Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Method and apparatus for sensorless operation of brushless permanent magnet motors  

DOE Patents (OSTI)

A sensorless method and apparatus for providing commutation timing signals for a brushless permanent magnet motor extracts the third harmonic back-emf of a three-phase stator winding and independently cyclically integrates the positive and negative half-cycles thereof and compares the results to a reference level associated with a desired commutation angle. 23 figs.

Sriram, T.V.

1998-04-14T23:59:59.000Z

2

A "permanent" high-temperature superconducting magnet operated in thermal communication with a mass of solid nitrogen  

E-Print Network (OSTI)

This thesis explores a new design for a portable "permanent" superconducting magnet system. The design is an alternative to permanent low-temperature superconducting (LTS) magnet systems where the magnet is cooled by a ...

Haid, Benjamin J. (Benjamin John Jerome), 1974-

2001-01-01T23:59:59.000Z

3

Operational behavior of a double-fed permanent magnet generator for wind turbines  

E-Print Network (OSTI)

Greater efficiency in wind turbine systems is achieved by allowing the rotor to change its rate of rotation as the wind speed changes. The wind turbine system is decoupled from the utility grid and a variable speed operation ...

Reddy, Sivananda Kumjula

2005-01-01T23:59:59.000Z

4

Computer Based Motor Parameter Determination for High Speed Operation of Permanent Magnet Synchronous Machines  

E-Print Network (OSTI)

Synchronous Machines B. Szabados and U. Schaible McMaster University 1280 Main St. W., Hamilton, Ontario PM synchronous machine parameters in the high speed operating range. The theory and real interior PM synchronous machine at up to 8000 rpm. Results are presented which show a significant variation

Szabados, Barna

5

Cryogenic permanent magnet undulators  

Science Journals Connector (OSTI)

In order to obtain high magnetic fields in a short period undulator, superconductive undulators have been actively investigated in recent years. In this paper, however, we propose a new approach, the cryogenic permanent magnet undulator (CPMU) design, using permanent magnets at the cryogenic temperature of liquid nitrogen or higher. This cryogenic scheme can be easily adapted to currently existing in-vacuum undulators and it improves the magnetic field performance by 30%–50%. Unlike superconductive undulators operating around the liquid helium temperature, there is no big technological difficulty such as the thermal budget problem. In addition, existing field correction techniques are applicable to the CPMUs. Since there is no quench in the CPMUs, the operation of the CPMUs has the same reliability as conventional permanent magnet undulators.

Toru Hara; Takashi Tanaka; Hideo Kitamura; Teruhiko Bizen; Xavier Maréchal; Takamitsu Seike; Tsutomu Kohda; Yutaka Matsuura

2004-05-18T23:59:59.000Z

6

Permanent polarization and charge distribution in organic light-emitting diodes (OLEDs): Insights from near-infrared charge-modulation spectroscopy of an operating OLED  

SciTech Connect

Vapor-deposited Alq{sub 3} layers typically possess a strong permanent electrical polarization, whereas NPB layers do not. (Alq{sub 3} is tris(8-quinolinolato)aluminum(III); NPB is 4,4?-bis[N-(1-naphthyl)-N-phenylamino]biphenyl.) The cause is a net orientation of the Alq{sub 3} molecules with their large dipole moments. Here we report on consequences for an organic light-emitting diode (OLED) with an NPB hole-transport layer and Alq{sub 3} electron-transport layer. The discontinuous polarization at the NPB|Alq{sub 3} interface has the same effect as a sheet of immobile negative charge there. It is more than compensated by a large concentration of injected holes (NPB{sup +}) when the OLED is running. We discuss the implications and consequences for the quantum efficiency and the drive voltage of this OLED and others. We also speculate on possible consequences of permanent polarization in organic photovoltaic devices. The concentration of NPB{sup +} was measured by charge-modulation spectroscopy (CMS) in the near infrared, where the NPB{sup +} has a strong absorption band, supplemented by differential-capacitance and current-voltage measurements. Unlike CMS in the visible, this method avoids complications from modulation of the electroluminescence and electroabsorption.

Marchetti, Alfred P.; Haskins, Terri L.; Young, Ralph H.; Rothberg, Lewis J. [Department of Chemistry, University of Rochester, Rochester, New York 14627 (United States)

2014-03-21T23:59:59.000Z

7

Hybrid permanent magnet and variable reluctance generator  

SciTech Connect

This patent describes a hybrid electrical generator. It comprises: a permanent magnet generator having a permanent magnet rotor mounted on a shaft, the permanent magnet generator providing an output voltage over an operating range which falls in response to an increasing electrical load; a variable reluctance generator having a rotor mounted on the shaft with excitation of a stator of the variable reluctance generator being provided from the permanent magnet generator, the variable reluctance generator providing an output voltage which varies in response to an increasing electrical load over an operating range; and a voltage regulator, responsive to combined output voltages of the generators, for controlling the output voltage provided by the variable reluctance generator.

Vaidya, J.; Belanger, D.J.

1990-09-25T23:59:59.000Z

8

Permanent Markers Implementation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

9

Cylindrical Hall Thrusters with Permanent Magnets  

SciTech Connect

The use of permanent magnets instead of electromagnet coils for low power Hall thrusters can offer a significant reduction of both the total electric power consumption and the thruster mass. Two permanent magnet versions of the miniaturized cylindrical Hall thruster (CHT) of different overall dimensions were operated in the power range of 50W-300 W. The discharge and plasma plume measurements revealed that the CHT thrusters with permanent magnets and electromagnet coils operate rather differently. In particular, the angular ion current density distribution from the permanent magnet thrusters has an unusual halo shape, with a majority of high energy ions flowing at large angles with respect to the thruster centerline. Differences in the magnetic field topology outside the thruster channel and in the vicinity of the channel exit are likely responsible for the differences in the plume characteristics measured for the CHTs with electromagnets and permanent magnets. It is shown that the presence of the reversing-direction or cusp-type magnetic field configuration inside the thruster channel without a strong axial magnetic field outside the thruster channel does not lead to the halo plasma plume from the CHT. __________________________________________________

Yevgeny Raitses, Enrique Merino and Nathaniel J. Fisch

2010-10-18T23:59:59.000Z

10

SUPER HIGH-SPEED MINIATURIZED PERMANENT MAGNET SYNCHRONOUS MOTOR  

E-Print Network (OSTI)

SUPER HIGH-SPEED MINIATURIZED PERMANENT MAGNET SYNCHRONOUS MOTOR by LIPING ZHENG B.S. Shanghai with the design of permanent magnet synchronous motors (PMSM) to operate at super-high speed with high efficiency shaft output power at 200,000 rpm and at the cryogenic temperature of 77 K. The test results showed

Wu, Thomas

11

Permanent magnet steam generator  

SciTech Connect

This patent describes a system for magnetic heating of a fluid by motor rotation of a permanent magnet rotor adjacent an assembly of ferro-magnetic condensing plate and of copper heat absorber plate with protrusions through the ferro-magnetic condensing plate into an enclosure with the fluid therein and having fluid inlet and fluid outlet. The assembly has a first shaft and a second shaft coaxially spaced therefrom, a respective the motor connected to the outer end of each shaft, and a respective the permanent magnet rotor connected to the inner end of each shaft, adjacent a the heat absorber plate. The improvement described here comprises: the enclosure including a steel boiler with a first the ferro-magnetic condensing plate closing off a first end thereof and a second the ferro-magnetic condensing plate closing off a second end thereof, a the copper heat absorbing plate affixed on each ferro-magnetic plate; means, free of pockets, for promoting turbulent flow of the fluid with uniformly good heat transfer including the protrusion being a plurality of heat sinks, each heat sink of the plurality of heat sinks comprising an integral elongate member with an alternately large diameter and smaller diameter portions regularly spaced therealong. The elongate members through the first the ferro-magnetic condensing plate are coaxially aligned with the elongate members through the second the ferro-magnetic condensing plate.

Gerard, F.; Gerard, F.J.

1986-09-30T23:59:59.000Z

12

Are Permanent Magnets Really Permanent? | GE Global Research  

NLE Websites -- All DOE Office Websites (Extended Search)

2012.07.13 Chief Scientist Jim Bray describes how permanent magnets in motors and generators may lose force over time. 0 Comments Comment Name Email Submit Comment You Might...

13

Telecommunications Audio Conference 800 # (Permanent)  

E-Print Network (OSTI)

Telecommunications Audio Conference 800 # (Permanent) 1. Fax completed form to 979.847.1111. 2 Signature Date Service Date Desired Telecommunications Office Use Only 800 # Conference Number Toll Number

14

Permanent Closure of the TAN-664 Underground Storage Tank  

SciTech Connect

This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

Bradley K. Griffith

2011-12-01T23:59:59.000Z

15

MagLab - MagLab Dictionary: Permanent Magnet (Transcript)  

NLE Websites -- All DOE Office Websites (Extended Search)

by Scott Hannahs, DC Facilities & Instrumentation director. Permanent magnet Field lines of a permanent magnet go from north to south. Permanent magnets are materials where...

16

Method of making permanent magnets  

DOE Patents (OSTI)

A method for making an isotropic permanent magnet comprises atomizing a melt of a rare earth-transition metal alloy (e.g., an Nd--Fe--B alloy enriched in Nd and B) under conditions to produce protectively coated, rapidly solidified, generally spherical alloy particles. Wherein a majority of the particles are produced/size classified within a given size fraction (e.g., 5 to 40 microns diameter) exhibiting optimum as-atomized magnetic properties and subjecting the particles to concurrent elevated temperature and elevated isotropic pressure for a time effective to yield a densified, magnetically isotropic magnet compact having enhanced magnetic properties and mechanical properties. 13 figures.

McCallum, R.W.; Dennis, K.W.; Lograsso, B.K.; Anderson, I.E.

1993-09-07T23:59:59.000Z

17

Permanent magnet multipole with adjustable strength  

DOE Patents (OSTI)

Two or more magnetically soft pole pieces are symmetrically positioned along a longitudinal axis to provide a magnetic field within a space defined by the pole pieces. Two or more permanent magnets are mounted to an external magnetically-soft cylindrical sleeve which rotates to bring the permanent magnets into closer coupling with the pole pieces and thereby adjustably control the field strength of the magnetic field produced in the space defined by the pole pieces. The permanent magnets are preferably formed of rare earth cobalt (REC) material which has a high remanent magnetic field and a strong coercive force. The pole pieces and the permanent magnets have corresponding cylindrical surfaces which are positionable with respect to each other to vary the coupling therebetween. Auxiliary permanent magnets are provided between the pole pieces to provide additional magnetic flux to the magnetic field without saturating the pole pieces.

Halbach, Klaus (Berkeley, CA)

1985-01-01T23:59:59.000Z

18

Gating of Permanent Molds for ALuminum Casting  

SciTech Connect

This report summarizes a two-year project, DE-FC07-01ID13983 that concerns the gating of aluminum castings in permanent molds. The main goal of the project is to improve the quality of aluminum castings produced in permanent molds. The approach taken was determine how the vertical type gating systems used for permanent mold castings can be designed to fill the mold cavity with a minimum of damage to the quality of the resulting casting. It is evident that somewhat different systems are preferred for different shapes and sizes of aluminum castings. The main problems caused by improper gating are entrained aluminum oxide films and entrapped gas. The project highlights the characteristic features of gating systems used in permanent mold aluminum foundries and recommends gating procedures designed to avoid common defects. The study also provides direct evidence on the filling pattern and heat flow behavior in permanent mold castings.

David Schwam; John F. Wallace; Tom Engle; Qingming Chang

2004-03-30T23:59:59.000Z

19

Permanent-magnet multipole with adjustable strength  

DOE Patents (OSTI)

Two or more magnetically soft pole pieces are symmetrically positioned along a longitudinal axis to provide a magnetic field within a space defined by the pole pieces. Two or more permanent magnets are mounted to an external magnetically-soft cylindrical sleeve which rotates to bring the permanent magnets into closer coupling with the pole pieces and thereby adjustably control the field strength of the magnetic field produced in the space defined by the pole pieces. The permanent magnets are preferably formed of rare earth cobalt (REC) material which has a high remanent magnetic field and a strong coercive force. The pole pieces and the permanent magnets have corresponding cylindrical surfaces which are positionable with respect to each other to vary the coupling there between. Auxiliary permanent magnets are provided between the pole pieces to provide additional magnetic flux to the magnetic field without saturating the pole pieces.

Halbach, K.

1982-09-20T23:59:59.000Z

20

On the Analysis of Reed Solomon Coding for Resilience to Transient/Permanent Faults in Highly Reliable Memories  

Science Journals Connector (OSTI)

Single Event Upsets (SEU) as well as permanent faults can significantly affect the correct on-line operation of digital systems, such as memories and microprocessors; a memory can be made resilient to permanent and transient faults by using modular redundancy ... Keywords: High Reliability Systems, Reliability Evaluation, Reed-Solomon Codes, Scrubbing, Dynamic Redundancy

L. Schiano; M. Ottavi; F. Lombardi; S. Pontarelli; A. Salsano

2005-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

A variable-field permanent-magnet dipole for accelerators  

SciTech Connect

A new concept for a variable-field permanent-magnet dipole has been developed and fabricated at Los Alamos. The application requires an extremely uniform dipole field in the magnet aperture and precision variability over a large operating range. An iron-core permanent- magnet design using a shunt that was specially shaped to vary the field in a precise and reproducible fashion with shunt position. The key to this design is in the shape of the shunt. The field as a function of shunt position is very linear from 90% of the maximum field to 20% of the minimum field. The shaped shunt also results in a small maximum magnetic force attracting the shunt to the yoke allowing a simple mechanical design. Calculated and measured results agree well for the magnet.

Kraus, R.H. Jr.; Barlow, D.B.; Meyer, R.

1992-01-01T23:59:59.000Z

22

A variable-field permanent-magnet dipole for accelerators  

SciTech Connect

A new concept for a variable-field permanent-magnet dipole has been developed and fabricated at Los Alamos. The application requires an extremely uniform dipole field in the magnet aperture and precision variability over a large operating range. An iron-core permanent- magnet design using a shunt that was specially shaped to vary the field in a precise and reproducible fashion with shunt position. The key to this design is in the shape of the shunt. The field as a function of shunt position is very linear from 90% of the maximum field to 20% of the minimum field. The shaped shunt also results in a small maximum magnetic force attracting the shunt to the yoke allowing a simple mechanical design. Calculated and measured results agree well for the magnet.

Kraus, R.H. Jr.; Barlow, D.B.; Meyer, R.

1992-09-01T23:59:59.000Z

23

Novel Flux Coupling Machine without Permanent Magnets - U Machine...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Novel Flux Coupling Machine without Permanent Magnets - U Machine Novel Flux Coupling Machine without Permanent Magnets - U Machine 2009 DOE Hydrogen Program and Vehicle...

24

National High Magnetic Field Laboratory Audio Dictionary: Permanent...  

NLE Websites -- All DOE Office Websites (Extended Search)

Permanent Magnet? Now Playing: What's a Permanent Magnet? Enable Javascript and Flash to stream the Magnet Minute Scott Hannahs Associated Links Magnets from Mini to Mighty Meet...

25

Permanent magnet edge-field quadrupole  

DOE Patents (OSTI)

Planar permanent magnet edge-field quadrupoles for use in particle accelerating machines and in insertion devices designed to generate spontaneous or coherent radiation from moving charged particles are disclosed. The invention comprises four magnetized rectangular pieces of permanent magnet material with substantially similar dimensions arranged into two planar arrays situated to generate a field with a substantially dominant quadrupole component in regions close to the device axis. 10 figs.

Tatchyn, R.O.

1997-01-21T23:59:59.000Z

26

Evaluation of permanent magnets for high temperature operations  

E-Print Network (OSTI)

250 276 300 25 60 0 Temperature ( C) Fig. B. Tractive Force per unit Volume of Ni Cylinder vs. Temperature for barium ferrite. 'I. 2 1. 'I 'I. O O. e 0. 6 0. 7 Unannaallad ~ m g 0. 4 0. 6 OA 0. 3 0. 2 0. 1 0. 0 Cooling A noalls 24... 425 4% 0 75 '100125150175200225250275 0 Temperature ( C) 0 20 a 30 + 10 x 40 v SO Fig. lla. Tractive Force per unit Volume of Ni Cylinder vs. Temperature for Alnico 8, annealled from 0 to 50 hours in 10 hour steps. M E u m m 0 &i 'o 0 8 u...

Van Hees, Elizabeth

2012-06-07T23:59:59.000Z

27

DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Test Finds Potential for Permanent Storage of Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams November 4, 2010 - 1:00pm Addthis Washington, DC - A field test sponsored by the U.S. Department of Energy (DOE) has demonstrated that opportunities to permanently store carbon in unmineable seams of lignite may be more widespread than previously documented. This finding supports national efforts to address climate change through long-term storage of CO2 in underground geologic reservoirs. Lowering the core barrel at the PCOR Partnership lignite site.The PCOR Partnership, one of seven partnerships in DOE's Regional Carbon Sequestration Partnership Program, collaborated with Eagle Operating Inc. (Kenmare, N.D.) to complete the field test in Burke County, N.D. In March

28

economic means to permanently store CO  

NLE Websites -- All DOE Office Websites (Extended Search)

economic means to permanently store CO economic means to permanently store CO 2 in unmineable coal seams. Prior to the injection, horizontal coalbed methane (CBM) wells were drilled approximately 1,200 to 1,800 feet underground in a five-spot pattern over a 200-acre area in the unmineable Upper Freeport coal seam. As part of this $13 million field trial, which is being conducted under the collaboration of the National Energy Technology Laboratory (NETL), West Virginia University, and CONSOL Energy, Inc., CO 2 will be injected at a pressure of up to 700 pounds per square inch (psi)

29

Performance improvement of permanent magnet ac motors  

E-Print Network (OSTI)

in selecting the switching states and finer adjustment of flux and torque. A sensorless direct torque control of five-phase permanent magnet motor is implemented. Speed information is obtained based on the position of stator flux linkages and load angle...

Parsa, Leila

2005-08-29T23:59:59.000Z

30

Permanent isolation surface barrier development plan  

SciTech Connect

The exhumation and treatment of wastes may not always be the preferred alternative in the remediation of a waste site. In-place disposal alternatives, under certain circumstances, may be the most desirable alternatives to use in the protection of human health and the environment. The implementation of an in-place disposal alternative will likely require some type of protective covering that will provide long-term isolation of the wastes from the accessible environment. Even if the wastes are exhumed and treated, a long-term barrier may still be needed to adequately dispose of the treated wastes or any remaining waste residuals. Currently, no {open_quotes}proven{close_quotes} long-term barrier is available. The Hanford Site Permanent Isolation Surface Barrier Development Program (BDP) was organized to develop the technology needed to provide a long-term surface barrier capability for the Hanford Site. The permanent isolation barrier technology also could be used at other sites. Permanent isolation barriers use engineered layers of natural materials to create an integrated structure with redundant protective features. Drawings of conceptual permanent isolation surface barriers are shown. The natural construction materials (e.g., fine soil, sand, gravel, riprap, asphalt) have been selected to optimize barrier performance and longevity. The objective of current designs is to use natural materials to develop a maintenance-free permanent isolation surface barrier that isolates wastes for a minimum of 1,000 years by limiting water drainage to near-zero amounts; reducing the likelihood of plant, animal, and human intrusion; controlling the exhalation of noxious gases; and minimizing erosion-related problems.

Wing, N.R.

1994-01-01T23:59:59.000Z

31

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

32

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

33

Control Realization for an Interior Permanent Magnet Synchronous Motor (IPMSM) in Automotive Drive Trains  

E-Print Network (OSTI)

Control Realization for an Interior Permanent Magnet Synchronous Motor (IPMSM) in Automotive Drive Trains Wilhelm Peters, Tobias Huber, Joachim Böcker Power Electronics and Electrical Drives, Paderborn automotive traction drives are a wide speed range, a wide constant-power operation range and high efficiency

Paderborn, Universität

34

Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013  

SciTech Connect

This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

Kerry L. Nisson

2012-10-01T23:59:59.000Z

35

In-situ magnetization of NdFeB magnets for permanent magnet machines  

SciTech Connect

In-situ magnetizers are needed to facilitate the assembly of permanent magnet machines and to remagnetize the magnets after weakening due to a fault condition. The air-core magnetizer in association with the silicon steel lamination structure of the rotor has advantages over its iron-core counterpart. This novel method has been used to magnetize the NdFeB magnets in a 30-hp permanent magnet synchronous motor. The magnetizing capability for different magnetizer geometries was investigated for the magnetization of NdFeB material. The design, testing, and operation of this magnetizer are reported in this paper.

Chang, L.; Eastham, T.R.; Dawson, G.E. (Dept. of Electrical Engineering, Queen's Univ., Kingston, Ontario K7L 3N6 (CA))

1991-09-01T23:59:59.000Z

36

When Do Commercial Reactors Permanently Shut Down?  

Reports and Publications (EIA)

For those wishing to obtain current data, the following resources are available: U.S. reactors, go to the Energy Information Administration's nuclear reactor shutdown list. (Note: As of April 30, 2010, the last U.S. reactor to permanently shut down was Big Rock Point in 1997.) Foreign Reactors, go to the Power Reactor Information System (PRIS) on the International Atomic Energy Agency's website.

2011-01-01T23:59:59.000Z

37

Permanent magnet design for high-speed superconducting bearings  

DOE Patents (OSTI)

A high temperature superconducting bearing including a permanent magnet rotor levitated by a high temperature superconducting structure is disclosed. The rotor preferably includes one or more concentric permanent magnet rings coupled to permanent magnet ring structures having substantially triangular and quadrangular cross-sections. Both alternating and single direction polarity magnet structures can be used in the bearing. 9 figs.

Hull, J.R.; Uherka, K.L.; Abdoud, R.G.

1996-09-10T23:59:59.000Z

38

Jiangxi Jinli Permanent Magnet Technology Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Jinli Permanent Magnet Technology Co Ltd Jinli Permanent Magnet Technology Co Ltd Jump to: navigation, search Name Jiangxi Jinli Permanent Magnet Technology Co Ltd Place Ganzhou, Jiangxi Province, China Sector Wind energy Product A China-based mining company for rare earth metals used in wind power generators. References Jiangxi Jinli Permanent Magnet Technology Co Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Jiangxi Jinli Permanent Magnet Technology Co Ltd is a company located in Ganzhou, Jiangxi Province, China . References ↑ "Jiangxi Jinli Permanent Magnet Technology Co Ltd" Retrieved from "http://en.openei.org/w/index.php?title=Jiangxi_Jinli_Permanent_Magnet_Technology_Co_Ltd&oldid=347439

39

Effect of Side Permanent Magnets for Reluctance Interior Permanent Magnet Reluctance Machines  

SciTech Connect

A traditional electric machine uses two dimensional magnetic flux paths in its rotor. This paper presents the development work on the utilization of the third dimension of a rotor. As an example, the air gap flux of a radial gap interior permanent magnet motor can be significantly enhanced by additional permanent magnets (PM) mounted at the sides of the rotor. A prototype motor built with this concept provided higher efficiency and required a shorter stator core length for the same power output as the Toyota/Prius traction drive motor.

Hsu, John S [ORNL; Lee, Seong T [ORNL; Wiles, Randy H [ORNL; Coomer, Chester [ORNL; Lowe, Kirk T [ORNL

2007-01-01T23:59:59.000Z

40

Strong permanent magnet-assisted electromagnetic undulator  

DOE Patents (OSTI)

This invention discloses an improved undulator comprising a plurality of electromagnet poles located along opposite sides of a particle beam axis with alternate north and south poles on each side of the beam to cause the beam to wiggle or undulate as it travels generally along the beam axis and permanent magnets spaced adjacent the electromagnetic poles on each side of the axis of said particle beam in an orientation sufficient to reduce the saturation of the electromagnet poles whereby the field strength of the electromagnet poles can be increased beyond the normal saturation levels of the electromagnetic poles.

Halbach, Klaus (Berkeley, CA)

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Counterrotating brushless dc permanent magnet motor  

SciTech Connect

An brushless DC permanent magnet motor is provided for driving an autonomous underwater vehicle. In one embodiment, the motor comprises four substantially flat stators disposed in stacked relationship, with pairs of the stators being axially spaced and each of the stators comprising a tape-wound stator coil; and a first and second substantially flat rotors disposed between the spaced pairs of stators. Each of the rotors includes an annular array of permanent magnets embedded therein. A first shaft is connected to the first rotor and a second, concentric shaft is connected to the second rotor, and drive unit causes rotation of the two shafts in opposite directions. The second shaft comprises a hollow tube having a central bore therein in which the first shaft is disposed. Two different sets of bearings support the first and second shAfts. In another embodiment, the motor comprises two ironless stators and pairs and rotors mounted no opposite sides of the stators and driven by counterrotating shafts.

Hawsey, R.A.; Bailey, J.M.

1990-12-31T23:59:59.000Z

42

Counterrotating brushless dc permanent magnet motor  

SciTech Connect

An brushless DC permanent magnet motor is provided for driving an autonomous underwater vehicle. In one embodiment, the motor comprises four substantially flat stators disposed in stacked relationship, with pairs of the stators being axially spaced and each of the stators comprising a tape-wound stator coil; and a first and second substantially flat rotors disposed between the spaced pairs of stators. Each of the rotors includes an annular array of permanent magnets embedded therein. A first shaft is connected to the first rotor and a second, concentric shaft is connected to the second rotor, and drive unit causes rotation of the two shafts in opposite directions. The second shaft comprises a hollow tube having a central bore therein in which the first shaft is disposed. Two different sets of bearings support the first and second shAfts. In another embodiment, the motor comprises two ironless stators and pairs and rotors mounted no opposite sides of the stators and driven by counterrotating shafts.

Hawsey, R.A.; Bailey, J.M.

1990-01-01T23:59:59.000Z

43

Radiation-Induced Demagnetization of Nd-Fe-B Permanent Magnets  

NLE Websites -- All DOE Office Websites (Extended Search)

LS-290 LS-290 Radiation-Induced Demagnetization of Nd-Fe-B Permanent Magnets J. Alderman and P.K. Job APS Operations Division Advanced Photon Source Argonne National Laboratory R.C. Martin, C.M. Simmons, and G.D. Owen Californium User Facility for Neutron Science Chemical Technology Division Oak Ridge National Laboratory J. Puhl Ionizing Radiation Division National Institute of Standards and Technology November 2000 work sponsored by U.S. DEPARTMENT OF ENERGY Office of Energy Research 1 Radiation-Induced Demagnetization of Nd-Fe-B Permanent Magnets J. Alderman and P.K. Job APS Operations Division Advanced Photon Source Argonne National Laboratory R.C. Martin, C.M. Simmons, and G. D. Owen Californium User Facility for Neutron Science

44

Analysis of Mechanically Milled Exchange Coupled Nanocomposite Permanent Magnets.  

E-Print Network (OSTI)

??Nanocomposite permanent magnets have recently evoked wide interest because of their interesting properties. They usually consist of a hard magnetic phase having superior coercivities and… (more)

Mukherjee, Santanu

2012-01-01T23:59:59.000Z

45

A New Class of Switched Reluctance Motors without Permanent Magnets...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A New Class of Switched Reluctance Motors without Permanent Magnets A Segmented Drive Inverter Topology with a Small DC Bus Capacitor A Segmented Drive Inverter Topology with a...

46

Electromagnetic Analysis of Rotating Permanent Magnet Exciters for Hydroelectric Generators.  

E-Print Network (OSTI)

??The purpose of this project is to analyse different design possibilities for a rotating permanent magnet exciter for a hydroelectric generator. This is done through… (more)

Nöland, Jonas

2013-01-01T23:59:59.000Z

47

NNSA Supports Permanent Threat Reduction in Ukraine through Alternativ...  

National Nuclear Security Administration (NNSA)

terrorism around the world. Converting or replacing isotopic devices with non-isotopic alternative technology achieves permanent threat reduction by decreasing the availability...

48

Variable-field permanent magnet dipole  

SciTech Connect

A new concept for a variable-field permanent-magnet dipole (VFPMD) has been designed, fabricated, and tested at Los Alamos. The VFPMD is a C-shaped sector magnet with iron poles separated by a large block of magnet material (SmCo). The central field can be continuously varied from 0.07 T to 0.3 T by moving an iron shunt closer or further away from the back of the magnet. The shunt is specially shaped to make the dependence of the dipole field strength on the shunt position as linear as possible. The dipole has a 2.8 cm high by 8 cm wide aperture with {approximately}10 cm long poles.

Barlow, D.B.; Kraus, R.H. Jr.; Meyer, R.E.

1993-10-01T23:59:59.000Z

49

Force and Stiffness of Passive Magnetic Bearings Using Permanent Magnets.  

E-Print Network (OSTI)

1 Force and Stiffness of Passive Magnetic Bearings Using Permanent Magnets. Part 2 : Radial Magnetization R. Ravaud, G. Lemarquand, V. Lemarquand Abstract This paper deals with the calculation of the force and the stiffness between two ring permanent magnets whose polarization is radial

Boyer, Edmond

50

Method and apparatus for assembling a permanent magnet pole assembly  

DOE Patents (OSTI)

A pole assembly for a rotor, the pole assembly includes a permanent magnet pole including at least one permanent magnet block, a plurality of laminations including a pole cap mechanically coupled to the pole, and a plurality of laminations including a base plate mechanically coupled to the pole.

Carl, Jr., Ralph James (Clifton Park, NY); Bagepalli, Bharat Sampathkumaran (Niskayuna, NY); Jansen, Patrick Lee (Scotia, NY); Dawson, Richard Nils (Voorheesville, NY); Qu, Ronghai (Clifton Park, NY); Avanesov, Mikhail Avramovich (Moscow, RU)

2009-08-11T23:59:59.000Z

51

Abstract--In this paper, the performances of a hybrid ex-citation flux switching permanent magnets synchronous  

E-Print Network (OSTI)

High efficiency, high power factor, high Tor- que/Volume ratio, high torque and speed operating points solution [3] while it combines the advantages of the permanent magnets machines and wound rotor synchronous iron parts, classical armature wind- ings and additional DC excitation coils situated above

Paris-Sud XI, Université de

52

The search for permanent electric dipole moments  

SciTech Connect

Permanent electric dipole moments (EDMs) of fundamental systems with spin - particles, nuclei, atoms or molecules violate parity and time reversal invariance. Invoking the CPT theorem, time reversal violation implies CP violation. Although CP-violation is implemented in the standard electro-weak theory, EDM generated this way remain undetectably small. However, this CP-violation also appears to fail explaining the observed baryon asymmetry of our universe. Extensions of the standard theory usually include new sources of CP violation and often predict sizeable EDMs. EDM searches in different systems are complementary and various efforts worldwide are underway and no finite value has been established yet. The prototype of an EDM search is the pursuit of the EDM of the neutron. It has the longest history and at the same time is at the forefront of present research. The talk aims at giving an overview of the field with emphasis on our efforts within an international collaboration at PSI, nedm.web.psi.ch.

Kirch, Klaus [PSI-Villigen - ETH Zürich

2013-02-13T23:59:59.000Z

53

A safety and regulatory assessment of generic BWR and PWR permanently shutdown nuclear power plants  

SciTech Connect

The long-term availability of less expensive power and the increasing plant modification and maintenance costs have caused some utilities to re-examine the economics of nuclear power. As a result, several utilities have opted to permanently shutdown their plants. Each licensee of these permanently shutdown (PSD) plants has submitted plant-specific exemption requests for those regulations that they believe are no longer applicable to their facility. This report presents a regulatory assessment for generic BWR and PWR plants that have permanently ceased operation in support of NRC rulemaking activities in this area. After the reactor vessel is defueled, the traditional accident sequences that dominate the operating plant risk are no longer applicable. The remaining source of public risk is associated with the accidents that involve the spent fuel. Previous studies have indicated that complete spent fuel pool drainage is an accident of potential concern. Certain combinations of spent fuel storage configurations and decay times, could cause freshly discharged fuel assemblies to self heat to a temperature where the self sustained oxidation of the zircaloy fuel cladding may cause cladding failure. This study has defined four spent fuel configurations which encompass all of the anticipated spent fuel characteristics and storage modes following permanent shutdown. A representative accident sequence was chosen for each configuration. Consequence analyses were performed using these sequences to estimate onsite and boundary doses, population doses and economic costs. A list of candidate regulations was identified from a screening of 10 CFR Parts 0 to 199. The continued applicability of each regulation was assessed within the context of each spent fuel storage configuration and the results of the consequence analyses.

Travis, R.J.; Davis, R.E.; Grove, E.J.; Azarm, M.A. [Brookhaven National Lab., Upton, NY (United States)

1997-08-01T23:59:59.000Z

54

Permanence : aligning architecture, nuclear waste, and the Public  

E-Print Network (OSTI)

Permanence is intended as a provocation to question the current relationship of time and architecture. Architecture has always had a relationship with time, but historically this relationship has been troubled. In 2013 we ...

Maher, John, III (John Edward)

2014-01-01T23:59:59.000Z

55

A novel high power density permanent magnet variable-speed motor  

SciTech Connect

This paper proposes a novel polyphase multipole permanent magnet motor which possesses high power density, high efficiency and excellent controllability, yet can be produced by conventional fabrication technique. The basic operating principles, design features, performance analysis and control system are described. The experimental results of a 5 kW, 1,500 rpm prototype motor and its comparison with other types of motors such as switched reluctance motor and induction motor are given. This proposed motor has the potential to compete in certain applications.

Chan, C.C.; Chen, G.H.; Jiang, J.Z.; Wang, X.Y. (Univ. of Hong Kong (Hong Kong))

1993-06-01T23:59:59.000Z

56

"Technologies to Ensure Permanent Geologic Carbon Storage,"  

NLE Websites -- All DOE Office Websites (Extended Search)

of carbon dioxide (CO of carbon dioxide (CO 2 ). DE-FOA-0000652, titled, "Technologies to Ensure Permanent Geologic Carbon Storage," addresses key geologic storage challenges and uncertainties that include improving and validating containment, improving injection operations, increasing reservoir storage efficiency, and mitigating potential releases of CO 2 from the engineered containment system. The following four technical areas of interest are addressed: Area of Interest 1 - Studies of Existing Wellbores Exposed to CO 2 ; Area of Interest 2 - Advanced Wellbore Integrity Technologies; Area of Interest 3 - Field Methods to Optimize Capacity and Ensure Storage Containment; and Area of Interest 4 - Enhanced Simulation Tools to Improve Predictions and

57

NETL: Permanence and Safety of CCS FAQs  

NLE Websites -- All DOE Office Websites (Extended Search)

What regulations are in place to govern CO2 injection(s)? What regulations are in place to govern CO2 injection(s)? In December 2010, EPA finalized minimum Federal requirements under the Safe Drinking Water Act (SDWA) for underground CO2 injection for the purpose of geologic storage. This final rule applies to owners or operators of wells that will be used to inject CO2 into the subsurface for the purpose of long-term storage. It establishes a new class of well, Class VI, and sets minimum technical criteria for the permitting, geologic site characterization, corrective action (if necessary), financial responsibility, well construction, operation, monitoring, well plugging, post-injection site care (PISC), and site closure of Class VI wells for the purposes of protecting underground sources of drinking water (USDWs). The elements of this rulemaking are based on the existing Underground Injection Control (UIC) regulatory framework, with modifications to address the unique nature of CO2 injection for geologic storage. This rule will help to ensure consistency in permitting underground CO2 injection at geologic storage operations across the United States and provide requirements to prevent endangerment of USDWs. In addition to these Federal requirements, many states have either enacted CCS requirements or are in the process of doing so. For example, Wyoming passed legislation in 2009 covering the general legislative framework, pore space ownership (including rights, limitations, and protections) and unitization. Liability legislation covering "post closure" and "long-term stewardship" are also covered. The Interstate Oil and Gas Compact Commission (IOGCC) has compiled all of these regulations and provides updates on their current status.

58

POLICY GUIDANCE MEMORANDUM #23 Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes  

Energy.gov (U.S. Department of Energy (DOE))

Policy Guidance Memorandum #23 - DOE Guidance – Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes

59

Method of making bonded or sintered permanent magnets  

DOE Patents (OSTI)

An isotropic permanent magnet is made by mixing a thermally responsive, low viscosity binder and atomized rare earth-transition metal (e.g., iron) alloy powder having a carbon-bearing (e.g., graphite) layer thereon that facilitates wetting and bonding of the powder particles by the binder. Prior to mixing with the binder, the atomized alloy powder may be sized or classified to provide a particular particle size fraction having a grain size within a given relatively narrow range. A selected particle size fraction is mixed with the binder and the mixture is molded to a desired complex magnet shape. A molded isotropic permanent magnet is thereby formed. A sintered isotropic permanent magnet can be formed by removing the binder from the molded mixture and thereafter sintering to full density. 14 figs.

McCallum, R.W.; Dennis, K.W.; Lograsso, B.K.; Anderson, I.E.

1995-11-28T23:59:59.000Z

60

Method of making bonded or sintered permanent magnets  

DOE Patents (OSTI)

An isotropic permanent magnet is made by mixing a thermally responsive, low viscosity binder and atomized rare earth-transition metal (e.g., iron) alloy powder having a carbon-bearing (e.g., graphite) layer thereon that facilitates wetting and bonding of the powder particles by the binder. Prior to mixing with the binder, the atomized alloy powder may be sized or classified to provide a particular particle size fraction having a grain size within a given relatively narrow range. A selected particle size fraction is mixed with the binder and the mixture is molded to a desired complex magnet shape. A molded isotropic permanent magnet is thereby formed. A sintered isotropic permanent magnet can be formed by removing the binder from the molded mixture and thereafter sintering to full density.

McCallum, R.W.; Dennis, K.W.; Lograsso, B.K.; Anderson, I.E.

1993-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Permanent-magnet-less machine having an enclosed air gap  

DOE Patents (OSTI)

A permanent magnet-less, brushless synchronous system includes a stator that generates a magnetic rotating field when sourced by an alternating current. An uncluttered rotor disposed within the magnetic rotating field is spaced apart from the stator to form an air gap relative to an axis of rotation. A stationary excitation core spaced apart from the uncluttered rotor by an axial air gap and a radial air gap substantially encloses the stationary excitation core. Some permanent magnet-less, brushless synchronous systems include stator core gaps to reduce axial flux flow. Some permanent magnet-less, brushless synchronous systems include an uncluttered rotor coupled to outer laminations. The quadrature-axis inductance may be increased in some synchronous systems. Some synchronous systems convert energy such as mechanical energy into electrical energy (e.g., a generator); other synchronous systems may convert any form of energy into mechanical energy (e.g., a motor).

Hsu, John S. (Oak Ridge, TN)

2012-02-07T23:59:59.000Z

62

A Novel Current Angle Control Scheme in a Current Source Inverter Fed Permanent Magnet Synchronous Motor Drive for Automotive Applications  

SciTech Connect

This paper describes a novel speed control scheme to operate a current source inverter (CSI) driven surface-mounted permanent magnet synchronous machine (SPMSM) for hybrid electric vehicles (HEVs) applications. The idea is to use the angle of the current vector to regulate the rotor speed while keeping the two dc-dc converter power switches on all the time to boost system efficiency. The effectiveness of the proposed scheme was verified with a 3 kW CSI-SPMSM drive prototype.

Tang, Lixin [ORNL] [ORNL; Su, Gui-Jia [ORNL] [ORNL

2011-01-01T23:59:59.000Z

63

Permanent Rules and Executive Orders effective as of 07-22-2010  

NLE Websites -- All DOE Office Websites (Extended Search)

Rules and Executive Orders effective as of 07-22-2010 Rules and Executive Orders effective as of 07-22-2010 Title 748 - Uniform Building Code Commission Chapter 1 Administrative Operations Chapter 3 General Provisions Chapter 5 Fees and Collection of Fees Chapter 7 Commission Committees Chapter 10 Code Adoption Procedures Chapter 15 Code Adopted by State Agencies and Political Subdivisions Permanent Rules and Executive Orders effective as of 07-22-2010 Title 748 - Uniform Building Code Commission Chapter 1 - Administrative Operations 748:1-1-1. Organization The employees of the Commission shall be organized and divided into such divisions or units, as the Commission deems desirable for efficiency. Such organization and division may be revised by the Commission as it finds necessary or expedient. Copies of the organizational chart are available upon

64

A high quality permanent-magnet wiggler for the Rocketdyne/Stanford infrared free electron laser  

Science Journals Connector (OSTI)

A high quality, variable gap, variable taper, permanent-magnet wiggler has been built for infrared free electron laser (FEL) experiments to be performed at the Stanford Photon Research Laboratory. The design and characterization procedure used to assemble the wiggler is discussed. A simulated annealing code was used to minimize field errors arising from variations in the individual magnets. The computed electron trajectories associated with the measured magnetic fields are presented for a range of different operating points of the wiggler. These plots indicate a very high quality field over a large range of different wiggler operating regimes. Resultant trajectory wander over the 2 m long wiggler for a 40 MeV electron at a wiggler gap corresponding to 3.3 kG was calculated to be less than 25 ?m. The ability to control trajectory wander and optical phase slip using the simulated annealing code suggests future extensions to extremely long wigglers.

Mark S. Curtin; Anup Bhowmik; Wayne A. McMullin; Stephen V. Benson; John M.J. Madey; Bruce A. Richman; Louis Vintro

1988-01-01T23:59:59.000Z

65

Permanent Magnet Ecr Plasma Source With Magnetic Field Optimization  

DOE Patents (OSTI)

In a plasma-producing device, an optimized magnet field for electron cyclotron resonance plasma generation is provided by a shaped pole piece. The shaped pole piece adjusts spacing between the magnet and the resonance zone, creates a convex or concave resonance zone, and decreases stray fields between the resonance zone and the workpiece. For a cylindrical permanent magnet, the pole piece includes a disk adjacent the magnet together with an annular cylindrical sidewall structure axially aligned with the magnet and extending from the base around the permanent magnet. The pole piece directs magnetic field lines into the resonance zone, moving the resonance zone further from the face of the magnet. Additional permanent magnets or magnet arrays may be utilized to control field contours on a local scale. Rather than a permeable material, the sidewall structure may be composed of an annular cylindrical magnetic material having a polarity opposite that of the permanent magnet, creating convex regions in the resonance zone. An annular disk-shaped recurve section at the end of the sidewall structure forms magnetic mirrors keeping the plasma off the pole piece. A recurve section composed of magnetic material having a radial polarity forms convex regions and/or magnetic mirrors within the resonance zone.

Doughty, Frank C. (Plano, TX); Spencer, John E. (Plano, TX)

2000-12-19T23:59:59.000Z

66

Permanent magnet assisted synchronous reluctance motor, design and performance improvement  

E-Print Network (OSTI)

with the design optimization of the Permanent Magnet Assisted Synchronous Reluctance Motor (PMa-SynRM). Various key points in the rotor design of a low cost PMa-SynRM are introduced and their effects are studied. Finite element approach has been utilized to show...

Niazi, Peyman

2006-04-12T23:59:59.000Z

67

A Permanent-Magnet Microwave Ion Source for a Compact High-Yield Neutron Generator  

SciTech Connect

We present recent work on the development of a microwave ion source that will be used in a high-yield compact neutron generator for active interrogation applications. The sealed tube generator will be capable of producing high neutron yields, 5x1011 n/s for D-T and ~;;1x1010 n/s for D-D reactions, while remaining transportable. We constructed a microwave ion source (2.45 GHz) with permanent magnets to provide the magnetic field strength of 87.5 mT necessary for satisfying the electron cyclotron resonance (ECR) condition. Microwave ion sources can produce high extracted beam currents at the low gas pressures required for sealed tube operation and at lower power levels than previously used RF-driven ion sources. A 100 mA deuterium/tritium beam will be extracted through a large slit (60x6 mm2) to spread the beam power over a larger target area. This paper describes the design of the permanent-magnet microwave ion source and discusses the impact of the magnetic field design on the source performance. The required equivalent proton beam current density of 40 mA/cm2 was extracted at a moderate microwave power of 400 W with an optimized magnetic field.

Waldmann, Ole; Ludewigt, Bernhard

2010-10-11T23:59:59.000Z

68

Axial gap permanent-magnet machine with reluctance poles and PM element covers  

SciTech Connect

An electric machine (10) has a disk-shaped rotor (24) disposed in an operating space between two opposing stator assemblies (11, 12) to provide two axial air gaps (15, 16). The rotor (24) has a hub (28) and an outer ring (26) of non-magnetic material and is further provided with a plurality of permanent magnetic elements (25) for coupling flux that is induced by the magnetic field of the stator assemblies (11, 12). The permanent magnetic elements (25) are spaced apart and reluctance poles (27) are positioned in spaces between the magnetic elements (25) to couple additional flux induced by the magnetic field of the stator assemblies (11, 12). Various constructions and shapes (40-45) for the PM magnetic elements (25) are disclosed, and including PM covers (60) of ferromagnetic material for enhancing q-axis flux in the air gaps (15, 16) and for reducing harmonics where toothed stators are used. Methods of providing increased torque using the the various rotor constructions are also disclosed.

Hsu, John S [Oak Ridge, TN; McKeever, John W [Oak Ridge, TN

2009-04-07T23:59:59.000Z

69

A basis of settlement: Economic foundations of permanent pioneer communities. [Lunar settlement  

SciTech Connect

High transport costs will dominate the pattern of lunar development. During the earliest phases, when lunar facilities consist of a research and resource development complex with staff serving tours of a few months, transport costs will encourage local production of food, fuel, and building materials. Once these capabilities are in place and the number of personnel grows to a few hundred, staff rotation might well dominate transport budgets. At that point it would make economic sense to encourage some members of staff to become permanent residents. By analogy with early British settlement in Australia, a vigorous private sector economy could emerge if the lunar organization provided quasi-export earning through its role as the community's major employer and as the major buyer of locally-produced goods. By providing such a market for goods and services, the lunar organization would not only provide a means whereby permanent residents would support themselves but could also accelerate the process of replacing imported goods with local manufactures, thereby reducing the cost of operations. By analogy with recent Alaskan experience, if the resource development activity started making money from sales to orbital customers, severance taxes and/or royalty payments could also provide means by which a lunar community could support itself.

Jones, E.M.

1988-01-01T23:59:59.000Z

70

Modelling and design of an eddy current coupling for slip-synchronous permanent magnet wind generators.  

E-Print Network (OSTI)

??ENGLISH ABSTRACT: Slip-synchronous permanent magnet generators (SS-PMG) is a recently proposed direct-grid connected direct-drive generator topology for wind power applications. It combines a permanent magnet… (more)

Mouton, Zac

2013-01-01T23:59:59.000Z

71

Investigation of Flux Linkage Profile Measurement Methods for Switched Reluctance Motors and Permanent Magnet  

E-Print Network (OSTI)

- 1 - Investigation of Flux Linkage Profile Measurement Methods for Switched Reluctance Motors for switched reluctance motors (SRM's) and permanent magnet motors (PMM's). Various measurement methods have reluctance motors, permanent magnet motors. I. INTRODUCTION Switched Reluctance Motors (SRM's) have very

Lu, Kaiyuan

72

An issue of permanence: assessing the effectiveness of temporary carbon storage  

E-Print Network (OSTI)

In this paper, we present a method to quantify the effectiveness of carbon mitigation options taking into account the "permanence" of the emissions reduction. While the issue of permanence is most commonly associated with ...

Herzog, Howard J.

73

Grain Refinement of Permanent Mold Cast Copper Base Alloys  

SciTech Connect

Grain refinement is a well established process for many cast and wrought alloys. The mechanical properties of various alloys could be enhanced by reducing the grain size. Refinement is also known to improve casting characteristics such as fluidity and hot tearing. Grain refinement of copper-base alloys is not widely used, especially in sand casting process. However, in permanent mold casting of copper alloys it is now common to use grain refinement to counteract the problem of severe hot tearing which also improves the pressure tightness of plumbing components. The mechanism of grain refinement in copper-base alloys is not well understood. The issues to be studied include the effect of minor alloy additions on the microstructure, their interaction with the grain refiner, effect of cooling rate, and loss of grain refinement (fading). In this investigation, efforts were made to explore and understand grain refinement of copper alloys, especially in permanent mold casting conditions.

M.Sadayappan; J.P.Thomson; M.Elboujdaini; G.Ping Gu; M. Sahoo

2005-04-01T23:59:59.000Z

74

Disc rotors with permanent magnets for brushless DC motor  

SciTech Connect

A brushless dc permanent magnet motor drives an autonomous underwater vehe. In one embodiment, the motor comprises four substantially flat stators in stacked relationship, with pairs of the stators axially spaced, each of the stators comprising a tape-wound stator coil, and first and second substantially flat rotors disposed between the spaced pairs of stators. Each of the rotors includes an annular array of permanent magnets embedded therein. A first shaft is connected to the first rotor and a second, concentric shaft is connected to the second rotor, and a drive unit causes rotation of the two shafts in opposite directions. The second shaft comprises a hollow tube having a central bore in which the first shaft is disposed. Two different sets of bearings support the first and second shafts. In another embodiment, the motor comprises two ironless stators and pairs of rotors mounted on opposite sides of the stators and driven by counterrotating shafts.

Hawsey, Robert A. (Oak Ridge, TN); Bailey, J. Milton (Knoxville, TN)

1992-01-01T23:59:59.000Z

75

System Cost Analysis for an Interior Permanent Magnet Motor  

SciTech Connect

The objective of this program is to provide an assessment of the cost structure for an interior permanent magnet ('IPM') motor which is designed to meet the 2010 FreedomCAR specification. The program is to evaluate the range of viable permanent magnet materials for an IPM motor, including sintered and bonded grades of rare earth magnets. The study considers the benefits of key processing steps, alternative magnet shapes and their assembly methods into the rotor (including magnetization), and any mechanical stress or temperature limits. The motor's costs are estimated for an annual production quantity of 200,000 units, and are broken out into such major components as magnetic raw materials, processing and manufacturing. But this is essentially a feasibility study of the motor's electromagnetic design, and is not intended to include mechanical or thermal studies as would be done to work up a selected design for production.

Peter Campbell

2008-08-01T23:59:59.000Z

76

Design improvements of a permanent magnet active magnetic refrigerator  

Science Journals Connector (OSTI)

Abstract A second-generation room-temperature permanent magnet active magnetic regenerator test apparatus using Halbach arrays is described. The magnet arrays consist of three concentric cylinders. Each cylinder is constructed using 12 permanent magnet segments. The inner magnet array is stationary while the intermediate and outer arrays are designed to rotate in opposite directions so as to create a sinusoidal magnetic field waveform with a stationary field direction. The fluid flow system utilizes a novel check valve configuration so that fluid dead volumes are minimized. The system construction is modular to allow for quick replacement of material or system components. Fringing fields near the outer and inner diameters of the arrays are found to create large forces between arrays leading to large torques. Test results using 650 g of gadolinium spheres produce a no-load temperature span of 33 K at 0.8 Hz.

D.S. Arnold; A. Tura; A. Ruebsaat-Trott; A. Rowe

2014-01-01T23:59:59.000Z

77

depleted underground oil shale for the permanent storage of carbon  

NLE Websites -- All DOE Office Websites (Extended Search)

depleted underground oil shale for the permanent storage of carbon depleted underground oil shale for the permanent storage of carbon dioxide (CO 2 ) generated during the oil shale extraction process. AMSO, which holds a research, development, and demonstration (RD&D) lease from the U.S. Bureau of Land Management for a 160-acre parcel of Federal land in northwest Colorado's oil-shale rich Piceance Basin, will provide technical assistance and oil shale core samples. If AMSO can demonstrate an economically viable and environmentally acceptable extraction process, it retains the right to acquire a 5,120-acre commercial lease. When subject to high temperatures and high pressures, oil shale (a sedimentary rock that is rich in hydrocarbons) can be converted into oil. Through mineralization, the CO 2 could be stored in the shale

78

Disc rotors with permanent magnets for brushless dc motor  

SciTech Connect

This patent describes a brushless dc permanent magnet motor for driving an autonomous underwater vehicle. It comprises first and second substantially flat, generally cylindrical stators disposed in side by side relation; a first substantially flat, generally cylindrical rotor; a first shaft connected to the first rotor and a second, concentric shaft connected to the second rotor; and means for providing rotation of the first and second shafts in opposite directions.

Hawsey, R.A.; Bailery, J.M.

1992-05-26T23:59:59.000Z

79

Permanent magnet machine with windings having strand transposition  

DOE Patents (OSTI)

This document discusses, among other things, a stator with transposition between the windings or coils. The coils are free from transposition to increase the fill factor of the stator slots. The transposition at the end connections between an inner coil and an outer coil provide transposition to reduce circulating current loss. The increased fill factor reduces further current losses. Such a stator is used in a dual rotor, permanent magnet machine, for example, in a compressor pump, wind turbine gearbox, wind turbine rotor.

Qu, Ronghai (Clifton Park, NY); Jansen, Patrick Lee (Scotia, NY)

2009-04-21T23:59:59.000Z

80

Design of Double Salient Interior Permanent Magnet Machine Based on Mutually Coupled  

E-Print Network (OSTI)

Design of Double Salient Interior Permanent Magnet Machine Based on Mutually Coupled Reluctance--This paper presents a novel structure of double salient interior permanent magnet machine (DSIPM machine-- double salient, d-axis and q-axis inductances, cogging torque, permanent magnets, flux

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Recent developments and open problems in the theory of permanents1  

E-Print Network (OSTI)

Recent developments and open problems in the theory of permanents1 R. B. Bapat Indian Statistical of permanents over these three classes, putting 1 Presidential Address (Technical), Indian Mathematical Society at the end that point to several sources dealing with various aspects of the theory of permanents. 2 Matrices

Bapat, Ravindra B.

82

Strong permanent magnets provide a backbone technology required many products, including computers, electric cars, and  

E-Print Network (OSTI)

, electric cars, and wind-powered generators. Currently, the strongest permanent magnets contain rare earth for most technologies requiring permanent magnets, due to their high energy product and coercivity. However, and the extreme price volatility in recent years have led scientists to seek alternative formulas for permanent

McQuade, D. Tyler

83

Indirect rotor position sensing in real time for brushless permanent magnet motor drives  

SciTech Connect

This paper describes a modern solution to real-time rotor position estimation of brushless permanent magnet (PM) motor drives. The position estimation scheme, based on flux linkage and line-current estimation, is implemented in real time by using the abc reference frame, and it is tested dynamically. The position estimation model of the test motor, development of hardware, and basic operation of the digital signal processor (DSP) are discussed. The overall position estimation strategy is accomplished with a fast DSP (TMS320C30). The method is a shaft position sensorless method that is applicable to a wide range of excitation types in brushless PM motors without any restriction on the motor model and the current excitation. Both rectangular and sinewave-excited brushless PM motor drives are examined, and the results are given to demonstrate the effectiveness of the method with dynamic loads in closed estimated position loop.

Ertugrul, N. [Univ. of Adelaide (Australia). Dept. of Electrical and Electronic Engineering] [Univ. of Adelaide (Australia). Dept. of Electrical and Electronic Engineering; Acarnley, P.P. [Univ. of Newcastle upon Tyne (United Kingdom). Dept. of Electrical and Electronic Engineering] [Univ. of Newcastle upon Tyne (United Kingdom). Dept. of Electrical and Electronic Engineering

1998-07-01T23:59:59.000Z

84

Operations Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards BPA Operations Information (OPI) Transmission Services operates and plans for regional and national system needs. Transmission Services coordinates system operation and...

85

A strong permanent magnet-assisted electromagnetic undulator  

DOE Patents (OSTI)

This invention discloses an improved undulator comprising a plurality of electromagnet poles located along opposite sides of a particle beam axis with alternate north and south poles on each side of the beam to cause the beam to wiggle or undulate as it travels generally along the beam axis and permanent magnets spaced adjacent the electromagnetic poles on each side of the axis of said particle beam in an orientation sufficient to reduce the saturation of the electromagnet poles whereby the field strength of the electromagnet poles can be increased beyond the normal saturation levels of the electromagnetic poles. 4 figs.

Halbach, K.

1987-01-30T23:59:59.000Z

86

A mesoscopic network model for permanent set in crosslinked elastomers  

SciTech Connect

A mesoscopic computational model for polymer networks and composites is developed as a coarse-grained representation of the composite microstructure. Unlike more complex molecular dynamics simulations, the model only considers the effects of crosslinks on mechanical behavior. The elastic modulus, which depends only on the crosslink density and parameters in the bond potential, is consistent with rubber elasticity theory, and the network response satisfies the independent network hypothesis of Tobolsky. The model, when applied to a commercial filled silicone elastomer, quantitatively reproduces the experimental permanent set and stress-strain response due to changes in the crosslinked network from irradiation.

Weisgraber, T H; Gee, R H; Maiti, A; Clague, D S; Chinn, S; Maxwell, R S

2009-01-29T23:59:59.000Z

87

Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation  

SciTech Connect

In a conventional permanent magnet (PM) machine, the air-gap flux produced by the PM is fixed. It is difficult to enhance the air-gap flux density due to limitations of the PM in a series-magnetic circuit. However, the air-gap flux density can be weakened by using power electronic field weakening to the limit of demagnetization of the PMs. This paper presents the test results of controlling the PM air-gap flux density through the use of a stationary brushless excitation coil in a reluctance interior permanent magnet with brushless field excitation (RIPM-BFE) motor. Through the use of this technology the air-gap flux density can be either enhanced or weakened. There is no concern with demagnetizing the PMs during field weakening. The leakage flux of the excitation coil through the PMs is blocked. The prototype motor built on this principle confirms the concept of flux enhancement and weakening through the use of excitation coils.

Wiles, R.H.

2005-10-07T23:59:59.000Z

88

Two Permanently Congruent Rods May Have Different Proper Lengths  

E-Print Network (OSTI)

We scrutinize congruence as one of the basic definitions of equality in geometry and pit it against physics of Special Relativity. We show that two non-rigid rods permanently kept congruent during their common expansion or compression may have different instantaneous proper lengths (when measured at the same time of their respective reference clocks) if they have different mass distributions over their lengths. Alternatively, their proper lengths can come out equal only when measured at different but strictly correlated moments of time of their respective clocks. The derived expression for the ratio of instantaneous proper lengths of two permanently congruent changing objects explicitly contains information about the objects mass distribution. The same is true for the ratio of readings of the two reference clocks, for which the instantaneous measurements of respective proper lengths produce the same result. In either case the characteristics usually considered as purely kinematic depend on mass distribution, which is a dynamic property. This is a spectacular demonstration of dynamic aspect of geometry already in the framework of Special Relativity.

Moses Fayngold

2008-07-06T23:59:59.000Z

89

Multiphysics 3D Modelling of Ironless Permanent Magnet Generators  

Science Journals Connector (OSTI)

Abstract Analytical method is widely used for the preliminary design and optimization of electrical machines. It has short calculation time and low computational cost (cost of simulation codes and supporting hardware), but the calculate result is normally considered to be not as accurate as finite element method (FEM). On the other hand, it is time-consuming to optimize machines with FEM if the optimization is not parallelized. Parallelizing optimization requires many licenses when commercial FEM codes are used, which can be very expensive. Ironless permanent magnet generator has large diameter and small aspect ratio, therefore, multiphysics approach is expected to be used for investigating the magnetic and thermal field. To address the above challenges, this paper presents a multiphysics modelling strategy for the design and optimization of ironless permanent magnet generators. Open-source codes are used to reduce the computational cost. A design example is presented to demonstrate the detail of this design method. This approach is expected to be used in super computer in the future, so that the calculation time can be largely reduced.

Z. Zhang; S.M. Muyeen; A. Al-Durra; R. Nilssen; A. Nysveen

2014-01-01T23:59:59.000Z

90

STATIC AND DYNAMIC MEASUREMENTS OF A PERMANENT MAGNET INDUCTION GENERATOR: TEST RESULTS OF A NEW WIND GENERATOR CONCEPT  

Science Journals Connector (OSTI)

The Permanent Magnet Induction Machine, a new wind generator concept, is considered to be a highly...

Gabriele Gail; Thomas Hartkopf…

2006-01-01T23:59:59.000Z

91

Design Assessments of a Magnetic-geared Double-rotor Permanent Magnet Generator.  

E-Print Network (OSTI)

??The purpose of this research is to provide systematic design of a permanent magnet (PM) generator, by adopting the double-rotor and the coaxial magnetic gear… (more)

Chung, He-Yu

2013-01-01T23:59:59.000Z

92

E-Print Network 3.0 - adjustable permanent quadrupoles Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

is performed in 82 cells with Permanent Magnet Quadrupoles. Further... Proton Synchroton Booster. The acceleration is performed up to 3 MeV by a Radio- Frequency...

93

Vehicle Technologies Office Merit Review 2014: Permanent Magnet Development for Automotive Traction Motors  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Ames Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about permanent magnet development...

94

Calculations on permanent-magnet quadrupoles with nonrectangular cross section  

SciTech Connect

The current trend toward higher frequencies to power drift-tube linacs (DTLs) and coupled-cavity linacs (CCLs) reduces the space available for quadrupole focusing magnets. Similarly, the space available for matching sections between linac sections is limited, and often the matching section bunchers are designed in odd shapes to make them fit. This shaping further restricts focusing magnet space. One approach to attaining sufficient quadrupole strength is such situations is to use rare-earth permanent-magnet quadrupoles (PMQs) with cross sections tailored to fill as much of the available space as possible. In this paper, we describe some techniques we have developed to calculate the properties of such magnets both singly and when other magnets are nearby. 3 refs., 4 figs.

Boicourt, G.P.; Merson, J.L.

1988-01-01T23:59:59.000Z

95

Complex foamed aluminum parts as permanent cores in aluminum castings  

SciTech Connect

The feasibility of complex shaped aluminum foam parts as permanent cores in aluminum castings has been investigated. The foamed samples were prepared by injection of the foam into sand molds. It turned out that sound castings can be produced if the foam core is properly preheated and/or surface treated before casting. The effect of the foam core on the performance of the casting was evaluated by in compression testing and by measuring structural damping. The gain in the related properties turned out to be much higher than the weight increase of the casting due to the presence of the core. The weight increase may be partially offset through a reduction of the wall-thickness of the shell.

Simancik, F. [Inst. of Materials and Machine Mechanics, Bratislava (Slovakia); Schoerghuber, F. [Illichmann GmbH, Altmuenster (Austria)

1998-12-31T23:59:59.000Z

96

Innovative Sensors for Pipeline Crawlers: Rotating Permanent Magnet Inspection  

SciTech Connect

Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they may encounter. To facilitate inspection of these ''unpiggable'' pipelines, recent inspection development efforts have focused on a new generation of powered inspection platforms that are able to crawl slowly inside a pipeline and can maneuver past the physical barriers that limit internal inspection applicability, such as bore restrictions, low product flow rate, and low pressure. The first step in this research was to review existing inspection technologies for applicability and compatibility with crawler systems. Most existing inspection technologies, including magnetic flux leakage and ultrasonic methods, had significant implementation limitations including mass, physical size, inspection energy coupling requirements and technology maturity. The remote field technique was the most promising but power consumption was high and anomaly signals were low requiring sensitive detectors and electronics. After reviewing each inspection technology, it was decided to investigate the potential for a new inspection method. The new inspection method takes advantage of advances in permanent magnet strength, along with their wide availability and low cost. Called rotating permanent magnet inspection (RPMI), this patent pending technology employs pairs of permanent magnets rotating around the central axis of a cylinder to induce high current densities in the material under inspection. Anomalies and wall thickness variations are detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. This inspection method is an alternative to the common concentric coil remote field technique that induces low-frequency eddy currents in ferromagnetic pipes and tubes. Since this is a new inspection method, both theory and experiment were used to determine fundamental capabilities and limitations. Fundamental finite element modeling analysis and experimental investigations performed during this development have led to the derivation of a first order analytical equation for designing rotating magnetizers to induce current and positioning sensors to record signals from anomalies. Experimental results confirm the analytical equation and the finite element calculations provide a firm basis for the design of RPMI systems. Experimental results have shown that metal loss anomalies and wall thickness variations can be detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. The design exploits the phenomenon that circumferential currents are easily detectable at distances well away from the magnets. Current changes at anomalies were detectable with commercial low cost Hall Effect sensors. Commercial analog to digital converters can be used to measure the sensor output and data analysis can be performed in real time using PC computer systems. The technology was successfully demonstrated during two blind benchmark tests where numerous metal loss defects were detected. For this inspection technology, the detection threshold is a function of wall thickness and corrosion depth. For thinner materials, the detection threshold was experimentally shown to be comparable to magnetic flux leakage. For wall thicknesses greater than three tenths of an inch, the detection threshold increases with wall thickness. The potential for metal loss anomaly sizing was demonstrated in the second benchmarking study, again with accuracy comparable to existing magnetic flux leakage technologies. The rotating permanent magnet system has the potential for inspecting unpiggable pipelines since the magnetizer configurations can be sufficiently small with respect to the bore of the pipe to pass obstructions that limit the application of many i

J. Bruce Nestleroth; Richard J. Davis; Stephanie Flamberg

2006-09-30T23:59:59.000Z

97

GRAIN REFINEMENT OF PERMANENT MOLD CAST COPPER BASE ALLOYS  

SciTech Connect

Grain refinement behavior of copper alloys cast in permanent molds was investigated. This is one of the least studied subjects in copper alloy castings. Grain refinement is not widely practiced for leaded copper alloys cast in sand molds. Aluminum bronzes and high strength yellow brasses, cast in sand and permanent molds, were usually fine grained due to the presence of more than 2% iron. Grain refinement of the most common permanent mold casting alloys, leaded yellow brass and its lead-free replacement EnviroBrass III, is not universally accepted due to the perceived problem of hard spots in finished castings and for the same reason these alloys contain very low amounts of iron. The yellow brasses and Cu-Si alloys are gaining popularity in North America due to their low lead content and amenability for permanent mold casting. These alloys are prone to hot tearing in permanent mold casting. Grain refinement is one of the solutions for reducing this problem. However, to use this technique it is necessary to understand the mechanism of grain refinement and other issues involved in the process. The following issues were studied during this three year project funded by the US Department of Energy and the copper casting industry: (1) Effect of alloying additions on the grain size of Cu-Zn alloys and their interaction with grain refiners; (2) Effect of two grain refining elements, boron and zirconium, on the grain size of four copper alloys, yellow brass, EnviroBrass II, silicon brass and silicon bronze and the duration of their effect (fading); (3) Prediction of grain refinement using cooling curve analysis and use of this method as an on-line quality control tool; (4) Hard spot formation in yellow brass and EnviroBrass due to grain refinement; (5) Corrosion resistance of the grain refined alloys; (6) Transfer the technology to permanent mold casting foundries; It was found that alloying elements such as tin and zinc do not change the grain size of Cu-Zn alloys. Aluminum promoted b phase formation and modified the grain structure from dendritic to equiaxed. Lead or bismuth reduces the size of grains, but not change the morphology of the structure in Cu-Zn alloys. The grain size of the Cu-Zn-alloy can be reduced from 3000 mm to 300 mm after the addition of aluminum and lead. Similar effects were observed in EnviroBrass III after the addition of aluminum and bismuth. Boron refined the structure of yellow brasses in the presence of iron. At least 50 ppm of iron and 3 ppm of boron are necessary to cause grain refinement in these alloys. Precipitation of iron from the melt is identified as the cause of grain refinement. Boron initiates the precipitation of iron which could not be explained at this time. On the other hand zirconium causes some reduction in grain size in all four alloys investigated. The critical limit for the zirconium was found to be around 100 ppm below which not much refinement could be observed. The mechanism of grain refinement in the presence of zirconium could not be explained. Grain refinement by boron and iron can remain over a long period of time, at least for 72 hours of holding or after remelting few times. It is necessary to have the iron and boron contents above the critical limits mentioned earlier. On the other hand, refinement by zirconium is lost quite rapidly, some times within one hour of holding, mostly due to the loss of zirconium, most probably by oxidation, from the melt. In all the cases it is possible to revive the refinement by adding more of the appropriate refining element. Cooling curve analysis (thermal analysis) can be used successfully to predict the grain refinement in yellow brasses. The precipitation of iron in the liquid metal causes the metal to solidify without undercooling. Absence of this reaction, as indicated by the time-temperature (t-T) and its first derivative (dt/dT) curves, proved to be an indicator of refinement. The viability of the technique as an on-line quality control tool was proved in two foundries. The method can also correctly predict the onset of fading. Th

M. SADAYAPPAN, J.P. THOMSON, M.ELBOUJDAINI, G. PING GU, M. SAHOO

2004-04-29T23:59:59.000Z

98

A PERMANENT A PERMANENT  

E-Print Network (OSTI)

of study to creating student-led "Changemaker Central" locations to drive impactful social innovation

McGraw, Kevin J.

99

Permanent Plots PERMANENT PLOTS  

E-Print Network (OSTI)

plots at Butte Camp, Pine Creek, Pumice Plain, Abraham Plain and Studebaker Ridge. These plots provide. The four Pumice Plain Plots are on an elevation gradient. Prior to1989 there was very scant vegetation with dense lupines in that year. The Abraham Plain was even sparser (the grid started in 1988) was virtually

del Moral, Roger

100

Design of optimal digital controller for stable super-high-speed permanent-magnet synchronous  

E-Print Network (OSTI)

Design of optimal digital controller for stable super-high-speed permanent-magnet synchronous motor collaborative design scheme of a super-high-speed permanent-magnet synchronous motor (PMSM) and its digital is an attractive solution for super-high-speed PMSMs because of its inherent lack of mechanical shaft sensors

Wu, Thomas

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Permanent-magnet helicon sources and arrays: a new type of rf plasma Francis F. Chena)  

E-Print Network (OSTI)

Permanent-magnet helicon sources and arrays: a new type of rf plasma Francis F. Chena) and Humberto mechanism of RF coupling. However, the requirement of a dc magnetic field has prevented their wide acceptance in industry. The use of permanent magnets greatly simplifies helicon sources, and arrays of small

Chen, Francis F.

102

MULTI-WATT ELECTRIC POWER FROM A MICROFABRICATED PERMANENT-MAGNET GENERATOR  

E-Print Network (OSTI)

MULTI-WATT ELECTRIC POWER FROM A MICROFABRICATED PERMANENT-MAGNET GENERATOR S. Das1 , D. P. Arnold2 presents the design, fabrication, and characterization of permanent-magnet (PM) generators for use, coupled to a transformer and rectifier, delivers 1.1 W of DC electrical power to a resistive load

103

Permanent-magnet helicon sources and arrays: A new type of rf plasmaa... Francis F. Chenb  

E-Print Network (OSTI)

Permanent-magnet helicon sources and arrays: A new type of rf plasmaa... Francis F. Chenb mechanism of rf coupling. However, the requirement of a dc magnetic field has prevented their wide acceptance in industry. The use of permanent magnets greatly simplifies helicon sources, and arrays of small

Chen, Francis F.

104

Selecting the appropriate input data set when configuring a permanent workforce  

E-Print Network (OSTI)

of new personnel planning and scheduling problems for management. With over 70% of the global workforceSelecting the appropriate input data set when configuring a permanent workforce Jonathan F. Bard to use when running a scheduling model to select a permanent workforce for a service facility. Because

Bard, Jonathan

105

Magnetic Field Created by Tile Permanent R. Ravaud, G. Lemarquand, V. Lemarquand  

E-Print Network (OSTI)

1 Magnetic Field Created by Tile Permanent Magnets R. Ravaud, G. Lemarquand, V. Lemarquand Abstract1 This paper presents the analytical calculation of the three components of the magnetic field created by2 tile permanent magnets whose magnetization is either radial or axial. The calculations

Boyer, Edmond

106

COMPARAISON DES PERFORMANCES DE DEUX MOTEURS LECTRIQUES AUTOPILOTS : LE MOTEUR SYNCHRONE AIMANTS PERMANENTS  

E-Print Network (OSTI)

SELF COMMUTATED ELECTRIC MOTORS : THE PERMANENT MAGNET BRUSHLESS DC MOTOR THE SWITCHED RELUCTANCE MOTOR synchronous brushless motors. These motors are, on one hand, the permanent-magnet brushless DC motor supplied, on the other hand, the doubly salient reluctance motor fed by quasi-square currents at low speed, and by full

Paris-Sud XI, Université de

107

POLICY GUIDANCE MEMORANDUM #23 Permanent and Nonpermanent Positions...  

Energy Savers (EERE)

MEMORANDUM 02 Using Schedule A Hiring Authority for ARRA Positions (Expired) Handbook on Overseas Assignments Operational Plan and Desktop Reference for the Veterans...

108

Questions and Answers - Why is a non-permanent, but long lasting, magnet  

NLE Websites -- All DOE Office Websites (Extended Search)

Which jobs use electromagnets? Which jobs use electromagnets? Previous Question (Which jobs use electromagnets?) Questions and Answers Main Index Next Question (Can you turn something into a magnet by banging on it in a specific way?) Can you turn something into a magnetby banging on it in a specific way? Why is a non-permanent, but long lasting, magnet called a permanent magnet? Permanent magnets are magnets that you don't have to use energy to make them magnetic. Some types of permanent magnets, relative to the length of lives of humans, are pretty close to permanent. They decay slowly, but they do decay. When most of the magnetic domains in a material align in one direction you can call that a magnet. It helps if you can imagine a magnet as being made up of a bunch of little magnets. Each one has tiny North and

109

Biointrusion test plan for the Permanent Isolation Surface Barrier Prototype  

SciTech Connect

This document provides a testing and monitoring plan for the biological component of the prototype barrier slated for construction at the Hanford Site. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system. It is designed to permanently isolate waste from the biosphere. The features of the barrier include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, covered with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype barrier over the next several years to evaluate barrier performance under extreme climatic conditions. Plants and animals will play a significant role in the hydrologic and water and wind erosion characteristics of the prototype barrier. Studies on the biological component of the prototype barrier will include work on the initial revegetation of the surface, continued monitoring of the developing plant community, rooting depth and dispersion in the context of biointrusion potential, the role of plants in the hydrology of the surface and toe regions of the barrier, the role of plants in stabilizing the surface against water and wind erosion, and the role of burrowing animals in the hydrology and water and wind erosion of the barrier.

Link, S.O.; Cadwell, L.L.; Brandt, C.A.; Downs, J.L.; Rossi, R.E.; Gee, G.W.

1994-04-01T23:59:59.000Z

110

Ferrite permanent magnet electrical machine and the application thereof within vehicle traction drives  

SciTech Connect

This patent describes, in combination, a land vehicle having axially aligned ground engaging tractive wheels, and a drivetrain carried by the vehicle for the propulsion thereof. The drivetrain comprises: (a) a substantially fixed DC power source including at least one chemical battery, (b) transmission means including selectable multiple gear ratios, an input shaft and a mechanical differential operative to transfer torque to the wheels, (c) a single-phase self-synchronous permanent magnet motor including, (i) an elongated central shaft, (ii) a generally u-shaped frame assembly adapted for mechanical grounding the shaft to a relatively stationary portion of the vehicle, the shaft being secured to the frame proximate each end thereof, (iii) a stator assembly secured to the shaft and characterized by a plurality of outwardly directed integrally formed salient poles and associated bifilar-wound induction coils, and (iv) a rotor assembly rotatably disposed on the shaft and substantially enclosing the stator assembly, the rotor assembly comprising a cylindrical shell defining an inner surface.

Gritter, D.J.; O'Neil, W.K.; Turner, D.

1987-03-17T23:59:59.000Z

111

Bypassing the learning curve in permanent seed implants using state-of-the-art technology  

SciTech Connect

Purpose: The aim of this study was to demonstrate, based on clinical postplan dose distributions, that technology can be used efficiently to eliminate the learning curve associated with permanent seed implant planning and delivery. Methods and Materials: Dose distributions evaluated 30 days after the implant of the initial 22 consecutive patients treated with permanent seed implants at two institutions were studied. Institution 1 (I1) consisted of a new team, whereas institution 2 (I2) had performed more than 740 preplanned implantations over a 9-year period before the study. Both teams had adopted similar integrated systems based on three-dimensional (3D) transrectal ultrasonography, intraoperative dosimetry, and an automated seed delivery and needle retraction system (FIRST, Nucletron). Procedure time and dose volume histogram parameters such as D90, V100, V150, V200, and others were collected in the operating room and at 30 days postplan. Results: The average target coverage from the intraoperative plan (V100) was 99.4% for I1 and 99.9% for I2. D90, V150, and V200 were 191.4 Gy (196.3 Gy), 75.3% (73.0%), and 37.5% (34.1%) for I1 (I2) respectively. None of these parameters shows a significant difference between institutions. The postplan D90 was 151.2 Gy for I1 and 167.3 Gy for I2, well above the 140 Gy from the Stock et al. analysis, taking into account differences at planning, results in a p value of 0.0676. The procedure time required on average 174.4 min for I1 and 89 min for I2. The time was found to decrease with the increasing number of patients. Conclusion: State-of-the-art technology enables a new brachytherapy team to obtain excellent postplan dose distributions, similar to those achieved by an experienced team with proven long-term clinical results. The cost for bypassing the usual dosimetry learning curve is time, with increasing team experience resulting in shorter treatment times.

Beaulieu, Luc [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada)]. E-mail: beaulieu@phy.ulaval.ca; Evans, Dee-Ann Radford [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Aubin, Sylviane [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Angyalfi, Steven [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Husain, Siraj [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Kay, Ian [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Martin, Andre-Guy [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Varfalvy, Nicolas [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Vigneault, Eric [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Dunscombe, Peter [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada)

2007-01-01T23:59:59.000Z

112

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

113

IEEE TRANSACTIONS ON MAGNETICS, VOL. 41, NO. 10, OCTOBER 2005 3823 Design of a Superhigh-Speed Cryogenic Permanent  

E-Print Network (OSTI)

magnet is centrally located inside the hollow shaft. The permanent magnet was inserted into the hollow shaft by heating the titanium shaft to 570 K and cooling the permanent magnet down to 77 K. B. Design-Speed Cryogenic Permanent Magnet Synchronous Motor Liping Zheng1, Thomas X. Wu1, Dipjyoti Acharya2, Kalpathy B

Wu, Thomas

114

Analysis and Design of a High Power Density Axial Flux Permanent Magnet Linear Synchronous Machine Used for Stirling System  

Science Journals Connector (OSTI)

a high power density axial flux permanent magnet linear synchronous machine and the stirling system will be introduced. This machine is a tubular axial flux permanent magnet machine. It comprises two parts: stator and mover. With the 2D finite-element ... Keywords: permanent magnet, stirling engine, linear motor

Ping Zheng; Xuhui Gan; Lin Li

2010-09-01T23:59:59.000Z

115

Study of the Advantages of Internal Permanent Magnet Drive Motor with Selectable Windings for Hybrid-Electric Vehicles  

SciTech Connect

This report describes research performed on the viability of changing the effectively active number of turns in the stator windings of an internal permanent magnet (IPM) electric motor to strengthen or weaken the magnetic fields in order to optimize the motor's performance at specific operating speeds and loads. Analytical and simulation studies have been complemented with research on switching mechanisms to accomplish the task. The simulation studies conducted examine the power and energy demands on a vehicle following a series of standard driving cycles and the impact on the efficiency and battery size of an electrically propelled vehicle when it uses an IPM motor with turn-switching capabilities. Both full driving cycle electric propulsion and propulsion limited starting from zero to a set speed have been investigated.

Otaduy, P.J.; Hsu, J.S.; Adams, D.J.

2007-11-30T23:59:59.000Z

116

SPEAR Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Interface 1113 N. Kurita J. Langton Vacuum TSP's 1120 J. Corbett A. Terebilo MATLAB Applications - Basics 1121 F. Rafael Booster Kicker Upgrade, Operation Manual 1121...

117

operations center  

National Nuclear Security Administration (NNSA)

1%2A en Operations Center http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismoperationscenter

...

118

Statement of Secretaries Salazar and Chu on the Permanent Plugging of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretaries Salazar and Chu on the Permanent Plugging Secretaries Salazar and Chu on the Permanent Plugging of Macondo well Statement of Secretaries Salazar and Chu on the Permanent Plugging of Macondo well September 19, 2010 - 12:00am Addthis WASHINGTON, DC - Secretary of the Interior Ken Salazar and Energy Secretary Steven Chu today issued the following statement regarding the permanent plugging of BP's Macondo well. "With the successful first intercept by the relief well and our confirmation through pressure tests that the cement plugs are secure, we can now declare BP's Macondo well effectively dead. At the direction of President Obama and under the leadership of National Incident Commander Thad Allen, we have worked tirelessly and relentlessly as a US Team to reach this point and to provide oversight and direction to the source

119

The overview and history of permanent magnet devices in accelerator technology  

SciTech Connect

This paper reviews the early history of accelerator development with a particular focus on the important discoveries that opened the door for the application of permanent-magnet materials to this area of science. Researchers began to use permanent-magnet materials in particle accelerators soon after the invention of the alternating gradient principle, that showed magnetic fields could be used to control the transverse envelope of charged-particle beams. Since that time, permanent-magnet materials have found wide application in the modern charged particle accelerator. The history of permanent-magnet use in accelerator physics and technology is outlined, general design considerations are presented, and material properties of concern for particle accelerator applications are discussed.

Kraus, R.H. Jr.

1993-10-01T23:59:59.000Z

120

Multipolar permanent-magnet synchronous generators intended for wind power plants  

Science Journals Connector (OSTI)

The analytical method of calculating two-dimensional magnetic fields in the active section of permanent-magnet synchronous electrical rotating machines, as applied to their use in the wind energy industry, has be...

L. K. Kovalev; K. L. Kovalev; Ye. Ye. Tulinova; N. S. Ivanov

2012-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Fabrication and Performance of Silicon-Embedded Permanent-Magnet Microgenerators  

E-Print Network (OSTI)

This paper focuses on the design, fabrication, and characterization of silicon-packaged permanent-magnet (PM) microgenerators. The use of silicon packaging favors fine control on shape and dimensions in batch fabrication ...

Herrault, Florian

122

Permanent-Magnet A.C. and D.C. Machines  

Science Journals Connector (OSTI)

Problems of large permanent-magnet machines have been approached by study of new methods of in-situ magnetisation. Results obtained from an experimental magnetiser are reported, with a view to their...

B. J. Chalmers; E. Spooner; A. M. Sitzia…

1989-01-01T23:59:59.000Z

123

Evaluation of the filler effects on fatique cracking and permanent deformation of asphalt concrete mixtures  

E-Print Network (OSTI)

The addition of hydrated lime to asphalt has shown to be beneficial with an improvement in the Theological properties of the binder, as well as resistance to permanent deformation (rutting) and fatigue cracking of asphalt concrete mixtures...

Izzo, Richard P

1997-01-01T23:59:59.000Z

124

Study of permanent deformation mechanism in asphalt mixes in relation to microcrack growth  

E-Print Network (OSTI)

Recent developments by Lytton et al. (1998) indicate phics. that the growth of micrographs in asphalt layers under repeated loading is also a cause for the accumulation of permanent deformation or rutting in pavements besides the plastic strain...

Bhairampally, Rajesh Kumar

1998-01-01T23:59:59.000Z

125

The Dissipation of Energy in Permanent Ocean Currents, with Some Relations between Salinities, Temperatures and Currents  

Science Journals Connector (OSTI)

6 April 1921 research-article The Dissipation of Energy in Permanent Ocean Currents, with Some Relations between Salinities, Temperatures and Currents R. O. Street The Royal Society is collaborating with JSTOR to digitize, preserve...

1921-01-01T23:59:59.000Z

126

Sensorless Speed Control of Permanent Magnet-Assisted Synchronous Reluctance Motor (PMa-SynRM)  

E-Print Network (OSTI)

An interesting alternative for today's high efficiency variable speed drives is the Permanent Magnet-Assisted Synchronous Reluctance Motor drive, which belongs to the family of brushless synchronous AC motor drives. Generally, the reluctance torque...

Chakali, Anil K.

2011-02-22T23:59:59.000Z

127

Dual Functional Polyelectrolyte Multilayer Coatings for Implants: Permanent Microbicidal Base with Controlled Release of Therapeutic Agents  

E-Print Network (OSTI)

Here we present a new bifunctional layer-by-layer (LbL) construct made by combining a permanent microbicidal polyelectrolyte multilayered (PEM) base film with a hydrolytically degradable PEM top film that offers controlled ...

Wong, Sze Yinn

128

Design and analysis of a permanent magnet generator for naval applications  

E-Print Network (OSTI)

This paper discusses the electrical and magnetic design and analysis of a permanent magnet generation module for naval applications. Numerous design issues are addressed and several issues are raised about the potential ...

Rucker, Jonathan E. (Jonathan Estill)

2005-01-01T23:59:59.000Z

129

EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Lolo Creek Permanent Weir Construction near town of 5: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho Summary DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis.

130

Permanent magnet generators for renewable energy devices with wide speed range and pulsating power delivery  

Science Journals Connector (OSTI)

This paper describes the design of a direct-drive permanent-magnet generator for use in a novel sea-wave electrical generator. The basic system is briefly described and the target specification derived from the device and the wave tank performance. The design for the brushless permanent-magnet generators is then developed using SPEED PC-BDC and verified using Finite Element Analysis (PC-FEA). A diode bridge model is also tested using Portunus system simulation.

David G. Dorrell

2009-01-01T23:59:59.000Z

131

Factors affecting the permanence of livestock projects undertaken by Heifer International-Mexico  

E-Print Network (OSTI)

FACTORS AFFECTING THE PERMANENCE OF LIVESTOCK PROJECTS UNDERTAKEN BY HEIFER INTERNATIONAL-MEXICO A Thesis by SERGIO ADRIAN ARISPE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE May 2003 Major Subject: Agricultural Education FACTORS AFFECTING THE PERMANENCE OF LIVESTOCK PROJECTS UNDERTAKEN BY HEIFER INTERNATIONAL-MEXICO A Thesis by SERGIO ADRIAN ARISPE Submitted to Texas A&M University...

Arispe, Sergio Adrian

2012-06-07T23:59:59.000Z

132

The effect of atmospheric pollutants on paper permanence: A literature review  

SciTech Connect

The literature on the influence of atmospheric pollutants on paper permanence shows that the absorption of sulfur dioxide by paper depends on many factors. There is limited work on the effect of nitrogen dioxide on paper permanence. No data exists on the effect of ozone. Work on mixtures of gases is scarce. There is almost no literature on the relationship between the amount of pollutant gas absorbed and the strength loss of paper.

Gurnagul, N.; Zou, X. (PAPRICAN, Pointe Claire, Quebec (Canada))

1994-07-01T23:59:59.000Z

133

Role: Senior Geotechnical Engineer (permanent staff) Location: Alford, Aberdeenshire  

E-Print Network (OSTI)

to the offshore Oil and Gas and Renewable Energy industries. S&G has significant experience and capability: Geophysical site and route surveys Geotechnical assessment, engineering and operations Offshore construction, installation and trenching Subsea inspection Offshore project management, coordination and quality control Data

Evans, Paul G.

134

Design operators  

E-Print Network (OSTI)

Design operators is a thesis that investigates the nature and characteristics of the design process by examining the interaction of computation with architectural design. The effects of the introduction of these media in ...

Dritsas, Stylianos, 1978-

2004-01-01T23:59:59.000Z

135

Business Operations  

Office of Energy Efficiency and Renewable Energy (EERE)

The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of...

136

Operating Costs  

Directives, Delegations, and Requirements

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

137

Direct control of air gap flux in permanent magnet machines  

DOE Patents (OSTI)

A method and apparatus for field weakening in PM machines uses field weakening coils (35, 44, 45, 71, 72) to produce flux in one or more stators (34, 49, 63, 64), including a flux which counters flux normally produced in air gaps between the stator(s) (34, 49, 63, 64) and the rotor (20, 21, 41, 61) which carries the PM poles. Several modes of operation are introduced depending on the magnitude and polarity of current in the field weakening coils (35, 44, 45, 71, 72). The invention is particularly useful for, but not limited to, the electric vehicle drives and PM generators.

Hsu, John S. (Oak Ridge, TN)

2000-01-01T23:59:59.000Z

138

Site Characterization Report ORGDP Diffusion Facilities Permanent Shutdown K-700 Power House and K-27 Switch Yard/Switch House  

SciTech Connect

The K-700 Power House area, initially built to supply power to the K-25 gaseous diffusion plant was shutdown and disassembled in the 1960s. This shutdown was initiated by TVA supplying economical power to the diffusion plant complex. As a result of world wide over production of enriched, reactor grade U{sup 235}, the K-27 switch yard and switch house area was placed in standby in 1985. Subsequently, as the future production requirements decreased, the cost of production increased and the separation technologies for other processes improved, the facility was permanently shutdown in December, 1987. This Site Characterization Report is a part of the FY-88 engineering Feasibility Study for placing ORGDP Gaseous Diffusion Process facilities in 'Permanent Shutdown'. It is sponsored by the Department of Energy through Virgil Lowery of Headquarters--Enrichment and through Don Cox of ORO--Enrichment Operations. The primary purpose of these building or site characterization reports is to document, quantify, and map the following potential problems: Asbestos; PCB containing fluids; Oils, coolants, and chemicals; and External contamination. With the documented quantification of the concerns (problems) the Engineering Feasibility Study will then proceed with examining the potential solutions. For this study, permanent shutdown is defined as the securing and/or conditioning of each facility to provide 20 years of safe service with minimal expenditures and, where feasible, also serving DOE's needs for long-term warehousing or other such low-risk use. The K-700 power house series of buildings were either masonry construction or a mix of masonry and wood. The power generating equipment was removed and sold as salvage in the mid 1960s but the buildings and auxiliary equipment were left intact. The nine ancillary buildings in the power house area use early in the Manhattan Project for special research projects, were left intact minus the original special equipment. During the late 1960s and 1970s, some of the abandoned buildings were used for offices, special projects, and storage. Some of the remaining electrical transformers contain PCBs in concentrations less than 500 ppm. Many of the steam and hot water pipes in the buildings are insulated with asbestos insulation, but none of the equipment or buildings have high counts of surface radioactive contamination. The general conditions of the buildings are from fair to poor. Many should be boarded-up to prevent personnel entry and in some cases demolitions would be the safer alternative.

Thomas R.J., Blanchard R.D.

1988-06-13T23:59:59.000Z

139

Radial-Gap Permanent Magnet Motor and Drive Research FY 2004  

SciTech Connect

The objective of this task was to study permanent magnet (PM) radial-gap traction drive systems that could meet the U.S. Department of Energy FreedomCAR Program's 2010 goals to expose weaknesses or identify strengths. Initially, the approach was to compare attributes such as physical deformations during operation, performance (torque, power, efficiency versus speed), material requirements (strength), material costs, manufacturability, weight, power density, specific power, reliability, and drivability for specific motors. Three motors selected were the commercially available 60-kW radial-gap surface-mounted PM motor manufactured by UQM Technologies, Inc.; a hypothetical PM motor with rotor-supported magnets similar to the Honda MCF-21; and Delphi's automotive electric machine drive motor, whose rotor is a ferromagnetic cylinder, held at one end by a shaft that supports the magnets on its inner surface. Potential problems have appeared related to PM motors, such as (1) high no-load spin losses and high operational power losses, probably from eddy current losses in the rotor; (2) the undemonstrated dual mode inverter control (DMIC) for driving a brushless dc motor (BDCM) (UQM and Delphi motors); (3) uncertainty about the potential for reducing current with DMIC; and (4) uncertainty about the relation between material requirements and maximum rotor speed. Therefore, the approach was changed to study in detail three of the comparison attributes: drivability, performance, and material requirements. Drivability and related problems were examined by demonstrating that DMIC may be used to drive an 18-pole 30-kW PM motor to 6000 rpm, where the maximum electrical frequency is 900 Hz. An available axial-gap test motor with 18 poles was used because its control is identical to that of a radial gap PM motor. Performance was analytically examined, which led to a derivation showing that DMIC controls a PM motor so that the motor uses minimum current to produce any power regardless of speed for relative speeds, n = {omega}/{omega}{sub base} {ge} 2. Performance was also examined with efficiency measurements during the 30-kW PM motor test. Material requirements were examined with finite-element analyses (FEA) to determine the speed and location where yield starts and the corresponding deformations and stresses.

McKeever, J.W.

2005-02-11T23:59:59.000Z

140

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

142

GRR/Section 3-TX-d - Lease of Permanent School Fund Land | Open Energy  

Open Energy Info (EERE)

3-TX-d - Lease of Permanent School Fund Land 3-TX-d - Lease of Permanent School Fund Land < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-TX-d - Lease of Permanent School Fund Land 03-TX-d - Lease of Public School Fund Land (1).pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 03-TX-d - Lease of Public School Fund Land (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the process of leasing Public School Fund (PSF) lands in Texas. The Texas General Land Office (GLO) oversees the leasing process for PSF lands through Title 31 of the Texas Administrative Code

143

Rotational and magnetic shunt permanent magnet quadrupoles with variable magnetic strength  

SciTech Connect

Next Linear Collider (NLC) and Very Large Hadron Collider (VLHC) projects suppose to use permanent magnets as bending, focusing and correcting elements. Prototypes of two permanent magnet quadrupoles with variable strength were built and successfully tested in Fermilab. Quadrupoles have 12.7 mm aperture diameter, 100 T/m gradient with an adjustment range of 0 to -20%. Special designs provide high precision magnetic center stability during strength change. SmCo5 permanent magnet bricks were used in these prototypes. Rotational quadrupole consists of four sections. Two central sections are rotated in counter directions to adjust the strength. Magnetic shunt quadrupole design provides variable shunting of the magnetic flux. The numerical simulation, designs, measuring results are described.

Vladimir Kashikhin et al.

2002-03-28T23:59:59.000Z

144

Substation Operation  

Science Journals Connector (OSTI)

... THIS book is intended to help the workman to understand the principles of substation operation. It is a good attempt at giving somewhat advanced technical knowledge in such ... ." We are told not to use water to put out a fire at a substation before the station has been made completely " dead." The reason given for this ...

1925-08-01T23:59:59.000Z

145

Enhanced production of ECR plasma by using pulse mode microwaves on a large bore ECRIS with permanent magnets  

SciTech Connect

In order to enhance the efficiency of an electron cyclotron resonance (ECR) plasma for a broad and dense ion beam source at low pressure, the magnetic field configuration is constructed by all permanent magnets. By using the pulse mode, we aim at the generation of plasma with parameters that cannot be achieved in the CW mode at microwave frequencies of 11-13GHz, under the constraint of the same average incident microwave powers. It is found that the total beam currents are increased by the pulse mode operation compared with the case of the CW mode. According to probe measurements of the ECR plasma, it is found that the electron density in the pulse mode is larger than that in the CW mode, while the electron temperatures in the pulse mode are lower than that in the CW mode. These results are discussed from the viewpoint of relaxation times obtained on plasma parameters and ECR efficiency. The cause of the beam current increment and operational windows spread due to the pulse mode are also discussed on these parameters suitable to production of molecular/cluster ions.

Kato, Yushi; Kiriyama, Ryutaro; Takenaka, Tomoya; Kurisu, Yosuke; Nozaki, Dai; Yano, Keisuke; Sato, Fuminobu; Iida, Toshiyuki [Division of Electrical, Electronic and Information Engineering, Graduate School of Engineering, Osaka Univ., 2-1 Ymadaoka, Suita-shi, Osaka, 565-0871 (Japan)

2012-11-06T23:59:59.000Z

146

Intracollisional interference in the pure rotational spectrum of HD: Determination of the permanent electric dipole moment  

Science Journals Connector (OSTI)

The intensity of the pure rotational absorption spectrum of gaseous HD is measured as a function of density for pure HD and HD-He and HD-Ar mixtures. The decrease in the absorption coefficient with increasing density is consistent with a destructive intracollisional interference between the transitions involving the permanent and collision-induced dipole moments. The permanent dipole moment of the molecule in its ground vibrational state is found to be J dependent and in the range (8-10)×10-4 D.

J. Bradley Nelson and G. C. Tabisz

1983-10-01T23:59:59.000Z

147

Operation Poorman  

SciTech Connect

The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

Pruvost, N.; Tsitouras, J.

1981-03-18T23:59:59.000Z

148

IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, VOL. 55, NO. 2, FEBRUARY 2008 501 Permanent Magnet Synchronous Machine  

E-Print Network (OSTI)

IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, VOL. 55, NO. 2, FEBRUARY 2008 501 Permanent Magnet. The proposed hybrid control scheme is applied to an electrical motor drive composed of an inverter coupled to a perma- nent magnet synchronous machine. An evolution which insures a fixed modulation frequency is also

Paris-Sud XI, Université de

149

Permanence Discounting for Land-Based Carbon Sequestration Man-Keun Kim  

E-Print Network (OSTI)

Permanence Discounting for Land-Based Carbon Sequestration By Man-Keun Kim Post Doctoral Fellow Discounting for Land-Based Carbon Sequestration 1. Introduction Land-based soil carbon sequestration has been explored the potential of land-based carbon sequestration strategies in the US such as afforestation

McCarl, Bruce A.

150

FEL performance with pure permanent-magnet undulators having optimized ordering  

Science Journals Connector (OSTI)

The degradation of FEL performance by field errors can be greatly mitigated in a pure permanent-magnet undulator by appropriate ordering of magnets. Monte Carlo techniques have been used to obtain such optimized ordering for various systems. The resulting performance improvement has been evaluated using the Rocketdyne simulation code FELOPT.

R.A. Cover; B.L. Bobbs; G. Rakowsky; M.M. Johnson; S.P. Mills

1990-01-01T23:59:59.000Z

151

Permanent shadow in simple craters near the lunar poles D. Ben J. Bussey,1  

E-Print Network (OSTI)

Planetology: Solid Surface Planets: Remote sensing; 6250 Planetology: Solar System Objects: Moon (1221, such as the floors of impact craters, may be in permanent shadow, whilst high areas may receive near constant solar) that any water molecule in a polar cold trap will not have the thermal energy to escape [Watson et al

Spudis, Paul D.

152

Multi-criteria based design approach of multiphase permanent magnet low speed synchronous machines  

E-Print Network (OSTI)

Multi-criteria based design approach of multiphase permanent magnet low speed synchronous machines'Ecole Navale Letellier, Paul; Groupe Altawest, Jeumont Electric Keyword: AC MACHINES, BRUSHLESS MACHINES low speed synchronous machines April 21, 2008 Abstract This paper presents a design methodology

Paris-Sud XI, Université de

153

Author's personal copy Mapping and characterization of non-polar permanent shadows on the lunar surface  

E-Print Network (OSTI)

as close to the equator as ±58° of latitude. These results were obtained through application of a ray. Each permanent shadow on the equator side of ±65° of latitude is shown in detail. Surface brightness Mapping Spectrometer (VIMS), the Deep Impact High-Resolution Instru- ment-IR spectrometer (HRI

Spudis, Paul D.

154

AN ISSUE OF PERMANENCE: ASSESSING THE EFFECTIVENESS OF TEMPORARY CARBON STORAGE  

E-Print Network (OSTI)

with a `leaky' carbon sequestration reservoir, we argue that this is an issue that applies to just about all that the value of relatively deep ocean carbon sequestration can be nearly equivalent to permanent sequestration gases using carbon sequestration technologies (Herzog et al., 2000; Herzog, 2001) is being proposed

155

Permanent Bubble Arrays from a Cross-Linked Poly(para-phenyleneethynylene): Picoliter Holes without Microfabrication  

E-Print Network (OSTI)

Permanent Bubble Arrays from a Cross-Linked Poly(para-phenyleneethynylene): Picoliter Holes without). The holes are formed by heating self-assembled bubble arrays (from 4) to 300 °C. They will be useful evaporating solvents generate hexagonally ordered bubble arrays when moist air is used to evaporate

Srinivasarao, Mohan

156

Mercury, Methylmercury, and Other Constituents in Sediment and Water from Seasonal and Permanent  

E-Print Network (OSTI)

Wetlands in the Cache Creek Settling Basin and Yolo Bypass, Yolo County, California, 2005-06 Open File Creek Settling Basin and Yolo Bypass, Yolo County, California, 2005-06 By Mark Marvin and permanent wetlands in the Cache Creek Settling Basin and Yolo Bypass, Yolo County, California, 2005-06: U

157

Bulk SmCo5/a-Fe nanocomposite permanent magnets fabricated by mould-free Joule-heating compaction  

E-Print Network (OSTI)

Bulk SmCo5/a-Fe nanocomposite permanent magnets fabricated by mould-free Joule-heating compaction and soft magnetic phases.1­3 The prerequisite for effective exchange coupling is a small grain size, which are used to produce single-phase microcrystalline permanent magnets, are ineffective in producing

Liu, J. Ping

158

296 IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, VOL. 57, NO. 1, JANUARY 2010 Very-High-Speed Slotless Permanent-Magnet  

E-Print Network (OSTI)

cell compressor [9]), machining industry (machine tool [10], micromachining), home appliance industry-High-Speed Slotless Permanent-Magnet Motors: Analytical Modeling, Optimization, Design, and Torque Measurement Methods-high-speed (VHS) slotless permanent-magnet motor design procedure using an analytical model. The model is used

Psaltis, Demetri

159

Power-Factor and Torque Calculation with Consideration of Cross Saturation of the Interior Permanent Magnet Synchronous Motor with  

E-Print Network (OSTI)

motor of a hybrid electric vehicle. I. INTRODUCTION The interior permanent magnet synchronous motor for application in a hybrid electric vehicle. The BFE structure enables the motor to control the magnitude Permanent Magnet Synchronous Motor with Brushless Field Excitation Seong Taek Lee1,2 , Timothy A. Burress1

Tolbert, Leon M.

160

Axial Flux, Modular, Permanent-Magnet Generator with a Toroidal Winding for Wind Turbine Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

CP-500-24996 Ÿ UC Category: 1213 CP-500-24996 Ÿ UC Category: 1213 Axial Flux, Modular, Permanent- Magnet Generator with a Toroidal Winding for Wind Turbine Applications E. Muljadi C.P. Butterfield Yih-Huei Wan National Wind Technology Center National Renewable Energy Laboratory Presented at IEEE Industry Applications Conference St. Louis, MO November 5-8, 1998 National Renewable Energy Laboratory 1617 Cole Boulevard

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Minimizing Wheel Slip in Railway Locomotives with Coupled Permanent Magnet Synchronous Motors  

E-Print Network (OSTI)

In this work I consider control strategies of permanent magnet synchronous motors in which the back-emf signal from the motor is used to achieve commutation of the six step driving circuit. I show that if the strategy is modified to connect multiple motors in a cyclic chain, then a collective synchronized state is favoured. The stability of this state can be exploited in the bogies of a railway locomotive to automatically terminate wheel slipping episodes.

Shayak Bhattacharjee

2015-01-17T23:59:59.000Z

162

Minimizing Wheel Slip in Railway Locomotives with Coupled Permanent Magnet Synchronous Motors  

E-Print Network (OSTI)

In this work I consider control strategies of permanent magnet synchronous motors in which the back-emf signal from the motor is used to achieve commutation of the six step driving circuit. I show that if the strategy is modified to connect multiple motors in a cyclic chain, then a collective synchronized state is favoured. The stability of this state can be exploited in the bogies of a railway locomotive to automatically terminate wheel slipping episodes.

Shayak Bhattacharjee

2014-10-12T23:59:59.000Z

163

Dynamic high pressure process for fabricating superconducting and permanent magnetic materials  

DOE Patents (OSTI)

Shock wave formation of thin layers of materials with improved superconducting and permanent magnetic properties and improved microstructures is disclosed. The material fabrication system includes a sandwiched structure including a powder material placed between two solid members to enable explosive shock consolidation. The two solid members are precooled to about 80--100 K to reduce the residual temperatures attained as a result of the shock wave treatment, and thereby increase the quench rate of the consolidated powder. 9 figs.

Nellis, W.J.; Geballe, T.H.; Maple, M.B.

1990-03-13T23:59:59.000Z

164

Energy Saving Melting and Revert Reduction Technology (Energy-SMARRT): Light Metals Permanent Mold Casting  

SciTech Connect

Current vehicles use mostly ferrous components for structural applications. It is possible to reduce the weight of the vehicle by substituting these parts with those made from light metals such as aluminum and magnesium. Many alloys and manufacturing processes can be used to produce these light metal components and casting is known to be most economical. One of the high integrity casting processes is permanent mold casting which is the focus of this research report. Many aluminum alloy castings used in automotive applications are produced by the sand casting process. Also, aluminum-silicon (Al-Si) alloys are the most widely used alloy systems for automotive applications. It is possible that by using high strength aluminum alloys based on an aluminum-copper (Al-Cu) system and permanent mold casting, the performance of these components can be enhanced significantly. This will also help to further reduce the weight. However, many technological obstacles need to be overcome before using these alloys in automotive applications in an economical way. There is very limited information in the open literature on gravity and low-pressure permanent mold casting of high strength aluminum alloys. This report summarizes the results and issues encountered during the casting trials of high strength aluminum alloy 206.0 (Al-Cu alloy) and moderate strength alloy 535.0 (Al-Mg alloy). Five engineering components were cast by gravity tilt-pour or low pressure permanent mold casting processes at CanmetMATERIALS (CMAT) and two production foundries. The results of the casting trials show that high integrity engineering components can be produced successfully from both alloys if specific processing parameters are used. It was shown that a combination of melt processing and mold temperature is necessary for the elimination of hot tears in both alloys.

Fasoyinu, Yemi [CanmetMATERIALS] [CanmetMATERIALS

2014-03-31T23:59:59.000Z

165

The use of a permanent magnet for water content measurements ofwood chips  

SciTech Connect

The Lawrence Berkeley National Laboratory has developed a device that measures the water content of wood chips, pulp and brown stock for the paper industry. This device employs a permanent magnet as the central part of a NMR measurement system. This report describes the magnet and the NMR measurement system. The results of water content measurements in wood chips in a magnetic field of 0.47 T are presented.

Barale, P.J.; Fong, C.G.; Green, M.A.; Luft, P.A.; McInturff,A.D.; Reimer, J.A.; Yahnke, M.

2001-09-20T23:59:59.000Z

166

First operation of the Rocketdyne/Stanford free electron laser  

Science Journals Connector (OSTI)

A near infrared free electron laser (FEL) has been built and installed by Rocketdyne in the Stanford Photon Research Laboratory. The Rocketdyne/Stanford FEL utilizes a very high quality, 2 m long, permanent magnet planar wiggler whose gap may be continuously tuned, and magnetic field axially tapered by varying the gap at one end relative to the other. The laser is operated with an e-beam supplied by the Stanford Mark-III accelerator. A stable resonator with a broadband, dielectric coated element permits transmissive outcoupling over the 2.7–3.7 ?m wavelength range. Results from initial operation of this laser are presented.

Anup Bhowmik; Mark S. Curtin; Wayne A. McMullin; Stephen V. Benson; John M.J. Madey; Bruce A. Richman; Louis Vintro

1988-01-01T23:59:59.000Z

167

Design of a high power density, permanent magnet, axial gap dc motor  

SciTech Connect

In the design of drive motors for undersea vehicles, the premium placed on noise suppression suggests the use of a brush-commutated dc motor. The additional constraints of weight and volume, as well as unusual configuration, presents the axial air-gap configuration, with a permanent magnet field, as a viable candidate. In such a configuration the design of the brushes and commutator and the resulting structure becomes critical. The report describes a novel solution to this problem. The basic motor consists of two discs containing permanent magnets on either side of a magnetic structure containing the copper windings. An advantage of this motor concept is that copper cooling may easily be accomplished through the use of liquid circulating through the stator windings. The role of field and armature in a conventional disc motor configuration are reversed. The two discs containing the permanent magnets are rotating. The brushes are on the discs. The magnetic structure with the coils is stationary. The commutator bars are imbedded in the stationary member. Input power is supplied to the brushes through a brush-and-slip ring assembly. An electromagnetic design analysis for a 92 ft-lb, 700 rpm motor was performed. A finite element analysis has been conducted and the results show that magnetic saturation is not a limiting factor in this design. The motor torque is achievable within weight and volume constraints. 9 figs., 1 tab.

Hawsey, R.A.; Daniel, D.S.; Thomas, R.J. (Oak Ridge National Lab., TN (USA)); Bailey, J.M. (Tennessee Univ., Knoxville, TN (USA))

1990-01-01T23:59:59.000Z

168

arXiv:1103.2923v1[math.OC]15Mar2011 Estimation of Saturation of Permanent-Magnet  

E-Print Network (OSTI)

effects such as cross-coupling and permanent magnet demagnetization can introduce large errorsarXiv:1103.2923v1[math.OC]15Mar2011 Estimation of Saturation of Permanent-Magnet Synchronous Motors a parametric model of the saturated Permanent-Magnet Synchronous Motor (PMSM) together with an estimation

Paris-Sud XI, Université de

169

arXiv:cond-mat/0007297v118Jul2000 Permanent magnetic moment in mesoscopic metals with spin-orbit interaction  

E-Print Network (OSTI)

arXiv:cond-mat/0007297v118Jul2000 Permanent magnetic moment in mesoscopic metals with spin-orbit interaction and odd number of electrons will have a permanent magnetic moment, even in zero magnetic field an effective single-electron Hamiltonian which accounts for spin-orbit coupling. I. INTRODUCTION Permanent

Serota, Rostislav

170

C:\\Users\\jorgan\\Documents\\Web Edits\\Vacancies\\Pastry Chef\\Template -Application for Permanent Employment (3).doc BRASENOSE COLLEGE  

E-Print Network (OSTI)

C:\\Users\\jorgan\\Documents\\Web Edits\\Vacancies\\Pastry Chef\\Template - Application for Permanent: #12;C:\\Users\\jorgan\\Documents\\Web Edits\\Vacancies\\Pastry Chef\\Template - Application for Permanent:\\Users\\jorgan\\Documents\\Web Edits\\Vacancies\\Pastry Chef\\Template - Application for Permanent Employment (3).doc Employment History

Oxford, University of

171

Modeling, analysis and comparison of TSR and OTC methods for MPPT and power smoothing in permanent magnet synchronous generator-based wind turbines  

Science Journals Connector (OSTI)

Abstract This paper presents a small signal modeling of a direct-driven permanent magnet synchronous generator (PMSG) based on wind turbine which is connected to the grid via back-to-back converters. The proposed small signal model includes two maximum power point tracking (MPPT) controllers: tip speed ratio (TSR) control and optimal torque control (OTC). These methods are analytically compared to illustrate MPPT and power smoothing capability. Then, to compare the MPPT and power smoothing operation of the mentioned methods, simulations are performed in MATLAB/Simulink software. From the simulation results, OTC is highly efficient in power smoothing enhancement and has clearly good performance to extract maximum power from wind; however, TSR control has definitely fast responses to wind speed variations with the expense of higher fluctuations due to its non-minimum phase characteristic.

M. Nasiri; J. Milimonfared; S.H. Fathi

2014-01-01T23:59:59.000Z

172

Remedial neural network inverse control of a multi-phase fault-tolerant permanent-magnet motor drive for electric vehicles  

Science Journals Connector (OSTI)

A five-phase in-wheel fault-tolerant interior permanent-magnet (FT-IPM) motor incorporates the merits of high efficiency, high power density and high reliability, suitable for Electric Vehicles (EVs). A new remedial Neural Networks Inverse (NNI) control strategy is proposed to attain the post-fault operation. In this scheme, the NN is used to approximate the inverse model of the FT-IPM motor. With this NNI system and the original motor drive combined, a pseudo-linear compound system can be obtained. The simulation demonstrates that the proposed control strategy leads to excellent control performance at the faulty mode and offers good robustness against load disturbance.

Duo Zhang; Guohai Liu; Wenxiang Zhao

2013-01-01T23:59:59.000Z

173

An improved efficiency of fuzzy sliding mode control of permanent magnet synchronous motor for wind turbine generator pumping system  

Science Journals Connector (OSTI)

This paper presents an analysis by which the dynamic performances of a permanent magnet synchronous motor (PMSM) motor is controlled through a hysteresis current loop and an outer speed loop with different contro...

F. Benchabane; A. Titaouine; O. Bennis; A. Guettaf; K. Yahia…

2012-04-01T23:59:59.000Z

174

Recovery Act: Carbon Dioxide-Water Emulsion for Enhanced Oil Recovery and Permanent Sequestration of Carbon Dioxid  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Dioxide-Water Carbon Dioxide-Water Emulsion for Enhanced Oil Recovery and Permanent Sequestration of Carbon Dioxide Background The U.S. Department of Energy (DOE) distributed a portion of American Recovery and Reinvestment Act (ARRA) funds to advance technologies for chemical conversion of carbon dioxide (CO 2 ) captured from industrial sources. The focus of the research projects is permanent sequestration of CO 2 through mineralization or development

175

Formal Specification of Operating System Operations  

E-Print Network (OSTI)

Formal Specification of Operating System Operations Dan Zhou Department of Computer Science.black@nist.gov This paper describes the development of a formal specification for a secure operating system architecture operations. We also provide a uniform environment for system commands that change the security state

Black, Paul E.

176

(sanitary) landfill operator  

Science Journals Connector (OSTI)

(sanitary) landfill operator, Müllkippenbetreiber m, Mülldeponiebetreiber, Kippenbetreiber, Deponiebetreiber

2014-08-01T23:59:59.000Z

177

Determination of prescription dose for Cs-131 permanent implants using the BED formalism including resensitization correction  

SciTech Connect

Purpose: The current widely used biological equivalent dose (BED) formalism for permanent implants is based on the linear-quadratic model that includes cell repair and repopulation but not resensitization (redistribution and reoxygenation). The authors propose a BED formalism that includes all the four biological effects (4Rs), and the authors propose how it can be used to calculate appropriate prescription doses for permanent implants with Cs-131. Methods: A resensitization correction was added to the BED calculation for permanent implants to account for 4Rs. Using the same BED, the prescription doses with Au-198, I-125, and Pd-103 were converted to the isoeffective Cs-131 prescription doses. The conversion factor F, ratio of the Cs-131 dose to the equivalent dose with the other reference isotope (F{sub r}: with resensitization, F{sub n}: without resensitization), was thus derived and used for actual prescription. Different values of biological parameters such as ?, ?, and relative biological effectiveness for different types of tumors were used for the calculation. Results: Prescription doses with I-125, Pd-103, and Au-198 ranging from 10 to 160 Gy were converted into prescription doses with Cs-131. The difference in dose conversion factors with (F{sub r}) and without (F{sub n}) resensitization was significant but varied with different isotopes and different types of tumors. The conversion factors also varied with different doses. For I-125, the average values of F{sub r}/F{sub n} were 0.51/0.46, for fast growing tumors, and 0.88/0.77 for slow growing tumors. For Pd-103, the average values of F{sub r}/F{sub n} were 1.25/1.15 for fast growing tumors, and 1.28/1.22 for slow growing tumors. For Au-198, the average values of F{sub r}/F{sub n} were 1.08/1.25 for fast growing tumors, and 1.00/1.06 for slow growing tumors. Using the biological parameters for the HeLa/C4-I cells, the averaged value of F{sub r} was 1.07/1.11 (rounded to 1.1), and the averaged value of F{sub n} was 1.75/1.18. F{sub r} of 1.1 has been applied to gynecological cancer implants with expected acute reactions and outcomes as expected based on extensive experience with permanent implants. The calculation also gave the average Cs-131 dose of 126 Gy converted from the I-125 dose of 144 Gy for prostate implants. Conclusions: Inclusion of an allowance for resensitization led to significant dose corrections for Cs-131 permanent implants, and should be applied to prescription dose calculation. The adjustment of the Cs-131 prescription doses with resensitization correction for gynecological permanent implants was consistent with clinical experience and observations. However, the Cs-131 prescription doses converted from other implant doses can be further adjusted based on new experimental results, clinical observations, and clinical outcomes.

Luo, Wei, E-mail: wei.luo@uky.edu; Molloy, Janelle; Aryal, Prakash; Feddock, Jonathan; Randall, Marcus [Department of Radiation Medicine, University of Kentucky, Lexington, Kentucky 40536 (United States)] [Department of Radiation Medicine, University of Kentucky, Lexington, Kentucky 40536 (United States)

2014-02-15T23:59:59.000Z

178

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

179

Hermitian Young operators  

SciTech Connect

Starting from conventional Young operators, we construct Hermitian operators which project orthogonally onto irreducible representations of the (special) unitary group.

Keppeler, Stefan, E-mail: stefan.keppeler@uni-tuebingen.de [Mathematisches Institut, Universität Tübingen, Auf der Morgenstelle 10, 72076 Tübingen (Germany)] [Mathematisches Institut, Universität Tübingen, Auf der Morgenstelle 10, 72076 Tübingen (Germany); Sjödahl, Malin, E-mail: malin.sjodahl@thep.lu.se [Department of Astronomy and Theoretical Physics, Lund University, Sölvegatan 14A, 223 62 Lund (Sweden)] [Department of Astronomy and Theoretical Physics, Lund University, Sölvegatan 14A, 223 62 Lund (Sweden)

2014-02-15T23:59:59.000Z

180

Permanent Magnet Skew Quadrupoles for the Low Emittance LER Lattice of PEP-II  

SciTech Connect

The vertical emittance of the low energy ring (LER) in the PEP-II B-Factory was reduced by using skew quadrupoles consisting of permanent magnet material. The advantages over electric quadrupoles or rotating existing normal quadrupoles are discussed. To assure a high field quality, a Biot-Savart calculation was used to cancel the natural 12-pole component by using different size poles over a few layers. A magnetic measurement confirmed the high quality of the magnets. After installation and adjusting the original electric 12 skew and 16 normal quadrupoles the emittance contribution from the region close to the interaction point, which was the biggest part in the original design, was considerably reduced. To strengthen the vertical behavior of the LER beam, a low emittance lattice was developed. It lowered the original vertical design emittance from 0.54 nm-rad to 0.034 nm-rad. In order to achieve this, additional skew quadrupoles were required to bring the coupling correction out of the arcs and closer to the detector solenoid in the straight (Fig. 1). It is important, together with low vertical dispersion, that the low vertical emittance is not coupled into the horizontal, which is what we get if the coupling correction continues into the arcs. Further details of the lattice work is described in another paper; here we concentrate on the development of the permanent skew (PSK) quadrupole solution. Besides the permanent magnets there are two other possibilities, using electric magnets or rotating normal quadrupoles. Electric magnets would have required much more additional equipment like magnets stands, power supply, and new vacuum chamber sections. Rotating existing quadrupoles was also not feasible since they are mostly mounted together with a bending magnet on the same support girder.

Decker, F.-J.; Anderson, S.; Kharakh, D.; Sullivan, M.; /SLAC

2011-07-05T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis.

182

A Machine Approach for Field Weakening of Permanent-Magnet Motors  

SciTech Connect

The commonly known technology of field weakening for permanent-magnet (PM) motors is achieved by controlling the direct-axis current component through an inverter, without using mechanical variation of the air gap, a new machine approach for field weakening of PM machines by direct control of air-gap fluxes is introduced. The demagnetization situation due to field weakening is not an issue with this new method. In fact, the PMs are strengthened at field weakening. The field-weakening ratio can reach 1O:1 or higher. This technology is particularly useful for the PM generators and electric vehicle drives.

Hsu, J.S.

2000-04-02T23:59:59.000Z

183

Cerium-Based Magnets: Novel High Energy Permanent Magnet Without Critical Elements  

SciTech Connect

REACT Project: Ames Laboratory will develop a new class of permanent magnets based on the more commonly available element cerium for use in both EVs and renewable power generators. Cerium is 4 times more abundant and significantly less expensive than the rare earth element neodymium, which is frequently used in today’s most powerful magnets. Ames Laboratory will combine other metal elements with cerium to create a new magnet that can remain stable at the high temperatures typically found in electric motors. This new magnetic material will ultimately be demonstrated in a prototype electric motor, representing a cost-effective and efficient alternative to neodymium-based motors.

None

2012-01-01T23:59:59.000Z

184

Modular axial-flux permanent-magnet motor for ship propulsion drives  

SciTech Connect

Original features such as compactness and lightness make slotless axial-flux permanent-magnet machines (AFPMs) eligible for application in large power motor drives devoted to the direct drive of ship propellers. This paper discusses characteristics of AFPMs designed for application in marine propulsion, and machine performances such as efficiency, weight and torque density are evaluated for a comparison with those of conventional synchronous machines. A newly-conceived modular arrangement of the machine stator winding is proposed and experimental results taken from a small-size machine prototype are finally shown.

Caricchi, F.; Crescimbini, F.; Honorati, O.

1999-09-01T23:59:59.000Z

185

Direct thrust measurement of a permanent magnet helicon double layer thruster  

SciTech Connect

Direct thrust measurements of a permanent magnet helicon double layer thruster have been made using a pendulum thrust balance and a high sensitivity laser displacement sensor. At the low pressures used (0.08 Pa) an ion beam is detected downstream of the thruster exit, and a maximum thrust force of about 3 mN is measured for argon with an rf input power of about 700 W. The measured thrust is proportional to the upstream plasma density and is in good agreement with the theoretical thrust based on the maximum upstream electron pressure.

Takahashi, K.; Lafleur, T.; Charles, C.; Alexander, P.; Boswell, R. W. [Space Plasma, Power and Propulsion Group, Research School of Physics and Engineering, Australian National University, Canberra ACT 0200 (Australia); Perren, M.; Laine, R. [ASTRIUM-EADS, 6 rue Laurent Pichat, 75016 Paris (France); Pottinger, S.; Lappas, V.; Harle, T.; Lamprou, D. [Surrey Space Centre, University of Surrey, Guildford GU2 7XH (United Kingdom)

2011-04-04T23:59:59.000Z

186

Toward a permanent lunar settlement in the coming decade: the Columbus Project  

SciTech Connect

The motivation for creating a permanent lunar settlement is sketched, and reasons for doing so in the coming decade are put forward. A basic plan to accomplish this is outlined, along technical and programmatic axes. It is concluded that founding a lunar settlement on the five hundredth anniversary of the Columbus landing - a Columbus Project - could be executed as a volunteer-intensive American enterprise requiring roughly six thousand man-years of skilled endeavor and a total Governmental contribution of the order of a half-billion dollars. 8 figs.

Hyde, R.A.; Ishikawa, M.Y.; Wood, L.L.

1985-11-19T23:59:59.000Z

187

Status of UCLA Helical Permanent-Magnet Inverse Free Electron Laser  

SciTech Connect

A helical undulator, utilizing permanent-magnet of cylindrically symmetric (Halbach) geometry is being developed at UCLA's Neptune Facility. The initial prototype is a short 10 cm, 7 periods long helical undulator, designed to test the electron-photon coupling by observing the micro-bunching is currently being constructed. The Neptune IFEL facility utilizes a 15 MeV Photoinjector-generated electron beam of 0.5 nC interacting with CO{sub 2} of peak energy up to 100 J, estimated to have acceleration of 100 MeV/m. An Open Iris-Loaded Waveguide Structure (OILS) scheme which conserves laser mode size and wave fronts throughout the undulator, is utilized to avoid Gouy phase shift caused by focusing of the drive laser. Undulator design was tested by computer simulations Radia and Genesis 1.3. Coherent Transition Radiation and Coherent Cherenkov Radiation will be used for micro-bunching diagnostic. Currently permanent dipoles and their aluminum holders have been built, and the project is in its final state of assembly and undulator testing.

Knyazik, A.; Tikhoplav, R.; Frederico, J. T.; Affolter, M.; Rosenzweig, J. B. [Department of Physics and Astronomy, UCLA, Los Angeles, California 90095 (United States)

2009-01-22T23:59:59.000Z

188

Temperature and thermal stress distributions for the HFIR permanent reflector generated by nuclear heating  

SciTech Connect

The beryllium permanent reflector of the High Flux Isotope Reactor has the main functions for slowing down and reflecting the neutrons and housing the experimental facilities. The reflector is heated as a result of the nuclear reaction. Heat is removed mainly by the cooling water passing through the densely distributed coolant holes along the vertical or axial direction of the reflector. The reflector neutronic distribution and its heating rate are calculated by J.C. Gehin of the Oak Ridge National Laboratory by applying the Monte Carlo Code MCNP. The heat transfer boundary conditions along several reflector interfaces are estimated to remove additional heat from the reflector. The present paper is to report the calculation results of the temperature and the thermal stress distributions of the permanent reflector by applying the computer aided design code I-DEAS and the finite element code ABAQUS. The present calculation is to estimate the high stress areas as a result of the new beam tube cutouts along the horizontal mid-plane of the reflector of the recent reactor upgrade project. These high stresses were not able to be calculated in the preliminary design analysis in earlier 60`s. The heat transfer boundary conditions are used in this redesigned calculation. The material constants and the acceptance criteria for the allowable stresses are mainly based on that assumed in the preliminary design report.

Chang, S.J.

1998-04-01T23:59:59.000Z

189

JLF Conduct of Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Jupiter Laser Facility (JLF) Conduct Of Operations The Conduct of Operations is a set of procedures and guidelines that are put in place to ensure operational safety and security...

190

Heat Transfer Operators Associated with Quantum Operations  

E-Print Network (OSTI)

Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

Ç. Aksak; S. Turgut

2011-04-14T23:59:59.000Z

191

Theory of dissociative recombination of a linear triatomic ion with permanent electric dipole moment: Study of HCO{sup +}  

SciTech Connect

We present a theoretical description of dissociative recombination of triatomic molecular ions having large permanent dipole moments. The study has been partly motivated by a discrepancy between experimental and theoretical cross sections for dissociative recombination of the HCO{sup +} ion. The HCO{sup +} ion has a considerable permanent dipole moment (Dapprox =4 D), which has not been taken explicitly into account in previous theoretical studies. In the present study, we include explicitly the effect of the permanent electric dipole on the dynamics of the incident electron using the generalized quantum defect theory, and we present the resulting cross section obtained. This demonstrates the possibility of applying generalized quantum defect theory to the dissociative recombination of molecular ions.

Douguet, Nicolas; Kokoouline, Viatcheslav; Greene, Chris H. [Department of Physics, University of Central Florida, Orlando, Florida 32816 (United States) and Laboratoire Aime Cotton, CNRS, Universite Paris-Sud XI, Orsay (France); Department of Physics and JILA, University of Colorado, Boulder, Colorado 80309 (United States)

2009-12-15T23:59:59.000Z

192

Apparatus and method for operating internal combustion engines from variable mixtures of gaseous fuels  

DOE Patents (OSTI)

An apparatus and method for utilizing any arbitrary mixture ratio of multiple fuel gases having differing combustion characteristics, such as natural gas and hydrogen gas, within an internal combustion engine. The gaseous fuel composition ratio is first sensed, such as by thermal conductivity, infrared signature, sound propagation speed, or equivalent mixture differentiation mechanisms and combinations thereof which are utilized as input(s) to a "multiple map" engine control module which modulates selected operating parameters of the engine, such as fuel injection and ignition timing, in response to the proportions of fuel gases available so that the engine operates correctly and at high efficiency irrespective of the gas mixture ratio being utilized. As a result, an engine configured according to the teachings of the present invention may be fueled from at least two different fuel sources without admixing constraints.

Heffel, James W. (Lake Matthews, CA); Scott, Paul B. (Northridge, CA); Park, Chan Seung (Yorba Linda, CA)

2011-11-01T23:59:59.000Z

193

Permanent-magnet helicon sources and arrays: A new type of rf plasma  

SciTech Connect

Helicon discharges are known for their ability to produce high densities of partially ionized plasma, their efficiency arising from an unusual mechanism of rf coupling. However, the requirement of a dc magnetic field has prevented their wide acceptance in industry. The use of permanent magnets greatly simplifies helicon sources, and arrays of small sources extend the use of helicons to the processing of large substrates. An eight-tube array was designed and constructed, and its density uniformity measured in a 53x165 cm{sup 2} chamber. Three innovations involved (a) the remote field of ring magnets, (b) a low-field density peak, and (c) rf power distribution. High-density plasmas uniform over large areas requires compatibility in all three areas.

Chen, Francis F.; Torreblanca, Humberto [University of California, Los Angeles, California 90095-1594 (United States)

2009-05-15T23:59:59.000Z

194

Design, Manufacture and Measurements of Permanent Quadrupole Magnets for Linac4  

E-Print Network (OSTI)

Compact quadrupole magnets are required for the CCDTL (Cell-Coupled Drift Tube Linac) of Linac 4, a 160 MeV linear accelerator of negative hydrogen ions which will replace the old 50 MeV proton Linac2 at CERN. The magnets, of an overall physical length of 140 mm and an aperture diameter of 45 mm, are based on Sm2Co17 blocks and can provide an integrated gradient of up to 1.6 Tesla. The magnetic field quality is determined by 4 ferromagnetic pole tips, aligned together with the permanent magnets blocks inside a structure made in a single piece. Tuning bars allow to individually trim the magnetic flux provided by each pole, to correct possible differences between blocks and to modify the field gradient intensity within about 20% of the nominal value. The paper describes and discusses the design, manufacture and magnetic measurements of a first prototype magnet.

Tommasini, D; Thonet, P; Vorozhtsov, A

2012-01-01T23:59:59.000Z

195

Computing the External Magnetic Scalar Potential due to an Unbalanced Six-Pole Permanent Magnet Motor  

SciTech Connect

The accurate computation of the external magnetic field from a permanent magnet motor is accomplished by first computing its magnetic scalar potential. In order to find a solution which is valid for any arbitrary point external to the motor, a number of proven methods have been employed. Firstly, A finite element model is developed which helps generate magnetic scalar potential values valid for points close to and outside the motor. Secondly, charge simulation is employed which generates an equivalent magnetic charge matrix. Finally, an equivalent multipole expansion is developed through the application of a toroidal harmonic expansion. This expansion yields the harmonic components of the external magnetic scalar potential which can be used to compute the magnetic field at any point outside the motor.

Selvaggi J, Salon S, Kwon O, Chari MVK

2007-02-12T23:59:59.000Z

196

Study on controlling chaos of permanent magnet synchronous motor in electric vehicles  

Science Journals Connector (OSTI)

The objective of this study is to analyse chaotic motion and its control in a Permanent Magnet Synchronous Motor (PMSM) in an Electric Vehicle (EV). Complex non-linear behaviours are observed over a range of parameter values in the bifurcation diagram. Hopf bifurcation and chaos may even occur in the PMSMs if the PMSMs are not properly sized. The Lyapunov exponent approach is utilised to identify the onset of chaotic motion and to verify the above analyses. Finally, an approach for effectively controlling a chaotic PMSM system is presented. The state feedback control procedure is employed to control chaotic motions in the PMSM effectively. Simulation results are presented to demonstrate the feasibility of the proposed approach.

Shun-Chang Chang; Hai-Ping Lin

2012-01-01T23:59:59.000Z

197

Regulatory standards for permanent disposal of spent nuclear fuel and high-level radioactive waste.  

SciTech Connect

This paper provides a summary of observations drawn from twenty years of personal experience in working with regulatory criteria for the permanent disposal of radioactive waste for both the Waste Isolation Pilot Plant repository for transuranic defense waste and the proposed Yucca Mountain repository for spent nuclear fuel and high-level wastes. Rather than providing specific recommendations for regulatory criteria, my goal here is to provide a perspective on topics that are fundamental to how high-level radioactive waste disposal regulations have been implemented in the past. What are the main questions raised relevant to long-term disposal regulations? What has proven effective in the past? Where have regulatory requirements perhaps had unintended consequences? New regulations for radioactive waste disposal may prove necessary, but the drafting of these regulations may be premature until a broad range of policy issues are better addressed. In the interim, the perspective offered here may be helpful for framing policy discussions.

Swift, Peter N.

2010-08-01T23:59:59.000Z

198

Permanent dipole magnets for the 8 GeV transfer line at FNAL  

SciTech Connect

The transfer line that will serve to transport 8 GeV protons from the Booster to the new Fermilab Main Injector has been built using permanent magnets. A total of 46 horizontal bend dipoles and 5 vertical bend dipoles were built for this beamline; 67 gradient magnets were also built. The magnets were built using magnetized strontium ferrite bricks. Thermal compensation of these bricks was effected by use of a nickel-iron alloy. The dipole magnets were built with a mean integrated strength of 0.56954 T-m, and an rms spread of 0.06%. The magnets were thermally cycled from 20{degrees}C to 0{degrees}C to condition the ferrite against irreversible thermal losses, and the compensation was measured with a flipcoil. The magnet strength was adjusted by varying the number of bricks installed at the magnet ends. Details of the assembly process and a summary of magnetic measurements are presented here.

Glass, H.D.; Brown, B.C.; Foster, G.W.; Fowler, W.B.; Haggard, J.E. [and others

1997-06-01T23:59:59.000Z

199

The permanent electric dipole moment of thorium sulfide, ThS  

SciTech Connect

Numerous rotational lines of the (18.26)1-X{sup 1}?{sup +} band system of thorium sulfide, ThS, were recorded near 547.6 nm at a resolution of approximately 30 MHz. Measurements were made under field-free conditions, and in the presence of a static electric field. The field-free spectrum was analyzed to produce rotational and ?-doubling parameters. The Stark shifts induced by the electric field were analyzed to determine permanent electric dipole moments, ?{sup -vector}{sub el}, of 4.58(10) D and 6.72(5) D for the X{sup 1}?{sup +} (v = 0) and (18.26)1 states, respectively. The results are compared with the predictions of previous and new electronic structure calculations for ThS, and the properties of isovalent ThO.

Le, Anh; Steimle, Timothy C., E-mail: Tsteimle@ASU.edu [Department of Chemistry and Biochemistry, Arizona State University, Tempe, Arizona 85287-1604 (United States); Heaven, Michael C. [Department of Chemistry, Emory University, Atlanta, Georgia 30322 (United States)] [Department of Chemistry, Emory University, Atlanta, Georgia 30322 (United States)

2014-01-14T23:59:59.000Z

200

Container for reprocessing and permanent storage of spent nuclear fuel assemblies  

DOE Patents (OSTI)

A single canister process container is described for reprocessing and permanent storage of spent nuclear fuel assemblies comprising zirconium-based cladding and fuel, which process container comprises a collapsible container, having side walls that are made of a high temperature alloy and an array of collapsible support means wherein the container is capable of withstanding temperature necessary to oxidize the zirconium-based cladding and having sufficient ductility to maintain integrity when collapsed under pressure. The support means is also capable of maintaining its integrity at a temperature necessary to oxidize the zirconium-based cladding. The process container also has means to introduce and remove fluids to and from the container. 10 figs.

Forsberg, C.W.

1992-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

On the Electrodynamics of Moving Permanent Dipoles in External Electromagnetic Fields  

E-Print Network (OSTI)

The classical theory of electrodynamics is built upon Maxwell's equations and the concepts of electromagnetic field, force, energy and momentum, which are intimately tied together by Poynting's theorem and the Lorentz force law. Whereas Maxwell's macroscopic equations relate the electric and magnetic fields to their material sources (i.e., charge, current, polarization and magnetization), Poynting's theorem governs the flow of electromagnetic energy and its exchange between fields and material media, while the Lorentz law regulates the back-and-forth transfer of momentum between the media and the fields. The close association of momentum with energy thus demands that the Poynting theorem and the Lorentz law remain consistent with each other, while, at the same time, ensuring compliance with the conservation laws of energy, linear momentum, and angular momentum. This paper shows how a consistent application of the aforementioned laws of electrodynamics to moving permanent dipoles (both electric and magnetic) b...

Mansuripur, Masud

2014-01-01T23:59:59.000Z

202

Permanent electric dipole moment of strontium monofluoride as a test of the accuracy of a relativistic coupled-cluster method  

Science Journals Connector (OSTI)

The permanent electric dipole moment of the X2?+ electronic ground state of the strontium monofluoride molecule is calculated using a relativistic coupled-cluster method. Our result is compared with those of other calculations and that of experiment. Individual contributions arising from different physical effects are presented. The result obtained suggests that the relativistic coupled-cluster method used in the present work is capable of yielding accurate results for the permanent electric dipole moments of molecules for which relativistic effects cannot be ignored.

V. S. Prasannaa; M. Abe; B. P. Das

2014-11-12T23:59:59.000Z

203

Permanent Electric Dipole Moment of Strontium Monofluoride as a Test of the Accuracy of a Relativistic Coupled Cluster Method  

E-Print Network (OSTI)

The permanent electric dipole moment of the X 2 {\\Sigma}+ electronic ground state of the strontium monofluoride molecule is calculated using a relativistic coupled cluster method. Our result is compared with those of other calculations and that of experiment. Individual contributions arising from different physical effects are presented. The result obtained suggests that the relativistic coupled cluster method used in the present work is capable of yielding accurate results for the permanent electric dipole moments of molecules for which relativistic effects cannot be ignored.

Prasannaa, V S; Das, B P

2014-01-01T23:59:59.000Z

204

Study of permanent-magnet couplings with progressive magnetization using an analytical formulation  

SciTech Connect

Permanent-magnet (PM) magnetic couplings are used in many industrial applications. They allow the transmission of a torque from a rotating part to another rotating part without any mechanical contact. They are used in sealed equipment to transmit a movement through a separation wall. They are also very useful in high security applications to avoid failures due to torque overload. Nonclassical structures of permanent-magnet cylindrical air-gap couplings with progressive magnetization are studied. In these couplings, parallelepiped magnets with nonclassical magnetization direction are used and stuck in ironless cores. The magnetization direction of each magnet is chosen to provide an optimal repartition of the induction in the air gap. This progressive magnetization allows very high values of pullout torque. The use of this type of structure with ironless cores and very high pull-out torque seems to be an advantageous way to minimize the inertia and maximize the pullout torque of a magnetic coupling. An efficient method to calculate the torque of such a coupling is presented, based on analytical formulas for forces between magnets. It allows the exact evaluation of the performance of the studied couplings when the main dimensions of the coupling are varying with small calculation time. In this paper the influence of the number of pole pairs, the influence of the number of magnets per pole, the influence of the magnets' thickness, the influence of the air-gap radius, and the influence of the length of the structure are studied and discussed. Then some general rules are presented for efficient design of such a coupling.

Charpentier, J.F.; Lemarquand, G.

1999-09-01T23:59:59.000Z

205

Adjuvant stereotactic permanent seed breast implant: A boost series in view of partial breast irradiation  

SciTech Connect

Purpose: The aim of this study was to use permanent seed implants in the breast and describe our experience with 15 cases, using iodine seed implants as a tumor bed boost. Methods and Materials: Breasts were fixed with a thermoplastic sheet, a template bridge applied, the thorax scanned and the images rotated to be perpendicular to the implant axis. Skin, heart, and lung were delineated. A preplan was made, prescribing 50 Gy to the clinical target volume (CTV), consisting in this boost series of nearly a quadrant. Iodine (125) seeds were stereotactically implanted through the template, and results were checked with a postplan computed tomographic (CT) scan. Results: The breast was immobilized reproducibly. Simulation, scanning, and implant were performed without difficulties. Preplan CTV D90% (the dose delivered to 90% of the CTV) was 66 Gy, and postoperative fluoroscopic or CT scan checks were satisfactory. Pre- and postplan dose-volume histogram showed good organ sparing: mean postplan skin, heart, and lung V30 Gy (the organ volume receiving a dose of 30 Gy) of 2 {+-} 2.2 mL, 0.24 {+-} 0.34 mL, and 3.5 {+-} 5 mL, respectively. No short-term toxicity above Grade 1 was noted, except for transient Grade 3 neuropathy in 1 patient. Conclusions: Seeds remained in the right place, as assessed by fluoroscopy, absence of significant pre- to postplan dose-volume histogram change for critical organs, and total irradiated breast volume. The method could be proposed as a boost when high dosimetric selectivity is required (young patients after cardiotoxic chemotherapy for left-sided cancer). This boost series was a preliminary step before testing partial breast irradiation by permanent seed implant in a prospective trial.

Jansen, Nicolas [Department of Radiation Oncology, Liege University Hospital, Liege (Belgium)]. E-mail: nicolas.jansen@chu.ulg.ac.be; Deneufbourg, Jean-Marie [Department of Radiation Oncology, Liege University Hospital, Liege (Belgium); Nickers, Philippe [Department of Radiation Oncology, Liege University Hospital, Liege (Belgium)

2007-03-15T23:59:59.000Z

206

Mission Operations & Data Systems  

E-Print Network (OSTI)

Mission Operations & Data Systems The LASP Mission Operations & Data Systems (MO&DS) group staffs and instruments. Operational software acts like the health systems in a body, ensuring that temperature, energy. The software monitors the health of on-board systems; anything unusual is flagged and sent to mission operators

Mojzsis, Stephen J.

207

ARM - SGP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements with the highest priority, on which the existing experimental designs are based, are regular routine observations, as specified in the ARM Program Plan, 1990 (U.S. Department of Energy 1990). Scientifically and logistically, routine operations also serve as the basis and background for all nonroutine operations, including

208

CRADA Final Report: Application of Dual-Mode Invertor Control to Commercially Available Radial-Gap Permanent Magnet Motors - Vol. 1  

SciTech Connect

John Deere and Company (Deere), their partner, UQM Technologies, Inc. (UQM), and the Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machinery Research Center (PEEMRC) recently completed work on the cooperative research and development agreement (CRADA) Number ORNL 04-0691 outlined in this report. CRADA 04-0691 addresses two topical issues of interest to Deere: (1) Improved characterization of hydrogen storage and heat-transfer management; and (2) Potential benefits from advanced electric motor traction-drive technologies. This report presents the findings of the collaborative examination of potential operational and cost benefits from using ORNL/PEEMRC dual-mode inverter control (DMIC) to drive permanent magnet (PM) motors in applications of interest to Deere. DMIC was initially developed and patented by ORNL to enable PM motors to be driven to speeds far above base speed where the back-electromotive force (emf) equals the source voltage where it is increasingly difficult to inject current into the motor. DMIC is a modification of conventional phase advance (CPA). DMIC's dual-speed modes are below base speed, where traditional pulse-width modulation (PWM) achieves maximum torque per ampere (amp), and above base speed, where six-step operation achieves maximum power per amp. The modification that enables DMIC adds two anti-parallel thyristors in each of the three motor phases, which consequently adds the cost of six thyristors. Two features evaluated in this collaboration with potential to justify the additional thyristor cost were a possible reduction in motor cost and savings during operation because of higher efficiency, both permitted because of lower current. The collaborative analysis showed that the reduction of motor cost and base cost of the inverter was small, while the cost of adding six thyristors was greater than anticipated. Modeling the DMIC control displayed inverter efficiency gains due to reduced current, especially under light load and higher speed. This current reduction, which is the salient feature of DMIC, may be significant when operating duty cycles have low loads at high frequencies. Reduced copper losses make operation more efficient thereby reducing operating costs. In the Deere applications selected for this study, the operating benefit was overshadowed by the motor's rotational losses. Rotational losses of Deere 1 and Deere 2 dominate the overall drive efficiency so that their reduction has the greatest potential to improve performance. A good follow-up project would be to explore cost erective ways to reduce the rotational losses buy 66%.

Lawler, J.S. (U. Tennessee-Knoxville); McKeever, J.W.; Downing, M.E.; Stahlhut, R.D (John Deere); Bremmer, R. (John Deere); Shoemaker, J.M. (John Deere); Seksarian, A.K. (john Deere); Poore, B. (John Deere); Lutz, J. (UQM)

2006-05-01T23:59:59.000Z

209

Global modeling of cancer gene expression signa-Cancer leads to permanent changes in cell's physiological state and various  

E-Print Network (OSTI)

Global modeling of cancer gene expression signa- tures Cancer leads to permanent changes in cell cancer types. Less is known about the underlying biological processes, or relationships between different cancer types with respect to these changes. While each specific cancer type has a set of unique

Kaski, Samuel

210

On leave at MIT. Permanent address: Departamento de Quimica Inorga nica, Universidad de La Laguna, E-38200 La Laguna, Tenerife  

E-Print Network (OSTI)

interactions between electrons, such as magnetic coupling, can be strongly depen- dent on the crystallographic On leave at MIT. Permanent address: Departamento de Qui´mica Inorga´ nica, Universidad de La OF SOLID STATE CHEMISTRY 130, 35--41 (1997) ARTICLE NO. SC967267 Synthesis, Crystal Structure, and Magnetic

zur Loye, Hans-Conrad

211

2452 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 39, NO. 11, NOVEMBER 2011 Permanent-Magnet Helicon Discharge Array  

E-Print Network (OSTI)

) which are powered by radio-frequency generators. Helicon-wave sources have been found to create higher, which consists of an array of eight tubes driven in parallel by a 3.2-kW RF supply at 13.56 MHz. Between2452 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 39, NO. 11, NOVEMBER 2011 Permanent-Magnet Helicon

Chen, Francis F.

212

The ground state of the polar alkali-Strontium molecules: potential energy curve and permanent dipole moment  

E-Print Network (OSTI)

The ground state of the polar alkali-Strontium molecules: potential energy curve and permanent In this study, we investigate the structure of the polar alkali-Strontium diatomic molecules as possible already been reported, while quantum degeneracy in Ytterbium [22, 23], Calcium [24], and Strontium [25, 26

Paris-Sud XI, Université de

213

516 IEEE TRANSACTIONS ON MAGNETICS, VOL. 43, NO. 2, FEBRUARY 2007 Analysis of Permanent-Magnet Machines Using an  

E-Print Network (OSTI)

-Magnet Machines Using an Anisotropic Magnetostatic Continuum Formulation Wensen Wang, Danhong Zhong, and Heath densities in permanent-magnet machine designs. This formulation offers certain advantages over traditional the tooth/winding region of the machine by using anisotropic permeability. Here, we derive spatial harmonics

Hofmann, Heath F.

214

Permanent Magnet Assisted Synchronous Reluctance Machine (PMa-SynRM) Design and Performance Analysis for Fan and Pump Applications  

E-Print Network (OSTI)

...................................................................................................... 47 Fig 3-12: Reluctance torque generated by each rotor at rated current and maximum torque angle. ................................................................................... 48 xi Page Fig 3-13: FEA analysis field output on the PMa... PERMANENT MAGNET ASSISTED SYNCHRONOUS RELUCTANCE MACHINE (PMA-SYNRM) DESIGN AND PERFORMANCE ANALYSIS FOR FAN AND PUMP APPLICATIONS A Dissertation by ROBERT VARTANIAN Submitted to the Office of Graduate and Professional Studies...

Vartanian, Robert

2014-08-13T23:59:59.000Z

215

Using electrical, magnetic and acoustic sensors to detect damage in segmental concrete pipes subjected to permanent ground displacement  

E-Print Network (OSTI)

that the ac- tual repair cost of the pipelines reflects only a fraction of the total costs associate Permanent ground deformation Segmental concrete pipeline a b s t r a c t This paper describes results of an experimental study that used sensing methods for monitoring damage along segmental concrete pipelines resulting

Lynch, Jerome P.

216

Evaluation of Options for Permanent Geologic Disposal of Spent NuclearFuel and High-Level Radioactive Waste  

Energy.gov (U.S. Department of Energy (DOE))

[In Support of a Comprehensive National Nuclear Fuel Cycle Strategy, Volumes I and II (Appendices)] This study provides a technical basis for informing policy decisions regarding strategies for the management and permanent disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States requiring geologic isolation.

217

Design Procedure for a Very High Speed Slotless Permanent Magnet Motor Pierre-Daniel Pfister, Student Member, IEEE and Yves Perriard, Senior Member, IEEE  

E-Print Network (OSTI)

Design Procedure for a Very High Speed Slotless Permanent Magnet Motor Pierre-Daniel Pfister speed slotless permanent magnet motor design procedure using an analyti- cal model. The multiphysics in the center, a magnet, an air gap, and the stator yoke. In our case, the shaft radius is set to zero

Psaltis, Demetri

218

Abstract --This paper deals a double layer and a single layer Flux-Switching Permanent Magnet (FSPM) motors for a fault  

E-Print Network (OSTI)

Abstract --This paper deals a double layer and a single layer Flux-Switching Permanent Magnet (FSPM-Switching Permanent Magnet (FSPM) motors attract more and more attentions in the critical application as the Hybrid and will disturb the normal phases because of the magnetic coupling between phases. In order to compare the fault

Paris-Sud XI, Université de

219

Improving exchange-spring nanocomposite permanent magnets J. S. Jiang, J. E. Pearson, Z. Y. Liu, B. Kabius, S. Trasobares, D. J. Miller, and S. D. Bader  

E-Print Network (OSTI)

Improving exchange-spring nanocomposite permanent magnets J. S. Jiang, J. E. Pearson, Z. Y. Liu, B.1063/1.1828225] The "exchange-spring" mechanism in nanocomposite magnets,1 where the interfacial exchange coupling between to ul- trastrong permanent magnets whose energy product BH max is more than twice that of Nd­Fe­B.2

Liu, J. Ping

220

Direct - drive permanent magnet synchronous generator design for hydrokinetic energy extraction .  

E-Print Network (OSTI)

??"Hydrokinetic turbines deliver lower shaft speeds when compared to both steam and wind turbines. Hence, a water wheel generator must operate at speeds as low… (more)

Kashyap, Amshumaan Raghunatha

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Testing, Analysis, and Model Verification of Miniature Linear Permanent Magnet Generators.  

E-Print Network (OSTI)

??The military has become increasingly dependent on mobile electronic equipment to ensure success and safety of soldiers in remote locations. To operate the electronics, soldiers… (more)

Rippee, Michael Ray

2012-01-01T23:59:59.000Z

222

CONDUCT OF OPERATIONS (CO)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONDUCT OF OPERATIONS (CO) CONDUCT OF OPERATIONS (CO) OBJECTIVE TA-55 SST Facility NNSA ORR Implementation Plan 1 1 CO.1 The formality and discipline of operations is adequate to conduct work safely and programs are inplace to maintain this formality and discipline. (Core Requirement 13) Criteria 1. Programmatic elements of conduct of operations are in place for TA-55 SST operations. 2. The TA-55 SST operations personnel adequately demonstrate the principles of conduct ofoperations requirements during the shift performance period. Approach Record Reviews: Review procedures and other facility documents to verify compliance with conduct of operations principles. Interviews: Interview a sampling of the TA-55 SST associated personnel to validate their understanding of the conduct of operations principles (e.g., procedure usage,

223

Transforming Commercial Building Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

224

Transforming Commercial Building Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

225

Quantum Operations and Measurement  

E-Print Network (OSTI)

the Stinespring dilation form of E . 6 #12; II: operator­sum representation E(#) = Tr env # U(## # env )U

Seevinck, Michiel

226

Challenge # 3 ? Operational Issues  

Energy.gov (U.S. Department of Energy (DOE))

Fernando Preto presentation on May 9, 2012, at the Pyrolysis Oil Workshop on Challenge #3 Operational Issues.

227

Measurements of vacuum magnetic birefringence using permanent dipole magnets: the PVLAS experiment  

E-Print Network (OSTI)

The PVLAS collaboration is presently assembling a new apparatus (at the INFN section of Ferrara, Italy) to detect vacuum magnetic birefringence (VMB). VMB is related to the structure of the QED vacuum and is predicted by the Euler-Heisenberg-Weisskopf effective Lagrangian. It can be detected by measuring the ellipticity acquired by a linearly polarised light beam propagating through a strong magnetic field. Using the very same optical technique it is also possible to search for hypothetical low-mass particles interacting with two photons, such as axion-like (ALP) or millicharged particles (MCP). Here we report results of a scaled-down test setup and describe the new PVLAS apparatus. This latter one is in construction and is based on a high-sensitivity ellipsometer with a high-finesse Fabry-Perot cavity ($>4\\times 10^5$) and two 0.8 m long 2.5 T rotating permanent dipole magnets. Measurements with the test setup have improved by a factor 2 the previous upper bound on the parameter $A_e$, which determines the strength of the nonlinear terms in the QED Lagrangian: $A_e^{\\rm (PVLAS)} coupling constant of ALPs to two photons and confirmation of previous limits on the fractional charge of millicharged particles is given.

F. Della Valle; U. Gastaldi; G. Messineo; E. Milotti; R. Pengo; L. Piemontese; G. Ruoso; G. Zavattini

2013-01-21T23:59:59.000Z

228

Performance of a permanent-magnet helicon source at 27 and 13 MHz  

SciTech Connect

A small helicon source is used to create dense plasma and inject it into a large chamber. A permanent magnet is used for the dc magnetic field (B-field), making the system very simple and compact. Though theory predicts that better antenna coupling will occur at 27.12 MHz, it was found that 13.56 MHz surprisingly gives even higher density due to practical effects not included in theory. Complete density n and electron temperature T{sub e} profiles are measured at three distances below the source. The plasma inside the source is also measured with a special probe, even under the antenna. The density there is lower than expected because the plasma created is immediately ejected, filling the experimental chamber. The advantage of helicons over inductively coupled plasmas (with no B-field) increases with RF power. At high B-fields, edge ionization by the Trivelpiece-Gould mode can be seen. These results are useful for design of multiple-tube, large-area helicon sources for plasma etching and deposition because problems are encountered which cannot be foreseen by theory alone.

Chen, Francis F. [Electrical Engineering Department, University of California, Los Angeles, California 90095 (United States)

2012-09-15T23:59:59.000Z

229

H-mode accelerating structures with permanent-magnet quadrupole beam focusing  

We have developed high-efficiency normal-conducting rf accelerating structures by combining H -mode resonator cavities and a transverse beam focusing by permanent-magnet quadrupoles (PMQ), for beam velocities in the range of a few percent of the speed of light. The shunt impedance of interdigital H -mode (IH-PMQ) structures is 10–20 times higher than that of a conventional drift-tube linac, while the transverse size is 4–5 times smaller. Results of the combined 3D modeling—electromagnetic computations, multiparticle beam-dynamics simulations with high currents, and thermal-stress analysis—for an IH-PMQ accelerator tank are presented. The accelerating-field profile in the tank is tuned to provide the best propagation of a 50-mA deuteron beam using coupled iterations of electromagnetic and beam-dynamics modeling. Measurements of a cold model of the IH-PMQ tank show a good agreement with the calculations. Examples of cross-bar H -mode structures with PMQ focusing for higher beam velocities are also presented. H -PMQ accelerating structures following a short radio-frequency quadrupole accelerator can be used both in the front end of ion linacs or in stand-alone applications.

Kurennoy, S. S.; Rybarcyk, L. J.; O’Hara, J. F.; Olivas, E. R.; Wangler, T. P.

2012-09-01T23:59:59.000Z

230

Hanford Site Permanent Isolation Surface Barrier Development Program: Fiscal year 1992 and 1993 highlights  

SciTech Connect

The Hanford Site Permanent Isolation Surface Barrier Development Program was jointly developed by the Pacific Northwest Laboratory and Westinghouse Hanford Company to design and test an earthen cover system that can be used to inhibit water infiltration; plant, animal, and human intrusion; and wind and water erosion. Kaiser Engineers Hanford Company provided engineering design support for the program. Work on barrier design has been under way at Hanford for nearly 10 years. The comprehensive development of a long-term barrier, formerly the Hanford Site Protective Barrier Development Program, was initiated in FY 1986, and a general field-tested design is expected to be completed by FY 1998. Highlights of efforts in FY 1992 and FY 1993 included the resumption of field testing, the completion of the prototype barrier design, and the convening of an external peer review panel, which met twice with the barrier development team. The review panel provided helpful guidance on current and future barrier development activities, while commending the program for its significant technical contributions to innovative barrier technology development.

Cadwell, L.L.; Link, S.O.; Gee, G.W. [eds.

1993-09-01T23:59:59.000Z

231

Control of Two Permanent Magnet Machines Using a Five-Leg Inverter for Automotive Applications  

SciTech Connect

This paper presents digital control schemes for control of two permanent magnet (PM) machines in an integrated traction and air-conditioning compressor drive system for automotive applications. The integrated drive system employs a five-leg inverter to power a three-phase traction PM motor and a two-phase compressor PM motor by tying the common terminal of the two-phase motor to the neutral point of the three-phase motor. Compared to a three-phase or a standalone two-phase inverter, it eliminates one phase leg and shares the control electronics between the two drives, thus significantly reducing the component count of the compressor drive. To demonstrate that the speed and torque of the two PM motors can be controlled independently, a control strategy was implemented in a digital signal processor, which includes a rotor flux field orientation based control (RFOC) for the three-phase motor, a similar RFOC and a position sensorless control in the brushless dc (BLDC) mode for the two-phase motor. Control implementation issues unique to a two-phase PM motor are also discussed. Test results with the three-phase motor running in the ac synchronous (ACS) mode while the two-phase motor either in the ACS or the BLDC mode are included to verify the independent speed and torque control capability of the integrated drive.

Su, Gui-Jia [ORNL; Tang, Lixin [ORNL; Huang, Xianghui [GE Global Research

2006-01-01T23:59:59.000Z

232

COLLECTION OF AIRBORNE PARTICLES BY A HIGH-GRADIENT PERMANENT MAGNETIC METHOD  

SciTech Connect

We report on the use of magnetic force in collection of airborne particles by a high- gradient permanent magnetic separation (HGPMS) device. Three aerosol particles of different magnetic susceptibility (NaCl, CuO, and Fe2O3) were generated in the electrical mobility size range of 10 to 200 nm and were used to study HGPMS collection. One HGPMS matrix element, made of stainless steel wool, was used in the device configuration. Three flow rates were selected to simulate the environmental wind speeds of interest to the study. Magnetic force was found to exhibit an insignificant effect on the separation of NaCl particles, even in the HGPMS configuration. Diffusion was a major mechanism in the removal of the diamagnetic particles; however, diffusion is insignificant under the influence of a high-gradient magnetic field for paramagnetic or ferromagnetic particles. The HGPMS showed high-performance collection (> 99%) of paramagnetic CuO and ferromagnetic Fe2O3 particles for particle sizes greater than or equal to 60 nm. As the wind speed increases, the influence of the magnetic force weakens, and the capability to remove particles from the gas stream diminishes. The results suggest that the HGPMS principle could be explored for development of an advanced miniaturized passive aerosol collector.

Cheng, Mengdawn [ORNL; Allman, Steve L [ORNL; Ludtka, Gerard Michael [ORNL; Avens, Larry R [ORNL

2014-01-01T23:59:59.000Z

233

Maximum power point tracking of permanent magnet wind turbines equipped with direct matrix converter  

Science Journals Connector (OSTI)

This paper presents a novel control method for Maximum Power Point Tracking of wind turbines (WTs) equipped with a Permanent Magnet Synchronous Generator (PMSG) and a Direct Matrix Converter (DMC). The method calculates the optimum wind turbine speed and maximizes the extracted power from wind turbine. This is done by Hill Climb Search method which is simple and does not need to know the generator parameters and no need to solve the complicated differential equations of generator. WT rotor speed is compared with its optimal value and then DMC controls WT until its rotor speed reaches its optimum value. Under this situation maximum power is extracted from WT and is injected to the grid with unity power factor. It is implemented by controlling the phase and the amplitude of the DMC output voltage by Venturini switching method. Simulations are done on a 2?MW PMSG WT in MATLAB/SIMULINK to obtain the results the wind speed was varied both using the Van Der Hoven method and changing the wind step. The obtained results verify the accuracy and simplicity of proposed method.

2014-01-01T23:59:59.000Z

234

Carbide/nitride grain refined rare earth-iron-boron permanent magnet and method of making  

DOE Patents (OSTI)

A method of making a permanent magnet is disclosed wherein (1) a melt is formed having a base alloy composition comprising RE, Fe and/or Co, and B (where RE is one or more rare earth elements) and (2) TR (where TR is a transition metal selected from at least one of Ti, Zr, Hf, V, Nb, Ta, Cr, Mo, W, and Al) and at least one of C and N are provided in the base alloy composition melt in substantially stoichiometric amounts to form a thermodynamically stable compound (e.g. TR carbide, nitride or carbonitride). The melt is rapidly solidified in a manner to form particulates having a substantially amorphous (metallic glass) structure and a dispersion of primary TRC, TRN and/or TRC/N precipitates. The amorphous particulates are heated above the crystallization temperature of the base alloy composition to nucleate and grow a hard magnetic phase to an optimum grain size and to form secondary TRC, TRN and/or TRC/N precipitates dispersed at grain boundaries. The crystallized particulates are consolidated at an elevated temperature to form a shape. During elevated temperature consolidation, the primary and secondary precipitates act to pin the grain boundaries and minimize deleterious grain growth that is harmful to magnetic properties. 33 figs.

McCallum, R.W.; Branagan, D.J.

1996-01-23T23:59:59.000Z

235

Submergible barge retrievable storage and permanent disposal system for radioactive waste  

DOE Patents (OSTI)

A submergible barge and process for submerging and storing radioactive waste material along a seabed. A submergible barge receives individual packages of radwaste within segregated cells. The cells are formed integrally within the barge, preferably surrounded by reinforced concrete. The cells are individually sealed by a concrete decking and by concrete hatch covers. Seawater may be vented into the cells for cooling, through an integral vent arrangement. The vent ducts may be attached to pumps when the barge is bouyant. The ducts are also arranged to promote passive ventilation of the cells when the barge is submerged. Packages of the radwaste are loaded into individual cells within the barge. The cells are then sealed and the barge is towed to the designated disposal-storage site. There, the individual cells are flooded and the barge will begin descent controlled by a powered submarine control device to the seabed storage site. The submerged barge will rest on the seabed permanently or until recovered by a submarine control device.

Goldsberry, Fred L. (Spring, TX); Cawley, William E. (Richland, WA)

1981-01-01T23:59:59.000Z

236

Operations and maintenance philosophy  

SciTech Connect

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

237

Operating System Resource Management  

E-Print Network (OSTI)

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

238

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

239

Ground state of the polar alkali-metal-atom-strontium molecules: Potential energy curve and permanent dipole moment  

SciTech Connect

In this study, we investigate the structure of the polar alkali-metal-atom-strontium diatomic molecules as possible candidates for the realization of samples of ultracold polar molecular species not yet investigated experimentally. Using a quantum chemistry approach based on effective core potentials and core polarization potentials, we model these systems as effective three-valence-electron systems, allowing for calculation of electronic properties with full configuration interaction. The potential curve and the permanent dipole moment of the {sup 2}{Sigma}{sup +} ground state are determined as functions of the internuclear distance for LiSr, NaSr, KSr, RbSr, and CsSr molecules. These molecules are found to exhibit a significant permanent dipole moment, though smaller than those of the alkali-metal-atom-Rb molecules.

Guerout, R. [Laboratoire Kastler-Brossel, CNRS, ENS, Univ Pierre et Marie Curie case 74, Campus Jussieu, F-75252 Paris Cedex 05 (France); Aymar, M.; Dulieu, O. [Laboratoire Aime Cotton, CNRS, UPR3321, Bat. 505, Univ Paris-Sud, F-91405 Orsay Cedex (France)

2010-10-15T23:59:59.000Z

240

The ground state of the polar alkali-Strontium molecules: potential energy curve and permanent dipole moment  

E-Print Network (OSTI)

In this study, we investigate the structure of the polar alkali-Strontium diatomic molecules as possible candidates for the realization of samples of new species of ultracold polar molecules. Using a quantum chemistry approach based on Effective Core Potentials and Core Polarization Potentials, we model these systems as effective three valence electron systems, allowing for calculation of electronic properties with Full Configuration Interaction. The potential curve and the permanent dipole moment of the $^2\\Sigma^+$ ground state are determined as functions of the internuclear distances for LiSr, NaSr, KSr, RbSr, and CsSr molecules. These molecules are found to exhibit a significant permanent dipole moment, though smaller than those of the alkali-Rb molecules.

Romain Guérout; Mireille Aymar; Olivier Dulieu

2010-07-12T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Processing and Protection of Rare Earth Permanent Magnet Particulate for Bonded Magnet Applications  

SciTech Connect

Rapid solidification of novel mixed rare earth-iron-boron, MRE{sub 2}Fe{sub 14}B (MRE = Nd, Y, Dy; currently), magnet alloys via high pressure gas atomization (HPGA) have produced similar properties and structures as closely related alloys produced by melt spinning (MS) at low wheel speeds. Recent additions of titanium carbide and zirconium to the permanent magnet (PM) alloy design in HPGA powder (using He atomization gas) have made it possible to achieve highly refined microstructures with magnetic properties approaching melt spun particulate at cooling rates of 10{sup 5}-10{sup 6}K/s. By producing HPGA powders with the desirable qualities of melt spun ribbon, the need for crushing ribbon was eliminated in bonded magnet fabrication. The spherical geometry of HPGA powders is more ideal for processing of bonded permanent magnets since higher loading fractions can be obtained during compression and injection molding. This increased volume loading of spherical PM powder can be predicted to yield a higher maximum energy product (BH){sub max} for bonded magnets in high performance applications. Passivation of RE-containing powder is warranted for the large-scale manufacturing of bonded magnets in applications with increased temperature and exposure to humidity. Irreversible magnetic losses due to oxidation and corrosion of particulates is a known drawback of RE-Fe-B based alloys during further processing, e.g. injection molding, as well as during use as a bonded magnet. To counteract these effects, a modified gas atomization chamber allowed for a novel approach to in situ passivation of solidified particle surfaces through injection of a reactive gas, nitrogen trifluoride (NF{sub 3}). The ability to control surface chemistry during atomization processing of fine spherical RE-Fe-B powders produced advantages over current processing methodologies. In particular, the capability to coat particles while 'in flight' may eliminate the need for post atomization treatment, otherwise a necessary step for oxidation and corrosion resistance. Stability of these thin films was attributed to the reduction of each RE's respective oxide during processing; recognizing that fluoride compounds exhibit a slightly higher (negative) free energy driving force for formation. Formation of RE-type fluorides on the surface was evidenced through x-ray photoelectron spectroscopy (XPS). Concurrent research with auger electron spectroscopy has been attempted to accurately quantify the depth of fluoride formation in order to grasp the extent of fluorination reactions with spherical and flake particulate. Gas fusion analysis on coated powders (dia. <45 {micro}m) from an optimized experiment indicated an as-atomized oxygen concentration of 343ppm, where typical, nonpassivated RE atomized alloys exhibit an average of 1800ppm oxygen. Thermogravimetric analysis (TGA) on the same powder revealed a decreased rate of oxidation at elevated temperatures up to 300 C, compared to similar uncoated powder.

Peter Kelly Sokolowski

2007-12-01T23:59:59.000Z

242

An algorithm for efficient metal artifact reductions in permanent seed implants  

SciTech Connect

Purpose: In permanent seed implants, 60 to more than 100 small metal capsules are inserted in the prostate, creating artifacts in x-ray computed tomography (CT) imaging. The goal of this work is to develop an automatic method for metal artifact reduction (MAR) from small objects such as brachytherapy seeds for clinical applications. Methods: The approach for MAR is based on the interpolation of missing projections by directly using raw helical CT data (sinogram). First, an initial image is reconstructed from the raw CT data. Then, the metal objects segmented from the reconstructed image are reprojected back into the sinogram space to produce a metal-only sinogram. The Steger method is used to determine precisely the position and edges of the seed traces in the raw CT data. By combining the use of Steger detection and reprojections, the missing projections are detected and replaced by interpolation of non-missing neighboring projections. Results: In both phantom experiments and patient studies, the missing projections have been detected successfully and the artifacts caused by metallic objects have been substantially reduced. The performance of the algorithm has been quantified by comparing the uniformity between the uncorrected and the corrected phantom images. The results of the artifact reduction algorithm are indistinguishable from the true background value. Conclusions: An efficient algorithm for MAR in seed brachytherapy was developed. The test results obtained using raw helical CT data for both phantom and clinical cases have demonstrated that the proposed MAR method is capable of accurately detecting and correcting artifacts caused by a large number of very small metal objects (seeds) in sinogram space. This should enable a more accurate use of advanced brachytherapy dose calculations, such as Monte Carlo simulations.

Xu Chen; Verhaegen, Frank; Laurendeau, Denis; Enger, Shirin A.; Beaulieu, Luc [Departement de Radio-Oncologie et Centre de Recherche en Cancerologie, Universite Laval, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada) and Departement de Genie Electrique et Genie Informatique, Laboratoire de Vision et Systemes Numeriques, Universite Laval, Quebec, Quebec G1K 7P4 (Canada); Department of Radiation Oncology (MAASTRO), GROW-School for Oncology and Developmental Biology, Maastricht University Medical Center, Maastricht 6201 BN (Netherlands) and Oncology Department, Montreal General Hospital, McGill University, 1650 Cedar Avenue, Montreal, Quebec H3G 1A4 (Canada); Departement de Genie Electrique et Genie Informatique, Laboratoire de Vision et Systemes Numeriques, Universite Laval, Quebec, Quebec G1K 7P4 (Canada); Departement de Radio-Oncologie et Centre de Recherche en Cancerologie, Universite Laval, Centre Hospitalier Universitaire de Quebec, 11 Co circumflex te du Palais, Quebec, Quebec G1R 2J6 (Canada); Departement de Radio-Oncologie et Centre de Recherche en Cancerologie, Universite Laval, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada) and Departement de Physique, de Genie Physique et d'Optique, Universite Laval, Quebec, Quebec G1K 7P4 (Canada)

2011-01-15T23:59:59.000Z

243

High-Energy Permanent Magnets for Hybrid Vehicles and Alternative Energy Uses  

SciTech Connect

The report summarizes research undertaken by a multidisciplinary team aimed at the development of the next generation high-energy permanent magnets. The principal approach was relied on bottom-up fabrication of anisotropic nanocomposite magnets. Our efforts resulted in further development of the theoretical concept and fabrication principles for the nanocomposites and in synthesis of a range of rare-earth-based hard magnetic nanoparticles. Even though we did not make a breakthrough in the assembly of these hard magnetic particles with separately prepared Fe(Co) nanoparticles and did not obtain a compact nanocomposite magnet, our performed research will help to direct the future efforts, in particular, towards nano-assembly via coating, when the two phases which made the nanocomposite are first organized in core-shell-structured particles. Two other approaches were to synthesize (discover) new materials for the traditional singe-material magnets and the nanocomposite magnets. Integrated theoretical and experimental efforts lead to a significant advance in nanocluster synthesis technique and yielded novel rare-earth-free nanostructured and nanocomposite materials. Examination of fifteen R-Fe-X alloy systems (R = rare earth), which have not been explored earlier due to various synthesis difficulties reveal several new ferromagnetic compounds. The research has made major progress in bottom-up manufacturing of rare-earth-containing nanocomposite magnets with superior energy density and open new directions in development of higher-energy-density magnets that do not contain rare earths. The advance in the scientific knowledge and technology made in the course of the project has been reported in 50 peer-reviewed journal articles and numerous presentations at scientific meetings.

Hadjipanayis, George C. [University of Delaware] [University of Delaware; McCallum, William R. [Ames Laboratory] [Ames Laboratory; Sellmyer, David J. [University of Nebraska, Lincoln] [University of Nebraska, Lincoln; Harris, Vincent [Northeastern University] [Northeastern University; Carpenter, Everett E. [Virginia Commonwealth University] [Virginia Commonwealth University; Liu, Jinfang [Electron Energy Corporation] [Electron Energy Corporation

2013-12-17T23:59:59.000Z

244

Frequent biphasic cellular responses of permanent fish cell cultures to deoxynivalenol (DON)  

SciTech Connect

Contamination of animal feed with mycotoxins is a major problem for fish feed mainly due to usage of contaminated ingredients for production and inappropriate storage of feed. The use of cereals for fish food production further increases the risk of a potential contamination. Potential contaminants include the mycotoxin deoxynivalenol (DON) which is synthesized by globally distributed fungi of the genus Fusarium. The toxicity of DON is well recognized in mammals. In this study, we confirm cytotoxic effects of DON in established permanent fish cell lines. We demonstrate that DON is capable of influencing the metabolic activity and cell viability in fish cells as determined by different assays to indicate possible cellular targets of this toxin. Evaluation of cell viability by measurement of membrane integrity, mitochondrial activity and lysosomal function after 24 h of exposure of fish cell lines to DON at a concentration range of 0-3000 ng ml{sup -1} shows a biphasic effect on cells although differences in sensitivity occur. The cell lines derived from rainbow trout are particularly sensitive to DON. The focus of this study lies, furthermore, on the effects of DON at different concentrations on production of reactive oxygen species (ROS) in the different fish cell lines. The results show that DON mainly reduces ROS production in all cell lines that were used. Thus, our comparative investigations reveal that the fish cell lines show distinct species-related endpoint sensitivities that also depend on the type of tissue from which the cells were derived and the severity of exposure. - Highlights: > DON uptake by cells is not extensive. > All fish cell lines are sensitive to DON. > DON is most cytotoxic to rainbow trout cells. > Biphasic cellular responses were frequently observed. > Our results are similar to studies on mammalian cell lines.

Pietsch, Constanze, E-mail: constanze.pietsch@unibas.ch [University Basel, Man-Society-Environment, Department of Environmental Sciences, Vesalgasse 1, CH-4051 Basel (Switzerland); Bucheli, Thomas D.; Wettstein, Felix E. [Agroscope Reckenholz-Taenikon (ART), Research Station ART, Reckenholzstrasse 191, CH-8046 Zuerich (Switzerland); Burkhardt-Holm, Patricia [University Basel, Man-Society-Environment, Department of Environmental Sciences, Vesalgasse 1, CH-4051 Basel (Switzerland)

2011-10-01T23:59:59.000Z

245

Building Operator Certification  

E-Print Network (OSTI)

programmed settings review ? Verify damper settings ? Check static pressure sensor calibration ? Review occupant complaint records and remedies ? Review established temperature set points HVAC Controls Operational Review ESL-KT-13-12-49 CATEE 2013: Clean... Operator Certification Energy Efficiency through Operator Training BOC Has Two Levels • Level I: Building Systems Maintenance ? Two or more years experience (5 yrs avg) ? Outcome: Basic understanding of electrical, HVAC and lighting systems...

Lilley, D.

2013-01-01T23:59:59.000Z

246

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

247

Business Operations Contacts  

Office of Energy Efficiency and Renewable Energy (EERE)

If you have a question for the Office of Business Operations, you can use this contact information to reach the office you're interested in:

248

Semicausal operations are semilocalizable  

E-Print Network (OSTI)

We prove a conjecture by DiVincenzo, which in the terminology of Preskill et al. [quant-ph/0102043] states that ``semicausal operations are semilocalizable''. That is, we show that any operation on the combined system of Alice and Bob, which does not allow Bob to send messages to Alice, can be represented as an operation by Alice, transmitting a quantum particle to Bob, and a local operation by Bob. The proof is based on the uniqueness of the Stinespring representation for a completely positive map. We sketch some of the problems in transferring these concepts to the context of relativistic quantum field theory.

Eggeling, T; Werner, R F

2002-01-01T23:59:59.000Z

249

Fermilab | Tevatron | Tevatron Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Fermilab's Accelerator Complex Fermilab's Accelerator Complex has 10 accelerators. The Tevatron, which shuts down on Sept. 30, is one of those accelerators. The...

250

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

251

Richland Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

treatment and the data should be available by the end of next week. * Status Conduct of Operations There have been several small incidents recently where observations of work...

252

Challenge # 3 ? Operational Issues  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Potential for a renewable heating oil substitution Challenge 3 - Operational Issues What are the most significant barriers to overcome in each market segment? Fernando Preto The...

253

.JETEQUIPMENT &TOOLS OPERATOR'S MANUAL  

E-Print Network (OSTI)

.JETEQUIPMENT &TOOLS OPERATOR'S MANUAL JDP-14J/14M/17M/14JF/14 MF/17MF DRILL PRESS Stock No. .JET-6000 FAX[253] 939-8001 #12;OPERATINGINSTRUCTIONS Before operating the unit, please read this manual workpiece. 7. MAINTAIN TOOLS WITH CARE. Keep tools sharp and clean for the best and safest performance

Kleinfeld, David

254

ADJUSTMENT OF STATUS TO PERMANENT RESIDENT Adjustment of Status, filed on form I-485, is your personal application to the U.S. government  

E-Print Network (OSTI)

months in most countries, but can vary must apply in country of birth or legal permanent residence exam and interview overseas must obtain police certificates from every country where applicant

Scharer, John E.

255

Operability and Emissions from a Medium-Duty Fleet Operating...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operability and Emissions from a Medium-Duty Fleet Operating with GTL Fuel and Catalyzed DPFs Operability and Emissions from a Medium-Duty Fleet Operating with GTL Fuel and...

256

Application to Occupy or Perform Operations Upon a State Highway | Open  

Open Energy Info (EERE)

Occupy or Perform Operations Upon a State Highway Occupy or Perform Operations Upon a State Highway Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Application to Occupy or Perform Operations Upon a State Highway Details Activities (0) Areas (0) Regions (0) Abstract: Unavailable Author(s): Unknown Published: Publisher Unknown, Date Unknown Document Number: Unavailable DOI: Unavailable Source: View Original Document Retrieved from "http://en.openei.org/w/index.php?title=Application_to_Occupy_or_Perform_Operations_Upon_a_State_Highway&oldid=675630" Category: Reference Materials What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863281925

257

EA-1364: Proposed Construction and Operation of a Biosafety Level 3  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

364: Proposed Construction and Operation of a Biosafety Level 3 364: Proposed Construction and Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM EA-1364: Proposed Construction and Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM SUMMARY This EA evaluates the potential environmental impacts of a proposal to construct an approximately 3,000 square foot, one-story permanent facility which includes two BSL-3 laboratories with adjoining individual mechanical rooms separated by a central support BSL-2 laboratory; clothes-change and shower rooms; and associated office spaces. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 26, 2002 EA-1364: Final Environmental Assessment Proposed Construction and Operation of a Biosafety Level 3 Facility at Los

258

Operations Research Analysts  

U.S. Energy Information Administration (EIA) Indexed Site

Operations Research Analysts Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or more of the following important functions: * Develop, design, perform, and document a broad range of analyses and studies involving current and projected energy pricing, production, supply, and distribution, and consumption * Using computer programming skills and knowledge of energy industries and markets, designs and develops math-

259

Field Operations Program  

NLE Websites -- All DOE Office Websites (Extended Search)

688 688 May 1999 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort D. V. O'Hara L. A. Slezak DOE/ID-10688 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort 1 D. V. O'Hara 2 L. A. Slezak 2 Published May 1999 Idaho National Engineering and Environmental Laboratory Automotive Systems and Technology Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Idaho Operations Office 1 INEEL/Lockheed Martin Idaho Technologies Co. 2 U.S. Department of Energy iii EXECUTIVE SUMMARY The Field Operations Program is an electric vehicle testing and evaluation program sponsored by U.S. Department of Energy and managed by the Idaho National Engineering and Environmental

260

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Operations Research Analyst  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as an Operations Research Analyst assigned to CEPE, in Washington, DC and is responsible for conducting independent cost and schedule estimates of...

262

Oak Ridge Operations.  

Office of Legacy Management (LM)

4s - 22 Department of Energy Oak Ridge Operations. SI9J>liB P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director...

263

Operating Oak Ridge's "Calutrons"  

NLE Websites -- All DOE Office Websites (Extended Search)

RIDGE'S CALUTRONS: In this oral history, Theodore Rockwell talks about the Y-12 plant at Oak Ridge where the calutrons were operated by young women, many just out of high school....

264

Oak Ridge Operations YTO  

Office of Legacy Management (LM)

ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I - CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a...

265

Protection Program Operations  

Directives, Delegations, and Requirements

This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

2014-10-14T23:59:59.000Z

266

Operations Security Program  

Directives, Delegations, and Requirements

To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

1992-04-30T23:59:59.000Z

267

Operations and Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

268

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

269

CH Packaging Operations Manual  

SciTech Connect

This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

Washington TRU Solutions LLC

2005-06-13T23:59:59.000Z

270

Cogeneration Operational Issues  

E-Print Network (OSTI)

important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation...

Williams, M.

271

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

adverse impacts 40 CFR 1508.27 (b)(l): The selected action establishes a capability to conduct outdoor linac operations at higher power and greater standoff distances. The SOX...

272

Crane Operation Training  

NLE Websites -- All DOE Office Websites (Extended Search)

remove power from the crane and inform the facility management or CAMD safety. Place a lockout tag on the remote control unit. All CAMD crane operations are conducted using the...

273

Plant Operations Executive Director  

E-Print Network (OSTI)

Campus North Campus Recycling Operations Materials Human Resources Payroll Misc Svs Special Projects Planning Spray Shop Glass Shop Upholstery Shop Plant IT Painting Services G. Weincouff Human Resources Business Services Estimating Shutdown Coordination Scheduling L. Rastique Human Resources 67398 M

Awtar, Shorya

274

Corporate Operating Experience Program  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

275

Essays on Retail Operations  

E-Print Network (OSTI)

-fraction and all-or-none inspection. We further perform a case study to identify deficiencies of store operating practices given different risk preferences. Our findings provide practical guidelines for managers to design cost-efficient inspection policy...

Chuang, Hao-Chun

2013-03-12T23:59:59.000Z

276

Transmission and Storage Operations  

Energy Savers (EERE)

to see minimal to none in static or dynamic mode) - Rates are dependent on size, mechanical wear and operating pressures * PM * PdM 5 Methane Release Reduction Can the gas be...

277

Development of Operation System  

Science Journals Connector (OSTI)

We are gradually developing a total hospital information system known as GUNMAS (Gunma University Network for Medical-Hospital- Information Archiving System). an operation system is also being developed as part o...

Seiji Kato M.D.; Yasuharu Kitani M.D.…

1992-01-01T23:59:59.000Z

278

Pipeline operation and safety  

SciTech Connect

Safety is central to the prosperity of the pipeline industry and the need to maintain high standards of the safety at all times is of paramount importance. Therefore, a primary concern of pipeline operator is adequate supervision and the control of the operation of pipelines. Clearly defined codes of practice, standards and maintenance schedules are necessary if protection is to be afforded to the pipeline system employees, the public at large, and the environment.

Tadors, M.K. [Petroleum Pipelines Co., Cairo (Egypt)

1996-12-31T23:59:59.000Z

279

Investigation of coercivity mechanism in hot deformed Nd-Fe-B permanent magnets by small-angle neutron scattering  

SciTech Connect

The magnetic reversal behaviors of single domain sized Nd-Fe-B permanent magnets, with and without isolation between the Nd{sub 2}Fe{sub 14}B grains, was clarified using small-angle neutron scattering (SANS). The SANS patterns obtained arose from changes in the magnetic domains and were analyzed using the Teubner–Stray model, a phenomenological correlation length model, to quantify the periodicity and morphology of the magnetic domains. The results indicated that the magnetic reversal evolved with the magnetic domains that had similar sized grains. The grain isolation enabled us to realize the reversals of single domains.

Yano, M., E-mail: masao-yano-aa@mail.toyota.co.jp; Manabe, A.; Shoji, T.; Kato, A. [Advanced Material Engineering Division, Toyota Motor Corporation, Susono 410-1193 (Japan); Ono, K. [High Energy Accelerator Research Organization (KEK), Tsukuba 305-0801 (Japan); Harada, M. [Toyota Central R and D Labs, Inc., Aichi 480-1192 (Japan); Kohlbrecher, J. [Laboratory for Neutron Scattering, Paul Scherrer Institut, 5232 Villigen PSI (Switzerland)

2014-05-07T23:59:59.000Z

280

Comparison of lead levels in human permanent teeth from Strasbourg, Mexico City, and rural zones of Alsace  

SciTech Connect

A comparative study of the mean lead concentrations in enamel and dentin of human premolars and permanent molars was conducted by means of a systematic sampling procedure with energy-dispersive x-ray fluorescence analysis. In a first series of analyses, no significant statistical differences in mean lead concentrations at various levels of enamel and dentin were noted between young patients of Strasbourg and those of small villages of Alsace, nor between elderly patients living in these two locations, despite the fact that motor traffic was significantly lower in the rural zones. However, in both locations, a significantly higher concentration of lead was observed in enamel and dentin in relation to age. In a second series of analyses, the mean lead concentrations of both dental hard tissues of premolars and permanent molars of young individuals from Strasbourg, rural Alsace, and Mexico City were compared. Significantly higher mean lead concentrations were found in enamel and dentin samples from Mexico City. This was most evident for inner coronal dentin (5.7 and 6.1 times greater than in teeth of Strasbourg and rural zones of Alsace, respectively) and for pulpal root dentin (6.9 and 8.9 times greater than in teeth of Strasbourg and rural zones of Alsace). It is proposed that the higher lead concentrations are related to the higher lead content of motor gasoline and to more intense traffic conditions. The dental hard tissues appear to be of value for the study of environmental lead pollution.

Frank, R.M.; Sargentini-Maier, M.L.; Turlot, J.C.; Leroy, M.J. (Univ. Louis Pasteur, Strasbourg (France))

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Operations Information for Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Information for Studies Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP total customer loads for Fiscal Year 2009 (Oct, 2008-Sept, 2009) FY2010 Load Information (pdf) SLIP total customer loads for Fiscal Year 2010 (Oct, 2009-Sept, 2010) FY2011 Load Information (pdf) SLIP total customer loads for Fiscal Year 2011 (Oct, 2010-Sept, 2011) FY2012 Load Information (pdf) SLIP total customer loads for Fiscal Year 2012 (Oct, 2011-Sept, 2012) FY2013 Load Information (pdf) SLIP total customer loads for Fiscal Year 2013 (Oct, 2012-Sept, 2013) CRSP Projected Power Releases From USBR (Excel) The most recent file of projected future power releases from CRSP Dams, median projection

282

Storage Ring Operation Modes  

NLE Websites -- All DOE Office Websites (Extended Search)

Longitudinal bunch profile and Up: APS Storage Ring Parameters Longitudinal bunch profile and Up: APS Storage Ring Parameters Previous: Source Parameter Table Storage Ring Operation Modes Standard Operating Mode, top-up Fill pattern: 102 mA in 24 singlets (single bunches) with a nominal current of 4.25 mA and a spacing of 153 nanoseconds between singlets. Lattice configuration: Low emittance lattice with effective emittance of 3.1 nm-rad and coupling of 1%. Bunch length (rms): 33.5 ps. Refill schedule: Continuous top-up with single injection pulses occurring at a minimum of two minute intervals, or a multiple of two minute intervals. Special Operating Mode - 324 bunches, non top-up Fill pattern: 102 mA in 324 uniformly spaced singlets with a nominal single bunch current of 0.31 mA and a spacing of 11.37 nanoseconds between singlets.

283

Safe Chain Saw Operation.  

E-Print Network (OSTI)

Z TA24S.7 8873 NO.1409 B-1409 SAFE CHAIN SAW OPERATION Gary S. Nelson* A chain saw is a portable power cutting machine. Used properly, it will trim or cut down trees, clear land or cut fireplace wood. Improperly used, a chain saw can... ground level , losing balance, shifting chain saw weight while cutting at or above waist level or ex periencing chain saw kickback. Often, loss of balance causes an operator to reach into the running saw blade as he grabs to steady himself. Other...

Nelson, Gary S.

1982-01-01T23:59:59.000Z

284

Updated July 2009 Operations Organization  

E-Print Network (OSTI)

All-Hands, Brown Bags, and COO Open-Door sessions Ongoing Conduct Operations Employee Climate SurveysOperations Strategic Plan Updated July 2009 #12;Operations Organization Chief Operating Officer deliver exceptional operational services in support of the scientific mission of Berkeley Lab. goals

Eisen, Michael

285

Hoyte Phifer Facilities Operations  

E-Print Network (OSTI)

battery operated clocks in offices. #12;#12;·Last year, UNCG produced over 1973 tons of solid waste. · 1. , corner of Highland Ave. and Oakland ­ red brick building #12;#12; "All State agencies, universities, and community colleges that have State-owned vehicle fleets shall develop and implement plans to improve

Saidak, Filip

286

Concept of Operations: Essence  

SciTech Connect

This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

Hutton, William J.

2014-04-01T23:59:59.000Z

287

Conduct of Operations  

Directives, Delegations, and Requirements

This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 2, dated 12-3-14, cancels Admin Chg 1.

2010-06-29T23:59:59.000Z

288

RUNWAY OPERATIONAL QUALITY ASSURANCE  

E-Print Network (OSTI)

RUNWAY OPERATIONAL QUALITY ASSURANCE MELANIE BAKER, DARIC MEGERSA & ALFONSO PANLILIO Sponsors: Dr Vortex Separation Rule, for a homogeneous fleet mix, is determined by the time between arriving aircraft Occupancy (SRO) rule, for a non- homogeneous fleet mix, MTC= 3600/ [ROT] [ROT]= = i (pi *ROTi) ROT (in sec

289

Emergency Operations Training Academy | National Nuclear Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

Emergency Operations Training Academy Emergency Operations Training Academy Emergency Operations Training Academy The Office of Emergency Operations, NA-40-The Emergency Operations...

290

CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations - Y-12 Enriched Uranium Operations Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January, 2005 assessment of Conduct of Operations program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility More Documents & Publications CRAD, DOE Oversight - Y-12 Enriched Uranium Operations Oxide Conversion

291

Recovery Act Begins Box Remediation Operations at F Canyon | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon May 17, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Paivi Nettamo, SRNS (803) 646-6075 paivi.nettamo@srs.gov AIKEN, S.C. - The F Canyon box remediation program, an American Recovery and Reinvestment Act project at Savannah River Site (SRS), has come online to process legacy transuranic (TRU) waste for off-site shipment and permanent disposal at the Waste Isolation Pilot Plant (WIPP), a geological repository in New Mexico. The $40-million facility will process approximately 330 boxes containing TRU waste with a radiological risk higher than seen in the rest of the Site's original 5,000-cubic-meter

292

Cable Measuring Engine Operation Procedures  

E-Print Network (OSTI)

MEASURING ENGINE OPERATION PROCEDURES LBNL-40565 SC-MAG-597MEASURING ENGINE OPERATION PROCEDURES INDEX IN T ROD U C TCALIBRATION PROCEDURE . .

Authors, Various

2011-01-01T23:59:59.000Z

293

Operations and Maintenance Program Structure  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

294

On Generalizing Pawlak Approximation Operators  

E-Print Network (OSTI)

}. One may interpret i, c : 2U - 2U as unary set-theoretic operators [8, 15]. They are dual operator

Yao, Yiyu

295

Chapter 1: Operating System Models 1 Operating System Models  

E-Print Network (OSTI)

Chapter 1: Operating System Models 1 2 Operating System Models 2.1 Introduction Over the past several years, a number of trends affecting operating system design are witnessed and foremost among them is a move towards modularity. Operating systems such as Microsofts Windows, IBMs OS/2, C-DACs PARAS

Melbourne, University of

296

Operator Standpoint-Based Remote Operation System Considering the Operational Convenience for a Mobile Robot  

Science Journals Connector (OSTI)

The remotely operated mobile robot is usually controlled in the viewpoint of the mobile robot using the conventional remote operation system. However, it is a little hard ... , we propose the operator standpoint-...

Chang-Seop Shin; Gon-Woo Kim

2013-01-01T23:59:59.000Z

297

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

298

Nevada Operations Office  

Office of Legacy Management (LM)

Nevada Operations Office Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified as the location of the subject liquid wastes. Numerous readings were made with a hand-held Ludlum Model 125 Micro-R meter, for the purpose of personnel radiation protection walking into the controlled, posted radioactive waste compounds. No readings were above background.

299

User Operation Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS-NSSD-TOF-TD-0002 - R00 SNS-NSSD-TOF-TD-0002 - R00 1 SEQUOIA Operations Manual for Users G.E. Granroth SEQUOIA Lead Instrument Scientist A.I. Kolesnikov SEQUOIA Instrument Scientist L.M. DeBeer-Schmitt SEQUOIA Scientific Associate T.E. Sherline Sample Environment Scientist Revised - May 13, 2013 SNS-NSSD-TOF-TD-0002 - R00 2 Abstract The SEQUOIA Operations Manual for Users presents a description of the SEQUOIA spectrometer located at beamline 17 (BL17) of the Spallation Neutron Source (SNS). It is the intent of this manual to inform the user regarding the SEQUOIA spectrometer and available sample environment, to run experiments, to access and analyze the collected data, and to provide the user with other potentially useful information. The first section serves to describe the components of which the instrument is comprised.

300

DCO Operations Interesting Statistics  

E-Print Network (OSTI)

DCO Operations Interesting Statistics 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Chart by: HANDS DOWN SOFTWARE, www.handsdownsoftware.com 1.00 0.95 0.90 0.85 0.80 0.75 0.70 0.65 0.60 0 is annotated with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

OPERATOR'S MANUAL IMPORTANT NOTES  

E-Print Network (OSTI)

-3 B) LOAD CONNECTION (I) and PAR. 3-3 C) LOAD CONNECTION (II) add the following: Load connectionsMODEL OPERATOR'S MANUAL IMPORTANT NOTES: 1) This manual is valid for the following Model: BOP 20-20, BOP 36-12, BOP 50-8, BOP 72-6, BOP 100-4 BOP 100W, 200W, 400W POWER SUPPLY #12;#12;1 LOAD

Kleinfeld, David

302

Climate Data Operators (CDO)  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 3/4, GRIB including SZIP compression, EXTRA, SERVICE and IEG are supported as IO-formats. Apart from that cdo can be used to analyse any kind gridded data not related to climate science. CDO has very small memory requirements and can process files larger than the physical memory. How to Use CDO module load cdo cdo [Options] Operators ... Further Information CDO Online Documentation Availability Package Platform Category Version Module Install Date Date Made Default cdo carver libraries/ I/O 1.4.1 cdo/1.4.1 2012-01-13 2012-01-13 cdo carver libraries/ I/O 1.4.6 cdo/1.4.6 2012-05-24 2012-05-25 cdo carver libraries/ I/O 1.6.1 cdo/1.6.1 2013-07-02

303

Elephant butte powerplant investigation of permanent magnet generator corrosion and bearing failures. Project notes 8450-97-07. Technical memo  

SciTech Connect

This investigation and report were initiated in response to a request to determine causes for excessive corrosion and premature bearing failures on the Woodward Permanent Magnet Generator (PMG) on the three main generating units at Elephant Butte. All three main generating units were rewound using epoxy-type insulating materials between 1989 and 1991. Plant personnel reported that corrosion and failure rates seemed to accelerate after the new stator windings were installed. This report documents field testing conducted the week of March 10, 1997, to determine if stray electrical currents/voltages were causing the problems. Electrical field test results indicate that accelerated PMG bearing failure and corrosion were not caused by stray voltages or current. Tests were conducted on the main shaft in the turbine pit and on the PMG shaft and housing located atop the exciter shaft.

Price, P.; Atwater, P.

1997-04-01T23:59:59.000Z

304

Iron-Nickel-Based SuperMagnets: Multiscale Development of L10 Materials for Rare Earth-Free Permanent Magnets  

SciTech Connect

REACT Project: Northeastern University will develop bulk quantities of rare-earth-free permanent magnets with an iron-nickel crystal structure for use in the electric motors of renewable power generators and EVs. These materials could offer magnetic properties that are equivalent to today’s best commercial magnets, but with a significant cost reduction and diminished environmental impact. This iron-nickel crystal structure, which is only found naturally in meteorites and developed over billions of years in space, will be artificially synthesized by the Northeastern University team. Its material structure will be replicated with the assistance of alloying elements introduced to help it achieve superior magnetic properties. The ultimate goal of this project is to demonstrate bulk magnetic properties that can be fabricated at the industrial scale.

None

2012-01-01T23:59:59.000Z

305

Power-Factor Calculation under Consideration of Cross Saturation of the Interior Permanent Magnet Synchronous Motor with Brushless Field Excitation  

SciTech Connect

This paper introduces a new method for calculating the power factor with consideration of the cross saturation between the direct-axis (d-axis) and the quadrature-axis (q-axis) of an interior permanent magnet synchronous motor (IPMSM). The conventional two-axis IPMSM model is modified to include the cross-saturation effect by adding the cross-coupled inductance terms. This paper also contains the new method of calculating the cross-coupled inductance values as well as self-inductance values in d- and q-axes. The analyzed motor is a high-speed brushless field excitation machine that offers high torque per ampere per core length at low speed and weakened flux at high speed, which was developed for the traction motor of a hybrid electric vehicle.

Lee, Seong T [ORNL; Burress, Timothy A [ORNL; Hsu, John S [ORNL

2009-01-01T23:59:59.000Z

306

Ion beams extraction and measurements of plasma parameters on a multi-frequencies microwaves large bore ECRIS with permanent magnets  

SciTech Connect

We have developed an all-permanent magnet large bore electron cyclotron resonance ion source (ECRIS) for broad ion beam processing. The cylindrically comb-shaped magnetic field configuration is adopted for efficient plasma production and good magnetic confinement. To compensate for disadvantages of fixed magnetic configuration, a traveling wave tube amplifier (TWTA) is used. In the comb-shaped ECRIS, it is difficult to achieve controlling ion beam profiles in the whole inside the chamber by using even single frequency-controllable TWTA (11-13GHz), because of large bore size with all-magnets. We have tried controlling profiles of plasma parameters and then those of extracted ion beams by launching two largely different frequencies simultaneously, i.e., multi-frequencies microwaves. Here we report ion beam profiles and corresponding plasma parameters under various experimental conditions, dependence of ion beams against extraction voltages, and influence of different electrode positions on the electron density profile.

Nozaki, Dai; Kiriyama, Ryutaro; Takenaka, Tomoya; Kurisu, Yosuke; Yano, Keisuke; Sato, Fuminobu; Kato, Yushi; Iida, Toshiyuki [Division of Electrical, Electronic and Information Engineering, Graduate School of Engineering, Osaka Univ., 2-1 Yamadaoka, Suita-shi, Osaka, 565-0871 (Japan)

2012-11-06T23:59:59.000Z

307

C:\WINNT\Profiles\caseys\DESKTOP\L T R C\PICs Program\Permanent Markers\PM Test Plan.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

0-3175 0-3175 Permanent Markers Testing Program Plan September 28, 2000 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Area Office Carlsbad, New Mexico Permanent Markers Testing Program Plan Waste Isolation Pilot Plant Carlsbad, New Mexico DOE/WIPP 00-3175 September 28, 2000 DOE/WIPP 00-3175 -i- Table of Contents List of Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 Markers Testing Program Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.0 Markers Systems Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 3.1 Screening Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 3.1.1 Large Surface Markers . . . . . . . . . . . .

308

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

309

Protection Program Operations  

Directives, Delegations, and Requirements

The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Cancels DOE M 470.4-2A, DOE M 470.4-3A, and DOE M 470.4-8. Appendix C Safeguards and Security Alarm Management and Control Systems, of DOE M 470.4-2A, is retained and incorporated into this Order as Attachment 3, Annex 1.

2011-06-29T23:59:59.000Z

310

Microstructual investigation of mixed rar earth iron boron processed vis melt-spinning and high-pressure gas-atomization for isotrophic bonded permanent magnets  

SciTech Connect

A solid solution of three rare earths (RE) in the RE{sub 2}Fe{sub 14}B structure have been combined to create the novel mixed rare earth iron boron (MRE{sub 2}Fe{sub 14}B) alloy family. MRE{sub 2}Fe{sub 14}B exhibits reduced temperature dependent magnetic properties; remanence and coercivity. The desired form of MRE{sub 2}Fe{sub 14}B is a powder that can be blended with a polymer binder and compression or injection molded to form an isotropic polymer bonded permanent magnet (PBM). Commercially, Nd{sub 2}Fe{sub 14}B is the alloy of choice for PBMs. Powders of Nd{sub 2}Fe{sub 14}B are made via melt-spinning as can be MRE{sub 2}Fe{sub 14}B which allows for direct comparisons. MRE{sub 2}Fe{sub 14}B made using melt-spinning at high wheel speeds is overquenched and must be annealed to an optimal hard magnetic state. Due to the rare earth content in the MRE{sub 2}Fe{sub 14}B powders, they must be protected from the environment in which they operate. This protection is accomplished by using a modified fluidized bed process to grow a protective fluoride coating nominally 15nm thick, to reduce air oxidation. MRE{sub 2}Fe{sub 14}B has demonstrated reduced temperature dependent magnetic properties in ribbon and PBM form. The real challenge has been modifying alloy designs that were successfully melt-spun to be compatible with high-pressure gas-atomization (HPGA). The cooling rates in HPGA are lower than melt-spinning, as the powders are quenched via convective cooling, compared to melt-spinning, which quenches initially by conductive cooling. Early alloy designs, in gas atomized and melt-spun form, did not have similar phase compositions or microstructures. Alloy additions, such as the addition of zirconium as a nucleation catalyst, were successful in creating similar phases and microstructures in the HPGA powders and melt-spun ribbon of the same MRE{sub 2}Fe{sub 14}B composition.

Buelow, Nicholas Lee

2005-08-01T23:59:59.000Z

311

Extending quantum operations  

SciTech Connect

For a given set of input-output pairs of quantum states or observables, we ask the question whether there exists a physically implementable transformation that maps each of the inputs to the corresponding output. The physical maps on quantum states are trace-preserving completely positive maps, but we also consider variants of these requirements. We generalize the definition of complete positivity to linear maps defined on arbitrary subspaces, then formulate this notion as a semidefinite program, and relate it by duality to approximative extensions of this map. This gives a characterization of the maps which can be approximated arbitrarily well as the restriction of a map that is completely positive on the whole algebra, also yielding the familiar extension theorems on operator spaces. For quantum channel extensions and extensions by probabilistic operations we obtain semidefinite characterizations, and we also elucidate the special case of Abelian inputs or outputs. Finally, revisiting a theorem by Alberti and Uhlmann, we provide simpler and more widely applicable conditions for certain extension problems on qubits, and by using a semidefinite programming formulation we exhibit counterexamples to seemingly reasonable but false generalizations of the Alberti-Uhlmann theorem.

Heinosaari, Teiko [Turku Centre for Quantum Physics, Department of Physics and Astronomy, University of Turku (Finland); Jivulescu, Maria A. [Department of Mathematics, University Politehnica Timisoara, 300006 Timisoara (Romania); Reeb, David; Wolf, Michael M. [Department of Mathematics, Technische Universitaet Muenchen, 85748 Garching (Germany)

2012-10-15T23:59:59.000Z

312

Physics-Astronomy Library Permanent Reserve Collection -Loan Periods Vary (revised 8/27/2010) AUTHOR TITLE E-BOOK CALL NUMBER  

E-Print Network (OSTI)

Physics-Astronomy Library Permanent Reserve Collection - Loan Periods Vary (revised 8, 3rd ed. QA 931 L283 1986 Shu, F.H. Physical Universe QB 43.2 S54 1982 Chaisson, E., et al Astronomy: A Beginner's Guide to the Universe, 5th ed. QB 43.3 C43 2007 Chaisson, E., et al Astronomy Today, 5th ed. QB

Wurtele, Jonathan

313

Market efficiency and the long-memory of supply and demand: Is price impact variable and permanent or fixed and temporary?  

E-Print Network (OSTI)

Market efficiency and the long-memory of supply and demand: Is price impact variable and permanent vs. seller initiated transactions. For example, during a period where there is an excess of buyer initiated transactions, there is also more liquidity for buy orders than sell orders, so that buy orders

314

Advances in nanostructured permanent magnets research This article has been downloaded from IOPscience. Please scroll down to see the full text article.  

E-Print Network (OSTI)

motors and wind turbine generators using permanent magnets are more energy efficient compared with other/12/2012 at 05:16 Please note that terms and conditions apply. View the table of contents for this issue, or go conditions on interphase exchange interactions are given. Synthesis techniques for hard magnetic

Liu, J. Ping

315

Permanence and periodicity of a delayed ratio-dependent predator-prey model with Holling type functional response and stage structure  

Science Journals Connector (OSTI)

A periodic and delayed ratio-dependent predator-prey system with Holling type III functional response and stage structure for both prey and predator is investigated. It is assumed that immature predator and mature individuals of each species are divided ... Keywords: Periodic solution, Permanence, Ratio-dependence, Stage structure, Time delay

Zuxiong Li; Lansun Chen; Jianmin Huang

2009-11-01T23:59:59.000Z

316

Operation Prognostics and Operation Diagnostics—Technologies for Enhanced Operations and Controls  

E-Print Network (OSTI)

PROGNOSTICS AND OPERATION DIAGNOSTICS ? NEW TECHNOLOGIES FOR ENHANCED OPERATIONS AND CONTROLS OLIVER BAUMANN, PRESIDENT 202-608-1334 EBERT & BAUMANN CONSULTING ENGINEERS, WASHINGTON D.C. The Methodologies of Operation Prognostics and Operation... Diagnostics have been developed by the authors over the last 8 to 10 years. Today, these methodologies have been combined in an integrated approach for advanced building commissioning. Within Operation Diagnostics, advanced visualization techniques...

Baumann, O.

317

Operation Diagnostics: Use of Visualization Techniques and Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Diagnostics: Use of Visualization Techniques and Operation Operation Diagnostics: Use of Visualization Techniques and Operation Patterns to Verify and Optimize Dynamic Building and System Operation Speaker(s): Oliver Baumann Date: December 7, 2004 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Peng Xu Building automation systems (BAS) and building energy management systems (BEMS) have been used in modern edifices for the last 2 decades. These systems measure, process, and monitor a huge amount of data to operate the building and systems more or less properly. Often, the data is only used to signal failures or break-downs of systems or components. Further information of the data to analyze and diagnose the building operation is not used due to the lack of analysis methods and tools. Within the Operation Diagnostics, different visualization techniques are applied to

318

ENERGY CONSUMPTION OF ICT INFRASTRUCTURES: AN OPERATOR’S VIEWPOINT  

Science Journals Connector (OSTI)

Abstract (40-Word Limit): The digital revolution has resulted up to now in the need for increasingly powerful and energy-hungry infrastructures. We give an operator’s viewpoint...

Gosselin, Stéphane W; Saliou, Fabienne; Bourgart, Fabrice; Le Rouzic, Esther; Le Masson, Stéphane; Gati, Azeddine

319

Jordan cohomology for operator algebras Great Plains Operator Theory Symposium  

E-Print Network (OSTI)

Jordan cohomology for operator algebras Great Plains Operator Theory Symposium Kansas State) Jordan cohomology for operator algebras 1 / 23 #12;Outline · Jordan Derivations · Jordan Weak*-Amenability · Jordan 2-cocycles NOTE: Jordan can mean Jordan algebra or Jordan triple (depending on my fancy) Bernard

Russo, Bernard

320

TYPE OF OPERATION  

Office of Legacy Management (LM)

Owner c:ontacted Owner c:ontacted TYPE OF OPERATION ----------------_ jJ Research & Development 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process i Theoretical Studies Sample & Analysis B Production 0 Disposal/Storage $r Prime 0 Subcontract& 0 Purchase Order 0 Facility Type 0 Manufacturing 0 University 0 Research Organization a Other information (i.e., cost + fixed fern, unit price,' time & mate ~r~~-r~~tf~-_~_-_~-~f-~~J~ d ial, etc)_kl/Jlfits ---- -7---- -- Contract/Purchase Order # w?@7-e?-b $ 6, i;,_~~~~~----------------- - ----- C_O!!IF!KXYE-PEELEg: -lTlL-/L?~J --------------------------- OWNERSHXP: AEWHEC AEC/HED' GOVT GB' JT SiXiRACTOR CONiRkCiGR WEE LEAs_EE a!!!%? IEEE!? --------_ ..---LEASED ._ OWNED LANDS BUILDINGS EQUIPMENT

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

TYPE OF OPERATION  

Office of Legacy Management (LM)

OWNEF? (S) OWNEF? (S) Current: ____ LcrcJksLG! _________ Owner contacted n yes WI-IO; if yes, date contacted-- TYPE OF OPERATION ----_-------_---- m Research & Development Cl Pilot Scale Cl Disposal/Storaqe TYPE OF CDNTRACT ---__------__--- q Prime 0 Subcnntractor Cl Purchase Order 0 Other infcrmation (i.e., cnst + fixed fee, unit price, time 84 materi+, e.tc) v-7Y07-&G-W ---------------------------- Contract/Pur&aae Order # 0 -?+7- FJc-(CL --___--------~----_______________ CONTRACTING PEXIOD: fl& ,&I;'"'-?;': (&e-?)_-- ' ------------------ OWNERSHIP: AEC/MED GEC/MED SOVT GOVT CONTRACTOR CCNTRACTOR OWNE3 LEASE3 OWNE3 LEASED OWNE3 ----- ------ ----- ------ -__------- LE.352 LANDS u u q BUILDINGS EQUIPMENT 0 FINAL PRODUCT WASTE G RESIDUE a

322

TYPE OF OPERATION  

Office of Legacy Management (LM)

3!NEEi_S1 3!NEEi_S1 past: -~~~-~~~~~-~~~---------- current: ------------_------------- Owner contacted q yes g no; if ye=, date contacted TYPE OF OPERATION --~~__--~-~~~---- 5 Research & Development 5 Facility Type 0 Production scale testing c1 Pilot Scale 0 Bench Scale Process z Theareti cal Studi es Sample Sr Analysis 0 Production D Disposal/Storage TYPE OF CONTRACT ---------------- 0 Manufacturing 0 University 0 Research Clrganization B Government Cpanaored Faci 1 i ty 0 Other ~~---~~---_--~~-----_ a Prime 13 Subcontract& D PurcSase Order 0 Other information (i.e., cost + fixed fee, unit price, time & material, +z) ----_----------------------- Cantract/Purchaae Order #-d-z=&-/) -2_7~-------------Is_------------ PERIOD: CONTRACTING I%~(?) - 1465

323

Albuquerque Operations Office  

Office of Legacy Management (LM)

%r © J~4 %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from inactive uranium mill sites. Evaluation of your property identified above has revealed the presence of residual radioactive material in excess of standards established by the Environmental Protection Agency (EPA). Therefore, your property has been formally included by DOE for remedial action in the Uranium Mill Tailings

324

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

325

RH Packaging Operations Manual  

SciTech Connect

This procedure provides operating instructions for the RH-TRU 72-B Road Cask, Waste Shipping Package. In this document, ''Packaging'' refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). ''Package'' refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Loading of the RH 72-B cask can be done two ways, on the RH cask trailer in the vertical position or by removing the cask from the trailer and loading it in a facility designed for remote-handling (RH). Before loading the 72-B cask, loading procedures and changes to the loading procedures for the 72-B cask must be sent to CBFO at sitedocuments@wipp.ws for approval.

Washington TRU Solutions LLC

2003-09-17T23:59:59.000Z

326

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 1 Safety Solutions and Pollution Prevention Proposals Congratulations to Barbara Roland of the Nonproliferation and National Security Dept.! Barbara's Safety Solution proposal has been funded. To improve personnel safety in Building 197 during emergency situations, she suggested that pathway markers be positioned on the hallway walls to help locate the Indoor Assembly Areas and Evacuation routes. Light mo- tion detectors for "common areas" in several of our buildings was also funded. This idea sprung from a suggestion received during our Director- ate Safety Stand Down in 2009. This will improve safety and conserve energy too. Remember to send us your suggestions for next year!

327

Operational Security (OPSEC) Reminder | Department of Energy  

Office of Environmental Management (EM)

Operational Security (OPSEC) Reminder Operational Security (OPSEC) Reminder June 3, 2014 - 1:24pm Addthis Operational Security (OPSEC) Reminder Operational Security (OPSEC)...

328

Symmetry of the Riemann Operator  

E-Print Network (OSTI)

Chaos quantization conditions, which relate the eigenvalues of a Hermitian operator (the Riemann operator) with the non-trivial zeros of the Riemann zeta function are considered, and their geometrical interpretation is discussed.

B. Aneva

2008-04-10T23:59:59.000Z

329

CONTRACTS AND PROCUREMENT OPERATIONS MANUAL  

E-Print Network (OSTI)

CONTRACTS AND PROCUREMENT OPERATIONS MANUAL California State University, Fullerton Division University, Fullerton Contracts and Procurement P a g e | 1 Table of Contents ALPHABETICAL INDEX OF TERMS.........................................................................................................................14 CONTRACTS AND PROCUREMENT OPERATIONS

de Lijser, Peter

330

DOE Corporate Operating Experience Program  

Directives, Delegations, and Requirements

The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Cancels DOE O 210.2.

2011-04-08T23:59:59.000Z

331

Idle Operating Total Stream Day  

U.S. Energy Information Administration (EIA) Indexed Site

3 3 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 11 10 1 1,293,200 1,265,200 28,000 1,361,700 1,329,700 32,000 ............................................................................................................................................... PAD District I 1 1 0 182,200 182,200 0 190,200 190,200 0 ................................................................................................................................................................................................................................................................................................ Delaware......................................

332

DOE, Invensys Operations Management to Develop, Deploy Operator Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, Invensys Operations Management to Develop, Deploy Operator DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants December 10, 2012 - 12:00pm Addthis Washington, DC - A new U.S. Department of Energy (DOE) cooperative research and development agreement to develop, test, and deploy a dynamic simulator and operator training system (OTS) could eventually help commercialize important carbon capture technologies at the nation's power plants. The high-fidelity, real-time OTS for a generic supercritical once-through (SCOT) pulverized-coal power plant will be installed at the National Energy Technology Laboratory's (NETL's) Advanced Virtual Energy Simulation

333

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

334

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

335

Operating Reserves and Variable Generation  

SciTech Connect

This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

Ela, E.; Milligan, M.; Kirby, B.

2011-08-01T23:59:59.000Z

336

OPERATING SYSTEM CONCEPTS Avi Silberschatz  

E-Print Network (OSTI)

OPERATING SYSTEM CONCEPTS Avi Silberschatz Department of Computer Sciences University of Texas & Peter Galvin CHAPTER 1: INTRODUCTION . What is an operating system? . Early Systems . Simple Batch Systems . Distributed Systems . Real­Time Systems Operating System Concepts, Addison­Wesley � 1994

Schmidt, Douglas C.

337

Network Operating Systems Partha Dasgupta  

E-Print Network (OSTI)

Network Operating Systems Partha Dasgupta Department of Computer Science and Engineering Arizona of Electrical Engineering] 1. Introduction Network Operating Systems extend the facilities and services provided by computer operating systems to support a set of computers, connected by a network. The environment managed

Dasgupta, Partha

338

LCLS Operating Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

339

The influence of microstructure on magnetic properties of nanocrystalline Fe-Pt-Nb-B permanent magnet ribbons  

SciTech Connect

A FePt-based hard-magnetic nanocomposite of exchange spring type was prepared by isothermal annealing of melt-spun Fe{sub 52}Pt{sub 28}Nb{sub 2}B{sub 18} (atomic percent) ribbons. The relationship between microstructure and magnetic properties was investigated by qualitative and quantitative structural analysis based on the x-ray diffraction, transmission electron microscopy, and {sup 57}Fe Moessbauer spectrometry on one hand and the superconducting quantum interference device magnetometry on the other hand. The microstructure consists of L1{sub 0}-FePt hard-magnetic grains (15-45 nm in diameter) dispersed in a soft magnetic medium composed by A1 FePt, Fe{sub 2}B, and boron-rich (FeB)PtNb remainder phase. The ribbons annealed at 700 deg. C for 1 h exhibit promising hard-magnetic properties at room temperature: M{sub r}/M{sub s}=0.69; H{sub c}=820 kA/m and (BH){sub max}=70 kJ/m{sup 3}. Strong exchange coupling between hard and soft magnetic phases was demonstrated by a smooth demagnetizing curve and positive {delta}M-peak in the Henkel plot. The magnetic properties measured from 5 to 750 K reveals that the hard characteristics remains rather stable up to 550 K, indicating a good prospect for the use of these permanent magnets in a wide temperature range.

Randrianantoandro, N.; Greneche, J. M. [Laboratoire de Physique de l'Etat Condense, UMR CNRS 6087, Universite du Maine, 72085 Le Mans cedex 9 (France); Crisan, A. D. [Laboratoire de Physique de l'Etat Condense, UMR CNRS 6087, Universite du Maine, 72085 Le Mans cedex 9 (France); National Institute for Materials Physics, P.O. Box MG-7, 76900 Bucharest (Romania); Crisan, O. [National Institute for Materials Physics, P.O. Box MG-7, 76900 Bucharest (Romania); Marcin, J.; Kovac, J.; Hanko, J.; Skorvanek, I. [Institute of Experimental Physics, Slovak Academy of Sciences, 043 53 Kosice (Slovakia); Svec, P. [Institute of Physics, SAS, Dubravska cesta 9, 84228 Bratislava (Slovakia); Chrobak, A. [August Chelkowski Institute of Physics, University of Silesia, 40-007 Katowice (Poland)

2010-11-15T23:59:59.000Z

340

Results from a prototype permanent magnet dipole-quadrupole hybrid for the PEP-II B-factory  

SciTech Connect

We describe the construction of a prototype hybrid permanent magnet dipole and quadrupole. The magnet consists of two concentric rings of Sm{sub 2}Co{sub 17} magnetic material 5 cm in length. The outer ring is made of 16 uniformly magnetized blocks assembled as a Halbach dipole and the inner ring has 32 blocks oriented in a similar fashion so as to generate a quadrupole field. The resultant superimposed field is an offset quadrupole field which allows us to center the field on the high-energy beam in the interaction region of the PEP-II B-factory. The dipole blocks are glued to the inside surface of an outer support collar and the quadrupole blocks are held in a fixture that allows radial adjustment of the blocks prior to potting the entire assembly with epoxy. An extensive computer model of the magnet has been made and from this model we developed a tuning algorithm that allowed us to greatly reduce the n=3 17 harmonics of the magnet.

Sullivan, M.; Bowden, G.; Ecklund, S. [and others

1997-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

On-the-fly machine-learning for high-throughput experiments: search for rare-earth-free permanent magnets  

SciTech Connect

Advanced materials characterization techniques with ever-growing data acquisition speed and storage capabilities represent a challenge in modern materials science, and new procedures to quickly assess and analyze the data are needed. Machine learning approaches are effective in reducing the complexity of data and rapidly homing in on the underlying trend in multi-dimensional data. Here, we show that by employing an algorithm called the mean shift theory to a large amount of diffraction data in high-throughput experimentation, one can streamline the process of delineating the structural evolution across compositional variations mapped on combinatorial libraries with minimal computational cost. Data collected at a synchrotron beamline are analyzed on the fly, and by integrating experimental data with the inorganic crystal structure database (ICSD), we can substantially enhance the accuracy in classifying the structural phases across ternary phase spaces. We have used this approach to identify a novel magnetic phase with enhanced magnetic anisotropy which is a candidate for rare-earth free permanent magnet.

Kusne, Aaron Gilad [University of Maryland; Gao, Tieren [University of Maryland; Mehta, Apurva [SLAC National Accelerator Laboratory; Ke, Liqin [Ames Laboratory; Nguyen, Manh Cuong [Ames Laboratory; Ho, Kai-Ming [Ames Laboratory; Antropov, Vladimir [Ames Laboratory; Wang, Cai-Zhuang [Ames Laboratory; Kramer, Matthew J [Ames Laboratory; Long, Christian [University of Maryland; Takeuchi, Ichiro [University of Maryland

2014-09-15T23:59:59.000Z

342

Study of Various Slanted Air-Gap Structures of Interior Permanent Magnet Synchronous Motor with Brushless Field Excitation  

SciTech Connect

This paper shows how to maximize the effect of the slanted air-gap structure of an interior permanent magnet synchronous motor with brushless field excitation (BFE) for application in a hybrid electric vehicle. The BFE structure offers high torque density at low speed and weakened flux at high speed. The unique slanted air-gap is intended to increase the output torque of the machine as well as to maximize the ratio of the back-emf of a machine that is controllable by BFE. This irregularly shaped air-gap makes a flux barrier along the d-axis flux path and decreases the d-axis inductance; as a result, the reluctance torque of the machine is much higher than a uniform air-gap machine, and so is the output torque. Also, the machine achieves a higher ratio of the magnitude of controllable back-emf. The determination of the slanted shape was performed by using magnetic equivalent circuit analysis and finite element analysis (FEA).

Tolbert, Leon M [ORNL; Lee, Seong T [ORNL

2010-01-01T23:59:59.000Z

343

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

October, 2011 October, 2011 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 2 October is National Fire Safety Month Did you know that Fire Prevention Week was established to commemorate the Great Chicago Fire, the tragic 1871 conflagration that killed more than 250 people, left 100,000 homeless, destroyed more than 17,400 structures and burned more than 2,000 acres. The fire began on October 8, but continued into and did most of its damage on October 9, 1871. According to popular legend, the fire broke out after a cow - belonging to Mrs. Catherine O'Leary - kicked over a lamp, setting first the barn, then the whole city on fire. While the Great Chicago Fire was the best-known blaze to start during this fiery two-day stretch,

344

Drilling operations change gear  

SciTech Connect

Predicts that several technological developments (e.g. measurement-while-drilling tools, computer data-gathering systems, improved drill bits, muds, downhole mud motors, and more efficient rigs) will have a major effect on drilling operations in the not-too-distant future. While several companies manufacture MWD systems and most can boast of successful runs, the major problem with the MWD system is cost. Manufacturers continue to make advances in both turbine and positive displacement mud motors. As the life span of downhole mud motors improves, these motors can economically compete with a rotary rig in drilling certain straight-hole intervals. Prototype bit designs include the use of lasers, electronic beams, flames, sparks, explosives, rocket exhaust, chains, projectiles, abrasive jets, and high-pressure erosion. Because drilling fluids are taking a large share of the drilling budget, mud engineers are trying to optimize costs, while maintaining well bore stability and increasing penetration rates. Many companies are taking the strategy of designing the simplest mud program possible and increasing additives only as needed. Air and foam drilling techniques are gaining attention. Concludes that as crude oil prices increase and the rig count begins to rebound, attention will once again turn to drilling technology and methodology.

Moore, S.D.

1982-08-01T23:59:59.000Z

345

Operations | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

346

Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

347

Operations & Maintenance Best Practices Guide: Chapter 3  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

348

Liens for Oil and Gas Operations (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

This section contains regulations concerning lien allowances made to operators of oil and gas operations.

349

Riser and wellhead monitoring for improved offshore drilling operations  

E-Print Network (OSTI)

in mind during riser operations. Safe operation... ...deals with conduction the operation within operation

Nørvåg, Kjetil

350

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating  

NLE Websites -- All DOE Office Websites (Extended Search)

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Costs and Societal Environmental Issues Speaker(s): Don Aumann Date: March 21, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Satkartar K. Kinney Don Aumann, a Senior Consultant from BKi in Oakland, will present an overview of two projects he completed for the electric utility industry. The first, a case study evaluation of a hybrid chiller plant in Jefferson City, Missouri, demonstrates the importance of carefully evaluating the impact of utility rate structures on plant operating costs. The building owner, another engineering consultant, and the local utility representatives were confused by the rates and missed an opportunity to cut chiller-plant operating costs by about 20%, totaling $15,000 per year. In

351

Manhattan Project: Hanford Becomes Operational, 1943-1944  

Office of Scientific and Technical Information (OSTI)

F Reactor Plutonium Production Complex at Hanford, 1945 HANFORD BECOMES OPERATIONAL F Reactor Plutonium Production Complex at Hanford, 1945 HANFORD BECOMES OPERATIONAL (Hanford Engineer Works, 1943-1944) Events > The Plutonium Path to the Bomb, 1942-1944 Production Reactor (Pile) Design, 1942 DuPont and Hanford, 1942 CP-1 Goes Critical, December 2, 1942 Seaborg and Plutonium Chemistry, 1942-1944 Final Reactor Design and X-10, 1942-1943 Hanford Becomes Operational, 1943-1944 The plutonium production facilities at the Hanford Engineer Works took shape with the same wartime urgency as did the uranium facilities at Oak Ridge. In February 1943, Colonel Matthias returned to the location he had helped select the previous December and set up a temporary headquarters. In late March, Matthias received his assignment. The three water-cooled production reactor (piles), designated by the letters B, D, and F, would be built about six miles apart on the south bank of the Columbia River. The four chemical separation plants would be built in pairs at two sites nearly ten miles south of the piles. A facility to produce slugs and perform tests would be approximately twenty miles southeast of the separation plants near Richland. Temporary quarters for construction workers would be put up at the Hanford town site, while permanent facilities for other personnel would be located down the road in Richland, safely removed from the production and separation plants. Life at Hanford would soon come to resemble that of the other "atomic boomtowns" of the Manhattan Project, Los Alamos and Oak Ridge.

352

Business Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Operations Business Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of Business Operations - Office of Budget, Office of Business Services, and Office of Information and Business Management - and their managers are outlined in the Business Operations organization chart. Offices Image of the Department of Energy Forrestal building in DC. Office of Budget The Office of Budget provides information that informs policy development and program planning, including basic market and economic data relevant to EERE's programs, market and economic analysis, estimation of the public benefits of EERE's programs, evaluation of past program performance and

353

Permanent prostate implant using high activity seeds and inverse planning with fast simulated annealing algorithm: A 12-year Canadian experience  

SciTech Connect

Purpose: To report outcomes and toxicity of the first Canadian permanent prostate implant program. Methods and Materials: 396 consecutive patients (Gleason {<=}6, initial prostate specific antigen (PSA) {<=}10 and stage T1-T2a disease) were implanted between June 1994 and December 2001. The median follow-up is of 60 months (maximum, 136 months). All patients were planned with fast-simulated annealing inverse planning algorithm with high activity seeds ([gt] 0.76 U). Acute and late toxicity is reported for the first 213 patients using a modified RTOG toxicity scale. The Kaplan-Meier biochemical failure-free survival (bFFS) is reported according to the ASTRO and Houston definitions. Results: The bFFS at 60 months was of 88.5% (90.5%) according to the ASTRO (Houston) definition and, of 91.4% (94.6%) in the low risk group (initial PSA {<=}10 and Gleason {<=}6 and Stage {<=}T2a). Risk factors statistically associated with bFFS were: initial PSA >10, a Gleason score of 7-8, and stage T2b-T3. The mean D90 was of 151 {+-} 36.1 Gy. The mean V100 was of 85.4 {+-} 8.5% with a mean V150 of 60.1 {+-} 12.3%. Overall, the implants were well tolerated. In the first 6 months, 31.5% of the patients were free of genitourinary symptoms (GUs), 12.7% had Grade 3 GUs; 91.6% were free of gastrointestinal symptoms (GIs). After 6 months, 54.0% were GUs free, 1.4% had Grade 3 GUs; 95.8% were GIs free. Conclusion: The inverse planning with fast simulated annealing and high activity seeds gives a 5-year bFFS, which is comparable with the best published series with a low toxicity profile.

Martin, Andre-Guy [Departement de Radio-oncologie, Centre de Recherche en Cancerologie de l'Universite Laval, Quebec (Canada); Roy, Jean [Departement de Radio-oncologie, Centre de Recherche en Cancerologie de l'Universite Laval, Quebec (Canada); Beaulieu, Luc [Departement de Radio-oncologie, Centre de Recherche en Cancerologie de l'Universite Laval, Quebec (Canada); Centre de Recherche de l'Hotel-Dieu de Quebec, L'Hotel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec (CHUQ), Centre de Recherche en Cancerologie de l'Universite Laval, Quebec (Canada); Pouliot, Jean [Radiation Oncology, University of California San Francisco, San Francisco, CA (United States); Harel, Francois [Centre de Recherche de l'Hotel-Dieu de Quebec, L'Hotel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec (CHUQ), Centre de Recherche en Cancerologie de l'Universite Laval, Quebec (Canada); Vigneault, Eric [Departement de Radio-oncologie, Centre de Recherche en Cancerologie de l'Universite Laval, Quebec (Canada)]. E-mail: Eric.Vigneault@chuq.qc.ca

2007-02-01T23:59:59.000Z

354

DOE limited standard: Operations assessments  

SciTech Connect

Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

NONE

1996-05-01T23:59:59.000Z

355

Bohmian Mechanics with Discrete Operators  

E-Print Network (OSTI)

A deterministic Bohmian mechanics for operators with continuous and discrete spectra is presented. Randomness enters only through initial conditions. Operators with discrete spectra are incorporated into Bohmian mechanics by associating with each operator a continuous variable in which a finite range of the continuous variable correspond to the same discrete eigenvalue. In this way Bohmian mechanics can handle the creation and annihilation of particles. Examples are given and generalizations are discussed.

R. A. Hyman; Shane A. Caldwell; Edward Dalton

2004-01-02T23:59:59.000Z

356

FUPWG Purpose, Policies, and Operations  

Energy.gov (U.S. Department of Energy (DOE))

Draft report—last updated July 22, 2010—discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group (FUPWG).

357

AEC and Oak Ridge Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

transitions required was that of moving the center of authority for daily operations from Oak Ridge, splitting the responsibilities and placing segments of control in various other...

358

Variable pressure operation: An assessment  

SciTech Connect

This report summarizes the benefits, drawbacks, and technical issues of variable pressure operation (VPO) retrofit. Under VPO, turbine throttle pressure is reduced at low loads. This operating mode offers several significant advantages for units that cycle or operate at low loads for extended periods. Information used in the report was assembled from published sources, from major equipment manufacturers, and from utilities operating units under VPO in the US, Europe and Japan. The report also contains statistics of VPO use in this country and abroad. Design features of new units using VPO in Europe and Japan are presented to identify potential directions for future US designs incorporating VPO.

Kimel, E.; Kemeny, P.; Bierman, E.; Lagomarsino, J.; Clarke, D. (Burns and Roe, Inc., Oradell, NJ (USA))

1990-03-01T23:59:59.000Z

359

Relational Interpretations of Neighborhood Operators Rough Set Approximation Operators  

E-Print Network (OSTI)

Relational Interpretations of Neighborhood Operators and Rough Set Approximation Operators Y.Y. Yao and rough set approximations using the more familiar notion of binary relations. A special class of neigh sets, partitions, coverings. 1 INTRODUCTION The theory of rough sets is motivated by practical needs

Yao, Yiyu

360

Conduct of Operations, the first line supervisor: The key to implementation  

SciTech Connect

Implementation of US Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities (DOE 1990) requires modification of personal behavior and group culture. Stranded in the middle, between vision and practical application, is the first line supervisor. Conduct of Operations is a mixture of philosophy and application requiring time, resources, and motivated personnel to achieve visible, long lasting, and meaningful improvement in safety, productivity, and accountability. Consistency in training and implementation strategies for all levels of the company is essential to build the team necessary to establish the ideal Conduct of Operations environment. The focus should be on producing change, strengthening supervisor interaction with their direct reports, and making Conduct of Operations implementation permanent. The first line supervisor is the key to successful implementation. To aid the supervisor in smoothing the implementation process the following questions are covered in this report: (1) what lessons have we learned from our experience so far (2) is there a best way to introduce and orchestrate an atmosphere for change using Conduct of Operations principles (3) what are the roles for each participant in this change (4) what are the tools to help in this process and, (5) what will it cost.

Anglesey, S.C.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Conduct of Operations, the first line supervisor: The key to implementation  

SciTech Connect

Implementation of US Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities (DOE 1990) requires modification of personal behavior and group culture. Stranded in the middle, between vision and practical application, is the first line supervisor. Conduct of Operations is a mixture of philosophy and application requiring time, resources, and motivated personnel to achieve visible, long lasting, and meaningful improvement in safety, productivity, and accountability. Consistency in training and implementation strategies for all levels of the company is essential to build the team necessary to establish the ideal Conduct of Operations environment. The focus should be on producing change, strengthening supervisor interaction with their direct reports, and making Conduct of Operations implementation permanent. The first line supervisor is the key to successful implementation. To aid the supervisor in smoothing the implementation process the following questions are covered in this report: (1) what lessons have we learned from our experience so far? (2) is there a best way to introduce and orchestrate an atmosphere for change using Conduct of Operations principles? (3) what are the roles for each participant in this change? (4) what are the tools to help in this process? and, (5) what will it cost.

Anglesey, S.C.

1992-05-01T23:59:59.000Z

362

DOE Corporate Operating Experience Program  

Directives, Delegations, and Requirements

The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

2006-06-12T23:59:59.000Z

363

All Night Study TSU Operations  

E-Print Network (OSTI)

All Night Study TSU Operations Student Engagement Report FY 2012-2013 Mission Statement The purpose. ASI Marketing and ASI Productions conduct promotional activities throughout the program, providing with ASI Marketing and TSU Operations to increase the number of promotional activities and study breaks

de Lijser, Peter

364

Optimization of Wind Turbine Operation  

E-Print Network (OSTI)

inclination angle was about 1°. The spinner anemometer measurements were correlated with wind speed and windOptimization of Wind Turbine Operation by Use of Spinner Anemometer TF Pedersen, NN Sørensen, L Title: Optimization of Wind Turbine Operation by Use of Spinner Anemometer Department: Wind Energy

365

Operating System Resource Burton Smith  

E-Print Network (OSTI)

Operating System Resource Management Burton Smith Technical Fellow Microsoft Corporation #12;Background · Resource Management (RM) is a primary operating system responsibility ­ It lets competing applications share a system · Client RM in particular faces new challenges ­ Increasing numbers of cores

366

Independent Activity Report, Savannah River Operation - June...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification...

367

Operations and Maintenance | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be...

368

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems...

369

AVESTAR® - Training - Gasification Process Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Gasification Process Operations Gasification Process Operations This course is designed as a familiarization course to increase understanding of the gasification with CO2 capture process. During the training, participants will startup and shutdown the simulated unit in an integrated manner and will be exposed to simple and complex unit malfunctions in the control room and in the field. Course objectives are as follows: Introduce trainees to gasification and CO2 capture process systems and major components and how they dynamically interact Familiarize trainees with the Human Machine Interface (HMI) and plant control and how safe and efficient operation of the unit can be affected by plant problems Provide the trainees with hands-on operating experiences in plant operations using the HMI

370

###Operating Principles published 411.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of operating principles with S-system models Yun Lee 1 , Po-Wei Chen 1 , Eberhard O. Voit ⇑ The Wallace H. Coulter Department of Biomedical Engineering, Georgia Tech and Emory University, 313 Ferst Drive, Suite 4103, Atlanta, GA 30332-0535, United States a r t i c l e i n f o Article history: Available online 4 March 2011 Keywords: Biochemical Systems Theory Design principle Heat stress Operating principle S-system Trehalose a b s t r a c t Operating principles address general questions regarding the response dynamics of biological systems as we observe or hypothesize them, in comparison to a priori equally valid alternatives. In analogy to design principles, the question arises: Why are some operating strategies encountered more frequently than others and in what sense might they be superior? It is at this point impossible to study operation prin- ciples in complete generality,

371

Operator Ideals in Lipschitz and Operator Spaces Categories  

E-Print Network (OSTI)

, in [DJT95]. Thus, it is not surprising that the rst published paper on Ribe’s program for maps [FJ09] dealt with their nonlinear generalization. In this paper, J. Farmer and W.B. Johnson [FJ09] de ne Lipschitz p-summing operators between metric spaces... by Farmer and John- son [FJ09]. The second one is the composition theorem also proved by Pietsch in his seminal paper [Pie67] which, in spirit, says that if we take two p-summing operators and combine them via composition we obtain a \\better" operator...

Chavez Dominguez, Javier

2012-10-19T23:59:59.000Z

372

Carbon discrimination, water-use efficiency, nitrogen and phosphorus nutrition of the host / mistletoe pair Eucalyptus behriana F. Muell and Amyema miquelii (Lehm. ex Miq.) Tiegh. at permanently low plant water status in the field  

Science Journals Connector (OSTI)

Under conditions where both plants had permanently low water status, the mistletoe, Amyema miquelii (Lehm. ex Miq.) Tiegh., had lower nitrogen contents in leaf tissue than its host, Eucalyptus behriana F. Muell. ...

Manfred Küppers

1992-11-01T23:59:59.000Z

373

Chapter 9 -Forklift Operations Forklift Operations Safety Rules  

E-Print Network (OSTI)

, or hazardous locations. 19. Operators should not put their fingers, arms, or legs between the uprights that horn, lights, brakes, tires, gas supply, hydraulic lines, etc. are in safe working condition. Employees

374

ORISE: Operations Support and Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

375

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

376

Operating in the Caspian environment  

SciTech Connect

The Azerbaijan International Operating Company (AIOC) is currently developing oil production from three oil fields in the Caspian Sea. The activities are guided by a comprehensive Environmental Management System adopted to the uniqueness of the Caspian and the historical and political situation in Azerbaijan. The paper discusses the challenges of operating in the Caspian region with a focus on local involvement connected to environmental literature data review and environmental impact assessment. Local involvement and training is concluded to be one key to success for operations in an environmental sensitive region like the Caspian.

Kristoffersen, B.; Rogers, L.

1996-11-01T23:59:59.000Z

377

Subsea pipeline operational risk management  

SciTech Connect

Resources used for inspection, maintenance, and repair of a subsea pipeline must be allocated efficiently in order to operate it in the most cost effective manner. Operational risk management aids in resource allocation through the use of risk assessments and cost/benefit analyses. It identifies those areas where attention must be focused in order to reduce risk. When they are identified, a company`s resources (i.e., personnel, equipment, money, and time) can then be used for inspection, maintenance, and/or repair of the pipeline. The results are cost effective risk reduction and pipeline operation with minimum expenditure.

Bell, R.L.; Lanan, G.A.

1996-12-31T23:59:59.000Z

378

Abstract--This paper discusses an optimum design of an ultra high-speed permanent-magnet synchronous motor  

E-Print Network (OSTI)

rather than a centrifugal compressor because of limitation of the operating speed due to the low engine combustion engines. Since the electrically driven supercharger allows to employ the centrifugal compressorW for electrification of the centrifugal-compressor-based supercharger. There are various difficult technical problems

Fujimoto, Hiroshi

379

Site Name : Pedregal permanent station Author : Vigny Site Code :P E D R date : year 2006 month 11 day 21  

E-Print Network (OSTI)

the water reservoir of the Hacienda. MONUMENTATION Brass 12 cm rod (Delmont type) scealed in bed rock with a standard car. ADDITIONAL INFORMATION Operational since 21/11/2006 (day 325 of year 2006) Charger : Mascot power connection : A = 220v from transformeur B = 12v battery #12;PEDR 2/6 Receiver configuration

Vigny, Christophe

380

Operations & Maintenance Best Practices Guide: Chapter 9  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Operations & Maintenance Best Practices Guide: Front Matter  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

382

Operations & Maintenance Best Practices Guide: Appendix c  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

383

Operations & Maintenance Best Practices Guide: Chapter 7  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

384

Operations & Maintenance Best Practices Guide: Chapter 5  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

385

Operations & Maintenance Best Practices Guide: Chapter 8  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

386

Operations & Maintenance Best Practices Guide: Chapter 10  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

387

Operations & Maintenance Best Practices Guide: Chapter 6  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

388

Operations & Maintenance Best Practices Guide: Appendix a  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

389

Operational Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Management Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Office of Aviation Management U.S. Department of Energy, MA-30 1000 Independence Ave., SW Washington, DC 20585 Glen Wattman Director 202-586-5532 Glen.Wattman@hq.doe.gov Office of Administration U.S. Department of Energy, MA-40 1000 Independence Ave., SW Washington, DC 20585 Peter O'Konski Director 202-586-5710 peter.o'konski@hq.doe.gov Rebecca Montoya Deputy Director 202-586-0610 rebecca.montoya@hq.doe.gov Office of Engineering and Construction Management U.S. Department of Energy, MA-50

390

AUTHORIZATION TO CONTINUE OPERATION OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Competition] Contract Competition] AUTHORIZATION TO CONTINUE OPERATION OF THE_[insert the name of the laboratory/site/facility]___ UNDER A MANAGEMENT AND OPERATING CONTRACT The _[insert the name of the laboratory/site/facility]_ is currently managed and operated by _[insert the name of the contractor]_ for the Department of Energy under a Management and Operating (M&O) contract as defined in Federal Acquisition Regulation (FAR) Subpart 17.6. The current contract and the determination authorizing the M&O form of contract expire on _[insert the expiration date]_. _[In one or two sentences, briefly describe the laboratory/site/facility mission]_. A new contract is currently being procured by the DOE _[insert DOE office name]_, under Request for Proposals (RFP) number _[insert RFP number]_. The resultant

391

AUTHORIZATION TO CONTINUE OPERATION OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-competitive Extension] Non-competitive Extension] AUTHORIZATION TO CONTINUE OPERATION OF THE_[insert the name of the laboratory/site/facility]___ UNDER A MANAGEMENT AND OPERATING CONTRACT The _[insert the name of the laboratory/site/facility]_ is currently managed and operated by _[insert the name of the contractor]_ for the Department of Energy under DOE contract _[insert contract number]._This contract is a Management and Operating (M&O) contract as defined in Federal Acquisition Regulation (FAR) Subpart 17.6. The current contract and the determination authorizing the M&O form of contract expire on _[insert the expiration date]_. A non-competitive extension is currently being pursued in accordance with FAR 6.301. [In one or two sentences, briefly describe the

392

Response Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response Operations Response Operations Response Operations Overview The federal government primarily plays a coordinating and support role during disaster response. DOE's role is to facilitate recovery from disruptions to the energy supply. OE's capabilities and resources include personnel with emergency response and energy systems operations experience, leading-edge analytical modeling and visualization capabilities, coordination and contacts with private industry, state governments, and U.S. government agencies, and facilitation of special policy waivers or legal authorities by the Secretary of Energy. Response and Restoration State and Local Energy Assurance Planning National Response Framework ESF-12 This National Response Framework (NRF) is a guide to how the Nation conducts all-hazards response. Emergency Support Function #12 - Energy

393

Operations and Maintenance Management Support  

Energy.gov (U.S. Department of Energy (DOE))

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

394

DOE Oak Ridge Operations managers  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Operations managers As the last few articles have shown, the period immediately following the end of World War II was one of constant and continuing change for Oak Ridge....

395

Operating and Capital Expenditures Models  

Science Journals Connector (OSTI)

In this chapter, you will learn how to plan, create, and use the Operating Expenditure (OPEX) model and the Capital Expenditure (CAPEX) model. These models are used ... to forecast, respectively, general operatin...

2009-01-01T23:59:59.000Z

396

Operations and Maintenance Program Measurement  

Energy.gov (U.S. Department of Energy (DOE))

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

397

DIII-D research operations  

SciTech Connect

This report discusses the research on the following topics: DIII-D program overview; divertor and boundary research program; advanced tokamak studies; tokamak physics; operations; program development; support services; contribution to ITER physics R D; and collaborative efforts.

Baker, D. (ed.)

1993-05-01T23:59:59.000Z

398

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2013 18, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, 2013: A manager at the Advanced Mixed Waste Treatment Project (AMWTP) determined that the AMWTP Safety Analysis process required review due to an operational trend of fire/combustion events in the Treatment Facility (TF) box lines. Safety analysis for the TF is

399

Redundant operators for Ising spins  

Science Journals Connector (OSTI)

We remind the reader of the important role that could be played in Monte Carlo renormalization-group studies by redundant operators, defined to be changes in the Hamiltonian due to infinitesimal changes of variables. We then overcome the problem of defining an infinitesimal change of variables for discrete Ising spins and construct redundant operators in d=2 and 3. We analyze how they may be seen in numerical experiments.

Ganpathy Murthy and R. Shankar

1985-11-01T23:59:59.000Z

400

Conduct of operations implementation plan  

SciTech Connect

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Lease Operations Environmental Guidance Document  

SciTech Connect

This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

Bureau of Land Management

2001-02-14T23:59:59.000Z

402

Reactor operation safety information document  

SciTech Connect

The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

Not Available

1990-01-01T23:59:59.000Z

403

TFTR tritium operations lessons learned  

SciTech Connect

The Tokamak Fusion Test Reactor which is the progenitor for full D-T operating tokamaks has successfully processed > 81 grams of tritium in a safe and efficient fashion. Many of the fundamental operational techniques associated with the safe movement of tritium through the TFTR facility were developed over the course of many years of DOE tritium facilities (LANL, LLNL, SRS, Mound). In the mid 1980`s The Tritium Systems Test Assembly (TSTA) at LANL began reporting operational techniques for the safe handling of tritium, and became a major conduit for the transfer of safe tritium handling technology from DOE weapons laboratories to non-weapon facilities. TFTR has built on many of the TSTA operational techniques and has had the opportunity of performing and enhancing these techniques at America`s first operational D-T fusion reactor. This paper will discuss negative pressure employing `elephant trunks` in the control and mitigation of tritium contamination at the TFTR facility, and the interaction between contaminated line operations and {Delta} pressure control. In addition the strategy employed in managing the movement of tritium through TFTR while maintaining an active tritium inventory of < 50,000 Ci will be discussed. 5 refs.

Gentile, C.A.; Raftopoulos, S.; LaMarche, P. [Princeton Plasma Physics Lab., NJ (United States)] [and others

1996-12-31T23:59:59.000Z

404

C:\WINNT\Profiles\caseys\DESKTOP\L T R C\PICs Program\Permanent Markers\monument survey.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

Monument Survey Monument Survey Waste Isolation Pilot Plant Carlsbad, New Mexico August 31, 2000 Contractor Report Permanent Markers Monument Survey Waste Isolation Pilot Plant Carlsbad, New Mexico August 31, 2000 Prepared for: Westinghouse Government Environmental Services Company Waste Isolation Division P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 i John Hart and Associates, P.A. Table of Contents 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Related DOE Commitments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Study Objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.0 Survey Rationale and Methods . . . . . . . . . . . . . . . . . . . . . . . . .

405

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

406

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

January 6, 2014 January 6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Notable Accomplishments: Contracting companies supporting EM's cleanup program and the Office of Nuclear Energy at the Idaho site volunteered to be among the first to use a new DOE

407

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

26, 2013 26, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) July 31, 2013: The Idaho Treatment Group, LLC (ITG), the managing contractor for the Advanced Mixed Waste Treatment Project received a warning letter from the State of Idaho's Department of Environmental quality regarding self- reported RCRA permit violations which

408

WEBtop (Operating Systems on Web)  

Science Journals Connector (OSTI)

WebOS (Web based operating system) is a new form of Operating Systems. You can use your desktop as a virtual desktop on the web accessible via a browser with multiple integrated built?in applications that allow the user to easily manage and organize her data from any location. Desktop on web can be named as WEBtop. This paper starts with a introduction of WebOS and its benefits. For this paper We have reviewed some most interesting WebOS available nowadays and tried to provide a detailed description of their features. We have identified some parameters as comparison criteria among them. A technical review is given with research design and future goals to design better web based operating systems is a part of this study. Findings of the study conclude this paper.

M. K. Sharma; Rajeev Kumar

2011-01-01T23:59:59.000Z

409

Twenty Years of Tevatron Operation  

Science Journals Connector (OSTI)

The superconducting Tevatron accelerator at Fermi National Accelerator Laboratory (Fermilab) has surpassed twenty years of operation. The Tevatron is still the highest energy particle accelerator in the world and will remain so until the commissioning of the LHC in Europe later this decade. The Tevatron has operated in a Fixed Target mode accelerating a proton beam into stationary targets/detectors as well as a Colliding Beam mode continuously colliding counter rotating beams of protons and antiprotons. Upon completion the Tevatron cryogenic system became the world’s largest helium refrigeration system. In 1993 the Tevatron cryogenic system was given the designation of International Historic Mechanical Engineering Landmark by the American Society of Mechanical Engineers. The operational history experiences and statistics of the Tevatron with an emphasis on the cryogenic system is presented. Improvements upgrades and current challenges of the cryogenic system are discussed.

J. C. Theilacker

2004-01-01T23:59:59.000Z

410

Performing a local barrier operation  

DOE Patents (OSTI)

Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value of the counter, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

2014-03-04T23:59:59.000Z

411

Performing a local barrier operation  

DOE Patents (OSTI)

Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

2014-03-04T23:59:59.000Z

412

Electric Vehicle Site Operator Program  

SciTech Connect

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-01-01T23:59:59.000Z

413

Functional Verification through Operation Diagnostics  

E-Print Network (OSTI)

ICEBO'11 Abstract Burgoyne 110328.docx Page 1 of 1 ? Ebert & Baumann Consulting Engineers, Inc. A B S T R A C T ICEBO 2011 New York City March 28, 2011 Functional Verification through Operation Diagnostics One of the core objectives... throughout occupancy. In this paper, Operation Diagnostics is applied in a case study. Ben Burgoyne, LEED? AP Mechanical Engineer Ebert & Baumann Consulting Engineers, Inc. A n E n t e r p r i s e o f t h e E b e r t - C o n s u l t i n g G r...

Burgoyne, B.

414

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

415

SAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS  

E-Print Network (OSTI)

The operation of the A-frame and Hydro Boom in the conduct of ship's work and training other personnelSAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS 6.5 A-FRAME AND BOOM OPERATIONS Originator: Approved Boom operations and the qualification for training operators on the R/V Oceanus. 6.5.2 Responsibility

Kurapov, Alexander

416

Tensor Products of Operator Systems Mark Tomforde  

E-Print Network (OSTI)

Tensor Products of Operator Systems Mark Tomforde (Joint work with Ali Kavruk, Vern Paulsen Tomforde (Univeristy of Houston) Tensor Products of Operator Systems October 19, 2009 1 / 37 #12;Operator Spaces and Operator Systems An operator space is a subspace of B(H). Mark Tomforde (Univeristy of Houston

Kerr, David

417

Cooperative Education Detailed Operational Procedures  

E-Print Network (OSTI)

credits of Cooperative education for one of the required elective courses in the ME programME 3990 Cooperative Education Detailed Operational Procedures Overview Cooperative education and Aeronautical Engineering faculty. Cooperative education is not a required component of the ME program

de Doncker, Elise

418

Chief Operating Officer Joe Bengfort  

E-Print Network (OSTI)

Virtualization Engineer Jason Braatz Virtualization Engineer Dong Tran Sr. Intel/Citrix Systems Engineer Mark/Citrix Systems Engineer Hossain Bayat Sr. Desktop Systems Engineer Christopher Hester Desktop Systems Engineer Karen O'Neill Director ­ IT Operations Mark Uchi Field Services Manager Michael Fernandez FS Technical

Yamamoto, Keith

419

Chief Operating Officer Joe Bengfort  

E-Print Network (OSTI)

Engineer Jason Braatz Virtualization Engineer Dong Tran Sr. Intel/Citrix Systems Engineer Mark Sorbi Sr/Citrix Systems Engineer Hossain Bayat Sr. Desktop Systems Engineer Christopher Hester Desktop Systems Engineer'Neill Director ­ IT Operations Mark Uchi Field Services Manager Michael Fernandez FS Technical Lead Vacant FS

Derisi, Joseph

420

Comparing PRAs with operating experience  

SciTech Connect

Probabilistic Risk Assessment is widely used to estimate the frequencies of rare events, such as nuclear power plant accidents. An obvious question concerns the extent to which PRAs conform to operating experience--that is, do PRAs agree with reality? The authors discuss a formal methodology to address this issue and examine its performance using plant-specific data.

Picard, R.R.; Martz, H.F.

1998-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EMISSIONS TO AIR OPERATIONAL PROCEDURE  

E-Print Network (OSTI)

EMISSIONS TO AIR OPERATIONAL PROCEDURE Swansea University Estates Services Singleton Park Swansea to Air Department: Estates and Facilities Site: All Author: Ambreen Jahangir Approved by: Mark Durdin PURPOSE: To minimise emissions and discharges to air from boilers, fume cupboards, air conditioning

Harman, Neal.A.

422

Safety of Nuclear Explosive Operations  

Directives, Delegations, and Requirements

This directive establishes responsibilities and requirements to ensure the safety of routine and planned nuclear explosive operations and associated activities and facilities. Cancels DOE O 452.2A and DOE G 452.2A-1A. Canceled by DOE O 452.2C.

2001-08-07T23:59:59.000Z

423

Richland Operations Office technology summary  

SciTech Connect

This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

Not Available

1994-05-01T23:59:59.000Z

424

UC Operational Plan 2006 INTRODUCTION  

E-Print Network (OSTI)

(FMP) including a financial forecast model and capital expenditure plan April Finance Manager 3-2006) and develop a follow-on Financial Management Plan which will include a financial forecast model and a capital expenditure plan Operational Steps 2006 Timeline Task Responsibility 1. Complete the implementation

Hickman, Mark

425

Auditing of Programs and Operations  

Directives, Delegations, and Requirements

To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Cancels DOE O 224.2.

2007-11-09T23:59:59.000Z

426

Session 6: Systems operational performance  

E-Print Network (OSTI)

Three contributions were presented in this session: Tune and Orbit Feedbacks Performances: A User Perspective by Laurette Ponce , Beam Instrumentation Performance Overview by Mariusz Sapinski and LHC RF 2011 and beyond by Philippe Baudrenghien . This contribution recapitulates the outlooks given for 2012, the points to be followed up and the discussions originating in the “Systems Operational Performance” session.

Holzer, E B

2012-01-01T23:59:59.000Z

427

Operation REDWING 1956. Technical report  

SciTech Connect

REDWING was a 17-detonation atmospheric nuclear weapons test series conducted in the Marshall Islands at Enewetak and Bikini atolls in spring and summer 1956. This is a report of DOD personnel in REDWING with an emphasis on operations and radiological safety.

Bruce-Henderson, S.; Gladeck, F.R.; Hallowell, J.H.; Martin, E.J.; McMullan, F.W.

1982-08-01T23:59:59.000Z

428

Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group  

SciTech Connect

The facilities reported on are all in a fairly mature state of operation, as evidenced by the very detailed studies and correction schemes that all groups are working on. First- and higher-order aberrations are diagnosed and planned to be corrected. Very detailed beam measurements are done to get a global picture of the beam dynamics. More than other facilities the high-luminosity colliders are struggling with experimental background issues, mitigation of which is a permanent challenge. The working group dealt with a very wide rage of practical issues which limit performance of the machines and compared their techniques of operations and their performance. We anticipate this to be a first attempt. In a future workshop in this series, we propose to attempt more fundamental comparisons of each machine, including design parameters. For example, DAPHNE and KEKB employ a finite crossing angle. The minimum value of {beta}*{sub y} attainable at KEKB seems to relate to this scheme. Effectiveness of compensation solenoids and turn-by-turn BPMs etc. should be examined in more detail. In the near future, CESR-C and VEPP-2000 will start their operation. We expect to hear important new experiences from these machines; in particular VEPP-2000 will be the first machine to have adopted round beams. At SLAC and KEK, next generation B Factories are being considered. It will be worthwhile to discuss the design issues of these machines based on the experiences of the existing factory machines.

Wienands, U.; /SLAC; Funakoshi, Y.; /KEK, Tsukuba

2012-04-20T23:59:59.000Z

429

On-orbit maintenance operations strategy for the International Space Station—concept and implementation  

Science Journals Connector (OSTI)

The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned assembled on orbit and multi-national. With this technical and operational challenge a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis supply maintenance and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance a myriad of products and processes must be created and coordinated such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

Linda P. Patterson

2001-01-01T23:59:59.000Z

430

OPERATION OF A PUBLIC GEOLOGIC CORE AND SAMPLE REPOSITORY IN HOUSTON TEXAS  

SciTech Connect

In the spring of 2002, the Department of Energy provided an initial 1-year grant to the Bureau of Economic Geology (BEG) at The University of Texas at Austin (UT). The grant covered the one-year operational expenses of a worldclass core and cuttings facility located in Houston, Texas, that BP America donated to the BEG. The DOE investment of $300,000, matched by a $75,000 UT contribution, provided critical first-year funds that were heavily leveraged by the BP gift of $7.0 million in facilities and cash. DOE also provided a one-month extension and grant of $30,000 for the month of May 2003. A 5-year plan to grow a permanent endowment in order to manage the facility in perpetuity is well under way and on schedule. The facility, named the Houston Research Center, represents an ideal model for a strong Federal, university, and private partnership to accomplish a national good. This report summarizes the activities supported by the initial DOE grant during the first 13 months of operation and provides insight into the activities and needs of the facility in the second year of operation.

Scott W. Tinker

2003-06-01T23:59:59.000Z

431

Analysis of accidents during flashing operations  

E-Print Network (OSTI)

occurred at intersections under flashing operation compared to those operating in the normal mode. A statistical analysis was conducted to determine the safety of flashing signal operation. No significant increases in accidents or accident severity were...

Obermeyer, Michael Edward

2012-06-07T23:59:59.000Z

432

Integrating Solar PV in Utility System Operations  

E-Print Network (OSTI)

PV into Utility System Operations System Scheduling APSSolar PV into Utility System Operations and occurs at 5 p.m.Solar PV in Utility System Operations A. Mills 1 , A.

Mills, A.

2014-01-01T23:59:59.000Z

433

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

NLE Websites -- All DOE Office Websites (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

434

Independent Activity Report, Richland Operations Office - April...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project HIAR-RL-2011-04-07 This Independent Activity Report...

435

Independent Oversight Review, Savannah River Operations Office...  

Energy Savers (EERE)

Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the...

436

Science Co-Operation Office, Middle East  

Science Journals Connector (OSTI)

... THE Science Co-operation ... Co-operation Office, Middle East, of Unesco, in Cairo publishes a list of the scientific papers ...

1949-02-12T23:59:59.000Z

437

Operating Experience Summary, 2013-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investigation: Contamination at Los Alamos Neutron Science Center Due to Deficiencies in Conduct of Operations ...5 Page 1 Page 5 Page 1 of 12 Operating Experience Summary...

438

Independent Activity Report, Hanford Operations Office - July...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

assessment included evaluation of work control, fall protection, quality assurance, and conduct of operations. Independent Activity Report, Hanford Operations Office - July 2010...

439

Operating Experience Summaries | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contamination at Los Alamos Neutron Science Center Due to Deficiencies in Conduct of Operations - Page 5 August 14, 2013 Operating Experience Summary - 2013-02 - August 14,...

440

Total Number of Operable Refineries  

U.S. Energy Information Administration (EIA) Indexed Site

Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge Capacity (B/SD) Thermal Cracking Downstream Charge Capacity (B/SD) Thermal Cracking Total Coking Downstream Charge Capacity (B/SD) Thermal Cracking Delayed Coking Downstream Charge Capacity (B/SD Thermal Cracking Fluid Coking Downstream Charge Capacity (B/SD) Thermal Cracking Visbreaking Downstream Charge Capacity (B/SD) Thermal Cracking Other/Gas Oil Charge Capacity (B/SD) Catalytic Cracking Fresh Feed Charge Capacity (B/SD) Catalytic Cracking Recycle Charge Capacity (B/SD) Catalytic Hydro-Cracking Charge Capacity (B/SD) Catalytic Hydro-Cracking Distillate Charge Capacity (B/SD) Catalytic Hydro-Cracking Gas Oil Charge Capacity (B/SD) Catalytic Hydro-Cracking Residual Charge Capacity (B/SD) Catalytic Reforming Charge Capacity (B/SD) Catalytic Reforming Low Pressure Charge Capacity (B/SD) Catalytic Reforming High Pressure Charge Capacity (B/SD) Catalytic Hydrotreating/Desulfurization Charge Capacity (B/SD) Catalytic Hydrotreating Naphtha/Reformer Feed Charge Cap (B/SD) Catalytic Hydrotreating Gasoline Charge Capacity (B/SD) Catalytic Hydrotreating Heavy Gas Oil Charge Capacity (B/SD) Catalytic Hydrotreating Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Kerosene/Jet Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Diesel Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Other Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Residual/Other Charge Capacity (B/SD) Catalytic Hydrotreating Residual Charge Capacity (B/SD) Catalytic Hydrotreating Other Oils Charge Capacity (B/SD) Fuels Solvent Deasphalting Charge Capacity (B/SD) Catalytic Reforming Downstream Charge Capacity (B/CD) Total Coking Downstream Charge Capacity (B/CD) Catalytic Cracking Fresh Feed Downstream Charge Capacity (B/CD) Catalytic Hydro-Cracking Downstream Charge Capacity (B/CD) Period:

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CMS FNAL Remote Operations Center  

NLE Websites -- All DOE Office Websites (Extended Search)

LHC@FNAL Remote Operations Center (ROC) at Fermilab is located on the first floor of Wilson Hall. From the ROC, shifters perform real-time monitoring of the data recorded by the CMS Experiment. LHC@FNAL Remote Operations Center (ROC) at Fermilab is located on the first floor of Wilson Hall. From the ROC, shifters perform real-time monitoring of the data recorded by the CMS Experiment. ROC WBM / WBM Twiki FNAL ELog Mailing List Agendas / ROC Presentations & Notes WBM Publications Runs CVS SiTracker / MTCC AEM / AEM help Screen Snapshot Service FAQ Accounts & Nodes New User Instructions WebCams CMS Workbook Directories / Glossaries Photos Vidyo / EVO Google / Wikipedia LHC@FNAL Computing Console Map Documents Mailing List One East Mtg Schedule rocshare Telephones To Do List Video Conferencing CMS Shifter CSC DAQ DataOps DQM / FNAL ROC ECAL Event Display HCAL Pixel Trigger Global Run Calendar CMS Live Contact List DAQ Status DAS

442

Modal Analysis for Grid Operation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presenter: Ning Zhou Pacific Northwest National Laboratory ning.zhou@pnnl.gov 27/28 June 2013 Washington, DC DOE/OE Transmission Reliability Program Past Oscillation Event - 1996/08/10 [bitmap version 1100 1200 1300 1400 1500 15:42:03 15:48:51 15:47:36 Power (MW) August 10, 1996 Western Power System Breakup California-Oregon Intertie Time Domain ~ -3.1% < ~3.5% Damping ~ 8.4% Early Warning ~6 minutes Freq Domain Project Objective  Ways to Improve Damping - Power System Stabilizer (PSS): parameters pre-tuned based on off-line scenarios - Reactive Support: locations pre-selected based on off-line scenarios - Adjustment of Operator Controllable Variables : operator actions determined with the on-line scenarios  Objective of this Project:

443

Tide operated power generating apparatus  

SciTech Connect

An improved tide operated power generating apparatus is disclosed in which a hollow float, rising and falling with the ocean tide, transmits energy to a power generator. The improvement comprises means for filling the float with water during the incoming tide to provide a substantial increase in the float dead weight during the outgoing tide. Means are further provided to then empty the float before the outgoing tide whereby the float becomes free to rise again on the next incoming tide.

Kertzman, H. Z.

1981-02-03T23:59:59.000Z

444

Knob manager (KM) operators guide  

SciTech Connect

KM, Knob Manager, is a tool which enables the user to use the SUNDIALS knob box to adjust the settings of the control system. The followings are some features of KM: dynamic knob assignments with the user friendly interface; user-defined gain for individual knob; graphical displays for operating range and status of each process variable is assigned; backup and restore one or multiple process variable; save current settings to a file and recall the settings from that file in future.

NONE

1993-10-08T23:59:59.000Z

445

Office of Headquarters Security Operations  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

446

TEMPERED OPERATORS AND THE HEAT KERNEL AND COMPLEX POWERS OF ELLIPTIC PSEUDODIFFERENTIAL OPERATORS  

E-Print Network (OSTI)

TEMPERED OPERATORS AND THE HEAT KERNEL AND COMPLEX POWERS OF ELLIPTIC PSEUDODIFFERENTIAL OPERATORS operator and complex powers of b-pseudodi#27;erential operators, as the heat operator and complex powers are the Laplace and Mellin transforms, respectively, of the resolvent. The heat operator and complex powers

Loya, Paul

447

Enhanced Building Operation Using "Operation Diagnostics" - A Case Study  

E-Print Network (OSTI)

the utility into hot water. They are lo- cated in a central heating plant room in the basement. The distribution system maintains static heating (of- fices south-west and offices north-east), heating coils of the AHU’s, as well as central domestic hot... the dynamic operation of systems regarding reduced energy con- sumption and/or improved comfort. Available Data Base and Data Quality Data from the BAS has been recorded since Spring 2004. Due to limited capacity of the network only 160 of the 3200...

Baumann, O.

2005-01-01T23:59:59.000Z

448

High-Performance Control of Two Three-Phase Permanent-Magnet Synchronous Machines in an Integrated Drive for Automotive Applications  

SciTech Connect

The closed-loop control of an integrated dual AC drive system is presented to control two three-phase permanent-magnet motors. A five-leg inverter is employed in the drive system; three of the inverter legs are for a main traction motor, but only two are needed for a three-phase auxiliary motor by utilizing the neutral point of the traction motor. An integrated drive with reduced component count is therefore achieved by eliminating one inverter leg and its gate drivers. A modified current control scheme based on the rotor flux orientation principle is presented. Simulation and experimental results are included to verify the independent control capability of the integrated drive.

Tang, Lixin [ORNL; Su, Gui-Jia [ORNL

2008-01-01T23:59:59.000Z

449

Sliding mode-based DTC-SVM control of permanent magnet synchronous motors for plug-in electric and hybrid vehicles  

Science Journals Connector (OSTI)

This paper presents a sliding mode controller design for a permanent magnet synchronous motor used in an integrated powertrain for plug-in electric and hybrid vehicles. In order to adapt to complicated driving environment and improve the robustness of the system, a sliding mode-based torque controller is developed. At the same time, a sliding mode speed controller is also proposed to meet the need of gear shift of the integrated powertrain. The stability and robustness of the proposed controllers are analysed. Computer simulations are performed to verify the effectiveness of the proposed control system. The simulation results illustrate that fast response and small ripples are achieved using the proposed control scheme. It is also shown that the control system is robust against load variations, measurement errors and parameter uncertainty. In addition, the transition during shift is smooth. Therefore, the proposed control scheme is suitable for control of the propulsion motor for plug-in electric and hybrid vehicles.

Hong Fu; Yaobin Chen; Guangyu Tian; Quanshi Chen

2011-01-01T23:59:59.000Z

450

Rare?Earth?Free Permanent Magnets for Electrical Vehicle Motors and Wind Turbine Generators: Hexagonal Symmetry Based Materials Systems Mn?Bi and M?type Hexaferrite  

SciTech Connect

The research we conducted focuses on the rare-earth (RE)-free permanent magnet by modeling, simulating, and synthesizing exchange coupled two-phase (hard/soft) RE-free core-shell nano-structured magnet. The RE-free magnets are made of magnetically hard core materials (high anisotropy materials including Mn-Bi-X and M-type hexaferrite) coated by soft shell materials (high magnetization materials including Fe-Co or Co). Therefore, our research helps understand the exchange coupling conditions of the core/shell magnets, interface exchange behavior between core and shell materials, formation mechanism of core/shell structures, stability conditions of core and shell materials, etc.

Hong, Yang-Ki [University of Alabama] [University of Alabama; Haskew, Timothy [University of Alabama] [University of Alabama; Myryasov, Oleg [University of Alabama] [University of Alabama; Jin, Sungho [University of California San Diego] [University of California San Diego; Berkowitz, Ami [University of California San Diego] [University of California San Diego

2014-06-05T23:59:59.000Z

451

CSI3131 Operating Systems Winter 2011  

E-Print Network (OSTI)

CSI3131 ­ Operating Systems Winter 2011 Tutorial 1 - Solution 1. What are three main purposes of an operating system? Hardware abstraction: To provide an environment for a computer user to execute programs of the operation and control of I/O devices. 2. Consider the various definitions of operating systems. Consider

Stojmenovic, Ivan

452

Design of a compact, permanent magnet electron cyclotron resonance ion source for proton and H{sub 2}{sup +} beam production  

SciTech Connect

A 2.45 GHz microwave ion source was developed at China Institute of Atomic Energy (CIAE) for proton beam production of over 60 mA [B.-Q. Cui, Y.-W. Bao, L.-Q. Li, W.-S. Jiang, and R.-W. Wang, Proceedings of the High Current Electron Cyclotron Resonance (ECR) Ion Source for Proton Accelerator, APAC-2001, 2001 (unpublished)]. For various proton beam applications, another 2.45 GHz microwave ion source with a compact structure is designed and will be built at CIAE as well for high current proton beam production. It is also considered to be used for the test of H{sub 2}{sup +} beam, which could be injected into the central region model cyclotron at CIAE, and accelerated to 5 MeV before extraction by stripping. The required ECR magnetic field is supplied by all the permanent magnets rather than electrical solenoids and six poles. The magnetic field distribution provided by this permanent magnets configuration is a large and uniformly volume of ECR zone, with central magnetic field of a magnitude of {approx}875 Gs[T. Taylor and J. S. C. Wills, Nucl. Instrum. Methods Phys. Res. A 309, 37 (1991)]. The field adjustment at the extraction end can be implemented by moving the position of the magnet blocks. The results of plasma, coupling with 2.45 GHz microwave in the ECR zone inside the ion source are simulated by particle-in-cell code to optimize the density by adjusting the magnetic field distribution. The design configuration of the ion source will be summarized in the paper.

Jia Xianlu; Zhang Tianjue; Wang Chuan; Zheng Xia; Yin Zhiguo; Zhong Junqing; Wu Longcheng; Qin Jiuchang [China Institute of Atomic Energy, P.O. Box 275(3), Beijing 102413 (China); Luo Shan [The 6th Department, Communication Command Academy, Wuhan 430010 (China)

2010-02-15T23:59:59.000Z

453

Radiation dose to the internal pudendal arteries from permanent-seed prostate brachytherapy as determined by time-of-flight MR angiography  

SciTech Connect

Purpose: To determine the feasibility of time-of-flight magnetic resonance (MR) angiography to visualize the internal pudendal arteries (IPAs) in potent men undergoing permanent-seed prostate brachytherapy and to calculate the radiation dose received by these arteries. Methods and Materials: Prostate brachytherapy is performed at the University Health Network/Princess Margaret Hospital by use of transrectal ultrasound (TRUS) preplanning and preloaded needles. All patients received {sup 125}I, with a mean seed activity of 0.32 mCi/seed (0.41 U). Postplan evaluation is performed at 1 month by magnetic resonance-computed tomography fusion. Twenty consecutive potent men had time-of-flight MR angiography as part of their postplan evaluation. Results: The mean V100 was 96.5%, and the mean D90 was171.5 Gy. The IPAs were easily visualized for 18 of the 20 men. The mean peak dose received by the IPA was 17 Gy. The highest peak dose received by any patient was 38.2 Gy, with only 1 other patient receiving a peak dose greater than 30 Gy. Eleven of 18 had a measurable portion of at least 1 IPA that received 10% of the prescribed dose (V10 = 14.5 Gy). Only 2 patients had nonzero values for V25. The distal third of the IPA received the highest dose for 16 of the 18 patients. Conclusions: The IPAs can be well visualized in the majority of potent men by use of time-of-flight MR angiography 1 month after brachytherapy. The IPAs receive a low but calculable dose from permanent-seed {sup 125}I brachytherapy. Further research is needed to determine if this outcome has any correlation with subsequent potency.

Gillan, Caitlin [Department of Radiation Medicine, University Health Network, Princess Margaret Hospital, Toronto (Canada); Kirilova, Anna [Department of Radiation Physics, University Health Network, Princess Margaret Hospital, Toronto (Canada); Landon, Angela [Department of Radiation Medicine, University Health Network, Princess Margaret Hospital, Toronto (Canada); Yeung, Ivan [Department of Radiation Physics, University Health Network, Princess Margaret Hospital, Toronto (Canada); Pond, Gregory [Department of Biostatistics, University Health Network, Princess Margaret Hospital, Toronto (Canada); Crook, Juanita [Department of Radiation Oncology, University Health Network, Princess Margaret Hospital, Toronto (Canada)]. E-mail: juanita.crook@rmp.uhn.on.ca

2006-07-01T23:59:59.000Z

454

Infrastructure and Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Operations | National Nuclear Security Administration Operations | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Infrastructure and Operations Home > About Us > Our Operations > Infrastructure and Operations Infrastructure and Operations NNSA's missions require a secure production and laboratory infrastructure meeting immediate and long term needs. The Associate Administrator for

455

Guide to good practices for operations turnover  

SciTech Connect

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities``. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. ``Operations Turnover`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

456

Guide to good practices for operations turnover  

SciTech Connect

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities''. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover'' is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

457

Guide to good practices for operations turnover  

SciTech Connect

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

458

Definition: System Operating Limit | Open Energy Information  

Open Energy Info (EERE)

Operating Limit Operating Limit Jump to: navigation, search Dictionary.png System Operating Limit The value (such as MW, MVar, Amperes, Frequency or Volts) that satisfies the most limiting of the prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria. System Operating Limits are based upon certain operating criteria. These include, but are not limited to: Facility Ratings (Applicable pre- and post- Contingency equipment or facility ratings), Transient Stability Ratings (Applicable pre- and post-Contingency Stability Limits), Voltage Stability Ratings (Applicable pre- and post- Contingency Voltage Stability), System Voltage Limits (Applicable pre- and post- Contingency Voltage Limits)[1] Also Known As SOL

459

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

460

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

FUPWG Purpose, Policies, and Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

462

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

463

FUPWG Purpose, Policies, and Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

464

Compact bilinear operators and commutators  

E-Print Network (OSTI)

) For all bounded B1 ? X,B2 ? Y , T (B1 ×B2) is precompact. (c7) For all bounded sequences {(xn, yn)} ? X × Y , the sequence {T (xn, yn)} has a convergent subsequence. Furthermore, if Z is Banach, then (c1) is also equivalent to: (c8) For all bounded B ? X...(X ×Y, Z) ? B(X ×Y, Z), assume that the compact bilinear operator T is not bounded. Then, for some r > 0, there exists a sequence (xn, yn) ? Br,X×Y , and ?T (xn, yn)? ? ?. Thus, {T (xn, yn)} could not have a convergent subsequence, so T (Br,X×Y ) would...

Bé nyi, Á rpá d; Torres, Rodolfo H.

2013-07-01T23:59:59.000Z

465

BNL | ATF Operations Weekly Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Weekly Summary Operations Weekly Summary Week Starts E-beam Status CO2 Status 2013/12/30 Up time: 0 days Down time: 5 days Activity: Maintenance & holiday week Up time: 0 days Down time: 5 days (setup) Activity: OPA work & holiday week 2013/12/23 Up time: 1 days Down time: 4 days (holiday week) Exp: Beam Studies Group: ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days Activity: OPA work & holiday week 2013/12/16 Up time: Down time: Exp: AE-58, ERL BPM testing + beam studies Group: AE58, BNL (C-AD) / ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days (setup) Activity: OPA work, EUVL test setup (AE59) and maintenance 2013/12/09 Up time: Down time: Exp: AE-52, Beam Manipulation by self wakefield Group: AE52, Euclid techlabs Energy: 57.6 MeV

466

Operational Axioms for Quantum Mechanics  

E-Print Network (OSTI)

The mathematical formulation of Quantum Mechanics in terms of complex Hilbert space is derived for finite dimensions, starting from a general definition of "physical experiment" and from five simple Postulates concerning "experimental accessibility and simplicity". For the infinite dimensional case, on the other hand, a C*-algebra representation of physical transformations is derived, starting from just four of the five Postulates via a Gelfand-Naimark-Segal (GNS) construction. The present paper simplifies and sharpens the previous derivation in version 1. The main ingredient of the axiomatization is the postulated existence of "faithful states" that allows one to calibrate the experimental apparatus. Such notion is at the basis of the operational definitions of the scalar product and of the "transposed" of a physical transformation. What is new in the present paper with respect to quant-ph/0603011 is the operational deduction of an involution corresponding to the "complex-conjugation" for effects, whose extension to transformations allows to define the "adjoint" of a transformation when the extension is composition-preserving.

Giacomo Mauro D'Ariano

2006-11-08T23:59:59.000Z

467

Thailand gas project now operational  

SciTech Connect

Now operational, Phase 1 of Thailand's first major natural gas system comprises one of the world's longest (264 miles) offshore gas lines. Built for the Petroleum Authority of Thailand (PTT), this system delivers gas from the Erawan field in the Gulf of Thailand to two electrical power plants near Bangkok, operated by the Electricity Generating Authority of Thailand (EGAT). The project required laying about 360 miles of pipeline, 34-in., 0.625 in.-thick API-5LX-60 pipe offshore and 28-in., 0.406 in.-thick API-5LX-60 onshore. The offshore pipe received a coal-tar coating, a 3.5-5.0 in. concrete coating, and zinc sacrificial-anode bracelets. The onshore line was coated with the same coal-tar enamel and, where necessary, with concrete up to 4.5 in. thick. Because EGAT's two power plants are the system's only customers, no more pipeline will be constructed until deliveries, currently averaging about 100 million CF/day, reach the 250 million CF/day level. The project's second phase will include additional pipelines as well as an onshore distribution network to industrial customers.

Horner, C.

1982-08-01T23:59:59.000Z

468

PEP-II Operations Report  

SciTech Connect

PEP-II is a two-ring asymmetric B factory operating at the Upsilon(4S) resonance. It was constructed by a SLAC-LBNL-LLNL collaboration. The collider comprises two rings, a High-Energy Ring (HER) storing 9 GeV electrons, and a Low-Energy Ring (LER) storing 3.1 GeV positrons. Commissioning of the HER began in mid-1997 and commissioning of the LER began in mid-1998. First evidence for collisions was obtained on July 23, 1998. The BaBar detector was installed in early 1999, and commissioning with the detector commenced in May 1999. By September 1999, PEP-II had reached a peak luminosity of 1.35 x 10{sup 33} cm{sup {minus}2} s{sup {minus}1}. In the present run, which began in October 1999, the peak luminosity has reached 3.1 x 10{sup 33} cm{sup {minus}2} s{sup {minus}1} and the integrated luminosity delivered is 25 fb{sup {minus}1}. At present, PEP-II is the world's highest luminosity collider. In this paper we describe the startup experience and summarize the operational experience during fiscal year 2000 (from October 1999 through September 2000). Plan s for luminosity upgrades are briefly described.

Zisman, Michael S.

2000-11-01T23:59:59.000Z

469

Definition: Operating Plan | Open Energy Information  

Open Energy Info (EERE)

Plan Plan Jump to: navigation, search Dictionary.png Operating Plan A document that identifies a group of activities that may be used to achieve some goal. An Operating Plan may contain Operating Procedures and Operating Processes. A company-specific system restoration plan that includes an Operating Procedure for black-starting units, Operating Processes for communicating restoration progress with other entities, etc., is an example of an Operating Plan.[1] Related Terms Operating Procedure, smart grid References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Operating_Plan&oldid=502599

470

DAFNE Setup And Operation With the Crab-Waist Collision Scheme  

SciTech Connect

In the second half of 2007 a major upgrade has been implemented on the Frascati DA{Phi}NE collider in order to test the novel idea of Crab-Waist collisions. New vacuum chambers and permanent quadrupole magnets have been designed, built and installed to realize the new configuration. At the same time the performances of relevant hardware components, such as fast injection kickers and shielded bellows have been improved relying on new design concepts. The collider has been successfully commissioned in this new configuration. The paper describes several experimental results about linear and non-linear optics setup and optimization, damping of beam-beam instabilities and discusses the obtained luminosity performances. DA{Phi}NE [1] is the Frascati lepton collider working at the c m. energy of the {Phi} meson resonance (1020). It came in operation in 2001 and till summer 2007 provided luminosity, in sequence, to three different experiments which logged a total integrated luminosity of {approx} 4.4 fb{sup -1}. During these years the collider reached its best performances in terms of luminosity and background (L{sub peak} = 1.6 x 10{sup 32} cm{sup -2}s{sup -1} L{sub day} {approx} 10 pb{sup -1}) by means of several successive upgrades, relying on the experience gathered during the collider operations and implemented exploiting the shutdowns required for the experiment change over [2, 3, 4].

Milardi, C.; Alesini, D.; Biagini, M.E.; Biscari, C.; Boni, R.; Boscolo, M.; Bossi, F.; Buonomo, B.; Clozza, A.; Delle Monache, G.; Demma, T.; Di Pasquale, E.; Di Pirro, G.; Drago, A.; Gallo, A.; Ghigo, A.; Guiducci, S.; Ligi, C.; Marcellini, F.; Mazzitelli, G.; Murtas, F.; /Frascati /Orsay, LAL /Novosibirsk, IYF /CERN /Rome III U. /Rome U. /KEK, Tsukuba /INFN, Pisa /Pisa U. /INFN, Cosenza /INFN, Rome /SLAC

2011-10-21T23:59:59.000Z

471

Numerical Investigation of Operational Shocks and Vibrations in Mobile Hard Disk Drives  

E-Print Network (OSTI)

permanent NdFeB magnet is attached to the hub, which is actuated by the set of electromagnetic coils present outside the shaft’

Rai, Rahul

2011-01-01T23:59:59.000Z

472

Intermodal Transportation Operation System ( ITOS ) For The State Of California  

E-Print Network (OSTI)

Operation Systems ..31transportation operation system (ITOS) of the future,Transportation Operation System. Figure 8 envisions TMCs as

Hall, Randolph; Parekh, Chethan; Thakker, Viral

1998-01-01T23:59:59.000Z

473

IIIPRISMA System Operator's Manual PRISMA Therapy Options ............................................................................. 2  

E-Print Network (OSTI)

IIIPRISMA System Operator's Manual ... PRISMA Therapy Options .................................................................................................... PRISMA System ............................... xvi Operator's Manual ......................................................... #12;PRISMA System Operator's Manual ia Controller CCA

Kay, Mark A.

474

Office of Headquarters Security Operations | Department of Energy  

Office of Environmental Management (EM)

Headquarters Security Operations Office of Headquarters Security Operations Mission The Office of Headquarters Security Operations strengthens national security by protecting...

475

Emergency Operations Training Academy | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Operations Training Academy | National Nuclear Security Operations Training Academy | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Emergency Operations Training Academy Home > About Us > Our Programs > Emergency Response > Training > Emergency Operations Training Academy Emergency Operations Training Academy Rotating image showing pictures of Classroom, Online and Hands on trainings

476

The Technology of Cyber Operations Symposium on Cyber Operations and National  

E-Print Network (OSTI)

operations can be conducted with plausible deniability But adversaries make mistakes too, and allThe Technology of Cyber Operations Herb Lin Symposium on Cyber Operations and National Security not acknowledge role of offensive operations. · Offensive cyber operations can also have non-defensive purposes

477

Silberschatz, Galvin and Gagne 2009Operating System Concepts 8th Edition, Chapter 2: Operating-System  

E-Print Network (OSTI)

Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition, Chapter 2: Operating-System Structures #12;2.2 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition A View of Operating System Services #12;2.3 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th

Yang, Zijiang "James"

478

MINIMAL AND MAXIMAL OPERATOR SPACES AND OPERATOR SYSTEMS IN ENTANGLEMENT THEORY  

E-Print Network (OSTI)

MINIMAL AND MAXIMAL OPERATOR SPACES AND OPERATOR SYSTEMS IN ENTANGLEMENT THEORY NATHANIEL JOHNSTON-maximal operator spaces and operator systems, and investigate their relationships with the basic separability operator systems that were recently introduced and show that their cones of positive elements are exactly

Paulsen, Vern

479

Continuity of Operations Plan (COOP)  

NLE Websites -- All DOE Office Websites (Extended Search)

You are here: DOE-ID Home > COOP Continuity of Operations Plan (COOP) Call-In Number: 1-208-526-COOP (2667) or 1-877-DOE-DOE1 (1-877-363-3631) Wait for recording to start then Dial 382: If you are directed or forced to evacuate your current location to an alternate site, please contact us as soon as possible to advise us that you are safe and with a means of contacting you. This toll free or local number can be used by employees or their families to report their whereabouts or the whereabouts of another DOE-ID employee. Email Check-In: In addition to the call-in number, employees and families can report their status via a email check-in system. To access the email please click here. The email based check in system should only be used by DOE ID Employees.

480

Energy San Francisco Operations Office  

Office of Legacy Management (LM)

Depariment of ' Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation Post Office BOX 309 Canoga Park Dear 8 a CA 91304 G ers : Remedial action was taken to decontaminate the Hot Cave (Building 003) and Sodium Reactor Experiment (SRE) under Contract No. DE-AT03-76SF75008. The report of the post remedial survey, performed by Argonne National Laboratory, indicates that the levels of contamination are below the decontamination criteria agreed to between the State of California and DOE/SAN. Based on- this report and the enclosed letter from J. E. Baublitz to Dr. Wynveen, DOE/SAN is releasing for unrestricted use Building 003 and the SRE. Sincerely,

Note: This page contains sample records for the topic "operating permanently irrespective" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Chicago Operations Office: Technology summary  

SciTech Connect

This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

Not Available

1994-12-01T23:59:59.000Z

482

Spectral Functions of Singular Operators  

E-Print Network (OSTI)

The asymptotic expansion of the heat-kernel for small values of its argument has been studied in many different cases and has been applied to 1-loop calculations in Quantum Field Theory. In this thesis we consider this asymptotic behavior for certain singular differential operators which can be related to quantum fields on manifolds with conical singularities. Our main result is that, due to the existence of this singularity and of infinitely many boundary conditions of physical relevance related to the admissible behavior of the fields on the singular point, the heat-kernel has an "unusual" asymptotic expansion. We describe examples where the heat-kernel admits an asymptotic expansion in powers of its argument whose exponents depend on "external" parameters. As far as we know, this kind of asymptotics had not been found and therefore its physical consequences are still unexplored.

Pablo Pisani

2014-10-28T23:59:59.000Z

483

Augmented reality building operations tool  

DOE Patents (OSTI)

A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).

Brackney, Larry J.

2014-09-09T23:59:59.000Z

484

STANDARD OPERATING PROTOCOLS FOR DECOMMISSIONING  

SciTech Connect

Decommissioning projects at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites are conducted under project-specific decision documents, which involve extensive preparation time, public comment periods, and regulatory approvals. Often, the decision documents must be initiated at least one year before commencing the decommissioning project, and they are expensive and time consuming to prepare. The Rocky Flats Environmental Technology Site (RFETS) is a former nuclear weapons production plant at which hazardous substances and wastes were released or disposed during operations. As a result of the releases, RFETS was placed on the National Priorities List in 1989, and is conducting cleanup activities under a federal facilities compliance agreement. Working closely with interested stakeholders and state and federal regulatory agencies, RFETS has developed and implemented an improved process for obtaining the approvals. The key to streamlining the approval process has been the development of sitewide decision documents called Rocky Flats Cleanup Agreement Standard Operating Protocols or ''RSOPs.'' RSOPs have broad applicability, and could be used instead of project-specific documents. Although no two decommissioning projects are exactly the same and they may vary widely in contamination and other hazards, the basic steps taken for cleanup are usually similar. Because of this, using RSOPs is more efficient than preparing a separate project-specific decision documents for each cleanup action. Over the Rocky Flats cleanup life cycle, using RSOPs has the potential to: (1) Save over 5 million dollars and 6 months on the site closure schedule; (2) Eliminate preparing one hundred and twenty project-specific decision documents; and (3) Eliminate writing seventy-five closure description documents for hazardous waste unit closure and corrective actions.

Foss, D. L.; Stevens, J. L.; Gerdeman, F. W.

2002-02-25T23:59:59.000Z

485

Nuclear Safety Research and Development Program Operating Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating...

486

Accelerator Operations and Technology, AOT: LANL  

NLE Websites -- All DOE Office Websites (Extended Search)

ADE Accelerator and Operations Technology, AOT ADE Accelerator and Operations Technology, AOT About Us AOT Home Groups Accelerator, Beam Science High Power Electrodynamics Instrumentation, Controls Mechanical Design Engineering Operations Radio Frequency Engineering CONTACTS Division Leader John Erickson Deputy Division Leader for Operations Martha Zumbro Deputy Division Leader for Technology Subrata Nath Administrator Jean N. Trujillo Phone: (505) 665-2683 Put a short description of the graphic or its primary message here Accelerator and Operations Technology The Accelerator and Operations Technology (AOT) Division at Los Alamos National Laboratory conducts fundamental and applied research and development needed to improve operations and operations support for the Los Alamos Neutron Science Center (LANSCE). AOT's R&D efforts include

487

15.761 Operations Management, Summer 2002  

E-Print Network (OSTI)

This course will introduce concepts and techniques for design, planning and control of manufacturing and service operations. The course provides basic definitions of operations management terms, tools and techniques ...

Rosenfield, Donald

2002-01-01T23:59:59.000Z

488

Robust scheduling in forest operations planning  

E-Print Network (OSTI)

Forest operations planning is a complex decision process which considers multiple objectives on the strategic, tactical and operational horizons. Decisions such as where to harvest and in what order over different time ...

Lim, Lui Cheng

2008-01-01T23:59:59.000Z

489

Sandia National Laboratories: SWiFT Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations SWiFT Operations wind-turbines The DOESNL SWiFT facility has three research-scale variable-speed variable-pitch modified wind turbines with full power conversion and an...

490

Store-operate-coherence-on-value  

DOE Patents (OSTI)

A system, method and computer program product for performing various store-operate instructions in a parallel computing environment that includes a plurality of processors and at least one cache memory device. A queue in the system receives, from a processor, a store-operate instruction that specifies under which condition a cache coherence operation is to be invoked. A hardware unit in the system runs the received store-operate instruction. The hardware unit evaluates whether a result of the running the received store-operate instruction satisfies the condition. The hardware unit invokes a cache coherence operation on a cache memory address associated with the received store-operate instruction if the result satisfies the condition. Otherwise, the hardware unit does not invoke the cache coherence operation on the cache memory device.

Chen, Dong; Heidelberger, Philip; Kumar, Sameer; Ohmacht, Martin; Steinmacher-Burow, Burkhard

2014-11-18T23:59:59.000Z

491

Operational Analysis of Multiregional Nuclear Reactor Kinetics  

Science Journals Connector (OSTI)

......Operational Analysis of Multiregional Nuclear Reactor Kinetics NASSAR H. S. HAIDAR...analytically for a multiregional nuclear reactor whose subregions are of arbitrary...Operational Analysis of Multiregional Nuclear Reactor Kinetics NASSAU H. S. HAIDAR......

NASSAR H. S. HAIDAR

1983-05-01T23:59:59.000Z

492

Heteroazeotropic Batch Distillation Feasibility and Operation  

E-Print Network (OSTI)

Heteroazeotropic Batch Distillation Feasibility and Operation by Efstathios Skouras and distillation is the dominating unit operation for such separations. However, the presence of azeotropes and non distillation as the best suited process. Among, various techniques to enhance distillation, heterogeneous

Skogestad, Sigurd

493

FM 3-21.38 Pathfinder Operations  

E-Print Network (OSTI)

.........................................................................................2-6 Section III. CONDUCT OF OPERATIONSFM 3-21.38 Pathfinder Operations APRIL 2006 DISTRIBUTION RESTRICTION: Approved for public-21.38 Department of the Army Washington, DC, 25 April 2006 Pathfinder Operations Contents Page PREFACE

US Army Corps of Engineers

494

Independent Activity Report, Richland Operations Office - April...  

Office of Environmental Management (EM)

April 2013 Operational Awareness of a Department of Energy Richland Operations Office Fire Protection Surveillance HIAR-RL-2013-04-08 The U.S. Department of Energy (DOE)...

495

Operations monitoring concept. Consolidated Fuel Reprocessing Program  

SciTech Connect

Operations monitoring is a safeguards concept which could be applied in future fuel cycle facilities to significantly enhance the effectiveness of an integrated safeguards system. In general, a variety of operations monitoring techniques could be developed for both international and domestic safeguards application. The goal of this presentation is to describe specific examples of operations monitoring techniques as may be applied in a fuel reprocessing facility. The operations monitoring concept involves monitoring certain in-plant equipment, personnel, and materials to detect conditions indicative of the diversion of nuclear material. An operations monitoring subsystem should be designed to monitor operations only to the extent necessary to achieve specified safeguards objectives; there is no intent to monitor all operations in the facility. The objectives of the operations monitoring subsystem include: verification of reported data; detection of undeclared uses of equipment; and alerting the inspector to potential diversion activities. 1 fig.

Kerr, H.T.

1985-01-01T23:59:59.000Z

496

Utility Systems Management and Operational Optimization  

E-Print Network (OSTI)

The provision of an adequate and reliable supply of utilities (fuel, steam and power) represents a significant operating cost for many industrial companies. For many industries, the energy/utilities cost is the largest operating expense after...

Dhole, V.; Seillier, D.; Garza, K.

497

Automated Operating Procedures for Transfer Limits  

E-Print Network (OSTI)

Automated Operating Procedures for Transfer Limits Final Project Report Power Systems Engineering · Illinois · Iowa State · Texas A&M · Washington State · Wisconsin Automated Operating Procedures

498

Complex Technical System Operation Processes Identification  

Science Journals Connector (OSTI)

The methods of identification of the operation processes of complex technical systems are presented. These are methods and procedures ... for estimating the unknown basic parameters of the system operation proces...

Krzysztof Ko?owrocki; Joanna Soszy?ska-Budny

2011-01-01T23:59:59.000Z

499

Improving Unit Operations-Test Station Performance  

E-Print Network (OSTI)

) usage. The basic concept evaluates the varying criterias affecting these elements and their direct impact on production/test station operating costs. Second consideration explores other methods available to enhance mechanical compatibility with operator...

Filak, J. J. Jr.

500

SPECTRAL THEORY FOR JACOBI OPERATORS A Dissertation  

E-Print Network (OSTI)

of a given semi-bounded back- ground Jacobi operator and the double commutation method which inserts eigen- values into arbitrary spectral gaps. Moreover, we prove unitary equivalence of the commuted operators

Teschl, Gerald