Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Operation of a steam hydro-gasifier in a fluidized bed reactor  

E-Print Network (OSTI)

OPERATION OF A S T E A M HYDRO-GASIFIER IN A FLUIDIZED BEDMaterial Using Self-Sustained Hydro- Gasification." [0011]the process, using a steam hydro-gasification reactor (SHR)

Park, Chan Seung; Norbeck, Joseph N.

2008-01-01T23:59:59.000Z

2

Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint  

DOE Green Energy (OSTI)

The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

2013-05-01T23:59:59.000Z

3

Microsoft PowerPoint - Entergy-Hydro-Operations_Smethers [Compatibilit...  

NLE Websites -- All DOE Office Websites (Extended Search)

t l 2010 Pl Fl d P l Minimum Power Pool 535 7 p 2010 Actual 2010 Plan Flood Pool Weekly Hydro Analysis * Ted Smethers prepares analysis for EMO * Standard set of schedules * How...

4

A Comparison of Canadian and U.S. Hydro Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Phase 1 of the Comparison of Canadian & American Hydro Operations & Maintenance Practices project indicates that hydroelectric plants in Canada have significantly lower operations and maintenance (O&M) costs than those in the United States. Phase 2, focused on a more in-depth investigation, will begin as soon as permission is granted by the respective plant owners.

1997-12-22T23:59:59.000Z

5

Optimizing hourly hydro operations at the Salt Lake City Area integrated projects  

DOE Green Energy (OSTI)

The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western`s net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western`s purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western`s net revenue is computed.

Veselka, T.D.; Hamilton, S. [Argonne National Lab., IL (United States); McCoy, J. [Western Area Power Administration, Salt Lake City, UT (United States)

1995-06-01T23:59:59.000Z

6

Operation of a steam hydro-gasifier in a fluidized bed reactor  

E-Print Network (OSTI)

Using Self-Sustained Hydro- Gasification." [0011] In aprocess, using a steam hydro-gasification reactor (SHR) thepyrolysis and hydro-gasification in a single step. This

Park, Chan Seung; Norbeck, Joseph N.

2008-01-01T23:59:59.000Z

7

Hydro-ball in-core instrumentation system and method of operation  

DOE Patents (OSTI)

A hydro-ball in-core instrumentation system employs detector strings each comprising a wire having radiation sensitive balls affixed diametrically at spaced positions therealong and opposite tip ends of which are transportable by fluid drag through interior passageways. In the passageways primary coolant is caused to flow selectively in first and second opposite directions for transporting the detector strings from stored positions in an exterior chamber to inserted positions within the instrumentation thimbles of the fuel rod assemblies of a pressure vessel, and for return. The coolant pressure within the detector passageways is the same as that within the vessel; face contact, disconnectable joints between sections of the interior passageways within the vessel facilitate assembly and disassembly of the vessel for refueling and routine maintenance operations. The detector strings may pass through a very short bend radius thereby minimizing space requirements for the connections of the instrumentation system to the vessel and concomitantly the vessel containment structure. Improved radiation mapping and a significant reduction in potential exposure of personnel to radiation are provided. Both top head and bottom head penetration embodiments are disclosed.

Tower, Stephen N. (Washington Township, Westmoreland County, PA); Veronesi, Luciano (O' Hara Township, Allegheny County, PA); Braun, Howard E. (Pittsburgh, PA)

1990-01-01T23:59:59.000Z

8

Operation of a steam hydro-gasifier in a fluidized bed reactor  

E-Print Network (OSTI)

of the process, using a steam hydro-gasification reactor (simultaneously in the presence of both hydrogen and steam toundergo steam pyrolysis and hydro-gasification in a single

Park, Chan Seung; Norbeck, Joseph N.

2008-01-01T23:59:59.000Z

9

Operation of a steam hydro-gasifier in a fluidized bed reactor  

E-Print Network (OSTI)

OF A S T E A M HYDRO-GASIFIER IN A FLUIDIZED BED REACTOROF A S T E A M HYDRO-GASIFIER IN A FLUIDIZED BED REACTOR F Iis fed into a hydro-gasifier reactor. One such process was

Park, Chan Seung; Norbeck, Joseph N.

2008-01-01T23:59:59.000Z

10

Operation of a steam hydro-gasifier in a fluidized bed reactor  

E-Print Network (OSTI)

GASIFIER IN A FLUIDIZED BED REACTOR Inventors: Joseph M .a steam hydro-gasification reactor (SHR) the carbonaceous0012] Fluidized bed reactors are well known and used in a

Park, Chan Seung; Norbeck, Joseph N.

2008-01-01T23:59:59.000Z

11

Flow Measurement at Hydro Facilities: Achieving Efficiency, Compliance, and Optimal Operation (TR-113584-V5)  

Science Conference Proceedings (OSTI)

Many factors can affect the performance and profitability of hydro facilities. The basis of hydroelectric power production is founded on the quantity, availability, and effective use of water. The premise of this Hydropower Technology Roundup report is that an improvement in flow measurement techniques and applications will improve hydroelectric production.

2002-01-15T23:59:59.000Z

12

Microsoft PowerPoint - Entergy-Hydro-Operations_Smethers [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

Ouachita River System Ouachita River System LAKE OUACHITA CITY OF HOT SPRINGS LAKE CATHERINE Blakely Mountain Dam LAKE HAMITLON Carpenter Dam Remmel Dam 1 OUACHITA RIVER DeGray Lake & Dam Blakely Mtn. Dam/Lake Ouachita * Built in 1955 * forms Lake Ouachita * Owned & Operated by ACOE * 2 Units - 6600 CFS * 84 MW @178 ft. Head * AGC Capable Large volume of water * Large volume of water storage * Flood Control is a project purpose 2 project purpose Lake Hamilton / Lake Catherine * 6,897 acres surface * 198 miles shoreline * 1,642 acres surface * 56 miles shoreline * 198 miles shoreline * 70% shoreline developed * 50% of shoreline developed developed * 3,863 docks * 10 270 buildings * 399 docks * 1,391 buildings * 10,270 buildings within 500 ft. of shoreline , g within 500 ft. of shoreline 3 * Highly Developed * Highly Developed

13

JGI - Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations The Operations Department sees to it that JGI has the best possible facilities and support, ensuring that its operations are conducted in accordance with the...

14

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

15

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

16

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

17

Government Operation  

Science Conference Proceedings (OSTI)

Use Cases from NBD(NIST Big Data) Requirements WG V1.0. http://bigdatawg. nist.gov/home.php. Contents. Blank Template. Government Operation ...

2013-09-07T23:59:59.000Z

18

Operations Research  

E-Print Network (OSTI)

Mar 1, 2005 ... Operations Research. Report 2005-01. On a closedness theorem. Miklós Ujvári. Marc 2005. Eötvös Loránd University of Sciences. Department ...

19

Operating Instructions  

Science Conference Proceedings (OSTI)

... The system operation is center around 3 areas of the equipment 1) Deposition chamber 2) Vaporizer 3) Chiller/cold finger ...

2013-01-18T23:59:59.000Z

20

Operations research  

Science Conference Proceedings (OSTI)

In Evita, Andrew Lloyd Webber and Tim Rice wrote: Politics, the Art of the Possible. To those of us in the operations research community, we postulate: Operations Research, the Science of Better - (i.e. better processes, better systems and better decisions). ...

William P. Pierskalla

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Operation crosscheck  

SciTech Connect

This report consists of three sections covering the three major areas of Lawrence Livermore Laboratory`s participation in Operation Crosscheck. These areas are: Diagnostic Aircraft; Radiochemical Sampling; and Device Assembly and Handling, Barbers Point. The information contained in these sections has been extracted from Crosscheck post-operation reports.

Gilbert, F. C.

1964-11-06T23:59:59.000Z

22

Operation Terminology  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Conservation Magnets require a large amount of power to control a particle beam. In order to conserve energy and money when a beam line is down, Operations will install a...

23

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

24

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

25

Total Number of Operable Refineries  

U.S. Energy Information Administration (EIA) Indexed Site

Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge Capacity (B/SD) Thermal Cracking Downstream Charge Capacity (B/SD) Thermal Cracking Total Coking Downstream Charge Capacity (B/SD) Thermal Cracking Delayed Coking Downstream Charge Capacity (B/SD Thermal Cracking Fluid Coking Downstream Charge Capacity (B/SD) Thermal Cracking Visbreaking Downstream Charge Capacity (B/SD) Thermal Cracking Other/Gas Oil Charge Capacity (B/SD) Catalytic Cracking Fresh Feed Charge Capacity (B/SD) Catalytic Cracking Recycle Charge Capacity (B/SD) Catalytic Hydro-Cracking Charge Capacity (B/SD) Catalytic Hydro-Cracking Distillate Charge Capacity (B/SD) Catalytic Hydro-Cracking Gas Oil Charge Capacity (B/SD) Catalytic Hydro-Cracking Residual Charge Capacity (B/SD) Catalytic Reforming Charge Capacity (B/SD) Catalytic Reforming Low Pressure Charge Capacity (B/SD) Catalytic Reforming High Pressure Charge Capacity (B/SD) Catalytic Hydrotreating/Desulfurization Charge Capacity (B/SD) Catalytic Hydrotreating Naphtha/Reformer Feed Charge Cap (B/SD) Catalytic Hydrotreating Gasoline Charge Capacity (B/SD) Catalytic Hydrotreating Heavy Gas Oil Charge Capacity (B/SD) Catalytic Hydrotreating Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Kerosene/Jet Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Diesel Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Other Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Residual/Other Charge Capacity (B/SD) Catalytic Hydrotreating Residual Charge Capacity (B/SD) Catalytic Hydrotreating Other Oils Charge Capacity (B/SD) Fuels Solvent Deasphalting Charge Capacity (B/SD) Catalytic Reforming Downstream Charge Capacity (B/CD) Total Coking Downstream Charge Capacity (B/CD) Catalytic Cracking Fresh Feed Downstream Charge Capacity (B/CD) Catalytic Hydro-Cracking Downstream Charge Capacity (B/CD) Period:

26

Office of Business Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations HSS Logo Office of Business Operations Reports to the Office of Resource Management Director's Message Welcome to the Office of Business Operations Richard D....

27

Operations Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Strategic Plan Updated July 2009 Operations Organization Chief Operating Officer (COO) Deputy COO Environment, Health & Safety EH&S Facilities FAC Project Management...

28

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

29

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

30

Uncertain generalized aggregation operators  

Science Conference Proceedings (OSTI)

The aim of this paper is to extend the generalized ordered weighted averaging operator and provide a new class of operators called the uncertain generalized ordered weighted averaging (UGOWA) operator. It provides a very general formulation that includes ... Keywords: Aggregation, Decision making, Generalized mean, OWA operator, Operator weights

Li-Gang Zhou; Hua-You Chen; José M. Merigó; Anna M. Gil-Lafuente

2012-01-01T23:59:59.000Z

31

Heat Transfer Operators Associated with Quantum Operations  

E-Print Network (OSTI)

Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

Ç. Aksak; S. Turgut

2010-02-03T23:59:59.000Z

32

Air Carrier Flight Operations  

E-Print Network (OSTI)

Most air carriers operate under a system of prioritized goals including safety, customer service (on-time departures and arrivals) and operating economics. The flight operations department is responsible for the safe and ...

Midkif, Alan H.

33

A conserved Parity Operator  

E-Print Network (OSTI)

The symmetry of Nature under a Space Inversion is described by a Parity operator. Contrary to popular belief, the Parity operator is not unique. The choice of the Parity operator requires several arbitrary decisions to be made. It is shown that alternative, equally plausible, choices leads to the definition of a Parity operator that is conserved by the Weak Interactions. The operator commonly known as CP is a more appropriate choice for a Parity operator.

Mark J Hadley

2004-06-24T23:59:59.000Z

34

Operating Experience Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Experience Summaries The Office of Health, Safety and Security (HSS) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information...

35

ARM - NSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The...

36

Operator pencil passing through a given operator  

E-Print Network (OSTI)

Let $\\Delta$ be a linear differential operator acting on the space of densities of a given weight $\\lo$ on a manifold $M$. One can consider a pencil of operators $\\hPi(\\Delta)=\\{\\Delta_\\l\\}$ passing through the operator $\\Delta$ such that any $\\Delta_\\l$ is a linear differential operator acting on densities of weight $\\l$. This pencil can be identified with a linear differential operator $\\hD$ acting on the algebra of densities of all weights. The existence of an invariant scalar product in the algebra of densities implies a natural decomposition of operators, i.e. pencils of self-adjoint and anti-self-adjoint operators. We study lifting maps that are on one hand equivariant with respect to divergenceless vector fields, and, on the other hand, with values in self-adjoint or anti-self-adjoint operators. In particular we analyze the relation between these two concepts, and apply it to the study of $\\diff(M)$-equivariant liftings. Finally we briefly consider the case of liftings equivariant with respect to the algebra of projective transformations and describe all regular self-adjoint and anti-self-adjoint liftings.

A. Biggs; H. M. Khudaverdian

2013-01-28T23:59:59.000Z

37

NIST: Methane Symmetry Operations  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Version History Methane Symmetry Operations. JT Hougen Optical Technology Division Gloria Wiersma ...

2010-10-05T23:59:59.000Z

38

ARM - SGP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements with the highest priority, on which the existing experimental designs are based, are regular routine observations, as specified in the ARM Program Plan, 1990 (U.S. Department of Energy 1990). Scientifically and logistically, routine operations also serve as the basis and background for all nonroutine operations, including

39

CONDUCT OF OPERATIONS (CO)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONDUCT OF OPERATIONS (CO) CONDUCT OF OPERATIONS (CO) OBJECTIVE TA-55 SST Facility NNSA ORR Implementation Plan 1 1 CO.1 The formality and discipline of operations is adequate to conduct work safely and programs are inplace to maintain this formality and discipline. (Core Requirement 13) Criteria 1. Programmatic elements of conduct of operations are in place for TA-55 SST operations. 2. The TA-55 SST operations personnel adequately demonstrate the principles of conduct ofoperations requirements during the shift performance period. Approach Record Reviews: Review procedures and other facility documents to verify compliance with conduct of operations principles. Interviews: Interview a sampling of the TA-55 SST associated personnel to validate their understanding of the conduct of operations principles (e.g., procedure usage,

40

Transforming Commercial Building Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

NSLS Operations & Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations & Engineering Electrical Equipment Controls & Diagnostics Computer Systems Power Systems Mechanical Design Mechanical Tech Utilities Vacuum Work Planning & Controls...

42

Transforming Commercial Building Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

43

Operating Procedures and Control  

Science Conference Proceedings (OSTI)

...The principal operating variables are: Distance from inner cone of oxy-fuel gas flames or from air-fuel

44

Furnace Design and Operation  

Science Conference Proceedings (OSTI)

...S. Lampman, Energy-Efficient Heat-Treating Furnace Design and Operation, Heat Treating, Vol 4, ASM Handbook, ASM International,

45

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

46

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-12-31T23:59:59.000Z

47

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-01-01T23:59:59.000Z

48

Operating Procedures Guideline  

Science Conference Proceedings (OSTI)

The intention of this report is to provide guidance for generating stations’ management and personnel striving for successful methods of developing effective operating procedures. Standard operating procedure management is used in most businesses and industries to assist in the safe and efficient operation of those companies. Effectively managing the program is essential in order to comply with mandatory regulations, maintain the highest possible level of plant integrity, minimize human ...

2012-12-12T23:59:59.000Z

49

Updated Operations Assessment Guideline  

Science Conference Proceedings (OSTI)

The Operations Assessment Guideline (OAG) can be used to assess the organization and processes of operations departments. An internal utility team or third party can use this report to guide a team composed of industry experts and members of the assessed utility. This report is an update to EPRI report 1008520, Operations Assessment Guideline, published in March 2005. This improved version includes insights gained after three years of experience with the original report.

2008-03-25T23:59:59.000Z

50

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

51

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

52

Bevalac Operations, 1989  

Science Conference Proceedings (OSTI)

This report discusses the following topics in relation to the Bevalac accelerator: accelerator technology operations summary; nuclear science; biomedical research; and publications and presentations.

Not Available

1990-06-01T23:59:59.000Z

53

SERIES B: Operations Research  

E-Print Network (OSTI)

Tokyo Institute of Technology. SERIES B: Operations ... Department of Computer Science, The University of Electro-Communications,. Chofugaoka, Chofu-Shi ...

54

Operating Oak Ridge's "Calutrons"  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Oak Ridge's "Calutrons" The following Oral History is taken from The Manhattan Project - The Birth of the Atomic Bomb in the Words of Its Creators, Eyewitnesses, and...

55

HQ - Human Resources Operations  

Energy.gov (U.S. Department of Energy (DOE))

HQs Human Recources Operations delivers services, including position management, recruitment, staffing and classification, and reduction in force at Headquarters.  Click the "Contacts" Link to find...

56

PLATO administers operator training  

SciTech Connect

Baltimore Gas and Electric Co. is committed to an in-depth training program for substation operators. For the past two years, one important part of the training program has been a computer-based educational system with a CRT touch-response graphic display that is interactive with the trainee. This system, known as PLATO, reproduces a training situation so realistic that the operator becomes completely involved with the lesson. When used for pretraining prior to substation operating experience, it provides a hands-on insight into operating practices without jeopardizing personnel or equipment, or degrading customer service.

Buehner, R.E.

1979-02-15T23:59:59.000Z

57

Operating Conditions Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

Components in Aggressive Operating Conditions Opportunity Research is active on the patent-pending technology, titled "3-Dimensional Functionally Gradient Coatings for...

58

The Emergency Response Operations  

Science Conference Proceedings (OSTI)

... ICS Incident Command System ... Trade Center Disaster: The Con Ed Substation in World ... operations, FDNY, NYPD, and fire ground positioning of ...

59

Chemistry Department Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedures (c). Laser Safety Information: (d). Chemistry Department Laser Safety Guidelines Operational Work Planning (a). Training waiver (b). Staff Shop Posting Local...

60

Operating Practices Guidebook (OPG)  

Science Conference Proceedings (OSTI)

This guidebook is a summary of current practices concerning operation, maintenance, siting, and staffing of combustion turbine, combined cycle, and cogeneration equipment. Information obtained from both utility and independent generators addresses the important issues faced by operators, project planners, and business managers.

1995-05-12T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Cloud Computing Operations Research  

Science Conference Proceedings (OSTI)

This paper argues that the cloud computing industry faces many decision problems where operations research OR could add tremendous value. To this end, we provide an OR perspective on cloud computing in three ways. First, we compare the cloud computing ... Keywords: cloud IT, cloud computing, green IT, operations research, supply chain

Ilyas Iyoob, Emrah Zarifoglu, A. B. Dieker

2013-06-01T23:59:59.000Z

62

CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of...

63

Top 100 Operators: Proved Reserves and Production, Operated vs ...  

U.S. Energy Information Administration (EIA)

Top 100 Operators: Proved Reserves and Production, Operated vs Owned, 2008 . The operator of an oil or gas field is the company responsible for the field’s ...

64

Integrated formal operations plan  

SciTech Connect

The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

1994-01-05T23:59:59.000Z

65

Atmospheric Crude Oil Distillation Operable Capacity  

Gasoline and Diesel Fuel Update (EIA)

(Barrels per Calendar Day) (Barrels per Calendar Day) Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge Capacity (B/SD) Thermal Cracking Downstream Charge Capacity (B/SD) Thermal Cracking Total Coking Downstream Charge Capacity (B/SD) Thermal Cracking Delayed Coking Downstream Charge Capacity (B/SD Thermal Cracking Fluid Coking Downstream Charge Capacity (B/SD) Thermal Cracking Visbreaking Downstream Charge Capacity (B/SD) Thermal Cracking Other/Gas Oil Charge Capacity (B/SD) Catalytic Cracking Fresh Feed Charge Capacity (B/SD) Catalytic Cracking Recycle Charge Capacity (B/SD) Catalytic Hydro-Cracking Charge Capacity (B/SD) Catalytic Hydro-Cracking Distillate Charge Capacity (B/SD) Catalytic Hydro-Cracking Gas Oil Charge Capacity (B/SD) Catalytic Hydro-Cracking Residual Charge Capacity (B/SD) Catalytic Reforming Charge Capacity (B/SD) Catalytic Reforming Low Pressure Charge Capacity (B/SD) Catalytic Reforming High Pressure Charge Capacity (B/SD) Catalytic Hydrotreating/Desulfurization Charge Capacity (B/SD) Catalytic Hydrotreating Naphtha/Reformer Feed Charge Cap (B/SD) Catalytic Hydrotreating Gasoline Charge Capacity (B/SD) Catalytic Hydrotreating Heavy Gas Oil Charge Capacity (B/SD) Catalytic Hydrotreating Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Kerosene/Jet Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Diesel Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Other Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Residual/Other Charge Capacity (B/SD) Catalytic Hydrotreating Residual Charge Capacity (B/SD) Catalytic Hydrotreating Other Oils Charge Capacity (B/SD) Fuels Solvent Deasphalting Charge Capacity (B/SD) Catalytic Reforming Downstream Charge Capacity (B/CD) Total Coking Downstream Charge Capacity (B/CD) Catalytic Cracking Fresh Feed Downstream Charge Capacity (B/CD) Catalytic Hydro-Cracking Downstream Charge Capacity (B/CD) Period:

66

Stirling machine operating experience  

Science Conference Proceedings (OSTI)

Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

Ross, B. [Stirling Technology Co., Richland, WA (United States); Dudenhoefer, J.E. [Lewis Research Center, Cleveland, OH (United States)

1994-09-01T23:59:59.000Z

67

Plant Operational Status - Pantex Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Plant Operational Status Page Content Operational Status Shift 1 - Day The Pantex Plant is open for normal operations. All personnel are to report for duty according to...

68

Quantum Operation Time Reversal  

E-Print Network (OSTI)

The dynamics of an open quantum system can be described by a quantum operation, a linear, complete positive map of operators. Here, I exhibit a compact expression for the time reversal of a quantum operation, which is closely analogous to the time reversal of a classical Markov transition matrix. Since open quantum dynamics are stochastic, and not, in general, deterministic, the time reversal is not, in general, an inversion of the dynamics. Rather, the system relaxes towards equilibrium in both the forward and reverse time directions. The probability of a quantum trajectory and the conjugate, time reversed trajectory are related by the heat exchanged with the environment.

Crooks, Gavin E

2007-01-01T23:59:59.000Z

69

Quantum Operation Time Reversal  

E-Print Network (OSTI)

The dynamics of an open quantum system can be described by a quantum operation, a linear, complete positive map of operators. Here, I exhibit a compact expression for the time reversal of a quantum operation, which is closely analogous to the time reversal of a classical Markov transition matrix. Since open quantum dynamics are stochastic, and not, in general, deterministic, the time reversal is not, in general, an inversion of the dynamics. Rather, the system relaxes towards equilibrium in both the forward and reverse time directions. The probability of a quantum trajectory and the conjugate, time reversed trajectory are related by the heat exchanged with the environment.

Gavin E. Crooks

2007-06-26T23:59:59.000Z

70

Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint  

DOE Green Energy (OSTI)

This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-10-01T23:59:59.000Z

71

Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS  

DOE Green Energy (OSTI)

This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

Hodge, B.-M.; Lew, D.; Milligan, M.

2011-07-01T23:59:59.000Z

72

Operations Research Analysts  

U.S. Energy Information Administration (EIA) Indexed Site

Operations Research Analysts Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or more of the following important functions: * Develop, design, perform, and document a broad range of analyses and studies involving current and projected energy pricing, production, supply, and distribution, and consumption * Using computer programming skills and knowledge of energy industries and markets, designs and develops math-

73

Field Operations Program  

NLE Websites -- All DOE Office Websites (Extended Search)

688 688 May 1999 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort D. V. O'Hara L. A. Slezak DOE/ID-10688 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort 1 D. V. O'Hara 2 L. A. Slezak 2 Published May 1999 Idaho National Engineering and Environmental Laboratory Automotive Systems and Technology Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Idaho Operations Office 1 INEEL/Lockheed Martin Idaho Technologies Co. 2 U.S. Department of Energy iii EXECUTIVE SUMMARY The Field Operations Program is an electric vehicle testing and evaluation program sponsored by U.S. Department of Energy and managed by the Idaho National Engineering and Environmental

74

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

75

CH Packaging Operations Manual  

Science Conference Proceedings (OSTI)

This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

Washington TRU Solutions LLC

2005-06-13T23:59:59.000Z

76

Paste Plant Operations  

Science Conference Proceedings (OSTI)

Mar 5, 2013 ... It now provides data extraction features that aggregate system ... DUBAL Carbon Plant management team defined and implemented a 3-year strategic ... how to best approach Paste Plant operating and maintenance activities.

77

Oak Ridge Operations YTO  

Office of Legacy Management (LM)

ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I - CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a...

78

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

TFA-0404) (OM-PA-I0- 062) Dear Mr. Berman: This is a revised final response from the Idaho Operations Office (DOE-ID), regarding your July 22, 2010, Freedom ofInformation Act...

79

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

(ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act...

80

APS Operational Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

physics, geology, and environmental science. The APS was built by the U.S. Department of Energy as a national user facility. This page provides access to operational statistics...

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

New Switching Operator Training  

Science Conference Proceedings (OSTI)

This Technical Update report summarizes work done on a new project, launched in 2006, that is focused on the development of training materials for apprentice and new operators. The project is part of EPRI's Switching Safety and Reliability research.

2006-12-11T23:59:59.000Z

82

Cogeneration Operational Issues  

E-Print Network (OSTI)

A great deal of the discussions concerning congeneration projects are focused on the "avoided cost" and other legal issues which effect these projects. These areas are extremely important and are essential to the success of the venture. Equally important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation operations. Other operational issues also include utility transmission planning, generation planning and fuel mix decisions. All of these operational problems have an impact on the ratepayer in regard to quality of electric service and future rates. Both the cogenerator and the utility have an interest in solving these problems.

Williams, M.

1985-05-01T23:59:59.000Z

83

Oak Ridge Operations.  

Office of Legacy Management (LM)

9 4s - 22 Department of Energy Oak Ridge Operations. SI9J>liB P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director...

84

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

1997-10-01T23:59:59.000Z

85

Cell Technology and Operation  

Science Conference Proceedings (OSTI)

Mar 14, 2012 ... The potlines are operating at 353 kA with excellent performances exceeding 96.0 % current efficiency and achieving 13.0 kWh/kgAl for more ...

86

Human Performance - Fossil Operations  

Science Conference Proceedings (OSTI)

All humans make errors. Industrial human errors can result in a loss of life and can significantly impact the productivity and cost effectiveness of any facility or company. Several industries in which human error has had a significant impact (for example, airline, medical, military, nuclear power, aviation, and chemical) have implemented human performance programs with excellent results. Human errors by fossil plant operators can easily challenge plant safety and production. In the fossil operations are...

2007-02-28T23:59:59.000Z

87

Operational Waste Volume Projection  

SciTech Connect

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

88

Storage Ring Operation Modes  

NLE Websites -- All DOE Office Websites (Extended Search)

Longitudinal bunch profile and Up: APS Storage Ring Parameters Longitudinal bunch profile and Up: APS Storage Ring Parameters Previous: Source Parameter Table Storage Ring Operation Modes Standard Operating Mode, top-up Fill pattern: 102 mA in 24 singlets (single bunches) with a nominal current of 4.25 mA and a spacing of 153 nanoseconds between singlets. Lattice configuration: Low emittance lattice with effective emittance of 3.1 nm-rad and coupling of 1%. Bunch length (rms): 33.5 ps. Refill schedule: Continuous top-up with single injection pulses occurring at a minimum of two minute intervals, or a multiple of two minute intervals. Special Operating Mode - 324 bunches, non top-up Fill pattern: 102 mA in 324 uniformly spaced singlets with a nominal single bunch current of 0.31 mA and a spacing of 11.37 nanoseconds between singlets.

89

Operations Information for Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Information for Studies Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP total customer loads for Fiscal Year 2009 (Oct, 2008-Sept, 2009) FY2010 Load Information (pdf) SLIP total customer loads for Fiscal Year 2010 (Oct, 2009-Sept, 2010) FY2011 Load Information (pdf) SLIP total customer loads for Fiscal Year 2011 (Oct, 2010-Sept, 2011) FY2012 Load Information (pdf) SLIP total customer loads for Fiscal Year 2012 (Oct, 2011-Sept, 2012) FY2013 Load Information (pdf) SLIP total customer loads for Fiscal Year 2013 (Oct, 2012-Sept, 2013) CRSP Projected Power Releases From USBR (Excel) The most recent file of projected future power releases from CRSP Dams, median projection

90

ORNL radioactive waste operations  

SciTech Connect

Since its beginning in 1943, ORNL has generated large amounts of solid, liquid, and gaseous radioactive waste material as a by-product of the basic research and development work carried out at the laboratory. The waste system at ORNL has been continually modified and updated to keep pace with the changing release requirements for radioactive wastes. Major upgrading projects are currently in progress. The operating record of ORNL waste operation has been excellent over many years. Recent surveillance of radioactivity in the Oak Ridge environs indicates that atmospheric concentrations of radioactivity were not significantly different from other areas in East Tennesseee. Concentrations of radioactivity in the Clinch River and in fish collected from the river were less than 4% of the permissible concentration and intake guides for individuals in the offsite environment. While some radioactivity was released to the environment from plant operations, the concentrations in all of the media sampled were well below established standards.

Sease, J.D.; King, E.M.; Coobs, J.H.; Row, T.H.

1982-01-01T23:59:59.000Z

91

GNF2 Operating Experience  

Science Conference Proceedings (OSTI)

GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChem{sup TM} and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate the adequacy/expected behavior of the design. (authors)

Schardt, John [GE Energy, Nuclear, 3901 Castle Hayne Road, Wilmington, NC 28402 (United States)

2007-07-01T23:59:59.000Z

92

TRIGA reactor operating experience  

SciTech Connect

The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections.

Anderson, T.V. [Oregon State University, Corvallis, OR (United States)

1970-07-01T23:59:59.000Z

93

Applications: Operational wind turbines  

E-Print Network (OSTI)

Capability Applications: Operational wind turbines Benefits: Optimize wind turbine performance Summary: Researchers at the Los Alamos National Laboratory (LANL) Intelligent Wind Turbine Program are developing a multi-physics modeling approach for the analysis of wind turbines in the presence of realistic

94

REACTOR OPERATIONS AND CONTROL  

E-Print Network (OSTI)

of Neural Networks to the Operations of Nuclear Power Plants," Nucl. Safety, 32, 68 ~1991!. 3. I. PÁZSIT detectors.1 According to the technical specifications of the Ring- hals power plant, in which this work and the "distorted" axial flux shape, and from the latter, *Current address: The Swedish Nuclear Power Inspectorate

Pázsit, Imre

95

NUCLEAR PLANT OPERATIONS AND  

E-Print Network (OSTI)

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics: Swedish Nuclear Power Inspectorate SE- 10658 Stockholm, Sweden. NUCLEAR TECHNOLOGY VOL. 131 AUG. 2000 239 by the Swedish Nuclear Power Inspectorate, contract 14.5-980942-98242. REFERENCES 1. A. M. WEINBERG and H. C

Pázsit, Imre

96

Operator strength reduction  

Science Conference Proceedings (OSTI)

Operator strength reduction is a technique that improves compiler-generated code by reformulating certain costly computations in terms of less expensive ones. A common case arises in array addressing expressions used in loops. The compiler can replace ... Keywords: loops, static single assignment form, strength reduction

Keith D. Cooper; L. Taylor Simpson; Christopher A. Vick

2001-09-01T23:59:59.000Z

97

Designing intelligent healthcare operations  

Science Conference Proceedings (OSTI)

Effective decision making is vital in all healthcare activities. While this decision making is typically complex and unstructured, it requires the decision maker to gather multi-spectral data and information in order to make an effective choice when ... Keywords: healthcare operations, intelligence continuum, knowledge management, multi agent systems

Nilmini Wickramasinghe; Christian Guttmann; Jonathan Schaffer

2009-12-01T23:59:59.000Z

98

Quantum Operations and Measurement  

E-Print Network (OSTI)

Quantum Operations and Measurement M.P Seevinck E-mail: M.P.Seevinck@phys.uu.nl Utrecht field in quantum physics ­ or perhaps better, a new way of doing quantum physics ­ . . . Surprisingly of these developments to the conceptual problems of quantum mechanics. In our view, the new work on quantum information

Seevinck, Michiel

99

Quantum Operations and Measurement  

E-Print Network (OSTI)

Quantum Operations and Measurement # M.P Seevinck # E­mail: M.P.Seevinck@phys.uu.nl Utrecht in quantum physics -- or perhaps better, a new way of doing quantum physics -- . . . Surprisingly, with few to the conceptual problems of quantum mechanics. In our view, the new work on quantum information changes

Seevinck, Michiel

100

Measurement of autonomous operation  

Science Conference Proceedings (OSTI)

While robotic systems and the field of Artificial Intelligence (AI) have been funded through the Department Of Defense (DoD) and Industry for decades, it was not until recent years that the combination of these two technologies has made truly significant ... Keywords: C4ISR, automated decision aid (ADA), autonomous control, autonomous operations, unmanned aerial system

W. Hamel

2010-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

PP-89-1 Bangor Hydro-Electric Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-89-1 Bangor Hydro-Electric Company PP-89-1 Bangor Hydro-Electric Company Presidental permit authorizing Bangor Hydro-Electric Company to construc, operate and maintain electric...

102

PP-89-1 Bangor Hydro-Electric Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 Bangor Hydro-Electric Company PP-89-1 Bangor Hydro-Electric Company Presidental permit authorizing Bangor Hydro-Electric Company to construc, operate and maintain electric...

103

Top 100 Operators: Proved Reserves and Production, Operated vs ...  

U.S. Energy Information Administration (EIA)

The operator of an oil or gas field is the company ... Operators in the United States are obligated to ... Reserves Production Reserves Production ...

104

CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations - Y-12 Enriched Uranium Operations Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January, 2005 assessment of Conduct of Operations program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility More Documents & Publications CRAD, DOE Oversight - Y-12 Enriched Uranium Operations Oxide Conversion

105

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

106

Nevada Operations Office  

Office of Legacy Management (LM)

Nevada Operations Office Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified as the location of the subject liquid wastes. Numerous readings were made with a hand-held Ludlum Model 125 Micro-R meter, for the purpose of personnel radiation protection walking into the controlled, posted radioactive waste compounds. No readings were above background.

107

Improve your operations training  

Science Conference Proceedings (OSTI)

Operators need problem-solving expertise that allows them to successfully restore the system online. But they should also understand how what they did worked, and why. The method for this is process logic (PL). PL is a common-sense, efficient method of problem solving using an if-them deductive-reasoning approach to discover root cause of system upsets. PL procedures in troubleshooting call for the operator to: examine all effects; separate logical (expected) changes from unexpected; identify and tag unique set(s) of thumbprints; determine source of thumbprints (i.e. originating component); locate original change in said component; verify root cause change; devise appropriate corrective action plan; and implement corrective action. Several examples illustrate this method for troubleshooting.

Swain, J.H.; Maddux, M. (K and S Associates, Texas City, TX (United States))

1994-12-01T23:59:59.000Z

108

Operations Improvement Surveys  

E-Print Network (OSTI)

Exxon Chemical Company developed unique site-wide energy optimization technology in the mid1970's. This technology was applied by means of site energy surveys which were carried out at every major Exxon facility throughout the world during the 1976-1981 timeframe. The first 20% of energy savings, versus the 1972 reference, had already been captured or was in progress via conventional energy conservation methods. The site energy surveys identified attractive investments to save a second 20% of energy use. In early 1982, Exxon Corp. started to apply this same technology to its major facilities to define attractive NO INVESTMENT and LOW INVESTMENT operational improvement savings which could be implemented quickly. This presentation covers Exxon's approach to site energy optimization and the Operations Improvement Survey Program. The Program has identified at many sites, an average of 5% reduction in today's energy costs at No/Low investment plus additional savings in the feedstock and energy supply areas.

Guide, J. J.; O'Brien, W. J.

1984-01-01T23:59:59.000Z

109

SURVEY OF FALLOUT OPERATIONS  

SciTech Connect

A survey was made of fall-out operations in the various countries of the world, These operations are outlined by country. The source of information has largely been the reports submitted to UNSCEAR forwarding data for their consideration. In addition, some material has been received directly in exchange for HASL Quarterlies and other publications of the Laboratory. In many cases, responsible scientists from the country concerned have reviewed the sheets and have made corrections. All of the programs that are shown have been and are subject to modification as time goes on, thus, the data indicate the status of the program as of 1961. No attempt has been made to list re search projects or special fall-out measurements and only programs of a continuing nature have been covered. (auth)

1962-07-01T23:59:59.000Z

110

User Operation Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS-NSSD-TOF-TD-0002 - R00 SNS-NSSD-TOF-TD-0002 - R00 1 SEQUOIA Operations Manual for Users G.E. Granroth SEQUOIA Lead Instrument Scientist A.I. Kolesnikov SEQUOIA Instrument Scientist L.M. DeBeer-Schmitt SEQUOIA Scientific Associate T.E. Sherline Sample Environment Scientist Revised - May 13, 2013 SNS-NSSD-TOF-TD-0002 - R00 2 Abstract The SEQUOIA Operations Manual for Users presents a description of the SEQUOIA spectrometer located at beamline 17 (BL17) of the Spallation Neutron Source (SNS). It is the intent of this manual to inform the user regarding the SEQUOIA spectrometer and available sample environment, to run experiments, to access and analyze the collected data, and to provide the user with other potentially useful information. The first section serves to describe the components of which the instrument is comprised.

111

War Gaming Peace Operations  

Science Conference Proceedings (OSTI)

Today's military personnel fight against and work with a diverse variety of nonstate actors, from al-Qaeda terrorists to major nongovernmental organizations who provide vital humanitarian assistance. Furthermore, the nontraditional battle spaces where ... Keywords: Afghanistan, NGOs, active learning, board game, course of action, culture, curriculum, facilitator, faith-based, humanitarian, humanitarian assistance, indeterminacy, index, intelligence, kinetic, military, negotiations, operations, post-conflict, provincial reconstruction, random events, relationships, religion, religious, stability, terrorists, war game for peace

Roger Mason, Eric Patterson

2013-02-01T23:59:59.000Z

112

Climate Data Operators (CDO)  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 3/4, GRIB including SZIP compression, EXTRA, SERVICE and IEG are supported as IO-formats. Apart from that cdo can be used to analyse any kind gridded data not related to climate science. CDO has very small memory requirements and can process files larger than the physical memory. How to Use CDO module load cdo cdo [Options] Operators ... Further Information CDO Online Documentation Availability Package Platform Category Version Module Install Date Date Made Default cdo carver libraries/ I/O 1.4.1 cdo/1.4.1 2012-01-13 2012-01-13 cdo carver libraries/ I/O 1.4.6 cdo/1.4.6 2012-05-24 2012-05-25 cdo carver libraries/ I/O 1.6.1 cdo/1.6.1 2013-07-02

113

Operational health physics training  

SciTech Connect

The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

NONE

1992-06-01T23:59:59.000Z

114

Operated device estimation framework  

E-Print Network (OSTI)

Protective device estimation is a challenging task because there are numerous protective devices present in a typical distribution system. Among various protective devices, auto-reclosers and fuses are the main overcurrent protection on distribution systems. Operation of a protective device in response to a particular fault condition depends upon the protective device’s operating behavior and coordination of various such protective devices. This thesis presents the design and implementation of a protective device estimation algorithm which helps in identifying which protective devices have operated to clear a short circuit condition. The algorithm uses manufacturer’s device details, power quality data measured from substation monitoring devices and power system event features estimated using existing DFA algorithms. The proposed technique can be used to evaluate coordination of these protective devices and helps in locating a fault in a distribution system feeder. This approach is independent of feeder topology and could be readily used for any distribution system. The effectiveness of this algorithm is verified by simulated and actual test data. Suggestions are included for future research and application by electric utilities.

Rengarajan, Janarthanan

2008-12-01T23:59:59.000Z

115

HEV Fleet Testing Operating Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

calculated for this figure using mass air flow over dynamic vehicle operation. 2006 Toyota Highlander Hybrid Final Fleet Testing Results Operating Performance Cumulative MPG 1 :...

116

HEV Fleet Testing Operating Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

calculated for this figure using mass air flow over dynamic vehicle operation. 2007 Toyota Camry Hybrid Final Fleet Testing Results Operating Performance Cumulative MPG 1 : 33.6...

117

What is an accelerator operator?  

NLE Websites -- All DOE Office Websites (Extended Search)

is an accelerator operator? First I'll explain the education one must have in order to be considered for an Accelerator Operator position. Jefferson Lab's typical Accelerator...

118

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

119

IBRD Operational Decision Framework  

SciTech Connect

The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

Greenwalt, R; Hibbard, W; Raber, E; Carlsen, T; Folks, K; MacQueen, D; Mancieri, S; Bunt, T; Richards, J; Hirabayashi-Dethier, J

2010-11-12T23:59:59.000Z

120

INDEPENDENT ELECTRICITY SYSTEM OPERATOR  

E-Print Network (OSTI)

The Board of Directors of the Independent Electricity System Operator (IESO) has adopted this Charter as part of its commitment to high standards of corporate governance in pursuing the objects of the IESO set out in the Electricity Act, 1998. This Charter describes the Board’s mandate, accountability and composition, and sets out a specific Code of Conduct for the Board. More detailed information about the IESO’s corporate governance is set out in the Governance and Structure By?law and in corporate policies, notably the Terms of Reference for a Director. The activities of the Board and its Committees are formally recorded in minutes of meetings. MANDATE The Board shall manage and supervise the management of the IESO’s business and affairs and shall provide insight, input into and oversight of the development of the IESO’s strategic direction. More specifically, the Board’s mandate includes: periodically reviewing with Management: the strategic environment; the emergence of new risks and opportunities and the implications of such risks and opportunities for the IESO’s strategic direction; and the establishment and operation of the IESO?administered markets to promote the purposes of the Electricity Act, 1998 including, without limitation, making market rules and amendments thereto; approving strategic plans that take into account the IESO’s major risks and opportunities and overseeing the management of those risks; 2 appointing, monitoring and assessing the performance of the Chief Executive

unknown authors

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Operating experience at CEBAF  

Science Conference Proceedings (OSTI)

CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 {mu}A CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-{mu}A CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5{times}10{sup -5} and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results from commissioning and operations experience since the last conference are presented.

Legg, R.

1996-07-01T23:59:59.000Z

122

Extending quantum operations  

SciTech Connect

For a given set of input-output pairs of quantum states or observables, we ask the question whether there exists a physically implementable transformation that maps each of the inputs to the corresponding output. The physical maps on quantum states are trace-preserving completely positive maps, but we also consider variants of these requirements. We generalize the definition of complete positivity to linear maps defined on arbitrary subspaces, then formulate this notion as a semidefinite program, and relate it by duality to approximative extensions of this map. This gives a characterization of the maps which can be approximated arbitrarily well as the restriction of a map that is completely positive on the whole algebra, also yielding the familiar extension theorems on operator spaces. For quantum channel extensions and extensions by probabilistic operations we obtain semidefinite characterizations, and we also elucidate the special case of Abelian inputs or outputs. Finally, revisiting a theorem by Alberti and Uhlmann, we provide simpler and more widely applicable conditions for certain extension problems on qubits, and by using a semidefinite programming formulation we exhibit counterexamples to seemingly reasonable but false generalizations of the Alberti-Uhlmann theorem.

Heinosaari, Teiko [Turku Centre for Quantum Physics, Department of Physics and Astronomy, University of Turku (Finland); Jivulescu, Maria A. [Department of Mathematics, University Politehnica Timisoara, 300006 Timisoara (Romania); Reeb, David; Wolf, Michael M. [Department of Mathematics, Technische Universitaet Muenchen, 85748 Garching (Germany)

2012-10-15T23:59:59.000Z

123

Program Operations Plan  

SciTech Connect

The Department of Energy's Atmospheric Chemistry Program (ACP) was initiated in 1991 to coordinate DOE's university and federal-laboratory atmospheric-chemistry research, and to focus these efforts on national and international information requirements in the atmospheric-chemistry field. This Program Operations Plan describes the structure and vision of the effort designed to fulfill these needs, and is divided into two major components. The first of these is a Strategic Plan, which outlines the ACP's rationale, objectives, and vision, and describes its products that are anticipated over a future ten-year period. Although based on realistic appraisals of goals that are attainable given the financial, material, and intellectual resources of the ACP community, this Strategic Plan does not describe these resources themselves. The second component of the Program Operations Plan, the Implementation Plan, deals directly with these resource considerations. As such it focuses on practical implementation of Strategic-Plan elements at the individual research institutions, the anticipated scientific contributions of these groups, and their coordination within the ACP. In contrast to the Strategic Plan, this Implementation Plan extends only five years into the future.

1993-04-01T23:59:59.000Z

124

Mobile marine operations structure  

SciTech Connect

This patent describes the process of installing a marine operations structure in a pre-determined sea floor location. The structure has a central core and a support base having at least two differently sloped ice wall surfaces for achieving fracturing of ice features, and having at least two series of circumferentially arranged ballast tanks. It consists of positioning the structure over a selected sea floor location by the use of at least three tug boats connected to the structure by tension cables arranged radially with respect to the structure; flooding a first series of lower ballast tanks in a sequential ballasting operation; flooding a second series of ballast tanks located at a higher elevation within the structure than the first series of ballast tanks; maintaining radial forces along the tension cables during the flooding steps; and after the structure has become founded on the bottom of the sea, pumping sea waver into fluid tanks some of which are located at an elevation above the water level.

Bhalaik, A.; Braddick, P.W.; Brittin, D.S.; Johnson, G.L.

1987-09-22T23:59:59.000Z

125

Digital Operating Experience in the Republic of Korea  

Science Conference Proceedings (OSTI)

This report documents an investigation of digital system operating experience in Korea Hydro Nuclear Power (KHNP) nuclear plants, with a focus on events in which software common-cause failure (CCF) was or could have been a significant factor. CCF remains an unsettled technical and regulatory issue, both for new plants and for digital upgrades at operating plants. The concern is the potential for CCFs to disable multiple equipment trains or systems that use identical software-based components.

2011-11-22T23:59:59.000Z

126

TYPE OF OPERATION  

Office of Legacy Management (LM)

Owner c:ontacted Owner c:ontacted TYPE OF OPERATION ----------------_ jJ Research & Development 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process i Theoretical Studies Sample & Analysis B Production 0 Disposal/Storage $r Prime 0 Subcontract& 0 Purchase Order 0 Facility Type 0 Manufacturing 0 University 0 Research Organization a Other information (i.e., cost + fixed fern, unit price,' time & mate ~r~~-r~~tf~-_~_-_~-~f-~~J~ d ial, etc)_kl/Jlfits ---- -7---- -- Contract/Purchase Order # w?@7-e?-b $ 6, i;,_~~~~~----------------- - ----- C_O!!IF!KXYE-PEELEg: -lTlL-/L?~J --------------------------- OWNERSHXP: AEWHEC AEC/HED' GOVT GB' JT SiXiRACTOR CONiRkCiGR WEE LEAs_EE a!!!%? IEEE!? --------_ ..---LEASED ._ OWNED LANDS BUILDINGS EQUIPMENT

127

TYPE OF OPERATION  

Office of Legacy Management (LM)

OWNEF? (S) OWNEF? (S) Current: ____ LcrcJksLG! _________ Owner contacted n yes WI-IO; if yes, date contacted-- TYPE OF OPERATION ----_-------_---- m Research & Development Cl Pilot Scale Cl Disposal/Storaqe TYPE OF CDNTRACT ---__------__--- q Prime 0 Subcnntractor Cl Purchase Order 0 Other infcrmation (i.e., cnst + fixed fee, unit price, time 84 materi+, e.tc) v-7Y07-&G-W ---------------------------- Contract/Pur&aae Order # 0 -?+7- FJc-(CL --___--------~----_______________ CONTRACTING PEXIOD: fl& ,&I;'"'-?;': (&e-?)_-- ' ------------------ OWNERSHIP: AEC/MED GEC/MED SOVT GOVT CONTRACTOR CCNTRACTOR OWNE3 LEASE3 OWNE3 LEASED OWNE3 ----- ------ ----- ------ -__------- LE.352 LANDS u u q BUILDINGS EQUIPMENT 0 FINAL PRODUCT WASTE G RESIDUE a

128

TYPE OF OPERATION  

Office of Legacy Management (LM)

3!NEEi_S1 3!NEEi_S1 past: -~~~-~~~~~-~~~---------- current: ------------_------------- Owner contacted q yes g no; if ye=, date contacted TYPE OF OPERATION --~~__--~-~~~---- 5 Research & Development 5 Facility Type 0 Production scale testing c1 Pilot Scale 0 Bench Scale Process z Theareti cal Studi es Sample Sr Analysis 0 Production D Disposal/Storage TYPE OF CONTRACT ---------------- 0 Manufacturing 0 University 0 Research Clrganization B Government Cpanaored Faci 1 i ty 0 Other ~~---~~---_--~~-----_ a Prime 13 Subcontract& D PurcSase Order 0 Other information (i.e., cost + fixed fee, unit price, time & material, +z) ----_----------------------- Cantract/Purchaae Order #-d-z=&-/) -2_7~-------------Is_------------ PERIOD: CONTRACTING I%~(?) - 1465

129

Albuquerque Operations Office  

Office of Legacy Management (LM)

%r © J~4 %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from inactive uranium mill sites. Evaluation of your property identified above has revealed the presence of residual radioactive material in excess of standards established by the Environmental Protection Agency (EPA). Therefore, your property has been formally included by DOE for remedial action in the Uranium Mill Tailings

130

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

131

RHIC Polarized proton operation  

DOE Green Energy (OSTI)

The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D'Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

2011-03-28T23:59:59.000Z

132

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 1 Safety Solutions and Pollution Prevention Proposals Congratulations to Barbara Roland of the Nonproliferation and National Security Dept.! Barbara's Safety Solution proposal has been funded. To improve personnel safety in Building 197 during emergency situations, she suggested that pathway markers be positioned on the hallway walls to help locate the Indoor Assembly Areas and Evacuation routes. Light mo- tion detectors for "common areas" in several of our buildings was also funded. This idea sprung from a suggestion received during our Director- ate Safety Stand Down in 2009. This will improve safety and conserve energy too. Remember to send us your suggestions for next year!

133

Operation Diagnostics: Use of Visualization Techniques and Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Diagnostics: Use of Visualization Techniques and Operation Operation Diagnostics: Use of Visualization Techniques and Operation Patterns to Verify and Optimize Dynamic Building and System Operation Speaker(s): Oliver Baumann Date: December 7, 2004 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Peng Xu Building automation systems (BAS) and building energy management systems (BEMS) have been used in modern edifices for the last 2 decades. These systems measure, process, and monitor a huge amount of data to operate the building and systems more or less properly. Often, the data is only used to signal failures or break-downs of systems or components. Further information of the data to analyze and diagnose the building operation is not used due to the lack of analysis methods and tools. Within the Operation Diagnostics, different visualization techniques are applied to

134

Top 100 Operators: Proved Reserves and Production, Operated vs...  

Annual Energy Outlook 2012 (EIA)

Total Operators: Roughly 14,000 Natural Gas: 252 Tcf (89% of U.S. Total) Source: U.S. Energy Information Administration Top 100 Operators: Proved Reserves and Production,...

135

LCLS Operating Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

136

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

October, 2011 October, 2011 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 2 October is National Fire Safety Month Did you know that Fire Prevention Week was established to commemorate the Great Chicago Fire, the tragic 1871 conflagration that killed more than 250 people, left 100,000 homeless, destroyed more than 17,400 structures and burned more than 2,000 acres. The fire began on October 8, but continued into and did most of its damage on October 9, 1871. According to popular legend, the fire broke out after a cow - belonging to Mrs. Catherine O'Leary - kicked over a lamp, setting first the barn, then the whole city on fire. While the Great Chicago Fire was the best-known blaze to start during this fiery two-day stretch,

137

INDEPENDENT ELECTRICITY SYSTEM OPERATOR  

E-Print Network (OSTI)

adopted this Charter as part of its commitment to high standards of corporate governance in pursuing the objects of the IESO set out in the Electricity Act, 1998. This Charter describes the Board’s mandate, accountability and composition, and sets out a specific Code of Conduct for the Board. More detailed information about the IESO’s corporate governance is set out in the Governance and Structure By-law and in corporate policies, notably the Terms Of Reference for A Director. The activities of the Board and its Committees are formally recorded in minutes of meetings. MANDATE The Board shall supervise the management of the IESO’s business and affairs and shall take a leadership role in the development of the IESO’s strategic direction. More specifically, the Board’s mandate includes: regularly reviewing with Management: the strategic environment, the emergence of new risks and opportunities and the implications for strategic direction; and the establishment and operation of the IESO-administered markets to promote the

unknown authors

2005-01-01T23:59:59.000Z

138

Third Northeast Regional Operational Workshop  

Science Conference Proceedings (OSTI)

The Third Northeast Regional Operational Workshop, focusing on hydrometeorology in the northeastern United States, was held 6-7 November 2001 in Albany, New York. Sessions covered cold season events, warm season events, modeling,and operational ...

Eugene P. Auciello

2002-07-01T23:59:59.000Z

139

Singular operators in multiwavelet bases  

Science Conference Proceedings (OSTI)

We review some recent results on multiwavelet methods for solving integral and partial differential equations and present an efficient representation of operators using discontinuous multiwavelet bases, including the case for singular integral operators. ...

G. Fann; G. Beylkin; R. J. Harrison; K. E. Jordan

2004-03-01T23:59:59.000Z

140

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

September 10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho...

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Operations Analysis - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

9700 S. Cass Avenue Argonne, IL 60439 (630) 252-1148 office (630) 252-5703 FAX gfystro@aps.anl.gov Areas of interest Operator training program development Operations Group Wiki...

142

Closure operators for order structures  

Science Conference Proceedings (OSTI)

We argue that closure operators are fundamental tools for the study of relationships between order structures and their sequence representations. We also propose and analyse a closure operator for interval order structures.

Ryszard Janicki; Dai Tri Man Lê; Nadezhda Zubkova

2009-09-01T23:59:59.000Z

143

Hanford Identification (HID) PIA, Richland Operations Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations...

144

PNNL Electricity Infrastructure Operations Center | Open Energy...  

Open Energy Info (EERE)

Electricity Infrastructure Operations Center Jump to: navigation, search Logo: Electricity Infrastructure Operations Center Name Electricity Infrastructure Operations Center...

145

Hanford Identification (HID) PIA, Richland Operations Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office...

146

Cell Operations and Process Control  

Science Conference Proceedings (OSTI)

Mar 5, 2013 ... Aluminum Reduction Technology: Cell Operations and Process Control Sponsored by: TMS Light Metals Division, TMS: Aluminum Committee

147

Operational Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Operational Management Aviation Management Executive Secretariat Energy Reduction at HQ Facilities and Infrastructure Federal Advisory Committee Management Freedom of...

148

Strategies for Sustainable Institute Operations  

Science Conference Proceedings (OSTI)

... 2 ? What we heard and read: ? NNMI RFI Responses to sustainability questions ... Blueprint for Action: Sustainable Operations Outline Page 3. ...

2013-01-23T23:59:59.000Z

149

Idle Operating Total Stream Day  

U.S. Energy Information Administration (EIA) Indexed Site

3 3 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 11 10 1 1,293,200 1,265,200 28,000 1,361,700 1,329,700 32,000 ............................................................................................................................................... PAD District I 1 1 0 182,200 182,200 0 190,200 190,200 0 ................................................................................................................................................................................................................................................................................................ Delaware......................................

150

DOE, Invensys Operations Management to Develop, Deploy Operator Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, Invensys Operations Management to Develop, Deploy Operator DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants December 10, 2012 - 12:00pm Addthis Washington, DC - A new U.S. Department of Energy (DOE) cooperative research and development agreement to develop, test, and deploy a dynamic simulator and operator training system (OTS) could eventually help commercialize important carbon capture technologies at the nation's power plants. The high-fidelity, real-time OTS for a generic supercritical once-through (SCOT) pulverized-coal power plant will be installed at the National Energy Technology Laboratory's (NETL's) Advanced Virtual Energy Simulation

151

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

152

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

153

Operating Reserves and Variable Generation  

DOE Green Energy (OSTI)

This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

Ela, E.; Milligan, M.; Kirby, B.

2011-08-01T23:59:59.000Z

154

An Operating Raphael A. Finkel  

E-Print Network (OSTI)

An Operating Systems Vade Mecum Raphael A. Finkel University of Wisconsin at Madison Prentice Hall'') is a laboratory manual that guides the student step by step through complex procedures. Operating systems in operating systems at the undergraduate level. The subject has so many individual parts that its

Finkel, Raphael

155

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

156

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

157

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

158

Hydro Relicensing Forum: Relicensing Strategies, National Review Group Interim Publication  

Science Conference Proceedings (OSTI)

As part of its Hydro Relicensing Forum, EPRI convened a National Review Group to improve hydroelectric relicensing outcomes through a neutral dialogue between hydro operators, government agencies, tribes, and non-governmental organizations (NGOs).

2000-12-21T23:59:59.000Z

159

Hydro Relicensing Forum: Relicensing Strategies National Review Group Interim Publication  

Science Conference Proceedings (OSTI)

As part of its Hydro Relicensing Forum, EPRI convened a National Review Group to improve hydroelectric relicensing outcomes through a neutral dialogue between hydro operators, government agencies, tribes, and non-governmental organizations.

2000-02-29T23:59:59.000Z

160

Operations | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

162

Accelerator Operators and Software Development  

SciTech Connect

At Thomas Jefferson National Accelerator Facility, accelerator operators perform tasks in their areas of specialization in addition to their machine operations duties. One crucial area in which operators contribute is software development. Operators with programming skills are uniquely qualified to develop certain controls applications because of their expertise in the day-to-day operation of the accelerator. Jefferson Lab is one of the few laboratories that utilizes the skills and knowledge of operators to create software that enhances machine operations. Through the programs written; by operators, Jefferson Lab has improved machine efficiency and beam availability. Because many of these applications involve automation of procedures and need graphical user interfaces, the scripting language Tcl and the Tk toolkit have been adopted. In addition to automation, some operator-developed applications are used for information distribution. For this purpose, several standard web development tools such as perl, VBScript, and ASP are used. Examples of applications written by operators include injector steering, spin angle changes, system status reports, magnet cycling routines, and quantum efficiency measurements. This paper summarizes how the unique knowledge of accelerator operators has contributed to the success of the Jefferson Lab control system. *This work was supported by the U.S. DOE contract No. DE-AC05-84-ER40150.

April Miller; Michele Joyce

2001-11-01T23:59:59.000Z

163

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating  

NLE Websites -- All DOE Office Websites (Extended Search)

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Costs and Societal Environmental Issues Speaker(s): Don Aumann Date: March 21, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Satkartar K. Kinney Don Aumann, a Senior Consultant from BKi in Oakland, will present an overview of two projects he completed for the electric utility industry. The first, a case study evaluation of a hybrid chiller plant in Jefferson City, Missouri, demonstrates the importance of carefully evaluating the impact of utility rate structures on plant operating costs. The building owner, another engineering consultant, and the local utility representatives were confused by the rates and missed an opportunity to cut chiller-plant operating costs by about 20%, totaling $15,000 per year. In

164

Potline Operation I: Smelter Operations - Programmaster.org  

Science Conference Proceedings (OSTI)

Mar 5, 2013 ... Low Power Operation at Aluminium Dunkerque Smelter: ... place in the substation and have limited the maximum substation capacity at 285 kA ...

165

Formal Specification ofOperating System Operations Dan ...  

Science Conference Proceedings (OSTI)

... ffl The process has privilege PV MAC CL (if ... Function setSLFileEnv models the operation of a process ... To model the arguments that are passed to ...

2013-05-07T23:59:59.000Z

166

Liens for Oil and Gas Operations (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

This section contains regulations concerning lien allowances made to operators of oil and gas operations.

167

Business Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Operations Business Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of Business Operations - Office of Budget, Office of Business Services, and Office of Information and Business Management - and their managers are outlined in the Business Operations organization chart. Offices Image of the Department of Energy Forrestal building in DC. Office of Budget The Office of Budget provides information that informs policy development and program planning, including basic market and economic data relevant to EERE's programs, market and economic analysis, estimation of the public benefits of EERE's programs, evaluation of past program performance and

168

Field Operation Power Switching Safety  

Science Conference Proceedings (OSTI)

Safety is of paramount consideration in all aspects of utility operations. Power switching operations, due to their variable nature, are susceptible to errors that can place utility workers at risk, lower system reliability or ability to respond to contingencies, increase customer outages, lower customer satisfactions, and reduce revenue. This report summarizes the results of analysis of utility data collected on human error in power switching operations and describes industry techniques used to reduce t...

1996-10-11T23:59:59.000Z

169

Operations Analysis - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Areas of interest Experiments and analysis of APS accelerator beams Commissioning and operations software Accelerator simulation and simulation codes Design of...

170

NIST: Methane Symmetry Operations - Introduction  

Science Conference Proceedings (OSTI)

Methane Symmetry Operations. ... At least three T d symmetry classification systems are widely used at present in the methane literature [5-13]. ...

171

AVESTAR® - Training - Combined Cycle Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Exercise Startup Circulating Water System Startup Fuel Systems Draw vacuum in Condenser Start Gas Turbine (GT) and bring to rated speed on natural gas ITS operations to...

172

TUTORIALS: Solar Cell Operation - TMS  

Science Conference Proceedings (OSTI)

Jan 21, 2008 ... This animated tutorial describes the basics of solar cell operation. It defines the photovoltaic effect, discusses electron and current flow within a ...

173

SPECTR System Operational Test Report  

Science Conference Proceedings (OSTI)

This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

W.H. Landman Jr.

2011-08-01T23:59:59.000Z

174

Sector 9 | Operations and Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Sector 9 Operations and Schedule Contents: 9-ID User Manual 9-BM User Manual Common Tasks Computers and Software Troubleshooting Web Cameras...

175

PARALLEL OPERATION OF WELDING GENERATORS  

SciTech Connect

Eight 900-amp, 36-kw direct current welding generators driven by eight 60-hp induction motors were operated in parallel to supply up to 7200 amp to resistance loads for heat transfer studies. A description and circuit designs of this installation, which provides safety interlocks and permits sectionalized operation for separate leads, are given. (auth)

Butler, B.H.

1960-06-01T23:59:59.000Z

176

Implementing an Operator Excellence Program  

Science Conference Proceedings (OSTI)

This document is designed to offer power plant operations staff the essential elements that EPRI believes are necessary to effectively implement a successful Operator Excellence Program (OEP). The elements consist of the following: • Creation of an OEP implementation team • Project management considerations • Blended training program considerations • Qualification and certification considerations • An effective quality assurance program

2002-12-29T23:59:59.000Z

177

###Operating Principles published 411.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of operating principles with S-system models Yun Lee 1 , Po-Wei Chen 1 , Eberhard O. Voit ⇑ The Wallace H. Coulter Department of Biomedical Engineering, Georgia Tech and Emory University, 313 Ferst Drive, Suite 4103, Atlanta, GA 30332-0535, United States a r t i c l e i n f o Article history: Available online 4 March 2011 Keywords: Biochemical Systems Theory Design principle Heat stress Operating principle S-system Trehalose a b s t r a c t Operating principles address general questions regarding the response dynamics of biological systems as we observe or hypothesize them, in comparison to a priori equally valid alternatives. In analogy to design principles, the question arises: Why are some operating strategies encountered more frequently than others and in what sense might they be superior? It is at this point impossible to study operation prin- ciples in complete generality,

178

AVESTAR® - Training - Gasification Process Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Gasification Process Operations Gasification Process Operations This course is designed as a familiarization course to increase understanding of the gasification with CO2 capture process. During the training, participants will startup and shutdown the simulated unit in an integrated manner and will be exposed to simple and complex unit malfunctions in the control room and in the field. Course objectives are as follows: Introduce trainees to gasification and CO2 capture process systems and major components and how they dynamically interact Familiarize trainees with the Human Machine Interface (HMI) and plant control and how safe and efficient operation of the unit can be affected by plant problems Provide the trainees with hands-on operating experiences in plant operations using the HMI

179

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S.- Canada Border.

180

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

182

Transportation System Concept of Operations  

Science Conference Proceedings (OSTI)

The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level descriptions. of subsystems and components, and the Transportation System Requirements Document. Other program and system documents, plans, instructions, and detailed designs will be consistent with and informed by the Transportation System Concept of Operations. The Transportation System Concept of Operations is a living document, enduring throughout the OCRWM systems engineering lifecycle. It will undergo formal approval and controlled revisions as appropriate while the Transportation System matures. Revisions will take into account new policy decisions, new information available through system modeling, engineering investigations, technical analyses and tests, and the introduction of new technologies that can demonstrably improve system performance.

N. Slater-Thompson

2006-08-16T23:59:59.000Z

183

Conditional Probabilities, Relative Operating Characteristics, and Relative Operating Levels  

Science Conference Proceedings (OSTI)

The relative operating characteristic (ROC) curve is a highly flexible method for representing the quality of dichotomous, categorical, continuous, and probabilistic forecasts. The method is based on ratios that measure the proportions of events ...

Simon J. Mason; Nicholas E. Graham

1999-10-01T23:59:59.000Z

184

Definition: Operating Process | Open Energy Information  

Open Energy Info (EERE)

Process Jump to: navigation, search Dictionary.png Operating Process A document that identifies general steps for achieving a generic operating goal. An Operating Process includes...

185

NNSA Streamlines Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

NNSA Timeline > NNSA Streamlines Operations NNSA Streamlines Operations December 20, 2002 Washington, DC NNSA Streamlines Operations The National Nuclear Security Administration...

186

SNS Operations Status Update | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Home SNS Operations Status Update SNS Operations Status Update - November 29, 2012 Resumption of SNS Operations and User Program Neutron production resumed on November 29,...

187

Operable windows, personal control and occupant comfort.  

E-Print Network (OSTI)

ASHRAE’s permission. Operable Windows, Personal Control, andcontrol of operable windows in naturally-ventilated officeences on the operation of windows in a naturally venti-

Brager, Gail; Paliaga, Gwelen; de Dear, Richard

2004-01-01T23:59:59.000Z

188

External Independent Review (EIR) Standard Operating Procedure...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standard Operating Procedure (SOP) External Independent Review (EIR) Standard Operating Procedure (SOP) EIR SOP.pdf More Documents & Publications ICR-ICE Standard Operating...

189

ORISE: Operations Support and Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

190

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

191

INJECTIVE COGENERATORS AMONG OPERATOR BIMODULES  

E-Print Network (OSTI)

Abstract. Given C ?-algebras A and B acting cyclically on Hilbert spaces H and K, respectively, we characterize completely isometric A, B-bimodule maps from B(K, H) into operator A, B-bimodules. We determine cogenerators in some classes of operator bimodules. For an injective cogenerator X in a suitable category of operator A, B-bimodules we show: if A, regarded as a C ?-subalgebra of A?(X) (adjointable left multipliers on X), is equal to its relative double commutant in A?(X), then A must be a W ?-algebra. 1.

Bojan Magajna

2005-01-01T23:59:59.000Z

192

Transforming quantum operations: quantum supermaps  

E-Print Network (OSTI)

We introduce the concept of quantum supermap, describing the most general transformation that maps an input quantum operation into an output quantum operation. Since quantum operations include as special cases quantum states, effects, and measurements, quantum supermaps describe all possible transformations between elementary quantum objects (quantum systems as well as quantum devices). After giving the axiomatic definition of supermap, we prove a realization theorem, which shows that any supermap can be physically implemented as a simple quantum circuit. Applications to quantum programming, cloning, discrimination, estimation, information-disturbance trade-off, and tomography of channels are outlined.

G. Chiribella; G. M. D'Ariano; P. Perinotti

2008-04-01T23:59:59.000Z

193

AN OPERATIONAL WATER AND ENERGY BALANCE ALGORITHM FOR PUERTO RICO Eric Harmsen  

E-Print Network (OSTI)

twenty-three hydro-climate variables, available to the public on a daily basis (http://pragwater.com/goes-puerto-rico-water-and-energyAN OPERATIONAL WATER AND ENERGY BALANCE ALGORITHM FOR PUERTO RICO Eric Harmsen Department.com In this study an operational water and energy balance algorithm for Puerto Rico (GOES- PRWEB) was developed

Gilbes, Fernando

194

Power Systems Operation Planning Optimization.  

E-Print Network (OSTI)

??Optimal hydrothermal power dispatch on a multi-area network is a large-scale non-linear problem. Its objective is to find the optimal generation schedule of hydro and… (more)

FRAGOMENI, UMBERTO

2013-01-01T23:59:59.000Z

195

AUTHORIZATION TO CONTINUE OPERATION OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Competition] Contract Competition] AUTHORIZATION TO CONTINUE OPERATION OF THE_[insert the name of the laboratory/site/facility]___ UNDER A MANAGEMENT AND OPERATING CONTRACT The _[insert the name of the laboratory/site/facility]_ is currently managed and operated by _[insert the name of the contractor]_ for the Department of Energy under a Management and Operating (M&O) contract as defined in Federal Acquisition Regulation (FAR) Subpart 17.6. The current contract and the determination authorizing the M&O form of contract expire on _[insert the expiration date]_. _[In one or two sentences, briefly describe the laboratory/site/facility mission]_. A new contract is currently being procured by the DOE _[insert DOE office name]_, under Request for Proposals (RFP) number _[insert RFP number]_. The resultant

196

AUTHORIZATION TO CONTINUE OPERATION OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-competitive Extension] Non-competitive Extension] AUTHORIZATION TO CONTINUE OPERATION OF THE_[insert the name of the laboratory/site/facility]___ UNDER A MANAGEMENT AND OPERATING CONTRACT The _[insert the name of the laboratory/site/facility]_ is currently managed and operated by _[insert the name of the contractor]_ for the Department of Energy under DOE contract _[insert contract number]._This contract is a Management and Operating (M&O) contract as defined in Federal Acquisition Regulation (FAR) Subpart 17.6. The current contract and the determination authorizing the M&O form of contract expire on _[insert the expiration date]_. A non-competitive extension is currently being pursued in accordance with FAR 6.301. [In one or two sentences, briefly describe the

197

Response Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response Operations Response Operations Response Operations Overview The federal government primarily plays a coordinating and support role during disaster response. DOE's role is to facilitate recovery from disruptions to the energy supply. OE's capabilities and resources include personnel with emergency response and energy systems operations experience, leading-edge analytical modeling and visualization capabilities, coordination and contacts with private industry, state governments, and U.S. government agencies, and facilitation of special policy waivers or legal authorities by the Secretary of Energy. Response and Restoration State and Local Energy Assurance Planning National Response Framework ESF-12 This National Response Framework (NRF) is a guide to how the Nation conducts all-hazards response. Emergency Support Function #12 - Energy

198

Operation chaining asynchronous pipelined circuits  

Science Conference Proceedings (OSTI)

We define operation chaining (op-chaining) as an optimization problem to determine the optimal pipeline depth for balancing performance against energy demands in pipelined asynchronous designs. Since there are no clock period requirements, asynchronous ...

Girish Venkataramani; Seth C. Goldstein

2007-11-01T23:59:59.000Z

199

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

200

Operational Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Management Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Office of Aviation Management U.S. Department of Energy, MA-30 1000 Independence Ave., SW Washington, DC 20585 Glen Wattman Director 202-586-5532 Glen.Wattman@hq.doe.gov Office of Administration U.S. Department of Energy, MA-40 1000 Independence Ave., SW Washington, DC 20585 Peter O'Konski Director 202-586-5710 peter.o'konski@hq.doe.gov Rebecca Montoya Deputy Director 202-586-0610 rebecca.montoya@hq.doe.gov Office of Engineering and Construction Management U.S. Department of Energy, MA-50

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

SRS - Programs - F Area Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

All three facilities were built in the 1950s. Historically, F Canyon operations recovered plutonium-239 (Pu-239) and uranium-238 (U-238) by a chemical separation process after...

202

Preparation for Facility Operations RM  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this Standard Review Plan (SRP) on Preparation for Facility Operations is to provide consistency guidance to evaluate the effectiveness of the final project closure of major...

203

Savannah River Operations Office Homepage  

NLE Websites -- All DOE Office Websites

Savannah River Operations banner art and link to DOE Link to Energy.gov Link to Energy.gov National Day of Remembrance NOTICE TO USERS Use of this system constitutes consent to...

204

Design of micropower operational amplifiers  

E-Print Network (OSTI)

The operational amplifier is a fundamental building block for electronic devices and systems. The advancement of modern electronic technology has been setting more performance demand on the underlying integrated circuits ...

Rayanakorn, Surapap

2006-01-01T23:59:59.000Z

205

Idaho Operations AMWTP Fact Sheet  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's Idaho Operations Advanced Mixed Waste Treatment Project (AMWTP) is the nation's premier transuranic radioactive waste facility. This fact sheet provides an overview of the the project.

206

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

offers a significant benefit to water-intensive industrial processes such as oil-gas fracking operations that use 3 to 5 million gallons of water per well (video at www.inl.gov...

207

DIII-D research operations  

Science Conference Proceedings (OSTI)

This report discusses the research on the following topics: DIII-D program overview; divertor and boundary research program; advanced tokamak studies; tokamak physics; operations; program development; support services; contribution to ITER physics R D; and collaborative efforts.

Baker, D. (ed.)

1993-05-01T23:59:59.000Z

208

Self-adjoint phase operator  

Science Conference Proceedings (OSTI)

and E.V. Damaskinskii ... 1 . Introduction. The problem of quantizing classical action-phase (angle) .... of the ordinary canonical operators Q and P in L2([0, 1])).

209

The Navy's Operational Atmospheric Analysis  

Science Conference Proceedings (OSTI)

In January of 1988, significant upgrades were made to the Navy Operational Global Atmospheric Prediction System (NOGAPS). Among these improvements was the implementation of a multivariate optimum interpolation analysis scheme. Since that time, ...

James S. Goerss; Patricia A. Phoebus

1992-06-01T23:59:59.000Z

210

Reactor operation environmental information document  

Science Conference Proceedings (OSTI)

This volume is a reactor operation environmental information document for the Savannah River Plant. Topics include meteorology, surface hydrology, transport, environmental impacts, and radiation effects. 48 figs., 56 tabs. (KD)

Bauer, L.R.; Hayes, D.W.; Hunter, C.H.; Marter, W.L.; Moyer, R.A.

1989-12-01T23:59:59.000Z

211

Operations Analysis - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage Ring Chief of Operations Argonne National Laboratory Bldg 401B2150 9700 S. Cass Avenue Argonne, IL 60439 (630) 252-5949 office (630) 252-5703 FAX schroedr@aps.anl.gov...

212

Operations Analysis - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

S. Cass Avenue FAX number: 5703 Argonne, IL 60439 Email pager: 1766 Email Internet: cyao@aps.anl.gov Areas of interest Operations-related accelerator physics for storage ring, PAR,...

213

Disruption Management --Operations Research between  

E-Print Network (OSTI)

"one feather turned into five hens": A Boeing 747 from a major airline is on its way from New York moment, the delay is not more serious than delays due to heavy traffic over London, so the Operations

214

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2013 18, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, 2013: A manager at the Advanced Mixed Waste Treatment Project (AMWTP) determined that the AMWTP Safety Analysis process required review due to an operational trend of fire/combustion events in the Treatment Facility (TF) box lines. Safety analysis for the TF is

215

Manipulator Grasping and Pushing Operations  

E-Print Network (OSTI)

The primary goal of this research is to develop theoretical tools for analysis, synthesis, application of primitive manipulator operations. The primary method is to extend and apply traditional tools of classical mechanics. ...

Mason, Matthew Thomas

1982-06-01T23:59:59.000Z

216

Reactor operation safety information document  

Science Conference Proceedings (OSTI)

The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

Not Available

1990-01-01T23:59:59.000Z

217

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

218

Critical Operating Constraint Forecasting (COCF)  

Science Conference Proceedings (OSTI)

This document represents the progress report and Task 1 letter report of the California Institute for Energy and Environment (CIEE) contract funded by the California Energy Commission (CEC), Critical Operating Constraint Forecasting (COCF) for California Independent System Operator (CAISO) Planning Phase. Task 1 was to accomplish the following items: Collect data from CAISO to set up the WECC power flow base case representing the CAISO system in the summer of 2006 Run TRACE for maximizing California Impo...

2006-06-30T23:59:59.000Z

219

Pulverizer Operational and Performance Upgrades  

Science Conference Proceedings (OSTI)

In 1997, a survey of coal pulverizer operating experience was performed at the request of the funders of the EPRI Pulverizer Interest Group (PIG). The primary purpose of the survey was to determine the distributions of pulverizer manufacturers, types, models and sizes among the fleet of existing pulverizers operated by the PIG members. This effort was undertaken in order to optimally direct an R&D program8217s tasks focusing on field testing and physical and computer modeling.

2006-12-19T23:59:59.000Z

220

Entanglement transformations using separable operations  

E-Print Network (OSTI)

We study conditions for the deterministic transformation $\\ket{\\psi}\\longrightarrow\\ket{\\phi}$ of a bipartite entangled state by a separable operation. If the separable operation is a local operation with classical communication (LOCC), Nielsen's majorization theorem provides necessary and sufficient conditions. For the general case we derive a necessary condition in terms of products of Schmidt coefficients, which is equivalent to the Nielsen condition when either of the two factor spaces is of dimension 2, but is otherwise weaker. One implication is that no separable operation can reverse a deterministic map produced by another separable operation, if one excludes the case where the Schmidt coefficients of $\\ket{\\psi}$ and are the same as those of $\\ket{\\phi}$. The question of sufficient conditions in the general separable case remains open. When the Schmidt coefficients of $\\ket{\\psi}$ are the same as those of $\\ket{\\phi}$, we show that the Kraus operators of the separable transformation restricted to the supports of $\\ket{\\psi}$ on the factor spaces are proportional to unitaries. When that proportionality holds and the factor spaces have equal dimension, we find conditions for the deterministic transformation of a collection of several full Schmidt rank pure states $\\ket{\\psi_j}$ to pure states $\\ket{\\phi_j}$.

Vlad Gheorghiu; Robert B. Griffiths

2007-05-02T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Infrastructure and Operations | National Nuclear Security Administrati...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Infrastructure and Operations develops and executes NNSA's infrastructure investment, maintenance, and operations programs and policies. Printer-friendly version...

222

Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations  

SciTech Connect

The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage.

Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

1997-06-01T23:59:59.000Z

223

Overview of KSTAR initial operation  

Science Conference Proceedings (OSTI)

Since the successful first plasma generation in the middle of 2008, three experimental campaigns were successfully made for the KSTAR device, accompanied with a necessary upgrade in the power supply, heating, wall-conditioning and diagnostic systems. KSTAR was operated with the toroidal magnetic field up to 3.6 T and the circular and shaped plasmas with current up to 700 kA and pulse length of 7 s, have been achieved with limited capacity of PF magnet power supplies. The mission of the KSTAR experimental program is to achieve steady-state operations with high performance plasmas relevant to ITER and future reactors. The first phase (2008 2012) of operation of KSTAR is dedicated to the development of operational capabilities for a super-conducting device with relatively short pulse. Development of start-up scenario for a super-conducting tokamak and the understanding of magnetic field errors on start-up are one of the important issues to be resolved. Some specific operation techniques for a super-conducting device are also developed and tested. The second harmonic pre-ionization with 84 and 110 GHz gyrotrons is an example. Various parameters have been scanned to optimize the pre-ionization. Another example is the ICRF wall conditioning (ICWC), which was routinely applied during the shot to shot interval. The plasma operation window has been extended in terms of plasma beta and stability boundary. The achievement of high confinement mode was made in the last campaign with the first neutral beam injector and good wall conditioning. Plasma control has been applied in shape and position control and now a preliminary kinetic control scheme is being applied including plasma current and density. Advanced control schemes will be developed and tested in future operations including active profiles, heating and current drives and control coil-driven magnetic perturbation.

Kwon, M. [National Fusion Research Institute, Daejon, South Korea; Oh, Y. K. [National Fusion Research Institute, Daejon, South Korea; Yang, H. L. [National Fusion Research Institute, Daejon, South Korea; Na, H. K. [National Fusion Research Institute, Daejon, South Korea; Kim, Y. S. [National Fusion Research Institute, Daejon, South Korea; Kwak, J. G. [National Fusion Research Institute, Daejon, South Korea; Kim, W. C. [National Fusion Research Institute, Daejon, South Korea; Kim, J. Y. [National Fusion Research Institute, Daejon, South Korea; Ahn, Joonwook [ORNL; Ahn, J.W. [Oak Ridge National Laboratory (ORNL); Bae, Y. S. [National Fusion Research Institute, Daejon, South Korea; Baek, S. H. [National Fusion Research Institute, Daejon, South Korea; Bak, J. G. [National Fusion Research Institute, Daejon, South Korea; Bang, E. N. [National Fusion Research Institute, Daejon, South Korea; Chang, C. S. [Korea Advanced Institute of Science and Technology; Chang, D. H. [Korea Atomic Energy Research Institute; Chavdarovski, I. [National Fusion Research Institute, Daejon, South Korea; Chen, Z. Y. [National Fusion Research Institute, Daejon, South Korea; Cho, K. W. [National Fusion Research Institute, Daejon, South Korea; Cho, M. H. [Pohang University of Science and Technology (POSTECH), Pohang, Republic of Korea; Choe, W. [Korea Advanced Institute of Science and Technology; Choi, J. H. [National Fusion Research Institute, Daejon, South Korea; Chu, Y. [National Fusion Research Institute, Daejon, South Korea; Chung, K. S. [Hanyang University, Korea; Diamond, P. H. [University of California, San Diego; Do, H. J. [National Fusion Research Institute, Daejon, South Korea; Eidietis, N. W. [General Atomics, San Diego; England, A. C. [National Fusion Research Institute, Daejon, South Korea; Grisham, L. [Princeton Plasma Physics Laboratory (PPPL); Hahm, T. S. [Princeton Plasma Physics Laboratory (PPPL); Hahn, S. H. [National Fusion Research Institute, Daejon, South Korea; Han, W. S. [National Fusion Research Institute, Daejon, South Korea; Hatae, T. [Japan Atomic Energy Agency (JAEA); Hillis, D. L. [Oak Ridge National Laboratory (ORNL); Hong, J. S. [National Fusion Research Institute, Daejon, South Korea; Hong, S. H. [National Fusion Research Institute, Daejon, South Korea

2011-01-01T23:59:59.000Z

224

Operating Efficiency Comes From Teamwork  

E-Print Network (OSTI)

A group of operating and planning personnel formed the INter Plant Utilities Team [INPUT] to improve energy efficiency and reliability for Exxon's Baytown, Texas, refinery and chemical plants complex. The Team coordinates the day-to-day operations of the Site's utilities generation and distribution systems, which cross the operating boundaries of all three of the plants in the complex, and supports both capital improvements and long-term energy optimization projects for those systems. INPUTs origins go back to the early 1980's, when a utility coordination team was organized to manage the interplay of the Site's several high-level steam systems, and to reduce the impact of occasional steam shortages on the operations of both Refinery and Chemical Plant. Three years ago the current team was formed to find ways to make the systems more efficient and reliable, and to pave the way for the Site's cogeneration expansion. INPUT provides a regular forum for surfacing and resolving issues that affect the economics and reliability of the Site's utility systems, and is a commitment on the part of the three Plants at the Site to work together for the overall benefit of the Site --a commitment worth over $5,000,000 annually in operating cost savings.

Relyea, D. L.; Stone, A.

1997-04-01T23:59:59.000Z

225

HydroPulse Drilling  

Science Conference Proceedings (OSTI)

Tempress HydroPulse{trademark} tool increases overbalanced drilling rates by generating intense suction pulses at the drill bit. This report describes the operation of the tool; results of pressure drilling tests, wear tests and downhole drilling tests; and the business case for field applications. The HydroPulse{trademark} tool is designed to operate on weighted drilling mud at conventional flow rates and pressures. Pressure drilling tests confirm that the HydroPulse{trademark} tool provides 33% to 200% increased rate of penetration. Field tests demonstrated conventional rotary and mud motor drilling operations. The tool has been operated continuous for 50 hours on weighted mud in a wear test stand. This level of reliability is the threshold for commercial application. A seismic-while-drilling version of the tool was also developed and tested. This tool was used to demonstrate reverse vertical seismic profiling while drilling an inclined test well with a PDC bit. The primary applications for the HydroPulse{trademark} tool are deep onshore and offshore drilling where rate of penetration drives costs. The application of the seismic tool is vertical seismic profiling-while-drilling and look-ahead seismic imaging while drilling.

J.J. Kolle

2004-04-01T23:59:59.000Z

226

1Office of Headquarters Operations Office of Headquarters Operations  

E-Print Network (OSTI)

· Initially, the needs assessment will be piloted across organizations within the Office of HQ Operations across all organizations at NASA HQ later in the year #12;16 Assessment P Assessment · HQ Web Site Redesign/Event and Meeting Services · Pandemic Preparedness · New Employees

227

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

26, 2013 26, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) July 31, 2013: The Idaho Treatment Group, LLC (ITG), the managing contractor for the Advanced Mixed Waste Treatment Project received a warning letter from the State of Idaho's Department of Environmental quality regarding self- reported RCRA permit violations which

228

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

229

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

January 6, 2014 January 6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Notable Accomplishments: Contracting companies supporting EM's cleanup program and the Office of Nuclear Energy at the Idaho site volunteered to be among the first to use a new DOE

230

Property testing of unitary operators  

Science Conference Proceedings (OSTI)

In this paper, we systematically study property testing of unitary operators. We first introduce a distance measure that reflects the average difference between unitary operators. Then we show that, with respect to this distance measure, the orthogonal group, quantum juntas (i.e., unitary operators that only nontrivially act on a few qubits of the system), and the Clifford group can be all efficiently tested. In fact, their testing algorithms have query complexities independent of the system's size and have only one-sided error. Then we give an algorithm that tests any finite subset of the unitary group, and demonstrate an application of this algorithm to the permutation group. This algorithm also has one-sided error and polynomial query complexity, but it is unknown whether it can be efficiently implemented in general.

Wang Guoming [Computer Science Division, University of California, Berkeley, California 94720 (United States)

2011-11-15T23:59:59.000Z

231

Electrochemical cell operation and system  

DOE Patents (OSTI)

Thermal control in fuel cell operation is affected through sensible heat of process gas by providing common input manifolding of the cell gas flow passage in communication with the cell electrolyte and an additional gas flow passage which is isolated from the cell electrolyte and in thermal communication with a heat-generating surface of the cell. Flow level in the cell gas flow passage is selected based on desired output electrical energy and flow level in the additional gas flow passage is selected in accordance with desired cell operating temperature.

Maru, Hansraj C. (Brookfield Center, CT)

1980-03-11T23:59:59.000Z

232

Electric Vehicle Site Operator Program  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-01-01T23:59:59.000Z

233

Hydro Operational Restrictions Forum: Licensee and Stakeholder Workshop Summary  

Science Conference Proceedings (OSTI)

Despite producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as providers of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources.

1998-12-03T23:59:59.000Z

234

Hydro Operational Restrictions Forum: Agency and NGO Workshop Summary  

Science Conference Proceedings (OSTI)

Despite producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as a unique provider of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources.

1998-09-25T23:59:59.000Z

235

Hydro Relicensing Forum: Relicensing Strategies: National Review Group Progress Report 2002  

Science Conference Proceedings (OSTI)

As part of its Hydro Relicensing Forum, EPRI convened a National Review Group (NRG) to improve the outcome of hydroelectric relicensing through a neutral dialogue between hydro operators, government agencies, tribes, and non-governmental organizations (NGOs).

2002-11-26T23:59:59.000Z

236

Aggregation operators for fuzzy ontologies  

Science Conference Proceedings (OSTI)

Fuzzy ontologies extend classical ontologies to allow the representation of imprecise and vague knowledge. Although a relatively important amount of work has been carried out in the field during the last years and they have been successfully used in ... Keywords: Aggregation operators, Fuzzy Description Logics, Fuzzy integrals, Fuzzy ontologies, Logic for the Semantic Web

Fernando Bobillo, Umberto Straccia

2013-09-01T23:59:59.000Z

237

Operation REDWING 1956. Technical report  

SciTech Connect

REDWING was a 17-detonation atmospheric nuclear weapons test series conducted in the Marshall Islands at Enewetak and Bikini atolls in spring and summer 1956. This is a report of DOD personnel in REDWING with an emphasis on operations and radiological safety.

Bruce-Henderson, S.; Gladeck, F.R.; Hallowell, J.H.; Martin, E.J.; McMullan, F.W.

1982-08-01T23:59:59.000Z

238

Hadamard type operations for qubits  

E-Print Network (OSTI)

We obtain the most general ensemble of qubits, for which it is possible to design a universal Hadamard gate. These states when geometrically represented on the Bloch sphere, give a new trajectory. We further consider some Hadamard `type' of operations and find ensembles of states for which such transformations hold. Unequal superposition of a qubit and its orthogonal complement is also investigated.

Arpita Maitra; Preeti Parashar

2005-05-10T23:59:59.000Z

239

Richland Operations Office technology summary  

SciTech Connect

This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

Not Available

1994-05-01T23:59:59.000Z

240

LANL continuity of operations plan  

SciTech Connect

The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

Senutovitch, Diane M [Los Alamos National Laboratory

2010-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

NLE Websites -- All DOE Office Websites (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

242

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

243

Operating strategy generators for nuclear reactors  

Science Conference Proceedings (OSTI)

Operating strategy generators, i.e., the software intended for increasing the efficiency of work of nuclear power plant operators, are discussed. The possibilities provided by the domestic and foreign operating-strategy generators are analyzed.

Solovyev, D. A., E-mail: and@est.mephi.ru; Semenov, A. A.; Shchukin, N. V. [National Research Nuclear University MEPhI (Russian Federation)

2011-12-15T23:59:59.000Z

244

REAL TIME SYSTEM OPERATIONS 2006-2007  

E-Print Network (OSTI)

Advances in Power System  Control, Operation and Management Control And Operation of Large Electric Power  Systems – Power System Small Signal  Stability Analysis”, Fourth International Conference on Advances in Power System Control,  Operation 

Eto, Joseph H.

2008-01-01T23:59:59.000Z

245

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT  

E-Print Network (OSTI)

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT _________________________________________________________ Applicants for positions involving the operation of a commercial motor vehicle must comply with Title 49 CFR: _______________ Please list the following information for each unexpired commercial motor vehicle operator license

Roy, Subrata

246

MPI Collective Operations over IP Multicast  

Science Conference Proceedings (OSTI)

Many common implementations of Message Passing Interface (MPI) implement collective operations over point-to-point operations. This work examines IP multicast as a framework for collective operations. IP multicast is not reliable. If a receiver is not ...

Hsiang Ann Chen; Yvette O. Carrasco; Amy W. Apon

2000-05-01T23:59:59.000Z

247

CMS FNAL Remote Operations Center  

NLE Websites -- All DOE Office Websites (Extended Search)

LHC@FNAL Remote Operations Center (ROC) at Fermilab is located on the first floor of Wilson Hall. From the ROC, shifters perform real-time monitoring of the data recorded by the CMS Experiment. LHC@FNAL Remote Operations Center (ROC) at Fermilab is located on the first floor of Wilson Hall. From the ROC, shifters perform real-time monitoring of the data recorded by the CMS Experiment. ROC WBM / WBM Twiki FNAL ELog Mailing List Agendas / ROC Presentations & Notes WBM Publications Runs CVS SiTracker / MTCC AEM / AEM help Screen Snapshot Service FAQ Accounts & Nodes New User Instructions WebCams CMS Workbook Directories / Glossaries Photos Vidyo / EVO Google / Wikipedia LHC@FNAL Computing Console Map Documents Mailing List One East Mtg Schedule rocshare Telephones To Do List Video Conferencing CMS Shifter CSC DAQ DataOps DQM / FNAL ROC ECAL Event Display HCAL Pixel Trigger Global Run Calendar CMS Live Contact List DAQ Status DAS

248

Modal Analysis for Grid Operation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presenter: Ning Zhou Pacific Northwest National Laboratory ning.zhou@pnnl.gov 27/28 June 2013 Washington, DC DOE/OE Transmission Reliability Program Past Oscillation Event - 1996/08/10 [bitmap version 1100 1200 1300 1400 1500 15:42:03 15:48:51 15:47:36 Power (MW) August 10, 1996 Western Power System Breakup California-Oregon Intertie Time Domain ~ -3.1% < ~3.5% Damping ~ 8.4% Early Warning ~6 minutes Freq Domain Project Objective  Ways to Improve Damping - Power System Stabilizer (PSS): parameters pre-tuned based on off-line scenarios - Reactive Support: locations pre-selected based on off-line scenarios - Adjustment of Operator Controllable Variables : operator actions determined with the on-line scenarios  Objective of this Project:

249

D and D Operational Experience  

SciTech Connect

This paper describes the operational experience gained from more than 25 million man-hours of Decontamination and Decommissioning (D and D) work on both Department of Energy sites and commercial nuclear facilities in the United States. Nuclear D and D activities encompass some of the most hazardous activities imaginable - protecting workers from a huge range and endless combinations of industrial safety, radiological, nuclear safety, and industrial hygiene issues which challenges managers and safety professionals. Performing D and D activities safely is essential to project success. Managers must ensure that work is properly planned and executed, that hazards are identified and mitigated, and that operational experience is captured and utilized on future projects. Many of the lessons learned directly relate to the principles of behavioral-based safety. Our experience indicates that improved safety performance leads to improved productivity. (authors)

Meyer, K.A.; Smith, C.B. [BNG America, 9781 S. Meridian Blvd., Suite 100, Englewood, CO 80112 (United States)

2006-07-01T23:59:59.000Z

250

Relaxation labeling using modular operators  

SciTech Connect

Probabilistic relaxation labeling has been shown to be useful in image processing, pattern recognition, and artificial intelligence. The approaches taken to date have been encumbered with computationally extensive summations which generally prevent real-time operation and/or easy hardware implementation. The authors present a new and unique approach to the relaxation labeling problem using modular, VLSI-oriented hierarchical complex operators. One of the fundamental concepts of this work is the representation of the probability distribution of the possible labels for a given object (pixel) as an ellipse, which may be summed with neighboring object's distribution ellipses, resulting in a new, relaxed label space. The mathematical development of the elliptical approach will be presented and compared to more classical approaches, and a hardware block diagram that shows the implementation of the relaxation scheme using vlsi chips will be presented. Finally, results will be shown which illustrate applications of the modular scheme, iteratively, to both edges and lines. 13 references.

Duncan, J.S.; Frei, W.

1983-01-01T23:59:59.000Z

251

Fermilab SRF cryomodule operational experience  

SciTech Connect

Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system.

Martinez, A.; Klebaner, A.L.; Theilacker, J.C.; DeGraff, B.D.; White, M.; Johnson, G.S.; /Fermilab

2011-06-01T23:59:59.000Z

252

Damping measurements using operational data  

DOE Green Energy (OSTI)

We have measured modal damping using strain-gauge data from an operating wind turbine. Previously, such measurements were difficult and expensive. Auto-correlation and cross-correlation functions of the strain-gauge data have been shown to consist of decaying sinusoids which correspond to the modal frequencies and damping ratios of the wind turbine. We have verified the method by extracting damping values from an analytically generated data set. Actual operating response data from the DOE/Sandia 34-meter Test Bed has been used to calculate modal damping ratios as a function of rotor rotation rate. This capability will allow more accurate fatigue life prediction and control. 16 refs., 3 figs., 2 tabs.

James, G.H.; Carne, T.G.; Veers, P.S.

1991-01-01T23:59:59.000Z

253

NEUTRONIC REACTOR CONSTRUCTION AND OPERATION  

DOE Patents (OSTI)

A method is given for operating a nuclear reactor having a negative coefficient of reactivity to compensate for the change in reactor reactivity due to the burn-up of the xenon peak following start-up of the reactor. When it is desired to start up the reactor within less than 72 hours after shutdown, the temperature of the reactor is lowered prior to start-up, and then gradually raised after start-up.

West, J.M.; Weills, J.T.

1960-03-15T23:59:59.000Z

254

Supplement Analysis for the System Operation Review EIS (DOE/EIS-0170/SA-1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the System Operation Review EIS (DOE/EIS-0170/SA-1) Anthony G. White - PGPL-5 Public Utility Specialist and Secretary, United States Entity Proposed Action: Non-Treaty Storage Agreement (NTSA) - Contract Extension, Contract Number DE-MS79- 90BP92754. Proposed By: Bonneville Power Administration (BPA) and B.C. Hydro and Power Authority (BC Hydro). Location: British Columbia, Canada. Description of the Proposed Action: BPA and BC Hydro propose to extend the existing NTSA for a period of one year. Analysis: On July 5, 1990, BPA and BC Hydro signed the NTSA, which expanded the amount of non- Treaty storage space available in Canada and extended the then-existing agreement from 1993 to

255

Accelerator Operations and Physics - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Review Fill History RMD Reports ASD AES XSD APS Argonne Accelerator Operations & Physics Operational Items Storage ring current and lifetime On-axis Brilliance Plots Source...

256

Accelerator Operations and Physics - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Operations & Physics Accelerator Systems Division---Argonne National Laboratory Mission Statement Safe, reliable, attentive, and responsive operation of APS accelerator...

257

Operation of Distributed Generation Under Stochastic Prices  

E-Print Network (OSTI)

Operation of Distributed Generation Under Stochastic PricesOPERATION OF DISTRIBUTED GENERATION UNDER STOCHASTIC PRICESwith either on-site distributed generation (DG) or purchases

Siddiqui, Afzal S.; Marnay, Chris

2005-01-01T23:59:59.000Z

258

The Operational Risk Simulation Model (ORSIM)  

Science Conference Proceedings (OSTI)

The Operational Risk Simulation Model (ORSIM) permits power plant owners to understand the implications of new operational policies and unanticipated demands on the organization.

2006-03-30T23:59:59.000Z

259

Department of Energy Idaho Operations Summary Releases  

NLE Websites -- All DOE Office Websites (Extended Search)

Press Box > DOE-Idaho Operations Summary DOE-Idaho Operations Summary These summaries provide information on health, safety and environmental incidents at DOE facilities in Idaho....

260

EVMS Surveillance Standard Operating Procedure (ESSOP) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reporting System (PARS II) INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures ICR-ICE Standard Operating Procedures (Update Sept 2013)...

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

LANL continuity of operations plan  

SciTech Connect

The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

Senutovitch, Diane M [Los Alamos National Laboratory

2010-12-22T23:59:59.000Z

262

PROJECTIZING AN OPERATING NUCLEAR FACILITY  

SciTech Connect

This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully accomplish deactivation. This concept had to allow for continued operations in FB Line until 2005, while providing distinct task-oriented teams for deactivation of the FCC. Facility workers, always the most knowledgeable about any facility, were integral parts of the project team. The team defined the scope, developed a bottoms-up estimate, reorganized personnel to designated project teams, and developed a baseline schedule with about 12,000 activities. Training was implemented to prepare the facility workers to use project management tools and concepts, which were to execute the project, coordinate activities and track progress. The project budget was estimated at $579 million. The team completed F Canyon and FB Line deactivation in August 2006, four months ahead of schedule and under budget.

Adams, N

2007-07-08T23:59:59.000Z

263

FUPWG Purpose, Policies, and Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

264

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

265

FUPWG Purpose, Policies, and Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

266

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

267

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

268

METHOD OF OPERATING A CALUTRON  

DOE Patents (OSTI)

A method of operating an electromagnetic isotope separator of the calutron class is reported whereby uranium tetrachloride is produced at a controlled rate within the source rather than betng introduced therein as was formerly practiced. This is accomplished by placing a uranium-bearing material, such as uranium metal, uranium trichloride, or uranium carbide in the charge receptacle of the calutron, heating this material to about to produce uranium tetrachloride vapor at a rate controlled by the chlorine gas flow into the source. The vapor is subsequently ionized by an electric arc and mass separated by conventional calutron methods.

Davidson, P.H.

1960-01-12T23:59:59.000Z

269

Anaerobic Digesters Design and Operation  

E-Print Network (OSTI)

Public awar'eness of the need to develop systems for producing energy from readilyrenewable sources, as an alternative to energy from expensive and diminishing supplies of fossil fuels, led to research at The Pennsylvania State University on systems for methane production by anaerobic digestion of animal manures. Experiences with design, construction, and operation of a two-stage heated continuous-feed digester for a herd of 100 dairy cows are reported in this Bulletin. The publication contains discussions of the microbiological processes involved in the anaerobic digestion of organic materials;

S. P. E. Persson; R. W. Regan

1979-01-01T23:59:59.000Z

270

First Wall and Operational Diagnostics  

SciTech Connect

In this chapter we review numerous diagnostics capable of measurements at or near the first wall, many of which contribute information useful for safe operation of a tokamak. There are sections discussing infrared cameras, visible and VUV cameras, pressure gauges and RGAs, Langmuir probes, thermocouples, and erosion and deposition measurements by insertable probes and quartz microbalance. Also discussed are dust measurements by electrostatic detectors, laser scattering, visible and IR cameras, and manual collection of samples after machine opening. In each case the diagnostic is discussed with a view toward application to a burning plasma machine such as ITER.

Lasnier, C; Allen, S; Boedo, J; Groth, M; Brooks, N; McLean, A; LaBombard, B; Sharpe, J; Skinner, C; Whyte, D; Rudakov, D; West, W; Wong, C

2006-06-19T23:59:59.000Z

271

Underbalanced drilling in remedial operations  

Science Conference Proceedings (OSTI)

Operators are finding additional applications for underbalanced drilling (UBD) technology that deliver benefits besides faster, more trouble-free drilling and improved well productivity. Underbalanced workovers, completions and re-drills are being performed with impressive results. This article will describe some of the jobs and applications, and detail the special surface equipment being used to make this a success. This is the fifth in a series of articles on UBD technology and its rapid development in this field. The paper discusses deep gas wells in the Texas Panhandle, gas and condensate wells near Mobile, Alabama, and the Austin Chalk wells in Texas and Louisiana.

Cuthbertson, R.L.; Vozniak, J.

1997-06-01T23:59:59.000Z

272

Standards Working Groups - Safety and Operating ...  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Safety and Operating Environment Working Group. Scope: These two areas have been combined ...

2010-12-27T23:59:59.000Z

273

On Some Compatible Operations on Heyting Algebras  

Science Conference Proceedings (OSTI)

We study some operations that may be defined using the minimum operator in the context of a Heyting algebra. Our motivation comes from the fact that 1) already known compatible operations, such as the successor by Kuznetsov, the minimum dense by Smetanich ... Keywords: Heyting algebra, Intuitionistic logic, compatible operation

Rodolfo Cristian Ertola Biraben; Hernán Javier San Martín

2011-08-01T23:59:59.000Z

274

Annual Operation of Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

In 2009, many coal-fired generating units equipped with selective catalytic reduction (SCR) systems for nitrogen oxide (NOX) control will convert from seasonal to annual SCR operation. This report provides guidelines on how to prepare for annual operation. It focuses on existing experience with annual operation, catalyst management strategy, equipment reliability, cold weather issues, low load and cycling operation, and risk assessment.

2007-12-18T23:59:59.000Z

275

Monitoring of the electrical distribution network operation  

Science Conference Proceedings (OSTI)

Distribution network operation is determined by the behaviour of the load. To plan and analyse the electrical network operation, precise modelling of load is substantial. The adequate approach to understand the electrical distribution network operation ... Keywords: SCADA, busloads, distribution network, load monitoring, mathematical model of load, network operation monitoring, state estimation

Jako Kilter; Mati Meldorf

2009-02-01T23:59:59.000Z

276

Quarterly Selected Financial and Operating Data  

Reports and Publications (EIA)

Presents quarterly financial data and operating data for a consistent set of major energy companies.

Information Center

2010-11-23T23:59:59.000Z

277

ARM Climate Research Facility Radar Operations Plan  

SciTech Connect

Roles, responsibilities, and processes associated with Atmospheric Radiation Measurement (ARM) Radar Operations.

Voyles, JW

2012-05-18T23:59:59.000Z

278

BNL | ATF Operations Weekly Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Weekly Summary Operations Weekly Summary Week Starts E-beam Status CO2 Status 2013/12/30 Up time: 0 days Down time: 5 days Activity: Maintenance & holiday week Up time: 0 days Down time: 5 days (setup) Activity: OPA work & holiday week 2013/12/23 Up time: 1 days Down time: 4 days (holiday week) Exp: Beam Studies Group: ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days Activity: OPA work & holiday week 2013/12/16 Up time: Down time: Exp: AE-58, ERL BPM testing + beam studies Group: AE58, BNL (C-AD) / ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days (setup) Activity: OPA work, EUVL test setup (AE59) and maintenance 2013/12/09 Up time: Down time: Exp: AE-52, Beam Manipulation by self wakefield Group: AE52, Euclid techlabs Energy: 57.6 MeV

279

Stack Monitor Operating Experience Review  

Science Conference Proceedings (OSTI)

Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative “all modes” failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

L. C. Cadwallader; S. A. Bruyere

2009-05-01T23:59:59.000Z

280

Thailand gas project now operational  

SciTech Connect

Now operational, Phase 1 of Thailand's first major natural gas system comprises one of the world's longest (264 miles) offshore gas lines. Built for the Petroleum Authority of Thailand (PTT), this system delivers gas from the Erawan field in the Gulf of Thailand to two electrical power plants near Bangkok, operated by the Electricity Generating Authority of Thailand (EGAT). The project required laying about 360 miles of pipeline, 34-in., 0.625 in.-thick API-5LX-60 pipe offshore and 28-in., 0.406 in.-thick API-5LX-60 onshore. The offshore pipe received a coal-tar coating, a 3.5-5.0 in. concrete coating, and zinc sacrificial-anode bracelets. The onshore line was coated with the same coal-tar enamel and, where necessary, with concrete up to 4.5 in. thick. Because EGAT's two power plants are the system's only customers, no more pipeline will be constructed until deliveries, currently averaging about 100 million CF/day, reach the 250 million CF/day level. The project's second phase will include additional pipelines as well as an onshore distribution network to industrial customers.

Horner, C.

1982-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Coiled tubing - Operations and services  

Science Conference Proceedings (OSTI)

Drilling with a continuous (rather than jointed) drill string is an old concept that is gaining new attention as a result of recent advances made in coiled tubing and drilling technology. The development of larger diameter, reliable, high-strength coiled tubing and smaller diameter, positive displacement motors, orienting tools, surveying systems and fixed cutting drill bits have given drilling with a continuous drill string a capability that was previously unattainable. Like its many other uses, (e.g., squeeze cementing, wellbore cleanouts, flow initiation, logging) the continuity of coiled tubing gives it several advantages over conventional drill strings. These include: drilling underbalanced safely, significantly reduced trip time, continuous circulation, smaller surface requirements. Coiled tubing drilling operations have smaller surface lease requirements than most conventional rigs due to the smaller footprint of the coiled tubing unit and associated equipment. Current coiled tubing drilling operations have the following limitations: conventional rig assistance is required for well preparation; conventional rigs must assist in running long protective and production casing strings or liners; hole sizes are smaller; working depth capabilities are shallower, coiled tubing life is less. This paper goes on to discuss the history of continuous drill strings and includes information on tubing units, circulating systems, drilling fluids, well control systems, downhole tools, orientation tools, and bottomhole assemblies. It then gives a cost comparison and an application of this type of drilling.

Gronseth, J.M. (Imperial Oil Resources Ltd., Calgary, Alberta (Canada))

1993-04-01T23:59:59.000Z

282

Infrastructure and Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Operations | National Nuclear Security Administration Operations | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Infrastructure and Operations Home > About Us > Our Operations > Infrastructure and Operations Infrastructure and Operations NNSA's missions require a secure production and laboratory infrastructure meeting immediate and long term needs. The Associate Administrator for

283

Guide to good practices for operations turnover  

SciTech Connect

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

284

Definition: System Operating Limit | Open Energy Information  

Open Energy Info (EERE)

Operating Limit Operating Limit Jump to: navigation, search Dictionary.png System Operating Limit The value (such as MW, MVar, Amperes, Frequency or Volts) that satisfies the most limiting of the prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria. System Operating Limits are based upon certain operating criteria. These include, but are not limited to: Facility Ratings (Applicable pre- and post- Contingency equipment or facility ratings), Transient Stability Ratings (Applicable pre- and post-Contingency Stability Limits), Voltage Stability Ratings (Applicable pre- and post- Contingency Voltage Stability), System Voltage Limits (Applicable pre- and post- Contingency Voltage Limits)[1] Also Known As SOL

285

METHOD OF OPERATING NUCLEAR REACTORS  

DOE Patents (OSTI)

A method is presented for obtaining enhanced utilization of natural uranium in heavy water moderated nuclear reactors by charging the reactor with an equal number of fuel elements formed of natural uranium and of fuel elements formed of uranium depleted in U/sup 235/ to the extent that the combination will just support a chain reaction. The reactor is operated until the rate of burnup of plutonium equals its rate of production, the fuel elements are processed to recover plutonium, the depleted uranium is discarded, and the remaining uranium is formed into fuel elements. These fuel elements are charged into a reactor along with an equal number of fuel elements formed of uranium depleted in U/sup 235/ to the extent that the combination will just support a chain reaction, and reuse of the uranium is continued as aforesaid until it wlll no longer support a chain reaction when combined with an equal quantity of natural uranium.

Untermyer, S.

1958-10-14T23:59:59.000Z

286

Continuity of Operations Plan (COOP)  

NLE Websites -- All DOE Office Websites (Extended Search)

You are here: DOE-ID Home > COOP Continuity of Operations Plan (COOP) Call-In Number: 1-208-526-COOP (2667) or 1-877-DOE-DOE1 (1-877-363-3631) Wait for recording to start then Dial 382: If you are directed or forced to evacuate your current location to an alternate site, please contact us as soon as possible to advise us that you are safe and with a means of contacting you. This toll free or local number can be used by employees or their families to report their whereabouts or the whereabouts of another DOE-ID employee. Email Check-In: In addition to the call-in number, employees and families can report their status via a email check-in system. To access the email please click here. The email based check in system should only be used by DOE ID Employees.

287

Energy San Francisco Operations Office  

Office of Legacy Management (LM)

Depariment of ' Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation Post Office BOX 309 Canoga Park Dear 8 a CA 91304 G ers : Remedial action was taken to decontaminate the Hot Cave (Building 003) and Sodium Reactor Experiment (SRE) under Contract No. DE-AT03-76SF75008. The report of the post remedial survey, performed by Argonne National Laboratory, indicates that the levels of contamination are below the decontamination criteria agreed to between the State of California and DOE/SAN. Based on- this report and the enclosed letter from J. E. Baublitz to Dr. Wynveen, DOE/SAN is releasing for unrestricted use Building 003 and the SRE. Sincerely,

288

Buildings Operations and ETS Exposure  

E-Print Network (OSTI)

Mechanical systems are used in buildings to provide conditioned air, dissipate thermal loads, dilute contaminants, and maintain pressure differences. The characteristics of these systems and their operations have implications for the exposures of workers to environmental tobacco smoke (ETS) and for the control of these exposures. This review describes the general features of building ventilation systems and the efficacy of ventilation for controlling contaminant concentrations. Ventilation can reduce the concentration of ETS through dilution, but central heating, ventilating, and air conditioning (HVAC) can also move air throughout a building that has been contaminated by ETS. An understanding of HVAC systems is needed to develop models for exposures of workers to ETS.- Environ Health Perspect 107(Suppl 2):313-317 (1999).

John D. Spengler

1998-01-01T23:59:59.000Z

289

Reactor operation environmental information document  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) is a large United States Department of Energy installation on the upper Atlantic Coastal Plain of South Carolina. The SRS contains diverse habitats, flora, and fauna. Habitats include upland terrestrial areas, varied wetlands including Carolina Bays, the Savannah River swamp system, and impoundment related and riparian wetlands, and the aquatic habitats of several stream systems, two large cooling reservoirs, and the Savannah River. These diverse habitats support a large variety of plants and animals including many commercially or recreational valuable species and several rare, threatened or endangered species. This volume describes the major habitats and their biota found on the SRS, and discuss the impacts of continued operation of the K, L, and P production reactors.

Wike, L.D.; Specht, W.L.; Mackey, H.E.; Paller, M.H.; Wilde, E.W.; Dicks, A.S.

1989-12-01T23:59:59.000Z

290

Electro Catalytic Oxidation (ECO) Operation  

Science Conference Proceedings (OSTI)

The power industry in the United States is faced with meeting many new regulations to reduce a number of air pollutants including sulfur dioxide, nitrogen oxides, fine particulate matter, and mercury. With over 1,000 power plants in the US, this is a daunting task. In some cases, traditional pollution control technologies such as wet scrubbers and SCRs are not feasible. Powerspan's Electro-Catalytic Oxidation, or ECO{reg_sign} process combines four pollution control devices into a single integrated system that can be installed after a power plant's particulate control device. Besides achieving major reductions in emissions of sulfur dioxide (SO{sub 2}), nitrogen oxides (NOx), fine particulate matter (PM2.5) and mercury (Hg), ECO produces a highly marketable fertilizer, which can help offset the operating costs of the process system. Powerspan has been operating a 50-MW ECO commercial demonstration unit (CDU) at FirstEnergy Corp.'s R.E. Burger Plant near Shadyside, Ohio, since February 2004. In addition to the CDU, a test loop has been constructed beside the CDU to demonstrate higher NOx removal rates and test various scrubber packing types and wet ESP configurations. Furthermore, Powerspan has developed the ECO{reg_sign}{sub 2} technology, a regenerative process that uses a proprietary solvent to capture CO{sub 2} from flue gas. The CO{sub 2} capture takes place after the capture of NOx, SO{sub 2}, mercury, and fine particulate matter. Once the CO{sub 2} is captured, the proprietary solution is regenerated to release CO{sub 2} in a form that is ready for geological storage or beneficial use. Pilot scale testing of ECO{sub 2} began in early 2009 at FirstEnergy's Burger Plant. The ECO{sub 2} pilot unit is designed to process a 1-MW flue gas stream and produce 20 tons of CO{sub 2} per day, achieving a 90% CO{sub 2} capture rate. The ECO{sub 2} pilot program provided the opportunity to confirm process design and cost estimates, and prepare for large scale capture and sequestration projects. The objectives of this project were to prove at a commercial scale that ECO is capable of extended operations over a range of conditions, that it meets the reliability requirements of a typical utility, and that the fertilizer co-product can be consistently generated, providing ECO with an economic advantage over conventional technologies currently available. Further objectives of the project were to show that the ECO system provides flue gas that meets the inlet standards necessary for ECO{sub 2} to operate, and that the outlet CO{sub 2} and other constituents produced by the ECO{sub 2} pilot can meet Kinder-Morgan pipeline standards for purposes of sequestration. All project objectives are consistent with DOE's Pollution Control Innovations for Power Plants program goals.

Morgan Jones

2011-03-31T23:59:59.000Z

291

Computer Control of Boiler Operation  

E-Print Network (OSTI)

Rapidly rising energy costs present the opportunity for substantial cost savings through improved boiler combustion control. A process computer control system was installed at an Air Products & Chemicals facility in 1978. As a result the boiler efficiency has increased over 11%. The control system includes; air flow, fuel flow, pressure and drum level control. Air flow control is achieved through modulation of the F.D. fan inlet vanes. Demand for airflow is produced from a high signal selection of the steam pressure controller or the total fuel signal. The output of the oxygen controller is used to modify this airflow index by the desired air/fuel ratio. The air/fuel ratio is a polynomial function of the type of fuel used. In summary, the computer control system provides for; greater overall boiler stability, operation within tight air/gas limits, increased boiler efficiency, capability to burn multiple fuels, faster response to demand changes, and fewer shutdowns.

Pareja, G. E.

1981-01-01T23:59:59.000Z

292

Chicago Operations Office: Technology summary  

SciTech Connect

This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

Not Available

1994-12-01T23:59:59.000Z

293

STANDARD OPERATING PROTOCOLS FOR DECOMMISSIONING  

SciTech Connect

Decommissioning projects at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites are conducted under project-specific decision documents, which involve extensive preparation time, public comment periods, and regulatory approvals. Often, the decision documents must be initiated at least one year before commencing the decommissioning project, and they are expensive and time consuming to prepare. The Rocky Flats Environmental Technology Site (RFETS) is a former nuclear weapons production plant at which hazardous substances and wastes were released or disposed during operations. As a result of the releases, RFETS was placed on the National Priorities List in 1989, and is conducting cleanup activities under a federal facilities compliance agreement. Working closely with interested stakeholders and state and federal regulatory agencies, RFETS has developed and implemented an improved process for obtaining the approvals. The key to streamlining the approval process has been the development of sitewide decision documents called Rocky Flats Cleanup Agreement Standard Operating Protocols or ''RSOPs.'' RSOPs have broad applicability, and could be used instead of project-specific documents. Although no two decommissioning projects are exactly the same and they may vary widely in contamination and other hazards, the basic steps taken for cleanup are usually similar. Because of this, using RSOPs is more efficient than preparing a separate project-specific decision documents for each cleanup action. Over the Rocky Flats cleanup life cycle, using RSOPs has the potential to: (1) Save over 5 million dollars and 6 months on the site closure schedule; (2) Eliminate preparing one hundred and twenty project-specific decision documents; and (3) Eliminate writing seventy-five closure description documents for hazardous waste unit closure and corrective actions.

Foss, D. L.; Stevens, J. L.; Gerdeman, F. W.

2002-02-25T23:59:59.000Z

294

Definition: Operating Plan | Open Energy Information  

Open Energy Info (EERE)

Plan Plan Jump to: navigation, search Dictionary.png Operating Plan A document that identifies a group of activities that may be used to achieve some goal. An Operating Plan may contain Operating Procedures and Operating Processes. A company-specific system restoration plan that includes an Operating Procedure for black-starting units, Operating Processes for communicating restoration progress with other entities, etc., is an example of an Operating Plan.[1] Related Terms Operating Procedure, smart grid References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Operating_Plan&oldid=502599

295

Emergency Operations Training Academy | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Operations Training Academy | National Nuclear Security Operations Training Academy | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Emergency Operations Training Academy Home > About Us > Our Programs > Emergency Response > Training > Emergency Operations Training Academy Emergency Operations Training Academy Rotating image showing pictures of Classroom, Online and Hands on trainings

296

FTCP FY 2011 Operational Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N N N o o v v e e m m b b e e r r 2 2 0 0 1 1 0 0 U U . . S S . . D D E E P P A A R R T T M M E E N N T T O O F F E E N N E E R R G G Y Y F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 1 1 1 1 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N Federal Technical Capability Program FY 2011 Operational Plan November 2010 1 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The Department has identified guiding principles to accomplish that objective and identified four general functions of the Federal Technical Capability Program. The guiding principles are:  Federal personnel possess the experience, knowledge, skills, and abilities that are

297

Pacific Northwest National Laboratory Operated  

Office of Legacy Management (LM)

Pacific Pacific Northwest National Laboratory Operated by Battelle for the U .S. D ep artm ent of Energy PNWD-3914 Monticello Mill Tailings Site Macroinvertebrate Sampling for 2007 A.L. Bunn R.P. Mueller J.M. Brandenberger D .M. Wellman February 2008 Prepared for the U.S. Department of Energy under Contract DE-AC13-02GJ79491 DISCLAIMER This repon was prepared as an accoun t of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereo f, no r Battelle Memorial Institute, no r any of their employees, makes an y warranty, express or implie d, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, ap paratus, produ ct, or p roce ss di sclos ed, or represen ts that its use would not in frin ge privat ely owned rights . Reference herein to any specific comm ercial product, process,

298

Worldwide fallout from Operation Castle  

Science Conference Proceedings (OSTI)

A worldwide network of gummed-film stations was established to monitor fallout following Operation Castle. Although meteorological data were poor, a general connection of tropospheric flow patterns with observed fallout was evident. There was a tendency for debris to remain in tropical latitudes, with incursions into the temperate regions associated with meterological disturbances of the predominately zonal flow. As the season advanced, such incursions became more evident. Outside of the tropics, the southwestern United States received the greatest total fallout, about five times that received in Japan. The total world-wide fallout up to July 1, 1954, from the Castle series outside of the immediate test areas, is estimated to be about (censored) of the total fission activity produced. The maximum fallout on any day at an individual station in the United States, corrected to sampling day, was 200,000 d/m/sq. ft. It is concluded that the probability of early fallout in inhabited regions would be reduced by holding Pacific test series in the winter months.

List, R.J.

1984-08-31T23:59:59.000Z

299

FTCP FY 2009 Operational Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N N o o v v e e m m b b e e r r 2 2 0 0 0 0 8 8 U U . . S S . . D D E E P P A A R R T T M M E E N N T T O O F F E E N N E E R R G G Y Y F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 0 0 9 9 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N Federal Technical Capability Program FY 2009 Operational Plan November 2008 1 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The Department has identified guiding principles to accomplish that objective and identified four general functions of the Federal Technical Capability Program. The guiding principles are: * Federal personnel possess the experience, knowledge, skills, and abilities that are

300

Accelerator Operations and Technology, AOT: LANL  

NLE Websites -- All DOE Office Websites (Extended Search)

ADE Accelerator and Operations Technology, AOT ADE Accelerator and Operations Technology, AOT About Us AOT Home Groups Accelerator, Beam Science High Power Electrodynamics Instrumentation, Controls Mechanical Design Engineering Operations Radio Frequency Engineering CONTACTS Division Leader John Erickson Deputy Division Leader for Operations Martha Zumbro Deputy Division Leader for Technology Subrata Nath Administrator Jean N. Trujillo Phone: (505) 665-2683 Put a short description of the graphic or its primary message here Accelerator and Operations Technology The Accelerator and Operations Technology (AOT) Division at Los Alamos National Laboratory conducts fundamental and applied research and development needed to improve operations and operations support for the Los Alamos Neutron Science Center (LANSCE). AOT's R&D efforts include

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

California State University, Fullerton EMERGENCY OPERATIONS PLAN  

E-Print Network (OSTI)

California State University, Fullerton EMERGENCY OPERATIONS PLAN Revised March 2012 #12;Foreward The California State University's Emergency Operations Plan (EOP) defines the scope of preparedness and incident Presidential Directive (HSPS5), the National Incident Management System (NIMS), the California Standardized

de Lijser, Peter

302

Modular invariance for vertex operator superalgebras  

E-Print Network (OSTI)

We generalize Zhu's theorem on modular invariance of characters of vertex operator algebras (VOAs) to the setting of vertex operator superalgebras (VOSAs) with rational, rather than integer, conformal weights. To recover ...

Van Ekeren, Jethro (Jethro William)

2012-01-01T23:59:59.000Z

303

meeting summary: Second Northeast Regional Operational Workshop  

Science Conference Proceedings (OSTI)

The Second Northeast Regional Operational Workshop, focusing on hydrometeorology in the northeastern United States, was held 7–8 November 2000 in Albany, New York. Sessions in cold season events, warm season events, and operational techniques ...

Eugene P. Auciello

2001-05-01T23:59:59.000Z

304

15.761 Operations Management, Summer 2002  

E-Print Network (OSTI)

This course will introduce concepts and techniques for design, planning and control of manufacturing and service operations. The course provides basic definitions of operations management terms, tools and techniques ...

Rosenfield, Donald

2002-01-01T23:59:59.000Z

305

APS Beamline Station Operational Limits Information Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Listed below are the conditions for a beamline to be accepting beam for CommissioningOperations. These conditions have been placed by the AOD ADD for Operations based...

306

Sunday Creek—The CCOPE Operations Center  

Science Conference Proceedings (OSTI)

An operations center was designed for the Cooperative Convective Precipitation Experiment to facilitate the task of coordinating research activities. This paper describes the facilities of the center and the role of the operations team—consisting ...

C. J. Biter; Peter N. Johnson

1982-05-01T23:59:59.000Z

307

Revolutionizing standard operating procedures in biomanufacturing  

E-Print Network (OSTI)

In its quest to become a High Reliability Performance (HRP) organization, Amgen manufacturing operations desires to further improve its adherence to, and effectiveness of, its standard operating procedures (SOPs). SOPs are ...

Nag, Aditya

2013-01-01T23:59:59.000Z

308

Operating Experience Summary 2004-09  

NLE Websites -- All DOE Office Websites (Extended Search)

a forklift, operating in a congested area, backed into and damaged an electrical transformer. The forklift operator did not look behind him and did not have a spotter to assist...

309

For the B-Area Operable Unit  

NLE Websites -- All DOE Office Websites (Extended Search)

3 April 16, 2013 Notice of Availability Record of Decision For the B-Area Operable Unit The Record of Decision (ROD) Remedial Alternative Selection for the B-Area Operable Unit...

310

HFIR Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Operating Status of HFIR HFIR reactor building with sun and sky in background As of 13:19:50 10192013, Reactor Power is at 84 MW The reactor is currently operating at...

311

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display...

312

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly....

313

Effect of Operational Transients on Boiler Damage  

Science Conference Proceedings (OSTI)

It is increasingly the case that utility systems demand more flexibility in a unit's ability to respond to dispatch requirements, which can create a conflict between maximizing efficient operation and limiting damage accumulation. A boiler can be operated in various cycling modes and can be subjected to planned and unplanned transients associated with load following, minimum load operation, forced cooling, variable pressure operation, increased ramp rates, increased attemperation, over-temperature operat...

2009-03-24T23:59:59.000Z

314

WRAP Trupact Loading System Operational Test Procedure  

Science Conference Proceedings (OSTI)

This procedure has been prepared to verify the TRUPACT System (TS) operates in accordance with system design and specifications.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

315

Tank Farm Operations Surveillance Automation Analysis  

Science Conference Proceedings (OSTI)

The Nuclear Operations Project Services identified the need to improve manual tank farm surveillance data collection, review, distribution and storage practices often referred to as Operator Rounds. This document provides the analysis in terms of feasibility to improve the manual data collection methods by using handheld computer units, barcode technology, a database for storage and acquisitions, associated software, and operational procedures to increase the efficiency of Operator Rounds associated with surveillance activities.

MARQUEZ, D.L.

2000-12-21T23:59:59.000Z

316

NIF's Operations Support Building awarded LEED certification...  

NLE Websites -- All DOE Office Websites (Extended Search)

NIF's Operations Support Building awarded LEED certification | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

317

Modeling of Copper Converter Foamover and Operational ...  

Science Conference Proceedings (OSTI)

ESP Dust Recovery Process Test Works, Plant Trial, Commissioning, Operations and Metallurgical Performance · Expansion and Collapse of Liquid Aluminum ...

318

Advance In system Materials Processing Operations  

Science Conference Proceedings (OSTI)

ESP Dust Recovery Process Test Works, Plant Trial, Commissioning, Operations and Metallurgical Performance · Expansion and Collapse of Liquid Aluminum ...

319

Environmentally Safe Operation of Barometric Condensers  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Environmentally Safe Operation of ...

320

Critical Operating Constraints Forecast-- Functional Specification  

Science Conference Proceedings (OSTI)

Critical operating constraints that could result in curtailments of load may occur in a transmission grid with areas of potential generation deficit and limited transmission import capacities. In such situations, it is crucial that the grid operators have a tool to predict when and where critical operating constraints would occur. This report describes the functional specification of such a decision support tool, called the COCF (Critical Operating Constraint Forecast).

2008-03-04T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NIST: Methane Symmetry Operations - Nuclear spin functions  

Science Conference Proceedings (OSTI)

Methane Symmetry Operations. 9. Symmetry Properties of Laboratory-Fixed Nuclear Spin Functions, Nuclear Spin Statistics, and Parities. ...

322

Office of Administrative Operations (GC-90)  

Energy.gov (U.S. Department of Energy (DOE))

John D. (Dan) Bullington, Director of Administrative Operations 202-586-7364dan.bullington@hq.doe.gov

323

North Carolina Refinery Operable Atmospheric Crude Oil ...  

U.S. Energy Information Administration (EIA)

North Carolina Refinery Operable Atmospheric Crude Oil Distillation Capacity as of January 1 (Barrels per Calendar Day)

324

Blending implicit shapes using fuzzy set operations  

Science Conference Proceedings (OSTI)

Implicit modelling is a powerful technique to design geometric shapes, where a geometric object is described by a real function. In general, the real functions used in implicit modelling are unbounded and can take any values in space R. In general, ... Keywords: blending operations, fuzzy sets, generalized algebraic operations, implicit curves and surfaces, isosurfaces, piecewise algebraic operations, soft computing

Qingde Li; Jie Tian

2008-07-01T23:59:59.000Z

325

Void Fraction Instrument operation and maintenance manual  

SciTech Connect

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

326

Drilling and operating geothermal wells in California  

SciTech Connect

The following procedural points for geothermal well drilling and operation are presented: geothermal operators, definitions, geothermal unit, agent, notice of intention, fees, report on proposed operations, bonds, well name and number, well and property sale on transfer, well records, and other agencies. (MHR)

1979-01-01T23:59:59.000Z

327

A Concurrent General Purpose Operator Interface  

Science Conference Proceedings (OSTI)

Compact interactive control consoles are rephcing traditional control rooms as operator interfaces for physical processes. In the irust major application of concurrent programming outside the area of operating systems, this paper presents a design for ... Keywords: Computer graphics, Concurrent Pascal, concurrent programming, interactive system, man-machine interface, operator interface, process control

Neil B. Corrigan; J. Denbigh Starkey

1984-11-01T23:59:59.000Z

328

Base line estimation using sparse nonlinear operators  

Science Conference Proceedings (OSTI)

Efficient nonlinear operators for base line estimation of high energy physics detector signals are introduced. Due to the high processing rate requirements the operators are simplified using sparse input sequences. The operators are a sparse order statistic ... Keywords: base line estimation, filter training, order statistic filter

Sami J. Inkinen; Yrjö Neuvo

2002-05-01T23:59:59.000Z

329

Operational state complexity of nested word automata  

Science Conference Proceedings (OSTI)

We introduce techniques to prove lower bounds for the number of states needed by finite automata operating on nested words. We study the state complexity of Boolean operations and obtain lower bounds that are tight within an additive constant. The results ... Keywords: Finite automata, Language operations, Nested words, State complexity

Xiaoxue Piao; Kai Salomaa

2009-08-01T23:59:59.000Z

330

Wireless sensor network operating systems: a survey  

Science Conference Proceedings (OSTI)

The design of operating system for Wireless Sensor Network (WSN) deviates from the traditional operating system design due to their specific characteristics like constrained resources, high dynamics and inaccessible deployment environments. We ... Keywords: TinyOS, WSN operating systems, WSNs, ad-hoc networks, applications, characteristics, classification framework, design, embedded systems, reprogramming, survey, virtual machines, wireless networks, wireless sensor networks

Adi Mallikarjuna V. Reddy; A.V.U. Phani Kumar; D. Janakiram; G. Ashok Kumar

2009-08-01T23:59:59.000Z

331

FTCP FY 2010 Operational Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D D e e c c e e m m b b e e r r 2 2 0 0 0 0 9 9 ( (R Re ev vi is se ed d A Ap pr ri il l 2 20 01 10 0) ) U U . . S S . . D D E E P P A A R R T T M M E E N N T T O O F F E E N N E E R R G G Y Y F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 1 1 0 0 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N Federal Technical Capability Program FY 2010 Operational Plan December 2009 (Rev 1, April 2010) 1 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The Department has identified guiding principles to accomplish that objective and identified four general functions of the Federal Technical Capability Program. The guiding principles are:

332

Auction market simulator for price based operation  

Science Conference Proceedings (OSTI)

Through the passage of new public utility regulatory policies, the Federal Energy Regulatory Commission (FERC) encourages an open market system for price based operation. A previous paper describes a framework for price based operation and the associated technical issues in an auction market structure. This paper presents an auction market simulator to experimentally study the aspects of power system operation in price-based environment. The proposed simulator can also be used as a tool to train the system operators how to perform electric power transaction in the deregulated environment. This paper presents the simulation results of auction market for price based operation in the 24-bus, 10-generator IEEE Reliability Test System.

Kumar, J.; Sheble, G. [Iowa State Univ., Ames, IA (United States). Dept. of Electrical and Computer Engineering

1998-02-01T23:59:59.000Z

333

Training new operators - the first six months  

Science Conference Proceedings (OSTI)

The Fermilab Operations Department takes about two years to train a new Operator. The Operator's introductory (Concepts) On-the-Job-Training (OJT) gives him or her an overview of the laboratory, teaches the basic facts about all the accelerators, and it also teaches the new operator the training process used for all the rest of their OJT training. The Concepts OJT takes about four to six months for most people to complete. This paper will explain how this first six months of training sets the new employee on their path to becoming a fully trained Operator.

Worthel, B.; /Fermilab

2010-04-01T23:59:59.000Z

334

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

335

Definition: Operating Reserve | Open Energy Information  

Open Energy Info (EERE)

Operating Reserve Operating Reserve Jump to: navigation, search Dictionary.png Operating Reserve That capability above firm system demand required to provide for regulation, load forecasting error, equipment forced and scheduled outages and local area protection. It consists of spinning and non-spinning reserve.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the largest generator plus a fraction of the peak load. The operating reserve

336

AG Plus Co operative | Open Energy Information  

Open Energy Info (EERE)

Plus Co operative Plus Co operative Jump to: navigation, search Name AG Plus Co-operative Place SE Kindred, North Dakota Zip 58051 Product Cooperative offering membership stock to agricultural producers. Set up to assist with the financing of a soybean crushing plant in the town of Kindred. References AG Plus Co-operative[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. AG Plus Co-operative is a company located in SE Kindred, North Dakota . References ↑ "AG Plus Co-operative" Retrieved from "http://en.openei.org/w/index.php?title=AG_Plus_Co_operative&oldid=341858" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes

337

College of Emergency Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Operations Emergency Operations College of Emergency Operations College of Emergency Operations Vision The Emergency Operations Training Academy (EOTA) will be recognized as the model technical training provider for DOE emergency operations personnel, while expanding its customer base to include other designated government and private-sector national and international organizations that require professional training, education, and vocational services. In this expanded role, the Academy will be a vital training asset for DOE and the nation. Roles Provide training analysis, development, and delivery support to the Office of Emergency Operations (NA-40), act in an advisory role in training oriented initiatives, provide access to emergency management/response training throughout the DOE/NNSA complex, support outreach via

338

Reproducing kernels of Sobolev spaces via a green kernel approach with differential operators and boundary operators  

Science Conference Proceedings (OSTI)

We introduce a vector differential operator P and a vector boundary operator B to derive a reproducing kernel along with its associated Hilbert space which is shown to be embedded in a ... Keywords: 41A30, 65D05, Boundary operator, Differential operator, Eigenfunction, Eigenvalue, Green kernel, Reproducing kernel

Gregory E. Fasshauer; Qi Ye

2013-05-01T23:59:59.000Z

339

Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.  

SciTech Connect

The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

Columbia River System Operation Review (U.S.)

1994-02-01T23:59:59.000Z

340

Hydro Stakeholder Collaboration and Public Involvement Planning Case Studies  

Science Conference Proceedings (OSTI)

This report describes nine utility case applications of the hydro stakeholder communications and public involvement tools presented in a recent EPRI report. The resulting experience can assist utilities in developing an effective public outreach program that will pay off in long-term public support for hydro relicensing and operations.

1998-03-06T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

342

Idaho Operations Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Operations Idaho Operations Office Idaho Operations Office Idaho Operations Office INL combines the expertise of government, industry and academia in a single laboratory under the leadership of Battelle Energy Alliance (BEA), a team comprised of Battelle Memorial Institute, Washington Group International, BWXT Services, Inc., the Electric Power Research Institute and Massachusetts Institute of Technology. BEA manages the laboratory under a Management and Operating contract. This contract requires: Safe and efficient operation of all INL facilities. Cost reduction by better use of existing facilities and elimination of under-utilized or unneeded facilities. More cost effective accomplishment of mission objectives by use of upgraded and new infrastructure. The ongoing effort needed to maintain federal facilities and infrastructure

343

Definition: Optimized Generator Operation | Open Energy Information  

Open Energy Info (EERE)

Optimized Generator Operation Optimized Generator Operation Jump to: navigation, search Dictionary.png Optimized Generator Operation Better forecasting and monitoring of load and grid performance would enable grid operators to dispatch a more efficient mix of generation that could be optimized to reduce cost. The coordinated operation of energy storage, distributed generation, or plug-in electric vehicle assets could also result in completely avoiding central generation dispatch.[1] Related Terms sustainability References ↑ SmartGrid.gov 'Description of Benefits' An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Optimized_Generator_Operation&oldid=502509" Categories:

344

Provincial Operating Standards (Ontario) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Provincial Operating Standards (Ontario) Provincial Operating Standards (Ontario) Provincial Operating Standards (Ontario) < Back Eligibility Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Utility Program Info Start Date 1/24/2002 State Ontario Program Type Environmental Regulations Fees Safety and Operational Guidelines Siting and Permitting Provider Ontario Ministry of Natural Resources The Provincial Operating Standards set the technical minimum requirements for cover wells and works regulated under the Oil, Gas and Salt Resources Act. These standards are the minimum requirements for the design, installation, operation, abandonment and safety of wells and works, but are not intended for use as a design handbook. In addition, the Standards outline the permitting process for injection

345

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Operations Office Idaho Operations Office Categorical Exclusion Determinations: Idaho Operations Office Categorical Exclusion Determinations issued by Idaho Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010699: Categorical Exclusion Determination North Boulevard Annex Lease Termination CX(s) Applied: B1.24 Date: 07/11/2013 Location(s): Idaho Offices(s): Idaho Operations Office July 11, 2013 CX-010698: Categorical Exclusion Determination Modeling and Validation of Sodium Plugging for Heat Exchangers in Sodium-cooled Fast Reactor Systems CX(s) Applied: B3.6 Date: 07/11/2013 Location(s): Illinois Offices(s): Idaho Operations Office June 25, 2013 CX-010701: Categorical Exclusion Determination Materials and Fuels Complex Diversion Dam CX(s) Applied: B2.5 Date: 06/25/2013

346

Operating Permits (New Jersey) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating Permits (New Jersey) Operating Permits (New Jersey) Operating Permits (New Jersey) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State New Jersey Program Type Siting and Permitting Provider Department of Environmental Protection The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure that no person shall use or

347

Definition: Operating Procedure | Open Energy Information  

Open Energy Info (EERE)

Procedure Procedure Jump to: navigation, search Dictionary.png Operating Procedure A document that identifies specific steps or tasks that should be taken by one or more specific operating positions to achieve specific operating goal(s). The steps in an Operating Procedure should be followed in the order in which they are presented, and should be performed by the position(s) identified. A document that lists the specific steps for a system operator to take in removing a specific transmission line from service is an example of an Operating Procedure.[1] Related Terms transmission lines, transmission line References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from

348

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operations Savannah River Operations Office Categorical Exclusion Determinations: Savannah River Operations Office Categorical Exclusion Determinations issued by Savannah River Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 10, 2013 CX-010669: Categorical Exclusion Determination 484-17D Coal Yard Remediation CX(s) Applied: B6.1 Date: 06/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010836: Categorical Exclusion Determination Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3

349

Chapter 10: Education, Training, and Operation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Education, : Education, Training, and Operation Building Occupant and Operator Roles Information for Facilities Managers and Maintenance Staff Information for Building Users Post-Occupancy Evaluation LANL | Chapter 10 Building Occupant and Operator Roles The success of a high-performance building depends Communicating the building's sustainability vision and Education, Training, how it is designed, built, and managed. Many of the features can imbue its managers and users with a sense and Operation most important sustainable design goals relate to of pride that can reinforce the commitment to low- resource use and pollution from building operations. If impact, high-performance operations. The hand-off the facility managers are not well-informed and actively from the building delivery team to the ones who will

350

Integrating Equipment Health Information Into Grid Operations  

Science Conference Proceedings (OSTI)

In recent years, grid operators have expressed keen interest in having equipment health information available in real time. The health status of critical power system equipment can help operators assess situations, identify associated risks, and develop mitigation strategies/solutions in a time frame commensurate with the risk level. Health status information can also help operators recognize potential failures and take proactive actions, such as unloading a transformer or breaker that has shown signs of...

2011-12-21T23:59:59.000Z

351

Primer on Flexible Operations in Fossil Plants  

Science Conference Proceedings (OSTI)

This primer describes the significant changes that have occurred over the past decade in the duty cycles of fossil power plants and the implications for plant equipment and costs. These changes include the increasing shift in coal-fired and natural-gas-fired power plants from high-capacity-factor, baseloaded operation to various modes of flexible operation, including load-following and low-load operation. ...

2013-09-27T23:59:59.000Z

352

WRAP TRUPACT loading systems operational test report  

SciTech Connect

This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

353

Impact of Operating Factors on Boiler Availability  

Science Conference Proceedings (OSTI)

As utilities strive to achieve higher reliability and lower operation and maintenance (O&M) costs for their fossil-fired power plants, changing plant operating conditions will provide even greater challenges in meeting those objectives. This report summarizes the cause and effect relationships that exist between operating conditions and boiler component reliability. It is an initial step in developing the tools and technology that will enable utilities to meet their objectives in an ever more competitive...

2000-12-19T23:59:59.000Z

354

Digital computer operation of a nuclear reactor  

DOE Patents (OSTI)

A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state.

Colley, R.W.

1982-06-29T23:59:59.000Z

355

Digital computer operation of a nuclear reactor  

DOE Patents (OSTI)

A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state.

Colley, Robert W. (Richland, WA)

1984-01-01T23:59:59.000Z

356

Magnet operating experience review for fusion applications  

Science Conference Proceedings (OSTI)

This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries.

Cadwallader, L.C.

1991-11-01T23:59:59.000Z

357

CAST SHOP TECHNOLOGY: II: Equipment and Operations  

Science Conference Proceedings (OSTI)

The paper discusses important criteria for the optimum energy and melt rate ... Hydro Aluminium embarked on an extensive R & D thin gauge casting program in ...

358

Operations Authorization Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

359

Safety and Operational Guidelines | Open Energy Information  

Open Energy Info (EERE)

Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon Safety and Operational Guidelines Jump to: navigation, search This article is a stub. You can...

360

Cone Drive Operations Inc | Open Energy Information  

Open Energy Info (EERE)

worm gear technology. The company supplies azimuth and elevation drives for solar tracking applications. References Cone Drive Operations Inc1 LinkedIn Connections CrunchBase...

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Headquarters Security Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Security Operations Headquarters Security Operations Headquarters Security Operations Mission The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive. The Office is the database owner for the principal personnel security information processing activities of the Department and personnel security administrative review process.

362

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM® (Decision Support for ...

363

Radio Frequency Engineering, MDE, Accelerator Operations and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Teams Low-Level Radio Frequency Magnet Power Supplies, Pulsed Power Radio Frequency, High Voltage Technologies Radio Frequency Operations CONTACTS Group Leader Dan Rees Deputy...

364

Adding control to arbitrary unknown quantum operations  

E-Print Network (OSTI)

While quantum computers promise significant advantages, the complexity of quantum algorithms remains a major technological obstacle. We have developed and demonstrated an architecture-independent technique that simplifies adding control qubits to arbitrary quantum operations-a requirement in many quantum algorithms, simulations and metrology. The technique is independent of how the operation is done, does not require knowledge of what the operation is, and largely separates the problems of how to implement a quantum operation in the laboratory and how to add a control. We demonstrate an entanglement-based version in a photonic system, realizing a range of different two-qubit gates with high fidelity.

Xiao-Qi Zhou; Timothy C. Ralph; Pruet Kalasuwan; Mian Zhang; Alberto Peruzzo; Benjamin P. Lanyon; Jeremy L. O'Brien

2010-06-14T23:59:59.000Z

365

Jankovic setting operational exposure limit.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Exposure Guides for the Operational Exposure Guides for the Assessment and Control of Nano Assessment and Control of Nano Materials at CNMS Materials at CNMS NSRC Symposium NSRC...

366

Our Operations | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

and operations programs and policies. Administration Programs Management and Budget NNSA's Office of Management and Administration's goal is to create a well-managed,...

367

Global and Regional Solutions | Research Operation Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety & Health (ES&H) aspects of its operations and activities by maintaining an Environmental Management System in conformance with ISO Standard 14001, and an...

368

Joint minimization with alternating Bregman proximity operators  

E-Print Network (OSTI)

Dec 28, 2004 ... Joint minimization with alternating Bregman proximity operators. H. H. Bauschke (hbauschk ***at*** uoguelph.ca) P. L. Combettes (plc ***at*** ...

369

Energy & Utilities, Facilities & Operations Directorate, Brookhaven...  

NLE Websites -- All DOE Office Websites (Extended Search)

Homepage The Energy & Utilities (EU) Division operates and maintains BNL's: Electric Distribution System; Central Steam Facility; Central Chilled Water Facility; Potable Water...

370

Building Technologies Office: Operate and Maintain Efficient...  

NLE Websites -- All DOE Office Websites (Extended Search)

strategy for improving energy efficiency in commercial buildings. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices....

371

Renewables and Efficiency in State Facilities & Operations  

Energy.gov (U.S. Department of Energy (DOE))

In May 2006, Hawaii’s governor signed HB 2175 addressing renewable energy, energy efficiency, and alternative fuels in state facilities and operations. This legislation also detailed requirements...

372

Electric grid operators monitoring drought conditions - Today ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration ... solar, wind , geothermal ... lower water levels are a potential concern for grid operators and system planners during periods of ...

373

Nuclear Facility Operations | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Operations Office oversees these contract activities in accordance with DOE directives. INL is a multi-program laboratory In addition to enabling the Office of Nuclear...

374

15.769 Operations Strategy, Fall 2005  

E-Print Network (OSTI)

The class provides a unifying framework for analyzing strategic issues in manufacturing and service operations. Relationships between manufacturing and service companies and their suppliers, customers, and competitors are ...

Rosenfield, Donald

375

Wastewater Construction and Operation Permits (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

376

Low Power Operation at Aluminium Dunkerque Smelter  

Science Conference Proceedings (OSTI)

Presentation Title, Low Power Operation at Aluminium Dunkerque Smelter ... took place in the substation and have limited the maximum substation capacity at ...

377

Wavelet based analysis of circuit breaker operation  

E-Print Network (OSTI)

Circuit breaker is an important interrupting device in power system network. It usually has a lifetime about 20 to 40 years. During breaker's service time, maintenance and inspection are imperative duties to achieve its reliable operation. To automate the diagnostic practice for circuit breaker operation and reduce the utility company's workload, Wavelet based analysis software of circuit breaker operation is developed here. Combined with circuit breaker monitoring system, the analysis software processes the original circuit breaker information, speeds up the analysis time and provides stable and consistent evaluation for the circuit breaker operation.

Ren, Zhifang Jennifer

2006-05-01T23:59:59.000Z

378

BNL | Center for Functional Nanomaterials Operations Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

BES Safety Management System Quality Management Small Science Nano Safety Reference Guide Organizational Responsibilities CFN Director Emilio Mendez Operations Manager Robert...

379

,"Texas Underground Natural Gas Storage - All Operators"  

U.S. Energy Information Administration (EIA) Indexed Site

,"Workbook Contents" ,"Texas Underground Natural Gas Storage - All Operators" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of...

380

Development Operations Hypersaline Geothermal Brine Utilization...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Development Operations Hypersaline Geothermal Brine Utilization Imperial...

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Office of Headquarters Security Operations - Headquarters Facilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Headquarters Security Operations HomeIntroduction Physical Security Limited Areas and Vault-Type Rooms Personnel Security Foreign Ownership, Control or Influence; Facility...

382

Office of Headquarters Security Operations: Headquarters Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

Headquarters Security Operations Home Sub Offices HQ Security Officers (HSO) Program Office of Information Security Office of Headquarters Personnel Office of...

383

Office of Headquarters Security Operations: Headquarters Access...  

NLE Websites -- All DOE Office Websites (Extended Search)

Headquarters Security Operations Home Sub Offices HQ Security Officers (HSO) Program Office of Information Security Office of Headquarters Personnel Office of...

384

Office of Security Operations: Director's Message  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Executive Protection Home Sub Offices HQ Security Officers (HSO) Program Office of Security Operations Office of Information Security Office of...

385

Office of Special Operations: Mission and Functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Executive Protection Home Sub Offices HQ Security Officers (HSO) Program Office of Security Operations Office of Information Security Office of...

386

Safe Operation of Backup Power Generators (Spanish)  

E-Print Network (OSTI)

It is important to know how to operate backup power generators safely. The tips in this publication can prevent problems with CO poisoning, electrocution, fire and other hazards.

Smith, David

2006-04-19T23:59:59.000Z

387

Safe Operation of Backup Power Generators  

E-Print Network (OSTI)

It is important to know how to operate backup power generators safely. The tips in this publication can prevent problems with CO poisoning, electrocution, fire and other hazards.

Smith, David

2006-04-19T23:59:59.000Z

388

Midwest Independent Transmission System Operator | Open Energy...  

Open Energy Info (EERE)

Name Midwest Independent Transmission System Operator Place Carmel, IN References SGIC1 No information has been entered for this organization. Add Organization This article is a...

389

REAL TIME SYSTEM OPERATIONS 2006-2007  

E-Print Network (OSTI)

OPERATIONS Prepared For: California Energy Commission PublicEnergy Research (PIER) California Energy Commission Jamiework sponsored by the California Energy Commission. It does

Eto, Joseph H.

2008-01-01T23:59:59.000Z

390

Operations and maintenance reports | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

from an expert Take a comprehensive approach Operations and maintenance reports ENERGY STAR Building Upgrade Manual Install renewable energy systems Save water to save energy...

391

Definition: Generator Operator | Open Energy Information  

Open Energy Info (EERE)

Services.1 Related Terms Interconnected Operations Service References Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up...

392

Definition: Interconnected Operations Service | Open Energy Informatio...  

Open Energy Info (EERE)

operation of interconnected Bulk Electric Systems.1 Also Known As IOS Related Terms transmission lines, energy, transmission line, transmission service References ...

393

NIST: Methane Symmetry Operations - Td Symmetry Species  

Science Conference Proceedings (OSTI)

Table of Contents Methane Symmetry Operations. 11. ... Magnetic-dipole transitions are observed in molecular-beam studies of methane [42]. ...

394

Business Operations Directorate, Brookhaven National Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

and environmental sciences, as well as in energy technologies and national security. Brookhaven Lab also builds and operates major scientific facilities available to university,...

395

Dialogue 3: Strategies for Sustainable Institute Operations  

Science Conference Proceedings (OSTI)

... Dialogue 3: Strategies for Sustainable Institute Operations ... 3. What measures could assess progress of an Institute towards being self-sustainable? ...

2012-11-13T23:59:59.000Z

396

,"California Underground Natural Gas Storage - All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","California Underground Natural Gas Storage - All Operators",3,"Annual",2012,"6301967"...

397

EQUIPMENT OPERATOR TRAINING IN THE AGE OF ...  

Science Conference Proceedings (OSTI)

... Two distinctively different operators, an “Expert” (E) and an “Apprentice” (A), were given the task to dig in the soil box under similar conditions. ...

2003-03-14T23:59:59.000Z

398

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

399

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

400

Investigation on Operating Characteristics of RGB LEDs.  

E-Print Network (OSTI)

??This thesis seeks to gain a better understanding on operating characteristics of the three primary color light emitting diode (LED). By applying direct, pulse and… (more)

Liao, Chi-nan

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Operational Issues at the Environmental Restoration Disposal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF is operated by Stoller Corporation (Stoller) under subcontract to Washington Closure Hanford (WCH). Currently, six disposal cells comprise the ERDF, with four more...

402

Chicago Operations Office 9800 South Cass Avenue  

Office of Legacy Management (LM)

. i-. .* ;+ ,.- Department of Energy Chicago Operations Office 9800 South Cass Avenue Argonne, Illinois 60439 : *- I (jr-. -rCILC-. .-WI James L. Liverman, Acting...

403

ICDF Complex Operations Waste Management Plan  

SciTech Connect

This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

W.M. Heileson

2006-12-01T23:59:59.000Z

404

Synchronous operation of the BLDC motor  

E-Print Network (OSTI)

The brushless de (BLDC) motor is becoming widely used and popular in the small horsepower motor applications. Factors such as simplicity in control, low cost, high efficiency, low frame size, high torque per inertia, high power density and, most importantly, being br-ushless are the reasons that make the BLDC motor very attractive in motor drive applications. In this research a systematic approach to synchronous operation of the brushless DC (BLDC) motor has been investigated and implemented. This thesis establishes principles of synchronous operation of the BLDC motor, develops stable operating conditions, derives the required implementation formulas and introduces some new definitions. The synchronous system follows, open loop, a speed command. The system has been provided by two input references: current and speed. The current reference throughout the operation has been kept constant at the maximum applicable continuous current to obtain maximum torque. Current regulation has been achieved by hysteresis current control. The speed reference has been varied from zero speed to the desired speed linearly. Once speed reaches to the desired speed, it is kept constant at the desired speed. Since the motor operates synchronously and no position information has been used, the motor has to follow exactly the reference speed, otherwise pull out occurs. By this implementation, three operating points of the BLDC motor with synchronous operational system has been presented. One of the three operating points at maximum speed corresponds to maximum load operation.

Guzelgunler, Yilcan

1998-01-01T23:59:59.000Z

405

,"Texas Underground Natural Gas Storage - All Operators"  

U.S. Energy Information Administration (EIA) Indexed Site

,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Texas Underground Natural Gas Storage - All Operators",3,"Annual",2012,"6301967" ,"Release...

406

Geothermal: Sponsored by OSTI -- Regional operation research...  

Office of Scientific and Technical Information (OSTI)

operation research program for development of geothermal energy in the southwest United States. Final technical report, June 1977--August 1978 Geothermal Technologies Legacy...

407

Empowering Operations and Maintenance through Wireless  

Science Conference Proceedings (OSTI)

Presentation Title, Empowering Operations and Maintenance through Wireless. Author(s), Neil Freeman, Soroush Amidi, David Fisk. On-Site Speaker (Planned)

408

Field Operation Program - Neighborhood Electric Vehicle Fleet...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Neighborhood Electric Vehicle Fleet Use J. Francfort M. Carroll July 2001 United States Department of Energy INEELEXT-01-00864 Field Operations Program...

409

Demonstration Development Project: Plant Operational Flexibility  

Science Conference Proceedings (OSTI)

This report provides a summary of the EPRI Generation Sector initiative on flexible plant operations through 2012. The initiative objectives are to identify industry research needs related to increased flexible operation, to coordinate the sector research, and to communicate with stakeholders within the Electric Power Research Institute (EPRI) and the advisory structure. A detailed review of the Generation Sector ...

2012-12-12T23:59:59.000Z

410

CCCaaallllll fffooorrr PPPaaapppeeerrrsss Annals of Operations Research  

E-Print Network (OSTI)

CCCaaallllll fffooorrr PPPaaapppeeerrrsss Annals of Operations Research Special Volume: ORP3-OR of Operations Research seeks submissions for a special volume ORP3-OR for Young Researchers and Practitioners presented at ORP3 conference together but also others including at least one young author (papers can

411

Networkcentric healthcare operations: the telecommunications structure  

Science Conference Proceedings (OSTI)

Healthcare globally is failing to meet its objectives of delivering appropriate medical attention to patients. We suggest that by adopting a networkcentric approach healthcare operations and delivery will be dramatically enhanced with the ultimate beneficiary ... Keywords: IC2T, e-health, global healthcare, healthcare management, healthcare operations, information technology, internet, medical information systems, mobile communications, networkcentric healthcare, networking, telecommunications, wireless communications

Dag Von Lubitz; Nilmini Wickramasinghe; Gennady Yanovsky

2006-01-01T23:59:59.000Z

412

SEARCH NAVIGATE REFINE PERSONALIZE SAVE SEARCH OPERATORS  

E-Print Network (OSTI)

SEARCH NAVIGATE REFINE PERSONALIZE SAVE SEARCH OPERATORS Search using AND, OR, NOT, and SAME (same sentence) to create logical search state- ments. Nest search operators inside parentheses. Search exact Web of Science® Quick Reference Card Search over 9,200 journals from over 45 different languages

Russell, Lynn

413

An operational link between MUBs and SICs  

E-Print Network (OSTI)

We exhibit an operational connection between mutually unbiased bases and symmetric infomationally complete positive operator-valued measures. Assuming that the latter exists, we show that there is a strong link between these two structures in all prime power dimensions. We also demonstrate that a similar link cannot exists in dimension 6.

Roberto Beneduci; Tom Bullock; Paul Busch; Claudio Carmeli; Teiko Heinosaari; Alessandro Toigo

2013-06-25T23:59:59.000Z

414

Intelligent pairing assistant for air operation centers  

Science Conference Proceedings (OSTI)

Within an Air Operations Center (AOC), planners make crucial decisions to create the air plan for any given day. They are expected to complete the plan in part by pairing targeting or collection tasks with the available platforms. Any assistance these ... Keywords: air operations center, intelligent user interface, pairing, reinforcement learning

Jeremy Ludwig; Eric Geiselman

2012-02-01T23:59:59.000Z

415

What middleware for network centric operations?  

Science Conference Proceedings (OSTI)

The main intent of this paper is to address the issue of middleware in network centric operations. To this end, we characterize a set of Information Technology capabilities that such a middleware should implement. Afterwards, we will discuss the design ... Keywords: Analysis, Data and service integration, Decision support, Display, Information technology, Middleware, Monitoring, Network centric operations, Optimization

Ali Benssam; Jean Berger; Abdeslem Boukhtouta; Mourad Debbabi; Sujoy Ray; Abderrazak Sahi

2007-04-01T23:59:59.000Z

416

Advanced Graphics for Power System Operation  

Science Conference Proceedings (OSTI)

The secure operation of an electric utility system with its many interconnections presents a complex problem, with large quantities of data to be processed at the system control center. EPRI investigators have developed a new graphical user interface that will enable power system operators to perform tasks more accurately and quickly.

1994-06-23T23:59:59.000Z

417

Convergence acceleration operator for multiobjective optimization  

Science Conference Proceedings (OSTI)

A convergence acceleration operator (CAO) is described which enhances the search capability and the speed of convergence of the host multiobjective optimization algorithm. The operator acts directly in the objective space to suggest improvements to solutions ... Keywords: evolutionary multiobjective optimization, neural networks

Salem F. Adra; Tony J. Dodd; Ian A. Griffin; Peter J. Fleming

2009-08-01T23:59:59.000Z

418

Fundamental solutions of homogeneous elliptic differential operators  

E-Print Network (OSTI)

We compute fundamental solutions of homogeneous elliptic differential operators, with constant coefficients, on $\\mathbb{R}^n$ by mean of analytic continuation of distributions. The result obtained is valid in any dimension, for any degree and can be extended to pseudodifferential operators of the same type.

Brice Camus

2005-10-31T23:59:59.000Z

419

Power Plant Practices to Ensure Cable Operability  

Science Conference Proceedings (OSTI)

Installation practices as well as environmental conditions affect the operability of electrical cables in power plants. This report evaluates operability criteria for nuclear power plant cables, good practices for cable installation, and cable maintenance and surveillance. As a reference source for utility practices, this report suggests potential improvements that could benefit the industry.

1992-05-02T23:59:59.000Z

420

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

On a parabolic operator of dissipative systems  

E-Print Network (OSTI)

A parabolic integro differential operator operator L suitable to describe many phenomena in various physical fields,is considered. By means of equivalence between L and the third order equation which describe the evolution inside an exponentially shaped Josephson junction (ESJJ), an asymptotic analysis for (ESJJ) is achieved, evaluating explicitly boundary contributions related to the Dirichlet problem.

Monica De Angelis

2013-07-07T23:59:59.000Z

422

Energy Reduction in California Pipeline Operations  

E-Print Network (OSTI)

Energy Reduction in California Pipeline Operations Industrial/Agriculture/Water End-Use PIER The Issue Fluid pipelines operating in California transport gasoline, fuel oil, jet fuel, crude, other hydrocarbons, and water, all vital to the wellbeing of Californias economy. These pipelines are also

423

ICD Complex Operations and Maintenance Plan  

SciTech Connect

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

424

The BABAR Detector: Upgrades, Operation and Performance  

E-Print Network (OSTI)

The BABAR detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.

The BABAR Collaboration

2013-05-15T23:59:59.000Z

425

Cw rf operation of the FMIT RFQ  

SciTech Connect

The 80-MHz RFQ for the Fusion Materials Irradiation Test Facility prototype accelerator has been rf conditioned for cw operation to the design field level of 17.5 MV/m (1.68 x Kilpatrick limit). Experimental results and operating experience will be discussed.

Fazio, M.V.; Brandeberry, F.E.

1985-01-01T23:59:59.000Z

426

OPERATING MANUAL FOR THE AE-6 REACTOR  

SciTech Connect

An attempt is made to provide a single reference source for material pertinent to the maintenance and operation of the AE-6 Reactor. Descriptions of various components are included, as well as the common operational and maintenance procedures and check lists. Information is given on the subcritical assemblies that may be studied. (W.D.M.)

Moore, E.A. Jr.

1960-06-23T23:59:59.000Z

427

Definition: Operating Reserve - Spinning | Open Energy Information  

Open Energy Info (EERE)

Reserve - Spinning Reserve - Spinning Jump to: navigation, search Dictionary.png Operating Reserve - Spinning The portion of Operating Reserve consisting of: Generation synchronized to the system and fully available to serve load within the Disturbance Recovery Period following the contingency event; or, Load fully removable from the system within the Disturbance Recovery Period following the contingency event.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the

428

Independent Specific Administrative Controls Review, Richland Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Specific Administrative Controls Review, Richland Independent Specific Administrative Controls Review, Richland Operations Office - December 2010 Independent Specific Administrative Controls Review, Richland Operations Office - December 2010 December 2010 Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, participated in the Office of Environmental Management Office of Standards and Quality Assurance, EM-23, review of Specific Administrative Controls (SAC) at the Hanford Site. The EM-23 review included selected programs at the Hanford Site that are under the auspices of the DOE Richland Operations Office. Independent Specific Administrative Controls Review, Richland Operations

429

Nuclear reactor characteristics and operational history  

Gasoline and Diesel Fuel Update (EIA)

1. Capacity and Generation, Table 3. Characteristics and Operational History 1. Capacity and Generation, Table 3. Characteristics and Operational History Table 2. U.S. Nuclear Reactor Ownership Data PDF XLS Plant/Reactor Name Generator ID Utility Name - Operator Owner Name % Owned Arkansas Nuclear One 1 Entergy Arkansas Inc Entergy Arkansas Inc 100 Arkansas Nuclear One 2 Entergy Arkansas Inc Entergy Arkansas Inc 100 Beaver Valley 1 FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Generation Corp 100 Beaver Valley 2 FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Generation Corp 100 Braidwood Generation Station 1 Exelon Nuclear Exelon Nuclear 100 Braidwood Generation Station 2 Exelon Nuclear Exelon Nuclear 100 Browns Ferry 1 Tennessee Valley Authority Tennessee Valley Authority 100

430

Security Operations, Laboratory Protection Division, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

Security Operations Security Operations Homepage Brookhaven ID Badges, Passes, & Vehicle Stickers Hours of Operation Points of Contact Unclassified Foreign Visits and Assignments: FAQs BNL Site Access Main Gate Access Forms Security Operations L. Butera, Manager Brookhaven National Laboratory Bldg. 50 - P.O. Box 5000 Upton, NY 11973-5000 (631) 344-4691 E-mail: lbutera@bnl.gov Security Operations Mission Statement: To protect DOE special nuclear materials, classified matter, sensitive information, and certain sensitive property against theft, diversion, or destruction; to prevent the sabotage of programs that could result in significant scientific or financial impact; to prevent the malevolent release of hazardous materials including radiological, chemical, and infectious agents or other criminal acts that would endanger employees, the public, and the environment.

431

Challenges with jointed-pipe underbalanced operations  

Science Conference Proceedings (OSTI)

Successful underbalanced operations demand a systematic approach with integration of engineering, operations, production, reservoir, and geology. There are significant advantages to underbalanced drilling (UD). Formation damage can be minimized if proper circulating fluids and operating parameters are chosen; there is an opportunity for reservoir evaluation and characterization while drilling; lost circulation and differential sticking can be avoided, combined with improvements in drilling rate of penetration (ROP); and it also provides an alternative method of well control. This paper discusses engineering challenges and considerations for underbalanced operations using multiphase flow as well as advances made during UD with rotary jointed pipe. Excluding air, mist, and foam, underbalanced techniques with multiphase fluids are reviewed. Much of the discussion and concepts also apply to coiled-tubing underbalanced operations.

Saponja, J.

1998-06-01T23:59:59.000Z

432

Definition: Operating Reserve - Supplemental | Open Energy Information  

Open Energy Info (EERE)

Supplemental Supplemental Jump to: navigation, search Dictionary.png Operating Reserve - Supplemental The portion of Operating Reserve consisting of: Generation (synchronized or capable of being synchronized to the system) that is fully available to serve load within the Disturbance Recovery Period following the contingency event; or, Load fully removable from the system within the Disturbance Recovery Period following the contingency event.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the

433

Occurrence reporting and processing of operations information  

Science Conference Proceedings (OSTI)

DOE O 232.1A, Occurrence Reporting and Processing of Operations Information, and 10 CFR 830.350, Occurrence Reporting and Processing of Operations Information (when it becomes effective), along with this manual, set forth occurrence reporting requirements for Department of Energy (DOE) Departmental Elements and contractors responsible for the management and operation of DOE-owned and -leased facilities. These requirements include categorization of occurrences related to safety, security, environment, health, or operations (``Reportable Occurrences``); DOE notification of these occurrences; and the development and submission of documented follow-up reports. This Manual provides detailed information for categorizing and reporting occurrences at DOE facilities. Information gathered by the Occurrence Reporting and processing System is used for analysis of the Department`s performance in environmental protection, safeguards and security, and safety and health of its workers and the public. This information is also used to develop lessons learned and document events that significantly impact DOE operations.

NONE

1997-07-21T23:59:59.000Z

434

PP-369 British Columbia Transmission Corporation and British Columbia Hydro  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-369 British Columbia Transmission Corporation and British PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate,a dn maintain electric transmission facilities at the U.S. - Canada Border. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4 British

435

MHK Technologies/HydroGen 10 | Open Energy Information  

Open Energy Info (EERE)

HydroGen 10 HydroGen 10 < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage HydroGen 10.jpg Technology Profile Primary Organization HydroGen Aquaphile sarl Project(s) where this technology is utilized *MHK Projects/Hydro Gen Technology Resource Click here Current/Tidal Technology Type Click here Oscillating Wave Surge Converter Technology Readiness Level Click here TRL 7/8: Open Water System Testing & Demonstration & Operation Technology Description Hydro Gen is a big floating paddle wheels turbine included in a catamaran frame venturi shaped The frame is optimized to allow tapping a maximum of water in move in order to capture a maximum of kinetic energy which is transformed in mechanical energy by the wheel motion and then transformed into electrical energy through a generator mechanically driven by the wheel And then finally changed by a power control station to a steady electrical current normed at the customer request

436

Electric circuit breaker comprising a plurality of vacuum interrupters simultaneously operated by a common operator  

DOE Patents (OSTI)

This circuit breaker comprises a plurality of a vacuum-type circuit interrupters, each having a movable contact rod. A common operating device for the interrupters comprises a linearly-movable operating member. The interrupters are mounted at one side of the operating member with their movable contact rods extending in a direction generally toward the operating member. Means is provided for mechanically coupling the operating member to the contact rods, and this means comprises a plurality of insulating operating rods, each connected at one end to the operating member and at its opposite end to one of the movable contact rods. The operating rods are of substantially equal length and have longitudinal axes that converge and intersect at substantially a common point.

Barkan, Philip (Stanford, CA); Imam, Imdad (Secane, PA)

1980-01-01T23:59:59.000Z

437

A simulation approach to the evaluation of operational costs and performance in liner shipping operations  

Science Conference Proceedings (OSTI)

This paper presents a simulation model of the operation of a liner shipping network that considers multiple service routes and schedules. The objective is to evaluate the operational costs and performance associated with liner shipping, as well as the ...

Aldo A. McLean; William E. Biles

2008-12-01T23:59:59.000Z

438

Operating Experience and Teardown Analysis for Engines Operated on Biodiesel Blends (B20)  

DOE Green Energy (OSTI)

In this study, eight engines and fuel systems were removed from trucks operating on B20 or diesel. Results indicate little difference in operational and maintenance costs between the B20- and diesel.

Fraer, R.; Dinh, H.; Proc, K.; McCormick, R. L.; Chandler, K.; Buchholz, B.

2005-11-01T23:59:59.000Z

439

Low voltage operation of plasma focus  

SciTech Connect

Plasma foci of compact sizes and operating with low energies (from tens of joules to few hundred joules) have found application in recent years and have attracted plasma-physics scientists and engineers for research in this direction. We are presenting a low energy and miniature plasma focus which operates from a capacitor bank of 8.4 {mu}F capacity, charged at 4.2-4.3 kV and delivering approximately 52 kA peak current at approximately 60 nH calculated circuit inductance. The total circuit inductance includes the plasma focus inductance. The reported plasma focus operates at the lowest voltage among all reported plasma foci so far. Moreover the cost of capacitor bank used for plasma focus is nearly 20 U.S. dollars making it very cheap. At low voltage operation of plasma focus, the initial breakdown mechanism becomes important for operation of plasma focus. The quartz glass tube is used as insulator and breakdown initiation is done on its surface. The total energy of the plasma focus is approximately 75 J. The plasma focus system is made compact and the switching of capacitor bank energy is done by manual operating switch. The focus is operated with hydrogen and deuterium filled at 1-2 mbar.

Shukla, Rohit; Sharma, S. K.; Banerjee, P.; Das, R.; Deb, P.; Prabahar, T.; Das, B. K.; Adhikary, B.; Shyam, A. [Energetics and Electromagnetics Division, Facility for Electromagnetic Systems, Bhabha Atomic Research Center, Visakhapatanam, A.P. 530012 (India)

2010-08-15T23:59:59.000Z

440

Effective Energy Management Through Better Operator Training  

E-Print Network (OSTI)

A majority of the energy conservation programs in the chemical process industry aims at gaining cooperation and motivation from the operators or technicians. These programs are useful but they seem to lack an important aspect: "Operator training in the energy conservation techniques." The purpose of this presentation is to outline general guidelines for this training. Out of the many energy-intensive operations, two are presented as an example - viz. distillation and furnaces. This type of training should be an integral part of an overall energy management program in a plant. Efficient operation of the process equipment is a key to energy conservation. In a process plant, majority of energy consumption is taken up by operation of the plant. Although we all are involved in conservation efforts, it is the operators, who directly affect the energy savings. It is therefore reasonably obvious that these individuals should be adequately trained in "the techniques of energy conservation". By making operator training an integral part of a conservation program, the effectiveness (and efficiency too) of the program can be considerably improved.

Shah, G. C.

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

PIA - WEB Unclassified Business Operations General Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support...

442

Hanford People Core (HCP) PIA, Richland Operations Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office...

443

Implementing Residue Chippers On Harvesting Operation for Biomass Recovery.  

E-Print Network (OSTI)

??Three operations that implemented a small residue chipper on their conventional logging operations were studied in 2006. Two of the jobs were thinning operations, the… (more)

Aulakh, Jaspreet

2008-01-01T23:59:59.000Z

444

Oak Ridge Operations Office of Environmental Management Overview...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental...

445

Applications of Cermets to Meet Operational Waste Package Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Operational Waste Package Requirements Applications of Cermets to Meet Operational Waste Package Requirements The cermet could meet three operational requirements for the waste...

446

2013 Annual Planning Summary for the Idaho Operations Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Annual Planning Summary for the Idaho Operations Office 2013 Annual Planning Summary for the Idaho Operations Office 2013 Annual Planning Summary for the Idaho Operations Office...

447

ICR-ICE Standard Operating Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICR-ICE Standard Operating Procedures ICR-ICE Standard Operating Procedures ICE-ICR SOP.pdf More Documents & Publications External Independent Review (EIR) Standard Operating...

448

Lockout-Tagout Standard Operating Procedures, Policy 2010-002...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lockout-Tagout Standard Operating Procedures, Policy 2010-002 Lockout-Tagout Standard Operating Procedures, Policy 2010-002 Lockout-Tagout Standard Operating Procedures for...

449

Hanford People Core (HCP) PIA, Richland Operations Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People...

450

Hanford Waste Tank Plant PIA, Richland Operations Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Waste Tank Plant PIA, Richland Operations Office Hanford Waste Tank Plant PIA, Richland Operations Office Hanford Waste Tank Plant PIA, Richland Operations Office Hanford...

451

Investigation of Catalyst Deactivation from Operation Below the Minimum Operating Temperature  

Science Conference Proceedings (OSTI)

The expanding use of alternative and renewable energy sources is forcing large coal-fired power plants to operate at low load more frequently and for longer periods. For units with selective catalytic reduction (SCR) systems and without economizer bypass capabilities, low-load operation requires the SCR system to operate at reduced flue gas temperatures. For units burning high-sulfur coal, these lower temperatures are often below the minimum operating temperature defined by SCR catalyst vendors. ...

2012-09-11T23:59:59.000Z

452

Raising and lowering operators, factorization and differential/difference operators of hypergeometric type  

E-Print Network (OSTI)

Starting from Rodrigues formula we present a general construction of raising and lowering operators for orthogonal polynomials of continuous and discrete variable on uniform lattice. In order to have these operators mutually adjoint we introduce orthonormal functions with respect to the scalar product of unit weight. Using the Infeld-Hull factorization method, we generate from the raising and lowering operators the second order self-adjoint differential/difference operator of hypergeometric type.

M. Lorente

2004-01-14T23:59:59.000Z

453

Headquarters Personnel Security Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Personnel Security Operations Headquarters Personnel Security Operations Headquarters Personnel Security Operations Mission and Functions Mission Provide a comprehensive Personnel Security Program for the DOE Headquarters complex. Ensure that DOE classified information, materials, buildings and information systems are safeguarded from compromise by only granting security clearances and building access to trustworthy individuals. This is accomplished through conscientious, just, and thoughtful application of Federal rules and statutes with the goal of ensuring that only individuals whose character, associations, and loyalty do not endanger the common defense are granted access to DOE classified information, materials, buildings and information systems. Functions The primary function of the Office of Headquarters Personnel

454

Operational Demonstration Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Demonstration Program Operational Demonstration Program Operational Demonstration Program < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Buying & Making Electricity Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Water Heating Wind Maximum Rebate $500,000 Program Info Funding Source CEFIA Start Date 2005 State Connecticut Program Type Industry Recruitment/Support Rebate Amount $150,000 - $500,000 Provider Clean Energy Finance and Investment Authority This program is currently closed. Applications were due in February 2012.

455

Transmission eigenvalues for operators with constant coefficients  

E-Print Network (OSTI)

In this paper we study the interior transmission problem and transmission eigenvalues for multiplicative perturbations of linear partial differential operator of order $\\ge 2$ with constant real coefficients. Under suitable growth conditions on the symbol of the operator and the perturbation, we show the discreteness of the set of transmission eigenvalues and derive sufficient conditions on the existence of transmission eigenvalues. We apply these techniques to the case of the biharmonic operator and the Dirac system. In the hypoelliptic case we present a connection to scattering theory.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-04-28T23:59:59.000Z

456

ATLAS Maintenance and Operation management system  

E-Print Network (OSTI)

The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

Copy, B

2007-01-01T23:59:59.000Z

457

Operation of staged membrane oxidation reactor systems  

DOE Patents (OSTI)

A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

Repasky, John Michael

2012-10-16T23:59:59.000Z

458

Amendment No.: 185. Renewed Facility Operating License  

E-Print Network (OSTI)

Brief description of amendment: The amendments revise the facility operating license to delete Section 2.G.1 of the Facility Operating License, which requires reporting of violations of the requirements in Section 2, items C(1), C(3) though (33), E, F, K, and L of the Facility Operating License. The proposed amendment would also delete Section 6.6 of the Technical Specifications (TSs) regarding reportable events. Section 6.6 of the TSs are redundant to requirements that have since been embodied in the regulations and, accordingly, may be deleted from the TS.

Virgil C. Summer Nuclear Station

2011-01-01T23:59:59.000Z

459

Dynamic model of power system operation incorporating load control  

SciTech Connect

Load management has been proposed as a means whereby an electric utility can reduce its requirements for additional generation, transmission, and distribution investments, shift fuel dependency from limited to more abundant energy resources, and improve the efficiency of the electric energy system. There exist, however, serious technological and economic questions which must be answered to define the cost trade-offs between initiating a load management strategy or adding additional capacity to meet the load. One aspect of this complex problem is to determine how the load profile might be modified by the load management option being considered. Towards this end, a model has been developed to determine how a power system with an active load control system should be operated to make the best use of its available resources. The model is capable of handling all types of conventional generating sources including thermal, hydro, and pumped storage units, and most appliances being considered for direct control including those with inherent or designed storage characteristics. The model uses a dynamic programming technique to determine the optimal operating strategy for a given set of conditions. The use of the model is demonstrated. Case study results indicate that the production cost savings that can be achieved through the use of direct load control are highly dependent on utility characteristics, load characteristics, storage capacity, and penetration. The load characteristics that produce the greatest savings are: large storage capacity; high coincidence with the system peak; large connected load per point; and moderately high diversity fraction.

Kuliasha, M.A.

1980-10-01T23:59:59.000Z

460

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 CX-008639: Categorical Exclusion Determination Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008638: Categorical Exclusion Determination Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008637: Categorical Exclusion Determination Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008636: Categorical Exclusion Determination Analysis of Organic Species by Gas Chromatography (GC) and Gas

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2013 May 21, 2013 CX-010489: Categorical Exclusion Determination Salt Batch 7 Qualification CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010497: Categorical Exclusion Determination Electrical Operations to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010496: Categorical Exclusion Determination Corrosion Tests on Carbon Steel Exposed to Oxalic Acid and a Sludge Simulant CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010495: Categorical Exclusion Determination Advanced Fuel Cycle Initiative (AFCI) Am/Cm Separations

462

Constellation Operating Services | Open Energy Information  

Open Energy Info (EERE)

Operating Services Operating Services Jump to: navigation, search Name Constellation Operating Services Place Fallon, Nevada Zip 89406 Sector Geothermal energy Product Operator of the Soda Lake geothermal plants. Coordinates 39.474905°, -118.777624° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.474905,"lon":-118.777624,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

463

Definition: Rated Electrical Operating Conditions | Open Energy...  

Open Energy Info (EERE)

operate.1 Related Terms system References Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline...

464

REAL TIME SYSTEM OPERATIONS 2006-2007  

E-Print Network (OSTI)

WECC’s revised voltage? VAR requirements (Martinez, et.al.  operator-directed voltage-VAR requirements as reliably asto adopt stricter voltage-VAR requirements. The California

Eto, Joseph H.

2008-01-01T23:59:59.000Z

465

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2011 June 20, 2011 CX-006372: Categorical Exclusion Determination Well Installations at R-Area Operable Unit CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2011 CX-006373: Categorical Exclusion Determination Connect 735-11A to the Central Plant Chilled Water System CX(s) Applied: B1.3 Date: 06/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006375: Categorical Exclusion Determination Replace Transfer Lines with Spare Lines CX(s) Applied: B1.3 Date: 06/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006374: Categorical Exclusion Determination

466

US Operating Services Company | Open Energy Information  

Open Energy Info (EERE)

Operating Services Company Operating Services Company Jump to: navigation, search Name US Operating Services Company Place New Jersey Utility Id 14932 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Industrial: $0.0708/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File2_2010" Retrieved from "http://en.openei.org/w/index.php?title=US_Operating_Services_Company&oldid=412872" Categories: EIA Utility Companies and Aliases Utility Companies Organizations Stubs What links here Related changes Special pages Printable version

467

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

468

AVESTAR® - Operational Excellence for Clean Energy Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Operational Excellence for Clean Energy Systems Operational Excellence for Clean Energy Systems Chart The world-class Advanced Virtual Energy Simulation Training and Research (AVESTAR®) Center at the U.S. Department of Energy's National Energy Technology Laboratory (NETL) is dedicated to accelerating progress toward achieving operational excellence for commercial-scale, clean energy systems from smart plants to smart grid. With two locations in Morgantown, WV, one at the NETL and the other at West Virginia University's National Research Center for Coal and Energy, the AVESTAR Center is accomplishing its vital mission by bringing together: Advanced dynamic simulation, control, and virtual plant technologies Real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTS)

469

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 15, 2013 March 15, 2013 CX-010126: Categorical Exclusion Determination Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010125: Categorical Exclusion Determination Microfluidics for Advanced Separation and Ultrasensitive Detection CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010131: Categorical Exclusion Determination Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010130: Categorical Exclusion Determination Mechanical Isolation of Plant Air System at TNX

470

Nuclear reactor characteristics and operational history  

Gasoline and Diesel Fuel Update (EIA)

Nuclear > U.S. reactor operation status tables Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: November 2012 See also: Table 1. Capacity and Generation, Table 2. Ownership Data Table 3. Nuclear Reactor Characteristics and Operational History PDF XLS Plant Name Generator ID Type Reactor Supplier and Model Construction Start Grid Connection Original Expiration Date License Renewal Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1 PWR Babcock&Wilcox, Lower Loop 10/1/1968 8/17/1974 5/20/2014 2/1/2000 6/20/2001 5/20/2034 Arkansas Nuclear One 2 PWR Combustion Eng. 7/1/1971 12/26/1978 7/17/2018 10/15/2003 6/30/2005 7/17/2038

471

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 25, 2011 January 25, 2011 CX-005187: Categorical Exclusion Determination Hex Block Shipment Project CX(s) Applied: B3.6 Date: 01/25/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office January 5, 2011 CX-004926: Categorical Exclusion Determination Radioactive Waste Management Complex ? Analytical Laboratory Operations CX(s) Applied: B3.1 Date: 01/05/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office December 10, 2010 CX-004645: Categorical Exclusion Determination CPP-663 Heating, Ventilation and Air Conditioning Systems Upgrade CX(s) Applied: B2.1 Date: 12/10/2010 Location(s): Idaho Office(s): Idaho Operations Office November 16, 2010 CX-004561: Categorical Exclusion Determination Idaho Nuclear Technology and Engineering Center - Light Water Breeder

472

Nuclear Facility Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Operations Facility Operations Nuclear Facility Operations INL is a science-based, applied engineering national laboratory dedicated to meeting the nation's environmental, energy, nuclear technology, and national security needs. INL is a science-based, applied engineering national laboratory dedicated to meeting the nation's environmental, energy, nuclear technology, and national security needs. The Idaho Operations Office oversees these contract activities in accordance with DOE directives. INL is a multi-program laboratory In addition to enabling the Office of Nuclear Energy to develop space power systems and advanced fuel cycle and reactor technologies, INL facilities are used by the National Nuclear Security Administration and other DOE offices, together with other Federal agencies such as the Department of

473

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 11, 2009 August 11, 2009 CX-000513: Categorical Exclusion Determination Cone Penetration Test sampling at ECODS (Early Construction and Operational Disposal Sites) B3 and B5 CX(s) Applied: B3.1 Date: 08/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000511: Categorical Exclusion Determination Isolation of Domestic Water Line, 782-4G CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000512: Categorical Exclusion Determination Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 Outfall Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

474

Operational support systems — the global dimension  

Science Conference Proceedings (OSTI)

Global activity in the telecommunications industry is increasing as operators look to expand into overseas markets, a trend that is currently being accelerated by the rationalisation of the information technology (IT), telecommunications and entertainment ...

H. Sundaresan

1997-01-01T23:59:59.000Z

475

Generalized Stability Theory. Part II: Nonautonomous Operators  

Science Conference Proceedings (OSTI)

An extension of classical stability theory to address the stability of perturbations to time-dependent systems is described. Nonnormality is found to play a central role in determining the stability of systems governed by nonautonomous operators ...

Brian F. Farrell; Petros J. Ioannou

1996-07-01T23:59:59.000Z

476

meeting summary– First Northeast Regional Operational Workshop  

Science Conference Proceedings (OSTI)

The First Northeast Regional Operational Workshop, focusing on hydrometeorology in the northeastern United States, was held 21—23 September 1999 in Albany, New York. Sessions in local and mesoscale modeling, lake—effect snow, hydrology, heavy ...

Eugene P. Auciello

2000-06-01T23:59:59.000Z

477

Integrated Designs to Integrated Operations using BMS  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Designs to Integrated Operations using BMS Speaker(s): Punit Desai Date: February 6, 2013 - 12:15pm Location: 90-3122 Seminar HostPoint of Contact: Girish Ghatikar The...

478

Reactor Operations informal monthly report September 1994  

SciTech Connect

This paper presents operations at the MRR and HFBR reactors at Brookhaven National Laboratory for September 1994. Reactor run-times, instrumentation, mechanical maintenance, occurrence reports and safety information are listed. Irradiation summaries are included.

Junker, L.

1994-09-01T23:59:59.000Z

479

Reactor Operations informal monthly report December 1994  

Science Conference Proceedings (OSTI)

Reactor operations at the MRR and HFBR reactors at Brookhaven National Laboratory are presented for December 1994. Reactor run-time and power levels, instrumentation, mechanical maintenance, occurrence reports, and safety information are included.

NONE

1994-12-01T23:59:59.000Z

480

Naturalistic Decision Making for Power System Operators  

Science Conference Proceedings (OSTI)

Motivation – Investigations of large-scale outages in the North American interconnected electric system often attribute the causes to three T’s: Trees, Training and Tools. To document and understand the mental processes used by expert operators when making critical decisions, a naturalistic decision making (NDM) model was developed. Transcripts of conversations were analyzed to reveal and assess NDM-based performance criteria. Findings/Design – An item analysis indicated that the operators’ Situation Awareness Levels, mental models, and mental simulations can be mapped at different points in the training scenario. This may identify improved training methods or analytical/ visualization tools. Originality/Value – This study applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message – The NDM approach provides a viable framework for systematic training management to accelerate learning in simulator-based training scenarios for power system operators and teams.

Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

2010-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating operating hydro" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Contractor Fee Payments- Idaho Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts.

482

The processes of airline operational control  

E-Print Network (OSTI)

The airline industry has undergone many drastic changes in the way operations are conducted since the Airline Deregulation Act of 1978. The Federal Aviation Administration of the Department of Transportation, however, has ...

Grandeau, Seth C.

1995-01-01T23:59:59.000Z

483

Two Years of Operational Hurricane Synoptic Surveillance  

Science Conference Proceedings (OSTI)

In 1997, the National Hurricane Center and the Hurricane Research Division began operational synoptic surveillance missions with the Gulfstream IV-SP jet aircraft to improve the numerical guidance for hurricanes that threaten the continental ...

Sim D. Aberson

2002-10-01T23:59:59.000Z

484

National Security Technology Incubator Operations Plan  

Science Conference Proceedings (OSTI)

This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

None

2008-04-30T23:59:59.000Z

485

Disruption Management | Operations Research between planning ...  

E-Print Network (OSTI)

in the airline industry, production management and logistics. At the department .... the status of the system forming the basis for operation is monitored. 4 .... In addition hereto airlines regularly face restrictive weather conditions, maintenance .

486

Radiative Measurements of Pressure Modulator Operation  

Science Conference Proceedings (OSTI)

The pressure modulator is extensively used in atmospheric measurements but is not well characterized in terms of its spectroscopic operation. A series of measurements on a carbon monoxide radiometer is described and comparisons are made with ...

J. R. Drummond; A. Ashton

1990-02-01T23:59:59.000Z

487

Definition: Interconnection Reliability Operating Limit | Open...  

Open Energy Info (EERE)

Terms System Operating Limit, System, Cascading Outage, smart grid References Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign...

488

Arena in the petrochemical operations environment  

Science Conference Proceedings (OSTI)

The use of discrete event simulation within Sasol, an international petrochemical company, is fast becoming an important tool for supporting strategic decision-making in the continuous operations environment. Arena models are used specifically to investigate ...

Lorraine Malherbe

2007-12-01T23:59:59.000Z

489

The Operational Weather Radar Network in Europe  

Science Conference Proceedings (OSTI)

The operational weather radar network in Europe covers more than 30 countries and contains more than 200 weather radars. The radar network is heterogeneous in hardware, signal processing, transmit/receive frequency, and scanning strategy, thus making it ...

Asko Huuskonen; Elena Saltikoff; Iwan Holleman

490

Sexual selection of co-operation  

Science Conference Proceedings (OSTI)

Advocates of sexual selection theory have argued that various male traits, such as male co-operative behavior towards females, can evolve through female preference for mating with those males who possess that trait. This paper reports on the results ...

M. Afzal Upal

2003-07-01T23:59:59.000Z

491

Categorical Exclusion Determinations: Savannah River Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 CX-005103: Categorical Exclusion Determination Operation of Zeiss Sigma VP Scanning Electron Microscope (SEM) CX(s) Applied: B3.6 Date: 01122011 Location(s): Aiken, South...

492

Asbestos : operating system security for mobile devices  

E-Print Network (OSTI)

This thesis presents the design and implementation of a port of the Asbestos operating system to the ARM processor. The port to the ARM allows Asbestos to run on mobile devices such as cell phones and personal digital ...

Stevenson, Martijn

2006-01-01T23:59:59.000Z

493

Modular Lattice for $C_{o}$-Operators.  

E-Print Network (OSTI)

We study modularity of the lattice Lat $(T)$ of closed invariant subspaces for a $C_0$-operator $T$ and find a condition such that Lat $(T)$ is a modular. Furthermore, we provide a quasiaffinity preserving modularity.

Yun-Su Kim

494

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Current Beam Status 101713 11:43 Beam is back on target at 485 kW. Power increases will occur throughout the day. Status, Schedules & Alerts Energy and...

495

Operational Forecaster Uncertainty Needs and Future Roles  

Science Conference Proceedings (OSTI)

Key results of a comprehensive survey of U.S. National Weather Service operational forecast managers concerning the assessment and communication of forecast uncertainty are presented and discussed. The survey results revealed that forecasters are ...

David R. Novak; David R. Bright; Michael J. Brennan

2008-12-01T23:59:59.000Z

496

Westinghouse TRU Solutions LLC Assumes WIPP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Manager of WTS. A retired U.S. Navy Rear Admiral, Herrera has more than 27 years of nuclear operations and radioactive waste management experience. He spent 24 years in nuclear...

497

Contractor Fee Payments- Oak Ridge Operations  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts.  

498

Operating Experience Summary 2003-17  

NLE Websites -- All DOE Office Websites (Extended Search)

OPERATING EXPERIENCE SUMMARY U.S. Department of Energy Office of Environment, Safety and Health OE Summary 2003-17 August 25, 2003 * Underrated and unmaintained hoist used to lift...

499

RHIC low energy tests and initial operations  

SciTech Connect

Future Relativistic Heavy Ion Collider (RHIC) runs, including a portion of FY10 heavy ion operations, will explore collisions at center of mass energies of 5-50 GeV/n (GeV/nucleon). Operations at these energies is motivated by a search for the QCD phase transition critical point. The lowest end of this energy range is nearly a factor of four below the nominal RHIC injection center of mass energy of {radical} s = 20.8 GeV/n. There are several operational challenges in the RHIC low-energy regime, including harmonic number changes, small longitudinal acceptance, lowered magnet field quality, nonlinear orbit control, and luminosity monitoring. We report on the experience with some of these challenges during beam tests with gold in March 2008, including first RHIC operations at {radical}s = 9.18 GeV/n and first beam experience at {radical}s = 5 GeV/n.

Satogata,T.; Ahrens, L.; Bai, M.; Brennan, J.M.; Bruno, D.; Butler, J.; Drees, A.; Fedotov, A.; Fischer, W.; Harvey, M.; Hayes, T.; Jappe, W.; Lee, R.C.; Mackay, W.W.; Malitsky, N.; Marr, G.; Michnoff, R.; Oerter, B.; Pozdeyev, E.; Roser, T.; Severino, F.; Smith, K.; Tepikian, S.; Tsoupas, N.

2009-05-04T23:59:59.000Z

500

Optimal operating strategy for a storage facility  

E-Print Network (OSTI)

In the thesis, I derive the optimal operating strategy to maximize the value of a storage facility by exploiting the properties in the underlying natural gas spot price. To achieve the objective, I investigate the optimal ...

Zhai, Ning

2008-01-01T23:59:59.000Z