development and program planning, including basic market and economic data relevant to EERE's programs, market and economic analysis, estimation of the public benefits of EERE's programs, evaluation of past program performance and

484

Independent Activity Report, Hanford Operations Office - July 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, Hanford Operations Office - July 2010 Independent Activity Report, Hanford Operations Office - July 2010 Independent Activity Report, Hanford Operations Office - July 2010 July 2010 Joint Assessment of the Effectiveness of Corrective Actions for the Building 336 Accident The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), and the Richland Operations Office (RL) performed a joint effectiveness assessment of the corrective actions taken by Washington Closure Hanford, LLC (WCH) in response to the Building 336 Fall Event. The review was conducted from July 12-21, 2010, by a team consisting of four HSS and six RL personnel. The scope of the assessment included evaluation of work control, fall protection, quality assurance, and conduct of operations.

485

Elements of an advanced integrated operator control station  

SciTech Connect

One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures.

Clarke, M.M.; Kreifeldt, J.G.

1984-01-01T23:59:59.000Z

486

Elements of an advanced integrated operator control station  

SciTech Connect

One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures.

Clarke, M.M.; Kreifeldt, J.G.

1984-01-01T23:59:59.000Z

487

Lempke receives Sandia Emergency Operations Center tour | National Nuclear  

National Nuclear Security Administration (NNSA)

receives Sandia Emergency Operations Center tour | National Nuclear receives Sandia Emergency Operations Center tour | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Lempke receives Sandia Emergency Operations Center tour Lempke receives Sandia Emergency Operations Center tour Posted By Office of Public Affairs NNSA Blog Brian Bielecki, Director & Facility Security Officer for Security &

488

DOE limited standard: Operations assessments  

SciTech Connect

Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

NONE

1996-05-01T23:59:59.000Z

489

Bohmian Mechanics with Discrete Operators  

E-Print Network (OSTI)

A deterministic Bohmian mechanics for operators with continuous and discrete spectra is presented. Randomness enters only through initial conditions. Operators with discrete spectra are incorporated into Bohmian mechanics by associating with each operator a continuous variable in which a finite range of the continuous variable correspond to the same discrete eigenvalue. In this way Bohmian mechanics can handle the creation and annihilation of particles. Examples are given and generalizations are discussed.

R. A. Hyman; Shane A. Caldwell; Edward Dalton

2004-01-02T23:59:59.000Z

490

Thermodynamic analysis of organic Rankine cycle using dry working fluids  

SciTech Connect

Utilization of waste heat is not economically incentive to the industry once the temperature of the waste heat drops to a certain level. This is primarily due to a low efficiency when converting the energy of the waste heat to some forms of useful power. A Rankine cycle using organic fluids as working fluids, called organic Rankine cycle (ORC), is potentially feasible in recovering low-enthalpy containing heat sources. Nevertheless, an efficient operation of the ORC depends heavily on two factors: working conditions of the cycle and the thermodynamic properties of the working fluids. The main objective of this study is to investigate the effects of these two factors on the performance of the ORC. The working fluids under investigation are: benzene (C{sub 6}H), toluene (C{sub 7}H{sub 8}), p-xylene (C{sub 8}H{sub 10}), R113 and R123. Irreversibility of a system using various working fluids was studied since it represents the energy balance in recovering the waste heat. The study shows that the system efficiency increases as the inlet pressure of the turbine increases regardless of the working fluid used. Among the working fluids under investigation, p-xylene shows the highest efficiency while benzene the lowest. The study also shows that irreversibility depends on the type of heat source. Generally speaking, p-xylene has the lowest irreversibility in recovering a high temperature waste heat while R113 and R123 have a better performance in recovering a low temperature waste heat. In addition, an economic feasibility of ORC using various working fluids is given for ORC`s with commercial capacities.

Wang, S.K.; Hung, T.C. [I-Shou Univ., Tashu (Taiwan, Province of China). Mechanical Engineering Dept.

1998-12-31T23:59:59.000Z

491

AEC and Oak Ridge Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

transitions required was that of moving the center of authority for daily operations from Oak Ridge, splitting the responsibilities and placing segments of control in various other...

492

Variable pressure operation: An assessment  

SciTech Connect

This report summarizes the benefits, drawbacks, and technical issues of variable pressure operation (VPO) retrofit. Under VPO, turbine throttle pressure is reduced at low loads. This operating mode offers several significant advantages for units that cycle or operate at low loads for extended periods. Information used in the report was assembled from published sources, from major equipment manufacturers, and from utilities operating units under VPO in the US, Europe and Japan. The report also contains statistics of VPO use in this country and abroad. Design features of new units using VPO in Europe and Japan are presented to identify potential directions for future US designs incorporating VPO.

Kimel, E.; Kemeny, P.; Bierman, E.; Lagomarsino, J.; Clarke, D. (Burns and Roe, Inc., Oradell, NJ (USA))

1990-03-01T23:59:59.000Z

493

Relational Interpretations of Neighborhood Operators Rough Set Approximation Operators  

E-Print Network (OSTI)

Relational Interpretations of Neighborhood Operators and Rough Set Approximation Operators Y.Y. Yao and rough set approximations using the more familiar notion of binary relations. A special class of neigh sets, partitions, coverings. 1 INTRODUCTION The theory of rough sets is motivated by practical needs

Yao, Yiyu

494

Edinburgh Research Explorer Identity work and face work across linguistic and cultural  

E-Print Network (OSTI)

­54 John E. Joseph Identity work and face work across linguistic and cultural boundaries Abstract:1Edinburgh Research Explorer Identity work and face work across linguistic and cultural boundaries Citation for published version: Joseph, JE 2013, 'Identity work and face work across linguistic

Millar, Andrew J.

495

Working Memory and Schizophrenia 1 Running head: working memory and schizophrenia  

E-Print Network (OSTI)

Working Memory and Schizophrenia 1 Running head: working memory and schizophrenia Working memory.Park@vanderbilt.edu or Junghee.Lee@vanderbilt.edu #12;Working Memory and Schizophrenia 2 Abstract Working memory (WM) deficit and/or early part of maintenance may be problematic. #12;Working Memory and Schizophrenia 3

Park, Sohee

496

Work-Life Balance | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Work-Life Balance Work-Life Balance Balancing work and life means prioritizing what is important to you. Argonne supports employees who want to coordinate work, home and community activities. Lab-provided benefits that help you do that include on-site child care, a credit union, flexible work schedules, generous leave and vacation programs, and much more. A wide variety of social clubs at Argonne promote fellowship and diversity. You can work at Argonne and also have a life of interest and fulfillment. "I have good work-life balance. I spend my workday devoted to my work, and when I go home, I'm able to have a life outside work. I used to play soccer, so I'm looking to join a women's soccer team in the Chicago suburbs." - Emily Wolters, Nuclear Engineer Argonne understands that employment decisions often involve your

497

Final work plan for targeted sampling at Webber, Kansas.  

SciTech Connect

This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

LaFreniere, L. M.; Environmental Science Division

2006-05-01T23:59:59.000Z

498

All Night Study TSU Operations  

E-Print Network (OSTI)

All Night Study TSU Operations Student Engagement Report FY 2012-2013 Mission Statement The purpose. ASI Marketing and ASI Productions conduct promotional activities throughout the program, providing with ASI Marketing and TSU Operations to increase the number of promotional activities and study breaks

de Lijser, Peter

499

Optimization of Wind Turbine Operation  

E-Print Network (OSTI)

inclination angle was about 1°. The spinner anemometer measurements were correlated with wind speed and windOptimization of Wind Turbine Operation by Use of Spinner Anemometer TF Pedersen, NN SÞrensen, L Title: Optimization of Wind Turbine Operation by Use of Spinner Anemometer Department: Wind Energy

500

Operating System Resource Burton Smith  

E-Print Network (OSTI)

Operating System Resource Management Burton Smith Technical Fellow Microsoft Corporation #12;Background · Resource Management (RM) is a primary operating system responsibility ­ It lets competing applications share a system · Client RM in particular faces new challenges ­ Increasing numbers of cores