Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Air Emissions Operating Permit Regulations for the Purposes of...  

Broader source: Energy.gov (indexed) [DOE]

Regulations Provider Department of Environmental Quality The Air Emissions Operating Permit Regulations for the Purpose of Title V of the Federal Clean Air Act make the state...

2

Regulations of the Arkansas Operating Air Permit Program (Arkansas)  

Broader source: Energy.gov [DOE]

The Regulations of the Arkansas Air Operating Program are adopted in accordance with the provisions of Part UU of the Arkansas Water and Air Pollution Control Act, Arkansas Code Annotated 8-4-101,...

3

Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)  

Broader source: Energy.gov [DOE]

The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

4

Operating Permits (New Jersey)  

Broader source: Energy.gov [DOE]

The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure...

5

Wastewater Construction and Operation Permits (Iowa)  

Broader source: Energy.gov [DOE]

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

6

Water Pollution Control Permit Regulations (Vermont)  

Broader source: Energy.gov [DOE]

These regulations outline the permits and permitting processes for point discharges to surface waters and outline the monitoring and reporting requirements.

7

Hanford Site air operating permit application  

SciTech Connect (OSTI)

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

8

Develop an effective Title V operating permit  

SciTech Connect (OSTI)

Under Title V of the 1990 Clean Air Act Amendments (CAAA), thousands of industrial and government facilities are required to apply for a comprehensive operating permit that addresses all the emission sources at a site and the CAA regulations that apply to them. The new permitting requirements apply to major sources only--although there are several definitions of a major source under the Amended Act. Because Title V applicability is based on potential to emit (PTE) rather than actual emissions, even small and medium sources may initially be subject to this program. Unlike other regulations, Title V puts the burden of demonstrating continuous compliance on source owners and operators. Careful attention to detail is necessary during the application process because the Title V permit is inherently an enforcement fool for the EPA and the general public. Noncompliance can lead to citizen suits and fines up to $25,000 per day. Therefore, it is critical to negotiate an operating permit that does not adversely impact current operations yet provides flexibility for future modifications. Each state and local agency has its own application forms and regulatory interpretations. Areas of complexity include the classification of emission units, the approach for the PTE calculation, the separation of federal and state-enforceable requirements, and the relationship between Title V and other CAAA titles. This article summarizes some lessons learned based upon experiences in various states. (It does not attempt to resolve program uncertainties among jurisdictions.) The practical strategies presented can be used for developing (or modifying) Title V applications as well as during permit negotiations.

Chadha, N.

1997-01-01T23:59:59.000Z

9

State Water Permit Regulation (Arkansas)  

Broader source: Energy.gov [DOE]

It is the purpose of this regulation to adopt standards applicable to the storage, discharge, or disposal of any waste which, if unregulated, will cause pollution of waters of the state or result...

10

Model operating permits for natural gas processing plants  

SciTech Connect (OSTI)

Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

Arend, C. [Hydro-Search, Inc., Houston, TX (United States)

1995-12-31T23:59:59.000Z

11

Abatement of Air Pollution: Permit to Construct and Operate Stationary...  

Broader source: Energy.gov (indexed) [DOE]

Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements,...

12

Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations and Water Quality Certification (Mississippi)  

Broader source: Energy.gov [DOE]

The Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations...

13

Operating Permits and Emission Fees (New Mexico)  

Broader source: Energy.gov [DOE]

The New Mexico Environment Department's Air Quality Bureau processes permit applications for industries that emit pollutants to the air. The Permitting Section consists of three units, the Minor...

14

Regulations and Permits Related to Dams (Vermont)  

Broader source: Energy.gov [DOE]

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

15

PERMIT FOR WELDING AND CUTTING OPERATIONS INSTRUCTIONS: This permit must be completed for all operations involving open  

E-Print Network [OSTI]

PERMIT FOR WELDING AND CUTTING OPERATIONS INSTRUCTIONS: This permit must be completed for all/Area: Description of Work to be Performed: (check where appropriate) Welding Cutting Soldering Burning Type OF ACCIDENTAL FIRES DUE TO WELDING OR CUTTING OPERATIONS 1: Do not perform cutting or welding work where an open

Papautsky, Ian

16

Optimizing operational flexibility and enforcement liability in Title V permits  

SciTech Connect (OSTI)

Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

McCann, G.T. [Rust Environment and Infrastructure Inc., Greenville, SC (United States)

1997-12-31T23:59:59.000Z

17

Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program  

SciTech Connect (OSTI)

Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

Goldstein, D.R.; Cressman, A.W.

1999-07-01T23:59:59.000Z

18

Permits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements into a single, comprehensive...

19

Permits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven AshbyDepartment ofGE'sOptimizationUSING CRonOther Permits

20

Louisiana Title V General Permits  

SciTech Connect (OSTI)

Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

Boyer, B.E.; Neal, T.L.

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Water Permits (Louisiana)  

Broader source: Energy.gov [DOE]

The Water Permits Division authorizes permits administered under the Water Quality Regulations. Louisiana's Water Quality Regulations require permits for the discharge of pollutants from any point...

22

Title V Operation Permit Application Webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd JumpOperations Jump to:National Environmental Policy Act Jump

23

WAC - 173-401 Operating Permit Regulation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS data Jump to: navigation, searchVycon IncIncWAC - 173-401

24

Method for reducing fuel cell output voltage to permit low power operation  

DOE Patents [OSTI]

Fuel cell performance is degraded by recycling a portion of the cathode exhaust through the cells and, if necessary, also reducing the total air flow to the cells for the purpose of permitting operation below a power level which would otherwise result in excessive voltage.

Reiser, Carl A. (Glastonbury, CT); Landau, Michael B. (West Hartford, CT)

1980-01-01T23:59:59.000Z

25

Rules and Regulations for Hazardous Waste Management (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations establish permitting and operational requirements for hazardous waste facilities. They are designed to minimize...

26

An operational analysis of protected-permitted lead-lag left-turn phasing  

E-Print Network [OSTI]

Chair of Advisory Committee: Dr. Daniel B. Fambro This thesis documents an operational analysis of a special type of protected- permitted lead-lag left-turn phasing sequence developed and used by traffic engineers in Dallas, Texas. This phasing, known... as the Dallas phasing, does not follow existing standards for left-turn phasing set forth in the Manual for Uniform Trajfic Control Devices (MUTCD). The objective of this research was to determine whether existing left-turn models can be used to analyze...

Gaston, Gilmer D

2012-06-07T23:59:59.000Z

27

Hazardous Waste Transporter Permits (Connecticut)  

Broader source: Energy.gov [DOE]

Transportation of hazardous wastes into or through the State of Connecticut requires a permit. Some exceptions apply. The regulations provide information about obtaining permits and other permit...

28

Resource Management Services: Water Regulation, Part 600: Applications for Licenses and Preliminary Permits Under the Water Power Act (New York)  

Broader source: Energy.gov [DOE]

These regulations provide instructions for applications proposing the construction, repair, or operation of hydropower sources. Applications are reviewed by the Water Power and Control Commission.

29

Permit Program Regulating Discharge of Nondomestic Wastewater into a POTW (Ohio)  

Broader source: Energy.gov [DOE]

Any significant industrial user is required to apply for and obtain an individual indirect discharge permit if they discharge water or waste into a publicly owned treatment works.

30

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site  

SciTech Connect (OSTI)

The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325

NSTec Environmental Programs

2010-09-14T23:59:59.000Z

31

Nebraska Air Quality Regulations (Nebraska)  

Broader source: Energy.gov [DOE]

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to ambient air quality standards, pollution source operating permits, emissions reporting,...

32

Annual Hanford Site Environmental Permitting status report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

33

Federal Environmental Regulations Impacting Hydrocarbon Exploration, Drilling, and Production Operations  

SciTech Connect (OSTI)

Waste handling and disposal from hydrocarbon exploration, drilling, and production are regulated by the US Environmental Protection Agency (EPA) through federal and state regulations and/or through implementation of federal regulations. Some wastes generated in these operations are exempt under the Resource Conservation and Recovery Act (RCRA) but are not exempt under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Superfund Amendments and Reauthorization Act (SARA), and other federal environmental laws. Exempt wastes remain exempt only if they are not mixed with hazardous wastes or hazardous substances. Once mixture occurs, the waste must be disposed as a hazardous material in an approved hazardous waste disposal facility. Before the Clean Air Act as amended in 1990, air emissions from production, storage, steam generation, and compression facilities associated with hydrocarbon exploration, drilling, and production industry were not regulated. A critical proposed regulatory change which will significantly effect Class II injection wells for disposal of produced brine and injection for enhanced oil recovery is imminent. Federal regulations affecting hydrocarbon exploration, drilling and production, proposed EPA regulatory changes, and a recent significant US Court of Appeals decision are covered in this report. It appears that this industry will, in the future, fall under more stringent environmental regulations leading to increased costs for operators.

Carroll, Herbert B.; Johnson, William I.

1999-04-27T23:59:59.000Z

34

Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities  

SciTech Connect (OSTI)

Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

1998-12-31T23:59:59.000Z

35

Industrial Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Protection Obeying Environmental Laws Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the...

36

Solid Waste Regulation No. 8- Solid Waste Composting Facilities (Rhode Island)  

Broader source: Energy.gov [DOE]

Facilities which compost putrescible waste and/or leaf and yard waste are subject to these regulations. The regulations establish permitting, registration, and operational requirements for...

37

Title 43 CFR 3271 Utilization Operations: Getting a Permit | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd JumpOperations Jump to: navigation, search OpenEI

38

Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings  

SciTech Connect (OSTI)

Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

1995-12-31T23:59:59.000Z

39

RCRA, superfund and EPCRA hotline training module. Introduction to: Permits and interim status (40 cfr part 270) updated July 1996  

SciTech Connect (OSTI)

Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.

NONE

1996-07-01T23:59:59.000Z

40

Air Emissions Operating Permit Regulations for the Purposes of Title V of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe Office ofReportingEnergyRetrospective Plan42.2 (April 2012)the

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Title 40 Code of Federal Regulations Part 71 Federal Operating Permit  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump JumpAl.,Information EPASites for Dredged| Open

42

Stormwater Permits (Vermont)  

Broader source: Energy.gov [DOE]

Stormwater permits are required for the construction of a new generation facility, the reconstruction or expansion of a facility, the operation of a generation facility which discharges stormwater...

43

Permit Fees for Hazardous Waste Material Management (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

44

Permitting of Consumptive Uses of Water (Florida)  

Broader source: Energy.gov [DOE]

Local water management districts are required to establish programs and regulations to provide for the permitting of consumptive uses of water. Such permitting programs are subject to the...

45

TPDES General Permit No. TXR150000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

individual permit. This permit does not authorize the discharge or land disposal of any wastewater from concrete batch plants at regulated construction sites. Authorization for...

46

Storm Water Discharge Permits (Wisconsin)  

Broader source: Energy.gov [DOE]

Wisconsin's storm water runoff regulations include permitting requirements for construction sites and industrial facilities, including those processing or extracting coal or gas. The purpose of the...

47

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

48

Operation of buck regulator with ultra-low input voltage  

E-Print Network [OSTI]

Based on the LTC3621 and LTC3624, the designed buck regulator proposed in this thesis aims to lower the allowed input voltage and increase efficiency compared to the original part without making significant changes to ...

Harris, Cory Angelo

2014-01-01T23:59:59.000Z

49

Partial List of Laws, Regulations and Guidelines Bearing on the Operation of Biological Research Labs  

E-Print Network [OSTI]

Partial List of Laws, Regulations and Guidelines Bearing on the Operation of Biological Research Chemicals in the Laboratory 40 CFR 260 - 262; RCRA ­ Hazardous Waste Management, Lists and Generator Rule Select Agent Regulations, 49 CFR 171-180-Transportation Additional CFR's not indicated above 21

Oliver, Douglas L.

50

Hanford Site Air Operating Permit Application Supplemental Information [Sec 1 Thru 5] Vol 1 Thru 3 Appendices A Thru C  

SciTech Connect (OSTI)

This report documents radionuclide air emissions from the Hanford Site in 1998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H: ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246247, Radiation Protection - Air Emissions. The federal regulations in 40 CFR 61, Subpart H, require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1998 from Hanford Site point sources was 1.3 E-02 mrem (1.3 E-04 mSv). which is 0.13 percent of the federal standard. Chapter 246-247 of the Washington Administrative Code (WAC) requires the reporting of radionuclide emissions from all Department of Energy Hanford Site sources. The state has adopted into these regulations the 40 CFR 61 standard of 10 mrem/yr EDE. The EDE to the MEI attributable to diffuse and fugitive radionuclide air emissions from the Hanford Site in 1998 was 2.5 E-02 mrem (2.S E-04 mSv). This dose added to the dose from point sources gives a total for all sources of 3.8 E-02 mrem/yr (3.8 E-04 mSv) EDE. which is 0.38 percent of the 10 mrem/yr standard. An unplanned release on August 26, 1998, in the 300 Area of the Hanford Site resulted in a potential dose of 4.1 E-02 mrem to a hypothetical individual at the nearest point of public access to that area. This hypothetical individual was not the MEI since the wind direction on the day of the release was away from the MEI residence. The potential dose from the unplanned event was similar in magnitude to that from routine releases during 1998. Were the release from this unplanned event combined with routine releases, the total dose would be less than 1 percent of the 10 mrem/yr standard.

CURN, B.L.

2000-05-01T23:59:59.000Z

51

Safety First Safety Last Safety Always OSHA has developed extensive regulations detailing operator  

E-Print Network [OSTI]

Safety First Safety Last Safety Always OSHA has developed extensive regulations detailing operator Operation Safety Tip #3 Chance takers are accident makers. #12;Additional Information for Presenters Review the information provided on the reverse side of this safety tip sheet. Please refrain from reading the information

Minnesota, University of

52

Chapter 38 Hazardous Waste Permitting Process (Kentucky)  

Broader source: Energy.gov [DOE]

This administrative regulation establishes the general provisions for storage, treatment, recycling, or disposal of hazardous waste. It provides information about permits and specific requirements...

53

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site  

SciTech Connect (OSTI)

The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.

NSTec Environmental Programs

2010-10-04T23:59:59.000Z

54

Carbon now real factor in denying permits to coal-based generation  

SciTech Connect (OSTI)

Concerns about global climate change and uncertainties about the potential cost of carbon regulation have increased the odds that applications to build coal-fired plants will be denied. In Kansas the coal industry was stunned by the denial of an air-quality permit for a project because of concerns about global warming. It was the first time any official anywhere had invoked greenhouse gases as the reason for denying an operating permit for a proposed fossil-fueled plant.

NONE

2009-01-15T23:59:59.000Z

55

Microsoft Word - Environmental Permits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Permits July 16, 2012 Department of Energy PermitsAgreements Issuing Agency Kentucky Pollutant Discharge Elimination System Kentucky Division of Water Solid Waste -...

56

Hanford facility dangerous waste permit application, PUREX storage tunnels  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997.

Price, S.M.

1997-09-08T23:59:59.000Z

57

Annual Hanford Site Environmental Permitting Status Report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

HOMAN, N.A.

2000-10-01T23:59:59.000Z

58

Experiment Hazard Class 15.2 - USDA Soil Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

shipment, and disposal of regulated soil samples. A copy of the current APS USDA Soil Permit must accompany all samples. A copy of the home institution's soil permit is required...

59

Environmental Permit Application Background Statement (Delaware)  

Broader source: Energy.gov [DOE]

The purpose of Chapter 79 of Delaware Title 7 is to ensure that the State has adequate information about the background of applicants or regulated parties for the purposes of processing permits and...

60

Regulatory and Permitting Issues  

SciTech Connect (OSTI)

As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

Larry Myer

2005-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Presidential Permits | Department of Energy  

Energy Savers [EERE]

Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits - Canada...

62

Safety aspects related to the operation of the Cabril L/ILW disposal facility  

SciTech Connect (OSTI)

In October 1992 the Spanish Ministry of Industry granted the operating permit to the Centro de Almacenamiento de El Cabril (C.A. El Cabril). The Annex 1 to this permit contains the limits and conditions related to safety and to radiological health protection, set by nuclear regulatory authority, the Consejo de Seguridad Nuclear (CSN). The main aspects of the operation regulated in the permit as well as their technical basis and practical meaning are discussed in this paper.

Ruiz, M.C. [Consejo de Seguridad Nuclear, Madrid (Spain); Alonso, J.A. [ENRESA, Madrid (Spain). Safety and Licensing Dept.

1993-12-31T23:59:59.000Z

63

Forest Road Building Regulations  

Broader source: Energy.gov [DOE]

The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading...

64

Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation Chapter 52, entitled Air Quality: Permits, Registrations, and Prohibitory Rules, is promulgated under the authority of the Division of Air Quality within the...

65

General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe permit and facility requirements for facilities which discharge wastewater. Facility construction, expansion, alteration, production increases, or process modifications...

66

Solar Permitting Law (Oregon)  

Broader source: Energy.gov [DOE]

With the passage of HB 3516 in June 2011, solar permit application approval is a "ministerial function", provided a system meets certain guidelines. To qualify for this simplified permitting...

67

Solar Construction Permitting Standards  

Broader source: Energy.gov [DOE]

Owners of solar photovoltaic (PV) systems and solar water heating systems in Arizona are required to obtain a building permit before their systems may be installed. Permits are handled at the...

68

DISCOUNTED EVENT PERMIT REQUEST  

E-Print Network [OSTI]

DISCOUNTED EVENT PERMIT REQUEST Discounted daily parking rates are available for CSM events where or the daily scratch off permits: COMMUTER LOTS: $3.00 / day GENERAL LOTS: $4.00 / day Please e-mail or drop

69

Solar Construction Permitting Standards  

Broader source: Energy.gov [DOE]

Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the...

70

Washington Environmental Permit Handbook - Air Operating Permit | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS dataIndiana:Coop Inc Place: Vermont ServiceEnergy

71

Idaho Application for Permit to Construct Modify or Maintain...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- RegulationRegulation: Idaho Application for Permit to Construct Modify or Maintain an Injection Well - Form 42-39-1Legal Published NA...

72

Application for Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site  

SciTech Connect (OSTI)

The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter.

NSTec Environmental Management

2007-11-01T23:59:59.000Z

73

First Commercial US Mixed Waste Vitrification Facility: Permits, Readiness Reviews, and Delisting of Final Wasteform  

SciTech Connect (OSTI)

Westinghouse Savannah River Co. (WSRC) contracted GTS Duratek (Duratek) to construct and operate the first commercial vitrification facility to treat an F-006 mixed (radioactive/hazardous) waste in the United States. The permits were prepared and submitted to the South Carolina state regulators by WSRC - based on a detailed design by Duratek. Readiness Assessments were conducted by WSRC and Duratek at each major phase of the operation (sludge transfer, construction, cold and radioactive operations, and a major restart) and approved by the Savannah River Department of Energy prior to proceeding. WSRC prepared the first `Upfront Delisting` petition for a vitrified mixed waste. Lessons learned with respect to the permit strategy, operational assessments, and delisting from this `privatization` project will be discussed.

Pickett, J.B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Norford, S.W.; Diener, G.A.

1998-06-01T23:59:59.000Z

74

CCS Project Permit Acquisition Protocols  

SciTech Connect (OSTI)

Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

2013-06-30T23:59:59.000Z

75

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct, operate and...

76

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application from Soule Hydro to construct, operate...

77

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

division of ALLETE, Inc., has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the...

78

Application for Presidential Permit OE Docket No. PP-334 Energia...  

Broader source: Energy.gov (indexed) [DOE]

DOE announces its decision to issue a Presidential Permit to Energia Sierra Juarez U.S, Transmission, LLC (ESJ) to construct, operate and maintain electric transmission facilities...

79

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

The Department of Energy (DOE) announces its decision to issue a Presidential permit to Champlain Hudson Power Express, Inc. (CHPEI), to construct, operate, maintain, and connect...

80

Amended Application for Presidential Permit OE Docket No. PP...  

Broader source: Energy.gov (indexed) [DOE]

Northern Transmission Line has submitted an amended application for a Presidential Permit to construct, operate, maintain and connect an electric transmission line across the...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

hereby applies to the United States Department of Energy (DOE) for a Presidential Permit authorizing the construction, connection, operation, and maintenance of facilities for...

82

A model-based approach to regulating electricity distribution under new operating conditions  

E-Print Network [OSTI]

New technologies such as distributed generation and electric vehicles are connecting to the electricity distribution grid, a regulated natural monopoly. Existing regulatory schemes were not designed for these new technologies ...

Yap, Xiang Ling

2012-01-01T23:59:59.000Z

83

General Air Permits (Louisiana)  

Broader source: Energy.gov [DOE]

Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any...

84

Storm Water Individual Permit.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

information meeting to discuss the biannual update on the NPDES Storm Water Individual Permit. Wednesday, January 22, 2014 5:30 p.m. Cities of Gold Conference Center 10 Cities of...

85

Water Use Permitting (Wisconsin)  

Broader source: Energy.gov [DOE]

Withdrawers in the Great Lakes Basin who withdraw water in quantities that average 100,000 gallons per day or more in any 30-day period are required to get a water use permit. Two types of water...

86

Wind Energy Permitting Standards  

Broader source: Energy.gov [DOE]

All wind facilities larger than 0.5 megawatts (MW) that begin construction after July 1, 2010, must obtain a permit from any county in which the facility is located. Facilities must also obtain...

87

Direct Discharge Permit (Vermont)  

Broader source: Energy.gov [DOE]

A direct discharge permit is required if a project involves the discharge of pollutants to state waters. For generation purposes, this involves the withdrawal of surface water for cooling purposes...

88

33 CFR 322: Permits for Structures or Work in or Affecting Navigable...  

Open Energy Info (EERE)

to library Legal Document- RegulationRegulation: 33 CFR 322: Permits for Structures or Work in or Affecting Navigable Waters of the United StatesLegal Abstract These regulations...

89

Hanford Facility RCRA permit handbook  

SciTech Connect (OSTI)

Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

NONE

1996-03-01T23:59:59.000Z

90

Tidal Wetlands Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

Most activities occurring in or near tidal wetlands are regulated, and this section contains information on such activities and required permit applications for proposed activities. Applications...

91

Nuclear Regulation (Montana)  

Broader source: Energy.gov [DOE]

This statute establishes a regulatory program for sources of ionizing radiation, to be administered by the Montana Department of Health and Human Services. These regulations address permitting and...

92

Negotiating Title V and non-Title V permits  

SciTech Connect (OSTI)

The Title V Operating Permits program has been extended over many more years than originally anticipated when the 1990 Clean Air Act Amendments were first legislated. In fact, the regulatory program is still being refined even as facilities complete and submit their Title V permit applications. Likewise, it is clear that the agency review of the Title V permit applications will probably take considerably longer than originally anticipated. Finally, when the agency does complete the review, it is equally clear that there will need to be a significant amount of negotiating on the part of the facility to arrive at a simplified permit that is operationally feasible. This paper presents a number of suggestions for what the facility should be doing between the time the permit application is first submitted and the agency responds with a draft permit. The suggestions are designed to help simplify the permit and enhance flexibility. In addition, the paper presents permit negotiating techniques and points out the pitfalls that will be encountered if the facility does not take action prior to receiving the draft Title V permit. This paper suggests that the facility should internally evaluate how the permit application impacts facility operations prior to the agency doing so. It also suggests that the facility should contact the agency early and amend the permit application to take advantage of increasing regulatory flexibility. By taking these steps, and properly negotiating the permit terms and conditions; the facility will achieve a much better permit, and will hopefully be able to avoid the regulatory burdens and delays associated with re-opening the permit during the next 5 to 8 years (from the time of permit application submittal).

Erbes, R.E. [Kleinfelder, Inc., Parker, CO (United States); MacDougall, C.R. [Kleinfelder, Inc., Pleasanton, CA (United States)

1998-12-31T23:59:59.000Z

93

Montana Water Quality Permit Application, Nondegradation Authorization...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Water Quality Permit Application, Nondegradation Authorization, and Permit FeesPermitting...

94

Permit application modifications  

SciTech Connect (OSTI)

This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

NONE

1995-11-01T23:59:59.000Z

95

"Mobile money" services permit  

E-Print Network [OSTI]

"Mobile money" services permit cell phone users to send small amounts of money via text message to their friends and relatives. There are over 90 mobile money services in the world today, mainly in emergingTure oF Money october 2012 - April 2013 Muriel Ansley reynolds exhibit GAllery For the full exhibit checklist

Loudon, Catherine

96

Challenges in implementing efficient Title IV and Title V permit programs  

SciTech Connect (OSTI)

Integrating title IV acid rain and title V operating permits in an efficient manner poses numerous challenges. Federal rules and policy memos about these programs often conflict or lead to actions that are difficult to implement at best. Both permitting programs are complex and controversial, but the title IV permitting rules are particularly difficult to use and understand. Clear lines of jurisdiction for various aspects of the acid rain program are lacking in some cases, and regulators have been slow to recognize and solve these problems. There are numerous issues that have arisen during the initial stages of developing permits for title IV affected sources. Some have or are being resolved; others remain as potential impediments to efficient permitting. Utah and other western states have been working with the utility industry and US Environmental Protection Agency (EPA) to resolve these and other issues and some problems have been resolved. However, some state and industry officials feel that EPA should take the lead to conduct a series title IV implementation workshops in partnership with states and the utilities. This paper describes solutions to some common implementation problems and identifies challenges that remain to be solved.

Sprott, R. [Utah Division of Air Quality, Salt Lake City, UT (United States)

1997-12-31T23:59:59.000Z

97

Environmental Regulations and Changes in Petroleum Refining Operations (Released in the STEO June 1998)  

Reports and Publications (EIA)

Changes in domestic refining operations are identified and related to the summer Reid vapor pressure (RVP) restrictions and oxygenate blending requirements. This analysis uses published Energy Information Administration survey data and linear regression equations from the Short-Term Integrated Forecasting System (STIFS). The STIFS model is used for producing forecasts appearing in the Short-Term Energy Outlook.

1998-01-01T23:59:59.000Z

98

Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report  

SciTech Connect (OSTI)

This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission`s environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC`s review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative.

NONE

1996-05-01T23:59:59.000Z

99

WIPP Hazardous Waste Facility Permit Update  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification request that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of dollars [3]. Combining both the chap. 311 and RH TRU waste permit modification requests allows for both the regulator and DOE to expedite action on the modification requests. The Combined PMR reduces costs by having only one administrative process for both modification requests. (authors)

Kehrman, B.; Most, W. [Washington Regulatory and Environmental Services, 4021 National Parks Highway, Carlsbad, NM 88220 (United States)

2006-07-01T23:59:59.000Z

100

Solid Waste Permits (Louisiana)  

Broader source: Energy.gov [DOE]

The Louisiana Department of Environmental Quality administers the rules and regulations governing the storage, collection, processing, recovery, and reuse of solid waste protect the air,...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

E-Print Network 3.0 - air permit compliance Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Governor CALIFORNIA ENERGY COMMISSION Summary: and to the Monterey Bay Unified Air Pollution Control District (District) Permit to Operate and Title V Operating... ,...

102

Air Quality: Construction Project Air Permit Requirements  

E-Print Network [OSTI]

Air Quality: Construction Project Air Permit Requirements Department: Chemical and General Safety Program: Air Quality Owner: Program Manager Authority: ES&H Manual, Chapter 30, Air Quality1 All manager or operator must submit the completed form to the air quality program manager before the project

Wechsler, Risa H.

103

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental...

104

Permits and Easements for Construction and Related Activities on Public Lands and Waters (Iowa)  

Broader source: Energy.gov [DOE]

These rules establish procedures and regulate the evaluation and issuance of permits for construction or other related activities that alter the physical characteristics of public lands and waters...

105

Environmental regulations handbook for enhanced oil recovery  

SciTech Connect (OSTI)

This handbook is intended to assist owners and operators of enhanced oil recovery (EOR) operations in acquiring some introductory knowledge of the various state agencies, the US Environmental Protection Agency, and the many environmental laws, rules and regulations which can have jurisdiction over their permitting and compliance activities. It is a compendium of summarizations of environmental rules. It is not intended to give readers specific working details of what is required from them, nor can it be used in that manner. Readers of this handbook are encouraged to contact environmental control offices nearest to locations of interest for current regulations affecting them.

Madden, M.P. [National Inst. for Petroleum and Energy Research, Bartlesville, OK (United States); Blatchford, R.P.; Spears, R.B. [Spears and Associates, Inc., Tulsa, OK (United States)

1991-12-01T23:59:59.000Z

106

Aquifer Protection Area Land Use Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe allowable activities within aquifer protection areas, the procedure by which such areas are delineated, and relevant permit requirements. The regulations also describe...

107

Coastal Permit Program Rules (New Jersey)  

Broader source: Energy.gov [DOE]

The Coastal Permit Program Rules provide the processes for permit reviews. They include details on what activities need permits; the qualifications for general permits or permits-by-rule; the...

108

Experience in automating the Title V permit application  

SciTech Connect (OSTI)

Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

Ashcraft, T. [Warren Petroleum Co., Tulsa, OK (United States); O`Brien, J. [Process Data Control Corp., Dallas, TX (United States)

1995-12-31T23:59:59.000Z

109

Portland's Residential Solar Permitting Guide  

Broader source: Energy.gov [DOE]

This program guide outlines the application and review procedures for obtaining the necessary permit(s) to install a solar energy system for a new or existing residential building. The guide also...

110

Regulation study for the facility control system design at the Facility Operations Center at TA55  

SciTech Connect (OSTI)

NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility Operations Center (FOC) at the TA-55 Plutonium Processing and Handling Facility (PPHF). The FCS modifications will upgrade the existing electronics to provide better reliability of system functions. Changes include replacement of the FCS computers and field multiplex units which are used for transmitting systems data. Data collected at the FCS include temperature, pressure, contact closures, etc., and are used for monitoring and/or control of key systems at TA-55. Monitoring is provided for the electrical power system status, PF-4 HVAC air balance status (Static Differential pressure), HVAC fan system status, site chill water return temperature, fire system information, and radioactive constant air monitors alarm information, site compressed air pressure and other key systems used at TA-55. Control output signals are provided for PF-4 HVAC systems, and selected alarms for criticality, fire, loss of pressure in confinement systems. A detailed description of the FCS modifications is provided in Section 2.

NONE

1994-03-16T23:59:59.000Z

111

Regulatory Guidance Letter 96-01 SUBJECT: Use of Nationwide Permit Number 23 for  

E-Print Network [OSTI]

and conditions of nationwide permit 23, will require evaluation under standard permit procedures administration, operation, and maintenance. 3. Maintenance dredging and debris disposal where no new depths modification, suspension, or revocation procedures. Development of local procedures to streamline coordination

US Army Corps of Engineers

112

Regulations, Codes, and Standards (RCS) Template for California Hydrogen Dispensing Stations  

SciTech Connect (OSTI)

This report explains the Regulations, Codes, and Standards (RCS) requirements for hydrogen dispensing stations in the State of California. The reports shows the basic components of a hydrogen dispensing station in a simple schematic drawing; the permits and approvals that would typically be required for the construction and operation of a hydrogen dispensing station; and a basic permit that might be employed by an Authority Having Jurisdiction (AHJ).

Rivkin, C.; Blake, C.; Burgess, R.; Buttner, W.; Post, M.

2012-11-01T23:59:59.000Z

113

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012  

SciTech Connect (OSTI)

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

Vigil-Holterman, Luciana R. [Los Alamos National Laboratory; Lechel, Robert A. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

114

Presidential Permits - Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with...

115

Broward County Online Solar Permitting (Florida)  

Broader source: Energy.gov [DOE]

Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that...

116

Nebraska Hazardous Waste Regulations (Nebraska)  

Broader source: Energy.gov [DOE]

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to hazardous waste management, waste standards, permitting requirements, and land disposal...

117

Underground Injection Control Regulations (Kansas)  

Broader source: Energy.gov [DOE]

This article prohibits injection of hazardous or radioactive wastes into or above an underground source of drinking water, establishes permit conditions and states regulations for design,...

118

Manor Farm Permit Fees from 1 March 2014 Staff permits  

E-Print Network [OSTI]

-Site: low * £18.42 per month Car Share Permit * £82.00 per annum 2 or more University motorists sharing: Permit Type £ Notes Essential Use £201.00 per annum Car Share £80.00 per annum 2 or more University motorists sharing SOUPS Permits £8.75 for an allocation of 5 Maximum of 120 in an academic year University

Doran, Simon J.

119

Portland's Commercial Solar Permitting Guide  

Broader source: Energy.gov [DOE]

This program guide outlines the application and review procedures for obtaining the necessary permits to install a solar energy system on a new or existing commercial building.

120

Overview of the Storm Water Individual Permit.pdf  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the LANL Storm Water Individual Permit? Poster, Individual Permit for Storm Water, NPDES Permit No...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Municipal solid waste combustion: Waste-to-energy technologies, regulations, and modern facilities in USEPA Region V  

SciTech Connect (OSTI)

Table of Contents: Incinerator operations (Waste preprocessing, combustion, emissions characterization and emission control, process monitoring, heat recovery, and residual ash management); Waste-to-energy regulations (Permitting requirements and operating regulations on both state and Federal levels); Case studies of EPA Region V waste-to-energy facilities (Polk County, Minnesota; Jackson County, Michigan; La Crosse, Wisconsin; Kent County, Michigan; Elk River, Minnesota; Indianapolis, Indiana); Evaluation; and Conclusions.

Sullivan, P.M.; Hallenbeck, W.H.; Brenniman, G.R.

1993-08-01T23:59:59.000Z

122

Surface Coal Mining Regulations (Mississippi)  

Broader source: Energy.gov [DOE]

The Surface Coal Mining Regulations are a combination of permitting requirements and environmental regulations that limit how, where and when coal can be mined. It protects lands that are under...

123

Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

SciTech Connect (OSTI)

This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

Deshaye, Joyce; Bloomquist, R.Gordon

1992-12-01T23:59:59.000Z

124

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

New York Independent System Operator Inc Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System...

125

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

Electricity System Operator More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Application...

126

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

FirstEnergy Service Corporation in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain...

127

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

intervene from PJM Interconnection in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain...

128

Application for Presidential Permit OE Docket No. PP-230-3 Internation...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at teh U.S. - Canada Border....

129

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

System Operator, Inc More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Midwest...

130

Dam Safety Regulation (Mississippi)  

Broader source: Energy.gov [DOE]

The purpose of the Dam Safety Regulation is to ensure that all dams constructed in the state of Mississippi are permitted and thus do not potentially harm wildlife, water supplies and property. ...

131

Solar Construction Permitting Standards (California)  

Broader source: Energy.gov [DOE]

Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

132

Solar Permitting & Inspection Webinar Series  

Office of Energy Efficiency and Renewable Energy (EERE)

ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

133

Class 1 Permit Modification Notification  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bu il ding 1 Santa Fe, New Mexico 87505-6303 JUL 0 5 2011 Subject: Notification of a Class 1 Permit...

134

Well Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

Well permits are required for the installation of wells in private and public space. Wells are defined as any trest hole, shaft, or soil excavation created by any means including, but not limited...

135

Solar and Wind Permitting Laws  

Broader source: Energy.gov [DOE]

New Jersey has enacted three separate laws addressing local permitting practices for solar and wind energy facilities. The first deals with solar and wind facilities located in industrial-zoned...

136

Developed by: Solar Permitting Work Group  

E-Print Network [OSTI]

of Governor Edmund G. Brown Jr. California Solar Permitting Guidebook Improving Permit Review and Approval for Small Solar Photovoltaic (PV) Systems June 2012 First Edition #12;California Solar Permitting Guidebook2 California Solar Permitting Guidebook Improving Permit Review and Approval for Small Solar Photovoltaic (PV

137

E-Print Network 3.0 - air regulations update Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

permit as well... permit regulations are designed to track, record, and control air pollutants belonging to several... Standards, NAAQS", http:epa.govaircriteria.html...

138

The use of transferable permits in transport policy Charles Raux  

E-Print Network [OSTI]

geographical areas, and schemes applied to automakers for unitary vehicle emissions are also viable. Keywords), and the rapidly growing use of older in developing countries is a major source of air pollution in urbanized areas) on regulating water use, and the formalization of pollution permit markets by Montgomery (1972). According

Boyer, Edmond

139

Permit by Rule for Small Renewable Energy Projects (Virginia)  

Broader source: Energy.gov [DOE]

In 2009, the Virginia General Assembly enacted legislation directing the Virginia Department of Environmental Quality to develop regulations for the construction and operation of renewable energy...

140

Clean Air Interstate Rule (CAIR) Budget Permits  (Michigan)  

Broader source: Energy.gov [DOE]

Michigan implements the federal requirements of the Clean Air Interstate Rule (CAIR) through state regulations. Michigan's Rule 821 requires subject sources to obtain and operate in compliance with...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Liens for Oil and Gas Operations (Nebraska)  

Broader source: Energy.gov [DOE]

This section contains regulations concerning lien allowances made to operators of oil and gas operations.

142

Presidential Permit Holders - Annual Reports | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Presidential permit holders are responsible for reporting the gross amount electric energy which flows into and out of the United States over the permitted international...

143

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia)  

Broader source: Energy.gov [DOE]

The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection...

144

Recycled Water Reuse Permit Renewal Application for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond  

SciTech Connect (OSTI)

ABSTRACT This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in the initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.

No Name

2014-10-01T23:59:59.000Z

145

State Waste Discharge Permit application: 400 Area Septic System  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affects groundwater or has the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 400 Area Septic System. The influent to the system is domestic waste water. Although the 400 Area Septic System is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. Therefore, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used.

Not Available

1994-06-01T23:59:59.000Z

146

H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to...  

Open Energy Info (EERE)

H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to Perform Work on State HighwaysLegal Abstract This regulation outlines the fee schedule for the...

147

Water pollution Control Permit Fee Schedules (West Virginia)  

Broader source: Energy.gov [DOE]

This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national pollutant discharge elimination system permits issued by the...

148

Parking Options 2011/12 Reserved Permits  

E-Print Network [OSTI]

Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

149

Hanford facility dangerous waste permit application, general information portion  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

Hays, C.B.

1998-05-19T23:59:59.000Z

150

Determining enforceability of air quality requirements for the Title V permit  

SciTech Connect (OSTI)

The focus of this paper is two-fold: (1) Outline the importance, from the perspective of the regulated source, of the identification of state-only enforceable requirements versus federally enforceable requirements in a Title V permit; (2) Describe how to determine the enforceability of requirements as part of a Title V permitting study, including available tools. Contained also in this paper is a case study of enforceability determinations of requirements included in the Title V permit for an integrated pulp and paper mill. The case study is presented to provide an impetus for sources to thoroughly review their draft Title V permits to ensure correct determinations of enforceability.

Raasch, C.W.; Trinkle, J.A. [Trinity Consultants Inc., Renton, WA (United States); Radocha, D. [Boise Cascade Corp., ID (United States)

1997-12-31T23:59:59.000Z

151

Air Pollution Control Permit to Construct and Permit to Operate (Vermont) |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe Office ofReportingEnergyRetrospectiveMichiganAgriculturalDepartment

152

Construction Permits and Fees (New Mexico)  

Broader source: Energy.gov [DOE]

Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

153

Priority Permit Processing for Green Buildings  

Broader source: Energy.gov [DOE]

Hawaii Revised Statutes (HRS) §46-19.6 requires each county agency that issues building, construction, or development-related permits to establish a procedure for priority processing of permit...

154

Market Power in Pollution Permit Markets  

E-Print Network [OSTI]

As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

Montero, Juan Pablo

155

300 area TEDF permit compliance monitoring plan  

SciTech Connect (OSTI)

This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

BERNESKI, L.D.

1998-11-20T23:59:59.000Z

156

Trading quasi-emission permits  

E-Print Network [OSTI]

I study the design of environmental policies for a regulator that has incomplete information on firms' emissions and costs of production and abatement (e.g., air pollution in cities with numerous small polluting sources). ...

Montero, Juan-Pablo

2002-01-01T23:59:59.000Z

157

Sandia National Laboratories: Permitting, Inspection, and Interconnect...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tagged with: Energy * Inspecting * Interconnection * Permitting * photovoltaic * Photovoltaics * PV * Renewable Energy * solar * Solar Energy * Solar Market Transformation *...

158

State Waste Discharge Permit application: 200-E Powerhouse Ash Pit  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

159

State Waste Discharge Permit application: 200-W Powerhouse Ash Pit  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

160

The collision of Title III and Title V: A potential permitting and enforcement nightmare  

SciTech Connect (OSTI)

The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

Facca, G.; Faler, M.

1998-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Hanford facility dangerous waste permit application, general information portion  

SciTech Connect (OSTI)

The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal unit-specific Part B permit application, preclosure work plan, closure work plan, closure plan, closure/postclosure plan, or postclosure permit application documentation development, and the `Hanford Facility Resource Conservation and Recovery Act Permit` modification process. Revision 2 of the General Information Portion of the `Hanford Facility Dangerous Waste Permit Application` contains information current as of May 1, 1996. This document is a complete submittal and supersedes Revision 1.

Price, S.M., Westinghouse Hanford

1996-07-29T23:59:59.000Z

162

Federal Environmental Permitting Handbook. Environmental Guidance  

SciTech Connect (OSTI)

The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

Not Available

1991-05-01T23:59:59.000Z

163

ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits  

E-Print Network [OSTI]

ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits Visitor or Temporary Parking Permits will only be issued based on the following policies: Visitors · Visitors (Non WVU employees) to the Statler College can receive a single day visitor Parking Permit for lots 40, 41, 44

Mohaghegh, Shahab

164

PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT  

E-Print Network [OSTI]

PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT CONFINED SPACE GENERAL INFORMATION: Permit Number: Call 656-1297 Date: Equipment Number: Time Issued: Valid Until (Time, max. 8 hrs): Confined Space Description and Location: Purpose of Entry: PERMIT SPACE HAZARDS

Stuart, Steven J.

165

Air Pollution Control Regulations: No. 43 - General Permits for...  

Broader source: Energy.gov (indexed) [DOE]

This rule applies to any generator that: (a) has a heat input capacity of 350,000 Btus or more per hour or, in the case of internal combustion engines, is 50 HP or larger; and,...

166

Air Pollution Control Regulations: No. 43 - General Permits for  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe OfficeUtility Fed. Government Commercial

167

Air Pollution Control Regulations: No. 9 - Air Pollution Control Permits  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe OfficeUtility Fed. Government CommercialProgram andDetrimental to

168

Rules and Regulations for Permitting the Development and Appropriation of  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginiaRoosevelt Gardens is°andRubidoux,Rukminibai Estate

169

Rules and Regulations for Permitting the Development and Appropriation...  

Open Energy Info (EERE)

released by the State of Colorado Division of Water Resources Office of the State Engineer. Published NA Year Signed or Took Effect 2004 Legal Citation Not provided DOI Not...

170

Abatement of Air Pollution: Permit to Construct and Operate Stationary  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe Office of FossilMembershipoftheManagementHasdecDioxidePlantsDepartment

171

WSDE Air Operating Permit Application and Instructions | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS data Jump to: navigation, searchVyconWELtec

172

WSDE Air Operating Permits Register Entries webpage | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS data Jump to: navigation, searchVyconWELtecInformation

173

40 CFR 70 State Operating Permit Programs | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights, Substantive Jump to:Species |2008 | Open GREDState

174

File:OperatingPermitCheckList.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf Jump to: navigation, search File File history File

175

State waste discharge permit application, 200-E chemical drain field  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

Not Available

1994-06-01T23:59:59.000Z

176

State Waste Discharge Permit application, 183-N Backwash Discharge Pond  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

Not Available

1994-06-01T23:59:59.000Z

177

The Municipal Regional Stormwater Permit  

E-Print Network [OSTI]

· 5,000 ft2 for parking lots, restaurants, gas stations, and auto repair Green Streets Pilots (10 Professional applicators outreach Engage in pesticide regulation #12;Mercury Collect and recycle mercury-term requirements #12;PCBs Industrial inspections Building materials (caulk) pilot project Participate in Risk

178

Application for Permit to Construct Access Driveway Facilities...  

Open Energy Info (EERE)

ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Application for Permit to Construct Access Driveway...

179

State of Washington Joint Aquatic Resource Permit Application (JARPA)  

E-Print Network [OSTI]

all of the required permits, there is a greater likelihoodinform applicants on which permits they need, resulting inreduce the need for permit revisions that are currently

Manning, Sandra

2001-01-01T23:59:59.000Z

180

Multiplicity of investment equilibria when pollution permits are not tradable  

E-Print Network [OSTI]

M ONTERO , J. (2002): “Permits, standards, and technologyequilibria when pollution permits are not tradable Larryequilibria when pollution permits are not tradable Abstract

Karp, Larry

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

A study of decision making in the power plant permitting process in Appalachia. Final report  

SciTech Connect (OSTI)

Results of prior work and prevalent opinion in both private and public sectors suggested that an improved permitting process that assures better communications among decision-making bodies, utility companies and regulating agencies, and which removes inefficiencies could shorten this time lag. Four recently-permitted Appalachian power stations were selected for detailed analysis: Pleasants Power Station, Pleasants County, West Virginia; Miller Steam Plant, Jefferson County, Alabama; Cherokee Power Station, Cherokee County, South Carolina; Homer City Power Station, Indiana County, Pennsylvania.

Not Available

1981-03-01T23:59:59.000Z

182

Rules and Regulations Pertaining to the Management of Wastes (Nebraska)  

Broader source: Energy.gov [DOE]

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to waste management permits and licenses, wastewater, and the release of hazardous substances.

183

Appendix F. Air Permits Appendix F. Air Permits F-3  

E-Print Network [OSTI]

-1020-99 554701 Classified Paper Waste Incinerator 01-0020-35 554701 Brine/Methanol System 01-0020-38 554701 Brine-0106-82 034619P Flammable materials storage tank Operating K1423TSCAREPACK 73-0106-02 958435P Rad-contaminated

Pennycook, Steve

184

Guidance for writing permits for the use or disposal of sewage sludge. Draft report  

SciTech Connect (OSTI)

Section 405(d) of the Clean Water Act (CWA) directs the U.S. Environmental Protection Agency (EPA) to develop regulations containing guidelines for the use and disposal of sewage sludge. On February 19th, 1993, EPA published final regulations at 40 Code of Federal Regulations (CFR) Part 503 as the culmination of a major effort to develop technical standards in response to Section 405(d). These regulations govern three sewage sludge use and disposal practices: land application, surface disposal, and incineration. A key element in EPA's implementation of the Part 503 regulations is educating Agency and State personnel about these new requirements. Although the regulations are generally directly enforceable against all persons involved in the use and disposal of sewage sludge, they will also be implemented through permits issued to treatment works treating domestic sewage as defined in 40 CFR 122.22. Thus, the primary focus of the manual is to assist permit writers in incorporating the Part 503 requirements into permits; it serves as an update to the Guidance for Writing Case-by-Case Permit Conditions for Municipal Sewage Sludge (PB91-145508/HDM).

Not Available

1993-03-01T23:59:59.000Z

185

Permit compliance monitoring for the power generation industry  

SciTech Connect (OSTI)

The Clean Air Act Amendments (CAAA) of 1990 authorized EPA to develop regulations requiring facilities to monitor the adequacy of emission control equipment and plant operations. Furthermore, under the CAAA, EPA is required to issue regulations to require owners and operators of large industrial facilities to enhance air pollution monitoring and certify compliance with air pollution regulations. The fossil-fueled power generation industry has been targeted with the promulgation of the Acid Rain Program regulations of 40 CFR 72, and the Continuous Emissions Monitoring requirements of 40 CFR 75. The Part 75 regulations, with a few exceptions, establish requirements for monitoring, recordkeeping, and reporting of sulfur dioxide, nitrogen oxides, and carbon dioxide emissions, volumetric flow, and opacity data from affected units under the Acid Rain Program. Depending upon the type of unit and location, other applicable emission limitations may apply for particulate emissions (both total and PM-10), carbon monoxide, volatile organic compounds and sulfuric acid mist.

Macak, J.J. III [Mostardi-Platt Associates, Inc., Elmhurst, IL (United States); Platt, T.B. [Commonwealth Edison Company, Waukegan, IL (United States); Miller, S.B. [Commonwealth Edison Company, Chicago, IL (United States)

1996-12-31T23:59:59.000Z

186

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

This Annual Hanford Site Environmental Permitting Status Report (Status Report) was prepared in response to requirements prescribed in U.S. Department of Energy (DOE) Order 5400.2A, `Environmental Compliance Issue Coordination`. This Order, canceled in April 1996, required that information on existing and anticipated environmental permitting for DOE facilities be submitted (or updated) annually by October 1 of each calendar year. Although the Order was canceled, the need for this Status Report still remains. For example, the Washington State Department of Ecology`s (Ecology) Dangerous Waste Permit Application Requirements (Publication Number 95-402, June 1996), Checklist Section J, calls for current information on existing and anticipated environmental permitting. As specified in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28), this Status Report serves as the vehicle for meeting this requirement for the Hanford Facility. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by the Resource Conservation and Recovery Act (RCRA) of 1976, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) are addressed. Information on RCRA and non-RCRA permitting is included and is current as of July 31, 1996.

Thompson, S.A.

1996-10-01T23:59:59.000Z

187

Catawba County- Green Construction Permitting Incentive Program  

Broader source: Energy.gov [DOE]

Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

188

Disclosure of Permitted Communication Concerning Fossil Fuel...  

Broader source: Energy.gov (indexed) [DOE]

DOE 433 ex parte memo.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No....

189

Disclosure of Permitted Communication Concerning Regional Standards...  

Broader source: Energy.gov (indexed) [DOE]

furnacestdwaiverpolicy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major...

190

Presidential Permits and Export Authorizations - Frequently Asked...  

Broader source: Energy.gov (indexed) [DOE]

design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or...

191

Industrial Discharge Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

All businesses and government agencies discharging process wastewater to the public sewer system must report their activities to DC Water's Pretreatment Center. Wastewater discharge permits are...

192

WPCF Underground Injection Control Disposal Permit Evaluation...  

Open Energy Info (EERE)

and Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: WPCF Underground Injection Control Disposal Permit Evaluation and Fact Sheet Abstract...

193

Groundwater Discharge Permit and Registration (New Hampshire)  

Broader source: Energy.gov [DOE]

The Groundwater Discharge Permitting and Registration Program seeks to protect groundwater quality by establishing standards, criteria, and procedures for wastewater discharges. The program...

194

Colorado Air Pollution Control Division - Construction Permits...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission...

195

Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment  

SciTech Connect (OSTI)

In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designed for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.

Strachan, C.L. [Shepherd Miller, Inc., Fort Collins, CO (United States); Raabe, K.L. [Panna Maria Uranium Operations, Hobson, TX (United States)

1997-12-31T23:59:59.000Z

196

Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility  

SciTech Connect (OSTI)

The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

Not Available

1993-08-01T23:59:59.000Z

197

Utility Regulation (Indiana)  

Broader source: Energy.gov [DOE]

The Indiana Utility Regulatory Commission enforces regulations in this legislation that apply to all individuals, corporations, companies, and partnerships that may own, operate, manage, or control...

198

Pipeline Operations Program (Louisiana)  

Broader source: Energy.gov [DOE]

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

199

Library Regulations Library Regulations  

E-Print Network [OSTI]

Library Regulations 2012-13 Library Regulations UNIVERSITY OF BIRMINGHAM REGULATIONS LIBRARY REGULATIONS Preamble: The Library Regulations apply to all users of library facilities managed on behalf of the University by Library Services, and thus there are sections that apply also to non- members of the University

Birmingham, University of

200

Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

Mike Lewis

2014-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

State Waste Discharge Permit application, 100-N Sewage Lagoon  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

Not Available

1994-06-01T23:59:59.000Z

202

Hanford facility dangerous waste permit application, low-level burial grounds  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

Engelmann, R.H.

1997-08-12T23:59:59.000Z

203

State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams  

SciTech Connect (OSTI)

This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment.

Not Available

1993-12-01T23:59:59.000Z

204

Aquatic Habitat Protection Permit (Saskatchewan, Canada)  

Broader source: Energy.gov [DOE]

The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of aquatic habitat and states that a permit is required: to alter the bed, bank or boundary of any water...

205

Flood Zone Building Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

Building permits are required for new construction and development in the Special Flood Hazard Areas (SFHA). All development projects in SFHA must comply with Title 12 DCMR and Title 20 DCMR...

206

Major Source Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

The District reviews designs for new pollution sources and design modifications for existing sources. Permits are issued to allow sources to emit limited and specified amounts of pollution as...

207

State Surface Water Discharge Permits (New Hampshire)  

Broader source: Energy.gov [DOE]

Rules apply to the discharge of all pollutants from a point source to surface waters of the state. The rule does not apply to facilities that require both a state discharge permit and a federal...

208

Alteration of Terrain Permits (New Hampshire)  

Broader source: Energy.gov [DOE]

This permit is required whenever a project proposes to disturb more than 100,000 square feet of contiguous terrain (50,000 square feet if any portion of project is within protected shoreland), or...

209

Wind Energy Permitting Standards (North Carolina)  

Broader source: Energy.gov [DOE]

North Carolina has statewide permitting requirements for wind energy facilities. Any wind turbine or collection of wind turbines located within a half mile of each other with a collective rated...

210

Distributed PV Permitting and Inspection Processes  

Broader source: Energy.gov [DOE]

This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

211

City of Asheville- Building Permit Fee Waiver  

Broader source: Energy.gov [DOE]

The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

212

Regulations for the Rhode Island Pollutant Discharge Elimination System (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations aim to protect surface water from pollutant discharges. They describe allowable discharges in the state that are subject to permits, discharges which may be made without permits,...

213

Technical Demonstration of 2010 Emissions Regulations over Transient...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Demonstration of 2010 Emissions Regulations over Transient Operation Technical Demonstration of 2010 Emissions Regulations over Transient Operation Presentation given at DEER 2006,...

214

Alcohol Services Category #1 # Permit Applica2on Category #2  

E-Print Network [OSTI]

Alcohol Services Category #1 # Permit Applica2on Category #2 Category #3 If an outdoor event, a;ach UNL Police approved licensed area plan to Permit Request ADMINISTRATOR TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT

Powers, Robert

215

State Waste Discharge Permit ST-4502 Implementation Plan  

SciTech Connect (OSTI)

Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

BROWN, M.J.; LECLAIR, M.D.

2000-09-27T23:59:59.000Z

216

ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...  

Open Energy Info (EERE)

use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

217

ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...  

Open Energy Info (EERE)

use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

218

Y-12 Industrial Landfill V. Permit application modifications  

SciTech Connect (OSTI)

This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations require landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.

NONE

1995-09-01T23:59:59.000Z

219

Expedited Permitting of Grid-Scale Wind Energy Development (Maine)  

Broader source: Energy.gov [DOE]

Maine's Expedited Permitting of Grid-Scale Wind Energy Development statue provides an expedited permitting pathway for proposed wind developments in certain designated locations, known as expedited...

220

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Application for Presidential Permit OE Docket No. PP-395 Emera...  

Broader source: Energy.gov (indexed) [DOE]

to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

222

Nevada Sample Application for Permit Under Utility Environmental...  

Open Energy Info (EERE)

Sample Application for Permit Under Utility Environmental Protection Act Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

223

City and County of Denver- Solar Panel Permitting (Colorado)  

Broader source: Energy.gov [DOE]

Construction, Electrical, Plumbing and Zoning Permits* are required for Photovoltaic (PV) systems installed in the city of Denver. Denver provides same day permit review for most solar panel...

224

Taxes, Permits, and the Adoption of Abatement Technology under...  

Open Energy Info (EERE)

Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance Jump to: navigation, search Name Taxes, Permits, and the Adoption of Abatement Technology under...

225

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Addendum to Presidential Permit Letter. TDI Presidential Permit Application Addendum.pdf More Documents & Publications PP-362 Champlain Hudson Power Express, Inc. Application for...

226

Application for presidential permit OE Docket No. PP-305 Montana...  

Broader source: Energy.gov (indexed) [DOE]

Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana...

227

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Broader source: Energy.gov (indexed) [DOE]

Border. Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company More Documents & Publications Application for Presidential Permit OE Docket No....

228

Request for Information on Permitting of Transmission Lines:...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

229

U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...  

Broader source: Energy.gov (indexed) [DOE]

2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

230

AUTHORIZATION FOR PAYROLL DEDUCTION 2012-2013 PARKING PERMIT  

E-Print Network [OSTI]

________________________________________________ DATE______________________________ $267.00 (ONE PERMIT) $66.00 (MOTORCYCLE PERMIT) $267.00 (TOTAL MONTH____________ OPTION FOR MOTORCYCLE DEDUCTION--1 MONTH______________ PLEASE INCLUDE YOUR CAMPUS

Escher, Christine

231

RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: Permits and interim status (40 CFR part 270) updated as of July 1995  

SciTech Connect (OSTI)

The module presents an overview of the RCRA permitting process and the requirements that apply to treatment, storage, and disposal facilities (TSDFs) operating under interim status until a permit is issued. It lists the types of activities that do and do not require a permit. It provides CFR cites for definitions of existing hazardous waste facility and new hazardous waste facility and identifies CFR sections relevant to Part A and Part B permit information requirements and describes the difference between them. It outlines steps in the process from interim status to receipt of permit. It identifies the differences among permit modification classes, and lists the special forms of permits. It lists the permit-by-rule applications, status and eligibility requirements for interim status and the conditions for termination of interim status and lists the conditions for changes during interim status.

NONE

1995-11-01T23:59:59.000Z

232

Hanford facility dangerous waste permit application  

SciTech Connect (OSTI)

This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

none,

1991-09-18T23:59:59.000Z

233

Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report  

SciTech Connect (OSTI)

The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

Not Available

1982-09-01T23:59:59.000Z

234

Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0  

SciTech Connect (OSTI)

This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

Not Available

1992-03-01T23:59:59.000Z

235

Washington State’s Transportation Permit Efficiency and Accountability Committee (TPEAC)  

E-Print Network [OSTI]

as the Transportation Permit Efficiency and Accountability (the Transportation Permit Efficiency and Accountabilityrequired to obtain permits. Passage of the Transportation

Aberle, Barbara

2005-01-01T23:59:59.000Z

236

Hanford Facility dangerous waste permit application, general information. Revision 1  

SciTech Connect (OSTI)

The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility.

Not Available

1993-05-01T23:59:59.000Z

237

Smart grids are forcing the evolution of grid operational strategies. The variability inherent in large-scale renewable generation challenges existing regulation approaches.  

E-Print Network [OSTI]

stable, optimal operation. Wide Area Monitoring and Control (WAMC) Phasor measurement units (PMUs transformers (TCPSTs, phase angle differences), and unified power flow controllers (UPFCs, all of the aboveSmart grids are forcing the evolution of grid operational strategies. The variability inherent

Hiskens, Ian A.

238

Renewable Energy Permitting Barriers in Hawaii: Experience from the Field  

SciTech Connect (OSTI)

This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

2013-03-01T23:59:59.000Z

239

Community Charter Halibut Permit Application Page 1 of 5  

E-Print Network [OSTI]

PERMIT (CCHP) U.S. Department of Commerce NOAA National Marine Fisheries Service Alaska Region Restricted

240

Permitting of Wind Energy Facilities: A Handbook  

SciTech Connect (OSTI)

This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

NWCC Siting Work Group

2002-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

UCSF Bicycle Permit Application Transportation Services  

E-Print Network [OSTI]

UCSF Bicycle Permit Application Transportation Services 500 Parnassus Ave, Box 0240 MU- P7 Room 26 ____________________________________________________________________ ____________________________ ______________________________ ____________________________________________________________________ Street City State Zip Home Phone Number Work Phone Number Bicycle Make Color Frame Serial #Bicycle Model 1. Bicycles which are not moved for a period of 7 days or longer will be tagged for removal

Yamamoto, Keith

242

Hanford facility dangerous waste permit application, general information portion. Revision 3  

SciTech Connect (OSTI)

For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

Sonnichsen, J.C.

1997-08-21T23:59:59.000Z

243

UNIVERSITY OF WASHINGTON [DEPARTMENT NAME] HOT WORK PERMIT (For use outside of welding booths)  

E-Print Network [OSTI]

UNIVERSITY OF WASHINGTON [DEPARTMENT NAME] HOT WORK PERMIT (For use outside of welding boothsW 1032 (6/2013) WELDING/CUTTING/OPEN FLAME All welding/cutting/open flame equipment is in good repair and welding, (10 feet for other open flame operations). Combustible walls are protected. Combustible floors

Wilcock, William

244

Montana 310 Permit Database | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate Zone Subtype A. PlacesEnergy Information WaterPermit

245

Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report  

SciTech Connect (OSTI)

This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry. Objectives for 2.1.7 are the following: • To work with stakeholders to streamline the MHK regulatory permitting process. • To work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development. • To communicate research findings and directions to the MHK industry and stakeholders. • To engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which are described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning As the MHK industry works with the regulatory community and stakeholders to plan, site, permit and license MHK technologies they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under 2.1.7 is to understand these varied interests, explore mechanisms to reduce conflict, identify efficiencies, and ultimately identify pathways to reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

Geerlofs, Simon H.; Hanna, Luke A.; Judd, Chaeli R.; Blake, Kara M.

2012-09-01T23:59:59.000Z

246

Permit Types, Tiers, and Parking Privileges 2012-2013 Alr 07-01-2012 1  

E-Print Network [OSTI]

loading permit from booth. M (motorcycle permit) Motorcycle Spaces ME (Maple Avenue Complex) Perimeter

247

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT  

SciTech Connect (OSTI)

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework

none,

2008-03-26T23:59:59.000Z

248

Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

SciTech Connect (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

249

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits...  

Broader source: Energy.gov (indexed) [DOE]

0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks...

250

Hazardous Waste Facility Permit Public Comments to Community...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

covered by the permit. Please use another word for "promulgated," such as "created." This section should state that it is a ten-year permit, set to expire in November 2020. It...

251

Exclusionary manipulation of carbon permit markets: a laboratory test  

E-Print Network [OSTI]

The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

Carlén, Björn.

252

V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2.3.3.216 Addthis Related Articles U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-144:Juniper Secure Access Input Validation Flaw Permits...

253

RCRA Hazardous Waste Part A Permit Application: Instructions...  

Open Energy Info (EERE)

Part A Permit Application: Instructions and Form (EPA Form 8700-23) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit...

254

UPDES General Permit for Discharges from Construction Activities...  

Open Energy Info (EERE)

Discharges from Construction Activities (Permit No. UTRC00000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: UPDES General Permit...

255

Study of Risk Assessment Programs at Federal Agencies and Commercial Industry Related to the Conduct or Regulation of High Hazard Operations  

SciTech Connect (OSTI)

In the Department of Energy (DOE) Implementation Plan (IP) for Defense Nuclear Facilities Safety Board's Recommendation 2009-1, the DOE committed to studying the use of quantitative risk assessment methodologies at government agencies and industry. This study consisted of document reviews and interviews of senior management and risk assessment staff at six organizations. Data were collected and analyzed on risk assessment applications, risk assessment tools, and controls and infrastructure supporting the correct usage of risk assessment and risk management tools. The study found that the agencies were in different degrees of maturity in the use of risk assessment to support the analysis of high hazard operations and to support decisions related to these operations. Agencies did not share a simple, 'one size fits all' approach to tools, controls, and infrastructure needs. The agencies recognized that flexibility was warranted to allow use of risk assessment tools in a manner that is commensurate with the complexity of the application. The study also found that, even with the lack of some data, agencies application of the risk analysis structured approach could provide useful insights such as potential system vulnerabilities. This study, in combination with a companion study of risk assessment programs in the DOE Offices involved in high hazard operations, is being used to determine the nature and type of controls and infrastructure needed to support risk assessments at the DOE.

Bari, R.; Rosenbloom, S.; O'Brien, J.

2011-03-13T23:59:59.000Z

256

Innovation and Success in Solar Permitting and Inspection  

Broader source: Energy.gov [DOE]

This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects.

257

On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish)  

E-Print Network [OSTI]

This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

Lesikar, Bruce J.

2005-04-30T23:59:59.000Z

258

Standardized Permit Guidance | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland,0162112°,St. Charles isStallings,Standardized Permit

259

CSEM WP 113 Using Environmental Emissions Permit Prices to Raise  

E-Print Network [OSTI]

CSEM WP 113 Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market analyzes the extent to which the conditions in the emissions permit market for oxides of nitrogen (NOx

California at Berkeley. University of

260

U of O Retired Staff Parking Permit Application  

E-Print Network [OSTI]

U of O Retired Staff Parking Permit Application Please Print Last Name Faculty Retired Non-tenure track instructor Retired Officer of Research Type of parking permit desired (no cost for permit) Payment Method: I intend to pay immediately, in full, using cash, check, Visa orf

Cina, Jeff

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services  

E-Print Network [OSTI]

T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services Temporary Disabled Person Parking Permit Request Form Parking & Transportation Services (657) 278-3082 / Fax (657) 278-4533 Temporary Disabled Person permits will be issued after completion of Section II by Disabled Student Services

de Lijser, Peter

262

Alcohol Services Category #1 # Permit Application Category #2  

E-Print Network [OSTI]

Alcohol Services Category #1 # Permit Application Category #2 Category #3 Facility to be Used If an outdoor event, attach UNL Police approved licensed area plan to Permit Request. This individual may TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT. THE APPROVED CATERER IS RESPONSIBLE

Powers, Robert

263

State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0  

SciTech Connect (OSTI)

On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

NONE

1995-11-01T23:59:59.000Z

264

A New Concept: Use of Negotiations in the Hazardous Waste Facility Permitting Process in New Mexico  

SciTech Connect (OSTI)

This paper describes a unique negotiation process leading to authorization of the U.S. Department of Energy (DOE) to manage and dispose remote-handled (RH) transuranic (TRU) mixed wastes at the Waste Isolation Pilot Plant (WIPP). The negotiation process involved multiple entities and individuals brought together under authority of the New Mexico Environment Department (NMED) to discuss and resolve technical and facility operational issues flowing from an NMED-issued hazardous waste facility Draft Permit. The novel negotiation process resulted in numerous substantive changes to the Draft Permit, which were ultimately memorialised in a 'Draft Permit as Changed'. This paper discusses various aspects of the negotiation process, including events leading to the negotiations, regulatory basis for the negotiations, negotiation participants, and benefits of the process. (authors)

Johnson, G.J. [Washington TRU Solutions, LLC, Waste Isolation Pilot Plant, New Mexico (United States); Rose, W.M. [U.S. Department of Energy, Carlsbad Field Office, Waste Isolation Pilot Plant, New Mexico (United States); Domenici, P.V.; Hollingsworth, L. [Domenici Law Firm PC, Albuquerque, New Mexico (United States)

2007-07-01T23:59:59.000Z

265

Modeling of Particulate Matter Emissions from Agricultural Operations  

E-Print Network [OSTI]

State Air Pollution Regulation Agencies (SAPRAs) issue and enforce permits that limit particulate matter emissions from all sources including layer and broiler facilities, cattle feedyards, dairies, cotton gins, and grain elevators...

Bairy, Jnana 1988-

2013-01-02T23:59:59.000Z

266

Regulated and Unregulated Exhaust Emissions Comparison for Three Tier II Non-Road Diesel Engines Operating on Ethanol-Diesel Blends  

SciTech Connect (OSTI)

Regulated and unregulated emissions (individual hydrocarbons, ethanol, aldehydes and ketones, polynuclear aromatic hydrocarbons (PAH), nitro-PAH, and soluble organic fraction of particulate matter) were characterized in engines utilizing duplicate ISO 8178-C1 eight-mode tests and FTP smoke tests. Certification No. 2 diesel (400 ppm sulfur) and three ethanol/diesel blends, containing 7.7 percent, 10 percent, and 15 percent ethanol, respectively, were used. The three, Tier II, off-road engines were 6.8-L, 8.1-L, and 12.5-L in displacement and each had differing fuel injection system designs. It was found that smoke and particulate matter emissions decreased with increasing ethanol content. Changes to the emissions of carbon monoxide and oxides of nitrogen varied with engine design, with some increases and some decreases. As expected, increasing ethanol concentration led to higher emissions of acetaldehyde (increases ranging from 27 to 139 percent). Benzene emissions were reduced by up to 50 percent with the ethanol-blended fuels. Emissions of 1,3-butadiene were also substantially decreased, with reductions ranging from 24 to 82 percent. Isolated trends were noted for certain PAHs. There was a decrease in 1-nitropyrene with use of ethanol in all cases. Particulate phase 1-nitropyrene was reduced from 18 to 62 percent. There was also a general increase in the proportion of heavy PAHs in the particulate phase with ethanol use, and although less pronounced, a general decrease in light PAHs in the particulate phase.

Merritt, P. M.; Ulmet, V.; McCormick, R. L.; Mitchell, W. E.; Baumgard, K. J.

2005-11-01T23:59:59.000Z

267

Utility vehicle safety Operator training program  

E-Print Network [OSTI]

Utility vehicle safety Operator training program #12;Permissible use Utility Vehicles may only Utility Vehicle operator · When equipped with the "Required Equipment" · On public roadways within Drivers" · Obey all traffic regulations · Trained; update training every two years · Operate vehicles

Minnesota, University of

268

PWR core monitoring and simulation during load follow operation  

SciTech Connect (OSTI)

This paper presents a new operation core support system developed for pressurized water reactors. This system provides an enhanced understanding of the operating core with significant benefits in operational flexibility. It also permits evaluation of alternatives and specific situations that allows for enhanced operation of the unit, which provides benefits in power capability and minimizes potential operational issues.

Beard, C. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Commercial Nuclear Fuel Div.); Winter, M.; Niederer, R. (Commonwealth Edison Co., Zion, IL (USA))

1989-01-01T23:59:59.000Z

269

Permit Allocation in Emissions Trading using the Boltzmann Distribution  

E-Print Network [OSTI]

In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...

Park, Ji-Won; Isard, Walter

2011-01-01T23:59:59.000Z

270

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements  

SciTech Connect (OSTI)

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

French, Sean B [Los Alamos National Laboratory; Johns - Hughes, Kathryn W [Los Alamos National Laboratory

2011-01-21T23:59:59.000Z

271

State waste discharge permit application 400 Area secondary cooling water. Revision 2  

SciTech Connect (OSTI)

This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility.

NONE

1996-01-01T23:59:59.000Z

272

Development of a Clean Air Act Title V permit application for Argonne National Laboratory  

SciTech Connect (OSTI)

The Clean Air Act Amendments (CAAA) of 1990 instituted major changes in the way that air emission sources are regulated and permitted. Along with being a major research and development laboratory owned by the US Department of Energy, Argonne National Laboratory (ANL) is also classified as a major source of oxides of nitrogen (NO{sub x}) in the Chicago metropolitan area which has been designated by the US Environmental Protection Agency (USEPA) as severe (17) for ozone. As a major source ANL is therefore required under Title V of CAAA to apply for a federally enforceable permit for all sources of air emissions at the facility. While the ANL Boiler House represents the most significant emission source at the Laboratory, there are, nevertheless, a large number of other emission sources, some of which are currently permitted by the State of Illinois and others of which are exempt from state permitting requirements. A large number of R & D related sources are of relatively small magnitude. The ability to identify, inventory, characterize and classify all sources under the various titles of CAAA constitutes a major challenge for R & D laboratories of this size.

Barrett, G.L.

1994-06-01T23:59:59.000Z

273

Hawaii Clean Energy Initiative Permit to Cross or Enter the State...  

Open Energy Info (EERE)

Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Initiative Permit to Cross or Enter the State Energy CorridorPermitting...

274

EU-California Environmental Agreements: The Role of Trade in Emissions Permits and Escape Clauses  

E-Print Network [OSTI]

the role of trade in emissions permits and escape clauses. (agreements. Trade in emissions permits has ambiguous and inAlthough trade in emissions permits reduces the aggregate

Karp, Larry; Zhao, Jinhua

2008-01-01T23:59:59.000Z

275

When to Pollute, When to Abate? Intertemporal Permit Use in the Los Angeles NOx Market  

E-Print Network [OSTI]

such as overlapping cycles of permits, can increase theproblems of bankable permits. References Carlson, Dale A.to Abate? Intertemporal Permit Use in the Los Angeles NO x

Holland, Stephen P.; MOORE, MICHAEL R

2008-01-01T23:59:59.000Z

276

Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market  

E-Print Network [OSTI]

Environmental Emissions Permit Prices to Raise ElectricityEnvironmental Emissions Permit Prices to Raise Electricitythe conditions in the emissions permit market for oxides of

Kolstad, Jonathan; Wolak, Frank

2003-01-01T23:59:59.000Z

277

Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

NONE

1997-05-01T23:59:59.000Z

278

EIS-0463: Presidential Permit Application for Northern Pass Transmission, New Hampshire  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts from DOE’s proposed Federal action of granting a Presidential permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. The U.S. Forest Service, White Mountain National Forest, and the U.S. Army Corps of Engineers, New England District, are cooperating agencies in the preparation of this EIS.

279

Geothermal policy development program: expediting the local geothermal permitting process  

SciTech Connect (OSTI)

For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

Not Available

1981-07-01T23:59:59.000Z

280

Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

Norm Stanley

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Notice of Termination for Authorization under TPDES General Permit...  

Open Energy Info (EERE)

Termination for Authorization under TPDES General Permit (TXR150000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Notice of Termination for...

282

Innovation and Success in Solar Permitting and Inspections  

Broader source: Energy.gov (indexed) [DOE]

Webinar 2: Innovation and Success in Solar Permitting and Inspections Transcript June 26, 2013 Speaker: Courtney Kendal Slide 1: Good afternoon. My name is Courtney Kendall,...

283

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture...

284

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

border. Notice of Intervention from Dept of Agriculture.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept....

285

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Comments from Dept of Agriculture 08-28-13.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by...

286

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2013 Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project: Federal Register Notice, Volume 78, No. 146 - July 30, 2013 Application...

287

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Correction Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction...

288

Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)  

SciTech Connect (OSTI)

Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

Young, K.

2014-04-01T23:59:59.000Z

289

Application for Presidential Permit OE Docket No. PP-369 British...  

Broader source: Energy.gov (indexed) [DOE]

69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission...

290

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Peggy Wilson Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson Application from Soule Hydro to...

291

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Conservation Law Foundation, Appalachian Mountain Club, and Society for the Protection of New Hampshire Forests Application for Presidential Permit OE Docket No. PP-371 Northern...

292

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Broader source: Energy.gov (indexed) [DOE]

Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

293

Request for Information on Improving Performance of Federal Permitting...  

Broader source: Energy.gov (indexed) [DOE]

of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of...

294

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Ann Vennerbeck Application for...

295

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Transmission.pdf More Documents & Publications Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal...

296

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

PassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for...

297

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Canada Border. Identification of Preferred Alternative for Permit Amendment. PREFERREDALTERNATIVEPermitAmendmentof28Feb12.pdf More Documents & Publications PP-362 Champlain...

298

Application for presidential permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

electric transmission facilities at the U.S. - Canada Border. FINAL TDI Presidential Permit Application. January 25, 2010 More Documents & Publications EIS-0447: Draft...

299

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Courtney Kearley Application for...

300

NMDOT Application for Permit to Install Utility Facilities Within...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Motion to Intervene.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from The Weeks Lancaster Trust...

302

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Northern Trans Line.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Notice of...

303

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

lishaGrayPP-371Comment.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

304

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hayes Application for...

305

Application for Presidential Permit OE Docket No. PP-044 Northern...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-44 Northern Electric Cooperative Association More Documents &...

306

Application for Presidential Permit OE Docket No: PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

ShoemakerComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application for...

307

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

appaportPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

308

Application for presidential permit OE Docket No. PP-305 Montana...  

Broader source: Energy.gov (indexed) [DOE]

Scope Change 1 PP-305 Montana Alberta Tie LTD More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update...

309

Application for presidential permit OE Docket No. PP-334 Energia...  

Broader source: Energy.gov (indexed) [DOE]

Juarez U.S Trainsmission LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of Decision...

310

Application for Presidential Permit OE Docket No. PP-235 Sempra...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Mexico Border. Application for Presidential Permit OE Docket No. 235 Sempra Energy Resources. More Documents & Publications PP-235 Sempra...

311

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

BrownsonComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application for...

312

Application for presidential permit OE Docket No. PP-300 Maine...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-300 Maine Public Service Company More Documents & Publications PP-300...

313

Application for Presidential Permit OE Docket No. PP-299 Sea...  

Broader source: Energy.gov (indexed) [DOE]

electric transmission facilitites at the U.S. - Canada Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC More...

314

Application for Presidential Permit OE Docket No. PP-366 Twin...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-366 Twin Rivers Paper Company, Inc. More Documents & Publications...

315

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Broader source: Energy.gov (indexed) [DOE]

iceFR3886907092014.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-400 TDI-New England - New England Clean Power Link Project...

316

Application for presidential permit OE Docket No. PP-334 Baja...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC More Documents & Publications...

317

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

The Nature Conservancy.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for...

318

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Bruce Adami Application for...

319

Amended Application for Presidential Permit OE Docket No: PP...  

Broader source: Energy.gov (indexed) [DOE]

Amended Application of Northern Pass Transmission LLC for Presidential Permit Exhibit 1 - Opinion of Counsel Exhibit 2 - General Area Map of Proposed Route Exhibit 3 - Diagrams of...

320

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst Application for...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Application for Presidential Permit OE Docket No. PP-059 Central...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Mexico Border Application for Presidential Permit OE Docket No. PP-59 Central Power and Light Company (CPL) More Documents &...

322

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

border.. Federal Register Notice Vol 75 No 220. Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC More Documents & Publications...

323

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Rana Klug Application for...

324

Application for presidential permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. EIS-0447: Amended Notice of...

325

NMSLO Application for Permit to Conduct Geophysical Exploration...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Application for Permit to Conduct Geophysical Exploration on Unleased State LandsLegal Published NA Year...

326

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission: Comments from William and Michelle...

327

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

from James Kennedy.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James...

328

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lorna Rose Application for...

329

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Pass Transmission, LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder...

330

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Board of Commissioners.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal...

331

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

elMarinoPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder...

332

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Energy Savers [EERE]

Register Notice, Volume 79, No. 124, June 27, 2014 Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Notice of...

333

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Broader source: Energy.gov (indexed) [DOE]

Border: Federal Register Notice. Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company: Federal Register Notice, Volume 65, No. 183 More Documents...

334

Application for presidential permit OE Docket No. PP-305 Montana...  

Broader source: Energy.gov (indexed) [DOE]

Federal Register Notice Vol 70 No 210. Application for presidential permit OE Docket No. 305 Montana Alberta Tie Ltd More Documents & Publications PP-305 Montana Alberta Tie Ltd...

335

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

of Counsel - 20140609.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

336

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Pass WLT Filing.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

337

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

laMartinPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Elisha Gray Application...

338

Application for presidential permit OE Docket No. PP-299 Sea...  

Broader source: Energy.gov (indexed) [DOE]

at the U.S-Canada border. - Federal Register Notice Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc More...

339

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Roy Kjendal Application for...

340

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Anne Moschella Application for...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

AlicePeatmanComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application...

342

Application for presidential permit OE Docket No. PP-304 Generadora...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-304 Generadora Del Desierto SA DE CV More Documents & Publications...

343

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James...

344

Application for Presidential Permit OE Docket No. PP-257 Emera...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-257 Emera Energy Services, Inc. More Documents & Publications...

345

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

nMoulderPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Michael Marino...

346

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

KeenanComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder Application for...

347

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Canada Border. Update to Presidential Permit Letter. CHPE-USDOE-Amendment.pdf More Documents & Publications EIS-0447: Final Environmental Impact Statement Application for a...

348

Application for Presidential Permit OE Docket No. PP-334 Baja...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Mexico Border. Application for Presidental Permit OE Docket No. PP-334 Baja Wind Transmission, LLC More Documents & Publications...

349

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rtMartinPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

350

Clark County- Solar and Wind Building Permit Guides  

Broader source: Energy.gov [DOE]

Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

351

File:CDPHE Industrial Individual Wastewater Discharge Permit...  

Open Energy Info (EERE)

Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search File File history File usage Metadata File:CDPHE Industrial Individual Wastewater...

352

Application for presidential permit OE Docket No. PP-371 Northern...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to...

353

Application for a Colorado State Permit for Achaeological or...  

Open Energy Info (EERE)

Form: Application for a Colorado State Permit for Achaeological or Paleontological Work Abstract This application must be submitted and approved prior to commencing...

354

City of Portland- Streamlined Building Permits for Residential Solar Systems  

Broader source: Energy.gov [DOE]

The City of Portland's Bureau of Development Services (BDS) developed an electronic permitting process for residential solar energy system installations. With this streamlined, expedited process,...

355

Appendix F. Permits AnnualSiteEnvironmentalRepor  

E-Print Network [OSTI]

/17/2003 DOE DOE BWXT CAA Depleted Uranium Forming and Heat Transfer (Construction Permit) 950266P 11/4/1998 7

Pennycook, Steve

356

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Broader source: Energy.gov [DOE]

Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

357

WIPP Documents - Hazardous Waste Facility Permit (RCRA)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome VelenciaNewsNewsFederal Regulations 40

358

Recommended management practices for operation and closure of shallow injection wells at DOE facilities  

SciTech Connect (OSTI)

The Safe Drinking Water Act established the Underground Injection Control (UIC) program to ensure that underground injection of wastes does not endanger an underground source of drinking water. Under UIC regulations, an injection well is a hole in the ground, deeper than it is wide, that receives wastes or other fluid substances. Types of injection wells range from deep cased wells to shallow sumps, drywells, and drainfields. The report describes the five classes of UIC wells and summarizes relevant regulations for each class of wells and for the UIC program. The main focus of the report is Class IV and V shallow injection wells. Class IV wells are prohibited and should be closed when they are identified. Class V wells are generally authorized by rule, but EPA or a delegated state may require a permit for a Class V well. This report provides recommendations on sound operating and closure practices for shallow injection wells. In addition the report contains copies of several relevant EPA documents that provide additional information on well operation and closure. Another appendix contains information on the UIC programs in 21 states in which there are DOE facilities discharging to injection wells. The appendix includes the name of the responsible regulatory agency and contact person, a summary of differences between the state`s regulations and Federal regulations, and any closure guidelines for Class IV and V wells.

Not Available

1993-07-01T23:59:59.000Z

359

Safe Operating Procedure (Revised 3/11)  

E-Print Network [OSTI]

. · Disturbing less than one-acre of land, then feasible Best Management Practices must be implemented NPDES Permit Authorizing Storm Water Discharges from Construction Sites to Waters of the State protection regulations and which should trigger consultation with EHS early in the planning process. Water

Farritor, Shane

360

Linearly Exchangable Permits for the Efficient Control of Multiple Pollutants  

E-Print Network [OSTI]

PWP-019 Linearly Exchangable Permits for the Efficient Control of Multiple Pollutants James B;Linear Exchangeable Permits for the Ecient Control of Multiple Pollutants James B. Bushnell University of pollutants. Often a new polluter is required to purchase an "o-set" from an existing polluter prepared

California at Berkeley. University of

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

car_app1.doc STAFF PARKING PERMIT APPLICATION  

E-Print Network [OSTI]

and drop off points Frequency of lifts (days per week) 6. Car Sharing You can share a group permit with upcar_app1.doc STAFF PARKING PERMIT APPLICATION The information supplied on this form will allow (whichever is quicker) from campus to home? (Departing campus at 1700 hours) #12;car_app1.doc 4. Staff

Haase, Markus

362

Permitting plan for the immobilized low-activity waste project  

SciTech Connect (OSTI)

This document addresses the environmental permitting requirements for the transportation and interim storage of the Immobilized Low-Activity Waste (ILAW) produced during Phase 1 of the Hanford Site privatization effort. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage and disposal of Tank Waste Remediation Systems (TWRS) immobilized low-activity tank waste (ILAW) and (2) interim storage of TWRS immobilized HLW (IHLW) and other canistered high-level waste forms. Low-activity waste (LAW), low-level waste (LLW), and high-level waste (HLW) are defined by the TWRS, Hanford Site, Richland, Washington, Final Environmental Impact Statement (EIS) DOE/EIS-0189, August 1996 (TWRS, Final EIS). By definition, HLW requires permanent isolation in a deep geologic repository. Also by definition, LAW is ``the waste that remains after separating from high-level waste as much of the radioactivity as is practicable that when solidified may be disposed of as LLW in a near-surface facility according to the NRC regulations.`` It is planned to store/dispose of (ILAW) inside four empty vaults of the five that were originally constructed for the Group Program. Additional disposal facilities will be constructed to accommodate immobilized LLW packages produced after the Grout Vaults are filled. The specifications for performance of the low-activity vitrified waste form have been established with strong consideration of risk to the public. The specifications for glass waste form performance are being closely coordinated with analysis of risk. RL has pursued discussions with the NRC for a determination of the classification of the Hanford Site`s low-activity tank waste fraction. There is no known RL action to change law with respect to onsite disposal of waste.

Deffenbaugh, M.L.

1997-09-04T23:59:59.000Z

363

New Passwords in the Visa and Work Permit Game: A Review of the New Visa and Work Permit Regulatory Framework in Taiwan  

E-Print Network [OSTI]

art. 8(3). VISAS AND WORK PERMITS IN TAIWAN F. PENALTIES ANDVisas and Work Permits 1. OverseasPASSWORDS IN THE VISA AND WORK PERMIT GAME: A REVIEW OF THE

Winkler, Robin; Lee, Robert; Ruff, Andrew

1993-01-01T23:59:59.000Z

364

Tradable Permits with Incomplete Monitoring: Evidence from Santiago’s Particulate Permits Program  

E-Print Network [OSTI]

1980s. The TSP trading program, established in March of 1992, was designed to curb TSP emissions from the largest stationary sources in Santiago (industrial boilers, industrial ovens, and large residential and commercial heaters) whose emissions... to trade permits only on an annual or permanent basis.22 4.2 The data The data for the study were obtained from PROCEFF’s databases for the years 1993 through 1999.23 Each database includes information on the number of sources and their dates of regis...

Montero, Juan-Pablo

2006-03-14T23:59:59.000Z

365

NOTICE OF PROPOSED REGULATION AMENDMENT Date: April 15, 2009  

E-Print Network [OSTI]

.: Florida Solar Energy Center Operations UCF-8.001 SUMMARY OF REGULATION AMENDMENT: The regulation Director, Florida Solar Energy Center COMMENTS CONCERNING THE PROPOSED REGULATION AMENDMENT SHOULD TEXT OF THE PROPOSED REGULATION AMENDMENT: UCF6C7-8.001 Florida Solar Energy Center Operations. (1

Wu, Shin-Tson

366

Ground Water Management Regulations (Louisiana)  

Broader source: Energy.gov [DOE]

The rules and regulations apply to the management of the state's ground water resources. In addition, the Commissioner of Conservation has recommended that oil and gas operators with an interest...

367

US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 1  

SciTech Connect (OSTI)

This report contains the environmental monitoring and assessment results for the Nevada Test Site for 1992. Monitoring and surveillance on and around the NTS by DOE contractors and Site user organizations during 1992 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.15 percent of the guideline for air exposure. All 1992 nuclear events took place during the first three quarters of the calendar year prior to the Congressional testing moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 0.012 mrem. Any person receiving this dose was also exposed to 78 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

1993-09-01T23:59:59.000Z

368

Water Management Plans for Surface Coal Mining Operations (North Dakota)  

Broader source: Energy.gov [DOE]

A water management plan is required for all surface coal mining operations. This plan must be submitted to the State Engineer of the State Water Commission at the same time a surface mining permit...

369

Starting and Operating a Woman-Owned Mechanical Engineering Consulting Firm in Kansas: Business and Operations Plan  

E-Print Network [OSTI]

in these states. An engineering business does not need a federal license to operate. Local County and City Permits There are requirements and restrictions regarding signage, parking, and the type of business allowed in a particular area. Special zoning...

McEwing, Ronald

2005-12-16T23:59:59.000Z

370

RRC - Supplemental Application Information for Permit to Maintain...  

Open Energy Info (EERE)

Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit Jump to: navigation, search OpenEI Reference LibraryAdd to library...

371

U-144:Juniper Secure Access Input Validation Flaw Permits Cross...  

Broader source: Energy.gov (indexed) [DOE]

The vendor has issued a fix (7.0R9, 7.1R). Addthis Related Articles V-193: Barracuda SSL VPN Input Validation Hole Permits Cross-Site Scripting Attacks T-701: Citrix Access...

372

Environmental Permitting of a Low-BTU Coal Gasification Facility  

E-Print Network [OSTI]

that merits serious consideration since only relatively small modifications to the existing oil or gas burner system may be required, and boiler derating can be minimized. The environmental permitting and planning process for a low-Btu coal gasification...

Murawczyk, C.; Stewart, J. T.

1983-01-01T23:59:59.000Z

373

Microsoft Word - Final Class 2 Permit Modification Request TRUPACT...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PMR Permit Modification Request SLB2 standard large box 2 SWB standard waste box TDOP ten-drum overpack TRU transuranic WHB Waste Handling Building WIPP Waste Isolation Pilot...

374

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Energy Savers [EERE]

Register Notice, Volume 79, No. 165, August 26, 2014 Application for Presidential Permit OE Docket No. PP-400 TDI-NE New England Clean Power Link Project: Notice of Intent to...

375

Application for presidential permit OE Docket No. PP-304 Generadora...  

Broader source: Energy.gov (indexed) [DOE]

del Desierto SAde C.V. Western Area Power Administration Application for presidential permit OE Docket No. PP-304 Generadora Del Desierto SA DE CV EIS-0395: Record of Decision and...

376

Idaho Application for Permit to Convert a Geothermal Injection...  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Application for Permit to Convert a Geothermal Injection Well - Form 4003-3 Form Type ApplicationNotice Form...

377

City of Philadelphia- Streamlined Solar Permitting and Fee Reduction  

Broader source: Energy.gov [DOE]

Photovoltaic systems of 10 kW or less installed on 1- or 2-family residential units are eligible for streamlined permitting and a fee reduction. PV projects can use a [http://www.phila.gov/green...

378

Application for presidential permit OE Docket No. PP-234 Baja...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications PP-234 Baja California Power Inc Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC PP-234-1 Baja California Power...

379

NMDOT Application for Permit to Construct an Access or Median...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Construct an Access or Median Opening on Public Right of WayLegal Published NA...

380

Application for presidential permit OE Docket No. PP-334 Energia...  

Broader source: Energy.gov (indexed) [DOE]

Juarex U.S Transmission LLC More Documents & Publications Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC: Notice of Intent To...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Application for Presidential Permit OE Docket No. PP-396 Emera...  

Broader source: Energy.gov (indexed) [DOE]

PP-396 Emera Maine FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81 - April...

382

AZPDES General Permit for Stormwater Discharges Associated with...  

Open Energy Info (EERE)

Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

383

On-Site Wastewater Treatment Systems: Selecting and Permitting  

E-Print Network [OSTI]

This publication explains factors to consider when choosing an on-site wastewater treatment system and lists the nine steps required to obtain a permit for one. It includes addresses and phone numbers of Texas Natural Resource Conservation...

Lesikar, Bruce J.

2005-04-30T23:59:59.000Z

384

Hawaii Application for Surface Water Use Permit for Proposed...  

Open Energy Info (EERE)

Use Permit for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Hawaii...

385

Subsistence Halibut Special Permits Application Page 1 of 8  

E-Print Network [OSTI]

___________________________________ BLOCK B -- SUBSISTENCE HALIBUT COMMUNITY HARVEST (CHP) PERMIT NOTE: Attach any previously issued CHP harvest logs 1. Name of Alaska Native Tribe or Community 2. Name of CHP Coordinator (First, Middle, Last

386

Emissions Trading with Profit-Neutral Permit Allocations  

E-Print Network [OSTI]

This paper examines the impact of an emissions trading scheme (ETS) on equilibrium emissions, output, price, market concentration, and profits in a generalized Cournot model. We develop formulae for the number of emissions permits that have...

Hepburn, Cameron J.; Quah, John K.-H.; Ritz, Robert A.

2012-08-17T23:59:59.000Z

387

Expedited Permitting Process for Solar Photovoltaic Systems (Vermont)  

Broader source: Energy.gov [DOE]

Vermont has established an expedited permitting process for solar photovoltaic systems that are 10 kilowatts-AC (kW) or less. In order to interconnect and net meter, electric customers in Vermont...

388

Wetlands Standard Dredge and Fill Permit (New Hampshire)  

Broader source: Energy.gov [DOE]

The purpose of the permits is to protect and preserve submerged lands under tidal and freshwaters and wetlands, both salt and fresh water, from unregulated alteration that would adversely affect...

389

City of Riverhead- Energy Conservation Device Permitting Fees  

Broader source: Energy.gov [DOE]

In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on...

390

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

391

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

392

File:06 - ConstructionPermitsOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfaConstructionPermitsOverview.pdf Jump to: navigation,

393

EIS-0414: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California  

Broader source: Energy.gov [DOE]

This EIS evaluates the potential environmental impacts from DOE’s proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS.

394

The Design of an Emissions Permit Market for RECLAIM: A Holistic Approach  

E-Print Network [OSTI]

note 7, at 31. EMISSIONS PERMIT MARKET DESIGN uities maya transferable discharge permit * M.S.E.H.S. ( EnvironmentalTransferable Dis- charge Permits for Control of BOD: An

Goldenberg, Evan

1993-01-01T23:59:59.000Z

395

University Food Permit For Serving Food or Refreshments on University Property  

E-Print Network [OSTI]

University Food Permit For Serving Food or Refreshments on University Property Not Required__________________________________________ Date ___________________ When applicable, this permit must be reviewed by the Environmental Hygiene only) #12;Caterer/Restaurant/ Market ADDITIONAL FOOD SOURCES: University Food Permit (Page 2) Foods

Amin, S. Massoud

396

Will Federal Environmental Regulation be Permitted to Infringe on State Vested Water Rights?  

E-Print Network [OSTI]

Irrigation Dist. v. State Water Resources Control Bd. , 27516. See United States v. State Water Resources Control Bd. ,by the § 8 deference to state water law. 372 U.S. 627, 630-

Dorrity, Kristen

1992-01-01T23:59:59.000Z

397

O.A.R. 340-045 - Regulations Pertaining to NPDES and WPCF Permits | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company)ReferencesNuiqsut, Alaska:Nutley, NewEnergy Information 45 -

398

ORS 517.705 Exploration Permit Regulations for Mining and Mining Claims |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company)ReferencesNuiqsut, Alaska:Nutley,EnergyOHmOpen Energy

399

5 CCR 1002-61 Colorado Discharge Permit System Regulations | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskey Flatshydro Homepowering9century GreenEInformation

400

5 CCR 1002-61 Colorado Discharge Permit System Regulations | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights, Substantive Jump to:Species |2008 |44 Basic

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

402

Application for a Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

canada Border. Amendment to Presidential Permit Application Letter. LetterPermitAmendmentof28Feb12.pdf More Documents & Publications EIS-0447: Amended Notice of Intent to...

403

Application for Presidential Permit OE Docket No. PP-399 MATL LLP  

Broader source: Energy.gov [DOE]

Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission facilities.

404

Application for Presidential Permit OE Doc. No. PP-399 MATL LLP...  

Broader source: Energy.gov (indexed) [DOE]

Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission facilities. Federal Register...

405

Major Source Operating Permit Application for the U.S. Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the NNSA Weapons Program DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL 9TH FLOOR, L&C ANNEX 401 CHURCH STREET NASHVILLE, TN 37243-1531 APC...

406

E-Print Network 3.0 - air operating permit Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ratio of the heated ambient air... the amount of stack particulate emis SlOns. Air pollution ... Source: Columbia University - Waste-to-Energy Research and Technology Council...

407

New Mexico Air Operating Permit List of Trivial Activities | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company) Jump to: navigation, searchOhio:MO) Jump to:Information

408

Sandia National Laboratories land use permit for operations at Oliktok Alaska Long Range Radar Station.  

SciTech Connect (OSTI)

The property subject to this Environmental Baseline Survey (EBS) is located at the Oliktok Long Range Radar Station (LRRS). The Oliktok LRRS is located at 70%C2%B0 30' W latitude, 149%C2%B0 53' W longitude. It is situated at Oliktok Point on the shore of the Beaufort Sea, east of the Colville River. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

Catechis, Christopher Spyros

2013-02-01T23:59:59.000Z

409

File:07NVAPermitToConstructAndPermitToOperate (3).pdf | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdf Jump to: navigation, search File File history FileInformation

410

File:WASH-Air Operating Permit Application and Instructions.pdf | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf Jump to:Siting.pdf Jump to:

411

Title 43 CFR 3261 Drilling Operations: Getting a Permit | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump JumpAl.,InformationInformationInformation

412

Alternative Regulation (Vermont)  

Broader source: Energy.gov [DOE]

Utility regulators, including the Public Service Board, have applied a new type of regulation, often called "alternative regulation" or "incentive regulation." There are many variants of this type...

413

Government Regulation  

E-Print Network [OSTI]

Abstract. Interest in the use of so-called voluntary approaches to supplement or replace formal environmental regulation is on the rise, both in Europe and in the United States. These approaches fall into two general ...

Ashford, Nicholas

2005-01-01T23:59:59.000Z

414

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

operating attributes:  Load following.   Spinning and non?dispatchable, then load following, regulation, ramping regulation, ramping, load following, voltage support and 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

415

The WIPP Hazardous Waste Facility Permit Improvements--2007 Update  

SciTech Connect (OSTI)

The most significant changes to the Waste Isolation Pilot Plant Hazardous Waste Facility Permit to date were completed during the past year with the implementation of significant revisions to the Waste Analysis Plan and the authorization to dispose of remote-handled transuranic waste. The modified Permit removes the requirement for reporting headspace gas sampling and analysis results for every container of transuranic mixed waste and provides for the use of radiography and visual examination to confirm a statistically representative subpopulation of the waste stream in each waste shipment as well as other changes that streamline the analytical data management process. Implementation began on November 17, 2006. (authors)

Kehrman, R.; Most, W. [Washington Regulatory and Environmental Services, Carlsbad, NM (United States)

2007-07-01T23:59:59.000Z

416

File:06AKCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfaConstructionPermitsOverview.pdf JumpInformationsource

417

Development of Science-Based Permitting Guidance for Geological Sequestration of CO2 in Deep Saline Aquifers Based on Modeling and Risk Assessment  

SciTech Connect (OSTI)

Underground carbon storage may become one of the solutions to address global warming. However, to have an impact, carbon storage must be done at a much larger scale than current CO{sub 2} injection operations for enhanced oil recovery. It must also include injection into saline aquifers. An important characteristic of CO{sub 2} is its strong buoyancy--storage must be guaranteed to be sufficiently permanent to satisfy the very reason that CO{sub 2} is injected. This long-term aspect (hundreds to thousands of years) is not currently captured in legislation, even if the U.S. has a relatively well-developed regulatory framework to handle carbon storage, especially in the operational short term. This report proposes a hierarchical approach to permitting in which the State/Federal Government is responsible for developing regional assessments, ranking potential sites (''General Permit'') and lessening the applicant's burden if the general area of the chosen site has been ranked more favorably. The general permit would involve determining in the regional sense structural (closed structures), stratigraphic (heterogeneity), and petrophysical (flow parameters such as residual saturation) controls on the long-term fate of geologically sequestered CO{sub 2}. The state-sponsored regional studies and the subsequent local study performed by the applicant will address the long-term risk of the particular site. It is felt that a performance-based approach rather than a prescriptive approach is the most appropriate framework in which to address public concerns. However, operational issues for each well (equivalent to the current underground injection control-UIC-program) could follow regulations currently in place. Area ranking will include an understanding of trapping modes. Capillary (due to residual saturation) and structural (due to local geological configuration) trappings are two of the four mechanisms (the other two are solubility and mineral trappings), which are the most relevant to the time scale of interest. The most likely pathways for leakage, if any, are wells and faults. We favor a defense-in-depth approach, in which storage permanence does not rely upon a primary seal only but assumes that any leak can be contained by geologic processes before impacting mineral resources, fresh ground water, or ground surface. We examined the Texas Gulf Coast as an example of an attractive target for carbon storage. Stacked sand-shale layers provide large potential storage volumes and defense-in-depth leakage protection. In the Texas Gulf Coast, the best way to achieve this goal is to establish the primary injection level below the total depth of most wells (>2,400 m-8,000 ft). In addition, most faults, particularly growth faults, present at the primary injection level do not reach the surface. A potential methodology, which includes an integrated approach comprising the whole chain of potential events from leakage from the primary site to atmospheric impacts, is also presented. It could be followed by the State/Federal Government, as well as by the operators.

Jean-Philippe Nicot; Renaud Bouroullec; Hugo Castellanos; Susan Hovorka; Srivatsan Lakshminarasimhan; Jeffrey Paine

2006-06-30T23:59:59.000Z

418

NOTICE OF PROPOSED REGULATION AMENDMENT Date: August 18, 2005  

E-Print Network [OSTI]

.: Florida Solar Energy Center Operations 6C7-8.001 SUMMARY OF REGULATION AMENDMENT: This regulation is revised to update the location of the Florida Solar Energy Center. This regulation is amended also of Florida Solar Energy Center COMMENTS CONCERNING THE PROPOSED REGULATION AMENDMENT SHOULD BE SUBMITTED

Wu, Shin-Tson

419

NOTICE OF PROPOSED REGULATION AMENDMENT Date: November 8, 2011  

E-Print Network [OSTI]

.: Florida Solar Energy Center Operations UCF-8.006 SUMMARY OF REGULATION: This regulation is an updated-mail: regulations@mail.ucf.edu FULL TEXT OF THE PROPOSED REGULATION AMENDMENT: UCF-8.006 Florida Solar Energy Center AMENDMENT: Dr. James Fenton, Director, Florida Solar Energy Center COMMENTS CONCERNING THE PROPOSED

Richardson, Martin C.

420

Area- and site-specific geothermal leasing/permitting profiles; updated geothermal leasing/permitting performance assessment  

SciTech Connect (OSTI)

Sufficient discussion of the elements of the leasing and permitting programs is included to place the information developed in proper context. A table and process flow diagram developed previously which outline the steps in the non-competitive leasing process, is reprinted. Computer printout profiles are presented on 195 identifiable areas in the following states: Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. Sufficient information on the boundaries of these areas is contained in the report to permit identification of their general location on any map of the appropriate state which shows township and range locations.

Beeland, G.V.; Schumann, E.; Wieland, M.

1982-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector  

E-Print Network [OSTI]

. carbon permit values are large and almost offset the welfare losses; 5. carbon permit price implicationsThe Impacts of Carbon Permit Prices on the U.S. Agricultural Sector Prepared by: Bruce Mc Washington, D.C. April 1999 #12;ICF 1 The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector

McCarl, Bruce A.

422

Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY  

E-Print Network [OSTI]

Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY (657 CHAIR/ DIRECTOR NAME CSUF EMAIL ADDRESS DAY PHONE # DEPARTMENT Individual Special Permit Department "Shared Use" Special Permit Please provide a written explanation of the purpose for the Special Use Permit

de Lijser, Peter

423

January 18, 2001 Welfare Gains under Tradable CO2 Permits*  

E-Print Network [OSTI]

emissions, together with changes in inputs such as capital and labor. We can use this data to estimate and policymakers have proposed establishing tradable carbon permits to decrease the cost of reducing global carbon it relatively straightforward to estimate supply and demand curves that can be used to study the effects

Karp, Larry S.

424

Regulatory Guidance Letter 88-06 SUBJECT: Nationwide Permit Guidance  

E-Print Network [OSTI]

-casting of material that occurs with normal construction practice provided the best management practices at 330.S. The discharge is further limited by 33 CFR 330.6, best management practices, which require the minimization the outfall has an NPDES permit. Section 405 of the Water Quality Act of 1987 exempts storm water outfalls

US Army Corps of Engineers

425

Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)  

SciTech Connect (OSTI)

The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

Young, K. R.; Levine, A.

2014-09-01T23:59:59.000Z

426

The Initial Allocation of Carbon Permits: Choices and Implications  

E-Print Network [OSTI]

tax doesn't mean large government. #12;Percent of Consumption Expenditures by Region and Income Range&D spillovers, not to correct the emission externality. #12;Handing out permits is like a government-enforced cartel to restrict quantity, in order to raise price. Quantity of coal-fired electricity Price Marginal

427

Hazardous Waste Facility Permit Public Comments to Community...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 SECTION COMMENT POST? 2.0 & 4.0 1. Fix broken links on pages 3 and 4 for the HWA permit. Yes 2.0 2. Revise a sentence on page 4 to: "Limits on LANL waste facilities may be...

428

Energy storage for frequency regulation on the electric grid  

E-Print Network [OSTI]

Ancillary services such as frequency regulation are required for reliable operation of the electric grid. Currently, the same traditional thermal generators that supply bulk power also perform nearly all frequency regulation. ...

Leitermann, Olivia

2012-01-01T23:59:59.000Z

429

How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year  

E-Print Network [OSTI]

How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year 15,000 yen the permit on the fender of your bike where it can be seen easily. Application Procedures Bicycle Permit Motorcycle Permit Bicycle Permit Motorcycle Permit Dai-ni Koubaibu Store: Weekdays 10 00 19 00 Nougakubu

Miyashita, Yasushi

430

Dissertation Permit Form Revised 09/09 CSE Ph.D. ADVISOR SELECTION AND PRE-DISSERTATION (8999) PERMIT FORM  

E-Print Network [OSTI]

Dissertation Permit Form­ Revised 09/09 CSE Ph.D. ADVISOR SELECTION AND PRE-DISSERTATION (8999) hours, you must have a permanent advisor and have not passed the qualifier. You must complete this form in consultation with your dissertation advisor. Bring the signed form to the Academic Advisor in Computational

Gray, Alexander

431

Design of Optimal Regulators  

E-Print Network [OSTI]

Current research suggests the use of a liner quadratic performance index for optimal control of regulators in various applications. Some examples include correcting the trajectory of rocket and air vehicles, vibration suppression of flexible structures, and airplane stability. In all these cases, the focus is in suppressing/decreasing system deviations rapidly. However, if one compares the Linear Quadratic Regulator (LQR) solution with optimal solutions (minimum time), it is seen that the LQR solution is less than optimal in some cases indeed (3-6) times that obtained using a minimum time solution. Moreover, the LQR solution is sometimes unacceptable in practice due to the fact that values of control extend beyond admissible limits and thus the designer must choose coefficients in the linear quadratic form, which are unknown. The authors suggest methods which allow finding a quasi-optimal LQR solution with bounded control which is closed to the minimum time solution. They also remand the process of the minimum time decision. Keywords: Optimal regulator, minimum time controller, Linear Quadratic Regulator (LQR). -- This paper is declared a work of the U.S. Government and not subject to copyright protection in the USA. The manuscript is accepted as paper AIAA-2003-6638 by 2nd AIAA Unmanned Unlimited Systems, Technologies, and Operations-Aerospace, Land, and See Conference and Workshop - Exhibit, San Diego, California, USA, 15-18 Sep. 2003.

Alexander Bolonkin; Robert Sierakowski

2007-01-19T23:59:59.000Z

432

Regulation 28: Library REGULATION 28: LIBRARY  

E-Print Network [OSTI]

Regulation 28: Library 180 REGULATION 28: LIBRARY The purpose of this Regulation is to safeguard the common interests of all Library users. All persons are admitted on the understanding that they have read and agreed to observe the Library Regulations. Breach of this Regulation could result in membership being

Sussex, University of

433

Sewage Treatment Plant (STP) Design/SPDES Permit Modifications Update  

E-Print Network [OSTI]

Permit that was issued on June 9, 2009, which included more stringent water quality based effluent limits (NA) NA 2.3 pH (SU) 5.8-9.0 * 6.5-8.5 5.8-8.5 Total Suspended Solids (mg/l) 20 NA NA 20 Total.1 Temperature (°F) 90 NA NA --- Total Nitrogen, as N (mg/l) 10 NA 10 10 Total Nitrogen (lbs/day) 20 NA NA

Johnson, Peter D.

434

New Mexico Guidelines for Public Notification for Air Quality Permit  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company) Jump to: navigation, searchOhio:MO) JumpPermits

435

Hawaii Guide for Filing Community Noise Permit Applications | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor | Open EnergySectionEnergyInformation Permit

436

Hawaii State Habitat Conservation Plan Permit Brief | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor | OpenOpenInformation Plan Permit Brief Jump

437

Hawaii Underground Injection Control Permit Packet | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor | OpenOpenInformation Plan Permit

438

Hazardous Waste Facility Permit Fact Sheet | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor |InformationNevada:1227118°,HaysvillePermit

439

Hazardous Waste Part A Permit Application | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridorPart A Permit Application Jump to: navigation,

440

Montana Water Quality Permit Application, Nondegradation Authorization, and  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate Zone Subtype A.InformationGuide WebpagePermit Fees |

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

50 CFR 13 - General Permit Procedures | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskey Flatshydro Homepowering9centuryGeneral Permit

442

RRC - Online Drilling Permit System Login webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColoradosource History View New PagesElectronDrilling Permit

443

File:03UTFEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jump

444

File:04AKBGeophysicalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jumpsource History View New Pages Recent

445

File:04AKCGeothermalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jumpsource History View New Pages

446

File:04HIAExplorationPermit (1).pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jumpsource History

447

File:05DrillingPermittingOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfa - DrillingPreApplicationProcess.pdfsource History

448

OPERATIONS (OPS)  

Broader source: Energy.gov (indexed) [DOE]

OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13)...

449

Design operators  

E-Print Network [OSTI]

Design operators is a thesis that investigates the nature and characteristics of the design process by examining the interaction of computation with architectural design. The effects of the introduction of these media in ...

Dritsas, Stylianos, 1978-

2004-01-01T23:59:59.000Z

450

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

451

State Waste Discharge Permit Application: Electric resistance tomography testing  

SciTech Connect (OSTI)

This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

Not Available

1994-04-01T23:59:59.000Z

452

Hazardous Waste Management Standards and Regulations (Kansas)  

Broader source: Energy.gov [DOE]

This act states the standards and regulations for the management of hazardous waste. No person shall construct, modify or operate a hazardous waste facility or otherwise dispose of hazardous waste...

453

Modeling Operational Constraints imposed by Renewable Generation  

E-Print Network [OSTI]

4 #12;Operational effects into NETPLAN G LX L T R 5 #12;Effect of Wind on Load Following 10 min, that include: Regulation, Intra-hour and inter-hour load following, Contingency reserves, Generation cycling

Daniels, Thomas E.

454

US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 1  

SciTech Connect (OSTI)

Monitoring and surveillance on and around the Nevada Test Site (NTS) by DOE contractors and NTS user organizations during 1993 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE guidelines, i.e., the dose the maximally exposed offsite individual could have received was less than 0.04 percent of the 10 mrem per year guide for air exposure. No nuclear tests were conducted due to the moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated effective dose equivalent to the maximally exposed individual offsite would have been 0.004 mrem. Any person receiving this dose would also have received 97 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Support facilities at off-NTS locations compiled with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Glines, W.M.; Townsend, Y.E. [eds.

1994-09-01T23:59:59.000Z

455

Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices  

SciTech Connect (OSTI)

Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) thelack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

Not Available

1980-11-01T23:59:59.000Z

456

South Carolina Surface Water Withdrawal, Permitting Use, and Reporting Act (South Carolina)  

Broader source: Energy.gov [DOE]

Surface water withdrawals exceeding three million gallons during any one month require a permit; a permit will only be granted if the Department of Health and Environmental Control determines that...

457

U-212: RSA Authentication Manager Flaws Permit Cross-Site and...  

Energy Savers [EERE]

Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks V-026: RSA Data Protection Manager Bugs Permit Cross-Site...

458

U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection...  

Energy Savers [EERE]

129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and...

459

Environmental permits and approvals plan for high-level waste interim storage, Project W-464  

SciTech Connect (OSTI)

This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

Deffenbaugh, M.L.

1998-05-28T23:59:59.000Z

460

V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks August 28, 2013 -...

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

U-206: WordPress Flaws Permit Cross-Site Scripting, Cross-Site...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

6: WordPress Flaws Permit Cross-Site Scripting, Cross-Site Request Forgery, and Information Disclosure Attacks U-206: WordPress Flaws Permit Cross-Site Scripting, Cross-Site...

462

V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...  

Broader source: Energy.gov (indexed) [DOE]

8: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

463

V-124: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...  

Broader source: Energy.gov (indexed) [DOE]

4: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-124: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks April 2, 2013 - 1:13am Addthis...

464

New Mexico Archaeological Permits Webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company) Jump to: navigation, searchOhio:MO) JumpPermits Webpage Jump to:

465

Construction and Minor Permit Applications | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) | OpenMinor Permit Applications Jump to: navigation,

466

EPA Class V Permitting Authorities Website | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified as ASHRAEDuvalJustice webpageClass V Permitting

467

Application for Nonpurposeful Eagle Take Permit | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy Information the Army Permit: Engineering Form 4345 Jump

468

Application for Permit to Construct Access Driveway Facilities on Highway  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy Information the Army Permit: Engineering Form 4345 JumpROW |

469

Arizona State Land Department Applications and Permits Website | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy InformationArcata,KoblitzEnergy Information Permits

470

Solar and Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g GrantAtlas (PACA Region - France) JumpBeginnerThin PowerPermitting

471

Solar/Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to:Information Silver PeakSystems JumpPermitting Standards <

472

Property:AirQualityPermitProcess | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyo County, California | Open Energy InformationAirQualityPermitProcess Jump to:

473

Property:ExplorationPermitAgency-Drilling | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration Jump to: navigation,ExplorationPermitAgency-Drilling Property Type Page

474

Property:ExplorationPermitAgency-PreDrilling | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration Jump to: navigation,ExplorationPermitAgency-Drilling Property Type

475

Alaska Air Permit Program Webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasil JumpAerowattOpen2008District No 3formPermits |Webpage Jump

476

Alaska DEC Water Permit Search | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasil JumpAerowattOpen2008District No 3formPermits |Webpage

477

File:06IDBConstructionStormwaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to: navigation, searchIDBConstructionStormwaterPermit.pdf

478

File:06MTCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to: navigation,EnergyMTCDrinkingWaterPermit.pdf Jump to:

479

File:06NVATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to: navigation,EnergyMTCDrinkingWaterPermit.pdfOpensource

480

File:06NVCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf Jump to: navigation, search

Note: This page contains sample records for the topic "operating permit regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

File:06ORATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf Jump to: navigation,

482

File:06ORCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf Jump

483

File:Permit2012.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf Jump to: navigation, search File FileOriginalPermit2012.pdf

484

Form GWS-45 - Well Permit Application | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vsFlintFlux PowerFootprintOnPermit Application

485

File:03IDCEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37.California:FDCRightOfWayROWAccess (2).pdfIDCEncroachmentPermit.pdf Jump to:

486

File:03MTEEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jump to: navigation, search File File history File usage

487

APPLICATION FOR CAR SHARING PARKING PERMIT 2014/15 (EXETER CAMPUSES)  

E-Print Network [OSTI]

APPLICATION FOR CAR SHARING PARKING PERMIT 2014/15 (EXETER CAMPUSES) Please complete this form · To display the permit on the vehicle at all times when it is being used for car sharing purposes whilst and take it to Car Parking Office, Streatham Farm Lead name Title Permit No: Initial: Surname: BUDI Team

Bearhop, Stuart

488

The Impact of Imperfect Permit Market on Congested Electricity Market Equilibrium  

E-Print Network [OSTI]

The Impact of Imperfect Permit Market on Congested Electricity Market Equilibrium Tanachai market in conjunction with a permit market to study such interactions. The concept of conjectural variations is proposed to account for imperfect competition in permit market. The model is then applied

Oren, Shmuel S.

489

Conducting Private R&D at PNNL Tapping valuable government resources with a unique Use Permit  

E-Print Network [OSTI]

Conducting Private R&D at PNNL Tapping valuable government resources with a unique Use Permit What. Unique to PNNL is a powerful technology development and transfer mechanism known as the Use Permit. The Use Permit allows Battelle staff working at PNNL to use federal government facilities and equipment

490

Introduction The Sustainable Supply Chain Taxes Permits Integration Future Research Sustainable Supply Chains  

E-Print Network [OSTI]

Introduction The Sustainable Supply Chain Taxes Permits Integration Future Research Sustainable;Introduction The Sustainable Supply Chain Taxes Permits Integration Future Research 1 Introduction 2 The Sustainable Supply Chain 3 Taxes 4 Permits 5 Integration 6 Future Research Dissertation Defense by Trisha D

Nagurney, Anna

491

EMPLOYEES U-PASS & Parking Permits Shaded area to be completed by Cashier Office  

E-Print Network [OSTI]

Motorcycle Parking Permit * (Not Valid for Automobiles, valid 24/7) Pre-tax Payroll Deduction of $10.17 per paycheck *Motorcycle permits must be displayed and locked to the motorcycle in the holder provided. Copies by hanging forward on the rearview mirror or upright on driver side dashboard. Motorcycle permits must

Dunham, Maitreya

492

Alaska Oil and Gas Exploration, Development, and Permitting Project  

SciTech Connect (OSTI)

This is the final technical report for Project 15446, covering the grant period of October 2002 through March 2006. This project connects three parts of the oil exploration, development, and permitting process to form the foundation for an advanced information technology infrastructure to better support resource development and resource conservation. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells. The broad goal of this grant is to increase domestic production from Alaska's known producing fields through the implementation of preferred upstream management practices. (PUMP). Internet publication of extensive and detailed geotechnical data is the first task, improving the permitting process is the second task, and building an advanced geographical information system to offer continuing support and public access of the first two goals is the third task. Excellent progress has been made on all three tasks; the technical objectives as defined by the approved grant sub-tasks have been met. The end date for the grant was March 31, 2006.

Richard McMahon; Robert Crandall

2006-03-31T23:59:59.000Z

493

Operation Poorman  

SciTech Connect (OSTI)

The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

Pruvost, N.; Tsitouras, J.

1981-03-18T23:59:59.000Z

494

Operations Videos  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations

495

RCRA Permit for a Hazardous Waste Management Facility, Permit Number NEV HW0101, Annual Summary/Waste Minimization Report  

SciTech Connect (OSTI)

This report summarizes the EPA identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

Arnold, Patrick [NSTec] [NSTec

2014-02-14T23:59:59.000Z

496

RULES AND REGULATIONS ENVIRONMENTAL QUALITY BOARD  

E-Print Network [OSTI]

on best management practices to protect and restore that important resource, and to meet PennsylvaniaRULES AND REGULATIONS ENVIRONMENTAL QUALITY BOARD [25 PA. CODE CHS. 91 AND 92] Concentrated Animal Feeding Operations and Other Agricultural Operations [35 Pa.B. 5796] The Environmental Quality Board

Guiltinan, Mark

497

WATER DISTRIBUTION SYSTEM OPERATION: APPLICATION OF  

E-Print Network [OSTI]

CHAPTER 5 WATER DISTRIBUTION SYSTEM OPERATION: APPLICATION OF SIMULATED ANNEALING Fred E. Goldman Arizona State University, Tempe, Arizona 5.1 INTRODUCTION The operation of water distribution systems affects the water quality in these systems. EPA regulations require that water quality be maintained

Mays, Larry W.

498

NOTICE OF PROPOSED REGULATION AMENDMENT Date: March 22, 2007  

E-Print Network [OSTI]

.: Florida Solar Energy Center Operations 6C7-8.001 SUMMARY OF REGULATION AMENDMENT: The amendments INITIATED PROPOSED REGULATION AMENDMENT: Philip Fairey, Deputy Director of Florida Solar Energy CenterC7-8.001 Florida Solar Energy Center Operations. (1) The Florida Solar Energy Center, (herein called

Wu, Shin-Tson

499

Mixed waste landfill cell construction at energy solutions LLC: a regulator's perspective  

SciTech Connect (OSTI)

A small percentage of the property that EnergySolutions' (formerly Envirocare) operates at Clive, Utah is permitted by the State of Utah as a treatment, storage and disposal facility for mixed waste. Mixed Waste is defined as a hazardous waste (Title 40 Code of Federal Regulations Part 261.3) that also has a radioactive component. Typically, the waste EnergySolutions receives at its mixed waste facility is contaminated with heavy metals and organic compounds while also contaminated with radioactivity. For EnergySolutions, the largest generator of mixed waste is the United States Department of Energy. However, EnergySolutions also accepts a wide variety of mixed waste from other generators. For many wastes, EnergySolutions goes through the process of characterization and acceptance (if appropriate) of the waste, treating the waste (if necessary), confirmation that the waste meets Land Disposal Restriction, and disposal of the waste in its mixed waste landfill cell (MWLC). EnergySolutions originally received its State-issued Part B (RCRA) permit in 1990. The Permit allows a mixed waste landfill cell footprint that covers roughly 10 hectares and includes 20 individual 'sumps'. EnergySolutions chose to build small segments of the landfill cell as waste receipts dictated. Nearly 16 years later, EnergySolutions has just completed its Phase V construction project. 18 of the 20 sumps in the original design have been constructed. The last two sumps are anticipated to be its Phase VI construction project. Further expansion of its mixed waste disposal landfill capacity beyond the current design would require a permit modification request and approval by the Executive Secretary of the Utah Solid and Hazardous Waste Control Board. Construction of the landfill cell is governed by the Construction Quality Assurance/Quality Control manual of its State-issued Permit. The construction of each sump is made up of (from the bottom up): a foundation; three feet of engineered clay; primary and secondary geo-synthetics (60 mil HDPE, geo-fabric and geo-textile); a two foot soil protective cover; tertiary geo-synthetics (80 mil HDPE, geo-fabric and geo-textile); and a final two foot soil protective cover. The Utah Department of Environmental Quality Division of Solid and Hazardous Waste (UDEQ/DSHW) oversees the construction process and reviews the documentation after the construction is complete. If all aspects of the construction process are met, the Executive Secretary of the Utah Solid and Hazardous Waste Control Board approves the landfill cell for disposal. It is the role of the regulator to ensure to the stakeholders that the landfill cell has been constructed in accordance with the State-issued permit and that the cell is protective of human health and the environment. A final determination may require conflict resolution between the agency and the facility. (authors)

Lukes, G.C.; Willoughby, O.H. [Utah Department of Environmental Quality, Div. of Solid and Hazardous Waste (United States)

2007-07-01T23:59:59.000Z

500

City of Chicago- Green Permit and Green Homes Programs  

Broader source: Energy.gov [DOE]

The City of Chicago encourages building design, construction and renovation in a manner that provides healthier environments, reduces operating costs and conserves energy and resources through...