Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

2

GARS DSOC Closed Action Items -9/19/13 Status Dept.  

NLE Websites -- All DOE Office Websites (Extended Search)

Closed Action Items -9/19/13 Status Closed Action Items -9/19/13 Status Dept. Type of Concern Issue Action Owner Status Originator NE Security/ Operations B. 130 Security violation should a BNL staff member comment on a classified document that has been published in a newspaper, etc. GARS Operational Security Team has made recommendations. New Issues have been added to the list under Security/Operations. GARS OPSEC Team Closed Stand Down NE & NN Security/ Operations * OUO & Proprietary Materials - concern that every is not aware of how to handle OUO & Proprietary material/documents; B815 custodian has master key to all offices - definite risk when OUO & Proprietary Material being used. Also a concern for personal files containing private information. * Classification review/refresher need for people so that

3

GARS DSOC Open Action Items -9/19/13 Status Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Open Action Items -9/19/13 Status Open Action Items -9/19/13 Status Action ID # Dept Type of Concern Issue Action Owner Status Originator Priority 46 DA Security/ Operations The use of Entrust is a vital component of cyber security. The team recommends that a solution to funding the startup and enduring cost be evaluated by the GARS Business office and BNL Cyber Security. Expand and encourage greater usage of Entrust across all categories of sensitive information and employees. 8/6 - Gerry sent a message to T. Schlagel 8/24/12-Testing alt approach. ITD /GARS in communication. 10/5 - G. Stokes to contact T. Schlagel 10/12 - T. Schlagel updated Gerry on progress using Entrust for BNL using the Argonne Solution 10/26 - Solution for system is in process 11/9 - K. McIntyre and K. Gillen on Entrust. Working thru

4

ITEM  

NLE Websites -- All DOE Office Websites (Extended Search)

ITEM ITEM Revised 4/9/2013 APS LOM 438 DESCRIPTION Start Completion Duration Percent Complete 1-Apr 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr 24-Apr 25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 30-Apr 1-May 2-May 3-May 4-May 5-May 6-May 7-May 8-May 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May 29-May 30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul

5

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Alerts SNS Operating Status Alerts Receive updates about the SNS beam status via text messages to your cell phone and/or e-mail by signing up here. The instrument hall coordinators will communicate any significant beam status changes including beam start, beam down, planned and unplanned outages, and unanticipated schedule changes such as delays. On the registration, enter your e-mail address to receive e-mail updates or to receive text messages enter the information below that is specific to your cell phone provider: Carrier Email to SMS Gateway Alltel [10-digit phone number]@message.alltel.com Example:1234567890@message.alltel.com AT&T (formerly Cingular) [10-digit phone number]@txt.att.net [10-digit phone number]@mms.att.net (MMS) [10-digit phone number]@cingularme.com

6

Nova power systems: status and operating experience  

SciTech Connect

This paper describes the pulse power systems that are used in these lasers; the status and the operating experiences. The pulsed power system for the Nova Laser is comprised of several distinct technology areas. The large capacitor banks for driving flashlamps that excite the laser glass is one area, the fast pulsers that drive pockels cell shutters is another area, and the contol system for the pulsed power is a third. This paper discusses the capacitor banks and control systems.

Whitham, K.; Merritt, B.T.; Gritton, D.G.; Smart, A.J.; Holloway, R.W.; Oicles, J.A.

1983-11-28T23:59:59.000Z

7

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

8

Operations Training Program Status Report 1/28/99  

E-Print Network (OSTI)

Operations Training Program Status Report 1/28/99 Michael Spata Operations Deputy Group Leader Following is a description of the various aspects of the Operations Group Training program. While most for providing on-the-job training in accelerator specific topics. The mentor will also be able to certify

9

Field Operations Program Activities Status Report  

SciTech Connect

The Field Operations Program is an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed by the Idaho National Engineering and Environmental Laboratory. The Program's goals are to evaluate electric vehicles in real-world applications and environments, support electric vehicle technology advancement, develop infrastructure elements necessary to support significant electric vehicle use, support increased use of electric vehicles in federal fleets, and increase overall awareness and acceptance of electric vehicles. This report covers Program activities from fiscal year 1997 through mid-fiscal year 1999. The Field Operations Program succeeded the Site Operator Program, which ended in September 1996. Electric vehicle testing conducted by the Program includes baseline performance testing (EV America testing), accelerated reliability (life-cycle) testing, and fleet testing. The baseline performance parameters include accelerations, braking, range, energy efficiency, and charging time. The Program collects accelerated reliability and fleet operations data on electric vehicles operated by the Program's Qualified Vehicle Testing (QVT) partners. The Program's QVT partners have over 3 million miles of electric vehicle operating experience.

J. E. Francfort; D. V. O'Hara; L. A. Slezak

1999-05-01T23:59:59.000Z

10

Geothermal Progress Monitor: system status and operational experience  

SciTech Connect

The Geothermal Progress Monitor (GPM) is an information system designed and implemented by the MITRE Corporation on behalf of the Division of Geothermal and Hydropower Technology (DGHT, formerly Division of Geothermal Energy) of the US Department of Energy (DOE). Its purpose is to keep track of and to report significant events and trends in the US geothermal industry and the federal geothermal program. The information sources of the GPM system are paper and computerized files maintained by a number of organizations throughout the United States. Trade and technical publications are also used to supplement the information-gathering network. Periodic reports from the GPM system consist mainly of manual and computerized analyses of the collected data. In addition, significant events and activities are usually highlighted. The GPM serves a dual function for DGHT and other members of the Interagency Geothermal Coordinating Council (IGCC). It supports effective management of the federal geothermal program and it provides information for executive, legislative, statutory, and public needs. This paper is a report on the current status of the GPM system and a summary of MITRE's operational experience during calendar year 1981 and the first quarter of 1982. It includes a description of the required output and the mechanism by which the information is gathered, integrated, and published as a Geothermal Progress Monitor Report.

Gerstein, R.E.; Kenkeremath, L.D.; Murphy, M.B.; Entingh, D.J.

1982-03-01T23:59:59.000Z

11

Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20  

SciTech Connect

The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1996-06-01T23:59:59.000Z

12

Licensed operating reactors. Status summary report data as of December 31, 1993  

SciTech Connect

The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

Hartfield, R.A.

1994-03-01T23:59:59.000Z

13

Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16  

SciTech Connect

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1992-03-01T23:59:59.000Z

14

Probabilistic analysis and operational data in response to NUREG-0737, Item II. K. 3. 2 for Westinghouse NSSS plants. [Modifications to reduce LOCA due to stuck-open power-operated relief valve  

SciTech Connect

This report describes various modifications to Westinghouse plants since TMI and, using probabilistic analysis via event trees, estimates the effect of the post-TMI changes, including an automatic (PORV) (power operated relief valve) isolation concept identified in NUREG-0731 item II.K.3.1. The requested safety valve operational data is included as an appendix. A significant reduction in the frequency of a small break LOCA, due to a stuck open PORV has already been achieved by the modifications made subsequent to TMI. Domestic Westinghouse operating plant data (based on 181 reactor years of operation) has been collected and evaluated. An auto block valve closure system has been evaluated. The analysis is generally applicable to all Westinghouse plants which have incorporated the post-TMI hardware and procedural changes relative to stuck-open PORVs.

Wood, D.C.; Gottshall, C.L.

1981-02-01T23:59:59.000Z

15

Microsoft Word - config item  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CITSS Configurable Item List CITSS Configurable Item List COTS Software CITSS Configurable Items Page 1 January 1998 CI # CITSS Function Vendor/Version Install Date Location Description/Notes SW-001 Data Base Server Operating System DEC Unix 4.0a 12/05/97 G'tn CA-001 SW-002 Application Server Operating System Novell 3.12 (250 User License) 10/01/97 G'tn C-065A SW-003 Relational Data Base System Oracle 7.3.3 for Unix 4.0a 12/05/97 G'tn CA-001 SW-004 Report Generation Tool Crystal Reports Professional 5.0 10/01/97 QO 370 SW-005 Paging Software WinBeep 2.12 10/01/97 QO 370 SW-006 Help Desk Software Applix Enterprise 6.01 10/01/97 G'tn C-065A SW-007 Web Enabling Software Applix WebLink 1.2.3 12/01/97 QO 370 SW-008 Knowledge Base Software ServiceWare, Inc. Knowledge Paks,

16

Research Items  

Science Journals Connector (OSTI)

... electricity during the past year. He mentions that for many years the installation of transformer substations out-of-doors has been common abroad, and now, owing to the high cost ... high cost of buildings, it is becoming common in Great Britain. Until recently all substations for converting from alternating to direct current were manually operated. Owing mainly to the ...

1927-04-09T23:59:59.000Z

17

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

October 1, 2013 October 1, 2013 Time: 11:00 am Speaker: Mikhail Zamkov, Bowling Green State University Title: Engineering of Semiconductor Nanocrystals & Nanocrystal Solids for Renewable Energy Applications Location: 67-3111 Chemla room Hosted by Delia Milliron: I will discuss a novel methodology for depositing colloidal semiconductor nanocrystals into all-inorganic solid films with implications both to nanocrystal solar cells and nanocrystal light-emitting devices. The reported strategy utilizes a simple scheme for incorporating PbS or CdSe semiconductor nanocrystals into matrices of a wide-band gap CdS semiconductor for stable and efficient operation of solution-processed devices. The two key benefits of this approach include: (i) all-inorganic architecture promoting superior thermal and chemical stability, and - (ii)

18

Binary classification of items of interest in a repeatable process  

DOE Patents (OSTI)

A system includes host and learning machines in electrical communication with sensors positioned with respect to an item of interest, e.g., a weld, and memory. The host executes instructions from memory to predict a binary quality status of the item. The learning machine receives signals from the sensor(s), identifies candidate features, and extracts features from the candidates that are more predictive of the binary quality status relative to other candidate features. The learning machine maps the extracted features to a dimensional space that includes most of the items from a passing binary class and excludes all or most of the items from a failing binary class. The host also compares the received signals for a subsequent item of interest to the dimensional space to thereby predict, in real time, the binary quality status of the subsequent item of interest.

Abell, Jeffrey A.; Spicer, John Patrick; Wincek, Michael Anthony; Wang, Hui; Chakraborty, Debejyo

2014-06-24T23:59:59.000Z

19

Item Subject FAR Case  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Acquisition Circular (FAC) 2005-53 Item Subject FAR Case I. Equal Opportunity for Veterans 2009-007 II. Unique Procurement Instrument Identifier 2009-023 III. Uniform Suspension and Debarment Requirement 2009-036 IV. Extension of Sunset Date for Protests of Task and 2011-015 Delivery Orders V. Encouraging Contractor Policies to Ban Text Messaging 2009-028 While Driving. VI. TINA Interest Calculations 2009-034 Item I--Equal Opportunity for Veterans (FAR 2009-007) The interim rule, published September 29, 2010, is adopted as final with minor changes. A definition from the clause at FAR 52.222-35 for ``executive and senior management'' is added to FAR subpart 22.13. The interim rule implemented Department of

20

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

User_CatalogItemAssign  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assign Items Self-Assign Items © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Self-Assign Items Purpose The purpose of this job aid is to guide users through the step-by-step process of using the catalog to locate and assign items to their To-Do List. Each task demonstrates a different method of searching the catalog. Task A. Locate and Self-Assign Items Using Simple Catalog Search Navigate to the Catalog search box above Easy Links. Enter keywords to search for in the item's title and description. Click the Search icon ( ). 2 1 3 Locate and Self-Assign Items Using Simple Catalog Search - 4 Steps Task A Locate and Self-Assign Items Using Advance Catalog Search - 7 Steps Task B

22

Operational status and life extension plans for the Los Alamos Neutron Science Center (LANSCE)  

SciTech Connect

The Los Alamos Neutron Science Center (LANSCE) accelerator and beam delivery complex generates the proton beams that serve three neutron production sources, a proton radiography facility and a medical and research isotope production facility. The recent operating history of the facility, including both achievements and challenges, will be reviewed. Plans for performance improvement will be discussed, together with the underlying drivers for the ongoing LANSCE Risk Mitigation project. The details of this latter project will also be discussed.

Garnett, Robert W [Los Alamos National Laboratory; Gulley, Mark S [Los Alamos National Laboratory; Jones, Kevin W [Los Alamos National Laboratory; Erickson, John L [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

23

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov

24

Glossary Balancing Item: Represents  

Gasoline and Diesel Fuel Update (EIA)

Balancing Balancing Item: Represents differences between the sum of the components of natural gas supply and the sum of the components of natural gas disposition. These differences may be due to quantities lost or to the effects of data-report- ing problems. Reporting problems include differences due to the net result of conversions of flow data metered at varying temperature and pressure bases and converted to a standard temperature and pressure base; the effect of vari- ations in company accounting and billing practices; differ- ences between billing cycle and calendar period time frames; and imbalances resulting from the merger of data- reporting systems that vary in scope, format, definitions, and type of respondents. Biomass Gas: A medium Btu gas containing methane and carbon dioxide, resulting from the action of microorganisms on organic materials such as a landfill. British Thermal

25

Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009  

SciTech Connect

This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

Howard Forsythe

2010-02-04T23:59:59.000Z

26

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

27

Field Laboratory in the Osage Reservation -- Determination of the Status of Oil and Gas Operations: Task 1. Development of Survey Procedures and Protocols  

SciTech Connect

Procedures and protocols were developed for the determination of the status of oil, gas, and other mineral operations on the Osage Mineral Reservation Estate. The strategy for surveying Osage County, Oklahoma, was developed and then tested in the field. Two Osage Tribal Council members and two Native American college students (who are members of the Osage Tribe) were trained in the field as a test of the procedures and protocols developed in Task 1. Active and inactive surface mining operations, industrial sites, and hydrocarbon-producing fields were located on maps of the county, which was divided into four more or less equal areas for future investigation. Field testing of the procedures, protocols, and training was successful. No significant damage was found at petroleum production operations in a relatively new production operation and in a mature waterflood operation.

Carroll, Herbert B.; Johnson, William I.

1999-04-27T23:59:59.000Z

28

ITEM # 13AA Biomedical Engineering  

E-Print Network (OSTI)

ITEM # 13AA Biomedical Engineering http://ecs.utdallas.edu/BME/ Faculty Professors: John H. L Southwestern and UT Dallas) List joint-assignments here Objectives The Biomedical Engineering Program generation of biomedical engineers will address fundamental scientific questions, provide answers to critical

O'Toole, Alice J.

29

Breakout Items Action Items Fixed Price Contracting Topic Group Summaries  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albuquerque Meeting - July 1997 Albuquerque Meeting - July 1997 Breakout Items Action Items Fixed Price Contracting Topic Group Summaries TOPIC GROUP SUMMARIES Routing * Group reviewed and approved fourth draft of working paper "Routing Issues Related to U.S. Department of Energy Radioactive Materials Transportation: Discussion and Analysis" * Group submitted working paper and draft list of "Stakeholder Recommendations" to TEC/WG and DOE Group reached consensus on three major routing-related issues: * DOE should develop standardized, cooperative approach to route selection * DOE needs to involve all stakeholders * DOE should submit final version of Group's working paper to other federal entities Future topics for consideration: * routing issues relevant to tribal entities and local jurisdictions

30

www.ianrowland.com > Items To Buy > Diana Deutsch CDs Home Items To Buy  

E-Print Network (OSTI)

www.ianrowland.com > Items To Buy > Diana Deutsch CDs Home Items To Buy Items To Buy > Auditory Illusions CDs by Diana Deutsch published by Philomel Records Actual titles: Musical Illusions and Paradoxes

31

Balancing Item (Billion Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Balancing Item (Billion Cubic Feet) Balancing Item (Billion Cubic Feet) Balancing Item (Billion Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 140 143 41 166 30 -13 -8 -6 -26 -133 -76 -161 2002 -4 38 11 164 28 95 54 49 8 -124 -126 -129 2003 -86 76 118 43 30 16 80 57 12 -49 -136 -118 2004 -66 134 126 133 116 71 58 60 63 -13 -79 -142 2005 -41 104 14 131 60 58 62 66 59 -37 -114 -127 2006 49 -2 80 152 53 41 34 51 -2 -99 -101 -153 2007 -128 55 118 42 63 34 3 24 -3 -52 -185 -175 2008 -75 54 59 105 38 42 23 29 16 -51 -106 -132 2009 -21 104 59 52 30 -7 17 -1 -5 -92 -66 -173 2010 -46 9 109 102 19 61 2 16 21 -42 -61 -73 2011 -24 20 -4 17 -7 -11 17 7 36 -61 -32 -51

32

Tevatron status  

SciTech Connect

The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

Dugan, G.

1989-03-01T23:59:59.000Z

33

JOBAID-SELF ASSIGNING COURSES (ITEMS)  

Energy.gov (U.S. Department of Energy (DOE))

In this jobaid you will learn to use the Course Catalog, Browse Catalog, Recommended Items, Locate and Self-Assign Items (Courses) Using the Search Catalog features, Narrow Course Searches using...

34

September 13, 2011, Federal Technical Capability Program Face to Face Meeting … Presentation: FY 2011 Operational Plan Goal Status for Goal 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

f f Functional Area Qualification Standards Enhancements Deborah Monette, Champion Mark Alsdorf, Carol Ingram, Barry Weaver Team Leaders  Status: ◦ Developed FTCP Issue Paper FTCP-10-004  SME definition/process  Evaluate/recommend "expert"-level definition/use  Define and evaluate criteria for provisional qualification  Recommendations:  Recommendations: 1. Accept SME definition/process from FTCP FY09 Operational Plan Goal 3 2. FTCP decision needed on expert-level knowledge definition in FAQSs 1. delete all reference to any competency knowledge level in FAQSs, d l ll f l l k l d 2. delete all reference to expert-level knowledge requirements in FAQSs, 3. retain the FAQS expert-level definition as written, 4. modify the FAQS expert-level definition to read "Expert level is defined as a

35

Item # Item Description Unit Size Supplier # Supplier Name Price Busch Stockroom Product List  

E-Print Network (OSTI)

Item # Item Description Unit Size Supplier # Supplier Name Price Qty On Hand Last Price Update;Item # Item Description Unit Size Supplier # Supplier Name Price Qty On Hand Last Price Update BuschGas 1.00 3,559 03/20/2014 797 Oil Vacuum Pump - 1 Liter S41455 Fisher 9.48 0 03/27/2008 796 Oil Vacuum

Garfunkel, Eric

36

Computer analyses for the design, operation and safety of new isotope production reactors: A technology status review  

SciTech Connect

A review is presented on the currently available technologies for nuclear reactor analyses by computer. The important distinction is made between traditional computer calculation and advanced computer simulation. Simulation needs are defined to support the design, operation, maintenance and safety of isotope production reactors. Existing methods of computer analyses are categorized in accordance with the type of computer involved in their execution: micro, mini, mainframe and supercomputers. Both general and special-purpose computers are discussed. Major computer codes are described, with regard for their use in analyzing isotope production reactors. It has been determined in this review that conventional systems codes (TRAC, RELAP5, RETRAN, etc.) cannot meet four essential conditions for viable reactor simulation: simulation fidelity, on-line interactive operation with convenient graphics, high simulation speed, and at low cost. These conditions can be met by special-purpose computers (such as the AD100 of ADI), which are specifically designed for high-speed simulation of complex systems. The greatest shortcoming of existing systems codes (TRAC, RELAP5) is their mismatch between very high computational efforts and low simulation fidelity. The drift flux formulation (HIPA) is the viable alternative to the complicated two-fluid model. No existing computer code has the capability of accommodating all important processes in the core geometry of isotope production reactors. Experiments are needed (heat transfer measurements) to provide necessary correlations. It is important for the nuclear community, both in government, industry and universities, to begin to take advantage of modern simulation technologies and equipment. 41 refs.

Wulff, W.

1990-01-01T23:59:59.000Z

37

New technologies for item monitoring  

SciTech Connect

This report responds to the Department of Energy`s request that Sandia National Laboratories compare existing technologies against several advanced technologies as they apply to DOE needs to monitor the movement of material, weapons, or personnel for safety and security programs. The authors describe several material control systems, discuss their technologies, suggest possible applications, discuss assets and limitations, and project costs for each system. The following systems are described: WATCH system (Wireless Alarm Transmission of Container Handling); Tag system (an electrostatic proximity sensor); PANTRAK system (Personnel And Material Tracking); VRIS (Vault Remote Inventory System); VSIS (Vault Safety and Inventory System); AIMS (Authenticated Item Monitoring System); EIVS (Experimental Inventory Verification System); Metrox system (canister monitoring system); TCATS (Target Cueing And Tracking System); LGVSS (Light Grid Vault Surveillance System); CSS (Container Safeguards System); SAMMS (Security Alarm and Material Monitoring System); FOIDS (Fiber Optic Intelligence & Detection System); GRADS (Graded Radiation Detection System); and PINPAL (Physical Inventory Pallet).

Abbott, J.A. [EG & G Energy Measurements, Albuquerque, NM (United States); Waddoups, I.G. [Sandia National Labs., Albuquerque, NM (United States)

1993-12-01T23:59:59.000Z

38

WRAP low level waste (LLW) glovebox operational test report  

SciTech Connect

The Low Level Waste (LLW) Process Gloveboxes are designed to: receive a 55 gallon drum in an 85 gallon overpack in the Entry glovebox (GBIOI); and open and sort the waste from the 55 gallon drum, place the waste back into drum and relid in the Sorting glovebox (GB 102). In addition, waste which requires further examination is transferred to the LLW RWM Glovebox via the Drath and Schraeder Bagiess Transfer Port (DO-07-201) or sent to the Sample Transfer Port (STC); crush the drum in the Supercompactor glovebox (GB 104); place the resulting puck (along with other pucks) into another 85 gallon overpack in the Exit glovebox (GB 105). The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved from the entry glovebox to the exit glovebox, the Operator will track an items location using a barcode reader and enter any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolution`s (described below) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation.

Kersten, J.K.

1998-02-19T23:59:59.000Z

39

Process Guide for the Identification and Disposition of S/CI or Defective Items at Department of Energy Facilities  

Energy.gov (U.S. Department of Energy (DOE))

The Process Guide for the Identification and Disposition of S/CI or Defective Items was developed to help DOE facilities to collect, screen, communicate information, and dispose of S/CI or defective items that could potentially impact operations at DOE facilities.

40

UNIT NAME C-611 PCB Spill Site REGULATORY STATUS CERCLA  

NLE Websites -- All DOE Office Websites (Extended Search)

79 UNIT NAME C-611 PCB Spill Site REGULATORY STATUS CERCLA LOCATION C-611 Transformer area (Map location 79) APPROXIMATE DIMENSIONS FUNCTION Spill Site OPERATIONAL STATUS NA DATES...

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

42

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

43

Moral Status  

E-Print Network (OSTI)

Chapters One through Three present the following view: (i) I explain moral status as follows: something has moral status just in case we have reasons not to cause harms to it simply in virtue of the badness of the harms ...

Harman, Elizabeth, 1975-

2003-01-01T23:59:59.000Z

44

Richland Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

treatment and the data should be available by the end of next week. * Status Conduct of Operations There have been several small incidents recently where observations of work...

45

Number Plastic Type Common Items Number of Items (tally) 1 polyethylene terephthalate  

E-Print Network (OSTI)

End Time: Number Plastic Type Common Items Number of Items (tally) 1 polyethylene terephthalate and vegetable oil containers; ovenable food trays. 2 high density polyethylene Milk jugs, juice bottles; bleach, piping, candy wrappers 4 low density polyethylene Squeezable bottles; bread, frozen food, dry cleaning

Schladow, S. Geoffrey

46

Adventures in Poster Making Packet Items  

E-Print Network (OSTI)

Adventures in Poster Making Packet Items Large format posters Changing your poster size Basic Power images Poster organization Stylistic considerations A judges viewpoint Research competitions Recap in Poster Making" workshop that showcases over 50 poster examples. #12;Large Format Posters General Format

47

March 29, 2011, Federal Technical Capabilities Panel Face-to-Face Meeting - FY 2011 Operational Plan Goals Status for Goal 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Functional Area Qualification Standards Enhancements Functional Area Qualification Standards Enhancements Deborah Monette, Champion Status: ◦ Developed Action Plan ◦ Conducted Initial Conference Call Next Steps: Next Steps: ◦ Identify viable qualification paths (4/15) Staged qualification from Entry to Expert ◦ Revise "Expert" definition in FAQS' (4/15) Knowledge and practical experience based ◦ Produce qualification path plan for FTCP Agent ◦ Produce qualification path plan for FTCP Agent comment/approval (7/30) Status: ◦ Action Plan submitted for Panel approval ◦ Brief Panel on Human Factors Engineering (3/29) Next Steps: Next Steps: ◦ Identify competencies and supporting knowledge and skills related to HFE for selected TQP functional areas (5/30) ◦ Panel approve HFE competencies (7/30)

48

The Impact of the Item Types and Number of Solution Steps of Multiple-Choice Items on Item Difficulty and Discrimination and Test Reliability  

E-Print Network (OSTI)

The Impact of the Item Types and Number of Solution Steps of Multiple-Choice Items on Item Difficulty and Discrimination and Test Reliability By Erkan Hasan Atalmis Submitted to the graduate degree program in the Department of Psychology... ________________________________ Bruce Frey ________________________________ Marianne Perie ________________________________ Argun Saatcioglu ________________________________ William Skorupski Date Defended: 5/5/14 The Dissertation Committee for Erkan Hasan...

Atalmis, Erkan Hasan

2014-08-31T23:59:59.000Z

49

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 1. REQUISITION NUMBER SP0600-06-0525 PAGE 1 OF 19 2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER SP0600-06-Q-0408 6. SOLICITATION ISSUE DATE March 8, 2006 7. FOR SOLICITATION INFORMATION CALL: a.NAME Leslie Simpson (703) 767-8536 b. TELEPHONE NUMBER (no collect calls) Phone: See Block 7A Fax: (703) 767-8757 8. OFFER DUE DATE/LOCAL TIME March 15, 2006, 12:00 Noon, Local Time, Fort Belvoir, Virginia 9. ISSUED BY CODE SP0600 10. THIS ACQUISITION IS UNRESTRICTED ⌧ SET ASIDE 100 % FOR

50

Controlled items for SI non-space ITAR in Times Roman  

E-Print Network (OSTI)

waterplane area vessels' having any of the following: i.1. Full load displacement exceeding 500 tonnes Submersible vehicles and surface vessels, as follows (see List of Items Controlled). a. Manned, tethered vehicles having any of the following: b.1. Designed to `operate autonomously' and having a lifting capacity

51

No Evidence for an Item Limit in Change Detection  

E-Print Network (OSTI)

Change detection is a classic paradigm that has been used for decades to argue that working memory can hold no more than a fixed number of items (item-limit models). Recent findings force us to consider the alternative ...

Keshvari, Shaiyan Oliver

52

California Natural Gas Balancing Item (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Balancing Item (Million Cubic Feet) California Natural Gas Balancing Item (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's...

53

SMARTS status  

NLE Websites -- All DOE Office Websites (Extended Search)

SMARTS INSTRUMENT STATUS SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2014/01/11 12:06:58) Run Number: 87401 Title: Sample1 Pretested [4.06,150.00,-0.75,45.00] Run Status: running Last Script Activity: 2014/01/11 11:52:36: Start run 87401; mah 1200000 move 4.06 150.00 -0.75 45.00 View full script Next Script Command: mah 1200000 move -0.75 120.00 -0.60 45.00 Proposal#: 4808 Sample#: 977 MAH: 837309 Monitor: 306052 Beam Current: 100 Shutter Status: OPEN Used disk space on /home: 52% Used disk space on /disk2: 74% Crate Status smartsdaq1 smartsdaq2 smartsdaq3 smartsdaq4 smartsdaq5 T0's in Run 16946 16959 16971 16984 16997 T0's Processed 16946 16959 16971 16984 16997 Events 726326 649097 794699 702610 3750460 Events/T0 42.86 38.27 46.83 41.37 220.65

54

Guide to good practices for the development of test items  

SciTech Connect

While the methodology used in developing test items can vary significantly, to ensure quality examinations, test items should be developed systematically. Test design and development is discussed in the DOE Guide to Good Practices for Design, Development, and Implementation of Examinations. This guide is intended to be a supplement by providing more detailed guidance on the development of specific test items. This guide addresses the development of written examination test items primarily. However, many of the concepts also apply to oral examinations, both in the classroom and on the job. This guide is intended to be used as guidance for the classroom and laboratory instructor or curriculum developer responsible for the construction of individual test items. This document focuses on written test items, but includes information relative to open-reference (open book) examination test items, as well. These test items have been categorized as short-answer, multiple-choice, or essay. Each test item format is described, examples are provided, and a procedure for development is included. The appendices provide examples for writing test items, a test item development form, and examples of various test item formats.

NONE

1997-01-01T23:59:59.000Z

55

NNSA Defense Programs collects nearly 20 large boxes of items for Toys for  

National Nuclear Security Administration (NNSA)

collects nearly 20 large boxes of items for Toys for collects nearly 20 large boxes of items for Toys for Tots | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA Defense Programs collects nearly 20 large ... NNSA Defense Programs collects nearly 20 large boxes of items for Toys for Tots Posted By Office of Public Affairs

56

Sitewide Categorical Exclusion for Removal of Polychlorinated Biphenyl-Containing Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 SWCX for Removal of PCB-Containing Items Revision 0 17 SWCX for Removal of PCB-Containing Items Revision 0 Sitewide Categorical Exclusion for Removal of Polychlorinated Biphenyl-Containing Items Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office Integrated An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the san1e or lesser scope) ofDOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide categorical exclusions for use on proposed actions in which separate DOE approval to proceed is

57

Measuring student learning with item response theory  

E-Print Network (OSTI)

measured in this way will enable the use of IRT to assess students based on their second attempt in a tutoring environment. DOI: 10.1103/PhysRevSTPER.4.010102 PACS number#1;s#2;: 01.40.Fk, 01.40.G#1;, 01.50.ht INTRODUCTION This work stands... first deter- mine the skill of students and the difficulty of items based PHYSICAL REVIEW SPECIAL TOPICS - PHYSICS EDUCATION RESEARCH 4, 010102 #1;2008#2; 1554-9178/2008/4#1;1#2;/010102#1;6#2; 2008 The American Physical Society010102-1 solely...

Lee, Young-Jin; Palazzo, David J.; Warnakulasooriya, Rasil; Pritchard, David E.

2008-01-01T23:59:59.000Z

58

Automation Status  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

59

UNIT NAME -C-340 PCB Spill Site REGULATORY STATUS CERCLA LOCATION  

NLE Websites -- All DOE Office Websites (Extended Search)

NAME -C-340 PCB Spill Site REGULATORY STATUS CERCLA LOCATION C-340 Transformer area (Map locat1on 74 )- APPROXIMATE DIMENSIDNS Unnown - FUNCTION Scill site- OPERATIONAL STATUS NA...

60

Examining NAEP: The Effect of Item Format on Struggling 4th Graders' Reading Comprehension  

E-Print Network (OSTI)

items I Item Format MC SCR ECR X X X X X X X X X X X X X X XFormat difficulty: MCSCRSCR=11 items, ECR=32 items).

Griffo, Vicki

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

July 24, 2006, Department letter providing status and path forward for the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

July 24, 2006 July 24, 2006 The Honorable A. J. Eggenberger Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, DC 20004-294 1 Dear Mr. Chairman: In June 2005, I provided you with a copy of the Department's revised Implementation Plan to Improve Oversight of Nuclear Operations in response to Board recommendation 2004- 1 . Since that time, the Department has completed numerous planned actions and has learned from this experience how best to sustain real improvement in this area. Based on the feedback to date, we are preparing to make a course correction on our implementation plan to improve its effectiveness and to bolster line management accountability. To this end, we plan to revise our 2004-1 implementation plan and provide you with this revision by

62

Safety Evaluation for Packaging (onsite) T Plant Canyon Items  

SciTech Connect

This safety evaluation for packaging (SEP) evaluates and documents the ability to safely ship mostly unique inventories of miscellaneous T Plant canyon waste items (T-P Items) encountered during the canyon deck clean off campaign. In addition, this SEP addresses contaminated items and material that may be shipped in a strong tight package (STP). The shipments meet the criteria for onsite shipments as specified by Fluor Hanford in HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments.

OBRIEN, J.H.

2000-07-14T23:59:59.000Z

63

3-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS  

E-Print Network (OSTI)

3-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS Brookhaven National Laboratory Department of Environmental Conservation. Ten reportable spills of petroleum products occurred on site items. 2001 SITE ENVIRONMENTAL REPORT Compliance Status B R O O K H A V E N N A T I O N A L L A B O R

Homes, Christopher C.

64

CRAD, Suspect/Counterfeit Item | Department of Energy  

Office of Environmental Management (EM)

Item More Documents & Publications Independent Oversight Special Study, Department of Energy - August 2003 Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART...

65

A User's Guide To BRILLIANT! TEST SCORING AND ITEM ANALYSIS  

E-Print Network (OSTI)

A User's Guide To BRILLIANT! TEST SCORING AND ITEM ANALYSIS August, 2008 Program Brilliant!: Test ....................................................................................................2 Test Scoring Enhancements.............................................................................................................................................................2 Scoring different test forms

66

Current Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Status Current Status > Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player July 31, 1942 The Army Corp of Engineers leases 1,025 acres of the Cook County Forest Preserve to build a research facility. November 1942 Under the direction of Enrico Fermi, a group of scientists at the University of Chicago begin building Chicago Pile-1 (CP-1). Security and secracy were essential. December 2, 1942 Enrico Fermi's team creates the world's first self-sustaining nuclear chain reaction using the CP-1 reactor under Stagg Field at the University of Chicago. CP-1 1943 The experiments under Stagg Field shut down, and the scientists move to a 19 acre section of the leased forest preserve, known as Site A. CP-1 is reconstructed and modified at Site A and renamed Chicago Pile 2 (CP-2).

67

ESnet Planning, Status,  

NLE Websites -- All DOE Office Websites (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

68

Items Prohibited for Purchase January 2012  

E-Print Network (OSTI)

Cell phones/Cell phone accessories Charter (Aircraft, Boats, Buses) Coleman Cable Polar/Solar Plus electronics fasteners metal plastics pressure vessels Fall Protection Equipment from any manufacturer rings, pear shaped links Hooks Manual, electric & air- operated hoist Manually operated lever hoist

Pennycook, Steve

69

The greening of the U.S. Department of Energy Headquarters, Washington, D.C. Second-year status report  

SciTech Connect

The Greening of the Department of Energy Headquarters is a comprehensive, multi-year project designed to identify and implement specific actions DOE can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It is part of the Administration`s overall effort to promote greening in all of the nation`s federal buildings. Present Clinton started the Greening of the White House in 1993, and similar efforts have been undertaken by the Department of Defense at the Pentagon, the National Park Service at the Presidio, and now the Department of Energy at the Forrestal and Germantown buildings. The Greening of the Department of Energy Headquarters, An Action Plan for Success (Action Plan), unveiled on April 22, 1996, outlined more than 80 action items for DOE`s Forrestal and Germantown buildings. The action items were designed to increase energy efficiency, improve resource management, improve air quality, reduce water use, reduce paper use, improve landscape management, improve maintenance and operational procedures, increase employee participation, and promote education and outreach. In the two years since the Action Plan was introduced, the Department of Energy has made major progress in implementing specific action items designed to target four major subject areas: (1) Energy Efficiency; (2) Resource Management; (3) Air, Water, Landscape, and (4) Human Factors. This report outlines the status of the recommendations of the Action Plan since they were introduced two years ago.

NONE

1998-04-22T23:59:59.000Z

70

Toolbox Safety Talk Forklift Operator Safety  

E-Print Network (OSTI)

, cart or hand truck instead of lifting and carrying items by hand can reduce the risk of employee back Forklift Inspection Checklist as needed. · Inspect operation of brakes, hydraulic controls, lights, back up

Pawlowski, Wojtek

71

Federal Acquisition Circular 2005-39 Item I--Extend Use of Simplified Acquisition Procedures for Certain Commercial Items (FAR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 Item I--Extend Use of Simplified Acquisition Procedures for Certain Commercial Items (FAR Case 2009-035) This final rule amends the FAR to implement section 81 6 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 201 0. The rule extends for two more years the commercial items test program in FAR subpart 13.5. The program was to expire January 1, 2010. Item 11--Clarification of Submission of Cost or Pricing Data on Non-Commercial Modifications of Commercial Items (FAR Case 2008-0 12) This final rule adopts, with minor changes, the interim rule published in the Federal Register at 74 FR 1 1826 on March 19,2009. The interim rule amended the FAR to implement section 8 14 of the NDAA for FY 2008. Section 8 14 requires the harmonization of the threshold for cost

72

CPP Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Program (CPP) Protection Program (CPP) Status FY10 Jeff Mauth Project Manager May 19, 2010 1 Agenda  Sensor Integration  Sensor Deployment  CPP Portal  Mercury  Parting Comments  Questions 2 Sensor Integration Task Lead: Greg Thomas  Flo and Flower: Session Data  Snort: Network Intrusion Detection Data  AMP: Various Types of Network Data  PopQuiz: Various Types of Network Data  T3: Data Movement and Sensor Control 3 Sensor Deployment Task Lead: Liz Faultersack Certification and Accreditation Continued Expansion Hardware Refresh to Begin FY11 9 CPP Portal Task lead: Brett Didier Features Sharing Policy Data and Releases 13 CPP Portal Provides DOE cyber analysts access to CPP collected "DOE enterprise" data

73

RIA Overview and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Science Office of Science U.S. Department of Energy Guy Savard Argonne National Laboratory & University of Chicago Based on Material presented at the ATLAS Operation's Review December 8-10, 2003 by The Californium Source Upgrade 2 Pioneering Science and Technology Office of Science U.S. Department of Energy 12/8-10/2003 ATLAS Upgrade Guy Savard ATLAS Status * ATLAS only low-energy accelerator for stable ions operating as a User Facility with well documented characteristics (reliability, beam quality, transmission, timing,...) * Excellent and varied physics program with a large User community * What lies ahead for ATLAS * Maintain position as premier low-energy heavy ion accelerator * Address open physics/technical questions leading to RIA * Help the community in the "pre-RIA"

74

Instruction Guide Saving and Retrieving Items from My Favorites  

E-Print Network (OSTI)

. For further assistance, e-mail myufmarket@ufl.edu or contact Purchasing Services Help Desk at 392 to find items to add to the Favorites page, we will utilize the product search tool. 2. Click the add

Pilyugin, Sergei S.

75

http://edocsrpts.doe.gov:80/edocsreports/SingleItem.rpt | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt More...

76

ASSESSMENT OF THE IPR ALGORITHM FOR THE DIFFERENTIAL FUNCTIONING OF ITEMS AND TESTS FRAMEWORK.  

E-Print Network (OSTI)

??The Diferential Functioning of Items and Tests (DFIT) framework is a widely used test of di erential functioning. DFIT uses the Item Parameter Replication (IPR) (more)

NEUHENGEN, JONAS M.

2014-01-01T23:59:59.000Z

77

Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers  

SciTech Connect

Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantly cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator/procurements specialist.

Tessmar, Nancy D. [Los Alamos National Laboratory; Salazar, Michael J. [Los Alamos National Laboratory

2012-09-18T23:59:59.000Z

78

Item Subject I. Preventing Abuse of Interagency Contracts.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(FAC) 2005-55 (FAC) 2005-55 List of Rules in FAC 2005-55 Item Subject I. Preventing Abuse of Interagency Contracts. II. Transition to the System for Award Management (SAM). III. Brand-Name Specifications. IV. Time-and-Materials and Labor-Hour Contracts for Commercial Items. V. Public Access to the Federal Awardee Performance and Integrity Information System. VI. Updated Financial Accounting Standards Board Accounting References. VII. Technical Amendments. Item I--Preventing Abuse of Interagency Contracts (FAR Case 2008-032) This rule adopts as final, with changes, an interim rule that implemented section 865, Preventing Abuse of Interagency Contracts, of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 (Pub. L. 110-417). This final rule further amends FAR

79

1.1_Item_11_RITT_07_Jun_1900_NL.pdf | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Item11RITT07Jun1900NL.pdf 1.1Item11RITT07Jun1900NL.pdf 1.1Item11RITT07Jun1900NL.pdf More Documents & Publications 2.1Item5BOPDwg07Jun1800NL.pdf...

80

Diffusion-Confusion based Light-weight Security for Item-RFID Tag-Reader Communication  

E-Print Network (OSTI)

privacy while carrying tagged items. Keywords: RFID, Tag-Reader communication security, Light item recall etc. As a result, very soon we can expect to see RFID tagged consumer items at manyDiffusion-Confusion based Light-weight Security for Item-RFID Tag-Reader Communication DIVYAN M

Kim, Kwangjo

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Method of data mining including determining multidimensional coordinates of each item using a predetermined scalar similarity value for each item pair  

DOE Patents (OSTI)

A method of data mining represents related items in a multidimensional space. Distance between items in the multidimensional space corresponds to the extent of relationship between the items. The user can select portions of the space to perceive. The user also can interact with and control the communication of the space, focusing attention on aspects of the space of most interest. The multidimensional spatial representation allows more ready comprehension of the structure of the relationships among the items.

Meyers, Charles E. (Albuquerque, NM); Davidson, George S. (Albuquerque, NM); Johnson, David K. (Albuquerque, NM); Hendrickson, Bruce A. (Albuquerque, NM); Wylie, Brian N. (Albuquerque, NM)

1999-01-01T23:59:59.000Z

82

Assessing Invariance of Factor Structures and Polytomous Item Response Model Parameter Estimates  

E-Print Network (OSTI)

.e., identical items, different people) for the homogenous graded response model (Samejima, 1969) and the partial credit model (Masters, 1982)? To evaluate measurement invariance using IRT methods, the item discrimination and item difficulty parameters... obtained from the GRM need to be equivalent across datasets. The YFCY02 and YFCY03 GRM item discrimination parameters (slope) correlation was 0.828. The YFCY02 and YFCY03 GRM item difficulty parameters (location) correlation was 0...

Reyes, Jennifer McGee

2012-02-14T23:59:59.000Z

83

Microsoft Word - BSA NC Items Rev11.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

NCItems, Rev. 11; (Jun-12) 1 of 21 NCItems, Rev. 11; (Jun-12) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NONCOMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 3 Article 2 ORDER OF PRECEDENCE ............................................................................................. 3 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 4

84

Seasonality in the Natural Gas Balancing Item: Historical Trends and  

Gasoline and Diesel Fuel Update (EIA)

Analysis > Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Analysis > Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Released: June 4, 2010 Download Full Report (PDF) This special report examines an underlying cause of the seasonal pattern in the balancing item published in the Natural Gas Monthly. Research finds that a significant portion of data collected on EIA’s primary monthly natural gas consumption survey reflects billing data that does not strictly coincide with the actual calendar month, which creates an aggregate-level discrepancy with EIA’s other natural gas supply and disposition data series. This discrepancy is especially observable during the fall and spring as one transitions into and out of the winter heating season. The report also outlines improved data collection and estimation procedures that will be implemented later this year to more closely align reported and actual calendar month consumption. This discussion will be helpful to users of EIA’s volumetric natural gas data. Questions about this report should be directed to Andy Hoegh at andrew.hoegh@eia.doe.gov or (202) 586-9502.

85

List of OTC Products (Items subject to change without notice)  

E-Print Network (OSTI)

List of OTC Products (Items subject to change without notice) Allergy/Cough/Cold/Flu Symptoms * Requires Valid ID for purchase/18 yo Cough Drops Cherry 30ct Cold Eeze tablets 18ct Allergy Tablets 24ct Loratidine D* 10ct Comtrex Cold and Cough* Daytime* Softgels 12 & 20ct Nighttime* Softgels 12ct Banophen Tabs

Stuart, Steven J.

86

Field Operations Program  

NLE Websites -- All DOE Office Websites (Extended Search)

688 688 May 1999 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort D. V. O'Hara L. A. Slezak DOE/ID-10688 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort 1 D. V. O'Hara 2 L. A. Slezak 2 Published May 1999 Idaho National Engineering and Environmental Laboratory Automotive Systems and Technology Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Idaho Operations Office 1 INEEL/Lockheed Martin Idaho Technologies Co. 2 U.S. Department of Energy iii EXECUTIVE SUMMARY The Field Operations Program is an electric vehicle testing and evaluation program sponsored by U.S. Department of Energy and managed by the Idaho National Engineering and Environmental

87

VPP Participant Status  

Energy.gov (U.S. Department of Energy (DOE))

The VPP Participant Status document lists all the DOE VPP participants and their current status within the VPP Program. Additionally, participant information includes governing program office and estimated number of employees for each participant.

88

Comparison of Bottom-Up and Top-Down Forecasts: Vision Industry Energy Forecasts with ITEMS and NEMS  

E-Print Network (OSTI)

of the Department of Energy's Office of Industrial Technologies, EIA extracted energy use infonnation from the Annual Energy Outlook (AEO) - 2000 (8) for each of the seven # The Pacific Northwest National Laboratory is operated by Battelle Memorial Institute...-6, 2000 NEMS The NEMS industrial module is the official forecasting model for EIA and thus the Department of Energy. For this reason, the energy prices and output forecasts used to drive the ITEMS model were taken from EIA's AEO 2000. Understanding...

Roop, J. M.; Dahowski, R. T

89

Operating Experience Level 1, 2, and 3 Documents | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE complex (or affected sites) of potentially significant safety issues (e.g., Conduct of Operations or SuspectCounterfeit or Defective Items). The OE-2 document includes a...

90

Heuristic status polling  

DOE Patents (OSTI)

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

91

SUMMARY OF FINAL RULES Item Subject FAR Case  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIRCULARS 2005-56 and -57 CIRCULARS 2005-56 and -57 SUMMARY OF FINAL RULES Item Subject FAR Case FAC 56-Miscellaneous I. Women-Owned Small Business Program 2010-015 II. Proper Use and Management of Cost-Reimbursement Contracts 2008-030 III. Requirements for Acquisitions Pursuant to Multiple-Award Contracts 2007-012 IV. Socioeconomic Program Parity 2011-004 V. Trade Agreements Thresholds 2012-002 VI. New Designated Country (Armenia) and Other Trade Agreements Updates 2011-30 VII. Government Property 2010-009 VIII. Technical Amendments FAC 57- Korea Free trade Agreement Item I-Women-Owned Small Business (WOSB) Program (FAR Case 2010-015) This rule adopts as final, with changes, an interim rule published in the Federal Register at 76 FR

92

Microsoft Word - BSA NC Items Rev10.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

10; (Aug. 2011) 1 of 17 10; (Aug. 2011) 1 of 17 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NON-COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Definitions 2 Article 1 Order of Precedence 2 Article 2 Acceptance of Agreement 2 Article 3 Complete Agreement 3 Article 4 Assignment 3 Article 5 Compliance with Laws and Regulations 3 Article 6 Compliance with Internet Protocol Version 6 (IPv6) In Acquiring Information Article 7 Technology. 3 Independent Contractor; Hold Harmless 4 Article 8 Notice Regarding Late Delivery 4 Article 9 Inspection and Acceptance 4 Article 10 No Waiver 5 Article 11 New Materials 5 Article 12 Suspect/Counterfeit Items 5 Article 13 Hazardous Material Identification and Material Safety Data 6 Article 14 Title and Risk of Loss 6 Article 15

93

Federal Acquisition Circular 2005-52 Item Subject FAR case  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Circular 2005-52 Circular 2005-52 Item Subject FAR case I Sustainable Acquisition 2010-001 II Contract Closeout 2008-020 III Prohibition on Contracting with Inverted Domestic Corporations 2008-009 IV Buy American Exemption for Commercial Information Technology - Construction Material 2009-039 V Oversight of Contractor Ethics Programs 2010-017 VI Technical Amendments N/A Item I--Sustainable Acquisition (FAR Case 2010-001) (Interim) This interim rule amends the FAR to implement Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management. It requires Federal agencies to leverage agency acquisitions to foster markets for

94

Lab Status via Twitter | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab Status via Twitter Lab Status via Twitter Employees can be notified of changes to the laboratory's operations - for example, a delayed opening due to a heavy overnight snowfall - via the "Argonnestatus" account on Twitter. The account can be set to automatically send text messages to most mobile phones and PDAs. In addition to a short description of any changes in laboratory operations, messages may contain links to additional, detailed information. Only messages about changes in laboratory business hours will be sent. Most mobile communication devices can receive Twitter updates; instructions for receiving Argonne Status updates by phone are below. Any applicable text messaging charges from your provider are your responsibility. The Twitter Web site has basic information about the free online service.

95

Implementation Plan for Tank Farm Transition Projects Suspect and Counterfeit Items  

SciTech Connect

This plan is designed to provide an appropriate level of confidence that Tank Farm Transition Projects (TFTP) facilities will be evaluated to assess the presence of suspect/counterfeit items. It is intended to identify suspect/counterfeit items that are presently in inventory and provide for the reporting and disposition of those items. Items which have been installed will also receive appropriate evaluation using a graded approach to achieve optimum results balanced against safety considerations and cost effectiveness.

TRUE, R.R.

2000-03-16T23:59:59.000Z

96

BCDA Machine Status Link  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine Status Link Machine Status Link Version 1.33 (December 2005) David M. Kline. The Machine Status Link (MSL) is responsible for distributing the digitized beam current, injection status, P0 clock, and other statuses over a single fiber to several locations around the Storage Ring. The MRD100 is a VME-based module that is part of the MSL and was specifically designed for the APS. It receives and interprets information from the XMS100 module by means of copper or fiber. Signals from the XMS100 module are sent at a P0 rate (3.667 microseconds). It sends two registers every cycle and all in about 12 cycles. Refer to the ASD website for additional information regarding the MSL. The focus of this page is to provide information of how to configure the MRD100 for a beamline IOC and to discuss the sample IOC

97

H.A.R. 11-265 - Hazardous Management: Interim Status Standard...  

Open Energy Info (EERE)

Status Standard for Owners and OperatorsLegal Abstract The Hawaii State Department of Health regulates hazardous waste management through this chapter of the administrative rules....

98

UNIT N~E C-S31 Sw1tchvard REGULA-TORY STATUS CERCLA  

NLE Websites -- All DOE Office Websites (Extended Search)

STATUS Av I DATES OPERATED 1951 to oresent SITEPROCESS DESCRIPTION: Power transformer and switchyard. solvents were used to clean transformer external surfaces. WASTE...

99

Nuclear proliferation status report. Status report  

SciTech Connect

This report contains information concerning the nuclear proliferation status of the following countries: (1) Russia, (2) Ukraine, (3) Belarus, (4) Kazakhstan, (5) Israel, (6) India, (7) Pakistan, (8) South Africa, (9) North Korea, (10) Iraq, (11) Iran, (12) Lybia, (13) Algeria, (14) Syria, (15) Brazil, (16) Argentina, and (17) Taiwan.

NONE

1992-07-01T23:59:59.000Z

100

2010 Annual Planning Summary for Savannah River Operations Office...  

Energy Savers (EERE)

Savannah River Operations Office (SRS) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12...

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Oil shale: Technology status report  

SciTech Connect

This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

Not Available

1986-10-01T23:59:59.000Z

102

Apparatus and method for identification and recognition of an item with ultrasonic patterns from item subsurface micro-features  

DOE Patents (OSTI)

The present invention is a means and method for identification and recognition of an item by ultrasonic imaging of material microfeatures and/or macrofeatures within the bulk volume of a material. The invention is based upon ultrasonic interrogation and imaging of material microfeatures within the body of material by accepting only reflected ultrasonic energy from a preselected plane or volume within the material. An initial interrogation produces an identification reference. Subsequent new scans are statistically compared to the identification reference for making a match/non-match decision.

Perkins, Richard W. (Richland, WA); Fuller, James L. (Richland, WA); Doctor, Steven R. (Richland, WA); Good, Morris S. (Richland, WA); Heasler, Patrick G. (Richland, WA); Skorpik, James R. (Kennewick, WA); Hansen, Norman H. (Kennewick, WA)

1995-01-01T23:59:59.000Z

103

Apparatus and method for identification and recognition of an item with ultrasonic patterns from item subsurface micro-features  

DOE Patents (OSTI)

The present invention is a means and method for identification and recognition of an item by ultrasonic imaging of material microfeatures and/or macrofeatures within the bulk volume of a material. The invention is based upon ultrasonic interrogation and imaging of material microfeatures within the body of material by accepting only reflected ultrasonic energy from a preselected plane or volume within the material. An initial interrogation produces an identification reference. Subsequent new scans are statistically compared to the identification reference for making a match/non-match decision. 15 figs.

Perkins, R.W.; Fuller, J.L.; Doctor, S.R.; Good, M.S.; Heasler, P.G.; Skorpik, J.R.; Hansen, N.H.

1995-09-26T23:59:59.000Z

104

STANDARD OPERATING PROCEDURE DIMETHYL SULFOXIDE (DMSO)  

E-Print Network (OSTI)

be handled as hazardous waste. 8. Decontamination: Specific instructions: Wash items/surfaces with light12.1 STANDARD OPERATING PROCEDURE for DIMETHYL SULFOXIDE (DMSO) Location(s): ___________________________________________________ Chemical(s): Dimethyl Sulfoxide (DMSO) Specific Hazards: Combustible liquid, transport across skin barrier

Pawlowski, Wojtek

105

STANDARD OPERATING PROCEDURE Location(s): ___________________________________________________  

E-Print Network (OSTI)

of as hazardous waste. 8. Decontamination: Specific instructions: For light contamination of small areas or items12.1 STANDARD OPERATING PROCEDURE for PHENOL Location(s): ___________________________________________________ Chemical(s): Phenol Specific Hazards: May be fatal if inhaled. Harmful if absorbed through skin. Harmful

Pawlowski, Wojtek

106

Operations Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards BPA Operations Information (OPI) Transmission Services operates and plans for regional and national system needs. Transmission Services coordinates system operation and...

107

What is the status of the Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

status of the Project? status of the Project? The first phase of the project was energized on July 20, 2006. It operated flawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offline after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's first use of 2G in any utility device. Phase II of the project was energized on January 8, 2008.

108

REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

184 UNIT NAME: Concrete Rubble pile 129) REGULATORY STATUS: AOC LOCATION: Outside plant security south of C-611 Water Treatment Plant. Estimated to be less than 5 cubic feet....

109

Status of Solar Photovoltaics  

Science Journals Connector (OSTI)

Before our discussions on the technical aspects of solar photovoltaics, we will first review the status of solar photovoltaics. This chapter begins with a review on ... known barrier to large-scale deployment of ...

Meng Tao

2014-01-01T23:59:59.000Z

110

Special Study of The Department of Energy's Management of Suspect/Counterfeit Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SPECIAL STUDY SPECIAL STUDY Independent Oversight Special Study of The Department of Energy's Management of Suspect/Counterfeit Items August 2003 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ............................................................... 1 1.0 INTRODUCTION ...................................................................... 3 2.0 DOE HEADQUARTERS SUSPECT/COUNTERFEIT ITEM PROCESSES .................................................................... 6 3.0 IMPLEMENTATION OF SUSPECT/COUNTERFEIT ITEM REQUIREMENTS AT DOE SITES ................................. 13 4.0 CONCLUSIONS AND RECOMMENDATIONS ....................... 24 APPENDIX A - Supplemental Information ....................................... 30 Abbreviations Used in This Report CY Calendar Year DCIS Defense Criminal Investigative Service

111

E-Print Network 3.0 - assessment item format Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

NJ... at 50 ms( s) Loss concentrated at midplane v Action Items Calculate power density of prompt loss Source: Fusiongnition Research Experiment (FIRE) Collection: Plasma...

112

NQA-1 Requirements for Commercial Grade Item Acceptance: ICONE20-54738  

SciTech Connect

Objectives are: (1) Present the DOE Chemistry and Metallurgy Research Replacement (CMRR) Project Commercial Grade Item (CGI) Dedication Process; and (2) Present CMRR Project CGI Lessons-Learned.

Van Valkenburg, Taunia S. [Los Alamos National Laboratory; Holmes, Richard A. [Los Alamos National Laboratory; Tepley, Daniel J. [Los Alamos National Laboratory; Sandquist, Gary [APPLIED SCIENCE PROFESSIONALS

2012-07-19T23:59:59.000Z

113

MIP-based heuristics for multi-item capacitated lot-sizing problem ...  

E-Print Network (OSTI)

it : safety stock deficit unit cost for item i at period t. .... A second step consists then in shifting forward the decision window while keeping an overlapping.

2005-09-30T23:59:59.000Z

114

Talk about pictures and objects The Role of Representational Status and Item Complexity in Parent-Child Conversations  

E-Print Network (OSTI)

Carpenter, Bethany Gorka, Kate Kozeliski, Brook McCloud, Rob Palazzo, Keli Rulf, Jenna Salm, and Colleen

Reber, Paul J.

115

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

116

Doubles counting of highly multiplying items in reflective surroundings  

SciTech Connect

When a neutrons are counted from a spontaneously fissile multiplying item in a reflecting environment the temporal behavior of the correlated signal following neutron birth is complex. At early times the signal is dominated by prompt fission events coming from spontaneous fission bursts and also from prompt fast-neutron induced fission events. At later times neutrons 'returning' from the surroundings induce fission and give rise to an additional chain of correlated events. The prompt and returning components probe the fissile and fertile constituents of the item in different ways and it is potentially beneficial to exploit this fact. In this work we look at how the two components can be represented using a linear combination of two simple functions. Fitting of the composite function to the capture time distribution represents one way of quantifying the proportion of each contribution. Another approach however is to use a dual shift register analysis where after each triggering event two coincidence gates are opened, one close to the trigger that responds preferentially to the prompt dynamics and one later in time which is more sensitive to the returning neutron induced events. To decide on the best gate positions and gate widths and also to estimate the counting precision we can use the analytical fit to work out the necessary gate utilization factors which are required in both these calculations. In this work, we develop the approach. Illustrative examples are given using spent Low Enriched Uranium (LEU) Pressurized light Water Reactor (LWR) fuel assemblies submersed in borated water and counted in a ring of {sup 3}He gas-filled proportional counters. In this case the prompt component is dominated by {sup 244}Cm spontaneous fission and induced fast neutron fission in for example {sup 238}U while the returning low energy neutrons induce fission mainly in the fissile nuclides such as {sup 239}Pu, {sup 241}Pu and {sup 235}U. One requirement is to calculate the Random Triggered Interrogation Gate Utilization Factor needed to make a priori precision estimates but not available from Monte Carlo simulation code MCNPX.

Croft, Stephen [Los Alamos National Laboratory; Evans, Louise G [Los Alamos National Laboratory; Schear, Melissa A [Los Alamos National Laboratory; Tobin, Stephen J [Los Alamos National Laboratory

2010-11-18T23:59:59.000Z

117

Status report: The Groningen AMS facility  

Science Journals Connector (OSTI)

The Groningen AMS facility has been in operation since 1994. The AMS is based on a 2.5 MV tandetron accelerator. It is an automatic mass spectrometer, dedicated to 14C analysis. Thus far, a grand total of about 16000 14C targets have been measured. We report here on the status and performance of the facility, technical improvements and a precision study on atmospheric samples.

J van der Plicht; S Wijma; A.T Aerts; M.H Pertuisot; H.A.J Meijer

2000-01-01T23:59:59.000Z

118

Heliostat History and Status  

Science Journals Connector (OSTI)

This paper describes the evolution of the SSPS heliostat field subsystem during three years of operation....

Pierre Wattiez; Juan Ramos

1986-01-01T23:59:59.000Z

119

Operating Experience Level 3, Dangers of Objects Falling into Normally Occupied Areas  

Energy.gov (U.S. Department of Energy (DOE))

This Operating Experience Level 3 (OE-3) document provides information about a safety concern related to the dangers of items falling from heights into spaces normally occupied by workers at Department of Energy (DOE) facilities.

120

Impact of forecasting error on the performance of capacitated multi-item production systems  

E-Print Network (OSTI)

Impact of forecasting error on the performance of capacitated multi-item production systems Jinxing multi-item production system under demand uncertainty and a rolling time horizon. The output from parameters, thus improving the performance of production systems. q 2004 Elsevier Ltd. All rights reserved

Xie, Jinxing

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Exploring the extension of item response theory models to the economic and social measurement  

Science Journals Connector (OSTI)

This paper has a methodological focus and is aimed at exploring the advantages of using the Item Response Theory (IRT) models in the measurement of financial strain. Basically, the IRT models allow deriving a latent measure and a scale from a set of ... Keywords: item response theory, multivariate probit regression, parameters

Raileanu Szeles Monica

2008-07-01T23:59:59.000Z

122

Item memory, source memory, and the medial temporal lobe: Concordant findings from fMRI  

E-Print Network (OSTI)

Item memory, source memory, and the medial temporal lobe: Concordant findings from fMRI and memory Lake City, UT 84143 Contributed by Larry R. Squire, April 4, 2006 We studied item and source memory with fMRI in healthy volun- teers and carried out a parallel study in memory-impaired patients

Wagner, Anthony

123

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

124

Automation Status | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. mfg2011plenarysperrick.pdf More...

125

Current status of Japanese detectors  

E-Print Network (OSTI)

Current status of TAMA and CLIO detectors in Japan is reported in this article. These two interferometric gravitational-wave detectors are being developed for the large cryogenic gravitational wave telescope (LCGT) which is a future plan for detecting gravitational wave signals at least once per year. TAMA300 is being upgraded to improve the sensitivity in low frequency region after the last observation experiment in 2004. To reduce the seismic noises, we are installing new seismic isolation system, which is called TAMA Seismic Attenuation System, for the four test masses. We confirmed stable mass locks of a cavity and improvements of length and angular fluctuations by using two SASs. We are currently optimizing the performance of the third and fourth SASs. We continue TAMA300 operation and R&D studies for LCGT. Next data taking in the summer of 2007 is planned. CLIO is a 100-m baseline length prototype detector for LCGT to investigate interferometer performance in cryogenic condition. The key features of CLIO are that it locates Kamioka underground site for low seismic noise level, and adopts cryogenic Sapphire mirrors for low thermal noise level. The first operation of the cryogenic interferometer was successfully demonstrated in February of 2006. Current sensitivity at room temperature is close to the target sensitivity within a factor of 4. Several observation experiments at room temperature have been done. Once the displacement noise reaches at thermal noise level of room temperature, its improvement by cooling test mass mirrors should be demonstrated.

Daisuke Tatsumi; Ryutaro Takahashi; Koji Arai; Noriyasu Nakagawa; Kazuhiro Agatsuma; Toshitaka Yamazaki; Mitsuhiro Fukushima; Masa-Katsu Fujimoto; Akiteru Takamori; Alessandro Bertolini; Virginio Sannibale; Riccardo DeSalvo; Szabolcs Marka; Masaki Ando; Kimio Tsubono; Tomomi Akutsu; Kazuhiro Yamamoto; Hideki Ishitsuka; Takashi Uchiyama; Shinji Miyoki; Masatake Ohashi; Kazuaki Kuroda; Norichika Awaya; Nobuyuki Kanda; Akito Araya; Souichi Telada; Takayuki Tomaru; Tomiyoshi Haruyama; Akira Yamamoto; Nobuaki Sato; Toshitaka Suzuki; Takakazu Shintomi

2007-04-22T23:59:59.000Z

126

Status of the WIPP Project  

SciTech Connect

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would be wiser to take the actions necessary to decide whether the facility should be used as a permanent repository, before emplacing a substantial quantity of waste in it. This report evaluates the status of the WIPP Project as of February 1991. 22 refs.

Neill, R.H.; Chaturvedi, L.

1991-01-01T23:59:59.000Z

127

Nuclear reactor characteristics and operational history  

Gasoline and Diesel Fuel Update (EIA)

Nuclear > U.S. reactor operation status tables Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: November 2012 See also: Table 1. Capacity and Generation, Table 2. Ownership Data Table 3. Nuclear Reactor Characteristics and Operational History PDF XLS Plant Name Generator ID Type Reactor Supplier and Model Construction Start Grid Connection Original Expiration Date License Renewal Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1 PWR Babcock&Wilcox, Lower Loop 10/1/1968 8/17/1974 5/20/2014 2/1/2000 6/20/2001 5/20/2034 Arkansas Nuclear One 2 PWR Combustion Eng. 7/1/1971 12/26/1978 7/17/2018 10/15/2003 6/30/2005 7/17/2038

128

Nuclear reactor characteristics and operational history  

U.S. Energy Information Administration (EIA) Indexed Site

Nuclear > U.S. reactor operation status tables Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: November 2012 See also: Table 2. Ownership Data, Table 3. Characteristics and Operational History Table 1. Nuclear Reactor, State, Type, Net Capacity, Generation, and Capacity Factor PDF XLS Plant/Reactor Name Generator ID State Type 2009 Summer Capacity Net MW(e)1 2010 Annual Generation Net MWh2 Capacity Factor Percent3 Arkansas Nuclear One 1 AR PWR 842 6,607,090 90 Arkansas Nuclear One 2 AR PWR 993 8,415,588 97 Beaver Valley 1 PA PWR 892 7,119,413 91 Beaver Valley 2 PA PWR 885 7,874,151 102 Braidwood Generation Station 1 IL PWR 1,178 9,196,689 89

129

National Synchrotron Light Source guidelines for the conduct of operations  

SciTech Connect

This report briefly discusses the following topics: NSLS operations organization and administration; shift routines and operating practices; NSLS control room activities; communications; control of on-shift training; investigation of abnormal events; notifications; control of equipment and system status; lock-out tagout; independent verification; logkeeping; shift turnover; required reading; shift orders; equipment operations guides; operator aid postings; and equipment labeling.

Fewell, N.

1990-03-01T23:59:59.000Z

130

Westinghouse conduct of operations manual as a tool  

SciTech Connect

This presentation discusses the Westinghouse Government-Owned and Contractor-Operated (GOCO) Conduct of Operations Manual and how it compares with US Department of Energy (DOE) Order 5480.19 and with the Price Anderson Safety Guide, 10 CFR 830.310. This presentation will focus on what has been added to the requirements of the DOE order and how these items can be used as tools to create excellence in operation.

Schilperoort, D.L.; Scanlan, P.R.

1992-04-01T23:59:59.000Z

131

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

Petrolem Reports Petrolem Reports Weekly Petroleum Status Report Data for week ending Dec. 13, 2013 | Release Date: Dec. 18, 2013 | Next Release Date: Dec. 27, 2013 | full report Previous Issues Week: December 18, 2013 December 11, 2013 December 4, 2013 November 27, 2013 November 20, 2013 November 14, 2013 November 6, 2013 October 30, 2013 October 23, 2013 October 21, 2013 October 9, 2013 October 2, 2013 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30 a.m. 1:00 p.m. Highlights Weekly Petroleum Status Report Highlights PDF PDF Data Overview (Combined Table 1 and Table 9) PDF Tables 1 U.S. Petroleum Balance Sheet CSV XLS PDF 2 U.S. Inputs and Production by PAD District CSV XLS PDF

132

Small Business Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact of Teaming Arrangements on Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following provision in solicitations where it expects teaming or joint ventures to propose. GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL BUSINESS STATUS (a) This procurement has been set aside for small business. In order to ensure that award

133

Hopper Updates and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled maintenance tomorrow (Sept 19) and /project outage 18 September 2012, 4:46 pm Please use "gres" settings in your batch scripts 4 September 2012, 2:03 pm high thruput queue now available on Hopper 30 August 2012, 4:27 pm max walltime for low queue is increased to 24 hrs on Hopper

136

Application for Research Affiliate Associate & Student Status...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Affiliate Program Application for Research Affiliate Associate & Student Status Application for Research Affiliate Associate & Student Status The following application...

137

National Hydrogen Learning Demonstration Status | Department...  

Energy Savers (EERE)

Hydrogen Learning Demonstration Status National Hydrogen Learning Demonstration Status Download presentation slides from the Fuel Cell Technologies Program webinar "National...

138

Status of JUPITER Program  

SciTech Connect

To obtain the data necessary for evaluating the nuclear design method of a large-scale fast breeder reactor, criticality tests with a large- scale homogeneous reactor were conducted as part of a joint research program by Japan and the U.S. Analyses of the tests are underway in both countries. The purpose of this paper is to describe the status of this project.

Inoue, T.; Shirakata, K.; Kinjo, K.; Ikegami, T.; Yamamoto, M.

1981-03-10T23:59:59.000Z

139

MARS Flight Engineering Status  

SciTech Connect

The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

Fast, James E.; Dorow, Kevin E.; Morris, Scott J.; Thompson, Robert C.; Willett, Jesse A.

2010-04-06T23:59:59.000Z

140

Nevada Operations Office  

Office of Legacy Management (LM)

Nevada Operations Office Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified as the location of the subject liquid wastes. Numerous readings were made with a hand-held Ludlum Model 125 Micro-R meter, for the purpose of personnel radiation protection walking into the controlled, posted radioactive waste compounds. No readings were above background.

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Salt repository project closeout status report  

SciTech Connect

This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

NONE

1988-06-01T23:59:59.000Z

142

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

143

Polar Maps at the William C. Wonders Map Collection, University of Alberta Display items -PLC June 2008  

E-Print Network (OSTI)

Polar Maps at the William C. Wonders Map Collection, University of Alberta Display items - PLC June, University of Alberta Display items - PLC June 2008 C:\\Documents and Settings items - PLC June 2008 C:\\Documents and Settings\\mclarke\\Desktop\\PolarLibraries.doc10/3/2008 3 7 Title

MacMillan, Andrew

144

Greener Commercial A/C Units Becoming a Cool Item | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item July 1, 2010 - 5:11pm Addthis Greener Commercial A/C Units Becoming a Cool Item Stephen Graff Former Writer & editor for Energy Empowers, EERE A new federal tax credit is helping McQuay International expand its line of energy-efficient HVAC products at two of its plants and bring back furloughed workers. With the help of a 48C manufacturing tax credit worth $2 million under the American Recovery and Reinvestment Act, McQuay's Minnesota and Virginia plants have been or will be upgraded and expanded to produce new lines of energy efficient products. The tax credit is playing a role, but offering a bigger-and more efficient-selection of HVAC products also came down to basic economics:

145

Preparation for Scientists Sailing on the JOIDES Resolution Items strictly prohibited on the ship  

E-Print Network (OSTI)

, chocolate, snacks Soft drinks, coffee, Lipton black/green tea Good coffee and herbal tea GENERAL INFORMATION follow on the next page. Some items, such as coffee, tea, snacks, and toiletries may be purchased

146

ITEM RESPONSE THEORY SCALING OF AN ACADEMIC MEDICAL CENTER STUDENT SATISFACTION SURVEY  

E-Print Network (OSTI)

Item response theory scaling has been well established in achievement testing, but the practice has seen limited use in student development research. The purpose of this study was to explore the reliability and validity ...

Meiers, Christopher Stephen

2010-05-06T23:59:59.000Z

147

The role of fluency in a mathematics item with an embedded graphic: interpreting a pie chart  

Science Journals Connector (OSTI)

The purpose of this study was to identify the pedagogical knowledge relevant to the successful completion of a pie chart item. This purpose was achieved through ... olds required for the successful solution of a

Carmel Mary Diezmann; Tom Lowrie

2009-10-01T23:59:59.000Z

148

Tracking and fleet optimization of Reusable Transport Items in the shipping industry  

E-Print Network (OSTI)

This thesis explores the strategies, methodologies and tools for an optimal management of Reusable Transport Items, such as containers or chassis, in an extensive multi-depots network. We use an ocean shipping company ...

Lefebvre, Jean-Marie, M. Eng. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

149

Monte Carlo techniques of simulation applied to a single item inventory system  

E-Print Network (OSTI)

MONTE CARI, O TECHNIQUES OF SIMULATION APPLIED TO A SINGLE ITEM INVENTORY SYSTEM A Thesis By WILLIAM MURRAY ALDRED, JR. Submitted to the Graduate College of the Texas A&M University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE August 1965 Major SubJect: Computer Science MONTE CARLO TECHNIQUES OF SIMULATION APPLIED TO A SINGLE ITEM INVENTORY SYSTEM A Thesis By WILLIAM MURRAY ALDRED, JR. Approved as to style and content by: (Chairman of Committee (Head...

Aldred, William Murray

2012-06-07T23:59:59.000Z

150

PFP Public Automatic Exchange (PAX) Commercial Grade Item (CGI) Critical Characteristics  

SciTech Connect

This document specifies the critical characteristics for Commercial Grade Items (CGI) procured for use within the safety envelope of PFP's PAX system as required by HNF-PRO-268 and HNF-PRO-1819. These are the minimum specifications that the equipment must meet in order to properly perform its safety function. There may be several manufacturers or models that meet the critical characteristics for any one item.

WHITE, W.F.

2000-04-04T23:59:59.000Z

151

Differential item functioning in the Peabody Picture Vocabulary Test - Third Edition: partial correlation versus expert judgment  

E-Print Network (OSTI)

and content by: Cecil R. Reynolds (Chair of Committee) Maricela Oliva (Member) Cynthia A. Riccio (Member) Victor L. Willson (Head of Department) Salvador Hector Ochoa (Member) December 2003 Major Subject: School Psychology... Committee: Dr. Cecil R. Reynolds This study had three purposes: (1) to identify differential item functioning (DIF) on the PPVT-III (Forms A & B) using a partial correlation method, (2) to find a consistent pattern in items identified...

Conoley, Colleen Adele

2004-09-30T23:59:59.000Z

152

Distributed Generation Status Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 DOE Peer Review Presentation 0 DOE Peer Review Presentation © Chevron 2010 CERTS Microgrid Demonstration with Large scale Energy Storage & Renewable Generation November 5, 2010 Presented By: Craig Gee, Project Manager (for Mr. Eduardo Alegria - Principal Investigator) Energy Solutions November 2010 DOE Peer Review Presentation © Chevron 2010 Agenda * Introduction - Who we are * Project Team & Site * Project Purpose & Objectives * Project Impacts * System Elements * Project Status * Research Elements * Recent Developments in California * Questions & Comments November 2010 DOE Peer Review Presentation © Chevron 2010 Chevron Energy Solutions Designed & Implemented over 900 Projects in the U.S.  Chevron ES, a division of Chevron USA, Inc. is committed to delivering economically & environmentally advantageous green

153

CHEF: a status report  

SciTech Connect

CHEF refers both to a framework and to an interactive application emphasizing accelerator optics calculations. The framework supports multiple domains of applications: e.g. nonlinear analysis, perturbation theory, and tracking. Its underlying philosophy is to provide an infrastructure with minimum hidden implicit assumptions, general enough to facilitate both routine and specialized computational tasks, and to minimize the duplication of necessary, complex bookkeeping tasks. CHEF was already described in recent conferences. This paper is a status report on recent developments, including issues related to applications to high energy linacs.

Ostiguy, J.-F.; Michelotti, L.; /Fermilab

2007-06-01T23:59:59.000Z

154

Status of Climate Change  

E-Print Network (OSTI)

Status of Climate Change 2013 CaTee Conference San Antonio 2013 ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Menu for Today IPCC 2013: Assessment Report #5 Facts about Climate Change... Who will Win, Who will Lose What Needs to be Done ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 IPCC #5 No great surprises - Sharper language Uncertainties are still large Essentially...

North, G.

2013-01-01T23:59:59.000Z

155

Model Validation Status Review  

SciTech Connect

The primary objective for the Model Validation Status Review was to perform a one-time evaluation of model validation associated with the analysis/model reports (AMRs) containing model input to total-system performance assessment (TSPA) for the Yucca Mountain site recommendation (SR). This review was performed in response to Corrective Action Request BSC-01-C-01 (Clark 2001, Krisha 2001) pursuant to Quality Assurance review findings of an adverse trend in model validation deficiency. The review findings in this report provide the following information which defines the extent of model validation deficiency and the corrective action needed: (1) AMRs that contain or support models are identified, and conversely, for each model the supporting documentation is identified. (2) The use for each model is determined based on whether the output is used directly for TSPA-SR, or for screening (exclusion) of features, events, and processes (FEPs), and the nature of the model output. (3) Two approaches are used to evaluate the extent to which the validation for each model is compliant with AP-3.10Q (Analyses and Models). The approaches differ in regard to whether model validation is achieved within individual AMRs as originally intended, or whether model validation could be readily achieved by incorporating information from other sources. (4) Recommendations are presented for changes to the AMRs, and additional model development activities or data collection, that will remedy model validation review findings, in support of licensing activities. The Model Validation Status Review emphasized those AMRs that support TSPA-SR (CRWMS M&O 2000bl and 2000bm). A series of workshops and teleconferences was held to discuss and integrate the review findings. The review encompassed 125 AMRs (Table 1) plus certain other supporting documents and data needed to assess model validity. The AMRs were grouped in 21 model areas representing the modeling of processes affecting the natural and engineered barriers, plus the TSPA model itself Description of the model areas is provided in Section 3, and the documents reviewed are described in Section 4. The responsible manager for the Model Validation Status Review was the Chief Science Officer (CSO) for Bechtel-SAIC Co. (BSC). The team lead was assigned by the CSO. A total of 32 technical specialists were engaged to evaluate model validation status in the 21 model areas. The technical specialists were generally independent of the work reviewed, meeting technical qualifications as discussed in Section 5.

E.L. Hardin

2001-11-28T23:59:59.000Z

156

SPEAR Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Interface 1113 N. Kurita J. Langton Vacuum TSP's 1120 J. Corbett A. Terebilo MATLAB Applications - Basics 1121 F. Rafael Booster Kicker Upgrade, Operation Manual 1121...

157

operations center  

National Nuclear Security Administration (NNSA)

1%2A en Operations Center http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismoperationscenter

...

158

Redelegation Order No. 00-002.04-01 to the Chief Operating Officer...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assistant Secretary for Fossil Energy Delegate: Chief Operating Officer Office of Fossil Energy Status: Current Effective Date: May 02, 2011 Re-delegation Allowed: Yes...

159

Knob manager (KM) operators guide  

SciTech Connect

KM, Knob Manager, is a tool which enables the user to use the SUNDIALS knob box to adjust the settings of the control system. The followings are some features of KM: dynamic knob assignments with the user friendly interface; user-defined gain for individual knob; graphical displays for operating range and status of each process variable is assigned; backup and restore one or multiple process variable; save current settings to a file and recall the settings from that file in future.

NONE

1993-10-08T23:59:59.000Z

160

Status of the SLC damping rings  

SciTech Connect

Electron beams of full design energy 1.21 GeV and nearly full design intensity 4 x 10/sup 10/ particles/pulse (design 5 x 10/sup 10/) have been extracted from the Stanford Linac and successfully stored in the electron damping ring. Beams of less intensity have been extracted from the ring and reinjected into the Linac. The present intensity limits are not thought to be fundamental. The operating experience with the electron ring and the status of the construction of the positron ring will be discussed. 11 refs., 1 fig., 2 tabs.

Hutton, A.M.; Davies-White, W.A.; Delahaye, J.P.; Fieguth, T.H.; Hofmann, A.; Jager, J.; Kloeppel, P.K.; Lee, M.J.; Linebarger, W.A.; Rivkin, L.

1985-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

UCPath Project Status Report Report Date August 23, 2013  

E-Print Network (OSTI)

unfilled critical positions. Development of UCPath Center operating procedures. UCPath project health check1 UCPath Project Status Report Report Date August 23, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Tony Lo has resigned as Project Director

Russell, Lynn

162

California's Renewables Portfolio Standard (RPS) List of Facilities Certification Status  

E-Print Network (OSTI)

California's Renewables Portfolio Standard (RPS) List of Facilities Certification Status Terms Facility State Facility County Commercial Operations Date Nameplate Capacity Technology Eligibility Date-Certification High Desert Solar One - HDSO Victorville CA San Bernardino 1/1/2007 101 Solar Thermal Electric 8

163

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

v v U.S. crude oil refinery inputs averaged 16.0 million barrels per day during the week ending December 13, 2013, 200 thousand barrels per day lower than the previous week's average. Refineries operated at 91.5% of their operable capacity last week. Gasoline production increased last week, averaging 9.3 million barrels per day. Distillate fuel production decreased last week, averaging 5.0 million barrels per day.

164

UNIT NUMBER C-7S0A Gasoline UST UNIT NAME REGULATORY STATUS:...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 UNIT NUMBER C-7S0A Gasoline UST UNIT NAME REGULATORY STATUS: AOC LOCATION: Southeast corner C-750 APPROXIMATE DIMENSIONS: 10,000 gallon FUNCTION: Gasoline storage OPERATIONAL...

165

Fuel Cell Development Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Development Status Michael Short Systems Engineering Manager United Technologies Corporation Research Center Hamilton Sundstrand UTC Power UTC Fire & Security Fortune 50 corporation $52.9B in annual sales in 2009 ~60% of Sales are in building technologies Transportation Stationary Fuel Cells Space & Defense * Fuel cell technology leader since 1958 * ~ 550 employees * 768+ Active U.S. patents, more than 300 additional U.S. patents pending * Global leader in efficient, reliable, and sustainable fuel cell solutions UTC Power About Us PureCell ® Model 400 Solution Process Overview Power Conditioner Converts DC power to high-quality AC power 3 Fuel Cell Stack Generates DC power from hydrogen and air 2 Fuel Processor Converts natural gas fuel to hydrogen

166

DFC Technology Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Pinakin Patel Pinakin Patel Mohammad Farooque FuelCell Energy, Inc. 3 Great Pasture Road Danbury, Ct 06813 DFC Technology Status * Distributed generation puts power where it's needed * Increases power reliability * Near zero emissions allow units to be sited almost anywhere - even polluted urban areas * Reduces need for central generation plants * Reduces grid congestion and need for new transmission lines * Distributed generation enables smart grid * Balances the grid with 24/7 power * Meets requirements for low carbon technology * Smaller projects enable faster permitting, financing, and execution DFC power plant is an enabler for broad distributed generation 600 kW at M&L Commodities Distributed Generation FuelCell Energy Products Fuel Cell Stack DFC300 Single Module

167

PROVOST CHALLENGE OVERVIEW STATUS REPORT  

E-Print Network (OSTI)

PROVOST CHALLENGE OVERVIEW STATUS REPORT December 2013 # Project Status Project Name · Project Lead report) Joyce O'Halloran and Rachel Webb, The Fariborz Maseeh Department of Mathematics and Statistics 54 ON SCHEDULE Online Academic Advising & Career Development Modules. (Link to detailed report) Mary Ann Barham

Lafferriere, Gerardo

168

Design operators  

E-Print Network (OSTI)

Design operators is a thesis that investigates the nature and characteristics of the design process by examining the interaction of computation with architectural design. The effects of the introduction of these media in ...

Dritsas, Stylianos, 1978-

2004-01-01T23:59:59.000Z

169

Business Operations  

Office of Energy Efficiency and Renewable Energy (EERE)

The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of...

170

Operating Costs  

Directives, Delegations, and Requirements

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

171

ARM - Value-Added Products - Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Process Status Software Status Status Updated On Notes Released Version SGP C1 Green led Running Green led Released 2012-08-06 SGP.C1 (Lamont, OK) 1997-2009 v2.0:...

172

Machine Status | Argonne Leadership Computing Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

User Support User Support Machine Status Presentations Training & Outreach User Survey Machine Status Science on Mira Cores Core Hours Catalyst 65536 114771.01226563 Large scale...

173

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

174

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

175

Wanted dead or alive? Western genre items in the 21st century United States library  

Science Journals Connector (OSTI)

The Western genre, that is frontier adventure stories set west of the Mississippi River, has been enjoying a resurgence in popularity, yet there has been no substantive look at the collection of Western genre novels and films in libraries. The online catalogs of 100 libraries across the United States were examined, and a follow-up questionnaire was sent, to determine the scope of Western genre item holdings and the institutional attitudes towards this genre. This study found that Western genre items are still well represented in most collections. However, it also revealed weaknesses in the way genre collection development is conducted.

Robert Perret

2012-01-01T23:59:59.000Z

176

ANAIS: Status and prospects  

E-Print Network (OSTI)

ANAIS experiment will look for dark matter annual modulation with large mass of ultra-pure NaI(Tl) scintillators at the Canfranc Underground Laboratory (LSC), aiming to confirm the DAMA/LIBRA positive signal in a model-independent way. Two 12.5 kg each NaI(Tl) crystals provided by Alpha Spectra are currently taking data at the LSC. Present status of ANAIS detectors background and general performance is summarized; in particular, thanks to the high light collection efficiency prospects of lowering the threshold down to 1 keVee are reachable. Crystal radiopurity goals are fulfilled for $^{232}$Th and $^{238}$U chains and $^{40}$K activity, although higher than original goal, could be accepted; however, high $^{210}$Pb contamination out-of-equilibrium has been identified. More radiopure detectors are being built by Alpha Spectra. The ongoing high quantum efficiency PMT tests and muon veto characterization are also presented. Finally, the sensitivity of the experiment for the annual modulation in the WIMP signal,...

Amar, Julio; Cuesta, Clara; Garca, Eduardo; Ginestra, Carlos; Martnez, Mara; Olivn, Miguel A; Ortigoza, Ysrael; de Solrzano, Alfonso Ortz; Pobes, Carlos; Puimedn, Jorge; Sarsa, Mara Luisa; Villar, Jos ngel; Villar, Patricia

2015-01-01T23:59:59.000Z

177

Substation Operation  

Science Journals Connector (OSTI)

... THIS book is intended to help the workman to understand the principles of substation operation. It is a good attempt at giving somewhat advanced technical knowledge in such ... ." We are told not to use water to put out a fire at a substation before the station has been made completely " dead." The reason given for this ...

1925-08-01T23:59:59.000Z

178

Joint Meeting on Hydrogen Delivery Modeling and Analysis, May 8-9, 2007, Discussion Session Highlights, Comments, and Action Items  

Energy.gov (U.S. Department of Energy (DOE))

This summary highlights the disussion session, comments, and action items from the Joint Meeting on Hydrogen Delivery Modeling and Analysis, May 8-9, 2007.

179

Guide to good practices for control of equipment and system status  

SciTech Connect

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Control of Equipment and System Status, Chapter VIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing equipment and system status control programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Control of Equipment and System Status is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the need for a formal status control program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

180

Status of Oregon's Bull Trout.  

SciTech Connect

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Status Report, Essential System Functionality - January 2006 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Report on Essential System Functionality In 2004 and 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, performed ten evaluations of essential system functionality (ESF). These ESF reviews are highly technical, detailed engineering evaluations of selected essential systems within one or more facilities at each site. This report summarizes the observations and insights from these reviews. Although most essential safety systems that were reviewed were well maintained, tested, and operated, there were significant weaknesses in some aspects of engineering design and analysis that, for some safety systems,

182

Status of Direct Heat Application Projects | Open Energy Information  

Open Energy Info (EERE)

Heat Application Projects Heat Application Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Status of Direct Heat Application Projects Abstract In order to promote the use of hydrothermal energy for direct heat applications, the U.S. Department of Energy (DOE) has funded twenty-two demonstration projects. Eight of these projects are administered by the San Francisco Operation Office of the Department of Energy (DOE-SAN) with technical support form the Energy Technology Engineering Center (ETEC) of Rockwell International. The projects are described and their status given. Author Kendal S. Robinson Published Journal Geothermal Resources Council Transactions, 1981 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Status of Direct Heat Application Projects

183

Microsoft Word - BSA_NonCommercial_Items_Rev13_Apr_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3; (Apr-13) 1 of 21 3; (Apr-13) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NONCOMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 3 Article 2 ORDER OF PRECEDENCE ............................................................................................. 3 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 4 Article 4 COMPLETE AGREEMENT ............................................................................................. 4 Article 5 RESPECTFUL WORKPLACE POLICY .......................................................................... 4

184

DOE Hosts Festival to Collect Items for Area Food Banks | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Festival to Collect Items for Area Food Banks Festival to Collect Items for Area Food Banks DOE Hosts Festival to Collect Items for Area Food Banks July 1, 2012 - 12:00pm Addthis The DOE Feeds Families Fest and Hunger Awareness Event are from 11 a.m. to 2 p.m. at the Forrestal West Plaza in Washington, D.C. The DOE Feeds Families Fest and Hunger Awareness Event are from 11 a.m. to 2 p.m. at the Forrestal West Plaza in Washington, D.C. WASHINGTON, D.C. - Deputy Secretary of Energy Daniel Poneman and a representative of the Capital Area Food Bank are among the guest speakers at an event this Tuesday, July 31, to collect food items for the DOE Feeds Families drive. The DOE Feeds Families Fest and Hunger Awareness Event are from 11 a.m. to 2 p.m. at the Forrestal West Plaza in Washington, D.C. The fest features an

185

Microsoft Word - BSA_NonCommercial_Items_Rev12_Jan_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

2; (Jan-13) 1 of 21 2; (Jan-13) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NONCOMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 3 Article 2 ORDER OF PRECEDENCE ............................................................................................. 3 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 4 Article 4 COMPLETE AGREEMENT ............................................................................................. 4 Article 5 RESPECTFUL WORKPLACE POLICY .......................................................................... 4

186

Microsoft Word - BSA_Commercial_Items_Rev12_Jan_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Comm, Rev. 12; (Jan-13) 1 of 12 Comm, Rev. 12; (Jan-13) 1 of 12 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 2 Article 2 ORDER OF PRECEDENCE ............................................................................................. 2 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 3 Article 4 COMPLETE AGREEMENT ............................................................................................. 3 Article 5 RESPECTFUL WORKPLACE POLICY .......................................................................... 3

187

HOUSE ENERGY AND WATER DEVELOPMENT SUBCOMMITTEE ACTION on FY 2009 Budget for fusion related items  

E-Print Network (OSTI)

the domestic fusion energy sciences program. Given the tremendous potential of fusion energy to provide a longHOUSE ENERGY AND WATER DEVELOPMENT SUBCOMMITTEE ACTION on FY 2009 Budget for fusion related items of a Continuing Resolution this year. ____________________________ "FUSION ENERGY SCIENCES The Committee

188

Where can I recycle it year-round? Item Local Recycling Locations  

E-Print Network (OSTI)

Where can I recycle it year-round? Item Local Recycling Locations Styrofoam First Alternative Co-op Recycling Center, 1007 SE 3rd St., 541-753-3115 (small fee) Packing Peanuts OSU Surplus, 644 SW 13 th St., 541-737-7347 Commercial shipping stores Film Plastics First Alternative Co-op Recycling Center, 1007

Escher, Christine

189

Shipping / mailing items 1. What is it? letter or reagents or equipment or documents?  

E-Print Network (OSTI)

Shipping / mailing items 1. What is it? letter or reagents or equipment or documents? 2. Is receipt date important? If receipt date is important and you need a tracking number, you should use receiving.) will give you a tracking number. As of 2011, we are using FedEx for most standard shipments. See sample

Koehler, Carla

190

PPPL PRINCETON PLASMA PHYSICS LABORATORY TERMS & CONDITIONS FOR COMMERCIAL ITEMS OR SERVICES  

E-Print Network (OSTI)

) "Agreement" means Purchase Order, Subcontract, Price Agreement, Basic Ordering Agreement, or any mod by Princeton for DOE under Prime Contract No. DE-AC02-09CH11466. (f) "Princeton" means the Trustees orders and agreements for commer- cial items or services awarded by Princeton University Plasma Physics

191

Operations Jim Irby MIT-PSFC DoE  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations Jim Irby MIT-PSFC DoE Quarterly 4/28/2005 Outline * Machine status and run statistics * Cryopump Development * Status of other projects * Short term plans DoE Quarterly 4/28/2005 Machine Status and Run Statistics History * C-Mod resumed plasma operation on Feb 4 th 2005 * Number of discharges so far this campaign: 684 * Startup reliability including plasma conditioning period: 75% * Startup reliability last two weeks: 87% Major Tasks * Moly/BN comparison * Commissioning of lower hybrid system * Commissioning of Long Pulse DNB DoE Quarterly 4/28/2005 Status * Pre-boronization run period complete * Vessel is now boronized with very low H/(H+D) * Lower hybrid and DNB commissioning ongoing (detailed talks to follow) * 6.75 weeks of our 17 week campaign have been completed - C-Mod Runs

192

Operation Poorman  

SciTech Connect

The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

Pruvost, N.; Tsitouras, J.

1981-03-18T23:59:59.000Z

193

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Enhancing Electron Photoemission with Nanopillar Array Enhancing Electron Photoemission with Nanopillar Array Figures: An array of nano-sized gold pillars, (a), creates a plasmonic surface resonance. (B), photoelectron kinetic energy spectrum for electrons ejected from the nanopillar array, showing significant increases compared to a flat gold surface. Working with the Molecular Foundry's Bruce Harteneck, researchers in the Lab's Ultrafast Materials and Chemical Sciences programs have verified and measured a boost in photoemitted-electron energies when assisted by the plasmonic field of a gold nanopillar array. Such enhancement provides a way to investigate plasmon dynamics, important for possible coupling to active electronics. Groups of electrons on a metal surface can oscillate coherently, a phenomenon known as a surface plasmon resonance. When excited by ultrafast

194

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Delia Milliron Delia Milliron Milliron Staff Scientist, Inorganic Nanostructures Synthesis dmilliron@lbl.gov 510.486.6723 personal website Biography Delia J. Milliron is a Staff Scientist at Lawrence Berkeley National Laboratory's Molecular Foundry, a research center and user facility for nanoscience supported by the U. S. Department of Energy. She received her PhD in Chemistry from the University of California, Berkeley, in 2004. From 2004 to 2008 she worked for IBM's research division, initially as a postdoctoral researcher and subsequently as a member of the research staff. Her research is motivated by the potential for nanomaterials to introduce new functionality to and reduce manufacturing costs of energy technologies. Her group's activities span from the fundamental chemistry of nanomaterials

195

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Yi Liu Yi Liu Liu Staff Scientist, Organic and Macromolecular Synthesis YLiu@lbl.gov 510.486.6287 personal website Biography Yi Liu is a Staff Scientist in the Organic and Macromolecular Synthesis Facility. He obtained a Ph.D. in Chemistry in 2004 from the University of California, Los Angeles under the direction of Sir. J. Fraser Stoddart. After his postdoctoral research with Professor K. Barry Sharpless at the Scripps Research Institute, San Diego, he joined the Foundry in 2006 as an independent Principle Investigator and was promoted to the career Staff Scientist in 2011. Research Interests Dr. Liu's research aims to achieve coherent control of functionality and properties across different scales through molecular level design and synthesis. With the developed materials chemistry, Dr. Liu has not only

196

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2013 15, 2013 Time: 11:00 am Speaker: Paul Abbyad, Santa Clara University Title: Microfluidic Droplet Arrays for the Study of Red Blood Cell Sickling Location: 67-3111 Chemla room We have developed a novel microfluidic device to study individual red blood cells in droplet arrays. This is a two-phase system where aqueous droplets containing cells are produced and transported in inert carrier oil. Droplets are anchored into an array by the reduction in their surface energy as they enter into microfabricated depressions. Thus, microdroplets are anchored and arranged in a 2-dimensional array against the flow of the carrier oil. The perfluorinated carrier oil has a high solubility for gases and is used as both a sink and source for oxygen exchange with the anchored

197

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Holistic Cell Design by Berkeley Lab Scientists Leads to High-Performance, Holistic Cell Design by Berkeley Lab Scientists Leads to High-Performance, Long Cycle-Life Lithium-Sulfur Battery Researchers at Berkeley Lab, including the Molecular Foundry, have demonstrated in the laboratory a lithium-sulfur (Li/S) battery that has more than twice the specific energy of lithium-ion batteries, and that lasts for more than 1,500 cycles of charge-discharge with minimal decay of the battery's capacity. This is the longest cycle life reported so far for any lithium-sulfur battery. Demand for high-performance batteries for electric and hybrid electric vehicles capable of matching the range and power of the combustion engine encourages scientists to develop new battery chemistries that could deliver more power and energy than lithium-ion batteries, currently the best

198

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Frank Ogletree Frank Ogletree Ogletree Staff Engineer, Imaging and Manipulation of Nanostructures dfogletree@lbl.gov 510.486.4862 Biography Education Postdoctoral Research Fellow with Miquel Salmeron developing ultra-high vacuum scanning tunneling microscopy in the Materials and Chemical Sciences Division, Lawrence Berkeley Laboratory, 1987 - 1988. Ph.D. in Experimental Solid State Physics, 1986, University of California, Berkeley, California. Thesis title: "Extending the Range of Low Energy Electron Diffraction (LEED) Surface Structure Determination", advisor Prof. G. A. Somorjai, Department of Chemistry. A.B. with honors in Physics, 1977, College of the University of Chicago, Chicago, Illinois. Previous Professional Positions Staff Engineer/Physicist and acting Lead Scientist, Molecular Foundry

199

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Porous Semiconducting Films Tailored for Future Energy Storage and Porous Semiconducting Films Tailored for Future Energy Storage and Conversion Devices Mesoporous films switch composition from CdSe to PbSe, Cu2Se, and Ag2Se through cation exchange: The architecture of these porous films remained intact and the chemical transformations were demonstrated to be reversible. This robustness is promising for various applications as it suggests that electronic and mechanical properties can be maintained through multiple processing and transformation stages. Scientific Achievement Molecular Foundry researchers have developed a method to create and control mesoporous architecture in metal chalcogenides (a class of semiconductors used in light- and energy-harvesting devices) that was maintained during reversible chemical transformations.

200

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Schwartzberg Schwartzberg SSchwartzberg Staff Engineer, Nanofabrication AMSchwartzberg@lbl.gov 831.247.4932 Biography Dr. Schwartzberg is a Bay Area and California native, growing up in the East Bay Area. He performed both his undergraduate and Ph.D. work at UC Santa Cruz under Professor Jin Z. Zhang in Physical Chemistry. While at Santa Cruz, he also worked at Lawrence Livermore National Labs as a graduate research fellow under Professor Thomas Huser. In graduate school, his work focused on metal nanoparticle synthesis and the application of metal nanoparticles, including surface enhanced Raman for sensing, and ultrafast electron dynamics. He received two postdoctoral research fellowships, first with Professor Stephen R. Leone at UC Berkeley, then with Dr. Jeff Urban of the Molecular. Both of these positions involved the

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Friday, August 2, 2013 Friday, August 2, 2013 Time: 11:00 am Speaker: Prof. Lian-Mao Peng, Peking University Title: Carbon Nanotube Electronics: Extending the Moore Law to the End of the Roadmap and Beyond Location: 67-3111 Chemla room Hosted by: Gary Ren Carbon nanotubes (CNT) are quasi-one-dimensional materials with unique properties and are ideal material for nanoelectronics. In particular, perfect n-type [1-2] and p-type [3] contacts are now available for controlled injection of electrons into the conduction band and holes into the valence band of the CNT, paving the way for a doping free fabrication of CNT based ballistic CMOS [4], high performance optoelectronic devices [5-6], and integrated circuits [7,8]. The feasibility of this doping free CMOS technology has been demonstrated by fabricating CMOS circuits,

202

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Weber-Bargioni Weber-Bargioni Weber-Bargioni Staff Scientist, Imaging and Manipulation of Nanostructures afweber-bargioni@lbl.gov 510.486.4026 personal website Biography Education University of Konstanz, Germany Physics B.S., 2001 Portland State University Physics M.S., 2003 University of British Columbia Physics Ph.D., 2007 Lawrence Berkeley Nat. Lab Material Science PostDoc 2008-2010 Research Interests Dr. Weber-Bargioni's research revolves around understanding fundamental opto electronic processes at their native length scales. Specifically, he is focused on understanding and eventually controlling exciton transport through complex nano composites, such as small organic molecule semiconducting films, 1, 2, and 3-D nanocrystal assemblies and nanowire systems. This research requires the employment and development of novel

203

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Uncovering the Intrinsic Size Dependence of Hydriding Phase Transformations Uncovering the Intrinsic Size Dependence of Hydriding Phase Transformations in Nanocrystals Scientific Achievement Revealed fundamental size-dependence of metal nanocrystals undergoing phase transitions. Significance and Impact Findings overturn long-held assumptions about nanoparticle behavior and hold important implications for the future design of hydrogen storage systems, catalysts, fuel cells, and batteries. Research Details Developed a unique optical probe based on luminescence that provided the first direct observations of metal nanocrystals undergoing phase transformations during reactions with hydrogen gas. Used statistical mechanical model to quantify the observational data for palladium nanocubes of all sizes. Rizia Bardhan, Lester O. Hedges, Cary L. Pint, Ali Javey, Stephen

204

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Frantisek Svec Frantisek Svec Svec Facility Director, Organic and Macromolecular Synthesis fsvec@lbl.gov 510.486.7964 personal website Biography Frantisek (Frank) received both degrees B.S. in chemistry and Ph.D. in polymer chemistry from the Institute of Chemical Technology, Prague (Czech Republic) in 1965 and 1969, respectively. In 1976 he joined the Institute of Macromolecular Chemistry of the Czechoslovak Academy of Sciences where he was promoted through the ranks to the Head of Department and the Scientific Secretary of the Institute. He accepted an offer and joined faculty at Cornell University in 1992. Since 1997, he is appointed at the University of California, Berkeley. He currently works as Facility Director in the Molecular Foundry of the Lawrence Berkeley National Laboratory. Dr.

205

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Self-assembled Single-layer 2D Frameworks Self-assembled Single-layer 2D Frameworks In the presence of macrocycle rings, rigid triangular struts are jointed and self-assemble in solution to create a supramolecular organic framework (SOF). Each strut contains functional units that resist stacking and results in single-layer 2D structures. Scientific Achievement Foundry Users have created the first 2D supramolecular organic framework (SOF) with honeycomb periodicity using a novel solution-based self-assembly approach. Significance and Impact Highly ordered and tunable SOFs lead to new layer-by-layer routes to the synthesis of complex architectures, with potential applications in gas purification, absorption, separation, sensing, and catalysis. Research Details A cross-linked 2D framework is assembled in water by joining

206

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Combinatorial Nanoscience Shines in Pure Colors Combinatorial Nanoscience Shines in Pure Colors Green/red purity vs. total intensity, observed in the various lanthanide ion combinations. The Molecular Foundry's Delia Milliron and colleagues have employed a powerful combinatorial approach to synthesize nanocrystals that glow in bright, pure colors when excited with near infrared light. - a process known as upconversion. These nanocrystals may allow for biological imaging with less harmful radiation than current methods, and can be more easily tracked and quantified due to their single color emission. Milliron's team used a wide-sweeping approach to identify promising lanthanide ion combinations, using the automatic synthesis robot, WANDA, able to perform 96 different reactions in parallel. Ultimately four

207

News item  

NLE Websites -- All DOE Office Websites (Extended Search)

Changes in Fermilab Site Security Changes in Fermilab Site Security Site Security Questions and Answers The Department of Energy has recently approved changes to the Fermilab Security Plan. These changes, which will go into effect on January 24, Security Map Fermilab map showing the public areas and restricted sections on site. (Click on image for larger version.) 2005, will ease some of the site access restrictions that have been in place since 9/11 while at the same time enhancing the overall security of the Fermilab site. Here are the highlights of the coming changes in Fermilab site security: A central corridor of public areas, shown on the attached map, will enable the public to visit much of the Fermilab site without the need for visitors' passes. The public areas include most of the recreational

208

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Foundry User Alveo Energy Receives $4M from ARPA-E Foundry User Alveo Energy Receives $4M from ARPA-E Alveo Energy-a Bay Area start-up company and Molecular Foundry user-has been awarded $4 million by ARPA-E for their project, "Open Framework Electrode Batteries for Cost-Effective Energy Storage." This venture seeks to develop a new class of batteries based on the pigment Prussian Blue to provide efficient, cost-effective support of renewable energy sources. "This ARPA-E award is an enormous opportunity for Alveo." says Colin Wessells, CEO and lead researcher for Alveo Energy. "It will allow us to rapidly push our battery technology from the final stages of lab R&D through initial pilot-scale production. " The new batteries use a family of electrode materials based on a common and

209

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Probing carrier dynamics below the surface of solar cells (A) Schematic of the 2P microscope. 2D hyperspectral maps of lifetime were created by moving the laser excitation throughout the sample. (B) Comparison of lifetimes measured with 1P and 2P microscopy. A 10x difference in lifetime is seen between traditional 1P surface measurements and the 2P sub-surface measurements. Below, cross-section depth maps of two-photon TRPL of CdTe: total PL (left); fast (center) and slow (right) lifetime components of biexponential fit, indicating potential for 3D tomography. Scientific Achievement Optically probed the charge carrier lifetime below the surface of solar materials using two-photon (2P) time-resolved PL mapping, and demonstrated that the traditional one-photon (1P) technique can underestimate the bulk

210

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Deirdre Olynick Deirdre Olynick Olynick Staff Scientist, Nanofabrication dlolynick@lbl.gov 510.495.2893 Biography Education B. S. Engineering, North Carolina State University, Raleigh, N. C. Ph.D. Department of Materials Science and Engineering. University of Illinois at Urbana-Champaign. Advisor: J. Murray Gibson. Fannie and John Hertz Fellowship Thesis: "In situ Studies of Copper Nano-particles Using a Novel Tandem Ultra-High Vacuum Particle Production Chamber Transmission Electron Microscope" Past Professional Positions Applied Materials and Technology and Matrix Integrated Systems, Senior Process Engineer Research Interests Dr. Olynick straddles the boundary between Materials Science and Chemistry to understand the science behind nanofabrication. Dr. Olynick studies

211

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

3, 2013 3, 2013 Time: 11:00 am Speaker: Alex Weber-Bargioni, The Molecular Foundry Title: Investigating the Propagation of Optically Excited States and Optoelectronic Processes in Nano Building Block Assemblies Location: 67-3111 Chemla room Controlling individual excited states and their deliberate movement through a material is one of the ultimate goals that will provide material scientist with a complete new freedom to develop novel material functionalities. Realizing such a control would enable to direct energy to specific sites in a material where specific work can be performed. Nano materials have in principle the potential to realize this vision since the material property determining electronic structure can be tuned via geometry, material composition, interfaces and environment. However, we are

212

News item  

NLE Websites -- All DOE Office Websites (Extended Search)

HUMAN RIGHTS, NONDISCRIMINATION, HUMAN RIGHTS, NONDISCRIMINATION, ANTIHARASSMENT AT FERMILAB If you encounter discrimination or harassment at Fermilab, tell someone you trust. Talk to your supervisor, to Equal Employment Opportunity Manager Dianne Engram (4633), or to laboratory management, including the Laboratory Director Michael Witherell. You can call the Fermilab Action Line at 840-4000 to make your concerns known anonymously. If you feel you need to talk with someone outside the laboratory, you can talk directly to Corporate Counsel, URA, Inc., Washington, D.C. at 202-293-1382. You can call the hotline of the Inspector General of the Department of Energy at 1-800-541-1625 or 1-202-586-4073. You can also communicate directly with the DOE Area Manager's Office (x3281). HUMAN RIGHTS POLICY

213

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

List List 80+ Reactive Ion Etcher (tool referred to as the RIE by nanofab staff) AAPPTec Apex 396 Peptide Synthesizer AB Sciex TF4800 MALDI-TOF-TOF - Ideal for small molecules and (bio)polymers between 500 and 150,000 Da molecular weights ABM optical contact printer Agilent (Molecular Imaging) PicoPlus Scanning Probe Microscope Agilent 1100 series (ion trap) LC-MS-MS Mass spectrometer Agilent 1100 Series Agilent 1200 nanoHPLC System Agilent 1260 Infinity Agilent analytical HPLC Agilent Capillary Electrophoresis System Agilent Cary 5000 UV-Vis-NIR Spectrophotometer Agilent GC-MS 6890 Chromatograph Agilent Precision Semiconductor Parameter Analyzer Agilent prep and semi-prep HPLC's Aixtron PECVD for carbon nanotubes and graphene Anaerobic chamber Arbin Electrochemical Battery Tester

214

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

A Comprehensive Model for Molecular-Bond Formation and Rupture A Comprehensive Model for Molecular-Bond Formation and Rupture Force spectra of ten different kinds of molecular bonds show transition from near-equilibrium to a kinetic regime. Inset, data re-plotted on the natural axes that emerge from the model show that it provides a universal description of bond breaking across the two regimes. Developed a new model for interpreting molecular-bond force spectra and verified it with measurements of ten different molecular systems Resolves inconsistencies in the standard model and provides a comprehensive description of bond formation and rupture Enables prediction of binding free energy of a molecular system, important for both understanding interactions in natural systems and designing synthetic analogues R.W. Friddle, and J.J. De Yoreo, Lawrence Berkeley National Laboratory; A.

215

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

24, 2013 24, 2013 Time: 11:00 am Speaker: Prof. Holger Schmidt, UC Santa Cruz Title: Detecting and Controlling the Magnetization Dynamics of Single Nanomagnets Location: 67-3111 Chemla room Hosted by Frank Svec: Many emerging spintronics applications will utilize dense arrays of nanomagnetic elements. Device properties depend on both the intrinsic material properties of each element as well as the magnetic environment. Time-resolved magneto-optics provide a means to extract both static and dynamic material parameters and elucidate sub-picosecond dynamic processes. I will review the challenges and capabilities of applying magneto-optic techniques for magnetic characterization of individual nanomagnets, in particular the first observation of single-domain nanomagnet dynamics and

216

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Urban Urban Jeff Urban Facility Director, Inorganic Nanostructures Lead of LBL DOE Thermoelectrics Program (Acting) jjurban@lbl.gov 510.486.4526 Biography Education Postdoctoral Studies in Synthesis and Measurements of Nanocrystal Transistors, Thermoelectrics, and Photovoltaics with Professor Christopher B. Murray, University of Pennsylvania Graduate Studies in Synthesis and Physical Characterization of Transition Metal Oxide Nanostructures with Professor Hongkun Park, Harvard University Research Interests I am interested in the development of new materials and measurement tools for solid-state energy storage and conversion applications. One central topical area of interest involves investigating transport at the organic-inorganic interface. This marriage of "hard" and "soft" materials

217

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Foundry User Wins "Genius Award" Foundry User Wins "Genius Award" Courtesy of John D. and Catherine T. MacArthur Foundation Molecular Foundry User, Craig Fennie, received one of this year's 24 MacArthur Fellowship Awards - commonly known as "Genius Awards" - for his research on the material properties of new nanostructures. Fennie, assistant professor of applied and engineering physics at Weill Cornell Medical College, has designed new materials with electrical, optical and magnetic properties needed for electronics and communication technology. At the Foundry, he has worked with staff and Users in the Theory of Nanostructured Materials Facility to engineer transition metal oxide thin films to access energetically useful optical properties of photoelectrochemistry. Read the story from the MacArthur Foundation.

218

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Neaton Neaton Jeff Neaton Director, Molecular Foundry Senior Faculty Scientist, Theory of Nanostructured Materials jbneaton@lbl.gov 510.486.4527 personal website Biography Jeffrey B. Neaton is the Director of the Molecular Foundry, where he also serves as a Senior Faculty Scientist in the Theory of Nanostructured Materials Facility. Dr. Neaton received a B.S. in Physics and Astrophysics from the University of Minnesota and a Ph.D. in Physics from Cornell University. He was a Departmental Postdoctoral Associate in Physics at Rutgers University prior to joining the Molecular Foundry, first as a postdoc and then as a staff member. In 2009 he was award the Presidential Early Career Award for Scientists and Engineers, and 2010 he was an National Academy of Sciences Kavli Fellow. Since 2012, he has been Division

219

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Revealing nanorod formation with liquid-cell TEM Revealing nanorod formation with liquid-cell TEM Sequential TEM images show Pt3Fe nanorods forming by first making a kinked chain which then straightens out. On right, High-resolution STEM images reveal changes in crystal orientation as the chains relax. Materials Science Division researcher Haimei Zheng, the Molecular Foundry's Stephen Whitelam, and colleagues have imaged iron-platinum nanoparticle forming from solution, helping resolve a decades-long debate about growth dynamics. By understanding how nanoparticles grow, researchers can better tailor their properties for cheap, efficient energy-related technologies. Researchers have long assumed that nanoparticles grow in solution as molecules gradually attach to a nanoparticle nucleus, but recently they

220

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering electron nanoconduits in living bacteria Engineering electron nanoconduits in living bacteria This schematic shows that balanced expression of the Mtr electron conduit from Shewanella oneidensis in Escherichia coli enables E. coli to pass electrons across the membrane to an anode. Scientific Achievement A few specialized bacteria contain electron transfer protein complexes - electron nanoconduits - that allow them to reduce or oxidize an electrode. By exploring factors that control the synthesis of these electron nanoconduits, the model microbe Escherichia coli was engineered to deliver current to an electrode. Significance This work identifies conditions that allow for this electron transport system to be synthesized and function as electrical interface in non-native cell types. These cells can then interact directly with electronics,

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Making a Map for Nanotube Exploration Making a Map for Nanotube Exploration Figures: Electron diffraction patterns and Rayleigh spectra of carbon nanotubes with different chiral indices. Inset, top, an illustration of a single nanotube suspended across a gapped substrate for measurement. An international team of scientists headed by Feng Wang of the Materials Science Division of Berkeley Lab and Enge Wang of the International Center for Quantum Materials in Beijing, has mapped out an "atlas" of key structural and optical properties of carbon nanotubes. By painstakingly measuring both electron diffraction and optical scattering for hundreds of samples, the team created a reference to accelerate future nanotube studies for fundamental physics research as well as optoelectronic and photonic

222

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Gang (Gary) Ren Gang (Gary) Ren Ren Staff Scientist, Imaging and Manipulation of Nanostructures gren@lbl.gov 510.495.2375 personal website Biography Education B.A., Theoretical Physics, Lanzhou University, China, 1986-1990 M.S., Theoretical Physics (General relativity and gauge theory), Lanzhou University, China, 1990-1993, Advisor: Prof. Yi-shi Duan. Thesis: "Theory and Application of 2+1 Dimensional Topological Current" Ph.D. Material Physics (Electron microscopy), Univ. of Science and Technology Beijing, and Beijing Laboratory of Electron Microscopy, Chinese Academy of Science, Beijing, China, 1993-1997, Advisor: Profs. Lian-mao Peng (2012 chair of IUCr -Commission of Electron crystallography) and Kehsin Kuo, Thesis: "Quantitative Electron Diffraction Theory and

223

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Prendergast Prendergast David Prendergast Director (acting), Theory of Nanostructured Materials dgprendergast@lbl.gov 510.486.4948 website Research Interests My current work focuses on using many-body electronic structure techniques to compute the excited state properties of materials from first-principles, with an emphasis on complex nanostructures, such as carbon nanotubes, which exhibit strong excitonic effects due to quantum confinement. Learn more about my research on my nanotheory page. Current Projects Computing excitonic states with accurate accounting of electron-hole binding via solution of the Bethe-Salpete equation Electron-Hole Interaction in Carbon Nanotubes: Novel Screening and Exciton Excitation Spectra In summary, our analysis shows that the use of an electron-hole interaction

224

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Making Smart Windows Even Smarter Making Smart Windows Even Smarter Nanocrystals of indium tin oxide (shown here in blue) embedded in a glassy matrix of niobium oxide (green) form a composite material that can switch between NIR-transmitting and NIR-blocking states with a small jolt of electricity. A synergistic interaction in the region where glassy matrix meets nanocrystal increases the potency of the electrochromic effect. Scientific Achievement Researchers have created a thin coating of nanocrystals embedded in glass that can dynamically modify sunlight as it passes through a window. Significance and Impact Unlike existing technologies, the coating provides selective control over visible light and heat-producing near-infrared (NIR) light, so windows can maximize both energy savings and occupant comfort in a wide range of

225

Research Items  

Science Journals Connector (OSTI)

... alloys are described by Dr. N. F. Budgen in the Chemical Trade Journal for December 26, 1924. The "flint "of the popular type of gas-lighter was introduced by ... Scientific and Medical Association on September 26, 1924, is printed in Die Naturwissenschaften of December 26. The paper deals with the calculation of physical and chemical constants from data as ...

1925-01-31T23:59:59.000Z

226

Research Items  

Science Journals Connector (OSTI)

... from the energy supplied to the ring. In this latter case the effect of artificially roughening the surface of one of the rings was specially investigated. In common with previous ... , being found in the case of the smooth rings. In the case of the roughened rings, however, fairly close agreement is found over a considerable range of speed. ...

1926-11-20T23:59:59.000Z

227

Research Items  

Science Journals Connector (OSTI)

... then stepped up to 88,000 volts, at which pressure it is transmitted to 12 substations spaced about 15 miles apart. This distance is very short compared with the Chicago ... the density of the traffic and the necessity of working to schedule speeds. All the substations are fully automatic, so that attendants are not required. As thunderstorms in Natal are ...

1928-05-05T23:59:59.000Z

228

Research Items  

Science Journals Connector (OSTI)

... the Scientific Monthly for November, Prof. Kimball Young discusses the results of applying intelligence tests to various immigrant groups in America. He points out that whereas up to the ... earlier inhabitants, then the consequences will be serious for the future. In order to test intelligence, the writer used the already well-known American Army ...

1922-11-25T23:59:59.000Z

229

Research Items  

Science Journals Connector (OSTI)

... translated a short article by the latter describing the method of use of the tables. OIL AND GAS .AT BELL SPRINGS, WYOMING.-The enterprise of the American people in ... SPRINGS, WYOMING.-The enterprise of the American people in continuing their detailed search for oil in the ...

1928-06-09T23:59:59.000Z

230

Research Items  

Science Journals Connector (OSTI)

... All these substances maybe depicted as obtained from the parent compound by simple processes of isomerisation, hydration, dehydration, oxidation, and reduction, while geraniol itself may originate from such ... the same hydrogen atom to the other side of the double bond leads to A,carene. Prof. Read hopes to submit his interesting ideas to experimental investigation; the problem ...

1929-09-14T23:59:59.000Z

231

Research Items  

Science Journals Connector (OSTI)

... complete spark-over. Internal discharges may be the immediate cause of breakdown due to local overheating, but their effects are more commonly cumulative, the most important probably being the carbonization ... are fully satisfied for the asymptotic orbits that were constructed.

1944-09-16T23:59:59.000Z

232

Research Items  

Science Journals Connector (OSTI)

... A paper on the Belfast Airport, by 8. P. Mercer and P. A. Lineham, describes some fascinating ecological transformations from dredged mud to turf which can support a ...

1939-06-10T23:59:59.000Z

233

Research Items  

Science Journals Connector (OSTI)

... if self-pollination can be of much practical use in the breeding of red clover. Humble bees are the chief agents in effecting cross-pollination at Aberystwyth and in Montgomeryshire, ... and in Montgomeryshire, honey bees playing but a very small part. Six species of humble bees were observed on red clover, B. agrorum and B. hortorum being by ...

1925-07-25T23:59:59.000Z

234

Research Items  

Science Journals Connector (OSTI)

... the motors were of the 3-phase double-wound squirrel-cage-rotor type controlled by contactor-type star-delta starters. During the starting period, the current was found to be ...

1944-07-29T23:59:59.000Z

235

Research Items  

Science Journals Connector (OSTI)

... of cavities mentioned above, there are also lamellar types representing anhydrite and possibly calcite and babingtonite, and a miscellaneous series after apophyllite, quartz, calcite, natrolite, pectolite, and other ...

1932-07-30T23:59:59.000Z

236

Research Items  

Science Journals Connector (OSTI)

... Javanese culture. A report of the discussion appears in a translation by Mary A. Riis in the Indian Antiquary for December.. Among the speakers, Mr. Maclaine Pont enforced ...

1926-01-16T23:59:59.000Z

237

Research Items  

Science Journals Connector (OSTI)

... region has been divided into six districts covering the three areas of drainage-the Dry Cimmaron, the Canadian River, and the Pecos River. The region as a whole contains ...

1937-07-10T23:59:59.000Z

238

Research Items  

Science Journals Connector (OSTI)

... was commenced in June 1923 by the Wear Flint Glass Works; the manufactured articles include teapots, cooking utensils, and such like, besides the more conventional test-tubes, beakers, ...

1925-05-09T23:59:59.000Z

239

Research Items  

Science Journals Connector (OSTI)

... enzymes present in the gut are an amylase, a protease, and a lipase. The reserve materials are stored in the body as fat and glycogen; the latter occurs in ... -dahl. Coal obviously arises from plants, and the different types of plants responsible for lignite and coal respectively can, to a considerable extent, still be recognised by the microscope ...

1930-11-29T23:59:59.000Z

240

Research Items  

Science Journals Connector (OSTI)

... small extent; the fleshy roots, on the other hand, accumulated far less weight of reserve material upon the ringed plants. The author scarcely appears to put the simplest interpretation ... and of a remarkable series of thin sections of the sapropelic ooze.

1923-03-17T23:59:59.000Z

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Alison Hatt to Direct User Program Alison Hatt to Direct User Program Alison Hatt has been chosen to head the Molecular Foundry's User Program. She is succeeding David Bunzow, who is retiring this month. As User Program Director, Alison will be responsible for overseeing the Foundry's scientific proposal process, including administration associated with User proposal submissions, peer reviews, and scheduling approved projects; working with scientific staff to reach out to and grow new diverse, engaged and productive User communities; liaising with User Executive Committee leadership; and supervising the User Program Office staff. As a former Foundry postdoctoral scientist, Alison brings a diverse skill set and unique experience to the position. Since 2011, she has served as Public Affairs Specialist for the Materials Sciences Division (MSD) where

242

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Weber-Bargioni Shares Love of Bike Racing with Local Community Weber-Bargioni Shares Love of Bike Racing with Local Community If you've ever tried to take a sharp turn at high speed on a bicycle, you may have wished you knew more about bicycle physics. And while the basic movement feels simple, riding a bike is in fact quite complex. "It turns out the physics of riding a bike are really, really hard," confessed Alex Weber-Bargioni, a Berkeley Lab materials scientist. Weber-Bargioni was addressing a standing-room-only crowd at the Actual Café in North Oakland recently, in the first of a new series called "Actual Science" Sponsored by Berkeley Lab's Materials Sciences Division. A nanoscientist by day, Weber-Bargioni helps pioneer new approaches to studying the way light interacts with matter, a crucial aspect of today's burgeoning solar-energy

243

Research Items  

Science Journals Connector (OSTI)

... and Tegetmeyer) showed a reduction from 7-70 pairs before the storm, and values oscillating about 7-60 after the storm, to values of 7-05 during the storm. ... . The value of this parameter fits in with ordinary ideas of atomic dimensions.

1932-10-15T23:59:59.000Z

244

Performing an allreduce operation using shared memory  

DOE Patents (OSTI)

Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

Archer, Charles J. (Rochester, MN); Dozsa, Gabor (Ardsley, NY); Ratterman, Joseph D. (Rochester, MN); Smith, Brian E. (Rochester, MN)

2012-04-17T23:59:59.000Z

245

Status of French flaw evaluation procedures  

SciTech Connect

The RSE-M Code is under development in France and the 1996 edition will include a complete flaw evaluation procedure for operating PWRs. For FBRs the authors have developed the RCC-MR for design and they are now developing RSE-MR rules for operating plants; a first set of flaw evaluation rules are proposed in the A16 document for low and high temperature regime. After some comments on the organization of RSE and RCC Committees, the paper presents: (1) the status of the different French code rules (RSE-M and A16 document); (2) how can one take into consideration some complex geometry or loading case situations; (3) some comparisons with ASME Code-Section XI; and (4) few examples of major on-going developments for flaw evaluation for different components. In conclusion, two different sets of rules are under development one in RSE-M for PWRs and one in RSE-MR for FBRs using partly the A16 proposals. These rules have to remain consistent, but not necessary identical due to the specific components covered by these documents. The components can be very different in term of pressure load, operating temperature, transient thermal loads and seismic loads.

Faidy, C. [Electricite de France-SEPTEN, Villeurbanne (France); Barthelet, B. [Electricite de France-EPN, Paris La Defense (France); Drubay, B. [CEA CEN Saclay, Gif-sur-Yvette (France)

1996-12-01T23:59:59.000Z

246

WIPP Status and Plans - 2013 - 13379  

SciTech Connect

An up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository is presented in this paper. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize defense transuranic waste for final shipment and emplacement in WIPP. The Waste Isolation Pilot Plant (WIPP) is completing its 14. year of operations. Five of the ten planned disposal panels have been filled and sealed from ventilation, with about half of the legislated volume capacity consumed. About 11,000 shipments have been made successfully, traveling more than 40 million kilometers across the nation's highways. A fleet of new Type B shipping packages, the TRUPACT-III, has been added to the transportation capability, with an ongoing campaign to de-inventory large waste items from the Savannah River Site, while minimizing size reduction and repackaging. A new shipping and emplacement method for remote handled waste in shielded containers has been approved for disposal, and will significantly improve operational efficiency. Remote handled waste packaged in these shielded containers will be shipped, handled and emplaced as contact handled waste. Also described is a new criticality control over-pack container, which will improve efficiency when shipping high fissile-content waste streams consisting of Special Nuclear Material declared as waste from nuclear weapons sites. The paper describes the importance of the infrastructure at WIPP to ensure disposal site availability for defense transuranic waste sites across the weapons complex. With the facility reaching its original design lifetime, there are many infrastructure maintenance and improvements being planned and performed. (authors)

Nelson, R.A.; Franco, J. [U.S. Department of Energy, PO Box 3090, Carlsbad, NM 88220 (United States)] [U.S. Department of Energy, PO Box 3090, Carlsbad, NM 88220 (United States)

2013-07-01T23:59:59.000Z

247

Current status of the GLASS code  

SciTech Connect

This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970's. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

Hootman, H.E. (Westinghouse Savannah River Co., Aiken, SC (United States)); Honeck, H.C. (Computer Application Technology, Inc., Aiken, SC (United States))

1991-01-01T23:59:59.000Z

248

Current status of the GLASS code  

SciTech Connect

This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970`s. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

Hootman, H.E. [Westinghouse Savannah River Co., Aiken, SC (United States); Honeck, H.C. [Computer Application Technology, Inc., Aiken, SC (United States)

1991-12-31T23:59:59.000Z

249

Annual Hanford Site Environmental Permitting status report  

SciTech Connect

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

250

AD-7/GBAR status report for the 2015 CERN SPSC  

E-Print Network (OSTI)

The GBAR experiment will use one of the low energy antiproton beam lines from the ELENA ring that is being prepared and scheduled to start operating in 2017. The apparatus is broadly divided into four sections: antiproton deceleration and focussing, positron production and accumulation, antihydrogen cooling and preparation, and detection. In the following, we give updates on the different parts and the status of preparation for installation in the AD hall, referring to the previous report that was submitted in April of 2014

Banerjee, D; Brook-Roberge, D; Charlton, M; Clad, P; Comini, P; Crivelli, P; Dalkarov, O; Debu, P; Douillet, A; Dufour, G; Dupr, P; Eriksson, S; Froelich, P; Grandemange, P; Guellati, S; Gurout, R; Heinrich, J-M; Hervieux, P-A; Hilico, L; Husson, A; Indelicato, P; Jonsell, S; Karr, J-P; Khabarova, K; Kolachevsky, N; Kuroda, N; Lambrecht, A; Leite, A M M; Liszkay, L; Lotrus, P; Lunney, D; Madsen, N; Manfredi, G; Mansouli, B; Matsuda, Y; Mohri, A; Mortensen, T; Nagashima, Y; Nesvizhevsky, V; Nez, F; Prez, P; Regenfus, C; Rey, J-M; Reymond, J-M; Rouss, J-Y; Reynaud, S; Rubbia, A; Sacquin, Y; Schmidt-Kaler, F; Sillitoe, N; Staszczak, M; Szabo-Foster, C I; Torii, H; Vallage, B; Valdes, M; van der Werf, D P; Voronin, A; Walz, J; Wolf, S; Wronka, S; Yamazaki, Y

2015-01-01T23:59:59.000Z

251

National Aeronautics and Space Administration Human Exploration & Operations  

E-Print Network (OSTI)

)/Ground Operations. · Continue strong momentum on Commercial activities. · Conduct remaining launches in LaunchNational Aeronautics and Space Administration Human Exploration & Operations Reorganization Status capabilities to conduct NASA's aeronautics and space activities. 6. Share NASA with the public, educators

Waliser, Duane E.

252

Microsoft Word - BSA_NC_Items_Rev6 eVerify Final.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6; (Jan. 2010) 1 of 13 6; (Jan. 2010) 1 of 13 ATTACHMENT A BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NON-COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Article 1 Definitions 2 Article 2 Order of Precedence 2 Article 3 Acceptance of Agreement 2 Article 4 Complete Agreement 3 Article 5 Assignment 3 Article 6 Compliance with Laws and Regulations 3 Article 7 Independent Contractor; Hold Harmless 3 Article 8 Notice Regarding Late Delivery 3 Article 9 Inspection and Acceptance 4 Article 10 No Waiver 4 Article 11 New Materials 5 Article 12 Suspect/Counterfeit Items 5 Article 13 Hazardous Material Identification and Material Safety Data 6 Article 14 Title and Risk of Loss 6 Article 15 Warranty 6 Article 16 Payment 6 Article 17 Taxes 7 Article 18 Extras 7

253

MONTICELLO NPL SITES Minutes and Action Items of the Federal Facilities Agreement Meeting  

Office of Legacy Management (LM)

Minutes and Action Items of the Federal Facilities Agreement Meeting Minutes and Action Items of the Federal Facilities Agreement Meeting September 16 and 17,2008 Meeting Location U.S. Department of Energy Site Office, Monticello, Utah Meeting Attendees Jalena Dayvault- U.S. Department of Energy Tim Bartlett- S.M. Stoller Todd Moon- S.M. Stoller Linda Sheader- S. M. Stoller Paul Wetherstein- S.M. Stoller Brent Everett- Utah Department of Environmental Quality Duane Mortensen- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Rob Stites- U.S. Environmental Protection Agency (participated by phone) Christina Wilson- U.S. Environmental Protection Agency (participated by phone) Meeting topics and discussion points are summarized under the headings listed below. The agenda and copies of handouts presented during the meeting are attached to this report.

254

Microsoft Word - BSA NC Items Rev9 draft clean _3_.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

9; (Apr. 2011) 1 of 16 9; (Apr. 2011) 1 of 16 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NON-COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Article 1 Definitions 2 Article 2 Order of Precedence 2 Article 3 Acceptance of Agreement 2 Article 4 Complete Agreement 3 Article 5 Assignment 3 Article 6 Compliance with Laws and Regulations 3 Article 7 Independent Contractor; Hold Harmless 3 Article 8 Notice Regarding Late Delivery 4 Article 9 Inspection and Acceptance 4 Article 10 No Waiver 5 Article 11 New Materials 5 Article 12 Suspect/Counterfeit Items 5 Article 13 Hazardous Material Identification and Material Safety Data 6 Article 14 Title and Risk of Loss 6 Article 15 Warranty 6 Article 16 Payment 7 Article 17 Taxes 7 Article 18 Extras 7

255

HG ADSORBER (ITEM 7) ATTACHED TO SIDE WALL OF CONTAINMENT BOX  

E-Print Network (OSTI)

1 NOTE: HG ADSORBER (ITEM 7) ATTACHED TO SIDE WALL OF CONTAINMENT BOX WITH SS STRAPS. FLEX TUBING CONNECTS ADSORBER TO SUMP TANK CHKVALVE AND LID-MOUNTED FILTER 5 3 2 7 4 6 1 --- PRIMARY CONTAINMENT ASSY SHCS - 5/8-11 x 1.00 N/A 6 1 hg adsorber hjt --- KOBY HG ADSORBER, MF-2JKCB, PROVIDED BY PRINCETON N

McDonald, Kirk

256

Surveillance Guide - OPS 9.8 Control of Equipment and System Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTROL OF EQUIPMENT AND SYSTEM STATUS CONTROL OF EQUIPMENT AND SYSTEM STATUS 1.0 Objective The objective of this surveillance is to verify that the contractor has established and implemented an effective program to control equipment and system status. The surveillance activities provide a basis for verifying the effectiveness of the contractor's program as well as compliance with DOE requirements. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 2.2 DOE-STD-1039-93, Guide to Good Practices for Control of Equipment and System Status 3.0 Requirements Implemented This surveillance is conducted to implement requirements of the Functions, Responsibilities and Authorities Manual, Section 20, Operations, FRAM #s 4253, 4258, and 4261. These requirements are

257

Improving reverse logistics processes using item-level product life cycle management  

Science Journals Connector (OSTI)

Sustainability is a key issue for companies offering products and services on the global market. The ever-increasing worldwide demand for raw materials in combination with the rising costs for materials and energy challenges companies to make their products, processes and services more sustainable. More and more customers are demanding sustainable products and services due to their increased awareness about environmental protection. By providing access to data, information and knowledge about products and services the concept of product life cycle management (PLM) can be applied to reverse logistics processes to improve sustainability. The term PLM and, therefore, the functionality of existing PLM systems must be considered as quite different. This paper introduces the concept of item-level PLM. It investigates the requirements that item-level PLM systems must fulfil in order to support sustainability in reverse logistics processes in an appropriate manner. Existing item-level PLM solutions are then investigated according to their suitability in the field of reverse logistics.

Carl Hans; Karl A. Hribernik; Klaus-Dieter Thoben

2010-01-01T23:59:59.000Z

258

CMS FNAL Remote Operations Center  

NLE Websites -- All DOE Office Websites (Extended Search)

LHC@FNAL Remote Operations Center (ROC) at Fermilab is located on the first floor of Wilson Hall. From the ROC, shifters perform real-time monitoring of the data recorded by the CMS Experiment. LHC@FNAL Remote Operations Center (ROC) at Fermilab is located on the first floor of Wilson Hall. From the ROC, shifters perform real-time monitoring of the data recorded by the CMS Experiment. ROC WBM / WBM Twiki FNAL ELog Mailing List Agendas / ROC Presentations & Notes WBM Publications Runs CVS SiTracker / MTCC AEM / AEM help Screen Snapshot Service FAQ Accounts & Nodes New User Instructions WebCams CMS Workbook Directories / Glossaries Photos Vidyo / EVO Google / Wikipedia LHC@FNAL Computing Console Map Documents Mailing List One East Mtg Schedule rocshare Telephones To Do List Video Conferencing CMS Shifter CSC DAQ DataOps DQM / FNAL ROC ECAL Event Display HCAL Pixel Trigger Global Run Calendar CMS Live Contact List DAQ Status DAS

259

BNL | ATF Operations Weekly Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Weekly Summary Operations Weekly Summary Week Starts E-beam Status CO2 Status 2013/12/30 Up time: 0 days Down time: 5 days Activity: Maintenance & holiday week Up time: 0 days Down time: 5 days (setup) Activity: OPA work & holiday week 2013/12/23 Up time: 1 days Down time: 4 days (holiday week) Exp: Beam Studies Group: ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days Activity: OPA work & holiday week 2013/12/16 Up time: Down time: Exp: AE-58, ERL BPM testing + beam studies Group: AE58, BNL (C-AD) / ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days (setup) Activity: OPA work, EUVL test setup (AE59) and maintenance 2013/12/09 Up time: Down time: Exp: AE-52, Beam Manipulation by self wakefield Group: AE52, Euclid techlabs Energy: 57.6 MeV

260

Geothermal electric power plant status  

SciTech Connect

A status summary of the activity for the 44 proposed geothermal electric power plants in the United States as of March 31, 1981 is presented, as well as the power on-line electric plants to date. The information comes from the Department of Energy Geothermal Progress Monitor System (DOE, 1981).

Murphy, M.; Entingh, D.J.

1981-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ESnet Network Measurement Current Status  

E-Print Network (OSTI)

1 ESnet Network Measurement Current Status Joe Metzger Jan 24th 2008 ESCC meeting Energy SciencesSONAR collaboration focused on dynamic hybrid network issues ­ publication, visualization, and analysis of dynamic Architecture ­ Protocols based on the Open Grid Forum Network Measurement Working Group Schemas · Several

262

Advanced Collaborative Emissions Study (ACES): Phase 2 Status...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

: Phase 2 Status Report Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report Discusses status of ACES, a cooperative multi-party effort to characterize emissions...

263

Status of Hydrogen Storage Technologies | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Current Technology Status of Hydrogen Storage Technologies Status of Hydrogen Storage Technologies The current status in terms of weight, volume, and cost of various hydrogen...

264

Conduct of operations: The foundation of safety -- An overview  

SciTech Connect

This paper discusses issues and approaches dealing with conceptualizing, implementing, and maintaining configuration control commensurate with the conduct of operations approach defined by DOE ORDER 5480.19. Specific topics reviewed will include key elements of assessments to determine the status quo such as assessment criteria, assessment personnel, and assessment scope; administrative programs to maintain the status quo such as organizational definition, responsibilities, interfaces, and priorities; oversight to determine control effectiveness via compliance and performance assessment.

Willett, D.J.; Hertel, N.E.

1992-05-01T23:59:59.000Z

265

WIPP Status Update | Department of Energy  

Office of Environmental Management (EM)

from May 14-16, 2013 in Buffalo, NY. WIPP Status Update More Documents & Publications EIS-0026-SA-08: Supplemental Analysis Waste Isolation Pilot Plant Status and Plans - 2010...

266

Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422.1, CONDUCT OF OPERATIONS 422.1, CONDUCT OF OPERATIONS Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS The general approach to implementing DOE O 422.1 is for contractors to develop, for DOE line management approval, documentation demonstrating implementation of the requirements in the contractor requirements document (CRD). DOE line management means the Federal officials such as Secretarial Officers and heads of field elements responsible for DOE facilities and operations. It is necessary to provide a conduct of operations matrix, which is a list of CRD requirements, citing the specific documentation that implements each item, or providing justification for each item that is not implemented. DOE line management must determine which facilities, other than hazard category 1, 2, and 3 nuclear facilities, require implementation

267

Webinar: National Hydrogen Learning Demonstration Status  

Energy.gov (U.S. Department of Energy (DOE))

Video recording and text version of the webinar, "National Hydrogen Learning Demonstration Status," originally presented on February 6, 2012.

268

Facility Operations Office, Brookhaven National Laboratory, BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Operations Office Facility Operations Office Safely supporting the missions of the laboratory... The Facility Operations Office addresses key issues in work planning, maintenance engineering, service-delivery models, and annual facility-work plans. Facility Operations Center: The Facility Operations Center provides computer programs designed to assist in the planning, management and administrative procedures required for an effective maintenance and asset management process. As an information technology tool for managing the maintenance process, a Computerized Maintenance Management System (CMMS) is a mission-essential part of any organization, and a tool for success. Infrastructure Management: IM's goal is to ensure Brookhaven National Laboratory real property assets are planned for, managed, tracked, and upgraded as required in order to meet BNL's current and future programmatic needs. To accomplish this IM performs site and utilities master planning, manages BNL's new project request and prioritization system (3PBP), maintains utilities maps, manages BNL's space and facilities data base, and provides program management for BNL's GPP, Line Item and Operating Funded Project programs.

269

3Compliance Status 2004 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

3-1 3Compliance Status 2004 SITE ENVIRONMENTAL REPORT DRAFT Brookhaven National Laboratory (BNL County Department of Health Services. Thirty reportable spills of petroleum products or antifreeze status #12;3-22004 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS DRAFT 3.2.2 New or Modified

270

Design of a demand driven multi-item-multi-stage manufacturing system : production scheduling, WIP control and Kanban implementation  

E-Print Network (OSTI)

The project is conducted in a multi-item-multi-stage manufacturing system with high volume products. The objectives are to optimize the inventory structure and improve production scheduling process. The stock building plan ...

Zhou, Xiaoyu, M. Eng Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

271

Annual Hanford Site environmental permitting status report  

SciTech Connect

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

272

Status and Future of TRANSCOM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steve Casey Steve Casey U.S. Dept. of Energy Carlsbad Field Office  Current Program status g  Upcoming Changes  Glimpse at future options  DOE Commitments 2 6/3/2010 2  Current Program status g * Computer Based Training * User Support Site * Program Support * Program Accomplishments U i Ch  Upcoming Changes  Glimpse at future options  DOE Commitments 3  1 st release - December 2009 9  Covers general user training  Allows organizations access to training without waiting for a traditional class  Computer security module to be added Autumn 2010 Autumn 2010  Shipper/Scheduler training - being considered 4 6/3/2010 3  Completely overhauled in p y 2009  Features are user friendly  Layout more intuitive

273

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

274

Items Supporting the Hanford Internal Dosimetry Program Implementation of the IMBA Computer Code  

SciTech Connect

The Hanford Internal Dosimetry Program has adopted the computer code IMBA (Integrated Modules for Bioassay Analysis) as its primary code for bioassay data evaluation and dose assessment using methodologies of ICRP Publications 60, 66, 67, 68, and 78. The adoption of this code was part of the implementation plan for the June 8, 2007 amendments to 10 CFR 835. This information release includes action items unique to IMBA that were required by PNNL quality assurance standards for implementation of safety software. Copie of the IMBA software verification test plan and the outline of the briefing given to new users are also included.

Carbaugh, Eugene H.; Bihl, Donald E.

2008-01-07T23:59:59.000Z

275

Formal Specification of Operating System Operations  

E-Print Network (OSTI)

Formal Specification of Operating System Operations Dan Zhou Department of Computer Science.black@nist.gov This paper describes the development of a formal specification for a secure operating system architecture operations. We also provide a uniform environment for system commands that change the security state

Black, Paul E.

276

June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL TECHNICAL CAPABILITY PANEL FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete Deputy Manager, Carlsbad Field Office Vacant Director for the Office of Site Operations Donald "Casey" Gadbury Yes Yes No Complete Director for the Office of Environment, Safety and Health/CBFO FTCP Agent George T. Basabilvazo Yes Yes No Complete 3 FEDERAL TECHNICAL CAPABILITY PANEL

277

June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL TECHNICAL CAPABILITY PANEL FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete Deputy Manager, Carlsbad Field Office Vacant Director for the Office of Site Operations Donald "Casey" Gadbury Yes Yes No Complete Director for the Office of Environment, Safety and Health/CBFO FTCP Agent George T. Basabilvazo Yes Yes No Complete 3 FEDERAL TECHNICAL CAPABILITY PANEL

278

The Status and Future of AERIs in ARM  

NLE Websites -- All DOE Office Websites (Extended Search)

Status and Future of AERIs Status and Future of AERIs in ARM Dave Turner Space Science and Engineering Center University of Wisconsin - Madison Longwave/Microwave Focus Group 11 March 2008 ARM STM, Norfolk, VA Background * Spectrally resolved IR radiances were considered key component of ARM's observational strategy * Stringent requirements placed on absolute radiometric accuracy (1% ambient radiance), spectral accuracy, noise level, and operability * Instrument development was successful! * ARM has 8 AERI systems: * 11 Million calibrated sky spectra have been collected by ARM AERIs (up to Dec 2007) * SGP-01 * SGP-E14 * AMF-M1 * NSA-C1 (ER) * TWP-C2 * TWP-C3 * Spare (NR) * Spare (ER) AERI Interferometer Assembly AERI Interferometer Assembly Bomem Interferometer ABB HBB Optics Optics Bench Bench Shock

279

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart This chart represents anticipated activity and is not a commitment for documentation or dates. October 21, 2011 EIS-0426: Notice of Extension of Public Comment Period for the Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada September 26, 2011 EA-1792: Finding of No Significant Impact University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine September 26, 2011 EA-1792: Final Environmental Assessment University of Maine's DeepWater Offshore Floating Wind Turbine Testing and

280

The ARM Atmospheric Emitted Radiance Interferometer (AERI): Status and  

NLE Websites -- All DOE Office Websites (Extended Search)

The ARM Atmospheric Emitted Radiance Interferometer (AERI): Status and The ARM Atmospheric Emitted Radiance Interferometer (AERI): Status and Preliminary Assessments of Instrument Deployments in 2006 Dedecker, Ralph University of Wisconsin Demirgian, Jack Argonne National Laboratory Knuteson, Robert University Of Wisconsin Revercomb, Henry University of Wisconsin-Madison Tobin, David University of Wisconsin-Madison Turner, David University of Wisconsin-Madison Category: Instruments One of the key operational instruments at the Atmospheric Radiation Measurement Climate Research Facility (ACRF) is the Atmospheric Emitted Radiance Interferometer (AERI). This instrument provides the ARM program with surface-based observations of infrared spectrally resolved radiance from a vertically directed cone with better than 1% accuracy. The data from

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR  

NLE Websites -- All DOE Office Websites (Extended Search)

ITEM NO. ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR 2 2 CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF OAK RIDGE ASSOCIATED UNIVERSITIES, INC. (A) (B) (C) (D) (E) (F) DE-AC05-06OR23100/0456 Payment: OR for Oak Ridge/OSTI U.S. Department of Energy Oak Ridge Office Oak Ridge Financial Service Center P.O. Box 6017 Oak Ridge TN 37831 Period of Performance: 01/01/2006 to 12/31/2015 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86) Sponsored by GSA FAR (48 CFR) 53.110 ___________ (x) x DE-AC05-06OR23100 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

282

Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance  

Science Journals Connector (OSTI)

Modeling the lead-time demand for the multiple slow-moving inventory items in the case when the available requests history is very short is a challenge for inventory management. The classical forecasting technique, which is based on the aggregation of the stock keeping units to overcome the mentioned historical data peculiarity, is known to lead to very poor performance in many cases important for industrial applications. An alternative approach to the demand forecasting for the considered problem is based on the Bayesian paradigm, when the initially developed population-averaged demand probability distribution is modified for each item using its specific requests history. This paper follows this approach and presents a new model, which relies on the beta distribution as a prior for the request probability, and allows to account for disparity in variance of demand between different stock keeping units. To estimate the model parameters, a special computationally effective technique based on the generalized method of moments is developed. Simulation results indicate the superiority of the proposed model over the known ones, while the computational burden does not increase.

Alexandre Dolgui; Maksim Pashkevich

2008-01-01T23:59:59.000Z

283

(sanitary) landfill operator  

Science Journals Connector (OSTI)

(sanitary) landfill operator, Mllkippenbetreiber m, Mlldeponiebetreiber, Kippenbetreiber, Deponiebetreiber

2014-08-01T23:59:59.000Z

284

Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Department of Energy Identity, Credential, and Access Management (ICAM) Cyber Security Training Conference Tuesday, May 18, 2010 Office of the Chief Information Officer 2 Announcement * LACS Birds-of-a-Feather Session - Logistics * Wednesday, May 19, 2010 * 9:30 AM - 11:30 AM EST * Room A708 - Focus: LACS ONLY! * LACS implementation experiences, lessons, questions, challenges, etc - Everyone is welcome * Science Identity Federation (Risk Management Track) - Logistics * Tuesday, May 18, 2010 * 4:00 PM - 5:00 PM EST * Room A704 - Focus * Ties into NSF/NIH InCommon Federation * Federated identity solution for Level 1 authentication Office of the Chief Information Officer 3 Slight Change of Focus Credential Issuance Facility Office of the Chief Information Officer 4 Paradigm Shift

285

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Finalized 030310 002 030210 030210 Direct Requesting copies of Consultation and cooperative Agreement between the Department of Energy and the State of New Mexico with...

286

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

9 FOIA - Request Log 9 FOIA - Request Log 1 Closed/ Date No. Dated Date Rec'd HQ or Dir. Subject Finalized 05/19/09 001 04/07/09 04/07/09 Direct Current contracts with Visionary Solutions, LLC and CAST Specialty Transportation Incorporated, for transportation services for the Waste Isolation Pilot Plant (WIPP) Finalized 06/30/09 002 06/29/09 06/29/09 Transfer DOE/HQ (1) All documents dated from February 2001 to the present relating or referring to any labor disputes that have delayed completion of federal construction projects costing $25 million or more during the time period referenced above. (2) All documents dated from February 2001 to the present relating or referring to any difficulties asserted by contractors in predicting labor cost and/or interruptions

287

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

288

Hermitian Young operators  

SciTech Connect

Starting from conventional Young operators, we construct Hermitian operators which project orthogonally onto irreducible representations of the (special) unitary group.

Keppeler, Stefan, E-mail: stefan.keppeler@uni-tuebingen.de [Mathematisches Institut, Universitt Tbingen, Auf der Morgenstelle 10, 72076 Tbingen (Germany)] [Mathematisches Institut, Universitt Tbingen, Auf der Morgenstelle 10, 72076 Tbingen (Germany); Sjdahl, Malin, E-mail: malin.sjodahl@thep.lu.se [Department of Astronomy and Theoretical Physics, Lund University, Slvegatan 14A, 22362 Lund (Sweden)] [Department of Astronomy and Theoretical Physics, Lund University, Slvegatan 14A, 22362 Lund (Sweden)

2014-02-15T23:59:59.000Z

289

Continuity of Operations Plan (COOP)  

NLE Websites -- All DOE Office Websites (Extended Search)

You are here: DOE-ID Home > COOP Continuity of Operations Plan (COOP) Call-In Number: 1-208-526-COOP (2667) or 1-877-DOE-DOE1 (1-877-363-3631) Wait for recording to start then Dial 382: If you are directed or forced to evacuate your current location to an alternate site, please contact us as soon as possible to advise us that you are safe and with a means of contacting you. This toll free or local number can be used by employees or their families to report their whereabouts or the whereabouts of another DOE-ID employee. Email Check-In: In addition to the call-in number, employees and families can report their status via a email check-in system. To access the email please click here. The email based check in system should only be used by DOE ID Employees.

290

DOE Workshop - Deposition Velocity Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivering DOE's Vision for the Delivering DOE's Vision for the East Tennessee Technology Park Mission Safely Delivering the Department of Energy's Vision for the East Tennessee Technology Park Mission DOE Workshop Deposition Velocity Status Mike Hitchler, Manager Nuclear Facility Safety June 5, 2012 Safely Delivering DOE's Vision for the East Tennessee Technology Park Mission Existing UCOR Analyses * UCOR facilities at East Tennessee Technology Park (ETTP) and Oak Ridge National Laboratory (ORNL) use various plume models depending on when they were developed and by whom. - Some use MACCS or MACCS2 for dispersion evaluation. (~5 locations) - LLLW uses ingestion modeling (multiple locations)

291

Status of Charm Flavor Physics  

E-Print Network (OSTI)

The role of charm in testing the Standard Model description of quark mixing and CP violation through measurements of lifetimes, decay constants and semileptonic form factors is reviewed. Together with Lattice QCD, charm has the potential this decade to maximize the sensitivity of the entire flavor physics program to new physics. and pave the way for understanding physics beyond the Standard Model at the LHC in the coming decade. The status of indirect searches for physics beyond the Standard Model through charm mixing, CP-violation and rare decays is also reported.

I. Shipsey

2006-07-26T23:59:59.000Z

292

Status of the GRANIT facility  

E-Print Network (OSTI)

The GRANIT facility is a follow-up project, which is motivated by the recent discovery of gravitational quantum states of ultracold neutrons. The goal of the project is to approach the ultimate accuracy in measuring parameters of such quantum states and also to apply this phenomenon and related experimental techniques to a broad range of applications in particle physics as well as in surface and nanoscience studies. We overview the current status of this facility, the recent test measurements and the nearest prospects.

Damien Roulier; Francis Vezzu; Stefan Baessler; Benot Clment; Daniel Morton; Valery Nesvizhevsky; Guillaume Pignol; Dominique Rebreyend

2014-10-06T23:59:59.000Z

293

Top Quark Current Experimental Status  

E-Print Network (OSTI)

Ten years after its discovery at the Tevatron collider, we still know little about the top quark. Its large mass suggests it may play a key role in the mechanism of Electroweak Symmetry Breaking (EWSB), or open a window of sensitivity to new physics related to EWSB and preferentially coupled to it. To determine whether this is the case, precision measurements of top quark properties are necessary. The high statistics samples being collected by the Tevatron experiments during Run II start to incisively probe the top quark sector. This report summarizes the experimental status of the top quark, focusing in particular on the recent measurements from the Tevatron.

A. Juste

2006-03-04T23:59:59.000Z

294

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

295

US RERTR Program: overview, status and plans  

SciTech Connect

The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

Travelli, A.

1984-01-01T23:59:59.000Z

296

Status of the LBNE Neutrino Beamline  

SciTech Connect

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the status of the conceptual design and the associated challenges.

Papadimitriou, Vaia; /Fermilab

2011-12-01T23:59:59.000Z

297

INTERNATIONAL UNION OF OPERATING ENGINEERS NATIONAL HAZMAT PROGRAM - HANDSS-55 TRANSURANIC WASTE REPACKAGING MODULE  

SciTech Connect

The Transuranic waste generated at the Savannah River Site from nuclear weapons research, development, and production is currently estimated to be over 10,000 cubic meters. Over half of this amount is stored in 55-gallon drums. The waste in drums is primarily job control waste and equipment generated as the result of routine maintenance performed on the plutonium processing operations. Over the years that the drums have been accumulating, the regulatory definitions of materials approved for disposal have changed. Consequently, many of the drums now contain items that are not approved for disposal at DOE Waste Isolation Pilot Plant (WIPP). The HANDSS-55 technology is being developed to allow remote sorting of the items in these drums and then repackaging of the compliant items for disposal at WIPP.

Unknown

2001-08-31T23:59:59.000Z

298

FACILITY REPRESENTATIVE PROGRAM STATUS, 6/21/1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACILITY REPRESENTATIVE PROGRAM STATUS, 6/21/1999 FACILITY REPRESENTATIVE PROGRAM STATUS, 6/21/1999 FACILITY REPRESENTATIVE PROGRAM STATUS, 6/21/1999 Since September, 1993, the Office of Field Management has served as the Department's corporate advocate for the Facility Representative Program. The Facility Representative (FR) is a critical technical position serving as line management's "eyes and ears" for operational safety in our contractor-operated facilities. I recognize the importance of the FR Program, and commit the Office of Field Integration (FI) to its continued crosscutting support. The FI staff continues to work with your staff members and with the Defense Nuclear Facilities Safety Board (Board) staff on FR Program issues, including staffing, training and qualification, recruitment, and retention. The Board is clearly interested in the

299

UESC Status Data Collection and Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the UESC status data collection and analysis, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

300

Current Status and Potential Future Developments for  

E-Print Network (OSTI)

in response to public concern about tropical deforestation and demand for an international woodCurrent Status and Potential Future Developments for Forest Certification Richard P. Vlosky

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Special Status Species | Open Energy Information  

Open Energy Info (EERE)

Species Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleSpecialStatusSpecies&oldid647804" Category: NEPA Resources...

302

Status of State Electric Industry Restructuring Activity  

Reports and Publications (EIA)

Presents an overview of the status of electric industry restructuring in each state. Restructuring means that a monopoly system of electric utilities has been replaced with competing sellers.

2010-01-01T23:59:59.000Z

303

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2010  

SciTech Connect

This status report, fourth in a series of annual status reports from the U.S. Department of Energy's National Renewable Energy Laboratory, summarizes progress and accomplishments from demonstrations of fuel cell transit buses in the United States. This year's assessment report provides the results from the fifth year of operation of five Van Hool, ISE, and UTC Power fuel cell buses operating at AC Transit, SunLine, and CTTRANSIT. The achievements and challenges of this bus design, implementation, and operating are presented, with a focus on the next steps for implementing larger numbers and new and different designs of fuel cell buses. The major positive result from nearly five years of operation is the dramatic increase in reliability experienced for the fuel cell power system.

Eudy, L.; Chandler, K.; Gigakis, C.

2010-11-01T23:59:59.000Z

304

Upgrade of CEBAF from 6 Gev To 12 Gev: Status  

SciTech Connect

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

2013-04-19T23:59:59.000Z

305

OFFICE OF CIVIL RIGHTS NA-1.2 VIDEO LIBRARY Item Title  

National Nuclear Security Administration (NNSA)

OFFICE OF CIVIL RIGHTS NA-1.2 OFFICE OF CIVIL RIGHTS NA-1.2 VIDEO LIBRARY Item # Title # of copies DVD / CD Length Year Publisher 1 A Clear Picture - Harassment in the Public Sector- Una Imagen Clara Acosoen el Sector Publico 1 DVD 2008 Coastal Training Technologies Corp. A Dupont Company 2 Harassment Hurts: It's Personal 1 DVD 16 min 2009 ATS Media 3 Harassment Is .. (government version) 1 DVD 21 min 2005 Coastal Training Technologies Corp. A Dupont Company 4 Harassment Made Simple 1 DVD 6 min 2011 TrainingABC 5 Harassment Training for Supervisors: Let's Face It. Capacitaci ón contra el Hostigamiento para Supervisores Enfrent émoslo 1 DVD 58 min 2007 Coastal Training Technologies Corp. A Dupont Company 6 It's UP to You: Stopping Sexual Harassment for Managers 1 DVD 27 min 2005 ATS Media 7 OpenLines: Exploring Harassment

306

Monticello NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items  

Office of Legacy Management (LM)

NPL Sites NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items Location Monticello, Utah- DOE Office of Legacy Management field office Date September 27,2006 Attendees David Bird- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Att Kleinrath- U.S. Depmtment of Energy Tim Bartlett- S. M. Stoller Meeting topics and discussion points are summarized separately under the headings that follow. Attaclunent 1 to this report includes the agenda and handout materials provided at the meeting. This report also includes disposal cell and Pond 4 leachate collection data (Attachment 2), quarterly site inspection results (Attachment 3), and project schedule and deliverables through the next two qumters (October 2006 through March 2007). With this

307

DOE-HDBK-1204-97; Guide to Good Practices for the Development of Test Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-97 4-97 January 1997 Supersedes DOE-STD-1009-92 July 1992 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR THE DEVELOPMENT OF TEST ITEMS U.S. Department of Energy FSC 6910 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE97000786 DOE-HDBK-1204-97 iii FOREWORD 1. This Department of Energy (DOE) Handbook is approved for use by all DOE

308

NMED COMMENTS ITEM 3 REVISE VOLATILE ORGANIC COMPOUND (VOC) TARGET ANALYTE LIST  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 NMED COMMENTS ITEM 3 REVISE VOLATILE ORGANIC COMPOUND (VOC) TARGET ANALYTE LIST OTHER CHANGES TO VOC MONITORING PROGRAM Page 1 of 21 VOC 3·1: PMR Section 3, Topic 1, Table 1 Recalculated Waste Matrix Code Group Weighting Factors based on the 2004 Compliance Recertification Contact Handled (CH) Transuranic (TRU) Waste Inventory (m 3 ) The new weighting factors appear to be based on CH TRU waste only and do not include remote handled (RH) TRU waste. There was no discussion in the PMR addressing possible differences in Waste Matrix Code Group (WMCG) for RH TRU that could potentially impact the weighting factors. Please provide data characterizing the differences in emissions between the two types of waste, in support of the assertion that modeling data from CH TRU waste adequately

309

The retailer multi-item inventory problem with demand cannibalization and substitution  

Science Journals Connector (OSTI)

Retailers of products with limited shelf life are faced with the dilemma of stocking the right mix of standard product and its customized stock keeping units, in each product category. In this paper we model the retailer multi-item inventory problem with demand cannibalization and substitution. The model focuses on the twin problems of optimal portfolio selection as well as optimal stocking under retailing context. Owing to analytical complexity in determining optimal solution, we develop heuristics for solving the problem. Using set of numerical examples we compare the heuristic solutions against the optimal solutions. In addition, we also attempt to understand the impact of important parameters on retailer profits through a series of sensitivity analysis.

Janat Shah; Balram Avittathur

2007-01-01T23:59:59.000Z

310

Implementing New Methods of Laser Marking of Items in the Nuclear Material Control and Accountability System at SSC RF-IPPE: An Automated Laser Marking System  

SciTech Connect

For over ten years SSC RF-IPPE, together with the US DOE National Laboratories, has been working on implementing automated control and accountability methods for nuclear materials and other items. Initial efforts to use adhesive bar codes or ones printed (painted) onto metal revealed that these methods were inconvenient and lacked durability under operational conditions. For NM disk applications in critical stands, there is the additional requirement that labels not affect the neutron characteristics of the critical assembly. This is particularly true for the many stainless-steel clad disks containing highly enriched uranium (HEU) and plutonium that are used at SSC RF-IPPE for modeling nuclear power reactors. In search of an alternate method for labeling these disks, we tested several technological options, including laser marking and two-dimensional codes. As a result, the method of laser coloring was chosen in combination with Data Matrix ECC200 symbology. To implement laser marking procedures for the HEU disks and meet all the nuclear material (NM) handling standards and rules, IPPE staff, with U.S. technical and financial support, implemented an automated laser marking system; there are also specially developed procedures for NM movements during laser marking. For the laser marking station, a Zenith 10F system by Telesis Technologies (10 watt Ytterbium Fiber Laser and Merlin software) is used. The presentation includes a flowchart for the automated system and a list of specially developed procedures with comments. Among other things, approaches are discussed for human-factor considerations. To date, markings have been applied to numerous steel-clad HEU disks, and the work continues. In the future this method is expected to be applied to other MC&A items.

Regoushevsky, V I; Tambovtsev, S D; Dvukhsherstnov, V G; Efimenko, V F; Ilyantsev, A I; Russ III, G P

2009-05-18T23:59:59.000Z

311

Propane vehicles : status, challenges, and opportunities.  

SciTech Connect

Propane as an auto fuel has a high octane value and has key properties required for spark-ignited internal combustion engines. To operate a vehicle on propane as either a dedicated fuel or bi-fuel (i.e., switching between gasoline and propane) vehicle, only a few modifications must be made to the engine. Until recently propane vehicles have commonly used a vapor pressure system that was somewhat similar to a carburetion system, wherein the propane would be vaporized and mixed with combustion air in the intake plenum of the engine. This leads to lower efficiency as more air, rather than fuel, is inducted into the cylinder for combustion (Myers 2009). A newer liquid injection system has become available that injects propane directly into the cylinder, resulting in no mixing penalty because air is not diluted with the gaseous fuel in the intake manifold. Use of a direct propane injection system will improve engine efficiency (Gupta 2009). Other systems include the sequential multi-port fuel injection system and a bi-fuel 'hybrid' sequential propane injection system. Carbureted systems remain in use but mostly for non-road applications. In the United States a closed-loop system is used in after-market conversions. This system incorporates an electronic sensor that provides constant feedback to the fuel controller to allow it to measure precisely the proper air/fuel ratio. A complete conversion system includes a fuel controller, pressure regulator valves, fuel injectors, electronics, fuel tank, and software. A slight power loss is expected in conversion to a vapor pressure system, but power can still be optimized with vehicle modifications of such items as the air/fuel mixture and compression ratios. Cold start issues are eliminated for vapor pressure systems since the air/fuel mixture is gaseous. In light-duty propane vehicles, the fuel tank is typically mounted in the trunk; for medium- and heavy-duty vans and trucks, the tank is located under the body of the vehicle. Propane tanks add weight to a vehicle and can slightly increase the consumption of fuel. On a gallon-to-gallon basis, the energy content of propane is 73% that of gasoline, thus requiring more propane fuel to travel an equivalent distance, even in an optimized engine (EERE 2009b).

Rood Werpy, M.; Burnham, A.; Bertram, K.; Energy Systems

2010-06-17T23:59:59.000Z

312

A unique radioisotopic label as a new concept for safeguarding and tagging of long-term stored items and waste  

E-Print Network (OSTI)

The present paper discuss a novel method of tagging and labeling of waste casks, copper canisters, spent fuel containers, mercury containers, waste pack- ages and other items. In particular, it is related to the development of new long-term security identification tags/labels that can be applied to articles for carrying information about the content, inventory tracking, prevention of falsifi- cation and theft etc. It is suggested to use a unique combination of radioisotopes with different predictable length of life, as a label of the items. The possibil- ity to realize a multidimensional bar code symbology is proposed as an option for a new labeling method. The results of the first tests and evaluations of this are shown and discussed in the paper. The invention is suitable for use in items assigned to long-term (hundreds of years) storing or for final repositories. Alternative field of use includes fresh nuclear fuel handling and shipment of goods.

Dina Chernikova; Kare Axell

2013-12-06T23:59:59.000Z

313

A unique radioisotopic label as a new concept for safeguarding and tagging of long-term stored items and waste  

E-Print Network (OSTI)

The present paper discuss a novel method of tagging and labeling of waste casks, copper canisters, spent fuel containers, mercury containers, waste pack- ages and other items. In particular, it is related to the development of new long-term security identification tags/labels that can be applied to articles for carrying information about the content, inventory tracking, prevention of falsifi- cation and theft etc. It is suggested to use a unique combination of radioisotopes with different predictable length of life, as a label of the items. The possibil- ity to realize a multidimensional bar code symbology is proposed as an option for a new labeling method. The results of the first tests and evaluations of this are shown and discussed in the paper. The invention is suitable for use in items assigned to long-term (hundreds of years) storing or for final repositories. Alternative field of use includes fresh nuclear fuel handling and shipment of goods.

Dina Chernikova; Kare Axell

2015-01-15T23:59:59.000Z

314

110 kW Stationary Combined Heat and Power Systems Status and  

E-Print Network (OSTI)

the status of 1­10 kW CHP stationary fuel cell systems and to comment on the achievability of cost-temperature proton exchange membrane (LT-PEM) fuel cell systems operating, for the most part, in a temperature range of 60°­90°C; high temperature PEM (HT-PEM) fuel cell systems operating in a temperature range of 130

315

Nuclear safeguards research and development. Program status report, October 1980-January 1981  

SciTech Connect

This report presents the status of the Nuclear Safeguards Research and Development Program pursued by the Energy, Chemistry-Materials Science, and Operational Security/Safeguards Divisions of the Los Alamos National Laboratory. Topics include nondestructive assay technology development and applications, international safeguards systems. Also discussed are training courses, technology transfer, analytical chemistry methods for fissionable materials safeguards, the Department of Energy Computer Security Technical Center, and operational security.

Henry, C.N. (comp.)

1981-11-01T23:59:59.000Z

316

Windenergy technology and present status  

Science Journals Connector (OSTI)

Today there are various types of wind energy converters in operation, (Figure 1 gives an overview). The most common device is the horizontal axis wind energy converter. This converter consists of only a few ae...

Hermann-Josef Wagner

2001-01-01T23:59:59.000Z

317

PERFORMANCE STATUS OF THE RF-GUN BASED INJECTOR OF THE TESLA TEST FACILITY LINAC  

E-Print Network (OSTI)

PERFORMANCE STATUS OF THE RF-GUN BASED INJECTOR OF THE TESLA TEST FACILITY LINAC S. Schreiber. For this, an rf-gun based photoinjec- tor was installed late 1998 and is in operation since then gun [4] to match the beam charcteristics as close as pos- sible to the TESLA proposal. It is able

318

ENERGY-SPECIFIC SOLAR RADIATION DATA FROM MSG: CURRENT STATUS OF THE HELIOSAT-3 PROJECT  

E-Print Network (OSTI)

ENERGY-SPECIFIC SOLAR RADIATION DATA FROM MSG: CURRENT STATUS OF THE HELIOSAT-3 PROJECT Marion Solar energy technologies such as photovoltaics, solar thermal power plants, passive solar heating and operating of solar energy systems and as basis data set for electricity load forecasting. Both long term

Heinemann, Detlev

319

UCPath Project Status Report Report Date February 22, 2013 Project Director  

E-Print Network (OSTI)

1 UCPath Project Status Report Report Date February 22, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Scope Schedule Budget Resources for early March. The UCPath Center team is focused on development of internal operating procedures

Fainman, Yeshaiahu

320

2008 Status Report - Savings Estimates for the ENERGY STAR Voluntary  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Report - Savings Estimates for the ENERGY STAR Voluntary Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Title 2008 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Publication Type Journal Article LBNL Report Number LBNL-56380 Year of Publication 2007 Authors Sanchez, Marla C., Carrie A. Webber, Richard E. Brown, and Gregory K. Homan Date Published 11/2007 Publisher Lawrence Berkeley National Laboratory ISBN Number LBNL-56380(2008) Keywords Enduse, Energy End-Use Forecasting, EUF Abstract ENERGY STAR is a voluntary labeling program designed to identify and promote energy-efficient products, buildings and practices. Operated jointly by the Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE), ENERGY STAR includes more than thirty products, spanning office equipment, residential heating and cooling equipment, commercial and residential lighting, home electronics, and major appliances. This report presents savings estimates for ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2007, what we expect in 2008, and provide savings forecasts for the periods 2008 to 2015 and 2008 to 2025. The forecast represents our best estimate of future ENERGY STAR savings. It is based on realistic ENERGY STAR unit sales for each of the products.

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)  

SciTech Connect

This fact sheet describes National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth. Participating fuel cell developers share price information about their fuel cell products and/or raw fuel cell test data related to operations, maintenance, and safety with NREL via the Hydrogen Secure Data Center (HSDC). The limited-access, off-network HSDC houses the data and analysis tools to protect proprietary information. NREL shares individualized data analysis results as detailed data products (DDPs) with the partners who supplied the data. Aggregated results are published as composite data products (CDPs), which show the technology status without identifying individual companies. The CDPs are a primary benchmarking tool for the U.S. Department of Energy and other stakeholders interested in tracking the status of fuel cell technologies. They highlight durability advancements, identify areas for continued development, and help set realistic price expectations at small-volume production.

Not Available

2013-06-01T23:59:59.000Z

322

HEALTH STATUS VIETNAM VETERAI~S  

E-Print Network (OSTI)

of the data. In this supplement we focus prirnarily on three potential sources of error: observer (physician specimens were recorded on video tape. For selected items in each medical examination, we analyzed into the analyses of cohort differences for any of the medical or psychological outcomes evaluated. The reliability

323

JLF Conduct of Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Jupiter Laser Facility (JLF) Conduct Of Operations The Conduct of Operations is a set of procedures and guidelines that are put in place to ensure operational safety and security...

324

Heat Transfer Operators Associated with Quantum Operations  

E-Print Network (OSTI)

Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

. Aksak; S. Turgut

2011-04-14T23:59:59.000Z

325

RenewableS 2011 GLOBAL STATUS REPORT  

E-Print Network (OSTI)

__20112011 RenewableS 2011 GLOBAL STATUS REPORT Full Report at: http://www.ren21.net/Portals/97/documents/GSR/REN21_GSR2011.pdf #12;11 Changes in renewable energy markets, investments, industries, and policies have been so rapid in recent years that perceptions of the status of renewable energy can lag

Kostic, Milivoje M.

326

Green Sturgeon (Acipenser medirostris) Status Review Update  

E-Print Network (OSTI)

Green Sturgeon (Acipenser medirostris) Status Review Update Biological Review Team Santa Cruz Status of Green Sturgeon 1 3. Key Questions in ESA Determination 3 a. The "Species" Question 3 b. The Extinction Risk Question 4 c. "A significant portion of the species' range" issue 4 Recently Updated Green

327

Status of (US) high energy physics networking  

Science Journals Connector (OSTI)

The current status of networking to and between computers used by the high energy physics community is discussed. Particular attention is given to developments over the last year and to future prospects. Comparison between the current status and that of two years ago indicates that considerable strides have been made but that much remains to be done to achieve an acceptable level of functionality.

H.E. Montgomery

1987-01-01T23:59:59.000Z

328

Status of (US) High Energy Physics Networking  

SciTech Connect

The current status of Networking to and between computers used by the High Energy Physics community is discussed. Particular attention is given to developments over the last year and to future prospects. Comparison between the current status and that of two years ago indicates that considerable strides have been made but that much remains to be done to achieve an acceptable level of functionality.

Montgomery, H.E.

1987-02-01T23:59:59.000Z

329

11. THIS ITEM APPLIES TO AMENDMENTS OF SOLICITATIONS D The above numbered solicitationis amended as set forth in Item 14. The hour and dale specified for receipt of Offers 0 is extended. D is not extended.  

E-Print Network (OSTI)

(REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT as provided herein. at!tenns and conditions of the document referenced in Item 9Aor 10A.as heretofore changed Division Richland, Benton County, WA 99352 10A.MODIFICATIONOFCONTRACTIORDERNO. DE-ACO76RL01830 DUNS

330

Property:FacilityStatus | Open Energy Information  

Open Energy Info (EERE)

FacilityStatus FacilityStatus Jump to: navigation, search Property Name FacilityStatus Property Type String Description Status of the energy generation facility Allows Values Proposed;Under Construction;In Service;Decommissioned Pages using the property "FacilityStatus" Showing 25 pages using this property. (previous 25) (next 25) 3 3-D Metals + In Service + A AB Tehachapi Wind Farm + In Service + AFCEE MMR Turbines + In Service + AG Land 1 + In Service + AG Land 2 + In Service + AG Land 3 + In Service + AG Land 4 + In Service + AG Land 5 + In Service + AG Land 6 + In Service + AVTEC + In Service + Adair Wind Farm I + In Service + Adair Wind Farm II + In Service + Adams Wind Project + In Service + Aegir II + Proposed + Aero Turbine + In Service + Aeroman Repower Wind Farm + In Service +

332

June 21, 1999 Memo, Facility Representative Program Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June June 21, 1999 MEMORANDUM FOR: Assistant Secretary for Defense Programs Assistant Secretary for Environmental Management Director, Office of Science Director, Office of Nuclear Energy, Science and Technology FROM: John Wilcynski, Director, Office of Field Integration SUBJECT: FACILITY REPRESENTATIVE PROGRAM STATUS Since September, 1993, the Office of Field Management has served as the Department's corporate advocate for the Facility Representative Program. The Facility Representative (FR) is a critical technical position serving as line management's "eyes and ears" for operational safety in our contractor-operated facilities. I recognize the importance of the FR Program, and commit the Office of Field Integration (FI) to its continued crosscutting support. The FI staff continues to work with your staff members and with the Defense Nuclear Facilities

333

Pressurized Items and Cryogens Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pressurized Systems and Cryogens Pressurized Systems and Cryogens Performance Objective: Assure personnel health and safety through regularly scheduled inspections and maintenance on pressure vessels and equipment, compressed gases and gas cylinders, vacuum equipment and systems, hydraulics, and cryogenic materials and systems. Performance Criteria: BN inspects, operates and safely stores unmodified compressed-gas or liquid cylinders approved by the Department of Transportation (DOT) and the appropriate regulators. BN inspects, operates and maintains refrigeration systems that comply with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Codes, and applicable Air Conditioning and Refrigeration Institute (ARI) standards. BN inspects, operates and maintains pressure systems that operate at an

334

Partnership status and the human sex ratio at birth  

Science Journals Connector (OSTI)

...information about the parent's household status before the child's...parent's marital status, household type, ethnicity, age and...grade completed, black and Hispanic ethnicity, dummy variables...analysis. The coefficient for household status is therefore interpretable...

2004-01-01T23:59:59.000Z

335

http://www.uab.edu/news/latest/item/3610-new-study-says-exercise-can-reduce-stroke-risk  

E-Print Network (OSTI)

http://www.uab.edu/news/latest/item/3610-new-study-says- exercise-can-reduce-stroke-risk http- lationship between exercise and stroke in a large biracial group of men and women in the United States. A total of 27,000 stroke- free blacks and whites ages 45 and older participated in the study. The results

Alpay, S. Pamir

336

Item #3 RMP Study # 1 Page 1 of 5 SS Dioxins in sport fish, bird eggs, surface sediments and tributaries  

E-Print Network (OSTI)

Item #3 RMP Study # 1 Page 1 of 5 SS Dioxins in sport fish, bird eggs, surface sediments and tributaries PS/SS: 2012 Dioxins Studies: Sport Fish, Bird Eggs, Surface Sediment, and Tributary Waters Estimated Cost: $119,470 Oversight Group: Dioxin Strategy Work Group Proposed by: Susan Klosterhaus and Don

337

Mission Operations & Data Systems  

E-Print Network (OSTI)

Mission Operations & Data Systems The LASP Mission Operations & Data Systems (MO&DS) group staffs and instruments. Operational software acts like the health systems in a body, ensuring that temperature, energy. The software monitors the health of on-board systems; anything unusual is flagged and sent to mission operators

Mojzsis, Stephen J.

338

ARM - SGP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements with the highest priority, on which the existing experimental designs are based, are regular routine observations, as specified in the ARM Program Plan, 1990 (U.S. Department of Energy 1990). Scientifically and logistically, routine operations also serve as the basis and background for all nonroutine operations, including

339

Intermediate Ethanol Blends: Plans and Status | Department of...  

Energy Savers (EERE)

Intermediate Ethanol Blends: Plans and Status Intermediate Ethanol Blends: Plans and Status Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review 2008...

340

Status and Progress in Research, Development and Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Status and Progress in Research, Development and Demonstration of Hydrogen-Compressed Natural Gas Vehicles in China Status and Progress in Research, Development and Demonstration...

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

342

Goal Practice & Experience : Status Quo and Future for Industrial...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Goal Practice & Experience : Status Quo and Future for Industrial Scale Biomass Energy Development in China Goal Practice & Experience : Status Quo and Future for Industrial Scale...

343

Fuel Quality and Metering: Current Status and Future Needs |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Quality and Metering: Current Status and Future Needs Fuel Quality and Metering: Current Status and Future Needs These slides were presented at the Onboard Storage Tank...

344

Status Update: Extended Storage and Transportation Waste Confidence...  

Office of Environmental Management (EM)

Status Update: Extended Storage and Transportation Waste Confidence Status Update: Extended Storage and Transportation Waste Confidence Presentation made by David W. Pstrak for the...

345

Status Prospects of Green Data Center | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Prospects of Green Data Center Status Prospects of Green Data Center Information on energy-saving technology research of green data centers and the potential impacts....

346

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant...

347

Status Report, Department of Energy - March 2006 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Department of Energy - March 2006 March 2006 Report on Safety System Engineer and Oversight Programs This report provides a status of the implementation of safety...

348

Opening Statement by NNSA Administrator D'Agostino on the Current Status  

National Nuclear Security Administration (NNSA)

Current Status Current Status and Future Direction for U.S. Nuclear Weapons Policy and Posture Before The Subcommittee on Strategic Forces House Armed Services Committee | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > Opening Statement by NNSA Administrator D'Agostino on ...

349

Opening Statement by NNSA Administrator D'Agostino on the Current Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Status Current Status and Future Direction for U.S. Nuclear Weapons Policy and Posture Before The Subcommittee on Strategic Forces House Armed Services Committee | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > Opening Statement by NNSA Administrator D'Agostino on ...

350

WIPP Marks 12 Years of Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks 12 Years of Operations Marks 12 Years of Operations WIPP Marks 12 Years of Operations March 28, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has now been 12 years since WIPP received its first shipment of transuranic (TRU) waste. TRU waste consists of clothing, tools, rags, debris, residues and other disposal items contaminated with radioactive elements - mostly plutonium. "WIPP employees and members of the community cheered when the first shipment of TRU waste arrived here in 1999," said Acting Carlsbad Field Office Manager Ed Ziemianski. "I applaud their continued dedication to our nation, which has placed its trust in WIPP to maintain those rigorous

351

Critical Protection Item classification for a waste processing facility at Savannah River Site  

SciTech Connect

This paper describes the methodology for Critical Protection Item (CPI) classification and its application to the Structures, Systems and Components (SSC) of a waste processing facility at the Savannah River Site (SRS). The WSRC methodology for CPI classification includes the evaluation of the radiological and non-radiological consequences resulting from postulated accidents at the waste processing facility and comparison of these consequences with allowable limits. The types of accidents considered include explosions and fire in the facility and postulated accidents due to natural phenomena, including earthquakes, tornadoes, and high velocity straight winds. The radiological analysis results indicate that CPIs are not required at the waste processing facility to mitigate the consequences of radiological release. The non-radiological analysis, however, shows that the Waste Storage Tank (WST) and the dike spill containment structures around the formic acid tanks in the cold chemical feed area and waste treatment area of the facility should be identified as CPIs. Accident mitigation options are provided and discussed.

Ades, M.J. [Westinghouse Savannah River Co., Aiken, SC (United States); Garrett, R.J. [ABB Government Services, Aiken, SC (United States)

1993-10-01T23:59:59.000Z

352

PEM Stack Manufacturing: Industry Status  

NLE Websites -- All DOE Office Websites (Extended Search)

© 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED © 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED JULY 2009 B U I L D I N G A C L E A N E N E R G Y G R O W T H C O M P A N Y B A L L A R D P O W E R S Y S T E M S PEM Stack Manufacturing: Industry Status Duarte R. Sousa, PE August 11, 2011 AUGUST 2009 P A G E 2 Overview of PEM Stack Manufacturing MEA Manufacturing Plate Manufacturing Stack Assembly Stack Conditioning and Testing Package and Ship For each of the four main processes, the following will be provided: 1. A brief history of where we have been; 2. Where we are today; 3. Where we would like to transition to; 4. Gaps and proposals. AUGUST 2009 P A G E 3 PEM Stack Manufacturing: Cost Overview * The MEA was readily identified as the major cost driver in a 10 kW stationary stack. * The precious metal catalyst electrode is the major cost driver for the MEA.

353

EVOLUTIONARY STATUS OF 85 PEGASI  

SciTech Connect

We have investigated the evolutionary status of the visual binary 85 Peg (HD 224930) using a high-resolution spectroscopic analysis and the astrometric calibration of the stellar parameters. In spite of well-determined stellar parameters from HIPPARCOS astrometry and from spectroscopy, 85 Peg has for a long time revealed peculiar properties when attempts have been made to combine an evolutionary model with observation. There has been a chronic problem of the mass ratio of the two components when comparing 85 Peg's dynamical properties to the photometric magnitude difference. Moreover, 85 Peg has been suspected to have unique characteristics in its chemical composition. In order to determine accurate spectroscopic abundances, we have obtained high-resolution echelle spectra for 85 Peg. From our elemental analysis, we found that 85 Peg is alpha-enhanced with respect to the scaled solar abundance by a factor of 2. We then produced, within the framework of the standard stellar theory, grids of stellar model using the most recent observational results. To avoid many-fold degeneracy among physical quantities, a statistical minimization test was carried out between theoretical model grids. Enforcing consistency between the modeling and statistical constraints, we derived a reliable set of physical parameters and confirmed the trinarity of the system. In the context of asteroseismology, the theoretical frequency spectrum of 85 Peg was calculated. 85 Peg A is expected to have a first order spacing {Delta}{nu} {approx} 165 {mu}Hz at the reference frequency {nu}{sub 0} = 790 {mu}Hz.

Bach, K.; Kim, Y.-C. [Department of Astronomy, Yonsei University, Seoul 120-749 (Korea, Republic of); Lee, J. [The Astrophysical Research Center for the Structure and Evolution of the Cosmos, Sejong University, Seoul 143-747 (Korea, Republic of); Demarque, P., E-mail: khbach@galaxy.yonsei.ac.k, E-mail: yckim@yonsei.ac.k, E-mail: jdlee.selab@gmail.co, E-mail: pierre.demarque@yale.ed [Department of Astronomy, Yale University, P.O. Box 208101, New Haven, CT 06520-8101 (United States)

2009-09-20T23:59:59.000Z

354

Status of fission yield evaluations  

SciTech Connect

Very few yield compilations are also evaluations, and very few contain an extensive global library of measured data and extensive models for unmeasured data. The earlier U.K. evaluations and US evaluations were comparable up to the retirements of the primary evaluators. Only the effort in the US has been continued and expanded. The previous U.K. evaluations have been published. In this paper we summarize the current status of the US evaluation, philosophy, and various integral yield tests for 34 fissioning nuclides at one or more neutron incident energies and/or for spontaneous fission. Currently there are 50 yield sets and for each we have independent and cumulative yields and uncertainties for approximately 1100 fission products. When finalized, the recommended data will become part of the next version of the US Evaluated Nuclear Data File (ENDF/B-VI). The complete set of data, including the basic input of measured yields, will be issued as a sequel to the General Electric evaluation reports (better known by the authors' names: Rider - or earlier - Meek and Rider). 16 references.

England, T.R.; Rider, B.F.

1983-01-01T23:59:59.000Z

355

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME...  

National Nuclear Security Administration (NNSA)

e-mail msg dtd 05232011 ORO O 350, Ch. III Deletion: This Policy was cancelled by DOE Oak Ridge Operations and is no longer needed in the B&W Y-12 Baseline List of Required...

356

KCP installs steel cable mesh that can stop a 20 pound item traveling...  

National Nuclear Security Administration (NNSA)

by January 2013. Nearly half the size of our existing facility, the new, state-of-the-art green facility will reduce annual operating costs by 100 million and cut energy...

357

Item#2: MYP Meeting Summary Page 1 of 6 RMP Multi-Year Planning Workshop  

E-Print Network (OSTI)

Authority) Peter Carroll, Refineries (Tesoro Golden Eagle Refinery) Amy Chastain (AECOM/SFPUC) David operations. Tom then reviewed the timeline for the TMDLs. The North Bay Selenium TMDL is on track

358

MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991  

SciTech Connect

This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

Not Available

1993-02-01T23:59:59.000Z

359

Class of 2007 Career Status Survey  

E-Print Network (OSTI)

..................................................24-26 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

360

Class of 2009 Career Status Survey  

E-Print Network (OSTI)

..................................................22-24 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Class of 2010 Career Status Survey  

E-Print Network (OSTI)

..................................................23-25 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

362

Class of 2008 Career Status Survey  

E-Print Network (OSTI)

..................................................22-24 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

363

UNIT NAME : KOW STANDPIPE REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

093 UNIT NUMBER: 182 Pg 1 of 2 UNIT NAME : KOW STANDPIPE REGULATORY STATUS: AOC LOCATION: Outside plant security fence, southwest of C-611. 3 feet high by 3 feet in diameter....

364

Requirements & Status for Volume Fuel Cell Manufacturing  

E-Print Network (OSTI)

Requirements & Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July ­Eliminate components, parts and process steps ­Standardize core components across products ­Standardize non-core

365

PKIX Certificate Status in Hybrid MANETs  

Science Journals Connector (OSTI)

Certificate status validation is a hard problem in general but it is particularly complex in Mobile Ad-hoc Networks (MANETs) because we require solutions to manage both the lack of fixed infrastructure inside the...

Jose L. Muoz; Oscar Esparza; Carlos Gan

2009-01-01T23:59:59.000Z

366

National Hydrogen Learning Demonstration Status (Presentation)  

SciTech Connect

This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-02-01T23:59:59.000Z

367

The Status of Solar Thermal Electric Technology  

Science Journals Connector (OSTI)

Solar thermal electric technology was evaluated as a future source of power for United States utilities. The technology status was developed using an ... configuration was selected for each of the major solar col...

Richard J. Holl; Edgar A. DeMeo

1990-01-01T23:59:59.000Z

368

Status of the MAJORANA DEMONSTRATOR experiment  

SciTech Connect

The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

Martin, R. D. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA, USA and Department of Physics, University of South Dakota, Vermillion, SD (United States); Abgrall, N.; Chan, Y-D.; Hegai, A.; Mertens, S.; Poon, A. W. P.; Vetter, K. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Aguayo, E.; Fast, J. E.; Hoppe, E. W.; Kouzes, R. T.; LaFerriere, B. D.; Orrell, J. L.; Overman, N. R.; Soin, A. [Pacific Northwest National Laboratory, Richland, WA (United States); Avignone III, F. T. [Department of Physics and Astronomy, University of South Carolina, Columbia, SC, USA and Oak Ridge National Laboratory, Oak Ridge, TN (United States); Barabash, A. S.; Konovalov, S. I.; Yumatov, V. [Institute for Theoretical and Experimental Physics, Moscow (Russian Federation); Bertrand, F. E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); and others

2014-06-24T23:59:59.000Z

369

CESA-1 Heliostat Field Evaluation Status Report  

Science Journals Connector (OSTI)

This paper describes the status of the evaluation activities of the CESA-1 Heliostat Field. The Heliostat field is composed of three hundred heliostats of two different types (CASA-II and...

Fernando Snchez

1985-01-01T23:59:59.000Z

370

Chemistry of nuclear fuel reprocessing: Current status  

Science Journals Connector (OSTI)

Current status on the chemical aspects of nuclear fuel reprocessing is presented with special emphasis on the Purex process which continues to be the process of choice for the last four decades. Better deconta...

D. D. Sood; S. K. Patil

1996-03-01T23:59:59.000Z

371

Status of Heavy-lepton Searches  

DOE R&D Accomplishments (OSTI)

Searches for heavy leptons using e{sup +}e{sup -} annihilation, lepton-hadron collisions, photon-hadron collisions, hadron-hadron collisions, and studies of macroscopic matter are reviewed. The present experimental status and future possibilities are summarized.

Perl, M. L.

1981-06-00T23:59:59.000Z

372

Structure formation: Models, Dynamics and Status  

E-Print Network (OSTI)

The constraints on the models for the structure formation arising from various cosmological observations at different length scales are reviewed. The status of different models for structure formation is examined critically in the light of these observations.

T. Padmanabhan

1995-08-25T23:59:59.000Z

373

CANDU safety-status and direction  

SciTech Connect

This paper reviews the status and direction of Canada deuterium uranium (CANDU) safety design for the current CANDU product line, with emphasis on the single-unit containment plants.

Snell, V.G.; Allen, P.J. (Atomic Energy of Canada Limited, Sheridan Park (Canada))

1993-01-01T23:59:59.000Z

374

status of the latest research and development  

NLE Websites -- All DOE Office Websites (Extended Search)

status of the latest research and development (R&D) activities. In status of the latest research and development (R&D) activities. In addition, the website, which is accessible from the NETL homepage, contains updated material on the program's Core R&D, Infrastructure, and Global Collaborations elements; a modified Frequently Asked Questions (FAQ) section; a section highlighting the National Carbon Sequestration Database and Geographic Information System

375

HVAC Commissioning - A Status Report in Taiwan  

E-Print Network (OSTI)

HVAC HVAC CommisioningCommisioning ?? A Status Report in TaiwanA Status Report in Taiwan Dr. K.H. YangDr. K.H. Yang Fellow ASHRAEFellow ASHRAEProfessor, National Sun Professor, National Sun Yat... ,decided to conduct an overall renovation program for the HVAC systems of existing governmental buildings where it is mandatory to adapt BEMS and conducting system commissioning .?This program not only constructs an important step in responding...

Yang, K. H.

2006-01-01T23:59:59.000Z

376

Solar Neutrinos: Status and Prospects  

E-Print Network (OSTI)

We describe the current status of solar neutrino measurements and of the theory -- both neutrino physics and solar astrophysics -- employed in interpreting measurements. Important recent developments include Super-Kamiokande's determination of the neutrino-electron elastic scattering rate for 8B neutrinos to 3%; the latest SNO global analysis in which the inclusion of low-energy data from SNO I and II significantly narrowed the range of allowed values for the neutrino mixing angle theta12; Borexino results for both the 7Be and pep neutrino fluxes, the first direct measurements constraining the rate of ppI and ppII burning in the Sun; global reanalyses of solar neutrino data that take into account new reactor results on theta13; a new decadal evaluation of the nuclear physics of the pp chain and CNO cycle defining best values and uncertainties in the nuclear microphysics input to solar models; recognition of an emerging discrepancy between two tests of solar metallicity, helioseismological mappings of the sound speed in the solar interior, and analyses of the metal photoabsorption lines based on our best current description of the Sun's photosphere; a new round of standard solar model calculations optimized to agree either with helioseismology or with the new photospheric analysis; and, motivated by the solar abundance problem, the development of nonstandard, accreting solar models, in order to investigate possible consequences of the metal segregation that occurred in the proto-solar disk. We review this progress and describe how new experiments such as SNO+ could help us further exploit neutrinos as a unique probe of stellar interiors.

W. C. Haxton; R. G. Hamish Robertson; Aldo M. Serenelli

2012-08-28T23:59:59.000Z

377

Status and Trends in U.S. Compliance and Voluntary Renewable Energy Certificate Markets (2010 Data)  

NLE Websites -- All DOE Office Websites (Extended Search)

Status and Trends in U.S. Status and Trends in U.S. Compliance and Voluntary Renewable Energy Certificate Markets (2010 Data) Jenny Heeter and Lori Bird Technical Report NREL/TP-6A20-52925 October 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Status and Trends in U.S. Compliance and Voluntary Renewable Energy Certificate Markets (2010 Data) Jenny Heeter and Lori Bird Prepared under Task No. SAO9.3110 Technical Report NREL/TP-6A20-52925 October 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

378

Status and Trends in the U.S. Voluntary Green Power Market (2012 Data)  

NLE Websites -- All DOE Office Websites (Extended Search)

Status and Trends in the U.S. Status and Trends in the U.S. Voluntary Green Power Market (2012 Data) J. Heeter and T. Nicholas National Renewable Energy Laboratory Technical Report NREL/TP-6A20-60210 October 2013 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 303-275-3000 * www.nrel.gov Status and Trends in the U.S. Voluntary Green Power Market (2012 Data) J. Heeter and T. Nicholas National Renewable Energy Laboratory

379

DOE 2010 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012)  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012) 10 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012) Page 1 of 3 2010 HSS Directives Disposition Status Secretary of Energy Notice SEN-35-91, Nuclear Safety Policy Revise Complete - see Policy 420.1. Order 5400.5, Radiation Protection of the Public and the Environment Revise Complete - see Order 458.1. Order 5480.19, Conduct of Operations Requirements for DOE Facilities Revise Complete - see Order 422.1. Order 5480.20A, Personnel Selection, Training, Qualification, and Certification Requirements Revise Complete - see Order 426.2. Order 5480.30, Nuclear Reactor Design Criteria Re-certify Complete - re-certified. Manual 140.1-1B, Interface with the Defense Nuclear Facilities Safety Board Re-certify Complete - re-certified.

380

Market Brief: Status of the Voluntary Renewable Energy Certificate Market (2011 Data)  

NLE Websites -- All DOE Office Websites (Extended Search)

Market Brief: Status of the Market Brief: Status of the Voluntary Renewable Energy Certificate Market (2011 Data) Jenny Heeter, Philip Armstrong, and Lori Bird National Renewable Energy Laboratory Technical Report NREL/TP-6A20-56128 September 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Market Brief: Status of the Voluntary Renewable Energy Certificate Market (2011 Data) Jenny Heeter, Philip Armstrong, and Lori Bird National Renewable Energy Laboratory Prepared under Task Nos. SAO9.3110 and SA12 0324

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

July 2010, Status and Outlook for Nuclear Energy In the United States |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2010, Status and Outlook for Nuclear Energy In the United July 2010, Status and Outlook for Nuclear Energy In the United States July 2010, Status and Outlook for Nuclear Energy In the United States The U.S. nuclear power industry continues to make pro- gress toward the construction of new nuclear power plants in the United States. Currently, 13 license applica- tions are under active review by the Nuclear Regulatory Commission (NRC) for up to 22 new reactors. The De- partment of Energy has awarded conditional commit- ments for loan guarantees to the partners in the Vogtle project and is negotiating terms for loan guarantees with several new nuclear projects. The 104 operating plants continue to perform well, turn- ing in sustained performance for output and capacity factor - an estimated 798.7 billion kilowatt-hours and 90.5 percent respectively in 2009.

382

CONDUCT OF OPERATIONS (CO)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONDUCT OF OPERATIONS (CO) CONDUCT OF OPERATIONS (CO) OBJECTIVE TA-55 SST Facility NNSA ORR Implementation Plan 1 1 CO.1 The formality and discipline of operations is adequate to conduct work safely and programs are inplace to maintain this formality and discipline. (Core Requirement 13) Criteria 1. Programmatic elements of conduct of operations are in place for TA-55 SST operations. 2. The TA-55 SST operations personnel adequately demonstrate the principles of conduct ofoperations requirements during the shift performance period. Approach Record Reviews: Review procedures and other facility documents to verify compliance with conduct of operations principles. Interviews: Interview a sampling of the TA-55 SST associated personnel to validate their understanding of the conduct of operations principles (e.g., procedure usage,

383

Transforming Commercial Building Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

384

Transforming Commercial Building Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

385

Quantum Operations and Measurement  

E-Print Network (OSTI)

the Stinespring dilation form of E . 6 #12; II: operator­sum representation E(#) = Tr env # U(## # env )U

Seevinck, Michiel

386

Challenge # 3 ? Operational Issues  

Energy.gov (U.S. Department of Energy (DOE))

Fernando Preto presentation on May 9, 2012, at the Pyrolysis Oil Workshop on Challenge #3 Operational Issues.

387

FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE))

List of Senior Technical Safety Manager Positions, Base Requirements, Compensatory Measures and Qualification Status.

388

Status and EAC Recommendations for Electricity Delivery Workforce (September 2014)  

Energy.gov (U.S. Department of Energy (DOE))

Status and recommendations presented at the September 2014 meeting for Electricity Delivery Workforce (September 2014)

389

Pantex Plant Operational Awareness Oversight, May 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PTX-2013-05-20 PTX-2013-05-20 Site: Pantex Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Pantex Plant Dates of Activity : 05/20/2013 - 05/23/2013 Report Preparer: William Macon Activity Description/Purpose: This Office of Health, Safety and Security (HSS) activity was an operational awareness site visit to discuss an upcoming July outage for replacing information systems, determine the status of the new High Explosives Pressing Facility (HEPF) under construction, review the master assessment schedule activities for the remainder of fiscal year 2013, and monitor other ongoing site activities. Result: 1. The site lead discussed the Integrated Production Planning and Execution System (IPRO) with the Babcock and Wilcox

390

Wireless Roadside Inspection Field Operations.pub  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Operational Test (FOT) Field Operational Test (FOT) Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Research Brief T he U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) has commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is hypothesized that

391

Pantex Operational Awareness Oversight, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR PTX-2012-11-08 Site: Pantex Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Pantex Plant Dates of Activity : 11/05/2012 - 11/08/2012 Report Preparer: William Macon Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was to perform an operational awareness site visit to review the status of the Babcock & Wilcox Technical Services Pantex, LLC (B&W Pantex) Documented Safety Analysis Upgrade Initiative (DSAUGI) project and B&W Pantex's response to various fire protection issues, and also to monitor other

392

Operations and maintenance philosophy  

SciTech Connect

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

393

Operating System Resource Management  

E-Print Network (OSTI)

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

394

2007 Status Report - Savings Estimates for the ENERGY STAR Voluntary  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Status Report - Savings Estimates for the ENERGY STAR Voluntary 7 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Title 2007 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Publication Type Journal Article LBNL Report Number LBNL-56380 Year of Publication 2007 Authors Sanchez, Marla C., Carrie A. Webber, Richard E. Brown, and Gregory K. Homan Pagination 38 Date Published 03/2007 Publisher Lawrence Berkeley National Laboratory ISBN Number LBNL-56380(2007) Keywords Enduse, Energy End-Use Forecasting, EUF Abstract ENERGY STAR® is a voluntary labeling program designed to identify and promote energy-efficient products, buildings and practices. Operated jointly by the Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE), ENERGY STAR labels exist for more than thirty products, spanning office equipment, residential heating and cooling equipment, commercial and residential lighting, home electronics, and major appliances. This report presents savings estimates for a subset of ENERGY STAR labeled products. We present estimates of the energy, dollar and carbon savings achieved by the program in the year 2006, what we expect in 2007, and provide savings forecasts for two market penetration scenarios for the periods 2007 to 2015 and 2007 to 2025. The target market penetration forecast represents our best estimate of future ENERGY STAR savings. It is based on realistic market penetration goals for each of the products. We also provide a forecast under the assumption of 100 percent market penetration; that is, we assume that all purchasers buy ENERGY STAR-compliant products instead of standard efficiency products throughout the analysis period.

395

2005 Status Report - Savings Estimates for the ENERGY STAR Voluntary  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Status Report - Savings Estimates for the ENERGY STAR Voluntary 5 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Title 2005 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Publication Type Journal Article LBNL Report Number LBNL-56380 Year of Publication 2007 Authors Sanchez, Marla C., Carrie A. Webber, Richard E. Brown, and Gregory K. Homan Pagination 35 Date Published 03/2006 Publisher Lawrence Berkeley National Laboratory ISBN Number LBNL-56380(2005) Keywords Enduse, Energy End-Use Forecasting, EUF Abstract ENERGY STAR is a voluntary labeling program designed to identify and promote energy-efficient products, buildings and practices. Operated jointly by the Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE), Energy Star labels exist for more than forty products, spanning office equipment, residential heating and cooling equipment, commercial and residential lighting, home electronics, and major appliances. This report presents savings estimates for a subset of ENERGY STAR labeled products. We present estimates of the energy, dollar and carbon savings achieved by the program in the year 2004, what we expect in 2005, and provide savings forecasts for two market penetration scenarios for the periods 2005 to 2010 and 2005 to 2020. The target market penetration forecast represents our best estimate of future ENERGY STAR savings. It is based on realistic market penetration goals for each of the products. We also provide a forecast under the assumption of 100 percent market penetration; that is, we assume that all purchasers buy ENERGY STAR-compliant products instead of standard efficiency products throughout the analysis period.

396

2006 Status Report - Savings Estimates for the ENERGY STAR Voluntary  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Status Report - Savings Estimates for the ENERGY STAR Voluntary 6 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Title 2006 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Publication Type Journal Article LBNL Report Number LBNL-56380 Year of Publication 2007 Authors Sanchez, Marla C., Carrie A. Webber, Richard E. Brown, and Gregory K. Homan Pagination 38 Date Published March 2006 Publisher Lawrence Berkeley National Laboratory ISBN Number LBNL-56380(2006) Keywords Enduse, Energy End-Use Forecasting, EUF Abstract ENERGY STAR® is a voluntary labeling program designed to identify and promote energy-efficient products, buildings and practices. Operated jointly by the Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE), ENERGY STAR labels exist for more than thirty products, spanning office equipment, residential heating and cooling equipment, commercial and residential lighting, home electronics, and major appliances. This report presents savings estimates for a subset of ENERGY STAR labeled products. We present estimates of the energy, dollar and carbon savings achieved by the program in the year 2005, what we expect in 2006, and provide savings forecasts for two market penetration scenarios for the periods 2006 to 2015 and 2006 to 2025. The target market penetration forecast represents our best estimate of future ENERGY STAR savings. It is based on realistic market penetration goals for each of the products. We also provide a forecast under the assumption of 100 percent market penetration; that is, we assume that all purchasers buy ENERGY STAR-compliant products instead of standard efficiency products throughout the analysis period.

397

Status report on fusion research  

Science Journals Connector (OSTI)

At the beginning of the twenty-first century mankind is faced with the serious problem of meeting the energy demands of a rapidly industrializing population around the globe. This, against the backdrop of fast diminishing fossil fuel resources (which have been the main source of energy of the last century) and the increasing realization that the use of fossil fuels has started to adversely affect our environment, has greatly intensified the quest for alternative energy sources. In this quest, fusion has the potential to play a very important role and we are today at the threshold of realizing net energy production from controlled fusion experiments. Fusion is, today, one of the most promising of all alternative energy sources because of the vast reserves of fuel, potentially lasting several thousands of years and the possibility of a relatively 'clean' form of energy, as required for use in concentrated urban industrial settings, with minimal long term environmental implications. The last decade and a half has seen unprecedented advances in controlled fusion experiments with the discovery of new regimes of operations in experiments, production of 16?MW of fusion power and operations close to and above the so-called 'break-even' conditions. A great deal of research has also been carried out in analysing various socio-economic aspects of fusion energy. This paper briefly reviews the various aspects and achievements of fusion research all over the world during this period.

International Fusion Research Council (IFRC)

2005-01-01T23:59:59.000Z

398

Special Rreview of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Review of the Special Review of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation May 2011 July 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose and Scope ............................................................................................................................... 1 2.0 Results ................................................................................................................................................... 1 3.0 Conclusions ........................................................................................................................................... 5

399

Special Rreview of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation  

NLE Websites -- All DOE Office Websites (Extended Search)

Special Review of the Special Review of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation May 2011 July 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose and Scope ............................................................................................................................... 1 2.0 Results ................................................................................................................................................... 1 3.0 Conclusions ........................................................................................................................................... 5

400

"Y/N","Status","Efficiency Measure(s)/ECMs","System Type","End Use","Grid","Fed or Indian","RECs Retained","Scope","Term","Purchased","Biomass1","Biomass2","Funding Source","Fleet Strategy","Vehicle","Size","Fuel","Fleet Fund","Compliance Path","GP Status","Version","HPSB","2015 Status","Power data"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y/N","Status","Efficiency Measure(s)/ECMs","System Type","End Use","Grid","Fed or Indian","RECs Retained","Scope","Term","Purchased","Biomass1","Biomass2","Funding Source","Fleet Strategy","Vehicle","Size","Fuel","Fleet Fund","Compliance Path","GP Status","Version","HPSB","2015 Status","Power data" Y/N","Status","Efficiency Measure(s)/ECMs","System Type","End Use","Grid","Fed or Indian","RECs Retained","Scope","Term","Purchased","Biomass1","Biomass2","Funding Source","Fleet Strategy","Vehicle","Size","Fuel","Fleet Fund","Compliance Path","GP Status","Version","HPSB","2015 Status","Power data" "No","Identified","Advanced Metering Systems","Biomass","Excluded","Electric On-Grid","On Federal or Indian Land, On User Site",0,"Scope 1","Long-Term (> 10)","Electric Renewable Energy","Agricultural byproducts","NA","Line Item","Acquire More Fuel-Efficient Vehicles","Compressed Natural Gas (CNG)","Buses","B100","Direct","Guiding Principles","Met",2.2,"LEED® Certified","D&D in Progress","Actual"

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Analysis Standard Operating Procedure  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EVM project analysis is to provide consistent and timely insight to project status in order to enable timely, effective management decisions. In conjunction with conducting...

402

Annual Hanford Site environmental permitting status report  

SciTech Connect

This Annual Hanford Site Environmental Permitting Status Report (Status Report) was prepared in response to requirements prescribed in U.S. Department of Energy (DOE) Order 5400.2A, `Environmental Compliance Issue Coordination`. This Order, canceled in April 1996, required that information on existing and anticipated environmental permitting for DOE facilities be submitted (or updated) annually by October 1 of each calendar year. Although the Order was canceled, the need for this Status Report still remains. For example, the Washington State Department of Ecology`s (Ecology) Dangerous Waste Permit Application Requirements (Publication Number 95-402, June 1996), Checklist Section J, calls for current information on existing and anticipated environmental permitting. As specified in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28), this Status Report serves as the vehicle for meeting this requirement for the Hanford Facility. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by the Resource Conservation and Recovery Act (RCRA) of 1976, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) are addressed. Information on RCRA and non-RCRA permitting is included and is current as of July 31, 1996.

Thompson, S.A.

1996-10-01T23:59:59.000Z

403

ARM Value-Added Cloud Products: Description and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Value-Added Cloud Products: Value-Added Cloud Products: Description and Status M. A. Miller, K. L. Johnson, and D. T. Troyan Brookhaven National Laboratory Upton, New York E. E. Clothiaux Pennsylvania State University University Park, Pennsylvania E. J. Mlawer Atmospheric and Environmental Research, Inc. Cambridge, Massachusetts G. G. Mace University of Utah Salt Lake City, Utah Introduction The Atmospheric Radiation Measurement (ARM) Program operates a variety of state-of-the-art active and passive remote sensors at its sites. These sensors provide information about the thermodynamic state of the atmosphere and the structure of the clouds that are present above the site. Families of value- added products (VAPs) that contain geophysically relevant data are produced from the electronic

404

Underground coal gasification: a brief review of current status  

SciTech Connect

Coal gasification is a promising option for the future use of coal. Similarly to gasification in industrial reactors, underground coal gasification (UCG) produces syngas, which can be used for power generation or for the production of liquid hydrocarbon fuels and other valuable chemical products. As compared with conventional mining and surface gasification, UCG promises lower capital/operating costs and also has other advantages, such as no human labor underground. In addition, UCG has the potential to be linked with carbon capture and sequestration. The increasing demand for energy, depletion of oil and gas resources, and threat of global climate change lead to growing interest in UCG throughout the world. In this article, we review the current status of this technology, focusing on recent developments in various countries.

Shafirovich, E.; Varma, A. [Purdue University, West Lafayette, IN (United States). School of Chemical Engineering

2009-09-15T23:59:59.000Z

405

Status of the Boeing Dish Engine Critical Component project  

SciTech Connect

The Boeing Company's Dish Engine Critical Component (DECC) project started in April of 1998. It is a continuation of a solar energy program started by McDonnel Douglas (now Boeing) and United Stirling of Sweden in the mid 1980s. The overall objectives, schedule, and status of this project are presented in this paper. The hardware test configuration, hardware background, operation, and test plans are also discussed. A summary is given of the test data, which includes the daily power performance, generated energy, working-gas usage, mirror reflectivity, solar insolation, on-sun track time. Generating time, and system availability. The system performance based upon the present test data is compared to test data from the 1984/88 McDonnel Douglas/United Stirling AB/Southern California Edison test program. The test data shows that the present power, energy, and mirror performance is comparable to when the hardware was first manufactured 14 years ago.

Stone, K.W.; Nelving, H.; Braun, H.W.; Clark, T.B.; Diver, R.B.

1999-07-01T23:59:59.000Z

406

Green Power Marketing in the United States: A Status Report (Ninth Edition)  

NLE Websites -- All DOE Office Websites (Extended Search)

of of Energy Office of Energy Efficiency & Renewable Energy National Renewable Energy Laboratory Innovation for Our Energy Future Green Power Marketing in the United States: A Status Report (Ninth Edition) Lori Bird and Blair Swezey Technical Report NREL/TP-640-40904 November 2006 NREL is operated by Midwest Research Institute ● Battelle Contract No. DE-AC36-99-GO10337 Green Power Marketing in the United States: A Status Report (Ninth Edition) Lori Bird and Blair Swezey Prepared under Task No. ASG6.1003 Technical Report NREL/TP-640-40904 November 2006 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy

407

Green Power Marketing in the United States: A Status Report ; Fifth Edition  

NLE Websites -- All DOE Office Websites (Extended Search)

in the in the United States: A Status Report Fifth Edition August 2000 * NREL/TP-620-28738 Blair Swezey and Lori Bird National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 August 2000 * NREL/TP-620-28738 Green Power Marketing in the United States: A Status Report Fifth Edition Blair Swezey and Lori Bird Prepared under Task No. AS65.3010 NOTICE This report was prepared as an account of work sponsored by an agency of the United States

408

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2011  

SciTech Connect

This status report, fifth in a series of annual status reports from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), discusses the achievements and challenges of fuel cell propulsion for transit and summarizes the introduction of fuel cell transit buses in the United States. Progress this year includes an increase in the number of fuel cell electric buses (FCEBs), from 15 to 25, operating at eight transit agencies, as well as increased diversity of the fuel cell design options for transit buses. The report also provides an analysis of the combined results from fuel cell transit bus demonstrations evaluated by NREL with a focus on the most recent data through July 2011 including fuel cell power system reliability and durability; fuel economy; roadcall; and hydrogen fueling results. These evaluations cover 22 of the 25 FCEBs currently operating.

Eudy, L.; Chandler, K.; Gikakis, C.

2011-11-01T23:59:59.000Z

409

Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan  

SciTech Connect

This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

SIMMONS, F.M.

2000-12-01T23:59:59.000Z

410

Renewables in India : Status and Future Potential  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewables in India : Status and Future Potential Renewables in India : Status and Future Potential Speaker(s): Luis Fernandes Date: July 9, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose We analyse the status and the trends in the growth of renewables in India. We propose a methodology linking micro-simulation to macro-modelling to obtain technical and economic potential estimates for solar water heaters in residential and commercial and biomass gasifiers for thermal applications in industry. We assess the sustainability of renewables based on the criteria of life cycle cost, net energy ratio, resource constraint and greenhouse gas emissions. The renewable based technologies seem to be sustainable based on all criteria, except the high life cycle cost. In some cases e.g. in wind and biomass based systems land availability may

411

ORISE: Voluntary Protection Program (VPP) Star Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Voluntary Protection Program (VPP) Star Status Voluntary Protection Program (VPP) Star Status Within the U.S. Department of Energy's (DOE) Voluntary Protection Program (VPP), there are three levels of recognition: STAR, MERIT and DEMONSTRATION. Contractors' programs that meet the requirements for outstanding safety and health programs, earn VPP STAR status-the highest achievement level. In December of 2003, the Oak Ridge Institute for Science and Education (ORISE) first earned STAR distinction following a comprehensive evaluation of its application for the VPP program. At that time, ORISE was just the 21st DOE site and the first in Tennessee to earn such exemplary recognition. In 2011 ORISE received its seventh consecutive Star of Excellence award. Today, ORISE is one of more than two dozen DOE sites to achieve VPP STAR

412

ARM - Value-Added Product Status Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Reports Status Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Value-Added Product Status Reports ARM Climate Research Facility Quarterly Value-Added Product Report July 1-September 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report April 1-June 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report January 1-March 31, 2013 (PDF, 268KB) ARM Climate Research Facility Quarterly Value-Added Product Report October 1-December 31, 2012 (PDF, 271KB) ARM Climate Research Facility Quarterly Value-Added Product Report

413

Environmental Programs: Status of Work and Current Priorities for FY13  

SciTech Connect

Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.

Jones, Patricia [Los Alamos National Laboratory

2012-08-17T23:59:59.000Z

414

Technology status and project development risks of advanced coal power generation technologies in APEC developing economies  

SciTech Connect

The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

Lusica, N.; Xie, T.; Lu, T.

2008-10-15T23:59:59.000Z

415

Status and perspective of the GERDA neutrinoless double beta decay experiment  

Science Journals Connector (OSTI)

Gerda the GERManium Detector Array [1] is a new double beta decay experiment which is currently under commissioning in the Infn National Gran Sasso Laboratory (Lngs) Italy. It is implementing a new shielding concept by operating bare Ge diodes - enriched in 76 Ge - in high purity liquid argon supplemented by a water shield. The paper presents the status of the experiment results from the commissioning and a summary of planned future activities.

K. T. Knpfle; GERDA Collaboration

2012-01-01T23:59:59.000Z

416

Building Operator Certification  

E-Print Network (OSTI)

programmed settings review ? Verify damper settings ? Check static pressure sensor calibration ? Review occupant complaint records and remedies ? Review established temperature set points HVAC Controls Operational Review ESL-KT-13-12-49 CATEE 2013: Clean... Operator Certification Energy Efficiency through Operator Training BOC Has Two Levels Level I: Building Systems Maintenance ? Two or more years experience (5 yrs avg) ? Outcome: Basic understanding of electrical, HVAC and lighting systems...

Lilley, D.

2013-01-01T23:59:59.000Z

417

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

418

Business Operations Contacts  

Office of Energy Efficiency and Renewable Energy (EERE)

If you have a question for the Office of Business Operations, you can use this contact information to reach the office you're interested in:

419

Semicausal operations are semilocalizable  

E-Print Network (OSTI)

We prove a conjecture by DiVincenzo, which in the terminology of Preskill et al. [quant-ph/0102043] states that ``semicausal operations are semilocalizable''. That is, we show that any operation on the combined system of Alice and Bob, which does not allow Bob to send messages to Alice, can be represented as an operation by Alice, transmitting a quantum particle to Bob, and a local operation by Bob. The proof is based on the uniqueness of the Stinespring representation for a completely positive map. We sketch some of the problems in transferring these concepts to the context of relativistic quantum field theory.

Eggeling, T; Werner, R F

2002-01-01T23:59:59.000Z

420

Fermilab | Tevatron | Tevatron Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Fermilab's Accelerator Complex Fermilab's Accelerator Complex has 10 accelerators. The Tevatron, which shuts down on Sept. 30, is one of those accelerators. The...

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

422

Challenge # 3 ? Operational Issues  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Potential for a renewable heating oil substitution Challenge 3 - Operational Issues What are the most significant barriers to overcome in each market segment? Fernando Preto The...

423

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

424

Indonesia and Climate Change: Current Status and Policies | Open Energy  

Open Energy Info (EERE)

and Climate Change: Current Status and Policies and Climate Change: Current Status and Policies Jump to: navigation, search Name Indonesia and Climate Change: Current Status and Policies Agency/Company /Organization World Bank, Department for International Development Indonesia Sector Energy, Land Focus Area Renewable Energy, Forestry, Agriculture Topics Policies/deployment programs, Background analysis Resource Type Publications Website http://siteresources.worldbank Country Indonesia South-Eastern Asia References Indonesia and Climate Change: Current Status and Policies[1] Background References ↑ "Indonesia and Climate Change: Current Status and Policies" Retrieved from "http://en.openei.org/w/index.php?title=Indonesia_and_Climate_Change:_Current_Status_and_Policies&oldid=328842

425

Suspect Counterfeit Items Criteria Review and Approach Document , Phase 1 - Management - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suspect/Counterfeit Items Suspect/Counterfeit Items Criteria Review and Approach Document (CRAD) NNSA/Nevada Site Office Facility Representative Division Phase 1 - Management Performance Objective: Management should have a formal system under Quality Assurance with adequate controls defined and implemented to identify and preclude Suspect/Counterfeit Items (S/CI) from being introduced into safety systems and applications that create potential hazards. CRITERIA: Management should have a formal system of controls in place for assurance that all items procured meet the requirements for their intended use. Management should have a system of mechanisms to continuously maintain current, accurate, updated information on SC/Is and associated suppliers using all available sources. Management should have a training program with detailed records that

426

ATF2 Summary and Status  

SciTech Connect

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

Alabau-Gonzalvo, J.; /Valencia U., IFIC; Alabau Pons, M.; /CERN; Amann, J.; /SLAC; Angal-Kalinin, D.; /Cockcroft Inst. Accel. Sci. Tech.; Apsimon, R.; /Oxford U., JAI; Araki, S.; /KEK, Tsukuba; Aryshev, A.; /KEK, Tsukuba; Bai, S.; /Beijing, Inst. High Energy Phys.; Bambade, P.; /Orsay, LAL /KEK, Tsukuba; Bellomo, P.; /SLAC; Bett, D.; /Oxford U., JAI; Blair, G.; /Oxford U., JAI; Blanch, C.; /Valencia U., IFIC; Bolzon, B.; /CERN; Boogert, S.; /Oxford U., JAI; Boorman, G.; /Oxford U., JAI; Burrows, P.; /Oxford U., JAI; Christian, G.; /Oxford U., JAI; Coe, P.; /Oxford U., JAI; Constance, B.; /Oxford U., JAI; Corner, L.; /Oxford U., JAI /Oxford U., JAI /CERN /Oxford U., JAI /DESY /Valencia U., IFIC /SLAC /KEK, Tsukuba /Beijing, Inst. High Energy Phys. /ESIA, Annecy /Fermilab /Ecole Polytechnique /KEK, Tsukuba /Kyungpook Natl. U. /KEK, Tsukuba /Pohang Accelerator Lab. /Pohang Accelerator Lab. /Kyoto U., Inst. Chem. Res. /ESIA, Annecy /Cockcroft Inst. Accel. Sci. Tech. /Tokyo U. /Oxford U., JAI /Kyungpook Natl. U. /Kyungpook Natl. U. /Pohang Accelerator Lab. /Kyungpook Natl. U. /Tokyo U. /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /SLAC /University Coll. London /KEK, Tsukuba /SLAC /Oxford U., JAI /KEK, Tsukuba /Tokyo U. /SLAC /Oxford U., JAI /Tohoku U. /KEK, Tsukuba /Tokyo U. /Pohang Accelerator Lab. /Brookhaven /SLAC /Oxford U., JAI /SLAC /SLAC /CERN /Oxford U., JAI /Orsay, LAL /Fermilab /Tohoku U. /Manchester U. /CERN /Oxford U., JAI /SLAC /SLAC /SLAC /Tokyo U. /KEK, Tsukuba /Oxford U., JAI /Hiroshima U. /KEK, Tsukuba /KEK, Tsukuba /CERN /KEK, Tsukuba /Oxford U., JAI /Ecole Polytechnique /Oxford U., JAI /Beijing, Inst. High Energy Phys. /SLAC /Oxford U., JAI /Fermilab /SLAC /SLAC /Liverpool U. /SLAC /Tokyo U. /Tokyo U. /Tokyo U. /Tokyo U. /KEK, Tsukuba /SLAC /CERN

2012-04-19T23:59:59.000Z

427

Radioactive Waste Incineration: Status Report  

SciTech Connect

Incineration is generally accepted as a method of reducing the volume of radioactive waste. In some cases, the resulting ash may have high concentrations of materials such as Plutonium or Uranium that are valuable materials for recycling. Incineration can also be effective in treating waste that contains hazardous chemicals as well as radioactive contamination. Despite these advantages, the number of operating incinerators currently in the US currently appears to be small and potentially declining. This paper describes technical, regulatory, economic and political factors that affect the selection of incineration as a preferred method of treating radioactive waste. The history of incinerator use at commercial and DOE facilities is summarized, along with the factors that have affected each of the sectors, thus leading to the current set of active incinerator facilities. In summary: Incineration has had a long history of use in radioactive waste processing due to their ability to reduce the volume of the waste while destroying hazardous chemicals and biological material. However, combinations of technical, regulatory, economic and political factors have constrained the overall use of incineration. In both the Government and Private sectors, the trend is to have a limited number of larger incineration facilities that treat wastes from a multiple sites. Each of these sector is now served by only one or two incinerators. Increased use of incineration is not likely unless there is a change in the factors involved, such as a significant increase in the cost of disposal. Medical wastes with low levels of radioactive contamination are being treated effectively at small, local incineration facilities. No trend is expected in this group. (authors)

Diederich, A.R.; Akins, M.J. [WorleyParsons, Reading, PA (United States)

2008-07-01T23:59:59.000Z

428

Checkout Expendables Item Price Item Price Item Price  

E-Print Network (OSTI)

$6.00 ft Mini DV $5.00 Full CTO $6.00 ft white paper tape $5.00 Mini HDV $7.00 .3 ND $6.00 ft 1/8", 1 $9.50 1650 $200.00 24" Blk Wrap $35 per roll/$2 ft Case lock $9.00 Full Grid Cloth $7.00 ft silica gel pack $10.00 Quiet Grid Cloth $7.00 ft Specialty (Cont) Misc. Spec. Gel Sheet Plus Green $6.00 ft

Dyer, Bill

429

.JETEQUIPMENT &TOOLS OPERATOR'S MANUAL  

E-Print Network (OSTI)

.JETEQUIPMENT &TOOLS OPERATOR'S MANUAL JDP-14J/14M/17M/14JF/14 MF/17MF DRILL PRESS Stock No. .JET-6000 FAX[253] 939-8001 #12;OPERATINGINSTRUCTIONS Before operating the unit, please read this manual workpiece. 7. MAINTAIN TOOLS WITH CARE. Keep tools sharp and clean for the best and safest performance

Kleinfeld, David

430

Suspect/Counterfeit Items Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1B, Quality Assurance  

Directives, Delegations, and Requirements

This Guide provides guidance to assist DOE/NNSA and its contractors in mitigating the safety threat of suspect/counterfeit items (S/CIs). Cancels DOE G 440.1-6, Implementation Guide for use with Suspect/Counterfeit Items Requirements of DOE O 440.1, Worker Protection Management; 10 CFR 830.120; and DOE O 5700.6C, Quality Assurance, dated 6-30-97. Canceled by DOE G 414.1-2B.

2004-11-03T23:59:59.000Z

431

Operability and Emissions from a Medium-Duty Fleet Operating...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operability and Emissions from a Medium-Duty Fleet Operating with GTL Fuel and Catalyzed DPFs Operability and Emissions from a Medium-Duty Fleet Operating with GTL Fuel and...

432

3Compliance Status 2003 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

3-1 3Compliance Status 2003 SITE ENVIRONMENTAL REPORT Brookhaven National Laboratory (BNL supply met all drinking water requirements. Groundwater monitoring at the Major Petroleum Facility reported to the New York State Department of Environmental Conservation (NYSDEC). Twenty-two reportable

Homes, Christopher C.

433

Status of the NRC Decommissioning Program  

SciTech Connect

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

434

Current Status of Vaccines for Schistosomiasis  

Science Journals Connector (OSTI)

...McManus. 2004. The cytoskeleton and motor proteins of human schistosomes and their...Holmgren. 2004. Current status and future prospects for a vaccine against schistosomiasis...Hookworm vaccines-past, present and future. Lancet Infect. Dis. 6: 733-741...

Donald P. McManus; Alex Loukas

2008-01-01T23:59:59.000Z

435

The Population Status The American Alligator  

E-Print Network (OSTI)

Carolina by Thomas M. Murphy A Publication of the Savannah River Plant National Environmental Research Park'S SAVANNAH RIVER PLANT NATIONAL ENVIRONMENT RESEARCH PARK Copies may be obtained from Savannah River Ecology Laboratory #12;- The Population Status of the American Alligator on the Savannah River Plant, South Carolina

Georgia, University of

436

Kaonic Hydrogen: Status of the DEAR Experiment  

Science Journals Connector (OSTI)

......al. Nucl. Instrum. Methods (1987) A 253:365...al. Nucl. Instrum. Methods (1996) A 377:346...al. Nucl. Instrum. Methods (2003) A 496:315...149, 2003 Kaonic Hydrogen Status of the DEAR Experiment...annihilation. The Phi production cross section is 3000......

G. Beer; A. M. Bragadireanu; M. Cargnelli; C. Curceanu (Petrascu); J.-P. Egger; H. Fuhrmann; M. Giersch; C. Guaraldo; M. Iliescu; T. Ishiwatari; K. Itahashi; M. Iwasaki; P. Kienle; B. Lauss; V. Lucherini; L. Ludhova; J. Marton; F. Mulhauser; T. Ponta; L. A. Schaller; D. L. Sirghi; F. Sirghi; J. Zmeskal

2003-01-01T23:59:59.000Z

437

NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT  

E-Print Network (OSTI)

NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT Prepared For: California Energy Commission Prepared No. 700-05-002 Prepared For: California Energy Commission Barbara Byron, Senior Nuclear Policy;Abstract This consultant report examines how nuclear power issues have evolved since publication

438

Solar Photovoltaics development -Status and perspectives  

E-Print Network (OSTI)

Solar Photovoltaics development - Status and perspectives Jørgen Fenhann Risø National Laboratory for the development of solar photovoltaics, contributing to the Macro Task E1 on production cost for fusion.S. with 53 MWp followed by Japan and EU. Until now off-grid installation have dominated the solar PV market

439

Status of Transuranic Bearing Metallic Fuel Development  

SciTech Connect

This paper summarizes the status of the metallic fuel development under the Advanced Fuel Cycle Initiative (AFCI). The metallic fuel development program includes fuel fabrication, characterization, advanced cladding research, irradiation testing and post-irradiation examination (PIE). The focus of this paper is on the recent irradiation experiments conducted in the Advanced Test Reactor and some PIE results from these tests.

Steve Hayes; Bruce Hilton; Heather MacLean; Debbie Utterbeck; Jon Carmack; Kemal Pasamehmetoglu

2009-09-01T23:59:59.000Z

440

Magnetic Confinement Fusion Science Status and Challenges  

E-Print Network (OSTI)

Magnetic Confinement Fusion Science Status and Challenges S. Prager University of Wisconsin February, 2005 #12;Two approaches to fusion Inertial confinement extremely dense, short-lived Magnetic ·Control plasma disruptions ·Develop new magnetic configurations ·Control the plasma-wall interaction

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Current status of the US RERTR Program  

SciTech Connect

This paper describes the status of the RERTR Program. The main objective is to provide the audience with some orientation and sense of perspective that may assist in viewing the other program presentations as part of an overall effort, rather than as separate and unrelated activities.

Travelli, A.

1982-01-01T23:59:59.000Z

442

Neutrinoless Double $?$-Decay: Status and Future  

E-Print Network (OSTI)

A brief summary of the status of neutrino masses, mixing and oscillations is presented. Neutrinoless double $\\beta$-decay is considered. Predictions for the effective Majorana mass are reviewed. A possible test of the calculations of nuclear matrix elements of the $0\

S. M. Bilenky

2005-09-11T23:59:59.000Z

443

STATUS OF THE NRC'S DECOMMISSIONING PROGRAM  

SciTech Connect

On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

Orlando, D. A.; Camper, L. W.; Buckley, J.

2002-02-25T23:59:59.000Z

444

Fuel Cell Technology Status - Voltage Degradation (Presentation)  

SciTech Connect

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

Kurtz, J.; Wipke,; Sprik, S.; Saur, G.

2012-06-01T23:59:59.000Z

445

EBT-P project status report  

SciTech Connect

This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project.

Not Available

1983-11-01T23:59:59.000Z

446

Hg System Assembly and Testing Status  

E-Print Network (OSTI)

OF ENERGY Current Status / Next Steps · Populate secondary box ports · Complete plumbing inside secondary #12;2VRVS Meeting 1 Nov 2006 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Welding OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Cart Modifications · Secondary box center

McDonald, Kirk

447

IMMIGRATION HANDBOOK (F-1 VISA STATUS)  

E-Print Network (OSTI)

IMMIGRATION HANDBOOK (F-1 VISA STATUS) FOR FSU DEPARTMENTS #12;IMMIGRATION HANDBOOK FOR FSU? What if an F-1 student wishes to withdraw from FSU or take a leave of absence? What does an F-1 student need to do if he/she cannot complete the program before his/her I-20 expiration date? How does

448

Peer-to-peer inventory management of returnable transport items: A design science approach  

Science Journals Connector (OSTI)

The packaged gas industry suffers from the loss of gas cylinders due to ineffective inventory management and lack of suitably robust identification technologies. This paper takes a design science approach to this problem and contributes a prototype inventory management system, based on peer-to-peer RFID technology, developed to improve this situation. Evaluative work is shown which suggests that the system is able to operate effectively within a controlled environment. The benefits of the system are discussed, in addition to the hurdles which are still to be faced in the adoption of the technology.

Alex Mason; Andy Shaw; Ahmed Al-Shammaa

2012-01-01T23:59:59.000Z

449

The Current Status of Male and Female Sterilization Procedures  

Science Journals Connector (OSTI)

10 December 1976 research-article The Current Status of Male and Female Sterilization Procedures I. Lubell Ruth Frischer The current status of male and female sterilization is defined. Current techniques involved in the surgical occlusion...

1976-01-01T23:59:59.000Z

450

Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1  

SciTech Connect

The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized into six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.

NONE

1995-08-01T23:59:59.000Z

451

Status of reduced enrichment program for research reactors in Japan  

SciTech Connect

The status of reduced enrichment program for research reactors in Japan will be reviewed. The reduced enrichment programs for the JRR-3M, JRR-4 and JMTR of Japan Atomic Energy Agency (JAEA, former name is Japan Atomic Energy Research Institute (JAERI)) has been completed by 1999, and the reactors are being satisfactory operated using LEU fuels. The KUR of Kyoto University Research Reactor Institute (KURRI) has been partially completed and is still in progress under the Joint Study Program with Argonne National Laboratory (ANL). The JRR-3M using LEU silicide fuel elements have done a functional test by the Japanese Government in 2000, and the property of the reactor core was satisfied. JAEA has established a 'U-Mo fuel ad hoc committee' and has been studying the U-Mo fuel installation plan by carefully observing the development situation of the U-Mo fuel. In KURRI, the KUR has terminated its operation using HEU fuel on February 2006. The HEU KUR spent fuel elements will be sent to the U.S. by March 2008. Licensing for the full core conversion of KUR to LEU fuel is under progress and the core conversion to LEU is expected to be completed in 2008. (author)

Unesaki, Hironobu [Research Reactor Institute, Kyoto University, Asashiro-nishi 2-1010, Kumatori-cho, Sennan-gun, Osaka 590-0494 (Japan); Ohta, Kazunori; Inoue, Takeshi [Japan Atomic Energy Agency, Shirakata Shirane 2-4, Tokai-mura, Naka-gun, Ibaraki-ken 319-1195 (Japan)

2008-07-15T23:59:59.000Z

452

Form EIA-930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

930 930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT INSTRUCTIONS Due Date: mm/dd/yyyy Approved: OMB No. 1905-0129 Approval Expires: 10/31/2016 Burden: 0.19 hours Page 1 Draft for Discussion only PURPOSE Form EIA-930 requires Internet posting of hourly balancing authority operating data. The posted data are used to monitor the current status and trends of the electric power industry, and to support enhancement of electric system operations. REQUIRED RESPONDENTS For the contiguous United States: all entities that are listed in NERC's Compliance Registry as a balancing authority must post balancing authority operating information required by this survey. Other than the Midwest ISO (MISO), registered balancing authorities that are parties

453

Monitored Geologic Repository Operations Monitoring and Control System Description Document  

SciTech Connect

The Monitored Geologic Repository Operations Monitoring and Control System provides supervisory control, monitoring, and selected remote control of primary and secondary repository operations. Primary repository operations consist of both surface and subsurface activities relating to high-level waste receipt, preparation, and emplacement. Secondary repository operations consist of support operations for waste handling and treatment, utilities, subsurface construction, and other selected ancillary activities. Remote control of the subsurface emplacement operations, as well as, repository performance confirmation operations are the direct responsibility of the system. In addition, the system monitors parameters such as radiological data, air quality data, fire detection status, meteorological conditions, unauthorized access, and abnormal operating conditions, to ensure a safe workplace for personnel. Parameters are displayed in a real-time manner to human operators regarding surface and subsurface conditions. The system performs supervisory monitoring and control for both important to safety and non-safety systems. The system provides repository operational information, alarm capability, and human operator response messages during emergency response situations. The system also includes logic control to place equipment, systems, and utilities in a safe operational mode or complete shutdown during emergency response situations. The system initiates alarms and provides operational data to enable appropriate actions at the local level in support of emergency response, radiological protection response, evacuation, and underground rescue. The system provides data communications, data processing, managerial reports, data storage, and data analysis. This system's primary surface and subsurface operator consoles, for both supervisory and remote control activities, will be located in a Central Control Center (CCC) inside one of the surface facility buildings. The system consists of instrument and control equipment and components necessary to provide human operators with sufficient information to monitor and control the operation of the repository in an efficient and safe manner. The system consists of operator consoles and workstations, multiple video display terminals, communications and interfacing equipment, and instrument and control software with customized configuration to meet the needs of the Monitored Geologic Repository (MGR). Process and logic controllers and the associated input/output units of each system interfaced with this system will be configured into Remote Terminal Units (RTU) and located close to the systems to be monitored and controlled. The RTUs are configured to remain operational should communication with CCC operations be lost. The system provides closed circuit television to selectively view systems, operations, and equipment areas and to aid in the operation of mechanical systems. Control and monitoring of site utility systems will be located in the CCC. Site utilities include heating, ventilation, and air conditioning equipment; plant compressed air; plant water; firewater; electrical systems; and inert gases, such as nitrogen, if required. This system interfaces with surface and subsurface systems that either generate output data or require remote control input. The system interfaces with the Site Communications System for bulk storage of operational data, on-site and off-site communication, and a plant-wide public announcement system. The system interfaces with the Safeguards and Security System to provide operational status and emergency alarm indications. The system interfaces with the Site Operation System to provide site wide acquisition of data for analysis and reports, historical information for trends, utility information for plant operation, and to receive operating plans and procedures.

E.F. Loros

2000-06-29T23:59:59.000Z

454

Operations Research Analysts  

U.S. Energy Information Administration (EIA) Indexed Site

Operations Research Analysts Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or more of the following important functions: * Develop, design, perform, and document a broad range of analyses and studies involving current and projected energy pricing, production, supply, and distribution, and consumption * Using computer programming skills and knowledge of energy industries and markets, designs and develops math-

455

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

456

Operations Research Analyst  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as an Operations Research Analyst assigned to CEPE, in Washington, DC and is responsible for conducting independent cost and schedule estimates of...

457

Oak Ridge Operations.  

Office of Legacy Management (LM)

4s - 22 Department of Energy Oak Ridge Operations. SI9J>liB P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director...

458

Operating Oak Ridge's "Calutrons"  

NLE Websites -- All DOE Office Websites (Extended Search)

RIDGE'S CALUTRONS: In this oral history, Theodore Rockwell talks about the Y-12 plant at Oak Ridge where the calutrons were operated by young women, many just out of high school....

459

Oak Ridge Operations YTO  

Office of Legacy Management (LM)

ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I - CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a...

460

Protection Program Operations  

Directives, Delegations, and Requirements

This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

2014-10-14T23:59:59.000Z

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Operations Security Program  

Directives, Delegations, and Requirements

To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

1992-04-30T23:59:59.000Z

462

Operations and Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

463

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

464

CH Packaging Operations Manual  

SciTech Connect

This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

Washington TRU Solutions LLC

2005-06-13T23:59:59.000Z

465

Cogeneration Operational Issues  

E-Print Network (OSTI)

important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation...

Williams, M.

466

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

adverse impacts 40 CFR 1508.27 (b)(l): The selected action establishes a capability to conduct outdoor linac operations at higher power and greater standoff distances. The SOX...

467

Crane Operation Training  

NLE Websites -- All DOE Office Websites (Extended Search)

remove power from the crane and inform the facility management or CAMD safety. Place a lockout tag on the remote control unit. All CAMD crane operations are conducted using the...

468

Plant Operations Executive Director  

E-Print Network (OSTI)

Campus North Campus Recycling Operations Materials Human Resources Payroll Misc Svs Special Projects Planning Spray Shop Glass Shop Upholstery Shop Plant IT Painting Services G. Weincouff Human Resources Business Services Estimating Shutdown Coordination Scheduling L. Rastique Human Resources 67398 M

Awtar, Shorya

469

Corporate Operating Experience Program  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

470

Essays on Retail Operations  

E-Print Network (OSTI)

-fraction and all-or-none inspection. We further perform a case study to identify deficiencies of store operating practices given different risk preferences. Our findings provide practical guidelines for managers to design cost-efficient inspection policy...

Chuang, Hao-Chun

2013-03-12T23:59:59.000Z

471

Transmission and Storage Operations  

Energy Savers (EERE)

to see minimal to none in static or dynamic mode) - Rates are dependent on size, mechanical wear and operating pressures * PM * PdM 5 Methane Release Reduction Can the gas be...

472

Development of Operation System  

Science Journals Connector (OSTI)

We are gradually developing a total hospital information system known as GUNMAS (Gunma University Network for Medical-Hospital- Information Archiving System). an operation system is also being developed as part o...

Seiji Kato M.D.; Yasuharu Kitani M.D.

1992-01-01T23:59:59.000Z

473

Nationwide survey on the operational status of electron accelerators for radiation therapy in Japan  

Science Journals Connector (OSTI)

A nationwide survey was conducted on electron accelerators for radiation therapy in Japan for obtaining fundamental data on the actual ... all medical institutions equipped with electron accelerators for radiation

Ichiro Yamaguchi; Shinji Tanaka; Toshioh Fujibuchi

2010-07-01T23:59:59.000Z

474

OPERATION STATUS OF HIGH INTENSITY ION BEAMS AT GANIL F. Chautard, G. Sncal, GANIL, Caen, France  

E-Print Network (OSTI)

. · A high-energy experiment. · An auxiliary experiments sharing the CSS2 beam · Additionally, the cyclotron, Venice, Italy 54 Circular Accelerators in2p3-00396700,version1-29Jul2010 Author manuscript, published

Paris-Sud XI, Université de

475

AGRICULTURE, 2004 Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF WISCONSIN AGRICULTURE, 2004 Status of the Wisconsin Farm Economy Situation and Outlook Situation: Implications for U.S. Agriculture · The Evolution and Current Status of Livestock Production and Meat Processing in Wisconsin Department of Agricultural and Applied Economics College of Agricultural

Radeloff, Volker C.

476

Wisconsin Agriculture Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF Wisconsin Agriculture 2011 · Status of the Wisconsin Farm Economy · Current Outlook: Farm of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension University of Wisconsin-Extension #12;Status of Wisconsin Agriculture, 2011 An annual

Radeloff, Volker C.

477

Pipeline operation and safety  

SciTech Connect

Safety is central to the prosperity of the pipeline industry and the need to maintain high standards of the safety at all times is of paramount importance. Therefore, a primary concern of pipeline operator is adequate supervision and the control of the operation of pipelines. Clearly defined codes of practice, standards and maintenance schedules are necessary if protection is to be afforded to the pipeline system employees, the public at large, and the environment.

Tadors, M.K. [Petroleum Pipelines Co., Cairo (Egypt)

1996-12-31T23:59:59.000Z

478

Thermal-storage-subsystem analysis report (RADL Item 5-1)  

SciTech Connect

Calculations and internal Rocketdyne memos generated in support of the Thermal Storage Subsystem design are presented. The calculations are presented informally, i.e., original hand calculations are included. General descriptions of computer programs are given where applicable. Correlation of experimental test results with model predictions are made. Environmental extremes are summarized. These extremes, together with Pilot Plant operating requirements, form the inputs to the analyses. Outputs of the thermal analyses in the form of temperatures and temperature gradients are used as inputs to the stress analyses. System level analyses are presented. Subsequent analyses are presented in the order of the WBS format, i.e., Thermal Storage Unit, heat exchangers, controls and instrumentation. The results of charging and discharging loop simulations are included. Subsystem level analyses include pressure loss calculations for both steam/water loops and for both oil loops. These pressure loss calculations provide sizing requirements for pumps, valves, pipes and other components.

Not Available

1980-02-01T23:59:59.000Z

479

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

480

FPA Meeting, 10/11-12/05 Status of World ST Research Status of World Spherical Torus Research  

E-Print Network (OSTI)

ST to Explore Plasma Limits as A 1 Pegasus (US) #12;FPA Meeting, 10/11-12/05 Status of World STFPA Meeting, 10/11-12/05 Status of World ST Research Status of World Spherical Torus Research and Energy Policy October 11-12, 2005, Washington, DC Supported by Office of Science College W&M Colorado Sch

Note: This page contains sample records for the topic "operating status item" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Status and Impact of State MTBE Bans  

Gasoline and Diesel Fuel Update (EIA)

Status and Impact of State MTBE Bans Status and Impact of State MTBE Bans Background As a result of the Clean Air Act Amendments of 1990 (CAAA90), the year-round use of reformulated gasoline (RFG) has been required in cities with the worst smog problems since 1995 (Figure 1). One of the requirements of RFG specified by CAAA90 is a 2- percent oxygen requirement, which is met by blending "oxygenates," 1 including methyl tertiary butyl ether (MTBE) and ethanol, into the gasoline. MTBE is the oxygenate used in almost all RFG outside of the Midwest. Ethanol is currently used in the Midwest as an oxygenate in RFG and as an octane booster and volume extender in conventional gasoline. Several years ago, MTBE was detected in water supplies scattered throughout the country, but predominantly in areas using RFG. MTBE from RFG was apparently

482

July 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. 4. June 20 - 21. Hosted HAMMER to develop Radworker Reciprocity Program Checklist. 5. July 10-11. HSS Focus Group Training Working Group and Subcommittee meetings at NTC. Upcoming Meetings: Boardman meeting with HAMMER week of July 29.

483

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

484

September 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's Exchange in Oak Ridge. 2. May 8-9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker pilot. Entities visited included ORISE, Y-12, DOE TRU Project, and local labor entities. 3. June 19-20. Participated with Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in attendance) at a DOE M&O contractor led Learning/Training Workshop. - Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. - Serving this group as data repository and communications hub for efforts to standardize General Employee Radiation Training (GERT) within DOE. - Briefed the complex wide Radworker reciprocity concept finding interest and

485

User Agreement and Proprietary Account Status  

NLE Websites -- All DOE Office Websites (Extended Search)

User Agreement and Proprietary Account Status (04-Oct-2013) User Agreement and Proprietary Account Status (04-Oct-2013) Listed below are the 562 institutions that have signed APS User Agreements as financially contributing CAT members (indicated by CAT acronyms) and/or as non-members (indicated by "GU") as of (04-Oct-2013). A CAT Agreement covers users' activities at that CAT's beam lines; a GU Agreement covers users' activities at any APS beam line. All listed Agreements are nonproprietary unless otherwise noted. A superscript p indicates that a proprietary User Account has also been established. If you are not an ANL employee, a User Agreement signed by your home institution is a prerequisite for hands-on work at the APS. If your institution is not listed below (or if your institution is listed but a

486

Smart Grid Status and Metrics Report Appendices  

SciTech Connect

A smart grid uses digital power control and communication technology to improve the reliability, security, flexibility, and efficiency of the electric system, from large generation through the delivery systems to electricity consumers and a growing number of distributed generation and storage resources. To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. The Smart Grid Status and Metrics Report defines and examines 21 metrics that collectively provide insight into the grids capacity to embody these characteristics. This appendix presents papers covering each of the 21 metrics identified in Section 2.1 of the Smart Grid Status and Metrics Report. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone.

Balducci, Patrick J.; Antonopoulos, Chrissi A.; Clements, Samuel L.; Gorrissen, Willy J.; Kirkham, Harold; Ruiz, Kathleen A.; Smith, David L.; Weimar, Mark R.; Gardner, Chris; Varney, Jeff

2014-07-01T23:59:59.000Z

487

Fossil energy waste management. Technology status report  

SciTech Connect

This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

Bossart, S.J.; Newman, D.A.

1995-02-01T23:59:59.000Z

488

Alternative Fuels Data Center: Status Update: Clarification of Ethanol  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Clarification of Ethanol Certification Limits for Legacy Equipment Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Delicious Rank Alternative Fuels Data Center: Status Update: Clarification of

489

Outreach and Collaboration Program Status and Accomplishments 2008-2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Status and Accomplishments Program Status and Accomplishments 2008-2009 Outreach and Collaboration Program Status and Accomplishments 2008-2009 Outreach and Collaboration has helped HSS expand the DOE's sphere of communication and influence through broad-based dialogues, cultivating productive interagency relationships, and collaborative overtures to external entities - public and private alike - whose interests and goals align with HSS and DOE mission. This status report highlights the characteristics and accomplishments of the four outreach and collaboration programs, each of which exists to support and sustain the DOE mission of "Discovering the solutions topower and secure America's future". Outreach and Collaboration Program Status and Accomplishments 2008-2009 More Documents & Publications

490

Natural Gas Vehicles: Status, Barriers, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

ESD/10-4 ESD/10-4 Natural Gas Vehicles: Status, Barriers, and Opportunities Energy Systems Division About Argonne National Laboratory Argonne is a U.S. Department of Energy laboratory managed by UChicago Argonne, LLC under contract DE-AC02-06CH11357. The Laboratory's main facility is outside Chicago, at 9700 South Cass Avenue, Argonne, Illinois 60439. For information about Argonne and its pioneering science and technology programs, see www.anl.gov.

491

Status of solar assisted desalination: A review  

Science Journals Connector (OSTI)

The application of solar assisted desalination is expanding impressively during the last years, hence an overview of this evolution is attempted. The various solar devices, for the conversion of the sun's energy onto heat or electric power are described with emphasis to their application in water desalination processes. The status of the solar assisted desalination as developed the last eight years and the installed plants in commercial or semi-commercial size as well as some plant under development are summarized.

E.-E Delyannis

1987-01-01T23:59:59.000Z

492

Smart Grid Status and Metrics Report  

SciTech Connect

To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. It measures 21 metrics to provide insight into the grids capacity to embody these characteristics. This report looks across a spectrum of smart grid concerns to measure the status of smart grid deployment and impacts.

Balducci, Patrick J.; Weimar, Mark R.; Kirkham, Harold

2014-07-01T23:59:59.000Z

493

Non-metric gravity: A status report  

E-Print Network (OSTI)

We review the status of a certain (infinite) class of four-dimensional generally covariant theories propagating two degrees of freedom that are formulated without any direct mention of the metric. General relativity itself (in its Plebanski formulation) belongs to the class, so these theories are examples of modified gravity. We summarize the current understanding of the nature of the modification, of the renormalizability properties of these theories, of their coupling to matter fields, and describe some of their physical properties.

Kirill Krasnov

2007-11-05T23:59:59.000Z

494

Status Update: Closing Rocky Flats by 2006  

SciTech Connect

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

495

Propane Vehicles: Status, Challenges, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

Propane Vehicles: Propane Vehicles: Status, Challenges, and Opportunities ANL/ESD/10-2 Energy Systems Division Availability of This Report This report is available, at no cost, at http://www.osti.gov/bridge. It is also available on paper to the U.S. Department of Energy and its contractors, for a processing fee, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62

496

Refurbish power supply/distribution system, Phase 2, Y-12 Plant, Oak Ridge. Progress status report number 51  

SciTech Connect

This is a report on the phase 2 of refurbishing power supply/distribution system at Y-12 Plant, Oak Ridge, TN. The report topics include accomplishments by work breakdown structure (WBS) identifier, identification of items issued and items received, past due items, items requested, a milestone schedule by WBS and including a drawing list showing percent complete, and conference summaries.

NONE

1995-11-30T23:59:59.000Z

497

An analysis of repository waste-handling operations  

SciTech Connect

This report has been prepared to document the operational analysis of waste-handling facilities at a geologic repository for high-level nuclear waste. The site currently under investigation for the geologic repository is located at Yucca Mountain, Nye County, Nevada. The repository waste-handling operations have been identified and analyzed for the year 2011, a steady-state year during which the repository receives spent nuclear fuel containing the equivalent of 3000 metric tons of uranium (MTU) and defense high-level waste containing the equivalent of 400 MTU. As a result of this analysis, it has been determined that the waste-handling facilities are adequate to receive, prepare, store, and emplace the projected quantity of waste on an annual basis. In addition, several areas have been identified where additional work is required. The recommendations for future work have been divided into three categories: items that affect the total waste management system, operations within the repository boundary, and the methodology used to perform operational analyses for repository designs. 7 refs., 48 figs., 11 tabs.

Dennis, A.W.

1990-09-01T23:59:59.000Z

498

Alternative Fuels Data Center: Status Update: E85 Dispenser System  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

E85 E85 Dispenser System Certified (June 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Google Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Delicious Rank Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Digg Find More places to share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on AddThis.com... Status Update: E85 Dispenser System Certified (June 2010)

499

Alternative Fuels Data Center: Status Update: Requirements Have Not Changed  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Requirements Have Not Changed (June 2008) to someone by E-mail Requirements Have Not Changed (June 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Delicious Rank Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Digg Find More places to share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on AddThis.com... Status Update: Requirements Have Not Changed (June 2008)

500

Operations Information for Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Information for Studies Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP total customer loads for Fiscal Year 2009 (Oct, 2008-Sept, 2009) FY2010 Load Information (pdf) SLIP total customer loads for Fiscal Year 2010 (Oct, 2009-Sept, 2010) FY2011 Load Information (pdf) SLIP total customer loads for Fiscal Year 2011 (Oct, 2010-Sept, 2011) FY2012 Load Information (pdf) SLIP total customer loads for Fiscal Year 2012 (Oct, 2011-Sept, 2012) FY2013 Load Information (pdf) SLIP total customer loads for Fiscal Year 2013 (Oct, 2012-Sept, 2013) CRSP Projected Power Releases From USBR (Excel) The most recent file of projected future power releases from CRSP Dams, median projection